Internship portfolio at DP Architects

Page 1

Some of their works are Esplanade Theatres on the Bay, The Dubai Mall and Resorts World Sentosa, Singapore Sports Hub, Our Tampines Hub and Singapore Chinese Cultural Centre.

I was trained in India, Bangalore Esplanade Theatres on the Bay Esplanade-Theatres on the Bay The Dubai mall Singapore cultural center Singapore sports complex

DP Architects is founded in 1967 the very first firm in Singapore Its been 50 years and it’s a global firm which is operating in 17 countries like UK, UAE, India, Iran, CurrentlyIndonesia….it’sthe10th largest Architectural firm in the world

The firm was founded on a deep concern for the built environment and the need to create architecture of excellence that enriches the human experience and spirit.

Trainee details : Uppu Vinay Gandhi TrainingSPA,BArch1160100622IVyearVijayawada.details: Office : DPA Consultants pvt ltd, Bangalore Training period : 5 months Type of work handled : Worked in design development, Conceptual designs, some details and presentations. Type of Projects : Large scale Commercial office spaces. _Projects 1. RMZ Nexity, Hyderabad. (full time project) 2. My Home IT Park, Hyderabad. (conceptual project) 3.Ecoworld 20 & 21, Bangalore. (full time project) 4.One paramount, Chennai. (part time project) RMZ Nexity My home IT parkRMZ one paramount

The Nexity site is located at Hi Tech city in Hyderabad The building is surrounded by Tech companies namely Novartis, TCS, Delloite, IBM, etc The site benefits from its distinguished location as it offers good connectivity via bus and railway station It is easily accessible and well connected. Some key distances are: • Airport : 35 km • Begumpet Railway Station : 11 km • Cyber Tower Bus terminus : 3 km Central Business District : 12 km

• Knowledge square overlooked by the office towers and Annex acts as a communal space for activities and interaction.

• Urban Terrace is pedestrian friendly zone integrating biophilic public spaces and progressive intelligent pocket.

• All towers are situated on a raised lushly landscaped plaza.

THE IMAGE

DESIGN APPROACH THE PROGRAMME AND MASSING

• Site can be approached from 3 main roads

• Commercial retail and F&B services planned around a landscaped central garden court with a knowledge arena for outdoor performances at ground level.

THE PLANNING

• Exclusive Annex tower consists of F&B, The Street, coworks & recreational activities as part of Active.

RMZ Nexity, Hyderabad. (full time project)

The Urban Design and Architecture of the building aims to realize RMZ Corp’s philosophy to develop Business parks that are environmentally sustainable and responsive to global concerns and yet address the essential need of the business community Thereby aiming towards being a truly sustainable development by incorporating aspects of environmental, economic and social sustainability.

THE URBAN DESIGN AND ARCHITECTURE

The Grid

• Festive square creates a welcoming experience for the public to make use of the F & B and retail planned at the Annex and Urban Terrace.

Double height entrance lobby South viewSite plan

The approach to planning of office spaces aim to provide flexibility, functionality and technology that are responsive to the needs and demands of businesses. This is achieved by organizing the office space within a 11.20 M x 11.20 M structural grid that allows flexibility for all types of internal office planning while maximising the car park efficiency in the basements. Central cores provide the vertical connection between office floors as well accommodating the necessary services Centralised planning facilities efficiency in spatial planning as well as energy efficiency By maximising the building envelope available for natural lighting and views we created better work environments

The office buildings are all 22 storied high, within the height limit of 110M stipulated by the airports Authority of India.

Extensive green spaces and lush gardens with water features, sculpture courts, outdoor resting areas and plazas are urban spaces that give a sense of place that people can identify with

• Car parking facilities planned at 5 basement levels.

THE URBAN AMENITIES in the development help to make Nexity an executive hub that emphasizes interpersonal communication and offers the possibility of a better lifestyle, supporting the building of a business community rather than mere physical accommodation for businesses.

My home IT park, Hyderabad. (conceptual project) Central plaza Birds view

• The main corridor which runs throughout the length of the office should not be <1.5m • The gap between two workstations should be 900mm • Enough buffer should be given at the fire exits • Occupancy @ I person/sq.m of carpet area • These plans are done to know whether we are reaching the required occupancy number. Spaces required for the fit out design • Reception - at the entrance lobby • Waiting lounge • A Board room for discussions among the higher officials. • Meeting rooms - with different capacities as per requirement • Cabins - for the director and MDs • A server room - not less than 30 sq.m • Additional spaces like pantry, dining can be included as per the requirements of client

• In multi office floors all the required spaces and rooms should be given separately with respect to the number of offices.

CB

Out air fan shaft (OA) Communication shaft (COMM) Fire alarm and public announcement shaft (FAPA)

• Floor is lit uniformly with the natural lighting Components of a core_

• The floor services like toilets, AHUs and electrical rooms along with the service shafts Lifts For buildings higher than 15 meters, there is a need for a lift a maximum of eight passenger lift bank can be used (with automatic doors and speed sufficient to reach the top floor in 60 seconds), and other requirements as per the Fire Prevention Act and rules of each State As per the NBC 2016, there is a need for a stretcher lift in buildings having a height of more than 30 meters Grouping of lifts in high rise building The max number of lifts in a bank can be 8 The used grouping here is 8 bank lift Thumb rule if the area of the floor is above 3000 sq.m requires a 8 bank lift staircases For high raised structures the min staircase width is 1 5m Stair cases should be placed within a minimum travel distance of 30m and should be pressurized (NBC 2016) 1 unit width of staircase can evacuate 100 people Staircases are designed according to this calculations occupancy / 100 = total width of all staircases The present plan has 4 staircases s1, s2, s3, s4 of widths 1.5m,2m,2m.1.5m Maximum occupancy of any floor in this tower is 530+ Requires width = 630/100 = 6.3 or 7 Given width = s1+s2+s3+s4 = 1.5+2+2+1.5 = 7m

Ante space spaceAnte

PCT physically challenged toilet min dimensions 2.4 X1.8m Service balconies

• Its a composition of vertical climbing elements_ the lifts and staircases, lobbies,

Typical floor toilets are planned and designed as per NBC norms For male 1 EWC + 1 Basin for 25 people and 4 urinals for 75 100 people For females 1 EWC for 15 and 1 Basin for 25 people

Service shafts

• Centralized is the one with core placed at the center of the tower

• The core • The extended floor around the core Core • Generally preferred cores_ centralized and lateral

Typical floor plan

Service balconies_ 1 per office AHUs

• The edges of the floor will be obstruction free, so there will be a chance of view to each and everyone in the floor

• As the edges are free so there wont be any disturbance for making a clear facade

PHE shafts for toilet plumbing

These shafts run from basement to the terrace pressurization shafts (PRZ) for lifts and staircases

AHU shafts are included in the room itself

PCT Male Femaletoilettoilet

Vanity counter Vanity counter

• While in lateral the core is placed along one edge of the tower Centralized Core

Toilets Toilets fixtures are maintained as 60:40% for men and women respectively. A mandatory specially abled toilet should be given

Minimum area for the AHU room 25sq m Per office its better to have 2 AHUs Electrical room Minimum area for the electrical room 15sq m 1 room per office

Electrical shafts (ELE) Fire hose controller shafts (FHC) at each staircase

One service balcony should be give to each office for the maintenance and to place additional air conditioning equipment minimum dimensions of 5X2.5m and it should be places at the periphery of the building

Floor plate is a composition of two things_

• Core is at equidistant from each and every corner of the floor

Typical low

floor plan - 5,9 Refuge >350 sq.m

The tower is G + 4B + 29F So it requires a 3 banks of lifts roughly dividing 1 per 10 floors

Floors which can be accessed by Low rise lift Floors which can be accessed by mid rise lift Floors which can be accessed by high rise lift

• The mid rise lifts mainly travel between 12 to 22, but starts from ground floor and opens at even floor levels one main reason is for the emergency landing at the immediate level

Refuge area As per NBC regulations, Refuge terraces planned at/ above 24m and thereafter at every 15m along the periphery of the floor and are connected to the fire tower. Refuge terraces can accommodate occupants of 2 consecutive floors @ 0.3 sqm per person. An additional wheel chair area of 0.9 sqm. for every 200 occupants.

Transition b/w low rise and midLiftrisemachine room for low rise Transition b/w mid rise and highLiftrisemachine room for mid rise

• The high rise lifts mainly travel between 22 to terrace, but starts from the ground floor and opens at even floor levels, this also helps in the reduction of waiting time.

Ground floor plan First floor plan rise floor riserise

plan - 2,4,6,8,10 Typical low

• The low rise lifts only operate from B4 to 12

floor plan 1,3,11Typical low

Typical mid rise refuge floor plan -19 Transition floor b/w mid & high rise - 22 Mid rise LMR & refuge floor plan - 23 Typical high rise floor plan 24,25,27,28,29 Typical high rise refuge floor plan 26

Transition floor plan refuge floor - 12 Typical mid rise floor plan & Low rise LMR 13 Typical mid rise floor plan - 14,18,20 Typical mid rise refuge floor plan -16 Typical mid rise floor plan -15,17,21

Importing the tower core and column grids to the basements along with the ramps and other things like sunken areas.

Understanding the movement in the ground floor

Finding the looping ramps and arranging the parking layouts

• Each compartment should be around 3000 sq.m • Each compartment should have a staircase within its region • These compartmentation is done to plan the required basement exhaust and fresh air fans • 1 pair of exhaust and fresh air fan can ventilate one compartment of 3000 sq.m All these fans should be open in the podium or at the desired location for fresh air in and foul air out 5

2

Offsetting the site boundary by min of 5m and find a practical profile for the basement boundary.

3

• Car dimensions used is 5X2.5m • For this car dimensions the min driveway should be 5m width • 4 Looping ramps are required as per parking consultants

• So each looping ramp is decided at each tower

1

Identification of additional staircases which run till podium, drawings 30m radius circles from the tower staircases will tell us the areas which are not under the min travel distance, so here the 5 red zones need 5 additional staircases.

Dividing the whole basement into compartments:

4

• Out of which two are double lane ramps and two are single lane Fine tuning the parking by adding additional services like DG room , water sump & pump, toilets, STPs, sub soil wells, MEPs, etc

Typical Section of basement

This sections shows that the clear heights of basements required for the stack parking.

The ceiling slab is done as waffle slab which increases the strength and adds aesthetics to the slab

The final drawing for concept presentation with added vastu constraint services like water sump and diesel generator room This concept is having 1133 cars after adding other required services like toilets, STPs, MEPs, the final car count could be around 1000.

This is the part section done for the project Nexity

The parking type used here is same as in the current project and known as stack parking

A clear floor height of 4650 mm is good enough for different combinations of car types in India.

Conceptual basement plan

Reception & lobby Lift lobbies Toilets

Tower 10 NEXITY Tower 20 NEXITY Tower 30 NEXITY Tower 40 NEXITY Tower 10 SKYVIEW Tower 20 SKYVIEW

RMZ ECO WORLD – Site visit • Massing is done in a way to get a active court yard • It has a sunken OAT and an art gallery • The entire court is taken to the level 1 to have a landscaped podium and the ground floor is full of amenities like shopping ,food and beverages. • The towers are finished in glass and stone cladding (Rajamundry stone) with mass voids • The towers are of 10m high • Fire truck can access the podium by the ramps • It has 3 basements, entire site has basement • The refuge areas are looking into the courtyard • The terrace is used for amenities area for the employee with playareas, swimming pools, gym etc. Entrance, lobby and oat Ground and sky amenities

Thank

Service in the Basements you

terrace

From podium