VINCENT (WENJIN LAI)
DOB: 1991/10/30 address: U403/589 Elizabeth St. Melbourne Vic 3000 email: VAN.LWJ@GMAIL.COM mobile: 0402513400
EDUCATION
RMIT - art, design, architecture foundation 2012-2013 RMIT - bachelor of architecture 2013-2015 RMIT - master of architecture 2015-2016 Rhinoceros Grasshopper AutoCAD Maya Vray Octane Render 3D coat Meshlab
SKILL
Photoshop Illustrator Indesign Microsoft Suite Processing Eclipse
LANGUAGE English Mandarian Cantonese
PUB
EXPERIENCE
PENUMBRA FACADE PROTOTYPE NICK WILLIAMS @ SIAL 2014
MUSIC ROOM
NICK WILLIAMS @ SIAL 2015
PUBLIC PROGRAM AND EDUCATION HUB FOR THE 20TH BIENNALE OF SYDNEY PATRICK MACASAET @ SUPERSCALE 2016
PENUMBRA FACADE PROTOTYPE
ELECTIVE ASSISTANT TUTOR @MUSICROOM RMIT LEANNE ZILKA @ ZILKA STUDIO 2016
RESEARCH ASSISTANT LEANNE ZILKA @ ZILKA STUDIO PRESENT
FLUCTUATING FAMILIARITY DANDENONG CIVIC CENTRE
IMPORT
SAMPLE
INPUT BUILDING A
ALGORHITHMIC MANIPULATION
VOXEL ENVIRONMENT
VOXEL DATA OF INPUT AN
EW GEOMETRYC
OLOR CODE THAT RECORDS DATA INTERACTIO
Cone linder + Cy Blending
VOXEL DATA OF INPUT B
Cuboids + Cylinder Blending
AUSTRALIA 38.1% VIETNAM 8.7% INDIA 7.4% SRI LANKA 4.3% CAMBODIA 4.0% CHINA 2.5%
CULTURAL DIVERSITY
Islamic muqarna sampling
Forbidden Palace Dandenong United Church
Taj Mahal Church section sampling
Zhonghe Palace Vietnam Rong house Id Gah Mosque
Foster bottle shop
United Church Dandenong
WAL K
ER S T.
Roc Von Restaurant
Dandenong town hall
+
Cozy Corner Shop
Dandenong Town Hall
LO NS DA LE
ST .
Ankor Wat
Cuboids BLENDING
+
BLENDING
+
+
BLENDING
BLENDING
WAL K
ER S T.
N LO
E AL SD
.
ST
TH OM
AS S
T.
ER LK WA
.
ST
FOYER
THEATRE
COMMUNITY GARDEN
GALLERY
HEATRE
ALLERY
COURTYARD
GARDEN
LANEWAY
OYER LIBRARY
COMMUNITY GARDEN
FOYER
CAFE
PLAZA
WALKER ST
GALLERY
COMMUNITY GARDEN
SECTION
LIBRARY
COMMUNITY CENTRE
GEELONG COUNCIL HOUSE x FISHMARKET
GEELONG PIER
EASTERN BEACH SWIMMING ENCLOSURE
CUSTOMER
ENCLOSED COMMERCIAL MODERNIST
POPULATION
VS
OPEN CIVIC IDENTICAL
?
CH
FOYER
MERCHANT
MOORABOOL ST.
SUNDAY
WEEKDAYS
=
+
CHAMBER ROOM
?
MEETING
NON-MEETING
?
CHAMBER ROOM
CUSTOMER/CITIZEN
MERCHANT
library
reception street
cafe
cafe
PIER
COUNCILLOR
green space
market
library
overlook waterfront
public meeting room
KNITTING
reception
library
library
cafe chamber room
market BLENDING
ENCLOSING
green space
DESIGN HUB RESKIN
Left: west facade view Below: early stage folding test
55°
55°
digital models of folding motifs
Collective Radiation
107.14
125.0
142.86
160.71
178.57
196.43
Afternoon Radiation 12:00 - 18:00
Summer (North) June - August
Legend
(kWh/m2)
250.0 < =
232.14
214.29
89.29
71.43
53.57
35.71
17.86
< = 0.0
Morning Radiation 06:00 - 12:00
thermal analysis for different motifs
West
South
parametrized iterations based on open area
D le s o hr h24 W
North
y a 1
2
n W n o Ju o pm 6 rn e To ft A pm 6
East
r te g u in A
a
m
M
To
o
g m in p 2 rn 1
different motifs
Collective Radiation
Collective Radiation
Morning Radiation 06:00 - 12:00
Morning Radiation 06:00 - 12:00
LEGEND (kWh/m2)
500.00<=
Afternoon450 Radiation 12:00 - 18:00 400 350
Summer (West) 300 June - August 250 200 150 100 50 <=0.00
LEGEND (kWh/m2)
500.00<=
Afternoon Radiation 450 12:00 - 18:00 400 350(East) Summer 300 June - August
LEGEND (kWh/m2)
500.00<= 450 400 350 300
250
250
200
200
150
150
100
100
50
50
<=0.00
<=0.00
W N
ET
RE
Afternoon
Dec To Feb
RE ST
SW AN
IA
CIRCULATION
ST ON
ST
OR CT
VI
FOYER
Summer
ET
WORKSPACE
12pm To 6pm
Morning
6am To 12pm
East
OFFICE EXHIBITION AMENITIES
VIEW CORRIDOR
S
24hrs
CAFE
Whole Day
LECTURE THEATRE
E
Left: assumed openess based on program RMIT DESIGN HUB : Right: thermal analysis on each facadeViews and Sunstudies Program, Botton: elevations
Level 10 30800
Level 9 26600
Level 8 22400
Level 7 18200
Level 6 14000
Level 5 9800
Level 4 5600
Level 3
0
South
East
250.00 < =
West
South
Morning
Legend
(kWh/m2)
North
6am To 12pm
West
Legend
(kWh/m2) 250.00 < =
232.14
232.14
214.29
214.29
196.43
196.43
178.57
178.57
160.71
160.71
107.14
Jun Aug
125.00
Winter
142.86
142.86
Afternoon
North
12pm To 6pm
East
125.00 107.14
89.29
53.57
35.71
35.71
17.86
17.86
Level 10 30800
Level 8 22400
Level 8 22400
Level 7 18200
Level 7 18200
Level 6 14000
Level 6 14000
Level 5 9800
Level 3
Level 8 22400
Level 7 18200
Level 6 14000
Level 5 9800
Level 4 5600
0
Level 4 5600
Level 3 0
Level 2
24hrs
Level 9 26600
Level 5 9800
Level 4 5600
< = 0.00
Level 10 30800
Level 9 26600
Level 9 26600
Whole Day
71.43
53.57
< = 0.00
Level 10 30800
89.29
71.43
Level 3 0
-4200
Level 2 -4200
grid distortion test
south facade
Top: corner interior Right: view from Swanston St.
C
B
A
Roof RL 56.00
Level 13 FFL 52.00 BALCONY FFL 47.70 PF
Level 12 FFL 48.00
Level 11 FFL 44.00
BALCONY FFL 39.70 PF
Level 10 FFL 40.00
BALCONY FFL 35.70 PF
Level 9 FFL 36.00
Level 8 FFL 32.00
BALCONY FFL 27.70 PF
Level 7 FFL 28.00
Level 6 FFL 24.00
BALCONY FFL 19.70 PF
Level 5 FFL 20.00
Level 4 FFL 16.00
Level 3 FFL 12.00
BALCONY FFL 7.70 PF
Level 2 FFL 8.00 BALCONY FFL 3.70 PF
D1
D10
Ground Floor FFL 0.30 Ground GL 0.00
150
CIRCUIT BOARD TOWER
Level 1 FFL 4.00
3
2
1
150
FFL 52.00
CP
CP
GENERAL NOTES
FFL 20.00
Basement 1 FFL -3.00
RAIN HARVESTING FFL -6.00 FS
3850 470 3530
4000 4000
DOWNLIGHT - RECESSED CAN - 152mm INCANDESCENT 120V FFL 20.00
TI
470
Level 5
E
PENDANT LIGHT FEMALE - LINEAR - 1 LAMP - 2400mm 277V
DISABLE TOILET
MALE TOILET
FFL 16.00
FFL 16.00
TI
TOILET FFL 16.00
TI
TI
TI
MALE TOILET FFL 12.00
470
FEMALE TOILET
3530
FFL 12.00
FFL 12.00
TI
4000
Boutique Speculative Office Tower
DISABLE TOILET
TI
MALE TOILET
FEMALE TOILET
FFL 8.00
FFL 8.00
TI
TI
470
4000
81-89 BOUVERIE ST, CARLTON, 3053 VIC.
FFL 8.00
3530
DISABLE TOILET
TI
DISABLE TOILET
MALE TOILET
FEMALE TOILET
FFL 4.00
FFL 4.00
FFL 4.00
Project number TI
150
MALE TOILET
FEMALE TOILET
FFL 0.30
FFL 0.30
FFL 0.30
TI
Drawn by
2850
3000
20/05/2014
TI
Ground Floor FFL 0.30 Ground
Checked by
CARPARK FFL -3.00
470
Level 1 FFL 4.00
TI
001
TI
DISABLE TOILET
GL 0.00
FS
Basement 1 FFL -3.00 STORAGE FFL -6.00 FS
Author Checker
Basement 2
Basement 2 FFL -6.00
3530
D
TI
150
GL 0.00
FFL -3.00
470
CEILING LIGHT - FLAT ROUND - 110W 277V
TI
Date
Ground CARPARK
3530
FFL 20.00
C
470
FS
FFL 0.30
470
FEMALE TOILET
4000
MALE TOILET
FFL 20.00
3530
LIGHT TYPES
DISABLE TOILET
TI
470
GL 0.00
2850
FS
CERAMIC FLOOR TILINGFFL 24.00
300
3230
OUTDOOR CAFE
1:250 FFL -6.00
TI
TI
FFL 8.00
4000
FFL 4.00
FS
BIKE RACKS
TOILET FFL 24.00
TI
Level 1
Checker
Scale
FFL 24.00
CONCRETE FLOOR SLAB WITH PLASTIC FLOOR FINISH
TI
470
CP
A200
300mm ELEVATED FLOOR WITH CARPET FINISH FEMALE
MALE TOILET
FFL 24.00
PF
SECTION A 4000
3530
FFL 4.00
Ground Floor
GL 0.00
CP
DISABLE TOILET
Level 2
FFL 8.00
OFFICE
Author
Ground
Level 7
FFL SLAB 28.00 150mm CONCRETE FLOOR
Level 2
20/05/2014
CP
TI
FFL 12.00
4000
3530
CP
FFL 0.30
FFL 28.00
TI
Level 3
FFL 12.00
FFL 8.00
FOYER
FFL 28.00
TI
Level 3
OFFICE
Checked by
FEMALE
TOILET 20mm PLASTERBOARD WITH CERAMIC TILES FINISH
MALE TOILET
FFL 28.00
470
CP
FFL 4.00
W05
FFL 16.00
4000
3530
FFL 12.00
RECEPTION
DISABLE TOILET
Level 4
MANAGER ROOM
001
4000
470
6mm SINGLE GLAZED WALL
470
W04
Level 4
EAST ELEVATION
4000
470
FFL 15.70
81-89 BOUVERIE ST, CARLTON, 3053 VIC. CP
TI
140mm TIMBER STUD WALL WITH PLASTERBAORD Level 8 FINISH
4000
PF
FFL 12.00
FFL 32.00
TI
W03
3530
BALCONY
CP
FFL 16.00
4000
470
FFL 32.00
TI
4000
MALE TOILET
FFL 32.00
470
OFFICE
CP
4000
OFFICE
3530
FFL 20.00
Boutique Speculative Office Tower
3530
300mm CONCRETE LOAD-BEARING WALL WITH FEMALE TOILET FINISH PLASTERBOARD
DISABLE TOILET
470
Level 5
RECEPTION
TI
Level 9 CONCRETE 300mm THERMOMASS PRECAST FFL 36.00 PANELS WITH POLYSTYRENE INSULATION
4000
FFL 20.00
FFL 16.00
FEMALE TOILET FFL 36.00
TI
3230
CP
FFL 36.00
TI
3530
FFL 36.00
4000
OFFICE
MALE TOILET
WALL TYPES
4000
4000
LEGEND
DISABLE TOILET
3530
FFL 24.00
CP
FFL 20.00
TI
Level 6
Level 6
RECEPTION
FFL 40.00
TI
300
PENDANT LIGHT - LINEAR - 1 LAMP - 2400mm 277V
3530
FFL 40.00
TI
150
E
470 470
FFL 40.00
2850
DOWNLIGHT - RECESSED CAN - 152mm INCANDESCENT 120V
470 4000
3230
470
PF
D
300
150
470
FFL 23.70
Drawn by
Ground Floor
470
BALCONY
CEILING LIGHT - FLAT ROUND - 110W 277V
Date
THE CONTRACTOR SHALL VERIFY ALL JOB SITE CONDITIONS FEMALE MALE TOILET TOILET AND RELATED DIMENSIONS.
FS 4000
CP
3530
FFL 24.00
CP
TI
DISABLE TOILET
3000
QUEENSBERRY ST
OFFICE
FFL 24.00
CP
Level 1 FFL 4.00
Level 7 FFL 28.00
C
4000
3530
OFFICE
FFL 44.00
TI
FLOOR FINISHES
CERAMIC FLOOR TILING
Project number 4000
3530
CP
FFL 28.00
FFL 16.00
Level 2 FFL 8.00
OFFICE
CP
CONCRETE FLOOR SLAB WITH PLASTIC FLOOR FINISH
4000
3530
FFL 12.00
RECEPTION FFL 28.00
Level 3
FFL 44.00
TI
FFL 32.00
4000
300mm ELEVATED FLOOR WITH CARPET FINISH
3530
CP
3530
470 470
Level 4
FFL 32.00
LIGHT TYPES
NEIGHBOURING BUILDING
FEMALE
FFL 44.00
Level 8
150mm CONCRETE FLOOR SLAB
470 4000
3530 470
4000
3530 3530
4000
470
Level 5
3530
20mm PLASTERBOARD WITH CERAMIC TILES FINISH
FS
TI
MALE TOILET TOILET ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE CONTRACT DRAWINGS AND OR SPECIFICATIONS SHALL BE BROUGHTLevel TO THE ATTENTION OF 11 THE ENGINEER BEORE PROCEEDING WITH ANY WORK FFL 44.00 INVOLVED.
W02
PF
CP
FLOOR FINISHES
Level 6
FFL 16.00
Level 9 FFL 36.00
FFL 31.70
FFL 32.00
DISABLE TOILET
W01
BALCONY
OFFICE
FFL 48.00
3000
6mm SINGLE GLAZED WALL OFFICE
FEMALE TOILET
150
W04
TI
470
140mm TIMBER STUD WALL WITH PLASTERBAORD FINISH
TI
FFL 20.00
CP
FFL 36.00
W03
W05
Level 7
FFL 24.00
OFFICE
CP
FFL 36.00
PF
FFL 28.00
RECEPTION
3530
300mm CONCRETE LOAD-BEARING WALL WITH PLASTERBOARD FINISH
4000
W02
CP
4000
3530
300mm THERMOMASS PRECAST CONCRETE PANELS WITH POLYSTYRENE INSULATION
FFL 32.00
Level 8 FFL 32.00
Level 10 FFL 40.00
W01
FFL 48.00
TI
ALL CONSTRUCTION SHALL BE IN ACCORDANCE TO THE Level 10 LASTEST EDITION OF THE UNIFORM BUILDING CODE. FFL 40.00
470
470 4000
3530 3530
4000
470
Level 9 FFL 36.00
470
CP
4000
3530
FFL 40.00
WALL TYPES
Level 10
FFL 0.30
Level 11 FFL 44.00
OFFICE
LEGEND
MALE TOILET
FFL 48.00
470
CP
ALL CONSTRUCTION SHALL BE IN ACCORDANCE TO THE LASTEST EDITION OF THE UNIFORM BUILDING CODE.
GENERAL NOTES
3530
470 3530
FFL 44.00
CP
DISABLE TOILET
UNLESS OTHERWISE NOTED, ALL DETAILS, SECTIONS AND Level 12 NOTES SHOWN ON THE CONTRACT DRAWINGS ARE INTENDED FFL 48.00 TO BE TYPICAL AND SHALL APPLY TO SIMILAR CONDITIONS ELSEWHERE. 4000
MANAGER ROOM
FFL 44.00
FFL 52.00
Level 12 FFL 48.00
THE CONTRACTOR SHALL VERIFY ALL JOB SITE CONDITIONS AND RELATED DIMENSIONS.
FFL 40.00
TI
2850
ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE CONTRACT DRAWINGS AND OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEORE PROCEEDING WITH ANY WORK INVOLVED. RECEPTION
Level 11
FEMALE TOILET FFL 52.00
TI
470
CP
FFL 44.00
FFL 52.00
TI
124 LT LA TROBE ST, MELBOURNE, 3000 VIC. 4000
3530
FFL 52.00
FFL 48.00
Level 12
MALE TOILET
FFL 52.00
Level 13
UNLESS OTHERWISE NOTED, ALL DETAILS, SECTIONS AND NOTES SHOWN ON THE CONTRACT DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR CONDITIONS OFFICE ELSEWHERE.
FFL 48.00
DISABLE TOILET
Level 13
4000
Level 13 FFL 52.00
3850
RECEPTION 124 LT LA TROBE ST, MELBOURNE, 3000 VIC. MANAGER ROOM FFL 52.00
FFL 56.00
4000
RL 56.00
150
Roof Roof
Roof
4000
4
A
RL 56.00
ONY
70
B
3000
C
A
Scale
FFL -6.00
1:250
1
2
3
8128
1
4
6472
2 5228 5068
5400
9382 12140
124 LT LA TROBE ST, MELBOURNE, 3000 VIC.
A
60
A
W01
GENERAL NOTES
61
3158
OUTDOOR CAFE GL 0.00
THE CONTRACTOR SHALL VERIFY ALL JOB SITE CONDITIONS AND RELATED DIMENSIONS.
D6
ALL CONSTRUCTION SHALL BE IN ACCORDANCE TO THE LASTEST EDITION OF THE UNIFORM BUILDING CODE.
W04
CAFE BAR
LEGEND
PF
ENTRANCE
W01
FFL 0.30
PF
SUSTATION
300
W02
GL 0.00
RAMP
FS
UP
WALL TYPES W01
MANAGER ROOM
OFFIC
W04
FFL 4.00
FFL 4.00
CP
CP
300mm THERMOMASS PRECAST CONCRETE PANELS WITH POLYSTYRENE INSULATION
W02
300mm CONCRETE LOAD-BEARING WALL WITH PLASTERBOARD FINISH
W03
140mm TIMBER STUD WALL WITH PLASTERBAORD FINISH
W04
6mm SINGLE GLAZED WALL
W05
20mm PLASTERBOARD WITH CERAMIC TILES FINISH
FLOOR FINISHES
D1
W03
FS
150mm CONCRETE FLOOR SLAB
CP
300mm ELEVATED FLOOR WITH CARPET FINISH
PF
CONCRETE FLOOR SLAB WITH PLASTIC FLOOR FINISH
TI
CERAMIC FLOOR TILING
D1 W04
GRADE 1:4
6100
D5 D10
FOYER
RAMP
FFL 0.30
DN
GRADE 1:4
LIGHT TYPES
5821
15556 10250
W02
3975
FFL 0.30
7825
300
FS
ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE CONTRACT DRAWINGS AND OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEORE PROCEEDING WITH ANY WORK 64 INVOLVED.
15556 140
3093
UNLESS OTHERWISE NOTED, ALL DETAILS, SECTIONS AND NOTES SHOWN ON THE CONTRACT DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR CONDITIONS ELSEWHERE.
D6
63
RECEPT
W02
C
CEILING LIGHT - FLAT ROUND - 110W 277V
D
DOWNLIGHT - RECESSED CAN - 152mm INCANDESCENT 120V
E
PENDANT LIGHT - LINEAR - 1 LAMP - 2400mm 277V
FFL 4.00
MEETING ROOM
CP
FFL 4.00
CP
PF
D8
TI D3
D3
C 2008
W01
2778
B
D2
UP
MALE TOILET FFL 0.30
DISABLE TOILET FFL 0.30
W05
D8
RISER
TI
LIFT 1
LIFT 2
FS
18 RISERS @ 183.5mm
DN
Project number Date
2602
1025
2262
2275
5100
FF
TI
D8
D3
TI D3
W05
001
C
20/05/2014
2008
Author
Drawn by
Checker
Checked by
A101 Scale
D9 MALE TOILET FFL 0.30
FEMALE TOILET FFL 0.30
GROUND FLOOR
LO
W03
81-89 BOUVERIE ST, CARLTON, 3053 VIC. D9
2454 2144
TI
D9
2304
FEMALE TOILET FFL 0.30
Boutique Speculative Office Tower 1330
D1
1442
D1
D9
2454 2304
B
1472
D1
1:100
2778
W01
DISABLE TOILET FFL 0.30
D8
RISER
TI
2602
1025
LIFT 1
2262
2
3
4
9382 12140
5400
61
1
2652
2 8128
124 LT LA TROBE ST, MELBOURNE, 3000 VIC.
GENERAL NOTES
67
3
4
6472
5410
124 LT LA TROBE ST, ME
GENERAL NOTES
UNLESS OTHERWISE NOTED, ALL D NOTES SHOWN ON THE CONTRACT TO BE TYPICAL AND SHALL APPLY ELSEWHERE.
UNLESS OTHERWISE NOTED, ALL DETAILS, SECTIONS AND NOTES SHOWN ON THE CONTRACT DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR CONDITIONS ELSEWHERE.
A
FD
ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE CONTRACT DRAWINGS AND OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEORE PROCEEDING WITH ANY WORK INVOLVED.
FALL 1°
FD
FD
FD
THE CONTRACTOR SHALL VERIFY A AND RELATED DIMENSIONS.
THE CONTRACTOR SHALL VERIFY ALL JOB SITE CONDITIONS AND RELATED DIMENSIONS.
LEGEND WALL TYPES
W02
300mm CONCRETE LOAD-BEARING WALL WITH PLASTERBOARD FINISH
W03
140mm TIMBER STUD WALL WITH PLASTERBAORD FINISH
W04
6mm SINGLE GLAZED WALL
W05
20mm PLASTERBOARD WITH CERAMIC TILES FINISH
D1 W04 D6
FS
150mm CONCRETE FLOOR SLAB
CP
300mm ELEVATED FLOOR WITH CARPET FINISH
PF
CONCRETE FLOOR SLAB WITH PLASTIC FLOOR FINISH
TI
CERAMIC FLOOR TILING
W01
RIDGE
RL 56.00 FS
FFL 4.00
CP
CP
PENDANT LIGHT - LINEAR - 1 LAMP - 2400mm 277V
D2
LIFT 2
FS
18 RISERS @ 183.5mm
2504
UP DN
FALL 1°
FALL 1°
2275
5100
6mm SINGLE GLAZED W
W05
20mm PLASTERBOARD
150mm CONCRETE FLO
CP
300mm ELEVATED FLO
PF
CONCRETE FLOOR SL FINISH
TI
CERAMIC FLOOR TILIN
C
CEILING LIGHT - FLAT
D
DOWNLIGHT - RECESS INCANDESCENT 120V
E
PENDANT LIGHT - LINE
Boutique Sp Office T
81-89 BOUVERIE ST, C FD
B
Project number
C
W02
001 FD
LIFT 1
LIFT 2
FS
18 RISERS @ 183.5mm
Project number
DN
W01
Date
8128
1185 300 2262 300 2275 300
5250
Drawn by Checked by
Checker
Checked by
A10
A104 Scale
RISER
FD
20/05/2014
Author
Drawn by
ROOF P
D2
TYPICAL FLOOR 1 Date
2262
W04
81-89 BOUVERIE ST, CARLTON, 3053 VIC.
2374
CP
1025
E
1620
D4 FFL 4.00
LIFT 1
CEILING LIGHT - FLAT ROUND - 110W 277V DOWNLIGHT - RECESSED CAN - 152mm INCANDESCENT 120V
Boutique Speculative Office Tower
LOBBY
RISER
C D
RIDGE
FFL 4.00
62
4826
PANTRY
W02
140mm TIMBER STUD W FINISH
LIGHT TYPES
LIGHT TYPES
RECEPTION
300mm CONCRETE LO PLASTERBOARD FINIS
W03
FS
RIDGE
ROOF
300mm THERMOMASS PANELS WITH POLYST
W02
FLOOR FINISHES
FALL 1°
FLOOR FINISHES
WALL TYPES
FALL 1°
FALL 1°
300mm THERMOMASS PRECAST CONCRETE PANELS WITH POLYSTYRENE INSULATION
FALL 1°
D7
FALL 1°
W01
FALL 1°
PF
FALL 1°
FFL 3.70
CP
LEGEND RIDGE
BALCONY
15556
W04
FFL 4.00
ALL CONSTRUCTION SHALL BE IN A LASTEST EDITION OF THE UNIFORM
ALL CONSTRUCTION SHALL BE IN ACCORDANCE TO THE LASTEST EDITION OF THE UNIFORM BUILDING CODE.
9115
FD
OFFICE
ALL OMISSIONS OR CONFLICTS BE ELEMENTS OF THE CONTRACT DRA SPECIFICATIONS SHALL BE BROUG THE ENGINEER BEORE PROCEEDIN INVOLVED.
Scale
1:100
124 LT LA TROBE ST, MELBOURNE, 3000 VIC.
GENERAL NOTES UNLESS OTHERWISE NOTED, ALL DETAILS, SECTIONS AND NOTES SHOWN ON THE CONTRACT DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR CONDITIONS ELSEWHERE. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE CONTRACT DRAWINGS AND OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEORE PROCEEDING WITH ANY WORK INVOLVED.
158
1113
1882
240 365
863
2838
863
8140
240
2215
2662
863
120
1856
THE CONTRACTOR SHALL VERIFY ALL JOB SITE CONDITIONS AND RELATED DIMENSIONS. ALL CONSTRUCTION SHALL BE IN ACCORDANCE TO THE LASTEST EDITION OF THE UNIFORM BUILDING CODE.
LEGEND WALL TYPES
240
D9
D9
W01
D8 W05
13951205
W02
300mm CONCRETE LOAD-BEARING WALL WITH PLASTERBOARD FINISH
W03
140mm TIMBER STUD WALL WITH PLASTERBAORD FINISH
W04
6mm SINGLE GLAZED WALL
W05
20mm PLASTERBOARD WITH CERAMIC TILES FINISH
FLOOR FINISHES
FEMALE RESTROOM
MALE RESTROOM
FFL 0.00
140
1052
300mm THERMOMASS PRECAST CONCRETE PANELS WITH POLYSTYRENE INSULATION
FFL 0.00
D3
FS
DISABLE RESTROOM FFL 0.00
D3
150mm CONCRETE FLOOR SLAB
CP
300mm ELEVATED FLOOR WITH CARPET FINISH
PF
CONCRETE FLOOR SLAB WITH PLASTIC FLOOR FINISH
TI
CERAMIC FLOOR TILING
LIGHT TYPES
D8
810
C
CEILING LIGHT - FLAT ROUND - 110W 277V
D
DOWNLIGHT - RECESSED CAN - 152mm INCANDESCENT 120V
E
PENDANT LIGHT - LINEAR - 1 LAMP - 2400mm 277V
Boutique Speculative Office Tower 81-89 BOUVERIE ST, CARLTON, 3053 VIC.
W01
FIGURE PLAN RESTROOM Project number
001
Date 124 LT LA TROBE ST, MELBOURNE, 3000 VIC.
Drawn by
GENERAL NOTES UNLESS OTHERWISE NOTED, ALL DETAILS, SECTIONS AND NOTES SHOWN ON THE CONTRACT DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR CONDITIONS ELSEWHERE.
ALUMINIUM COPING
FLASHING
THE CONTRACTOR SHALL VERIFY ALL JOB SITE CONDITIONS AND RELATED DIMENSIONS.
RAINWATER OUTLET
LEGEND
GENERAL NOTES
ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE CONTRACT DRAWINGS AND OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEORE PROCEEDING WITH ANY WORK INVOLVED.
20mm DOUBLE GLAZED WINDOW
SUBSILL
W01
SILICON SEALANT ON BREAKER ROD
LEGEND W01
W02
300mm CONCRETE LOAD-BEARING WALL WITH PLASTERBOARD FINISH 140mm TIMBER STUD WALL WITH PLASTERBAORD FINISH
CP
INSULATION
300mm ELEVATED FLOOR WITH CARPET FINISH CONCRETE FLOOR SLAB WITH PLASTIC FLOOR
TI
CERAMIC FLOOR TILING
300mm PRECAST CONCRETE PANEL
CEILING LIGHT - FLAT ROUND - 110W 277V
PENDANT LIGHT - LINEAR - 1 LAMP - 2400mm 277V
Boutique Speculative REINFORCED STEEL BAR Office Tower
300mm PRECAST CONCRETE PANEL
10mm FLUOROPOLYMER PAINT
Date Drawn by Checked by
Scale
CP
300mm ELEVATED FLOOR WITH CARPET FINISH
PF
CONCRETE FLOOR SLAB WITH PLASTIC FLOOR FINISH
TI
CERAMIC FLOOR TILING
LIGHT TYPES C
CEILING LIGHT - FLAT ROUND - 110W 277V
D
DOWNLIGHT - RECESSED CAN - 152mm INCANDESCENT 120V
E
PENDANT LIGHT - LINEAR - 1 LAMP - 2400mm 277V
Boutique Speculative Office Tower
TYPICAL DETAIL
300mm CONCRETE BEAM
ROOF DETAIL Project number
20mm PLASTERBOARD WITH CERAMIC TILES FINISH
150mm CONCRETE FLOOR SLAB
81-89 BOUVERIE ST, CARLTON, 3053 VIC.
81-89 BOUVERIE ST, CARLTON, 3053 VIC. 150mm CONCRETE FLOOR SLAB
BOLT
6mm SINGLE GLAZED WALL
SILICON SEALANT ON BREAKER ROD
300mm CONCRETE BEAM 150mm ROOF SLAB
W04
FS
LEVEL 5 FFL 20.00 UNDERSTRUCTURE SUPPORT PEDESTAL
LIGHT TYPES
E
300mm CONCRETE LOAD-BEARING WALL WITH PLASTERBOARD FINISH 140mm TIMBER STUD WALL WITH PLASTERBAORD FINISH
W05
REINFORCED STEEL BAR
FLOOR COOLING AND HEATING D DOWNLIGHT - RECESSED CAN - 152mm SYSTEM INCANDESCENT 120V
DAMP PROOF MEMBRANE
300mm THERMOMASS PRECAST CONCRETE PANELS WITH POLYSTYRENE INSULATION
W02 W03
FLOOR FINISHES
PF
C
SILL
150mm CONCRETE FLOOR SLAB
300mm HEIGHT RAISED FINISH FLOOR WITH CARPET
ROOF FFL 56.00
LED LIGHT
6mm SINGLE GLAZED WALL
W05 20mm PLASTERBOARD WITH CERAMIC TILES FINISH FLOOR DIFFUSER
FS
1:25
WALL TYPES
FLOOR FINISHES
CONCRETE ROOF SCREED
50mm POLYSTYRENE INSULATION
ALL CONSTRUCTION SHALL BE IN ACCORDANCE TO THE LASTEST EDITION OF THE UNIFORM BUILDING CODE.
300mm THERMOMASS PRECAST CONCRETE PANELS WITH POLYSTYRENE INSULATION
W03 W04
20mm DOUBLE GLAZED WINDOW
REINFORCED STEEL BAR
THE CONTRACTOR SHALL VERIFY ALL JOB SITE CONDITIONS AND RELATED DIMENSIONS.
Scale
WALL TYPES
LED LIGHT
Checker
124 LT LA TROBE ST, MELBOURNE, 3000 VIC.
UNLESS OTHERWISE NOTED, ALL DETAILS, SECTIONS AND NOTES SHOWN ON THE CONTRACT DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR CONDITIONS ELSEWHERE.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE TO THE LASTEST EDITION OF THE UNIFORM BUILDING CODE.
10mm FLUOROPOLYMER PAINT
Author
Checked by
ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE CONTRACT DRAWINGS AND OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEORE PROCEEDING WITH ANY WORK INVOLVED.
TIMBER TOP HAT
SUBSILL
20/05/2014
FLOOR - WALL REBAR CONNECTION
001 20/05/2014
50mm POLYSTYRENE INSULATION
Project number Date Drawn by
BOLT
Checked by
Author Checker
Scale
001 20/05/2014 Author Checker
GE
2927
3120 391
404
2730
977
AL ELE SP TH INV
W2-R
581
2740
2665
2484
2585
3396
2976
2000
W3-A
2000
924
740
412
733 4404
4727
UN NO TO ELS
665 5396
478
TH AN
W4-A
AL LAS
585
LE
4976
936
714
2716
2475
WA
2000
W0
N1-B 2000
740
581
733
714
N3-B
4581
W0
2714 2740
2585
4405
W0
W0
2829
2000
E3-B
W0
4731
2000
2581
FLO
FS
4976
CP
2000
PF
2000
TI
714
924
733
LIG
665
C
2000 2000
N2-B
2829
2829 2714
W1-F 2581
2585
D
W2-F 2404
2976
E
2665 E2-b
Pro
Da
Dra
Ch
Sca
BASE SURFACE
COMPLEX GEOMETRY
CELLS
COMPLEX GEOMETRY
PENUMBRA FACADE PROTOTYPE Project Leader: Richard Blythe x Paul Minifie Design Leadr: Nick Williams
GLASS CAP TOP CELL CENTRE SLOT NUMBERING
LEX GEOMETRY
PLEX GEOMETRY
TYPE
Minifie
EDGE SLOT
COMPLEX GEOMETRY
JOINT
FILM ID CLAMP WIRE BOT CELL TESSELLATION
COMPLEX GEOMETRY
CEDAR VENEER PINE
MUSICROOM
THE MUSIC ROOM
Project Leader: Nick WIlliams Technical Consultant: John Cherry
GEOMETRY OPTIMIZATION GEOMETRY OPTIMIZATION