PORTFOLIO
VIPUL NARESH MALI 2020-23
I’m pursuing 4 year Bacholors of Architecture from Kamla Raheja Institute of Architectural and Environmental Studies, Mumbai (KRVIA). .
Through my studies and research, I have understood the profound impact of architecture on human emotions, behavior, and overall well-being. I believe that incorporating phenomenological approch of design can result in spaces that resonate deeply with their users, creating sense of connection and spacial experience. My sincere interest in the fascinating intersection of psychology of space and architecture has captivated me and inspired me to learn core architecture having a strong focus on user centric built environment, which will help me explore more fascinating ideas further.
CONTACT
PHONE NO - 9657057711
MAIL ID - vipul.mali@krvia.ac.in
INSTA - @vnm659
17.04.2002
INTERESTS
Reading, Learning And Curiousity About Following -
• Human Psychology
• Enviornmental Psycholo gy
• Behaviourism
• Neuroscience Applied To Architecture
EDUCATION
2020-25 B. ARCH -
USM’s Kamla Raheja Vidyanidhi Institute for Architecture and Environmental Studies
Juhu, Mumbai, Maharashtra, India. Pin – 400 049
Ph: +91 8369485581 / 8454812762
Email: admin@krvia.ac.in
2020 XII HSCJeevandeep Shaikshnik Santha Arts Commerce and Science College, Goveli
2018 X SSCNew English School, Murbad
LANGUAGES
• Marathi
• Hindi
• English
RESPONSIBILITIES
• Archival Club Secretary, RCKRVIA
• Class Representative 3rd Year, KRVIA
• Chess Club Representative, KRVIA
HOBBIES
• Playing Chess (District And Zonal Level Chess Tournaments )
• Lisning And Writing Poems
• Collecting Flowers And Stones
• Swimming
SKILLS
• AutoCad
• Revit
• Adobe Photoshop
• Adobe Indesign
• Adobe Illustrator
• Sketchup
• Enscape
• Microsoft Office
• Hand Drafting
• Physical Model Making
• Laser Cut Model Making
ELECTIVES
• Ornamentation Is A Crime ! By Ar. Aishwarya Padmanabh an
• Railway Architecture By Ar. Aishwarya Padmanabh an
• Urban Spaces By Dr. Andre Baptista
• Embodying the Elsewhere By Ar. Shivani Shah
• Sustainable Design & Energy Simulation. By Ar. Udeet Methala
WORKSHOPS AND EXPERIENCE
• Two Times Summer Internship At Ar. ROHIT KUDALE
(Visiting Fcaulty KRVIA)
• Introduction to Architectural Psychology for Architects and Designers S Ar. Prachi Sharma
(Masters in Neuroscience Applied to Architectural Design. Assistant Professor at CTES, Mumbai)
VIPUL NARESH MALI
1 EMPHASIS THE FLAW 2 SLAUGHTERING WORSHOP MODEL 3 BOAT MAKING WORKSHOP 4 WORKING DRAWINGS 5 INNER CORE 6 HORSE STABLE 7 CAR PARKING 8 TO DIG 9 REPRESENTING THE SACRED! 10 26 WAYS OF SEEING BHOPAL 11 DRAWING AS A BUILDING 12 ORNAMENTATION IS A CRIME ! 13 RAILWAY ARCHITECTURE 14 URBAN SPACES 15 BUILDING ANALYSIS EXPRESSION THROUGH STORY 16 17 MODEL MAKING AND EXPLORATION 18 IMAGINARY SCHOOL 19 PLATONIC PLAYGROUND 20 GARDEN OF MEMORIES 21 TENSIGRITY MODEL 22 EXPLORING STRUCTURE INDEX
EMPHASIS THE FLAW
AD SEM 6 CHIDAMBARAM GUIDE - SHAIL BAJARIYA
OBLIQUE STATERGY : EMPHASIS THE FLAW FOR EXAMPLE IF WE LOOK INTO MAHARASHTRA CONTEXT LIKE ALANDI, JEJURI, PANDHARPUR ETC, DHARMASHALA AND TEMPLE COMPLEXES HAVE BEEN MUTUAL RELATIONSHIP FROM PAST. THERE ARE NUMBER OF DHARMASHALAS IN THE PERIPHERY OF TEMPLE COMPLEXES OWNED BY DIFFERENT COMMUNITIES OR PEOPLES. BUT IN CHIDAMBARAM THAT IS NOT THE CASE. THERE IS NOT A SINGLE DHARMASHALA IN THE WHOLE TEMPLE TOWN FOR THE USE OF COMUNITY OR PEOPLE, WHICH I TOOK IT IS AS A PROGRAME. AS WELL TEMPLE COMPLEX HAVE SOME SOCIAL STRUCTURE IN TERMS OF CASTE SYSTEM WHICH IS ONE OF THE FLAW AND BUILDING IS DESIGNED I SUCH A WAY TO EMPHASIS THIS FLAW THOUGH FORM AND SOMEWHAT CRITIQUE TO CASTE SYSTEM.
OBLIQUE STATERGY : EMPHASIS THE FLAW IF WE LOOK INTO FOR EXAMPLE MAHARASHTRA CONTEXT LIKE ALANDI, JEJURI, PANDHARPUR ETC, DHARMASHALA AND TEMPLE COMPLEXES HAVE BEEN MUTUAL RELATIONSHIP FROM PAST. THERE ARE NUMBER OF DHARMASHALAS IN THE PERIPHERY OF TEMPLE COMPLEXES OWNED BY DIFFERENT COMMUNITIES OR PEOPLES. BUT IN CHIDAMBARAM THAT IS NOT THE CASE. THERE IS NOT A SINGLE DHARMASHALA IN THE WHOLE TEMPLE TOWN FOR THE USE OF COMUNITY OR PEOPLE, WHICH IS ONE OF THE FLAW.
LOCATION PLAN
SITE PLAN AND SITE SECTION
SCALE 1:500
- CHIDAMBARAM PROGRAM - DHARMASHALA BUILT ARES - 3000 SQ. M (NEAR NORTH GOPURAM, THOUSAND PILLAR TEMPLE AND TANK) VIPUL N. MALI - 2041 GRID PATTERN PRIVATE SEMIPRIVATE PUBLIC CIRCULATION ZONING DIXITAS BRAMHIN HOUSING COURTYARD DORMITORIES ADMIN KITCHEN BATH & CLOTH CLEAN AMPHI WC BLOCK +150 +300 A' A B' B C C' +450 +600 +300 +600 +600 +150 +150 +150 +150 -450 -450 +2550 +4950 +600 +150 +300 +600 +300 +300 +150 -750 +600 +600 -900 +300 +300 +300 +150 +300 +600 +600 +600 +600 +450 +1800 +600 +600 300 0 +600 +450 +600 +600 +450 UP STAFFROOM KITCHEN BHOJANALAY UNTENSILS CLEANING SERVICES W0MEN WC MEN WC PANTRY COUNTER DORMITORY DORMITORY DORMITORY ADMIN SPACE RECEPTION STORAGE
SITE
SCALE 1:2000 SCALE 1:100 SECTION CC' SCALE 1:100 SECTION AA' SCALE 1:100 SECTION BB' SCALE 1:100 GF PLAN STORAGE WC COUNTER KITCHEN KITCHEN WC WC LIVING ROOM L.R. KITCHEN KITCHEN WC WC LIVING ROOM L.R. +600 +450 G.R. MEN G.R. WOMEN BATHING SPACE
SECTION CC’ Scale 1:500 SECTION BB’ Scale 1:500 SECTION CC’ Scale 1:500 GF PLAN Scale 1:500 SITE
SITE
1
PLAN AND SITE SECTION Scale 1:2500
PLAN AND SITE SECTION Scale 1:2500
DEONAR ABBATOIR IS ONE OF THE LARGEST SLAUGHTER HOUSE IN THE MUMBAI AND THROUGH THE SITE
OBSERVATIONS I THOUGHT THAT
ANIMAL IS AN IMPORTANT PART OF GOVANDI. AFTER VISITING BUTCHER
SHOPS AND SLAUGHTER HOUSE I
THOUGHT THAT THEIR IS NEED OF
BASIC EDUCATION AND AWARENESS ABOUT HYGIENE AND CLEANLINESS WHILE SLAUGHTERING AS WELL PROPER DEISPOSAL OF WASTE PARTS AND BLOOD. SO I TOOK IT AS A PROGRAME.
FORM OF BUILDING IS EXTRACES FROM THE TRACES OF NEARBY CONTEXT, AS GOVANDI HAS HUGE SLUM AREA AS WELL I THOUGHT TO MAKE BUILDING AS A STATEMENT THORUGH TO LOCALS SPECIALLY WHO ARE IN THIS BUISNESS.
BUILDING HAVE A PROGRAME SUCH AS MEDICAL AREA FOR GOATS, THEN AFTER REGULAR CHECKUP GOATS ARE KEPT IN STABLE AREA AND THIRD PROGRAME IS SLAUGHTERING WORKSHOP. FROM WHICH I TRIED TO CREATE KIND OF MODEL FOR A PROGRAME REALATED TO ANIMAL ESPECIALLY GOAT.
PROCESS WORK LV900 LV1200 LV0 LV2400 SECTION AA' Metal Sheet Covered Gutter LV300 Laboratory LV@900 1:12Slope LandingPlatform LV300 DN DN LV300 AdminOfficeLV300 Skins Tripery Offals room Suspension hind limb Incinerator Manure From Meat KID GOAT SHEDS Pack Room Cloth Changing Room 1:12 Slope LV300 LV300 LV900 DN LV900 LV900 1:12 Slope LV566 LV@900 Brushing Bathing ClippingAnd Trimming Hooves LV450 LV300 LV300MetalSheetCoveredGutter LV450 Water and Food Pit LV600 Boarding LV300 Gutter LV750 Boarding LV900 Water and Food Pit LV1200 Isolation Space LV450 CheckOffice Metal Sheet LV900 SurgeryRoom ExaminationSpace LV300 LV300 Storage Hay Barrels BIOGAS PLANT Food Pit LV1200 Water LV1200 LV1200Food Metal Sheet Covered Gutter LV900 LV300 LV300 LV300 CarPark Stunning Room Bleeding LV1000 LV1000 LV1000 LV1000 (Breeding Control Space) LV300 A' SERVICES LV300 ANIMAL CIRCULATION HUMAN CIRCULATION ANIMAL + HUMAN SOUTH WEST ELEVATION SECTION CC' NORTH WEST ELEVATION Tripery processing area LV@900 LV@0 LV@900 1:12 Slope LV@300 Landing Platform Slaughter and carcasses Isolation Room Cooling Room Tripery Meat Storage Space Tripery processing area Shed Meat Storage Space WORK Storage Tripery processing area Services 1:12 Slope LV0 LV900 B ANIMAL CIRCULATION HUMAN CIRCULATION C
PROCESS WORK LV900 LV1200 LV0 LV2400 SECTION AA' Metal Sheet Covered Gutter LV300 Laboratory LV@900 1:12Slope LandingPlatform LV300 DN DN LV300 AdminOfficeLV300 Skins Tripery Offals room Incinerator Manure From Meat KID GOAT SHEDS Cloth Changing Room 1:12 Slope Landing Platform LV300 LV300 DN LV900 LV900 LV566 LV@900 Brushing Bathing ClippingAnd Trimming Hooves LV450 LV300 LV300MetalSheetCoveredGutter LV450 Water and Food Pit LV600 Boarding LV300 Gutter LV750 Boarding LV900 Water and Food Pit LV1200 Isolation Space LV450 CheckOffice Metal Sheet LV900 SurgeryRoom ExaminationSpace LV300 LV300 Storage Hay Barrels BIOGAS BIOGAS PLANT Food Pit LV1200 Water Channel LV1200 LV1200 Metal Sheet Covered Gutter LV900 LV300 LV300 CarPark Stunning Room Bleeding LV1000 LV1000 LV1000 LV1000 (Breeding Control Space) LV300 B' A' SERVICES LV300 ANIMAL CIRCULATION HUMAN CIRCULATION ANIMAL + HUMAN C' SOUTH WEST ELEVATION SECTION CC' NORTH WEST ELEVATION 2 AD SEM 5 GOVANDI GUIDE - VINIT SLAUGHTERING WORSHOP MODEL PROCESS WORK Metal Sheet Covered Gutter LV300 Laboratory LV@900 1:12Slope LandingPlatform LV300 DN DN LV300 AdminOfficeLV300 12 4M 4.8M RCC Prefabricated Wall Panels 1.5M 1M Skins Tripery Offals room Suspension by hind limb Incinerator Meat KID GOAT SHEDS Cloth Changing Room 1:12 Slope Landing Platform LV300 LV300 LV300 LV0 LV600 LV900 FEMALE GOAT SHEDS MALE GOAT SHEDS LV900 LV900 1:12 Slope UP LV566 LV@900 Brushing Bathing ClippingAnd Trimming Hooves LV450 LV300 LV300MetalSheetCoveredGutter LV450 Water and Food Pit LV600 Boarding LV300 Gutter LV750 Boarding LV900 Water and Food Pit LV1200 Tools And Food Grinder Isolation Space LV450 0.5M CheckOffice Perforated Metal Sheet Timber Slatted Flooring Deep Litter (Dirt And Straw) Button Top Stall Mat Cement Coba Floor Metal Sheet LV900 1.5M Slatted Timber Panel Flooring SurgeryRoom ExaminationSpace LV300 LV300 Storage Hay Cereal Other BIOGAS DIGESTER PLANT 3M Food Pit LV1200 Water LV1200 Food Pit LV1200 Food Pit LV1200 Metal Sheet Covered Gutter LV900 Metal Sheet Covered Gutter LV900 Metal Sheet Covered Gutter LV900 LV300 LV300 LV300 CarPark Stunning Room Bleeding LV1000 LV1000 LV1000 LV1000 (Breeding Control Space) 6M B B' SERVICES LV300 ANIMAL CIRCULATION HUMAN CIRCULATION ANIMAL + HUMAN C C' ARCHITECTURAL DESIGN STUDIO 07/10/22 SITE NEAR POST OFFICE, SHIVAJI NAGAR GOVANDI GF PLAN SECTION AA’ SOUTH WEST ELEVATION NORTH WEST ELEVATION SECTION CC’ SITE PLAN SYNTHESIS AXO
BOAT MAKING WORKSHOP
AD SEM 4 UTTAN GUIDE - NIKHIL KHADILKAR
MY FORM IS BASICALLY EVOLVED FROM IMPRESSION OF UTTAN WHICH I GOT AFTER OBSERVING SITE. I OBSERVED SRYING FISHES ON BAMBOO FRAMED STRUCTURE. IT WAS GIVING THE OPPORTUNITY TO CREATE VISUAL CONNECTION FROM ONE SIDE TO ANOTHER THROUGH VOID INBETWEEN. I WANTED THE SKIN TO BE AS MINIMAL AS POSSIBLE. SO I HAVE USED WOODEN PLATES AS A SKIN AND WOODEN LOUVERS WITH JALI AS A OPENING AT SOUTH AND WEST. WHICH CAN BE TILTED AT CERTAIN ANGLE TO RESTRUCT THE HARSH SUNLIGHT TO COME IN. AS WELL I’VE USED CYLINDRICAL PAPER TUBES WITH GAPS IN BETWEEN AT NORTH AND EAST. SO I’VE TRIED TO GIVE THE ESSENCE OF THE VOID IN BETWEEN THE STRUCTURE TO CREATE SORT OF VISUAL CONNECTION FROM ROADSIDE TO SEA COAST.
SITE - UTTAN
BOAT BUILDING
SUBTRACTIVE STRUCTURE GRID PATTERN PRIVATE SEMIPRIVATE PUBLIC HUMAN CIRCULATION BASE 1 10 11 12 1 0 12 16 24 28 32 SITE PLAN SCALE - 1:500 8 12 16 24 28 SITE PLAN SCALE 1:500 220 MM EXTERNAL DIA STEEL RAILINGS MATERIAL
VIPUL N. MALI 2041 SEM 4 AD - 2022 DIRECT SUNLIGHT INDIRECT SUNLIGHT 3
SITE SECTION
BOAT MAKING WORKSHOP
UP UP DOWN UP DOWN DOWN DOWN DOWN LV @3M LV @0M LV @6M LV @0M LV @7.5M LV @7.5M LV @7.5M LV @0M LV @6M LV @9M LV @ 7.5M LV @9M LV @9M LV @9M LV @9M LV @9M UP PLAN LV @1.5 SCALE - 1:100 PLAN LV @4.5 SCALE - 1:100 PLAN LV @7.5 SCALE - 1:100 PLAN LV @10.5 SCALE - 1:100 LV @0M EQUIPMENT STORAGE ROOM COMPUTER LAB COMPUTER LAB OFFICE/WORKING SPACE CLASSROOM CLASSROOM AV ROOM DORMITERIE DORMITERIE DORMITERIE DORMITERIE SINGLE ROOM SINGLE ROOM SINGLE ROOM SINGLE ROOM LIBRARY BOAT MAKING WORKSOP UP UP SECTION AA' SCALE - 1:100 EAST ELEVATION SCALE - 1:100 SECTION BB' SCALE - 1:100 0 2 6 12M NORTH ELEVATION SCALE - 1:100 A A' A A' A A' A A' B' B B' B B' B B' B PLAN @7.5 M PLAN @10.5 M PLAN @1.5 M PLAN @4.5 M SECTION BB’ SECTION AA’ NORTH ELEVATION EAST ELEVATION 3 AD SEM 4 UTTAN
GUIDE - NIKHIL KHADILKAR
4
WORKING DRAWINGS
WD SEM 5 AUDITORIUM GUIDE - JAMSHID BHIWANDIWALA
1 1 2 3 4 5 6 8 9 10 11 12 1 PALI CHAUK ROAD JUICE ADVENTURES LOW TIDE LINE HIGH TIDE LINE PALI BEACH RESORT EXISTING BOAT BUILDING WORKSOP NATO COMMUNICATION U TAN SEA RESORT 0 4 8 12 16 24 28 32 LOCATION - Pali Chowk Rd, Bhayandar, Dongri, Uttan, Mumbai, Maharashtra 401106 AREA OF PLOT 63 SQ.M 2 A B C D E F G H J K L M N 1 2 3 4 5 6 7 8 9 10 11 12 8700 5435 6800 12515 8400 5400 D1 D2 3500 16001400 4900 1600 600 1480 550 1450 3050 1900 15001500 3000 5000 3000 4900 1600 4900 1600 1500 1500 1900 3000 1500 3450 1500 40120 35305 53440 1488 1450 C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 C24 C25 C26 C27 C28 C29 C30 C32 C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46 C47 C49 C50 C52 C51 C53 C54 C56 C55 C57 C58 O P Q R S T 3 A A' A B C D E F G H J K L M N O 1 2 3 4 5 6 7 8 9 10 11 12 P 3500 16001400 4900 1600 600 1480 550 1450 3050 1900 15001500 3000 5000 3000 4900 1600 4900 1600 1500 1500 1900 3000 1500 Q 3450 1500 1488 1450 R S C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 C24 C25 C26 C27 C28 C29 C30 C32 C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46 C47 C49 C50 C52 C51 C53 C54 C56 C55 C57 C58 S1 S3 S2 S4 P1 P2 P3 P5 P4 P6 P7 P8 P9 P10 P19 P36 P55 P18 P20 P21 P22 P23 P24 P25 P11 P12 P13 P14 P15 P16 P17 P26 P27 P28 P29 P30 P31 P32 P33 P34 P44 P35 P37 P38 P39 P40 P41 P42 P43 P45 P46 P47 P49 P50 P51 P52 P53 P54 P56 P57 P58 P59 P60 P61 P62 P63 P64 P65 P66 P67 P68 P70 P69 P71 P75 P72 P73 P74 P75 P76 P77 P78 P79 P80 P81 P82 P83 P83 P84 P85 P86 P87 P89 P90 P91 UP LOBBY GREEN ROOM LOBBY DOWN CONTROL ROOM LOBBY LV @0M LV @0.9M UP DOWN STAGE BACK STAGE LV @-1.35M TICKET COUNTER UP LV @0M A A' VIP ROOM A B C D E F G H J K L M N O 1 2 3 4 5 6 7 8 9 10 11 12 P 3500 16001400 4900 1600 600 1480 550 1450 3050 1900 15001500 3000 5000 3000 4900 1600 4900 1600 1500 1500 1900 3000 1500 Q 3450 1500 1488 1450 R S C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 C24 C25 C26 C27 C28 C29 C30 C32 C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46 C47 C49 C50 C52 C51 C53 C54 C56 C55 C57 C58 450 5400 1135 1385 1260 1475 1330 1385 1385 1500 450 5410 842 2000 852 1872 330 2050 3000 3400 1030 900 1050 915 1200 900 1045 810 620 580530 1820 3300 1010 840 1175 1235 590 590 5900 1000 1405 1305 4900 950 1340 1340 1460 400 1200 1190 1345 1177 900 900 1205 1405 1200 5000 7970 D1 D1 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D3 D3 D3 D3 D3 D3 D3 D3 UP LOBBY GREEN ROOM LOBBY DOWN CONTROL ROOM LOBBY LV @0M LV @0.9M UP DOWN STAGE BACK STAGE LV @-1.35M TICKET COUNTER UP LV @0M A A' VIP ROOM A B C D E F G H J K L M O 1 2 3 4 5 6 7 8 9 10 11 12 P 3500 16001400 4900 1600 600 1480 550 1450 3050 1900 15001500 3000 5000 3000 4900 1600 4900 1600 1500 1500 1900 3000 1500 Q 3450 1500 1488 1450 R S C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 C24 C25 C26 C27 C28 C29 C30 C32 C33 C34 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46 C47 C49 C50 C52 C51 C53 C54 C56 C55 C57 C58 450 5400 1135 1385 1260 1475 1330 1385 1385 1500 450 5410 842 2000 852 1872 330 2050 3000 3400 1030 900 1050 915 1200 900 1045 810 620 580530 1820 3300 1010 840 1175 1235 590 590 5900 1000 1405 1305 4900 950 1340 1340 1460 400 1200 1190 1345 1177 900 900 1205 1405 1200 5000 7970 D1 D1 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D3 D3 D3 D3 D3 D3 D3 D3
LOCATION PLAN, UTTAN CENTRE LINE PLAN FOUNDATION PLAN GF PLAN, AUDITORIUM
MATERIAL AREA ABSORPTION COEFFICIENT ABS DISCRIPTION SIDE WALL BACK WALL FLOORING CEILING AUDITORIUM SEATS 0.50 0.17 0.03 0.9 0.49 0.64 19.2 290.81 REVERBERATION TIME 1.01 seconds MATERIAL AREA ABSORPTION COEFFICIENT ABS DISCRIPTION SIDE WALL BACK WALL FLOORING CEILING AUDITORIUM SEATS 0.50 0.17 0.03 0.9 0.49 272.81 REVERBERATION TIME 1.08 seconds EMPTY AUDITORIUM HALF EMPTY AUDITORIUM 0.04 MATERIAL AREA ABSORPTION COEFFICIENT ABS DISCRIPTION SIDE WALL BACK WALL FLOORING CEILING AUDITORIUM SEATS THICK CARPET 0.25 154.5 184.5 REFLECTIVE PANEL OF PLYWOOD 0.17 ABSORPTIVE REFLECTIVE 135.5 (VELVET CURTAINS) (TIMBER PANEL) 0.13 0.13 0.39 135.5 TIMBER PANEL 105.45 FABRIC CISHION 0.03 30 52.84 17.6 94.9 38.6 31.36 0.09 A= 52.84+17.6+94.9+38.6+31.36+0.9 271.7 RT (0.16*V)/A WHERE, RT= Reverberation time V= volume A = summation of ABS unit V OF HOUSE= 1852.7 CU.M REVERBERATION TIME FULL AUDITORIUM 1.09 seconds 154.5 184.5 135.5 135.5 105.45 30 154.5 184.5 135.5 135.5 105.45 30 A= 52.84+17.6+94.9+38.6+31.36+19.2 RT (0.16*V)/A WHERE, RT= Reverberation time V= volume A = summation of ABS unit V OF HOUSE= 1852.7 CU.M 52.84 17.6 94.9 38.6 31.36 1.2 52.84 17.6 94.9 38.6 31.36 A= 52.84+17.6+94.9+38.6+31.36+1.2 RT (0.16*V)/A WHERE, RT= Reverberation time V= volume A = summation of ABS unit V OF HOUSE= 1852.7 CU.M B8 E6 H8 J7 L8 N8 O8 P8 Q8 R8 S8 A8 T6 +3000 +9500 +12500 +15500 7 +3000 +9500 +12500 +15500 O12 N11 N9 N8 M4 M2 A8 N5 THICK CARPET REFLECTIVE PANEL OF PLYWOOD ABSORPTIVE REFLECTIVE (VELVET CURTAINS) TIMBER PANEL FABRIC CISHION THICK CARPET REFLECTIVE PANEL OF PLYWOOD ABSORPTIVE REFLECTIVE (VELVET CURTAINS) TIMBER PANEL FABRIC CISHION 8 C42 C43 UP DOWN LV @3M AV ROOM LIGHTING ROOM LV @3M A B C D E F G H J K L M N O 1 2 3 4 5 6 7 8 9 10 11 12 P 3500 16001400 4900 1600 600 1480 550 1450 3050 1900 15001500 3000 5000 3000 4900 1600 4900 1600 1500 1500 1900 3000 1500 Q 3450 1500 1488 1450 R S C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 C24 C25 C26 C27 C28 C29 C30 C32 C33 C34 C35 C36 C37 C38 C39 C40 C41 C44 C45 C46 C47 C49 C50 C52 C51 C53 C54 C56 C55 C57 C58 A5 B3 C1 G1 D4 E5 F3 H8 I4 J10 K2 L5 M2 N2 O2 P5 Q3 R5 S5 G1 O2 Q3 Q4 T5 T6 E7 S8 R9 J10 R11 R12 EAST ELEVATION SCALE - 1:100 NORTH ELEVATION SCALE - 1:100 +3000 +9500 +12500 +15500 +13500 +10500 +4000 +1000 +3000 +9500 +12500 +15500 +13500 +10500 +4000 +1000 +0 +0 C42 C43 UP DOWN LV @3M AV ROOM LIGHTING ROOM LV @3M A B C D E F G H J K L M N O 1 2 3 4 5 6 7 8 9 10 11 12 P 3500 16001400 4900 1600 600 1480 550 1450 3050 1900 15001500 3000 5000 3000 4900 1600 4900 1600 1500 1500 1900 3000 1500 Q 3450 1500 1488 1450 R S C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 C24 C25 C26 C27 C28 C29 C30 C32 C33 C34 C35 C36 C37 C38 C39 C40 C41 C44 C45 C46 C47 C49 C50 C52 C51 C53 C54 C56 C55 C57 C58 SB4 SB10 SB11 SB14 SB16 SECTION AA’ SECTION BB’ REFLECTED CEILING PLAN NORTH ELEVATION EAST ELEVATION ELECTRICITY LAYOUT SECOND FLOOR PLAN
11 UP LOBBY GREEN ROOM LOBBY DOWN CONTROL ROOM LOBBY LV @0M LV @0.9M UP DOWN STAGE BACK STAGE LV @-1.35M TICKET COUNTER UP LV @0M A A' VIP ROOM A B C D E F G H J K L M N O 1 2 3 4 5 6 7 8 9 10 11 12 P 3500 16001400 4900 1600 600 1480 550 1450 3050 1900 15001500 3000 5000 3000 4900 1600 4900 1600 1500 1500 1900 3000 1500 Q 3450 1500 1488 1450 R S C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 C24 C25 C26 C27 C28 C29 C30 C32 C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46 C47 C49 C50 C52 C51 C53 C54 C56 C55 C57 C58 450 5400 1135 1385 1260 1475 1330 1385 1385 1500 450 5410 1045 2000 852 1872 330 2050 3000 3400 1030 900 1050 915 1200 900 1045 810 620 580530 1820 3300 1010 840 1175 1235 590 590 1000 1405 1305 4900 950 1340 1340 1460 400 1200 1190 1345 1177 900 900 1205 1405 1200 5000 7970 D1 D1 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D3 D3 D3 D3 D3 D3 D3 D3 SB17 SB18 SB19 SB21 12 SWITCHBOARD SCHEDULE SWITCHBOARD SPACE SERIES COLOUR CEILING FAN (CF) PANEL LIGHT (PL) FLOOD LIGHT (FL) LED LIGHT (LL) SPOT LIGHT (SL) TUBELIGHT (TL) UCL LIGHT (UL) SB1 LIGHTING SPACE SERIES 1 CF2 LL3, LL4 SB2 CLASS ROOM SERIES 2 CF3 LL5, LL6 SB3 COMPUTER ROOM SERIES 3 CF4 LL7, LL8 SB4 AV ROOM SERIES 4 CF6 LL9, LL10 SB5 CONTROL ROOM SERIES 5 LL14, LL15 SB6 ADMIN OFFICE SERIES 6 CF5 LL12, LL13 SB7 BACKSTAGE SERIES 7 TL1, TL2 SB8 AUDITORIUM SERIES 8 CF8 FL7, FL8, FL9, FL10, FL11, FL12 SB9 AUDITORIUM SERIES 9 CF10, CF12, CF14 PL11, PL12 TL9, TL10 SB10 AUDITORIUM SERIES 10 CF7 FL1, FL2, FL3, FL4, FL5, FL6 SB11 AUDITORIUM SERIES 11 CF9, CF11, CF13 PL1, PL2 TL3, TL4 SB12 AUDITORIUM SERIES 12 CF16, FL18, FL20 PL13, PL14, PL15 TL7, TL8 SB14 AUDITORIUM SERIES 14 CF15, CF17, CF19 PL3, PL4, PL5 TL5, TL6 SB15 STAGE SERIES 15 SL1, SL2, SL3, SL4, SL5 SB16 AUDITORIUM SERIES 16 PL6, PL7, PL8, PL9, PL10 SB17 STORAGE SPACE SERIES 17 LL19 SB18 GREEN ROOM SERIES 18 CF21 LL16, LL17 SB19 TICKET COUNTER SERIES 19 UL12, UL13 SB20 WC LOBBY SERIES 20 LL18 UL1-11 SB21 PORCH SERIES 21 LL19, LL20 ELECTRICITY APPLIANCES SCHEDULE SYMBOL APPLIANCES QUANTITY COMPANY SPECIFICATIONS SIZE COLOUR HEIGHT FROM THE FLOOR FINISH •••••••••••••••••••••••••••••••••••••••••••••••• RECESS 15 MURPHY LIGHTINGS TYPE LED SQUARE RECESS WATTAGE 12W LUMEN 1200 PF >0.95 150*150 OPAL WHITE LED SLIM FLOOD LIGHT 12 FORTUNEARRT TYPE LED SLIM FLOOD LIGHT WATTAGE : 100 W LUMEN OUTPUT >9800 LM MATERIAL : PRESURE DIE CAST ALUMINUM ENCLOSURE 300 * 300 NATURAL WHITE LED UCL LIGHT 21 MURPHY LIGHTINGS TYPE LED SQUARE RECESS WATTAGE 5W LUMEN 500 PF >0.95 DIA 170 MILKY WHITE HALOGEN SPOT LIGHT 5 METRO CINE LIGHTS TYPE HALOGEN SPOT LIGHT WITH GLASS & BOUNDOOR WATTAGE 5KW 300 * 250 * 250 WARM WHITE LD UCL LIGHT 13 VIPRO TYPE MLDL-UCL03 LED UCL LighT W ATTAGE 3W LUMEN 300 PF >0.95 DIA 115 YELLOW WHITE OMEGA LED TUBE LIGHT 8 MURPHY LIGHTINGS TYPE BATTEN MLFTL-BT20 WATTAGE 20W LUMINOUS 2000 PF >0.95 VOLTAGE 220-240V AC 600 COOL WHITE BAJAJ NEW BAHAR 3 BLADE CEILING FAN 20 BAJAJ TYPE BAJAJ NEW BAHAR 1200 MM 3 BLADE CEILING FAN MOTOR SPEED: 380 RPM BLADE SWEEP SIZE: 1200 MM POWER CONSUMPTION: 73 W DIA 1200 BROWN WC 1230.00 884.00 WC WC WC WC WC 20 MM THICK PLASTER 12 MM THICK PLASTER 75 MM VENT PIPE 600 600 MM VITRIFIED TILE 125 MM SOIL PIPE 75 MM WASTE PIPE WATER CLOSET WATER INLET WASH BASIN URINALS IC1 IC2 SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE 824.15 1170.00 2761.92 1530.00 1100.00 1965.14 715.00 600.08 660.00 HEAVY C.I. AIRTIGHT FRAME CAST IRON COVER OF IC 20 MM THICK PLASTER PVC PIPE OF DIA 280 MM 150 MM THICK PCC BENCHING HALF ROUND CHANNEL RUBBLE SOLING RAMMED EARTH MASONARY WALL THICK 170 MM 951.01 2000.00 546.08 300.00 524.49 1175.86 3000.00 340.25 363.51 900.00 IC3 HEAVY C.I. AIRTIGHT FRAME CAST IRON COVER OF IC 20 MM THICK PLASTER PVC PIPE OF DIA 280 MM 150 MM THICK PCC BENCHING HALF ROUND CHANNEL RUBBLE SOLING RAMMED EARTH MASONARY WALL THICK 170 MM INSPECTION CHAMBER HEAVY C.I. AIRTIGHT FRAME CAST IRON COVER OF IC 20 MM THICK PLASTER 150 MM THICK PCC RUBBLE SOLING RAMMED EARTH OUTLET LID DISCONNECTING CHAMBER START START 600*600 MM SUPER GLASSY KAJARIA TIILES CERAMIC WALL MOUNTED URINALTANKLESS OPAL WC BY JAQUAR IKEA AERATED MIXER TAP CERA HEALTH FAUCET PIPE KEMJO CERAMIC WALLHUNG BASIN START TOILET BLOCK PLAN A A' TRENCH DRAIN SYSTEM WATER PROOFING LAYER REINFORCEMENT CONCRETE WATER/FOOD PIT COPING METAL RAIN CHAIN PIPE REDUCER 20 MM SCREW METAL FASCIA METAL BOX GUTTER HIDDEN HANGER WITH U-BOLT GRATED C.I. COVER PEBBLES GRAVEL SAND PEBBLES GRAVEL MASONRY WALL 150 MM THICK PCC RUBBLE SOLING RAMMED EARTH 150 MM THICK PCC RUBBLE SOLING RAMMED EARTH PLINGTH BEAM CEMENT COBA FLOORING 150 MM PCC CONCRETE Platform LV300 WINDOW FRAME WINDOW GLASS MARBLE WALL HOLLOW METAL FRAME PERIMETER BASE CAULK GLAZING FACE STOP GASKET CAULK GLAZING CHANNEL GROOVE WASHER BOLT PERIMETER BASE HOLLOW METAL FRAME CONTROL KNOB RCC NUT - BOLT AND WASHER HOLLOW METAL FRAME NUT - BOLT AND WASHER GROOVE NUT BOLT AND WASHER WHEEL SKYLIGHT DETAIL WINDOW DETAIL ELECTRICITY LAYOUT GF PLAN
INNER CORE
URBAN DESIGN SEM 7 KOLHAPUR (GROUP WORK)
5
HORSE STABLE
6
IDS SEM 2 MURBAD GUIDE - SHANTANU KHANDKAR
HORSE STABLE
6
IDS SEM 2 MURBAD GUIDE - SHANTANU KHANDKAR
TECHNOLOGY STUDIO SEM 3 CAR PARKING -VIPUL NARESH MALI (2041)
NORTH ELEVATION EAST ELEVATION 2.9000 1.1250 1.0000 3.1150 2.1500 1.0000 2.5000 1.1150 2.2500 1.0000 RCC BEAM PARAPET WALL PARAPET WALL TERRACOTTA SHEETS ROOF FOR RAMP IRON JALI WITH STELL FRAME RETRACTABLE IRON GATE WOODEN PLATES WOODEN LOUVERS GROUND FLOOR PLAN LV 1.7 N 0.70 1.60 0.50 1.21 1.40 1.20 3.00 4.44 3.80 8.12 1.91 4.89 1.87 4.26 0.23 14.94 14.94 6.98 8.35 1.74 3.28 1.48 1.68 1.40 3.28 3.00 3.80 3.80 14.94 14.94 6.98 4.00 1.74 1.24 2.18 2.25 2.70 2.96 1.10 1.35 8.12 FIRST FLOOR PLAN N Mahindra Thar 2021 Chevy Camaro - Silver 1975 Fiat Light Blue VW Beetle 1982 bright Yellow LADIES WC SHOWER GENTS URINALS, WC & SHOWER ENTRANCE ENTRY TO RAMP RAMP ENTRY TO FIRST FLOOR RAMP DOUBLY LOADED DUCT SKYLIGHT SKYLIGHT LANDING LANDING LANDING LANDING LANDING LANDING LV LV 0 LV LV 1.25 LV 1.85 LV LANDING LANDING LV 1.25 LV 1.85 LV 3 LV 3 1.40 3.28 3.80 3.80 6.98 ROOF PLAN N ROOF OVER RAMP DOUBLY LOADED DUCT SKYLIGHT SKYLIGHT LANDING LANDING LV LV 2.25 LV 2.85 LV LANDING 1.74 LANDING ROOF OVER RAMP ROOF OVER RAMP 8.58 3.23 13.60 A B B' 3.00 2.00 0.50 0.25 1.00 1.23 0.80 3.00 13.60 C' C' A' B' C' 1.80 1.21 1.56 2.19 2.00 0.97 RETRACTABLE IRON GATE TERRACOTTA TUBES VAULTED R00F PARAPET WALL SLIDING DOOR SECTION AA' SECTION BB' (WITHOUT FACADE) 3.12 1.00 8.12 2.50 0.90 2.34 3.08 2.00 2.29 0.83 1.25 1.00 1.00 1.00 3.50 3.50 SECTION CC' HARD LAND RUBBLE STONE MORTAR KOTA TILES CONTINUOUS STRIP FOOTING ISOLATED PAD FOOTING RCC BEAM TERRACOTTA SHEET ROOF RETRACTABLE IRON GATE STEEL TRUSS FRAME IRON JALI WITH STELL FRAME 1.00 0.03 0.05 0.12 0.25 1.0000 1.0000 13.5033 3.0000 1.5000 1.0021 TERRACOTTA TUBES VAULTED R00F PARAPET WALL STEEL PIPE PARAPET WALL TERRACOTTA SHEETS ROOF 1.0000 2.5000 3.0000 PARAPET WALL OPEN TERRACE 1.3990 1.0000 CEMENT JALI WEATHER COURSE HOLLOW TERRACOTTA TUBES STEEL FRAME FOR GLASS PANELS IRON MEMBER LOAD BEARING WALL ROOF DETAILS HINDGE WOODEN FRAME WOODEN FRAME WOODEN PLATES WOODEN LOUVERS EAST AND WEST FACADE DETAILS MOVER 3.55 9.41 0.45 0.2510 WOODEN FINS WITH JALI STEEL TRUSS GAP IN BETWEEN PIVOT PIVOT WOODEN FINS WITH JALI STEEL TRUSS SOUTH FACADE DETAILS
4.48 GROUND FLOOR PLAN @1.7M FIRST FLOOR PLAN ROOF PLAN @1.7M SECTION AA’ SECTION BB’ EAST ELEVATION NORTH ELEVATION SECTION CC’ EAST AND WEST FACADE DETAILS SOUTH FACADE DETAILS ROOF DETAILS 7
TECH SEM 3 MURBAD GUIDE - DHARMESH MEWADA CAR PARKING
AD SEM 3 MURBAD GUIDE - RUTIKA PARULKAR
8
TO DIG
REPRESENTING THE SACRED!
AD SEM 6 STUDY TRIP CHIDAMBARAM (WHOLE CLASS WORK)
9
REPRESENTING THE SACRED!
AD SEM 6 STUDY TRIP CHIDAMBARAM (WHOLE CLASS WORK)
9
26 WAYS OF SEEING BHOPAL
LANDSCAPE SEM 5 STUDY TRIP BHOPAL (3 PEOPLE)
10
DRAWING AS A BUILDING
TECH SEM 4 SIDHPUR PATIYALA (GROUP WORK)
11
ORNAMENTATION IS A CRIME !
ELECTIVE SEM 1 JALIYANWALABAG GUIDE - AISHWARYA PADMANABHAN (GROUP WORK)
12
RAILWAY ARCHITECTURE 14
ELECTIVE SEM 3 INDIA GUIDE - AISHWARYA PADMANABHAN (GROUP WORK)
URBAN SPACES
ELECTIVE SEM 5 KHOTACHIWADI GUIDE - AINDRE BAPTISTA (GROUP WORK)
13
BUILDING ANALYSIS 15 BUILDING ANALYSIS
TECTONICS SEM 4 GUIDE : RUTIKA PARULKAR (2 PEOPLE)
15
CASA WABI HOUSE BY TADAO ANDO
AD SEM 1 EXPRESSION THROUGH STORY 16
MODEL MAKING AND EXPLORATION
SUMMER INTERNSIHP SEM 4 VISITING FACULTY AND ARCHITECT - ROHIT KUDALE (4 PEOPLE)
VARANASI HOUSE HAND MODEL
DRESSING TABLE 1:1 DRAWING EXERCISE
17
MODEL MAKING AND EXPLORATION
9SUMMER INTERNSIHP SEM 4 VISITING FACULTY AND ARCHITECT - ROHIT KUDALE (2 PEOPLE)
DRESSING TABLE ITERATION MODEL EXPLORATION
17
IMAGINARY SCHOOL
INTRODUCTORY WORKSHOP SEM 1 (GROUP WORK)
PLATONIC PLAYGROUND
ALLIED SEM 4 GUIDE - GEORGE JACOB
18
19
GARDEN OF MEMORIES
ALLIED SEM 1 GUIDE - MISBAH AND SHIVANI
20
TENSIGRITY MODEL
ALLIED SEM 2 GUIDE : GEORGE JACOB
21
DIAGRAMMING PLAN ELEVATION ELEVATION
1:2 MODEL
1:6 MODEL
TENSIGRITY
1:1 MODEL
BRIDGE MODEL
EXPLORING STRUCTURE
22
TOS SEM 5 GUIDE - RAJITHA GOPINATHAN AND NEERAJ VAKHARIYA