Selected Work @ 2024

Page 1

Vishvanath Ghosh

PORT FOLIO Selected Work @ Gensler

2024

Vol 001


2011

2013

RKDS

2018

IDC

Present

Gensler

Prodapt HQ, Chennai, India Standard Chartered Bank, Mumbai, India

CIti Bank, Bangalore India 7 Eleven GDC Bangalore, India

BGE 1 Center Plaza Renovation, Baltimore Amazon BLR 26 & 27, Bangalore, India

ADP Hyderabad, India

JPMC Hyderabad, India

Wipro Campus. Kodathi B1 Tower

Novartis ABW, Hyderabad, India

Wipro CG HQ,Bangalore, India

Barclays LTS Facility Expansion Pune, Wipro Campus B2 & B3, Bangalore, India

Wipro Campus,Pune, India

ABC Co-working office

EXL- Corporate Office, Ahmadabad

Adidas Headquarter, Gurgaon

EXL- Corporate Office, Chennai SembCorp Ind HQ, Gurgaon

EXL- Corporate Office, Hyderabad

Lava mobile Factory, Noida *

EXL- Corporate Office, Bangalore

Inductotherm Factory, Ahmadabad *

DMI- Mobile Head Office, Noida

EXL- Corporate Office, Gurgaon

EXL- Corporate Office, Manila and Cebu, Philippines

Sapient, Gurgaon

Apeejay groups office, Delhi

Green Ply Head-office, Gurgaon

ISKON Temple, Mauritius *

Valvo –Eicher HQ,Gurgaon

Punjab National Bank HQ, New Delhi* Zuari garden city-township, Mandya*

Apeejay Corporate Headquarter, Kolkata*

Vishvanath Ghosh

Associate / Project architect Email : vishvghosh@gmail.com Mobile : +91 888 2464 753

I have credible design & build experience of 12 years, with strong focus on the functional design and technical realization of a broad range of project types, including corporate campuses, workplace, and retail.

I am a Project Architect and Associate at Gensler. I have worked on numerous large scale & complex projects in India & the overseas from all phases from Design to construction. I recognized for My specialization in space planing , interdisciplinary coordination, specialist consultant coordination and focus on final user experience. Prior to working with Gensler I was worked with Interices design consultant and Romi Khosla Design Studios where I have been involved in all stages of projects from conceptual designs until the final execution at site . I have leading on Key Global Client account and multiple projects in pan India.


belief

PURPOSE

I like to build to make , to create. I believe in reality yet thrive on possibilities.

VISION

I design solutions. Imagine alternatives. Rethink the givens and search for meaning.

MEANING

Design is my tool. Yet design is never my work , its fun .

CLARITY

I believe in rational I believe in logic, clarity and understanding.

DESIGN

I see Design as an exploration of strategies. I believe in intuition.


purpose Selected Work @ Gensler


Arena Adidas Hq, NCR I Gym Entry & Locker


Arena Adidas HQ, NCR Project Size : 1,00,000 Sqft Location : Delhi NCR, India Year Of Completion : 2016-17 Principal Designer : Gensler / Brain berry Local Architect : Interics Design Consultant. Role : Lead Architect

Starting on the project, Adidas expressed the need for a workplace that would enable their cultural aspirations - fitness, movement, collaboration, experimentation - where their talent became fearless and focused on winning. Our approach was to develop a workplace where every aspect was a big, bold idea or a movement: the program was transformational, the design aesthetic was dramatic, and every element was a celebration of the work and product. This was a workplace for a tribe of talented young minds, clad in Adidas apparel daily like a uniform, focused on doing things.

Selected Work @ Gensler


Arena Adidas Hq, NCR I Collaboration Area

The Retail office “We want the workplace to be ACTIVE! Integration of Sports into the office Is a key focus!”

“Need more storage! There’s samples, clothes and shoes all over the place. It also should be easy to access”

“It’s chaotic in the open workspace, especially when people take phonecalls - it is difficult to concentrate!”

“The new space should focus on the employee experience and comfort--simple comforts go a really long way!”


The end result is profound - the new workplace didn’t just change a single experience for the teams, it re-imagined their experience of work (focus, collaborate, socialize, learn, rejuvenate), it re-imagined their experience of play (fitness, recreation) and it re-imagined their experience of live (heath focused cafeteria, health programs, after hour gatherings, social events). Above all, with a clear focus on brand and core values, Adidas got a workplace they could truly call their own.

Program: 365 workstations

1 MD Cabin

14 enclosed workspace / team huddle rooms Open Collaboration

Focus Booths

Kitchen Hub Flex Meeting Rooms

0.6 seats : 1 workseat Integrated showroom + Brand experience center

Modular Kit of Parts B

A

File Storage

C

Collaboration

Selected Work @ Gensler

E

D

Apparel Rack

Brand Panel

F

Doorway

Footwear Store


Typical Floor Layout

Material Board

OSB Board

Concrete / Bison Board

Acoustical panel

Carpet

Color Back Glass

EGD


Selected Work @ Gensler


Arena Adidas Hq, NCR I Cabins & Meeting

The Glass Box


vision Selected Work @ Gensler


7 Eleven GSC, Bangalore I Reception Area


7 Eleven GSC,Bangalore Project Size : 80,000 Sqft Location : Banglore, India Year Of Completion : 2022-2023 Principal Designer : Gensler . Role : Project Architect

India’s first 7 Eleven office launched in the IT hub of India, Bangalore, with an aim to create an environment that exudes the brand’s customer obsession, going above and beyond to exceed expectations and provide an atmosphere of unparalleled enjoyment for its employees. Inspired by the brand’s latest advertising campaign tagline, “Take it to eleven,” the new workplace emphasizes an unwavering dedication to amplifying customers’ joy. Upon completion, the client expressed immense satisfaction and the new 7 Eleven office even went viral on the internet, garnering significant attention on LinkedIn. The unique and employee-centric design of the office resonated with the client’s vision and requirements and exceeded expectations..

Selected Work @ Gensler


7 Eleven GSC, Bangalore I Lift Lobby

Re-fuel

Material Expression

Architectural Expression

Connectivity


7 Eleven GSC, Bangalore I Central Stair

Selected Work @ Gensler


4200

LEVEL 06 16,800

LEVEL 05 12,600 MB600 IN ELEVATION

3910

4200

MB600

M600

M600

MC300 SUSPENDER

MB300

5

AXON - J-42 - STAIRCASE SCREEN SCALE:

LEVEL 04 8,400 MB600 IN ELEVATION

MB600

M600

M600

MC300 SUSPENDER

FIRE CURTAIN - SINGLE BARREL

4200

3910

FIRE CURTAIN - DOUBLE BARREL FIRE RATED GYPSUM CEILING FINISHED IN PAINT - BLACK AS PER APPROVAL.

MB300

LEVEL 03 4,200

ST RIN G

METAL MESH SCREEN J-42 AS PER DETAIL FINISHED IN POWDER COAT GREEN - MT-6A AS PER APPROVAL.

1200 TYP ER

BE AM

600 TYP

4200

00

3910

MC 3

MB600 IN ELEVATION

MB600

M600

M600

MC300 SUSPENDER

19MM THK LAMINATED GLASS FIXED WITH APPROVED BRACKETS AND COUNTER SUNK SCREWS

MB300 MC300 STRINGER BEAM

MC 3

00

ST RIN G

ER

STAIRCASE - TREAD AND RISER MADE OF METAL FOLDED STRUCTURE AND FINISHED IN MT02- RED POWDER COAT AS APPROVED.

40MM DIA SS HANDRIAL PVD COATED IN BLACK COLOR AT 900MM FROM FFL; TO BE FIXED ON THE BALUSTRADE AS PER MANUFACTURERS PROPREITARY DETAIL BE AM

GLASS FIXING BRACKETS AS PER MANUFACTURERS PROPREITARY DETAIL.

LEVEL 02 0


Work Area

Selected Work @ Gensler


7 Eleven GSC, Bangalore I Work Area


Social Hub

Selected Work @ Gensler


7 Eleven GSC, Bangalore I Social Hub


Selected Work @ Gensler


meaning


ADP HQ, Hyderabad Project Size : 4,00,000 Sqft Location : Hydrabad, India Year Of Completion : 2020-2022 Principal Designer : Gensler I Subhashis Mandol Role : Project Architect I Designer

“The ADP CAMPUS translates the values of the brand, through interwoven Layers of design, planning, and program.The visuals and journeys across the Building culminate these ideas into a holistic experience that is infused with local culture and the universal ADP” The design brief endeavors to encapsulate the brand’s core essence as a sports and fitness powerhouse, necessitating a layout that incorporates open desking arrangements alongside abundant collaboration spaces. Gensler, the esteemed architectural firm, conceived the notion of a playground as the overarching interior concept, artfully fusing elements of an urban cityscape with a sports-inspired aesthetic. The judicious selection of materials, such as exposed concrete, metallic cages, and wooden OCB boards, imbues the interior space with a wealth of character and charm. Selected Work @ Gensler


ADP Hyderabad I Executive Lounge

Integrity & Innovation

Social Responsibility

People Matter


HEAT&EAT THE PRIVATE DINING ALLOWS PANTRY STATION

ACCENT PILLARS IN LOCATIONS AS PART OF THE SCHEME

FOR THE FOCAL SPACE ON THE EAST SIDE AND IS DESIGNED AS A PATIO SITOUT THE MAIN ENTRY AREA BECOMES AN ARRIVAL WITH GRAPHIC BACKDROPS, INSTALLATIONS, SIGNAGE , MENU WALLS AND ALSO SETS THE CONTEXT OF THE THEME

THE FOCAL WALLS POINTS

KIOSKS/MENUS CLUSTER

FOCAL KITCHENS

LOCATIONS OF KITCHENS FRAME THE SITOUT AREAS WHICH ARE KEPT NEUTRAL TO FOCUS ON THE MAIN DESTINATIONS IN THE PLANNING

CENTRAL LOCATION DESIGNED TO GIVE A OPEN MARKET FEEL BECOMES A FOCAL POINT IN THE EAST WEST SPINE OVERALL SPACES NEAR THE FAÇADE ARE KEPT IN NEUTRAL DESIGN TO ACCENT THE INBUILT SPACES

Selected Work @ Gensler

THE FOCAL WALLS POINTS

FOCAL KITCHENS


RESPONSIBILITY/ SUSTAINABILITY / COMMUNITY IMPACTeach f&b hub celebrates how the company works with these key values and showcase projects/ selections/local materials

LOCAL CULTURE - each f&b hub celebrates how the company works with these key values and showcase projects/ selections/local materials/ menus…The local of the global .

PEOPLE MATTER- each recreation zone allows for different these hub locations become the focus of the showcasing , client stories, company milestone walls, visuals of projects which become references to the associates.”


Selected Work @ Gensler


ADP Hyderabad I Board Room -16 Pax

Boardroom


Selected Work @ Gensler


ADP Hyderabad I Cafeteria

Bazaar


Selected Work @ Gensler


clarity


Amazon, BLR 26&27 Project Size : 9,00,000 Sqft Location : Banglore, India Year Of Completion: 2021-22 Principal Designer : Gensler I Chirag Thakkar Role : Project Architect

“Creating a workspace that extends from the spirit of the campus in its celebration of inside - outside and bringing a strong focus to nature and its spirit to the design. Inspirations in the design amalgamate the contemporary, biophilia and sustainability.” The client was impressed with the architecture design of the Embassy Campus and adding values to the architecture design they reached out to us. Since we were the designers so they awarded the workspace to us. This marked our first project in the history of Gensler Bangalore where we were the Design Consultants for Architecture and Interiors for a single Client.

Selected Work @ Gensler


Amazon BLR 26 I Prefunction Area

URBANSCAPE ATTRIBUTES

NATURE SCAPE ATTRIBUTES

MATERIAL


1095

1520

1520

100X50 MM BOX SECTION FRAMEWORK; TYPICAL

195

1520

100X50 MM BOX SECTION FRAMEWORK; TYPICAL

195

100X50 MM BOX SECTION FRAMEWORK; TYPICAL

195

EXISTING SLAB

EXISTING SLAB

EXISTING SLAB 19MM THICK FLUTED PANEL 12MM PLYWOOD BACKING TO HOLD THE FLUTED PANEL

T-PROFILE SECTION VIBRATION DAMPERS AROUND THE DUCT PENETRATION

900

DUCT SIZE AS PER HVAC DWG

400

DUCT SIZE AS PER HVAC DWG

400

DUCT SIZE AS PER HVAC DWG

400

900

DUCT SIZE AS PER HVAC DWG

DUCT SIZE AS PER HVAC DWG

DUCT SIZE AS PER HVAC DWG

VIBRATION DAMPERS AROUND THE DUCT PENETRATION

VIBRATION DAMPERS AROUND THE DUCT PENETRATION

900

19MM THICK FLUTED PANEL RG-01 12MM PLYWOOD BACKING TO HOLD THE FLUTED PANEL

2400

2400

200

D 24 LIGHT AS PER APPROVED MAKE / FINISH

19MM THICK FLUTED PANEL RG-1

D23 A LIGHT AS PER APPROVED MAKE / FINISH

12MM PLYWOOD BACKING TO HOLD THE FLUTED PANEL

2400

2400

2900

TILL SLAB (AS PER SITE)

TILL SLAB (AS PER SITE)

PT-2

1495

TILL SLAB (AS PER SITE)

P-PROFILE SECTION

100

METAL TRIM

WALLPAPER AS PER FINISHING LAYOUT WP-2

AP-2 FB-1

450

19MM PLYWOOD BACKING 100x50 MM BLOCKING AS REQUIRED

LT-2 450

BLOCKING AS REQUIRED

550 95

PLY BACKING AS REQUIRED

SKIRTING AS SCHEDULED

450

SKIRTING AS SCHEDULED

FLOOR FINISHES AS SCHEDULED. REFER TO FLOOR FINISH PLAN

FLOOR FINISHES AS SCHEDULED. REFER TO FLOOR FINISH PLAN

FFL

FSL

FFL

BLOCKING AS REQUIRED

PLY BACKING AS REQUIRED

150

FLOOR FINISHES AS SCHEDULED. REFER TO FLOOR FINISH PLAN

FSL

19MM PLYWOOD BACKING

POWER SOCKET

SKIRTING AS SCHEDULED

EXISTING SLAB

FFL

FSL

EXISTING SLAB

EXISTING SLAB

03 SECTION @ CLOSED BOOTH SEATING SCALE: 1 : 10

Selected Work @ Gensler

300

300

1520

NOTE: PARTITION WALLS MUST BE FROM FLOOR TO STRUCTURAL SLAB

NOTE: PARTITION WALLS MUST BE FROM FLOOR TO STRUCTURAL SLAB

02 SECTION @ BANQUETTE SCALE: 1 : 10

NOTE: PARTITION WALLS MUST BE FROM FLOOR TO STRUCTURAL SLAB

01 SECTION @ WALL SCALE: 1 : 10


Exported by vishvanath_ghosh@gensler.com, Jun 3, 2022, 4:21:05 PM IST

Report Summary Summary by Status Priority 1

Priority 2

Priority 3

Completed

Verified

No status

47

0

0

0

0

0 Total Field Notes: 47

Summary by Tags* Tag: Architectural

2nd June 2020

Amazon | Global Real Estate & Facilities | India (BL… Field Note Photo

Overall Map View

Floor

Field Note Location

7. Sixth Floor

Created by

Vishvanath Ghosh

Created on

March 3, 2022

Due date

March 10, 2022

Status Tags Description

BACK TO THUMBNAILS

Priority 2 Architectural, Civil, Electrical, General Continued on next page

VIEW FIELD NOTE IN OPENSPACE →

Tag: Civil

Tag: Demolition

1

Priority 1

31

Priority 1

11

Priority 1

1

Priority 2

0

Priority 2

0

Priority 2

0

Priority 2

0

Priority 3

0

Priority 3

0

Priority 3

0

Priority 3

0

Completed

0

Completed

0

Completed

0

Completed

0

Verified

0

Verified

0

Verified

0

Verified

0

No status

0

No status

0

No status

0

No status

0

Total Field Notes

1

Total Field Notes

Total Field Notes

1

REPORT SUMMARY PAGE 1 OF 2

Exported by sid_majumdar@gensler.com, Mar 4, 2022, 3:46:47 PM IST

Tag: C&I Vendor

Priority 1

31

Total Field Notes

11

*Field Notes with multiple tags will be counted more than once


Work Cafe

Selected Work @ Gensler


Amazon BLR 26 I Work cafe


Cafeteria

Selected Work @ Gensler


Amazon BLR 26 I Cafeteria


design Selected Work @ Gensler


SCB Mumbai I Entry area #3D Render Revit + Enscape


SCB 90 MG, Mumbai Project Size : 46,000 Sqft Location : Mumbai, India Year Of Completion : 2023 Principal Designer : Gensler I Chirag Thakkar Role : Project Architect

The Standard Chartered Bank building at 90 MG Road is a significant part of a UNESCO World Heritage site. It was constructed in 1868 by architects Scott & McClelland and was originally known as the ANZ Grindlays Bank. The construction of this building took place shortly after the collapse of the “Cotton Boom,” a period when many companies faced bankruptcy. The architects designed this building in the Neo-Classical style, featuring a pediment facade adorned with six Corinthian columns. The exterior materials used include buff basalt and Porbandar Limestone. In terms of design philosophy, the goal is to preserve the architectural integrity of the building with minimal intervention. The approach is to create open fit outs in line with Standard Chartered Bank’s requirements and centralize meeting rooms and phone booths using simple materials that seamlessly blend with the overall space. To manage heat load and reduce long-term power consumption, underraised floor cooling has been implemented. The arrival space, characterized by double-height ceilings, offers a grand experience, and biophilic elements have been incorporated to enhance workplace wellness. This approach demonstrates a thoughtful balance between preserving the historical and architectural significance of the building while meeting the contemporary needs and sustainability goals. Selected Work @ Gensler


SCB Mumbai I Work Cafe #3D Render Revit + Enscape

ORNAMENTAL | MINIMAL

IMPOSING | MODEST

COLOSSAL | HUMANIZE


Arrival Area

Selected Work @ Gensler


SCB Mumbai I Arrival Area #3D Render Revit + Enscape


COVE LIGHTING FIXTURE AS PER SPECIFICATION

CONTINUOUS ACOUSTIC SEALANT

25MM THICK PRELAM BOARD

90 Mu

25MM THICK PRELAM BOARD(PERFORATED)

2 x12.5MM THK GYPSUM BOARD (KNAUF OR EQUIVALENT) ALL BOARDS TO BE STAGGERED AND PLASTERED SMOOTH NOTE: MATERIALS OF GYP BOARD TO BE RECYCLED MATERIALS

50MM THK 48KG/M3 ROCKWOOL TO WALL CAVITY

WALL FINISH ACOUSTIC PANEL AS PER SPECIFICATIONS

Inte

522 Ind Ban

Pro

WALL FINISH ACOUSTIC PANEL AS PER SPECIFICATIONS

EDGE PROFILE 50X50 MS SECTION FOR FRAME WORK

50X50 MS SECTION FOR FRAME WORK

FALSE CEILING AS PER SCHEDULED CEILING, REFER TO RCP

FALSE CEILING FRAMING

2 x12.5MM THK GYPSUM BOARD (KNAUF OR EQUIVALENT) ALL BOARDS TO BE STAGGERED AND PLASTERED SMOOTH NOTE: MATERIALS OF GYP BOARD TO BE RECYCLED MATERIALS

Jon Con Lev Raj

ME

Cla S.N P&T Mum

Lig

ELCTRICAL/CABLE RACEWAY

FALSE CEILING LIGHTING FIXTURE

Min #38 Ham Vija Ben

LEE 50MM THK 48KG/M3 ROCKWOOL TO WALL CAVITY

WALL FINISH ACOUSTIC PANEL AS PER SPECIFICATIONS

30 M PERFORATIONS ADDED PRELAM BOARD

FALSE CEILING AS PER SCHEDULED CEILING, REFER TO RCP

50MM MS SECTION @ 600MM C/C

EN 126 T. N Tam

6/8/2023 2:16:49 PM

\\gensler.ad\Projects\70\70.7263.000\BIM\Building Model\Progress Models\Nilabhra\MEETING ROOM_SCB_3D DETAILS 1.rvt

MEETING ROOM CEILING ASSEMBLY DETAILS

S

50MM MS SECTION @ 600MM C/C

GLASS WALL

P RAISED FLOOR ( 300 MM RAISED FROM BASE BUILD)

S

FLOOR FINISHES AS SCHEDULED. REFER TO FLOOR FINISHES PLAN

P

7 EXISTING SLAB

D

SKIRTING AS SCHEDULED

M

S

MEETING ROOM STRUCTURE & FINISHES BURST-OUT DETAILS

1

MEETING ROOM STRUCTRUAL DETAILS

COMPLETED MEETING ROOM ASSEMBLY

D

C

I

SCALE:

©

Selected Work @ Gensler


SHEET NOTES EXISTING SLAB

CONTINUOUS ACOUSTIC SEALANT (HILTI 506 OR EQUIVALENT) 50X50 MS SECTION FOR FRAME WORK

90 MG Road, Fort, Mumbai, MH 400023

FCL

Interior Designer

CEILING LINE; AS PER SCHEDULED CEILING, REFER TO RCP

REFER RCP FOR CEILING LEVELS

50MM MS SECTION @ 600MM C/C

522/1 CMH Road, 2nd Floor Indiranagar 1st Stage Bangalore, 560 038

2 x12.5MM THK GYPSUM BOARD (KNAUF OR EQUIVALENT) ALL BOARDS TO BE STAGGERED AND PLASTERED SMOOTH NOTE: MATERIALS OF GYP BOARD TO BE RECYCLED MATERIALS

Tel +91 (80) 6708 2000 Fax +91 (80) 6708 2000

Project Management

50MM THK 48KG/M3 ROCKWOOL TO WALL CAVITY

Tel 08041182900 Jones Lang LaSalle Property Consultants(India) Private Ltd., Level 13 & 14, No. 5, Prestige Khoday, Raj Bhavan Road, Karnataka, India.

P1

50X50 MS SECTION FOR FRAME WORK

100

12.5MM THK. PLY BACKING TO FIX SKIRTING SKIRTING AS SCHEDULED

MEP Consulatant 100

CONTINUOUS ACOUSTIC SEALANT FLOOR FINISHES AS SCHEDULED. REFER TO FLOOR FINISHES PLAN

FFL

50MM MS SECTION

Clancy Global

2 x15MM THK GYPSUM BOARD

Mumbai, Maharashtra 400080

Tel +91 7387551340

+/- 300 MM

S.No, 1000, Devidayal Rd, E dhiraj.bhadane@clancy-global.com @ 600MM C/C Building reuse contributes to the fine urban grain of the neighborhood, P&T Staff Colony, Mulund West,

Heritage walkers linger longer here

Lighting Consulatant

50MM G.I FLOOR CHANNEL

Tel 91-22-24912557 Ministry of Light E Contact@illumania.com #38, 4th Cross Rd, Hampi Nagar, RPC Layout, Vijayanagar, Bengaluru, Karnataka 560104

FSL EXISTING SLAB

LEED Consulatant P1 - DOUBLE LAYER DRY WALL PARTITION

01 P1-DRY WALL PARTITION-100MM

EN 3 126, Habibullah Rd, T. Nagar, Chennai, Tamil Nadu 600017

SCALE: 1 : 5

EDEGE PROFILE 25MM THK PRELAM BOARD

R0

150

50MM MS SECTION

Tel +91 44 28344780 E info@en3online.com

Date

Description

09/05/2023

ISSUE FOR TENDER

CONVENTIONAL SYSTEM OF AIR DISTRIBUTION

150

FCL CEILING LINE; AS PER SCHEDULED CEILING, REFER TO RCP

REFER RCP FOR CEILING LEVELS

50MM MS SECTION @ 600MM C/C 2 x12.5MM THK GYPSUM BOARD (KNAUF OR EQUIVALENT) ALL BOARDS TO BE STAGGERED AND PLASTERED SMOOTH NOTE: MATERIALS OF GYP BOARD TO BE RECYCLED MATERIALS

Seal / Signature

50MM THK 48KG/M3 ROCKWOOL TO WALL CAVITY

ISSUED FOR TENDER

P2

50X50 MS SECTION FOR FRAME WORK 12.5MM THK. PLY BACKING TO FIX SKIRTING SKIRTING AS SCHEDULED

Project Name

100

CONTINUOUS ACOUSTIC SEALANT

SCB 90 MG Rd

UNDERFLOOR AIR DISTRIBUTION

FLOOR FINISHES AS SCHEDULED. REFER TO FLOOR FINISHES PLAN

FFL

50MM MS SECTION @ 600MM C/C 2 x15MM THK GYPSUM BOARD

+/- 300 MM

100

Project Number

70.7263.000

AN UNDERFLOOR AIR DISTRIBUTION SYSTEM Description

PARTITION TYPES AND DETAILS

FSL

50X50 MS SECTION FOR FRAME WORK EXISTING SLAB

P2 - DOUBLE LAYER DRY WALL PARTITION

02 P2-DRY WALL PARTITION-100MM

• • • • •

Maximize the floor- ceiling height byScale reducing bulky overhead ductwork Improve building life-cycle costs by making services easy to reconfigure 1:5 Drawn by Reduce energy use for cooling by working VBwith natural convection currents Checked by VG air closer to the occupant Improve occupant health by delivering fresh Improve thermal comfort by giving more control to occupants over their environment

I4.101

SCALE: 1 : 5

© 2023 Gensler


Vishvanath Ghosh

Email : vishvghosh@gmail.com Mobile : +91 888 2464 753

Selected Work @ Gensler

2024

Vol 001


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.