Sun-bamboo pavilion
If one does not fail at times, then one has not challenged himself” - Ferdinand Porsche
Cheekoti vivek
Architecture I Design portfolio
COMPETITIONS 1 2 3 4 5 6 7
SUN – BAMBOO PAVILION
PG NO: 3-4
Onsite executed
PREFABRICATED BAMBOO STRUCTURE
5
Group of 2
MAHABAMBOO DESIGN COMPETITION
6
STREET FURNITURE DESIGN
7
HOUSE 2.0 ( POST PANDEMIC HOUSE)
8
ARCHITERRAX: VISITOR CENTER DESIGN
9
MODEL MAKING COMPETITION
10
Group of 5
Group of 3
Group of 3
Academic work submitted for competition
Academic work submitted for competition
ACADEMIC WORK 1 2 3
AUTOMOBILE HEADQUARTERS
11-12
M&G RICERCHE RESEARCH LABORATORY
13 - 16
High rise design
Long span structure
FURNITURE OUTLET Industrial design
HAND MADE MODELS
4
From Year 2018 - 2020
17 - 18
19
This project is a winning entry. Stood second in position.
Sun – Bamboo pavilion
3
4
5
Team of 5 people : Ar. Vaibhavi Agarwal , Ar. Sheetal Choudhary
Students : Cheekoti vivek , Shreya Gaikwad , sejal lodha.
Project: Revitalizing the existing Kasbapeth park in pune by promoting bamboo
as a construction material. The 5 units: Amphitheatre on Nala , Watch tower, toilets , pavilion and Bridge were designed according to situation of park .
6
7
8
9
10
Automobile head quarters, Pune. A prominent Indian automobile company, which has its manufacturing plant in Pune wants to architect to design its headquarters for the entire wester region. The company through this headquarter wants to portray their philosophy and vision. The vision of this company was to “ Never follow” . This head quarters is very special in terms of its form and the structural system. The idea was to resemble the Prefabrication of cars ,how the different parts were created and Assembled at one point. The structure has alternating floorplates which are acting as box like structure and placed over top of each other. The steel truss were used as walls to transfer the Load of the building to the core and then to the foundation. All the floor plates are pushed 2 m inside from bottom to top such that whole structure is self standing with the help of center of gravity.
11
Elevation .
First floor plan.
Structural stability of the form.
Section showing load transfer to cores. .
4th floor plan.
Part section showing the longitudinal details of particular floor
0.5m 3m 1.5m
Typical cross sections of floor and the fabricated staircases connecting all the mezzanine floors from top to bottom.
Plan showing load transfer to cores
Roof plan.
12m 6m
12
LONG SPAN DESIGN M&G RICERCHE RESEARCH LABORATORY ITALY. The existing research laboratory has to be Redesigned with one of the constrains as floor plans should not be changed but the Roof of the structure has to be redesigned With new innovative materials and structural Systems.
13
80m
14
15
16
Furniture factory outlet, Pune. Construction drawings and detailing’s.
17
18
Hand made models – 2018 - 2021 Amphitheater made for mahabamboo competition
Watch tower made for mahabamboo competition
White cement model showing the great bath of Mohenjo-Daro.
Bamboo pavilion made in minimalistic Approach not to over power the adjacent Container cafe.
Tourist facilitation center in in bhuj Gujarat.
Container house – Hobby spaces acting as the leisure and personal space for each individuals.
Kindergarten design.
19
20
Achievements.
Thank you Cheekoti vivek Ph no: 9381582905 Email id : cheekotivivek2021@gmail.com Instagram Id : Cheekoti vivek
Long span design
21