VLK Stadium Experience

Page 1

STADIUM EXPERIENCE



DESIGNED TO MEET

YOUR PROJECT’S FULL POTENTIAL HISTORY OF VLK ARCHITECTS Driven by innovation, purpose, and design excellence, VLK Architects is a multidisciplinary architecture firm whose practice areas include Commercial, Municipal, Education, and Automotive market sectors. With over 37 years of experience and a robust team of architects and supporting staff, VLK has the size and experience to service clients and projects of any size. Our business and project delivery processes have been recognized regionally and nationally multiple times, including Zweig Group; Building Design + Construction’s Annual Giants 300 Report; and by Architectural Record as a Top 300 Architecture Firm. Our development and commercial clients experience designs that are influenced and informed by extensive regional, national, and international experience. With offices in Austin, Dallas, Fort Worth, Houston, and San Antonio, we have formulated deep community roots, experiences, and relationships in all of the major metropolitan areas and sub-markets of Texas.

VLK MISSION We guide clients through process, collaboration and imagination to realize exceptional environments to work, live, learn and play.


VLK Architects | Experience

Katy ISD Legacy Stadium - in Association with HKS

Project Information Year Built: 2017 Project Size 12,000 seat capacity 6,000 sf press box Cost: $61,758,334

4

VLK Architects, Inc.

Legacy Stadium offers a venue for more than just football. The multipurpose facility includes a two-story press box, training rooms, and a 12,000 sf field house with spaces for police officers, paramedics and coaches. An elevated concourse allows spectators to see the field while waiting in line for concessions and a limited-access loop around the stadium provides for easy drop-off and pickup.


VLK Architects | Experience

Stadium Experience

5


VLK Architects | Experience

Hutto ISD Memorial Stadium Improvements

Project Information Year Built: 2021 Project Size 800 sf field storage 3,600 sf concessions 5,500 sf pressbox 10,000 seat capacity

6

VLK Architects, Inc.

Hutto Memorial Stadium Improvements to provide for seating capacity of 10,000 including new visitors field house, new concession and restroom facilities for home and visitors side, renovated scoreboard, new multi-level press box with filming deck, and site improvements to support these facilities.


VLK Architects | Experience

Scan me!

Learn About the Hutto Stadium Renovations

Stadium Experience

7


VLK Architects | Experience

Crowley ISD New Central District Stadium

Project Information Year Built: 2022 Project Size 8,000 seat capacity Cost $52,000,000

8

VLK Architects, Inc.

The CISD Sports Complex will build on the established traditions of CISD and addresses the need for a facility that provides for current programs and future program needs. The new CISD Sports Complex facility will be one of the three planned facilities on the Risinger Tract that will serve Crowley ISD community. The CISD Sports Complex is currently a finalist for the NCS4 Golden Eagle Award


VLK Architects | Experience

Scan me!

Learn About the Crowley Stadium!

Stadium Experience

9


VLK Architects | Experience

Eagle-Mountain Saginaw ISD Pioneer Stadium Renovations

Project Information Year Built: 7,500 seat capacity

10

VLK Architects, Inc.

The Boswell High School Stadium Additions and Renovations include a new addition to provide football and gymnastics locker rooms, a training room, weight room, and an indoor practice field. The renovations include a pressbox replacement, as well as the addition of a home side parking lot, and new landscaping, a home side grandstand expansion, visitor grandstand replacement, new visitor bus parking, new perimeter fencing for safety and security, and the replacement of visitors' restrooms to serve the auxiliary field.


VLK Architects | Experience

Stadium Experience

11


VLK Architects | Experience

Denton ISD Carrico Athletic Complex

Project Information Year Built: est. 2022 Project Size 7,000 seat capacity 9,700 sf press box Cost: $55,000,000

12

VLK Architects, Inc.

The Carrico Athletic Complex makes good on a promise Denton ISD made to the Carrico family for a multipurpose facility that honors the tradition of Denton ISD. Serving all four district high schools, the Carrico Athletic complex includes 7,000 seat capacity, with a horizontal one story press box and intimate seating. Grandstands were purposely lowered and extended to the edges of the end zones so all seats are as close to the action as possible. Two large video boards keep the spectators engaged in the play on the field and both home and visitor locker rooms stage the athletes before, during and after the game.


VLK Architects | Experience

Stadium Experience

13


VLK Architects | Experience

Denton ISD Bill Carrico Fieldhouse

Project Information Year Built: 2009

Braswell High School’s athletic program demanded a safe space for athletes. The district’s design called for new field houses that were both adjacent to the fields/ facilities where there athletes were training while providing separation of the male and female locker rooms. The common spaces were also designed to provide ease of access for all athletes including the indoor training facility with large windows to provide as much natural light as possible and creating coaches office and locker room spaces while maintaining proper coaching supervision among the athletes. Braswell High School has three field houses, one dedicated for football, one for soccer, track, and golf, and another for baseball, softball, and tennis. The football field house has dedicated locker rooms and meeting spaces for the varsity and sub-varsity teams, a state-of-the-art weight room, and a coach’s suite with locker rooms, offices, and conference space. The soccer, track, and golf field house includes locker rooms for each sport accessed from separate areas of the building for men and women. A centralized weight room and team meeting room work to both separate the locker room suites and provide access to any athlete. The training room for all athletes is located in this field house with access directly from the exterior. The baseball, softball, and tennis field house is separated into two buildings, one for the male athletes and one for the female athletes. The separation of the buildings creates a entry portal into the baseball/softball complex. Sustainable features were incorporated into the creation of the field houses, including adding polished concrete floors throughout the buildings, complete with the school colors and incorporating natural light into many spaces in the facility.

14

VLK Architects, Inc.


VLK Architects | Experience

Arlington ISD Martin High School Stadium Renovations

Project Information Year Built: Est. 2023

The new athletic stadium at Martin High School will include approximately 10,000 seats, a larger press box, locker rooms, restrooms and concessions. The design includes a landscape buffer between the stadium and neighboring homes and will utilize modern LED lighting that will be directed into the stadium onto the playing surface more efficiently with considerably less spillage from the venue and can be turned on and off quickly. The venue allows the district to host larger events and accommodate larger district crowds with easier access to locker rooms, restrooms and concessions. The design also features the ability to visually rebrand the stadium according to the school is using it. With lighting, signage and technology, the stadium will shift to reflect the home team for that event.

Stadium Experience

15


VLK Architects | Experience

Denton ISD C.H. Collins Athletic Complex

Project Information Year Built: 2004

16

VLK Architects, Inc.

The 12,000-seat stadium features a three-story press box in which the first floor is elevated above the top of the home stands and the mezzanine space under the press box provides covered seating. The third level of the press box has tiered seating for press, coaches, radio, a film deck, and two 20-person multiuse rooms. The complex has a scoreboard with a 10’ by 14’ video board with advertisement space. At the north end of the stadium, a two-story field house contains two large locker rooms and separate dressing areas for referees and female players on the lower level. The second level contains district athletic offices, a centralized storage, and an 150-person meeting room.


VLK Architects | Experience

Aledo ISD Bearcat Stadium

Project Information Year Built: 2006

The 8,000-seat, football, and soccer stadium features an 8-lane, all-weather urethane track and a synthetic turf field. A large, canopy-covered area is provided at the entrance to the stadium on the home side for vendors and booster clubs creating a carnival-type atmosphere. The space below the visitor stands is enclosed to provide storage for the facility, band, and drill team equipment. A concessions/ restroom building, located at the end of the home stands, houses the umpires’ dressing area for both the stadium and baseball/softball complex. A two-story press box contains tiered seating and provides spaces for announcers, press, radio, coaches, a film deck, and a multi-use room.

Stadium Experience

17


VLK Architects | Experience

Weatherford ISD Kangaroo Stadium

Project Information Year Built: 2009

18

VLK Architects, Inc.

VLK Architects proudly partnered with the district to design the renovations that bring seating capacity to 8,000 along with parking, concessions, and administrative areas to support the newly-expanded stadium. The second level of the press box houses self-contained areas for home coaches and visitor coaches as well as ample storage space. A media room and scout room share a lounge for catering, and open space on the second level allows for multiple uses throughout the year.


VLK Architects | Experience

Plano ISD Clark Stadium Renovations

Project Information Year Built: 2007

This project included the renovation and expansion of the existing two level press box at Clark Stadium. The previous 2,595 sf press box was expanded by 4,560 sf, including an elevator with an enclosed lobby at ground level. The new two-level press box included new MEP systems, finishes, glazing, and a cement plaster exterior designed to compliment existing concession buildings and restrooms.

Stadium Experience

19


VLK Architects | Experience

Eagle Mountain-Saginaw ISD Ranger Stadium

Project Information Year Built: 2012

20

VLK Architects, Inc.

Chisholm Trail High School is the district’s third high school, developed to serve the rapidly growing district. Athletic facilities include a competition stadium with an eight-lane track, 50,000 sf field house, a two-story press box, a competition and practice baseball/softball complex and an 800-seat minor competition stadium. Core facilities include a 1,000-seat auditorium, a 1,800-seat competition basketball and volleyball gymnasium and an agricultural facility. Sustainable elements, including a geothermal mechanical system, irrigation for the entire site via the water in the nearby lake and use of a drip irrigation system that saturates the ground from underneath, will generate cost savings for the district.


VLK Architects | Experience

Katy ISD Rhodes Stadium Renovations

HANDICAP PARKING

x

x

HANDICAP PARKING D

D

D

D

D

x

x

x

D

x

225,240 SQFT

177,150 SQFT CONCRETE

D

D

D

D

D

D

D

D

D

L

D

D

D

D

L

54,400 SQFT

265,850 SQFT

ASPHALT

ASPHALT

D

D

D

L

L

D

x

x

92,760 SQFT

ASPHALT

x

x

x

x

x

x

x

x

x

x

x

x

x

ASPHALT

05.20.2019

Project Information Year Built: 2021

VLK worked with Katy ISD to evaluate the parking lot capacities at Rhodes Stadium and developed a comprehensive plan for expansion to create two new lots and make updates to the existing parking areas.

Stadium Experience

21


VLK Architects | Experience

Brazosport ISD Brazoswood High School Fieldhouse

Project Information Year Built: 2022

In May 2019, voters passed a $267 million bond program which included the replacement of the 50-year old Brazoswood High School Main Campus, Fine Arts, CTE and Field House. The District has engaged VLK Architects and the design development for a new multi-sport field house has been completed. The new Brazoswood High School Multi-Sport facility is phase one of a four-phase, $150 million project. This facility will open Summer 2020 at which time the old field house will be demolished, making room on the existing site to begin construction of the new Brazoswood High School main campus. The new two-story facility will be located on the east side of Slade Field offering direct student access during and after school hours. Students and visitors will access the facility from an expanded parking lot off of Brazoswood Drive. The facility will serve over 1,000 high school students participating in athletics and locker rooms for football, softball, soccer, track, cross country, wrestling, and powerlifting. State of the art amenities includes a 9,000 square foot strength and conditioning weight room, prevention and rehabilitation athletic training and rehabilitation room, wrestling practice mat room, and a multi-use meeting room with direct access to a second-floor covered observation deck overlooking Slade Field.

22

VLK Architects, Inc.


VLK Architects | Experience

Keller ISD Timber Creek Stadium & Fieldhouse

Project Information Year Built: 2010

As part of the new Timber Creek High School, VLK designed new athletic facilities for the school. Athletic facilities included a new fieldhouse as well as a full 8-lane track and synthetic turf field for football and soccer.

Stadium Experience

23


Proposed Project Schedule

S

O

N

D

J

F

M

A

M

J

J

A

S

21 Days

Programming Meeting with Client/Stakeholders Program Revisions Program issued for Approval

34 Days

Site Analysis Collection of Site Data, Testing and Reports Meeting with consultants Evaluation of Site Constraints Preliminary site concepts

62 Days

Concept Design Creation of Prelim Bldg Massings Launch Session with Clients/Stakeholders Selection of Single Site/Bldg Concept Refinement of Concept Presentation to Clients Initial Cost estimate @ 30%

56 Days

Design Development Integration of Sustainable and High-Performance Design Selection of Materials, Systems and Finishes Preliminary Meeting with City of El Paso Permit Review Second Cost Estimate @ 50%

84 Days

Construction Documents Completion of progress set for pricing Third Cost estimate @ 95% Completion of Construction Docs Coordination of Consultant Docs Value Engineering (as needed)

42 Da

Bidding/Permitting Submission to all regulatory authorities Pre-Bid Conference Bid Opening Award of Bid Consideration of Alternates

Notice to Proceed

Submittal review (first 30 days) Applications for Payment (monthly) Progress Meetings (bi-weekly) Substantial Completion Punchlist Project Close-out

24

VLK Architects, Inc.

Delivery of Documents @ 335 Days

Construction Period


S

O

N

D

J

F

M

A

M

J

J

A

S

O

N

D

J

F

M

A

M

J

ays

Substantial Completion

370 Days

Stadium Experience

25


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.