Studio 5 Portfolio

Page 1

School of Architecture & Built Environment

Ivy Tee Wei Li l 1001643897 year 3 semester 1

Tutor : Ms Sharon Ong


CONTENT 1.

Design by Researching

1.

Urban Strategy Building Strategy

1.

New Normal Materiality & Texture Building Strategy Functional Space


project 01

Pre Covid The life that we used to has been taken for granted, by us. Performing where the spotlights are on us.

Taking pieces by pieces, producers joining hands with performers stitches out the staging with unimaginable elements, bringing out their best for us, the audience.


project 01

Post Covid The pandemic strikes in, all activities come into halt. Physical contact is then prohibited. Performer falls into despair. All shows shall not be go on. Uncertainties of the future has made the creatives drown into anxiety, and depressed.

Online platform has opened many doors of opportunities, yet it limits us recreating the atmosphere experience that can only be portray through live performance.


project 01

Audience patiently wait at the waiting area, in order to get into the transportation pods

The audience sit in individual pods. As the show begins, the car pods will be lead to the first stage.


project 01 During the intermission, audience are being lead to an outdoor and back to the performing stage to enjoy the other half of the show.

During the intermission, audience are being lead to an outdoor and back to the performing stage to enjoy the other half of the show.



urban strategy site model

sentul depot


project 02a

urban strategy site issue

targeting low-income families potential industrial worker

retracting historical circulation & buildings


historical facts

project 02a

urban strategy


urban strategy historical facts


urban strategy historical facts


development sketches

project 02b

urban strategy


development sketches

project 02a

urban strategy


master planning

project 02a

urban strategy


master planning

scraped metal from train parts Be transformed into instrument

Revive history yet provide job opportunity bring community together

project 02a

urban strategy



gear locomotive system

project 02a

concept exploration


mechanic industrial pavilion

project 02b

concept exploration


mechanic industrial pavilion

project 02b

concept exploration


adaptive reuse proposal

project 02b

concept exploration


adaptive reuse proposal

project 02b

concept exploration montage


adaptive reuse proposal

project 02b

concept exploration


concept drawing

project 02b

concept exploration


concept drawing

project 02b

concept exploration


concept drawing

project 03

concept exploration


concept models

project 02b

concept exploration


Divider for project 3


draft building model

project 02b

building strategy


development planning

project 03

building strategy


development planning

project 03

building strategy


development planning

project 03

building strategy


project 03 plan development 01


project 03


project 03 plan development 02


project 03 plan development 03


project 03 plan development 04


project 03 model montage


project 03


project 03


project 03


project 03


project 03


project 03


project 03


project 03


project 03

building strategy space diagram

space flowing through sentul depot [ warehouse 2 ] replicate the idea of train parts anchoring with one another


project 03


project 03

x


project 03


project 03


project 03


project 03


project 03


project 03


project 03


project 03

model – the progress making


project 03


project 03


project 03


technical report ivy tee wei li 1001643897


KLCC

BUKIT JALIL

SENTUL

TITIWANGSA

LORONG BALAM

JALA LA N BA

PERSEKUTUAN

A BAY

AN

JAL

AN JAL

JALAN STRACHAN

M

KLIA

WILAYAH

N

NUR

I JA

LA

N PI

JA LA N

JALAN STRACHAN

M

YU

H

LA

N

AK N

LA

T JALAN STRACHAN

PU

JA

ER

PI

BE

JA

HAN RAC N ST

K

LA

O

JA

RK

JALA

N N

ND

A

L

IT

A J

UR UK

K TE

RI

LA

SE

TE

H

AN

JA

LA N

LA

N

JA

KE

DI

LA

UR AD

RH EN TIA PE

SE N

BA TU

JL

AI

LV

SU NG

AN

JAL A

H

AI

IP O

JAL

N

N

NS TRA CHA N

JA

DI

JA JL

N

LA

N

SU P

IA

H

PI

LL

KEY PLAN

LOCATION PLAN

N.T.S

SCALE 1:5000

N

1

KEY AND LOCATION PLAN SCALE NTS

NA N

GK A

AY

1001643897/AR 518/Sem20_07/ L /01


Y EVANS

Gibraltar

Gibraltar

Gibraltar

Gibraltar Gibraltar

EVANS

Gibraltar

Gibraltar

Gibraltar

EVANS

Gibraltar

X -

X -

Y -

2

SITE PLAN SCALE 1:1000


Y EVANS

Gibraltar

Gibraltar

Gibraltar

Gibraltar Gibraltar

EVANS

Gibraltar

Gibraltar

Gibraltar

EVANS

Gibraltar

X -

X -

Y -

3

SITE PLAN SCALE 1:900


Y EVANS

Gibraltar

Gibraltar

Gibraltar

Gibraltar Gibraltar

EVANS

Gibraltar

Gibraltar Gibraltar

EVANS

Gibraltar

X -

X -

Y -

4

GROUND FLOOR PLAN SCALE 1:700


Y -

X -

X -

Y -

5

FIRST FLOOR PLAN SCALE 1:700


Y -

X -

X -

Y -

6

ROOF PLAN SCALE 1:700


Y EVANS

Gibraltar

Gibraltar

Gibraltar

Gibraltar Gibraltar

EVANS

Gibraltar

Gibraltar Gibraltar

EVANS

Gibraltar

X -

X -

Y -

7

GROUND FLOOR PLAN SCALE 1:700


Y -

X -

X -

Y -

8

FIRST FLOOR PLAN SCALE 1:700


9

SECTION X-X SCALE 1:700


10

SECTION Y-Y SCALE 1:400


11

AXONOMETRIC SECTION SCALE 1:150


12

DETAIL SCALE 1:100


13

DETAIL SCALE 1:50


14

DETAIL SCALE 1:20


Y EVANS

Gibraltar

Gibraltar

Gibraltar

Gibraltar Gibraltar

EVANS

Gibraltar

Gibraltar

Gibraltar

EVANS

Gibraltar

X -

X -

Y -

15

GROUND FLOOR PLAN SCALE 1:1000


n

16

COLD WATER SUPPLY PIPING SCHEMATIC DIAGRAM SCALE NTS


Y EVANS

Gibraltar

Gibraltar

Gibraltar

Gibraltar Gibraltar

EVANS

Gibraltar

Gibraltar Gibraltar

EVANS

Gibraltar

X -

X -

Y -

17

GROUND FLOOR PLAN SCALE 1:700


Y -

X -

X -

Y -

18

FIRST FLOOR PLAN SCALE 1:700


19

SEWERAGE SCHEMATIC DIAGRAM SCALE NTS







Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.