Hi
I’M HUANG, CHIH-SHAN
I’m an Industrail Designer
Taipei, Taiwan
and also
Tel: +886 0978855155
a Machanical Design Engineer
E-mail : waterdesign1998@gmail.com
EDUCATION
PROFESSIONAL SKILL
UNIVERSITY
LICENSE
National Taipei University of Technology ( Taipei Tech )
Level B & C Technician for Computer Assisted Mechanical Drawing (CAD)
Dept. of Industrial Design / Product Design Gruop
Level C Technician for Computer Assisted Isometric Drawing (CAD)
2016 - 2020 SOFTWARE HIGH SCHOOL
PTC Creo
2 Years of Experience
Taipei Municipal Muzha Vocational High School
Inventor Pro / AutoCAD
7 Years of Experience
Dept. of Mechanical Drafting
Rihnoceros
3 Years of Experience
2013 - 2016
Keyshot Pro
4 Years of Experience
Adobe CC
4 Years of Experience
LANGUAGES
DESIGN
MADARIN
Native Speaker
ENGLISH
Fluent / TOIEC 750
Design Method, 2D/3D sketch, 3D modeling, Prototyping, Manufacture Process, Color Material Finish design, Product Animation, Motion Graphic Design.
OTHER Reverse Engineering, Product Mechanical Structure Design & Simulation, CAM, 3D Stress Analysis, Sheet Metal Structure Design, 3D Stress Analysis, Basic Mechanical and Electrical Engineering.
EXPERIENCE
AWARD RECORD
Goverment Construction Subcontractor
46th Taiwan National Skills Competition | Computer Assisted Mechanical Drawing
Thin Film Canopy Steel Structure CAD Draftsman
SILVER MEDAL | DEC. 19, 2016
JAN 2018 - RECENT, 2020 NTUT City Maker Faire Online Service Center UI / UX Designer & Founder JUL 2018 - JUN 2020 NTUT City Maker Faire (Advanced Digital Manufacturing Workshop) Technical Administrator JUL 2018 - JUN 2020 INVENTEC Corporation
7th Thermaltake’s Fantasy World & Design Competition | NEON BRONZE AWARD | JUL. 22, 2018 12th UNEEC Applied Design Award | GRID SPIDER GOLD AWARD | DEC. 19, 2018 2020 Young Pin Design Award | SAVIOUR Circular Design - WINNER
| MAY. 30, 2020
Product Design - Finalist
| MAY. 30, 2020
Circular Design - Finalist
| MAY. 30, 2020
Intern of Division of Industrial Design JUN 2019 - SEP 2019 105th NTUT Dept. Industrial Design Young Designers' Exhibition (YODEX)
2020 Golden Pin Concept Design Award | SAVIOUR Concept Design Mark - WINNER
| SEP. 15, 2020
General Convener
2020 TEDA Cup International Youth Design Competition | SAVIOUR
JUN 2019 - JUL 2020
Product Design Award - Shortlisted
NTUT Dept. Industrial Design Online Exihibition Center
2020-2021 Caring for the Enviroment Design Competition | SAVIOUR
UI / UX Designer & Founder
Shortlisted For Review - Shortlisted / In Progress
JAN 2020 - AUG 2020
| DEC. 04, 2020
| DEC. 28, 2020
INDEX.
01.
02.
GRID SPIDER PERSONAL PROJECT 3 MONTHS
03.
SAVIOUR P.1 - P.14
GRAUDUATION TEAM PROJECT 7 MONTHS
H.W.L P.14 - P.26
TEAM PROJECT 3 MONTHS
P.27 - P.40
04.
05.
NEON
I.D.S
PERSONAL PROJECT 3 MONTHS
P.41 - P.56
GRAUDUATION TEAM PROJECT 5 MONTHS
P.57 - P.80
01. 01
GRID SPIDER
PERSONAL PROJECT
3 MONTHS
01. Electricity is one of the most accessible and indispensable resources in
02.
today's life, but we really don't notice that there is a group of unknown
03.
heroes who maintain the indispensable resources in your life and mine.
04.
“To design a Powerful Tool Set for lineman in Taiwan”
05.
DESIGN AWARD : 12th UNEEC Applied Design Award - Gold Award
GOLD
| DEC. 19, 2018
GRID SPIDER
02
03
THE ISSUE
THE ISSUE There are at least 230,000 power towers in Taiwan, and no matter how bad the weather is, you can always see them working hard on the towers. Although the tools used to maintain the towers are well equipped, the
01.
workload is so heavy that the incidence of occupational injuries is so high
02.
that most young people do not want to do this job. With only about 500
03.
linemen in service, the average person is responsible for more than 460
04.
towers, which is very hard work.
230,000 Electric towers in total
500 Lineman in total
05.
460 Towers each person
GRID SPIDER
04
Smart Control Panel
REDUCE ERGONOMIC HARZARDS
Electric Drive System
Lineman are a high-risk group for occupational injuries. One of the most hazardous work items is to move the cable car to thework area with their bare hands. Due to the varying heights of the towers, they often suffer from hand and back lesions. Therefore, we designed the GRID SPIDER to assist them in moving and operating between the towers, which can effectively reduce the
Modular Li-ion Battery Array
risk of occupational injury.
4x 8hr Structural strength
05
THE IDEA
Continuous operation time
1/2x 16kg Storage size
Total weight
Compact Folding System
Wide-angle searchlight
01. 02. 03. 04. 05.
GRID SPIDER
06
Compact Deisgn The compact size of the receptacle makes it easy for the maintenance crew to move deep into the mountains and saves the same amount of space needed for the truck. It can save the space required for the same truck, and can carry more material and tools to increase the efficiency of maintenance tasks. “Increase the efficiency of transportation�
Without fold
Less space available
07
DESIGN DETAIL
With fold
More space available
Easy Fold Convenient and solid folding system, only 4 steps to complete the closure, and the closure structure are verified by computer simulation, the structural strength is increased increased twice as much as the original cable car. 01. 02. 03. 04. 05.
STEP 1.
Recovery power module
STEP 2.
Recovery work platform
STEP 3.
Fold the mainbody
STEP 4.
Complete !
GRID SPIDER
08
Eletric Drive System Powerful and durable electric drive system, through the four independent power modules, the effective load is increased to 2.5 times the original, and the bevel gear transmission designis easy to close and does not affect the power transmission
Front searching light Wild angle white LED
Bevel Gear transmission mechanism Electric motor on each side Mechanic Stress Analysis Verified by INVENTOR
Power System
Electric motor on each side
Li-ion Battery
Replaceable battery array
Ground warning light Red LED on each side
09
DESIGN DETAIL
Li-ion Battery Array The power module contains four detachable lithium batteries with a capacity of up to 345.6 ah for the GRID SPIDER to operate continuously for 8 hours, while the dedicated charger can charge up to four battery packs in 40 minutes.
8hr
345.6ah
Continuous operation time
Total maximum battery capacity
Quick Charge Station
Power by GaN fast charge technology. 40min
40min
GaN
GRID SPIDER
10
Smart Control Panel The integrated information and control center integrates
Status
the required status information (such as weather, wind direction, power, distance, etc.) and operations into a single touch panel, allowing line personnel to quickly grasp the device and its working status.
11
DESIGN DETAIL
Control
Battery
Wind
Diagnosis
GRID WINDLASS The GRID HOIST is a portable windlass that can be easily lifted after the linemen board the tower and can be combined with the GRID SPIDER to facilitate the lifting of materials and supplies during the mission.
200kg 250m
250m
Max. load weight
Max. lifting length
3kg
200kg
Total weight
GRID SPIDER
12
The changes we expect to bring In Taiwan, there are many people who work as line guards, and they are responsible for the important mission of maintaining the needs of our lives. However, because too few people work in these professions, their needs are often overlooked. The original purpose of the design is to improve the problems in people's lives. Through the GRID SPIDER, we hope to inspire the society that it is the unexpected people who accomplish what no one else can.
13
DESIGN GOAL
01. 02. 03. 04. 05.
GRID SPIDER
14
02. 15
SAVIOUR
GRAUDUATION TEAM PROJECT
7 MONTHS
Nowadays, WHO teaches children to swim in deprived areas, but the equipment is very rudimentary, using only empty bottles as the main swimming gear. Through different combinations, SAVIOUR not only
01.
perfects the teaching equipment, but also uses recycled plastic 3D
02.
printing to make it inexpensive and environmentally sustainable.
03. 04. 05.
CO-DESIGNER : Wan-Ju, Wu DESIGN AWARD : 2020 Young Pin Design Award / Circular Design | JUN. 03, 2020 2020 Golden Pin Concept Design Award | SEP. 17, 2020 2020 TEDA Cup International Youth Design Competition | DEC. 04, 2020
TEDA CUP 2020
SAVIOUR
16
17
THE ISSUE
THE ISSUE According to the World Health Organization's report there are 320,000 people die each year from drowning, ninety percent of them occur in resource-poor countries, most of these people were children between the ages of 4 and 15.
01.
The World Health Organization is teaching locally on an ongoing basis, discovering
02.
that teaching swimming is the best way to prevent drowning. The local authorities, however, are not well equipped to teach.As a result, the rate at which they learn to
03.
swim is much slower than in advanced countries.
04. 05.
“For children in countries which are lack of resources,Learning to swim is the key to saving their own lives.�
320,000 Annual drowning deaths worldwide
90%
Resouse-poor countries
4-15yr The highest drowning rates
SAVIOUR
18
Anti-Slip Relief Customized graphics are available to illustrate combinations or simple life-saving steps, and can also beembossed in different countries and languages.
PET Bottle Lock Suitable for the most common bottle type (PCO1810) in the market, with a special leak-proof plug design for increased sealing and stability.
19
DESIGN DETAIL
leak-proof plug
Dual-Way Rotation Lock The 3D printing technology has the advantage of one-piece forming, no assembly is required for production, simple operation and easy to understand.
01. 02. 03. 04. 05.
SAVIOUR
20
Inspire by Precious Plastic Precious Plastic is an open-source plastic recycling program started by Dutch designer Dave Hakkens, By recycling local plastics into a variety of household items. With the open source machine design, platforms and knowledge provided by the project organization, it is possible for the general public to easily achieve the effect of 100% plastic recycling not only to reduce plastic pollution, but also to make a variety of items.
21
CIRCULAR DESIGN CONCEPT
Our Solution For SAVIOUR And through the inspiration of precious plastic, we adopt the c2c cradle to cradle design concept to design saviour. And plan a complete SAVIOUR product life cycle, which can effectively reduce new resource extraction and environmental pollution.
01. 02. 03. 04. SAVIOUR is made entirely from recycled plastic from discarded
05.
PET bottles or other thermoplastic such as PET, HDPE, etc, which can be recycled and remanufactured when damaged or unusable, without using new plastic metarial.
SAVIOUR
22
Form of Combination
Single Swimming Ring
beginner swimmer / adapted to water
32.0kg 1.68kg
Double Swimming Ring
23
THE ISSUE
Large Kickboard
aquatic entertainment
Practice kicking legs.
47.0kg
24.2kg
2.47kg
1.43kg
Increasing water safety Accidental drowning in poor countries occurs mostly on riverside. Saviour can be combined with local waste PET bottles to form a "lifebuoy", because of the low cost, you can set up more on the river, so that when the public must have better facilities to rescue in the first place.
01. 02. 03. 04. 05.
Medium Kickboard
Learn how to do a crawl.
Small Kickboard
Learn how to breathe.
20.0kg
7.80kg
0.99kg
0.23kg
SAVIOUR
24
Model Photography
1 4
25
PRODUCT PHOTOGRAPHY
2 5
3
1. Overview
6
5. Assembly Instructions
2. Anti-Slip Relief
3. PET bottle lock 4. Dual-Way Rotation Lock (male)
6. Dual-Way Rotation Lock (female)
Design Process
01. 02. 03. 04. 05.
1 4
2 5
6
3
1. Print gap test for movable parts 4. 1st Generation prototype
2. Assembly simulation test
5. Prototype production
3. Young Pin Design Award review venue
6. Bottle lock testing seals.
SAVIOUR
26
03. 27
H.W.L
TEAM PROJECT
3 MONTHS
The popular 90's portable CD player and the modern popular Bluetooth
01.
speaker, through the design of the combination of the two generations
02.
of popular music devices into hwl retro speaker, a multi-functional
03.
Bluetooth player.
04. 05.
CO-DESIGNER : Wan-Ju, Wu & I-Chen, Lin DESIGN AWARD : 2019 NTUT.ID 1st Design Week Award | JUN. 14, 2019 Best Professional Skill Maturity Award
H.W.L
28
PROJECT GOAL This work is an advanced product design course - Transformation. The project is to disassemble the old appliance and design a new appearance and reassemble it with complete function. The purpose of this project is to train the product design students on structural concepts and reverse engineering, and we chose a CD player as the topic.
Reverse Engineering
116 pcs Total number of parts
29
PROJECT STORIES
72hr
Total reverse modeling hours
01. 02.
Panasonic
03.
Portable CD Player SL-S310
04. 05.
H.W.L
30
Combination of popular At the beginning of the design process, we felt that it was not a difficult task to design a new shape alone, so we came up with the challenge of combining Bluetooth audio, so that we could not only listen to CDs, so we bought a Bluetooth audio component and combined the two products through electromechanical integration, and shared the same switch and power supply.
Panasonic
31
DESIGN DESTAIL
The 90s
Nowadays
Play with CD
Play with Smart Phone
01. 02. 03. 04. 05.
H.W.L
32
A classic of two generations Finally we designed the HWL multi-functional speaker, we use the G3 G3 curvature rounding on the edges of the pentagon shape for a more comfortable visual experience, and use elastic fabric for the top cover material and leather for the handle, and the final product successfully retains the complete CD and Bluetooth playback function.
BT Streaming from xy meter
33
DESIGN FEATURE
High-Quality Mic Conferencing
High-Quality CD reader
01. 02. 03. 04. 05.
H.W.L
34
Bluetooth speaker system.
2 x 2.5W Rated Power
Internal Structural Design The electrical and mechanical integration is the more difficult part of this project, because the product operation voltage is different, and the shape design affects the internal wiring planning, so in the integration of a single power supply and switch failed many times, but good through some related books and experiments, and finally successfully combined the two systems.
Elastic Fiber Cloth
35
INTERNAL STRUCTURAL
2 x 31mm Dyanmic Driver
CD Player System
Bluetooth speaker system.
Q 100Hz - 18Khz Passive Radiator Bass Boost
Frequency Responce
H.W.L
36
Mix and matchable. The use of Elastic Fiber Cloth in the interchangeable top cover allows HWL to have more color options, so that customers can match different colors and fabrics according to their own preferences when they are produced externally.
Sky
37
COLOR SCHEME
Coral
Sand
Lake
Charcoal
Chalk
H.W.L
38
Project Photography
1 2
39
3
4
PROJECT PHOTOGRAPHY
5 6
7
1. CD player disassembly parts record 4. Modify button position
2. Curved Surface Expansion Diagram
5. Assembled vertical button holder
3. Cloth wrapping process test
6. Speaker units installed
7. BT motherboard installed
01. 02. 03. 04. 05.
1
2
3
4
1. CD player motherboard installation
5
4. Product photos
2. Dual system integration test boot
3. Integrated assembly test
5. Test Playback Function
H.W.L
40
04. 41
NEON
PERSONAL PROJECT
3 MONTHS 01.
A powerful E-ATX gaming case designed for PC gamers, it not only
02.
has a speedy form factor and dazzling lights, but also has excellent
03.
and powerful expansion and cooling capabilities.
04.
“Design For Gamer By Gamer”
05.
DESIGN AWARD : 7th Thermaltake’s Fantasy World & Design Competition | DEC. 19, 2018
BRONZE
thermaltake
NEON
42
PENROSE TRIANGLE
43
DESIGN CONCEPT
Inspiration from psychedelic shapes
01. 02.
NEON's design is inspired by Penrose triangle, known as the Penrose tribar
03.
or the impossible tribar, is a triangular impossible object, an optical illusion consisting of an object which can be depicted in a perspective drawing, but
04.
cannot exist as a solid object. It was first created by the Swedish artist Oscar
05.
Reutersvärd in 1934. And NEON design using this imagery to express the player's courage to challenge the impossible in the virtual game world.
NEON
44
SYNC EVERYTHING YOU LOVE NEON's built-in full-domain dynamic lighting control system can be integrated with mainstream lighting control systems on the market, whether it's motherboards, graphics cards, fans, etc., to bring gamers cool lighting visual effects through stable synchronization.
Colors in total
45
DESIGN DETAIL
Universal synchronization function
01. 02. 03. 04. 05.
NEON
46
47
DESIGN DETAIL
Dynamic Cooling Solution NEON's powerful cooling system can accommodate one set of 540 or 360 radiator in front, one set of 360 radiator
01.
on top and one set of 360 radiator on bottom, and up to 13 sets of fans, and through the special angled cabin design,
02.
it can take care of the aesthetics of the reinforced glass
03.
panel and exhaust heat more effectively.
04. 05.
MAX. RADIATOR CAPACITY
540mm
x1
360mm
x3
NEON
48
49
DESIGN DETAIL
Modular Expansion System NEON's special dual-chamber design separates the power supply and hard disk from the core area, reducing the heat source waste heat buildup caused by the core components and power supply, hard disk, etc. Through this design, airflow can be effectively separated into two chamber, and the modular expansion system of the back chamber
FRONT CHAMBER
makes it easy for players to replace hard disks and power supplies.
or 3.5’ HDD
X4
BACK CHAMBER
+ 2.5’ SATA SSD X4
Full Size PSU
NEON
50
Built-in Distro-Plate Custom-made distro-plate uses dual pumps to speed up the water flow to cope with larger cooling solutions. Integrates the water tank, water channel, and pump into a single component, which can be quickly assembled into a complete open water cooling system, and through the rgb synchronous lighting technology, the whole water channel board becomes the core component of neon.
2L dual pump
51
DESIGN DETAIL
up to 2L
01. 02. 03. 04. 05.
NEON
52
BUILT FOR GAMERS BUILT BY GAMER The design process of NEON integrates my own experience in assembling computers, so I know that the computer case is the component that can highlight the personality of the player, and I understand what the computer player needs most in the case, and I bring these details and needs into the design to design the NEON gaming case.
53
DESIGN STORY
01. 02. 03. 04. 05.
NEON
54
55
FUTURE DEVELOPMENT
COLLABORATION In the future, if the neon can be produced, it will be able to co-brand
01.
with major game manufacturers to launch custom cases, specially
02.
painted on the outer rim of the sheet metal structure, with the RGB lighting effect of the case, is undoubtedly one of the most eye-catching
03.
pc cases in the world.
04. 05.
CYBERPUNK 2077
HYPER BEAST
NEON
56
05. 57
THE ISSUE
Instant Delivery System GRAUDUATION TEAM PROJECT
01.
5 MONTHS
02. 03.
The reason for the lack of breakthrough in the development of drones
04.
today is the obstacle of battery technology.By using a battery-swapping
05.
design, the potential for drone development is unlimited. “The future of logistics shaped by Instant Delivery System”
CO-DESIGNER : Yu-Shian, Lin
INSTAN DELIVERY SYSTEM
58
59
THE ISSUE
Problems with Naive Drone Concept In recent years, we've seen numerous designers spending their creativity on drones' application field, and even though drones dohave a lot of potentials, most people overlook the fact that
01.
drones have a lot of inherent limitations, especially when it comes
02.
to battery life. Of course that is attributable to the battery is one
03.
of the slowest technological advances in today's technology.
04.
Technology Progress
05. Processor
16x
Hard Disk (capacity)
8x
Memory (capacity)
2x 1x
Battery (energy stored)
0
1
2
3
4
5
6
7
INSTAN DELIVERY SYSTEM
60
Revolutionary Instant Delivery System The system was designed to improve the existing drone logistics due to the bottleneck of battery technology development, by
30 M Buildings’ roof top
battery changing stations to allow unlimited range extension, and a combination of ground service stations and high-altitude power stations, so that the logistics system is more automated, to solve the traditional logistics of limited business hours, traffic jams and the uncertainty of delivery time. 3M
01
02
03 1.8 M
Low Labor Cost
No Bussiness Hours Limits
No Range Limits
Service Station Includes package sending / receiving services 4 Drones always stand-by
61
Send DESIGN CONCEPT
01. 02. 03. 04. 05.
Battery Changing Platform
Service Station
30 sec battery quick change
Easy pick-up with APP in the phone
Install on the top of buildings
30 Pick-up boxes avalible
Battery Changing
Recieve INSTAN DELIVERY SYSTEM
62
63
DESIGN DETAIL
Battery Changing Platform 01.
To avoid taking up urban floor space, the battery chaning platform would be installed on the roof-top of the buildings and can help
02.
changing the drone's batteries in less than 30 seconds.
03.
The charging stations also can be deployed in tandem, and drones
04.
can be parked and stored during inclement weather.
05.
INSTAN DELIVERY SYSTEM
64
HYPER-LOOP Charging Cluster The station is equipped with 12 pares of battery packs (72 batteries) which can complete thebattery changing process for the drone in less than 30 seconds. The batteries are stored in the array to be charged and exchanged with the drones when fully charged.
Emergency backup battery system. To ensure that the system is reliable enough to work in emergency situation, the platform also includes a Emergency backup battery system.
65
DESIGN DETAIL
How the charging cluster works 01. 02. 03. 04. 05. WITHDRAW DRAINED BATTERIES
ROTATE THE CLUSTER
INSTALL CHARGED BATTERIES
INSTAN DELIVERY SYSTEM
66
SEND
BATTERY CHANGING
BATTERY CHANGING
67
DESIGN DETAIL
500 x 500 m
Sector Segmentation System
01. 02.
Each battery changing station covers a cicular area, when the drone is drained and needed to change its
03.
batteries, it will search for the closest station to change
04.
the batteries.
05.
RECIEVE
500 x 500 m
INSTAN DELIVERY SYSTEM
68
69
DESIGN DETAIL
Heavy-Duty Crago Drone In order to be able to take weight, the drone was designed for heavy-duty, it comes with 6 modular propellers and 6 batteries
01.
and can carry up to 25KG of loads.
02. 03.
STANDARDIZED DOCKING PORT
04.
To create a sharing platform, we standardized the docking port, as
05.
long as your module have the same docking port, no matter what field of application is your module used for, you can use the same platform (battery chaning) to acheive your task.
INSTAN DELIVERY SYSTEM
70
71
DESIGN DETAIL
Modular Parts Platform Standardized batteries Each drone contains 6 batteries to ensue that the drone is able to
01.
fly long enough with cargo loaded, and the batteries are also designed with quick-change function, once the drone is parked
02.
in the battery changing platform, the batteries will be extracted,
03.
and change with fully charge ones.
04. 05.
Standardized propellers To achieve high efficient economy and enviromental protection, we designed the propeller as an independent module, it can be replaced independently in case of malfuction.
INSTAN DELIVERY SYSTEM
72
Service Station The service station offers a 24/7 logistics service, which includes package sending and recieving.and service stations are installed in community gardens, parks, open spaces, etc. and do not affect the existing transportation network.
73
DESIGN DETAIL
01
02
03
24/7 LOGISTICS SERVICES
COMPLETELY UNMANNED
WAREHOUSING SYSTEM
02 Type in your destination and pay the service fee
Operation Center To send a package, all you need to do is to put
01.
your package in the deliver box and type in your
02.
destination, the system will automatically weigh
03.
the package and caculate the price.
04. 05.
01 Place your package in the box
INSTAN DELIVERY SYSTEM
74
Take-Off / Landing Platform Once the user put the package into the
Service Station Internal Structure We have designed a series of unmanned operation systems in the internal structure of the ground service station in the instant delevery system, including automatic storage system, unmanned aircraft storage hangar, hyperloop charging cluster and emergency power supply, etc. These systems are the most important part of the whole system.
75
DESIGN DETAIL
station, the package will be immediately be sent by a drone parking in the drone garage.
Drone Garage The garage can park up to 3 cargo drones and always stand by for up coming tasks.
01. 02.
Ware-Housing System Once the drone has arrived, the package will
03.
be automatically stored in the Pick-up Cargo
04.
box by the ware-housing system and be ready
05.
for the users to pick up.
Emergency Backup Battery System To ensure that the system is reliable enough to work in emergency situation, the station also includes a Emergency backup battery system.
INSTAN DELIVERY SYSTEM
76
77
DESIGN DETAIL
Real-Time Tracking With the app on your phone, you can track the status of your package anytime, anywhere.
15
The Red House
Your package is ready for pick up
01.
Scan the code on the box to unlock
BATTERY CHANGING
Date 03 / 01 / 2020
Time 10:18 am
02.
SEND
18 km ETA : 16 min
Sent
St. Taipei 101
20.00$
03.
15 St.Taipei 101 113m
04.
BOX
05.
10 : 00 AM
Cargo Drone ZX-24 Battery Changing
NTUT, University
CANCEL Scan qrcode to retrieve goods >>
Destination
Ximen, The Red House
10 : 18 AM
Scan to Unlock To unlock the cargo box and reach your package, all you need to do is scan the QR-Code with the app on your smart phone.
INSTAN DELIVERY SYSTEM
78
9:41
Instant Delivery System
Food
More
Furthure Expansion Shopping
More
We hope that in the future Instant Delivery System will be applied tonot only C2C delivery services, but also
Special offer with Instant Delivery System Subscribed
Emergency Services
79
FUTURE DEVELOPMENT
expansion into B2B andB2C applications, and even other 10 : 00 AM
More
10 : 18 AM
non-commercial applications.
01. 02. 03. 04. 05.
INSTAN DELIVERY SYSTEM
80
Project Sketch
1
81
PROJECT SKETCH
2
3
1. GRID SPIDER
2. NEON
3. SAVIOUR
01. 02. 03. 04. 05.
PROJECT SKETCH
82
WATER DESIGN 2020