Building 1

Performed the semi-annual emergency generator PM service, including 2-hour load bank testing

Performed the annual fire alarm testing of the building strobes and horns

Building 2

Performed the semi-annual emergency generator PM service, including 2-hour load bank testing

Performed the annual fire alarm testing of the building strobes and horns

Where Maintenance Meets Living - Latest Updates & Tips Building 3

Replaced 2 blown fuses in the north end roof top HVAC unit

Performed the semi-annual emergency generator PM service, including 2-hour load bank testing

Building 4

Replaced several timbers around the lobby ellipse that were hit by an unknown vehicle

Performed the semi-annual emergency generator PM service, including 2-hour load bank testing

Indoor Pool Repairs

Indoor pool ceiling, including concrete removal and repainting, were successfully executed by Consolidated Waterproofing (CWC) after a contract with BECS Engineering

Indoor pool and spa replastering contract undertaken by High Sierra Pools, work ongoing.

Repainting of pool and deck in progress; anticipated completion by October 15, 2023.

Reinstalled 2 ceiling light fixtures that were removed during the indoor pool concrete ceiling repairs.

Community Center / Racquet Club

RC - Installed a new water cooler with bottle fill capabilities in the Racquet Club

RC - Enhanced convenience by adding 12 hooks on the Indoor court wall near the entrance for athletic bags

RC - Improved court aesthetics and functionality by installing new side curtains, nets, and adjusting cables

CC - Replaced a cracked urinal in the men’s restroom by the Market Café.