IWA Chelmsford Branch Newsletter Summer 2021

Page 13

Essex Waterways Update With water levels returning to normal it was possible to undertake work at Rushes weir where tree roots had penetrated one of the wing walls and caused this to crack. The roots were removed, the crack tied with purpose made metal straps, new piles placed in front of the wall and backfilled with concrete to prevent further movement. It is planned to place gabions beneath the weir to reduce under scouring. The two large boats, Lady of Avenel and Thames sailing barge Thalata which winter at Heybridge Basin and were trapped by the Covid19 Lockdown have been able to leave, thus making space available for visiting craft which are slowly returning.

As we moved towards the summer major project work on the Chelmer & Blackwater Navigation is replaced by work to ensure that the waterway is ready for returning users, although there were plenty of canoeists and paddle-boarders out and about earlier in the year. Lock landing stages along the Navigation were inspected and repairs undertaken including at Hoe Mill, Cuton Lock and Barnes Lock. At Barnes Lock toe boards were fitted to the narrow bridge over the lock tail. Cuton Lock was closed for two days so it could be dammed for the top gates to be accurately measured to enable new gates to be made ready for installation later in the year.

13


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.