Presentation 1- 6 Nov 17

Page 1

Project Presentation Dated 06 Nov 17


Projects status synthetic pyrothroide 1. Basic Engineering – Completed 2. Detail Engineering – a) Civil – Completed b) Structure – Completed 75% (Roofing, Checker plate details and railing details are pending) c) Equipments Specification – Completed d) Piping specifications – Working e) Instrumentation and Electrical – To be followed after completion of Piping detailing.


Project Status Continues‌ Synthetic pyrothroide‌.. 3. Execution : a. Civil Work : Civil Work completed and foundation is ready for structure installation.


Project Status Continues‌ Equipment Procurement : Total 119 Nos of equipments for procurement. Out of which, for 243 Nos work order finalized. (Total Amount of work order = Rs. 3,72,02,656/-) (Saving for XXX equipments = Rs. 1,31,24,980/-) Remaining purchase orders (124 Nos equipments) to be finalized in next 10 days


Project Status Continues… • Acephate Expansion – 1. Basic Engineering – Completed 2. Detail Engineering – a) b) c) d)

Civil – Completed. Structure – Started. Equipments Specification – Completed. Piping specifications – To be started after Synthetic pyrotroide work completed. e) Instrumentation and Electrical – To be started after Synthetic pyrotroide work completed.


Others 1. Utility Expansion. – i) Boiler ii) Chiller iii) Cooling Tower 2. Environment Clearance. 3. Electrical additional Load approvals.- Basic Calculations completed and application to be move forward. 4. Transformer – 1250 KvA


Target • We consider base line target as March 2018 for completion of all the projects but due to structural material constrain, target to be revised. • Pls see revised target for synthetic Pyrotroids -


Project Schedule F:\Working Desktop\1. Plant 4 - synthetic pyrothroides\Planning


Current Expenditure • 2,19,84,247/- Till Date


Project started : 08 Sept 17

Sr. No.

Costing for plant 4 Till 06.Nov.17

Material Description

1

Civil foundation work labour charge basis

2

MS Tor Bar

PO No

PO Date

2017-18/HPM/011

11.09.2017

4700025529

EXPENCESS (Rs)

Foundation work as per drawing on labour charges.

199,920

4700025636

89,159

4700025669

162,632

4700025761

237,875 689,586

3

Foundation Bolts

627,704

MS BOLT 16*750

439

4

RMC vehicles

5

Soling stones

104961

6

Cement Bags

2017-18/HPM/045

887,694

39217

7

Sand DUST RODI

33560

8

MS PLATE 25 mm Plate

4700025622

109,889

9

MS PLATE

4700025669

179,969

10

Tractor trolly trips for soil movement

11

JCB for soil excavation

12

Bricks 4084 Nos

13

Binding wire

289,858 491

68,740

-

4700025683

25.09.17

81492

18,378

18,378

4,700 4700025758

2,749

4700025713

2,838 10,287

14

Strucural Material (Beams and Channels)

Jindal Advance

3,707,790

3,707,790

CONSULTANCY CHARGES 15

16

17

ECO SYSTEM

ASTUTE

NM KULKARNI

RTGS No XXX Dated XXXX

400,000

RTGS No XXX Dated XXXX

200,000

RTGS No XXX Dated XXXX

300,000

RTGS No N282170384904091 Dated 09.10.17

700,000

RTGS No XXX Dated XXXX

500000

RTGS No XXX Dated XXXX

200000 2,300,000

18

MD ENGINEERING

ADVANCE

30.10.2017

5500000

19

CHEMOTECH ENGINEERING

ADVANCE

01.11.2017

3458385

20

YASH ENGINEERING

ADVANCE

01.11.2017

2616425

21

RITA ENGINEERING

ADVANCE

01.11.2017

1550170

21,984,247