1.8 Cavity Systems *Sarking and fasteners omitted for clarity
50mm
5o Angle Ventilated battens—installed as per manufacturers instructions
Timber Castellated batten
Cavity spacer installed on a minimum 5° angle with a 50mm gap between stud batten and spacer
1.8.10 STEP BY STEP Step 1: Install suitable membrane (see wall sarking requirements section 1.4.7
Step 4 Install chosen horizontal support when using the long vertical joiner (see section 1.8.9)
Step 2: Install cavity closer at base of wall (see section 1.8.8) Step 3 Install chosen cavity battens on studs (see section 1.8.3)
Ensure required ground clearance is maintained (see section 1.4.4)
Once the wall has been battened out as per cavity construction details, Weathertex’s product specific standard fixing instructions shall be followed to install the cladding on to the frame. Weathertex