Top Priority Projects FID
Name
From
To
Length (mi)
92
San Pedro Dr
Zuni Rd
Claremont Ave
122
El Pueblo Rd
Jefferson St
142
Central Ave
145
Est. Cost
Lanes 2.75
$1,373,860.00
Edith Blvd
1.2
$600,577.00
Tingley Dr
Atrisco Dr
0.17
$85,549.50
Candelaria Rd
2nd St
10th St
0.63
$316,282.00
214
Alameda Blvd
Barstow St
Edith Blvd
3.24
$1,620,380.00
237
University Blvd
Avenida Cesar Chavez
Las Lomas Rd
1.34
$668,626.00
354
2nd St
Osuna Rd
Lomas Blvd
4.37
$2,183,480.00
370
Central Ave
City boundary
Coors Blvd
2.39
$1,193,270.00
498
Eubank Blvd
Lagrima De Oro Rd
Osuna Rd
0.27
$133,080.00
16.35
$8,175,104.50
9
Sub-Total Count Minimum Sub-Total Cost $85,549.50
Sub-Total Length (mi) & Cost Average Sub-Total Cost $908,344.94
Maximum Sub-Total Cost $2,183,480.00
Multi-Use TRAIL 3
Bear Canyon Arroyo Trail Extension
Wyoming Blvd
West end Arroyo Del Oso GC
1.78
$231,379.00
7
Bear Canyon Arroyo Trail Extension
Brentwood
West end Arroyo Del Oso GC
0.85
$110,134.00
31
Alameda Drain
Matthew Ave
Rio Grande Blvd
0.92
$119,723.00
52
98th St
Dennis Chavez Blvd
Gibson Blvd
1.32
$171,669.00
56
North Diversion Channel
La Cueva/Alameda Wasteway
Albuquerque Main Canal
1.34
$174,367.00
61
Piedras Marcadas Arroyo
Paseo Del Norte
Eagle Ranch Rd
1.05
$135,856.00
95
Unser Blvd
Dellyne Ave
Montano Rd
0.56
$72,607.70
107
Corrales Main Canal
Eagle Ranch Rd
Corrales Riverside Drain
0.91
$118,607.00
144
I-40 Westbound
Unser Blvd
City Boundary
2.71
$351,895.00
335
Alameda Blvd
Jefferson St
Balloon Museum Dr
0.39
$50,998.00
504
Alameda Drain/2nd St
Alameda Drain (E/W)
Osuna Rd
2.65
$344,616.00
505
Corrales Main Canal
Frontage Rd
Eagle Ranch Rd
0.35
$45,444.60
513
Paseo Del Norte Trail
Golf Course Blvd
Coors Blvd
1.25
$162,961.00
660
La Orilla Rd
Coors Blvd
Taylor Ranch Rd
0.7
$91,383.90
759
Bear Canyon Arroyo Crossing
I-25
0.12
$1,500,000.00
760
North Diversion Channel Under Crossing
Menaul
0.1
$1,500,000.00
761
North Diversion Channel Under Crossing
Candelaria
0.1
$1,500,000.00
762
North Diversion Channel Under Crossing w/ W Conn
Comanche
0.38
$1,549,980.00
763
Singer Bridge Widening
North Diversion Channel
0.05
$1,500,000.00
764
North Diversion Channel Under Crossing
Osuna
0.09
$1,500,000.00
765
Osuna Widening Phase II
North Diversion Channel
Sandia Prep
0.5
$64,757.00
766
Eagle Ranch Rd
Coors Blvd
Corrales Riverside Drain
0.75
$97,241.10
767
Unser Blvd
McMahon Blvd
City Limits
1.88
$244,289.00
North Diversion Channel Trial West Side
Name
From
To
768
FID
University Blvd
Gibson Blvd
Rio Bravo Blvd
2.52
$327,439.00
769
Boca Negra Dam Trail
Atrisco
Unser Blvd
0.44
$57,444.80
772
I-40
6th St
University Connection
1.62
$210,134.00
25.33
$12,232,926.11
26 Sub-Total Count Minimum Sub-Total Cost $45,444.60
Length (mi)
Sub-Total Length (mi) & Cost Average Sub-Total Cost $470,497.16
35 Total Count Minimum Total Cost $45,444.60
Maximum Sub-Total Cost $1,549,980.00 Total Length (mi) & Cost
Average Total Cost $583,086.59
Est. Cost
41.68
$20,408,030.61
Maximum Total Cost $2,183,480.00