Top Priority List

Page 1

Top Priority Projects FID

Name

From

To

Length (mi)

92

San Pedro Dr

Zuni Rd

Claremont Ave

122

El Pueblo Rd

Jefferson St

142

Central Ave

145

Est. Cost

Lanes 2.75

$1,373,860.00

Edith Blvd

1.2

$600,577.00

Tingley Dr

Atrisco Dr

0.17

$85,549.50

Candelaria Rd

2nd St

10th St

0.63

$316,282.00

214

Alameda Blvd

Barstow St

Edith Blvd

3.24

$1,620,380.00

237

University Blvd

Avenida Cesar Chavez

Las Lomas Rd

1.34

$668,626.00

354

2nd St

Osuna Rd

Lomas Blvd

4.37

$2,183,480.00

370

Central Ave

City boundary

Coors Blvd

2.39

$1,193,270.00

498

Eubank Blvd

Lagrima De Oro Rd

Osuna Rd

0.27

$133,080.00

16.35

$8,175,104.50

9

Sub-Total Count Minimum Sub-Total Cost $85,549.50

Sub-Total Length (mi) & Cost Average Sub-Total Cost $908,344.94

Maximum Sub-Total Cost $2,183,480.00

Multi-Use TRAIL 3

Bear Canyon Arroyo Trail Extension

Wyoming Blvd

West end Arroyo Del Oso GC

1.78

$231,379.00

7

Bear Canyon Arroyo Trail Extension

Brentwood

West end Arroyo Del Oso GC

0.85

$110,134.00

31

Alameda Drain

Matthew Ave

Rio Grande Blvd

0.92

$119,723.00

52

98th St

Dennis Chavez Blvd

Gibson Blvd

1.32

$171,669.00

56

North Diversion Channel

La Cueva/Alameda Wasteway

Albuquerque Main Canal

1.34

$174,367.00

61

Piedras Marcadas Arroyo

Paseo Del Norte

Eagle Ranch Rd

1.05

$135,856.00

95

Unser Blvd

Dellyne Ave

Montano Rd

0.56

$72,607.70

107

Corrales Main Canal

Eagle Ranch Rd

Corrales Riverside Drain

0.91

$118,607.00

144

I-40 Westbound

Unser Blvd

City Boundary

2.71

$351,895.00

335

Alameda Blvd

Jefferson St

Balloon Museum Dr

0.39

$50,998.00

504

Alameda Drain/2nd St

Alameda Drain (E/W)

Osuna Rd

2.65

$344,616.00

505

Corrales Main Canal

Frontage Rd

Eagle Ranch Rd

0.35

$45,444.60

513

Paseo Del Norte Trail

Golf Course Blvd

Coors Blvd

1.25

$162,961.00

660

La Orilla Rd

Coors Blvd

Taylor Ranch Rd

0.7

$91,383.90

759

Bear Canyon Arroyo Crossing

I-25

0.12

$1,500,000.00

760

North Diversion Channel Under Crossing

Menaul

0.1

$1,500,000.00

761

North Diversion Channel Under Crossing

Candelaria

0.1

$1,500,000.00

762

North Diversion Channel Under Crossing w/ W Conn

Comanche

0.38

$1,549,980.00

763

Singer Bridge Widening

North Diversion Channel

0.05

$1,500,000.00

764

North Diversion Channel Under Crossing

Osuna

0.09

$1,500,000.00

765

Osuna Widening Phase II

North Diversion Channel

Sandia Prep

0.5

$64,757.00

766

Eagle Ranch Rd

Coors Blvd

Corrales Riverside Drain

0.75

$97,241.10

767

Unser Blvd

McMahon Blvd

City Limits

1.88

$244,289.00

North Diversion Channel Trial West Side


Name

From

To

768

FID

University Blvd

Gibson Blvd

Rio Bravo Blvd

2.52

$327,439.00

769

Boca Negra Dam Trail

Atrisco

Unser Blvd

0.44

$57,444.80

772

I-40

6th St

University Connection

1.62

$210,134.00

25.33

$12,232,926.11

26 Sub-Total Count Minimum Sub-Total Cost $45,444.60

Length (mi)

Sub-Total Length (mi) & Cost Average Sub-Total Cost $470,497.16

35 Total Count Minimum Total Cost $45,444.60

Maximum Sub-Total Cost $1,549,980.00 Total Length (mi) & Cost

Average Total Cost $583,086.59

Est. Cost

41.68

$20,408,030.61

Maximum Total Cost $2,183,480.00


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.