WEI LIN | AIA LEED AP SELECTED WORKS
WEI LIN AIA
p: 206.529.7877 | e: weilinarch@gmail.com
LEED AP
Certificates
Registered Architect, State of Texas, 07/2016-Present American Institute of Architect National Council of Architectural Registration Boards LEED AP BD+C, USGBC North Texas Chapter
Education
The University of Texas at Austin, School of Architecture, 07/2007—2012 Master of Architecture 09 Spring: Annual Excellence in Design Award in Michale Garrison Studio 2x Excellence in Design Award Nominee South China University of Technology, School of Architecture, 2002—2007 Bachelor of Engineering with a Major in Urban Planning 4x Pengs Studio Design Scholarship
Professions
Perkins+Will, Dallas, TX, 01/2013-Present Intermediate Architect Develop approaches and lead documentation process in all phases of design from competition / pursuit, programming/planning, schematic design, design development, construciton document, bid/negotiation to construction administration Initiate preliminary design concepts and develop them into refined representations including free hand sketch/render, physical study models/presentation models and computer models for advanced rendering/animations for design evaluation Set up project team drawing standards, software parameters and manual, manage team wide BIM operation, establish automated parametric workflow with custom scripts to guide the transition into an integrated design platform Research building codes and sustainable principles for project implementation, prepare building energy/daylight simulations to optimize buildings performance, identify passive design potential, assist sustainable leadership to maintain deliverable consistency Organize public meetings, presentations and workshops with government agencies, planning officials, clients and stakeholder for goals and needs; coordinate conversations between clients, architects, planners and other team members Callison, Seattle, WA, 05/2011-12/2011 Intern Designer Independently prepare design studies and alternatives for design team review. Produce renderings, models and presentation graphics for all interim client meetings Produce drawings from schematic design through construction document. Coordinate clients needs with contractors requirements/consultants recommendations and commit a clear, timely and cost-effective production process Meet with client to refine design alternatives and obtain approvals. Investigate and select building systems and materials. Collaborate with construction manager to obtain preliminary pricing and discuss value engineering possibilities Gensler, Shanghai, China, 02/2009-12/2009 Intern Designer Use parametric optimization algorithms to develop building massing and produce directive data for sizing members and locating connections in documentation Participate in design and documentation of curtain wall systems and collaborate with field office on producing assembly drawings in curtain wall bidding package
Selected Projects
OU Medical Center, Oklahoma City, OK Concept Design-Construction Documents From building massing exploration through exterior wall detailing + Medical Planning of all floors + Fit Out package development+ BIM managment for team of 26 Christus Sporn Hospital, Corpus Christi, TX Schematic Design-Construction Administration Site design+ Studies of curtain wall & masonry wall, canopy, chapel+ Core/shell package development+ consultants coodination+ BIM manager for team of 15 UTSW Radiology Oncology Center, Dallas, TX Concept Design-Construction Documents Masterplan analysis+ Massing studies+ Studies of curtain wall & tilt-wall, lobby, stair, canopy+ Office space planning+ Vault layout research+ Future Expansion analysis
2016 AIA Wichita Built Design Award
@ Perkins+Will
WSU Engineering Building, TX Concept Design-Construction Documents Masterplan analysis+ Generation of building shape by anchoring campus green axis Carrollton Police Headquarter, Carrollton, TX Concept Design-Design development, Law Enforcement Operation research+ Development of horizontal visual/material Strata satisfying both the desire for transparency and request for security Houston Maritime Museum, Houston, TX Competition Cultural/environmental impact analysis+ Program research+ Various massing schemes
2016 AIA Dallas Unbuilt Design Award
Dallas Arboretum Education Center, Dallas, TX Competition Visitor experience analysis+ Intergation of form and program with a cyclical travel path
2013 AIA Dallas Unbuilt Design Award
One-Fourty Retail Center, Houston, TX Competition Brand definition + Prototype analysis+ Application methods of sustainable strageties Deep Ellum Masterplan, Dallas, TX Concept Design-Schematic Design Urban texture analysis + Massing studies + Office tenant fitout + Parking Layout study Dongping Plaza Complex, Foshan, China Conceptual Design-Design development Studies of tower typical floor plan and detailing of tower curtain walls
@ Callison
@ Gensler
Proficiencies
China Resource Center Complex, Qingdao, China Conceptual Design-Design development Studies of retail concourse layout, form of atriums/skylights, cinema plan, podium facade composition and tower typical floorplan Shanghai Tower, Shanghai, China Schematic Design-Curtain Wall Tender Package Development of tower form, structural system and curtain wall systems using parametric and BIM programs+ Transition of resultant data to anchor point definitions Resort Hotel, Xiangshan, Xiangshan, China Concept Design-Schematic Design Development of several resort complex master plan schemes+ Massing studies of 2 hotels, beach front villas and yacht club+ Study of hotel facade composition
Two Dimensional Media AutoCad Adobe Creative Suite Sketching using ink, marker, pencil and watercolor
Three Dimensional Media Revit+Dynamo+Vasari SketchUp Rhino+Grasshopper 3Ds Max
Spiral Tube
WEI LIN | AIA LEED AP SELECTED WORKS
Table of Contents shanghai center curtain wbuilt Shanghai Tower Curtain Wall A + B super tall Super Tall
02
utsw radiology utsw radiology oncology oncology cenutsw cUTSW radiology Radiology oncology Oncology Center center medical office building Medical Office Building
utsw radiology oncology cenutsw radiology oncology center 12dical office buildingwichita state university experiental engineering building higher education
2016 aia wichita built honor award Carrollton Police Headquarter civil Civil
18rrollton police headquater civil
2016 aia wichita built honor award Built Projectseducation
24 habitat installation
WSU Engineering Building Higher Education
2016 aia dallas unbuilt award civil/landscape Maritime Museum Civil ft worth i.s.d. vpa/stem academy k-12 Dallas Arboretum Education Center Civil/Landscape maritime museum civil One-Fourty Retail Center Competition Retail
28
2013 aia dallas unbuilt award
40-fourty retail center retail
OU Medical Center Expansion Healthcare
ou medical center expansion healthcare Christus Spohn Hospital Expansion Healthcare christus spohn hospital expansion healthcare the Epic at Deep Ellum Projects in Progress Office
wsu engineering building
32 worth i.s.d. vpa/stem academy k-12 36itime museum civil
48 medical center expansion healthcare 54christus spohn hospital expansion healthcare pic at deep ellum office
Spiral Tube Shanghai Tower Curtain Wall A + B
Location: Shanghai, China Completion: Spring 2015 Size: 540,000 Square Meter
The 632 meter tower employs a curtain wall system designed as a symbiosis of two glazed walls—an exterior curtain wall (Curtain Wall A) and an interior curtain wall (Curtain Wall B)—with a tapering atrium in between. The main feature considered for the exterior wall performance is based on a bio-climatic concept of a passive atrium system, where two skins are located in such a way as to create a large, full-height atrium space capitalizing on all the benefits that captured air—and the natural convection of air—can provide. The main support for the exterior curtain wall is a horizontal ring beam consisting of a horizontal pipe laterally supported, by a radial pipe strut support. The horizontal radial pipe transfers the exterior façade lateral load to the inner circular building slab edge. The radial strut pipes are rigidly connected with the horizontal girt while using a hinge connection on the other side—at the interior slab edge steel support—to allow the exterior façade to move up and down relative to the inner structure.
210 °
180 °
150 °
120 °
90 °
Shanghai Tower Curtain Wall A + B 02 I 03
25%
site plan
tower section
40%
55%
70%
85%
tower bracing A wall B wall slabs super column
vertical curtain wall support -glass fins & tension cable
curtain wall horizontal bracing steel tube structure
inner curtain wall B recessed curtain wall for ameniti floors typical office / hotel floors & vertical structure perimeter plenum wall structure @ mechanical levels
thermal / air flow control in arium
Shanghai shanghaiTower towerCurtain curtain Wall wall A + B
04 I 05
atrium sectional perspective
To carry the gravity load of the faรงade and faรงade support structure, two high-strength rods (depending on the zone) are hung from the mechanical room/refuge area above, with a robust steel structure designed within, to the horizontal ring pipe beams at 4.5 meters on-center vertically at every strut location, including an amenity floor that uses steel bushings instead of perpendicular struts to limit lateral movement. Steel bushings move in vertical direction to allow for expected combined closing and opening movements This is also where the curtain wall system vertical expansion joint is located.
horizontal ring pipe &
assembing one
assembing mutilple
vertical tension cable
A wall panel
A wall panels
2010/01/22
幕墙设计图
CURTAIN WALL DESIGN PACKAGE
序号 日期
修改说明
Rev.
Description
Date
建设单位 Client
上海中心大厦建设发展 有限公司 SHANGHAI TOWER CONSTRUCTION & DEVELOPMENT CO., LTD 设计单位 Design Architect
Platinum, Suite 801 No.233 Taicang Road Shanghai China, 200020 Telephone 8621.6135.1900 Facsimile 8621.6135.1999
© 2009 Gensler 合作设计单位 Design Institute
设计顾问 Design Consultants
Project Title
上海中心大厦
SHANGHAI TOWER 工程编号
50.7053.000
Project No.
项目名称 Subject
弱 电
审定
日期
Approved by
Date
审核
日期
Final Check
Date
校 对
日期
Checked by
Date
工程负责人
日期
Chief Architect / Engineer
Date
专业负责人
日期
Architect / Engineer
Date
设 计
日期
Designed by
Date
绘 图
日期
Drawn by
Date
动力
强 电
A1
塔楼幕墙
图纸名称
Tower Curtainwall
Drawing Title
CURTAINWALL DETAILS EXTERIOR CURTAINWALL, TYPE A1 专业
建筑
Specialty
ARCHITECTURE
比例
D.D.
Revision
Release Approval
暖通
fire safing
Design Stage
初步设计
修改版次
Scale
出图签章 给排水
设计阶段
insulated glass ss clip
图号
会 签
A6-603_002
结构 Joint Signature
建筑
Drawing Number
A1幕墙剖面详图SECTION DETAIL - WALL TYPE A1 A3_1: 20 / A1_1: 10
2010/01/22
A6-125
幕墙设计图
CURTAIN WALL DESIGN PACKAGE
序号 日期
修改说明
Rev.
Description
Date
1
Shanghai Tower Curtain Wall A + B
工程名称
本图须加盖本院出图签章,否则一律无效 Invalid Unless Stamped
建设单位 Client
06 I 07
上海中心大厦建设发展 有限公司 SHANGHAI TOWER CONSTRUCTION & DEVELOPMENT CO., LTD
设计单位 Design Architect
Platinum, Suite 801 No.233 Taicang Road Shanghai China, 200020 Telephone 8621.6135.1900 Facsimile 8621.6135.1999
© 2009 Gensler 合作设计单位 Design Institute
设计顾问 Design Consultants
detail @ B wall
工程名称 Project Title
2010/01/22
修改说明
Rev.
Description
Date
上海中心大厦
幕墙设计图
CURTAIN WALL DESIGN PACKAGE
序号 日期
Project No.
Client
项目名称
上海中心大厦建设发展 有限公司
6
A1幕墙剖面详图 SECTION DETAIL-CW A1 A3_1: 20 / A1_1: 10
A6-201
4
A1幕墙剖面详图 SECTION DETAIL-CW A1 A3_1: 20 / A1_1: 10
设计单位
2
Design Architect
A6-201
50.7053.000
Subject
SHANGHAI TOWER CONSTRUCTION & DEVELOPMENT CO., LTD
AIL-CE A1
SHANGHAI TOWER 工程编号
建设单位
Platinum, Suite 801 No.233 Taicang Road Shanghai China, 200020 Telephone 8621.6135.1900 Facsimile 8621.6135.1999
© 2009 Gensler
审定
日期
Approved by
Date
审核
日期
Final Check
Date
校 对
日期
Checked by
Date
工程负责人
日期
Chief Architect / Engineer
Date
专业负责人
日期
Architect / Engineer
Date
设 计
Design Institute
perpendicular strut
日期
Designed by
合作设计单位
laminated glass fin
Date
绘 图
日期
Drawn by
Date
塔楼幕墙
图纸名称
Tower Curtainwall
Drawing Title
A1
CURTAINWALL DETAILS EXTERIOR CURTAINWALL, TYPE A1 专业
建筑
设计阶段
初步设计
Specialty
ARCHITECTURE
Design Stage
D.D.
比例
修改版次
Scale
Revision
设计顾问
出图签章
Design Consultants
Release Approval
Project Title
图号
上海中心大厦
Drawing Number
A6-601
SHANGHAI TOWER
5
W A1
A1幕墙平面详图 PLAN DETAIL-CW A1 A3_1: 20 / A1_1: 10
A6-200_005
3
A1幕墙平面详图 PLAN DETAIL-CW A1 A3_1: 20 / A1_1: 10
A6-200_005
50.7053.000
Project No.
项目名称 Subject
1
审定
3
本图须加盖本院出图签章,否则一律无效 Invalid Unless Stamped
ss closure plate
日期
Approved by
Date
审核
日期
Final Check
Date
校 对
日期
Checked by
Date
工程负责人
日期
Chief Architect / Engineer
Date
专业负责人
日期
Architect / Engineer
Date
设 计
日期
Designed by
curtain wall moment frame gravity load connection
Date
绘 图
日期
Drawn by
Date
塔楼幕墙
图纸名称 Drawing Title
details @ A wall
non thermally broken aluminum extrusion for horizontal stack joint fin tube
工程名称
工程编号
radial perimeter girt
Tower Curtainwall
A1
laminated glass
CURTAINWALL DETAILS EXTERIOR CURTAINWALL, TYPE A1 专业
建筑
设计阶段
初步设计
Specialty
ARCHITECTURE
Design Stage
D.D.
比例
修改版次
Scale
Revision
出图签章 Release Approval
insulaton
北 North
西 West
南 South
东 East
北
North 幕墙面板尺寸 CURTAIN PANEL SIZE (外形经过变形化处理 ) VISUAL REFERENCE
-
Z9-01 546.800
WP3
2009/04/30
扩初设 DESIGN DEVELOPMENT SUBMIT
序号 日期
修改说明
Rev.
Description
Date
建设单位 Client
上海中心大厦建设发展 有限公司
SHANGHAI TOWER CONSTRUCTION & DEVELOPMEN CO., LTD 设计单位 Design Architect
Z8-01 470.64
WP1
Platinum, Suite 801 No.233 Taicang Road Shanghai China, 200020 Telephone 8621.6135.1900 Facsimile 8621.6135.1999
© 2009 Gensler 合作设计单位 Design Institute
Z7-01 394.04
设计顾问 Design Consultants
Z6-01 319.14
工程名称 Project Title
上海中心大厦
SHANGHAI TOWER 工程编号 Project No.
Z5-01 244.44
panel项目名称 orientation / Subject
弱 电
审 定 alocation method
Z4-01 174.240
日期
Approved by
Date
审 核
日期
Final Check
Date
校 对
日期
Checked by
Date
工程负责人
日期
Chief Architect / Engineer
Date
专业负责人
日期
Architect / Engineer
Date
设
日期
计
Designed by
Date
绘
日期
图
Drawn by
强 电
动 力
N
50.7053.000
Date
图纸名称 Drawing Title
暖 通
给排水
Z3-01 104.040
UNWRAPPED EXTERIOR SKIN 专业
建筑
设计阶段
初
Specialty
ARCHITECTURE
Design Stage
D.D
比例
修改版次
Scale
Revision
出图签章
基准外形所在标高 DEFAULT PROFILE LEVEL
Release Approval
45.100
建 筑
结 构
会 签
Joint Signature
Z2-01 38.100
南 Z1-01 South 0.000
幕墙几何形态CURTAIN WALL GEOMETRY CONCEPT
东 East
北 North
西 West
unfolded panel elevation
图号 9 10 7 8 Drawing Number 1 2 3 4 5 6
A6-107
本图须加盖本院出图签章,否则一律无
意图 A2 WALL 3D LEGEND
A2-2
A2-3
A2-4
板块类型A2-1,A2-2,A2-3,A2-4 A2 WALL/ PANEL TYPE A2-1,A2-2,A2-3,A2-4
2010/01/22
A2 panels
幕墙设计图
CURTAIN WALL DESIGN PACKAGE
序号 日期
修改说明
Rev.
Description
Date
建设单位 Client
上海中心大厦建设发展 有限公司 SHANGHAI TOWER CONSTRUCTION & DEVELOPMENT CO., LTD
设计单位 Design Architect
Platinum, Suite 801 No.233 Taicang Road Shanghai China, 200020 Telephone 8621.6135.1900 Facsimile 8621.6135.1999
© 2009 Gensler 合作设计单位 Design Institute
Shanghai Tower Curtain Wall A + B
A2-1
设计顾问 Design Consultants
08 I 09
工程名称
N
Project Title
上海中心大厦
SHANGHAI TOWER 工程编号
North & Ref. North
50.7053.000
Project No.
项目名称 Subject
弱 电
审定
日期
Approved by
Date
审核
日期
Final Check
Date
校 对
日期
Checked by
Date
工程负责人
日期
Chief Architect / Engineer
Date
专业负责人
日期
Architect / Engineer
Date
设 计
日期
Designed by
Date
绘 图
日期
Drawn by
Date
动力
强 电
图纸名称 Drawing Title
EXTERIOR CURTAIN WALL REFERENCE PO 专业
建筑
设计阶段
初步设计
Specialty
ARCHITECTURE
Design Stage
D.D.
比例
修改版次
Scale
Revision
Release Approval
暖通
给排水
出图签章
panel division
图号
建筑
结构
会 签
Joint Signature
Drawing Number
A6-102_002 塔楼平面几何形态 TOWER HORZ PROFILE
A1 WALL PLAN LEGEND
型A1-1,2,3,4 A1 WALL/ PANEL TYPE
3
1
本图须加盖本院出图签章,否则一律无效
A1幕墙3D示意图 A1 WALL 3D LEGEND Invalid Unless Stamped
NTS
A1 panels
Similar to Curtain Wall A, Curtain Wall B is pro -
Shanghai Tower Curtain Wall A + B
posed as a standard segmented, single-floor unitized system. This system spans the entire
cylindri-
cal stack of each zone. It has been determined that a 1.0-meter curtain wall module will work best for
10 I 11
the stacked radius floor plates, as opposed to the standard 1.5-meter for office tenant planning and future flexibility.
典型凸台局部立面 PARTIAL ELEVATION AT TAB - WALL TYPE C A3_ 1: 60 / A1_ 1: 30
3
动力
强 电
给排水
暖通
弱 电
17.7°=6区外部幕墙凸台夹角
签
结构 Joint nature
建筑
B wall balcony plan & elevation
典型凸台区平面放大 ENLARGED FLOOR PLAN
典型凸
Stepping Light Well UTSW Radiology Oncology Center
Location: Dallas, Texas Completion: Spring 2017 Size: 73,000 Square Feet
EXISTING FACILITY
The 73,000 SF program is strategically organized over three floors. The ground level primarily clinical, is characterized by a large, day-lit atrium which is accessed through an exterior garden arrival sequence. The 2nd level is home to most of the clinical staff has a layout that embraces collaboration, transparency and communication. The 3rd level is highlighted by the 150-person flexible conference center. The expressive architecture pays homage to the consistent academic architecture of the existing campus while blending hi-tech, comfort, technology and warmth, satisfying both academia and patient expectations alike.
UP
progression of massing sudy
level 01 floor plan
master plan
volumn shift to
UTSW Radiology Oncology Center
vaults
allow day light
12 I 13 conference space facing downtown
5
4
3
2
TYPICAL NOTES FOR FIRE RAT AND ROOF ASSEMBLY DE 1. 2. 3. 4.
5. 6.
A
03 A-415
A
A.2
05.129
A.2
03 A-415
T/ SCREEN WALL 158' - 0"
T/ SCREEN WALL 158' - 0"
07.421
05.129 05.413
05.121
07.522 T/ PCC LEVEL 03 150' - 0"
07.225
07.522
CL
03.451
T/ STL. LEVEL 03 @ GRID "A" 146' - 0"
03.310
6' - 4"
T/ STL. LEVEL 03 @ GRID "A" 146' - 0"
05.122
CL
06.165
BEYOND 07.225
03.310 05.311
07.811
3' - 0"
05.311
05.418
07.845
3' - 0"
07.052
T/ PCC LEVEL 03 150' - 0"
1' - 11 5/8"
BEYOND
10' - 11 1/4"
1' - 11 5/8"
05.418
07.231 CENTER LINE OF REVEAL
07.524 3' - 5"
01 A-414
07.231
03.451
1' - 6 5/8"
4' - 9 1/4"
07.711
07.524
1' - 3"
CL
05.121
3' - 5"
07.711 04 A-413
10' - 11 1/4"
07.052
7' - 7"
8' - 0"
8' - 0"
05.413 07.421
2ND AND 3RD LEVELS - FLOOR ASSEMBLY - 1 HOUR FIRE RATING - U. 1ST, 2ND, 3RD AND PENTHOUSE LEVELS - ROOF ASSEMBLY WITH ME - 1 HOUR FIRE RATING - U.L. DESIGN NO. P717. 3RD LEVEL - ROOF ASSEMBLY WITH COMPOSITE METAL DECK WITH L SLAB - 1 HOUR FIRE RATING - U.L. DESIGN NO. D925. 1ST LEVEL - ROOF ASSEMBLY WITH REINFORCED CONCRETE STRUC DECK) - 1 HOUR FIRE RATING - 3.2” MINIMUM THICKNESS CONCRETE AGGREGATE AND ¾” MINIMUM COVER FOR REINFORCING – 2012 IBC NUMBER 2-1.1. NO CEILING IS REQUIRED AS PART OF ASSEMBLIES ABOVE IN ORDER EQUIVALENT ASSEMBLY DESIGNS MAY BE USED IF APPROVED IN WR AND AHJ PRIOR TO CONSTRUCTION.
CL 08.432
2' - 11 5/8"
07.424
08.441
CL
8' - 8 3/4"
9' - 0 3/4" R.O.
9' - 0 3/4"
18' - 4 3/4"
08.441
03 A-413
03.310
01 A-413
CL
02 A-412
03.310
07.845
LEVEL 03 130' - 0"
07.811
50' - 0"
50' - 0"
2' - 11 1/4"
07.229
03.451
07.811
CL
50' - 0"
07.219
CL
05.311
5' - 11 1/4"
5' - 11 1/4"
05.311
EQUAL
07.845
EQUAL
3' - 4"
2"
LEVEL 03 130' - 0"
CL 2' - 2 3/4"
6' - 0 3/4" R.O.
08.441 ALTERNATE: 7' - 8 3/4"
08.448
6' - 0 3/4"
5' - 2 1/4"
07.431
08.445 01 A-412
05.581 03.310 EQUAL
03.451 LEVEL 02 116' - 0"
CENTER LINE OF REVEAL, TYP.
CL
05.311
07.219
07.811
09.224
CL
03.451
09.224
05 A-412
4' - 10"
09.290
2' - 1 1/2" R.O.
05.130
B/ PCC 112' - 0 3/4"
07.219
2' - 1"
09.255
3' - 0"
05.214 BEYOND
5' - 11 1/4"
2' - 0" A-450 / 03
26' - 8" R.O.
26' - 10"
4' - 3 1/4"
08.632
3' - 11 1/4"
5' - 11 1/4"
05.214
EQUAL
CL
03.312
8' - 8 3/4"
05.581
CENTER LINE OF MULLION, TYP. 2' - 9 1/4"
CL
32.132
12' - 0 3/4"
08.431
6' - 7 1/4"
3' - 11 1/2"
12' - 0 3/4"
CL
08.913 03.312
03 A-421
03.311
03.311
4"
09.224
03.303 LEVEL 01 100' - 0"
4"
4"
LEVEL 01 100' - 0"
03.303
wall section @ entry canopy
02 WEST WALL SECTION
03 WEST WALL SECTION AT CURTAINWALLS
3/8" = 1'-0"
3/8" = 1'-0"
5
4
3
2
PUBLIC OPEN OFFICES CLINIC RESIDENTS OPEN OFFICE DOT VERTICAL CIRCULATION
landscape
UC REF
CONFERENCE CENTER DINNING ADMIN OFFICE
P
20’
40’ P
10’
P
5’
infiltration into building
UTSW Radiology Oncology Center
0’
14 I 15
level 02 floor plan
wall section @ vault skylight
C
C.6
2' - 8 3/8"
06 A-414
CL
3' - 0"
03.451
CENTER LINE OF PANEL REVEAL, TYP.
16' - 8 3/4"
CL 2' - 11 5/8"
07.219 04 A-422
UTSW Radiology Oncology Center
09.224
08.445
07.219 04.222
08.621
07.22
05 A-415
06 A-415
07.522
07.5
07.522
16 I 17
3' - 0"
07.524
5' - 0 3/4" R.O.
09.224
07.524 07.219
03.31
wall section @ vault skylight
Transparent Security Carrollton Police Headquarter
Location: Carrollton, Texas Completion: Spring 2017 Size: 39,000 Square Feet
Seeking to balance safety requirements with user comfort, the design incorporates the philosophy of transparent security. Natural light abundantly permeates the facility, while six foot perimeter walls provide exterior security. A prominent feature of the design is a floating canopy that visually makes the facility appear larger than a typical one story building. To keep the existing facility operational throughout the process, the design team structured a multi-phase approach: the original public entrance remained accessible during the adjacent construction of a new 26,000 SF building. Strategic renovations within the existing structure were also completed, including the repurposing of a recently added fitness center into a new SWAT team location. After the Department moved into the new facility, portions of the existing headquarters were replaced with muchneeded covered parking.
Carrollton Police Headquarter
site plan
18 I 19
Sectional Strategy Maximum Protection with Masonry @ 6’0” Maximum Transparency & Daylight
15
14
16
13
12
11 07 10
09
01 08 02 06 03
04
05
07
level 01 floor plan
5 10
25
50
01 intelligence
05 lobby
09 administration
13 briefing
02 war room
06 records
10 interrogation
14 report writing
03 investigations
07 locker room
11 break room
15 sergants
04 briefing
08 exercise
12 quartermaster
16 swat/storage
EXISTING
CO U
1994
RTH
OU
SE
2002 1994
1986 2002 1979
CO JUARI LTH O
phase I PHASE
existing EXISTING 2012
19861986
1979
2012
I
1986
PHASE I DEMOLISHED TO STRUCTURE
DEMOLISHED TO STRUCTURE
JAI
L
USE
STAPOLI TIO CE N
STAPOLI TIO CE N
PHASE II
phase II PHASE DEMOLISHED
II
phase III PHASE
III
PHASE III
DEMOLISHED
NEW PARKING CANOPY
CONNECTION TO EXISTING FACILITY
EXISTING E OPERATION
NEW PARKING CAN
RENOVATED INTO NEW SWAT BUILDING
RENOVATED SWAT BUILD
SECURED PARKING LOT
SECURED PA
20 I 21
IMPROVED PLAZA
Carrollton Police Headquarter
EXISTING ENTRY REMAINS OPERATIONAL
IMPROVED PLAZA
CONNECTION TO EXISTING FACILITY
roof plates
clearstory
22 I 23
brick
Carrollton Police Headquarter
skylight
Landscape Gateway WSU Engineering Building
Location: Wichita, Texas Completion: Winter 2016 Size: 142,660 Square Feet
The Wichita State University Experiential Engineering Building (EEB) celebrates applied learning with a facility that forms a new gateway, links to the
2016 AIA Wichita Built Honor Award
past with an Kansas landscape and exploits the dynamic future of engineering. The EEB is the first structure of the Innovation Campus Masterplan on a highly significant site, east of the main-core campus. The building and site plan are organized around a swath of local prairie landscape that forms a literal connection between the city (revitalized West 17th Street) and the University. The building is articulated by two, brick-clad, high-bay manufacturing blocks that bracket and open onto the landscape. The third floor is a metal-clad bar housing computation and simulation labs. The interior is defined by wide corridors throughout for equipment transport and engaging views into the range of labs.
sky shadow horizon land
WSU Engineering Building
24 I 25
campus greenbelt axis
MAIN ELEC
PROJECT STORAGE
IT
G
CATERING STORAGE ELEV CTRL CIRCULATION
Perkins+Will 10100 N. Central Expressway, Suite 300 Dallas, TX 75231 t (214) 283-8700 f (214) 283-8701 perkinswill.com
G
DN
303 S. Topeka Wichita, KS 67202 T 316.262.2691 pec1.com
FEC
LEASE OFFICE
LOUNGE
BASEMENT OVERALL FLOOR PLAN 1/16" = 1'-0"
STORAGE
UP
FEC CONTROL ROOM
DN
AEROSPACE STRUCTURES
FEC
AEROSPACEF PROPULSION
LOUNGE
MANUFACTURING CUBE
F
WORKROOM
METROLOGY
#
ISSUE
DATE
CUBE RECEPTION
FEC
PROJECT & PROTOTYPING
FEC
FEC
ASTRONAUTICS FEC
FEC
MANAGER'S OFFICE
CUT & POLISH
FEC
ELEC
STORAGE
UP DN
CIRCULATION
CIRCULATION
1845 FAIRMOUNT ST. WICHITA, KANSAS 67260-0047
TEL: 316-978-5829
FACILITIES PLANNING
IT
ELEC
FEC
JANITOR IT
FOOD SERVICE DN DN
UP
MENS
D
OPEN OFFICE
ELECTRONICS HUB
WOMENS
LOBBY ELEC
PRINT RECEPTION
FEC
PROJECT INNOVATION HUB
MULTIPURPOSE
PROJECT INNOVATION HUB
JANITOR
EAST STAIRUP
WOMENS
FEC
INNOVATION CUBE #3
MANAGER'S OFFICE
FEC
3D PRINT CENTER
STORAGE
D
W. KITCHEN
WICHITA STATE UNIVERSITY
FEC
FEC FEC
INNOVATION CUBE #2 FEC
TOOL CRIB OFFICE
MENS
TOOL CRIB NEW CONSTRUCTION
MENS
WDM # - 14031
WOMENS ELEC
PROJECT NUMBERS
418 SF
UP
METALLIC PRINTCLEANING ROOM ROOM
INNOVATION CUBE #1
CONFERENCE ROOM
COMMON LOUNGE DN
State Project # - A-012430
IT
State Building # 71500-0087
JANITOR STORAGE
EMERGENCY POWER
3D MEASUREMENT FE-D
STUDENT STAGING AREA
E
STORAGE E
WOOD SHOP
APPROVED BY
MEETING
FE
MICROSCOPY
FEC
JANITOR
FEC
LOUNGE
FEC
IT
DN
FEC
MATERIALS & METALLURGY
FEC
E
CIRCULATION
VIRTUAL INSTRUMENTATION STUDIO
WORKROOM
MENS WOMENS
PROJECT TYPE
MANAGER'S OFFICE
FEC
MANUFACTURING CUBE
CONTROLS
SHOP OFFICE MANUFACTURING PROCESSES
LOUNGE
MANAGER'S OFFICE
FEC
FE
F
VEHICLE DESIGN
FEC
REVISIONS DN
LOUNGE
FEC
POWER & ENGINES
FLUIDS (M&I) FEC
2
LEASE OFFICE
VEHICLE DESIGN OFFICE
FEC
FEC
FEC
DN
LEASE OFFICE
G
FEC
FEC
FEC
FEC
UP
FE
wdmarchitects.com
UP
D
UNISEX RR OFFICE OFFICE OFFICE UNISEX ?RR OFFICE RECEPTION WORKROOM OFFICE HALL
CONFERENCE ROOM
Department of Administration Office of Facilities & Procurement Management Design, Construction & Compliance 800 SW Jackson, Suite 700 Topeka, Kansas 66612-1216 Phone 785-296-8899
MANAGER'S OFFICE DIRECTOR'S OFFICE ADMIN ASSISTANT DIRECTOR'S OFFICE DIRECTOR'S OFFICE DIRECTOR'S OFFICE
STORAGE
level 02 floorplan
level 01 floorplan C
FLOOR PLAN LEGEND
B
8'
16'
32'
KEYPLAN B
EXPANSION JOINT NEW PARTITION XX A-XXX
(ALPHA)
8 5
4
P+W
32'
B
XX A-XXX
EXTERIOR ELEVATION TAG
XX A-XXX
EXTERIOR OPENING TAG REF: A-840 FOR SCHEDULE 6 2
A 1
ORIGINAL CONTRACT DOCUMENTS
WALL SECTION TAG / BUILDING SECTION TAG
X A-XXX ENLARGED PLAN TAG
A-102 7
3
16'
NEW PARTITION
A-012430 ENLARGED PLAN TAG
6
8'
KEYPLAN
EXPANSION JOINT
LEVEL 02 OVERALL FLOOR PLAN
WALL SECTION TAG / BUILDING SECTION TAG
X A-XXX
A
0'
FLOOR PLAN LEGEND
EXTERIOR ELEVATION TAG
XX A-XXX
A
Drawn By:
1/16" = 1'-0"
April 20, 2015
0'
LEVEL 01 OVERALL FLOOR PLAN WICHITA STATE UNIVERSITY
1/16" = 1'-0"
1845 FAIRMOUNT ST. WICHITA, KANSAS 67260-0023
1
LEVEL 02 OVERALL FLOOR PLAN
Original Issue Date:
1
EXPERIENTIAL ENGINEERING BUILDING
C C
(ALPHA)
A
EXTERIOR OPENING TAG REF: A-840 FOR SCHEDULE A
5
4
3
2
1
WSU Engineering Building
26 I 27
Voyage to Seascape Maritime Museum
Location: Houston, Texas Design: Spring 2013 Size: 40,000 Square Feet
Snaking through the east side of Houston lays Buffalo Bayou, a historic landmark for the city. Its shipping and trading lines helped to establish the city of Houston. An opportunity was given to design a museum that helps commemorate, educate, and preserve the stories created from Buffalo Bayou. Instead of a typical introverted museum, the design is extroverted. It resembles a bridge converging with a tower rising out of the ground, leaning slightly towards the water like a bow of a ship. The intent is to take the user on a vertical journey of elevated vistas. The views are directed towards the bayou, the actual subject matter. Views directed to downtown and all the way to the port can be seen from Seascape. Users will see the bayou as they read about it in the exhibits, making it more tangible than conventional museums. Seascape intends to celebrate Buffalo Bayou story through an impactful visual voyage.
wind rose
sun path
context
access
28 I 29
site
Maritime Museum
houston
sun path across the site
receiving
mens
kitchen
staff offices
storage
womens
media
gift
ticket exhibite
lobby
ground floor
Maritime Museum
womens
multi-purpose
roof terrace
30 I 31
level 02
exhibit
level 03
exhibit
roof
level 04
roof
Möbius Path Dallas Aboretum Education Center
Location: Dallas, Texas Design: Spring 2016 Size: 711,660 Square Feet
The more we looked at the cycles or rhythms of nature (the seasons) and considered the cycle of life (from a child visitor to an elder showing a grandchild the Arboretum) to the core mission of the GEC to inspire learning, we felt the building should clearly manifest “cycles.” This concept is understood as an experience, a place, a destination. A figure-eight loop-form is currently described as a “scaffold” for any number of activities. Two floors in some areas, this design is conceived as a single story wrapped around nature. Highlighting a binary relationship between the natural and the humanmade,the structure supports scientific learning and observational learning. There could be a weather station above the gift shop; water may be collected in a spiralin trough; a shade structure could aid in the comfort of the rooftop gardens. One scenario we imagine is a child walking along the loop, gathering climate information, harvesting a vegetable and entering into a classroom lab.
7 year old visits gardens on a field trip, plays in the edible garden
visitor entry
4 year old sees te chrismas lights with grandparents
overlooking path
20 year old 14 year old biology class visits to research plant propagation techniques 16 year old
10 year old girl scout troop visits the butterfly exhibits
education flow
spectrum of experiences
poses for from photos in a woman’s garden
first date to see a cool thursday concert
2016 AIA Dallas Unbuilt Award 2016 TSA Studio Award
Dallas Arboretum Education Center
attends a wedding on the alex camp house lawn
grad student gets summer job as research assistant
lunches everyday on the lula mae slaughter dinning terrace
35 year old home owner attends workshop on composting and edible gardens
32 year old 23 year old
32 I 33
55 year old
26 year old
brings young children to “screen on the green� movie night
50 year old connoisseur never misses scrupture exhibit
40 year old bring kids to summmer camp
46 year old organizes an land care conference in exhibition hall
site plan 65 year old volunteer docent an walks the garden one a week
60 year old retiree participates in bonsal demonstrations
77 year old takes grand children to the garden to see christmas lights
overlook
nature
planting
entry
discovery
teaching
learning outdoor classroom
te r
r me m su
34 I 35
w in
Dallas Arboretum Education Center
ng s p ri
fall
floor plan
Elevated Park One-Fourty Retail Center
Location: Houston, Texas Design: Spring 2013 Size: 80,660 square feet
At the intersection of Main and Holman Street, just south of downtown Houston, Texas rests a sea of pavement and concrete dotted by cars and low-rise buildings. Here, hard, hot surfaces are in unnatural abundance and continue into downtown Houston with little relief. With the challenge to design a new family entertainment center, concepts were developed to oppose the blanket of concrete, an enigma plaguing our cities. One-Forty provides one acre of green space for the forty acres of endless pavement surrounding it. The green space is completely pervious, creating a hole in an otherwise solid blanket of concrete. This swatch of green seemingly cut and lifted out of the ground, creates an elevated accessible park. Similar to a park, it lacks program. However below, protected by the slope, is an approximate 80,000 square feet of various programs. These programs are meant to fuse and synergize with the green slope, and through cross-pollinating create something entirely different. .
2013 AIA Dallas Unbuilt Design Award
One-Fourty Retail Center regional site plan site plan
36 I 37
solar/pv panel
kitchen
rain water collection
greenroof
party rooms
administration ball room
entry
loading lock
windpower dining
recycled materials
play frame
exterior courtyard geothermal
daylight
bakery +beverage entry
rain catcher pavilion
One-Fourty Retail Center 38 I 39
site
ground lifting ground lifting cafe storge kitchen gallery service play partyroom ballroom offce
ingredients
Gloss Strata OU Medical Center Expansion
Location: Oklahoma City, Oklahoma Design: Spring 2017 Size: 600,000 Square Feet
A new eight-story patient tower is planned to be connected to the existing building on the north side where the current emergency room parking. Oriented facing the state capital in far northwest, the Oklahoma University Medical Center is looking towards its future. The new facility is large and will benefit from an architectural approach which acknowledges the need to thoughtfully manage its scale. The intention is to adhere to a limited but carefully chosen material palette(horizontal stripes of cladding with beige terra cotta panel and highly reflective curtain panels) that correlates to the historical layering formation of Oklahoma Gloss Mountain, as well as evokes the natural context of Oklahoma and the immediate campus, through texture, color, and composition.
gloss mountain state park, oklahoma
stripping effect of terra cotta & glass cladding
CAPITAL
OU Medical Center Expansion
40 I 41
SITE
regional site plan
2C
5
4 B
05 40 00 07 42 29
DN-126
06 10 53.2.4A
07 42 29 LEVEL 02 119' - 2"
06 16 43
07 84 43 DN-126
07 21 00.2.4A 06 16 43
164' - 5 3/4" 07 42 29 DN-117 DN-76
05 40 00
DN-81
3
06 16 36
07 21 00.2.4A 07 54 19
07 21 00.2.4A
DN-112 DN-70
DN-14
07 55 58.2.6
DN-126
07 42 13.2.2.B
114' - 2"
07 21 00.2.4A
DN-52
070727272626 060616164343
07 42 13.2.2.B D
DN-122
DN-149
05 40 00
07 55 58.2.5
07 21 00.2.3A
07 55 58.2.4
DN-114
07 54 19.2.7D
DN-114
05 40 00
C:\temp\ARCH-OUMC-CoreShell_PW_linw.rvt
LEVEL 04 07 21 00.2.3A 160' - 6" 06 16 43 05 40 00
08 91 21
07 14 16 07 62 00
9/12/2017 10:53:57 AM
26 56 00 DN-149 DN-24
C LEVEL 04 160' - 6"
A
DN-148
07 21 00.2.4A 07 21 00.2.3A 07 42 13.2.2.B
DN-147
DN-70 DN-112 DN-122
114' - 2"
5
4
DN-10
2C
09 29 00.2.3B 07 42 29 DN-76 DN-126
5
DN-148
07 21 00.2.4A
DN-147
05 40 00
06 16 43
07 21 00.2.3A
DN-20
DN-76
D
07 71 00.A DN-117 DN-112
164' - 5 3/4" 06 10 53.2.4A
DN-42
07 42 29
05 40 00
07 42 29
06 10 53.2.4A
DN-126
07 21 00.2.4A
07 54 19
07 92 00
06 16 43
06 16 36
06 10 53.2.4A 08 44 13
DN-112 DN-126
07 21 00.2.4A DN-42
2C
06 16 43
06 10 53.2.4A B
07 92 00 164' - 5 3/4"
07 62 00 06 10 53.2.4A
DN-117
07 92 00
07 42 29
DN-42
DN-126
05 40 00
09 29 00.2.3B
07 27 26 06 16 36
DN-117
07 42 29
07 54 19
07 21 00.2.4A
DN-14
C
DN-114
DN-52
07 27 26
05 40 00
DN-126
07 21 00.2.4A
07 55 58.2.6
06 16 43 05 40 00
06 16 43
07 21 00.2.3A
2C
DN-149
07 55 58.2.5 07 55 58.2.4
DN-114
09 29 00.2.3B 07 42 29
07 54 19.2.7D
DN-165
A
05 40 00
07 84 43
DN-45
DN-126 DN-148
07 21 00.2.4A DN-81
07 21 00.2.3A
07 27 26 07 16 21 43 00.2.4A 06
DN-147
05 40 00 06 16 43 07 21 00.2.3A
DN-122
DN-122 DN-122
DN-114 DN-114 DN-10
B
DN-10
09 29 00.2.3B
09 29 00.2.3B
05 40 00 5
4 07 21 00.2.3A
3
DN-109
dinning
DN-112 DN-70
07 42 13.2.2.B 07 21 00.2.3A DN-129
admitting
C:\temp\ARCH-OUMC-CoreShell_PW_linw.rvt
05 40 00.K
9/12/2017 10:45:59 AM
9/12/2017 10:53:57 AM
C:\temp\ARCH-OUMC-CoreShell_PW_linw.rvt
DN-76 07 42 29
LEVEL 04 160' - 6"
DN-7603 LEVEL 140' - 4" LEVEL 07 84 4303 140' - 4"
A
details @ podium ribbon window 3
SECTION DETAIL 1 1/2" = 1'-0" 5
4
wood look ceiling
colored/fritted glazing @ admitting for branding
monumental wood stair
wood wall paneling
with glass railing
OU Medical Center Expansion
large format porcelain tile
accent terrazzo flooring
art work
42 I 43
education
admitting
blood bank
cath prep /recovery
level 01 floorplan
courtyard
dinning
new surgical department at OUMC consists of 36 operating rooms (including
level 05-08
one hybrid operating room) distributed over two floors. Each floor is served by its own preop and pacu department. A large central locker room and loungeon levels two and three support thestaff.
OU Medical Center Expansion
Part of a large hospital expansion, the
These areas are connected by amonufloors and encourages wellness. level 04
level 03
level 02
44 I 45
mental staircase that links the two
SPECIFICATION KEYNOTES D
10100 NORTH CENTRAL EXPRESSWAY, SUITE 300 DALLAS, TX 75231 t 214.283.8700 f 214.283.8701 www.perkinswill.com
4A
1O
1O
OWNERS
1D
UNIVERSITY HOSPITALS AUTHORITY & TRUST
1D.4
1D.5
1E
P.O. BOX 26307 OKLAHOMA CITY, OK 73126 D
1E.4
OU MEDICAL SYSTEM
L 04 6"
ROOF 236' - 6"
CONSULTANTS
2' - 6"
3' - 0"
LEVEL 04 160' - 6"
08 80 00.2.6
CIVIL
KIMLEY-HORN AND ASSOCIATES, INC
6"
4' - 0"
4' - 0"
700 NE 13TH STREET & LINCOLN BLVD OKLAHOMA CITY, OK 73104
ROOF 236' - 6"
13829 TECHNOLOGY DR., SUITE A-2 OKLAHOMA CITY, OK 73134 LANDSCAPING
KIMLEY-HORN AND ASSOCIATES, INC STRUCTURAL
ZFI ENGINEERING
13' - 6"
14' - 0"
10' - 2"
10' - 2"
5750 GENESIS CT., SUITE 200 FRISCO, TX 75034
20' - 2" 3' - 0"
20' - 2"
MEP
WSP 3625 NORTH HALL STREET. SUITE 1300. LB-139, DALLAS, TX 75219 CONSTRUCTION MANAGER @ RISK
TURNER CONSTRUCTION CO.
NOTE: THIS SECTION IS TO BE READ IN CONJUCTION WITH GA PLAN SHEETS A10-01-1N & A10-04-1N.
1' - 10 1/2"6"
6' - 0"
LEVEL 08 222' - 6"
10100 NORTH CENTRAL EXPRESSWAY SUITE 600, DALLAS, TX 75231
LEVEL 08 222' - 6"
07 42 29
7' - 0"
C
08 44 13
8411 S. WALKER AVE. OKLAHOMA CITY, OK 73139
WALL SECTION NOTES BY NUMBER
08 80 00.C.3
08 44 13 C
PROGRESS SET FOR REVIEW ONLY THESE DOCUMENTS ARE FOR DESIGN REVIEW AND NOT INTENDED FOR CONSTRUCTION, BIDDING, OR PERMIT PURPOSES. THEY WERE PREPARED BY OR UNDER SUPERVISION OF: TOM REISENBICHLER LICENSE NO: 11401
11' - 0"
11' - 0"
14' - 0"
LEVEL 03 140' - 4"
11' - 7 1/2"
4' - 0"
L 03 4"
LEVEL 07 208' - 6"
07 42 29
PROJECT
08 80 00.C.3
14' - 0" 7' - 2"
7' - 2"
OU MEDICAL CENTER HOSPITAL EXPANSION
4' - 10 1/2"
10' - 0"
14' - 2"
14' - 2"
8' - 7 1/2"
19' - 2"
14' - 0"
5' - 0" 19' - 2"
B
6" 7' - 1"
07 42 29
08 80 00.C.3
LEVEL 05 180' - 6"
07 42 29
08 91 19.A
12' - 11"
C:\temp\ARCH-OUMC-CoreShell_PW_linw.rvt
20' - 0"
LEVEL 01 100' - 0"
LEVEL 06 194' - 6"
CORE & SHELL ISSUE FOR CONSTRUCTION 09/05/17
6"
LEVEL 06 194' - 6"
B
LEVEL 05 180' - 6"
L 01 0"
08 80 00.C.3
1200 EVERETT DRIVE, SUITE 2EO1 OKLAHOMA CITY, OK 73104
LEVEL 02 119' - 2"
5' - 0"
L 02 2"
10' - 7 1/2"
3' - 0"
3' - 0"
21' - 2"
21' - 2"
2' - 10 1/2" 6"
LEVEL 07 208' - 6"
A
LEVEL 04 160' - 6"
MARK
Drawn Checked
WALL SECTION
2
1/4" = 1'-0"
9/12/2017 8:39:01 PM
Approved
3
wall section & elevation LEVEL 04 160' - 6"
DATE
147206.000 KA DN
NOTE: THIS DRAWING SHEET A10-04-
RF
@ patient tower glass & terra cotta curtain wall ENLARGED ELEVATION - SOUTH TOWER B TITLE
WALL SECTION 1/4" = 1'-0"
ISSUE
Job Number A
1
5
1
WALL SECTION 1/4" = 1'-0"
EXTERIOR WALL SECTIONS
1/4" = 1'-0"
4
3
2
SHEET NUMBER
A31-03-1N Copyright © 2017 Perkins+Will 5
4
3
5
2
4
1
3
2
05 12 00.A 05 40 00 06 10 53.2 06 16 36 06 16 43 07 21 00.2 07 21 00.2 07 42 29 07 54 19 07 55 58.2 07 55 58.2 07 55 58.2 07 71 00.A 09 29 00.2
DN-174
2C
07 71 00.A
DN-173 DN-172
DN-171
DN-117
164' - 5 3/4" 06 10 53.2.4A
D
DN-175
DN-14
07 42 29 06 16 36 DN-76
DN-171
DN-175
DN-14
05 12 00.A2
05 12 00.A2
07 55 58.2.6
07 55 58.2.6
07 54 19
DN-81 DN-126
07 21 00.2.4A 06 16 43
DN-163
05 40 00 DN-189
07 55 58.2.5 07 55 58.2.4
DN-114
LEVEL 04 160' - 6" DN-147
07 55 58.2.4 DN-115 DN-52
DN-122
C
05 40 00
07 21 00.2.3A 07 21 00.2.4A DN-10
09 29 00.2.3B
detail
DN-111
DN-20
@ roof garden DN-10 DN-14 DN-20 DN-52 DN-71 DN-76 DN-81 DN-111
B
6A
08 80 00.GL3A DN-42 DN-117
07 84 43 LEVEL 06 194' - 6"
DN-31
239' - 7 1/2"
DN-118
06 10 53.2.4A
JNTSLNT
DN-76
07 54 19
08 80 00.2.6
06 16 36
DN-05 DN-123
07 21 00.2.4A 05 12 00
07 21 00.2.4.A 07 54 19.2.7D 07 54 19
4
07 84 43 ROOF 236' - 6"
A
DN-77 DN-141
DN-20 DN-112 DN-79
08 80 00.GL3A
07 21 00.2.4A
3
2
5
4
6A
6A
2F 08 80 00.GL3A
07 54 19.2.7D 07 54 19.2.6B 07 71 00.A SLOPE
PENTHOUSE ROOF 247' - 2" 06 10 53.2.4A
06 16 43
DN-42
DN-87
DN-118
08 80 00.GL3A DN-81 DN-99
DN-02
DN-117
07 21 00.2.4A
DN-42 DN-45
07 27 26 06 16 36 D
08 80 00.GL3A
DN-107
DN-42
DN-104
DN-117
LEVEL 05 180' - 6"
07 84 43
DN-45 DN-118
07 21 00.2.3A
DN-76
07 84 43
09 29 00.2.3B
DN-01
DN-118
LEVEL 07 208' - 6"
05 40 00
DN-140
DN-56
DN-81
DN-16
DN-05
DN-76 DN-59
08 11 13.B1
DN-20
DN-117 DN-99
DN-123
DN-05
OU Medical Center Expansion
5
9/12/2017 10:42:00 AM
C:\temp\ARCH-OUMC-CoreShell_PW_linw.rvt
08 80 00.2.6
07 21 00.2.4A DN-20
05 40 00
46 I 47
DN-26
2F DN-123
DN-118
DN-112
DN-112
DN-79
6A
DN-79
08 44 13 DN-81
08 44 13
08 11 13.B1 06 10 53.2.4A C
07 21 00.G
DN-23
DN-05
06 16 36
DN-05
07 27 26
09 29 00.2.3B
07 21 00.2.4A
07 27 26
SLOPE
08 80 00.GL3A
ROOF 236' - 6"
05 40 00
DN-151
DN-151
07 21 00.2.3A
05 12 00
DN-123
DN-123
05 40 00
06 16 43 07 21 00.2.4A
06 16 43
05 12 00.A5 06 10 53.2.4A
DN-112
07 21 00.2.4A
DN-109
DN-81
172' - 6"
07 92 00
07 42 13.2.2.B 08 91 21
DN-112
DN-20
6A 6A 164' - 5 3/4"
07 71 00.A 06 10 53.2.4A
DN-117
B
6A
07 42 29
08 80 00.GL3A
06 16 36
DN-69
DN-42 DN-117
07 84 43 LEVEL 06 194' - 6"
DN-31
239' - 7 1/2"
DN-99 DN-45
26 56 00 DN-81
DN-118
JNTSLNT 08 80 00.2.6
06 10 53.2.4A
DN-76 DN-102
07 54 19 06 16 36
DN-76
DN-126
DN-05 DN-123
DN-20
07 21 00.2.4A
06 10 53.2.4A
07 21 00.2.4A
07 54 19
06 16 43
07 54 19.2.7D 07 21 00.2.4.A
05 12 00
DN-24
07 14 16 07 62 00
DN-20
DN-114 DN-161
LEVEL 04 160' - 6"
07 21 00.2.4.A 07 54 19.2.7D 07 54 19
05 40 00
/12/2017 10:42:00 AM
C:\temp\ARCH-OUMC-CoreShell_PW_linw.rvt
08 80 00.2.6 07 84 43 A
07 21 00.2.3A
ROOF 236' - 6"
DN-122 DN-77
details @ patient tower glass
DN-141
DN-20 DN-112
& terra cotta curtain wall
07 21 00.2.4A DN-10
DN-79
07 21 00.2.4A
08 80 00.GL3A
09 29 00.2.3B
Shoreline Beacon Christus Spohn Hospital Expansion
Location: Corpus Christi, Texas Design: Spring 2015 Size: 675,000 Square Feet
The Tower expansion includes the transformation of Christus Shoreline campus by the addition of a new bed tower and consolidating all the existing services into a central and updated new facility for the community. The central lobby creates a welcoming motor plaza and a new front door for the campus. The Lobby showcases the hospital’s mission of faith-based healing by displaying a sculptural chapel located in the lobby. The new tower which includes 38-new critical care beds and a trauma emergency department. The Tower massing was shaped to optimize views of the bay from patient rooms. The common and shared amenities were located to provide views of the bay and become a beacon for the neighboring communities.
tower massing
new experience
community beacon
symbol of excellence for community
community and staff identity brand excellence
creating opportunities by locating stair wells at building corners acting as beacons with high visibility
Christus Spohn Hospital Expansion
NEW TOWER
EXISTING EAST TOWER
48 I 49
EXISTING SOUTH TOWER
medical campus site plan
views
lobby
chapel
tower shaped to orient patient rooms with views of ocean and community
pavilion of light brand/identity experience
christ based healing connetion with existing
LEGEND PATIENT CARE SUPPORT PUBLIC
ROOF
CART WASH
PATIENT ROOMS
CU
CORRIDORS
TECH SOILEDWORK CARTS
TLT
SHAFTS/MECH
BIO WASTE
CNTRL RM
R/FEVS EQUIP STG
US
STAFF ENTRY CONF
EXIT READ PASSAGE
READ
CONSULT
READ
CNTRL RM
PAT CT
US
ALC
TLT
VEST VEST
READ
SEC HOLD EXAM
?
EVS
SEC HOLD EXAM
POT WASH ORTHO EXAM
CSA
COLD PREP
RESUS
TRAUMASTF TLT CORR
RESUS DRY STG
PAT TLT BAKERY STG SEC HOLD EXAM
STAIR #1 STAIR #1
TEAM
CORR
EXAM
SU
EVS
EQ STG
OFC
PAT TLT ISO EXAM
EXAM
ALC SERVERY
CORR
ALC
CORR
EXAM
EXAM
WARE WASH-CLN
ISO EXAM CORR
EXAM
STF TLT
NOUR
ENDO 5 DECONTAM STF LNG
EXAM WARE WASH-SLD
EXAM
EQ STG
PAT ELEV PAT ELEV SHAFT #4PAT #7 ELEVPAT ELEV #8 EXAM #7 #8
SU
ELEC ELEC
CORR CORR
Room
COMM COMM
DINING
MEDS
TRIAGE
FAST FASTTRAK TRK
PAT TLT FAST TRK FAST TRK
TRIAGE
FAST TRK
FAST TRK
ROOF
program of santurary
PAT TLT
STAIR #3 STAIR #3
skylight @ parameter
EQ STG
OBS CU
16
PUB ELEV PUB ELEV #3 #3
FIRE OFC CORR COMMAND
PREP 14
STF TLT
WC STG
NOUR
RECEPT
CORR
PREP 6
PREP 3 OBS
STF LNG
PAT TLT PREP 12 PREP 10
OBSPREP 8
OBS
PREP 15
PREP 16
PREP 13
OBS
PREP 11
PREP 9
STAIR VALET
SACRISTY
ROOF
CORR PREP 2
MAIN ENTRY
function flows
SCRUB RECEPT
DRESS/WAIT REF/ICE
ADMIT OR 13
GRAB & GO
CORR
TLT
STOR28 ELEV
W TLT
ADMIT
M TLT
M LKR ADMIT
M LOCKER
W LOCKER
CORR
FIN COUN NURSE STATION OFC
STORAGE
CHAPEL HALL
FLOOR LEVEL 02 PLAN 02 FLOOR PLAN 01 1/16" = 1'-0"
1/16" = 1'-0" SHORELINE TOWER
CORR
SHORELINE SHORELINE HOSPITAL HOSPITAL
SHORELINE HOSPITAL
OFF
ELEC AS
DICT
SLD UTIL
TLT
CVICU/PACU - 8
level 02 floorplan
1/16" = 1'-0" |
ASE VES
ADMIT
CORR
CHAPEL
TLT F LKR
GIFT SHOP
CHAPEL
EDU
BLD / GAS LAB ADMIT
GIFT SHOP
CHAPEL
P
CORR
ENDO/IR WAITING AREA
? CHAPEL
LEVEL 01 FLOOR PLAN
OFF SUB WAIT
BREAK
MECH PUMP RM
1
TLT
OFC DRESS/WAIT
WAITING
RECEPT LOBBY
CHAPEL
VESTIBULE
SUB STER PUB M TLT ? PUB M TLT
ANESTH SLEEP
chapel OPEN TO BELOW
VEST
EQUIP ? CU
ADMIT
ENDO / IR WAITING AREA
SACRISTY
SUBWAIT
STF TLT
OPENopen TO BELOW to below LOBBY
EVS
PUB W TLT
PREP 1
CNSLT
CNSLT
LOBBY
STAIR #4
DIR. OFFICE
STF TLT. STF TLT.
ALC
CORR OBS
PAT TLT
CORR
TLT
OR 12
ALC
CORR NS
PAT TLT
S
CONSULT
SURGER
SCRB
JAN
prep
PAT TLT
CORR
STF LNG
OFC OR 10
CORR
TEAM
STG
WAIT
shaping
PREPMEDS 7
CORR
PUMP ROOM
EQ STG
OFC
PASTORAL SUB STER CARE 5
PREP 4
PREP 5
PREP - 16 OBSERVATION - 12
SEC
STF TLTSTF TLT
ED ENTRY
CORR
MEDS
NOUR
EVS
CORRIDOR STORAGE
FAMILY TLT
PAT TLT
PAT TLT
OFFICE CU
OBS
CORR
WORK
CORR
OBS
RAD
PUB ELEV PUB ELEV #4 #4
PUB ELEV LOBBY PUB ELEV PUB ELEV LOBBY #1 PUB ELEV #1
CORR
OFC
CORR
RAD
CTRL
WC STG VESTVEST
FAST TRK ALC
STAIR #3
15
OFC
RECOV 11 TEAM
RECOV 10
EVS
OBS EQ STG
RECOV 12
STF TLT
CTRL R/F
CONSULT
OBS
CORR
CORR
PAT TLT
14
LOBBY
TRIAGE
CORR ?
PUB W TLT VEND
CORRCU SU
PAT TLT
HOLD ISO OBS
OFFICE CORR
WORKROOM / COFFEE TRAUMA OR 11
ALC PAT TLT ISO OBS NOUR
SU
CTRL
13
ELEC ELEC
CORR
CORR
CT
CORR
SHAFT #5 ALC
US CORR
SEC
TRIAGE
VESTIBULE FAST TRK
QUIET RM
PAT TLT
PAT TLT
OFCSTF TLT
PUB ELEV
PUB M TLT
RECOV 3
NS
EXAM
STG
PAT TLT SHAFT #7
recovery/stage II RECOVERY/STAGE II - 16
CT RECOV CORR 2
WATER EXAM RM
PAT TLT
SPEC ROOM OFC
#2 PUB ELEV PUB ELEV #2 #2
NS CNSLT
SEC HOLD EXAM ERCP
STAGE II
OFC
PUB TLT
QUIET RM
CORR
dinning CNSLT
OB EXAM
PUB TLT REG. OFC
DISPOSITION
NOUR FAST TRK
MEDICAL RECORDS
CORR
BLOOD DRAW
CORR DINING
EXAM
EKG
MEDS CU/MEDS
ALC RECOV 7
RECOV 5
CORR CORR
RECOV 8
CORR
CORR
HOLD
EQ STG
CORR
LOBBY ? PAT ELEV PAT #5 ELEV PAT ELEV #5 #5
EXAM
CORR
DUMBWAITER
PAT ELEV LOBBYPAT ELEV
EXAM
EXAM
PAT TLT
CU
FAST TRK
CORR
EXAM
NS/ SCHED CORR
SU
PROCESSING
PATSHAFT TLT #3
STAT LAB
PAT TLT
RECOV 6
IMAGING
PUBLIC ELEV PUBLIC ELEV
STAIR #2 STAIR #2 #2 STAIR STAIR #2
RESEARCH
STF TLT ? 4 RECOV
CORR PAT TLT PAT TLT
ALC
STF TLT
CORR
DR LNG
CORR
EXAM
EXAM
FAST TRK
BRONCH
SEC HOLD CORR EXAM
PAT TLT
TRASH
ALC EXAM
ENDO 4
ISO EXAMRECEIVING
EXAM
CORR
TEAM SHAFT #2 CORR
ENDO 3
TEAM
ALC CU
TEAM EXAM
PAT TLT
CORR CC ALC
ISO EXAM
STF TLT
EXAM
KITCHEN
MEDS
CORR
CORR PRI DINING EXAM RM
CORR
SEC HOLD EXAM
ENDO 2
DECON DECON RECOVISO 1 EXAMALC ISO
SCRUB MACHINE
Room
TRAUMA TRAUMA ELEV #9 #9 ELEV
EMS STG CORR EMS STO
ISO TLT ANTE
OFC
OFC
? 29 Room ? 30 ELEV ELEV ELEV 31 31 ELEV 29 ELEV 30 ELEV 31
CORR
TL
NEW CARDIAC STF TLT OR 14
CORR
W LOCKERS
VS STG
FREIGHT FREIGHT ELEV #10 ELEV #10
SU
EXAM
VEST VESTIBULE
SHAFT #8
CORR
CORR
nutrition kitchen
OFC PAT TLT COFFEE
EXAM
EXAM
EMERGENCY DEPARTMENT endoscopy ENDOSCOPY NUTRITION KITCHEN ENDO 1
CORR
EVS SHAFT #1 SHAFT SHAFT #1#1
EXAM
CORR
DISASTER SUPPLYSTAFF TLT
OFC
ELEV MACHINECORR
STF LNG MECH PUMP RM
WORK M LOCKERS
EXAM
EVS EMPLOYEE SUITE
CORR
OFC
READ VS
STF TLT
FIRE STG PUMP RM
CORR TRAUMA
STF TLT ?
WORK ROOM
ON CALL STF TLT
CORR
PLUMBING PUMP RM
AMBULANCE ENTRY
V
VS OFF
EQ STG CORR
ROOF
CHEMIC
CORR
ALC BODY HOLD
TLT
PAT TLT
E.V.S.
SOILED WASTE
I
CORR
PAT TLT US
VERTICAL CIRCULATION EXISTING SPACES TO REMAIN
DIRTY VEST
RAD. WASTE
R/F
CVICU
VE
3
2
1
D
podium
6C
shading screen wall
entry canopy
chapel
4' - 7" 3' - 10 1/2"
Christus Spohn Hospital Expansion
lobby curtain wall
LOBBY 3HC1001
ACM COPING CAP 8"X8" CMU BLOCK
/(9(/
MOD. BIT. ROOFING SYSTEM ON 1/2" PROTECTION BOARD ON RIGID INSULATION SHADOW BOX ASSEMBLY BY CURTAIN WALL MANUF. PAINTED AESS SCREEN SUPPORT BEYOND, SEE STRUCTURAL DWGS PAINTED AESS PLATE ALUMINUM FRAMED CURTAIN WALL METAL FABRIC SCREEN
CONDUIT FOR SIGNAGE INSIDE BEAM
STEEL TUBE PAINTED WITH INTUMESCENT PAINT, REF: STRUCTURAL DWGS
LIGHTED SIGNAGE
50 I 51
3' - 2 3/4"
PR #07.1 – NEW TOWER ADDITION & NEW C.U.P. l 08/19/16
C
B
LOBBY 2GE1011
3' - 2 3/4" /(9(/
SHEATHING & ACM PANELING ON ALL SURFACES OF CONCRETE STRUCTURE LIGHTING:SEE RCP & ELECTRICAL
DRAIN IN COLUMN
SSTL TIE ROD, REF: STRUCTURAL DWGS
ACM COPING CAP
TPO ROOFING SYSTEM ALUMINUM FRAMED CURTAIN WALL AUTOMATIC SLIDING ENTRANCE SYSTEM 15 MIL. UNDERSLAB VAPOR BARRIER KNOX BOX RECESSED IN COLUMN COVER CC-1
WAIT
1AM1006
UNDERFLOOR SUPPLY DUCT
3' - 11"
/(9(/
FLATWORK REF. CIVIL A
wall section @ entry vestibule & canopy
stairs @ corners
patient tower
lobby curtain wall
LEGEND PATIENT CARE SUPPORT
LOADI
PUBLIC CART WASH
PATIENT ROOMS CORRIDORS SHAFTS/MECH
STAFF ENTRY
E.V.S.
SOILED WASTE
EXIT PASSAGE
INTERVEN CARDIOLO
TLT
WORK ROOM ON CALL
OFC
PLUMBING PUMP RM
VS ELEV MACHINE
MECH PUMP RM
AMBULANCE ENTRY
FIRE PUMP RM
SEC HOLD EXAM
ORTHO EXAM
RESUS
RESUS
TRAUMA
TRAUMA
EXAM
EXAM
EXAM
ISO EXAM
SEC HOLD EXAM
PAT TLT
CORR
SU
EVS
EQ STG
EXAM
MEDS
CORR
CORR
EXAM
ISO EXAM
SEC HOLD EXAM STF LNG
EXAM
PAT ELEVPAT ELEV #7 #8
NOUR
TEAM
ISO EXAM
ALC
CORR
DUMBWAITER ELEC
CORR
EXAM
EXAM
CORR
EXAM
EXAM
EXAM
EQ STG
FAST TRK
PAT TLT
CORR CORR
Room
EXAM
PAT ELEV #5
EXAM
EXAM
CT
COMM
CORR CNSLT
EVS
PAT TLT FAST TRK FAST TRK FAST TRK ALC
FAST TRK
QUIET RM
VEND
STAIR #3 STAIR #3
SEC
TRIAGE
TRIAGE
TRIAGE
CORR
FAST TRK
PUB ELEV PUB ELEV #2 #2 PUB ELEV #1
PUB ELEV #3
FIRE COMMAND WORK
CORR
PAT TLT
MEDS
OBS
STF TLT
OBSERVATION - 12
SEC
TRIAGE
OBS
CONSULT
VEST
MRI
PUB W TLT
SUBWAIT
PUB M TLT ? PUB M TLT
RECEPT
GRAB & GO
ADMIT
CORR TLT HR
DRESS/WAIT
DRESS/WAIT TLT STG
ADMIT SUB WAIT CORR ADMIT
ECG
SACRISTY
WK RM
X-
ADMIT
VALET
CHAPEL
STG
ADMIT
? CHAPEL CHAPEL
SPE
P.A.T.
typical patient tower floorplan EDU
SACRISTY
CT
CU
STOR
LOBBY
WAIT
STAIR #4
ED
IMAG
TLT
DIR. OFFICE
OBS
LOBBY
WC STG VESTVEST
STF TLT
MRI
OFC
CORR
STF TLT. STF TLT.
OBS OBS
RECEPT
FAMILY TLT
ALC
PAT TLT STF LNG
WORKROOM / COFFEE
TEAM
CORR
WC STG
ALC
PASTORAL CARE
NOUR OBS
CORR
STORAGE
CORR
CU
OBS RAD
PUB ELEV #4
CORR R/F
CONSULT
OBS
OBS
PAT TLT
PUB ELEV LOBBY
PAT TLT
STF TLT
TEAM OFC
EQ STG
ALC
OFC US
US
OFFICE
WAITING
VESTIBULE
?
PUB TLT
NS CNSLT
FAST TRK
OFC
QUIET RM
REG. OFC
DISPOSITION
NOUR
OB EXAM
ELEV 31
OBS
CTRL OFC
ELEC
CORR
SU
CTRL
PAT TLT
CORR
PAT ELEV LOBBY ?
PUB TLT
EKG
CORR
MEDS
FAST TRK
EXAM
EXAM
BLOOD DRAW
CU
FAST TRK
CORR
EXAM
PAT TLT
STAT LAB
SU
FAST FASTTRAK TRK
CT CORR
EQ STG
CU/MEDS
ELEV 30
OFC
ISO OBS
CORR
STF TLT
ALC EXAM
EXAM
ISO OBS
RAD PAT TLT
EXAM
SU
ALC CU
TEAM EXAM
STG
CORR
patient rooms
EXAM
STF TLT
IMAGING
PUBLIC ELEV
ALC
ALC ALC
CORR CC ALC
ISO EXAM
STF TLT
PAT TLT
CORR
CORR
SEC HOLD EXAM
STG
EXAM
SEC HOLD EXAM
TEAM
ISO EXAM
TEAM
CORR
EXAM
ALC
PAT TLT
CORR
ELEV 29
STAIR #2 STAIR #2
RESEARCH
STF TLT ?
CORR
EXAM
STF TLT/SHOWER
Room
FREIGHT ELEV #10
?
PAT TLT
EVS EMPLOYEE SUITE
DISASTER SUPPLY
VS OFC
OFC
OFC
TRAUMA ELEV #9
DECON DECON
ANTE
MED/SURG PAT RM - 36 EMERGENCY DEPARTMENT
CORR EVS
VS STG
VS OFC
VS OFF
EMS STG EMS STO
ISO TLT
EXAM
VEST VESTIBULE
WORK
OFC
CORR
SEC HOLD EXAM
?
SUPPLY
CHEMICAL
BODY HOLD
VEST VEST
STAIR #1
CLEAN CARTS
EVS EQUIP STG
EXISTING SPACES TO REMAIN
EXAM
CLE DIET
CORR
VERTICAL CIRCULATION
SHAFT SHAFT#1 #1
DIRTY VEST
RAD. WASTE
BIO WASTE
SOILED CARTS
GIFT GIFT SHOP
ASES
ASES
ADMIT ADMIT
PRC
ROOF 245' - 4"
ROOF 245' - 4"
LEVEL 10 227' - 4"
ROOF 245' - 4"
LEVEL 10 227' - 4"
LEVEL 04 143' - 4"
LEVEL 05 157' - 4"
8/19/2016 12:14:10 PM ARCH-Christus-Shoreline-NEW-CoreShell_detached.rvt ARCH-Christus-Shoreline-NEW-CoreShell_detached.rvt 8/19/2016 12:14:10 PM
LEVEL 04 143' - 4"
LEVEL 05 157' - 4"
LEVEL 04 143' - 4"
LEVEL 10 227' - 4"05 LEVEL 157' - 4"
LEVEL 10 227' - 4"
52 I 53
LEVEL 05 157' - 4"
Christus Spohn Hospital Expansion
ROOF 245' - 4"
LEVEL 06 171' - 4"
LEVEL 06 171' - 4"
LEVEL 07 185' - 4"
LEVEL 04 143' - 4"
wall section @ patient tower
Hybrid at the border the Epic at Deep Ellum
Location: Dallas, Texas Design: Spring 2016 Size: 711,000 Square Feet
DOWNTOWN DALLAS with its lofty high-rises creates a landscape ofman-made canyons. A forest of monolithsinterspersed with empty expanses of concreteparking lots, it is impactful but far removed from the human scale.
DEEP ELLUM is well known for its stock of historical industrial buildings and active pedestrian streetscape. Rich in material character, the nearly unbroken urban fabric of the neighborhood is as important as its long history as the musical, artistic and cultural hotbed of the city. Positioned within the overlap of these two distinct areas and as part of the deep ellum mix-use masterplan, the epic office tower defines a new gateway to this distinctive neighborhood and servers as a transition between the pedestrian scale fabric and towering high-rises. Structures are broken into a series of layered forms; a vertical patchwork of the neighborhood. The “Traveling Man� sculpture welcomes visitors to an art-lined street cutting through the site, drawing in the active street life so characteristic to the area. This thoroughfare invokes the muralcovered Good-Latimer tunnel, formerly a symbolic gateway to the area, located adjacent to the site.
the Epic at Deep Ellum
N D OW
TO
M
56 I 57
LU D EEP EL
WN
DOWNTOWN
downtown mixed-use THE EPIC
deep ellum texture
DEEP ELLUM
5
1
3
2
1 Central business district towers 2 Urban canyons 3 Modern rail transport 4 Industrial canvas 5 Lifeblood of the neighborhood 6 Leadbelly playing the twelve string blues 7 Pedestrian scale active streetscape 8 The Traveling Man’s welcoming smile 9 Former neighborhood gateway 10 New life for an historic cultural landmark
58 I 59
4
the Epic at Deep Ellum
8
6 7
9
8
1. open office 2. public lift
office tower
3. service lift 4. toilets 5. mechanical
9
6. terrace 7. deep ellum dart station 8. travelling man sculpture
hotel 10
addition
9. pedestrain gateway 10 retail corridor
residential tower
hotel
site plan
1
2 4
5
1 6
level 11 floorplan
10
30
60 I 61
1. OPEN OFFICE 2. PUBLIC ELEVATORS 3. SERVICE ELEVATORS 4. RESTROOMS 5. MECHANICAL 6. OUTDOOR TERRACE
70
1 2
6
4
3 1
level 08 floorplan
the Epic at Deep Ellum
3
5
Qingdao CRC Center Office & Residential Tower
平面PARTIAL PLAN - ROOF PARAPET 1 : 50
平面PARTIAL PLAN - ROOF PARAPET 1 : 50
平面PARTIAL PLAN - ROOF PARAPET 1 : 50
平面PARTIAL PLAN - ROOF PARAPET 1 : 50
平面PARTIAL PLAN - ROOF PARAPET 1 : 50
平面PARTIAL PLAN - ROOF PARAPET 1 : 50
平面PARTIAL PLAN - ROOF PARAPET 1 : 50
平面PARTIAL PLAN - ROOF PARAPET 1 : 50
平面PARTIAL PLAN - ROOF PARAPET 1 : 50
墙身立面PARTIAL ELEVATION - RO 1 : 50
墙身立面PARTIAL ELEVATION - RO 1 : 50
墙身立面PARTIAL ELEVATION - RO 1 : 50
本图纸须经各相关部门批准后方 不得量取图纸尺寸施工,如有任 事宜,请在施工前与设计师会商
出
注 审
定
审
核
工程主持 专业负责 校
对
设
计
建
筑
电
气
结
构
暖
通
会
签
栏
给 排 水
建设单位
华润置地(山东)有限公
工程名称 青岛华润中心项目 图
名
工程编号 阶
段
比
例
版
号
扩初 1 : 50
合作设计单位:
合作设计单位:
墙身立面PARTIAL ELEVATION - ROOF PARAPET 1 : 50
墙身剖面WALL SECTION - ROOF PARAPET 1 : 50
合作设计单位:
专
业
图
号
日
期
a
(L6及以上)
b c 北塔总面积
幕墙系统1
幕墙系统2
幕墙系统3
16,580
7,148
6,973
Foshan Dongping Plaza Curtain Wall 西塔总面积
21,545
8,951
商业塔楼总面积
38,125
16,099
6,973
幕墙系统4
幕墙系统5 幕墙系统6 (L6及以上)
总 幕墙
1,396 北塔总面积
2,306
31
9,211
1,883 西塔总面积
3,160
42
9,211
3,279 5,466 商业塔楼总面积
37
20
1200 (西塔标准层 WES
180 铝合金窗台板 ALUMINIUM SILL EXTENSION
90
TO
8
9
面
7
R
6
平
5
FE
4
见
3
160
RE
2
26
参
1
300
1000 (北塔标准层 NORT
45
室外 EXTERIOR
10
PL AN S
20
C E
楼板边缘 SLAB EDGE
见
塔楼典型节点
AN
S
Typical Tower Details
PL
平
面
仿不锈钢铝合金扣槽 ALUMINIUM CAP(SIMULATED 180STAINLESS 铝合金窗台板 STEEL FINISH) ALUMINIUM SILL EXTENSION
160
参
26
R207300
90
1:2
35
20
RE
1200 (西塔标准层 WEST TOWER TYPICAL FLOOR)
D1
20
PLAN DETAIL - WALL TYPE "T2" T2墙型平面节点 楼板边缘 SLAB EDGE
.0
D
10
60
彩釉夹胶玻璃 FRITTED LAMINATED GLASS
20
90
0°
B
90
4 5. 0
0°
35
30.00°
15.00°
0 7 5.
° .00
0°
FE
R
300
40
TO
300
室外 EXTERIOR
200 仿不锈钢铝合金扣板 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH)
A
1000 (北塔标准层 NORTH TOWER TYPICAL FLOOR) 1100 (西塔 WT)
10
100
25
25
12
300
12
C
PLAN DETAIL - WALL TYPE "T1" T1墙型平面节点
A1
FLOOR DETAIL - WALL TYPE "T1" T2墙型层间节点
A4
1:2
室外 EXTERIOR
40
1:2
300
26
160
180 铝合金窗台板
COPYRIGHT c 2011 CALLISON ARCHITE
ALUMINIUM SILL EXTENSION
20
2
3
楼板边缘 SLAB EDGE
90
10
35
1
20
90
35
20
B
4
5
6
仿不锈钢铝合金扣板 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH)
A
26
PLAN DETAIL - WALL TYPE "T1" T1墙型平面节点
F
A1
室外 EXTERIOR
1:2
200MIN-400MAX
300 26
45
160
180 铝合金窗台板
室外 EXTERIOR
20
ALUMINIUM SILL EXTENSION
R
平
FE
见
RE
参 TO
面
PL AN S
20
楼板边缘 SLAB EDGE
10
100
25
12
见 6
S
R207300
8
PLAN DETAIL - WALL TYPE "T2" T2墙型平面节点 1:2
500
300
F
350
130
26
160
4
5
6
7
1:2
300
仿不锈钢铝合金扣板 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH)
8
90
楼板边缘 SLAB EDGE
130
上方横梁 LED灯管,亮度最高 HORIZONTAL MULION ABOVE LINEAR LED FIXTURE,BRIGHTEST
20
室外 EXTERIOR
PLAN DETAIL - WALL TYPE "T6" T6墙型平面节点
1857 @NC' 2100
GRID
2176 @ND'
开启扇
2051 @NC'
A
556 @ND' 300 FIN 500 WINDOW 518 @NC' 玻璃翼 开启扇
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
2253 @W1' 2439 @W1' GRID 2108 @W2' 2293 @W2' GRID PARTIAL SECTION - WALL TYPE "T3" T3墙型局部剖面 PARTIAL UNFOLD ELEVATION - WALL TYPE "T4" 1 : 20 T4墙型局部展开立面
50%初步设计 - 建筑部分
塔楼放大详图
ENLARGED TOWER DRAWINGS
A4
A-451 A1
2011.08
ISSUED / REVISED
DATE
50% DETAILED DESIGN
2011.08
1274 @WA'
1 : 20
1 : 20 COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
GRID
1100MIN
794 (西塔 WT) 763 (北塔 NT)
1588 (西塔 WT) 1525 (北塔 NT)
582 @W2'
GRID PARTIAL ELEVATION - WALL TYPE "T5" T5墙型局部立面 50% DETAILED A1 DESIGN ARCHITECTURE PARTIAL SECTION - WALL TYPE "T4" 1 : 20 50%初步设计 - 建筑部分 T4墙型局部剖面 塔楼放大详图 A4 ENLARGED TOWER DRAWINGS 1 : 20
A-452
GRID
627 @W1'
A-453
JINHUIHAI INVESTMENTS, LTD 1F Foshan Media Center Foshan 528315 T 86 757 28783333 F 86 757 28783111 www.dp-plaza.com
10
JINHUIHAI INVESTMENTS, LTD 1F Foshan Media Center Foshan 528315 T 86 757 28783333 F 86 757 28783111 www.dp-plaza.com
佛山市金海汇投资有限公司 OWNER:
CHINA TEAM ENGINEERING CONSULTANTS (BEIJING) CO., LTD SHENZHEN BRANCH 6009 Shennan Avenue Shenzhen 518040 T 86 755 3391 2955
CHINA TEAM ENGINEERING CONSULTANTS (BEIJING) CO., LTD SHENZHEN BRANCH 6009 Shennan Avenue Shenzhen 518040 T 86 755 3391 2955 F 86 755 3391 2956
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
ARCHITECTURAL DESIGN & RESEARCH INSTITUTE OF GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933 F 86 20 86677463
广东省建筑设计研究院 CONSULTANT:
广东省建筑设计研究院 CONSULTANT:
COPYRIGHT
9
佛山市金海汇投资有限公司 OWNER:
1333 .
ARCHITECTURAL DESIGN & RESEARCH INSTITUTE OF GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933 F 86 20 86677463
8
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
190 260
1100
150 300 CHINA TEAM ENGINEERING CONSULTANTS (BEIJING) CO., LTD SHENZHEN BRANCH 6009 Shennan Avenue Shenzhen 518040 T 86 755 3391 2955 F 86 755 3391 2956
1100
楼板完成面 FFL
COPYRIGHT c 2011 CALLISON
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
CALLISON LLC.
CALLISON LLC.
CALLISON LLC.
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
1200
1200
AN
ISSUED / REVISED
DATE 2011.08
4500
1707 (北塔 NT)
GRID
260
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
A-454
2011.08
ISSUED / REVISED
DATE
50% DETAILED DESIGN
2011.08
ISSUED / REVISED
DATE
50% DETAILED DESIGN
2011.08
PROJECT # 209720.01
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
佛山东平新城交通枢纽中心项目
PROJECT # 209720.01
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
佛山东平新城交通枢纽中心项目
3300 PROJECT # 209720.01
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
200 佛山东平新城交通枢纽中心项目
DATE
1300 (西塔 WT)
1100 (北塔 NT)
PARTIAL SECTION - WALL TYPE "T6" 50% DETAILED DESIGN ARCHITECTURE T6墙型局部剖面 PARTIAL ELEVATION - WALL TYPE "T1A" 50%初步设计 - 建筑部分 A4T1A 1墙型局部立面 : 20 塔楼放大详图 A1 1 :ENLARGED TOWER DRAWINGS 20
ISSUED / REVISED 50% DETAILED DESIGN
1200
1200
1433 (北塔 NT)
50% DETAILED DESIGN
楼板完成面 FFL
1333 (北塔 NT)
1100 (北塔 NT)
50% DETAILED DESIGN ARCHITECTURE
GRID 50% DETAILED DESIGN -
1433
3300 FFL
300 1300 (西塔 WT)
2637MIN (北塔 NT) 1300 (西塔 WT)
ARCHITECTURE PARTIAL SECTION - WALL TYPETYPE "T5" "T6" PARTIAL ELEVATION - WALL 50%初步设计 - 建筑部分 T5墙型局部剖面 T6墙型局部立面 塔楼放大详图 A4ENLARGED A11 : 201TOWER : 20 DRAWINGS
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
PL
4500 200
180 楼板完成面
1500 (西塔 WT)
2951MIN (西塔 WT) A
300 150 260 190
TO
10 7
1250
面
ER
3300
1200
180
1798 (西塔 WT)
GRID
平
1200
FFL
PROJECT # 209720.01
佛山东平新城交通枢纽中心项目
B
256 (西塔 2700 (西塔 WT) WT) 224 (北塔 2300 (北塔 NT) NT)
A
JINHUIHAI INVESTMENTS, LTD 1F Foshan Media Center Foshan 528315 T 86 757 28783333 F 86 757 28783111 www.dp-plaza.com
佛山市金海汇投资有限公司 OWNER:
1500 . 12.57°
FFL
3300
楼板完成面
900 1200 DATE
9 6
1 : 2 T1A墙型局部阴影盒平面(北塔) 1 : 20
见
F RE
接线盒 JB
LED检修门 LED CONTROL ACCESS PANEL
CALLISON LLC.
4500 200
PROJECT # 209720.01
DONGPING NEW CITY 200CENTER PROJECT METRO FOSHAN,P.R CHINA
佛山东平新城交通枢纽中心项目
ISSUED / REVISED 50% DETAILED DESIGN
参
SHADOWBOX PLAN DETAILNA- WALL TYPE "T4" T4墙型阴影盒平面节点 PARTIAL PLAN - WALL TYPE "T1A"(NT) E4
楼板完成面
C
300
1200
FFL
1200
200
155
PROJECT # 209720.01 200
B
楼板完成面
8 5
1333
A1
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
CALLISON LLC.
3300 3300
1300
ND'
1200
1200
1200 1200
广东省建筑设计研究院 CONSULTANT:
FFL
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
1100
2600 . 1926 . 300
190 260
楼板完成面
3300
4500
4500
180 铝合金窗台板
ARCHITECTURAL DESIGN & RESEARCH INSTITUTE OF GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933 F 86 20 86677463
ARCHITECTURAL DESIGN & RESEARCH INSTITUTE OF GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933 F 86 20 86677463
395 1200
1500
300 150 260 190
ALUMINIUM SILL EXTENSION
300
3300
180
180
1181 @ND'
1100MIN
50% DETAILED DESIGN ARCHITECTURE
PARTIAL UNFOLD GRIDELEVATION - WALL TYPE "T3" T3墙型局部展开立面 A1 20 PARTIAL1 :SECTION - WALL TYPE "T2" T2墙型局部剖面
88
224
PARTIAL PLAN - WALL TYPE W4 "T6"(NT) T6墙型局部平面 (北塔)TYPE "T1A"(WT) PARTIAL PLAN - WALL E4T1A1墙型局部阴影盒平面 (西塔) : 20 E1 1 : 20
E
C
300
A
玻璃翼
90
1707
2637MIN
2300 ,
0°
ND'
W1'
A
0°闪辉器 .0 BALLAST
GRID
广东省建筑设计研究院 CONSULTANT:
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
69.0
1100
8
500
500 1200
11811798
D
CALLISON LLC.
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
佛山东平新城交通枢纽中心项目
1200
2011.08
256 763
PARTIAL PLAN - WALL TYPE "T5"(NT) PARTIAL PLAN - WALL TYPE "T6"(WT) T5墙型局部平面 (北塔 ) ) T6墙型局部平面 (西塔 E4E11 : 201 : 20
D
90
LED检修门 LED CONTROL ACCESS PANEL
3300 200 900
DATE
FFL
3300
200
200
FFL
1200
ISSUED / REVISED
楼板完成面
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
4500 1980 @ND'
A
A4
B
楼板完成面
1200
500 WINDOW 300 FIN
"
PROJECT # 209720.01
3300
300
ON - WALL TYPE "T2"
180
300 50% DETAILED DESIGN
佛山市金海汇投资有限公司 OWNER:
JINHUIHAI INVESTMENTS, LTD 1F Foshan Media Center Foshan 528315 T 86 757 28783333 F 86 757 28783111 www.dp-plaza.com
佛山市金海汇投资有限公司 OWNER:
582
CHINA TEAM ENGINEERING CONSULTANTS (BEIJING) CO., LTD SHENZHEN BRANCH 6009 Shennan Avenue Shenzhen 518040 T 86 755 3391 2955 F 86 755 3391 2956
1 : 20
C
180
E
1525 .
1200
1200
1200
1200
FFL
1200
200
200
楼板完成面
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
1650 佛山东平新城交通枢纽中心项目
B
1588 .
开启扇 PARTIAL PLAN - WALL TYPE "T5"(WT) 2293 2108 . T5墙型局部平面(西塔) E1 1 : 20PLAN @W2'- WALL TYPE "T4" PARTIAL T4墙型沿轴线W2'局部平面
广东省建筑设计研究院 CONSULTANT:
1200
D
4500
1650 3300
4500 3300
200
200
180
FFL
794
W1'
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
E4
1200
1200
1200
1274
CALLISON LLC.
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
4500 3300 3300
3300
3300
玻璃翼
FFL
C
W2'
7°
300 FIN 500 WINDOW E
C
1200
.6
ARCHITECTURAL DESIGN & RESEARCH INSTITUTE OF GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933 F 86 20 86677463
ARCHITECTURAL DESIGN & RESEARCH INSTITUTE OF GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933 F 86 20 86677463
1200 D
1200
88
楼板完成面
广东省建筑设计研究院 CONSULTANT:
1200 1200
2°
JINHUIHAI CHINA TEAM ENGINEERING INVESTMENTS, LTD CONSULTANTS (BEIJING) CO.,2951MIN LTD 1F Foshan Media Center SHENZHEN BRANCH Foshan 528315 6009 Shennan Avenue T 86 757 28783333 Shenzhen 518040 69.0 F 86 757 28783111 T 86 755 3391 2955 0° www.dp-plaza.com F 86 755 3391 2956
2700 ,
佛山市金海汇投资有限公司 OWNER:
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
556
0°
.8
89
627
91
.1
8°
679MIN
1100 1200
1200
.8
679MIN
10
GRID
F
楼板边缘 SLAB EDGE
7 4
3°
2051 2439
88
500 WINDOW 300 FIN 91 开启扇 玻璃翼 .3 3° 2253 .
PARTIAL PLAN @NC'- WALL TYPE "T3" T3墙型沿轴线 局部平面 PARTIALNC' PLAN @W1'- WALL TYPE "T4" 1 : 20 T4墙型沿轴线W1'局部平面 E1 1 : 20
D
4500
W1'
0°
N1'
10
6
3
69.9
FFL
1857 .
开启扇
.5
9
5
2
3°
楼板完成面
97
8
4
69.9
E4
1 : 20
180
WG'
B
7°
玻璃翼
FFL
B
9
1
300
300 FIN 500 WINDOW
E
楼板完成面
楼板完成面
522MIN
8
7
3
2198 .
玻璃翼
500 WINDOW
PARTIAL PLAN @ND'- WALL开启扇 TYPE "T3" GRID T3墙型沿轴线ND'局部平面 E1 20 PARTIAL1 :PLAN - WALL TYPE "T2"(NT) T2墙型局部平面(北塔)
彩釉玻璃翼(位置长度参见 放大立面) FRITTED GLASS FIN (REFER TO ENLARGED ELEVATION FOR LENTHES AND POSITIONS)
N8'
7
F
.6
E4
开启扇
2176
WA'
6
88
E
3°
0° .8
) 开启扇
0°
500 WINDOW 300 FIN
8° .1 91 1980 . 1419
500 WINDOW
E "T2"(WT)
.8
.3
89
6
2
2198 .
0°
91
0°
89
.8
5
13.50°
.5
2100
2100
97
89
5
10
10
F
rotation effects of curtain wall fins
8°
4 1
9
4
9
1100
1100
NC' F
.7
3
8
ND'
GRID
89
2
7
3
8
JINHUIHAI INVESTMENTS, LTD 1F Foshan Media Center Foshan 528315 T 86 757 28783333 F 86 757 28783111 www.dp-plaza.com
6
JINHUIHAI 1100 INVESTMENTS, LTD 1F Foshan Media Center Foshan 528315 T 86 757 28783333 F 86 757 28783111 www.dp-plaza.com
5
ND'
F
CHINA TEAM ENGINEERING CONSULTANTS (BEIJING) CO., LTD SHENZHEN BRANCH 6009 Shennan Avenue Shenzhen 51804088 T 86 755 3391 2955.8 2° F 86 755 3391 2956
4
W1'
2
7
CHINA TEAM ENGINEERING CONSULTANTS (BEIJING) CO., 150 LTD 300 SHENZHEN BRANCH 6009 Shennan Avenue Shenzhen 518040 T 86 755 3391 2955 F 86 755 3391 2956
1
3
6
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
5
1926 .
4
10
佛山市金海汇投资有限公司 OWNER:
3
9
522 MIN518
2
8
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
1
1
7
COPYRIGHT c 2011 CALLISON ARCHITECTURE
90
ARCHITECTURAL DESIGN & RESEARCH INSTITUTE OF GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933
90
6
10
广东省建筑设计研究院 CONSULTANT:
180 铝合金窗台板
1:2
ALUMINIUM SILL EXTENSION
A1
88
C
300
20
25
90
20
90
35
不锈钢连接件,竖向间距参见放大 立面图 STAINLESS STEEL PLATE,REFER TO ENLARGED ELEVATION FOR VERTICAL SPACING
A6
仿不锈钢铝合金扣板 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH)
100
10 可拆卸仿不锈钢铝合金扣板 REMOVABLE ALUMINIUM PANEL (SIMULATED STAINLESS STEEL FINISH)
FRITTED GLASS SAMPLE 彩釉玻璃样本
A
1 : 10
8
线路向上转入上方横梁中 仿不锈钢铝合金构件 WIRE TURN(SIMULATED UP HERE TO THE ALUMINIUM EXTRUSION HORIZONTAL STAINLESS STEEL FINISH)MULION ABOVE
35
A1
VISUAL ANALYSIS - FRITTED GLASS FIN 彩釉玻璃翼视觉分析
50
40
边缘 楼板 EDGE SLAB
100
50
REFE
参见 平 R TO 面 PLAN
线路向下转入连接件下方线槽中 WIRE TURN DOWN HERE TO THE RACEWAY BELOW STEEL PLATE 彩釉玻璃 FRITTED GLASS 镇流器 BALLAST 接线盒 JB
30
INIU
26
仿不锈钢铝合金扣槽 350 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH)
45
180 ALUM
160
LED灯管,亮度低于幕墙系统6 LINEAR LED FIXTURE,LESS A1 BRIGHTER 1 : 2THAN CURTAIN SYSTEM 6
300
台板 180 铝合金窗台板 金窗 ION 铝合 TENS LL EX ALUMINIUM SILL EXTENSION M SI
88
300
PLAN DETAIL - WALL TYPE "T1" T1墙型平面节点 室外 EXTERIOR
40
B
10
楼板边缘 SLAB EDGE
35
D1
A
D
9
90
10
90
PLAN DETAIL - WALL TYPE "T5" T5墙型平面节点
F
C
8
35
不锈钢连接件,竖向间距参见放大 立面图 STAINLESS STEEL PLATE,REFER TO ENLARGED ELEVATION FOR VERTICAL SPACING D
E
180 铝合金窗台板
20
20
3
160
ALUMINIUM SILL EXTENSION
可拆卸仿不锈钢铝合金扣板 REMOVABLE ALUMINIUM PANEL B(SIMULATED STAINLESS STEEL FINISH) 2
26
楼板边缘 SLAB EDGE
25
100
50
40
10
300
室外 EXTERIOR
仿不锈钢铝合金构件 ALUMINIUM EXTRUSION (SIMULATED STAINLESS STEEL FINISH)
100
接线盒 JB
E
1
180 铝合金窗台板
室外 EXTERIOR
50
30
镇流器 BALLAST
20
ALUMINIUM SILL EXTENSION
LED灯管,亮度不宜影响相邻住宅 LINEAR LED FIXTURE,SHOULD NOT BE TOO BRIGHT TO AFFECT THE ADJACENT RESIDENTIAL TOWERS 线路向下转入连接件下方线槽中 C WIRE TURN DOWN HERE TO THE RACEWAY BELOW STEEL PLATE
9
20
D1
7
1200 (西塔标准层 WEST TOWER TYPICAL FLOOR)
4500
彩釉夹胶玻璃 FRITTED LAMINATED GLASS D
AN
R
5
FE
4
RE
3
TO
参 2
PL
平
面
仿不锈钢铝合金扣槽 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH) 1
1000 (北塔标准层 NORTH TOWER TYPICAL FLOOR)
25
E
50% DETAILED DESIGN ARCHITECTURE
GRID
50%初步设计 - 建筑部分
塔楼放大详图
TOWER-DRAWINGS PARTIALENLARGED SECTION WALL TYPE "T1A" T1A墙型局部剖面
1 : 20
A-455
50% DETAILED DESIGN ARCHITECTURE
50%初步设计 - 建筑部分
塔楼放大详图
A4
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
50%初步设计 - 建筑部分
ENLARGED TOWER DRAWINGS
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
塔楼放大详图
A-456
ENLARGED TOWER DRAWINGS
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
A-457
GRID
GRID
GRID
STEEL BAR
CONCRETE WALL
ALUMINUM PANEL
750
ZIGZAG CURTAIN PANEL INTERIOR
4500
1500
1500
1500
1500
1500
1500
1500
LIGHT BOX VERTICAL CANOPY
CANOPY LOWER EDGE
EXTERIOR
CANOPY UPPER EDGE
TYPICAL ENLARGED PLAN OF PODIUM CURTAIN SYSTEM TYPE II SCHEME III UNITIZED CURTAIN WALL
GRID GRID
D GRID
GRID
GRID
GRID
GRID
GRID GRID
GRID GRID
GRID
GRID
GRID
GRID
GRID
GRID
GRID GRID
GRID
GRID
GRID
GRID
GRID
GRID
GRID GRID
GRI
8100 GRID
GRID
GRID
GRID
GRID
GRID
GRID
GRID
GRID
GRID GRID
GRID
GRID
GRID
750
现浇墙体 CONCRETE WALL
GRID
现浇墙体 CONCRETE WALL
初设计建筑深化
扩初设计建筑深化
% DD _Design Refinement ust 29, 2011
50% DD _Design Refinement August 29, 2011
广告灯箱 LIGHT BOX 竖向折板雨棚 VERTICAL CANOPY 高处雨棚边缘 CANOPY UPPER EDGE
4500
GRID
钢构架 广告灯箱 LIGHTSTEEL BOX BAR 竖向折板雨棚 VERTICAL 天桥CANOPY 高处雨棚边缘 CATWALK CANOPY UPPER EDGE
8100
钢构架 STEEL BAR 天桥 CATWALK
GRID
铝背板 ALUMINUM PANEL 构件式锯齿玻璃幕墙 ZIGZAG CURTAIN PANEL 750
GRID
铝背板 ALUMINUM PANEL 室内 构件式锯齿玻璃幕墙 低处雨棚边缘 ZIGZAG CURTAIN PANEL INTERIOR CANOPY LOWER EDGE 4500
GRID
750
GRID
4500
GRID
裙房幕墙系统二_典型放大平面 方案二 构件式玻璃幕墙(设检修通道) TYPICAL ENLARGED PLAN OF 低处雨棚边缘 PODIUM CURTAIN SYSTEM TYPE II 室外 CANOPY EDGECURTAIN WALL EXTERIOR SCHEME LOWER II STICK
裙房幕墙系统二_典型放大平面 方案二 构件式玻璃幕墙(设检修通道) TYPICAL ENLARGED PLAN OF PODIUM CURTAIN SYSTEM TYPE II SCHEME II STICK CURTAIN WALL
方案二 构件式玻璃幕墙(设检修通道) SCHEME II STICK CURTAIN WALL WITH CATWALK
住宅入口 Mall Main Entry
紧急疏散出口 Emergency Exit
公交入口
住宅入口大堂一
商业次入口
Bus Entry
Residential Entry I
Mall Entry
次主力店
次主力店
Junior Anchor
Junior Anchor
北塔公寓入口
北塔酒店入口
N. Tower S.A. Entry N. Tower Hotel Entry
商业主入口
宴会厅入口
西塔办公入口
Mall Main Entry
Ballroom Entry
W. Tower Office Tvvwer Entry
交通枢纽换
Transit C
佛山市东平广场项
扩初设计建筑深化
Foshan Dongping Plaza Pro
50% DD _Design Refinement August 29, 2011
GRID
GRID
GRID
GRID
8100 GRID
750
现浇墙体 CONCRETE WALL
广告灯箱 LIGHT BOX 竖向折板雨棚 VERTICAL CANOPY 高处雨棚边缘 CANOPY UPPER EDGE
钢构架 STEEL BAR 天桥 CATWALK
铝背板 ALUMINUM PANEL 构件式锯齿玻璃幕墙 ZIGZAG CURTAIN PANEL
室内 INTERIOR 2000 500
4500
GRID
低处雨棚边缘 CANOPY LOWER EDGE
室外 EXTERIOR
佛山市东平广场项目 Foshan Dongping Plaza Project
裙房幕墙系统二_典型放大平面 方案二 构件式玻璃幕墙(设检修通道) TYPICAL ENLARGED PLAN OF
City