POSITION OF THE COMPONENTS IN THE WHOLE STRUCTURE
MANUFACTURE METHODS:
- 3D PRINT MODEL (20H / PER)
- SAND MODEL MAKING (3H /PER)
- CASTING & FILLET (3H / PER)
- FACING (0.5H / PER)
- CNC SLOT (0.5H / PER)
- DRILL HOLES (0.5 H / PER)
- ASSEMBLY TWO PART (0.5H / PER)
STEP1: 3D PRINT
MAKING TIME: 20.0 h / per NUMBER: 2
STEP3: SAND CASTING
MAKING TIME: 2.0 h / per NUMBER: 3
STEP2: SAND MODEL MAKING
MAKING TIME: 4.0 h / per
NUMBER: 3
STEP4: MANULLY POLISH + FACE SURFACE
MAKING TIME: 2.0 h / per NUMBER: 6
STEP5: CNC DRILL ( FOR CONNECTION SLOT)
MAKING TIME: 0.5 h / per NUMBER: 6
STEP6: CNC MILLING ( FOR CONNECT TESTING)
MAKING TIME: 0.5 h / per NUMBER: 2
3 ° Draft angle
Original point (0,0,0)
Remain the gap when glue two parts together for CNC location after casting.
Take this point as ‘Original point’ when use CNC drilling the connection slots.
Milling the timber to match the connector front and back, keep 3° Draft Angle.
Location pins
The Location pins are for making sure it stays in the same position after flipping.
M8 75MMTHE ORIGINAL SITUATION
There are some abandon buildings exsisting on the site. The vertical banks blocked up the people and river. The bank oppsite to the school is the entrance of the whole river.
STEP1: TRANSFORM THE BANKS
The vertical banks are re-shaped into terraces, which forms the primary plantform, the secondary plantform and the thrid plantform beside the school.
STEP2: GENERATE ACTIVITY AREAS
For expanding the school’s field of activity, the collage gallery is generated for students and their parents to take rest. It also aims to create a plantform for people to get closer with river.
STEP3: CONNECT SLOW TRAVEL SYSTEM
Along the banks, the pedestrain system and cycling system are introduced from city roads to river path. In order to strengthen the two shores connection, dean steps should be established.