Willa Chu
B I M P O RT F O L I O 2020
Table of Contents
BIM 3D Modeling – Architectural, Structural, HVAC, Plumping BIM based Cost Estimation BIM based Clash Detection for Design Coordination 4D Scheduling & Construction Sequence Simulation
BIM 3D Modeling -Architectural
BIM 3D Modeling - Structural
BIM 3D Modeling - HVAC
BIM 3D Modeling - Plumping
BIM based Cost Estimation
General Requirement / WBS
3D Model with Database
Quantity Takeoff
Result of Cost Estimation
Optimization and completing Cost Estimation
Quantity Takeoff / Schedule
Pricing
BIM based Clash Detection for Design Coordination
Architectural
Clash Report
Structure
M&E
4D Scheduling & Construction Sequence Simulation
Gantt Chart Schedule
Production Calculation
Construction Sequence Simulation
Contact
Willa Chu
BIM Management Student at George Brown College Bachelor’s degree in Construction Management
cyiw1993@gmail.com +1 437 987 7014 Toronto, Canada
www.linkedin.com/in/willac
Sydney Opera House in Revit