20190520 Portfolio Guillermo García

Page 1

Portfolio Guillermo GarcĂ­a

+(51) 986 860 633 / +(34) 609 84 73 09 guillermo.garcia@arup.com UKDT Lima 2019 PanAm Games office - Arup

Portfolio Info Year Projects Pages

2019 13 70

Professional Project List Lima PanAm Games 2019, Lima Barclays Relocation Offices, Madrid Andorra Els Falguero, Andorra Adunia Restaurant, Madrid Bamboo Forest. Gallery MA Pavilion, Tokyo Private House, Ho Chi Minh City FPT University, Ho Chi Minh City Sherman Contempary Art Foundation, Sydney Diamond Island Community Hall, Ho Chi Minh City Student Project List From the house to the city, Paris Communitis Natura, Cabo de Gata International Wildcare Center, Kruger National Park Nursery in Rembrandtplein, Amsterdam Awards and Publications


Guillermo is part of the Arup Design Team assigned in Lima, Peru, as well as the Project Management team in Spain. His main functions in Lima (LTA finishing in September 2019) include all RIBA stages 0 to 7, as a consultant on two of the venues that will be part of Lima PanAm Games 2019.

Guillermo García Architect (BSc. + MSc.) Project Manager

Education MSc. in Project Management (PMP Certified in 2019) Universidad Politécnica de Madrid BSc + MSc. in Architecture Superior Technical School of Architecture of Madrid (Etsam, UPM)

Achievement of high grades in Geometry and Differential calculus applied in Architecture.

Green Practice and Future City Diploma Tongji University, Shanghai, China.

International Student Scholarship to participate in researches and practices.

Parametric Architecture In agreement with The Barlett University of London, Madrid. Rhinoceros + Grasshopper3d, conducted by Frikearq. Science Bachelor

Completed with Honors (9,9/10) Nuestra Señora de La Merced, Madrid.

2

In Madrid, his main functions include Project Management, Technical Assessment, life-cycle assessment (LCC) and BIM Assistance Management. During his career, Guillermo has worked in several parts of the world, including Vietnam, China, and Europe. Experienced in working with local standards and cultures, he is able to work from the small to the large scale projects in all phases from design to construction. His ability to mix aesthetics and management gives a holistic point of view to every project, not losing the sight of the project with the city and every client´s needs.

Publications & Recognitions First Prize Madrid at Pladur National Competition for an Interpretation Centre of Nature and Plantation Research in Cabo de Gata, Spain.

Skills Proficiency in: - Revit - InDesign - Illustrator - Photoshop - Autocad

First Accesit at 12th Cátedra Blanca National Competition - F. Advanced in: J.S.Oíza for a Nursery School in - Rhinoceros + Grasshopper Rembrandtplein (Amsterdam). - 3ds Max + Vray Most innovative and sustainable - Google Sketchup + Vray design Tongji University 2014, - Presto (Cost Management) reactivating Shikumen neibourg- - Primavera hood in Shanghai.


CONCURS D’IDEES

COMPLEX MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA

Lima 2019 Pan Am Games

Barclays. Office Relocation

Andorra els falguero

Lima

Madrid

Andorra

Pag. 04

Pg. 8

Pg. 10

Adunia Restaurant

Bamboo Forest

Private House

Madrid

Gallery MA Pavilio, Tokyo

Ho Chi Minh City

Pg. 14

Pg. 18

Pg. 22

FPT University

Green Ladder

Ho Chi Minh City

Sydney

Pg. 26

Pg. 28

INTERNATIONAL A R Q U I D E AS S T U D E N T COMPETITION

NOVEMBRE 2016 | 2

Diamond Island Community Hall

Ho Chi Minh City t h e p rog r a m con s i s t s of a n Pg. 34 in t e rn at ion a l wil d c are c e n t e r located in kruger national park (southafrica).

the dream consists of a community. a place where tourist and scientists can help each others.

integrated with the local materials P L A D U R N A T I O N A L and developing a sustainable design, STUDENT COMPETITION the project flows like a big platform i would want to create the most over the ground, where species will beautiful possible space that dignifies feel more natural when treated, but the pleasant landscape of cabo de covered with the wooden structures.

gata (spain) . the most luminous space, meanwhile the platform provides the easier to understand and to use. i p e o p l e a s c e n a r i o to s h a imagine re, it like a stone, carved with communicate and live.

care, the sun would shine.

a piazza of piazzas. the outside inside,

FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM MARZO 2017

AULA PFC ARANGUREN

TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN

GUILLERMO GARCÍA ARROYO 08168

From the house to the city

Communitis Natura

Paris

Cabo de Gata

Pg. 40

Pg. 52

w h e r e e a c h v i s i t wo u l d b e celebrated. a great translucent skeleton, with a clear glass skin . the great skeleton, stell frame and covered with drywall, hoste ss WIldcare Centre facilities and International articulates the space . direct lighting would entry and Kruger National Park flow around our space, compact and flexible , understandable and easy , Pg. 56 carved and beautiful.

3


Lima 2019 Pan-Am Games As part of the government-to-government agreement between Peru and United Kingdom, Arup is committed to provide technical assistance to guarantee the successful delivery of the Games. Guillermo’s role is giving temporary and permanent infrastructure technical assurance. As part of the Overlay team, he is designing and coordinating the Games operation on Punta Rocas Complex (Second High Performance Center for Surf in the World and first Public one) and Lunahuana (Canoe Slalom and Extreme Slalom) venues. Involved in all RIBA stages 0 to 7, from the initial stages, concept design to procurement, overseeing construction and finally site management during games time in July / August 2019. As part of the challenges faced, Guillermo, despite being his first games, has been able to adapt to a constantly changing work environment, elaborating dozens of Overlay Book revisions: •

25 complete updates of operational packages for four different venues

Deep understanding and lessons learned, saving 70% of unnecessary overlay commodities, thanks

to an enriched multidisciplinary and collaborative approach towards the use of spaces. •

Design management on one of the most important live venues, enhancing experience and sightlines

for spectators, allowing more spectators to attend the event, as well as improving both crowd and Functional Areas flow. •

Deep understanding on Surf, Canoe Slalom, Extreme Slalom, Modern Pentathlon, Powerlifting,

Rugby and Baseball competitions, specially on sports competition, common domain use of space, live and ENG broadcasting, security, and spectator flow matters. Type: Major Event Client: Lima 2019 / COPAL Location: Lima, Peru Date: 2017-2019

4


A3 (420x297) E1:500 DESCRIPCION DESCRIPTION

COLOMBIA

CAMPO DE JUEGO FIELD OF PLAY ATLETAS ATHETES

 

1 ANCASH

  

ECUADOR

  

OFICIALES TECNICOS TECHNICAL OFFICIALS BROADCAST TRANSMISIONES

 

   

PRENSA PRESS

 

FAMILIA / JUEGOS GAMES FAMILY

 

ESPONSOR SPONSOR OPERACIONES OPERATIONS

    

 

SEGURIDAD SECURITY TRANSPORTE TRANSPORT

 

LIMA

 

BRASIL

CEREMONIAS CEREMONIES SERVICIO ESPECTADORES SPECTATORS SERVICE

  

ESPECTADORES SPECTATORS ESPACIO TECNICOS TECNICAL SPACES

VILLA DEPORTIVA

 

2

 

ESPACIO NO DISPONIBLE SPACE NOT AVAILABLE

M NA PA

VALLAS DE SEGURIDAD/ S

NA ICA ER

3

VALLAS ALTAS HIGH FENCE

4

VALLAS BAJAS LOW FENCE PERIMETRO DE SEGURIDAD SAFETY PERIMETER

5

LOCALIZACIÓN

REVISIO

DATE

REVIEW

27/03/2018

P.M.H.V.

01

28/06/2018

P.M.H.V.

02

29/08/2018

P.M.H.V.

03

12/10/2018

P.M.H.V.

04

18/12/2018

P.M.H.V.

00

ICA

INFRAESTRUCTURA TEMPORAL

ESC.1/1:50000

N

OCEANO PACIFICO

FECHA

BOLIVIA

REVISION / APROBACIÓN REVIEW / APPROVAL

CHILE

PERCY MIGUEL HUAMÁN VÁSQ CAP N°7667

UCT U TR R

.

V.B

R

A

L

A

F RA IN E

ARQ. PERCY H CAP N°7

S

T

O

E M P

ROBERTO VON TORRES CIP N°27376

360 M

ING. ROBERTO V CIP N°27 ENTIDAD/ ENTITY

13

5M

5M

26

TA

UN

P YA LA A P AS DA ROC

RA

T EN

FOP1.10: SHORTBOARD LONGBOARD SUP

UBICACIÓN KEY PLAN

FOP1.20: SUP RACE PL

AY

AP

UN

TA

RO

CA

S

OCEANO PACIFICO

BUJAMA - LBU

4

LUNAHUANA - LUN

5

PARACAS - YCP

SCOREBOARD VIDEOBOARD

Competencia

Entrenamiento

EVS1.07 

EVS31.00 

SPP7.01 

BRD5.00

EVS32.00





CAMIONES HB

DOP33.00 

PRS31.00 

BRD1.12

PRS30.00 

TEC1.00 RADIOFRECUENCY TEC7.00 TOWER  (EN CUBIERTA) 

FO

 P6  .0  0 

PISCINA

BRD1.13 BRD3.00 

PR  S2  .00  

VEO1.00 

MED33.00







DESCRIPTIO

P.M.H.V.

28/06/2018

P.M.H.V.

OVERLAY BOOK

02

29/08/2018

P.M.H.V.

FOR DT ASSEMB

03

12/10/2018

P.M.H.V.

OVERLAY BOOK

04

18/12/2018

P.M.H.V.

OVERLAY BOOK

OVERLAY BOOK

FIRMA SUBSCRIPTION

INFRAESTRUCTURA TEMPORAL

TEC30.00 REVISION / APROBACIÓN TEC31.00 REVIEW / APPROVAL PERCY MIGUEL HUAMÁN VÁSQUEZ TEC33.00 CAP N°7667 MED33.00 

ARQ. PERCY HUAMÁN CAP N°7667

S

UCT U TR R

.

V.B

R

T

SPO30.00 SPO31.00 SPO32.00 

SPO1.00

DESCRIPCIO

REVIEW

27/03/2018

01

F RA IN E





MED4.00

BRM3.00 





REVISION

DATE

00



SPO33.00



CAT3.00

FECHA



.00 S2  SP  

BRD5.00 

PERCY MIGUEL HUAMÁN V

PERIMETRO DE SEGURIDAD SAFETY PERIMETER







SPO33.00

MED4.00

S

P  P7  .0  1 



DIR. TEC. COMP.

S

P  O5  .05 

VALLAS BAJAS LOW FENCE

TEC10.00

VEO2.00

MED33.00



SPO3.03



0

DEVELOPED BY

A

 T4 .01  .0  2 

SPO3.00



.00 D3  ME

 S4  .0 



C CA AT4

T

E  C5  .0  0 

PR

SPO33.00

SPO3.02 CAT3.00

SPO4.05

P P RT3 PR RT3 0.0  T3 1.0 0  2.0 0  0 

SPO3.05

PR

 T1  .0  0 

VALLAS ALTAS HIGH FENCE



PR

MED4.00

PR

BD



TEC3.00 



 R4  .0  0 

DETAILED D

ESPACIO NO DISPONIBLE SPACE NOT AVAILABLE

DOP8.00



BRD1.00

PR  T1  .02 

STATUS OF PROJECT

VALLAS DE SEGURIDAD/ SECURITY FENCES



T  1.0  0 

LOCATION

ESPECTADORES SPECTATORS ESPACIO TECNICOS TECNICAL SPACES

BRD6.00



SU - SU TITULO DE LAMINA

STATUS DEL PROYECTO

CEREMONIAS NOMBRE DEL ARCHIVO CEREMONIES FILE NAME SERVICIO ESPECTADORES E-PRO-OVL-LIM-AR-G-SU-PL SPECTATORS SERVICE

PRS3.00



 S1  .0  0 

100

PRO - PUNTA

DRAWING TITLE

SEGURIDAD SECURITY TRANSPORTE TRANSPORT



FO

75

SPORT / DISCIPLINE

ESPONSOR SPONSOR OPERACIONES OPERATIONS

EVS30.00

 P7  .00  

50

DEPORTE / DISCIPLINA

FAMILIA / JUEGOS GAMES FAMILY

SPO31.00 

SPO30.00 

25

VENUE

EL PROYECTO DE LEGADO ESTÁ SUFRIENDO ALTERACIONES. EL PROYECTO DE OVERLAY DEBERÁ SER ADAPTADO AL NUEVO PRENSA LAYOUT TAN PRONTO COMO SEA RECIBIDO. PRESS

MED2.00 28/07/2019 - 04/08//2019 MED1.00 28/07/2019 - 04/08/2019

640

0m

INSTALACIÓN

OFICIALES TECNICOS TECHNICAL OFFICIALS BROADCAST TRANSMISIONES

RB VANs

SPS1.00 

3

BR  D2  .0  0 

Butacas temporales

1:5000@A

GRAPHIC SCALE

CAMPO DE JUEGO FIELD OF PLAY ATLETAS ATHETES

NOTAS

L

PUNTA ROCAS - PRO

640

FECHAS PRELIMINARES

A

HUACHO - AMM

2

Butacas fijas

88 Atletas

Km 75 Panamericana Sur , Lima - 1 hora de Lima

Surf - SU

AFORO



1

CUOTA DE DEPORTISTAS

BRD1.08

CLUSTER 'E' - SEDES

UBICACIÓN

ESCALA GRAFICA

DESCRIPCION DESCRIPTION

GRUPO ELECT.

DEPORTES

O

E M P

ROBERTO VON TORRES CIP N°27376

ING. ROBERTO VON TORRES CIP N°27376 ENTIDAD/ ENTITY

P

R  S4.0  0 

FOP1.00

UBICACIÓN KEY PLAN

BRD5.00 

PRS4

TEC12.00



1. LOS MUEBLES PRESENTADOS EN ESTE DIBUJO SON PARA REFERENCIA ESPACIAL SOLAMENTE. FF & E (MUEBLES, ACCESORIOS Y EQUIPOS) Y REQUISITOS DE TECNOLOGÍA A SER PROPORCIONADOS POR AFS DE LOGÍSTICA Y TECNOLOGÍA Y SERÁN REPRESENTADOS EN EL OVERLAY BOOK 4. 2. EL DISENO DE LAS RAMPAS Y ESCALERAS TEMPORALES MOSTRADAS EN ESTE DIBUJO ES SOLAMENTE INDICATIVO. EL DISENO SE DESARROLLARA CUANDO SE OBTENGA MAYOR INFORMACION ACERCA DE LA TOPOGRAFIA EXISTENTE Y OTROS FACTORES QUE INFLUYAN EN LAS CARACTERISTICAS DE ESTOS ELEMENTOS 3. LA DOTACIÓN PARA SERVICIOS HIGIÉNICOS ES REFERENCIAL. LA CIFRA FINAL DEBERÁ SER COORDINADA Y CONFIRMADA ENTRE EL CONTRATISTA Y LIMA2019. 4. EL PROYECTO DE LEGADO ESTÁ SUFRIENDO ALTERACIONES. EL PROYECTO DE OVERLAY DEBERÁ SER ADAPTADO AL NUEVO LAYOUT TAN PRONTO COMO SEA RECIBIDO.

PLAYA

PUNTA

.00





1. THE FURNITURE PRESENTED IN THIS DRAWING IS FOR SPACE REFERENCE ONLY. FF&E (FURNITURE, FITTINGS & EQUIPMENT) AND TECHNOLOGY REQUIREMENTS TO BE PROVIDED BY LOGISTICS AND TECHNOLOGY FAS AND WILL BE REPRESENTED IN OVERLAY BOOK 4. 2. THE DESIGN OF THE RAMPS AND TEMPORARY STAIRS SHOWN IN THIS DRAWING IS ONLY INDICATIVE. THE DESIGN WILL BE DEVELOPED WHEN MORE INFORMATION IS OBTAINED ABOUT THE EXISTING TOPOGRAPHY AND OTHER FACTORS THAT INFLUENCE THE CHARACTERISTICS OF THESE ELEMENTS. 3. THE NUMBER OF TOILET FACILITIES AS ILLUSTRATED SERVES AS A REFERENCE ONLY. FINAL NUMBERS OF TOILET FACILITIES TO BE COORDINATED AND CONFIRMED BY CONTRACTOR AND LIMA2019. 4. THE LEGACY PROJECT IS SUFFERING SEVERAL CHANGES. OVERLAY PROJECT TO ADAPT ITS DESIGN TO THE NEW LAYOUT AS SOON AS THE LEGACY PROJECT IS RECEIVED.

FOP2.02

ROCAS



SPO5.88 

ESCALA GRAFICA

1:500@A3

GRAPHIC SCALE 0m

2

4

6

8

10

INSTALACIÓN VENUE

PRO - PUNTA ROCAS

DEPORTE / DISCIPLINA SPORT / DISCIPLINE

FOP1.00

SU - SURF TITULO DE LAMINA

DRAWING TITLE

ENLARGED PLAN STATUS DEL PROYECTO STATUS OF PROJECT

DETAILED DESIGN NOMBRE DEL ARCHIVO FILE NAME

E-PRO-OVL-LIM-AR-G-SU-PLN-L013000

OCEANO PACIFICO

DEVELOPED BY

PERCY MIGUEL HUAMÁN VÁSQUEZ

5

REV

0

FECH DATE

18/12/


ENTRADA ENTRY

DESCRIPCION DESCRIPTION

CAMPO DE JUEGO FIELD OF PLAY ATLETAS ATHETES

DESCRIPCION DESCRIPTION

FF&E SHOWN ON PLAN IS FOR ILLUSTRATION PURPOSES TO DESCRIBE THE LAYOUT OF THE TECHNICAL TABLES. FF&E TO BE PROVIDED BY LOGISTICS & TECHNOLOGY. TODO FF&E MOSTRADO EN EL PLANO ES MERAMENTE ILUSTRATIVO PARA EL DISEÑO DE LAS MESAS TÉCNICAS. FF&E SERÁ PROVISTO POR LOGÍSTICA.

PRENSA PRESS

ATLETAS ATHETES OFICIALES TECNICOS TECHNICAL OFFICIALS

FAMILIA / JUEGOS GAMES FAMILY ESPONSOR SPONSOR OPERACIONES OPERATIONS SEGURIDAD SECURITY TRANSPORTE TRANSPORT

BROADCAST TRANSMISIONES

ZONAS MIXTAS: BRD Y PRS PODIO

CEREMONIAS CEREMONIES SERVICIO ESPECTADORES SPECTATORS SERVICE ESPECTADORES SPECTATORS

PRENSA PRESS FAMILIA / JUEGOS GAMES FAMILY

OVR  SPORT PRESENTATION  MESAS TECNICAS 

CUARTO CONTROL CRONOMETRAJE

CRONOMETRAJE Y PUNTUACION





VALLAS DE SEGURIDAD/ SECURITY FENCES VALLAS ALTAS HIGH FENCE VALLAS BAJAS LOW FENCE PERIMETRO DE SEGURIDAD SAFETY PERIMETER

TRANSPORTE TRANSPORT CEREMONIAS CEREMONIES

GANTRY (FINISH LINE)

+0.00

ESPACIO TECNICOS TECNICAL SPACES ESPACIO NO DISPONIBLE SPACE NOT AVAILABLE

ESPONSOR SPONSOR OPERACIONES OPERATIONS SEGURIDAD SECURITY

SALA DE ULTIMA LLAMADA

SERVICIO ESPECTADORES SPECTATORS SERVICE



ENTRADA ENTRY

OFICIALES TECNICOS TECHNICAL OFFICIALS BROADCAST TRANSMISIONES

CAMPO DE JUEGO FIELD OF PLAY SPORT PRESENTATION

FECHA

REVISION

00

12/10/2018

P.M.H.V.

OVERLAY BOOK 3

01

18/12/2018

P.M.H.V.

OVERLAY BOOK 3

DATE

DESCRIPCION

REVIEW

DESCRIPTION

FIRMA SUBSCRIPTION

INFRAESTRUCTURA TEMPORAL

ESPECTADORES SPECTATORS ESPACIO TECNICOS PLAYA PUNT TECNICAL SPACES A ROCA

REVISION / APROBACIÓN REVIEW / APPROVAL

PERCY MIGUEL HUAMÁN VÁSQUEZ CAP N°7667

S

ESPACIO NO DISPONIBLE SPACE NOT AVAILABLE

ARQ. PERCY HUAMÁN CAP N°7667

SERV. MÉDICOS ATLETAS S

.

RUCTU

T

V.B

R

A

L

A

FRA I N E

R

VALLAS DE SEGURIDAD/ SECURITY FENCES

Seccion 1

FOP1.10 SHORTBOARD LONGBOARD SUP SURF

CORTE A-A

-12.20

VALLAS ALTAS HIGH FENCE

Focus Point

CIP N°27376

ING. ROBERTO VON TORRES CIP N°27376

PERIMETRO DE SEGURIDAD SAFETY PERIMETER

FOP1.20 SUP RACE

O

E M P

ROBERTO VON TORRES

VALLAS BAJAS LOW FENCE

Esc.: 1/400

Focus Point

T

ENTIDAD/ ENTITY

REVISION

FECHA

00

12/10/2018

P.M.H.V.

01

18/12/2018

P.M.H.V.

02

21/01/2019

P.M.H.V.

DATE

DESCRIPCION

REVIEW

DESCRIPTION

OVERLAY BOOK 3 OVERLAY BOOK 3 UBICACIÓN KEY PLAN

OVERLAY BOOK 3

FIRMA SUBSCRIPTION

INFRAESTRUCTURA TEMPORAL REVISION / APROBACIÓN REVIEW / APPROVAL

PERCY MIGUEL HUAMÁN VÁSQUEZ CAP N°7667

RETRANSMISION COMENTARISTAS

ESCALA GRAFICA

N

1:1500@A3

GRAPHIC SCALE

ARQ. PERCY HUAMÁN CAP N°7667 INSTALACIÓN PRO - PUNTA ROCAS

FRA I N E

.

V.B

6

8

TITULO DE LAMINA

DRAWING TITLE

L

FOP DIAGRAM STATUS DEL PROYECTO STATUS OF PROJECT

A

OCEANO PACIFICO

E M P

10

SU - SURF

DETAILED DESIGN NOMBRE DEL ARCHIVO

R

T

ESPECTADORES

4

SPORT / DISCIPLINE

A

PRENSA - POSICIONES SIN MESA FF&E SHOWN ON PLAN IS FOR ILLUSTRATION PURPOSES TO DESCRIBE THE LAYOUT OF THE TECHNICAL TABLES. FF&E TO BE PROVIDED BY LOGISTICS & TECHNOLOGY. TODO FF&E MOSTRADO EN EL PLANO ES MERAMENTE ILUSTRATIVO PARA EL DISEÑO DE LAS MESAS TÉCNICAS. FF&E SERÁ PROVISTO POR LOGÍSTICA.

2

VENUE

DEPORTE / DISCIPLINA

R

S

0m

UCT U TR

O

REV

FILE NAME

01

E-PRO-OVL-LIM-AR-G-SU-FOP-ZZZ4000

FECHA DATE

DEVELOPED BY

PERCY MIGUEL HUAMÁN VÁSQUEZ

+12.35

18/12/2018

ROBERTO VON TORRES CIP N°27376

ENTRADA ENTRY

DESCRIPCION DESCRIPTION

CAMPO DE JUEGO FIELD OF PLAY

Productor

P2

Operador de audio

P3

Vision mixer

P4

Operador gráfico

Delegado Técnico Internacional

P5

Asistente de Producción

S10 Tabulador S11 Anunciador de Olas

T1

Aún por confirmar

T2

Aún por confirmar

+6.80 T3

Aún por confirmar

T4

ZONA MIXTA

P1

Juez de Jueces Juez de Competición

S9

TECHNOLOGY

T5

Aún por confirmar Aún por confirmar

T7

Aún por confirmar

T8

+7.85

P6

Anunciador (Inglés)

P7

Anunciador (Español)

P8

Operador de cámara

P9

Manager de piso

PRENSA PRESS

FAMILIA / JUEGOS GAMES FAMILY ESPONSOR SPONSOR

FOP2.00 

S11

BRD5.00 

S7

FOP2.00

S12

OPERACIONES OPERATIONS SEGURIDAD SECURITY TRANSPORTE TRANSPORT CEREMONIAS CEREMONIES



S1 S2 S3 S4 S5 S6 S7 S8 S9 S10

SERVICIO ESPECTADORES SPECTATORS SERVICE

VIDEO REVIEW

ESPECTADORES SPECTATORS ESPACIO TECNICOS TECNICAL SPACES ESPACIO NO DISPONIBLE SPACE NOT AVAILABLE

MED3.00

PRT30.00 PRT31.00 PRT32.00

VALLAS DE SEGURIDAD/ SECURITY FENCES





VALLAS ALTAS HIGH FENCE

SPS2.00

VALLAS BAJAS LOW FENCE



Aún por confirmar

T6

BROADCAST TRANSMISIONES

ENTIDAD/ ENTITY

OF.PROT.

ESPECTADORES

Juez de Prioridad

S8

S7

SALA DE TO´s



SPORTS PRESENTATION

S1-S5 Oficiales técnicos S6

ING. ROBERTO VON TORRES CIP N°27376 ATLETAS ATHETES OFICIALES TECNICOS TECHNICAL OFFICIALS

SPO30.00 SPO31.00

FOP Schedule SPORTS

PRT1.00

PRT1.00





PERIMETRO DE SEGURIDAD SAFETY PERIMETER

CAT4.01 CAT4.02

+6.80



P6

UBICACIÓN KEY PLAN

DATE

SPP7.01





P1 P2

DESCRIPCION

REVIEW

DESCRIPTION

00

12/10/2018

P.M.H.V.

OVERLAY BOOK 3

01

18/12/2018

P.M.H.V.

OVERLAY BOOK 3

P7

TEC5.00

REVISION

FECHA

PRS1.00  FIRMA SUBSCRIPTION

INFRAESTRUCTURA TEMPORAL

P3 P4

REVISION / APROBACIÓN REVIEW / APPROVAL

Aún por confirmar

PERCY MIGUEL HUAMÁN VÁSQUEZ CAP N°7667

PRS31.00 SPP31.00 BRD31.00 PRT31.00  VEST. ATLETAS 

ARQ. PERCY HUAMÁN CAP N°7667

SPP7.01

SPO5.44

SPO5.44





R

A

G2

L

FRA I N E

G2

O

E M P

ROBERTO VON TORRES CIP N°27376

LAV. WETSUITS SEC. WETSUITS

PRS1.00

ING. ROBERTO VON TORRES CIP N°27376





ENTIDAD/ ENTITY

SPO5.44

LOUNGE ATLETAS

P5 P8 P9





CONTROL EQUIP. DEPORTIVO 

SCOREBOARD VIDEOBOARD

ESCALA GRAFICA

1:125@A3

GRAPHIC SCALE

+0.00

G2

T

ALMACÉN WETSUITS



+1.85

V.B

S

BDR5.00

.

UCT U TR

A

PRT5.00 

SPO30.00 SPO31.00 SPO32.00 

R

SPORT INFO

PRS30.00 SPP30.00 BRD30.00 PRT30.00 

BDR5.00

FOP6.00



0m



UBICACIÓN KEY PLAN

1

2

3

4

5

INSTALACIÓN

FOP7.00

VENUE



PRO - PUNTA ROCAS 6

5

4

3

2

DEPORTE / DISCIPLINA

1

SPORT / DISCIPLINE

SU - SURF PRS1.00 

TITULO DE LAMINA

BRD4.00

DRAWING TITLE



CORTE AA´

SPO5.05 PRS4.00

PRS4.00

STATUS DEL PROYECTO





STATUS OF PROJECT



Seccion 1 Esc.: 1/125

NOMBRE DEL ARCHIVO FILE NAME

S

A ROCA

PLAYA

FF&E SHOWN ON PLAN IS FOR ILLUSTRATION PURPOSES TO DESCRIBE THE LAYOUT OF THE TECHNICAL TABLES. FF&E TO BE PROVIDED BY LOGISTICS & TECHNOLOGY. TODO FF&E MOSTRADO EN EL PLANO ES MERAMENTE ILUSTRATIVO PARA EL DISEÑO DE LAS MESAS TÉCNICAS. FF&E SERÁ PROVISTO POR LOGÍSTICA.

6

ESCALA GRAFICA GRAPHIC SCALE 0m

1

2

3

N

1:250@A3 4

5

INSTALACIÓN VENUE

PRO - PUNTA ROCAS DETAILED DESIGN DEPORTE / DISCIPLINA

BDR5.00 

PUNT

SPORT / DISCIPLINE

TITULO DE LAMINA

SU - SURF REV

DRAWING TITLE

02 E-PRO-OVL-LIM-AR-G-SU-STN-ZZZ7000 STATUS DEL PROYECTO

FOP MULTILEVEL PLAN

STATUS OF PROJECT

FECHA

DETAILED DESIGN

DEVELOPED BY

NOMBRE DEL ARCHIVO DATE FILE NAME

E-PRO-OVL-LIM-AR-G-SU-FOP-MTL4000 21/01/2019

FOP1.10 PERCY MIGUEL HUAMÁN VÁSQUEZ

DEVELOPED BY

PERCY MIGUEL HUAMÁN VÁSQUEZ

REV

01 FECHA DATE

18/12/2018


7


Barclays PM & CM Consultancy Services Project and Cost Management to relocate Barclays to a new site with an area estimated at 2,000 sqm, called Project Columbus. Barclays is intending to certify the Project as LEED Gold. As part of the scope, Guillermo was part of an

branding opportunities, MEP, daylight, cooling and fresh air capacities available, power, generator support, diverse IT routes through the buildings, security, etc. Furthermore, it also included management of contracts and value engineering report cost studies.

entire year project process, with two different stages.

Stage 2. Full Fit Out. Involving design,

and

procurement (Award and Contract sign off for Stage 1. Consisting on due diligence reports

final long lead package and for trade package).

and outline scheme designs, with cost plan, program and test fits.

All these stages were of high value to Guillermo,

Part of the information to be assessed was

as he was able to deal on a daily basis with

Architecture, refurbishments, landmark and

many stakeholders, learning how to deal with demanding deadlines.

Type: Commercial Client: Barclays Location: Madrid, Spain Date: 2017

8


9


Type: Residental & Commercial Client: Reig Capital Location: Els Falguero, Andorra Date: 2016

Els Falguerรณ Mixed use, ARUP+OAB Project Management service for a 37,000 sqm hotel and apartments building and a 13,700 sqm office building in Andorra la Vella, Andorra. Arup provided consultancy services in sustainability, faรงade design and fire protection as well as Project Management in this competition. Guillermo was part of the competition team for a multipurpose center in a very constrained location, marked by adverse weather conditions, and an entire facade facing north to a cliff. Being part of a multidisciplinary team the focus of the project was holistic, so all the different disciplines were involved in all stages. This enabled Guillermo to participate in design management meetings with OAB, to find solutions to the design of two large volumes, their circulation, layouts, and better ways to enhance a bigger portfolio of different spaces to be sold by the client in the future.

10


UN MON A L’INTERIOR El tret principal del solar es caracteritza per la seva forma allargada alternant les sortides cap al carrer amb el retrocés a la muntanya, provocant un diàleg amb la muntanya de forma intermitent. Així es generen dos grans espais oberts de llum que arriben fins als dos patis on s’ubica el gimnàs i l’spa. Proposem instal·lar un gran mur vegetal de gran bellesa que arribaria a les cotes més baixes del edifici.

restaurant, locals comercials, etc; els soterranis a usos propis del servei de l’hotel; les plantes pis ubiquen les habitacions i l’última planta molt més lúdica s’hi situa el skybar. L’hotel està connectat verticalment principalment per dos nuclis d’escales i ascensors seguint les normatives d’incendis més exigents diferenciant els nuclis dels clients i els nuclis de serveis.

connector entre les dues funcions ben diferenciades, l’hotelera i la residencial.

El programa del projecte respon a la tipologia d’hotel de 5 estrelles Gran Luxe. A trets generals, les plantes a nivell es destinen als usos més públics de recepció,

L’Hotel comparteix amb els Apartaments un dels espais que requereix una superfície més elevada, el gimnàs/spa. Aquest actua com a ròtula i element

mirador a la plaça pública del ROC.

En planta tercera hi trobem l’accés al SPA, les sales de reunions i esdeveniments i les residències que contenen una superfície inferior. La circulacions, ben estudiades, per evitar el creuament entre clients de l’Hotel i els residents dels apartaments. En aquesta planta elevada hi trobem el bar i la seva terrassa que actua com a

CONCURS D’IDEES

NOVEMBRE 2016 | 2

COMPLEX SECTORMULTIFUNCIONAL B ESTUDIS DE FAÇANES AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA

PANELAT FUSTA

PAVIMENT PEDRA

VIDRE

PAVIMENTS FUSTA

LLAUTÓ DAURAT

FUSTA FAÇANA

Època freda (dia)

MÒDULS FAÇANA EDUFICI PARCEL·LA 5

Època freda (nit)

MÒDULS FAÇANA EDIFICI PARCEL·LA 4 Època càlida (dia)

Època càlida (nit)

ALÇAT SECTOR B

MÒDULS FAÇANA EDIFICI PARCEL·LA 6 ESTUDI DE VISUALS I IMPACTE VOLUMÈTRIC La proposta aconsegueix maximitzar i privatitzar les visuals de cada una de les diferents habitacions i apartaments. S’ha posat especial atenció en els edificis (Sector B) de les parcel·les 4,5,6 per tal d’evitar i entrar en conflicte amb les visuals de les estàncies de l’Hotel i de les Residències situat en la parcel·la contigua. Per tant les dues propostes dialoguen entre si mitjançant

la intimitat del espai interior. -Forma ameboide de la proposta, mai arbitraria, respon a la intenció de creació de nous recorreguts públics i a l’afavoriment de les vistes del edifici HOTEL /APARTAMENTS situat en les parcel·les 1, 2, 3, -Deixem lliure i recuperem l’espai que envolta el Roc i la Clínica dotant de

les seves formes per tal emfatitzar les seves virtuts sense, en cap cas, malmetre

valor el seu entorn.

IMATGE SPA

CONCURS D’IDEES

-La disposició orgànica de la planta i l’àmbit d’afectació dels recorreguts origina la creació d’un gran espai central semiobert i protegit que es converteix en un nou Atri comercial on poder visualitzar el Roc i el nou espai públic que es crea al seu voltant

ESTUDI DE FAÇANA. MODULARITAT SEGONS ORIENTACIÓ El tractament de les façanes dels nous edificis es confia al sistema constructiu de prefabricats, permetent així la modularitat, que consisteix en fer els tancaments de façana amb dues pells: una interna de vidre i una externa formada per lames verticals de fusta, de manera que fan l’efecte d’una cortina i semblen ingràvides. Les lames verticals augmenten la seva densitat en aquelles façanes que ho necessitin. Degut a factors climàtics, la seva transparència i d’orientació es deixen quasi bé sense elles allà on no es requereixi. La pell de vidre d’aquest edificis, provoca un augment de la sensació d’amplitud dels vianants, doncs ens trobem en una secció del carrer on els edificis veïns són molt propers.

IMATGE PENTHOUSE IMATGE DESDE PLANTA SEGONA CAP AL PATI CENTRAL

COMPLEXCOMPLEX MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA CONCURS D’IDEES

IMATGE CANTONADA HOTEL I OFICINES IMATGE DES DE ATRI D’ACCÉS

NOVEMBRE 2016 | 7 NOVEMBRE 2016 | 10

11


P1

P2

P3

Per la via principal hi trobem els accessos “peatonals” als diferents nuclis de comunicació de les residències com també els accessos rodats privats,

En planta segona, la que es troba al mateix nivell de la rotonda superior, hi trobem el programa següent: el Lobby d’entrada a l’Hotel, la recepció,

En planta tercera hi trobem l’accés al SPA, les sales de reunions i esdeveniments i les residències que contenen una superfície inferior. La circulacions,

per entrar mercaderies i provisions etc.

el restaurant principal, la cuina, el vestíbul d’ascensors i altres cambres de serveis. En aquesta planta també hi trobem l’entrada al gimnàs, una

ben estudiades, per evitar el creuament entre clients de l’Hotel i els residents dels apartaments. En aquesta planta elevada hi trobem el bar i la seva

superfícies que ens ajuda a connectar el programa hoteler amb el programa de les residències. A l’hotel hi podem accedir per dos punts i per dos

terrassa que actua com a mirador a la plaça pública del ROC.

En planta 1(nivell +1.049.50/+1.051,5) 1 ubica, cuina principal, càmeres frigorífiques i altres serveis associats a aquest ús; vestidors de personal, menjador de personal, despatxos del xef i governanta; zona de càrrega i descàrrega i control d’entrada de mercaderies.

nivells. L’Hotel comparteix amb els Apartaments un dels espais que requereix una superfície més elevada, el GIMNÀS/SPA. Aquest actua com a ròtula i

La planta primera té un altell (+1052,50) en el qual s’hi ubica un espai (MEP) 350 m² on es situen la gran part de les instal·lacions d’ús exclusiu de

element connector entre les dues funcions ben diferenciades, l’hotelera i la residencial.

l’Hotel

És important destacar l’accés rodat dels clients de l’hotel. Aprofitant l’existència de la rotonda hi ubiquem l’entrada al pàrquing mitjançant una

A la planta soterrani -1,-2,-3 s’hi destinen espais per a ubicació del aparcaments i espais destinats a les instal·lacions.

rampa helicoïdal.

A la planta soterrani -1,-2,-3 s’hi destinen espais per a ubicació del aparcaments i espais destinats a les instal·lacions.

1

4

3

6 5

5

7

4 3

6

2 5

2

6

7

9

3

7 8

10

8 16

1

1 9

11

10

13

11 4

2

7

12 13

12 14 17

8

14

13 9 15 15 8

15 13

17 12

21 13

20

16

13 20

1. MOLL CARGA/DESCARGA 103.60 M² 2. OFICINA DE GESTIÓ/COMPRES 27.10 3. CUINA PRINCIPAL 187 M² 4. TRACTAMENT DE RESIDUS 52.30 M² 5. MAGATZEM MENJAR/BEGUDES 87.30M² 6. MAGATZEM CUINA 66 M² 7. TECNOLOGIA DE L’INFORMACIÓ 22.8 M² 8. NUCLI DE COMUNICACIÓ 26.10 M² 9. ACCÉS A HOTEL CLIENTS PER COTA CARRER +1.050 10. ADMINISTRACIÓ DE DADES 29.40 11. VESTUARIS PERSONAL 40.60 M² 12. ACCÉS RESIDENCIES/PENHOUSE 13. LOCAL COMERCIAL 14. BUGADERIA HOTEL118.90 M² 15. RAMPA CLIENTS HOTEL 16. INSAL·LACIONS 105.80M² 17. MAGATZEM MERCADERIES PENTHOUSE 42.20 18. CARGA/DESCARGA COMERCIAL 251.60 M² 19. RAMPA PÀRQUING RESIDENCIES/PENTHOUSE 70.40M² 20. MAGATZEM COMERCIALS 24M² 21. INSTAL·LACIONS COMERCIAL 69.90 M²

10 12

11

11 10

13

1. LOBBY HOTEL 100.30 M² 2. RECEPCIÓ.CAIXES SEGURETAT.MALETES. ADMINISTRACIÓ 43.8 M² 3. LOBBY LOUNGE 265.04 M² 4. PATI 5. SERVEIS CLIENTS 6. CUINA DE PLANTA 7. RESTAURANT PRINCIPAL 352 M² 8. GIMNÀS 585 M² 9. RAMPA CLIENTS HOTEL 10. DOBLE ESPAI LOCALS 11. ISNTAL·LACIONS SPA-INSTAL·LACIONS PISCINA170 M² 12. MAGATZEMS GIMNÀS 68.30 M² 13. INSTAL·LACIONS RESIDÈNCIES 68.30 M² 14. BUGADERIA RESIDÈNCIES 215.40 M² 15. NETEJA RESIDÈNCIES 147.10 M² 16. DESPATX DIRECTOR 17. NUCLIS APART/PERNTHOUSE

14

1. DOBLE ESPAI A LOBBY HOTEL 96.10M² 2. DOBLE ESPAI A PATI 3. SALA DE SUPORT 25.60 M² 4. SALA REUNIONS 1 60.68 M² 5. SALA DE REUNIONS 2 101.2 M² 6. SALA DE REUNIONS 3 70.80 M² 7. DOBLE ESPAI A LOUNGE A SEGONA PLANTA 8. SALA DE EVENTS 101.50M² 9. CUINA DE PLANTA/CATERING 76.15 M² 10. BAR DE PLANTA 39.60 M² 11. TERRASSA 38.30 M²² 12. ACCÉS RESIDENCIES A HOTEL 13. APARTAMENTS DE 80 M² 14. NUCLIS DE COMUNICACIÓ APARTAMENTS/ PENTHOUSES 15. SPA TOTAL 749 M² 16. PISCINA SPA 100.70 M² 17. TERRASSA EXTERIOR SPA 212.83 M² 18. ZONA SAUNES SPA 103.3 M²

16

17 13

10

17 17

12

18 15

18

14

13

19

Hotel

MEP

SPA/Gimnàs

Comercial

Apartament 1 dormitori

CONCURS D’IDEES

COMPLEX MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA

NOVEMBRE 2016 | 4

A DE NOVA CENTRALITAT UN MON A L’INTERIOR

El tret principal del solar es caracteritza per la seva forma allargada alternant les calització de la zona del concurs, pel que fa la sortides orientació cap al carrer amb el retrocés a la muntanya, provocant un diàleg amb orn natural on s’ubica i les possibles visuals cap al la paisatge muntanya de forma intermitent. Així es generen dos grans espais oberts de llum an d’aquest projecte una oportunitat única per generar un fins als dos patis on s’ubica el gimnàs i l’spa. Proposem instal·lar un que arriben pament urbà d’alta qualitat urbanística, arquitectònica, gran mur vegetal de gran bellesa que arribaria a les cotes més baixes del edifici. ca i mediambiental. El programa del projecte respon a la tipologia d’hotel de 5 estrelles Gran Luxe. trets generals, les plantes a nivell es destinen als usos més públics de recepció, manera es té en consideració la totalitat delAFalgueró,

restaurant, locals comercials, etc; els soterranis a usos propis del servei de l’hotel; les plantes pis ubiquen les habitacions i l’última planta molt més lúdica s’hi situa el skybar. L’hotel està connectat verticalment principalment per dos nuclis d’escales i ascensors seguint les normatives d’incendis més exigents diferenciant els nuclis

connector entre les dues funcions ben diferenciades, l’hotelera i la residencial. En planta tercera hi trobem l’accés al SPA, les sales de reunions i esdeveniments i les residències que contenen una superfície inferior. La circulacions, ben estudiades,

dels clients i els nuclis de serveis.

per evitar el creuament entre clients de l’Hotel i els residents dels apartaments. En aquesta planta elevada hi trobem el bar i la seva terrassa que actua com a

L’Hotel comparteix amb els Apartaments un dels espais que requereix una superfície més elevada, el gimnàs/spa. Aquest actua com a ròtula i element

mirador a la plaça pública del ROC.

espais de continuïtat entre l’àrea del concurs i les unitats ó contigües.

ntervenció esdevindria llavors en forma de ferradura on el a de ser un tall artificial per convertir-se en un espai obert. ona interior podria esdevenir un espai lúdic de trobada diferents usuaris del projecte i un espai que articuli els accessos i possibles connexions transversals. La formació omenada ”el Roc” es conservaria com a un dels elements s mes rellevants dotant de major identitat al conjunt.

ria de les edificacions quedarà definida gràcies a un estudi

t de les visuals, les vistes i el assolellament.

lloc s’estudia com s’integra la volumetria edificatòria a oposant geometries que es percebin de maneres diferents punt de vista.

ó geomètrica dels volums

es proposaria també seguint

ransversals cap als punts de més interès paisatgístic de la es trenquen els volums i s’orienten les façanes per buscar les s cap al Pic Carroi, la vall del Mandriu o cap a Sant Miquel s, per exemple.

CI COM A REFERENT: cal aconseguir una solució clara i nt, justificable d’una manera rotunda intentant relacionar arcel·les existents.

AT: imatge potent, emfatitzin el seu caràcter unitari i racional alhora que cadascun tingui la seva identitat pròpia.

AR AMB EL CONTEXT: La proposta ha de respectar l’edifici de ncrementar el valor del Roc, potenciant-ne els valors i fent edin anul·lats per la nova construcció.

CESSIBILITAT i CIRCULACIONS: Considerem que una dels esoldre la dualitat i diversitat d’accessos entre els diferents difici.

NCIONALITAT: En les parcel·les 4,5,6 és indispensable per al uncionament de l’edifici i la seva adaptació a necessitats que sigui flexible, amb pocs elements fixes.

NTENIMENT i DURABILITAT: provada durabilitat, ent, sostenibilitat i bon balanç mediambiental.

fàcil

IMATGE CANTONADA HOTEL I OFICINES

2 1 4 3

uts de vianants

d’influència de vianants

DEES

PLANTA EMPLAÇAMENT E1:1000 IMATGE SPA

FOTOMONTATGE GENERAL IMATGE PENTHOUSE

PLEX MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA COMPLEX MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA CONCURS D’IDEES

12

NOVEMBRE 2016 NOVEMBRE |1 2016 | 7


Espais semiexteriors i confort exterior adaptatiu Aquesta proposta dóna un valor especial als espais exteriors i als espais semiexteriors de transició. Es proposa

Tots dos espais, pati i plaça, estan dissenyats a partir

un disseny basat en estratègies de confort exterior

d’aquestes premisses, de manera que es condicionin de

adaptatiu. Aquestes estratègies permeten aprofitar les

manera passiva aprofitant les condicions exteriors en cada

condicions climàtiques per maximitzar el confort i generar

època de l'any.

espais de qualitat per als usuaris, que puguin ser utilitzats

En els següents esquemes es pot apreciar el funcionament

durant pràcticament tot l'any, i assegurar la millora de

estacional dels patis en les diverses èpoques de l'any i es

l'experiència de l'usuari amb un baix cost econòmic i un

mostra el paper que juga el disseny de la pèrgola en funció

baix impacte mediambiental.

de les condicions climàtiques externes.

Amb aquest objectiu es proposa el disseny d'espais

.

semiexteriors basats en les següents estratègies: * Hivern: - Protecció en cas de pluja i neu - Potenciació dels guanys solars i l’ “efecte hivernacle” - Disminució de la velocitat del vent *Estiu: - Ombreig - Ventilació natural Els espais exteriors i semiexteriors de la proposta inclouen els espais amb tractament de pati que es creen entre l'edifici principal i el talús de la muntanya, així com

la plaça creada al voltant del Roc.

1

Hivern

Estiu

El pati es cobreix com a protecció en cas de pluja

El pati s’obre i s’afavoreix la ventilació creuada

o neu i per retenir l’escalfor. Possibilitat de terra

aprofitant l’aire fresc de la muntanya.

radiant.

Sun access in January 80 % of the façade has less than 2 sun hours 92% of the façade has less than 4 sun hours

Sun access in July

56 % of the façade has less than 2 sun hours 79% of the façade has less than 4 sun hours 16 | Arup | Títol de l’oferta 1

PLANTA TERCERA

PLANTA QUARTA/CINQUENA

PLANTA SIZENA/SETENA

IMATGE DE L’ENTORN DEL ROC I OFICINES

CONCURS D’IDEES

COMPLEX MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA

NOVEMBRE 2016 | 9

13


Type: Commercial Client: Adunia, Restaurant Location: Madrid, Spain Date: 2016

Restaurante Adunia Extudio Two-story restaurant in the center of Madrid, with two opposing atmospheres. One of them, the entrance, with daylighting on its two facades, and below, a lower level with no lighting except for narrow windows at the top. The restaurant achieves, by differentiating two environments, the element of surprise to the client, adding more variety and richness to space, and providing an environment more related to the day (light in the upper space), and night (darkness in the lower level). In the lower level, the separating cabinet, camouflaged as an upholstered wall, and the flexibility of the lamps allow an adaptation to as many configurations as needed depending on the number of guests.

14


15


16


17


Type: Exhibition Client: Gallery MA Location: Tokyo, Japan Date: 2015

Bamboo Forest Gallery MA Concept design, phisical and 3d modeling and

Throughout

construction planning for a 97 sqm pavilion

Vietnamese staff collaborated with volunteer

for the 30th-anniversary exhibition “The Asian

students in Tokyo, demonstrating how to create

Everyday. Possibilities in the shifting world� at

bamboo structure without any metal joints. The

TOTO GALLERY MA, one of the Japanese most

pavilion is a pure bamboo structure composed

influential galleries for architecture and design,

of a grid, archs and boxes. It embraces greenery

located in Tokyo.

with living bamboo planted into the boxes,

the

construction

period,

expressing the pursuit of bringing greenery

18


19


2 0


2 1


Type: Residential Client: Private Location: Ho Chi Minh City, Vietnam Date: 2016

Bamboo house Private Residence Due to Vietnam's narrow streets, this house

The semi-open staircase is enveloped by creepers,

was designed to create a comfortable living

allowing the branches and leaves to function

space in spite of the limited available space.

as a buffer layer that cuts out direct sunlight.

The site’s density only allows two sides

Moreover, the front façade is inundated with

to create natural ventilation and light into

protruding planter boxes forming deep eaves that

the building. Both the front and back of

permit the clients to keep the windows open during

the house are open and wrapped with

the rainy seasons.

greenery, allowing cool wind to pass through.

2 2


2 3


2 4


2 5


Type: Educational Client: Private, FPT University Location: Ho Chi Minh City, Vietnam Date: 2016

FPT University 3d modeling for a 29,000 sqm University, that

Awards:

appears as an undulating forested mountain

-Vietnam Green Architecture Award of Vietnam

growing out of the city of concrete and brick.

Association of Architects, Gold/ FPT University

This form creates more greenery than is destroyed and provides the city with a new icon for sustainability.

26

-World Architecture Festival (WAF) / Winner for “Future Projects Education� category / FPT Technology Building


2 7


Type: Exhibition Client: Sherman Contemporary Art Foundation (SCAF) Location: Sydney, Australia Date: 2016

Green Ladder SCAF, Fugitive Structures The Sherman Contemporary Art Foundation

The pavilion features a grid-like construction

(SCAF) announced the fourth iteration of its

with a clear ceiling that creates shelter from the

annual pavilion series Fugitive Structures.

elements while allowing visitors to view the sky.

Our design consisted of a pavilion that centers

Overall the structure is highly porous, which

around the innovative use of bamboo, and

allows various entry points for adults and

office passion and self-imposed duty to green

children to walk or crawl through.

the world’s urban landscapes with plants and vegetation.

2 8


2 9


3 0


3 1


3 2


3 3


Type: Exhibition Client: Private Location: Ho Chi Minh City, Vietnam Date: 2016

Diamond Island Community Hall 3d modeling and construction planning for a

Awards:

project located on Diamond Island, an artificial

-IAA (International Architecture Awards) 2015/

islet in District 2, Ho Chi Minh City.

Diamond Island Community Hall

Surrounded by high-rise condominiums, 8 bamboo domes are scattered on the plot, offering places for local community. Its program includes conference, meeting, children activities, banquets and parties. Bamboo stalks are woven into 24m-diameterdome like traditional baskets to enclose fowls, showing a fusion of traditional folk art and contemporary architecture.

3 4

-Green Good Design, USA / Diamond Island Community Hall


3 5


3 6


3 7


3 8


3 9


Type: Bran Client: Studere Location: Porto, Portugal Date: 12.02.18

From the house to the city Final thesis (9/10) Under the tutelage of Maria Jose Aranguren, my final thesis is located in Paris. Specifically, in the water reservoir of the 16th arrondissement,

to the wall, the building grows and decreases according to the needs of the designer and the future of the company.

a giant walled enclosure that served to supply water by gravity to the whole neighborhood.

By

using

support

boyd

the

beams,

highest

load

calculated with

to

100%

In this large space, a residence plus workshop

occupancy, and taking the circulation to the

center for a fashion designer is proposed.

outside, the system is easy to assemble. I was proposed to Mention of Honor and

My idea was clear from the very beginning: this place is more than a work center. It can become a great social park, putting in value its location. Furthermore, it was a personal must that these magnificent walls should never be destroyed. Through a prefabricated system, anchored

4 0

highlighted by its sensitivity to the environment, constructive system and improvement of the social space for this Parisian neighborhood where it was located.


FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM MARZO 2017

AULA PFC ARANGUREN

TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN

GUILLERMO GARCÍA ARROYO 08168

4 1


FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM MARZO 2017

AULA PFC ARANGUREN

TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN

PA AC UL CE VA SO LÉ RY

GUILLERMO GARCÍA ARROYO 08168

Situación E_1:400

BARRIO DE PASSY

Haussmann le confía al ingeniero Belgrand la realización de un nuevo sistema de abastecimiento de agua de la capital, que acabará en la construcción de 600 kilómetros de acueducto entre 1865 y 1900. El primero, el de Dhuis, devuelve una agua captada cerca de Château-Thierry. Estos acueductos vierten su agua en depósitos situados dentro de la capital. Dentro de la capital y al lado del parque Montsouris, Belgrand erige el depósito de agua más grande. Una segunda red, consagrada al agua no potable, también saca el agua del Ourcq y del Sena para la limpieza de las calles y el riego de los espacios verdes. Reservoir de Passy es uno de estos depósitos y vertebrador del sistema de aguas del Distrito XVI (barrio de Passy).

RU ACCE E LAU SO RIS

TO

N

Las renovaciones de Haussman del centro de la ciudad arrastraron una subida de los alquileres que forzó a las familias pobres a trasladarse hacia los distritos periféricos. Algunas decisiones de ésta política urbanística contribuyeron a desequilibrar le composición de París entre el oeste, rico (Barrio de Passy), y el este de la ciudad, desfavorecido. Así ningún barrio del este parisino fue beneficiado con obras comparables a las largas avenidas en torno a la plaza de la Estrella en los distritos XVI (Passy) y XVII.

HAUSSMANN & PASSY

Haussmann fue más alla de crear equipamientos adecuados o disponer un trazado e calles adecuado. También interviene en el aspecto estético de los edificios de nueva planta.

Se sigue un diseño arquitecto homogéneo, unificando el edificio con su contexto. El reglamento de urbanismo de París favorece una tipología que acabará definiéndose como estilo haussmaniano, caractéristico de Paris: -Piso bajo y entresuelo con pared a profundos redans. -Segundo piso noble con uno o dos balcones. -Tercer y cuarto piso en el mismo estilo pero con marcos de ventana menos elaborados. -Quinto piso con balcón sin decoraciones. -Cubiertas a 45 grados.

ACCESO RUE COPERNIC

Las fachadas se organizas disponiendo una horizontalidad que se continúa entre fachadas de diferentes parcelas. Los balcones y cornisas no deben tener salientes muy marcados. Sobre estas fachadas, los progresos de las técnicas de aserradura y de transporte permiten utilizar la piedra de sillería en forma de bloques de gran tamaño. Haussmann buscaba que las calles producieran un efecto monumental sin recurrir a una sobrecarga de ornamentación, más de final de siglo.

FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM MARZO 2017

AULA PFC ARANGUREN

TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN

GUILLERMO GARCÍA ARROYO 08168

CATÁLOGO SECCIONES TRANSVERSALES_E1:175

7.20 2.70 7.20 2.70

1.80

1.80

7.20 2.70

2.70

1.80

7.20 2.70

2.70

1.80

2.70

7.20 2.70

2.70

1.80

7.20 2.70

2.70

1.80

2.70

2.51 7.20 5.45 3.60

0.90

5.45

2.70 2.95

2.95

7.20 11.26 2.70

1.80

11.26 5.88

11.26

5.88

2.70 8.75

2.93

8.75

2.93

2.93

2.93

2.93

2.88

2.88

2.88

8.75

5.80 2.88

2.88

2.88

I+I+I Reuniones Marketing Administración

I+I Exposición Showroom + Administración

I Talleres Privados Hedi Slimane + Galería Superior

I+I+I Marketing Campañas Retail

7.20 2.70

1.80

2.70

1.80

7.20 2.70

2.70

1.80

2.88

I + III + I Administación Showroom Galería

II + I + I Galería Exposición Exposición

II + I +I Espectáculos Almacén Galería

7.20 2.70

2.88

7.20 2.70

2.70

1.80

II + I Exposición Galería

7.20 2.70

2.70

1.80

7.20 2.70

2.70

1.80

7.20 2.70

1.80

2.70 2.51

2.51

2.51

2.51

2.51

2.51

7.20 2.70

1.80

2.70

2.95

2.95

2.95

11.26 8.75 5.80

5.80

4 2

2.95

2.95

11.26

11.26

2.95

11.26

11.26

2.93

2.93

2.93

2.93

2.93

2.88

2.88

2.88

2.88

2.88

5.80 2.88

I + II Galería Showroom

2.95

11.26

2.93

II Showroom

I + I + II Galería Restauración Talleres

I+I+I+I Galería Salas de reuniones Galería

I+I+I+I Galería Oficina Retail

I+I+I+I Oficinas Showroom Taller Galería

I+I+I+I Oficinas Retail

I+I+I+I Promenade | Talleres Privados Hedi Slimane

2.70


FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM MARZO 2017

AULA PFC ARANGUREN

TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN

GUILLERMO GARCÍA ARROYO 08168

NSOR ASCE

C7´ C7

55 C7

50

C7´

C7

45 40

C7 C7 C7

30

C7

C7´

C7

C7´

CASA

C7´

C7´

C7 C7

C7´

C7´

C7´

C7´

C7´

C7

C7´

C7´

C7

C7

C7´

20

15

C7´

C7

E IA RUIC ER GAL PERN CO

15

C7

20

C7´

C7

C7

C7´

Almacén Talleres

Sala de reuniones I

25

C7

C7

C7´

C7´

C7´

Sala de reuniones II

C7´

C7

10

CASA

C7´

C7´

C7´

DE HE

DI

C7

C7

C7´

5

Espacios de taller École de la chambre syndicale de la couture parisienne para estudiantes de moda

DE HE

C7

DI

C7´

C7´

C7

C7´

C7

0

C7´

C7

35

C7

C7´

C7´

C7

C7´

C7´

C7´

C7

C7´

C7´

C7

C7´

C7

C7´

C7

C7´

C7´

ATEL IER CREA CIÓN

C7

C7´

C7

C7´

C7

C7

Admin istr Marke ación ting

C7´

Sala

C7´

de reu

C7

niones

C7´

C7

C7´

C7

Nueva Saint s campañ Lauren as t Paris

C7´

C7

C7´

C7

C7´

C7

60

C7´

C7

C7´

C7

C7´

65

C7´

C7

C7´

C7

ASCE

C7´

NSOR

C7´

C7

ASCE

C7´

NSOR

PLANTAS 1,2,3_E1:175

C7

C7

C7´

C7´

C7

C7

C7´

C7´

C7

C7

C7´

C7´

C7

C7´

C7

C7

C7´

10

C7

25

C7´

C7´

C7´

C7

C7

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´ C7

5

C7

C7´

C7´

C7´

C7

C7´

Administración Talleres

Taller I

´

Taller II

C7

30

Taller III

0

35 C7

Conexión Nuevos espacios Passy Galería superior - Promenade 40

C7

C7

C7

C7

C7

C7

C7

C7

C7

C7

GALERÍA RUE LARISTON

25

C7

C7

20

C7

15

C7

C7

10

C7

C7

5

C7

0

TALLERES ESTUDIANTES

30

35

40

50

45

60

55

65

70

80

75

FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM MARZO 2017

AULA PFC ARANGUREN

TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN

GUILLERMO GARCÍA ARROYO 08168

IÓN SIC PO EX RNIC SO PE CE AC RUE CO

65

C7´

C7

40

C7´

BOU

C7

TIQU

E

C7´

45

MÓD ULO ASE OS

C7´

C7

50

MÓD ULO ASE OS

C7´

C7

55

+0.0

0

+11.

C7´

20

C7

60

C7´

C7

ASC

ENS

OR

C7

C7´

C7´

ACC ESO OFIC RUE INAS PAU L VALÉ RY

PLANTA BAJA_E1:175

+11 0

35

0.0

.20

25

C7

PRIV ADO

20

20

C7´

C7

15

IÓN

SIC

C7´

PO

EX

C7

+0.0

0

+11.

ESO ACC

WOR

C7´

10

KSH OP

C7´

5

C7

30

C7´

C7

0 C7

MÓD ULO ASE OS

C7´

20

15

+11.05

+11.20

C7´

C7

10

25 C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

C7´

35

0

5

C7

30 TALLERES HEDI SLIMANE

ACCESO TALLERES ESTUDIANTES

+11.20

+0.00

40

ACCESO TALLERES RUE LAURISTON C7

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

4 3


FROM TO

Casa-Talle

AR RESERV ETS

AULA P

TUTOR: DAVID C ENRIQUE AZPIL

GUILLER

SECCIONE

2.32

4.00

0

Acceso Rue Copernic

4.00

5

4.00

4.00

4.00

15

10

4.00

20

4.00

25

4.00

4.00

35

4.00

40

4.00

4.00

4.00

50

45

4.00

4.00

Taller III

Taller II

4.00

4.00

70

4.00

75

4.00

85

80

Conexión Calle-Nuevo parque de Passy

Administración Talleres

Taller I

4.00

65

60

55

Espacios de taller École de la chambre syndicale de la couture parisienne para estudiantes de moda

Conexión Showroom Talleres

Exposiciones Showroom

4.00

30

Conexión Nuevos espacios Passy Galería superior - Promenade

Sala de reuniones II Sala de reuniones I

Taller p Hedi S

Instalaciones

ACCESO RUE LAURISTON 0

4 4

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100


THE HOUSE THE CITY

er para Hedi Slimane

RCH-COUTURE VOIR DE PASSY, PARIS SAM MARZO 2017

PFC ARANGUREN

D CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: LICUETA & ALBERTO BALLARÍN

RMO GARCÍA ARROYO 08168

ES DESPLEGADAS E_1:300

4.00

4.00

4.00

90

4.00

95

4.00

4.00

105

100

4.00

4.00

110

4.00

4.00

120

115

4.00

125

4.00

4.00

130

4.00

135

4.00

140

4.00

4.00

145

4.00

150

4.00

155

4.00

160

165

170

Oficina Saint Laurent Paris

Conexión Oficinas -Taller Hedi Slimane

Conexión y galería Oficina Residencia

Residencia Hedi Slimane

Sala de reuniones

Administración Marketing

Nuevas campañas Saint Laurent Paris

Acceso Paul Valéry

Retail

privados Slimane

105

Instalaciones

110

115

120

125

130

135

140

145

Instalaciones

150

155

160

165

170

175

180

185

190

4 5


FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM FEBRERO 2017

AULA PFC ARANGUREN

TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN

GUILLERMO GARCÍA ARROYO 08168

CONFIGURACIÓN - E.1:200 RESPETO + RECONVERSIÓN Los depósitos de Passy no son solo un lugar al que ir, sino que son un servicio a la ciudad de Paris que hay que maximizar. Pero no sólo a nivel de barrio, sino entendiendo el proyecto como un ente capaz de realizar un impacto en toda la ciudad. Para ello se concibe el Atelier Hedi Slimane como un ejemplo de reconversión, sostenibilidad y respetuosidad con el entorno. Análisis del ciclo de vida del proyecto: 0.0.0. Estado de Arranque: Llegada a Passy: Infinidad de posibilidades. La primera decisión es cerrar la manzana y no romper el muro: Principios innegociables del proyecto. 1.1.1. Primer contacto. Contacto con Passy: Construcciones a Nivel 1. Se disponen los espacios a nivel de Planta Baja y si el crecimiento de la empresa es mayor, se procedería a ampliar. 4.1.0. Primer Gran Crecimiento. Llegada a Passy: Infinidad de posibilidades. La primera decisión es cerrar la manzana y no romper el muro: Principios innegociables del proyecto. 4.4.1. Gran desarrollo semiprivado. Oficinas y Taller desarrollados: La empresa amplia su plantilla y los frentes a calles Paul Valéry y Lariston se encuentran ampliamente desarrollados. Se dejan las cubiertas de planta 1 como galerías accesibles para el público. 4.4.4. Passy Conquistado. Los tres frentes han crecido en altura. Los espacios de charnela entre calles se encuentran abiertos, diferenciando cada lateral como sus usos interiores. El frente de Paul Valéry es privado (oficinas), el de Rue Lariston semiprivado (Talleres para Hedi Slimane y talleres de estudiantes), y el de Copernic es público (Exposiciones). 1.1.4. Predominancia Espacios Públicos. Si Hedi Slimane pusiera fin a su estancia en Passy, el nuevo status de espacio público adquirido no se vería influido. El sistema independiente en estructura y programa permite que los accesos estén diferenciados y una parte no afecte a otra si alguna no funcionara. 1.1.1. Vuelta a Primer contacto. Contacto con Passy: Construcciones a Nivel 1. Se disponen los espacios a nivel de Planta Baja si el crecimiento de la empresa es menor, se puede adoptar un estado inicial de nuevo. 0.0.0. Vuelta a Estado de Arranque. Desintegración de Proyecto Passy. De manera respetuosa con Reservoir de Passy no se deja huella. El principio de no romper el muro se mantiene: Principio innegociable del proyecto.

ACCESO GALERÍA DE EXPOSICIONES

1.1.4.

GALERÍA EXPOSICIÓN

ACCESO GALERÍA SUPERIOR

4.4.4.

TALLERES RUE LAURISTON

4.4.1.

ACCESO TALLERES ESTUDIANTES RUE LARISTON

ACCESO TALLERES ESTUDIANTES

4.1.1.

1.1.1.

0.0.0.

4 6

ACCESO GALERÍA SUPERIOR


OFICINAS - BOUTIQUE HEDI SLIMANE

NUEVO PARQUE PÚBLICO YVES SAINT LAURENT

ACCESO OFICINAS PAUL VALÉRY

RESIDENCIA HEDI SLIMANE

TALLERES HEDI SLIMANE

Visitez le nouveau Passy

4 7


FROM TH TO TH

Casa-Taller pa

ARCHRESERVOIR ETSAM FE

AULA PFC

TUTOR: DAVID CAS CONST ENRIQUE AZPILICUE

GUILLERMO 0

VISTA DESD PAUL

CONTROL ACCESOS

CONTROL ENVÍOS / LLEGADAS MATERIAL

DIRECCIÓN

PASARELAS ACCESO A OFICINAS

ACCESO PAUL VALÉRY

4 8

RETAIL HEDI SLIMANE YVES SAINT LAURENT

NUEVAS CAMPAÑAS YVES SAINT LAURENT

ADMINISTRACIÓN MARKETING

GALERIA PRIVADA DE OFICINAS

CASA HEDI SLIMANE


HE HOUSE HE CITY

ara Hedi Slimane

-COUTURE DE PASSY, PARIS EBRERO 2017

C ARANGUREN

SINO & MARÍA GONZÁLEZ TRUCCIÓN: ETA & ALBERTO BALLARÍN

GARCÍA ARROYO 08168

DE ESTANQUE VALÉRY

TALLERES ESTUDIANTES

DESPACHOS / SALAS REUNIÓN

SALA REUNIONES 2

ADMINISTRACIÓN TALLERES ESCUELA

TALLER OFICINAS YVES SLIMANE

ACCESO RUE COPERNIC

EXPOSICIONES SHOWROOM

4 9


Part

Software licensed to Arup Job Title

Ref

Client

File

By

Date21-Oc

Structure1 Guillermo PFC

FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM FEBRERO 2017

AULA PFC ARANGUREN

TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN

GUILLERMO GARCÍA ARROYO 08168

7.031 kN-m

ESTRUCTURA II

Caso de carga crítico (16)

4.620 kN-m

Perfiles Cálculos Caso de carga representado

19.261 kN-m -0.148 kN-m

7.031 kN-m

17.831 kN-m

5.169 kN-m -0.147 kN-m

4.636 kN-m

27.990 kN-m

19.245 kN-m

-6.322 kN-m

-0.121 kN-m

7.031 kN-m

27.990 kN-m

19.252 kN-m

27.990 kN-m

19.252 kN-m

27.990 kN-m

19.252 kN-m

4.636 kN-m

17.831 kN-m

27.990 kN-m

19.245 kN-m

-0.299 kN-m -0.122 kN-m

51.606 kN-m

-0.297 kN-m -0.139 kN-m

51.604 kN-m

-0.998 kN-m

27.990 kN-m

51.576 kN-m

-1.002 kN-m

27.990 kN-m

-0.998 kN-m

27.990 kN-m

27.990 kN-m

38.790 kN-m -0.097 kN-m

231.681 kN-m 161.925 kN-m

27.990 kN-m 38.790 kN-m

-0.212 kN-m -27.809 kN-m 38.790 kN-m

147.020 kN-m

52.912 kN-m

10.227 kN-m 0.162 kN-m

-0.348 kN-m

52.354 kN-m

27.990 kN-m

-0.109 kN-m -11.233 kN-m 107.293 kN-m 129.088 kN-m 58.084 kN-m

38.790 kN-m 10.105 kN-m

38.790 kN-m

94.404 kN-m

27.990 kN-m

-0.126 kN-m

-0.113 kN-m -27.991 kN-m

147.880 kN-m

52.572 kN-m

25.783 kN-m -0.212 kN-m

52.486 kN-m

X

52.512 kN-m

38.790 kN-m

233.065 kN-m 162.486 kN-m

27.990 kN-m

-0.020 kN-m

37.346 kN-m

38.790 kN-m -0.126 kN-m

-0.125 kN-m -27.974 kN-m

147.890 kN-m

25.899 kN-m -0.311 kN-m 36.725 kN-m

-0.164 kN-m

36.956 kN-m

27.990 kN-m

-0.125 kN-m -27.975 kN-m

147.900 kN-m

52.505 kN-m

232.992 kN-m 162.367 kN-m

27.990 kN-m

38.790 kN-m

Y

38.790 kN-m

233.007 kN-m 162.367 kN-m

27.990 kN-m 38.790 kN-m 25.886 kN-m -0.109 kN-m

-0.198 kN-m 3.530 kN-m

-0.726 kN-m

-0.113 kN-m -27.974 kN-m

147.890 kN-m -0.097 kN-m

36.827 kN-m

-0.117 kN-m 3.512 kN-m

36.790 kN-m

38.790 kN-m

27.990 kN-m

-0.348 kN-m

52.512 kN-m

25.887 kN-m -0.124 kN-m

38.790 kN-m

-0.979 kN-m

-0.098 kN-m

38.790 kN-m

232.992 kN-m 162.367 kN-m

27.990 kN-m 38.790 kN-m

51.615 kN-m

52.912 kN-m

-0.212 kN-m -27.991 kN-m

147.880 kN-m

52.572 kN-m

25.886 kN-m -0.124 kN-m 36.829 kN-m

-0.123 kN-m 3.511 kN-m

38.790 kN-m

-3.976 kN-m

0.050 kN-m

38.790 kN-m

233.065 kN-m 162.486 kN-m

27.990 kN-m 38.790 kN-m

-4.033 kN-m -0.129 kN-m

22.262 kN-m

-4.036 kN-m -0.099 kN-m

38.790 kN-m

94.404 kN-m

-0.109 kN-m -27.809 kN-m

147.020 kN-m

25.899 kN-m -0.109 kN-m 36.827 kN-m

-0.123 kN-m 3.512 kN-m

38.790 kN-m

-0.120 kN-m -0.561 kN-m

22.197 kN-m

-0.074 kN-m -11.233 kN-m 107.293 kN-m 129.088 kN-m 58.084 kN-m

231.681 kN-m 161.925 kN-m

27.990 kN-m 38.790 kN-m

-4.033 kN-m -0.121 kN-m

22.231 kN-m

-0.123 kN-m -0.563 kN-m

-0.301 kN-m

36.790 kN-m

-0.117 kN-m 3.511 kN-m

38.790 kN-m

38.790 kN-m

27.990 kN-m

-0.979 kN-m

27.990 kN-m

93.357 kN-m

27.990 kN-m 38.790 kN-m 25.783 kN-m -0.311 kN-m

-4.033 kN-m -0.121 kN-m

22.229 kN-m

-0.121 kN-m -0.564 kN-m

46.976 kN-m

10.227 kN-m -0.212 kN-m 36.725 kN-m

-0.198 kN-m 3.512 kN-m

38.790 kN-m

-0.299 kN-m -0.122 kN-m

27.990 kN-m

27.990 kN-m

-0.726 kN-m

27.990 kN-m

-11.049 kN-m 106.905 kN-m 127.585 kN-m 58.613 kN-m

38.790 kN-m

51.604 kN-m

38.790 kN-m

27.990 kN-m

-0.164 kN-m 3.530 kN-m

-4.036 kN-m -0.129 kN-m

22.231 kN-m

-0.121 kN-m -0.564 kN-m

46.933 kN-m

-0.135 kN-m -6.322 kN-m

25.525 kN-m

27.990 kN-m 38.790 kN-m

46.951 kN-m

27.990 kN-m

10.105 kN-m 0.162 kN-m

52.486 kN-m

-0.123 kN-m -0.564 kN-m

38.790 kN-m

25.565 kN-m

17.831 kN-m

5.169 kN-m

27.990 kN-m

51.576 kN-m

27.990 kN-m

-0.122 kN-m -6.317 kN-m

38.790 kN-m 36.956 kN-m

-3.976 kN-m -0.099 kN-m

22.262 kN-m

38.790 kN-m

25.548 kN-m

17.831 kN-m

5.174 kN-m

-0.020 kN-m

38.790 kN-m

46.952 kN-m

-0.122 kN-m

-0.147 kN-m 27.990 kN-m

19.261 kN-m

52.354 kN-m

27.990 kN-m

-0.120 kN-m -0.563 kN-m

38.790 kN-m -0.299 kN-m -0.122 kN-m

-6.319 kN-m

-0.148 kN-m

4.620 kN-m

27.990 kN-m

-0.122 kN-m

25.546 kN-m

-0.123 kN-m

37.346 kN-m

22.197 kN-m 51.615 kN-m

-6.319 kN-m

-0.121 kN-m

5.172 kN-m

7.031 kN-m

-0.297 kN-m -0.122 kN-m

46.951 kN-m

-0.123 kN-m

27.990 kN-m

-0.561 kN-m

38.790 kN-m

25.548 kN-m

17.831 kN-m

5.171 kN-m

7.031 kN-m

27.990 kN-m

-6.319 kN-m

4.630 kN-m

38.790 kN-m -0.301 kN-m -0.139 kN-m

46.933 kN-m

-0.122 kN-m

-0.123 kN-m

7.031 kN-m

-0.135 kN-m -6.317 kN-m

25.565 kN-m

17.831 kN-m

5.172 kN-m -0.123 kN-m

4.629 kN-m

46.976 kN-m

-0.123 kN-m

4.630 kN-m

-0.123 kN-m

7.031 kN-m

25.525 kN-m

17.831 kN-m

5.174 kN-m

-0.098 kN-m

-0.074 kN-m -11.049 kN-m 106.905 kN-m 127.585 kN-m 58.613 kN-m

38.790 kN-m

93.357 kN-m

0.050 kN-m

38.790 kN-m

Load 16 : Bending Z Moment - kN-m

FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane

Job No

Software licensed to Arup

Software licensed to Arup

Job Title

Job Title

Rev

1

Job No

Part

Software licensed to Arup

Ref

Job Title

By Client

Sheet No

Client

File

Date21-Oct-16

Structure1 Guillermo PFC

Date/Time

Rev

1

Job No

Part

Software licensed to Arup

Ref

Chd

Job Title

By Client

05-Jan-2017 10:21

Sheet No

File

Date21-Oct-16

Structure1 Guillermo PFC

Date/Time

ARCH-COUTURE Job No Sheet No RESERVOIR DE PASSY, PARIS 1 ETSAM FEBRERO 2017

Rev

1

Part Job Title

By Client

File

Date21-Oct-16

Structure1 Guillermo PFC

Date/Time

Rev

Job No

Software licensed to Arup

TUTOR: DAVID CASINO & MARÍA GONZÁLEZ By Date CONSTRUCCIÓN: 21-Oct-16 File Structure1 Guillermo PFC Date/Time ENRIQUE AZPILICUETA & ALBERTO BALLARÍN

Chd Client

05-Jan-2017 10:21

Part

AULARefPFC ARANGUREN

Software licensed to Arup

Ref

Chd

05-Jan-2017 10:21

Sheet No

Sheet No

Rev

1

Job No

Part

Job Title

Ref

Client

File

Chd

Software licensed to Arup

By

05-Jan-2017 10:21

Date21-Oct-16

Structure1 Guillermo PFC

Date/Time

Sheet No

Rev

1

Job No

Part

Job Title

Ref

Client

File

Chd

Software licensed to Arup

By

05-Jan-2017 10:21

Date21-Oct-16

Structure1 Guillermo PFC

Date/Time

Sheet No

Rev

1

Job No

Part

Job Title

Ref

Client

File

Chd

Sheet No

1

Part Ref

By

05-Jan-2017 10:21

Date21-Oct-16

Structure1 Guillermo PFC

Date/Time

Chd

By File

05-Jan-2017 10:21

Date21-Oct-16

Structure1 Guillermo PFC

Date/Time

Chd

05-Jan-20

GUILLERMO GARCÍA ARROYO 08168

ESTRUCTURA I 16 CASOS DE CARGA

CÁLCULOS

Cargas Situaciones

10.391 kN-m

7.031 kN-m

21.110 kN-m

17.831 kN-m 0 kN-m

0.787 kN-m

-0.788 kN-m

-0.631 kN-m

14.094 kN-m

13.224 kN-m

-3.022 kN-m

4.761 kN-m

24.894 kN-m

23.943 kN-m

-0.252 kN-m

15.218 kN-m

14.094 kN-m

26.000 kN-m

-0.303 kN-m

24.894 kN-m

3.642 kN-m

14.666 kN-m

Y Z X

-16.206 kN-m

8.645 kN-m

Y Z X

5.324 kN-m

0.303 kN-m

0 kN-m

0 kN-m

0 kN-m

-1.945 kN-m

1.945 kN-m

9.603 kN-m

7.031 kN-m

0 kN-m

-0.649 kN-m

-0.649 kN-m

-5.324 kN-m

0.580 kN-m

5.324 kN-m

9.266 kN-m

0 kN-m

-0.580 kN-m

0 kN-m

-9.265 kN-m

0.414 kN-m

13.897 kN-m

Y Z X

-8.645 kN-m

0.275 kN-m

Y Z X

0.276 kN-m

-0.276 kN-m

14.094 kN-m

Y Z X

0.586 kN-m

24.894 kN-m

21.171 kN-m

14.094 kN-m

-0.275 kN-m

23.311 kN-m

Y Z X

41.609 kN-m

0.283 kN-m

38.790 kN-m

38.790 kN-m

0.017 kN-m

31.528 kN-m

27.990 kN-m

3.548 kN-m

42.310 kN-m

-3.621 kN-m

38.790 kN-m

34.306 kN-m 14.094 kN-m -6.903 kN-m

-19.070 kN-m

17.831 kN-m

17.301 kN-m

-5.668 kN-m

30.889 kN-m

0.051 kN-m

-2.432 kN-m

24.894 kN-m 4.806 kN-m

6.581 kN-m

5.823 kN-m

27.990 kN-m

38.790 kN-m

10.388 kN-m

2.737 kN-m

22.597 kN-m

7.031 kN-m

38.790 kN-m

47.139 kN-m

36.357 kN-m

27.990 kN-m

17.831 kN-m

-5.392 kN-m

10.151 kN-m

-0.287 kN-m

-3.242 kN-m

0 kN-m

-13.032 kN-m

20.322 kN-m

1.062 kN-m

44.681 kN-m

0.248 kN-m

-0.414 kN-m

13.028 kN-m

0 kN-m

7.369 kN-m

7.031 kN-m

24.894 kN-m

20.871 kN-m

0 kN-m

-9.265 kN-m

-0.415 kN-m

0 kN-m

-13.032 kN-m

17.831 kN-m

-0.907 kN-m

33.962 kN-m

-0.580 kN-m

9.266 kN-m

0 kN-m

0.415 kN-m

13.028 kN-m

0 kN-m

18.088 kN-m

5.547 kN-m

0 kN-m

27.990 kN-m 13.897 kN-m

-10.544 kN-m

2.864 kN-m

-5.324 kN-m

0.580 kN-m

1.189 kN-m

18.956 kN-m

-2.864 kN-m

0 kN-m

0.649 kN-m

27.990 kN-m

-4.829 kN-m

0 kN-m

-1.945 kN-m

0.649 kN-m

13.897 kN-m 0 kN-m

-0.379 kN-m

0 kN-m

-10.544 kN-m

1.945 kN-m

0 kN-m

-4.761 kN-m

21.139 kN-m 0 kN-m

0.379 kN-m

18.956 kN-m

13.897 kN-m

0 kN-m

-0.788 kN-m

-3.073 kN-m

0.034 kN-m

0 kN-m

-1.189 kN-m

24.894 kN-m

15.350 kN-m

-3.022 kN-m

0.276 kN-m

21.139 kN-m

13.897 kN-m

2.359 kN-m

14.094 kN-m

0 kN-m

-0.034 kN-m

-4.829 kN-m

-2.053 kN-m

Y Z X

0 kN-m

0 kN-m

20.738 kN-m -3.073 kN-m

0.552 kN-m

0 kN-m

-0.276 kN-m

20.738 kN-m

13.897 kN-m

220.337 kN-m

17.530 kN-m

Y Z X

3.927 kN-m

38.790 kN-m

27.990 kN-m 12.053 kN-m

-24.851 kN-m

23.762 kN-m

212.560 kN-m

26.175 kN-m

190.774 kN-m

-27.715 kN-m

182.997 kN-m 160.669 kN-m

127.706 kN-m

121.083 kN-m

98.143 kN-m

84.817 kN-m

75.852 kN-m

36.266 kN-m

Load 1 : Bending Z Moment - kN-m

24.894 kN-m

14.094 kN-m

92.631 kN-m

92.631 kN-m

0 kN-m

Job No

Software licensed to Arup

Software licensed to Arup Job Title

Ref

Client

File

By

Print Time/Date: 05/01/2017 11:16

12.335 kN-m

19.166 kN-m

1.436 kN-m

1.131 kN-m

23.055 kN-m

Sheet No

11.547 kN-m

7.031 kN-m

0.828 kN-m

7.658 kN-m

20.033 kN-m

4.898 kN-m

9.314 kN-m

-2.828 kN-m

24.894 kN-m

Y Z X

3.153 kN-m

35.625 kN-m

27.990 kN-m

27.990 kN-m

24.894 kN-m

11.905 kN-m

1.945 kN-m

28.378 kN-m

-9.391 kN-m

Job No

Software licensed to Arup

Date/Time

7.031 kN-m

1.166 kN-m

0.631 kN-m

8.526 kN-m

27.091 kN-m

30.437 kN-m

-3.657 kN-m

24.894 kN-m -8.227 kN-m

Y Z X

By File

9.565 kN-m

0.007 kN-m

-0.528 kN-m

0.862 kN-m

Y Z X

38.790 kN-m

19.655 kN-m

14.094 kN-m

14.094 kN-m

-2.018 kN-m

24.894 kN-m

17.834 kN-m

3.963 kN-m

6.125 kN-m

Y Z X

19.245 kN-m

7.031 kN-m

-15.931 kN-m

14.390 kN-m

-16.482 kN-m

23.586 kN-m

211.279 kN-m

-18.795 kN-m

23.035 kN-m

-6.317 kN-m

46.933 kN-m

107.195 kN-m

0.596 kN-m

40.794 kN-m

27.990 kN-m

3.134 kN-m

47.334 kN-m

-0.297 kN-m

-0.563 kN-m

51.576 kN-m

38.790 kN-m

33.044 kN-m

-3.207 kN-m

38.790 kN-m

14.094 kN-m -19.935 kN-m

103.710 kN-m

-19.346 kN-m

17.805 kN-m

199.825 kN-m

Y Z X

27.990 kN-m

4.342 kN-m

25.081 kN-m 10.729 kN-m

Y Z X

3.512 kN-m

Load 9 : Bending Z Moment - kN-m

14.094 kN-m

24.894 kN-m 8.402 kN-m

Load 10 : Bending Z Moment - kN-m

27.990 kN-m

24.894 kN-m

Load 11 : Bending Z Moment - kN-m

27.990 kN-m

-24.576 kN-m

17.254 kN-m

38.790 kN-m

36.790 kN-m

27.990 kN-m -0.979 kN-m

233.065 kN-m -25.127 kN-m

26.450 kN-m

203.502 kN-m

188.527 kN-m

-27.439 kN-m

25.899 kN-m

-27.991 kN-m

192.049 kN-m

147.880 kN-m 132.805 kN-m 110.871 kN-m

108.294 kN-m

93.218 kN-m

92.159 kN-m 69.855 kN-m

63.064 kN-m

24.894 kN-m

38.790 kN-m

22.262 kN-m

-4.036 kN-m

38.790 kN-m

27.990 kN-m

162.486 kN-m 140.434 kN-m

99.418 kN-m

77.632 kN-m 47.988 kN-m

38.790 kN-m

25.565 kN-m

170.263 kN-m 148.940 kN-m

148.211 kN-m 118.648 kN-m

64.124 kN-m

17.831 kN-m

4.636 kN-m

5.174 kN-m

27.990 kN-m

240.842 kN-m 14.941 kN-m

14.094 kN-m

52.572 kN-m 24.894 kN-m

7.342 kN-m

Load 12 : Bending Z Moment - kN-m

38.790 kN-m 14.094 kN-m

23.477 kN-m

Load 13 : Bending Z Moment - kN-m

38.790 kN-m 14.094 kN-m

Load 14 : Bending Z Moment - kN-m

27.990 kN-m

38.790 kN-m

Load 15 : Bending Z Moment - kN-m

27.990 kN-m

38.790 kN-m

-32.245 kN-m

Print Time/Date: 05/01/2017 11:17

Print Time/Date: 05/01/2017 11:17 STAAD.Pro V8i (SELECTseries 6) 20.07.11.70

5 0

Print Run 1 of 1 STAAD.Pro

Print Time/Date: 05/01/2017 11:17 V8i (SELECTseries 6) 20.07.11.70

Print Run 1 of 1 V8i (SELECTseries 6) 20.07.11.70 Print Time/Date: 05/01/2017 11:18 STAAD.Pro

Print Run 1 of 1 STAAD.Pro

Date/Time

1.123 kN-m

-2.847 kN-m

38.790 kN-m 21.273 kN-m

14.094 kN-m

1

Date21-Oct-16

Structure1 Guillermo PFC

Print Run 1 of 1 V8i (SELECTseries 6) 20.07.11.70 STAAD.Pro

38.790 kN-m

36.284 kN-m

Sheet No

Ref

-5.018 kN-m

36.213 kN-m

Job No

Chd

05-Jan-2017 10:21

4.827 kN-m

38.790 kN-m

37.874 kN-m

24.894 kN-m

2.323 kN-m

27.990 kN-m

Load 8 : Bending Z Moment - kN-m

Part

Date/Time

17.831 kN-m

15.356 kN-m

6.472 kN-m

27.990 kN-m

Rev

1

Date21-Oct-16

Structure1 Guillermo PFC

Print Time/Date: 05/01/2017 11:17 V8i (SELECTseries 6) 20.07.11.70

7.031 kN-m

38.790 kN-m

Ref

File

By

Print Run 1 of 1 STAAD.Pro

Sheet No

Part

Job Title

Client

Chd

05-Jan-2017 10:21

-6.041 kN-m

50.005 kN-m

Job No

Software licensed to Arup

Date/Time

17.831 kN-m

5.424 kN-m

0.413 kN-m

38.790 kN-m 14.094 kN-m

Rev

1

Date21-Oct-16

Structure1 Guillermo PFC

Print Time/Date: 05/01/2017 11:17 V8i (SELECTseries 6) 20.07.11.70

22.267 kN-m

17.831 kN-m

15.475 kN-m

Ref

File

By

Print Run 1 of 1 STAAD.Pro

Sheet No

Part

Job Title

Client

Chd

05-Jan-2017 10:21

-4.742 kN-m

39.357 kN-m

-0.866 kN-m

38.790 kN-m

27.990 kN-m

56.405 kN-m

27.990 kN-m

24.894 kN-m

5.952 kN-m

18.378 kN-m

1.712 kN-m

14.094 kN-m

Rev

1

Date21-Oct-16

Structure1 Guillermo PFC

Print Time/Date: 05/01/2017 11:17 V8i (SELECTseries 6) 20.07.11.70

45.623 kN-m

14.094 kN-m

Ref

File

By

7.031 kN-m

24.894 kN-m

Sheet No

Part

Job Title

Client

Chd

05-Jan-2017 10:21

Print Run 1 of 1 STAAD.Pro

17.831 kN-m

26.195 kN-m

-0.331 kN-m

Job No

Software licensed to Arup

Date/Time

Load 7 : Bending Z Moment - kN-m

14.094 kN-m

-20.511 kN-m

Rev

1

Date21-Oct-16

-1.556 kN-m

28.638 kN-m

27.990 kN-m

0.293 kN-m

Sheet No

Structure1 Guillermo PFC

Print Time/Date: 05/01/2017 11:17 V8i (SELECTseries 6) 20.07.11.70

7.031 kN-m

24.894 kN-m

Ref

80.436 kN-m

38.790 kN-m

Load 6 : Bending Z Moment - kN-m

24.894 kN-m

-4.380 kN-m

Part

File

By

-0.258 kN-m

39.286 kN-m 15.546 kN-m

Job No

Job Title

Client

Chd

05-Jan-2017 10:21

Print Run 1 of 1 STAAD.Pro

17.831 kN-m

16.144 kN-m

6.196 kN-m

27.990 kN-m

-27.864 kN-m

Software licensed to Arup

Date/Time

35.206 kN-m

27.990 kN-m

0 kN-m

-27.864 kN-m

Rev

1

Date21-Oct-16

Structure1 Guillermo PFC

Print Run 1 of 1 V8i (SELECTseries 6) 20.07.11.70 Print Time/Date: 05/01/2017 11:16 STAAD.Pro

24.894 kN-m

35.266 kN-m 14.094 kN-m

Y Z X

By

-0.832 kN-m

-2.468 kN-m

24.894 kN-m

Ref

File

Load 5 : Bending Z Moment - kN-m

27.858 kN-m

0 kN-m

Part

Job Title

Client

Chd

05-Jan-2017 10:21

7.900 kN-m

-0.028 kN-m

2.318 kN-m

Job No

Software licensed to Arup

Date/Time

-1.280 kN-m

29.267 kN-m

2.774 kN-m

16.670 kN-m

Rev

1

Date21-Oct-16

17.831 kN-m

8.446 kN-m

0.137 kN-m

24.894 kN-m

16.735 kN-m

-1.639 kN-m

14.094 kN-m

Sheet No

Structure1 Guillermo PFC

Print Time/Date: 05/01/2017 11:16 V8i (SELECTseries 6) 20.07.11.70

14.094 kN-m

0.327 kN-m

24.484 kN-m

14.094 kN-m

By

7.031 kN-m

24.894 kN-m

Ref

File

20.505 kN-m

0 kN-m -20.511 kN-m

Part

Job Title

Client

Chd

05-Jan-2017 10:21

Print Run 1 of 1 STAAD.Pro

17.831 kN-m

18.619 kN-m

Job No

Software licensed to Arup

Date/Time

0.018 kN-m

18.548 kN-m

14.094 kN-m

Rev

1

Date21-Oct-16

Print Time/Date: 05/01/2017 11:16 STAAD.Pro V8i (SELECTseries 6) 20.07.11.70

7.031 kN-m

Y Z X

Sheet No

Structure1 Guillermo PFC

Load 4 : Bending Z Moment - kN-m

20.505 kN-m

-40.646 kN-m

Part

Job Title

Client

27.858 kN-m 0 kN-m

-7.777 kN-m

-40.646 kN-m

120.023 kN-m 90.366 kN-m

Load 3 : Bending Z Moment - kN-m

13.897 kN-m

0 kN-m

-7.777 kN-m

119.929 kN-m

84.817 kN-m

Load 2 : Bending Z Moment - kN-m

13.897 kN-m

Print Time/Date: 05/01/2017 11:18 V8i (SELECTseries 6) 20.07.11.70

Print Run 1 of 1 STAAD.Pro

Print Time/Date: 05/01/2017 11:18 V8i (SELECTseries 6) 20.07.11.70

Print Run 1 of 1 STAAD.Pro

Print Time/Date: 05/01/2017 11:18 V8i (SELECTseries 6) 20.07.11.70

Print Run 1 of 1 STAAD.Pro

Print Time/Date: 05/01/2017 11:18 V8i (SELECTseries 6) 20.07.11.70

Print Run 1 of 1 V8i (SELECTseries 6) 20.07.11.70 STAAD.Pro

Load 16 : Bending Z Moment - kN-m

Chd

05-Jan-20


FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane GUILLERMO GARCÍA ARROYO 08168

FROM THE HOUSE TO THE CITY

Casa-Taller para Hedi Slimane

ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM FEBRERO 2017

AULA PFC ARANGUREN

TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN

GUILLERMO GARCÍA ARROYO 08168

CONSTRUCCIÓN II SECCION CONSTRUCTIVA E_1:50

4.00

4.00

4.00

4.00

4.00

DETALLE e1:10 1_Perfil de Aluminio EA-U260G 2_Poliuretano proyectado e: 4.5 cm en forjados e: 30mm en paneles verticales 3_Viguetas de sección n T: 146x70 mm, con placas 116x60x6 (((soldadas?))) cada 300mm en su cara inferior 4_Viga Aluminio de sección en doble T hueca 200x100 mm 5_... ¿placa? 6_Viga Aluminio de sección en doble T hueca 200x100 mm

4.00

4.00

4.00

4.00

DETALLE e1:10 1_Perfil de Aluminio EA-U260G 2_Poliuretano proyectado e: 4.5 cm en forjados e: 30mm en paneles verticales 3_Viguetas de sección n T: 146x70 mm, con placas 116x60x6 (((soldadas?))) cada 300mm en su cara inferior 4_Viga Aluminio de sección en doble T hueca 200x100 mm 5_... ¿placa? 6_Viga Aluminio de sección en doble T hueca 200x100 mm 7_Rastreles...¿? sujetan el falso techo... 8_Tirantes en forjado. Cables Acero 9_Lámina Neopreno entre perfil de Aluminio EA-U260G y pilar de aluminio 10_Pilar en cruz de aluminio extruido 112x112 mm e:7 mm con vaina de pilar 120x120 mm e:2 mm 11_Suelo ¿? 12_Rastreles... ¿? sujetan el falso techo 13_Plancha de aluminio e: 4 mm nervada con viguetas

DETALLE e1:10 1_Perfil de Aluminio EA-U260G 2_Poliuretano proyectado e: 4.5 cm en forjados e: 30mm en paneles verticales 3_Viguetas de sección n T: 146x70 mm, con placas 116x60x6 (((soldadas?))) cada 300mm en su cara inferior 4_Viga Aluminio de sección en doble T hueca 200x100 mm 5_... ¿placa? 6_Viga Aluminio de sección en doble T hueca 200x100 mm 7_Rastreles...¿? sujetan el falso techo... 8_Tirantes en forjado. Cables Acero 9_Lámina Neopreno entre perfil de Aluminio EA-U260G y pilar de aluminio 10_Pilar en cruz de aluminio extruido 112x112 mm e:7 mm con vaina de pilar 120x120 mm e:2 mm 11_Suelo ¿? 12_Rastreles... ¿? sujetan el falso techo 13_Plancha de aluminio e: 4 mm nervada con viguetas

DETALLE e1:10 1_Perfil de Aluminio EA-U260G 2_Poliuretano proyectado e: 4.5 cm en forjados e: 30mm en paneles verticales 3_Viguetas de sección n T: 146x70 mm, con placas 116x60x6 (((soldadas?))) cada 300mm en su cara inferior 4_Viga Aluminio de sección en doble T hueca 200x100 mm 5_... ¿placa? 6_Viga Aluminio de sección en doble T hueca 200x100 mm 7_Rastreles...¿? sujetan el falso techo... 8_Tirantes en forjado. Cables Acero 9_Lámina Neopreno entre perfil de Aluminio EA-U260G y pilar de aluminio 10_Pilar en cruz de aluminio extruido 112x112 mm e:7 mm con vaina de pilar 120x120 mm e:2 mm 11_Suelo ¿? 12_Rastreles... ¿? sujetan el falso techo 13_Plancha de aluminio e: 4 mm nervada con viguetas

5 1


Type: Culture Client: Competition Location: Cabo de Gata, Spain Date: 2015

Communitis Natura Pladur Nat. Competition I would want to create the most beautiful

A great translucent skeleton, with a clear glass

possible space that dignifies the pleasant

skin provides hostess facilities with distinctive

landscape of Cabo de Gata (spain) .

steal frame articulating the space.

The most luminous space, easier to understand

Direct lighting would enter and flow around our

and to use.

space, compact and flexible, understandable

I imagine it like a stone, carved with care, the

and easy , carved and beautiful.

sun would shine. The outside inside, where each visit would be celebrated. A great translucent skeleton, with a clear glass skin.

5 2


S

i w beau the gata easi imag care

wh cele skel gre cov facil dire flow flex carv

5 3


5 4


5 5


Type: Culture Client: Competition Location: Cabo de Gata, Spain Date: 2015

Int. Wildcare Centre Kruger National Park The program consists of an International

The dream consists of a community. A place

WIldcare Centre located in Kruger National Park

where tourist and scientists can help each

(South Africa).

others.

Integrated

with

the

local

materials

and

Meanwhile the platform provides the people a

developing a sustaibale design, the project

scenario to share, communicate and live.

flow like a big platform over the ground, where

A piazza of piazzas.

species will feel more natural when treated, but covered with the wooden structures.

5 6


an er ark

.a sts

als gn, rm will ut es.

the re,

5 7


Some other projects... Name: Cátedra Blanca National Student Comp. Type: Nature and Animal Conservation Client: Competition Location: Kruger National Park, South Africa Date: 2015

C Á T Erequires D R A BaLprofound A N C A thinking To design a nursery NATIONAL STUDENT COMPETITION

on educational programs and the constant change of child patrons through their lives.

to design a nursery requires a profound onto educational Having this on mind,thinking the idea is design a small programs and the constant change city, where children will grow facing different of child patrons through their lives.

situations meanwhile y arethe advancing having this onthemind, idea is to design a small city, where children courses…but how? will grow facing different situations Following the archictectural aesthetics, the me anwhile the y are advan cing spaces courses…but seem individual how? but communicate f olmove low intoglettdifferent h e a rc piazzas h i t e c t uappear, ral inside, and aesthetics, the spaces seem individual so the nursery is widely lighted and joyfully but communicate inside, and move to organized. let different piazzas appear, so the nursery is widely lighted and joyfully organized.

5 8


5 9


Name: Rebel Manifesto Type: Retail Client: School Location: Paris, France Date: 2014

6 0


61


Publications Name: Establecer el orden del espacio. "Stablishing the order in space". Best works during Alberto Campo Baeza`s 2013 Class. Type: Religious Location: Nisida Island, Naples, Italy. Date: 2013 + Alberto Campo's office website: https://www.campobaeza.com/

6 2


Name: 115 días Magazine. Shopping. Best projects under José González Gallegos` 2014 school year Type: Retail Location: Paris, France Date: 2014 + Gallegos office website: http://www.arangurengallegos.com/ag/portfolio_page/biography/

6 3


Recommendation Letters

6 4


6 5


Maja Belic, Senior Designer Consulting Planning Arup London

I´ve had the chance to work alongside Guillermo during the Lima2019 Pan American Games project where he has demonstrated the ability to be extremely diligent, organized, and consistent with the high quality of work he produces. His ability to communicate clearly and directly can be seen in his work and how he coordinates between our team and with various FAs. Guillermo is completely able to work independently and shows self-motivation to meet the requirements of the project. Guillermo observes and creates logical next steps whilst also knowing when to reach out for advice or consult specialists. I completely trust the work that Guillermo produces knowing it will be of a high standard with consideration to all aspects. I have often used Guillermo´s work as an example for the rest of the Overylay team due to its high quality and as he is usually far advanced than the rest of the team. In a fast pace project with limited resources this skill set is critical to the team and success of the project. Guillermo has an extremely friendly demeanor, easy to work with and has been able to connect and get along with everyone on the team bring fun and joy to an otherwise stressful project. To sum up, if I were to select a team for a future project Guillermo would be one of the first people I would want as part of the core group. The work he produces and his attitude to his work demonstrates that he deserves to be raised to the next grade in Arup. Guillermo is very good at focusing on this own work and hitting the objectives set for his packages far within the time required. He should use the additional time to advance other skill sets or develop other objectives he may have. Perhaps using his Project Management skills, he may be suited to assist in document control or team management. If the opportunity arises, I suggest Guilermo would be very well suited to relocate to London after the project should that be something he would wish to peruse. The diversity of the London office and access to the various Arup groups will give Guillermo a chance to use both his Architecture and Project Management degrees and develop them in an accelerated path.

Maja Belic

6 6


Alberto Campo Baeza Alberto Campo's office website: https://www.campobaeza.com/

6 7


Hidetoshi Sawa, Partner. Vo Trong Nghia Architects. Vo Trong Nghia Architectss` website: http://votrongnghia.com/

6 8


JosĂŠ Antonio Ramos, Vicens & Ramos Architecture Practice http://www.vicens-ramos.com/es/

6 9


Guillermo GarcĂ­a Arroyo // 2019


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.