Portfolio Guillermo GarcĂa
+(51) 986 860 633 / +(34) 609 84 73 09 guillermo.garcia@arup.com UKDT Lima 2019 PanAm Games office - Arup
Portfolio Info Year Projects Pages
2019 13 70
Professional Project List Lima PanAm Games 2019, Lima Barclays Relocation Offices, Madrid Andorra Els Falguero, Andorra Adunia Restaurant, Madrid Bamboo Forest. Gallery MA Pavilion, Tokyo Private House, Ho Chi Minh City FPT University, Ho Chi Minh City Sherman Contempary Art Foundation, Sydney Diamond Island Community Hall, Ho Chi Minh City Student Project List From the house to the city, Paris Communitis Natura, Cabo de Gata International Wildcare Center, Kruger National Park Nursery in Rembrandtplein, Amsterdam Awards and Publications
Guillermo is part of the Arup Design Team assigned in Lima, Peru, as well as the Project Management team in Spain. His main functions in Lima (LTA finishing in September 2019) include all RIBA stages 0 to 7, as a consultant on two of the venues that will be part of Lima PanAm Games 2019.
Guillermo García Architect (BSc. + MSc.) Project Manager
Education MSc. in Project Management (PMP Certified in 2019) Universidad Politécnica de Madrid BSc + MSc. in Architecture Superior Technical School of Architecture of Madrid (Etsam, UPM)
Achievement of high grades in Geometry and Differential calculus applied in Architecture.
Green Practice and Future City Diploma Tongji University, Shanghai, China.
International Student Scholarship to participate in researches and practices.
Parametric Architecture In agreement with The Barlett University of London, Madrid. Rhinoceros + Grasshopper3d, conducted by Frikearq. Science Bachelor
Completed with Honors (9,9/10) Nuestra Señora de La Merced, Madrid.
2
In Madrid, his main functions include Project Management, Technical Assessment, life-cycle assessment (LCC) and BIM Assistance Management. During his career, Guillermo has worked in several parts of the world, including Vietnam, China, and Europe. Experienced in working with local standards and cultures, he is able to work from the small to the large scale projects in all phases from design to construction. His ability to mix aesthetics and management gives a holistic point of view to every project, not losing the sight of the project with the city and every client´s needs.
Publications & Recognitions First Prize Madrid at Pladur National Competition for an Interpretation Centre of Nature and Plantation Research in Cabo de Gata, Spain.
Skills Proficiency in: - Revit - InDesign - Illustrator - Photoshop - Autocad
First Accesit at 12th Cátedra Blanca National Competition - F. Advanced in: J.S.Oíza for a Nursery School in - Rhinoceros + Grasshopper Rembrandtplein (Amsterdam). - 3ds Max + Vray Most innovative and sustainable - Google Sketchup + Vray design Tongji University 2014, - Presto (Cost Management) reactivating Shikumen neibourg- - Primavera hood in Shanghai.
CONCURS D’IDEES
COMPLEX MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA
Lima 2019 Pan Am Games
Barclays. Office Relocation
Andorra els falguero
Lima
Madrid
Andorra
Pag. 04
Pg. 8
Pg. 10
Adunia Restaurant
Bamboo Forest
Private House
Madrid
Gallery MA Pavilio, Tokyo
Ho Chi Minh City
Pg. 14
Pg. 18
Pg. 22
FPT University
Green Ladder
Ho Chi Minh City
Sydney
Pg. 26
Pg. 28
INTERNATIONAL A R Q U I D E AS S T U D E N T COMPETITION
NOVEMBRE 2016 | 2
Diamond Island Community Hall
Ho Chi Minh City t h e p rog r a m con s i s t s of a n Pg. 34 in t e rn at ion a l wil d c are c e n t e r located in kruger national park (southafrica).
the dream consists of a community. a place where tourist and scientists can help each others.
integrated with the local materials P L A D U R N A T I O N A L and developing a sustainable design, STUDENT COMPETITION the project flows like a big platform i would want to create the most over the ground, where species will beautiful possible space that dignifies feel more natural when treated, but the pleasant landscape of cabo de covered with the wooden structures.
gata (spain) . the most luminous space, meanwhile the platform provides the easier to understand and to use. i p e o p l e a s c e n a r i o to s h a imagine re, it like a stone, carved with communicate and live.
care, the sun would shine.
a piazza of piazzas. the outside inside,
FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM MARZO 2017
AULA PFC ARANGUREN
TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN
GUILLERMO GARCÍA ARROYO 08168
From the house to the city
Communitis Natura
Paris
Cabo de Gata
Pg. 40
Pg. 52
w h e r e e a c h v i s i t wo u l d b e celebrated. a great translucent skeleton, with a clear glass skin . the great skeleton, stell frame and covered with drywall, hoste ss WIldcare Centre facilities and International articulates the space . direct lighting would entry and Kruger National Park flow around our space, compact and flexible , understandable and easy , Pg. 56 carved and beautiful.
3
Lima 2019 Pan-Am Games As part of the government-to-government agreement between Peru and United Kingdom, Arup is committed to provide technical assistance to guarantee the successful delivery of the Games. Guillermo’s role is giving temporary and permanent infrastructure technical assurance. As part of the Overlay team, he is designing and coordinating the Games operation on Punta Rocas Complex (Second High Performance Center for Surf in the World and first Public one) and Lunahuana (Canoe Slalom and Extreme Slalom) venues. Involved in all RIBA stages 0 to 7, from the initial stages, concept design to procurement, overseeing construction and finally site management during games time in July / August 2019. As part of the challenges faced, Guillermo, despite being his first games, has been able to adapt to a constantly changing work environment, elaborating dozens of Overlay Book revisions: •
25 complete updates of operational packages for four different venues
•
Deep understanding and lessons learned, saving 70% of unnecessary overlay commodities, thanks
to an enriched multidisciplinary and collaborative approach towards the use of spaces. •
Design management on one of the most important live venues, enhancing experience and sightlines
for spectators, allowing more spectators to attend the event, as well as improving both crowd and Functional Areas flow. •
Deep understanding on Surf, Canoe Slalom, Extreme Slalom, Modern Pentathlon, Powerlifting,
Rugby and Baseball competitions, specially on sports competition, common domain use of space, live and ENG broadcasting, security, and spectator flow matters. Type: Major Event Client: Lima 2019 / COPAL Location: Lima, Peru Date: 2017-2019
4
A3 (420x297) E1:500 DESCRIPCION DESCRIPTION
COLOMBIA
CAMPO DE JUEGO FIELD OF PLAY ATLETAS ATHETES
1 ANCASH
ECUADOR
OFICIALES TECNICOS TECHNICAL OFFICIALS BROADCAST TRANSMISIONES
PRENSA PRESS
FAMILIA / JUEGOS GAMES FAMILY
ESPONSOR SPONSOR OPERACIONES OPERATIONS
SEGURIDAD SECURITY TRANSPORTE TRANSPORT
LIMA
BRASIL
CEREMONIAS CEREMONIES SERVICIO ESPECTADORES SPECTATORS SERVICE
ESPECTADORES SPECTATORS ESPACIO TECNICOS TECNICAL SPACES
VILLA DEPORTIVA
2
ESPACIO NO DISPONIBLE SPACE NOT AVAILABLE
M NA PA
VALLAS DE SEGURIDAD/ S
NA ICA ER
3
VALLAS ALTAS HIGH FENCE
4
VALLAS BAJAS LOW FENCE PERIMETRO DE SEGURIDAD SAFETY PERIMETER
5
LOCALIZACIÓN
REVISIO
DATE
REVIEW
27/03/2018
P.M.H.V.
01
28/06/2018
P.M.H.V.
02
29/08/2018
P.M.H.V.
03
12/10/2018
P.M.H.V.
04
18/12/2018
P.M.H.V.
00
ICA
INFRAESTRUCTURA TEMPORAL
ESC.1/1:50000
N
OCEANO PACIFICO
FECHA
N°
BOLIVIA
REVISION / APROBACIÓN REVIEW / APPROVAL
CHILE
PERCY MIGUEL HUAMÁN VÁSQ CAP N°7667
UCT U TR R
.
V.B
R
A
L
A
F RA IN E
ARQ. PERCY H CAP N°7
S
T
O
E M P
ROBERTO VON TORRES CIP N°27376
360 M
ING. ROBERTO V CIP N°27 ENTIDAD/ ENTITY
13
5M
5M
26
TA
UN
P YA LA A P AS DA ROC
RA
T EN
FOP1.10: SHORTBOARD LONGBOARD SUP
UBICACIÓN KEY PLAN
FOP1.20: SUP RACE PL
AY
AP
UN
TA
RO
CA
S
OCEANO PACIFICO
BUJAMA - LBU
4
LUNAHUANA - LUN
5
PARACAS - YCP
SCOREBOARD VIDEOBOARD
Competencia
Entrenamiento
EVS1.07
EVS31.00
SPP7.01
BRD5.00
EVS32.00
CAMIONES HB
DOP33.00
PRS31.00
BRD1.12
PRS30.00
TEC1.00 RADIOFRECUENCY TEC7.00 TOWER (EN CUBIERTA)
FO
P6 .0 0
PISCINA
BRD1.13 BRD3.00
PR S2 .00
VEO1.00
MED33.00
DESCRIPTIO
P.M.H.V.
28/06/2018
P.M.H.V.
OVERLAY BOOK
02
29/08/2018
P.M.H.V.
FOR DT ASSEMB
03
12/10/2018
P.M.H.V.
OVERLAY BOOK
04
18/12/2018
P.M.H.V.
OVERLAY BOOK
OVERLAY BOOK
FIRMA SUBSCRIPTION
INFRAESTRUCTURA TEMPORAL
TEC30.00 REVISION / APROBACIÓN TEC31.00 REVIEW / APPROVAL PERCY MIGUEL HUAMÁN VÁSQUEZ TEC33.00 CAP N°7667 MED33.00
ARQ. PERCY HUAMÁN CAP N°7667
S
UCT U TR R
.
V.B
R
T
SPO30.00 SPO31.00 SPO32.00
SPO1.00
DESCRIPCIO
REVIEW
27/03/2018
01
F RA IN E
MED4.00
BRM3.00
REVISION
DATE
00
SPO33.00
CAT3.00
FECHA
N°
.00 S2 SP
BRD5.00
PERCY MIGUEL HUAMÁN V
PERIMETRO DE SEGURIDAD SAFETY PERIMETER
SPO33.00
MED4.00
S
P P7 .0 1
DIR. TEC. COMP.
S
P O5 .05
VALLAS BAJAS LOW FENCE
TEC10.00
VEO2.00
MED33.00
SPO3.03
0
DEVELOPED BY
A
T4 .01 .0 2
SPO3.00
.00 D3 ME
S4 .0
C CA AT4
T
E C5 .0 0
PR
SPO33.00
SPO3.02 CAT3.00
SPO4.05
P P RT3 PR RT3 0.0 T3 1.0 0 2.0 0 0
SPO3.05
PR
T1 .0 0
VALLAS ALTAS HIGH FENCE
PR
MED4.00
PR
BD
TEC3.00
R4 .0 0
DETAILED D
ESPACIO NO DISPONIBLE SPACE NOT AVAILABLE
DOP8.00
BRD1.00
PR T1 .02
STATUS OF PROJECT
VALLAS DE SEGURIDAD/ SECURITY FENCES
T 1.0 0
LOCATION
ESPECTADORES SPECTATORS ESPACIO TECNICOS TECNICAL SPACES
BRD6.00
SU - SU TITULO DE LAMINA
STATUS DEL PROYECTO
CEREMONIAS NOMBRE DEL ARCHIVO CEREMONIES FILE NAME SERVICIO ESPECTADORES E-PRO-OVL-LIM-AR-G-SU-PL SPECTATORS SERVICE
PRS3.00
S1 .0 0
100
PRO - PUNTA
DRAWING TITLE
SEGURIDAD SECURITY TRANSPORTE TRANSPORT
FO
75
SPORT / DISCIPLINE
ESPONSOR SPONSOR OPERACIONES OPERATIONS
EVS30.00
P7 .00
50
DEPORTE / DISCIPLINA
FAMILIA / JUEGOS GAMES FAMILY
SPO31.00
SPO30.00
25
VENUE
EL PROYECTO DE LEGADO ESTÁ SUFRIENDO ALTERACIONES. EL PROYECTO DE OVERLAY DEBERÁ SER ADAPTADO AL NUEVO PRENSA LAYOUT TAN PRONTO COMO SEA RECIBIDO. PRESS
MED2.00 28/07/2019 - 04/08//2019 MED1.00 28/07/2019 - 04/08/2019
640
0m
INSTALACIÓN
OFICIALES TECNICOS TECHNICAL OFFICIALS BROADCAST TRANSMISIONES
RB VANs
SPS1.00
3
BR D2 .0 0
Butacas temporales
1:5000@A
GRAPHIC SCALE
CAMPO DE JUEGO FIELD OF PLAY ATLETAS ATHETES
NOTAS
L
PUNTA ROCAS - PRO
640
FECHAS PRELIMINARES
A
HUACHO - AMM
2
Butacas fijas
88 Atletas
Km 75 Panamericana Sur , Lima - 1 hora de Lima
Surf - SU
AFORO
1
CUOTA DE DEPORTISTAS
BRD1.08
CLUSTER 'E' - SEDES
UBICACIÓN
ESCALA GRAFICA
DESCRIPCION DESCRIPTION
GRUPO ELECT.
DEPORTES
O
E M P
ROBERTO VON TORRES CIP N°27376
ING. ROBERTO VON TORRES CIP N°27376 ENTIDAD/ ENTITY
P
R S4.0 0
FOP1.00
UBICACIÓN KEY PLAN
BRD5.00
PRS4
TEC12.00
1. LOS MUEBLES PRESENTADOS EN ESTE DIBUJO SON PARA REFERENCIA ESPACIAL SOLAMENTE. FF & E (MUEBLES, ACCESORIOS Y EQUIPOS) Y REQUISITOS DE TECNOLOGÍA A SER PROPORCIONADOS POR AFS DE LOGÍSTICA Y TECNOLOGÍA Y SERÁN REPRESENTADOS EN EL OVERLAY BOOK 4. 2. EL DISENO DE LAS RAMPAS Y ESCALERAS TEMPORALES MOSTRADAS EN ESTE DIBUJO ES SOLAMENTE INDICATIVO. EL DISENO SE DESARROLLARA CUANDO SE OBTENGA MAYOR INFORMACION ACERCA DE LA TOPOGRAFIA EXISTENTE Y OTROS FACTORES QUE INFLUYAN EN LAS CARACTERISTICAS DE ESTOS ELEMENTOS 3. LA DOTACIÓN PARA SERVICIOS HIGIÉNICOS ES REFERENCIAL. LA CIFRA FINAL DEBERÁ SER COORDINADA Y CONFIRMADA ENTRE EL CONTRATISTA Y LIMA2019. 4. EL PROYECTO DE LEGADO ESTÁ SUFRIENDO ALTERACIONES. EL PROYECTO DE OVERLAY DEBERÁ SER ADAPTADO AL NUEVO LAYOUT TAN PRONTO COMO SEA RECIBIDO.
PLAYA
PUNTA
.00
1. THE FURNITURE PRESENTED IN THIS DRAWING IS FOR SPACE REFERENCE ONLY. FF&E (FURNITURE, FITTINGS & EQUIPMENT) AND TECHNOLOGY REQUIREMENTS TO BE PROVIDED BY LOGISTICS AND TECHNOLOGY FAS AND WILL BE REPRESENTED IN OVERLAY BOOK 4. 2. THE DESIGN OF THE RAMPS AND TEMPORARY STAIRS SHOWN IN THIS DRAWING IS ONLY INDICATIVE. THE DESIGN WILL BE DEVELOPED WHEN MORE INFORMATION IS OBTAINED ABOUT THE EXISTING TOPOGRAPHY AND OTHER FACTORS THAT INFLUENCE THE CHARACTERISTICS OF THESE ELEMENTS. 3. THE NUMBER OF TOILET FACILITIES AS ILLUSTRATED SERVES AS A REFERENCE ONLY. FINAL NUMBERS OF TOILET FACILITIES TO BE COORDINATED AND CONFIRMED BY CONTRACTOR AND LIMA2019. 4. THE LEGACY PROJECT IS SUFFERING SEVERAL CHANGES. OVERLAY PROJECT TO ADAPT ITS DESIGN TO THE NEW LAYOUT AS SOON AS THE LEGACY PROJECT IS RECEIVED.
FOP2.02
ROCAS
SPO5.88
ESCALA GRAFICA
1:500@A3
GRAPHIC SCALE 0m
2
4
6
8
10
INSTALACIÓN VENUE
PRO - PUNTA ROCAS
DEPORTE / DISCIPLINA SPORT / DISCIPLINE
FOP1.00
SU - SURF TITULO DE LAMINA
DRAWING TITLE
ENLARGED PLAN STATUS DEL PROYECTO STATUS OF PROJECT
DETAILED DESIGN NOMBRE DEL ARCHIVO FILE NAME
E-PRO-OVL-LIM-AR-G-SU-PLN-L013000
OCEANO PACIFICO
DEVELOPED BY
PERCY MIGUEL HUAMÁN VÁSQUEZ
5
REV
0
FECH DATE
18/12/
ENTRADA ENTRY
DESCRIPCION DESCRIPTION
CAMPO DE JUEGO FIELD OF PLAY ATLETAS ATHETES
DESCRIPCION DESCRIPTION
FF&E SHOWN ON PLAN IS FOR ILLUSTRATION PURPOSES TO DESCRIBE THE LAYOUT OF THE TECHNICAL TABLES. FF&E TO BE PROVIDED BY LOGISTICS & TECHNOLOGY. TODO FF&E MOSTRADO EN EL PLANO ES MERAMENTE ILUSTRATIVO PARA EL DISEÑO DE LAS MESAS TÉCNICAS. FF&E SERÁ PROVISTO POR LOGÍSTICA.
PRENSA PRESS
ATLETAS ATHETES OFICIALES TECNICOS TECHNICAL OFFICIALS
FAMILIA / JUEGOS GAMES FAMILY ESPONSOR SPONSOR OPERACIONES OPERATIONS SEGURIDAD SECURITY TRANSPORTE TRANSPORT
BROADCAST TRANSMISIONES
ZONAS MIXTAS: BRD Y PRS PODIO
CEREMONIAS CEREMONIES SERVICIO ESPECTADORES SPECTATORS SERVICE ESPECTADORES SPECTATORS
PRENSA PRESS FAMILIA / JUEGOS GAMES FAMILY
OVR SPORT PRESENTATION MESAS TECNICAS
CUARTO CONTROL CRONOMETRAJE
CRONOMETRAJE Y PUNTUACION
VALLAS DE SEGURIDAD/ SECURITY FENCES VALLAS ALTAS HIGH FENCE VALLAS BAJAS LOW FENCE PERIMETRO DE SEGURIDAD SAFETY PERIMETER
TRANSPORTE TRANSPORT CEREMONIAS CEREMONIES
GANTRY (FINISH LINE)
+0.00
ESPACIO TECNICOS TECNICAL SPACES ESPACIO NO DISPONIBLE SPACE NOT AVAILABLE
ESPONSOR SPONSOR OPERACIONES OPERATIONS SEGURIDAD SECURITY
SALA DE ULTIMA LLAMADA
SERVICIO ESPECTADORES SPECTATORS SERVICE
ENTRADA ENTRY
OFICIALES TECNICOS TECHNICAL OFFICIALS BROADCAST TRANSMISIONES
CAMPO DE JUEGO FIELD OF PLAY SPORT PRESENTATION
N°
FECHA
REVISION
00
12/10/2018
P.M.H.V.
OVERLAY BOOK 3
01
18/12/2018
P.M.H.V.
OVERLAY BOOK 3
DATE
DESCRIPCION
REVIEW
DESCRIPTION
FIRMA SUBSCRIPTION
INFRAESTRUCTURA TEMPORAL
ESPECTADORES SPECTATORS ESPACIO TECNICOS PLAYA PUNT TECNICAL SPACES A ROCA
REVISION / APROBACIÓN REVIEW / APPROVAL
PERCY MIGUEL HUAMÁN VÁSQUEZ CAP N°7667
S
ESPACIO NO DISPONIBLE SPACE NOT AVAILABLE
ARQ. PERCY HUAMÁN CAP N°7667
SERV. MÉDICOS ATLETAS S
.
RUCTU
T
V.B
R
A
L
A
FRA I N E
R
VALLAS DE SEGURIDAD/ SECURITY FENCES
Seccion 1
FOP1.10 SHORTBOARD LONGBOARD SUP SURF
CORTE A-A
-12.20
VALLAS ALTAS HIGH FENCE
Focus Point
CIP N°27376
ING. ROBERTO VON TORRES CIP N°27376
PERIMETRO DE SEGURIDAD SAFETY PERIMETER
FOP1.20 SUP RACE
O
E M P
ROBERTO VON TORRES
VALLAS BAJAS LOW FENCE
Esc.: 1/400
Focus Point
T
ENTIDAD/ ENTITY
REVISION
N°
FECHA
00
12/10/2018
P.M.H.V.
01
18/12/2018
P.M.H.V.
02
21/01/2019
P.M.H.V.
DATE
DESCRIPCION
REVIEW
DESCRIPTION
OVERLAY BOOK 3 OVERLAY BOOK 3 UBICACIÓN KEY PLAN
OVERLAY BOOK 3
FIRMA SUBSCRIPTION
INFRAESTRUCTURA TEMPORAL REVISION / APROBACIÓN REVIEW / APPROVAL
PERCY MIGUEL HUAMÁN VÁSQUEZ CAP N°7667
RETRANSMISION COMENTARISTAS
ESCALA GRAFICA
N
1:1500@A3
GRAPHIC SCALE
ARQ. PERCY HUAMÁN CAP N°7667 INSTALACIÓN PRO - PUNTA ROCAS
FRA I N E
.
V.B
6
8
TITULO DE LAMINA
DRAWING TITLE
L
FOP DIAGRAM STATUS DEL PROYECTO STATUS OF PROJECT
A
OCEANO PACIFICO
E M P
10
SU - SURF
DETAILED DESIGN NOMBRE DEL ARCHIVO
R
T
ESPECTADORES
4
SPORT / DISCIPLINE
A
PRENSA - POSICIONES SIN MESA FF&E SHOWN ON PLAN IS FOR ILLUSTRATION PURPOSES TO DESCRIBE THE LAYOUT OF THE TECHNICAL TABLES. FF&E TO BE PROVIDED BY LOGISTICS & TECHNOLOGY. TODO FF&E MOSTRADO EN EL PLANO ES MERAMENTE ILUSTRATIVO PARA EL DISEÑO DE LAS MESAS TÉCNICAS. FF&E SERÁ PROVISTO POR LOGÍSTICA.
2
VENUE
DEPORTE / DISCIPLINA
R
S
0m
UCT U TR
O
REV
FILE NAME
01
E-PRO-OVL-LIM-AR-G-SU-FOP-ZZZ4000
FECHA DATE
DEVELOPED BY
PERCY MIGUEL HUAMÁN VÁSQUEZ
+12.35
18/12/2018
ROBERTO VON TORRES CIP N°27376
ENTRADA ENTRY
DESCRIPCION DESCRIPTION
CAMPO DE JUEGO FIELD OF PLAY
Productor
P2
Operador de audio
P3
Vision mixer
P4
Operador gráfico
Delegado Técnico Internacional
P5
Asistente de Producción
S10 Tabulador S11 Anunciador de Olas
T1
Aún por confirmar
T2
Aún por confirmar
+6.80 T3
Aún por confirmar
T4
ZONA MIXTA
P1
Juez de Jueces Juez de Competición
S9
TECHNOLOGY
T5
Aún por confirmar Aún por confirmar
T7
Aún por confirmar
T8
+7.85
P6
Anunciador (Inglés)
P7
Anunciador (Español)
P8
Operador de cámara
P9
Manager de piso
PRENSA PRESS
FAMILIA / JUEGOS GAMES FAMILY ESPONSOR SPONSOR
FOP2.00
S11
BRD5.00
S7
FOP2.00
S12
OPERACIONES OPERATIONS SEGURIDAD SECURITY TRANSPORTE TRANSPORT CEREMONIAS CEREMONIES
S1 S2 S3 S4 S5 S6 S7 S8 S9 S10
SERVICIO ESPECTADORES SPECTATORS SERVICE
VIDEO REVIEW
ESPECTADORES SPECTATORS ESPACIO TECNICOS TECNICAL SPACES ESPACIO NO DISPONIBLE SPACE NOT AVAILABLE
MED3.00
PRT30.00 PRT31.00 PRT32.00
VALLAS DE SEGURIDAD/ SECURITY FENCES
VALLAS ALTAS HIGH FENCE
SPS2.00
VALLAS BAJAS LOW FENCE
Aún por confirmar
T6
BROADCAST TRANSMISIONES
ENTIDAD/ ENTITY
OF.PROT.
ESPECTADORES
Juez de Prioridad
S8
S7
SALA DE TO´s
SPORTS PRESENTATION
S1-S5 Oficiales técnicos S6
ING. ROBERTO VON TORRES CIP N°27376 ATLETAS ATHETES OFICIALES TECNICOS TECHNICAL OFFICIALS
SPO30.00 SPO31.00
FOP Schedule SPORTS
PRT1.00
PRT1.00
PERIMETRO DE SEGURIDAD SAFETY PERIMETER
CAT4.01 CAT4.02
+6.80
P6
UBICACIÓN KEY PLAN
DATE
SPP7.01
P1 P2
DESCRIPCION
REVIEW
DESCRIPTION
00
12/10/2018
P.M.H.V.
OVERLAY BOOK 3
01
18/12/2018
P.M.H.V.
OVERLAY BOOK 3
P7
TEC5.00
REVISION
FECHA
N°
PRS1.00 FIRMA SUBSCRIPTION
INFRAESTRUCTURA TEMPORAL
P3 P4
REVISION / APROBACIÓN REVIEW / APPROVAL
Aún por confirmar
PERCY MIGUEL HUAMÁN VÁSQUEZ CAP N°7667
PRS31.00 SPP31.00 BRD31.00 PRT31.00 VEST. ATLETAS
ARQ. PERCY HUAMÁN CAP N°7667
SPP7.01
SPO5.44
SPO5.44
R
A
G2
L
FRA I N E
G2
O
E M P
ROBERTO VON TORRES CIP N°27376
LAV. WETSUITS SEC. WETSUITS
PRS1.00
ING. ROBERTO VON TORRES CIP N°27376
ENTIDAD/ ENTITY
SPO5.44
LOUNGE ATLETAS
P5 P8 P9
CONTROL EQUIP. DEPORTIVO
SCOREBOARD VIDEOBOARD
ESCALA GRAFICA
1:125@A3
GRAPHIC SCALE
+0.00
G2
T
ALMACÉN WETSUITS
+1.85
V.B
S
BDR5.00
.
UCT U TR
A
PRT5.00
SPO30.00 SPO31.00 SPO32.00
R
SPORT INFO
PRS30.00 SPP30.00 BRD30.00 PRT30.00
BDR5.00
FOP6.00
0m
UBICACIÓN KEY PLAN
1
2
3
4
5
INSTALACIÓN
FOP7.00
VENUE
PRO - PUNTA ROCAS 6
5
4
3
2
DEPORTE / DISCIPLINA
1
SPORT / DISCIPLINE
SU - SURF PRS1.00
TITULO DE LAMINA
BRD4.00
DRAWING TITLE
CORTE AA´
SPO5.05 PRS4.00
PRS4.00
STATUS DEL PROYECTO
STATUS OF PROJECT
Seccion 1 Esc.: 1/125
NOMBRE DEL ARCHIVO FILE NAME
S
A ROCA
PLAYA
FF&E SHOWN ON PLAN IS FOR ILLUSTRATION PURPOSES TO DESCRIBE THE LAYOUT OF THE TECHNICAL TABLES. FF&E TO BE PROVIDED BY LOGISTICS & TECHNOLOGY. TODO FF&E MOSTRADO EN EL PLANO ES MERAMENTE ILUSTRATIVO PARA EL DISEÑO DE LAS MESAS TÉCNICAS. FF&E SERÁ PROVISTO POR LOGÍSTICA.
6
ESCALA GRAFICA GRAPHIC SCALE 0m
1
2
3
N
1:250@A3 4
5
INSTALACIÓN VENUE
PRO - PUNTA ROCAS DETAILED DESIGN DEPORTE / DISCIPLINA
BDR5.00
PUNT
SPORT / DISCIPLINE
TITULO DE LAMINA
SU - SURF REV
DRAWING TITLE
02 E-PRO-OVL-LIM-AR-G-SU-STN-ZZZ7000 STATUS DEL PROYECTO
FOP MULTILEVEL PLAN
STATUS OF PROJECT
FECHA
DETAILED DESIGN
DEVELOPED BY
NOMBRE DEL ARCHIVO DATE FILE NAME
E-PRO-OVL-LIM-AR-G-SU-FOP-MTL4000 21/01/2019
FOP1.10 PERCY MIGUEL HUAMÁN VÁSQUEZ
DEVELOPED BY
PERCY MIGUEL HUAMÁN VÁSQUEZ
REV
01 FECHA DATE
18/12/2018
7
Barclays PM & CM Consultancy Services Project and Cost Management to relocate Barclays to a new site with an area estimated at 2,000 sqm, called Project Columbus. Barclays is intending to certify the Project as LEED Gold. As part of the scope, Guillermo was part of an
branding opportunities, MEP, daylight, cooling and fresh air capacities available, power, generator support, diverse IT routes through the buildings, security, etc. Furthermore, it also included management of contracts and value engineering report cost studies.
entire year project process, with two different stages.
Stage 2. Full Fit Out. Involving design,
and
procurement (Award and Contract sign off for Stage 1. Consisting on due diligence reports
final long lead package and for trade package).
and outline scheme designs, with cost plan, program and test fits.
All these stages were of high value to Guillermo,
Part of the information to be assessed was
as he was able to deal on a daily basis with
Architecture, refurbishments, landmark and
many stakeholders, learning how to deal with demanding deadlines.
Type: Commercial Client: Barclays Location: Madrid, Spain Date: 2017
8
9
Type: Residental & Commercial Client: Reig Capital Location: Els Falguero, Andorra Date: 2016
Els Falguerรณ Mixed use, ARUP+OAB Project Management service for a 37,000 sqm hotel and apartments building and a 13,700 sqm office building in Andorra la Vella, Andorra. Arup provided consultancy services in sustainability, faรงade design and fire protection as well as Project Management in this competition. Guillermo was part of the competition team for a multipurpose center in a very constrained location, marked by adverse weather conditions, and an entire facade facing north to a cliff. Being part of a multidisciplinary team the focus of the project was holistic, so all the different disciplines were involved in all stages. This enabled Guillermo to participate in design management meetings with OAB, to find solutions to the design of two large volumes, their circulation, layouts, and better ways to enhance a bigger portfolio of different spaces to be sold by the client in the future.
10
UN MON A L’INTERIOR El tret principal del solar es caracteritza per la seva forma allargada alternant les sortides cap al carrer amb el retrocés a la muntanya, provocant un diàleg amb la muntanya de forma intermitent. Així es generen dos grans espais oberts de llum que arriben fins als dos patis on s’ubica el gimnàs i l’spa. Proposem instal·lar un gran mur vegetal de gran bellesa que arribaria a les cotes més baixes del edifici.
restaurant, locals comercials, etc; els soterranis a usos propis del servei de l’hotel; les plantes pis ubiquen les habitacions i l’última planta molt més lúdica s’hi situa el skybar. L’hotel està connectat verticalment principalment per dos nuclis d’escales i ascensors seguint les normatives d’incendis més exigents diferenciant els nuclis dels clients i els nuclis de serveis.
connector entre les dues funcions ben diferenciades, l’hotelera i la residencial.
El programa del projecte respon a la tipologia d’hotel de 5 estrelles Gran Luxe. A trets generals, les plantes a nivell es destinen als usos més públics de recepció,
L’Hotel comparteix amb els Apartaments un dels espais que requereix una superfície més elevada, el gimnàs/spa. Aquest actua com a ròtula i element
mirador a la plaça pública del ROC.
En planta tercera hi trobem l’accés al SPA, les sales de reunions i esdeveniments i les residències que contenen una superfície inferior. La circulacions, ben estudiades, per evitar el creuament entre clients de l’Hotel i els residents dels apartaments. En aquesta planta elevada hi trobem el bar i la seva terrassa que actua com a
CONCURS D’IDEES
NOVEMBRE 2016 | 2
COMPLEX SECTORMULTIFUNCIONAL B ESTUDIS DE FAÇANES AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA
PANELAT FUSTA
PAVIMENT PEDRA
VIDRE
PAVIMENTS FUSTA
LLAUTÓ DAURAT
FUSTA FAÇANA
Època freda (dia)
MÒDULS FAÇANA EDUFICI PARCEL·LA 5
Època freda (nit)
MÒDULS FAÇANA EDIFICI PARCEL·LA 4 Època càlida (dia)
Època càlida (nit)
ALÇAT SECTOR B
MÒDULS FAÇANA EDIFICI PARCEL·LA 6 ESTUDI DE VISUALS I IMPACTE VOLUMÈTRIC La proposta aconsegueix maximitzar i privatitzar les visuals de cada una de les diferents habitacions i apartaments. S’ha posat especial atenció en els edificis (Sector B) de les parcel·les 4,5,6 per tal d’evitar i entrar en conflicte amb les visuals de les estàncies de l’Hotel i de les Residències situat en la parcel·la contigua. Per tant les dues propostes dialoguen entre si mitjançant
la intimitat del espai interior. -Forma ameboide de la proposta, mai arbitraria, respon a la intenció de creació de nous recorreguts públics i a l’afavoriment de les vistes del edifici HOTEL /APARTAMENTS situat en les parcel·les 1, 2, 3, -Deixem lliure i recuperem l’espai que envolta el Roc i la Clínica dotant de
les seves formes per tal emfatitzar les seves virtuts sense, en cap cas, malmetre
valor el seu entorn.
IMATGE SPA
CONCURS D’IDEES
-La disposició orgànica de la planta i l’àmbit d’afectació dels recorreguts origina la creació d’un gran espai central semiobert i protegit que es converteix en un nou Atri comercial on poder visualitzar el Roc i el nou espai públic que es crea al seu voltant
ESTUDI DE FAÇANA. MODULARITAT SEGONS ORIENTACIÓ El tractament de les façanes dels nous edificis es confia al sistema constructiu de prefabricats, permetent així la modularitat, que consisteix en fer els tancaments de façana amb dues pells: una interna de vidre i una externa formada per lames verticals de fusta, de manera que fan l’efecte d’una cortina i semblen ingràvides. Les lames verticals augmenten la seva densitat en aquelles façanes que ho necessitin. Degut a factors climàtics, la seva transparència i d’orientació es deixen quasi bé sense elles allà on no es requereixi. La pell de vidre d’aquest edificis, provoca un augment de la sensació d’amplitud dels vianants, doncs ens trobem en una secció del carrer on els edificis veïns són molt propers.
IMATGE PENTHOUSE IMATGE DESDE PLANTA SEGONA CAP AL PATI CENTRAL
COMPLEXCOMPLEX MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA CONCURS D’IDEES
IMATGE CANTONADA HOTEL I OFICINES IMATGE DES DE ATRI D’ACCÉS
NOVEMBRE 2016 | 7 NOVEMBRE 2016 | 10
11
P1
P2
P3
Per la via principal hi trobem els accessos “peatonals” als diferents nuclis de comunicació de les residències com també els accessos rodats privats,
En planta segona, la que es troba al mateix nivell de la rotonda superior, hi trobem el programa següent: el Lobby d’entrada a l’Hotel, la recepció,
En planta tercera hi trobem l’accés al SPA, les sales de reunions i esdeveniments i les residències que contenen una superfície inferior. La circulacions,
per entrar mercaderies i provisions etc.
el restaurant principal, la cuina, el vestíbul d’ascensors i altres cambres de serveis. En aquesta planta també hi trobem l’entrada al gimnàs, una
ben estudiades, per evitar el creuament entre clients de l’Hotel i els residents dels apartaments. En aquesta planta elevada hi trobem el bar i la seva
superfícies que ens ajuda a connectar el programa hoteler amb el programa de les residències. A l’hotel hi podem accedir per dos punts i per dos
terrassa que actua com a mirador a la plaça pública del ROC.
En planta 1(nivell +1.049.50/+1.051,5) 1 ubica, cuina principal, càmeres frigorífiques i altres serveis associats a aquest ús; vestidors de personal, menjador de personal, despatxos del xef i governanta; zona de càrrega i descàrrega i control d’entrada de mercaderies.
nivells. L’Hotel comparteix amb els Apartaments un dels espais que requereix una superfície més elevada, el GIMNÀS/SPA. Aquest actua com a ròtula i
La planta primera té un altell (+1052,50) en el qual s’hi ubica un espai (MEP) 350 m² on es situen la gran part de les instal·lacions d’ús exclusiu de
element connector entre les dues funcions ben diferenciades, l’hotelera i la residencial.
l’Hotel
És important destacar l’accés rodat dels clients de l’hotel. Aprofitant l’existència de la rotonda hi ubiquem l’entrada al pàrquing mitjançant una
A la planta soterrani -1,-2,-3 s’hi destinen espais per a ubicació del aparcaments i espais destinats a les instal·lacions.
rampa helicoïdal.
A la planta soterrani -1,-2,-3 s’hi destinen espais per a ubicació del aparcaments i espais destinats a les instal·lacions.
1
4
3
6 5
5
7
4 3
6
2 5
2
6
7
9
3
7 8
10
8 16
1
1 9
11
10
13
11 4
2
7
12 13
12 14 17
8
14
13 9 15 15 8
15 13
17 12
21 13
20
16
13 20
1. MOLL CARGA/DESCARGA 103.60 M² 2. OFICINA DE GESTIÓ/COMPRES 27.10 3. CUINA PRINCIPAL 187 M² 4. TRACTAMENT DE RESIDUS 52.30 M² 5. MAGATZEM MENJAR/BEGUDES 87.30M² 6. MAGATZEM CUINA 66 M² 7. TECNOLOGIA DE L’INFORMACIÓ 22.8 M² 8. NUCLI DE COMUNICACIÓ 26.10 M² 9. ACCÉS A HOTEL CLIENTS PER COTA CARRER +1.050 10. ADMINISTRACIÓ DE DADES 29.40 11. VESTUARIS PERSONAL 40.60 M² 12. ACCÉS RESIDENCIES/PENHOUSE 13. LOCAL COMERCIAL 14. BUGADERIA HOTEL118.90 M² 15. RAMPA CLIENTS HOTEL 16. INSAL·LACIONS 105.80M² 17. MAGATZEM MERCADERIES PENTHOUSE 42.20 18. CARGA/DESCARGA COMERCIAL 251.60 M² 19. RAMPA PÀRQUING RESIDENCIES/PENTHOUSE 70.40M² 20. MAGATZEM COMERCIALS 24M² 21. INSTAL·LACIONS COMERCIAL 69.90 M²
10 12
11
11 10
13
1. LOBBY HOTEL 100.30 M² 2. RECEPCIÓ.CAIXES SEGURETAT.MALETES. ADMINISTRACIÓ 43.8 M² 3. LOBBY LOUNGE 265.04 M² 4. PATI 5. SERVEIS CLIENTS 6. CUINA DE PLANTA 7. RESTAURANT PRINCIPAL 352 M² 8. GIMNÀS 585 M² 9. RAMPA CLIENTS HOTEL 10. DOBLE ESPAI LOCALS 11. ISNTAL·LACIONS SPA-INSTAL·LACIONS PISCINA170 M² 12. MAGATZEMS GIMNÀS 68.30 M² 13. INSTAL·LACIONS RESIDÈNCIES 68.30 M² 14. BUGADERIA RESIDÈNCIES 215.40 M² 15. NETEJA RESIDÈNCIES 147.10 M² 16. DESPATX DIRECTOR 17. NUCLIS APART/PERNTHOUSE
14
1. DOBLE ESPAI A LOBBY HOTEL 96.10M² 2. DOBLE ESPAI A PATI 3. SALA DE SUPORT 25.60 M² 4. SALA REUNIONS 1 60.68 M² 5. SALA DE REUNIONS 2 101.2 M² 6. SALA DE REUNIONS 3 70.80 M² 7. DOBLE ESPAI A LOUNGE A SEGONA PLANTA 8. SALA DE EVENTS 101.50M² 9. CUINA DE PLANTA/CATERING 76.15 M² 10. BAR DE PLANTA 39.60 M² 11. TERRASSA 38.30 M²² 12. ACCÉS RESIDENCIES A HOTEL 13. APARTAMENTS DE 80 M² 14. NUCLIS DE COMUNICACIÓ APARTAMENTS/ PENTHOUSES 15. SPA TOTAL 749 M² 16. PISCINA SPA 100.70 M² 17. TERRASSA EXTERIOR SPA 212.83 M² 18. ZONA SAUNES SPA 103.3 M²
16
17 13
10
17 17
12
18 15
18
14
13
19
Hotel
MEP
SPA/Gimnàs
Comercial
Apartament 1 dormitori
CONCURS D’IDEES
COMPLEX MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA
NOVEMBRE 2016 | 4
A DE NOVA CENTRALITAT UN MON A L’INTERIOR
El tret principal del solar es caracteritza per la seva forma allargada alternant les calització de la zona del concurs, pel que fa la sortides orientació cap al carrer amb el retrocés a la muntanya, provocant un diàleg amb orn natural on s’ubica i les possibles visuals cap al la paisatge muntanya de forma intermitent. Així es generen dos grans espais oberts de llum an d’aquest projecte una oportunitat única per generar un fins als dos patis on s’ubica el gimnàs i l’spa. Proposem instal·lar un que arriben pament urbà d’alta qualitat urbanística, arquitectònica, gran mur vegetal de gran bellesa que arribaria a les cotes més baixes del edifici. ca i mediambiental. El programa del projecte respon a la tipologia d’hotel de 5 estrelles Gran Luxe. trets generals, les plantes a nivell es destinen als usos més públics de recepció, manera es té en consideració la totalitat delAFalgueró,
restaurant, locals comercials, etc; els soterranis a usos propis del servei de l’hotel; les plantes pis ubiquen les habitacions i l’última planta molt més lúdica s’hi situa el skybar. L’hotel està connectat verticalment principalment per dos nuclis d’escales i ascensors seguint les normatives d’incendis més exigents diferenciant els nuclis
connector entre les dues funcions ben diferenciades, l’hotelera i la residencial. En planta tercera hi trobem l’accés al SPA, les sales de reunions i esdeveniments i les residències que contenen una superfície inferior. La circulacions, ben estudiades,
dels clients i els nuclis de serveis.
per evitar el creuament entre clients de l’Hotel i els residents dels apartaments. En aquesta planta elevada hi trobem el bar i la seva terrassa que actua com a
L’Hotel comparteix amb els Apartaments un dels espais que requereix una superfície més elevada, el gimnàs/spa. Aquest actua com a ròtula i element
mirador a la plaça pública del ROC.
espais de continuïtat entre l’àrea del concurs i les unitats ó contigües.
ntervenció esdevindria llavors en forma de ferradura on el a de ser un tall artificial per convertir-se en un espai obert. ona interior podria esdevenir un espai lúdic de trobada diferents usuaris del projecte i un espai que articuli els accessos i possibles connexions transversals. La formació omenada ”el Roc” es conservaria com a un dels elements s mes rellevants dotant de major identitat al conjunt.
ria de les edificacions quedarà definida gràcies a un estudi
t de les visuals, les vistes i el assolellament.
lloc s’estudia com s’integra la volumetria edificatòria a oposant geometries que es percebin de maneres diferents punt de vista.
ó geomètrica dels volums
es proposaria també seguint
ransversals cap als punts de més interès paisatgístic de la es trenquen els volums i s’orienten les façanes per buscar les s cap al Pic Carroi, la vall del Mandriu o cap a Sant Miquel s, per exemple.
CI COM A REFERENT: cal aconseguir una solució clara i nt, justificable d’una manera rotunda intentant relacionar arcel·les existents.
AT: imatge potent, emfatitzin el seu caràcter unitari i racional alhora que cadascun tingui la seva identitat pròpia.
AR AMB EL CONTEXT: La proposta ha de respectar l’edifici de ncrementar el valor del Roc, potenciant-ne els valors i fent edin anul·lats per la nova construcció.
CESSIBILITAT i CIRCULACIONS: Considerem que una dels esoldre la dualitat i diversitat d’accessos entre els diferents difici.
NCIONALITAT: En les parcel·les 4,5,6 és indispensable per al uncionament de l’edifici i la seva adaptació a necessitats que sigui flexible, amb pocs elements fixes.
NTENIMENT i DURABILITAT: provada durabilitat, ent, sostenibilitat i bon balanç mediambiental.
fàcil
IMATGE CANTONADA HOTEL I OFICINES
2 1 4 3
uts de vianants
d’influència de vianants
DEES
PLANTA EMPLAÇAMENT E1:1000 IMATGE SPA
FOTOMONTATGE GENERAL IMATGE PENTHOUSE
PLEX MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA COMPLEX MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA CONCURS D’IDEES
12
NOVEMBRE 2016 NOVEMBRE |1 2016 | 7
Espais semiexteriors i confort exterior adaptatiu Aquesta proposta dóna un valor especial als espais exteriors i als espais semiexteriors de transició. Es proposa
Tots dos espais, pati i plaça, estan dissenyats a partir
un disseny basat en estratègies de confort exterior
d’aquestes premisses, de manera que es condicionin de
adaptatiu. Aquestes estratègies permeten aprofitar les
manera passiva aprofitant les condicions exteriors en cada
condicions climàtiques per maximitzar el confort i generar
època de l'any.
espais de qualitat per als usuaris, que puguin ser utilitzats
En els següents esquemes es pot apreciar el funcionament
durant pràcticament tot l'any, i assegurar la millora de
estacional dels patis en les diverses èpoques de l'any i es
l'experiència de l'usuari amb un baix cost econòmic i un
mostra el paper que juga el disseny de la pèrgola en funció
baix impacte mediambiental.
de les condicions climàtiques externes.
Amb aquest objectiu es proposa el disseny d'espais
.
semiexteriors basats en les següents estratègies: * Hivern: - Protecció en cas de pluja i neu - Potenciació dels guanys solars i l’ “efecte hivernacle” - Disminució de la velocitat del vent *Estiu: - Ombreig - Ventilació natural Els espais exteriors i semiexteriors de la proposta inclouen els espais amb tractament de pati que es creen entre l'edifici principal i el talús de la muntanya, així com
la plaça creada al voltant del Roc.
1
Hivern
Estiu
El pati es cobreix com a protecció en cas de pluja
El pati s’obre i s’afavoreix la ventilació creuada
o neu i per retenir l’escalfor. Possibilitat de terra
aprofitant l’aire fresc de la muntanya.
radiant.
Sun access in January 80 % of the façade has less than 2 sun hours 92% of the façade has less than 4 sun hours
Sun access in July
56 % of the façade has less than 2 sun hours 79% of the façade has less than 4 sun hours 16 | Arup | Títol de l’oferta 1
PLANTA TERCERA
PLANTA QUARTA/CINQUENA
PLANTA SIZENA/SETENA
IMATGE DE L’ENTORN DEL ROC I OFICINES
CONCURS D’IDEES
COMPLEX MULTIFUNCIONAL AL FALGUERÓ ESCALDES/ENGORDANY, PRINCIPAT D’ANDORRA
NOVEMBRE 2016 | 9
13
Type: Commercial Client: Adunia, Restaurant Location: Madrid, Spain Date: 2016
Restaurante Adunia Extudio Two-story restaurant in the center of Madrid, with two opposing atmospheres. One of them, the entrance, with daylighting on its two facades, and below, a lower level with no lighting except for narrow windows at the top. The restaurant achieves, by differentiating two environments, the element of surprise to the client, adding more variety and richness to space, and providing an environment more related to the day (light in the upper space), and night (darkness in the lower level). In the lower level, the separating cabinet, camouflaged as an upholstered wall, and the flexibility of the lamps allow an adaptation to as many configurations as needed depending on the number of guests.
14
15
16
17
Type: Exhibition Client: Gallery MA Location: Tokyo, Japan Date: 2015
Bamboo Forest Gallery MA Concept design, phisical and 3d modeling and
Throughout
construction planning for a 97 sqm pavilion
Vietnamese staff collaborated with volunteer
for the 30th-anniversary exhibition “The Asian
students in Tokyo, demonstrating how to create
Everyday. Possibilities in the shifting world� at
bamboo structure without any metal joints. The
TOTO GALLERY MA, one of the Japanese most
pavilion is a pure bamboo structure composed
influential galleries for architecture and design,
of a grid, archs and boxes. It embraces greenery
located in Tokyo.
with living bamboo planted into the boxes,
the
construction
period,
expressing the pursuit of bringing greenery
18
19
2 0
2 1
Type: Residential Client: Private Location: Ho Chi Minh City, Vietnam Date: 2016
Bamboo house Private Residence Due to Vietnam's narrow streets, this house
The semi-open staircase is enveloped by creepers,
was designed to create a comfortable living
allowing the branches and leaves to function
space in spite of the limited available space.
as a buffer layer that cuts out direct sunlight.
The site’s density only allows two sides
Moreover, the front façade is inundated with
to create natural ventilation and light into
protruding planter boxes forming deep eaves that
the building. Both the front and back of
permit the clients to keep the windows open during
the house are open and wrapped with
the rainy seasons.
greenery, allowing cool wind to pass through.
2 2
2 3
2 4
2 5
Type: Educational Client: Private, FPT University Location: Ho Chi Minh City, Vietnam Date: 2016
FPT University 3d modeling for a 29,000 sqm University, that
Awards:
appears as an undulating forested mountain
-Vietnam Green Architecture Award of Vietnam
growing out of the city of concrete and brick.
Association of Architects, Gold/ FPT University
This form creates more greenery than is destroyed and provides the city with a new icon for sustainability.
26
-World Architecture Festival (WAF) / Winner for “Future Projects Education� category / FPT Technology Building
2 7
Type: Exhibition Client: Sherman Contemporary Art Foundation (SCAF) Location: Sydney, Australia Date: 2016
Green Ladder SCAF, Fugitive Structures The Sherman Contemporary Art Foundation
The pavilion features a grid-like construction
(SCAF) announced the fourth iteration of its
with a clear ceiling that creates shelter from the
annual pavilion series Fugitive Structures.
elements while allowing visitors to view the sky.
Our design consisted of a pavilion that centers
Overall the structure is highly porous, which
around the innovative use of bamboo, and
allows various entry points for adults and
office passion and self-imposed duty to green
children to walk or crawl through.
the world’s urban landscapes with plants and vegetation.
2 8
2 9
3 0
3 1
3 2
3 3
Type: Exhibition Client: Private Location: Ho Chi Minh City, Vietnam Date: 2016
Diamond Island Community Hall 3d modeling and construction planning for a
Awards:
project located on Diamond Island, an artificial
-IAA (International Architecture Awards) 2015/
islet in District 2, Ho Chi Minh City.
Diamond Island Community Hall
Surrounded by high-rise condominiums, 8 bamboo domes are scattered on the plot, offering places for local community. Its program includes conference, meeting, children activities, banquets and parties. Bamboo stalks are woven into 24m-diameterdome like traditional baskets to enclose fowls, showing a fusion of traditional folk art and contemporary architecture.
3 4
-Green Good Design, USA / Diamond Island Community Hall
3 5
3 6
3 7
3 8
3 9
Type: Bran Client: Studere Location: Porto, Portugal Date: 12.02.18
From the house to the city Final thesis (9/10) Under the tutelage of Maria Jose Aranguren, my final thesis is located in Paris. Specifically, in the water reservoir of the 16th arrondissement,
to the wall, the building grows and decreases according to the needs of the designer and the future of the company.
a giant walled enclosure that served to supply water by gravity to the whole neighborhood.
By
using
support
boyd
the
beams,
highest
load
calculated with
to
100%
In this large space, a residence plus workshop
occupancy, and taking the circulation to the
center for a fashion designer is proposed.
outside, the system is easy to assemble. I was proposed to Mention of Honor and
My idea was clear from the very beginning: this place is more than a work center. It can become a great social park, putting in value its location. Furthermore, it was a personal must that these magnificent walls should never be destroyed. Through a prefabricated system, anchored
4 0
highlighted by its sensitivity to the environment, constructive system and improvement of the social space for this Parisian neighborhood where it was located.
FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM MARZO 2017
AULA PFC ARANGUREN
TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN
GUILLERMO GARCÍA ARROYO 08168
4 1
FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM MARZO 2017
AULA PFC ARANGUREN
TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN
PA AC UL CE VA SO LÉ RY
GUILLERMO GARCÍA ARROYO 08168
Situación E_1:400
BARRIO DE PASSY
Haussmann le confía al ingeniero Belgrand la realización de un nuevo sistema de abastecimiento de agua de la capital, que acabará en la construcción de 600 kilómetros de acueducto entre 1865 y 1900. El primero, el de Dhuis, devuelve una agua captada cerca de Château-Thierry. Estos acueductos vierten su agua en depósitos situados dentro de la capital. Dentro de la capital y al lado del parque Montsouris, Belgrand erige el depósito de agua más grande. Una segunda red, consagrada al agua no potable, también saca el agua del Ourcq y del Sena para la limpieza de las calles y el riego de los espacios verdes. Reservoir de Passy es uno de estos depósitos y vertebrador del sistema de aguas del Distrito XVI (barrio de Passy).
RU ACCE E LAU SO RIS
TO
N
Las renovaciones de Haussman del centro de la ciudad arrastraron una subida de los alquileres que forzó a las familias pobres a trasladarse hacia los distritos periféricos. Algunas decisiones de ésta política urbanística contribuyeron a desequilibrar le composición de París entre el oeste, rico (Barrio de Passy), y el este de la ciudad, desfavorecido. Así ningún barrio del este parisino fue beneficiado con obras comparables a las largas avenidas en torno a la plaza de la Estrella en los distritos XVI (Passy) y XVII.
HAUSSMANN & PASSY
Haussmann fue más alla de crear equipamientos adecuados o disponer un trazado e calles adecuado. También interviene en el aspecto estético de los edificios de nueva planta.
Se sigue un diseño arquitecto homogéneo, unificando el edificio con su contexto. El reglamento de urbanismo de París favorece una tipología que acabará definiéndose como estilo haussmaniano, caractéristico de Paris: -Piso bajo y entresuelo con pared a profundos redans. -Segundo piso noble con uno o dos balcones. -Tercer y cuarto piso en el mismo estilo pero con marcos de ventana menos elaborados. -Quinto piso con balcón sin decoraciones. -Cubiertas a 45 grados.
ACCESO RUE COPERNIC
Las fachadas se organizas disponiendo una horizontalidad que se continúa entre fachadas de diferentes parcelas. Los balcones y cornisas no deben tener salientes muy marcados. Sobre estas fachadas, los progresos de las técnicas de aserradura y de transporte permiten utilizar la piedra de sillería en forma de bloques de gran tamaño. Haussmann buscaba que las calles producieran un efecto monumental sin recurrir a una sobrecarga de ornamentación, más de final de siglo.
FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM MARZO 2017
AULA PFC ARANGUREN
TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN
GUILLERMO GARCÍA ARROYO 08168
CATÁLOGO SECCIONES TRANSVERSALES_E1:175
7.20 2.70 7.20 2.70
1.80
1.80
7.20 2.70
2.70
1.80
7.20 2.70
2.70
1.80
2.70
7.20 2.70
2.70
1.80
7.20 2.70
2.70
1.80
2.70
2.51 7.20 5.45 3.60
0.90
5.45
2.70 2.95
2.95
7.20 11.26 2.70
1.80
11.26 5.88
11.26
5.88
2.70 8.75
2.93
8.75
2.93
2.93
2.93
2.93
2.88
2.88
2.88
8.75
5.80 2.88
2.88
2.88
I+I+I Reuniones Marketing Administración
I+I Exposición Showroom + Administración
I Talleres Privados Hedi Slimane + Galería Superior
I+I+I Marketing Campañas Retail
7.20 2.70
1.80
2.70
1.80
7.20 2.70
2.70
1.80
2.88
I + III + I Administación Showroom Galería
II + I + I Galería Exposición Exposición
II + I +I Espectáculos Almacén Galería
7.20 2.70
2.88
7.20 2.70
2.70
1.80
II + I Exposición Galería
7.20 2.70
2.70
1.80
7.20 2.70
2.70
1.80
7.20 2.70
1.80
2.70 2.51
2.51
2.51
2.51
2.51
2.51
7.20 2.70
1.80
2.70
2.95
2.95
2.95
11.26 8.75 5.80
5.80
4 2
2.95
2.95
11.26
11.26
2.95
11.26
11.26
2.93
2.93
2.93
2.93
2.93
2.88
2.88
2.88
2.88
2.88
5.80 2.88
I + II Galería Showroom
2.95
11.26
2.93
II Showroom
I + I + II Galería Restauración Talleres
I+I+I+I Galería Salas de reuniones Galería
I+I+I+I Galería Oficina Retail
I+I+I+I Oficinas Showroom Taller Galería
I+I+I+I Oficinas Retail
I+I+I+I Promenade | Talleres Privados Hedi Slimane
2.70
FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM MARZO 2017
AULA PFC ARANGUREN
TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN
GUILLERMO GARCÍA ARROYO 08168
NSOR ASCE
C7´ C7
55 C7
50
C7´
C7
45 40
C7 C7 C7
30
C7
C7´
C7
C7´
CASA
C7´
C7´
C7 C7
C7´
C7´
C7´
C7´
C7´
C7
C7´
C7´
C7
C7
C7´
20
15
C7´
C7
E IA RUIC ER GAL PERN CO
15
C7
20
C7´
C7
C7
C7´
Almacén Talleres
Sala de reuniones I
25
C7
C7
C7´
C7´
C7´
Sala de reuniones II
C7´
C7
10
CASA
C7´
C7´
C7´
DE HE
DI
C7
C7
C7´
5
Espacios de taller École de la chambre syndicale de la couture parisienne para estudiantes de moda
DE HE
C7
DI
C7´
C7´
C7
C7´
C7
0
C7´
C7
35
C7
C7´
C7´
C7
C7´
C7´
C7´
C7
C7´
C7´
C7
C7´
C7
C7´
C7
C7´
C7´
ATEL IER CREA CIÓN
C7
C7´
C7
C7´
C7
C7
Admin istr Marke ación ting
C7´
Sala
C7´
de reu
C7
niones
C7´
C7
C7´
C7
Nueva Saint s campañ Lauren as t Paris
C7´
C7
C7´
C7
C7´
C7
60
C7´
C7
C7´
C7
C7´
65
C7´
C7
C7´
C7
ASCE
C7´
NSOR
C7´
C7
ASCE
C7´
NSOR
PLANTAS 1,2,3_E1:175
C7
C7
C7´
C7´
C7
C7
C7´
C7´
C7
C7
C7´
C7´
C7
C7´
C7
C7
C7´
10
C7
25
C7´
C7´
C7´
C7
C7
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´ C7
5
C7
C7´
C7´
C7´
C7
C7´
Administración Talleres
Taller I
´
Taller II
C7
30
Taller III
0
35 C7
Conexión Nuevos espacios Passy Galería superior - Promenade 40
C7
C7
C7
C7
C7
C7
C7
C7
C7
C7
GALERÍA RUE LARISTON
25
C7
C7
20
C7
15
C7
C7
10
C7
C7
5
C7
0
TALLERES ESTUDIANTES
30
35
40
50
45
60
55
65
70
80
75
FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM MARZO 2017
AULA PFC ARANGUREN
TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN
GUILLERMO GARCÍA ARROYO 08168
IÓN SIC PO EX RNIC SO PE CE AC RUE CO
65
C7´
C7
40
C7´
BOU
C7
TIQU
E
C7´
45
MÓD ULO ASE OS
C7´
C7
50
MÓD ULO ASE OS
C7´
C7
55
+0.0
0
+11.
C7´
20
C7
60
C7´
C7
ASC
ENS
OR
C7
C7´
C7´
ACC ESO OFIC RUE INAS PAU L VALÉ RY
PLANTA BAJA_E1:175
+11 0
35
0.0
.20
25
C7
PRIV ADO
20
20
C7´
C7
15
IÓN
SIC
C7´
PO
EX
C7
+0.0
0
+11.
ESO ACC
WOR
C7´
10
KSH OP
C7´
5
C7
30
C7´
C7
0 C7
MÓD ULO ASE OS
C7´
20
15
+11.05
+11.20
C7´
C7
10
25 C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
C7´
35
0
5
C7
30 TALLERES HEDI SLIMANE
ACCESO TALLERES ESTUDIANTES
+11.20
+0.00
40
ACCESO TALLERES RUE LAURISTON C7
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
4 3
FROM TO
Casa-Talle
AR RESERV ETS
AULA P
TUTOR: DAVID C ENRIQUE AZPIL
GUILLER
SECCIONE
2.32
4.00
0
Acceso Rue Copernic
4.00
5
4.00
4.00
4.00
15
10
4.00
20
4.00
25
4.00
4.00
35
4.00
40
4.00
4.00
4.00
50
45
4.00
4.00
Taller III
Taller II
4.00
4.00
70
4.00
75
4.00
85
80
Conexión Calle-Nuevo parque de Passy
Administración Talleres
Taller I
4.00
65
60
55
Espacios de taller École de la chambre syndicale de la couture parisienne para estudiantes de moda
Conexión Showroom Talleres
Exposiciones Showroom
4.00
30
Conexión Nuevos espacios Passy Galería superior - Promenade
Sala de reuniones II Sala de reuniones I
Taller p Hedi S
Instalaciones
ACCESO RUE LAURISTON 0
4 4
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
THE HOUSE THE CITY
er para Hedi Slimane
RCH-COUTURE VOIR DE PASSY, PARIS SAM MARZO 2017
PFC ARANGUREN
D CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: LICUETA & ALBERTO BALLARÍN
RMO GARCÍA ARROYO 08168
ES DESPLEGADAS E_1:300
4.00
4.00
4.00
90
4.00
95
4.00
4.00
105
100
4.00
4.00
110
4.00
4.00
120
115
4.00
125
4.00
4.00
130
4.00
135
4.00
140
4.00
4.00
145
4.00
150
4.00
155
4.00
160
165
170
Oficina Saint Laurent Paris
Conexión Oficinas -Taller Hedi Slimane
Conexión y galería Oficina Residencia
Residencia Hedi Slimane
Sala de reuniones
Administración Marketing
Nuevas campañas Saint Laurent Paris
Acceso Paul Valéry
Retail
privados Slimane
105
Instalaciones
110
115
120
125
130
135
140
145
Instalaciones
150
155
160
165
170
175
180
185
190
4 5
FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM FEBRERO 2017
AULA PFC ARANGUREN
TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN
GUILLERMO GARCÍA ARROYO 08168
CONFIGURACIÓN - E.1:200 RESPETO + RECONVERSIÓN Los depósitos de Passy no son solo un lugar al que ir, sino que son un servicio a la ciudad de Paris que hay que maximizar. Pero no sólo a nivel de barrio, sino entendiendo el proyecto como un ente capaz de realizar un impacto en toda la ciudad. Para ello se concibe el Atelier Hedi Slimane como un ejemplo de reconversión, sostenibilidad y respetuosidad con el entorno. Análisis del ciclo de vida del proyecto: 0.0.0. Estado de Arranque: Llegada a Passy: Infinidad de posibilidades. La primera decisión es cerrar la manzana y no romper el muro: Principios innegociables del proyecto. 1.1.1. Primer contacto. Contacto con Passy: Construcciones a Nivel 1. Se disponen los espacios a nivel de Planta Baja y si el crecimiento de la empresa es mayor, se procedería a ampliar. 4.1.0. Primer Gran Crecimiento. Llegada a Passy: Infinidad de posibilidades. La primera decisión es cerrar la manzana y no romper el muro: Principios innegociables del proyecto. 4.4.1. Gran desarrollo semiprivado. Oficinas y Taller desarrollados: La empresa amplia su plantilla y los frentes a calles Paul Valéry y Lariston se encuentran ampliamente desarrollados. Se dejan las cubiertas de planta 1 como galerías accesibles para el público. 4.4.4. Passy Conquistado. Los tres frentes han crecido en altura. Los espacios de charnela entre calles se encuentran abiertos, diferenciando cada lateral como sus usos interiores. El frente de Paul Valéry es privado (oficinas), el de Rue Lariston semiprivado (Talleres para Hedi Slimane y talleres de estudiantes), y el de Copernic es público (Exposiciones). 1.1.4. Predominancia Espacios Públicos. Si Hedi Slimane pusiera fin a su estancia en Passy, el nuevo status de espacio público adquirido no se vería influido. El sistema independiente en estructura y programa permite que los accesos estén diferenciados y una parte no afecte a otra si alguna no funcionara. 1.1.1. Vuelta a Primer contacto. Contacto con Passy: Construcciones a Nivel 1. Se disponen los espacios a nivel de Planta Baja si el crecimiento de la empresa es menor, se puede adoptar un estado inicial de nuevo. 0.0.0. Vuelta a Estado de Arranque. Desintegración de Proyecto Passy. De manera respetuosa con Reservoir de Passy no se deja huella. El principio de no romper el muro se mantiene: Principio innegociable del proyecto.
ACCESO GALERÍA DE EXPOSICIONES
1.1.4.
GALERÍA EXPOSICIÓN
ACCESO GALERÍA SUPERIOR
4.4.4.
TALLERES RUE LAURISTON
4.4.1.
ACCESO TALLERES ESTUDIANTES RUE LARISTON
ACCESO TALLERES ESTUDIANTES
4.1.1.
1.1.1.
0.0.0.
4 6
ACCESO GALERÍA SUPERIOR
OFICINAS - BOUTIQUE HEDI SLIMANE
NUEVO PARQUE PÚBLICO YVES SAINT LAURENT
ACCESO OFICINAS PAUL VALÉRY
RESIDENCIA HEDI SLIMANE
TALLERES HEDI SLIMANE
Visitez le nouveau Passy
4 7
FROM TH TO TH
Casa-Taller pa
ARCHRESERVOIR ETSAM FE
AULA PFC
TUTOR: DAVID CAS CONST ENRIQUE AZPILICUE
GUILLERMO 0
VISTA DESD PAUL
CONTROL ACCESOS
CONTROL ENVÍOS / LLEGADAS MATERIAL
DIRECCIÓN
PASARELAS ACCESO A OFICINAS
ACCESO PAUL VALÉRY
4 8
RETAIL HEDI SLIMANE YVES SAINT LAURENT
NUEVAS CAMPAÑAS YVES SAINT LAURENT
ADMINISTRACIÓN MARKETING
GALERIA PRIVADA DE OFICINAS
CASA HEDI SLIMANE
HE HOUSE HE CITY
ara Hedi Slimane
-COUTURE DE PASSY, PARIS EBRERO 2017
C ARANGUREN
SINO & MARÍA GONZÁLEZ TRUCCIÓN: ETA & ALBERTO BALLARÍN
GARCÍA ARROYO 08168
DE ESTANQUE VALÉRY
TALLERES ESTUDIANTES
DESPACHOS / SALAS REUNIÓN
SALA REUNIONES 2
ADMINISTRACIÓN TALLERES ESCUELA
TALLER OFICINAS YVES SLIMANE
ACCESO RUE COPERNIC
EXPOSICIONES SHOWROOM
4 9
Part
Software licensed to Arup Job Title
Ref
Client
File
By
Date21-Oc
Structure1 Guillermo PFC
FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM FEBRERO 2017
AULA PFC ARANGUREN
TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN
GUILLERMO GARCÍA ARROYO 08168
7.031 kN-m
ESTRUCTURA II
Caso de carga crítico (16)
4.620 kN-m
Perfiles Cálculos Caso de carga representado
19.261 kN-m -0.148 kN-m
7.031 kN-m
17.831 kN-m
5.169 kN-m -0.147 kN-m
4.636 kN-m
27.990 kN-m
19.245 kN-m
-6.322 kN-m
-0.121 kN-m
7.031 kN-m
27.990 kN-m
19.252 kN-m
27.990 kN-m
19.252 kN-m
27.990 kN-m
19.252 kN-m
4.636 kN-m
17.831 kN-m
27.990 kN-m
19.245 kN-m
-0.299 kN-m -0.122 kN-m
51.606 kN-m
-0.297 kN-m -0.139 kN-m
51.604 kN-m
-0.998 kN-m
27.990 kN-m
51.576 kN-m
-1.002 kN-m
27.990 kN-m
-0.998 kN-m
27.990 kN-m
27.990 kN-m
38.790 kN-m -0.097 kN-m
231.681 kN-m 161.925 kN-m
27.990 kN-m 38.790 kN-m
-0.212 kN-m -27.809 kN-m 38.790 kN-m
147.020 kN-m
52.912 kN-m
10.227 kN-m 0.162 kN-m
-0.348 kN-m
52.354 kN-m
27.990 kN-m
-0.109 kN-m -11.233 kN-m 107.293 kN-m 129.088 kN-m 58.084 kN-m
38.790 kN-m 10.105 kN-m
38.790 kN-m
94.404 kN-m
27.990 kN-m
-0.126 kN-m
-0.113 kN-m -27.991 kN-m
147.880 kN-m
52.572 kN-m
25.783 kN-m -0.212 kN-m
52.486 kN-m
X
52.512 kN-m
38.790 kN-m
233.065 kN-m 162.486 kN-m
27.990 kN-m
-0.020 kN-m
37.346 kN-m
38.790 kN-m -0.126 kN-m
-0.125 kN-m -27.974 kN-m
147.890 kN-m
25.899 kN-m -0.311 kN-m 36.725 kN-m
-0.164 kN-m
36.956 kN-m
27.990 kN-m
-0.125 kN-m -27.975 kN-m
147.900 kN-m
52.505 kN-m
232.992 kN-m 162.367 kN-m
27.990 kN-m
38.790 kN-m
Y
38.790 kN-m
233.007 kN-m 162.367 kN-m
27.990 kN-m 38.790 kN-m 25.886 kN-m -0.109 kN-m
-0.198 kN-m 3.530 kN-m
-0.726 kN-m
-0.113 kN-m -27.974 kN-m
147.890 kN-m -0.097 kN-m
36.827 kN-m
-0.117 kN-m 3.512 kN-m
36.790 kN-m
38.790 kN-m
27.990 kN-m
-0.348 kN-m
52.512 kN-m
25.887 kN-m -0.124 kN-m
38.790 kN-m
-0.979 kN-m
-0.098 kN-m
38.790 kN-m
232.992 kN-m 162.367 kN-m
27.990 kN-m 38.790 kN-m
51.615 kN-m
52.912 kN-m
-0.212 kN-m -27.991 kN-m
147.880 kN-m
52.572 kN-m
25.886 kN-m -0.124 kN-m 36.829 kN-m
-0.123 kN-m 3.511 kN-m
38.790 kN-m
-3.976 kN-m
0.050 kN-m
38.790 kN-m
233.065 kN-m 162.486 kN-m
27.990 kN-m 38.790 kN-m
-4.033 kN-m -0.129 kN-m
22.262 kN-m
-4.036 kN-m -0.099 kN-m
38.790 kN-m
94.404 kN-m
-0.109 kN-m -27.809 kN-m
147.020 kN-m
25.899 kN-m -0.109 kN-m 36.827 kN-m
-0.123 kN-m 3.512 kN-m
38.790 kN-m
-0.120 kN-m -0.561 kN-m
22.197 kN-m
-0.074 kN-m -11.233 kN-m 107.293 kN-m 129.088 kN-m 58.084 kN-m
231.681 kN-m 161.925 kN-m
27.990 kN-m 38.790 kN-m
-4.033 kN-m -0.121 kN-m
22.231 kN-m
-0.123 kN-m -0.563 kN-m
-0.301 kN-m
36.790 kN-m
-0.117 kN-m 3.511 kN-m
38.790 kN-m
38.790 kN-m
27.990 kN-m
-0.979 kN-m
27.990 kN-m
93.357 kN-m
27.990 kN-m 38.790 kN-m 25.783 kN-m -0.311 kN-m
-4.033 kN-m -0.121 kN-m
22.229 kN-m
-0.121 kN-m -0.564 kN-m
46.976 kN-m
10.227 kN-m -0.212 kN-m 36.725 kN-m
-0.198 kN-m 3.512 kN-m
38.790 kN-m
-0.299 kN-m -0.122 kN-m
27.990 kN-m
27.990 kN-m
-0.726 kN-m
27.990 kN-m
-11.049 kN-m 106.905 kN-m 127.585 kN-m 58.613 kN-m
38.790 kN-m
51.604 kN-m
38.790 kN-m
27.990 kN-m
-0.164 kN-m 3.530 kN-m
-4.036 kN-m -0.129 kN-m
22.231 kN-m
-0.121 kN-m -0.564 kN-m
46.933 kN-m
-0.135 kN-m -6.322 kN-m
25.525 kN-m
27.990 kN-m 38.790 kN-m
46.951 kN-m
27.990 kN-m
10.105 kN-m 0.162 kN-m
52.486 kN-m
-0.123 kN-m -0.564 kN-m
38.790 kN-m
25.565 kN-m
17.831 kN-m
5.169 kN-m
27.990 kN-m
51.576 kN-m
27.990 kN-m
-0.122 kN-m -6.317 kN-m
38.790 kN-m 36.956 kN-m
-3.976 kN-m -0.099 kN-m
22.262 kN-m
38.790 kN-m
25.548 kN-m
17.831 kN-m
5.174 kN-m
-0.020 kN-m
38.790 kN-m
46.952 kN-m
-0.122 kN-m
-0.147 kN-m 27.990 kN-m
19.261 kN-m
52.354 kN-m
27.990 kN-m
-0.120 kN-m -0.563 kN-m
38.790 kN-m -0.299 kN-m -0.122 kN-m
-6.319 kN-m
-0.148 kN-m
4.620 kN-m
27.990 kN-m
-0.122 kN-m
25.546 kN-m
-0.123 kN-m
37.346 kN-m
22.197 kN-m 51.615 kN-m
-6.319 kN-m
-0.121 kN-m
5.172 kN-m
7.031 kN-m
-0.297 kN-m -0.122 kN-m
46.951 kN-m
-0.123 kN-m
27.990 kN-m
-0.561 kN-m
38.790 kN-m
25.548 kN-m
17.831 kN-m
5.171 kN-m
7.031 kN-m
27.990 kN-m
-6.319 kN-m
4.630 kN-m
38.790 kN-m -0.301 kN-m -0.139 kN-m
46.933 kN-m
-0.122 kN-m
-0.123 kN-m
7.031 kN-m
-0.135 kN-m -6.317 kN-m
25.565 kN-m
17.831 kN-m
5.172 kN-m -0.123 kN-m
4.629 kN-m
46.976 kN-m
-0.123 kN-m
4.630 kN-m
-0.123 kN-m
7.031 kN-m
25.525 kN-m
17.831 kN-m
5.174 kN-m
-0.098 kN-m
-0.074 kN-m -11.049 kN-m 106.905 kN-m 127.585 kN-m 58.613 kN-m
38.790 kN-m
93.357 kN-m
0.050 kN-m
38.790 kN-m
Load 16 : Bending Z Moment - kN-m
FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane
Job No
Software licensed to Arup
Software licensed to Arup
Job Title
Job Title
Rev
1
Job No
Part
Software licensed to Arup
Ref
Job Title
By Client
Sheet No
Client
File
Date21-Oct-16
Structure1 Guillermo PFC
Date/Time
Rev
1
Job No
Part
Software licensed to Arup
Ref
Chd
Job Title
By Client
05-Jan-2017 10:21
Sheet No
File
Date21-Oct-16
Structure1 Guillermo PFC
Date/Time
ARCH-COUTURE Job No Sheet No RESERVOIR DE PASSY, PARIS 1 ETSAM FEBRERO 2017
Rev
1
Part Job Title
By Client
File
Date21-Oct-16
Structure1 Guillermo PFC
Date/Time
Rev
Job No
Software licensed to Arup
TUTOR: DAVID CASINO & MARÍA GONZÁLEZ By Date CONSTRUCCIÓN: 21-Oct-16 File Structure1 Guillermo PFC Date/Time ENRIQUE AZPILICUETA & ALBERTO BALLARÍN
Chd Client
05-Jan-2017 10:21
Part
AULARefPFC ARANGUREN
Software licensed to Arup
Ref
Chd
05-Jan-2017 10:21
Sheet No
Sheet No
Rev
1
Job No
Part
Job Title
Ref
Client
File
Chd
Software licensed to Arup
By
05-Jan-2017 10:21
Date21-Oct-16
Structure1 Guillermo PFC
Date/Time
Sheet No
Rev
1
Job No
Part
Job Title
Ref
Client
File
Chd
Software licensed to Arup
By
05-Jan-2017 10:21
Date21-Oct-16
Structure1 Guillermo PFC
Date/Time
Sheet No
Rev
1
Job No
Part
Job Title
Ref
Client
File
Chd
Sheet No
1
Part Ref
By
05-Jan-2017 10:21
Date21-Oct-16
Structure1 Guillermo PFC
Date/Time
Chd
By File
05-Jan-2017 10:21
Date21-Oct-16
Structure1 Guillermo PFC
Date/Time
Chd
05-Jan-20
GUILLERMO GARCÍA ARROYO 08168
ESTRUCTURA I 16 CASOS DE CARGA
CÁLCULOS
Cargas Situaciones
10.391 kN-m
7.031 kN-m
21.110 kN-m
17.831 kN-m 0 kN-m
0.787 kN-m
-0.788 kN-m
-0.631 kN-m
14.094 kN-m
13.224 kN-m
-3.022 kN-m
4.761 kN-m
24.894 kN-m
23.943 kN-m
-0.252 kN-m
15.218 kN-m
14.094 kN-m
26.000 kN-m
-0.303 kN-m
24.894 kN-m
3.642 kN-m
14.666 kN-m
Y Z X
-16.206 kN-m
8.645 kN-m
Y Z X
5.324 kN-m
0.303 kN-m
0 kN-m
0 kN-m
0 kN-m
-1.945 kN-m
1.945 kN-m
9.603 kN-m
7.031 kN-m
0 kN-m
-0.649 kN-m
-0.649 kN-m
-5.324 kN-m
0.580 kN-m
5.324 kN-m
9.266 kN-m
0 kN-m
-0.580 kN-m
0 kN-m
-9.265 kN-m
0.414 kN-m
13.897 kN-m
Y Z X
-8.645 kN-m
0.275 kN-m
Y Z X
0.276 kN-m
-0.276 kN-m
14.094 kN-m
Y Z X
0.586 kN-m
24.894 kN-m
21.171 kN-m
14.094 kN-m
-0.275 kN-m
23.311 kN-m
Y Z X
41.609 kN-m
0.283 kN-m
38.790 kN-m
38.790 kN-m
0.017 kN-m
31.528 kN-m
27.990 kN-m
3.548 kN-m
42.310 kN-m
-3.621 kN-m
38.790 kN-m
34.306 kN-m 14.094 kN-m -6.903 kN-m
-19.070 kN-m
17.831 kN-m
17.301 kN-m
-5.668 kN-m
30.889 kN-m
0.051 kN-m
-2.432 kN-m
24.894 kN-m 4.806 kN-m
6.581 kN-m
5.823 kN-m
27.990 kN-m
38.790 kN-m
10.388 kN-m
2.737 kN-m
22.597 kN-m
7.031 kN-m
38.790 kN-m
47.139 kN-m
36.357 kN-m
27.990 kN-m
17.831 kN-m
-5.392 kN-m
10.151 kN-m
-0.287 kN-m
-3.242 kN-m
0 kN-m
-13.032 kN-m
20.322 kN-m
1.062 kN-m
44.681 kN-m
0.248 kN-m
-0.414 kN-m
13.028 kN-m
0 kN-m
7.369 kN-m
7.031 kN-m
24.894 kN-m
20.871 kN-m
0 kN-m
-9.265 kN-m
-0.415 kN-m
0 kN-m
-13.032 kN-m
17.831 kN-m
-0.907 kN-m
33.962 kN-m
-0.580 kN-m
9.266 kN-m
0 kN-m
0.415 kN-m
13.028 kN-m
0 kN-m
18.088 kN-m
5.547 kN-m
0 kN-m
27.990 kN-m 13.897 kN-m
-10.544 kN-m
2.864 kN-m
-5.324 kN-m
0.580 kN-m
1.189 kN-m
18.956 kN-m
-2.864 kN-m
0 kN-m
0.649 kN-m
27.990 kN-m
-4.829 kN-m
0 kN-m
-1.945 kN-m
0.649 kN-m
13.897 kN-m 0 kN-m
-0.379 kN-m
0 kN-m
-10.544 kN-m
1.945 kN-m
0 kN-m
-4.761 kN-m
21.139 kN-m 0 kN-m
0.379 kN-m
18.956 kN-m
13.897 kN-m
0 kN-m
-0.788 kN-m
-3.073 kN-m
0.034 kN-m
0 kN-m
-1.189 kN-m
24.894 kN-m
15.350 kN-m
-3.022 kN-m
0.276 kN-m
21.139 kN-m
13.897 kN-m
2.359 kN-m
14.094 kN-m
0 kN-m
-0.034 kN-m
-4.829 kN-m
-2.053 kN-m
Y Z X
0 kN-m
0 kN-m
20.738 kN-m -3.073 kN-m
0.552 kN-m
0 kN-m
-0.276 kN-m
20.738 kN-m
13.897 kN-m
220.337 kN-m
17.530 kN-m
Y Z X
3.927 kN-m
38.790 kN-m
27.990 kN-m 12.053 kN-m
-24.851 kN-m
23.762 kN-m
212.560 kN-m
26.175 kN-m
190.774 kN-m
-27.715 kN-m
182.997 kN-m 160.669 kN-m
127.706 kN-m
121.083 kN-m
98.143 kN-m
84.817 kN-m
75.852 kN-m
36.266 kN-m
Load 1 : Bending Z Moment - kN-m
24.894 kN-m
14.094 kN-m
92.631 kN-m
92.631 kN-m
0 kN-m
Job No
Software licensed to Arup
Software licensed to Arup Job Title
Ref
Client
File
By
Print Time/Date: 05/01/2017 11:16
12.335 kN-m
19.166 kN-m
1.436 kN-m
1.131 kN-m
23.055 kN-m
Sheet No
11.547 kN-m
7.031 kN-m
0.828 kN-m
7.658 kN-m
20.033 kN-m
4.898 kN-m
9.314 kN-m
-2.828 kN-m
24.894 kN-m
Y Z X
3.153 kN-m
35.625 kN-m
27.990 kN-m
27.990 kN-m
24.894 kN-m
11.905 kN-m
1.945 kN-m
28.378 kN-m
-9.391 kN-m
Job No
Software licensed to Arup
Date/Time
7.031 kN-m
1.166 kN-m
0.631 kN-m
8.526 kN-m
27.091 kN-m
30.437 kN-m
-3.657 kN-m
24.894 kN-m -8.227 kN-m
Y Z X
By File
9.565 kN-m
0.007 kN-m
-0.528 kN-m
0.862 kN-m
Y Z X
38.790 kN-m
19.655 kN-m
14.094 kN-m
14.094 kN-m
-2.018 kN-m
24.894 kN-m
17.834 kN-m
3.963 kN-m
6.125 kN-m
Y Z X
19.245 kN-m
7.031 kN-m
-15.931 kN-m
14.390 kN-m
-16.482 kN-m
23.586 kN-m
211.279 kN-m
-18.795 kN-m
23.035 kN-m
-6.317 kN-m
46.933 kN-m
107.195 kN-m
0.596 kN-m
40.794 kN-m
27.990 kN-m
3.134 kN-m
47.334 kN-m
-0.297 kN-m
-0.563 kN-m
51.576 kN-m
38.790 kN-m
33.044 kN-m
-3.207 kN-m
38.790 kN-m
14.094 kN-m -19.935 kN-m
103.710 kN-m
-19.346 kN-m
17.805 kN-m
199.825 kN-m
Y Z X
27.990 kN-m
4.342 kN-m
25.081 kN-m 10.729 kN-m
Y Z X
3.512 kN-m
Load 9 : Bending Z Moment - kN-m
14.094 kN-m
24.894 kN-m 8.402 kN-m
Load 10 : Bending Z Moment - kN-m
27.990 kN-m
24.894 kN-m
Load 11 : Bending Z Moment - kN-m
27.990 kN-m
-24.576 kN-m
17.254 kN-m
38.790 kN-m
36.790 kN-m
27.990 kN-m -0.979 kN-m
233.065 kN-m -25.127 kN-m
26.450 kN-m
203.502 kN-m
188.527 kN-m
-27.439 kN-m
25.899 kN-m
-27.991 kN-m
192.049 kN-m
147.880 kN-m 132.805 kN-m 110.871 kN-m
108.294 kN-m
93.218 kN-m
92.159 kN-m 69.855 kN-m
63.064 kN-m
24.894 kN-m
38.790 kN-m
22.262 kN-m
-4.036 kN-m
38.790 kN-m
27.990 kN-m
162.486 kN-m 140.434 kN-m
99.418 kN-m
77.632 kN-m 47.988 kN-m
38.790 kN-m
25.565 kN-m
170.263 kN-m 148.940 kN-m
148.211 kN-m 118.648 kN-m
64.124 kN-m
17.831 kN-m
4.636 kN-m
5.174 kN-m
27.990 kN-m
240.842 kN-m 14.941 kN-m
14.094 kN-m
52.572 kN-m 24.894 kN-m
7.342 kN-m
Load 12 : Bending Z Moment - kN-m
38.790 kN-m 14.094 kN-m
23.477 kN-m
Load 13 : Bending Z Moment - kN-m
38.790 kN-m 14.094 kN-m
Load 14 : Bending Z Moment - kN-m
27.990 kN-m
38.790 kN-m
Load 15 : Bending Z Moment - kN-m
27.990 kN-m
38.790 kN-m
-32.245 kN-m
Print Time/Date: 05/01/2017 11:17
Print Time/Date: 05/01/2017 11:17 STAAD.Pro V8i (SELECTseries 6) 20.07.11.70
5 0
Print Run 1 of 1 STAAD.Pro
Print Time/Date: 05/01/2017 11:17 V8i (SELECTseries 6) 20.07.11.70
Print Run 1 of 1 V8i (SELECTseries 6) 20.07.11.70 Print Time/Date: 05/01/2017 11:18 STAAD.Pro
Print Run 1 of 1 STAAD.Pro
Date/Time
1.123 kN-m
-2.847 kN-m
38.790 kN-m 21.273 kN-m
14.094 kN-m
1
Date21-Oct-16
Structure1 Guillermo PFC
Print Run 1 of 1 V8i (SELECTseries 6) 20.07.11.70 STAAD.Pro
38.790 kN-m
36.284 kN-m
Sheet No
Ref
-5.018 kN-m
36.213 kN-m
Job No
Chd
05-Jan-2017 10:21
4.827 kN-m
38.790 kN-m
37.874 kN-m
24.894 kN-m
2.323 kN-m
27.990 kN-m
Load 8 : Bending Z Moment - kN-m
Part
Date/Time
17.831 kN-m
15.356 kN-m
6.472 kN-m
27.990 kN-m
Rev
1
Date21-Oct-16
Structure1 Guillermo PFC
Print Time/Date: 05/01/2017 11:17 V8i (SELECTseries 6) 20.07.11.70
7.031 kN-m
38.790 kN-m
Ref
File
By
Print Run 1 of 1 STAAD.Pro
Sheet No
Part
Job Title
Client
Chd
05-Jan-2017 10:21
-6.041 kN-m
50.005 kN-m
Job No
Software licensed to Arup
Date/Time
17.831 kN-m
5.424 kN-m
0.413 kN-m
38.790 kN-m 14.094 kN-m
Rev
1
Date21-Oct-16
Structure1 Guillermo PFC
Print Time/Date: 05/01/2017 11:17 V8i (SELECTseries 6) 20.07.11.70
22.267 kN-m
17.831 kN-m
15.475 kN-m
Ref
File
By
Print Run 1 of 1 STAAD.Pro
Sheet No
Part
Job Title
Client
Chd
05-Jan-2017 10:21
-4.742 kN-m
39.357 kN-m
-0.866 kN-m
38.790 kN-m
27.990 kN-m
56.405 kN-m
27.990 kN-m
24.894 kN-m
5.952 kN-m
18.378 kN-m
1.712 kN-m
14.094 kN-m
Rev
1
Date21-Oct-16
Structure1 Guillermo PFC
Print Time/Date: 05/01/2017 11:17 V8i (SELECTseries 6) 20.07.11.70
45.623 kN-m
14.094 kN-m
Ref
File
By
7.031 kN-m
24.894 kN-m
Sheet No
Part
Job Title
Client
Chd
05-Jan-2017 10:21
Print Run 1 of 1 STAAD.Pro
17.831 kN-m
26.195 kN-m
-0.331 kN-m
Job No
Software licensed to Arup
Date/Time
Load 7 : Bending Z Moment - kN-m
14.094 kN-m
-20.511 kN-m
Rev
1
Date21-Oct-16
-1.556 kN-m
28.638 kN-m
27.990 kN-m
0.293 kN-m
Sheet No
Structure1 Guillermo PFC
Print Time/Date: 05/01/2017 11:17 V8i (SELECTseries 6) 20.07.11.70
7.031 kN-m
24.894 kN-m
Ref
80.436 kN-m
38.790 kN-m
Load 6 : Bending Z Moment - kN-m
24.894 kN-m
-4.380 kN-m
Part
File
By
-0.258 kN-m
39.286 kN-m 15.546 kN-m
Job No
Job Title
Client
Chd
05-Jan-2017 10:21
Print Run 1 of 1 STAAD.Pro
17.831 kN-m
16.144 kN-m
6.196 kN-m
27.990 kN-m
-27.864 kN-m
Software licensed to Arup
Date/Time
35.206 kN-m
27.990 kN-m
0 kN-m
-27.864 kN-m
Rev
1
Date21-Oct-16
Structure1 Guillermo PFC
Print Run 1 of 1 V8i (SELECTseries 6) 20.07.11.70 Print Time/Date: 05/01/2017 11:16 STAAD.Pro
24.894 kN-m
35.266 kN-m 14.094 kN-m
Y Z X
By
-0.832 kN-m
-2.468 kN-m
24.894 kN-m
Ref
File
Load 5 : Bending Z Moment - kN-m
27.858 kN-m
0 kN-m
Part
Job Title
Client
Chd
05-Jan-2017 10:21
7.900 kN-m
-0.028 kN-m
2.318 kN-m
Job No
Software licensed to Arup
Date/Time
-1.280 kN-m
29.267 kN-m
2.774 kN-m
16.670 kN-m
Rev
1
Date21-Oct-16
17.831 kN-m
8.446 kN-m
0.137 kN-m
24.894 kN-m
16.735 kN-m
-1.639 kN-m
14.094 kN-m
Sheet No
Structure1 Guillermo PFC
Print Time/Date: 05/01/2017 11:16 V8i (SELECTseries 6) 20.07.11.70
14.094 kN-m
0.327 kN-m
24.484 kN-m
14.094 kN-m
By
7.031 kN-m
24.894 kN-m
Ref
File
20.505 kN-m
0 kN-m -20.511 kN-m
Part
Job Title
Client
Chd
05-Jan-2017 10:21
Print Run 1 of 1 STAAD.Pro
17.831 kN-m
18.619 kN-m
Job No
Software licensed to Arup
Date/Time
0.018 kN-m
18.548 kN-m
14.094 kN-m
Rev
1
Date21-Oct-16
Print Time/Date: 05/01/2017 11:16 STAAD.Pro V8i (SELECTseries 6) 20.07.11.70
7.031 kN-m
Y Z X
Sheet No
Structure1 Guillermo PFC
Load 4 : Bending Z Moment - kN-m
20.505 kN-m
-40.646 kN-m
Part
Job Title
Client
27.858 kN-m 0 kN-m
-7.777 kN-m
-40.646 kN-m
120.023 kN-m 90.366 kN-m
Load 3 : Bending Z Moment - kN-m
13.897 kN-m
0 kN-m
-7.777 kN-m
119.929 kN-m
84.817 kN-m
Load 2 : Bending Z Moment - kN-m
13.897 kN-m
Print Time/Date: 05/01/2017 11:18 V8i (SELECTseries 6) 20.07.11.70
Print Run 1 of 1 STAAD.Pro
Print Time/Date: 05/01/2017 11:18 V8i (SELECTseries 6) 20.07.11.70
Print Run 1 of 1 STAAD.Pro
Print Time/Date: 05/01/2017 11:18 V8i (SELECTseries 6) 20.07.11.70
Print Run 1 of 1 STAAD.Pro
Print Time/Date: 05/01/2017 11:18 V8i (SELECTseries 6) 20.07.11.70
Print Run 1 of 1 V8i (SELECTseries 6) 20.07.11.70 STAAD.Pro
Load 16 : Bending Z Moment - kN-m
Chd
05-Jan-20
FROM THE HOUSE TO THE CITY Casa-Taller para Hedi Slimane GUILLERMO GARCÍA ARROYO 08168
FROM THE HOUSE TO THE CITY
Casa-Taller para Hedi Slimane
ARCH-COUTURE RESERVOIR DE PASSY, PARIS ETSAM FEBRERO 2017
AULA PFC ARANGUREN
TUTOR: DAVID CASINO & MARÍA GONZÁLEZ CONSTRUCCIÓN: ENRIQUE AZPILICUETA & ALBERTO BALLARÍN
GUILLERMO GARCÍA ARROYO 08168
CONSTRUCCIÓN II SECCION CONSTRUCTIVA E_1:50
4.00
4.00
4.00
4.00
4.00
DETALLE e1:10 1_Perfil de Aluminio EA-U260G 2_Poliuretano proyectado e: 4.5 cm en forjados e: 30mm en paneles verticales 3_Viguetas de sección n T: 146x70 mm, con placas 116x60x6 (((soldadas?))) cada 300mm en su cara inferior 4_Viga Aluminio de sección en doble T hueca 200x100 mm 5_... ¿placa? 6_Viga Aluminio de sección en doble T hueca 200x100 mm
4.00
4.00
4.00
4.00
DETALLE e1:10 1_Perfil de Aluminio EA-U260G 2_Poliuretano proyectado e: 4.5 cm en forjados e: 30mm en paneles verticales 3_Viguetas de sección n T: 146x70 mm, con placas 116x60x6 (((soldadas?))) cada 300mm en su cara inferior 4_Viga Aluminio de sección en doble T hueca 200x100 mm 5_... ¿placa? 6_Viga Aluminio de sección en doble T hueca 200x100 mm 7_Rastreles...¿? sujetan el falso techo... 8_Tirantes en forjado. Cables Acero 9_Lámina Neopreno entre perfil de Aluminio EA-U260G y pilar de aluminio 10_Pilar en cruz de aluminio extruido 112x112 mm e:7 mm con vaina de pilar 120x120 mm e:2 mm 11_Suelo ¿? 12_Rastreles... ¿? sujetan el falso techo 13_Plancha de aluminio e: 4 mm nervada con viguetas
DETALLE e1:10 1_Perfil de Aluminio EA-U260G 2_Poliuretano proyectado e: 4.5 cm en forjados e: 30mm en paneles verticales 3_Viguetas de sección n T: 146x70 mm, con placas 116x60x6 (((soldadas?))) cada 300mm en su cara inferior 4_Viga Aluminio de sección en doble T hueca 200x100 mm 5_... ¿placa? 6_Viga Aluminio de sección en doble T hueca 200x100 mm 7_Rastreles...¿? sujetan el falso techo... 8_Tirantes en forjado. Cables Acero 9_Lámina Neopreno entre perfil de Aluminio EA-U260G y pilar de aluminio 10_Pilar en cruz de aluminio extruido 112x112 mm e:7 mm con vaina de pilar 120x120 mm e:2 mm 11_Suelo ¿? 12_Rastreles... ¿? sujetan el falso techo 13_Plancha de aluminio e: 4 mm nervada con viguetas
DETALLE e1:10 1_Perfil de Aluminio EA-U260G 2_Poliuretano proyectado e: 4.5 cm en forjados e: 30mm en paneles verticales 3_Viguetas de sección n T: 146x70 mm, con placas 116x60x6 (((soldadas?))) cada 300mm en su cara inferior 4_Viga Aluminio de sección en doble T hueca 200x100 mm 5_... ¿placa? 6_Viga Aluminio de sección en doble T hueca 200x100 mm 7_Rastreles...¿? sujetan el falso techo... 8_Tirantes en forjado. Cables Acero 9_Lámina Neopreno entre perfil de Aluminio EA-U260G y pilar de aluminio 10_Pilar en cruz de aluminio extruido 112x112 mm e:7 mm con vaina de pilar 120x120 mm e:2 mm 11_Suelo ¿? 12_Rastreles... ¿? sujetan el falso techo 13_Plancha de aluminio e: 4 mm nervada con viguetas
5 1
Type: Culture Client: Competition Location: Cabo de Gata, Spain Date: 2015
Communitis Natura Pladur Nat. Competition I would want to create the most beautiful
A great translucent skeleton, with a clear glass
possible space that dignifies the pleasant
skin provides hostess facilities with distinctive
landscape of Cabo de Gata (spain) .
steal frame articulating the space.
The most luminous space, easier to understand
Direct lighting would enter and flow around our
and to use.
space, compact and flexible, understandable
I imagine it like a stone, carved with care, the
and easy , carved and beautiful.
sun would shine. The outside inside, where each visit would be celebrated. A great translucent skeleton, with a clear glass skin.
5 2
S
i w beau the gata easi imag care
wh cele skel gre cov facil dire flow flex carv
5 3
5 4
5 5
Type: Culture Client: Competition Location: Cabo de Gata, Spain Date: 2015
Int. Wildcare Centre Kruger National Park The program consists of an International
The dream consists of a community. A place
WIldcare Centre located in Kruger National Park
where tourist and scientists can help each
(South Africa).
others.
Integrated
with
the
local
materials
and
Meanwhile the platform provides the people a
developing a sustaibale design, the project
scenario to share, communicate and live.
flow like a big platform over the ground, where
A piazza of piazzas.
species will feel more natural when treated, but covered with the wooden structures.
5 6
an er ark
.a sts
als gn, rm will ut es.
the re,
5 7
Some other projects... Name: Cátedra Blanca National Student Comp. Type: Nature and Animal Conservation Client: Competition Location: Kruger National Park, South Africa Date: 2015
C Á T Erequires D R A BaLprofound A N C A thinking To design a nursery NATIONAL STUDENT COMPETITION
on educational programs and the constant change of child patrons through their lives.
to design a nursery requires a profound onto educational Having this on mind,thinking the idea is design a small programs and the constant change city, where children will grow facing different of child patrons through their lives.
situations meanwhile y arethe advancing having this onthemind, idea is to design a small city, where children courses…but how? will grow facing different situations Following the archictectural aesthetics, the me anwhile the y are advan cing spaces courses…but seem individual how? but communicate f olmove low intoglettdifferent h e a rc piazzas h i t e c t uappear, ral inside, and aesthetics, the spaces seem individual so the nursery is widely lighted and joyfully but communicate inside, and move to organized. let different piazzas appear, so the nursery is widely lighted and joyfully organized.
5 8
5 9
Name: Rebel Manifesto Type: Retail Client: School Location: Paris, France Date: 2014
6 0
61
Publications Name: Establecer el orden del espacio. "Stablishing the order in space". Best works during Alberto Campo Baeza`s 2013 Class. Type: Religious Location: Nisida Island, Naples, Italy. Date: 2013 + Alberto Campo's office website: https://www.campobaeza.com/
6 2
Name: 115 días Magazine. Shopping. Best projects under José González Gallegos` 2014 school year Type: Retail Location: Paris, France Date: 2014 + Gallegos office website: http://www.arangurengallegos.com/ag/portfolio_page/biography/
6 3
Recommendation Letters
6 4
6 5
Maja Belic, Senior Designer Consulting Planning Arup London
I´ve had the chance to work alongside Guillermo during the Lima2019 Pan American Games project where he has demonstrated the ability to be extremely diligent, organized, and consistent with the high quality of work he produces. His ability to communicate clearly and directly can be seen in his work and how he coordinates between our team and with various FAs. Guillermo is completely able to work independently and shows self-motivation to meet the requirements of the project. Guillermo observes and creates logical next steps whilst also knowing when to reach out for advice or consult specialists. I completely trust the work that Guillermo produces knowing it will be of a high standard with consideration to all aspects. I have often used Guillermo´s work as an example for the rest of the Overylay team due to its high quality and as he is usually far advanced than the rest of the team. In a fast pace project with limited resources this skill set is critical to the team and success of the project. Guillermo has an extremely friendly demeanor, easy to work with and has been able to connect and get along with everyone on the team bring fun and joy to an otherwise stressful project. To sum up, if I were to select a team for a future project Guillermo would be one of the first people I would want as part of the core group. The work he produces and his attitude to his work demonstrates that he deserves to be raised to the next grade in Arup. Guillermo is very good at focusing on this own work and hitting the objectives set for his packages far within the time required. He should use the additional time to advance other skill sets or develop other objectives he may have. Perhaps using his Project Management skills, he may be suited to assist in document control or team management. If the opportunity arises, I suggest Guilermo would be very well suited to relocate to London after the project should that be something he would wish to peruse. The diversity of the London office and access to the various Arup groups will give Guillermo a chance to use both his Architecture and Project Management degrees and develop them in an accelerated path.
Maja Belic
6 6
Alberto Campo Baeza Alberto Campo's office website: https://www.campobaeza.com/
6 7
Hidetoshi Sawa, Partner. Vo Trong Nghia Architects. Vo Trong Nghia Architectss` website: http://votrongnghia.com/
6 8
JosĂŠ Antonio Ramos, Vicens & Ramos Architecture Practice http://www.vicens-ramos.com/es/
6 9
Guillermo GarcĂa Arroyo // 2019