Context Objectives: • To carry sourcing services for glass ware and metal barware. • To find an alternative supplier to improve current products quality and long term relationship.
Geographical scope • China
Deliverables: Step 1 • RFI/RFQ Analysis Report • Recommended supplier list for audit • Recommended supplier list for sampling Step 2 (not started) • Supplier audit (if deemed necessary) • Sampling • Contracting
© 2022 Dragon Sourcing. All rights reserved.
Agenda
1. Context 2. Sourcing Strategy 3. Conclusion and Next step
© 2022 Dragon Sourcing. All rights reserved.
Following STEPS were covered for end to end sourcing Supplier Pre-Qualification •
Demand analysis to define and understand the product and key requirements
•
Prepare for audits (audit schedule, budget, and finalise audit questionnaire)
•
Supply analysis to identify list of potential suppliers
•
Conduct audits.
•
Recommend suppliers for sampling
Telephone pre-screening based on agreed simple criteria
•
Sample development & testing
•
Develop RFI/RFQ template
•
•
Conduct RFI/RFQ administration
•
Analyze RFI/RFQ responses and issue RFI-RFQ report
•
Recommend suppliers for next phase
Key activities
•
STEP 1 © 2022 Dragon Sourcing. All rights reserved.
Procurement Operations
Selection & Contracting
Negotiation, contracting and final selection
STEP 2
•
Manage P/O and agree payment terms and details.
•
Check in process production quality
•
Conduct pre-shipment QC
•
Arrange logistics
•
Manage payments
•
Manage supplier performance
•
Monitor new sourcing opportunities
STEP 3
Not started
Finished
In process
Delay
Milestone
The project to be carried out in 8 weeks for step 1. Week 1
Week 2
Week3
Week 4
Week 5
Week 6
Week 7
Nov.29 Dec.3
Dec.6 - Dec.13 - Dec.10 - Dec.27 Dec.10 Dec.17 Dec.24 Dec.31
Jan.3 Jan.7
Jan.10 - Jan.17 - Jan.24 - Jan.31 Jan.14 Jan.21 Jan.28 Feb.4
Step
Step 1
Week 8
Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Feb.7 Feb.11
Feb.14 - Feb.21 - Feb.28 - Feb.28 Feb.18 Feb.25 Mar.4 Mar.4
Step 2 (most of the factories will be closed 1 to 2 weeks before and after Chinese New Year)
1. Demand Analysis Supplier long list
2. Supply Market Analysis 3. Telephone pre-screening 4. Develop RFI/RFQ 5. Conduct RFI/RFQ administration 6. Analyse RFI/RFQ Responses
Supplier profiles with recommendations
CNY holiday
7. Prepare for Audits (if deemed necessary) 8. Conduct Audits jointly with CLINQ (if deemed necessary) Supplier for sampling
9. Analyse Audit Results (if deemed necessary) 10. Sample Development & Testing 11. Negotiation & Contracting
© 2022 Dragon Sourcing. All rights reserved.
Mar.7 Mar.11
Today
Step 1 : Supplier Pre-Qualification Supplier Pre-Qualification •
Demand analysis to define and understand the product and key requirements
•
Supply analysis to identify list of potential suppliers
Key activities
•
Telephone pre-screening based on agreed simple criteria
•
Develop RFI/RFQ template
•
Conduct RFI/RFQ administration
•
Analyze RFI/RFQ responses and issue RFI-RFQ report
•
Recommend suppliers for next phase
STEP 1 © 2022 Dragon Sourcing. All rights reserved.
Procurement Operations
Selection & Contracting •
Prepare for audits (audit schedule, budget, and finalise audit questionnaire)
•
Conduct audits.
•
Recommend suppliers for sampling
• •
•
Manage P/O and agree payment terms and details.
•
Check in process production quality
•
Conduct pre-shipment QC
•
Arrange logistics
•
Manage payments
•
Manage supplier performance
•
Monitor new sourcing opportunities
Sample development & testing Negotiation, contracting and final selection
STEP 2
STEP 3
Demand Analysis Category
Item name
Picture
2020 Volume
2021 Volume (units)
Price (including box and agent commission)
Currency Country
0 - New product in 3,000 pcs 2021 - only (1,500 sets) just landed
AUD
Coupe Glass Glassware boxed pair
0 - New product in 2,000 pcs 2021 - only (1,000 sets) just landed
AUD
China
Shot glass boxed set of 4
0 - New product in 6,000 pcs 2021 - only (1,500 sets) just landed
AUD
China
Copper plated hammered tumber boxed pair
Only started importing 6,000 pcs from China (3,000 sets) mid -2020
AUD
China
Copper plated Metal champagne barware flute - boxed pair
Only started importing 10,000 pcs from China (5,000 sets) mid -2020
AUD
China
Copper plated mug - boxed pair
Only started importing 6,000 pcs from China (3,000 sets) mid -2020
AUD
China
Martini Glass boxed pair
© 2022 Dragon Sourcing. All rights reserved.
Current supplier notes
China
Does not appear to be good quality glassware factory chips and bubbles on glassware, poor quality plating, significantly varying product sizes
Large manufacturer. Not great on quality or interested in building good relationship need close management and careful QC.
Dragon Sourcing has developed an online sourcing tool (GSP) to manage sourcing projects end to end. The GSP provides: •
A central database of hundreds of thousands of suppliers •
•
Management of sourcing projects from start to finish.
Tools to facilitate supplier research, pre-screening, RFI-RFQ administration & qualifying supplier through ranking process and generating supplier profiles. Complete unique online platform suitable for Global Strategic Sourcing process. http://gsp.dragonsourcing.com
© 2022 Dragon Sourcing. All rights reserved.
As a first step, extensive supplier data base was built leveraging multiple sources of information & from existing DS database.
ing d l i Bu
© 2022 Dragon Sourcing. All rights reserved.
rd e i l p su p
se a b ata
SP G in
Pre-screening process was initiated after receiving client validation, This process was to filter the long list of identified suppliers prior to moving them to the RFI-RFQ step
s“ r e i pl Sup
© 2022 Dragon Sourcing. All rights reserved.
Mu
ri a ri te c ve” a h st
to
s pas
p
. ing n e c re s e r
Post pre-screening the suppliers, RFI-RFQ process was administered to filter out most capable suppliers.
dard n a t s RFI-
© 2022 Dragon Sourcing. All rights reserved.
tion a m infor s s ne busi
i on t c u od & pr
l ntro o C ality u Q &
Suppliers Identification results Total 95 suppliers identified, 62 suppliers passed telephone, 34 supplier replied RFI-RFQ 100
95
95
43
43
80
62
62
30
30
60
No of suppliers
40
34 52
52
16
20 32
32 18
0
0
li pp u S
er
ed tifi n e Id
Te
ne ho p le
epr
e re sc
ng ni
m Co
pl
© 2022 Dragon Sourcing. All rights reserved.
ed et
Pa
ss
ed
Te
le
e on ph
s epr
e cr
g in en S
tR en
FI
Q RF ly On
R
FQ
re
0 d vi e ce
R
-R FI
FQ
th bo
ce re
d ive
li pp Su
om ec r s er
m
d en
to
a
it/ ud
sa
m
0 g il n p
Rejection reason for phone screening and RFI-RFQ administration Metalware #
Rejection Reasons - Metalware
Don't produce required products, 1 although there are metal barware on the website 2 Stopped producing 3 cannot produce all 3 types 4 Outsourced Not interested, think their price is not 5 competitive 6 cannot do double side plating 7 Trader Total #
Rejection Reasons - Metalware
Can't meet the technical requirement / quality standard Say will reply but no reply finally, 2 every week call them 2-3 times Consider themselves not competent 3 for this project after checking the spec. don't answer phone or email after 4 phone pre-screening Total 1
© 2022 Dragon Sourcing. All rights reserved.
Glassware
No. of suppliers failed phone prescreening
%
5
38%
2 2 1
15% 15% 8%
1
8%
1 1 13
8% 8% 100%
No. of suppliers failed RF-RFQ
%
6
75%
5
33%
2
13%
2
13%
15
100%
#
Rejection Reasons – Glassware
Don't produce required products, 1 although there are glassware on the website 2 Traders/distributors or Importers only Not interested, think their price is not 3 competitive 4 Stopped producing Duplicate suppliers (different 5 company name but same boss) 6 Cannot export Total
No. of suppliers failed phone prescreening
%
9
45%
5
25%
2
10%
2
10%
1
5%
1 20
5% 100%
#
Rejection Reasons - Glassware
No. of suppliers failed RF-RFQ
%
1
Can't meet the technical requirement / quality standard
11
79%
2
Not interested to continue as capacity is full/Qty is too small/not competitive
3
21%
Total
14
100%
RFI Score Card for metal barware 16 Suppliers replied RFI-RFQ – the highest score is 97 points, and the lowest score is 59 points, the average score is 77 points (RFI score) 100
97 20
95 18
93 89
88
17 17
80
83 20
81
14 18
78
76
12 20
73 17
20
60
40
71
77
77
76
72
68
69
63
67 10
67 10
60 12
14
48
46
Supplier 14
Supplier 15
56
51
57
57
20
Supplier 1 Supplier 2 Supplier 3 Supplier 4 Supplier 5 Supplier 6 Supplier 7 Supplier 8 Supplier 9
© 2022 Dragon Sourcing. All rights reserved.
59 8
66 56
0
60
Supplier 10
Supplier 11
Supplier 12
Supplier 13
51
Supplier 16
Metal barware RFQ analysis 16 suppliers replied RFQ, 7 suppliers’ prices are 6%~35% lower than client’s current price
(FOB price)
1 USD= 1.38 AUD
RFQ analysis - metalware
(Tooling cost)
US$50
US$1,500
US$40
US$1,200
US$30
US$900
US$20
US$600
US$10
US$300
US$0
Supplier 9 Supplier 8 Supplier 13 Supplier 9 Supplier 8 Supplier 13
Supplier Supplier 4 Supplier 3 Supplier Supplier 1 Supplier 2 Supplier 12 11 15 Supplier Supplier 4 Supplier 3 Supplier Supplier 1 Supplier 2 Supplier 12 11 15 Total price for 3 items with 10% DS margin Total tooling cost for cup
© 2022 Dragon Sourcing. All rights reserved.
Supplier 16 Supplier 16
Client's current price Total sampling cost
Supplier 14 Supplier 14
Supplier Supplier 5 Supplier 6 Supplier 7 10 Supplier Supplier 5 Supplier 6 Supplier 7 10
RFI score
US$0
RFI Score Card for glassware 18 Suppliers replied RFI-RFQ – the highest score is 99 points and the lowest score is 41 points, the average score is 71 points
100
99 94 88
20 20 80
14
81
80
18
14
79 75 15
73
70
70
70
12 15
60
14
20
17
68 12
66 10
63 10
62 12 48
40
79
12 74
74 63
20
0
66
64
63
47 41 14 14
58
56
50
53
56
56
53
50 36
33
27
Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
© 2022 Dragon Sourcing. All rights reserved.
Glassware RFQ analysis - 18 suppliers replied RFQ, suppliers’ prices are 11%~129% higher than client’s current price
1 USD= 1.38 AUD US$80
US$1,300
US$60 US$800
US$40
US$300
© 2022 Dragon Sourcing. All rights reserved.
Supplier 6
Jiuyi Dahua RFI score
Supplier 16
Supplier 2
Supplier 18
Supplier 3
Supplier 4
Supplier 8
Supplier 10
Supplier 5
Supplier 10
Supplier 1
Supplier 15
Supplier 17
Supplier 9
Supplier 7
Shanxi Wonderf Crystal Meilian Yihua Anhua Jingshen Linkand Jinghuan Yingmao Beststee Ruixin Fly ul g with 10% DS margin g de Client's l current price Total price for 3 items Total Tooling cost for cup Total Sampling cost
Supplier 11
Yafu
Supplier 14
US$0
Supplier 13
US$20
Xinhua
Aliistar
Ron
US$200
Recommended for sampling
Recommended suppliers for sampling – metal barware No.
Supplier
Total price for 3 RFI items with 10% DS Savings Tooling score cost margin
Sample cost for Cup
Sample cost for Sampling lead Packaging time
Back up suppliers
Advantage
Disadvantage
1
Supplier 9
76
35%
Very good price/has exported to German retailer like cup:30 days Need tooling cost for cup+ gift box: Aldi 、 Lidl/100% export: 40% to Europe,50% to north champagne flute and America/good factory: 9500m2 with 136 staffs/own ISO cannot be refunded 30 days 9001/BSCI/sample cost can be refund
2
Supplier 8
78
22%
cup: 14days Very good price/has exported to retailer like Factory is small about cup+ gift box: Casa/Lidl/Amazon/98% export: 40% to export and 40% 1200m2/sample cost is 45 days to north America/own BSCI 50% refunded
3
Supplier 13
67
21%
cup:10days cup+ gift box: 15 days
4
Supplier 12
61
13%
cup: 10 days good price/has exported to retailer like zwilling/wmf/ cup+ gift box: Kobach/Lidl/60% export: 20% to export and 20% to 15 - 20 days north America/8000m2 factory size with 120 staffs
12%
Good price./DS’s current supplier/has exported to cup: 7-12days METRO, HABITAT, BBB, VISKI&TRUE, TARGET, cup+ gift box: COSTCO/95% export: 40% to export and 45% to north 12-18 days America/180 staffs/own BSCI/Sedex/no tooling cost and sample cost can be refunded
7%
Price is O.K./DS’s current supplier/has exported to cup: 15 days IKEA ,WESCO,COSTE ,TARGET,LIDL, ALDIAND/99% cup+ gift box: export: 54% to export and 40% to north America/total 25 days 550 staffs for 3 factories/own ISO 9001/BSCI/no tooling cost and sample cost can be refunded
6%
Price is O.K./has exported to cup: 7-10days GEFU/ALDI/MATO/LIDL/90% export: 50% to export and Packaging sample cost cup+ gift box: 10% to north America/big factory with 380 staffs, cannot be refunded 14 days 66Km2/own ISO 9001/ISO 14001/BSCI/no tooling cost/sample cost is low
5
7
8
Supplier 4
Supplier 3
Supplier 11
89
93
71
© 2022 Dragon Sourcing. All rights reserved.
Very good price, no tooling cost,99% export:60% Europe, 30%north America, has exported to Paragon sample cost is high and Customer Communications limited/gng /selbrae house cannot be refunded ltd The tooling cost and packaging sample cost are 50% refunded
Recommended for sampling
Recommended suppliers for sampling – glassware No.
Supplier
Total price for 3 RFI items with 10% score DS margin
Savings
1 Supplier 13
66
-11%
2 Supplier 14
63
-12%
3
75
-15%
4
Supplier 7
Supplier 9
5 Supplier 15
6
Supplier 1
70
62
99
Tooling cost
Sample cost Sample cost Sampling lead for for time Cup Packaging 20 days
Back up suppliers
Advantage
Disadvantage
Almost 20 years export experience/has exported to Small factory with 1000m2 UK retailer: The Printed Image/100% export: 20% and 42 staffs/price is higher to Europe, 50% to north America,20% to Australia/tooling and sample cost can be refunded than client’s current price
Has exported to with retailer such as Price is higher than client’s 10-15 days CHS(AHR ) ,TWO‘S,ESSENTIAL/big factory with 240 current price staffs, 60k m2/70% export: 30% to Europe/own BSCI/sampling cost can be refunded Has exported to retailer Price is higher than client’s BODUM,MASTRAD,TARGET/More than 10 years current price/sampling cost 15 working export experience/80% export: 25% to Europe,40% for packaging cannot be days to north America/tooling and sample cost for cup refunded/small company can be refunded with 50 staffs, 2000m2
-15%
Has exported to retailer Mikasa, Creat & Barrel,/17 Price is higher than client’s current price/Packaging 15-20 days years export experience/own ISO 9001/80% sample cost can not be export: 10% to Europe,35% to north America/ refunded
-22%
Has exported to UK retailer Matanlan/80% export: 30% to Europe,35% to north America/tooling and Price is higher than client’s sample cost can be refunded/middle size factory current with 3000m2, 200 staffs
-24%
© 2022 Dragon Sourcing. All rights reserved.
15 days
Has exported to Aldi, Target, TESCO, Walmart, GDC, ZARA HOME, Anthropolgie, Crate and Barrel/80%sales to Europe and America/own Price is higher than client’s 25-30 days ISO9001/BSCI/SEDEX /factory is big with 300 current staffs/tooling and sample cost are cheaper and can be refunded