Portfolio (EN)

Page 1

WI L S O N

Architecture and Urban Design School

JR

BA | 2021


WILSON LOPES DO N. JUNIOR issuu.com/wilson.junior @wilsonlpes

wilson.junior@fau.ufrj.br V.le Romagna 1, Milano, MI

“Architecture is the art of reconciliation between us and the world, and this mediation takes place through the senses” - Juhani Pallasmaa


CURRICULUM VITAE EDUCATION Federal University of Rio de Janeiro (UFRJ) Architecture and Urban Design | March 2016 - Currently Politecnico di Milano (PoliMi) Architecture and Urban Design | September 2021 - Currently EXPERIENCE TETO Brasil (NGO), Urban Infrastructure | June 2017 - December 2018 Community Square: Emergency housing:

Coordination; Execution; Topographic mapping. Coordination of logistics; Execution; Terrain mapping.

TETO Brasil (NGO), Community Management Coordination | January 2019 - September 2021 Community Garden: Water Distribution:

Technical consultancy; Coordination. Design and detailing; Coordination; Terrain mapping.

NEX- Architecture, Architectural Assistent | August 2021 - Currently Oxford’s Exeter College: The British Museum: Osnaburgh Place Pavilions: Crawley Public Realm: Residencial Projects:

3D Modeling, Graphics and Annotations. 3D Modeling, Waterproof System Detailing. Graphics and Presentation. 3D Modeling, Design Researching. 3D Modeling, Design, Graphics and Annotations.

FREELANCING Franki Arquitetura Rici Flores Interiores

Residencial Constructions Drawings, Lighting Design. Residencial Constructions Drawings.

EXTRACURRICULAR Competition: Maré-Cidade International Ideas Competition | 2021 Shortlisted Project

Exposition: Modernist production of social housing in Brazil | October 2019 Schorlarship Founded Research

Exposition: Integrated Workshop 2018.1 (UFRJ) | June 2018 Selected Project

SKILLS Drawing: Modeling: Design: Rendering:

Vectorworks, AutoCAD 2D Vectorworks, 3DS Max, Revit, SketchUp, Rhinoceros, AutoCAD 3D Adobe Suit, MS Office V-Ray Next

LANGUAGES Portuguese: Native English: Fluent French: Basic Italian: Basic

wilson.junior@fau.ufrj.br +39 351 7654414



ACADEMICS CULTURAL SPACE, BOM JESUS ISLAND, RJ

RETAIL CENTER GLÓRIA, RJ

STUDENT RESIDENCE FUNDÃO ISLAND, RJ

EDUCATIONAL COMPLEX GOVERNOR’S ISLAND, RJ

MIXED / COMMERCIAL USE BOTAFOGO, RJ

INTERIOR DESIGN I LEBLON, RJ

HOUSING ENCLAVE MANGUINHOS, RJ

CULTURAL SPACE, BELO HORIZONTE, MG

RESENSITIZING CITIES TIRADENTES SQUARE, RJ

CULTURAL SPACE BELO HORIZONTE, MG

KINDERGARTEN REHABILITATION LA ARBOLEDA DE FATIMA, BO

MARÉ-CIDADE MARÉ, RJ

RESIDENTIAL / MIXED USE

COMPETITIONS RE SCHOOL ÑANDE RU MARANGATU, MS

RESIDENTIAL / MIXED USE TIJUCA, RJ

WORKSHOPS PARANOÁ WATERFRONT BRASÍLIA, DF

NITERÓI, RJ

SELECTED PROJECTS


V

I

T H R O U G H SUBJECT: PROJETO ARQUITETÔNICO IV INSTRUCTOR: MAURO NOGUEIRA TIPE: MIXED/COMMERCIAL USE LOCATION: BOTAFOGO, RJ CO-AUTHORSHIP: D. ESMAEL E J. PINA.

D

T H E

E

V O I D



3|


INTRODUCTION | 4

A LANDMARK Cristo Redentor is a landmark in the landscape of Rio de Janeiro and one of the most attractive points of the city. It can be seen along Rua São Clemente, which aligns with the monument. The project seeks to privilege this milestone in two ways: 1. directing the user’s gaze to the monument in the collective areas, from the line that connects Christ to the terrain; 2. retreating the implantation, creating a void that moves away from the visual barriers of the immediate corners.


5 | CONCEPTION DIAGRAM

individual

team

procedural

matrix

meeting

decompression

services

DIFFERENT WORK RELATIONS AND THEIR AMOUNTS OF SPACE REQUIRED


MANIFEST | 6

THE WORK RELATIONS The contemporary world doesn’t just expect functional workspaces. It demands, more and more, flexibility in the environments, as well as new possibilities of hierarchical organization of work teams. Understanding the varieties of the new market demands, such as the emergence of numerous start-ups and new technologies, we propose non-homogenized spaces that can be reorganized and adapted to the requirements of the most

The contemporary world doesn’t just expect functional workspaces. It demands, more and more

varied forms of production. Starting with the scale of the environments, the project is organized in such a way as to place face to face, on the same level, individual offices with corporate slabs and medium-sized offices, some of them arranged on double floors. This contact is enhanced by the central voids that allow visual contact with the other offices, giving a new dynamic to the spaces. In addition, the collective canopies provide an occasional meeting and a mix of audiences from different work environments during break and rest hours.


7 | TRANSVERSAL SECTION


EXPLODED DIAGRAM | 8

THE STRUCTURING VOID The central atriums are built in such a way as to guarantee the capture of natural ventilation and its distribution throughout the building. They facilitate city views and visual contact between the floors, in addition to promoting the organization of the program.

Restaurant

Large offices

Medium offices

Decompression

Small offices Meeting rooms Auditorium Coworking Stores


9 | ACTIVATION

A COMMERCIAL HUB The Botafogo neighborhood is full of services, shops and street vendors, generating a large flow of pedestrians on its sidewalks. The implantation of the building recognizes and donates space for the development of this flow.

The gallery on its first two floors, of a public nature, uses this potential to activate the project, including it in the Gastronomic Pole of Botafogo and making it a powerful commercially attractive space.


LONGITUDINAL SECTION| 10


PROSCENIUM BETWEEN LIMITS AND APPROPRIATIONS WORKSHOP: ALTERNATIVE ACADEMIC PROJECT 2019 INSTRUCTORS: ALBERTO COLLET E CARLOS MAIA TIPE: PUBLIC/CULTURAL SPACE LOCATION: BELO HORIZONTE, MG



13 | MANIFEST

HOW CAN A SPACE DILUTE LIMITS AND ALLOW SPONTANEOUS CONSUMPTION? 1. The space should allow the occupation of different social groups. 2. Provide dialogues between different contexts. 3. Stimulate the consumption of culture

From the analysis of the surroundings, a main question arises. Their responses result in direct design actions, taking the project beyond a functional positioning. The

land in question is located in a border area, culturally marked by its contrasts and possibilities for expansion.

TERRAIN

RUI BARBOSA SQUARE

LIMITS

DENSER ZONE

NOT SO DENSE ZONE

APPROPRIATION ZONE


CONCEPTION | 14

CONNECTIONS ARE THE STARTING POINT FOR THE CONCEPTION OF SPACE


15 | OUTSIDE STAGE

THE OUTSIDE STAGE Architecture is developed here as a potentializing factor. The building is designed through the gesture of expansion, opening up to allow its appropriation, a necessary movement in a place marked by cultural manifestations. At the same time, it works as a thinner of the limits between the ridiculousness of cultural spaces and as spontaneous cultural production. Its ground floor makes the sidewalk bleachers, as well as its facades become screens for the city.


OUTSIDE STAGE | 16

EXTERNAL VIEW OF THE FACADE ON EXHIBITION


17 | INSIDE STAGE

THE INSIDE STAGE An internal atrium makes the exhibition halls visible to pedestrians, generating, at the same time, an appreciation space for occupations on the ground floor. The rooms are thought of as flexible spaces in order to adapt to the installations of the various local artists. Among them, there is also a public circulation for access to the terrace, bringing the space of the street into itself.


INSIDE STAGE | 18

INTERNAL VIEW OF THE EXHIBITION ROOM


TOWARDS A COMMON GROUND A S T R AT E G Y F O R B LU R R I N G B O R D E R S COMPETITION: MARÉ-CIDADE - UIA 2021 INSTRUCTORS: JULIANA SICURO E MARINA CORREIA TIPE: INFRASTRUTURE LOCATION: MARÉ, RJ CO-AUTHORSHIP: B. KRAEMER, G. CASAL, J. PINA E L. SILVA



21 | MANIFEST

“The project is guided by strategies that aim to blur the condition of the border, reconciling its contrasts and creating continuities for the pedestrian”

Throughout its history, the territory of Maré has been affected by major urban infrastructure projects that were responsible for the production of material and immaterial barriers. These barriers caused the disintegration of the set of favelas with the surrounding neighborhoods and the strangulation of their urban fabric. Next, two border conditions are identified in the region: Avenida Brasil - delimits the Maré complex in relation to the surrounding neighborhoods - and an internal boundary that is established at the meeting between two types of fabric - one industrial and not very dense and the other dense and residential. The immediate surroundings of Av. O Brasil is occupied by industrial blocks, with the presence of large warehouses. This put pressure on the first communities in Maré to build their houses, on stilts, towards Guanabara Bay, separating them from their main access, which is Av. Brasil. These two boundary conditions exemplify urban planning that is not oriented towards the resident population and reinforce the marginal condition to which the territory is subject. The most damaging consequences of this occupation process were the sectorization of land uses, the absence of free public areas within the complex, due to the strangulation of the fabric, the difficulty of access to the main means of transport and the loss of contact with water. . Taking this into account, the project is guided by strategies that aim to blur the condition of the border, reconciling its contrasts and creating continuities for the pedestrian. These strategies are: the construction of crossing equipment at specific points on Avenida Brasil; the re-appropriation of subdivisions and underutilized warehouses for public and residential equipment and the opening of new open spaces where the cultural activities that currently occupy the streets and blocks of the complex can converge.


STRATEGY | 22

Isolation

Reconnetion

Strangulation

Appropriation

Oppression

Public Space


Public Market

23 | MASTERPLAN


EXTERNAL EDGE: AV. BRASIL | 24 The edge of Avenida Brasil receives three programmatic walkways - cultural, nutritional (public restaurant) and educational (public library) - accessed through large, green and safe public spaces. The Library walkway also articulates two BRT stations: the TransBrasil line, already in place, and the TransCarioca line, proposed by the project. In addition, two underground crossings are created that allow a quick return through the territory

Traffic calming Proposed BRT Transcarioca

Proposed BRT Transcarioca Auditorium

Existing BRT Transbrasil

Water channel Library

of Maré and Bonsucesso, connecting the two neighborhoods. For urban solutions, sidewalks are reordered and bus stops are created for safer access to the bus transport system. Public spaces are also proposed at each access to the walkways, generating continuity towards the internal fabric of the Maré complex.

Public Space Viewpoint

Shared street Public Space


25 | INTERNAL EDGE: PUBLIC MARKET

The internal frontier of contrasting urban fabric and land use expands with the reappropriation and demolition of underutilized industrial warehouses to create a permeable green area to establish a new centrality for cultural and social activities, which currently occupy the streets and blocks of the complex , can converge. The proposed uses are designed to create a cyclical

movement of production, consumption, waste management and recycling, in order to generate more job possibilities. The new open area receives a community garden, a public market and a recycling cooperative. In addition to the collective use proposed for the park, the presence of several warehouses mapped in the territory allows a glimpse of new typologies for the housing issue, also due

Shared Street

MANAGEMENT AND OPERATION DIAGRAM

Shed adapted for housing

Recycling cooperative


INTERNAL EDGE: PUBLIC MARKET | 26

to the reappropriation of these buildings. In addition, the current urban fabric is maintained and the changes are focused to allow the shared use of street space, normally appropriate by residents. For that, it is proposed to level the street, giving priority to the bicycle and the motorcycle. Due to its varied dimensions, many streets cannot be accessed by regular public

Observatory

Public market

services, such as garbage collection and mail. As a way to reconcile this barrier, we propose the fragmentation of these services with a motorcycle cart that allows them to penetrate the narrowest streets so that the garbage and the post office can work.

Informal expansion

LONGITUDINAL SECTION TO THE PUBLIC MARKET

TYPOLOGIES OF SHED ADAPTATION FOR HOUSING


HOUSING AND PANDEMIC A

M A N I F E S T

G U I D E

COMPETITION: IR E VIR INSCRUCTORS: ALINE CRUZ, MARINA CORREIA, JOÃO FOLLY E JORGE FLEURY E WEBER CHIMITI TIPE: HOUSING/MIXED USE LOCATION: NITERÓI, RJ CO-AUTHORSHIP: A. COSTA, A. GONÇALVES E Y. ESMERALDO.



29 | STRATEGY

STEP 1: EXPROPRIATE

STEP 2: COORDINATE

STEP 3: OCCUPY

THE 3 STEPS TO A HEALTHY CITY


STEP 1: EXPROPRIATE | 30


31 | STEP 2: COORDINATE


STEP 3: OCCUPY | 32


COMMERCIAL BISTRO SHOPPING LEBLON SUBJECT: PROJETO DE INTERIORES I INSTRUCTOR: SILVIO COLIN TIPE: COMMERCIAL LOCATION: SHOPPING LEBLON, RJ



The project bets on casuality based on the concept of an open kitchen. Opting for a l i tt l e e x p r e s s i v e m a t e r i a l i t y , the agents acting here are the users themselves, induced to the appropriation of space. The environments are devel-


oped in such a way as to provide different forms of uses and encounters. This versatility is achieved through a simple set of rectangular shapes that configure closely connected environments.


P A V I L I O N . 0 1 C O N C E P T U A L SUBJECTCS: DESENHO DE OBSERVAÇÃO II GEOMETRIA DESCRITIVA II TIPE: CONCEPTUAL MODEL

T H E P R O J E CT S TA RTS F R O M THE CHALLENGE OF DEVELOPING A CONCEPTUAL MODEL W H O S E R O O F P L A N R E S U LT S IN A SQUARE SHAPE, AS SHOWN. THE SHAPE WAS CONCEIVED THROUGH PLANNING CALCULATIONS, DEVELOPED M A N U A L LY W I T H T H E T O O L S O F D E S C R I P T I V E G E O M E T R Y.

M O D E L



E X T R A C U R R I C U L A R



41 | EXTRACURRICULAR

COMMUNITY SQUARE

IN PROGRESS

Tipe: INFRASTRUCTURAL Location: DUQUE DE CAXIAS, RJ Responsibilities: COORDINATION AND EXECUTION + Topographic mapping. + Facilitation of the project’s self-management process. + Execution Project description: Through a self-managed process, the project for a community square in the

EMERGENCY HOUSING

8 COMPLETE

Parque das Missões community, Duque de Caxias, emerged. The objective is to supply the need for a leisure area to practice light sports for the children and the elderly in the region. Attached to the project is the recently completed community garden.

Tipe: RESIDENTIAL Location: DUQUE DE CAXIAS, RJ Responsibilities: EXECUTION, LOGISTICS AND MAPPING + Manual execution throughout the construction phase. + Coordination of the logistics of delivery and handling of materials and equipment. + Prior mapping of the entire extension of the community in which the construction is carried out. Project description: The project consists of constructions of pre-molded wooden houses for families in emergency situations. The constructions are carried out in communities with low infrastructure and in which the NGO TETO (TECHO) operates in the state of Rio de Janeiro. It takes two to three days to complete, considering a team of ten volunteers, with entirely manual work from the foundation to the installation of the roof.


EXTRACURRICULAR | 42

WATER FOR ALL

COMPLETE

Tipe: INFRASTRUCTURAL Location: DUQUE DE CAXIAS, RJ Responsibilities: CONCEPTION AND COORDINATION + Development in the design and detailing phase. + Facilitation of the project’s self-management process. + Deployment mapping and design.

COMMUNITY GARDEN

COMPLETE

Tipe: INFRASTRUCTURAL Location: DUQUE DE CAXIAS, RJ Responsibilities: COORDINATION + Coordination of the execution team. + Technical consultancy. Project description: With a focus on food security in a region of precarious sanitation, the project brings the right to healthy food to the population of Parque das Missões, Duque de Caixias. A total of five flowerbeds and a composter currently make up the project. The exchange currency for the harvested food is a seed, generating the sustainability of the project managed entirely by the residents.

Project description: The project emerged as a priority during the health crisis, aiming to equally distribute piped water to all residents of the community of Parque das Missões, Duque de Caxias. Currently they have only a single spout and travel long distances to fill their gallons of water. At the end of the project, more than 400 people will be able to have running water in their homes.


ISSUU.COM/WILSON.JUNIOR WILSON.JUNIOR@FAU.UFRJ.BR


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.