Architecture Portfolio

Page 1

architecture portfolio professional & academic work

Wilson O. Herrera

Master Restauracion & Rehabilitacion De Espacios Universitat De Vic Bachelor Of Architecture Boston Architectural College



Wilson O. Herrera 7807 NW 66 Terrace Tamarac, Fl 33321 Wilson.o.herrera@gmail.com 786.406.6132

EDUCATION ABOUT Masters en Rehablilitacion y Restauracion de Espacios Universidad de Vic Barcelona, Spain 2013 Bachelor of Architecture Boston Architectural College Boston, MA 2012

Architecture is my passion and within I posses a strong drive to include technology in the discovery of construction problems and solutions to design. I am always searching for new and innovative ways to improve existing systems and processes. I believe that my exposure to various global cultures has given me a firm grasp on the many possibilities of solving a single problem and approaching these in several different ways. I look to continue seeking new solutions and new challenges and as a result continue growing as an architect and citizen of the world.

PROFESSIONAL EXPERIENCE

Consultant for infrastructure and historic preservation Icultur - Instituto de cultura y turismo de Bolivar 2013 - Present │Cartagena , Colombia Oversee public funding and construction development for historic preservation projects, procure funding, draft and review documents for public bidding and formulate projects for new infrastructure. • Restoration and maintenance of the San Antonio de Padua church - National Historic Landmark - Simiti, Bolivar • Construction of 6 cultural centers across the state of Bolivar

15% 5% 10%

Arquitecto Alberto Herrera Arquitectos

2013 - Present │Cartagena, Colombia

Assist in the construction oversight and 3D design and engineering coordination of historic preservation projects. • Partial restoration, structural reinforcement and adaptive reuse of the “Intendencia Fluvial” Barranquilla, Colombia.

2011 - 2012 │ Boston, MA

2007 - 2010 │ Boston, MA

AWARDS, AFFILIATIONS & INTERESTS _Registered Architect in Colombia - South America _Volunteer at Techo Colombia - Non profit organization which seeks to overcome poverty in Latin America slums _Herbert Glassman Practice Award - 2011 _John Heman Pilling Architecture Design Scholarship - 2010 _Glassman/Bailey Traveling Scholarship - 2010 _Speaker at Association for Preservation Technology International/ Montreal 2008 _Secretary of the Atelier at The Boston Architectural College 2008-2009 ( Student Government) _Vice President, American Institute of Architecture Students BAC Chapter (2006-2008)

15%

BIM Detailing Existing Conditions Documentation Historic Preservation Rendering Parametric Design Construction Administration

3D design and engineering coordination, developed projects from schematic design to construction documents. • Cambridge Innovation Center - 5th Floor, expansion - Boston, MA • Access Northeast Colo 21 Expansion - Marlborough, MA • Bldg 10 Elevator improvements -MIT - Cambridge, MA

Drafting, administrative support, field surveying, identification of building pathologies, existing conditions documentation, red lines, 2D and 3D engineering coordination, construction administration on different projects from schematic design to construction document. • MIT - E-25 Animal Facility Renovation - Cambridge, MA • Department of Homeland Security HQ - St Elizabeth Hospital - Washington, DC • University of Virginia - New Cabell Hall Renovation - Charlottesville, VA • US Post office and Courthouse - Brooklyn, NY • West Facade and Tower Preservation - Trinity Church - Boston, MA

15% 20%

Project Manager Studio Troika

Intern Architect Goody Clancy

20%

Skills

SKILLS 4.5

Revit

4.0

Autocad

3.0

Microsoft Project

4.5

Microsoft Office

3.0

Skecth Up

2.0

Grasshopper/Rhino

4,0

Adobe Creative Suite


As consultant for infrastructure for the institute of culture and tourism for the state of Bolivar, I proposed the expansion of the state’s cultural infrastructure by replicating a prototype for a music school across the state. The next step was to find the appropriate towns where construction was to take place and to develop the proposal to petition the funds from the Colombian central government. The proposal was approved and an appropriation of approximately six million U.S. dollars was secured, enough for the construction

2015

of 6 cultural centers. The design is the result of a competition organized by the Colombian Society of Architects for the Colombian Ministry of Culture. The winning design is by Colombian architects Espacio Colectivo, the project has been featured recently on the Online architecture magazine Archdaily. The project is currently in construction. The images below belong to the construction of the prototype by the Colombian Ministry of Culture. Images by Santiago Robayo

Cultural Centers (In Construction)

Bolivar - Colombia Construction / Govermnet / Public Professional Work | Project Manager Icultur Instituto de Cultura y Turismo de Boiva Cartagena contacto@Icultur.gov.co


Intendencia Fluvial (Built)

Barranquilla - Colombia Adaptive Reuse / Public Professional Work | Project Architect Alberto Herrera Arquitectos, Cartagena alberto.herrera@hdarquitectura.co

2014

Adaptive Reuse of the old Intendencia Fluvial or “River port” on the banks of the Magdalena river in Barranquilla, Colombia. A two story, 7535 sq ft building, dating back to the 1910’s that served as the main boarding point for fluvial passenger transport. The structured was abandoned around 1990. The republican style facade was restored, followed by the adaptation of versatile gallery space on the main level; open workspaces as well as offices

on the second level were also introduced. All new systems were coordinated in Revit for incorporation. In order to preserve the volume and form of the roof without increasing the cost of maintenance, the structure was made out of aluminum instead of the original wood trusses. This new structure was left exposed, no dropped ceiling, as it was a substantial component of the budget, becoming a significant part of the design.


L;as necesidades son: Oficinas Que? Para poder progresar en su misión, la empresa pres- Área de exposición Área de conferencias y presentaciones cinde de unas cede en la ciudad de Barcelona con Inversion│Inmobiliaria│Internacional dos propósitos , !1o de manera as importante es de Área de servicios- Lavados y almacenamiento exaltar los proyecto que se este llevando acabo y Barcelona un el despacho de trabajo en donde se lleven acabo Donde? L’eixample - Barcelona, Spain esfuerzos de mercadeo y coordinación de visitas por posibles inversionistas a la ciudad para. En el espacio El espacio esta localizado en l’Eixample de Barcelona Academic se Work | Masters Final Project pondrán en exposición los diferentes proyectos y en el edificio 314 Aragón, con cruce con la calle Bruc. Rehabilitacion de se Espacios también realizaran charlas y presentaciones.

IIIB

Universitat de Vic │Barcelona Prof. Jordi L;as Planelles - Salvans necesidades son:

Oficinas exposición Project forÁrea thedeadaptive reuse steel structure, concrete Área de conferencias y presentaciones and rehabilitation of a comfloors). The space is reconÁrea de serviciosLavados y almacenamiento

Presentación

2

1

1

A 3.2

A 3.0

A 3.1

0.00

mercial bay in the emblematic figure by creating of a gallery/ Donde? “L’eixample” neighborhood in exhibitions space, highlighted the heart of Barcelona. After vertically by the use of specific El espacio esta localizado en l’Eixample de Barcelona research of the building’s hanging lighting fixtures. The en el edificio 314 Aragón, con cruce con la calle Bruc. typology, and urban fabric of wood element unfolds and with the neighborhood, a single orthe use of light, other required ganizing, modular and versatile programmatic spaces, such element to be constructed out as workspaces, offices and a of wood was proposed. Wood conference room are demarwas chosen as to “warm” cated. All within the constraints the space, in contrast to the of the given commercial bay mostly industrial finishes of while minimizing the impact on the existing context (brick, the existing shell.

Presentación

B

Inversión Inmobiliaria Internacional Barcelona

B

Inversión Inmobiliaria Internacional Barcelona

Propuesta Anteproyecto C/ Aragón, 314 Barcelona 26.11.2012 Arquitecto Wilson O. Herrera

Cue Cu

AL

P

1

2

1

1

A 3.2

A 3.0

A 3.1

CORTE DD 1 : 50

Concept - Spatial definition BAU Escuela Superior de Diseño Postgrado en Rehabilitacion de Espacios

Aragón 321. Bajos 2. 08009 Barcelona - Cataluña

DEPACHO Y SHOWROOM DE IIIB

CORTE Fecha

Proyecto Ejecutivo

Dibujado Por

A 3.

17/04/2013 WOH Escala

Main Facade ALTILLO 2.85

1

Aragón 321. Bajos 2. 08009 Barcelona - Cataluña

TABIQUE CON FORJADO & FALSO TECHO 1 : 10

DEPACHO Y SHOWROOM DE IIIB

Fecha Proyecto Ejecutivo

Dibujado Por

A 5.1

17/04/2013 WOH Escala

2014

Render

DETALLES - CAJA

1 : 10

2013


Circulo Ecuestre Casa Perez Samanillo Barcelona

L’eixample / Diagonal - Barcelona, Spain Propuesta Anteproyecto asa Perez Samanillo - 1910 - Modernismo Catalán C/ Aragón, 314 Barcelona 26.11.2012 Academic Work502-504 | Masters Final Project Dirección. AvenidaO.Diagonal Arquitecto Wilson Herrera Restauracion de Espacios

Universitat de Vic │Barcelona Arquitecto. Joan Josep Hervas i Arismendi Prof. Mariona Genis

Ficha de caracterizaciones elaborada por Wilson O. Herrera

0.1 0

1.6 0

2 0

1.5

0

4.0 5

3.0 0

0.2 5

Escala

Wilson O. Herrera

Dibujado Por

PROYECTO DE RESTAURACION

Fecha

Author 17/04/2013

6/18/2013 5:38:35 PM

2.65

0.2 5

reflejos : casa perez - samanillo

BAU Escuela Superior de Diseño

2.9

0 0.1

Calle Balmes, 169Bis 08006 Barcelona ‐ Catalunya

7

Percepcion espacial iluminacion

Postgrado en Restauracion de Espacios

1.6

reflejos : casa perez - samanil

Proyecto de Restauración Circulo Ecuestre - Barcelona Wilson O. Herrera

0.1 0

Academic Project about “Casa Perez manship, it was challenging to grasp Sammanillo”. The project offered the the precise execution of the details opportunity to document the typological due to ornamentation found throughintricacy of the interior of a Catalan out the composition of the space. renaissance style residence. The task The proposal showcases these Teniendo en cuenta el carácter evolutivo del edifico esta ficha de caracterización de basara en tres etapas was to solve how to best showcase the different detail elements individually, ORIGINALthe 1910lighting conditions of interior by means of an audio-guided byPrimera_ changing tour. The proposal was a system that the space. Using low pressure sodium Segunda_ TRANSICIÓN (reformas mayores anos 30 y 40) would display the highly ornamented vapor light bulbs in the existing light interior without compromising the Ecuestre fixtures introducing black metal Tercera_ CIRCULO - Circulo de Barcelona while _Estado Actual existing original finishes. tunnels with LED spot lighting which While the interior preswould frame and reveal the intricacy ents a high level of the “highlighted” detail, whether it of craftswould be the floors, walls sideboards, 3.0 0 reflejos : casa perez - samanillo walls paper, floor mosaics, plaster Tema Principal castings or marble detail on the stair..

As indicated

A106

Tunel

1.60

0

(2) of Planta Principal

Escala

1 : 100

2.60

13

Author

Dibujado Por

6/18/2013 5:35:18 PM

A103

17/04/2013

Fecha

Tunel

Wilson O. Herrera

Cotas 3 Alzado A106 1 : 50

Postgrado en Restauracion de Espacios

PROYECTO DE RESTAURACION

Tunel

py of Planta Principal

100

Calle Balmes, 169Bis 08006 Barcelona ‐ Catalunya

PANEL INFORMATICO CORTADO EN CHAPA CON PLASMA, RETROILUMINADO

Revestimientos Verticales

0.11

Circulo Ecuestre

A106

0.45

3

3.00

0.25

0.00

2 Sección A102 1 : 75

1

BAU Escuela Superior de Diseño Postgrado en Restauracion de Espacios

Calle Balmes, 169Bis 08006 Barcelona ‐ Catalunya

PROYECTO DE RESTAURACION Wilson O. Herrera

Cortes Fecha Dibujado Por

A102

17/04/2013 Author Escala

2013

Nivel 1

1 : 75

6/18/2013 5:33:41 PM

2.60

Percepción espacial iluminacion

1 A106

1.60

BAU Escuela Superior de Diseño

1

2 Copy A106 1 : 20

1 Sección A102 1 : 75


Cambridge Innovation Center 5th Floor Expansion

Cambridge innovation center takes a new approach to the idea of innovative incubation for startups. The design was conceived as a space for multiple “communities”.The concept for the layout of the spaces was developed in Rhino, then translated into Revit for the development of construction documents and coordination of the MEP systems and structural design. The team used BIM technology for interference detection among the different disciplines, as well as for smooth design adjustment. Modeling all systems in revit allowed to translate the community concept into a constructible and useful space within the constraints of the existing core and shell.

1/2 (Built)

Cambridge, MA Commercial / TI

3' - 7"

2' - 1"

Professional Work | Project Manager Studio Troika, Boston Rob@studiotroika.coom

3' 0

STAIR - 2 RISERS

3

HANDRAIL EXTENSION

IN IN " M 2" M 12 1

2 3' 3/4 "

1

CONSULTANTS

5' - 1 3/4"

14' - 7 1/4"

PIAZZA 5010

9' - 11 1/2"

3' - 4 1/2"

SLOPE SURFA CE 1:20 MAX SLOPE

5009

SKIM COAT ALL WALLS

5009

ELEVATOR LOBBY

6' -

4" 6 1/

# DESCRIPTION

EQ

" 1/4

24 A 5.4 6

CONFERENCE 5006

G1

G1

A41

Callout (2) of PARTITION PLAN 1/4" = 1'-0"

A41

A41

3' -

5003

2

1' - 11"

FUTURE BAR PROVIDED BY OWNER SINK LOCATION

7 A 5.4

3/4" 1' - 0 1' - 7"

5006

1 1/ 4"

RAISED FLOOR FFE +18"

1/2"

" -3

10

2'

1' -

3/4"

4" 9 3/

1' - 11

3' - 2"

1' - 8 1/2"

-4

5006G

1' - 6"

2' -

1/2"

1' - 6 1/4"

2

2'

/4" 8 1/ 4"

G1

5001A 0' - 0"

1" -1

7' - 0 3/4" STAIR - 2 RISERS

2

SLOPE SURFACE 1: 20 SLOPE MAX 1' - 4 3/4" 1' - 2 1/4" 2' 21 /2" 2' -1 0 3/4 " A41

23 2' - 0

DATE

6' - 0"

2'

6' - 11 1/4"

01

A64

1' - 6"

1

G1

4' - 2 1/4"

189.36°

12" MIN

2' - 0 3/4"

4' - 5 3/4"

1' - 0"

2' - 8"

2

1' -

REVISIONS

5004

RAMP 1:12 MAX SLOPE

2

2' -

2

CORRIDOR

2

A 6.2

5007

A41

EQ

3' - 0"

4' - 0 1/4"

5007

CONFERENCE

5001A

A41 IN "M 12

A41

-0 "

0' - 10 3/4"

A41

5001 2

12" MIN

3'

5008

2

12" MIN

8' - 0"

VESTIBULE

4' - 1 1/4"

12" MIN

6' - 4 1/2"

5008

6 A 5.1

2

4' - 1 3/4"

1

G2

/4"

t: 781 388 3313 f: 781 388 3323

3/4"

CONFERENCE

3' - 0"

03

incorporated

67 maplewood street malden, ma 02148-4320 www.studiotroika.com

5001B

(N.I.C.)

2

3' - 4

ACOUSTICAL GLASS PARTITION

6' - 0"

2

1' - 0"

2' -

TROIKA

E RAISED FLOOR FFE +12"

1/2 "

studio

F 2' - 5"

2' - 11 3/4"

5005B

5005A LOCKED MAINTENANCE ACCESS DOOR

NOTES

CLOSET 5003

KEY NOTES:

CPT-2

1

1

OUTSIDE DECK (N.I.C.) FUTURE PHASE

1

CUSTOM CASEWORK, FRAMING BY GC, FINISH BY OWNER

2

WOOD RAILING, CROSS SECTION & WOOD SPECIES TO BE DETERMINED BY OWNER

3

WORKSURFACE / COUNTER PPROVIDED BY OWNER, INSTALLED BY GC

4

FIRE-RATED STRUCTURE TO BUILD UP RAISED AREAS, JOISTS @ 16"OC. TO BE SHEATHED WITH 2 LAYERS OF FIRE-RATED PLYWOOD AND WILL INCLUDE SMOKE BARRIERS NOT GREATER THAN 150SF, SEE DETAIL 7 ON A6.0

THIS DOCUMENT, AS AN INSTRUMENT OF SERVICE, IS THE SOLE PROPERTY OF STUDIO TROIKA. ITS USE BY THE OWNER FOR OTHER PROJECTS OR FOR COMPLETION OF THIS PROJECT BY OTHERS IS STRICTLY FORBIDDEN. DISTRIBUTION IN CONNECTION WITH THIS PROJECT SHALL NOT BE CONSTRUED AS PUBLICATION IN DEROGATION OF THE DESIGNER'S RIGHTS. ©2008, STUDIO TROIKA. PROJECT TITLE

CIC 5TH FLOOR ONE BROADWAY CAMBRIDGE, MA 02142 PHASE

100% DESIGN DEVELOPMENT DRAWING TITLE

GENERAL NOTE: All raised floor areas shall be engineered by general contractor to meet all code compliant loading criteria, and be stiff enough to minimize footfall noise in the space. All raised floor areas shall be constructed such that the space between the floor slab and the underside of the wood flooring shall be filled with an approved material to resist the free passage of flame and products of combustion or fireblocked in such a manner that there will be no open spaces under the flooring that will exceed 100 square feet (9.3 m2) in area and such space shall be filled solidly under permanent partitions so that there is no communication under the flooring between adjoining rooms.

F

E

2012

Callout of PARTITION PLAN 1 1/4" = 1'-0"

PROJECT NUMBER DATE DRAWN BY: CHECKED BY:

LEGEND CUSTOM MILLWORK

1

ENLARGED PLAN PIAZZA & ELEVATOR LOBBY

BLOCKING @ 3', 5' & 7' A.F.F.

The construction shall not be constructed of combustible materials, unless the space between the fire-resistance-rated floor assembly and the flooring is either solidly filled with noncombustible materials or fireblocked in accordance with Section 717, and provided that such open spaces shall not extend under or through permanent partitions or walls.

530.50

02-29-2012 Author Checker

A 3.0 Scale

As indicated


CIC 5TH FLOOR

Cambridge Innovation Center 5th Floor Expansion

ONE BROADWAY CAMBRIDGE

N

A Ge A A A A A A A A Ar A A A A A A A A A A A A A A A A A A A A A A A A El E0 E0 E0 E0 E1 E1 E1 E2 E2 Fi FP FP FP M M M M M M M M Pl P0 P1 P1 P2

2/2 (Built)

Cambridge, MA Commercial / TI Professional Work | Project Manager Studio Troika, Boston Rob@studiotroika.coom

REF. REF.

LOCUS MAP

GRAPHIC SCALE 0

100

200

300

400

LOCUS MAP

2012


modul phasin

The project is about evolutionary morphology and its applicability to architecture. The concept was to redesign the library by deconstructing its programmatic function, through the lens of evolutionary biology. Concluding that libraries are obsolete as a repository of paper and need to change to accommodate for the exchange of live, interactive, person-to-person information. A system was devised for “morphing” the existing infrastructure, Boston City Hall, using elements from the its formal vocabulary, and reusing these elements overtime to create a new, enhanced, evolved spaces. The shape and location of these elements, is a direct reaction to the external forces from the community and their needs. With the use of grasshopper and paramedic design, many formal possibilities were explored, always using the same “genes” from the Boston City hall building to generate architecture.

Cusp

Genetics & Architecture Morphology of the library for the sake of relevancy in the 21st century

(1/2)

Academic Work | Graduating Project Bachelor of Architecture Boston Architectural College│Boston Prof. Russ Higgins

structure

M

E

P

raised boardwalk raised boardwalk raised boardwalk raised boardwalk

siza/quinta de malagueira 77 Utilities

phasing for infrastructure

carmassi/san michelle in bor- future phase conection go 04 M

E

P

stage stage stagestage

stage 1

siza/quinta de malagueira 77 2013

Utilities

phasing for infrastructure

reinterpretation for competition in argentina / community space

Transportation & Market Transportation & Transportation & Market Market Transportation & Market

collab spaces collab spaces

reinterpretation for competition in argentina / community space


Cusp

Genetics & Architecture Morphology of the library for the sake of relevancy in the 21st century

(2/2)

Academic Work | Graduating Project Bachelor of Architecture Boston Architectural College│Boston Prof. Russ Higgins

stage 2

stage 3

stage 2

stage 3

stage 2 stage 2

stage 3 stage 3

takeover 2012


Commercial / Data Center Professional Work | Project Manager Studio Troika, Boston Info@studiotroika.coom

1 - A 0.7

02_Underside of Deck 27' - 1 1/4"

02_Underside of Deck 27' - 1 1/4"

18' - 0"

15' - 0"

3' - 0"

Phase 2 Roof 18' - 0"

4' - 4"

00 GROUND 0' - 0" Site -4' - 4"

00 GROUND 0' - 0" Site -4' - 4"

4' - 0"

incorporated 67 maplewood street t: 781 388 3313 malden, ma 02148-4320 f: 781 388 3323 www.studiotroika.com

CONSULTANTS

Phase 2 Roof 18' - 0"

00 GROUND 0' - 0"

00 GROUND 0' - 0" Site -4' - 4"

REVISIONS

Elevation 2 - a 1/8" = 1'-0"

Section 1 1/8" = 1'-0"

# DESCRIPTION

5

A1

Elevation 2 - a 1/8" = 1'-0"

ADDENDUM 1

DATE REVISIONS

5/18/2012

# DESCRIPTION

A1 2

2

1 - A 0.7

1 - A 0.7

5

50' - 4"

1 - A 0.7

1 - A 0.7

5

50' - 10"

50' - 4"

50' - 10"

5/18/2012

5

2

1 - A 0.7

1 - A 0.7

DATE

ADDENDUM 1

1 - A 0.7

1 - A 0.7

2

Adaptation and addition to a warehouse space for a data-center “clean room” for cloud computing. The project demanded the construction of a small building for the mechanical cooling units, as well as the integration of power plants to fulfill the electrical requirements. The project was focused on the coordination of all the mechanical, electrical and plumbing requirements within the constraints of the small addition using Revit. The structural and electrical coordination was done layering the 2D drawings onto the Revit models. Below are images of the completed chiller building, clean room and power generators.

Phase 2 Roof 18' - 0"

5 2

CONSULTANTS

02_Underside of Deck 27' - 1 1/4"

Phase 2 Roof 18' - 0"

Site -4' - 4"

incorporated 67 maplewood street t: 781 388 3313 malden, ma 02148-4320 f: 781 388 3323 www.studiotroika.com

studio

2

3 1 - A 0.7

TROIKA TROIKA

studio

2 1 - A 0.7

02_Underside of Deck 27' - 1 1/4"

5

NOTES FOR DESIGN PURPOSES ONLY. NOT FOR CONSTRUCTION. VERIFY ALL DIMENSIONS IN FIELD. NOTES FOR DESIGN PURPOSES ONLY. NOT FOR CONSTRUCTION. VERIFY THIS DOCUMENT, AS AN INSTRUMENT ALL OF DIMENSIONS SERVICE, IS THE SOLE IN FIELD. PROPERTY OF STUDIO TROIKA. ITS USE BY THE OWNER FOR OTHER PROJECTS OR FOR COMPLETION OF THIS PROJECT BY OTHERS IS STRICTLY FORBIDDEN. DISTRIBUTION IN CONNECTION WITH THIS PROJECT SHALL NOT BE CONSTRUED AS PUBLICATION THIS DOCUMENT, AS AN INSTRUMENT OF SERVICE, IS THE SOLE IN DEROGATION OF THE DESIGNER'S RIGHTS. PROPERTY OF STUDIO TROIKA. ITS USE BY THE OWNER FOR

©2008, STUDIO TROIKA.

OTHER PROJECTS OR FOR COMPLETION OF THIS PROJECT BY OTHERS IS STRICTLY FORBIDDEN. DISTRIBUTION IN CONNECTION WITH THIS PROJECT SHALL NOT BE CONSTRUED AS PUBLICATION IN DEROGATION OF THE DESIGNER'S RIGHTS. ©2008, STUDIO TROIKA.

PROJECT TITLE

00 GROUND 0' - 0"

ACCESS NORTHEAST COLO 21 PHASE 1A NORTHEAST ACCESS 34 ST.MARTIN DRIVE. COLO 21 PHASE 1A MARLBORO, MA

UP

PROJECT TITLE

UP

Site -4' - 4"

UP

UP

UP

3' - 10 1/2"

e "

(Built)

Marlborough, MA

3' - 10 1/2"

D "

Xand (Formerly Access Northeast) Data Center

34 ST.MARTIN DRIVE. MARLBORO, MA

UP PHASE

CONSTRUCTION DOCUMENTSCONSTRUCTION DOCUMENTS PHASE

DRAWING TITLE

Phase 1-B Preliminary drawings Phase 1-B Preliminary drawings DRAWING TITLE

PROJECT NUMBER

4

Colo 21 -1B - Roof Plan 1/8" = 1'-0" Colo 21 -1B - Roof Plan 4 1/8" = 1'-0"

1

Floor Plan - COLO 21 Phase 2 1/8" = 1'-0" Floor Plan - COLO 21 Phase 2 1 1/8" = 1'-0"

DATE

DRAWN BY: CHECKED BY:

Scale

670.10

PROJECT NUMBER 04-30-2012

DATE

Author

DRAWN BY: Checker CHECKED BY:

670.10 04-30-2012 Author Checker

1 - A 0.7 1 - A 0.7 As indicated

Scale

As indicated

2012


Studio Troika was brought into the project by WSP Flack + Kurtz. The scope was the elevator upgrade for building 10 at Massachusetts Institute of Technology. The location of the mechanical room is at the dome of the building that houses one of the school’s most important libraries. The project started by translating a point cloud capture into a Revit model. The model was then delivered to WSP for the integration of the mechanical systems, allowing for the coordination of these systems to be done virtually. The result was the successful upgrade of the elevator without major construction problems, and an updated mechanical room that met all required building codes.

Massachusetts Institute of Technology Bldg 10 - Elevator Improvements (Built)

Cambridge, MA Institutional Professional Work | Project Manager Studio Troika Rob@studiotroika.com

2011


Residential Projects Colombia Residential

Professional Work | Project Architect Wilson Herrera Diaz, Arquitecto Wilehedi@gmail.com

Collection of residential design projects done using Revit to be able to illustrate design options for clients. In addition to the use as design composition element, the trellis is used as a brisole due to the location of the projects; in the Caribbean coast of Colombia where high temperatures can be observe year round.

2011


Department of Homeland Security HQ St Elizabeth Hospital Washington, D.C. Historic Reservation / Public

Professional Work | Project Team Goody Clancy jean.carroon@goodyclancy.com

National Historic Landmark – Design project for the new headquarter campus for the Department of Homeland Security, featuring a mixture of adaptive reuse and new construction. Additionally the project will connect Homeland Security with an operations center as well as the new United States Coast Guard headquarters. Participation in the project was to assess and catalog existing conditions and document each building’s repair history, creating a database that linked to the electronic building model and the construction documents.

2010


New Cabell Hall Renovation University of Virginia (Built)

Charlottesville, VA Historic Preservation / Institutional Professional Work | Project Team Goody Clancy jean.carroon@goodyclancy.com

This comprehensive and detailed restoration returned the building to its original intent. New Cabell Hall houses the modern language departments, media studies, graduate studies, and the Dean of Arts and Sciences. The design strategy was to incorporate day lighting to the corridors for aesthetic improvements and strong connections to the exterior courtyard, which was redesigned to become a building amenity.

2010


The Hacienda of Dreams is an academic project inspired by the architecture of Luis Barragan. For this studio the class traveled to Mexico and spent 10 days experiencing and learning the culture and visiting some of Barragan’s most emblematic buildings. The result of the studio is a lakeside hotel in Mexico, the exploration of the different hues of a single color due to the intensity and angle in which light hits an object is what led to the exploration of folding planes to create spaces that showcase this idea.

12

Hacienda of Dreams Lake Chapala - Jalisco, Mexico

Academic Work | Advance Studio Project Bachelor of Architecture Boston Architectural College│Boston Prof. Luis Montalvo Prof. John Pilling

tiveR ne lan euqam ed nóiculoseR

22

2010


Brooklyn Courthouse and Post-office Exterior Restoration (Built)

Brooklyn - New York , NY Historic Reservation / Public Professional Work | Project Team - Drafter Goody Clancy jean.carroon@goodyclancy.com

The historic Duberstein Courthouse of Romanesque Revival style architecture from the turn of the 20th century, occupies an entire city block in downtown Brooklyn. The goal of the 6-year, exterior envelope restoration was to restore this landmark to its original grandeur and to ensure its stability, and function.

2009


Trinity Church in the City of Boston

West Facade Restoration Boston , MA Historic Reservation / Religious

Professional Work | Project Team Goody Clancy jean.carroon@goodyclancy.com

Registered National Historic Landmark - assessed and cataloged existing conditions of the west facade (entry facade) for the Richardsonian Romanesque Building, in preparation for the installation of the restored stained glass window; Continuing with the design for repairs and replacement details for the damaged pieces in areas at the exterior, interior wall and towers.

Goody Clancy

Goody Clancy

Client:Trinity Church of Boston Project: West Wall Exterior Restoration Role: Drafter/surveyor My role on this project consisted in the drafting of schematic design documents Client: Trinity Church of Bosto and theProject: initial documentation areas to Re West Wall of Exterior be repair. This was a extremely rewarding tion opportunity as I got to be lifted to the west Role: Drafter/surveyor wall of trinity church and see firsthand the My role on this project consisted exquisite design of the architecture as well a drafting execution of schematic design docum the wonderful by the builders.

and the initial documentation of ar be repair. This was a extremely rew opportunity as I got to be lifted to wall of trinity church and see firsth exquisite design of the architecture the wonderful execution by the bu

2008


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.