Format for WAP Core meeting Dec 2nd What
10 am
Introduction – Why meet and review now?
10.15am What has been achieved to date and
Led by: Maria
How
Tracy
Please refer to WAP’s ‘Work To Date’ within the suite of Docs and Notes on Automatic Transmission, to inform this discussion. Please refer to the ‘What WAP Can Do For Wiltshire Council and ACESW’ paper
current work in progress, e.g. workgroups
10.45
What’s changed from 2 years ago? Where are the opportunities and threats?
11.15
What we believe the ecology’s needs are that WAP could serve.
Maria
15 min break for coffee
12
What would we like to see in 3-5 year’s time? Who could our partners be?
12.30
12.45
1.00
1.15
1.30
Out of these identified areas of need, which do we feel fit into WAP’s objectives and which should we seek to achieve? What mechanisms do WAP have/ need to develop in order to be able to achieve these outcomes Deryck to present Creative Wiltshire Key objectives
Bullet point priorities This will provide a list of Headings that may form the basis for a G4A bid
Please refer to the paper ‘Creative Wiltshire a Summary’ and ‘Creative Wiltshire – How WAP might join’
With WAPs key areas of work defined identify any duplication with the Creative Wiltshire Model Do we all agree that a G4A is the right next step? Agree plan and process, including consultation with the members, and conversations with potential partners Sign up a working group to help with the G4A Finish
Wiltshire Arts Promoters, Development Manager, Tracy Sullivan, C/O Arc Theatre Trowbridge, College Road, Trowbridge, Wiltshire, BA14 0ES Tel: 07540 938936 email wiltshireartspromoters@gmail.com