Fireworks British Airways Case Study

Page 1

\ British Airways Data Centre Case Study \ British Airways chose HydramistŽ Watermist technology for fire suppression at London’s busy Heathrow Airport. The installation protects critical operations within the busy data centre of the international airline. Project BA decided to install a high pressure Watermist fire suppression system to protect their ground floor rotary UPS power generation machinery at their data centre in London Heathrow. The project was deemed critical as the UPS machines work in conjunction with incoming mains power to ensure that BA can process the huge administration associated with running a major airline.

Solution Fireworks designed, supplied and installed a local application style solution using our engineering skills to design and fabricate steel frames around each UPS machine to mount the piping and water mist nozzles on to give best placed protection.

Requirements The frames were designed to be removable without disconnecting any pipework to allow for annual machinery maintenance without the need for shutting the entire mist system down and without the requirement for repeated pipe.


For further information on our products and services please call 0800 975 7462 or visit the website today.

Fireworks Fire Protection Ltd Amber House Station Road Attleborough Norwich, Norfolk NR17 2AT 0800 975 7462 www.fireworks-ltd.com fireworks@fireworks-ltd.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.