Wokingham Borough News Winter Edition 2018

Page 13

Winter 2018 13

www.twitter.com/WokinghamBC

MAJOR NEW HIGHWAYS UPDATE We are making strategic improvements to Wokingham Borough’s road network to serve our growing communities. North Wokingham Distributor Road (NWDR)

South Wokingham Distributor Road (SWDR)

• NWDR is being built in sections, with some completed by residential developers that will join up with the segments we are building. Once completed, it will connect the A329 London Road to the A329 Reading Road

• SWDR, like the NWDR, is also being built in sections. The Eastern Gateway part of it received planning permission last February and work is due to start next year.

• West of Old Forest Road would link the A329 Reading Road to Toutley Road. An exhibition last summer gave people the chance to ask questions and tell us what they thought about the project before the planning application was submitted. • There are a number of sections of the NWDR currently under construction which include Bell Foundry Lane, Keephatch Beech and Kentwood Farm West.

Winnersh Relief Road • Planning permission for Phase 2 (B3030 King Street Lane to A329 Reading Road) was granted in October. Work preparing the site for construction is due to start soon. • We will be widening Lower Earley Way to provide two lanes in each direction, between the Loddon Roundabout and the new junction with the Winnersh Relief Road.

• The Spine Road section is due to be submitted to planning in the New Year alongside new housing applications from the developers. • The Western Gateway section is at the preliminary design stage. • Once completed the SWDR will link the A329 London Road to the A321 Finchampstead Road.

Barkham Bridge • We have finished consultation with local residents and other key stakeholders including the Environment Agency. A detailed design of the scheme is now being finalised with construction due to start next year.

Arborfield Cross Relief Road Planning permission was granted last January and construction is due to start in the spring.

More information: www.wokingham.gov.uk (search ‘major new roads’) and/or (search ‘major developments newsletter’)


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

What's On this winter...

1min
page 29

Are you affected by crime or abuse?

1min
page 26

Up on the Boardwalk

1min
page 18

Swallowfield volunteers win Queen's award

1min
page 18

Opening doors for key workers

1min
page 18

Anyone for Squash?

1min
page 22

Loddon Valley Leisure Centre and Carnival Pool Updates

1min
page 22

Green health

1min
page 16

Their opinions count

1min
page 16

It's all in the planning

1min
page 21

Find the trees from the wood

1min
page 21

What has developer funding actually done?

1min
page 24

Recycling tours fully booked

2min
page 30

Help us stop inappropriate developments

1min
page 26

Please check if you can fell a tree

1min
page 22

Watch this space!

2min
page 23

Don't be alone on Christmas Day

1min
page 15

Top tips to keep warm and well this winter

1min
page 15

Major new highways update

1min
page 13

Street light project nearly finished

1min
page 12

Keeping you in the know - highways

1min
page 12

Borough Plan update

1min
page 10

Tackling litter is EASI

1min
page 8

Kissing gates welcome walkers in Hurst

1min
page 8

The green grass of your new communities

1min
page 27

Putting children first and foremost

1min
page 25

Fostering a new beginning for older living

1min
page 19

Working as one for Guy

1min
page 17

It's all in the name

1min
page 14

Give a child the future they deserve

1min
page 11

Community spirit runs deep on Gorse Ride

1min
page 9

Christmas shopping in Wokingham Town Centre

1min
page 7

Inspiring tomorrow's writers

1min
page 6

Food for thought helping the environment

2min
page 5

Roll of honour for community champions

1min
page 4

Welcome

1min
page 3
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.