Contents XL 1. Doggiadu Master Plan, Shanghai 2. Shanghai Dream Center, Shanghai 3. The Royal Altlantis, Dubai 4.Empire City, Ho Chi Minh 5. Sino Ocean Indigo, Beijing L 1. 252 East 57 Street, New York 2. Ross Business School , University of Michigan 3. City Point, Brooklyn 4. Hamburg Science Center, Germany M 1. BWI_Baltimore Washington International Airport 2. National Holdings Headquater, Abu Dhabi 3. PS 315, Queens 4. Dogok Villa, Seoul S 1. Garage Coffee, Gahoedong, Seoul 2. Pilates The Fit, Dogokgdong, Seoul 3. Ask Alice Shoes Showroom, New York 4. Communication on Color, San Antonio 5. Touch Space, Seoul Foundation Arts and Culture A 1. Archiitectural Monads, Harvard University GSD 2. Monocoque, Harvard University GSD 3. Mix : Program, Havard University GSD 4. Jameica Plain Housing, Harvard University, GSD 5. Gwangbok Street Renovation, Competition 6. Memory Columns, Competition 7. Pattern : Case Synthetics Interligence, Havard University GSD 8. Sterotomic Permutation, Comptition 9. Mutant Triangle
XL 2 Sangwook Park
1. Dongjiadu Master Plan, Shanghai 2. Shanghai Dream Center, Shanghai 3. The Royal Atlantis, Dubai 4. Empire City, Ho Chi Minh 5. Sino Ocean Indigo, Beijing Sangwook Park 3
Dongjiadu Master Plan
Professional Works | KPF
Program : Master Planning and Towers and HQ Building Location : Shanghai, China Client : CMJYI Project Team : Robert Whitlock(Design Principal) , Sean Roche (Project Manager) Project Year : 2015 ~ Total Area : 700,700 sm Publicatoin / Award : MIPIM Asia Award Gold (11.30.2014)
The Dongjiadu Project (i.e. the plot development project of No. 616 and 735 Block of Xiaodongmen Subdistrict) is located at a crucial node of the financial aggregation belt of the Bund in Shanghai. The project is positioned to be a new urban financial landmark in Shanghai that pools capital. Right across the Huangpu River is its counterpart, Lujiazui area. In the future, the Central Park and the Riverside Viewing Deck will become the most representative landscape zone along the bank of the Huangpu River. It will also become a town that runs 24/7 where global financial resources and leisure consumption experiences are aggregating. The completion of the Dongjiadu project will further accelerate the formation of the financial aggregation zone of the Bund, raise the innovative finance and financial service industry within this zone to a new level, and inject new vitality to the urban development of Shanghai.
4 Sangwook Park 空中花园
terraced gardens
董家渡
| Dongjiadu
LOT H | gardens in the sky |
空中花园
27
gardens in the sky |
H地块
空中花园
20
32
Sangwook Park 5
TOWER 3
OFFICE ZONE 3
MECH.
OFFICE ZONE 3
REFUGE / MEP
REFUGE / MEP TOWER 4
OFFICE
OFFICE ZONE 2
MECH.
REFUGE / MEP
OFFICE
OFFICE ZONE 1
OFFICE
OFFICE ZONE 2
REFUGE / MEP
REFUGE / MEP
OFFICE
OFFICE ZONE 1
REFUGE / MEP
RETAIL
RETAIL
LOBBY
RETAIL
RETAIL
RETAIL
RETAIL
1
North South Section @ Tower 3
6 Sangwook Park
735 街坊地块项目 Dongjiadu, Shanghai, PRC
Owner
Tel: 33355333 Fax: 33355566
Architectural Design Consultant
Kohn Pedersen Fox Associates PC Architects & Planning Consultants 11 West 42nd Street New York, NY 10036 Tel: 1-212-977-6500 Fax: 1-212-956-2526 1 A-215
2 A-215 H
Local Architect & Structural Engineer
ECADI - East China Architectural Design & Engineering Institute Co., Ltd. A131004031
H
151 Hankou Road Shanghai, PRC Tel: +86 21 63217420 Fax: +86 21 63291107 Commercial Design Consultant
Aedas 31/F One Island East, 18 Westlands Road Quarry Bay, Hong Kong Tel: +852 2861 1728 Fax: +852 2529 6419 Residential Design Consultant
GOA Tel: - Fax: Mechanical-Electrical-Plumbing Engineer
Parsons Brinkerhoff Tel: 021 6113 3000 Fax: 021 6113 3100 Quantity Surveyor
Tel: - Fax: Curtainwall Consultant
Tel: - Fax: Lighting Consultant
Tel: - Fax: -
Landscape Consultant
DLC Unit 304, Building 28, Xin Tian Di 119 Ma Dang Rd., Shanghai, 200021, PRC Tel: 021 6386 7426 Fax: 021 6386 7425 Traffic Consultant
MVA Tel: 852 2529 7037 Fax: 852 2527 8490
Filename: Q:\Projects\2386_Dongjiadu\Drawings\CAD\Sheet\100% SD PACKAGE\A_H-101 Podium_Level 01 Plan.dwg Plotted by: Laemmel, Edward Plot Time: 10/7/2015 7:33 PM
1 A-205
H
LEVEL 01 (LOBBY) + 0.00M T.O.F.F.
-
---
NO.
ISSUANCE
---- -- -DATE
LEVEL 01 (LOBBY) + 0.00M T.O.F.F.
N
KEY PLAN
DATE
2015/10/07
SCALE
NTS
PROJECT NUMBER
2386-002
DRAWING TITLE
Podium_Level 01 Plan
Podium Ground Plan @ Plot H
1
GROUND PODIUM PLAN
DRAWING NO.
SCALE: 1:200
A_H-101 © 2015 KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.
CHINA MINSHENG DONGJIADU PROJECT 小东门616 、 735 街坊地块项目
1 A-205 H
CHINA MINSHENG DONGJIADU PROJECT 小东门616 、 735 街坊地块项目
1 A-205 H
Dongjiadu, Shanghai, PRC
Dongjiadu, Shanghai, PRC
600
Owner
Owner
4100 Tel: 33355333 Fax: 33355566
57750
Tel: 33355333 Fax: 33355566
54250
Architectural Design Consultant
45500
42000
Kohn Pedersen Fox Associates PC Architects & Planning Consultants 11 West 42nd Street New York, NY 10036 Tel: 1-212-977-6500 Fax: 1-212-956-2526
3500
12250
8750
Architectural Design Consultant
3500
Kohn Pedersen Fox Associates PC Architects & Planning Consultants 11 West 42nd Street New York, NY 10036 Tel: 1-212-977-6500 Fax: 1-212-956-2526
Local Architect & Structural Engineer
Local Architect & Structural Engineer
ECADI - East China Architectural Design & Engineering Institute Co., Ltd. A131004031
ECADI - East China Architectural Design & Engineering Institute Co., Ltd. A131004031
151 Hankou Road Shanghai, PRC Tel: +86 21 63217420 Fax: +86 21 63291107
151 Hankou Road Shanghai, PRC Tel: +86 21 63217420 Fax: +86 21 63291107
Commercial Design Consultant
Commercial Design Consultant
Aedas
Aedas
31/F One Island East, 18 Westlands Road Quarry Bay, Hong Kong Tel: +852 2861 1728 Fax: +852 2529 6419
31/F One Island East, 18 Westlands Road Quarry Bay, Hong Kong Tel: +852 2861 1728 Fax: +852 2529 6419
Residential Design Consultant
Residential Design Consultant
GOA Tel: - Fax: -
GOA Tel: - Fax: -
Mechanical-Electrical-Plumbing Engineer
Mechanical-Electrical-Plumbing Engineer
Parsons Brinkerhoff
Parsons Brinkerhoff
Tel: 021 6113 3000 Fax: 021 6113 3100
Tel: 021 6113 3000 Fax: 021 6113 3100
Quantity Surveyor
Quantity Surveyor
Tel: - Fax: -
3500
Tel: - Fax: Curtainwall Consultant
Curtainwall Consultant
Tel: - Fax: -
Tel: - Fax: -
Lighting Consultant
Lighting Consultant
Tel: - Fax: -
Tel: - Fax: -
Landscape Consultant
Landscape Consultant
DLC Unit 304, Building 28, Xin Tian Di 119 Ma Dang Rd., Shanghai, 200021, PRC Tel: 021 6386 7426 Fax: 021 6386 7425
DLC Unit 304, Building 28, Xin Tian Di 119 Ma Dang Rd., Shanghai, 200021, PRC Tel: 021 6386 7426 Fax: 021 6386 7425 Traffic Consultant
MVA
15750
Traffic Consultant
MVA
28000
35000
Tel: 852 2529 7037 Fax: 852 2527 8490
43750
47250
28000
Tel: 852 2529 7037 Fax: 852 2527 8490
LEVEL 24 (OFFICE) + 106.5M T.O.F.F.
7000
45500
LEVEL 06 (OFFICE): LEVEL 07 (OFFICE): LEVEL 08 (OFFICE): LEVEL 09 (OFFICE): LEVEL 10 (OFFICE):
3500
1
SCALE: 1:100
---- -- -DATE
---- -- -DATE
14000
N
1750
KEY PLAN
DATE
2015/10/05
SCALE
NTS
LEVEL 25 (OFFICE): LEVEL 26 (OFFICE): LEVEL 28 (OFFICE): LEVEL 29 (OFFICE): LEVEL 30 (OFFICE): LEVEL 31 (OFFICE): LEVEL 32 (OFFICE): LEVEL 33 (OFFICE):
DRAWING TITLE
T3_Level 05-10 Plan_Office Zone 1
1750
7000
45500
DRAWING NO.
A_H-105 © 2015 KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.
CHINA MINSHENG DONGJIADU PROJECT 小东门616 、 735 街坊地块项目
1
LEVEL 24-33 PLAN
DRAWING TITLE
T3_Level 24-33 Plan_Office Zone 2
DRAWING NO.
SCALE: 1:100
A_H-124 © 2015 KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.
CHINA MINSHENG DONGJIADU PROJECT 小东门616 、 735 街坊地块项目
1 A-205 H
Dongjiadu, Shanghai, PRC
Owner
Owner
Tel: 33355333 Fax: 33355566
49000
Tel: 33355333 Fax: 33355566
2900
Architectural Design Consultant
Architectural Design Consultant
Kohn Pedersen Fox Associates PC Architects & Planning Consultants 11 West 42nd Street New York, NY 10036 Tel: 1-212-977-6500 Fax: 1-212-956-2526
3500
NTS 2386-002
PROJECT NUMBER
+111.0M +115.5M +124.5M +129.0M +133.5M +138.0M +142.5M +147.0M
Level 24-33 Floor Plan @ Zone 2
Dongjiadu, Shanghai, PRC
2900
8750
2015/10/06
SCALE
TYPICAL FLOORS (T.O.F.F.):
2386-002
PROJECT NUMBER
H
50750
--ISSUANCE
N
1 A-205
42000
NO.
24500
--ISSUANCE
DATE
+25.5M +30.0M +34.5M +39.0M +43.5M
LEVEL 05-10 PLAN
Level 5-10 Floor Plan @ Zone 1
H
NO.
KEY PLAN
TYPICAL FLOORS (T.O.F.F.):
1750
2 A-205
H
600
600
Filename: Q:\Projects\2386_Dongjiadu\Drawings\CAD\Sheet\100% SD PACKAGE\A_H-124 T3_Level 24-33 Plan_Office Zone 2.dwg Plotted by: Laemmel, Edward Plot Time: 10/7/2015 7:34 PM
12250
14000
2 A-205
1750
Filename: Q:\Projects\2386_Dongjiadu\Drawings\CAD\Sheet\100% SD PACKAGE\A_H-105 T3_Level 05-10 Plan_Office Zone 1.dwg Plotted by: Laemmel, Edward Plot Time: 10/7/2015 7:33 PM
LEVEL 05 (OFFICE) + 21.0M T.O.F.F.
Kohn Pedersen Fox Associates PC Architects & Planning Consultants 11 West 42nd Street New York, NY 10036 Tel: 1-212-977-6500 Fax: 1-212-956-2526
Local Architect & Structural Engineer
Local Architect & Structural Engineer
ECADI - East China Architectural Design & Engineering Institute Co., Ltd. A131004031
ECADI - East China Architectural Design & Engineering Institute Co., Ltd. A131004031
151 Hankou Road Shanghai, PRC Tel: +86 21 63217420 Fax: +86 21 63291107
151 Hankou Road Shanghai, PRC Tel: +86 21 63217420 Fax: +86 21 63291107
Commercial Design Consultant
Commercial Design Consultant
Aedas
Aedas
31/F One Island East, 18 Westlands Road Quarry Bay, Hong Kong Tel: +852 2861 1728 Fax: +852 2529 6419
31/F One Island East, 18 Westlands Road Quarry Bay, Hong Kong Tel: +852 2861 1728 Fax: +852 2529 6419
Residential Design Consultant
Residential Design Consultant
GOA Tel: - Fax: -
GOA Tel: - Fax: -
Mechanical-Electrical-Plumbing Engineer
Mechanical-Electrical-Plumbing Engineer
Parsons Brinkerhoff
Parsons Brinkerhoff
Tel: 021 6113 3000 Fax: 021 6113 3100
Tel: 021 6113 3000 Fax: 021 6113 3100
Quantity Surveyor
Quantity Surveyor
Tel: - Fax: -
Tel: - Fax: -
Curtainwall Consultant
Curtainwall Consultant
Tel: - Fax: -
Tel: - Fax: -
Lighting Consultant
Lighting Consultant
Tel: - Fax: -
Tel: - Fax: -
Landscape Consultant
Landscape Consultant
DLC Unit 304, Building 28, Xin Tian Di 119 Ma Dang Rd., Shanghai, 200021, PRC Tel: 021 6386 7426 Fax: 021 6386 7425
DLC Unit 304, Building 28, Xin Tian Di 119 Ma Dang Rd., Shanghai, 200021, PRC Tel: 021 6386 7426 Fax: 021 6386 7425 Traffic Consultant
MVA
Tel: 852 2529 7037 Fax: 852 2527 8490
Tel: 852 2529 7037 Fax: 852 2527 8490
38500
38500
42000
28000
Traffic Consultant
MVA
Level 41-44 Floor Plan @ Zone 3 49000
1
LEVEL 41 PLAN SCALE: 1:100
2 A-205
H
H
1
FANG AN SUBMISSION BACKGROUNDS 2015 09 24
-
---
NO.
ISSUANCE
NO.
ISSUANCE
DATE
---- -- --
N
DATE
N
KEY PLAN
KEY PLAN
1150
Filename: Q:\Projects\2386_Dongjiadu\Drawings\CAD\Sheet\100% SD PACKAGE\A_H-146 T3_Level 46-50 Plan_Office Zone 3.dwg Plotted by: Laemmel, Edward Plot Time: 10/7/2015 7:35 PM
1150 1750
LEVEL 46 (OFFICE) +205.5M T.O.F.F.
2 A-205
14000
Filename: Q:\Projects\2386_Dongjiadu\Drawings\CAD\Sheet\100% SD PACKAGE\A_-H-141 T3_Level 41 Plan_Office Zone 3.dwg Plotted by: Laemmel, Edward Plot Time: 10/7/2015 7:35 PM
LEVEL 41 (OFFICE) +183.0M T.O.F.F.
DATE
DATE
2015/10/06
SCALE
TYPICAL FLOORS (T.O.F.F.):
2386-002
LEVEL 47 (OFFICE): LEVEL 48 (OFFICE): LEVEL 49 (OFFICE): LEVEL 50 (OFFICE):
DRAWING TITLE
T3_Level 41 Plan_Office Zone 3
DRAWING NO.
A_H-141
2015/10/01
SCALE
AS NOTED
PROJECT NUMBER
Level 45-50 Floor Plan @ Zone 3
1
LEVEL 46-50 PLAN
NTS
PROJECT NUMBER
+210.0M +214.5M +219.0M +223.5M
2386-002
DRAWING TITLE
T3_Level 46-50 Plan_Office Zone 3
DRAWING NO.
SCALE: 1:100
© 2015 KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.
A_H-146 © 2015 KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.
Sangwook Park 7
Dream Center
Professional Works | KPF Program : Mixed Used Location: Shanghai, China Client : LAN Kwai Fong Project Team : Richard Nemeth (Managing Principal), Josh Chaiken (Design Principal) Project Area : 124,769 sm Project Year : 2014 ~ 2015 ( Under Construction ) Publication / Award : MIPIM Asia Award Bronze ( 11.30.2016 ) he waterfront complex situated on a choice parcel south of the city’s historic Bund district reflects a concerted desire by Chinese government officials to encourage the development of what they call “cultural industries.” A joint project of DreamWorks Animation, the private equity firm China Media Capital, and Hong Kong-based developer Lan Kwai Fong Group, major funding is from state-run China Development Bank Capital. The eastern portion of the two-block master plan is home to a pair of creative office towers, which angle slightly as they rise above the complex. The towers serve to anchor the development vertically, tying in with a theater building and an arts building at ground level, one of which features an open-air rooftop garden. Situated on the grounds of a shuttered cement factory, the complex will have five major live-performance venues with 8,500 seats in total, including a 3,000-seat facility housed in a dome where cement was once mixed. In addition to hosting international productions of musicals and dramas, the DreamCenter is envisioned as a magnet for pop, rock, and jazz concerts; sporting events from mixed martial arts to motorbike racing; fashion shows and awards ceremonies; and conferences, art fairs, and exhibitions.
8 Sangwook Park -3-
上海梦中心 SHANGHAI DREAM CENTER
-5-
上海梦中心
WALL TYPE A 阴影盒背板(铝板喷涂背板) Shadow Box (Painted Aluminum Back Pan)
玻璃单元 (Low-E 中空玻璃) Glazing Unit (Low-E IGU) 楞面边缘(铝板喷涂) Chamfer Edge (Painted Aluminum)
ENLARGED SECTION
WALL TYPE PERSPECTIVE SHANGHAI DREAM CENTER SEPTEMBER 11, 2014
ENLARGED PLAN 4
WALL TYPE B
铝板(银灰色) Aluminum Sheet Cladding (Bright Silver Paint)
玻璃单元 (Low-E 中空玻璃) Glazing Unit (Low-E IGU)
铝板(深灰色) Aluminum Sheet Cladding (Dark Grey Paint) 造型装饰条(铸铝) Fin (Cast Aluminum)
阴影盒背板(铝板喷涂背板) Shadow Box (Painted Aluminum Back Pan)
ENLARGED SECTION
铝制换气扇 Aluminum Ventilator
WALL TYPE PERSPECTIVE SHANGHAI DREAM CENTER SEPTEMBER 11, 2014
ENLARGED PLAN 6
Sangwook Park 9
WALL TYPE C
阴影盒背板(铝板喷涂背板) Shadow Box (Painted Aluminum Back Pan)
玻璃单元 (Low-E 中空玻璃) Glazing Unit (Low-E IGU)
金属造型装饰条(浅灰色) Metal Fin (Bright Silver Paint)
铝板(深灰色) Aluminum Sheet Cladding (Dark Grey Paint)
ENLARGED SECTION
铝制换气扇 Aluminum Ventilator
WALL TYPE PERSPECTIVE SHANGHAI DREAM CENTER SEPTEMBER 11, 2014
ENLARGED PLAN 9
WALL TYPE D
玻璃单元 (Low-E 中空玻璃) Glazing Unit (Low-E IGU) 阴影盒背板(铝板喷涂背板) Shadow Box (Painted Aluminum Back Pan)
铝板(银灰色) Aluminum Sheet Cladding (Bright Silver Paint) 铝板(深灰色) Aluminum Sheet Cladding (Dark Grey Paint)
ENLARGED SECTION
WALL TYPE PERSPECTIVE
10 Sangwook SHANGHAI DREAM CENTERPark SEPTEMBER 11, 2014
11
ENLARGED PLAN
WALL TYPE E
玻璃单元 (Low-E 中空玻璃) Glazing Unit (Low-E IGU)
铝板(深灰色) Aluminum Sheet Cladding (Dark Grey Paint)
铝板(深灰色) Aluminum Sheet Cladding (Dark Grey Paint)
ENLARGED SECTION
WALL TYPE PERSPECTIVE SHANGHAI DREAM CENTER SEPTEMBER 11, 2014
14
ENLARGED PLAN
WALL TYPE F
铝质穿孔板(铜色) Perforated Natural Anodized Aluminum (Bronze Color)
ENLARGED SECTION
WALL TYPE PERSPECTIVE SHANGHAI DREAM CENTER SEPTEMBER 11, 2014
ENLARGED PLAN 16
Sangwook Park 11
Empire City
Professional Works | NBBJ Program : Mixed Used Location: Hochimin City, Vietnam Client : Empire City Project Team : Arnold Lee (Design Principal) Jonathan Wall (Managing Princiapal) Project Area : 129,551 sm Project Year : 2016 ~ 2017 ( Under Construction ) Empire City (MU4, MU7) is part of the mega-developments planned for Thu Thiem in Ho Chi Minh City, a 14.5-hectare area just next to the mouth of the Thu Thiem tunnel running below the Saigon River that is set to include several infrastructure projects as well as a five-star hotel, highend shopping complex, offices, serviced apartments, and underground parking. The project site consist of four residential towers on podium creating amenities, internal courtyard and retail on along the main street. The square towers are located at the corner of the site (MU4, MU7) in order to create view toward old CBD area and Saigon river while decreasing view interruption between towers. In terms of sustainable design, that allows maximum daylight without blocking another. The typical floor plan of towers has been developed based on local culture and climate. Each side has one slot for natural ventilation for kitchen or utility room in backside of unit to have natural ventilation. In terms of structure, the shear wall are efficiently located along the inside of the slot. This kind of issue is very common in east asia due to culture and climate and the solution was very successful to achieve the requirement in terms of both macro and micro scale.
12 Sangwook Park
Sangwook Park 13
A
B
C
D MASSING DIAGRAM
14 Sangwook Park
TYPICAL FLOOR PLAN OF TOWER
Sangwook Park 15
Sino Ocean Indigo Professional Works | NBBJ
Program : Mixed Used Location: Beijing, China Client : Sino Ocean Project Team : Tim (Design Principal) Nancy (Managing Princiapal) Project Area : 26,547 sm Project Year : 2017 ~ 2018 ( in progress )
16 Sangwook Park
Sangwook Park 17
Space to Foster Relationships
助长人际关系的空间
COWORKING
ROOF GARDEN
BLACK BOX
CAFETERIA
GYM
协同工作
屋顶花园
电影院
咖啡厅
健身中心
SUPERMARKET 超市
MEDICAL OFFICES 医疗办公
STACKED ATRIUMS & COLLABORATIVE OFFICE AREAS 叠加中庭和互动办公区
ART SPACE 艺术空间
全区总图
颐堤港Ⅱ期城市综合体项目JT-627地块 Sino-Ocean Land Commercial Real Estate Division
远洋地产商业地产事业部
SPORTS & ENTERTAINMENT 体育和娱乐
CHILD CARE 育儿
Indigo PH2 Mixed Use Project Plot JT-627
将台路 Jiangtai Rd
全区总图
G
25
Overall Site Plan
K J
December 29, 2017
A
将台路 Jiangtai Rd I K J
G
H M
A
I H
F
M
K G L
G
C
F K G L
G
I
C
B
北侧零售 North Civ Retail
I B
市民中心 北侧零售 南侧城市公园 North Civic Center South Urban Park M Retail
公园边界 Park Edge
M
H H
图例 Key F
G
F
G
C
C
A
市民中心 Civic Center
B
G
I
D
I J
F
下沉广场 Sunken Plaza
C
南侧城市广场 South Urban Park
D
公园边缘 Park Edge
E
L
L D
M
北侧零售广场 North Retail Plaza G
办公室下客 Office Drop-Off
F
公众艺术 Public Art
G
下B1车道 Ramp Down to B1
H
J
E
M
F
E
零售溢出空间 Retail Spill Out Space
I
灵活的开放空间 Flexible Open Space
J
水景 Water Feature
K
H
H
绿化屋顶 Green Roof
L
屋顶露台 Roof Terrace
M
Scale: 1 = 1500m
坝河 Bahe River 0
10m
20m
40m
60m
80m
坝河 Bahe River 远洋地产商业地产事业部
颐堤港Ⅱ期城市综合体项目JT-627地块 Sino-Ocean Land Commercial Real Estate Division
18 Sangwook Park
远洋地产商业地产事业部
Indigo PH2 Mixed Use Project Plot JT-627
December 29, 2017
颐堤港Ⅱ期城市综合体项目JT-627地块 Sino-Ocean Land Commercial Real Estate Division
30
Indigo PH2 Mixed Use Project Plot
Sangwook Park 19
The Royal Atlantis Professional Works | KPF
Program : Hotel Location: Dubai Client : The Roayl Atlantis Project Team : James von Klemperer (Design Principal), Elie Gamburg (Director), Terri Cho (Project Manager) Project Year : 2014 ~ 2015 (Under Construction) Publication / Award : Galere Magazine (05.19.2017)
16 11 9
6
16
16
7
11
10
9
8
5 4 15
15
6
16 13
12
15
12
7
14
14
10
2
8
5 4
3
15
3
15 13
12
15
12
14
2
3
Hotel
F+B
Residential
Conference
Amenities
BOH/Parking
1 2 3 4 5 6 7 8
Marine Stadium Resort Beach Hotel Pools Conference Center Spa Hotel Tower Sky-Pool Residential Tower
14
9 10 11 12 13 14 15 16
Penthouse Suite Bridge Suites Observatory Suites Lagoon Gardens Lobby Townhouses F&B/Amenity MEP Penthouse 9
20 Sangwook Park
Hotel
F+B
Residential
Conference
1 2 3 4 5 6
Marine Stadium Resort Beach Hotel Pools Conference Center Spa Hotel Tower
9 10 11 12 13 14
Penthouse Suite Bridge Suites Observatory Suites Lagoon Gardens Lobby Townhouses
Royal Atlantis will be the next iconic hotel and residential building in Dubai. The biggest criticism of apartment life there is the minimal amount of outside space. In addition, with the city’s scorching temperatures, which can climb to 122 degrees, a novel approach was required. The first is a seamless transition from indoor to outdoor living. 231 condominiums will incorporate generously-sized private terraces a lot about passive ventilation and solar control. The project is located in a zone with the gulf behind you and the lagoon in front, so there’s a constant breeze coming from one direction The solution was to break the traditional slab building into a network of terraces, most of which will have their own pools. In addition, the building shape as a stack of Lego blocks is partially about optimizing views, but it’s also about maximizing lateral winds. The project will be completed in th fall of 2019.
Site Plan
Sangwook Park 21
L 22 Sangwook Park
1. 252 East 57street, New York 2. Ross Businees School, University of Michigan 3. City Point, Brooklyn 4. Hamburg Science Center, Germany Sangwook Park 23
250 East 57th street Tower
Professional Works | SOM
Program : Residential Tower in New York, NY Client : World-Wide Group Architect of Record : SLCEArchitects,LLP Design Architect : SOM Project Team : Roger Duffy (Design Partners) Adam Semel (Director), Benjamin Porto, Sebastian Claussnitzer Project Year : 2010 ~ 2015 (Completion) Project Height : 715ft Unit : 271 unit Publication : CTBUH(02.12.2015)
24 Sangwook Park
A shimmering addition to the skyline, 252 East 57th Street is a 65-story luxury mixed-use tower in Midtown Manhattan. The building’s residential program is organized with rental units on the lower floors and high-end condominiums on the 36th floor and above. The unit mix — 173 rental apartments and 93 two- to five-bedroom condominiums — is positioned to maximize long-term value. A distinctive facade features a glazing geometry that employs inversions in the exterior wall to give the building a dynamic presence. From the highest floors, the tower’s inverted bay windows on the west and north elevations offer spectacular views of Central Park, while the east and south elevations overlook the 59th Street Bridge and the East River. The curved windows also function in defining and separating living spaces by swooping into the floor plan.
East
Southeast
South
Southwest
West
Northwest
North
Northeast
2. North at 650’
North
East
South
West
North
Flat Curtain Wall Area
East
South
West
Curved Curtain Wall Area
Interior View - Living Room
Sangwook Park 25
Diagram of Master Surface Geometry
Typtical Secttion Detail on Curve
26 Sangwook Park
Curve Derivation Top Profile
Curve Derivation Bottom Profile
Curved Curtain Wall Detail - curvature on the building out line is simplified as arc meeting to tangent of itslef. It make the manufacturing process more efficient avoiding to make thousands types of curved glass forming. In case of small gap between arc is covered by fins extened from itself as well as width of mullions. Spandrel glass is extened to the balcony for presenting the strong strip for appliying the same design language as the east or west facade.
Facade Mockup
Sangwook Park 27
Ross School of Business / Phase 2 Professional Works | KPF
Program : Education Location: Michigan, USA Client : University of Michigan Project Team : Jill Lerner(Managing Principal), William Pedersen(Design Principal), Phillip White(Project Manager) Project Year : 2014 ~ 2017 (Completion) Project Area : 100,000 SF Publication : Architects Newspaper (06.03.2014) In order to maintain its stature as the premier business school in the nation, the Stephen M. Ross School at the University of Michigan commissioned a master plan study to assess existing building capabilities and to determine whether the building should be renovated and rehabilitated or demolished and reconstructed. Challenges facing the program included providing a variety of instructional and meeting spaces to support the school’s action-based curriculum, and the need to create a physical center of gravity for the school’s intellectual and social life that would allow for informal as well as formal interaction between students, faculty, the university and the surrounding community. Essential to the success of the design of the new building was relating the typical tiered classroom to group study spaces. To do so, the design team developed a model for early site planning studies to address the pedagogical needs of the school, which focused on assessing the capacity of existing buildings to accommodate new teaching spaces. The results showed that to meet the school’s program requirements, certain portions of existing buildings would need to be demolished. Complicating the matter further was the school’s desire to remain in its current location on the university’s central campus. As such, demolition and new construction had to be coordinated with relocation strategies that integrated Ross School faculty and students within existing buildings.
28 Sangwook Park
Ross School of Business Phase II Construction Project
utes including tute and the n the top floor space with a function as a as a second tate of the art” exible student MONROE MALL
l also make improve the ersity Avenue stinct entrance welcome both employers as community. In l be improved ing spaces for rtyard and the orated by both d the location g the perimeter and new East
EAST BUILDING (New Construction)
R-BUILDING EAST UNIVERSITY AVENUE
TAPPAN STREET
KRESGE BUILDING (Renovation)
HILL STREET PARKING GARAGE
also free up and Wyly Hall oject), this will space near the
WYLY HALL FOW
1 1'-6"
usiness school
C
HILL STREET
2
11 3/4"
WD-2
4 A-361
1'-11"
LINE OF BENCH
7 A-3
6 1/4"
CURB BELOW SHOWN DASHED
FOW G4
WD-1
ol of Business uthern edge of mpus, bounded buildings and cent two story
(KRBL) EOS
SHAFT
3 3/4"
7 1/2"
CTW-2
B.2
EJ-1F
MISC MTL POST FOR ATRIUM WALL SUPPORT
SILL CLOSURE
AL-6
3"
16 GA. MIN TRIM ALL SIDES POST NO EXPO0SED FASTNERS
" 3/4
STL. ANGLE BELOW S.D.
Proposed Site Plan
EOS
4"
6 1/2"
NAB ATRIUM
FO CHANNEL
EOS EXIST
EJ-3A
he Stephen M hase I, the R 009.
GRILL
C.1
(NAB) EOS
STL. ANGLE BELOW S.D.
AL-6
WTE-1 @ SE ENTRY INSIDE CORNER
10
Site Plan
EJ-3A
SCALE: 1 1/2" = 1'-0"
WTE-1 ATRIUM OUTSIDE CORNER
4
SCALE: 1 1/2" = 1'-0"
1'-3"
PLAN DETAIL @ GALLERY Equally important was a sense of local identity, both for5 the building on the university campus and for distinct groups within the school. Respect for the language and history of nearby buildings on campus had to be balanced with the goal of projecting a forward-looking image for the school. At the same time, an internal arrangement of the building would need to create sense of community for the Ross School while serving the specific needs ofDESIGN its varied user groups. The new building meets these challenges set by the Ross School with -DRAFT CONCEPT SUBMISSION August 16, 2013 garden which opens directly to the street, providing a distinctive presence and a an organization of elements around a central winter WTE-1 ATRIUM / KRESGE INTERFACE @ WTE-4 MISC MTL ATRIUM WALL SUPPORT CLIP AT SLAB new “front door” forNABthe school on the University of Michigan campus. 3 18 1'-1 1/2" -VIF
SCALE: 1 1/2" = 1'-0"
FOF
10 1/2"
HSS POST CLIPPED AT FLOOR; SEE PLAN
C.1
CURB BELOW SHOWN DASHED
FOW
Executive Summary
L8"X6"X1/2" WITH (2) HILTI KWIK BOLT III EXPANSION ANCHORS W/ 4" EMBED
EJ-7
AL-5A
CLOSURE
EOS
SCALE: 1 1/2" = 1'-0"
AL-6
2
SCALE: 1 1/2" = 1'-0"
2.9
2'-9 1/2"
FOW
5'-3"
FOW
3
2'-5 1/2"
FOW
C-K 2
9 1/8"
3'-2"
3'-4 1/2" PROVIDE L5"X3"X1/2" ALONG SLAB EDGE AT L1 AND L2 FOR STUD SUPPORT
NAB ATRIUM SS-1
9 A-390 2'-7 1/2"
AL-6
1'-8 1/2"
1'-4" 2'-8 1/8"
Architect Kohn Pedersen Fox Associates PC 11 West 42nd Street New York, New York 10036 TEL: 212.977.6500 FAX: 212.956.2526
AL-5B
TYP.
7
PROVIDE REGLET AND L9"X4"X1/2" FLASHING @ L2 FOR TERRRACOTTA WALL SUPPORT 2'-0 3/8" V.I.F.
EJ-9
TYP WTE-1 ATRIUM MULLION SCALE: 1 1/2" = 1'-0"
NAB T.O. 3RD FL PPT +907'-4"
WTE-1 ATRIUM OUTSIDE CORNER
Mechanical, Plumbing, & Electrical Engineers AEI Affiliated Engineers SCALE: 1 1/2" = 1'-0" 5802 Research Park Boulevard Madison, WI 53719 Tel: 608.238.2616
1
Landscape Architect SmithgroupJJR, LLC 201 Depot Street, Second Floor Ann Arbor, MI 48104 Tel: 734.662.4457
8"
SEALANT
1'-11 7/8"
OVERFLOW DRAIN LEADER; COORDINATE LOCATION WITH OUTLET SHOWN ON A-205
B.O. PNL
Civil Engineer Midwestern Consulting 3815 Plaza Drive Ann Arbor, MI 48108 Tel: 734.995.0200
2'-6"
CURB BELOW SHOWN DASHED
1'-6 5/16"
2'-11"
8 1/2"
1 1/2"
2"
3 1/2"
E
11
10 1/2"
NAB 3RD FL +904'-10" TOS
AV Technology Consultant Shen Milsom & Wilke 417 Fifth Avenue New York, NY 10016 Tel: 212.725.6800
NAB ATRIUM ROOF +904'-6 1/2" TOS KRLB 3RD FL +904'-2" TOS
Specialty Lighting LAM Partners Inc. 84 Sherman St. Cambridge, MA 02140 Tel: 617.354.4502
WTE-1 ATRIUM @ INTERFACE WITH ER NEAR SE ENTRY SCALE: 1 1/2" = 1'-0"
2'-4 3/8" VIF
2'-1 3/8"
1'-4"
CLADDING AT BACK OF CURTAIN WALL ( NO EXPOSED FASTENERS) , TYP
1'-1 1/2" VIF
3/4"
3"
10 1/2"
11 3/4"
FOIL FACE VAPOR RETARDER SHOWN DASHED ,TYP
ENLARGED PLAN DETAILS - NAB BLDG PODIUM C:\KPF\Revit\2139_ARCH_KPF_MAIN_oelechi.rvt
1'-5 1/2"
FOW
SCALE: 1 1/2" = 1'-0"
EJ-3A
3"
FOW
FOW
EJ-3A
EJ-7 EJ-7
WTE-1 NAB ATRIUM / KRESGE INTERFACE @ LL LEVEL
16
SCALE: 1 1/2" = 1'-0"
WTE-1/WTE-4 @ ER ELEV LOBBY INTERFACE WITH ER
2
SCALE: 1 1/2" = 1'-0"
NOTES: 1. SEE A-393 FOR TYP TERRACOTTA ASSEMBL 2. ALL GLASS TO BE GL3. SEE A-411 FOR TYP R DTLS 4. REF 1 AND 2/A-013 FO AND UNDERSALB W/P D
KRESGE / NAB ATRIUM EJ @ ATRIUM ROOF SCALE: 1 1/2" = 1'-0"
0'
REGLET AND FLASHING
CONSTRUCTION DOCUMENTS 5 BULLETIN NO.6 4 DR7 3 DR6 2 DR5 ADDENDUM NO. 1 DESIGN DEVELOPMENT 1 DR3 ADDENDUM NO. 2
1'-1 1/2"
No. Issue Seal
SEALANT EJ-9
FOIL FACE VAPOR RETARDER SHOWN DASHED ,TYP
Glass Atrium Section Detail
6" MAX VARIES
B.O. PANEL
NAB T.O. 3RD FL PPT +907'-4"
1'-0"
0" 3"
AL-6
Sangwook Park 29
5"
CLADDING AT BACK OF CURTAIN WALL ( NO EXPOSED FASTENERS) , TYP
2'-6"
2'-4"
FOW
FOW
C.1
KRLB T.O. BDLG +933'-7"
3 1/2"
4 1/2"
4"
10"
EJ-8
3 1/2"
1'-5"
B.O. PIER
10"
20
1'-0"
A-330 4/2/2015 4:34:40 PM
2'-2"
5 3/8"
WTE-1 NAB ATRIUM / KRESGE INTERFACE @ 1ST FLR
AL-6
EJ-7
4 1/2"
SCALE: 1 1/2" = 1'-0"
3 7/8"
21
Geotechnical Engineer Soils& Materials Engineers Inc. (Owner's Consultant) 43980 Plymouth Oaks Blvd. Plymouth, MI 48170-2584 Tel: 734.454.9900
0" 3"
WTE-1 ATRIUM @ INTERFACE WITH ER ELEV LOBBY 1 1/2"
17
FOW
STN-2
EXISTING ER BUILDING
9 1/8"
FOW EXIST
FOW
2'-2" FOW
3'-1"
4 3/8"
FOW EXIST 10 1/2"
A
Structural Engineer Thornton Tomasetti 51 Madison Avenue New York, NY 10010-1603 Tel: 917.661.7800
4'-8"
LINE OF EOS SHOWN DASHED
1 3/4"
1'-4"
1'-1 1/2" VIF
Client The Regents of the University of Michigan 326 E. Hoover Avenue Ann Arbor, MI 48109-1002
D
16 A-361
4" 2'-6"
2'-1"
8 3/4" +/-
EOS AND CURB AT 3RD FLR ROOF SHOWN DASHED
FOIL TAPE AT BACK OF INSULATION
5 5/8"
11 3/4"
3" 6"
PROVIDE HSS 6"X6"X1/2" MISC MTL POST FROM L1 TO L3 SLAB FOR FOR ATRIUM WALL SUPPORT; SEE DTL 17 THIS SHEET FOR BASE PLATE DESCRIPTION; SEE DTL 18 THIS SHEET FOR CLIP AT L3
1'-2 1/2"
1'-2"
1'-5"
10 1/2"
FOW FOW
2"
EJ-7
PROVIDE HSS 4"X4"X1/2" MISC MTL POST FROM LL TO 3RD FLR SLAB FOR ATRIUM WALL SUPPORT; PROVIDE 1'-2"X1'2"X1/2" BASE PLATE AT LL WITH 4" X 1/2" HILTI KWIK BOLT III W/ 4" EMBED; SEE DTL 18 THIS SHEET FOR CLIPS AT L1, L2 AND L3
3"
FOF
AL-6 (INT CLADDING, NO EXPOSED FASTENERS)
1'-7 1/2"
14'-7" TO F.O. VEST
8 1/2"
2'-8 1/8"
1'-1 1/2" VIF
STEPHEN M. ROSS SCHOOL OF BUSINESS KRESGE RENOVATION & NEW ACADEMIC BUILDING
FOW
EJ-3A
4 1/4"
2 1/4"
UNIVERSITY OF MICHIGAN
SCALE: 1 1/2" = 1'-0"
SS-1 FOW
7"
RAIL-1B
WTE-1 SE ENTRY JAMB
2
2"
SS-1
6" NAB 5TH FL +932'-2" TOS
NAB 3RD FL +904'-10" TOS NAB ATRIUM ROOF +904'-6 1/2" TOS KRLB 3RD FL +904'-2" TOS
02 APR 2015 01 APR 2015 27 JAN 2015 25 NOV 2014 17 SEP 2014 11 JUL 2014 13 JUN 2014
Date
4"
hool of Business
nstruction Project
Exterior enclosure materials for the project will be similar to those provided for the Phase I Project. High performance curtain wall, glass and painted steel canopies, terracotta cladding, stone walls and site paving are the primary exterior materials. While using a similar palette for the exteriors - simpler and more energy efficient exterior wall assemblies will be studied in the Schematic Design Phase, including a reduction of the quantities of custom terracotta shapes & sizes as well as potential reduction in thickness of terracotta panel thickness. The team is also working closely with the MEP engineers to provide a higher performance envelope in order to reduce overall energy loads/consumption.
tubes (NE corner entry) WTE-1C:Curtain wall cladding supported by painted tube steel supports and skylight edges. (Stair towers) WTE-1D:Curtain wall cladding supported by slab with skylight edges. (Conf room volume at NW corner of East Bldg) WTE-1E:Curtain wall cladding with vertical vision glass/mostly opaque wall (Kresge west and lower south facades)
Fully grouted CMU backup wall with dampproofing, and sandstone cladding (with split face and bush hammered finishes). Dimensional stones individually supported. WTE-6 Perforated Metal Screen Wall Perforated painted aluminum plate screen wall with painted aluminum supports/subgirt system attached to existing precast concrete panels.
WTE-2 Bay Windows Thermally broken curtain wall with 1” IGU’s and low-e coating on #2 surface. Insulated shadow box assembly at spandrel/sill conditions. White frit on #2 surface (all glazing)
1. Wall Types
WTE-3 Curtain Wall with Terracotta Piers
WTE-1 Curtain Wall Thermally broken curtain wall with 1” IGU’s and low-e coating on #2 surface. Insulated shadow box assembly at spandrel/sill conditions. White ceramic frit on #2 surface at selected areas - all vision glass clear (no frit) to 8’-0”. Alternate: Triple glazed IGU’s.
Thermally broken curtain wall with 1” IGU’s and low-e coating on #2 surface. White frit on #2 surface at spandrel & sill conditions. Insulated shadow box assembly and painted aluminum panels at spandrel condition. Terracotta piers with 6” mineral fiber insulation attached to curtain wall. Alternate: Triple glazed IGU’s.
Detail descriptions/locations of WTE-1 (to be developed further in Schematic Design): WTE-1A:Curtain wall cladding and full skylights supported by painted steel tubes. (Level 05 galleries, south lower façade of East Building, upper south Kresge façade, hotel entry at SE corner of East Bldg.) WTE-1B:Curtain wall cladding with full skylights and projecting glass canopy supported by painted steel
WTE-7 Painted Aluminum Screen Wall 2. Roofing/Plaza/Terrace Types R-1 Plaza waterproofing with granite paving
WTE-4 Terracotta Rainscreen
R-2 EPDM roof with granite pavers on pedestals
Galvanized steel stud framing with gypsum sheathing, water/vapor barrier and mineral fiber insulation. Terracotta cladding (flat and fluted profiles) with aluminum subgirt support system.
R-3 High albido TPO roof with super insulation (R36) Alternate: Extensive green roof
WTE-5 Stone Walls
R-4 Intensive Green Roof / Terrace (Alternate at Kresge Rooftop)
Typical Terracotta Wall Detail
rior Materials
CONCEPT DESIGN SUBMISSION -DRAFT August 16, 2013
Circulation patterns are refined to link both existing and new building components into this new heart of the business school campus. An auditorium, tiered and flat classrooms and group study spaces—all equipped with state-of-the-art technology—open directly onto the winter garden, taking advantage of central student lounge areas and café seating. Faculty offices are organized in neighborhoods which look down on the winter garden from above its glass skylight. The building culminates at the top with a collection of major events and presentation spaces that look back over the university campus, taking advantage of spectacular views of surrounding buildings and campus open spaces.
UNIVERSITY OF MICHIGAN STEPHEN M. ROSS SCHOOL OF BUSINESS KRESGE RENOVATION & NEW ACADEMIC BUILDING Client The Regents of the University of Michigan 326 E. Hoover Avenue Ann Arbor, MI 48109-1002 Architect Kohn Pedersen Fox Associates PC 11 West 42nd Street New York, New York 10036 TEL: 212.977.6500 FAX: 212.956.2526 Structural Engineer Thornton Tomasetti 51 Madison Avenue New York, NY 10010-1603 Tel: 917.661.7800 Mechanical, Plumbing, & Electrical Engineers AEI Affiliated Engineers 5802 Research Park Boulevard Madison, WI 53719 Tel: 608.238.2616 Landscape Architect SmithgroupJJR, LLC 201 Depot Street, Second Floor Ann Arbor, MI 48104 Tel: 734.662.4457
D6
8-ER
2.7
(8"x3/8" PLATE)
Geotechnical Engineer Soils& Materials Engineers Inc. (Owner's Consultant) 43980 Plymouth Oaks Blvd. Plymouth, MI 48170-2584 Tel: 734.454.9900
D4
10"
10"
TILE AS SCHEDULED
8"X3/8" PLATE
SS-1
3 2'-8 1/8"
4" J6 1'-0" J6
3 1/8"
4"
EJ
J6
13
2
ELEV LOBBY
NEW CMU
15C9
EXIST CMU
J8
7" 3" LINE OF EXP JT. BELOW
2
(EXIST HATCH / REPLACE AS REQD AT NEW DOOR CUT IW)
EJ-3A
SS-1 (JAMB TRACK FOR OCS-1)
J6 2 NEW CMU
WD-2
TILE AS SCHEDULED ELEV LOBBY
ELEV LOBBY
ELEV P5 SHAFT
SS-1
CTW-2
EJ-3A
D4
EXIST CMU
ELEV P5 SHAFT
2
15C9
O5C9
SILL AS SCHEDULED
EJ-1AF
SS-1
EXIST CMU
2
J8
EJ-3A
EJ-3A
EJ-3A
CTW-2
J8
(EXIST PATCH / REPLACE AS REQD AT NEW DOOR CUT IW)
EJ
SS-1
EJ-1FA
EJ-1FA
EXIST CMU
NEW CMU
2 7/8"
EJ
SS-1
3"
6 1/2"
3"
SS-1
7"
3"
2 7/8"
3"
2'-0 3/8"
TILE AS SCHEDULED
MOUNTING ANGLES OUTSIDE GUIDE ANGLE INSIDE GUIDE ANGLE
EXPANSION JOINT/FIRE SHUTTER @ NAB / ER ELEVATOR INTERFACE
7
SCALE: 1 1/2" = 1'-0"
EXPANSION JOINT / FIRE SHUTTER SEPARTATION @ NAB / ER INTERFACE SCALE: 1 1/2" = 1'-0"
2
EXPANSION JOINT / FIRE SHUTTER SEPARATION @ NAB / ER INTERFACE SCALE: 1 1/2" = 1'-0"
CONSTRUCTION DOCUMENTS 3 BULLETIN NO.6 2 DR7 ADDENDUM NO.2 1 DR7 DESIGN DEVELOPMENT DD PRICING SET
D4
ELEV P5 SHAFT
NEW DOOR & FRAME
ELEV LOBBY
No. Issue
O5C9
22
SCALE: 1 1/2" = 1'-0"
17
EXIST TO REMAIN
3 1/8"
REMOVE EXIST BRICK FACING
REMOVE EXIST BRICK FACING
EXPANSION JOINT / FIRE SHUTTER SEPARATION @ NAB / ER INTERFACE 2ND FLOOR
4"
EXPANSION JOINT / FIRE SHUTTER SEPARTATION @ NAB / ER INTERFACE 2ND FLOOR
02 APR 2015 01 APR 2015 27 FEB 2015 27 JAN 2015 11 JUL 2014 09 JUN 2014
Date
Seal
2.7 EXIST TO REMAIN
AV Technology Consultant Shen Milsom & Wilke 417 Fifth Avenue New York, NY 10016 Tel: 212.725.6800 Specialty Lighting LAM Partners Inc. 84 Sherman St. Cambridge, MA 02140 Tel: 617.354.4502
4"
(JAMB TRACK FOR OCS-1)
3"
3"
CTW-2
2
3 1/8"
WD-8
SS-1 2
EJ
SCALE: 1 1/2" = 1'-0"
2 SS-1
D F
NORTH WEST CORNER @ NAB / ER INTERFACE 4"
2
3"
J6
3'-0 1/4"
2'-11 1/4"
D6
J6
Civil Engineer Midwestern Consulting 3815 Plaza Drive Ann Arbor, MI 48108 Tel: 734.995.0200
SS-1
WD-8
D6
D6
SCALE: 1 1/2" = 1'-0" J6 EJ
CTW-2
D6
F J8
2
5 3/8"
1 1/2"
WD-2
E
8-ER J6
8-ER
ELEV P5 SHAFT
EXIST TO REMAIN
2
REMOVE EXIST BRICK FACING
REMOVE EXIST BRICK FACING
2
EXIST CMU WALL ELEV LOBBY
ELEV P5 SHAFT
15C9
WD-2 ELEV LOBBY
WD-2
ELEV LOBBY
15C9
15C9
15C9 WD-2
ENLARGED PLAN DETAILS - INTERIOR
EXIST TO REMAIN
EJ
ELEV LOBBY
NEW DOOR & FRAME
EXIST ER EXT. WALL TO REMAIN EJ
REMOVE EXIST BRICK FACING
J8 2
EXIST TO REMAIN
WD-2
CTW-2 J6
CTW-2 ELEV P5 SHAFT
EJ EXIST EJP.JT. GASKET TO REMAIN
Date
EXIST EXP.JT. GASKET TO REMAIN ENLARGED PLAN DETAILS - INTERIOR C:\KPF\Revit\2139_ARCH_KPF_MAIN_mlabrake.rvt A-532 4/2/2015 4:29:26 PM
Scale
EXIST EXP.JT. GASKET TO REMAIN
2'-9"
KPF Project No.
June 9, 2014 1 1/2" = 1'-0" 2139
UM Project No. P00008367 New Academic Building: UM Bldg No. 5370
WD-2
C.2-ER
C.2-ER
NEW DOOR & FRAME
EXIST TO REMAIN
21
NAB / ER INTERFACE @ ELEVATOR LOBBY 2ND FLOOR SCALE: 1 1/2" = 1'-0"
EXIST TO REMAIN
16
NAB / ER INTERFACE @ ELEVATOR LOBBY 2ND FLOOR SCALE: 1 1/2" = 1'-0"
6"
EXIST. STRUCT. POST
2'-4"
2'-4"
11
NAB / ER INTERFACE @ SW CORNER 2ND FLOOR SCALE: 1 1/2" = 1'-0"
6
NAB / ER INTERFACE @ ELEVATOR LOBBY SCALE: 1 1/2" = 1'-0"
1
A-532
NAB / ER INTERFACE @ ELEVATOR LOBBY SCALE: 1 1/2" = 1'-0"
© 2015 KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.
Expansion Joint Plan Detail
30 Sangwook Park
2.9
2.7
7.1-ER
8-ER
2.2
8.2-ER
2
8'-8"
ER 5TH FL +916'-9" TOS
4 A-367
EXISTING INTERIORS AND EXTERIORS OF EXECUTIVE RESIDENCE AND SAM WYLY BUILDINGS NOT IN SCOPE SHOWN HATCHED, EXCEPT AS REQUIRED FOR THE DEMOLITION AND INTERIOR WORK RELATED TO THE EXTERIOR RECLAD AND OVERCLAD AS PART OF DESIGN ASSIST BY OTHERS
SIM
T.O. COPING 3'-7"
2'-6"
NAB T.O. 3RD FL PPT +907'-4"
2"
ER 4TH FL +908'-1" TOS
2'-6"
8'-8"
NAB 3RD FL +904'-10" TOS
4 A-360
10'-0"
8'-8"
14'-0"
16'-1"
ER 3RD FL +899'-5" TOS
SIM OPEN TO BEYOND
OPEN TO BEYOND
JT @ STACK 2'-6"
NAB 2ND FL +890'-10" TOS
5'-0"
ER 2ND FL +890'-9" TOS
2.9 10'-0"
16'-0"
17'-6"
17'-6"
ER LOW ROOF +885'-1" TOS
HPC-5 OPEN TO BEYOND
ER 1ST FL +874'-9" TOS
EXISTING LANDING AND CMU WALL TO BE DEMOLISHED
2'-6" 5'-0"
13'-4"
ACT-5 10'-0"
R1 FS
CTC-1 7'-6"
2599
SS-1 7'-6" PT-1 7'-6"
F V R4
PT-1 12'-7 1/2"
SS-1
P5 KRESGE
OCS
R15
R4 ACT-5 7'-6"
25E5
NAB
OCS
R4
EJ-3A
R4
R1 FS
F V
STAIR
?
F-K 25S6
?
CTW-1
FS
FS
OPEN TO BEYOND
2
SS-1 7'-6"
STORAGE
R1 FS CTC-1 7'-6" SS-1 7'-6"
EXISTING STAIR AND CMU WALL TO BE DEMOLISHED
16'-6 3/8"
EJ-2F
ELEV ROOM
9'-0 3/8"
17'-6" ER B1 FL +861'-5" TOS
2.2
SS-1 7'-6"
F BT
OPEN TO BEYOND
1'-5"
JT @ STACK NAB 1ST FL +873'-4" TOS
2.7
CANE RAIL
STORAGE
NAB 4TH FL +918'-2" TOS
The building, which has achieved LEED Silver certification, includes numerous sustainable design features. The design includes three green roofs with drip irrigation, underfloor air system, energy efficient lighting design, low consumption plumbing fixtures and on-site water retention/reuse, and the use of recycled content and locally manufactured construction materials to the maximum extent possible.
NAB LOWER FL +855'-10" TOS
OPEN TO BEYOND
SMOKE PORGE SHAFT
2'-6 1/2"
JT @ STACK
SUPPLY AIR DUCT AS ACHEDULED
1'-2 5/8"
5'-7"
KRLB 4TH FL +917'-6" TOS
LOCATION OF EXISTING FOOTING @ ELEVATOR PIT
KRLB B.O. SOFFIT +887'-3 1/2"
WT SUPPORT PER 23/A-411
7.1-ER
8-ER
6"
11
SECTION @ NORTH ER ELEVATOR
25
SCALE: 1/4" = 1'-0"
E
11 A-406
D
CEILING AS SCHEDULED
2 5/8"
HEAD @ KBL CIRC. SPACE / NAB INTERFACE SCALE: 1 1/2" = 1'-0"
19
BOTTOM OF SOFFIT
SEE 27/A-411 TRACK INTO JAMB TRACK
DOOR ON HOLD OPEN BEYOND 6" AXIOM TRIM
CEILING ( SEE RCP'S )
SCALE: 1/4" = 1'-0"
OPEN STUDY
RECEPTION
1567
1521D
SS-1
3 WALL HEAD 2.9 ALL GLASS @ FIRST FLOOR KBL / NAB INTERFACE SCALE: 1 1/2" = 1'-0"
15
PT-1 16'-6 3/8"
PRE-FINISHED WHITE TRACK ASSEMBLY.
JAMB TRACK BEYOND
WD-6
WD-6
SLIDING HORR. FIRE DOOR AS SCHEDULED SHOWN DASHED
2.7 EXP. JT. SECTION DETAIL @ 4TH FLOOR HORR SLIDING FIRE DOOR INTERFACE W/ KRESGE NORTH ATRIUM
2.2
2
14
SCALE: 1 1/2" = 1'-0"
ACT-1 13'-10"
KNIFEDEDGE
WD-6
SECTION DETAIL @ DOOR 35C1
14'-7" TO F.O.WOOD
ER 4TH FL +908'-1" TOS
19 A-635
R1
14'-1 3/8" (VIF)
FIN. FLOOR AS SCHEDULED
NAB T.O. 3RD FL PPT +907'-4"
EXSIT CMU SHOWN HATCHED
SUPPORT FOR BENCH SIM TO 6/A-613
1599
ACT-5 11'-6"
6"
SEE STRUCT DRAWINGS FOR
SUPPORT CONNECTION INFO PT-1 R1GROUND FL 15'-1 1/2" KRLB +873'-4" TOS
P5
R4
(2 1/2" STUDS) 2
2 1/2" STUDS @ 12" O.C. TO DECK ABOVE
S
DOOR ON HOLD OPEN
OCS
F V
ACT-5 EJ-3A 10'-0"
OCS
STAIR 15S6
R1
R4
SS-1
INSIDE GUIDE ANGLE
KRLB 2ND FL +890'-10" TOS
ER 3RD FL +899'-5" TOS
OC
R4
15E5 EJ-3A
R4
FS
ER 3RD FL +899'-5" TOS
C
ACCESS DOORS 24" X 24" FOR MOTOR ACCESS AT SIDE & BACK
PT-1 10'-0"
F V
JAMB TRACK FOR OCS-1
CTF-1
EJ-3A
SS-1
ELEVATOR LOBBY
FS
15C9
13
SCALE: 1 1/2" = 1'-0"
EXP.JT.SECTION DETAIL @ ER / NAB INTERFACE 2ND FLR SCALE: 1 1/2" = 1'-0"
7
FOW
KRESGE BENCH @ LEVEL 01
FOW
1 3/4" 3" 1 3/4"
18
SCALE: 1 1/2" =
R1
SS-1 8'-0"
CTC-1 KRLB GROUND FL. E 8'-0" +874'-10 1/2" TOS SS-1 8'-0"
NAB 3RD FL +904'-10" TOS
13 A-560
SS-1 8'-0" CTC-1 8'-0"
SS-1 8'-0"
3"
14'-7"
EXP.JT. W/ EXIST
LOBBY
15C7
3 A-360
8
SCALE: 1 1/2" = 1'-0"
STUD BASED TO SLAB ABOVE (PROVIDE FIREPROOFING)
ATRIUM CORRIDOR
C-K
4 A-360
8.2-ER
CLG. AS SCHD.
6" AXIOM TRIM
SECOND FLOOR RCP - NORTH ER ELEVATOR 1/4"
7
CLG. AS SCHD.
TRACK ASSEMBLY
EXTEND OVERHEAD
ER ELEVATOR PIT +850'-10" TOS
ALL EXPOSED INSIDE SURFACES TO BE PAINTED BLACK, TYP
1/2" DIA. THREADED RODS WITH NUTS & WASHERS. 12" FROM EACH END AND SPACED 2'-0" MAX IN THE OPENING
KRLB B.O. SOFFIT +887'-3 1/2"
BRACE AS REQUIRED
HSPS T.O. +914'-7 3/4
BRACE TO SLAB @ 16" O.C.
EXP.JT.S W/ EXIST
SCALE: 1 1/2" =
KRBL BUILDING
16 A-560 NAB 2ND FL +890'-10" TOS
EJ-1FA
7.1-ER
3"
8-ER
EJ-1FA
8.2-ER
3"
SILL AS SCHEDULED
FIRST FLOOR RCP - NORTH ER ELEVATOR
NEW TOPPING SLAB @ KRESGE W/ EXTRUDED POLYSTYRENE FILL
2"
NAB 2ND FL +890'-10" TOS
SCALE: 1/4" = 1'-0" 1"
6
4"
NAB 2ND FL +890'-10" TOS
1"
ER 2ND FL +890'-9" TOS
NAB BUI
LINE OF FIN FLOOR SHOWN DASHED (CARPET)
8"
ER LOW ROOF +885'-1" TOS
17
EXPANSION JOINT DETAIL @ ER ELEV
12
SCALE: 1 1/2" = 1'-0"
EXP.JT.SECTIONDETAIL @ ER / NAB INTERFACE 2ND FLR SCALE: 1 1/2" = 1'-0"
2'-0 1/2"
FOW
11 A-560
2'-8 1/4"
EXSIT CMU SHOWN HATCHED
2.9
2.7
13 A-571
3 EQ. R = 1'-5"
PT-1 16'-6 3/8"
NAB 1ST FL +873'-4" TOS
NAB LOWER FL +855'-10" TOS
ENLARGED SECTION DETAILS - INTERIOR EXPANSION JOINTS C:\KPF\Revit\2139_ARCH_KPF_MAIN_mlabrake.rvt
10 EQ R = 5'-7"
ER B1 FL +861'-5" TOS
INSIDE GUIDE ANGLE
PT-1 15'-1 1/2"
JAMB TRACK FOR OCS-1
CEILING AS SCHEDULED SS-1
F V R1
AF2
AF2
R1
EXISTING KRESGE SLAB SHOWN HATCHED
R4
EJ-3A P5 F 05E5 S SS-1 7'-1"
R4
05E5
SEE STRUCTURE DRWAWINGS FOR LINTEL / SUPPORT INFO
OCS
ACT-5 9'-0"
HINGED CEILING PANEL FOR DOOR ACCESS
R1
R4
CTW-1
ELEV RM
NC
FS
FS
NC
0591
STORAGE
LIGHT FIXTURE ATTACHED TO NAB STRUCT W/ STUD FRAMED
0600A
ELEVATOR LOBBY
OCS SS-1
ER LOW ROOF +885'-1" TOS
PT-1 9'-0"
7"
P5
R4
FIR
0597
SS-1 7'-1"
FS
SS-1
FURN. STOR.
BRACED CEILING FRAME TO CMU WALL
SS-1 7'-1" CTC-1 7'-1"
R1
A-560 4/2/2015 4:30:16 PM
ENLARGED CORE PLANS - ER NORTH STAIR C:\KPF\Revit\2139_ARCH_KPF_MAIN_swpark.rvt A-406 4/2/2015 3:54:27 PM
12 A-571
05C9 2 7/8"
3"
7"
1'-2 3/8"
EJ-3A SS-1
10"
16
HEAD / SECTION DETAIL @ER ELEV
11
SCALE: 1 1/2" = 1'-0"
Expansion Joint and Fire S hutter Section Detail SCALE: 1/4" = 1'-0"
ATRIUM CORRIDOR 05C7
CTC-1 12'-9" SS-1 7'-1" ACT-5 12'-9"
2
KNIFE EDGE
WD-6
SS-1 7'-1"
ACCESSIBLE CEILING AS SCHEDULED
SECTION @ NORTH ER ELEVATOR
PT-1 14'-6"
ELEV P5 SHAFT
ER 1ST FL +874'-9" TOS
11 A-560 SIM
9
2.2 ACT-1 13'-8"
5
10"
HEAD / SECTION DETAIL @ ER / NAB INTERFACE
7.1-ER
8-ER
8.2-ER
LOWER LEVEL RCP - NORTH ER ELEVATOR SCALE: 1/4" = 1'-0"
6
SCALE: 1 1/2" = 1'-0"
Sangwook Park 31
EXP. JT. SECTION DETAIL @ 4TH F 45C6 INTERFACE W/ KRESGE SCALE: 3" = 1'-0"
design: opt 2
rogress
City Point
Professional Works | KPF Program : Residential Tower Location : Fullton Street, Brooklyn, NY Client : EXTEL Architect of Record : SLCEArchitects,LLP Design Architect : KPF Project Team : Robert White ( Design Principal ), Bruce Fischer ( Director ) Project Year: 2015 ~ Total Area : 600,000 sf Publication : Brooklyn’s tallest tower featuring a sculptural facade, Designboom (10.03.2017) Rising 68 stories to 720 feet, Extell Development Company’s first tower in the borough marks is the final phase of Downtown Brooklyn’s City Point. Brooklyn Point will complement the character and quality of the previous City Point buildings - made possible by the rezoning of this special mixed use district. KPF is celebrated for its supertall architecture, such as the recently completed 555-meter-Lotte World Tower, South Korea’s tallest building, One Bayfront Plaza, set to be Miami’s joint-tallest building, and closer to home in New York, One Vanderbilt will overtake 432 Park as the second tallest building in the city. The tower’s façade features stacked frames that create sculptural relief accented by an interplay of light and shadow. The custom curtain wall’s double-height frames accentuate the verticality of the building and the facetted planes add depth and texture to the exterior. Designed as two folded sheets, the façade features reveals at the northeast and southwest corners and the crown angles up to a point thereby bestowing the building with an iconic profile.
Exterior Wall View A flatbush street facade design
Exterior Wall View B
gold street facade design
architecture louvers DECORATIVE louvers
terracotta fins
metal frame
low iron glass
terracotta panels
terracotta panels
low iron glass low iron glass
DETAIL PLAN ON FL 04
RETAIL louver band
retail louver band
jet mist stone
WEATHERPROOF LOUVER 10’ BEHIND ENCLOSURE LINE
AIR PLENEUM
terracotta piers
- 11 -
DECORATIVE LOUVER 75% OPEN
Podium Wall Type A in progress
32 Sangwook Park
jet mist stone base
11-18-2015 CITY POINT PHASE III - 6 -
Podium Wall Type B in progress
GOLD STREET FACADE
jet mist stone base
11-18-2015 CITY POINT PHASE III
- 16 -
Podium Wall Type C
11-18-2015 CITY POINT PHASE III
Sangwook Park 33
Partial Section
Partial Elevation
Detail Section
Partial Plan
IN - PROGRESS
IN - PROGRESS
awning operable window
nw corner living room/kitchen interior view
6’-9” wide window: typical bedroom interior view
6’-9” WIDE WINDOW: Typical living room interior view
TYP Bedroom
North West Corner Living Room
Interior Perspective at nw corner living room
- 11 -
34 Sangwook Park
ne corner living room/kitchen interior view
North East Corner Living Room
Interior Perspective at ne corner living room 11-25-2015 CITY POINT PHASE III
+ 8’-4” A.F.F. window head Height
awning operable
+ 2’-11” A.F.F. transom
- 12 -
11-25-2015 CITY POINT PHASE III
IN - PROGRESS
36”
34” 25”
OPTION A
OPTION C
OPTION B Edge Frame Study
Interior Perspective
The mixed-use tower will features 458 studio to 3-bedroom luxury residences with custom interiors and retail at its base. Over 40,000 square feet of services and lifestyle amenities at Brooklyn Point include abundant entertainment areas and unrivaled outdoor amenities. 10-21-2015 -9Located at 1 City Point (aka 138 Willoughby Street), residents will have internal access to City Point Tower, the home of DeKalb Market, Target and Alamo DraftHouse Cinema.
CITY POINT PHASE III
corner of willoughby and flatbush
in progress
-9-
11-18-2015 CITY POINT PHASE III
Sangwook Park 35
Hambrug Science Center
Professional Works | OMA
Program : Science Center, Aquarium, Office Theatre in HafenCity, Hambrug, Germany Client : HafenCity Hambrug GmbH Project Team : Rem Koolhaas, Marc Paulin, Mark Balzar, David Brown, Joao Ruivo Design Completion Year : 2007 Project Area :23,000 sm
The complex, comprising of the Science Center, Aquarium and Science Theatre, is located at the entrance to the Magdeburger harbour and sits at the end point of an urban axis from the inner Alster to the river Elbe. Situated at the waterfront in close proximity to container and cruise ships, the building marks the connection between the harbour and the city. The Science Center will become a hub Public for scientific study in Hamburg and help strengthen the city’s educational profile creating a place for the next generation of scientists Circulation Sequence to study and share knowledge. Not only will the Science Centre be linked to many other institutes in Hamburg but it will also become the generating force for innovative education and be a cultural highlight in itself. The Science Centre is constructed of 10 modular blocks that connect to form a ring shaped building. This shape and the maritime power and mass of the individual blocks resemble the character of the historical, urban waterfront development..Therefore, the building is a symbol of Hamburg’s economic strength and a representation of the city’s interest in technology and science. The exhibiton space also works on a modular principle similar to the building. This gives the curators of the space a great deal of freedom and flexibility. A variety of subjects will be able to go on display making the exhibiton centre a stage for not only scientific research but also for all aspects of our modern life. OMA.
VO LUME
NO :1 .
/
REVIS IO N
NO :5
***
R O TTER D A M ,
TU ES D A Y ,
S EP 1 8 2 0 0 7
Location file: Projects on (ro-file) Q, Hamburg Presentation, InDesign, 070918 End Presentation e.indd
PA GE
27
FUSSGÄNGER
“...the visitor is not forced to walk a predefined route to understand the exhibition. He can focus on the topics he is interested in. The Science Center does not tell a coherent linear story, but encourages the visitor to choose different ways to approach themes. Electronic guidance systems enable this indvidual orientation...”
ÜBERSEEALLEE
NEW ORLEANS STRASSE
+ 5.4 m
+ 35.0 m
+ 69.0 m
+ 52.0 m
+ 23.0 BELLE ETAGE
+ 6.0 m
+ 8.5 m
+ 6.0
O M A.
VO LUME
NO :1.
/
REVISIO N
NO :5
***
R OT T E R D A M ,
TUESDAY,
SEP 18 2007
Location file: P rojects on (ro-file) Q , H amburg Presentation, InDesign, 070918 End Presentation e.indd
PAG E
25
Structur
Necessary staircase 3+3 Elevators
ÜBERSEEPLATZ
CHICAGOKAI + 8.1 m
+ 6.5 m
Assembling
Diagram
KREUZFAHRTSCHIFFE
TECHNICAL
BASE CAMP ADDITIONAL PROGRAM
TEMPORARY EXHIBITION 3
ADDITIONAL PROGRAM
Necessary staircase 3+3 Elevators 2 structural walls
TEMPORARY EXHIBITION 2
EXHIBITION TEMPORARY EXHIBITION 1 EXHIBITION
TECHNICAL / STORAGE
PUBLIC
RESTAURANT
BELLE ETAGE EXHIBITION
FOYER
EXHIBITION
SCIENCE THEATER
PASSAGE
AQUARIUM
2 structural walls 7m distance
STRUCTURAL RING
Bracing Walls
070704-structure_diagram2.AI
Structure Concept Diagram
structural ring
building outlline
36 Sangwook Park
bracing walls
PROGRAM CIRCULATION
Circulation Diagram
O MA.
VO L U M E
NO:1.
/
REVISION
***
NO:5
RO T T E RDAM,
T UE S DAY,
S E P 18 2007
PAGE
Location file: Projects on (ro-file) Q, Hamburg Presentation, InDesign, 070918 End Presentation e.indd
4
VOLU ME
Ring von Hamburg
N O:1 .
Kreislauf statt Sackgasse
OMA.
Public plus Private
/ R EV I SI ON N O:5
ROOF
/
REVI SI ON
NO:5
***
ROT T E R D A M,
TUESDAY,
SEP 18 2007
L o c a t i o n f i l e : P r o j e c t s o n ( r o - f i l e ) Q, Ha mb u rg Presentation, InDesign, 070918 End Presentation e.indd
PA G E
22
ROOF
PRIVATE PRIVATE FLOOR 14
FLOOR 14
FLOOR 13
FLOOR 13
FLOOR 12
FLOOR 11
FLOOR 10
FLOOR 9
FLOOR 8
TE IVA
FLOOR 7
m2
FLOOR 5
m2
FLOOR 7
T UE SDAY,
FLOOR 6
FLOOR 8
FLOOR 6
PUBLICPUBLIC
m2
FLOOR 9
PR
m2
ROT T E RDAM,
FLOOR 12
FLOOR 11
FLOOR 10
TE IVA
NO:1 .
PR
VOLUME
***
O MA.
ADMINISTRATION FLOOR 5
ADMINISTRATION FLOOR 4
FLOOR 4
TEMP. EXHIBITION 2 FLOOR 3
FLOOR 3
SE P 18 2007
FLOOR 2
FLOOR 2
TEMP. EXHIBITION 1 FLOOR 1
PUBLICPUBLIC
FLOOR 0
FLOOR 1
+8.50m Hochwasser +7.50m
FLOOR -1
+5.50m
FLOOR 0
+8.50m Hochwasser +7.50m
FLOOR -1
+5.50m
+1.00m 0.00m
Section FF’
North - South Section
Sangwook Park 37
41
Concept Model
The Science Center addresses not only environmental issues but also programmatic sustainability. The function of the ten blocks that make up the building allow for large scale programmatic changes on a daily basis. The central structure accommodates the vertical circulation whereas the blocks on the west and east side are used as exhibition spaces. The curator is able to generate shortcuts, changes or create connections by means of moveable partitions. With three terraces surrounding the building the Science Centre allows access to the Hamburg city centre as well as to the West and East sides of the Magdeburg harbour. This three way axis will link the various parts of the city and bring new life into the Hafencity. It enables direct interaction between visitors and passers-by functioning as an urban stage. Various events taking place on top of the individual plateaus of the building as well as the restaurants on the terrace of the Belle Etage will stimulate activity in the Hafencity.
PAGE
B+E
Section
Longitudinal & Cross
Final Diagram 3d
Location file: Projects on (ro-file) Q, Hamburg Presentation, InDesign, 070918 End Presentation e.indd
East - West Section
Section CC’
+1.00m 0.00m
ADMINISTRATION
ADMINISTRATION
TEMP. EXHIBITION 2
TEMP. EXHIBITION 1
M 38 Sangwook Park
1. BWI_Baltimore Washington International Airport 2. National Holdings Headquater, Abu Dhabi 3. PS 315, Queens 4. Dogok Villa, Seoul Sangwook Park 39
Baltimore Washington International Airport Professional Works | SOM
Program : BWI Marshall Airport Terminal C Renovation Location : Baltimore, Maryland Project Team : Roger Duffy(Partner), Laura Ettelman(Director), Themis Haralobides(Associate) Project Year : 2011~2013(Completion) Project Area : 16,800 sm
One important part of the passenger experience occurs as security checkpoints, and the need to upgrade them is currently a common thread at many airports, says Ettelman. The new screening area at BWI includes marked improvements for passengers and staff alike. The previous C Concourse checkpoint was moved to a substantially larger location, between concourses B and C. It now boasts nine wider lanes, better lighting and a welcome view of the airfield. The improvements an important undertaking with more lanes, the checkpoint process proves to be much better for passengers than it used to be. This enables flexibility for the airport long-term and accommodates the growth of airline. The new open space created with the checkpoint dovetailed with the need to widen BWI’s C Concourse to comply with changes in egress codes - just one of the legacy issues the airport had to face.
40 Sangwook Park
The idea of having airside connections between concourses has become an important feature in airports. BWI opened its B/C Connector in April, when its new security checkpoint went live. This connection offers an open path for passengers between the 14 gates in Concourse C and the 26 gates in A and B, It also provides a vital precursor for future growth. There are two additional gates in the C Concourse which are leased by airline, so this was important from a business perspective. The new connector also allowed for additional food/beverage and retail space, enabling the airport to increase its offerings for passengers.
Sangwook Park 41
EXISTING TO REMAIN
EXISTING TO REMAIN
EXISTING TO REMAIN 7 AA’
4
5
3
2 4
5
1
11
9
6
20
10 8
10
DN
18
16
12 10
14 15
13 OUTLINE OF ROOF ABOVE
17
13
EXPANSION JOINT
22
21
’ F-F E-E’
LEGEND 1. Concessions (Silver Diner) 2. Corridor
3. Storage 4. Communications 5. Electrical Room 6. TSA Support Space 7. SSCP 8. B-C Connector 9. Concessions (Exist.) 10. Egress Stair
UPPER LEVEL PLAN
N
0
25
50
100’
11. Airline Club 12. Egress Stair (Exist.) 13. Service Elevator 14. Concessions 15. Concessions (Restaurant w/ Bar) 16. Concessions (News & Gift) 17. Concessions (Coffee / Cafe) 18. Concessions (Relocated) 19. Concessions (Exist. to be Reconfigured) 20. Gate C1 Holdroom 21. Gate C2 Holdroom 22. Gate C3 Holdroom
19
5 EXISTING TO REMAIN
EXISTING TO REMAIN 12
17
12
1 1
17
3
2
5
6
5 17
AA’
13
15
13
10
6 10
7 9
14
16
11 10
5 17
8
11
OUTLINE OF ROOF ABOVE
4 8
E-E’ ’ F-F
LEGEND
N
LOWER LEVEL PLAN 0
12 Sangwook Park
42 Sangwook Park
25
50
100’
1. Chimes Room (Exist.) 2. MAA Electric Room (Exist.) 3. Main Paging Room (Exist.) 4. Generator 5. Electrical Room 6. Mechanical Room 7. Emergency Electrical 8. Trash Compactor
9. Egress Stair (Exist.) 10. Egress Stair 11. Loading Dock 12. Baggage Claim (Exist.) 13. Future Outbound Baggage 14. AA Outbound Baggage 15. TSA Baggage Screening 16. Electrical Substation 17. Communications Room
EXISTING TO REMAIN 1
AA’
2 5
3
4 8
6 7
OPEN TO BELOW
9
10 11
14
12 13
OPEN TO BELOW 15
OUTLINE OF ROOF ABOVE
E-E’ ’ F-F
LEGEND
N
MEZZANINE LEVEL PLAN 0
25
50
100’
1. Existing Roof 2. Mens Room 3. Womens Room 4. Storage 5. Janitor Closet 6. Electrical Room 7. Observation Gallery 8. Display (Reconfigured)
9. Roof Access 10. Access Corridor 11. Egress Corridor 12. Dumbwaiter 13. Egress Stair 14. Offices (Exist.) 15. Connector Roof
BWI Airport_SOM 13
Sangwook Park 43
National Holdings Headquater Professional Works | SOM
Program : NHHQ Office Tower in Abu Dhabi, UAE Client : National Holdings Project Team : Colin Koop( Associate Director ), Jongwon Lee Project Year : 2011 - Winning Project at Competition Phase Project Area : 4,400 sm
44 Sangwook Park
Entrance
Lobby KEY PLAN KEY PLAN
DROP OFF / PARKING ZONE
A-202
A-202
P03
P02 T10
T5
T11
T10
9000
C2
C1 NOTE
8828
909 0
550 5
31.39°
PROPERTY LINE
P06
T8 17828
T5
C1
T9
1
T7
T6
T11
20.92° 358 5
P06
7° 62.7
7° 62.7
T4
T4
OPEN TO BELOW AREAWAY
SETBACK LINE
47° 10. 31.39°
1 A-252
T12
STAIR #4
T12
31 .39 °
OPEN TO BELOW AREAWAY
3585
1 A-252
T3
FOUNTAIN WITH SIGNAGE
RETAIL SHOWROOM
UP
T14
THESE DOCUMENTS INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPT, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS AND THE TYPE OF MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL SYSTEMS. AS SCOPE DOCUMENT THEY DO NOT NECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE WORK THE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.
PG
2
A-201
TEL
178 28
SIKKA
DN
T2
SECURITY ELEC
PE1
PE1
PF
VIP1
DN UP
RETAIL
T/ SLAB EL. + 102.9
PE2
PE4
PE UP
T16
DESCRIPTION
DATE
CHECKED
UP
FR1
SKIDMORE, OWINGS & MERRILL LLP 14 Wall Street New York, New York 10005
5505
9090
ABU DHABI - SECTOR W59/01 PLOT : C03
PA
1
31.39°
47° 10.
7° 62.7
RECEPTION31/.39°RETAIL FLOOR C2 PLAN - GROUND SCALE
358 5
7° 10.4
1 : 100
P04
P03
SHEET :
M
NORTH POINT
909 0
DRAWING TITLE
OFFICE FLOOR PLAN -LEVELS 05, 07, 09, 11 & 13
C1
550 5
P06
8828
OF :
P02
13 APR 12
T22
Ground Floor Plan
1
OFFICE LEVEL 05 - TYPICAL LEVELS 07, 09, 11 & 13 1 : 100
T21
SCALE
1 : 100
A-105
DRAWING NUMBER
31.39°
T19
9000
SHEET :
NORTH POINT
17828
FOR MUNICIPALITY APPROVAL
4/23/2012 9:59:53 AM
4/23/2012 9:59:33 AM
T18
7° 62.7 DATE
A-100
20.92°
T19 1
1 : 100
3 BASEMENT + GROUND + 2 PARKING + 14 TYPICAL OFFICE(INCLUDE VIP)FLOORS + ROOF
ACCESS ROAD 1
13 APR 12
DRAWING NUMBER
A-201 -
GROUND LEVEL FLOOR PLAN
ABU DHABI - SECTOR W59/01 PLOT : C03
PROJECT DESCRIPTION
PARKING ENTRY / EXIT
1
NATIONAL HOLDING HEADQUARTERS
KEY PLAN
A-251 3 BASEMENT + GROUND + 2 PARKING + 14 TYPICAL OFFICE(INCLUDE VIP)FLOORS + ROOF
DRAWING TITLE
512 Seventh Ave New York, NY 10018
PROJECT NAME AND LOCATION
20. 92°
NATIONAL HOLDING HEADQUARTERS
PROJECT DESCRIPTION
IN
DATE
T20
P.O. Box 7497 Dubai, United Arab Emirates
OPEN TO BELOW
31 .39 °
16.66% UP TO LEVEL 1 8.33% UP TO 01
OPEN TO BELOW AREAWAY
PARKING ENTRY RAMPS
T18
T21
T17
512 Seventh Ave New York, NY 10018
PROJECT NAME AND LOCATION
OUT
IN
C1 P06
LOCAL CONSULTANT
UP
1 A-251
C2
APPROVED
DN
P.O. Box 7497 Dubai, United Arab Emirates
PB
3585
6000
OUT
IN / OUT
CHECKED
SKIDMORE, OWINGS & MERRILL LLP 14 Wall Street New York, New York 10005 OFFICE
LOCAL CONSULTANT
OPEN TO BELOW AREAWAY
UP
DATE
NATIONAL HOLDING P.O. Box 111966, Abu Dhabi United Arab Emirates PRINCIPAL CONSULTANT
STAIR #2
T17
STAIR #2
DESCRIPTION
OWNER NAME
T16
MECHANICAL
PRINCIPAL CONSULTANT
ELECTRICAL MECH ROOM
OPEN TO ABOVE & BELOW AREAWAY
REV . NO.
A-203
NATIONAL HOLDING P.O. Box 111966, Abu Dhabi United Arab Emirates
PD PC
SERVICE ELEV. LOBBY STAIR #5
SET PROGRESS 04/13/12 CTION CONSTRU
NOT FOR
DN
1
APPROVED
OWNER NAME
8.33% DN TO B1
A-203
Receiving
T22
PE2 STAIR #1
REV . NO.
178 28
PARK3
FR1
GENERATOR ROOM
A-202
T15
T.O. SLAB EL. 123.73
DN
ARRIVAL LOBBY 1
SHOWROOM
2
VIP2 PE3
MECHANICAL
882 8
STAIR #1
PARK2
SET PROGRESS T1 04/13/12 CTION CONSTRU NOT FOR
900 0
FIRE COMMAND CENTER
PE4
F. FLR. EL. 123.8
T15
PE3
PARK1
UP
VIP2 16.66% DN TO B1
ELEVATOR LOBBY
VIP1
STAIR #3
A-202
882 8
2
FIN. FLOOR
DN
THESE DOCUMENTS INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPT, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS AND THE TYPE OF MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL SYSTEMS. AS SCOPE DOCUMENT THEY DO NOT NECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE WORK THE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.
STAIR #4
2
STAIR #6
STAIR #3
DN
OFFICE
T14
DROP OFF AREA
T2
5500
INCOMING ELEC. SERVICE EQUIP.
T13 OPEN TO BELOW
RETAIL SHOWROOM
900 0
T3
9085
ENTRY VESTIBULE
ENTRY PAVILLION
20. 92°
T13
UP
T1
NOTE
C2
31 .39 °
7° 10.4
A-201
ACCESS ROAD 1
P04
T8
ACCESS ROAD 1
T9
1
T7
T6
OF :
T20
1
FOR MUNICIPALITY APPROVAL
A-201
4F~16 Floor Plan
NOTE
T12
T.O. CENTER CORE 189.500 m
7000
7000
T.O. CENTER CORE 189.500 m
UPPER ROOF 185.900 m
UPPER ROOF 185.900 m T.O. CROWN 182.500 m
12425
12425
T.O. CROWN 182.500 m
TOP OF WATER STORAGE 175.845 m
TOP OF WATER STORAGE 175.845 m
5025
LOWER ROOF 170.075 m
5025
LOWER ROOF 170.075 m
3750
LEVEL 16 165.050 m
3750
LEVEL 16 165.050 m
3750
LEVEL 15 161.300 m
3750
LEVEL 15 161.300 m
3750 3750
LEVEL 12 150.050 m
3750
LEVEL 12 150.050 m
95900
LEVEL 10 142.550 m 3750
3750
95900
3750
LEVEL 11 146.300 m
3750
LEVEL 11 146.300 m
LEVEL 10 142.550 m REV . NO.
DESCRIPTION
DATE
CHECKED
LEVEL 08 135.050 m
NATIONAL HOLDING P.O. Box 111966, Abu Dhabi United Arab Emirates
3750
3750
LEVEL 08 135.050 m
PRINCIPAL CONSULTANT
3750
LEVEL 07 131.300 m
3750
LEVEL 07 131.300 m
LEVEL 06 127.550 m
SKIDMORE, OWINGS & MERRILL LLP 14 Wall Street New York, New York 10005
3750
3750
LEVEL 06 127.550 m
LOCAL CONSULTANT
3750
LEVEL 05 123.800 m
3750
LEVEL 05 123.800 m
4750
LEVEL 04 120.050 m
4750
LEVEL 04 120.050 m
P.O. Box 7497 Dubai, United Arab Emirates
NATIONAL HOLDING HEADQUARTERS
12400
3100
LEVEL 02 110.700 m LEVEL 01 107.600 m
4700
LEVEL 01 107.600 m
4700
12400
LEVEL 02 110.700 m
GROUND FLOOR 102.900 m
ABU DHABI - SECTOR W59/01 PLOT : C03 PROJECT DESCRIPTION
3 BASEMENT + GROUND + 2 PARKING + 14 TYPICAL OFFICE(INCLUDE VIP)FLOORS + ROOF
3100
3100
GROUND FLOOR 102.900 m
512 Seventh Ave New York, NY 10018
PROJECT NAME AND LOCATION
4600
LEVEL 03 115.300 m
4600
LEVEL 03 115.300 m
9300
DRAWING TITLE
OVERALL BUILDING ELEVATIONS - SOUTH & WEST
3100
LEVEL B2 96.700 m
3100
LEVEL B2 96.700 m
9300
LEVEL B1 99.800 m 3100
LEVEL B1 99.800 m
LEVEL B3 93.600 m
DATE
LEVEL B3 93.600 m
South Elevation
West Elevation
DRAWING NUMBER
NORTH POINT
13 APR 12
SCALE
A-201 SHEET : OF :
4/23/2012 10:00:40 AM
Sangwook Park 45 1
SOUTH ELEVATION 1 : 200
APPROVED
OWNER NAME
3750
LEVEL 09 138.800 m
3750
LEVEL 09 138.800 m
3100
SET PROGRESS 04/13/12 TION CONSTRUC R FO T NO
LEVEL 13 153.800 m
74200
LEVEL 13 153.800 m
74200
3750
3750
LEVEL 14 157.550 m
3750
LEVEL 14 157.550 m
3100
THESE DOCUMENTS INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPT, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS AND THE TYPE OF MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL SYSTEMS. AS SCOPE DOCUMENT THEY DO NOT NECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE WORK THE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.
2
WEST ELEVATION 1 : 200
FOR MUNICIPALITY APPROVAL
1 : 200
PS 315Q
Professional Works | SOM Program : PS 315Q Elementry School Client : School Construction Authority Location : Queens, NY Project Team : Adam Semel( Associate ), Ben Porto Project Completion Year : 2011~ 2015 (Completion) Project Area : 131,000 sf Publication : New York Times (04.46.2013)
Main Entrance View
Aerial View
46 Sangwook Park
Skip-Stop Floor Section Diagram
Library / Lobby / Courtyard Corridor / Gymnatorium
Logitudinal Section
Longitudinal Section 96-18 43rd Avenue , Queens| February 8, 2011
Copyright © Skidmore Owings & Merrill LLP 2011
North South - through Lobby/ Stairatorium/ Library 96-18 43rd Avenue , Queens| January 07, 2011
Sangwook Park 47 Owings & Merrill LLP 20 Copyright © Skidmore
Dogok Villa
Professional Works | arktonic Program : Residential Client : Otium Location : Dogok-dong, Seoul, Korea Project Team : Chongwoo Shin, Jin soo Baek Project Year : 2012~2015 Project Area : 9,703 sm Architects of Record : GNI Architects.
Front View
Living Room
48 Sangwook Park
Dinning Room
Kitchen
Rear View
Roof View
Roof Top View
Sangwook Park 49
S 50 Sangwook Park
1. Garage Coffee , Gahoedong,Seoul 2. Pilates The Fit, Dogokdong Seoul 3. Ask Alice Shoes Showroom, New York 4.Communication on Color, San Antonio 5. Touch Space, Seoul Foundation Arts and Culture 6. Conpen Cycle Sangwook Park 51
Garage Coffee
Professional Works | arktonic Program : Restaurant in Gahoe-dong, Seoul Project Team : Jin Soo Baek Project Completion Year : 2012 Design Completion Year : 2012 Project Area : 451 sm
garden
The range of the project is commercial rehabilitation of garage of 30 years old house in the historic preservation zone. It is located entrance of Bukchon Hanok Village, Korean traditional village in Seoul. There was coulple of factors which defines range of the project. The first is requirement by zoning code, which limits exterior appearance such as color or material. The second is change program from garage to café. Client want to keep garage image. Folding door allows multiple use over open deck and close. When it is closed, the garage becomes car-exhibition space. If it is opened, it is merges the café interior space. In addition, existing ceiling height is too low because it was originally designed as garage for three cars. However, the low-ceiling height is not good condition as café. Interactive lighting is applied for the lower ceiling in order to make people experience the condition as interesting phenomenon rather than inconvenience. interactive lighting
mesh metal
garage
cafe
exploded axon diagram
garage door view
52 Sangwook Park
Interactive Lighting on Ceiling ansd Wall
garage
Korean Traditional Wall on the deck
Sangwook Park 53
front view
mulltiple use for parking lot opened folding door
roof top garden with Korean taditional wall finishdetail (night)
view from roof top garden toward book chon, historic area of seoul
54 Sangwook Park
basement floor plan
scale 1:200
roof top garden floor plan
scale 1:200
section
scale 1:100
Sangwook Park 55
Pilates The Fit
Professional Works | arktonic Program : Pilates Studio Inetrior Project Team : Jin Soo Baek Project Completion Year : 2012 Design Completion Year : 2012 Project Area : 60 sm
56 Sangwook Park
Studio
Materials layout is the range of the project exploration. Client wants dark brown hardwood flooring for comfortable environment as Pilates studio. I extended the material use to wall and ceiling finish. It creates white zone such as studio, office or locker room and wood zones such as corridor, like inside and outside of coconut surface. Material schedule was important issue in this project, because it was very low budget project. It was important to balance among finishing materials reflecting the concept well in limited budget. I used three types of wood finish; walnut and rosewood hardwood flooring and wenge laminate film. I used walnut hardwood flooring, more expensive and higher qualified with thick wood layer for floor finish and rosewood hardwood flooring, cheaper and thin wood layer for wall and ceiling and wenge laminate film for bench cabinet of window side. Another journey from material arrangement was corner detail between two different materials and between two different sides such as wall and ceiling. Built-in furniture for storage is arranged on window side for spatial efficiency, providing depth for view frame as well as seating area.
Sangwook Park 57
shoe shelve
drawer type storage under window bench
bathroom
locker room
office
studio
Floor plan
58 Sangwook Park
scale 1:150
Reflective ceiling plan
scale 1:150
locker room
laminate film wenge 26.4 sm
hardwood flooring walnut 61sm
laminate film wenge /hairline aluminum /wood flooring(walnut)
hardwood flooring walnut/ mirror glass hardwood flooring rosewoodt 26.4 sm
hardwood flooring rosewood /hardwood flooring(walnut)
hardwood flooring rosewood (corner)
hardwood flooring rosewood( door gap)
Sangwook Park 59
Ask Alice Showroom Professional Works | arktonic
Program : Showroom and Office Interior at 5th Ave, New York, NY Project Completion : 2012 Design Completion Year : 2012 Project Area : 2,000 sf The range of the project exploration is defined by women’s shoes. The program was showroom for the designer’s shoes. I encounter photographer who came into the office for taking picture of shoes for New York fashion week, and his background paper roll inspired me some idea about display. It shows the way to make their product more visible on itself by infinite effect of rounded edge. I was trying to make the display shelves as background like paper roll in order to focus on their product easily. Fillet edge and frost glass shelves is the achievement through exploring range of the concept. In addition, window bench, which is finished by dark brown wenge laminate film, creates view frame toward 5th avenue of New York as symbol of fashion industry. It provides some break time admire the scenery of the street with deep depth 24 inch. In addition, it could be the seat for watching fitting model for testing shoes as well as display area. Entrance corridor is designed as linear space and the interactive lighting with motion sensor provides metaphor of runway walking.
froast glass
60 Sangwook Park
lighting
wood bench
rounding
mirror
floor plan
showroom meeting table
scale 1/16” = 1’
office
bench frame with at window frame
Sangwook Park 61
dispaly zone A & B
display zone C
62 Sangwook Park
entrance
display shelves : froast glass and rounding off an edge
display shelves section and elevation
round effect con-
Sangwook Park 63
Communication on Color
Professional Works | arktonic
Program : Interactive lighting at Hotel lobby Location : Sheraton Gunter Hotel, San Antonio, TX Client : Sheraton Gunter Hotel Project Year: 2013~ 2014 (Completed) Publication : Communication on Color in Sheraton Gunter Hotel, Design Boom (02.19.2014) Interactive Lighting at Sheraton Gunter Hotel, Sztuka Wnetza ( 03.18.2014)
DATA COLLECTING
SENSORS & DEVICE
PROGRAMED LIGHT
SITE
The interactive lighting installation ‘communication on color’ by architecture studio arktonic features in the lobby of the sheraton gunter hotel in san antonio, texas, america. wrapping around four existing columns, the design is part of a renovation project to the historic building. the original structure was built in 1837 and its main lobby is used as a public passage – it runs adjacent to the river walk and is directly across the road from the majestic theater. The interactive system consists of four input devices, a color detector, motion sensor, sound sensor and wifi – the RGB LED network responds to people’s color, motion and sound and is connected to the web by an arduino wifi shield. building a relationship between the visitor and the space, the installation also collects weather information and social media messages to provide a unique spatial experience of a responsive light show.
64 Sangwook Park
ACTIVITY DIAGRAM
Sangwook Park 65
66 Sangwook Park
Sangwook Park 67
Touch Space
Professional Works | arktonic Program : Media Art Exhibition held by Seoul Foundation for Arts and Culture Location : Seoul Foundation for Arts and Culture Project Year: 2016~ 2017 (Completed) Publication : YTN TV News (10.22.2017)
Touch Space is a project that started to expand spatial perception to a tactile experience that is dominated by visual experience. ‘Space’ is a conceptual term that refers to a vacant part. So touching empathy is in fact a contradictory expression. By filling in an empty portion called a negative space, the mass of the space can be instantiated. Touch Space project is questioning in two point of view. First, what is the meaning of space in the state of being excluded from vision, and how does it perceive space? Without vision, does the concept of space change? Although the sympathy that we closed our eyes does not disappear or change, we will have different ways of perceiving space, and the concept of space according to the cognitive method will also be different from that dominated by visual. Apart from the sounding of the sound to the blind, narrow classrooms and auditoriums may not differ greatly in terms of experience. Therefore, touching space can recognize the shape of space by tactile rather than visual. Second, How do we define materiality of space? Perception of space is not only about volume, but also materiality as texture or atmosphere of the brick, wood and concrete. How will glass transparency, the warmth of the bricks and the coldness of the concrete be perceived to us without vision? The recognition of the space through the touch allows you to feel the body temperature of the real space, more than the abundance of space that light gives. The work of ‘touching space’ has its meaning in a view of reinterpretation of space through tactile cognition. Virtual Reality and Motion Sensor works together with a negative space model of 1:50 scale made by the major material of the space such as glass, terracotta and concrete in oreder to maximize the tactile experience by seeing the reinterpretation of space limited by virtual experience. In terms of VR user interface, the area of physical model, where is touched by hand shows inside of the space with interactive animation responding to touch by motion sensor on VR headset, like peeling of the space.
68 Sangwook Park
SEODAEMOON PRISON, SEOUL
Sangwook Park 69
MIT CHAPEL, BOSTON
70 Sangwook Park
GLASS HOUSE, NEW CANAAN
Sangwook Park 71
Copen Cycle
Research Works | MIT Senseable City Lab Program : City Bike Program Project Team : Christine Outram, Vasilena Vasilev, Ben Waber, Brian Yang Project Year : 2008
Real Time Copenhagen is a 3 year research project by the MIT SENSEable City Lab’s in collaboration with the Municipality of Copenhagen. Within this framework, CopenCycle is a short-term project in the context of a workshop which explores the use of real time technologies to map the flow of people and resources in Copenhagen to better understand urban dynamics in real time. By revealing the pulse of the city, the project aims to show how technology can help individuals and the planning institutions to make more informed decisions about their environment with a special emphasis on the use of public spaces. In the long run, the project seeks to integrate the technologies for more detailed studies of e.g. bicycle movements, services and routes in relation to sustainable urban transportations.
72 Sangwook Park
Sangwook Park 73
A 74 Sangwook Park
1. Architectural Monads, Harvard University GSD 2. Monocoque, Harvard University GSD 3. Mix : Program, Harvard University GSD 4. Jameica Plain Housing ,Harvard University GSD 5. Gwangbok Street Renovation, Competition 6. Pattern : Case in Synthetics Intelligence, Harvard University GSD 7. Memory Columns , Venic Architecture Biennale 8. Steretomic Permutation, Competition 9. Mutant Triangle, Korea University Sangwook Park 75
Architectural Monads
Academic Works | Harvard GSD Thesis Theme : Meaning of Parametric Design in a Bottom-Up Process Study of Konrad Wachsmann’s Experimental Structural Web, 1953 Instructor : Joe Macdonald
76 Sangwook Park
3d printing model of dynamic structure
dynamic structure diagram Part Assembly and Structural Diagram The convenience with zooming in and out the project by the digital tools makes the design process is not necessary only one way as top down. In case of industrial design process such as product design based on mass production, the part design issue as bottom-up approach has advantage of the parallel process of design to manufacturing in a view of the production of replicated objects. Konrad Wachsmann was one of pioneer of mass customization in modern architecture. He invented new structure systems, which are manufactured in factory line and fabricated on site. Design generation and design production are well connected each other as industrial mass production of architectural elements. However, components are distributed just repetitively parallel or linear T_01 changed to nonlinear and asymmetry system in control the part in complexity in a whole. In digital era the repetitive array become in a view of a whole through digital parametric tools like Catia’s powercopy. For example, part design before the digital tool can be T_02 described as physical Monads of Liebniz. Digital Monad as a architectural component is considered as metaphysical elements, of T_04 which include their identical property. Even if there is some request to change size of unit to be fitted to the parts in the relationship between neighbors, the property of itself is not changed. The component design and manufacturing as mass production of identical B_01 T_01 parts is determine the dimension. The parts should be organically related each other in a single whole building system. T_04 B_02 T_03 Especially, Monadology can be discussed about self-replicating system such as patterning. As industrial object, architectural element is repetitive not just flat replication like physical phenotypical repetition but asymmetrical and genotypical organization. T_02 B_04 In addition, it is related to the idea of genetic architecture, which is an extension and transformation of the proportions that define attributes and properties of relationships among monads. In this point, Leibniz’s Mondology can be arguable in the respect that the T_03 B_03 architecture is based on the principle of the conversation of information and the principle of the combinational expansion; It is on the concept of monad as the minimal unit in a lowest hierarchy in replicating system. The information can be transited through indexical B_01architecture, the code is B_02 code like genetic algorithm. For example, in the digital algorithm like rhino script or parameter, which is constrained by formula in CATIA. Therefore, the principle of conversation of information is critical point in the digital design process, which defines identity of organization of monads in terms of design methodology related to architects’ authority as style. B_03 B_04
Sangwook Park 77
Floor Panel
78 Sangwook Park
Sangwook Park 79
Mix : Program
Academic Works | Harvard GSD Fall 2006 Program : Proposal for Art + Science Building of Harvard University Allston Campus Instructor : Timothy Hyde
Art program or public spa by program1 In other word more fixed room which facilities1 Therefore, studio surface and lab in science because required space co to each program1 In addit to the surface can have m
The project is suggestion about Science and Art building of Harvard University which is planed to move from Cambridge to Allston. Main topic is how to mix different two programs in terms of the relationship of the programs, science and art considering the local condition. Gap is not difference but the space where connection can happen with each other program. Abstract gap is between programs by study relationship between science and art and then a physical gap between the programs and urban could be brought. In terms of consideration about how gap works about different two programs, surface intruding into the gaps make interpretation about connection among science and art and urban; Some program doesn’t need to be rigid space and others such as science lab need more fixed room which laboratory facilities can be adjusted. In addition, in terms of urban approach, surface can make a new public space which can be originated from the gaps; through single surface, continuous relation can be generated.
80 Sangwook Park
Sangwook Park 81
Monocoque
Academic Works | Harvard GSD Spring 2008 Program : monocoque frame work in architecture Instructor : Winka Dubbeldam
82 Sangwook Park
The re-writing and innovation of architectural design and its structures requires a revolutionary change in the thinking of how architecture is conceived now. From the notion that a building is a composite of standardized elements such as columns floors and walls, we have to “re-think” a building being composed of mass-customized “generative components”. Prefabrication as pure repetition of standard elements is an outdated mode of operation; mass-customized units are evolving as a series of varying elements, defined by an analysis of specific performance, rather than just structural requirements. Standard repetition has been replaced by custom variation. The components’ intelligence refers more to car- and plane-design than to architectural design, is more system-based than mechanical assembly-based. Prefabrication itself is changing as well: where before it would be described as the industrial manufacturing of the same repetitive element, now units are custom-manufactured in a series of varying elements, specific for its use and in its efficiency. This more organic and systematic way of thinking is new for architects, but common ground for scientists and industrial designers.
Sangwook Park 83
Jamaica Plain Housing
Academic Works | Harvard GSD Spring 2007 Program : Proposal for a high-density multi-family housing located in the suburb of Boston, Jamica Plain Instructor : Kimberly Ackert
Housing project should have argument between public and private. Especially, house is private by itself , but if several family live in same area, in terms of public space, gap between private houses should be considered. The variation of gap which is generated from the massing consisting of the wave units could be happened between each private space. The unit is constitutes of living room and bedroom and intermediate space such as dinning or kitchen or bathroom in order. Basically, these waves would be angled vertically or horizontally at 12ft distance. The constitution of the wave follows the order, of public, intermediate and private space.
84 Sangwook Park
Type A : Loft
Type B : Studio
Type C : 1 Br
Type E : 2 Br Basic Cluster
Type F : 1 Br
Type G : 2 Br
The front part which faces the court yard is occupied as living room and intermediate space is for kitchen, dinning or bathroom. The rear part consists of bedrooms. In terms of aggregation, the gaps between the wave unit provides the public space for circulation of the building scale not an unit scale. Each group consists of 6 units 3 bedroom 2 bedroom and 1 bedroom and loft, live work and studio.
Sangwook Park 85
86 Sangwook Park
Floor Plan ( Level + 31’ 6”)
Floor Plan ( Level + 21’ )
Section
Sangwook Park 87
Gwangbok Street Renovation
Personal Works | Unbuilt Architecture Award from BSA / AIA Program : Urban Street Renovation Site : Gwangbok Street in Busan, Korea Design Completion : 2005 Award : Unbuilt Architecture Award fro, BSA / AIA CISCU 2005 Honorabl Mention Project Team : Sunggoo Yang, Hyungdoo Bae
The re-writing and innovation of architectural design and its structures requires a revolutionary change in the thinking of how architecture is conceived now. From the notion that a building is a composite of standardized elements such as columns floors and walls, we have to “re-think” a building being composed of mass-customized “generative components”. Prefabrication as pure repetition of standard elements is an outdated mode of operation; mass-customized units are evolving as a series of varying elements, defined by an analysis of specific performance, rather than just structural requirements. Standard repetition has been replaced by custom variation. The components’ intelligence refers more to car- and plane-design than to architectural design, is more system-based than mechanical assembly-based. Prefabrication itself is changing as well: where before it would be described as the industrial manufacturing of the same repetitive element, now units are custom-manufactured in a series of varying elements, specific for its use and in its efficiency. This more organic and systematic way of thinking is new for architects, but common ground for scientists and industrial designers.
88 Sangwook Park
Street Elevation
Site Plan / Material Mapping
Street Furniture
Detail Section
Sangwook Park 89
Memory Columns
Personal Works | Venice Architecture Biennale 2008
Program : Exhibition at Venice Architecture Biennale Award : Winning Project Everyville / Venice Architecture Biennale 2008 Theme : Rethinking about identity of satelite city
Memory is relative spatiality. The memory is remembered through index such as special object or place which has been left strongly. These days, the indexes of the city arise and disappear more quickly than before. When I went to my hometown which I lived in my 15 years ago, that has been changed so much that it was really hard to recognize the memorial place in my childhood. My playground is gone. This project suggests the digital column such as the system of coordinates. The X and Y position of the columns are fixed. Even if the structure of the city is changed, the columns can be index which address the memory of the city. For example, the columns in the area, Avenue Y and W street under construction of a new Unified School can accumulate the memory of the place from the construction to school event around there in the future. In addition, afeter 10 years, some building might be disappeared or new street might be constructed. Some place in outdoor may become interior space with new building construction. Through these events of the city can be remembered by the digital columns which would have been same place as 10 years ago. The Digital columns on featureless Everyville’s topography become index to remember memory of the city in the passage of time. Besides, while the columns are presenting natural factors of the city the sound, temperature of wind etc. and interacting with physical index of the city such as traffic or population etc., it is creating new cityscape.
90 Sangwook Park
Sangwook Park 91
Pattern : Case in Synthetics Intellingence Personal Works | Exhibition
Program : Exhibition at Harvard University GSD Theme : Pattern Case in Synthetics Intelligence
92 Sangwook Park
Stereotomic Permutation Personal Works | Competition
Program : UIA Velux International Competition 2006 Award : Honorable Mention/Exhibited in Guggenheim Bilbao , Spain Theme : Light o f Tomorrow
Sangwook Park 93
Mutant Triangle
Academic Works | Korea University Thesis Theme : Urban Structure as Felexible Pre fabricated System Instructor : Young-Ho Yeo, Chanjoong Kim
Korea University 2004 Thesis Project Korea University 2004 Thesis Project If numerical value of panel would be standardized, the cost of installation could be reduced. Fundamentally, triangle has three sides and angles.
If numerical of panel wouldthrough be standardized, of installation beof reduced. Accordingly, 11value triangles is acquired three lengths,the a, cost b, c which constitutecould the side triangle. Fundamentally, triangle has three sides and angles. Accordingly, 11 triangles is acquired through three lengths, a, b, c which constitute the side of triangle. Homogeneous product-mathematics formula, n Hr =n+r-1 Cr-1 Homogeneous H= C H = product-mathematics C = 5 C2 =5*4/2*1 =formula, 10 n r n+r-1 r-1 3 3 3+3-1 3-1 H= C = 5 C2 =5*4/2*1 = 10 a-b-c(clockwise) and a-b-c(counterclockwise) are considered as different type, 3 3 3+3-1 3-1 and a-b-c(counterclockwise) are considered asa, different type, thata-b-c(clockwise) add one case. Therefore, whole cases of composition constituted by b, c is 11. that add one case. Therefore, whole cases of composition constituted by a, b, c is 11. In addition, 11 triangles have 18 different angles. The Process, composition of triangle panels, makes up the unfolding plan. If the sum of angles In addition, 11triangles, triangles connected have 18 different angles. The composition of triangle makes unfolding plan. If the sum of angles of three of more with matching theirProcess, same sides in the center point, panels, would be 360˚, up thethe triangles would be on a plane. of threeIf of connected withbe matching sides they in the center point, would be 360˚, the triangles be on aofplane. However, themore sum triangles, of angles of them would more ortheir less same than 360˚, could form three-dimensional space. It is would the process creating However, If the sum of angles of them would be more or less than 360˚, they could form three-dimensional space. It is the process of creating space that plane objects are acquiring space that plane objects are acquiring threedimensional property. three- dimensional property. If sum of angles - 360˚ > 0˚ center point would go up. If of sum of angles -< 360˚ > 0˚ center go up. If sum angles - 360˚ 0˚ center point point wouldwould go down. of angles 360˚ < 0˚ point centerwould pointbe would go plane. down. If sum If ofsum angles – 360˚ = 0˚ center on the If sum of angles – 360˚ = 0˚ center point would be on the plane. The development figure, formed through this process, would be in unfolding state or in folding state according to necessity of the shelter. The development figure, formed through this process, would be in unfolding state or in folding state according to necessity of the shelter.
■Process of formation of development figure ■Process of formation of development figure
■Folding process ■Folding process
94 Sangwook Park
If it forms vertical If it forms verti applied. Material applied. to stand liveMater load to stand live lo addition, frame s addition, fram panels for suppor panels for sup
angles
eating
■Section of joint The composition of triangular panels is connected with non external force type which should used, if it is considered that there is not be live load.
■None External Force Type If there is no live load, non external force type would be used. Material of these panels is light, and thus its dead load is minimized
■Section of joint ■Section of joint connected with bottom
If it forms vertical structure, external force type is applied. Material of these panels is substantial efficient to stand live load and light to reduce dead load. In addition, frame structure is added to connection of panels for supporting more live load.
■External Force Type
Sangwook Park 95
â&#x2013; Model work(1/50)
Three dimensional connections among spaces lead to unique experiences in the city.
TYPE_C The installation consists of five stories, and upward two floors serves as a movie theater. It makes new experiences in downtown. It has no regulated seats, entrances or exits. People in downtown flows into and out. Most spaces of installation can serve as outdoor gallery. Three dimensional line of flow make exhibition more pleasure.
0m
10m
20m
â&#x2013; Section
TYPE_A
The more kinds of bus service routes, more complex flow of people. Twisted space provides division according to routes.
The Bench is useful for both people waiting for bus and pedestrian. Dividing a bus station from a sidewalk, it provides meeting spaces.
B
Bus stop is one of the places in which a lot of people crowd. Through twist, lines of flow on the street smoothly are divided as people passing and waiting the bus. The composition of triangular panels is connected with non external force type which should be used, if it is considered that there is not be live load. 0m
96 Sangwook Park
■Plan
0m
10m
20m
30m
40m
50m
eriences in the city.
■The Development figure
Most of pocket parks between buildings in the city are losing their original functions. While making unusual environments, the Installation composed of triangle panels provides various events. There are three-dimensional continuous spaces, connected by lamp composed of triangle panels.
TYPE_B ■Dance performance ■Music When there is street performance, the second floor of installation is employed as a stage. Usually, hill it provides people to take a rest like hill.
■The Development Figure.
Base floor plan
Second floor plan
The space formed by composition of triangular panels is continuous. Folding panels connected with each others makes space continuity. Inner space connected with out door as well as second floor not by door or stair but by connected panels. 0m
5m
10m
15m
20m
Sangwook Park 97