FURNITURE CHANGE REQUEST LOG Thursday, June 14, 2012 FLOOR/ARE A
LITTLE WO#
CR#
Customer # 14224
Page 1 TAG
DESCRIPTION
PROPOSAL #
APROVAL STATUS SHIP DATE INSTALL DATE/NOTES
Orders Received KD existing DIR office from 5044W relocate to new DIR DIRTT office outside workroom; Install Team room conf table and hanging overhead same day. Conf table/cred & stg on 3E
65969
3530674
Complete; Wall requires touch up
2-WE and 2-WB Wkst, (1) DIR office (removed seating from order)
66378
3538746
Staged on 3E
Product
Install glass stacks between 2235W and 2237W and keyboard trays per Jordan's direction-ordered (2) 48w; (1) T post, (1) drop down post
66379
3538747
Received
CR#88
Product
Credenza with 60w glass top-located on 3E
65970
(2) DIR office, task and guest chairs; 1-WA, 1-WB 2-task chairs
66242
(1) DIR office, task and guest chairs-Use product knocked down from CR#87
66380
6-WB, 1-WA & 1-WD, 1-WF Wkst and 2-Director Offices
65689
CR#106
Knoll Accessories for Wkst and CMC letter trays (2)
66662
5.24.12
CR#101
CR#98 is included in CR#101: (5) Wd LF-36/30w; 6-42w 3dr LF w/tops; 6-36w 3h BC w/tops; 2-WA; 2-WD; glass stacks 2-24; 2-36; 4-48; 10-Falcon tables; 1-Krug Dorso E -VP black fabric; post covers; elec rails; 5coasters/pads black
66387
6.27.12
5044W
CR#87
Product
3E
CR#89
Attic Stock
2W
CR#95
5044W 3W
WO-10
CR#93
Product
5W
WO-12
CR#94
Labor Only
2W
WO-006
CR#51
Product
General
Product
To be installed 3538749
Complete Complete by 6.15.12
3530661
3W
CR#81
Product
Leather desk pad to CPD-for Bob Henderschedt
66887
Wtg on PO from AHS
5044W
CR#88
Product
Send PO for Film to Tint By Masters
65970
Send AHS Quote
5W
CR#91
Product
Additional transaction top for existing WA stations-WA ID#5228W (L config on corridor side)
66962
Order Placed
2E
CR#102
Product
Replace transaction top due to screw coming through while trying to tighten it Wkst ID#2296E
66962
Order Placed
6/20/2012
Complete
Received
FURNITURE CHANGE REQUEST LOG Thursday, June 14, 2012 FLOOR/AREA
LITTLE WO#
CR#
Customer # 14224
Page 2 TAG
DESCRIPTION
PROPOSAL #
APROVAL STATUS
SHIP DATE
INSTALL DATE/NOTES
Send AHS Quote
CR#104
Provide 30" w finished on 3 sides wood top for 30" w 2-dr lateral file-Match DIR edge
5E & 5W
CR# 113
Trading Desk; 2-lecterns, Board room Table
66874
Wtg on Shop Drwgs
5E
CR# 114
Add 18" w wing panel 49x18 to match all other exec admin stations-For Lauren Beers
66962
Order Placed
3W
WO-13
CR#115
Rotate existing cluster and divide mgr's offices-Need sketch from LITTLE
LITTLE
3W
WO-14
CR#116
Add 2-WB workstations-Have sketch from Little-Little Sent Revised Sketch with opposite hand wave
2W
WO-16
CR#117
Add 5-workstations bldg mgment
Send AHS Quote
3W
WO-18
CR#118
Add 1-WE and 1-WB workstation to existing clusters
Send AHS Quote
66962
Send AHS Quote for new Wave surface
NON-BILLS 1W 5E
What is status of replacement table top 1004W CR#32
Product
CMC bridge modesty panels-(3)54w and 1-60w (Knoll missing brackets-Non bill)
65829
CR#69
Product
Desk accessory options for DIR, VP/SVP -Black Oxide-Wtg on Qty from AHS
66229
Status?
NOTES: General
CR#103 Lobby
CR#92
Product
5E
CR#96
Labor
5054E
CR#62
Labor
2W
CR#90
AHS
Knoll Essentials Fixed Arm Sets (qty to be confirmed by AHS)
AHS
2-tall task chair cylinders not available for this Knoll-Essentials Task Chair-for Lobby chairsrevisit with alt option-keyboard tray, monitor arm? AHS to advise
AHS
Jeff to look at Bob Henderschedt's overhead left side; has mark from original Install? Jeff to re-finish section of existing board room table-to be done after March 1st -Onsite and S/T is fine Graphics-Rick-Jordan to meet with Rick to confirm what is not working with 2-open peds that were received
6/20/2012
Jeff
Jeff to Schedule
Jeff
Jeff to Schedule
DIRTT CHANGE REQUEST LOG Thursday, June 14, 2012 FLOOR/AREA
LITTLE WO#
2E
2E
p.3 DESCRIPTION
Proposal #
OnSite Date
CR#
TYPE
Install Date
16A (23A)
DIRTT
DIRTT TV bracket -need install cost to F&I new quad box/conduit and cut tile; need ht a.f.f.
Complete
16B
DIRTT
Provide cost for 1-elec quad with elec faceplate only (1-duplex/1-empty); and 1 empty duplex-no faceplate; both new boxes require trim rings; provide 1" flex conduit from quad to duplex (approx 6') and 1" flex conduit from quad to above ceiling approx 10' with J Box
Complete
2W-45GH
WO12-006
51A
DIRTT
Provide Product for 2-new DIRTT DIR offices
65564A
5.28.12
3W
WO-10
93A
DIRTT
(2) new DIRTT DIR offices
65564B
5.28.13
Pending completion 6.14.12 Missing glass for doors; to be completed week of 6.18
5W
WO-12
94A
DIRTT
(2) new DIRTT DIR offices
65564C
5.28.14
Missing Quad Trim Ring-Place Order
97A
DIRTT
DIRTT Attic Stock
Provide Quote to AHS Provide Quote to AHS
2E
2110E
98A
DIRTT
Replacement Tiles (3) lower panels as result of relocation of overhead
2E
2064E
111A
DIRTT
cost to relocate door to original location
4W-4029W
WO-17
112A
DIRTT
AHS to use original cost
Cost to furnish and install 12'-0" perpendicular upholsterd wall and door/lock to match others.
6/20/2012
Wtg on Deposit
Received PO
Scope of Work Thursday, June 14, 2012
Page 4
CONTACT
AREA/RM#
CR#
PROPOSAL#
NELSON
2W
CR#44
LABOR
NELSON
2W
CR#45
FURN
Customer # 14224
DESCRIPTION
DATE
TIME
COMPLETION DATE
Deliver and Install (2) WB stations Replace bbf peds, ff peds & storage towers for CR#51 (WO-006) to have wood fronts
TBD
Punch Item-Krug sent incorrect edge 1W
Switch out damaged Krug conf table top-1004W
65969
TBD
62576OP
TBD
Install TBD 5E
5084E
Switch out CEO Conf Table Top-We are ready to schedule this-in WS warehouse NOTE: ONGOING Remove all cardboard packaging from jobsite/3E
PROJECT CONTACTS: Jordan Laloan
845.659.5949
Toni Berrios
407.463.6762
Aldous Gitles
321.439.6690
Kat
407.927.6897
WS PM: Barb Baldassano 407.968.0053 Furniture Install Lead: Joe DeLaRosa 321.591.0114 DIRTT Install Lead: Keith Westwood 561.635.2790 Lynn Meadows- Little 407.218.8274
PROJECT BUDGET DIRTT
COST
SELL
NOTES
Proposal #
VENDOR DIRTT PRODUCT ARCH GLASS FIS INSTALLATION FARCO PLASTICS FARCO PLASTICS MODULAR INSTALLATIONS TEMPERED GLASS, INC. WOOD KING DOETSCH GLASS/ALUM AOS DELIVER CHEMETAL FIS INSTALLATION PBI BASE INSTALL PBI LABOR -PUNCH DIRTT DESIGN PUNCH
PROJECT NAME
KNOLL
SELL
COST
Proposal #
NOTES
VENDOR $
190,513.45
$
$ $
14,342.12 585.00
$
$ $ $
10,584.02 3,846.60 1,000.00
$
$ $ $ $ $ $ $
3,633.00 5,608.00 200.00 619.00 1,215.00 33,395.00 180.00
$ $
$
1,956.12
271,084.86 18,590.40
BASE PROJECT BASE PROJECT BASE PROJECT
15,511.36
CHEMETAL-BASE PRJ CHEMETAL-BASE PRJ
64054 64054 64054 64054 64054 64054
$ $ $ $
87,434.65 5,149.59 9,778.50 3,001.92
$ $ $ $
119,768.02 5,952.08 16,621.94 3,520.48
63991 63991 63991 63991
BASE PROJECT
$ $
16,594.20 552.00
$ $
22,125.60 649.44
63991 63991
BASE PROJECT
$ $ $ $ $ $ $
1,575.00 25,738.00 1,039.50 620.10 10,355.44 438.00 1,350.00
$ $ $ $ $ $ $
2,293.85 34,133.55 1,439.25 930.15 13,542.25 649.50 -
64161 64204 64204 64228 64270 64270 64270
REMOVE HAWORTH FURN 10.8.11
$ $ $
57,463.53 2,890.00 1,693.44
$ $ $
76,734.97 3,210.00 -
64617 64617 64617
JOHN RING PRODUCT
$ $
430.50 4,983.22
$ $
6,835.05
64617 65381
JOHN RING FIS LABOR
$
411.00
$
1,006.50
65381
JOHN RING PUNCH
$
3,384.08
$
-
65381DE
-
65381DE
KNOLL PRODUCT CARNEGIE FIS INSTALLATION ICF/UNIKAVAEV ALLERMUIR LUNA TEXTILES-PFISTER
5,190.00 7,450.00
BASE PROJECT
CUT VERTICALS-PUNCH MULLION MATES/BRACKETS-PUNCH
64054DE
CUT DIRTT SKIRTS-PUNCH DELIVERY TO WOODKING TRIPS TO WOODKING
$ $ $
46,827.72 46,827.72 -
KD FURNITURE
64054 64054 64054 64054 64054 64054
FABRICATE TILES-BASE PRJ
ADD (3) QUAD BOXES
$
452.58
$
646.54
66054
LABOR FOR QUAD BOXES
$
600.00
$
857.14
66054
ADD ON LOCKS/CORNICE CAPS/GLASS
$
8,530.47
$
ARCH GLASS-PUNCH
$
514.44
$
PBI-LABOR
$
800.00
PBI-LABOR
$
800.00
279,374.80
BASE PROJECT BASE PROJECT
BASE PROJECT
DH PM SITE VISIT SERVICE AREA FURN SERVICE AREA FIS NSTALL KD 4-EX OFFICES VW PRODUCT VW-LABOR VW-STUDIO 3 F&I REAR OFFICES PRODUCT F&I REAR OFFICE FIS LABOR
$
BASE PROJECT
REPLACEMENT COLUMN REPLACEMENT COLUMN FIS LABOR
INCLUDES PBI LABOR
65233
-
RE-DO GLASS DOORS (8) 3.31.12
65233DE
JOHN RING FIS LABOR PUNCH
$
292.50
$
$
-
INSTALL GLASS DOORS (8) 3.31.12
65233DE
CR#1 F&I LATS
$
4,313.40
$
5,751.18
65649
$
-
INSTALL GLASS DOORS (8) 4.11.12
65233DE CR#1 F&I LATS FIS LABOR
$
1,467.00
$
1,767.75
65649
$
240,955.57
$
316,931.56
$
75,975.99
10,356.68
$
423,342.42
$
143,967.62
SERVICE AREA SERVICE AREA KD 4-EX F&I OFFICES-PHASE 1
TOTAL $
VW VW-LABOR VW-STUDIO 3
WRONG PR# WRONG PR#
INCORRECT WOOD FINISH
219,943.61