LAYOUT DESIGN’S \ PRESENTATIONS


TOILET CORE-1

FIRE EXIT STAIRCASE

TOILET CORE-2

AHU-4

AHU-3

The proximity to the Plumbing shaft and the service lift makes this the ideal location for the Break Out

FIRE EXIT STAIRCASE

FIRE EXIT STAIRCASE

AHU-1

LIFT CORE

AHU-2

FIRE EXIT STAIRCASE

FIRE EXIT STAIRCASE

Continuous stretch of Glazing & Windows provides work hall with maximum daylight BUILDING ANALYSIS


Cabins are placed in front of Toilet which provides screening to toilet entries & Also enable vast open work space

All Fire escape staircase can be accessed through wide passages without entering into any closed spaces.

LIBRARY

M CABINS

Open Work hall is placed along glazing side to get maximum daylight

BREAK OUT M

RECREATION

CABINS

OPEN WORK HALL

CABINS COLLABORATIVE WORK ZONE

OPEN WORK HALL

DATA CENTRE CABINS

OPEN WORK HALL

M

M

The proximity to the Plumbing shaft and the service lift makes this the ideal location for the Break Out

M

OPEN WORK HALL

HUB M CABINS

MEETING(M)

OPEN WORK HALL ADMIN AREA

BPO

All Support Spaces are placed nearby reception to have easy access without entering into work zone

LAYOUT ZONING ANALYSIS- OPTION-1

CABINS

INTERVIEW

RECEPTION

TRAININ G

Meeting Zone with including Board room & Conference room are placed nearby reception & center of floor plate to have easy access without disturbing workspace


The proximity to the Plumbing shaft and the service lift makes this the ideal location for the Break Out

Meeting rooms are placed in front of Toilet which provides screening to toilet entries & Also enable vast open work space CABIN S

BPO located at a corner in the hall enabling to perform as a seperate entity CABIN S

BREAKOUT

LIB OPEN WORK HALL

M ROOMS BPO

M

MEETING

M

MEETING

CABIN S OPEN WORK HALL

CABIN OPEN WORKS

DATA CENTRE

HALL

M

Open Work hall is placed along glazing side to get maximum daylight

COLLABORATIVE WORK ZONE

CABIN S

M M

Cabins placed overlooking the workhall to enhance the work setting.

CABIN S

CABIN S

OPEN WORK HALL

M INTERVIEW OPEN WORK HALL

RECEP

Open Work hall is placed along glazing side to get maximum daylight

M 20 TRAINING ROOMS

All Support Spaces are placed nearby reception to have easy access without entering into work zone

LAYOUT ZONING ANALYSIS- OPTION-2

C A B I N S


FURNITURE LAYOUT- OPTION-1


THANK “U”


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.