LAYOUT DESIGN’S \ PRESENTATIONS
TOILET CORE-1
FIRE EXIT STAIRCASE
TOILET CORE-2
AHU-4
AHU-3
The proximity to the Plumbing shaft and the service lift makes this the ideal location for the Break Out
FIRE EXIT STAIRCASE
FIRE EXIT STAIRCASE
AHU-1
LIFT CORE
AHU-2
FIRE EXIT STAIRCASE
FIRE EXIT STAIRCASE
Continuous stretch of Glazing & Windows provides work hall with maximum daylight BUILDING ANALYSIS
Cabins are placed in front of Toilet which provides screening to toilet entries & Also enable vast open work space
All Fire escape staircase can be accessed through wide passages without entering into any closed spaces.
LIBRARY
M CABINS
Open Work hall is placed along glazing side to get maximum daylight
BREAK OUT M
RECREATION
CABINS
OPEN WORK HALL
CABINS COLLABORATIVE WORK ZONE
OPEN WORK HALL
DATA CENTRE CABINS
OPEN WORK HALL
M
M
The proximity to the Plumbing shaft and the service lift makes this the ideal location for the Break Out
M
OPEN WORK HALL
HUB M CABINS
MEETING(M)
OPEN WORK HALL ADMIN AREA
BPO
All Support Spaces are placed nearby reception to have easy access without entering into work zone
LAYOUT ZONING ANALYSIS- OPTION-1
CABINS
INTERVIEW
RECEPTION
TRAININ G
Meeting Zone with including Board room & Conference room are placed nearby reception & center of floor plate to have easy access without disturbing workspace
The proximity to the Plumbing shaft and the service lift makes this the ideal location for the Break Out
Meeting rooms are placed in front of Toilet which provides screening to toilet entries & Also enable vast open work space CABIN S
BPO located at a corner in the hall enabling to perform as a seperate entity CABIN S
BREAKOUT
LIB OPEN WORK HALL
M ROOMS BPO
M
MEETING
M
MEETING
CABIN S OPEN WORK HALL
CABIN OPEN WORKS
DATA CENTRE
HALL
M
Open Work hall is placed along glazing side to get maximum daylight
COLLABORATIVE WORK ZONE
CABIN S
M M
Cabins placed overlooking the workhall to enhance the work setting.
CABIN S
CABIN S
OPEN WORK HALL
M INTERVIEW OPEN WORK HALL
RECEP
Open Work hall is placed along glazing side to get maximum daylight
M 20 TRAINING ROOMS
All Support Spaces are placed nearby reception to have easy access without entering into work zone
LAYOUT ZONING ANALYSIS- OPTION-2
C A B I N S
FURNITURE LAYOUT- OPTION-1