AIMS & OBJECTIVES The Central Idea of the Design is to have a Building which while serving as a Great Functional Fit for Clients usage is also reinforcing with Global Branding and at the same time being Site & Climate responsive. Site Building should belong to the site- designed in respect to Climate and land use around the building
Circulation pattern Defined movement for employee, visitors and services both for pedestrians and vehicles. .
C O R P O R A T E
O F F I C E
Climate responsive design – Green Building concept for a sustainable building.
International look and feel Use of minimalistic understated style.
Form & function Form follows function- Building components clearly Expressed in terms of Exteriors, Entrance, Workspace
PERESENTATION
# International look and feel
C O R P O R A T E
# Form follows function
O F F I C E
ARCHITECTURAL STYLE Three Building components are clearly expressed in terms of; Exteriors Entrance and Workspace
FORM FOLLOWS FUNCTION
# Signature, Minimalistic, Understated lasting style
# Usage of Natural Material Exposed Concrete Locally quarried material Timber/Wood Aluminium Steel
C O R P O R A T E
O F F I C E
PERESENTATION
CORPORATE OFFICE
PERESENTATION
SITE LOCATION Plot Area- 4591 sq.m. Permissible Height - 21mts. FAR – 125.
C O R P O R A T E
O F F I C E
Basement – G2 allowed
CLIMATE HOT AND DRY SUMMERS- MAX. 40 WINTERS-
MIM. 15
RAINFALL- 140MM
PERESENTATION
SITE PLAN Building should belong to the Site
Entrance landscape in the form of radial pattern to Match with the FORM of the Building.
Elongated site
O F F I C E
road around helps in efficient circulation of the vehicles
Elongated and corner nature of site leads to a building design favorable for Circular module which maximum day lighting can be captured
North facing site
North facing site allows a generous use of glass in the front.
C O R P O R A T E
Rear entry for ramp and service vehicles
Loop Road
circular building design helps in better penetration of light in the building
Internal design separates entry and exit leading to efficient vehicular movement. Facilitates efficient parking in the basement by avoiding bottlenecks. Allows Rear ramp entry to basement . North facing site allows a generous use of glass in the front
Entrance
SITE PHOTOS
C O R P O R A T E
O F F I C E
PERESENTATION
CIRCULATION Defined Circulation
Clearly defined movement for employee and visitors such that the; -employees enter directly to office area and -the visitors to meeting or guest entertainment area. The circulation also defines rear service entry.
Vastu
North-East entrance- favourable Building morphology stepping from South to North South is heavy in terms of massing Central Entrance in an atrium representing Brhama sthan
BUILDING ENTRANCE NE entrance favourable
Ramp entrance / Service entry
STEPPING BUILDING MORPHOLOGY
C O R P O R A T E
O F F I C E
PERESENTATION
CLIMATE RESPONSIVE BUILDING
1. Construction related measures
2. Building design related measures
3. Service Engineering related measures
Design elements Materials Shading devices Rain water harvesting Sewage treatment Landscaping
Efficient HVAC system Efficient lighting Renewable energy
ELEMENTS Low wall to window ratio on the West wall More glass on NE for day light and View Terrace Gardens Landscaping Water Body Increased Soft surface Area Courtyards as light well Cavity Wall Materials Low e materials Roof insulation Double Glazing
PERESENTATION
DESIGN MEASURESPASSIVE CANTILEVER LOUVERS TERRACE GARDEN TO REDUCE HEAT INTAKE FROM ROOF
MORE GLASS ON NE TO MAXIMISE DAY LIGHT AND VIEW
SHADING DEVICE
C O R P O R A T E
O F F I C E
TERRACE GARDEN
ELEVATIONAL VIEW
SHADING DEVICE
FLOOR PLAN
C O R P O R A T E
O F F I C E
PERESENTATION
PLOT-16
Plot Area Permissible Height FAR Basement
- 4591 sq.m. - 21mts. - 125. - B2 allowed
Area Statement:-
Area Allowed
Ground coverage- (60%) FAR (125) No of Cars
1836 Sq.m (40%) 5738 Sq.m (125)
1638 sq.m (37%) 5721 sq.m
88 cars
85 in Basement 10 in GF
Area Achieved
Floor Area Statement:Basement Floor Area Basement Floor Area Ground Floor Area First Floor Area Second Floor Area Third Floor Area
Total Floor Area
1586 sq.m 1586 sq.m 1638 sq.m 1574 sq.m 1542 sq.m 967 sq.m
8893 sq.m
GROUND FLOOR /SITE PLAN
FLOOR PLAN
C O R P O R A T E
O F F I C E
PERESENTATION
PLOT-16
GROUND & FIRST FLOOR PLAN
FLOOR PLAN
C O R P O R A T E
O F F I C E
PERESENTATION
PLOT -16
SECOND FLOOR PLAN
THIRD FLOOR PLAN
C O R P O R A T E
O F F I C E
PERESENTATION
VIEW
PLOT - 16
VIEW OF THE BUILDING
C O R P O R A T E
O F F I C E
PERESENTATION
OFFICE-2
C O R P O R A T E
O F F I C E
PERESENTATION
SITE LOCATION Plot Area
- 3792 sq.m.
Permissible - 21mts. Height FAR
- 125.
Basement
- B2 allowed
CLIMATE HOT AND DRY SUMMERS- MAX. 40 WINTERS-
MIM. 15
RAINFALL- 140MM
PERESENTATION
SITE PLAN
Rear entry for ramp and service vehicles
Building should belong to the Site
Entrance landscape in the form of A Grid Pattern To Match the Angular Form .
Elongated site Elongated and corner nature of site leads to a building design favorable for L shaped module which maximum day lighting can be captured
C O R P O R A T E
O F F I C E
Loop Road
Internal design separates entry and exit leading to efficient vehicular movement. Facilitates efficient parking in the basement by avoiding bottlenecks. Allows Rear ramp entry to basement .
SITE PHOTOS
Entrance landscape
FLOOR PLAN
C O R P O R A T E
O F F I C E
PERESENTATION
PLOT-20
Plot Area Permissible Height FAR Basement
- 3792 sq.m. - 21mts. - 125. - B2 allowed
Area Statement:-
Area Allowed
Area Achieved
Ground coverage- (60%) FAR (125) No of Cars
2275 Sq.m (60%) 4740 Sq.m (125) 86 cars
1973 sq.m (53%) 4738 sq.m 85 in Basement 10 in GF
Floor Area Statement:Basement Floor -1 Basement Floor -2 Ground Floor Area First Floor Area Second Floor Area
1973 sq.m 1973 sq.m 1946 sq.m 1899 sq.m 893 sq.m
Total Area
8684 sq.m
GROUND FLOOR /SITE PLAN
C O R P O R A T E
O F F I C E
PERESENTATION
FLOOR PLAN
PLOT-20
BASEMENT FLOOR PLAN
C O R P O R A T E
O F F I C E
PERESENTATION
FLOOR PLAN
PLOT-20
GROUND FLOOR PLAN
C O R P O R A T E
O F F I C E
PERESENTATION
FLOOR PLAN
PLOT -20
FIRST FLOOR PLAN
C O R P O R A T E
O F F I C E
PERESENTATION
FLOOR PLAN
PLOT -20
SECOND FLOOR PLAN
C O R P O R A T E
O F F I C E
PERESENTATION
C O R P O R A T E
O F F I C E
PERESENTATION
VIEW
OPTION-1
VIEW – MAIN ENTRANCE
C O R P O R A T E
O F F I C E
THANK YOU
PERESENTATION