GRANTS REGULATION TREATMENTS
Jun 1976
Dudley Pond - Timeline
840# of Aquazine (herbicide/algicide) 14 gallons Silvex (scattered areas) $6500 MA DEQE Source: Larkin (1979)
Jun 1977
- Sonar - Hand Pulling - Harvesting - Hydro Raking
Treatment reported, no data Source: Larkin (1979)
Jun 1968 Chemical treatment Wayland Park & Rec no data Source: Larkin (1979) Jun 1970 63 gallons of Silvex, 140 gallons Diquat, 504# Copper Sulfate Source: Larkin (1979)
Jun 1978 MA DEQE applies 500# of Aquazine (herbicide/algicide) Source: Larkin (1979)
Jun 1974 26 gallons Silvex (0.5 ppm 13 acres) 43 gallons Aquathol-K (0.5ppm unspecified areas) Source: Larkin (1979)
1968 DudleyJan 1968 Pond Assn 1st meeting
1979 Apr 1968
Apr 1970
Apr 1974
Apr 1976
Apr 1977
Jul 1977
Oct 1977
Jan 1978
Apr 1978
Jul 1978
Oct 1978
Jan 1979
SWQC organized by Town Meeting
1979
Storm W Management recommen
STUDYS SURVEYS & SAMPLING EXPERIMENTS
5/15/2010 5:53 a.m.
1
Jul 1982 Hydro Raking Olin's to Priscilla Path Jul 1981
Jul 1982
Hydro Raking Outlet Cove
Hydro Raking Rocky Point (Mathews-Rd)
1979 Jan 1979
SWQC Apr 1979 organized by Town Meeting
Jul 1979
Oct 1979
Jan 1980
Apr 1980
Jul 1980
Oct 1980
Jan 1981
Apr 1981
Jul 1981
Oct 1981
Jan 1982
Apr 1982
Jul 1982
1980 - 1983
1979
IEP Diagnostic/Feasibility Stu restoration of Dudley P
Storm Water Management - study & recommendations
| 1981 5/15/2010 5:53 a.m.
2
Feb 1985 - ?? 1987
$
SWQC $540,000 Clean Lakes grant from M (25% TOW matching) - paving & storm wa
Jul 1982
Hydro Raking Olin's to Priscilla Path
Jul 1985 Hydro Raking Outlet Cove
Jul 1982
Hydro Raking Rocky Point Mathews-Rd) Jul 1982
Jul 1985
Jul 1984
Hydro Raking Darack/Egnets Cove
Hydro Raking S. Dudley Rd Oct 1982
Jan 1983
Apr 1983
Jul 1983
Oct 1983
Jan 1984
Apr 1984
Jul 1984
Oct 1984
Jan 1985
Apr 1985
Jul 1985
Oct 1985
Jan 1986
1980 - 1983
ostic/Feasibility Study for the oration of Dudley Pond
81-89 HYDRO-RAKING troubled areas (not milfoil)
| 1983 5/15/2010 5:53 a.m.
3
Jul 1989
985 - ?? 1987
Hydro Raking Outlet Cove
n Lakes grant from Mass DEQE - paving & storm water control Jul 1989
Jan 1986
Jul 1986
Jul 1987
Hydro Raking N. Dudley Rd to Bayfield
Hydro Raking S. Dudley Rd
Apr 1986
Jul 1986
Oct 1986
Jan 1987
Apr 1987
Jul 1987
Hydro Raking Crest Rd Chateau
Jan 1989
Apr 1989
Jul 1989
Oct 1989
Jan 1990
Apr 1990
Jul 1990
Oct 1990
| 1989 5/15/2010 5:53 a.m.
4
Nov 1991
Special Town Meeting sets 10hp limit, 10mph limit, No launch by trailers between March 16th - November 15th May 1995
$
SWQC $10,000 grant from DEP for hand-pullling
May 1992
DPA - Sonar $17,000
Oct 1990
Jan 1991
Apr 1991
Jul 1991
Oct 1991
Jan 1992
Apr 1992
Jun 1995
May 1996
SWQC Hand Pulling $28,000
DPA - Sonar $18,500
Apr 1995
Jul 1995
Oct 1995
Jan 1996
Apr 1996
Jul 1996
Oct 1996
Jun 1991 Sep 29, 1996
Elliot Pollak discovers Milfoil in Dudley Pond "Excessive Milfoil Growth in 91"
Ted Fiust observes regrowth in letter to ACT
noted in SWQC report 9/11/95 to Selectmen
<
Pollution Focus
|
Invasive W
Jun 1996
DVM synoptic survey reports non-native Eurasian milfoil (M.spicatum) and curly leaf pond weed (P. crispus)
| 1991 5/15/2010 5:53 a.m.
5
Dec 1999
MWRA meeting at Town Hall regarding water levels in Dudley Pond
Jan 1997
Apr 1997
Jul 1997
Oct 1997
May 1999
DPA - Sonar (Outlet Cove - ACT reapplies at no cost)
SWQC - Sonar $30,000
Oct 1997
Jan 1998
Apr 1998
Jul 1998
Oct 1998
Jan 1999
Apr 1999
Jul 1999
Oct 1999
Jan 2000
Apr 2000
Sep 29, 1996
Fiust observes th in letter to ACT
|
Invasive Weed Focus
>
| 1998 5/15/2010 5:53 a.m.
92-03 four pondwide SONAR treatments 6
Apr 19, 2000 Jun 30, 2002
ConComm - Order of Conditions on MWRA over tunnel leak and remediation. Tunnel leak reported sealed 4/30/2002
Mass D Categ turbidity & e
Apr 2002
ConComm: find non-herbicide alternatives 2001 - 2005
$
Jun 2002 Apr 2003
SWQC - Hand Pulling $8,000
Jul 2000
Oct 2000
Jan 2001
Apr 2001
Jul 2001
Oct 2001
Jan 2002
Apr 2002
Jul 2002
DPA $40,000 grant milfoil control
DPA Sonar $30,000 Oct 2002
Jan 2003
Apr 2003
Jun 2002
2003
Suction harvesting experiment
ENSR - drawdown feasibility study for TOW
Jul 2003
Oct 2003
2004
GeoSyntec Stormwa Infrastruc Assessment T Report for TOW from Middle Sc Highway area a nutrien
Jan 2000 Dec 2002
In-lake water sampling
Apr 2002 - Apr 2004
DPA Weed Committee forms - ConComm mandate for non-chemical alternatives 18 treatment options - 10 year time line
| 2002 5/15/2010 5:53 a.m.
7
2002 - 2008
Jul 2, 2007
Mass DEP - classifies Dudley Pond as Category 5 Impaired waters (worst) turbidity & exotic species (milfoil and curly leaf)
DPA harvesting C 20 acres, 7 Jun 2005 - Jun 2008
$
2001 - 2005
DPA S-319 $70,000 grant control runoff from Middle School and Highway, stenciling catch basins, hand-pulling,weevils, and monitoring
Jul 12
DPA $40,000 grant milfoil control
DPA harvest 40 acre
Jul 16, 2007
DPA 8.5 acre Jan 2004
Apr 2004
Jul 2004
Oct 2004
Jan 2005
Apr 2005
Jul 2005
Oct 2005
Jan 2006
Apr 2006
Jul 2006
Oct 2006
Jan 2007
Apr 2007
2004 Jun 2007 - Oct 2007
GeoSyntec Study Stormwater Infrastructure Assessment Technical Report for TOW - runoff from Middle School and Highway area a source of nutrients
SWQC - GeoSyntec study "Watershed Nutrient Loading Assessment for Three Ponds in Wayland, MA"
May 2006 Jun 2008
DPA - Weevils experiment (s319 grant)
| 2005 5/15/2010 5:53 a.m.
8
Jul 2, 2007 - Jul 10, 2007
May 2010 - Sep 2010
DPA harvesting Circulators & Mansion 20 acres, 7 tons harvested
SWQC & DPA - Hand Pulling $12,000 May 2010 Jun 2010
Jul 12, 2007 - Jul 18, 2007
DPA harvesting Outlet & Chateau arms 40 acres, 24 tons harvested Jul 16, 2007 - Aug 16, 2007
DPA Shoreline Harvesting 8.5 acres, est 3.5 tons harvested Jul 2007
Oct 2007
Jan 2008
Jun 2008 Sep 2008
May 2009 - Sep 2009
SWQC& DPA Sonar $50,000
SWQC & DPA - Hand Pulling $12,000
Apr 2008
Jul 2008
Oct 2008
Jan 2009
Apr 2009
Jul 2009
SWQC& DPA Renovate Spot Treat $13,000
Oct 2009
Jan 2010
Apr 2010
Jul 2010
Jul 1, 2007 Jul 1, 2008
SWQC Pond Circulator experiment
Jul 1, 2007 - Jul 1, 2008
SWQC chemistry, counts & biomass estimates, visual sampling for circulators and control area.
07 MECHANICAL HARVESTING 5/15/2010 5:53 a.m.
9