Elise W._2024

Page 1


THE CITY OF THESEUS: TRANSCENDING

MATERIAL-REALITY-TIME

Year: 2024

Location: Universal [Paris, France]

Type: Academic

Individual

| narrative: obsolescence & time / | urban regeneration framework / | city-scale adaptive reuse system / | theoretical - materialistic practice overlaps / | development vs preservation dilemma / | virtual-physical living /

Chronogram mapping Architectural Paradigm Shift since Modernism with Social and Technological Events
Narrative of the Transformation in one Paris Building according to one set of Projected Urban Scenarios
Concept Diagram of Buildings in The Ship of Theseus

Narrative Iterations of different Components and Spatial Conditions across time frame

Narrative Stages of the Transformation from Conceptual Virtual Ideas towards Physical Material Components

RURAL ADAPTIVE

CASINA COMMUNE

Year: 2023

Location: Pravia, Italy

Type: Competition

Collaborated

| rural-urban relationship / | community retreat / | adaptive reuse / | temporary biodegradable construction material / | ephemeral architecture / | village revival /

1. AGRICULTURAL HARVEST
2. FOOD WASTE COLLECTION
3. WASTE MANUFACTURES INTO BRICKS
4. SPACE CURATION 5. USE 6. DECOMPOSE & FERTILISE

TEMPORAL STRUCTURES FROM BIODEGRADABLE BRICKS

MIAMI FLOATING BIOPHILIC

ESTATE

Year: 2022

Location: Miami, Florida, US

Type: Competition

Collaborated

Awarded - Editor’s Choice

| climatic change mitigation /

| community cultural preservation:

| _ Little Hait, Little River/

| affordable housings & construction /

| sustainable energy & agriculture /

| floating architecture /

| local economy facilitation /

Composition and Connection

Typological
of the Floating Village

MONOBLOCK IN REVERSE:

ALTERNATIVE (RE)DEVELOPMENT

Year: 2022

Instructor: James Westcott, Juliana Westcott

Location: Oxford Street, London

Type: Academic

Individual

| alternative block development model / | reaction to building obsolescence / | development vs preservation dilemma / | urban planning policies & guidance influences / | highstreet monoblock phenomenon / | material & cultural values / | block-scaled adaptive reuse /

The Monoblock in Making - Plot Acquisition Timeline and Details
Upper Level Integration
Ground Level Internal Street

Megablock - Connect without Fully Demolish

The consolidation of ownership puts dispersed buildings into great risk, as well as opportunity. The series of buildings can be connected according to structural feasibility, facilitating underused corners and activate the buildings for future adaptabilities.

PROFESSIONAL EXPERIENCE

Year: 2020-2022

Location: Hong Kong

MLKK Studio

Thomas Chow Architects

Involved in projects of different scales that equivalent to RIBA Plan of Work Stage 0-7

Range of Projects:

Product / Furniture Design

Installation in Use

Interior and Commercial Design

Architectural Planning Application

Architectural Concept & Schematic Design

Architectural Tender

WRISTCHECK

Year: 2021

Location: Central, HK

Type: Professional

MLKK Studio

Status: Completed

RIBA Stage 0-5

| layout design / | visual merchandise outline / | material palette testing / | visibility definition with materiality / | display product design / | concept-detail design-tender /

MATERIAL PALETTE
VISUAL MERCHANDISED SIMULATION

SHOPFRONT SIMULATION

STYROFOAM RECYCLING DEMO-STATION

VIA NORTH POINT

Year: 2021

Location: North Point, HK

Type: Professional

MLKK Studio

Status: Completed

RIBA Stage 0-6

| layout design / | visual display outline / | logo & graphic design / | circulation display curation / | experimental community engagement/ | concept-detail design-tender /

Layout is oriented into three main areas - ‘before’ storage, process machinery and ‘after’ storage. The facade is visually opened in showcasing each process as supplemented by the infographic in engaging the public.

VIA NORTH POINT:

A CYCLE OF LIFE IN CHUN YEUNG

Year: 2021

Location: North Point, HK

Type: Professional

MLKK Studio

Status: Completed

RIBA Stage 0-7

| community installation /

| public space revitalisation / | public engagement / | sustainability design- food waste power generation / | uses in urban fabric and context / | neighbourhood-street activities /

BECOMING RENEWABLE ENERGY THROUGH PROCESSING

RENEWABLE ENERGY TURNS INTO LIGHT&FERTILIZER FOR THE GARDEN

FOOD WASTE RECYCLING POINT
PRODUCE BIOGAS
1. FOOD WASTE FROM THE NEIGHBORHOOD
Concept Proposal to Incorporate Food Waste Collection and Expand Existing Resting Spot
Concept Proposal to Incorporate Food Waste Collection and Expand Existing Resting Spot
Community Engagement Workshop
Installation Attracts Local Awareness
Communal Food Waste Collection
Tram Drivers’ Breaks
Hawkers’ Improved Working Environment
Grocery Shoppers’ Resting Place
TRAMWAY
Cleaning Workers’ Resting Place

KOSHIRAKURA SUN TENT

Year: 2024

Location: Koshirakura, JPN

Type: Experimental

Status: Completed

| retractable canopy system / | public space revitalisation / | community engagement / | rural adaptable structures / | nature-existing connection / | adaptive seasonal activities / | light-heavy & adaptive-permanent /

HOUSE FRAGMENTS

REASSEMBLY

Year: 2024

Location: Sagishima, JPN

Type: Experimental

Status: Completed

| deconstruction-material reuse /

| public space revitalisation /

| communal labour progress - Hikiya /

| rural adaptable structures /

| nature-existing connection / | activities-induced adaptable structures /

| light-heavy & adaptive-permanent /

Existing City house

Existing City house

A 70 years old timber frame house sitting accross the beach was in need of demolition. The Red Dot School decided to deconstruct it slowly and in a different manner, it would take one year.

A 70 years old timber frame house sitting accross the beach was in need of demolition. The Red Dot School decided to deconstruct it slowly and in a different manner, it would take one year.

Existing City house

A 70 years old timber frame house sitting accross the beach was in need of demolition. The Red Dot School decided to deconstruct it slowly and in a different manner, it would take one year.

Cut 2 & 3 /

On the 17th of October, the remaining house was cut again. Only a small portion of it remained, and the corner of the kitchen roof was taken away. The house was only remaining fragments of its past condition, recalling stories it has sheltered.

Conditions of the City House after Deconstruction

Conditions of the Severed Fragments for Hikiya and Adaptation

Cut 2 & 3 /

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.