1 minute read
WASHBURN FACILITIES
Advertisement
The strength and conditioning center as well as the athletic training facilities help Washburn student-athletes be ready for the court and the field...
• The Whiting Field house expansion project was a $7.2 million renovation completed prior to the 2010-11 school year and is one of the largest training facilities in the MIAA.
• There are more than 12,000 square feet of workout space inside the weight room facility.
• There are 21 weight platforms for multiple teams to use at the same time.
• A 39-yard warm up lane made from field turf gives student athletes an area to jog and loosen up and cool down after their workouts.
• The Washburn Athletic Training center was renovated in 2012 and features a Hydroworx aquatic therapy pool along with additional therapy and injury prevention equipment and treatment options.