建筑作品集
ARCHITECTURE PORTFOLIO S E L E C T E D W O R K S 2 0 1 3 - 2 0 1 9
T A N 陈
X I N 欣
K A I 凯
EDUCATION
RESUME 个人简历
2009
学历
毕业于尊孔独立中学 Confucius Private Secondary School
2010 – 2013
Diploma in Architecture ALFA International College
EXPERIENCE
工作经验
2013 The Architecture Network - 28 Dutamas (Construction) - UTAR Kampar (As-built Drawings)
CGPA 3.0 2014 – 2016
2017 – 2019
Bachelor of Science (Hons) in Architecture
2016 Clement Wong Architecture
Universiti College Sedaya International (UCSI)
- Master Planning (Schematic)
CGPA 2.9
- Bungalow (Design & Construction)
Master of Architecture
- Factory (Design Develop.)
Universiti Tunku Abdul Rahman (UTAR)
- High Rise Housing
CGPA 3.15
(Schematic Design, Construction) - Low Rise Housing
- T A N
陈
-
X I N
欣
WORKSHOP
K A I -
凯
工作坊
2010 Archustic - Architecture Workshop
-
Architecture Installation - Champion
(Schematic, Documatation) - Church (Final Completion) - PRIMA Housing (Schematic)
Over 2 years of architecture experience, working in
2011 Terang - Architecture Workshop
- Community Mall (Renovation)
architecture firms. I had the experience working in
2012 Padi - Architecture Workshop
- Guard House (Renovation)
Master planning, High rise development, factory, housing, institute building and bungalow.
Skill in
delivery architecture design, drawings & project. My
2013 Dualisma – Architecture Workshop 2014 Architecture Experiencing Workshop – Thailand (Bangkok)
2019 Blank Design Studio
2015 Architecture Experiencing Workshop – Indonesia
- The House of Culture (Schematic)
(Jarkata, Bali, Jogja & Bandung)
goal is to continually expand my design skills and knowledge
in
Architecture
and
Design
at
a
professional level.
ACHIEVEMENT
学术成就
2011 Participation Terang – Architecture Workshop Design Competition
My philosophy is place people at the heart of the design process. Everyone connected to the design of
专业技能
Autocad Sketchup 3d Max
2015 Participation AC-CA – [Tokyo] Music Centre Competition
the product or environment should be involved in the design.
SKILLS
2016 Participation AC-CA – [Berlin] Gourmet Street Food Competition
Microsoft Office Adobe Revit
Y E A R
1
第 一 年
MASTER IN ARCHITECTURE
YEAR 1 – MASTER PLANNING
M A S T E R
MERGING THE GAP BETWEEN CITY AND COMMUNITY
DESIGN STRATEGIES
Full up the site, within the allowable setback.
Connected to surrounding areas by Multiple level of connection option, such as cultural, historical, andcommercial.
祕 壍
Cutting thru the site to create a link between North-South and East-West. It become the Spine of the Site.
Proposed plaza at the 3 main human circulation point. Become 3 main nodes in the site with proposed activities.
Proposed building block the fulfil the Plot Ratio requirement.
Innovative link bridge to connect people in another level. With more friendly to the users.
Home, work, school,stores and restaurants are within walking distance.
Create connection to the historical building. Balance the human density in the city.
BUILDING COMPONENTS
Creating a harmonize community for the surrounding context. A strong connection to unite the individual component. A diverse mix of housing and commercial to ensures activation of public spaces at all levels. Proposed Red as offices and Blue as the commercial retail and shops. It located at the Bottom and outer part of the site. Which embraced by the landscape at the ground floor level.
Green color is the elevated link bridge and landscape proposed on top on the link bridge.
Proposed Urban Housing building blocks, Housing block located at the inner part of the site. It protected by the commercial and offices. It represent the live in the project.
Red color in the diagram are lift core that connect from ground to Elevated Link Bridge. It located at the boundary of the site.
Ground Floor level green is the landscape and function activities area. Elevated Link Bridge Green are the elevated landscape the provide greenery for the offices tower. Green is Chill.
Upgraded Elevated Link Bridge connect to Elevated Link Bridges, from 4 sides of the site.
Y E A R
1
第 一 年
MASTER IN ARCHITECTURE
YEAR 1 – DESIGN COMMUNITY HOUSING
This project is to design urban community housing in the jalan dang wangi area of Kuala Lumpur. the neighbourhood is defined as the area bounded by jalan tuanku abdul rahman to the west, jalan sultan ismail to the north, jalan raja abdullah to the east and jalan dang wangi to the south.
M A S T E R
硕 士
Y E A R
1
第 一 年
M A S T E R
硕 士
Y E A R
1
第 一 年
M A S T E R
硕 士
Y E A R
1
第 一 年
M A S T E R
硕 士
Y E A R
2
第 二 年
MASTER IN ARCHITECTURE
YEAR 2 – DESIGN
M A S T E R
硕 士
Y E A R
2
第 二 年
M A S T E R
硕 士
Y E A R
2
第 二 年
KUALA LUMPUR SPORT CITY
M A S T E R
硕 士
Y E A R
2
第 二 年
M A S T E R
硕 士
Basketball Court
HEALING POT
Circulation / Loop
Boulevard
Y E A R
2
第 二 年
M A S T E R
硕 士
Y E A R
3
第 三 年
DEGREE IN ARCHITECTURE
YEAR 3 - DESIGN
BICYCLE COMMUNITY CENTRE
DESIGN
TAIPING - BICYCLE CENTRE
D E G R E E
学 士
Y E A R
3
第 三 年
D E G R E E
学 士
I N T E R N A T I O N A L
C O M P E T I T I O N
AC-CA – [Tokyo] Music Centre Competition
AC-CA – [Berlin] Gourmet Street Food Competition
W O R K I N G
E X P E R I E N C E
工 作 经 验 Project : 28 Dutamas Year : 2013 Project Stage : Completed Involved Part : Construction Drawings
T h e
A r c h i t e c t u r e
N e t w o r k
Project : UTAR Kampar Year : 2013 Project Stage : Completed Involved Part : As-built Drawings
W O R K I N G
E X P E R I E N C E
工 作 经 验 Project : 500acres Master Planning Year : 2016 Project Stage : Schematic Design Involved Part : Schematic Design
C l e m e n t
W o n g
Project : High-rise Housing Development @ Subang
Project : Rencana Mix Development @ Penchala
Year : 2016
Year : 2016
Project Stage : Construction
Project Stage : Construction
Involved Part : Schematic Design
Involved Part : Design Development,
Design Development
Contract Implementation
A r c h i t e c t u r e
W O R K I N G
E X P E R I E N C E
工 作 经 验
Project : New Commercial Small Mall @ Bukit Bintang Year : 2019 Project Stage : On Hold Involved Part : Schematic Design
B l a n k
D e s i g n
S t u d i o