Xinlu Chen Portfolio

Page 1

CHENXINLU

ARCHITECTURAL PORTFOLIO

1


EDUCATION:

COMPUTER SKILLS

University College London Bartlett school 09/2020-10/2021

MODELING MAYA Rhinoceros SketchUp Grasshopper ZBrush Revit Blender

Master’s Degree in Architectural Design, 09/2021, M Arch Guangzhou College of South China University of Technology 09/2016-10/2020 Bachelor‘s Degree in Architecture, 06/2020, GPA:3.45/4.0 Three Class Scholarship, 2017 Four Class Scholarship, 2018

CINEMA 4D

KEY RELATED COURSES:

AR/VR

Architecture Drawing, Basic of Architectural Design, Architectural Mechanics, Building Construction, Architectural Design Studio. etc.

01

bpro projrct

02

COMPUTATIONAL WORKSHOPS

03

Disney headquarters

04

when static meets dynamic

05

MULTI MAJORS student center

06

PARK INSTALATION

07

Balsam pear park

Grasshopper Unity

WORK EXPERIENCES

PRESENTATION

Tong Hang Architectural Design (Guangzhou) Co., LTD Internship 07/2019-10/2019

Adobe InDesign Adobe IIIustrator Proficient in Photoshop

Performed work which involved site investigation, drawing conventional designs and plans requiring the use of analysis and deductive reasoning. I worked on several projects performing different tasks taking including measurement, proposing concepts and configurations, modelling, community consultation and feedback. Guangzhou Zhuyuan Architecture Design Co., Ltd. 07/2018-08/2018 Internship

2D TECHNICAL Auto CAD RENDERING Keyshot Lumion 3D Enscape

Preparation of production drawings for architectural designs for a movie studio.

HONORS AND AWARDS COMPETITION 2020 National Green Buildings Design Competition- 3th Place

Xinlu Chen 2020

2

-Modelling, repairing and rendering models using the software acquired.

-This is a personal design done while available, during which time MAYA, rhino and other software were learned and applied to the design.

-This is the final project of the undergraduate university, which was entered in the national green building competition and won the third place.

- A self-study exhibition space for art students.

-An installation located in nature or a park for people to view and rest.

+44 7564574924

OTHER HONORS Second Class Award in Guangdong Traditional Wushu Championships Second Class Award in Music Video Contest, Guangzhou College of South China University of Technology Excellent Student Cadre for the Academy Year 2017-2018 Merit Student, Guangzhou College of South China University of Technology Second Class Award in Guangdong Traditional Wushu Championships

NATALIE

-A year-long design project completed during the master degree at UCL Bartlett school AD, which included hand modelling at bartlett school Bmade.

2018 2018 2018 2017 2017

natalie.xl.chen.@gmail.com London, United Kingdom natalie_xinluchen https://youtu.be/BeAVzmZM6_k

-According to the shape and characteristics of local balsam pear, the park is designed to popularize the cultivation of balsam pear culture for users.

ARCHITECTURAL DESIGN

CHENXINLU 3


DESIGN IN UCL BARTLETT SCHOOL DESIGN DATE:09/2020-09/2021

LamiNAR Inspired by the complexity and flexibility of bending wood lamination within the field of interior and furniture design, the project investigates the new method of craftsmanship in architectural design where traditional woodworking techniques have been integrated with cutting-edge computational technology through the interface of augmented reality. We propose a democratized user-owned platform for building off-grid wood house communities with the help of AR. We call it LaminAR.

4

5


BPRO PROJECT | LaminAR

BPRO PROJECT | LaminAR

Design Exploration

Design Study

DIGITAL DESIGN: FOLDING TYPOLOGY

FOLDING STEPS

COLUMN BREAKDOWN

Step 1 Catalogue of Connection Patterns: I

Step 2

Catalogue of Connection Patterns: T 6

Step 3 7


BPRO PROJECT | LaminAR

BPRO PROJECT | LaminAR

Interactive Input System MARKER + WOOD VENEER

FABRICATION& MATERIALS MULTIPLE USER COLLABORATION

FOAM

TIMBER

User 1

Thickness

2

Thickness

3

Thickness

4

Thickness

Bending degree

Bending degree

Bending degree

Bending degree

Springback

Springback

Springback

Springback

6

Extrusion

Thickness

2

Thickness

3

Thickness

4

Thickness

Bending degree

Bending degree

Bending degree

Bending degree

Springback

Springback

Springback

Springback

6

User 2

User 3

User 4 8

9


BPRO PROJECT | LaminAR

BPRO PROJECT | LaminAR

Space Typology INITIAL VOLUME SPLIT STUDY

GENERATIVE DESIGN DIGITAL SIMULATION: PROTOTYPE

HOLOGRAPHIC AR VIRTUAL TABLE

NODE STUDY Type A

Volume A Interwined Units

2 NODE ENDS

Volume B

Type B

Single Unit Twisting and Bending Volume Results Single Unit 1 NODE END Explore block shapes in AR Mode

Preview Volume Edge Lines in AR Mode

Two Units

NODE #1

Three Units NODE #1

NODE #1

10

11


BPRO PROJECT | LaminAR

BPRO PROJECT | LaminAR

FORMWORK FABRICATION

Structure Details

FORMWORK LOCATED LAMINATED TIMBER

Step1

Step2

FABRICATION RESULTS

Step3

Formwork Process

Construction Process

12

13


DESIGN IN WORKSHOP STUDY DESIGN DATE:04/2021-10/2021

DIGITAL WORK The first project was a workshop in Mariana's MAYA FLUIDITY 2.0, using MAYA, enscape and other software for modelling and rendering. The second project was a teamwork project in workshop 2 at UCL bartlett school Bpro in 2021, where the design concept was to design a house according to the domi-inon frame. The project was completed using rhino, grasshopper, ZBrush, keyshot and encape.

14

15


COMPUTATIONAL WORKSHOPS | Maya Fludity 2.0

COMPUTATIONAL WORKSHOPS | Maya Fludity 2.0

ARCHITECTURE ELEMENTS

DESIGN PROCESS

INTERIOR DESIGN

UNIT DESIGN

Top Floor

Slab 20%

40%

60%

80%

100%

UNIT CONSISTS The building is divided into four parts, three of which are made from a rotating array of identical unites and the remaining one is made from a deformation of an existing unit. Finally, the four parts of the building are joined at the bottom to form the corridor of the building.

Window Shades

Structure

Step 1

16

Step 2

Step 3

Site

17


COMPUTATIONAL WORKSHOPS | Maya Fludity 2.0

PERSPECTIVE

18

COMPUTATIONAL WORKSHOPS | Maya Fludity 2.0

ELEVATION

19


COMPUTATIONAL WORKSHOPS | Maya Fludity 2.0

COMPUTATIONAL WORKSHOPS | Maya Fludity 2.0

DESIGN & DETAILS

20

21


COMPUTATIONAL WORKSHOPS | Domi-inon House

COMPUTATIONAL WORKSHOPS | Domi-inon House

DESIGN & DETAILS

22

23


COMPUTATIONAL WORKSHOPS | Domi-inon House

COMPUTATIONAL WORKSHOPS | Domi-inon House

DESIGN PROCESS

ASSEMBLIES ARCHITECTURE ELEMENTS

DOMI-INON FRAME

DESIGN ELEMENTS Top Floor Unit 1

Column

Second Floor

Unit 2

Stair

Stair Slab

Unit 3 Column

20%

40%

60%

80%

100% After having the floor, the columns and the staircase, there are various combinations of floor, staircase and number of columns that fit the domi-Inon Frame, so we have experimented with various combinations. Ground Floor

24

25


COMPUTATIONAL WORKSHOPS | Domi-inon House

COMPUTATIONAL WORKSHOPS | Domi-inon House

DESIGN & DETAILS

26

27


COMPUTATIONAL WORKSHOPS | Domi-inon House

28

29


ARCHITECTURAL DESIGN

CHENXINLU

CHENXINLU ARCHITECTURAL DESIGN

PERSONAL DESIGN Design Date:01/2019-01/2020

Disney headquarters Northwest of the project is located in the west of Los Angeles, facing U.S. Bank Tower. The project is 230 meters high, a total of 60 layer, under a Disney store, including shopping, entertainment, and other functions, Tower atmosphere follow Disney style, decorate Tower has provided some interior design as well as places of entertainment, is committed to bring people back to childhood, relaxed and happy childhood experience again.

30

16 31


Edmonton PERSONAL DESIGN | Disney Headquarters

PERSONAL DESIGN | Disney Headquarters

Red Deer SITE ANALYSIS

DISNEY ANALYSIS

Yorkton Regina

Calgary

SITE SELECTION

Kamloops

ARCHITECTURAL FORM ELABORATION

Vancouver

NORTH DAKOYA

Seattle North WASHINGTON Pacific Yakima Ocean

HONTANA Billings

CRECON

Butte

SOUTH DAKOYA

IDAHO

Pocatello

Denver

Eugene

Boise

Grants pass Salt Lake City UTAH

NEVADA Reno

00:00PM

Game o8:ooam

05:00am

After work

03:00am

Shopping

02:00am

Tired

Music

KTV

12:00pm

unhealthy

Office

09:00pm

Boring

8:30pm Drink

Rest

08:00pm Work

Ordinary

Sen Jose

NEW MEXICO

On the south side of the bank of America building, there is a park called Pershing Square to the northeast, where the highrise building can echo the bank of America building based on the axis of the central axis, and there is a good view without being obtruded. √

Sen Francisco

CALIFORNIA

Albuquerque

The site is located in the direction slightly south of the Walt Disney concert hall, and there are opera house and museum nearby. It is a landmark ground-floor building, so it is not suitable to choose a high-rise site, so as not to damage the landmark of the building. ×

Sacrarnento

UNITED STATES Arizona

This site is located in the southwest of bank of America building, surrounded by four buildings and dense housing. It is not suitable for another highrise as the first site, so it is not suitable for the location of highrise. ×

Portland

WYOMING COLORADO

Located in the south of Los Angeles, this small plot is relatively large, with restaurants and art buildings nearby. However, the buildings are relatively dense and mostly low-rise, so it is not suitable for high-rise projects. ×

Los Angeles

Phoenix Tucson

San Antonio

Hermosillo

SKETCH

INSPIRATION

Disneyland Park Saltillo MEXICO

Culiacan

00:00PM

Outdoor recreation

10:00am

Outdoor playground

Slide outdoors

07:30am

Health food

03:00am

Outdoor playground

02:00am

Outdoor plaza

Watching the show 01:00am

Outdoor plaza

Slide outdoors 11:30pm

knowledge 08:30pm Globe

08:00pm Relaxation area

32

Relax

A day for ordinary people A day for people work at Disney headquarters

HOME

7:00PM 07:30am Meditation space Thinking

Would you be happier if a Disney appeared in your work area?The people who work at Disney headquarters live a childlike and healthy life.While others lead ordinary and repetitive urban lives, Disney headquarters is dedicated to bringing people back into the world of childlike innocence and joy.

33


PERSONAL DESIGN | Disney Headquarters

PERSONAL DESIGN | Disney Headquarters

FUNCTIONAL ANALYSIS

LOCAL PERSPECTIVE VERTICAL FUNCTION ANALYSIS

I'm tired after a day's work.

For Disney Level 56-60

The newly finished construction drawing needs to be revised again.

Fireworks

Sky wheel

For Disney Level 41-55

Working in an outdoor playground can be a lot of fun.

For Disney Level 26-40 Lease use Level 01-25

Lease use Level 13-25

Lease use Level 08-12

Water sports The playground here has many interesting items.

Circus performance

Snack car Little train

Shop area Office area The atrium space

Large office space inside the tower.It is divided into rental part and internal use part of Disney.

Small office space inside the tower.It is divided into rental part and internal use part of Disney.

The core of the building, a floor elevator for hire runs up to the 25th floor, and another elevator runs from bottom to top for use inside Disney.

STREAMLINE ANALYSIS

Entertainment area

Entertainment area

Shop area

Shop area

Office area The atrium space

The exhibition area

Tower entrance Common entrance

Office area

Tower entrance

The exhibition area

The exhibition area

Entertainment area

Queen's labyrinth Name: Union Bank Plaza Level: 40 Height: 230meters

I have to work overtime again today.

Carousel Puppet doll Living in Los Angeles, a dense city, is full of busy and impatient, people's life is also very boring.People who entertain and work in the Disney tower experience fun entertainment facilities and Disney themes every day.

34

Large office space inside the tower.It is divided into rental part and internal use part of Disney.

FUNCTION PARTITION ANALYSIS

A roller coaster

Lease use Level 02-07

For All Level -02 - 01

The shopping mall at the bottom of tower, with three floors, contains disney-themed colors.

There are many statues of animated characters, making it easy to fall into a Disney fairy tale.

For Disney Level 01-60

ARCO Tower

DISNEY RIDES Fireworks

×

×

A roller coaster

Circus performance √

Queen's labyrinth √

Snack car √

Name: Disney headquarters towers Level: 60 Height: 240meters

AT&T Switching Center Stuart M. Ketchum YMCA

Little train √

Sky wheel √

Water sports

Name: U.S. Bank Tower Level: 73 Height: 310meters

×

Los Angeles city hall

Carousel √ Puppet doll √ 35


PERSONAL DESIGN | Disney Headquarters

PERSONAL DESIGN | Disney Headquarters

GUIDE FROM SECTION

DISNEY ANALYSIS RENTAL OFFICE

DISNEY INSIDERS OFFICE

Disney's in-house café Office for Company's owner

Disney Insiders Office 26 F 50 F

Disney Insiders Office

LEVEL 02-03

LEVEL 08-12

LEVEL 26-40

LEVEL 46-50

Located in the lower part of the tower, the center is connected to achieve spacious space.

Located in the middle and bottom of the tower, it is specially designed for medium-sized offices of companies other than Disney.

The ground floor of the base level of the large office in the middle of the tower, for use by Disney insiders, is spacious and transparent, with a twostory height.

A midsize office at the top of the tower, for use by Disney's in-house technical staff.

LEVEL

LEVEL 13-25

LEVEL 26-40

LEVEL 51-55

Located in the middle of Disney's large rental office base level 2, for use by foreign companies rental office.

The base level of the large office in the middle of the tower, for use by Disney insiders, is two floors high.

A mid-sized office at the top of the tower, with more floors, is available for use by Disney's in-house technical staff.

LEVEL 06-07

LEVEL 13-25

LEVEL 41-45

LEVEL 56-60

Located in the lower part of the tower, it provides small offices for companies outside of Disney.

The base level of the large rental office in the middle of Disney is the first floor, which provides the rental office for the use of foreign companies.

A mid-sized office in the middle of tower, which is provided for use by Disney's in-house technical staff.

Office space Mid-size Office for Disney's workers

Mid-size Office for Disney's workers

Rental Office 02 F 25 F

Space for enjoyment

04-05

Located in the lower part of the tower, it provides small offices for companies outside of Disney.

Rental Office

Large and small size Office for rent Entertainment space

Disney shaoppinng mall Road 36

Road

The topmost office in the tower, used internally by Disney, is landscaped on the top floor to provide comfortable offices for the company's owners.

37


PERSONAL DESIGN | Disney Headquarters

PERSONAL DESIGN | Disney Headquarters

DISNEY ANALYSIS

LEVEL -01

LEVEL 01

LEVEL -02

Outdoor playground Outdoor playground

Create a disney-themed atmosphere that allows users to return to the joys of childhood.

5

There are special disney-themed rides for users.

3

At the entrance of the first floor of the tower, you need to swipe a card to enter the building. Only staff members can enter the building, while others need to register and use the temporary tenant card.

The first layer of the tower 4

3 1

1

1

2

1

10

1

3

3

10 1

1

9

1 1 1 1 1

4

1 14

1 1 1 1 1 1

4

4 3

1 1

31

3

1 1 4

1

1 1

Shopping mall

The first floor of the Disney mall leads to the outdoor space, which is made into a space of the indoor mall by the design of the height difference of the small hillside. The natural division of the interior and exterior makes the space full of richness. 38

3 1

4

1

3

1

1 1 1 1 1 1 1 11 1 1 1 1

1 14 3

3

LEVEL -01

3 4

Shopping amall

On the first floor of the Disney mall, an eight-meter space is dug into the ground. On this floor, there is the Disney animation hall full of Disney colors, and Disney character exhibitions will be held from time to time, which means the mall is full of subjectivity.

1

4

1 1 1 11

2 2

3 4 1 1 1

4 3

3 4 1

1 1

7

1

3

4 1 1

4 3

1

2

1 1 1 1 1

5

LEVEL 01

1

1

4 1 1 1

2

4 3

2 2

3

4 1 1

1

1 1 1 11

3 4 1 1

1 3

1

1

1

1

1 1

1

4

1

1

1

3

3

4

6

4

6

4

3 1 1 4 3

1 4 1 1

1

LEVEL -02

1 1

4 3

2 3 4 1

1 1 1 1 1 1 1

8

1

1

1 1 1 1 1 1 1 11 1 1 1 1

1 14 3

3 4

1.Store 2.courtyard 3.Toilet 4.Elevator 5.Outdoor playground 6.Indoor playground 7.Disney animation hall 8.Disney theatre 9.Fire control room 10.roadway

Shopping mall

On the second floor of the Disney mall, there is a Disney theater, which is a theater hall specially used for performing Disney operas. Movies are also shown at ordinary times, so that people can know more about the culture of Disney. 39


BACHELOR UNIVERSITY DESIGN Design Date:01/2020-06/2020

WHEN STATIC MEET DYNAMIC WEST MUSEUM COMMERCIAL BUILDING COMPLEX DESIGN

This design is a museum and commercial building complex, located in lingxi village at the foot of xiwoodsman mountain, nanhai district, foshan city, guangdong province. It aims to make full use of and inherit the rich culture and history of lingnan in foshan city. According to the local culture extracted from the combination of dynamic and static design, the formation of the project theme is quiet and dynamic.

40

41


BACHELOR PROJECT | When Static meet Dynamic

BACHELOR PROJECT | When Static meet Dynamic

Conceptual Analysis

DESIGN STRATEGY ANALYSIS

CONCEPT EXTRACTION

LANDSCAPE SIGHTLINE ANALYSIS

13 30

08 The park opens in 00 the morning and many visitors start to enter 10 In response to the 00

Lion dance equipment "covers" the performers' heads

Lion dance

Performers hold up lion dance equipment

Chinese landscape painting culture

Secondary entrance to the mall

Atrium skylight in the mall

daylight opening of mall

11 30

call of local cultural heritage, Cantonese opera performances start on time at a fixed time every week

After watching the performance, visitors can go to the indoor or outdoor teahouse for tea tasting, a variety of tea flavor is complete

After lunch at the riverside restaurant, the visitors gathered on the waterfront to watch the 15 There are many kinds of Lion Dance performances, Southern Lion 00 so there are two time Dance points to watch every day, which also enables tourists to have a comprehensive understanding of the local characteristic Lion Dance culture

16 00

Fireworks Can take kids out for a weekend walk in the sun, get some fresh air and exercise at the same time!

The Dragon Boat Festival has dragon boat races and people gather here to watch the races

Extract the outline of landscape in according with Chinese painting

main structure

A piece of cloth covers the building

The final architectural form

Rest area on the second floor of the museum

Atrium skylight in the mall

Combined with the extraction of contour lines and the derivation of the building facade according to the functional requirements of the building

Music Bar of mall

Corridor area on the first floor of the museum

Main entrance to the museum

Cafe shop of mall

ANALYSIS OF CONSTRUCTION MATERIALS

Mum and dad bring me here to play with the sports equipment, where I can meet so many friends!

Waterfront fountain

static Tough

Dynamic

After dinner, people can go to the waterfront to enjoy the cherry blossoms

18 00

Shopping mall

Museum Exhibition Hall

Zigzag outer profile

Local cultural equipment will also be displayed in temporary exhibition areas inside and outside the museum to provide visitors with a comprehensive understanding of the essence of local culture

No more summer heat when you're playing in the fountain with your friends!

Outdoor recreation area

APPLICATION OF ARCHITECTURAL ELEMENTS

17 00

Glass curtain wall

Glass curtain wall

Glass curtain wall

Glass curtain wall

Occasionally, you can come here for a walk and see the beautiful scenery along the waterfront.

extracted

Waterfront resting space

Gradual transition

Smooth

Dynamic

Red fibre fair-faced concrete

Red fibre fair-faced concrete

Red fibre fair-faced concrete

Red fibre fair-faced concrete

Sleek facade profile

extracted The water play area here is like a beach where we can swim and sunbathe!

Dynamic

Gradual transition

It's a nice place to meet friends for a chat on holiday and to sit in the shade!

Quick-drying concrete installation art

static

Dynamic

Combination of motion and static

Transitional spaces

extracted

42

When static meet dynamic

09

Quick-drying concrete installation art Waterfront Pool

08 00

Get up early in the 00 morning and come to the outdoor rest space, to the water shore for outdoor sketching

Photographers bring their equipment to the waterfront to photograph the beautiful scenery and the statues that represent the local culture

10 30

09 30

The family with the baby came to the river for fresh air

The elderly meet in the outdoor leisure area outside the building to relax and chat

11 00

Local residents and visitors watch a lion dance on the waterfront

13 00

15 30

The annual "Lotus Festival" attracts tourists to admire lotus flowers and lotus leaves

14 30

Tourists rent boats at the yacht center for water cruises to enjoy the surrounding scenery

During the Dragon Boat Festival, the annual dragon boat race is held at the waterfront

The water is clear and calm, and the local people raise fish here to boost the surrounding agricultural industry

17 30 43


BACHELOR PROJECT | When Static meet Dynamic

BACHELOR PROJECT | When Static meet Dynamic

Design Strategy analysis

Design Strategy analysis DESIGN STRATEGY THINKING

INSTALLATION ART ANALYSIS ANALYSIS OF THEFUNCTIONAL NODES OF THE BUILDING

OUTDOOR AREA SCENARIO ANALYSIS Roof surface in red fibre fair-faced concrete To meet the architectural requirements in terms of appearance

Quick-drying concrete

Square in front of the secondary entrance

Installation art

Square in front of the secondary entrance

Surrounding scenic spots

Cinema box office 3F

Museum exhibition area

The installation is constructed using quick-drying cement Its unique shape can become a landmark for the site

Top perspective

Installation lowest point node

2F Partially glazed curtain wall Maximising light

Hydrophilic terrace

Cruise center

43m

4.27m

3m

Riverside Restaurant 1F

Outdoor activity area

2F

Partially glazed curtain wall Maximising light

Sinking aquarium space

Music bar

Music Bar

Part of the building structure is exposed to the interior Enhances the visual impact of the building

Length of pedestrian bridge (43m)

Outdoor corridor on ground floor

Pedestrian bridge system

Van entrance analysis

Height above water surface (4.27m) Height of lowest point from site (3m) Installation node perspective

Perspective view of the installation elevation

Underground garage underground parking -1F

Underground -1F

-1F

Outdoor Grand Staircase Outdoor slope

Installation art footbridge

INSTALLATION RENDERING

Sunken aquarium space

Hydrophilic terrace

44

Vehicular entrance Pedestrian entrance

Installation art landmark

Under the cherry trees

Hydrophilic terrace

Entrance analysis

Entrance Front Square Aquatic animals space

45


BACHELOR PROJECT | When Static meet Dynamic

BACHELOR PROJECT | When Static meet Dynamic

Solution Deduction

Floor plans

SITE AND BUILDING FUNCTION ANALYSIS

BLOCK GENERATION ANALYSIS

Site surrounding buildings

UNDERGROUND PARKING PLAN

Museum exhibition area

Shopping mall

The site is contracted to the inner side to form the initial shape of the site

Site prototype

Underground space Main building

Open outdoor area

Push and pull the field down to create a height difference and place stairs

GROUND FLOOR PLAN

After forming the shape of the site, the landscape lawn is placed to complete the site design

Outdoor recreation area

Outdoor ramp design Outdoor landscaping system

Sunken aquarium space

Outdoor Visitor Yacht Centre

Place the blocks according to the shape of the site

ARCHITECTURAL FUNCTION ANALYSIS

According to the functional requirements, the volume is contracted and pushed to form the division of the site entrance and some leisure space

Two pieces of cloth are used to cover the two building monomers respectively to form the building shell

complete

BUILDING STRUCTURAL ANALYSIS Ground floor garage Shopping mall area

Museum office area

Museu Museum exhibition area

Mall cinema

Underground area

Underground Mall

Structural Steel Systems

Music Bar

FIRST FLOOR PLAN Individually supported roof and curtain wall systems

SECOND FLOOR PLAN

STRUCTURE SYSTEM ANALYSIS Maximum natural light Spatially folded panels with three-way diagonal cross Single layer grid structure Maximum natural light

Underground garage underground parking

Quick-drying concrete installation art Maximum natural light

Underground Mall Aluminium sheet recyclable material

Ground level parking

46

47


� Autodesk � � � �

19 - 1 48

Elevation view

49

� Autodesk��Autodesk � � � � ���� � � � � � � Autodesk � � � � ������ � � � � � Autodesk

� Autodesk � � � � � � � � Autodesk � � � � � � �

� Autodesk � � � � � � �

19 - 1

Elevation view

� Autodesk � � � � � � �

� Autodesk � � � � � � �

� Autodesk��Autodesk � � � � ���� � � � � � � Autodesk � � � � � � �

� Autodesk � � � � � � �

� Autodesk � � � � � � �

� Autodesk �� Autodesk �����������

Elevation view

� Autodesk � � � � � � �

� Autodesk � Autodesk ��� �� �� �� �� ���

� Autodesk � � � � � � �

� Autodesk � � � � ������ � � � � � Autodesk

� Autodesk � � � � � � �

� Autodesk � � � � � � �

� Autodesk�� Autodesk � � � � ���� � � � � � � Autodesk � � � � � � �

Elevation view

� Autodesk � � � � � � �

A - J

� Autodesk � � � � � � �

� Autodesk � � � � � � �

Elevation view

� Autodesk � � � � � � �

Elevation view � Autodesk � � � � � � �

1 - 19 J - A

1 - 19

Elevation

Physical model of building

BACHELOR PROJECT | When Static meet Dynamic

BACHELOR PROJECT | When Static meet Dynamic


PERSONAL DESIGN Design Date:01/2019-01/2020

PARK INSTALlATION WHEN CHAIN MEETS CONCRETE

This project is an installation art, on the basis of planar line, add the gravitational field, under the action of gravity, make the line sag, hang on in the process of selecting a suitable points to make line stop the free fall, and then use the chain instead of the line form, into a fixed structure, reoccupy quick-drying concrete layer and the outer package to make it quickly form, and then put the device upside down on the ground.

50


PERSONAL DESIGN | Park Installation

PERSONAL DESIGN | Park Installation

RESEARCH

MORPHOLOGICAL ANALYSIS

Vertical form simulation of iron chain

Size:3m by 3m

TECHNICAL ANALYSIS Single pico liters

1 3D PRINTING TECHNOLOGY FOR METAL

Nano particles

1 Accelerator Early strength agent

Metal objects

NPJ technology is the latest metal 3D printing molding technology developed by Israeli company Xjet. It uses nanometer liquid metal, which is formed by ink jet deposition. The printing speed is 5 times faster than ordinary laser printing, and it has excellent precision and surface roughness.

2 Quick Dry Cement 2 CONCRETE ACCELERATOR

Range

Admixture that can make concrete set and harden quickly.The content of the admixture is only 2% ~ 3% of the cement content in the concrete, but it can make the concrete set in 5 minutes and the accelerator set in 12 minutes.

Droplet injection molding process

Metal particles are distributed in droplets

Metal granulation

Anterior plane

Gravity

Gravity

Average Vertex

Anterior plane

Votex filed

Gravity

Average Vertex

Anterior plane

Gravity

Gravity

Average Vertex

Anterior plane

Wind

Gravity

Average Vertex

Anterior plane

Gravity

Gravity

Average Vertex

Anterior plane

Votex filed

Gravity and Wind

Average Vertex

Anterior plane

Rotating

Gravity

Average Vertex

Anterior plane

Gravity

ArchitGravity

Average Vertex

Anterior plane

Rotating

Gravity

Average Vertex

Anterior plane

Gravity

Anterior plane

Gravity

Gravity

Average Vertex

Anterior plane

Liquid phase discharge process

It has the properties of early strength and high strength, high frost resistance, corrosion resistance, high permeability and corrosion of reinforcement.The two kinds of fast - hardening cement have good durability.

Aluminate cement has fast setting and hardening speed, high hydration heat, concentrated heat release and strong resistance to sulfate corrosion.High heat resistance.

Water glass accelerator

Aluminate cement THE UNITED KINGDOM

RUSSIA

Powder accelerator Germany

MATERIAL ANALYSIS MATERIAL ANALYSIS Strength Agent And Accelerating Agent

CHINA

Liquid accelerator

1.Different mechanism of action 2.Performance difference 3.Use and use method are different

An admixture that makes concrete harden quickly.The time required for concrete to change from liquid state to solid state is shortened to achieve the purpose of rapid concrete condensation.

UNITED STATES

Liquid accelerator is a new generation of high efficiency and multifunction accelerator synthesized by inorganic salts and organic polymer materials.

GH high performance concrete

AUSTRIA ETC Although you condense fast, but not equal to the strength of high ah, can not be proud!

Fast setting time, high hourly strength, strong adhesion, compressive strength of more than 70MPA, 1-3 hours can be opened to traffic and other characteristics.GH construction operation time can be adjusted according to the needs of the site.

Water glass accelerator Early strength agent Increase the solubility of cement minerals, accelerate cement hydration and hardening, can make cement surface density increase, play the role of early strength. Accelerator

With sodium silicate as the main component, the foreign products include sika -1 in Austria and sigunit -W in Switzerland.This kind of accelerator condensation, hardening quickly, early high strength, good permeability, can be applied at low temperature.

BRAZIL

Average Vertex

Early strength agent

Concrete accelerator

52

Gravity

Gravity

Gravity

Average Vertex

Quick dry cement

53


PERSONAL DESIGN | Park Installation

PERSONAL DESIGN | Park Installation

MORPHOLOGICAL ANALYSIS CHAIN MORPHOGENESIS

RENDERING

ARCHITECTURAL DESIGN

CONCRETE FORMATION PROCESS

SMOKE GENERATED

Smoke smoke form around the concete

0%

CHENGXINLU

0%

0%

40%

40%

70%

40%

The chain A body formd bu the action of gravity

70%

MODEL The process of forming concrete by forming iron chain Smoke: smoke forms around concrete Iron chain: body s formed by the action of gravity Concrete: a layer of quick-drying concrete surrounds the chain and forms quickly Smoke effect

100%

1.Firstly, determine the size of the iron chain. In the preliminary experiment, it was concluded that the iron chain with a radius of 1mm is easier to be fixed. Print the radian shape of each line according to the model line, then fix the iron chain according to the printed line, With the sagging effect of gravity, the iron chain presents a shape and dip the glue in.When the glue dries, place the numbered chains in order.

Smoke is designed according to the track of the chain, so that the smoke is interspersed around the chain, forming a winding.

70% 90%

Flip

Concrete The chain is surrounded bu a layer of quick-drying concrete that forms quickly

The chain Under the influence of the gravity of the earth and the vortex force field, the iron chain will sag randomly, and then intercept one of the moments to be fixed, hanging the iron chain upside down and forming a device.

54

100% Due to the construction difficulty of the device, it is necessary to have a good handle on the time. Therefore, the use of quick-drying concrete for construction can not only solve the problem of time, but also complete the construction quickly and accurately.

100% The project can be located in any park or natural ecological park, extracting the elements of "fog" naturally generated in nature, wrapping the smoke around the concrete, interspersed with design, and allowing users to feel the nature more personally.

55


PERSONAL DESIGN | Park Installation

56

PERSONAL DESIGN | Park Installation

57


PERSONAL DESIGN Design Date:01/2019-01/2020

MULTI MAJORS HOUSE This project is located in Guangzhou college of South China University of Technology, Huadu District, Guangzhou City, Guangdong Province, China. It is a reading exhibition room named Multi Major House for students majoring in design. The architecture is designed by integrating the relevant technologies of three majors, echoing the majors of students majoring in design. This project combines the skills of three majors and finally integrates them.

59


PERSONAL DESIGN | Multi Majors House

PERSONAL DESIGN | Multi Majors House

FORM FINDING

SITE ANALYSIS

Size:3m by 3m GUANGZHOU BAIYUN INTERNATIONAL AIRPORT Located at the junction of renhe town and huadu district xinhua street and huadong town, baiyun district, guangzhou city, guangdong province, China, about 28 kilometers away from the center of guangzhou city, it is a 4F civil international airport.

This project is located in Guangzhou college of South China University of Technology, Huadu District, Guangzhou City, Guangdong Provincemajoring in design.

SOUTH CHINA UNIVERSITY

1

4

Located at no. 78, fenghuang north road, huadu district, guangzhou city, guangdong province, it is a collection of theme parks such as snow world, water world, sunac park and sports world.South China's largest indoor ski resort is located here.

HUADU DISTRICT GOVERNMENT

5

1

GUANGZHOU SUNAC THEME PARK

2

Located at no. 78, fenghuang north road, huadu district, guangzhou city, guangdong province, it is a collection of theme parks such as snow world, water world, sunac park and sports world.South China's largest indoor ski resort is located here.

4

Material:Aluminium Alloy Topology:Jewelry Winding

Material:Aluminium Alloy Topology:Jewelry Winding

Material:Aluminium Alloy Topology:Jewelry Winding

Material:Aluminium Alloy Topology:Jewelry Winding

Material:Plastic Topology:Three D Printing

Material:Plastic Topology:Three D Printing

Material:Plastic Topology:Three D Printing

Material:Plastic Topology:Three D Printing

Material:Plastic Topology:Three D Printing

Material:Woollen Cloth Topology:Stereoscopic Fold

Material:Woollen Cloth Topology:Stereoscopic Fold

Material:Woollen Cloth Topology:Stereoscopic Fold

Material:Woollen Cloth Topology:Stereoscopic Fold

Material:Woollen Cloth Topology:Stereoscopic Fold

Material:Mohair Topology:Skil

Material:Mohair Topology:Skil

Material:Mohair Topology:Skil

Material:Mohair Topology:Skil

Material:Mohair Topology:Skil

Material:Reinforced Concrete Topology:Plant Curtain Wall

Material:Reinforced Concrete Topology:Plant Curtain Wall

Material:Reinforced Concrete Topology:Plant Curtain Wall

Material:Reinforced Concrete Topology:Plant Curtain Wall

Material:Reinforced Concrete Topology:Plant Curtain Wall

5

6

It is located in huadu new city, facing tianmei river in the east, public welfare avenue in the west, nanda square south road, ziwei road in the north.Invested by the government in 1999, the plaza is located in huadu district government. It covers an area of about 300,000 square meters, with a greening area of 70%.

6

Material:Aluminium Alloy Topology:Jewelry Winding

GUANGZHOU NORTH STATION

2

HONXIUQUAN'S FORMER RESIDENCE Huadu district, one of the new eight scenes, is located in guangdong province, guangzhou huadu district dabu township guanlubu village.Near the former residence, there are hongxiuquan reading and teaching private school, hongshi ancestral hall and so on.

It is the largest high-speed railway hub station in guangzhou area, and has become a large-scale passenger transport hub in south China with 8 vertical and 8 horizontal passenger transport hubs integrating general railway, high-speed railway, high-speed railway, urban railway and subway.

7

7

3 Residential Area

3

GUANGZHOU YUANXUAN TEMPLE Huadu district, one of the eight new sights, is located near bi village, west of xinhua town, guangdong province.

60

Shopping Area School District Greening Countryside

61 61


PERSONAL DESIGN | Multi Majors House

PERSONAL DESIGN | Multi Majors House

ASSEMBLIES

PROGRAM DISTRIBUTION ARCHITECTURE PLANE Plant glass curtain wall

FIRST FLOOR

Aluminum plate

3D printing elements

Three-dimensional fold element

Learning space

Architectural exhibition 1 Material:Reinforced Concrete Technique:The construction

Material:Reinforced Concrete Technique:The construction technique

technique of concave and convex wall is applied to provide the foundation of plant outer wall and space for selfstudy room.

of concave and convex wall is applied to provide the foundation of plant outer wall and space for self-study room.

Material:Plastic Technique:Imitating the core of 3D printing technology, dots are extracted from the smooth wall to form light and shadow inside the building space. Material:Mohair Technique:Imitation of silk process,

made of aluminum alloy strip metal phase interweave, and around the outer outline of the building half circle, forming a sense of permeability.

Material:Plastic

Technique:The construction technique of concave and convex wall is applied to provide the foundation of plant outer wall and space for self-study room.

Material:Mohair Technique:Imitate stereo fold technology, create an indoor and outdoor crossing corridor space.

Material:Reinforced Concrete Technique:Divide the wall into

several small squares, and then pull up according to the rhythm, making it become the base of the plant outer wall.

Material:Plastic Technique:Imitate the core of 3D

printing technology, extract the dot on the basis of the outside outline of the building, and make it form the light and shadow inside the building space.

Material:Mohair Technique:Imitation of silk process,

made of aluminum alloy strip metal phase coordination, and around the outer outline of the building half circle, forming a sense of permeability.

Material analysis

Material:Reinforced Concrete Technique:The construction

Fashion design exhibition

technique of concave and convex wall is applied to provide the foundation of plant outer wall and space for self-study room.

Material:Plastic Technique:Imitating the core of 3D

Top view

2

Shared space

3

Technical analysis

Viewing surface Viewing surface

Left view

Entrance

Exhibition area Vertical function analysis Right view

Architecture

Fashion design

View lake Jewelry design

4

printing technology, dots are extracted from the smooth wall to form light and shadow inside the building space.

Material:Mohair Technique:Imitation of silk process, made of aluminum alloy strip metal phase interweave, and around the outer outline of the building half circle, forming a sense of permeability.

Landscape analysis

Jewelry design exhibition

Right view

The glass adopts the inlaying elements in the jewelry design, and integrates with the outline of the shell for irregular inlaying.Frosted glass blocks the sun's rays to a certain extent, creating a suitable and comfortable design environment for "designers".

SECOND FLOOR

2

Vision analysis

Left view

The design of the opening hole adds 3D printing elements in the architectural design, hollowing out the surface of the building shell, and ensuring the lighting and transparency of the building interior.

First layer functional partition

Left view

The shell refers to the threedimensional folding technology in clothing design and USES aluminum plate as the raw material.

1

Shared space

1

2

FIRST FLOOR

Learning space

2

Enter from the main entrance to the exhibition space belonging to the architectural students. Follow the stairs to the exhibition area of jewelry design.Finally go straight ahead, came to the world of fashion design.The sunken space in the middle is a Shared space where students can rest and meditate.

2

1

2

1 2

1

62

SECOND FLOOR There are two small platforms and four large platforms on the second floor.Each platform is a small learning area, providing a place for students in need to conduct self-study.The space below the platform is a Shared space where students can focus and then clash their ideas.

63


PERSONAL DESIGN | Multi Majors House

PERSONAL DESIGN | Multi Majors House

GATHERING SPACES ARCHITECTURE ELEMENTS

The road of the site adopts the form of winding and winding to spread outwards, referring to the gradual change of lines in the architectural design, winding technique in the jewelry design and threedimensional pleating in the clothing design.

Aluminum plate

DESIGNER'S READING GALLERY

The shell is integrated with three professional techniques, thus adopting the form of wavy folds, combined with partial openings and ribbon winding.

Science building

Design teaching building

Aluminum alloy encrusted glass case

This is a reading exhibition room specially provided for students and teachers majoring in architectural design, jewelry design and fashion design on campus. Architecture integrates relevant elements of the three majors.

Frosted glass

Modelling of aluminum plate

Mingbian Lake

Shaped white aluminum plate is used in the baluster. At the same time as forming the baluster, it extends directly to the ground to form the modeling column for support, so as to realize the selfsupport of the baluster.

Connected to columns to form a support system Bearing column

Branch road Small gathering space

Viewing platform Ascend

Sink

View of the lake Mini drama square

The second floor is divided into different areas by elevating the floor slab. The elevating part is the place where students and teachers discuss and study, while the unelevating part is the Shared space.

The second floor is for self-study

Shared space

Sink

Main road entrance

64

The first floor is an open exhibition space, which is also divided and guided by the circulation line according to the height difference of the floor. Unlike those who enter the exhibition space, they can learn directly from the stairs at the entrance of the main door to the second floor.

The first floor is an exhibition space

65 65


PERSONAL DESIGN | Multi Majors House

PERSONAL DESIGN | Multi Majors House

LANDSCAPE SKETCH LANDSCAPE NODES

The position relations

Peripheral environment analysis Dormitory

Project

This is a landscape surface, marked by a landscape sketch with an arc. Standing here, you can see the most beautiful view of the lake, while at the same time, you can look at the building from the most beautiful Angle.

LOCAL PERSPECTIVE OF THE SECOND LAYER

LOCAL PERSPECTIVE OF THE FIRST LAYER

LOCAL PERSPECTIVE OF THE FIRST LAYER

LOCAL PERSPECTIVE OF THE SECOND LAYER

The roadmap After getting up

After dinner

The mall Science building

Entrance Dining hall

Structures

After class Lake

The project and the main entrance of the project site, as well as the viewing area, form a triangle.

I study Jewelry design. I plan to come to Multi Majors House from the teaching building of jewelry college.

The location of the project is good. The distance from the surrounding buildings to the project is no more than 15 minutes,

The students of fashion design all like their works to be exhibited here.

Different students come here at different time periods on different routes.

I like studying here. There is a learning atmosphere here.

There is an artistic atmosphere here and I can find inspiration here.

Ring eyes Located not far from the secondary entrance of the project, it is the best viewing spot of the site, with a view of the lake in front and a view of the southwest facade of the building in the rear.It is a Shared space for people to rest and have fun.

66

67


PERSONAL DESIGN | Multi Majors House

PERSONAL DESIGN Design Date:01/2019-01/2020

Balsam pear park The project is a park located along the river in Dali Town, Foshan. Based on the design of balsam pear, a local specialty of Dali Town, the park is planned and designed according to the plane, facade and cutting surface of balsam pear. At the same time, there many viewing areas and experience areas for the cultivation of bitter gourd, aiming to popularize the local experience and culture of bitter gourd for the general public.


PERSONAL DESIGN | Balsam Peak park

PERSONAL DESIGN | Balsam Peak park

SITY ANALYSIS

MORPHOGENSIS

CONCLUSION

KEY TO FUNCTIONAL ELEMENTS

It was found that there was a vacant lot in Dalihuachai park in Foshan, and then combined with the characteristic fruit of Dalihuachai, we carried out research and exploration in this site.

Nanshan Forest Park

1.Bitter melon with its petals.

2.After the bitter gourd grows.

3.After cutting the bitter melon.

4.Bitter melon with its seeds.

Water area

Nanshan forest park is one of the key projects of Huicheng District, Huizhou city construction of green ecology.

NANSHAN

DATANG

Melon pavilion Cultivation of balsam pear

The twining design of the flower rack

The seeds of balsam pear spread out

The Lake

The Lake

The ticket office LUBAO

The park is beautiful, with land all around and a small lake in front.

The area is not large, but the scenery is beautiful.

LEPING

YUNDONGHAI

Sanshui forest park

SITE

Where bitter melon grows

LISHUI

Located in Dali town, famous specialty bitter gourd and shapi dog.

DALI

The design of balsam pear shelf

Bitter melon cross section seed

The flower rack above the path connects the whole park

Bitter gourd twines from the vine

Balsam pear planting viewing area

Experience area Balsam pear planting experience area

CHENCUN

BAINI

THE SITE

XIQIAO BEIJIAO LELIU MINGCHENG JIULONG

2.Extract part 1.Bitter melon

DALIANG LONGJIANG

Balsam pear growing area

LUNJIAO

HECHENG LONGJIANG

GENGHE

Yueming Park

PLANT LAKE 70

Yueming park in Foshan is a very worthwhile attraction. Most people who travel to a destination will choose a scenic spot.

Balsam pear shelf

GUICHENG

LECONG

YANGHE

Bitter melon pavilion

CHANCHENG

FOSHAN

Foshan Zhongshan park is located at the bank of Fenjiang river. It is a comprehensive park integrating publicity, exhibition, popular science, entertainment, diet and leisure.

Hang balsam pears

Huahai Park

DANZAO

Zhongshan Park

The pedestrian area

Rest area

SHISHAN

Sanshui forest park is a large comprehensive scenic spot with many scenic spots and unique scenery.

Vegetation area

Rest area

Interactive area

Shibixicun Park

Huxin Park

Park Entrance

Winding balsam pear

RONGGUI

The Lake Bitter gourd twigs and vines twine the shelf

Based on a part of a bitter gourd, this project uses its concave and convex shape to carry out functional park planning and design. There are a large number of bitter gourd planting areas in the planning, which are divided into experience areas and viewing areas, with sidewalks, rest booths and lake viewing area.

JUNAN XINGTAN

Qinghui Garden

Qinghui Garden is exquisite in construction, compact in layout, high in architectural art, light and flexible in building form, elegant and simple in reading, clear in garden space and clear in structure.

The outline shape of the path

The outer profile of the balsam pear section

3.Generate solutions

71


PERSONAL DESIGN | Balsam Peak park

PERSONAL DESIGN | Balsam Peak park

TOPOGRAPHIC GUIDE TO MATERIALS

RESEARCH The parking lot

FIBER GLASS

The Lake Roadway

MAHOGANY A carriageable bridge

FIBER GLASS

GRANITE

Name:Balsam pear planting and viewing area

Hight:4m

Name:Bitter melon planting experience area Hight:4m

72

Name:Balsam pear shelf (Rest area) Hight:4m

Name:Balsam pear shelf Hight:2m

Name:The bridge Hight:0.5m

Name:A rack of bitter gourd connected on the bridge Hight:3m

Name:Balsam pear shelf (Rest area) Hight:4m

Name:Balsam pear planting and viewing area Hight:4m

Name:The Lake Hight:-1m

73


PERSONAL DESIGN | Balsam Peak park

PERSONAL DESIGN | Balsam Peak park

PERSPECTIVE THE BIRD VIEW I

THE LAKE INTERACTIVE AREA - MELON PAVILION

THE BIRD VIEW II INTERACTIVE AREA - BALSAM PEAR SHELF

74

INTERACTIVE AREA - BALSAM PEAR SHELF

75


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.