Portfolio of Jade Xu (2017-2020)

Page 1

许明玉 MINGYU XU

PORTFOLIO

Landscape Architecture Academic Works 2016-2020 Tel: +86 15318519400 Email: xmy.1818@gmail.com


CONTENTS

01

THE GREEN LOOP

02

A Green And Blue System Loop For Edinburgh

02

LIVING ISLANDS

09

Water Infiltration Device System Along River

03

RECIRCULATION & REACTIVATION

15

City Open Space Transformation

04

WEAVING THE WATERFRONT

20

Regeneration Of The Former Industrial Zone

1


01

Date:

CITY OF EDINBURGH: EXISTING SOCIO-ECOLOGICAL TERRITORY

May 2020

Location: Edinburgh Scotland

The Loop

Collabration: Phase1: Bingwen Zhang, Mingyu Xu, Zhihui Lyu Phase 2 (Individual): Mingyu Xu

Edinburgh Context

Edinburgh is one of the fastest growing cities in Scotland with population numbers expected to grow significantly over the next 20-25 years. This is increasing the demand for new housing, transport and schools as well as other amenities. It is also strengthening the demand for improving existing open spaces and creating new parks

Proposing: A Green And Blue System Loop

集 品

Three key interventions and its visons: Retrofitting green infrastructure on hard surfaces • Attractive places to live and work which are adapted to climate change • Provide a network of green spaces that allow biodiversity to thrive, and wildlife to migrate within, and across, city boundaries.

Edinburgh's green spaces are at a incontinuous and incontinuous states and facing pressing challenges such as climate changes, this project integrates green and blue networks to metigate these problems. This project proposing a inner loop base on the existing green space and official green belts. The loop in Edinrburgh urban incorporate the blue system (Water of Leith) and the existing green corridor. Not only that, by expanding habitat through key streets and regeneration of existing green space, it can develop into a growing system of green network. The connecting loop will provide a network of green spaces that allow biodiversity to thrive, and wildlife to migrate within, and across boundaries.

This project was developed in response to the 2019 City of Edinburgh's Future Park Aspirations. It aims to create a singular landscape, resilient and remarkable, a unique setting for a fertile city adapting to the new conditions of the socio-ecological transition.

Green space regeneration and multi-layers creation • Different kind of spaces with different potential s for human occupation and ecological biodiversity.• Biodiverse habitats supporting our wildlife to thrive •Accessible quality greenspace where people enjoy better health and wellbeing Community growing • Enhancement of the recreational and educational value of the city's green space • Empowered, knowledgeable communities • Improved health and wellbeing

CEC Park

Education Centre

None-CEC ParkPark None-CEC

Community Centre

Official Green Belt Official Green

Belt

Water Of Leith Main Watercourses

Existing Green Space Fracture Some communities inaccessible to large green space and education centres.

400 Meters Green Space Around Water Of Leith

4 0 0 M ete r s R a d i u s o f C o m m u n i t y Centre (This is the distance nearly 50% of people would walk to access their nearest green space and roughly equivalent to a 5 minutes walk) Most 20% Deprivation Area In Scotland

2


PARK NETWORK DEVELOPMENT 1 Existing Green & Blue Central Loop

CONNECTING INTERVENTIONS Retrofitting Green Infrastructures

2 Extend Habitat Of River

The built environment has an important part to play in supporting and enhancing biodiversity. Some species rely on buildings for nesting or roosting sites.

There is also a strong relationship bet ween the built and natural environment in relation to water and air quality. Surface water run-off from sealed surfaces such as roofs and roads can cause f looding and increase pollution in our rivers and burns. Having more unsealed areas such as green roofs, Sustainable Urban Drainage Schemes (SUDS), gardens and soft landscaping helps to slow water run-off and absorb pollutants before the water reaches our rivers.

3 Connecting Communities and Deprivation Area With Green Space

Before

Reformation Of River Habitat

集 品

After

Before

After

Green Space Regeneration And Multi-layers Creation

Edinburgh has existed a structure of green and blue system, this project will reorganize and enhance its armature into a connecting network. Proposing Expand Habitatw

New Proposing Green Space

Most 20% Deprivation Area In Scotland

Community Centre Before

After

3


PROJECT SUMMARY DIAGRAM

PRPPOSED GREEN NETWORK

ISSUES

Existing green corridors disconnected & habitats fragmentation

Poor condition of existing green space with low biological values

Some deprivation communities inaccessible to large green space

Regeneration of existing p u b l i c s p a c e, e n h a n c e biological values

Accessible quality greenspace where people enjoy bet ter health and wellbeing

KEY DESIGN PRINCIPAL

STRATEGY

Choosing key routes to link fractured green corridor by retrofitting green infrastructure

集 品

许 Connecting existing green and blue system into a green loop

Remove Invasive species or dominant plants such as Ivy in green corridor Expand the habitat around Water of Leith

Install devices in green corridor to supports birds communities

TACTIC

Green Network

Education Centre

Most 20% Deprivation Area In Scotland

Community Centre

Tr a n s f o r m a t i o n t h e shoreline carpark into a water front green open space with multiple types of habitat to support wildlife to thrive

Add vegetation layers to CEC park

Shoreline public space with various revetments and education zones Creating shrub layers and ground cover onto existing green corridor at the North Fort Street Park Improve ecological buffer around shoreline car park site.

Overbridge and boardwalk to enhance accessibility Outdoor spaces for children and young people to play in and explore Walking and cycling provide a healthy transport choice to local amenities Community hub and activity spaces at site 4


Phase2

LAND USE 1:5000 at A3

INDIVIDUAL SITE PROPOSAL CONTEXT

许 Site Boundary

集 品

Site Situation

This project choosing the fractured area in loop as the site, aiming to connect and the loop and creat an unique shoreline public space for human and more-than-human with both ecological and social values.

Locating at the fringe of existing green loop, this site has a unique geological position — next to the shoreline, and it also sits at the end of green corridor.

5


PROPOSED REGIONAL PLAN Key Drivers: Diverse habitat for wildlife (especially birds) Waterfront public space A Connected green loop for Edinburgh Enhanced green corridor and street Resilient space adaptive to sea level changing and flooding

集 品

许 A Bird-scape As the estuary of the river is located on the Atlantic Ocean’s major bird migration axis, the proposal to expand coastal wetlands within the Estuary Park would increase the number of birds coming to the area, thereby reinforcing the identity of the Charente as a bird landscape.

6


Detailed Plan

1:1000 at A1

0

10

30

1

A'

4

A

100M

13 Wooden Plaza 14 Multifunction Plaza 15 Reflection Pond 16 Playground 17 Fountain Plaza 18 Viewing Platform 19 Stone Revetment 20 Recreation Plaza 21 Floating Platform 22 Lawns 23 Water Feature 24 Entrance Plaza

1 Wetlands Island 2 Timber Deck 3 Bird-viewing Structure 4 Stone Steps 5 Isolated Wetlands 6 Observing Platform 7 Terrace Playfield 8 Rain Garden 9 Buffer Vegetation Belt 10 Conection Overbridge 11 Landscape Lmaps Square 12 Service Centre

2 3

50

5

6

7

19

18

8

16

20

21

集 品

17

22

14

9 12

10

13

11

23

15

24

9

9 Entrance

Ground Cover Layer

Shrubs Layer

Aquatic Vegetation

Grass Layer

Trees Layer 7


A-A' Section Shrubs and grass for birds foraging

Human activity spaces: Stone stairs

Devices on trees for birds

Wetlands habitats for amphibians and birds

Elevated boardwalk:resilient to water level changes

Location

Time Dimension

Rain Garden

Location

Elevated Boardwalk

明 Terrace Playfield

Slope Lawn

集 品 Activity Space Marshlands Elevated Boardwalk

2050:With sea level rising, During flooding 2020:Normal Usage Trees Growing, Formation of wetlands

Grass lands transform into marshland continue providing habitat for more than human communities. Elevated boardwalk and the maniplated contours able shoreline green space keep its recreational function 8


The Mississippi River Oil and gas platform

Main port

Oil pipe line

Oil refinery

Oil transportation

Major industrial zone

02

LIVING ISLANDS

Water Infiltration Device System Along River

Site : Baton Rouge, Louisiana, America Area : 10 Hectares Instructor : Qian Sun Individual Work Date: 03/2018

集 品

The site located along the banks of the Mississippi River in Baton Rouge(Louisiana). Apart from the pollution of river itself, the river stage f luctuates around the year also be the main reason to blame for the current environmental decay, which further lead to the vegetation degradation, soil erosion, low dissolved oxygen levels and nutrient loading occurred and remain to this day. The design was combined by the multi-function device islands and the reshaped site terrain. Using the terrain to help islands filtration water and shield against f looding. The islands are the natural buffer for the mitigation of bank erosion control approach, stabilize it to gather the sediments and gradually, soil accumulate to create the lands in future. While the islands with the sediment of soil and concrete would be naturally growing in correspondent. This growing system also could apply as a protective system along Mississippi river, such solution as the growing process of islands would as creating the wetland islands and gradually convert to the natural protection of f looding buffer after years.

Pollution Process Of Oil

Data Research Of Pollution Issue In Baton Rouge Average Sediment Concentrations

50 40 30 20 10 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

3.0

1895—2014 80%Increase

30 20 10

Oil Refinery

Month of May for Baton Rouge

Trend Adjust For Flow 40

Oil Extraction ---- Nitrogen Runoff

Nitrogen In Water

Milligrams per litre

Total suspended solid(sediment) concentration(parts per million)

60

Chloride concentration(parts per million)

70

Cities above Baton Rouge Standard for Cities above Baton Rouge Cities below Baton Rouge Standard for cities below Baton Rouge

Average Annual Chloride Concentrations At Baton Rouge

2015

Average

2.5

Dead Zone Extraction

2.0

Transportation

Industrial

1.5

Runoff

1.0 0.5

Polluted Water Fertilizer

0.0

0 1985

1990

1995

2000

2005

2010

2014

Farming

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29

9


SITE ANALYSIS

Baton Rouge Stage Hydra-graph 50 45 40 35 30

Bankfull

25 20

Water Flow

46Ft

15

Water Soaking 29Ft

10

Residence

N 100 200

3Ft

Bank full

Low stage

Flooding Stage:29~46(Ft) 11 12 1

8 9 10

11 12 1

8 9 10

8 9 10

8 9 10

8 9 10

5 6 7

8 9 10

2 3 4

5 6 7

8 9 10

11 12 1

11 12 1

2 3 4

2 3 4

2 3 4

玉 5 6 7

8 9 10

Month

11 12 1

5 6 7

11 12 1

2 3 4

11 12 1

2 3 4

5 6 7

2 3 4

8 9 10

Month 2 3 4

11 12 1

B.R. 2017 Stage

2 3 4

11 12 1

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

B.R. 1935-2017 Average Monthly Stage

Bank Full:Around 29(Ft) Month

0

B.R. 1935-2017 Max-Min Stage

Low Water Stage:3~29(Ft)

Soil erosion area Project f lood

5

5 6 7

PERIODIC FLUCTUATING WATER STAGE

The Mississippi River

1000Ft

500

The river stage f luctuates all year round, which indirect cause environmental degradation and many problems.

5 6 7

Civic

5 6 7

Commercial

5 6 7

集 品

NATURE&HUMAN RELATIONSHIP

Environment Degradation: Soil Erosion & Dead Plants

Dirty Water: Rubbish & Pollution

Cargo Train Schedule

Inaccessible: Steep Slope

Off The Beaten Track: Lack Open Space Disconnect To Water

8:00

10:00

12:00

14:00

16:00

18:00

20:00

Every Monday and Thursday

10


MULTI-FUNCTION DEVICE ISLAND

FRAMEWORK Issue

Demand

Consequence

Pollution

Fluctuating Water Stage

Dirty Water

Water Purifying

Environment Degradation

Restoration Ecology

Soil Erosion

Retain Soil From Erosion

Flooding

Water Level Control

Little Accessibility To Water

Establish Connection To The Water

Lack Public Space

Add Activity Space

Cargo Train

Solving Height Difference Indicate And Alarm By Signal

Multifunction Device Islands Device In Water

Plants-Environment Interaction

Reshape The Terrain

Platform To Connect City With The Site

Bird Habitat

Buoyant Base With Permeate Holes

Extension Tether

Purification Flow

Active Carbon Absorb Organic pollutant

Ion-exchange Resin

Gradually Deposit

MATERIALS Main Water Flow

Sediment Progress Combination

STRUCTURE

Various Height Of Board Walks

GROWING ISLANDS Single Device

Nursery Pond Device On Land

Steep Slope Inaccessibility

Human&Nature Relationship

Wetland

DIFFERENT CONDITIONS

Strategy

POSSIBILITIES

Removing Chlorine by Replace It

Formation Of Terrain

Solar Energy Screen Mesh

Container of Filtration materials

集 品 Pedestal

With bailing eyelet and able to connect with each other

Purify Flowing Water

Peace Scouring Wave

Protect Erosion Bank

Mitigate Flood Water

Active Charcoal Fibre Filter Ion-exchange Resin Filter

Activity Space

Anchor

Insert in riverbed

Gravel Layer Keep stability and filtration

DEVELOPMENT Reshape Extend Flow

Original Site

Pond

Soil Erosion

Water Level Control

Add Device

Add Public Space

Water Flow

11


MASTER PLAN

N 50Ft 100Ft

200Ft

500Ft

集 品

LOW WATER STAGE

Platform Joins To Main Road Insert Device Islands Aeration Device Islands Waterfront Promenade Device Island In River Water Plaza Shrub Space Water Fountain

9 Play fields 10 Viewing Stairs 11 Open Lawn 12 Stone Bench Area 13 Beach 14 Retaining Wall 15 Adaptive Deck

FLOODING STAGE

BANK FULL

Lowest Stage At 3Ft

1 2 3 4 5 6 7 8

Normal Stage At 29Ft

Highest Stage At 46Ft 12


WATER PURIFICATION PROCESS Sediments Rust Suspended Particles(10-1000um)

Inlet Zone

Shallow Sediment Zone

Damp-tolerant Tree

Heavy Metal Ion (0.001-0.0001um)

Organic Matter(1-10um)

Aeration

Outlet Zone

Wetland Zone

Damp-tolerant Tree

Emerging Plants

Marsh Vegetation

Submersed Plants

明 Sedimentation pond Leaf & organic matter removal

Aeration islands Adding oxygen to water

Blue heron

Whit pelican Wood duck Striped bass

Channel catfish Striped bass

Red-eared slider

Crayfish Pecan

Big blue stem

Bald cypress

Water tupelo

Gulf fritilary warbler

Golden-crowned

Yellow-rumped warbler

Striped bass

Goldfinch bird

Channel catfish

Ruby-crowned

Beaver

Blue catfish

集 品

Egret

Guidance Pretreatment

Deep Marsh Vegetation

Rabbit

Southern magnolia

Over-cup oak

Dogwood

Live oak

one

Forest Z tland

hrub We

tlet Zone

etland erged W

Zone Devices

Pond Ou

d

Scrub S

t Wetlan

Emergen

Subm

13


PERSPECTIVE A

DETAILS Viewing Board Walk

Sediment Pond

Water Plaza

Aeration Islands

Device Islands

Guidance Islands

许 集 品

B

A

Water stage at Bank full

PERSPECTIVE B 14


0

RECIRCULATION & REACTIVATION

Site : Shanghai,China Area : 1.3 Hectares Instructor : Ruohao Wu Collaborator: Yanyu Yang, Youyou Shi Role As Team leader: Mapping, Analytical, Conceptual development, Street Design, Model, Axon-metric Date: 02/2017

City Open Space Transformation

Shanghai is one the largest cities in the world, the site area is located in the heart of Shanghai’s Hongkou District. A large number of vehicles and pedestrians share the same narrow road to make the road crowded and the hospital in the street escalate the problem. Since the rapid expansion of the city, disordered and crowded urban spaces have been a common problem, especially in large cities.

SITE AREA ANALYSIS

This project is aiming to improve some of the common problems in high-density urban areas. The design consists of two part,the regional area planning and the critical street design. In the regional,the key point is to separate circulation between pedestrians and vehicles, then reorganize the green space meanwhile adding new functions like parking lot and activity space.

PROBLEMS OF THE AREA Green Space Were Occupied Or Isolated By Barrier Wall

As for the key streets, meeting the demands according to different types of pedestrians’ characteristics. Therefore, it is possible for different destination’s pedestrians to choose efficient route without interfering with each other, but to provide recreation and communication options at the intersection of the circulation.

The Pedestrians And Vehicles Share The Same Congested Path

Crowded And Ambiguous Circulation

集 品

许 THE CRITICAL STREET CIRCULATION

CIRCULATION ANALYSIS

VEHICLES

PEDESTRIANS

The narrow streets mixed by vehicles and pedestrians, cause severe traffic congestion.

The office workers,nearby residents and the people to hospital escalate the congestion.

STRATEGY 1 Separate Vehicles And Pedestrians in Whole Area. The Street Only For Pedestrians. Vehicle Circulation

Office Worker Flow

Hospital Related Flow

STRATEGY 2 Reorganize The Street For Pedestrian Of Circulation And Public Space

Resident Flow 15


STRATEGY 1

REGIONAL PLAN

PLANNING THE REGION

After a reasonable transformation, this area provides enough space allow people conveniently parking right near their destination, and both pedestrians and vehicles will have a clearly and well-organized circulation.

Transform The Region From Circulation, Barrier Wall And Functions.

TACTIC OF THE REGION ho

Before

tal

spi

ho

tal

spi

After

hos

al pit

hos

al pit

hos

al pit

hos

CULTURAL CENTRE

al pit

许 2. Separate Pedestrian And Vehicle Before

After

PARKING LOT

玉 PARKING LOT CULTURAL CENTER

SPORTS

OUTDOOR THEATRE

3. Arrange Green Space Before

After

4. Add New Functions Before

After

PUBLIC GARDEN URBAN PARK OPEN STAGE SPORTS FIELDS

集 品

PARK

OUTDOOR ACTIVITY

SECRET GARDEN

RAL CENTER

1. Tear Down Enclosing Walls

OPEN GREEN SPACE

PARKING LOT SPORTS

HEATRE

CULTURAL CENTER

N

OUTDOOR THEATRE

25 50 PARK

100

200M By adding a versatile public space in this well-connected city centre, landscape design is the interface between nature and urban, providing cities with more sustainable and ecological possibilities. 16


DEMAND

USER

STRATEGY

2

USER

00:00

REDESIGN THE STREET FOR PEDESTRIAN

DEMAND

USERS

TIMELINE

NEED

TIMELINE

NEED

DEMAND

PRIORITY LEVEL

Time

hospi

21:00

03:00 00:00

21:00

Resident

03:00

Recreation

Catering

Resident

Users Schedule

18:00

06:00

Users Schedule

18:00

00:00

Catering

06:00

Patient

Recreation

Greenland

Greenland

Market Meet-up space

Market Meet-up space

Patient

00:00

06:00

12:00

18:00

15:00

09:00

Worker

Sports

Sports

Plaza

Plaza

DEMAND SPACE

ACTIVITY RANGE

EXTRACT BEHAVIOUR PATTERN

Need a clearly circulation to quick pass

OFFICE WORKERS

Worker

Require circulation of the orientated speedy movement of mass people.

hospital

集 品

RESIDENTS

Need green space to relax

24:00

REORGANIZATION

hospital

hospital

PATIENTS & STAFF

24:00

hospital

USERS

12:00

18:00

Waterscape

Waterscape

12:00

09:00

12:00

Parking lot

Parking lot 15:00

06:00

SWIFT

EFFICIENT

GENTLE

LEISURE

VIBRANT

VIGOROUS

hospital

Need outdoor activity space satisfy basic social contact

17


DISTRIBUTION ON THE STREET

DEVELOPMENT OF DESIGN 1. Three different users

2. Three different zones

3. Specific routes

4. Specific functions

STREET PLAN

集 品

N 10

25

50

100M

18


A

A NEW LIVELY AND WELL-ORGANIZED SPACE

B

C

集 品

A

C

B

19


04

CURRENT YANGPU DISTRICT

WEAVING THE WATERFRONT

Regeneration Of The Former Industrial Zone Site : Shanghai,China Area : 160 Hectares Instructor : Yuting Su Individual Work Date: 04/2018 The project included a redevelopment and open space plan for a 160 hectare area along the Huangpu River in Yangpu District, Shanghai, China. Carrying the historic legacy of the China industrial era, the riverside site has been forgotten and half-abandoned for years. Disconnected from its surrounding communities, the site has been overlooked by the f low of Shanghai’s development and opportunities.

% 40

Abandon Transport

20

Others

20

Manufacture

20

Assemble

0 1974

1980

1986

1962

1928

2004

2010

2016

The Second Industry GDP Proportion Of Yangpu District

0

2000

4000

6000

Waterfront Function Of Yangpu District

8000

集 品

The design vision is to stitch together the many parts of the site through a activity waterfront and existing industrial heritage to unlock the riverside’s potential and restore its historic memory. The key to unlock the potential of the site lies not only in creative ideas turning the former buildings into iconic cultural spaces, but also in the careful delivery process of remediation of the landscape and a network of open spaces and pedestrian links between the industrial objects. Offering a fresh approach to urbanism, one that carefully considers contemporary as well as historical contexts while creating a direct and vital link to the waterfront.

Historical Factory Yangpu District Old Industrial Area Existing Industrial Heritage Zone Greenland

Historical Factory

Waterfront Barrier

20


HISTORICAL CHANGES

CURRENT SITE ANALYSIS

Urbanization

This area has changed continuously throughout history, in keeping with various farmland,harbour and industrial uses. While inner area transformed into high density mixed use urban.

Dominated By Farming

Green Space

Industrialization

1920

1960

LAND USE TRANSITION

Urban Space

YangPu River

Inland Space

Inland Space

Public Space

ISSUES

GREEN SPACE FRAGMENTATION Low connectivity of the green corridor network,habitat fragmentation.

INACCESSIBILITY TO WATER

YangPu River

Changing of the waterfront texture is inevitable owing to social developments, and inevitably brings serious destructions to the nature and history memory.

Current Buildings

集 品

YangPu River

Industrial Area

Accessibility

Over the last century, the role of the riverside area has been evolving with the city development.

Farmland

RIVER WAY& REVETMENT

2017

10 30 60 Existence Year

Inland Space

There do not have public roads to the riverside. Citizens who living nearby for many years was never able to walk up to the Huangpu River in this region.

SEMI-ABANDONED HISTORICAL BUILDINGS

SIMPLEX WATERFRONT WITHOUT IDENTITY

Dense factories and structures distributed along the bank, most of which are semi-abandoned and demand reformed.

The river bank area has changed to hard revetment for transportation use since the industrial development.

21


STRATEGY Excavating And Revitalizing Of Existing Industrial Remains

Restoring Ecological Environment

Weaving History Ecology And City In A Common Framework, Leveraging Their Interdependencera.

Connecting City And Water

Inner City

Inner City Inner City

Promoting Habitat Connectivity. Connecting ecology corridor. Extending the green space.

Pr e s e r ve o r c o n s e r ve a n c i e n t a n d valuable industrial buildings and factories. Transform the old buildings and zones.

1

3

WATERFRONT PLAN

N

0 50 100

4

5

6

8

7

200

500M

B 9

10

14

11

A

2

Activate the waterfront. Engage the city edge.

16 15

集 品

C 18

12

19 17 20

13

21

1. Adaptive Deck

12. Promoting Plaza

2. Bird Conservation Centre

13. Culture Creative Industry Park

3. Transformed Bird-viewing Building

14. Waterside Grass-slope

4. Wetland Habitat Islands

15. Public Park

5. River Mouth Lagoon

16. Urban Beach

6. Transformed Buildings For Public

17. Culture Centre

7. Urban Farm Terrace

18. Floating Platform

8. Sightseeing Tower With Deck

19. Recreational Fields

9. Water Pool

20. Floating Platform

10. Converted Jetty

21. Preserved Structures

11. Amphitheatre

22. Transformed Silos For Public Use

A. Restoration Habitat Zone B. Public Park Zone C. History & Modernity Zone

22

The plan includes three elements — ecology, urban and history. Each of them were developed with its own characteristic and identity, which are derived from thorough analysis of context. 22


FUNCTION DIAGRAM

DISTRICT TRANSFORMATION GREEN SPACE

PUBLIC REALM

BUILDING FABRIC Public space

Walk Running

Gallery Event

Cycling

Water Pool

Memorial Jetty

Theatre

Market Square

Rail Promenade

Picnic Grove

Bench Plaza

History Museum

Building

Before

Sports & Recreation

Floating Platform

Water Pier

6.8

Ha Open space

Green wedge Sloping park Habitat

Event Plaza

12.8

4.1

Ha Green space

years of Average building age

Reformation structure Preservation building

Historical district Open space

After

44

42

Ha Open space

Ha Green space

57

years of Average building age

Habitat Education Urban Bird Centre Viewing Agriculture

ROAD SYSTEM

CONTINUOUS WATERFRONT Industrial Harbour

Tourist Centre

Public Park

ENTRY POINT

Before

14

7

minutes Walk to riverside

Entry Point

玉 After

average

6

19

minutes Walk to riverside

Entry point

Continuous Promenade

集 品

GREEN ACTIVE RIVERSIDE SPACE

0

Km Continuous path

Connected circulation

Innovation Centre

average

Historical Buildings Preserved Carriage

3.9

Km Continuous path

Riverside Promenade Viewing Platform

Tourist Centre

People will be able to walk, cycle or jog along 3.6km of the Huangpu River, with previously disjointed areas being connected up. 23


WATERFRONT PROGRAM

Viewing Platform

Preserved Historical Structures Urban farm

Water Stairs

Urban Farm

Viewing Platform

Wetlands Habitat

Sports Fields

Conserved former oil tanks

Stage & Open-air Cinema

31

集 品

Elevated Tree Walk

Continuous waterfront area with active paths

Bird Appreciation & Rescue Centre

24


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.