Projects & The Role Of The Mumbai Metropolitan Region Development Authority
TheMMRDAwascreatedin1975toguaranteeequalgrowthfortheMumbai MetropolitanRegion.Inordertoprovideplanneddevelopmentfortheentire territoryofMumbaianditsneighbouringsuburbs,theMumbaiMetropolitan territoryDevelopmentAuthority(MMRDA)wasfoundedin1975.TheMMRDA authorityhasbeengivenresponsibilitytoplanandoverseedevelopmentinitiatives throughoutthewholeregion.
Are you searching for new projects in vile parle?
TheMaharashtraministerforurbandevelopmentisinchargeoftheMMRDA.The MMRDAisalsoinchargeofthedevelopmentofnewurbancentres,the implementationandcompletionofimportantprojects,andeffortstoportraythe MMRasaneconomicallydevelopedregionbyofferingpeopleaccesstotop-notch facilitiesandahighstandardofliving.
MMRDA: Responsibilities and Roles
Whencreatingregionaldevelopmentplans,MMRDAThaneconsidersThane's developmentplans.
Offeringfinancialsupportforimportantlocalprojects.
Assistingthelocalgovernmentwithinfrastructuralinitiatives.
CoordinatingandcarryingoutplansorprojectsinsidetheMMR.
RestrictinganyactivitythatcanimpairtheMMR'sproperdevelopment.
Inareasincludingtransportation,housing,watersupply,andthe environment,keepinganeyeoncriticalprojectsandmakingsuggestionsfor improvement.
Authority of MMRDA
The4,355sqkmundertheMMRDA'sjurisdictionaremadeupof:
Eightlocalgovernmententities
largerMumbai
Thane
Kalyan-Dombivali
NaviMumbai
Ulhasnagar
Bhiwandi-Nizampur
Vasai-Virar
Mira-Bhayandar
There are nine local councils:
Ambernath
Kulgaon-Badlapur
Matheran
Karjat
Panvel
Khopoli
Pen
Uran
Alibaug
Major projects: MMRDA
MMRDA will expand the eastern motorway to Thane
AccordingtoareportintheIndianExpress,theMMRDAhasdecidedtoexpandthe EasternMotorwayfromChhedaNagarjunctiontoThaneviaelevatedroadsin KamrajNagar,RamabaiColonyandGhatkopar.ThiswillmakeiteasierforSouth
MumbairesidentstogotoThane.TheEasternMotorwaynowrunsfromPD'mello RoadinSouthMumbaitoShivajiNagarinChemburandhastwolanesgoingnorth andtwogoingsouth.TheEasternMotorwaywassupposedtobeextendeduntil Ghatkoparinaccordancewiththeoriginalplan,butitwaspostponedduetothe destructionofmangroves&aslumpocketthatgotinthewayoftheproject.Butthis issueisnowrectified.
Mumbai Metro
MMRDAhassetoutRs6,250croreforMetroprojectsintheMMRinitsbudgetfor 2022–2023.
NinemetroroutesarenowbeingconstructedaspartofMMRDA,whichwillreduce traveltimesbetweensomeofthemajorcentresandeasetrafficcongestionbetween theregion'swestern&easternsuburbs.TheMMRDAMumbaiMetroLinesareas follows:
Versova-Andheri-Ghatkopar,Line1
Line2A:DNNagar-Dahisar
DNNagar-Mandale,line2B
Wadala-Kasarvadavali,line4.
Thane-Bhiwandi-Kalyan,Line5
Line6:Kanjurmarg,Lokhandwala,Jogeshwari,andVikhroli
Line7:DahisarEast-AndheriEast
ExtensionofLine7,runningfromAndheritotheMumbaiAirportandfromDahisar toMiraBhayandar,isLine9.
Monorail in Mumbai
India'sfirstmonorailsystem,theMumbaiMonorail,connectsChemburintheeast withJacobCircleinthesouth.Itwasconstructedasafeederservicetothecurrent MumbaisuburbanrailwaylineatacostofRs3,000crores.Theline'sofficial openingtookplaceinFebruary2014.TheideaofextendingtheMumbaimonorailto Worliiscurrentlybeingconsidered.
Trans-Harbour Link in Mumbai
TheMumbaiTransHarbourLinkiscurrentlybeingbuilt,andtheMMRDAhas allocatedRs3,270croreforitinaccordancewiththebudgetfor2022–2023.The MumbaiTrans-HarbourLinkRoad,alsoknownastheNhava-ShewaLinkRoad, whichwasintendedtoimprovecommunicationbetweensouthMumbaiandNavi Mumbaiandrelievecongestionintheislandmetropolis,hasnotyetbeen completed.Theproject'sinaugurationisexpectedtotakeplacein2022while developmentisstillgoingon.ThiswillbethelongestseabridgeinIndia.
Alibaug to Virar multimodal corridor
Thisroutewillprovidethemuch-neededconnectivitytolinkthesevengrowth corridorsoftheMMR,whichincludeVirar,Bhiwandi,Kalyan,Dombivali,Panvel, Taloja,andUran.Therouteisplannedasa126-kmcorridortolinktheNH-8,the Bhiwandibypass,theNH-3,theNH-4&NH-4B,theMumbai-PuneMotorway,the NH-17,etc.
Sahar
Elevated Road
Thisroute,whichwasfinishedin2014,connectstheChhatrapatiShivaji InternationalAirportimmediatelytotheWesternExpressHighway.Thisroutewas designedasaresultoftheinternationalairport'slackofdirectaccessandthesteady growthintrafficheadingthere.
Eastern Freeway
Itwasintendedforthemotorwayprojecttoenableseamlessconnectionbetween southMumbai,Thane-Nashik,andPanvel-Pune.Thisrouteeliminatestrafficsignals andshortensthedistancebetweentheislandcity&thesuburbs.Itwasmade availabletothegeneralpublicin2013andis16.9kilometreslong.
MMRDA: Most recent news
June 2, 2023
MMRDA wants to impose a tax on new construction along the Mumbai Metro Line 7
AccordingtoareportintheHindustanTimes,MMRDAhassubmittedaproposalto theurbandevelopmentdepartmenttoimposeatransit-orienteddevelopment (TOD)feeonpropertiesbeingbuiltwithin200metresofMumbaiMetroLine7.The MMRDAhasnotyetmadeadecisionabouttheTODfee.
May 18, 2023
MMRDA would pay Rs 2,900 crore to lease two BKC sites.
TwoplotsC13andC19intheG-BlockoftheBandra-KurlaComplex(BKC)areupfor leasing,andMMRDAisseekingbids.Theleasewilllastfor80years. Withthis agreement,theauthorityhopestoearnaboutRs2,900crore.
MMRDA plots will be available for rent
Nearby MMRDA offices
Bandra-Kurla Complex
MMRDAOfficeComplex, ComplexofBandra-Kurla, EBlockBandra(east),C-14&15, Mumbai-400051
Phone:+91-22-26594000
Faxno:+91-22-26591264
Thane
ThaneSub-RegionalOffice
Versatilehall
PokharanRoad,2ndFloor,NearOswalPark, Majiwada,No.2, Thane(west)-400601
Phone:+91-22-21712195
Faxno:+91-22-25418265
Kalyan
DivisionalOfficeofMMRDA, Ancientmunicipalbuilding, TilakChauk, WestKalyan
Phone:+91-0251-2200298
Office Cr-2
CR-2Building,InoxTheatre
9thFloor,OppositeBajajBhavan
NarimanPoint, Mumbai,India400021
Phone:+91-22-66157390
Faxno:+91-22-66157429
Wadala
WadalaTruckTerminal, BuildingA1,neartoanRTO
Wadala
Mumbai,India400037
Phone:+91-22-24062124
Faxno:+91-22-24036432
You’re looking for Projects in Bandra we have the Best Properties In Mumbai Like Ready to Move:https://navimumbaihouses.com/properties/search/bandra/
If you want daily property update details please follow us on Facebook Page / YouTube Channel / Twitter