Soon, Commuters Will Only Need 30 Minutes To Get From Mumbai Airport To Navi Mumbai Airport

Page 1

Soon commuters will only need 30 minutes to get from Mumbai airport to navi Mumbai airport

Inthenottoodistantfuture,thetripfromChhatrapatiShivajiMaharajInternational AirporttoNaviMumbaiAirportwilltakejust30minutesasopposedtothecurrent twohours.ActivitiesfortheconstructionoftheMumbaiairporttonavigatethe Mumbaiairportmetro8linehavebeenstartedbytheMumbaiMetropolitanRegion DevelopmentAuthority(MMRDA)&CIDICO.MMRDAandCIDICOwillshortly engageaprojectmanagementconsultanttohandletheconstructiononthisroughly 32km-longsection.

Are you searching for new projects in Byculla?

TheMumbaiairporttoNaviMumbaiairportmetrolinehasbeensuggestedasmetro 8inthe337kmmetroproject,accordingtotheMMRDA'scomprehensivetransport report.AfternaviMumbaiairportbecameoperational,therewasanincreasein trafficbetweenMumbaiandnaviMumbai,sothemetro8routefromMumbai airporttonaviMumbaiairportwassuggested.However,norealstepshavebeen takentoclearthewayuptothispoint.However,CIDICO&MMRDAhavebegunthe constructionofthisroute.

Mumbai airport to navi Mumbai airport details

The32km-longMumbaiportionofthisroadwillbebuiltbytheMMRDA,andthe naviMumbaiportionwillbebuiltbyCIDICO.Asaresult,theMMRDAcreateda comprehensiveprojectplanforthe10.1kilometresectionofMetro8thatrunsvia DelhiMetroRailCorporationfromMumbaiAirporttoMankhurd.Accordingto SanjayMukherjee,generaldirectorofCIDICO,CIDICOhaschosenUrbanmass transitbusinesstodeveloptheMankhurdtoNaviMumbaiairportphase.The followingfivemonthsareprobablywhenthisplanwillbefinished.Fortheworkof thisroute,CIDICOwillimmediatelyappointaprojectmanagementconsultant.

BytheendofDecember,theMMRDAwillprobablyhavehiredaproject managementconsultant.Inconclusion,thereisachancethatthemetro8routewill openshortly.ThenaviMumbaiairport'sfirstphaseisanticipatedtoopenin December2024.Inaccordancewiththis,CIDICOhasacceleratedtheprocessof layingthemetro8route.ThedistancebetweenMumbaiAirport&NaviMumbai Airportwillbeshortenedifthisrouteismadeoperational.

This is how the Metro 8 route will look.

 Thereareroughly32kilometresbetweentheMumbaiairportandtheNavi MumbaiairportMetro8line.

 SubterraneanmetrolinebetweenAndheriandGhatkopar;inthefuture,the linewillbeelevatedfromGhatkopartoMankhurd&beyond.

 PlamBeachwouldbeparalleltothehighwayfromMankhurdtothenavi Mumbaiairport.

 FromthenaviMumbaiairportterminalbuildingtotheMumbaiairport building,thiswillbeastraightroute.

 Thisroutemakesitpossibletotravelthe30-minutetripbetweenMumbai InternationalAirportandNaviMumbaiAirport.

 Therewillbeatwo-kilometerbridgeoverthecreekfortheMetrotopass throughVashiBay.

 Sevenmetrostationswillbecoveredbytheroute.

 Thepossibilityofa20-minutecycleandan80-90km/htopspeedforthe metro.

You’re looking for Projects in Vasai we have the Best Properties In Mumbai Like Ready to Move:https://navimumbaihouses.com/properties/search/vasai/

If you want daily property update details please follow us on Facebook Page / YouTube Channel / Twitter

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.