1 CONSTRUCTING ENVIRONMENT LOGBOOK
WEEK 7 DWTAILING STARTEGIES Activity: site visit This week, we will go off campus for a guided site visit with our tutor and project manager from the construction site.
Address: 45 Marne Street, South Yarra Typology: Multi-residential Builder: Hacer Architect: Powell and Glenn Architects (previously Alan Powell) Budget: 17 million Information of the site: this site has 4 floors
XUEHUI YANG
STUDENT No: 709889
2 CONSTRUCTING ENVIRONMENT LOGBOOK
Basement The underground floor is used as a car park. The roof is made of paper mash and clay.
The wall use shotcrete which is reinforced by conventional steel rods. Precast concrete slab with the steel in order to make the well stronger. Column- insute concrete
Ground floor This is the fire wood
XUEHUI YANG
STUDENT No: 709889
3 CONSTRUCTING ENVIRONMENT LOGBOOK
Glossary Drip: is used between surfaces to prevent water clinging to the underside of surfaces. Down pipes: a pipe that carries waste water or sewage away from buildings. Vapour barrier: resists diffusion of moisture through wall, ceiling and floor assemblies of buildings. Flashing: prevent the passage of water into a structure from a joint. Gutter: a narrow trough or duct which collects rainwater from the roof of a building and diverts it away from the structure, typically into a drain. Insulation: materials used to reduce the rate of heat transfer. Parapet: a barrier which is an extension of the wall at the edge of a roof, terrace, balcony, walkway or other structure. Sealant: a substance such as paint or polish that is painted onto a surface to protect it from other liquids from going into it, or is put in the space between two materials for the same reason
XUEHUI YANG
STUDENT No: 709889