![](https://assets.isu.pub/document-structure/210327065723-d181e8d2ab0c43f0266afc48dd0c5a1b/v1/141f0d08f53fab1b6825250c2e079c48.jpg?width=720&quality=85%2C50)
1 minute read
03 RE_PIT
THE DESIGN AND CONSTRUCTION OF THE CO-HOSING ARCHITECTURE
![](https://assets.isu.pub/document-structure/210327065723-d181e8d2ab0c43f0266afc48dd0c5a1b/v1/257223064eff776e7974789c1ad57bc9.jpg?width=720&quality=85%2C50)
Advertisement
Re_pit deals with the context and complexity of irregularly shaped site in a post-industrial area. The primary goal of our proposal is to retrace and reuse the features of the area of the site in a way that corresponds to the needs of the program through the following features:
•Permeability, introducing enhanced visual communication across urban, public residenial scales through the architectural form of the project; •Individuality, form that reflect the function and varying typologies of the living spaces •Organic shapes, aimed to break the monotonous repetitions of the surrounding.
ARCHITECTURE DESIGN
FROM MARCH,2019 TO JUNE,2019 LOCATION: TORIN
GROUP WORK WITH ANTON KRASSA, YINGYUE LI, LUCIA SANNA ROLE IN TEAM: CONCEPT AND DESIGN(75%), TECHNICAL DRAWINGS(60%), DIAGRAMS(100%),CONSTRUCTION DETAILS(50%_ME, 50%_YINGYUE LI)
![](https://assets.isu.pub/document-structure/210327065723-d181e8d2ab0c43f0266afc48dd0c5a1b/v1/5b5787d21d5d27d2ca22e30b48f6c944.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/210327065723-d181e8d2ab0c43f0266afc48dd0c5a1b/v1/6f12601489ffbe884b8e5d72b1d00530.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/210327065723-d181e8d2ab0c43f0266afc48dd0c5a1b/v1/4cda4b41117af9c36c054d0cbe21a0bb.jpg?width=720&quality=85%2C50)