Architecture Portfolio | Yashash Kanojia

Page 1

Academic Portfolio M.Arch Masters in Architecture Design CEPT University Ahmedabad, Gujarat B.Arch IAPNU, Nirma University Ahmedabad, Gujarat

Yashash Kanojia


STUDIO PROJECTS- Postgraduation Foundation Studio Poetic of Constructions Monsoon 2020 (Sankalpa)

Sem 2 Vertical Living

Spring 2021 (Dhaval Gajjar, Jagrut Patel)

Sem 3 Towards a Critical Project and a Project of Criticism : Capitol Complex Chandigarh

Monsoon 2021

(Kevin Low, Shubhra Raje)

YASHASH KANOJIA PROFILE D.O.B 03.02.1997 Address D2/186, Kidwai Nagar West, Delhi - 110023, India Email yashash.pad20407@cept.ac.in yashashkanojia97@gmail.com Phone +91 9537838180 Nationality Indian Languages English, Hindi

I have always been a curious student. This habbit of mine helped me a lot in architecture as it paved a path to answer the unanswered WHY’s of my mind and also unlock new horizons. It took me to the path of unconventional methods which fascinated me and inspired me to create new, exciting and different design ideas.

PROFICIENCY AutoCad Adobe Indesign Adobe Photoshop Sketchup Revit Rhinoceros Microsoft Office Lumion

Sem 4 Architecture of Urban Node Spring 2022 (Rajiv Kadam)

EDUCATION Postgraduation M.Arch (ongoing-4th sem) 2020-2022 Masters in Architecture Design CEPT University, Ahmedabad, Gujarat Undergraduation B.Arch 2015-2020 Institute of Architecture and Planning, Nirma University, Ahmedabad, Gujarat PPI - 8.93 Secondary Education 2015 2013

N.K.Bagrodia Public School, Sector-9, Delhi C.B.S.E XII Board 92% C.B.S.E X Board 9.8 CGPA

STUDIO PROJECTS- Undergraduation Research Thesis Strategies For Improving Thermal Sem X ,2020 Comfort in Office Buildings in Composite Climate Design Thesis Ambedkar University Campus Sem IX, 2019 Design, Delhi Urban Insert Market Place, Shilaj, Ahmedabad Sem VII, 2018

Urban Form Business Hub, Ashram Road, Sem VI, 2018 Ahmedabad Institution School of Design, Nirma University, Sem V, 2017 Ahmedabad Housing Low Cost Cluster Dwellings, Vanakbara, Diu

Sem IV, 2016

Residence Atilier Residence, Lilapur, Ahmedabad

Sem III, 2016

ACHIEVEMENTS 2015-2020 Nirma University Scholarship 100% Merit Based scholarship for five years College Annual Consistence Performance Awards 2020 in Fifth Year 2019-2020 College Annual Best Studio Performance Awards 2019 in Fourth Year 2018-2019 College Annual Best Studio Performance Awards 2018 in Third Year 2017-2018 College Annual Consistent Performance Awards 2018 in Third Year 2017-2018 College Annual Consistent Performance Awards 2017 in Second Year 2016-2017

WORK EXPERIENCE Internship Sikka Associates and Architects, Dec 2018 - SAA, Delhi May 2019 Pr. Architect - Ar. Raman Sikka Projects Undertaken - Ramprastha Housing, Gurugram - Hyundai Corporate Office, Gurugram - ISGEC Head Office, Noida - Sarvottam Golden Township, Noida - KLJ Infotech Park, G.Noida

STUDY TRIPS Central Europe Architectural Visit, Jul 2017 Prague, Bratislava, Berlin, Dresden, Vienna

Jodhpur Documentation, Jan 2017 Documentation of Vernacular Architecture

Bhutan Architectural Visit, Jun 2016 Understanding Traditional Architecture

Vanakbara, Diu Documentation, Jan 2016 Documentation of Vernacular Architecture

Short Documentary Film

- Rang Roghun, Kite making in Ahmedabad, Jan 2018 - Musafir, The Journey Through Europe, Jun 2017

WORKSHOPS Photography Course Under guidance of Prof. Parmanand Dalwadi

Roofing System Construction Doubly Curved Funicular Shell, Dome etc.

Brick Masonry Workshop Understanding brick bonds, openings and making arches

Clay Workshop

Making small sculptures with terracota and ceramic clay

Furniture Design

Designed furniture for underprivileged kids

Calligraphy, Stylization and Typography Under guidance of Dr.Santosh Kshirsagar as part of Winter School Cept 2021

2


Selected Works

Page No.

Revitalising The Urban Core - Case of Rohini, Delhi

03

Masters in Architecture CEPT | MAAD Monsoon 2020

The Social District

Urban Covalence of Vertical Living - Ashram Road, Ahmedabad

14

Masters in Architecture CEPT | MAAD Spring 2021

Park of Reconciliation

Chandigarh Capitol Complex

21

Masters in Architecture CEPT | MAAD Monsoon 2021

Ambedkar University Campus Design Rohini, Delhi

27

Bachelors Design Thesis IAPNU, Nirma University 2019

Marketplace Bazaar Design Urban Insert Shilaj, Ahmedabad

32

Urban Design Studio IAPNU, Nirma University 2018

Office Training Projects

STRUCTURAL

E MAIL : - ssaabb@vsnl.com NEW DELHI

OWNER

114, Sector-44, Gurgaon.

GROUP HOUSING, SECTIOR-37 D GURGAON

PROJECT ARCHITECT

TEL : - 98100 56948

Ramprastha Promoters & Developers Pvt. Ltd.

SIKKA ASSOCIATES ARCHITECTS

URBAN DESIGN | MASTERPLAN | ARCHITECTURE | INTERIORS | ENGINEERING | PROJECT MANAGEMENT

A: A-2/1, AFRICA AVENUE, SAFDARJUNG ENCLAVE, NEW DELHI, INDIA 110 029 T: +91.11.4323.5235 | F: +91.11.2629.4481 | E: saa@saaindia.net | W: www.saaindia.net

SEAL

ISSUED FOR

INFORMATION & REVIEW TENDER SUBMISSION GFC AS BUILT

1:50

SCALE DATE ISSUED

08.02.2019 YASHASH

CHECKED BY

SUMIT JAIN

CLUBHOUSE RENDERED VIEW PLOT -A (PRIMERA )

471

DWG NO.

DRAWING TITLE

DRAWN BY

DWG NO.

2018

35

PLUMBING & FF CONSULATANTS

At Sikka Associates Architects Delhi

RP/CL/02

3


Masters in Architecture CEPT | MAAD Monsoon 2020 By placing an Urban Marketplace in the middle of the high density and populated zone in Rohini, Delhi, this project aims to increase the intensity and diversity of human interactions in the city through sports as a catalyst. All the sports arenas are proposed within the context of commercial hub, the aim is to provide safety to these areas within a healthy social interactive environment in conjunction with a market, and rentable office spaces and green outdoor open spaces. The focus is really on designing the circulation, open spaces, plazas and streets acting cohesively and letting the users meander through the space and pausing at specific areas placed strategically.

Tutor - Sankalpa

Revitalising The Urban Core Sports as a Catalyst bringing people together - Case of Rohini, Delhi

4


Reading, Questioning, Interpreting an Architectural Response Problematising the Context : Problem Statement : A good public space is one that reflects diversity and encourages people to live together effortlessly, creating the necessary conditions for permanence, which invites people to be on the street. It is the vivacity of spaces that attracts people. It is the ultimate paradox that on one hand architecture contains elements which can make a space chaotic and equally a vibrant one. Throughout the environment there are pockets of spaces that deter the opportunity of social interaction, these

spaces are the dead spaces which gradually evolves. As we meander through the streets of Rohini in Delhi, we encounter dead streets hardly used by any pedestrian. People prefer walking on the road rather than the sidewalk. There is a presence of huge lifeless periphery wall on one side and dense canopy on top of it which makes the sidewalk a semi-closed space with a dark and dingy experience discouraging people to use it. This

boundary wall adds to the disconnect between the internal gated community to the outside streets. Another daunting issue is of the clustering of marketplace which is the only public centred space where all the interaction and activities happen. Accumulation of all the activities at one centre makes this place more chaotic and are faced by challenges like noise pollution and lack of parking spots with the everlasting issue of safety. The prime concern which arises in this area is firstly, How can architecture intervene to convert the chaotic spaces into vibrant one and the dead streets to a more lively street? And secondly, How can we solve the existing issue of lack of open spaces and bring people together in a safe environment? MAPPING THE NUMBER OF PEOPLE USING A SPACE (This shows the destination of any function/activity happening)

Trees

Road Network

Parks and Open Spaces

Market Complex

Vehicular Parking

Design Program : Revitalising the Urban Core

Sports as a Catalyst bringing people together By placing an Urban Marketplace in the middle of the high density and populated zone in Rohini Delhi, this project aims to increase the intensity and diversity of human interactions in the city through sports as a catalyst. By placing all the sports arenas within the context of commercial hub, the aim is to provide safety to these areas where a healthy social interactive environment in conjunction with a market, and rentable

Morning Afternoon Evening

Dead Streets and Blank Boundary Walls

Afternoon

Evening

office spaces and green outdoor open spaces. The focus is really on designing the circulation, open spaces and streets rather than the individual shops, some of the multifunctional area is designed for the tenants to customise and transform as they want. The social incubator is defined architecturally, not by façades that communicate an appearance,

but rather by the spaces forcing the meandering of the users and pausing at strategic location. This floor also becomes the site for social interaction, and different usages of shops and sports facilities and de-central zoning becomes a social hub for the same. Socialisation is seen as central to the exchange of ideas and making contact with new people.

Architectural Interventions • • • • • • • • • • • • •

Morning

Borders and Boundaries

Badminton Court Kids Play Area Table Tennis Room Squash Room Basketball/ Handball Court Shops Outdoor Yoga/ Karate Space Multi-purpose Hall Restaurant Pool Room Air Hockey, Foosball Carrom/ Chess Room Office Spaces

MARKETPLACE

PUBLIC SPACE

SPORTS

5


Space material and Interaction

Conceptual Diagram This modelling exercise was to create an enclosure system with the use of different kind of materials to express the characteristics of a system in relation to the space of the project. The contrast between light and material and in its texture what is the prime objectives. And factors like the ability of the material to draw in or restrict light was taken into consideration.

Design strategy:The concept of this design is to give sports and physical activities the prime importance, for which all the major sports arenas and courts are lined up on one side and retail shops.

Shops

This provides pedestrian movement across the side giving them views of both. These sports arenas have been strategically placed so as to provide pause points at regular intervals. Further these sports interaction have been lined up till third floor with open terraces and all the commercial offices are placed above them.

Process of Articulation of Form and Spaces

This was the first time where a model was made to communicate the design strategy of the project and its tentative expression. The outcome of this was to create an expression of space as an interaction of its physical elements. The visual exposure and the opaqueness had to be taken into consideration.

Iteration-1

The ground floor has been kept fully opened without any link between in and out which is an architectural move to increase interaction amongst people. Further articulation in the form has been done on the above upper floors so as to provide informal outdoor office gathering space. And a rooftop restaurant is placed at the top.

Sports Arenas

Yoga Area

In the design the prime importance was given to the badminton and basketball court which were the driving factor in the design. The parallel access through the market was another important feature giving linear shops and pedestrian movement. These modules were articulated on the above floors and overlooking Spaces were created. A transparent and opaque for running parallel was strategically placed keeping in mind the views.

Cafe

Final Iteration with respect to context

Isometric Views of Model

Rooftop Restaurant

The site is a 2800 m² land located in the commercial complex zone near DC Chowk in sector 9, Rohini, Delhi. The overall context is surrounded by residential Group housing societies. This complex provides as the amenities area and shopping complex.

Informal Outdoor Space

Informal Outdoor Spaces

6


STRUCTURAL MODEULE Accommodating Structure

Column To Beam Assembly - Exploded Isometric View 150mm thk Concrete Slab

11 Steel Reinforcement

3

11

9

3

10

4 Perforated Decking Sheet

9 10

12 15

Secondary Beam

8

13

5

9

7

10 Spanning System

6

2

14 1

Peripheral Beams LEGENDS:

Gusset Plate for Joinery

1. 150x200 mm weather coated timber infill up to height of beam bottom screwed to the MS section bracket 2. 15 mm C section bracket 3. Joinery Assembly made of 15 mm MS plate 4. 12 mm steel plate with turnbuckle for tensile cable 5. 30 mm MS tie rod

6. 75x150 mm cross laminated timber section beam 7. 6 mm dia tension cable 8. Adjustable clevis and yoke end connecting tie rods 9. 10 mm MS inverted T section 10. 50x150 mm cross laminated timber beam section

11. MS plate welded on top and bottom which acts as a connector between 2 columns 12. Turnbuckle holding 6mm tension cable 13. 15mm MS bracket bolted on column assembly , MS plate (11) will be welded on it 14. 270x165 mm intermediate connector (15mm thk I section) bolted on column 15. 15mm MS plate bolted to timber section

Structural Module Bearing System

Exploded Isometric View of System Accommodating Structure

Isometric View

Plan

Section

7


Column Assembly -Bearing System

Column to Beam Assembly - End Condition

1

4 3

5

4 2 6

1

7

2 9

2 8

7 3 1 3

LEGEND

9

1. 2. 3. 4. 5.

6 7

8

2

6. 7. 8. 9.

110x150 composite peripheral beam 100x200 CLT spanning member 50x75mm secondary timber beam 30mm thk MS tie rod Ajustable clevis and yoke end connecting tie rods welded to 12mm thk steel plate 6mm dia tension cable 50x75x10mm ‘L’ MS plate 230x165mm composite column Joinery assembly made of 12mm MS plate

6

1

1

Peripheral Beam Assembly LEGENDS:

3 4

Top view

1. 150x200 mm weather coated timber infill up to height of beam bottom screwed to the MS section bracket 2. 15 mm C section bracket 3. 10 mm MS inverted T section 4. 50x150 mm CLT timber beam section 5. 15mm MS bracket bolted on column assembly , MS plate (11) will be welded on it 6. 270x165 mm intermediate connector (15mm thk I section) bolted on column 7. Bolts

Front View Model Views showing spanning and bearing system module

Side View

8


Floor Plans

3

7

4

2

1

7

5

6

LEGEND

3 4

3

8 1

6

5

8

3 7

9

8

2

8

3

10 9

9

7

11

First Floor Plan

1. Outdoor Reading Space 2. Library 3. Staircase 4. Table Tennis Room 5. Squash Room Below 6. Basketball/ Handball Court Below 7. Outdoor Yoga/ Karate Space 8. Lifts 9. Shops 10. Mens Washroom 11. Womens Washroom

10

8

9

8

9

9

7 11

Ground Floor Plan 0 1 2

5

2

1

3

4

10m

LEGEND The ground floor is kept strategically open to let all the activities happen at the same space. The prime design strategy is to blur the boundaries between inside and outside. Complete STRUCTURAL SYSTEM floor plate 01. behaves as a one large social space - to activate the ground floor plate and make the place more lively. Sports courts like badminton,

squash, table tennis and basketball are placed here with double height arenas. Kids play area is kept in the middle surrounded by other activities. Linear access is given through the site creating a walking street. The user have different experiences while walking and meandering to the public setting space and the public open plazas.

LEGEND

1. Badminton Court 2. Kids Play Area 3. Staircase 4. Table Tennis Room Revitalizing the Urban Core 5. Squash Room 6. Basketball/ Handball Court 7. Outdoor Seating 8. Lifts 9. Shops 10. Mens Washroom Second 11. Womens Washroom

8

9

8

10 5

8

6

7

11

1. Billiards Room 2. Multipurpose Hall 3. Restaurant 4. Outdoor Seating 5. Pool Room 6. Air Hockey, Foosball 7. Carrom/ Chess Room 8. Lifts 9. Staircase 10. Mens Washroom 11. Womens Washroom

Floor Plan

Revitalizing the Urban Core

DN

1

DN DN

DN DNDNUPUP UP

LEGEND

STRUCTURAL GRID PLAN FOUNDATION STUDIO | MAAD | CEPT UNIVERSITY

Structural Grid Plan and Section

Two spans of structural grids are 2 followed, 8m span grid has a depth of 2 600mmSECTION for spanning members and 15m span grid has a depth of 900mm 2 KANOJIA (PAD20407) for the spanning members. YASHASH Service course which includes staircase lift and wash-rooms are kept in RCC frame Third Floor Plan structure.

3

10 4

5

5 11

1. Open Floor Office Space 2. Lifts 3. Staircase 4. Waiting Room 5. Conference Room 6. Mens Washroom 7. Womens Washroom

0 1 2

5

10m

9


View from West Side

Building Section AA

10


Wall Section Vertical Bi-fold Window 18mm Flooring Tiles 150 thk concrete slab 4mm thk decking sheet 160x100 aluminum window frame Column in elevation 12mm thk fixed glass pane

75x150mm CLT beam 15mm thk aluminum cladding 160x170x10mm thk MS capping Peripheral composite beam Turnbuckle Spanning system Interior View showing the game room where people playing snooker. The ceiling is seen with structural spanning system and decking sheet over it.

Sectional Perspective of Pool Area showing the structural spanning system and the vertical bi-fold shading system on the west facade with fixed double glazed window

Sectional Perspective of an Office area showing typical usage of space with bookshelf being created within the column space.

11


Modifying - Detailing the window

Shop Drawings 50

Introduction

500

28 11

17

250

50

28

17

222

9 9

6

30 2

7

2

20

7

LEGEND 1. PULLEY 30 MM Ø WITH 2 CHANNELS 2. PULLEY 20 MM Ø 3. PULLEY 12 MM Ø 4. 50X50 MM L SECTION (5MM THK) 5. 500X350 MM MDF SHUTTER (8MM THK) 6. 10 MM INCLINED SLOT ACTING AS A CHANNEL GUIDE FOR ROTATION 7. STAINLESS STELL HINGES 8. PULLEY FOR WINDING THE CABLE WITH HANDLE 9. STAINLESS STEEL BOLTED L CLAMP FOR GUIDE

4

8

Plan

25

7

1 3

3

The vertical Bi-Fold Window is designed for an opening size of 500x700mm, it is hand operated where input is given through a winder which is attached to a pulley. The working 5 mechanism includes5combination 16 29 of pulleys around which metal wire runs and pulls up the entire set of shutter when winded around, converting the rotational motion to translational movement.

5

7

7

D

2

3

1

46

5

1

C

Operation Type - Vertical Bifold 1 Material - MS Frame, MDF Shutter Opening Size - 500 x 700 mm Operation - Hand Operated through pulley with winder & handle

6

7

B

1

20

50

18

Description

20

8

45 1

1.2 BACK VIEW

46

1.1 FRONT VIEW

18

6

700

The working mechanism includes combination of pulleys around which metal wire runs and pulls up the entire set of shutter when winded around, converting the rotational motion to translational movement.

1 3

5

The vertical Bi-Fold Window is designed for an opening size of 500x700mm, it folds up from central axis with a hinge joint on top. It is hand operated where input is given through a winder at the bottom which is attached to a pulley mechanism.

25

2

50

4

25

1 3

Operation Type - Vertical Bi-fold Material - MS Frame, MDF Shutter Opening Size - 500 x 700 mm Operation - Hand Operated through pulley with winder & handle

20

A

6

LEGENDS:

1. Pulley 30 Mm Ø With 2 Channels 2. Pulley 20 Mm Ø 3. Pulley 12 Mm Ø 4. 50x50 Mm L Section (5mm Thk) 5. 500x350 Mm Mdf Shutter (8mm Thk)

28

250

5

16

5

28

3 7

Elevation E1

LEGENDS:

1. Pulley 30 Mm Ø With 2 Channels 2. Pulley 20 Mm Ø 3. Pulley 12 Mm Ø 4. 50x50 Mm L Section (5mm Thk) 5. 500x350 Mm Mdf Shutter (8mm Thk)

30 1

1

C

D

1

1

7

7

2

2

20

45

18 6

46

700

29

1 3

20

5

5 28

1

25

16

6. 10 Mm Inclined Slot Acting As A Channel Guide For Rotation 7. Stainless Steel Hinges 8. Pulley For Winding The Cable With Handle 9. Stainless Steel Bolted L Clamp For Guide

20

6

5

Elevation E3

25 3

3

20

Details

2

3

50

20

25 20

Elevation E2

29

50

25 Grasshopper Scripting

2

2

17

222

20

A An isometric drawing depicting movement of a Vertical Bi-fold Window 25

7

50

8

8

8

20

28 11

500

1

50

D

1

50

C

1

2

3

1

25

17

18

17

222

4

30 1

20

46 50

46

28

50

18

B

20

3

1

50

20

25 25

B

500

A

Movement

20

3

6. 10 Mm Inclined Slot Acting As A Channel Guide For Rotation 7. Stainless Steel Hinges 50 8. Pulley For Winding The Cable With Handle 28 17 250 9. Stainless Steel Bolted11L Clamp For Guide

3

4

Parametric scripting to model Vertical Bi-fold Window

Detail A

Detail B

Shop drawings of Vertical Bi-fold Window 45

Detail C

Detail D

12

5

28


Parts and Components

Mechanism - Movement The first diagram depicts the rotation of pulleys movement, where the complete weight of the shutter is pulled from the central axis. Through the iteration, the pull force mechanism is achieved to be taken from the centre.

1 Stainless Steel Pulley with 2 channels, 30mm Internal Dia, 40mm Outer Dia with 2mm Thk steel L Bracket Bolted with Nut & Bolt

5 MDF- 8 mm Thk 2 Shutters - 500x350mm each

2 Stainless Steel Pulley, 20mm Internal Dia, 30mm Outer Dia with 2mm Thk steel L Bracket Bolted with Nut & Bolt

6 Bolted L Clamp for Guide 2mm Thk Stainless Steel

3 Stainless Steel Pulley, 12mm Internal Dia, 18mm Outer Dia with 2mm Thk steel L Bracket Bolted with Nut & Bolt

7 Hinge - 36 X 36 mm 2mm THK Stainless Steel

8 Pulley with Wire Winder With Attached Handle 30mm Int Dia

4 MS L Section Frame (50 X 50 mm) - 5mm Thk

The other diagram depicts the two set of wires for pulling from both the ends. Equal length of wires ensure winding at same time, removing time lag and hence eliminating the fact of swaying from one end due to torsion. Equal length is managed by varying pulley diameter sizes and placement variation.

9 Stainless Steel Wire 1mm Thk for Pulley System

Various Parts and Components of Vertical Bi-fold Window

A drawing depicting mechanism of Vertical Bi-fold Window

Assembly

Process Models

0

228

C

A

Detail A

D

Detail B B

Isometric View

MS Frame Assembly 50x50mm MS L Section 5 mm thk - to be welded

Detail C

Drawings depicting Assembly Diagram of Vertical Bi-fold Window

Detail D

Illustration depicting process models of Vertical Bi-fold Window

FOUNDATION STUDIO | ARCHITECTURAL DESIGN MONSOON 2020 | CEPT UNIVERSITY

2.3 MOVEMENT- REVIEW 03 - VERTICAL BIFOLD WINDOW 03.09.20

13

YASHASH KANOJIA

PAD20407


Masters in Architecture CEPT | MAAD Spring 2021 The project aims at creating a social district at an urban level with the covalence of public realm. Integrating residential and commercial use whilst creating both public and private streets is the key focus of the project. A well-structured transition of formal dense arcade retail shopping street to a more organic open trail towards the riverfront is achieved. The project attempts to create a journey of an array of experiences at regular intervals while living in a high-density CBD of Ashram Road. Finally catering to the growing housing needs, the future of vertical living is explored keeping in mind the demographics of current scenario of Ashram Road.

Tutor - Dhaval Gajjar, Jagrut Patel

The Social District

Urban Covalence of Vertical Living Ashram Road, Ahmedabad

14


Program

First Impressions

TYPOLOGY

SPATIAL QUALITY

USER GROUP

ORGANISATION

Initial ideas indicative of commercial street running at lower levels, while residences being on upper levels. The free commercial ground space interacting with voids and sunks leading to a public realm at urban scale.

15 12


Site Plan

2 3

2

3 3

1 2

4

4 10

1

4. PUBLIC SUNKEN PLAZA

2

1. Retail Shops 2. Restaurant 3. Covered Seating 4. Steps for plaza

8

Part Plan at Basement Level

4

0

2.5

5

15m

6

2

5. PRIVATE SUNKEN PLAZA- AMENITIES/ CLUBHOUSE

8 9

11

1. Library 2. Multipurpose Hall 3. Sauna/Spa 4. Conference 5. Meeting Hall 6. Gym 7. Indoor Sports 8. Cafe/ Restaurant 9. Womens Washroom 10. Mens Washroom

7

3

5

Part Plan at Basement Level

2 12

0

2.5

5

15m

13

9

3 9

14

Ground Floor Plan 0

The ground floor plan blurs the boundary between commercial and residential and behaves as an intermediate space. There is an coexistence of public and private rails leading you to different experiential journeys while just meandering though the retail shops. The overall site plan becomes the most happening urban space in

the city context where people are attracted with the connect and belongingness to the site which eventually opens up to the beautiful Riverfront view. The ground floor plan has all the commercial activities and the parking happening within the residential complex while all the living happens above.

LEGEND

1. Commercial Complex 2. Retail Shops 3. Public Plaza 4. Public Sunken Retail plaza 5. Private Amenities/ Subken Clubhouse 6. childrens Play Area

5

10

N

25m

7. Formal Garden 8. Landscape Mounds 9. Stilt Car Parking 10. Tower A 11. Tower B 12. Tower C 13. Tower D 14. Entrance

Typical Floor Plan

0

25m

16


Cluster Plans

Unit plans

Block A

1 BHK

Block B 2 BHK

Block D

3 BHK

1 BHK

Block A 2 BHK

Block B BHK 31 BHK

Block D Block A

2 BHK

Block B Block D

3 BHK

A

B N 0

2.5

5

12.5m

D 0

1

2

5m

17 19


Street Urbanism

Street Urbanism

The site has been proposed with three walking trails giving a different experiences from public in formal to a public formal to a private street. Major nodes have been identified and strategically designed according to the time which would be spent by the people at that particular point. The overall character gradation can be seen from a formal arcade retail shopping street to a more organic form achieved at the riveredge. In all the 3 trails, the journey comprises of different experiences at regular interval, where you come from a claustrophobic high density area to an open riverfront view. The chart shows the overall design efficiency of the scheme comprising of 3 different stakeholdersconsumer, producer and the influencer. The project works good on overall contextual responsiveness and the site efficiencies also. A good social sustainability is achieved through creation of a public realm both at site and cluster level. It works good on Economic and Environmental Sustainability as well but lacks a bit on efficiency of Dwelling Unit. Overall provision of Essential Facilities and safety have been taken care of and efficiency in terms of material, water, energy conservation are considered. 18


Sectional Persepective Urban Edge

Private Space

Larger Open Area

Riverfront View

Commercial Complex Ground Floor Plan

Sectional Blow Up

19 18


20


Masters in Architecture CEPT | MAAD Monsoon 2021 The project questions the existing physical separation of citizens from governance, in the capital complex, marked through an orchestrated movement dictated by the existing buildings and installations, and aims at ‘reconciling’ the public, governance and the proposed ensem- ble of learning through the introduction of the great park. The project thus uses ‘landscape’ as a tool to hold the fragmented functions to- gether. The Park is perceived as a space for gathering and exchange. It is an arena for civic responsibility and leisure - a primary domain of the university and public buildings in the weekdays, and over weekends it serves as a domain for all. The Park of reconciliation acts as a glue, that binds the proposed en- semble of learning and governance. It acts as a framework by which relationships of responsibility are held in place. Subtle gestures in the landscape allows for possibilities and chance encounters facilitating debates and discussions amongst the various users.

Park of Reconciliation

Chandigarh Capitol Complex

Tutor - Kewin Low, Shubhra Raje

21


Symbolic Fortification

Disintegration of public

Public engagement

This plan illustrates the fortified position of the capitol complex with buffer zones cutting off the civilizational growth from the entire grid and separating the complex with limited entry points. Does this vision of positioning the capital complex at the foothill of Shivalik range symbolise dominance over the public ?

Proposed Section

open hand

raised plaza path of consequence

agora

geometric hill great steps

Existing Section

existing mounds retained

existing mounds

Hence, the addition of a park within the complex which bridges the gap and reduces the separation between the government and the public. It eliminate the disconnect existing within the landscape of the complex and imagines the great park as a glue.

22


Eliminating the internal vehicular roads

Removal of concrete plaza

Removal of Geometric Hill

Addition of park boulevard and sensorial trials

Merging the 2 separate levels

Adding Great steps taking elevating up to the plaza

Peripheral vehicular circulation and car park

Addition of Path of Consequence

The Park of reconciliation 23


Park toilet

Meandering through the sensorial trail, one is encountered with filtered views of rows of bamboo shoots hinting a sense of enclosure.

roof lifted by 450mm to facilitate cross ventilation

Shaded under the trees, the architecture of the park toilet is reduced to varying degrees of bamboo walls depending on the degree of privatization required.

concrete basins

SECTION AA

degree 02 bamboo wall degree 03 bamboo wall concrete basins

degree 01 bamboo wall

ELEVATION

SECTION BB

degree 03 bamboo wall

degree 02 bamboo wall

stone flooring

brick flooring

concrete basins

degree 01 bamboo wall

24


Park boulevard

Trash can

2500

spacing between the concrete paver blocks re articulated to visually demarcate the track for cyclists bollards

6000

park bench (resting spaces) egresses into the landscape demarcating spots for vendors

FRONT ELEVATION

SIDE ELEVATION

2000

The trash cans consists of a perforated SS bin pivoted to a concrete outer shell. The pivot facilitates easy removal of waste while the concrete shell protects the garbage from rain/ animals etc. PLAN

Park bench up-lighters

resting space

trash cans

concrete pavers

bollards

cycle track

park lights

clearance for rainwater to drain out

clearance for rainwater to drain out removable back rest downlighter

FRONT ELEVATION

SIDE ELEVATION

2000mm

750mm

SECTION (5-7pm) - highlighting the park as a domain for public in the evenings

PLAN

25


Ecological Corridor

Boulevard Caregivers Resting Area

Mesial Path

Park Toilet

Point of Confluence

Animal Dispensary

Primary Trail

Secondary Trail

Park Toilet

Flooring pattern

A

Woodland Park

Marginally Centralised Activities Communal Tables, Rainwater Sheds, Public Utility Areas, WC, Drinking Water, Refreshments

Decentralised Activities Forest Gazing, Pet Water Spout Spots, Meditation Decks, Yoga Pavilion, Bird Feeder

22nd dec (6:00am)

Sequestered Wilderness

This zone lies at the threshold of the city and governance. The zone consists of artificial mounds which were proposed by the architect in order to cut off the complex from the city. Hence in an attempt to link the complex with the city, the threshold is envisioned as an opportunity to bridge the gap and bring people in. B

DETAIL ‘A’

Sensorial trails have been carefully curated for the visitors offering them a magnitude of experiences such as forest gazing, contemplation/ meditation, fitness plazas etc. These activities have been inserted after studying the spatial character of the rooms created by the trees.

DETAIL ‘B’

26


Bachelors Design Thesis IAPNU, Nirma University 2019 A master plan for the new campus for Ambedkar University in Rohini Sector-3, Delhi for 2500 students is prepared and then detailing out of academic cluster, admin, library, auditorium is done. . The total plot area is 7.3 hectares divided by a 13.5m wide tertiary road cutting the site almost from Centre. Mandated to focus on research and teaching in the social sciences and humanities and guided by Dr Ambedkar’s vision of bridging equality and social justice with excellence, this university is designed by considering following featuresA multicampus –humanities and Social Sciences University, Non hierarchal like unity atmosphere ,Campus for team work and creativity needs for marginal section of society, Space for collective engagement allowing informal, spontaneous & chance encounters, Open & networked classrooms to provide flexibility through multiple spatial configurations, Diverse set of clusters with own identity and character expressed through varied built & open spaces, Diverse set of social spaces allowing intellectual & emotional stimulation , Multiple efficient and flexible use of space.

Ambedkar University Campus Design Rohini, Delhi

27


28


LEGEND 1. PRIMARY ENTRY 2. ENTRY COURT 3. ADMIN BLOCK 4. FACULTY BLOCK 5. AMBEDKAR MUSEUM 6. AUDITORIUM & LIBRARY 7. CANTEEN 8. ACADEMIC CLUSTER 1 9. ACADEMIC CLUSTER 2

PUBLIC TO PRIVATE

10. SERVICE ENTRY 11. ENTRY FOR RESIDENTIAL WING 12. FACULTY RESIDENCE 13. DIRECTORS RESIDENCE 14. OUTDOOR SPORTS 15. HEALTH CENTRE 16. GIRLS HOSTEL 17. BOYS HOSTEL 18. DINING HALL

OPEN COURTS - HIERARCHY

KNOWLEDGE AT JUNCTION- LIBRARY

SITE PLAN MASSING- BUILT UP

ZONING

LONGITUDINAL SECTION

29


SITE MODEL

Outdoor Sports

Academic Cluster

Faculty Residence Health Centre

Mess

Canteen Girls Hostel Boys Hostel Admin Block Auditorium & Library Faculty Block 30


ELEVATION C

` SECTION AA

SECTION BB A

D

B

B

C VIEW D

A

G.F. PLAN 31


Urban Design Studio IAPNU, Nirma University 2018 The project started with development plan in Shilaj area lying in outskirts of Ahmedabad, where master plan was made with key factor being refill of Shilaj Lake from rainwater and drainage. Overall a green belt was provided acting as water downpour into the lake. In the second part, a prestigious commercial public market place was designed which aimed to engage city and its citizens with more interactive places. The market would facilitate retail shops and commercial spaces. Exploration of volume is done while creating overlooking corridors and terraces. The market place becomes the urban center with streets running along it creating an access within.

Marketplace Bazaar Design Urban Insert Shilaj, Ahmedabad

32


PRIMARY STREET WITH METRO

SECONDARY STREET

MASTER SITE PLAN

TERTIARY STREET

CONTOURS

RIDGE LINE

CONNECTIONS

LAKE REFILL

CYCLING TRACK

GREEN BELT

ISOMETRIC VIEW

33


A

A

MASSING

VOIDS

CONNECTIONS

OPEN TERRACES

SERVICES

STRUCTURE

G.F. PLAN

SECTION AA 34


Office Training Sikka Associates and Architects 2018-19 Sarvottam Golden is a multidiscipline township of greater Noida west. Spread across an area of 10 ha, it is a mixed land use project with IT offices, retail spaces, corporate suites and residential apartments. Submission stage drawings prepared for ID towers and residential blocks, site plan, landscaping plan. Online submission doing prepared and smart DCR software Other projects worked on is Ramprastha housing. GFC drawings prepared for the basement coordinated plans, sections, parking plan, electric substation detail, STP detail, security guard room detail, elevations. Clubhouse details prepared for the same which included plans, sections, elevations, door window details, swimming pool details, OHT, staircase details

Principle Architect - Ar. Raman Sikka Worked Under - Ar. Sumit Jain

Office Training

SAA - Sikka Associates and Architects Delhi

35


NOTES:1. ALL BUILDING EXCLUDING BASEMENTS FULLY AIR CONDITIONED AS PER N.B.C. NORMS. 2. ALL BUILDING FULLY SPRINLERED AS PER N.B.C. NORMS.

45M WIDE ROAD

EXIT ENTRY 6.00 M WIDE GATE

EXIT

404,570

45M WIDE ROAD

EXIT

EXIT ENTRY

6.00 M WIDE GATE

GUARD ROOM

LVL +300

12.00M WIDE ROAD (+300 MM)

LOWER GROUND LVL

LVL -2200

6.00 M WIDE GATE

LVL +1800

LVL +300

BLOCK - B

BLOCK - C UP

LVL +1800

TOC +26800)

LVL +300

SUNKEN COURT BELOW

SUNKEN COURT BELOW

LVL -2200

LVL -2200

LVL -2200

LVL +1800

TERRACE

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

H1

T E R R A C E

TERRACE (TOC +29800)

G+16

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE

TERRACE

(TOC +26750)

TERRACE (TOC +29800)

BLOCK - B1

TERRACE BELOW (TOC +23750)

(UG+4)

TERRACE

(TOC +26750)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE

(TOC +26750)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE

(TOC +26750)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE

(TOC +26750)

(TOC +26750)

TERRACE (TOC +29800)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

BLOCK - B2

TERRACE BELOW (TOC +23750)

TERRACE BELOW (TOC +23750)

(UG+4) TERRACE

(TOC +26750)

TERRACE (TOC +29800)

TERRACE

TERRACE

(TOC +26750)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE BELOW (TOC +23750)

TERRACE

(TOC +26750)

TERRACE

(TOC +26750)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

(UG+4)

TERRACE

(TOC +26750)

TERRACE (TOC +29800)

TERRACE (TOC +29800)

(TOC +26750)

TERRACE (TOC +29800)

UP

BLOCK - C1 TERRACE BELOW (TOC +23750)

TERRACE BELOW (TOC +23750)

TERRACE

TERRACE BELOW (TOC +23750)

TERRACE

(TOC +26750)

TERRACE

(TOC +26750)

TERRACE (TOC +29800)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE

(TOC +26750)

(TOC +26750)

TERRACE (TOC +29800)

(TOC +27250)

O.H. TANK TOP TOC +30450

TOWER-D

TERRACE BELOW (TOC +23750)

(UG+4)

TERRACE (TOC +29800)

(B1+UG+4 FLOOR)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

SUNKEN COURT BELOW

TOS+51550

MACHINE ROOM TERRACE

O.H. TANKS TOS+57200

6.00M WIDE ROAD

DN TO LOWER GROUND FLOOR

6.00M WIDE ROAD

LVL +450

LVL +300

LVL -2200

LOWER GROUND LVL LVL +1800

L2

LOWER GROUND LVL LVL -2200

BLOCK - F

LOWER TERRACE +7800 TOC LVL

LVL -2200

GREEN

L31

L29

MUMTY +14800 TOC LVL

LVL -2200

L36

,500

BLOCK - A1

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

OPEN FIRE ST. CASE

R10

LVL -2200

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

(UG+4)

TERRACE (TOC +26750)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

L26

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

TERRACE (TOC +29800)

BLOCK - B1

TERRACE BELOW (TOC +23750)

L35

TERRACE (TOC +26750)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE BELOW (TOC +23750)

TERRACE BELOW (TOC +23750)

(UG+4)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

TERRACE (TOC +26750)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

BLOCK - B2

TERRACE BELOW (TOC +23750)

L34

TERRACE BELOW (TOC +23750)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

(UG+4)

TERRACE (TOC +26750)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

L33

TERRACE (TOC +26750)

BLOCK - C1

L39

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

(UG+4)

TERRACE (TOC +26750)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

L40

SUNKEN COURT BELOW

TERRACE

CLUB

TERRACE

(G+1)

FFL+9550

TOC+9300

SKYLIGHT

GREEN

GREEN

TOC+71050 W PY NO

MUMTY FFL+13000

(TOC +26800)

UP

MACHINE ROOM TOC +53315

IT-3 (G+11)

(G+16)

TERRACE TOC+50600

TRANSFORMER-2

TRANSFORMER-3

HT PANEL

3000 VCB

METER ROOM

GREEN

TERRACE

IT TOWER -1 G+13 FLOOR

TOC+58825

MUMTY

TOC+61900

TOC+62900

OVER HEAD TANK

6,000

SUNKEN COURT BELOW

TOC+61900

TOWER E B1+UG +4 FLOORS TERRACE

SUNKEN COURT BELOW

(TOC +27750)

DN TO LOWER GROUND FLOOR

IT TOWER -3 G+11 FLOOR DN

CANOPY

6.00M WIDE ROAD

6.00M WIDE FIRE TENDER PATH

6.00M WIDE FIRE TENDER PATH

(TOC +27250)

TOC+61900

O.H. TANK TOP TOC +30450

MUMTY O.H TANK TOC +56295

MUMTY TERRACE

(TOC +26800)

6.00M WIDE ROAD RAMP OUT

6.00M WIDE ROAD

SPACE FOR BUILDING SERVICES

TERRACE

MUMTY

TOC+62900

60 M WIDE ROAD

6.00M WIDE FIRE TENDER PATH

6.00M WIDE FIRE TENDER PATH

BELOW

7.50M WIDE ROAD

6.00M WIDE FIRE TENDER PATH

RAMP WIDTH 4500MM LENGTH = 40050 MM SLOPE 1: 10

6.00M WIDE FIRE TENDER PATH

TOC+58825

OVER HEAD TANK

TOC+62900

6.00M WIDE ROAD

LVL +450

LVL +300

6.00M WIDE ROAD

6.00M WIDE ROAD

SPACE FOR BUILDING SERVICES

SPACE FOR BUILDING SERVICES

6.00M WIDE ROAD

6.00 M WIDE GATE

LVL +300

6.00M WIDE ROAD

6.00 M WIDE GATE

6.00 M WIDE GATE

EXIT ENTRY

SPACE FOR BUILDING SERVICES

2.00M HIGH BOUNDARY WALL

LVL +450

OPEN FIRE ST. CASE

6.00M WIDE ROAD

TERRACE O.H. TANK TOP TOC +30450

MUMTY O.H TANK TOC +56295

GREEN

L63

SETBACK LINE

2.00M HIGH BOUNDARY WALL

410,020

,500

LVL +300

L61

L60

GREEN

6.00M WIDE ROAD

DN

31,000

6.00M WIDE ROAD

1,000 6,000 1,000 6,000

31,779

OPEN FIRE ST. CASE

L59

OPEN FIRE ST. CASE

BASEMENT LINE SETBACK LINE

16,000

MUMTY TERRACE

25,000

(TOC +26800)

OPEN FIRE ST. CASE

10,500 6,000

6.00M WIDE ROAD

L62 6.00M WIDE ROAD

6.00 M WIDE GATE

LVL +300

6.00 M WIDE GATE

6.00 M WIDE GATE

SUBMISSION DRAWING PROPOSED BOULDING PLAN FOR M/S OCEAN INFRAHEIGHTS PVT. LTD.

18,625 (TOC +27250)

RAMP IN

LVL -2200

LVL -2200

MUMTY

TOC+62900

5,000

TOC+61900

MACHINE ROOM

4,960

6.00M WIDE FIRE TENDER PATH

18,800

(G+13) MUMTY

TOC+61900

BASEMENT LINE

LANDSCAPE PLAN

IT-2

12,000

11230

GREEN MUMTY

TOC+62900

16,960 6,000

9,000

TRANSFORMER-1

6000

6500

DISTRIBUTION PANEL

6000

4000

6000 6500

12000

10,500 6,000

DN

SPACE FOR BUILDING SERVICES 9,000

12,000

L58

6.00M WIDE ROAD

L56

(G+13)

OVER HEAD TANK

TOC+62900

6.00M WIDE ROAD

6.00M WIDE ROAD

LVL +750

TOC+61900

72,350

FFL +50850

LVL +300

L45

R10

,500

L57

LVL +450

TOC+61900

MACHINE ROOM

6.00M WIDE FIRE TENDER PATH

L55

DN

(S+24)

TOC+58825

MUMTY

IT-1

12,000

RAMP OUT R10

RAMP OUT

OPEN FIRE ST. CASE

TERRACE

L53 L54

31,000

H3

20,000

GREEN

IT TOWER -2 G+13 FLOOR MUMTY

OPEN FIRE ST. CASE

6.00M WIDE FIRE TENDER PATH

72,350

L52

6.00M WIDE FIRE TENDER PATH

TOC+74050

6,000

18,800

24,000

MUMTY

DN

4,960

6.00M WIDE FIRE TENDER PATH

FFL+81300

6.00M WIDE FIRE TENDER PATH

16,960 6,000

6.00M WIDE FIRE TENDER PATH

6.00M WIDE FIRE TENDER PATH

24,316

L51 RAMP WIDTH 4500MM LENGTH = 40050 MM SLOPE 1: 10

26,900

VOID

6,000

(B1+UG+4 FLOOR)

L46 88,685

TOC+10300

IT-4

GREEN

UP

UP

MUMTY TERRACE

TOWER-E

FLUSHING TANK BELOW

TOC+10500

LVL +1800

(TOC +26800)

TOC+74050

TOC+75050

TERRACE BELOW F FL LVL.+23750

(TOC +29800)

DN FROM UPPER GROUND FLOOR

DOMESTIC TANK BELOW

GREEN

DN

6.00M WIDE ROAD

FFL+79200

TERRACE

MUMTY MACHINE ROOM

DN FROM UPPER GROUND FLOOR

TOC+12750

GREEN

MUMTY TERRACE

TOC+61900

LVL -2200

TERRACE

MACHINE ROOM TOC +53315

OH WATER TANK TERRACE

IT TOWER -1 G+13 FLOOR

TOC+61900

MUMTY

L22

(TOC +27750)

OPEN FIRE ST. CASE

CA

L47

MUMTY

OVER HEAD TANK

LVL +750

7,500

LVL -2200

LIFT MACHINE TERRACE

MUMTY O.H TANK TOC +56295

6.00M WIDE ROAD

16,000

MACHINE ROOM

TOC+75050

6.00M WIDE FIRE TENDER PATH

IT TOWER -4 G+16 FLOOR

1050 HIGH PARAPET

LO

GREEN

H2

L23

L44

BE

FFL+81300

H3 S+24

IT-2

(G+13) TOC+61900

SUNKEN COURT BELOW

16,000

OPEN FIRE ST. CASE

L48

OPEN FIRE ST. CASE

L43

DN

FFL+79200

6,000

TOWER D B1+UG +4 FLOORS TERRACE

DN

TERRACE

MUMTY TERRACE

10,500

DN

26,900

FFL+79200

L25

LVL +300

DN TO LOWER GROUND FLOOR

25,000

7.50M WIDE ROAD

MUMTY TERRACE

FFL+76250

6.00M WIDE ROAD

2.00M HIGH BOUNDARY WALL

GREEN

LVL +450

RAMP WIDTH 4500MM LENGTH = 40050 MM SLOPE 1: 10

6.00M WIDE FIRE TENDER PATH

23,860

TOS+76000

VOID

(B1+UG+4 FLOOR)

TERRACE (TOC +29800)

L42

TOC+74050

DN

OPEN FIRE ST. CASE

6.00M WIDE ROAD

LVL +450

L41

6.00M WIDE FIRE TENDER PATH

LVL +750

VOID

6.00M WIDE ROAD

95,231

6.00M WIDE ROAD

RY WALL 2.00M HIGH BOUNDA

RAMP IN

6.00M WIDE ROAD (+750 MM) LVL +750

TERRACE

LVL +450

MUMTY

DN

TOWER-D

L24

TERRACE (TOC +26750)

MUMTY

7.50M WIDE ROAD

245,760

GREEN

FFL+77450

IT-1

(G+13)

TOC +26800)

(TOC +27250)

,500

LVL +450

H1

MRL LIFT SHAFT TERRACE

TOC+62900

LVL +1800

TERRACE O.H. TANK TOP TOC +30450

R10

6.00M WIDE ROAD

(G+16)

L50

OVER HEAD TANK

TOC+62900

MUMTY TERRACE

L19

LVL +1800

LVL +300

DN

MUMTY TERRACE

FFL+79200

TOC+58825

MUMTY TOC+61900

MACHINE ROOM

DN

L21

LVL -2200

6.00M WIDE FIRE TENDER PATH

LVL +450

10,500 6,000

FFL+62050

LVL +750

TERRACE

IT TOWER -2 G+13 FLOOR TOC+61900

(S+24)

LVL -2200

DN TO GROUND FLOOR LOWER

L17

SUNKEN COURT BELOW

UP

TERRACE BELOW (TOC +23750)

L37

L27

SUNKEN COURT BELOW

GREEN

L32

LVL +450

DN

DN

H1

L28

SUNKEN COURT BELOW

6.00M WIDE FIRE TENDER PATH

GREEN

O.H. TANKS

MUMTY TERRACE

TOC+74050

RAMP OUT

6.00M WIDE ROAD

LVL +750

UP

UP

LVL -2200

SUNKEN COURT BELOW

(TOC +27750)

EXIT ENTRY

(FORMERLY M/S U.Y. INDUSTRIES PVT. LTD.)

ON PLOT NO. -11, SECTOR-TECHZONE - IV, GREATER NOIDA.

SIKKA ASSOCIATES ARCHITECTS

URBAN DESIGN | MASTERPLAN | ARCHITECTURE | INTERIORS | ENGINEERING | PROJECT MANAGEMENT

ARCHITECT'S SIGN

RAMP WIDTH 4000 MM SLOPE 1: 10

23,860

MUMTY

MUMTY

STAGE

OUT

SUNKEN COURT BELOW

L38

(S+16)

TOC+50600 FFL +50850

6.00M WIDE FIRE TENDER PATH

TOWER E B1+UG +4 FLOORS TERRACE

UP

L20

LVL +1800

L18

TOS+62625

GREEN

TOS+76000 FFL+76250

FFL+79200

H3

(B1+UG+4 FLOOR)

SUNKEN COURT BELOW

IT TOWER -3 G+11 FLOOR

FFL+81300

PROJECT

MUMTY +14800 TOC LVL

RAMP WIDTH 4000 MM SLOPE 1: 10

G+16

OH WATER TANK TERRACE

TERRACE

6.00M WIDE FIRE TENDER PATH

LVL +300

KEY PLAN

ARCHITECT

L30

IN

T E R R A C E

GREEN

L15

LVL +1800

TOS+59050

H3 S+24

(G+16)

OWNER'S SIGN

(LG+UG+4)

OHT TANK TOP

MRL TOC

FFL+76250

TERRACE

FFL+77450

MUMTY TERRACE OH WATER TANK TERRACE

LVL +1800

TOWER-E

SCALE

NORTH

1:500

ISSUE DATE : April. 2019 DRAWN BY : CHECKED BY :

YASHASH SUMIT

DRAWING TITLE

(LG+UG+4)

L14

UP

LIFT MACHINE TERRACE +17850 TOC LVL

TOS+76000

UP

TERRACE BELOW F FL LVL.+23750

(TOC +29800)

MUMTY TERRACE

(TOC +26800)

DN FROM UPPER GROUND FLOOR

IT-3 (G+11)

LANDSCAPE PLAN & GREEN AREA CHART

DWG NO.

(LG+UG+4)

BLOCK - C

20.0M WIDE GREEN BELT

T E R R A C E +11750 TOC LVL

GREEN

FFL+77450

ENTRY

UP

6.00M WIDE ROAD

6.00M WIDE ROAD

2 REAR SIDE

PLOT NO-GH-0

MUMTY +14800 TOC LVL

LIFT MACHINE TERRACE +17850 TOC LVL

LVL +600

MRL LIFT SHAFT TERRACE

(TOC +26800)

MACHINE ROOM TOC +53315

RAMP IN

10.00M WIDE ROAD

245,870

BLOCK - B

L13

L16

6.00M WIDE ROAD

L49

6.00 M WIDE GATE

H3 S+24

MRL LIFT SHAFT TERRACE VOID

L1

FFL+79200

LVL -2200

TERRACE

LIFT MACHINE TERRACE

MUMTY O.H TANK TOC +56295

FFL+13000

TOC+10300

TOC +53315

6.00M WIDE ROAD (+300 MM)

SUNKEN COURT BELOW

BLOCK - A

L12

LOWER TERRACE +7800 TOC LVL

LVL +750

MUMTY TOC+12750

FLUSHING TANK BELOW

LVL +1800

L11

L10

FFL+60800

TOC+9300 FFL+9550

SKYLIGHT

TOC+10500

LVL +300

LVL +1800

MUMTY TERRACE

TERRACE

(G+1)

IT-4

MACHINE ROOM

UP

MUMTY +14800 TOC LVL

FFL+62050

CLUB

DOMESTIC TANK BELOW

TOC+75050

6.00M WIDE FIRE TENDER PATH

(LG+UG+8 FLOOR)

OPEN FIRE ST. CASE

1050 HIGH PARAPET

TOC+71050

TOC+75050

MUMTY

TOC+74050

OVER HEAD TANK

LVL +750

MUMTY TERRACE

LVL +750

SUNKEN COURT BELOW

(TOC +27750)

LVL +450

IT TOWER -4 G+16 FLOOR

MACHINE ROOM

(S+16)

6.00M WIDE ROAD (+300 MM)

OHT TANK TOP

TOS+76000 FFL+76250

FFL+79200

6.00M WIDE FIRE TENDER PATH

L3

LVL +1800

H3 S+24

TERRACE

MUMTY TERRACE

H2

6.00M WIDE FIRE TENDER PATH

L4

FFL+79200

FFL+77450

FFL+81300

RAMP WIDTH 4500MM LENGTH = 40050 MM SLOPE 1: 10

L5

L6

LOWER GROUND LVL LVL -2200

LVL +1800

LVL +1800

RAMP IN

TERRACE MUMTY TERRACE

SHAFT MRL LIFT TERRACE

OH WATER TANK TERRACE

6.00M WIDE ROAD

L7

LOWER GROUND LVL LVL -2200

GREEN

10.00M WIDE ROAD

DN

6.00M WIDE ROAD

6.00M WIDE ROAD

6.00M WIDE ROAD

L9

L8

LOWER GROUND LVL LVL -2200

UP

6.00M WIDE ROAD (+750 MM) LVL +750

LVL +750

GREEN

TOWER D B1+UG +4 FLOORS TERRACE

DN FROM UPPER GROUND FLOOR

MUMTY TOC+74050

RAMP UP TO GRD FLR.

20.0M WIDE GREEN BELT

FFL+57200

MUMTY TERRACE FFL+54450

UP

RAMP DN TO BASEMENT

UP

MUMTY TERRACE FFL+54450

TERRACE BELOW (TOC +23750)

H1

RAMP DN TO BASEMENT

6.00M WIDE ROAD (+300 MM)

DN

SUNKEN COURT BELOW

BLOCK - A1

LVL +600

(G+14)

UP

LVL +1800

MUMTY TERRACE

LVL +300

DN RAMP UP TO GRD FLR.

ENTRY

UP

LVL +1800

BLOCK - A

UP

6.770 M WIDE ROAD

UP

LVL +1800 2400 WIDE CORRIDOR

REAR SIDE

LVL +300

UP

LOWER GROUND LVL LVL -2200

UP

LOWER GROUND LVL LVL -2200

LVL +1800

PLOT NO-GH-02

12,000

6.770 M WIDE ROAD

LVL +300

DN

UP

LOWER GROUND LVL LVL -2200

ENTRY EXIT

6.770 M WIDE ROAD

LVL +300

12,000

LVL +600

LVL +600

LVL +600

LVL +450

DN DN

DN

6.00 M WIDE GATE

GUARD ROOM

6.00M WIDE ROAD (+300 MM)

6.00 M WIDE GATE

3. ALL BASEMENTS ARE MECHANICALLY LIGHTED AND VENTILATED AS PER N.B.C. NORMS. 4. ALL TOILETS & CORRIDORS MECHANICALL LIGHTED & VENTILATED AS PER N.B.C. NORMS. 5. 100 % POWER BACKUP PROVIDED

PLOT LINE SETBACK LINE BASEMENT LINE

SG/A/LP-01

36


16,000

230,000

22,500 11,000 11,000

11,000

11,000 11,000

OP4

OP2

11,000

OP7

45,000

25,000

11,000

OP5

5,000

32,500 67,500

OP20

OP3

OP14

16,000 16,000

20,000

8,000

OP9

62,500

8,000

OP8

11,000

17,500

11,000

OP6

OP16

62,500

11,000

20,000

OP15

OP19 11,000

OP10

11,000

57,500

OP24 40,000

50,000

OP22

17,500

11,000

11,000

8,000

27,500

11,000 11,000

OP30

OP28

11,000

OP18

20,000

55,000

OP27

16,000 50,000

8,000

30,000

40,000

33,341

OP21

OP25

OP23

OP26 11,000

28,093

OP13

11,000

12,500

11,000

17,500

85,000

OP17

OP11

OP31

OP12

11,000

16,050

332,524

8,000

OP29

OP1

8,000

45M WIDE ROAD EXIT ENTRY 6.00 M WIDE GATE

6.00 M WIDE GATE 11,000

PLOT LINE SETBACK LINE BASEMENT LINE

EXIT

404,570 332,524

6.00 M WIDE GATE

OP1

LVL +450

6.770 M WIDE ROAD

12,000

LVL +600

LVL +600

LVL +600

LVL +300

6.770 M WIDE ROAD

LVL +300

12,000

11,000

GUARD ROOM

LVL +300

6.770 M WIDE ROAD

LVL +300

LVL +300

LOWER GROUND LVL

LVL -2200

BLOCK - F

LOWER TERRACE +7800 TOC LVL

TERRACE TOC+27750

MUMTY TERRACE TOC+26750

TERRACE (TOC +29800)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

(UG+4)

TERRACE (TOC +26750)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

TERRACE (TOC +29800)

6.00M WIDE ROAD

TERRACE (TOC +29800)

TERRACE (TOC +29800)

LVL +450

OP14

TERRACE (TOC +29800)

SUNKEN COURT BELOW

R10,

500

10,500

6.00M WIDE ROAD

LVL +300

FFL+9550

SKYLIGHT

GREEN

OP15 OPEN FIRE ST. CASE

(G+11)

(G+16)

TERRACE

TRANSFORMER-3

VCB

METER ROOM

OP16 LVL +450

OP24

SPACE FOR BUILDING SERVICES

OPEN FIRE ST. CASE

11,000

SETBACK LINE BASEMENT LINE PLOT LINE

OVER HEAD TANK

OP25

2.00M HIGH BOUNDARY WALL

410,020

FFL +50850

LVL -2200

TOC+61900

OP30

SUNKEN COURT BELOW

(TOC +27750)

DN TO LOWER GROUND FLOOR

DN

OP22

TERRACE O.H. TANK TOP TOC +30450

MUMTY O.H TANK TOC +56295

GREEN 500

LVL +300

16,000

MUMTY TERRACE

25,000

(TOC +26800)

40,000

GREEN

6.00M WIDE ROAD

OPEN FIRE ST. CASE

10,500 6,000

6.00M WIDE ROAD

OP23

SPACE FOR BUILDING SERVICES

OPEN FIRE ST. CASE

6.00 M WIDE GATE

LVL +300

6.00M WIDE ROAD

PROPOSED BUILDING PLAN FOR M/S OCEAN INFRAHEIGHTS PVT. LTD.

(FORMERLY M/S U.Y. INDUSTRIES PVT. LTD.)

ON PLOT NO. -11, SECTOR-TECHZONE - IV, GREATER NOIDA.

SIKKA ASSOCIATES ARCHITECTS

URBAN DESIGN | MASTERPLAN | ARCHITECTURE | INTERIORS | ENGINEERING | PROJECT MANAGEMENT

OP31

R10,

6.00M WIDE ROAD

SUBMISSION DRAWING

11,000

18,625 (TOC +27250)

RAMP IN

LVL -2200

16,000

IT TOWER -3 G+11 FLOOR

6.00M WIDE FIRE TENDER PATH

SUNKEN COURT BELOW

MUMTY

TOC+62900

DN

OP26

12,000

DN

OP17

50,000

12,000

OPEN FIRE ST. CASE

TOC+62900 67,500

17,500

11,000

6.00M WIDE ROAD

MACHINE ROOM

TOC+61900

6,000

6.00M WIDE FIRE TENDER PATH

TOC+61900

TOC+61900

4,960

OP21

TOWER E B1+UG +4 FLOORS TERRACE

6.00 M WIDE GATE

6.00 M WIDE GATE

EXIT ENTRY

SCALE

SPACE FOR BUILDING SERVICES

NORTH

1:500

ISSUE DATE : April. 2019 DRAWN BY : CHECKED BY :

DN

6.00M WIDE ROAD

TOC+62900

TOC+58825

MUMTY

11,000

67,500

TERRACE

IT TOWER -1 G+13 FLOOR

MUMTY

5,000

TOC+62900

IT-2

(G+13)

11,000

MACHINE ROOM

TOC+61900

18,800

GREEN MUMTY

31,000

OVER HEAD TANK

85,000

11,000 HT PANEL

3000

IT-1

(G+13)

TOC+61900

DN

11230

TOC+58825

LVL +450

9,000

TRANSFORMER-2

6000

6500

TRANSFORMER-1

6000

4000

6500

DISTRIBUTION PANEL

6000

16,960

GREEN

1,000 6,000 1,000 6,000

10,500 6,000

TERRACE

IT TOWER -2 G+13 FLOOR

MUMTY

RAMP OUT

OP13

6.00M WIDE ROAD

SPACE FOR BUILDING SERVICES 12000

0

72,350

GREEN

31,000

0,50

6.00M WIDE FIRE TENDER PATH

20,000

6,000

11,000

(S+24) OP5 6.00M WIDE ROAD

20,000 8,000

31,779

DN

RAMP OUT R1

OPEN FIRE ST. CASE 8,000

11,000

H3

20,000

12,000

TOC+74050

6.00M WIDE FIRE TENDER PATH

72,350

6,000

MUMTY

OPEN FIRE ST. CASE

LVL +750

9,000

MUMTY

DN

4,960

18,800

FFL+79200

FFL+81300

GREEN

11,000

6.00M WIDE ROAD

MUMTY TERRACE OH WATER TANK TERRACE

OP12 OP11

6.00M WIDE FIRE TENDER PATH

16,960 6,000

24,000

FFL+76250

24,316

TOC+50600

MACHINE ROOM TOC +53315

6.00M WIDE FIRE TENDER PATH

VOID

TOS+76000

6,000

LVL +300

(B1+UG+4 FLOOR)

28,093

TOC+75050

11,000

6.00M WIDE ROAD

TOC+10300

IT-4

OVER HEAD TANK

GREEN

30,000

FFL+77450

UP

(TOC +26800)

DN

IT-3

FLUSHING TANK BELOW

TOC+10500

OP29

UP

16,000

OP20

TOWER-E

88,685

DOMESTIC TANK BELOW

LVL +1800

MUMTY TERRACE

OP19

TOC+74050

6.00M WIDE FIRE TENDER PATH

55,000 6.00M WIDE FIRE TENDER PATH

TERRACE

(TOC +29800)

MACHINE ROOM TOC +53315

DN FROM UPPER GROUND FLOOR

MUMTY

TERRACE BELOW F FL LVL.+23750

LIFT MACHINE TERRACE

MUMTY O.H TANK TOC +56295

40,000

PY NO

TOC+12750 FFL+13000

UP

6.00M WIDE ROAD (+300 MM)

GREEN

(TOC +26800)

UP

(G+1)

11,000

TERRACE

ARCHITECT

TOC+9300

16,050

TERRACE

UP

CLUB

OW

TOC+71050

1050 HIGH PARAPET

OPEN FIRE ST. CASE

RAMP WIDTH 4500MM LENGTH = 40050 MM SLOPE 1: 10

H3 S+24

26,900

FFL+79200

(TOC +27750)

DN FROM UPPER GROUND FLOOR

16,000

45,000

TERRACE

LVL +750

MUMTY TERRACE

OP28

LVL -2200

11,000

8,000

MRL LIFT SHAFT TERRACE

LVL -2200

SUNKEN COURT BELOW

16,000

OP9

7,500

6,000

OPEN FIRE ST. CASE

OP18

DN TO LOWER GROUND FLOOR

TOWER D B1+UG +4 FLOORS TERRACE

25,000

OP8

GREEN

(B1+UG+4 FLOOR)

GREEN

TERRACE (TOC +26750)

LVL +450

OP7

8,000

16,000

TERRACE (TOC +29800)

TOWER-D

TERRACE BELOW (TOC +23750)

50,000

TOC+74050

IT TOWER -4 G+16 FLOOR

8,000

TERRACE (TOC +29800)

TERRACE (TOC +26750)

MUMTY

TOC+75050

H2

TERRACE BELOW (TOC +23750)

(UG+4)

TERRACE (TOC +26750)

OWNER'S SIGN

OP6

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

11,000

8,000

OP10

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

ARCHITECT'S SIGN

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

STAGE

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

BASEMENT LINE SETBACK LINE

PROJECT

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

(UG+4)

TERRACE (TOC +26750)

(TOC +27250)

O.H. TANK TOP TOC +30450

DRAWING TITLE

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

BLOCK - C1

DWG NO.

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

BLOCK - B2

57,500

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

MACHINE ROOM

GREEN

LVL +1800

GREEN

DN

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

BLOCK - B1

MUMTY

FFL+81300

LVL +300

16,000

60 M WIDE ROAD

6.00M WIDE ROAD

BEL

RAMP WIDTH 4500MM LENGTH = 40050 MM SLOPE 1: 10

LVL +450

WATER TANK TOC+30450

LVL -2200

17,500

FFL+79200

SUNKEN COURT BELOW

WATER TANK TOC+30450

DN

MUMTY TERRACE

WATER TANK TOC+30450

LVL -2200

95,231

TERRACE

12,500

26,900

FFL+79200

17,500

6.00M WIDE FIRE TENDER PATH

MUMTY TERRACE

SUNKEN COURT BELOW

WATER TANK TOC+30450

67,500

LVL +450

DN

OPEN FIRE ST. CASE 23,860

OP27

MUMTY TERRACE

TOC +26800)

27,500

RAMP IN

OP4

VOID

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

6.00M WIDE FIRE TENDER PATH

25,000

22,500

11,000

TERRACE (TOC +29800)

TERRACE BELOW (TOC +23750)

(UG+4)

TERRACE (TOC +26750)

11,000

11,000

7.50M WIDE ROAD

(G+16)

6.00M WIDE ROAD

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

20,000

11,000

7.50M WIDE ROAD

230,000

TERRACE BELOW (TOC +23750)

TERRACE (TOC +26750)

10,500 6,000

BLOCK - A1

6.00M WIDE ROAD

LVL +750

TERRACE TOC+27750

LVL +1800

LVL +1800

TERRACE TOC+27750

TERRACE BELOW TOC+23750

TERRACE TOC+27750

UP

DN

DN

500

H1

245,760

WATER TANK TOC+30450

6.00M WIDE ROAD

TERRACE BELOW (TOC +23750)

O.H. TANKS

6.00M WIDE ROAD (+750 MM) LVL +750

TERRACE TOC+27750

LVL +450

OPEN FIRE ST. CASE

R10,

T E R R A C E

TERRACE BELOW TOC+23750

TERRACE

GREEN

RY WALL

(LG+UG+4)

245,870

6.00M WIDE ROAD

MUMTY TERRACE

LVL +750

11,000

GREEN

MUMTY TERRACE TOC+26750

MACHINE RM TERRACE TOC+29750

MUMTY TERRACE TOC+26750

TERRACE BELOW TOC+23750

LVL -2200

GREEN

H1

23,860

LVL +300

20.0M WIDE GREEN BELT

GREEN

FFL+62050

2.00M HIGH BOUNDA

BLOCK - C

6.00M WIDE FIRE TENDER PATH

RAMP WIDTH 4000 MM SLOPE 1: 10

G+16

(S+16)

(LG+UG+4)

MUMTY TERRACE TOC+26750

62,500

RAMP WIDTH 4000 MM SLOPE 1: 10

TOS+59050

GREEN

MACHINE RM TERRACE TOC+29750

BLOCK - B

MACHINE RM TERRACE TOC+29750

11,000

IN

TOS+62625

FFL+76250

MUMTY TERRACE TOC+26750

SUNKEN COURT BELOW

WATER TANK TOC+30450

MUMTY +14800 TOC LVL

MRL TOC

TOS+76000

10.00M WIDE ROAD

UP

MUMTY TERRACE TOC+26750

ENTRY

DN

GREEN

FFL+77450

TERRACE TOC+27750

TERRACE BELOW TOC+23750

6.00M WIDE ROAD (+300 MM)

LVL -2200

MUMTY +14800 TOC LVL

OUT

FFL+60800

TERRACE TOC+27750

6.00 M WIDE GATE

OHT TANK TOP

SUNKEN COURT BELOW LIFT MACHINE TERRACE +17850 TOC LVL

FFL+62050

TERRACE TOC+27750

TERRACE BELOW TOC+23750

GREEN

LVL +1800

LVL +600

OH WATER TANK TERRACE

GREEN

MUMTY TERRACE TOC+26750

(LG+UG+4) MUMTY TERRACE TOC+26750

62,500

6.00M WIDE ROAD

6.00M WIDE ROAD

32,500

02 REAR SIDE

PLOT NO-GH-

T E R R A C E +11750 TOC LVL

LIFT MACHINE TERRACE +17850 TOC LVL

MUMTY TERRACE

TERRACE TOC+27750

TERRACE TOC+27750

MUMTY +14800 TOC LVL

OPEN FIRE ST. CASE

TERRACE TOC+27750

BLOCK - A

MACHINE RM TERRACE TOC+29750

TERRACE TOC+27750

6.00M WIDE ROAD

H3 S+24

LOWER GROUND LVL LVL -2200

UP

LOWER TERRACE +7800 TOC LVL

MRL LIFT SHAFT TERRACE

RAMP UP TO GRD FLR.

LVL +1800

LVL +1800

SUNKEN COURT BELOW

5,000

TERRACE BELOW TOC+23750

MUMTY TERRACE TOC+26750

CA

OHT TANK TOP

LVL +1800

LVL +750

UP

RAMP DN TO BASEMENT

LOWER GROUND LVL LVL +1800

LOWER GROUND LVL LVL -2200

LVL +1800

MUMTY +14800 TOC LVL

OP2

RAMP DN TO BASEMENT

LVL +1800

10.00M WIDE ROAD

LOWER GROUND LVL LVL -2200

(LG+UG+8 FLOOR)

OP3

UP

RAMP UP TO GRD FLR. UP

6.00M WIDE ROAD

6.00M WIDE ROAD

6.00M WIDE ROAD

DN

DN

YASHASH SUMIT

PARKING PLAN SG/A / 02

37


PLUMBING & FF CONSULATANTS STRUCTURAL

E MAIL : - ssaabb@vsnl.com NEW DELHI

OWNER

Ramprastha Promoters & Developers Pvt. Ltd. 114, Sector-44, Gurgaon.

GROUP HOUSING, SECTIOR-37 D GURGAON

PROJECT ARCHITECT

TEL : - 98100 56948

SIKKA ASSOCIATES ARCHITECTS

URBAN DESIGN | MASTERPLAN | ARCHITECTURE | INTERIORS | ENGINEERING | PROJECT MANAGEMENT

A: A-2/1, AFRICA AVENUE, SAFDARJUNG ENCLAVE, NEW DELHI, INDIA 110 029 T: +91.11.4323.5235 | F: +91.11.2629.4481 | E: saa@saaindia.net | W: www.saaindia.net

SEAL

ISSUED FOR

INFORMATION & REVIEW TENDER SUBMISSION GFC AS BUILT

1:50

SCALE DATE ISSUED

08.02.2019 YASHASH

CHECKED BY

SUMIT JAIN

CLUBHOUSE RENDERED VIEW PLOT -A (PRIMERA )

471

DWG NO.

DWG NO.

DRAWING TITLE

DRAWN BY

RP/CL/02


W1A

GYM.

W1A

7 2

3

5

FD 750

VOID.

970 230

A9

A10

A11

A12

230 1700 1300 3350

4500

2100

5250

15880 14100 12650

15300

1950

4050 450 900

1750

3600

4950

1.2 M WD CORRIDOR

2100 2950

680

SECTION 3-3

1200 250

250

100

220

150

LV

5

GENTS TOILET 5600 X 5240 (+1350)

FHC

LIFT 2700 X 2000 (10 pax)

2000

1

LVL +1330 LVL +1330

RAMP LVL +1050 SLOPE 1:12

KEY PLAN

BOQ ITEMS

20 MM MORTAR

40 MM SCREED 1:2:4 ( AVERAGE SLOPE 1:100 )

BOQ ITEM 12.04

5TH

APP (ATACTIC POLYPROPYLENE POLYMER) MODIFIED PREFABRICATED FIVE LAYER 3MM THICK WATER PROOFING MEMBRANE

BOQ ITEM 12.06

R3

14.03.2019

GFC ISSUED TO SITE

R2

07.01.2019

WATER TANK ADDED & 1ST FLOOR HEIGHT RAISED BY 300MM

R1

28.12.2018

GFC ISSUED TO SITE

40 MM SCREED 1:2:4 ( AVERAGE SLOPE 1:100 )

3RD

GEOTEXTILE LAID OVER PUFF

BOQ ITEM 12.04

2ND

1 LAYER OF 40MM THICK PUFF SPRAY INSULATION

BOQ ITEM 11.02

1ST

100 MM (AVERAGE) BRICKBAT COBA IN SLOPE

BOQ ITEM 12.02

R0

20.12.2018

#

DATE

GFC ISSUED TO SITE DESCRIPTION

PLUMBING & FF CONSULATANTS

REVISIONS

STRUCTURAL

250

E MAIL : - ssaabb@vsnl.com NEW DELHI

TEL : - 98100 56948

1300

A12

OWNER

W = 5260 T = 300 R=143.33

SECTION 4-4

GROUP HOUSING, SECTIOR-37 D GURGAON

ROAD/LANDSCAPE LVL. +900 NON TOWER 1ST BASEMENT ROOF T.O.C LVL. ±0,00

ISSUED FOR

LVL +1330

VOID.

G.FL. LVL. LVL. +1350 ROAD/LANDSCAPE LVL. +900

1800

PART SECTION 1a

SCALE DATE ISSUED DRAWN BY CHECKED BY

1ST.BASEMENT TOC. LVL. ± 0,00

900

SIKKA ASSOCIATES ARCHITECTS

URBAN DESIGN | MASTERPLAN | ARCHITECTURE | INTERIORS | ENGINEERING | PROJECT MANAGEMENT

SEAL

100

LANDSCAPE LVL. LVL +900

T.O.C LVL +1200

100 MM Thk. PCC

CORRIDOR

100 MM SUNK

114, Sector-44, Gurgaon.

PROJECT

W1

FD G.FL. LVL. LVL. +1350

Ramprastha Promoters & Developers Pvt. Ltd.

ARCHITECT

230 1700

1700

400 400 900

3350

MULTI PURPOSE HALL

100 MM SUNK

ROAD/ LANDSCAPE LVL. +900

PLUMBING SHAFT

4.00 METER WIDE CORRIDOR LVL +1350

FOLDING PARTITION

COFFEE LOUNGE 10190 X 4250

PLANTER

A12

MUMTY LVL. LVL. +14000

FIRST FL. LVL. LVL. +5400

LADIES TOILET

1ST.BASEMENT TOC. LVL. ± 0,00

RCC beam frame AS/STR.Dwg. ( dwg BS04 & B-S04B )

PLUMBING SHAFT

13950

17000

G.FL. LVL. LVL. +1350

LVL +1330

2

GEOTEXTILE LAID OVER APP

TOC LVL. +15300

5250

1200 2700

5250

1350 1650

MID LANDING LVL. +3750

1350

1

1000

11

CORRIDOR

3

LADIES TOILET 4770 X 6345 (+1350)

LVL +1350

DRAWING TITLE

9

17 16 15

FD

FIRST FL. LVL. LVL. +5400

UP

SPL. ABLED 1700 X 2300

UP LVL.+1050

1350

13

4050

19

2200

4050

WIDTH=2000 TREAD=300 RISER=150

W3

MID LANDING LVL. +6750

FD FD1

4

UP

6TH

TERRACE LVL. LVL. +10650

LADIES TOILET

ELE. ROOM 2120 X 4300

A9

400 MM FILL UP

2400

21

OPEN DECK (LVL +10800)

MID LANDING LVL. +9450

LVL +1050

DWG NO.

1385

2800

10400

23

8865

7515

25

ELEC. ROOM

F.FL.LVL.

ROAD LVL +900 WATER BODY

300

32 28

27

1580 1580

600 150

34

FIRE STAIRCASE

MULTI PURPOSE HALL

TERRACE LVL. LVL. +10650

MULTIPURPOSE HALL 10190 X 14447 LVL +1350

1ST BASEMENT LVL. -3600

DESCRIPTION

TERRACE TOC +17000

4050

2500

37 36

30

W1

1005

200

39

W2

TERRACE

300

450

41

F.FL.LVL.

230 1155

2550

45

1200

200 2650 200

750

W1

ELEC. ROOM

2500

G Y M

3465

3365

47 43

RCC SLAB AS/STR.DRG.

ALUMINUM FRAME TO SUPPORT GLASS

56 53 51 49

300 FILLING

WATER CASCADE

58

D3

LIBRARY / READING HALL 10190 X 8140

FILLING WITH WATER PROOFING COMPOUND

900

3350 1500 64 60

DETAIL D1

KITCHEN 10575 X 3565 LVL +1350

CHINA MOSAIC / HEAT REFLECTIVE TILE

LADIES TOILET

W3

62

1600

1535

1785

1200

285 1340

1430

RCC SLAB AS/STR.DRG.

TERRACE

1500

2800 LVL+10800

DRAIN

SWIMMING POOL

MUMTY LVL. LVL. +14000

1000

LVL+10650

LVL+10950

1500

DETAIL D1

250

160

TERRACE TOC +10100

500

DETAIL-03

1200

500

PARAPET WALL

1200

GLASS PARAPET WALL

TURN IN SECTION

RCC COLUMN IN ELEVATION

LOCKERS

TERRACE RCC COLUMN IN ELEVATION

TRELLIS

3080

300

PARAPET WALL

LOCKERS

VOID

O.H.TANK BOTTOM TOC.LVL.+15700

G. TOILET

2006 X 3958

UP

1

WATER PROOFING SYSTEM ON TOP TERRACE SLAB (D1)

1700

FLUSH TANK - 8000 LTRS

SHOP 6

2750 X 8250

DETAIL-03

O.H.TANK TERRACE TOC.LVL.+17000

1300 230

FREE BOARD

VOID

800

FREE BOARD

DOMESTIC TANK - 12000 LTRS

PLASTER WITH WATER PROOFING COMPOUND

STUB COLUMN

D3

ROAD/LANDSCAPE 1a LVL. +900

NON TOWER 1ST BASEMENT ROOF T.O.C LVL. ±0,00

7TH

4TH

SECTION 1-1

A12

3350

A11

1000

A10

WATERFALL POOL

3300

4050

3400

1350 220

100

ROAD/ LANDSCAPE LVL. +900 1ST.BASEMENT TOC. LVL. ± 0,00

G.FL. LVL. LVL. +1350

POOL LVL. +9150

DETAIL-02 A9

CERAMIC TILES 200 X 200

300

5250 1350

900

1ST.BASEMENT TOC. LVL. ± 0,00

OVER FLOW DRAIN ADHESIVE

RETAINING WALL AS PER STRUCTURE

FILLING WITH WATER PROOFING COMPOUND

G.FL. LVL. LVL. +1350

9TH

15300

1

VOID. PLANTER

MID LANDING LVL. +3450

4050

RECEPTION AREA

KITD'S POOL LVL. +9750

2006 X 4262

SHOP 5

2750 X 8250

RECEPTION AREA LVL +1350

LAYERS 8TH

R.C.C

285

5

R.C.C

RETAINING WALL AS PER STRUCTURE

1900

10

FD

FLR. FIN. LVL. +1350

14

12

450

15

4050

4050

3300

100

D1

1350

1275

4.0 M WIDE CORRIDOR

250

SHOP 4 2750 X 8250

WATER BODY

SLOPE

DRAIN

PLASTER WITH WATER PROOFING COMPOUND

FIRST FL. LVL. LVL. +5400

1300

20

LIBRARY / READING HALL

LIFT PIT

SECTION 5-5

A11

285

SLOPE

SHOP 3 2750 X 8250

SHAFT

285

3100

25

W3

1500

28

27

MULTI PURPOSE HALL

1200

32 30

F.FL.LVL.

WATER LVL.

250

CERAMIC TILES 200 X 200

MID LANDING LVL. +6750

250

POOL DECK LVL. +10350 LVL.

DRAIN

OVER FLOW DRAIN ADHESIVE

300

36

POOL DECK LVL. +10350 LVL.

WATER LVL.

SLOPE

ANCHOR

600

600

37 34

W2

1000

39

2500

FD

2500

2350

200

D1

41

2500

4.0 M WIDE CORRIDOR

3465

3365

GYM

150

45 43

600

7515

47

MID LANDING LVL. +9450 17000

2500

49

250

900

56 53 51

TERRACE LVL. LVL. +10650

250

58

2650

RCC SLAB AS/STR.DRG.

1000

200

60

150

62

RCC SLAB AS/STR.DRG.

ROAD LVL +900

4050

2100 230

3350 4000 64

300 FILLING

230

1300

300 1500 2950 LVL+10950

285 SLOPE

W2

PVC DRAIN CHANNEL COVER

3

GENTS TOILET

8625

PVC DRAIN CHANNEL COVER

1500

2850 3050

2350 LVL+10800

VOID

TV LOUNGE

TERRACE TOC +17000

SHOP 2 2750 X 8250

STUB COLUMN

CORRIDOR

LIFT SHAFT, PLUMBING SHAFT TOC LVL. +15300 MUMTY LVL. LVL. +14000

L. TOILET

LVL +1350

D2

SHOP 1

2750 X 8250

2350

SECTION 2-2

B11

LVL +1350

D2

1700

380

AC UNIT

LVL+10650

1785

1535

300 1200 950

1785

150 150300

SWIMMING POOL

PLUMBING SHAFT IN ELE.

LIFT SHAFT IN ELE.

DETAIL D1

DRAIN

ROAD/ LANDSCAPE LVL. +900 1ST.BASEMENT TOC. LVL. ± 0,00

RCC beam frame AS/STR.Dwg. ( dwg BS04 & B-S04B )

B10

SPACE FOR AC OUTDOOR UNITS

250

250

2385

1200

DETAIL-03

FIRST FL. LVL. LVL. +5400

G.FL. LVL. LVL. +1350

RCC COL. IN ELEVATION

B9

GRC JALLI SCREEN WALL

COL IN ELEVATION

500

PARAPET WALL

GRC JALLI IN ELE.

RCC beam frame AS/STR.Dwg. ( dwg BS04 & B-S04B )

RCC COL. IN ELEVATION

1ST BASEMENT

B8

TURN IN SECTION

GLASS PARAPET WALL

1800

2

GENTS TOILET

1350

RCC COL. IN ELEVATION

AC UNIT

LVL +1330 T.O.C LVL +1275

CORRIDOR

650

RCC COL. IN ELEVATION

B7

W1

LIFT SHAFT

75 RCC SLAB AS/STR.DRG.

W1a

MUMTY T.O.C +14000

NOTES NOTES:1. ALL DIMENSIONS ARE IN MM. UNLESS NOTED OTHERWISE. 2. DO NOT SCALE ANY DIMENSIONS. 3. ANY DISCREPANCY IN THIS DRG. SHALL BE BROUGHT TO THE NOTICE OF ARCHITECT. 4. FOR TOILETS, KITCHEN , ST. CASE & BALCONY REFER DETAIL DRAWINGS. 5. FOR ANY DISCRIPENCY BETWEEN ARCHITECTURE DRG. & STRUCTURE DRG. REFER CONSULTANT BEFORE PROCEEDING. 6. FOR CUT OUT LOCATIONS, DRG. TO BE COORDINATED WITH WITH STRUCTURE AND ALL RELEVANT SERVICES DRG. 7. KEEP LIFT DOOR OPENING SIZE AS/VENDOR'S /MANUFACTURE'S REQUIREMENTS

2500 WIDE PASSAGE

T.O.C LVL +1200

RCC COL. IN ELEVATION

230 785

SHOP 2

VOID.

PLANTER

600

W1

DW1

DW1

2400

W1

3625

W1

3400

MULTIPURPOSE HALL

230 LVL +1330

175

650 FOLDING PARTITION

W1

LIFT SHAFT B.O.S +15300

TERRACE LVL. LVL. +10650

FIRST FL. LVL. LVL. +5400

RCC SLAB AS/STR.DRG.

4050

W1

200 MM SUNK

TERRACE TOC +17000

LVL. +10800

PARAPET WALL

4050

4050

COFEE LOUNGE

W1

GENTS TOILET

DECK

7515

LIBRARY/READING HALL W1

3000

1550 5250

W1A

OPEN TERRACE

W1

1350

500 1200

1200

W1A

GRC JALLI SCREEN WALL

10650

W1A

1650

W1A

1000

W1A

3750

W1A

5250

RCC SLAB AS/STR.DRG.

3465

3465

GRC JALLI AS/ DETAIL

W1A

AC UNIT

GRC JALLI AS/DETAIL

300

BOFC.

W1A

785

AC UNIT

VOID

T. V. LOUNGE

ROAD LVL +900

SPACE FOR AC OUTDOOR UNITS

TERRACE LVL. LVL. +10650

2700

SWIMMING POOL

1200

600

KIDS POOL

900

1785

150 150 300

600

500

TERRACE

2385

1200

DETAIL D1

1200

500

1200 HIGH PARAPET WALL

DETAIL-02

1550

230

WALL

1:100 14.03.2019 YASHASH

SUMIT JAIN

CLUB HOUSE SECTIONS & DETAILS PLOT -A (PRIMERA )

RP/CLUB/A/03


YASHASH KANOJIA thank you for your time !


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.