YASIR NASEEM MSC. ARCH. ENGG. BSC. ARCH. ENGG. M. PEC


BUKHSH ALLIED HEALTH SCIENCES SCHOOL JHELUM, PAKISTAN 2017 TYPE: EDUCATIONAL DESIGNATION: PROJECT DESIGNER ROLE: ARCHITECTURAL DRAWINGS, PROJECT COORDINATION CONSULTANTS: SHEHERSAAZ PVT. LTD CLIENT: MIAN MUHAMMAD BUKHSH TRUST

GROUND FLOOR PLAN

FIRST FLOOR PLAN

FRONT ELEVATION

BACK ELEVATION


OMAN SITE OFFICE BUILDING COMPLEX SULTANATE OF OMAN 2017 TYPE: OFFICE BUILDING DESIGNATION: PROJECT DESIGNER ROLE: WORKING DRAWINGS, PROJECT COORDINATION CONSULTANTS: SHEHERSAAZ PVT. LTD CLIENT: SULTANATE OF OMAN

GROUND FLOOR

THIRD FLOOR


ADDITION SINGLE STOREY REAR EXTENSION TOTO HOUSE SINGLE OF STOREY REAR EXTENSION HOUSE LONDON

LONDON, UK TYPE: RESIDENCE DESIGNATION: PROJECT DESIGNER

ROLE: SUBMISSION DRAWINGS FOR THE ADDITION TO THE LOFT CONSULTANTS: SHEHERSAAZ PVT. LTD CLIENT: PRIVATE

REAR ELEVATION

GROUND FLOOR PLAN

FIRST FLOOR PLAN

LOFT FLOOR PLAN

SECTION A-A


BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 TYPE: HEALTH CARE 55 BED CHARITY HOSPITAL DESIGNATION: PROJECT COORDINATOR ROLE: WORKING DRAWINGS, PROJECT SUPERVISION, BUILDING SYSTEMS INTEGRATION CONSULTANTS: SHEHERSAAZ PVT. LTD CLIENT: MIAN MUHAMMAD BUKHSH TRUST


BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 5

6

12' - 0"

7

12' - 0" 3' - 0"

0' - 9"

0' - 9" 0' - 3"

1' - 6"

2' - 8"

13' - 4 3/4"

1' - 6"

1' - 10 1/2" 32

0' - 9"

29

29

2' - 2"

0' - 9" 0' - 3"

2' - 8"

1' - 7 1/2"

3' - 0"

1' - 8"

4' - 0"

25

1' - 6"0' - 4 1/2"

3' - 6"

26

0' - 10 1/2"

2' - 8"

27

0' - 4 1/2" 0' - 9"

0' - 3 1/2" 0' - 9" 2' - 8"

2' - 3"

1' - 6"

3' - 6"

23

23

1' - 0"

0' - 4 1/2" 1' - 6" 2' - 0"

27

1' - 8"

2' - 8"

28

2' - 9"

2' - 8"

23

2' - 0"

2' - 0"

23

10' - 6"

1' - 6"

4' - 9"

0' - 9"

33

5' - 0"

1' - 6" 0' - 9"

3' - 0"

6' - 9"

0' - 9"0' - 9"

0' - 4 1/2"

0' - 9"

3' - 0"

2' - 6 1/4" 0' - 4 1/2"

5' - 0"

0' - 4 1/2"

5' - 0"

0' - 4 1/2" 3' - 1 1/2"

25

26

0' - 6" 0' - 3"

17' - 3"

0' - 9"

17' - 9"

MAJOR O.T.

EMERGENCY MALE WARD

2' - 0" 0' - 3"

25

24

23

6' - 3 7/8"

1' - 6"

5' - 10 1/8"

3' - 0"

1' - 8"

3' - 0"

6' - 11 7/8"

1' - 6"

4' - 2 7/8"

3' - 0"

1' - 8"

3' - 0"

0' - 4 1/2"

29

5' - 1 1/8"

1' - 0" 0' - 6"

34

4' - 10"

5' - 2"

1' - 6"

5' - 8"

4' - 10"

---

35

1' - 6" 4' - 10"

5' - 9 1/2"

14' - 6"

EMERGENCY DEPARTMENT

-

0' - 4 1/2"

3' - 7 5/8"

2' - 6"

DUMB WAITOR

3' - 9"

0' - 4 1/2"

0' - 3"

28

0' - 9" 0' - 9"

27

0' - 3" 0' - 9"

0' - 3"

22

3' - 0"

4' - 4 3/8"

1' - 6"

2' - 0" 0' - 3"

36

LOBBY

MINOR O.T.

28

27

15' - 1 1/2"

3' - 0"

21

0' - 4 1/2"

29

6' - 0 1/2"

2' - 2 1/2"

6' - 0 1/2"

1' - 1 1/4" 1' - 6" 0' - 7"

4' - 10"

5' - 1"

1' - 6"

10' - 6"

1' - 6"

10' - 6"

0' - 9"0' - 9"

19

4

18 1

1' - 6"

12

0' - 3" 1' - 9" 1' - 6"

13

10

3' - 6"

0' - 9" 0' - 3"

13' - 6"

5' - 1 1/2"

1' - 0"

0' - 9"

0' - 9"

7' - 0"

0' - 3"

14

9

2' - 10 1/2"

15

8

UP

10' - 0"

7

0' - 9"

9

0' - 9" 0' - 3 3/4" 0' - 5 1/4"

5' - 9"

16

5' - 9"

5' - 0" 9' - 0"

0' - 9"

0' - 3"

0' - 9"

0' - 9"

0' - 9"

8

4' - 0"

7

6

5

8' - 0"

4

3

2

1

GROUND FLOOR PLAN 11' - 6"

UP

1/8 " = 1'

0' - 7 1/2" 0' - 4 1/2"

1' - 0"

4' - 9"

5' - 10"

F

0' - 9"0' - 9"

1' - 6"

17

6

11

SERVICE DUCT

5' - 4"

8' - 0"

0' - 6 1/2"

0' - 6 3/4"

E

5

---

16' - 9 1/32"

4' - 4 1/2" 0' - 9"

6' - 9"

10' - 0"

32

34 5' - 0"

9' - 4 1/2"

9' - 11 1/2"

2

0' - 6"0' - 9"

39

1' - 0"

0' - 7 1/2"

3

2' - 6"

0' - 3" 1' - 1 1/4"

3

LIFT WELL

37

0' - 4 1/2" 0' - 6"

2' - 4 1/2"

20

3' - 8 1/2"

0' - 3"

2

31 3' - 8"

0' - 9"

4

TOILETS 0' - 6"

0' - 3" 1' - 9"

21

0' - 3"

30

0' - 4 1/2"

UP

7' - 11 1/4"

5

40

0' - 4 1/2"

6

22

1

7' - 0"

EMERGENCY FEMALE WARD

5' - 9"

7

1' - 0 1/4"

0' - 4 1/2"

4' - 6 3/8"

8

0' - 9"

0' - 9"0' - 9"

5' - 0"

25' - 0"

19' - 2"

3' - 6"

0' - 6 3/4"

5' - 0"

0' - 6 3/4"

32

1' - 3"

8' - 0"

6' - 0"

5' - 8 1/2"

18' - 0"

0' - 4 1/2" 1' - 3"

3' - 8"

34

9

RECEPTION & WAITING

0' - 9"

0' - 9"

41

2' - 11 1/8"

7' - 0"

8' - 0"

42

DN 8' - 3"

0' - 3" 1' - 9"

6' - 4 1/2"

3' - 0"

1' - 5"

8' - 3"

0' - 6"

0' - 9"

1' - 6"

1' - 6"

D

0' - 9" 0' - 9"

0' - 3"

1' - 1 1/4"

4' - 4 1/4"

8' - 11"

7' - 0"

20' - 0"

7' - 11 1/8"

20

4' - 4 1/4"

2' - 6"

0' - 3"

129

3' - 0"

0' - 4 1/2" 0' - 10 1/2" 3' - 0"

0' - 9"

0' - 3"

CONSULTANT ROOM 5

9' - 11 3/4"

21

22

CONSULTANT ROOM 3

20

9' - 11 3/4"

19

9' - 11 1/2"

CONSULTANT ROOM 2

9' - 11 1/2"

9' - 11 1/2"

18

FEMALE TOILET

CONSULTANT ROOM 1

CONSULTANT ROOM 4

0' - 3"

0' - 3"

0' - 9" 0' - 9"

0' - 9"

21' - 9"

5' - 6"

17' - 1 1/2"

24

2' - 6"

0' - 4 1/2"

0' - 4 1/2" 0' - 4 1/2"

5' - 0"

2' - 6 1/4"

2' - 6 1/4" 0' - 4 1/2"

2' - 6"

5' - 5"

5' - 0"

23

0' - 4 1/2" 0' - 4 1/2" 2' - 6"

5' - 6"

0' - 4 1/2"

0' - 4 1/2" 0' - 4 3/4"

0' - 4 1/2"

4' - 7 1/2" 0' - 4 3/4" 0' - 4 1/2" 2' - 6"

2' - 6"

0' - 6" 0' - 3"

5' - 0"

19

4' - 7 1/2"

15

5' - 1 1/2"

0' - 4 1/2"

18 0' - 9"

0' - 4 1/2"

17

MALE TOILET

5' - 1 1/2" 0' - 4 1/2"

17 0' - 3" 0' - 4 1/2" 2' - 6"

2' - 6 1/4"

2' - 6 1/4" 2' - 11 1/4"

2' - 6"

0' - 4 1/2" 5' - 5"

5' - 9"

0' - 4 1/2" 3' - 0 3/4"

14 2' - 6"

0' - 9"0' - 9"0' - 9"

16' - 0"

DUMB WAITOR

28

16

C

3' - 10 1/2"

0' - 9"

23

0' - 4 1/2" 0' - 4 3/4"

0' - 4 1/2"

4' - 3"

1' - 6"

16' - 0"

0' - 9" 0' - 3"

25

4' - 0"

B

0' - 4 1/2" 0' - 9" 0' - 9" 3' - 0"

4' - 9"

0' - 9" 0' - 9"0' - 9"

29

0' - 2"

4' - 6"

6' - 0"

0' - 9"

2' - 9"

0' - 9"

0' - 4 1/2"

30

A

JANITOR

5' - 5 1/4"

0' - 10 1/8"

3' - 10 1/2" VOID

4' - 10 1/2"

26 2' - 6"

2' - 9"

0' - 9"

LAUNDARY CHUTE

4' - 10 1/2"

0' - 9" 0' - 3" 0' - 3" 0' - 6"

4' - 6"

0' - 4 1/2" 3' - 0 3/4"

0' - 9" 0' - 9"

4' - 6"

0' - 5 1/8" 0' - 9"

0' - 3"

0' - 9"0' - 9"

0' - 4 1/2"

0' - 3 1/4" 0' - 9"

TOILET

2' - 6"

3

3' - 6" GARBAGE CHUTE

0' - 9"

SOFTWARE: AUTODESK REVIT

2

8' - 0"

31

1

23

2' - 6"

31

0' - 4 1/2" 2' - 0"

0' - 7 1/4"

0' - 9"

0' - 6" 2' - 5 1/4"

12' - 0"

5' - 9"

18' - 0"

0' - 3" 2' - 7 1/2" 0' - 3"

DRAWING TYPE: WORKING DRAWINGS

22' - 0"

0' - 4 1/2" 2' - 0" 0' - 9"

4 22' - 0"


BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 5

6

10' - 6"

0' - 3" 0' - 9" 2' - 3 3/8"

12' - 0"

7' - 0"

2' - 2 5/8" 0' - 9"

3' - 5 1/4"

0' - 4 1/2" 3' - 0 3/4"

0' - 9"

3' - 10 1/2"

0' - 9"

0' - 9"0' - 9"

7

12' - 0"

GARBAGE CHUTE

LAUNDARY CHUTE

VOID

DIRTY CORRIDOR

0' - 9" 0' - 6"

3' - 0"

1' - 1 1/8"

0' - 9"

3' - 0"

1' - 4 7/8" 1' - 6"

0' - 9"

DUMB WAITOR

7' - 9"

0' - 3"

1' - 6"

A

4' - 10 1/2"

3

0' - 9"

2

48

7' - 3"

1

SOFTWARE: AUTODESK REVIT

0' - 9"

5' - 9"

12' - 0"

2' - 0" 0' - 3"

18' - 0"

2' - 3"

0' - 6" 0' - 9"

0' - 7 1/2" 0' - 7 1/2"

DRAWING TYPE: WORKING DRAWINGS

22' - 0"

0' - 4 1/2" 2' - 0" 0' - 9"

4 22' - 0"

4' - 6"

20' - 6"

17' - 1 1/2"

39

0' - 4 1/2"

5' - 2 5/8"

0' - 4 1/2"

5' - 4"

0' - 9"

7' - 3 7/8"

0' - 4 1/2"

0' - 4 1/2"

40

0' - 4 1/2"

5' - 0"

0' - 9"

7' - 9"

1' - 6"

CORRIDOR

47

46

7' - 9 1/2"

4' - 9 1/2"

0' - 7 7/8"

1' - 11 1/8" 0' - 9"0' - 9"0' - 6"

5' - 4"

13' - 9"

6' - 2 3/4"

1' - 6"

2' - 1"

4' - 10"

3' - 7"

1' - 6" 0' - 6"

3' - 0"

0' - 5 1/8"

6' - 6 7/8"

4' - 5 1/4" 0' - 9" 0' - 9"

2' - 0" 0' - 3" 0' - 3"

0' - 9" 4' - 4 1/2"

14

9

13

12

0' - 6 13/16"

0' - 6 13/16" 1' - 6 7/16"

0' - 6 3/4" 1' - 6 13/32"

0' - 6 3/4"

0' - 9" 1' - 5"

1' - 6 7/16"

1' - 6 7/16"

0' - 9"

3' - 0"

2' - 0"

3' - 0"

0' - 3" 1' - 3" 0' - 11"

0' - 7"

3' - 6"

1' - 3 3/4"

5' - 1 1/4"

0' - 3" 0' - 7 1/2"

10' - 6"

0' - 7 1/2"

FIRST FLOOR PLAN

18' - 0"

---

2' - 6" 0' - 9"

2' - 8"

0' - 3"

0' - 3" 0' - 2 5/32"

0' - 9"

12' - 1 1/2"

18' - 2 1/8"

W.C.

13' - 8"

0' - 4 7/8"

0' - 7 1/8"

1/8 " = 1'

3' - 3" 0' - 3"

0' - 3"

42

SHOWER

0' - 3"

3' - 3"

0' - 3"

3' - 6"

0' - 3"

0' - 3"

2' - 0"

0' - 3" 0' - 6"

0' - 3"

2' - 0" 0' - 4 15/16"

0' - 9" 0' - 9"

0' - 3" 0' - 5"

SECOND STAGE LABOUR

43

0' - 6 1/32"

4' - 2 31/32" 0' - 3" 2' - 0"

SHOWER

FIRST STAGE LABOUR

3' - 6"

10' - 0 13/32"

0' - 3"

8' - 6 3/4"

0' - 3"

11' - 6"

LADIES TOILET

1' - 4 5/8"

0' - 6 3/4"

5' - 1 1/2"

13' - 0"

0' - 6 3/4"

1' - 6 7/16"

0' - 9"

11

0' - 9"

1' - 6 13/32"

0' - 9"

8

10

17' - 7 1/4"

50

3' - 3 3/8"

15

0' - 9"

W.C.

16

7

6' - 1 3/4"

1' - 3"

3' - 3"

1' - 3"

3' - 3"

1' - 3"

3' - 6"

0' - 9"

0' - 3" 0' - 7 1/2"

0' - 7 1/2"

10' - 6"

0' - 3" 0' - 7 1/2"

2' - 0" 0' - 3"

0' - 7 1/2"

0' - 7 1/2"

17

0' - 4 1/2"

0' - 3"

18

5

4' - 3 1/4"

CHANGE

2' - 4 1/2"

19

4

0' - 9"

0' - 3"

20

3

4' - 3 1/2"

CHANGE

1' - 3 1/4"

0' - 6 13/16" 1' - 6 13/32"

1' - 2 1/4"

0' - 1"

5' - 4"

0' - 3"

3' - 0"

0' - 9" 2

10' - 0"

9' - 11 1/4" 0' - 6 3/4" 0' - 6 3/4" 1' - 6 5/16"

18' - 8"

0' - 3"

0' - 9" 1' - 3 1/4"

1' - 1 1/2" 0' - 4 3/4" 0' - 4 1/2" 2' - 6"

21

5' - 9"

6' - 6 1/2"

5' - 9 1/2" 0' - 3" 0' - 9" 0' - 9"

0' - 6 3/4"

3' - 8 1/2"

0' - 9"

LIFT WELL

SERVICE DUCT

1' - 6 9/16"

5' - 0"

22

E

0' - 6 3/4"

3' - 6"

1

6

0' - 6"1' - 4"

DOCTOR'S ROOM

0' - 3" 1' - 9"

5' - 0"

0' - 4 1/2" 1' - 2 3/4" 0' - 4 3/4" 1' - 1 1/4" 0' - 4 1/2" 2' - 6" 0' - 4 1/2"

GENTS TOILET

UP

37

1' - 7 3/16"

2' - 0" 0' - 3"

41

3' - 0"

0' - 4 1/2" 2' - 6"

1' - 3"

18' - 8 1/2"

18' - 8 1/2"

6' - 0"

WAITING HALL

0' - 9"

1' - 1 1/2"

CORRIDOR CORRIDOR

10' - 7 5/8"

5' - 0"

DUMB WAITOR

3' - 9"

0' - 3"

9' - 1 1/2"

0' - 7 1/2" 0' - 7 1/2"

2' - 3"

10' - 0 3/4"

2' - 6" 0' - 4 1/2"

38

2' - 6"

0' - 9"

12' - 6 7/8"

OPERATION THEATER 2

0' - 3"

1' - 6"

0' - 3" 0' - 6" 0' - 6"

7' - 9"

0' - 4 1/2" 1' - 3"

0' - 3"

5' - 4"

45

49

2' - 10"

0' - 9"

STERILE ROOM

19' - 0"

0' - 3"

4' - 10 1/8"

34

6' - 5 1/4"

18' - 0"

0' - 6 5/8" 0' - 4 1/2"

44

0' - 9"

8' - 0"

5' - 4"

OPERATION THEATER 1

SCRUB UP AREA

-

F

5' - 5 7/8"

OBSTETRICS WARD

---

D

0' - 9"0' - 9"

0' - 4 1/2"

36

0' - 6 5/8"

6' - 7 1/2"

16' - 6"

0' - 9"

2' - 6"

0' - 6"

1' - 6"

0' - 8 5/8"

22' - 0"

14' - 6"

16' - 0"

0' - 9"

0' - 2 7/8"

0' - 7 5/8"

33

0' - 3 7/8"

TOILET

31' - 3"

1' - 6"

GYNAE WARD

8' - 0"

0' - 9"

2' - 6" 0' - 4 7/8"

2' - 6"

14' - 6"

16' - 0"

C

6' - 7 1/2"

0' - 4 1/2"

0' - 4 1/2"

5' - 0"

3' - 6"

4' - 9"

7' - 0"

0' - 4 1/2"

0' - 3"

0' - 6"

4' - 6"

4' - 8 1/4"

0' - 6"

12' - 0"

1' - 6"

0' - 4 1/2"

8' - 6"

2' - 6"

0' - 9"

8' - 11 1/2"

3' - 9"

B

0' - 9"

0' - 9"

1' - 7 1/8"

35

3' - 0"

1' - 1 5/8"

1' - 6" 0' - 10"

TOILET

12' - 0"

0' - 4 1/2"

0' - 9" 1' - 2 1/2"

0' - 4 5/8" 0' - 4 7/8"

2' - 2"

0' - 4 7/8"

0' - 9"

0' - 6"

3' - 7 1/2"

1' - 6" 0' - 9"

0' - 9" 0' - 9"

0' - 3 1/2"

6' - 0"

0' - 9" 0' - 9" 2' - 3" 2' - 0" 0' - 4 3/8"


BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 A

B

C

D

E

DRAWING TYPE: WORKING DRAWINGS

F

11/2" TH. BRICK TILES ROOFING, JOINTED & GROUTED IN CEMENT SAND MORTAR (1:3) 3" TO 4" MUD PLASTER LAID ON FALL

:ONE LAYER OF POLYTHENE SHEET

2' - 0"

2' - 0"

1" THICK THERMOPORE SHEET OF HIGH DENSITY ONE LAYER OF POLYTHENE SHEET 2-COATS OF HOT BITUMEN PB-3 OR PB-4 ON R.C.C. ROOF SLAB (1:2:4)

Upper Roof 64' - 0"

1' - 6"

SOFTWARE: AUTODESK REVIT

STAIR CASE 1/2'' THICK FLOOR FINISH ON 2" THICK P.C.C. (1:2:4) ON 3'' BRICK BALLASTS ON R.C.C. SLAB

2' - 6"

:

9' - 0"

11/2" TH. BRICK TILES ROOFING, JOINTED & GROUTED IN CEMENT SAND MORTAR (1:3) 3" TO 4" MUD PLASTER LAID ON FALL ONE LAYER OF POLYTHENE SHEET 1" THICK THERMOPORE SHEET OF HIGH DENSITY ONE LAYER OF POLYTHENE SHEET 2-COATS OF HOT BITUMEN PB-3 OR PB-4 ON R.C.C. ROOF SLAB (1:2:4)

5' - 0"

:

5' - 0"

ACCOUNTS OFFICE

STAIR CASE

CORRIDOR

Third Floor 43' - 0"

TOILET

TOILET

TOILET

12' - 0"

12' - 0"

2' - 6"

1' - 6"

2' - 0"

3' - 0"

7' - 0"

:

1/2'' THICK FLOOR FINISH ON 2" THICK P.C.C. (1:2:4) ON 3'' BRICK BALLASTS ON R.C.C. SLAB

12' - 0"

2' - 6"

1' - 6"

Lower Roof 55' - 0"

STAIR CASE

TOILET

:

1/2'' THICK FLOOR FINISH ON 2" THICK P.C.C. (1:2:4) ON 3'' BRICK BALLASTS ON R.C.C. SLAB

2' - 7"

7' - 0"

8' - 0"

LOBBY

TOILET

TOILET

12' - 0"

TOILET

TOILET

STAIR CASE

:

1/2'' THICK FLOOR FINISH ON 2" THICK P.C.C. (1:2:4) ON 3'' BRICK BALLASTS ON R.C.C. SLAB

2' - 7"

7' - 0"

CORRIDOR

8' - 0"

12' - 0"

2' - 6"

1' - 6"

Second Floor 31' - 0"

STAIR CASE

Ground Floor 7' - 0"

5' - 0" 3' - 0"

2' - 0"

5' - 0"

1' - 6"

1' - 6"

2' - 7"

12' - 0"

1' - 2" RECEPTION & WAITING

8' - 0"

1/2'' THICK FLOOR FINISH ON 2" THICK P.C.C. (1:2:4) ON 3'' BRICK BALLASTS ON R.C.C. SLAB

3' - 0"

:

4' - 0"

CONSULTANT ROOM

TOILET

7' - 0"

12' - 0"

1' - 0"

2' - 6"

1' - 6"

First Floor 19' - 0"

Driveway Level 2' - 0" STAIR CASE

7' - 0"

2' - 7"

1" THICK FLOOR FINISH 2" THICK P.C.C. (1:2:4) 6" THICK BRICK BALLAST'S 3" THICK SAND FILLING ON : WELL COMPACTED EARTH

5' - 5"

RECEPTION & WAITING

TOILET

7' - 0"

LINK PASSAGE

SECTION B 3/8" = 1'

0' - 6" 1' - 0"

4' - 0"

Basement -5' - 0"

Top of Footing -9' - 0"


BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 DRAWING TYPE: GROUND FLOOR ROOM LEGEND SOFTWARE: AUTODESK REVIT

4

1

2

5

3

6

7

TOILET

Room Legend

26

A

CONSULTANT ROOM 1

C

20

21

CONSULTANT ROOM 2

EMERGENCY MALE WARD

MAJOR O.T.

24

25

CONSULTANT ROOM 5 EMERGENCY DEPARTMENT EMERGENCY DEPARTMENT

LOBBY

MINOR O.T.

28

27

29

F

EMERGENCY FEMALE WARD EMERGENCY MALE WARD LOBBY

D

E

CONSULTANT ROOM 3 CONSULTANT ROOM 4

23

CONSULTANT ROOM 5

19

22

CONSULTANT CONSULTANT CONSULTANT ROOM 1 ROOM 2 ROOM 3

CONSULTANT ROOM 4

18

FEMALE TOILET

17

MALE TOILET

B

MAJOR O.T. MINOR O.T.

RECEPTION & WAITING

EMERGENCY FEMALE WARD

TOILETS

32

30

31

RECEPTION & WAITING


BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 DRAWING TYPE: CUT THROUGH ISOMETRIC GROUND FLOOR SOFTWARE: AUTODESK REVIT

GYNAE WARD

OBSTETRICS WARD O.T. 1 CORRIDOR

WAITING HALL

O.T.2

CIRCULATION

SERVICE DUCT

SCRUB UP AREA GENTS

LADIES DRs ROOM FIRST STAGE LABOUR SECOND STAGE LABOUR


BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 DRAWING TYPE: DISPLACED CUT THROUGH ISOMETRIC OF ALL FLOORS SOFTWARE: AUTODESK REVIT


MARVEL TOWER JHELUM, PAKISTAN 2017 TYPE: MULTI-PURPOSE COMMERCIAL ROLE: COMPLETE ARCHITECTURAL DESIGN AND DETAILING. BUILDING SERVICES LAYOUT DESIGN. DAYLIGHT STUDIES. SOFTWARE: REVIT CONSULTANTS: SHEHER SAAZ PVT LTD

TYPICAL FLOOR PLAN

SECTION THROUGH STAIRS


MARVEL TOWER JHELUM, PAKISTAN 2017 TYPE: MULTI-PURPOSE COMMERCIAL ROLE: COMPLETE ARCHITECTURAL DESIGN AND DETAILING. BUILDING SERVICES LAYOUT DESIGN. DAYLIGHT STUDIES. SOFTWARE: REVIT CONSULTANTS: SHEHER SAAZ PVT LTD

CUT THROUGH PERSPECTIVE SECTION


HOUSE AT SECTOR G-10 ISLAMABAD, PAKISTAN 2017 TYPE: RESIDENTIAL ROLE: ARCHITECTURAL DESIGN AND DETAILING. BUILDING SERVICES DESIGN. SOFTWARE: REVIT CONSULTANTS: SHEHER SAAZ PVT LTD

SECTION PLAN


ZAM ZAM SOCIETY LAHORE, PAKISTAN TYPE: HOUSING SOCIETY (110 ACRES) ROLE: MASTERPLANNING, RESIDENTIAL LAYOUR AND DETAILED DESIGN CONSULTANTS: LANDMARK CONSULTANTS

APARTMENT TOWER LAYOUT

LAYOUT PLAN


APCO TOWER RAWALPINDI , PAKISTAN TYPE: OFFICES AND COMMERCIAL TOWER ROLE: ARCHITECTURAL DESIGN DETAILING DESIGN CONSULTANTS: LANDMARK CONSULTANTS

SECTION

PLANS


IT TOWER LAHORE , PAKISTAN TYPE: COMMERCIAL TOWER ROLE: ARCHITECTURAL DESIGN, BUILDING SERVICES INTEGRATION CONSULTANTS: LANDMARK CONSULTANTS

PLANS


AZAM CLOTH MARKET LAHORE , PAKISTAN TYPE: COMMERCIAL ROLE: ARCHITECTURAL DESIGN DETAIL DESIGN CONSULTANTS: LANDMARK CONSULTANTS

PLAN

SECTION


BROADWAY TOWER LAHORE , PAKISTAN TYPE: MIXED USE TOWER ROLE: ARCHITECTURAL DESIGN DETAIL DESIGN CONSULTANTS: LANDMARK CONSULTANTS

PLANS

TOWER 1

TOWER 3

TOWER 2

MASTERPLAN IN CONTEXT

SECTIONAL ELEVATION


MSC. ARCHITECTURAL ENGINEERING THESIS THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY TYPE: ACADEMIC Advisor: Prof. Massimo Tadi POLITECHNICO DI MILANO ITALY 2013 Design of a wellness center and basic health facilities for refurbishment and new addition to the historic silk factory building. Focus on creation of a sustainable-transformation scheme for the city (Valmadrera, Italy) based on the Therapeutic and Eco-tourism vision integrating passive/technological solutions like earth sheltering, renewable energy, green envelope, effective lighting and ventilation tools, starting from the urban planning, integrating with the confined architectural and technological detailing.

URBAN ANALYSIS


SURFACE MAPPING

THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY

GROUND FLOOR PLAN


THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY

SECTION


THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY

3-D VIEWS


THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY

SECTION

MEDITATION ROOM SKIN DETAIL


THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY

MEDITATION ROOM

RETROFITTING OF HISTORIC STRUCTURE


THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY CONSERVATION OF FACADE AND PROPOSED INTERVENTION AFTER INVESTIGATION

SURFACE MAPPING

PROPOSED INTEVENTION BASED ON ICOMOS PRINCIPLES


NEW ADDITION TO THE DIOCESANO MUSEUM ,MILAN, ITALY ITALY TYPE: ACADEMIC COURSE: ARCHITECTURAL DESIGN STUDIO PROFESSOR MASSIMO TADI PROFESSOR FRANK NOLEDINI MSC. ARCHITECTURAL ENGINEERING UNIVERSITY: POLITECHNICO DI MILANO ITLAY


NEW ADDITION TO THE DIOCESANO MUSEUM , ITALY


NEW ADDITION TO THE DIOCESANO MUSEUM , ITALY


NEW ADDITION TO THE DIOCESANO MUSEUM , ITALY


ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY TYPE: ACADEMIC COURSE TITLE: TECHNOLOGICAL DESIGN MSC. ARCHITECTURAL ENGINEERING UNIVERSITY: POLITECHNICO DI MILANO ITLAY


ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY


ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY


ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY


ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY


ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY


ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY

Copper panel TECU

500 x 1200 mm

L curved profile Hilti

80 x 60 mm

C section purlin

50 x 80 mm

Braquet Hilti 60 x 60 mm Aluminium painted tube 100 x 75 mm

Steel Truss

11 8

12

+1250

Roof 2

10 9 7 6 5 4

3 2 1

12-Concrete Tile 15mm 11-Plastic support. Air gap 5mm 10-PVC Reinforced waterproof membrane. Index 4mm 9-Leveling Concrete layer 60mm thick 8-Polyster reinforced waterproof membrane. Index 4mm 7-OSB Board 12mm thick SipCasa 6-Expanded polystyrene foam 100mm thick SipCasa 5-OSB Board 12mm thick SipCasa 4-Air Gap 70mm thick - Flexible ceiling hangers by KNAUF 3-Rock wool by KNAUF 120mm thick 2-Vapor Barrier 1mm thick 1-Gypsum Plasterboard false ceiling by KNAUF12mm thick

1-Gypsum Plasterboard Screwed by KNAUF 12mm thick 2-Vapor Barrier by Isorain 1mm thick 3-Gypsum Plasterboard Screwed by KNAUF 12mm thick 4-Rock wool by KNAUF 25mm thick A-Galvanized steel profile by KNAUF 25mm thick 5-OSB Board 12mm thick SipCasa 6-Expanded polystyrene foam by SipCasa 150mm thick

Panel SIP by SipCasa

7-OSB Board 12mm thick SipCasa 8-Rock wool panel by KNAUF 120mm thick 9-Adhesive waterproof membrane. 1.5mm thick. By Nova 2 11 10 9

8

7

6

5 4 31 A

10-Air Gap 43mm thick. B: Profile L bolted to main steel structure. 40x40x2 by Hilti

C: Bracket bolted to concrete wall. 40x82x80 by Hilti

11-Fibrecement board Cladding by Cembrite 8mm thick

+800

1 2 3 4 5 6 7 8

9 10 11

1-Ceramic tiles size

300*300*8mm

2-Cement Mortar

12mm

3-Damtec Ceremic plus

3mm

4-Cement Mortar

12mm

5-Water Proof Membrane

2mm

6-GLULAM panels

25mm

7-Steel Girder 8-KNAUF Nonius Hanger

for CD 60*27

9-Rock wool by KNAUF

60mm

10-KNAUF ceiling Profiles

CD 60*27mm

11-Gypsum board by KNAUF

12mm thick

Blow-up Section A-A


ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY

2 8

7

6

5

4

3 1

1-Gypsum Plasterboard Screwed by KNAUF 12mm thick 2-Vapor Barrier by Isorain 1mm thick 3-Gypsum Plasterboard Screwed by KNAUF 12mm thick 4-Expanded polystyrene Block by ClimaBlock 60mm thick 5-Reinforced Concrete 150mm thick 6-Expanded polystyrene Block by ClimaBlock 120mm thick 7-Air Gap 43mm thick. A: Profile L bolted to main steel structure. 40x40x2 by Hilti

B: Bracket bolted to concrete wall. 40x82x80 by Hilti

8-Fibrecement board Cladding bolted to (8) by Cembrit 8mm thick

+100 1 2 3 4 5 6 7 8

9 10 11

12

Foam Glass

13 14 15

Metallic partition

- 150

1-Ceramic tiles 2-Cement Mortar 3-Damtec Ceremic plus 4-Cement Mortar

300*300*8mm 12mm 3mm 12mm

5-Gutex Thermal Floor 6-Extruded polystyrene sheet 7-Gutex Thermal Floor 8-PCC

20mm 20mm 20mm 100mm

9-Metal Decking

3mm

10-KNAUF Nonius Hanger

for CD 60*27

11-KNAUF Mineral wool

100mm

12-KNAUF Mineral wool 13-Rock wool by KNAUF 14-KNAUF ceiling Profiles

100mm 60mm CD 60*27mm

15-KNAUF Cement Plaster Board

12mm

- 250 1 2 3 4

5

6 7 8

1-PCC (1:2:4) 2-Sand fill 3-Water proof membrane with Primer 4-RCC (1:4:8) 5-Iglu' H27 by DALIFORM

200mm thick 500mm thick 4mm thick 500mm thick 500*500*270mm

6- Air Gap 7-PCC (1:4:8)

100mm


ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY

D

C

E

F 325

B

380

280

265

415

R2 - Roof Slab as per detail T-04

+12.50m

G 675

A

R2 - Roof as per detail T-04

PV Modules Louvers

60 60 70

R1- Green Roof as per detail T-08

140

Skylights +480

Adjoining Structure

30

+450

Expansion Joint

+495

65

190

50

WORKSPACE

F2 - Floor slab as per detail T-05

100

30 120

LOBBY

+800

130

+4.50m

5

140

220

W2 - Dry Wall as per detail T-02

320 350

660

F2 - Floor slab as per detail T-05

W3 - Curved wall as per detail T-03

140

30

310 340

220

WORKSPACE

LOBBY

+8.00m

F2 - Floor slab as per detail T-05

965

660

W2 - Dry Wall as per detail T-02

765

F2 - Floor slab as per detail T-05

80 60 60 60 50

Copper Panels

LOBBY

+1.00m

SKY COURT

220

RECEPTION AND WAITING

220

GUEST ROOM

320 350

F1 - Floor slab as per detail T-06 W1 - Dry Wall as per detail T-01

F1 - Floor slab as per detail T-06

51

50

+100

AIR INLET

W0 - RC retaining wall as per detail

PARKING

300 350

20

195

30

104

205

+/-0.00m

4M WIDE DRIVE WAY

-2.50m

B1 - Basement slab as per detail T-07

4M WIDE DRIVE WAY

-250

A

B

C

D

E

F

G


ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY

A

B

D

C

E

F

G R2 - Roof Slab as per detail T-04

+12.50m

Louvers

R2 - Roof as per detail T-04

Copper Panels 340

Elevator Otis HomeLift OP800

330

220 150

40

215

+8.00m

W3 - Curved wall as per detail T-03 Copper Panels

+800

R1- Green Roof as per detail T-08

STAIRS +625

310 350

Skylights +480

+450

Adjoining Structure

20

20

+4.50m

Expansion Joint

STAIRS

350 310

+275

20

ENTRY

+/-0.00m

STAIRS

220

CORRIDOR

+100

330

-75

-2.50m

W0 - RC retaining wall as per detail

MACHINE ROOM

ELEVATOR

DRIVE WAY

-250

A

F1 - Floor slab as per detail T-06

150

+1.00m

SERVICE ROOM

B

C

D

E

F

G

B1 - Basement slab as per detail T-07


ENVIRONMENTAL SIMULATION ECOTECT ANALYSIS, 2014 TYPE: ACADEMIC

ROLE: STUDIO INSTRUCTOR COURSE: ENVIRONMENTAL SIMULATION FALL 2014 AUTODESK ECOTECT SCHOOL OF ART, DESIGN & ARCHITECTURE, NUST


VISUALISATION AND SIMULATION REVIT ARCHITECTURE, 2015 TYPE: ACADEMIC

ROLE: STUDIO INSTRUCTOR TRAINING: VISUALISATON & SIMULATION REVIT ARCHITECTURE SCHOOL OF ART, DESIGN & ARCHITECTURE, NUST