YASIR NASEEM MSC. ARCH. ENGG. BSC. ARCH. ENGG. M. PEC
BUKHSH ALLIED HEALTH SCIENCES SCHOOL JHELUM, PAKISTAN 2017 TYPE: EDUCATIONAL DESIGNATION: PROJECT DESIGNER ROLE: ARCHITECTURAL DRAWINGS, PROJECT COORDINATION CONSULTANTS: SHEHERSAAZ PVT. LTD CLIENT: MIAN MUHAMMAD BUKHSH TRUST
GROUND FLOOR PLAN
FIRST FLOOR PLAN
FRONT ELEVATION
BACK ELEVATION
OMAN SITE OFFICE BUILDING COMPLEX SULTANATE OF OMAN 2017 TYPE: OFFICE BUILDING DESIGNATION: PROJECT DESIGNER ROLE: WORKING DRAWINGS, PROJECT COORDINATION CONSULTANTS: SHEHERSAAZ PVT. LTD CLIENT: SULTANATE OF OMAN
GROUND FLOOR
THIRD FLOOR
ADDITION SINGLE STOREY REAR EXTENSION TOTO HOUSE SINGLE OF STOREY REAR EXTENSION HOUSE LONDON
LONDON, UK TYPE: RESIDENCE DESIGNATION: PROJECT DESIGNER
ROLE: SUBMISSION DRAWINGS FOR THE ADDITION TO THE LOFT CONSULTANTS: SHEHERSAAZ PVT. LTD CLIENT: PRIVATE
REAR ELEVATION
GROUND FLOOR PLAN
FIRST FLOOR PLAN
LOFT FLOOR PLAN
SECTION A-A
BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 TYPE: HEALTH CARE 55 BED CHARITY HOSPITAL DESIGNATION: PROJECT COORDINATOR ROLE: WORKING DRAWINGS, PROJECT SUPERVISION, BUILDING SYSTEMS INTEGRATION CONSULTANTS: SHEHERSAAZ PVT. LTD CLIENT: MIAN MUHAMMAD BUKHSH TRUST
BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 5
6
12' - 0"
7
12' - 0" 3' - 0"
0' - 9"
0' - 9" 0' - 3"
1' - 6"
2' - 8"
13' - 4 3/4"
1' - 6"
1' - 10 1/2" 32
0' - 9"
29
29
2' - 2"
0' - 9" 0' - 3"
2' - 8"
1' - 7 1/2"
3' - 0"
1' - 8"
4' - 0"
25
1' - 6"0' - 4 1/2"
3' - 6"
26
0' - 10 1/2"
2' - 8"
27
0' - 4 1/2" 0' - 9"
0' - 3 1/2" 0' - 9" 2' - 8"
2' - 3"
1' - 6"
3' - 6"
23
23
1' - 0"
0' - 4 1/2" 1' - 6" 2' - 0"
27
1' - 8"
2' - 8"
28
2' - 9"
2' - 8"
23
2' - 0"
2' - 0"
23
10' - 6"
1' - 6"
4' - 9"
0' - 9"
33
5' - 0"
1' - 6" 0' - 9"
3' - 0"
6' - 9"
0' - 9"0' - 9"
0' - 4 1/2"
0' - 9"
3' - 0"
2' - 6 1/4" 0' - 4 1/2"
5' - 0"
0' - 4 1/2"
5' - 0"
0' - 4 1/2" 3' - 1 1/2"
25
26
0' - 6" 0' - 3"
17' - 3"
0' - 9"
17' - 9"
MAJOR O.T.
EMERGENCY MALE WARD
2' - 0" 0' - 3"
25
24
23
6' - 3 7/8"
1' - 6"
5' - 10 1/8"
3' - 0"
1' - 8"
3' - 0"
6' - 11 7/8"
1' - 6"
4' - 2 7/8"
3' - 0"
1' - 8"
3' - 0"
0' - 4 1/2"
29
5' - 1 1/8"
1' - 0" 0' - 6"
34
4' - 10"
5' - 2"
1' - 6"
5' - 8"
4' - 10"
---
35
1' - 6" 4' - 10"
5' - 9 1/2"
14' - 6"
EMERGENCY DEPARTMENT
-
0' - 4 1/2"
3' - 7 5/8"
2' - 6"
DUMB WAITOR
3' - 9"
0' - 4 1/2"
0' - 3"
28
0' - 9" 0' - 9"
27
0' - 3" 0' - 9"
0' - 3"
22
3' - 0"
4' - 4 3/8"
1' - 6"
2' - 0" 0' - 3"
36
LOBBY
MINOR O.T.
28
27
15' - 1 1/2"
3' - 0"
21
0' - 4 1/2"
29
6' - 0 1/2"
2' - 2 1/2"
6' - 0 1/2"
1' - 1 1/4" 1' - 6" 0' - 7"
4' - 10"
5' - 1"
1' - 6"
10' - 6"
1' - 6"
10' - 6"
0' - 9"0' - 9"
19
4
18 1
1' - 6"
12
0' - 3" 1' - 9" 1' - 6"
13
10
3' - 6"
0' - 9" 0' - 3"
13' - 6"
5' - 1 1/2"
1' - 0"
0' - 9"
0' - 9"
7' - 0"
0' - 3"
14
9
2' - 10 1/2"
15
8
UP
10' - 0"
7
0' - 9"
9
0' - 9" 0' - 3 3/4" 0' - 5 1/4"
5' - 9"
16
5' - 9"
5' - 0" 9' - 0"
0' - 9"
0' - 3"
0' - 9"
0' - 9"
0' - 9"
8
4' - 0"
7
6
5
8' - 0"
4
3
2
1
GROUND FLOOR PLAN 11' - 6"
UP
1/8 " = 1'
0' - 7 1/2" 0' - 4 1/2"
1' - 0"
4' - 9"
5' - 10"
F
0' - 9"0' - 9"
1' - 6"
17
6
11
SERVICE DUCT
5' - 4"
8' - 0"
0' - 6 1/2"
0' - 6 3/4"
E
5
---
16' - 9 1/32"
4' - 4 1/2" 0' - 9"
6' - 9"
10' - 0"
32
34 5' - 0"
9' - 4 1/2"
9' - 11 1/2"
2
0' - 6"0' - 9"
39
1' - 0"
0' - 7 1/2"
3
2' - 6"
0' - 3" 1' - 1 1/4"
3
LIFT WELL
37
0' - 4 1/2" 0' - 6"
2' - 4 1/2"
20
3' - 8 1/2"
0' - 3"
2
31 3' - 8"
0' - 9"
4
TOILETS 0' - 6"
0' - 3" 1' - 9"
21
0' - 3"
30
0' - 4 1/2"
UP
7' - 11 1/4"
5
40
0' - 4 1/2"
6
22
1
7' - 0"
EMERGENCY FEMALE WARD
5' - 9"
7
1' - 0 1/4"
0' - 4 1/2"
4' - 6 3/8"
8
0' - 9"
0' - 9"0' - 9"
5' - 0"
25' - 0"
19' - 2"
3' - 6"
0' - 6 3/4"
5' - 0"
0' - 6 3/4"
32
1' - 3"
8' - 0"
6' - 0"
5' - 8 1/2"
18' - 0"
0' - 4 1/2" 1' - 3"
3' - 8"
34
9
RECEPTION & WAITING
0' - 9"
0' - 9"
41
2' - 11 1/8"
7' - 0"
8' - 0"
42
DN 8' - 3"
0' - 3" 1' - 9"
6' - 4 1/2"
3' - 0"
1' - 5"
8' - 3"
0' - 6"
0' - 9"
1' - 6"
1' - 6"
D
0' - 9" 0' - 9"
0' - 3"
1' - 1 1/4"
4' - 4 1/4"
8' - 11"
7' - 0"
20' - 0"
7' - 11 1/8"
20
4' - 4 1/4"
2' - 6"
0' - 3"
129
3' - 0"
0' - 4 1/2" 0' - 10 1/2" 3' - 0"
0' - 9"
0' - 3"
CONSULTANT ROOM 5
9' - 11 3/4"
21
22
CONSULTANT ROOM 3
20
9' - 11 3/4"
19
9' - 11 1/2"
CONSULTANT ROOM 2
9' - 11 1/2"
9' - 11 1/2"
18
FEMALE TOILET
CONSULTANT ROOM 1
CONSULTANT ROOM 4
0' - 3"
0' - 3"
0' - 9" 0' - 9"
0' - 9"
21' - 9"
5' - 6"
17' - 1 1/2"
24
2' - 6"
0' - 4 1/2"
0' - 4 1/2" 0' - 4 1/2"
5' - 0"
2' - 6 1/4"
2' - 6 1/4" 0' - 4 1/2"
2' - 6"
5' - 5"
5' - 0"
23
0' - 4 1/2" 0' - 4 1/2" 2' - 6"
5' - 6"
0' - 4 1/2"
0' - 4 1/2" 0' - 4 3/4"
0' - 4 1/2"
4' - 7 1/2" 0' - 4 3/4" 0' - 4 1/2" 2' - 6"
2' - 6"
0' - 6" 0' - 3"
5' - 0"
19
4' - 7 1/2"
15
5' - 1 1/2"
0' - 4 1/2"
18 0' - 9"
0' - 4 1/2"
17
MALE TOILET
5' - 1 1/2" 0' - 4 1/2"
17 0' - 3" 0' - 4 1/2" 2' - 6"
2' - 6 1/4"
2' - 6 1/4" 2' - 11 1/4"
2' - 6"
0' - 4 1/2" 5' - 5"
5' - 9"
0' - 4 1/2" 3' - 0 3/4"
14 2' - 6"
0' - 9"0' - 9"0' - 9"
16' - 0"
DUMB WAITOR
28
16
C
3' - 10 1/2"
0' - 9"
23
0' - 4 1/2" 0' - 4 3/4"
0' - 4 1/2"
4' - 3"
1' - 6"
16' - 0"
0' - 9" 0' - 3"
25
4' - 0"
B
0' - 4 1/2" 0' - 9" 0' - 9" 3' - 0"
4' - 9"
0' - 9" 0' - 9"0' - 9"
29
0' - 2"
4' - 6"
6' - 0"
0' - 9"
2' - 9"
0' - 9"
0' - 4 1/2"
30
A
JANITOR
5' - 5 1/4"
0' - 10 1/8"
3' - 10 1/2" VOID
4' - 10 1/2"
26 2' - 6"
2' - 9"
0' - 9"
LAUNDARY CHUTE
4' - 10 1/2"
0' - 9" 0' - 3" 0' - 3" 0' - 6"
4' - 6"
0' - 4 1/2" 3' - 0 3/4"
0' - 9" 0' - 9"
4' - 6"
0' - 5 1/8" 0' - 9"
0' - 3"
0' - 9"0' - 9"
0' - 4 1/2"
0' - 3 1/4" 0' - 9"
TOILET
2' - 6"
3
3' - 6" GARBAGE CHUTE
0' - 9"
SOFTWARE: AUTODESK REVIT
2
8' - 0"
31
1
23
2' - 6"
31
0' - 4 1/2" 2' - 0"
0' - 7 1/4"
0' - 9"
0' - 6" 2' - 5 1/4"
12' - 0"
5' - 9"
18' - 0"
0' - 3" 2' - 7 1/2" 0' - 3"
DRAWING TYPE: WORKING DRAWINGS
22' - 0"
0' - 4 1/2" 2' - 0" 0' - 9"
4 22' - 0"
BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 5
6
10' - 6"
0' - 3" 0' - 9" 2' - 3 3/8"
12' - 0"
7' - 0"
2' - 2 5/8" 0' - 9"
3' - 5 1/4"
0' - 4 1/2" 3' - 0 3/4"
0' - 9"
3' - 10 1/2"
0' - 9"
0' - 9"0' - 9"
7
12' - 0"
GARBAGE CHUTE
LAUNDARY CHUTE
VOID
DIRTY CORRIDOR
0' - 9" 0' - 6"
3' - 0"
1' - 1 1/8"
0' - 9"
3' - 0"
1' - 4 7/8" 1' - 6"
0' - 9"
DUMB WAITOR
7' - 9"
0' - 3"
1' - 6"
A
4' - 10 1/2"
3
0' - 9"
2
48
7' - 3"
1
SOFTWARE: AUTODESK REVIT
0' - 9"
5' - 9"
12' - 0"
2' - 0" 0' - 3"
18' - 0"
2' - 3"
0' - 6" 0' - 9"
0' - 7 1/2" 0' - 7 1/2"
DRAWING TYPE: WORKING DRAWINGS
22' - 0"
0' - 4 1/2" 2' - 0" 0' - 9"
4 22' - 0"
4' - 6"
20' - 6"
17' - 1 1/2"
39
0' - 4 1/2"
5' - 2 5/8"
0' - 4 1/2"
5' - 4"
0' - 9"
7' - 3 7/8"
0' - 4 1/2"
0' - 4 1/2"
40
0' - 4 1/2"
5' - 0"
0' - 9"
7' - 9"
1' - 6"
CORRIDOR
47
46
7' - 9 1/2"
4' - 9 1/2"
0' - 7 7/8"
1' - 11 1/8" 0' - 9"0' - 9"0' - 6"
5' - 4"
13' - 9"
6' - 2 3/4"
1' - 6"
2' - 1"
4' - 10"
3' - 7"
1' - 6" 0' - 6"
3' - 0"
0' - 5 1/8"
6' - 6 7/8"
4' - 5 1/4" 0' - 9" 0' - 9"
2' - 0" 0' - 3" 0' - 3"
0' - 9" 4' - 4 1/2"
14
9
13
12
0' - 6 13/16"
0' - 6 13/16" 1' - 6 7/16"
0' - 6 3/4" 1' - 6 13/32"
0' - 6 3/4"
0' - 9" 1' - 5"
1' - 6 7/16"
1' - 6 7/16"
0' - 9"
3' - 0"
2' - 0"
3' - 0"
0' - 3" 1' - 3" 0' - 11"
0' - 7"
3' - 6"
1' - 3 3/4"
5' - 1 1/4"
0' - 3" 0' - 7 1/2"
10' - 6"
0' - 7 1/2"
FIRST FLOOR PLAN
18' - 0"
---
2' - 6" 0' - 9"
2' - 8"
0' - 3"
0' - 3" 0' - 2 5/32"
0' - 9"
12' - 1 1/2"
18' - 2 1/8"
W.C.
13' - 8"
0' - 4 7/8"
0' - 7 1/8"
1/8 " = 1'
3' - 3" 0' - 3"
0' - 3"
42
SHOWER
0' - 3"
3' - 3"
0' - 3"
3' - 6"
0' - 3"
0' - 3"
2' - 0"
0' - 3" 0' - 6"
0' - 3"
2' - 0" 0' - 4 15/16"
0' - 9" 0' - 9"
0' - 3" 0' - 5"
SECOND STAGE LABOUR
43
0' - 6 1/32"
4' - 2 31/32" 0' - 3" 2' - 0"
SHOWER
FIRST STAGE LABOUR
3' - 6"
10' - 0 13/32"
0' - 3"
8' - 6 3/4"
0' - 3"
11' - 6"
LADIES TOILET
1' - 4 5/8"
0' - 6 3/4"
5' - 1 1/2"
13' - 0"
0' - 6 3/4"
1' - 6 7/16"
0' - 9"
11
0' - 9"
1' - 6 13/32"
0' - 9"
8
10
17' - 7 1/4"
50
3' - 3 3/8"
15
0' - 9"
W.C.
16
7
6' - 1 3/4"
1' - 3"
3' - 3"
1' - 3"
3' - 3"
1' - 3"
3' - 6"
0' - 9"
0' - 3" 0' - 7 1/2"
0' - 7 1/2"
10' - 6"
0' - 3" 0' - 7 1/2"
2' - 0" 0' - 3"
0' - 7 1/2"
0' - 7 1/2"
17
0' - 4 1/2"
0' - 3"
18
5
4' - 3 1/4"
CHANGE
2' - 4 1/2"
19
4
0' - 9"
0' - 3"
20
3
4' - 3 1/2"
CHANGE
1' - 3 1/4"
0' - 6 13/16" 1' - 6 13/32"
1' - 2 1/4"
0' - 1"
5' - 4"
0' - 3"
3' - 0"
0' - 9" 2
10' - 0"
9' - 11 1/4" 0' - 6 3/4" 0' - 6 3/4" 1' - 6 5/16"
18' - 8"
0' - 3"
0' - 9" 1' - 3 1/4"
1' - 1 1/2" 0' - 4 3/4" 0' - 4 1/2" 2' - 6"
21
5' - 9"
6' - 6 1/2"
5' - 9 1/2" 0' - 3" 0' - 9" 0' - 9"
0' - 6 3/4"
3' - 8 1/2"
0' - 9"
LIFT WELL
SERVICE DUCT
1' - 6 9/16"
5' - 0"
22
E
0' - 6 3/4"
3' - 6"
1
6
0' - 6"1' - 4"
DOCTOR'S ROOM
0' - 3" 1' - 9"
5' - 0"
0' - 4 1/2" 1' - 2 3/4" 0' - 4 3/4" 1' - 1 1/4" 0' - 4 1/2" 2' - 6" 0' - 4 1/2"
GENTS TOILET
UP
37
1' - 7 3/16"
2' - 0" 0' - 3"
41
3' - 0"
0' - 4 1/2" 2' - 6"
1' - 3"
18' - 8 1/2"
18' - 8 1/2"
6' - 0"
WAITING HALL
0' - 9"
1' - 1 1/2"
CORRIDOR CORRIDOR
10' - 7 5/8"
5' - 0"
DUMB WAITOR
3' - 9"
0' - 3"
9' - 1 1/2"
0' - 7 1/2" 0' - 7 1/2"
2' - 3"
10' - 0 3/4"
2' - 6" 0' - 4 1/2"
38
2' - 6"
0' - 9"
12' - 6 7/8"
OPERATION THEATER 2
0' - 3"
1' - 6"
0' - 3" 0' - 6" 0' - 6"
7' - 9"
0' - 4 1/2" 1' - 3"
0' - 3"
5' - 4"
45
49
2' - 10"
0' - 9"
STERILE ROOM
19' - 0"
0' - 3"
4' - 10 1/8"
34
6' - 5 1/4"
18' - 0"
0' - 6 5/8" 0' - 4 1/2"
44
0' - 9"
8' - 0"
5' - 4"
OPERATION THEATER 1
SCRUB UP AREA
-
F
5' - 5 7/8"
OBSTETRICS WARD
---
D
0' - 9"0' - 9"
0' - 4 1/2"
36
0' - 6 5/8"
6' - 7 1/2"
16' - 6"
0' - 9"
2' - 6"
0' - 6"
1' - 6"
0' - 8 5/8"
22' - 0"
14' - 6"
16' - 0"
0' - 9"
0' - 2 7/8"
0' - 7 5/8"
33
0' - 3 7/8"
TOILET
31' - 3"
1' - 6"
GYNAE WARD
8' - 0"
0' - 9"
2' - 6" 0' - 4 7/8"
2' - 6"
14' - 6"
16' - 0"
C
6' - 7 1/2"
0' - 4 1/2"
0' - 4 1/2"
5' - 0"
3' - 6"
4' - 9"
7' - 0"
0' - 4 1/2"
0' - 3"
0' - 6"
4' - 6"
4' - 8 1/4"
0' - 6"
12' - 0"
1' - 6"
0' - 4 1/2"
8' - 6"
2' - 6"
0' - 9"
8' - 11 1/2"
3' - 9"
B
0' - 9"
0' - 9"
1' - 7 1/8"
35
3' - 0"
1' - 1 5/8"
1' - 6" 0' - 10"
TOILET
12' - 0"
0' - 4 1/2"
0' - 9" 1' - 2 1/2"
0' - 4 5/8" 0' - 4 7/8"
2' - 2"
0' - 4 7/8"
0' - 9"
0' - 6"
3' - 7 1/2"
1' - 6" 0' - 9"
0' - 9" 0' - 9"
0' - 3 1/2"
6' - 0"
0' - 9" 0' - 9" 2' - 3" 2' - 0" 0' - 4 3/8"
BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 A
B
C
D
E
DRAWING TYPE: WORKING DRAWINGS
F
11/2" TH. BRICK TILES ROOFING, JOINTED & GROUTED IN CEMENT SAND MORTAR (1:3) 3" TO 4" MUD PLASTER LAID ON FALL
:ONE LAYER OF POLYTHENE SHEET
2' - 0"
2' - 0"
1" THICK THERMOPORE SHEET OF HIGH DENSITY ONE LAYER OF POLYTHENE SHEET 2-COATS OF HOT BITUMEN PB-3 OR PB-4 ON R.C.C. ROOF SLAB (1:2:4)
Upper Roof 64' - 0"
1' - 6"
SOFTWARE: AUTODESK REVIT
STAIR CASE 1/2'' THICK FLOOR FINISH ON 2" THICK P.C.C. (1:2:4) ON 3'' BRICK BALLASTS ON R.C.C. SLAB
2' - 6"
:
9' - 0"
11/2" TH. BRICK TILES ROOFING, JOINTED & GROUTED IN CEMENT SAND MORTAR (1:3) 3" TO 4" MUD PLASTER LAID ON FALL ONE LAYER OF POLYTHENE SHEET 1" THICK THERMOPORE SHEET OF HIGH DENSITY ONE LAYER OF POLYTHENE SHEET 2-COATS OF HOT BITUMEN PB-3 OR PB-4 ON R.C.C. ROOF SLAB (1:2:4)
5' - 0"
:
5' - 0"
ACCOUNTS OFFICE
STAIR CASE
CORRIDOR
Third Floor 43' - 0"
TOILET
TOILET
TOILET
12' - 0"
12' - 0"
2' - 6"
1' - 6"
2' - 0"
3' - 0"
7' - 0"
:
1/2'' THICK FLOOR FINISH ON 2" THICK P.C.C. (1:2:4) ON 3'' BRICK BALLASTS ON R.C.C. SLAB
12' - 0"
2' - 6"
1' - 6"
Lower Roof 55' - 0"
STAIR CASE
TOILET
:
1/2'' THICK FLOOR FINISH ON 2" THICK P.C.C. (1:2:4) ON 3'' BRICK BALLASTS ON R.C.C. SLAB
2' - 7"
7' - 0"
8' - 0"
LOBBY
TOILET
TOILET
12' - 0"
TOILET
TOILET
STAIR CASE
:
1/2'' THICK FLOOR FINISH ON 2" THICK P.C.C. (1:2:4) ON 3'' BRICK BALLASTS ON R.C.C. SLAB
2' - 7"
7' - 0"
CORRIDOR
8' - 0"
12' - 0"
2' - 6"
1' - 6"
Second Floor 31' - 0"
STAIR CASE
Ground Floor 7' - 0"
5' - 0" 3' - 0"
2' - 0"
5' - 0"
1' - 6"
1' - 6"
2' - 7"
12' - 0"
1' - 2" RECEPTION & WAITING
8' - 0"
1/2'' THICK FLOOR FINISH ON 2" THICK P.C.C. (1:2:4) ON 3'' BRICK BALLASTS ON R.C.C. SLAB
3' - 0"
:
4' - 0"
CONSULTANT ROOM
TOILET
7' - 0"
12' - 0"
1' - 0"
2' - 6"
1' - 6"
First Floor 19' - 0"
Driveway Level 2' - 0" STAIR CASE
7' - 0"
2' - 7"
1" THICK FLOOR FINISH 2" THICK P.C.C. (1:2:4) 6" THICK BRICK BALLAST'S 3" THICK SAND FILLING ON : WELL COMPACTED EARTH
5' - 5"
RECEPTION & WAITING
TOILET
7' - 0"
LINK PASSAGE
SECTION B 3/8" = 1'
0' - 6" 1' - 0"
4' - 0"
Basement -5' - 0"
Top of Footing -9' - 0"
BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 DRAWING TYPE: GROUND FLOOR ROOM LEGEND SOFTWARE: AUTODESK REVIT
4
1
2
5
3
6
7
TOILET
Room Legend
26
A
CONSULTANT ROOM 1
C
20
21
CONSULTANT ROOM 2
EMERGENCY MALE WARD
MAJOR O.T.
24
25
CONSULTANT ROOM 5 EMERGENCY DEPARTMENT EMERGENCY DEPARTMENT
LOBBY
MINOR O.T.
28
27
29
F
EMERGENCY FEMALE WARD EMERGENCY MALE WARD LOBBY
D
E
CONSULTANT ROOM 3 CONSULTANT ROOM 4
23
CONSULTANT ROOM 5
19
22
CONSULTANT CONSULTANT CONSULTANT ROOM 1 ROOM 2 ROOM 3
CONSULTANT ROOM 4
18
FEMALE TOILET
17
MALE TOILET
B
MAJOR O.T. MINOR O.T.
RECEPTION & WAITING
EMERGENCY FEMALE WARD
TOILETS
32
30
31
RECEPTION & WAITING
BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 DRAWING TYPE: CUT THROUGH ISOMETRIC GROUND FLOOR SOFTWARE: AUTODESK REVIT
GYNAE WARD
OBSTETRICS WARD O.T. 1 CORRIDOR
WAITING HALL
O.T.2
CIRCULATION
SERVICE DUCT
SCRUB UP AREA GENTS
LADIES DRs ROOM FIRST STAGE LABOUR SECOND STAGE LABOUR
BUKHSH HOSPITAL - MIAN MUHAMMAD BUKHSH TRUST (NPO) JHELUM, PAKISTAN 2017 DRAWING TYPE: DISPLACED CUT THROUGH ISOMETRIC OF ALL FLOORS SOFTWARE: AUTODESK REVIT
MARVEL TOWER JHELUM, PAKISTAN 2017 TYPE: MULTI-PURPOSE COMMERCIAL ROLE: COMPLETE ARCHITECTURAL DESIGN AND DETAILING. BUILDING SERVICES LAYOUT DESIGN. DAYLIGHT STUDIES. SOFTWARE: REVIT CONSULTANTS: SHEHER SAAZ PVT LTD
TYPICAL FLOOR PLAN
SECTION THROUGH STAIRS
MARVEL TOWER JHELUM, PAKISTAN 2017 TYPE: MULTI-PURPOSE COMMERCIAL ROLE: COMPLETE ARCHITECTURAL DESIGN AND DETAILING. BUILDING SERVICES LAYOUT DESIGN. DAYLIGHT STUDIES. SOFTWARE: REVIT CONSULTANTS: SHEHER SAAZ PVT LTD
CUT THROUGH PERSPECTIVE SECTION
HOUSE AT SECTOR G-10 ISLAMABAD, PAKISTAN 2017 TYPE: RESIDENTIAL ROLE: ARCHITECTURAL DESIGN AND DETAILING. BUILDING SERVICES DESIGN. SOFTWARE: REVIT CONSULTANTS: SHEHER SAAZ PVT LTD
SECTION PLAN
ZAM ZAM SOCIETY LAHORE, PAKISTAN TYPE: HOUSING SOCIETY (110 ACRES) ROLE: MASTERPLANNING, RESIDENTIAL LAYOUR AND DETAILED DESIGN CONSULTANTS: LANDMARK CONSULTANTS
APARTMENT TOWER LAYOUT
LAYOUT PLAN
APCO TOWER RAWALPINDI , PAKISTAN TYPE: OFFICES AND COMMERCIAL TOWER ROLE: ARCHITECTURAL DESIGN DETAILING DESIGN CONSULTANTS: LANDMARK CONSULTANTS
SECTION
PLANS
IT TOWER LAHORE , PAKISTAN TYPE: COMMERCIAL TOWER ROLE: ARCHITECTURAL DESIGN, BUILDING SERVICES INTEGRATION CONSULTANTS: LANDMARK CONSULTANTS
PLANS
AZAM CLOTH MARKET LAHORE , PAKISTAN TYPE: COMMERCIAL ROLE: ARCHITECTURAL DESIGN DETAIL DESIGN CONSULTANTS: LANDMARK CONSULTANTS
PLAN
SECTION
BROADWAY TOWER LAHORE , PAKISTAN TYPE: MIXED USE TOWER ROLE: ARCHITECTURAL DESIGN DETAIL DESIGN CONSULTANTS: LANDMARK CONSULTANTS
PLANS
TOWER 1
TOWER 3
TOWER 2
MASTERPLAN IN CONTEXT
SECTIONAL ELEVATION
MSC. ARCHITECTURAL ENGINEERING THESIS THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY TYPE: ACADEMIC Advisor: Prof. Massimo Tadi POLITECHNICO DI MILANO ITALY 2013 Design of a wellness center and basic health facilities for refurbishment and new addition to the historic silk factory building. Focus on creation of a sustainable-transformation scheme for the city (Valmadrera, Italy) based on the Therapeutic and Eco-tourism vision integrating passive/technological solutions like earth sheltering, renewable energy, green envelope, effective lighting and ventilation tools, starting from the urban planning, integrating with the confined architectural and technological detailing.
URBAN ANALYSIS
SURFACE MAPPING
THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY
GROUND FLOOR PLAN
THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY
SECTION
THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY
3-D VIEWS
THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY
SECTION
MEDITATION ROOM SKIN DETAIL
THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY
MEDITATION ROOM
RETROFITTING OF HISTORIC STRUCTURE
THE EARTH-SHELTERED BODY FACTORY, VALMADRERA, ITALY CONSERVATION OF FACADE AND PROPOSED INTERVENTION AFTER INVESTIGATION
SURFACE MAPPING
PROPOSED INTEVENTION BASED ON ICOMOS PRINCIPLES
NEW ADDITION TO THE DIOCESANO MUSEUM ,MILAN, ITALY ITALY TYPE: ACADEMIC COURSE: ARCHITECTURAL DESIGN STUDIO PROFESSOR MASSIMO TADI PROFESSOR FRANK NOLEDINI MSC. ARCHITECTURAL ENGINEERING UNIVERSITY: POLITECHNICO DI MILANO ITLAY
NEW ADDITION TO THE DIOCESANO MUSEUM , ITALY
NEW ADDITION TO THE DIOCESANO MUSEUM , ITALY
NEW ADDITION TO THE DIOCESANO MUSEUM , ITALY
ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY TYPE: ACADEMIC COURSE TITLE: TECHNOLOGICAL DESIGN MSC. ARCHITECTURAL ENGINEERING UNIVERSITY: POLITECHNICO DI MILANO ITLAY
ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY
ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY
ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY
ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY
ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY
ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY
Copper panel TECU
500 x 1200 mm
L curved profile Hilti
80 x 60 mm
C section purlin
50 x 80 mm
Braquet Hilti 60 x 60 mm Aluminium painted tube 100 x 75 mm
Steel Truss
11 8
12
+1250
Roof 2
10 9 7 6 5 4
3 2 1
12-Concrete Tile 15mm 11-Plastic support. Air gap 5mm 10-PVC Reinforced waterproof membrane. Index 4mm 9-Leveling Concrete layer 60mm thick 8-Polyster reinforced waterproof membrane. Index 4mm 7-OSB Board 12mm thick SipCasa 6-Expanded polystyrene foam 100mm thick SipCasa 5-OSB Board 12mm thick SipCasa 4-Air Gap 70mm thick - Flexible ceiling hangers by KNAUF 3-Rock wool by KNAUF 120mm thick 2-Vapor Barrier 1mm thick 1-Gypsum Plasterboard false ceiling by KNAUF12mm thick
1-Gypsum Plasterboard Screwed by KNAUF 12mm thick 2-Vapor Barrier by Isorain 1mm thick 3-Gypsum Plasterboard Screwed by KNAUF 12mm thick 4-Rock wool by KNAUF 25mm thick A-Galvanized steel profile by KNAUF 25mm thick 5-OSB Board 12mm thick SipCasa 6-Expanded polystyrene foam by SipCasa 150mm thick
Panel SIP by SipCasa
7-OSB Board 12mm thick SipCasa 8-Rock wool panel by KNAUF 120mm thick 9-Adhesive waterproof membrane. 1.5mm thick. By Nova 2 11 10 9
8
7
6
5 4 31 A
10-Air Gap 43mm thick. B: Profile L bolted to main steel structure. 40x40x2 by Hilti
C: Bracket bolted to concrete wall. 40x82x80 by Hilti
11-Fibrecement board Cladding by Cembrite 8mm thick
+800
1 2 3 4 5 6 7 8
9 10 11
1-Ceramic tiles size
300*300*8mm
2-Cement Mortar
12mm
3-Damtec Ceremic plus
3mm
4-Cement Mortar
12mm
5-Water Proof Membrane
2mm
6-GLULAM panels
25mm
7-Steel Girder 8-KNAUF Nonius Hanger
for CD 60*27
9-Rock wool by KNAUF
60mm
10-KNAUF ceiling Profiles
CD 60*27mm
11-Gypsum board by KNAUF
12mm thick
Blow-up Section A-A
ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY
2 8
7
6
5
4
3 1
1-Gypsum Plasterboard Screwed by KNAUF 12mm thick 2-Vapor Barrier by Isorain 1mm thick 3-Gypsum Plasterboard Screwed by KNAUF 12mm thick 4-Expanded polystyrene Block by ClimaBlock 60mm thick 5-Reinforced Concrete 150mm thick 6-Expanded polystyrene Block by ClimaBlock 120mm thick 7-Air Gap 43mm thick. A: Profile L bolted to main steel structure. 40x40x2 by Hilti
B: Bracket bolted to concrete wall. 40x82x80 by Hilti
8-Fibrecement board Cladding bolted to (8) by Cembrit 8mm thick
+100 1 2 3 4 5 6 7 8
9 10 11
12
Foam Glass
13 14 15
Metallic partition
- 150
1-Ceramic tiles 2-Cement Mortar 3-Damtec Ceremic plus 4-Cement Mortar
300*300*8mm 12mm 3mm 12mm
5-Gutex Thermal Floor 6-Extruded polystyrene sheet 7-Gutex Thermal Floor 8-PCC
20mm 20mm 20mm 100mm
9-Metal Decking
3mm
10-KNAUF Nonius Hanger
for CD 60*27
11-KNAUF Mineral wool
100mm
12-KNAUF Mineral wool 13-Rock wool by KNAUF 14-KNAUF ceiling Profiles
100mm 60mm CD 60*27mm
15-KNAUF Cement Plaster Board
12mm
- 250 1 2 3 4
5
6 7 8
1-PCC (1:2:4) 2-Sand fill 3-Water proof membrane with Primer 4-RCC (1:4:8) 5-Iglu' H27 by DALIFORM
200mm thick 500mm thick 4mm thick 500mm thick 500*500*270mm
6- Air Gap 7-PCC (1:4:8)
100mm
ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY
D
C
E
F 325
B
380
280
265
415
R2 - Roof Slab as per detail T-04
+12.50m
G 675
A
R2 - Roof as per detail T-04
PV Modules Louvers
60 60 70
R1- Green Roof as per detail T-08
140
Skylights +480
Adjoining Structure
30
+450
Expansion Joint
+495
65
190
50
WORKSPACE
F2 - Floor slab as per detail T-05
100
30 120
LOBBY
+800
130
+4.50m
5
140
220
W2 - Dry Wall as per detail T-02
320 350
660
F2 - Floor slab as per detail T-05
W3 - Curved wall as per detail T-03
140
30
310 340
220
WORKSPACE
LOBBY
+8.00m
F2 - Floor slab as per detail T-05
965
660
W2 - Dry Wall as per detail T-02
765
F2 - Floor slab as per detail T-05
80 60 60 60 50
Copper Panels
LOBBY
+1.00m
SKY COURT
220
RECEPTION AND WAITING
220
GUEST ROOM
320 350
F1 - Floor slab as per detail T-06 W1 - Dry Wall as per detail T-01
F1 - Floor slab as per detail T-06
51
50
+100
AIR INLET
W0 - RC retaining wall as per detail
PARKING
300 350
20
195
30
104
205
+/-0.00m
4M WIDE DRIVE WAY
-2.50m
B1 - Basement slab as per detail T-07
4M WIDE DRIVE WAY
-250
A
B
C
D
E
F
G
ENERGY-EFFICIENT OFFICE BUILDING IN LECCO , ITALY
A
B
D
C
E
F
G R2 - Roof Slab as per detail T-04
+12.50m
Louvers
R2 - Roof as per detail T-04
Copper Panels 340
Elevator Otis HomeLift OP800
330
220 150
40
215
+8.00m
W3 - Curved wall as per detail T-03 Copper Panels
+800
R1- Green Roof as per detail T-08
STAIRS +625
310 350
Skylights +480
+450
Adjoining Structure
20
20
+4.50m
Expansion Joint
STAIRS
350 310
+275
20
ENTRY
+/-0.00m
STAIRS
220
CORRIDOR
+100
330
-75
-2.50m
W0 - RC retaining wall as per detail
MACHINE ROOM
ELEVATOR
DRIVE WAY
-250
A
F1 - Floor slab as per detail T-06
150
+1.00m
SERVICE ROOM
B
C
D
E
F
G
B1 - Basement slab as per detail T-07
ENVIRONMENTAL SIMULATION ECOTECT ANALYSIS, 2014 TYPE: ACADEMIC
ROLE: STUDIO INSTRUCTOR COURSE: ENVIRONMENTAL SIMULATION FALL 2014 AUTODESK ECOTECT SCHOOL OF ART, DESIGN & ARCHITECTURE, NUST
VISUALISATION AND SIMULATION REVIT ARCHITECTURE, 2015 TYPE: ACADEMIC
ROLE: STUDIO INSTRUCTOR TRAINING: VISUALISATON & SIMULATION REVIT ARCHITECTURE SCHOOL OF ART, DESIGN & ARCHITECTURE, NUST