ARCHITECTURE PORTFOLIO | YASMINE FAHMY

Page 1

YA S M I N E FA H M Y ARCHITECTURE PORTFOLIO 2015-2019


ABOUT Contact Details

American University of Sharjah P.O BOX 26666 Sharjah, United Arab Emirates g00058460@aus.edu y_fahmy@outlook.com (+971) 501535054 (AE)

Languages

English Arabic

E D U C AT I O N 2014 - 2019

The American University of Sharjah - Bachelor of Architecture, NAAB Accredited Program 5 Year Professional Degree College of Architecture, Art and Design (CAAD) Graduation 2019

Fall 2017

Architectural Studio Abroad - Barcelona, Spain In collaboration with EMBT

Summer 2014 2000 - 2014

Architectural Summer course - Across Italy The International School of Choueifat Dubai, United Arab Emirates High School Diploma + International General Certificate of Secondary Education (IGCSE)

EXPERIENCE Summer 2018

Internship - CallisonRTKL Dubai, UAE Design Reports, Concept and Final Renders, Concept Diagrams, Construction Documents, Site Analysis, Urban Design Diagrams, Program Studies

Summer 2017

Internship - EMBT | Enrique Miralles & Benedetta Tagliabue Barcelona, Spain Worked on the Concept Design Stage of 3 Competitions (one of which is currently under construction) Built both 3D and Physical Models, Concept Renders, Collages, Drafting, Concept and Programming Diagrams

Summer 2016

Internship - Hegazy Engineering Consultants Dubai, United Arab Emirates Drafting, 3D Modeling, Preliminary Renders


ADDITIONAL EXPERIENCE

Fall 2016 - Ongoing

Exhibition Curator - Graduate Exhibition “Six Degrees” Vice President - American Institute of Architecture Students (AIAS) Media Committee - TAU SIGMA DELTA Architectural Honor Society Activities Coordinator - Fine Arts Club

Fall 2017 - Ongoing

Exhibition Curator - American Institute of Architecture Students (AIAS)

Spring 2019 Fall 2018 Spring 2018

Fall 2016 - Spring 2018 Spring 2015

Media Coordinator - American Institute of Architecture Students (AIAS) Exhibition Volunteer - SIKKA International Sketch-Fest

AWA R D S & AC H I E V E M E N T S Fall 2018 Spring 2018 Spring 2018, Fall 2018

TOTAL Professeurs Associes and TOTAL E&P UAE: Course in Environment and Sustainability Exhibited + Curated - Barcelona: Place, Culture, and Architecture Published - in the arc_caadaus student work booklet

Spring 2018

Short Listed - in the RSP (Raglan Squire & Partners) Drawing Award 2017-2018

Spring 2017

Exhibited - at the American Institute of Architecture Students (AIAS) ‘1-5 Drawings’ Exhibition

Spring 2016

Published - StudyArchitecture.com - “Greg Spaw on Digital Fabrication at AUS”

Fall 2014 Fall 2014, Fall 2015, Fall 2016 Spring 2017 - Ongoing Fall 2017 Fall 2014 - Ongoing

Exhibited - at the ‘1971’ Design Space Competition Dean’s List ( CGPA +3.5) Tau Sigma Delta - Architectural Honor Society Chancellor’s List (Maintaining Dean’s List for 2 Semesters) Merit Scholarship (Maintaining a Minimum of CGPA 3.0)

SKILLS Digital

Physical

AutoCAD Adobe Suite (Illustrator, Photoshop, Indesign, Premiere) Rhino 5.0 V-Ray Keyshot ReMake Sketchup Intermediate: Grasshopper, Autodesk Maya, Enscape Physical Modeling Drawing Woodshop 3D printing Universal Laser Cutter Vacuum Forming


ARCHITECTURE

01 02

DAR AL MUSIQA SPRING 2018

Comprehensive Design Studio

POBLENOU DESIGN HUB FALL 2017

Urban Design Project

03

PROTO-ARCHITECTURE

04

BATHING RITUAL

05

THE RETREAT

06

SPRING 2017

Experimental Design Studio

SPRING 2016

Residential Design Project

FALL 2015

Residential Design Project

AFFORDABLE HOUSING

SPRING 2019 (WORK-IN-PROGRESS) Residential Design Project


DESIGN + OTHER

01 02

DESIGN BUILD FALL 2018

CAAD WORK POD

STRUCTURES SPRING 2017

Design / Build Project

03

DIGITAL FABRICATION

04

INTERNSHIP

05

SELECTED COLLAGES

SPRING 2016

Design / Build Project

SUMMER 2017

Building Rehabilitation at EMBT

FALL 2017

Alternative Diagrams



ARCHITECTURE


01 DAR AL MUSIQA LOCATION

AL KHAWANEEJ | DUBAI UAE

PROJECT TYPE

MUSIC SCHOOL

PROJECT SIZE

2500 m2

STUDIO

ARC 402

YEAR

SPRING 2018

PROFESSOR

IGOR PERAZA

PROJECT TEAM

IBRAHIM ABDELLATIF

PROGRAMS USED

MODELING RHINO 5 AUTOCAD CHAOS GROUP VRAY PHOTOSHOP ILLUSTRATOR INDESIGN

DESCRIPTION The intent of this project is to design a music school in an underdeveloped area while neighboring a high-school designed by RCR architects. The concept revolves around the importance of gathering circles in the local community and the bridging between those gathering circles. This is done while taking sustainability and the harsh environment at play.


9



11



13



15


1

3

2

5

4

6

B A1.1

D A1.1

C A1.1

E 10600

3000

8700

3000

5450

5450

3000

9950

6400

7100

7000

6900

3700

10100

10100

OFFICES 60 s.q.m

BIG LESSON ROOM 80 s.q.m

D-13

900

1700

D-14

900

BIG LESSON ROOM 80 s.q.m

900

W-06

W-09

10300

W-10

W-15

W-14

C A1.1

W-12

1800

W-11

D-09

W-13

D-16

D-19

2700

4500

1900

W-01

3000

3000

3000

2700

D-15

7

3200

W-26

5

D-21

1950

D-27

900

D-20

D-28

1200

B A1.1

6

D-33

8200

8

3000

2625

4 RECEPTION / TB 22 .s.q.m.

W-27

D-34

900

3

LOBBY 150 s.q.m.

WC 32 s.q.m.

+ 0.20 M

2625

D-01

30550

2

B A1.1

2625

34150

3800

5500

A A1.1

STORAGE 125 s.q.m

6

1

3400

12400

W-05

3200

2700

6400 D-10

D-08

2500

6780

10200 900

1700

3500

D-03

D-02

6780

3000

14800

W-04

W-08

9900

C

D-04

47650

4550

5

W-03

W-02

6070

D-12

D-17

3750

MULTPURPOSE 130 s.q.m.

A A1.1

3000

4

900

8400

1700

MEP 16 s.q.m

2960

900 W-07

2000

D-05

10700

7400

A A1.1

WC 32 s.q.m.

9900

1700

D-11

1900

D-18

2960

900

3500

4900

D-07

3

D

3600

D-06

3600

900

3000

1300

900

2

1300

5600

1

3500

3000

I

H

G

F

E

B

1600

C

W-25

W-17

4600

CAFE 20 s.q.m.

D-22

D-30

A

D-23

+ 0.00 M

7000

J

D-29

900

K

STAGE

1300

L

16500

M

+ 0.20 M

RECITAL HALL D 525 s.q.m

900

N

B 8400

E

W-16

19350

D-35

3000

19650

9

D-24

W-18

W-19

W-21

W-20

1550

1550 D-25

TOP OF PARAPET ELEV. 13.7M

D-26 D-31

W-23

11

W-22

1300

3000

W-24

2625

3000

10

3600

D-32

4350

TOP OF CANOPY ELEV. 11.3M

12

D

+ 0.20 M PAV LVL

A

MEDIUM LESSON ROOM 60 s.q.m.

OFFICES 60 s.q.m. MULTIPURPOSE ROOM 130 s.q.m.

D

E

OFFICES 60 s.q.m.

F

D A1.1

BIG LESSON ROOM 90 s.q.m.

C

C A1.1

BIG LESSON ROOM 90 s.q.m. B

A STORAGE 150 s.q.m.

G

H

I

J

FIRST FLOOR ELEV. 4.2M

K

M

L

D A1.1

aɪ-waɪ

aɪ-waɪ

STUDIOS C1 SECTION A-A A 251

3700

6900

6900

APPROVAL STAMP:

STUDIOS

6900

6900

9727

NOTES:

IBRAHIM ABDELLATIF - 54085 b00054085@aus.edu - 0509255151

WOOD DECKING

ROUGH CONCRETE TILES

YASMINE FAHMY 58460 g00058460@aus.edu - 0501535054

WEBSITE: ai-wai-studio.com DUBAI, UNTIED ARAB EMIRATES

SAND

D-00

FIRE RATED WOOD DOOR

W-00

GLASS WINDOW

CERAMIC TILES

+ 0.00 M STR LVL

3000

5450

5450

3000

PROJECT:

COPYRIGHT:

KEY PLAN:

8700

3000

TOP OF GRADE ELEV. 0.0M

10600

REVISIONS:

REV.NO

BUILDING: DAR AL-MUSIQA LOCTION: AL KHAWANEEJ DUBAI UNTIED ARAB EMIRATS CLIENT: PROF. IGOR PERAZA CURIEL

This drawing is the property of a�-wa� studios. You hereby agree and undertake that you will not under any circumstances, utilize, copy, reproduce or take advantage of the drawings (or any part of them) prior to our written consent, should any contravention occurs, the onus shall be on you to prove that you have not be in breach. All rights reserved.

N

DRAWING DETAILS

DATE

01

PHASE STATUS

PROJECT NO.

A3

DRAWN BY

02

CHECKED BY

03

APPROVED BY

SHEET TITLE

aɪ-waɪ

STUDIOS

SHEET #

GROUND FLOOR PLAN

A 102 SCALE : 1:200

C

A

B

C

D

E

F

G

H

I

J

K

L

M

N

TOP OF PARAPET ELEV. 13.7M

TOP OF CANOPY ELEV. 11.3M

B

SECOND FLOOR ELEV. 8.9M MEDIUM LESSON ROOM 70 s.q.m.

RECITAL HALL 500 s.q.m. FIRST FLOOR ELEV. 4.2M

CAFE 20 s.q.m. TOP OF GRADE ELEV. 0.0M

10600 A A1 SECTION B-B A 251

3000

8700

3000

5450

5450

3000

9727

6900

6900

6900

6900

3700


1

2

4

3

5

6

B A1.1

D A1.1

C A1.1

E 3000

8700

3000

5450

5450

3000

9950

6400

7100

7000

6900

3700

3000

10600

W-21

D-22

D-23

1000

1

W-20

1000

SMALL LESSON ROOM 35 s.q.m

SMALL LESSON ROOM 35 s.q.m

W-16

2960

3000

+ 0.20 M

+ 0.20 M

3000

A A1.1

OFFICES 60 s.q.m

BIG LESSON ROOM 80 s.q.m

1700

W-06

24300

W-08

W-09

W-11

W-25

7400

STORAGE 50 s.q.m

W-02

10400

C A1.1

6400

4700

3000

7500

3200

W-14

D-02

2000

4550

BIG LESSON ROOM 80 s.q.m

D-04

D-03

D-25

+ 4.20 M

W-12

D-12

W-01

W-12

D-13

1900

D-21

D-19

W-50

W-52

W-51

1000

2650 13800

+ 0.20 M 3000 W-32

8600

W-33

D-14

W-49

2000

W-29

D-15

W-34

W-48

3000

3000

B A1.1

D-20

WC 32 s.q.m.

5250

8

3200

33850

LIBRARY 132 .s.q.m

8300

W-30

5250

3000 5400

5300

SMALL LESSON ROOM 35 s.q.m

5300

SMALL LESSON ROOM 35 s.q.m

3000

B A1.1

4500

3000

2000

D-01

W-31

900

W-27

900

D-26

1000

9900

D-27

1000

40750

W-28

7

56600

3000

3000

W-13

3000

6

3000 W-35

W-47

17300

2700

+ 0.20 M

B

D-16

D-17

8300

8200

8400

4600

900

RECITAL HALL 525 s.q.m

+ 4.20 M D-28

1300

W-46

W-45

MEDIUM LESSON ROOM 70 s.q.m

19650

9

19300

5500

10400

3600

1000

23950

W-04

D-09

2000

14800

10600 W-03

+ 0.20 M

6780

10200 900 900

2500 2500

D-05

3500

MULTPURPOSE 130 s.q.m.

W-08

10100

D-11

W-10

29500

3000

MEDIUM LESSON ROOM 75 s.q.m A A1.1

C

6070

2000

D-06

D-24

W-26

4

+ 0.20 M

6780

900 W-07

W-15

8400

5

D-10

1700

6400

3000

7300

10400

7500

7400

3000

A A1.1

WC 32 s.q.m.

9900

1700

W-18

2960

900

3500 W-24

10000

MEDIUM LESSON ROOM 75 s.q.m

10100

D-08

3600

W-17

W-23

3

D

3600

900

D-07

3000

3000

3000

42700

1300

2

3000 W-19

5250

900

5250

5450

3000

5450

5600

W-22

7000

8500 W-44

W-36

1550

1550

13800 W-42

W-41

3000

3000

3000

W-43

29000 W-37

11

D-29

D-30

1000

1000

W-38

D-18

1300

10

3600

5250

4150

SMALL LESSON ROOM 20 s.q.m

5250

4150

4350

W-40

SMALL LESSON ROOM 20 s.q.m 3000

W-39

3000

12

A

C

D

E

F

D A1.1

B

C A1.1

A

3000

+ 0.20 M PAV LVL

G

H

I

J

K

L

M

D A1.1

aɪ-waɪ

aɪ-waɪ

STUDIOS

APPROVAL STAMP:

STUDIOS

b00054085@aus.edu - 0509255151

COPYRIGHT: ROUGH CONCRETE TILES

YASMINE FAHMY 58460

WOOD DECKING

g00058460@aus.edu - 0501535054

N

D-00

W-00

WEBSITE: ai-wai-studio.com 1 DUBAI, UNTIED ARAB EMIRATES

E

NOTES:

IBRAHIM ABDELLATIF - 54085

2

M

SAND

L

FIRE RATED WOOD DOOR

GLASS WINDOW

CERAMIC TILES

K

This drawing is the property of a�-wa� studios. You hereby agree and undertake that you will not under any circumstances, utilize, copy, reproduce or take advantage of the drawings (or any part of them) prior to our written consent, should any contravention occurs, the onus shall be on you to prove that you have not be in breach. All rights reserved.

3

J

I

PROJECT:

KEY PLAN:

G

F

REVISIONS:

REV.NO

BUILDING: DAR AL-MUSIQA LOCTION: AL KHAWANEEJ DUBAI UNTIED ARAB EMIRATS CLIENT: PROF. IGOR PERAZA CURIEL 4

H

N

+ 0.00 M STR LVL

DATE

01

E

DRAWING DETAILS

PHASE STATUS

PROJECT NO.

A3

DRAWN BY

02

CHECKED BY

03

5 APPROVED BY

D

C

SHEET TITLE

aɪ-waɪ

B

STUDIOS

SHEET #

FIRST FLOOR PLAN

A 103 SCALE : 1:200

6

A

TOP OF PARAPET ELEV. 13.7M

TOP OF CANOPY ELEV. 11.3M

MEDIUM LESSON ROOM 60 s.q.m.

OFFICES 60 s.q.m.

D

MULTIPURPOSE ROOM 130 s.q.m. BIG LESSON ROOM 90 s.q.m.

BIG LESSON ROOM 90 s.q.m.

STORAGE 150 s.q.m.

FIRST FLOOR ELEV. 4.2M

OFFICES 60 s.q.m.

TOP OF GRADE ELEV. 0.0M

3700

6900

6900

6900

6900

9727

3000

5450

5450

3000

8700

3000

10600

C1 SECTION A-A A 251

C

17


1

2

3

4

5

6

E

5600

1

300 MM LOAD BEARING WALL

I-BEAM SYSTEM

3000

2

3

7400

D

OPEN TO BELOW

LIFT

3000

4

4550

5

C

SECONDRY STRUCTURE

OPEN TO BELOW

OPEN TO BELOW

3000

6

LIFT

5500

7

300 MM LOAD BEARING WALL OPEN TO BELOW

3000

8

TRUSS SYSTEM

9

8400

B

OPEN TO BELOW

3000

10

4350

11

12

A 10600

3000

A

aɪ-waɪ

aɪ-waɪ

STUDIOS

STUDIOS

APPROVAL STAMP:

B

8700

3000

C

D

5450

NOTES:

F

YASMINE FAHMY 58460 g00058460@aus.edu - 0501535054

WEBSITE: ai-wai-studio.com DUBAI, UNTIED ARAB EMIRATES

2

9950

6400

H

I

PROJECT:

This drawing is the property of a�-wa� studios. You hereby agree and undertake that you will not under any circumstances, utilize, copy, reproduce or take advantage of the drawings (or any part of them) prior to our written consent, should any contravention occurs, the onus shall be on you to prove that you have not be in breach. All rights reserved.

b00054085@aus.edu - 0509255151

3000 G

COPYRIGHT:

IBRAHIM ABDELLATIF - 54085

1

5450

E

KEY PLAN:

7000 K

6900 L

REVISIONS:

REV.NO

BUILDING: DAR AL-MUSIQA LOCTION: AL KHAWANEEJ DUBAI UNTIED ARAB EMIRATS CLIENT: PROF. IGOR PERAZA CURIEL

3

7100 J

3700 M

N

DRAWING DETAILS

DATE

01

PHASE STATUS

PROJECT NO.

A3

DRAWN BY

02

CHECKED BY

03

APPROVED BY

4

5

SHEET TITLE

aɪ-waɪ

STUDIOS

S 103 SCALE : 1:200

6

E 1

2

3

4

5

6

7

8

9

10

12

11

TOP OF CANOPY ELEV. 11.3M

MEDIUM LESSON ROOM 70 s.q.m.

FIRST FLOOR ELEV. 4.2M

D

MULTIPURPOSE ROOM 130 s.q.m.

TOP OF GRADE ELEV. 0.0M

5600

SECTION C-C C1 A 251

C

3000

7400

3000

4550

3000

5500

3000

8400

3000

4350

SHEET #

FRAMMING FIRST FLOOR


1

2

4

3

5

6

B A1.1

D A1.1

C A1.1

E 10600

3000

8700

3000

5450

5450

3000

9950

6400

7100

7000

6900

3700

5600

1

3000

2

MEP 16 s.q.m

3

D

7400

WC 32 s.q.m.

A A1.1

A A1.1 BIG LESSON ROOM 80 s.q.m

OFFICES 60 s.q.m

C A1.1

MULTPURPOSE 130 s.q.m.

4550

5

STORAGE 125 s.q.m

A A1.1

3000

4

BIG LESSON ROOM 80 s.q.m

C

3000

6

LOBBY 150 s.q.m.

B A1.1

B A1.1

8

2

3000

1

3

4

WC 32 s.q.m.

RECEPTION / TB 22 .s.q.m.

5500

7

5

6

9

B 8400

RECITAL HALL 525 s.q.m

CAFE 20 s.q.m.

E 1

2

3

4

5

6

7

8

9

10

12

11

3000

10

11

4350

TOP OF CANOPY ELEV. 11.3M

12 MEDIUM LESSON ROOM 70 s.q.m.

A

C

D

E

F

D A1.1

B

C A1.1

A

D

MULTIPURPOSE ROOM 130 s.q.m.

G

H

I

J

K

L

M

N

D A1.1

aɪ-waɪ

aɪ-waɪ

STUDIOS

SECTION C-C C1 A 251

STUDIOS

APPROVAL STAMP:

5600

NOTES:

3000

7400

IBRAHIM ABDELLATIF - 54085 b00054085@aus.edu - 0509255151

YASMINE FAHMY 58460

GYPSUM BOARD FINISH

ALUMINIUM BAFFLE CEILING

g00058460@aus.edu - 0501535054

WEBSITE: ai-wai-studio.com DUBAI, UNTIED ARAB EMIRATES

WOODEN BAFFLE CEILING

PERFORATED WOODEN ACOUSTICAL PANELS

3000 COPYRIGHT:

4550

This drawing is the property of a�-wa� studios. You hereby agree and undertake that you will not under any circumstances, utilize, copy, reproduce or take advantage of the drawings (or any part of them) prior to our written consent, should any contravention occurs, the onus shall be on you to prove that you have not be in breach. All rights reserved.

FIRST FLOOR ELEV. 4.2M

TOP OF GRADE ELEV. 0.0M

3000 PROJECT:

8400 KEY PLAN:

3000

5500

3000 REVISIONS:

REV.NO

BUILDING: DAR AL-MUSIQA LOCTION: AL KHAWANEEJ DUBAI UNTIED ARAB EMIRATS CLIENT: PROF. IGOR PERAZA CURIEL

4350

DATE

01

DRAWING DETAILS

PHASE STATUS

PROJECT NO.

A3

DRAWN BY

02

CHECKED BY

03

APPROVED BY

SHEET TITLE

aɪ-waɪ

STUDIOS

SHEET #

GROUND FLOOR RCP

A 501 SCALE : 1:200

C

1

2

3

4

5

6

7

8

9

10

12

11

TOP OF CANOPY ELEV. 11.3M

B

SMALL LESSON ROOM 20 s.q.m

LIBRARY 132 .s.q.m

SMALL LESSON ROOM 20 s.q.m

FIRST FLOOR ELEV. 4.25M CAFE 20 s.q.m.

TOP OF GRADE ELEV. 0.0M

5600

3000

7400

3000

4550

3000

5500

3000

8400

3000

4350

A SECTION D-D A1 A 251

19


1

2

3

5

4

6

41200 16800

7600

16800

E

STAINLESS STEEL RAILING STEEL HANGERS DARK WOOD FINISH 12800

METAL PANEL METAL BOLT STEEL STRINGER BEAM BALUSTRADE SUPPORT STEEL PLATE FULL PENETRATION BUFF WELD A5 STAIRS TO FLOOR DETAIL A 401 1:40

D D1 STAIRS PLAN A 401 1:40

32000 2150

32000

C

17200 900

2150

2150

17200

B

A

A1 STAIRS SECTION A 401 1:40

aɪ-waɪ

aɪ-waɪ

STUDIOS

A5 STAIRS ELEVATION A 401 1:40

APPROVAL STAMP:

STUDIOS

1 IBRAHIM ABDELLATIF - 54085

NOTES:

PROJECT:

COPYRIGHT:

2

b00054085@aus.edu - 0509255151

3

YASMINE FAHMY 58460 g00058460@aus.edu - 0501535054

WEBSITE: ai-wai-studio.com DUBAI, UNTIED ARAB EMIRATES

This drawing is the property of a�-wa� studios. You hereby agree and undertake that you will not under any circumstances, utilize, copy, reproduce or take advantage of the drawings (or any part of them) prior to our written consent, should any contravention occurs, the onus shall be on you to prove that you have not be in breach. All rights reserved.

KEY PLAN:

BUILDING: DAR AL-MUSIQA 4 LOCTION: AL KHAWANEEJ DUBAI UNTIED ARAB EMIRATS CLIENT: PROF. IGOR PERAZA CURIEL

REVISIONS:

REV.NO

DRAWING DETAILS

DATE

01

PHASE STATUS 5

PROJECT NO.

A3

DRAWN BY

02

CHECKED BY

03

APPROVED BY

SHEET TITLE

aɪ-waɪ

STUDIOS

SHEET #

6 STAIRS DETAILS

A 304 N/S

E N

M

L

K

J

I

H

G

F

E

D

C

B

A

TOP OF PARAPET ELEV. 13.7M

TOP OF CANOPY ELEV. 11.3M

D FIRST FLOOR ELEV. 4.2M

TOP OF GRADE ELEV. 0.0M

A1 ELEVATION B A 201

C


1

2

3

4

5

6

E

4000

6500

FEMALE TOILET

250

4250

4250

250

4000

250

250

GYPSUM WALL

GYPSUM WALL

DROPPED CEILING

DROPPED CEILING

CERAMIC TILES

CERAMIC TILES

WOODEN DOOR

FLUSH SENSOR

WOODEN DOOR

DOOR HANDLE

10500

990

20000

20000

9750

10500

20000

1000

6500

4250

TOILET PAPER 1000

D

6500

4250

9750

750

WALL MOUNTED TOILET

750

9750

4250

C3 A 402.1

INTERIOR ELEVATION

C5 A 402.2

1:60

INTERIOR ELEVATION 1:60

6500

C

990

9750

2

3

6500

4000

4250

1

2300

1500

4 19999

1600

5

500

6

4000

250

250

1

9750 4

E

A 402

2

CONCRETE WALL

GYPSUM WALL

DROPPED CEILING

DROPPED CEILING

M

L

MALE TOILET

K

J

I

H

G

F

E

D

C

B

A

CERAMIC TILES

CERAMIC TILES 20000

9750 17999

20000

N

B

4250

6500

4250

3

WOODEN DOOR

WOODEN DOOR MIRROR TOP OF PARAPET TISSUE DISPENSER ELEV. 13.7M

10000 9000

10500

SOAP DISPENSER SENSOR FAUCET COUNTER TOP

D

TOP OF CANOPY ELEV. 11.3M

FULL BODY MIRROR

330

950

600

3750

ADA TOILET

DOOR HANDLE

4500

350

1500

1800

GLASS MIRROR 2749

FIRST FLOOR ELEV. 4.2M

A

A1 TOILET PLAN A 402 1:60

A3 A 402.1

INTERIOR ELEVATION

A5 A 402.2

1:60

INTERIOR ELEVATION 1:60

TOP OF GRADE ELEV. 0.0M

A1 ELEVATION B A 201

aɪ-waɪ

aɪ-waɪ

C

STUDIOS

APPROVAL STAMP:

STUDIOS

NOTES:

This drawing is the property of a�-wa� studios. You hereby agree and undertake that you will not under any circumstances, utilize, copy, reproduce or take advantage of the drawings (or any part of them) prior to our written consent, should any contravention occurs, the onus shall be on you to prove that you have not be in breach. All rights reserved.

b00054085@aus.edu - 0509255151

YASMINE FAHMY 58460 g00058460@aus.edu - 0501535054

WEBSITE: ai-wai-studio.com DUBAI, UNTIED ARAB EMIRATES

A

PROJECT:

COPYRIGHT:

IBRAHIM ABDELLATIF - 54085

B

C

D

E

F

G

KEY PLAN:

H

I

REVISIONS:

REV.NO

BUILDING: DAR AL-MUSIQA LOCTION: AL KHAWANEEJ DUBAI UNTIED ARAB EMIRATS CLIENT: PROF. IGOR PERAZA CURIEL

DATE

01

DRAWING DETAILS

PHASE STATUS

PROJECT NO.

A3

DRAWN BY

02

CHECKED BY

03

APPROVED BY

J

K

L

SHEET TITLE

aɪ-waɪ

M

STUDIOS

SHEET #

TOILET DETAILS

A 305 N/S

N

TOP OF PARAPET ELEV. 13.7M

B

TOP OF CANOPY ELEV. 11.3M SECOND FLOOR ELEV. 8.9M

FIRST FLOOR ELEV. 4.2M

TOP OF GRADE ELEV. 0.0M

A

A1 ELEVATION D A 201

aɪ-waɪ

aɪ-waɪ

STUDIOS

STUDIOS

IBRAHIM ABDELLATIF - 54085 b00054085@aus.edu - 0509255151

YASMINE FAHMY 58460

APPROVAL STAMP:

NOTES:

COPYRIGHT: This drawing is the property of a�-wa� studios. You hereby agree and undertake that you will not under any circumstances, utilize, copy, reproduce or take advantage of the drawings (or any part of them) prior to

PROJECT:

BUILDING: DAR AL-MUSIQA LOCTION: AL KHAWANEEJ

KEY PLAN:

REVISIONS:

REV.NO 01

DATE

DRAWING DETAILS

PHASE STATUS

PROJECT NO.

A3

DRAWN BY

SHEET TITLE

aɪ-waɪ

STUDIOS

ELEVATIONS

SHEET #

21



03

STEEL TUBE DATE

REVISIONS: REV.NO 01 02

A3

DRAINAGE PIPE PROJECT NO. DRAWN BY

CHECKED BY

METAL REBAR

aɪ-waɪ

DRAWING DETAILS

CONCRETE RAFT SLAB APPROVED BY

CONCRETE FOOTING

GRAVEL STUDIOS

EARTH

6

SCALE : 1:30

WALL SECTION

SHEET TITLE

23

A

SHE

A6 WALL SECTION A 302 1:30

COMPRESSED SAND / TAR TOP OF SLAB ELEV.0M

5

PHASE STATUS

CONCRETE TILES

1650

4000

12700 DOUBLE GLAZED GLASS PANELS

4

RECESSED LIGHTING FIXTURE

KEY PLAN:

ALUMINIUM BAFFLE CEILING

750 TERRACOTTA PANELS

STEEL BRACKET BUILDING: DAR AL-MUSIQA LOCTION: AL KHAWANEEJ DUBAI UNTIED ARAB EMIRATS CLIENT: PROF. IGOR PERAZA CURIEL

250

STEEL I-BEAM

PROJECT:

LAYER OF CONCRETE

485

1750 WOODEN BAFFLE CEILING

3

COPYRIGHT:

ALUMINIUM STEEL MULLION

HOLLOW CORE CONCRETE PANELS This drawing is the property of aɪ-waɪ studios. You hereby agree and undertake that you will not under any circumstances, utilize, copy, reproduce or take advantage of the drawings (or any part of them) prior to our written consent, should any contravention occurs, the onus shall be on you to prove that you have not be in breach. All rights reserved.

3000

485

250

575

2

BATT INSULATION

3800

1

STEEL TUBE

WATERPROOF MEMBRANE

METAL FLASHING

APPROVAL STAMP: NOTES:

RIGID INSULATION TOP OF SLAB ELEV.8.3M

E

STUDIOS

b00054085@aus.edu - 0509255151

YASMINE FAHMY 58460

g00058460@aus.edu - 0501535054

WEBSITE: ai-wai-studio.com DUBAI, UNTIED ARAB EMIRATES

TOP OF SLAB ELEV.8.7M

D

aɪ-waɪ

STRUCTURAL STEEL BEAM

IBRAHIM ABDELLATIF - 54085

STEEL I-BEAM

C

B

A

aɪ-waɪ

STUDIOS

TERRACOTTA LOUVERS

WOODEN BAFFLE WALL


02 POBLENOU DESIGN HUB LOCATION

22@ BARCELONA | SPAIN

PROJECT TYPE

DESIGN HUB

PROJECT SIZE

27,000 m2

STUDIO

ARC 401

YEAR

FALL 2017

PROFESSOR

CAMILO CERRO | IGOR PERAZA

PROJECT TEAM

ABDUKARIM UMAROV

PROGRAMS USED

RHINO 5, CHAOS GROUP VRAY, PHOTOSHOP, ILLUSTRATOR, INDESIGN

DESCRIPTION The project was located in the district of 22@ of the Sant Marti District in Barcelona, Spain. The site consisted of two adjacent Barcelona blocks and contained an existing textile factory and social housing units. In addition to, the social, economic and urban factors of the site, this design took into consideration all functions related to a design complex, in order to attract students and designers and activate this pedestrian block.


25



27


ARC 401 | DESIGN HUB | ABDUKARIM UMAROV 57410 | YASMINE FAHMY 58460


ARC 401 | DESIGN HUB | ABDUKARIM UMAROV 57410 | YASMINE FAHMY 58460

29


14.2 M

5.2 M 9.7 M CERAMICS LAB | STUDIO

RESTAURANT | STUDIO | BOOKSTORE

9.7 M

9.7 M TEXTILE LAB | STUDIO

05

RECEPTION

9.7 M CLAY LAB | STUDIO

WOODSHOP | STUDIO

MODULES ARC 401 | DESIGN HUB | ABDUKARIM UMAROV 57410 | YASMINE FAHMY 58460


LIGHT FIXTURES

LANDSCAPE MAZE

11

BENCHES AND LINEAR GRASS ELEMENTS

F L O O R F O U N TA I N S

LANDSCAPE

ARC 401 | DESIGN HUB | ABDUKARIM UMAROV 57410 | YASMINE FAHMY 58

31


Y LIBRAR LIBRARY

AURANT STNT RERA RESTAU LOBBY Y KIOSK LOBB KIOSK

AURANT STNT RERA RESTAU N CENPTIO REIO CEPT

RE

KIOSKKIOSK

S ICS CEICRAM CERAM

CAFE CAFE HOP HOP WOODS WOODS

CLAY CLAY KIOSKKIOSK CAFE CAFE

Y BBY LO INGUS ING LOBB HOUSHO

E STORE BOOKBO OKSTOR

TEXTILE TEXTILE

STUDIO UDIO ST

06

06

GROUND FLOOR GROUND FLOOR

0 5 50 100 GROUND 0 5 HUB | ABDUKARIM UMAROV 50 ARC 401 | DESIGN 57410 | YASMINE FAHMY 58460 100 GROUND ARC 401 | DESIGN HUB | ABDUKARIM UMAROV 57410 | YASMINE FAHMY 58460

0 5

10

30

50


LIBRARY RANT RESTAU LOBBY

KIOSK

ACE EVENT SP

RANT

RESTAU ION

RECEPT

S

STUDIO

ICS

CERAM

KIOSK

CLAY

KIOSK

Y

G LOBB

S

STUDIO

CAFE

HOP

WOODS

S

STUDIO

STORE

BOOK

TEXTILE

CAFE

HOUSIN

OP

WOODSH

S

STUDIO

STUDIO

Y GALLER

06

07

GROUND FLOOR FIRST FLOOR

0 5 50 100 GROUND 0 5 HUB | ABDUKARIM UMAROV 50 ARC 401 | DESIGN 57410 | YASMINE FAHMY 58460

100

ARC 401 | DESIGN HUB | ABDUKARIM UMAROV 57410 | YASMINE FAHMY 58460

0 5

10

30

50

33


03 PROTO-ARCHITECTURE LOCATION

AL MAJAZ | SHARJAH UAE

PROJECT TYPE

GALLERY

STUDIO

ARC 302

YEAR

SPRING 2017

PROFESSOR

GEORGE KATODRYTIS

PROGRAMS USED MODELING RHINO 5 MAYA CHAOS GROUP VRAY KEYSHOT PHOTOSHOP ILLUSTRATOR INDESIGN GRASSHOPPER

DESCRIPTION The intent of th is project was to study a specific structural system through primarily physical modeling and then transforming and mimicking the forces and behaviors created through parametric and digital processes. The main function of the construct is to provide spatial conditions and qualities that can accommodate gallery spaces within the local park, while integrating both the form and the function with the landscape and existing conditions such as the existing grid of palm trees.


35



37


04 BATHING RITUAL LOCATION

NONE

PROJECT TYPE

EXPERIMENTAL

PROJECT SIZE

300 m2

STUDIO

ARC 202

YEAR

SPRING 2016

PROFESSOR

MATTHEW TRIMBLE

PROGRAMS USED MODELING RHINO 5 CHAOS GROUP VRAY PHOTOSHOP ILLUSTRATOR INDESIGN

DESCRIPTION The intent of the is project was to generate a construct that accommodates and celebrates inhabitation, and in doing so provides a space for a ritual, in this case bathing. The design process took the experiential atmosphere into consideration; such as sun, wind and public and private conditions. Furthermore, the representations, drawings and renders, captured and communicated the sensory experience of inhabitation.


MI-DRY | WET

RFORATIONS REMAIN AT SHOLDER HEIGHT

FORATIONS ALLOW NON-OBSTUCTED VIEWS FROM THE INSIDE

EXPLODED AXON

INHABITATION | YASMINE FAHMY | 58460 | P: MT

39


BLOCKED LINES OF SIGHT

ZONES: DRY | SEMI-DRY | WET

WIND DIRECTION

WATER DEPTH

E

S

N

WALL SYSTEMS OUTER WALL PERFORATIONS REMAIN AT SHOLDER HEIGHT SUN PATH

INNER WALL PERFORATIONS ALLOW NON-OBSTUCTED VIEWS FROM THE INSIDE W


41


05 THE RETREAT LOCATION

CYPRUS

PROJECT TYPE

RESIDENTIAL

PROJECT SIZE

300 m2

STUDIO

ARC 201

YEAR

FALL 2015

PROFESSOR

FAYSAL TABBARAH

PROGRAMS USED MODELING RHINO 5 AUTOCAD CHAOS GROUP VRAY PHOTOSHOP ILLUSTRATOR INDESIGN

DESCRIPTION The intent of this project was to create a private retreat located in Cyprus for a university professor. The client is seeking a quiet retreat from the busy city life, in favor of a direct relationship with her natural surroundings in terms of weather, vegetation and views. During much of the year the climate of this region allows one to blur the boundary between the interior and the exterior, allowing one to treat the exterior as a simple extension of indoor living.


43


D

D A

B

C

C

A

+12.6m SECOND LEVEL

B

D

D

C

C

A

B

A

B

A

B

+12.6m SECOND LEVEL

D

D

C

C

A D

B D


SECTION A-A

SECTION A-A

45


06* ABUSHAGHARA MASTER-PLAN EXERCISE LOCATION

SHARJAH

PROJECT TYPE

RESIDENTIAL

PROJECT SIZE

350,000 m2

STUDIO

ARC 502

YEAR

SPRING 2019

PROFESSOR

CRISTIANO LUCHETTI

PROJECT TEAM

ABANOB ATAIA MARINA NASSIF YASMIN REHIM

PROGRAMS USED

MODELING RHINO 5 AUTOCAD CHAOS GROUP VRAY PHOTOSHOP ILLUSTRATOR INDESIGN

DESCRIPTION In this exercise, we were required to design a new master plan of the underdeveloped Abu Shagharah residential area; that was transformed from a secondhand car market to an inactive zone. Through the master plan, we proposed a solution for the existing urban condition. The primary added components consist of: - Primary public spaces (parks) - Secondary green spaces - Tertiary pedestrian passages - Way-finding nodes - Mixture of housing typologies


47


DEMOLISH DEMOLISH

PARTI

EXISTING BUILDINGS

PUBLIC PLAZAS GREEN PLAZA

EXISTING BUILDINGS

PARTI

PUBLIC PLAZAS DIAGRAMATIC PLAN

AXONMETRIC

PLAZA

GREEN PLAZA PLAZA

NEW BUILDINGS COMMERCIAL RESIDENCE

MEANDERING

ZONNING ZONNING

1- EXISTING ROAD DIVISION 1- EXISTING ROAD DIVISION

2- ENTRY + NEW ROAD DIVISION 2- ENTRY + NEW ROAD DIVISION

DEMOLISH

EXISTING BUILDINGS

PUBLIC PLAZAS GREEN PLAZA

PARTI

PLAZA

GREEN CONNECTING

GREEN CONNECTING FINGER FINGER

ZONNING

3-PRIMARY PRIMARYGREEN GREENCONNECTING CONNECTING FINGERS 3FINGERS

4- SECONDARY GREEN CONNECTING FINGER 4- SECONDARY GREEN CONNECTING FINGER 1- EXISTING ROAD DIVISION

2- ENTRY + NEW ROAD DIVISION

GREEN CONNECTING

FINGER EXISTING BUILDINGS EXISTING BUILDINGS

3- PRIMARY GREEN CONNECTING FINGERS

5- MEANDERING

5- MEANDERING

4- SECONDARY GREEN CONNECTING FINGER

6- PUBLIC PLAZAS

6- PUBLIC PLAZAS

PROPOSED HEIGHTS

PROPOSED HEIGHTS EXISTING BUILDINGS

5- MEANDERING

EXISTING BUILDINGS

PROPOSED HEIGHTS

EXISTING BUILDINGS

EXISTING BUILDINGS

NEW BUILDINGS

NEW BUILDINGS

NEW BUILDINGS

EXISTING + NEW BUILDINGS

EXISTING + NEW BUILDINGS

EXISTING + NEW BUILDINGS

6- PUBLIC PLAZAS


GREEN PLAZA PLAZAS NEW BUILDINGS EXISTING BUILDINGS MEANDERING GREEN CONNECTING FINGERS GREEN CONNECTING FINGERS

MEANDERING

EXISTING BUILDINGS

NEW BUILDINGS

PLAZAS

GREEN PLAZA

49


06 AFFORDABLE HOUSING WORK-IN-PROGRESS

LOCATION

SHARJAH

PROJECT TYPE

RESIDENTIAL

PROJECT SIZE

20,000 m2

STUDIO

ARC 502

YEAR

SPRING 2019

PROFESSOR

CRISTIANO LUCHETTI

PROJECT TEAM

ABANOB ATAIA MARINA NASSIF

PROGRAMS USED

MODELING RHINO 5 AUTOCAD CHAOS GROUP VRAY PHOTOSHOP ILLUSTRATOR INDESIGN

DESCRIPTION Abu Shagharah is located in the heart of Sharjah; however, due to the lack of public spaces and the existing housing typologies it has transformed into an inactive zone. Our proposal consists of a combination of new housing typologies and a wide variety of public spaces. This residential block acts as an important node in the neighborhood as well as a self-sufficient active block.


RESIDENTIAL : STUDIOS

RESIDENTIAL : LOFTS

RESTAURANT RESIDENTIAL : DUPLEXES RESIDENTIAL : FAMILY 9

10

RESIDENTIAL : FAMILY

8

EDUCATION BLOCK

1

COMMUNITY CENTRE

2 3

EXPLODED AXONMETRIC

8

7

9

10

51


AL GHUWAIR

AL SOOR

ZONNING AND NFRASTRUCTURE

ABU SHAGARA

ATTRACTION POINTS AROUND SITE

AL GHUWAIR

5.

AL MAMZAR

RESIDENTIAL ZONE

ACADEMIC ZONE

ACADEMIC ZONE

INDUSTRIAL AREA

AL MAMZAR

AL KHAN

ST

YS

FA

RESIDENTIAL ZONE

AL MAJAZ

AIRPORT ZONE

ABD

Z ST

1

AZI

E1

UL

AL

AL KHAN

ACADEMIC ZONE

ACADEMIC ZONE

AL MAJAZ

G

AL SOOR

RESIDENTIAL ZONE

AIRPORT ZONE

KIN

NG

KI

5.

3

3 3

3

3 3

3 3

3

3

3

3

3

3

3

3

56 3

56 56

56 3

6,0,$

56

56

Abu-Shagara

Parks and Gardens

Site

Water

Hospitals

City movement

Hotels

After Car Removal

Abu-Shagara

$/ 4$

,$' $6,0 / 52$ $/ 4 )$,6$

.,1*

EMPTY SLOTS

Secondary Road

Tertiary Road

,(7<

&2 6+$5 23( -$+ 62& 5$7,9(

2$' $/ 5

)$,6

3$5.

3(75 67$7,21 2/

5 $

Primary Road

Secondary Tertiary Road access to site

5 $

SITE ZONNING

Hotels

Water

ROAD HIERARCHY

Site

Secondary access to site

. $

Parks and Gardens

Empty Lots

5.

Secondary Road

access to site

Hospitals

Primary Road Primary

Pedestrian Bridge

39

. $

Mosques

62&,(7<

Restaurants

-D]HHUD 3DUN

3

-D]HHUD 3DUN

3

Primary access to site

6+$5-$+ ,9( &2 23(5$7

Furniture Road connection tocompany & Shopping Before Car Removal surrounding Functions

Super Markets

3

39

5.

BEFORE & AFTER CAR REMOVAL

3

Pedestrian Bridge

3

.,1*

DENSITY

City movement

3

6+$5-$+ &2 23(5$7,9( 62&,(7<

3$5.

,(6 3$5. /$<<$+ /$'

Road connection to surrounding Functions

3$5. /$<<$+ /$',(6

56

56

ROAD HIERARCHY

SITE ZONNING

D

&2 6+$5 23( -$+ 62& 5$7,9(

B

C

A

D

B

Mosque

Secondary road

Shared Datum (D)

C

%/,& 38 72,/(76

Zone A

Empty Slots

6 6

* %/'

Primary road

*

Zone B

Tertiary road

%/ ' 8 & *

6

6

3$5.,1

Mosque Built by thre residence

(;

(;,67,1* 02648(

%+8 +$,5$ 32/,& ( 67$7,21

%/'* 8 &

& :$//

7(03 )(1&(

& $ )( 7( 5 ,$

'* %/ 8 &

' /

$/,

/ 2 :

%8+$

56 5.(

/,1(

6 6

12:1 0$ 81.

6

$%/( & & 75, (/(&

6

* %/'

%/,& 38 72,/(76

6 6

: $7 (5 7$1.6

1

2

$* 2

8%

Mosque Built by thre residence

.+

%/ ' 8 & *

$ 52 $'

3$5.,1*

52

(

$/ $

/

/ 2 :

'

52$ 251,&+( ,5$ &

,(7<

/ 2 :

Primary Mosque

3(75 67$7,21 2/

,'

$/

EMPTYASLOTS

1

2

$* 2

5$ &2 %8+$,

.+

'

( 52$ 51,&+

Primary Mosque

52 $'

(

Empty Lots

6 6

Zone C

: $7 (5 7$1.6

/,1(

'* %/ 8 &

& $ )( 7( 5 ,$ 56 $5.(

City Centre

12:1 0 81.

$%/( & & 75, (/(&

Abu Shagara

7(03 )(1&(

%/'* 8 &

& :$//

%+8 +$,5$ 32/,& ( 67$7,21

(;

(;,67,1* 02648(

Mosque

Primary road

ROAD HIERARCHY / VEHICULAR ACESS Secondary road

Site

Tertiary road

Primary Commercial Street Secondary stree between public park

AXIS/ ENTRANCE TO THE SITE

Zone A

Zone B

Zone C

PUBLIC SPACES INDOOR

POTENTIAL VIEWS Primary views

RESIDENCE

POSSIBLE ENTRANCE TO SITE

Secondary views

DENSITY

Tertiary views

Tertiary street

PUBLIC PARKS

DENSE RESIDENCE

,$ $ 6,0 $/ 4

LARGE PUBLIC PARK

COMMUNITY CENTRE

2 $' $/ 5 )$,6 .,1* PEDESTRIAN ACESS

AXIS/ ENTRANCE TO THE SITE

POTENTIAL VIEWS

Site

POSSIBLE ENTRANCE TO SITE

Secondary views

DENSITY

PUBLIC SPACES INDOOR

RESIDENCE

Tertiary views

Secondary stree between public park

Primary views PUBLIC SPACES OUTDOORS

ROAD HIERARCHY / VEHICULAR ACESS PARTI DIAGRAM Primary Commercial Street

Tertiary street

PUBLIC PARKS

DENSE RESIDENCE

City Centre

PEDESTRIAN ACESS PUBLIC SPACES OUTDOORS

Empty Slots

Shared Datum (D)

$/ $5 28 %$

/ 2 :


XIS/ ENTRANCE TO THE SITE

POTENTIAL VIEWS Primary views

OSSIBLE ENTRANCE TO SITE

Secondary views Tertiary views

PARTI DIAGRAM PEDESTRIAN PEDESTRIAN ACESS ACESS

AXIS/ AXIS/ ENTRANCE ENTRANCE TO THE TO SITE THE SITE

POTENTIAL POTENTIAL VIEWS VIEWS Primary Primary viewsviews

PUBLIC PARKS

PUBLIC PUBLIC SPACES SPACES OUTDOORS OUTDOORS

RESIDENCE RESIDENCE

PUBLIC PUBLIC SPACES SPACES INDOOR INDOOR

POSSIBLE POSSIBLE ENTRANCE ENTRANCE TO SITE TO SITE

Secondary Secondary viewsviews

DENSITY DENSITY

Tertiary Tertiary viewsviews

PARTI DIAGRAM

DENSE RESIDENCE PUBLICPUBLIC PARKS PARKS

LARGE PUBLIC PARK

COURTYARD + CONTEXT HEIGHT

ROADS HIERARCHY

ENGAGING MASS WITH THE CONTEXT

DENSE DENSE RESIDENCE RESIDENCE

COMMUNITY CENTRE

LARGE LARGE PUBLICPUBLIC PARK PARK

COURTYARD + CONTEXT HEIGHT

ROADS HIERARCHY COMMUNITY COMMUNITY CENTRECENTRE

AVOINDING BUILDING OBSTACLE TO GIVE MAX. VIEWS

GIVING VIEWS FOR BOTH MASSES

CONTINUOUS ENGAGEMENT WITH THE SI

AVOINDING BUILDING OBSTACLE TO GIVE MAX. VIEWS

ENGAGING MASS WITH THE CONTEXT

GIVING VIEWS FOR BOTH MASSES

ENGAGING MASSMASS WITHWITH THE CONTEXT ENGAGING THE CONTEXT

CONTINUOUS CONTINUOUS ENGAGEMENT ENGAGEMENT WITHWITH THE SITE THE SITE

(;

GIVING VIEWS FOR BOTH MASSES GIVING VIEWS FOR BOTH MASSES

CONTINUOUS ENGAGEMENT WITH THE SITE

COURTYARD + CONTEXT HEIGHT COURTYARD + CONTEXT HEIGHT

53


SCALE 1:500

GROUND FLOOR PLAN


SCALE 1:500

LEVEL 3 PLAN

55


8

7

PUBLIC SPACE

3

6 4a

8 4b

AXONMETRIC RAMP

7

5

PUBLIC SPACE

5

6

6 1

2

3

4a

4b

4b 4a

AXONMETRIC RAMP UNROLLED RAMP SURFACE WITH FUNCTIONS

5


10

RESIDENTIAL : FAMILY 9

10

8

EDUCATION BLOCK

1

7

COMMUNITY CENTRE

2 1 2 3

6 4a

4b

AXONMETRIC RAMP

5

5

EXPLODED AXONMETRIC 2

EXPLODED AXONMETRIC

6

4b

3

8

4a

8

SURFACE WITH FUNCTIONS

9

10

7

7

57



59



DESIGN + OTHER


01 SEPTEMBER

DESIGN BUILD

14 proposals | Survey PROJECT TYPE

DESIGN / BUILD

STUDIO

ARC 501

YEAR

FALL 2018

PROFESSOR

AMMAR KHALO

PROJECT TEAM

YASMIN ABDEL REHIM SHAHD ABDUL-GHANI JAWAHER AL-MUTAIRI OMAIMA ALANSARI HIBA ALHAYIK MOZA ALMHEIRI ZENAH FADHIL YASMINE FAHMY FATMA IBRAHIM MALAZ IBRAHIM MARINA NASSIF PRATHYUSH PRADEEP JUMANAH RIZK EMAN SHAFIQ

PROGRAMS USED

MODELING RHINO 5 AUTOCAD PHOTOSHOP ILLUSTRATOR

DESCRIPTION The studio develops a work pod that is site specific to the College of Architecture and Design, and examines how current users use various areas within the building as a work spaces. Collaborating on a single pod design from its conception to its realization at full scale, deploy various fabrication and materials techniques.

PHASE II 7 Proposals | Mock up I

PHASE III

OCTOBER

3 Proposal


63


n

BA ALHAYIK

Aluminium Plate

Aluminium Rood Structure

Aluminium Plate Wood / Felt Roof

Felt Pinup Board 36mm Exterior Polycarbonate Panel 6mm

Exterior Wood Seat Exterior Polycarbonate Panel 6mm

Structural Aluminium Members 5mm Structural Aluminium Members 5mm Wood / Felt Interior Panel 18mm Interior Polycarbonate Panel 6mm Interior Wood Furniture Interior Polycarbonate Panel 6mm Foot Rest Structural Aluminium Members 5mm Interior Polycarbonate Panel 6mm

Structural Aluminium Members 5mm

Exterior Polycarbonate Panel 6mm

Exterior Wood Desk

Foldable Handle

Plywood Base 39 mm

Aluminium Structural Base

Exterior Polycarbonate Panel 6mm

Casters 71 mm

Brushed Aluminium Structure (Bars)

Wood (Ash / Plywood)

Felt (Cloud / Wall)

5-8 mm thickness Light weight tensile structure Vertical Element

40 mm / 36 mm thickness Anchoring Elements Ergonomic Horizontal Element

Acoustic / sound damping

Polycarbonate Panels (Multiwall)

Fabric (Pinup / Cushion)

Stainless Steel (Footrest / Handle)

6 mm thickness Allows for a spectrum of translucency Maluable form Buildable graphics (vinyl layer) Vertical Element

Comfort Color Practicality

Comfort Durability

ARC 501 | SECTION 2 | DESIGN-BUILD | FALL 2018 | AMMAR KALO

ARC 501 | SECTION 2 | DESIGN-BUILD | FALL 2018 | AMMAR KALO

EXPLODED AXONOMETRIC DRAWN BY JUMANAH RIZK

MATERIALS DRAWN BY HIBA ALHAYIK


Ambient Lighting Acoustic Felt Ceiling Interior Wood Panel

0.30 m offset Exteiror Polycarbonate Interior Polycarbonate

Electric Socket Width 0.57 m Standing Desk

Working Desk

Width 0.35 m Length 0.50 m Length 0.43 m Height 0.9 m Height 1.00 m

Backrest

Width 0.50 m Length 0.52 m Width 0.3 m

Height 0.73 m

Exterior Bench

Length 0.43 m Height 0.50 m

Chair

Width 0.55 m Length 0.57 m Height 0.52 m

Pod

Height 1.93 m Footrest Height 0.30 m

Interior Width 1.50 m Exterior Width 1.80 m

ARC 501 | SECTION 2 | DESIGN-BUILD | FALL 2018 | AMMAR KALO

SECTIONAL PERSPECTIVE DRAWN BY ZEENA MAHMOUD

n

Brushed Aluminium Structure (Bars)

Wood (Ash / Plywood)

Felt (Cloud / Wall)

5-8 mm thickness Light weight tensile structure Vertical Element

40 mm / 36 mm thickness Anchoring Elements Ergonomic Horizontal Element

Acoustic / sound damping

65



67


02 STRUCTURES

PROJECT TYPE

DESIGN / BUILD

STUDIO

ARC 342

YEAR

FALL 2016

PROFESSOR

FAYSAL TABBARAH

PROJECT TEAM

MARWA SHARAKY MARK SHEHATA

PROGRAMS USED

MODELING RHINO 5 AUTOCAD PHOTOSHOP ILLUSTRATOR

TENSION CABLE

METAL COMPRESSION MEMBERS

WALKING PLATFORM

DESCRIPTION BRACKETS

The intent of this project is to build a structurally behavioural construct that utilized rigid timber elements ( 2x4 or 2x2) components connected with pin joints. The constructs must also have cable members that undergo tension forces . Furthermore, the design must be able to support itself for a span of 1200mm and carry a minimum load of 75kg.

WOODEN COMPRESSION MEMBERS

EXPLODED AXONOMETRIC


69


03 DIGITAL FABRICATION

PROJECT TYPE

DESIGN / BUILD

STUDIO

ARC 233

YEAR

SPRING 2016

PROFESSOR

GREGORY SPAW

PROGRAMS USED

MODELING LASER CUTTING 3D PRINTING KERN LAB CNC CASTING RHINO 5 PHOTOSHOP ILLUSTRATOR GRASSHOPPER

DESCRIPTION

ITERATION 1

ITERATION 2

1- SPICE GRINDER The intent of this design is to 3D print the skin of a grinder mechanism, while taking ergonomics into consideration. The concept of the design was derived from the process of grinding salt. 2- GIRIH TILES The intent of this project was to form a tileable module in order to fabricate, cast and mount a composition of tiles.

ITERATION 3


CNC MDF TILE

VACUUM FORMED MOLD

PLASTER CASTED TILE

71


04 INTERNSHIP WORK

PROJECT TYPE

BUILDING REHABILITATION

OFFICE

EMBT MIRALLES TAGLIABUE + ILIMELGO

YEAR

SUMMER 2017

SUPERVISOR

ELENA NEDELCU

DESIGN TEAM

VINCENZO LAROCCA ALESSIA APICELLA ANA OTELEA MARZIA FARANDA ANDREA MARCHESIN VALENTINA FRIGENI SARA MUCCIOLA MARCO LORETELLI

PROGRAMS USED

PHYSICAL MODELING RHINO 5 V-RAY PHOTOSHOP ILLUSTRATOR INDESIGN


73


05 SELECTED COLLAGES

PROJECT TYPE

ILLUSTRATION

YEARS

2017 - 2018

PROGRAMS USED

PHYSICAL MODELING RHINO 5 V-RAY PHOTOSHOP ILLUSTRATOR INDESIGN

DESCRIPTION Collages are an alternative form of representation that combine drawings, images, and models to convey a concept and represent a project. I also find collages as one of the most effective ways of illustrating any notion behind any project; for example, circulation, historical development, translation of context, contrasting scenes, and concept development.

FALL 2017 | PROFESSOR SALVADOR GILABERT


FALL 2017 | PROFESSOR IGOR PERAZA | PARTNER RAGHAD ALALI 75


SPRING 2018 | PROFESSOR IGOR PERAZA | IBRAHIM ABDELLATIF


FALL 2017 | PROFESSOR SALVADOR GILABERT 77


YA S M I N E FA H M Y ARCHITECT | DESIGNER CONTACT

y_fahmy@outlook.com (+971) 501535054


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.