Design Economics ARCC 4500 FINAL SUBMISSION
999 & 1011 WELLINGTON STREET WEST
GROUP 9 Shirley Duong #100939920 YATING WEI #100965038 JESSIE CHUNG #100982419 MARISA CORDEIRO #100975470
04
Development Brief
27
Location Gorss Floor Area Occupancy Number of Floors Number of Units Development Proposal
06
28
19
Design Package Parking Level 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor
41
32
Appendix A Financing Summary Loan Amortization B Market Drawing Finish Schedule C LEED Checklist Triple Bottom Line
Pro Forma D
Predevelopment Land Acquisition Design & Planning Professional Service Fee Permits & Development Charges Construction Financing Tarion LEED
Site Analysis Official Plan Key Destination Transit Urban Pattern Future & Current Proposals Parks and Open Space Site Photos
999 & 1011 WELLINGTON STREET WEST
2
Planning Rationale
Development Financial Summary % Equity Equity Required Bank Loan Profit Profit Per Door Cash on Cash Return Development Expenses Revenues
Revenue Summary CRU Units & Parking Price Sheet Tarion Enrollment Breakdown Cash Flow Projections Project Timeline/Schedule Go/No- Go Criteria
Land Titles E Alternate Financing Structure F Work/Task Distribution
63
Site Plan
Development brief
DEVELOPMENT PROPOSAL
1011 & 999 Wellington Street West Ottawa
Subject Property and Proposal of the site The proposal includes severing and selling the R4T portion of lot 991 and developing on the other two properties that are in TM11 zone. The decision to forgo development on lot 991 was dependant on the high cost of land and risk factor associated with larger projects in the case of unsold units. Up-zoning was also to be avoided as to keep the Traditional Mainstreet character and charm of the area and therefore it was crucial to find ways to save on costs. This resulted in the exclusion of lot 991 and severing the R4T portion of lot 999 and selling it since according to the zoning by law, a 18m setback needed to be applied between the R4T and TM11 zone in lot 999. This results in a total buildable floor area of 62.5 m2 in the residential zone. Therefore, it is more profitable to sell the lot in R4T zone and develop the land in the TM11 zone.
Proposal Respecting the built environment in the Hintonburg neighbourhood, 694 m2 of the ground floor is designated to commercial uses, whereas floors 1 to 6 are used for residential purposes. According to the demographic information of the Hintonburg neighbourhood, the common household size is one person household (around 55.4%); the majority of households are tenants (around 63.3%); most people that live in the area are around 20 to 39 years old (around 38%). Responding to the demographics of the neighbourhood, the proposed building (on lots 999 & 1011) includes 18 Bachelor units and 35 one bedroom units for young professionals, seniors, students and business starters. Apart from the rental units, there are also 11 two bedrooms units and 2 three bedroom units for families with children.
4
5
Proposed Lot: Site 999 & 1011 Wellington West Ottawa Ontario
Scale: 1:10000 Radius: 600m
SITE ANALYSIS
Official Plan
Subject Property
Official Plan
The subject properties, 1011 and 999 Wellington West Street are located near the intersection of Wellington Street West and Somerset Street, in the Hintonburg neighbourhood. The properties is bounded by Armstrong Street to the west and Wellington Street West to the east. The lot 1011 is in TM (11) zone while the east side of the lot 999 is in TM 11 (1824) and the west side is in R4T zone. The proposal includes severing and selling the lot that in the R4T zone and developing on the other two properties in the TM11 zone. The two subject properties have a frontage of 46m, a depth of 30m and a total lot area of 1380m2. The two properties are currently used as a parking lot with a temporary food shop in the middle.
The official plan encourages intensification along Traditional Mainstreet zone, which apply to Wellington Street West in this case. For lots 999 and 1011, intensification involves in an infill development, currently used as a private parking lot. Designated as Traditional Mainstreet, the Wellington Street West was developed before 1945, reflected in the urban fabric around the street as it is compact and tight. The buildings are small scale and close to the street with narrow frontages. This results in a more pedestrian and transit friendly areas. Thus, the city want to maintain the pedestrian oriented form while intensifying the area around the Traditional Mainstreet zone.
Land use designation for 999 and 1011 1011 and 999 Wellington Street West both sit in a TM(11) traditional mainstreet zone, which permits a wide range of uses, including retail, service, commercial, office, residential and institutional, but excluding auto related uses. The official plan promotes compact, mixed-use, pedestrianorientated development, such that the zone can be accessed by foot, cycle, transit or automobile. Recognized as part of the Business Improvement Areas, the function of the site serves primarily as business or shopping areas. By imposing the development standards, the continuity of the street can be ensured, the character can be maintained so that the uses area compatible and complement surrounding land uses. (City of Ottawa Official Plan Part 10 Mixed use/Commercial Zones Section 185-198)
6
Proposed Lot: Site 999 & 1011 Wellington West Ottawa Ontario
Scale: 1:10000 Radius: 600m
in separate buildings 9) New gas bars, service stations, automobile sales and drivethrough facilities will not be permitted on traditional mainstreet zone 10) On Traditional Mainstreet surface parking will not be permitted between building and the street. ďźˆ(Official plan Section 3 Designations and Land Use. 3.6.3 Mainstreet)
Secondary Plan According to the Wellington Street West Secondary Plan, the built form on Mainstreet should follows following principles: 1) New buildings within the Traditional Mainstreet should be maximum 6 storeys or 20m, except where identified by the specific area policies. In those cases, the City allow the properties to increase the maximum building height to 9 storeys. 2) New buildings over 4 storeys on Traditional Mainstreet should incorporate architectural articulation and details to form a 2 to 3 storey base to ensure compatibility with the existing low rise, human scale building. 3) Key elements of scale and details from the traditional 1 to 3 storey building and the narrow lot sizes of the Traditional mainstreet (Wellington
Following the official plan, the site should be planned according to following rules: 1) Multi-modal (pedestrian, cycling, transit and vehicular) access between the site and the public street(s), 2) Attractive, safe and usable pedestrian and cycle connections between the site and adjacent communities 3) An enhanced interconnected pedestrian environment that links individual uses on the site, transit stops and continuous public sidewalks on the adjoining streets, and which is generally distinct from internal vehicle routes 4) Measures of sufficient size and quality to relieve the visual impact of surface parking areas 5) The provision of adequate landscaped areas, particularly trees,
West) should be demonstrated to ensure the design of the new building fits the existing urban fabric.
along the perimeter of the site and street frontages 6) The provision of coordinated signage, and 7) Over time, a development that is oriented to the Mainstreet 8) Uses may be mixed in individual buildings or occur side by side
(Wellington Street West Secondary Plan)
7
DEMOGRAPHICS
KEY DESTINATION
Population
Age of Residents
51.1%
Key buildings and open spaces are the elements that characterize the mainstreet. Within Hintonburg, the key buildings includes the church and community center, such as St Francois D'Assise (label as #5) and the Hintonburg community center (#6).
48.9% 0-9 years 8.5%
9790 Total Population
10-19 years 5.5%
20-39 years 38%
The Orpheus Musical theatre (#8) is also located in the neighbourhood. However it is not located along the Wellington Street West.
Household Size x3
x4
x5
x6
8.7%
5.0%
1.5%
0.8%
x2
55.4%
28.7%
Household Tenure
Owner Household 36.7%
In the map, key destinations such as restaurants, retail stores and cafés are also labelled. This includes Simpleraw express (#1), LCBO (#2), Suzy Q Doughnuts (#3), Malenka Originals (#7), Mac's Convinence (#10), The Ministry of Coffee and Social Affair (#11) and Marché Hintonburg Market (#12).
Avg value of owned dwelling $371,375
50-69 years 24%
Services
(Wellington Street West Community Design Plan)
Farmer's market 2
Cost of owned dwellings/month $1279
Tenant Household 63.3%
Cost of rented dwellings/month $874
8
According to the CDP, several buildings contribute to the history of the neighborhood which are included in the City’s heritage reference list for designation in the future. Those buildings are outlined in blue dotted line in the map.
70 years + 9.1%
Convenience store 2
Grocery store 0
Community Garden 0
Restaurant
Fast Food
23
15
Beer Store 1
LCBO Store 1
Heritage Building (Heritage Reference List) Key Destinations 1. SimplyRaw Express 2. LCBO 3. Suzy Q Doughnuts 4. The Hintonburg Public House 5. St Francois D'Assise 6. Hintonburg Community Center
Heritage Building (Part IV Ontario Heritage Act) 7. Malenka Originals 8. Orpheus Musical Theatre 9. Tooth & Nail Brewing Company 10.Mac’s Convinece 11.The MIinistry of Coffee & Social Affair 12. Marché Hintonburg Market
9
Scale: 1:4500 Radius: 250m
TRANSIT
URBAN PATTERN
The Hintonburg neighbourhood is more accessible by public transportation than other areas along Scott Street (also known as Albert Street), the northeast corner is a primary transit hub for the community that includes 34 bus routes. The Bayview O-Train station is the terminal stop of the existing north south Trillium line. The new east west Confederation line will be connected with the existing Trillium line at Bayview Station making downtown more accessible for the community in 2018.
According to CDP, majority of land use in the neighborhood are single detached residential home. However, there are also semidetached, townhouses and row houses, low rise apartments in the area. They are colored in different colors in the map in order to distinguish various types of housing. Along the Traditional Mainstreet (Wellington Street West), most of the buildings are mixed use that includes commercial or office space on the ground floor and residential units above. The variety building types are benefited to the local neighborhood residents and allow them to work close to home.
Three local bus routes provide service on the street through the neighbourhood that can be seen on the map. Route 11 runs on Wellington Street West between Bayshore Shopping center to the west and Rideau Shopping center to the east of downtown. Route 16 provides service along Scott Street westbound to Britannia Park Loop and St Paul University. Route 14 provide service between St Laurent Shopping center and Carlington along Gladstone Ave.
Also, there are several high rise residential buildings and large institutional uses buildings along West Wellington St. (Wellington Street West Community Design Plan)
According to the Ottawa Cycling Plan, Wellington, Holland, Island Park and Scott Street are defined as “Spine or city-wide� cycling route whereas Armstrong and Spencer Street are considered as Community cycling route. Bus The CDP states that in the area, there are around 54% of people getting to work using alternative transportation and there are twice as many people choosing to walk or bike compared to the city average.
O Train Bike
Pedestrian Bike Bus # 14 Bus # 11 Bus # 16
Single Detached house 14.3%
Pedestrian Bike Bus # 14 Bus # 11 Bus # 16
Apartment 39.7% Townhouse/Rowhouse 13% Commercial Mixed use (Residential Above)
(Wellington Street West Community Design Plan)
10
Scale: 1:10000 Radius: 600m
Green Space
11
Institutional (Churches, School, Community)
Scale: 1:10000 Radius: 600m
URBAN PATTERN Building height
FUTURE AND CURRENT PROPOSALS Most of the proposals in the area call upon new developments of midrise apartment buildings, small amounts of low rise apartment projects, one high rise apartment tower and some row house and townhouse projects. The apartment towers are designed for mixed uses include commercial uses at grade and residential units above.
According to CDP, majority of land use in the neighborhood are single detached residential home. However, there are also semidetached, townhouses and row houses, low rise apartments in the area. They are colored in different colors in the map in order to distinguish various types of housing.
According to CDP, 950 units in total will be developed in the neighbourhood from 2006 to 2031 to accommodate 10% population increase during that time. Wellington Street West will absorb most of the new development. With those changes, commercial space will increase about 28%.
Along the Traditional Mainstreet (Wellington Street West), most of the buildings are mixed use that includes commercial or office space on the ground floor and residential units above. The variety building types are benefited to the local neighborhood residents and allow them to work close to home.
(Wellington Street West Community Design Plan)
Future Proposals
Also, there are several high rise residential buildings and large institutional uses buildings along West Wellington St.
1. 979 WELLINGTON ST.
9 storey mixed-use building, containing 57 residential rental units and commercial uses at grade
(Wellington Street West Community Design Plan)
2. 1-3 Storeys ⴀ㌀ 匀琀漀爀攀礀猀
㐀ⴀ㠀 匀琀漀爀攀礀猀 4-8 Storeys 㤀⬀ 匀琀漀爀攀礀猀 9+ Storeys 3.
12
1000 WELLINGTON ST. 6-storey mixed use building with 57 residential units, ground-levelcommercial space, and 1 level of underground parking with 28 parking spaces and indoor bicycle parking. 10 ROSEMOUNT AVE.,1130 WELLINGTON ST. &1140 WELLINGTON ST. 6 storey condo building with ground floor commercial space
4. 37 LADOUCEUR ST. & 53
MERTON ST. 6 unit rowhouses, 3 storeys
5. 175 CARRUTHERS AVE. 2 apartment buildings, 3.5 storey dwelling with 12 units and 18 storey dwelling with 187 units. Commercial space on ground level with a total of 132 parking spaces, 23 of which will be visitors parking. Bicycle parking total of 112 spaces
6. 92 STONEHURST AVE.
6 unit low rise apartment building, 4 storeys
7. 178 CARRUTHERS AVE.
proposed 4 storey, 21-unit lowrise apartment building
8. 190 FORWARD & 192 FORWARD AVE. proposed 3.5 storey stacked townhouse development, 8 units
13
Scale: 1:10000 Radius: 600m
PARKS AND OPEN SPACES
SITE PHOTOS 1
There are several publicly owned parks and open spaces along or within short walking distance of Wellington Street West. Among all those parks, Somerset Square (#2), Hintonburg Park (#3), McCormick Park (#4) and Parkdale Park are recognized as primarily passive recreational public open spaces. Numerous special events over the year are hosted in those parks. The City of Ottawa Official Plan’s target is to achieve 4 hectares (40000m2) of parks and recreational space per 1000 people. This is still an ongoing challenge for the future development.
999 Wellington West
2
(Wellington Street West Community Design Plan)
1.Armstrong Park (Old Ottawa) 2. Somerset Square 3.Hintonburg Park 4.McCormick Park 5.Stirling Carruthers 6.Larache Park 7.Tom Brown Arena
14
8.Bayview Friendship Park
Scale: 1:10000 Radius: 600m
1011 Wellington West
15
3
999 Residential zone
6
PERSPECTIVE
Restaurant in the middle of 999 and 1011
4
1 3
2 5 6
Street View 4
5
N
16
Scale: 1:1500 17
PARKING P A R K I N G /L ESTORAGE V E L U G 2 LEVEL UG2
PERSPECTIVE
UG2 Parking Storage Level 2 GFA 1494 m 1 Parking Space: 24 Locker Space: 39
2
3
4
5
6
7
8
9
LOCKERS: 10 SPACES
F
MECH. ROOM
LOCKER 12 SPACES
E
D LOCKER 4 SPACES
UP
UP
C
B LOCKER 7 SPACES
LOCKER 10 SPACES
A
N
18
1
UG2 1 : 250
19
LEVEL 1 Level 1
P A R K I N G/ LSTORAGE E V E L U G 1LEVEL UG1 PARKING UG1 Parking Storage Level GFA 1494 m2 1 Parking Space: 24 Locker Space: 21 Bicycle Parking: 32
2
3
4
5
6
7
8
Mixed Use Level 1 2 GFA 821m (8837 sqft) SFA 694m2 (7470 sqft) Floor Efficiency: 84.5%
9
LOCKERS: 10 SPACES
1
2
3
5
4
6
7
8
9
F
F
BICYCLE PARKING 12 SPACES
Residential Garden/ Outdoor Amenities
BICYCLE PARKING 20 SPACES
E
E Garbage Room
D
D
LOCKER 4 SPACES
UP
UP
Lobby 127 m²
C SHORT-TERM BICYCLE PARKING 6 SPACES
TO U/G 2
FRONT DESK
Rentable - Retail 321 m² B
LOCKER 7 SPACES
MAILROOM
C
Retail 300 m²
B
Retail 73 m²
LOCKER 10 SPACES
A
A
ENTRANCE TO U/G PARKING
ENTRANCE TO U/G PARKING
N
N
1
UG1 1 : 250
20
3
LEVEL 1 1 : 250
21
L E V E L 22 LEVEL Residential Level 2 GFA 951m2 (10237sqft) SFA 879m2 (9461sqft) Floor Efficiency: 92.4%
L E V E L3 3 LEVEL 1
2
3
4
5
6
7
8
Residential Level 3 GFA 951m2 (8837 sqft) SFA 879m2 (7470 sqft) Floor Efficiency: 92.4%
9
1 Bedroom Suite: 10 2 Bedroom Suite: 2 3 Bedroom Suite: 1
1
2
3
4
5
6
7
8
9
1 Bedroom Suite: 10 2 Bedroom Suite: 2 3 Bedroom Suite: 1
F
F
E 201
3 Bedroom Suite 115 m²
203
202
1 Bedroom
2 Bedroom Suite
55 m²
84 m²
205
204
1 Bedroom 55 m²
1 Bedroom 56 m²
E
206
1 Bedroom
301
3 Bedroom Suite 115 m²
70 m²
303
302
1 Bedroom
2 Bedroom Suite
55 m²
84 m²
304
1 Bedroom 55 m²
305
1 Bedroom 56 m²
306
1 Bedroom 70 m²
D
C
Circulation 108 m²
213
2 Bedroom Suite 84 m²
212
211
1 Bedroom 51 m²
1 Bedroom 52 m²
D
210
1 Bedroom 52 m²
209
208
207
1 Bedroom 53 m²
1 Bedroom 56 m²
1 Bedroom Suite
B
313
2 Bedroom Suite 110 m²
71 m²
212
311
310
309
308
307
1 Bedroom 51 m²
1 Bedroom 52 m²
1 Bedroom 52 m²
1 Bedroom 53 m²
1 Bedroom 56 m²
1 Bedroom Suite
A
LEVEL 2
22
71 m²
N
5
1 : 250
B
A
N
4
C
Circulation 108 m²
LEVEL 3 1 : 250
23
L E V E4L 4 LEVEL Residential Level 4 GFA 863m2 (9289 sqft) SFA 792m2 (8525 sqft) Floor Efficiency: 91.8%
1
L E V E L 55 LEVEL 2
3
4
5
6
7
8
Residential Level 5 GFA 731m2 (7868 sqft) SFA 660m2 (7104 sqft) Floor Efficiency: 90.3%
9
Bachelor Suite: 5 1 Bedroom Suite: 5 2 Bedroom Suite: 2 3 Bedroom Suite: 1
1
2
3
4
5
6
7
8
9
Bachelor Suite: 7 1 Bedroom Suite: 2 2 Bedroom Suite: 3
F
F
E 402
401
3 Bedroom Suite 115 m²
403
2 Bedroom Suite 84 m²
404
1 Bedroom Suite 1 Bedroom Suite 55 m² 55 m²
405
406
1 Bedroom Suite 56 m²
1 Bedroom Suite 60 m²
E
502
D
Bachelor Suite 40 m²
504
Bachelor Suite 40 m²
505
1 Bedroom Suite 65 m²
D
501
2 Bedroom Suite 87 m²
C
Circulation 104 m²
503
1 Bedroom Suite 51 m²
C
Circulation 104 m²
506 512
413
2 Bedroom Suite 88 m²
412
411
Bachelor Suite Bachelor Suite 42 m² 41 m²
410
Bachelor Suite 42 m²
409
Bachelor Suite 42 m²
208
Bachelor Suite 45 m²
1 Bedroom Suite 88 m²
207
1 Bedroom Suite 70 m²
B
511
510
Bachelor Suite Bachelor Suite 41 m² 42 m²
7
1 : 250
24
507
Bachelor Suite 45 m²
B
N
N
LEVEL 4
508
Bachelor Suite 42 m²
A
A
6
509
Bachelor Suite 42 m²
2 Bedroom Suite 81 m²
LEVEL 5 1 : 250
25
LEVEL L E V E L 66 Residential Level 6 GFA 615m 2 (6620 sqft) SFA 544m2 (5856 sqft) Floor Efficiency: 88.5%
1
DEVELOPMENT FINANCIAL SUMMARY 2
3
4
5
6
7
8
Average Selling Price PSF Average Average Selling Selling Price Price PSF PSF Net Revenues Net Revenues Net Revenues Expenses Expenses Expenses Profit Profit Profit Profit Per Door Profit Profit Per Per Door Door Cash on Cash Return Cash on Cash on Cash Cash Return Return Equity Required Equity Equity Required Required % Equity % % Equity Equity Bank Loan Bank Bank Loan Loan % LTC (Debt) % % LTC LTC (Debt) (Debt)
9
Bachelor Suite: 4 1 Bedroom Suite: 2 2 Bedroom Suite: 1 3 Bedroom Suite: 2
F
DEVELOPMENT EXPENSES DEVELOPMENT DEVELOPMENT EXPENSES EXPENSES Site Development (Pre-development) Site Site Development Development (Pre-development) (Pre-development) Design & Planning Design Design & & Planning Planning Marketing & Sales Marketing Marketing & & Sales Sales Construction Construction Construction Financing Financing Financing Tarion Tarion Tarion LEED LEED LEED Total Expenses Total Total Expenses Expenses
E
Outdoor Amenity
Outdoor Amenity 602
601
603
1 Bedroom Suite 53 m²
2 Bedroom Suite 71 m²
1 Bedroom Suite 48 m²
Circulation 89 m²
609
608
607
606
605
3 Bedroom Suite 91 m²
Bachelor Suite 40 m²
Bachelor Suite 42 m²
Bachelor Suite 42 m²
Bachelor Suite 42 m²
GENERAL GENERAL GENERAL
D
$537.00 $537.00 $537.00 $28,687,560.00 $28,687,560.00 $28,687,560.00 $24,066,277.15 $24,066,277.15 $24,066,277.15 $4,621,282.85 $4,621,282.85 $4,621,282.85 $77,021.38 $77,021.38 $77,021.38 71.85% 71.85% 71.85% $6,432,092.57 $6,432,092.57 $6,432,092.57 26.73% 26.73% 26.73% $17,634,184.58 $17,634,184.58 $17,634,184.58 73.27% 73.27% 73.27%
NOTES NOTES NOTES Refer to Revenue Summary Refer to Revenue Refer to Revenue Summary Summary Refer to Pro Forma Refer Refer to to Pro Pro Forma Forma Net Revenue - Expenses Net Net Revenue Revenue -- Expenses Expenses Profit/# of Doors Profit/# Profit/# of of Doors Doors (Profit/Equity) x 100% (Profit/Equity) (Profit/Equity) xx 100% 100% 25% of sub expenses plus 25% of sub expenses plus 25% of sub expenses plus fee interest and and commitment commitment interest interest and commitment fee fee 75% of sub expenses 75% of sub expenses 75% of sub expenses
$1,645,745.07 $1,645,745.07 $1,645,745.07 $2,910,235.48 $2,910,235.48 $2,910,235.48 $1,552,720.20 $1,552,720.20 $1,552,720.20 $16,032,078.90 $16,032,078.90 $16,032,078.90 $589,031.04 $589,031.04 $589,031.04 $1,293,102.70 $1,293,102.70 $1,293,102.70 $43,363.76 $43,363.76 $43,363.76 $24,066,277.15 $24,066,277.15 $24,066,277.15
C Residential Sales Residential Sales Sales Residential Commercial Sales Commercial Sales Sales Commercial Parking Parking Parking Storage Lockers Storage Lockers Lockers Storage Net Revenues Net Revenues Revenues Net
604
3 Bedroom Suite 105 m²
B
REVENUES REVENUES REVENUES
$21,477,280.00 $21,477,280.00 $21,477,280.00 $5,080,280.00 $5,080,280.00 $5,080,280.00 $1,920,000.00 $1,920,000.00 $1,920,000.00 $210,000.00 $210,000.00 $210,000.00 $28,687,560.00 $28,687,560.00 $28,687,560.00
A
N
8
LEVEL 6 1 : 250
26
27
Pro forma
Pro forma
PRO-FORMA
Gross Floor Area (GFA): 53087 sqft
Saleable Floor Area (SFA): 47878 sqft Floor Efficiency: 90.20%
PRO-FORMA
Description
PRE-DEVELOPMENT
Gross Floor Area (GFA): 53087 sqft Saleable Floor Area (SFA): 47878 sqft
Land LandSeverance (Consent)
BUDGET
PRE-DEVELOPMENT
GROSS COST PSF
SALEABLE COST
PERCENTA GE
NOTES
SOURCES
Land Profit
Building Permit Legal - Land Closing $1,954,614.38
$36.82
$40.82
8.12%
$131.25/sqft
Jeff Salmon, Lecture 5, slide 48
-$502,503.75
-$9.47
-$10.50
-2.09%
$131.25/sqft profit on the sale of the R4T portion of the 999 parcel
Jeff Salmon,Lecture 5, slide 48
Land Transfer Tax
$35,567.00
$0.67
$0.74
0.15%
based on Ontario Land Transfer Tax
https://www.ratehub.ca/land-transfer-tax
Legal - Land Closing
$29,319.22
$0.55
$0.61
0.12%
1.5% of land costs
http://www.ottawaishome.com/download.php?id=62
Real Estate Agent Fee
$122,855.91
$2.31
$2.57
0.51%
standard of 5% of land costs (including the intended sale of the R4T portion of the 999 parcel)
http://www.ottawacitizen.com/business/real+estate+commissions+what+does+cost+really+pays/12035050/story.html
Title and Land Search
$160.00
$0.00
$0.00
0.00%
2 full title searches at $80/lot
http://www.ontariotitlesearch.ca/
Title Insurance
$2,361.01
$0.04
$0.05
0.01%
Lawyer Legal Fees
$800.00
$0.02
$0.02
https://quote.fct.ca/
0.00%
http://www.ottawaishome.com/english/resources/home-buyer-closing-costs.html
Registration of Deed
$71.30
$0.00
$0.00
0.00%
http://www.ottawaishome.com/english/resources/home-buyer-closing-costs.html
Phase 1 Environmental Site Assessment
$2,500.00
$0.05
$0.05
0.01%
http://www.envstd.com/what-is-the-cost-of-a-phase-i-environmental-site-assessment/
Total Land Cost per door
$1,645,745.07
$31.00
$34.37
6.84%
$27,429.08
DESIGN & PLANNING
Professional Design Fees
Architect
Structural Engineer
$817,636.02
$15.40
$17.08
3.40%
Group C 5.1% of total construction cost
OAA
$79,510.80
$1.50
$1.66
0.33%
Column 2 0.5% of construction cost
RAIC
Mechanical Engineer
$79,510.80
$1.50
$1.66
0.33%
Column 2 0.5% of construction cost
RAIC
Electrical Engineer
$79,510.80
$1.50
$1.66
0.33%
Column 2 0.5% of construction cost
RAIC
Geotechnical Engineer
$20,000.00
$0.38
$0.42
0.08%
Civil Engineer
$15,902.16
$0.30
$0.33
0.07%
Lawyer
$15,000.00
$0.28
$0.31
0.06%
Project Manager
$477,064.83
$8.99
$9.96
1.98%
Landscape Architect
$50,000.00
$0.94
$1.04
0.21%
as quoted from Geoseismic Geotechnical & Environmental about 1/5 of structural engineer costs
as quoted by Joseph Ha from Joseph Ha Engineering Inc. as quoted by Amos Wong from TFAI
3% of construction fees maximum
http://ottawa.ca/calendar/ottawa/citycouncil/csedc/2012/10-02/07c%20-%20Project%20Management%20Agreement.pdf as quoted by Amos Wong from TFAI
Land Surveyor
$7,000.00
$0.13
$0.15
0.03%
see above
Building Envelope Consultant
$45,000.00
$0.85
$0.94
0.19%
see above
Elevator Installation Consultant
$10,000.00
$0.19
$0.21
0.04%
see above
Quantity Surveyor
$40,000.00
$0.75
$0.84
0.17%
see above
Code Consultant
$10,000.00
$0.19
$0.21
0.04%
see above
Disbursements
$43,653.39
$0.82
$0.91
0.18%
2.5% of total soft costs
see above
Contingency Total Professional Design Fees
$87,306.77
$1.64
$1.82
0.36%
5% of total soft costs
see above
$1,877,095.57
$35.35
$39.21
7.80%
$21,086.77
$0.40
$0.44
0.09%
Permits & Development Charges Site Plan Application
Land Profit Review Fees Land Transfer Tax
Land Land
GROSS COST SALEABLE PERCEN
NOTES
Land
Floor Efficiency: 90.20%
Description
BUDGET
https://ottawa.ca/en/city-hall/planning-and-development/how-develop-property/development-application-review-process-24/development-application-fees
28
SOURCES
https://ottawa.ca/en/city-hall/planning-and-development/how-develop-property/committee-adjustment#consent Jeff Salmon, Lecture 5, slide 48
-2.01% 0.02% 0.14%
Committee of Adjustment $1799 Conservation Authority $100 $131.25/sqft Planning Growth Management $608 $131.25/sqft profit on the sale of the R4T portion of the 999 parcel Initial Engineering Fee: $5,000 Plus Conservation Authority Fee: $100 based on Ontario Land Transfer Tax
0.12% 0.18%
1.5% of land costs 7470 at $0.82/sqft (commercial)
http://www.ottawaishome.com/download.php?id=62 http://documents.ottawa.ca/sites/documents.ottawa.ca/files/documents/gross_floor_fee_sked_en.pdf
$1,954,614.38 $2,507.00
$36.82 $0.05
$40.82 $0.05
7.81% 0.01%
-$502,503.75 $5,100.00 $35,567.00
-$9.47 $0.10 $0.67
-$10.50 $0.11 $0.74
$29,319.22 $43,531.34
$0.55 $0.82
$0.61 $0.91
45617 at $0.82 sqft (residential)
Jeff Salmon,Lecture 5, slide 48 https://ottawa.ca/en/city-hall/planning-and-development/how-develop-property/development-application-review-process-24/development-application-fees https://www.ratehub.ca/land-transfer-tax
$2.31
$2.57
0.49%
Initial Engineering Design Review and Inspection Fee $5,000.00 Title and Land Search $160.00
$0.09 $0.00
$0.10 $0.00
0.02% 0.00%
standard of 5% of land costs (including the intended sale of the R4T portion of the 999 parcel) Value of Infrastructure and Landscaping <$300,000 2 full title searches at $80/lot
Title Insurance Signage Fee
$2,361.01 $565.00
$0.04 $0.01
$0.05 $0.01
0.01% 0.00%
for 2 signs
$800.00
$0.02
$0.02
0.00%
https://quote.fct.ca/ https://ottawa.ca/en/city-hall/planning-and-development/how-develop-property/development-application-review-process-24/development-application-fees#fees-related-planning-applications http://www.ottawaishome.com/english/resources/home-buyer-closing-costs.html
$71.30 $72.00 $2,500.00
$0.00 $0.00 $0.05
$0.00 $0.00 $0.05
0.00% 0.00% 0.01%
$72 for the first 5,000 sqft of gross floor area, plus $9.90 for each additional 1,000 sqft of gross floor area -building to be demolished at 404sqft
http://www.ottawaishome.com/english/resources/home-buyer-closing-costs.html http://documents.ottawa.ca/sites/documents.ottawa.ca/files/bldg_fee_sked_010117_en.pdf http://www.envstd.com/what-is-the-cost-of-a-phase-i-environmental-site-assessment/
Real Estate Agent Fee
Lawyer Legal Fees Registration of Deed Demolition Permit Phase 1 Environmental Site Assessment
Total Land
$122,855.91
http://www.ottawacitizen.com/business/real+estate+commissions+what+does+cost+really+pays/12035050/story.html https://ottawa.ca/en/city-hall/planning-and-development/how-develop-property/development-application-review-process-24/development-application-fees http://www.ontariotitlesearch.ca/
$1,645,745.07
$30.99
$34.36
6.58%
$27,429.08 $150,026.70
$2.83
$3.13
0.62%
60 units at $2300/dwelling 7470 sqft (commercial) at $1.61/sqft
https://ottawa.ca/en/city-hall/planning-and-development/how-develop-property/development-charges/fee-scheduleeffective-august-1-2017#education-development-charges
Development Charges (Residential 1 Bedroom)
$449,010.00
$8.46
$9.38
1.87%
45 units at $9,978/unit (inside the greenbelt)
https://ottawa.ca/en/city-hall/planning-and-development/how-develop-property/development-charges
Architect Development Charges (Residential 2(+) Bedroom) Structural Engineer
$811,010.21 $203,295.00 $79,510.80
$15.28 $3.83 $1.50
$16.94 $4.25 $1.67
3.24% 0.84% 0.32%
OAA see above RAIC
Mechanical Engineer Development Charges (Commercial) Electrical Engineer
$79,510.80 $151,865.10 $79,510.80
$1.50 $2.86 $1.50
$1.67 $3.17 $1.67
0.32% 0.63% 0.32%
Group C 5.1% of total construction cost 15 units at $13,553/unit (inside the greenbelt) Column 2 0.5% of construction cost 7470 sqft2at0.5% $20.33/sqft non-industrial Column of construction cost use (inside the greenbelt) Column 2 0.5% of construction cost
Geotechnical Engineer Road Cutting Permit
$20,000.00 $426.00
$0.38 $0.01
$0.42 $0.01
0.08% 0.00%
Approx. Price: $426.00
$15,902.16
$0.30
$0.33
0.06%
about 1/5 of structural engineer costs
as quoted by Joseph Ha from Joseph Ha Engineering Inc.
Development Sign Lawyer
$655.00 $15,000.00
$0.01 $0.28
$0.01 $0.31
0.00% 0.06%
Development area 1,000 to 5,000
http://documents.ottawa.ca/sites/documents.ottawa.ca/files/bldg_fee_sked_oct2016_en.pdf as quoted by Amos Wong from TFAI
Total ProjectPermits Manager & Development Charges
$1,033,139.91 $477,064.83
$19.46 $8.99
$21.58 $9.96
4.29% 1.91%
3% of construction fees maximum
http://ottawa.ca/calendar/ottawa/citycouncil/csedc/2012/10-02/07c%20-%20Project%20Management%20Agreement.pdf
Landscape Architect
$50,000.00
$0.94
$1.06
0.20%
Marketing & Sales Commissions Land Surveyor
$7,000.00
$0.13
$0.15
0.03%
see above
Marketing Materials Building Envelope Consultant
$45,000.00
$0.85
$0.94
0.18%
see above
Elevator Installation Consultant Architectural 3D model Quantity Surveyor
$10,000.00 $20,000.00 $40,000.00
$0.19 $0.38 $0.75
$0.21 $0.42 $0.84
0.04% 0.08% 0.16%
Cost perDevelopment door Education Charges DESIGN & PLANNING
Professional Design Fees
Civil Engineer
Total Design & Planning
Code Consultant Disbursements Televisions Contingency Total Professional Design Fees
$2,910,235.48
$10,000.00 $500 $43,487.74 $86,975.48
$54.81
$60.78
12.09%
$0.19
$0.21
0.04%
$0.82 $0.01 $1.64
$0.91 $0.01 $1.82
0.17% 0.00% 0.35%
RAIC see above RAIC as quoted from Geoseismic Geotechnical & Environmental https://ottawa.ca/en/business/permits-business-licences-and-applications/right-way
as quoted by Amos Wong from TFAI
Average price for a 6-storey model
see above Michael Ramey Marketing Developer for Mastercraft Starwood: Marketing Company for Soho Champaigne see above
Televisions located at the SoHo Rental office to advertise the site. Average price for 2 2.5% of total soft costs televisions: 5% of total $250.00/ soft costs television
see above Michael Ramey Marketing Developer for Mastercraft Starwood: Marketing Company for Soho Champaigne see above
LEED Green Associate training will be provided to a Sales Representative to better promote our development and it's LEED aspects to potential buyers.
https://leadinggreen.com/canada/ontario/
see above
$1,869,972.82
$35.23
$39.11
7.47%
$300.00
$0.01
$0.01
0.00%
$21,086.77
$0.40
$0.44
0.08%
Printing
$30,000.00
$0.57
$0.63
0.12%
Printing includes: banners, brochures, plans, business cards, on site banners
Professional Branding Package
$15,300.00
$0.29
$0.32
0.06%
Includes a brand identity, a Shopify website setup and packaging design. 12 months @ $1275
http://ianvadas.com/what-we-do/
Sales Set-up
$200,000.00
$3.77
$4.18
0.83%
Sales set-up cost an average of $50/sqft. SoHo Office Center is 4000 sqft
Taylor Bennet: Sales Representative for SoHo
Sales office Rent
$144,000
$2.71
$3.01
0.60%
Based on 300 Lisgar Avenue SoHo Rental Office. Rent is $4000/month. Assuming 36 months at $4000/month
Taylor Bennet: Sales Representative for SoHo
Permits & Development Charges LEED Courses Site Plan Application
https://ottawa.ca/en/city-hall/planning-and-development/how-develop-property/development-application-review-process-24/development-application-fees Michael Ramey Marketing Developer for Mastercraft Starwood: Marketing Company for Soho Champaigne
Sales Office Setup
29
Pro forma
Pro forma
PRO-FORMA
Gross Floor Area (GFA): 53087 sqft
Gross Floor Area (GFA): 53087 sqft
Saleable Floor Area (SFA): 47878 sqft
Saleable Floor Area (SFA): 47878 sqft
Floor Efficiency: 90.20%
Floor Efficiency: 90.20%
Description
BUDGET
GROSS COST SALEABLE PERCEN
Sales Land Representatives (2)- Salary based
$160,000 $1,954,614.38
$3.01 $36.82
$3.34 $40.82
0.66% 7.81%
Land Profit Sales Representatives (2)- Commision based
Sales representatives receive an average of $40,000/year. Assume 3 representatives for 2 Taylor Bennet: Sales Representative for SoHo $131.25/sqft Jeff Salmon, Lecture 5, slide 48 years at $40,000/ rep.
-$502,503.75 $90,000
-$9.47 $1.70
-$10.50 $1.88
-2.01% 0.37%
Jeff Salmon,Lecture slide 48 Taylor Bennet: Sales5,Representative for SoHo
PRE-DEVELOPMENT
Land
NOTES
SOURCES
Land Transfer Tax
$35,567.00
$0.67
$0.74
0.14%
$131.25/sqft profit onreceive the saleanofaverage the R4Tof portion ofper the unit 999 sale. parcel2 representatives: Sales representatives $15000 $15000/ 3 units based on Ontario Land Transfer Tax
Advertising Legal - Land Closing Kick-off Party
$29,319.22
$0.55
$0.61
0.12%
1.5% of land costs
http://www.ottawaishome.com/download.php?id=62
Real Estate Agent Fee
$10,000.00 $122,855.91
$0.19 $2.31
$0.21 $2.57
0.04% 0.49%
standard of 5%for of aland costsparty (including the intended sale R4T portion of the 999 Average price kick-off assuming a big event ofofallthe invited 1000+ people parcel)
Taylor Bennet: Sales Representative for SoHo http://www.ottawacitizen.com/business/real+estate+commissions+what+does+cost+really+pays/12035050/story.html
$160.00 $45,000.00 $2,361.01
$0.00 $0.85 $0.04
$0.00 $0.94 $0.05
0.00% 0.19% 0.01%
2 full title searches at $80/lot Ottawa Citizen: Ottawa's local online newspaper. Assuming the advertisement will be placed on the daily news section online. 90 days $500/day
http://www.ontariotitlesearch.ca/ http://www.ottawacitizen.com/about-ottawa-citizen/pdf/2011-2012/digital%20ratecard%202011-12.pdf https://quote.fct.ca/
$800.00 $50,000.00 $71.30
$0.02 $0.94 $0.00
$0.02 $1.04 $0.00
0.00% 0.21% 0.00%
http://www.ottawaishome.com/english/resources/home-buyer-closing-costs.html Ottawa Citizen: Ottawa's local newspaper. Assuming the advertisement will be placed on http://www.ottawacitizen.com/about-ottawa-citizen/pdf/2012-2013/Print_Ratecard13.pdf the front page skyline. 20 days $2500/day http://www.ottawaishome.com/english/resources/home-buyer-closing-costs.html
$2,500.00 $1,825.00
$0.05 $0.03
$0.05 $0.04
0.01% 0.01%
Facebook Advertisments works like an auction. Assuming we bid for the cost per click (CPC) option and recieve 20 clicks per day for a year @ $0.20 USD or with the current exchange rate $0.25 CAD per click
Online Newspaper Advertising Title and Land Search Title Insurance
Print Newspaper Lawyer Legal FeesAdvertising Registration of Deed
Advertisement on Facebook Phase 1 Environmental Site Assessment
Total Land Cost per door
Advertisement on buzzbuzzhome
DESIGN & PLANNING
$1,645,745.07
$30.99
$34.36
6.58%
$27,429.08
$22,800.00
$0.43
$0.48
0.09%
Professional Design Fees
https://www.ratehub.ca/land-transfer-tax
http://www.envstd.com/what-is-the-cost-of-a-phase-i-environmental-site-assessment/ https://adespresso.com/blog/facebook-ads-cost/
Buzzbuzzhome: Online marketing website for homes. It can be area specific to Ottawa. It receives over 650,000 montlhy visitors. Info provided by the buzzbuzzhome website. Rate https://www.buzzbuzzhome.com/ca/promoteyourproject.aspx was compared to the Eddy Condos. 2 years $950/month
PRO-FORMA
Description
BUDGET
GROSS COST SALEABLE PERCEN
General Requirements and Fees
$1,659,662.81
$31.26
$34.66
6.90%
$20.15/sqft @82365.4sqft
See Above
$148,723.40 $1,954,614.38 $568,000.00
$2.80 $36.82 $10.70
$3.11 $40.82 $11.86
0.62% 7.81% 2.36%
Grass paver $10/sqft Landscape Fabric $31/sqft Tree $200/EA $131.25/sqft @2 Elevator $284000/EA
https://www.improvenet.com/r/costs-and-prices/landscaping-cost-estimator Jeff See Salmon, Above Lecture 5, slide 48
$2,051.19 -$502,503.75
$0.04 -$9.47
$0.04 -$10.50
$0.61/sqft @ 3362.6sqft $131.25/sqft profit on the sale of the R4T portion of the 999 parcel
See Above Jeff Salmon,Lecture 5, slide 48
$35,567.00
$0.67
$0.74
0.01% -2.01% 66.62% 0.14%
based on Ontario Land Transfer Tax
https://www.ratehub.ca/land-transfer-tax
Commitment Fee
$29,319.22 $132,256.38
$0.55 $2.49
$0.61 $2.76
0.12% 0.55%
http://www.ottawaishome.com/download.php?id=62 Jeff Salmon, Lecture 5, slide 32
Real Consultant Estate Agent Fee Report Cost - Initial
$122,855.91-
Cost Consultant - Monthly Inspections Title and Land Search Legal Financing Interest Title Insurance
1.5% of land costs 0.75% of loan amount standard of 5% of land costs (including the intended sale of the R4T portion of the 999 See Quantity Surveyor in Professional Design Fees parcel)
$160.00 $35,000.00
$2,361.01 $421,774.66
$0.04 $7.94
$0.05 $8.81
0.01% 1.75%
Total LawyerFinancing Legal Fees
$589,031.04 $800.00
$11.10 $0.02
$12.30 $0.02
2.45% 0.00%
http://www.ottawaishome.com/english/resources/home-buyer-closing-costs.html
Registration of Deed
$71.30
$0.00
$0.00
0.00%
http://www.ottawaishome.com/english/resources/home-buyer-closing-costs.html
New Home Builder Registration Fee Phase 1 Environmental Site Assessment Warranty Enrollment Fees
PRE-DEVELOPMENT
Land Landscaping Land Elevators
Land Profit Costs Demolition
Total Construction Land Transfer Tax
Financing Legal - Land Closing
Tarion
$16,032,078.90
-
$302.00
$2.31 $0.00 $0.66
$334.85
-
$2.57 $0.00 $0.73
-
0.49% 0.00% 0.15%
NOTES
See Quantity Surveyor in Professional Design Fees 2 full title searches at $80/lot Assume 100 hrs @ $350/hr Based off Appendix A calculated at 3% annual interest
SOURCES
http://www.ottawacitizen.com/business/real+estate+commissions+what+does+cost+really+pays/12035050/story.html http://www.ontariotitlesearch.ca/ Jeff Salmon, Lecture 10, slide 25 https://quote.fct.ca/ Jeff Salmon, Lecture 5, slide 32
$2,500.00 $2,500.00
$0.05
$0.05
0.01%
Fixed Price (Tax Exempt)
Total Land Tarion Cost Legal per door
$48,352.70 $1,645,745.07
$0.91 $30.99
$1.01 $34.36
0.20% 6.58%
Tarion Enrollment Fee Calculation Table
https://www.tarion.com/builders/building-homes-condominiums/warranty-enrolment-fees
0.05%
Assuming $350/hr for 35 hrs of work
Jeff Salmon, Lecture 10, slide 25
Security Deposit
$1,200,000.00
$22.60
$25.06
4.99%
Page 6- Deposit of 20,000/ unit; 60 units
https://www.tarion.com/sites/default/files/2017-07/BB28-Program-Requirements-For-Receipt-and-Release-Of-Security.pdf
DESIGN & PLANNING
Professional Design Fees
$12,250.00 $27,429.08
$0.23
$0.26
https://www.tarion.com/sites/default/files/inline-files/Registration-Information-Sheet.pdf http://www.envstd.com/what-is-the-cost-of-a-phase-i-environmental-site-assessment/
Inspection Architect Fee
$30,000.00 $811,010.21
$0.57 $15.28
$0.63 $16.94
0.12% 3.24%
Assuming Moderate Inspection: Min. 12 inspections (4 inspections / 3units + common Group C 5.1% of total construction elements) $1500/3 units; 60 units cost
https://www.tarion.com/sites/default/files/2017-07/BB38-Low-Rise-Condominium-Inspection-Program.pdf OAA
Structural Engineer Total Tarion
$79,510.80 $1,293,102.70
$1.50 $24.36
$1.67 $27.01
0.32% 5.37%
Column 2 0.5% of construction cost
RAIC
0.32%
Group C 5.1% of total construction cost OAA Billboards located in places like the Ottawa International Airport, in Little Italy, and public Michael Ramey Marketing Developer for Mastercraft Starwood: Marketing Company for Soho Champaigne Column 2 0.5% of construction cost RAIC places i.e. transit advertisements Column 2 0.5% of construction cost RAIC
Mechanical Engineer
$79,510.80
$1.50
$1.67
0.32%
Column 2 0.5% of construction cost
RAIC
$1.67
0.32%
Column 2 0.5% of construction cost
RAIC
LEED Electrical Engineer
$0.42 $1.49
0.08% 0.30%
as quoted from Geoseismic Geotechnical & Environmental http://www.agentinottawa.com/blog/how-much-real-estate-commission-do-brokers-charge-in-ottawa.html
Charrette Geotechnical Engineer Energy Modelling
$15,902.16
$0.30
$0.33
0.06%
Assuming that they will provide full services in selling the residential and commercial units at 5%. 0.05*Total Revenue about 1/5 of structural engineer costs
as quoted by Joseph Ha from Joseph Ha Engineering Inc.
Civil Engineer Registration Fee
$0.28 $11.13
$0.31 $12.34
0.06% 2.45%
2.5% of sales price, assume 80% sold through a co-broker
as quoted by Lecture Amos Wong from Jeff Salmon, 8, slide 30TFAI
Lawyer Combined Certification Review: Design and Construction Project Manager
$1.67 $0.15 $0.42 $0.21 $0.33 $0.03 $0.31
0.32% 0.03% 0.08% 0.04% 0.06% 0.01% 0.06%
RAIC Jeff Salmon, Lecture 9, slide 13 as quoted from Geoseismic Geotechnical & Environmental see above as quoted by Joseph Ha from Joseph Ha Engineering Inc. https://new.usgbc.org/cert-guide/fees#bdc
$15,000.00 $590,632.00
$1.50 $0.13 $0.38 $0.19 $0.30 $0.03 $0.28
Column 2 0.5% of construction cost
$0.38 $1.34
$79,510.80 $7,000.00 $20,000.00 $10,000.00 $15,902.16 $1,500.00 $15,000.00
Comissioning Landscape Total LEEDArchitect
$3,628.96 $477,064.83 $21,234.80 $50,000.00 $43,363.76
$0.07 $8.99 $0.40 $0.94 $0.82
$0.08 $9.96 $0.44 $1.06 $0.91
0.02% 1.91% 0.09% 0.20% 0.18% 0.03%
see above
BuildingEXPENSES Envelope Consultant TOTAL
$45,000.00 $24,066,277.15
$0.85 $453.33
$0.94 $502.66
0.18% 100.00%
see above
Architect Billboard
$811,010.21
$15.28
$16.94
3.24%
Structural Engineer
$20,000.00 $79,510.80
$0.38 $1.50
$0.42 $1.67
0.08% 0.32%
Mechanical Engineer Brokerage Fees Electrical Engineer Sales Commissions - Broker Geotechnical Engineer
$79,510.80
$1.50
$1.67
$79,510.80
$1.50
$20,000.00 $71,363.20
Civil Engineer
Sales Commissions Residential - Co-brokerage Lawyer Legal Fees Project Manager
$477,064.83
$8.99
$9.96
1.91%
3% of construction fees maximum
http://ottawa.ca/calendar/ottawa/citycouncil/csedc/2012/10-02/07c%20-%20Project%20Management%20Agreement.pdf
Residential Units For Sale Landscape Architect
$36,000.00 $50,000.00
$0.68 $0.94
$0.75 $1.06
0.15% 0.20%
Assuming $600/unit 60 units
http://www.mackewlaw.com/ as quoted by Amos Wong from TFAI
Land Surveyor Commercial Units- For Sale Building Envelope Consultant
$7,000.00 $45,000.00 $45,000.00
$0.13 $0.85 $0.85
$0.15 $0.94 $0.94
Assuming $450/hr 100hrs
see above http://www.mackewlaw.com/ see above
Elevator Installation Consultant
$10,000.00
about 1/5 of structural engineer costs
Project gross floor area excluding parking):less than 250,000sq ft $ 0.068/m2 for nonfees member 3% of construction maximum $0.40/sqft
non member as quoted by Amos Wong from TFAI see above http://ottawa.ca/calendar/ottawa/citycouncil/csedc/2012/10-02/07c%20-%20Project%20Management%20Agreement.pdf see above as quoted by Amos Wong from TFAI
$0.19
$0.21
0.03% 0.19% 0.18% 6.45% 0.04%
0.04%
see above
Quantity Surveyor
$40,000.00
$0.75
$0.84
0.16%
see above
Quantity Surveyor
$40,000.00
$0.75
$0.84
0.16%
see above
Code Consultant Construction Contingency Disbursements
$10,000.00
$0.19
$0.21
0.04%
see above
Code Consultant
$10,000.00
$0.19
$0.21
0.04%
$43,487.74 $743,811.33 $86,975.48
$0.82 $14.01 $1.64
$0.91 $15.54 $1.82
0.17% 3.09% 0.35%
2.5% of total costs assume 5% ofsoft construction cost 5% of total soft costs
see above https://www.designingbuildings.co.uk/wiki/Home see above
Disbursements
$43,487.74
$0.82
$0.91
0.17%
2.5% of total soft costs
see above
$1.64
$1.82
0.35%
5% of total soft costs
see above
$35.23
$39.11
7.47%
$1,869,972.82
$35.23
$39.11
7.47%
$412,041.00
$7.76
$8.61
1.71%
Per Unit: Fridge, Washer, Dryer, Range, Range Hood, Dish Washer, Kitchen Sink, Faucet, Toilet, Washroom Sink, Bathtub 1 bedroom: $4040/unit 2 or 3 bedroom: $5231.00/unit (Energy Star and Low-flow fixtures were used)
Contingency Total Professional Design Fees
$86,975.48
$1,869,972.82
$21,086.77
$0.40
$0.44
0.08%
Total Marketing & Sales Commissions
Construction
Contingency Appliances Total Professional Design Fees Permits & Development Charges
$1,552,720.20
$29.25
$32.43
Site Plan Application
see above
Home Depot https://ottawa.ca/en/city-hall/planning-and-development/how-develop-property/development-application-review-process-24/development-application-fees Yardstick for Costing
$21,086.77 $429,140.48
$0.40 $8.08
$0.44 $8.96
0.08% 1.78%
$3,796,947.65
$71.52
$79.30
15.78%
Lower Floor $10.7/sqft UpperFloor: (CLT Panel $29.0/sqft;) Floor (CLT with concrete topping: $45.0/sqft) Stair $7870/flight @28flight
See Above
Exterior Enclosure
$2,823,325.88
$53.18
$58.97
11.73%
Below grade: $41.0/sqft Above Grade: $54.0/sqft Roof $37.12/sqft
See Above
Interior Partitions and Doors
$65,796.28
$1.24
$1.37
0.27%
$142.17/sqft @462.8sqft partition wall
See Above
Finishes
$1,090,517.90
$20.54
$22.78
4.53%
$13.24/sqft @82365.4sqft
See Above
Mechanical
$2,002,302.87
$37.72
$41.82
8.32%
$24.31/sqft @82365.4sqft
See Above
Electrical
$1,017,212.69
$19.16
$21.25
4.23%
$12.35/sqft @82365.4sqft
See Above
Fittings and Equipment
$1,272,545.43
$23.97
$26.58
5.29%
$15.45/sqft @82365.4sqft
See Above
Substructure Hard Costs Main Structure Hard Costs
$14.81/sqft @28976sqft
30
Land Surveyor
Elevator Installation Consultant
$7,000.00
$10,000.00
$0.13
$0.19
$0.15
$0.21
see above
Permits & Development Charges Site Plan Application
https://ottawa.ca/en/city-hall/planning-and-development/how-develop-property/development-application-review-process-24/development-application-fees
31
REVENUE SUMMARY UNIT MODELS
NUMBER
SQ FT.
TOTAL SQ FT
CRU UNITS & PARKING PRICE SHEET
AVERAGE PRICE/ TOTAL VALUE SQ FT
Total Revenues Average Unit Price Cheapest Unit Most Expensive Unit Average Price per sq. ft. Expenses Net Revenues Profit
RESIDENTIAL BACHELOR SUITE Model 1
3
431
1293
$546.67
$732,700.000
Model 2
2
441
882
$530.00
$485,100.000
Model 3
9
452
4068
$540.00
$2,278,080.000
Model 4
2
484
968
$550.00
$532,400.000
Model 5
1
517
517
$580.00
$299,860.000
1 BEDROOM SUITE Model 6
3
549
1647
$526.67
$867,420.000
Model 7
4
560
2240
$510.00
$1,142,400.000
Model 8
3
570
1710
$533.33
$912,000.000
Model 9
6
592
3552
$520.00
$1,847,040.000
Model 10
5
603
3015
$516.00
$1,555,740.000
Model 11
1
646
646
$540.00
$348,840.000
Model 12
1
700
700
$560.00
$392,000.000
Model 13
3
753
2259
$520.00
$1,174,680.000
Model 14
2
764
1528
$510.00
$779,280.000
2 BEDROOM SUITE Model 15
1
764
764
$580.00
$443,120.000
Model 16
1
871
871
$560.00
$487,760.000
Model 17
4
904
3616
$515.00
$1,862,240.000
Model 18
1
936
936
$560.00
$524,160.000
Model 19
2
947
1894
$550.00
$1,041,700.000
Model 20
1
1184
1184
$520.00
$615,680.000
3 BEDROOM SUITE Model 21
1
980
980
$580.00
$568,400.000
Model 22
1
1130
1130
$580.00
$655,400.000
Model 23
3
1238
3714
$520.00
$1,931,280.000
TOTAL RESIDENTIAL
60
40114
$21,477,280.000
COMMERCIAL CRU 1
1
3455
3455
$680.00
$2,349,400.00
CRU 2
1
786
786
$680.00
$534,480.00
CRU 3
1
3230
3230
$680.00
TOTAL COMMERCIAL
7471
$2,196,400.00 $5,080,280.00
PARKING
48
40000
$1,920,000.00
STORAGE LOCKERS
60
3500
$210,000.00
TOTAL REVENUE
$28,687,560.00
32
$28,687,560.00 $357,954.67 $238,140.00 $668,520.00 $537.00 $24,066,277.15 $28,687,560.00 $4,621,282.85
Unit Number
201 202 203 204 205 206 207 208 209 210 211 212 213 301 302 303 304 305 306 307 308 309 310 311 312 313 401 402 403 404 405 406 407 408 409 410 411 412 413 501 502
Unit Type
3 Bedroom 2 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 2 Bedroom 3 Bedroom 2 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 2 Bedroom 3 Bedroom 2 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom Bachelor Bachelor Bachelor Bachelor Bachelor 2 Bedroom 2 Bedroom 1 Bedroom
Area (m2)
115 84 55 55 56 70 71 56 53 52 52 51 84 115 84 55 55 56 70 71 56 53 52 52 51 110 115 84 55 55 56 60 70 45 42 42 42 41 88 87 51
Area (SF)
1238 904 592 592 603 753 764 603 570 560 560 549 904 1238 904 592 592 603 753 764 603 570 560 560 549 1184 1238 904 592 592 603 646 753 484 452 452 452 441 947 936 549
Base Price PSF
$500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $520.00 $520.00 $520.00 $520.00 $520.00 $520.00 $520.00 $520.00 $520.00 $520.00 $520.00 $520.00 $520.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $560.00 $560.00
Sale Price
$619,000.000 $452,000.000 $296,000.000 $296,000.000 $301,500.000 $376,500.000 $382,000.000 $301,500.000 $285,000.000 $280,000.000 $280,000.000 $274,500.000 $452,000.000 $643,760.000 $470,080.000 $307,840.000 $307,840.000 $313,560.000 $391,560.000 $397,280.000 $313,560.000 $296,400.000 $291,200.000 $291,200.000 $285,480.000 $615,680.000 $668,520.000 $488,160.000 $319,680.000 $319,680.000 $325,620.000 $348,840.000 $406,620.000 $261,360.000 $244,080.000 $244,080.000 $244,080.000 $238,140.000 $511,380.000 33 $524,160.000 $307,440.000
Parking
Storage Locker
$40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00
$3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00
$40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00
$40,000.00 $40,000.00
Total
$662,800.00 $495,800.00 $339,800.00 $339,800.00 $345,300.00 $420,300.00 $425,800.00 $345,300.00 $328,800.00 $283,800.00 $283,800.00 $278,300.00 $495,800.00 $687,560.00 $513,880.00 $351,640.00 $351,640.00 $357,360.00 $435,360.00 $441,080.00 $357,360.00 $340,200.00 $335,000.00 $335,000.00 $289,280.00 $659,480.00 $712,320.00 $531,960.00 $363,480.00 $363,480.00 $369,420.00 $392,640.00 $450,420.00 $265,160.00 $247,880.00 $247,880.00 $247,880.00 $241,940.00 $555,180.00 $567,960.00 $311,240.00
Broker Commissions (2% of units)
$13,256.00 $9,916.00
$9,916.00 $13,751.20 $10,277.60
$14,246.40
Co-Brokerage Commissions (2.5% of 80% of units)
$16,570.00 $12,395.00 $8,495.00 $8,495.00 $8,632.50 $10,507.50 $10,645.00 $8,632.50 $8,220.00 $7,095.00 $7,095.00 $6,957.50 $12,395.00 $17,189.00 $12,847.00 $8,791.00 $8,791.00 $8,934.00 $10,884.00 $11,027.00 $8,934.00 $8,505.00 $8,375.00 $8,375.00 $7,232.00 $16,487.00 $17,808.00 $13,299.00 $9,087.00 $9,087.00 $9,235.50 $9,816.00 $11,260.50 $6,629.00 $6,197.00 $6,197.00 $6,197.00 $6,048.50 $13,879.50 $14,199.00 $7,781.00
313 401 402 403 404 405 406 407 408 409 410 411 412 413 501 502 503 504 505 506 507 508 509 510 511 512 601 602 603 604 605 606 607 608 609
2 Bedroom 3 Bedroom 2 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom 1 Bedroom Bachelor Bachelor Bachelor Bachelor Bachelor 2 Bedroom 2 Bedroom 1 Bedroom Bachelor Bachelor 1 Bedroom 2 Bedroom Bachelor Bachelor Bachelor Bachelor Bachelor 2 Bedroom 2 Bedroom 1 Bedroom Bachelor 3 Bedroom Bachelor Bachelor Bachelor Bachelor 3 Bedroom
110 115 84 55 55 56 60 70 45 42 42 42 41 88 87 51 40 40 65 81 45 42 42 42 41 88 71 53 48 105 42 42 42 40 91
1184 1238 904 592 592 603 646 753 484 452 452 452 441 947 936 549 431 431 700 871 484 452 452 452 441 947 764 570 517 1130 452 452 452 431 980
$520.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $540.00 $560.00 $560.00 $560.00 $560.00 $560.00 $560.00 $560.00 $560.00 $560.00 $560.00 $560.00 $560.00 $580.00 $580.00 $580.00 $580.00 $580.00 $580.00 $580.00 $580.00 $580.00
$615,680.000 $668,520.000 $488,160.000 $319,680.000 $319,680.000 $325,620.000 $348,840.000 $406,620.000 $261,360.000 $244,080.000 $244,080.000 $244,080.000 $238,140.000 $511,380.000 $524,160.000 $307,440.000 $241,360.000 $241,360.000 $392,000.000 $487,760.000 $271,040.000 $253,120.000 $253,120.000 $253,120.000 $246,960.000 $530,320.000 $443,120.000 $330,600.000 $299,860.000 $655,400.000 $262,160.000 $262,160.000 $262,160.000 $249,980.000 $568,400.000
$40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00
CRU UNITS & PARKING PRICE SHEET
TOTAL
3727.0
40114.0
$21,477,280.000
$40,000.00 $40,000.00
$40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00
$1,920,000.00
$3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00
$228,000.00
Expense Line Items in Pro forma
Total Revenues Average Unit Price Cheapest Unit Most Expensive Unit Average Price per sq. ft. Expenses Net Revenues Profit
$659,480.00 $712,320.00 $531,960.00 $363,480.00 $363,480.00 $369,420.00 $392,640.00 $450,420.00 $265,160.00 $247,880.00 $247,880.00 $247,880.00 $241,940.00 $555,180.00 $567,960.00 $311,240.00 $245,160.00 $245,160.00 $435,800.00 $531,560.00 $314,840.00 $296,920.00 $296,920.00 $296,920.00 $290,760.00 $574,120.00 $486,920.00 $374,400.00 $343,660.00 $699,200.00 $305,960.00 $305,960.00 $305,960.00 $293,780.00 $612,200.00
$23,625,280.00
$14,246.40
$71,363.20
$16,487.00 $17,808.00 $13,299.00 $9,087.00 $9,087.00 $9,235.50 $9,816.00 $11,260.50 $6,629.00 $6,197.00 $6,197.00 $6,197.00 $6,048.50 $13,879.50 $14,199.00 $7,781.00 $6,129.00 $6,129.00 $10,895.00 $13,289.00 $7,871.00 $7,423.00 $7,423.00 $7,423.00 $7,269.00 $14,353.00 $12,173.00 $9,360.00 $8,591.50 $17,480.00 $7,649.00 $7,649.00 $7,649.00 $7,344.50 $15,305.00
TARION ENROLLMENT BREAKDOWN
Price From $ 200,000
Price To $ 250,000
Unit Enrolment Fee
13% HST
Total
$570.00
$74.10
$644.10
8
$5,152.80
$ 250,000
$ 300,000
$640.00
$83.20
$723.20
19
$13,740.80
Fees
$ 300,000
$ 350,000
$710.00
$92.30
$802.30
12
$9,627.60
$ 350,000
$ 400,000
$780.00
$101.40
$881.40
5
$4,407.00
$ 400,000
$ 450,000
$850.00
$110.50
$960.50
2
$1,921.00
$ 450,000
$ 500,000
$920.00
$119.60
$1,039.60
5
$5,198.00
$ 500,000
$ 550,000
$1,000.00
$130.00
$1,130.00
3
$3,390.00
$ 550,000
$ 600,000
$1,050.00
$136.50
$1,186.50
1
$1,186.50
$ 600,000
$ 650,000
$1,100.00
$143.00
$1,243.00
3
$3,729.00
$650,000
$700,000
$1,150.00
$149.50
$1,299.50
2
$2,599.00
60
$48,352.70
TOTAL
$590,632.00
$23,926,007.25
$28,687,560.00 $357,954.67 $238,140.00 $668,520.00 $537.00 $25,017,593.85 $28,687,560.00 $4,761,552.75
34
Count
35
CASH FLOW PROJECTIONS
CASH FLOW PROJECTIONS TOTAL PER CATEGORY
DESCRIPTION (EXPENSES) Developer's Investment Pre-Development Land Research & Assessment
CASH FLOW DESCRIPTION (EXPENSES)
CASH FLOW
$6,432,092.57 Developer's Investment
$6,432,092.57
$6,432,092.57
Pre-Development -$5,892.31 Land Research & Assessment
-$5,892.31
Land Purchase
Land Purchase -$1,639,852.76
-$1,639,852.76
Design & Planning
Design & Planning
Permit & Development Charges
Permit & Development -$258,284.98 Charges -$258,284.98
-$258,284.98
-$258,284.98 -$258,284.98
Begin Paying Professional Fees
Begin Paying Professional -$83,814.07Fees -$83,814.07
-$83,814.07
-$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07 -$83,814.07
Pay Consultant Fees
Pay Consultant-$58,500.00 Fees
LEED
LEED
Marketing & Sales
Marketing & Sales
Marketing Materials
Marketing Materials -$50,800.00
Professional Branding Package
Professional Branding -$3,060.00 Package -$3,060.00
Sales Office Initial Set Up
Sales Office Initial -$200,000.00 Set Up
Sale Office Lease
Sale Office Lease -$7,578.95
-$7,578.95
-$7,578.95
-$7,578.95 -$7,578.95-$7,578.95 -$7,578.95-$7,578.95 -$7,578.95-$7,578.95 -$7,578.95-$7,578.95 -$7,578.95-$7,578.95 -$7,578.95-$7,578.95 -$7,578.95 -$7,578.95 -$7,578.95 -$7,578.95 -$7,578.95 -$7,578.95 -$7,578.95 -$7,578.95 -$7,578.95-$7,578.95 -$7,578.95-$7,578.95 -$7,578.95-$7,578.95 -$7,578.95-$7,578.95 -$7,578.95-$7,578.95 -$7,578.95
-$7,578.95
-$7,578.95
Sale Office Staff Salary
Sale Office Staff-$13,157.89 Salary
-$13,157.89
-$13,157.89
-$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89 -$13,157.89
-$13,157.89
-$13,157.89
Advertising Costs
Advertising Costs
-$14,962.50
-$14,962.50
-$14,962.50
-$14,962.50 -$14,962.50 -$14,962.50 -$14,962.50 -$7,481.25 -$14,962.50 -$7,481.25 -$14,962.50 -$7,481.25 -$14,962.50 -$7,481.25 -$7,481.25 -$7,481.25 -$7,481.25 -$7,481.25 -$7,481.25 -$2,992.50 -$7,481.25 -$1,496.25 -$7,481.25-$1,496.25 -$7,481.25-$1,496.25 -$2,992.50-$1,496.25 -$1,496.25-$1,496.25 -$1,496.25-$1,496.25 -$1,496.25-$1,496.25 -$1,496.25-$1,496.25 -$1,496.25
Sales Commissions - Broker
Sales Commissions - Broker
Sales Commissions Residential - Co-brokerage
Sales Commissions Residential --$29,531.60 Co-brokerage
-$29,531.60
-$29,531.60
-$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60 -$29,531.60
Legal Fees
Legal Fees
-$4,050.00
-$4,050.00
-$4,050.00 -$4,050.00-$4,050.00 -$4,050.00-$4,050.00 -$4,050.00-$4,050.00 -$4,050.00-$4,050.00 -$4,050.00-$4,050.00 -$4,050.00 -$4,050.00 -$4,050.00 -$4,050.00 -$4,050.00 -$4,050.00 -$4,050.00 -$4,050.00 -$4,050.00-$4,050.00 -$4,050.00-$4,050.00 -$4,050.00-$4,050.00 -$4,050.00-$4,050.00 -$4,050.00-$4,050.00 -$4,050.00-$4,050.00 -$4,050.00-$4,050.00 -$4,050.00
50% Presales Deposits
50% Presales Deposits
Next 80% Presales Deposits
Next 80% Presales Deposits
Next 100% Presales Deposits
Next 100% Presales Deposits
Final Payment For Residential Units
Final Payment For Residential Units
Downpayment for 50% Commercial Units
Downpayment for 50% Commercial Units
Remaining Payment for Commercial Units
Remaining Payment for Commercial Units
Parking Spaces/ Storage Unit Lease
Parking Spaces/ Storage Unit Lease
Begin Construction
Begin Construction
Demolition of Existing Buildings
Demolition of Existing Buildings
Sub-grade Construction
Sub-grade Construction
Above Grade Construction
Above Grade Construction
Building Envelope Construction (Exterior Enclosure)
Building Envelope Construction (Exterior Enclosure)
Electrical, Mechanical, & Plumbing, Elevator Installation
Electrical, Mechanical, & Plumbing, Elevator Installation
Interior Partitions & Doors
Interior Partitions & Doors
Finishes
Finishes
Installation of Appliances
Installation of Appliances
Landscaping
Landscaping
Construction Contingency
Construction Contingency
Remaining Construction Fees
Remaining Construction Fees
Tarion Fee
Tarion Fee
Financial - Commitment Fee
Financial - Commitment Fee
-$132,256.38
-$132,256.38
Financing - Legal Fees
Financing - Legal Fees
-$35,000.00
-$35,000.00
Pay Bank Loan
Pay Bank Loan
Pay Bank Loan - Interest
Pay Bank Loan - Interest
Equity Sources
Equity Sources
Receive 16% Draw from Bank
Receive 16% Draw from Bank
Receive 40% Draw from Bank
Receive 40% Draw from Bank
Recieve 70% Draw from Bank
Recieve 70% Draw from Bank
Recieve 100% Draw from Bank
Recieve 100% Draw from Bank
-$58,500.00
$8,500.00
-$58,500.00 -$10,000.00
-$258,284.98
-$258,284.98
-$5,892.31
-$5,892.31 -$1,639,852.76
-$1,033,139.91
-$258,284.98
-$58,500.00
$8,500.00
-$3,628.96 -$10,000.00
-$3,628.96
-$1,760,095.57 -$83,814.07 -$83,814.07 -$117,000.00 -$43,363.76
-$21,234.80
-$3,060.00
-$3,060.00
$505,347.76
$505,347.76
$505,347.76
-$35,681.60
$505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $505,347.76 $429,545.60
$429,545.60
$429,545.60
$429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60
$429,545.60
$429,545.60
$429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $429,545.60 $1,073,864.00
$2,540,140.00 $426,000.00
$426,000.00 $426,000.00
$1,073,864.00
$1,073,864.00
$1,073,864.00 $1,073,864.00
-$214,570.24 -$949,236.91
-$949,236.91
-$949,236.91
-$949,236.91 -$949,236.91
-$941,108.63
-$941,108.63
-$941,108.63
-$949,236.91
-$1,620,020.33
-$1,620,020.33
-$949,236.91
-$949,236.91
-$941,108.63
-$941,108.63
-$941,108.63
-$1,620,020.33
-$1,620,020.33
-$1,620,020.33
-$32,898.14 -$545,258.95
-$1,620,020.33 -$32,898.14
-$545,258.95 -$412,041.00
-$32,898.14 -$545,258.95
-$148,723.40 -$67,619.21
-$67,619.21
-$67,619.21
-$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$67,619.21 -$414,915.70 -$323,275.68
-$414,915.70 -$323,275.68
-$414,915.70
-$414,915.70 -$414,915.70
-$323,275.68 -$323,275.68
-$67,619.21
-$67,619.21
-$414,915.70
-$414,915.70
-$323,275.68 -$323,275.68
-$149,625.00 -$1,496.25 -$1,496.25 -$71,363.20 -$35,681.60 -$590,632.00 -$29,531.60 -$29,531.60 -$81,000.00 -$4,050.00 -$4,050.00
$8,590,912.00 $505,347.76 $505,347.76 $5,154,547.20 $429,545.60 $429,545.60
$3,436,364.80 $429,545.60 $429,545.60 $4,295,456.00 $1,073,864.00 $1,073,864.00 $2,540,140.00
-$23,431.93
$2,130,000.00
-$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93 -$23,431.93
$4,232,204.30
$505,347.76 $429,545.60 $429,545.60 $1,073,864.00
$426,000.00
-$2,823,325.88
-$4,860,060.99
-$4,860,060.99
-$65,796.28
-$65,796.28
-$1,090,517.90 -$545,258.95 -$412,041.00 -$412,041.00
-$1,090,517.90 -$412,041.00
-$148,723.40 -$148,723.40 -$743,811.33 -$67,619.21 -$1,659,662.81 -$414,915.70 -$1,293,102.70 -$323,275.68 -$132,256.38 -$17,634,184.57 -$421,774.66 -$23,431.93 -$23,431.93
-$148,723.40 -$743,811.33 -$1,659,662.81 -$323,275.68
-$424,439.99 -$5,892.31$2,216,341.23 -$2,306,548.65 $3,291,900.82 -$472,939.99 $325,191.87 -$424,439.99 $336,302.07 $2,216,341.23 $336,302.07 $3,291,900.82 $692,631.67 $325,191.87 $483,658.22 $336,302.07 $483,658.22 $336,302.07 -$251,008.45 $692,631.67 $4,411,684.59 $483,658.22 $1,783,553.52 $483,658.22 -$2,699,882.48 -$251,008.45 $3,447,969.77 $4,411,684.59 -$831,350.79 $1,783,553.52 $1,214,550.27 -$2,699,882.48 $5,802,387.11 $3,447,969.77 $2,111,574.11 -$831,350.79 -$15,292,397.53 $1,214,550.27 MARCHDEC 4 1
JULY 20
MARCHDEC 16 13
APRIL JAN 17 14
MAY 18
FEB 15
JUNE MARCH JULY APRIL 19 16 20 17
37
AUG 21
-$23,431.93
MAY 18
SEPT JUNE 22 19
-$17,634,184.57 -$421,774.66 $2,821,469.53
FEB 3
NOV 12
-$35,000.00 -$17,634,184.57
$4,232,204.30
-$472,939.99
FEB 15
-$132,256.38
$2,821,469.53
JAN 2
JAN OCT 14 11
-$1,293,102.70
$4,232,204.30
-$2,306,548.65
DECSEPT 13 10
$2,130,000.00
-$3,796,947.65
DEC MONTH 1
NOVAUG 12 9
$2,540,140.00
-$2,823,325.88
-$5,892.31 BALANCE
JULY 8
$4,295,456.00
-$3,796,947.65
MONTH
OCT 11
$3,436,364.80
-$2,051.19
BALANCE
SEPT JUNE 10 7
$5,154,547.20
-$429,140.48
$5,290,255.37 $5,290,255.37 $4,621,282.85 $5,802,387.11 $2,111,574.11
MAY 6
-$81,000.00 $8,590,912.00
$2,540,140.00
$5,290,255.37
$5,290,255.37 $5,290,255.37
AUG 9
-$4,050.00
-$71,363.20 -$590,632.00
-$2,051.19
$4,232,204.30 $5,290,255.37
JUNE MARCH JULY APRIL 7 4 8 5
-$35,681.60 -$29,531.60
-$149,625.00
-$429,140.48
$2,821,469.53
FEB 3
-$250,000.00 -$1,496.25
-$35,000.00 -$17,634,184.57
$2,821,469.53
-$144,000.00
$426,000.00 $426,000.00
-$214,570.24
-$32,898.14
-$23,431.93
-$144,000.00 -$7,578.95 -$250,000.00 -$13,157.89
$2,540,140.00
$426,000.00 $426,000.00
-$214,570.24
-$50,800.00 -$15,300.00
-$2,051.19 -$214,570.24
36
-$43,363.76
-$117,000.00
-$200,000.00
$2,540,140.00
$426,000.00 $426,000.00
-$2,051.19
MAY 6
-$21,234.80
-$200,000.00
$2,540,140.00 $2,540,140.00
APRIL JAN 5 2
-$1,760,095.57
-$15,300.00
-$3,060.00
-$35,681.60
-$23,431.93
-$1,033,139.91 -$83,814.07
-$50,800.00
-$3,060.00 -$3,060.00-$3,060.00 -$3,060.00 -$200,000.00
-$4,050.00
$6,432,092.57
-$1,639,852.76
-$50,800.00 -$3,060.00
TOTAL PER CATEGORY
AUG 21
$5,290,255.37 $5,290,255.37 -$15,292,397.53 SEPT 22
$4,621,282.85
PROJECT TIMELINE/SCHEDULE 2017
2018
Dec
Jan
PROJECT TIMELINE/SCHEDULE 2019
Feb
March
April
May
June
July
Aug
Sept
Oct
Nov
Dec
Jan
Feb
Market Analysis Predevelopment
Site Selection Secure Land Due Diligence Site Analysis Schematic Design Permit & Construction Drawing Marketing Contract Document Development
Site Preparation & Demolistion Sub-grade Construction Above grade Construction Building Envelope Electrical Mechanical & Plumbing Interior Partition
Close out
Finishes Landscaping Construction close out & Inspection Tenant Move In
38
39
March
April
May
June
July
Aug
Sept
GO / NO-GO CRITERIA
APPENDIX A FINANCING SUMMARY TOTAL EXPENSES
GO! ENOUGH FUNDING?
$24,066,277.15
FINANCING PACKAGE Bank Loan @ 3% interest rate
$17,634,184.58
Equity Investment
$6,432,092.57
Total Financing
$24,066,277.15
SOURCE OF EQUITY
LOAN INTERST UNDER 12%? SATISFACTORY BIDS?
Developer
$6,432,092.57
Total Equity Investment
$6,432,092.57
INTEREST
80% PRESALE?
Bank Loan @ 3% interest rate for 18 month term
$421,774.66
Total Interest Paid
$421,774.66
MINOR ZONING VARIANCE? SITE PLAN CONTROL? SITE CONDITIONS? 20% CASH ON CASH RETURN
NO GO!
DEVELOPMENT DEMAND?
40
41
APPENDIX A
T Y P I C A L B- MARKET 1 B E D R ODRAWING OM SUITE APPENDIX
LOAN AMORTIZATION
Scale: 1:50 2 Scale Area: 56m1:50 (602 sqft) 2 Area 56m (602 sqft) Unit type: 1 Bedroom
Loan Summary Number of Payments: Periodic Payment: 1st Payment Due: Last Payment Due: Total All Payments:
$17,634,184.58 3.0000% 03/01/2018 Monthly $421,774.66
WELLINGTON STREET WEST
18 $1,003,108.85 04/01/2018 09/01/2019 $18,055,959.24
N
Loan Amount: Annual Interest Rate: Loan Date: Payment Frequency: Total Interest Due:
N
Payment Schedule Date
Loan: 1:1 2:1 3:1 4:1 5:1 6:1 7:1 8:1 9:1
03/01/2018 04/01/2018 05/01/2018 06/01/2018 07/01/2018 08/01/2018 09/01/2018 10/01/2018 11/01/2018 12/01/2018
10:1 11:1 12:1 13:2 14:2 15:2 16:2 17:2 18:2
01/01/2019 02/01/2019 03/01/2019 04/01/2019 05/01/2019 06/01/2019 07/01/2019 08/01/2019 09/01/2019
Payment
Interest
Principal
Balance
0.00 1,003,108.85 1,003,108.85 1,003,108.85 1,003,108.85 1,003,108.85 1,003,108.85 1,003,108.85 1,003,108.85 1,003,108.85
0.00 44,085.46 41,687.90 39,284.35 36,874.79 34,459.20 32,037.58 29,609.90 27,176.15 24,736.32
0.00 959,023.39 961,420.95 963,824.50 966,234.06 968,649.65 971,071.27 973,498.95 975,932.70 978,372.53
17,634,184.58 16,675,161.19 15,713,740.24 14,749,915.74 13,783,681.68 12,815,032.03 11,843,960.76 10,870,461.81 9,894,529.11 8,916,156.58
1,003,108.85 1,003,108.85 1,003,108.85 1,003,108.85 1,003,108.85 1,003,108.85 1,003,108.85 1,003,108.85 1,003,108.79
22,290.39 19,838.35 17,380.17 14,915.85 12,445.36 9,968.71 7,485.86 4,996.80 2,501.52
980,818.46 983,270.50 985,728.68 988,193.00 990,663.49 993,140.14 995,622.99 998,112.05 1,000,607.27
7,935,338.12 6,952,067.62 5,966,338.94 4,978,145.94 3,987,482.45 2,994,342.31 1,998,719.32 1,000,607.27 0.00
BEDROOM 11' - 6" x 11' - 5"
KITCHEN & DINING 17' - 9 1/2" x 11' - 7"
BALCONY 20'- 8" x 6'- 6"
D W
BATHROOM
STUDY
LIVING ROOM
6' - 0" x 9' - 1"
15' - 3 1/2" x 8' - 8 1/2"
8' - 0 1/2" x 5' - 6"
Last payment decreased by $0.06 due to rounding
Calculation method: Normal, 360 days per year financial-calculators.com
42
43
1 BEDROOM SUITE
#/Year
APPENDIX B FINISH SCHEDULE Tier 1 APPENDIX B - FINISH SCHEDULE FOR 3 TIERS OF FINISHES - TIER 1 FINISH (Tier 1) QTY
PRODUCT
NAME
PHOTO
8830-58 Profile Kitchen Countertop in Kitchen Counter Elemental Concrete 1 Top Bathroom Floor 44 Tiles Bathroom Wall 100 Tiles
Living, Kitchen, Bedroom, 669 Flooring APPLIANCE (Tier 1) QTY PRODUCT
1 Fridge
1 Stove Range
1 Dishwasher
1 Range Hood
12x24 Fragment Graphite Porcelain 12 mm + Pad Farmstead Hickory Laminate Flooring (14 sq. ft. / case)
18.7 cu. ft. Refrigerator with Bottom Mount Freezer Drawer in Stainless Steel 30 Inch White Free Standing Electric Standard Clean Ran 24" Top Control Built-In Tall Tub Dishwasher in White with Stainless Steel Tub and Steam Cleaning, 46 dBA 30 Inch Range Hood with dishwasher-safe full-width grease filters
PHOTO
6867.35
SCHEDULE
Enigma
# 12-365
12X12
Graphite Procelain $2.98 / sq. ft
Enigma
# 12-365
12X12
Graphite Procelain $2.98 / sq. ft
SOURCE https://www.homedepot.ca/ en/home/p.8830-58-profile2300-25-12-inch-x-72-inchkitchen-countertop-inelemental$104 concrete.1000788699.html https://www.homedepot.ca/ en/home/p.12x24-fragmentgraphite$131.12 porcelain.1000777526.html https://www.homedepot.ca/ en/home/p.12x24-fragmentgraphite$298 porcelain.1000777526.html https://www.homedepot.ca/ en/home/p.12-mm--padfarmstead-hickorylaminate-flooring-14-sq--ft-$849.63 case.1000802752.html
Belanger Laminates Inc
12x24 Fragment Graphite Porcelain
NAME
MANUFACTURER
APPENDIX B FINISH SCHEDULE Tier 1
MODEL NO.
DIMENSIONS
# 1152349069 1/2x72
COLOUR/FINISH
Elemental Concrete
PRICE
$104/each
TrafficMASTER
# 36788200241
47.52x6
Laminated wood
$1.27 / sq. ft.
MANUFACTURER
MODEL NO.
DIMENSIONS
COLOUR/FINISH
PRICE
Whirlpool
# WRB329LFBM 33.38x67x29.75 Stainless Steel
GE
# JCBS630DKW 24.72x44.72x26 W .84 Stainless Steel
GE
Whirlpool
# GDWF400VW W 24x34.5x23.5
# WVU37UC0F S
44
Energy Star Stainless Steel
21.21x4.84x29. Energy Star 94 Stainless Steel
PRICE/UNIT
$598.00/each
SOURCE https://www.homedepot.ca/ en/home/p.187-cu-ftrefrigerator-with-bottommount-freezer-drawer-instainless$1,098 steel.1000802600.html https://www.homedepot.ca/ en/home/p.30-inch-whitefree-standing-electricstandard-clean$598 ran.1001062762.html
$448.00/each
https://www.homedepot.ca/ en/home/p.24-top-controlbuilt-in-tall-tub-dishwasherin-white-with-stainlesssteel-tub-and-steamcleaning-46$448 dba.1000739841.html
$1098.00/each
$218.00 / each
PRICE/UNIT
https://www.homedepot.ca/ en/home/p.30-inch-rangehood-with-dishwasher-safefull-width-grease$218 filters.1001057010.html
8.4 cu. ft. Electric Combination Washer - Dryer Combined 1 Washer & Dryer in White FURNISHING (Tier 1) QTY PRODUCT NAME
1 Base Cabinet
Wall Cabinet PLUMBING (Tier 1) QTY PRODUCT
1 Toilet
1 Sink
1 Bathtub
1 Shower Head
1 Kitchen Faucet 1 Kitchen Sink ACCESSORIES (Tier 1) QTY PRODUCT
PHOTO
Whirlpool
# YWET4027E W
32x71.75x27.25 Stainless Steel
$1598.00/each
MANUFACTURER
MODEL NO.
DIMENSIONS
PRICE
COLOUR/FINISH
https://www.bathdepot.ca/k $159.00 ui-w2430-2-12.html
# TLB24-BLSD 34.5x24x24
KUI-W2430-2-12
KUIZEN
KUI-W2430-212 24x13.5x30
Dark Brown Thermoplastic (MDF)
$159.00/ each
NAME PHOTO Cadet 3 2-Piece 4.8 LPF Single Flush Elongated Bowl Toilet in White
MANUFACTURER
MODEL NO.
COLOUR/FINISH
PRICE
American Standard
30.25x30.75x15 Eco Option # 2621101.020 .75 Procelain
$248.00 / each
GLACIER BAY
# 13-0012-4W- 17.13x7.25x20. GB 25 Procelain
$32.98 / each
American Standard
# 0319LH.020 60x15.75x30
Procelain
$199.00/each
Moen
# 26000
CSA Certified Stainless Steel
$68.98/each
Oval Drop-In Bathroom Sink in White Cadet 5 Feet Enamel Steel Bathtub with Left-Hand Outlet in White Attract 4-inch 6Function Hand Shower with Magnetix Docking System in Chrome Banbury 1 Handle Kitchen Faucet with Matching Pullout Wand - Glacier Finish
Moen
# 87017W
9.63x9.94
Single Bowl Sinks
Kindred
# 31206152
15.44x6
MANUFACTURER
MODEL NO.
DIMENSIONS
NAME
PHOTO
5.5x10
45
Eco OptionStainless Steel
SOURCE
$169.00/ each
EBSU
DIMENSIONS
PRICE/UNIT
https://www.rona.ca/en/sandiego-2-door-lower-cabinet$169.00 75396232
White Thermoplastic (MDF)
2-Door Lower Kitchen Cabinet - White
https://www.homedepot.ca/ en/home/p.84-cu-ft-electriccombination-washer--dryer-in$1,598 white.1000830141.html
PRICE/UNIT
$248
32.98
199
$68.98
$139.00/each
$139
Stainless Steel
$122.00/each
$122
COLOUR/FINISH
PRICE
PRICE/UNIT
SOURCE https://www.homedepot.ca/ en/home/p.cadet-3-2-piece48-lpf-single-flushelongated-bowl-toilet-inwhite.1000712406.html https://www.homedepot.ca/ en/home/p.oval-drop-inbathroom-sink-inwhite.1000671624.html https://www.homedepot.ca/ en/home/p.cadet-5-feetenamel-steel-bathtub-withleft-hand-outlet-inwhite.1000135830.html https://www.homedepot.ca/ en/home/p.attract-4-inch-6function-hand-shower-withmagnetix-docking-systeminchrome.1000845622.html https://www.homedepot.ca/ en/home/p.banbury-1handle-kitchen-faucet-withmatching-pullout-wand--glacierfinish.1000427259.html https://www.homedepot.ca/ en/home/p.single-bowlsinks.1000811066.html SOURCE
APPENDIX B FINISH SCHEDULE Tier 2 Toilet Paper 1 Holder
Eclipse Tp Holder Chrm Brushed
1 Shower Rod
1 Towel Bar 1 Mirror LIGHTING FIXTURES (Tier 1) QTY PRODUCT
2 Bathroom Light
4 Ceiling Light
APPENDIX B FINISH SCHEDULE Tier 2
Loft
# 022852-158M10 9x2.75
Stainless Steel
$9.00/each
Builder Rod Chrome
Zenith Products
# 641S
1.25x66.25
Stainless Steel
$15.98/each
$15.98
Porcelana 24 Inch. Towel Bar Only Clear
Moen
# 9224CLR
27x1
Acrylic
$11.98/each
$11.98
$79.96 / each
Century Mirror
Tangerine Mirror Co # SR110107
2x29
glass
NAME PHOTO 4 Inch LED Recessed/Surfac e White Disk Light 4 Inch LED Recessed/Surfac e White Disk Light
MANUFACTURER
MODEL NO.
DIMENSIONS
COLOUR/FINISH
PRICE
Halo
# SLD405830W HC 5.75x1x5.75
Energy Star LED
$44.97 / each
Halo
# SLD405830W HC 5.75x1x5.75
Energy Star LED
$44.97 / each
$9
$79.86
https://www.homedepot.ca/ en/home/p.eclipse-tpholder-chrmbrushed.1000844048.html https://www.homedepot.ca/ en/home/p.builder-rod--chrome.1000163403.html https://www.homedepot.ca/ en/home/p.porcelana-24inch-towel-bar-onlyclear.1000812792.html https://www.homedepot.ca/ en/home/p.centurymirror.1000661340.html
Living, Kitchen, Bedroom, 669 Flooring APPLIANCE (Tier 2) QTY PRODUCT
1 Fridge
PRICE/UNIT
SOURCE https://www.homedepot.ca/ en/home/p.4-inch-ledrecessedsurface-white$89.94 disk-light.1000764637.html https://www.homedepot.ca/ en/home/p.4-inch-ledrecessedsurface-white$179.88 disk-light.1000764637.html
1 Stove Range
Dishwasher
TOTAL FINISH COST = $6867.35 APPENDIX B - FINISH SCHEDULE FOR 3 TIERS OF FINISHES - TIER 2 FINISH (Tier 2) QTY
PRODUCT
NAME
P-379CA Profile 2300 25 Kitchen Kitchen Counter Countertop in Safari Stone 1 Top
Bathroom Floor 44 Tiles
12-inch x 12-inch x 6 mm Ceramic Octagon/Dot Mosaic Tile in Matte White (10 sq. ft. / case)
Bathroom Wall 100 Tiles
12-inch x 12-inch x 6 mm Ceramic Octagon/Dot Mosaic Tile in Matte White (10 sq. ft. / case)
PHOTO
MANUFACTURER
SCHEDULE MODEL NO.
Belanger Laminates Inc #1152349069
Daltile
Daltile
DIMENSIONS inches
1/2-inch x 72inch
# 65012OCT01C C1P2 12x12
# 65012OCT01C C1P2 12x12
46
8138.7 COLOUR/FINISH
Safari Stone
Mosaic Tile
Mosaic Tile
PRICE
$104/each
PRICE/UNIT
SOURCE https://www.homedepot.ca/ en/home/p.7732-46-profile2300-25-12-inch-x-72-inchkitchen-countertop-inbutterum$104 granite.1000169641.html
$4.84 / sq. ft.
https://www.homedepot.ca/ en/home/p.12-inch-x-12inch-x-6-mm-ceramicoctagondot-mosaic-tile-inmatte-white-10-sq-ft-$212.96 case.1001021393.html
$4.84 / sq. ft.
https://www.homedepot.ca/ en/home/p.12-inch-x-12inch-x-6-mm-ceramicoctagondot-mosaic-tile-inmatte-white-10-sq-ft-$484 case.1001021393.html
10mm Thick x 6inch W Laminate Flooring in Hickory Dark Grey NAME PHOTO 21.6 cu. ft. French Door Refrigerator in Black 30-inch 5 cu. ft. Free-Standing Gas Range with Steam Clean Convection in Stainless Steel Gallery 24-inch Built-In Dishwasher with Plastic Tub in White
30 Inch Stainless Steel Range Hood Range Hood 8.4 cu. ft. Electric Combination Washer - Dryer Combined Washer & Dryer in White FURNISHING (Tier 2) QTY PRODUCT NAME PHOTO
Base Cabinet
Wall Cabinet PLUMBING (Tier 2) QTY PRODUCT
Toilet
San Diego 2Door Kitchen Cabinet - 30" White
30-inch Twodoor wall cabinet NAME Cadet 3 2-Piece 6.0 LPF Dual Flush Elongated Bowl Toilet
PHOTO
https://www.homedepot.ca/ en/home/p.10mm-thick-x-6inch-w-laminate-flooring-inhickory-dark$863.01 grey.1001042194.html
TrafficMASTER
# 44828
51x6.26
Laminated wood
$1.29 / sq. ft.
MANUFACTURER
MODEL NO.
DIMENSIONS
COLOUR/FINISH
PRICE
Samsung
# RF220NCTAB C 21.6 cu. ft.
Black Stainless Steel
$1298.00/each
GE
# JCGB720SEJ SS 26.25x47.5x30
Stainless Steel
$798.00/each
$798
Frigidaire Gallery
# FGID2466QW 25X33.5X24
Energy Stainless Steel
$578.00 / each
$578
GE Profile
# PVX7300SJSS C 20X5.5X30
Energy Stainless Steel
$388.00 / each
$388
Whirlpool
# YWET4027E W
32x71.75x27.25 Stainless Steel
MANUFACTURER
MODEL NO.
DIMENSIONS
COLOUR/FINISH
$1,598.00 / each PRICE
$1,598 PRICE/UNIT
SOURCE
$179 / each
https://www.bathdepot.ca/k $199 ui-w3030-2-21.html
EBSU
#TLB30-BLSD 30x24x34.5
KUIZEN
KUI-W3030-221 30x13.5x30
White Thermoplastic (MDF)
$199 / each
MANUFACTURER
MODEL NO.
COLOUR/FINISH
PRICE
American Standard
# 3380516ST.02 Eco Option 0 29.75x31x15.75 Procelain
47
$1,298
SOURCE https://www.homedepot.ca/ en/home/p.216-cu-ftfrench-door-refrigerator-inblack.1000652735.html https://www.homedepot.ca/ en/home/p.30-inch-5-cu-ftfree-standing-gas-rangewith-steam-cleanconvection-in-stainlesssteel.1000845227.html https://www.homedepot.ca/ en/home/p.gallery-24-inchbuilt-in-dishwasher-withplastic-tub-inwhite.1000798611.html https://www.homedepot.ca/ en/home/p.30-inchstainless-steel-rangehood.1001057792.html https://www.homedepot.ca/ en/home/p.84-cu-ft-electriccombination-washer--dryer-inwhite.1000830141.html
https://www.rona.ca/en/sandiego-2-door-lower-cabinet$179 75396233
White Thermoplastic (MDF)
DIMENSIONS
PRICE/UNIT
$268.00/each
PRICE/UNIT
SOURCE https://www.homedepot.ca/ en/home/p.cadet-3-2-piece60-lpf-dual-flush-elongatedbowl$268 toilet.1000719868.html
APPENDIX B FINISH SCHEDULE TIER 2 Sink
Bathtub
Shower Head
Kitchen Faucet
Kitchen Sink ACCESSORIES (Tier 2) QTY PRODUCT Toilet Paper Holder
Colony 4-inch Countertop Sink Basin Avenue 60-inch Alcove Bathtub with Right-Hand Drain Refresh Rainshower with InvigoRain/Imme rsion and 7Function Hand Shower in Chrome
Shower Rod
Zen Toilet Paper Holder Nickel Zenna Home NeverRust 51"86" Alum. Adjustable Tension Mount Shower Rod in Satin Nickel
Towel Bar
Mirror LIGHTING FIXTURES (Tier 2) QTY PRODUCT
2 Bathroom Light
# 346403.02
MAAX
# 105927-000002-002 31x21.25x59.88 Procelain
Moen
Banbury SingleHandle Kitchen Faucet with Matching Pullout Wand in Chrome Homestyle 1.0 Topmount Stainless Steel Sink NAME
American Standard
Moen
PHOTO
# 25510
17.5x7.5x20.5
5x14
# 87017
9.63x9.94
Procelain
Stainless Steel Eco OptionStainless Steel
APPENDIX B FINISH SCHEDULE TIER 3
$299.00/each
https://www.homedepot.ca/ en/home/p.colony-4-inchcountertop-sink$69.98 basin.1000469250.html https://www.homedepot.ca/ en/home/p.avenue-60-inchalcove-bathtub-with-righthand$299 drain.1000744545.html
$99.98/each
https://www.homedepot.ca/ en/home/p.refreshrainshower-withinvigorainimmersion-and-7function-hand-shower-in$99.98 chrome.1000797456.html
$69.98/each
$159.00/each
Blanco
# 401199
21x8
Stainless Steel
$224.00/eacj
MANUFACTURER
MODEL NO.
DIMENSIONS
COLOUR/FINISH
PRICE
Loft
# 022963-410M10 8.75x3.25
# 886ALBN
Zen 18 Inch Towel Bar Nickel
Loft
# 022968-410M10 22.25x4.15
24 Inch FlatFramed Mirror, Fog-Free
Home Decorators Collection
# 83002
35.35x0.75x24
Glass
$94.95/each
MANUFACTURER
MODEL NO.
DIMENSIONS
COLOUR/FINISH
PRICE
Halo
# SLD606830W HC 7.75x1x7.75
48
Stainless Steel
$9.5/each
Zenith
NAME PHOTO 6 Inch LED Recessed/Surfac e White Disk Light
1.38x1.38x86
Nickel
Nickel
Energy Star LED
$25.98/each
$16.50/each
$44.97/each
https://www.homedepot.ca/ en/home/p.banbury-singlehandle-kitchen-faucet-withmatching-pullout-wand-in$159 chrome.1000105954.html https://www.homedepot.ca/ en/home/p.homestyle-10topmount-stainless-steel$224 sink.1000461651.html PRICE/UNIT
SOURCE https://www.homedepot.ca/ en/home/p.zen-toilet-paperholder$9.50 nickel.1000844058.html
https://www.homedepot.ca/ en/home/p.zenna-homeneverrust-51-86-alumadjustable-tension-mountshower-rod-in-satin$25.98 nickel.1000856527.html https://www.homedepot.ca/ en/home/p.zen-18-inchtowel-bar$16.50 nickel.1000844055.html https://www.homedepot.ca/ en/home/p.24-inch-flatframed-mirror-fog$94.95 free.1000841228.html SOURCE https://www.homedepot.ca/ en/home/p.6-inch-ledrecessedsurface-white$89.94 disk-light.1000762252.html
4 Ceiling Light
6 Inch LED Recessed/Surfac e White Disk Light
Halo
# SLD606830W HC 7.75x1x7.75
Energy Star LEDD
$44.97/each
https://www.homedepot.ca/ en/home/p.6-inch-ledrecessedsurface-white$179.88 disk-light.1000762252.html
TOTAL FINISH COST = $8138.7 APPENDIX B - FINISH SCHEDULE FOR 3 TIERS OF FINISHES - TIER 3 FINISH (Tier 3) QTY
PRODUCT
NAME
PHOTO
7732-46 Profile 2300 25 Kitchen Kitchen Counter Countertop in Butterum Granite 1 Top Bellview 12-inch x 12-inch x 8 mm Ceramic Bathroom Floor Mosaic Tile in Sea Cliff 44 Tiles Bellview 12-inch x 12-inch x 8 mm Ceramic Bathroom Wall Mosaic Tile in Sea Cliff 100 Tiles Living, Kitchen, Bedroom, 669 Flooring APPLIANCE (Tier 3) QTY PRODUCT
1 Fridge
1 Stove Range
PRICE/UNIT
1 Dishwasher
22 cu. ft. French Door Refrigerator with Water Dispenser in Stainless Steel 5.8 cu. ft. SlideIn Gas Range with True Convection in Stainless Steel 24" Top Control Built-In Tall Tub Dishwasher in Slate with Steam Cleaning, 48 dBA
MODEL NO.
PHOTO
1198
DIMENSIONS
COLOUR/FINISH
PRICE
1/2-inch x 72inch
Butterum Granite
$125/each
Daltile
# BL0524HDMS 1L 12x12
Ceramic
$7.87/SQST
Daltile
# BL0524HDMS 1L 12x12
Ceramic
$7.87/SQST
Power Dekor
# 1L15X160/800 3CC 47.76x6.3
Oak Laminated Wood
$2.35 / sq. ft.
SOURCE https://www.homedepot.ca/ en/home/p.7732-46-profile2300-25-12-inch-x-72-inchkitchen-countertop-inbutterumgranite.1000169641.html $125/unit https://www.homedepot.ca/ en/home/p.bellview-12inch-x-12-inch-x-8-mmceramic-mosaic-tile-in-sea$346.28 cliff.1000669693.html https://www.homedepot.ca/ en/home/p.bellview-12inch-x-12-inch-x-8-mmceramic-mosaic-tile-in-sea$787 cliff.1000669693.html https://www.homedepot.ca/ en/home/p.15mm-palmettooak-laminate-flooring-1255sq-ft-$1,572.75 case.1001031778.html
MANUFACTURER
MODEL NO.
DIMENSIONS
COLOUR/FINISH
PRICE
PRICE/UNIT
LG
# LFD22786ST
22 cu. ft
Stainless Steel
$1498.00/each
Samsung
Model # NX58H9500W S 5.8 cu. ft
Stainless Steel
$1798.00/each
GE
Energy Star # Black Stainless PDT660SGFB B 24x33.45x23.75 Steel
$698.00 / each
Belanger Laminates Inc # 15230623
15mm Palmetto Oak Laminate Flooring (12.55 sq. ft. / case) NAME
MANUFACTURER
SCHEDULE
49
PRICE/UNIT
SOURCE https://www.homedepot.ca/ en/home/p.22-cu-ft-frenchdoor-refrigerator-withwater-dispenser-instainless$1,498 steel.1000795118.html https://www.homedepot.ca/ en/home/p.58-cu-ft-slide-ingas-range-with-trueconvection-in-stainless$1,798 steel.1000807595.html https://www.homedepot.ca/ en/home/p.24-top-controlbuilt-in-tall-tub-dishwasherin-slate-with-steamcleaning-48$698 dba.1000821040.html
APPENDIX B FINISH SCHEDULE TIER 3
Range Hood
30-inch, 500 CFM Canopy Wall-Mount Range Hood in Stainless Steel with Halogen Lighting
8.4 cu. ft. Gas Combination Washer - Dryer Combined Washer & Dryer in White FURNISHING (Tier 3) QTY PRODUCT NAME
Base Cabinet
Wall Cabinet PLUMBING (Tier 3) QTY PRODUCT
Toilet
San Diego Base Cabinet - 2 Doors - 36" White
NAME Santa Rosa 1piece 4.84 LPF Single Flush Elongated Bowl Toilet in White
Bathtub
Shower Head
In2ition 2-in-1 Showerhead with H2Okinetic Technology
Arda
# HAM52A760MM
Whirlpool
# WGT4027EW 32x71.25x27.25 Stainless Steel
$1,798.00 / each
MANUFACTURER
MODEL NO.
EBSU
30-Inch TwoDoor and ThreeShelf Wall Cabinet
Marquete Bathroom Sink Basin New Town 6032IFS White Acrylic Soaker Tub with Integrated Flange and Skirt with Left-Hand Drain
Sink
PHOTO
PHOTO
Energy Star Black Stainless Steel
APPENDIX B FINISH SCHEDULE TIER 3
TLB36-BLSD
19X53X30
$494.00/each
DIMENSIONS
COLOUR/FINISH
PRICE
36"
White Thermoplastic (MDF)
$219.00 / each
KUIZEN
White KUI-HD30492- 30" x 24 7/16" x Thermoplastic (MDF) 11 49 1/2"
$499.00/ each
MANUFACTURER
MODEL NO.
PRICE
DIMENSIONS
COLOUR/FINISH
KOHLER
# K-10491-0
27.75X28.19X1 Eco Option 8.75 Procelain
$339/each
American Standard
# 0642104.020
16.25x6.75x16. 25 Procelain
$108.00/each
MAAX
# 105456000-001-001
31.88X20.50X5 9.75 Procelain
Delta
50 # 75591
11.13x47.25
CSA Cerfitied Stainlesss Steel
$551.88/each
$119.00/each
https://www.homedepot.ca/ en/home/p.30-inch-500cfm-canopy-wall-mountrange-hood-in-stainlesssteel-with-halogen$494 lighting.1000749810.html https://www.homedepot.ca/ en/home/p.84-cu-ft-gascombination-washer--dryer-in$1,789 white.1000830142.html PRICE/UNIT
SOURCE
https://www.rona.ca/en/sandiego-base-cabinet-2$219.00 doors-36-white-75396275
https://www.bathdepot.ca/k $499.00 ui-hd30492-11.html SOURCE https://www.homedepot.ca/ en/home/p.santa-rosa-1piece-484-lpf-single-flushelongated-bowl-toilet-in$339 white.1000735332.html https://www.homedepot.ca/ en/home/p.marquetebathroom-sink$108 basin.1000756146.html
Kitchen Faucet
Kitchen Sink ACCESSORIES (Tier 3) QTY PRODUCT
Moen
# 87017SRS
9.63x9.94
Eco Option Stainless Steel
$169.00/each
https://www.homedepot.ca/ en/home/p.banburykitchen-faucet-withmatching-pullout-wand-inspot-resist-stainless$196 finish.1000535875.html https://www.homedepot.ca/ en/home/p.silgranit-naturalgranite-compositetopmount-kitchen-sink$378 truffle.1000713365.html
Blanco
# 401137
20.5x8
Stainless Steel
$378.00 / each
MANUFACTURER
MODEL NO.
DIMENSIONS
COLOUR/FINISH
PRICE
Toilet Paper Holder
NAME PHOTO New Town 6032IFS White Acrylic Soaker Tub with Integrated Flange and Skirt with Left-Hand Drain
Moen
# DN8408CH
2.37x2.25
Shower Rod
Minial Tension Rod - Chrome
Zenith Products
# 771SS
2.75x39.1x2.75 Chrome
$38.98/each
$38.98
Moen
# YB0486CH
3.3.x1.34
Chrome
$37.28/each
$37.28
# HD105476G-806Tangerine Mirror Co SS406-1
1x39x27
Glass
MANUFACTURER
MODEL NO.
DIMENSIONS
COLOUR/FINISH
PRICE
Halo
# SLD606830W HC 7.75x1x7.75
Energy Star LED
$44.97/each
Halo
# SLD606830W HC 7.75x1x7.75
Energy Star LEDD
$44.97/each
PRICE/UNIT
https://www.homedepot.ca/ en/home/p.new-town6032ifs-white-acrylicsoaker-tub-with-integratedflange-and-skirt-with-lefthand$551.88 drain.1000708150.html https://www.homedepot.ca/ en/home/p.in2ition-2-in-1showerhead-withh2okinetictechnology.1000850306.ht $119 ml
Banbury Kitchen Faucet with Matching Pullout Wand in Spot Resist Stainless Finish Silgranit, Natural Granite Composite Topmount Kitchen Sink, Truffle
Towel Bar
Mirror LIGHTING FIXTURES (Tier 3) QTY PRODUCT
2 Bathroom Light
4 Ceiling Light
Align Towel Ring In Chrome Milano, Mirror, Brown Gloss/ Silver hairline inlay - 18 Inch x 30 Inch NAME PHOTO 6 Inch LED Recessed/Surfac e White Disk Light 6 Inch LED Recessed/Surfac e White Disk Light
TOTAL FINISH COST = $11986.91
51
Stainless steel
$22.98/each
$99.97 / each
PRICE/UNIT
$22.98
$99.97 PRICE/UNIT
SOURCE
https://www.homedepot.ca/ en/home/p.preston-chromepaperholder.1000408770.html https://www.homedepot.ca/ en/home/p.minial-tensionrod--chrome.1000753726.html https://www.homedepot.ca/ en/home/p.align-towel-ringinchrome.1001043786.html https://www.homedepot.ca/ en/home/p.milano-mirrorbrown-gloss-silver-hairlineinlay---18-inch-x-30inch.1000707982.html
SOURCE https://www.homedepot.ca/ en/home/p.6-inch-ledrecessedsurface-white$89.94 disk-light.1000762252.html https://www.homedepot.ca/ en/home/p.6-inch-ledrecessedsurface-white$179.88 disk-light.1000762252.html
APPENDIX C LEED CHECK LIST
APPENDIX C TRIPLE BOTTOM LINE Integrative Project Planning and Design (Prerequisite)
LEED v4 for BD+C: New Construction and Major Renovation
Project Checklist Y
?
1
Total Points: 1 Intent: To emphasize human health by maximizing opportunities for integrated, cost effective adoption of green design and construction strategies through collaboration between experts.
999/1011 Wellingt St West
N Credit
12 0
Project Name: Date: 2017/12/5
Integrative Process
0 Location and Transportation
1 16
7
0
0 Materials and Resources
13
Prereq
Storage and Collection of Recyclables
Required
Y
Prereq
Construction and Demolition Waste Management Planning
Required
2
Credit
5
2
Credit
Access to Quality Transit
5
1
Credit
Building Life-Cycle Impact Reduction Building Product Disclosure and Optimization - Environmental Product Declarations Building Product Disclosure and Optimization - Sourcing of Raw Materials
Credit
Bicycle Facilities
1
1
Credit
0
Credit
Reduced Parking Footprint
1
1
Credit
1
Credit
Green Vehicles
1
Credit
LEED for Neighborhood Development Location
1
Credit
Sensitive Land Protection
1
0
Credit
High Priority Site
2
4
Credit
Surrounding Density and Diverse Uses
5
Credit
1
0
2
0
0 Sustainable Sites
16
10
Y
9
0
Y
Building Product Disclosure and Optimization - Material Ingredients Construction and Demolition Waste Management
0 Indoor Environmental Quality
5 2 2 2 2
16
Prereq
Minimum Indoor Air Quality Performance
Required
Y
Prereq
Construction Activity Pollution Prevention
Required
Y
Prereq
Environmental Tobacco Smoke Control
Required
1
Credit
Site Assessment
1
2
Credit
Enhanced Indoor Air Quality Strategies
2
1
Credit
Site Development - Protect or Restore Habitat
2
3
Credit
Low-Emitting Materials
3
0
Credit
Open Space
1
0
Credit
1
0
Credit
Rainwater Management
3
0
Credit
Construction Indoor Air Quality Management Plan Indoor Air Quality Assessment
0
Credit
Heat Island Reduction
2
1
Credit
Thermal Comfort
1
0
Credit
Light Pollution Reduction
1
2
Credit
Interior Lighting
2
0
Credit
Daylight
3
0
Credit
Quality Views
1
1
Credit
Acoustic Performance
1
8
0
0 Water Efficiency
11
Prereq
Outdoor Water Use Reduction
Required
Y
Prereq
Indoor Water Use Reduction
Required
Y
Prereq Credit
Building-Level Water Metering Outdoor Water Use Reduction
Required
1 4
Credit
Indoor Water Use Reduction
6
2
Credit
Cooling Tower Water Use
2
1
Credit
Water Metering
1
Y
22 0
0 Energy and Atmosphere
2
33
0
0
0 0
0
0
0
2
0 Innovation Credit
Innovation
Credit
LEED Accredited Professional
6 1
0 Regional Priority
4
Credit
Regional Priority: Specific Credit
0
Credit
Regional Priority: Specific Credit
1 1
Fundamental Commissioning and Verification
Required
0
Credit
Regional Priority: Specific Credit
1
Y
Prereq
Minimum Energy Performance
Required
0
Credit
Regional Priority: Specific Credit
1
Y
Prereq
Building-Level Energy Metering
Required
Y
Prereq
Fundamental Refrigerant Management
Required
6
Credit
Enhanced Commissioning
6
12
Credit
Optimize Energy Performance
18
1
Credit
Advanced Energy Metering
1
2
Credit
Demand Response
2
0
Credit
Renewable Energy Production
3
1
Credit
Enhanced Refrigerant Management
1
0
Credit
Green Power and Carbon Offsets
2
61
0
0 TOTALS
People: To ensure a healthy and sustainable living environment for the residents through analyzing the urban environment of the site at the pre-design stage.
Planet: To minimize the carbon footprint of the new construction and to reduce the energy required for operating the building. Targeting sustainable strategies before starting schematic design and conducting a preliminary LEED meeting with the project team members and owners. Performing a preliminary energy model analysis before the completion of schematic design and develop strategies in reducing energy loads of the building.
Profit: To develop a cost-effective, sustainable and feasible design with the design team members. The goal is to integrate green strategies across all aspects of building design, construction, operation, maintenance and disposal.
Location and Transportation
5
Prereq
Y
Process: Preparing an ownerâ&#x20AC;&#x2122;s project requirements document, establishment of preliminary rating goals, integrated project team and completion of a design charrette.
Possible Points:
Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110
110
Total Points: 18 1) Sensitive Land Protection (1 point) a) The development footprint on land has been previously developed 2) Surrounding Density and Diverse Uses (3 points) a) The project is located in a high-density area with various mixed use buildings that provide a lot of daily services. According to the secondary plan, the density will continue increasing. 3) Access to Quality Transit (3 points) a) 38 different bus services and 1 light rail station are provided within 800m radius.
52
4) Bike Facilities (1 point) a) Long term and short-term bike storage is provided for more than 30% of all the building occupants within 30m walking distance to the main entrance.
53
APPENDIX C TRIPLE BOTTOM LINE
APPENDIX C TRIPLE BOTTOM LINE Water Efficiency
People: To locate the building in a neighborhood with various public transit routes. Taking advantages of existing linkages and amenities in the community, encouraging a healthy and sustainable living style for the residents through developing the walkability of the area.
Planet: To reduce the carbon emissions generated by automobiles by locating the project in an area with diverse uses and various public transit routes to promote a walkable community and decrease automobile usage.
Profit: To reduce the cost on infrastructure needed for new development by locating the project in a dense area in addition to allowing residence to save money by using alternative means of transportation.
Total Points: 8 1) Outdoor Water Reduction (Prerequisite) 2) Indoor Water Use Reduction (Prerequisite) 3) Building Level Water Metering (Prerequisite) 4) Outdoor Water Reduction (1 point) a) Reduce outdoor water usage through native plants with efficient irrigation systems that improve outdoor water usage by 50% as compared to the base standard. 5) Indoor Water Reduction (4 points) a) Choosing energy star rated appliances to reduce indoor water usage by 40%.
Sustainable Sites
6) Cooling Water Tower Use (2 points) a) Conserve water used for cooling tower make up when controlling microbes, corrosion and scale in the condenser water system.
Total Points: 1 1) Site Assessment (1 point) a) Assess site conditions and evaluate sustainable options to inform decision about site design.
7) Water Metering (1 point) a) Install permanent water meter for irrigation, indoor plumbing fixtures and fittings, and annual water usage.
2) Site Development â&#x20AC;&#x201C; Protect or Restore Habitat (1 point) a) 30% of the site designated to landscape using native plants in order to provide habitat and promote biodiversity on the site.
People: To emphasize a healthy living environment through analyzing site conditions; such as topography, hydrology, climate, vegetation, soil, human use and human health effects.
Planet: To protect habitat and promote biodiversity through restoring 30% of the site to landscape or green space.
54
Profit: To plant native vegetation that can reduce maintenance costs and costs for irrigation, while also providing an enjoyable and healthy space for the residents.
People: To conserve freshwater for future generations using efficient equipment and installing a water meter to monitor the water usage of the building for future improvement.
Planet: To conserve freshwater by incorporating water efficiency strategies in order to reduce total water usage during the operation. Low flow fixtures can be installed to reduce indoor water usage while native plants help in reducing the outdoor water usage. The water usage should be monitored for future development.
55
Profit: Applying water efficiency strategies by installing efficient fixtures and equipment to reduce the cost for total water usage. In addition, people tend to choose to live in buildings that contribute to energy conservation.
APPENDIX C TRIPLE BOTTOM LINE
APPENDIX C TRIPLE BOTTOM LINE
Energy and Atmosphere
Material and Resources
Total Points: 22 1) Fundamental Commissioning and Verification (Prerequisite) 2) Minimum Energy Performance (Prerequisite) 3) Building Level Energy Metering (Prerequisite)
Total points: 7 1) Storage and Collections of Recyclables (Prerequisite) 2) Construction and Demolition Waste Management Planning (Prerequisite)
4) Enhanced Commissioning (6 points) a) To support the design, construction and eventual operation of the project that meets the owner’s requirements for energy, water, indoor environmental quality and durability.
3) Building Life Cycle Impact Reduction (2 points) a) 25% of materials are reused for interior elements and structure elements. A life-cycle assessment of the materials for the project’s structure is conducted to reduce greenhouse gases, ozone depletion and acidification of land and water sources.
5) Optimize Energy Performance (12 points) a) Conduct a whole building energy simulation and improve energy efficiency by 30%.
4) Building Product Disclosure and Optimization – Environmental Product Declarations (2 points) a) Use materials with life-cycle information.
6) Advance Energy Metering (1 point) a) Monitoring the energy usage through installing energy meters permanently.
5) Building Product Disclosure and Optimization – Sourcing of Raw Materials (1 point) a) Choose materials from manufacturers that release reports from their raw material suppliers. In this project, cross laminated timber is used as the primary building material.
7) Demand Response (2 points) a) Installing sensors to increase participation in demand response technologies to reduce carbon footprint through improving energy generation and distribution system. 8) Enhanced Refrigerant Management (1 point) a) Using non-ozone depleting refrigerants to reduce ozone depletion.
People: To promote energy efficiency and still provide a comfortable living space for the residents. Energy meters are installed in the building to ensure energy efficiency of the building and monitor the energy usage for the further improvement. Non-ozone depleting refrigerants are used in the building.
Planet: To minimize the greenhouse gas emissions through incorporating energy efficient strategies and ensuring an efficient operation.
56
6) Building Product Disclosure and Optimization – Material Ingredients (1 point) a) Choose building materials with manufacturer inventory that contain all ingredients identified by name and chemical abstract service registration number. 7) Construction and Demolition Waste Management a) Reduce construction and demolition waste disposed to landfill.
Profit: To develop a sustainable and energy efficient building that can significantly reduce the energy cost during the entire operation stage of the building.
People: To promote and implement thoughts of environmental sustainability by reusing materials.
Planet: To minimize the carbon footprint and amount of waste generated by construction through the reuse of existing building materials.
57
Profit: Reduce the cost of using new materials by reusing existing materials.
APPENDIX C TRIPLE BOTTOM LINE
APPENDIX D Land titleS PARCEL REGISTER (ABBREVIATED) FOR PROPERTY IDENTIFIER LAND PAGE 1 OF 2 PREPARED FOR H REGISTRY ON 2017/10/13 AT 13:13:44 OFFICE #4 04095-0182 (LT) * CERTIFIED IN ACCORDANCE WITH THE LAND TITLES ACT * SUBJECT TO RESERVATIONS IN CROWN GRANT *
Indoor Environmental Quality Total points: 9 1) Minimum Indoor Air Quality Performance (Prerequisite) 2) Environmental Tobacco Smoke Control (Prerequisite) 3) Enhance Indoor Air Quality Strategies (2 points) a) Provide a comfortable and healthy living space through mechanical and natural ventilation strategies.
PROPERTY DESCRIPTION:
LT 20 & PT LT 21, PL 57 , AS IN N556946, S/T & T/W N556946 ; OTTAWA/NEPEAN
PROPERTY REMARKS: ESTATE/QUALIFIER: FEE SIMPLE LT CONVERSION QUALIFIED
RECENTLY: FIRST CONVERSION FROM BOOK 82
OWNERS' NAMES SAIKALEY, PHILIP SAIKALEY, NAJAT
CAPACITY JTEN JTEN
REG. NUM.
DATE
INSTRUMENT TYPE
PIN CREATION DATE: 1996/06/24
SHARE
AMOUNT
PARTIES FROM
PARTIES TO
**EFFECTIVE 2000/07/29 THE NOTATION OF THE "BLOCK IMPLEMENTATION DATE" OF 1996/06/24 ON THIS PIN**
4) Low Emitting Materials (3 points) a) Test the VOC emission indoors and choose low VOC materials.
**WAS REPLACED WITH THE "PIN CREATION DATE" OF 1996/06/24** ** PRINTOUT INCLUDES ALL DOCUMENT TYPES AND DELETED INSTRUMENTS SINCE 1996/06/21 ** **SUBJECT, ON FIRST REGISTRATION UNDER THE LAND TITLES ACT, TO:
5) Thermal Comfort (1 point) a) Design the HVAC system and building envelope to meet the requirements of ASHRAE Standard 55-2010. 6) Interior Lighting (2 points) a) Provide lighting control for at least 90% of individual occupant spaces and to make sure that the light fixture has maximum luminance of 2500cd/m2 7) Acoustic Performance (1 point) a) To provide a quiet living space through reducing the noise that comes from HVAC and install acoustical finishes.
People: To ensure a comfortable and healthy living environment through selecting low VOC content materials for interior finishes, installing enough lighting fixtures for individual occupant spaces and providing thermal controls per unit for the residents.
Planet: To install controls for lighting, thermal and electrical for a more energy efficient design.
58
**
SUBSECTION 44(1) OF THE LAND TITLES ACT, EXCEPT PARAGRAPH 11, PARAGRAPH 14, PROVINCIAL SUCCESSION DUTIES
**
AND ESCHEATS OR FORFEITURE TO THE CROWN.
**
THE RIGHTS OF ANY PERSON WHO WOULD, BUT FOR THE LAND TITLES ACT, BE ENTITLED TO THE LAND OR ANY PART OF
**
IT THROUGH LENGTH OF ADVERSE POSSESSION, PRESCRIPTION, MISDESCRIPTION OR BOUNDARIES SETTLED BY
**
CONVENTION.
**
ANY LEASE TO WHICH THE SUBSECTION 70(2) OF THE REGISTRY ACT APPLIES.
*
**DATE OF CONVERSION TO LAND TITLES: 1996/06/24 ** N556946
1990/11/15
TRANSFER
*** COMPLETELY DELETED ***
N556947
1990/11/15
CHARGE
*** COMPLETELY DELETED ***
LT1016138
1996/12/11
APL (GENERAL)
*** COMPLETELY DELETED *** MASTROMATTEI HOLDINGS LIMITED
LT1016139
1996/12/11
CHARGE
*** COMPLETELY DELETED *** MASTROMATTEI HOLDINGS LIMITED
LT1121624
1998/05/19
CHARGE
*** COMPLETELY DELETED *** MASTROMATTEI HOLDINGS LIMITED
746666 ONTARIO LTD. NATIONAL TRUST COMPANY
NATIONAL TRUST COMPANY
MASTROMATTEI, GIOVANNI MASTROMATTEI, ASSUNTA NOTE: ADJOINING PROPERTIES SHOULD BE INVESTIGATED TO ASCERTAIN DESCRIPTIVE INCONSISTENCIES, IF ANY, WITH DESCRIPTION REPRESENTED FOR THIS PROPERTY. NOTE: ENSURE THAT YOUR PRINTOUT STATES THE TOTAL NUMBER OF PAGES AND THAT YOU HAVE PICKED THEM ALL UP.
Profit: To reduce operations costs by installing lighting and thermal controls to lessen unwanted heating and lighting. A building energy simulation model can help determine the baseline of the energy usage.
59
CERT/ CHKD
APPENDIX D Land titleS
APPENDIX E ALTERNATE FINANCING STRUCTURE
PARCEL REGISTER (ABBREVIATED) FOR PROPERTY IDENTIFIER
LAND
REGISTRY OFFICE #4
PAGE 1 OF 2
04095-0184 (LT)
* CERTIFIED IN ACCORDANCE WITH THE LAND TITLES ACT * SUBJECT TO RESERVATIONS IN CROWN GRANT *
PROPERTY DESCRIPTION:
PREPARED FOR H ON 2017/10/13 AT 13:15:05
LT 22 & PT LT 24, PL 57 , AS IN CR619228 ; OTTAWA/NEPEAN
PROPERTY REMARKS: ESTATE/QUALIFIER: FEE SIMPLE LT CONVERSION QUALIFIED
RECENTLY: FIRST CONVERSION FROM BOOK 82
OWNERS' NAMES 1427405 ONTARIO LIMITED
CAPACITY BENO
Alternative Alternative Financial Financial Summary Summary
PIN CREATION DATE: 1996/06/24
Alternative Alternative Financial Financial Summary Summary
Average Average SellingSelling Price PSF Price PSF $537.00 $537.00
Average Average SellingSelling Price PSF Price PSF $537.00 $537.00
% Equity % Equity
30.00%30.00%
% Equity % Equity
22.50%22.50%
Net Revenues Net Revenues
$28,687,560.00 $28,687,560.00
Net Revenues Net Revenues
$28,687,560.00 $28,687,560.00
Expenses Expenses
$24,066,277.15 $24,066,277.15
Expenses Expenses
$24,066,277.15 $24,066,277.15
**EFFECTIVE 2000/07/29 THE NOTATION OF THE "BLOCK IMPLEMENTATION DATE" OF 1996/06/24 ON THIS PIN**
Profit Profit
$4,621,282.85 $4,621,282.85
Profit Profit
$4,621,282.85 $4,621,282.85
**WAS REPLACED WITH THE "PIN CREATION DATE" OF 1996/06/24**
Profit Per Profit Door Per Door
$77,021.38 $77,021.38
Profit Per Profit Door Per Door
$77,021.38 $77,021.38
Cash on Cash Cash onReturn Cash Return 64.01%64.01%
EquityEquity Required Required
$5,414,912.36 $5,414,912.36
EquityEquity Required Required
$7,219,883.15 $7,219,883.15
Cash on Cash Cash onReturn Cash Return 85.34%85.34%
Bank Loan Bank Loan
$16,846,394.01 $16,846,394.01
Bank Loan Bank Loan
$18,651,364.79 $18,651,364.79
% LTC % (Debt) LTC (Debt)
70.00%70.00%
% LTC % (Debt) LTC (Debt)
77.50%77.50%
REG. NUM.
DATE
INSTRUMENT TYPE
SHARE
AMOUNT
PARTIES FROM
CERT/ CHKD
PARTIES TO
** PRINTOUT INCLUDES ALL DOCUMENT TYPES AND DELETED INSTRUMENTS SINCE 1996/06/21 ** **SUBJECT, ON FIRST REGISTRATION UNDER THE LAND TITLES ACT, TO: **
SUBSECTION 44(1) OF THE LAND TITLES ACT, EXCEPT PARAGRAPH 11, PARAGRAPH 14, PROVINCIAL SUCCESSION DUTIES
**
AND ESCHEATS OR FORFEITURE TO THE CROWN.
**
THE RIGHTS OF ANY PERSON WHO WOULD, BUT FOR THE LAND TITLES ACT, BE ENTITLED TO THE LAND OR ANY PART OF
**
IT THROUGH LENGTH OF ADVERSE POSSESSION, PRESCRIPTION, MISDESCRIPTION OR BOUNDARIES SETTLED BY
**
CONVENTION.
**
ANY LEASE TO WHICH THE SUBSECTION 70(2) OF THE REGISTRY ACT APPLIES.
*
Alternative Alternative Financial Financial Summary Summary
**DATE OF CONVERSION TO LAND TITLES: 1996/06/24 ** CR619228
1972/09/29
TRANSFER
NS171653
1982/12/06
AGREEMENT
LT1339379
2000/11/17
TRANSMISSION-LAND
*** COMPLETELY DELETED ***
KARDISH, ISRAEL THE CORPORATION OF THE CITY OF OTTAWA
*** COMPLETELY DELETED *** KARDISH, ISRAEL - DECEASED
KARDISH, KARDISH, KARDISH, KARDISH,
REMARKS: ALL DEBTS OF THE ESTATE HAVE BEEN PAID. LT1339380
2000/11/17
TRANSFER
$65,000
KARDISH, ISRAEL - ESTATE KARDISH, DAVID KARDISH, HARVEY
C
ISRAEL - ESTATE DAVID HARVEY VICTOR
1427405 ONTARIO LIMITED
C
Alternative Alternative Financial Financial Summary Summary
Average Average SellingSelling Price PSF Price PSF $537.00 $537.00
Average Average SellingSelling Price PSF Price PSF $537.00 $537.00
% Equity % Equity
25.00%25.00%
% Equity % Equity
20.00%20.00%
Net Revenues Net Revenues
$28,687,560.00 $28,687,560.00
Net Revenues Net Revenues
$28,687,560.00 $28,687,560.00
Expenses Expenses
$24,066,277.15 $24,066,277.15
Expenses Expenses
$24,066,277.15 $24,066,277.15
Profit Profit
$4,621,282.85 $4,621,282.85
Profit Profit
$4,621,282.85 $4,621,282.85
Profit Per Profit Door Per Door
$77,021.38 $77,021.38
Profit Per Profit Door Per Door
$77,021.38 $77,021.38
EquityEquity Required Required
$6,016,569.29 $6,016,569.29
EquityEquity Required Required
$4,813,255.43 $4,813,255.43
Cash on Cash Cash onReturn Cash Return 76.81%76.81%
Cash on Cash Cash onReturn Cash Return 96.01%96.01%
Bank Loan Bank Loan
$18,049,707.86 $18,049,707.86
Bank Loan Bank Loan
$19,253,021.72 $19,253,021.72
% LTC % (Debt) LTC (Debt)
75.00%75.00%
% LTC % (Debt) LTC (Debt)
80.00%80.00%
NOTE: ADJOINING PROPERTIES SHOULD BE INVESTIGATED TO ASCERTAIN DESCRIPTIVE INCONSISTENCIES, IF ANY, WITH DESCRIPTION REPRESENTED FOR THIS PROPERTY. NOTE: ENSURE THAT YOUR PRINTOUT STATES THE TOTAL NUMBER OF PAGES AND THAT YOU HAVE PICKED THEM ALL UP.
60
61
APPENDIX F J. Chung
M. Cordeiro
Model Develpment Brief Planning Rationale Site Plan Design Package Development Financial Summary Land Acquisition Professional Service Fee Permits and Development Charge Marketing & Sales Construction Financing Tarion LEED Revenue Summary Unit Pricing Sheet Tarion Entrollment Breakdown Cash Flow Projections Project Schedule GO/NO GO criteria Financing summary & Loan Amortization Finish Schedule LEED Check List and Triple Bottom Line Alternative Financing Structure Layout
62
S. Duong
Y. Wei
999 & 1011 WELLINGTON STREET WEST