Jiayun Li.Yuchen Ye 617171.633991
Progressive Model Photographs
WEEK5 Site plan, soil, trench, foundation.
NON-TEACHING WEEK Water proof membrane, pad footing, bored piers, ground floor concrete slab+beam.
Ground floor wall structure, concrete panel wall and window framing.
WEEK 6 Ground floor joinery, first floor slab, first floor framing and partial wall cladding.
Final Model by Week 7