YICHEN LU surface & texture
p
ortfolio 2006 - 2012
Universität Für Angewandte kunst Wien| 10.2005 ~ 2.2012
Tirana, Albania parliament competition, 1st prize 1:100 Mocape Shenzhen fasade structure working model
Bachelor degree of Science - Geography
Rainer Pirker ArchiteXture | 7.2008 ~ 9.2008 Vienna,Austria/Shenzhen,China
National Taiwan University, Taipei, Taiwan | 10.1999 ~ 6.2003
International competition South China University of Science and Technology, 2nd prize 5 weeks working in a group in Shenzhen, China, and making proposals from the scale of campus. From master planning to architecture design; as well as concerning about the student life and the interacting between the school and the local community.
* born in Taipei, Taiwan, 01.11.1981
CV
Yichen Lu Tel :+ 43 664 5809050 Email :lulutaipei@mac.com Address :parkgasse 8/ 14 - 15, 1030, Vienna, Austria
planning
bsc
1:200 Tirana, Albania parliament competition model
Laboratory of Environmental& Form (LEF) Taipei, Taiwan | 8.2004 ~ 7.2005
computer program
Coop Himmelb(l)au | 2.2011 ~ 4.2011 Vienna,Austria
_AUTO CAD _MAYA _RHINO + GRASSHOPPER MODELING _MENTALRAY(basic) _ADOBE PHOTOSHOP/ ILLUSTRATOR/INDESIGN/AFTEREFFECT
fabrication
Magistra der Architektur studio Wolf D. Prix and diploma with Hani Rashid
|Skills
_LASER CUTTING _3D-PRINTING _CNC Milling
language
|Working Experience architecture
mag.arch
|Education
_MANDARIN (ORAL AND WRITTEN) _PROFICIENT IN ENGLISH (ORAL AND WRITTEN)
Designed a concept for the Plateform of the historic Chul‐Chen railway station in Taiwan. Worked in a team for making the proposal of the east village Townscape renovation project.
National Taiwan University Building and Planning Research Foundation Taipei, Taiwan | 6.2003 ~ 7.2004 Community Planning Project in Matsu: Designed and organized traditional wedding festival to revitalizing old villages.
Y
ICHEN LU
|Research & Diploma
YICHEN
p
ortfolio 2006 - 2012
#01Diploma project
10.2011-2.2012 diploma with Hani Rashid
Social condenser - Favela montage
The concept for this project is dealing primarily with a favela neighborhood close to the center of the city of Sao Paulo in Brazil. The specific site was choosen through an analytic process of producing a series of mappings of existing path configurations, population flux, density distribution, hydrology and morphological studies present in the existing ever changing favela. The specific site for this architecture is situated at top an sunken basin facing sever issues associated with issues of human mobility and flooding. The Project loos at the making of a new configuration based on existing and anticipated urban flows, metamorphosis and new situations of growth and change to the fabric of the Favela. The architectural studies and work proposed are being created by intersecting two layers of artificial landscapes across the existing basin, as well as integrating predetermined pathways and systems incorporating new aspects and modalities of circulation and flow. The resulting architecture celebrates the notion of an urban void to be filled with program and people forming a new morphology made up of social fields and thereby improving and enhancing the existing and new neighborhoods it will invariably impact.
site plan
YICHEN
p site, exsisting favela situation
conceptual illustration-layering
ortfolio 2006 - 2012
original site situation
conceptual idea - lift the flooded houses
conceptual idea - replacement
Diploma project
Social condenser - Favela montage
conceptual illustration - mobility implatation
site analysis mapping exsisting building on landscape
site analysis mapping hydrological analysis
site analysis mapping slope analysis
YICHEN YICH
p
ortfolio ortfo 2006 - 2012
YICHEN
p
ortfolio 2006 - 2012
flow simulation
circulation
massing
opitimization voronoi structure according to surface curvature
YICHEN
p
ortfolio 2006 - 2012
1:200 physical model 150cm * 120cm YICHEN
p
ortfolio 2006 - 2012
#02Research Project
representation of endless house / Friedrich Kiesler
kiesler - physical model
perfomance comparison
3.2010-6.2010, group project to compare the generic and the triangulated model, the material load, the dead load and the life load
structure system-triangulation model
structure design
structure system-generic model
loads
deformation
YICHEN
view
p
ortfolio 2006 - 2012
GRUNDRISS
STEEL 19/9 METAL SHEET +- 0,00
+- 0,00
2 FLOORING 7 SCREED 8 INSULATION 0,3 FOIL 50 RC 20 GRAVEL
40/20
METAL SHEET
SECTION A-B
GRAVEL
GLASS DOOR
STEEL 5/5 COMPOSITE PANEL:
A
0,1 METAL SHEET 2-7 INSULATION 0,1 METAL SHEET
STEEL 12/6
STRUCTURAL GLAZING B
YICHEN
p
ortfolio 2006 - 2012
|Texture
YICHEN
p
ortfolio 2006 - 2012
#03Taipei Pop Music Center open air accoustic roof
Based on climate analysis, the 6000 people pop music concerthall pervide open air circulation to cool down the inner space. By distrubute the speaker and the movement of the sound reflecter, the accoustic issue could be solved.
10.2009-1.2010
winter wind_cold air circulation sound intensity transition YICHEN
p summer wind_air circulation and ventilation
ortfolio 2006 - 2012
shadow simulation for four season
6
7
8
urban view
YICHEN
p urban view
ortfolio 2006 - 2012
#04Community Design street transformation
10.2009-6.2010
der 15. Bezirk Spielplatz, ReinDorf Strasse In a multi-cultural environment, the goal is to create a distributed public spaces, a polycentric network in the neighborhood, in order to minimizing the confrontation that occurs in bigger, shared playgrounds. Centered around children who are the roles of least resistance to merging and communication. Playgrounds are conceived of many small playgrounds displayed according to the demand along the urban fabric.
YICHEN
p reindorf strasse, 15distrcct vienna
site survey
conceptual rendering
ortfolio 2006 - 2012
Soften the street, melt the boundary; there is no line betweens pedestrian and moto way; there is no sign to tell you what to do. The street is playground.
YICHEN
p
ortfolio 2006 - 2012
#05New Taipei City Museum of Art an alluvial landscape
08.2011
A
circulation and floor composition
circulation
program
volume skin study_solar radiation
Instead of a static exhibition, Yingge comtemperary museum of art is dynamic space sequences.A system of circulation is designed as public space which is like semi outdoor corridors moving around or cutting through exhibition spaces. 利用坡道與樓層的安排產生一系列高高低低,富有流動性的空間序列.利用 流動的概念,暗喻當代美術館應該化靜態的展覽為動態活動場域並能轉化 所在的地方成為人群與創意的發生地.美術館的動線為一序列的公共空間 同時也是半戶外廊道圍繞或是切開各個展覽空間,提供休憩與瞭望自然與 城市景觀的空間
skin study_opening
YICHEN
p
ortfolio 2006 - 2012
|Surface
YICHEN
p
ortfolio 2006 - 2012
#01
Fluid Dynamic in the RESPONSE OF CRISIS power rise / Vienna, Austria
2009
wind and skin simulation
YICHEN
p
ortfolio 2006 - 2012
#02 Fluid Dynamic2008 ocean research center
YICHEN
p
ortfolio 2006 - 2012
#03
Cliff House fictional site 2007
YICHEN
p
ortfolio 2006 - 2012
roof geomatry
section model series
#04
Roof Extention _ part 1 A Conversation with OSCAR NIEMEYER
YICHEN
2007
p
ortfolio 2006 - 2012
#05
Roof Extention_part 2 a Conversation with OSCAR NIEMEYER
The roof is a not only a sculpture, but a respond to the environment. This is a process setup for transitting the roof from a graphic pattern into (3 dimensional) inhabitable typology. Instead of having chemocline between basement and ground floor, building and landscape, the continuous chain reaction dissolves the confines of vertical movement in the original building.
2007
The reaction settings come from the adaptation of the roof geometry. By giving the geometry an idea of nature forces continuously impact on the site, the new reborn responds to the surroundings, seamlessly imbedded in the environment and smoothly articulate in itself. The ambulant sunlight, the fluent nature trails would lead us percept the space.
YICHEN
p
ortfolio 2006 - 2012
|masterplan International competition south china university of science and technology,2nd prize, 2008
YICHEN
p
ortfolio 2006 - 2012
site analysis
YICHEN
strategies
p
ortfolio 2006 - 2012
model work samples
1,2,3 MOCAPE 1:100 fasade model
coop himmelb(l)au
4,8 south china university of science and technology
Rainer Pirker architeXture 5-9 exhibition model
Rainer Pirker architeXture
1
5
4
6
7 2 YICHEN
8 3
9
p 10
ortfolio 2006 - 2012
model work samples Tirana, Albania parliament competition,1st prize
coop himmelb(l)au,02,2011
YICHEN
p
ortfolio 2006 - 2012