YingLin_Portfolio

Page 1



DESIGN DESIGN DESIGN DESIGN

// ACTION HOUSING : FALL 2012

// PREFORMANCE CENTER : SPRING 2011

// ENVIRONMENTAL SCHOOL : FALL 2011

LUNAR GALA : SPRING 2012

C3 : FALL 2012

C3 COMMUNITY ROOM: FALL 2012

C3 : MOBILE LAB: FALL 2012

//

PLYWOOD : SPRING 2011

//

// MARKET HALL : SPRING 2012

//

DESIGN & EXPLORE DESIGN & BUILD

//

//

DESIGN & MARKETING DESIGN & BUILD DESIGN & BUILD


TRADE INSTITUTE

EQUIP


C3

POINT BREEZE// PITTSBURGH,PA This project is in collaboration with Professor John Folan and students: Sandra Kalayan, Emily Punaty, Kyle Woltersdorf, Noelle White, Karno Widjaja, and Dan Quaintance. The Urban Design Build Studio is a comprehensive studio that allows for the collaboration between students, professors, community members and organizations, municipal groups, contractors, and granting foundations; all working towards making socially-conscious urban architectural interventions for the betterment of the communities in which they are built.

The C3 workshop is housed in the Construction Junction warehouse connected to an existing retail space. What is being added is a storefront entrance, a community room, flex room, andYing an upper level design studio. In addition, a mobile digital Lin fabrication lab funded by Ford Motor is being built.

4

YEAR

HUB

COMMUNITY ROOM

UP

GALLERY

ENTRANCE

// COMMUNITY ROOM : FALL 2012 - ?

PMENT & ASSEMBLY

DESIGN & BUILD

The focus of the Fall and Spring term is the design and execution of the C3: Community, Construction, and Cooperative. The C3 is about the social, educational, and business collaboration between Urban Design Build Studio, The Trade Institute of Pittsburgh, and Construction Junction.


C3: COMMUNITY ROOM POINT BREEZE// PITTSBURGH,PA

The C3: Community Construction Cooperative looks to serve the needs of the community in a self-sustaining venture which brings together people from all backgrounds to create opportunities where they have never existed before. Integrating the unique talents of the Urban Design Build Studio, Trade Institute of Pittsburgh, and Construction Junction will fuel innovation through collaborative efforts. The design is focused around public and private utility depending on the programs and entities which are using the space at the time. The centerpiece of the warehouse retrofit is the community room where a wide variety of activities are possible to take place. The flexible floor plan allows for formal conference meetings, casual discussions between shoppers, and everything in between. The two main modular walls of the community room open up into the production space and wood shop area to allow for demonstrations or large public gatherings. The construction of the Community will be done both with high-tech (digital fabrication) and low-tech (traditional construction) equipment.


DESIGN & BUILD

// COMMUNITY ROOM : FALL 2012 - ?


H2

H1

G1

H4 H3

H5

H10 H7

H9

H12 H11

H14 H13

H16 H15

H18 H17

DD67 DD66

H23

DD3

G6 G4

G8 G5

G7

G10 G9

G12 G11

G14 G13

G16 G15

G18 G17

G20 G19

G22 G21

DD4 DD6 DD7DD8 DD10 DD9 DD12 DD11 DD14 DD13 DD16 DD15 DD18 DD17 DD20 DD19

G24 G23

L16

DD30 DD29

DD28 DD27

DD26 DD25

DD24 DD23

DD22 DD21

DD28 DD27

DD26 DD25

DD24 DD23

DD22 DD21

L15 L14

DD83 DD82

DD81 DD80

DD79 DD78

DD77 DD76

DD75 DD74

DD73 DD72

DD71 DD70

DD69 DD68

DD2

DD1

DD5

G3 G2

H6

H8

H24

H22 H21

H20 H19

DD47 DD46 DD49 DD48 DD51 DD50 DD53 DD52 DD55 DD54 DD57 DD56 DD59 DD58 DD61 DD60 DD63 DD62 DD65 DD64

L12 L11

L13

L8

L10 L7

L9

L4

L6 L3

L5 L2 L1

F2

E2

E1

E8

E6

E4

E17

E15

E13

E11

E9

E7

E5

E3

E12

E10

F21

E19

E21

F23

E31

E25

E23

K29 K27

K3

K5

K4 BB1

BB10

BB18

BB26

BB34

BB2

K6 K2

BB11

K1

BB19

BB27

BB57

BB49

BB41

BB33

BB25

BB17

BB9

BB42

BB35

BB50

BB58

BB43

BB51

BB3 BB44 BB12

BB20

BB28

BB101

BB93

BB109

BB117

BB111

BB59

BB122

BB102

BB94

BB76

BB68

BB60

BB52

B

BB118

BB121

BB115

B

BB125

BB117

BB120

BB114

BB108

BB100

BB132

BB124

BB116

BB119

BB113

BB107

K10

K9

K8

K7

K15

K14

K13

K17

K20

K19

K18

K12

E33

E29

E27

K25

K21

K11

F31

F29

E30

E28

E26

K23

K16

E34

E32 F27

F25

E24

E22

E20

E18

E16

E14

F19

F17

F15

F13

F11

F9

F7

F5

F3

F1

F14

F12

F10

F8

F6

F4

F20

F18

F16

F32

F30

F28

F26

F24

F22

BB36

BB4

M14

M12 M11

M13

J18 J15

J17

J12

J14

J16

D15

D16

D13

D14

J9 D11

D12

D9

D10

J6

D7

D8

D3

D4 D2

C15

C14

J8

J10

D5

D6

C16

J13

J11

J5 D1

J7

J3 J4

C13

J2

C11

C10

C9

C8

J1

C7

C8

C5

C6

C3

C4 C2

C1

B7 B3 B1

A7

A5 A6 A4

B6

B8

B11 B10

A10

B13 B12

A15 A14

A12

A8 I21

A2 I17

I13

I9

I5

I1

B15 B14

B16

A17

A13

A11

A9

B2 A3

A1

B5 B4

B9

A16


DD93 DD92

DD91 DD90

DD89 DD88

DD87 DD86

DD85 DD84

DD31

DD45 DD44

DD43 DD42

DD41 DD40

DD39 DD38

DD37 DD36

DD35 DD34

DD33 DD32

CC1

U1 S1 Q1 Q4

W1 Q8

W2 W3

U2

Q12

U5

S2

Q15 Q2 Q5

W4

U5

Q18

W5

Q19

W6

Q9

W7

Q13 U6

Q16

BB155

BB147

BB139

U6 Q14

BB149

BB127

BB135

BB142

U4

Q7

U7

T1

V3 T3

R3 T9

R5 R11

T17 R9

R21

R17

R23

T25 R19 R27

R33

M10

R35

M9 R41

R37

R43

R39

V23 V33 T23

O4

V31

T41 V31 V43

T43

V39

T41 T39

T43 V45

R49 T43 O5

O6

O7

O8

O6

O11 O12

T57

T45 V49 T57 T47 T59

T49 T59

O10

O15 O17

V47 V51 V53

T51

V55

V53

V61

O21 O23 O25 O18

O13 O14

N14 N13 N12

N16 N15

N17

N19

N22 N21

N3

N1

B18

I24

A18 M1M2

I23 I20

I22

I19

I18 I15 I14

I16

I12 I11

I10 I7

I8

I6 I3 I2

N25

N6 N5

N18 N27

N8 N7

V63

T61 T63 O31 O35 O42 O27 O48 O32 O55 O38 O63 O45 O70 O51 O77 O28 O60 O84 O66 O39 O91 O74 O98 O80 O52 O88 O33 O67 O94 O46 O99 O81 O29 O61 O95 O40 O75 O53 O89 O34 O68 O47 O100 O30 O82 O62 O41 O96 O76 O54 N10 N11 O90 N9 O69 O101 O83 O97

M5

M3

N24 N23

N4

N2

M6

M4

N20

N26

I4

AA2

X6 X10 X14 X18

X25

X22

X29

X26

X33

X30

X37

X34

X41

X38

X45

X42

Y9

Y13

X7 X11 X15 X19 X23

X4 X8

X31

Z21

Y16

Z26

X24

X46

X32

X53 X50 X54 X57 X58 X61 X62 X65 X66 X69 X70 X73 X74 X77 X78 X81 X82

X43

X36

X47

X40

X51

X44 X48 X55

X59

X52 X56

X63

X60

X67

X64

X71

X68

X75

X72

X79

X76

X83

X80

Y18

AA20

AA8 Z11

Z15

Z20

Y8 Y10 Z24 Y12 Z25 Y14

X28

AA19

Z14

X16

X39

Z6 Z10 AA7 AA18

Z13

X12

X20

X27

Y4 Z19 Y6

AA3

Z5 Z9

Z12 Y2

AA6 Z4

Z8

Y11

X3

X35

X49

Z3 Z7

Z16 AA10

AA21 Z17

AA9

Z18

Z22

AA11 AA13

Z23

AA12

Z27

Y20 Y22

Z28

Y24

AA15

Y26

AA17

Y28

AA14 Z29

Y30 Y32 Y34

Z30

Y38 Y40 Y42

AA16 AA18

Y36

Z32

// COMMUNITY ROOM : FALL 2012 - ?

O26 O22

X2

X9 U8 X13

X84

V55

O19

N18

V37

T37

T41 O3

V29 V35

T29

R47

R53

V21 V27

T41

R51

O2

V15

T35

R45

O1

V19

T21

T33 R29

V13

V25 T15

T27

X5

Y7

X21 V7

T13

Y5

X17

V5

V11

T5

T19

R25 R31

M7

U8

V17 T7 R15

M8

V9

T11

R7

R13

Q21

Q22

X1

U7

V1

Q11

R1

AA5 Z2

Y1 Y3

BB158

BB150

AA4 Z1

S4

Q10

BB119

Q20

S3 Q17

Q3 Q6

BB157

DESIGN & BUILD

BB141

BB134

BB126

BB156

BB148

BB140

BB133

B17

AA1

U3


M1 M2 N1 M3 M4 M5 M6 L8

L7 L6 L5 L4 L3 L2

L1

J13 J14 J11 J12 J9 J10 J7 J8 J5 J6 J3 J4 J1 J2 P10 P23

P9 P22

P8 P21

P34 P33 P42 P49 I7 K1

I6

P32

P41 P48

I4 I2

K7

P29

F45

P28

P27

F46

K11

F48

K13

P68

K14

F50

F51

K15 F52

P57 P67

K16

P26

P25

P55 P54

P65

K18

P63

K22

G16

P61

F22 F21

F53

F24

F54 F55

F23

F34 F36

F56

G15 F37

G17

F38 F39

F40

F26

G4 G14

F25

F28 F27

F42

F41 G3

F7

F8 F9

F11

F12 G7

C7

O5 C6

O6 O7 C3

O9

C2

O10

O12

O20 O21 O32

O44

F15

F16 F57

O13

O22 O33

O45

O34

O35

O46 O52

F14

F13

C1

O11

O19

O31

G5

C4

O8 O18

O30

G6

C5

O17

O59

G10

G8

F10

O4

O51

G13

G12 G11

G2 G1

F6

F5

O43

F44

G9

O3

O50

F43

F4

O2

O42

F58

F2 F3

O29

O23 O36

O24 O38

O47

O25

O26

O55

O39

O40

O48

O49

O53

O60 O61

O54 O62

C11 C10

O63 O64

P50

P62

F20 F19

F32

F31

F35

O28

P43 P52

F18 F17

F33

O41

P53

P64

K20

P51

H1 H2

O27

P14

P36

P56

P66 K17

K21 H13 H14 H11 H12 H9 H10 H7 H8 H5 H6 F30 F29 H3 H4

P1

P15

P58

K19

O16

P2

P16

P59

K12

F49

O15

P3

P17

P44

P60

K10

F47

O14

P4

P45

K8 K9

O1

P18

P46

I1

F1

P5

P37

K6

K5

I3

P30

P38

P47

K4

K3

P6 P19

P39

K2

I5

P7 P20 P31

P31

P40

O56

O65

B26 B25 O57

O58

B30 B29

O67

O66

B1

B2 B3

B4 B5

C8 B34 B33

B38 B37

C9

B42 B41

B46 B45

B50 B49 B54 B53

B6 B7

B8 B9

B10 B12 B11 B14 B13

B16 B15 B18 B17

B20 B19 B22 B21

B24 B23 B28 B27

B32 B31 B36 B35

B40 B39 B44 B43

B48 B47

B52 B51 B56 B55

B60 B59

D1

A1

B58 B57

B62 B61


PITTSBURGH,PA

DESIGN & BUILD

C3: DIGITAL FABRICATION LAB

This Lab will house a CNC machine that will allow for precise customization of any retrofit needs. It will also contain a Vacuum former which will allow for quick reproduction of any mold made of this house. The intent for this is that through speed and accuracy a team of students will be able to fix low income homes that are in extreme need of renovation. The design and construction of the Lab will be done with both machines housed in the Mobile Fabrication Trailer and use all recycled products including cardboard and recycled plastics. The expected date of completion will be in the end of May and hopefully will begin aiding in retrofits throughout this upcoming summer.

// MOBILE LAB : FALL 2012 - ?

The Mobile Fabrication Lab is an educational, promotional, and constructional aid for C3’s presence in the Pittsburgh area. This Lab will be brought to construction sites to retrofit historic homes in the community. Many of the homes in this region are in need of repair due to soil settlements and long term environmental exposure.


1. EDUCATION / DEMONSTRATION

EDUCATION BROUGHT TO SCHOOLS

1. DEMONSTRATE TO STUDENTS A SAMPLE OF DIGITAL FABRICATION TOOLS SUCH AS A CNC MACHINE AND VACUUM FORMER 2. ALLOW STUDENTS TO DESIGN THEIR OWN PROJECTS AND PRODUCE THEM

EDUCATION IN C3

1. CLASSES WILL BE AFTER WORK HOURS - TO TARGET WORKING COMMUNITY MEMBERS 2. EDUCATION WILL BE FOCUSED ON HANDS ON PARTICIPATION

THINGS THAT CAN BE MADE


2. RETROFIT/ REHABILITATION

1. RE-FAB WILL BE BROUGHT TO CONSTRUCTION SITE 2. STUDENTS WILL MEASURE AND DIGITALLY MODEL RETROFIT NEEDS 3. PARTS WILL BE PRODUCED ON-SITE WITH DIGITAL FABRICATION TOOLS 4. FABRICATED PARTS WILL BE INSTALLED IN BUILDING 5. TRAILER WILL RETURN TO C3

1. WHEN NOT ON CONSTRUCTION SITES, THE RE-FAB WILL BE A DIGITAL FABRICATION LAB FOR STUDENTS IN C3

E FROM RE-FAB

THE PRODUCTS CREATED FROM RE-FAB WILL RANGE FROM VALUE ADDED PRODUCTS TO ESSENTIAL RETROFITS FOR LOW INCOME FAMILIES. ALL ITEMS CREATED MUST ALSO HAVE AN EDUCATIONAL INCENTIVE

// MOBILE LAB : FALL 2012 - ?

FABRICATING IN C3

DESIGN & BUILD

RETROFITTING HOUSES IN THE COMMUNITY


9:00 AM 10:00 AM 11:00 AM 12:00 AM

PUBLIC SCHOOLS IN PITTSBURGH COMMUNITIES: HIGH SCHOOLS AND MIDDLE SCHOOLS 9: 15- 9:30 : ARRIVE AT SCHOOL

HOUSES IN 9: 15- 9:30 : ARRIV

STUDENTS WILL BE BROUGHT OUT IN GROUPS FOR DEMONSTRATION

1 HR: TAKE MEASUR

UDBS STUDENTS WILL BE SPLIT UP AND PAIRED WITH HIGH SCHOOL/MIDDLE SCHOOL STUDENTS WITH LAPTOPS

1-2 HR: DIGITAL MO

FABRICATION OF STUDENT’S DESIGNS

1-2 HR: FABRICATE OUT OF CNC MACH

1:00 PM 2:00 PM

INDIVIDUAL ATTENTION TO STUDENT’S QUESTION ABOUT DESIGN AND FABRICATION

3:00 PM

30 MIN - 1 HR: INST

4:00 PM 5:00 PM 6:00 PM 7:00 PM

30 MIN : PACK UP AND RETURN TO C3

30 MIN : PACK UP A


N NEED OF RETROFIT VE AT CONSTRUCTION SITE

CONSTRUCTION JUNCTION / IN THE C3 SPACE DEPARTURE FROM C3

REMENTS

ODELING

WHEN RE-FAB IS STATIONED IN C3 THE EQUIPMENT WILL STILL BE USED FOR FABRICATING

AND RETURN TO C3

RETURN TO C3

CLASSES TAUGHT TO WORKING MEMBERS OF THE COMMUNITY

// MOBILE LAB : FALL 2012 - ?

TALLING FABRICATED PARTS

DESIGN & BUILD

E PARTS HINE


HOW COULD THE C3 U

S

N

E

S

S

|

S

AU TO

DM I N I S

N O I T A

AM

I

MY NO

PR OG R

B

ION AT TR

(

IN T E G R


BE ORGANIZED? T

R

U

C

T

U

R

E

)

INFORMATION SHARING PROGRAM COORDINATION

CONTRACTING SERVICES EXCHANGING SERVICES SHARING SERVICES SINGLE FOCUS PROGRAM MULTI FOCUS PROGRAM INTEGRATED SYSTEM

PARENT & SUBSIDIARY CORPORATION CORPORATE MERGER AND ACQUISITION JOINT VENTURE CORPORATION

// C3: BUI FALL 2012 - ?

MANAGEMENT SERVICES ORGANIZATION

DESIGN & MARKETING

JOINT PLANNING


ION AT ION AT

PR OG R N TIO

PR OG R

PR OG R

PR OG R PR OG R

IN T EG R

PARENT/SUBSIDIARY CORPORATION

A

N IO T A

ADM I NI S

AD M IN IS

N IO AT

AU TO

ION AT TR

N IO T A

ION AT TR

IN T EG R

ION AT TR

I N T

PR OG R

N IO AT IN T EG R

AM

MY NO

MY NO

N IO T A

ADM I NI S

AD M IN IS

MANAGEMENT SERVICES ORGANIZATION

AU TO

IN T EG R

ADMINISTRATIVE CONSOLIDATION

AU TO MY NO

MY NO

COLLABORATION

AM

AM

ION AT TR

INT AU TO

AM

C


IN T EG R

ION AT TR

MY NO AD M IN IS

// C3: BUI FALL 2012 - ?

IN T EG R

ION AT TR

INT EG

CORPORATE MERGE/ ACQUISITION

DESIGN & MARKETING

AU TO

ADM I NI S

PR OG R

N IO T A

MY NO

ADM I NI S

JOINT PROGRAMMING

JOINT VENTURE CORPORATION

AM

AU TO

AM

ION AT TR

AU TO

AM

MY NO

R

JOINT VENTURE CORPORATION


DECEMBER

OB

JANUARY

HOUSING PROTOTYPE

NOVEMBER

FEBRUARY

WO DECONSTRUCTION

RETROFIT MARCH

OCTOBER

WORKSHOP

R

APRIL

DECO

SEPTEMBER

AUGUST

JULY

DECEMBER

JUNE

DECEMBER

JANUARY

HOUSING PROTOTYPE

NOVEMBER

JANUARY

HOUSING PROTOTYPE

NOVEMBER

FEBRUARY

DECONSTRUCTION

RETROFIT

MARCH WORKSHOP

MARCH

OCTOBER

WORKSHOP

APRIL SEPTEMBER

AUGUST

MAY

JUNE

CONSTRUCTION JUNCTION

OCTOBER

APRIL SEPTEMBER

JULY

NOVE

FEBRUARY

DECONSTRUCTION

RETROFIT

OCTOBER

HOUSIN

MAY

SEPTEMBER

AUGUST

MAY

JULY

JUNE

URBAN DESIGN BUILD STUDIO

A


BJECTIVE

NEED

OUTPUT

OUTCOME

THIRD PARTY MATERIALS

ORKSHOP

UDBS SCRAP C.J. C.J. UDBS

TOOLS SKILLS INTEREST

MATERIALS MAN POWER

RETROFIT

HOUSING STOCK MAN POWER

HOME VALUES IMPROVED CITY

COMMUNITY

MATERIALS PROCESSED + STORED

C.J.

VALUE ADDED

C.J.

U.D.B.S YOUTHLINK

NG PROTOTYPE

MATERIALS MAN POWER

3RD PARTY C.J

COMMUNITY. UDBS

HOUSING PROTOTYPE

T.I.P

COMMUNITY

RETAIL STOCK

C.J.

PROTOTYPE WORKSHOP

U.D.B.S T.I.P.

IMPROVED CITY SKILLS GAINED

U.D.B.S YOUTHLINK

HOUSING PROTOTYPE

EMBER

DECEMBER

JANUARY

HOUSING PROTOTYPE

NOVEMBER

FEBRUARY

JANUARY

FEBRUARY

DECONSTRUCTION

DECONSTRUCTION

RETROFIT

RETROFIT

MARCH WORKSHOP

MARCH

OCTOBER

WORKSHOP

APRIL

APRIL SEPTEMBER

AUGUST

MAY

JULY

JUNE

TRADE INSTITUTE OF PITTSBURGH

AUGUST

MAY

JULY

JUNE

// C3 : FALL 2012 - COMPLETION?

DECEMBER

DESIGN & BUILD

ONSTRUCTION

AWARENESS

COMMUNITY

RETROFIT HOUSE

C.J U.D.B.S YOUTHLINK

LEARN BY TEACHING

C.J. UDBS

T.I. UDBS C.J. COMMUNITY.

3RD PARTY C.J

SKILLS GAINED

COMMUNITY. T.I.

WORKSHOP



CFA, Carnegie Mellon University

Catenary Arch Structure

mattADLER/sageALTENHOFEN/esraARAS/ christinaCHEN/sungHWANG/yingLIN/ maxPARK/rohanRATHOD/jakeRUSSO

DRAWING NOTES KEY:

PLAN

DESIGN & BUILD

Drawn by: MA

Date: 5/5/11 Revision number: 5

top view

mattADLER/sageALTENHOFEN/esraARAS/ christinaCHEN/sungHWANG/yingLIN/ maxPARK/rohanRATHOD/jakeRUSSO

DRAWING NOTES KEY:

mattADLER/sageALTENHOFEN/esraARAS/ christinaCHEN/sungHWANG/yingLIN/ maxPARK/rohanRATHOD/jakeRUSSO

Catenary Arch Structure

CFA, Carnegie Mellon University Pittsburgh, PA 15213 Materials and Assembly Professor Dale Clifford

Catenary Arch Structure

SCALE: 1/16” = 1’

FRONT ELEV

SIDE ELEV

Drawn by: CC

Drawn by: CC

Date: 4/3/11 Revision number: 5

Date: 4/3/11 Revision number: 5

perspective

SCALE: 1/16” = 1’

section

CATENARY ARCH

GREAT HALL OF COLLEGE OF FINE ARTS/ CARNEGIE MELLON, PITTSBURGH, PA This project was in colloration with Dale Clifford (professor) and Elizabeth Duray (TA), Christina Chen, Sung Hwang, Matt Adler, Max Park, Rohan Rathod, Jacob Russo, Sage Altenhofen, and Esra Aras. The assignment was to design and build a catenary arch. The final product was to be a 15 ft2 free standing structure made of plywood and mechanical joinary. 24 hours was given to build on site. The design began with precedent studies and model making which led to full-scale testing, and corresponding shop drawings. The final design consisted of three laminated arches anchored to timber footings, The canopy was a result of geometric studies done of a hexogonal grid.

// CATENARY ARCH : SPRING 2011

A3.0

A3.1 SCALE: 1/16” = 1’

Materials and Assembly Professor Dale Clifford

A2.0 CFA, Carnegie Mellon University Pittsburgh, PA 15213

DRAWING NOTES KEY:



DESIGN & BUILD

// CATENARY ARCH : SPRING 2011



In collaboration with Paulina Reyes. How do we wear our clothing? Is it simply applied like so much paint, or can it be inhabited, occupied? The APPARATUS for the 2012 Lunar Gala show explores the ambiguity between garment, prosthetic, body, and mechanism. Each look involves a combination of traditional garment construction and the digital fabrication of acryllic or wooden armatures for the body. The use of lasercut fabric adds a layer of texture and dimensionality to some of the clothes. Ten outfits were exibited for the Live Fashion show

DESIGN & EXPLORATION

LUNAR GALA

// LG : SPRING 2012



DESIGN & EXPLORATION

// LG : SPRING 2012


exploded axon of campus buildings


ENVIRONMENTAL CHARTER SCHOOL FRICK PARK//NINE MILE RUN, PITTSBURGH, PA

A project for an environmental charter school located at Nine Mile Run in the area of Frick Park in Pittsburgh, Pennsylvania.

This project introduces an educational component allowing users of Nine Mile run to be exposed to the rising environmental issues in Pittsburgh. The campus is dispersed into three academic buildings: classrooms, administrative, and lecture hall. They are intertwined by a continuous path shared with public users of Frick Park. This path takes the users along different landscapes existing in Frick park, as well as new innovations designed by students of the environmental charter school. The architecture responds to the topography of Frick Park, and considers how the environment will change with time.

1. Public circulation image of the rooftop garden

2. Campus circulation

3. Green roof

// ENVIRONMENTAL SCHOOL : FALL 2011

sectional perspective taken through classroom and lecture hall

DESIGN

Nine mile run creates the boundary for the south end of Frick Park. Renovations have been done by the city of Pittsburgh to revitalize the wetlands in this area. However, the surrounding landscape is still populated and is in need of public attention.


transect of frick park

section a

section b

level 1


image of board walk connecting the lecture hall and classrooms RED MAPLE _ ACER RUBRUM

COMMON REED _ PHRAGNITES AUSTRALIS

OAK _ QUERCUS NIGRA

CREEPING GRASS _ MICROSTEGIUM VIMINEUM,

SOURWOOD_OXYDENDRUM ARBOREUM

SAW GRASS _ CLADIUM MARISCUS

RIVER OATS _ CHASMANTHIUM LATIFOLIUM

diagram of wetland vegation and connection of boardwalk to exfilration trench

ENVIRONMENTAL CHARTER SCHOOL // PROCESS

roof level

level 2

// ENVIRONMENTAL SCHOOL : FALL 2011

The renovations made over time to better the park were noted from the site survey. In Nine Mile Run, this included an introduction of a wetland vegetation as well as boardwalk for recreational uses. These same devices were used to create continuity of the school with Frick Park.

DESIGN

The project first began with a quarter-mile site survey of Frick Park. As a studio-wide collaboration, topography, vegetation, and user’s activities were documented. This data was recorded on a transect of Frick Park.


image of shoppers and booth spilling out onto Penn Circle.

MARKET HALL

EAST LIBERTY, PITTSBURGH, PA. Located at the intersection of Penn Avenue and Penn Circle in Pittsburgh’s historic East Liberty District, this farmer’s market is a response to the complex nature of the site as well as the flexible program of a market. To propose a fexible space, a masted structure was chosen for the primary structural system. This system allows the weight of the roof to be suspended on a center column. As a result, the perimeter walls are in tension - pulling the roof down, rather than in compression. Because the perimeter walls are no longer holding up the roof, they have the ability to be rotated and allow for interaction with users of Penn Ave. and Penn Circle. To fit the complex nature of the site, three modules of the market hall were designed to be connected at the seams for the administrative spaces. The most potent aspects of the design are the three columns that reach a height of 94 feet. The purpose of the height of the columns is to place less stress on the suspension cables. Because of the prominent nature of the intersection, it also becomes an icon for the growing urban needs of East Liberity


WALL C

WALL C

WALL A

PENN AVE.

CIRC

LE

WALL B

WALL A

axon of three masted structure as well as rotating wall structure

// MARKET HALL : SPRING 2012

WALL A

ground level plan

DESIGN

WALL A

PENN

WALL B


PENN

CIRC

LE

PENN AVE.

photo of model

first foor plan

second floor plan

roof floor plan


elevation and force diagram of the masted structure

section a

DESIGN

WALL

A: ROTATING

WALL

B: TRANSPARENTCY

WALL

C: METAL SHEATHING

ROOF TO WALL

A.1

B.1

C.1

LEVEL 1 _16”

A.2

B.2

D.0

FOUNDATION A.3

B.3

C.3

// MARKET HALL : SPRING 2012

section b


rendering of the exterior and connection to Shubert

diagram of massing and facade

diagram of connection to Shubert theatre


DESIGN

BOSTON, MA

This project is an addition to the historic Shubert Theatre in Boston. The main focus of this center is to provide visibility of the dance studios to the public. The four dance rooms are double height and placed on alternating floors. This creates connection of the dancers to each other as well as viewers. The facade is correlated to the volumes of the dance studios as well as the typology of Shubert Theatre.

// PREFORMANCE CENTER : FALL 2011

PERFORMANCE CENTER


sectional perspective

rendering of the entrance from Shubert

rendering of dance/performance space


rendering of dance/performance space


level 1

rendering from stairs toward public first floor

level 2

level 3


DESIGN //

UPTOWN // PITTSBURGH, PA

This project was in collaboration with Ting Wang, Ling He, Emily Punaty, and Alexandre Kinney for the organization of Action Housing. The aim of this project is to create an affordable, residential home for a resident of Uptown living with 80 percent to median income. The project began with a thorough understanding of the project scope : Demographics, Site Location, and Developmental Prospect. The plan of house aims to attract the demographic of young professionals while abiding by the zoning and building codes. The first floor is an open kitchen and living room. The second and third each contain a bedroom, study, bathroom, and balcony. By consulting with Action Housing, this project went through revision to fit the historical, environmental, and financial context of Uptown Pittsburgh. The end product was a 96 page book containing the design and research done collaboratively.

ACTION HOUSING : FALL 2012

ACTION HOUSING


rendered sectional perspective

rendered sectional perspective


UPTOWN HOUSING // PROCESS

The cost and logistics of the house were calculated based on young professionals making a salary on median income. The final cost was $520,000 for two housing developments in Uptown.

EL = 32’ - 6” TOP OF ROOF MEMBRANE

EL = 21’ -0” TOP OF FLOOR 2

EL = 13’ - 6” TOP OF FLOOR 1 EL = 12’ - 0” TOP OF FLOOR 1

EL = 4- 0” BOTTOM OF FOOTING EL = 2’ - 0” FINISH GRADE

EL = -2’ - 0” BOTTOM OF FOOTING

ACTION HOUSING : FALL 2012

EL = 22’ - 6”

//

EL = 30’ - 0” TOP OF FLOOR 3

DESIGN

To understand who would be the potential buyer of a residential home in Uptown, research was done to observe the potential urbanization of Uptown. Surveying the existing residents was useful in understanding what they would like to see changed in Uptown. The proximity of Uptown to downtown, Oakland, UPMC, and Duquense University led to the conclusion that young professionals would be inclined to rent or purchase in Uptown.



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.