Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
2 of 24
Index Table 1
Summary of Project Progress .................................................................................... 4
2
EHS dashboard ........................................................................................................... 5
3
Areas of Concern ........................................................................................................ 6
4
Engineering and Design (Siemens AG) ..................................................................... 7
5
Engineering and Design (Orascom Construction) ................................................. 12
6
Procurement and Manufacturing (Siemens AG) ..................................................... 13
7
Procurement and Manufacturing (Orascom Construction) ................................... 16
8
Shipment Details ....................................................................................................... 18
9
Site Activities (Siemens AG) .................................................................................... 19
10 Site Activities (Orascom Construction)................................................................... 20 11 Warranty Activities .................................................................................................... 21 12 Commercial Issues ................................................................................................... 22 13 Scheduling ................................................................................................................. 23
Appendices SAG:
OC:
A 1.
Schedule
B 1.
Correspondence status OC
A 2.
Correspondence status CON
B 2.
DTL status OC
A 3.
Correspondence status SAG
B 3.
A 4.
DTL status
Burullus Progress Report incl. Photos
A 5.
Financial Report
B 4.
Payment Report
A 6.
Shipments Status
B 5.
Shipments Status
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
3 of 24
Abbreviation List BDT
Blow Down Tank
CW
Calendar Week
DTL
Document Transmittal Letter
GENO
electrical Generator
GT
Gas Turbine
HP
High Pressure
HRSG
Heat Recovery Steam Generator
HV
High Voltage
HVAC
Heat Ventilation Air Conditioning
I&C
Instrumentation and Control
IP
Intermediate Pressure
LNTP
Limited Notice to Proceed
LP
Low Pressure
P&ID
Piping and Instrumentation Diagram
PPSPS
Particular Plan regarding Safety and Protection of Health
RfQ
Request for Quotation
ST
Steam Turbine
OC
Orascom Construction
SFCS
Steam Generator, Fuel & Cooling Systems
HTT
Heat Transfer Technology
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
4 of 24
1 Summary of Project Progress 1.1 Siemens AG Regular meetings conducted this month: Owner: Weekly site management meetings. Consortium: Consortium weekly site management meetings. Consortium weekly site EHS meetings. Consortium monthly EHS meeting ∂ Milestones achieved within the reporting period: o Hot Commissioning and Phase C tests for GT 21/22 completed and Units are ready for RTR. ∂
25,3 Million Man-hours without LTI.
∂
Shipping of OEMs, HRSG, Cooling Towers, Pumps and Electrical Equipment has been continued as per schedule.
∂
Marine works Delay – (cooling water intake delay due to the impact of delayed offshore Mine scan and war remains Survey requested by Army, and the current ongoing delay to the Soil Investigation works). There is a substantial risk if the offshore element of the cooling water intake line is not completed prior to October 2017, then the whole section of this work would be delayed until May 2018 due to weather and sea conditions over the winter period, this would further effect the Combined cycle works for all the blocks 10,20,30,40, plus the Simple Cycle for block 10.
1.2 Orascom Construction See Appendix B 3. “Site Progress Report Cut-off date August 01, 2017 + Progress Photos”
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
5 of 24
2 EHS dashboard
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
6 of 24
3 Areas of Concern
#
Item Description
References
Providing construction power: ∂ Contractor is previously provided power for construction, utilizing Generators, and is seeking reimbursement for all costs associated with the provision of the Construction power 1
∂ Consortium requests Owner assistance in completing a Maintenance contract with Distribution Company to enable future rerouting and maintenance works to be carried out without delay
OC-EEHC-L-00023 SAG-OC_EEHC-L-00034 SAG-OC_EEHC-L-00044 SAG-OC_EEHC-L-00047
OCSM-EEHC-L-00098
∂ Construction Power Instability is hindering Contractor’s activities SAG-OC-EEHC-L-00018 SAG-OC-EEHC-L-00023 EEHC_SAG-OC-L-00004 SAG-OC-EEHC-L-00025 2
Site coordinates and GIS relocation – Delay to the works
EEHC_SAG-OH-L-00015 SAG-OC-EEHC-L-00029 EEHC_SAG-OH-L-00037 SAG-OC_EEHC-L-0006 EEHC_SAG-OC-L-00042 SAG-OC_EEHC-L-00150
Site Preparation Agreement (SPA) substantial increase in quantities:
3
Due to the substantial increase in quantities of the SPA, the Contractor has suffered many delays which were not attributable to the Contractor.
SAG-OC_EEHC-L-00162 SAG-OC_EEHC-L-00164 SAG-OC_EEHC-L-00169
Effect of the initial delays of the SPA works to the EPC works SAG-OC_EEHC-L-00246 especially relating to the combined cycle works for block 10 and 20 SAG-OC_EEHC-L-00273 5
Marine Works Delays due to Delay of Offshore Mine Scan. And issuance of Shore Protection and AFOA Permits / Approval Intern Siemens
SAG-OC_EEHC-L-00156 OC-EEHC-L00161
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
7 of 24
Delay in issuing of Permit effected the critical path for the Combined SAG-OC_EEHC-L-00156 Cycle works due to the delay to the Intake and Discharge works Delay in performing the Offshore mine scan is effecting the critical path for SAG-OC_EEHC-L-00166 the combined cycle schedule for all the works. SAG OC-EEHC-L-00248 There is a substantial risk that if the offshore element of the cooling SAG-OC_EEHC-L-00166 water intake line is not completed prior to October 2017, then this whole section of the work would be delayed until May 2018 due to SAG OC-EEHC-L-00248 weather and sea conditions over the winter period, this would further effect the Combined cycle works for all the blocks 10,20,30,40, plus SAG OC-EEHC-L-00267 the Simple Cycle for block 10. SAG OC-EEHC-L-00273 Sea Conditions adversely affecting the Soil Investigation and subsequent Marine offshore works. Now all works should be SAG OC-EEHC-L-00294 completed in limited duration due to the winter season exclusion SAG OC-EEHC-L-00306 SAG OC-EEHC-L-00307 SAG-OC_EEHC-L-00329 SAG-EEHC-L-00291 6
Social Insurance Authority Fees
SAG OC-EEHC-L-00076 SAG-EEHC-L-00240
7
Deliveries of equipment as a result of extended period of customs clearance
8
GASCO works associated with the Gas Reducing Station and settlement of the main Gas line, including EHS concerns
OCSM-EEHC-L00110
4 Engineering and Design (Siemens AG) 4.1 Plant Layout ∂ Site support and coordination meetings
4.2 Civil ∂ Civil Engineering Meetings at extended intervals since design is mature (now mainly with regard to construction issues). ∂ Civil Design of Spare Transformer Foundation finalized and under execution. ∂ Information exchange on design of the water Intake structures (finalization of design still pending on off-shore geotechnical investigation) ∂ Laydown areas for Service scope under preparation Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
8 of 24
∂ General site support
4.3 Process Updating of P&IDs due to engineering progress ongoing. - Duplication of Automation for other units started
4.4 Electrical / I&C (hardware/software) ∂
Ongoing engineering for electrical components for coming Units continued as: - Low voltage switchgears BFA/BFB/BFC/BFD/BMA (ST, WSC, CT), - Electrical protection systems CHA (ST), - MV- and LV-cables - I&C equipment.
∂
Cable way planning and routing is further processing Cable pulling cards hand over to site for continuing cable pulling ongoing
∂
Continued Site support for erection and commissioning works of electrical systems and I&C.
∂
500kV GIS: - 500 kV GIS phase 1 energized since November 2 nd, 2016. 500 kV GIS phase 2 energized since April 18th, 2017. TOAC reached on May 2 nd 2017.
∂ Distributed control system DCS: - Common Systems: Manufacturing for furniture and tables for central control room has been finished and is delivered to site. Erecting is done. Black Boxes for Open Cycle and Combined Cycle have been defined; signal exchange has been finished, interfaces to DCS are completed. Detail design for substation (GIS) interface has been finished, the communication software is finished. - Open Cycle Unit 41/42: Distributed control system DCS, manufacturing of ET200 stations is finished, the cabinets are already installed in the PCC. The cabinets are in operation. Local measurement devices have been delivered and are available at site. Manufacturing for emission monitoring system CEMS has been finished, system is available at site and is in operation - Open Cycle Unit 31/32: Distributed control system DCS, manufacturing of ET200 stations is finished, the cabinets are already installed in the PCC. The cabinets are in operation. Local measurement devices have been delivered and are available at site. Manufacturing for emission monitoring system CEMS has been finished, system is available at site and is in operation
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
9 of 24
- Open Cycle Unit 21/22: Distributed control system DCS, manufacturing of ET200 stations is finished, the cabinets are already installed in the PCC. The cabinets are in operation. Local measurement devices have been ordered. Manufacturing for emission monitoring system CEMS has been finished, system is available at site and is in operation - BoP Combined Cycle Unit 10: Distributed control system DCS, detail Engineering is finished. HW manufacturing is finished The cabinets are installed in PCC Manufacturing for emission monitoring system CEMS for GT11 / GT12 has been finished, system is available at site Measurement devices have been delivered and are available at site. - BoP Combined Cycle Unit 20: Distributed control system DCS, detail Engineering is finished. HW manufacturing is finished The ET200 cabinets are installed in PCC Measurement devices have been delivered and are available at site. - BoP Combined Cycle Unit 30: Distributed control system DCS, detail Engineering is finished. HW manufacturing is finished The ET200 cabinets are installed in PCC Measurement devices have been delivered and are available at site. - BoP Combined Cycle Unit 40: Distributed control system DCS, detail Engineering is finished. HW manufacturing is finished. The ET200 cabinets are installed in PCC Measurement devices are on the way to the site (will be arrived end of August)
4.5 BOP Piping System Component
Engineering and Design
Insulation
- Piping Basic Design in 3D model finished. - Piping Detail Design finished - Design finished
Valves
-
Piping
Intern Siemens
Detail Design finished
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
10 of 24
4.6 Mechanical, Fuel & Cooling Systems ∂ Fuel-Supply-System - HEAT FGSS Unit part: Unit 11/12/21/22/31/32/41/42 delivered to erection site / completed - Petrogas FGSS Common Part completed ∂ Gas Compressor - Common components for all units delivered to site (nitrogen generator, switch-over valve skids, I&C-container) - Gas Compressor Unit 40 delivered to erection site - Gas Compressor Unit 30 delivered to erection site - Gas Compressor Unit 00 delivered to erection site - Gas Compressor Unit 20 delivered to erection site - Gas Compressor Unit 10 delivered to erection site ∂ Wet Cell Cooling Tower -
Unit 10 delivered to erection site Unit 20 delivered to erection site Unit 30 delivered to erection site Unit 40 delivered to erection site Balance material shipment ongoing (6122)
∂ Bypass stack -
Bypass stack Unit 42 delivered to erection site Bypass stack Unit 41 delivered to erection site Bypass stack Unit 32 delivered to erection site Bypass stack Unit 31 delivered to erection site Bypass stack Unit 22 delivered to erection site Bypass stack Unit 21 delivered to erection site Bypass stack Unit 12 delivered to erection site Bypass stack Unit 11 delivered to erection site Duct pieces to HRSG delivered to erection site Balance material shipment ongoing (6137, 6141)
∂ HP Bypass station -
Unit 41/42 shipment (5204) delivered to erection site Unit 31/32 shipment (5025) delivered to erection site Unit 21/22 shipment (4856) delivered to erection site Unit 11/12 shipment (4877) delivered to erection site
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
11 of 24
4.7 HTT / Steam Generator 4.7.1 -
HRSG / HTT Basic process design HRSG completed. Basic mechanical design pressure parts HRSG completed. Detailed mechanical design of HRSG modules and vessels completed. Basic mechanical design HRSG main steel structure and casing completed. Detailed mechanical design HRSG main steel structure and casing completed. Basic mechanical design of stack completed. Basic design platforms, stairs and ladders final. Detailed design platforms, stairs and ladders completed. HRSG 3D modelling and piping design in progress. Final review of large bore isometrics completed. Small bore piping design completed. Specifications of HRSG equipment (valves, control valves, attemperators, silencers, stack dampers, etc.) completed. Receipt and review of vendor documentation completed. Design of maintenance provisions completed. Erection manual issued. Completed Operation and Maintenance manual. Continued compiling manufacturing documentation of the subcontractors/suppliers.
4.8 OEM Products 4.8.1
Gas Turbines
- Engineering, procurement and manufacturing is completed. 4.8.2
Steam Turbines
- Engineering and procurement is completed. 4.8.3
Generators
- Engineering, procurement and manufacturing is completed.
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
12 of 24
5 Engineering and Design (Orascom Construction) 5.1 Civil and Architecture ∂ SAG documents are regularly reviewed and comments issued to SAG as applicable. ∂ Review of OC technical submittals. ∂ Site support (reply for TQ and clarification emails). Issued to OC for Construction: ∂ ∂ ∂ ∂ ∂ ∂
Steam turbine building architectural drawings Service water pump house area concrete neat line piles arrangement Revised onshore discharge structure concrete neat line foundation plan & sections Revised truck unloading shed regeneration plant structural steel Service water pump house semi - gantry crane steel structure supports Revised steam turbine building structural steel framing elevation
5.2 Plant Layout and Piping Issued to OC for Construction: ∂ Revised plant layout.
5.3 Mechanical & Process ∂ Review of suppliers technical submittals.
5.4 Electrical / I&C (hardware/software) Issued MTOs: ∂ BOP cable trays of service water pump house (00UQB) - Material Take - Off MTO "100%' ∂ BOP cable trays' supports of service water pump house (00UQB) - Material Take-Off MTO "100%' Issued to OC for Construction: ∂ Foundation earthing typical for (PAR) system units 10, 20, 30 & 40 ∂ Revised wet cell cooling tower building (20URA) lightning protection system layout shop drawing typical for (30URA & 40URA) ∂ IP dect RBS system shop drawing layout ∂ BOP cable trays & supports arrangement drawing for service water pump house ∂ Revised guards dormitory building (00UYB) ground floor lighting and power sockets system layout preliminary design ∂ Revised guards dormitory building panel schedules preliminary design ∂ Earthing plan for pump house area plan Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
∂ ∂ ∂ ∂ ∂ ∂ ∂ ∂
Page
13 of 24
Revised duct bank & manholes details hypochlorite building area (2 sheets) Revised foundation earthing for service water pump house Preliminary plant overall paging and siren systems one line diagram Revised BOP cable trays & supports arrangement drawing for service water pump house Revised earthing plan for pump house area plan Revised preliminary plant overall telephone, Lan and general clock systems one line diagram Hydrogen building (00UTG02) ground floor lighting system shop drawing layout Hydrogen building lightning system protection roof plan
6 Procurement and Manufacturing (Siemens AG) Component
Company
Workshop Equipment
Walter & Müller
Location of Headquarter Germany
6.1 Civil - Please refer to item 6
6.2 Process - Please refer to item 6
6.3 Electrical / I&C (hardware/software) - For details Please refer to item 4.4
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
14 of 24
6.4 Piping Component Piping - Open Cycle Supply and Prefabrication incl. Supports ∂ Finalized. All material has been delivered. Piping – High Pressure Supply and Prefabrication ∂ Delivery completed Piping - Medium and Low Pressure Supply and Prefabrication ∂ All Material sent Piping – HP, IP & LP Supports (excluding Open Cycle supports) ∂ nearly all Material sent Piping – GRP Material (Cooling water + pressurized GM Pipes) ∂ Delivery complete Insulation ∂ Delivery nearly completed Valves Lot 1 – Manufacturer HP – P91 Gate Valves Valves Lot 2 – Manufacturer HP – CS Gate Valves and Non Return Valves Valves Lot 3 – Manufacturer HP Valves Valves Lot 4 – Manufacturer IP/LP Gate Valves and Non Return Valves Valves Lot 5 - Manufacturer IP/LP Valves Valves Lot 6 – Distributor Package Valves Lot 7 – Open Cycle Package ∂ Finalized. All valves have been delivered. Control Valves Lot 8 – HP Control Valves Control Valves Lot 9 – IP/LP Control Valves Control Valves Lot 10 – Butterfly Control Valves (Metal Sealing)
Company
Location of Headquarter
VAM/BPT
Austria
Namin Siemens LTD.
Korea
Lisega
Germany
FKT
Germany
IIG HP Valves
Germany Netherlands
HP Valves HP Valves HP Valves HP Valves Siekmann
Netherlands Netherlands Netherlands Netherlands Germany
Klaus Union Daume Daume Pentair
Germany Germany Germany Pentair
India
6.5 Mechanical - Please refer to item 6 Fire detection and protection system for UMA, UMB, and Transformer yard
- Erection for units 11/12 ongoing - Erection for unit 10 under preparation 6.6 HTT / Steam Generator 6.6.1
HRSG / HTT
Ordering: - Nothing to report Manufacturing Main Parts Pressure Part Modules (@GS Entec - South Korea) - Modules for all units shipped. Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
15 of 24
Drums, HP Separator and Vessels - LP and IP drum, HP separator and blow down tank for all units shipped. Main Steel, Casing, Ducting and Stack (@VPE - Thailand) - Main steel, casing and inlet duct all units shipped. - Stack and outlet duct all units shipped. Secondary Steel - Shipped for all units. LB Piping fabrication (@SGC – South Korea) - Piping for all units shipped.
6.7 OEM Products 6.7.1
Gas Turbines
- Engineering, procurement and manufacturing is completed. 6.7.2
Steam Turbines
- Manufacturing of steam turbines components is completed except for insulation (Unit 40). 6.7.3
Generators
- Engineering, procurement and manufacturing is completed.
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
16 of 24
7 Procurement and Manufacturing (Orascom Construction)
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
JUN.2015
Completed Procurement Works
Third party testing lab Contractor and Owner Temporary Site JUL.2015 offices On Site concrete batch plant SEP.2015 Steel structure fabrication Painting for GIS steel structure Reinforcing Steel (Partial PO representing 30% of the total estimated quantity) OCT.2015 Roofing and waterproofing works Temporary RO plant Wall and roof metal cladding NOV.2015 Steel pipes for driven piles GIS building steel doors GIS building aluminum windows Turbines' halls overhead cranes DEC.2015 GIS HVAC works Steel structure for the CTG (4 blocks) GIS Building Raised Floor GIS building roll up door Cable Trays including Supports JAN.2016 CTG HVAC works GIS firefighting and alarm works CCR HVAC Works Fire Fighting valves and hydrants Feb.2016 I&C Cables for eight (8) GTGs Secondary Earthing System Aux Erection Material
Intern Siemens
Vendor CEL
Country of Origin Egypt
ICON Lafarge NSF Jotun
Egypt Egypt Egypt Egypt
Feralpi Siderurgica SPA A-Build Metito Italpanneli Umran France Metal AluTech GH SEMCO KiMetal / NSF Proactive ESIA FEMI SEMCO Total Walter SEMCO AVK TK Cables Chembre Chembre
Italy Egypt Egypt Italy Turkey Egypt Egypt Spain Egypt Italy Egypt Italy Italy Egypt Germany Egypt Germany Italy Italy Italy
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 43 43 43 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 70 71
Mar.2016
Apr. 2016
May 2016
June 2016
Jul 2016
Aug 2016
Sep 2016
Oct 2016 Nov 2016
Intern Siemens
Page
GIS, GIS Control, and CCR Lighting Fixtures Fire Fighting Pump Water and Waste Water Treatment Plant Containerized fire-fighting system Air Compressor Wall and roof metal cladding for CTG Wick Drains MV/LV Power Cables' Accessories Underground firefighting pipeline LV Switchgear RCCP lines Fire Fighting for CCR Building U/G HDPE Pipes Gas pipeline Compressed air system pipelines Gas Pipeline Balance Heavy lifting works CCTV System Clock System CTG & STG Roll up Doors UPS Emergency Shower & Eye Wash Gas storage racks Co2 Breather Level indicator Horizontal Centrifugal Pumps Gas Bottles Sump Pumps Hydrogen Generation Plant PABX Obstruction Lights Valves Special Supports Tanks Accessories Special Supports Vertical Pumps Travelling Water Screens Off shore Cooling Water Pipeline Onshore Cooling Water Pipeline Fire fighting for BoP Buildings Valves for Cooling Water Lines
Disano Gruppo Aturia EMIT/Metito SANCO Atlas Copco Italpanneli Bonar Tyco Shield Alfaquadri NPC / ECPC ETEA Euro Tubi CTA CTA CTA SARENS FGM Tesylab ISEA Benning Safetec Ramcro TWS Seven Seas Garbarino Recoma Seven Seas IPM - Easter Electrolyster Tesylab Clampco PARCOL Tuxor Seven Seas Tuxor Termomicnanica Tarnos Pipelife Agru SANCO PARCOL
17 of 24
Italy Italy Italy Italy Italy Italy Netherland Italy UK Italy Egypt Italy Italy Italy Italy Italy Italy Italy Italy Italy Germany Italy Italy Italy Italy Italy Italy Italy Italy / India Italy Italy Italy Italy Italy Italy Italy Spain Norway Austria Italy Italy
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
72 73 74 75 76 77 78 79 80 81 82 83 84 85
Dec 2016
Jan 2017
Feb 2017
Mar 2017 Apr 2017 May 2017
Page
Stop Logs HVAC for BoP and Ancillary Buildings Sump Pumps HRSG Lighting Fixtures Valves for Chemical Cleaning Instrumentation Piping for Chemical cleaning Valves for chemical cleaning Workshop OH Crane Intake Sediment Removal System Intake Heads Accessories Labels & Tags CCTV Console Pump House Gantry Crane
Eurocom SEMCO Garbarino Beghelli Gusmar Endress & Hauser CTA Global Sourcing Gusmar GH Dragflow William Form FAM Media ICOT GH
18 of 24
Italy Egypt Italy Italy Italy Italy Italy Italy Spain Italy USA Egypt USA Spain
8 Shipment Details 8.1 Siemens AG See Appendix A 6 “Shipments Status”.
8.2 Orascom Construction See Appendix B 5 “Shipments Status Report”.
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
19 of 24
9 Site Activities (Siemens AG) 9.1 Unit 00 - xxEK modifications (HW&SW) completed - xxEKH outage works completed
9.2 Block 2 Unit 21/22 - Cleaning of 21/22 BAT brushes - Closing of punch items for GT21/22 prior to performance test and RTR
9.3 Block 1 Unit 11/12 - 11/12/13 BAT commissioning ongoing - 12 CHA transformer protection commissioning (secondary injection) ongoing - 11/12 CPD energized and I&C signal test started
9.4 Block 3 Unit 31/32 - Commercial Operation (offline due to GASCO outage) Preparation of units for restart
9.5 Block 4 Unit 41/42: - Commercial Operation (offline due to GASCO outage) Preparation of units for restart
9.6 Overall Plant/Operation Nothing to report.
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
20 of 24
10 Site Activities (Orascom Construction) 10.1 Over all progress status: See Appendix B 3. “Site Progress Report Cut-off date August 01, 2017 + Progress Photos�
10.2 Quality Management/ Quality Control - QC Statistics:
IIR'S Status Item
Total
Open
Civil
14778
Mech Elec Total
Closed
Rejected
0
1st 14770
2nd 5
7213
0
7126
55
32
4265 26256
0 0
4239 26135
22 82
4 39
3
NCR Status NCR Status
Total
Open
Closed
Rejected
Piles/D. Walling/Ground Anchors
76
0
76
0
Water & Damp Proofing
3
0
3
0
Structural Concrete
6
0
6
0
Drainage/Underground Utilities
2
0
2
0
Structural Steelwork
7
0
7
0
Block Works/Brick Works
1
0
1
0
Electrical Installations
20 32
3 2
17 30
0 0
147
5
142
0
Mechanical Installations Total
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
21 of 24
MRR's Status
11
MRR's Status
Total
Accepted
Pending
Rejected
Civil
295
295
0
0
Mechanical
213
213
0
0
Electrical
412
412
0
0
Architectural
168
168
0
0
Steel Rebar
181
181
0
0
Steel Structure
278
278
0
0
I&C
39
39
0
0
Elec-Mech
29
29
0
0
Total
1615
1615
0
0
Warranty Activities Warranty Cases
Total
32 Thereof
Closed
Open
28 Thereof
Intern Siemens
4
Accepted
5
Accepted with Reservations
13
Rejected
6
Done (waiting for delivery of SP to Owner)
0
Done (waiting for signature by Owner)
4
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
22 of 24
12 Commercial Issues Siemens AG / Orascom Construction 12.1 Payment Status: a) Siemens AG Scope:
- Utilization Request No. 9 (34’4 EUR) was paid on 26 July 2017. - Payment for Utilization Request No. 10 with ref. to Application for Payment dtd. 24 July 2017 (4 Milestones, Total: 11’8 EUR) is expected to be received in August 2017. - Overdue payments: EGP payments with regard to Application for Payment dated 09 May 2017 (1’0 EUR), Application for Payment dated 24 May 2017 (3’4) and Application for Payment dated 14 June 2017 (0’9) - Milestone “FOB Shipment Steam Turbine Core Engine (HP,IP,LP) - Unit 40” (EUR 3’5) held back due to further documentation requests received Upcoming Milestones scheduled to be achieved within the next 4 weeks: Total Amount to be paid
Activity
Milestone Activity
CC-ON-9
Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 10
CC-ON-10
Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 20
CC-ON-11
Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 30
CC-ON-12
Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 40
CC-ON-17
Finalisation of erection HRSG Modules - Unit 31
CC-ON-18
Finalisation of erection HRSG Modules - Unit 32
CC-ON-19
Finalisation of erection HRSG Modules - Unit 41
CC-ON-20
Finalisation of erection HRSG Modules - Unit 42 Total Value:
1.053.566,34 1.053.566,34 1.053.566,34 1.053.566,34 1.053.566,34 1.053.566,34 1.053.566,34 1.053.566,34 8.428.530,72
To be paid in EURO under the Hermes Facility Agreement
879.621,99 879.621,99 879.621,99 879.621,99 879.621,99 879.621,99 879.621,99 879.621,99 7.036.975,92
To be paid in equivalent EGP
173.944,35 173.944,35 173.944,35 173.944,35 173.944,35 173.944,35 173.944,35 173.944,35 1.391.554,80
- For further details please refer to the Annex A5_Financial Report b) Orascom Scope - See Appendix B 4. “Payment Report”
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
23 of 24
13 Scheduling Please find attached Owner’s updated schedule which indicates various impacted dates for the Power to Grid milestones. The variances and delays in the below table and schedule do not reflect the consortium entitlement due to all impacts from SPA change in quantities or Site Stoppage but reflect the best forecasted finish dates after implementing serious mitigation plans to adsorb the maximum possible of the occurred delays. The mine scan works are now complete and the Soil Investigation works have commenced, however these works are also suffering ongoing delays due to sea conditions as noted in the below table. Once the Soil Investigation works associated with the offshore works are complete and the results can be analysed by the design team, then further review of the schedule can be made to see where any further mitigation measures can be adopted. In an effort to mitigate the effect of the delay it is worth note that the Mobilisation of the Dredging equipment has started and the Dredger will arrive early next month (Note arrived on site 8th August 2017), the effect of this mitigation will be reviewed in the next month’s schedule. Impacted Dates: Nov-15
Owner Schedule 25-July-17
Base Line Project Date
Variance Between Impacted Power Impacted Power to Grid Date to Grid Date Updated Schedule Updated Schedule Cutoff Date July 25, Cutoff Date July 25, 2017 2017 and the BL Milestones date
POWER TO GRID 42
31-Dec-16
Done
POWER TO GRID 41
31-Dec-16
Done
POWER TO GRID 32
31-Dec-16
Done
POWER TO GRID 31
31-Dec-16
Done
POWER TO GRID 22
31-May-17
Done
POWER TO GRID 21
31-May-17
Done
POWER TO GRID 40
30-Apr-18
14-Nov-18
-198
POWER TO GRID 30
31-Mar-18
25-Oct-18
-208
POWER TO GRID 20
31-Dec-17
11-Aug-18
-223
POWER TO GRID 10
30-Nov-17
15-Jul-18
-227
Comments
Refference to letter: 2015-22-SAG-OC-EEHC-L-00342: Force Majeure due to bad weather conditions caused extra delays of 26 days during the period from 26th June 2017 till 25th Jul 2017 (which is the reported period in this documet).
This reduction in the overall negative variance has been achieved by utilizing significant measures to accelerate the works which include but are not limited to: ƒ Carrying out many activities concurrently.
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
Page
24 of 24
ƒ Extending working hours to 24 hours per day, 7 days per week (including night shifts, weekends and holidays). Additional manpower and staff have been mobilised to Site to cover the requirements for weekend working. Additional equipment has also been mobilised to Site to cover the additional down time and scheduled maintenance programmes necessary to ensure continuous operations, also additional large size equipment has been mobilised to Site especially for the EPC works. ƒ Deployment of additional expatriate supervisor personal of sub vendors in order to cope with the accelerated working regime as mentioned above. ƒ Mobilization from outside of Egypt of additional Contractor-owned equipment at a very short notice. ƒ Purchasing new equipment from outside of Egypt that requires payment in foreign currency. ƒ Redesign of and rerouting works, including cable routes associated with the GIS relocation ƒ We would note however that there are still substantial risks associated with the schedule, these include, but are not limited to: -
-
Marine works Delay – (cooling water intake delay due to the impact of the delayed offshore Mine scan and war remains Survey requested by Army, and the current ongoing delay to the Soil Investigation works). There is a substantial risk that if the offshore element of the cooling water intake line is not completed prior to October 2017, then this whole section of the work would be delayed until May 2018 due to weather and sea conditions over the winter period, this would further effect the Combined cycle works for all the blocks 10,20,30,40, plus the Simple Cycle for block 10. Deliveries of equipment as a result of extended period of customs clearance Offshore works (weather), now all works should be completed in limited duration due to the winter season exclusion. Increased risk due to the overlapping activities and congestion of the work area leading also to works access issues Overlapping activities due to SPA increase and increased inefficiency due to overlapping into combined cycle Works. Priority given to 1st Open Cycle of module 40 and 30, with power to grid targets in December 2016 at expense of other Works. Remaining works associated with the GIS building relocation e.g. the rerouting of the HV Cables and additional Cable Ducting. Weather delays – High winds and rains effecting the works Sea Conditions adversely affecting the Soil Investigation and subsequent Marine works offshore.
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
A 1. Schedule / Progress Curves -
see item 11
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
s
EG1019 Burullus
Progress Curves (Rev. 0U)
Progress Curve Project Consortium 100,0 90,0 80,0 70,0 60,0 50,0 40,0 30,0 20,0
Baseline
10,0
Actual / Forecast
0,0
Dez 15
Jan 16
Feb 16
Mrz 16
Apr 16
Mai 16
Jul 16
Aug 16
Sep 16
Okt 16
Nov 16
Dez 16
Jan 17
Feb 17
Mrz 17
Apr 17
Mai 17
Jun 17
Jul 17
Aug 17
Sep 17
Feb 18
Mrz 18
Apr 18
Mai 18
Jun 18
Jul 18
2,3
3,8
5,8
8,2
11,4
15,2
19,2
24,4
29,8
35,4
40,8
46,3
52,3
58,3
64,6
70,4
75,5
80,1
83,8
87,0
89,5
91,7
93,4
95,0
96,3
97,4
98,3
99,0
99,5
99,7
99,8
99,9
99,9
100,0
100,0
100,0
1,2
2,0
3,1
4,6
6,6
9,8
14,0
18,4
23,0
28,2
34,0
40,2
45,2
51,3
56,8
62,7
67,7
72,9
76,4
79,3
81,7
83,6
86,6
88,9
90,6
92,9
95,3
96,9
98,3
99,1
99,5
99,7
99,7
99,8
99,9
100,0
100,0
Design Consortium Supply Consortium Civil + Construction Consortium M + E Erection Consortium
Baseline Actual / Frcst Baseline Actual / Frcst Baseline Actual / Frcst Baseline Actual / Frcst
0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0
0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0
0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0
0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0
0,1 0,1 0,0 0,0 0,0 0,0 0,0 0,0
2,6 2,6 0,5 0,5 0,6 0,0 0,0 0,0
7,6 7,7 1,1 1,2 1,0 0,0 0,0 0,0
12,8 12,9 2,1 2,1 1,6 0,0 0,0 0,0
18,2 17,7 3,5 3,5 2,3 0,0 0,0 0,0
23,9 22,7 5,6 5,2 3,2 0,3 0,0 0,0
30,7 28,4 8,4 7,7 4,8 1,0 0,0 0,0
37,2 37,4 12,4 11,8 7,4 1,5 0,0 0,0
43,8 41,2 17,1 17,4 10,1 4,4 0,0 0,0
52,1 48,3 22,2 22,9 13,4 8,2 0,0 0,0
62,5 52,2 28,6 28,9 19,1 10,0 1,5 1,5
72,7 63,7 35,2 34,7 25,3 17,6 2,8 2,8
80,9 71,5 41,8 41,2 33,9 25,9 4,3 4,4
86,6 79,8 47,9 49,1 43,8 30,7 5,9 5,2
90,0 83,1 54,2 55,5 53,6 35,1 8,4 6,3
93,1 86,4 60,7 62,9 62,2 42,5 12,3 8,2
94,7 88,7 67,3 69,7 68,5 48,3 17,5 10,5
95,8 91,1 74,2 76,6 74,1 55,3 22,9 13,9
96,7 93,7 80,4 82,0 80,1 61,9 28,1 18,0
97,0 94,2 85,8 87,2 86,0 64,7 33,4 23,7
97,6 95,1 90,3 90,9 91,1 69,2 39,1 26,2
98,0 96,1 93,7 94,1 94,0 71,7 46,0 29,2
98,2 97,0 96,3 96,4 95,6 73,7 53,5 32,5
98,6 97,5 98,0 97,8 96,8 76,6 61,3 36,2
99,2 97,6 99,0 98,9 97,8 83,2 68,8 45,3
99,4 98,2 99,5 99,3 98,6 88,3 76,1 55,0
100,0 98,6 99,8 99,6 99,1 91,3 82,7 62,9
100,0 99,3 99,9 99,7 99,7 95,7 87,8 72,8
100,0 100,0 99,9 99,9 99,8 99,8 92,6 82,6
100,0 100,0 100,0 99,9 100,0 100,0 96,4 89,8
100,0 100,0 100,0 100,0 100,0 100,0 98,6 96,9
100,0 100,0 100,0 100,0 100,0 100,0 99,6 99,6
100,0 100,0 100,0 100,0 100,0 100,0 99,9 99,9
100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
Unrestricted
Jan 18
Nov 15
1,3
0,5
Dez 17
Okt 15
0,5
0,0
Nov 17
Sep 15
0,0
0,0
Okt 17
Aug 15
0,0
0,0
Jun 16
Jul 15
0,0
0,0
Mai 15
0,0
0,0
Apr 15
0,0
Actual / Frcst
Mrz 15
Baseline
Feb 15
PROJECT Consortium
Jan 15
Jun 15
WTG
%
100,0%
4,6% 67,5% 8,3% 15,5%
s
EG1019 Burullus
Progress Curves (Rev. 0U)
Progress Curve Design Consortium 100,0 90,0 80,0 70,0 60,0 50,0 40,0 30,0 20,0 Baseline
10,0
Actual / Forecast
0,0
Note : All Cumulative (early dates)
Unrestricted
Mrz 15
Apr 15
Mai 15
Jun 15
Jul 15
Aug 15
Sep 15
Okt 15
Nov 15
Dez 15
Jan 16
Feb 16
Mrz 16
Apr 16
Mai 16
Jun 16
Jul 16
Aug 16
Sep 16
Okt 16
Nov 16
Dez 16
Jan 17
Feb 17
Mrz 17
Apr 17
Jun 17
Jul 17
Aug 17
Sep 17
Okt 17
Nov 17
Baseline
0,0
0,0
0,0
0,0
0,1
2,8
7,8
13,4
19,6
26,1
32,3
38,1
44,0
51,5
61,2
71,1
79,3
85,7
89,8
93,1
94,7
95,8
96,7
97,0
97,6
98,0
98,2
98,6
99,2
99,4
100,0
100,0
100,0
100,0
100,0
Actual / Frcst
0,0
0,0
0,0
0,0
0,1
2,6
7,7
12,9
17,7
22,7
28,4
37,4
41,2
48,3
52,2
63,7
71,5
79,8
83,1
86,4
88,7
91,1
93,7
94,2
95,1
96,1
97,0
97,5
97,6
98,2
98,6
99,3
100,0
100,0
100,0
Mai 17
Feb 15
Design Consortium
Jan 15
WTG
%
4,6%
s
EG1019 Burullus
Progress Curves (Rev. 0U)
Progress Curve Supply Consortium 100,0 90,0 80,0 70,0 60,0 50,0 40,0 30,0 20,0 Baseline
10,0
Actual / Forecast
0,0
Note : All Cumulative (early dates)
Unrestricted
Sep 17
Okt 17
35,2
41,8
47,9
54,2
60,7
67,3
74,2
80,4
85,8
90,3
93,7
96,3
98,0
99,0
99,5
99,8
99,9
99,9
100,0
100,0
100,0
100,0
28,9
34,7
41,2
49,1
55,5
62,9
69,7
76,6
82,0
87,2
90,9
94,1
96,4
97,8
98,9
99,3
99,6
99,7
99,9
99,9
100,0
100,0
100,0
Jan 18
Mai 17
28,7
22,9
Dez 17
Apr 17
22,5
17,4
Nov 17
Mrz 17
17,6
11,8
Aug 17
Sep 16
12,8
7,7
Jul 17
Aug 16
8,9
5,2
Jun 17
Jul 16
6,1
3,5
Feb 17
Dez 15
3,8
2,1
Jan 17
Nov 15
2,3
1,2
Dez 16
Okt 15
1,2
0,5
Nov 16
Sep 15
0,5
0,0
Okt 16
Aug 15
0,0
0,0
Jun 16
Jul 15
0,0
0,0
Mai 16
Jun 15
0,0
0,0
Apr 16
Mai 15
0,0
0,0
Mrz 16
Apr 15
0,0
Actual / Frcst
Feb 16
Mrz 15
Baseline
Jan 16
Feb 15
Supply Consortium
Jan 15
WTG
%
67,5%
s
EG1019 Burullus
Progress Curves (Rev. 0U)
Progress Curve Civil + Construction Consortium 100,0 90,0 80,0 70,0 60,0 50,0 40,0 30,0 20,0 Baseline
10,0
Actual / Forecast
0,0
Feb 16
Mrz 16
Jul 16
Aug 16
Sep 16
Okt 16
Nov 16
Dez 16
Jan 17
Feb 17
Mrz 17
Apr 17
Mai 17
Jun 17
Jul 17
Aug 17
Sep 17
Okt 17
Nov 17
Dez 17
Jan 18
Feb 18
9,0
12,3
15,8
19,6
23,6
27,6
34,0
42,5
51,2
59,7
67,2
73,4
79,6
85,6
91,1
94,0
95,6
96,8
97,8
98,6
99,1
99,7
99,8
100,0
100,0
100,0
100,0
100,0
0,3
1,0
1,5
4,4
8,2
10,0
17,6
25,9
30,7
35,1
42,5
48,3
55,3
61,9
64,7
69,2
71,7
73,7
76,6
83,2
88,3
91,3
95,7
99,8
100,0
100,0
100,0
100,0
100,0
Note : All Cumulative (early dates)
Unrestricted
Jun 16
Jan 16
6,3
0,0
Mai 16
Dez 15
3,6
0,0
Apr 16
Nov 15
2,0
0,0
Okt 15
1,0
0,0
Sep 15
0,6
0,0
Jul 15
0,0
0,0
Jun 15
0,0
0,0
Mai 15
0,0
0,0
Apr 15
0,0
0,0
Mrz 15
0,0
Actual / Frcst
Feb 15
Baseline
Jan 15
Civil + Construction Consortium
Aug 15
WTG
%
8,26%
s
EG1019 Burullus
Progress Curves (Rev. 0U)
Progress Curve M+E Erection Consortium 100,0 90,0 80,0 70,0 60,0 50,0 40,0 30,0 20,0 Baseline
10,0
Actual / Forecast
0,0
Note : All Cumulative (early dates)
Unrestricted
Aug 15
Sep 15
Okt 15
Nov 15
Dez 15
Jan 16
Feb 16
Mrz 16
Apr 16
Mai 16
Jun 16
Jul 16
Aug 16
Sep 16
Okt 16
Nov 16
Dez 16
Jan 17
Feb 17
Mrz 17
Apr 17
Mai 17
Jun 17
Jan 18
Feb 18
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
1,5
2,8
4,3
5,9
8,4
12,3
17,5
22,9
28,1
33,4
39,1
46,0
53,5
61,3
68,9
76,1
82,7
87,8
92,6
96,4
98,6
99,6
99,9
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
1,5
2,8
4,4
5,2
6,3
8,2
10,5
13,9
18,0
23,7
26,2
29,2
32,5
36,2
45,3
55,0
62,9
72,8
82,6
89,8
96,9
99,6
99,9
100,0
Dez 17
Jul 15
0,0
0,0
Nov 17
Jun 15
0,0
0,0
Okt 17
Mai 15
0,0
0,0
Sep 17
Apr 15
0,0
Actual / Frcst
Aug 17
Mrz 15
Baseline
Jul 17
Feb 15
M+E Erection Consortium
Jan 15
WTG
%
15,53%
s
EG1019 Burullus
Progress Curves (Rev. 0U)
Progress Curve Commissioning Consortium 100,0 90,0
80,0 70,0
60,0
50,0 40,0
30,0
20,0 Baseline
10,0
Actual / Forecast
0,0
Feb 15
Mrz 15
Apr 15
Mai 15
Jun 15
Jul 15
Aug 15
Sep 15
Okt 15
Nov 15
Dez 15
Jan 16
Feb 16
Mrz 16
Apr 16
Mai 16
Jun 16
Jul 16
Aug 16
Sep 16
Okt 16
Nov 16
Dez 16
Jan 17
Feb 17
Mrz 17
Apr 17
Mai 17
Jun 17
Jul 17
Aug 17
Sep 17
Okt 17
Nov 17
Dez 17
Jan 18
Feb 18
Mrz 18
Apr 18
Mai 18
Jun 18
Jul 18
Aug 18
Commissioning Consortium
Jan 15
WTG
Baseline
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,2
0,8
1,7
3,2
5,2
10,9
17,0
21,2
24,1
26,8
30,2
32,8
37,0
40,5
48,2
58,0
66,6
73,5
82,2
89,4
93,4
95,9
97,4
98,5
99,5
99,9
100,0
100,0
Actual / Frcst
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
2,4
17,6
20,1
22,2
25,2
27,1
34,9
37,0
37,9
43,1
52,8
65,1
71,7
79,4
88,1
92,1
93,6
95,8
97,4
98,8
99,5
100,0
Note : All Cumulative (early dates)
Unrestricted
%
4,07%
s
EG1019 Burullus
Breakdown
Progress Curves (Rev. 0U)
Unrestricted
Jul 15
Aug 15
Sep 15
Okt 15
Nov 15
Dez 15
Jan 16
Feb 16
Mrz 16
Apr 16
Mai 16
Jun 16
Jul 16
Aug 16
Sep 16
Okt 16
Nov 16
Dez 16
Jan 17
Feb 17
Mrz 17
Apr 17
Mai 17
Jun 17
Jul 17
Aug 17
Sep 17
Nov 17
Dez 17
Jan 18
Feb 18
Mrz 18
Apr 18
Mai 18
Jun 18
Jul 18
PROJECT Consortium
Baseline
0,0
0,0
0,0
0,0
0,0
0,5
1,3
2,3
3,8
5,8
8,2
11,4
15,2
19,2
24,4
29,8
35,4
40,8
46,3
52,3
58,3
64,6
70,4
75,5
80,1
83,8
87,0
89,5
91,7
93,4
95,0
96,3
97,4
98,3
99,0
99,5
99,7
99,8
99,9
99,9
100,0
100,0
100,0
Actual / Frcst
0,0
0,0
0,0
0,0
0,0
0,5
1,2
2,0
3,1
4,6
6,6
9,8
14,0
18,4
23,0
28,2
34,0
40,2
45,2
51,3
56,8
62,7
67,7
72,9
76,4
79,3
81,7
83,6
86,6
88,9
90,6
92,9
95,3
96,9
98,3
99,1
99,5
99,7
99,7
99,8
99,9
100,0
100,0
TOTAL Siemens TOTAL Orascom
Baseline Actual / Frcst Baseline Actual / Frcst
0,0
0,0
0,0
0,0
0,0
0,7
1,8
3,2
5,0
7,6
10,6
14,3
18,4
22,6
27,7
32,9
38,5
44,0
49,6
55,5
61,8
68,5
74,9
80,8
85,8
89,4
92,3
94,2
95,5
96,2
96,7
97,4
98,0
98,4
98,8
99,3
99,6
99,7
99,8
99,9
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,7
1,9
3,3
5,1
7,2
10,1
13,8
18,5
23,5
28,5
33,3
39,2
44,8
51,1
58,0
64,1
71,0
76,9
83,0
87,2
90,6
93,1
94,5
96,0
96,4
96,5
96,7
97,2
97,9
98,3
98,7
99,2
99,5
99,6
99,7
99,8
99,9
100,0
0,0
0,0
0,0
0,0
0,0
0,1
0,4
0,9
1,9
3,1
4,5
7,1
10,3
13,9
19,3
24,9
30,5
35,8
41,3
47,2
52,9
58,6
63,3
67,3
71,3
75,1
78,7
82,3
85,9
89,1
92,3
94,6
96,6
98,3
99,4
99,8
99,9
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,2
0,6
1,2
3,7
7,0
10,5
14,4
20,4
25,8
33,0
36,2
40,9
45,4
49,9
53,5
57,4
59,6
62,0
64,2
66,8
72,1
77,4
81,5
87,0
92,3
95,5
98,5
99,7
99,9
100,0
100,0
100,0
100,0
100,0
100,0
Design Siemens Design Orascom Supply Siemens Supply Orascom Civil Construction Orascom M-E Erection Siemens M-E Erection Orascom Commissioning Siemens Commissioning Orascom
Baseline Actual Baseline Actual Baseline Actual Baseline Actual Baseline Actual Baseline Actual Baseline Actual Baseline Actual Baseline Actual
0,0
0,0
0,0
0,0
0,5
8,8
24,9
41,4
57,0
69,0
77,7
82,4
84,8
87,3
89,8
91,7
93,9
95,5
96,8
97,8
98,6
99,2
99,8
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,5
8,4
24,3
41,2
56,3
67,7
76,1
80,9
84,3
87,5
89,1
90,8
91,1
92,2
93,0
93,8
94,6
95,2
96,0
96,8
97,7
98,3
98,9
99,4
99,8
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,5
2,5
6,5
11,5
17,8
25,3
35,2
48,2
61,7
72,7
81,2
86,7
91,0
93,0
94,2
95,3
95,6
96,5
97,1
97,4
98,0
98,8
99,1
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
2,1
6,6
17,5
21,4
30,3
35,3
51,3
62,5
74,1
78,5
83,0
86,0
89,2
92,7
93,1
93,9
95,1
96,1
96,6
96,6
97,4
97,9
99,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,6
1,4
2,4
4,0
6,5
9,6
13,4
17,8
22,3
27,8
33,4
39,5
45,4
51,4
57,8
64,5
71,5
78,0
84,2
89,4
93,2
96,2
98,1
99,2
99,7
99,9
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,6
1,4
2,5
4,0
6,1
9,0
12,9
18,0
23,3
28,7
33,9
40,3
46,3
53,1
60,6
67,3
74,6
81,0
86,6
91,0
94,6
97,1
98,4
99,5
99,8
99,9
99,9
99,9
99,9
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,5
1,5
3,0
4,3
5,6
10,3
16,5
23,3
33,0
43,8
52,7
59,9
67,3
74,6
80,8
87,4
91,5
93,3
94,8
95,9
96,7
97,4
98,0
98,6
99,1
99,4
99,6
99,8
99,9
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,1
0,2
0,7
1,2
1,5
6,5
14,7
21,2
29,7
38,3
45,7
62,0
67,1
73,8
80,9
86,0
86,9
89,7
90,2
91,9
93,4
95,3
96,2
97,0
97,9
98,8
99,6
99,8
99,9
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,6
1,0
2,0
3,6
6,3
9,0
12,3
15,8
19,6
23,6
27,6
34,0
42,5
51,2
59,7
67,2
73,4
79,6
85,6
91,1
94,0
95,6
96,8
97,8
98,6
99,1
99,7
99,8
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,3
1,0
1,5
4,4
8,2
10,0
17,6
25,9
30,7
35,1
42,5
48,3
55,3
61,9
64,7
69,2
71,7
73,7
76,6
83,2
88,3
91,3
95,7
99,8
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
2,2
4,4
6,5
13,1
26,0
36,7
41,4
43,9
46,4
54,9
61,6
62,3
67,2
77,5
84,0
86,6
90,9
94,0
95,2
95,8
99,2
100,0
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
8,5
6,0
10,4
5,8
14,2
33,3
37,5
37,5
37,5
39,0
55,1
68,5
79,4
90,5
92,6
92,6
96,7
98,7
98,7
98,7
99,7
99,7
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
1,5
2,8
4,3
5,9
8,4
12,2
17,2
22,7
27,9
33,2
38,9
45,8
53,4
61,2
68,8
76,0
82,7
87,8
92,6
96,4
98,6
99,6
99,9
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
1,5
2,8
4,3
5,2
6,3
8,3
10,5
13,7
17,8
23,5
26,1
29,1
32,2
35,8
44,9
54,6
62,5
72,6
82,4
89,7
96,9
99,6
99,9
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,3
0,8
1,9
6,9
13,4
17,3
19,6
21,8
25,3
27,7
31,2
34,7
42,0
52,9
62,8
69,8
78,9
87,4
91,9
95,0
96,8
98,2
99,3
99,9
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
2,0
18,4
21,0
22,9
25,8
27,9
36,3
37,4
37,8
40,8
49,4
62,3
68,6
76,4
85,3
90,2
92,1
94,8
96,7
98,5
99,4
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
1,0
4,0
7,5
13,1
19,2
27,8
32,1
37,6
43,1
47,3
50,6
53,8
61,0
64,8
74,0
79,2
82,1
89,0
95,9
98,0
99,4
100,0
100,0
100,0
100,0
100,0
100,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
4,2
14,3
16,3
19,3
22,6
23,4
28,8
35,5
38,5
52,8
67,0
77,0
84,9
92,0
99,4
100,0
100,0
100,0
100,0
100,0
100,0
Okt 17
Jun 15
Commissioning Consortium
Mai 15
M+E Erection Consortium
Apr 15
Civil + Construction Consortium
Mrz 15
Supply Consortium
Feb 15
Design Consortium
Jan 15
WTG
%
100,0% 60,7% 39,4%
1,4% 3,1% 55,7% 11,8% 8,3% 0,2% 15,3% 3,3% 0,8%
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Layout Name : EG1019_Level2
Activity Name
WHOLE PLANT / GENERAL ACTIVITIES Key Dates / Interface Events with Client General GENERAL
Dur.
Start
Finish
1568d
01-Apr-15 A
16-Jul-19
1568d
01-Apr-15 A
16-Jul-19
580d
01-Apr-15 A
01-Nov-16 A 01-Nov-16 A
580d
01-Apr-15 A
SI--U--5-01
ACCESS TO SITE FOR SOIL INVESTIGATION
0d
01-Apr-15 A
SI-----2A00
START OF PROJECT
0d
18-Mai-15 A
SI-----2C00
START ENGINEERING (SIEMENS)
0d
01-Jun-15 A
OC-----2C00
START ENGINEERING (CONSORTIUM PARTNER)
0d
28-Aug-15 A
SI----2-15
CUSTOMER KICK-OFF MEETING
0d
07-Sep-15 A
SI--U--5-02
FORMAL TAKING OVER OF SITE FROM CLIENT / ACCESS TO SITE
0d
15-Sep-15 A
SI----2-10
Start Date (EPC CONTRACT)
0d
31-Mrz-16 A
SI--EK-8-40
FUEL GAS REQUIRED
0d
09-Sep-16 A
SI--A--8-40
HV GRID REQUIRED (FOR BACK ENERGIZING)
0d
01-Nov-16 A
930d
29-Dez-16 A
145d
29-Dez-16 A
Block 4 UNIT 42
ACCESS TO SITE FOR SOIL INVESTIGATION START OF PROJECT START ENGINEERING (SIEMENS) START ENGINEERING (CONSORTIUM PARTNER) CUSTOMER KICK-OFF MEETING FORMAL TAKING OVER OF SITE FROM CLIENT / ACCESS TO SITE Start Date (EPC CONTRACT) FUEL GAS REQUIRED HV GRID REQUIRED (FOR BACK ENERGIZING) 16-Jul-19 22-Mai-17 A
SI42MKA9-40&
POWER TO THE GRID UNIT 42 (AMENDMENT I)
0d
29-Dez-16 A
SI42MB-9-95B
EARLY FINISH DATE G T42
0d
09-Mai-17 A
SI42MB-9-95
TOAC DATE GT42 (AMENDMENT I)
0d
22-Mai-17 A
118d
UNIT 41
22-Jan-17 A
POWER TO THE GRID UNIT 41 (AMENDMENT I)
0d
22-Jan-17 A
SI41MB-9-95B
EARLY FINISH DATE G T41
0d
18-Mai-17 A
SI41MB-9-95
TOAC DATE GT41 (AMENDMENT I)
0d
20-Mai-17 A
244d
14-Nov-18
POWER TO THE GRID BLOCK 40 (AMENDMENT I)
0d
14-Nov-18*
SI4---9-95B
EARLY FINISH DATE B LOCK 40
0d
25-Mrz-19
SI4---9-95
TOAC DATE BLOCK 40 (AMENDMENT I)
0d
16-Jul-19*
861d
13-Jan-17 A
109d
13-Jan-17 A
0d
13-Jan-17 A
SI32MB-9-95B
EARLY FINISH DATE G T32
0d
19-Apr-17 A
SI32MB-9-95
TOAC DATE GT32 (AMENDMENT I)
0d
02-Mai-17 A 15-Jan-17 A
POWER TO THE GRID UNIT 31 (AMENDMENT I)
0d
15-Jan-17 A
SI31MB-9-9B
EARLY FINISH DATE G T31
0d
18-Mai-17 A
SI31MB-9-95
TOAC DATE GT31 (AMENDMENT I)
0d
22-Mai-17 A
210d
25-Okt-18
POWER TO THE GRID BLOCK 30 (AMENDMENT I)
0d
25-Okt-18*
SI3---9-95B
EARLY FINISH DATE B LOCK 30
0d
04-Mrz-19
SI3---9-95
TOAC DATE BLOCK 30 (AMENDMENT I)
0d
23-Mai-19*
647d
31-Mai-17 A
243d
31-Mai-17 A
0d
31-Mai-17 A
SI22MB-9-95B
EARLY FINISH DATE G T22
0d
11-Sep-17
SI22MB-9-95
TOAC DATE GT22 (AMENDMENT I)
0d
29-Jan-18* 31-Mai-17 A
POWER TO THE GRID UNIT 21 (AMENDMENT I)
0d
31-Mai-17 A
SI21MB-9-95B
EARLY FINISH DATE G T21
0d
05-Sep-17
SI21MB-9-95
TOAC DATE GT21 (AMENDMENT I)
0d
30-Jan-18*
209d
11-Aug-18
TOAC DATE BLOCK 40 (AMENDMENT I)
POWER TO THE GRID UNIT 32 (AMENDMENT I) EARLY FINISH DATE G T32 TOAC DATE GT32 (AMENDMENT I)
POWER TO THE GRID UNIT 31 (AMENDMENT I) EARLY FINISH DATE G T31 TOAC DATE GT31 (AMENDMENT I)
POWER TO THE GRID BLOCK 30 (AMENDMENT I) EARLY FINISH DATE B LOCK 30 TOAC DATE BLOCK 30 (AMENDMENT I)
POWER TO THE GRID UNIT 22 (AMENDMENT I) EARLY FINISH DATE G T22 TOAC DATE GT22 (AMENDMENT I)
30-Jan-18
SI21MKA9-45&
UNIT 20
EARLY FINISH DATE BLOCK 40
29-Jan-18
POWER TO THE GRID UNIT 22 (AMENDMENT I)
245d
POWER TO THE GRID BLOCK 40 (AMENDMENT I)
08-Mrz-19
SI22MKA9-40&
UNIT 21
TOAC DATE GT41 (AMENDMENT I)
23-Mai-19
SI30MKA9-40&
Block 2 UNIT 22
EARLY FINISH DATE G T41
22-Mai-17 A
SI31MKA9-45&
UNIT 30
POWER TO THE GRID UNIT 41 (AMENDMENT I)
02-Mai-17 A
POWER TO THE GRID UNIT 32 (AMENDMENT I)
128d
TOAC DATE GT42 (AMENDMENT I)
23-Mai-19
SI32MKA9-40&
UNIT 31
EARLY FINISH DATE G T42
16-Jul-19
SI40MKA9-40&
Block 3 UNIT 32
POWER TO THE GRID UNIT 42 (AMENDMENT I)
20-Mai-17 A
SI41MKA9-45&
UNIT 40
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 1 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
POWER TO THE GRID UNIT 21 (AMENDMENT I) EARLY FINISH DATE G T21 TOAC DATE GT21 (AMENDMENT I)
08-Mrz-19
SI20MKA9-40&
POWER TO THE GRID BLOCK 20 (AMENDMENT I)
0d
11-Aug-18*
POWER TO THE GRID BLOCK 20 (AMENDMENT I)
SI2---9-95B
EARLY FINISH DATE B LOCK 20
0d
31-Dez-18
EARLY FINISH DATE B LOCK 20
SI2---9-95
TOAC DATE BLOCK 20 (AMENDMENT I)
0d
08-Mrz-19*
Block 1 UNIT 10
144d
15-Jul-18
06-Dez-18
144d
15-Jul-18
06-Dez-18
TOAC DATE BLOCK 20 (AMENDMENT I)
SI10MKA9-40&
POWER TO THE GRID BLOCK 10 (AMENDMENT I)
0d
15-Jul-18*
SI1---9-95B
EARLY FINISH DATE B LOCK 10
0d
06-Dez-18
EARLY FINISH DATE B LOCK 10
SI1---9-95
TOAC DATE BLOCK 10 (AMENDMENT I)
0d
06-Dez-18*
TOAC DATE BLOCK 10 (AMENDMENT I)
Time Impact I (By Owner) General GENERAL
38d
27-Jul-15 A
03-Sep-15 A
38d
27-Jul-15 A
03-Sep-15 A
38d
27-Jul-15 A
03-Sep-15 A
EE--U--5-03
OWNER'S INSTRUCTION TO STOP WORK (UNCLEAR SITE COORDINATES) 0d 27-Jul-15 A
EE--U--5-04
DOWN TIME
EE--U--5-05
OWNER'S VERBAL INSTRUCTION TO CONTINUE WORKS
Time Impact II (By Owner) General
POWER TO THE GRID BLOCK 10 (AMENDMENT I)
OWNER'S INSTRUCTION TO STOP WORK (UNCLEAR SITE COORDINATES)
38d
27-Jul-15 A
0d
03-Sep-15 A
35d
02-Sep-15 A
06-Okt-15 A
35d
02-Sep-15 A
06-Okt-15 A
DOWN TIME
02-Sep-15 A
OWNER'S VERBAL INSTRUCTION TO CONTINUE WORKS
ENGINEERING
ACTUAL
MANUFACTURING
CRITICAL
TRANSPORT
SUMMARY
ERECTION
BASELINE
Date
EG1019-0U
Integrated Project Schedule Burullus CCPP Project 4 x SCC5-8000 MS 2x1
CONSTRUCTION COMMISSIONING
Target1: Baseline Program; Target2: Impacted Baseline Program
Revision
Checked
Approved
12-01-16 Rev00 (Richt/Naguib/Naeem)
de Comtes/Nabil Hofmann/Morrison
03-Jun-... Rev0S (Richt/Nabil)
de Comtes/Nabil Huebinger/Morrison
07-Jul-17 Rev0T (Richt/Nabil)
de Comtes/Nabil Huebinger/Morrison
04-Aug... Rev0U (Richt/Nabil)
de Comtes/Nabil Huebinger/Morrison
PKZ: EG1019 DCC: &ABE020 HANDLING : RESTRICTED
/
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
GENERAL
Layout Name : EG1019_Level2 Dur.
Start
Finish
35d
02-Sep-15 A
06-Okt-15 A
0d
02-Sep-15 A
EE--U--5-06
OWNERS'S REQUEST (GIS RE-LOCATION)
EE--U--5-07
DOWN TIME
12d
02-Sep-15 A
EE--U--5-08
FIXED LOCATION OF GIS (OWNER'S CONFIRMATION OF COORDINATES) 0d
14-Sep-15 A
EE--U--5-09
SOIL INVESTIGATION / LAND FILL GIS AREA (RESULTING FROM RELOCATI 23d ON14-Sep-15 OF GIS) A
Terminal Points with Client General GENERAL
OWNERS'S REQUEST (GIS RE-LOCATION) 13-Sep-15 A
541d
01-Jun-15 A
23-Nov-16 A
541d
01-Jun-15 A
23-Nov-16 A
541d
01-Jun-15 A
23-Nov-16 A
TERMINAL POINT FOR WATER DISCHARGE AVAILABLE
0d
01-Jun-15 A
SI--EKG6A40
TERMINAL POINT GAS READY FOR CONNECTION
0d
18-Aug-16 A
SI--GA-6-40
TERMINAL POINT RAW WATER GA READY FOR CONNECTION
0d
23-Nov-16 A
0d
13-Dez-16 A
13-Dez-16 A
0d
13-Dez-16 A
13-Dez-16 A
0d
13-Dez-16 A
13-Dez-16 A
0d
13-Dez-16 A
849d
25-Apr-15 A
20-Aug-17
849d
25-Apr-15 A
20-Aug-17
849d
25-Apr-15 A
20-Aug-17
849d
25-Apr-15 A
20-Aug-17
100d
12-Mai-15 A
20-Aug-15 A
100d
12-Mai-15 A
20-Aug-15 A
100d
12-Mai-15 A
20-Aug-15 A
34d
12-Mai-15 A
15-Jun-15 A
0d
20-Aug-15 A
762d
16-Jul-15 A
15-Aug-17
762d
16-Jul-15 A
15-Aug-17
762d
16-Jul-15 A
15-Aug-17
81d
16-Jul-15 A
05-Okt-15 A
General GENERAL SI--B--8-50&
MV AVAILABLE (BACK ENERGIZING)
Site Mobilization General GENERAL OC--U--5-10#
PREPARATION JOB SITE, CONSTRUCTION SITE INSTALLATION
Civil Studies General GENERAL OC--3415-15
SOIL INVESTIGATION WORKS
OC--3412-22
SOIL INVESTIGATION REPORT AVAILABLE
General Site Civil Work General GENERAL
DOWN TIME FIXED LOCATION OF GIS (OWNER'S CONFIRMATION OF COORDINATES)
06-Okt-15 A
SI--GM-6B40
Key Dates Electrical/ I&C
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 2 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
SOIL INVESTIGATION / LAND FILL GIS AREA (RESULTING FROM RELOCATION OF GIS)
TERMINAL POINT FOR WATER DISCHARGE AVAILABLE TERMINAL POINT GAS READY FOR CONNECTION TERMINAL POINT RAW WATER GA READY FOR CONNECTION
MV AVAILABLE (BACK ENERGIZING)
PREPARATION JOB SITE, CONSTRUCTION SITE INSTALLATION
SOIL INVESTIGATION WORKS SOIL INVESTIGATION REPORT AVAILABLE
OC-U--5-25#1
SITE LEVELING AND BACKFILLING GIS B UILDING
OC-U--5-25#2
SITE LEVELING AND BACKFILLING BLOCK 4
212d
01-Aug-15 A
29-Feb-16 A
SITE LEVELING AND BACKFILLING BLOCK 4
OC-U--5-25#3
SITE LEVELING AND BACKFILLING BLOCK 3
167d
15-Sep-15 A
29-Feb-16 A
SITE LEVELING AND BACKFILLING BLOCK 3
OC-U--5-25#4
SITE LEVELING AND BACKFILLING BOP
382d
04-Nov-15 A
20-Nov-16 A
OC-U--5-25#5
SITE LEVELING AND BACKFILLING BLOCK 2
115d
04-Nov-15 A
27-Feb-16 A
SITE LEVELING AND BACKFILLING BLOCK 2
OC-U--5-25#6
SITE LEVELING AND BACKFILLING BLOCK 1
100d
19-Nov-15 A
27-Feb-16 A
SITE LEVELING AND BACKFILLING BLOCK 1
OC00UBZ5H10
DUCTING STRUCUTRE PART 11/11 SUMMARY
192d
13-Mrz-16 A
21-Sep-16 A
OC00UBZ5H
DUCTING STRUCUTRE PART 1/11 SUMMARY
481d
24-Mrz-16 A
18-Jul-17 A
OC00UBZ5H5
DUCTING STRUCUTRE PART 6/11 SUMMARY
294d
27-Mrz-16 A
15-Jan-17 A
OC00UBZ5H1
DUCTING STRUCUTRE PART 2/11 SUMMARY
364d
06-Apr-16 A
05-Apr-17 A
OC00UBZ5H4
DUCTING STRUCUTRE PART 5/11 SUMMARY
492d
11-Apr-16 A
15-Aug-17
OC00UBZ5H3
DUCTING STRUCUTRE PART 4/11 SUMMARY
256d
13-Apr-16 A
25-Dez-16 A
OC00UBZ5H2
DUCTING STRUCUTRE PART 3/11 SUMMARY
273d
04-Mai-16 A
01-Feb-17 A
OC00UBZ5H8
DUCTING STRUCUTRE PART 9/11 SUMMARY
288d
02-Jul-16 A
15-Apr-17 A
OC00UBZ5H6
DUCTING STRUCUTRE PART 7/11 SUMMARY
297d
18-Jul-16 A
10-Mai-17 A
OC00UBZ5H9
DUCTING STRUCUTRE PART 10/11 SUMMARY
272d
26-Jul-16 A
24-Apr-17 A
OC00UBZ5H7
DUCTING STRUCUTRE PART 8/11 SUMMARY
328d
27-Jul-16 A
20-Jun-17 A
64d
01-Aug-16 A
03-Okt-16 A
COMMON OC00UBZ5H18
DUCTING STRUCUTRE AREA 5 - 6
Block 4 GENERAL
64d
01-Aug-16 A
03-Okt-16 A
186d
13-Apr-16 A
16-Okt-16 A
SITE LEVELING AND BACKFILLING GIS BUILDING
SITE LEVELING AND BACKFILLING BOP
DUCTING STRUCUTRE PART 11/11 SUMMARY DUCTING STRUCUTRE PART 1/11 SUMMARY DUCTING STRUCUTRE PART 6/11 SUMMARY DUCTING STRUCUTRE PART 2/11 SUMMARY DUCTING STRUCUTRE PART 5/11 SUMMARY DUCTING STRUCUTRE PART 4/11 SUMMARY DUCTING STRUCUTRE PART 3/11 SUMMARY DUCTING STRUCUTRE PART 9/11 SUMMARY DUCTING STRUCUTRE PART 7/11 SUMMARY DUCTING STRUCUTRE PART 10/11 SUMMARY DUCTING STRUCUTRE PART 8/11 SUMMARY
DUCTING STRUCUTRE AREA 5 - 6
186d
13-Apr-16 A
16-Okt-16 A
OC00UBZ5H11
DUCTING STRUCUTRE AREA 1
177d
13-Apr-16 A
07-Okt-16 A
DUCTING STRUCUTRE AREA 1
OC00UBZ5H19
DUCTING STRUCUTRE AREA 4
182d
13-Apr-16 A
12-Okt-16 A
DUCTING STRUCUTRE AREA 4
OC00UBZ5H20
DUCTING STRUCUTRE AREA 7
186d
13-Apr-16 A
16-Okt-16 A
DUCTING STRUCUTRE AREA 7
178d
04-Mai-16 A
29-Okt-16 A
Block 3 GENERAL
178d
04-Mai-16 A
29-Okt-16 A
OC00UBZ5H21
DUCTING STRUCUTRE AREA 2
169d
04-Mai-16 A
20-Okt-16 A
OC00UBZ5H22
DUCTING STRUCUTRE AREA 8
178d
04-Mai-16 A
29-Okt-16 A
525d
06-Okt-15 A
14-Mrz-17 A
525d
06-Okt-15 A
14-Mrz-17 A
525d
06-Okt-15 A
14-Mrz-17 A
525d
06-Okt-15 A
14-Mrz-17 A
183d
09-Mrz-17 A
07-Sep-17
183d
09-Mrz-17 A
07-Sep-17
183d
09-Mrz-17 A
07-Sep-17
7d
09-Mrz-17 A
15-Mrz-17 A
96d
05-Apr-17 A
10-Jul-17 A
121d
10-Mai-17 A
07-Sep-17
348d
21-Aug-17
03-Aug-18
348d
21-Aug-17
03-Aug-18
348d
21-Aug-17
03-Aug-18
320d
21-Aug-17
06-Jul-18
28d
07-Jul-18*
03-Aug-18
1099d
01-Jun-15 A
03-Jun-18
301d
05-Sep-15 A
02-Jul-16 A
91d
05-Sep-15 A
04-Dez-15 A
Piling for Entire Plant General GENERAL OC--U--5-00#
PILING WHOLE PLANT
Civil Works UYE General COMMON OC00UYE5-15
CONSTRUCTION FOUNDATION UYE
OC00UYE5C15
CONSTRUCTION MASONRY UYE
OC00UYE5D15
CONSTRUCTION FINISHING WORKS UYE
Roads, Parking Area, Walkways, Hardstanding areas UZA General COMMON OC00UZA5-16
EXECUTION ROADS AND DRAINAGE UZA
OC00UZA5D15
FINISHING WORKS UZA
GAS TURBINE AREA Turboset Foundation UMB General
DUCTING STRUCUTRE AREA 2 DUCTING STRUCUTRE AREA 8
PILING WHOLE PLANT
CONSTRUCTION FOUNDATION UYE CONSTRUCTION MASONRY UYE CONSTRUCTION FINISHING WORKS UYE
EXECUTION ROADS AND DRAINAGE UZA FINISHING WORKS UZA
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
Dur.
Start
Finish
91d
05-Sep-15 A
04-Dez-15 A
DETAIL DESIGN, CHECKER CONCRETE STRUCTURE TS FOUNDATION 91d UMB 05-Sep-15 A
04-Dez-15 A
GENERAL SI--UMB2A70
Layout Name : EG1019_Level2
66d
15-Dez-15 A
19-Feb-16 A
46d
04-Jan-16 A
19-Feb-16 A
46d
04-Jan-16 A
19-Feb-16 A
0d
16-Jan-16 A
51d
15-Dez-15 A
04-Feb-16 A
51d
15-Dez-15 A
04-Feb-16 A
0d
31-Dez-15 A
51d
02-Jan-16 A
22-Feb-16 A
44d
02-Jan-16 A
15-Feb-16 A
44d
02-Jan-16 A
15-Feb-16 A
0d
18-Jan-16 A
38d
15-Jan-16 A
22-Feb-16 A
38d
15-Jan-16 A
22-Feb-16 A
0d
28-Jan-16 A
86d
22-Feb-16 A
18-Mai-16 A
61d
22-Feb-16 A
23-Apr-16 A
61d
22-Feb-16 A
23-Apr-16 A
0d
04-Mrz-16 A
34d
14-Apr-16 A
18-Mai-16 A
34d
14-Apr-16 A
18-Mai-16 A
0d
19-Apr-16 A
82d
11-Apr-16 A
02-Jul-16 A
71d
11-Apr-16 A
21-Jun-16 A
71d
11-Apr-16 A
21-Jun-16 A
0d
22-Apr-16 A
61d
02-Mai-16 A
02-Jul-16 A
61d
02-Mai-16 A
02-Jul-16 A
0d
12-Mai-16 A
680d
06-Okt-15 A
15-Aug-17
51d
06-Okt-15 A
26-Nov-15 A
51d
06-Okt-15 A
26-Nov-15 A
51d
06-Okt-15 A
26-Nov-15 A
24-Nov-15 A
30-Apr-17 A
OC4-UMB5-15#
523d 7h 510d 7h SUMMARY BUILDING FOUNDATION 41/42UMB (INCL.EXCAVATION) 79d
OC4-UMB5-10
(H) START PLACING FORMWORK BUILD.FOUNDATION 41/42UMB
16-Jan-16 A
OC4-UMB5C55
(RFE) READY FOR E-ERECTION, BUILDING CLOSED 41/42UMB
Block 4 UNIT 42 OC42UMB5A15#
SUMMARY TURBOSET FOUNDATION 42UMB (INCL.E XCAVATION)
OC42UMB5A10
(H) START PLACING FORMWORK GT- SET FOUNDATION 42UMB
UNIT 41 OC41UMB5A15#
SUMMARY TURBOSET FOUNDATION 41UMB (INCL.E XCAVATION)
OC41UMB5A10
(H) START PLACING FORMWORK GT- SET FOUNDATION 41UMB
Block 3 UNIT 32 OC32UMB5A15#
SUMMARY TURBOSET FOUNDATION 32UMB (INCL.E XCAVATION)
OC32UMB5A10
(H) START PLACING FORMWORK GT- SET FOUNDATION 32UMB
UNIT 31 OC31UMB5A15#
SUMMARY TURBOSET FOUNDATION 31UMB (INCL.E XCAVATION)
OC31UMB5A10
(H) START PLACING FORMWORK GT- SET FOUNDATION 31UMB
Block 2 UNIT 22 OC22UMB5A15#
SUMMARY TURBOSET FOUNDATION 22UMB (INCL.E XCAVATION)
OC22UMB5A10
(H) START PLACING FORMWORK GT- SET FOUNDATION 22UMB
UNIT 21 OC21UMB5A15#
SUMMARY TURBOSET FOUNDATION 21UMB (INCL.E XCAVATION)
OC21UMB5A10
(H) START PLACING FORMWORK GT- SET FOUNDATION 21UMB
Block 1 UNIT 11 OC11UMB5A15#
SUMMARY TURBOSET FOUNDATION 11UMB (INCL.EXCAVATION)
OC11UMB5A10
(H) START PLACING FORMWORK GT- SET FOUNDATION 11UMB
UNIT 12 OC12UMB5A15#
SUMMARY TURBOSET FOUNDATION 12UMB (INCL.E XCAVATION)
OC12UMB5A10
(H) START PLACING FORMWORK GT- SET FOUNDATION 12UMB
Civil Works UMB General GENERAL OC--UMB2-70
Block 4 GENERAL
DETAIL DESIGN, CHECKER CONCRETE STRUCTURE UMB
UNIT 42
0d
OC42UMB5B25
ERECTION STEEL STRUCTURE ANNEX 42UMB
117d
01-Mrz-16 A
25-Jun-16 A
OC42UMB5C15
WALL AND ROOF CLADDING 42UMB
324d
15-Mai-16 A
04-Apr-17 A
OC42UMB5I26
ERECTION STEEL STRUCTURE FILTERHOUSE 42UMB
14d
18-Jul-16 A
01-Aug-16 A
OC42UMB5E15#
SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 42UMB
134d
23-Jul-16 A
03-Dez-16 A
OC42UMB5C45
(RFE) ROOF CLOSED 42UMB [EXCEPT SMALL PORTION OF EAST SIDE]0d
15-Aug-16 A
OC42SMM8B70
(CCC) CRANE SMM04 IN 41/42UMB READY (200t)
15-Sep-16 A
414d
15-Feb-16 A
04-Apr-17 A
ERECTION STEEL STRUCTURE CRANE WALKWAY 41UMB
132d
15-Feb-16 A
25-Jun-16 A
OC41UMB5B25
ERECTION STEEL STRUCTURE ANNEX 41UMB
117d
01-Mrz-16 A
25-Jun-16 A
OC41UMB5C15
WALL AND ROOF CLADDING 41UMB
324d
15-Mai-16 A
04-Apr-17 A
OC41UMB5E15#
SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 41UMB
75d
23-Jul-16 A
06-Okt-16 A
OC41UMB5I25
ERECTION STEEL STRUCTURE FILTERHOUSE 41UMB
13d
23-Jul-16 A
05-Aug-16 A
OC41UMB5C45
(RFE) ROOF CLOSED 41UMB [EXCEPT SMALL PORTION OF EAST SIDE]0d
15-Aug-16 A
513d
30-Nov-15 A
25-Apr-17 A
444d
07-Dez-15 A
23-Feb-17 A
88d
07-Dez-15 A
04-Mrz-16 A
0d
23-Dez-15 A
0d
23-Feb-17 A
513d
30-Nov-15 A
OC3-UMB5C55
(RFE) READY FOR E-ERECTION, BUILDING CLOSED 31/32UMB
ERECTION STEEL STRUCTURE ANNEX 42UMB WALL AND ROOF CLADDING 42UMB ERECTION STEEL STRUCTURE FILTERHOUSE 42UMB SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 42UMB
(CCC) CRANE SMM04 IN 41/42UMB READY (200t)
ERECTION STEEL STRUCTURE CRANE WALKWAY 41UMB ERECTION STEEL STRUCTURE ANNEX 41UMB WALL AND ROOF CLADDING 41UMB SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 41UMB ERECTION STEEL STRUCTURE FILTERHOUSE 41UMB
SUMMARY BUILDING FOUNDATION 31/32UMB (INCL.EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION 31/32UMB (RFE) READY FOR E-ERECTION, BUILDING CLOSED 31/32UMB
25-Apr-17 A
FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE 183dCRANE 30-Nov-15 WALKW. A UMB 31-Mai-16 BLOCK A 3
OC32UMB5B15
ERECTION STEEL STRUCTURE CRANE WALKWAY 32UMB
137d
09-Mrz-16 A
24-Jul-16 A
OC32UMB5B25
ERECTION STEEL STRUCTURE ANNEX 32UMB
112d
02-Apr-16 A
23-Jul-16 A
OC32UMB5C15
WALL AND ROOF CLADDING 32UMB
311d
19-Jun-16 A
25-Apr-17 A
OC32UMB5I26
ERECTION STEEL STRUCTURE FILTERHOUSE 32UMB
22d
30-Jul-16 A
21-Aug-16 A
OC32UMB5E15#
SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 32UMB
117d
06-Aug-16 A
30-Nov-16 A
OC32SMM8B70
(CCC) CRANE SMM04 IN 31/32UMB (26t)
OC32UMB5C45
(RFE) ROOF CLOSED 32UMB
UNIT 31
ERECTION STEEL STRUCTURE CRANE WALKWAY 42UMB
(RFE) ROOF CLOSED 41UMB [EXCEPT SMALL PORTION OF EAST SIDE]
OC--UMB3B27
0d
FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE CRANE WALKW. UMB BLOCK 4
(RFE) ROOF CLOSED 42UMB [EXCEPT SMALL PORTION OF EAST SIDE]
OC41UMB5B15
UNIT 32
SUMMARY BUILDING FOUNDATION 41/42UMB (INCL.EXCAVATION)
(RFE) READY FOR E-ERECTION, BUILDING CLOSED 41/42UMB
23-Jul-16 A
(H) START PLACING FORMWORK BUILD.FOUNDATION 31/32UMB
DETAIL DESIGN, CHECKER CONCRETE STRUCTURE UMB
04-Apr-17 A
15-Feb-16 A
SUMMARY BUILDING FOUNDATION 31/32UMB (INCL.EXCAVATION)
SUMMARY TURBOSET FOUNDATION 12UMB (INCL.EXCAVATION)
(H) START PLACING FORMWORK BUILD.FOUNDATION 41/42UMB
159d
OC32UMB5-10
SUMMARY TURBOSET FOUNDATION 11UMB (INCL.EXCAVATION)
(H) START PLACING FORMWORK GT- SET FOUNDATION 12UMB
ERECTION STEEL STRUCTURE CRANE WALKWAY 42UMB
OC32UMB5-15#
SUMMARY TURBOSET FOUNDATION 21UMB (INCL.EXCAVATION)
(H) START PLACING FORMWORK GT- SET FOUNDATION 11UMB
FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE 172dCRANE 24-Nov-15 WALKW. A UMB 14-Mai-16 BLOCK A 4
Block 3 GENERAL
SUMMARY TURBOSET FOUNDATION 22UMB (INCL.EXCAVATION)
(H) START PLACING FORMWORK GT- SET FOUNDATION 21UMB
OC42UMB5B15
0d
SUMMARY TURBOSET FOUNDATION 31UMB (INCL.EXCAVATION)
(H) START PLACING FORMWORK GT- SET FOUNDATION 22UMB
OC--UMB3B26
UNIT 41
SUMMARY TURBOSET FOUNDATION 32UMB (INCL.EXCAVATION)
(H) START PLACING FORMWORK GT- SET FOUNDATION 31UMB
30-Apr-17 A
30-Apr-17 A
SUMMARY TURBOSET FOUNDATION 41UMB (INCL.EXCAVATION)
(H) START PLACING FORMWORK GT- SET FOUNDATION 32UMB
24-Feb-16 A
24-Nov-15 A
SUMMARY TURBOSET FOUNDATION 42UMB (INCL.EXCAVATION)
(H) START PLACING FORMWORK GT- SET FOUNDATION 41UMB
07-Dez-15 A
0d
DETAIL DESIGN, CHECKER CONCRETE STRUCTURE TS FOUNDATION UMB
(H) START PLACING FORMWORK GT- SET FOUNDATION 42UMB
07-Dez-15 A
497d
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 3 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
15-Sep-16 A
0d
10-Feb-17 A
413d
09-Mrz-16 A
25-Apr-17 A
FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE CRANE WALKW. UMB BLOCK 3 ERECTION STEEL STRUCTURE CRANE WALKWAY 32UMB ERECTION STEEL STRUCTURE ANNEX 32UMB WALL AND ROOF CLADDING 32UMB ERECTION STEEL STRUCTURE FILTERHOUSE 32UMB SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 32UMB (CCC) CRANE SMM04 IN 31/32UMB (26t) (RFE) ROOF CLOSED 32UMB
OC31UMB5B15
ERECTION STEEL STRUCTURE CRANE WALKWAY 31UMB
137d
09-Mrz-16 A
24-Jul-16 A
OC31UMB5B25
ERECTION STEEL STRUCTURE ANNEX 31UMB
112d
02-Apr-16 A
23-Jul-16 A
OC31UMB5C15
WALL AND ROOF CLADDING 31UMB
311d
19-Jun-16 A
25-Apr-17 A
OC31UMB5I25
ERECTION STEEL STRUCTURE FILTERHOUSE 31UMB
24d
07-Aug-16 A
31-Aug-16 A
ERECTION STEEL STRUCTURE CRANE WALKWAY 31UMB ERECTION STEEL STRUCTURE ANNEX 31UMB WALL AND ROOF CLADDING 31UMB ERECTION STEEL STRUCTURE FILTERHOUSE 31UMB
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Layout Name : EG1019_Level2
Activity Name
Dur.
Start
Finish
OC31UMB5E15#
SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 31UMB
122d
07-Aug-16 A
06-Dez-16 A
OC31UMB5C45
(RFE) ROOF CLOSED 31UMB
0d
10-Feb-17 A
563d
26-Jan-16 A
10-Aug-17
434d
22-Feb-16 A
01-Mai-17 A
95d
22-Feb-16 A
26-Mai-16 A
0d
03-Apr-16 A
Block 2 GENERAL OC2-UMB5-15#
SUMMARY BUILDING FOUNDATION 21/22UMB (INCL.EXCAVATION)
OC2-UMB5-10
(H) START PLACING FORMWORK BUILD.FOUNDATION 21/22UMB
OC2-UMB5C55
(RFE) READY FOR E-ERECTION, BUILDING CLOSED 21/22UMB
UNIT 22
0d
01-Mai-17 A
563d
26-Jan-16 A
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 4 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 31UMB (RFE) ROOF CLOSED 31UMB
SUMMARY BUILDING FOUNDATION 21/22UMB (INCL.EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION 21/22UMB (RFE) READY FOR E-ERECTION, BUILDING CLOSED 21/22UMB
10-Aug-17 FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE CRANE WALKW. UMB BLOCK 2
OC--UMB3B28
FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE 233dCRANE 26-Jan-16 WALKW. A UMB 15-Sep-16 BLOCK 2 A
OC22UMB5B15
ERECTION STEEL STRUCTURE INCL. CRANE WALKWAY 22UMB
305d
22-Mai-16 A
22-Mrz-17 A
OC22UMB5B25
ERECTION STEEL STRUCTURE ANNEX 22UMB
199d
22-Mai-16 A
07-Dez-16 A
OC22UMB5C15
WALL AND ROOF CLADDING 22UMB
269d
15-Nov-16 A
10-Aug-17
OC22UMB5E15#
SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 22UMB
103d
07-Jan-17 A
19-Apr-17 A
OC22UMB5I26
PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 22UMB 29d
07-Feb-17 A
08-Mrz-17 A
PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 22UMB
OC22SMM8B70
(CCC) CRANE SMM04 IN 21/22UMB (26t)
0d
09-Mrz-17 A
(CCC) CRANE SMM04 IN 21/22UMB (26t)
OC22UMB5C45
(RFE) ROOF CLOSED 22UMB
0d
25-Mrz-17 A
446d
22-Mai-16 A
UNIT 21
(RFE) ROOF CLOSED 22UMB
ERECTION STEEL STRUCTURE INCL. CRANE WALKWAY 21UMB
302d
22-Mai-16 A
19-Mrz-17 A
OC21UMB5B25
ERECTION STEEL STRUCTURE ANNEX 21UMB
134d
18-Aug-16 A
30-Dez-16 A
OC21UMB5C15
WALL AND ROOF CLADDING 21UMB
269d
15-Nov-16 A
10-Aug-17
OC21UMB5E15#
SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 21UMB
103d
07-Jan-17 A
19-Apr-17 A
OC21UMB5I25
PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 21UMB 17d
19-Feb-17 A
08-Mrz-17 A
OC21UMB5C45
(RFE) ROOF CLOSED 21UMB
0d
18-Apr-17 A
568d
26-Jan-16 A
ERECTION STEEL STRUCTURE INCL. CRANE WALKWAY 21UMB ERECTION STEEL STRUCTURE ANNEX 21UMB WALL AND ROOF CLADDING 21UMB SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 21UMB PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 21UMB (RFE) ROOF CLOSED 21UMB
15-Aug-17
414d
04-Apr-16 A
23-Mai-17 A
OC1-UMB5-15#
SUMMARY BUILDING FOUNDATION 11/12UMB (INCL.EXCAVATION)
74d
04-Apr-16 A
17-Jun-16 A
OC1-UMB5-10
(H) START PLACING FORMWORK BUILD.FOUNDATION 11/12UMB
0d
13-Apr-16 A
OC12UMB5C55
(RFE) READY FOR E-ERECTION, BUILDING CLOSED 11/12UMB
0d
23-Feb-17 A
OC12SMM8B70
(CCC) CRANE SMM04 IN 11/12UMB (26t)
0d
UNIT 11
WALL AND ROOF CLADDING 22UMB SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 22UMB
10-Aug-17
OC21UMB5B15
Block 1 GENERAL
ERECTION STEEL STRUCTURE INCL. CRANE WALKWAY 22UMB ERECTION STEEL STRUCTURE ANNEX 22UMB
SUMMARY BUILDING FOUNDATION 11/12UMB (INCL.EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION 11/12UMB (RFE) READY FOR E-ERECTION, BUILDING CLOSED 11/12UMB
23-Mai-17 A
408d
28-Jun-16 A
09-Aug-17
(CCC) CRANE SMM04 IN 11/12UMB (26t)
OC11UMB5B15
ERECTION STEEL STRUCTURE CRANE WALKWAY 11UMB
336d
28-Jun-16 A
29-Mai-17 A
OC11UMB5B25
ERECTION STEEL STRUCTURE ANNEX 11UMB
220d
12-Aug-16 A
19-Mrz-17 A
OC11UMB5C15
WALL AND ROOF CLADDING 11UMB
187d
04-Feb-17 A
09-Aug-17
OC11UMB5C45
(RFE) ROOF CLOSED 11UMB
0d
28-Apr-17 A
OC11UMB5E15#
SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 11UMB
91d
07-Mai-17 A
05-Aug-17
OC11UMB5B47
CUTTING REMAINING STEEL BARS ANNEX 11UMB
7d
19-Mai-17 A
25-Mai-17 A
CUTTING REMAINING STEEL BARS ANNEX 11UMB
OC11UMB5I25
PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 11UMB 5d
19-Mai-17 A
24-Mai-17 A
PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 11UMB
568d
26-Jan-16 A
15-Aug-17
UNIT 12
FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE 247dCRANE 26-Jan-16 WALKW. A UMB 28-Sep-16 BLOCK 1 A
OC12UMB5B15
ERECTION STEEL STRUCTURE CRANE WALKWAY 12UMB
336d
28-Jun-16 A
29-Mai-17 A
OC12UMB5B25
ERECTION STEEL STRUCTURE ANNEX 12UMB
217d
02-Aug-16 A
06-Mrz-17 A
OC12UMB5C15
WALL AND ROOF CLADDING 12UMB
193d
04-Feb-17 A
15-Aug-17
OC12UMB5B46
CUTTING REMAINING STEEL BARS ANNEX 12UMB
7d
25-Apr-17 A
01-Mai-17 A
OC12UMB5C45
(RFE) ROOF CLOSED 12UMB
0d
28-Apr-17 A
OC12UMB5E15#
SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 12UMB
89d
09-Mai-17 A
05-Aug-17
OC12UMB5I26
PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 12UMB 5d
19-Mai-17 A
24-Mai-17 A
881d
01-Jun-15 A
28-Okt-17
767d
01-Jun-15 A
06-Jul-17 A
Block 4 UNIT 42
WALL AND ROOF CLADDING 11UMB (RFE) ROOF CLOSED 11UMB
OC--UMB3B29
Gas Turbine MB-
ERECTION STEEL STRUCTURE CRANE WALKWAY 11UMB ERECTION STEEL STRUCTURE ANNEX 11UMB
SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 11UMB
FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE CRANE WALKW. UMB BLOCK 1 ERECTION STEEL STRUCTURE CRANE WALKWAY 12UMB ERECTION STEEL STRUCTURE ANNEX 12UMB WALL AND ROOF CLADDING 12UMB CUTTING REMAINING STEEL BARS ANNEX 12UMB (RFE) ROOF CLOSED 12UMB SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 12UMB PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 12UMB
767d
01-Jun-15 A
06-Jul-17 A
SP42MB-3-25
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 42MB- 303d
01-Jun-15 A
29-Mrz-16 A
SI42MBA4-25
TRANSPORT GT42 MB NS P - SITE
26d
24-Apr-16 A
20-Mai-16 A
OC42MB-6-20#
SUMMARY INS TALLATION GT42
188d
18-Mai-16 A
22-Nov-16 A
SI42MB-6-10
PLACING GT42
0d
10-Jun-16 A
OC42MB-6-55
OIL FLUSHING AND RE-INSTATEMENT GT 42
31d
19-Aug-16 A
19-Sep-16 A
SI42MB-8-25#
COLD COMMISSIONING GT42 / AUXILIARIES
30d
26-Nov-16 A
25-Dez-16 A
SI42MB-9-05
1ST. TURNING GEAR GT42
0d
26-Dez-16 A
SI42MBY9-36
SYSTEM CHECK BY SIEMENS GT42
0d
26-Dez-16 A
26-Dez-16 A
SI42MKA9-10
START UP TES T WITH MBJ 42MBA/SFC COMMISSIONING / MBP GAS FILLING 1d 27-Dez-16 A
27-Dez-16 A
START UP TES T WITH MBJ 42MBA/SFC COMMISSIONING / MBP GAS FILLING
SI42MBY9-35
GT PROTECTION GT42
1d
27-Dez-16 A
27-Dez-16 A
GT PROTECTION GT42
SI42MB-9-15
1ST. IGNITION GT42
0d
28-Dez-16 A
SI42MKA9-40
1ST. SYNCHRONIZATION GT GENERATOR 42MKA (POWER TO THE GRID) 0d
SI42MB-9-00
HOT COMMISSIONING GT42 / OPEN CYCLE
7d
08-Feb-17 A
15-Feb-17 A
SI42MBA9-70
OPTIMIZING UNIT 42
0d
15-Feb-17 A
15-Feb-17 A
SI42MB-9-001
OUTAGE (PRIOR TO PERFORMANCE TEST)
12d
18-Feb-17 A
01-Mrz-17 A
SI42MBA9-80
PERFORMANCE TEST GT 42
SI42MB-9-002
OUTAGE (PRIOR TO READY FOR RELIABILTY RUN)
SI42MB-9-005
BALANCING LOADS GT42
SI42MB-9-004
OUTAGE (RELIABILITY RUN - WAITING FOR OWNER GO AHEAD)
SI42MB-9-003
UNIT 42 READY FOR RELIAB ILITY RUN
SI42MBA9-90 SI42OC-9-44
UNIT 41
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 42MBTRANSPORT GT42 MB NSP - SITE SUMMARY INSTALLATION GT42 PLACING GT42 OIL FLUSHING AND RE-INSTATEMENT GT 42 COLD COMMISSIONING GT42 / AUXILIARIES 1ST. TURNING GEAR GT42 SYSTEM CHECK BY SIEMENS GT42
1ST. IGNITION GT42 29-Dez-16 A
1ST. SYNCHRONIZATION GT GENERATOR 42MKA (POWER TO THE GRID) HOT COMMISSIONING GT42 / OPEN CYCLE OPTIMIZING UNIT 42 OUTAGE (PRIOR TO PERFORMANCE TEST)
5d
02-Mrz-17 A
06-Mrz-17 A
10d
07-Mrz-17 A
16-Mrz-17 A
OUTAGE (PRIOR TO READY FOR RELIABILTY RUN) BALANCING LOADS GT42
4d
17-Mrz-17 A
20-Mrz-17 A
16d
21-Mrz-17 A
05-Apr-17 A
0d
21-Mrz-17 A
RELIABILITY RUN GT 42
30d
09-Apr-17 A
08-Mai-17 A
GT42 COMMERCIAL OPEN CYCLE OPERATION
50d
18-Mai-17 A
06-Jul-17 A
767d
01-Jun-15 A
06-Jul-17 A
PERFORMANCE TEST GT 42
OUTAGE (RELIABILITY RUN - WAITING FOR OWNER GO AHEAD) UNIT 42 READY FOR RELIABILITY RUN RELIABILITY RUN GT 42 GT42 COMMERCIAL OPEN CYCLE OPERATION
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
Layout Name : EG1019_Level2 Dur.
Start
Finish
SP41MB-3-25
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 41MB- 322d
01-Jun-15 A
17-Apr-16 A
SI41MBA4-25
TRANSPORT GT 41 MB NSP - SITE
27d
27-Apr-16 A
24-Mai-16 A
OC41MB-6-20#
SUMMARY INS TALLATION GT41
190d
18-Mai-16 A
24-Nov-16 A
SI41MB-6-11
PLACING GT41
0d
27-Mai-16 A
OC41MB-6-55
OIL FLUSHING GT41
31d
18-Aug-16 A
18-Sep-16 A
SI41MB-8-25#
COLD COMMISSIONING GT41 / AUXILIARIES
31d
26-Nov-16 A
26-Dez-16 A
SI41MB-9-05
1ST. TURNING GEAR GT41
0d
27-Dez-16 A
SI41MBY9-36
SYSTEM CHECK BY SIEMENS GT41
1d
27-Dez-16 A
27-Dez-16 A
SI41MB-9-99
SHIFTING 21BAT TO 41BAT
2d
27-Dez-16 A
28-Dez-16 A
SI41MBY9-35
GT PROTECTION GT41
1d
28-Dez-16 A
28-Dez-16 A
SI41MKA9-10
START UP TES T WITH MBJ 41MBA/SFC COMMISSIONING / MBP FILLING1d
29-Dez-16 A
29-Dez-16 A
SI41MB-9-97
TRANSFORMER 41 BAT REPLACEMENT AND RE- CO MMISSIONING
29-Dez-16 A
14-Jan-17 A
SI41BAC8-98
GENERATOR CIRCUIT BREAKER 41 BAC REPLACEMENT AND RE-COMMISSIONING 6d 16-Jan-17 A
21-Jan-17 A
SI41MB-9-15
1ST. IGNITION GT41
SI41MKA9-40
1ST. SYNCHRONIZATION GT GENERATOR 41MKA (POWER TO THE GRID) 0d
SI41MB-9-00
HOT COMMISSIONING GT41 / OPEN CYCLE
SI41MBA9-92
17d
0d
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 41MBTRANSPORT GT 41 MB NSP - SITE SUMMARY INS TALLATION GT41 PLACING GT41 OIL FLUSHING GT41 COLD COMMISSIONING GT41 / AUXILIARIES 1ST. TURNING GEAR GT41 SYSTEM CHECK BY SIEMENS GT41 SHIFTING 21BAT TO 41BAT GT PROTECTION GT41 START UP TES T WITH MBJ 41MBA/SFC COMMISSIONING / MBP FILLING TRANSFORMER 41 BAT REPLACEMENT AND RE- CO MMISSIONIN G GENERATOR CIRCUIT BREAKER 41 BAC REPLACEMENT AND RE-COMMISSIONING
22-Jan-17 A
1ST. IGNITION GT41 22-Jan-17 A
36d
11-Feb-17 A
18-Mrz-17 A
OUTAGE (PRIOR PERFORMANCE TEST)
3d
13-Mrz-17 A
15-Mrz-17 A
SI41MBA9-70
OPTIMIZING UNIT 41
0d
18-Mrz-17 A
18-Mrz-17 A
SI41MBA9-80
PERFORMANCE TEST GT41 (INCL. PREPARATION)
2d
19-Mrz-17 A
20-Mrz-17 A
SI41MBA9-95
OUTAGE (RELIABILITY RUN - WAITING FOR OWNER GO AHEAD)
16d
21-Mrz-17 A
05-Apr-17 A
SI41MBA9-94
UNIT 41 READY FOR RELIAB ILITY RUN
0d
21-Mrz-17 A
SI41MBA9-90
RELIABILITY RUN GT41
30d
09-Apr-17 A
08-Mai-17 A
SI41OC-9-44
GT41 COMMERCIAL OPEN CYCLE OPERATION
50d
18-Mai-17 A
06-Jul-17 A
767d
01-Jun-15 A
06-Jul-17 A
Block 3 UNIT 32
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 5 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
1ST. SYNCHRONIZATION GT GENERATOR 41MKA (POWER TO THE GRID) HOT COMMISSIONING GT41 / OPEN CYCLE OUTAGE (PRIOR PERFORMANCE TEST) OPTIMIZING UNIT 41 PERFORMANCE TEST GT41 (INCL. PREPARATION) OUTAGE (RELIABILITY RUN - WAITING FOR OWNER GO AHEAD) UNIT 41 READY FOR RELIABILITY RUN RELIABILITY RUN GT41 GT41 COMMERCIAL OPEN CYCLE OPERATION
767d
01-Jun-15 A
06-Jul-17 A
SP32MB-3-25
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 32MB- 322d
01-Jun-15 A
17-Apr-16 A
SI32MBA4-25
TRANSPORT GT32 MB NS P - SITE
36d
02-Mai-16 A
06-Jun-16 A
OC32MB-6-20#
SUMMARY INS TALLATION GT32
190d
20-Jun-16 A
26-Dez-16 A
SI32MB-6-11
PLACING GT32
0d
02-Jul-16 A
OC32MB-6-55
OIL FLUSHING GT 32
28d
29-Nov-16 A
26-Dez-16 A
SI32MB-8-25#
COLD COMMISSIONING GT32 / AUXILIARIES
15d
20-Dez-16 A
03-Jan-17 A
SI32MBY9-36
SYSTEM CHECK BY SIEMENS GT32
0d
09-Jan-17 A
09-Jan-17 A
SYSTEM CHECK BY SIEMENS GT32
SI32MBY9-35
GT PROTECTION GT32
1d
09-Jan-17 A
09-Jan-17 A
GT PROTECTION GT32
SI32MKA9-10
START UP TES T WITH MBJ 32MBA/SFC COMMISSIONING / MBP GAS FILLING 2d 09-Jan-17 A
10-Jan-17 A
SI32MB-9-05
1ST. TURNING GEAR GT32
SI32MKA9-40
1ST. SYNCHRONIZATION GT GENERATOR 32MKA (POWER TO THE GRID) 0d
SI32MB-9-15
1ST. IGNITION GT32
SI32MB-9-00
HOT COMMISSIONING GT32 / OPEN CYCLE
SI32MBA9-92
OUTAGE (PRIOR PERFORMANCE TEST)
SI32MBA9-80 SI32MBA9-96 SI32MBA9-93
OUTAGE (PRIOR RELIABILITY RUN)
SI32MBA9-90
RELIABILITY RUN GT 32
SI32OC-9-45
GT32 COMMERCIAL OPEN CYCLE OPERATION
0d
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 32MBTRANSPORT GT32 MB NS P - SITE SUMMARY INS TALLATION GT32 PLACING GT32 OIL FLUSHING GT 32 COLD COMMISSIONING GT32 / AUXILIARIES
START UP TES T WITH MBJ 32MBA/SFC COMMISSIONING / MBP GAS FILLING
10-Jan-17 A
1ST. TURNING GEAR GT32 13-Jan-17 A
1ST. SYNCHRONIZATION GT GENERATOR 32MKA (POWER TO THE GRID)
0d
13-Jan-17 A
26d
06-Feb-17 A
03-Mrz-17 A
2d
04-Mrz-17 A
05-Mrz-17 A
PERFORMANCE TEST GT 32 (INCL. PREPARATION)
5d
15-Mrz-17 A
19-Mrz-17 A
OPTIMIZING UNIT 32
0d
19-Mrz-17 A
19-Mrz-17 A
OPTIMIZING UNIT 32
0d
20-Mrz-17 A
20-Mrz-17 A
OUTAGE (PRIOR RELIABILITY RUN)
30d
21-Mrz-17 A
19-Apr-17 A
50d
18-Mai-17 A
06-Jul-17 A
767d
01-Jun-15 A
06-Jul-17 A
SP31MB-3-25
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 31MB- 303d
01-Jun-15 A
29-Mrz-16 A
SI31MBA4-25
TRANSPORT GT 31 MB NSP - SITE
39d
29-Apr-16 A
06-Jun-16 A
OC31MB-6-20#
SUMMARY INS TALLATION GT31
164d
20-Jun-16 A
30-Nov-16 A
SI31MB-6-11
PLACING GT31
0d
15-Jul-16 A
OC31MB-6-55
OIL FLUSHING GT31
59d
29-Aug-16 A
27-Okt-16 A
SI31MB-8-25#
COLD COMMISSIONING GT31 / AUXILIARIES
25d
18-Dez-16 A
11-Jan-17 A
SI31MB-9-05
1ST. TURNING GEAR GT31
0d
13-Jan-17 A
SI31MBY9-35
GT PROTECTION GT31
1d
14-Jan-17 A
14-Jan-17 A
SI31MKA9-10
START UP TES T WITH MBJ 31MBA/SFC COMMISSIONING / MBP GAS FILLING 1d 14-Jan-17 A
14-Jan-17 A
SI31MBY9-36
SYSTEM CHECK BY SIEMENS GT31
14-Jan-17 A
SI31MKA9-40
1ST. SYNCHRONIZATION GT GENERATOR 31MKA (POWER TO THE GRID) 0d
SI31MB-9-15
1ST. IGNITION GT31
SI31MB-9-00
HOT COMMISSIONING GT31 / OPEN CYCLE
SI31MBA9-70
OPTIMIZING UNIT 31
SI31MBA9-92
OUTAGE (PRIOR PERFORMANCE TEST)
SI31MBA9-80
PERFORMANCE TEST GT31 (INCL. PREPARATION)
SI31MBA9-93
OUTAGE (PRIOR RELIABILITY RUN)
SI31MBA9-90
RELIABILITY RUN GT31 (failed - restart of RTR required)
SI31MBA9-94
RELIABILITY RUN GT31
SI31OC-9-45
GT31 COMMERCIAL OPEN CYCLE OPERATION
UNIT 31
Block 2 UNIT 22
1d
14-Jan-17 A
1ST. IGNITION GT32 HOT COMMISSIONING GT32 / OPEN CYCLE OUTAGE (PRIOR PERFORMANCE TEST) PERFORMANCE TEST GT 32 (INCL. PREPARATION)
RELIABILITY RUN GT 32 GT32 COMMERCIAL OPEN CYCLE OPERATION
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 31MBTRANSPORT GT 31 MB NSP - SITE SUMMARY INS TALLATION GT31 PLACING GT31 OIL FLUSHING GT31 COLD COMMISSIONING GT31 / AUXILIARIES 1ST. TURNING GEAR GT31 GT PROTECTION GT31 START UP TES T WITH MBJ 31MBA/SFC COMMISSIONING / MBP GAS FILLING SYSTEM CHECK BY SIEMENS GT31
15-Jan-17 A
0d
15-Jan-17 A
10d
09-Feb-17 A
18-Feb-17 A
0d
18-Feb-17 A
18-Feb-17 A
13d
19-Feb-17 A
03-Mrz-17 A
3d
04-Mrz-17 A
06-Mrz-17 A
12d
07-Mrz-17 A
19-Mrz-17 A
13d
21-Mrz-17 A
03-Apr-17 A
30d
09-Apr-17 A
08-Mai-17 A
1ST. SYNCHRONIZATION GT GENERATOR 31MKA (POWER TO THE GRID) 1ST. IGNITION GT31
50d
18-Mai-17 A
06-Jul-17 A
786d
04-Sep-15 A
28-Okt-17
786d
04-Sep-15 A
28-Okt-17
SP22MB-3-25
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 22MB- 404d
04-Sep-15 A
11-Okt-16 A
SI22MBA4-25
TRANSPORT GT22 MB NS P - SITE
20d
19-Okt-16 A
07-Nov-16 A
OC22MB-6-20#
SUMMARY INS TALLATION GT22
197d
24-Okt-16 A
09-Mai-17 A
SI22MB-6-11
PLACING GT22
0d
22-Nov-16 A
OC22MB-6-55
OIL FLUSHING GT 22
26d
13-Apr-17 A
HOT COMMISSIONING GT31 / OPEN CYCLE OPTIMIZING UNIT 31 OUTAGE (PRIOR PERFORMANCE TEST) PERFORMANCE TEST GT31 (INCL. PREPARATION) OUTAGE (PRIOR RELIABILITY RUN) RELIABILITY RUN GT31 (failed - restart of RTR required) RELIABILITY RUN GT31 GT31 COMMERCIAL OPEN CYCLE OPERATION
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 22MBTRANSPORT GT22 MB NSP - SITE SUMMARY INS TALLATION GT22 PLACING GT22
09-Mai-17 A
OIL FLUSHING GT 22
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
Layout Name : EG1019_Level2 Dur.
Start
Finish
15-Jun-17 A
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 6 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
SI22MB-8-25#
COLD COMMISSIONING GT22 / AUXILIARIES
33d
14-Mai-17 A
SI22MB-9-05
1ST. TURNING GEAR GT22
0d
27-Mai-17 A
SI22MBY9-35
GT PROTECTION GT22
3d
27-Mai-17 A
29-Mai-17 A
GT PROTECTION GT22
SI22MBY9-36
SYSTEM CHECK BY SIEMENS GT22
0d
27-Mai-17 A
27-Mai-17 A
SYSTEM CHECK BY SIEMENS GT22
SI22MKA9-10
START UP TES T WITH MBJ 22MBA
1d
29-Mai-17 A
29-Mai-17 A
START UP TEST WITH MBJ 22MBA
SI22MKA9-40
1ST. SYNCHRONIZATION GT GENERATOR 22MKA (TARGET POWER TO0d THE GRID) 30-Mai-17 A
1ST. SYNCHRONIZATION GT GENERATOR 22MKA (TARGET POWER TO THE GRID)
SI22MB-9-15
1ST. IGNITION GT22
1ST. IGNITION GT22
SI22MKA9-42
BASE LOAD OPERATION
9d
30-Mai-17 A
07-Jun-17 A
SI22MKA9-41
OUTAGE PRIOR HOT COMMISSIONING GT22
10d
08-Jun-17 A
17-Jun-17 A
SI22MB-9-00
HOT COMMISSIONING GT22 / OPEN CYCLE
16d
18-Jun-17 A
03-Jul-17 A
SI22MKA9-43
OUTAGE PRIOR PERFORMANCE TEST GT22
10d
04-Jul-17 A
13-Jul-17 A
SI22MBA9-70
OPTIMIZING UNIT 22
SI22MKA9-44
OUTAGE PRIOR PERFORMANCE TEST GT22 (GASCO)
SI22MBA9-80
PERFORMANCE TEST GT 22
SI22MBA9-90
RELIABILITY RUN GT 22
SI22OC-9-45
GT22 COMMERCIAL OPEN CYCLE OPERATION
0d
COLD COMMISSIONING GT22 / AUXILIARIES 1ST. TURNING GEAR GT22
30-Mai-17 A BASE LOAD OPERATION OUTAGE PRIOR HOT COMMISSIONING GT22
HOT COMMISSIONING GT22 / OPEN CYCLE OUTAGE PRIOR PERFORMANCE TEST GT22
0d
04-Jul-17 A
04-Jul-17 A
14d
14-Jul-17 A
27-Jul-17
2d
08-Aug-17*
09-Aug-17
30d
10-Aug-17
08-Sep-17
50d
09-Sep-17
28-Okt-17
783d
04-Sep-15 A
25-Okt-17
SP21MB-3-25
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 21MB- 394d
04-Sep-15 A
01-Okt-16 A
SI21MBA4-25
TRANSPORT GT 21 MB TO SITE
22d
09-Okt-16 A
31-Okt-16 A
OC21MB-6-20#
SUMMARY INS TALLATION GT21
209d
15-Okt-16 A
11-Mai-17 A
SI21MB-6-11
PLACING GT21
0d
27-Nov-16 A
OC21MB-6-55
OIL FLUSHING GT21
26d
14-Apr-17 A
10-Mai-17 A
SI21MB-8-25#
COLD COMMISSIONING GT21 / AUXILIARIES
33d
14-Mai-17 A
15-Jun-17 A
SI21MB-9-05
1ST. TURNING GEAR GT21
0d
27-Mai-17 A
SI21MBY9-36
SYSTEM CHECK BY SIEMENS GT21
0d
27-Mai-17 A
27-Mai-17 A
SYSTEM CHECK BY SIEMENS GT21
SI21MBY9-35
GT PROTECTION GT21
3d
27-Mai-17 A
29-Mai-17 A
GT PROTECTION GT21
SI21MKA9-10
START UP TES T WITH MBJ 21MBA
1d
30-Mai-17 A
30-Mai-17 A
SI21MB-9-15
1ST. IGNITION GT21
0d
31-Mai-17 A
SI21MKA9-40
1ST. SYNCHRONIZATION GT GENERATOR 21MKA (TARGET POWER TO0d THE GRID) 31-Mai-17 A
SI21MKA9-42
BASE LOAD OPERATION
SI21MKA9-41 SI21MB-9-00
UNIT 21
PERFORMANCE TEST GT 22 RELIABILITY RUN GT 22 GT22 COMMERCIAL OPEN CYCLE OPERATION
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 21MBTRANSPORT GT 21 MB TO SITE SUMMARY INS TALLATION GT21 PLACING GT21 OIL FLUSHING GT21 COLD COMMISSIONING GT21 / AUXILIARIES 1ST. TURNING GEAR GT21
START UP TES T WITH MBJ 21MBA 1ST. IGNITION GT21 1ST. SYNCHRONIZATION GT GENERATOR 21MKA (TARGET POWER TO THE GRID)
8d
31-Mai-17 A
07-Jun-17 A
OUTAGE PRIOR HOT COMMISSIONING GT21
7d
08-Jun-17 A
14-Jun-17 A
HOT COMMISSIONING GT21 / OPEN CYCLE
19d
15-Jun-17 A
03-Jul-17 A
SI21MKA9-43
OUTAGE PRIOR PERFORMANCE TEST GT21
10d
04-Jul-17 A
13-Jul-17 A
SI21MBA9-70
OPTIMIZING UNIT 21
SI21MKA9-44
OUTAGE PRIOR PERFORMANCE TEST GT21 (GASCO)
SI21MBA9-80
PERFORMANCE TEST GT21
SI21MBA9-90
RELIABILITY RUN GT21
SI21OC-9-45
GT21 COMMERCIAL OPEN CYCLE OPERATION
Block 1 UNIT 11
OPTIMIZING UNIT 22 OUTAGE PRIOR PERFORMANCE TEST GT22 (GASCO)
0d
04-Jul-17 A
04-Jul-17 A
14d
14-Jul-17 A
27-Jul-17
2d
05-Aug-17*
06-Aug-17
30d
07-Aug-17
05-Sep-17
50d
06-Sep-17
25-Okt-17
652d
14-Jan-16 A
26-Okt-17
BASE LOAD OPERATION OUTAGE PRIOR HOT COMMISSIONING GT21 HOT COMMISSIONING GT21 / OPEN CYCLE OUTAGE PRIOR PERFORMANCE TEST GT21 OPTIMIZING UNIT 21 OUTAGE PRIOR PERFORMANCE TEST GT21 (GASCO) PERFORMANCE TEST GT21 RELIABILITY RUN GT21 GT21 COMMERCIAL OPEN CYCLE OPERATION
649d
14-Jan-16 A
23-Okt-17
SP11MB-3-25
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 11MB- 400d
14-Jan-16 A
16-Feb-17 A
OC11MB-6-20#
SUMMARY INS TALLATION GT11
232d
02-Jan-17 A
21-Aug-17
SI11MBA4-25
TRANSPORT GT 11 MB TO SITE
24d
24-Feb-17 A
19-Mrz-17 A
SI11MB-6-11
PLACING GT11
0d
14-Apr-17 A
OC11MB-6-55
OIL FLUSHING GT11
7d
15-Aug-17
21-Aug-17
SI11MB-8-25#
COLD COMMISSIONING GT11 / AUXILIARIES
20d
11-Sep-17
30-Sep-17
SI11MB-9-05
1ST. TURNING GEAR GT11
0d
03-Okt-17
SI11MBY9-35
GT PROTECTION GT11
1d
03-Okt-17
03-Okt-17
SI11MKA9-10
START UP TES T WITH MBJ 11MBA
1d
08-Okt-17
08-Okt-17
SI11MKA9-40
1ST. SYNCHRONIZATION GT GENERATOR 11MKA (TARGET POW ER TO 0d THE GRID) 09-Okt-17
1ST. SYNCHRONIZATION GT GENERATOR 11MKA (TARGET POW ER TO THE GRID)
SI11MB-9-15
1ST. IGNITION GT11
1ST. IGNITION GT11
SI11MB-9-00
HOT COMMISSIONING GT11 / OPEN CYCLE
0d
SUMMARY INS TALLATION GT11 TRANSPORT GT 11 MB TO SITE PLACING GT11 OIL FLUSHING GT11 COLD COMMISSIONING GT11 / AUXILIARIES 1ST. TURNING GEAR GT11 GT PROTECTION GT11 START UP TES T WITH MBJ 11MBA
09-Okt-17
15d
09-Okt-17
23-Okt-17
652d
14-Jan-16 A
26-Okt-17
SP12MB-3-25
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 12MB- 368d
14-Jan-16 A
15-Jan-17 A
SI12MBA4-25
TRANSPORT GT12 MB TO SITE
15d
27-Jan-17 A
10-Feb-17 A
OC12MB-6-20#
SUMMARY INS TALLATION GT12
178d
24-Feb-17 A
20-Aug-17
SI12MB-6-11
PLACING GT12
0d
30-Mrz-17 A
OC12MB-6-55
OIL FLUSHING GT 12
SI12MB-8-25#
COLD COMMISSIONING GT12 / AUXILIARIES
SI12MB-9-05
UNIT 12
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 11MB-
HOT COMMISSIONING GT11 / OPEN CYCLE
DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 12MBTRANSPORT GT12 MB TO SITE SUMMARY INS TALLATION GT12 PLACING GT12
2d
09-Aug-17
10-Aug-17
23d
11-Sep-17
03-Okt-17
1ST. TURNING GEAR GT12
0d
06-Okt-17
SI12MBY9-35
GT PROTECTION GT12
1d
06-Okt-17
06-Okt-17
GT PROTECTION GT12
SI12MKA9-10
START UP TES T WITH MBJ 12MBA
1d
11-Okt-17
11-Okt-17
START UP TEST WITH MBJ 12MBA
SI12MKA9-40
1ST. SYNCHRONIZATION GT GENERATOR 12MKA (TARGET POWER TO0d THE GRID) 12-Okt-17
1ST. SYNCHRONIZATION GT GENERATOR 12MKA (TARGET POWER TO THE GRID)
SI12MB-9-15
1ST. IGNITION GT12
1ST. IGNITION GT12
SI12MB-9-00
HOT COMMISSIONING GT12 / OPEN CYCLE
Air Intake System MBL Block 4 UNIT 42
0d
OIL FLUSHING GT 12 COLD COMMISSIONING GT12 / AUXILIARIES 1ST. TURNING GEAR GT12
12-Okt-17
15d
12-Okt-17
26-Okt-17
771d
22-Jul-15 A
30-Aug-17
523d
22-Jul-15 A
25-Dez-16 A
519d
22-Jul-15 A
21-Dez-16 A
208d
22-Jul-15 A
15-Feb-16 A
SP42MBL3-25
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 42MBL
SI42MBL4-25
TRANSPORT AIR INTAK E SYS TEM 42MBL NSP-SITE
55d
20-Apr-16 A
13-Jun-16 A
OC42MBL6-15
ERECTION AIR INTAKE DUCT 42MBL
61d
20-Jun-16 A
20-Aug-16 A
OC42MBL6-20
ERECTION FILTERHOUSE 42MBL
137d
30-Jul-16 A
13-Dez-16 A
HOT COMMISSIONING GT12 / OPEN CYCLE
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 42MBL TRANSPORT AIR INTAK E SYS TEM 42MBL NSP-SITE ERECTION AIR IN TAKE DUCT 42MBL ERECTION FILTERHOUSE 42MBL
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
OC42MBL6-25
ERECTION AIR INTAKE SILENCER BAFFELS 42MBL
SI42MBL8-25
COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 42MBL
UNIT 41
Layout Name : EG1019_Level2 Dur.
Start
Finish
99d
06-Sep-16 A
13-Dez-16 A
7d
15-Dez-16 A
21-Dez-16 A
514d
31-Jul-15 A
25-Dez-16 A
SP41MBL3-25
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 41MBL
225d
31-Jul-15 A
11-Mrz-16 A
SI41MBL4-25
TRANSPORT AIR INTAK E SYS TEM 41MBL NSP-SITE
55d
20-Apr-16 A
13-Jun-16 A
OC41MBL6-15
ERECTION AIR INTAKE DUCT 41MBL
49d
23-Jun-16 A
11-Aug-16 A
OC41MBL6-20
ERECTION FILTERHOUSE 41MBL
43d
19-Jul-16 A
31-Aug-16 A
OC41MBL6-25
ERECTION AIR INTAKE SILENCER BAFFELS 41MBL
0d
17-Aug-16 A
17-Aug-16 A
SI41MBL8-25
COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 41MBL
7d
19-Dez-16 A
25-Dez-16 A
522d
07-Aug-15 A
09-Jan-17 A
512d
07-Aug-15 A
30-Dez-16 A
250d
07-Aug-15 A
12-Apr-16 A
53d
27-Apr-16 A
18-Jun-16 A
138d
30-Jul-16 A
14-Dez-16 A
Block 3 UNIT 32 SP32MBL3-25
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 32MBL
SI32MBL4-25
TRANSPORT AIR INTAK E SYS TEM 32MBL NSP-SITE
OC32MBL6-20
ERECTION FILTERHOUSE 32MBL
OC32MBL6-15
ERECTION AIR INTAKE DUCT 32MBL
23d
09-Aug-16 A
01-Sep-16 A
OC32MBL6-25
ERECTION AIR INTAKE SILENCER BAFFELS 32MBL
94d
13-Sep-16 A
15-Dez-16 A
SI32MBL8-25
COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 32MBL
4d
27-Dez-16 A
30-Dez-16 A
513d
16-Aug-15 A
09-Jan-17 A
248d
16-Aug-15 A
19-Apr-16 A
44d
06-Mai-16 A
18-Jun-16 A
132d
06-Aug-16 A
15-Dez-16 A
22-Aug-16 A
03-Sep-16 A
UNIT 31 SP31MBL3-25
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 31MBL
SI31MBL4-25
TRANSPORT AIR INTAK E SYS TEM 31MBL NSP-SITE
OC31MBL6-20
ERECTION FILTERHOUSE 31MBL
OC31MBL6-15
ERECTION AIR INTAKE DUCT 31MBL
12d
OC31MBL6-25
ERECTION AIR INTAKE SILENCER BAFFELS 31MBL
66d
11-Okt-16 A
15-Dez-16 A
SI31MBL8-25
COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 31MBL
2d
08-Jan-17 A
09-Jan-17 A
507d
04-Jan-16 A
24-Mai-17 A
Block 2 UNIT 22
507d
04-Jan-16 A
24-Mai-17 A
SP22MBL3-25
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 22MBL
249d
04-Jan-16 A
08-Sep-16 A
SI22MBL4-25
TRANSPORT AIR INTAK E SYS TEM 22MBL NSP-SITE
133d
23-Sep-16 A
02-Feb-17 A
OC22MBL6-15
ERECTION AIR INTAKE DUCT 22MBL
22d
16-Feb-17 A
09-Mrz-17 A
OC22MBL6-20
ERECTION FILTERHOUSE 22MBL
61d
10-Mrz-17 A
10-Mai-17 A
OC22MBL6-25
ERECTION AIR INTAKE SILENCER BAFFELS 22MBL
23d
16-Apr-17 A
09-Mai-17 A
SI22MBL8-25
COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 22MBL
7d
18-Mai-17 A
24-Mai-17 A
495d
12-Jan-16 A
20-Mai-17 A
UNIT 21 SP21MBL3-25
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 21MBL
248d
12-Jan-16 A
15-Sep-16 A
SI21MBL4-25
TRANSPORT AIR INTAK E SYS TEM 21MBL NSP-SITE
126d
30-Sep-16 A
02-Feb-17 A
OC21MBL6-15
ERECTION AIR INTAKE DUCT 21MBL
20d
18-Feb-17 A
09-Mrz-17 A
OC21MBL6-20
ERECTION FILTERHOUSE 21MBL
61d
10-Mrz-17 A
10-Mai-17 A
OC21MBL6-25
ERECTION AIR INTAKE SILENCER BAFFELS 21MBL
23d
16-Apr-17 A
09-Mai-17 A
SI21MBL8-25
COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 21MBL
7d
14-Mai-17 A
20-Mai-17 A
466d
22-Mai-16 A
30-Aug-17
466d
22-Mai-16 A
30-Aug-17
250d
22-Mai-16 A
26-Jan-17 A
Block 1 UNIT 11 SP11MBL3-25
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 11MBL
SI11MBL4-25
TRANSPORT AIR INTAK E SYS TEM 11MBL NS P-SITE
25d
10-Feb-17 A
06-Mrz-17 A
OC11MBL6-20
ERECTION FILTERHOUSE 11MBL
58d
09-Jun-17 A
05-Aug-17
OC11MBL6-15
ERECTION AIR INTAKE DUCT 11MBL
26d
13-Jun-17 A
08-Jul-17 A
OC11MBL6-25
ERECTION AIR INTAKE SILENCER BAFFELS 11MBL
10d
06-Aug-17
15-Aug-17
SI11MBL8-25
COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 11MBL
7d
24-Aug-17
30-Aug-17
24-Mai-16 A
30-Aug-17
464d
UNIT 12
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 7 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 ERECTION AIR INTAKE SILENCER BAFFELS 42MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 42MBL
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 41MBL TRANSPORT AIR INTAK E SYS TEM 41MBL NSP-SITE ERECTION AIR IN TAKE DUCT 41MBL ERECTION FILTERHOUSE 41MBL ERECTION AIR INTAKE SILENCER BAFFELS 41MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 41MBL
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 32MBL TRANSPORT AIR INTAKE SYSTEM 32MBL NSP-SITE ERECTION FILTERHOUSE 32MBL ERECTION AIR IN TAKE DUCT 32MBL ERECTION AIR IN TAKE SILENCER BAFFELS 32MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 32MBL
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 31MBL TRANSPORT AIR INTAKE SYSTEM 31MBL NSP-SITE ERECTION FILTERHOUSE 31MBL ERECTION AIR INTAKE DUCT 31MBL ERECTION AIR INTAKE SILENCER BAFFELS 31MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 31MBL
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 22MBL TRANSPORT AIR INTAKE SYS TEM 22MBL NSP-SITE ERECTION AIR INTAKE DUCT 22MBL ERECTION FILTERHOUSE 22MBL ERECTION AIR INTAKE SILENCER BAFFELS 22MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 22MBL
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 21MBL TRANSPORT AIR INTAKE SYS TEM 21MBL NSP-SITE ERECTION AIR INTAKE DUCT 21MBL ERECTION FILTERHOUSE 21MBL ERECTION AIR INTAKE SILENCER BAFFELS 21MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 21MBL
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 11MBL TRANSPORT AIR INTAK E SYS TEM 11MBL NS P-SITE ERECTION FILTERHOUSE 11MBL ERECTION AIR INTAKE DUCT 11MBL ERECTION AIR INTAKE SILENCER BAFFELS 11MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 11MBL
SP12MBL3-25
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 12MBL
248d
24-Mai-16 A
26-Jan-17 A
SI12MBL4-25
TRANSPORT AIR INTAK E SYS TEM 12MBL NSP-SITE
25d
10-Feb-17 A
06-Mrz-17 A
OC12MBL6-20
ERECTION FILTERHOUSE 12MBL
58d
09-Jun-17 A
05-Aug-17
ERECTION FILTERHOUSE 12MBL
OC12MBL6-15
ERECTION AIR INTAKE DUCT 12MBL
26d
13-Jun-17 A
08-Jul-17 A
ERECTION AIR INTAKE DUCT 12MBL
OC12MBL6-25
ERECTION AIR INTAKE SILENCER BAFFELS 12MBL
10d
06-Aug-17
15-Aug-17
SI12MBL8-25
COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 12MBL
7d
24-Aug-17
30-Aug-17
1004d
04-Sep-15 A
03-Jun-18
956d
04-Sep-15 A
16-Apr-18
956d
04-Sep-15 A
16-Apr-18
197d
04-Sep-15 A
18-Mrz-16 A
56d
26-Mrz-16 A
20-Mai-16 A
Bypass Stack including Diverter Damper MBR Block 4 UNIT 42 SI42MBR3E25
DESIGN, MANUFACTURING DIVERTER FLAP 42MBR
SI42MBR4E25
TRANSPORT DIVE RTER FLAP 42MBR VIETNAM - SITE (CHARTER)
OC42MBR6F15#
SUMMARY ERECTION DIV ERTER FLAP / STACK 42MB R
148d
24-Mai-16 A
18-Okt-16 A
OC42MBR6E15
ERECTION DIVERTER / DIVERTER FLAP 42MBR
164d
24-Mai-16 A
04-Nov-16 A
SI42MBR8A25
COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 42MBR
SI42MBR8J25
REMOVE BLANKING BLADE / INSTALL COMPENSATOR
UNIT 41
7d
10-Dez-16 A
16-Dez-16 A
14d
03-Apr-18
16-Apr-18
928d
02-Okt-15 A
16-Apr-18
172d
02-Okt-15 A
21-Mrz-16 A
54d
29-Mrz-16 A
22-Mai-16 A
SI41MBR3E25
DESIGN, MANUFACTURING DIVERTER FLAP 41MBR
SI41MBR4E25
TRANSPORT DIVE RTER FLAP 41MBR VIETNAM - SITE
OC41MBR6F15#
SUMMARY ERECTION DIV ERTER FLAP / STACK 41MB R
135d
06-Jun-16 A
18-Okt-16 A
OC41MBR6E15
ERECTION DIVERTER / DIVERTER FLAP 41MBR
151d
06-Jun-16 A
04-Nov-16 A
SI41MBR8A25
COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 41MBR
SI41MBR8A26
REMOVE BLANKING BLADE / INSTALL COMPENSATOR
Block 3 UNIT 32 SI32MBR3E25
DESIGN, MANUFACTURING DIVERTER FLAP 32MBR
7d
13-Dez-16 A
19-Dez-16 A
14d
03-Apr-18
16-Apr-18
837d
30-Okt-15 A
12-Feb-18
837d
30-Okt-15 A
12-Feb-18
186d
30-Okt-15 A
02-Mai-16 A
DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 12MBL TRANSPORT AIR INTAK E SYS TEM 12MBL NSP-SITE
ERECTION AIR INTAKE SILENCER BAFFELS 12MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 12MBL
DESIGN, MANUFACTURING DIVERTER FLAP 42MBR TRANSPORT DIVERTER FLAP 42MBR VIETNAM - SITE (CHARTER) SUMMARY ERECTION DIV ERTER FLAP / STACK 42MB R ERECTION DIVERTER / DIVERTER FLAP 42MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 42MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR
DESIGN, MANUFACTURING DIVERTER FLAP 41MBR TRANSPORT DIVE RTER FLAP 41MBR VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 41MB R ERECTION DIVERTER / DIVERTER FLAP 41MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 41MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR
DESIGN, MANUFACTURING DIVERTER FLAP 32MBR
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
SI32MBR4E25
TRANSPORT DIVE RTER FLAP 32MBR VIETNAM - SITE
OC32MBR6F15#
SUMMARY ERECTION DIV ERTER FLAP / STACK 32MB R
OC32MBR6E15
ERECTION DIVERTER / DIVERTER FLAP 32MBR
SI32MBR8A25
COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 32MBR
SI32MBR8J25
REMOVE BLANKING BLADE / INSTALL COMPENSATOR
UNIT 31 SI31MBR3E25
DESIGN, MANUFACTURING DIVERTER FLAP 31MBR
SI31MBR4E25
TRANSPORT DIVE RTER FLAP 31MBR VIETNAM - SITE
OC31MBR6F15#
SUMMARY ERECTION DIV ERTER FLAP / STACK 31MB R
OC31MBR6E15
ERECTION DIVERTER / DIVERTER FLAP 31MBR
SI31MBR8A25
COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 31MBR
SI31MBR8A26
REMOVE BLANKING BLADE / INSTALL COMPENSATOR
Block 2 UNIT 22
Layout Name : EG1019_Level2 Dur.
Start
Finish
43d
10-Mai-16 A
22-Jun-16 A
127d
09-Aug-16 A
14-Dez-16 A
87d
09-Aug-16 A
04-Nov-16 A
7d
03-Jan-17 A
09-Jan-17 A
14d
30-Jan-18
12-Feb-18
809d
27-Nov-15 A
12-Feb-18
171d
27-Nov-15 A
15-Mai-16 A
65d
23-Mai-16 A
27-Jul-16 A
119d
17-Aug-16 A
14-Dez-16 A
79d
17-Aug-16 A
04-Nov-16 A
3d
08-Jan-17 A
10-Jan-17 A
14d
30-Jan-18
12-Feb-18
777d
25-Dez-15 A
08-Feb-18
777d
25-Dez-15 A
08-Feb-18
186d
25-Dez-15 A
27-Jun-16 A
56d
05-Jul-16 A
29-Aug-16 A
154d
13-Nov-16 A
15-Apr-17 A
SI22MBR3E25
DESIGN, MANUFACTURING DIVERTER FLAP 22MBR
SI22MBR4E25
TRANSPORT DIVE RTER FLAP 22MBR VIETNAM - SITE
OC22MBR6F15#
SUMMARY ERECTION DIV ERTER FLAP / STACK 22MB R
OC22MBR6E15
ERECTION DIVERTER / DIVERTER FLAP 22MBR
83d
13-Nov-16 A
03-Feb-17 A
SI22MBR8A25
COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 22MBR
14d
11-Mai-17 A
24-Mai-17 A
SI22MBR8J25
REMOVE BLANKING BLADE / INSTALL COMPENSATOR
14d
26-Jan-18
08-Feb-18
749d
22-Jan-16 A
08-Feb-18
186d
22-Jan-16 A
25-Jul-16 A
63d
21-Jul-16 A
22-Sep-16 A
148d
19-Nov-16 A
15-Apr-17 A
80d
19-Nov-16 A
07-Feb-17 A
UNIT 21 SI21MBR3E25
DESIGN, MANUFACTURING DIVERTER FLAP 21MBR
SI21MBR4E25
TRANSPORT DIVE RTER FLAP 21MBR VIETNAM - SITE
OC21MBR6F15#
SUMMARY ERECTION DIV ERTER FLAP / STACK 21MB R
OC21MBR6E15
ERECTION DIVERTER / DIVERTER FLAP 21MBR
SI21MBR8A25
COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 21MBR
SI21MBR8A26
REMOVE BLANKING BLADE / INSTALL COMPENSATOR
Block 1 UNIT 11
7d
18-Mai-17 A
24-Mai-17 A
14d
26-Jan-18
08-Feb-18
836d
19-Feb-16 A
03-Jun-18
836d
19-Feb-16 A
03-Jun-18
186d
19-Feb-16 A
22-Aug-16 A
63d
30-Aug-16 A
01-Nov-16 A
228d
30-Dez-16 A
14-Aug-17
SI11MBR3E25
DESIGN, MANUFACTURING DIVERTER FLAP 11MBR
SI11MBR4E25
TRANSPORT DIVE RTER FLAP 11MB R VIETNAM - SITE
OC11MBR6F15#
SUMMARY ERECTION DIV ERTER FLAP / STACK 11MBR
OC11MBR6E15
ERECTION DIVERTER / DIVERTER FLAP 11MBR
66d
30-Dez-16 A
06-Mrz-17 A
SI11MBR8A25
COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 11MBR
14d
16-Aug-17
29-Aug-17
SI11MBR8A26
REMOVE BLANKING BLADE / INSTALL COMPENSATOR
14d
21-Mai-18
03-Jun-18
808d
18-Mrz-16 A
03-Jun-18
186d
18-Mrz-16 A
19-Sep-16 A
89d
27-Sep-16 A
25-Dez-16 A
246d
12-Dez-16 A
14-Aug-17
UNIT 12 SI12MBR3E25
DESIGN, MANUFACTURING DIVERTER FLAP 12MBR
SI12MBR4E25
TRANSPORT DIVE RTER FLAP 12MBR VIETNAM - SITE
OC12MBR6F15#
SUMMARY ERECTION DIV ERTER FLAP / STACK 12MB R
OC12MBR6E15
ERECTION DIVERTER / DIVERTER FLAP 12MBR
84d
12-Dez-16 A
06-Mrz-17 A
SI12MBR8A25
COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 12MBR
14d
15-Aug-17
28-Aug-17
SI12MBR8J25
REMOVE BLANKING BLADE / INSTALL COMPENSATOR
14d
21-Mai-18
03-Jun-18
863d
01-Jun-15 A
10-Okt-17
576d
01-Jun-15 A
27-Dez-16 A
575d
01-Jun-15 A
26-Dez-16 A
285d
01-Jun-15 A
11-Mrz-16 A
20d
GT Generator MKA Block 4 UNIT 42
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 8 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 TRANSPORT DIVE RTER FLAP 32MBR VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 32MB R ERECTION DIVERTER / DIVERTER FLAP 32MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 32MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR
DESIGN, MANUFACTURING DIVERTER FLAP 31MBR TRANSPORT DIVERTER FLAP 31MBR VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 31MB R ERECTION DIVERTER / DIVERTER FLAP 31MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 31MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR
DESIGN, MANUFACTURING DIVERTER FLAP 22MBR TRANSPORT DIVE RTER FLAP 22MBR VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 22MB R ERECTION DIVERTER / DIVERTER FLAP 22MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 22MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR
DESIGN, MANUFACTURING DIVERTER FLAP 21MBR TRANSPORT DIVE RTER FLAP 21MBR VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 21MB R ERECTION DIVERTER / DIVERTER FLAP 21MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 21MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR
DESIGN, MANUFACTURING DIVERTER FLAP 11MBR TRANSPORT DIVE RTER FLAP 11MB R VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 11MBR ERECTION DIVERTER / DIVERTER FLAP 11MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 11MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR
DESIGN, MANUFACTURING DIVERTER FLAP 12MBR TRANSPORT DIVERTER FLAP 12MBR VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 12MB R ERECTION DIVERTER / DIVERTER FLAP 12MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 12MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR
SP42MKA3-25
MANUFACTURING GT GENERATOR 42MKA
SI42MKA4-21
TRANSPORT GT GENERATO R 42MKA CHARLESTON-SITE
03-Mai-16 A
23-Mai-16 A
OC42MKA6-15#
SUMMARY INS TALLATION GEN 42 (INCL. PREPARATION FOUNDATIO N) 204d 42MKA 21-Mai-16 A
10-Dez-16 A
SI42MKA6-10
PLACING GENERATOR 42MKA
0d
13-Jun-16 A
SI42MKW8-25
COLD COMMISSIONING GENERATOR 42MKW SEAL OIL SYSTEM
3d
20-Dez-16 A
22-Dez-16 A
SI42MKG8-25
COLD COMMISSIONING GENERATOR 42MKG GAS SUPPLY SYSTEM
3d
21-Dez-16 A
23-Dez-16 A
COLD COMMISSIONING GENERATOR 42MKG GAS SUPPLY SYSTEM
SI42MKQ8-25
COLD COMMISSIONING GENERATOR 42MKQ WASTE GAS SYSTEM
2d
21-Dez-16 A
22-Dez-16 A
COLD COMMISSIONING GENERATOR 42MKQ WASTE GAS SYSTEM
SI42MKA8-25
COLD COMMISSIONING GENERATOR 42MKA
3d
21-Dez-16 A
23-Dez-16 A
SI42MKA8-26
GENERATOR 42MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 1d 26-Dez-16 A
26-Dez-16 A
UNIT 41
MANUFACTURING GT GENERATOR 42MKA TRANSPORT GT GENERATO R 42MKA CHARLESTON-SITE SUMMARY INSTALLATION GEN 42 (INCL. PREPARATION FOUNDATIO N) 42MKA PLACING GENERATOR 42MKA
576d
01-Jun-15 A
27-Dez-16 A
300d
01-Jun-15 A
26-Mrz-16 A
0d
27-Mrz-16 A
COLD COMMISSIONING GENERATOR 42MKW SEAL OIL SYSTEM
COLD COMMISSIONING GENERATOR 42MKA GENERATOR 42MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE)
SP41MKA3-25
MANUFACTURING GT GENERATOR 41MKA
SP41MKA3-80
DELIVERY GT GENERATO R 41MKA - EX WORKS
OC41MKA6-15#
SUMMARY INS TALLATION GEN41 (INCL. PREPARATION FOUNDATION) 215d 41MKA10-Mai-16 A
SI41MKA6-10
PLACING GENERATOR 41MKA
0d
05-Jun-16 A
SI41MKW8-25
COLD COMMISSIONING GENERATOR 41MKW SEAL OIL SYSTEM
8d
15-Dez-16 A
22-Dez-16 A
SI41MKA8-25
COLD COMMISSIONING GENERATOR 41MKA
3d
20-Dez-16 A
22-Dez-16 A
SI41MKG8-25
COLD COMMISSIONING GENERATOR 41MKG GAS SUPPLY SYSTEM
3d
24-Dez-16 A
26-Dez-16 A
COLD COMMISSIONING GENERATOR 41MKG GAS SUPPLY SYSTEM
SI41MKQ8-25
COLD COMMISSIONING GENERATOR 41MKQ WASTE GAS SYSTEM
2d
24-Dez-16 A
25-Dez-16 A
COLD COMMISSIONING GENERATOR 41MKQ WASTE GAS SYSTEM
SI41MKA8-26
GENERATOR 41MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 1d 27-Dez-16 A
27-Dez-16 A
GENERATOR 41MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE)
Block 3 UNIT 32
MANUFACTURING GT GENERATOR 41MKA DELIVERY GT GENERATO R 41MKA - EX WORKS
10-Dez-16 A
SUMMARY INS TALLATION GEN41 (INCL. PREPARATION FOUNDATION) 41MKA PLACING GENERATOR 41MKA
616d
01-Jun-15 A
05-Feb-17 A
616d
01-Jun-15 A
05-Feb-17 A
297d
01-Jun-15 A
24-Mrz-16 A
41d
COLD COMMISSIONING GENERATOR 41MKW SEAL OIL SYSTEM COLD COMMISSIONING GENERATOR 41MKA
SP32MKA3-25
MANUFACTURING GT GENERATOR 32MKA
SI32MKA4-21
TRANSPORT GT GENERATO R 32MKA CHARLESTON - SITE
26-Apr-16 A
05-Jun-16 A
OC32MKA6-15#
SUMMARY INS TALLATION GEN 32 (INCL. PREPARATION FOUNDATIO N) 176d 32MKA 18-Jun-16 A
10-Dez-16 A
SI32MKA6-10
PLACING GENERATOR 32MKA
0d
05-Jul-16 A
SI32MKW8-25
COLD COMMISSIONING GENERATOR 32MKW SEAL OIL SYSTEM
4d
27-Dez-16 A
30-Dez-16 A
SI32MKG8-25
COLD COMMISSIONING GENERATOR 32MKG GAS SUPPLY SYSTEM
4d
27-Dez-16 A
30-Dez-16 A
COLD COMMISSIONING GENERATOR 32MKG GAS SUPPLY SYSTEM
SI32MKQ8-25
COLD COMMISSIONING GENERATOR 32MKQ WASTE GAS SYSTEM
2d
27-Dez-16 A
28-Dez-16 A
COLD COMMISSIONING GENERATOR 32MKQ WASTE GAS SYSTEM
MANUFACTURING GT GENERATOR 32MKA TRANSPORT GT GENERATO R 32MKA CHARLESTON - SITE SUMMARY INSTALLATION GEN 32 (INCL. PREPARATION FOUNDATIO N) 32MKA PLACING GENERATOR 32MKA COLD COMMISSIONING GENERATOR 32MKW SEAL OIL SYSTEM
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
Layout Name : EG1019_Level2 Dur.
3d
Start
Finish
SI32MKA8-25
COLD COMMISSIONING GENERATOR 32MKA
27-Dez-16 A
29-Dez-16 A
SI32MKA8-26
GENERATOR 32MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 2d 04-Feb-17 A
05-Feb-17 A
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 9 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 COLD COMMISSIONING GENERATOR 32MKA GENERATOR 32MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE)
593d
01-Jun-15 A
315d
01-Jun-15 A
10-Apr-16 A
42d
29-Apr-16 A
09-Jun-16 A
OC31MKA6-15#
SUMMARY INS TALLATION GEN31 (INCL. PREPARATION FOUNDATION) 176d 31MKA 18-Jun-16 A
10-Dez-16 A
SI31MKA6-10
PLACING GENERATOR 31MKA
0d
18-Jul-16 A
SI31MKW8-25
COLD COMMISSIONING GENERATOR 31MKW SEAL OIL SYSTEM
5d
27-Dez-16 A
31-Dez-16 A
SI31MKA8-25
COLD COMMISSIONING GENERATOR 31MKA
3d
27-Dez-16 A
29-Dez-16 A
SI31MKQ8-25
COLD COMMISSIONING GENERATOR 31MKQ WASTE GAS SYSTEM
2d
27-Dez-16 A
28-Dez-16 A
COLD COMMISSIONING GENERATOR 31MKQ WASTE GAS SYSTEM
SI31MKG8-25
COLD COMMISSIONING GENERATOR 31MKG GAS SUPPLY SYSTEM
5d
27-Dez-16 A
31-Dez-16 A
COLD COMMISSIONING GENERATOR 31MKG GAS SUPPLY SYSTEM
SI31MKA8-26
GENERATOR 31MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 0d 14-Jan-17 A
14-Jan-17 A
UNIT 31 SP31MKA3-25
MANUFACTURING GT GENERATOR 31MKA
SI31MKA4-21
TRANSPORT GT GENERATO R 31MKA CHARLESTON - SITE
Block 2 UNIT 22
14-Jan-17 A MANUFACTURING GT GENERATOR 31MKA TRANSPORT GT GENERATO R 31MKA CHARLESTON - SITE SUMMARY INS TALLATION GEN31 (INCL. PREPARATION FOUNDATION) 31MKA PLACING GENERATOR 31MKA
655d
14-Aug-15 A
646d
21-Aug-15 A
27-Mai-17 A
353d
21-Aug-15 A
07-Aug-16 A
33d
COLD COMMISSIONING GENERATOR 31MKW SEAL OIL SYSTEM COLD COMMISSIONING GENERATOR 31MKA
GENERATOR 31MKA - LEAKGE TEST & H2 FILLING ( INKL. ARGON PURGE)
29-Mai-17 A
SP22MKA3-25
MANUFACTURING GT GENERATOR 22MKA
SI22MKA4-21
TRANSPORT GT GENERATO R 22MKA NSP - SITE
07-Okt-16 A
08-Nov-16 A
OC22MKA6-15#
SUMMARY INS TALLATION GEN 22 (INCL. PREPARATION FOUNDATIO N) 193d 22MKA 29-Okt-16 A
09-Mai-17 A
SI22MKA6-10
PLACING GENERATOR 22MKA
0d
23-Nov-16 A
SI22MKA8-25
COLD COMMISSIONING GENERATOR 22MKA
3d
18-Mai-17 A
20-Mai-17 A
SI22MKW8-25
COLD COMMISSIONING GENERATOR 22MKW SEAL OIL SYSTEM
3d
20-Mai-17 A
22-Mai-17 A
COLD COMMISSIONING GENERATOR 22MKW SEAL OIL SYSTEM
SI22MKG8-25
COLD COMMISSIONING GENERATOR 22MKG GAS SUPPLY SYSTEM
3d
21-Mai-17 A
23-Mai-17 A
COLD COMMISSIONING GENERATOR 22MKG GAS SUPPLY SYSTEM
SI22MKQ8-25
COLD COMMISSIONING GENERATOR 22MKQ WASTE GAS SYSTEM
3d
25-Mai-17 A
27-Mai-17 A
COLD COMMISSIONING GENERATOR 22MKQ WASTE GAS SYSTEM
SI22MKA8-26
GENERATOR 22MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 1d 27-Mai-17 A
27-Mai-17 A
GENERATOR 22MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE)
UNIT 21
MANUFACTURING GT GENERATOR 22MKA TRANSPORT GT GENERATO R 22MKA NSP - SITE SUMMARY INS TALLATION GEN 22 (INCL. PREPARATION FOUNDATIO N) 22MKA PLACING GENERATOR 22MKA
655d
14-Aug-15 A
29-Mai-17 A
391d
14-Aug-15 A
07-Sep-16 A
24d
COLD COMMISSIONING GENERATOR 22MKA
SP21MKA3-25
MANUFACTURING GT GENERATOR 21MKA
SI21MKA4-21
TRANSPORT GT GENERATO R 21MKA NSP - SITE
09-Okt-16 A
02-Nov-16 A
OC21MKA6-15#
SUMMARY INS TALLATION GEN21 (INCL. PREPARATION FOUNDATION) 207d 21MKA15-Okt-16 A
09-Mai-17 A
SI21MKA6-10
PLACING GENERATOR 21MKA
0d
28-Nov-16 A
SI21MKW8-25
COLD COMMISSIONING GENERATOR 21MKW SEAL OIL SYSTEM
3d
18-Mai-17 A
20-Mai-17 A
SI21MKA8-25
COLD COMMISSIONING GENERATOR 21MKA
3d
18-Mai-17 A
20-Mai-17 A
SI21MKG8-25
COLD COMMISSIONING GENERATOR 21MKG GAS SUPPLY SYSTEM
3d
21-Mai-17 A
23-Mai-17 A
COLD COMMISSIONING GENERATOR 21MKG GAS SUPPLY SYSTEM
SI21MKQ8-25
COLD COMMISSIONING GENERATOR 21MKQ WASTE GAS SYSTEM
1d
27-Mai-17 A
27-Mai-17 A
COLD COMMISSIONING GENERATOR 21MKQ WASTE GAS SYSTEM
SI21MKA8-27
GENERATOR 21MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 3d 27-Mai-17 A
29-Mai-17 A
GENERATOR 21MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE)
Block 1 UNIT 11
MANUFACTURING GT GENERATOR 21MKA TRANSPORT GT GENERATO R 21MKA NSP - SITE SUMMARY INSTALLATION GEN21 (INCL. PREPARATION FOUNDATION) 21MKA PLACING GENERATOR 21MKA
639d
11-Jan-16 A
636d
11-Jan-16 A
07-Okt-17
337d
11-Jan-16 A
13-Dez-16 A
33d
22-Dez-16 A
23-Jan-17 A
COLD COMMISSIONING GENERATOR 21MKW SEAL OIL SYSTEM COLD COMMISSIONING GENERATOR 21MKA
10-Okt-17
SP11MKA3-25
MANUFACTURING GT GENERATOR 11MKA
SI11MKA4-21
TRANSPORT GT GENERATO R 11MKA NS P - SITE
OC11MKA6-15#
SUMMARY INS TALLATION GEN11 (INCL. PREPARATIO N FO UNDATION) 224d 11MKA05-Jan-17 A
SI11MKA6-10
PLACING GENERATOR 11MKA
0d
15-Apr-17 A
SI11MKW8-25
COLD COMMISSIONING GENERATOR 11MKW SEAL OIL SYSTEM
8d
11-Sep-17
18-Sep-17
SI11MKA8-25
COLD COMMISSIONING GENERATOR 11MKA
3d
19-Sep-17
21-Sep-17
SI11MKG8-26
COLD COMMISSIONING GENERATOR 11MKG GAS SUPPLY SYSTEM
5d
22-Sep-17
26-Sep-17
COLD COMMISSIONING GENERATOR 11MKG GAS SUPPLY SYSTEM
SI11MKQ8-25
COLD COMMISSIONING GENERATOR 11MKQ WASTE GAS SYSTEM
3d
27-Sep-17
29-Sep-17
COLD COMMISSIONING GENERATOR 11MKQ WASTE GAS SYSTEM
SI11MKA8-26
GENERATOR 11MKA - LEAKGE TEST & H2 FILLING ( INKL. ARGON PURGE) 5d
03-Okt-17
07-Okt-17
596d
23-Feb-16 A
10-Okt-17
328d
23-Feb-16 A
15-Jan-17 A
UNIT 12 SP12MKA3-25
MANUFACTURING GT GENERATOR 12MKA
OC12MKA6-15#
SUMMARY INS TALLATION GEN 12 (INCL. PREPARATION FOUNDATIO N) 231d 12MKA 23-Dez-16 A
SI12MKA4-21
TRANSPORT GT GENERATO R 12MKA NSP - SITE
SI12MKA6-10 SI12MKW8-25
MANUFACTURING GT GENERATOR 11MKA TRANSPORT GT GENERATO R 11MKA NSP - SITE
16-Aug-17
SUMMARY INSTALLATION GEN11 (INCL. PREPARATIO N FO UNDATION) 11MKA PLACING GENERATOR 11MKA COLD COMMISSIONING GENERATOR 11MKW SEAL OIL SYSTEM COLD COMMISSIONING GENERATOR 11MKA
GENERATOR 11MKA - LEAKGE TEST & H2 FILLING ( INKL. ARGON PURGE)
MANUFACTURING GT GENERATOR 12MKA
10-Aug-17
SUMMARY INS TALLATION GEN 12 (INCL. PREPARATION FOUNDATIO N) 12MKA
19d
23-Jan-17 A
PLACING GENERATOR 12MKA
0d
31-Mrz-17 A
COLD COMMISSIONING GENERATOR 12MKW SEAL OIL SYSTEM
8d
11-Sep-17
18-Sep-17
SI12MKA8-25
COLD COMMISSIONING GENERATOR 12MKA
3d
19-Sep-17
21-Sep-17
SI12MKG8-25
COLD COMMISSIONING GENERATOR 12MKG GAS SUPPLY SYSTEM
5d
28-Sep-17
02-Okt-17
COLD COMMISSIONING GENERATOR 12MKG GAS SUPPLY SYSTEM
SI12MKQ8-25
COLD COMMISSIONING GENERATOR 12MKQ WASTE GAS SYSTEM
3d
03-Okt-17
05-Okt-17
COLD COMMISSIONING GENERATOR 12MKQ WASTE GAS SYSTEM
SI12MKA8-26
GENERATOR 12MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 5d
06-Okt-17
10-Okt-17
GENERATOR 12MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE)
197d
07-Mrz-16 A
20-Sep-16 A
39d
07-Mrz-16 A
15-Apr-16 A
39d
07-Mrz-16 A
15-Apr-16 A
39d
07-Mrz-16 A
15-Apr-16 A
45d
16-Mai-16 A
30-Jun-16 A
45d
16-Mai-16 A
30-Jun-16 A
45d
16-Mai-16 A
30-Jun-16 A
54d
28-Jul-16 A
20-Sep-16 A
54d
28-Jul-16 A
20-Sep-16 A
54d
28-Jul-16 A
20-Sep-16 A
168d
04-Dez-15 A
20-Mai-16 A
44d
04-Dez-15 A
17-Jan-16 A
24d
24-Dez-15 A
17-Jan-16 A
24d
24-Dez-15 A
17-Jan-16 A
38d
04-Dez-15 A
11-Jan-16 A
38d
04-Dez-15 A
11-Jan-16 A
49d
20-Dez-15 A
07-Feb-16 A
39d
30-Dez-15 A
07-Feb-16 A
39d
30-Dez-15 A
07-Feb-16 A
Piling for Fin Fan Cooler Area Block 4 COMMON OC4-URB5-46
PILING WORK 42/41 URB02 + TESTING
Block 3 COMMON OC3-URB5-47
PILING WORK 32/31 URB02 + TESTING
Block 2 COMMON OC2-URB5-48
PILING WORK 22/21 URB02 + TESTING
Piling for Exhaust Gas System Block 4 UNIT 42 OC42UHN5-00
PILING 42UHN + TESTING
UNIT 41 OC41UHN5-00
PILING 41UHN + TESTING
Block 3 UNIT 32 OC32UHN5-00
PILING 32UHN + TESTING
10-Feb-17 A
TRANSPORT GT GENERATO R 12MKA NSP - SITE PLACING GENERATOR 12MKA COLD COMMISSIONING GENERATOR 12MKW SEAL OIL SYSTEM COLD COMMISSIONING GENERATOR 12MKA
PILING WORK 42/41 URB02 + TESTING
PILING WORK 32/31 URB02 + TESTING
PILING WORK 22/21 URB02 + TESTING
PILING 42UHN + TESTING
PILING 41UHN + TESTING
PILING 32UHN + TESTING
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
UNIT 31 OC31UHN5-00
PILING 31UHN + TESTING
Block 2 UNIT 22 OC22UHN5-00
PILING 22UHN + TESTING
UNIT 21 OC21UHN5-00
PILING 21UHN + TESTING
Block 1 UNIT 11 OC11UHN5-00
PILING 11UHN + TESTING
UNIT 12 OC12UHN5-00
PILING 12UHN + TESTING
Piling UMB Area Block 4 GENERAL OC4-UMB5-00
PILING BUILDING FOUNDATION 41/42UMB + TESTING
UNIT 42
Layout Name : EG1019_Level2 Dur.
Start
Finish
23d
20-Dez-15 A
12-Jan-16 A
23d
20-Dez-15 A
12-Jan-16 A
49d
09-Feb-16 A
29-Mrz-16 A
47d
11-Feb-16 A
29-Mrz-16 A
47d
11-Feb-16 A
29-Mrz-16 A
31d
09-Feb-16 A
11-Mrz-16 A
31d
09-Feb-16 A
11-Mrz-16 A
37d
13-Apr-16 A
20-Mai-16 A
35d
15-Apr-16 A
20-Mai-16 A
35d
15-Apr-16 A
20-Mai-16 A
22d
13-Apr-16 A
05-Mai-16 A
22d
13-Apr-16 A
05-Mai-16 A
277d
21-Okt-15 A
24-Jul-16 A
190d
21-Okt-15 A
28-Apr-16 A
73d
21-Okt-15 A
02-Jan-16 A
73d
21-Okt-15 A
02-Jan-16 A
165d
10-Nov-15 A
23-Apr-16 A
OC42UMB5A00
PILING GT-SET FOUNDATION 42UMB + TESTING
53d
10-Nov-15 A
02-Jan-16 A
OC42UBF5-00
PILING 42UBE/UBF + TESTING
44d
29-Jan-16 A
13-Mrz-16 A
OC42UAH5-00
PILING 42UAH + TESTING (STO NE COLUMNS)
2d
21-Apr-16 A
23-Apr-16 A
166d
14-Nov-15 A
28-Apr-16 A
UNIT 41 OC41UMB5-00
PILING GT-SET FOUNDATION 41UMB + TESTING
35d
14-Nov-15 A
19-Dez-15 A
OC41UBF5-00
PILING 41UBE/UBF + TESTING
34d
24-Dez-15 A
27-Jan-16 A
OC41UAH5-00
PILING 41UAH + TESTING (STO NE COLUMNS)
2d
26-Apr-16 A
28-Apr-16 A
196d
27-Okt-15 A
10-Mai-16 A
80d
27-Okt-15 A
15-Jan-16 A
80d
27-Okt-15 A
15-Jan-16 A
144d
14-Dez-15 A
06-Mai-16 A
Block 3 GENERAL OC3-UMB5-00
PILING BUILDING FOUNDATION 31/32UMB + TESTING
UNIT 32
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 10 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 PILING 31UHN + TESTING
PILING 22UHN + TESTING
PILING 21UHN + TESTING
PILING 11UHN + TESTING
PILING 12UHN + TESTING
PILING BUILDING FOUNDATION 41/42UMB + TESTING
PILING GT-SET FOUNDATION 42UMB + TESTING PILING 42UBE/UBF + TESTING PILING 42UAH + TESTING (STO NE COLUMNS)
PILING GT-SET FOUNDATION 41UMB + TESTING PILING 41UBE/UBF + TESTING PILING 41UAH + TESTING (STO NE COLUMNS)
PILING BUILDING FOUNDATION 31/32UMB + TESTING
OC32UMB5A00
PILING GT-SET FOUNDATION 32UMB + TESTING
13d
14-Dez-15 A
27-Dez-15 A
PILING GT-SET FOUNDATION 32UMB + TESTING
OC32UBF5-00
PILING 32UBE/UBF + TESTING
18d
31-Mrz-16 A
18-Apr-16 A
PILING 32UBE/UBF + TESTING
OC32UAH5-00
PILING 32UAH + TESTING (STO NE COLUMNS)
1d
05-Mai-16 A
06-Mai-16 A
130d
01-Jan-16 A
10-Mai-16 A
UNIT 31 OC31UMB5-00
PILING GT-SET FOUNDATION 31UMB + TESTING
14d
01-Jan-16 A
15-Jan-16 A
OC31UBF5-00
PILING 31UBE/UBF + TESTING
23d
01-Jan-16 A
24-Jan-16 A
OC31UAH5-00
PILING 31UAH + TESTING (STO NE COLUMNS)
1d
09-Mai-16 A
10-Mai-16 A
137d
03-Jan-16 A
19-Mai-16 A
64d
09-Feb-16 A
13-Apr-16 A
64d
09-Feb-16 A
13-Apr-16 A
113d
25-Jan-16 A
17-Mai-16 A
Block 2 GENERAL OC2-UMB5-00
PILING BUILDING FOUNDATION 21/22UMB + TESTING
UNIT 22 OC22UMB5A00
PILING GT-SET FOUNDATION 22UMB + TESTING
15d
25-Jan-16 A
09-Feb-16 A
OC22UBF5-00
PILING 22UBE/UBF + TESTING
19d
29-Jan-16 A
17-Feb-16 A
OC22UAH5-00
PILING 22UAH + TESTING (STO NE COLUMNS)
1d
16-Mai-16 A
17-Mai-16 A
137d
03-Jan-16 A
19-Mai-16 A
UNIT 21
PILING 32UAH + TESTING (STO NE COLUMNS)
PILING GT-SET FOUNDATION 31UMB + TESTING PILING 31UBE/UBF + TESTING PILING 31UAH + TESTING (STO NE COLUMNS)
PILING BUILDING FOUNDATION 21/22UMB + TESTING
PILING GT-SET FOUNDATION 22UMB + TESTING PILING 22UBE/UBF + TESTING PILING 22UAH + TESTING (STO NE COLUMNS)
OC21UBF5-00
PILING 21UBE/UBF + TESTING
24d
03-Jan-16 A
27-Jan-16 A
PILING 21UBE/UBF + TESTING
OC21UMB5-00
PILING GT-SET FOUNDATION 21UMB + TESTING
38d
07-Mrz-16 A
14-Apr-16 A
PILING GT-SET FOUNDATION 21UMB + TESTING
OC21UAH5-00
PILING 21UAH + TESTING (STO NE COLUMNS)
1d
18-Mai-16 A
19-Mai-16 A
199d
07-Jan-16 A
24-Jul-16 A
53d
13-Mrz-16 A
05-Mai-16 A
53d
13-Mrz-16 A
05-Mai-16 A
144d
07-Jan-16 A
30-Mai-16 A
Block 1 GENERAL OC1-UMB5-00
PILING BUILDING FOUNDATION 11/12UMB + TESTING
UNIT 11
PILING 21UAH + TESTING (STO NE COLUMNS)
PILING BUILDING FOUNDATION 11/12UMB + TESTING
OC11UBF5-00
PILING 11UBE/UBF + TESTING
16d
07-Jan-16 A
23-Jan-16 A
OC11UMB5-00
PILING GT-SET FOUNDATION 11UMB + TESTING
31d
06-Mrz-16 A
06-Apr-16 A
PILING GT-SET FOUNDATION 11UMB + TESTING
OC11UAH5-00
PILING 11UAH + TESTING (STONE COLUMNS)
PILING 11UAH + TESTING (STONE COLUMNS)
UNIT 12
1d
29-Mai-16 A
30-Mai-16 A
146d
29-Feb-16 A
24-Jul-16 A
PILING 11UBE/UBF + TESTING
OC12UBF5-00
PILING 12UBE/UBF + TESTING
39d
29-Feb-16 A
24-Jul-16 A
PILING 12UBE/UBF + TESTING
OC12UMB5A00
PILING GT-SET FOUNDATION 12UMB + TESTING
44d
05-Mrz-16 A
18-Apr-16 A
PILING GT-SET FOUNDATION 12UMB + TESTING
OC12UAH5-00
PILING 12UAH + TESTING (STO NE COLUMNS)
PILING 12UAH + TESTING (STO NE COLUMNS)
2d
03-Jun-16 A
05-Jun-16 A
Concrete Structure for PCCs UBA3110/3210/3310/3410/3510 + UBD134d
10-Feb-16 A
23-Jun-16 A
28d
13-Mrz-16 A
10-Apr-16 A
0d
13-Mrz-16 A
13-Mrz-16 A
Block 4 UNIT 42 OC42UBA5-45
(RFE) FOUNDATION 42UBA/UBD
0d
UNIT 41 OC41UBA5-45
(RFE) FOUNDATION 41UBA/UBD
Block 3 UNIT 32 OC32UBA5-45
(RFE) FOUNDATION 32UBA/UBD
(RFE) FOUNDATION 31UBA/UBD
Block 2 UNIT 22 OC22UBA5-45
(RFE) FOUNDATION 22UBA/UBD
OC21UBA5-45
Block 1 UNIT 11
10-Apr-16 A
42d
12-Mai-16 A
23-Jun-16 A
0d
12-Mai-16 A
12-Mai-16 A
23-Jun-16 A
23-Jun-16 A
0d
(RFE) FOUNDATION 21UBA/UBD
10-Apr-16 A
0d
12-Mai-16 A
0d
23-Jun-16 A
5d
10-Feb-16 A
15-Feb-16 A
0d
15-Feb-16 A
15-Feb-16 A
0d 0d
UNIT 21
13-Mrz-16 A 10-Apr-16 A
0d
UNIT 31 OC31UBA5-45
0d
15-Feb-16 A 10-Feb-16 A
0d
(RFE) FOUNDATION 42UBA/UBD
(RFE) FOUNDATION 41UBA/UBD
(RFE) FOUNDATION 32UBA/UBD
(RFE) FOUNDATION 31UBA/UBD
(RFE) FOUNDATION 22UBA/UBD
10-Feb-16 A 10-Feb-16 A
7d
26-Mrz-16 A
02-Apr-16 A
0d
26-Mrz-16 A
26-Mrz-16 A
(RFE) FOUNDATION 21UBA/UBD
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
OC11UBA5-45
Activity Name
(RFE) FOUNDATION 11UBA/UBD
Dur.
(RFE) FOUNDATION 12UBA/UBD
Structures for Generator Transformer UBF Block 4 UNIT 42
Start
0d 0d
UNIT 12 OC12UBA5-45
Layout Name : EG1019_Level2 Finish
26-Mrz-16 A 02-Apr-16 A
02-Apr-16 A
384d
29-Jan-16 A
15-Feb-17 A
137d
04-Feb-16 A
19-Jun-16 A
101d
10-Mrz-16 A
19-Jun-16 A 13-Mrz-16 A
0d
WORK PREPARATION, EXCAVATION 42UBE/UBF
3d
10-Mrz-16 A
OC42UBF5-10
(H) START PLACING FORMWORK 42UBE/UBF
0d
27-Mrz-16 A
OC42UBF5-15
CONSTRUCTION FOUNDATION 42UBE/UBF
23d
27-Mrz-16 A
19-Apr-16 A
OC42UBF5-25
WALLS & PADS 42UBE/UBF
31d
23-Apr-16 A
24-Mai-16 A
OC42UBF5E15
OIL RESISTANT PAINT 42UBE/UBF
12d
07-Jun-16 A
19-Jun-16 A
137d
04-Feb-16 A
19-Jun-16 A
11d
04-Feb-16 A
15-Feb-16 A
0d
17-Feb-16 A
WORK PREPARATION, EXCAVATION 41UBE/UBF
OC41UBF5-10
(H) START PLACING FORMWORK 41UBE/UBF
OC41UBF5-15
CONSTRUCTION FOUNDATION 41UBE/UBF
80d
17-Feb-16 A
07-Mai-16 A
OC41UBF5-25
WALLS & PADS 41UBE/UBF
29d
17-Apr-16 A
16-Mai-16 A
OC41UBF5E15
OIL RESISTANT PAINT 41UBE/UBF
14d
06-Jun-16 A
19-Jun-16 A
182d
29-Jan-16 A
29-Jul-16 A
WORK PREPARATION, EXCAVATION 42UBE/UBF
CONSTRUCTION FOUNDATION 42UBE/UBF WALLS & PADS 42UBE/UBF OIL RESISTANT PAINT 42UBE/UBF
WORK PREPARATION, EXCAVATION 41UBE/UBF (H) START PLACING FORMWORK 41UBE/UBF
95d
23-Apr-16 A
27-Jul-16 A
OC32UBF5-05
WORK PREPARATION, EXCAVATION 32UBE/UBF
2d
23-Apr-16 A
25-Apr-16 A
OC32UBF5-10
(H) START PLACING FORMWORK 32UBE/UBF
0d
02-Mai-16 A
OC32UBF5-15
CONSTRUCTION FOUNDATION 32UBE/UBF
7d
02-Mai-16 A
09-Mai-16 A
OC32UBF5-25
WALLS & PADS 32UBE/UBF
14d
11-Mai-16 A
25-Mai-16 A
OC32UBF5E15
OIL RESISTANT PAINT 32UBE/UBF
50d
07-Jun-16 A
27-Jul-16 A
182d
29-Jan-16 A
29-Jul-16 A
13d
29-Jan-16 A
11-Feb-16 A
0d
11-Feb-16 A
UNIT 31
(RFE) FOUNDATION 12UBA/UBD
(H) START PLACING FORMWORK 42UBE/UBF
OC41UBF5-05
Block 3 UNIT 32
(RFE) FOUNDATION 11UBA/UBD
02-Apr-16 A
OC42UBF5-05
UNIT 41
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 11 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
CONSTRUCTION FOUNDATION 41UBE/UBF WALLS & PADS 41UBE/UBF OIL RESISTANT PAINT 41UBE/UBF
WORK PREPARATION, EXCAVATION 32UBE/UBF (H) START PLACING FORMWORK 32UBE/UBF CONSTRUCTION FOUNDATION 32UBE/UBF WALLS & PADS 32UBE/UBF OIL RESISTANT PAINT 32UBE/UBF
OC31UBF5-05
WORK PREPARATION, EXCAVATION 31UBE/UBF
OC31UBF5-10
(H) START PLACING FORMWORK 31UBE/UBF
OC31UBF5-15
CONSTRUCTION FOUNDATION 31UBE/UBF
67d
11-Feb-16 A
18-Apr-16 A
CONSTRUCTION FOUNDATION 31UBE/UBF
OC31UBF5-25
WALLS & PADS 31UBE/UBF
96d
17-Feb-16 A
23-Mai-16 A
WALLS & PADS 31UBE/UBF
OC31UBF5E15
OIL RESISTANT PAINT 31UBE/UBF
53d
06-Jun-16 A
29-Jul-16 A
200d
17-Feb-16 A
04-Sep-16 A
Block 2 UNIT 22
(H) START PLACING FORMWORK 31UBE/UBF
174d
18-Feb-16 A
10-Aug-16 A
OC22UBF5-05
WORK PREPARATION, EXCAVATION 22UBE/UBF
1d
18-Feb-16 A
19-Feb-16 A
OC22UBF5-10
(H) START PLACING FORMWORK 22UBE/UBF
0d
20-Feb-16 A
OC22UBF5-15
CONSTRUCTION FOUNDATION 22UBE/UBF
43d
20-Feb-16 A
03-Apr-16 A
OC22UBF5-25
WALLS & PADS 22UBE/UBF
25d
12-Apr-16 A
07-Mai-16 A
OC22UBF5E15
OIL RESISTANT PAINT 22UBE/UBF
18d
23-Jul-16 A
10-Aug-16 A
200d
17-Feb-16 A
04-Sep-16 A
10d
17-Feb-16 A
27-Feb-16 A
0d
22-Feb-16 A
UNIT 21 WORK PREPARATION, EXCAVATION 21UBE/UBF
OC21UBF5-10
(H) START PLACING FORMWORK 21UBE/UBF
OC21UBF5-15
CONSTRUCTION FOUNDATION 21UBE/UBF
75d
22-Feb-16 A
07-Mai-16 A
OC21UBF5-25
WALLS & PADS 21UBE/UBF
33d
05-Mai-16 A
07-Jun-16 A
OC21UBF5E15
OIL RESISTANT PAINT 21UBE/UBF
8d
27-Aug-16 A
04-Sep-16 A
369d
13-Feb-16 A
15-Feb-17 A
369d
13-Feb-16 A
15-Feb-17 A
42d
13-Feb-16 A
26-Mrz-16 A
0d
13-Mrz-16 A
WORK PREPARATION, EXCAVATION 11UBE/UBF
OC11UBF5-10
(H) START PLACING FORMWORK 11UBE/UBF
OC11UBF5-15
CONSTRUCTION FOUNDATION 11UBE/UBF
55d
13-Mrz-16 A
07-Mai-16 A
OC11UBF5-25
WALLS & PADS 11UBE/UBF
37d
22-Mai-16 A
28-Jun-16 A
OC11UBF5E15
OIL RESISTANT PAINT 11UBE/UBF
11d
05-Feb-17 A
15-Feb-17 A
171d
03-Aug-16 A
20-Jan-17 A 06-Aug-16 A
WORK PREPARATION, EXCAVATION 12UBE/UBF
3d
03-Aug-16 A
OC12UBF5-10
(H) START PLACING FORMWORK 12UBE/UBF
0d
31-Aug-16 A
OC12UBF5-15
CONSTRUCTION FOUNDATION 12UBE/UBF
8d
31-Aug-16 A
08-Sep-16 A
OC12UBF5-25
WALLS & PADS 12UBE/UBF
17d
14-Sep-16 A
30-Sep-16 A
OC12UBF5E15
OIL RESISTANT PAINT 12UBE/UBF
70d
12-Nov-16 A
20-Jan-17 A
809d
10-Aug-15 A
26-Okt-17
484d
10-Aug-15 A
05-Dez-16 A
477d
10-Aug-15 A
28-Nov-16 A
Block 4 UNIT 42 MANUFACTURING, SHOP TEST MAIN TRANSFORMER 42BAT *
273d
10-Aug-15 A
08-Mai-16 A
SI42BAT4-25
TRANSPORT MAIN TRANSFORMER CONSTANZA-SITE 42BAT *
34d
09-Mai-16 A
11-Jun-16 A
OC42BAT7-15
ERECTION GENERATOR TRANSFORMERS 42BAT
84d
21-Jul-16 A
13-Okt-16 A
SI42BAT8-25
COMMISSIONING MAIN TRANSFORMER 42BAT
7d
22-Nov-16 A
28-Nov-16 A
484d
10-Aug-15 A
05-Dez-16 A
SI41BAT3-25
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 41BAT *
273d
10-Aug-15 A
08-Mai-16 A
SI41BAT4-25
TRANSPORT MAIN TRANSFORMER CONSTANZA-SITE 41BAT *
34d
09-Mai-16 A
11-Jun-16 A
OC41BAT7-15
ERECTION GENERATOR TRANSFORMERS 41BAT
93d
21-Jul-16 A
22-Okt-16 A
SI41BAT8-25
COMMISSIONING MAIN TRANSFORMER 41BAT
7d
29-Nov-16 A
05-Dez-16 A
471d
09-Sep-15 A
22-Dez-16 A
461d
09-Sep-15 A
12-Dez-16 A
274d
09-Sep-15 A
08-Jun-16 A
Block 3 UNIT 32
WALLS & PADS 22UBE/UBF OIL RESISTANT PAINT 22UBE/UBF
WORK PREPARATION, EXCAVATION 21UBE/UBF
CONSTRUCTION FOUNDATION 21UBE/UBF WALLS & PADS 21UBE/UBF OIL RESISTANT PAINT 21UBE/UBF
WORK PREPARATION, EXCAVATION 11UBE/UBF
CONSTRUCTION FOUNDATION 11UBE/UBF WALLS & PADS 11UBE/UBF OIL RESISTANT PAINT 11UBE/UBF
WORK PREPARATION, EXCAVATION 12UBE/UBF (H) START PLACING FORMWORK 12UBE/UBF
SI42BAT3-25
UNIT 41
CONSTRUCTION FOUNDATION 22UBE/UBF
(H) START PLACING FORMWORK 11UBE/UBF
OC12UBF5-05
Transformer for GT BAT
WORK PREPARATION, EXCAVATION 22UBE/UBF
(H) START PLACING FORMWORK 21UBE/UBF
OC11UBF5-05
UNIT 12
OIL RESISTANT PAINT 31UBE/UBF
(H) START PLACING FORMWORK 22UBE/UBF
OC21UBF5-05
Block 1 UNIT 11
WORK PREPARATION, EXCAVATION 31UBE/UBF
SI32BAT3-25
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 32BAT *
SI32BAT4-25
TRANSPORT MAIN TRANSFORMER NSP-SITE 32BAT *
32d
09-Jun-16 A
10-Jul-16 A
OC32BAT7-15
ERECTION GENERATOR TRANSFORMERS 32BAT
87d
21-Jul-16 A
16-Okt-16 A
CONSTRUCTION FOUNDATION 12UBE/UBF WALLS & PADS 12UBE/UBF OIL RESISTANT PAINT 12UBE/UBF
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 42BAT * TRANSPORT MAIN TRANSFORMER CONSTANZA-SITE 42BAT * ERECTION GENERATOR TRANSFORMERS 42BAT COMMISSIONING MAIN TRANSFORMER 42BAT
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 41BAT * TRANSPORT MAIN TRANSFORMER CONSTANZA-SITE 41BAT * ERECTION GENERATOR TRANSFORMERS 41BAT COMMISSIONING MAIN TRANSFORMER 41BAT
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 32BAT * TRANSPORT MAIN TRANSFORMER NSP-SITE 32BAT * ERECTION GENERATOR TRANSFORMERS 32BAT
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
SI32BAT8-25
Activity Name
COMMISSIONING MAIN TRANSFORMER 32BAT
UNIT 31
Layout Name : EG1019_Level2 Dur.
Start
Finish
5d
08-Dez-16 A
12-Dez-16 A
471d
09-Sep-15 A
22-Dez-16 A
SI31BAT3-25
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 31BAT *
274d
09-Sep-15 A
08-Jun-16 A
SI31BAT4-25
TRANSPORT MAIN TRANSFORMER NSP-SITE 31BAT *
32d
09-Jun-16 A
10-Jul-16 A
OC31BAT7-15
ERECTION GENERATOR TRANSFORMERS 31BAT
97d
19-Jul-16 A
24-Okt-16 A
SI31BAT8-25
COMMISSIONING MAIN TRANSFORMER 31BAT
5d
18-Dez-16 A
22-Dez-16 A
484d
02-Jan-16 A
30-Apr-17 A
484d
02-Jan-16 A
29-Apr-17 A
264d
02-Jan-16 A
21-Sep-16 A
Block 2 UNIT 22 SI22BAT3-25
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 22BAT *
SI22BAT4-25
TRANSPORT MAIN TRANSFORMER NSP-SITE 22BAT *
16d
22-Sep-16 A
07-Okt-16 A
OC22BAT7-15
ERECTION GENERATOR TRANSFORMERS 22BAT
62d
16-Dez-16 A
16-Feb-17 A
SI22BAT8-25
COMMISSIONING MAIN TRANSFORMER 22BAT
7d
23-Apr-17 A
29-Apr-17 A
484d
02-Jan-16 A
30-Apr-17 A
264d
UNIT 21 SI21BAT3-25
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 21BAT *
02-Jan-16 A
21-Sep-16 A
SI11BAT3-25
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 11BAT * (TO BE271d USED FOR 16-Mai-16 21BAT) A
10-Feb-17 A
SI21BAT4-25
TRANSPORT MAIN TRANSFORMER NSP-SITE 21BAT *
22-Sep-16 A
07-Okt-16 A
SI11BAT4-25
TRANSPORT MAIN TRANSFORMER NSP-SITE 11BAT *(TO BE USED FOR 32d21BAT) 11-Feb-17 A
14-Mrz-17 A
OC21BAT7-15
ERECTION GENERATOR TRANSFORMERS 21BAT
SI21BAT8-25
COMMISSIONING MAIN TRANSFORMER 21BAT
Block 1 UNIT 11
16d
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 12 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 COMMISSIONING MAIN TRANSFORMER 32BAT
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 31BAT * TRANSPORT MAIN TRANSFORMER NSP-SITE 31BAT * ERECTION GENERATOR TRANSFORMERS 31BAT COMMISSIONING MAIN TRANSFORMER 31BAT
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 22BAT * TRANSPORT MAIN TRANSFORMER NSP-SITE 22BAT * ERECTION GENERATOR TRANSFORMERS 22BAT COMMISSIONING MAIN TRANSFORMER 22BAT
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 21BAT * MANUFACTURING, SHOP TEST MAIN TRANSFORMER 11BAT * (TO BE USED FOR 21BAT) TRANSPORT MAIN TRANSFORMER NSP-SITE 21BAT * TRANSPORT MAIN TRANSFORMER NSP-SITE 11BAT *(TO BE USED FOR 21BAT)
37d
15-Mrz-17 A
20-Apr-17 A
ERECTION GENERATOR TRANSFORMERS 21BAT
6d
24-Apr-17 A
30-Apr-17 A
COMMISSIONING MAIN TRANSFORMER 21BAT
529d
16-Mai-16 A
26-Okt-17
437d
16-Mai-16 A
26-Jul-17 MANUFACTURING, SHOP TEST MAIN TRANSFORMER 11BAT * (NEW TRAFO)
SI11BAT3-81
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 11BAT * (NEW TRAFO) 370d 16-Mai-16 A
20-Mai-17 A
SI11BAT4-42
TRANSPORT MAIN TRANSFORMER NSP-SITE 11BAT (NEW TRAFO)
25d
21-Mai-17 A
14-Jun-17 A
OC11BAT7-15
ERECTION GENERATOR TRANSFORMERS 11BAT
22d
26-Jun-17 A
18-Jul-17 A
ERECTION GENERATOR TRANSFORMERS 11BAT
SI11BAT8-25
COMMISSIONING MAIN TRANSFORMER 11BAT
7d
20-Jul-17 A
26-Jul-17
COMMISSIONING MAIN TRANSFORMER 11BAT
432d
16-Mai-16 A
21-Jul-17 A
UNIT 12
TRANSPORT MAIN TRANSFORMER NSP-SITE 11BAT (NEW TRAFO)
SI12BAT3-25
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 12BAT *
271d
16-Mai-16 A
10-Feb-17 A
SI12BAT4-25
TRANSPORT MAIN TRANSFORMER NSP-SITE 12BAT
32d
11-Feb-17 A
14-Mrz-17 A
OC12BAT7-15
ERECTION GENERATOR TRANSFORMERS 12BAT
42d
24-Mai-17 A
04-Jul-17 A
SI12BAT8-25
COMMISSIONING MAIN TRANSFORMER 12BAT
7d
15-Jul-17 A
21-Jul-17 A
323d
08-Dez-16 A
26-Okt-17
SI01BAT3-83
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 01BAT01 * (SPA289d RE TRAFO) 08-Dez-16 A
22-Sep-17
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 01BAT01 * (SPA RE TRAFO)
SI01BAT4-43
TRANSPORT MAIN TRANSFORMER NSP-SITE 01BAT01 * (SPARE TRAFO) 34d
23-Sep-17
26-Okt-17
TRANSPORT MAIN TRANSFORMER NSP-SITE 01BAT01 * (SPARE TRAFO)
468d
03-Mai-16 A
14-Aug-17
233d
03-Mai-16 A
21-Dez-16 A
224d
03-Mai-16 A
13-Dez-16 A
UNIT 01 - SPARE
PCC for GT Block 4 UNIT 42 SI42UBA4H25
TRANSPORT PCC 42UBA3110/3310 NSP - SITE
38d
03-Mai-16 A
09-Jun-16 A
OC42UBA7-15
INTERNAL INSTALLATION PCC 42UBA3110/3210/3310/3410/3510
28d
23-Jul-16 A
20-Aug-16 A
SI42UBA8G25#
ELECTRICAL COMMISSIONING FOR BACK ENERGIZING
26d
17-Nov-16 A
12-Dez-16 A
SI42B--8-50
MV AVAILABLE (BACK ENERGIZING)
0d
13-Dez-16 A
233d
03-Mai-16 A
21-Dez-16 A
UNIT 41 TRANSPORT PCC 41UBA3110/3310 NSP - SITE
38d
03-Mai-16 A
09-Jun-16 A
OC41UBA7-15
INTERNAL INSTALLATION PCC 41UBA3110/3210/3310/3410/3510
17d
03-Aug-16 A
20-Aug-16 A
SI41UBA8-25#
COMMISSIONING ELECTRICAL SYSTE MS (GT41)
35d
17-Nov-16 A
21-Dez-16 A
SI41B--8-50
MV AVAILABLE (BACK ENERGIZING)
0d
21-Dez-16 A
230d
23-Mai-16 A
07-Jan-17 A
222d
23-Mai-16 A
31-Dez-16 A
TRANSPORT PCC 32UBA3110/3310 NSP - SITE
35d
23-Mai-16 A
26-Jun-16 A
OC32UBA7-15
INTERNAL INSTALLATION PCC 32UBA3110/3210/3310/3410/3510
48d
12-Aug-16 A
28-Sep-16 A
SI32UBA8G25#
ELECTRICAL COMMISSIONING FOR BACK ENERGIZING
35d
23-Nov-16 A
27-Dez-16 A
SI32B--8-50
MV AVAILABLE (BACK ENERGIZING)
0d
31-Dez-16 A
230d
23-Mai-16 A
07-Jan-17 A
TRANSPORT PCC 31UBA3110/3310 NSP - SITE
35d
23-Mai-16 A
26-Jun-16 A
OC31UBA7-15
INTERNAL INSTALLATION PCC 31UBA3110/3210/3310/3410/3510
65d
23-Jul-16 A
25-Sep-16 A
SI31UBA8-25#
COMMISSIONING ELECTRICAL SYSTE MS (GT31)
34d
05-Dez-16 A
07-Jan-17 A
SI31B--8-50
MV AVAILABLE (BACK ENERGIZING)
0d
31-Dez-16 A
233d
25-Sep-16 A
16-Mai-17 A
TRANSPORT PCC 42UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 42UBA3110/3210/3310/3410/3510 ELECTRICAL COMMISSIONING FOR BACK ENERGIZING
TRANSPORT PCC 41UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 41UBA3110/3210/3310/3410/3510 COMMISSIONING ELECTRICAL SYSTE MS (GT41)
TRANSPORT PCC 32UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 32UBA3110/3210/3310/3410/3510 ELECTRICAL COMMISSIONING FOR BACK ENERGIZING
10-Mai-17 A
TRANSPORT PCC 31UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 31UBA3110/3210/3310/3410/3510 COMMISSIONING ELECTRICAL SYSTE MS (GT31) MV AVAILABLE (BACK ENERGIZING)
228d
25-Sep-16 A
SI22UBA4H25
TRANSPORT PCC 22UBA3110/3310 NSP - SITE
35d
25-Sep-16 A
30-Okt-16 A
OC22UBA7-15
INTERNAL INSTALLATION PCC 22UBA3110/3210/3310/3410/3510
71d
19-Dez-16 A
28-Feb-17 A
SI22UBA8G25#
ELECTRICAL COMMISSIONING FOR BACK ENERGIZING
38d
02-Apr-17 A
09-Mai-17 A
SI22B--8-50
MV AVAILABLE (BACK ENERGIZING)
0d
10-Mai-17 A
233d
25-Sep-16 A
16-Mai-17 A
UNIT 21
COMMISSIONING MAIN TRANSFORMER 12BAT
MV AVAILABLE (BACK ENERGIZING)
SI31UBA4H25
Block 2 UNIT 22
ERECTION GENERATOR TRANSFORMERS 12BAT
MV AVAILABLE (BACK ENERGIZING)
SI32UBA4H25
UNIT 31
TRANSPORT MAIN TRANSFORMER NSP-SITE 12BAT
MV AVAILABLE (BACK ENERGIZING)
SI41UBA4H25
Block 3 UNIT 32
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 12BAT *
TRANSPORT PCC 22UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 22UBA3110/3210/3310/3410/3510 ELECTRICAL COMMISSIONING FOR BACK ENERGIZING MV AVAILABLE (BACK ENERGIZING)
SI21UBA4H25
TRANSPORT PCC 21UBA3110/3310 NSP - SITE
35d
25-Sep-16 A
30-Okt-16 A
OC21UBA7-15
INTERNAL INSTALLATION PCC 21UBA3110/3210/3310/3410/3510
74d
17-Dez-16 A
01-Mrz-17 A
SI21UBA8G25#
ELECTRICAL COMMISSIONING FOR BACK ENERGIZING
44d
02-Apr-17 A
15-Mai-17 A
ELECTRICAL COMMISSIONING FOR BACK ENERGIZING
SI21UBA8-25#
COMMISSIONING ELECTRICAL SYSTE MS (GT21)
37d
09-Apr-17 A
15-Mai-17 A
COMMISSIONING ELECTRICAL SYSTE MS (GT21)
SI21B--8-50
MV AVAILABLE (BACK ENERGIZING)
0d
16-Mai-17 A
176d
19-Feb-17 A
Block 1 UNIT 11
TRANSPORT PCC 21UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 21UBA3110/3210/3310/3410/3510
MV AVAILABLE (BACK ENERGIZING) 14-Aug-17
176d
19-Feb-17 A
14-Aug-17
SI11UBA4H25
TRANSPORT PCC 11UBA3110/3310 NSP - SITE
35d
19-Feb-17 A
25-Mrz-17 A
OC11UBA7-15
INTERNAL INSTALLATION PCC 11UBA3110/3210/3310/3410/3510
51d
30-Mrz-17 A
20-Mai-17 A
SI11UBA8-25#
COMMISSIONING ELECTRICAL SYSTE MS (GT11)
39d
06-Jul-17 A
13-Aug-17
TRANSPORT PCC 11UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 11UBA3110/3210/3310/3410/3510 COMMISSIONING ELECTRICAL SYSTE MS (GT11)
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
SI11B--8-50
Activity Name
MV AVAILABLE (BACK ENERGIZING)
UNIT 12
Layout Name : EG1019_Level2 Dur.
0d
Start
Finish
14-Aug-17
MV AVAILABLE (BACK ENERGIZING)
165d
01-Mrz-17 A
12-Aug-17
SI12UBA4H25
TRANSPORT PCC 12UBA3110/3310 NSP - SITE
35d
01-Mrz-17 A
04-Apr-17 A
OC12UBA7-15
INTERNAL INSTALLATION PCC 12UBA3110/3210/3310/3410/3510
53d
01-Apr-17 A
24-Mai-17 A
SI12UBA8G25#
ELECTRICAL COMMISSIONING FOR BACK ENERGIZING
38d
06-Jul-17 A
12-Aug-17
SI12B--8-50
MV AVAILABLE (BACK ENERGIZING)
0d
12-Aug-17 19-Jun-16 A
08-Sep-17
424d
19-Jun-16 A
16-Aug-17
424d
19-Jun-16 A
16-Aug-17
424d
19-Jun-16 A
16-Aug-17
332d
20-Jun-16 A
18-Mai-17 A
332d
20-Jun-16 A
18-Mai-17 A
389d
16-Jul-16 A
08-Aug-17
389d
16-Jul-16 A
08-Aug-17
389d
16-Jul-16 A
08-Aug-17
248d
11-Aug-16 A
15-Apr-17 A
248d
11-Aug-16 A
15-Apr-17 A
177d
04-Jan-17 A
29-Jun-17 A
177d
04-Jan-17 A
29-Jun-17 A
177d
04-Jan-17 A
29-Jun-17 A
121d
10-Jan-17 A
10-Mai-17 A
121d
10-Jan-17 A
10-Mai-17 A
241d
11-Jan-17 A
08-Sep-17
237d
11-Jan-17 A
04-Sep-17
237d
11-Jan-17 A
04-Sep-17
241d
11-Jan-17 A
08-Sep-17
241d
11-Jan-17 A
08-Sep-17
926d
25-Aug-15 A
08-Mrz-18
589d
24-Jun-16 A
02-Feb-18
589d
24-Jun-16 A
02-Feb-18
589d
24-Jun-16 A
02-Feb-18
OC40P--6A15#
SUMMARY PIP ING, CABLING PAB / C / H / PB / PCB / PGB / PUS SYSTEM 524d
24-Jun-16 A
29-Nov-17
OC40---6A15#
SUMMARY ERECTION WATER S TEAM CYCLE (BO P POWER BLOCK)589d
24-Jun-16 A
02-Feb-18
OC40E--6A15#
SUMMARY PIP ING, INSUL., CABLING EG D/EKG/MB-AUX.SYSTEM
272d
11-Aug-16 A
10-Mai-17 A
OC40LC-6A15#
SUMMARY PIP ING, INSUL., CABLING LCA /C/W/LCL/QC/QU SYS TEM 243d
27-Mai-17 A
24-Jan-18
OC40L--6-15#
SUMMARY PIP ING, INSUL., CABLING LBA /G/S/MAN S YSTEM
190d
02-Jul-17 A
07-Jan-18
542d
20-Apr-16 A
13-Okt-17
123d
29-Mai-16 A
28-Sep-16 A
123d
29-Mai-16 A
28-Sep-16 A
123d
29-Mai-16 A
28-Sep-16 A
0d
27-Jul-16 A
140d
20-Apr-16 A
07-Sep-16 A
140d
20-Apr-16 A
07-Sep-16 A
140d
20-Apr-16 A
07-Sep-16 A
0d
15-Aug-16 A
470d
01-Jul-16 A
13-Okt-17
470d
01-Jul-16 A
13-Okt-17
Block 4 UNIT 42 OC42B--7-15#
SUMMARY ELECTRICAL ERECTION 42UMB
UNIT 41 OC41B--7-15#
SUMMARY ELECTRICAL ERECTION 41UMB
Block 3 UNIT 32 OC32B--7-15#
SUMMARY ELECTRICAL ERECTION 32UMB
UNIT 31 OC31B--7-15#
SUMMARY ELECTRICAL ERECTION 31UMB
Block 2 UNIT 22 OC22B--7-15#
SUMMARY ELECTRICAL ERECTION 22UMB
UNIT 21 OC21B--7-15#
SUMMARY ELECTRICAL ERECTION 21UMB
Block 1 UNIT 11 OC11B--7-15#
SUMMARY ELECTRICAL ERECTION 11UMB
UNIT 12 OC12B--7-15#
SUMMARY ELECTRICAL ERECTION 12UMB
STEAM TURBINE AREA Piping Erection Block 4 UNIT 40
Turboset Foundation UMA Block 4 UNIT 40 OC40UMA5A15#
SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION)
OC40UMA5A10
(H) START PLACING FORMWORK ST-SET FOUNDATION UMA
Block 3 UNIT 30 OC30UMA5A15#
SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION)
OC30UMA5A10
(H) START PLACING FORMWORK ST-SET FOUNDATION UMA
Block 2 UNIT 20
0d
01-Jul-16 A
OC20UMA5Y15
CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 20UMA 30d
01-Jul-16 A
31-Jul-16 A
OC20UMA5A15#
SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION)
94d
22-Jul-16 A
24-Okt-16 A
OC20UMA5A10
(H) START PLACING FORMWORK ST-SET FOUNDATION UMA
0d
04-Okt-16 A
OC20UMA5B15#
SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 20UMA
339d
09-Nov-16 A
13-Okt-17
135d
31-Mai-16 A
12-Okt-16 A
135d
31-Mai-16 A
12-Okt-16 A
135d
31-Mai-16 A
12-Okt-16 A
0d
25-Aug-16 A
607d
18-Feb-16 A
16-Okt-17
585d
11-Mrz-16 A
16-Okt-17
585d
11-Mrz-16 A
16-Okt-17
381d
11-Mrz-16 A
26-Mrz-17 A
SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION)
OC10UMA5A10
(H) START PLACING FORMWORK ST-SET FOUNDATION UMA
Civil Works UMA Block 4 UNIT 40
SUMMARY ELECTRICAL ERECTION 41UMB
SUMMARY ELECTRICAL ERECTION 32UMB
SUMMARY ELECTRICAL ERECTION 31UMB
SUMMARY ELECTRICAL ERECTION 22UMB
SUMMARY ELECTRICAL ERECTION 21UMB
SUMMARY ELECTRICAL ERECTION 11UMB
SUMMARY ELECTRICAL ERECTION 12UMB
SUMMARY PIP ING, CABLING PAB / C / H / PB / PCB / PGB / PUS SYSTEM SUMMARY ERECTION WATER S TEAM CYCLE (BO P POWER BLOCK) SUMMARY PIPING, INSUL., CABLING EG D/EKG/MB-AUX.SYSTEM SUMMARY PIPING, INSUL., CABLING LCA/C/W/LCL/QC/QU SYSTEM SUMMARY PIPING, INSUL., CABLING LBA /G/S/MAN SYSTEM
SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION)
SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION)
CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 20UMA SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION) (H) START PLACING FORMWORK ST-SET FOUNDATION UMA SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 20UMA
SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION) (H) START PLACING FORMWORK ST-SET FOUNDATION UMA
SUMMARY BUILDING FOUNDATION 40UMA ( INCL. E XCAVATION)
OC40UMA5-10
(H) START PLACING FORMWORK BUILD.FOUNDATION 40UMA
0d
14-Apr-16 A
OC40UMA5Y10
(H) START PLACING FORMWORK COND.PIT 40UMA
0d
16-Apr-16 A
OC40UMA5Y15
CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 40UMA 47d
16-Apr-16 A
02-Jun-16 A
OC40UMA5B15#
SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 40UMA
287d
03-Jan-17 A
16-Okt-17
OC40SMM6-15
ERECTION CRANE 40SMM02FOR UMA
1d
02-Mai-17 A
03-Mai-17 A
595d
18-Feb-16 A
04-Okt-17
595d
18-Feb-16 A
04-Okt-17
469d
18-Feb-16 A
31-Mai-17 A
SUMMARY BUILDING FOUNDATION 40UMA ( INCL. EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION 40UMA (H) START PLACING FORMWORK COND.PIT 40UMA
OC30UMA5-16#
SUMMARY BUILDING FOUNDATION UMA ( INCL. EXCAVATION)
OC30UMA5-10
(H) START PLACING FORMWORK BUILD.FOUNDATION UMA
0d
10-Apr-16 A
OC30UMA5Y10
(H) START PLACING FORMWORK COND.PIT 30UMA
0d
26-Apr-16 A
OC30UMA5Y15
CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 30UMA 40d
26-Apr-16 A
05-Jun-16 A
OC30UMA5B15#
SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 30UMA
319d
20-Nov-16 A
04-Okt-17
OC30SMM6-15
ERECTION CRANE 30SMM02FOR UMA
23d
05-Apr-17 A
27-Apr-17 A
303d
09-Mai-16 A
08-Mrz-17 A
Block 2
SUMMARY ELECTRICAL ERECTION 42UMB
(H) START PLACING FORMWORK COND.PIT 20UMA
OC40UMA5-16#
Block 3 UNIT 30
ELECTRICAL COMMISSIONING FOR BACK ENERGIZING
(H) START PLACING FORMWORK ST-SET FOUNDATION UMA
(H) START PLACING FORMWORK COND.PIT 20UMA
OC10UMA5A15#
INTERNAL INSTALLATION PCC 12UBA3110/3210/3310/3410/3510
(H) START PLACING FORMWORK ST-SET FOUNDATION UMA
OC20UMA5Y10
Block 1 UNIT 10
TRANSPORT PCC 12UBA3110/3310 NSP - SITE
MV AVAILABLE (BACK ENERGIZING)
447d
Electrical Installations in UMB
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 13 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 40UMA SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 40UMA ERECTION CRANE 40SMM02FOR UMA
SUMMARY BUILDING FOUNDATION UMA ( INCL. EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION UMA (H) START PLACING FORMWORK COND.PIT 30UMA CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 30UMA SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 30UMA ERECTION CRANE 30SMM02FOR UMA
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
UNIT 20 OC20UMA5-16#
SUMMARY BUILDING FOUNDATION UMA ( INCL. EXCAVATION)
OC20UMA5-10
(H) START PLACING FORMWORK BUILD.FOUNDATION UMA
Block 1 UNIT 10
Layout Name : EG1019_Level2 Dur.
Start
Finish
303d
09-Mai-16 A
08-Mrz-17 A
303d
09-Mai-16 A
08-Mrz-17 A
0d
03-Jul-16 A
504d
31-Mai-16 A
504d
31-Mai-16 A
16-Okt-17
289d
31-Mai-16 A
16-Mrz-17 A
16-Okt-17
SUMMARY BUILDING FOUNDATION UMA ( INCL. EXCAVATION)
OC10UMA5-10
(H) START PLACING FORMWORK BUILD.FOUNDATION UMA
0d
26-Jun-16 A
OC10UMA5Y10
(H) START PLACING FORMWORK COND.PIT 10UMA
0d
20-Jul-16 A
OC10UMA5Y15
CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 10UMA 19d
20-Jul-16 A
08-Aug-16 A
OC10UMA5B15#
SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 10UMA
346d
05-Nov-16 A
16-Okt-17
OC10SMM6-15
ERECTION CRANE 10SMM02FOR UMA
20d
04-Feb-17 A
23-Feb-17 A
926d
25-Aug-15 A
08-Mrz-18
772d
26-Jan-16 A
08-Mrz-18
772d
26-Jan-16 A
08-Mrz-18
Block 4 UNIT 40
(H) START PLACING FORMWORK COND.PIT 10UMA
DETAIL DESIGN / MANUFA CTURING / ASSEMBLY HI-L- STEAM TURBINE 469d & ST-AUXILIARIES 26-Jan-16 A 40MA 09-Mai-17 A
SI40MA-4C41
TRANSPORT ST LP OUTER CASING INDONESIA-SITE
OC40MA-6A15#
SUMMARY ERECTION ST
OC40MA-6-15# OC40MA-6-07
PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA
1d
06-Mai-17 A
06-Mai-17 A
SI40MA-4-25
TRANSPORT LP/HP-ST 40MA NSP - SITE
29d
16-Mai-17 A
14-Jun-17 A
OC40MA-6B47
PLACING LP1-TURBINE PEDESTALS MA
OC40MA-6B15#
SUMMARY ERECTION LP STEAM TURBINE MA
OC40MA-6C15#
SUMMARY ERECTION K-TURBINE MA
SI40MA-6C10
PLACING K-TURBINE MA
IO40MA-6B49
#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA 0d
SI40MA-6B16
PLACING LP1-TURBINE SHAFT IN BEARINGS MA
2d
IS40MA-6B51
#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA
0d
OC40MA-6D35#
SUMMARY FINA L ASSEMBLING STEAM TURBINE MA-
23d
19-Okt-17
10-Nov-17
OC40MAV6-71
LUBE OIL FLUSHING (INCL. PRESSURE TEST)
21d
11-Nov-17
01-Dez-17
SI40MA-8-25#
COLD COMMISSIONING ST
89d
09-Dez-17
07-Mrz-18
SI40MA-9-05
1ST. TURNING GEAR ST 40
0d
08-Mrz-18
61d
10-Feb-17 A
248d
05-Apr-17 A
08-Dez-17
SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA 59d
05-Apr-17 A
03-Jun-17 A
Block 3 UNIT 30
11-Apr-17 A
3d
28-Mai-17 A
31-Mai-17 A
136d
01-Jun-17 A
14-Okt-17
71d
17-Jun-17 A
26-Aug-17
0d
20-Jul-17 A
DETAIL DESIGN / MANUFA CTURING / ASSEMBLY HI-L- STEAM TURBINE & ST-AUXILIARIES 40MA TRANSPORT ST LP OUTER CASING INDONESIA-SITE SUMMARY ERECTION ST SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA TRANSPORT LP/HP-ST 40MA NSP - SITE PLACING LP1-TURBINE PEDESTALS MA SUMMARY ERECTION LP STEAM TURBINE MA SUMMARY ERECTION K-TURBINE MA PLACING K-TURBINE MA
02-Sep-17
PLACING LP1-TURBINE SHAFT IN BEARINGS MA
02-Sep-17
#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA SUMMARY FINA L ASSEMBLING STEAM TURBINE MALUBE OIL FLUSHING (INCL. PRESSURE TEST) COLD COMMISSIONING ST 1ST. TURNING GEAR ST 40
22-Feb-18
806d
09-Dez-15 A
22-Feb-18
SP30MA-3-25
DETAIL DESIGN / MANUFA CTURING / ASSEMBLY HI-L- STEAM TURBINE 489d & ST-AUXILIARIES 09-Dez-15 A 30MA 10-Apr-17 A
SI30MA-4C41
TRANSPORT ST LP OUTER CASING INDONESIA-SITE
58d
31-Dez-16 A
26-Feb-17 A
OC30MA-6-07
PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA
17d
01-Apr-17 A
18-Apr-17 A
OC30MA-6B47
PLACING LP1-TURBINE PEDESTALS MA
8d
15-Apr-17 A
23-Apr-17 A
SI30MA-4-25
TRANSPORT LP/HP-ST 30MA NSP - SITE
36d
18-Apr-17 A
23-Mai-17 A
OC30MA-6B15#
SUMMARY ERECTION LP STEAM TURBINE MA
179d
06-Mai-17 A
31-Okt-17
OC30MA-6C15#
SUMMARY ERECTION K-TURBINE MA
101d
06-Mai-17 A
14-Aug-17
OC30MA-6A15#
SUMMARY ERECTION ST
232d
08-Mai-17 A
25-Dez-17
OC30MA-6-15#
SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA 19d
08-Mai-17 A
26-Mai-17 A
SI30MA-6C10
PLACING K-TURBINE MA
14-Mai-17 A
IO30MA-6B49
#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA 0d
SI30MA-6B16
PLACING LP1-TURBINE SHAFT IN BEARINGS MA
2d
IS30MA-6B51
#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA
0d
OC30MA-6D35#
SUMMARY FINA L ASSEMBLING STEAM TURBINE MA-
23d
05-Nov-17
27-Nov-17
OC30MAV6-71
LUBE OIL FLUSHING (INCL. PRESSURE TEST)
21d
28-Nov-17
18-Dez-17
SI30MA-8-25#
COLD COMMISSIONING ST
58d
26-Dez-17
21-Feb-18
SI30MA-9-05
1ST. TURNING GEAR ST 30
0d
22-Feb-18
Block 2 UNIT 20
SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 10UMA ERECTION CRANE 10SMM02FOR UMA
#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARIN GS MA
09-Dez-15 A
18-Sep-17
CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 10UMA
01-Sep-17
806d
0d
SUMMARY BUILDING FOUNDATION UMA ( IN CL. EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION UMA
SP40MA-3-25
01-Sep-17
SUMMARY BUILDING FOUNDATION UMA ( IN CL. EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION UMA
OC10UMA5-16#
Steam Turbine
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 14 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
DETAIL DESIGN / MANUFA CTURING / ASSEMBLY HI-L- STEAM TURBINE & ST-AUXILIARIES 30MA TRANSPORT ST LP OUTER CASING INDONESIA-SITE PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA PLACING LP1-TURBINE PEDESTALS MA TRANSPORT LP/HP-ST 30MA NSP - SITE SUMMARY ERECTION LP STEAM TURBINE MA SUMMARY ERECTION K-TURBINE MA SUMMARY ERECTION ST SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA PLACING K-TURBINE MA
17-Sep-17
#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA
19-Sep-17
PLACING LP1-TURBINE SHAFT IN BEARINGS MA
19-Sep-17
#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA SUMMARY FINA L ASSEMBLING STEAM TURBINE MALUBE OIL FLUSHING (INCL. PRESSURE TEST) COLD COMMISSIONING ST 1ST. TURNING GEAR ST 30
851d
03-Okt-15 A
31-Jan-18
851d
03-Okt-15 A
31-Jan-18
SP20MA-3-25
DETAIL DESIGN / MANUFA CTURING / ASSEMBLY HI-L- STEAM TURBINE 487d & ST-AUXILIARIES 03-Okt-15 A 20MA 31-Jan-17 A
DETAIL DESIGN / MANUFACTURING / ASSEMBLY HI-L- STEAM TURBINE & ST-AUXILIARIES 20MA
SI20MA-4C41
TRANSPORT ST LP OUTER CASING INDONESIA-SITE
86d
12-Nov-16 A
06-Feb-17 A
TRANSPORT ST LP OUTER CASING INDONESIA-SITE
SI20MA-4-25
TRANSPORT LP/HP-ST 20MA NSP - SITE
36d
08-Feb-17 A
15-Mrz-17 A
TRANSPORT LP/HP-ST 20MA NSP - SITE
OC20MA-6A15#
SUMMARY ERECTION ST
258d
15-Mrz-17 A
27-Nov-17
OC20MA-6-15#
SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA 73d
15-Mrz-17 A
26-Mai-17 A
OC20MA-6-07
PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA
19d
27-Mrz-17 A
15-Apr-17 A
PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA
OC20MA-6B47
PLACING LP1-TURBINE PEDESTALS MA
1d
28-Mrz-17 A
29-Mrz-17 A
PLACING LP1-TURBINE PEDESTALS MA
OC20MA-6C15#
SUMMARY ERECTION K-TURBINE MA
99d
29-Apr-17 A
05-Aug-17
OC20MA-6B15#
SUMMARY ERECTION LP STEAM TURBINE MA
152d
05-Mai-17 A
03-Okt-17
SI20MA-6C10
PLACING K-TURBINE MA
0d
06-Mai-17 A
IO20MA-6B49
#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA 0d
SI20MA-6B16
PLACING LP1-TURBINE SHAFT IN BEARINGS MA
2d
IS20MA-6B51
#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA
0d
OC20MA-6D35#
SUMMARY FINA L ASSEMBLING STEAM TURBINE MA-
23d
08-Okt-17
30-Okt-17
OC20MAV6-71
LUBE OIL FLUSHING (INCL. PRESSURE TEST)
21d
31-Okt-17
20-Nov-17
SI20MA-8-25#
COLD COMMISSIONING ST
64d
28-Nov-17
30-Jan-18
SI20MA-9-05
1ST. TURNING GEAR ST 20
0d
31-Jan-18
Block 1 UNIT 10 SP10MA-3-25
13-Aug-17
SUMMARY ERECTION ST SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA
SUMMARY ERECTION K-TURBINE MA SUMMARY ERECTION LP STEAM TURBINE MA PLACING K-TURBINE MA
12-Aug-17
#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA
14-Aug-17
PLACING LP1-TURBINE SHAFT IN BEARINGS MA
14-Aug-17
#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA SUMMARY FINA L ASSEMBLING STEAM TURBINE MALUBE OIL FLUSHING (INCL. PRESSURE TEST) COLD COMMISSIONING ST 1ST. TURNING GEAR ST 20
886d
25-Aug-15 A
27-Jan-18
886d
25-Aug-15 A
27-Jan-18
DETAIL DESIGN / MANUFA CTURING / ASSEMBLY HI-L- STEAM TURBINE 487d & ST-AUXILIARIES 25-Aug-15 A 10MA 23-Dez-16 A
DETAIL DESIGN / MANUFACTURING / ASSEMBLY HI-L- STEAM TURBINE & ST-AUXILIARIES 10MA
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
Layout Name : EG1019_Level2 Dur.
Start
Finish
SI10MA-4C41
TRANSPORT ST LP OUTER CASING INDONESIA-SITE
37d
06-Nov-16 A
13-Dez-16 A
SI10MA-4-25
TRANSPORT LP/HP-ST MA NSP - SITE
25d
31-Dez-16 A
25-Jan-17 A
OC10MA-6-15#
SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA 58d
14-Mrz-17 A
10-Mai-17 A
OC10MA-6A15#
SUMMARY ERECTION ST
259d
14-Mrz-17 A
27-Nov-17
OC10MA-6-07
PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA
11d
25-Mrz-17 A
05-Apr-17 A
OC10MA-6C15#
SUMMARY ERECTION K-TURBINE MA
21d
26-Apr-17 A
16-Mai-17 A
SI10MA-6C10
PLACING K-TURBINE MA
0d
02-Mai-17 A
OC10MA-6B15#
SUMMARY ERECTION LP STEAM TURBINE MA
144d
13-Mai-17 A
03-Okt-17
OC10MA-6B47
PLACING LP1-TURBINE PEDESTALS MA
10d
14-Mai-17 A
23-Mai-17 A
IO10MA-6B49
#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA 0d
SI10MA-6B16
PLACING LP1-TURBINE SHAFT IN BEARINGS MA
2d
IS10MA-6B51
#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA
0d
OC10MA-6D35#
SUMMARY FINA L ASSEMBLING STEAM TURBINE MA-
23d
08-Okt-17
30-Okt-17
OC10MAV6-71
LUBE OIL FLUSHING (INCL. PRESSURE TEST)
21d
31-Okt-17
20-Nov-17
SI10MA-8-25#
COLD COMMISSIONING ST
60d
28-Nov-17
26-Jan-18
SI10MA-9-05
1ST. TURNING GEAR ST 10
0d
27-Jan-18
ST Generator MKA Block 4 UNIT 40
13-Aug-17
22-Dez-17
371d
28-Mrz-16 A
02-Apr-17 A
28d
10-Apr-17 A
08-Mai-17 A
OC40MKA6-80#
SUMMARY FINA L ASSEMBLING AND TESTING GENERATOR
0d
04-Dez-17
22-Dez-17
12-Feb-16 A
08-Jan-18
697d
12-Feb-16 A
08-Jan-18
389d
12-Feb-16 A
06-Mrz-17 A
36d
14-Mrz-17 A
18-Apr-17 A
SI30MKA4-21
TRANSPORT ST GENERATO R 30MKA NSP - SITE
OC30MKA6-15#
SUMMARY ERECTION GENERATOR 30MKA (INCL. PREPARATION FOUNDATION) 181d 01-Mai-17 A
OC30MKA6-20
GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING
OC30MKA6-80#
SUMMARY FINA L ASSEMBLING AND TESTING GENERATOR
21-Dez-17
08-Jan-18
21-Dez-15 A
11-Dez-17
722d
21-Dez-15 A
11-Dez-17
316d
21-Dez-15 A
31-Okt-16 A
75d
08-Nov-16 A
22-Jan-17 A
SI20MKA4-21
TRANSPORT ST GENERATO R 20MKA NSP - SITE
OC20MKA6-15#
SUMMARY ERECTION GENERATOR 20MKA (INCL. PREPARATION FOUNDATION) 209d 01-Apr-17 A
OC20SMM6-15
ERECTION CRANE 20SMM02FOR UMA
OC20MKA6-20 OC20MKA6-80#
14-Apr-17 A
GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING
0d
13-Aug-17
SUMMARY FINA L ASSEMBLING AND TESTING GENERATOR
19d
23-Nov-17
11-Dez-17
764d
09-Nov-15 A
11-Dez-17
764d
09-Nov-15 A
11-Dez-17
307d
09-Nov-15 A
10-Sep-16 A
21d
12-Okt-16 A
02-Nov-16 A
SP10MKA3-25
MANUFACTURING ST GENERATO R 10MKA
SI10MKA4-21
TRANSPORT ST GENERATO R 10MKA NSP - SITE
OC10MKA6-15#
SUMMARY ERECTION GENERATOR 10MKA (INCL. PREPARATION FOUNDATION) 184d 01-Apr-17 A
OC10MKA6-20
GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING
OC10MKA6-80#
SUMMARY FINA L ASSEMBLING AND TESTING GENERATOR
DESIGN / MANUFA CTURING S T CONDENSER 40MAG
SI40MAG4-25
TRANSPORT CONDENSER 40MAG BANTEN-SITE
OC40MAG6-20#
SUMMARY ERECTION CONDENSER 40MA G10
Block 3 UNIT 30 SP30MAG3-25
DESIGN / MANUFA CTURING S T CONDENSER 30MAG
SI30MAG4-25
TRANSPORT CONDENSER 30MAG BANTEN-SITE
OC30MAG6-20#
SUMMARY ERECTION CONDENSER 30MA G10
Block 2 UNIT 20 SP20MAG3-25
DESIGN / MANUFA CTURING S T CONDENSER 20MAG
SI20MAG4-25
TRANSPORT CONDENSER 20MAG BANTEN-SITE
OC20MAG6-20#
SUMMARY ERECTION CONDENSER 20MA G10
Block 1 UNIT 10 SP10MAG3-25
DESIGN / MANUFA CTURING S T CONDENSER 10MAG
SI10MAG4-25
TRANSPORT CONDENSER 10MAG BANTEN-SITE
OC10MAG6-20#
SUMMARY ERECTION CONDENSER 10MA G10
Lube Oil / Lifting Oil System MAV Block 4 UNIT 40 OC40MAV6-55
Block 3 UNIT 30
LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST
MANUFACTURING ST GENERATO R 30MKA TRANSPORT ST GENERATO R 30MKA NSP - SITE SUMMARY ERECTION GENERATOR 30MKA (INCL. PREPARATION FOUNDATION)
SUMMARY FINAL ASSEMBLING AND TESTING GENERATOR
MANUFACTURING ST GENERATO R 20MKA TRANSPORT ST GENERATO R 20MKA NSP - SITE
26-Okt-17
6d
SP40MAG3-25
SUMMARY FINA L ASSEMBLING AND TESTING GENERATOR
GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING
19d
MANUFACTURING ST GENERATO R 20MKA
Block 4 UNIT 40
SUMMARY ERECTION GENERATOR 40MKA (INCL. PREPARATION FOUNDATION)
27-Aug-17
SP20MKA3-25
Condensing System Water Cooled for CT or OC MAG
TRANSPORT ST GENERATO R 40MKA NSP - SITE
28-Okt-17
722d
0d
MANUFACTURING ST GENERATO R 40MKA
GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING
19d
MANUFACTURING ST GENERATO R 30MKA
Block 1 UNIT 10
COLD COMMISSIONING ST
22-Aug-17*
SP30MKA3-25
Block 2 UNIT 20
LUBE OIL FLUSHING (INCL. PRESSURE TEST)
22-Dez-17
697d
0d
SUMMARY FINA L ASSEMBLING STEAM TURBINE MA-
1ST. TURNING GEAR ST 10
22-Dez-17
GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING
Block 3 UNIT 30
#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA
28-Mrz-16 A
OC40MKA6-20
SUMMARY ERECTION LP STEAM TURBINE MA PLACING LP1-TURBINE PEDESTALS MA
PLACING LP1-TURBINE SHAFT IN BEARINGS MA
28-Mrz-16 A
SUMMARY ERECTION GENERATOR 40MKA (INCL. PREPARATION FOUNDATION) 224d 13-Mai-17 A
SUMMARY ERECTION K-TURBINE MA
14-Aug-17
635d
OC40MKA6-15#
SUMMARY ERECTION ST PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA
#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA
635d
TRANSPORT ST GENERATO R 40MKA NSP - SITE
SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA
14-Aug-17
08-Jan-18
SI40MKA4-21
TRANSPORT LP/HP-ST MA NSP - SITE
12-Aug-17
09-Nov-15 A
MANUFACTURING ST GENERATO R 40MKA
TRANSPORT ST LP OUTER CASING INDONESIA-SITE
PLACING K-TURBINE MA
792d
SP40MKA3-25
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 15 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
SUMMARY ERECTION GENERATOR 20MKA (INCL. PREPARATION FOUNDATION)
20-Apr-17 A
ERECTION CRANE 20SMM02FOR UMA GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING SUMMARY FINA L ASSEMBLING AND TESTING GENERATOR
MANUFACTURING ST GENERATO R 10MKA TRANSPORT ST GENERATO R 10MKA NSP - SITE
01-Okt-17
SUMMARY ERECTION GENERATOR 10MKA (INCL. PREPARATION FOUNDATION)
06-Aug-17*
GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING
19d
23-Nov-17
11-Dez-17
759d
18-Okt-15 A
14-Nov-17
627d
12-Feb-16 A
30-Okt-17
627d
12-Feb-16 A
30-Okt-17
332d
12-Feb-16 A
08-Jan-17 A
34d
19-Jan-17 A
21-Feb-17 A
231d
14-Mrz-17 A
30-Okt-17
654d
19-Jan-16 A
02-Nov-17
654d
19-Jan-16 A
02-Nov-17
332d
19-Jan-16 A
15-Dez-16 A
26d
30-Dez-16 A
25-Jan-17 A
235d
13-Mrz-17 A
02-Nov-17
717d
29-Nov-15 A
14-Nov-17
717d
29-Nov-15 A
14-Nov-17
313d
29-Nov-15 A
07-Okt-16 A
53d
06-Nov-16 A
28-Dez-16 A
284d
04-Feb-17 A
14-Nov-17
733d
18-Okt-15 A
19-Okt-17
733d
18-Okt-15 A
19-Okt-17
332d
18-Okt-15 A
13-Sep-16 A
31d
05-Nov-16 A
05-Dez-16 A
312d
12-Dez-16 A
19-Okt-17
60d
12-Sep-17
10-Nov-17
14d
26-Okt-17
08-Nov-17
14d
26-Okt-17
08-Nov-17
14d
26-Okt-17
08-Nov-17
14d
28-Okt-17
10-Nov-17
14d
28-Okt-17
10-Nov-17
SUMMARY FINAL ASSEMBLING AND TESTING GENERATOR
DESIGN / MANUFA CTURING S T CONDENSER 40MAG TRANSPORT CONDENSER 40MAG BANTEN-SITE SUMMARY ERECTION CONDENSER 40MA G10
DESIGN / MANUFACTURING ST CONDENSER 30MAG TRANSPORT CONDENSER 30MAG BANTEN-SITE SUMMARY ERECTION CONDENSER 30MAG10
DESIGN / MANUFACTURING ST CONDENSER 20MAG TRANSPORT CONDENSER 20MAG BANTEN-SITE SUMMARY ERECTION CONDENSER 20MAG10
DESIGN / MANUFA CTURING S T CONDENSER 10MAG TRANSPORT CONDENSER 10MAG BANTEN-SITE SUMMARY ERECTION CONDENSER 10MAG10
LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
OC30MAV6-55
Activity Name
LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST
Block 2 UNIT 20 OC20MAV6-55
LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST
Block 1 UNIT 10 OC10MAV6-55
LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST
Piling UMA Area Block 4 UNIT 40
Layout Name : EG1019_Level2 Dur.
Start
Finish
14d
28-Okt-17
10-Nov-17
14d
12-Sep-17
25-Sep-17
14d
12-Sep-17
25-Sep-17
14d
12-Sep-17
25-Sep-17
14d
12-Sep-17
25-Sep-17
14d
12-Sep-17
25-Sep-17
14d
12-Sep-17
25-Sep-17
434d
05-Jan-16 A
14-Mrz-17 A
189d
17-Jan-16 A
24-Jul-16 A
189d
17-Jan-16 A
24-Jul-16 A
OC40UMA5A00
PILING TS FOUNDATION 40UMA + TESTING
47d
17-Jan-16 A
04-Mrz-16 A
OC40UMA5-00
PILING BUILDING FOUNDATION 40UMA + TESTING
40d
24-Jan-16 A
04-Mrz-16 A
OC40UAH5-00
PILING 40UAH + TESTING (Stone Columns)
13d
21-Apr-16 A
04-Mai-16 A
OC40UBF5-00
PILING 40UBF A ND 40UBD02 + TESTING
8d
16-Jul-16 A
24-Jul-16 A
329d
05-Jan-16 A
28-Nov-16 A
Block 3 UNIT 30
329d
05-Jan-16 A
28-Nov-16 A
OC30UMA5-00
PILING BUILDING FOUNDATION 30UMA + TESTING
40d
05-Jan-16 A
14-Feb-16 A
OC30UMA5A00
PILING TS FOUNDATION 30UMA + TESTING
24d
17-Feb-16 A
12-Mrz-16 A
OC30UAH5-00
PILING 30UAH + TESTING (Stone Columns)
OC30UBF5-00
PILING 30UBF A ND 30UBD02 + TESTING
Block 2 UNIT 20
1d
13-Mai-16 A
14-Mai-16 A
108d
13-Aug-16 A
28-Nov-16 A
265d
23-Feb-16 A
14-Nov-16 A
265d
23-Feb-16 A
14-Nov-16 A
OC20UMA5A00
PILING TS FOUNDATION 20UMA + TESTING
21d
23-Feb-16 A
15-Mrz-16 A
OC20UMA5-00
PILING BUILDING FOUNDATION 20UMA + TESTING
60d
23-Feb-16 A
23-Apr-16 A
OC20UAH5-00
PILING 20UAH + TESTING (Stone Coulmns)
2d
23-Mai-16 A
25-Mai-16 A
OC20UBF5-00
PILING 20UBF A ND 20UBD02 + TESTING
Block 1 UNIT 10
31d
14-Okt-16 A
14-Nov-16 A
364d
15-Mrz-16 A
14-Mrz-17 A
364d
15-Mrz-16 A
14-Mrz-17 A
OC10UMA5A00
PILING TS FOUNDATION 10UMA + TESTING
17d
15-Mrz-16 A
01-Apr-16 A
OC10UMA5-00
PILING BUILDING FOUNDATION 10UMA + TESTING
50d
01-Apr-16 A
21-Mai-16 A
OC10UAH5-00
PILING 10UAH + TESTING (Stone Columns)
2d
27-Mai-16 A
29-Mai-16 A
OC10UBF5-00
PILING 10UBF A ND 10UBD02 + TESTING
146d
19-Okt-16 A
14-Mrz-17 A
543d
14-Mrz-16 A
07-Sep-17
403d
01-Aug-16 A
07-Sep-17
403d
01-Aug-16 A
07-Sep-17
336d
01-Aug-16 A
02-Jul-17 A
Transformer for ST BAT Block 4 UNIT 40 SI40BAT3-25
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 40BAT *
OC40UBF5-15
CONSTRUCTION FOUNDATION 40UBF
13d
27-Apr-17 A
10-Mai-17 A
OC40UBF5E15
WALLS & PADS 40UBF
15d
13-Mai-17 A
27-Mai-17 A
SI40BAT4-25
TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 40BAT * 11d
03-Jul-17 A
13-Jul-17 A
OC40BAT7-15
ERECTION GENERATOR TRANSFORMER 40BAT01
Block 3 UNIT 30
35d
04-Aug-17*
07-Sep-17
397d
17-Jun-16 A
19-Jul-17 A
397d
17-Jun-16 A
19-Jul-17 A
290d
17-Jun-16 A
03-Apr-17 A
SI30BAT3-25
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 30BAT *
OC30UBF5-15
CONSTRUCTION FOUNDATION 30UBF
11d
12-Feb-17 A
23-Feb-17 A
OC30UBF5E15
WALLS & PADS 30UBF
20d
24-Feb-17 A
15-Mrz-17 A
SI30BAT4-25
TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 30BAT * 22d
04-Apr-17 A
25-Apr-17 A
OC30BAT7-15
ERECTION GENERATOR TRANSFORMER 30BAT01
Block 2 UNIT 20
35d
14-Jun-17 A
19-Jul-17 A
450d
23-Apr-16 A
17-Jul-17 A
450d
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 16 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST
LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST
LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST
PILING TS FOUNDATION 40UMA + TESTING PILING BUILDING FOUNDATION 40UMA + TESTING PILING 40UAH + TESTING (Stone Columns) PILING 40UBF A ND 40UBD02 + TESTING
PILING BUILDING FOUNDATION 30UMA + TESTING PILING TS FOUNDATION 30UMA + TESTING PILING 30UAH + TESTING (Stone Columns) PILING 30UBF A ND 30UBD02 + TESTING
PILING TS FOUNDATION 20UMA + TESTING PILING BUILDING FOUNDATION 20UMA + TESTING PILING 20UAH + TESTING (Stone Coulmns) PILING 20UBF AND 20UBD02 + TESTING
PILING TS FOUNDATION 10UMA + TESTING PILING BUILDING FOUNDATION 10UMA + TESTING PILING 10UAH + TESTING (Stone Columns) PILING 10UBF AND 10UBD02 + TESTING
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 40BAT * CONSTRUCTION FOUNDATION 40UBF WALLS & PADS 40UBF TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 40BAT * ERECTION GENERATOR TRANSFORMER 40BAT01
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 30BAT * CONSTRUCTION FOUNDATION 30UBF WALLS & PADS 30UBF TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 30BAT * ERECTION GENERATOR TRANSFORMER 30BAT01
23-Apr-16 A
17-Jul-17 A
SI20BAT3-25
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 20BAT *
316d
23-Apr-16 A
04-Mrz-17 A
SI20BAT4-25
TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 20BAT * 26d
05-Mrz-17 A
30-Mrz-17 A
OC20UBF5-15
CONSTRUCTION FOUNDATION 20UBF
3d
29-Mrz-17 A
01-Apr-17 A
CONSTRUCTION FOUNDATION 20UBF
OC20UBF5E15
WALLS & PADS 20UBF
19d
04-Apr-17 A
23-Apr-17 A
WALLS & PADS 20UBF
OC20BAT7-15
ERECTION GENERATOR TRANSFORMER 20BAT01
40d
07-Jun-17 A
17-Jul-17 A
479d
14-Mrz-16 A
05-Jul-17 A
479d
Block 1 UNIT 10
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 20BAT * TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 20BAT *
ERECTION GENERATOR TRANSFORMER 20BAT01
14-Mrz-16 A
05-Jul-17 A
SI10BAT3-25
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 10BAT *
288d
14-Mrz-16 A
26-Dez-16 A
SI10BAT4-25
TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 10BAT * 39d
27-Dez-16 A
04-Feb-17 A
OC10UBF5-15
CONSTRUCTION FOUNDATION 10UBF
10d
17-Mrz-17 A
26-Mrz-17 A
CONSTRUCTION FOUNDATION 10UBF
OC10UBF5E15
WALLS & PADS 10UBF
7d
29-Mrz-17 A
05-Apr-17 A
WALLS & PADS 10UBF
OC10BAT7-15
ERECTION GENERATOR TRANSFORMER 10BAT01
48d
19-Mai-17 A
05-Jul-17 A
448d
08-Nov-16 A
29-Jan-18
442d
08-Nov-16 A
23-Jan-18
442d
08-Nov-16 A
23-Jan-18
4d
08-Nov-16 A
12-Nov-16 A
27d
23-Jun-17 A
19-Jul-17 A
PCC for ST Block 4 UNIT 40 OC40UBA5-15
FOUNDATION 40UBA/UBD (INCL. UBZ OPENING)
SI40UBA4H25
TRANSPORT PCC 40UBA 4210/4310/4410/4510/4610 NSP - SITE
SI40UBA8G25
ELECTRICAL COMMISSIONING UBA4110
SI40UBA8-25#
COMMISSIONING ELECTRICAL SYSTE MS (ST)
Block 3 UNIT 30
14d
13-Sep-17
26-Sep-17
116d
30-Sep-17
23-Jan-18
434d
22-Nov-16 A
29-Jan-18
434d
22-Nov-16 A
29-Jan-18
OC30UBA5-15
FOUNDATION 30UBA/UBD (INCL. UBZ OPENING)
16d
22-Nov-16 A
07-Dez-16 A
SI30UBA4H25
TRANSPORT PCC 30UBA 4210/4310/4410/4510/4610 NSP - SITE
25d
24-Mai-17 A
17-Jun-17 A
SI30UBA8G25
ELECTRICAL COMMISSIONING UBA4110
14d
31-Aug-17
13-Sep-17
SI30UBA8-25#
COMMISSIONING ELECTRICAL SYSTE MS (ST)
120d
02-Okt-17
29-Jan-18
MANUFACTURING, SHOP TEST MAIN TRANSFORMER 10BAT * TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 10BAT *
ERECTION GENERATOR TRANSFORMER 10BAT01
FOUNDATION 40UBA/UBD (INCL. UBZ OPENING) TRANSPORT PCC 40UBA 4210/4310/4410/4510/4610 NSP - SITE ELECTRICAL COMMISSIONING UBA4110 COMMISSIONING ELECTRICAL SYSTE MS (ST)
FOUNDATION 30UBA/UBD (INCL. UBZ OPENING) TRANSPORT PCC 30UBA 4210/4310/4410/4510/4610 NSP - SITE ELECTRICAL COMMISSIONING UBA4110 COMMISSIONING ELECTRICAL SYSTE MS (ST)
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
Block 2 UNIT 20
Layout Name : EG1019_Level2 Dur.
Start
Finish
367d
11-Jan-17 A
12-Jan-18
367d
11-Jan-17 A
12-Jan-18
OC20UBA5-15
FOUNDATION 20UBA/UBD (INCL. UBZ OPENING)
13d
11-Jan-17 A
24-Jan-17 A
SI20UBA4H25
TRANSPORT PCC 20UBA 4210/4310/4410/4510/4610 NSP - SITE
24d
15-Mrz-17 A
07-Apr-17 A
SI20UBA8G25
ELECTRICAL COMMISSIONING 20UBA4110
SI20UBA8-25#
COMMISSIONING ELECTRICAL SYSTE MS (ST)
Block 1 UNIT 10
14d
12-Aug-17
25-Aug-17
135d
31-Aug-17
12-Jan-18
356d
11-Jan-17 A
01-Jan-18
356d
11-Jan-17 A
01-Jan-18
OC10UBA5-15
FOUNDATION 10UBA/UBD (INCL. UBZ OPENING)
21d
11-Jan-17 A
31-Jan-17 A
SI10UBA4H25
TRANSPORT PCC 10UBA 4210/4310/4410/4510/4610 NSP - SITE
22d
11-Feb-17 A
04-Mrz-17 A
SI10UBA8-25#
COMMISSIONING ELECTRICAL SYSTE MS (ST)
166d
20-Jul-17 A
01-Jan-18
SI10UBA8G25
ELECTRICAL COMMISSIONING 10UBA4110
14d
05-Aug-17
18-Aug-17
237d
29-Mrz-17 A
20-Nov-17
120d
12-Jul-17 A
08-Nov-17
120d
12-Jul-17 A
08-Nov-17
120d
12-Jul-17 A
08-Nov-17
150d
24-Jun-17 A
20-Nov-17
150d
24-Jun-17 A
20-Nov-17
150d
24-Jun-17 A
20-Nov-17
168d
22-Mai-17 A
05-Nov-17
168d
22-Mai-17 A
05-Nov-17
168d
22-Mai-17 A
05-Nov-17
196d
29-Mrz-17 A
10-Okt-17
196d
29-Mrz-17 A
10-Okt-17
196d
29-Mrz-17 A
10-Okt-17
574d
05-Mrz-16 A
29-Sep-17
456d
01-Jul-16 A
29-Sep-17
456d
01-Jul-16 A
29-Sep-17
Electrical Installations in UMA Block 4 UNIT 40 OC40B--7-15#
SUMMARY ELECTRICAL ERECTION 40UMA
Block 3 UNIT 30 OC30B--7-15#
SUMMARY ELECTRICAL ERECTION 30UMA
Block 2 UNIT 20 OC20B--7-15#
SUMMARY ELECTRICAL ERECTION 20UMA
Block 1 UNIT 10 OC10B--7-15#
SUMMARY ELECTRICAL ERECTION 10UMA
Condensate Extraction Pump LCB Block 4 UNIT 40 SI40LCB3B25
DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION 308d 01-Jul-16 PUMP 40LCB A (w/o 04-Mai-17 MPA ) A
SI40LCB4B25
TRANSPORT CONDENSATE EXTRACTION PUMP 40LCB INDIA-SITE
28d
05-Mai-17 A
01-Jun-17 A
OC40LCB6B15
ERECTION CONDENSATE EXTRACTION PUMP 40LCB
28d
02-Sep-17
29-Sep-17
402d
17-Jun-16 A
24-Jul-17 A
402d
17-Jun-16 A
24-Jul-17 A
Block 3 UNIT 30 SI30LCB3B25
DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION 316d 17-Jun-16 PUMP 30LCB A (w/o 28-Apr-17 MPA ) A
SI30LCB4B25
TRANSPORT CONDENSATE EXTRACTION PUMP 30LCB INDIA-SITE
OC30LCB6B15
ERECTION CONDENSATE EXTRACTION PUMP 30LCB
Block 2 UNIT 20
34d
29-Apr-17 A
01-Jun-17 A
6d
18-Jul-17 A
24-Jul-17 A
449d
01-Mai-16 A
24-Jul-17 A
449d
01-Mai-16 A
24-Jul-17 A
SI20LCB3B25
DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION 302d 01-Mai-16 PUMP 20LCB A (w/o 27-Feb-17 MPA ) A
SI20LCB4B25
TRANSPORT CONDENSATE EXTRACTION PUMP 20LCB KOREA-SITE 58d
28-Feb-17 A
26-Apr-17 A
OC20LCB6B15
ERECTION CONDENSATE EXTRACTION PUMP 20LCB
58d
27-Mai-17 A
24-Jul-17 A
476d
05-Mrz-16 A
24-Jun-17 A
476d
05-Mrz-16 A
24-Jun-17 A
Block 1 UNIT 10 SI10LCB3B25
DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION 320d 05-Mrz-16 PUMP 10LCB A (w/o 18-Jan-17 MPA ) A
SI10LCB4B25
TRANSPORT CONDENSATE EXTRACTION PUMP 10LCB KOREA-SITE 24d
19-Jan-17 A
11-Feb-17 A
OC10LCB6B15
ERECTION CONDENSATE EXTRACTION PUMP 10LCB
52d
03-Mai-17 A
24-Jun-17 A
856d
08-Dez-15 A
11-Apr-18
309d
08-Dez-15 A
11-Okt-16 A
309d
08-Dez-15 A
11-Okt-16 A
277d
24-Dez-15 A
25-Sep-16 A
BOILER AREA Piling HRSG Area Block 4 UNIT 42 OC42UHA5-00
PILING 42UHA + TESTING
72d
24-Dez-15 A
05-Mrz-16 A
OC42UHY5-00
PILING PIPE BRIDGE 41/42UHY + TESTING
90d
28-Jun-16 A
25-Sep-16 A
79d
08-Dez-15 A
25-Feb-16 A
79d
08-Dez-15 A
25-Feb-16 A
20d
22-Sep-16 A
11-Okt-16 A
UNIT 41 OC41UHA5-00
PILING 41UHA + TESTING
UNIT 40 OC40ULA5-00
PILING 40ULA + TESTING
Block 3 UNIT 32
20d
22-Sep-16 A
11-Okt-16 A
203d
23-Dez-15 A
13-Jul-16 A 28-Jun-16 A
181d
30-Dez-15 A
OC32UHA5-00
PILING 32UHA + TESTING
90d
30-Dez-15 A
29-Mrz-16 A
OC32UHY5-00
PILING PIPE BRIDGE 31/32UHY + TESTING
20d
08-Jun-16 A
28-Jun-16 A
99d
23-Dez-15 A
31-Mrz-16 A
99d
23-Dez-15 A
31-Mrz-16 A
16d
27-Jun-16 A
13-Jul-16 A
UNIT 31 OC31UHA5-00
PILING 31UHA + TESTING
UNIT 30 OC30ULA5-00
PILING 30ULA + TESTING
Block 2 UNIT 22
16d
27-Jun-16 A
13-Jul-16 A
209d
11-Feb-16 A
07-Sep-16 A 16-Aug-16 A
186d
12-Feb-16 A
OC22UHA5-00
PILING 22UHA + TESTING
82d
12-Feb-16 A
04-Mai-16 A
OC22UHY5-00
PILING PIPE BRIDGE 21/22UHY + TESTING
31d
16-Jul-16 A
16-Aug-16 A
76d
11-Feb-16 A
27-Apr-16 A
76d
11-Feb-16 A
27-Apr-16 A
40d
29-Jul-16 A
07-Sep-16 A
UNIT 21 OC21UHA5-00
PILING 21UHA + TESTING
UNIT 20 OC20ULA5-00
PILING 20ULA + TESTING
Block 1 UNIT 11 OC11UHA5-00
PILING 11UHA + TESTING
40d
29-Jul-16 A
07-Sep-16 A
149d
14-Apr-16 A
10-Sep-16 A
46d
15-Apr-16 A
31-Mai-16 A
46d
15-Apr-16 A
31-Mai-16 A
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 17 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
FOUNDATION 20UBA/UBD (INCL. UBZ OPENING) TRANSPORT PCC 20UBA 4210/4310/4410/4510/4610 NSP - SITE ELECTRICAL COMMISSIONING 20UBA4110 COMMISSIONING ELECTRICAL SYSTE MS (ST)
FOUNDATION 10UBA/UBD (INCL. UBZ OPENING) TRANSPORT PCC 10UBA 4210/4310/4410/4510/4610 NSP - SITE COMMISSIONING ELECTRICAL SYSTE MS (ST) ELECTRICAL COMMISSIONING 10UBA4110
SUMMARY ELECTRICAL ERECTION 40UMA
SUMMARY ELECTRICAL ERECTION 30UMA
SUMMARY ELECTRICAL ERECTION 20UMA
SUMMARY ELECTRICAL ERECTION 10UMA
DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION PUMP 40LCB (w/o MPA ) TRANSPORT CONDENSATE EXTRACTION PUMP 40LCB INDIA-SITE ERECTION CONDENSATE EXTRACTION PUMP 40LCB
DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION PUMP 30LCB (w/o MPA) TRANSPORT CONDENSATE EXTRACTION PUMP 30LCB INDIA-SITE ERECTION CONDENSATE EXTRACTION PUMP 30LCB
DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION PUMP 20LCB (w/o MPA ) TRANSPORT CONDENSATE EXTRACTION PUMP 20LCB KOREA-SITE ERECTION CONDENSATE EXTRACTION PUMP 20LCB
DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION PUMP 10LCB (w/o MPA ) TRANSPORT CONDENSATE EXTRACTION PUMP 10LCB KOREA-SITE ERECTION CONDENSATE EXTRACTION PUMP 10LCB
PILING 42UHA + TESTING PILING PIPE BRIDGE 41/42UHY + TESTING
PILING 41UHA + TESTING
PILING 40ULA + TESTING
PILING 32UHA + TESTING PILING PIPE BRIDGE 31/32UHY + TESTING
PILING 31UHA + TESTING
PILING 30ULA + TESTING
PILING 22UHA + TESTING PILING PIPE BRIDGE 21/22UHY + TESTING
PILING 21UHA + TESTING
PILING 20ULA + TESTING
PILING 11UHA + TESTING
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
Layout Name : EG1019_Level2 Dur.
Start
Finish
10-Sep-16 A
149d
14-Apr-16 A
OC12UHA5-00
PILING 12UHA + TESTING
45d
14-Apr-16 A
29-Mai-16 A
OC12UHY5-00
PILING PIPE BRIDGE 11/12UHY + TESTING
18d
23-Aug-16 A
10-Sep-16 A
5d
03-Sep-16 A
08-Sep-16 A
UNIT 12
UNIT 10 OC10ULA5-00
PILING 10ULA + TESTING
Piling UEY Area Block 4 UNIT 42 OC42UEY5-00
PILING PIPE BRIDGE 40/41/42UEY + TESTING
Block 3 UNIT 32 OC32UEY5-00
PILING PIPE BRIDGE 30/31/32UEY + TESTING
Block 2 UNIT 22 OC22UEY5-00
PILING PIPE BRIDGE 20/21/22UEY + TESTING
Block 1 UNIT 12 OC12UEY5-00
PILING PIPE BRIDGE 10/11/12UEY + TESTING
HRSG Block 4 UNIT 42
5d
03-Sep-16 A
08-Sep-16 A
251d
05-Feb-16 A
12-Okt-16 A
50d
29-Feb-16 A
19-Apr-16 A
50d
29-Feb-16 A
19-Apr-16 A
50d
29-Feb-16 A
19-Apr-16 A
47d
17-Apr-16 A
03-Jun-16 A
47d
17-Apr-16 A
03-Jun-16 A
47d
17-Apr-16 A
03-Jun-16 A
228d
05-Feb-16 A
20-Sep-16 A
228d
05-Feb-16 A
20-Sep-16 A
228d
05-Feb-16 A
20-Sep-16 A
236d
20-Feb-16 A
12-Okt-16 A
236d
20-Feb-16 A
12-Okt-16 A
236d
20-Feb-16 A
12-Okt-16 A
767d
06-Mrz-16 A
11-Apr-18
767d
06-Mrz-16 A
11-Apr-18
764d
09-Mrz-16 A
11-Apr-18
0d
09-Mrz-16 A
22d
09-Mrz-16 A
OC42UHA5-10
(H) START PLACING FORMWORK 42UHA
OC42UHA5-15
CONSTRUCTION FOUNDATION 42UHA
OC42UHA5-45
(RFE) FOUNDATION 42UHA
SI42HB-3A25
MANUFACTURING MAIN STE EL STRUCTURE HRSG42
SI42HB-4A25
TRANSPORT MAIN STEEL STRUCTURE HRSG42 THAILAND-SITE
SI42HB-4A40
ON SITE MAIN STEEL STRUCTURE HRSG 42 (FRAME / CASING)
OC42HB-6-15#
SUMMARY ERECTION HRSG 42
SI42HA-4G40
ON SITE FIRST HEATING SURFACES HRSG42
SI42HA-6-56
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 198d 08-Jul-17 A
OC42HA-6A15#
SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 224dINSULATION) 11-Jul-17 A HRSG42 19-Feb-18
OC42HA-6-55
PRESSURE TEST HRSG42
SI42HA-6-70&
HRSG42 - READY FOR HOT GAS / AUGMENTED BYPASS OP
UNIT 41
0d
47d
01-Feb-17 A
19-Mrz-17 A
0d
20-Mrz-17 A
349d
30-Mrz-17 A
0d
PILING PIPE BRIDGE 20/21/22UEY + TESTING
PILING PIPE BRIDGE 10/11/12UEY + TESTING
CONSTRUCTION FOUNDATION 42UHA (RFE) FOUNDATION 42UHA MANUFACTURING MAIN STEEL STRUCTURE HRSG42 TRANSPORT MAIN STEEL STRUCTURE HRSG42 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 42 (FRAME / CASING) SUMMARY ERECTION HRSG 42
28-Dez-17
0d
ON SITE FIRST HEATING SURFACES HRSG42
21-Jan-18
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) SUMMARY ERECTION PRESSURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG42
21-Jan-18
PRESSURE TEST HRSG42
11-Apr-18 06-Mrz-16 A
HRSG42 - READY FOR HOT GAS / AUGMENTED BYPASS OP
11-Apr-18
(H) START PLACING FORMWORK 41UHA
0d
06-Mrz-16 A
OC41UHA5-15
CONSTRUCTION FOUNDATION 41UHA
9d
06-Mrz-16 A
OC41UHA5-45
(RFE) FOUNDATION 41UHA
0d
SI41HB-3A25
MANUFACTURING MAIN STE EL STRUCTURE HRSG41
SI41HB-4A25
TRANSPORT MAIN STEEL STRUCTURE HRSG41 THAILAND-SITE
SI41HB-4A40
ON SITE MAIN STEEL STRUCTURE HRSG 41 (FRAME / CASING)
OC41HB-6-15#
SUMMARY ERECTION HRSG 41
SI41HA-4G40
ON SITE FIRST HEATING SURFACES HRSG41
OC41HA-6A15#
SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 233dINSULATION) 02-Mai-17 HRSG41 A 20-Dez-17
SI41HA-6-56
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 138d 08-Jul-17 A
22-Nov-17
OC41HA-6-55
PRESSURE TEST HRSG41
22-Nov-17
SI41HA-6-70&
HRSG41 - READY FOR HOT GAS / AUGMENTED BYPASS OP
(H) START PLACING FORMWORK 41UHA 15-Mrz-16 A
CONSTRUCTION FOUNDATION 41UHA
15-Mrz-16 A 06-Sep-16 A
11-Jan-17 A
37d
11-Jan-17 A
16-Feb-17 A
0d
17-Feb-17 A
316d
13-Mrz-17 A
0d
(RFE) FOUNDATION 41UHA MANUFACTURING MAIN STEEL STRUCTURE HRSG41 TRANSPORT MAIN STEEL STRUCTURE HRSG41 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 41 (FRAME / CASING)
22-Jan-18
SUMMARY ERECTION HRSG 41
12-Apr-17 A
30-Okt-17
0d
ON SITE FIRST HEATING SURFACES HRSG41 SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG41 INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) PRESSURE TEST HRSG41
11-Apr-18
677d
02-Apr-16 A
07-Feb-18
677d
02-Apr-16 A
07-Feb-18
0d
02-Apr-16 A
12d
02-Apr-16 A
OC32UHA5-10
(H) START PLACING FORMWORK 32UHA
OC32UHA5-15
CONSTRUCTION FOUNDATION 32UHA
OC32UHA5-45
(RFE) FOUNDATION 32UHA
SI32HB-3A25
MANUFACTURING MAIN STE EL STRUCTURE HRSG32
SI32HB-4A25
TRANSPORT MAIN STEEL STRUCTURE HRSG32 THAILAND-SITE
SI32HB-4A40
ON SITE MAIN STEEL STRUCTURE HRSG 32 (FRAME / CASING)
OC32HB-6-15#
SUMMARY ERECTION HRSG 32
SI32HA-4G40
ON SITE FIRST HEATING SURFACES HRSG32
OC32HA-6A15#
SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 211dINSULATION) 24-Apr-17 HRSG32 A 20-Nov-17
SI32HA-6-56
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 108d 08-Jul-17 A
OC32HA-6-55
PRESSURE TEST HRSG32
SI32HA-6-70&
HRSG32 - READY FOR HOT GAS / AUGMENTED BYPASS OP
UNIT 31
PILING PIPE BRIDGE 30/31/32UEY + TESTING
28-Mai-17 A
767d
0d
HRSG41 - READY FOR HOT GAS / AUGMENTED BYPASS OP
(H) START PLACING FORMWORK 32UHA 14-Apr-16 A
CONSTRUCTION FOUNDATION 32UHA
14-Apr-16 A
131d
23-Jul-16 A
30-Nov-16 A
47d
01-Dez-16 A
16-Jan-17 A
0d
17-Jan-17 A
335d
01-Feb-17 A
0d
35d
PILING PIPE BRIDGE 40/41/42UEY + TESTING
13-Mrz-18
OC41UHA5-10
Block 3 UNIT 32
PILING 10ULA + TESTING
31-Mrz-16 A 31-Jan-17 A
24d
PILING PIPE BRIDGE 11/12UHY + TESTING
(H) START PLACING FORMWORK 42UHA
26-Sep-16 A
127d
PILING 12UHA + TESTING
31-Mrz-16 A
128d
25d
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 18 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
(RFE) FOUNDATION 32UHA MANUFACTURING MAIN STEEL STRUCTURE HRSG32 TRANSPORT MAIN STEEL STRUCTURE HRSG32 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 32 (FRAME / CASING)
01-Jan-18
SUMMARY ERECTION HRSG 32
12-Mrz-17 A
19-Sep-17
0d
ON SITE FIRST HEATING SURFACES HRSG32 SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG32
23-Okt-17
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275)
23-Okt-17
PRESSURE TEST HRSG32
07-Feb-18
665d
12-Apr-16 A
0d
12-Apr-16 A
11d
12-Apr-16 A
HRSG32 - READY FOR HOT GAS / AUGMENTED BYPASS OP
05-Feb-18
OC31UHA5-10
(H) START PLACING FORMWORK 31UHA
OC31UHA5-15
CONSTRUCTION FOUNDATION 31UHA
OC31UHA5-45
(RFE) FOUNDATION 31UHA
SI31HB-3A25
MANUFACTURING MAIN STE EL STRUCTURE HRSG31
SI31HB-4A25
TRANSPORT MAIN STEEL STRUCTURE HRSG31 THAILAND-SITE
SI31HB-4A40
ON SITE MAIN STEEL STRUCTURE HRSG 31 (FRAME / CASING)
OC31HB-6-15#
SUMMARY ERECTION HRSG 31
SI31HA-4G40
ON SITE FIRST HEATING SURFACES HRSG31
OC31HA-6A15#
SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 202dINSULATION) 02-Apr-17 HRSG31 A 20-Okt-17
SI31HA-6-56
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 77d 08-Jul-17 A
22-Sep-17
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275)
OC31HA-6-55
PRESSURE TEST HRSG31
22-Sep-17
PRESSURE TEST HRSG31
SI31HA-6-70&
HRSG31 - READY FOR HOT GAS / AUGMENTED BYPASS OP
0d
(H) START PLACING FORMWORK 31UHA 23-Apr-16 A
CONSTRUCTION FOUNDATION 31UHA
23-Apr-16 A
(RFE) FOUNDATION 31UHA
137d
23-Jun-16 A
07-Nov-16 A
47d
17-Nov-16 A
02-Jan-17 A
0d
03-Jan-17 A
363d
04-Jan-17 A
0d
24d 0d
TRANSPORT MAIN STEEL STRUCTURE HRSG31 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 31 (FRAME / CASING)
01-Jan-18 08-Mrz-17 A
30-Aug-17
MANUFACTURING MAIN STE EL STRUCTURE HRSG31
05-Feb-18
SUMMARY ERECTION HRSG 31 ON SITE FIRST HEATING SURFACES HRSG31 SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG31
HRSG31 - READY FOR HOT GAS / AUGMENTED BYPASS OP
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
Block 2 UNIT 22
Layout Name : EG1019_Level2 Dur.
Start
Finish
684d
22-Mrz-16 A
03-Feb-18
626d
19-Mai-16 A
03-Feb-18
OC22UHA5-10
(H) START PLACING FORMWORK 22UHA
0d
19-Mai-16 A
OC22UHA5-15
CONSTRUCTION FOUNDATION 22UHA
6d
19-Mai-16 A
OC22UHA5-45
(RFE) FOUNDATION 22UHA
0d
SI22HB-3A25
MANUFACTURING MAIN STE EL STRUCTURE HRSG22
SI22HB-4A25
TRANSPORT MAIN STEEL STRUCTURE HRSG22 THAILAND-SITE
SI22HB-4A40
ON SITE MAIN STEEL STRUCTURE HRSG 22 (FRAME / CASING)
OC22HB-6-15#
SUMMARY ERECTION HRSG 22
SI22HA-4G40
ON SITE FIRST HEATING SURFACES HRSG22
OC22HA-6A15#
SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 233dINSULATION) 16-Feb-17 HRSG22 A 06-Okt-17
SI22HA-6-56
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 63d 08-Jul-17 A
08-Sep-17
OC22HA-6-55
PRESSURE TEST HRSG22
08-Sep-17
SI22HA-6-70&
HRSG22 - READY FOR HOT GAS / AUGMENTED BYPASS OP
UNIT 21
133d
(H) START PLACING FORMWORK 22UHA 25-Mai-16 A
CONSTRUCTION FOUNDATION 22UHA
25-Mai-16 A 05-Jun-16 A
15-Okt-16 A
31d
16-Okt-16 A
16-Nov-16 A
0d
21-Nov-16 A
383d
03-Dez-16 A
0d
24d
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 19 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
16-Aug-17*
TRANSPORT MAIN STEEL STRUCTURE HRSG22 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 22 (FRAME / CASING)
20-Dez-17 17-Jan-17 A
0d
(RFE) FOUNDATION 22UHA MANUFACTURING MAIN STE EL STRUCTURE HRSG22
SUMMARY ERECTION HRSG 22 ON SITE FIRST HEATING SURFACES HRSG22 SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG22 INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) PRESSURE TEST HRSG22
03-Feb-18
682d
22-Mrz-16 A
01-Feb-18
163d
22-Mrz-16 A
31-Aug-16 A
0d
07-Mai-16 A
13d
07-Mai-16 A
HRSG22 - READY FOR HOT GAS / AUGMENTED BYPASS OP
SI21HB-3A25
MANUFACTURING MAIN STE EL STRUCTURE HRSG21
OC21UHA5-10
(H) START PLACING FORMWORK 21UHA
OC21UHA5-15
CONSTRUCTION FOUNDATION 21UHA
OC21UHA5-45
(RFE) FOUNDATION 21UHA
SI21HB-4A25
TRANSPORT MAIN STEEL STRUCTURE HRSG21 THAILAND-SITE
SI21HB-4A40
ON SITE MAIN STEEL STRUCTURE HRSG 21 (FRAME / CASING)
OC21HB-6-15#
SUMMARY ERECTION HRSG 21
SI21HA-4G40
ON SITE FIRST HEATING SURFACES HRSG21
OC21HA-6A15#
SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 253dINSULATION) 21-Jan-17 HRSG21 A 30-Sep-17
SI21HA-6-56
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 57d 08-Jul-17 A
02-Sep-17
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275)
OC21HA-6-55
PRESSURE TEST HRSG21
02-Sep-17
PRESSURE TEST HRSG21
SI21HA-6-70&
HRSG21 - READY FOR HOT GAS / AUGMENTED BYPASS OP
Block 1 UNIT 11
0d 56d
01-Sep-16 A
0d
24-Okt-16 A
422d
31-Okt-16 A
0d
24d
20-Mai-16 A
CONSTRUCTION FOUNDATION 21UHA
20-Mai-16 A
(RFE) FOUNDATION 21UHA
27-Okt-16 A
10-Aug-17*
26-Dez-17
07-Mrz-16 A
700d
07-Mrz-16 A
04-Feb-18
147d
07-Mrz-16 A
31-Jul-16 A
0d
24-Jul-16 A
MANUFACTURING MAIN STE EL STRUCTURE HRSG11
OC11UHA5-10
(H) START PLACING FORMWORK 11UHA
OC11UHA5-15
CONSTRUCTION FOUNDATION 11UHA
SI11HB-4A25
TRANSPORT MAIN STEEL STRUCTURE HRSG11 THAILAND-SITE
OC11UHA5-45
(RFE) FOUNDATION 11UHA
SI11HB-4A40
ON SITE MAIN STEEL STRUCTURE HRSG 11 (FRAME / CASING)
OC11HB-6-15#
SUMMARY ERECTION HRSG 11
SI11HA-4G40
ON SITE FIRST HEATING SURFACES HRSG11
OC11HA-6A15#
SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 267dINSULATION) 01-Jan-17 HRSG11 A 24-Sep-17
SI11HA-6-56
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 41d 08-Jul-17 A
17-Aug-17
OC11HA-6-55
PRESSURE TEST HRSG11
17-Aug-17
SI11HA-6-70&
HRSG11 - READY FOR HOT GAS / AUG MENTE D BYPASS OP
9d
24-Jul-16 A
02-Aug-16 A
01-Aug-16 A
14-Sep-16 A
0d
02-Aug-16 A
0d
15-Sep-16 A
415d
05-Okt-16 A
0d
24-Jul-17 A
MANUFACTURING MAIN STE EL STRUCTURE HRSG11
CONSTRUCTION FOUNDATION 11UHA TRANSPORT MAIN STEEL STRUCTURE HRSG11 THAILAND-SITE (RFE) FOUNDATION 11UHA ON SITE MAIN STEEL STRUCTURE HRSG 11 (FRAME / CASING)
23-Nov-17 16-Nov-16 A
0d
HRSG21 - READY FOR HOT GAS / AUGMENTED BYPASS OP
(H) START PLACING FORMWORK 11UHA
45d
649d
SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG21
06-Feb-18
SI11HB-3A25
UNIT 12
SUMMARY ERECTION HRSG 21 ON SITE FIRST HEATING SURFACES HRSG21
01-Feb-18
702d
25d
TRANSPORT MAIN STEEL STRUCTURE HRSG21 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 21 (FRAME / CASING)
30-Nov-16 A
0d
MANUFACTURING MAIN STE EL STRUCTURE HRSG21 (H) START PLACING FORMWORK 21UHA
SUMMARY ERECTION HRSG 11 ON SITE FIRST HEATING SURFACES HRSG11 SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG11 INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) PRESSURE TEST HRSG11
04-Feb-18 29-Apr-16 A
06-Feb-18
155d
29-Apr-16 A
30-Sep-16 A
0d
19-Jun-16 A
22d
19-Jun-16 A
HRSG11 - READY FOR HOT GAS / AUG MENTE D BYPASS OP
SI12HB-3A25
MANUFACTURING MAIN STE EL STRUCTURE HRSG12
OC12UHA5-10
(H) START PLACING FORMWORK 12UHA
OC12UHA5-15
CONSTRUCTION FOUNDATION 12UHA
OC12UHA5-45
(RFE) FOUNDATION 12UHA
SI12HB-4A25
TRANSPORT MAIN STEEL STRUCTURE HRSG12 THAILAND-SITE
SI12HB-4A40
ON SITE MAIN STEEL STRUCTURE HRSG 12 (FRAME / CASING)
OC12HB-6-15#
SUMMARY ERECTION HRSG 12
SI12HA-4G40
ON SITE FIRST HEATING SURFACES HRSG12
OC12HA-6A15#
SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 244dINSULATION) 20-Feb-17 HRSG12 A 21-Okt-17
SI12HA-6-56
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 78d 08-Jul-17 A
23-Sep-17
INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275)
OC12HA-6-55
PRESSURE TEST HRSG12
23-Sep-17
PRESSURE TEST HRSG12
SI12HA-6-70&
HRSG12 - READY FOR HOT GAS / AUGMENTED BYPASS OP
Power Control Center HRSG Block 4 UNIT 42
0d 01-Okt-16 A
0d
17-Nov-16 A
364d
25-Nov-16 A
0d
24d
(H) START PLACING FORMWORK 12UHA 10-Jul-16 A 10-Jul-16 A
57d
27-Nov-16 A
31-Aug-17
225d
19-Feb-17 A
01-Okt-17
100d
22-Jun-17 A
29-Sep-17
97d
23-Jun-17 A
27-Sep-17
27d
23-Jun-17 A
19-Jul-17 A
OC42UBA7L15
ERECTION PCC 42UBA1110
28d
31-Aug-17
27-Sep-17
100d
22-Jun-17 A
29-Sep-17
SI41UBA4-25
TRANSPORT PCC 41UBA1110 NSP - SITE
28d
22-Jun-17 A
19-Jul-17 A
OC41UBA7L15
ERECTION PCC 41UBA1110
28d
02-Sep-17
29-Sep-17
134d
21-Mai-17 A
01-Okt-17
134d
21-Mai-17 A
01-Okt-17
SI32UBA4-25
TRANSPORT PCC 32UBA1110 WORKSHOP - SITE
30d
21-Mai-17 A
19-Jun-17 A
OC32UBA7L15
ERECTION PCC 32UBA1110
28d
04-Sep-17
01-Okt-17
93d
21-Mai-17 A
21-Aug-17
UNIT 31 SI31UBA4-25
TRANSPORT PCC 31UBA1110 WORKSHOP - SITE
30d
21-Mai-17 A
19-Jun-17 A
OC31UBA7L15
ERECTION PCC 31UBA1110
31d
22-Jul-17 A
21-Aug-17
170d
14-Mrz-17 A
30-Aug-17
Block 2 UNIT 22
SUMMARY ERECTION HRSG 12 ON SITE FIRST HEATING SURFACES HRSG12 SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG12
06-Feb-18
TRANSPORT PCC 42UBA1110 NSP - SITE
Block 3 UNIT 32
(RFE) FOUNDATION 12UHA TRANSPORT MAIN STEEL STRUCTURE HRSG12 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 12 (FRAME / CASING)
SI42UBA4-25
UNIT 41
CONSTRUCTION FOUNDATION 12UHA
23-Nov-17 13-Dez-16 A
0d
MANUFACTURING MAIN STE EL STRUCTURE HRSG12
170d
14-Mrz-17 A
30-Aug-17
SI22UBA4-25
TRANSPORT PCC 22UBA1110 TO SITE
35d
14-Mrz-17 A
17-Apr-17 A
OC22UBA7L15
ERECTION PCC 22UBA1110
21d
10-Aug-17
30-Aug-17
HRSG12 - READY FOR HOT GAS / AUGMENTED BYPASS OP
TRANSPORT PCC 42UBA1110 NSP - SITE ERECTION PCC 42UBA1110
TRANSPORT PCC 41UBA1110 NSP - SITE ERECTION PCC 41UBA1110
TRANSPORT PCC 32UBA1110 WORKSHOP - SITE ERECTION PCC 32UBA1110
TRANSPORT PCC 31UBA1110 WORKSHOP - SITE ERECTION PCC 31UBA1110
TRANSPORT PCC 22UBA1110 TO SITE ERECTION PCC 22UBA1110
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
Layout Name : EG1019_Level2 Dur.
Start
Finish
152d
14-Mrz-17 A
12-Aug-17
SI21UBA4-25
TRANSPORT PCC 21UBA1110 TO SITE
35d
14-Mrz-17 A
17-Apr-17 A
OC21UBA7L15
ERECTION PCC 21UBA1110
68d
06-Jun-17 A
12-Aug-17
191d
19-Feb-17 A
28-Aug-17 24-Jun-17 A
UNIT 21
Block 1 UNIT 11
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 20 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 TRANSPORT PCC 21UBA1110 TO SITE ERECTION PCC 21UBA1110
125d
19-Feb-17 A
SI11UBA4-25
TRANSPORT PCC 11UBA1110 TO SITE
32d
19-Feb-17 A
22-Mrz-17 A
TRANSPORT PCC 11UBA1110 TO SITE
OC11UBA7L15
ERECTION PCC 11UBA1110
18d
06-Jun-17 A
24-Jun-17 A
ERECTION PCC 11UBA1110
181d
01-Mrz-17 A
28-Aug-17
UNIT 12 SI12UBA4-25
TRANSPORT PCC 12UBA1110 TO SITE
35d
01-Mrz-17 A
04-Apr-17 A
OC12UBA7L15
ERECTION PCC 12UBA1110
21d
08-Aug-17*
28-Aug-17
581d
11-Feb-16 A
13-Sep-17
403d
07-Aug-16 A
13-Sep-17
403d
07-Aug-16 A
Structure for Feed Water Pump ULA Block 4 UNIT 40
ERECTION PCC 12UBA1110
13-Sep-17
SI40LAC3B25
DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 40LAC 320d 07-Aug-16 A
23-Jun-17 A
OC40ULA5-15#
SUMMARY CONSTRUCTION FOUNDATION 40ULA
39d
17-Mai-17 A
24-Jun-17 A
SI40LAC4B25
TRANSPORT FEEDWATER PUMP 40LAC NSP-SITE
18d
25-Jun-17 A
13-Jul-17 A
OC40ULA5B15
ERECTION STEEL STRUCTURE 40ULA
37d
01-Jul-17 A
06-Aug-17
OC40LAC6B15
ERECTION FEEDWATER PUMPS LAC
28d
17-Aug-17
13-Sep-17
463d
08-Jun-16 A
13-Sep-17
463d
08-Jun-16 A
Block 3 UNIT 30
TRANSPORT PCC 12UBA1110 TO SITE
DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 40LAC SUMMARY CONSTRUCTION FOUNDATION 40ULA TRANSPORT FEEDWATER PUMP 40LAC NSP-SITE ERECTION STEEL STRUCTURE 40ULA ERECTION FEEDWATER PUMPS LAC
13-Sep-17
SI30LAC3B25
DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 30LAC 343d 08-Jun-16 A
16-Mai-17 A
SI30LAC4B25
TRANSPORT FEEDWATER PUMP 30LAC NSP-SITE
34d
17-Mai-17 A
19-Jun-17 A
TRANSPORT FEEDWATER PUMP 30LAC NSP-SITE
OC30ULA5-15#
SUMMARY CONSTRUCTION FOUNDATION 30ULA
35d
27-Mai-17 A
30-Jun-17 A
SUMMARY CONSTRUCTION FOUNDATION 30ULA
OC30ULA5B15
ERECTION STEEL STRUCTURE 30ULA
26d
12-Jul-17 A
06-Aug-17
OC30LAC6B15
ERECTION FEEDWATER PUMPS LAC
28d
17-Aug-17
13-Sep-17
494d
09-Apr-16 A
15-Aug-17
494d
09-Apr-16 A
Block 2 UNIT 20
DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 20LAC 315d 09-Apr-16 A
18-Feb-17 A
SI20LAC4B25
TRANSPORT FEEDWATER PUMP 20LAC NSP-SITE
31d
19-Feb-17 A
22-Mrz-17 A
OC20ULA5-15#
SUMMARY CONSTRUCTION FOUNDATION 20ULA
14d
10-Mai-17 A
24-Mai-17 A
OC20ULA5B15
ERECTION STEEL STRUCTURE 20ULA
80d
28-Mai-17 A
15-Aug-17
OC20LAC6B15
ERECTION FEEDWATER PUMPS LAC
30d
12-Jun-17 A
12-Jul-17 A
547d
11-Feb-16 A
10-Aug-17
547d
11-Feb-16 A
DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 10LAC 343d 11-Feb-16 A
18-Jan-17 A
OC10ULA5-15#
SUMMARY CONSTRUCTION FOUNDATION 10ULA
22d
12-Jan-17 A
02-Feb-17 A
SI10LAC4B25
TRANSPORT FEEDWATER PUMP 10LAC NSP-SITE
26d
19-Jan-17 A
13-Feb-17 A
OC10ULA5B15
ERECTION STEEL STRUCTURE 10ULA
90d
13-Mai-17 A
10-Aug-17
OC10LAC6B15
ERECTION FEEDWATER PUMPS LAC
26d
17-Mai-17 A
11-Jun-17 A
246d
27-Sep-16 A
31-Mai-17 A
44d
27-Sep-16 A
09-Nov-16 A
Block 4 UNIT 42 OC42UHY5-15#
44d
27-Sep-16 A
09-Nov-16 A
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 42UHY 44d
27-Sep-16 A
09-Nov-16 A
22d
18-Okt-16 A
08-Nov-16 A
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 41UHY 22d
18-Okt-16 A
08-Nov-16 A
37d
09-Okt-16 A
15-Nov-16 A
UNIT 41 OC41UHY5-15#
Block 3 UNIT 32 OC32UHY5-15#
37d
09-Okt-16 A
15-Nov-16 A
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 32UHY 37d
09-Okt-16 A
15-Nov-16 A
37d
09-Okt-16 A
15-Nov-16 A
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 31UHY 37d
09-Okt-16 A
15-Nov-16 A
206d
06-Nov-16 A
31-Mai-17 A
UNIT 31 OC31UHY5-15#
Block 2 UNIT 22 OC22UHY5-15#
206d
06-Nov-16 A
31-Mai-17 A
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 22UHY206d
06-Nov-16 A
31-Mai-17 A
131d
13-Nov-16 A
24-Mrz-17 A
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 21UHY131d
13-Nov-16 A
24-Mrz-17 A
90d
19-Okt-16 A
17-Jan-17 A
UNIT 21 OC21UHY5-15#
Block 1 UNIT 11 OC11UHY5-15#
36d
12-Dez-16 A
17-Jan-17 A
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 11UHY 36d
12-Dez-16 A
17-Jan-17 A
19d
19-Okt-16 A
07-Nov-16 A
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 12UHY 19d
19-Okt-16 A
07-Nov-16 A
487d
27-Feb-16 A
27-Jun-17 A
191d
26-Mrz-16 A
02-Okt-16 A
70d
26-Mrz-16 A
04-Jun-16 A
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 40/41/42UEY 70d 26-Mrz-16 A
04-Jun-16 A
UNIT 12 OC12UHY5-15#
Concrete / Formwork / Reinforcement UEY Block 4 UNIT 42 OC42UEY5-15#
121d
04-Jun-16 A
02-Okt-16 A
121d
04-Jun-16 A
02-Okt-16 A
366d
09-Mai-16 A
10-Mai-17 A
89d
09-Mai-16 A
06-Aug-16 A
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 30/31/32UEY 89d 09-Mai-16 A
06-Aug-16 A
UNIT 41 OC41UEY5B15
ERECTION STEEL STRUCTURE PIPE BRIDGE 41UEY
Block 3 UNIT 32 OC32UEY5-15#
318d
26-Jun-16 A
10-Mai-17 A
318d
26-Jun-16 A
10-Mai-17 A
415d
27-Feb-16 A
17-Apr-17 A
269d
27-Feb-16 A
22-Nov-16 A
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 20/21/22UEY 269d 27-Feb-16 A
22-Nov-16 A
UNIT 31 OC31UEY5B15
Block 2 UNIT 22 OC22UEY5-15#
UNIT 21
ERECTION STEEL STRUCTURE PIPE BRIDGE 31UEY
128d
10-Dez-16 A
ERECTION FEEDWATER PUMPS LAC
DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 20LAC TRANSPORT FEEDWATER PUMP 20LAC NSP-SITE SUMMARY CONSTRUCTION FOUNDATION 20ULA ERECTION STEEL STRUCTURE 20ULA ERECTION FEEDWATER PUMPS LAC
10-Aug-17
SI10LAC3B25
Pipe Bridge UHY
ERECTION STEEL STRUCTURE 30ULA
15-Aug-17
SI20LAC3B25
Block 1 UNIT 10
DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 30LAC
17-Apr-17 A
DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 10LAC SUMMARY CONSTRUCTION FOUNDATION 10ULA TRANSPORT FEEDWATER PUMP 10LAC NSP-SITE ERECTION STEEL STRUCTURE 10ULA ERECTION FEEDWATER PUMPS LAC
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 42UHY
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 41UHY
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 32UHY
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 31UHY
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 22UHY
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 21UHY
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 11UHY
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 12UHY
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 40/41/42UEY
ERECTION STEEL STRUCTURE PIPE BRIDGE 41UEY
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 30/31/32UEY
ERECTION STEEL STRUCTURE PIPE BRIDGE 31UEY
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 20/21/22UEY
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
OC21UEY5B15
Activity Name
Dur.
Start
ERECTION STEEL STRUCTURE PIPE BRIDGE 21UEY
128d
10-Dez-16 A
17-Apr-17 A
270d
01-Okt-16 A
27-Jun-17 A
147d
01-Feb-17 A
27-Jun-17 A
147d
01-Feb-17 A
27-Jun-17 A
40d
01-Okt-16 A
09-Nov-16 A
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 10/11/12UEY 40d 01-Okt-16 A
09-Nov-16 A
Block 1 UNIT 11 OC11UEY5B15
Layout Name : EG1019_Level2
ERECTION STEEL STRUCTURE PIPE BRIDGE 11UEY
UNIT 12 OC12UEY5-15#
Finish
589d
24-Jun-16 A
02-Feb-18
589d
24-Jun-16 A
02-Feb-18
589d
24-Jun-16 A
02-Feb-18
589d
24-Jun-16 A
02-Feb-18
OC-----6A15#
SUMMARY ERECTION / INSULATION WATER STEAM CYCLE (G-/P-/L SY 589d STEMS) 24-Jun-16 A
OC--L--6A15#
SUMMARY ERECTION WATER S TEAM CYCLE (L SYSTEMS)
SYSTEMS / PIPING / COMMISSIONING Piping Erection General GENERAL
Block 4 UNIT 42 OC42---6A15#
SUMMARY ERECTION WATER S TEAM CYCLE 42 (P-/L SYSTEMS)
UNIT 40 OC40---6H15#
SUMMARY ERECTION WATER S TEAM CYCLE 40 (P-/L SYSTEMS)
Block 3 UNIT 32 OC32---6A15#
SUMMARY ERECTION WATER S TEAM CYCLE 32 (P-/L SYSTEMS)
UNIT 30 OC30---6H15#
SUMMARY ERECTION WATER S TEAM CYCLE 30 (P-/L SYSTEMS)
Block 2 UNIT 22 OC22---6A15#
SUMMARY ERECTION WATER S TEAM CYCLE 22 (P-/L SYSTEMS)
UNIT 20 OC20---6H15#
SUMMARY ERECTION WATER S TEAM CYCLE 20 (P-/L SYSTEMS)
Block 1 UNIT 12 OC12---6A15#
SUMMARY ERECTION WATER S TEAM CYCLE 12 (P-/L SYSTEMS)
UNIT 10 OC10---6H15#
SUMMARY ERECTION WATER S TEAM CYCLE 10 (P-/L SYSTEMS)
CIRCULATING WATER AREA Piling Circulating Cooling Water Area
SUMMARY ERECTION / INSULATION WATER STEAM CYCLE (G-/P-/L SY STEMS)
02-Feb-18
SUMMARY ERECTION WATER S TEAM CYCLE (L SYSTEMS)
589d
24-Jun-16 A
02-Feb-18
479d
12-Okt-16 A
02-Feb-18
479d
12-Okt-16 A
02-Feb-18
560d
24-Jun-16 A
04-Jan-18
560d
24-Jun-16 A
04-Jan-18
516d
20-Jul-16 A
17-Dez-17
427d
12-Okt-16 A
12-Dez-17
427d
12-Okt-16 A
12-Dez-17
516d
20-Jul-16 A
17-Dez-17
516d
20-Jul-16 A
17-Dez-17
406d
21-Okt-16 A
30-Nov-17
253d
21-Mrz-17 A
28-Nov-17
253d
21-Mrz-17 A
28-Nov-17
406d
21-Okt-16 A
30-Nov-17
406d
21-Okt-16 A
30-Nov-17
418d
11-Okt-16 A
02-Dez-17
209d
19-Mrz-17 A
13-Okt-17
209d
19-Mrz-17 A
13-Okt-17
418d
11-Okt-16 A
02-Dez-17
418d
11-Okt-16 A
02-Dez-17
1082d
29-Sep-15 A
14-Sep-18
109d
01-Apr-16 A
19-Jul-16 A
64d
16-Mai-16 A
19-Jul-16 A
64d
16-Mai-16 A
19-Jul-16 A
64d
16-Mai-16 A
19-Jul-16 A
OC40URD5-00
PILING URD + TESTING
27d
13-Jun-16 A
10-Jul-16 A
46d
15-Mai-16 A
30-Jun-16 A
46d
15-Mai-16 A
30-Jun-16 A
41d
15-Mai-16 A
25-Jun-16 A
8d
22-Jun-16 A
30-Jun-16 A
75d
01-Apr-16 A
15-Jun-16 A
75d
01-Apr-16 A
15-Jun-16 A
Block 3 UNIT 30 PILING URD + TESTING
Block 2 UNIT 20 OC20URA5-00
PILING URA/URL + TESTING
54d
01-Apr-16 A
25-Mai-16 A
OC20URD5-00
PILING URD + TESTING
20d
26-Mai-16 A
15-Jun-16 A
18d
31-Mai-16 A
18-Jun-16 A
18d
31-Mai-16 A
18-Jun-16 A
18d
31-Mai-16 A
18-Jun-16 A
934d
04-Okt-15 A
24-Apr-18
934d
04-Okt-15 A
24-Apr-18
934d
04-Okt-15 A
24-Apr-18
Block 1 UNIT 10 OC10URD5-00
PILING URD + TESTING
STRUCTURE FOR CIRCULATING WATER INLET CULVERT General COMMON
SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 10/11/12UEY
02-Feb-18
PILING URA/URL + TESTING
OC30URD5-00
ERECTION STEEL STRUCTURE PIPE BRIDGE 11UEY
12-Okt-16 A
OC40URA5-00
PILING URA/URL + TESTING
ERECTION STEEL STRUCTURE PIPE BRIDGE 21UEY
479d
Block 4 UNIT 40
OC30URA5-00
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 21 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
SUMMARY ERECTION WATER S TEAM CYCLE 42 (P-/L SYSTEMS)
SUMMARY ERECTION WATER STEAM CYCLE 40 (P-/L SYSTEMS)
SUMMARY ERECTION WATER S TEAM CYCLE 32 (P-/L SYSTEMS) SUMMARY ERECTION WATER STEAM CYCLE 30 (P-/L SYSTEMS)
SUMMARY ERECTION WATER S TEAM CYCLE 22 (P-/L SYSTEMS) SUMMARY ERECTION WATER S TEAM CYCLE 20 (P-/L SYSTEMS)
SUMMARY ERECTION WATER S TEAM CYCLE 12 (P-/L SYSTEMS) SUMMARY ERECTION WATER S TEAM CYCLE 10 (P-/L SYSTEMS)
PILING URA/URL + TESTING PILING URD + TESTING
PILING URA/URL + TESTING PILING URD + TESTING
PILING URA/URL + TESTING PILING URD + TESTING
PILING URD + TESTING
OC00UPC2-76
PREPARATION BASIC BUILDING DWGS
34d
04-Okt-15 A
07-Nov-15 A
OC00UPC2-79
DETAIL DESIGN, CHECKER CONCRETE STRUCTURE
83d
08-Nov-15 A
30-Jan-16 A
OC00UQB2-61
START NUMERIC MODELLING
OC00UQB2-45
PREPARATION BASIC BUILDING DWGS UQB/UPN
OC00UQB2-62
PREPARTION OF NUMERIC MODELLING STUDY
OC00UQB2A70
DETAIL DESIGN, CHECKER CONCRETE STRUCTURE UQB/UPN
OC00UPN2-83 OC00UPN2-81
DETAIL DESIGN DRAW INGS - ONSHORE
15d
26-Mrz-16 A
10-Apr-16 A
OC00UPN2-79
PRELIMINARY STUDIES UP B
29d
01-Jun-16 A
30-Jun-16 A
OC00UPN2-80
PRE-ENGINEERING SURVEY UPB
30d
15-Jun-16 A
15-Jul-16 A
OC00UPB2-85
SUMMARY ENGINEERING INLET PIPES LINE - OFFSHORE - TIDEWAY461d
04-Aug-16 A
07-Nov-17
OC00UPC5-61
VELOCITY CAP DESIGN ( INCLUDE FOUNDATION)
365d
06-Okt-16 A
05-Okt-17
OC00UPN5-51
SUMMARY INS TALAION OF ONSHORE PIPE LINES
327d
09-Okt-16 A
31-Aug-17
OC00UPN5-62
RENT QUAY WALL AND STORAGE AREA AT IDKU
435d
09-Okt-16 A
17-Dez-17
OC00UPN2-41
ASSIGNING SUB-CONTRACTOR
0d
09-Okt-16 A
OC00UPN5-66
PROC, MANUFA CTURING & DELIVERY HDPE PIPES + ACCESSORIES121d
27-Okt-16 A
24-Feb-17 A
OC00UQB5E15#
CIVIL W ORKS COOLING STRUCTURE UQ B/UPN (PUMP AREA)
25-Nov-16 A
13-Sep-17
OC00UPB2-87
SUMMARY ENGINEERING INLET PIPES LINE - OFFSHORE - PIPELIFE
25-Nov-16 A
25-Nov-16 A
SUMMARY ENGINEERING IN LET PIPES LINE - OFFSHORE - PIPELIFE
OC00UPB2-86
SUMMARY FABRICATIO N & PROCURME NT INLET PIPES LINE - OFFSHORE 0d - PIPELIFE 25-Nov-16 A
25-Nov-16 A
SUMMARY FABRICATIO N & PROCURME NT INLET PIPES LINE - OFFSHORE - PIPELIFE
OC00UPN5-71
PROC, MANUFA CTURING & DELIVERY SHEET PILES
86d
30-Nov-16 A
23-Feb-17 A
PROC, MANUFA CTURING & DELIVERY SHEET PILES
OC00UPN5-72
PROC, MANUFA CTURING & DELIVERY CAUSEWAY MATERIAL
86d
30-Nov-16 A
23-Feb-17 A
PROC, MANUFA CTURING & DELIVERY CAUSEWAY MATERIAL
OC00UPN5-67
PROC, MANUFA CTURING & DELIVERY CONCRETE COLLAR
153d
01-Dez-16 A
02-Mai-17 A
0d
07-Feb-16 A
227d
07-Feb-16 A
21-Sep-16 A
72d
07-Feb-16 A
19-Apr-16 A
248d
07-Feb-16 A
11-Okt-16 A
SUMMARY FABRICATIO N & PROCURME NT INLET PIPES LINE - OFFSHORE 524d - TIDEWAY 26-Mrz-16 A
31-Aug-17
293d 0d
PREPARATION BASIC BUILDING DWGS DETAIL DESIGN, CHECKER CONCRETE STRUCTURE START NUMERIC MODELLING PREPARATION BASIC BUILDING DWGS UQB/UPN PREPARTION OF NUMERIC MODELLING STUDY DETAIL DESIGN, CHECKER CONCRETE STRUCTURE UQB/UPN SUMMARY FABRICATIO N & PROCURME NT INLET PIPES LINE - OFFSHORE - TIDEWAY DETAIL DESIGN DRAW INGS - ONSHORE PRELIMINARY STUDIES UP B PRE-ENGINEERING SURVEY UPB SUMMARY ENGINEERING IN LET PIPES LINE - OFFSHORE - TIDEWAY VELOCITY CAP DESIGN ( INCLUDE FOUNDATION) SUMMARY INS TALAION OF ONSHORE PIPE LINES RENT QUAY WALL AND STORAGE AREA AT IDKU ASSIGNING SUB-CONTRACTOR PROC, MANUFA CTURING & DELIVERY HDPE PIPES + ACCESSORIES CIVIL W ORKS COOLING STRUCTURE UQ B/UPN (PUMP AREA)
PROC, MANUFA CTURING & DELIVERY CONCRETE COLLAR
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
Layout Name : EG1019_Level2 Dur.
Start
Finish
25-Dez-16 A
04-Jan-17 A
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 22 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 CIVIL W ORKS COOLING STRUCTURE UQ B/UPN (REMAINING AREA)
OC00UQB5E15#2
CIVIL W ORKS COOLING STRUCTURE UQ B/UPN (REMAINING AREA) 11d
OC00UPN5-68
PROC, MANUFA CTURING & DELIVERY MANHOLE + SPOOL PIECE + CHLORINATION 87d 25-Dez-16 PIPE A MATERIA 21-Mrz-17 LS A
OC00UQR5-94
INSTALLING SCOUR PROTECTION AT OUTFALL PIPELINE EXIT
13d
10-Feb-17 A
23-Feb-17 A
OC00UQR5-93
DRIDGING WORKS AT OUTFALL PIPELINE DISCHARGE
19d
24-Feb-17 A
15-Mrz-17 A
OC00UPN2-43
MINE SCAN (BY ARMY)
70d
04-Mrz-17 A
12-Mai-17 A
OC00UPN2-88
INSTALLATION DESIGN
247d
06-Mrz-17 A
07-Nov-17
OC00UPN5-56
HDPE PIPES & CONCRETE COLLARS INSTALLATION AT HARBO UR 139d
06-Mrz-17 A
22-Jul-17 A
OC00UPN5-64
MOBILIZATION OF ONSHORE EQUIPMENT
14d
01-Apr-17 A
15-Apr-17 A
OC00UPN5-81
COFFERDAM INSTALLATION (SHEET PILES & CAUSEWAY)
97d
12-Apr-17 A
18-Jul-17 A
OC00UPC5-52
PROC, MANUFA CTURING & DELIVERY INTAK E STRUCTURES (V ELOCITY 83dCAP) 10-Mai-17 A
31-Jul-17
OC00UPN2-89
SOIL INVESTIGATION WORKS A ND RE PORT
90d
13-Mai-17 A
10-Aug-17
OC00UPN5-57
MANHOLES INSTALLATION AT HARBOUR
32d
15-Jul-17 A
15-Aug-17
OC00UPN5-73
PROC. & DELIVERY SCOUR P ROTECTION MATERIAL ( VELO CITY CAP & 42d DISCHARGE) 21-Jul-17 A
31-Aug-17
PROC. & DELIVERY SCOUR P ROTECTION MATERIAL ( VELO CITY CAP & DISCHARGE)
OC00UPN5-70
PROC. & DELIVERY ENGINEE RED BACKFILL MATERIAL
21-Jul-17 A
31-Aug-17
PROC. & DELIVERY ENGINEE RED BACKFILL MATERIAL
OC00UPN5-74
PROC. & DELIVERY ROCKS FO R FOUNDATION (VELOCITY CAP & DISCHA 42dRGE) 21-Jul-17 A
31-Aug-17
OC00UPN5-59
CHLORINATION PIPELINES INSTALLATION
15d
05-Aug-17*
19-Aug-17
OC00UPN5-53
MOBILIZATION OF MARINE EQUIPMENT
20d
19-Okt-17
07-Nov-17
OC00UPN5-82
DREDGING INTAKE PIPLINES TRENCH
15d
08-Nov-17
22-Nov-17
OC00UPN5-101
DREDGING INTAKE STRUCTURE FOUNDATION
7d
23-Nov-17
29-Nov-17
DREDGING INTAKE STRUCTURE FOUNDATION
OC00UPC5-48
INTAKE STRUCTURE (VELOCITY CAP) FOUNDATIONS INSTALLATION 1ST 5dPIPELINE 23-Nov-17
27-Nov-17
INTAKE STRUCTURE (VELOCITY CAP) FOUNDATIONS INSTALLATION 1ST PIPELINE
OC00UPC5-62
INTAKE STRUCTURE (VELOCITY CAP) FOUNDATIONS INSTALLATION 2ND 5d PIPELINE 28-Nov-17
02-Dez-17
OC00UPN5-58
HDPE ASSEMBLY TO FULL STRINGS AT HARBOUR
OC00UPN5-102
INTAKE STRUCTURE FOUNDATION GRAVEL DUMPING
42d
PROC, MANUFACTURING & DELIVERY MANHOLE + SPOOL PIECE + CHLORINATION PIPE MATERIALS INSTALLING SCOUR PROTECTION AT OUTFALL PIPELINE EXIT DRIDGING WORKS AT OUTFALL PIPELINE DISCHARGE MINE SCAN (BY ARMY) INSTALLATION DESIGN HDPE PIPES & CONCRETE COLLARS INSTALLATION AT HARBO UR MOBILIZATION OF ONSHORE EQUIPMENT COFFERDAM INSTALLATION (SHEET PILES & CAUSEWAY) PROC, MANUFA CTURING & DELIVERY INTAK E STRUCTURES (V ELOCITY CAP) SOIL INVESTIGATION WORKS A ND RE PORT MANHOLES INSTALLATION AT HARBOUR
PROC. & DELIVERY ROCKS FO R FOUNDATION (VELOCITY CAP & DISCHA RGE) CHLORINATION PIPELINES INSTALLATION MOBILIZATION OF MARINE EQUIPMENT DREDGING INTAKE PIPLINES TRENCH
INTAKE STRUCTURE (VELOCITY CAP) FOUNDATIONS INSTALLATION 2ND PIPELINE HDPE ASSEMBLY TO FULL STRINGS AT HARBOUR
15d
29-Nov-17
13-Dez-17
7d
30-Nov-17
06-Dez-17
INTAKE STRUCTURE FOUNDATION GRAVEL DUMPING
OC00UPC5-50
INTAKE STRUCTURE INSTALLATION (VELOCITY CAP LOWER 2 PIECES)2d 1ST PIPELINE 03-Dez-17
04-Dez-17
INTAKE STRUCTURE INSTALLATION (VELOCITY CAP LOWER 2 PIECES) 1ST PIPELINE
OC00UPC5-63
INTAKE STRUCTURE INSTALLATION (VELOCITY CAP LOWER 2 PIECES)2d 2ND PIPELINE 05-Dez-17
06-Dez-17
INTAKE STRUCTURE INSTALLATION (VELOCITY CAP LOWER 2 PIECES) 2ND PIPELINE
OC00UPN5-103
INTAKE STRUCTURE FOUNDATIONS LEVELLING
7d
07-Dez-17
13-Dez-17
INTAKE STRUCTURE FOUNDATIONS LEVELLING
OC00UPN5-87
1ST INTAKE PIPELINE INSTA LLATION
4d
14-Dez-17
17-Dez-17
1ST INTAKE PIPELINE INSTA LLATION
OC00UPC5-51
INTAKE STRUCTURE INSTALLATION (VELOCITY CAP UPPER 2 PIECES)2d 1ST PIPE 18-Dez-17 LINE
19-Dez-17
INTAKE STRUCTURE INSTALLATION (VELOCITY CAP UPPER 2 PIECES) 1ST PIPE LINE
OC00UPN5-88
2ND INTAKE PIPELINE INSTALLATION
4d
18-Dez-17
21-Dez-17
2ND INTAKE PIPELINE INSTALLATION
OC00UPN5-89
1ST PIPELINE SPOOL PIECE INSTALLATION
4d
18-Dez-17
21-Dez-17
1ST PIPELINE SPOOL PIECE INSTALLATION
OC00UPN5-90
2ND PIPELINE SPOOL PIECE INSTALLATION
4d
22-Dez-17
25-Dez-17
OC00UPN5-91
TEST 1ST INTAKE PIPELINE
5d
22-Dez-17
26-Dez-17
TEST 1ST INTAKE PIPELINE
OC00UPC5-64
INTAKE STRUCTURE INSTALLATION (VELOCITY CAP UPPER 2 PIECES)2d 2ND PIPELINE 22-Dez-17
23-Dez-17
INTAKE STRUCTURE INSTALLATION (VELOCITY CAP UPPER 2 PIECES) 2ND PIPELINE
OC00UPN5-92
TEST 2ND INTAKE PIPELINE
5d
26-Dez-17
30-Dez-17
OC00UPN5-83
BACKFILLING OF INTAKE TRENCH
25d
31-Dez-17
24-Jan-18
BACKFILLING OF INTAKE TRENCH
OC00UPC5-46
SCOUR PROTECTION & ROCKS FRO VELOCITY CAP)
10d
15-Jan-18
24-Jan-18
SCOUR PROTECTION & ROCKS FRO VELOCITY CAP)
OC00UPN5-96
WATER IN PUMP HOUSE FOR LINE 1
0d
24-Jan-18
WATER IN PUMP HOUSE FOR LINE 1
OC00UPN5-97
WATER IN PUMP HOUSE FOR LINE 2
0d
24-Jan-18
WATER IN PUMP HOUSE FOR LINE 2
OC00UPN5-100
DEMOBILIZATION OF MARINE EQUIPMENT
20d
25-Jan-18
13-Feb-18
OC00UPN5-84
COFFERDAM REMOVAL
60d
25-Jan-18
25-Mrz-18
COFFERDAM REMOVAL
OC00UPN5-98
SITE REINSTATMENT
20d
26-Mrz-18
14-Apr-18
SITE REINSTATMENT
OC00UPN5-99
DEMOBILIZAITON OF ONSHORE EQUIPMENT
10d
15-Apr-18
24-Apr-18
210d
19-Dez-15 A
16-Jul-16 A
210d
19-Dez-15 A
16-Jul-16 A
210d
19-Dez-15 A
16-Jul-16 A
11d
19-Dez-15 A
30-Dez-15 A
130d
03-Jan-16 A
12-Mai-16 A
69d
08-Mai-16 A
16-Jul-16 A
299d
15-Aug-16 A
10-Jun-17 A
299d
15-Aug-16 A
10-Jun-17 A
299d
15-Aug-16 A
10-Jun-17 A
STRUCTURE FOR COOLING WATER DISCHARGE UQM General GENERAL OC00UQM2-76
PREPARATION BASIC BUILDING DWGS UQM
OC00UQM2-79
DETAIL DESIGN, CHECKER CONCRETE STRUCTURE UQM
OC00UQM5-52
CONSTRUCTION WORKS UQM
Building for Service Water Outfall S tructure UQR General GENERAL OC00UQR2-81
PREPARATION BASIC BUILDING DWGS
16d
15-Aug-16 A
31-Aug-16 A
OC00UQR2-83
DETAIL DESIGN, CHECKER CONCRETE STRUCTURE
71d
31-Aug-16 A
10-Nov-16 A
OC00UQR5-55
CONCRETE CONSTRUCTION WORKS
51d
20-Apr-17 A
10-Jun-17 A
52d
10-Okt-16 A
30-Nov-16 A
52d
10-Okt-16 A
30-Nov-16 A
52d
10-Okt-16 A
30-Nov-16 A
52d
10-Okt-16 A
30-Nov-16 A
1082d
29-Sep-15 A
14-Sep-18
947d
11-Feb-16 A
14-Sep-18
947d
11-Feb-16 A
14-Sep-18
SI40PAD3-10
DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 40PAD 244d
11-Feb-16 A
11-Okt-16 A
OC40URA5-15#
CIVIL W ORKS COOLING TOWER STRUCTURE URA
328d
04-Aug-16 A
27-Jun-17 A
OC40URA5-10
(H) START PLACING FORMWORK URA
0d
10-Aug-16 A
SI40PAD4-25
TRANSPORT STRUCTURES, FILLS, PIPING ETC. 40PAD INDIA - SITE
45d
12-Okt-16 A
25-Nov-16 A
OC40PAD6-15#
ERECTION FILLS / MECHANICAL EQUIPMENT 40PAD
344d
10-Feb-17 A
19-Jan-18
OC40PAD7F19
ERECTION SCAFFOLDING 40PAD
130d
01-Mrz-17 A
08-Jul-17 A
OC40PAC6B15
ERECTION PAC-PUMPS
42d
12-Aug-17*
22-Sep-17
OC40PAD7F15
E- AND I&C ERE CTION 20PAD
56d
25-Nov-17
19-Jan-18
OC40PAD8-45
FILLING OF COOLING WATER BASIN
7d
08-Sep-18
14-Sep-18
972d
25-Dez-15 A
22-Aug-18
972d
25-Dez-15 A
22-Aug-18
Building for Circulating Cooling Water Pump UQB General COMMON OC00UPN2-44
DESIGN FOR PRE-CAST COLLAR
Wet Cell Cooling Tower PAD Block 4 UNIT 40
Block 3 UNIT 30
2ND PIPELINE SPOOL PIECE INSTALLATION
TEST 2ND INTAKE PIPELINE
DEMOBILIZATION OF MARINE EQUIPMENT
DEMOBILIZAITON OF ONSHORE EQUIPMENT
PREPARATION BASIC BUILDING DWGS UQM DETAIL DESIGN, CHECKER CONCRETE STRUCTURE UQM CONSTRUCTION WORKS UQM
PREPARATION BASIC BUILDING DWGS DETAIL DESIGN, CHECKER CONCRETE STRUCTURE CONCRETE CONSTRUCTION WORKS
DESIGN FOR PRE-CAST COLLAR
DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 40PAD CIVIL W ORKS COOLING TOWER STRUCTURE URA (H) START PLACING FORMWORK URA TRANSPORT STRUCTURES, FILLS, PIPING ETC. 40PAD INDIA - SITE ERECTION FILLS / MECHANICAL EQUIPMENT 40PAD ERECTION SCAFFOLDING 40PAD ERECTION PAC-PUMPS E- AND I&C ERE CTION 20PAD FILLING OF COOLING WATER BASIN
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
Layout Name : EG1019_Level2 Dur.
Start
Finish
25-Aug-16 A
SI30PAD3-10
DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 30PAD 245d
25-Dez-15 A
OC30URA5-10
(H) START PLACING FORMWORK URA
0d
17-Jul-16 A
OC30URA5-15#
CIVIL W ORKS COOLING TOWER STRUCTURE URA
270d
17-Jul-16 A
13-Apr-17 A
SI30PAD4-25
TRANSPORT STRUCTURES, FILLS, PIPING ETC. 30PAD INDIA - SITE
81d
30-Aug-16 A
18-Nov-16 A
OC30PAD6-15#
ERECTION FILLS / MECHANICAL EQUIPMENT 30PAD
337d
12-Jan-17 A
14-Dez-17
OC30PAD7F18
ERECTION SCAFFOLDING 30PAD
123d
14-Jan-17 A
17-Mai-17 A
OC30PAC6B15
ERECTION PAC-PUMPS
42d
10-Aug-17*
20-Sep-17
OC30PAD7F15
E- AND I&C ERE CTION 30PAD
56d
20-Okt-17
14-Dez-17
OC30PAD8-45
FILLING OF COOLING WATER BASIN
7d
16-Aug-18
22-Aug-18
940d
12-Nov-15 A
08-Jun-18
Block 2 UNIT 20
DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 30PAD (H) START PLACING FORMWORK URA
940d
12-Nov-15 A
08-Jun-18
SI20PAD3-10
DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 20PAD 245d
12-Nov-15 A
13-Jul-16 A
OC20URA5-10
(H) START PLACING FORMWORK URA
0d
26-Mai-16 A
OC20URA5-15#
CIVIL W ORKS COOLING TOWER STRUCTURE URA
262d
26-Mai-16 A
12-Feb-17 A
SI20PAD4-25
TRANSPORT STRUCTURES, FILLS, PIPING ETC. 20PAD INDIA - SITE 195d
14-Jul-16 A
24-Jan-17 A
OC20PAD6-15#
ERECTION FILLS / MECHANICAL EQUIPMENT 20PAD
398d
04-Okt-16 A
05-Nov-17
OC20PAD7F17
ERECTION SCAFFOLDING 20PAD
163d
15-Okt-16 A
26-Mrz-17 A
OC20PAC6B15
ERECTION PAC-PUMPS
60d
15-Jun-17 A
13-Aug-17
OC20PAD7F15
E- AND I&C ERE CTION 20PAD
56d
01-Aug-17*
25-Sep-17
OC20PAD8-45
FILLING OF COOLING WATER BASIN
7d
02-Jun-18
08-Jun-18
958d
29-Sep-15 A
13-Mai-18
Block 1 UNIT 10
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 23 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
CIVIL W ORKS COOLING TOWER STRUCTURE URA TRANSPORT STRUCTURES, FILLS, PIPING ETC. 30PAD INDIA - SITE ERECTION FILLS / MECHANICAL EQUIPMENT 30PAD ERECTION SCAFFOLDING 30PAD ERECTION PAC-PUMPS E- AND I&C ERE CTION 30PAD FILLING OF COOLING WATER BASIN
DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 20PAD (H) START PLACING FORMWORK URA CIVIL W ORKS COOLING TOWER STRUCTURE URA TRANSPORT STRUCTURES, FILLS, PIPING ETC. 20PAD INDIA - SITE ERECTION FILLS / MECHANICAL EQUIPMENT 20PAD ERECTION SCAFFOLDING 20PAD ERECTION PAC-PUMPS E- AND I&C ERE CTION 20PAD FILLING OF COOLING WATER BASIN
958d
29-Sep-15 A
13-Mai-18
SI10PAD3-10
DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 10PAD 243d
29-Sep-15 A
28-Mai-16 A
OC10URA5-00
PILING URA + TESTING
59d
02-Mrz-16 A
30-Apr-16 A
OC10URA5-10
(H) START PLACING FORMWORK URA
0d
20-Mai-16 A
OC10URA5-15#
CIVIL W ORKS COOLING TOWER STRUCTURE URA
264d
20-Mai-16 A
07-Feb-17 A
CIVIL W ORKS COOLING TOWER STRUCTURE URA
OC10PAD7F16
ERECTION SCAFFOLDING 10PAD
201d
25-Aug-16 A
13-Mrz-17 A
ERECTION SCAFFOLDING 10PAD
OC10PAD6-15#
SUMMARY ERECTION FILLS / MECHANICA L EQUIPMENT 10PAD
345d
10-Okt-16 A
19-Sep-17
OC10PAC6B15
ERECTION PAC-PUMPS
138d
14-Mrz-17 A
29-Jul-17
OC10PAD7F15
E- AND I&C ERE CTION 10PAD
50d
02-Jul-17 A
20-Aug-17
OC10PAD8-46
TEMPORARY SOURCE AVAILABLE FOR FILLING COOLING WATER BASIN 0d
15-Aug-17*
OC10PAD8-45
FILLING OF COOLING WATER BASIN
07-Mai-18
13-Mai-18 09-Mrz-18
665d
14-Mai-16 A
09-Mrz-18
665d
14-Mai-16 A
09-Mrz-18
SI40PAC3B25
DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC345d
14-Mai-16 A
24-Apr-17 A
SI40PAC4B25
TRANSPORT CIRC. CW PUMP PAC NSP-SITE
28d
25-Apr-17 A
22-Mai-17 A
SI40PAB8-25
COLD COMMISSIONING CIRCULATING WATER SYSTEM 40PAB
49d
20-Jan-18
09-Mrz-18
689d
15-Mrz-16 A
01-Feb-18
Block 3 UNIT 30
689d
15-Mrz-16 A
01-Feb-18
SI30PAC3B25
DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC422d
15-Mrz-16 A
10-Mai-17 A
SI30PAC4B25
TRANSPORT CIRC. CW PUMP PAC NSP-SITE
25d
11-Apr-17 A
06-Mai-17 A
SI30PAB8-25
COLD COMMISSIONING CIRCULATING WATER SYSTEM 30PAB
49d
15-Dez-17
01-Feb-18
707d
15-Jan-16 A
21-Dez-17
Block 2 UNIT 20
707d
15-Jan-16 A
21-Dez-17
SI20PAC3B25
DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC433d
15-Jan-16 A
22-Mrz-17 A
SI20PAC4B25
TRANSPORT CIRC. CW PUMP PAC NSP-SITE
29d
13-Mrz-17 A
10-Apr-17 A
SI20PAB825
COLD COMMISSIONING CIRCULATING WATER SYSTEM 20PAB
49d
03-Nov-17
21-Dez-17
707d
16-Nov-15 A
22-Okt-17
Block 1 UNIT 10
SUMMARY ERECTION FILLS / MECHANICA L EQUIPMENT 10PAD ERECTION PAC-PUMPS E- AND I&C ERE CTION 10PAD TEMPORARY SOURCE AVAILABLE FOR FILLING COOLING WATER BASIN
16-Nov-15 A
Block 4 UNIT 40
7d
PILING URA + TESTING (H) START PLACING FORMWORK URA
845d
Circulating Water Pumps PAC
DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 10PAD
FILLING OF COOLING WATER BASIN
DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC TRANSPORT CIRC. CW PUMP PAC NSP-SITE COLD COMMISSIONING CIRCULATING WATER SYSTEM 40PAB
DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC TRANSPORT CIRC. CW PUMP PAC NSP-SITE COLD COMMISSIONING CIRCULATING WATER SYSTEM 30PAB
DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC TRANSPORT CIRC. CW PUMP PAC NSP-SITE COLD COMMISSIONING CIRCULATING WATER SYSTEM 20PAB
707d
16-Nov-15 A
22-Okt-17
SI10PAC3B25
DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC442d
16-Nov-15 A
30-Jan-17 A
SI10PAC4B25
TRANSPORT CIRC. CW PUMP PAC NSP-SITE
27d
31-Jan-17 A
27-Feb-17 A
SI10PAB88B25
COLD COMMISSIONING CIRCULATING WATER SYSTEM 10PAB
49d
04-Sep-17
22-Okt-17
639d
16-Feb-16 A
15-Nov-17
21d
30-Apr-16 A
21-Mai-16 A
21d
30-Apr-16 A
21-Mai-16 A
21d
30-Apr-16 A
21-Mai-16 A
21d
30-Apr-16 A
21-Mai-16 A
639d
16-Feb-16 A
15-Nov-17
639d
16-Feb-16 A
15-Nov-17
639d
16-Feb-16 A
15-Nov-17
OC00GC-3-25
DESIGN, MANUFACTURING, S HOP TEST DEMINERALIZATION SYSTEM 227d GC
16-Feb-16 A
30-Sep-16 A
OC00UGD5-15#
SUMMARY FOUNDATION INCL. EXCAVATION UGD
65d
24-Mai-16 A
28-Jul-16 A
OC00UGD5D15#
SUMMARY STEEL , CLADDING , FINISHING WORKS STRUCTURE UGD153d
20-Sep-16 A
20-Feb-17 A
OC00GC-6-15
ERECTION INTERCONNECTING PIPING DEMINERALISATION SYSTEM211d GC
27-Okt-16 A
25-Mai-17 A
OC00GC-6-56
ERECTION INTERCONNECTING PIPING SEA WATER PRE TREATMENT 187d SYS TEM 27-Okt-16 GC A
01-Mai-17 A
OC00GC-6-58
ERECTION INTERCONNECTING PIPING DESALINATION SYSTEM GC 74d
05-Jan-17 A
20-Mrz-17 A
OC00GC-6-66
ERECTION INTERCONNECTING PIPING SEWAGE TREATMENT SYS TEM 112d G C 10-Jan-17 A
01-Mai-17 A
OC00GC-6-60
ERECTION INTERCONNECTING PIPING WASTE WATER TREATMENT 197d SYSTE M 26-Jan-17 GC A
10-Aug-17
ERECTION INTERCONNECTING PIPING WASTE WATER TREATMENT SYSTE M G C
OC00GC-6-62
ERECTION INTERCONNECTING PIPING OIL WATER SEPARATION SYSTEM 197d GC 26-Jan-17 A
10-Aug-17
ERECTION INTERCONNECTING PIPING OIL WATER SEPARATION SYSTEM GC
OC00GC-6-64
ERECTION INTERCONNECTING PIPING POTABLE WATER TREATMENT 185d SYSTEM 07-Feb-17 GC A
10-Aug-17
OC00GC-8-56
DEMIN. WATER AVAILABLE TEMPERORY (FOR PRESSURE TES T)
01-Jul-17 A
OC00GC-8-25#
COLD COMMISSIONING DEMINERALIZATION PLANT GC
WATER TREATMENT / WASTE WATER TREATMENT Piling Water Treatment Area General COMMON OC00UGD5-00
PILING UGD + TESTING
Demineralization Plant GCGeneral COMMON
0d 87d
21-Aug-17
15-Nov-17
DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC TRANSPORT CIRC. CW PUMP PAC NSP-SITE COLD COMMISSIONING CIRCULATING WATER SYSTEM 10PAB
PILING UGD + TESTING
DESIGN, MANUFACTURING, S HOP TEST DEMINERALIZATION SYSTEM GC SUMMARY FOUNDATION INCL. EXCAVATION UGD SUMMARY STEEL , CLADDING , FINISHING WORKS STRUCTURE UGD ERECTION INTERCONNECTING PIPING DEMINERALISATION SYSTEM GC ERECTION INTERCONNECTING PIPING SEA WATER PRE TREATMENT SYSTEM GC ERECTION INTERCONNECTING PIPING DESALINATION SYSTEM GC ERECTION INTERCONNECTING PIPING SEWAGE TREATMENT SYSTEM G C
ERECTION INTERCONNECTING PIPING POTABLE WATER TREATMENT SYSTEM GC DEMIN. WATER AVAILABLE TEMPERORY (FOR PRESSURE TEST) COLD COMMISSIONING DEMINERALIZATION PLANT GC
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
OC00GC-8-50
Activity Name
DEMIN. WATER AVAILABLE (FOR PRESSURE TEST)
Compressor Air Station SCA General COMMON
Layout Name : EG1019_Level2 Dur.
Start
Finish
255d
19-Aug-16 A
30-Apr-17 A
255d
19-Aug-16 A
30-Apr-17 A
255d
19-Aug-16 A
30-Apr-17 A
6d
19-Aug-16 A
25-Aug-16 A
0d
25-Sep-17
OC00USC5-4
PILING WORKS AIR COMPRES SOR BUILDING 00USC
OC00USC5-1
FOUNDATION FOR AIR COMPRESSOR BUILDING 00USC
20d
22-Sep-16 A
11-Okt-16 A
OC00USC5-2
CIVIL W ORK FOR AIR COMPRESSOR BUILDING 00USC
47d
24-Sep-16 A
09-Nov-16 A
OC00SCB5-3
ARCH & E/M WORKS 00USC
142d
10-Dez-16 A
30-Apr-17 A
815d
18-Jun-15 A
09-Sep-17
815d
18-Jun-15 A
09-Sep-17
163d
12-Jul-16 A
21-Dez-16 A
163d
12-Jul-16 A
21-Dez-16 A
0d
12-Jul-16 A
41d
15-Jul-16 A
FUEL GAS SUPPLY AREA Fuel Gas Compressor Station EKH General COMMON
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 24 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 DEMIN. WATER AVAILABLE (FOR PRESSURE TEST)
PILING WORKS AIR COMPRESSOR BUILDING 00USC FOUNDATION FOR AIR COMPRESSOR BUILDING 00USC CIVIL W ORK FOR AIR COMPRESSOR BUILDING 00USC ARCH & E/M WORKS 00USC
OC00UEN5-10
(H) START PLACING FORMWORK 00UEN04
OC00UEN5-15
CONSTRUCTION FOUNDATION 00UEN04
OC00EKH6-17
ERECTION PIPES / VALVES WORKS FOR COMPRESSOR STATIO N EKG 127dALL17-Aug-16 UNITS (ZONE2) A 21-Dez-16 A
OC00EK-6-15
ERECTION GAS RECEIVING STATION 00EK
OC00EKH6-16
ERECTION COMPRESSOR STATION 00EKH FOR COMPRESSOR, AUXILARIES 99d 09-Sep-16 AND HEATER A 16-Dez-16 A
ERECTION COMPRESSOR STATION 00EKH FOR COMPRESSOR, AUXILARIES AND HEATER
OC00EKH6-19
ERECTION COMPRESSOR STATION 00EKH FOR ENCLOSURE
ERECTION COMPRESSOR STATION 00EKH FOR ENCLOSURE
Block 4 UNIT 4-
82d
25-Aug-16 A
(H) START PLACING FORMWORK 00UEN04 25-Aug-16 A
CONSTRUCTION FOUNDATION 00UEN04 ERECTION PIPES / VALVES WORKS FOR COMPRESSOR STATIO N EKG ALL UNITS (ZONE2)
15-Nov-16 A
65d
16-Okt-16 A
19-Dez-16 A
556d
18-Jun-15 A
25-Dez-16 A 25-Dez-16 A
ERECTION GAS RECEIVING STATION 00EK
556d
18-Jun-15 A
SI4-EKH3-81
DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 40EKH 313d
18-Jun-15 A
25-Apr-16 A
SI4-EKH4-41
TRANSPORT COMPRESSO R S TATION 40EKH NSP - SITE
106d
26-Apr-16 A
09-Aug-16 A
OC4-EKH6-43
ERECTION FILTER/E-HEATER40
110d
29-Aug-16 A
16-Dez-16 A
OC4-EKH6-16
ERECTION COMPRESSOR STATION 40EKH
101d
29-Aug-16 A
07-Dez-16 A
ERECTION COMPRESSOR STATION 40EKH
OC4-EKH7-15
ELECTRICAL ERECTION COMPRESSO R S TATION 40EKH
36d
01-Nov-16 A
07-Dez-16 A
ELECTRICAL ERECTION COMPRESSO R S TATION 40EKH
SI4-EKH8-25
COLD COMMISSIONING GAS COMPRESSOR STATION 40EKH/00EKH 16d
09-Dez-16 A
24-Dez-16 A
SI4-EKH8-26
GAS COMPRESSOR BYPASS READY FOR GAS ADMISSION - 1ST IGNITIO 0dN 42 /41 (COMP RESSO 25-Dez-16 R BY PASS) A
DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 40EKH TRANSPORT COMPRESSO R S TATION 40EKH NSP - SITE ERECTION FILTER/E-HEATER40
COLD COMMISSIONING GAS COMPRESSOR STATION 40EKH/00EKH GAS COMPRESSOR BYPASS READY FOR GAS ADMISSION - 1ST IGNITIO N 42/41 (COMP RESSO R BY PASS)
611d
18-Jun-15 A
17-Feb-17 A
611d
18-Jun-15 A
17-Feb-17 A
SI3-EKH3-81
DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 30EKH 349d
18-Jun-15 A
31-Mai-16 A
SI3-EKH4-41
TRANSPORT COMPRESSO R S TATION 30EKH NSP - SITE
56d
01-Jun-16 A
27-Jul-16 A
OC3-EKH6-43
ERECTION COMPRESSOR STATION 30EKH
98d
10-Sep-16 A
16-Dez-16 A
ERECTION COMPRESSOR STATION 30EKH
OC3-EKH6-42
ERECTION FILTER/E-HEATER30
91d
17-Sep-16 A
16-Dez-16 A
ERECTION FILTER/E-HEATER30
OC3-EKH7-15
ELECTRICAL ERECTION COMPRESSO R S TATION 30EKH
54d
01-Nov-16 A
24-Dez-16 A
OC3-EKH6-16
ERECTION COMPRESSOR STATION AUXILIARIES (GAS & OIL COOLER 104d ) & ENCLOSURE 06-Nov-16 A30EKH 17-Feb-17 A
SI3-EKH8-25
COLD COMMISSIONING GAS COMPRESSOR STATION 30EKH
SI3-EKH8-26
GAS COMPRESSOR BYPASS READY FOR GAS ADMISSION - 1ST IGNITIO 0dN 32 /31 (COMP RESSO 19-Jan-17 R BY PASS) A
Block 3 UNIT 3-
14d
09-Dez-16 A
18-Jun-15 A
705d
18-Jun-15 A
22-Mai-17 A
SI2-EKH3-81
DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 20EKH 361d
18-Jun-15 A
12-Jun-16 A
SI2-EKH4-41
TRANSPORT COMPRESSO R S TATION 20EKH NSP - SITE
78d
13-Jun-16 A
29-Aug-16 A
OC2-EKH6-43
ERECTION COMPRESSOR STATION 20EKH
75d
13-Sep-16 A
27-Nov-16 A
OC2-EKH7-15
ELECTRICAL ERECTION COMPRESSO R S TATION 20EKH
185d
12-Okt-16 A
15-Apr-17 A
OC2-EKH6-16
ERECTION COMPRESSOR STATION AUXILIARIES (GAS & OIL COOLER 190d ) & ENCLOSURE 06-Nov-16 A20EKH 14-Mai-17 A
OC2-EKH6-42
ERECTION FILTER/E-HEATER20
SI2-EKH8-25
COLD COMMISSIONING GAS COMPRESSOR STATION 20EKH
Block 1 UNIT 1-
6d
TRANSPORT COMPRESSO R STATION 30EKH NSP - SITE
ELECTRICAL ERECTION COMPRESSO R STATION 30EKH ERECTION COMPRESSOR STATION AUXILIARIES (GAS & OIL COOLER ) & ENCLOSURE 30EKH
22-Dez-16 A
705d
Block 2 UNIT 2-
DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 30EKH
COLD COMMISSIONING GAS COMPRESSOR STATION 30EKH GAS COMPRESSOR BYPASS READY FOR GAS ADMISSION - 1ST IGNITIO N 32 /31 (COMP RESSO R BY PASS)
22-Mai-17 A
01-Dez-16 A
07-Dez-16 A
9d
14-Mai-17 A
22-Mai-17 A
815d
18-Jun-15 A
09-Sep-17
DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 20EKH TRANSPORT COMPRESSO R S TATION 20EKH NSP - SITE ERECTION COMPRESSOR STATION 20EKH ELECTRICAL ERECTION COMPRESSO R S TATION 20EKH ERECTION COMPRESSOR STATION AUXILIARIES (GAS & OIL COOLER ) & ENCLOSURE 20EKH ERECTION FILTER/E-HEATER20 COLD COMMISSIONING GAS COMPRESSOR STATION 20EKH
815d
18-Jun-15 A
09-Sep-17
SI1-EKH3-81
DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 10EKH 538d
18-Jun-15 A
07-Dez-16 A
SI1-EKH4-41
TRANSPORT COMPRESSO R S TATION 10EKH NSP - SITE
55d
08-Dez-16 A
31-Jan-17 A
OC1-EKH6-43
ERECTION COMPRESSOR STATION 10EKH
121d
14-Feb-17 A
14-Jun-17 A
OC1-EKH6-16
ERECTION COMPRESSOR STATION AUXILIARIES (GAS & OIL COOLER36d ) & ENCLOSURE 14-Feb-17 A10EKH 22-Mrz-17 A
OC1-EKH6-42
ERECTION FILTER/E-HEATER10
17d
01-Mrz-17 A
18-Mrz-17 A
OC1-EKH7-15
ELECTRICAL ERECTION COMPRESSO R S TATION 10EKH
64d
05-Mrz-17 A
07-Mai-17 A
SI1-EKH8-25
COLD COMMISSIONING GAS COMPRESSOR STATION 10EKH
26d
15-Aug-17
09-Sep-17
COLD COMMISSIONING GAS COMPRESSOR STATION 10EKH
IS1-EKH8-25
#INTERFACE# COLD COMMIS SIONING GA S COMPRE SSOR STATION 10EKH 0d
09-Sep-17
#INTERFACE# COLD COMMISSIONING GAS COMPRESSOR STATION 10EKH
CONTROL ROOM BUILDING Concrete / Formwork / Reinforcement UCA General COMMON
946d
16-Nov-15 A
18-Jun-18
370d
16-Nov-15 A
19-Nov-16 A
370d
16-Nov-15 A
19-Nov-16 A
370d
16-Nov-15 A
19-Nov-16 A
17d
16-Nov-15 A
02-Dez-15 A
DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 10EKH TRANSPORT COMPRESSO R S TATION 10EKH NSP - SITE ERECTION COMPRESSOR STATION 10EKH ERECTION COMPRESSOR STATION AUXILIARIES (GAS & OIL COOLER ) & ENCLOSURE 10EKH ERECTION FILTER/E-HEATER10 ELECTRICAL ERECTION COMPRESSO R S TATION 10EKH
OC00UCA5-00
PILING UCA/UYC + TESTING
OC00UCA5-15#
CONSTRUCTION OF CONTROL ROOM UCA/UYC
235d
19-Dez-15 A
10-Aug-16 A
CONSTRUCTION OF CONTROL ROOM UCA/UYC
OC00UCA7-15
ERECTION CONTROL ROOM EQUIPMENT UCA
118d
15-Jul-16 A
10-Nov-16 A
ERECTION CONTROL ROOM EQUIPMENT UCA
SI00CR-8-25
COMMISSIONING CONTROL ROOM EQUIPMENT
7d
13-Nov-16 A
19-Nov-16 A
774d
06-Mai-16 A
18-Jun-18
774d
06-Mai-16 A
18-Jun-18
774d
06-Mai-16 A
18-Jun-18
35d
06-Mai-16 A
10-Jun-16 A
732d
17-Jun-16 A
18-Jun-18
85d
27-Jul-16 A
20-Okt-16 A
85d
27-Jul-16 A
20-Okt-16 A
85d
27-Jul-16 A
20-Okt-16 A
Concrete / Formwork / Reinforcement UST General COMMON OC00UST5-00
PILING UST + TESTING
OC00UST5-15#
CONSTRUCTION BUILDING UST
PCC 00UBA9410 General COMMON
PILING UCA/UYC + TESTING
COMMISSIONING CONTROL ROOM EQUIPMENT
PILING UST + TESTING CONSTRUCTION BUILDING UST
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
Layout Name : EG1019_Level2 Dur.
Start
Finish
OC00UBA5-49
(H) START PLACING FORMWORK 00UBA9410/9510/9710
0d
27-Jul-16 A
OC00UBA5-50
FOUNDATION 00UBA9410/9510/9710 (INCL. UBZ OPENING)
11d
27-Jul-16 A
07-Aug-16 A
OC00UBA7G15
ERECTION PCC 00UBA9410/9510/9710 (INCL. INTERNAL CABLING)
42d
08-Sep-16 A
20-Okt-16 A
396d
07-Okt-15 A
05-Nov-16 A
355d
07-Okt-15 A
25-Sep-16 A
355d
07-Okt-15 A
25-Sep-16 A
355d
07-Okt-15 A
25-Sep-16 A
SWITCHYARD Building for Grid Systems Switchgear UAB General COMMON
(H) START PLACING FORMWORK 00UBA9410/9510/9710
OC00UAB5-001
PILING 00UAB + TESTING
39d
07-Okt-15 A
15-Nov-15 A
OC00UAC5-16
PILING 00UAC + TESTING
46d
12-Okt-15 A
27-Nov-15 A
OC00UAB5-10
CONSTRUCTION WORKS 00UAB
332d
30-Okt-15 A
25-Sep-16 A
OC00UAB5-15
(RFE) BUILDING 00UAB
0d
21-Apr-16 A
349d
23-Nov-15 A
05-Nov-16 A
349d
23-Nov-15 A
05-Nov-16 A
349d
23-Nov-15 A
05-Nov-16 A
349d
23-Nov-15 A
05-Nov-16 A
0d
18-Apr-16 A
223d
14-Jan-16 A
24-Aug-16 A
223d
14-Jan-16 A
24-Aug-16 A
223d
14-Jan-16 A
24-Aug-16 A
STRUCTURE FOR GRID SYSTEMS CONTROL BUILDING UAC General COMMON OC00UAC5-17
SUMMARY CONSTRUCTION WORKS 00UAC
OC00UAC5-18
(RFE) BUILDING 00UAC
Concrete / Formwork / Reinforcement UAH General COMMON
165d
14-Jan-16 A
26-Jun-16 A
OC00UAH5-47
CONSTRUCTION FOUNDATION 00UAH01-09
201d
05-Feb-16 A
24-Aug-16 A
208d
06-Apr-16 A
30-Okt-16 A
208d
06-Apr-16 A
30-Okt-16 A
208d
06-Apr-16 A
30-Okt-16 A
208d
06-Apr-16 A
30-Okt-16 A
514d
28-Okt-17
25-Mrz-19
514d 28-Okt-17 Plant Commissioning Combined Cycle / Performance Test & Reliability Run
25-Mrz-19
SI00ABA6-41#
ERECTION SWITCHGEAR ABA LOT1
PLANT COMMISSIONING Block 4 UNIT 40
171d
06-Okt-18
171d
06-Okt-18
25-Mrz-19
30d
06-Okt-18
04-Nov-18 11-Nov-18
#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT40
SI40M--9-55
BYPASS OPERATION FOR ST 40
7d
05-Nov-18
SI40M--9-60
FIRST STEAM ADMISSION TO ST 40
0d
12-Nov-18
SI40MKA9-35
GENERATOR PROTECTION TEST ST 40
3d
12-Nov-18
SI40MKA9-40
1ST. SYNCHRONIZATION ST 40 (TARGE T POWER TO THE GRID)
0d
SI40---9-65
COMBINED CYCLE POWER PLANT LOAD TESTS
64d
15-Nov-18
17-Jan-19
SI40---9-70
OPTIMIZING CCPP BLOCK 40
30d
18-Jan-19
16-Feb-19
SI40---9-80
PERFORMANCE TEST COMBINED CYCLE POWER PLANT
7d
17-Feb-19
23-Feb-19
SI40---9-90
RELIABILITY RUN COMBINED CYCLE POWER PLANT
30d
24-Feb-19
25-Mrz-19
173d
13-Sep-18
04-Mrz-19
SUMMARY CONSTRUCTION WORKS 00UAC
PILING 00UAH + TESTING CONSTRUCTION FOUNDATION 00UAH01-09
ERECTION SWITCHGEAR ABA LOT1
173d
13-Sep-18
04-Mrz-19
33d
13-Sep-18
15-Okt-18 22-Okt-18
#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT40 BYPASS OPERATION FOR ST 40 FIRST STEAM ADMISSION TO ST 40 GENERATOR PROTECTION TEST ST 40
14-Nov-18
1ST. SYNCHRONIZATION ST 40 (TARGET POWER TO THE GRID)
#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT30
SI30M--9-55
BYPASS OPERATION FOR ST 30
7d
16-Okt-18
SI30M--9-60
FIRST STEAM ADMISSION TO ST 30
0d
23-Okt-18
SI30MKA9-35
GENERATOR PROTECTION TEST ST 30
3d
23-Okt-18
SI30MKA9-40
1ST. SYNCHRONIZATION ST 30 (TA RGET POWER TO THE GRID)
0d
SI30---9-65
COMBINED CYCLE POWER PLANT LOAD TESTS
63d
26-Okt-18
27-Dez-18
SI30---9-70
OPTIMIZING CCPP BLOCK 30
30d
28-Dez-18
26-Jan-19
SI30---9-80
PERFORMANCE TEST COMBINED CYCLE POWER PLANT
7d
27-Jan-19
02-Feb-19
SI30---9-90
RELIABILITY RUN COMBINED CYCLE POWER PLANT
30d
03-Feb-19
04-Mrz-19
185d
30-Jun-18
31-Dez-18
185d
30-Jun-18
31-Dez-18
33d
30-Jun-18
01-Aug-18 08-Aug-18
COMBINED CYCLE POWER PLANT LOAD TESTS OPTIMIZING CCPP BLOCK 40 PERFORMANCE TEST COMBINED CYCLE POWER PLANT RELIABILITY RUN COMBINED CYCLE POWER PLANT
#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT30 BYPASS OPERATION FOR ST 30 FIRST STEAM ADMISSION TO ST 30
25-Okt-18
GENERATOR PROTECTION TEST ST 30
25-Okt-18
1ST. SYNCHRONIZATION ST 30 (TA RGET POWER TO THE GRID)
--20---9-50
#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT20
SI20M--9-55
BYPASS OPERATION FOR ST 20
7d
02-Aug-18
SI20M--9-60
FIRST STEAM ADMISSION TO ST 20
0d
09-Aug-18
SI20MKA9-35
GENERATOR PROTECTION TEST ST 20
3d
09-Aug-18
SI20MKA9-40
1ST. SYNCHRONIZATION ST 20 (TA RGET POWER TO THE GRID)
0d
SI20---9-65
COMBINED CYCLE POWER PLANT LOAD TESTS
75d
12-Aug-18
25-Okt-18
SI20---9-70
OPTIMIZING CCPP BLOCK 20
30d
26-Okt-18
24-Nov-18
SI20---9-80
PERFORMANCE TEST COMBINED CYCLE POWER PLANT
7d
25-Nov-18
01-Dez-18
SI20---9-90
RELIABILITY RUN COMBINED CYCLE POWER PLANT
30d
02-Dez-18
31-Dez-18
405d
28-Okt-17
06-Dez-18
405d
28-Okt-17
06-Dez-18
4d
28-Okt-17
31-Okt-17
30d
01-Nov-17
30-Nov-17
0d
01-Dez-17
Block 1 UNIT 10
CONSTRUCTION WORKS 00UAB
14-Nov-18
--30---9-50
Block 2 UNIT 20
PILING 00UAB + TESTING PILING 00UAC + TESTING
25-Mrz-19
--40---9-50
Block 3 UNIT 30
ERECTION PCC 00UBA9410/9510/9710 (INCL. INTERNAL CABLING)
(RFE) BUILDING 00UAC
PILING 00UAH + TESTING
General COMMON
FOUNDATION 00UBA9410/9510/9710 (INCL. UBZ OPENING)
(RFE) BUILDING 00UAB
OC00UAH5-49
GIS Phase 1
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 25 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78
COMBINED CYCLE POWER PLANT LOAD TESTS OPTIMIZING CCPP BLOCK 30 PERFORMANCE TEST COMBINED CYCLE POWER PLANT RELIABILITY RUN COMBINED CYCLE POWER PLANT
#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT20 BYPASS OPERATION FOR ST 20 FIRST STEAM ADMISSION TO ST 20
11-Aug-18
GENERATOR PROTECTION TEST ST 20
11-Aug-18
1ST. SYNCHRONIZATION ST 20 (TA RGET POWER TO THE GRID)
SI10---9-98
PERFORMANCE TEST GT11 / GT12
SI10---9-85
RELIABILITY RUN OPEN CYCLE POWER PLANT UNIT11/12
SI10---9-97
EARLY FINISH DATE G T11 & GT12
--10---9-50
#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT10
32d
04-Jun-18
05-Jul-18
SI10M--9-55
BYPASS OPERATION FOR ST 10
7d
06-Jul-18
12-Jul-18
SI10M--9-60
FIRST STEAM ADMISSION TO ST 10
0d
13-Jul-18
SI10MKA9-35
GENERATOR PROTECTION TEST ST 10
3d
13-Jul-18
SI10MKA9-40
1ST. SYNCHRONIZATION ST 10 (TA RGET POWER TO THE GRID)
0d
SI10---9-65
COMBINED CYCLE POWER PLANT LOAD TESTS
77d
16-Jul-18
30-Sep-18
SI10---9-70
OPTIMIZING CCPP BLOCK 10
30d
01-Okt-18
30-Okt-18
COMBINED CYCLE POWER PLANT LOAD TESTS OPTIMIZING CCPP BLOCK 20 PERFORMANCE TEST COMBINED CYCLE POWER PLANT RELIABILITY RUN COMBINED CYCLE POWER PLANT
PERFORMANCE TEST GT11 / GT12 RELIABILITY RUN OPEN CYCLE POWER PLANT UNIT11/12 EARLY FINISH DATE G T11 & GT12 #STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT10 BYPASS OPERATION FOR ST 10 FIRST STEAM ADMISSION TO ST 10
15-Jul-18
GENERATOR PROTECTION TEST ST 10
15-Jul-18
1ST. SYNCHRONIZATION ST 10 (TA RGET POWER TO THE GRID) COMBINED CYCLE POWER PLANT LOAD TESTS OPTIMIZING CCPP BLOCK 10
Project Name: EG1019 - Burullus - Rev. 0U Activity ID
Activity Name
SI10---9-80
PERFORMANCE TEST COMBINED CYCLE POWER PLANT
SI10---9-90
RELIABILITY RUN COMBINED CYCLE POWER PLANT (3x10d)
Layout Name : EG1019_Level2 Dur.
Start
Finish
7d
31-Okt-18
06-Nov-18
30d
07-Nov-18
06-Dez-18
Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 26 of 26
2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 PERFORMANCE TEST COMBINED CYCLE POWER PLANT RELIABILITY RUN COMBINED CYCLE POWER PLANT (3x10d)
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
A 2. Correspondence status CON
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Project: EG1019 MPR No.: 23
Correspondence List (Customer to Consortium)
SIEMENS Letter-No.(int.)
Letter-No.(ext.)
Subject
Reply Req. Corr. Date
Target Date
2015_22-OC_EEHC-SAG-E-00001 2015_22-OC_EEHC-SAG-E-00002 2015_22-OC_EEHC-SAG-E-00003
2015_22_EEHC_SAG-OC-E-00001 2015_22_EEHC_SAG-OC-E-00002 2015_22_EEHC_SAG-OC-E-00003
Fwd: El Burullus, Beni Suef and New Capital Combined Cycle Power Plants Projects Burullus Project / Egypt 4800 MW Combined Cycle Power Project Re: Burullus: EEHC Letter ref. (2015_22-OC-EEHC-L-00023)
Yes No Yes
04.09.2015 29.10.2015 05.11.2015
11.09.2015 12.11.2015
Completed Completed Completed
2015_22-OC_EEHC-SAG-E-00023 2015_22-OC_EEHC-SAG-E-00026
2015_22_EEHC_SAG-OC-E-00023 2015_22_EEHC_SAG-OC-E-00026
2015-22-SAG-OC-EEHC-L-00029 LAYOUT CHANGE missed E-mails
Yes Yes
17.11.2015 20.10.2015
24.11.2015 27.10.2015
Completed Completed
2015_22-OC_EEHC-SAG-E-00039
2015_22_EEHC_SAG-OC-L-00039
EG1019 CON 2015_22- EEHC_SAG-OC-L-00039 Document transmittals
Yes
21.11.2015
26.11.2015
Completed
2015_22-OC_EEHC-SAG-E-00040 2015_22-OC_EEHC-SAG-E-00050 2015_22-OC_EEHC-SAG-E-00051
2015_22_EEHC_SAG-OC-L-00040 2015_22_EEHC_SAG-OC-L-00050 2015_22_EEHC_SAG-OC-E-00051
Yes Yes Yes
04.12.2015 09.12.2015 12.12.2015
09.12.2015 16.12.2015 18.12.2015
Completed Completed Completed
2015_22-OC_EEHC-SAG-E-00086 2015_22-OC_EEHC-SAG-E-00117
No Yes
24.02.2016 12.03.2016
18.03.2016
Completed Completed
2015_22-OC_EEHC-SAG-E-00119 2015_22-OC_EEHC-SAG-E-00122 2015_22-OC_EEHC-SAG-E-00123
2015_22_EEHC_SAG-OC-L-00086 2015_22_EEHC_SAG-OC-L-00117 2015_22_SAG-OC_EEHC-L-00124 (Part2) 2015_22_EEHC_SAG-OC-L-00144 2015_22_SAG-OC_EEHC-L-00157
AW: Change of rating from 2000 to 3150 A 2015_22- EEHC_SAG-OC -L-00050 Offer of Fuel Oil System the relocation of GIS for Burulls Project Burullus: EEHC Letter ref. (2015_22-SAG-OC_EEHC-L-00086) – "Electrocution Fatality Burullus" 2015_22- EEHC_SAG-OC -L-00117 Border Guards' Approval
No No No
11.03.2016 19.04.2016 15.05.2016
Completed Completed Completed
2015_22-OC_EEHC-SAG-E-00124 2015_22-OC_EEHC-SAG-E-00126
2015_22_EEHC_SAG-OC-L-00156 2015_22_SAG-OC_EEHC-L-00213
No No
13.05.2016 15.08.2016
Completed Completed
2015_22-OC_EEHC-SAG-E-00128 2015_22-OC_EEHC-SAG-E-00129 2015_22-OC_EEHC-SAG-E-00130 2015_22-OC_EEHC-SAG-E-00131
Yes No No No
15.11.2016 16.11.2016 15.12.2016 24.01.2017
No
23.06.2016
Completed
Resend: 2015_22-SAG-OC_EEHC-L-00186 500kV Grid RESEND: 2015_22-SAG-OC_EEHC-L-00234 Alternative Structures for Air Defense Forces Burullus project Executive Order 2015_22-SAG-OC_EEHC-L-00246 - Site Preparation Agreement Quantities
No
20.07.2016
Completed
2015_22-OC_EEHC-SAG-E-00234 2015_22-OC_EEHC-SAG-E-00244 2015_22-OC_EEHC-SAG-E-00246
2015_22_EEHC_SAG-OC-E-00256 2015_22-SAG-OC_EEHC-L-00257 2015_22-SAG-OC_EEHC-L-00274 2015_22-SAG-OC_EEHC-L-00281 2015_22-SAG-OC_EEHC-L00174_RESEND 2015_22-SAG-OC_EEHC-L00186_RESEND 2015_22-SAG-OC_EEHC-L00234_RESEND 2015_22_EEHC_SAG-OC-L-00244 2015_22-SAG-OC_EEHC-L-00246
2015_22-SAG-OC_EEHC-L-00124 Monthly Progress Report No. 6 Part2/2 Re: 2015_22-SAG-OC_EEHC-L-00144 Notice of Force Majeure 2015_22-SAG-OC_EEHC-L-00157 Monthly Progress Report No.8 Part2/2 RE: 2015_22-SAG-OC_EEHC-L-00156 Intake and Discharge Structures - AFOA approval on temporary works 2015_22-SAG-OC_EEHC-L-00213 Monthly Progress Report No. 11 Part 2/2 Re: 2015_22-SAG-OC_EEHC-L-00256 MoM MDEPC-Meeting on site 8th November 2016 2015_22-SAG-OC_EEHC-L-00257 Monthly Progress Report No. 14 Part2/2 2015_22-SAG-OC_EEHC-L-00274 Monthly Progress Report No. 15 Part2/2 2015_22-SAG-OC_EEHC-L-00281 Monthly Progress Report No.16 Part2/2 RESEND: 2015_22-SAG-OC_EEHC-L-00174 Re Burullus/Samanoud 500 KV OHTL Tower
No No No
25.10.2016 27.11.2016 15.02.2017
Completed Completed Completed
2015_22-OC_EEHC-SAG-E-00292 2015_22-OC_EEHC-SAG-E-00293 2015_22-OC_EEHC-SAG-E-00294 2015_22-OC_EEHC-SAG-E-00321 2015_22-OC_EEHC-SAG-E-00334 2015_22-OC_EEHC-SAG-E-00338
2015_22-SAG-OC_EEHC-L-00292_Part2 2015_22-SAG-OC_EEHC-L-00299 2015_22-SAG-OC_EEHC-L-00313 2015_22-SAG-OC_EEHC-L-00321_1 2015_22-SAG-OC_EEHC-L-00334_1 2015_22-SAG-OC_EEHC-L-00338_1
AW: 2015_22-SAG-OC_EEHC-L-00292 Monthly Progress Report No. 17 Part2/2 2015_22-SAG-OC_EEHC-L-00299 Monthly Progress Report No. 18 Part2/2 2015_22-SAG-OC_EEHC-L-00313 Monthly Progress Report No. 19 Part2/2 2015_22-SAG-OC_EEHC-L-00321 Monthly Progress Report No. 20 Part2/2 2015_22-SAG-OC_EEHC-L-00334 Monthly Progress Report No. 21 Part 2/2 RE: 2015_22-SAG-OC_EEHC-L-00338 Monthly Progress Report No. 22 Part2/2
No No No No No No
17.02.2017 18.03.2017 20.04.2017 10.05.2017 15.06.2017 14.07.2017
Completed Completed Completed Completed Completed Completed
2015_22-OC_EEHC-SAG-L-00001 2015_22-OC_EEHC-SAG-L-00002 2015_22-OC_EEHC-SAG-L-00003
2015_22_EEHC_SAG-OC-L-00001 2015_22_EEHC_SAG-OC-L-00002 2015_22_EEHC_SAG-OC-L-00003
2015_22-EEHC_SAG-OH-L-0000l Areas for laydown, Site Offices and Camp 2015-22-EEHC-SAG – OH-L-00002 Temporary Constriction Power EG 1019 CON 2015_22-EEHC_SAG-OH-L-00003 GIS Building Skeleton
No No No
17.09.2015 17.09.2015 17.09.2015
Completed Completed Completed
2015_22-OC_EEHC-SAG-L-00004 2015_22-OC_EEHC-SAG-L-00005 2015_22-OC_EEHC-SAG-L-00006
2015_22_EEHC_SAG-OC-L-00004 2015_22_EEHC_SAG-OC-L-00005 2015_22_EEHC_SAG-OC-L-00006
No No No
23.09.2015 23.09.2015 23.09.2015
Completed Completed Completed
2015_22-OC_EEHC-SAG-L-00007
2015_22_EEHC_SAG-OC-L-00007
No
23.09.2015
Completed
2015_22-OC_EEHC-SAG-L-00008
2015_22_EEHC_SAG-OC-L-00008
Letter 00004 Letter 0005 Letter 0006 WG: EG 1019 CON2015-22_EEHC-SAG – OH-L-00007 Authorized personnel for invoice signature , WG: EG 1019 CON 2015-22_EEHC-SAG – OH-L-00008 Technical Data for Fuel Oil Forwarding Pumps
No
23.09.2015
Completed
2015_22-OC_EEHC-SAG-L-00010
2015_22_EEHC_SAG-OC-L-00010
EG l0l9 CON 2015-22 EEHC-SAG - OH-L-00010 Project's Construction Water
No
29.09.2015
Completed
2015_22-OC_EEHC-SAG-L-00011 2015_22-OC_EEHC-SAG-L-00012
2015_22_EEHC_SAG-OC-L-00011 2015_22_EEHC_SAG-OC-L-00012
No No
29.09.2015 29.09.2015
Completed Completed
2015_22-OC_EEHC-SAG-L-00013
2015_22_EEHC_SAG-OC-L-00013
No
30.09.2015
Completed
2015_22-SAG-OH_EEHC-L-00027
2015_22-OC_EEHC-SAG-L-00014
2015_22_EEHC_SAG-OC-L-00014
EG 1019 CON 20 I 5 22-EEHC_SAG - OH-L-0001 I Temporary Construction power EG 1019 CON 2015 22-EEHC_SAG -OH-L-00012 Civil'ù/orks EG 1019 CON 2015_22-EEHC_SAG – OH-L-00013 Project reference Number at AFOA for EG 1019 CON 2015_22- EEHC_SAG -OH-L-00014 Boring Study Report and Topographic
2015_22-SAG-OH_EEHC-L-00026 2015_22-SAG-OC_EEHC-L-00036; 2015_22-SAG-OH_EEHC-L-00024 2015_22_EEHC_SAG-OC-L-00002; 2015_22_EEHC_SAG-OC-L-00006 2015_22-SAG-OC_EEHC-L-00033
No
01.10.2015
Completed
2015_22-OC_EEHC-SAG-L-00015 2015_22-OC_EEHC-SAG-L-00016
2015_22_EEHC_SAG-OC-L-00015 2015_22_EEHC_SAG-OC-L-00016
Yes Yes
02.10.2015 07.10.2015
09.10.2015 14.10.2015
Completed Completed
2015_22-SAG-OC_EEHC-L-00035 2015_22-SAG-OC_EEHC-L-00029; 2015_22-SAG-OH_EEHC-L-00023
2015_22-OC_EEHC-SAG-L-00017
2015_22_EEHC_SAG-OC-L-00017
Yes
07.10.2015
21.10.2015
Completed
2015_22-OC_EEHC-SAG-L-00018 2015_22-OC_EEHC-SAG-L-00019
2015_22_EEHC_SAG-OC-L-00018 2015_22_EEHC_SAG-OC-L-00019
2015_22- EEHC_SAG -OH-L-00015 Site Handover/Layout Change EG1019 CON 2015_22- EEHC_SAG-OH-L-00016 Re: GIS Building Skeleton EG 1019 CON 2015_22- EEHC_SAG – OH-L-00017 Access and Egress to Power Plant – Existing Highway EG 1019 CON 2015_22-EEHC_SAG – OH-L-00018 Delay in Temporary Construction power EG1019 CON 2015_22- EEHC_SAG-OH-L-00019 GIS Piles Boring
No Yes
06.10.2015 07.10.2015
14.10.2015
Completed Completed
2015_22-OC_EEHC-SAG-E-00174 2015_22-OC_EEHC-SAG-E-00186
10.08.2017
22.11.2016
Due
Status
Completed Completed Completed Completed
Reference to
2015_22-OC_EEHC-L-00023 2015_22-SAG-OC_EEHC-L-00029; 2015_22-SAG-OC_EEHC-L-00062 2015_22-SAG-EEHC-L-00057 2015_22-SAG-OC_EEHC-L-00059; 2015_22-SAG-OC_EEHC-L-00066 2015_22-SAG-OC_EEHC-L-00072; 2015_22-SAG-OC_MDEPC-L-00003 2015_22-SAG-OC_EEHC-L-00060 2015_22-SAG-OC_EEHC-L-00062 2015_22-SAG-OC_EEHC-L-00108
2015_22-SAG-OC_EEHC-L-00213 2015_22-SAG-OC_EEHC-L-00256 2015_22-SAG-OC_EEHC-L-00257 2015_22-SAG-OC_EEHC-L-00281
2015_22-SAG-OC_EEHC-L-00016; 2015_22-SAG-OC_EEHC-L-00041 2015_22-OC_EEHC-L-00010 2015_22-SAG-OC_EEHC-L-00029; 2015_22-SAG-OH_EEHC-L-00018; 2015_22-SAG-OH_EEHC-L-00025 2015_22-OC_EEHC-L-00011 2015_22_EEHC_SAG-OC-L-00002
2015_22-SAG-OC_EEHC-L-00028; 2015_22-SAG-OC_EEHC-L-00038 2015_22_EEHC_SAG-OC-L-00011
Page 1 of 6
Project: EG1019 MPR No.: 23
Correspondence List (Customer to Consortium)
SIEMENS Letter-No.(int.)
Letter-No.(ext.)
2015_22-OC_EEHC-SAG-L-00020 2015_22-OC_EEHC-SAG-L-00021 2015_22-OC_EEHC-SAG-L-00022 2015_22-OC_EEHC-SAG-L-00023 2015_22-OC_EEHC-SAG-L-00024 2015_22-OC_EEHC-SAG-L-00025 2015_22-OC_EEHC-SAG-L-00027 2015_22-OC_EEHC-SAG-L-00028 2015_22-OC_EEHC-SAG-L-00029
2015_22_EEHC_SAG-OC-L-00020 2015_22_EEHC_SAG-OC-L-00021 2015_22_EEHC_SAG-OC-L-00022 2015_22_EEHC_SAG-OC-L-00023 2015_22_EEHC_SAG-OC-L-00024 2015_22_EEHC_SAG-OC-L-00025 2015_22_EEHC_SAG-OC-L-00027 2015_22_EEHC_SAG-OC-L-00028 2015_22_EEHC_SAG-OC-L-00029
2015_22-OC_EEHC-SAG-L-00030 2015_22-OC_EEHC-SAG-L-00031 2015_22-OC_EEHC-SAG-L-00032 2015_22-OC_EEHC-SAG-L-00033
2015_22_EEHC_SAG-OC-L-00030 2015_22_EEHC_SAG-OC-L-00031 2015_22_EEHC_SAG-OC-L-00032 2015_22_EEHC_SAG-OC-L-00033
2015_22-OC_EEHC-SAG-L-00034 2015_22-OC_EEHC-SAG-L-00035 2015_22-OC_EEHC-SAG-L-00036 2015_22-OC_EEHC-SAG-L-00037 2015_22-OC_EEHC-SAG-L-00038 2015_22-OC_EEHC-SAG-L-00040 2015_22-OC_EEHC-SAG-L-00041 2015_22-OC_EEHC-SAG-L-00042 2015_22-OC_EEHC-SAG-L-00043 2015_22-OC_EEHC-SAG-L-00044
2015_22_EEHC_SAG-OC-L-00034 2015_22_EEHC_SAG-OC-L-00035 2015_22_EEHC_SAG-OC-L-00036 2015_22_EEHC_SAG-OC-L-00037 2015_22_EEHC_SAG-OC-L-00038 2015_22_EEHC_SAG-OC-L-00040 2015_22_EEHC_SAG-OC-L-00041 2015_22_EEHC_SAG-OC-L-00042 2015_22_EEHC_SAG-OC-L-00043 2015_22_EEHC_SAG-OC-L-00044
2015_22-OC_EEHC-SAG-L-00045 2015_22-OC_EEHC-SAG-L-00046 2015_22-OC_EEHC-SAG-L-00047
2015_22_EEHC_SAG-OC-L-00045 2015_22_EEHC_SAG-OC-L-00046 2015_22_EEHC_SAG-OC-L-00047
2015_22-OC_EEHC-SAG-L-00048
2015_22_EEHC_SAG-OC-L-00048
2015_22-OC_EEHC-SAG-L-00049
2015_22_EEHC_SAG-OC-L-00049
2015_22-OC_EEHC-SAG-L-00051 2015_22-OC_EEHC-SAG-L-00053
2015_22_EEHC_SAG-OC-L-00051 2015_22_EEHC_SAG-OC-L-00053
2015_22-OC_EEHC-SAG-L-00054
Subject EG 1019 CON 2015_22- EEHC_SAG – OC-L-00020 Permit Applications for Burullus Fisher Port Administration building modification Letter 22- technical data for fuel oil forwarding pumps Letter 23- Correspondences procedure Letter 24,Ultra-Sonic Test for Piles Letter 25,Hold of Camp works 2015_22- EEHC_SAG –OC-L-00026 Intake and discharge pipe lines 2015_22- EEHC _SAG-OC -L-00027 Access and Egress to Power Plant EG 1019 CON 2015_22-EEHC_SAG – OC-L-00029 Works on Camp EG1019 CON 2015_22- EEHC_SAG-OC-L-00030 Nomination of additional cladding supplier 2015_22- EEHC_SAG-OC-L-00031 Civil Work problems on Site EG1019 CON 2015_22- EEHC_SAG-OC -L-00032 MV Cables Routes 2015_22- EEHC_SAG-OC -L-00033 GIS Building Drawings
Reply Req. Corr. Date
Status
Reference to 2015_22-SAG-EEHC-L-00056
23.10.2015 23.10.2015 06.11.2015 06.11.2015 05.11.2015
Completed Completed Completed Completed Completed Completed Completed Completed Completed
01.11.2015 02.11.2015 02.11.2015 07.11.2015
06.11.2015 07.11.2015 03.11.2015 12.11.2015
Completed Completed Completed Completed
Yes No Yes Yes Yes Yes No Yes No No
08.11.2015 16.11.2015 17.11.2015 17.11.2015 21.11.2015 22.11.2015 23.11.2015 05.12.2015 05.12.2015 05.12.2015
13.11.2015
Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
Yes Yes Yes
06.12.2015 06.12.2015 06.12.2015
16.12.2015 11.12.2015 11.12.2015
No
08.12.2015
No
08.12.2015
Yes No
10.12.2015 14.12.2015
No
15.12.2015
2015_22- EEHC_SAG-OC -L-00055 Offer of Hydrogen generation plant 2015_22- EEHC_SAG-OC-L-00057 Recommended Spare Parts List for BoP 2015_22- EEHC_SAG-OC-L-00058 Data For Auxiliary Systems
Yes Yes Yes
17.12.2015 19.12.2015 05.01.2016
23.12.2015 25.12.2015 08.04.2016
Completed Completed Completed
Yes Yes Yes Yes
20.12.2015 25.12.2015 28.12.2015 28.12.2015
22.12.2015 01.01.2016 04.01.2016 06.01.2016
Completed Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00121; 2015_22-SAG-OC_EEHC-L-00140 2015_22-OC_EEHC-L-00057 2015_22-SAG-OC_EEHC-L-00091 2015_22-SAG-OC_EEHC-L-00075
Yes
29.12.2015
05.01.2016
Completed
2015_22-SAG-OC_EEHC-L-00091
2015_22_EEHC_SAG-OC-L-00064 2015_22_EEHC_SAG-OC-L-00065
2015_22-EEHC_SAG -OC-L-00059 Work Permit for Foreign Manpower 2015_22- EEHC_SAG-OC-L-00060 Cooling Water Pipelines 2015_22- EEHC_SAG-OC -L-00061 Backfilling of Gas Reducing Station 2015_22- EEHC_SAG-OC-L-00062 Detailing Scope for H2 Generation Plant EG1019 CON 2015_22- EEHC_SAG-OC -L-00063 Backfilling of Gas Reducing Station 1 EG1019 CON 2015_22- EEHC_SAG-OC -L-00064 Backfilling of Gas Reducing Station 1 2015_22-EEHC_ SAG-OC-L-00065 Nomination of additional LV Cables Supplier
Yes No
30.12.2015 31.12.2015
06.01.2016
Completed Completed
2015_22-SAG-OC_EEHC-L-00091
2015_22-OC_EEHC-SAG-L-00066 2015_22-OC_EEHC-SAG-L-00067
2015_22_EEHC_SAG-OC-L-00066 2015_22_EEHC_SAG-OC-L-00067
EG1019 CON 2015_22- EEHC_SAG-OC-L-00066 Re- Nomination of Underground Fire Fighting Accessories Suppliers and HDPE Underground Fire Pipes FM200 Suppliers Yes 2015_22- EEHC_SAG-OC-L-00067 Re- Backfilling of Gas Reducing Station No
02.01.2016 03.01.2016
08.01.2016
Completed Completed
2015_22-OC_EEHC-SAG-L-00068 2015_22-OC_EEHC-SAG-L-00069 2015_22-OC_EEHC-SAG-L-00070 2015_22-OC_EEHC-SAG-L-00071 2015_22-OC_EEHC-SAG-L-00072 2015_22-OC_EEHC-SAG-L-00073
2015_22_EEHC_SAG-OC-L-00068 2015_22_EEHC_SAG-OC-L-00069 2015_22_EEHC_SAG-OC-L-00070 2015_22_EEHC_SAG-OC-L-00071 2015_22_EEHC_SAG-OC-L-00072 2015_22_EEHC_SAG-OC-L-00073
EG1019 CON 2015_22- EEHC_SAG-OC-L-00068 Works Required for Gas Reducing 2015_22- EEHC_SAG-OC -L-00069 Meeting about Gas Reducing Station 2015_22- EEHC_SAG-OC-L-00070 Pile Tests for Central Control Building 2015_22- EEHC_SAG-OC-L-00071 Alternatives to Raised Floor 2015_22-EEHC_SAG-OC-L-00072 RE Nomination of Underground Fire Fighting 2015_22- EEHC_SAG-OC-L-00073 Floor and Wall Tiles
No Yes No Yes Yes Yes
05.01.2016 07.01.2016 08.01.2016 11.01.2016 11.01.2016 12.01.2016
2015_22-OC_EEHC-SAG-L-00074
2015_22_EEHC_SAG-OC-L-00074
2015_22- EEHC_SAG-OC-L-00074 Execution of the Gas Reducing Station
No
17.01.2016
2015_22-OC_EEHC-SAG-L-00075 2015_22-OC_EEHC-SAG-L-00076
2015_22_EEHC_SAG-OC-L-00075 2015_22_EEHC_SAG-OC-L-00076
2015_22- EEHC_SAG-OC -L-00075 Water Table Level of the Gas Reducing Station 2015_22- EEHC_SAG-OC-L-00076 RE Nomination of Underground Fire Fighting.
Yes No
15.01.2016 17.01.2016
22.01.2016
Completed Completed
2015_22-OC_EEHC-SAG-L-00077
2015_22_EEHC_SAG-OC-L-00077
2015_22- EEHC_SAG-OC-L-00077 Pile Coordinates for Gas Reducing Station
Yes
19.01.2016
26.01.2016
Completed
2015_22-OC_EEHC-SAG-L-00078 2015_22-OC_EEHC-SAG-L-00079
2015_22_EEHC_SAG-OC-L-00078 2015_22_EEHC_SAG-OC-L-00079
2015_22- EEHC_SAG-OC-L-00078 RE Raised Floor for Central Buildings CON 2015_22- EEHC_SAG-OC-L-00079 Ceramic tiles types and codes
Yes No
20.01.2016 22.01.2016
27.01.2016
Completed Completed
No Yes Yes No Yes Yes Yes Yes Yes
08.10.2015 10.10.2015 11.10.2015 11.10.2015 17.10.2015 17.10.2015 31.10.2015 31.10.2015 31.10.2015
Yes Yes Yes Yes
2015_22_EEHC_SAG-OC-L-00054
EG1019 CON 2015_22- EEHC_SAG-OC-L-00034 Intake and discharge pipe lines. EG1019 CON 2015_22- EEHC_SAG-OC-L-00035 Broken Dowels EG 1019 CON 2015_22- EEHC_SAG- OC-L-00036 RE: Load List for Auxiliaries EG1019 CON 2015_22- EEHC_SAG-OC -L-00037 Layout Change 2015_ 22-EEHC_SAG-OC-L-00038 30 MVA Commissioning Power EG1019 CON 2015_22- EEHC_SAG-OC -L-00040 Temporary RO 2015_22- EEHC_SAG-OC -L-00041 Letter to Minister of Transportation 2015_22- EEHC_SAG-OC-L-00042 Layout Change 2015_22- EEHC_SAG-OC-L-00043 Nomination of additional Cables Suppliers 2015_22- EEHC_SAG-OC-L-00044 Nomination of additional Cable Trays Supplier EG 1019 CON 2015_22- EEHC_SAG-OC-L-00045 Reduction of generators and unit transformers ratings 2015_22- EEHC_SAG-OC-L-00046 Reminder: Broken Dowels 2015_22- EEHC_SAG-OC-L-00047 Tests on Working Piles for GIS Building EG1019 CON 2015_22- EEHC_SAG-OC -L-00048 – Re Contractor RO plant- Rejected Water Line EG1019 CON 2015_22- EEHC_SAG-OC -L-00049 – Re: Access and Egress to Power Plant - Existing Highway EG1019 CON 2015_22- EEHC_SAG-OC -L-00051 – Re: Temporary R.O Plant constructed by the owner (Reject Well) 2015_22- EEHC_SAG-OC-L-00053 Temporary and Permanent Fences 2015_22- EEHC_SAG -OC-L-00054 RE Nomination of additional Cable Trays Supplier and Nomination of additional Cable Supplier.
2015_22-OC_EEHC-SAG-L-00055 2015_22-OC_EEHC-SAG-L-00057 2015_22-OC_EEHC-SAG-L-00058
2015_22_EEHC_SAG-OC-L-00055 2015_22_EEHC_SAG-OC-L-00057 2015_22_EEHC_SAG-OC-L-00058
2015_22-OC_EEHC-SAG-L-00059 2015_22-OC_EEHC-SAG-L-00060 2015_22-OC_EEHC-SAG-L-00061 2015_22-OC_EEHC-SAG-L-00062
2015_22_EEHC_SAG-OC-L-00059 2015_22_EEHC_SAG-OC-L-00060 2015_22_EEHC_SAG-OC-L-00061 2015_22_EEHC_SAG-OC-L-00062
2015_22-OC_EEHC-SAG-L-00063
2015_22_EEHC_SAG-OC-L-00063
2015_22-OC_EEHC-SAG-L-00064 2015_22-OC_EEHC-SAG-L-00065
10.08.2017
Target Date 16.10.2015 15.10.2015
24.11.2015 24.11.2015 26.11.2015 26.11.2015 11.12.2015
Due
2015_22-SAG-OC_EEHC-L-00043 2015_22-SAG-OC_EEHC-L-00031 2015_22-OC_EEHC-L-00018
2015_22-SAG-OC_EEHC-L-00049
2015_22-OC_EEHC-L-00049 2015_22-SAG-OC_EEHC-L-00069 2015_22-SAG-OC_EEHC-L-00062 2015_22-SAG-OC_EEHC-L-00047 2015_22-SAG-OC_EEHC-L-00048 2015_22-SAG-OC_EEHC-L-00062 2015_22-OC_EEHC-L-00042 2015_22-OC_EEHC-L-00043
Completed Completed Completed Completed Completed
17.12.2015
Completed Completed
2015_22-OC_EEHC-L-00039
Completed
18.01.2016 17.01.2016 26.01.2016 17.01.2016
Completed Completed Completed Completed Completed Completed Completed
2015_22_EEHC_SAG-OC-L-00050; 2015_22-SAG-OC_EEHC-L-00075 2015_22-SAG-EEHC-L-00151
2015_22-OC_EEHC-L-00063; 2015_22OC_EEHC-L-00064
2015_22-SAG-OC_EEHC-L-00091 2015_22-SAG-OC_EEHC-L-00083 2015_22-OC_EEHC-L-00070 2015_22-SAG-OC_EEHC-L-00088 2015_22_EEHC_SAG-OC-L-00067; 2015_22-SAG-OC_EEHC-L-00091 2015_22-OC_EEHC-L-00075 2015_22-OC_EEHC-L-00074 2015_22-OC_EEHC-L-00079; 2015_22SAG-OC_EEHC-L-00091 2015_22-SAG-OC_EEHC-L-00083; 2015_22-SAG-OC_EEHC-L-00089
Page 2 of 6
Project: EG1019 MPR No.: 23
Correspondence List (Customer to Consortium)
SIEMENS Letter-No.(int.)
Letter-No.(ext.)
Subject
Reply Req. Corr. Date
Target Date
2015_22-OC_EEHC-SAG-L-00080
2015_22_EEHC_SAG-OC-L-00080
2015_22- EEHC_SAG-OC-L-00080 Re - Preliminary Incident Report
Yes
23.01.2016
29.01.2016
Completed
2015_22-OC_EEHC-SAG-L-00081 2015_22-OC_EEHC-SAG-L-00082 2015_22-OC_EEHC-SAG-L-00084
2015_22_EEHC_SAG-OC-L-00081 2015_22_EEHC_SAG-OC-L-00082 2015_22_EEHC_SAG-OC-L-00084
2015_22- EEHC_SAG-OC-L-00081 Re - Pile Coordinates for Gas Reducing Station. 2015_22- EEHC_SAG-OC-L-00082 Laydown Area CON 2015_22- EEHC_SAG-OC -L-00084 Tiles
Yes No No
24.01.2016 27.01.2016 31.01.2016
29.01.2016
Completed Completed Completed
2015_22-OC_EEHC-SAG-L-00085
2015_22_EEHC_SAG-OC-L-00085
31.01.2016
05.02.2016
Completed
2015_22_EEHC_SAG-OC-L-00086 2015_22_EEHC_SAG-OC-L-00087 2015_22_EEHC_SAG-OC-L-00088
Yes Yes Yes
31.01.2016 31.01.2016 31.01.2016
05.02.2016 06.02.2016 05.02.2016
Completed Completed Completed
2015_22-OC_EEHC-SAG-L-00089
2015_22_EEHC_SAG-OC-L-00089
CON 2015_22- EEHC_SAG-OC -L-00085 Proposal for Fire Fighting Station Building CON 2015_22 – EEHC_SAG-OC-L-000086 Additional Supplier Nomination for " GIS HVAC" CON 2015_22- EEHC_ SAG-OC-L-00087 Raised Flooring Specimen CON 2015_22- EEHC_SAG-OC-L-00088 Western Construction Road CON 2015_22- EEHC_SAG-OC-L-00089 Approval of Egyptian Shore Protection Authority
Yes
2015_22-OC_EEHC-SAG-L-00086 2015_22-OC_EEHC-SAG-L-00087 2015_22-OC_EEHC-SAG-L-00088
Yes
31.01.2016
05.02.2016
Completed
2015_22-OC_EEHC-SAG-L-00090
2015_22_EEHC_SAG-OC-L-00090
2015_22- EEHC_SAG-OC -L-00090 Force Majeure
No
06.02.2016
2015_22-OC_EEHC-SAG-L-00091 2015_22-OC_EEHC-SAG-L-00092
2015_22_EEHC_SAG-OC-L-00091 2015_22_EEHC_SAG-OC-L-00092
2015_22- EEHC_SAG-OC -L-00091 Works in Gas Reducing Station CON 2015_22- EEHC_SAG-OC -L-00092 Coordinates of Laydown Area
Yes Yes
07.02.2016 11.02.2016
12.02.2016 18.02.2016
Completed Completed
2015_22-OC_EEHC-SAG-L-00093 2015_22-OC_EEHC-SAG-L-00094 2015_22-OC_EEHC-SAG-L-00095
2015_22_EEHC_SAG-OC-L-00093 2015_22_EEHC_SAG-OC-L-00094 2015_22_EEHC_SAG-OC-L-00095
CON 2015_22- EEHC_SAG-OC -L-00093 Interface Points in Gas Reducing Station 2015_22- EEHC_SAG-OC -L-00094 EHS Notices (1) 2015_22- EEHC_SAG-OC -L-00095 EHS Notices (2)
Yes Yes Yes
11.02.2016 14.02.2016 14.02.2016
25.02.2016 19.02.2016 19.02.2016
Completed Completed Completed
2015_22-OC_EEHC-SAG-L-00096 2015_22-OC_EEHC-SAG-L-00097
2015_22_EEHC_SAG-OC-L-00096 2015_22_EEHC_SAG-OC-L-00097
Yes Yes
15.02.2016 16.02.2016
22.02.2016 23.02.2016
Completed Completed
2015_22-OC_EEHC-SAG-L-00098 2015_22-OC_EEHC-SAG-L-00099 2015_22-OC_EEHC-SAG-L-00100 2015_22-OC_EEHC-SAG-L-00101
2015_22_EEHC_SAG-OC-L-00098 2015_22_EEHC_SAG-OC-L-00099 2015_22_EEHC_SAG-OC-L-00100 2015_22_EEHC_SAG-OC-L-00101
2015-22- EEHC_SAG-OC -L-00096 Raised Flooring Guarantee 2015-22- EEHC_SAG-OC -L-00097 Fire Fighting Building 2015_22- EEHC_SAG-OC -L-00098 Nomination of additional Low Voltage Cables Supplier _22- EEHC_SAG-OC -L-00099 Nomination of additional I&C Cables Supplier 2015_22- EEHC_SAG-OC -L-00100 Piping Route of Temporary R.O. 2015_22- EEHC_SAG-OC -L-00101 Radiography Documents for Gas Pipe Line
Yes Yes Yes No
16.02.2016 16.02.2016 19.02.2016 21.02.2016
25.02.2016 23.02.2016 16.01.2017
Completed Completed Completed Completed
2015_22-OC_EEHC-L-00089 2015_22-OC_EEHC-L-00088
2015_22-OC_EEHC-SAG-L-00102 2015_22-OC_EEHC-SAG-L-00103 2015_22-OC_EEHC-SAG-L-00104 2015_22-OC_EEHC-SAG-L-00105 2015_22-OC_EEHC-SAG-L-00106
2015_22_EEHC_SAG-OC-L-00102 2015_22_EEHC_SAG-OC-L-00103 2015_22_EEHC_SAG-OC-L-00104 2015_22_EEHC_SAG-OC-L-00105 2015_22_EEHC_SAG-OC-L-00106
No Yes Yes Yes Yes
23.02.2016 23.02.2016 22.02.2016 23.02.2016 27.02.2016
Completed Completed Completed Completed Completed
2015_22-OC_EEHC-L-00085 2015_22-SAG-OC_EEHC-L-00118
2015_22-OC_EEHC-SAG-L-00107 2015_22-OC_EEHC-SAG-L-00108 2015_22-OC_EEHC-SAG-L-00109
2015_22_EEHC_SAG-OC-L-00107 2015_22_EEHC_SAG-OC-L-00108 2015_22_EEHC_SAG-OC-L-00109
2015_22-EEHC_SAG-OC-L-00102 Referenced system for laydown Area coordinates 2015_22- EEHC_SAG-OC -L-00103 Force Majeure 2015_22- EEHC_SAG-OC -L-00104 Provision of IT Facilities 2015_22- EEHC_SAG-OC -L-00105 Re: Raised Flooring Guarantee 2015_22- EEHC_SAG –OC- L- 00106 HSE (3) WG: CON 2015_22- EEHC_SAG –OC- L- 00107 Site Protection Measures against Seawater Inundation 2015_22- EEHC_SAG-OC -L-00108 Roll-Up Door in Warehouse Building 2015_22- EEHC_SAG –OC- L- 00109 Corrective Measures of EHS
Yes No No
29.02.2016 28.02.2016 28.02.2016
07.03.2016
Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00126
2015_22-OC_EEHC-SAG-L-00110
2015_22_EEHC_SAG-OC-L-00110
Yes
29.02.2016
08.03.2016
Completed
2015_22-OC_EEHC-L-00101
2015_22-OC_EEHC-SAG-L-00111
2015_22_EEHC_SAG-OC-L-00111
2015_22- EEHC_SAG-OC -L-00110 Re Nomination of additional ICC Cables Supplier 2015_22- EEHC_SAG-OC -L-00111 Nomination of additional Fire-fighting Pipes Suppliers
No
29.02.2016
Completed
2015_22-OC_EEHC-L-00098
2015_22-OC_EEHC-SAG-L-00112
2015_22_EEHC_SAG-OC-L-00112
2015_22- EEHC_SAG-OC -L-00112 Coordinates and Depth of Temporary R.O. Pipes
Yes
29.02.2016
Completed
2015_22-OC_EEHC-L-00099
2015_22-OC_EEHC-SAG-L-00113
2015_22_EEHC_SAG-OC-L-00113
L-00113 Nomination of additional Standard Carbon steel and St. Steel Pipes Suppliers No
05.03.2016
Completed
2015_22-OC_EEHC-SAG-L-00114 2015_22-OC_EEHC-SAG-L-00115 2015_22-OC_EEHC-SAG-L-00116 2015_22-OC_EEHC-SAG-L-00118
2015_22_EEHC_SAG-OC-L-00114 2015_22_EEHC_SAG-OC-L-00115 2015_22_EEHC_SAG-OC-L-00116 2015_22_EEHC_SAG-OC-L-00118
Yes Yes Yes Yes
06.03.2016 08.03.2016 08.03.2016 12.03.2016
14.03.2016 18.03.2016 18.03.2016 18.03.2016
Completed Completed Completed Completed
2015_22-OC_EEHC-L-00104 2015_22-SAG-OC_EEHC-L-00094; 2015_22-SAG-OC_EEHC-L-00128 2015_22-OC_EEHC-L-00100 2015_22_EEHC_SAG-OC-L-00103
2015_22-OC_EEHC-SAG-L-00119
2015_22_EEHC_SAG-OC-L-00119
Yes
15.03.2016
23.03.2016
Completed
2015_22-OC_EEHC-SAG-L-00120 2015_22-OC_EEHC-SAG-L-00121
2015_22_EEHC_SAG-OC-L-00120 2015_22_EEHC_SAG-OC-L-00121
2015_22- EEHC_SAG-OC-L-00114 EHS (4) 2015_22- EEHC_SAG-OC -L-00115 Power Supply of Water Treatment 2015_22- EEHC_SAG-OC -L-00116 Provisions of Office Facilities 2015_22- EEHC_SAG-OC-L-00118 Re: Western Construction Road 2015_22- EEHC_SAG-OC -L-00119 Re-Site Protection Measures against seawater inundation. 2015_22-EEHC_SAG-OC-L-00120 RE: Nomination of additional Standard Carbon steel and St. Steel Pipes Suppliers. 2015_22- EEHC_SAG-OC-L-00121 Re: Re: Raised Flooring Guarantee
Yes Yes
18.03.2016 18.03.2016
29.03.2016 29.03.2016
Completed Completed
2015_22-OC_EEHC-SAG-L-00122 2015_22-OC_EEHC-SAG-L-00123
2015_22_EEHC_SAG-OC-L-00122 2015_22_EEHC_SAG-OC-L-00123
Yes Yes
21.03.2016 19.03.2016
29.03.2016 29.03.2016
Completed Completed
2015_22-OC_EEHC-SAG-L-00124
2015_22_EEHC_SAG-OC-L-00124
2015_22- EEHC_SAG-OC-L-00122 Weather Conditions 2015_22- EEHC_SAG-OC-L-00123 Unapproved Suppliers 2015_22- EEHC_SAG-OC-L-00124 Nomination of additional Fire-Fighting System Supplier
Yes
21.03.2016
29.03.2016
Completed
2015_22-OC_EEHC-SAG-L-00125
2015_22_EEHC_SAG-OC-L-00125
21.03.2016
29.03.2016
Completed
2015_22_EEHC_SAG-OC-L-00126 2015_22_EEHC_SAG-OC-L-00127 2015_22_EEHC_SAG-OC-L-00128
2015_22-EEHC_SAG-OC-L-00125 Demin.Water System 2015_22- EEHC_SAG-OC-L-00126 Nomination of additional HDPE underground Pipes 2015_22-EEHC_SAG-OC-L-00127 Demin.Water System 2015_22- EEHC_SAG-OC-L-00128 Termination of works in gas reducing station
Yes
2015_22-OC_EEHC-SAG-L-00126 2015_22-OC_EEHC-SAG-L-00127 2015_22-OC_EEHC-SAG-L-00128
Yes Yes Yes
22.03.2016 28.03.2016 29.03.2016
29.03.2016 07.04.2016 07.04.2016
Completed Completed Completed
10.08.2017
Due
Status
Completed
07.03.2016 29.02.2016 07.03.2016 07.03.2016
08.03.2016
Reference to 2015_22-SAG-OC_EEHC-L-00087; 2015_22-SAG-OC_EEHC-L-00090 2015_22-SAG-OC_EEHC-L-00091
2015_22-OC_EEHC-L-00084
2015_22-SAG-OC_EEHC-L-00094; 2015_22-SAG-OC_EEHC-L-00101 2015_22_EEHC_SAG-OC-L-00064; 2015_22-SAG-OC_EEHC-L-00091; 2015_22-SAG-OC_EEHC-L-00119
2015_22-SAG-OC_EEHC-L-00119 2015_22-SAG-OC_EEHC-L-00125 2015_22-SAG-OC_EEHC-L-00125 2015_22_EEHC_SAG-OC-L-00071; 2015_22_EEHC_SAG-OC-L-00078; 2015_22_EEHC_SAG-OC-L-00087; 2015_22-OC_EEHC-L-00090 2015_22-OC_EEHC-L-00091
2015_22-SAG-OC_EEHC-L-00105
2015_22-SAG-OC_EEHC-L-00125
2015_22-OC_EEHC-L-00093 2015_22-OC_EEHC-L-00104; 2015_22OC_EEHC-L-00115 2015_22_EEHC_SAG-OC-L-00105 2015_22-SAG-OC_EEHC-L-00131; 2015_22-SAG-OC_EEHC-L-00134
2015_22-OC_EEHC-L-00113 2015_22-OC_EEHC-L-00110; 2015_22OC_EEHC-L-00152 2015_22-OC_EEHC-L-00116 2015_22-OC_EEHC-L-00117
Page 3 of 6
Project: EG1019 MPR No.: 23
Correspondence List (Customer to Consortium)
SIEMENS Letter-No.(int.)
Letter-No.(ext.)
2015_22-OC_EEHC-SAG-L-00129 2015_22-OC_EEHC-SAG-L-00130 2015_22-OC_EEHC-SAG-L-00131
2015_22_EEHC_SAG-OC-L-00129 2015_22_EEHC_SAG-OC-L-00130 2015_22_EEHC_SAG-OC-L-00131
2015_22-OC_EEHC-SAG-L-00132
2015_22_EEHC_SAG-OC-L-00132
2015_22-OC_EEHC-SAG-L-00133
2015_22_EEHC_SAG-OC-L-00133
2015_22-OC_EEHC-SAG-L-00134
2015_22_EEHC_SAG-OC-L-00134
2015_22-OC_EEHC-SAG-L-00135 2015_22-OC_EEHC-SAG-L-00136 2015_22-OC_EEHC-SAG-L-00137 2015_22-OC_EEHC-SAG-L-00138 2015_22-OC_EEHC-SAG-L-00139
2015_22_EEHC_SAG-OC-L-00135 2015_22_EEHC_SAG-OC-L-00136 2015_22_EEHC_SAG-OC-L-00137 2015_22_EEHC_SAG-OC-L-00138 2015_22_EEHC_SAG-OC-L-00139
2015_22-OC_EEHC-SAG-L-00140
2015_22_EEHC_SAG-OC-L-00140
2015_22-OC_EEHC-SAG-L-00141
2015_22_EEHC_SAG-OC-L-00141
2015_22-OC_EEHC-SAG-L-00142
2015_22_EEHC_SAG-OC-L-00142
2015_22-OC_EEHC-SAG-L-00143 2015_22-OC_EEHC-SAG-L-00144
Subject 2015_22- EEHC_SAG-OC-L-00129 Reminder: Re-Site Protection Measures Against Seawater Inundation. 2015_22- EEHC_SAG-OC-L-00130 Decennial Liability Insurance Certificate 2015_22- EEHC_SAG-OC -L-00131 Extra Works in Gas Reducing Station CON 2015_22- EEHC_SAG-OC-L-00132 RE Nomination of additional Fire Fighting Supplier 2015_22- EEHC_SAG-OC-L-00133 Nomination of additional HDPE underground Pipes Suppliers 2015_22- EEHC_SAG-OC-L-00134 Nomination of additional HDPE underground Pipes Suppliers 2015_22- EEHC_SAG-OC-L-00135 Nomination of additional Standard Carbon Steel and St. Steel suppliers 2015_22- EEHC_SAG-OC -L-00136 Accredited Design of Buildings 2015_22- EEHC_SAG-OC -L-00137 Sufficiency of Site Protection Measures L-00138 Re: Nomination of additional HDPE underground Pipes Suppliers. 2015_22- EEHC_SAG-OC-L-00139 Unapproved Suppliers 2015_22-EEHC_SAG-OC-L-00140 Cooling Water Pipelines-Nomination of additional HDPE underground Pipes Suppliers CON 2015_22-EEHC_SAG-OC- L-00141 RE Nomination of additional standard Carbon Steel and St. Steel
Reply Req. Corr. Date
Target Date
Yes Yes Yes
29.03.2016 29.03.2016 02.04.2016
06.04.2016 06.04.2016 12.04.2016
No
03.04.2016
Yes
03.04.2016
Yes
03.04.2016
Yes Yes Yes Yes Yes
Due
Status Completed Completed Completed
Reference to 2015_22_EEHC_SAG-OC-L-00119; 2015_22_EEHC_SAG-OC-L-00137 2015_22-SAG-OC_EEHC-L-00193
Completed
2015_22-OC_EEHC-L-00121
12.04.2016
Completed
2015_22-OC_EEHC-L-00119
12.04.2016
Completed
2015_22-OC_EEHC-L-00122
03.04.2016 06.04.2016 06.04.2016 06.04.2016 08.04.2016
12.04.2016 18.04.2016 18.04.2016 18.04.2016 18.04.2016
Completed Completed Completed Completed Completed
2015_22-OC_EEHC-L-00124
Yes
13.04.2016
22.04.2016
Completed
2015_22-OC_EEHC-L-00129
Yes
15.04.2016
26.04.2016
Completed
Yes
15.04.2016
26.04.2016
Completed
2015_22-OC_EEHC-L-00132 2015_22-SAG-OC_EEHC-L-00123; 2015_22-SAG-OC_EEHC-L-00151
2015_22_EEHC_SAG-OC-L-00143
CON 2015_22- EEHC_SAG-OC -L-00142 Factory Inspection Test CON 2015_22- EEHC_SAG-OC -L-00143 Obstructions of Construction Power Completion
Yes
16.04.2016
26.04.2016
Completed
2015_22_EEHC_SAG-OC-L-00144
2015_22- EEHC_SAG-OC-L-00144 Nomination of Additional Steel Plates Suppliers
Yes
19.04.2016
29.04.2016
Completed
2015_22-OC_EEHC-SAG-L-00145
2015_22_EEHC_SAG-OC-L-00145
2015_22- EEHC_SAG-OC -L-00145 Selected Factory Tests
Yes
21.04.2016
29.04.2016
Completed
2015_22-OC_EEHC-SAG-L-00146 2015_22-OC_EEHC-SAG-L-00147
2015_22_EEHC_SAG-OC-L-00146 2015_22_EEHC_SAG-OC-L-00147
Yes Yes
25.04.2016 03.05.2016
04.05.2016 10.05.2016
Completed Completed
2015_22-OC_EEHC-SAG-L-00148 2015_22-OC_EEHC-SAG-L-00149 2015_22-OC_EEHC-SAG-L-00150 2015_22-OC_EEHC-SAG-L-00151 2015_22-OC_EEHC-SAG-L-00152
2015_22_EEHC_SAG-OC-L-00148 2015_22_EEHC_SAG-OC-L-00149 2015_22_EEHC_SAG-OC-L-00150 2015_22_EEHC_SAG-OC-L-00151 2015_22_EEHC_SAG-OC-L-00152
No No Yes No No
27.04.2016 30.04.2016 03.05.2016 03.05.2016 05.05.2016
10.05.2016
Completed Completed Completed Completed Completed
2015_22-OC_EEHC-SAG-L-00153
2015_22_EEHC_SAG-OC-L-00153
Yes
06.05.2016
25.05.2016
Completed
2015_22-OC_EEHC-SAG-L-00154
2015_22_EEHC_SAG-OC-L-00154
No
08.05.2016
2015_22-OC_EEHC-SAG-L-00155
2015_22_EEHC_SAG-OC-L-00155
Yes
12.05.2016
2015_22-OC_EEHC-SAG-L-00156
2015_22_EEHC_SAG-OC-L-00156
No
14.05.2016
2015_22-OC_EEHC-SAG-L-00157
2015_22_EEHC_SAG-OC-L-00157
Yes
15.05.2016
2015_22-OC_EEHC-SAG-L-00158 2015_22-OC_EEHC-SAG-L-00159 2015_22-OC_EEHC-SAG-L-00160
2015_22_EEHC_SAG-OC-L-00158 2015_22_EEHC_SAG-OC-L-00159 2015_22_EEHC_SAG-OC-L-00160
Yes Yes Yes
17.05.2016 17.05.2016 21.05.2016
2015_22-OC_EEHC-SAG-L-00161 2015_22-OC_EEHC-SAG-L-00162
2015_22_EEHC_SAG-OC-L-00161 2015_22_EEHC_SAG-OC-L-00162
Yes Yes
2015_22-OC_EEHC-SAG-L-00163 2015_22-OC_EEHC-SAG-L-00164 2015_22-OC_EEHC-SAG-L-00165
2015_22_EEHC_SAG-OC-L-00163 2015_22_EEHC_SAG-OC-L-00164 2015_22_EEHC_SAG-OC-L-00165
2015_22-OC_EEHC-SAG-L-00166 2015_22-OC_EEHC-SAG-L-00167
2015_22_EEHC_SAG-OC-L-00166 2015_22_EEHC_SAG-OC-L-00167
2015_22-OC_EEHC-SAG-L-00168 2015_22-OC_EEHC-SAG-L-00169 2015_22-OC_EEHC-SAG-L-00170
2015_22_EEHC_SAG-OC-L-00168 2015_22_EEHC_SAG-OC-L-00169 2015_22_EEHC_SAG-OC-L-00170
2015_22- EEHC_SAG-OC-L-00163 Delays in Project Time Schedule 2015_22-EEHC_SAG-OC-L-00164 RE: Notice for factory inspection test 2015_22-EEHC_SAG-OC-L-00165 Nomination of Additional Piping Suppliers 2015_22-EEHC_SAG-OC-L-00166 Re Nomination of additional carbon steel and st. steel pipes, valves and fittings supplier 4 2015_22-EEHC_SAG-OC-L-00167 Packing Lists No. 084 & 094 CON 2015_22-EEHC_SAG-OC-L-00168 RE Nomination of additional carbon steel and stainless steel pipes, valves and fittings supplier _22-EEHC_SAG-OC-L-00169 Works in Firefighting Water Tank 2015_22-EEHC_SAG-OC-L-00170 Nomination of Additional Piping Supplier
2015_22-OC_EEHC-SAG-L-00171 2015_22-OC_EEHC-SAG-L-00172
2015_22_EEHC_SAG-OC-L-00171 2015_22_EEHC_SAG-OC-L-00172
2015_22-OC_EEHC-SAG-L-00173 2015_22-OC_EEHC-SAG-L-00174
2015_22_EEHC_SAG-OC-L-00173 2015_22_EEHC_SAG-OC-L-00174
10.08.2017
2015_22-EEHC_SAG-OC-L-00146 Nomination of additional Carbon steel and Stainless steel pipes Supplier 2015_22-EEHC_SAG-OC-L-00147 Discrepancy of Piles in Units 2015_22-EEHC_SAG-OC-L-00148 Nomination of additional Electromechanical Subcontractors 2015_22- EEHC_SAG-OC -L-00149 Re Unapproved Suppliers 2015_22- EEHC_SAG-OC-L-00150 EHS (5) 2015_22- EEHC_SAG-OC-L-00151 Nomination of additional RCCP pipes Supplier 2015_22- EEHC_SAG-OC-L-00152 Approval for additional Laydown Area 2015_22- EEHC_SAG-OC-L-00153 RE Nomination of additional Carbon Steel and Stainless Steel Pipes, Valve and Fittings Supplier 2 2015_22- EEHC_SAG-OC-L-00154 RE Nomination of Additional Steel Structure Supplier
2015_22-OC_EEHC-L-00224 2015_22-OC_EEHC-L-00127 2015_22_EEHC_SAG-OC-L-00123
2015_22-OC_EEHC-L-00131 2015_22-SAG-EEHC-L-00250; 2015_22-SAG-OC_EEHC-L-00123 2015_22_EEHC_SAG-OC-L-00138; 2015_22-OC_EEHC-L-00139; 2015_22OC_EEHC-L-00140
2015_22-OC_EEHC-L-00142 2015_22-OC_EEHC-L-00133 2015_22-SAG-OC_EEHC-L-00173 2015_22-OC_EEHC-L-00145
Completed
2015_22-OC_EEHC-L-00131; 2015_22OC_EEHC-L-00147
Completed
2015_22-SAG-OC_EEHC-L-00155; 2015_22-SAG-OC_EEHC-L-00158
Completed
2015_22-OC_EEHC-L-00150
25.05.2016
Completed
2015_22-OC_EEHC-L-00156
25.05.2016 16.01.2017 01.06.2016
Completed Completed Completed
2015_22-OC_EEHC-L-00157 2015_22-SAG-EEHC-L-00275 2015_22-SAG-EEHC-L-00264
21.05.2016 22.05.2016
01.06.2016 01.06.2016
Completed Completed
2015_22-OC_EEHC-L-00162
Yes No No
23.05.2016 23.05.2016 25.05.2016
01.06.2016
Completed Completed Completed
Yes Yes
27.05.2016 27.05.2016
08.06.2016 08.06.2016
Completed Completed
2015_22-OC_EEHC-L-00174
Yes Yes Yes
29.05.2016 31.05.2016 31.05.2016
08.06.2016 08.06.2016 08.06.2016
Completed Completed Completed
2015_22-EEHC_SAG-OC-L-00171 Corrective Measures of Safety Procedures on Site 2015_22- EEHC_SAG-OC-L-00172 EHS (6)
Yes Yes
31.05.2016 31.05.2016
08.06.2016 08.06.2016
Completed Completed
_22-EEHC_SAG-OC-L-00173 Burullus/ Samanoud 500 KV OHTL Tower 2015_22-EEHC_SAG-OC-L-00174 Nomination of Additional Piping Suppliers
Yes Yes
01.06.2016 03.06.2016
13.06.2016 13.06.2016
Completed Completed
2015_22-OC_EEHC-L-00170 2015_22-OC_EEHC-L-00221 2015_22-OC_EEHC-L-00173 2015_22_EEHC_SAG-OC-L-00109; 2015_22-SAG-OC_EEHC-L-00161; 2015_22-SAG-OC_EEHC-L-00180 2015_22-SAG-OC_EEHC-L-00181 2015_22-SAG-OC_EEHC-L-00163; 2015_22-SAG-OC_EEHC-L-00174 2015_22-OC_EEHC-L-00175
2015_22- EEHC_SAG-OC-L-00155 Crossing of Heavy Shipments underneath the section of High- voltage Overhead Transmission Line (OHTL) running across the Site 2015_22-EEHC_SAG-OC-L-00156 Nomination of additional Standard Carbon Steel and St. Steel Pipes, fitting and valves Supplier 2015_22-EEHC_SAG-OC-L-00157 Re Nomination of additional standard Carbon Steel and St. Steel Pipes, Valve, and Fittings Supplier 3 CON 2015_22-EEHC_SAG-OC-L-00158 Nomination of additional Sump Pumps Suppliers CON 2015_22-EEHC_SAG-OC-L-00159 Steam Turbine Crane 2015_22- EEHC_SAG-OC-L-0160 Lack of Project Documentation CON 2015_22- EEHC_SAG-OC -L-00161 Nomination of additional carbon steel and st. steel pipes, valves and fittings supplier 3 2015_22- EEHC_SAG-OC-L-00162 Alternative Structures for Air Defense Forces
25.05.2016
2015_22-SAG-OC_EEHC-L-00157; 2015_22-SAG-OC_EEHC-L-00177 2015_22-OC_EEHC-L-00167 2015_22-OC_EEHC-L-00165
Page 4 of 6
Project: EG1019 MPR No.: 23
Correspondence List (Customer to Consortium)
SIEMENS Letter-No.(int.)
Letter-No.(ext.)
Subject
2015_22-OC_EEHC-SAG-L-00175
2015_22_EEHC_SAG-OC-L-00175
04.06.2016
13.06.2016
Completed
2015_22-OC_EEHC-SAG-L-00176
2015_22_EEHC_SAG-OC-L-00176
2015_22-EEHC_SAG-OC-L-00175 Nomination of Additional Pump Suppliers Yes 2015_22-EEHC_SAG-OC-L-00176 Shore Protection Approval on Intake and Discharge structures Yes
08.06.2016
16.06.2016
Completed
2015_22-OC_EEHC-SAG-L-00178 2015_22-OC_EEHC-SAG-L-00179
2015_22_EEHC_SAG-OC-L-00178 2015_22_EEHC_SAG-OC-L-00179
_22-EEHC_SAG-OC-L-00178 Nomination of Additional Suppliers of Valves _22-EEHC_SAG-OC-L-00179 Nomination of additional piping suppliers
Yes No
11.06.2016 11.06.2016
20.06.2016
Completed Completed
2015_22-OC_EEHC-SAG-L-00180
2015_22_EEHC_SAG-OC-L-00180
11.06.2016
20.06.2016
Completed
2015_22_EEHC_SAG-OC-L-00181 2015_22_EEHC_SAG-OC-L-00182 2015_22_EEHC_SAG-OC-L-00183
2015_22-EEHC_SAG-OC-L-00180 Nomination of Additional Sump Pumps Supplier. CON 2015_22-EEHC_SAG-OC-L-00181 Site Preparation Agreement Increase of Quantities Interim Assessment 2015_22-EEHC_SAG-OC-L-00182 Invoice documentation 2015_22-EEHC_SAG-OC-L-00183 Data for Supplied Pumps
Yes
2015_22-OC_EEHC-SAG-L-00181 2015_22-OC_EEHC-SAG-L-00182 2015_22-OC_EEHC-SAG-L-00183
Yes Yes Yes
13.06.2016 12.06.2016 15.06.2016
20.06.2016 20.06.2016 22.06.2016
Completed Completed Completed
2015_22-OC_EEHC-SAG-L-00184
2015_22_EEHC_SAG-OC-L-00184
CON 2015_22-EEHC_SAG-OC-L-00184 Support for Contractor’s R.O. Plant Operation No
16.06.2016
2015_22-OC_EEHC-SAG-L-00185 2015_22-OC_EEHC-SAG-L-00186
2015_22_EEHC_SAG-OC-L-00185 2015_22_EEHC_SAG-OC-L-00186
2015_22- EEHC_SAG-OC-L-00185 Re Invoice Documentation 2015_22- EEHC_SAG-OC-L-00186 Re-allocation of Well No.3 Pipeline
Yes Yes
28.06.2016 07.07.2016
06.07.2016 14.07.2016
Completed Completed
2015_22-OC_EEHC-SAG-L-00187
2015_22_EEHC_SAG-OC-L-00187
2015_22- EEHC_SAG-OC-L-00187 Commissioning Power Source
Yes
07.07.2016
18.07.2016
Completed
2015_22-OC_EEHC-SAG-L-00188
2015_22_EEHC_SAG-OC-L-00188
Yes
23.07.2016
01.08.2016
Completed
2015_22-OC_EEHC-SAG-L-00189
2015_22_EEHC_SAG-OC-L-00189
2015_22- EEHC_SAG-OC-L-00188 Re Delays in Project Time 2015_22-EEHC_SAG-OC-L-00189 Re: Agenda for meeting regarding construction of Gas Reducing Station by Owner/GASCO
No
12.08.2016
2015_22-OC_EEHC-SAG-L-00190 2015_22-OC_EEHC-SAG-L-00191 2015_22-OC_EEHC-SAG-L-00192
2015_22_EEHC_SAG-OC-L-00190 2015_22_EEHC_SAG-OC-L-00191 2015_22_EEHC_SAG-OC-L-00192
2015_22-EEHC_SAG-OC-L-00190 Collective Notes 2015_22-EEHC_SAG-OC-L-00191 Drawings for Inhabited Buildings 2015_22- EEHC_SAG-OC-L-00192 Missed Project Schedule
Yes No Yes
12.08.2016 12.08.2016 16.08.2016
22.08.2016 24.08.2016
Completed Completed Completed
2015_22-OC_EEHC-SAG-L-00193
2015_22_EEHC_SAG-OC-L-00193
2015_22-EEHC_SAG-OC-L-00193 Halting Works in Gas Reducing Station
Yes
18.08.2016
26.08.2016
Completed
2015_22-OC_EEHC-SAG-L-00194
2015_22_EEHC_SAG-OC-L-00194
19.08.2016
29.08.2016
Completed
2015_22_EEHC_SAG-OC-L-00195
2015_22-EEHC_SAG-OC-L-00194 Re Commissioning Power Source 2015_22-EEHC_SAG-OC-L-00195 Re: Condition of the temporary Gas Reducing Station
Yes
2015_22-OC_EEHC-SAG-L-00195
Yes
19.08.2016
29.08.2016
Completed
2015_22-OC_EEHC-SAG-L-00196
2015_22_EEHC_SAG-OC-L-00196
2015_22-EEHC_SAG-OC-L-00196 Re Final Site Layout and Security Requirements
Yes
21.08.2016
29.08.2016
Completed
2015_22-OC_EEHC-SAG-L-00197
2015_22_EEHC_SAG-OC-L-00197
2015_22-EEHC_SAG-OC-L-00197 Re Delays in Project Time (2)
Yes
04.09.2016
12.09.2016
Completed
2015_22-OC_EEHC-SAG-L-00198
2015_22_EEHC_SAG-OC-L-00198
2015_22-EEHC_SAG-OC-L-00198 Gas Reducing Station –Interface Point
Yes
04.09.2016
12.09.2016
Completed
2015_22-OC_EEHC-SAG-L-00199
2015_22-EEHC_SAG-OC-L-00199
2015_22-EEHC_SAG-OC-L-00199 Floods in China
Yes
05.09.2016
13.09.2016
Completed
2015_22-OC_EEHC-SAG-L-00200
2015_22_EEHC_SAG-OC-L-00200
2015_22-EEHC_SAG-OC-L-00200 Factory Inspection Test
Yes
06.09.2016
14.09.2016
Completed
2015_22-OC_EEHC-SAG-L-00201 2015_22-OC_EEHC-SAG-L-00202
2015_22_EEHC_SAG-OC-L-00201 2015_22_EEHC_SAG-OC-L-00202
2015_22-EEHC_SAG-OC-L-00201 Re: Offshore Works’ Permits 2015_22-EEHC_SAG-OC-L-00202 Readiness of the Gas Reducing Station
Yes Yes
07.09.2016 06.09.2016
15.09.2016 14.09.2016
Completed Completed
2015_22-OC_EEHC-SAG-L-00203
2015_22_EEHC_SAG-OC-L-00203
2015_22-EEHC_SAG-OC-L-00203 Remarks on Monthly Progress Report No.12
Yes
20.09.2016
29.09.2016
Completed
2015_22-OC_EEHC-SAG-L-00204
2015_22_EEHC_SAG-OC-L-00204
2015_22-EEHC_SAG-OC-L-00204 Re Invoice Documentation (2)
Yes
20.09.2016
29.09.2016
Completed
2015_22-OC_EEHC-SAG-L-00205
2015_22_EEHC_SAG-OC-L-00205
2015_22-EEHC_SAG-OC-L-00205 Interface Point of the Gas Reducing Station
Yes
23.09.2016
03.10.2016
Completed
10.08.2017
Reply Req. Corr. Date
Target Date
Due
Status
Completed
Completed
Reference to 2015_22-OC_EEHC-L-00177; 2015_22OC_EEHC-L-00218 2015_22-SAG-OC_EEHC-L-00166 2015_22-OC_EEHC-L-00184; 2015_22OC_EEHC-L-00198 2015_22-OC_EEHC-L-00186 2015_22-OC_EEHC-L-00187; 2015_22OC_EEHC-L-00195 2015_22-SAG-OC_EEHC-L-00162; 2015_22-SAG-OC_EEHC-L-00169 2015_22-SAG-OC_EEHC-L-00168 2015_22-SAG-OC_EEHC-L-00171 2015_22-SAG-OC_EEHC-L-00167 2015_22-SAG-EEHC-L-00303; 2015_22-SAG-OC_EEHC-L-00168; 2015_22-SAG-OC_EEHC-L-00190; 2015_22-SAG-OC_EEHC-L-00195 2015_22-OC_EEHC-L-00220 2015_22-EEHC-SAG-L-00029; 2015_22-SAG-OC_EEHC-L-00175; 2015_22-SAG-OC_EEHC-L-00210 2015_22-SAG-OC_EEHC-L-00177; 2015_22-SAG-OC_EEHC-L-00200 2015_22-SAG-OC_EEHC-L-00211 2015_22-SAG-EEHC-L-00317; 2015_22-SAG-EEHC-L-00318; 2015_22-SAG-EEHC-L-00319; 2015_22-SAG-EEHC-L-00322 2015_22-OC_EEHC-L-00241 2015_22-SAG-OC_EEHC-L-00225 2015_22-SAG-OC_EEHC-L-00215; 2015_22-SAG-OC_EEHC-L-00243 2015_22-EEHC-SAG-L-00029; 2015_22-SAG-OC_EEHC-L-00210; 2015_22-SAG-OC_EEHC-L-00220 2015_22-SAG-OC_EEHC-L-00212; 2015_22-SAG-OC_EEHC-L-00218 2015_22_EEHC_SAG-OC-L-00053; 2015_22_EEHC_SAG-OC-L-00097; 2015_22-EEHC_OC-L-00013; 2015_22SAG-OC_EEHC-L-00184 2015_22-SAG-OC_EEHC-L-00200; 2015_22-SAG-OC_EEHC-L-00226 2015_22_EEHC_SAG-OC-L-00093; 2015_22-SAG-OC_EEHC-L-00202; 2015_22-SAG-OC_EEHC-L-00204 2015_22-SAG-EEHC-L-00328; 2015_22-SAG-OC_EEHC-L-00214 2015_22-SAG-OC_EEHC-L-00142; 2015_22-SAG-OC_EEHC-L-00151 2015_22-SAG-OC_EEHC-L-00162; 2015_22-SAG-OC_EEHC-L-00196; 2015_22-SAG-OC_EEHC-L-00203; 2015_22-SAG-OC_EEHC-L-00206 2015_22-SAG-OC_EEHC-L-00218 2015_22_EEHC_SAG-OC-L-00163; 2015_22_EEHC_SAG-OC-L-00181; 2015_22_EEHC_SAG-OC-L-00188; 2015_22_EEHC_SAG-OC-L-00197; 2015_22-SAG-OC_EEHC-L-00162; 2015_22-SAG-OC_EEHC-L-00209; 2015_22-SAG-OC_EEHC-L-00216; 2015_22-SAG-OC-L-00201 2015_22-SAG-OC_EEHC-L-00195; 2015_22-SAG-OC_EEHC-L-00208 2015_22_EEHC_SAG-OC-L-00093; 2015_22_EEHC_SAG-OC-L-00198; 2015_22-SAG-OC_EEHC-L-00193; 2015_22-SAG-OC_EEHC-L-00204; 2015_22-SAG-OC_EEHC-L-00217; 2015_22-SAG-OC_EEHC-L-00227
Page 5 of 6
Project: EG1019 MPR No.: 23
Correspondence List (Customer to Consortium)
SIEMENS Letter-No.(int.)
Letter-No.(ext.)
Subject
Reply Req. Corr. Date
Target Date
2015_22-OC_EEHC-SAG-L-00206
2015_22_EEHC_SAG-OC-L-00206
2015_22-EEHC_SAG-OC-L-00206 Minutes of Meeting 16August 2016
Yes
23.09.2016
03.10.2016
Completed
2015_22-OC_EEHC-SAG-L-00207 2015_22-OC_EEHC-SAG-L-00208
2015_22_EEHC_SAG-OC-L-00207 2015_22_EEHC_SAG-OC-L-00208
Yes Yes
25.09.2016 27.09.2016
03.10.2016 05.10.2016
Completed Completed
2015_22-OC_EEHC-SAG-L-00209
2015_22_EEHC_SAG-OC-L-00209
2015_22-EEHC_SAG-OC-L-00207 Offshore Mines Scan 2015_22-EEHC_SAG-OC-L-00208 Collective Notes (2) 2015_22-EEHC_SAG-OC-L-00209 Height Restriction for Crossing Underneath of Energized 500kV Overhead Transmission Line (OHTL)
Reference to 2015_22-SAG-OC_EEHC-L-00211; 2015_22-SAG-OC_EEHC-L-00228 2015_22-SAG-OC_EEHC-L-00205; 2015_22-SAG-OC_EEHC-L-00207 2015_22-SAG-OC_EEHC-L-00259
Yes
02.10.2016
11.10.2016
Completed
2015_22-SAG-OC_EEHC-L-00219
2015_22-OC_EEHC-SAG-L-00210
2015_22_EEHC_SAG-OC-L-00210
2015_22-EEHC_SAG-OC-L-00210 Gas pipe line trench in the Gas Reducing Station
Yes
09.10.2016
17.10.2016
Completed
2015_22-OC_EEHC-SAG-L-00211 2015_22-OC_EEHC-SAG-L-00212
2015_22_EEHC_SAG-OC-L-00211 2015_22_EEHC_SAG-OC-L-00212
2015_22-EEHC_SAG-OC-L-00211 Electrical Works Offer for GRS 2015_22-EEHC_SAG-OC-L-00212 Damage of 500kV Cable
Yes Yes
10.10.2016 19.10.2016
18.10.2016 28.10.2016
Completed Completed
2015_22-SAG-OC_EEHC-L-00231 2015_22-SAG-OC_EEHC-L-00217; 2015_22-SAG-OC_EEHC-L-00228; 2015_22-SAG-OC_EEHC-L-00243 2015_22-SAG-OC_EEHC-L-00242
2015_22-OC_EEHC-SAG-L-00213
2015_22_EEHC_SAG-OC-L-00213
2015_22-EEHC_SAG-OC-L-00213 Readiness of the 500 KV Abu Quir/ Badr Circuit
Yes
22.10.2016
31.10.2016
Completed
2015_22-OC_EEHC-SAG-L-00214
2015_22_EEHC_SAG-OC-L-00214
2015_22-EEHC_SAG-OC-L-00214 Date of Back Energization
Yes
23.10.2016
01.11.2016
Completed
2015_22-OC_EEHC-SAG-L-00215 2015_22-OC_EEHC-SAG-L-00216 2015_22-OC_EEHC-SAG-L-00217
2015_22_EEHC_SAG-OC-L-00215 2015_22_EEHC_SAG-OC-L-00216 2015_22_EEHC_SAG-OC-L-00217
2015_22-EEHC_SAG-OC-L-00215 Failure of HI-POT Test on MV Cable 2015_22- EEHC_SAG-OC-L-00216 Back Energization Date 2015_22- EEHC_SAG-OC-L-00217 Commissioning Procedures and Schedule
Yes Yes Yes
29.10.2016 31.10.2016 06.11.2016
08.11.2016 07.11.2016 14.11.2016
Completed Completed Completed
2015_22-OC_EEHC-SAG-L-00218
2015_22_EEHC_SAG-OC-L-00218
2015_22- EEHC_SAG -OC-L-00218 Re Electrical Works Offer for GRS
Yes
06.11.2016
14.11.2016
Completed
2015_22-OC_EEHC-SAG-L-00219
2015_22_EEHC_SAG-OC-L-00219
12.11.2016
21.11.2016
Completed
2015_22_EEHC_SAG-OC-L-00220
2015_22- EEHC_SAG -OC-L-00219 On-Site Tests for MV Cables 2015_22- EEHC_SAG -OC-L-00220 Mine Clearance Certificate for On-Shore Portion of Works
Yes
2015_22-OC_EEHC-SAG-L-00220
Yes
19.11.2016
28.11.2016
Completed
2015_22-OC_EEHC-SAG-L-00221 2015_22-OC_EEHC-SAG-L-00222 2015_22-OC_EEHC-SAG-L-00223 2015_22-OC_EEHC-SAG-L-00224
2015_22_EEHC_SAG-OC-L-00221 2015_22_EEHC_SAG-OC-L-00222 2015_22_EEHC_SAG-OC-L-00223 2015_22_EEHC_SAG-OC-L-00224
Yes No Yes Yes
19.11.2016 01.12.2016 04.12.2016 11.12.2016
28.11.2016 12.12.2016 19.12.2016
Completed Completed Completed Completed
2015_22-OC_EEHC-SAG-L-00225
2015_22_EEHC_SAG-OC-L-00225
2015_22- EEHC_SAG -OC-L-00221 Project Landscape 2015_22- EEHC_SAG -OC-L-00222 Re Natural Gas Analysis EG1019 CON 2015_22-EEHC_SAG-OC-L-00223 Workers in Burullus Project EG1019 CON 2015_22-EEHC_SAG-OC-L-00224 Collective notices (2) 2015_22- EEHC_SAG -OC-L-00225 Time Schedule for First Fire and First power to grid of Units
Yes
12.12.2016
19.12.2016
Completed
2015_22-OC_EEHC-SAG-L-00226
2015_22_EEHC_SAG-OC-L-00226
2015_22- EEHC_SAG -OC-L-00226 Re: Time Schedule for Synchronization of Units
Yes
21.12.2016
28.12.2016
Completed
2015_22-OC_EEHC-SAG-L-00227 2015_22-OC_EEHC-SAG-L-00228 2015_22-OC_EEHC-SAG-L-00229
2015_22_EEHC_SAG-OC-L-00227 2015_22_EEHC_SAG-OC-L-00228 2015_22_EEHC_SAG-OC-L-00229
Yes Yes Yes
26.12.2016 26.12.2016 26.12.2016
03.01.2017 03.01.2017 03.01.2017
Completed Completed Completed
2015_22-OC_EEHC-SAG-L-00230
2015_22_EEHC_SAG-OC-L-00230
Yes
30.12.2016
06.01.2017
Completed
2015_22-OC_EEHC-SAG-L-00231 2015_22-OC_EEHC-SAG-L-00232
2015_22_EEHC_SAG-OC-L-00231 2015_22_EEHC_SAG-OC-L-00232
2015_22- EEHC_SAG -OC-L-00227 Trip Event of the Main Transformer BAT41 2015_22- EEHC_SAG -OC-L-00228 Trip Event of Abu Quir - Burullus Circuit 2015_22- EEHC_SAG -OC-L-00229 Off- Shore Mine Scan. 2015_22- EEHC_SAG -OC-L-00230 Re: Time Schedule for First Fire and First Power to grid of Units 42,41,32,and 31 open cycle (2) 2015_22- EEHC_SAG-OC-L-00231 Delay in Accelerated Project Time Schedule for Units 41, 32, and 31 2015_22- EEHC_SAG-OC-L-00232 Damage in Main Transformer 41BAT
Yes Yes
01.01.2017 03.01.2017
09.01.2017 10.01.2017
Completed Completed
2015_22-OC_EEHC-SAG-L-00233 2015_22-OC_EEHC-SAG-L-00234
2015_22_EEHC_SAG-OC-L-00233 2015_22_EEHC_SAG-OC-L-00234
2015_22- EEHC_SAG-OC-L-00233 RE: 41BAT01 Trip Event Inspection Report 2015_22-EEHC_SAG-OC-L-00234 Trip Event of Main Transformer BAT41
Yes Yes
07.01.2017 14.01.2017
16.01.2017 19.01.2017
Completed Completed
2015_22-OC_EEHC-SAG-L-00235
2015_22_EEHC_SAG-OC-L-00235
16.01.2017
24.01.2017
Completed
2015_22_EEHC_SAG-OC-L-00236 2015_22_EEHC_SAG-OC-L-00237
Yes Yes
04.02.2017 12.02.2017
13.02.2017 20.02.2017
Completed Completed
2015_22-OC_EEHC-SAG-L-00238
2015_22_EEHC_SAG-OC-L-00238
2015_22- EEHC_SAG -OC-L-00235 Workers in Burullus Project (2) 2015_22- EEHC_SAG-OC-L-00236 Re: Request to send a Letter to the Ministry of Transportation- Maritime Transport Sector (MTS) 2015_22- EEHC_SAG -OC-L-00237 Failures in Gas Compressor Systems 2015_22- EEHC_SAG -OC-L-00238 Request to send a Letter to Ministry of Transportation - Maritime Transport Sector (MTS)
Yes
2015_22-OC_EEHC-SAG-L-00236 2015_22-OC_EEHC-SAG-L-00237
2015_22-SAG-OC_EEHC-L-00279; 2015_22-SAG-OC_EEHC-L-00282 2015_22-SAG-OC_EEHC-L-00280 2015_22_EEHC_SAG-OC-L-00223; 2015_22-SAG-OC_EEHC-L-00266 2015_22_EEHC_SAG-OC-L-00238; 2015_22-SAG-OC_EEHC-L-00283 2015_22-SAG-OC_EEHC-L-00295
No
19.02.2017
Completed
2015_22-SAG-OC_EEHC-L-00285
10.08.2017
Due
Status
2015_22-SSM-OCSM_EEHC-L-00005 2015_22_EEHC_SAG-OC-L-00213; 2015_22-SSM-OCSM_EEHC-L-00006 2015_22-SAG-OC_EEHC-L-00255; 2015_22-SAG-OC_EEHC-L-00305 2015_22-SAG-EEHC-L-00349 2015_22-SAG-EEHC-L-00357 2015_22_EEHC_SAG-OC-L-00211; 2015_22-SAG-OC_EEHC-L-00193; 2015_22-SAG-OC_EEHC-L-00217; 2015_22-SAG-OC_EEHC-L-00228; 2015_22-SAG-OC_EEHC-L-00243; 2015_22-SAG-OC_EEHC-L-00245; 2015_22-SAG-OC_EEHC-L-00253 2015_22-SAG-OC_EEHC-L-00255; 2015_22-SAG-OC_EEHC-L-00258; 2015_22-SAG-OC_EEHC-L-00305 2015_22-SAG-OC_EEHC-L-00248 2015_22-OC_EEHC-L-00273; 2015_22OC_EEHC-L-00277 2015_22-SAG-OC_EEHC-L-00260 2015_22-SAG-OC_EEHC-L-00266 2015_22-SAG-OC_EEHC-L-00275 2015_22-SAG-OC_EEHC-L-00276 2015_22_EEHC_SAG-OC-L-00225; 2015_22-SAG-OC_EEHC-L-00276 2015_22-SAG-OC_EEHC-E-00001; 2015_22-SAG-OC_EEHC-L-00277; 2015_22-SAG-OC_EEHC-L-00282 2015_22-SAG-OC_EEHC-L-00270
2015_22-SAG-OC_EEHC-L-00278 2015_22_EEHC_SAG-OC-L-00230; 2015_22-SAG-OC_EEHC-L-00278
Page 6 of 6
Letter-No.(int.) 2015_22-SAG-OH_EEHC-L-00004 2015_22-SAG-OH_EEHC-L-00007 2015_22-SAG-OC_EEHC-L-00008 2015_22-SAG-OH_EEHC-L-00010 2015_22-SAG-OH_EEHC-L-00012 2015_22-SAG-OH_EEHC-L-00015 2015_22-SAG-OC_EEHC-L-00016 2015_22-SAG-OH_EEHC-L-00013 2015_22-SAG-OH_EEHC-L-00014 2015_22-SAG-OH_EEHC-L-00017 2015_22-SAG-OH_EEHC-L-00018 2015_22-SAG-OH_EEHC-L-00023 2015_22-SAG-OH_EEHC-L-00024 2015_22-SAG-OH_EEHC-L-00025 2015_22-SAG-OH_EEHC-L-00027 2015_22-SAG-OC_EEHC-L-00028 2015_22-SAG-OH_EEHC-L-00026 2015_22-SAG-OC_EEHC-L-00030 2015_22-SAG-OC_EEHC-L-00031 2015_22-SAG-OC_EEHC-L-00032 2015_22-SAG-OC_EEHC-L-00033 2015_22-SAG-OC_EEHC-L-00034 2015_22-SAG-OC_EEHC-L-00035 2015_22-SAG-OC_EEHC-L-00036
Project: EG1019
Correspondence List (consortium to Customer)
SIEMENS Letter-No.(ext.)
Subject Advance payment and performance letters of guarantee GIS Building Skeleton
Reply Req. Corr. Date Yes 03.08.2015 Yes 17.08.2015
Target Date 17.08.2015 31.08.2015
Status Completed Completed
EG1019 CON 2015_22-SAG-OH_EEHC-L-00008 Formal Taking Over of Site and Confirmation of Coordinates Issuance of the Environmental and Social Impact Assessment (ESIA) Report Formal Taking Over of Site and Confirmation of Coordinates Outstanding Environmental and Social Impact Assessment for projects Burullus and New Capital EG1019 CON 2015_22-SAG-OH_EEHC-L-00016 Areas for Laydown, Site Offices and Camp Resume Site Activities and Stoppage of the Works Army service road at site Owner representative at site Change of Location of GIS Building Site Handover/ Layout Change Project’s Construction Water Change of Location of GIS Building / Site Handover Project Reference Number at AFOA for Permit Applications for Burullus Fisher Port Access and Egress to Power Plant - Existing Highway Technical Data for Fuel Oil Forwarding Pumps Permit Applications for Burullus Fisher Port Correspondence Procedure Monthly Progress Report No. 1 Civil Works RE: Temporary Construction Power RE_ Boring Study Report and Topographic Survey Report RE_Project’s Construction Water
Yes Yes Yes Yes Yes No No No No Yes Yes Yes Yes Yes No Yes Yes No No No No No
30.08.2015 30.08.2015 09.09.2015 05.09.2015 18.09.2015
Sent Completed Completed Sent Sent Completed Completed Completed Completed Sent Completed Sent Completed Sent Completed Sent Completed Completed Completed Completed Completed Completed
24.08.2015 24.08.2015 02.09.2015 03.09.2015 04.09.2015 06.09.2015 06.09.2015 06.09.2015 12.09.2015 18.09.2015 21.09.2015 23.09.2015 25.09.2015 01.10.2015 02.10.2015 06.10.2015 06.10.2015 08.10.2015 09.10.2015 09.10.2015 12.10.2015 12.10.2015
02.10.2015 28.10.2015 06.10.2015 02.10.2015 08.10.2015 09.10.2015 14.10.2015
2015_22-SAG-OC_EEHC-L-00038 2015_22-SAG-OC_EEHC-L-00039 2015_22-SAG-OC_EEHC-L-00041 2015_22-SAG-OC_EEHC-L-00043 2015_22-SAG-OC_EEHC-L-00042
Re: Access and Egress to Power Plant – Existing Highway Monthly progress meeting 29. October 2015 Compensation for Lost Laydown Areas Interfaces to fuel oil system Dust Control and Chance Find Management Plans
No Yes No No No
15.10.2015 16.10.2015 21.10.2015 21.10.2015 26.10.2015
2015_22-SAG-OC_EEHC-L-00029 2015_22-SAG-OC_EEHC-L-00044 2015_22-SAG-OC_EEHC-L-00046 2015_22-SAG-OC_EEHC-L-00047
Layout Change Contractor temporary measures regarding Project’s Construction Water Notice of Force Majeure Event 11kV Commissionig Power
No No No No
27.10.2015 27.10.2015 27.10.2015 29.10.2015
Completed Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00048 2015_22-SAG-OC_EEHC-L-00050 2015_22-SAG-OC_EEHC-L-00051 2015_22-SAG-OC_EEHC-L-00054 2015_22-SAG-OC_EEHC-L-00055 2015_22-SAG-OC_EEHC-L-00049 2015_22-SAG-OC_EEHC-L-00053 2015_22-SAG-OC_EEHC-L-00057 2015_22-SAG-OC_EEHC-L-00059 2015_22-SAG-OC_EEHC-L-00058
No No No No No Yes No Yes Yes No
29.10.2015 05.11.2015 10.11.2015 11.11.2015 11.11.2015 12.11.2015 12.11.2015 12.11.2015 13.11.2015 16.11.2015
Completed Completed Completed Completed Completed Sent Completed Sent Completed Completed
2015_22-SAG-OC_EEHC-L-00060 2015_22-SAG-OC_EEHC-L-00061
Access and Egress to Power Plant - Proposed Design Traffic Management Plan - Input for ESAP Project Colour Concept Monthly Progress Report No. 2 Notice of Force Majeure Site Handover Re: Load List for Auxiliaries for all units 2015_22-SAG-OC_EEHC-L-00057 500 kv GIS Substation Switchgear & Control Start Date after lapse of 6 months Document Transmittals Monthly Progress Meeting - Request for provision of commercial and technical offer for Fuel Oil Handling System upstream defined 2nd Monthly Progress Meeting - Minutes of Meeting
No No
17.11.2015 18.11.2015
Completed Completed
2015_22-SAG-OC_EEHC-L-00062 2015_22-SAG-OC_EEHC-L-00065 2015_22-SAG-OC_EEHC-L-00066
Layout Change Driven Piles - Steel Pipes Document transmittals
No No No
19.11.2015 24.11.2015 24.11.2015
Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00068
500 kV switchgear, OHL feeder rating, receiving gantry
Yes
26.11.2015
10.12.2015
Sent
2015_22-SAG-OC_EEHC-L-00072 2015_22-SAG-OC_EEHC-L-00073 2015_22-SAG-OC_EEHC-L-00071
2015_22-SAG-OC_EEHC-L-00072 Change in rating from 2000 A to 3150 A for the overhead line Hydrogen generation plant - requirements for H2 cooled generators Monthly Progress Report No. 3
Yes No No
07.12.2015 07.12.2015 10.12.2015
14.12.2015
Sent Completed Completed
10.08.2017
23.10.2015
19.11.2015 19.11.2015 20.11.2015
Completed Sent Completed Completed Completed
Reference to 2015_22-SAG-OC_MDEPC-L-00001
2015_22-SAG-OH_EEHC-L-00015 2015_22-SAG-OH_EEHC-L-00010
2015_22_EEHC_SAG-OC-L-00004 2015_22-SAG-OC_EEHC-L-00080
2015_22-SAG-OC_EEHC-L-00047
2015_22_EEHC_SAG-OC-L-00017; 2015_22-SAG-OC_EEHC-L-00048; 2015_22-SAG-OC_EEHC-L-00080
2015_22_EEHC_SAG-OC-L-00022 2015_22_EEHC_SAG-OC-L-00004; 2015_22_EEHC_SAG-OC-L-00015
2015_22-SAG-OC_EEHC-L-00034 2015_22-SAG-OC_EEHC-L-00038; 2015_22-SAG-OC_EEHC-L-00050; 2015_22-SAG-OC_EEHC-L-00080 2015_22-SAG-OC_EEHC-L-00048
2015_22_EEHC_SAG-OC-L-00029 2015_22-EEHC-SAG-L-00014 2015_22-EEHC-SAG-E-00015
2015_22_EEHC_SAG-OC-E-00023; 2015_22-SAG-OC_EEHC-L-00091 2015_22-SAG-OC_EEHC-L-00091 2015_22_EEHC_SAG-OC-L-00039 2015_22-EEHC-SAG-E-00015; 2015_22-SAG-EEHC-L-00374 2015_22_EEHC_SAG-OC-L-00040; 2015_22-SAG-EEHC-L-00374 2015_22-SAG-OC_EEHC-L-00091
Page 1 of 5
Letter-No.(int.)
Project: EG1019
Correspondence List (consortium to Customer)
SIEMENS Subject
Reply Req. Corr. Date
Target Date
Status
2015_22-SAG-OC_EEHC-L-00069 2015_22-SAG-OC_EEHC-L-00075 2015_22-SAG-OC_EEHC-L-00079
RE: Load List for Auxiliaries Detailing scope for H2 generation plant Baseline Program
No Yes No
22.12.2015 22.12.2015 10.01.2016
04.01.2016
Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00080 2015_22-SAG-OC_EEHC-L-00082 2015_22-SAG-OC_EEHC-L-00083 2015_22-SAG-OC_EEHC-L-00081 2015_22-SAG-OC_EEHC-L-00088 2015_22-SAG-OC_EEHC-L-00089
2015_22-SAG-OC_EEHC-L-00080 Meeting with Traffic Authority MOM Notice of Force Majeure 2015_22-SAG-OC_EEHC-L-00083 RE Raised floor for central buildings Monthly Progress Report No. 4 Re Floor and Wall Tiles Re Raised Floor for Central Buildings
No No No No No No
12.01.2016 14.01.2016 14.01.2016 15.01.2016 21.01.2016 21.01.2016
Completed Completed Completed Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00090 2015_22-SAG-OC_EEHC-L-00078
Preliminary Incident Report R1 4th Monthly Progress Meeting - Minutes of Meeting
No No
26.01.2016 01.02.2016
Completed Completed
2015_22-SAG-OC_EEHC-L-00091 2015_22-SAG-OC_EEHC-L-00094 2015_22-SAG-OC_EEHC-L-00096
2015_22-SAG-OC_EEHC-L-00101 2015_22-SAG-OC_EEHC-L-00097 2015_22-SAG-OC_EEHC-L-00102 2015_22-SAG-OC_EEHC-L-00098 2015_22-SAG-OC_EEHC-L-00100 2015_22-SAG-OC_EEHC-L-00105 2015_22-SAG-OC_EEHC-L-00109 2015_22-SAG-OC_EEHC-L-00110
Letter-No.(ext.)
2015_22-SAG-OC_EEHC-L-00091 Re Gas Reducing Station Notice of Force Majeure Petrojet Safety Hazards
RE Force Majeure Monthly Progress Report No. 5 Environmental, Health and Safety (EHS) Manual Project Management Plan Site HSE Procedures Requirements for Radiography Notice of Force Majeure ESAP item 31, Workers Accomodation
No No No
No No Yes No No No Yes No
02.02.2016 02.02.2016 04.02.2016
09.02.2016 10.02.2016 11.02.2016 15.02.2016 15.02.2016 15.02.2016 19.02.2016 23.02.2016
Completed Completed Completed
18.02.2016
26.02.2016
Completed Completed Sent Completed Completed Completed Sent Completed
2015_22-SAG-OC_EEHC-L-00108 2015_22-SAG-OC_EEHC-L-00111 2015_22-SAG-OC_EEHC-L-00113 2015_22-SAG-OC_EEHC-L-00114 2015_22-SAG-OC_EEHC-L-00115 2015_22-SAG-OC_EEHC-L-00116
Final Incident Report Notice of Force Majeure Final report Groundwater Sustainability and Impact Assessment Weekly Consortium EHS Meeting on Site Notification of accident on site Re Radiography documents of Petrojet-GASCO
No No No No No No
24.02.2016 24.02.2016 24.02.2016 24.02.2016 25.02.2016 25.02.2016
Completed Completed Completed Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00117
Re Incident Report Rev 1
No
29.02.2016
Completed
2015_22-SAG-OC_EEHC-L-00118 2015_22-SAG-OC_EEHC-L-00120
RE Force Majeure Notice of Force Majeure
No No
01.03.2016 03.03.2016
Completed Completed
2015_22-SAG-OC_EEHC-L-00121 2015_22-SAG-OC_EEHC-L-00122 2015_22-SAG-OC_EEHC-L-00124
Work Permit for Foreign Manpower Final Incident Report – Crane Accident Monthly Progress Report No. 6 Part1/2
No No No
07.03.2016 07.03.2016 10.03.2016
Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00125 2015_22-SAG-OC_EEHC-L-00126 2015_22-SAG-OC_EEHC-L-00127 2015_22-SAG-OC_EEHC-L-00128
10.08.2017
Reply to EHS letters from Owner RE Corrective Measures of EHS Submission of Insurance Policy No. 16 100 20010 00935 Reply to Owner's EHS letter 4
No No No No
10.03.2016 10.03.2016 11.03.2016 14.03.2016
Completed Completed Completed Completed
Reference to 2015_22_EEHC_SAG-OC-L-00036; 2015_22-SAG-OC_EEHC-L-00091 2015_22_EEHC_SAG-OC-L-00055 2015_22-SAG-OC_EEHC-L-00091 2015_22-SAG-OC_EEHC-L-00028; 2015_22-SAG-OC_EEHC-L-00038; 2015_22-SAG-OC_EEHC-L-00048 2015_22_EEHC_SAG-OC-L-00071 2015_22_EEHC_SAG-OC-L-00073 2015_22_EEHC_SAG-OC-L-00078 2015_22_EEHC_SAG-OC-L-00080; 2015_22-SAG-OC_EEHC-L-00108 2015_22_EEHC_SAG-OC-L-00061; 2015_22_EEHC_SAG-OC-L-00063; 2015_22_EEHC_SAG-OC-L-00064; 2015_22_EEHC_SAG-OC-L-00069; 2015_22_EEHC_SAG-OC-L-00074; 2015_22_EEHC_SAG-OC-L-00077; 2015_22_EEHC_SAG-OC-L-00081; 2015_22-SAG-OC_EEHC-L-00062; 2015_22-SAG-OC_EEHC-L-00065; 2015_22-SAG-OC_EEHC-L-00069; 2015_22-SAG-OC_EEHC-L-00071; 2015_22-SAG-OC_EEHC-L-00079 2015_22-SAG-OC_EEHC-L-00101 2015_22_EEHC_SAG-OC-L-00090; 2015_22-SAG-OC_EEHC-L-00094; 2015_22-SAG-OC_EEHC-L-00118 2015_22-SAG-OC_EEHC-L-00100 2015_22-SAG-OC_EEHC-L-00102 2015_22-SAG-OC_EEHC-L-00116
2015_22_EEHC_SAG-OC-L-00086; 2015_22-SAG-OC_EEHC-L-00090; 2015_22-SAG-OC_EEHC-L-00117
2015_22-SAG-OC_EEHC-L-00105 2015_22_EEHC_SAG-OC-L-00083; 2015_22-SAG-OC_EEHC-L-00108 2015_22_EEHC_SAG-OC-L-00103; 2015_22-SAG-OC_EEHC-L-00101 2015_22_EEHC_SAG-OC-L-00059; 2015_22-SAG-OC_EEHC-L-00140
2015_22_EEHC_SAG-OC-L-00094; 2015_22_EEHC_SAG-OC-L-00095; 2015_22_EEHC_SAG-OC-L-00106
2015_22_EEHC_SAG-OC-L-00114
Page 2 of 5
Letter-No.(int.) 2015_22-SAG-OC_EEHC-L-00129
Project: EG1019
Correspondence List (consortium to Customer)
SIEMENS Letter-No.(ext.)
Subject Gas Reducing Station - Petrojet Works
Reply Req. Corr. Date No 14.03.2016
Target Date
Status Completed
2015_22-SAG-OC_EEHC-L-00119 2015_22-SAG-OC_EEHC-L-00130 2015_22-SAG-OC_EEHC-L-00131 2015_22-SAG-OC_EEHC-L-00132
Gas Reducing Station U- Turns on the International Coast Road Notice of Force Majeure Notification of Serious Incident
Yes No No No
15.03.2016 15.03.2016 15.03.2016 17.03.2016
21.03.2016
Completed Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00134
RE Weather Conditions
No
29.03.2016
2015_22-SAG-OC_EEHC-L-00135
RESEND: 2015_22-SAG-OC_EEHC-L-00135 Supplement of the Contract Color Scheme of the Power Plant Rev C
Yes
31.03.2016
05.04.2016
Sent
2015_22-SAG-OC_EEHC-L-00123 2015_22-SAG-OC_EEHC-L-00133 2015_22-SAG-OC_EEHC-L-00138 2015_22-SAG-OC_EEHC-L-00139
RESEND: 2015_22-SAG-OC_EEHC-L-00123 Factory Inspection Test Reminder of U- Turns on the International Coast Road 2015_22-SAG-OC_EEHC-L-00138 Contractor’s Environmental, Health and Safety (EHS) Manual Rev C Monthly Progress Report No.7
Yes No Yes No
03.04.2016 04.04.2016 04.04.2016 07.04.2016
09.04.2016
Sent Completed Sent Completed
2015_22-SAG-OC_EEHC-L-00140 2015_22-SAG-OC_EEHC-L-00141 2015_22-SAG-OC_EEHC-L-00142 2015_22-SAG-OC_EEHC-L-00143 2015_22-SAG-OC_EEHC-L-00144 2015_22-SAG-OC_EEHC-L-00150 2015_22-SAG-OC_EEHC-L-00152 2015_22-SAG-OC_EEHC-L-00151 2015_22-SAG-OC_EEHC-L-00153
No No Yes No No No No No No
07.04.2016 11.04.2016 11.04.2016 11.04.2016 19.04.2016 22.04.2016 28.04.2016 29.04.2016 29.04.2016
2015_22-SAG-OC_EEHC-L-00155 2015_22-SAG-OC_EEHC-L-00156 2015_22-SAG-OC_EEHC-L-00157
Work Permit for Foreign Manpower Reminder Gas Reduction Station - Petrojet works. Factory Inspection Test Final Incident Report - Failure of non structural negative shutter wall Notice of Force Majeure Site Preparation Agreement Quantities Aviation warning light system for main and bypass stack Factory Inspection Test 2015_22-SAG-OC_EEHC-L-00153 Milestones Payment Schedule for Orascom Construction Scope Crossing of Heavy Shipments underneath the section of High-voltage Overhead Transmission Line (OHTL) running across the Site. Intake and Discharge Structures - AFOA approval on temporary works Monthly Progress Report No.8 Part1/2
Yes Yes No
11.05.2016 12.05.2016 15.05.2016
2015_22-SAG-OC_EEHC-L-00158 2015_22-SAG-OC_EEHC-L-00159 2015_22-SAG-OC_EEHC-L-00161
Re: Crossing of Heavy Shipments underneath the section of High- voltage Overhead Transmission Line (OHTL) running across the Site Notice of Force Majeure Burullus: EEHC Letter ref. (2015_22-SAG-OC_EEHC-L-00161) –"Fatality on Site"
Yes No No
19.05.2016 25.05.2016 31.05.2016
2015_22-SAG-OC_EEHC-L-00162 2015_22-SAG-OC_EEHC-L-00180 2015_22-SAG-OC_EEHC-L-00181 2015_22-SAG-OC_EEHC-L-00163 2015_22-SAG-OC_EEHC-L-00164 2015_22-SAG-OC_EEHC-L-00170 2015_22-SAG-OC_EEHC-L-00173 2015_22-SAG-OC_EEHC-L-00168 2015_22-SAG-OC_EEHC-L-00171 2015_22-SAG-OC_EEHC-L-00165
Site Preparation Agreement Increase of Quantities Interim Assessment Re Corrective Measures of Safety Procedures on Site Re EHS 6 Re Burullus-Samanoud 500 KV OHTL Tower drm Site Preperation Agreement Completion date. Monthly Progress Report No.9 Re EHS 5 Re Invoice documentation Re: Data for supplied pumps Final Incident Report - Lifting Failure on Module 3
No Yes No Yes Yes No No No No No
02.06.2016 02.06.2016 03.06.2016 06.06.2016 09.06.2016 10.06.2016 13.06.2016 20.06.2016 20.06.2016 21.06.2016
2015_22-SAG-OC_EEHC-L-00174
Re Burullus/Samanoud 500 KV OHTL Tower
Yes
22.06.2016
2015_22-SAG-OC_EEHC-L-00175 2015_22-SAG-OC_EEHC-L-00166 2015_22-SAG-OC_EEHC-L-00167 2015_22-SAG-OC_EEHC-L-00172 2015_22-SAG-OC_EEHC-L-00185
Gantry construction required for the 500kV Burullus/ Samanoid Transmission line Re Shore Protection Approval on Intake an Discharge Structures Re Support for the Contractor´s RO Plant Operation Rescheduling of Monthly Progress Report No. 10 Draft Workforce Code of Conduct and the Commitment
No Yes Yes No No
22.06.2016 28.06.2016 28.06.2016 28.06.2016 04.07.2016
2015_22-SAG-OC_EEHC-L-00169 2015_22-SAG-OC_EEHC-L-00176 2015_22-SAG-OC_EEHC-L-00177 2015_22-SAG-OC_EEHC-L-00178 2015_22-SAG-OC_EEHC-L-00179 2015_22-SAG-OC_EEHC-L-00076
Site Preparation Agreement Quantities Water Quality of the Site 2015_22-SAG-OC_EEHC-L-00177 Re Delays in Project Time Reminder - Shore Protection Approval on Intake and Discharge Structures Re Schedule of GIS works Social Insurance Authority Notification
No Yes Yes Yes No Yes
13.07.2016 15.07.2016 15.07.2016 15.07.2016 15.07.2016 18.07.2016
10.08.2017
Completed
09.04.2016
18.04.2016
12.05.2016 17.05.2016
26.05.2016
10.06.2016 13.06.2016 16.06.2016
29.06.2016
05.07.2016 05.07.2016
22.07.2016 22.07.2016 22.07.2016 25.07.2016
Completed Completed Sent Completed Completed Completed Completed Completed Completed Sent Sent Completed
Completed Completed Completed
Completed Sent Completed Sent Sent Completed Completed Completed Completed Completed Sent Completed Sent Sent Completed Completed Completed Sent Sent Sent Completed Sent
Reference to 2015_22_EEHC_SAG-OC-L-00091; 2015_22_EEHC_SAG-OC-L-00093 2015_22-SAG-OC_EEHC-L-00133 2015_22-SAG-OC_EEHC-L-00134 2015_22_EEHC_SAG-OC-L-00122; 2015_22-SAG-OC_EEHC-L-00131 2015_22-OC-SAG-L-00095 2015_22-SAG-EEHC-L-00206; 2015_22-SAG-OC_EEHC-L-00142 2015_22-SAG-OC_EEHC-L-00130
2015_22_EEHC_SAG-OC-L-00059; 2015_22-SAG-OC_EEHC-L-00121 2015_22-SAG-OC_EEHC-L-00123
2015_22-SAG-EEHC-L-00218 2015_22_EEHC_SAG-OC-L-00142
2015_22-SAG-OC_EEHC-L-00182 2015_22_EEHC_SAG-OC-L-00155; 2015_22-SAG-OC_EEHC-L-00219; 2015_22-SAG-OC_EEHC-L-00244
2015_22-SAG-OC_EEHC-L-00164; 2015_22-SAG-OC_EEHC-L-00169; 2015_22-SAG-OC_EEHC-L-00194 2015_22_EEHC_SAG-OC-L-00171 2015_22_EEHC_SAG-OC-L-00172 2015_22_EEHC_SAG-OC-L-00173 2015_22-SAG-OC_EEHC-L-00162 2015_22_EEHC_SAG-OC-L-00150 2015_22_EEHC_SAG-OC-L-00182 2015_22_EEHC_SAG-OC-L-00183 2015_22_EEHC_SAG-OC-L-00173; 2015_22-SAG-OC_EEHC-L-00210 2015_22-EEHC-SAG-L-00070; 2015_22-EEHC-SAG-L-00072 2015_22_EEHC_SAG-OC-L-00176 2015_22_EEHC_SAG-OC-L-00184
2015_22_EEHC_SAG-OC-L-00181; 2015_22-SAG-OC_EEHC-L-00162 2015_22_EEHC_SAG-OC-L-00163 2015_22-SAG-EEHC-L-00268
Page 3 of 5
Letter-No.(int.)
Project: EG1019
Correspondence List (consortium to Customer)
SIEMENS Letter-No.(ext.)
Subject
Reply Req. Corr. Date
Target Date
Status
2015_22-SAG-OC_EEHC-L-00182 2015_22-SAG-OC_EEHC-L-00186 2015_22-SAG-OC_EEHC-L-00191 2015_22-SAG-OC_EEHC-L-00187 2015_22-SAG-OC_EEHC-L-00193 2015_22-SAG-OC_EEHC-L-00194 2015_22-SAG-OC_EEHC-L-00195
Reminder - AFOA Approval for permenant and temporarary Works 500kV Grid Monthly Progress Report No. 10 2015_22-SAG-OC_EEHC-L-00187 Environmental Monitoring Stations – Additional works Offer for extra works at the gas reducing station Re EEHC letter ref. 1327 - SPA Quantities Re Invoice Documentation
Yes No No Yes No No No
18.07.2016 18.07.2016 18.07.2016 21.07.2016 28.07.2016 02.08.2016 02.08.2016
25.07.2016
Sent Completed Completed Sent Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00196 2015_22-SAG-OC_EEHC-L-00198 2015_22-SAG-OC_EEHC-L-00197 2015_22-SAG-OC_EEHC-L-00199 2015_22-SAG-OC_EEHC-L-00200
Request for AFOA approval for intake pipelines and intake heads permanent works EHS Manual Rev D Updated Traffic Management Plan RESEND - Notice of Force Majeure Re Delays in Project Time
No No Yes No No
02.08.2016 03.08.2016 04.08.2016 05.08.2016 05.08.2016
2015_22-SAG-OC_EEHC-L-00203
2015_22-SAG-OC_EEHC-L-00203 Offshore Works’ Permits
No
05.08.2016
2015_22-SAG-OC_EEHC-L-00207 2015_22-SAG-OC_EEHC-L-00211
Re Offshore Mines Scan Agenda for meeting regarding construction of Gas Reducing Station by Owner/GASCO
Yes Yes
05.08.2016 07.08.2016
28.07.2016
11.08.2016
Completed Completed Sent Completed Completed Completed
11.10.2016 09.08.2016
Sent Completed
2015_22-SAG-OC_EEHC-L-00188
Local Authority Approval for Permanent Works of the Discharge Structure and Discharge pipe lines
No
08.08.2016
Completed
2015_22-SAG-OC_EEHC-L-00210 2015_22-SAG-OC_EEHC-L-00184 2015_22-SAG-OC_EEHC-L-00212 2015_22-SAG-OC_EEHC-L-00201 2015_22-SAG-OC_EEHC-L-00213 2015_22-SAG-OC_EEHC-L-00214 2015_22-SAG-OC_EEHC-L-00202 2015_22-SAG-OC_EEHC-L-00215 2015_22-SAG-OC_EEHC-L-00216 2015_22-SAG-OC_EEHC-L-00217 2015_22-SAG-OC_EEHC-L-00219 2015_22-SAG-OC_EEHC-L-00205 2015_22-SAG-OC_EEHC-L-00204 2015_22-SAG-OC_EEHC-L-00206
No No Yes No No No Yes No No Yes Yes No Yes No
08.08.2016 10.08.2016 11.08.2016 15.08.2016 15.08.2016 18.08.2016 29.08.2016 29.08.2016 29.08.2016 04.09.2016 08.09.2016 09.09.2016 12.09.2016 12.09.2016
Completed Completed Sent Completed Completed Completed Sent Completed Completed Sent Sent Completed Sent Completed
2015_22-SAG-OC_EEHC-L-00218 2015_22-SAG-OC_EEHC-L-00220
Commissioning Power Source Re Final Site Layout and Security Requirements 2015_22-SAG-OC_EEHC-L-00212 Condition of the temporary Gas Reducing Station AFOA Approval Requirements Monthly Progress Report No. 11 Part 1/2 Notice of Force Majeure - Additional Floods in China 2015_22-SAG-OC_EEHC-L-00202 Gas Reducing Station – Interface Point Halting Works in Gas Reducing Station Monthly Progress Report No 12. Part 1 of 3 Revised Offer for extra works related to the gas reducing station Height Restriction for Crossing Underneath of Energized 500kV Overhead Transmission Line (OHTL) Offshore Mines Scan on Site Re Gas Reducing Station Interface Point 2015_22-SAG-OC_EEHC-L-00206 Re Offshore Works Permits 2015_22-SAG-OC_EEHC-L-00218 2015_22-SAG-EEHC-L-00316 Re - Condition and Readiness of Temporary Gas Reducing Station Commissioning Power Source
Yes No
12.09.2016 12.09.2016
19.09.2016
Completed Completed
2015_22-SAG-OC_EEHC-L-00221 2015_22-SAG-OC_EEHC-L-00208 2015_22-SAG-OC_EEHC-L-00224 2015_22-SAG-OC_EEHC-L-00225 2015_22-SAG-OC_EEHC-L-00223 2015_22-SAG-OC_EEHC-L-00226 2015_22-SAG-OC_EEHC-L-00228 2015_22-SAG-OC_EEHC-L-00229 2015_22-SAG-OC_EEHC-L-00230 2015_22-SAG-OC_EEHC-L-00232 2015_22-SAG-OC_EEHC-L-00234 2015_22-SAG-OC_EEHC-L-00236 2015_22-SAG-OC_EEHC-L-00227 2015_22-SAG-OC_EEHC-L-00237 2015_22-SAG-OC_EEHC-L-00209 2015_22-SAG-OC_EEHC-L-00239 2015_22-SAG-OC_EEHC-L-00240 2015_22-SAG-OC_EEHC-L-00235 2015_22-SAG-OC_EEHC-L-00231 2015_22-SAG-OC_EEHC-L-00241
Design and operation data, cleanliness for the Permanent and Temporary Gas reducing stations at Burullus site Re Invoice Documentation Incident Report 2015_22-SAG-OC_EEHC-L-00225 RE - Missed Project Schedule Gas supply pressure (long term trend) of upstream gas reducing station Re Delays in Project Time (2) RE Minutes of Meeting 16 August 2016 Mobile Construction Power Switchgear The Application of the Value Added Tax Law No. 67 for Year 2016 Construction of the Alternative Structures Alternative Structures for Air Defense Forces Readiness of GIS gantry (OHL1) for connection with the temporary transmission line (Abu Kir –Badr). Re Gas Reducing Station Interface Point Estimated consumption of the fuel gas during commissioning Re Remarks on Monthly Progress Report No.12 Common Remote Service Platform (cRSP) Interface to DCS Cleaning of gas reducing station_QC documentation_3rd party inspection Monthly Progress Report No. 13 Part 1 of 2 RE Gas pipe line trench in the Gas Reducing Third-Party Inspection of the Main Gas Supply line and Gas Reducing Station
Yes Yes No No Yes No No No No No No Yes Yes No No No Yes No No Yes
16.09.2016 27.09.2016 27.09.2016 27.09.2016 28.09.2016 28.09.2016 28.09.2016 28.09.2016 28.09.2016 28.09.2016 28.09.2016 28.09.2016 30.09.2016 02.10.2016 07.10.2016 07.10.2016 14.10.2016 17.10.2016 18.10.2016 19.10.2016
23.09.2016 12.10.2016
Completed Sent Completed Completed Sent Completed Completed Completed Completed Completed Completed Sent Sent Completed Completed Completed Sent Completed Completed Sent
10.08.2017
16.08.2016
12.09.2016
15.09.2016 15.09.2016 27.09.2016
03.10.2016
05.10.2016 14.10.2016
21.10.2016
24.10.2016
Reference to 2015_22-OC_EEHC-L-00161; 2015_22SAG-OC_EEHC-L-00156
2015_22_EEHC_SAG-OC-L-00131 2015_22-SAG-OC_EEHC-L-00162 2015_22_EEHC_SAG-OC-L-00185 2015_22-SAG-OC_EEHC-L-00188; 2015_22-SAG-OC_EEHC-L-00233
2015_22_EEHC_SAG-OC-L-00188 2015_22-OC_EEHC-L-00196; 2015_22SAG-OC_EEHC-L-00188 2015_22_EEHC_SAG-OC-L-00207; 2015_22-SAG-OC_EEHC-L-00233 2015_22-SAG-OC_EEHC-L-00196; 2015_22-SAG-OC_EEHC-L-00203; 2015_22-SAG-OC_EEHC-L-00233 2015_22_EEHC_SAG-OC-L-00187; 2015_22-SAG-OC_EEHC-L-00174
2015_22-SAG-OC_EEHC-L-00233
2015_22_EEHC_SAG-OC-L-00193
2015_22-SAG-OC_EEHC-L-00158 2015_22-SAG-OC_EEHC-L-00233 2015_22_EEHC_SAG-OC-L-00198 2015_22_EEHC_SAG-OC-L-00201 2015_22_EEHC_SAG-OC-L-00195; 2015_22_EEHC_SAG-OC-L-00202 2015_22_EEHC_SAG-OC-L-00194
2015_22_EEHC_SAG-OC-L-00204 2015_22_EEHC_SAG-OC-L-00192 2015_22_EEHC_SAG-OC-L-00197 2015_22_EEHC_SAG-OC-L-00206
2015_22-EEHC_OC-L-00040 2015_22_EEHC_SAG-OC-L-00205 2015_22_EEHC_SAG-OC-L-00203 2015_22-SAG-OC_EEHC-L-00241 2015_22_EEHC_SAG-OC-L-00210 2015_22-SAG-OC_EEHC-L-00240
Page 4 of 5
Letter-No.(int.)
Project: EG1019
Correspondence List (consortium to Customer)
SIEMENS Subject
Reply Req. Corr. Date
Target Date
Status
2015_22-SAG-OC_EEHC-L-00233 2015_22-SAG-OC_EEHC-L-00242 2015_22-SAG-OC_EEHC-L-00246 2015_22-SAG-OC_EEHC-L-00248 2015_22-SAG-OC_EEHC-L-00250
Offshore Mines Scan Damage of 500kV Cable Notice of Force Majeure Re Mine Clearance Certificate for On-Shore Portion of Works Notice of Force Majeure
Yes No No Yes No
20.10.2016 24.10.2016 24.10.2016 24.10.2016 24.10.2016
03.11.2016
Sent Completed Completed Sent Completed
2015_22-SAG-OC_EEHC-L-00243 2015_22-SAG-OC_EEHC-L-00254
Re Electrical Works Offer for GRS Project Management Plan Rev. A
Yes No
31.10.2016 07.11.2016
07.11.2016
2015_22-SAG-OC_EEHC-L-00255 2015_22-SAG-OC_EEHC-L-00256 2015_22-SAG-OC_EEHC-L-00257
On-Site Tests for MV Cables MoM MDEPC-Meeting on site 8th November 2016 Monthly Progress Report No. 14 Part1/2
No No No
08.11.2016 10.11.2016 14.11.2016
Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00258 2015_22-SAG-OC_EEHC-L-00259 2015_22-SAG-OC_EEHC-L-00260 2015_22-SAG-OC_EEHC-L-00244 2015_22-SAG-OC_EEHC-L-00261 2015_22-SAG-OC_EEHC-L-00245
Re: On-Site Tests for MV Cables Reply to Collective Notes Natural Gas Analysis Executive Order - Increase of fuel prices. Labor Fights Re Electrical Works Offer for GRS
No No Yes No No Yes
14.11.2016 15.11.2016 15.11.2016 16.11.2016 24.11.2016 30.11.2016
16.12.2016
Completed Completed Sent Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00249 2015_22-SAG-OC_EEHC-L-00253
Yes Yes
30.11.2016 30.11.2016
07.12.2016 12.12.2016
Sent Sent
2015_22-SAG-OC_EEHC-L-00251 2015_22-SAG-OC_EEHC-L-00252 2015_22-SAG-OC_EEHC-L-00264 2015_22-SAG-OC_EEHC-L-00268 2015_22-SAG-OC_EEHC-L-00269 2015_22-SAG-OC_EEHC-L-00270 2015_22-SAG-OC_EEHC-L-00271 2015_22-SAG-OC_EEHC-L-00272 2015_22-SAG-OC_EEHC-L-00273 2015_22-SAG-OC_EEHC-L-00263 2015_22-SAG-OC_EEHC-L-00274 2015_22-SAG-OC_EEHC-L-00265 2015_22-SAG-OC_EEHC-L-00275
Performance Letter of Guarantee Requested under the Minutes of the Final Meeting of the SPA Quantities Status RESEND - Re Electrical Works Offer for GRS 2015_22-SAG-OC_EEHC-L-00251 Retention Letter of Guarantee Requested under the Minutes of the Final Meeting of the SPA Quantities Status Extension of the SPA Performance and Retention Letter of Guarantee Notice of Force Majeure Request to send a Letter to AFOA Request to send a Letter to Ministry of Irrigation - Central Sector of Groundwater ReTrip Event of Abu Quir - Burullus Circuit Site Preparation Agreement Completion Date Notice of Force Majeure Re Mine Scan Letter from EEHC dated 22 January 2017 Re: 2015_22-SAG-OC_EEHC-L-00263 Support for Offshore Mines Scan Monthly Progress Report No. 15 Part1/2 Notice of Force Majeure Re Collective notices (2)
Yes Yes No Yes Yes No No No No Yes No No No
01.12.2016 05.12.2016 05.12.2016 05.12.2016 05.12.2016 05.12.2016 05.12.2016 05.12.2016 05.12.2016 06.12.2016 15.12.2016 21.12.2016 21.12.2016
07.12.2016 19.12.2016
Sent Sent Completed Sent Sent Completed Completed Completed Completed Sent Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00276 2015_22-SAG-OC_EEHC-L-00277
Re Time Schedule for First Fire and First power to grid of Units 42, 41, 32 and 31 open cycle Re Trip Event of the Main Transformer BAT41
No No
23.12.2016 31.12.2016
Completed Completed
2015_22-SAG-OC_EEHC-L-00278 2015_22-SAG-OC_EEHC-E-00279 2015_22-SAG-OC_EEHC-L-00279 2015_22-SAG-OC_EEHC-E-00001 2015_22-SAG-OC_EEHC-L-00280 2015_22-SAG-OC_EEHC-L-00281 2015_22-SAG-OC_EEHC-L-00266
Re: Time Schedule for First Fire and First Power to grid of Units 42,41,32,and 31 open cycle (2) 2015_22-SAG-OC_EEHC-L-00279 41BAT01 Trip Event Inspection Report 41BAT01 Trip Event Inspection Report WG: 2015_22-SAG-OC_EEHC-L-00279 41BAT01 Trip Event Inspection Report Re Trip Event of Main Transformer 41BAT Monthly Progress Report No.16 Part1/2 Re Workers in Burullus Project
No No No No No No No
02.01.2017 05.01.2017 05.01.2017 06.01.2017 16.01.2017 24.01.2017 25.01.2017
Completed Completed Completed Completed Completed Completed Completed
2015_22-SAG-OC_EEHC-L-00282 2015_22-SAG-OC_EEHC-L-00283 2015_22-SAG-OC_EEHC-L-00284 2015_22-SAG-OC_EEHC-L-00285 2015_22-SAG-OC_EEHC-L-00287 2015_22-SAG-OC_EEHC-L-00289 2015_22-SAG-OC_EEHC-L-00293 2015_22-SAG-OC_EEHC-L-00292
Trip Event of 41BAT Main Transformer - Minutes of Meeting 14-Jan-2017 Request to send a Letter to Ministry of Transportation - Maritime Transport Sector (MTS) Plant Shutdown for Commissioning Work Request to send a Letter to Ministry of Transportation - Maritime Transport Sector (MTS) Notice of Force Majeure Navigational Traffic Signs around Intake Pipelines Velocity Caps Biodiversity MoU Monthly Progress Report No. 17 Part1/2
No No Yes No No No No No
26.01.2017 03.02.2017 07.02.2017 09.02.2017 09.02.2017 09.02.2017 15.02.2017 17.02.2017
10.08.2017
Letter-No.(ext.)
05.12.2016
22.11.2016
16.01.2017 16.01.2017
13.12.2016
14.02.2017
Completed Completed
Completed Completed Sent Completed Completed Completed Completed Completed
Reference to 2015_22-SAG-OC_EEHC-L-00188; 2015_22-SAG-OC_EEHC-L-00196; 2015_22-SAG-OC_EEHC-L-00201; 2015_22-SAG-OC_EEHC-L-00205; 2015_22-SAG-OC_EEHC-L-00207 2015_22_EEHC_SAG-OC-L-00212 2015_22_EEHC_SAG-OC-L-00220 2015_22_EEHC_SAG-OC-L-00193; 2015_22_EEHC_SAG-OC-L-00211 2015_22_EEHC_SAG-OC-L-00215; 2015_22-SAG-OC_EEHC-L-00305
2015_22_EEHC_SAG-OC-L-00219; 2015_22-SAG-OC_EEHC-L-00305 2015_22_EEHC_SAG-OC-L-00208 2015_22-SAG-OC_EEHC-L-00158 2015_22_EEHC_SAG-OC-L-00218
2015_22_EEHC_SAG-OC-L-00218
2015_22_EEHC_SAG-OC-L-00228
2015_22_EEHC_SAG-OC-L-00224 2015_22_EEHC_SAG-OC-L-00225; 2015_22_EEHC_SAG-OC-L-00226 2015_22_EEHC_SAG-OC-L-00227 2015_22_EEHC_SAG-OC-L-00230; 2015_22_EEHC_SAG-OC-L-00231
2015_22_EEHC_SAG-OC-L-00234 2015_22_EEHC_SAG-OC-L-00223 2015_22_EEHC_SAG-OC-L-00227; 2015_22_EEHC_SAG-OC-L-00233
Page 5 of 5
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
A 3. Correspondence status SAG
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Project: EG1019 MPR No.: 23
Correspondence List (Customer to SAG)
SIEMENS Letter-No.(int.) 2015_22-EEHC-SAG-L-00001
Letter-No.(ext.)
Subject EG1019 PM 2015_22-EEHC-SAG-L-0001 500 KV Outdoor Equipment
Reply Req. Corr. Date Yes 09.09.2015
Target Date 23.09.2015
Status Completed
2015_22-EEHC-SAG-L-00002 2015_22-EEHC-SAG-L-00003
2015_22-EEHC-SAG-L-00002
EG1019 PM 2015_22-EEHC_SAG-L-00002 500KV Switchgear, Battery, Charger, Steel Structure, Over Head Crane EG 1019 PM 2015_22-EEHC_SAG -L-00003 Training on electronic correspondences
Yes No
28.09.2015 29.09.2015
02.10.2015
Completed Completed
2015_22-EEHC-SAG-L-00004
2015_22-EEHC_SAG -L-00004 500 KV GIS local control cubicle design
Yes
29.09.2015
05.10.2015
Completed
2015_22-SAG-EEHC-L-00030; 2015_22-SAG-EEHC-L-00049
2015_22-EEHC-SAG-L-00005
EG 1019 PM 2015_22- EEHC-SAG-L-00005
Yes
30.09.2015
07.10.2015
Completed
2015_22-SAG-EEHC-L-00026; 2015_22-SAG-EEHC-L-00027; 2015_22-SAG-EEHC-L-00043
2015_22-EEHC-SAG-L-00006
EG 1019 CON 2015_22- EEHC-SAG -L-00006 500KV switchgear, spare feeder bay = B23 Re: EG1019 PM 2015_22-SAG-EEHC-L-00019 Contractual Clarification List Items 177 and 324 Flow Measurements for Sulphur Heaters
Yes
07.10.2015
14.10.2015
Completed
2015_22-SAG-EEHC-L-00041; 2015_22-SAG-EEHC-L-00046
2015_22-EEHC-SAG-E-00006
Yes
09.10.2015
20.10.2015
Completed
2015_22-SAG-EEHC-L-00058
2015_22-EEHC-SAG-E-00007
WG: referring to burullus , meni suef and new administrative capital combined cycle power projects
No
19.10.2015
2015_22-EEHC-SAG-E-00008
specification for transformer and generator monitoring
Yes
19.10.2015
26.10.2015
Completed
2015_22-SAG-EEHC-L-00054; 2015_22-SAG-EEHC-L-00059
2015_22-EEHC-SAG-L-00007
EG 1019 PM 2015_22- EEHC-SAG -L-00007 Secondary system, local control cubicle
Yes
19.10.2015
24.10.2015
Completed
2015_22-SAG-EEHC-L-00044; 2015_22-SAG-EEHC-L-00062
2015_22-EEHC-SAG-L-00008 2015_22-EEHC-SAG-L-00010
Re:Reminder telecomunication EG 1019 PM 2015_22-SAG- EEHC-L-00010 500 KV GIS local control cubicle design
Yes Yes
20.10.2015 21.10.2015
06.11.2015 25.10.2015
Completed Completed
2015_22-SAG-EEHC-L-00036; 2015_22-SAG-EEHC-L-00052 2015_22-SAG-EEHC-L-00067
2015_22-SAG- EEHC-L-00011 Switchgear Bay Feeder 23
Yes
22.10.2015
29.10.2015
Completed
2015_22-SAG-PGE-L-00070; 2015_22-SAG-PGE-L-00102
Re: AW: 2015_22-SAG- EEHC-L-00009 HV Equipment connection at Gantry Area
Yes
23.10.2015
30.10.2015
Completed
2015_22-SAG-EEHC-L-00047; 2015_22-SAG-EEHC-L-00068; 2015_22-SAG-EEHC-L-00073
2015_22- EEHC- SAG -T-000001 Inspection and Test Plan concerning Exhaust System 2015_22-EEHC-SAG-T-000002 AC/DC Distribution Single lines, AC load Calculation 2015_22- EEHC-SAG -T-000003 Electrical Single Line Diagram
Yes Yes Yes
24.10.2015 25.10.2015 26.10.2015
28.10.2015 30.10.2015 30.10.2015
Completed Completed Completed
2015_22-SAG-EEHC-L-00065; 2015_22-SAG-EEHC-L-00106 2015_22-SAG-EEHC-L-00066 2015_22-SAG-EEHC-L-00084
Yes
26.10.2015
30.10.2015
Completed
2015_22-EEHC-SAG-E-00007; 2015_22-SAG-EEHC-L-00054; 2015_22-SAG-EEHC-L-00082
No Yes
27.10.2015 27.10.2015
03.11.2015
Completed Completed
2015_22-SAG-EEHC-E-00001 2015_22-SAG-EEHC-L-00080
Yes Yes
29.10.2015 01.11.2015
05.11.2015 06.11.2015
Completed Completed
2015_22-SAG-EEHC-L-00092 2015_22-SAG-OC_EEHC-L-00053
2015_22-EEHC-SAG-E-00013
2015_22- EEHC-SAG - L-000013 Generator Transformer Monitoring Re: EG1019 PM 2015_22-SAG-EEHC-L-00061 Comment to Client letter 2015_22-EEHC-SAG-L0002, Battery and UPS, Specification Lead acid battery (DTS0055) _22- EEHC-SAG -L-00012 Secondary system, local control cubicle 2015_22-EEHC-SAG-T-000004 Inspection and Test Plan for Generator and Generator Circuit Breaker EG1019 PM 2015_22- EEHC_SAG- L-00014 Load List for Auxiliaries for all units Re: EG1019 PM 2015_22-SAG-EEHC-L-00065 Inspection and Test Plan concerning Exhaust System
Yes
03.11.2015
04.11.2015
Completed
2015_22-SAG-EEHC-L-00075
2015_22-EEHC-SAG-E-00036 2015_22-EEHC-SAG-L-00015 2015_22-EEHC-SAG-L-00016
Fw: Assumptions for the design of the receiving gantry for Burullus PP Project EG 1019 PM 2015_22-EEHC-SAG -L-00015 Subcontractor of HRSG EG1019 PM 2015_22- EEHC-SAG-L-00016 ITP Meeting
Yes No Yes
03.11.2015 08.11.2015 08.11.2015
06.11.2015 13.11.2015
Completed Completed Completed
2015_22-SAG-EEHC-L-00051; 2015_22-SAG-EEHC-L-00074 2015_22-SAG-EEHC-L-00077 2015_22-SAG-EEHC-L-00085
2015_22-EEHC-SAG-E-00038
EG1019 PM 2015 - 23-SAG-EEHC
Yes
09.11.2015
14.11.2015
Completed
2015_22-SAG-EEHC-L-00051; 2015_22-SAG-EEHC-L-00088; 2015_22-SAG-EEHC-L-00089
2015_22-EEHC-SAG-L-00017 2015_22-EEHC-SAG-E-00014 2015_22-EEHC-SAG-L-00018
EG1019 PM 2015_22- EEHC-SAG -L-00017 Shipper's own container-Ownership Structures EEHC Chairman delegation letter for Burullus EG1019 PM 2015_22- EEHC-SAG -L-00018 RE: Generator Rotor Removal Concept
Yes No Yes
10.11.2015 13.11.2015 16.11.2015
17.11.2015 23.11.2015
Completed Completed Completed
2015_22-EEHC-SAG-E-00015 2015_22-EEHC-SAG-L-00019 2015_22-EEHC-SAG-L-00021
EG1019 2015_22- EEHC-SAG -L-00019 Owner Required Letters. EG1019 PM 2015_22- EEHC-SAG -L-00021 Nomination of new supplier
Yes Yes Yes
17.11.2015 17.11.2015 17.11.2015
24.11.2015 25.11.2015 23.11.2015
Completed Completed Completed
2015_22-SAG-EEHC-L-00101 2015_22-SAG-OC_EEHC-L-00057; 2015_22-SAG-OC_EEHC-L00068 2015_22-SAG-EEHC-L-00105 2015_22-SAG-EEHC-L-00096
2015_22-EEHC-SAG-L-00020 2015_22-EEHC-SAG-E-00022
2015_22- EEHC-SAG -L-00020 Generator Transformer Monitoring EG1019 PM 2015_22- EEHC-SAG -L-00022 Nomination of new supplier
Yes No
18.11.2015 21.11.2015
03.12.2015
Completed Completed
2015_22-SAG-EEHC-L-00082; 2015_22-SAG-EEHC-L-00102 2015_22-SAG-EEHC-L-00096
2015_22-EEHC-SAG-L-00024
2015_22- EEHC-SAG -L-00024 500 KV GIS,Telecommunication system
Yes
21.11.2015
26.11.2015
Completed
2015_22-SAG-EEHC-L-00033; 2015_22-SAG-EEHC-L-00055; 2015_22-SAG-EEHC-L-00110
2015_22-EEHC-SAG-L-00023 2015_22-EEHC-SAG-E-00039 2015_22-EEHC-SAG-L-00025 2015_22-EEHC-SAG-L-00026 2015_22-EEHC-SAG-E-00040 2015_22-EEHC-SAG-E-00043 2015_22-EEHC-SAG-E-00041 2015_22-EEHC-SAG-E-00042 2015_22-EEHC-SAG-L-00027 2015_22-EEHC-SAG-L-00028 2015_22-EEHC-SAG-L-00029
2015_22- EEHC-SAG -L-00023 Feeder =B23, Local control cubicle and secondary systems RE: 2015_22- EEHC_SAG-OC -L-00041 Letter to Minister of Transportation 2015_22- EEHC-SAG -L-00025 Electrical Single Line Diagram EG1019 PM2015_22- EEHC-SAG -L-00026 Air intake filter clarifications Connecting West Burullus & New Capital PS 500 kV 2015_22- EEHC-SAG -T-000005 Water Balance 2015-22-SAG-EEHC-L-00100 Required Data for insulation coordination study 2015-22-sag-oceehc-l-0065 driven piles - steel pipes 2015_22-SAG- EEHC-L-00027 Re: Owner Required Letters 2015_22-SAG- EEHC-L-00028 500 kV GlS, Spare feeder bay =B23 EG1019 PM 2015_22- EEHC-SAG -L-00029- Re 11 KV Commissioning Power Details
No No Yes Yes Yes Yes Yes Yes No Yes Yes
22.11.2015 24.11.2015 26.11.2015 26.11.2015 29.11.2015 01.12.2015 02.12.2015 03.12.2015 05.12.2015 05.12.2015 05.12.2015
2015_22-EEHC-SAG-L-00011
2015_22-EEHC-SAG-L-00011
2015_22-EEHC-SAG-L-00009 2015_22-EEHC-SAG-E-00032 2015_22-EEHC-SAG-E-00016 2015_22-EEHC-SAG-E-00033
2015_22-EEHC-SAG-T-000001 2015_22-EEHC-SAG-T-000002 2015_22-EEHC-SAG-T-000003
2015_22-EEHC-SAG-L-00013 2015_22-EEHC-SAG-E-00009 2015_22-EEHC-SAG-L-00012 2015_22-EEHC-SAG-E-00017 2015_22-EEHC-SAG-L-00014
10.08.2017
2015_22-EEHC-SAG-T-000004
2015_22-EEHC-SAG-T-000005
Reference to 2015_22-SAG-EEHC-L-00031
2015_22-SAG-EEHC-L-00028; 2015_22-SAG-EEHC-L-00029; 2015_22-SAG-EEHC-L-00044; 2015_22-SAG-EEHC-L-00045; 2015_22-SAG-EEHC-L-00061
Completed
05.12.2015 05.12.2015 11.12.2015 06.12.2015 16.12.2015 11.12.2015 11.12.2015 11.12.2015
Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00072; 2015_22-SAG-EEHC-L-00081
2015_22-SAG-EEHC-L-00080; 2015_22-SAG-EEHC-L-00099 2015_22_EEHC_SAG-OC-L-00041 2015_22-SAG-EEHC-L-00116 2015_22-SAG-EEHC-L-00118 2015_22-SAG-EEHC-L-00122 2015_22-SAG-EEHC-L-00120 2015_22-SAG-EEHC-L-00123 2015_22-SAG-OC_EEHC-L-00065 2015_22-SAG-EEHC-L-00126 2015_22-SAG-EEHC-L-00109
Page 1 of 4
Project: EG1019 MPR No.: 23
Correspondence List (Customer to SAG)
SIEMENS Letter-No.(int.)
Letter-No.(ext.)
2015_22-EEHC-SAG-E-00044 2015_22-EEHC-SAG-E-00075
2015_22-EEHC-SAG-T-000006 2015_22-EEHC-SAG-T-000007
Subject EG1019 PM 2015_22- EEHC-SAG -T-000006 Specification for Grounding and Lightning Protection System EG1019 PM 2015_22- EEHC-SAG -T-000007 IEEE AVR / PSS Model Descriptions
Reply Req. Corr. Date
Target Date
Status
Reference to
Yes Yes
06.12.2015 06.12.2015
14.12.2015 19.07.2016
Completed Completed
2015_22-EEHC-SAG-E-00046 2015_22-EEHC-SAG-L-00030 2015_22-EEHC-SAG-E-00045 2015_22-EEHC-SAG-L-00031 2015_22-EEHC-SAG-E-00047
2015_22-EEHC-SAG-T-000008
2015_22-SAG-EEHC-L-00136
No Yes Yes Yes Yes
07.12.2015 07.12.2015 08.12.2015 08.12.2015 10.12.2015
11.12.2015 15.12.2015 15.12.2015 15.12.2015
Completed Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00128 2015_22-SAG-EEHC-L-00231 2015_22-SAG-EEHC-L-00119 2015_22-SAG-EEHC-L-00346
Yes Yes
15.12.2015 15.12.2015
23.12.2015 22.12.2015
Completed Completed
2015_22-SAG-EEHC-L-00158 2015_22-SAG-EEHC-L-00178
2015_22-EEHC-SAG-L-00032
2015_22- EEHC-SAG -T-000008 Revision Inspection and Test Plan for Generator Circuit Breaker EG1019 PM 2015_22- EEHC-SAG -L-00030 - Re Inspection Schedule Exhaust Bypass Stack GA drawing, P&ID L-00031 Nomination of additional supplier Missed pages in Contract (2) 2015_22- EEHC-SAG -T-000011 Inspection and Test Plan concerning Low Voltage Switchgear ,battery and SFC/SEE equipment 2015_22- EEHC-SAG -T-000010 Inspection and Test Plan for battery EG1019 PM 2015_22- EEHC-SAG -L-00032 - Re Protection Panels for Generator and Steam Turbine
2015_22-EEHC-SAG-E-00048 2015_22-EEHC-SAG-E-00049
2015_22-EEHC-SAG-T-000011 2015_22-EEHC-SAG-T-000010
No
16.12.2015
Completed
2015_22-SAG-EEHC-L-00121
2015_22-EEHC-SAG-L-00033 2015_22-EEHC-SAG-E-00050 2015_22-EEHC-SAG-L-00034 2015_22-EEHC-SAG-E-00051
2015_22-SAG- EEHC-L-00033 Inspection Arrangements 2015_22- EEHC-SAG -T-000012 P&IDs for Fuel Gas System and Fuel Gas Compressor 2015_22- EEHC-SAG -L-00034 Water Balance 2015_22- EEHC-SAG -T-000014 I&C DCS Cabinet Overview
Yes Yes Yes Yes
17.12.2015 18.12.2015 18.12.2015 20.12.2015
22.12.2015 25.12.2015 25.12.2015 23.12.2015
Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00103; 2015_22-SAG-EEHC-L-00125 2015_22-SAG-EEHC-L-00155 2015_22-SAG-EEHC-L-00131 2015_22-SAG-EEHC-L-00134
2015_22-EEHC-SAG-L-00035
EG1019 PM 2015_22- EEHC-SAG-L-00035 - RE Invitation for Surge Arrestors
Yes
21.12.2015
28.12.2015
Completed
2015_22-SAG-EEHC-L-00103; 2015_22-SAG-EEHC-L-00132
2015_22-EEHC-SAG-E-00052 2015_22-EEHC-SAG-E-00053 2015_22-EEHC-SAG-E-00054 2015_22-EEHC-SAG-E-00055
Connecting West Burullus & New Capital P/S 500 kV 2015-23-SAG-EEHC-L-00116 Invitation for Factory Acceptance Tests Surge Arresters 2015_22- EEHC-SAG -T-000013 Auxiliary system P&IDs for GHC, GM and QFB 2015_22- EEHC-SAG -T-000015 GTG OEMs documents (Part 1)
Yes Yes Yes Yes
22.12.2015 22.12.2015 22.12.2015 22.12.2015
05.01.2016 05.01.2016 29.12.2015 29.12.2016
Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00140; 2015_22-SAG-EEHC-L-00153 2015_22-SAG-EEHC-L-00137 2015_22-SAG-EEHC-L-00166 2015_22-SAG-EEHC-L-00210
2015_22-EEHC-SAG-E-00056
Fw: 2015-23-SAG-EEHC-L-00116 Invitation for Factory Acceptance Tests Surge Arresters
Yes
24.12.2015
07.01.2016
Completed
2015_22-SAG-EEHC-L-00103; 2015_22-SAG-EEHC-L-00137
2015_22-EEHC-SAG-E-00057
Fw: 2015-23-SAG-EEHC-L-00116 Invitation for Factory Acceptance Tests Surge Arresters
Yes
24.12.2015
07.01.2016
Completed
2015_22-SAG-EEHC-L-00103; 2015_22-SAG-EEHC-L-00137
2015_22-EEHC-SAG-E-00058
2015_22-SAG-EEHC-L-00132 Invitation for Surge Arrestors
Yes
24.12.2015
31.12.2015
Completed
2015_22-SAG-EEHC-L-00103; 2015_22-SAG-EEHC-L-00132
2015_22-EEHC-SAG-L-00036
2015_22-SAG- EEHC-L-00036 Protection Panels for Generator and Steam Turbine
Yes
25.12.2015
04.01.2016
Completed
2015_22-SAG-EEHC-L-00121; 2015_22-SAG-EEHC-L-00164
2015_22-EEHC-SAG-L-00037
2015_22-EEHC- SAG-L-00037 Re: Inspection Schedule
Yes
30.12.2015
06.01.2016
Completed
2015_22-SAG-EEHC-L-00128; 2015_22-SAG-EEHC-L-00161
2015_22-EEHC-SAG-L-00038 2015_22-EEHC-SAG-L-00039 2015_22-EEHC-SAG-E-00059 2015_22-EEHC-SAG-E-00060
2015_22-EEHC-SAG-T-000016 2015_22-EEHC-SAG-T-000017
No Yes Yes Yes
30.12.2015 31.12.2015 10.01.2016 10.01.2016
07.01.2016 15.01.2016 15.01.2016
Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00135 2015_22-SAG-EEHC-L-00145 2015_22-SAG-EEHC-L-00168 2015_22-SAG-EEHC-L-00162
2015_22-EEHC-SAG-E-00061
2015_22-EEHC-SAG-T-000018
2015_22-EEHC- SAG-L-00038 Re: BCU and HMI Typical Screen Pictures 2015_22- EEHC-SAG -L-00039 Issues of Debate 2015_22- EEHC-SAG -T-000016 P&IDs Water/Steam Cycle and Cooling Water Systems 2015_22- EEHC-SAG -T-000017 P&IDs Water/Steam Cycle and Cooling Water Systems 2015_22-EEHC-SAG-T-000018 Inspection and Test Plan concerning Feed water pump, main transformer and HRSG
Yes
17.01.2016
22.01.2016
Completed
2015_22-SAG-EEHC-L-00176
2015_22-EEHC-SAG-T-000020 2015_22-EEHC-SAG-T-000019
2015_22-EEHC- SAG-L-00040 SCS and DCS Signal list 2015_22-EEHC-SAG-L-00041 Nomination of Additional Suppliers for Valves 2015_22-EEHC-SAG-T-000020 P&IDs water/steam cycle and cooling water systems 2015_22-EEHC-SAG-T-000019 Piping and Instrumentation Diagram (P&ID) of HRSG
Yes Yes Yes Yes
17.01.2016 17.01.2016 20.01.2016 20.01.2016
24.01.2016 26.01.2016 27.01.2016 27.01.2016
Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00146; 2015_22-SAG-EEHC-L-00182 2015_22-SAG-EEHC-L-00157 2015_22-SAG-EEHC-L-00173 2015_22-SAG-EEHC-L-00172
2015_22-EEHC-SAG-L-00042 2015_22-EEHC-SAG-L-00043 2015_22-EEHC-SAG-L-00044
2015_22-EEHC- SAG-L-00042 SCS Functional Design Specification 2015_22- EEHC-SAG -L-00043 RE: P&lDs for Fuel Gas system and Fuel Gas Compressor PM 2015_22- EEHC-SAG -L-00044 SCS Properties
Yes Yes Yes
20.01.2016 22.01.2016 22.01.2016
28.01.2016 29.01.2016 29.01.2016
Completed Completed Completed
2015_22-SAG-EEHC-L-00149; 2015_22-SAG-EEHC-L-00194 2015_22-SAG-EEHC-L-00185 2015_22-SAG-EEHC-L-00174
2015_22-EEHC-SAG-L-00046 2015_22-EEHC-SAG-L-00045 2015_22-EEHC-SAG-E-00064
2015_22-EEHC-SAG-L-00046 Air intake filter clarifications 2015_22- EEHC-SAG -L-00045 Water / Steam Cycle Meeting Summary Burullus Project - 2015_22-SAG-EEHC-L-00184 SF6 Air Bushing Specification 3150A
Yes Yes Yes
30.01.2016 31.01.2016 07.02.2016
05.02.2016 05.02.2016 19.02.2016
Completed Completed Completed
2015_22-SAG-EEHC-L-00078; 2015_22-SAG-EEHC-L-00232 2015_22-SAG-EEHC-L-00191 2015_22-SAG-EEHC-L-00184
2015_22-EEHC- SAG-L-00047 Re: Fuel Gas analysis 2015_22-EEHC-SAG-T-000022 Service Cooling Water System 2015_22-EEHC-SAG-T-000023 SGC Fire Fighting System P&ID 2015_22- EEHC-SAG -T-000021 GT and ST Documents
Yes Yes Yes Yes
14.02.2016 15.02.2016 15.02.2016 15.02.2016
19.02.2016 22.02.2016 22.02.2016 22.02.2016
Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00188; 2015_22-SAG-EEHC-L-00228 2015_22-SAG-EEHC-L-00207 2015_22-SAG-EEHC-L-00202 2015_22-SAG-EEHC-L-00205
2015_22-EEHC- SAG-L-00048 Water/ Steam Cycle
Yes
15.02.2016
22.02.2016
Completed
2015_22-EEHC-SAG-L-00045; 2015_22-SAG-EEHC-L-00162; 2015_22-SAG-EEHC-L-00203
2015_22- EEHC-SAG -L-00050 P&IDs for Fuel Gas system and Fuel Gas Compressor 2015_22-EEHC- SAG-L-00051 Frequency bandwidth of DPLC 2 2015_22-EEHC-SAG-T-000024 P&I Diagram Instrument Air System Unit 42 2015_22-EEHC_SAG-L-00052 Equipment of Temporary Entry
Yes No Yes Yes
16.02.2016 17.02.2016 23.02.2016 29.02.2016
23.02.2016 28.02.2016 07.03.2016
Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00185; 2015_22-SAG-EEHC-L-00204 2015_22-SAG-EEHC-L-00153 2015_22-SAG-EEHC-L-00263
2015_22-EEHC-SAG-L-00054
2015_22-EEHC_SAG-L-00054 Diesel Generator Concept
Yes
08.03.2016
23.03.2016
Completed
2015_22-SAG-EEHC-L-00183; 2015_22-SAG-EEHC-L-00229
2015_22-EEHC-SAG-L-00055 2015_22-EEHC-SAG-L-00056
2015_22-EEHC_SAG-L-00055 Fire Fighting System P&ID 2015_22-EEHC_SAG-L-00056 Fuel gas analysis for performance test
Yes No
08.03.2016 15.03.2016
23.03.2016
Completed Completed
2015_22-SAG-EEHC-L-00202; 2015_22-SAG-EEHC-L-00226 2015_22-SAG-EEHC-L-00196
2015_22-EEHC-SAG-L-00057 2015_22-EEHC-SAG-E-00070
PM 2015_22-EEHC-SAG-L-00057 GT OEMs Documents (Part1) Commissioning & Startup
Yes Yes
20.03.2016 29.03.2016
29.03.2016 05.04.2016
Completed Completed
2015_22-EEHC-SAG-T-000015; 2015_22-SAG-EEHC-L-00210; 2015_22-SAG-EEHC-L-00233 2015_22-SAG-EEHC-L-00227
2015_22-EEHC-SAG-L-00040 2015_22-EEHC-SAG-L-00041 2015_22-EEHC-SAG-E-00062 2015_22-EEHC-SAG-E-00063
2015_22-EEHC-SAG-L-00047 2015_22-EEHC-SAG-E-00066 2015_22-EEHC-SAG-E-00067 2015_22-EEHC-SAG-E-00068
2015_22-EEHC-SAG-T-000009
2015_22-EEHC-SAG-T-000012 2015_22-EEHC-SAG-T-000014
2015_22-EEHC-SAG-T-000013 2015_22-EEHC-SAG-T-000015
2015_22-EEHC-SAG-T-000022 2015_22-EEHC-SAG-T-000023 2015_22-EEHC-SAG-T-000021
2015_22-EEHC-SAG-L-00048 2015_22-EEHC-SAG-L-00050 2015_22-EEHC-SAG-L-00051 2015_22-EEHC-SAG-E-00069 2015_22-EEHC-SAG-L-00052
10.08.2017
2015_22-EEHC-SAG-T-000024
Page 2 of 4
Project: EG1019 MPR No.: 23
Correspondence List (Customer to SAG)
SIEMENS Letter-No.(int.) 2015_22-EEHC-SAG-E-00072 2015_22-EEHC-SAG-L-00058
Letter-No.(ext.)
Subject packing lists 2015_22- EEHC-SAG -L-00058 Re Diesel Generator Concept
Reply Req. Corr. Date Yes 13.04.2016 Yes 13.04.2016
Target Date 22.04.2016 21.04.2016
Status Completed Completed
Reference to
2015_22-EEHC-SAG-L-00059 2015_22-EEHC-SAG-L-00060
2015_22-EEHC-SAG-L-00059 2015_22-EEHC-SAG-L-00060
2015_22-EEHC_SAG-L-00059 Air Intake Filter Clarifications 2 2015_22-EEHC_SAG-L-00060 Fire and Explosion Protection Concept
Yes Yes
15.04.2016 17.04.2016
26.04.2016 26.04.2016
Completed Completed
2015_22-SAG-EEHC-L-00232; 2015_22-SAG-EEHC-L-00242 2015_22-SAG-EEHC-L-00280
2015_22-EEHC-SAG-L-00061
2015_22-EEHC_SAG-L-00061 Water Steam Cycle-PAC pump documents
Yes
30.04.2016
09.05.2016
Completed
2015_22-SAG-EEHC-L-00203; 2015_22-SAG-EEHC-L-00251
2015_22-EEHC-SAG-L-00062 2015_22-EEHC-SAG-L-00063
2015_22-EEHC_SAG-L-00062 Re: Fuel Gas analysis 2015_22-EEHC_SAG-L-00063 Starting System Transformers Shipment
Yes Yes
30.04.2016 30.04.2016
20.05.2016 09.05.2016
Completed Completed
2015_22-EEHC-SAG-L-00067; 2015_22-SAG-EEHC-L-00228 2015_22-SAG-EEHC-L-00244
2015_22-EEHC-SAG-L-00065
2015_22-EEHC_SAG-L-00065 Re: NECC letter, signal list
Yes
21.05.2016
30.05.2016
Completed
2015_22-SAG-EEHC-L-00243; 2015_22-SAG-EEHC-L-00253; 2015_22-SAG-EEHC-L-00274
2015_22-EEHC-SAG-L-00066 2015_22-EEHC-SAG-L-00067
2015_22-EEHC_SAG-L-00066 Nominees for Factory Tests 1 2015_22-EEHC_SAG-L-00067 Re: Fuel Gas analysis
Yes No
26.05.2016 09.06.2016
08.06.2016
Completed Completed
2015_22-SAG-EEHC-L-00250; 2015_22-SAG-EEHC-L-00262 2015_22-SAG-EEHC-L-00062
2015_22-EEHC-SAG-L-00068
2015_22-EEHC-SAG-L-00068 Inspection Call for Gas Turbine 21
Yes
09.06.2016
17.06.2016
Completed
2015_22-SAG-EEHC-L-00252; 2015_22-SAG-EEHC-L-00259
2015_22-EEHC_SAG-L-00070 Detailed Schedule of GIS Works 2015_22-EEHC-SAG-L-00069 QST Documents 2015_22-EEHC-SAG-L-00071 Re: Inspection Call Final Acceptance XKA, Inspection Schedule
Yes Yes No
12.06.2016 15.06.2016 17.06.2016
23.06.2016 22.06.2016
Completed Completed Completed
2015_22-SAG-EEHC-L-00268; 2015_22-SAG-OC_EEHC-L-00175; 2015_22-SAG-OC_EEHC-L-00179 2015_22-SAG-EEHC-L-00261 2015_22-SAG-EEHC-L-00258
2015_22-EEHC-SAG-L-00072 2015_22-EEHC-SAG-L-00073
Gantry Construction Required for the 500kV Burullus / Samanod Transmission Line 2015_22-EEHC_SAG-L-00073 Temporary Setting of Distance Relays for Burullus/Abu Quir
Yes Yes
22.06.2016 22.06.2016
29.06.2016 29.06.2016
Completed Completed
2015_22-SAG-EEHC-L-00268; 2015_22-SAG-OC_EEHC-L-00175 2015_22-SAG-EEHC-L-00272
2015_22-EEHC-SAG-L-00074 2015_22-EEHC-SAG-L-00075
2015_22-EEHC_SAG-L-00074 Settings of Protection Relays for Outgoing Circuits 2015_22-EEHC-SAG-L-00075 Documentation Quantities
Yes Yes
27.06.2016 03.07.2016
05.07.2016 07.10.2016
Completed Completed
2015_22-SAG-EEHC-L-00247; 2015_22-SAG-EEHC-L-00282 2015_22-SAG-EEHC-L-00353
2015_22-EEHC-SAG-L-00076
2015_22-EEHC-SAG-L-00076 Inspection call, 21BBT Auxiliary Transformer, 20MKA Generator
Yes
14.07.2016
21.07.2016
Completed
2015_22-SAG-EEHC-L-00283; 2015_22-SAG-EEHC-L-00284
2015_22-EEHC-SAG-L-00077
EG 1019 PM 2015_22-EEHC-SAG-L-00077 Inspection nominees for 21BBT Auxiliary Transformer, 20MKA Generator
Yes
18.07.2016
25.07.2016
Completed
2015_22-SAG-EEHC-L-00283; 2015_22-SAG-EEHC-L-00284; 2015_22-SAG-EEHC-L-00292
2015_22-EEHC-SAG-L-00078
2015_22-EEHC-SAG-L-00078 NOMINEES FOR PCC 21UBA3210
Yes
20.07.2016
27.07.2016
Completed
2015_22-EEHC-SAG-L-00066; 2015_22-SAG-EEHC-L-00283; 2015_22-SAG-EEHC-L-00290
2015_22-EEHC-SAG-L-00079
Yes
21.07.2016
28.07.2016
Completed
2015_22-EEHC-SAG-L-00077; 2015_22-EEHC-SAG-L-00078; 2015_22-SAG-EEHC-L-00287; 2015_22-SAG-EEHC-L-00290
2015_22-EEHC-SAG-E-00077
2015_22- EEHC-SAG -L-00079 Re Inspection call, PCC, Inspection schedule RE: 2015_22-SAG-OC_EEHC-L-00178 Reminder - Shore Protection Approval on Intake and Discharge Structures
Yes
24.07.2016
29.07.2016
Completed
2015_22-SAG-OC_EEHC-L-00178
2015_22-EEHC-SAG-L-00080 2015_22-EEHC-SAG-L-00081
2015_22- EEHC-SAG -L-00080 Re Signal list, protection signals 2015_22-EEHC-SAG-L-00081 Vibration Protection
Yes Yes
27.07.2016 28.07.2016
04.08.2016 04.08.2016
Completed Completed
2015_22-SAG-EEHC-L-00274; 2015_22-SAG-EEHC-L-00294 2015_22-SAG-EEHC-L-00296
2015_22-EEHC-SAG-L-00082
2015_22-EEHC-SAG-L-00082 Re Fire and Explosion Protection Concept
Yes
28.07.2016
04.08.2016
Completed
2015_22-SAG-EEHC-L-00280; 2015_22-SAG-EEHC-L-00293
2015_22-EEHC-SAG-L-00083
2015_22-EEHC_SAG-L-00083 Settings of Protection Relays for Outgoing Circuits, Temporary distance relay settings
Yes
17.08.2016
25.08.2016
Completed
2015_22-SAG-EEHC-L-00272; 2015_22-SAG-EEHC-L-00278; 2015_22-SAG-EEHC-L-00282; 2015_22-SAG-EEHC-L-00327
2015_22-EEHC-SAG-L-00084
2015_22-EEHC-SAG-L-00084 Re permission to export fuel gas sample bottle
Yes
23.08.2016
31.08.2016
Completed
2015_22-SAG-EEHC-L-00148; 2015_22-SAG-EEHC-L-00196; 2015_22-SAG-EEHC-L-00302; 2015_22-SAG-EEHC-L-00330
03.10.2016 03.10.2016 11.10.2016
Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00304 2015_22-SAG-EEHC-L-00314 2015_22-SAG-EEHC-L-00335
2015_22-EEHC-SAG-L-00070 2015_22-EEHC-SAG-L-00069 2015_22-EEHC-SAG-L-00071
2015_22-EEHC-SAG-L-00069
2015_22-SAG-EEHC-L-00235
2015_22-EEHC-SAG-E-00304 2015_22-EEHC-SAG-L-00085 2015_22-EEHC-SAG-L-00086 2015_22-EEHC-SAG-L-00088
2015_22-SAG-EEHC-L-00304_RESEND Resend: 2015_22-SAG-EEHC-L-00304 Gas Pressure Reducing Station 2015_22-EEHC-SAG-L-00085 Re Gas Pressure Reducing Station 2015_22-EEHC-SAG-L-00086 Operating Staff for GIS 2015_22-EEHC-SAG-L-00088 Surge Arrester in Generator Circuit Breaker
No Yes Yes Yes
29.08.2016 24.09.2016 25.09.2016 03.10.2016
2015_22-EEHC-SAG-L-00089 2015_22-EEHC-SAG-L-00090 2015_22-EEHC-SAG-L-00091 2015_22-EEHC-SAG-L-00092 2015_22-EEHC-SAG-E-00079
2015_22-EEHC_SAG-L-00089 Spare Parts Offer 2015_22-EEHC-SAG-L-00090 Data for the GRS 2015_22-EEHC_SAG-L-00091 Material Safety Data Sheet of Natural Gas 2015_22-EEHC-SAG-L-00092 Nominee for Main Transformer Inspection 500 kV Cables Connecting Step-up transformer to 500 kV GIS
Yes Yes No Yes Yes
09.10.2016 09.10.2016 18.10.2016 23.10.2016 24.10.2016
17.10.2016 17.10.2016 31.10.2016 31.10.2016
Completed Completed Completed Completed Completed
2015_22-EEHC-SAG-L-00093
2015_22-EEHC_SAG-L-00093 Spare Parts Offer
Yes
29.10.2016
07.11.2016
Completed
2015_22-SAG-EEHC-L-00256; 2015_22-SAG-EEHC-L-00337; 2015_22-SAG-EEHC-L-00364
2015_22-EEHC-SAG-L-00094
2015_22-EEHC-SAG-L-00094 Nominee for PAC Pump Inspection 2015_22-EEHC_SAG-L-00095 Siemens Recommended Spare Parts for two years operation according to Vol.II Sec.0.9 2015_22-EEHC-SAG-L-00096 Certificates for Gas Pipe Line Cleanliness Re Documentation Quantities 2015_22-EEHC_SAG-L-00097 Handed Over Commissioning Documentations
Yes
31.10.2016
07.11.2016
Completed
2015_22-SAG-EEHC-L-00345; 2015_22-SAG-EEHC-L-00352
Yes No No Yes
06.11.2016 12.11.2016 17.11.2016 19.11.2016
14.11.2016
Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00344
2015_22-EEHC-SAG-L-00095 2015_22-EEHC-SAG-L-00096 2015_22-EEHC-SAG-E-00082 2015_22-EEHC-SAG-L-00097
10.08.2017
28.11.2016
2015_22-SAG-EEHC-L-00256; 2015_22-SAG-EEHC-L-00337; 2015_22-SAG-EEHC-L-00364
2015_22-SAG-EEHC-L-00339 2015_22-SAG-EEHC-L-00343
2015_22-SAG-EEHC-L-00353 2015_22-SAG-EEHC-L-00357
Page 3 of 4
Letter-No.(int.) 2015_22-EEHC-SAG-L-00098
Letter-No.(ext.)
Subject 2015_22-EEHC_SAG-L-00098 Difference of GTG Type 2015_22-EEHC_SAG-L-00099 Siemens AG Spare Parts Offer for BOP recommended for 2 years COMBINED CYCLE operation أﻋﻣﺎل اﻟﻣﺳﺢ واﻟﺗطﮭﯾر 2015_22-EEHC_SAG-L-00100 RE: Inspection call 11MB Gas Turbine
Reply Req. Corr. Date Yes 19.11.2016
Target Date 28.11.2016
Status Completed
Reference to 2015_22-SAG-EEHC-L-00368
Yes Yes No
29.11.2016 15.12.2016 08.01.2017
07.12.2016 22.12.2016
Completed Completed Completed
2015_22-SAG-EEHC-L-00333
Yes
11.01.2017
18.01.2017
Completed
2015_22-EEHC_SAG-L-00101 RE: Inspection call PAC pump Rev.1 2015_22-EEHC_SAG-L-00102 EETC Required Data for Units
No Yes
13.01.2017 14.01.2017
Completed Completed
2015_22-EEHC-SAG-L-00094; 2015_22-SAG-EEHC-L-00372
23.01.2017
2015_22-EEHC_SAG-L-00103 Protection of Transformers (3)
Yes
16.01.2017
23.01.2017
Completed
2015_22-EEHC-SAG-L-00013; 2015_22-SAG-EEHC-L-00054
FW: El Burullus / New Capital Combined Cycle Power Plants
No اﻋﻣﺎل ﺗطﮭﯾر ﻣﺎﺧذ وﻣﺧرج اﻟﺑرﻟسYes
17.01.2017 23.01.2017
2015_22-EEHC-SAG-L-00099 2015_22-EEHC-SAG-E-00080 2015_22-EEHC-SAG-L-00100
2015_22-EEHC-SAG-L-00100
2015_22-EEHC-SAG-E-00081
Burullus Power Plant - Trip event BAT 41 Scanned from a Xerox Multifunction Printer
2015_22-EEHC-SAG-L-00101 2015_22-EEHC-SAG-L-00102 2015_22-EEHC-SAG-L-00103 2015_22-EEHC-SAG-E-00084 2015_22-EEHC-SAG-E-00086
Project: EG1019 MPR No.: 23
Correspondence List (Customer to SAG)
SIEMENS
El Burullus / New Capital Combined Cycle Power Plants Intake & Discharge mines scan
2015_22-SAG-EEHC-L-00366
30.01.2017
Completed Completed
2015_22-EEHC-SAG-L-00104
2015_22-EEHC_SAG-L-00104 RE: 3150 A GIS busducts for OHL feeders phase 2
Yes
29.01.2017
06.02.2017
Completed
2015_22-SAG-EEHC-L-00374; 2015_22-SAG-EEHC-L-00385
2015_22-EEHC-SAG-E-00085
2015-22-SAG-OC-EEHC-L-00374 3150 A GIS busduct for OHL Feeders Phase 2
Yes
09.02.2017
16.02.2017
Completed
2015_22-SAG-EEHC-L-00374; 2015_22-SAG-EEHC-L-00392
2015_22-EEHC-SAG-L-00105
2015_22-EEHC-SAG-L-00105 Nominee for LP Steam Turbine 30 Inspection
Yes
11.02.2017
20.02.2017
Completed
2015_22-SAG-EEHC-L-00379; 2015_22-SAG-EEHC-L-00391
2015_22-EEHC-SAG-L-00106
2015_22-EEHC_SAG-L-00106 3150A GIS busducts for OHL feeders phase 2(2)
Yes
18.02.2017
27.02.2017
Completed
2015_22-EEHC-SAG-L-00104; 2015_22-SAG-EEHC-L-00385; 2015_22-SAG-EEHC-L-00400
Yes
19.02.2017
24.02.2017
Completed
2015_22-SAG-OC_EEHC-L-00273; 2015_22-SAG-OC-L-00288
Yes Yes Yes Yes
26.02.2017 08.03.2017 15.03.2017 27.03.2017
06.03.2017 16.03.2017 22.03.2017 03.04.2017
Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00399; 2015_22-SAG-OC_EEHC-L-00280
Yes Yes No
27.03.2017 28.03.2017 29.03.2017
04.04.2017 05.04.2017
Completed Completed Completed
2015_22-SAG-EEHC-L-00405; 2015_22-SSM-OCSM_EEHC-L-00054 2015_22-SAG-OC_EEHC-L-00298
2015_22-EEHC-SAG-L-00111
2015_22-EEHC_SAG-L-00109 Re Readiness of 500 kV GIS Phase 2 Energization RRT for GTs 31, 32, 41 and 42 WG: EG10xx-SPO-EEHC-L-00033 Stand-by on the Fuel Gas Compressors 2015_22-EEHC_SAG-L-00111 Re Update ongoing investigations generator circuit breaker and main transformer of unit 41
Yes
03.04.2017
11.04.2017
Completed
2015_22-SAG-EEHC-L-00399; 2015_22-SAG-EEHC-L-00416
2015_22-EEHC-SAG-L-00110
2015_22-EEHC_SAG-L-00110 RTR Reiteration for Unit 31
Yes
04.04.2017
11.04.2017
Completed
2015_22-SAG-EEHC-L-00412; 2015_22-SAG-OC_EEHC-L-00286
2015_22-EEHC-SAG-L-00112
2015_22-EEHC_SAG-L-00112 Re: GT lift oil system
Yes
06.04.2017
14.04.2017
Completed
2015_22-EEHC-SAG-L-00110; 2015_22-SAG-EEHC-L-00412; 2015_22-SAG-EEHC-L-00413
2015_22-EEHC-SAG-E-00087 2015_22-EEHC_SAG-L-00107 Reports for Generator Circuit Breaker and Main Transformer of unit 41 Comments on Performance Test Procedures Gas Fuel Supply System-Redundancy Concept Burullus Project - Reliability Run for GTs 31,41 and 42
2015_22-EEHC-SAG-L-00107 2015_22-EEHC-SAG-E-00110 2015_22-EEHC-SAG-E-00111 2015_22-EEHC-SAG-E-00113 2015_22-EEHC-SAG-L-00109 2015_22-EEHC-SAG-E-00114 2015_22-EEHC-SAG-E-00115
10.08.2017
EG10xx-SPO-EEHC-L-00033
EG10xx-SPO-EEHC-L-00033 2015_22-EEHC_SSM-OCSM-L-00016
Page 4 of 4
Letter-No.(int.) 2015_22-SAG-EEHC-L-00131
Project: EG1019 MPR No.: 23
Correspondence List (SAG to Customer)
SIEMENS Subject water balance
Reply Req. Corr. Date No 27.01.2015
2015_22-SAG-EEHC-L-00001 2015_22-SAG-EEHC-L-00003 2015_22-SAG-EEHC-L-00004 2015_22-SAG-EEHC-L-00006 2015_22-SAG-EEHC-L-00002 2015_22-SAG-EEHC-L-00007 2015_22-SAG-EEHC-L-00010 2015_22-SAG-EEHC-L-00011 2015_22-SAG-EEHC-L-00016 2015_22-SAG-EEHC-L-00017 2015_22-SAG-EEHC-L-00020 2015_22-SAG-EEHC-L-00022 2015_22-SAG-EEHC-L-00009 2015_22-SAG-EEHC-L-00023 2015_22-SAG-EEHC-L-00026 2015_22-SAG-EEHC-L-00027 2015_22-SAG-EEHC-L-00028 2015_22-SAG-EEHC-L-00029 2015_22-SAG-EEHC-L-00030
Nomination of additional Sub-contractor Gas Turbine Systems - Enclosure 500kV GIS Switchyard - CT and VT calculation Required Data for Isolation Coordination Study Nomination of additional Sub-contractor Gas Turbine Systems - Battery Charger 500kV GIS Secondary System Documents Data of interconnected system 500kV Gas inlet data - re: meeting EEHC/GASCO/SAG Price Breakdown acc. to Appendix B1 of Contract Consortium Quality Manual Estimated gas consumption during commissioning Inspection and Test Plan, Gas Turbine 500kV-Gis 500 kV Outdoor Equipment Inspection Schedule Inspection and Test Plan, GT and DT transformer 500 kV switchgear, battery, charger, steel structures, overhead crane Agenda for GIS Meeting on Monday, 14.9.2015 500 kV GIS local control cubicle design
No Yes Yes No Yes Yes Yes No No No No No No Yes No No Yes No Yes
09.07.2015 13.07.2015 24.07.2015 27.07.2015 03.08.2015 05.08.2015 12.08.2015 19.08.2015 19.08.2015 20.08.2015 31.08.2015 01.09.2015 02.09.2015 02.09.2015 08.09.2015 10.09.2015 11.09.2015 11.09.2015 14.09.2015
2015_22-SAG-EEHC-L-00031 2015_22-SAG-EEHC-L-00032 2015_22-SAG-EEHC-L-00024 2015_22-SAG-EEHC-L-00035 2015_22-SAG-EEHC-L-00036 2015_22-SAG-EEHC-L-00037 2015_22-SAG-EEHC-L-00038 2015_22-SAG-EEHC-L-00040 2015_22-SAG-EEHC-L-00041 2015_22-SAG-EEHC-L-00042 2015_22-SAG-EEHC-L-00043
Minutes of Meeting, Approval of primary components 500 kV GIS, Protection panel front view Safety Design Concept Inspection and Test Plan, Steam Turbine HI and LP Telecommunication system DTS-0015, 0016 Temporary Coating of Heating Elements Retained remittance fees for 1st and 2nd advanced payment Appendix S Form notification - contact number for requirements department 500 kV switchgear, spare feeder bay =B23 Minutes of Meeting "Correspondance training - Fabasoft Cloud" on 2015-09-29 Inspection duration
No Yes No No Yes No Yes No Yes No No
14.09.2015 17.09.2015 18.09.2015 21.09.2015 23.09.2015 25.09.2015 30.09.2015 01.10.2015 02.10.2015 02.10.2015 05.10.2015
2015_22-SAG-EEHC-L-00044 2015_22-SAG-EEHC-L-00019
Secondary system, local control cubicle Contractual Clarification List Items 177 and 324 - Flow Measurements for Sulphur Heaters
Yes No
05.10.2015 08.10.2015
19.10.2015
Completed Completed
2015_22-SAG-EEHC-L-00045 2015_22-SAG-EEHC-L-00047 2015_22-SAG-EEHC-L-00048 2015_22-SAG-EEHC-L-00049 2015_22-SAG-EEHC-L-00056 2015_22-SAG-EEHC-L-00051 2015_22-SAG-EEHC-L-00033 2015_22-SAG-EEHC-L-00046 2015_22-SAG-EEHC-L-00052 2015_22-SAG-EEHC-L-00053 2015_22-SAG-EEHC-L-00054 2015_22-SAG-EEHC-L-00055 2015_22-SAG-EEHC-L-00057
Kone Crane Comments HV Equipment connection at Gantry Area SF6 to Air Bushing Specification 500kV GIS local control cubicle design Burullus Fishing Port - Transport Concept Assumptions for design Receiving Gantry 500 kV GIS, Telecommunication system 500KV switchgear, spare feeder bay = B23 Reminder Telecommunication, Letter 22-SAG-EEHC-L-00036 Nomination of additional suppliers Generator Transformer Monitoring 500kV Outdoor Equipment Re: Missed Transmittals and Correspondence
Yes Yes Yes Yes No Yes Yes Yes Yes Yes No Yes No
12.10.2015 13.10.2015 13.10.2015 13.10.2015 14.10.2015 15.10.2015 16.10.2015 16.10.2015 16.10.2015 16.10.2015 19.10.2015 19.10.2015 20.10.2015
19.10.2015 20.10.2015 20.10.2015 20.10.2015
Completed Completed Completed Completed Completed Completed Completed Sent Completed Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00058 2015_22-SAG-EEHC-L-00059
Clarification Supply of Sulphur Heaters Generator Monitoring
No No
20.10.2015 21.10.2015
Yes Yes No
22.10.2015 22.10.2015 22.10.2015
No Yes Yes
27.10.2015 28.10.2015 28.10.2015
2015_22-SAG-EEHC-L-00061 2015_22-SAG-EEHC-L-00062 2015_22-SAG-EEHC-L-00063 2015_22-SAG-EEHC-E-00001 2015_22-SAG-EEHC-L-00066 2015_22-SAG-EEHC-L-00067
10.08.2017
Letter-No.(ext.)
Comment to Client letter 2015_22-EEHC-SAG-L-0002, Battery and UPS, Specification Lead acid battery (DTS0055) Secondary system, local control cubicle Secondary interface 500 kV switchgear - power plant Re: EG1019 PM 2015_22-SAG-EEHC-L-00061 Comment to Client letter 2015_22-EEHC-SAG-L0002, Battery and UPS, Specification Lead acid battery (DTS0055) AC_DC Distribution Single lines, AC load Calculation 500 KV GIS local control cubicle design, Special tools
Target Date
20.07.2015 07.08.2015 17.08.2015 19.08.2015 26.08.2015
09.09.2015
25.09.2015 28.09.2015
01.10.2015
30.09.2015 07.10.2015 09.10.2015
22.10.2015 22.10.2015 22.10.2015 21.10.2015 29.10.2015 22.10.2015
Status Completed Completed Completed Completed Completed Sent Completed Completed Completed Completed Completed Completed Completed Completed Sent Completed Completed Completed Completed Completed Completed Sent Completed Completed Completed Completed Sent Completed Completed Completed Completed
Completed Completed
30.10.2015 29.10.2015
04.11.2015 04.11.2015
Completed Sent Completed Completed Sent Sent
Reference to 2015_22-EEHC-SAG-L-00034
2015_22-SAG-EEHC-L-00100
2015_22-SAG-EEHC-L-00017 2015_22-SAG-EEHC-L-00016
2015_22-EEHC-SAG-L-00001; 2015_22-SAG-EEHC-L-00055 2015_22-SAG-EEHC-L-00230 2015_22-SAG-EEHC-L-00052
2015_22-EEHC-SAG-L-00005 2015_22-EEHC-SAG-L-00002; 2015_22-SAG-EEHC-L-00061 2015_22-SAG-EEHC-L-00058 2015_22-EEHC-SAG-L-00002; 2015_22-SAG-EEHC-L-00061
2015_22-EEHC-SAG-L-00004 2015_22_EEHC_SAG-OC-L-00020
2015_22-EEHC-SAG-L-00006 2015_22-SAG-EEHC-L-00036 2015_22-EEHC-SAG-E-00008 2015_22-SAG-EEHC-L-00031 2015_22_EEHC_SAG-OC-E-00026 2015_22-EEHC-SAG-E-00006; 2015_22-SAG-EEHC-L-00019 2015_22-EEHC-SAG-E-00008 2015_22-EEHC-SAG-L-00002; 2015_22-SAG-EEHC-L-00044; 2015_22-SAG-EEHC-L-00045 2015_22-EEHC-SAG-L-00007
2015_22-EEHC-SAG-E-00009 2015_22-EEHC-SAG-T-000002 2015_22-EEHC-SAG-L-00010
Page 1 of 6
Letter-No.(int.) 2015_22-SAG-EEHC-L-00050 2015_22-SAG-EEHC-L-00065
Project: EG1019 MPR No.: 23
Correspondence List (SAG to Customer)
SIEMENS
Subject Inspection Schedule, update Inspection and Test Plan concerning Exhaust System
Reply Req. Corr. Date No 29.10.2015 Yes 29.10.2015
Target Date
2015_22-SAG-EEHC-L-00068 2015_22-SAG-EEHC-L-00069 2015_22-SAG-EEHC-L-00070 2015_22-SAG-EEHC-L-00071 2015_22-SAG-EEHC-L-00072
HV Equipment connection at Gantry Area, Reference lists Line Traps technical Data; DTS0059 Nomination of additional supplier Furniture for Central Control Room (CCR) Shipper`s own Container - Ownership Structures
Yes Yes Yes No Yes
29.10.2015 30.10.2015 30.10.2015 02.11.2015 03.11.2015
05.11.2015 06.11.2015 06.11.2015 11.11.2015
Completed Sent Completed Completed Completed
2015_22-SAG-EEHC-L-00073 2015_22-SAG-EEHC-L-00106 2015_22-SAG-EEHC-L-00074
Yes Yes Yes
03.11.2015 03.11.2015 04.11.2015
10.11.2015 17.12.2015 06.11.2015
Sent Sent Completed
2015_22-SAG-EEHC-L-00075 2015_22-SAG-EEHC-L-00076 2015_22-SAG-EEHC-L-00077 2015_22-SAG-EEHC-L-00078 2015_22-SAG-EEHC-L-00080 2015_22-SAG-EEHC-L-00082 2015_22-SAG-EEHC-L-00083 2015_22-SAG-EEHC-L-00084 2015_22-SAG-EEHC-L-00085 2015_22-SAG-EEHC-L-00086 2015_22-SAG-EEHC-L-00087
HV Equipment connection at Gantry Area, Reference List Tension Insulator Inspection and Test Plan concerning Exhaust System Assumptions for the design of the receiving gantry for Burullus PP Project Inspection and Test Plan concerning Exhaust System, Meeting with Eng. Fathy Moussa and Generator Expert Inspection Call for Gas Turbine Unit 31, Rotor Balancing, preliminary date Country of Origin HRSG Material Air intake filter clarifications Feeder =B23, local control cubuicle and secondary systems Generator Transformer Monitoring Generator rotor removal concept Electrical Single Line Diagram ITP Meeting HV Outdoor Equipment, Post Insulator Retained remittance fees for 1st and 2nd advance payment invoice
Yes Yes No No Yes No No No No Yes Yes
04.11.2015 05.11.2015 05.11.2015 10.11.2015 10.11.2015 12.11.2015 12.11.2015 12.11.2015 13.11.2015 13.11.2015 13.11.2015
11.11.2015 12.11.2015
Completed Sent Completed Completed Completed Completed Completed Completed Completed Completed Sent
2015_22-SAG-EEHC-L-00088
Assumptions for design of receiving Gantry
No
13.11.2015
2015_22-SAG-EEHC-L-00089 2015_22-SAG-EEHC-L-00091 2015_22-SAG-EEHC-L-00093 2015_22-SAG-EEHC-L-00094 2015_22-SAG-EEHC-L-00095 2015_22-SAG-EEHC-L-00096 2015_22-SAG-EEHC-L-00097 2015_22-SAG-EEHC-L-00092
Assumptions for design receiving Gantry Rev A 230VAC Inverter changed to Dual parallel redundant Nomination of new supplier Inspection Calls for HRSG Modules, Vessels Assumptions for design receiving gantry Rev A Experience list and certificates supplier Südkabel Local Control Cubicles, Approval Inspection and Test Plan for Generator and Generator Circuit Breaker, Inspection Schedule
Yes Yes No No Yes Yes No Yes
16.11.2015 16.11.2015 16.11.2015 16.11.2015 17.11.2015 18.11.2015 19.11.2015 23.11.2015
2015_22-SAG-EEHC-L-00098 2015_22-SAG-EEHC-L-00099 2015_22-SAG-EEHC-L-00100 2015_22-SAG-EEHC-L-00101 2015_22-SAG-EEHC-L-00102 2015_22-SAG-EEHC-L-00104 2015_22-SAG-EEHC-L-00105
Agenda Pre-Inspection Meeting of HRSG Modules, Vessels 500 kV GIS, Spare feeder bay =B23 Required Data for Isolation Coordination Study Laydown area for generator rotor Generator Transformer Monitoring Deemed approval of additional suppliers Re: Owner Required Letters
No No Yes No No No No
23.11.2015 24.11.2015 25.11.2015 25.11.2015 25.11.2015 25.11.2015 26.11.2015
2015_22-SAG-EEHC-L-00108 2015_22-SAG-EEHC-L-00109 2015_22-SAG-EEHC-L-00110 2015_22-SAG-EEHC-L-00090 2015_22-SAG-EEHC-L-00114 2015_22-SAG-EEHC-L-00115 2015_22-SAG-EEHC-L-00116 2015_22-SAG-EEHC-L-00117 2015_22-SAG-EEHC-L-00118 2015_22-SAG-EEHC-L-00103 2015_22-SAG-EEHC-L-00119 2015_22-SAG-EEHC-L-00120 2015_22-SAG-EEHC-L-00121 2015_22-SAG-EEHC-L-00122 2015_22-SAG-EEHC-L-00123
2015_22-SAG-EEHC-L-00108 Inspection Call for Gas Turbine Unit 31, Rotor Balancing, final date 11kV Commissioning power details Telecommunication Reply to Comments Base Design SCS Central Panels Design Criteria Receiving Gantry Base Design BCU Panels Comments to Electrical Single Line Diagram Nomination of additional supplier Answer to question regarding EEHC-SAG -L-00026 Air intake filter clarifications 2015_22-SAG-EEHC-L-00103 Invitation for FAT 500kV GIS, LCC and Surge Arrestors Nomination of additional supplier Water balance Protection Panels for Generator and Steam Turbine Connecting Burullus and New Capital 500kV Data for insulation coordination study
Yes No No Yes No No No Yes No Yes No No Yes Yes No
29.11.2015 01.12.2015 01.12.2015 04.12.2015 04.12.2015 04.12.2015 07.12.2015 07.12.2015 07.12.2015 08.12.2015 08.12.2015 09.12.2015 10.12.2015 10.12.2015 10.12.2015
2015_22-SAG-EEHC-L-00124
Cable Trays Specification, Overhead line conductor specification
No
10.12.2015
10.08.2017
Letter-No.(ext.)
04.11.2015
24.11.2015
20.11.2015 20.11.2015
Status Completed Completed
Completed
23.11.2015 23.11.2015
24.11.2015 22.11.2015 07.12.2015
09.12.2015
11.12.2015
10.12.2015
13.12.2015 20.12.2015
17.12.2015 16.12.2015
Completed Sent Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Sent Completed Completed Sent Completed Completed Completed Completed Completed Completed Completed Completed Completed Sent Completed
Reference to 2015_22-EEHC-SAG-T-000001 2015_22-EEHC-SAG-L-00009; 2015_22-SAG-EEHC-L-00073
2015_22-EEHC-SAG-L-00009; 2015_22-SAG-EEHC-L-00068 2015_22-EEHC-SAG-T-000001 2015_22-EEHC-SAG-E-00036 2015_22-EEHC-SAG-E-00013
2015_22-SAG-EEHC-L-00242 2015_22-EEHC-SAG-L-00012 2015_22-EEHC-SAG-L-00013 2015_22-EEHC-SAG-T-000003 2015_22-EEHC-SAG-L-00016
2015_22-EEHC-SAG-E-00038; 2015_22-SAG-EEHC-L-00089 2015_22-EEHC-SAG-E-00038; 2015_22-SAG-EEHC-L-00088; 2015_22-SAG-EEHC-L-00095
2015_22-SAG-EEHC-L-00089 2015_22-EEHC-SAG-L-00021 2015_22-EEHC-SAG-T-000004
2015_22-EEHC-SAG-L-00023 2015_22-SAG-EEHC-L-00004 2015_22-EEHC-SAG-L-00018 2015_22-EEHC-SAG-L-00020 2015_22-EEHC-SAG-L-00019
2015_22-EEHC-SAG-L-00024
2015_22-EEHC-SAG-L-00025 2015_22-EEHC-SAG-L-00026 2015_22-EEHC-SAG-L-00031 2015_22-EEHC-SAG-T-000005 2015_22-EEHC-SAG-E-00040 2015_22-EEHC-SAG-E-00041
Completed
Page 2 of 6
Letter-No.(int.) 2015_22-SAG-EEHC-L-00126 2015_22-SAG-EEHC-L-00127 2015_22-SAG-EEHC-L-00125 2015_22-SAG-EEHC-L-00130 2015_22-SAG-EEHC-L-00132 2015_22-SAG-EEHC-L-00128 2015_22-SAG-EEHC-L-00129 2015_22-SAG-EEHC-L-00133 2015_22-SAG-EEHC-L-00134 2015_22-SAG-EEHC-L-00135 2015_22-SAG-EEHC-L-00136 2015_22-SAG-EEHC-L-00137 2015_22-SAG-EEHC-L-00140 2015_22-SAG-EEHC-L-00141 2015_22-SAG-EEHC-L-00142 2015_22-SAG-EEHC-L-00143 2015_22-SAG-EEHC-L-00144 2015_22-SAG-EEHC-L-00146 2015_22-SAG-EEHC-L-00147 2015_22-SAG-EEHC-L-00148 2015_22-SAG-EEHC-L-00149 2015_22-SAG-EEHC-L-00150 2015_22-SAG-EEHC-L-00145 2015_22-SAG-EEHC-L-00151 2015_22-SAG-EEHC-L-00152 2015_22-SAG-EEHC-L-00153 2015_22-SAG-EEHC-L-00154 2015_22-SAG-EEHC-L-00155 2015_22-SAG-EEHC-L-00156 2015_22-SAG-EEHC-L-00157 2015_22-SAG-EEHC-L-00158 2015_22-SAG-EEHC-L-00159 2015_22-SAG-EEHC-L-00160 2015_22-SAG-EEHC-L-00161 2015_22-SAG-EEHC-L-00162 2015_22-SAG-EEHC-L-00163 2015_22-SAG-EEHC-L-00164 2015_22-SAG-EEHC-L-00165 2015_22-SAG-EEHC-L-00166 2015_22-SAG-EEHC-L-00167 2015_22-SAG-EEHC-L-00168 2015_22-SAG-EEHC-L-00169 2015_22-SAG-EEHC-L-00170 2015_22-SAG-EEHC-L-00173 2015_22-SAG-EEHC-L-00174 2015_22-SAG-EEHC-L-00175 2015_22-SAG-EEHC-L-00177 2015_22-SAG-EEHC-L-00178 2015_22-SAG-EEHC-L-00180 2015_22-SAG-EEHC-L-00182 2015_22-SAG-EEHC-L-00184 2015_22-SAG-EEHC-L-00185 2015_22-SAG-EEHC-L-00186 2015_22-SAG-EEHC-L-00176 2015_22-SAG-EEHC-L-00187 2015_22-SAG-EEHC-L-00188 2015_22-SAG-EEHC-L-00368 2015_22-SAG-EEHC-L-00190 2015_22-SAG-EEHC-L-00189
10.08.2017
Project: EG1019 MPR No.: 23
Correspondence List (SAG to Customer)
SIEMENS Letter-No.(ext.)
Subject 500 kV GIS, Spare feeder bay =B23 Nomination of new supplier Inspection call CCVT and CVT, 500kV Inspection Call, Geno Unit 41 preliminary, gas turbine 31 prel, Invitation for Surge Arrestors Inspection Schedule Inspection Calls for HRSG Modules, Vessels, confirmed dates Inspection call, auxiliary transformer BBT prel, HRSG non pressure part - PIM 2015_22- EEHC-SAG -T-000014 I&C DCS Cabinet Overview BCU and HMI Typical screen pictures RE: EEHC-SAG -T-000007 IEEE AVR / PSS Model Descriptions Invitation Letters for FAT Surge Arrestors Berlin Telecommunication, DPL2 values Nomination of additional supplier - VAM Enduser certificate for ethernet routers Generators and Unit Transformers Ratings Inspection notification, Geno 41 final, diverter damper prel, SCS and DCS Signal list Inspection notification, BAT prel, HRSG main steel - pre inspection meetin final, Fuel Gas Analysis for the Performance Tests SCS Functional Design Specification ITP Battery Chargers and Inverter Re Issues of debate
Reply Req. No No Yes Yes No Yes No Yes No Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes No No No
Corr. Date 11.12.2015 14.12.2015 15.12.2015 18.12.2015 21.12.2015 22.12.2015 22.12.2015 22.12.2015 22.12.2015 22.12.2015 22.12.2015 23.12.2015 04.01.2016 04.01.2016 05.01.2016 06.01.2016 07.01.2016 08.01.2016 08.01.2016 11.01.2016 11.01.2016 11.01.2016 12.01.2016
Target Date
Spare Part List BoP (SAG scope of delivery) EETC 500 kV Transmission Lines Projects Frequency bandwidth for Burullus DPLC1 and DPLC2 Inspection call, Gasturbine 31 update prel, main transformer final, RE: P&IDs for Fuel Gas System and Fuel Gas Compressor Gas turbine rotor de-stacking Nomination of additional suppliers Inspection and Test Plan concerning SFC-SEE equipment Deemed approval of new Subcontractor Inspection Call, main transformer 41/42 prel Inspection Schedule P&IDs Water/Steam Cycle and Cooling Change in Rating from 2000A to 3150A for the overhead line Reply Protection Panels for Generator and Steam Turbine Inspection call, GIS, Battery charger & inverter, SCS & BCP, auxiliary transformer 41,42 final Auxiliary system P&IDs for GHC, GM and QFB Inspection call, bypass stack prel, P&IDs Water-Steam cycle and Cooling water systems EETC 500 kV Transmission Lines Projects Inspection call, Geno 42 prel P&IDs watersteam cycle and cooling water systems Reply SCS Properties Inspection call, MV Switchgear final Inspection call, Geno 32 prel Inspection and Test Plan for battery Inspection schedule, update DCS signal list to load dispatch center SF6 Air Bushing Specification 3150A P&lDs for Fuel Gas system and Fuel Gas Compressor Inspection call, MV switchgear 42BBA final, LV Swichgear 00BHA final, LV transformer 00BHT final and 42BFT final Inspection and Test Plan concerning Feed water pump and HRSG Inspection call, diverter damper 41 prel, GIS Telecom (DPLC/Teleprotection) prel, GIS Telecom (SDH/MUX) prel, Fuel gas analysis reply 2015_22-EEHC_SAG-L-00098 Difference of GTG Type Inspection call, Geno 32 final, main transfomer 41+42 prel, auxiliary transformer 31+32 prel Inspection Call Generator Unit 31/42 - Preliminary
No No Yes Yes No No Yes No No Yes No No No No Yes Yes Yes Yes Yes Yes No No Yes Yes No No Yes Yes No
12.01.2016 12.01.2016 12.01.2016 12.01.2016 13.01.2016 13.01.2016 13.01.2016 13.01.2016 14.01.2016 14.01.2016 14.01.2016 14.01.2016 14.01.2016 15.01.2016 18.01.2016 18.01.2016 19.01.2016 19.01.2016 19.01.2016 20.01.2016 22.01.2016 26.01.2016 26.01.2016 27.01.2016 27.01.2016 28.01.2016 29.01.2016 29.01.2016 29.01.2016
Yes No
01.02.2016 02.02.2016
08.02.2016
Yes Yes No Yes Yes
02.02.2016 02.02.2016 02.02.2016 04.02.2016 05.02.2016
08.02.2016 09.02.2016
22.12.2015 25.12.2015 30.12.2015 29.12.2015 29.12.2015 30.12.2015 11.01.2016 11.01.2016 12.01.2016 13.01.2016 14.01.2016 15.01.2016 15.01.2016 18.01.2016
19.01.2016 19.01.2016
19.01.2016
21.01.2016
25.01.2016 08.03.2016 26.01.2016 23.02.2016 26.01.2016 25.01.2016
02.02.2016 03.02.2016
05.02.2016 05.02.2016
11.02.2016 12.02.2016
Status Completed Completed Completed Sent Completed Sent Completed Sent Completed Completed Completed Completed Sent Sent Sent Sent Sent Sent Sent Sent Completed Completed Completed Completed Completed Sent Sent Completed Completed Completed Completed Completed Sent Completed Completed Completed Completed Sent Sent Sent Sent Sent Sent Completed Completed Sent Sent Completed Completed Sent Completed Completed Sent Completed Sent Sent Completed Sent Sent
Reference to 2015_22-EEHC-SAG-L-00028
2015_22-EEHC-SAG-L-00035 2015_22-EEHC-SAG-L-00030
2015_22-EEHC-SAG-T-000014 2015_22-EEHC-SAG-T-000007 2015_22-EEHC-SAG-E-00053 2015_22-EEHC-SAG-E-00052 2015_22-SAG-EEHC-L-00159
2015_22-SAG-EEHC-L-00196
2015_22-EEHC-SAG-L-00039 2015_22_EEHC_SAG-OC-L-00057; 2015_22-OC_EEHC-L-00058 2015_22-SAG-EEHC-L-00169 2015_22-EEHC-SAG-E-00052 2015_22-EEHC-SAG-T-000012
2015_22-EEHC-SAG-T-000011 2015_22-SAG-EEHC-L-00141 2015_22-EEHC-SAG-L-00037 2015_22-EEHC-SAG-T-000017 2015_22-EEHC-SAG-L-00036 2015_22-EEHC-SAG-T-000013 2015_22-EEHC-SAG-T-000016 2015_22-SAG-EEHC-L-00152 2015_22-EEHC-SAG-T-000020 2015_22-EEHC-SAG-L-00044
2015_22-EEHC-SAG-T-000010 2015_22-EEHC-SAG-L-00040 2015_22-EEHC-SAG-L-00043
2015_22-EEHC-SAG-T-000018
2015_22-EEHC-SAG-L-00098
Page 3 of 6
Letter-No.(int.) 2015_22-SAG-EEHC-L-00191 2015_22-SAG-EEHC-L-00192 2015_22-SAG-EEHC-L-00193 2015_22-SAG-EEHC-L-00197 2015_22-SAG-EEHC-L-00199 2015_22-SAG-EEHC-L-00200 2015_22-SAG-EEHC-L-00172 2015_22-SAG-EEHC-L-00204 2015_22-SAG-EEHC-L-00205 2015_22-SAG-EEHC-L-00194 2015_22-SAG-EEHC-L-00183 2015_22-SAG-EEHC-L-00202 2015_22-SAG-EEHC-L-00208 2015_22-SAG-EEHC-L-00210 2015_22-SAG-EEHC-L-00196 2015_22-SAG-EEHC-L-00207 2015_22-SAG-EEHC-L-00211 2015_22-SAG-EEHC-L-00212 2015_22-SAG-EEHC-L-00213 2015_22-SAG-EEHC-L-00214 2015_22-SAG-EEHC-L-00217 2015_22-SAG-EEHC-L-00218 2015_22-SAG-EEHC-L-00220 2015_22-SAG-EEHC-L-00221 2015_22-SAG-EEHC-L-00223 2015_22-SAG-EEHC-L-00224 2015_22-SAG-EEHC-L-00225 2015_22-SAG-EEHC-L-00227 2015_22-SAG-EEHC-L-00228 2015_22-SAG-EEHC-L-00206 2015_22-SAG-EEHC-L-00229 2015_22-SAG-EEHC-L-00230 2015_22-SAG-EEHC-L-00231 2015_22-SAG-EEHC-L-00226 2015_22-SAG-EEHC-L-00232 2015_22-SAG-EEHC-L-00234 2015_22-SAG-EEHC-L-00236 2015_22-SAG-EEHC-L-00235 2015_22-SAG-EEHC-L-00203 2015_22-SAG-EEHC-L-00241
Project: EG1019 MPR No.: 23
Correspondence List (SAG to Customer)
SIEMENS Letter-No.(ext.)
Subject Water Steam Cycle Meeting Summary Line Traps, Change of Blocking Bandwidth Inspection Invitation Bypass unit 42 - Final Inspection Inspection call, MV switchgear 31-32 final, Geno 32 prel Minutes of Meeting 160216, signal list, overhead line feeders Fuel Oil Analysis Data Sheet Piping and Instrumentation Diagram (P&ID) of HRSG P&IDs for Fuel Gas system and Fuel Gas Compressor Gland steam condenser SCS functional design specification Clarification concerning Emergency Diesel Concept - Technical Meeting on 17.02.2016 Fire Figthing System P&ID Inspection call, bypass 41 prel reply: 2015_22- EEHC-SAG -T-000015 GTG OEMs documents (Part 1) fuel gas analysis for the performance tests Forward notification for EEHC-SAG-T-000022 SCS Commination Base Design Rev A, SCS Functional Design Rev A Change of Band Width for Line Traps Protection settings template Actual Drawings for CVT and CCVT General Alarm Panel Rev B Aviation warning light system for HRSG Inspection call, BTA battery prel., MBR damper 31 prel, Inspection call, HRSG modules - hydro- prel, bypass 32 prel Inspection call, Generator circuit breaker 42-41-32-31 preliminary 500 kV overhead line connections, meeting 4.4.2016 Actual Signal Lists re: 2015_22-EEHC-SAG-E-00070: Estimated Gas Consumption during Commissioning Re: Fuel Gas analysis Inspection Notification of reduced amount of inspection Re Diesel Generator Concept Safety Design Concept Exhaust Bypass Stack GA drawing, P&ID, Signal RE: SGC Fire Fire Fighting System P&ID
Reply Req. Yes No Yes Yes Yes Yes No No No No Yes No Yes No Yes No No No No No No Yes Yes Yes Yes No No No Yes No Yes No No No
Corr. Date 07.02.2016 09.02.2016 09.02.2016 16.02.2016 18.02.2016 18.02.2016 22.02.2016 24.02.2016 24.02.2016 25.02.2016 29.02.2016 29.02.2016 01.03.2016 04.03.2016 07.03.2016 07.03.2016 10.03.2016 10.03.2016 10.03.2016 10.03.2016 14.03.2016 22.03.2016 24.03.2016 24.03.2016 29.03.2016 30.03.2016 30.03.2016 01.04.2016 01.04.2016 05.04.2016 05.04.2016 06.04.2016 06.04.2016 08.04.2016
2015_22-EEHC-SAG-L-00046 Air intake filter clarifications Minutes of Meeting 4.4.2016, 500 kV overhead line connections, back energizing 500kV Overheadline/ Loadforecast for Commissioning Diesel Generator Concept Water Steam Cycle - PAC pump documents Burullus change in key personal Siemens site manager
No Yes No No No No
08.04.2016 08.04.2016 15.04.2016 18.04.2016 26.04.2016 26.04.2016
Target Date 08.03.2016 16.02.2016 23.02.2016 25.02.2016 25.02.2016
10.03.2016 08.03.2016 14.03.2016
29.03.2016 31.03.2016 31.03.2016 05.04.2016
18.04.2016 12.04.2016
15.04.2016
2015_22-SAG-EEHC-L-00242 2015_22-SAG-EEHC-L-00243 2015_22-SAG-EEHC-L-00244 2015_22-SAG-EEHC-L-00245 2015_22-SAG-EEHC-L-00247
Reply: Air Intake Filter Clarifications 2 NECC letter, signal list Starting System Transformers Shipment Eye Wash for Battery Room - Clarification item 227 500 kV network configuration
No Yes Yes Yes Yes
27.04.2016 28.04.2016 04.05.2016 06.05.2016 13.05.2016
2015_22-SAG-EEHC-L-00250 2015_22-SAG-EEHC-L-00251 2015_22-SAG-EEHC-L-00252 2015_22-SAG-EEHC-L-00253 2015_22-SAG-EEHC-L-00254
Factory Tests Water Steam Cycle-PAC pump documents Inspection schedule, Inspection call gas turbine Signal list, meeting with NECC Meeting on network configuration, telecommunication
Yes No Yes Yes Yes
20.05.2016 25.05.2016 01.06.2016 01.06.2016 01.06.2016
27.05.2016
2015_22-SAG-EEHC-L-00256 2015_22-SAG-EEHC-L-00258 2015_22-SAG-EEHC-L-00259 2015_22-SAG-EEHC-L-00260 2015_22-SAG-EEHC-L-00261 2015_22-SAG-EEHC-L-00233 2015_22-SAG-EEHC-L-00262
Spare Parts Offer Inspection call final acceptance XKA, Inspecton schedule Inspection Call for Gas Turbine 21 Notice of Force Majeure - Indonesian Factory Strike QST Documents RE: GT OEMs Documents (Part1) Nominees for Factory Tests
Yes Yes No No No No No
06.06.2016 13.06.2016 14.06.2016 14.06.2016 15.06.2016 17.06.2016 17.06.2016
20.06.2016 20.06.2016
10.08.2017
15.05.2016 06.05.2016 20.05.2016 30.05.2016
08.06.2016 08.06.2016 08.06.2016
Status Completed Completed Sent Sent Sent Sent Completed Completed Completed Completed Sent Completed Sent Completed Completed Completed Completed Completed Completed Completed Completed Sent Sent Sent Sent Completed Completed Completed Sent Completed Sent Completed Completed Completed Completed Sent Completed Completed Completed Completed
Completed Sent Completed Sent Sent Sent Completed Sent Sent Sent Completed Sent Completed Completed Completed Completed Completed
Reference to 2015_22-EEHC-SAG-L-00045
2015_22-EEHC-SAG-T-000019 2015_22-EEHC-SAG-L-00050 2015_22-EEHC-SAG-T-000021 2015_22-EEHC-SAG-L-00042 2015_22-EEHC-SAG-T-000023 2015_22-EEHC-SAG-T-000015 2015_22-SAG-EEHC-L-00148 2015_22-EEHC-SAG-T-000022
2015_22-SAG-OC_EEHC-L-00152
2015_22-EEHC-SAG-E-00070 2015_22-EEHC-SAG-L-00047 2015_22-SAG-OC_EEHC-L-00123 2015_22-EEHC-SAG-L-00054 2015_22-SAG-EEHC-L-00024 2015_22-EEHC-SAG-T-000009 2015_22-EEHC-SAG-L-00055 2015_22-EEHC-SAG-L-00046; 2015_22-SAG-EEHC-L-00242
2015_22-EEHC-SAG-L-00058 2015_22-EEHC-SAG-L-00048 2015_22-EEHC-SAG-L-00059; 2015_22-SAG-EEHC-L-00078; 2015_22-SAG-EEHC-L-00232 2015_22-EEHC-SAG-L-00063
2015_22_EEHC_SAG-OC-L-00145; 2015_22-SAG-EEHC-L-00252 2015_22-EEHC-SAG-L-00061 2015_22-SAG-EEHC-L-00250 2015_22-EEHC-SAG-L-00065 2015_22-SAG-EEHC-L-00299; 2015_22-SAG-EEHC-L-00364 2015_22-EEHC-SAG-L-00068 2015_22-EEHC-SAG-L-00069 2015_22-EEHC-SAG-L-00057 2015_22-EEHC-SAG-L-00066
Page 4 of 6
Letter-No.(int.)
Project: EG1019 MPR No.: 23
Correspondence List (SAG to Customer)
SIEMENS Subject
Reply Req. Corr. Date
2015_22-SAG-EEHC-L-00263 2015_22-SAG-EEHC-L-00265 2015_22-SAG-EEHC-L-00266 2015_22-SAG-EEHC-L-00269 2015_22-SAG-EEHC-L-00264 2015_22-SAG-EEHC-L-00270 2015_22-SAG-EEHC-L-00272 2015_22-SAG-EEHC-L-00274 2015_22-SAG-EEHC-L-00275 2015_22-SAG-EEHC-L-00280 2015_22-SAG-EEHC-L-00282
RE: 2015_22-EEHC-SAG-T-000024 P&I Diagram Instrument Air System Unit 42 Inspection schedule, Inspection call gas turbine - update Factory Inspection, Visa application Insepction call, XKA Emergency Diesel Generator Documentation Quantities Inspection call, gas turbine Temporary setting of distance relays Burulls - Abu Quir Signal list, protection signals Steam Turbine Crane Fire and Explosion Protection Concept Setting of protection relays for outgoing circuits
No No No No Yes No No Yes No No Yes
17.06.2016 21.06.2016 22.06.2016 24.06.2016 27.06.2016 27.06.2016 27.06.2016 27.06.2016 29.06.2016 07.07.2016 07.07.2016
2015_22-SAG-EEHC-L-00278 2015_22-SAG-EEHC-L-00283 2015_22-SAG-EEHC-L-00276 2015_22-SAG-EEHC-L-00285
Connection and telecommunication for 500 kV GIS equipment Burullus Inspection call, 21 BBT Aux Transformer, 20MKA Generator Factory Inspection Test_Travel Arrangements Inspection call, final, gas turbine, emergency diesel
Yes No Yes No
08.07.2016 11.07.2016 12.07.2016 18.07.2016
2015_22-SAG-EEHC-L-00284 2015_22-SAG-EEHC-L-00286 2015_22-SAG-EEHC-L-00287 2015_22-SAG-EEHC-L-00288
Inspection call, 21BBT Auxiliary Transformer, invitation letters Notice of Force Majeure - Typhoons in Asia Inspection call, PCC, Inspection schedule Notice of Force Majeure - Floods in China
No No No No
19.07.2016 19.07.2016 20.07.2016 20.07.2016
Completed Completed Completed Completed
2015_22-SAG-EEHC-L-00290 2015_22-SAG-EEHC-L-00291 2015_22-SAG-EEHC-L-00292 2015_22-SAG-EEHC-L-00294 2015_22-SAG-EEHC-L-00295 2015_22-SAG-EEHC-L-00297
Inspection call, aux. transformer BBT, inspection schedule, invitation letters PCC Social Insurance Invitation letters for 21BBT Auxiliary Transformer Generator protection signals for NECC Notice of Force Majeure - Coup Attempt in Turkey HV grid connection
No Yes No No No Yes
21.07.2016 22.07.2016 26.07.2016 29.07.2016 03.08.2016 04.08.2016
11.08.2016
Completed Sent Completed Completed Completed Sent
2015_22-SAG-EEHC-L-00299 2015_22-SAG-EEHC-L-00302
Spare Parts Offer Permission to export fuel gas sample bottle
No Yes
05.08.2016 09.08.2016
23.08.2016
Completed Sent
2015_22-SAG-EEHC-L-00268 2015_22-SAG-EEHC-L-00293 2015_22-SAG-EEHC-L-00303 2015_22-SAG-EEHC-L-00304 2015_22-SAG-EEHC-L-00307 2015_22-SAG-EEHC-L-00309 2015_22-SAG-EEHC-L-00296 2015_22-SAG-EEHC-L-00313
Gantry construction required for the 500kV Burullus/ Samanoid Transmission line Fire and Explosion Protection Concept Invoice Documentation Gas Pressure Reducing Station Parameters for SCS System Inspection call, Geno 20MKA, revision1 Response to Letter 2015_22_EEHC-SAG-L-00081 Vibration Protection Inspection call 20MKA, Generator, update
No No No Yes No No No No
10.08.2016 10.08.2016 18.08.2016 19.08.2016 24.08.2016 25.08.2016 31.08.2016 02.09.2016
2015_22-SAG-EEHC-L-00314 2015_22-SAG-EEHC-L-00315 2015_22-SAG-EEHC-L-00317
MoM Connection and Telecommunication for 500kV GIS Burullus Absence of General Project Manager Re: Collective Notes - general layout/ air intake
Yes No No
06.09.2016 08.09.2016 09.09.2016
2015_22-SAG-EEHC-L-00318 2015_22-SAG-EEHC-L-00319 2015_22-SAG-EEHC-L-00321 2015_22-SAG-EEHC-L-00322
Re - Collective Notes - single line diagram for generator and transformer protection Re - Collective Notes - distance between cable trays XKA, test report for witness test Re: Collective Notes - Access to roofs for maintenance
No No No No
09.09.2016 09.09.2016 09.09.2016 09.09.2016
2015_22-SAG-EEHC-L-00325 2015_22-SAG-EEHC-L-00327 2015_22-SAG-EEHC-L-00329
Inspection call, 10BAT main transformer, update schedule Telecommunication, protection relay settings Re - collective notes - cable tray distance in GIS building
Yes No No
22.09.2016 22.09.2016 26.09.2016
2015_22-SAG-EEHC-L-00333 2015_22-SAG-EEHC-L-00334
Siemens AG Spare Parts Offer for BOP recommended for 2 years COMBINED CYCLE operation Fuel consumption during commissioning
No No
06.10.2016 06.10.2016
2015_22-SAG-EEHC-L-00337 2015_22-SAG-EEHC-L-00330 2015_22-SAG-EEHC-L-00339
Spare Parts Offer Permission to export fuel gas sample bottle Inspecion call, revision transformer BAT, PAC pump, update inspection schedule
Yes Yes No
13.10.2016 14.10.2016 17.10.2016
10.08.2017
Letter-No.(ext.)
Target Date
02.07.2016
04.07.2016
21.07.2016 14.07.2016 17.07.2016
29.07.2016
26.08.2016
12.09.2016
Status
Reference to
Completed Completed Sent Completed Completed Completed Completed Sent Completed Completed Sent
2015_22-EEHC-SAG-T-000024
Sent Completed Sent Completed
Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
29.09.2016
2015_22-EEHC-SAG-L-00073 2015_22-EEHC-SAG-L-00065 2015_22_EEHC_SAG-OC-L-00159 2015_22-EEHC-SAG-L-00060 2015_22-EEHC-SAG-L-00074
Sent Completed Completed
2015_22-EEHC-SAG-L-00076; 2015_22-EEHC-SAG-L-00077
2015_22-EEHC-SAG-L-00078; 2015_22-EEHC-SAG-L-00079 2015_22-EEHC-SAG-L-00077 2015_22-EEHC-SAG-L-00080
2015_22-SAG-EEHC-L-00256; 2015_22-SAG-EEHC-L-00364 2015_22-EEHC-SAG-L-00070; 2015_22-EEHC-SAG-L-00072; 2015_22-SAG-OC_EEHC-L-00179 2015_22-EEHC-SAG-L-00082 2015_22_EEHC_SAG-OC-L-00185
2015_22-EEHC-SAG-L-00081
2015_22_EEHC_SAG-OC-L-00190 2015_22_EEHC_SAG-OC-L-00190 2015_22_EEHC_SAG-OC-L-00190 2015_22_EEHC_SAG-OC-L-00190
2015_22-EEHC-SAG-L-00083 2015_22-OC_EEHC-L-00190
Completed Completed 20.10.2016 21.10.2016
Completed Sent Completed
2015_22-EEHC-SAG-L-00089; 2015_22-SAG-EEHC-L-00364 2015_22-EEHC-SAG-L-00084
Page 5 of 6
Letter-No.(int.) 2015_22-SAG-EEHC-L-00328 2015_22-SAG-EEHC-L-00338 2015_22-SAG-EEHC-L-00335 2015_22-SAG-EEHC-L-00341 2015_22-SAG-EEHC-L-00342 2015_22-SAG-EEHC-L-00344 2015_22-SAG-EEHC-L-00345 2015_22-SAG-EEHC-L-00347 2015_22-SAG-EEHC-L-00349 2015_22-SAG-EEHC-L-00351 2015_22-SAG-EEHC-L-00352 2015_22-SAG-EEHC-L-00353 2015_22-SAG-EEHC-L-00355 2015_22-SAG-EEHC-L-00356 2015_22-SAG-EEHC-L-00357 2015_22-SAG-EEHC-L-00343 2015_22-SAG-EEHC-L-00358
Project: EG1019 MPR No.: 23
Correspondence List (SAG to Customer)
SIEMENS Letter-No.(ext.)
Subject Floods in China Notice of Force Majeure - Change in China Transportation Regulation Surge Arrestor in Generator Circuit Breaker Energization Sequence 500kV GIS Phase 1 Change of Key Personal Siemens Recommended Spare Parts for two years operation acc. to Volume II Section 0.9 Inspection call, PAC pump rev1, Change of Key Personnel_Contact Details of Mr. Huebinger Procedure for back energizing 500 kV GIS Phase 1 Energization Nominee for PAC Pump Inspection, invitation letter Documentation Quantities GIS - Onsite Operation and Maintenance Training Invitation letter and hotel reservation for BAT inspection RE: Commissioning Procedures and Schedule 500kV Cables Connecting Step-Up Transformer to 500kV GIS Inspection call PAC pump update, inspection schedule
Reply Req. No No No No No No No No Yes No No Yes Yes No No No No
Corr. Date 18.10.2016 18.10.2016 19.10.2016 24.10.2016 26.10.2016 27.10.2016 27.10.2016 01.11.2016 01.11.2016 03.11.2016 04.11.2016 07.11.2016 08.11.2016 10.11.2016 14.11.2016 17.11.2016 17.11.2016
2015_22-SAG-EEHC-L-00364 2015_22-SAG-EEHC-L-00366 2015_22-SAG-EEHC-L-00367 2015_22-SAG-EEHC-L-00370 2015_22-SAG-EEHC-L-00372
Spare Parts Offer Inspection call 11MB gasturbine and retest PAC pump, update inspection schedule performance tests of main circulating pumps Inspection call, PAC pump, Inspection call PAC pump Rev1
No Yes No Yes Yes
17.12.2016 23.12.2016 23.12.2016 05.01.2017 10.01.2017
2015_22-SAG-EEHC-L-00374 2015_22-SAG-EEHC-L-00377 2015_22-SAG-EEHC-L-00379 2015_22-SAG-EEHC-L-00380 2015_22-SAG-EEHC-L-00385 2015_22-SAG-EEHC-L-00336 2015_22-SAG-EEHC-L-00391 2015_22-SAG-EEHC-L-00392 2015_22-SAG-EEHC-L-00395 2015_22-SAG-EEHC-L-00396 2015_22-SAG-EEHC-L-00397
3150 A GIS busducts for OHL feeders phase 2 Inspection test main circulating water pumps PAC Inspection call, LP steam turbine 500 kV GIS, MOM 22.1.2017, OPGW, Shutdowns, HV test plan phase 2 3150A GIS busducts for OHL feeders phase 2 NCR-I&C-001 Location of HMI Equipment Invitation letter for LP Steam Turbine 30 Inspection 3150 A GIS busduct for OHL Feeders Phase 2 Inspection call, Steam turbine Unit 30, final 41BAT Buchholz relay operation after flashover inside HV bushing turret Inspection call, Generator circuit breaker
No No Yes No No No No No Yes No Yes
12.01.2017 20.01.2017 24.01.2017 25.01.2017 31.01.2017 01.02.2017 15.02.2017 17.02.2017 22.02.2017 27.02.2017 03.03.2017
10.08.2017
Target Date
02.11.2016
14.11.2016 15.11.2016
30.12.2016 12.01.2017 17.01.2017
31.01.2017
01.03.2017 10.03.2017
Status Completed Completed Completed Completed Completed Completed Completed Completed Sent Completed Completed Completed Sent Completed Completed Completed Completed
Completed Sent Completed Sent Sent Completed Completed Sent Completed Completed Completed Completed Completed Sent Completed Sent
Reference to 2015_22-EEHC_SAG-OC-L-00199 2015_22-EEHC-SAG-L-00088
2015_22_EEHC_SAG-OC-L-00216 2015_22-EEHC-SAG-L-00094 2015_22-EEHC-SAG-L-00075
2015_22_EEHC_SAG-OC-L-00217 2015_22-EEHC-SAG-E-00079 2015_22-EEHC-SAG-L-00089; 2015_22-EEHC-SAG-L-00093; 2015_22-SAG-EEHC-L-00256; 2015_22-SAG-EEHC-L-00299; 2015_22-SAG-EEHC-L-00337
2015_22-SAG-OC_EEHC-L-00068; 2015_22-SAG-OC_EEHC-L-00072
2015_22-EEHC-SAG-L-00104 2015_22-EEHC-SAG-L-00105 2015_22-EEHC-SAG-E-00085
Page 6 of 6
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
A 4. DTL status
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
Product Data Sheet Calibration pot Arrangement drawing Dosing System for Ammonia Circuit and terminal diagram Dosing System for Ammonia Product Data Sheet Warning ligth & horn Product Data Sheet Chemical vapour lock Material Safety Data sheet Dosing Station for Ammonia Operation Instruction Dosing pump Operation Instruction Split Air Conditioner Operation Instruction Dosing pump Operation Instruction Pulsation damper Operation Instruction Overflow Protection Operation Instruction Pressure reducing valve Operation Instruction Capacitive level switch Operation Instruction Process controler Commissioning Clearance Certificate Dosing Station for Ammonia Checklist M01- System Check QCD Checklist M02- Storage Tank 10/20/30QCD10BB001 Checklist M07- Dosing pump XXQCDXXAP001 Dosing System for Ammonia Multi-Shaft Benson type Product Data Sheet Calibration pot Product Data Sheet Ball valve Product Data Sheet Warning ligth & horn Product Data Sheet Chemical vapour lock Operation Instruction Dosing pump Operation Instruction Anchor bolts Operation Instruction Split Air Conditioner Operation Instruction Dosing pump Operation Instruction Pulsation damper Operation Instruction Overflow Protection Operation Instruction Pressure reducing valve Operation Instruction Capacitive level switch
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988
2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03
449719891 -
Operation Instruction Process controler
FR
INFO
2015_22-SAG-EEHC-T-000988
2017-07-03
EG1019-10LCA-MBD120-462034 EG1019-10LCA-MQC010-462035 EG1019-10QCL-&MTB010-445105 EG1019-40QCL-&EFS010-445209
446719252 446719269 446390598 448001973
Pump - Quality Documentation Pump Set - EC Declaration Arrangement drawing Dosing System for Oxygen Circuit and terminal diagram Dosing Station for Oxygen
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-000991 2015_22-SAG-EEHC-T-000991 2015_22-SAG-EEHC-T-000992 2015_22-SAG-EEHC-T-000992
2017-07-03 2017-07-03 2017-07-03 2017-07-03
&MDA020
EG1019-QCL-&MDA020-445213
448002024 -
Material Safety Data sheet Dosing Station for Oxygen
FR
INFO
2015_22-SAG-EEHC-T-000992
2017-07-03
&MDC010 &MFB030 &MDC010 &MDC010 &MDC010
EG1019-QCL-&MDC010-445239 EG1019-40QCL10-&MFB030-445103 EG1019-QCL-&MDC010-445267 EG1019-QCL-&MDC010-445270 EG1019-QCL-&MDC010-445239
448002253 500187188 448002543 448002574 448002253
Operation Instruction Compression fitting Dosing System for Oxygen Operation Instruction Mass Flow Controller Operation Instruction Pressure gauge with contact Operation Instruction Compression fitting
FR FR FR FR FR
INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-000992 2015_22-SAG-EEHC-T-000992 2015_22-SAG-EEHC-T-000993 2015_22-SAG-EEHC-T-000993 2015_22-SAG-EEHC-T-000993
2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03
&MDC010 &MDC010
EG1019-QCL-&MDC010-445265 EG1019-QCL-&MDC010-445266
448002529 448002536 -
Operation Instruction Process controler Operation Instruction Pressure Reducing - Switching Station
FR FR
INFO INFO
2015_22-SAG-EEHC-T-000993 2015_22-SAG-EEHC-T-000993
2017-07-03 2017-07-03
&MDA010 &MTB010 &EFS010 &MDA010 &MDA010 &MDA020 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC100 &MDD030 &MDD030 &MDD030 &MFB030 &MDA010 &MDA010 &MDA010 &MDA010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010
EG1019-QCD-&MDA010-445251 EG1019-10QCD-&MTB010-445104 EG1019-40QCD-&EFS010-445208 EG1019-QCD-&MDA010-445257 EG1019-QCD-&MDA010-445261 EG1019-QCD-&MDA020-445212 EG1019-40QCB-&MDC010-445223 EG1019-QCD-&MDC010-445238 EG1019-QCD-&MDC010-445240 EG1019-QCD-&MDC010-445241 EG1019-QCD-&MDC010-445243 EG1019-QCD-&MDC010-445245 EG1019-QCD-&MDC010-445252 EG1019-QCD-&MDC010-445274 EG1019-QCD-&MDC100-445232 EG1019-QCD-&MDD030-445226 EG1019-QCD-&MDD030-445228 EG1019-QCD-&MDD030-445230 EG1019-40QCD10-&MFB030-445108 EG1019-QCD-&MDA010-445251 EG1019-QCD-&MDA010-445250 EG1019-QCD-&MDA010-445257 EG1019-QCD-&MDA010-445261 EG1019-40QCB-&MDC010-445223 EG1019-QCD-&MDC010-445237 EG1019-QCD-&MDC010-445238 EG1019-QCD-&MDC010-445240 EG1019-QCD-&MDC010-445241 EG1019-QCD-&MDC010-445243 EG1019-QCD-&MDC010-445245 EG1019-QCD-&MDC010-445252
448002383 446390581 448001966 448002444 448002482 448002017 448002215 448002246 448002260 448002284 448002307 448002321 448002390 449719891 448002161 448002109 448002123 448002147 500187713 448002383 448002376 448002444 448002482 448002215 448002239 448002246 448002260 448002284 448002307 448002321 448002390
&MDC010
EG1019-QCD-&MDC010-445274
&MBD120 &MQC010 &MTB010 &EFS010
Originator: [ADM]
B B A A A A A A B A A A A A A A A
C B -
A A A
Page 1 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MQC010 &MBD120 &MDZ070 &MDZ070 &MDZ070 &MDZ070 &MDZ070 &MDZ070 &MDZ070 &MDZ070 &MDC010 &MDC010 &MTB010 &EFS010 &MDA020 &MDC010 &MDC010
EG1019-11LCL-MQC010-462528 EG1019-11LCL-MBD120-462527 EG1019-10MA-&MDZ070-313258 EG1019-10MA-&MDZ070-313263 EG1019-20MA-&MDZ070-313319 EG1019-20MA-&MDZ070-313324 EG1019-30MA-&MDZ070-313376 EG1019-30MA-&MDZ070-313381 EG1019-40MA-&MDZ070-313433 EG1019-40MA-&MDZ070-313438 EG1019-QCL-&MDC010-445267 EG1019-QCL-&MDC010-445270 EG1019-10QCL-&MTB010-445105 EG1019-40QCL-&EFS010-445209 EG1019-QCL-&MDA020-445213 EG1019-QCL-&MDC010-445239 EG1019-QCL-&MDC010-445265
446719504 446719498 507189345 507189390 507237343 507237398 507237930 507237985 507238500 507238555 448002543 448002574 446390598 448001973 448002024 448002253 448002529
C A A A A A A A A B A -
Pump Set - EC Declaration Pump - Quality Documentation General User Information Commissioning Instructions MAA/B/C General User Information Commissioning Instructions MAA/B/C General User Information Commissioning Instructions MAA/B/C General User Information Commissioning Instructions MAA/B/C Operation Instruction Mass Flow Controller Operation Instruction Pressure gauge with contact Arrangement drawing Dosing System for Oxygen Circuit and terminal diagram Dosing Station for Oxygen Material Safety Data sheet Dosing Station for Oxygen Operation Instruction Compression fitting Operation Instruction Process controler
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-000994 2015_22-SAG-EEHC-T-000995 2015_22-SAG-EEHC-T-000996 2015_22-SAG-EEHC-T-000996 2015_22-SAG-EEHC-T-000997 2015_22-SAG-EEHC-T-000997 2015_22-SAG-EEHC-T-000998 2015_22-SAG-EEHC-T-000998 2015_22-SAG-EEHC-T-000999 2015_22-SAG-EEHC-T-000999 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000
2017-07-03 2017-07-03 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04
&MDC010 &MDC100 &MDD030 &MFB030 &EQC040 &EQC040 &MQC040 &MQC040
EG1019-QCL-&MDC010-445266 EG1019-QCL-&MDC100-445233 EG1019-QCL-&MDD030-445227 EG1019-40QCL10-&MFB030-445103 EG1019-ABK-&EQC040-712042 EG1019-ABK-&EQC040-712043 EG1019-11MK-&MQC040-360276 EG1019-11MK-&MQC040-360277
448002536 448002178 448002116 500187188 499045568 499045575 508246139 508246146
A A A -
Operation Instruction Pressure Reducing - Switching Station Commissioning Clearance Certificate Dosing Station for Oxygen Checklist M01- System Check QCL Dosing System for Oxygen Quality Inspection test for cable Test report Accessories, factory acceptance test Documentation Test Sheet Specification
FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001001 2015_22-SAG-EEHC-T-001001 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002
2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-05 2017-07-05 2017-07-07 2017-07-07
&MQC040 &MQC040
EG1019-11MK-&MQC040-360278 EG1019-11MK-&MQC040-360279
508246153 508246160 -
Stator frame End shield
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002
2017-07-07 2017-07-07
&MQC040
EG1019-11MK-&MQC040-360297
508246443 -
Bearing shells
FR
INFO
2015_22-SAG-EEHC-T-001002
2017-07-07
&MQC040
EG1019-11MK-&MQC040-360299
508246467 -
Final assembly and final tests
FR
INFO
2015_22-SAG-EEHC-T-001002
2017-07-07
&MQC040
EG1019-11MK-&MQC040-360300
508246474 -
Table of contents
FR
INFO
2015_22-SAG-EEHC-T-001002
2017-07-07
&MQC040
EG1019-11MKA-&MQC040-360280
508246177 -
Cooler
FR
INFO
2015_22-SAG-EEHC-T-001002
2017-07-07
&MQC040 &MQC040 &MQC040
EG1019-11MKA-&MQC040-360281 EG1019-11MKA-&MQC040-360282 EG1019-11MKA-&MQC040-360283
508246184 508246191 508246306 -
Stator lamination End plates Tension bolts
FR FR FR
INFO INFO INFO
2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002
2017-07-07 2017-07-07 2017-07-07
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-11MKA-&MQC040-360284 EG1019-11MKA-&MQC040-360285 EG1019-11MKA-&MQC040-360286 EG1019-11MKA-&MQC040-360287 EG1019-11MKA-&MQC040-360288 EG1019-11MKA-&MQC040-360289 EG1019-11MKA-&MQC040-360290
508246313 508246320 508246337 508246344 508246351 508246368 508246375
Stator core Stator winding bars Circuit ring Stator winding Generator Shaft Coupling Rotor winding copper
FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002
2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07
Originator: [ADM]
-
Page 2 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-11MKA-&MQC040-360291 EG1019-11MKA-&MQC040-360292 EG1019-11MKA-&MQC040-360293 EG1019-11MKA-&MQC040-360294 EG1019-11MKA-&MQC040-360295 EG1019-11MKA-&MQC040-360296 EG1019-11MKA-&MQC040-360298 EG1019-12MK-&MQC040-360326 EG1019-12MK-&MQC040-360327 EG1019-12MK-&MQC040-360328 EG1019-12MK-&MQC040-360329 EG1019-12MK-&MQC040-360347 EG1019-12MK-&MQC040-360349 EG1019-12MK-&MQC040-360350 EG1019-12MK-&MQC040-360351
508246382 508246399 508246405 508246412 508246429 508246436 508246450 508257678 508257685 508257692 508257807 508258095 508258118 508258125 508258132
-
Wedges Retaining rings incl. insert ring Blower hubs Blower blades Inductor complete H2-Shaft Sealing H.V. Bushing Documentation Test Sheet Specification Stator frame End shield Bearing shells Final assembly and final tests Table of contents Change Document
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003
2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-12MKA-&MQC040-360330 EG1019-12MKA-&MQC040-360331 EG1019-12MKA-&MQC040-360332 EG1019-12MKA-&MQC040-360333 EG1019-12MKA-&MQC040-360334 EG1019-12MKA-&MQC040-360335 EG1019-12MKA-&MQC040-360336 EG1019-12MKA-&MQC040-360337 EG1019-12MKA-&MQC040-360338 EG1019-12MKA-&MQC040-360339
508257814 508257821 508257838 508257845 508257852 508257869 508257876 508257883 508257890 508257906
-
Cooler Stator lamination End plates Tension bolts Stator core Stator winding bars Circuit ring Stator winding Generator Shaft Coupling
FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003
2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07
&MQC040
EG1019-12MKA-&MQC040-360340
508257913 -
Rotor winding copper
FR
INFO
2015_22-SAG-EEHC-T-001003
2017-07-07
&MQC040
EG1019-12MKA-&MQC040-360341
508257951 -
Wedges
FR
INFO
2015_22-SAG-EEHC-T-001003
2017-07-07
&MQC040
EG1019-12MKA-&MQC040-360342
508257982 -
Retaining rings incl. insert ring
FR
INFO
2015_22-SAG-EEHC-T-001003
2017-07-07
&MQC040
EG1019-12MKA-&MQC040-360343
508258026 -
Blower hubs
FR
INFO
2015_22-SAG-EEHC-T-001003
2017-07-07
&MQC040
EG1019-12MKA-&MQC040-360344
508258057 -
Blower blades
FR
INFO
2015_22-SAG-EEHC-T-001003
2017-07-07
&MQC040 &MQC040
EG1019-12MKA-&MQC040-360345 EG1019-12MKA-&MQC040-360346
508258071 508258088 -
Inductor complete H2-Shaft Sealing
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003
2017-07-07 2017-07-07
&MQC040 &MQC040
EG1019-12MKA-&MQC040-360348 EG1019-21MK-&MQC040-360226
508258101 508241967 -
H.V. Bushing Documentation Test Sheet
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001004
2017-07-07 2017-07-07
&MQC040
EG1019-21MK-&MQC040-360227
508241974 -
Specification
FR
INFO
2015_22-SAG-EEHC-T-001004
2017-07-07
&MQC040 &MQC040 &MQC040 &MQC040
EG1019-21MK-&MQC040-360228 EG1019-21MK-&MQC040-360229 EG1019-21MK-&MQC040-360247 EG1019-21MK-&MQC040-360249
508241981 508241998 508242674 508242698
Stator frame End shield Bearing shells Final assembly and final tests
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004
2017-07-07 2017-07-07 2017-07-07 2017-07-07
Originator: [ADM]
-
Page 3 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MQC040
EG1019-21MK-&MQC040-360250
508242704 -
Table of contents
FR
INFO
2015_22-SAG-EEHC-T-001004
2017-07-07
&MQC040
EG1019-21MKA-&MQC040-360230
508242506 -
Cooler
FR
INFO
2015_22-SAG-EEHC-T-001004
2017-07-07
&MQC040
EG1019-21MKA-&MQC040-360231
508242513 -
Stator lamination
FR
INFO
2015_22-SAG-EEHC-T-001004
2017-07-07
&MQC040
EG1019-21MKA-&MQC040-360232
508242520 -
End plates
FR
INFO
2015_22-SAG-EEHC-T-001004
2017-07-07
&MQC040
EG1019-21MKA-&MQC040-360233
508242537 -
Tension bolts
FR
INFO
2015_22-SAG-EEHC-T-001004
2017-07-07
&MQC040 &MQC040
EG1019-21MKA-&MQC040-360234 EG1019-21MKA-&MQC040-360235
508242544 508242551 -
Stator core Stator winding bars
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004
2017-07-07 2017-07-07
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-21MKA-&MQC040-360236 EG1019-21MKA-&MQC040-360237 EG1019-21MKA-&MQC040-360238 EG1019-21MKA-&MQC040-360239 EG1019-21MKA-&MQC040-360240 EG1019-21MKA-&MQC040-360241
508242568 508242575 508242582 508242599 508242605 508242612
Circuit ring Stator winding Generator Shaft Coupling Rotor winding copper Wedges
FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004
2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07
&MQC040 &MQC040 &MQC040
EG1019-21MKA-&MQC040-360242 EG1019-21MKA-&MQC040-360243 EG1019-21MKA-&MQC040-360244
508242629 508242636 508242643 -
Retaining rings incl. insert ring Blower hubs Blower blades
FR FR FR
INFO INFO INFO
2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004
2017-07-07 2017-07-07 2017-07-07
&MQC040 &MQC040 &MQC040 &EFA010 &EFE020 &EFE020 &MBD120 &MPD010 &MPD010 &MQC010 &MQC040 &MQC040 &MBD120 &MPD010 &MPD010 &MQC010 &MQC040 &MQC040 &MBD120 &MPD010 &MPD010 &MQC010 &MQC040 &MQC040 &MQC040
EG1019-21MKA-&MQC040-360245 EG1019-21MKA-&MQC040-360246 EG1019-21MKA-&MQC040-360248 EG1019-C-&EFA010-850233 EG1019-C-&EFE020-850228 EG1019-C-&EFE020-850230 EG1019-11CYQ-&MBD120-630757 EG1019-11CYQ-&MPD010-630756 EG1019-11CYQ-&MPD010-630755 EG1019-11CYQ-&MQC010-630753 EG1019-11CYQ-&MQC040-630761 EG1019-11CYQ-&MQC040-630750 EG1019-12CYQ-&MBD120-630757 EG1019-12CYQ-&MPD010-630756 EG1019-12CYQ-&MPD010-630755 EG1019-12CYQ-&MQC010-630753 EG1019-12CYQ-&MQC040-630761 EG1019-12CYQ-&MQC040-630750 EG1019-11MPB10-&MBD120-629757 EG1019-11MPB10-&MPD010-629756 EG1019-11MPB10-&MPD010-629754 EG1019-11MPB10-&MQC010-629752 EG1019-11MPB10-&MQC040-629769 EG1019-11MPB10-&MQC040-629768 EG1019-11MPB10-&MQC040-629766
508242650 508242667 508242681 503269393 498140981 503269713 507954004 507954011 507954028 507954035 507953984 507954059 507954370 507954387 507954394 507954400 507954363 507954424 507952253 507952260 507952277 507952284 507952154 507952161 507952178
Inductor complete H2-Shaft Sealing H.V. Bushing Gas Turbine Trip System Overview - Gas only Description Gas Turbine Control and Protection - Gas only Description Gas Turbine Governor - Gas only Inspection and Test Plans List of Equipment Components according ATEX List of Components EC Declaration of Conformity or Declaration of Incorporation Test Records acc. to Inspection and Test Plan Cover Sheet Inspection and Test Plans List of Equipment Components according ATEX List of Components EC Declaration of Conformity or Declaration of Incorporation Test Records acc. to Inspection and Test Plan Cover Sheet Inspection and Test Plans List of Equipment Components according ATEX List of Components EC Declaration of Conformity or Declaration of Incorporation Coating Protocols + protocols of coating reference areas Protocols of None Destructive Tests (NDT) Test Records acc. to Inspection and Test Plan
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001005 2015_22-SAG-EEHC-T-001005 2015_22-SAG-EEHC-T-001005 2015_22-SAG-EEHC-T-001006 2015_22-SAG-EEHC-T-001006 2015_22-SAG-EEHC-T-001006 2015_22-SAG-EEHC-T-001006 2015_22-SAG-EEHC-T-001006 2015_22-SAG-EEHC-T-001006 2015_22-SAG-EEHC-T-001007 2015_22-SAG-EEHC-T-001007 2015_22-SAG-EEHC-T-001007 2015_22-SAG-EEHC-T-001007 2015_22-SAG-EEHC-T-001007 2015_22-SAG-EEHC-T-001007 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008
2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10
Originator: [ADM]
-
A A A -
Page 4 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MQC040 &MQC040 &MQC040 &MQC070 &MQC070 &MQC070 &MQC070 &MBD120 &MPD010 &MPD010 &MQC010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC070 &MQC070 &MQC070
EG1019-11MPB10-&MQC040-629759 EG1019-11MPB10-&MQC040-629750 EG1019-11MPB10-&MQC040-629760 EG1019-11MPB10-&MQC070-629763 EG1019-11MPB10-&MQC070-629762 EG1019-11MPB10-&MQC070-629761 EG1019-11MPB10-&MQC070-629758 EG1019-12MPB10-&MBD120-629757 EG1019-12MPB10-&MPD010-629756 EG1019-12MPB10-&MPD010-629754 EG1019-12MPB10-&MQC010-629752 EG1019-12M1PB10-&MQC040-629769 EG1019-12MPB10-&MQC040-629768 EG1019-12MPB10-&MQC040-629766 EG1019-12MPB10-&MQC040-629759 EG1019-12MPB10-&MQC040-629750 EG1019-12MPB10-&MQC040-629760 EG1019-12MPB10-&MQC070-629763 EG1019-12MPB10-&MQC070-629762 EG1019-12MPB10-&MQC070-629761
507952222 507952291 507952307 507952185 507952192 507952208 507952239 507952840 507952857 507952864 507952871 507952765 507952772 507952789 507952826 507952888 507952895 507952796 507952802 507952819
-
Material Certificates Table of Content Cover Sheet List of Welders Welding Specifications Welding Process Qualification List of Materials with Lot Numbers Inspection and Test Plans List of Equipment Components according ATEX List of Components EC Declaration of Conformity or Declaration of Incorporation Coating Protocols + protocols of coating reference areas Protocols of None Destructive Tests (NDT) Test Records acc. to Inspection and Test Plan Material Certificates Table of Content Cover Sheet List of Welders Welding Specifications Welding Process Qualification
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009
2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10
&MQC070 &MBD120 &MPD010 &MQC010
EG1019-12MPB10-&MQC070-629758 EG1019-11SGJ-&MBD120-630256 EG1019-11SGJ-&MPD010-630255 EG1019-11SGJ-&MQC010-630257
507952833 507955575 507955599 507955551
-
List of Materials with Lot Numbers Inspection and Test Plans List of Equipment Components according PED 97/23/CE EC Declaration of Conformity or Declaration of Incorporation
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001010 2015_22-SAG-EEHC-T-001010 2015_22-SAG-EEHC-T-001010
2017-07-10 2017-07-10 2017-07-10 2017-07-10
&MQC040 &MBD120 &MPD010 &MQC010
EG1019-11SGJ-&MQC040-630250 EG1019-12SGJ-&MBD120-630256 EG1019-12SGJ-&MPD010-630255 EG1019-12SGJ-&MQC010-630257
507955612 507955889 507956008 507955865
-
Cover Sheet Inspection and Test Plans List of Equipment Components according PED 97/23/CE EC Declaration of Conformity or Declaration of Incorporation
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001010 2015_22-SAG-EEHC-T-001011 2015_22-SAG-EEHC-T-001011 2015_22-SAG-EEHC-T-001011
2017-07-10 2017-07-10 2017-07-10 2017-07-10
&MQC040 &MQC010 &MQC010 &MQC010
EG1019-12SGJ-&MQC040-630250 EG1019-11CYE-&MQC010-630765 EG1019-11CYE-&MQC010-630764 EG1019-11CYQ-&MQC010-630763
507956022 507954622 507954639 507954653
-
Cover Sheet Cabinet GF - EC Declaration of Conformity_EG1019_U11 Cabinet GH - EC Declaration of Conformity_EG1019_U11 MSA PrimaXIR_EG1019_U11 - Certificate of Calibration and Conformance
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001011 2015_22-SAG-EEHC-T-001012 2015_22-SAG-EEHC-T-001012 2015_22-SAG-EEHC-T-001012
2017-07-10 2017-07-10 2017-07-10 2017-07-10
&MQC010 &MQC010 &MQC010 &EQC010
EG1019-12CYE-&MQC010-630765 EG1019-12CYE-&MQC010-630764 EG1019-12CYQ-&MQC010-630763 EG1019-11MPB10-&EQC010-629751
507954684 507954691 507954707 507953205
-
Cabinet GF - EC Declaration of Conformity_EG1019_U12 Cabinet GH - EC Declaration of Conformity_EG1019_U12 MSA PrimaXIR_EG1019_U12 - Certificate of Calibration and Conformance Ex-proof light fitting / SCHUCH / EC Declaration of Conformity
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001013 2015_22-SAG-EEHC-T-001013 2015_22-SAG-EEHC-T-001013 2015_22-SAG-EEHC-T-001014
2017-07-10 2017-07-10 2017-07-10 2017-07-10
&EQC010 &EQC010 &EQC010 &EQC010 &MQC010 &MQC010 &MQC010 &MQC010
EG1019-11MPB10-&EQC010-629750 EG1019-11MPB10-&EQC010-629757 EG1019-11MPB10-&EQC010-629756 EG1019-11MPB10-&EQC010-629752 EG1019-11MPB10-&MQC010-629768 EG1019-11MPB10-&MQC010-629767 EG1019-11MPB10-&MQC010-629766 EG1019-11MPB10-&MQC010-629765
507953212 507953144 507953151 507953199 507952932 507952949 507952956 507952963
-
explosion protected light fitting / SCHUCH / EC Declaration of Conformity spring return motor / BELIMO / Declaration of Conformity signal processer / TURCK / Declaration of Conformity fan drive / AC-MOTOREN / EC Declaration of Conformity life line system / ABS_SAFETY / Certificate fall protection anchoring / RUD / EC Declaration of the manufacturer eye bolt / RUD / EC Declaration of Conformity STARPOINT eye bolt / RUD / EC Declaration of Conformity
FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014
2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10
Originator: [ADM]
Page 5 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &EQC010 &EQC010 &EQC010 &EQC010 &EQC010 &EQC010 &EQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010
EG1019-11MPB10-&MQC010-629763 EG1019-11MPB10-&MQC010-629762 EG1019-11MPB10-&MQC010-629761 EG1019-11MPB10-&MQC010-629760 EG1019-11MPB10-&MQC010-629764 EG1019-11MPB10-&MQC010-629759 EG1019-11MPB10-&MQC010-629758 EG1019-11MPB10-&MQC010-629754 EG1019-11MPB10-&MQC010-629753 EG1019-12MPB10-&EQC010-629755 EG1019-12MPB10-&EQC010-629751 EG1019-12MPB10-&EQC010-629750 EG1019-12MPB10-&EQC010-629757 EG1019-12MPB10-&EQC010-629756 EG1019-12MPB10-&EQC010-629752 EG1019-12MPB10-&EQC010-629755 EG1019-12MPB10-&MQC010-629768 EG1019-12MPB10-&MQC010-629767 EG1019-12MPB10-&MQC010-629766 EG1019-12MPB10-&MQC010-629765 EG1019-12MPB10-&MQC010-629763 EG1019-12MPB10-&MQC010-629762 EG1019-12MPB10-&MQC010-629761
507952987 507952994 507953106 507953113 507952970 507953120 507953137 507953175 507953182 508320631 507953410 507953427 507953359 507953366 507953403 508320662 507953243 507953250 507953267 507953274 507953298 507953304 507953311
-
push bar panic exit devices / ISEO / Certificate of Constancy of Performance door closer / GEZE / Declaration of Performance KBK-system / DEMAG / EC Conformity chain hoist / DEMAG / EC Conformity fan / VENTILATORY / Declaration of Conformity air operation damper / SYSTEMAIR / EC Declaration of Conformity multi-blade damper / ROBERT_GEIGER / Attestation of Conformity flow meter FCS / TURCK / Declaration of Conformity pressure switch for gas and air / DUNGS / Conformity Certificate resistance thermometer / WIKA / EC Declaration of Conformity Ex-proof light fitting / SCHUCH / EC Declaration of Conformity explosion protected light fitting / SCHUCH / EC Declaration of Conformity spring return motor / BELIMO / Declaration of Conformity signal processer / TURCK / Declaration of Conformity fan drive / AC-MOTOREN / EC Declaration of Conformity resistance thermometer / WIKA / EC Declaration of Conformity life line system / ABS_SAFETY / Certificate fall protection anchoring / RUD / EC Declaration of the manufacturer eye bolt / RUD / EC Declaration of Conformity STARPOINT eye bolt / RUD / EC Declaration of Conformity push bar panic exit devices / ISEO / Certificate of Constancy of Performance door closer / GEZE / Declaration of Performance KBK-system / DEMAG / EC Conformity
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015
2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10
&MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010
EG1019-12MPB10-&MQC010-629760 EG1019-12MPB10-&MQC010-629764 EG1019-12MPB10-&MQC010-629759 EG1019-12MPB10-&MQC010-629758 EG1019-12MPB10-&MQC010-629754 EG1019-12MPB10-&MQC010-629753 EG1019-11SGJ-&MQC010-630278 EG1019-11SGJ-&MQC010-630277 EG1019-11SGJ-&MQC010-630276 EG1019-11SGJ-&MQC010-630275 EG1019-11SGJ-&MQC010-630274 EG1019-11SGJ-&MQC010-630273 EG1019-11SGJ-&MQC010-630271 EG1019-11SGJ-&MQC010-630270 EG1019-11SGJ-&MQC010-630269 EG1019-11SGJ-&MQC010-630268 EG1019-11SGJ-&MQC010-630278 EG1019-12SGJ-&MQC010-630278 EG1019-12SGJ-&MQC010-630277
507953328 507953281 507953335 507953342 507953380 507953397 507956206 507956213 507956237 507956244 507956251 507956268 507956299 507956305 507956329 507956336 508328118 507956541 507956565
-
chain hoist / DEMAG / EC Conformity fan / VENTILATORY / Declaration of Conformity air operation damper / SYSTEMAIR / EC Declaration of Conformity multi-blade damper / ROBERT_GEIGER / Attestation of Conformity flow meter FCS / TURCK / Declaration of Conformity pressure switch for gas and air / DUNGS / Conformity Certificate Manifold_SO160722-Z4_EG1019_U11 Pipe EG1019_U21_22_31_32_41_42-Test Certificate Fittings GF - Test Report 2.2 SR_SO160722-Z3_EG10xx_Uall SR_SO160722-Z2_EG10xx_Uall SR_SO160722-Z1_EG10xx_Uall N2 10 ltr._EG1019_U11_Worthington Cylinder control sheet Nitrogen 10 ltr.-200 bar, BO 480._EG1019_U11 CO2 80 ltr._EG1019_U11 Cylinder control sheet Co2_EG1019_U11 Inspection Certificate 3.1_Runge_Container_EG10xx Manifold_SO160722-Z4_EG1019_U12 Pipe EG1019_U21_22_31_32_41_42-Test Certificate
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001017 2015_22-SAG-EEHC-T-001017
2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10
&MQC010
EG1019-12SGJ-&MQC010-630276
507956572 -
Fittings GF - Test Report 2.2
FR
INFO
2015_22-SAG-EEHC-T-001017
2017-07-10
&MQC010
EG1019-12SGJ-&MQC010-630275
507956596 -
SR_SO160722-Z3_EG10xx_Uall
FR
INFO
2015_22-SAG-EEHC-T-001017
2017-07-10
Originator: [ADM]
Page 6 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MQC010
EG1019-12SGJ-&MQC010-630274
507956619 -
SR_SO160722-Z2_EG10xx_Uall
FR
INFO
2015_22-SAG-EEHC-T-001017
2017-07-10
&MQC010 &MQC010 &MQC010 &MQC010 &MQC010
EG1019-12SGJ-&MQC010-630273 EG1019-12SGJ-&MQC010-630272 EG1019-12SGJ-&MQC010-630271 EG1019-12SGJ-&MQC010-630270 EG1019-12SGJ-&MQC010-630269
507956626 507956633 507956640 507956657 507956664
SR_SO160722-Z1_EG10xx_Uall Inspection Certificate 3.1_Runge_Container_EG10xx N2 10 ltr._EG1019_U12_Worthington Cylinder control sheet Nitrogen 10 ltr.-200 bar, BO 480._EG1019_U12 CO2 80 ltr._EG1019_U12
FR FR FR FR FR
INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001017 2015_22-SAG-EEHC-T-001017 2015_22-SAG-EEHC-T-001017 2015_22-SAG-EEHC-T-001017 2015_22-SAG-EEHC-T-001017
2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10
&MQC010
EG1019-12SGJ-&MQC010-630268
507956671 -
Cylinder control sheet Co2_EG1019_U12
FR
INFO
2015_22-SAG-EEHC-T-001017
2017-07-10
&MDB060
EG1019-MA-&MDB060-310573
449110032 -
Support for Cross-Over Pipe - Unit 10
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MDB060
EG1019-MA-&MDB060-310577
449110070 -
Shaft Support - Unit 10
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MDB060
EG1019-MA-&MDB060-310581
449110117 -
LP-Shaft Support - Unit 10
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MDB060
EG1019-MA-&MDB060-310585
449110155 -
Valve Supports - Unit 10
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MDB060
EG1019-MA-&MDB060-310593
449110230 -
Hydraulic Cylinders for Revision - Unit 10
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MDC010 &MDC010 &MDC010
EG1019-MA-&MDC010-310564 EG1019-MA-&MDC010-310566 EG1019-MA-&MDC010-310568
449109944 449109968 449109982 -
Lifting Device (Cross Beam) - Unit 10 Lifting Device (C-Hook) - Unit 10 Assembly Device for Valves (Stop Valve Stage 1) - Unit 10
FR FR FR
INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13
&MDC010 &MDC010 &MPA050 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010
EG1019-MA-&MDC010-310570 EG1019-MA-&MDC010-310589 EG1019-MA-&MPA050-310558 EG1019-MAA-&MPB010-310643 EG1019-MAA-&MPB010-310647 EG1019-MAA-&MPB010-310657 EG1019-MAA-&MPB010-310661 EG1019-MAB-&MPB010-310670 EG1019-MAB-&MPB010-310674 EG1019-MAC-&MPB010-313177 EG1019-MAC-&MPB010-313181 EG1019-MAC-&MPB010-313189 EG1019-MAC-&MPB010-313193 EG1019-MAD-&MPB010-310682 EG1019-MAD-&MPB010-310686 EG1019-MAD-&MPB010-313203
449110001 449110193 449109883 449110841 449110889 449110988 449111022 449111114 449111152 449111268 449111305 449111381 449111428 449111503 449111541 449111732
-
Assembly Device for Valves (Control Valve Stage 2) - Unit 10 Hydraulic Cylinders for Erection - Unit 10 List of Tools and Devices (ordered by Design Group) - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13
&MPB010 &MPB010 &MPB010 &MPB010 &MPB010
EG1019-MAD-&MPB010-313207 EG1019-MAD-&MPB010-313221 EG1019-MAD-&MPB010-313225 EG1019-MAG-&MPB010-310706 EG1019-MAG-&MPB010-310710
449111770 449111916 449111954 449112111 449112159
-
List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10
FR FR FR FR FR
INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13
Originator: [ADM]
-
Page 7 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
Support for Cross-Over Pipe - Unit 20 Shaft Support - Unit 20 LP-Shaft Support - Unit 20 Valve Supports - Unit 20 Hydraulic Cylinders for Revision - Unit 20
FR FR FR FR FR
INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13
449109951 -
Lifting Device (Cross Beam) - Unit 20
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
EG1019-MA-&MDC010-310567
449109975 -
Lifting Device (C-Hook) - Unit 20
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MDC010
EG1019-MA-&MDC010-310569
449109999 -
Assembly Device for Valves (Stop Valve Stage 1) - Unit 20
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MDC010
EG1019-MA-&MDC010-310571
449110018 -
Assembly Device for Valves (Control Valve Stage 2) - Unit 20
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MDC010
EG1019-MA-&MDC010-310590
449110209 -
Hydraulic Cylinders for Erection - Unit 20
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MPA050 &MPB010
EG1019-MA-&MPA050-310559 EG1019-MAA-&MPB010-310644
449109890 449110858 -
List of Tools and Devices (ordered by Design Group) - Unit 20 Spare Parts Lists - Unit 20
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13
&MPB010 &MPB010
EG1019-MAA-&MPB010-310648 EG1019-MAA-&MPB010-310658
449110896 449110995 -
List of Spare Parts Illustrations - Unit 20 Spare Parts Lists - Unit 20
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13
&MPB010
EG1019-MAA-&MPB010-310662
449111039 -
List of Spare Parts Illustrations - Unit 20
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MPB010 &MPB010 &MPB010 &MPB010 &MPB010
EG1019-MAB-&MPB010-310671 EG1019-MAB-&MPB010-310675 EG1019-MAC-&MPB010-313178 EG1019-MAC-&MPB010-313182 EG1019-MAC-&MPB010-313190
449111121 449111169 449111275 449111312 449111398
-
Spare Parts Lists - Unit 20 List of Spare Parts Illustrations - Unit 20 Spare Parts Lists - Unit 20 List of Spare Parts Illustrations - Unit 20 Spare Parts Lists - Unit 20
FR FR FR FR FR
INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13
&MPB010
EG1019-MAC-&MPB010-313194
449111435 -
List of Spare Parts Illustrations - Unit 20
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MPB010
EG1019-MAD-&MPB010-310683
449111510 -
Spare Parts Lists - Unit 20
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MPB010
EG1019-MAD-&MPB010-310687
449111558 -
List of Spare Parts Illustrations - Unit 20
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MPB010
EG1019-MAD-&MPB010-313204
449111749 -
Spare Parts Lists - Unit 20
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MPB010 &MPB010
EG1019-MAD-&MPB010-313208 EG1019-MAD-&MPB010-313222
449111787 449111923 -
List of Spare Parts Illustrations - Unit 20 Spare Parts Lists - Unit 20
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13
&MPB010 &MPB010 &MPB010 &MDB060 &MDB060
EG1019-MAD-&MPB010-313226 EG1019-MAG-&MPB010-310707 EG1019-MAG-&MPB010-310711 EG1019-MA-&MDB060-310575 EG1019-MA-&MDB060-310579
449111961 449112128 449112166 449110056 449110094
List of Spare Parts Illustrations - Unit 20 Spare Parts Lists - Unit 20 List of Spare Parts Illustrations - Unit 20 Support for Cross-Over Pipe - Unit 30 Shaft Support - Unit 30
FR FR FR FR FR
INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13
&MDB060 &MDB060
EG1019-MA-&MDB060-310583 EG1019-MA-&MDB060-310587
449110131 449110179 -
LP-Shaft Support - Unit 30 Valve Supports - Unit 30
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13
&MDB060 &MDB060 &MDB060 &MDB060 &MDB060
EG1019-MA-&MDB060-310574 EG1019-MA-&MDB060-310578 EG1019-MA-&MDB060-310582 EG1019-MA-&MDB060-310586 EG1019-MA-&MDB060-310594
449110049 449110087 449110124 449110162 449110247
&MDC010
EG1019-MA-&MDC010-310565
&MDC010
Originator: [ADM]
-
-
Page 8 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
&MDB060 &MDB060 &MPA050 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &BDB020 &MAB010 &MAC010 &MAC010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010
EG1019-MA-&MDB060-310591 EG1019-MA-&MDB060-310595 EG1019-MA-&MPA050-310560 EG1019-MAA-&MPB010-310645 EG1019-MAA-&MPB010-310649 EG1019-MAA-&MPB010-310659 EG1019-MAA-&MPB010-310663 EG1019-MAB-&MPB010-310672 EG1019-MAB-&MPB010-310676 EG1019-MAC-&MPB010-313179 EG1019-MAC-&MPB010-313183 EG1019-MAC-&MPB010-313191 EG1019-MAC-&MPB010-313195 EG1019-MAD-&MPB010-310684 EG1019-MAD-&MPB010-310688 EG1019-MAD-&MPB010-313205 EG1019-MAD-&MPB010-313209 EG1019-MAD-&MPB010-313223 EG1019-MAD-&MPB010-313227 EG1019-MAG-&MPB010-310708 EG1019-MAG-&MPB010-310712 EG1019-MA-&BDB020-310545 EG1019-MA-&MAB010-310542 EG1019-MA-&MAC010-310543 EG1019-MA-&MAC010-310544 EG1019-MA-&MDA010-310547 EG1019-MA-&MDA010-310548 EG1019-MA-&MDA010-310549 EG1019-MA-&MDA010-310550 EG1019-MA-&MDA010-310551 EG1019-MA-&MDA010-310552 EG1019-MAA-&MDA010-310666 EG1019-MAB-&MDA010-310679 EG1019-MAC-&MDA010-313186 EG1019-MAC-&MDA010-313187 EG1019-MAC-&MDA010-313198 EG1019-MAD-&MDA010-310697 EG1019-MAD-&MDA010-310698 EG1019-MAD-&MDA010-310699 EG1019-MAD-&MDA010-313215 EG1019-MAD-&MDA010-313216 EG1019-MAD-&MDA010-313217 EG1019-MAD-&MDA010-313233 EG1019-MAD-&MDA010-313234 EG1019-MAD-&MDA010-313235 EG1019-MAV-&MDA010-310692 EG1019-MAV-&MDA010-310693
Originator: [ADM]
UNID 449110216 449110254 449109906 449110865 449110902 449111008 449111046 449111138 449111176 449111282 449111329 449111404 449111442 449111527 449111565 449111756 449111794 449111930 449111978 449112135 449112173 449109753 449109722 449109739 449109746 449109777 449109784 449109791 449109807 449109814 449109821 449111077 449111206 449111350 449111367 449111473 449111657 449111664 449111671 449111855 449111862 449111879 449112036 449112043 449112050 449111602 449111619
Rev. -
Document Title Hydraulic Cylinders for Erection - Unit 30 Hydraulic Cylinders for Revision - Unit 30 List of Tools and Devices (ordered by Design Group) - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Identification System for Power Plants List of TP2 Equipment Preface Notes on the Use of the Manual Turbine Rating, Rating Plate Data Turbine: Types, Number of Stages and Flows, Moments of Inertia, Weights Valves: Types and Weights Steam Mass Flows, Steam Pressures, Seal Steam Supply System Oil Requirement of Bearings, Lift Oil Pump Cut-In and Out Speeds Thermal Insulation Measuring Insert Measuring Insert Double-mineral-insulated Thermocouple without a washer disc Triple-thermocouple-wire probe with a bayonet cap Duplex-Thermocouples Measuring-inserts Thermocouple with Bayonet and spring Piezoelectric Accelerometer Proximity System Triple-thermocouple-wire probe with a bayonet cap Piezoelectric Accelerometer Proximity System Triple-thermocouple-wire probe with a bayonet cap Piezoelectric Accelerometer Proximity System Check Valve Flow Control Valve
Page 9 of 33
Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
Letter No 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
Delivery Date 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MDA010 &MDA010 &MDA010 &MDA010
EG1019-MAV-&MDA010-310694 EG1019-MAV-&MDA010-310695 EG1019-MAV-&MDA010-310696 EG1019-MAV-&MDA010-313212
449111626 449111633 449111640 449111824
-
Solenoid Directional Valve Pressure Gauge Grub Screw Check Valve
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13
&MDA010 &MDA010 &MDA010 &MDA010
EG1019-MAV-&MDA010-313213 EG1019-MAV-&MDA010-313214 EG1019-MAV-&MDA010-313230 EG1019-MAV-&MDA010-313231
449111831 449111848 449112005 449112012
-
Flow Control Valve Pressure Gauge Check Valve Flow Control Valve
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13
&MDA010 &MDA020 &MDA020 &MDB060
EG1019-MAV-&MDA010-313232 EG1019-10MAG-&MDA020-313017 EG1019-10MAG-&MDA020-313016 EG1019-MA-&MDB060-310553
449112029 500175345 500214839 449109838
-
Pressure Gauge Condenser Data Sheets Condenser Vacuum Curves Main Components
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13
&MDB060 &MDB060 &MDB060 &MDB060
EG1019-MA-&MDB060-310554 EG1019-MA-&MDB060-310555 EG1019-MA-&MDB060-310556 EG1019-MA-&MDB060-310557
449109845 449109852 449109869 449109876
-
Arrangement Drawing Fixed Points HI Turbine Section / Valve Arrangement Bearings / Design
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13
&MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060
EG1019-MA-&MDB060-310562 EG1019-MA-&MDB060-310563 EG1019-MA-&MDB060-310572 EG1019-MA-&MDB060-310576 EG1019-MA-&MDB060-310580 EG1019-MA-&MDB060-310584 EG1019-MA-&MDB060-310588 EG1019-MA-&MDB060-310596 EG1019-MAA-&MDB060-310638 EG1019-MAA-&MDB060-310639 EG1019-MAA-&MDB060-310640 EG1019-MAA-&MDB060-310641 EG1019-MAA-&MDB060-310655 EG1019-MAB-&MDB060-310668 EG1019-MAC-&MDB060-313172 EG1019-MAC-&MDB060-313173 EG1019-MAC-&MDB060-313174 EG1019-MAD-&MDB060-310680 EG1019-MAD-&MDB060-310691 EG1019-MAD-&MDB060-313199 EG1019-MAD-&MDB060-313200 EG1019-MAD-&MDB060-313201 EG1019-MAD-&MDB060-313218 EG1019-MAD-&MDB060-313219 EG1019-MAG-&MDB060-310701 EG1019-MAG-&MDB060-310702 EG1019-MAG-&MDB060-310715 EG1019-MYA-&MDB060-310700
449109920 449109937 449110025 449110063 449110100 449110148 449110186 449110261 449110797 449110803 449110810 449110827 449110964 449111091 449111213 449111220 449111237 449111480 449111596 449111695 449111701 449111718 449111886 449111893 449112067 449112074 449112203 449111688
-
Standard Tools Special Tools Assembly Device for Compensator Cover Support for Cross-Over Pipe - Unit 40 Shaft Support - Unit 40 LP-Shaft Support - Unit 40 Valve Supports - Unit 40 Hydraulic Cylinders for Revision - Unit 40 Casing Casing Supports, Casing Guides Shaft Seals and Balance Pistons Blading Combined Main Steam Stop and Control Valve Combined Reheat Steam Stop and Control Valve Casing Shaft Seals Blading H Turbine Section / Front Bearing Pedestal Combined Thrust and Journal Bearing L Turbine Section / Front Bearing Pedestal Journal Bearing with bedded arc Manual Turning Gear L Turbine Section / Rear Bearing Pedestal Journal Bearing with bedded arc Box-Type Condenser Box Type Condenser / Tubing Bursting Discs Speed Sensor
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13
Originator: [ADM]
Page 10 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MDC010 &MDC010
EG1019-MA-&MDC010-310592 EG1019-MA-&MDC010-310597
449110223 449110278 -
Hydraulic Cylinders for Erection - Unit 40 Hydraulic Cylinders for Valve Inserts
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13
&MDC010 &MPA050 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MQB030 &MQC010 &MTB010 &MTB010 &MTB010 &MTB030 &MTB030 &MTB030
EG1019-MA-&MDC010-310599 EG1019-MA-&MPA050-310561 EG1019-MAA-&MPB010-310646 EG1019-MAA-&MPB010-310650 EG1019-MAA-&MPB010-310652 EG1019-MAA-&MPB010-310654 EG1019-MAA-&MPB010-310660 EG1019-MAA-&MPB010-310664 EG1019-MAB-&MPB010-310653 EG1019-MAB-&MPB010-310673 EG1019-MAB-&MPB010-310677 EG1019-MAC-&MPB010-313180 EG1019-MAC-&MPB010-313184 EG1019-MAC-&MPB010-313192 EG1019-MAC-&MPB010-313196 EG1019-MAD-&MPB010-310685 EG1019-MAD-&MPB010-310689 EG1019-MAD-&MPB010-313206 EG1019-MAD-&MPB010-313210 EG1019-MAD-&MPB010-313224 EG1019-MAD-&MPB010-313228 EG1019-MAG-&MPB010-310709 EG1019-MAG-&MPB010-310713 EG1019-MA-&MQB030-310546 EG1019-MA-&MQC010-310598 EG1019-MA-&MTB010-310720 EG1019-MAC-&MTB010-313175 EG1019-10MAG-&MTB010-313009 EG1019-MAA-&MTB030-310642 EG1019-MAA-&MTB030-310651 EG1019-MAA-&MTB030-310656
449110292 449109913 449110872 449110919 449110933 449110957 449111015 449111053 449110940 449111145 449111183 449111299 449111336 449111411 449111459 449111534 449111572 449111763 449111800 449111947 449111985 449112142 449112180 449109760 449110285 449112210 449111244 501224615 449110834 449110926 449110971
Bolt Heating Device List of Tools and Devices (ordered by Design Group) - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Double-mineral-insulated thermocouple with a washer disc Measuring Insert Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Double-mineral-insulated Thermocouple without a washer disc Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 General Safety Information Separate Delivered Lifting Accessories Balancing at the Plant Balancing at the Plant Tube Pattern Design Group Overviews Spare Parts Illustrations Design Group Overviews
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13
&MTB030
EG1019-MAA-&MTB030-310665
449111060 -
Spare Parts Illustrations
FR
INFO
2015_22-SAG-EEHC-T-001018
2017-07-13
&MTB030 &MTB030 &MTB030 &MTB030
EG1019-MAB-&MTB030-310669 EG1019-MAB-&MTB030-310678 EG1019-MAC-&MTB030-313176 EG1019-MAC-&MTB030-313185
449111107 449111190 449111251 449111343
-
Design Group Overviews Spare Parts Illustrations Design Group Overviews Spare Parts Illustrations
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13
&MTB030 &MTB030 &MTB030 &MTB030 &MTB030 &MTB030 &MTB030
EG1019-MAC-&MTB030-313188 EG1019-MAC-&MTB030-313197 EG1019-MAD-&MTB030-310681 EG1019-MAD-&MTB030-310690 EG1019-MAD-&MTB030-313202 EG1019-MAD-&MTB030-313211 EG1019-MAD-&MTB030-313220
449111374 449111466 449111497 449111589 449111725 449111817 449111909
-
Design Group Overviews Spare Parts Illustrations Design Group Overviews Spare Parts Illustrations Design Group Overviews Spare Parts Illustrations Design Group Overviews
FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018
2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13
Originator: [ADM]
-
Page 11 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MTB030 &MTB030 &MTB030 &MTC020 &MTC020 &MTC020 &MTC020 &MTC020 &MTC020 &MTC020 &MTC020 &ABB010 &EDA010 &EDA010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDA010 &EDC010 &EDC010 &ETB010 &MDC020
EG1019-MAD-&MTB030-313229 EG1019-MAG-&MTB030-310705 EG1019-MAG-&MTB030-310714 EG1019-MA-&MTC020-310372 EG1019-MA-&MTC020-310398 EG1019-MA-&MTC020-310485 EG1019-MA-&MTC020-310486 EG1019-MA-&MTC020-310487 EG1019-MA-&MTC020-310488 EG1019-MAG-&MTC020-310703 EG1019-MAG-&MTC020-310281 EG1019-11650-&ABB010-000202 EG1019-C-&EDA010-870159 EG1019-C-&EDA010-870160 EG1019-C-&EDC010-870154 EG1019-C-&EDC010-870155 EG1019-C-&EDC010-870156 EG1019-C-&EDC010-870157 EG1019-MAG-&EDC010-870163 EG1019-MAG-&EDC010-870164 EG1019-C-&EDA010-870158 EG1019-C-&EDC010-870153 EG1019-MAN-&EDC010-870162 EG1019-C-&ETB010-870161 EG1019-PUR10-&MDC020-435152
449111992 449112104 449112197 505817912 505818179 505819046 505819053 505819060 505819077 449112081 504249738 508396117 507837772 507837789 507837727 507837734 507837741 507837758 507837819 507837826 507837765 507837710 507837802 507837796 438895438
A A D A D B F -
Spare Parts Illustrations Design Group Overviews Spare Parts Illustrations LONGITUDINAL SECTION ARRANGEMENT OF ENDOSCOPE HOLES VALVE COMPLETE DRY AIR CONNECTION ASSY VALVE COMPLETE DRY AIR CONNECTION ASSY Tube Spacing GENERAL ARRANGEMENT DWG FOR CONDENSER Monthly Progress Report No. 22 WIKA_Surface Themometer TC50_Data Sheet WIKA_Pressure Gauge 233.50_Data Sheet E+H_Pressure Transmitter PMP71_Technical Information E+H_Pressure Transmitter PMP71_Operating Instructions E+H_Pressure Transmitter PMP71_Description of Instrument Functions E+H_Weld-In Adapter and Flanges_Technical Information Heinrichs_Magnetic Level Meter, MBSK, Installation and Operating Instructions Heinrichs_Magnetic Level Meter, MBSK-Ex, Operating manual WIKA_Thermocouple TC10-B_Data Sheet SITRANS P DSIII for Pressure and Differentialpressure 7MF4.33-_Manual Seiko_ISA 1932 Nozzle 6"_O&M Manual Schneider_Manifolds, valves, reducers_Drawings Cathodic Protection O&M
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001019 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001021
2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-14 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18
&MLH020 &EAA010 &EFA010 &EFF010 &MDA010 &MDA010 &MFB030 &MLH020 &MLU010 &MLU010 &MPA070 &MPB010 &MPB010 &MPB010 &EDA010 &EDA010 &EDA010 &EDA010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010
EG1019-10PAC-&MLH020-461010 EG1019-PUR10-&EAA010-435130 EG1019-PUR10-&EFA010-435131 EG1019-PAC-&EFF010-461014 EG1019-PAC-&MDA010-461061 EG1019-PAC-&MDA010-461031 EG1019-40PAC10-&MFB030-461005 EG1019-PAC-&MLH020-461010 EG1019-PUR10-&MLU010-435122 EG1019-PUR10-&MLU010-435123 EG1019-PAC-&MPA070-461017 EG1019-PAC-&MPB010-461011 EG1019-PAC-&MPB010-461012 EG1019-PAC-&MPB010-461019 EG1019-PAC-&EDA010-461201 EG1019-PAC-&EDA010-461404 EG1019-PAC-&EDA010-461405 EG1019-PAC-&EDA010-461409 EG1019-PAC-&EDC010-461200 EG1019-PAC-&EDC010-461406 EG1019-PAC-&EDC010-461407 EG1019-PAC-&EDC010-461408 EG1019-PAC-&EDC010-461410
445107777 447625545 447625446 438894356 448557821 499689540 499690355 438894318 447625385 447625392 438894370 438894325 438894332 438894394 438894721 438895636 438895643 438895681 438894714 438895650 438895667 438895674 438895698
A B A A A C F A A A C B B C A A A C A B B A
Preliminary GA Drawing M2 Cathodic Protection Electrical eng documents Cathodic Protection Single line diagram Logic Diagram Assembly data (torques) Pump - Characteristic Curves (Designed) PuID Piping and Instrumentation Diagram General Arrangement Drawing Cathodic Protection plan view_GA Cathodic Protection side view_GA List of Consumers Lubrications List of Instruments List of Valves List of Recommended Spare Parts Motor - Documentation Temp. Sensor CT001-CT003 Datasheet Temp. Sensor CT071-CT075 Datasheet Temp. Transmitter CT001-CT003 Datasheet Motor - Operating Manual Temp. Sensor CT077-CT079 Datasheet Vib. Sensor CY061-CY062 Datasheet Vib. Sensor CY061-CY062 Manual Temp. Transmitter CT001-CT079 Manual
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022
2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18
Originator: [ADM]
Page 12 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&EDC010 &EDC010 &EMA020 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDC010 &MDC010 &MDC010 &MDZ050 &MLH020 &MLU010 &MPA050 &MPB010 &MTB010 &MTB010 &MTB010 &MTB010 &MTB010 &MTB010
EG1019-PAC-&EDC010-461411 EG1019-10PAC-&EDC010-461412 EG1019-PAC-&EMA020-461016 EG1019-PAC-&MDA010-461030 EG1019-PAC-&MDA010-461031 EG1019-PAC-&MDA010-461032 EG1019-PAC-&MDA010-461400 EG1019-PAC-&MDA010-461401 EG1019-PAC-&MDA010-461402 EG1019-PAC-&MDC010-461403 EG1019-PAC-&MDC010-461070 EG1019-PAC-&MDC010-461101 EG1019-PAC-&MDC010-461026 EG1019-PAC-&MDZ050-461214 EG1019-PAC-&MLH020-461015 EG1019-PAC-&MLU010-461024 EG1019-PAC-&MPA050-461065 EG1019-PAC-&MPB010-461021 EG1019-PAC-&MTB010-461020 EG1019-PAC-&MTB010-461022 EG1019-PAC-&MTB010-461023 EG1019-PAC-&MTB010-461102 EG1019-PAC-&MTB010-461025 EG1019-PUR10-&MTB010-435114
438895704 438895711 438894363 438894455 438894462 438894479 438895599 438895605 438895612 438895629 438894585 438894684 508080610 438895728 447625828 438894448 438894578 438894417 438894400 438894424 438894431 438894691 508079591 447625330
A A B A C A A A A A A A A A B A A B A A A A
Temp. Transmitter CT071-CT079 Datasheet Manual Transmitter CT071-CT079 Wiring Diagram Pump - Data Sheet Pump - Characteristic Curve Pump - Start Up Curve Thermometer CT501 Datasheet Pressure Gauge CP501 Datasheet Shut Off Valve AA301 Datasheet Sight Glass AX001 Datasheet Pump - Operating Manual Coupling Operating Manual Pump - Axial Bearing Handbook Motor Ladder Extension - Installation Details Cathodic Protection System on Pump Pump - Pipework Plan List of Special Tools Pump - Parts List Pump - Sectional Drawing Pump - Axial Bearing Details Pump - Shaft Seal Details Coupling Dimensional Drawing Pump - Radial Bearing Details Cathodic Protection Disc anode 100 dim dwg
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022
2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18
&MTB010 &MTB010 &MTB010 &MTB010
EG1019-PUR10-&MTB010-435115 EG1019-PUR10-&MTB010-435117 EG1019-PUR10-&MTB010-435118 EG1019-PUR10-&MTB010-435120
447625347 447625354 447625361 447625378
A A A A
Cathodic Protection Ribbon anode dim dwg Cathodic Protection Reference electrode dim dwg Cathodic Protection Current Collector Cathodic Protection Junction Box Support
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022
2017-07-18 2017-07-18 2017-07-18 2017-07-18
&MTB010 &MTB010 &ELU010 &ELU010
EG1019-PUR10-&MTB010-435124 EG1019-PUR10-&MTB010-435125 EG1019-30CJJ11-&EDC010-870177 EG1019-30CJJ22-&EDC010-870178
447625408 447625415 508054659 508054666
A A A A
Cathodic Protection Disc anode 60 dim dwg Cathodic Protection Reference electrode wall dim dwg 30CJJ11_ARRANGEMENT_DRAWINGS 30CJJ22_ARRANGEMENT_DRAWINGS
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001024 2015_22-SAG-EEHC-T-001024
2017-07-18 2017-07-18 2017-07-20 2017-07-20
&ELU010 &ELU010 &EMA010 &EMA010
EG1019-30CJJ23-&EDC010-870179 EG1019-30CJJ24-&EDC010-870180 EG1019-30C-&EMA010-870182 EG1019-30C-&EMA010-870183
508054673 508054680 508054703 508054710
A A A A
30CJJ23_ARRANGEMENT_DRAWINGS 30CJJ24_ARRANGEMENT_DRAWINGS ST30_Interconnection Diagrams_Part 1 ST30_Interconnection Diagrams_Part 2
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001024 2015_22-SAG-EEHC-T-001024 2015_22-SAG-EEHC-T-001024 2015_22-SAG-EEHC-T-001024
2017-07-20 2017-07-20 2017-07-20 2017-07-20
&EMA010 &ELU010 &ELU010 &ELU010
EG1019-30CRN-&EMA010-870181 EG1019-40CJJ11-&EDC010-870186 EG1019-40CJJ22-&EDC010-870187 EG1019-40CJJ23-&EDC010-870188
508054697 508070253 508070260 508070277
A A A A
L2 BUS ST30 40CJJ11_ARRANGEMENT_DRAWINGS 40CJJ22_ARRANGEMENT_DRAWINGS 40CJJ23_ARRANGEMENT_DRAWINGS
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001024 2015_22-SAG-EEHC-T-001025 2015_22-SAG-EEHC-T-001025 2015_22-SAG-EEHC-T-001025
2017-07-20 2017-07-20 2017-07-20 2017-07-20
&ELU010 &EMA010 &EMA010 &EMA010
EG1019-40CJJ24-&EDC010-870189 EG1019-40C-&EMA010-870191 EG1019-40C-&EMA010-870192 EG1019-40CRN-&EMA010-870190
508070284 508070307 508070314 508070291
A A A A
40CJJ24_ARRANGEMENT_DRAWINGS ST40_Interconnection Diagrams_Part 1 ST40_Interconnection Diagrams_Part 2 L2 BUS ST40
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001025 2015_22-SAG-EEHC-T-001025 2015_22-SAG-EEHC-T-001025 2015_22-SAG-EEHC-T-001025
2017-07-20 2017-07-20 2017-07-20 2017-07-20
Originator: [ADM]
Page 13 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
&EFS010 &EMA010 &ETB010 &EDD010 &ETB010 &ELU010 &EMA020 &EMA020 &EDD010 &ETB010 &ELU010 &EMA020 &EMA020 &EDD010 &ETB010 &ELU010 &EMA020 &EMA020 &EDD010 &ETB010 &ELU010 &EMA020 &EMA020 &EFS010 &EFS010 &EMA010 &EFS010 &EFS010 &EFS010 &EFS010 &EMA010 &EMA010 &EFS010 &EFS010 &EMA010 &EFS010 &EFS010 &EFS010 &EFS010 &EMA010 &EMA010 &CLH020 &CLH020 &EFS010 &CLB020 &EFS010 &EDB060 &EDC010
EG1019-41BAB40-&EFS010-734543 EG1019-41BAB40-&EMA010-734540 EG1019-BAB40-&ETB010-734541 EG1019-BTA-&EED010-731540 EG1019-BTA-&ETB010-731509 EG1019-BTA-&ELU010-731501 EG1019-31BTA-&EMA020-731502 EG1019-31BTA-&EMA020-731503 EG1019-BTA-&EED010-731540 EG1019-BTA-&ETB010-731509 EG1019-BTA-&ELU010-731501 EG1019-32BTA-&EMA020-731502 EG1019-32BTA-&EMA020-731503 EG1019-BTA-&EED010-731540 EG1019-BTA-&ETB010-731509 EG1019-BTA-&ELU010-731501 EG1019-41BTA-&EMA020-731502 EG1019-41BTA-&EMA020-731503 EG1019-BTA-&EED010-731540 EG1019-BTA-&ETB010-731509 EG1019-BTA-&ELU010-731501 EG1019-42BTA-&EMA020-731502 EG1019-42BTA-&EMA020-731503 EG1019-31MKC-&EFS010-745528 EG1019-31MKC-&EFS010-745532 EG1019-31MKC01-&EMA010-745511 EG1019-32MBJ-&EFS010-745530 EG1019-32MBJ-&EFS010-745531 EG1019-32MKC-&EFS010-745528 EG1019-32MKC-&EFS010-745532 EG1019-32MBJ01-&EMA010-745507 EG1019-32MKC01-&EMA010-745511 EG1019-41MKC-&EFS010-745528 EG1019-41MKC-&EFS010-745532 EG1019-41MKC01-&EMA010-745511 EG1019-42MBJ-&EFS010-745530 EG1019-42MBJ-&EFS010-745531 EG1019-42MKC-&EFS010-745528 EG1019-42MKC-&EFS010-745532 EG1019-42MBJ01-&EMA010-745507 EG1019-42MKC01-&EMA010-745511 EG1019-42UBA-&CLH020-779132 EG1019-31UBA-&CLH020-779101 EG1019-31UBA-&EFS010-779100 EG1019-41UBA-&CLB020-779123 EG1019-UBA-&EFS010-779549 EG1019-UBA-&EDB060-779551 EG1019-UBA-&EDC010-779552
Originator: [ADM]
UNID 447533079 447533062 498063655 502206610 498061941 498061927 446600420 446600437 502206610 498061941 498061927 446600444 446600451 502206610 498061941 498061927 446600468 446600475 502206610 498061941 498061927 446600482 446600499 499164917 500792634 500621781 499164863 500791460 499164924 500792641 500621767 500621774 499164931 500792658 447532997 499164870 500791477 499164948 500792665 447533000 500621750 439831701 439831572 439831565 439831671 503605634 503605610 503605603
Rev. A A A A A A A A A A A A A A A A A A A A A A B B -
Document Title Circuit Diagram SFC C/O Isolator Cubicle 41BAB40 Connection Diagram SFC C/O Isolator Cubicle 41BAB40 Layout Drawing SFC C/O Isolator Cubicle BAB40 Calculation of ventilation Fitting Drawing Battery Rack Layout Drawing Battery on Steel Rack Connection Overview Drawing Battery on Steel Rack 31BTA Connection Details Drawing Battery 31BTA Calculation of ventilation Fitting Drawing Battery Rack Layout Drawing Battery on Steel Rack Connection Overview Drawing Battery on Steel Rack 32BTA Connection Details Drawing Battery 32BTA Calculation of ventilation Fitting Drawing Battery Rack Layout Drawing Battery on Steel Rack Connection Overview Drawing Battery on Steel Rack 41BTA Connection Details Drawing Battery 41BTA Calculation of ventilation Fitting Drawing Battery Rack Layout Drawing Battery on Steel Rack Connection Overview Drawing Battery on Steel Rack 42BTA Connection Details Drawing Battery 42BTA Circuit Diagram SEE Transformer 31MKC PT100 Setting Parameters SEE Transformer 31MKC Connection Diagram SEE Transformer 31MKC01 Circuit Diagram SFC Transformer 32MBJ PT100 Setting Parameters SFC Transformer 32MBJ Circuit Diagram SEE Transformer 32MKC PT100 Setting Parameters SEE Transformer 32MKC Connection Diagram SFC Transformer 32MBJ01 Connection Diagram SEE Transformer 32MKC01 Circuit Diagram SEE Transformer 41MKC PT100 Setting Parameters SEE Transformer 41MKC Connection Diagram SEE Transformer 41MKC01 Circuit Diagram SFC Transformer 42MBJ PT100 Setting Parameters SFC Transformer 42MBJ Circuit Diagram SEE Transformer 42MKC PT100 Setting Parameters SEE Transformer 42MKC Connection Diagram SFC Transformer 42MBJ01 Connection Diagram SEE Transformer 42MKC01 SECTION A-A for GAS TURBINE Drawing Arrangement for Circuit Diagram PCC Station Service 31BJL31 FOUNDATION DRAWING for GAS TURBINE Circuit Diagram Air Conditioning Unit Battery Room Technical Description PCC Operating Instructions PCC
Page 14 of 33
Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
Letter No 2015_22-SAG-EEHC-T-001026 2015_22-SAG-EEHC-T-001026 2015_22-SAG-EEHC-T-001026 2015_22-SAG-EEHC-T-001027 2015_22-SAG-EEHC-T-001027 2015_22-SAG-EEHC-T-001027 2015_22-SAG-EEHC-T-001027 2015_22-SAG-EEHC-T-001027 2015_22-SAG-EEHC-T-001028 2015_22-SAG-EEHC-T-001028 2015_22-SAG-EEHC-T-001028 2015_22-SAG-EEHC-T-001028 2015_22-SAG-EEHC-T-001028 2015_22-SAG-EEHC-T-001029 2015_22-SAG-EEHC-T-001029 2015_22-SAG-EEHC-T-001029 2015_22-SAG-EEHC-T-001029 2015_22-SAG-EEHC-T-001029 2015_22-SAG-EEHC-T-001030 2015_22-SAG-EEHC-T-001030 2015_22-SAG-EEHC-T-001030 2015_22-SAG-EEHC-T-001030 2015_22-SAG-EEHC-T-001030 2015_22-SAG-EEHC-T-001031 2015_22-SAG-EEHC-T-001031 2015_22-SAG-EEHC-T-001031 2015_22-SAG-EEHC-T-001032 2015_22-SAG-EEHC-T-001032 2015_22-SAG-EEHC-T-001032 2015_22-SAG-EEHC-T-001032 2015_22-SAG-EEHC-T-001032 2015_22-SAG-EEHC-T-001032 2015_22-SAG-EEHC-T-001033 2015_22-SAG-EEHC-T-001033 2015_22-SAG-EEHC-T-001033 2015_22-SAG-EEHC-T-001034 2015_22-SAG-EEHC-T-001034 2015_22-SAG-EEHC-T-001034 2015_22-SAG-EEHC-T-001034 2015_22-SAG-EEHC-T-001034 2015_22-SAG-EEHC-T-001034 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001035
Delivery Date 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
&EFS010 &CLH020 &CLB020 &CLH020 &EFS010 &EFS010 &EDB060 &EDC010 &EFS010 &CLH020 &CLB020 &CLH020 &EFS010 &EFS010 &EDB060 &EDC010 &EFS010 &CLH020 &EFS010 &CLB020 &CLH020 &EDB060 &EDC010 &EFS010 &EFS010 &MDA010 &MDA010 &MTB010 &EPA030 &MDA010 &MDA010 &MPB010 &MTB010 &MAB010 &MAB010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-UBA-&EFS010-779557 EG1019-42UBA-&CLH020-779132 EG1019-32UBA-&CLB020-779113 EG1019-32UBA-&CLH020-779111 EG1019-32UBA-&EFS010-779110 EG1019-UBA-&EFS010-779549 EG1019-UBA-&EDB060-779551 EG1019-UBA-&EDC010-779552 EG1019-UBA-&EFS010-779557 EG1019-42UBA-&CLH020-779132 EG1019-41UBA-&CLB020-779123 EG1019-41UBA-&CLH020-779121 EG1019-41UBA-&EFS010-779120 EG1019-UBA-&EFS010-779549 EG1019-UBA-&EDB060-779551 EG1019-UBA-&EDC010-779552 EG1019-UBA-&EFS010-779557 EG1019-42UBA-&CLH020-779132 EG1019-UBA-&EFS010-779549 EG1019-42UBA-&CLB020-779133 EG1019-42UBA-&CLH020-779131 EG1019-UBA-&EDB060-779551 EG1019-UBA-&EDC010-779552 EG1019-42UBA-&EFS010-779130 EG1019-UBA-&EFS010-779557 EG1019-00STG-&MDA010-496365 EG1019-00STG-&MDA010-496366 EG1019-00STG-&MTB010-496372 EG1019-00STG-&EPA030-496312 EG1019-00STG-&MDA010-496365 EG1019-00STG-&MDA010-496366 EG1019-00STG-&MPB010-496304 EG1019-00STG-&MTB010-496372 EG1019-40MA-&MAB010-311017 EG1019-40MA-&MAB010-311020 EG1019-40MA-&MQC040-311018 EG1019-40MA-&MQC040-311019 EG1019-40MA-&MQC040-311021 EG1019-40MA-&MQC040-311022 EG1019-40MA-&MQC040-311023 EG1019-40MA-&MQC040-311024 EG1019-40MA-&MQC040-311025 EG1019-40MA-&MQC040-311026 EG1019-40MA-&MQC040-311027 EG1019-40MA-&MQC040-311028 EG1019-40MA-&MQC040-311029 EG1019-40MA-&MQC040-311030
Originator: [ADM]
UNID 503605627 439831701 439831633 439831619 439831602 503605634 503605610 503605603 503605627 439831701 439831671 439831657 439831640 503605634 503605610 503605603 503605627 439831701 503605634 439831718 439831695 503605610 503605603 439831688 503605627 448307334 448307341 448307181 448307266 448307334 448307341 448307655 448307181 508155615 508155646 508155622 508155639 508155653 508155660 508155677 508155684 508155691 508155707 508155714 508155721 508155738 508155745
Rev. B B C B F B -
Document Title Circuit Diagram Air Conditioning Units PCCs SECTION A-A for GAS TURBINE FOUNDATION DRAWING for GAS TURBINE Drawing Arrangement for Circuit Diagram PCC Station Service 32BJL31 Circuit Diagram Air Conditioning Unit Battery Room Technical Description PCC Operating Instructions PCC Circuit Diagram Air Conditioning Units PCCs SECTION A-A for GAS TURBINE FOUNDATION DRAWING for GAS TURBINE Drawing Arrangement for Circuit Diagram PCC Station Service 41BJL31 Circuit Diagram Air Conditioning Unit Battery Room Technical Description PCC Operating Instructions PCC Circuit Diagram Air Conditioning Units PCCs SECTION A-A for GAS TURBINE Circuit Diagram Air Conditioning Unit Battery Room FOUNDATION DRAWING for GAS TURBINE Drawing Arrangement for Technical Description PCC Operating Instructions PCC Circuit Diagram PCC Station Service 42BJL31 Circuit Diagram Air Conditioning Units PCCs Safety Data Sheets Laboratory Chemicals Safety Data Sheets Reagents for water analysis Arrangement Drawings Circuit Electrical Consumer List Safety Data Sheets Laboratory Chemicals Safety Data Sheets Reagents for water analysis Dispatch List Arrangement Drawings Circuit Table of Contents HI Turbine - Table of Contents Documentation Test Sheet QST- Specification Outer casing Outer casing Inner casing Inner casing Turbine shaft Turbine rotor Stationary blades T-F-3DS Stationary blades T-F-3DS Stationary blades T-F-3DS Stationary blades T-F-3DS
Page 15 of 33
Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
Letter No 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001039 2015_22-SAG-EEHC-T-001039 2015_22-SAG-EEHC-T-001039 2015_22-SAG-EEHC-T-001040 2015_22-SAG-EEHC-T-001040 2015_22-SAG-EEHC-T-001040 2015_22-SAG-EEHC-T-001040 2015_22-SAG-EEHC-T-001040 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041
Delivery Date 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MQC040 &MQC040 &MQC040 &MQC040
EG1019-40MA-&MQC040-311031 EG1019-40MA-&MQC040-311032 EG1019-40MA-&MQC040-311033 EG1019-40MA-&MQC040-311034
508155752 508155769 508155776 508155783
-
Stationary blades T-F-3DS Stationary blades T-F-3DS Rotor blades T-F-3DS Rotor blades T-F-3DS
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041
2017-07-21 2017-07-21 2017-07-21 2017-07-21
&MQC040 &MQC040 &MQC040 &MQC040
EG1019-40MA-&MQC040-311035 EG1019-40MA-&MQC040-311036 EG1019-40MA-&MQC040-311037 EG1019-40MA-&MQC040-311038
508155790 508155806 508155813 508155820
-
Rotor blades T-F-3DS Rotor blades T-F-3DS Rotor blades T-F-3DS Valve casing
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041
2017-07-21 2017-07-21 2017-07-21 2017-07-21
&MQC040 &MQC040 &MQC040 &EFS010
EG1019-40MA-&MQC040-311039 EG1019-40MA-&MQC040-311040 EG1019-40MA-&MQC040-311041 EG1019-32BBJ-&EFS010-734562
508155837 508155844 508155851 447534052
A
Valve cover Valve cover Turbine assembly SFC Circuit Breaker Circuit Diagram 32BBJ
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001043
2017-07-21 2017-07-21 2017-07-21 2017-07-21
&EMA010 &EFS010 &EMA010 &MAB010
EG1019-32BBJ-&EMA010-734517 EG1019-42BBJ-&EFS010-734562 EG1019-42BBJ-&EMA010-734517 EG1019-MBP-&MAB010-352300
500619092 447534069 447532928 502750687
A A A A
Connection Diagram SFC CB SWITCHGEAR 32BBJ SFC Circuit Breaker Circuit Diagram 42BBJ Connection Diagram SFC CB SWITCHGEAR 42BBJ Table of Contents - Control Valve, Fuel Gas, Pilot
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001043 2015_22-SAG-EEHC-T-001044 2015_22-SAG-EEHC-T-001044 2015_22-SAG-EEHC-T-001045
2017-07-21 2017-07-21 2017-07-21 2017-07-24
&MAB010 &MAB010 &MAB010 &MAB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MQB030 &MQB030 &MQB030 &MQB030 &MQB030 &MTB030 &MTB030 &MTB030 &MTB030 &MTB030 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060
EG1019-MBP-&MAB010-352307 EG1019-MBP-&MAB010-352314 EG1019-MBP-&MAB010-352320 EG1019-MBP-&MAB010-352327 EG1019-MBP-&MPB010-352302 EG1019-MBP-&MPB010-352309 EG1019-MBP-&MPB010-352316 EG1019-MBP-&MPB010-352322 EG1019-MBP-&MPB010-352329 EG1019-MBP-&MQB030-352301 EG1019-MBP-&MQB030-352308 EG1019-MBP-&MQB030-352315 EG1019-MBP-&MQB030-352321 EG1019-MBP-&MQB030-352328 EG1019-MBP-&MTB030-352303 EG1019-MBP-&MTB030-352310 EG1019-MBP-&MTB030-352317 EG1019-MBP-&MTB030-352323 EG1019-MBP-&MTB030-352330 EG1019-MBP-&MDB060-352305 EG1019-MBP-&MDB060-352306 EG1019-MBP-&MDB060-352312 EG1019-MBP-&MDB060-352313 EG1019-MBP-&MDB060-352319 EG1019-MBP-&MDB060-352320 EG1019-MBP-&MDB060-352325 EG1019-MBP-&MDB060-352326 EG1019-MBP-&MDB060-352332
503528759 503528957 503529022 503537669 502750731 503528773 503528971 503529046 503537683 498154025 503528766 503528964 503529039 503537676 498154049 503528780 503528988 503529053 503537690 502750786 503527196 503528902 503528919 503529008 503529015 503529084 503529091 503538116
A A A A A A A A A A A A A A A A A A A A A A A A A A A A
Table of Contents - Control Valve, Fuel Gas, Stage A Table of Contents - Control Valve, Fuel Gas, Stage B Table of Contents - Control Valve, Fuel Gas, Stage C Table of Contents - Control Valve, Fuel Gas, Stage D Spare Parts List Spare Parts List Spare Parts List Spare Parts List Spare Parts List Safety Notes Safety Notes Safety Notes Safety Notes Safety Notes Spare Parts Drawing Spare Parts Drawing Spare Parts Drawing Spare Parts Drawing Spare Parts Drawing Control Valve Actuator with trip function Natural Gas Control Valve Actuator Natural Gas Control Valve Actuator Natural Gas Control Valve Actuator Control Valve Natural Gas
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046
2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24
Originator: [ADM]
Page 16 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MDB060 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010
EG1019-MBP-&MDB060-352333 EG1019-MBP-&MPB010-352304 EG1019-MBP-&MPB010-352311 EG1019-MBP-&MPB010-352318 EG1019-MBP-&MPB010-352324 EG1019-MBP-&MPB010-352331
503538123 498154056 503528797 503528995 503529077 503538109
A A A A A A
Actuator KKS Reference List KKS Reference List KKS Reference List KKS Reference List KKS Reference List
FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046
2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-21MBP-&MQC040-352434 EG1019-21MBP-&MQC040-352435 EG1019-21MBP-&MQC040-352436 EG1019-21MBP-&MQC040-352437 EG1019-21MBP-&MQC040-352438 EG1019-21MBP-&MQC040-352439 EG1019-21MBP-&MQC040-352440 EG1019-21MBP-&MQC040-352441 EG1019-21MBP-&MQC040-352442 EG1019-21MBP-&MQC040-352443 EG1019-21MBP-&MQC040-352444 EG1019-21MBP-&MQC040-352445 EG1019-21MBP-&MQC040-352446 EG1019-21MBP-&MQC040-352447 EG1019-21MBP-&MQC040-352448 EG1019-21MBP-&MQC040-352449 EG1019-21MBP-&MQC040-352450 EG1019-21MBP-&MQC040-352451 EG1019-21MBP-&MQC040-352452
508323380 508323397 508326008 508326015 508326022 508326039 508326046 508326053 508326060 508326077 508326084 508326091 508326107 508326114 508326121 508326138 508326145 508326152 508326169
-
Quality Test Sheet - Control Valve, Fuel Gas, Pilot Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage A Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage B Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage C Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage D Declaration of Conformity Test Record
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047
2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24
&MQC040 &MQC040
EG1019-21MBP-&MQC040-352453 EG1019-22MBP-&MQC040-352414
508326176 508320303 -
Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Pilot
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001048
2017-07-24 2017-07-24
&MQC040 &MQC040
EG1019-22MBP-&MQC040-352415 EG1019-22MBP-&MQC040-352416
508320310 508320327 -
Declaration of Conformity Test Record
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048
2017-07-24 2017-07-24
&MQC040
EG1019-22MBP-&MQC040-352417
508320334 -
Characteristic Curve
FR
INFO
2015_22-SAG-EEHC-T-001048
2017-07-24
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-22MBP-&MQC040-352418 EG1019-22MBP-&MQC040-352419 EG1019-22MBP-&MQC040-352420 EG1019-22MBP-&MQC040-352421 EG1019-22MBP-&MQC040-352422 EG1019-22MBP-&MQC040-352423 EG1019-22MBP-&MQC040-352424 EG1019-22MBP-&MQC040-352425 EG1019-22MBP-&MQC040-352426 EG1019-22MBP-&MQC040-352427 EG1019-22MBP-&MQC040-352428 EG1019-22MBP-&MQC040-352429 EG1019-22MBP-&MQC040-352430
508320341 508320358 508320365 508320372 508320389 508320396 508320402 508320419 508320426 508320433 508320440 508320457 508320464
Quality Test Sheet - Control Valve, Fuel Gas, Stage A Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage B Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage C Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage D
FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048
2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24
Originator: [ADM]
-
Page 17 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-22MBP-&MQC040-352431 EG1019-22MBP-&MQC040-352432 EG1019-22MBP-&MQC040-352433 EG1019-12MBP-&MQC040-352454 EG1019-12MBP-&MQC040-352455 EG1019-12MBP-&MQC040-352456 EG1019-12MBP-&MQC040-352457 EG1019-12MBP-&MQC040-352458 EG1019-12MBP-&MQC040-352459 EG1019-12MBP-&MQC040-352460 EG1019-12MBP-&MQC040-352461 EG1019-12MBP-&MQC040-352462 EG1019-12MBP-&MQC040-352463 EG1019-12MBP-&MQC040-352464 EG1019-12MBP-&MQC040-352465 EG1019-12MBP-&MQC040-352466 EG1019-12MBP-&MQC040-352467 EG1019-12MBP-&MQC040-352468 EG1019-12MBP-&MQC040-352469 EG1019-12MBP-&MQC040-352470 EG1019-12MBP-&MQC040-352471 EG1019-12MBP-&MQC040-352472 EG1019-12MBP-&MQC040-352473 EG1019-11MBP-&MQC040-352474 EG1019-11MBP-&MQC040-352475 EG1019-11MBP-&MQC040-352476 EG1019-11MBP-&MQC040-352477 EG1019-11MBP-&MQC040-352478 EG1019-11MBP-&MQC040-352479 EG1019-11MBP-&MQC040-352480 EG1019-11MBP-&MQC040-352481 EG1019-11MBP-&MQC040-352482 EG1019-11MBP-&MQC040-352483 EG1019-11MBP-&MQC040-352484 EG1019-11MBP-&MQC040-352485 EG1019-11MBP-&MQC040-352486 EG1019-11MBP-&MQC040-352487 EG1019-11MBP-&MQC040-352488 EG1019-11MBP-&MQC040-352489 EG1019-11MBP-&MQC040-352490 EG1019-11MBP-&MQC040-352491 EG1019-11MBP-&MQC040-352492 EG1019-11MBP-&MQC040-352493 EG1019-42MB-&MQC040-351829 EG1019-42MB-&MQC040-351832 EG1019-42MB-&MQC040-351833
508320471 508320488 508320495 508327135 508327142 508327159 508327166 508327173 508327180 508327197 508327401 508327418 508327425 508327432 508327449 508327456 508327463 508327470 508327487 508327494 508327500 508327517 508327524 508327586 508327593 508327807 508327814 508327821 508327838 508327845 508327852 508327869 508327876 508327883 508327890 508327906 508327913 508327920 508327937 508327944 508327951 508327968 508327975 503428769 503550767 503550774
&MQC040
EG1019-42MB-&MQC040-351834
503550781 -
Originator: [ADM]
-
Document Title
Status
Purp
Letter No
Delivery Date
Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Pilot Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage A Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage B Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage C Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage D Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Pilot Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage A Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage B Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage C Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage D Declaration of Conformity Test Record Characteristic Curve Factory Assembly 800861 Cover Table of contents
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051
2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-25 2017-07-25 2017-07-25
Witness program
FR
INFO
2015_22-SAG-EEHC-T-001051
2017-07-25
Page 18 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MQC040 &MQC040 &MQC040
EG1019-42MB-&MQC040-351835 EG1019-42MB-&MQC040-351836 EG1019-42MB-&MQC040-351837
503550798 503551009 503551016 -
Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6
FR FR FR
INFO INFO INFO
2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051
2017-07-25 2017-07-25 2017-07-25
&MQC040 &MQC040
EG1019-42MB-&MQC040-351838 EG1019-42MB-&MQC040-351839
503551023 503551030 -
Compressor blades stages 7 - 13 Torque discs part 1 - 3
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051
2017-07-25 2017-07-25
&MQC040 &MQC040
EG1019-42MB-&MQC040-351840 EG1019-42MB-&MQC040-351841
503551047 503551054 -
Turbine discs stages 1 - 2 Turbine discs stages 3 - 4
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051
2017-07-25 2017-07-25
&MQC040
EG1019-42MB-&MQC040-351842
503551061 -
Spacer discs part 1 - 4
FR
INFO
2015_22-SAG-EEHC-T-001051
2017-07-25
&MQC040
EG1019-42MB-&MQC040-351843
503551078 -
Turbine blades Stage 1
FR
INFO
2015_22-SAG-EEHC-T-001051
2017-07-25
&MQC040
EG1019-42MB-&MQC040-351844
503551085 -
Turbine blades Stage 2
FR
INFO
2015_22-SAG-EEHC-T-001051
2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-42MB-&MQC040-351845 EG1019-42MB-&MQC040-351846 EG1019-42MB-&MQC040-351847 EG1019-42MB-&MQC040-351848 EG1019-42MB-&MQC040-351849 EG1019-42MB-&MQC040-351850 EG1019-42MB-&MQC040-351851 EG1019-42MB-&MQC040-351852 EG1019-42MB-&MQC040-351853 EG1019-42MB-&MQC040-351854 EG1019-42MB-&MQC040-351855 EG1019-42MB-&MQC040-351856 EG1019-42MB-&MQC040-351857 EG1019-42MB-&MQC040-351858 EG1019-42MB-&MQC040-351859 EG1019-42MB-&MQC040-351860 EG1019-42MB-&MQC040-351861 EG1019-42MB-&MQC040-351862 EG1019-42MB-&MQC040-351863 EG1019-42MB-&MQC040-351864 EG1019-42MB-&MQC040-351865 EG1019-42MB-&MQC040-351866 EG1019-42MB-&MQC040-351867 EG1019-42MB-&MQC040-351868 EG1019-42MB-&MQC040-351869 EG1019-42MB-&MQC040-351870 EG1019-42MB-&MQC040-351910 EG1019-11MB-&MQC040-352035 EG1019-11MB-&MQC040-352036 EG1019-11MB-&MQC040-352037 EG1019-11MB-&MQC040-352038
503551092 503551108 503551115 503551122 503551139 503551146 503551153 503551160 503551177 503551184 503551191 503551207 503551214 503551221 503551238 503551245 503551252 503551269 503551276 503551283 503551290 503551306 503551313 503551320 503551337 503551344 508314753 508318829 508318836 508318843 508318850
Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut Rotor assembly Compressor Inlet casing Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3 Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Outer Diffuser Inner Diffuser Turbine exhaust casing Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing Gas turbine complete Manufacturer’s Declaration Manufacturer’s Declaration Cover Table of contents Witness program
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
Originator: [ADM]
-
Page 19 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13 Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4 Spacer discs part 1 - 4 Turbine blades Stage 1 Turbine blades Stage 2 Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut Rotor assembly Bearing Housing, Compressor Bearing Body, Compressor Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3 Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Outer Diffuser Inner Diffuser Bearing Housing, Turbine Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
508319338 -
Gas turbine complete
FR
INFO
2015_22-SAG-EEHC-T-001052
2017-07-25
EG1019-11MB-&MQC040-352079
508319505 -
Factory Assembly MB000132
FR
INFO
2015_22-SAG-EEHC-T-001052
2017-07-25
&MQC040
EG1019-12MB-&MQC040-351994
508316986 -
Manufacturer’s Declaration
FR
INFO
2015_22-SAG-EEHC-T-001053
2017-07-25
&MQC040
EG1019-12MB-&MQC040-351995
508316993 -
Cover
FR
INFO
2015_22-SAG-EEHC-T-001053
2017-07-25
&MQC040
EG1019-12MB-&MQC040-351996
508317006 -
Table of contents
FR
INFO
2015_22-SAG-EEHC-T-001053
2017-07-25
&MQC040
EG1019-12MB-&MQC040-351997
508317013 -
Witness program
FR
INFO
2015_22-SAG-EEHC-T-001053
2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-11MB-&MQC040-352039 EG1019-11MB-&MQC040-352040 EG1019-11MB-&MQC040-352041 EG1019-11MB-&MQC040-352042 EG1019-11MB-&MQC040-352043 EG1019-11MB-&MQC040-352044 EG1019-11MB-&MQC040-352045 EG1019-11MB-&MQC040-352046 EG1019-11MB-&MQC040-352047 EG1019-11MB-&MQC040-352048 EG1019-11MB-&MQC040-352049 EG1019-11MB-&MQC040-352050 EG1019-11MB-&MQC040-352051 EG1019-11MB-&MQC040-352052 EG1019-11MB-&MQC040-352053 EG1019-11MB-&MQC040-352054 EG1019-11MB-&MQC040-352055 EG1019-11MB-&MQC040-352056 EG1019-11MB-&MQC040-352057 EG1019-11MB-&MQC040-352058 EG1019-11MB-&MQC040-352059 EG1019-11MB-&MQC040-352060 EG1019-11MB-&MQC040-352061 EG1019-11MB-&MQC040-352062 EG1019-11MB-&MQC040-352063 EG1019-11MB-&MQC040-352064 EG1019-11MB-&MQC040-352065 EG1019-11MB-&MQC040-352066 EG1019-11MB-&MQC040-352067 EG1019-11MB-&MQC040-352068 EG1019-11MB-&MQC040-352069 EG1019-11MB-&MQC040-352070 EG1019-11MB-&MQC040-352071 EG1019-11MB-&MQC040-352072 EG1019-11MB-&MQC040-352073 EG1019-11MB-&MQC040-352074
508318867 508318874 508318881 508318898 508318904 508318911 508318928 508318935 508318942 508318959 508318966 508318973 508318980 508318997 508319109 508319116 508319123 508319130 508319154 508319161 508319178 508319185 508319192 508319208 508319215 508319222 508319239 508319246 508319253 508319260 508319277 508319284 508319291 508319307 508319314 508319321
&MQC040
EG1019-11MB-&MQC040-352075
&MQC040
Originator: [ADM]
-
Page 20 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13 Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4 Spacer discs part 1 - 4 Turbine blades Stage 1 Turbine blades Stage 2
FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
508317129 -
Turbine blades stage 3
FR
INFO
2015_22-SAG-EEHC-T-001053
2017-07-25
EG1019-12MB-&MQC040-352009
508317136 -
Turbine blades stage 4
FR
INFO
2015_22-SAG-EEHC-T-001053
2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-12MB-&MQC040-352010 EG1019-12MB-&MQC040-352011 EG1019-12MB-&MQC040-352012 EG1019-12MB-&MQC040-352013 EG1019-12MB-&MQC040-352014 EG1019-12MB-&MQC040-352015 EG1019-12MB-&MQC040-352016 EG1019-12MB-&MQC040-352017 EG1019-12MB-&MQC040-352018 EG1019-12MB-&MQC040-352019 EG1019-12MB-&MQC040-352020 EG1019-12MB-&MQC040-352021 EG1019-12MB-&MQC040-352022 EG1019-12MB-&MQC040-352023 EG1019-12MB-&MQC040-352024 EG1019-12MB-&MQC040-352025 EG1019-12MB-&MQC040-352026 EG1019-12MB-&MQC040-352027 EG1019-12MB-&MQC040-352028 EG1019-12MB-&MQC040-352029 EG1019-12MB-&MQC040-352030
508317143 508317150 508317167 508317174 508317181 508317198 508317204 508317211 508317228 508317235 508317242 508317259 508317266 508317273 508317280 508317297 508317303 508317310 508317327 508317334 508317341
Rear hollow shaft Tie rod Tie rod nut Rotor assembly Bearing Housing, Compressor Bearing Body, Compressor Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3 Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Outer Diffuser Inner Diffuser Bearing Housing, Turbine Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MQC040 &MQC040
EG1019-12MB-&MQC040-352031 EG1019-12MB-&MQC040-352032
508317358 508317365 -
Turbine vanes stages 4 Cylinder Outer Casing
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053
2017-07-25 2017-07-25
&MQC040
EG1019-12MB-&MQC040-352033
508317372 -
Cone Outer Casing
FR
INFO
2015_22-SAG-EEHC-T-001053
2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040
EG1019-12MB-&MQC040-352034 EG1019-12MB-&MQC040-352078 EG1019-21MB-&MQC040-351954 EG1019-21MB-&MQC040-351955
508317389 508319499 508316153 508316160
Gas turbine complete Factory Assembly MB000129 Manufacturer’s Declaration Cover
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054
2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MQC040
EG1019-21MB-&MQC040-351956
508316177 -
Table of contents
FR
INFO
2015_22-SAG-EEHC-T-001054
2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-12MB-&MQC040-351998 EG1019-12MB-&MQC040-351999 EG1019-12MB-&MQC040-352000 EG1019-12MB-&MQC040-352001 EG1019-12MB-&MQC040-352002 EG1019-12MB-&MQC040-352003 EG1019-12MB-&MQC040-352004 EG1019-12MB-&MQC040-352005 EG1019-12MB-&MQC040-352006 EG1019-12MB-&MQC040-352007
508317020 508317037 508317044 508317051 508317068 508317075 508317082 508317099 508317105 508317112
&MQC040
EG1019-12MB-&MQC040-352008
&MQC040
Originator: [ADM]
-
-
-
Page 21 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
Witness program Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13
FR FR FR FR FR
INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
508316337 508316344 508316351 -
Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4
FR FR FR
INFO INFO INFO
2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054
2017-07-25 2017-07-25 2017-07-25
EG1019-21MB-&MQC040-351965 EG1019-21MB-&MQC040-351966 EG1019-21MB-&MQC040-351967 EG1019-21MB-&MQC040-351968 EG1019-21MB-&MQC040-351969 EG1019-21MB-&MQC040-351970 EG1019-21MB-&MQC040-351971 EG1019-21MB-&MQC040-351972 EG1019-21MB-&MQC040-351973 EG1019-21MB-&MQC040-351974 EG1019-21MB-&MQC040-351975 EG1019-21MB-&MQC040-351976 EG1019-21MB-&MQC040-351977 EG1019-21MB-&MQC040-351978 EG1019-21MB-&MQC040-351979 EG1019-21MB-&MQC040-351980 EG1019-21MB-&MQC040-351981 EG1019-21MB-&MQC040-351982 EG1019-21MB-&MQC040-351983 EG1019-21MB-&MQC040-351984 EG1019-21MB-&MQC040-351985 EG1019-21MB-&MQC040-351986 EG1019-21MB-&MQC040-351987 EG1019-21MB-&MQC040-351988 EG1019-21MB-&MQC040-351989 EG1019-21MB-&MQC040-351990 EG1019-21MB-&MQC040-351991 EG1019-21MB-&MQC040-351992 EG1019-21MB-&MQC040-351993 EG1019-21MB-&MQC040-352077
508316368 508316375 508316382 508316399 508316405 508316412 508316429 508316436 508316443 508316450 508316467 508316474 508316481 508316498 508316504 508316511 508316528 508316535 508316542 508316559 508316566 508316573 508316580 508316597 508316702 508316719 508316726 508316733 508316740 508319482
Spacer discs part 1 - 4 Turbine blades Stage 1 Turbine blades Stage 2 Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut Rotor assembly Compressor Inlet casing Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3 Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Outer Diffuser Inner Diffuser Turbine exhaust casing Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing Gas turbine complete Factory Assembly MB000125
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MQC040
EG1019-22MB-&MQC040-351914
508315613 -
Manufacturer’s Declaration
FR
INFO
2015_22-SAG-EEHC-T-001055
2017-07-25
&MQC040
EG1019-22MB-&MQC040-351915
508315620 -
Cover
FR
INFO
2015_22-SAG-EEHC-T-001055
2017-07-25
&MQC040 &MQC040 &MQC040
EG1019-22MB-&MQC040-351916 EG1019-22MB-&MQC040-351917 EG1019-22MB-&MQC040-351918
508315637 508315644 508315651 -
Table of contents Witness program Front hollow shaft
FR FR FR
INFO INFO INFO
2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055
2017-07-25 2017-07-25 2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-21MB-&MQC040-351957 EG1019-21MB-&MQC040-351958 EG1019-21MB-&MQC040-351959 EG1019-21MB-&MQC040-351960 EG1019-21MB-&MQC040-351961
508316184 508316191 508316306 508316313 508316320
&MQC040 &MQC040 &MQC040
EG1019-21MB-&MQC040-351962 EG1019-21MB-&MQC040-351963 EG1019-21MB-&MQC040-351964
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
Originator: [ADM]
-
-
Page 22 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-22MB-&MQC040-351919 EG1019-22MB-&MQC040-351920 EG1019-22MB-&MQC040-351921 EG1019-22MB-&MQC040-351922 EG1019-22MB-&MQC040-351923 EG1019-22MB-&MQC040-351924 EG1019-22MB-&MQC040-351925 EG1019-22MB-&MQC040-351926 EG1019-22MB-&MQC040-351927 EG1019-22MB-&MQC040-351928 EG1019-22MB-&MQC040-351929 EG1019-22MB-&MQC040-351930 EG1019-22MB-&MQC040-351931 EG1019-22MB-&MQC040-351932 EG1019-22MB-&MQC040-351933 EG1019-22MB-&MQC040-351934
508315668 508315675 508315682 508315699 508315705 508315712 508315729 508315736 508315743 508315750 508315767 508315774 508315781 508315798 508315804 508315811
-
Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13 Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4 Spacer discs part 1 - 4 Turbine blades Stage 1 Turbine blades Stage 2 Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut Rotor assembly Compressor Inlet casing
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-22MB-&MQC040-351935 EG1019-22MB-&MQC040-351936 EG1019-22MB-&MQC040-351937 EG1019-22MB-&MQC040-351938 EG1019-22MB-&MQC040-351939 EG1019-22MB-&MQC040-351940 EG1019-22MB-&MQC040-351941 EG1019-22MB-&MQC040-351942 EG1019-22MB-&MQC040-351943 EG1019-22MB-&MQC040-351944 EG1019-22MB-&MQC040-351945 EG1019-22MB-&MQC040-351946 EG1019-22MB-&MQC040-351947 EG1019-22MB-&MQC040-351948 EG1019-22MB-&MQC040-351949 EG1019-22MB-&MQC040-351950 EG1019-22MB-&MQC040-351951 EG1019-22MB-&MQC040-351952 EG1019-22MB-&MQC040-351953 EG1019-22MB-&MQC040-352076 EG1019-31MB-&MQC040-351831 EG1019-31MB-&MQC040-351871 EG1019-31MB-&MQC040-351872 EG1019-31MB-&MQC040-351873 EG1019-31MB-&MQC040-351874 EG1019-31MB-&MQC040-351875 EG1019-31MB-&MQC040-351876 EG1019-31MB-&MQC040-351877 EG1019-31MB-&MQC040-351878 EG1019-31MB-&MQC040-351879 EG1019-31MB-&MQC040-351880 EG1019-31MB-&MQC040-351881
508315828 508315835 508315842 508315859 508315866 508315873 508315880 508315897 508315903 508315910 508315927 508315934 508315941 508315958 508315965 508315972 508315989 508315996 508316009 508319475 503428783 503551375 503551382 503551399 503551405 503551412 503551429 503551436 503551443 503551450 503551467 503551474
-
Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3 Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Outer Diffuser Inner Diffuser Turbine exhaust casing Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing Gas turbine complete Factory Assembly MB000126 Factory Assembly MB000081 Cover Table of contents Witness program Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13 Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4 Spacer discs part 1 - 4
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
Originator: [ADM]
Page 23 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-31MB-&MQC040-351882 EG1019-31MB-&MQC040-351883 EG1019-31MB-&MQC040-351884 EG1019-31MB-&MQC040-351885 EG1019-31MB-&MQC040-351886 EG1019-31MB-&MQC040-351887 EG1019-31MB-&MQC040-351888 EG1019-31MB-&MQC040-351889 EG1019-31MB-&MQC040-351890 EG1019-31MB-&MQC040-351891 EG1019-31MB-&MQC040-351892
503551481 503551498 503551504 503551511 503551528 503551535 503551542 503551559 503551566 503551573 503551580
-
Turbine blades Stage 1 Turbine blades Stage 2 Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut Rotor assembly Compressor Inlet casing Compressor vane carrier 1 Compressor vane carrier 2
FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MQC040
EG1019-31MB-&MQC040-351893
503551597 -
Compressor vane carrier 3
FR
INFO
2015_22-SAG-EEHC-T-001056
2017-07-25
&MQC040
EG1019-31MB-&MQC040-351894
503551603 -
Compressor vane carrier 4
FR
INFO
2015_22-SAG-EEHC-T-001056
2017-07-25
&MQC040
EG1019-31MB-&MQC040-351895
503551610 -
Compressor vanes stages 0 - 3
FR
INFO
2015_22-SAG-EEHC-T-001056
2017-07-25
&MQC040 &MQC040
EG1019-31MB-&MQC040-351896 EG1019-31MB-&MQC040-351897
503551627 503551634 -
Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056
2017-07-25 2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-31MB-&MQC040-351898 EG1019-31MB-&MQC040-351899 EG1019-31MB-&MQC040-351900 EG1019-31MB-&MQC040-351901 EG1019-31MB-&MQC040-351902 EG1019-31MB-&MQC040-351903 EG1019-31MB-&MQC040-351904
503551641 503551658 503551665 503551672 503551689 503551696 503551702
-
Outer Diffuser Inner Diffuser Turbine exhaust casing Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2
FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-31MB-&MQC040-351905 EG1019-31MB-&MQC040-351906 EG1019-31MB-&MQC040-351907 EG1019-31MB-&MQC040-351908 EG1019-31MB-&MQC040-351909 EG1019-31MB-&MQC040-351913 EG1019-32MB-&MQC040-351789 EG1019-32MB-&MQC040-351790
503551719 503551726 503551733 503551740 503551757 508314784 503428257 503428264
-
Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing Gas turbine complete Manufacturer’s Declaration Cover Table of contents
FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-32MB-&MQC040-351791 EG1019-32MB-&MQC040-351792 EG1019-32MB-&MQC040-351793 EG1019-32MB-&MQC040-351794 EG1019-32MB-&MQC040-351795
503428271 503428288 503428295 503428400 503428417
-
Witness program Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13
FR FR FR FR FR
INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040
EG1019-32MB-&MQC040-351796 EG1019-32MB-&MQC040-351797 EG1019-32MB-&MQC040-351798 EG1019-32MB-&MQC040-351799
503428424 503428431 503428448 503428455
-
Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4 Spacer discs part 1 - 4
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057
2017-07-25 2017-07-25 2017-07-25 2017-07-25
Originator: [ADM]
Page 24 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-32MB-&MQC040-351800 EG1019-32MB-&MQC040-351801 EG1019-32MB-&MQC040-351802 EG1019-32MB-&MQC040-351803 EG1019-32MB-&MQC040-351804 EG1019-32MB-&MQC040-351805 EG1019-32MB-&MQC040-351806 EG1019-32MB-&MQC040-351807 EG1019-32MB-&MQC040-351808 EG1019-32MB-&MQC040-351809 EG1019-32MB-&MQC040-351810 EG1019-32MB-&MQC040-351811 EG1019-32MB-&MQC040-351812 EG1019-32MB-&MQC040-351813 EG1019-32MB-&MQC040-351814 EG1019-32MB-&MQC040-351815 EG1019-32MB-&MQC040-351816 EG1019-32MB-&MQC040-351817 EG1019-32MB-&MQC040-351818 EG1019-32MB-&MQC040-351819 EG1019-32MB-&MQC040-351820 EG1019-32MB-&MQC040-351821 EG1019-32MB-&MQC040-351822 EG1019-32MB-&MQC040-351823 EG1019-32MB-&MQC040-351824 EG1019-32MB-&MQC040-351825 EG1019-32MB-&MQC040-351826 EG1019-32MB-&MQC040-351827 EG1019-32MB-&MQC040-351830 EG1019-32MB-&MQC040-351912 EG1019-41MB-&MQC040-351751 EG1019-41MB-&MQC040-351752 EG1019-41MB-&MQC040-351753 EG1019-41MB-&MQC040-351754 EG1019-41MB-&MQC040-351755 EG1019-41MB-&MQC040-351756 EG1019-41MB-&MQC040-351757 EG1019-41MB-&MQC040-351758 EG1019-41MB-&MQC040-351759 EG1019-41MB-&MQC040-351760 EG1019-41MB-&MQC040-351761 EG1019-41MB-&MQC040-351762 EG1019-41MB-&MQC040-351763 EG1019-41MB-&MQC040-351764 EG1019-41MB-&MQC040-351765 EG1019-41MB-&MQC040-351766 EG1019-41MB-&MQC040-351767 EG1019-41MB-&MQC040-351768
Originator: [ADM]
UNID 503428462 503428479 503428486 503428493 503428509 503428516 503428523 503428530 503428547 503428554 503428561 503428578 503428585 503428592 503428608 503428615 503428622 503428639 503428646 503428653 503428660 503428677 503428684 503428691 503428707 503428714 503428721 503428738 503428776 508314777 503427250 503427267 503427274 503427281 503427298 503427908 503427915 503427922 503427939 503427946 503427953 503427960 503427977 503427984 503427991 503428004 503428011 503428028
Rev. A -
Document Title Turbine blades Stage 1 Turbine blades Stage 2 Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut Rotor assembly Compressor Inlet casing Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3 Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Outer Diffuser Inner Diffuser Turbine exhaust casing Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing Gas turbine complete Factory Assembly MB000030 Manufacturer’s Declaration Cover Table of contents Witness program Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13 Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4 Spacer discs part 1 - 4 Turbine blades Stage 1 Turbine blades Stage 2 Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut
Page 25 of 33
Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
Letter No 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058
Delivery Date 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-41MB-&MQC040-351769 EG1019-41MB-&MQC040-351770 EG1019-41MB-&MQC040-351771 EG1019-41MB-&MQC040-351772 EG1019-41MB-&MQC040-351773 EG1019-41MB-&MQC040-351774 EG1019-41MB-&MQC040-351775
503428035 503428042 503428059 503428066 503428073 503428080 503428097
-
Rotor assembly Compressor Inlet casing Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3
FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040
EG1019-41MB-&MQC040-351776 EG1019-41MB-&MQC040-351777 EG1019-41MB-&MQC040-351778 EG1019-41MB-&MQC040-351779
503428103 503428110 503428127 503428134
-
Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Inner Diffuser Turbine exhaust casing
FR FR FR FR
INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058
2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MAB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MTB030 &MTB030 &MTB030 &MAB010 &MPB010 &MPB010 &MPB010 &MPB010
EG1019-41MB-&MQC040-351780 EG1019-41MB-&MQC040-351781 EG1019-41MB-&MQC040-351782 EG1019-41MB-&MQC040-351783 EG1019-41MB-&MQC040-351784 EG1019-41MB-&MQC040-351785 EG1019-41MB-&MQC040-351786 EG1019-41MB-&MQC040-351787 EG1019-41MB-&MQC040-351788 EG1019-41MB-&MQC040-351828 EG1019-41MB-&MQC040-351911 EG1019-12MB-&MAB010-351177 EG1019-12MB-&MPB010-351178 EG1019-12MB-&MPB010-351179 EG1019-12MB-&MPB010-351180 EG1019-12MB-&MPB010-351181 EG1019-12MB-&MPB010-351182 EG1019-12MB-&MPB010-351186 EG1019-12MB-&MTB030-351183 EG1019-12MB-&MTB030-351184 EG1019-12MB-&MTB030-351185 EG1019-21MB-&MAB010-351164 EG1019-21MB-&MPB010-351165 EG1019-21MB-&MPB010-351166 EG1019-21MB-&MPB010-351167 EG1019-21MB-&MPB010-351168
503428141 503428158 503428165 503428172 503428189 503428196 503428202 503428219 503428226 503428752 508314760 508243046 508243053 508243060 508243077 508243084 508243091 508243138 508243107 508243114 508243121 508242919 508242926 508242933 508242940 508242957
-
Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing Gas turbine complete Factory Assembly 800860 Manufacturer’s Declaration Table of Contents Allocation Table, Component Class to GPC Allocation Table, GPC to Component Class Reference List for Spare Parts List Reference Table (ordered by Functional Unit No.) Reference Table (ordered alphabetically) Spare Parts List General Overview Core Turbine Auxiliaries Table of Contents Allocation Table, Component Class to GPC Allocation Table, GPC to Component Class Reference List for Spare Parts List Reference Table (ordered by Functional Unit No.)
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MPB010
EG1019-21MB-&MPB010-351169
508242964 -
Reference Table (ordered alphabetically)
FR
INFO
2015_22-SAG-EEHC-T-001059
2017-07-25
&MPB010
EG1019-21MB-&MPB010-351173
508243008 -
Spare Parts List
FR
INFO
2015_22-SAG-EEHC-T-001059
2017-07-25
&MPB010
EG1019-21MB-&MPB010-351174
508243015 -
WB Item-ID to Item-ID, TIN and Item Position
FR
INFO
2015_22-SAG-EEHC-T-001059
2017-07-25
Originator: [ADM]
Page 26 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MPB010
EG1019-21MB-&MPB010-351175
508243022 -
Item-ID to WB Item-ID, TIN and Item Position
FR
INFO
2015_22-SAG-EEHC-T-001059
2017-07-25
&MTB030 &MTB030
EG1019-21MB-&MTB030-351170 EG1019-21MB-&MTB030-351171
508242971 508242988 -
General Overview Core Turbine
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059
2017-07-25 2017-07-25
&MTB030 &MTB030
EG1019-21MB-&MTB030-351172 EG1019-21MB-&MTB030-351176
508242995 508243039 -
Auxiliaries Spare Parts Drawings
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059
2017-07-25 2017-07-25
&MAB010
EG1019-22MB-&MAB010-351151
508242377 -
Table of Contents
FR
INFO
2015_22-SAG-EEHC-T-001059
2017-07-25
&MPB010
EG1019-22MB-&MPB010-351152
508242384 -
Allocation Table, Component Class to GPC
FR
INFO
2015_22-SAG-EEHC-T-001059
2017-07-25
&MPB010
EG1019-22MB-&MPB010-351153
508242391 -
Allocation Table, GPC to Component Class
FR
INFO
2015_22-SAG-EEHC-T-001059
2017-07-25
&MPB010
EG1019-22MB-&MPB010-351154
508242803 -
Reference List for Spare Parts List
FR
INFO
2015_22-SAG-EEHC-T-001059
2017-07-25
&MPB010
EG1019-22MB-&MPB010-351155
508242810 -
Reference Table (ordered by Functional Unit No.)
FR
INFO
2015_22-SAG-EEHC-T-001059
2017-07-25
&MPB010
EG1019-22MB-&MPB010-351156
508242827 -
Reference Table (ordered alphabetically)
FR
INFO
2015_22-SAG-EEHC-T-001059
2017-07-25
&MPB010 &MPB010 &MPB010 &MTB030 &MTB030 &MTB030 &MTB030 &MDB060 &MDB060 &MDB060 &MDB060 &MPA020 &MPA030 &MPA030 &MAB010 &MAB010 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010
EG1019-22MB-&MPB010-351160 EG1019-22MB-&MPB010-351161 EG1019-22MB-&MPB010-351162 EG1019-22MB-&MTB030-351157 EG1019-22MB-&MTB030-351158 EG1019-22MB-&MTB030-351159 EG1019-22MB-&MTB030-351163 EG1019-MB-&MDB060-351004 EG1019-MB-&MDB060-351070 EG1019-MB-&MDB060-351072 EG1019-MB-&MDB060-351074 EG1019-MB-&MPA020-351071 EG1019-MB-&MPA030-351069 EG1019-MB-&MPA030-351073 EG1019-11MB-&MAB010-351190 EG1019-11MB-&MAB010-351326 EG1019-11MB-&MDB060-351324 EG1019-11MB-&MDB060-351325 EG1019-11MB-&MDB060-351327 EG1019-11MB-&MDB060-351328 EG1019-11MB-&MPB010-351191 EG1019-11MB-&MPB010-351192 EG1019-11MB-&MPB010-351193 EG1019-11MB-&MPB010-351194 EG1019-11MB-&MPB010-351195 EG1019-11MB-&MPB010-351199 EG1019-11MB-&MPB010-351200
508242872 508242889 508242896 508242834 508242841 508242858 508242902 503429056 503525970 503525994 503526014 503525987 503525963 503526007 508243312 508384565 508384534 508384541 508384589 508384602 508243329 508243336 508243343 508243350 508243367 508243404 508243411
Spare Parts List WB Item-ID to Item-ID, TIN and Item Position Item-ID to WB Item-ID, TIN and Item Position General Overview Core Turbine Auxiliaries Spare Parts Drawings Notes on Using the Spare Parts Catalog List of Measuring Instruments, Explanations List of Electrical Loads, Explanations Equipment List, Explanations List of Electrical Loads List of Measuring Instruments Equipment List Table of Contents Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions Code of Hand Signals Allocation Table, Component Class to GPC Allocation Table, GPC to Component Class Reference List for Spare Parts List Reference Table (ordered by Functional Unit No.) Reference Table (ordered alphabetically) Spare Parts List WB Item-ID to Item-ID, TIN and Item Position
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
Originator: [ADM]
A A A A A A A -
Page 27 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
&MPB010 &MPB010 &MTB030 &MTB030 &MTB030 &MTB030 &MTB030 &MAB010 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MPB010 &MPB010 &MTB030 &MTB030 &MAB010 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MTB030 &MAB010 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MTB030 &MAB010 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MTB030 &MAB010 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MTB030 &MAB010 &MDB060 &MDB060 &MDB060
EG1019-11MB-&MPB010-351201 EG1019-11MB-&MPB010-351329 EG1019-11MB-&MTB030-351196 EG1019-11MB-&MTB030-351197 EG1019-11MB-&MTB030-351198 EG1019-11MB-&MTB030-351202 EG1019-11MB-&MTB030-351330 EG1019-12MB-&MAB010-351319 EG1019-12MB-&MDB060-351317 EG1019-12MB-&MDB060-351318 EG1019-12MB-&MDB060-351320 EG1019-12MB-&MDB060-351321 EG1019-12MB-&MPB010-351187 EG1019-12MB-&MPB010-351188 EG1019-12MB-&MPB010-351322 EG1019-12MB-&MTB030-351189 EG1019-12MB-&MTB030-351323 EG1019-21MB-&MAB010-351312 EG1019-21MB-&MDB060-351310 EG1019-21MB-&MDB060-351311 EG1019-21MB-&MDB060-351313 EG1019-21MB-&MDB060-351314 EG1019-21MB-&MPB010-351315 EG1019-21MB-&MTB030-351316 EG1019-22MB-&MAB010-351305 EG1019-22MB-&MDB060-351303 EG1019-22MB-&MDB060-351304 EG1019-22MB-&MDB060-351306 EG1019-22MB-&MDB060-351307 EG1019-22MB-&MPB010-351308 EG1019-22MB-&MTB030-351309 EG1019-31MB-&MAB010-351298 EG1019-31MB-&MDB060-351296 EG1019-31MB-&MDB060-351297 EG1019-31MB-&MDB060-351299 EG1019-31MB-&MDB060-351300 EG1019-31MB-&MPB010-351301 EG1019-31MB-&MTB030-351302 EG1019-32MB-&MAB010-351291 EG1019-32MB-&MDB060-351289 EG1019-32MB-&MDB060-351290 EG1019-32MB-&MDB060-351292 EG1019-32MB-&MDB060-351293 EG1019-32MB-&MPB010-351294 EG1019-32MB-&MTB030-351295 EG1019-41MB-&MAB010-351250 EG1019-41MB-&MDB060-351248 EG1019-41MB-&MDB060-351249 EG1019-41MB-&MDB060-351251
Originator: [ADM]
UNID 508243428 508384619 508243374 508243381 508243398 508244265 508384633 508383612 508383193 508383605 508383629 508383636 508243145 508243152 508383643 508243169 508383650 508383148 508383124 508383131 508383155 508383162 508383179 508383186 508383070 508383056 508383063 508383087 508383094 508383100 508383117 508382776 508382752 508382769 508382783 508382790 508382905 508382912 508379578 508379554 508379561 508379585 508379592 508379806 508379813 508379011 508378199 508379004 508379028
Rev. -
Document Title Item-ID to WB Item-ID, TIN and Item Position Tool List MBTLD06 General Overview Core Turbine Auxiliaries Spare Parts Drawings Drawing MBTLD06 Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions Code of Hand Signals WB Item-ID to Item-ID, TIN and Item Position Item-ID to WB Item-ID, TIN and Item Position Tool List MBTLD06 Spare Parts Drawings Drawing MBTLD06 Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions Code of Hand Signals Tool List MBTLD06 Drawing MBTLD06 Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions Code of Hand Signals Tool List MBTLD06 Drawing MBTLD06 Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions Code of Hand Signals Tool List MBTLD06 Drawing MBTLD06 Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions Code of Hand Signals Tool List MBTLD06 Drawing MBTLD06 Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions
Page 28 of 33
Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
Letter No 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
Delivery Date 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
Code of Hand Signals Operating Manual MBTLC02 Operating Manual MBTLC02 Tool Description MBTLB25 Operating Manual MBTLB25 Operating Manual MBTLB25 Operating Manual MBTLB25 Tool Description MBTLC74 Operating Manual MBTLC81 Operating Manual MBTLC81 Tool List MBTLB07 Tool List MBTLC02 Tool List MBTLC12 Tool List MBTLC21 Tool List MBTLC23 Tool List MBTLB25
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
508379257 -
Tool List MBTLC42
FR
INFO
2015_22-SAG-EEHC-T-001059-01
2017-07-25
EG1019-41MB-&MPB010-351278 EG1019-41MB-&MPB010-351283 EG1019-41MB-&MPB010-351287 EG1019-41MB-&MQC040-351262 EG1019-41MB-&MQC040-351265 EG1019-41MB-&MQC040-351271
508379288 508379332 508379370 508379127 508379158 508379219
-
Tool List MBTLC74 Tool List MBTLC81 Tool List MBTLD06 EC Declaration of Conformity MBTLC12 EC Declaration of Conformity MBTLC21 Quality Documentation for tools MBTLB25
FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MQC040
EG1019-41MB-&MQC040-351277
508379271 -
Quality Documentation for tools MBTLC42
FR
INFO
2015_22-SAG-EEHC-T-001059-01
2017-07-25
&MQC040
EG1019-41MB-&MQC040-351281
508379318 -
EC Declaration of Conformity MBTLC74
FR
INFO
2015_22-SAG-EEHC-T-001059-01
2017-07-25
&MQC040
EG1019-41MB-&MQC040-351282
508379325 -
Quality Documentation for tools MBTLC74
FR
INFO
2015_22-SAG-EEHC-T-001059-01
2017-07-25
&MTB030 &MTB030
EG1019-41MB-&MTB030-351255 EG1019-41MB-&MTB030-351257
508379059 508379073 -
Drawing MBTLB07 Drawing MBTLC02
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
2017-07-25 2017-07-25
&MTB030
EG1019-41MB-&MTB030-351261
508379110 -
Drawing MBTLC12
FR
INFO
2015_22-SAG-EEHC-T-001059-01
2017-07-25
&MTB030 &MTB030 &MTB030
EG1019-41MB-&MTB030-351264 EG1019-41MB-&MTB030-351267 EG1019-41MB-&MTB030-351269
508379141 508379172 508379196 -
Drawing MBTLC21 Drawing MBTLC23 Drawing MBTLB25
FR FR FR
INFO INFO INFO
2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
2017-07-25 2017-07-25 2017-07-25
&MTB030 &MTB030 &MTB030 &MTB030 &MAB010 &MDB060
EG1019-41MB-&MTB030-351276 EG1019-41MB-&MTB030-351279 EG1019-41MB-&MTB030-351284 EG1019-41MB-&MTB030-351288 EG1019-42MB-&MAB010-351206 EG1019-MB-&MDB060-351004
508379264 508379295 508379349 508379387 508335130 503429056
Drawing MBTLC42 Drawing MBTLC74 Drawing MBTLC81 Drawing MBTLD06 Table of Contents Notes on Using the Spare Parts Catalog
FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010
EG1019-41MB-&MDB060-351253 EG1019-41MB-&MDB060-351258 EG1019-41MB-&MDB060-351259 EG1019-41MB-&MDB060-351270 EG1019-41MB-&MDB060-351272 EG1019-41MB-&MDB060-351273 EG1019-41MB-&MDB060-351274 EG1019-41MB-&MDB060-351280 EG1019-41MB-&MDB060-351285 EG1019-41MB-&MDB060-351286 EG1019-41MB-&MPB010-351254 EG1019-41MB-&MPB010-351256 EG1019-41MB-&MPB010-351260 EG1019-41MB-&MPB010-351263 EG1019-41MB-&MPB010-351266 EG1019-41MB-&MPB010-351268
508379035 508379080 508379097 508379202 508379226 508379233 508379240 508379301 508379356 508379363 508379042 508379066 508379103 508379134 508379165 508379189
&MPB010
EG1019-41MB-&MPB010-351275
&MPB010 &MPB010 &MPB010 &MQC040 &MQC040 &MQC040
Originator: [ADM]
-
A
Page 29 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
UNID
Rev.
Document Title
Status
Purp
Letter No
Delivery Date
&MDB060 &MDB060
EG1019-42MB-&MDB060-351203 EG1019-42MB-&MDB060-351204
508335116 508335123 -
Preface Notes on Using the Tool Catalog
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
2017-07-25 2017-07-25
&MDB060 &MDB060
EG1019-42MB-&MDB060-351207 EG1019-42MB-&MDB060-351208
508335147 508335154 -
Safety Instructions Code of Hand Signals
FR FR
INFO INFO
2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
2017-07-25 2017-07-25
&MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060
EG1019-42MB-&MDB060-351213 EG1019-42MB-&MDB060-351214 EG1019-42MB-&MDB060-351229 EG1019-42MB-&MDB060-351231 EG1019-42MB-&MDB060-351232 EG1019-42MB-&MDB060-351233
508335208 508335215 508335369 508335383 508335390 508335406
Operating Manual MBTLC02 Operating Manual MBTLC02 Tool Description MBTLC25 Operating Manual MBTLC25 Operating Manual MBTLC25 Operating Manual MBTLC25
FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MDB060
EG1019-42MB-&MDB060-351239
508335468 -
Tool Description MBTLC74
FR
INFO
2015_22-SAG-EEHC-T-001059-01
2017-07-25
&MDB060
EG1019-42MB-&MDB060-351244
508335512 -
Operating Manual MBTLC81
FR
INFO
2015_22-SAG-EEHC-T-001059-01
2017-07-25
&MDB060
EG1019-42MB-&MDB060-351245
508335529 -
Operating Manual MBTLC81
FR
INFO
2015_22-SAG-EEHC-T-001059-01
2017-07-25
&MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MQC040 &MQC040 &MQC040 &MQC040
EG1019-42MB-&MPB010-351209 EG1019-42MB-&MPB010-351211 EG1019-42MB-&MPB010-351215 EG1019-42MB-&MPB010-351217 EG1019-42MB-&MPB010-351220 EG1019-42MB-&MPB010-351222 EG1019-42MB-&MPB010-351225 EG1019-42MB-&MPB010-351227 EG1019-42MB-&MPB010-351234 EG1019-42MB-&MPB010-351237 EG1019-42MB-&MPB010-351242 EG1019-42MB-&MPB010-351246 EG1019-42MB-&MQC040-351219 EG1019-42MB-&MQC040-351224 EG1019-42MB-&MQC040-351230 EG1019-42MB-&MQC040-351236
508335161 508335185 508335222 508335246 508335277 508335291 508335321 508335345 508335413 508335444 508335499 508335536 508335260 508335314 508335376 508335437
-
Spare Parts List MBTLB07 Spare Parts List MBTLC02 Spare Parts List MBTLC11 Spare Parts List MBTLC12 Spare Parts List MBTLC13 Spare Parts List MBTLC21 Spare Parts List MBTLC23 Spare Parts List MBTLC25 Spare Parts List MBTLC42 Spare Parts List MBTLC74 Spare Parts List MBTLC81 Spare Parts List MBTLD06 EC Declaration of Conformity MBTLC12 EC Declaration of Conformity MBTLC21 Quality Documentation for tools MBTLC25 Quality Documentation for tools MBTLC42
FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25
&MQC040 &MQC040 &MTB030
EG1019-42MB-&MQC040-351240 EG1019-42MB-&MQC040-351241 EG1019-42MB-&MTB030-351210
508335475 508335482 508335178 -
EC Declaration of Conformity MBTLC74 Quality Documentation for tools MBTLC74 Tool Drawing MBTLB07
FR FR FR
INFO INFO INFO
2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
2017-07-25 2017-07-25 2017-07-25
&MTB030
EG1019-42MB-&MTB030-351212
508335192 -
Tool Drawing MBTLC02
FR
INFO
2015_22-SAG-EEHC-T-001059-01
2017-07-25
&MTB030
EG1019-42MB-&MTB030-351216
508335239 -
Tool Drawing MBTLC11
FR
INFO
2015_22-SAG-EEHC-T-001059-01
2017-07-25
&MTB030
EG1019-42MB-&MTB030-351218
508335253 -
Tool Drawing MBTLC12
FR
INFO
2015_22-SAG-EEHC-T-001059-01
2017-07-25
&MTB030 &MTB030 &MTB030
EG1019-42MB-&MTB030-351221 EG1019-42MB-&MTB030-351223 EG1019-42MB-&MTB030-351226
508335284 508335307 508335338 -
Tool Drawing MBTLC13 Tool Drawing MBTLC21 Tool Drawing MBTLC23
FR FR FR
INFO INFO INFO
2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01
2017-07-25 2017-07-25 2017-07-25
Originator: [ADM]
-
Page 30 of 33
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
&MTB030 &MTB030 &MTB030 &MTB030 &MTB030 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040
EG1019-42MB-&MTB030-351228 EG1019-42MB-&MTB030-351235 EG1019-42MB-&MTB030-351238 EG1019-42MB-&MTB030-351243 EG1019-42MB-&MTB030-351247 EG1019-11BBA-&EQC040-721086 EG1019-11BBA-&EQC040-721087 EG1019-11BBA-&EQC040-721088 EG1019-11BBA-&EQC040-721089 EG1019-12BBA-&EQC040-721091 EG1019-12BBA-&EQC040-721092 EG1019-12BBA-&EQC040-721093 EG1019-12BBA-&EQC040-721094 EG1019-00BHA-&EQC040-723129 EG1019-00BHB-&EQC040-723130 EG1019-00BHC-&EQC040-723131 EG1019-00BHD-&EQC040-723132 EG1019-00BMA-&EQC040-723133 EG1019-00BUA-&EQC040-723134 EG1019-00BUB-&EQC040-723135 EG1019-10BFA-&EQC040-723136 EG1019-10BFB-&EQC040-723137 EG1019-10BMA-&EQC040-723138 EG1019-10BUA-&EQC040-723139 EG1019-10BUB-&EQC040-723140 EG1019-B-&EQC010-723172 EG1019-11BFF-&EQC040-723141 EG1019-11BMF-&EQC040-723142 EG1019-B-&EQC010-723172 EG1019-12BFF-&EQC040-723143 EG1019-12BMF-&EQC040-723144 EG1019-B-&EQC010-723172 EG1019-20BFA-&EQC040-723145 EG1019-20BFB-&EQC040-723146 EG1019-20BMA-&EQC040-723147 EG1019-20BUA-&EQC040-723148 EG1019-20BUB-&EQC040-723149 EG1019-B-&EQC010-723172 EG1019-21BFF-&EQC040-723150 EG1019-21BMF-&EQC040-723151 EG1019-B-&EQC010-723172 EG1019-22BFF-&EQC040-723152 EG1019-22BMF-&EQC040-723153 EG1019-B-&EQC010-723172 EG1019-30BFA-&EQC040-723154 EG1019-30BFB-&EQC040-723155 EG1019-30BMA-&EQC040-723156 EG1019-30BUA-&EQC040-723157 EG1019-30BUB-&EQC040-723158
Originator: [ADM]
UNID 508335352 508335420 508335451 508335505 508335543 449335398 449335404 449335411 449335428 449335442 449335459 449335466 449335473 505628921 505628938 505628945 505628952 505628969 505628976 505628983 449334773 449334780 449334797 449334803 449334810 449335367 449334827 449334834 449335367 449334841 449334858 449335367 449334865 449334872 449334889 449334896 449334902 449335367 449334919 449334926 449335367 449334933 449334940 449335367 449334957 449334964 449334971 449334988 449334995
Rev. A A A A A A A -
Document Title Tool Drawing MBTLC25 Tool Drawing MBTLC42 Tool Drawing MBTLC74 Tool Drawing MBTLC81 Tool Drawing MBTLD06 Test Certificate 11BBA Test Reports Circuit Breakers Test Reports Current Transformers and Voltage Transformers Test Certificate Protection Relays Test Certificate 12BBA Test Reports Circuit Breakers Test Reports Current Transformers and Voltage Transformers Test Certificate Protection Relays Test Certificate 00BHA Test Certificate 00BHB Test Certificate 00BHC Test Certificate 00BHD Test Certificate 00BMA Test Certificate 00BUA Test Certificate 00BUB Test Certificate 10BFA Test Certificate 10BFB Test Certificate 10BMA Test Certificate 10BUA Test Certificate 10BUB Declaration of Conformity Test Certificate 11BFF Test Certificate 11BMF Declaration of Conformity Test Certificate 12BFF Test Certificate 12BMF Declaration of Conformity Test Certificate 20BFA Test Certificate 20BFB Test Certificate 20BMA Test Certificate 20BUA Test Certificate 20BUB Declaration of Conformity Test Certificate 21BFF Test Certificate 21BMF Declaration of Conformity Test Certificate 22BFF Test Certificate 22BMF Declaration of Conformity Test Certificate 30BFA Test Certificate 30BFB Test Certificate 30BMA Test Certificate 30BUA Test Certificate 30BUB
Page 31 of 33
Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
Letter No 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001060 2015_22-SAG-EEHC-T-001060 2015_22-SAG-EEHC-T-001060 2015_22-SAG-EEHC-T-001060 2015_22-SAG-EEHC-T-001061 2015_22-SAG-EEHC-T-001061 2015_22-SAG-EEHC-T-001061 2015_22-SAG-EEHC-T-001061 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001063 2015_22-SAG-EEHC-T-001063 2015_22-SAG-EEHC-T-001063 2015_22-SAG-EEHC-T-001063 2015_22-SAG-EEHC-T-001063 2015_22-SAG-EEHC-T-001063 2015_22-SAG-EEHC-T-001064 2015_22-SAG-EEHC-T-001064 2015_22-SAG-EEHC-T-001064 2015_22-SAG-EEHC-T-001065 2015_22-SAG-EEHC-T-001065 2015_22-SAG-EEHC-T-001065 2015_22-SAG-EEHC-T-001066 2015_22-SAG-EEHC-T-001066 2015_22-SAG-EEHC-T-001066 2015_22-SAG-EEHC-T-001066 2015_22-SAG-EEHC-T-001066 2015_22-SAG-EEHC-T-001066 2015_22-SAG-EEHC-T-001067 2015_22-SAG-EEHC-T-001067 2015_22-SAG-EEHC-T-001067 2015_22-SAG-EEHC-T-001068 2015_22-SAG-EEHC-T-001068 2015_22-SAG-EEHC-T-001068 2015_22-SAG-EEHC-T-001069 2015_22-SAG-EEHC-T-001069 2015_22-SAG-EEHC-T-001069 2015_22-SAG-EEHC-T-001069 2015_22-SAG-EEHC-T-001069
Delivery Date 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
&EQC010 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC010 &EQC010 &EQC040 &EQC040 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC070 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040
EG1019-B-&EQC010-723172 EG1019-31BFF-&EQC040-723159 EG1019-31BMF-&EQC040-723160 EG1019-B-&EQC010-723172 EG1019-32BFF-&EQC040-723161 EG1019-32BMF-&EQC040-723162 EG1019-B-&EQC010-723172 EG1019-40BFA-&EQC040-723163 EG1019-40BFB-&EQC040-723164 EG1019-40BMA-&EQC040-723165 EG1019-40BUA-&EQC040-723166 EG1019-40BUB-&EQC040-723167 EG1019-B-&EQC010-723172 EG1019-41BFF-&EQC040-723168 EG1019-41BMF-&EQC040-723169 EG1019-B-&EQC010-723172 EG1019-B-&EQC010-723172 EG1019-42BFF-&EQC040-723170 EG1019-42BMF-&EQC040-723171 EG1019-11MPB20-&MQC040-629950 EG1019-11MPB20-&MQC040-629951 EG1019-11MPB20-&MQC070-629959 EG1019-11MPB20-&MDA010-713913 EG1019-11MPB20-&MDA010-713912 EG1019-11MPB20-&MQC040-713911 EG1019-11MPB20-&MQC040-713910 EG1019-12MPB20-&MQC040-629951 EG1019-12MPB20-&MQC040-629950 EG1019-12MPB20-&MQC070-629959 EG1019-21MPB20-&MQC040-629951 EG1019-21MPB20-&MQC040-629950 EG1019-21MPB20-&MQC070-629959 EG1019-21MPB20-&MDA010-713913 EG1019-21MPB20-&MDA010-713912 EG1019-21MPB20-&MQC040-713911 EG1019-21MPB20-&MQC040-713910 EG1019-22MPB20-&MQC040-629951 EG1019-22MPB20-&MQC040-629950 EG1019-22MPB20-&MQC070-629959 EG1019-22MPB20-&MDA010-713913 EG1019-22MPB20-&MDA010-713912 EG1019-22MPB20-&MQC040-713911 EG1019-22MPB20-&MQC040-713910 EG1019-31MPB20-&MQC040-629951 EG1019-31MPB20-&MQC040-629950 EG1019-31MPB20-&MQC070-629959 EG1019-31MPB20-&MDA010-713913 EG1019-31MPB20-&MDA010-713912 EG1019-31MPB20-&MQC040-713911
Originator: [ADM]
UNID 449335367 449335008 449335015 449335367 449335022 449335039 449335367 449335046 449335053 449335060 449335077 449335084 449335367 449335091 449335107 449335367 449335367 449335114 449335121 498160026 498160033 498160217 508479407 508479414 508479421 508479438 508380369 508380376 508380352 508380512 508380529 508380505 508479681 508479698 508479704 508479711 508380567 508380574 508380550 508479643 508479650 508479667 508479674 508380611 508380628 508380604 508479605 508479612 508479629
Rev. -
Document Title Declaration of Conformity Test Certificate 31BFF Test Certificate 31BMF Declaration of Conformity Test Certificate 32BFF Test Certificate 32BMF Declaration of Conformity Test Certificate 40BFA Test Certificate 40BFB Test Certificate 40BMA Test Certificate 40BUA Test Certificate 40BUB Declaration of Conformity Test Certificate 41BFF Test Certificate 41BMF Declaration of Conformity Declaration of Conformity Test Certificate 42BFF Test Certificate 42BMF Cover Sheet Table of Content List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice ARS METAL Table of Content Cover Sheet List of Materials with Lot Numbers Table of Content Cover Sheet List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice ARS METAL Table of Content Cover Sheet List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice ARS METAL Table of Content Cover Sheet List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice
Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
Page 32 of 33
Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
Letter No 2015_22-SAG-EEHC-T-001069 2015_22-SAG-EEHC-T-001070 2015_22-SAG-EEHC-T-001070 2015_22-SAG-EEHC-T-001070 2015_22-SAG-EEHC-T-001071 2015_22-SAG-EEHC-T-001071 2015_22-SAG-EEHC-T-001071 2015_22-SAG-EEHC-T-001072 2015_22-SAG-EEHC-T-001072 2015_22-SAG-EEHC-T-001072 2015_22-SAG-EEHC-T-001072 2015_22-SAG-EEHC-T-001072 2015_22-SAG-EEHC-T-001072 2015_22-SAG-EEHC-T-001073 2015_22-SAG-EEHC-T-001073 2015_22-SAG-EEHC-T-001073 2015_22-SAG-EEHC-T-001074 2015_22-SAG-EEHC-T-001074 2015_22-SAG-EEHC-T-001074 2015_22-SAG-EEHC-T-001075 2015_22-SAG-EEHC-T-001075 2015_22-SAG-EEHC-T-001075 2015_22-SAG-EEHC-T-001076 2015_22-SAG-EEHC-T-001076 2015_22-SAG-EEHC-T-001076 2015_22-SAG-EEHC-T-001076 2015_22-SAG-EEHC-T-001077 2015_22-SAG-EEHC-T-001077 2015_22-SAG-EEHC-T-001077 2015_22-SAG-EEHC-T-001079 2015_22-SAG-EEHC-T-001079 2015_22-SAG-EEHC-T-001079 2015_22-SAG-EEHC-T-001080 2015_22-SAG-EEHC-T-001080 2015_22-SAG-EEHC-T-001080 2015_22-SAG-EEHC-T-001080 2015_22-SAG-EEHC-T-001081 2015_22-SAG-EEHC-T-001081 2015_22-SAG-EEHC-T-001081 2015_22-SAG-EEHC-T-001082 2015_22-SAG-EEHC-T-001082 2015_22-SAG-EEHC-T-001082 2015_22-SAG-EEHC-T-001082 2015_22-SAG-EEHC-T-001083 2015_22-SAG-EEHC-T-001083 2015_22-SAG-EEHC-T-001083 2015_22-SAG-EEHC-T-001084 2015_22-SAG-EEHC-T-001084 2015_22-SAG-EEHC-T-001084
Delivery Date 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28
Date: 09.08.2017
x
List of Documents
x
EG1019
2017-08-09
x DCC
Drawing No
&MQC040 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040 &MQC040 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010
EG1019-31MPB20-&MQC040-713910 EG1019-32MPB20-&MQC040-629951 EG1019-32MPB20-&MQC040-629950 EG1019-32MPB20-&MQC070-629959 EG1019-32MPB20-&MDA010-713913 EG1019-32MPB20-&MDA010-713912 EG1019-32MPB20-&MQC040-713911 EG1019-32MPB20-&MQC040-713910 EG1019-41MPB20-&MQC040-629951 EG1019-41MPB20-&MQC040-629950 EG1019-41MPB20-&MQC070-629959 EG1019-41MPB20-&MDA010-713913 EG1019-41MPB20-&MDA010-713912 EG1019-41MPB20-&MQC040-713911 EG1019-41MPB20-&MQC040-713910 EG1019-42MPB20-&MQC040-629951 EG1019-42MPB20-&MQC040-629950 EG1019-42MPB20-&MQC070-629959 EG1019-42MPB20-&MDA010-713913 EG1019-42MPB20-&MDA010-713912 EG1019-42MPB20-&MQC040-713911 EG1019-42MPB20-&MQC040-713910 EG1019-LCA-&EDC010-810687 EG1019-C-&EDC010-810682 EG1019-LAB-&EDC010-810681 EG1019-LAB-&EDC010-810684 EG1019-LAB-&EDC010-810685 EG1019-LAE-&EDC010-810683 EG1019-LBA-&EDC010-810688 EG1019-C-&EDC010-810689 EG1019-LBA-&EDC010-810690 EG1019-LCA-&EDC010-810686
Originator: [ADM]
UNID 508479636 508380666 508380673 508380659 508479568 508479575 508479582 508479599 508380710 508380727 508380703 508479520 508479537 508479544 508479551 508380765 508380772 508380758 508479483 508479490 508479506 508479513 508517987 508517932 508517925 508517956 508517963 508517949 508517994 508518007 508518014 508517970
Rev. -
Document Title ARS METAL Table of Content Cover Sheet List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice ARS METAL Table of Content Cover Sheet List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice ARS METAL Table of Content Cover Sheet List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice ARS METAL Seiko_Meter run with orifice 14" 300lbs_O&M Manual Seiko_Meter run with orifice 4" 900lbs_O&M Manual Seiko_Meter run with orifice 4" 300lbs_O&M Manual Seiko_Meter run with orifice 6" 900lbs_O&M Manual Seiko_Meter run with orifice 10"_O&M Manual Seiko_Meter run with orifice 4" 2500lbs_O&M Manual Seiko_Meter run with nozzle ID 240_O&M Manual Seiko_ISA 1932 Nozzle 12"_O&M Manual Seiko_ISA 1932 Nozzle 16"_O&M Manual Seiko_Meter run with orifice 12" 300lbs_O&M Manual
Page 33 of 33
Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR
Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO
Letter No 2015_22-SAG-EEHC-T-001084 2015_22-SAG-EEHC-T-001085 2015_22-SAG-EEHC-T-001085 2015_22-SAG-EEHC-T-001085 2015_22-SAG-EEHC-T-001086 2015_22-SAG-EEHC-T-001086 2015_22-SAG-EEHC-T-001086 2015_22-SAG-EEHC-T-001086 2015_22-SAG-EEHC-T-001087 2015_22-SAG-EEHC-T-001087 2015_22-SAG-EEHC-T-001087 2015_22-SAG-EEHC-T-001088 2015_22-SAG-EEHC-T-001088 2015_22-SAG-EEHC-T-001088 2015_22-SAG-EEHC-T-001088 2015_22-SAG-EEHC-T-001089 2015_22-SAG-EEHC-T-001089 2015_22-SAG-EEHC-T-001089 2015_22-SAG-EEHC-T-001090 2015_22-SAG-EEHC-T-001090 2015_22-SAG-EEHC-T-001090 2015_22-SAG-EEHC-T-001090 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091
Delivery Date 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28
Date: 09.08.2017
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
A 5. Financial Report
Intern Siemens
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Burullus 4800 MW COMBINED CYCLE POWER PLANT Contract No.: CAIRO/N/BB/CONSORTIUM«SIEMENS-ORASCOM»/2015/No.22 Financial Report
Scope Summary SIEMENS Scope Summary Currency
Contract Price
% of Contract Price
Invoiced
Paid
% of Contract Price
Offshore
EUR
1.054.969.000,00
950.339.284,66
90,1%
937.154.457,93
88,8%
Onshore
EUR
158.031.000,00
111.280.057,18
70,4%
103.802.457,40
65,7%
Total
EUR
1.213.000.000,00
1.061.619.341,84
87,5%
1.040.956.915,33
85,8%
Difference of Invoiced and Paid
Summary
20.662.426,51
July 31, 2017
4800 MW Combined Cycle Power Plant Contract No.: BURULLUS / N / BB / Consortium Siemens-Orascom / 2015 / No. 22 Financial Report
SIEMENS
Activity
Milestone Activity
% to be invoiced
% to be paid
% accumulated
Advance Payment I
7,500%
7,500%
Advance Payment I
7,500%
7,500%
Advance Payment I
7,500%
7,500%
Advance Payment I
7,500%
7,500%
Advance Payment II
7,500%
15,000%
Advance Payment II
7,500%
15,000%
Advance Payment II
7,500%
15,000%
Advance Payment II
7,500%
15,000%
Payment Schedule Milestone
Invoice value to be paid
amount to be paid in EUR
amount in EUR to be paid in EGP
Invoice No.
July 31, 2017
Invoice Date
Payment Date EUR
Payment Date EGP
OFFSHORE Combined Cycle Units
26.374.224,98
26.374.224,98
0,00 771100_C3036_Advanced_OFS
24.08.2015
OFFSHORE Open Cycle Units
52.748.450,03
52.748.450,03
0,00 771100_C3036_Advanced_OFS
24.08.2015
ONSHORE Combined Cycle Units
3.950.775,00
3.298.500,00
652.275,00 7711_C3036_Adv_Ons
24.08.2015
ONSHORE Open Cycle Units
7.901.550,00
6.597.000,00
1.304.550,00 7711_C3036_Adv_Ons
24.08.2015
OFFSHORE Combined Cycle Units
26.374.224,98
26.374.224,98
0,00 771100_C-3036_Advanced2_OFS
31.08.2015
08.09.2015 28.12.2015
OFFSHORE Open Cycle Units
52.748.450,03
52.748.450,03
0,00 771100_C-3036_Advanced2_OFS
31.08.2015
08.09.2015 28.12.2015
3.950.775,00
3.298.500,00
31.08.2015
08.09.2015 28.12.2015
08.09.2015
31.08.2015
08.09.2015 28.12.2015
08.09.2015
ONSHORE Combined Cycle Units ONSHORE Open Cycle Units
7.901.550,00
6.597.000,00
652.275,00 7711_C-3036_Adv2_Ons 1.304.550,00 7711_C-3036_Adv2_Ons
31.08.2015 28.12.2015
31.08.2015 28.12.2015
n.a.
Amount paid in EUR
Amount in EUR paid in EGP
79.122.675,00
-
27.08.2015 9.895.500,00
1.956.825,00
27.08.2015
n.a.
79.122.675,00
9.895.500,00
-
1.956.825,00
4800 MW Combined Cycle Power Plant Contract No.: BURULLUS / N / BB / Consortium Siemens-Orascom / 2015 / No. 22 Financial Report
SIEMENS
July 31, 2017
SIEMENS OFFSHORE - EG1019 Burullus - Milestone Payment Schedule for Open Cycle Units
Activity
Milestone Activity
% to be invoiced
% to be paid % accumulated
Details of advance payment shown on separate overview
Payment Schedule Milestone
Amount to be invoiced
Proportional advance payment value
Invoice value to be paid
amount to be paid in EUR
amount in EUR to Invoice No. be paid in EGP
Invoice Date
Payment Date EUR
Payment Date EGP
Amount paid in Amount paid in EUR EGP
Offshore open Cycle Units
OC-OFF-1
Unit 42 - Placing sub Order for Gas Turbine, Generator
2,353%
2,000%
17,000%
Offshore open Cycle Units
16.548.947,05
2.482.342,06
14.066.604,99
14.066.604,99
-
771100_C-3036-OC-OFF-1
31.03.2016
01.08.2016
14.066.604,99
OC-OFF-2
Unit 41 - Placing sub Order for Gas Turbine, Generator
2,353%
2,000%
19,000%
Offshore open Cycle Units
16.548.947,05
2.482.342,06
14.066.604,99
14.066.604,99
-
771100_C-3036-OC-OFF-2
31.03.2016
01.08.2016
14.066.604,99
OC-OFF-3
Unit 32 - Placing sub Order for Gas Turbine, Generator
2,353%
2,000%
21,000%
Offshore open Cycle Units
16.548.947,05
2.482.342,06
14.066.604,99
14.066.604,99
-
771100_C-3036-OC-OFF-3
31.03.2016
01.08.2016
14.066.604,99
OC-OFF-4
Unit 31 - Placing sub Order for Gas Turbine, Generator
2,353%
2,000%
23,000%
Offshore open Cycle Units
16.548.947,05
2.482.342,06
14.066.604,99
14.066.604,99
-
771100_C-3036-OC-OFF-4
31.03.2016
01.08.2016
14.066.604,99
OC-OFF-5
Unit 22 - Placing sub Order for Gas Turbine, Generator
2,353%
2,000%
25,000%
Offshore open Cycle Units
16.548.947,05
2.482.342,06
14.066.604,99
14.066.604,99
-
771100_C-3036-OC-OFF-5
31.03.2016
01.08.2016
14.066.604,99
OC-OFF-6
Unit 21 - Placing sub Order for Gas Turbine, Generator
2,353%
2,000%
27,000%
Offshore open Cycle Units
16.548.947,05
2.482.342,06
14.066.604,99
14.066.604,99
-
771100_C-3036-OC-OFF-6
31.03.2016
01.08.2016
14.066.604,99
OC-OFF-7
Unit 12 - Placing sub Order for Gas Turbine, Generator
2,353%
2,000%
29,000%
Offshore open Cycle Units
16.548.947,05
2.482.342,06
14.066.604,99
14.066.604,99
-
771100_C-3036-OC-OFF-7
31.03.2016
01.08.2016
14.066.604,99
OC-OFF-8
Unit 11 - Placing sub Order for Gas Turbine, Generator
2,353%
2,000%
31,000%
Offshore open Cycle Units
16.548.947,05
2.482.342,06
14.066.604,99
14.066.604,99
-
771100_C-3036-OC-OFF-8
31.03.2016
01.08.2016
14.066.604,99
OC-OFF-9
Receipt of GT Casing in factory - Unit 42
3,529%
3,000%
34,000%
Offshore open Cycle Units
24.819.904,02
3.722.985,60
21.096.918,42
21.096.918,42
-
771100_C-3036-OC-OFF-9
31.03.2016
01.08.2016
21.096.918,42
OC-OFF-10
Receipt of GT Casing in factory - Unit 41
3,529%
3,000%
37,000%
Offshore open Cycle Units
24.819.904,02
3.722.985,60
21.096.918,42
21.096.918,42
-
771100_C-3036-OC-OFF-10
31.03.2016
01.08.2016
21.096.918,42
OC-OFF-11
Receipt of GT Casing in factory - Unit 32
3,529%
3,000%
40,000%
Offshore open Cycle Units
24.819.904,02
3.722.985,60
21.096.918,42
21.096.918,42
-
771100_C-3036-OC-OFF-11
31.03.2016
01.08.2016
21.096.918,42
OC-OFF-12
Receipt of GT Casing in factory - Unit 31
3,529%
3,000%
43,000%
Offshore open Cycle Units
24.819.904,02
3.722.985,60
21.096.918,42
21.096.918,42
-
771100_C-3036-OC-OFF-12
31.03.2016
01.08.2016
21.096.918,42
OC-OFF-13
Receipt of GT Casing in factory - Unit 22
3,529%
3,000%
46,000%
Offshore open Cycle Units
24.819.904,02
3.722.985,60
21.096.918,42
21.096.918,42
-
771100_C-3036-OC-OFF-13
29.09.2016
30.01.2017
21.096.918,42
OC-OFF-14
Receipt of GT Casing in factory - Unit 21
3,529%
3,000%
49,000%
Offshore open Cycle Units
24.819.904,02
3.722.985,60
21.096.918,42
21.096.918,42
-
771100_C-3036-OC-OFF-14
30.08.2016
29.09.2016
21.096.918,42
OC-OFF-15
Receipt of GT Casing in factory - Unit 12
3,529%
3,000%
52,000%
Offshore open Cycle Units
24.819.904,02
3.722.985,60
21.096.918,42
21.096.918,42
-
771100_C-3036-OC-OFF-15
12.12.2016
30.01.2017
21.096.918,42
OC-OFF-16
Receipt of GT Casing in factory - Unit 11
3,529%
3,000%
55,000%
Offshore open Cycle Units
24.819.904,02
3.722.985,60
21.096.918,42
21.096.918,42
-
771100_C-3036-OC-OFF-16
16.01.2017
27.02.2017
21.096.918,42
OC-OFF-17
FOB Gas Turbine Core Engine - Unit 42
2,500%
2,125%
57,125%
Offshore open Cycle Units
17.582.816,68
2.637.422,50
14.945.394,18
14.945.394,18
-
771100_C-3036-OC-OFF-17
24.05.2016
01.08.2016
14.945.394,18
OC-OFF-18
FOB Gas Turbine Core Engine - Unit 41
2,500%
2,125%
59,250%
Offshore open Cycle Units
17.582.816,68
2.637.422,50
14.945.394,18
14.945.394,18
-
771100_C-3036-OC-OFF-18
24.05.2016
01.08.2016
14.945.394,18
OC-OFF-19
FOB Gas Turbine Core Engine - Unit 32
2,500%
2,125%
61,375%
Offshore open Cycle Units
17.582.816,68
2.637.422,50
14.945.394,18
14.945.394,18
-
771100_C-3036-OC-OFF-19
24.05.2016
01.08.2016
14.945.394,18
OC-OFF-20
FOB Gas Turbine Core Engine - Unit 31
2,500%
2,125%
63,500%
Offshore open Cycle Units
17.582.816,68
2.637.422,50
14.945.394,18
14.945.394,18
-
771100_C-3036-OC-OFF-20
24.05.2016
01.08.2016
14.945.394,18
OC-OFF-21
FOB Gas Turbine Core Engine - Unit 22
2,500%
2,125%
65,625%
Offshore open Cycle Units
17.582.816,68
2.637.422,50
14.945.394,18
14.945.394,18
-
771100_C-3036-OC-OFF-21
20.10.2016
27.02.2017
14.945.394,18
OC-OFF-22
FOB Gas Turbine Core Engine - Unit 21
2,500%
2,125%
67,750%
Offshore open Cycle Units
17.582.816,68
2.637.422,50
14.945.394,18
14.945.394,18
-
771100_C-3036-OC-OFF-22
14.10.2016
27.02.2017
14.945.394,18
OC-OFF-23
FOB Gas Turbine Core Engine - Unit 12
2,500%
2,125%
69,875%
Offshore open Cycle Units
17.582.816,68
2.637.422,50
14.945.394,18
14.945.394,18
-
771100_C-3036-OC-OFF-23
24.01.2017
29.03.2017
14.945.394,18
OC-OFF-24
FOB Gas Turbine Core Engine - Unit 11
2,500%
2,125%
72,000%
Offshore open Cycle Units
17.582.816,68
2.637.422,50
14.945.394,18
14.945.394,18
-
771100_C-3036-OC-OFF-24
27.02.2017
26.07.2017
14.945.394,18
OC-OFF-25
Gas Turbine Core Engine on Site - Unit 42
1,618%
1,375%
73,375%
Offshore open Cycle Units
11.379.598,95
1.706.939,84
9.672.659,11
9.672.659,11
-
771100_C-3036-OC-OFF-25
24.05.2016
01.08.2016
9.672.659,11
OC-OFF-26
Gas Turbine Core Engine on Site - Unit 41
1,618%
1,375%
74,750%
Offshore open Cycle Units
11.379.598,95
1.706.939,84
9.672.659,11
9.672.659,11
-
771100_C-3036-OC-OFF-26
03.07.2016
01.08.2016
9.672.659,11
OC-OFF-27
Gas Turbine Core Engine on Site - Unit 32
1,618%
1,375%
76,125%
Offshore open Cycle Units
11.379.598,95
1.706.939,84
9.672.659,11
9.672.659,11
-
771100_C-3036-OC-OFF-27
03.07.2016
01.08.2016
9.672.659,11
OC-OFF-28
Gas Turbine Core Engine on Site - Unit 31
1,618%
1,375%
77,500%
Offshore open Cycle Units
11.379.598,95
1.706.939,84
9.672.659,11
9.672.659,11
-
771100_C-3036-OC-OFF-28
03.07.2016
01.08.2016
9.672.659,11
OC-OFF-29
Gas Turbine Core Engine onSite - Unit 22
1,618%
1,375%
78,875%
Offshore open Cycle Units
11.379.598,95
1.706.939,84
9.672.659,11
9.672.659,11
-
771100_C-3036-OC-OFF-29
07.11.2016
30.01.2017
9.672.659,11
OC-OFF-30
Gas Turbine Core Engine on Site - Unit 21
1,618%
1,375%
80,250%
Offshore open Cycle Units
11.379.598,95
1.706.939,84
9.672.659,11
9.672.659,11
-
771100_C-3036-OC-OFF-30
31.10.2016
30.01.2017
9.672.659,11
OC-OFF-31
Gas Turbine Core Engine on Site - Unit 12
1,618%
1,375%
81,625%
Offshore open Cycle Units
11.379.598,95
1.706.939,84
9.672.659,11
9.672.659,11
-
771100_C-3036-OC-OFF-31
10.02.2017
29.03.2017
9.672.659,11
OC-OFF-32
Gas Turbine Core Engine on Site - Unit 11
1,618%
1,375%
83,000%
Offshore open Cycle Units
11.379.598,95
1.706.939,84
9.672.659,11
9.672.659,11
-
771100_C-3036-OC-OFF-32
20.03.2017
27.04.2017
9.672.659,11
CCC-OC-OFF-1
First Ignition of Gas Turbine Unit 42
1,250%
1,063%
84,063%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
771100_C-3036-CCC-OC-OFF-1
29.12.2016
27.02.2017
7.472.697,09
CCC-OC-OFF-2
First Ignition of Gas Turbine Unit 41
1,250%
1,063%
85,125%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
771100_C-3036-CCC-OC-OFF-2
22.01.2017
29.03.2017
7.472.697,09
CCC-OC-OFF-3
First Ignition of Gas Turbine Unit 32
1,250%
1,063%
86,188%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
771100_C-3036-CCC-OC-OFF-3
12.01.2017
27.02.2017
7.472.697,09
CCC-OC-OFF-4
First Ignition of Gas Turbine Unit 31
1,250%
1,063%
87,250%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
771100_C-3036-CCC-OC-OFF-4
15.01.2017
27.02.2017
7.472.697,09
CCC-OC-OFF-5
First Ignition of Gas Turbine Unit 22
1,250%
1,063%
88,313%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
771100_C-3036-CCC-OC-OFF-5
30.05.2017
26.07.2017
7.472.697,09
CCC-OC-OFF-6
First Ignition of Gas Turbine Unit 21
1,250%
1,063%
89,375%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
771100_C-3036-CCC-OC-OFF-6
31.05.2017
26.07.2017
7.472.697,09
CCC-OC-OFF-7
First Ignition of Gas Turbine Unit 12 (no advanced OC operation)
1,250%
1,063%
90,438%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
CCC-OC-OFF-8
First Ignition of Gas Turbine Unit 11 (no advanced OC operation)
1,250%
1,063%
91,500%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
TOAC-OC-OFF-1
TOAC of Open Cycle Unit 42
1,250%
1,063%
92,563%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
771100_C-3036-TOAC-OC-OFF-1
22.05.2017
28.06.2017
7.472.697,09
TOAC-OC-OFF-2
TOAC of Open Cycle Unit 41
1,250%
1,063%
93,625%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
771100_C-3036-TOAC-OC-OFF-2
20.05.2017
28.06.2017
7.472.697,09
TOAC-OC-OFF-3
TOAC of Open Cycle Unit 32
1,250%
1,063%
94,688%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
771100_C-3036-TOAC-OC-OFF-3
02.05.2017
28.06.2017
7.472.697,09
TOAC-OC-OFF-4
TOAC of Open Cycle Unit 31
1,250%
1,063%
95,750%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
771100_C-3036-TOAC-OC-OFF-4
22.05.2017
28.06.2017
7.472.697,09
TOAC-OC-OFF-5
TOAC of Open Cycle Unit 22
1,250%
1,063%
96,813%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
TOAC-OC-OFF-6
TOAC of Open Cycle Unit 21
1,250%
1,063%
97,875%
Offshore open Cycle Units
8.791.408,34
1.318.711,25
7.472.697,09
7.472.697,09
-
TOAC-OC-OFF-7+8
TOAC of Unit 12+11 = ToAC of Combined Cycle Module 1
2,500%
2,125%
100,000%
Offshore open Cycle Units
17.582.816,68
2.637.422,50
14.945.394,18
14.945.394,18
-
4800 MW Combined Cycle Power Plant Contract No.: BURULLUS / N / BB / Consortium Siemens-Orascom / 2015 / No. 22 Financial Report
SIEMENS
July 31, 2017
SIEMENS ONSHORE - EG1019 Burullus - Milestone Payment Schedule for Open Cycle Units
Activity
Milestone Activity
% to be invoiced
% to be paid % accumulated Payment Schedule Milestone
Details of advance payment shown on separate overview
Invoice value to amount to be be paid paid in EUR
amount in EUR to Invoice No. be paid in EGP
Invoice Date
Payment Date Payment Date Amount paid in Amount paid in EUR EGP EUR EGP
Onshore open Cycle Units
OC-ON-1
Placing Gas Turbine Core Engine - Unit 42
3,529%
3,000%
18,000%
Onshore open Cycle Units
3.160.251,26
2.638.492,14
521.759,12 7711BS_C3036_OC-ON-1
03.07.2016
01.08.2016
29.07.2016
2.638.492,14
521.759,12
OC-ON-2
Placing Gas Turbine Core Engine - Unit 41
3,529%
3,000%
21,000%
Onshore open Cycle Units
3.160.251,26
2.638.492,14
521.759,12 7711BS_C3036_OC-ON-2
03.07.2016
01.08.2016
29.07.2016
2.638.492,14
521.759,12
OC-ON-3
Placing Gas Turbine Core Engine - Unit 32
3,529%
3,000%
24,000%
Onshore open Cycle Units
3.160.251,26
2.638.492,14
521.759,12 7711BS_C3036_OC-ON-3
28.07.2016
29.09.2016
29.09.2016
2.638.492,14
521.759,12
OC-ON-4
Placing Gas Turbine Core Engine - Unit 31
3,529%
3,000%
27,000%
Onshore open Cycle Units
3.160.251,26
2.638.492,14
521.759,12 7711BS_C3036_OC-ON-4
28.07.2016
29.09.2016
29.09.2016
2.638.492,14
521.759,12
OC-ON-5
Placing Gas Turbine Core Engine - Unit 22
3,529%
3,000%
30,000%
Onshore open Cycle Units
3.160.251,26
2.638.492,14
521.759,12 7711BS_C3036_OC-ON-5
22.11.2016
30.01.2017
30.01.2017
2.638.492,14
521.759,12
OC-ON-6
Placing Gas Turbine Core Engine - Unit 21
3,529%
3,000%
33,000%
Onshore open Cycle Units
3.160.251,26
2.638.492,14
521.759,12 7711BS_C3036_OC-ON-6
27.11.2016
30.01.2017
30.01.2017
2.638.492,14
521.759,12
OC-ON-7
Placing Gas Turbine Core Engine - Unit 12
3,529%
3,000%
36,000%
Onshore open Cycle Units
3.160.251,26
2.638.492,14
521.759,12 7711BS_C3036_OC-ON-7
30.03.2017
30.05.2017
OC-ON-8
Placing Gas Turbine Core Engine - Unit 11
3,529%
3,000%
39,000%
Onshore open Cycle Units
3.160.251,26
2.638.492,14
521.759,12 7711BS_C3036_OC-ON-8
14.04.2017
30.05.2017
OC-ON-9
Start Lube Oil Flushing GT - Unit 42
2,353%
2,000%
41,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70 7711BS_C3036_OC-ON-9
16.11.2016
30.01.2017
30.01.2017
1.759.243,98
347.888,70
OC-ON-10
Start Lube Oil Flushing GT - Unit 41
2,353%
2,000%
43,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70 7711BS_C3036_OC-ON-10
16.11.2016
30.01.2017
30.01.2017
1.759.243,98
347.888,70
OC-ON-11
Start Lube Oil Flushing GT - Unit 32
2,353%
2,000%
45,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70 7711BS_C3036_OC-ON-11
21.11.2016
30.01.2017
30.01.2017
1.759.243,98
347.888,70
OC-ON-12
Start Lube Oil Flushing GT - Unit 31
2,353%
2,000%
47,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70 7711BS_C3036_OC-ON-12
21.11.2016
30.01.2017
30.01.2017
1.759.243,98
347.888,70
OC-ON-13
Start Lube Oil Flushing GT - Unit 22
2,353%
2,000%
49,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70 7711BS_C3036_OC-ON-13
13.04.2017
28.06.2017
1.759.243,98
OC-ON-14
Start Lube Oil Flushing GT - Unit 21
2,353%
2,000%
51,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70 7711BS_C3036_OC-ON-14
16.04.2017
28.06.2017
1.759.243,98
OC-ON-15
Start Lube Oil Flushing GT - Unit 12
2,353%
2,000%
53,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70
OC-ON-16
Start Lube Oil Flushing GT - Unit 11
2,353%
2,000%
55,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70
OC-ON-17
Start Cold Commissioning GT - Unit 42
2,353%
2,000%
57,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70 7711BS_C3036_OC-ON-17
24.11.2016
30.01.2017
30.01.2017
1.759.243,98
347.888,70
OC-ON-18
Start Cold Commissioning GT - Unit 41
2,353%
2,000%
59,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70 7711BS_C3036_OC-ON-18
24.11.2016
30.01.2017
30.01.2017
1.759.243,98
347.888,70
OC-ON-19
Start Cold Commissioning GT - Unit 32
2,353%
2,000%
61,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70 7711BS_C3036_OC-ON-19
14.12.2016
30.01.2017
30.01.2017
1.759.243,98
347.888,70
OC-ON-20
Start Cold Commissioning GT - Unit 31
2,353%
2,000%
63,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70 7711BS_C3036_OC-ON-20
18.12.2016
30.01.2017
30.01.2017
1.759.243,98
347.888,70
OC-ON-21
Start Cold Commissioning GT - Unit 22
2,353%
2,000%
65,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70 7711BS_C3036_OC-ON-21
23.04.2017
28.06.2017
1.759.243,98
OC-ON-22
Start Cold Commissioning GT - Unit 21
2,353%
2,000%
67,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70 7711BS_C3036_OC-ON-22
30.04.2017
28.06.2017
1.759.243,98
OC-ON-23
Start Cold Commissioning GT - Unit 12
2,353%
2,000%
69,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70
OC-ON-24
Start Cold Commissioning GT - Unit 11
2,353%
2,000%
71,000%
Onshore open Cycle Units
2.107.132,68
1.759.243,98
347.888,70
OC-ON-25
Start Hot Commissioning GT - Unit 42
1,765%
1,500%
72,500%
Onshore open Cycle Units
1.580.573,38
1.319.619,90
260.953,48 7711BS_C3036_OC-ON-25
26.12.2016
27.02.2017
30.03.2017
1.319.619,90
260.953,48
OC-ON-26
Start Hot Commissioning GT - Unit 41
1,765%
1,500%
74,000%
Onshore open Cycle Units
1.580.573,38
1.319.619,90
260.953,48 7711BS_C3036_OC-ON-26
21.01.2017
29.03.2017
10.05.2017
1.319.619,90
260.953,48
OC-ON-27
Start Hot Commissioning GT - Unit 32
1,765%
1,500%
75,500%
Onshore open Cycle Units
1.580.573,38
1.319.619,90
260.953,48 7711BS_C3036_OC-ON-27
10.01.2017
27.02.2017
30.03.2017
1.319.619,90
260.953,48
OC-ON-28
Start Hot Commissioning GT - Unit 31
1,765%
1,500%
77,000%
Onshore open Cycle Units
1.580.573,38
1.319.619,90
260.953,48 7711BS_C3036_OC-ON-28
13.01.2017
27.02.2017
30.03.2017
1.319.619,90
260.953,48
OC-ON-29
Start Hot Commissioning GT - Unit 22
1,765%
1,500%
78,500%
Onshore open Cycle Units
1.580.573,38
1.319.619,90
260.953,48 7711BS_C3036_OC-ON-29
30.05.2017
26.07.2017
1.319.619,90
OC-ON-30
Start Hot Commissioning GT - Unit 21
1,765%
1,500%
80,000%
Onshore open Cycle Units
1.580.573,38
1.319.619,90
260.953,48 7711BS_C3036_OC-ON-30
31.05.2017
26.07.2017
1.319.619,90
OC-ON-31
Start Hot Commissioning GT - Unit 12
1,765%
1,500%
81,500%
Onshore open Cycle Units
1.580.573,38
1.319.619,90
260.953,48
OC-ON-32
Start Hot Commissioning GT - Unit 11
1,765%
1,500%
83,000%
Onshore open Cycle Units
1.580.573,38
1.319.619,90
260.953,48
CCC-OC-ON-1
First Ignition of Gas Turbine Unit 42
1,250%
1,063%
84,063%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25 7711BS_C3036_CCC-OC-ON-1
29.12.2016
27.02.2017
30.03.2017
934.575,00
184.811,25
CCC-OC-ON-2
First Ignition of Gas Turbine Unit 41
1,250%
1,063%
85,125%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25 7711BS_C3036_CCC-OC-ON-2
22.01.2017
29.03.2017
10.05.2017
934.575,00
184.811,25
CCC-OC-ON-3
First Ignition of Gas Turbine Unit 32
1,250%
1,063%
86,188%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25 7711BS_C3036_CCC-OC-ON-3
12.01.2017
27.02.2017
30.03.2017
934.575,00
184.811,25
CCC-OC-ON-4
First Ignition of Gas Turbine Unit 31
1,250%
1,063%
87,250%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25 7711BS_C3036_CCC-OC-ON-4
15.01.2017
27.02.2017
30.03.2017
934.575,00
184.811,25
CCC-OC-ON-5
First Ignition of Gas Turbine Unit 22
1,250%
1,063%
88,313%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25 7711BS_C3036_CCC-OC-ON-5
30.05.2017
26.07.2017
934.575,00
CCC-OC-ON-6
First Ignition of Gas Turbine Unit 21
1,250%
1,063%
89,375%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25 7711BS_C3036_CCC-OC-ON-6
31.05.2017
26.07.2017
934.575,00
CCC-OC-ON-7
First Ignition of Gas Turbine Unit 12 (no advanced OC operation)
1,250%
1,063%
90,438%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25
CCC-OC-ON-8
First Ignition of Gas Turbine Unit 11 (no advanced OC operation)
1,250%
1,063%
91,500%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25
TOAC-OC-ON-1
TOAC of Open Cycle Unit 42
1,250%
1,063%
92,563%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25 7711BS_C3036_TOAC-OC-ON-1
22.05.2017
28.06.2017
934.575,00
TOAC-OC-ON-2
TOAC of Open Cycle Unit 41
1,250%
1,063%
93,625%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25 7711BS_C3036_TOAC-OC-ON-2
20.05.2017
28.06.2017
934.575,00
TOAC-OC-ON-3
TOAC of Open Cycle Unit 32
1,250%
1,063%
94,688%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25 7711BS_C3036_TOAC-OC-ON-3
02.05.2017
28.06.2017
934.575,00
TOAC-OC-ON-4
TOAC of Open Cycle Unit 31
1,250%
1,063%
95,750%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25 7711BS_C3036_TOAC-OC-ON-4
22.05.2017
28.06.2017
934.575,00
TOAC-OC-ON-5
TOAC of Open Cycle Unit 22
1,250%
1,063%
96,813%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25
TOAC-OC-ON-6
TOAC of Open Cycle Unit 21
1,250%
1,063%
97,875%
Onshore open Cycle Units
1.119.386,25
934.575,00
184.811,25
2,500%
2,125%
100,000%
Onshore open Cycle Units
2.238.772,50
1.869.150,00
369.622,50
TOAC-OC-ON-7+8 TOAC of Unit 12+11 = ToAC of Combined Cycle Module 10
2.638.492,14 2.638.492,14
4800 MW Combined Cycle Power Plant Contract No.: BURULLUS / N / BB / Consortium Siemens-Orascom / 2015 / No. 22 Financial Report
SIEMENS
July 31, 2017
SIEMENS OFFSHORE - EG1019 Burullus - Milestone Payment Schedule for Combined Cycle Units
Activity
Milestone Activity
% to be invoiced
% to be paid
% accumulated
Details of advance payment shown on separate overview
Payment Schedule Milestone
Invoice value to be paid
amount to be paid in EUR
amount in EUR to be paid in EGP
Invoice No.
Invoice Date
Payment Date EUR
Payment Date EGP
Amount paid in EUR
Offshore combined Cycle Units
CC-OFF-1
Placing Sub Order Steam turbine - Unit 10
2,353%
2,000%
17,000%
Offshore combined Cycle Units
7.033.302,49
7.033.302,49
-
771100_C-3036-CC-OFF-1
31.03.2016
01.08.2016
7.033.302,49
CC-OFF-2
Placing Sub Order Steam turbine - Unit 20
2,353%
2,000%
19,000%
Offshore combined Cycle Units
7.033.302,49
7.033.302,49
-
771100_C-3036-CC-OFF-2
31.03.2016
01.08.2016
7.033.302,49
CC-OFF-3
Placing Sub Order Steam turbine - Unit 30
2,353%
2,000%
21,000%
Offshore combined Cycle Units
7.033.302,49
7.033.302,49
-
771100_C-3036-CC-OFF-3
31.03.2016
01.08.2016
7.033.302,49
CC-OFF-4
Placing Sub Order Steam turbine - Unit 40
2,353%
2,000%
23,000%
Offshore combined Cycle Units
7.033.302,49
7.033.302,49
-
771100_C-3036-CC-OFF-4
31.03.2016
01.08.2016
7.033.302,49
CC-OFF-5
Placing Sub Order HRSG Unit 11 & Unit 12
2,353%
2,000%
25,000%
Offshore combined Cycle Units
7.033.302,49
7.033.302,49
-
771100_C-3036-CC-OFF-5
31.03.2016
01.08.2016
7.033.302,49
CC-OFF-6
Placing Sub Order HRSG Unit 21 & Unit 22
2,353%
2,000%
27,000%
Offshore combined Cycle Units
7.033.302,49
7.033.302,49
-
771100_C-3036-CC-OFF-6
31.03.2016
01.08.2016
7.033.302,49
CC-OFF-7
Placing Sub Order HRSG Unit 31 & Unit 32
2,353%
2,000%
29,000%
Offshore combined Cycle Units
7.033.302,49
7.033.302,49
-
771100_C-3036-CC-OFF-7
31.03.2016
01.08.2016
7.033.302,49
CC-OFF-8
Placing Sub Order HRSG Unit 41 & Unit 42
2,353%
2,000%
31,000%
Offshore combined Cycle Units
7.033.302,49
7.033.302,49
-
771100_C-3036-CC-OFF-8
31.03.2016
01.08.2016
7.033.302,49
CC-OFF-9
Receipt of ST Generator Casing in factory - Unit 10
3,529%
3,000%
34,000%
Offshore combined Cycle Units
10.548.459,19
10.548.459,19
-
771100_C-3036-CC-OFF-9
29.09.2016
30.01.2017
10.548.459,19
CC-OFF-10
Receipt of ST Forging & Casing in factory - Unit 10
3,529%
3,000%
37,000%
Offshore combined Cycle Units
10.548.459,19
10.548.459,19
-
771100_C-3036-CC-OFF-10
24.05.2016
01.08.2016
10.548.459,19
CC-OFF-11
Receipt of ST Generator Casing in factory - Unit 20
3,529%
3,000%
40,000%
Offshore combined Cycle Units
10.548.459,19
10.548.459,19
-
771100_C-3036-CC-OFF-11
30.08.2016
29.09.2016
10.548.459,19
CC-OFF-12
Receipt of ST Forging & Casing in factory - Unit 20
3,529%
3,000%
43,000%
Offshore combined Cycle Units
10.548.459,19
10.548.459,19
-
771100_C-3036-CC-OFF-12
28.07.2016
29.09.2016
10.548.459,19
CC-OFF-13
Receipt of ST Generator Casing in factory - Unit 30
3,529%
3,000%
46,000%
Offshore combined Cycle Units
10.548.459,19
10.548.459,19
-
771100_C-3036-CC-OFF-13
01.12.2016
30.01.2017
10.548.459,19
CC-OFF-14
Receipt of ST Forging & Casing in factory - Unit 30
3,529%
3,000%
49,000%
Offshore combined Cycle Units
10.548.459,19
10.548.459,19
-
771100_C-3036-CC-OFF-14
30.08.2016
29.09.2016
10.548.459,19
CC-OFF-15
Receipt of ST Generator Casing in factory - Unit 40
3,529%
3,000%
52,000%
Offshore combined Cycle Units
10.548.459,19
10.548.459,19
-
771100_C-3036-CC-OFF-15
13.01.2017
27.02.2017
10.548.459,19
CC-OFF-16
Receipt of ST Forging & Casing in factory - Unit 40
3,529%
3,000%
55,000%
Offshore combined Cycle Units
10.548.459,19
10.548.459,19
-
771100_C-3036-CC-OFF-16
16.11.2016
30.01.2017
10.548.459,19
CC-OFF-17
FOB Shipment of HRSG Modules - Unit 11
1,324%
1,125%
56,125%
Offshore combined Cycle Units
3.957.540,37
3.957.540,37
-
771100_C-3036-CC-OFF-17
29.09.2016
30.01.2017
3.957.540,37
CC-OFF-18
FOB Shipment of HRSG Modules - Unit 12
1,324%
1,125%
57,250%
Offshore combined Cycle Units
3.957.540,37
3.957.540,37
-
771100_C-3036-CC-OFF-18
01.11.2016
30.01.2017
3.957.540,37
CC-OFF-19
FOB Shipment of HRSG Modules - Unit 21
1,324%
1,125%
58,375%
Offshore combined Cycle Units
3.957.540,37
3.957.540,37
-
771100_C-3036-CC-OFF-19
04.10.2016
30.01.2017
3.957.540,37
CC-OFF-20
FOB Shipment of HRSG Modules - Unit 22
1,324%
1,125%
59,500%
Offshore combined Cycle Units
3.957.540,37
3.957.540,37
-
771100_C-3036-CC-OFF-20
08.12.2016
30.01.2017
3.957.540,37
CC-OFF-21
FOB Shipment of HRSG Modules - Unit 31
1,324%
1,125%
60,625%
Offshore combined Cycle Units
3.957.540,37
3.957.540,37
-
771100_C-3036-CC-OFF-21
04.01.2017
27.02.2017
3.957.540,37
CC-OFF-22
FOB Shipment of HRSG Modules - Unit 32
1,324%
1,125%
61,750%
Offshore combined Cycle Units
3.957.540,37
3.957.540,37
-
771100_C-3036-CC-OFF-22
23.01.2017
27.04.2017
3.957.540,37
CC-OFF-23
FOB Shipment of HRSG Modules - Unit 41
1,324%
1,125%
62,875%
Offshore combined Cycle Units
3.957.540,37
3.957.540,37
-
771100_C-3036-CC-OFF-23
04.03.2017
30.05.2017
3.957.540,37
CC-OFF-24
FOB Shipment of HRSG Modules - Unit 42
1,324%
1,125%
64,000%
Offshore combined Cycle Units
3.957.540,37
3.957.540,37
-
771100_C-3036-CC-OFF-24
31.03.2017
28.06.2017
3.957.540,37
CC-OFF-25
FOB Shipment Steam Turbine Core Engine (HP,IP,LP) - Unit 10
1,176%
1,000%
65,000%
Offshore combined Cycle Units
3.515.156,71
3.515.156,71
-
771100_C-3036-CC-OFF-25
06.01.2017
28.06.2017
3.515.156,71
CC-OFF-26
FOB Shipment Steam Turbine Core Engine (HP,IP,LP) - Unit 20
1,176%
1,000%
66,000%
Offshore combined Cycle Units
3.515.156,71
3.515.156,71
-
771100_C-3036-CC-OFF-26
13.02.2017
28.06.2017
3.515.156,71
CC-OFF-27
FOB Shipment Steam Turbine Core Engine (HP,IP,LP) - Unit 30
1,176%
1,000%
67,000%
Offshore combined Cycle Units
3.515.156,71
3.515.156,71
-
771100_C-3036-CC-OFF-27
20.04.2017
28.06.2017
3.515.156,71
CC-OFF-28
FOB Shipment Steam Turbine Core Engine (HP,IP,LP) - Unit 40
1,176%
1,000%
68,000%
Offshore combined Cycle Units
3.515.156,71
3.515.156,71
-
771100_C-3036-CC-OFF-28
26.05.2017
CC-OFF-29
Receipt on Site of HRSG Modules - Unit 11
1,176%
1,000%
69,000%
Offshore combined Cycle Units
3.515.156,71
3.515.156,71
-
771100_C-3036-CC-OFF-29
19.11.2016
30.01.2017
3.515.156,71
CC-OFF-30
Receipt on Site of HRSG Modules - Unit 12
1,176%
1,000%
70,000%
Offshore combined Cycle Units
3.515.156,71
3.515.156,71
-
771100_C-3036-CC-OFF-30
21.12.2016
30.01.2017
3.515.156,71
CC-OFF-31
Receipt on Site of HRSG Modules - Unit 21
1,176%
1,000%
71,000%
Offshore combined Cycle Units
3.515.156,71
3.515.156,71
-
771100_C-3036-CC-OFF-31
12.12.2016
30.01.2017
3.515.156,71
CC-OFF-32
Receipt on Site of HRSG Modules - Unit 22
1,176%
1,000%
72,000%
Offshore combined Cycle Units
3.515.156,71
3.515.156,71
-
771100_C-3036-CC-OFF-32
13.02.2017
29.03.2017
3.515.156,71
CC-OFF-33
Receipt on Site of HRSG Modules - Unit 31
1,176%
1,000%
73,000%
Offshore combined Cycle Units
3.515.156,71
3.515.156,71
-
771100_C-3036-CC-OFF-33
18.03.2017
27.04.2017
3.515.156,71
CC-OFF-34
Receipt on Site of HRSG Modules - Unit 32
1,176%
1,000%
74,000%
Offshore combined Cycle Units
3.515.156,71
3.515.156,71
-
771100_C-3036-CC-OFF-34
22.03.2017
27.04.2017
3.515.156,71
CC-OFF-35
Receipt on Site of HRSG Modules - Unit 41
1,176%
1,000%
75,000%
Offshore combined Cycle Units
3.515.156,71
3.515.156,71
-
771100_C-3036-CC-OFF-35
08.05.2017
28.06.2017
3.515.156,71
CC-OFF-36
Receipt on Site of HRSG Modules - Unit 42
1,176%
1,000%
76,000%
Offshore combined Cycle Units
3.515.156,71
3.515.156,71
-
771100_C-3036-CC-OFF-36
18.05.2017
CC-OFF-37
Receipt on Site Steam Turbine Core Engine (HP,IP,LP) - Unit 10
2,059%
1,750%
77,750%
Offshore combined Cycle Units
6.154.513,31
6.154.513,31
-
771100_C-3036-CC-OFF-37
28.02.2017
29.03.2017
6.154.513,31
CC-OFF-38
Receipt on Site Steam Turbine Core Engine (HP,IP,LP) - Unit 20
2,059%
1,750%
79,500%
Offshore combined Cycle Units
6.154.513,31
6.154.513,31
-
771100_C-3036-CC-OFF-38
04.03.2017
27.04.2017
6.154.513,31
CC-OFF-39
Receipt on Site Steam Turbine Core Engine (HP,IP,LP) - Unit 30
2,059%
1,750%
81,250%
Offshore combined Cycle Units
6.154.513,31
6.154.513,31
-
771100_C-3036-CC-OFF-39
05.05.2017
28.06.2017
6.154.513,31
CC-OFF-40
Receipt on Site Steam Turbine Core Engine (HP,IP,LP) - Unit 40
2,059%
1,750%
83,000%
Offshore combined Cycle Units
6.154.513,31
6.154.513,31
-
771100_C-3036-CC-OFF-40
17.06.2017
CCC-CC-1
Steam Blow of Combined Module 10
2,500%
2,125%
85,125%
Offshore combined Cycle Units
7.472.697,08
7.472.697,08
-
CCC-CC-2
Steam Blow of Combined Module 20
2,500%
2,125%
87,250%
Offshore combined Cycle Units
7.472.697,08
7.472.697,08
-
CCC-CC-3
Steam Blow of Combined Module 30
2,500%
2,125%
89,375%
Offshore combined Cycle Units
7.472.697,08
7.472.697,08
-
CCC-CC-4
Steam Blow of Combined Module 40
2,500%
2,125%
91,500%
Offshore combined Cycle Units
7.472.697,08
7.472.697,08
-
TOAC-CC-1
TOAC of Combined Cycle Unit/Module 10
2,500%
2,125%
93,625%
Offshore combined Cycle Units
7.472.697,08
7.472.697,08
-
TOAC-CC-2
TOAC of Combined Cycle Unit 20
2,500%
2,125%
95,750%
Offshore combined Cycle Units
7.472.697,08
7.472.697,08
-
TOAC-CC-3
TOAC of Combined Cycle Unit 30
2,500%
2,125%
97,875%
Offshore combined Cycle Units
7.472.697,08
7.472.697,08
-
TOAC-CC-4
TOAC of Combined Cycle Unit 40
2,500%
2,125%
100,000%
Offshore combined Cycle Units
7.484.653,33
7.484.653,33
-
Amount paid in EGP
4800 MW Combined Cycle Power Plant Contract No.: BURULLUS / N / BB / Consortium Siemens-Orascom / 2015 / No. 22 Financial Report
SIEMENS
July 31, 2017
SIEMENS ONSHORE - EG1019 Burullus - Milestone Payment Schedule for Combined Cycle Units
Activity
Milestone Activity
% to be invoiced
% to be paid % accumulated
Details of advance payment shown on separate overview
Payment Schedule Milestone
Invoice value to be paid
amount to be paid in EUR
amount in EUR to Invoice No. be paid in EGP
Invoice Date
Payment Date EUR
Payment Date EGP
Amount paid in Amount paid in EUR EGP
Onshore combined Cycle Units
CC-ON-1
Receipt on Site of HRSG Modules - Unit 11
2,353%
2,000%
17,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35 771100_C-3036-CC-ON-1
19.11.2016
30.01.2017
30.01.2017
879.621,99
173.944,35
CC-ON-2
Receipt on Site of HRSG Modules - Unit 12
2,353%
2,000%
19,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35 771100_C-3036-CC-ON-2
21.12.2016
30.01.2017
30.01.2017
879.621,99
173.944,35
CC-ON-3
Receipt on Site of HRSG Modules - Unit 21
2,353%
2,000%
21,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35 771100_C-3036-CC-ON-3
12.12.2016
30.01.2017
30.01.2017
879.621,99
173.944,35
CC-ON-4
Receipt on Site of HRSG Modules - Unit 22
2,353%
2,000%
23,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35 771100_C-3036-CC-ON-4
13.02.2017
29.03.2017
10.05.2017
879.621,99
173.944,35
CC-ON-5
Receipt on Site of HRSG Modules - Unit 31
2,353%
2,000%
25,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35 771100_C-3036-CC-ON-5
18.03.2017
27.04.2017
10.05.2017
879.621,99
173.944,35
CC-ON-6
Receipt on Site of HRSG Modules - Unit 32
2,353%
2,000%
27,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35 771100_C-3036-CC-ON-6
22.03.2017
27.04.2017
10.05.2017
879.621,99
173.944,35
CC-ON-7
Receipt on Site of HRSG Modules - Unit 41
2,353%
2,000%
29,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35 771100_C-3036-CC-ON-7
08.05.2017
28.06.2017
879.621,99
CC-ON-8
Receipt on Site of HRSG Modules - Unit 42
2,353%
2,000%
31,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35 771100_C-3036-CC-ON-8
18.05.2017
CC-ON-9
Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 10
2,353%
2,000%
33,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35
CC-ON-10
Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 20
2,353%
2,000%
35,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35
CC-ON-11
Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 30
2,353%
2,000%
37,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35
CC-ON-12
Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 40
2,353%
2,000%
39,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35
CC-ON-13
Finalisation of erection HRSG Modules - Unit 11
2,353%
2,000%
41,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35 771100_C-3036-CC-ON-13
27.04.2017
28.06.2017
879.621,99
CC-ON-14
Finalisation of erection HRSG Modules - Unit 12
2,353%
2,000%
43,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35 771100_C-3036-CC-ON-14
15.05.2017
28.06.2017
879.621,99
CC-ON-15
Finalisation of erection HRSG Modules - Unit 21
2,353%
2,000%
45,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35 771100_C-3036-CC-ON-15
04.05.2017
28.06.2017
879.621,99
CC-ON-16
Finalisation of erection HRSG Modules - Unit 22
2,353%
2,000%
47,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35 771100_C-3036-CC-ON-16
04.07.2017
CC-ON-17
Finalisation of erection HRSG Modules - Unit 31
2,353%
2,000%
49,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35
CC-ON-18
Finalisation of erection HRSG Modules - Unit 32
2,353%
2,000%
51,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35
CC-ON-19
Finalisation of erection HRSG Modules - Unit 41
2,353%
2,000%
53,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35
CC-ON-20
Finalisation of erection HRSG Modules - Unit 42
2,353%
2,000%
55,000%
Onshore combined Cycle Units
1.053.566,34
879.621,99
173.944,35
CC-ON-21
Finalisation of Erection Steam Turbine Bearing Casings - Unit 10
2,059%
1,750%
56,750%
Onshore combined Cycle Units
921.926,52
769.715,97
152.210,55 771100_C-3036-CC-ON-21
23.04.2017
28.06.2017
769.715,97
CC-ON-22
Finalisation of Erection Steam Turbine Bearing Casings - Unit 20
2,059%
1,750%
58,500%
Onshore combined Cycle Units
921.926,52
769.715,97
152.210,55 771100_C-3036-CC-ON-22
30.04.2017
28.06.2017
769.715,97
CC-ON-23
Finalisation of Erection Steam Turbine Bearing Casings - Unit 30
2,059%
1,750%
60,250%
Onshore combined Cycle Units
921.926,52
769.715,97
152.210,55 771100_C-3036-CC-ON-23
06.05.2017
28.06.2017
769.715,97
CC-ON-24
Finalisation of Erection Steam Turbine Bearing Casings - Unit 40
2,059%
1,750%
62,000%
Onshore combined Cycle Units
921.926,52
769.715,97
152.210,55 771100_C-3036-CC-ON-24
19.05.2017
28.06.2017
769.715,97
CC-ON-25
Finalisation Erection N-Turbine Outer Casing - ST Unit 10
1,765%
1,500%
63,500%
Onshore combined Cycle Units
790.286,69
659.809,95
130.476,74
CC-ON-26
Finalisation Erection N-Turbine Outer Casing - ST Unit 20
1,765%
1,500%
65,000%
Onshore combined Cycle Units
790.286,69
659.809,95
130.476,74
CC-ON-27
Finalisation Erection N-Turbine Outer Casing - ST Unit 30
1,765%
1,500%
66,500%
Onshore combined Cycle Units
790.286,69
659.809,95
130.476,74
CC-ON-28
Finalisation Erection N-Turbine Outer Casing - ST Unit 40
1,765%
1,500%
68,000%
Onshore combined Cycle Units
790.286,69
659.809,95
130.476,74
CC-ON-29
Start Oil Flushing ST - Unit 10
1,176%
1,000%
69,000%
Onshore combined Cycle Units
526.559,29
439.624,08
86.935,21
CC-ON-30
Start Oil Flushing ST - Unit 20
1,176%
1,000%
70,000%
Onshore combined Cycle Units
526.559,29
439.624,08
86.935,21
CC-ON-31
Start Oil Flushing ST - Unit 30
1,176%
1,000%
71,000%
Onshore combined Cycle Units
526.559,29
439.624,08
86.935,21
CC-ON-32
Start Oil Flushing ST - Unit 40
1,176%
1,000%
72,000%
Onshore combined Cycle Units
526.559,29
439.624,08
86.935,21
CC-ON-33
Start Cold Commissioning ST - Unit 10
1,176%
1,000%
73,000%
Onshore combined Cycle Units
526.559,29
439.624,08
86.935,21
CC-ON-34
Start Cold Commissioning ST - Unit 20
1,176%
1,000%
74,000%
Onshore combined Cycle Units
526.559,29
439.624,08
86.935,21
CC-ON-35
Start Cold Commissioning ST - Unit 30
1,176%
1,000%
75,000%
Onshore combined Cycle Units
526.559,29
439.624,08
86.935,21
CC-ON-36
Start Cold Commissioning ST - Unit 40
1,176%
1,000%
76,000%
Onshore combined Cycle Units
526.559,29
439.624,08
86.935,21
CC-ON-37
First Turning Gear Steam Turbine - Unit 10
2,059%
1,750%
77,750%
Onshore combined Cycle Units
921.926,52
769.715,97
152.210,55
CC-ON-38
First Turning Gear Steam Turbine - Unit 20
2,059%
1,750%
79,500%
Onshore combined Cycle Units
921.926,52
769.715,97
152.210,55
CC-ON-39
First Turning Gear Steam Turbine - Unit 30
2,059%
1,750%
81,250%
Onshore combined Cycle Units
921.926,52
769.715,97
152.210,55
CC-ON-40
First Turning Gear Steam Turbine - Unit 40
2,059%
1,750%
83,000%
Onshore combined Cycle Units
921.926,52
769.715,97
152.210,55
CCC-CC-1
Steam Blow of Combined Module 10
2,500%
2,125%
85,125%
Onshore combined Cycle Units
1.119.386,25
934.575,00
184.811,25
CCC-CC-2
Steam Blow of Combined Module 20
2,500%
2,125%
87,250%
Onshore combined Cycle Units
1.119.386,25
934.575,00
184.811,25
CCC-CC-3
Steam Blow of Combined Module 30
2,500%
2,125%
89,375%
Onshore combined Cycle Units
1.119.386,25
934.575,00
184.811,25
CCC-CC-4
Steam Blow of Combined Module 40
2,500%
2,125%
91,500%
Onshore combined Cycle Units
1.119.386,25
934.575,00
184.811,25
TOAC-CC-1
TOAC of Combined Cycle Unit/Module 10
2,500%
2,125%
93,625%
Onshore combined Cycle Units
1.119.386,25
934.575,00
184.811,25
TOAC-CC-2
TOAC of Combined Cycle Unit 20
2,500%
2,125%
95,750%
Onshore combined Cycle Units
1.119.386,25
934.575,00
184.811,25
TOAC-CC-3
TOAC of Combined Cycle Unit 30
2,500%
2,125%
97,875%
Onshore combined Cycle Units
1.119.386,25
934.575,00
184.811,25
TOAC-CC-4
TOAC of Combined Cycle Unit 40
2,500%
2,125%
100,000%
Onshore combined Cycle Units
1.119.386,25
934.575,00
184.811,25
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
A 6.
Intern Siemens
Shipments Status
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Project:
Burullus
Shipment No. Mode of transportPackage quantity 3549 Sea 0 6128 Sea 2 5113 Air 2 9004 Truck 6 3571 Air 9 2940 Air 6 4918 Sea 2 5299 Sea 2
Gr. Wt. 0,00 8443,37 136,00 1920,00 1473,09 687,00 6600,00 51120,00
Schmidt, Thomas , Phone: +49 (69) 807-2253 , Mobile: +49 (173) 5153412 , Email: thomas.schmidt@siemens.com
Volume 0 7 0 13 3 3 43 123
5257 Sea
5
67680,00
482
5258 Sea
1
11770,00
96
5253 Sea
3
41983,00
289
5298 Sea
7
4701,68
29
5318 Sea
16
7714,00
28
5301 Sea
1
3822,07
4
5297 Sea
2
3758,00
9
5305 Sea
5
867,00
7
5200 Sea
15
18551,92
98
3604 Sea
1
35,65
0
2964 Sea
4
493,00
4
5313 Sea
12
19923,00
72
6112 Air 5330 Sea
1 2
431,00 26700,00
4 154
3613 Sea
7
5666,00
9
5306 Sea
6
4755,00
31
3614 Air
8
160,15
1
6118 Air
9
1377,45
7
Port of loading POI Port MOTN of import Flight No. ETD / Name Estimated of ATD Vessel Actual time oftime ETA departure of POD departure Estimated ATA POD (DELIVER: Actual time oftime arrival L320) of arrival at port at ofport destination ETAofSite destination ATA Estimated Site Actual (DELIVER:L330) arrival timeat ofsite arrival at site (DELIVER: FKT_TV_KKS L400) Rijeka Alexandria 2016-10-20 Hamburg ALEXANDRIA # 00 Amsterdam 11UHA Bremen 2016-11-18 2016-12-02 40PUR Mumbai 2016-12-16 2017-01-05 00URA Frankfurt CAIRO MS1520/20 2017-01-16 2017-01-28 20MA Hamburg 2017-03-05 2017-03-12 11C ; 12C Busan ALEXANDRIA GUDRUN 2017-06-26 2017-06-24 2017-07-26 2017-08-05 40PAC MAERSK #961109598 Hamburg ALEXANDRIA MSC ATHENS 2017-06-28 2017-06-29 2017-07-18 2017-07-18 2017-07-28 40UBA #MSCURU915 287 Hamburg ALEXANDRIA MSC ATHENS 2017-06-28 2017-06-29 2017-07-18 2017-07-18 2017-07-28 40UBA #MSCURU912 698 Hamburg ALEXANDRIA MSC ATHENS 2017-06-28 2017-06-29 2017-07-18 2017-07-18 2017-07-28 40UBA; 41UBA; 42UBA #MSCURU899 242 Hamburg ALEXANDRIA MSC EDITH 2017-07-05 2017-07-04 2017-07-22 2017-07-23 2017-08-01 00 #MSCUOJ0933 08 Hamburg ALEXANDRIA RIO BLANCO 2017-07-05 2017-07-06 2017-07-15 2017-07-17 2017-07-25 00 #SGL572501 Hamburg ALEXANDRIA MSC EDITH 2017-07-05 2017-07-04 2017-07-22 2017-07-23 2017-08-01 00 #MSCUOJ0888 78 Hamburg ALEXANDRIA MSC EDITH 2017-07-05 2017-07-04 2017-07-22 2017-07-23 2017-08-01 40PGB #MSCUOJ0823 68 Shanghai ALEXANDRIA MSC 2017-07-06 2017-07-07 2017-08-03 2017-08-13 00 MELATILDE #MSCUKN203 563 Rijeka ALEXANDRIA HANSA 2017-07-11 2017-07-12 2017-07-30 2017-08-09 40BAT CLOPPENBURG # Rijeka ALEXANDRIA HANSA 2017-07-11 2017-07-12 2017-07-30 2017-08-09 40BAT CLOPPENBURG # Hamburg ALEXANDRIA MSC 2017-07-14 2017-07-14 2017-07-29 2017-08-08 10MA CAROUGE #MSCUOJ1278 90 Hamburg ALEXANDRIA MSC 2017-07-14 2017-07-14 2017-07-29 2017-08-08 1X; 2X; 3X; 40C ; 41C ; 42C CAROUGE ; 4X #MSCUOJ1210 67 Viracopos 2017-07-15 2017-07-27 40URA Hamburg ALEXANDRIA MSC EDITH 2017-07-19 2017-07-19 2017-08-05 2017-08-15 30MA #MSCUOJ2100 19 Hamburg ALEXANDRIA MSC EDITH 2017-07-19 2017-07-19 2017-08-05 2017-08-15 00 #MSCUOJ1960 77 Hamburg ALEXANDRIA MSC EDITH 2017-07-19 2017-07-19 2017-08-05 2017-08-15 40C ; 40PAH; 40PDB #MSCUOJ1806 34 Düsseldorf CAIRO AF341/21 2017-07-21 2017-07-22 2017-07-27 00MA ; 00MK AF6752/22 #05752956595 Düsseldorf CAIRO MS1520 + 2017-07-22 2017-07-22 2017-07-23 2017-07-23 2017-07-28 00EKH; 10MA ; 11MPB; 22MB ; MS541 #07731MB ; 42MB 96595332
2965 Sea
7
62165,00
315 Antwerpen
ALEXANDRIA
5303 Sea
1
9983,00
41 Antwerpen
ALEXANDRIA
6123 Air
1
61,00
0 D端sseldorf
5333 Sea
2
37490,00
60 Antwerpen
ALEXANDRIA
5332 Sea
2
7140,00
85 Antwerpen
ALEXANDRIA
6120 Air
1
130,00
6119 Air 6115 Sea
4 6
430,23 3758,60
1 D端sseldorf 27 Hamburg
5315 Air
1
20,14
0 D端sseldorf
5331 Sea
3
6150,00
27 Hamburg
6125 6124 6126 6122 5336
Air Air Air Air Sea
2 5 1 6 8
135,67 13,36 30,90 8186,00 2886,96
1 0 0 17 22
5337 Sea 4000 Sea
1 14
3161,25 83620,00
5 Hamburg 263 Hamburg
ALEXANDRIA ALEXANDRIA
4001 Sea
2
1679,00
1 Hamburg
ALEXANDRIA
4008 Air
1
732,72
0 Frankfurt
CAIRO
4005 Air
2
10380,00
9 Frankfurt
CAIRO
4007 Air
10
41,30
0 Frankfurt
CAIRO
4002 Sea
10
63860,00
184 Hamburg
ALEXANDRIA
4003 Sea 4004 Sea
6 1
36720,00 10172,06
119 Hamburg 38 Hamburg
ALEXANDRIA ALEXANDRIA
4006 Sea
1
7750,00
5 Hamburg
ALEXANDRIA
4011 Sea
6
36450,00
72 Hamburg
ALEXANDRIA
4009 Air
5
1510,00
4012 Sea
3
23640,00
14 Hamburg
ALEXANDRIA
4010 Sea 3501 Sea
2 30
3433,00 31746,00
59 Jakarta 36 Hamburg
ALEXANDRIA Alexandria
2 Prag
Prag D端sseldorf Prag Shanghai Hamburg
6 Vantaa
CAIRO
CAIRO
ALEXANDRIA CAIRO
ALEXANDRIA
ALEXANDRIA
CAIRO
SERENAY 1 #TBN SERENAY 1 #TBN MS1520/25 MS541/26 #077965985343 SERENAY 1 #TBN SERENAY 1 #TBN EK140/25 EK927/27 #17651853863 TBA # MSC DESIREE #MSCUOJ2687 85 AF341/28 AF6452/29 #05752956606 MSC BRANKA #
TBA # MSC DESIREE # MSC RANIA # CAP JERVIS #SEJ330492 CAP JERVIS #SEJ330310 LH8290 #0205216503 5 LH8290 #0205216502 4 KL8350 #0742987361 6 CAP HARVEY #SEJ334466 Vessel CAP HARRIETT #SEJ338339 CAP HAMILTON #SEJ340767 CAP HAMILTON #SEJ341937 LH7411/LH829 0 #0204128632 4 CAP HARRISSON #SEJ343753 APL SALALAH M/V CAP HAMILTON
2017-07-25
2017-08-08
2017-08-18
00
2017-07-25
2017-08-08
2017-08-18
40PAH
2017-07-25
2017-07-26
2017-07-31
00
2017-07-25
2017-08-08
2017-08-18
40MA
2017-07-25
2017-08-08
2017-08-18
40QU
2017-07-25
2017-07-27
2017-08-01
11BAA
2017-07-26 2017-07-26
2017-08-12
2017-08-22
00; 00EKH; 11MB ; 11UBA 00
2017-07-28
2017-07-29
2017-08-03
00ABA
2017-07-28
2017-08-12
2017-08-22
40LAC
2017-07-29 2017-07-29 2017-07-29 2017-07-29 2017-08-02
2017-08-05 2017-08-05 2017-08-05 2017-08-29
12MB ; 31MB 11MB ; 21MBL; 40UBA 11MB 40URA 00; 10C ; 30C ; 40C
2017-08-19
2017-08-09 2015-12-09
2015-12-09
2017-08-26 2015-12-19
2015-12-19
2017-09-05
2015-12-09
2015-12-09
2015-12-19
2015-12-19
00 2016-01-04 30UMA; 32UMB; 40UMA; 42UMB 2016-01-04 42UMB
2016-01-12
2016-01-12
2016-01-13
2016-01-13
2016-01-16 42UHN
2016-01-12
2016-01-12
2016-01-13
2016-01-13
2016-01-16 42UHN
2016-01-12
2016-01-12
2016-01-15
2016-01-15
2016-01-20 00
2015-12-30
2015-12-30
2016-01-09
2016-01-09
2016-01-21 22UMB; 30UMA; 40UMA
2016-01-06 2016-01-06
2016-01-07 2016-01-06
2016-01-16 2016-01-16
2016-01-16 2016-01-16
2016-01-23 12UMB 2016-01-23 40UMA
2016-01-20
2016-01-20
2016-01-30
2016-01-31
2016-02-03 42UHA
2016-01-20
2016-01-20
2016-01-30
2016-01-30
2016-02-09
2016-02-04 10UMA; 20UMA
2016-01-22
2016-01-22
2016-01-26
2016-01-26
2016-01-31
2016-02-04 00ABA
2016-01-27
2016-01-27
2016-02-06
2016-02-08
2016-01-17 2016-02-24
2016-01-18 2016-02-24
2016-02-15 2016-03-05
2016-02-15
2016-02-11 12UHA; 22UHA; 32UHA 2016-02-25 2016-03-31
2016-02-18 10URA 2016-03-22 00ABA
4030 Air
1
650,00
2 Frankfurt
CAIRO
4035 Air
1
1710,18
1 Frankfurt
CAIRO
4016 Sea
94
124916,00
890 Hamburg
Alexandria
4017 Sea
139
205560,00
1358 Hamburg
Alexandria
4014 Sea
6
135800,00
928 HuangPu
ALEXANDRIA
4015 Sea
2
30112,00
159 HuangPu
ALEXANDRIA
3503 Sea
31
206,60
1 Hamburg
Alexandria
4018 Air
1
35,00
0 Frankfurt
CAIRO
4041 Air
1
450,00
3 Frankfurt
CAIRO
47
55223,20
389 Hamburg
4032 Sea
38 Hamburg
Alexandria
4020 Sea
6
4400,00
4033 Sea
16
139100,00
4019 Sea
153
135070,00
947 Hamburg
4013 Sea
6
4400,00
38 Hamburg
ALEXANDRIA
4036 Sea
43
53305,39
74 Hamburg
Alexandria
4037 Sea
15
15113,00
95 Hamburg
Alexandria
4031 Sea
2
3655,00
17 Hamburg
ALEXANDRIA
4040 Sea
1
6363,89
38 Hamburg
ALEXANDRIA
4034 Sea
2
12400,00
103 Antwerpen
ALEXANDRIA
4047 Sea
23
44007,00
431 Hamburg
ALEXANDRIA
3506 Sea 4022 Sea
7 31
75,40 255230,00
4025 Sea
35
76810,00
4021 Sea
13
9676,90
4023 Sea
14
66826,58
3505 Sea
2
10053,00
77 Hamburg
ALEXANDRIA
4039 Sea
6
25805,00
29 Hamburg
ALEXANDRIA
1738 Koper
0 Hamburg 4321 Hamriya Free Zone 301 Hamburg 70 Jebel Ali Port
ALEXANDRIA DAMIETTA Alexandria
CAP Hamilton DAMIETTA ALEXANDRIA DAMIETTA
323 Laem Chabang ALEXANDRIA
MS6041/01 MS541/02 #07792292104 LH8290/08 #02052165061 M/V CAP JERVIS M/V CAP HAMILTON FRANBO PROSPECT #FP1601HPAL X01 FRANBO PROSPECT #FP1601HPAL X02 M/V CAP HARVEY MS6041/20 MS541/21 #07792292012 LH8290/13 #02052165083 M/V CAP HARVEY CAP HARVEY #SGL006426 HOHE BANK #
2016-03-01
2016-03-01
2016-03-02
2016-03-04
2016-03-22 42UHA
2016-03-08
2016-03-08
2016-03-08
2016-03-08
2016-03-22 00BZK
2016-02-17
2016-02-17
2016-02-27
2016-02-27
2016-02-24
2016-02-24
2016-03-05
2016-02-23
2016-02-25
2016-03-20
2016-03-21
2016-03-26 41MBR; 42MBR
2016-02-23
2016-02-25
2016-03-20
2016-03-21
2016-03-26 41MBR; 42MBR
M/V CAP HARRISSON CAP HARRISON #SGL004852 M/V CAP HARRIETT M/C CAP HARRIETT CAP JERVIS #SGL010805 CAP JERVIS #SGL020181 ARIF AMCA #013 CAP HAMILTON CAP Hamilton BBC SCOTLAND #HAMDAM001 CAP JERVIS #SGL015496 MAERSK EUPHRATES #MAEU956039 885 PUSAN #MSCUWT805 493 MSC ANTIGUA #MSCURV578 324 CAP HARRISON #SGL032379
2016-03-02
2016-03-15
2016-03-06
2016-03-23 00ABA
2016-03-31
2016-03-23 00ABA
2016-04-15
2016-04-03 00ABA
2016-02-20
2016-02-20
2016-02-21
2016-02-22
2016-04-04 00
2016-03-13
2016-03-13
2016-03-14
2016-03-18
2016-04-04 00
2016-02-29
2016-03-31
2016-04-05 00ABA
2016-03-09
2016-03-10
2016-03-20
2016-03-20
2016-04-05 31MBR; 32MBR
2016-03-16
2016-03-16
2016-03-21
2016-03-21
2016-04-09 10UMA; 20UMA; 30UMA; 40UMA 2016-04-11 00ABA
2016-03-02
2016-03-12 2016-03-03
2016-03-12
2016-03-12
2016-03-22
2016-04-13 41MBR; 42MBR
2016-03-15
2016-04-15
2016-04-13 00ABA
2016-03-15
2016-04-15
2016-04-13 00ABA
2016-03-23
2016-03-23
2016-04-02
2016-04-02
2016-03-23
2016-03-23
2016-04-02
2016-04-02
2016-04-16 20UMA
2016-03-25
2016-03-25
2016-04-09
2016-04-09
2016-04-16 41MBR; 42MBR
2016-03-31
2016-04-15
2016-04-12
2016-04-16 42MBR
2016-04-16 00ABA
2016-03-31 2016-03-20
2016-03-20
2016-04-15 2016-03-31
2016-04-01
2016-04-16 00ABA 2016-04-18 42MBR
2016-03-23
2016-03-23
2016-04-02
2016-04-02
2016-04-18 42MBR
2016-03-21
2016-03-20
2016-03-30
2016-03-30
2016-04-19 42MBR
2016-03-15
2016-03-15
2016-04-18
2016-04-18
2016-04-24 42MBR
2016-03-23
2016-03-30
2016-04-14
2016-04-14
2016-04-25 20UMA
2016-04-06
2016-04-06
2016-04-16
2016-04-16
2016-04-25 41MK ; 42MKA
3504 Sea
6
78,00
0 Hamburg
ALEXANDRIA
4059 Sea
19
45740,00
185 Hamburg
ALEXANDRIA
4048 Sea
9
74640,00
883 Koper
ALEXANDRIA
4049 Sea
2
13278,00
159 Hamburg
ALEXANDRIA
9000 Air
9
1857,00
10 Frankfurt
4027 Sea
110
73326,79
4028 Sea
6
4029 Sea
CAIRO
333 Ho Chi Minh Port
ALEXANDRIA
135800,00
928 HuangPu
ALEXANDRIA
2
29982,00
159 HuangPu
ALEXANDRIA
4065 Air
13
6749,00
31 Warschau
CAIRO
3508 Air
13
121,20
0 Frankfurt
CAIRO
3509 Air
16
121,10
1 Frankfurt
CAIRO
4051 Sea
2
3655,00
17 Hamburg
ALEXANDRIA
4050 Sea
35
76810,00
301 Hamburg
ALEXANDRIA
4053 Sea
13
9676,90
4058 Sea
3
51100,00
149 Hamburg
ALEXANDRIA
4069 Sea
31
114413,83
189 Hamburg
ALEXANDRIA
4094 Sea 2908 Air
4 8
6399,00 3343,00
18 Hamburg 8 Frankfurt
ALEXANDRIA CAIRO
4043 Sea
108
53344,00
241 Hamburg
ALEXANDRIA
4052 Sea
31
255230,00
4321 Hamriyah
4068 Sea
49
60426,93
199 Jebel Ali Port
DAMIETTA
4024 Sea
2
33985,86
172 Ho Chi Minh
ALEXANDRIA
4122 Air 4129 Air
14 2
12257,00 52,00
61 Hamburg 0 Frankfurt
CAIRO CAIRO
2909 Air
7
3212,00
7 Frankfurt
CAIRO
70 Jebel Ali
DAMIETTA
DAMIETTA
CAP HARRISON #SGL035115 CAP HARRISSON GRANDE SPAGNA VOY #1001 CAP HARRISON #SGL035073 KL8350/21MP 8960 #0742987363 1 XUTRA BHUM #MSCUVH470 113 SMART TINA #ST1601HPAL X01 SMART TINA #ST1601HPAL X02 KU176/16.04. KU541/17.04. MS6053/19 MS541/20 #07792581123 LH8290/21 #02052165153 CAP HARVEY #SGL033356 CAP HARVEY #SGL032371 MAERSK GANGES #MAEU956246 274 MSC AGADIR #MSCURV605 051 MSC AGADIR #MSCUKG367 101 MSC AGADIR LH8290/28 #02052165201 CMA CGM MARCO POLO BBC ORION #HAMDAM001 MAERSK INDUS #MAEU956387 159 UNION DEMETER #UD1603HCM ALX02 H8290/26.04. MS6401 MS541 #07792581182 MS6041/04 / MS541/06 #07792858942
2016-04-06
2016-04-06
2016-04-08
2016-04-16
2016-04-16
2016-04-25 41MK ; 42MKA
2016-04-21
2016-04-25 00ABA
2016-04-04
2016-04-04
2016-04-14
2016-04-14
2016-04-06
2016-04-06
2016-04-16
2016-04-16
2016-01-23
2016-01-23
2016-01-23
2016-01-28
2016-04-27 00ABA
2016-03-13
2016-03-15
2016-04-18
2016-04-18
2016-04-27 42MBR
2016-03-18
2016-03-04
2016-04-24
2016-04-24
2016-04-28 31MBR; 32MBR
2016-03-18
2016-03-04
2016-04-24
2016-04-24
2016-04-07
2016-04-26 10UMA; 20UMA 2016-04-26
2016-05-04
2016-04-15
2016-04-26 41MBL; 42MBL
2016-04-28 31MBR; 32MBR 2016-05-04 00ABA
2016-04-20
2016-04-19
2016-04-20
2016-04-20
2016-04-25
2016-05-04 41MK
2016-04-20
2016-04-21
2016-04-21
2016-04-21
2016-04-26
2016-05-04 41MK
2016-04-13
2016-04-13
2016-04-23
2016-04-24
2016-05-08 41MBR
2016-04-13
2016-04-13
2016-04-23
2016-04-24
2016-05-09 41MBR
2016-04-11
2016-04-11
2016-04-23
2016-04-23
2016-04-20
2016-04-20
2016-05-07
2016-05-07
2016-05-16 00
2016-04-20
2016-04-20
2016-05-07
2016-05-07
2016-05-16 32MB ; 41MB ; 42MB
2016-04-20 2016-04-28
2016-04-20 2016-04-29
2016-05-07 2016-04-28
2016-05-07 2016-04-28
2016-05-16 00ABA 2016-05-16 00MB ; 42MB
2016-03-31
2016-04-29
2016-05-03
2016-05-11 41MBR
2016-05-17 00ABA
2016-04-20
2016-04-24
2016-05-05
2016-05-05
2016-05-17 41MBR
2016-04-25
2016-04-25
2016-05-04
2016-05-04
2016-05-17 41MBR
2016-03-31
2016-04-10
2016-05-02
2016-05-02
2016-05-18 42MBR
2016-04-26 2016-04-28
2016-04-28
2016-04-30 2016-04-29
2016-04-29
2016-05-18 00ABA 2016-05-18 00MB
2016-04-30
2016-05-06
2016-05-06
2016-05-06
2016-05-18 00MK ; 41MB
4093 Air 3515 Air
1 6
156,00 78,00
0 Shanghai 0 Frankfurt
4026 Sea
9
117860,00
2900 Sea
6
5,86
0 Blexen
BURULLUS
4066 Sea
1
456500,00
447 Blexen
BURULLUS
4063 Sea
9
106170,00
3522 Air
1
5,00
0 Frankfurt
CAIRO
4135 Air
7
14886,75
28 Frankfurt
CAIRO
4046 Sea
1
395210,00
2902 Sea
5
28291,01
43 Blexen
2905 Sea
6
5,86
0 Blexen
ALEXANDRIA
2907 Sea
4
28291,01
49 Blexen
ALEXANDRIA
4085 Sea
1
456009,00
444 Blexen
BURULLUS
4088 Air
8
19980,00
145 Incheon
CAIRO
4086 Sea 3507 Air
1 8
394000,00 39,54
240 Blexen 0 Frankfurt
BURULLUS CAIRO
2911 Air
1
28,00
0 Frankfurt
0 4057 Sea
0 87
0,00 72616,20
0 395 Hamburg
ALEXANDRIA
4097 Sea
12
120049,00
919 Hamburg
ALEXANDRIA
4126 Sea
1
4533,31
38 Hamburg
ALEXANDRIA
3514 Sea
10
5280,00
9 Hamburg
ALEXANDRIA
4084 Sea 4118 Sea
22 7
13460,00 139601,95
18 Hamburg 675 Hamburg
ALEXANDRIA ALEXANDRIA
1260 Ho Chi Minh Port
1195 Hamriya Free Zone
240 Charleston
CAIRO CAIRO ALEXANDRIA
ALEXANDRIA
BURULLUS BURULLUS
CAIRO
EK9873/24 LH087/27/LH8 290/28 #02052165190 UNION DEMETER #UD1603HCM ALX01 ROCHEFORT #ROCH-BLEBUR-1A ROCHEFORT #ROCH-BLEBUR-1A TRADE NAVIGATOR #JEBAL01 KL8350/06 /KL8910/09 #07429873686 MS540/06 /MS541/08 #07792858953 MUSKETIER #MUSK-CHABUR-1 ROCHEFORT #ROCH-BLEBUR-1A MITTELPLATE #MITT-BLEBUR-1B MITTELPLATE #MITT-BLEBUR-1C MITTELPLATE #MITT-BLEBUR-1B CV6353 + CV8501 MITTELPLATE LH7103A/09 / LH584/11 #02052165212 MS 541/13 #07792858931 MSC PINA #MSCURV631 180 MSC PINA #MSCUKG401 264 CAP HARRIETT #SEJJSGL139 866 MSC PINA #MSCUKG382 241 MSC PINA MSC PINA #MSCURV653 499
2016-05-04 2016-05-26
2016-04-24 2016-04-27
2016-04-24 2016-04-28
2016-04-24 2016-04-28
2016-05-18 00 2016-05-18 31MKA; 32MKA
2016-03-31
2016-04-10
2016-05-05
2016-05-05
2016-05-19 42MBR
2016-04-25
2016-04-25
2016-05-10
2016-05-12
2016-05-20 42MB
2016-04-25
2016-04-25
2016-05-10
2016-05-12
2016-05-20 42MB
2016-04-15
2016-04-25
2016-05-13
2016-05-12
2016-05-22 41MBR
2016-05-06
2016-05-06
2016-05-09
2016-05-09
2016-05-06
2016-05-06
2016-05-08
2016-05-08
2016-05-22 41MB ; 42C ; 42MB
2016-04-22
2016-04-25
2016-05-20
2016-05-20
2016-05-23 42MKA
2016-04-25
2016-04-25
2016-05-10
2016-05-12
2016-05-24 42MB
2016-04-30
2016-04-30
2016-05-14
2016-05-14
2016-04-30
2016-04-30
2016-05-14
2016-05-14
2016-05-24 41MB
2016-04-30
2016-04-30
2016-05-13
2016-05-14
2016-05-24 41MB
2016-05-11
2016-05-11
2016-05-17
2016-05-17
2016-04-30 2016-05-09
2016-04-30 2016-05-09
2016-05-14 2016-05-05
2016-05-14 2016-05-05
2016-05-29 41MK 2016-05-29 31MBR; 32MBR; 41MK
2016-05-13
2016-05-14
2016-05-15
2016-05-15
2016-05-29 11MB
2016-03-09 2016-04-20
2016-04-28
2016-03-28 2016-05-14
2016-05-14
2016-05-30 2016-05-30 31MKA; 32MK ; 41MK ; 42MK ; 42MKA
2016-04-27
2016-04-28
2016-05-14
2016-05-14
2016-05-31 41MPB; 42MPB
2016-05-04
2016-05-04
2016-05-14
2016-05-14
2016-05-24
2016-05-31 40UBA
2016-04-27
2016-04-28
2016-05-14
2016-05-14
2016-05-24
2016-06-01 00BTA; 41BTA; 42BTA
2016-04-27 2016-04-27
2016-04-28 2016-04-28
2016-05-14 2016-05-14
2016-05-15 2016-05-14
2016-05-24
2016-06-01 00BTA; 41BTA; 42BTA 2016-06-01 00UBA; 41UBA; 42UBA; 99UBA
2016-05-14
2016-05-24
2016-05-22
2016-05-22 42C
2016-05-24 41MB
2016-05-25 00
3516 Air
8
192,00
1 Charlotte
CAIRO
AF6731/19.05. AF6752/21.05.
2016-05-03
4170 Air
3
80,00
0 Frankfurt
CAIRO
2016-05-14
2016-05-20
2016-05-20
2016-05-20
2016-06-01 40MB
4082 Sea 4096 Sea
2 46
8200,00 128238,00
40 Hamburg 357 Hamburg
ALEXANDRIA ALEXANDRIA
2016-04-27 2016-04-27
2016-04-28 2016-04-28
2016-05-15 2016-05-14
2016-05-15 2016-05-14
2016-06-02 41MB ; 42MB 2016-06-02 41MPB; 42MPB
3512 Sea
5
2692,00
13 Hamburg
ALEXANDRIA
MS6051/ MS541 MSC PINA MSC PINA #MSCUKG390 210 CAP HAMILTON #SGL073811 CAP JERVIS #SGL063793 CAP HAMILTON #SGL119768 LH7105S LH8290 #02052165120 BBC FRANCE #FRAN-CHABUR-2 CFL PERFECT #004 CFL PERFECT #003 CFL PERFECT #005 CFL PERFECT #010 LH8290 #02052165374 MSC PINA #MSCUKG412 113 MSC FLAMINIA #MSCURV650 313 SCHILLIG SCHILLIG #SCHI-BLEBUR-1B SCHILLIG #SCHI-BLEBUR-2B SCHILLIG #SCHI-BLEBUR-1C SCHILLIG #SCHI-BLEBUR-2C SCHILLIG #SCHI-BLEBUR-1B CFL PERFECT #012 MSC UMA #MSCUUF079 703 MSC UMA #MSCUUF081 337 MSC ATHOS #MSCURV644 688
2016-05-04
2016-05-04
2016-05-14
2016-05-14
2016-06-02 32MB ; 42MB
2016-04-13
2016-05-04
2016-05-14
2016-05-14
2016-05-04
2016-05-04
2016-05-14
2016-05-15
2016-05-24
2016-06-04 31C ; 31MB ; 32MB ; 41C ; 41MB ; 42MB
2016-04-05
2016-04-05
2016-04-06
2016-07-06
2016-04-11
2016-06-05 00
2016-04-29
2016-04-29
2016-05-23
2016-05-23
2016-06-05 32MKA
2016-04-29
2016-05-13
2016-05-26
2016-05-26
2016-06-05 41MBV; 41MPR; 42MBV; 42MPR
2016-05-09
2016-05-13
2016-05-26
2016-05-26
2016-06-05 42MBL
2016-05-13
2016-05-13
2016-05-26
2016-05-25
2016-06-05 20UEN
2016-05-13
2016-05-13
2016-05-26
2016-05-26
2016-06-05 41MBL
2016-05-26
2016-05-26
2016-05-26
2016-05-26
2016-06-05 11MB
2016-04-27
2016-04-28
2016-05-14
2016-05-15
2016-04-30
2016-04-30
2016-05-14
2016-05-15
2016-06-06 00
2016-05-02 2016-05-02
2016-05-02 2016-05-02
2016-05-15 2016-05-15
2016-05-16 2016-05-16
2016-06-06 32MB 2016-06-06 31MB
2016-05-02
2016-05-02
2016-05-15
2016-05-16
2016-06-06 32MB
2016-05-02
2016-05-02
2016-05-15
2016-05-16
2016-06-06 31MB
2016-05-02
2016-05-02
2016-05-15
2016-05-16
2016-06-06 32MB
2016-05-02
2016-05-02
2016-05-15
2016-05-16
2016-06-06 31MB
2016-05-13
2016-05-13
2016-05-26
2016-05-26
2016-06-06 41MB ; 42MB
2016-05-01
2016-05-04
2016-05-21
2016-05-21
2016-06-07 00ABA
2016-05-04
2016-05-05
2016-05-21
2016-05-21
2016-06-07 00ABA
2016-05-04
2016-05-04
2016-05-21
2016-05-21
2016-06-07 00BZK; 11MB ; 12MB ; 21MB ; 22MB ; 31MB ; 31MBA; 32MB ; 32MBA; 41MB ; 41MBA; 42MB ; 42MBA
4073 Sea
8
7780,00
34 Hamburg
ALEXANDRIA
4089 Sea
77
41632,34
145 Hamburg
ALEXANDRIA
6000 Air
1
5,10
4070 Sea
1
395210,00
240 Charleston
4106 Sea
22
133960,00
1422 Antwerpen
ALEXANDRIA
4077 Sea
1
7575,00
58 Antwerpen
ALEXANDRIA
4128 Sea
4
25985,00
160 Antwerpen
ALEXANDRIA
4125 Sea
1
7575,00
58 Antwerpen
ALEXANDRIA
3523 Air
4
25,00
0 Frankfurt
4092 Sea
12
11838,63
53 Hamburg
ALEXANDRIA
4079 Sea
7
95950,00
310 Antwerpen
ALEXANDRIA
4080 Sea 4067 Sea
1 1
456000,00 456500,00
447 Blexen 441 Blexen
BURULLUS BURULLUS
2906 Sea
6
5,86
0 Blexen
BURULLUS
2903 Sea
9
29567,21
44 Blexen
BURULLUS
2904 Sea
9
31075,21
44 Blexen
BURULLUS
2901 Sea
6
5,86
0 Blexen
BURULLUS
4083 Sea
8
46200,00
358 Antwerpen
ALEXANDRIA
4119 Sea
23
11771,55
27 Le Havre
ALEXANDRIA
3519 Sea
6
3559,50
6 Le Havre
ALEXANDRIA
4078 Sea
33
61949,18
458 Hamburg
ALEXANDRIA
0 Duesseldorf
CAIRO BURULLUS
CAIRO
2016-05-21
2016-06-01 31MKA; 32MKA
2016-06-04 31MB ; 32MB ; 41MB ; 42MB
2016-05-24
2016-06-06 00; 41MK
4038 Sea
1
572,00
2 Charleston
4104 Sea
2
55800,00
356 Antwerpen
ALEXANDRIA
4100 Sea
1
24000,00
101 Antwerpen
ALEXANDRIA
4101 Sea
8
46200,00
358 Hamburg
ALEXANDRIA
4062 Sea
2
35830,48
288 Antwerpen
ALEXANDRIA
4112 Sea
49
60409,39
199 Jebel Ali Port
DAMIETTA
4110 Sea
13
9676,90
70 Jebel Ali Port
DAMIETTA
2910 Air
2
626,00
4105 Sea
2
46500,00
173 Antwerpen
ALEXANDRIA
4095 Sea 4107 Sea
1 2
395210,06 35118,00
240 Charleston 193 Hamburg
BURULLUS ALEXANDRIA
4087 Sea 4056 Sea
7 2
106202,50 34086,00
675 Hamburg 333 Antwerpen
ALEXANDRIA ALEXANDRIA
4108 Sea
4
4400,00
31 Hamburg
ALEXANDRIA
4102 Sea
4
27350,00
118 Hamburg
ALEXANDRIA
3525 Air
1
4,00
0 Frankfurt
CAIRO
4186 Air
8
11238,68
65 Frankfurt
CAIRO
4103 Sea
38
38295,00
67 Hamburg
ALEXANDRIA
4138 Sea
7
33045,00
152 Hamburg
ALEXANDRIA
4127 Sea
44
126544,00
909 Hamburg
4064 Sea
2
370000,00
312 Constanta
4148 Sea
6
17855,00
55 Hamburg
ALEXANDRIA
4137 Sea
46
128238,00
357 Hamburg
ALEXANDRIA
4042 Sea
25
93149,00
141 HuangPu
ALEXANDRIA
4044 Sea
7
54781,00
782 Shanghai
ALEXANDRIA
5 Frankfurt
DAMIETTA
OOCL KAOHSIUNG #HLCUHOU16 0408679 CFL PERFECT #011 CFL PERFECT #006 MSC ATHOS #MSCURV677 324 CFL PERFECT #009 MAERSK EUPHRATES #956542404 MAERSK EUPHRATES #956529621 MS6051/18 / MS541/20 #07792858920 CFL PERFECT #008 BBC FRANCE MSC ATHOS #MSCUKG426 759 MSC ATHOS CFL PERFECT #001 MSC ATHOS #MSCUKG417 203 MSC LUCIANA #MSCUKG417 625 KL8350 KL553 #074-2987 3723 KL8354 MP8940 #07429873745 MSC LUCIANA #MSCURV664 249 MSC ARBATAX #MSCUKG444 074
2016-04-09
2016-04-08
2016-04-23
2016-04-23
2016-04-27
2016-05-13
2016-05-26
2016-05-26
2016-06-08 41MB ; 42MB
2016-04-27
2016-05-13
2016-05-26
2016-05-26
2016-06-08 00EKH
2016-05-04
2016-05-04
2016-05-21
2016-05-21
2016-06-08 31MB ; 32MB
2016-05-13
2016-05-13
2016-05-26
2016-05-26
2016-06-08 41MB ; 42MB
2016-05-13
2016-05-16
2016-05-25
2016-05-25
2016-05-13
2016-05-16
2016-05-25
2016-05-25
2016-06-08 32MBR
2016-05-18
2016-06-18
2016-05-20
2016-05-20
2016-06-08 11MB ; 40MB
2016-04-27
2016-05-13
2016-05-26
2016-05-26
2016-06-09 20UEN
2016-04-30 2016-05-04
2016-04-29 2016-05-16
2016-05-21 2016-05-21
2016-05-23 2016-05-21
2016-06-09 31MKA 2016-06-09 41UBA; 42UBA
2016-05-05 2016-05-13
2016-05-04 2016-05-13
2016-05-21 2016-05-26
2016-05-21 2016-05-25
2016-06-09 00UBA; 41UBA; 42UBA 2016-06-09 31MBR; 32MBR
2016-05-13
2016-05-04
2016-05-21
2016-05-21
2016-06-09 31MBA; 32MBA; 41MBA; 42MBA
2016-04-27
2016-05-12
2016-05-28
2016-05-28
2016-05-26
2016-05-26
2016-06-05
2016-06-05
2016-06-10 00BZK
2016-05-31
2016-05-31
2016-06-02
2016-06-02
2016-06-10 42MKA
2016-04-29
2016-05-12
2016-05-28
2016-05-28
2016-06-11 31MKA; 32MKA
2016-05-11
2016-05-12
2016-05-29
2016-05-29
2016-06-08
2016-06-11 00EKH; 20UEN; 41C ; 42C
ALEXANDRIA
MSC ARBATAX #MSCURV681 425
2016-05-11
2016-05-12
2016-05-28
2016-05-28
2016-06-07
2016-06-11 31MB ; 32MB ; 41MBV; 41MPR; 42MBV; 42MPR
BURULLUS
CIMBRIS #CIMB-CONBUR-1 RIO DE LA PLATA #SGL169281 MSC LUCIANA #MSCURV681 573 AMBER BEVERLY # AMBER BEVERLY #AB1601SHAL X01
2016-05-30
2016-05-27
2016-06-01
2016-06-01
2016-06-11
2016-06-11 41BAT; 42BAT
2016-06-01
2016-05-18
2016-05-28
2016-05-28
2016-05-01
2016-05-12
2016-05-28
2016-05-28
2016-03-31
2016-04-22
2016-06-05
2016-06-05
2016-06-13 42BBT; 42BFT
2016-03-31
2016-04-22
2016-06-05
2016-06-05
2016-06-13 41MBL
CAIRO
2016-05-03
2016-06-04
2016-05-22
2016-06-08 42MKA
2016-06-08 32MBR
2016-06-10 32MBJ; 42MBJ
2016-06-11 31BFT; 32BFT; 42BJT 2016-06-07
2016-06-12 31MPB; 32MPB
4045 Sea
7
54781,00
782 Shanghai
ALEXANDRIA
4124 Sea
10
74369,00
793 Hamburg
ALEXANDRIA
2913 Air
12
6594,00
15 Frankfurt
4177 Air 4076 Sea
2 9
3530,00 76848,00
14 Frankfurt 674 Hamburg
2912 Air
1
30,00
0 Frankfurt
CAIRO
4176 Air
1
68,00
0 Frankfurt
CAIRO
4055 Sea
2
33985,86
180 Laem Chabang ALEXANDRIA
4098 Sea
4
67971,72
359 Laem Chabang ALEXANDRIA
3527 Air
8
31,09
0 Frankfurt
4173 Sea 4223 Air
12 12
4168,00 5944,00
40 Hamburg 38 Frankfurt
ALEXANDRIA CAIRO
4132 Sea
5
25630,00
172 Hamburg
ALEXANDRIA
4072 Sea
8
3172,00
40 Shanghai
ALEXANDRIA
4134 Sea
49
124500,39
225 Hamburg
ALEXANDRIA
4204 Air
12
11993,64
27 Frankfurt
4121 Sea
9
106170,00
4074 Sea
4
63720,80
317 Shanghai
ALEXANDRIA
4109 Sea
6
93650,00
299 Antwerpen
ALEXANDRIA
3510 Air
4
97,00
0 New York
CAIRO
2915 Air
1
44,00
0 Frankfurt
CAIRO
4231 Air
1
293,50
1 Frankfurt
CAIRO
31
255230,00
4111 Sea
1195 Jebel Ali Port
4321 Hamriya Port
CAIRO CAIRO ALEXANDRIA
CAIRO
CAIRO
DAMIETTA
DAMIETTA
AMBER BEVERLY MSC SEATTLE #MSCUKG446 426 MS6051 MS541 #07792858861 LH8290 MSC ATHOS #MSCUKG402 643 MS6051/19 /MS541/20 #07792858905 MS6051/19 /MS541/20 AMBER BEVERLY #AB1601LCBA LX01 AMBER BEVERLY #AB1601LCBA LX02 KL8350 KL553 #074-2987 3756 MSC ANTIGUA KL8350 / MP8940 MSC CATERINA #MSCUKG451 384 HANJIN TABUL #YMLUM2313 26807 MSC ANTIGUA #MSCUKG459 932 ZZ404 / MS541 #0779295607 6 BBC CAROLINA # COSCO EUROPE #YMLUM2313 25318 MSC SEATTLE #MSCUKG446 434 CV3167/07 / CV5801/09 #17216887404 MS540 / MS541 #0779295608 0 MS6051 / MS541 #0779295611 3 BBC CAROLINA #
2016-03-31
2016-04-22
2016-06-05
2016-06-05
2016-06-13 42MBL
2016-05-14
2016-05-15
2016-05-28
2016-05-28
2016-06-13 41MBL
2016-05-24
2016-05-25
2016-05-28
2016-05-28
2016-06-13 31MB ; 32MB
2016-05-31 2016-05-04
2016-05-31 2016-05-04
2016-05-31 2016-05-21
2016-06-01 2016-05-21
2016-06-13 00EKH; 20UEN 2016-06-14 42MBL
2016-05-19
2016-05-19
2016-05-20
2016-05-20
2016-06-14 00MB
2016-05-19
2016-05-20
2016-05-20
2016-05-20
2016-06-14 00MB
2016-04-20
2016-05-02
2016-06-02
2016-06-05
2016-06-15 41MBR
2016-05-02
2016-05-02
2016-06-02
2016-06-05
2016-06-15 31MBR; 32MBR
2016-05-24
2016-06-06
2016-06-09
2016-06-09
2016-06-20 32MKA; 42MKA
2016-05-25 2016-06-05
2016-05-25 2016-06-05
2016-06-12 2016-06-09
2016-06-12 2016-06-09
2016-05-04
2016-05-18
2016-05-28
2016-05-28
2016-06-20 31BAC; 32BAC; 41BAC; 42BAC
2016-05-11
2016-05-11
2016-06-06
2016-06-06
2016-06-21 31MBL; 32MBL; 41MBL; 42MBL
2016-05-23
2016-05-25
2016-06-11
2016-06-12
2016-06-03
2016-06-03
2016-06-08
2016-06-08
2016-06-21 31MB ; 32MB ; 41MB ; 42MB
2016-05-13
2016-05-26
2016-06-06
2016-06-09
2016-06-22 32MBR
2016-05-04
2016-05-04
2016-06-05
2016-06-05
2016-05-14
2016-05-15
2016-05-28
2016-05-28
2016-05-06
2016-05-08
2016-05-10
2016-05-10
2016-05-14
2016-06-25 42MKA
2016-06-08
2016-06-08
2016-06-10
2016-06-10
2016-06-15
2016-06-25 00MK
2016-06-11
2016-06-11
2016-06-15
2016-06-15
2016-06-20
2016-06-25
2016-05-13
2016-05-23
2016-06-06
2016-06-09
2016-06-21
2016-06-21
2016-06-15
2016-06-20 00C 2016-06-20 00C ; 30C ; 40C
2016-06-21 31MB ; 32MB ; 41MB ; 42MB
2016-06-23 31MBL; 32MBL; 41MBL; 42MBL
2016-06-23 00
2016-06-25 32MBR
4143 Sea
12
38530,00
110 Hamburg
ALEXANDRIA
CAP HARRIETT #SEJJSGL182 131
2016-05-25
2016-05-24
2016-06-04
2016-06-04
4123 Sea
8
142459,30
772 Hamburg
ALEXANDRIA
2016-06-01
2016-06-01
2016-06-18
2016-06-18
2016-06-28
2016-06-26 31UBA; 32UBA
4197 Air 4091 Sea
6 8
55,20 37080,00
1 Frankfurt 168 Hamburg
CAIRO ALEXANDRIA
2016-06-04 2016-04-28
2016-06-04 2017-07-28
2016-06-05 2017-07-14
2016-06-06 2016-05-15
2016-06-10 2017-07-24
2016-06-26 00 2016-06-27 31MKC; 32MKC; 41MKC; 42MKC
4168 Sea
1
7900,00
2016-05-20
2016-05-22
2016-06-04
2016-06-04
2016-06-14
2016-06-27 00
4136 Sea
2
35118,00
193 Hamburg
ALEXANDRIA
2016-05-25
2016-05-25
2016-06-12
2016-06-12
2016-06-22
2016-06-27 31UBA; 32UBA
3520 Sea
2
740,00
2 Hamburg
ALEXANDRIA
2016-05-18
2016-05-18
2016-06-04
2016-06-04
2016-06-14
2016-06-27 42MBR
3521 Sea
1
230,00
0 Hamburg
ALEXANDRIA
2016-05-10
2016-05-18
2016-06-04
2016-06-04
2016-06-14
2016-06-27 42BAC
4147 Sea
11
132334,00
305 Antwerpen
ALEXANDRIA
2016-05-13
2016-05-22
2016-06-04
2016-06-04
2016-06-14
2016-06-27 00
4099 Sea
14
66736,58
323 Laem Chabang ALEXANDRIA
2016-05-15
2016-05-10
2016-06-06
2016-06-15
1
29650,00
140 Danzig
2016-06-06
2016-06-06
2016-06-07
2016-06-07
2016-06-12
2016-06-29 30EKH
4060 Sea
26
6798,00
23 Norfolk
DAMIETTA
2016-04-09
2016-04-25
2016-05-09
2016-05-09
2016-05-19
2016-06-30 42MKA
4081 Sea
39
13772,00
54 Norfolk
DAMIETTA
2016-05-13
2016-05-12
2016-05-28
2016-05-28
2016-06-07
2016-06-30 31MKA; 32MKA
3511 Sea
2
130,00
0 Norfolk
DAMIETTA
2016-04-28
2016-04-28
2016-05-09
2016-05-09
2016-05-19
2016-07-01 42MKA
4133 Sea
4
64000,00
402 Antwerpen
ALEXANDRIA
2016-04-30
2016-06-03
2016-06-15
2016-06-15
2016-06-25
2016-07-03 31MB ; 32MB
4115 Sea
2
12400,00
103 Antwerpen
ALEXANDRIA
2016-05-06
2016-06-03
2016-06-15
2016-06-15
2016-06-25
2016-07-03 31MBR; 32MBR
4155 Sea
34
169759,00
1662 Antwerpen
ALEXANDRIA
2016-05-12
2016-06-03
2016-06-15
2016-06-15
2016-06-25
2016-07-03 31MBV; 31MPR; 32MBV; 32MPR
4159 Sea
2
46500,00
173 Antwerpen
ALEXANDRIA
2016-05-17
2016-06-03
2016-06-15
2016-06-15
2016-06-25
2016-07-03 30EKH
4156 Sea
1
29900,00
140 Antwerpen
ALEXANDRIA
2016-05-19
2016-03-06
2016-06-15
2016-06-15
2016-06-25
2016-07-03 20UEN
4149 Air
9
756,44
2016-05-31
2016-05-31
2016-06-01
2016-06-01
2016-06-06
2016-07-03 11MB
4225 Air
1
1105,00
2016-06-15
2016-06-15
2016-06-17
2016-06-17
2016-06-22
2016-07-03 42MBR
4202 Air
1
2016-06-03
2016-06-03
2016-06-01
2016-06-01
2016-06-06
2016-07-03 00
4189 Air
1
MSC ALTAMIRA #MSCURV708 996 KL8530 KL553 MSC PINA #MSCUKG382 159 MSC MELISSA #MSCURV732 970 MSC ANTIGUA #MSCURV709 093 MSC CATERINA #MSCURV714 218 MSC CATERINA #MSCURV691 952 MSC MELISSA #MSCURV722 575 MSC ROCHELLE #MSCUWT869 010 VDA2250/06 #41201479870 NINGBO EXPRESS #NRWB32475 87 OOCL ITALY #HLCUHOU16 0521034 + NINGBO EXPRESS #NREG324757 2 MAPLE INGRID #003 MAPLE INGRID #007 MAPLE INGRID #004 MAPLE INGRID #005 MAPLE INGRID #0104154 MS6051 MS541 #07792858846 EK3737/15 EK9277/17 #17664460922 MS6051 MS541 #07792956043 MS6051 MS541
2016-05-25
2016-05-25
2016-05-27
2016-05-27
2016-06-01
2016-07-03 00MB
4210 Air
40 Antwerpen
ALEXANDRIA
CAIRO
3 Frankfurt
CAIRO
1 Bangkok
CAIRO
204,50
1 Frankfurt
CAIRO
200,00
1 Frankfurt
CAIRO
2016-06-26 00BHT; 41BFT; 42BFT
2016-06-29 32MBR
4144 Sea
2
24200,00
63 Hamburg
ALEXANDRIA
4178 Sea 4054 Sea
2 14
370000,00 66736,58
312 Rotterdam BURULLUS 323 Laem Chabang ALEXANDRIA
4061 Sea
24
82048,00
118 Shanghai Port ALEXANDRIA
4163 Sea
9
9822,00
51 Hamburg
ALEXANDRIA
4090 Sea
35
76810,00
301 Hamburg
ALEXANDRIA
4171 Sea
2
3593,00
15 Hamburg
ALEXANDRIA
4195 Sea 4257 Air
1 5
8250,00 1270,00
38 Hamburg 8 Frankfurt
ALEXANDRIA CAIRO
4258 Air
11
2647,00
22 Frankfurt
CAIRO
4120 Sea
30
17179,65
50 Hamburg
ALEXANDRIA
4158 Sea
15
27640,00
162 Hamburg
ALEXANDRIA
4140 Air
1
664,00
3 Ho Chi Minh
Cairo
3513 Sea
2
1060,00
3 Hamburg
ALEXANDRIA
4162 Sea
1
2370,00
4 Hamburg
ALEXANDRIA
4150 Sea
47
24045,35
81 Hamburg
ALEXANDRIA
4174 Sea
ALEXANDRIA
MSC SEATTLE #MSCURV714 754 BONACIEUX MSC ROCHELLE #MSCUWT842 314 CHONG MING #CPJQCM13S HAALY02 RIO BRAVO #SGL174966 CAP HARRIETT #SGL090747
2016-05-14
2016-05-15
2016-05-28
2016-05-28
2016-06-07
2016-07-04 00EKH
2016-06-09 2016-04-12
2016-06-09 2016-04-12
2016-06-23 2016-05-26
2016-06-23 2016-05-26
2016-07-03 2016-06-05
2016-07-10 31BAT; 32BAT 2016-07-11 41MBR
2016-05-17
2016-05-17
2016-06-18
2016-06-19
2016-06-28
2016-07-12 31BBT; 32BBT
2016-05-23
2016-06-08
2016-06-18
2016-06-18
2016-06-28
2016-07-12 42MBR
2016-05-25
2016-05-25
2016-06-04
2016-06-04
2016-06-14
2016-07-12 32MBR
RIO BRAVO #SGL203921 RIO BRAVO MS540/23 MS541/24 #07792956220 MS6051/30 MS540/01 #07792956275 CAP HAMILTON #SGL139766 CAP HARRIETT + CAP JERVIS #SGL174741 + 56981413
2016-06-08
2016-06-08
2016-06-18
2016-06-18
2016-06-28
2016-07-12 31MBR
2016-06-08 2016-06-23
2016-06-08 2016-06-23
2016-06-18 2016-06-24
2016-06-18 2016-06-24
2016-06-28 2016-06-29
2016-07-12 42BAA 2016-07-12 00MK
2016-06-30
2016-06-30
2016-07-01
2016-07-01
2016-07-06
2016-07-12 00C ; 00UBA; 31UBA; 32UBA; 41UBA; 42UBA; 99UBA
2016-05-04
2016-05-04
2016-05-14
2016-05-14
2016-05-24
2016-05-17
2016-05-25
2016-06-04
2016-06-04
2016-06-14
2016-07-13 31BAB; 31MB ; 32BAB; 32MB ; 41BAB; 41C ; 41MB ; 42BAB; 42C ; 42MB 2016-07-13 00BRU; 20UEN
TH4164/12 / SV831/13 CAP JERVIS #SGL171985 CAP HARRIETT #SEJJSGL174 141
2016-05-19
2016-06-10
2016-07-13 42MBR
2016-05-23
2016-05-23
2016-06-11
2016-06-11
2016-06-21
2016-07-13 41MBL; 42MBL
2016-05-25
2016-05-24
2016-06-04
2016-06-04
2016-06-14
2016-07-13 00UBA
CAP JERVIS #SGL204832
2016-05-30
2016-05-31
2016-06-11
2016-06-11
2016-06-21
CAP JERVIS #SGL186861 MS6051/23 MS541/24 #07792956205 MS540/24 MS541/26 #07792956231 KL8350/02 KL553/03 #07429873885 CAP HARRIETT #SGL173072
2016-06-01
2016-06-01
2016-06-11
2016-06-11
2016-06-21
2016-07-13 00C ; 31MB ; 31UBA; 32MB ; 32UBA; 41MB ; 41UBA; 42BBT; 42UBA 2016-07-13 31BTA; 32BTA
2016-06-23
2016-06-23
2016-06-24
2016-06-24
2016-06-29
2016-07-13 00
2016-06-24
2016-06-24
2016-06-26
2016-06-24
2016-07-01
2016-07-13 00
2016-07-02
2016-07-02
2016-07-03
2016-07-03
2016-07-08
2016-07-13 00EKH
2016-05-25
2016-05-25
2016-06-04
2016-06-04
2016-06-14
2016-07-14 32MBR
12
7288,00
10 Hamburg
4260 Air
1
52,60
0 Frankfurt
CAIRO
4262 Air
1
92,00
0 Frankfurt
CAIRO
3536 Air
1
380,00
3 Frankfurt
CAIRO
4165 Sea
2
4011,00
16 Hamburg
ALEXANDRIA
4146 Sea
8
6890,00
84 Hamburg
ALEXANDRIA
CAP HARRIETT #SGL172945
2016-05-30
2016-05-25
2016-06-04
2016-06-04
2016-07-14 00C
4164 Sea
18
14489,21
38 Hamburg
ALEXANDRIA
CAP JERVIS #SEJJSGL182 075
2016-05-31
2016-05-31
2016-06-11
2016-06-11
2016-07-14 00UBA; 31MB ; 32BJT; 41C ; 41MB ; 41MK ; 42C ; 42MB
4161 Sea
6
11220,00
54 Hamburg
ALEXANDRIA
4252 Air
16
2604,20
20 Düsseldorf
CAIRO
4232 Air
17
6958,93
23 Düsseldorf
CAIRO
4266 Air
3
876,50
3 Frankfurt
CAIRO
4175 Sea
1
4533,31
38 Hamburg
ALEXANDRIA
4180 Sea
3
24719,00
212 Hamburg
ALEXANDRIA
3533 Air
4
15,54
0 Frankfurt
CAIRO
3531 Air
3
7,20
0 Frankfurt
CAIRO
3532 Air
11
162,98
1 Frankfurt
CAIRO
4130 Sea
50
77655,00
406 Koper
ALEXANDRIA
4166 Sea
4
37042,90
308 Hamburg
ALEXANDRIA
3528 Air
1
79,00
0 Frankfurt
CAIRO
3538 Air
1
86,00
0 Frankfurt
CAIRO
4196 Air
2
520,00
1 Roma
CAIRO
4157 Sea
8
11248,68
50 Hamburg
ALEXANDRIA
4145 Sea
12
120644,00
925 Hamburg
ALEXANDRIA
4192 Sea
3
11440,00
115 Antwerpen
ALEXANDRIA
4141 Sea
8
2610,00
14 Hamburg
ALEXANDRIA
3518 Sea
2
1060,00
3 Hamburg
ALEXANDRIA
4160 Sea
9
85394,80
623 Hamburg
ALEXANDRIA
4215 Air
7
111,60
1 Frankfurt
CAIRO
CAP JERVIS #SEJJSGL182 079 MS540/23 MS541/24 #07792956194 MS540/21 MS541/22 #07792956135 MS6051/02 MS541/03 #07792965795 CAP HARRIETT #SEJJSGL174 147
2016-05-31
2016-05-31
2016-06-11
2016-06-11
2016-06-21
2016-07-14 00ABA
2016-06-23
2016-06-23
2016-06-24
2016-06-24
2016-06-29
2016-07-14 00BZK; 00C ; 42C ; 99UBA
2016-06-21
2016-06-21
2016-06-22
2016-06-22
2016-06-27
2016-07-16 00; 00BZK; 31MB ; 32MB ; 41MK ; 42C ; 42MB
2016-07-02
2016-07-02
2016-07-03
2016-07-03
2016-07-08
2016-07-16 00EKH; 22MB ; 22MK
2016-05-25
2016-05-24
2016-06-04
2016-06-04
2016-06-14
2016-07-17 30UBA
CAP JERVIS #SGL186691 LH104/18 LH586/18 #02052165492 LH8290/19 #02052165503 KL8350/26 KL553/27 #07429873874 MSC ALTAMIRA #MSCURV748 422 CAP HARRIETT #SGL176267
2016-06-01
2016-06-01
2016-06-11
2016-06-11
2016-06-21
2016-07-17 00BZK; 00EKH; 30EKH
2016-06-14
2016-06-18
2016-06-18
2016-06-18
2016-06-23
2016-07-17 31MKA
2016-06-19
2016-06-20
2016-06-19
2016-06-19
2016-06-24
2016-07-17 00MB
2016-06-28
2016-06-28
2016-06-30
2016-06-30
2016-07-05
2016-07-17 11MB
2016-05-13
2016-06-01
2016-06-18
2016-06-18
2016-05-26
2016-05-25
2016-06-04
2016-06-04
2016-06-14
2016-07-18 41MB ; 42MB
KL8350/16 KL553/17 KL8354/28 MP8940/30 #07429873896 QR110/28 QR1301/01 #15799198304 MSC AZOV #MSCURV778 320 RIO DE LA PLATA #SGL163026 NORTHERN MONUMENT #MSCURV793 105 CAP HARRIETT
2016-06-17
2016-06-17
2016-06-18
2016-06-18
2016-06-23
2016-07-18 31MPR
2016-06-28
2016-06-28
2016-06-30
2016-06-30
2016-07-05
2016-07-18 41BAT
2016-06-28
2016-06-28
2016-07-01
2016-07-01
2016-07-06
2016-07-18 00ABA
2016-06-11
2016-06-13
2016-06-25
2016-06-25
2016-07-07
2016-07-19 32MKA
2016-05-19
2016-05-18
2016-05-29
2016-05-28
2016-06-08
2016-07-19 31MPB; 32MPB
2016-06-11
2016-06-13
2016-06-25
2016-06-25
2016-07-05
2016-07-19 00MB
CAP JERVIS #SGL172000 CAP JERVIS #SGL186273 KL8366/07 KL0553/08 #07429873922
2016-05-31
2016-05-31
2016-06-11
2016-06-11
2016-06-21
2016-07-20 31MBL; 32MBL
2016-06-01
2016-06-01
2016-06-11
2016-06-11
2016-06-21
2016-07-20 00BZK; 20UEN; 41MB ; 42MB
2016-07-08
2016-07-10
2016-07-12
2016-07-12
2016-07-17
2016-07-20 00C ; 31C ; 32C ; 41C ; 42C
2016-05-20
2016-07-18 41BAT; 42BAT
2016-05-31
2016-07-20 00ABA
4279 Air
2
134,30
1 Frankfurt
CAIRO
4268 Air
1
378,50
1 Shanghai
CAIRO
3530 Air
3
36,00
0 Frankfurt
CAIRO
4142 Sea
5
1853,00
4 Hamburg
ALEXANDRIA
3526 Sea
6
3240,00
6 Hamburg
ALEXANDRIA
4153 Sea
22
168481,00
1836 Hamburg
ALEXANDRIA
4205 Sea
13
11344,09
39 Hamburg
ALEXANDRIA
3529 Sea
10
7440,00
16 Hamburg
ALEXANDRIA
4296 Air
1
38,00
0 Frankfurt
CAIRO
4304 Air
3
239,10
1 Frankfurt
CAIRO
4182 Sea
44
174124,00
852 Hamburg
4179 Sea
14
66736,58
4190 Sea
1
256,00
1 Hamburg
4234 Air
8
11259,68
53 Frankfurt
31
255230,00
4251 Air
2
1086,00
1 Shanghai
CAIRO
4282 Air
2
63,00
0 Frankfurt
CAIRO
3502 Sea
1
270,00
4154 Sea
2
15150,00
115 Hamburg
ALEXANDRIA
4206 Sea
3
19852,61
192 Hamburg
ALEXANDRIA
4265 Air
1
56,00
0 Frankfurt
CAIRO
2916 Air
1
65,00
0 Frankfurt
CAIRO
4295 Air
3
1174,72
5 Frankfurt
CAIRO
2914 Air
2
113,00
0 Frankfurt
CAIRO
4199 Sea
ALEXANDRIA
323 Laem Chabang ALEXANDRIA
4321 Hamriya Port
ALEXANDRIA CAIRO
DAMIETTA
1 Shanghai Port ALEXANDRIA
MS6051/06 MS541/08 #07792966123 EK9889/10 #17666379972 KL8440/01 KL553/03 #0742987900 RIO BRAVO #SGL159426 RIO BRAVO #SGL191512 RIO BRAVO #SGL218974 RIO BLANCO #SGL223593 RIO BLANCO #SGL237251 LH7181/22 LH8290/24 MS4541/19 MS541/20 #07792971340 NORTHERN MONUMENT #MSCUKG519 974 BOX HONG KONG #MSCUWT905 616 MSC AZOV #MSCURV779 112 KL8358/21 MP8940/23 #07429873852 MATSUSAKA #HAMDAM01 EK9873 / 01 #17666379950 MS6051/07 MS541/08 #07792966112 CHONG MING #CPJQCM13S HAALY03 MAPLE INGRID #010 RIO BLANCO #SGL218691 MS540/24 MS541/26 #07792956242 MS6051/25 MS541/26 #07792956253 KL8440/15 MP8910/18 MS6051 / MS541 #07792956091
2016-07-06
2016-07-06
2016-07-08
2016-07-08
2016-07-13
2016-07-20 00C
2016-07-10
2016-07-10
2016-07-11
2016-07-11
2016-07-16
2016-07-20 42MKA
2016-07-06
2016-07-06
2016-07-09
2016-07-09
2016-07-14
2016-07-20 22MK
2016-06-08
2016-06-08
2016-06-18
2016-06-18
2016-06-28
2016-07-21 00ABA
2016-06-08
2016-06-08
2016-06-18
2016-06-18
2016-06-28
2016-07-21 31BTA; 32BTA
2016-06-14
2016-06-15
2016-06-25
2016-06-25
2016-07-05
2016-07-21 31MBL; 32MBL
2016-06-15
2016-06-15
2016-06-25
2016-06-25
2016-07-05
2016-06-15
2016-06-15
2016-06-25
2016-06-25
2016-07-05
2016-07-21 00C ; 31MB ; 32MB ; 41MB ; 42MB 2016-07-21 10URA
2016-07-13
2016-07-21
2016-07-21 00ABA
2016-07-19
2016-07-19
2016-07-20
2016-07-20
2016-07-25
2016-07-21 00MB
2016-06-11
2016-06-13
2016-06-27
2016-06-27
2016-07-07
2016-07-21 00C ; 00EKH; 00UBA; 20EKH; 30EKH; 41MB
2016-06-07
2016-06-07
2016-07-05
2016-07-05
2016-07-14
2016-07-22 31MBR
2016-06-08
2016-06-08
2016-06-25
2016-06-25
2016-07-05
2016-07-22 10URA
2016-06-15
2016-06-21
2016-06-23
2016-06-23
2016-06-28
2016-07-22 31MKA
2016-06-20
2016-06-21
2016-07-03
2016-07-03
2016-07-13
2016-07-22 31MBR
2016-07-04
2016-07-04
2016-07-06
2016-07-06
2016-07-11
2016-07-22 00
2016-07-07
2016-07-07
2016-07-08
2016-07-08
2016-07-13
2016-07-22 00C
2016-05-17
2016-05-17
2016-06-18
2016-06-20
2016-06-28
2016-07-25 31BBT
2016-06-01
2016-06-03
2016-06-15
2016-06-15
2016-06-26
2016-07-25 31MBL; 32MBL
2016-06-15
2016-06-15
2016-06-25
2016-06-25
2016-07-05
2016-07-25 31MB ; 32MB
2016-06-24
2016-06-24
2016-06-26
2016-06-24
2016-07-01
2016-07-25 00MK
2016-06-25
2016-06-25
2016-06-26
2016-06-26
2016-07-01
2016-07-25 00MB
2016-07-15
2016-07-15
2016-07-18
2016-07-18
2016-07-23
2016-07-25 00; 22MB ; 32MB
2016-06-08
2016-06-08
2016-06-10
2016-06-10
2016-06-15
2016-07-26 00MB
4216 Sea
36
11832,00
41 Hamburg
ALEXANDRIA
4229 Sea
1
410,00
2 Hamburg
ALEXANDRIA
4264 Air
6
810,00
4 Frankfurt
CAIRO
4290 Air
3
355,00
3 Frankfurt
CAIRO
4291 Air
1
480,00
1 Frankfurt
CAIRO
4172 Sea
9
118000,00
4211 Sea
13
20411,89
4207 Sea
2
18759,93
154 Hamburg
ALEXANDRIA
4200 Sea
8
8883,00
50 Hamburg
ALEXANDRIA
4227 Sea
38
219086,00
995 Antwerpen
ALEXANDRIA
2
77,00
4167 Sea
111
60095,94
321 Ho Chi Minh
ALEXANDRIA
4220 Sea
4
48342,60
345 Hamburg
ALEXANDRIA
4289 Air
5
400,00
1 Frankfurt
CAIRO
4071 Sea
4
1020,00
4 Shanghai
ALEXANDRIA
4117 Sea
15
430443,00
955 Antwerpen
ALEXANDRIA
4193 Sea
18
42012,00
260 Hamburg
ALEXANDRIA
4235 Sea
13
7938,82
4185 Sea
88
118410,00
244 Shanghai
ALEXANDRIA
4169 Sea
2
773,00
4 Hamburg
ALEXANDRIA
4224 Sea
2
6600,00
43 Antwerpen
ALEXANDRIA
4194 Sea
2
18429,00
157 Hamburg
ALEXANDRIA
4218 Sea
48
75340,00
398 Hamburg
ALEXANDRIA
4302 Air
1260 Ho Chi Minh Port 43 Hamburg
1 Helsinki
13 Genua
ALEXANDRIA ALEXANDRIA
CAIRO
ALEXANDRIA
RIO BLANCO #SEJJSGL225 395 RIO MADEIRA #SEJJSGL293 271 MS6051/02 MS541/03 #07792956264 MS541/10 #07792966156 MS541/10 #07792966160 ABB FELINA #ALEX-001 RIO BRAVO #SGL221911 RIO BLANCO #SGL219153 MSC AGADIR #MSCUKG545 508 THORCO ARVIAT #019 QR2015/15 QR1301/19 #15700117121 HAMMONIA INTERNUM #604640675 EIO DE LA PLATA #SEJJSGL228 111 MS540/14 MS541/15 #07792966204 HANJIN TABUL #YMLUM2313 26808 MAPLE INGRID #006 MSC AZOZ #MSCURV789 624 JOLLY CHRISTALLO #G0699261 GUNDE MAERSK #MSCUYR373 914 SAFMARINE NUBA #SGL224971 THORCO ARVIAT #020 THORCO ARVIAT #022 RIO DE LA PLANTA #SEJJSGL227 032
2016-06-15
2016-06-14
2016-06-25
2016-06-25
2016-07-05
2016-07-26 00C ; 10C ; 30C ; 31C ; 32C ; 41C ; 42C
2016-06-29
2016-06-29
2016-07-09
2016-07-09
2016-07-19
2016-07-26 22MB
2016-07-01
2016-07-06
2016-07-03
2016-07-03
2016-07-08
2016-07-26 00
2016-07-08
2016-07-08
2016-07-10
2016-07-10
2016-07-15
2016-07-26 00
2016-07-08
2016-07-08
2016-07-10
2016-07-10
2016-07-15
2016-07-26 00
2016-06-02
2016-06-03
2016-07-01
2016-07-01
2016-07-11
2016-07-27 31MBR
2016-06-15
2016-06-14
2016-06-25
2016-06-25
2016-07-05
2016-07-27 00BZK
2016-06-15
2016-06-15
2016-06-25
2016-06-25
2016-07-05
2016-07-27 32MB
2016-06-15
2016-06-15
2016-07-02
2016-07-02
2016-07-12
2016-07-27 41MBR
2016-06-22
2016-06-23
2016-07-05
2016-07-03
2016-07-15
2016-07-27 00UEN
2016-07-15
2016-07-15
2016-07-19
2016-07-19
2016-07-24
2016-07-27 00ABA
2016-06-06
2016-06-06
2016-07-04
2016-07-04
2016-07-14
2016-07-28 31MBR
2016-06-22
2016-06-23
2016-07-02
2016-07-02
2016-07-12
2016-07-28 30UEN; 40UEN
2016-07-12
2016-07-14
2016-07-15
2016-07-15
2016-07-20
2016-07-28 00MB
2016-05-13
2016-05-11
2016-06-06
2016-06-13
2016-06-16
2016-07-30 31MBL; 32MBL; 41MBL; 42MBL
2016-06-03
2016-06-03
2016-06-15
2016-06-15
2016-06-25
2016-07-30 00BZK
2016-06-08
2016-06-08
2016-06-25
2016-06-25
2016-07-05
2016-07-30 10URA; 31MBV; 31MPR
2016-07-05
2016-07-05
2016-07-10
2016-07-11
2016-07-20
2016-07-30 10URA
2016-06-01
2016-06-01
2016-07-01
2016-07-01
2016-07-11
2016-07-31 10URA
2016-06-13
2016-06-06
2016-06-18
2016-06-19
2016-06-28
2016-07-31 00C
2016-06-15
2016-06-23
2016-07-05
2016-07-05
2016-07-15
2016-07-31 31C ; 32C
2016-06-20
2016-06-23
2016-07-05
2016-07-04
2016-07-15
2016-07-31 00EKH
2016-06-22
2016-06-23
2016-07-02
2016-07-02
2016-07-12
2016-07-31 31BAT; 32BAT
4273 Air
9
143,80
1 Frankfurt
CAIRO
4131 Sea
6
128812,04
230 Hamburg
ALEXANDRIA
4219 Sea
8
157500,80
569 Hamburg
ALEXANDRIA
4239 Sea
65
32500,00
422 Hamburg
ALEXANDRIA
4299 Air
7
154,90
1 Frankfurt
CAIRO
3500 Sea
4
878,00
7 Shanghai
ALEXANDRIA
4307 Air
1
268,00
2 Frankfurt
CAIRO
4181 Sea
5
58700,00
4188 Sea
34
171453,16
4201 Sea
35
4151 Sea
117
4152 Sea 4254 Sea
166 Antwerpen
ALEXANDRIA
474 Mumbai
ALEXANDRIA
76810,00
301 Hamburg
ALEXANDRIA
53100,00
818 Hamburg
ALEXANDRIA
35
76810,00
301 Hamburg
ALEXANDRIA
389 Antwerpen
ALEXANDRIA
10
97000,00
2918 Air
6
216,80
1 Frankfurt
CAIRO
4305 Air
2
404,00
1 Frankfurt
CAIRO
4308 Air
1
236,00
2 Frankfurt
CAIRO
4301 Air
3
47,50
0 Frankfurt
CAIRO
4228 Sea
15
67797,98
325 Laem Chabang ALEXANDRIA
4222 Sea
1
29900,00
140 Antwerpen
ALEXANDRIA
4217 Sea
7
8483,00
12 Hamburg
ALEXANDRIA
4274 Sea
25
13426,00
39 Hamburg
ALEXANDRIA
4209 Sea
4
25985,00
160 Hamburg
ALEXANDRIA
4230 Sea
14
14528,21
70 Hamburg
ALEXANDRIA
MS4541/21 MS541/22 #07792971373 MSC LUCIANA #MSCUKG401 801 THORCO ARVIAT #018 MSC ATHOS #MSCUKG595 438 MS6051/18 MS541/20 #07792971325 HANJIN GREECE #YMLUM2313 40805 MS4541/19 MS541/20 #07792971351 MSC LORETTA #MSCURV758 660 ABB FELINA #MUM-ALE001 CAP JERVIS #SGL219131 RIO BRAVO #569790471 RIO DE LA PLATA #SGL219112 THORCO ASIA #017 MS4541/19 MS541/20 #07792971336 MS6051/22 MS541/23 #07792971406 MS4541/21 MS541/22 #07792971362 MS6051/21 MS541/22 #07792971395 BOX HONG KONG #MSCUWT916 092 THORCO ARVIAT #017 MSC AGADIR #MSCURV809 000 RIO BRAVO #SGL341266 MSC SEATTLE #MSCUKG549 500 RIO MADEIRA #SGL269994
2016-07-21
2016-07-21
2016-07-22
2016-07-22
2016-07-27
2016-07-31 00C ; 30C ; 40C
2016-05-12
2016-05-12
2016-05-28
2016-05-28
2016-06-07
2016-08-01 41BAT; 42BAT
2016-06-22
2016-06-23
2016-07-05
2016-07-05
2016-07-15
2016-08-01 30UEN; 40UEN
2016-06-29
2016-06-29
2016-07-16
2016-07-16
2016-07-26
2016-08-01 31BAA; 32BAA
2016-07-18
2016-07-18
2016-07-20
2016-07-20
2016-07-25
2016-08-01 00MB ; 00MK
2016-06-15
2016-06-14
2016-07-11
2016-07-11
2016-07-25
2016-08-01 31MBR; 32MBR; 41MBR; 42MBR
2016-07-19
2016-07-19
2016-07-20
2016-07-20
2016-07-25
2016-08-01 00MB
2016-05-29
2016-05-29
2016-06-12
2016-06-12
2016-06-22
2016-08-02 00
2016-06-18
2016-06-18
2016-06-30
2016-06-30
2016-07-10
2016-08-02 10URA
2016-07-06
2016-07-06
2016-07-16
2016-07-16
2016-07-26
2016-08-02 22MBR
2016-06-08
2016-06-08
2016-06-18
2016-06-18
2016-06-28
2016-08-03 41XKA
2016-06-22
2016-06-23
2016-07-02
2016-07-02
2016-07-12
2016-08-03 31MBR
2016-07-04
2016-07-05
2016-07-16
2016-07-17
2016-07-26
2016-08-03 11UHA
2016-07-19
2016-07-19
2016-07-20
2016-07-20
2016-07-25
2016-08-03 00MB
2016-07-22
2016-07-22
2016-07-23
2016-07-23
2016-07-28
2016-08-03 41MK ; 42C
2016-07-21
2016-07-21
2016-07-22
2016-07-23
2016-07-27
2016-08-03 00EKH
2016-07-21
2016-07-21
2016-07-22
2016-07-22
2016-07-27
2016-08-03 00; 22MK
2016-06-14
2016-06-14
2016-07-12
2016-07-12
2016-07-22
2016-08-03 22MBR
2016-06-22
2016-06-23
2016-07-05
2016-07-05
2016-07-15
2016-08-03 00EKH
2016-06-15
2016-06-15
2016-07-02
2016-07-02
2016-07-12
2016-08-04 00ABA
2016-07-13
2016-07-13
2016-07-23
2016-07-23
2016-08-02
2016-08-04 31MBR
2016-06-18
2016-06-19
2016-07-02
2016-07-02
2016-07-12
2016-08-06 00EKH
2016-06-29
2016-06-29
2016-07-09
2016-07-09
2016-07-19
2016-08-06 11MB ; 20EKH; 31MB ; 41MB
4114 Sea
4
480,00
1 Hamburg
ALEXANDRIA
4247 Sea
3
9450,00
65 Antwerpen
ALEXANDRIA
4241 Sea
6
4400,00
38 Hamburg
ALEXANDRIA
3534 Sea
2
400,00
4238 Sea
52
20600,00
396 Hamburg
ALEXANDRIA
4240 Sea
6
127702,04
230 Hamburg
ALEXANDRIA
4113 Sea
4
18707,60
243 Rijeka
ALEXANDRIA
4272 Sea
2
22615,00
125 Antwerpen
ALEXANDRIA
4208 Sea
2
19017,14
154 Abu Dhabi
DAMIETTA
3524 Sea
4
243,20
1 Hamburg
ALEXANDRIA
4139 Sea
8
11404,00
26 Hamburg
ALEXANDRIA
4256 Sea
4
25985,00
160 Antwerpen
ALEXANDRIA
4255 Sea
3
15424,00
139 Antwerpen
ALEXANDRIA
4246 Sea
13
9676,90
4280 Sea 4309 Air
1 6
4315 Air
1 Antwerpen
ALEXANDRIA
70 Jebel Ali Port
ALEXANDRIA
10105,00 2386,00
86 Hamburg 14 Frankfurt
ALEXANDRIA CAIRO
2
65,50
0 Frankfurt
CAIRO
3542 Air
5
50,23
0 Frankfurt
CAIRO
4311 Air
1
60,00
0 Jebel Ali
CAIRO
4198 Sea
13
9676,90
4191 Sea
14
29980,00
4236 Sea
1
1872,00
3535 Sea
4
4267 Sea
2
70 Jebel Ali Port
DAMIETTA
59 Izmir
ALEXANDRIA
6 Mumbai
ALEXANDRIA
243,20
1 Hamburg
ALEXANDRIA
1620,00
4 Hamburg
ALEXANDRIA
MSC PINA #MSCUKG579 911 MSC MELISSA #MSCUKG586 643 MSC ATHOS #MSCUKG596 691 MSC FLAMINIA #MSCURV877 593 CAP JERVIS #SGL275611 RIO DE LA PLATA #SGL255555 MAERSK ALTAIR #TBA MSC FLAMINIA #MSCURV878 476 MAERSK TAIKUNG #956822984 RIO BLANCO #569791149 MSC ATHOS #MSCUKG597 665 THORCO ASIA #019 THORCO ASIA #018 CHARLOTTE SCHULTE #957085169 RIO BRAVO # MA4541/28 MS541/29 #07792971465 MS6051/29 MS541/31 #07792971480 KL8350/04 KL 553/05 #07429873992 MS913/29 #07796060532 CARDIFF #956858176 MARTHA A #ARKIZM0000 100237 ABB FELINA #MUM-ALE003 MSC ARBATAX #MSCUKG599 679
2016-06-22
2016-06-22
2016-07-09
2016-07-09
2016-07-19
2016-08-06 31CYE; 32CYE; 41CYE; 42CYE
2016-06-25
2016-06-26
2016-07-09
2016-07-09
2016-07-19
2016-08-06 00EKH; 30EKH; 40EKH
2016-06-29
2016-06-29
2016-07-16
2016-07-16
2016-07-26
2016-08-07 21MBR; 22MBR
2016-07-09
2016-07-10
2016-07-24
2016-07-25
2016-08-03
2016-08-07 00UEN
2016-07-06
2016-07-06
2016-07-16
2016-07-16
2016-07-26
2016-08-07 32BAA
2016-06-23
2016-06-23
2016-07-02
2016-07-02
2016-07-12
2016-08-07 31BAT; 32BAT
2016-06-10
2016-06-18
2016-07-07
2016-07-07
2016-07-17
2016-08-08 31CYE; 32CYE; 41CYE; 42CYE
2016-07-10
2016-07-10
2016-07-23
2016-07-25
2016-08-02
2016-08-08 00EKH
2016-06-08
2016-06-08
2016-06-23
2016-06-23
2016-07-03
2016-08-09 31MB
2016-06-15
2016-06-15
2016-06-25
2016-06-25
2016-07-05
2016-08-10 41XKA
2016-06-29
2016-06-29
2016-07-16
2016-07-16
2016-07-26
2016-08-10 31CYE; 32CYE; 41CYE; 42CYE
2016-07-04
2016-07-05
2016-07-16
2016-07-17
2016-07-26
2016-08-10 20EKH
2016-07-04
2016-07-05
2016-07-16
2016-07-17
2016-07-26
2016-08-10 00UEN
2016-07-06
2016-07-04
2016-07-14
2016-07-14
2016-07-24
2016-08-10 22MBR
2016-07-13 2016-07-28
2016-07-13 2016-07-28
2016-07-23 2016-07-29
2016-07-23 2016-07-29
2016-08-02 2016-08-03
2016-08-10 20EKH 2016-08-10 00; 00C ; 21MBA; 22MBA; 40EKH
2016-07-29
2016-07-29
2016-07-31
2016-07-31
2016-08-05
2016-08-10 00C ; 42MB
2016-08-04
2016-08-05
2016-08-06
2016-08-06
2016-08-11
2016-08-10 22MK
2016-07-29
2016-07-29
2016-07-29
2016-07-29
2016-08-03
2016-08-10 32MBR
2016-05-13
2016-06-13
2016-06-23
2016-06-23
2016-07-03
2016-08-10 31MBR
2016-06-12
2016-06-12
2016-06-20
2016-06-20
2016-06-30
2016-08-11 10URA
2016-06-18
2016-06-18
2016-06-30
2016-06-30
2016-07-10
2016-08-11 10URA
2016-07-06
2016-07-06
2016-07-23
2016-07-25
2016-08-02
2016-08-11 31BAA; 32BAA
CAP JERVIS #SGL319341
2016-07-06
2016-07-06
2016-07-16
2016-07-16
2016-07-26
2016-08-11 10URA; 22MK
3540 Air
2
800,00
3 Frankfurt
CAIRO
KL8440/25 KL553/27 #07429873970 MARTHA A #TR-YAR-ALX15283 RIO BLANCO #SGL345081 KL8352/04 KL553/05 #07429873981 MS4541 MS541 #07792974781 MSC ARBATAX #MSCUKG611 052
2016-07-25
2016-07-25
2016-07-27
2016-07-28
2016-08-01
2016-08-11 20UMA
4233 Sea
6
1650,00
7 Istanbul
ALEXANDRIA
2016-07-05
2016-07-05
2016-07-11
2016-07-11
2016-07-21
2016-08-12 00BZK
4278 Sea
28
17747,70
36 Hamburg
ALEXANDRIA
2016-07-20
2016-07-20
2016-07-30
2016-07-30
2016-08-09
2016-08-14 00ABK; 21MK ; 22MK ; 40EKH
9001 Air
1
161,50
1 Frankfurt
CAIRO
2016-08-04
2016-08-05
2016-08-06
2016-08-06
2016-08-11
2016-08-14 00ABA
4319 Air
3
2840,72
7 Frankfurt
CAIRO
2016-08-04
2016-08-04
2016-08-06
2016-08-06
2016-08-11
2016-08-14 00BZK; 00EKH; 22MK
4261 Sea
10
3752,00
21 Hamburg
ALEXANDRIA
2016-07-06
2016-07-06
2016-07-23
2016-07-25
2016-08-02
2016-08-14 00ABA
4253 Sea
9
3134,13
29 Hamburg
ALEXANDRIA
MSC ARBATAX #MSCURV852 752
2016-07-06
2016-07-06
2016-07-23
2016-07-25
2016-08-02
2016-08-14 00C ; 10URA; 31C ; 32C
4244 Sea
11
13242,00
66 Hamburg
ALEXANDRIA
2016-07-13
2016-07-13
2016-07-31
2016-07-31
2016-08-10
2016-08-14 22MBR; 32MBR
851829,19
11467 Shanghai
ALEXANDRIA
2016-05-17
2016-05-17
2016-06-20
2016-06-18
2016-06-30
2016-08-15 31MBL; 32MBL; 41MBL; 42MBL
2
57,00
0 Frankfurt
CAIRO
2016-08-05
2016-08-09
2016-08-10
2016-08-10
2016-08-15
2016-08-15 00MB
4340 Air
1
93,00
1 Kรถln
CAIRO
2016-08-05
2016-08-06
2016-08-06
2016-08-05
2016-08-11
2016-08-15 32MBR
4327 Air
5
599,00
3 Frankfurt
CAIRO
2016-08-09
2016-08-09
2016-08-10
2016-08-10
2016-08-15
2016-08-15 00BZK; 00C ; 21C ; 42C
4277 Sea
19
26294,00
2016-07-16
2016-07-16
2016-08-02
2016-08-02
2016-08-12
2016-08-15 10URA
4212 Sea
15
29557,00
99 Hamburg
ALEXANDRIA
2016-07-13
2016-07-13
2016-07-31
2016-07-31
2016-08-10
2016-08-15 22MK
4183 Sea
2
30132,00
159 HuangPu
ALEXANDRIA
2016-06-29
2016-06-28
2016-08-03
2016-08-03
2016-08-13
2016-08-16 21MBR; 22MBR
4293 Air
1
38,00
0 Frankfurt
4297 Sea
2
12600,00
86 Hamburg
4250 Sea
42
200209,73
4263 Sea
7
45263,20
4269 Sea
15
9450,00
4292 Sea
85
61220,00
131 Hamburg
ALEXANDRIA
4281 Sea
14
26342,00
155 Hamburg
ALEXANDRIA
MSC CATERINA #MSCUKG584 689 CHONG MING #CPJQCM13S HAALY01 MS6051 MS541 #07792976925 MS541 #07792976903 MS4541 MS541 #07792976936 AL MANAMAH # MSC CATERINA #MSCURV873 832 SMART LISA #SL1602HPAL X02 LH7181/22 LH8290/24 RIO DE LA PLATA #SGL346649 BOX HONG KONG #MSCUWT937 189 MSC LORETTA #MSCUKG617 356 VENTO DI GRECALE #620DGEBALE 837/01 VENTO DI GRECALE #620DGEBALE 843/01 RIO BLANCO #SGL343885
4075 Sea
110
4337 Air
267 Mumbai
ALEXANDRIA
CAIRO ALEXANDRIA
970 Laem Chabang ALEXANDRIA
134 Antwerpen 38 Yilport
ALEXANDRIA ALEXANDRIA
2016-08-08
2016-07-16
2016-08-16 00ABA
2016-07-27
2016-07-26
2016-08-06
2016-08-06
2016-08-16
2016-08-16 21BAC; 22BAC
2016-07-01
2016-06-28
2016-07-30
2016-07-29
2016-08-09
2016-08-17 11MBR; 12MBR; 21MBR
2016-07-03
2016-07-03
2016-07-17
2016-07-17
2016-07-27
2016-08-17 00; 00C ; 21MB ; 22MB
2016-07-26
2016-07-26
2016-08-02
2016-08-01
2016-08-12
2016-08-17 11SGY; 21SGY; 31SGJ; 31SGY; 41SGJ; 41SGY
2016-07-26
2016-07-26
2016-08-02
2016-08-01
2016-08-12
2016-08-17 31SGC; 41SGA; 41SGC
2016-07-20
2016-07-20
2016-07-30
2016-07-30
2016-08-09
2016-08-17 20EKH; 99UBA
4214 Sea
111
60095,94
321 Ho Chi Minh
ALEXANDRIA
4116 Sea
16
56640,00
211 Chennai
ALEXANDRIA
4270 Sea
1
16537,00
86 Hamburg
ALEXANDRIA
4184 Sea
6
135800,00
928 HuangPu
ALEXANDRIA
4248 Sea
12
6418,00
29 Hamburg
ALEXANDRIA
4226 Sea
27
43097,92
118 Mumbai
ALEXANDRIA
4203 Sea
17
59340,00
218 Chennai
ALEXANDRIA
4221 Sea
2
32700,00
4237 Air
1
353,00
1 Frankfurt
CAIRO
2919 Air
4
32,10
0 Frankfurt
CAIRO
4343 Air
1
258,00
0 Frankfurt
CAIRO
4336 Air
10
722,00
5 Frankfurt
CAIRO
4287 Sea
13
9676,90
3537 Air 4275 Sea
1 18
271,65 23160,00
4286 Sea
11
4249 Sea
35
2917 Sea
89 Antwerpen
ALEXANDRIA
70 Jebel Ali Port
DAMIETTA
1 Frankfurt 67 Genua
Cairo ALEXANDRIA
12502,00
66 Hamburg
ALEXANDRIA
76810,00
301 Hamburg
ALEXANDRIA
3
21688,00
117 Hamburg
ALEXANDRIA
4285 Sea
65
217064,86
592 Mumbai
DAMIETTA
4294 Sea
15
19360,00
4271 Sea 4245 Sea
1 31
29900,00 255230,00
4312 Sea
1
6895,00
4187 Sea
8
135943,44
60 Hamburg
140 Antwerpen 4321 Hamriya Port 77 Hamburg
ALEXANDRIA
ALEXANDRIA DAMIETTA ALEXANDRIA
699 Laem Chabang ALEXANDRIA
AEGEAN EXPRESS #SSPHHCM00 202697 MAERSK GATESHEAD #956452068/ 9526452073 RIO DE LA PLATA #SGL341143 SMART LISA #SL1602HPAL X01 RIO BLANCO #SGL345673 ABB FELINA #MUM-ALE002 OCEAN PROBE #MAEU604662 329 + 6046 NORTHERN MONUMENT #MSCURV808 994 MS6051 MS541 #07792975746 KL8350 KL0553 #07429874003 MS6051 MS541 #07792976914 MS6051 MS541 #07792976940 MAERSK GANGES #957252553 LH8296/22 JOLLY PERLA #TO FOLLOW RIO MADEIRA #SGL343883 RIO MADEIRA #SGL287131 RIO BRAVO #SEJJSGL342 821 BBC STEINHOEFT #MUMDAM001 MSC ALTAMIRA #MSCURV934 691 ANNA #019 BBC STEINHOEFT #HAMDAM01 MSC ATHENS #MSCUKG713 478 WESTERN CARMEN #WC1601LCB ALX01
2016-07-05
2016-06-27
2016-07-31
2016-07-29
2016-08-10
2016-08-17 22MBR
2016-05-02
2016-05-02
2016-05-27
2016-05-27
2016-06-06
2016-08-18 41BAT; 42BAT
2016-07-27
2016-07-27
2016-08-06
2016-08-06
2016-08-16
2016-08-18 00UEN
2016-06-29
2016-06-28
2016-08-03
2016-08-03
2016-08-13
2016-08-18 21MBR; 22MBR
2016-07-20
2016-07-20
2016-07-30
2016-07-30
2016-08-09
2016-08-18 00ABA
2016-06-18
2016-06-18
2016-06-30
2016-06-30
2016-07-10
2016-08-19 10URA
2016-06-23
2016-06-22
2016-07-27
2016-07-26
2016-08-06
2016-08-19 31BAT; 32BAT; 42BAT
2016-06-11
2016-06-13
2016-06-25
2016-06-25
2016-07-05
2016-08-21 00
2016-08-03
2016-08-04
2016-08-06
2016-08-06
2016-08-11
2016-08-21 00
2016-08-06
2016-08-06
2016-08-09
2016-08-09
2016-08-14
2016-08-21 00MA ; 00MK
2016-08-09
2016-08-09
2016-08-10
2016-08-10
2016-08-15
2016-08-21 42MB
2016-08-09
2016-08-09
2016-08-10
2016-08-10
2016-08-15
2016-08-21 00; 00MB
2016-08-01
2016-08-01
2016-08-11
2016-08-11
2016-08-21
2016-08-21 21MBR
2016-06-15 2016-07-28
2016-06-21 2016-07-29
2016-06-21 2016-08-03
2016-06-22 2016-08-03
2016-08-13
2016-08-21 00ABA 2016-08-22 00ABA
2016-08-03
2016-08-03
2016-08-13
2016-08-13
2016-08-23
2016-08-23 21MBR; 31MBR
2016-08-03
2016-08-03
2016-08-13
2016-08-13
2016-08-23
2016-08-23 21MBR
2016-07-13
2016-07-13
2016-07-23
2016-07-24
2016-08-02
2016-08-25 00ABK
2016-07-15
2016-07-16
2016-07-29
2016-07-30
2016-08-08
2016-08-25 20URA
2016-07-27
2016-07-28
2016-08-13
2016-08-14
2016-08-23
2016-08-25 10URA; 20URA; 22MK
2016-07-27 2016-07-11
2016-07-27 2016-07-10
2016-08-16 2016-07-29
2016-08-16 2016-07-30
2016-08-26 2016-08-08
2016-08-25 20EKH 2016-08-26 22MBR
2016-08-03
2016-08-03
2016-08-20
2016-08-20
2016-08-30
2016-08-26 10URA
2016-07-24
2016-07-23
2016-08-19
2016-08-19
2016-08-29
2016-08-27 11MBR; 12MBR; 21MBR; 22MBR
9002 Sea
4
38816,00
158 Kallo
ULSAN
4213 Sea
9
118000,00
1260 Ho Chi Minh Port
ALEXANDRIA
4284 Sea
40
60265,94
ALEXANDRIA
4259 Air
2
178,00
209 Ho Chi Minh Port 1 Helsinki
4303 Air
1
322,00
4347 Air
1
2920 Air
CAIRO
2 Denver
CAIRO
22,00
0 Frankfurt
CAIRO
2
2555,00
12 Frankfurt
CAIRO
4359 Air
1
43,00
0 Frankfurt
CAIRO
4367 Air
1
33,00
0 Frankfurt
CAIRO
4338 Air
1
312,00
3 Frankfurt
CAIRO
4357 Air
5
943,30
6 Frankfurt
CAIRO
3547 Air
4
7,60
0 Frankfurt
CAIRO
4373 Air
3
82,40
0 Frankfurt
CAIRO
4314 Sea
13
7957,80
13 Genua
ALEXANDRIA
3541 Sea
9
6334,00
12 Hamburg
ALEXANDRIA
4306 Sea
2
3437,00
15 Hamburg
ALEXANDRIA
4310 Sea
12
9222,35
44 Hamburg
ALEXANDRIA
4323 Sea
15
32080,00
63 Izmir
ALEXANDRIA
4276 Sea
2
32345,00
142 Hamburg
ALEXANDRIA
3539 Sea
18
175,40
1 Hamburg
ALEXANDRIA
4300 Sea
2
8483,00
80 Antwerpen
ALEXANDRIA
MORNING LAURA #EUKOBEKR1 430135 WESTERN CARMEN #WC1601HCM ALX01 YM INVENTIVE # QR2015/01 QR1303/07 #15798004126 BA218 BA155 #12535356053 MS6051 MS541 #07792976984 KL8354 MP8910 #07449772892 MS6051 MS541 #07792979924 MS6051/18 MS541/19 #07792979946 MS6051/25 MS541/26 #07792976951 MS6051/23 MS541/24 #07792980064 KL8440/24 KL553/26 #07449772914 MS6051/23 MS541/24 #07792970075 MARGUERITE #623TGOAALE 203/01 MSC AGADIR #MSCURV976 015 MSC AGADIR #MSCURV955 621 RIO BRAVO #SGL352897 PIERRE A #ARKIZM0000 102812 STELLAR MAESTRO #016 RIO DE LA PLATA #SGL347159 / 57031110 STELLAR MAESTRO #007
2016-07-08
2016-07-07
2016-08-18
2016-08-18
2016-08-28
2016-08-28 11UHA
2016-06-27
2016-07-05
2016-08-19
2016-08-19
2016-08-29
2016-08-29 22MBR
2016-07-26
2016-07-26
2016-08-20
2016-08-18
2016-08-30
2016-08-31 21MBR
2016-07-01
2016-07-04
2016-07-07
2016-07-07
2016-07-12
2016-09-01 00ABA
2016-07-25
2016-07-25
2016-07-31
2016-07-31
2016-08-05
2016-09-01 42MB
2016-08-11
2016-08-15
2016-08-12
2016-08-15
2016-08-17
2016-09-01 00MB
2016-08-12
2016-08-12
2016-08-15
2016-08-15
2016-08-20
2016-09-01 00MB
2016-08-16
2016-08-16
2016-08-17
2016-08-17
2016-08-22
2016-09-01 00
2016-08-18
2016-08-18
2016-08-19
2016-08-19
2016-08-24
2016-09-01 00
2016-08-25
2016-08-25
2016-08-26
2016-08-26
2016-08-31
2016-09-01 00MB
2016-08-23
2016-08-23
2016-08-24
2016-08-24
2016-08-29
2016-09-01 00C ; 00EKH; 41MK ; 42C ; 99UBA
2016-08-24
2016-08-24
2016-08-26
2016-08-26
2016-08-31
2016-09-01 00MK
2016-08-23
2016-08-23
2016-08-24
2016-08-24
2016-08-29
2016-09-01 11MB ; 12MB ; 40EKH
2016-08-07
2016-08-06
2016-08-22
2016-08-21
2016-09-01
2016-09-03 20URA
2016-08-10
2016-08-10
2016-08-28
2016-08-28
2016-09-07
2016-09-03 20URA
2016-08-10
2016-08-10
2016-08-28
2016-08-28
2016-09-07
2016-09-03 11MBR
2016-08-17
2016-08-17
2016-08-27
2016-08-27
2016-09-06
2016-09-03 00ABK; 00C ; 10EKH; 22MK
2016-08-09
2016-08-11
2016-08-16
2016-08-14
2016-08-26
2016-09-04 20URA
2016-08-15
2016-08-17
2016-08-29
2016-08-29
2016-09-08
2016-09-07 41XKA
2016-07-27
2016-07-26
2016-08-27
2016-08-27
2016-09-06
2016-09-08 21MK ; 22MK
2016-08-15
2016-08-17
2016-08-29
2016-08-29
2016-08-09
2016-09-08 00UEN
4326 Sea
6
4292,00
21 Hamburg
ALEXANDRIA
4321 Sea
4
4400,00
31 Hamburg
ALEXANDRIA
4339 Sea 4344 Air
10 5
26516,00 1726,00
145 Izmir 5 Frankfurt
ALEXANDRIA CAIRO
4318 Sea
6
31752,90
231 Hamburg
ALEXANDRIA
4320 Sea
15
63058,75
190 Hamburg
ALEXANDRIA
4354 Sea
5
1675,13
18 Hamburg
ALEXANDRIA
4356 Sea
1
13080,00
77 Hamburg
ALEXANDRIA
4355 Sea
3
4515,00
30 Hamburg
ALEXANDRIA
4378 Air
1
24,10
0 Frankfurt
4329 Air
2
5716,00
4324 Sea
3
54990,00
4288 Sea
31
255230,00
4243 Sea
2
30552,00
159 HuangPu
ALEXANDRIA
4330 Sea
31
59510,20
229 Hamburg
ALEXANDRIA
4242 Sea
6
135800,00
928 HuangPu
ALEXANDRIA
4313 Sea
4
42539,00
189 Hamburg
ALEXANDRIA
4352 Air
1
8,00
4383 Air
1
15,00
4388 Air
2
253,00
4364 Air
2
9108,00
4404 Air
1
44,00
4408 Air
1
4414 Air
1
15 Istanbul 241 Antwerpen 4321 Hamriya Port
CAIRO CAIRO ALEXANDRIA DAMIETTA
0 Ho Chi Minh
CAIRO
0 Frankfurt
CAIRO
2 Düsseldorf
CAIRO
16 Manama
CAIRO
0 Düsseldorf
CAIRO
144,08
1 Frankfurt
CAIRO
31,00
0 Frankfurt
CAIRO
MSC PINA #MSCURV981 643 MSC PINA #MSCURV965 273 MARTHA A # MS4541 MS541 #07792979902 RIO BRAVO #SGL358441 MSC PINA #MSCUKG739 812 RIO BLANCO #SGL359321 RIO BLANCO #SGL359868 RIO BLANCO #SGL359418 MS786/28 #07792980086 LH8341 LH8290 #02052744753 STELLAR MAESTRO #017 INDUSTRIAL MAYA #HAM/DAM/E SS012 UNION DEMETER #UD1606HPAL X02 MSC ATHOS #MSCUKG768 027 UNION DEMETER #UD1606HPAL X01 MSC ATHOS #MSCURV973 269 EK0393 EK0929 #17665083336 MS6051/31 MS541/02 #07796189811 MS541/04 #07796189951 MS506 #07796182553 MS541/02 #07792975761 MS6051/08 MS541/09 #07796190124 MS798/09 #07792595274
2016-08-17
2016-08-17
2016-09-04
2016-09-04
2016-09-14
2016-09-08 21MB ; 22MB
2016-08-17
2016-08-17
2016-09-04
2016-09-04
2016-09-14
2016-09-08 11MBA; 12MBA; 21MBA; 22MBA
2016-08-14 2016-08-16
2016-08-20 2016-08-16
2016-08-26 2016-08-17
2016-08-25 2016-08-17
2016-09-05 2016-08-22
2016-09-09 10URA 2016-09-09 00; 22UBA; 32MKA; 42MKA; 99UBA
2016-08-17
2016-08-17
2016-08-27
2016-08-27
2016-09-06
2016-09-09 10URA
2016-08-17
2016-08-17
2016-09-04
2016-09-04
2016-09-14
2016-09-09 00; 21C ; 22C ; 22MK ; 42MB
2016-08-24
2016-08-23
2016-09-03
2016-09-03
2016-09-13
2016-09-09 20URA
2016-08-24
2016-08-23
2016-09-03
2016-09-03
2016-09-13
2016-09-09 10URA
2016-08-24
2016-08-24
2016-09-03
2016-09-03
2016-09-13
2016-09-09 10URA; 20URA
2016-08-31
2016-08-31
2016-09-02
2016-09-02
2016-09-07
2016-09-09 00BZK
2016-08-31
2016-09-01
2016-09-01
2016-09-04
2016-09-06
2016-09-09 41SGC
2016-08-15
2016-08-17
2016-08-29
2016-08-29
2016-09-08
2016-09-17 00XKA; 31XKA
2016-08-08
2016-08-09
2016-08-30
2016-08-30
2016-09-09
2016-09-19 21MBR
2016-08-10
2016-08-05
2016-09-02
2016-09-03
2016-09-12
2016-09-19 11MBR; 12MBR
2016-08-24
2016-08-24
2016-09-10
2016-09-10
2016-09-20
2016-09-19 10URA; 21C ; 21MK ; 21MKC; 22MB ; 22MBJ; 22MKC; 32MKC
2016-08-10
2016-08-05
2016-09-02
2016-09-03
2016-09-12
2016-09-20 11MBR; 12MBR
2016-08-24
2016-08-24
2016-09-10
2016-09-10
2016-09-20
2016-09-20 10EKH; 10URA
2016-08-13
2016-08-13
2016-08-13
2016-08-14
2016-08-18
2016-09-21 42MBR
2016-08-31
2016-08-31
2016-09-02
2016-09-02
2016-09-07
2016-09-21 00C
2016-09-04
2016-09-06
2016-09-04
2016-09-06
2016-09-09
2016-09-21 00C ; 42MB
2016-09-05
2016-09-05
2016-09-05
2016-09-06
2016-09-10
2016-09-21 00ABA
2016-09-06
2016-09-06
2016-09-07
2016-09-07
2016-09-12
2016-09-21 00UEN
2016-09-08
2016-09-08
2016-09-09
2016-09-09
2016-09-14
2016-09-21 40EKH
2016-09-09
2016-09-09
2016-09-09
2016-09-09
2016-09-14
2016-09-21 22BAT
4350 Air
1
322,00
2 Denver
4381 Air
9
6998,00
4283 Sea
9
118000,00
1257 Ho Chi Minh Port
4317 Sea
78
951581,81
4739 Laem Chabang ALEXANDRIA
4298 Sea
164
199018,00
4368 Sea
14
31060,00
4342 Sea
2
20726,00
138 Shanghai
ALEXANDRIA
4382 Sea
6
31713,68
231 Hamburg
ALEXANDRIA
4370 Sea
14
17711,40
23 Hamburg
ALEXANDRIA
4341 Sea 3545 Sea 4376 Sea
19 37 13
32870,00 243,90 9676,90
234 Hamburg 1 Hamburg 70 Jebel Ali
ALEXANDRIA ALEXANDRIA DAMIETTA
4397 Sea
1
28575,35
77 Hamburg
ALEXANDRIA
4325 Sea 3517 Sea
139 32
210720,00 45904,00
1570 Hamburg 61 Antwerpen
ALEXANDRIA ALEXANDRIA
4369 Sea
2
37020,00
134 Hamburg
ALEXANDRIA
4351 Air 4430 Air
1 2
15,00 82,00
0 Frankfurt 0 Frankfurt
CAIRO CAIRO
4446 Air
11
2257,00
12 Frankfurt
CAIRO
4316 Sea
35
76810,00
301 Hamburg
ALEXANDRIA
4360 Sea
9
9805,00
52 Hamburg
ALEXANDRIA
4362 Sea
19
37245,10
88 Hamburg
ALEXANDRIA
4413 Air
1
138,00
4437 Air
2
1440,00
13 Düsseldorf
469 Shanghai
62 Izmir
CAIRO
CAIRO
ALEXANDRIA
ALEXANDRIA
ALEXANDRIA
1 Genua
CAIRO
5 Frankfurt
CAIRO
BA218/03 BA155/05 #12538999623 MS4541/06 MS541/07 #07796190113 UNION DEMETER #UD1606HCM ALX01 SCL BASILISK #LAEALE1 COSCO YANTIAN #YMLUM2313 64013 MSC JENNY #MSCUKG812 791 HANJIN TABUL #YMLUM2313 69342 RIO DE LA PLATA #SEJJSGL363 438 RIO DE LA PLATA #SGL361808 RIO BRAVO RIO BRAVO MAERSK EUPHRATES #957706453 RIO MADEIRA #SEJJSGL364 747 RIO BRAVO MSC SEATTLE #MSCUKG778 083 MSC SEATTLE #MSCURK046 002 LH584/16 MS6051/15 MS541/16 #07796190172 MS541/19 #07796190194 RIO DE LA PLATA #SEJJSGL352 186 + 5705 MSC CATERINA #MSCUKG818 244 MSC CATERINA #MSCUKG811 504 MS533/10 #07796006945 LH8290/13
2016-09-03
2016-09-02
2016-09-05
2016-09-07
2016-09-10
2016-09-21 41MB
2016-09-06
2016-09-06
2016-09-07
2016-09-07
2016-09-12
2016-09-21 00; 21C ; 22C
2016-06-08
2016-08-06
2016-09-02
2016-09-03
2016-12-09
2016-09-22 21MBR
2016-08-09
2016-08-09
2016-09-04
2016-09-04
2016-09-14
2016-09-22 11UHA
2016-08-10
2016-08-10
2016-09-09
2016-09-09
2016-09-19
2016-09-22 10URA; 20URA
2016-08-31
2016-08-31
2016-09-08
2016-09-10
2016-09-18
2016-09-22 30URA
2016-08-24
2016-08-24
2016-09-22
2016-09-17
2016-10-02
2016-09-24 11UHA; 21UHA
2016-08-31
2016-08-31
2016-09-10
2016-09-10
2016-09-20
2016-09-24 20URA
2016-08-31
2016-08-30
2016-09-10
2016-09-10
2016-09-20
2016-09-24 10URA
2016-08-10 2016-08-14 2016-09-05
2016-09-06
2016-09-23 2016-09-23 2016-09-15
2016-09-15
2016-09-25
2016-09-25 00ABA 2016-09-25 00ABA 2016-09-25 12MBR
2016-09-07
2016-09-07
2016-09-17
2016-09-17
2016-09-27
2016-09-25 00URA
2016-08-04 2016-08-27
2016-08-28
2016-09-22 2016-09-10
2016-09-10
2016-09-20
2016-09-26 00ABA 2016-09-26 31CYE; 32CYE; 41CYE; 42CYE
2016-08-28
2016-08-29
2016-09-10
2016-09-10
2016-09-20
2016-09-26 11UHA
2016-08-14 2016-09-15
2016-09-15
2016-08-25 2016-09-16
2016-09-16
2016-09-21
2016-09-27 00ABA 2016-09-27 00C ; 99UBA
2016-09-19
2016-09-19
2016-09-19
2016-09-19
2016-09-24
2016-09-27 00ABK
2016-08-31
2016-08-31
2016-09-10
2016-09-10
2016-09-20
2016-09-28 11MBR
2016-09-07
2016-09-07
2016-09-24
2016-09-25
2016-10-04
2016-09-28 22MBR
2016-09-07
2016-09-07
2016-09-24
2016-09-25
2016-10-04
2016-09-28 10MA ; 20MA ; 20MK ; 20URA; 21MK ; 31MKA
2016-09-10
2016-09-10
2016-09-10
2016-09-10
2016-09-15
2016-09-28 10URA
2016-09-13
2016-09-29
2016-09-28 00ABA
4429 Air
2
18,00
0 Frankfurt
CAIRO
2923 Air
1
222,00
2 Frankfurt
CAIRO
2924 Air
4
2168,00
9 Frankfurt
CAIRO
4435 Air
2
307,00
2 Frankfurt
CAIRO
4365 Sea
104
110186,00
804 Hamburg
4389 Sea 4407 Sea
18 2
11323,00 6600,00
4425 Air
1
59,00
0 Prag
CAIRO
4449 Air
2
8880,00
6 Prag
CAIRO
63 Hamburg 43 Antwerpen
ALEXANDRIA ALEXANDRIA ALEXANDRIA
4333 Sea
16
56640,00
4332 Sea
2
370000,00
4348 Sea
13
9681,60
4493 Air
2
329,20
2 Düsseldorf
CAIRO
4445 Air
1
686,00
2 Frankurt
CAIRO
4491 Air
1
502,00
4 Frankfurt
CAIRO
4379 Air
5
40,80
0 Frankfurt
CAIRO
4387 Sea
34
25424,68
103 Hamburg
ALEXANDRIA
4384 Sea
53
24142,60
113 Hamburg
ALEXANDRIA
4402 Sea
1
4533,31
38 Hamburg
ALEXANDRIA
4353 Sea
29
30010,64
82 Ho Chi Minh
ALEXANDRIA
2
644,00
4386 Air
211 Chennai
ALEXANDRIA
312 Rotterdam
BURULLUS
70 Jebel Ali
DAMIETTA
3 Denver
CAIRO
MS6051/15 MS541/16 #07796190161 KL8354/16 KL553/17 #07449772925 MS541/19 #07796190205 MS541/18 #07796190216 RIO DE LA PLATA RIO MADEIRA ADNAN N #012 – PS 4407 LH7431S/10 LH8290/11 #02053561255 MS541/23 #07792957222 MOZAMBIQUE # 957744753 CONSTANCE #CONST-ROTBUR-1 SAN FELIX #HLCUDX2160 808286 MS4541/30 MS541/02 #07796199585 MS6051/30 MS541/03 #07796199574 MS6051/17 MS541/02 #07796200915 KL8443/27 KL553/28 #07449772984 MSC ANTIGUA #MSCURK084 920 MSC ANTIGUA #MSCURK090 281 MSC ANTIGUA #MSCURK092 311 AEGEAN EXPRESS #SSPHHCM00 206979 BA218/06 BA155/08 #12535498724
2016-09-15
2016-09-15
2016-09-16
2016-09-16
2016-09-21
2016-09-28 21C ; 22C
2016-09-16
2016-09-16
2016-09-18
2016-09-18
2016-09-23
2016-09-28 00MB
2016-09-18
2016-09-18
2016-09-19
2016-09-19
2016-09-24
2016-09-28 00MB
2016-09-20
2016-09-20
2016-09-21
2016-09-21
2016-09-26
2016-09-28 00MB ; 41MK
2016-08-20
2016-09-19
2016-09-29 00ABA
2016-08-28 2016-09-09
2016-09-09
2016-09-24 2016-09-25
2016-09-24
2016-05-10
2016-10-01 00ABA 2016-10-02 21C ; 22C
2016-09-10
2016-09-10
2016-09-11
2016-09-11
2016-09-16
2016-10-05 42MB
2016-09-23
2016-09-23
2016-09-23
2016-09-23
2016-09-28
2016-10-05 11UHA
2016-09-05
2016-09-09
2016-09-28
2016-09-28
2016-10-08
2016-10-06 21BAT; 22BAT
2016-09-21
2016-09-22
2016-10-06
2016-10-07
2016-10-16
2016-10-07 21BAT; 22BAT
2016-09-02
2016-08-30
2016-09-30
2016-09-30
2016-10-10
2016-10-09 11MBR
2016-09-30
2016-09-30
2016-10-02
2016-10-02
2016-10-07
2016-10-09 11MBR
2016-09-30
2016-09-30
2016-10-03
2016-10-03
2016-10-08
2016-10-09 00
2016-10-01
2016-10-01
2016-10-02
2016-10-02
2016-10-07
2016-10-09 00C
2016-09-26
2016-09-27
2016-09-29
2016-09-29
2016-10-04
2016-10-09 00MB ; 00MK
2016-09-14
2016-09-14
2016-10-01
2016-10-02
2016-10-11
2016-09-14
2016-09-14
2016-10-01
2016-10-02
2016-10-11
2016-10-10 00MKC; 11MBA; 12MBA; 20MK ; 20MKA; 21BTA; 21MK ; 22BTA 2016-10-10 00EKH; 20MKA; 21MB ; 21UBA; 22MB ; 22UBA; 31UHA
2016-09-15
2016-09-14
2016-10-01
2016-10-02
2016-10-11
2016-10-10 20UBA
2016-08-30
2016-08-31
2016-09-29
2016-09-30
2016-10-09
2016-10-11 11MBR
2016-09-06
2016-09-06
2016-09-09
2016-09-09
2016-09-14
2016-10-14 21MB ; 22MB
4412 Air
1
283,00
31
255230,00
4415 Air
1
39,50
0 Frankfurt
3550 Sea
9
6309,00
12 Hamburg
ALEXANDRIA
4418 Sea
6
31869,80
231 Hamburg
ALEXANDRIA
4400 Sea
3
60373,00
207 Hamburg
ALEXANDRIA
3544 Sea
2
7280,00
21 Yilport
ALEXANDRIA
4468 Air
20
30577,95
56 Leipzig
CAIRO
4471 Air
3
45,00
0 Frankfurt
CAIRO
3554 Air
11
126,64
1 Frankfurt
CAIRO
4502 Air
1
31,00
0 Frankfurt
CAIRO
3552 Air
5
97,00
1 Frankfurt
CAIRO
4507 Air
2
3732,00
4479 Air
6
373,40
3543 Sea
32
4426 Sea
4377 Sea
2 Frankfurt
4321 Jebel Ali
19 Istanbul
CAIRO
DAMIETTA CAIRO
CAIRO
2 Düsseldorf
CAIRO
3514,64
7 Hamburg
ALEXANDRIA
420
147543,20
1264 Hamburg
ALEXANDRIA
4374 Air
2
644,00
3 Denver
CAIRO
4452 Air
3
104,00
1 Frankfurt
CAIRO
4406 Sea
161
195469,50
458 Shanghai
ALEXANDRIA
4396 Sea
10
145579,00
708 Shanghai
ALEXANDRIA
4393 Sea
4
58599,00
303 Shanghai
ALEXANDRIA
4403 Sea
65
96063,00
691 Hamburg
ALEXANDRIA
MS6051/08 MS541/09 #07796190135 PANTANAL #JEBDAM01 MS6051/15 MS541/16 #07796190183 MSC SILVIA #MSCURK102 433 MSC SILVIA #MSCUKG865 799 MSC ANTIGUA #MSCUKG853 100 MSC JENNY #MSCUKG970 839 MS4541/28 MS541/30 #07796199401 KL8350/01 KL553/03 #07449773006 KL8840/28 KL553/01 #07449772995 MS798/07 #07792595775 KL8440 / LK553 #07449772973 MS543 #07732472391 MS4541/07 MS541/09 #07796200930 MSC ANTIGUA #MSCURK096 817 MSC SILVIA #MSCUKG868 058 BA218/31 BA155/02 #12535496871 KL8350/30 KL553/03 #07449773021 COSCO ASIA # COSCO ASIA #YMLUM2313 76580 COSCO ASIA #YMLUM2313 76575 RIO BRAVO
2016-09-08
2016-09-08
2016-09-09
2016-09-09
2016-09-14
2016-10-14 00C
2016-09-12
2016-09-20
2016-10-01
2016-09-30
2016-10-11
2016-10-14 12MBR
2016-09-15
2016-09-15
2016-09-16
2016-09-16
2016-09-21
2016-10-14 00BZK
2016-09-21
2016-09-21
2016-10-09
2016-10-09
2016-10-19
2016-10-14 30URA
2016-09-21
2016-09-21
2016-10-08
2016-10-09
2016-10-18
2016-10-14 30URA
2016-09-21
2016-09-21
2016-10-08
2016-10-09
2016-10-18
2016-10-14 11UHA
2016-09-24
2016-09-25
2016-10-08
2016-10-08
2016-10-18
2016-10-14 41SGJ
2016-09-28
2016-09-28
2016-09-30
2016-09-30
2016-10-05
2016-10-14 00C ; 00EKH; 21MB ; 22MB ; 42MB
2016-10-05
2016-10-05
2016-10-06
2016-10-06
2016-10-11
2016-10-14 20C
2016-10-05
2016-10-05
2016-10-09
2016-10-09
2016-10-14
2016-10-14 10MKA; 41MK
2016-10-07
2016-10-07
2016-10-07
2016-10-07
2016-10-12
2016-10-14 22BAT
2016-10-07
2016-10-07
2016-10-09
2016-10-09
2016-10-14
2016-10-14 21MBR; 22MBR; 99UBA
2016-10-08
2016-10-08
2016-10-09
2016-10-09
2016-10-14
2016-10-14 41SGA
2016-10-11
2016-10-11
2016-10-11
2016-10-11
2016-10-16
2016-10-14 00BZK; 10MA ; 12MBR; 41SGY; 42MB
2016-09-14
2016-09-14
2016-10-01
2016-10-02
2016-10-11
2016-10-16 20MK ; 21BTA; 21MK ; 22BTA
2016-09-21
2016-09-21
2016-10-08
2016-10-09
2016-10-18
2016-10-16 00
2016-08-31
2016-09-01
2016-09-02
2016-09-02
2016-09-07
2016-10-18 31MB ; 32MB
2016-09-30
2016-10-01
2016-10-04
2016-10-04
2016-10-09
2016-10-18 00C ; 00MK
2016-09-13
2016-09-13
2016-10-13
2016-10-09
2016-10-23
2016-10-19 20URA; 30URA
2016-09-14
2016-09-13
2016-10-13
2016-10-09
2016-10-23
2016-10-19 11UHA; 21UHA
2016-09-14
2016-09-13
2016-10-13
2016-10-09
2016-10-23
2016-10-19 11UHA; 21UHA
2016-09-21
2016-09-21
2016-10-03
2016-10-19 00ABA
4511 Air
2
149,00
2 Frankfurt
CAIRO
MS6051/07 MS541/09 #07796201055 MS541/07 #07796201044 AF341M/13 AF6752/15 #05752956083 KL8440/13 KL553/14 #07449773043 KL8350/14 KL553/15 #07449773032 KL8350/14 KL553/15 #07449773065 MS798/15 #07792595860 PANTANAL #MUMDAM001 GUNDE MAERSK # RIO BRAVO RIO BRAVO RIO BLANCO #SGL356725 MS913/29 #07796137871 LH7119/15 LH8290/16 #02052165842 LH1397/15 LH8290/16 #02053561546 MSC SILVIA #MSCURK027 721 RIO BLANCO #SGL371142 RIO BLANCO #SGL370783 ABB VANESSA #LAE-ALE-002
2016-10-08
2016-10-11
2016-10-11
2016-10-11
2016-10-16
2016-10-19 00
4485 Air
2
8804,00
5 Düsseldorf
CAIRO
2016-10-12
2016-10-12
2016-10-12
2016-10-12
2016-10-17
2016-10-19 21UHA
4501 Air
5
2005,36
15 Frankfurt
CAIRO
2016-10-13
2016-10-13
2016-10-16
2016-10-16
2016-10-21
2016-10-19 00C ; 00EKH; 22MBR; 32MB
4513 Air
1
344,00
1 Frankfurt
CAIRO
2016-10-13
2016-10-13
2016-10-16
2016-10-16
2016-10-21
2016-10-19 99UBA
4520 Air
2
820,00
2 Hamburg
CAIRO
2016-10-14
2016-10-14
2016-10-16
2016-10-16
2016-10-21
2016-10-19 10URA
4492 Air
4
49,00
0 Frankfurt
CAIRO
2016-10-14
2016-10-14
2016-10-16
2016-10-16
2016-10-21
2016-10-19 00C
4519 Air
1
33,00
0 Wien
CAIRO
2016-10-15
2016-10-16
2016-10-15
2016-10-16
2016-10-20
2016-10-19 00UEN
4346 Sea
65
219592,27
581 Mumbai
DAMIETTA
4401 Sea
6
57324,00
467 Shanghai
ALEXANDRIA
2016-08-30
2016-09-04
2016-10-01
2016-09-30
2016-10-11
2016-10-20 30URA
2016-09-13
2016-09-13
2016-10-13
2016-10-12
2016-10-23
2016-10-20 11UHA; 21UHA
3551 Sea 4428 Sea 4334 Sea
12 56 47
74,30 99019,00 73140,00
0 Hamburg 849 Hamburg 391 Hamburg
ALEXANDRIA ALEXANDRIA ALEXANDRIA
2016-09-21 2016-09-21 2016-09-28
2016-09-28
2016-10-18 2016-10-18 2016-10-08
2016-10-08
2016-10-18
2016-10-20 00ABA 2016-10-20 00ABA 2016-10-20 21BAT; 22BAT
4480 Air
1
90,00
2016-09-29
2016-09-29
2016-09-29
2016-09-29
2016-10-04
2016-10-20 21MBR
4522 Air
2
2527,00
2016-10-15
2016-10-15
2016-10-16
2016-10-16
2016-10-21
2016-10-20 42MBR
4526 Air
1
163,00
2016-10-15
2016-10-15
2016-10-16
2016-10-16
2016-10-21
2016-10-20 41MB
4363 Sea
2
34074,28
193 Hamburg
ALEXANDRIA
2016-09-21
2016-09-21
2016-10-08
2016-10-09
2016-10-18
2016-10-21 21UBA; 22UBA
4335 Sea
6
127952,04
230 Hamburg
ALEXANDRIA
4431 Sea
37
49499,68
110 Hamburg
ALEXANDRIA
2016-09-28
2016-09-28
2016-10-08
2016-10-08
2016-10-18
2016-10-21 21BAT; 22BAT
2016-09-28
2016-09-28
2016-10-08
2016-10-08
2016-10-18
2016-09-12
2016-09-12
2016-10-09
2016-10-09
2016-10-19
2016-10-21 00C ; 10URA; 20URA; 21MB ; 22MB ; 30URA 2016-10-22 11MBR
4409 Sea
6
38410,00
259 Laem Chabang ALEXANDRIA
4395 Sea
9
72097,16
571 Laem Chabang ALEXANDRIA
ABB VANESSA #LAE-ALE-001
2016-09-14
2016-09-12
2016-10-12
2016-10-09
2016-10-22
2016-10-22 21UHA
4458 Sea
258
87629,00
776 Hamburg
ALEXANDRIA
2016-09-28
2016-09-28
2016-10-16
2016-10-16
2016-10-26
2016-10-22 00
2
3437,00
15 Hamburg
ALEXANDRIA
2016-09-28
2016-09-28
2016-10-16
2016-10-16
2016-10-26
2016-10-22 12MBR
4459 Sea
168
61070,40
506 Hamburg
ALEXANDRIA
2016-09-28
2016-09-28
2016-10-16
2016-10-16
2016-10-26
2016-10-22 00
4349 Sea
31
255230,00
4321 Hamriyah
MSC SINDY #MSCUKG923 085 MSC SINDY #MSCURK098 748 MSC SINDY #MSCUKG922 822 ESBJERG #HAMDMT092 016-001
4405 Sea
2016-09-24
2016-09-24
2016-10-09
2016-10-08
2016-10-19
2016-10-23 11MBR
0 Dubai
CAIRO
2 Düsseldorf
CAIRO
0 Prag
CAIRO
DAMIETTA
4438 Sea
8
8897,00
50 Hamburg
ALEXANDRIA
115 Antwerpen
ALEXANDRIA
4447 Sea
2
15150,00
4448 Sea
23
184527,00
1952 Hamburg
ALEXANDRIA
4444 Sea
3
34166,20
228 Hamburg
ALEXANDRIA
4518 Air
2
787,00
7 Frankfurt
4433 Sea
1
10380,00
69 Shanghai
ALEXANDRIA
4390 Sea
2
12400,00
103 Antwerpen
ALEXANDRIA
4443 Sea
20
55050,00
429 Antwerpen
BURULLUS
4372 Sea 4527 Air
5 6
27600,00 404,98
245 Antwerpen 3 Frankfurt
ALEXANDRIA CAIRO
3556 Air
3
50,90
4391 Sea
4
64000,00
402 Antwerpen
ALEXANDRIA
4380 Sea
7
28000,00
248 Antwerpen
ALEXANDRIA
4525 Air
1
2200,00
4538 Air
2
4521 Air
0 Frankfurt
CAIRO
CAIRO
MSC SINDY #MSCUKG913 623 VERA ROSE #002 MSC SINDY #MSCUKG901 016 MSC SINDY #MSCUKG896 828 KL8384/14 MP8910/17 #07449773054 COSCO AMERICA # VERA ROSE #003 VERA ROSE #006 VERA ROSE # KL8440/18 MP8910/24 #07449773080 KL8440/18 MP8140/20 #07449773102 VERA ROSE #004 VERA ROSE #005 KL8580/20 MP8910/24 #07448672175 MS4541/21 MS541/23 #07790445600 EK0110/21 EK0927/24 #17632545763 GRANDWAY STAR #SHALGS1606 01 RIO MADEIRA CSCL SUMMER #YMLUM2313 80537
2016-09-28
2016-09-28
2016-10-16
2016-10-16
2016-10-26
2016-10-23 21MBR
2016-09-27
2016-09-28
2016-10-11
2016-10-11
2016-10-21
2016-10-24 21MBL; 22MBL
2016-09-28
2016-09-28
2016-10-16
2016-10-16
2016-10-26
2016-10-24 21MBL; 22MBL
2016-09-28
2016-09-28
2016-10-16
2016-10-16
2016-10-26
2016-10-24 01LD ; 02LD ; 10LD ; 20LD ; 30LD ; 40LD
2016-10-14
2016-10-14
2016-10-18
2016-10-17
2016-10-23
2016-10-24 99UBA
2016-09-21
2016-09-21
2016-10-20
2016-10-18
2016-10-30
2016-10-25 12UHA
2016-09-27
2016-09-28
2016-10-10
2016-10-11
2016-10-20
2016-10-25 21MBR; 22MBR
2016-09-27
2016-09-27
2016-10-11
2016-10-11
2016-10-21
2016-10-25 21MB ; 22MB
2016-09-27 2016-10-18
2016-09-28 2016-10-18
2016-10-11 2016-10-24
2016-10-11 2016-10-21
2016-10-21 2016-10-29
2016-10-25 21MB 2016-10-26 00EKH; 41MB ; 42MB
2016-10-18
2016-10-18
2016-10-20
2016-10-21
2016-10-25
2016-10-26 00ABK; 00C ; 00URA
2016-09-27
2016-09-27
2016-10-11
2016-10-11
2016-10-21
2016-10-27 21MB ; 22MB
2016-09-27
2016-09-28
2016-10-11
2016-10-11
2016-10-21
2016-10-27 21MB ; 22MB
2016-10-20
2016-10-20
2016-10-24
2016-10-24
2016-10-29
2016-10-29 21BAT
2016-10-21
2016-10-21
2016-10-25
2016-10-24
2016-10-30
2016-10-29 00; 32MB
2016-10-21
2016-10-21
2016-10-24
2016-10-24
2016-10-29
2016-10-29 32MKA
2016-08-29
2016-08-29
2016-10-18
2016-10-18
2016-10-28
2016-10-30 11UHA
2016-08-30 2016-09-28
2016-09-28
2016-09-26 2016-10-25
2016-10-24
2016-11-04
2016-10-30 00ABA 2016-10-30 21MBL; 22MBL
7 Wien
CAIRO
66,04
0 Frankfurt
CAIRO
1
15,00
0 Charlotte
CAIRO
4331 Sea
5
85643,10
344 Shanghai
ALEXANDRIA
3548 Sea 4441 Sea
30 4
31772,00 1586,00
36 Hamburg 20 Shanghai
ALEXANDRIA ALEXANDRIA
4450 Sea
3
28468,00
227 Shanghai
ALEXANDRIA
CSCL SUMMER #YMLUM2313 80091
2016-09-28
2016-09-28
2016-10-25
2016-10-24
2016-11-04
2016-10-30 12UHA
4398 Sea
35
76810,00
301 Hamburg
ALEXANDRIA
2016-09-28
2016-10-05
2016-10-23
2016-10-23
2016-11-02
2016-10-30 12MBR
4436 Sea
5
72979,30
354 Shanghai
ALEXANDRIA
MSC AGADIR #MSCUKG874 908 CSCL SUMMER #YMLUM2313 79683
2016-09-28
2016-09-28
2016-10-25
2016-10-24
2016-11-04
2016-10-30 12UHA
4462 Sea
2
23141,00
151 Shanghai
ALEXANDRIA
CSCL SUMMER #YUMLM2313 80090
2016-09-28
2016-09-28
2016-10-25
2016-10-24
2016-11-04
2016-10-30 12UHA
3553 Sea
2
1016,00
3 Hamburg
ALEXANDRIA
4451 Sea
33
35228,88
121 Hamburg
ALEXANDRIA
4460 Sea
82
29150,00
247 Hamburg
ALEXANDRIA
4469 Sea
92
22713,00
251 Hamburg
ALEXANDRIA
4457 Sea
92
22713,00
251 Hamburg
ALEXANDRIA
4483 Sea
4
63200,00
89 Hamburg
ALEXANDRIA
4472 Sea
1
13593,00
67 Hamburg
ALEXANDRIA
4375 Sea
8
140941,11
772 Hamburg
ALEXANDRIA
4345 Sea
9
118000,00
Sea Sea Sea Sea
1 5 1 99
3,25 2,61 456500,00 1165474,38
4417 Sea
9
5557,32
4478 Sea
1
10150,00
86 Hamburg
ALEXANDRIA
4499 Sea
23
64119,00
179 Hamburg
ALEXANDRIA
4399 Sea 4508 Sea
1 36
395200,00 35574,97
240 Blexen 103 Yilport
BURULLUS ALEXANDRIA
2921 Sea 4482 Sea
1 18
2,55 121328,72
4490 Sea 4512 Air
1 1
395000,00 180,00
2928 Sea 2931 Air
1 1
2,55 72,00
0 Blexen 0 Frankfurt
ALEXANDRIA CAIRO
4543 Air
2
362,90
3 Frankfurt
CAIRO
4546 Air
4
280,18
1 Frankfurt
CAIRO
4558 Air
2
6250,00
43 Frankfurt
CAIRO
37
44910,64
2927 2926 4506 4385
4411 Sea
1257 Ho Chi Minh Port 0 Blexen 0 Blexen 441 Blexen 6234 Laem Chabang
ALEXANDRIA ALEXANDRIA ALEXANDRIA BURULLUS ALEXANDRIA
34 Laem Chabang ALEXANDRIA
0 Blexen 1034 Hamburg 240 Blexen 1 Milano
130 Ho Chi Minh Port
ALEXANDRIA ALEXANDRIA ALEXANDRIA CAIRO
ALEXANDRIA
MSC AGADIR #MSCUKG952 399 MSC AGADIR #MSCUKG940 139 MSC AGADIR #MSCUKG940 733 MSC AGADIR #MSCUKG940 790 MSC AGADIR #MSCUKG923 044 MSC AGADIR #MSCURK118 298 MSC MELISSA #MSCUKG946 235 MSC SINDY + MSC AGADIR #MSCURK070 242 AERO STAR #ASFW1601 ROCHEFORT # ROCHEFORT # ROCHEFORT # THORCO ARCTIC #LCBALE1 MSC LEVINA #MSCUW7035 527 MSC PINA #MSCUKG989 227 MSC PINA #MSCURK142 744 ROCHEFORT # MSC JENNY #MSCURK134 451 ROCHEFORT # MSC PINA #MSCUKG974 872 ROCHEFORT # MS533 #07796011031 ROCHEFORT # EY008/25 EY 657/26 #60770091696 KL8350/25 KL553/26 #07449773113 KL8440/27 KL553/29 #07449773124 LH8290/30 #02052165901 YM IMAGE #
2016-10-05
2016-10-05
2016-10-23
2016-10-23
2016-11-02
2016-10-30 21MBL; 22MBL
2016-10-05
2016-10-05
2016-10-23
2016-10-23
2016-11-02
2016-10-05
2016-10-05
2016-10-23
2016-10-23
2016-11-02
2016-10-30 00C ; 10MA ; 10MKA; 20MKA; 21BFT; 21C ; 21MB ; 22BFT; 22BJT; 22C ; 22MB 2016-10-30 00
2016-10-05
2016-10-05
2016-10-23
2016-10-23
2016-11-02
2016-10-30 00
2016-10-05
2016-10-05
2016-10-23
2016-10-23
2016-11-02
2016-10-30 00
2016-10-05
2016-10-05
2016-10-23
2016-10-23
2016-11-02
2016-10-30 21MB ; 22MB
2016-10-10
2016-10-10
2016-10-23
2016-10-23
2016-11-02
2016-10-30 11UHA
2016-09-28
2016-09-28
2016-10-16
2016-10-16
2016-10-26
2016-10-30 21UBA; 22UBA
2016-09-29
2016-09-28
2016-10-19
2016-10-19
2016-10-29
2016-10-30 11MBR
2016-10-15 2016-10-15 2016-10-15 2016-09-16
2016-10-14 2016-10-14 2016-10-14 2016-09-17
2016-10-30 2016-10-30 2016-10-29 2016-10-14
2016-10-30 2016-10-30 2016-10-29 2016-10-10
2016-11-09 2016-11-09 2016-11-08 2016-10-24
2016-10-30 2016-10-30 2016-10-30 2016-10-31
2016-09-13
2016-09-13
2016-10-29
2016-10-29
2016-11-08
2016-11-01 11MBR
2016-10-12
2016-10-12
2016-10-29
2016-10-29
2016-11-08
2016-11-01 00URA
2016-10-12
2016-10-12
2016-10-29
2016-10-29
2016-11-08
2016-11-01 22MPB
2016-10-15 2016-10-12
2016-10-14 2016-10-16
2016-10-30 2016-10-29
2016-10-30 2016-10-29
2016-11-09 2016-11-08
2016-11-01 21MK 2016-11-01 11SGA; 11SGC; 21SGA; 21SGC; 31SGA
2016-10-15 2016-10-12
2016-10-14 2016-10-12
2016-10-30 2016-10-29
2016-10-30 2016-10-29
2016-11-09 2016-11-08
2016-11-01 21MK 2016-11-02 11UHA; 40URA
2016-10-15 2016-10-09
2016-10-14 2016-10-10
2016-10-30 2016-10-09
2016-10-30 2016-10-09
2016-11-09 2016-10-14
2016-11-02 10MKA 2016-11-02 00URA
2016-10-15 2016-10-25
2016-10-14 2016-10-25
2016-10-30 2016-10-26
2016-10-30 2016-10-28
2016-11-09 2016-10-31
2016-11-02 10MKA 2016-11-02 00MK
2016-10-25
2016-10-25
2016-10-26
2016-10-27
2016-10-31
2016-11-02 42MB
2016-10-27
2016-10-27
2016-10-29
2016-10-30
2016-11-03
2016-11-02 11MBR; 41MK ; 42MB
2016-10-30
2016-10-30
2016-10-30
2016-10-30
2016-11-04
2016-11-02 10EKH; 20EKH
2016-09-27
2016-09-27
2016-10-20
2016-10-18
2016-10-30
2016-11-03 12MBR
21MB 21MB 21MB 11UHA; 21UHA
4539 Air
7
478,70
2 Düsseldorf
CAIRO
4568 Air
1
24,00
0 Frankfurt
CAIRO
4559 Air
2
269,00
2 Frankfurt
CAIRO
4574 Air
2
2710,00
4 Frankfurt
CAIRO
2932 Air
1
136,00
1 Frankfurt
CAIRO
4481 Sea
14
29980,00
4534 Sea 2930 Sea 4422 Sea
1 6 14
451255,00 7,39 24569,00
4465 Sea
59
4421 Sea
59 Izmir
ALEXANDRIA
KL8440/28 MP8910/31 #07449773161 KL8440/28 KL0553/29 #07449773146 KL8360/28 KL0553/29 #07449773135 KL8440/28 KL553/29 #07449773150 KL8350/29 MP8910/31 #07449773172 MSC JENNY #MSCUKG981 984 HOHE BANK # HOHE BANK # CSCL SUMMER #INMUM0000 000111
2016-10-28
2016-10-28
2016-10-31
2016-10-31
2016-11-05
2016-11-03 22MK ; 30EKH; 32C ; 32MKA; 42BAB; 42MKA; 99UBA
2016-10-28
2016-10-28
2016-11-01
2016-11-01
2016-11-06
2016-11-03 42MBR
2016-10-28
2016-10-28
2016-11-01
2016-11-01
2016-11-06
2016-11-03 00
2016-10-28
2016-10-28
2016-10-29
2016-10-30
2016-11-03
2016-11-03 42MBR
2016-10-29
2016-10-29
2016-10-31
2016-10-31
2016-11-05
2016-11-03 00MB
2016-10-15
2016-10-19
2016-10-29
2016-10-29
2016-11-08
2016-11-06 40URA
2016-10-20 2016-10-20 2016-09-30
2016-10-20 2016-10-20 2016-09-30
2016-11-06 2016-11-06 2016-11-03
2016-11-06 2016-11-06 2016-11-04
2016-11-16 2016-11-16 2016-11-13
2016-11-06 22MB 2016-11-06 22MB 2016-11-07 20URA
2016-11-07 00; 10LBG; 10MKA; 10PGB; 11MB ; 20C ; 21C ; 21MB ; 21MK ; 22C ; 22MB ; 30URA; 40URA 2016-11-07 10MKA; 20MKA; 21MBV; 21MPR; 22MPR
441 Blexen 0 Blexen 222 Mumbai
BURULLUS ALEXANDRIA ALEXANDRIA
21677,97
124 Hamburg
ALEXANDRIA
MSC PINA #MSCUKG975 564
2016-10-12
2016-10-12
2016-10-29
2016-10-29
2016-11-08
30
93110,00
604 Hamburg
ALEXANDRIA
2016-10-12
2016-10-12
2016-10-29
2016-10-29
2016-11-08
4371 Sea
25
87648,00
130 Shanghai
ALEXANDRIA
2016-09-12
2016-09-17
2016-10-29
2016-10-29
2016-11-08
2016-11-07 21BBT; 22BBT
2922 Sea 4322 Sea 4440 Sea
1 1 2
2,55 395200,00 36821,32
0 Blexen 240 Blexen 159 Shanghai
BURULLUS BURULLUS ALEXANDRIA
MSC PINA #MSCUKG938 984 NIKATOR #NK1601SHAL X02 HOHE BANK # HOHE BANK # CSCL AUTUMN #YMLUM2313 83410
2016-10-20 2016-10-20 2016-10-05
2016-10-20 2016-10-20 2016-10-05
2016-11-03 2016-11-03 2016-11-03
2016-11-06 2016-11-06 2016-11-04
2016-11-13 2016-11-13 2016-11-13
2016-11-07 22MK 2016-11-07 22MK 2016-11-08 21MBL; 22MBL
4484 Sea
24
15005,04
53 Hamburg
ALEXANDRIA
2016-10-19
2016-10-19
2016-11-07
2016-11-07
2016-11-17
2016-11-09 10; 10MKA; 11; 12; 21BAB; 21MB ; 22BAB; 22MB
3546 Sea
1
270,00
1 Shanghai
ALEXANDRIA
2016-09-27
2016-09-27
2016-11-02
2016-11-02
2016-11-12
2016-11-09 21BBT
4514 Sea
4
27100,00
231 Hamburg
ALEXANDRIA
2016-10-19
2016-10-19
2016-11-07
2016-11-07
2016-11-17
2016-11-09 21MB ; 22MB
4495 Air
2
336,00
2016-10-19
2016-10-20
2016-10-27
2016-10-27
2016-11-01
2016-11-10 00ABA
4600 Air
1
2016-11-05
2016-11-05
2016-11-06
2016-11-06
2016-11-11
2016-11-10 99UBA
4578 Air
2016-11-03
2016-11-03
2016-11-05
2016-11-05
2016-11-10
2016-11-10 00UEN
4563 Air
MSC ELENI #MSCURK135 482 GJERTRUD MAERSK #MSCUYD548 452 MSC ELENI #MSCURK160 894 EK9542/18 EK9992/20 EK9 #17632545645 MS1584 MS541 #07712344555 KL8440/03 KL553/04 #07449773183 MS4541/26 MS541/30 #07790872283
2016-10-26
2016-10-26
2016-10-30
2016-10-30
2016-11-04
2016-11-10 00UEN
3 Miami
CAIRO
11,05
0 Frankfurt
CAIRO
1
160,00
0 Frankfurt
CAIRO
1
380,00
0 Frankfurt
CAIRO
4515 Sea
1
8800,00
67 Rotterdam
4420 Sea
12
22342,00
4602 Air
1
302,60
0 Frankfurt
CAIRO
4576 Air
7
1740,39
7 Frankfurt
CAIRO
4503 Sea
21
20588,89
46 Hamburg
ALEXANDRIA
4361 Sea
6
26335,00
29 Ulsan
BURULLUS
4467 Sea
6
19000,00
153 Hamburg
ALEXANDRIA
4473 Sea
4
3802,00
13 Hamburg
ALEXANDRIA
4461 Sea
428
144936,80
1288 Hamburg
ALEXANDRIA
4463 Sea
8
44310,00
187 Antwerpen
ALEXANDRIA
4392 Sea
20
130996,00
1401 Antwerpen
ALEXANDRIA
4486 Sea
10
30653,58
126 Antwerpen
ALEXANDRIA
4504 Sea
23
64119,00
179 Hamburg
ALEXANDRIA
4470 Sea
4
39871,02
308 Abu Dhabi
DAMIETTA
4442 Sea
2
510,00
2 Shanghai
ALEXANDRIA
4500 Sea
12
119894,00
919 Hamburg
ALEXANDRIA
4432 Sea
2
34068,00
333 Antwerpen
BURULLUS
4587 Air
1
408,00
1 Shanghai
CAIRO
4608 Air
1
187,20
1 Istanbul
CAIRO
4616 Air
1
25,50
0 Ho Chi Minh
CAIRO
4505 Sea
4
32580,00
213 Hamburg
ALEXANDRIA
4553 Sea
4
5694,00
13 Hamburg
ALEXANDRIA
4455 Sea
20
13684,00
60 Hamburg
ALEXANDRIA
4454 Sea
97
39416,00
758 Hamburg
ALEXANDRIA
478 Mumbai
ALEXANDRIA
ALEXANDRIA
MSC FLAMINIA #MSCURK190 974 MAERSK DANUBE #769291887 KL8440 MP8910 #07449773216 KL8440 MP8910 #07449773194 MSC ELENI #MSCURK177 310 DA ZI YUN #ULS-ALX 002
2016-10-24
2016-10-24
2016-11-07
2016-11-07
2016-11-17
2016-11-11 11UHA
2016-10-13
2016-10-12
2016-11-05
2016-11-05
2016-11-15
2016-11-13 30URA; 40URA
2016-11-04
2016-11-04
2016-11-07
2016-11-07
2016-11-12
2016-11-13 42MBR
2016-11-04
2016-11-04
2016-11-07
2016-11-08
2016-11-12
2016-11-13 00C ; 21MB ; 41MB ; 42C ; 99UBA
2016-10-19
2016-10-19
2016-11-07
2016-11-07
2016-11-17
2016-11-13 21MB ; 22MB
2016-09-19
2016-09-19
2016-11-05
2016-11-05
2016-11-15
2016-11-13 11UHA
MSC ELENI #MSCURK161 389 MSC ELENI #MSCURK177 047 MSC ELENI #MSCUKG936 301 VECHTDIEP #010 VECHTDIEP #009 VECHTDIEP #012 MSC ELENI #MSCURK143 478 THORSTAR #HLCUDX2160 906870 CSCL AUTUMN #YMLUM2313 80536
2016-10-19
2016-10-19
2016-11-07
2016-11-07
2016-11-17
2016-11-14 11UHA
2016-10-19
2016-10-19
2016-11-07
2016-11-07
2016-11-17
2016-11-14 11; 12
2016-10-19
2016-10-19
2016-11-07
2016-11-07
2016-11-17
2016-11-14 00
2016-10-24
2016-10-21
2016-11-02
2016-11-02
2016-11-12
2016-11-14 00UEN
2016-10-24
2016-10-21
2016-11-02
2016-11-02
2016-11-12
2016-11-14 21MBV; 21MPR; 22MBV; 22MPR
2016-10-24
2016-10-21
2016-11-02
2016-11-02
2016-11-12
2016-11-14 00
2016-10-19
2016-10-19
2016-11-07
2016-11-07
2016-11-17
2016-11-14 21MPB
2016-10-04
2016-10-04
2016-11-09
2016-11-09
2016-11-19
2016-11-15 21MB ; 22MB
2016-10-05
2016-10-05
2016-11-04
2016-11-04
2016-11-14
2016-11-15 21MBL; 22MBL
MSC ELENI #MSCURK161 272 VECHTDIEP #011 EK9873/04 EK0923/05 #17632884574 MS543/05 #07792473872 EK0393/10 EK0927/12 #17630858925 MSC ELENI #MSCURK160 597 MSC CAROLE #MSCURK223 585 MSC CAROLE #MSCUKG935 873 RIO BRAVO #SGL372658
2016-10-19
2016-10-19
2016-11-07
2016-11-07
2016-11-17
2016-11-15 21MPB; 22MPB
2016-10-24
2016-10-21
2016-11-02
2016-11-02
2016-11-12
2016-11-15 21MBR; 22MBR
2016-11-04
2016-11-04
2016-11-05
2016-11-05
2016-11-10
2016-11-15 11UHA
2016-11-05
2016-11-05
2016-11-05
2016-11-05
2016-11-10
2016-11-15 30SGC
2016-11-10
2016-11-10
2016-11-12
2016-11-12
2016-11-17
2016-11-15 11MBR
2016-10-19
2016-10-19
2016-11-07
2016-11-07
2016-11-17
2016-11-15 10LD ; 20LD ; 30LD ; 40LD
2016-10-26
2016-10-26
2016-11-12
2016-11-12
2016-11-22
2016-11-15 21CYE; 22CYE
2016-10-26
2016-10-26
2016-11-12
2016-11-12
2016-11-22
2016-11-16 22BAA
2016-10-26
2016-10-26
2016-11-05
2016-11-05
2016-11-15
2016-11-16 21BAA; 22BAA
4592 Air
2
2700,00
2 Frankfurt
4582 Air
22
29369,00
173 Jebel Ali Port
CAIRO
4535 Sea
3
29980,00
209 Hamburg
ALEXANDRIA
4544 Sea
4
14164,00
31 Hamburg
ALEXANDRIA
3558 Sea
4
1885,00
4358 Sea
24
3086000,00
4510 Sea
42
65155,26
4561 Sea
1
20493,00
4552 Sea
2
13960,00
151 Hamburg
ALEXANDRIA
3555 Sea
4
243,20
1 Hamburg
ALEXANDRIA
4541 Sea
10
9457,00
52 Jebel Ali
4366 Sea
12
22782,00
477 Mumbai
4464 Sea
6
7320,00
6 Shanghai
ALEXANDRIA
4596 Air
1
8,00
0 Frankfurt
CAIRO
4595 Air
12
3444,53
10 Frankfurt
CAIRO
4625 Air
1
31,50
0 Frankfurt
CAIRO
4617 Air
2
1074,00
3 Frankfurt
CAIRO
4637 Air
1
10,50
0 Düsseldorf
CAIRO
4618 Air
1
663,00
1 Genua
CAIRO
4629 Air
2
3191,80
2 Düsseldorf
CAIRO
4642 Air
1
69,60
0 Dubai
CAIRO
4 Antwerpen
6607 Ulsan 193 Hamburg 67 Rotterdam
CAIRO
ALEXANDRIA
BURULLUS ALEXANDRIA ALEXANDRIA
DAMIETTA ALEXANDRIA
KL8440/09 KL553/10 #07449773220 EK9735 #17634306893 MSC CAROLE #MSCURK201 276 MSC CAROLE #MSCURK226 687 E.R. LONG BEACH #MSCURK241 009 DA ZI YUN #ULS-ALX001 MSC CAROLE #MSCURK240 548 E. R. LONG BEACH #MSCURK234 046 RIO BLANCO #SGL386952 MSC ELENI #MSCUKG961 895 MAERSK EUPHRATES #958320177 MAERSK DANUBE #958057435 CSCL SPRING #YMLUM2313 84977 MS9537T/09 MS541/11 #07792596302 KL8440/11 MP8910/14 #07449773231 MS1520/15 MS541/16 #07790881195 KL8290/09 KL553/11 #07449773242 MS1520/15 MS541/16 #07790881206 KL553/17 #07449682765 KL8440/17 KL553/18 #07449773253 QR1015/18 QR1301/18 #15701575383
2016-11-09
2016-11-09
2016-11-11
2016-11-11
2016-11-16
2016-11-16 32MBR
2016-11-10
2016-11-10
2016-11-10
2016-11-10
2016-11-15
2016-11-16 41MBR
2016-10-26
2016-10-26
2016-11-12
2016-11-12
2016-11-22
2016-11-17 00ABK
2016-10-26
2016-10-26
2016-11-12
2016-11-12
2016-11-22
2016-11-17 00
2016-10-30
2016-10-30
2016-11-13
2016-11-12
2016-11-22
2016-11-17 00C
2016-09-19
2016-09-19
2016-11-05
2016-11-05
2016-11-15
2016-11-18 11UHA
2016-10-26
2016-10-26
2016-11-12
2016-11-12
2016-11-22
2016-10-31
2016-10-31
2016-11-12
2016-11-12
2016-11-22
2016-11-18 00; 00C ; 10; 10MA ; 11; 12; 1x; 20MA ; 20MKA; 21MB ; 22MB 2016-11-18 11UHA
2016-11-02
2016-11-02
2016-11-12
2016-11-12
2016-11-22
2016-11-18 21CYE; 22CYE
2016-10-19
2016-10-19
2016-11-07
2016-11-07
2016-11-17
2016-11-19 22BAA
2016-10-31
2016-10-31
2016-11-10
2016-11-10
2016-11-20
2016-11-21 42MBR
2016-10-13
2016-10-12
2016-11-05
2016-11-05
2016-11-15
2016-11-21 10URA; 20URA
2016-10-19
2016-10-19
2016-11-12
2016-11-12
2016-11-22
2016-11-22 00
2016-11-09
2016-11-09
2016-11-11
2016-11-11
2016-11-16
2016-11-22 22CYE
2016-11-11
2016-11-11
2016-11-14
2016-11-14
2016-11-19
2016-11-22 00C ; 00EKH; 31C ; 32C ; 42MB
2016-11-15
2016-11-15
2016-11-16
2016-11-16
2016-11-21
2016-11-22 21C
2016-11-09
2016-11-09
2016-11-12
2016-11-12
2016-11-17
2016-11-23 00
2016-11-15
2016-11-16
2016-11-16
2016-11-16
2016-11-21
2016-11-23 00UEN
2016-11-16
2016-11-15
2016-11-22
2016-11-21
2016-11-27
2016-11-24 00URA
2016-11-17
2016-11-17
2016-11-19
2016-11-19
2016-11-24
2016-11-24 22MBR
2016-11-18
2016-11-18
2016-11-18
2016-11-18
2016-11-23
2016-11-24 41MBR
4649 Air
1
0,98
0 Düsseldorf
CAIRO
3564 Air
10
101,30
0 Düsseldorf
CAIRO
4509 Sea
161
195184,00
4488 Sea
1
4590 Sea
458 Shanghai
ALEXANDRIA
17655,19
67 Chennai
ALEXANDRIA
1
16561,00
69 Rotterdam
ALEXANDRIA
4579 Sea
1
9213,00
67 Rotterdam
ALEXANDRIA
4494 Sea
75
244952,95
4653 Air
3
64,20
0 München
CAIRO
3562 Air
2
149,35
0 Frankfurt
CAIRO
4453 Sea
81
962450,81
4554 Sea
10
27410,00
69 Gemlik
ALEXANDRIA
4572 Sea
12
26072,00
329 Hamburg
ALEXANDRIA
4549 Sea
39
64874,70
133 Hamburg
ALEXANDRIA
4423 Sea
6
10784,40
74 Santos
ALEXANDRIA
4427 Sea
6
26335,00
29 Ulsan
BURULLUS
4498 Sea
5
51997,00
4619 Air
5
226,20
4655 Air
1
62,00
4645 Air
1
2368,00
4667 Air
1
9,50
4551 Sea
2
28073,30
655 Mumbai
ALEXANDRIA
5012 Laem Chabang ALEXANDRIA
378 Shanghai
ALEXANDRIA
1 Düsseldorf
CAIRO
0 Prag
CAIRO
6 Frankfurt
CAIRO
0 Düsseldorf
CAIRO
134 Shanghai
ALEXANDRIA
AF341M/19 AF508/20 #05752956120 KL8440/16 MP8910/21 #07449773286 CSCL SPRING #YMLUM2313 84973 EURO MAX #YMLUM5150 68417 MSC SEATTLE #MSCURK308 576 MSC SEATTLE #MSCURK278 258 BBC CANADA #MUMALEX00 1 MS788/19 #07790881221 TK1884/19 TK690/20 #23510063093 THORCO LOGOS #LCBALE4431 0 MSC GIOVANNA #MSCURK248 350 MSC SASHA #MSCURK281 997 MSC SASHA #MSCURK287 622 MSC AJACCIO #MSCUZS829 845 DA TONG YUN #ULS-ALX4427 CSCL SPRING #YMLUM2313 84975 AF341M/21 AF508/23 #05752956131 OS712/22 OS863 #02053562025 MS1584/23 MS537/23 #07790881210 KL8440/24 KL553/25 #074-4977 3312 CSCL WINTER #YMLUM2313 87920
2016-11-18
2016-11-18
2016-11-20
2016-11-21
2016-11-25
2016-11-24 40SGY
2016-11-16
2016-11-17
2016-11-21
2016-11-21
2016-11-26
2016-11-24 00MA
2016-10-19
2016-10-19
2016-11-12
2016-11-12
2016-11-22
2016-11-24 30URA; 40URA
2016-10-20
2016-10-20
2016-11-20
2016-11-19
2016-11-30
2016-11-25 11MB
2016-11-07
2016-11-08
2016-11-19
2016-11-19
2016-11-29
2016-11-25 11UHA
2016-11-07
2016-11-08
2016-11-19
2016-11-19
2016-11-29
2016-11-25 12UHA
2016-10-13
2016-10-14
2016-11-01
2016-11-01
2016-11-11
2016-11-26 00URA; 10URA; 20URA; 30URA; 40URA
2016-11-19
2016-11-19
2016-11-19
2016-11-19
2016-11-24
2016-11-26 00MB
2016-11-19
2016-11-19
2016-11-20
2016-11-20
2016-11-25
2016-11-26 32BAT
2016-10-17
2016-10-15
2016-11-10
2016-11-09
2016-11-20
2016-11-27 22UHA
2016-11-07
2016-11-07
2016-11-18
2016-11-18
2016-11-28
2016-11-27 10; 1x
2016-11-02
2016-11-03
2016-11-19
2016-11-19
2016-11-29
2016-11-27 11MB ; 12MB ; 21MB ; 22MB
2016-11-02
2016-11-03
2016-11-19
2016-11-19
2016-11-29
2016-11-27 10; 10MA ; 10MKA; 21CYE; 22CYE; 30URA
2016-09-27
2016-09-23
2016-10-23
2016-10-23
2016-11-02
2016-11-28 10URA
2016-10-04
2016-10-04
2016-11-24
2016-11-24
2016-12-04
2016-11-28 21UHA
2016-10-19
2016-10-19
2016-11-26
2016-11-26
2016-12-06
2016-11-28 22UHA
2016-11-21
2016-11-21
2016-11-23
2016-11-23
2016-11-28
2016-11-28 21C ; 42MB ; 42MBA; 42MBR; 99UBA
2016-11-22
2016-11-22
2016-11-23
2016-11-23
2016-11-28
2016-11-28 41MB
2016-11-23
2016-11-23
2016-11-23
2016-11-23
2016-11-28
2016-11-28 31MKA
2016-11-24
2016-11-24
2016-11-26
2016-11-26
2016-12-01
2016-11-28 32MBR
2016-10-28
2016-10-26
2016-11-22
2016-11-22
2016-12-07
2016-11-28 21UHA
4581 Air
1
58,00
0 Charlotte
CAIRO
4612 Sea
3
28600,00
209 Hamburg
ALEXANDRIA
4477 Sea
6
11590,10
74 Santos
ALEXANDRIA
4638 Air
9
1451,00
5 Frankfurt
CAIRO
4489 Air
1
125,00
1 Frankfurt
CAIRO
4666 Air
2
171,00
1 Wien
CAIRO
4660 Air
6
99,80
0 Düsseldorf
CAIRO
3566 Air
5
85,40
0 Frankfurt
CAIRO
3565 Air
1
5,00
0 Wien
CAIRO
4562 Air 4583 Sea
1 21
310,00 8504,00
4611 Sea
1
4523 Sea
3 Frankfurt 22 Hamburg
CAIRO ALEXANDRIA
18130,00
67 Rotterdam
ALEXANDRIA
10
10745,00
51 Hamburg
ALEXANDRIA
4517 Sea
7
94816,00
468 Shanghai
ALEXANDRIA
3561 Sea
20
28832,00
4328 Sea
129
87561,00
4570 Sea
29
23254,17
4661 Air
1
4765,00
4664 Air
8
23
4557 Sea
38 Antwerpen 224 Yilport 99 Hamburg
ALEXANDRIA ALEXANDRIA ALEXANDRIA
2 Amsterdam
CAIRO
426,50
1 Frankfurt
CAIRO
13143,00
26 Shanghai
ALEXANDRIA
EY130/22 EY653/24 #60772126596 RIO MADEIRA #SGL393107 MSC MELINE #MSCUZS839 042 KL8440/23 KL553/24 #07449773301 KL8350/23 KL553/24 #07449773290 TK1888/24 TK0690/25 #23562467296 AF341M/25 AF6752/26 #05752956142 KL8440/24 KL553/28 #07449773334 TK1888/24 TK694/25 #23562467263 LH584/21 MSC ANTIGUA #MSCURK305 960 MSC MELISSA #MSCURK344 860 MSC AGRIGENTO #MSCURK333 442 GUTHORM MAERSK #MSCUYD937 895 MSC MELISSA #MSCURK318 047 MSC JENNY #MSCURK292 051 RIO BRAVO #MSCURK339 696 KL8440/25 MP8910/28 #07449773323 KL8440/01 KL553/02 #07449773345 COSCO KAOHSIUNG #YMLUM2313 89684
2016-11-21
2016-11-21
2016-11-24
2016-11-24
2016-11-29
2016-11-28 31MKA
2016-11-16
2016-11-16
2016-11-26
2016-11-27
2016-12-06
2016-11-30 00ABK
2016-10-05
2016-10-05
2016-10-29
2016-10-29
2016-11-08
2016-12-01 20URA
2016-11-23
2016-11-23
2016-11-25
2016-11-25
2016-11-30
2016-12-01 00C ; 00EKH; 10MA ; 41MK ; 42MB ; 42UBA
2016-11-23
2016-11-23
2016-11-25
2016-11-25
2016-11-30
2016-12-01 00ABA
2016-11-24
2016-11-24
2016-11-25
2016-11-25
2016-11-30
2016-12-01 42CYE
2016-11-25
2016-11-25
2016-11-27
2016-11-27
2016-12-02
2016-12-01 00C ; 00EKH; 42MB ; 42MBR
2016-11-24
2016-11-24
2016-11-29
2016-11-26
2016-12-04
2016-12-01 41MK
2016-11-24
2016-11-24
2016-11-25
2016-11-25
2016-11-30
2016-12-01 42CYE
2016-10-21 2016-11-09
2016-11-10
2016-11-14 2016-11-27
2016-11-27
2016-12-07
2016-12-02 00ABA 2016-12-02 00; 10; 11; 12; 99
2016-11-14
2016-11-14
2016-11-27
2016-11-27
2016-12-07
2016-12-02 12UHA
2016-11-09
2016-11-10
2016-11-27
2016-11-27
2016-12-07
2016-12-03 11MBR
2016-10-26
2016-10-25
2016-11-29
2016-11-29
2016-12-09
2016-12-03 11UHA
2016-11-12
2016-11-12
2016-11-27
2016-11-27
2016-12-07
2016-12-04 21CYE; 22CYE
2016-11-16
2016-11-16
2016-11-29
2016-11-29
2016-12-09
2016-12-04 10SGC; 20SGC; 30SGC; 40SGC
2016-11-09
2016-11-10
2016-11-26
2016-11-27
2016-12-06
2016-12-05 00C ; 10; 10EKH; 10MA ; 11; 12; 20MA ; 22MB
2016-11-25
2016-11-24
2016-12-01
2016-11-29
2016-12-06
2016-12-07 12UHA
2016-12-01
2016-12-01
2016-12-03
2016-12-03
2016-12-08
2016-12-07 00C ; 00URA; 11C ; 11MB ; 30C
2016-11-02
2016-11-03
2016-12-03
2016-12-03
2016-12-13
2016-12-07 1x
4569 Sea
10
40376,58
160 Ho Chi Minh Port
ALEXANDRIA
4416 Sea
113
69077,93
38 Shanghai
ALEXANDRIA
4555 Sea
2
22853,00
151 Shanghai
ALEXANDRIA
4556 Sea
9
22250,00
124 Izmir
ALEXANDRIA
4419 Sea
6607 Ulsan
24
3086000,00
3560 Air
4
3,00
4496 Sea
6
26335,00
4487 Sea
14
37579,10
157 Antwerpen
ALEXANDRIA
4589 Sea
24
10348,14
37 Hamburg
ALEXANDRIA
4410 Sea
9
118000,00
1257 Ho Chi Minh Port
ALEXANDRIA
4530 Sea
11
206349,00
796 Banten
ALEXANDRIA
4475 Sea
11
206233,00
837 Banten
ALEXANDRIA
4540 Sea
2
4832,60
36 Antwerpen
4636 Air
1
510,00
1 Düsseldorf
4644 Sea
2
42602,00
134 Rotterdam
2934 Air
1
17,50
4394 Sea
5
25083,00
4532 Sea
6
4474 Sea
0 Budapest
29 Ulsan
0 Frankfurt
BURULLUS CAIRO
BURULLUS
ALEXANDRIA CAIRO
ALEXANDRIA CAIRO
179 Ho Chi Minh Port
ALEXANDRIA
144985,00
656 Banten
ALEXANDRIA
2
152547,00
461 Banten
ALEXANDRIA
4524 Sea
2
152200,00
461 Banten
ALEXANDRIA
4586 Sea
2
13765,00
4679 Air
2
485,00
59 Hamburg 4 Stockholm
ALEXANDRIA CAIRO
YM INTERACTION #YMLUM4903 01480 COSCO KAOHSIUNG #YMLUM2313 89594 COSCO KAOHSIUNG #YMLUM2313 89616 TURKON EGYPT #ALIALY71090 4 DA TONG YUN # BA869/25 BA155/27 #12532987732 DA HONG XIA #ULS-ALX4496 AMELAND #014 MSC BRUNELLA #MSCURK365 337 VICENTE #POBUSGNAL Y160001 VICENTE #POBUBATALY 160004 VICENTE #POBUBATALY 160002 AMELAND #015 KL8440/16 KL553/17 #07449773275 MSC LORETTA #MSCURK422 799 MS1520/01 MS541/02 #07790881232 VICENTE #POBUSGNAL Y160002 VICENTE #POBUBATALY 160005 VICENTE #POBUBATALY 160001 VICENTE #POBUBATALY 160003 AMELAND #013 KL9316/30 KL8160/01 MP8 #07450679392
2016-11-08
2016-11-06
2016-12-03
2016-12-03
2016-12-13
2016-12-07 12MBR
2016-11-02
2016-11-03
2016-12-03
2016-12-03
2016-12-13
2016-12-08 00
2016-11-02
2016-11-03
2016-12-03
2016-12-03
2016-12-13
2016-12-08 31UHA
2016-11-23
2016-11-23
2016-11-27
2016-11-27
2016-12-07
2016-12-08 20URA
2016-10-04
2016-10-04
2016-11-24
2016-11-24
2016-12-04
2016-12-09 21UHA
2016-11-26
2016-11-27
2016-11-30
2016-12-01
2016-12-05
2016-12-09 10MA
2016-11-01
2016-11-01
2016-12-03
2016-12-03
2016-12-13
2016-12-10 12UHA
2016-11-15
2016-11-16
2016-11-30
2016-12-01
2016-12-10
2016-12-10 00
2016-11-16
2016-11-17
2016-12-04
2016-12-04
2016-12-14
2016-12-10 00
2016-10-15
2016-10-23
2016-11-25
2016-11-26
2016-12-05
2016-12-11 12MBR
2016-11-04
2016-11-06
2016-11-25
2016-11-26
2016-12-05
2016-12-12 20MA
2016-11-04
2016-11-06
2016-11-25
2016-11-26
2016-12-05
2016-12-12 10MA
2016-11-15
2016-11-16
2016-11-30
2016-12-01
2016-12-10
2016-12-12 00; 20MA
2016-11-16
2016-11-16
2016-11-18
2016-11-18
2016-11-23
2016-12-12 00
2016-11-21
2016-11-23
2016-12-04
2016-12-04
2016-12-14
2016-12-12 11UHA
2016-12-01
2016-12-01
2016-12-02
2016-12-02
2016-12-07
2016-12-12 00
2016-10-15
2016-10-23
2016-11-25
2016-11-25
2016-12-05
2016-12-13 11UHA; 21UHA
2016-11-04
2016-11-06
2016-11-25
2016-11-26
2016-12-05
2016-12-13 10MA
2016-11-04
2016-11-06
2016-11-25
2016-11-25
2016-12-05
2016-12-14 10MA
2016-11-04
2016-11-06
2016-11-25
2016-11-25
2016-12-05
2016-12-14 20MA
2016-11-15
2016-11-16
2016-11-30
2016-12-01
2016-12-10
2016-12-14 12MBJ
2016-11-30
2016-11-30
2016-12-07
2016-12-07
2016-12-12
2016-12-14 10PUR
2925 Sea 2929 Sea
9 9
29527,61 29527,61
44 Blexen 44 Blexen
ALEXANDRIA ALEXANDRIA
3568 Air
4
2,00
0 Budapest
CAIRO
4703 Air
6
474,75
2 Frankfurt
CAIRO
2935 Air
2
481,50
1 Frankfurt
CAIRO
4476 Sea
14
267991,00
4591 Sea
16
4567 Sea
4753 Air
711 Antwerpen
ALEXANDRIA
14175,16
40 Hamburg
ALEXANDRIA
3
28996,00
201 Shanghai
ALEXANDRIA
2
32,10
0 Frankfurt
4456 Sea
95
1099958,00
4588 Sea
1
10119,70
78 Shanghai
ALEXANDRIA
4584 Sea
1
17675,19
67 Mumbai
ALEXANDRIA
4662 Sea
1
19594,00
67 Rotterdam
ALEXANDRIA
4620 Sea
1
15860,00
86 Hamburg
ALEXANDRIA
4580 Sea
4
52493,00
268 Shanghai
ALEXANDRIA
4610 Sea
803 Hamburg
ALEXANDRIA
CAIRO
5981 Laem Chabang ALEXANDRIA
12
89965,00
4690 Air
3
9096,00
6 Amsterdam
CAIRO
4712 Air
2
1470,00
1 Amsterdam
CAIRO
4528 Air
1
4544,00
3 Amsterdam
CAIRO
4738 Air
1
120,00
1 Amsterdam
CAIRO
4564 Sea
6
19000,00
153 Hamburg
ALEXANDRIA
ROCHEFORT # HOHE BANK #HOHE_BLEBUR-1C BA869/02 BA0155/04 #12532987721 MS1520/05 MS541/07 #07790881243 AF341/05 AF6740/07 #05752956164 AMELAND #016 MSC ALGECIRAS #MSCURK371 509 CSCL YELLOW SEA #YMLUM2313 92970 MS1520 MS541 #07790881254 THORCO LILY #LCBALE5460 4 CSCL YELLOW SEA #YMLUM2313 92972 BOMAR SPRING #YMLUM5150 68443 E.R. YOKOHAMA #MSCURK471 952 RIO BRAVO #SGL395446 CSCL YELLOW SEA #YMLUM2313 92980 RIO BRAVO #SGL392626 AF8625/06 AF6740/07 #05747880195 KL553/08 #07452400880 KL8440/09 KL8910/12 #07453010366 MS1534 MS521 #07796127872 MSC ALGECIRAS #MSCURK375 427
2016-10-15 2016-10-20
2016-10-14 2016-10-20
2016-10-30 2016-11-06
2016-10-30 2016-11-06
2016-11-09 2016-11-16
2016-12-14 21MB 2016-12-14 22MB
2016-12-02
2016-12-03
2016-12-06
2016-12-07
2016-12-11
2016-12-14 20MA
2016-12-05
2016-12-07
2016-12-07
2016-12-07
2016-12-12
2016-12-15 00; 00MA
2016-12-05
2016-12-05
2016-12-08
2016-12-08
2016-12-13
2016-12-15 00MA
2016-11-15
2016-11-16
2016-11-30
2016-12-01
2016-12-10
2016-12-17 00ABK; 10MA
2016-11-23
2016-11-23
2016-12-11
2016-12-11
2016-12-21
2016-12-17 00C ; 10MA ; 20PGB; 21MB ; 2x
2016-11-09
2016-11-09
2016-12-11
2016-12-11
2016-12-21
2016-12-17 31UHA
2016-12-13
2016-12-14
2016-12-15
2016-12-14
2016-12-20
2016-12-17 00EKH; 41MB
2016-10-15
2016-10-13
2016-11-03
2016-11-03
2016-11-13
2016-12-18 12UHA; 21UHA
2016-11-09
2016-11-09
2016-12-11
2016-12-11
2016-12-21
2016-12-18 22UHA
2016-11-10
2016-11-10
2016-12-11
2016-12-11
2016-12-21
2016-12-18 21UHA
2016-11-28
2016-11-29
2016-12-11
2016-12-11
2016-12-21
2016-12-18 11UHA
2016-11-30
2016-11-30
2016-12-10
2016-12-10
2016-12-20
2016-12-18 00URA
2016-11-09
2016-11-09
2016-12-11
2016-12-11
2016-12-21
2016-12-18 12UHA; 31UHA
2016-11-30
2016-11-30
2016-12-10
2016-12-10
2016-12-20
2016-12-19 21UHA
2016-12-04
2016-12-06
2016-12-15
2016-12-15
2016-12-20
2016-12-19 12UHA
2016-12-08
2016-12-08
2016-12-09
2016-12-09
2016-12-14
2016-12-19 11UHA
2016-12-09
2016-12-15
2016-12-15
2016-12-15
2016-12-20
2016-12-19 11UHA
2016-12-16
2016-12-16
2016-12-17
2016-12-17
2016-12-22
2016-12-19 00UEN
2016-11-23
2016-11-23
2016-12-11
2016-12-11
2016-12-21
2016-12-19 21UHA
4434 Sea
14
46080,00
4497 Sea
24
3086000,00
4593 Air
1
183,00
0 Kuala Lumpur CAIRO
4686 Air
1
420,00
0 Amsterdam
CAIRO
4721 Air
1
270,00
4 Amsterdam
CAIRO
4707 Air
2
677,00
3 Yilport
CAIRO
4714 Air
1
152,00
0 Shanghai
CAIRO
4720 Air
3
2571,00
6 Prag
CAIRO
4723 Air
2
1952,00
4 Frankfurt
CAIRO
4724 Air
5
333,30
2 Frankfurt
CAIRO
4718 Air
1
45,00
0 Milano
CAIRO
4542 Sea
6
38410,00
4531 Sea
6
11620,00
74 Santos
ALEXANDRIA
4648 Sea
10
27410,00
71 Gemlik
ALEXANDRIA
1
325,00
4537 Sea
13
137257,16
4606 Sea
2
12462,00
4639 Sea
35
41836,00
175 Hamburg
ALEXANDRIA
4754 Air
20
5364,33
27 Frankfurt
ALEXANDRIA
4615 Sea
2
23121,00
134 Shanghai
ALEXANDRIA
4704 Air
6
2362,37
7 Frankfurt
CAIRO
4733 Air
1
383,00
1 Frankfurt
CAIRO
4774 Air
38 Shanghai
6607 Ulsan
ALEXANDRIA
ALEXANDRIA
259 Laem Chabang ALEXANDRIA
1 Frankfurt
CAIRO
966 Laem Chabang ALEXANDRIA 92 Ho Chi Minh Port
ALEXANDRIA
HYUNDAI PRIDE #HLCUSHA160 8EATX1 DA HONG XIA #ULS-ALX4497 QR849/18 QR1301/20 #15702025866 AF8625/06 AF6740/07 #05747880206 MS1534/09 MS521/10 #07796127301 MS543/10 #07796091903 EK9873/11 #17634571110 RFS/14 MS537 #07792563693 TK6431 TK6468 #23562467521 KL8440 KL553 #07453010381 KL553 #07451682245 BBC NEW YORK #LAEALE001 MSC ARICA #MSCUZS873 025 MSC GIOVANNA #MSCURK439 710 MS1584 MS541 #07790881276 BBC NEW YORK #LAEALE002 YM IMAGE #YMLUM4903 01748 RIO BLANCO #SGL401687
2016-10-26
2016-10-28
2016-12-12
2016-12-12
2016-12-22
2016-12-20 00
2016-11-01
2016-11-01
2016-12-03
2016-12-03
2016-12-13
2016-12-20 12UHA
2016-11-19
2016-11-19
2016-11-23
2016-11-22
2016-11-28
2016-12-20 11UHA
2016-12-06
2016-12-06
2016-12-15
2016-12-15
2016-12-20
2016-12-20 00UEN
2016-12-09
2016-12-10
2016-12-10
2016-12-12
2016-12-15
2016-12-20 00UEN
2016-12-10
2016-12-10
2016-12-10
2016-12-10
2016-12-15
2016-12-20 41SGY
2016-12-11
2016-12-11
2016-12-12
2016-12-12
2016-12-17
2016-12-20 1x
2016-12-14
2016-12-14
2016-12-16
2016-12-16
2016-12-21
2016-12-20 42MB
2016-12-14
2016-12-14
2016-12-17
2016-12-17
2016-12-22
2016-12-20 11CYE
2016-12-15
2016-12-15
2016-12-17
2016-12-17
2016-12-22
2016-12-20 00; 00C ; 00MK ; 00UEN
2016-12-15
2016-12-17
2016-12-16
2016-12-17
2016-12-21
2016-12-20 00URA
2016-11-17
2016-11-16
2016-12-06
2016-12-06
2016-12-16
2016-12-20 22MBR
2016-11-01
2016-11-02
2016-12-10
2016-12-10
2016-12-20
2016-12-21 30URA
2016-11-25
2016-11-27
2016-12-10
2016-12-10
2016-12-20
2016-12-21 20
2017-12-17
2016-12-17
2016-12-17
2016-12-17
2016-12-22
2016-12-21 42MB
2016-11-17
2016-11-16
2016-12-06
2016-12-06
2016-12-16
2016-12-22 22UHA
2016-11-22
2016-11-23
2016-12-18
2016-12-15
2016-12-28
2016-12-22 12UHA
2016-12-07
2016-12-07
2016-12-17
2016-12-17
2016-12-27
MS541 #07790881265 COSCO HELLAS #YMLUM2313 96657 KL8440/09 MP8910/12 #07453010355 AF341M AF508 #05752956175
2016-12-18
2016-12-18
2016-12-18
2016-12-17
2016-12-23
2016-12-22 00C ; 10LCL; 10MA ; 12MKA; 20; 21; 22; 2x; 30MA ; 31UBA; 32UBA; 3x 2016-12-23 00
2016-11-16
2016-11-17
2016-12-18
2016-12-15
2016-12-28
2016-12-24 32UHA
2016-12-09
2016-12-15
2016-12-15
2016-12-15
2016-12-20
2016-12-24 00C ; 00EKH; 21MB ; 99BTA
2016-12-13
2016-12-21
2016-12-15
2016-12-21
2016-12-20
2016-12-24 00C
4716 Air
5
811,55
8 Frankfurt
4575 Sea
4
62789,60
268 Shanghai
ALEXANDRIA
3559 Sea
31
295,73
2 Hamburg
ALEXANDRIA CAIRO
4771 Air
CAIRO
1
480,00
3 Frankfurt
4605 Sea
73
81216,00
215 Shanghai
ALEXANDRIA
4604 Sea
1
12426,00
67 Chennai
ALEXANDRIA
4516 Sea
12
152885,41
4545 Sea
5
3357,00
4529 Sea
1
13758,00
4736 Air
7
1314,00
4632 Sea
2
27153,30
4705 Air
1
104,20
4627 Sea
8
8897,00
50 Hamburg
ALEXANDRIA
4533 Sea
85
117110,50
399 Hamburg
ALEXANDRIA
1
865,70
4548 Sea
17
24410,00
4571 Sea
35
299622,19
1075 Busan
ALEXANDRIA
4573 Sea
14
170896,30
937 Ulsan
ALEXANDRIA
4782 Air
1
0,50
0 Wien
CAIRO
4783 Air
1
15,00
0 D端sseldorf
CAIRO
4776 Air
1
0,15
0 Prag
CAIRO
3574 Air
1
5,02
0 D端sseldorf
CAIRO
4739 Air
803 Ulsan
ALEXANDRIA
13 Laem Chabang ALEXANDRIA 67 Ulsan 9 D端sseldorf 134 Shanghai
0 D端sseldorf
1 Genua 65 Ulsan
ALEXANDRIA CAIRO ALEXANDRIA
CAIRO
CAIRO ALEXANDRIA
KL8440 MP8910 #07453010370 COSCO HELLAS #YMLUM2313 92971 MSC ATHENS #MSCURK443 266 LH8290 #02099051116 COSCO HELLAS #YMLUM2313 95788 EURO MAX #YMLUM5150 68447 MSC MARGRIT #MSCUKU536 534 MSC CLAUDIA #MSCUW7106 492 MSC MARGRIT #MSCUKU536 716 MS1520 + MS541 #07790881280 GERDA MAERSK #MSCUYF3421 28 MS1520 + MS541 #07790881291 MSC ATHENS #MSCURK390 046 MSC ATHENS #MSCURK436 096 KL8800 MP8910 #07449682732 MSC MARGRIT #MSCUKU537 334 MSC EVA #MSCUKU543 753 MSC EVA #MSCUKU544 009 MS798/22 #07792596770 MS1520/22 MS541/23 #07790881302 LH1393 + LH8290 #02053562320 AF361/24 AF508/25 #05752956190
2016-12-16
2016-12-16
2016-12-19
2016-12-19
2016-12-24
2016-12-24 00UEN; 21UBA; 22UBA; 31MB ; 41MK
2016-11-16
2016-11-17
2016-12-18
2016-12-15
2016-12-28
2016-12-24 22UHA
2016-11-30
2016-11-30
2016-12-17
2016-12-17
2016-12-27
2016-12-24 00ABK; 10MKA; 11MK ; 12MKA; 20MKA
2016-12-20
2016-12-20
2016-12-20
2016-12-20
2016-12-25
2016-12-24 10PAB
2016-11-16
2016-11-17
2016-12-18
2016-12-15
2016-12-28
2016-12-25 40URA
2016-11-17
2016-11-17
2016-12-18
2016-12-15
2016-12-28
2016-12-25 11UHA
2016-11-06
2016-11-06
2016-12-16
2016-12-16
2016-12-26
2016-12-25 11UHA
2016-11-08
2016-11-09
2016-12-16
2016-12-16
2016-12-26
2016-12-25 12MBR
2016-11-06
2016-11-06
2016-12-16
2016-12-16
2016-12-26
2016-12-26 11UHA
2016-12-20
2016-12-21
2016-12-21
2016-12-21
2016-12-26
2016-12-26 00MK ; 42C ; 42MBR; 42MKA
2016-11-22
2016-11-22
2016-12-21
2016-12-21
2016-12-31
2016-12-27 12UHA
2016-12-20
2016-12-20
2016-12-23
2016-12-21
2016-12-28
2016-12-27 22MBR
2016-11-30
2016-11-30
2016-12-17
2016-12-17
2016-12-27
2016-12-28 12MBR
2016-11-30
2016-11-30
2016-12-17
2016-12-17
2016-12-27
2016-12-23
2016-12-23
2016-12-26
2016-12-26
2016-12-31
2016-12-28 10MA ; 11MK ; 12MKA; 1X; 20LBG; 20MA ; 20MKA; 2X; 30MA ; 40MA ; 4X 2016-12-28 00URA
2016-11-06
2016-11-06
2016-12-16
2016-12-16
2016-12-26
2016-12-28 10; 11; 12
2016-11-12
2016-11-13
2016-12-18
2016-12-18
2016-12-28
2016-12-28 00
2016-11-12
2016-11-13
2016-12-19
2016-12-18
2016-12-29
2016-12-28 21UHA
2016-12-22
2016-12-22
2016-12-22
2016-12-22
2016-12-27
2016-12-28 11CYE
2016-12-22
2016-12-22
2016-12-23
2016-12-22
2016-12-28
2016-12-28 00
2016-12-22
2016-12-22
2016-12-22
2016-12-22
2016-12-27
2016-12-28 41MB
2016-12-24
2016-12-23
2016-12-25
2016-12-26
2016-12-30
2016-12-28 32MB
4626 Sea
70
85908,00
116 Hamburg
ALEXANDRIA
4565 Sea
12
60642,00
102 Hamburg
ALEXANDRIA
4536 Sea
81
962450,81
4791 Air
1
1,10
4794 Air
1
980,00
4768 Air
10
4800 Air
4780 Air
4998 Laem Chabang ALEXANDRIA 0 Wien
CAIRO
1 Antwerpen
CAIRO
1817,08
7 Frankfurt
CAIRO
1
35,00
0 Frankfurt
CAIRO
1
55,00
0 Frankfurt
CAIRO
4560 Sea
30
27160,00
66 Busane
ALEXANDRIA
4607 Sea
3
35821,00
259 Hamburg
ALEXANDRIA
4603 Sea
3
28009,00
201 Shanghai
ALEXANDRIA
4643 Sea
59
74858,30
236 Hamburg
ALEXANDRIA
4808 Air
10
2894,50
4609 Sea
346
310705,00
766 Hamburg
ALEXANDRIA
4680 Sea
68
69551,40
129 Hamburg
ALEXANDRIA
4809 Air
1
243,83
1 Istanbul
CAIRO
4803 Air
1
185,00
1 Chennai
CAIRO
4807 Air
1
1,00
0 Prag
CAIRO
4798 Air
3
13770,00
8 Amsterdam
CAIRO
28 Abu Dhabi UAE
CAIRO
MSC ALGECIRAS #MSCURK410 364 MSC ATHENS #MSCURK437 003 BBC NEW YORK #LAEALE0003 MS798/24 #07792596825 MS1534/24 MS521/25 #07796384481 MS1520/27 MS541/28 #07790881324 MS1520/27 MS541/28 #07790881313 KL8440/23 KL553/26 #07453010403 HYUNDAI DRIVE #HLCUSEL161 104575 MSC CHLOE #MSCURK333 467 COSCO YANTIAN #YMLUM2314 00934 MSC CHLOE #MSCURK505 486 MS915/03 #07791730785 MSC BILBAO #MSCURK466 044 MSC BILBAO #MSCURK576 883
2016-11-23
2016-11-23
2016-12-17
2016-12-17
2016-12-27
2016-12-29 00
2016-11-30
2016-11-30
2016-12-17
2016-12-17
2016-12-27
2016-12-29 10MA
2016-11-17
2016-11-16
2016-12-06
2016-12-06
2016-12-16
2016-12-30 31UHA
2016-12-24
2016-12-24
2016-12-24
2016-12-24
2016-12-29
2017-01-02 99UBA
2016-12-24
2016-12-24
2016-12-25
2016-12-25
2016-12-30
2017-01-02 11UHA
2016-12-27
2016-12-27
2016-12-28
2016-12-28
2017-01-02
2017-01-02 00C ; 00EKH; 00URA; 10MKA; 22MB ; 41MK ; 42MB ; 42MKA; 99UBA
2016-12-27
2016-12-27
2016-12-28
2016-12-28
2017-01-02
2017-01-02 00CHA
2016-12-28
2016-12-28
2016-12-31
2016-12-31
2017-01-05
2017-01-02 00
2016-11-07
2016-11-07
2016-12-29
2016-12-29
2017-01-08
2017-01-03 00; 10; 11; 12
2016-12-07
2016-12-09
2016-12-28
2016-12-28
2017-01-07
2017-01-04 20UEN
2016-11-30
2016-11-30
2017-01-01
2017-01-01
2017-01-11
2017-01-06 32UHA
2016-12-07
2016-12-09
2016-12-28
2016-12-28
2017-01-07
2017-01-03
2017-01-03
2017-01-03
2017-01-04
2017-01-08
2017-01-06 00; 10; 10MA ; 11MK ; 12MKA; 1X; 1x; 20; 20MA ; 21; 22; 2X; 2x; 30; 3x; 40; 4x 2017-01-09 41MB
2016-12-14
2016-12-14
2017-01-03
2017-01-03
2017-01-13
2017-01-10 00
2016-12-14
2016-12-14
2017-01-03
2017-01-03
2017-01-13
TK0692/04 #23561151031 EY927/04 EY789/05 #60771870702 LH1393/06 LH586/07 #02053562364 MS1534/28 MS521/29 #07796384772
2017-01-04
2017-01-04
2017-01-04
2017-01-04
2017-01-09
2017-01-10 00; 00C ; 10EKH; 10MA ; 11; 12; 12MKA; 1X; 1x; 20MA ; 21; 22; 2X; 2x; 30MK ; 30MKA; 31; 32; 3x; 40URA; 4x 2017-01-10 10SGC
2017-01-04
2017-01-04
2017-01-05
2017-01-05
2017-01-10
2017-01-11 11UHA
2017-01-06
2017-01-06
2017-01-07
2017-01-07
2017-01-12
2017-01-11 42MB
2016-12-28
2016-12-28
2016-12-29
2016-12-29
2017-01-03
2017-01-11 22UHA
3576 Air
11
182,50
1 Frankfurt
CAIRO
3557 Air
5
22,31
0 Jakarta
CAIRO
3563 Air
17
108,00
0 Jakarta
CAIRO
4773 Air
2
2277,90
2 Düsseldorf
CAIRO
4681 Sea
12
62046,00
4734 Sea
1
21564,00
4668 Sea
12
89815,00
803 Hamburg
ALEXANDRIA
4613 Sea
24
99270,00
1045 Antwerpen
ALEXANDRIA
4614 Sea
16
32140,00
250 Antwerpen
ALEXANDRIA
4657 Sea
2
18888,00
134 Houston
ALEXANDRIA
4805 Air
4
106,50
0 Düsseldorf
4647 Sea
8
32940,00
347 Antwerpen
ALEXANDRIA
4601 Sea
2
12400,00
103 Antwerpen
ALEXANDRIA
4594 Sea
5
29396,00
150 Antwerpen
ALEXANDRIA
4597 Sea
4
71100,00
284 Antwerpen
ALEXANDRIA
4715 Sea
6
4400,00
38 Hamburg
ALEXANDRIA
4701 Sea
92
22713,00
251 Hamburg
ALEXANDRIA
4577 Sea
1
29900,00
140 Antwerpen
ALEXANDRIA
4706 Sea
3
2966,00
4719 Sea
5
88470,00
4826 Air
8
1172,40
4793 Air
1
9,00
0 Charlotte
CAIRO
3577 Air
1
4,60
0 Frankfurt
CAIRO
102 Hamburg 67 Rotterdam
11 Yilport 262 Nhava Sheva
11 Prag
ALEXANDRIA ALEXANDRIA
CAIRO
ALEXANDRIA ALEXANDRIA
CAIRO
KL8350/01 MP8910/02 #07453010414 TK057/30 TK694/31 #23562004316 TK057/30 TK694/31 #23562004401 KL8440/05 KL553/06 #07453010425 MSC BILBAO #MSCURK518 232 MSC MELISSA #MSCURK608 181 RIO MADEIRA #SGL403304 VECTIS HARRIER VECTIS HARRIER NEW DELHI EXPRESS #HLCUHOU16 1207708 AF431/06 AF508/08 #05752956223 VECTIS HARRIER VECTIS HARRIER VECTIS HARRIER VECTRIS HARRIER MSC PARIS #MSCURK578 277 MSC PARIS #MSCURK564 186 VECTIS HARRIER MSC JENNY #MSCURK590 579 LONG BEACH TRADER #YMLUM5020 00527 LH7431S/06 LH8290/08 #02053562375 AF639/08 #05748967472 AF341/13 AF570/14 #05752956245
2017-01-01
2017-01-02
2017-01-02
2017-01-02
2017-01-07
2017-01-11 00STG
2016-12-30
2016-12-30
2016-12-31
2017-01-01
2017-01-05
2017-01-11 10MA
2016-12-30
2016-12-30
2016-12-31
2017-01-01
2017-01-05
2017-01-11 20MA
2017-01-05
2017-01-05
2017-01-07
2017-01-07
2017-01-12
2017-01-11 12MBR
2016-12-14
2016-12-14
2017-01-03
2017-01-03
2017-01-13
2017-01-12 20MA
2016-12-19
2016-12-20
2017-01-03
2017-01-03
2017-01-13
2017-01-12 11UHA
2016-12-21
2016-12-21
2017-01-01
2017-01-01
2017-01-11
2017-01-13 12UHA
2016-12-05
2016-12-06
2016-12-19
2016-12-20
2016-12-29
2017-01-14 00
2016-12-05
2016-12-06
2016-12-19
2016-12-20
2016-12-29
2017-01-14 00
2016-12-10
2016-12-12
2017-01-05
2017-01-05
2017-01-15
2017-01-14 11UHA; 21UHA
2017-01-06
2017-01-06
2017-01-08
2017-01-08
2017-01-13
2017-01-14 00; 41MB ; 41MK
2016-12-05
2016-12-06
2016-12-19
2016-12-20
2016-12-29
2017-01-15 00
2016-12-05
2016-12-06
2016-12-19
2016-12-20
2016-12-29
2017-01-15 11MBR; 12MBR
2016-12-06
2016-12-06
2016-12-19
2016-12-20
2016-12-29
2017-01-15 10MA
2016-12-09
2016-12-06
2016-12-19
2016-12-20
2016-12-29
2017-01-15 20UEN
2016-12-21
2016-12-23
2017-01-10
2017-01-10
2017-01-20
2017-01-15 11MBR; 12MBR
2016-12-21
2016-12-23
2017-01-10
2017-01-10
2017-01-20
2017-01-15 00
2016-12-05
2016-12-06
2016-12-19
2016-12-20
2016-12-29
2017-01-15 10EKH
2016-12-18
2016-12-25
2017-01-05
2017-01-07
2017-01-15
2017-01-16 10SGC; 11SGC; 20SGC
2016-12-23
2016-12-30
2017-02-23
2017-02-25
2017-03-05
2017-01-16 00
2017-01-06
2017-01-06
2017-01-09
2017-01-09
2017-01-14
2017-01-16 41MB
2017-01-08
2017-01-08
2017-01-10
2017-01-10
2017-01-15
2017-01-16 42MKA
2017-01-13
2017-01-13
2017-01-15
2017-01-15
2017-01-20
2017-01-16 32MB
4824 Air
1
85,00
0 Düsseldorf
CAIRO
4755 Sea
1
2770,00
6 Izmir
ALEXANDRIA
4792 Air
1
645,00
6 Wien
CAIRO
4466 Sea
5
85493,10
339 Shanghai
ALEXANDRIA
4424 Sea
5
85643,10
350 Shanghai
ALEXANDRIA
4696 Sea
678
235157,20
2041 Hamburg
ALEXANDRIA
4641 Sea
6
19000,00
153 Hamburg
ALEXANDRIA
4669 Sea
2
9845,00
42 Antwerpen
ALEXANDRIA
4731 Sea
1
7000,00
35 Antwerpen
ALEXANDRIA
4566 Sea
4
74655,39
4801 Air
2
13540,00
4621 Sea
4
64690,00
283 Antwerpen
ALEXANDRIA
4672 Sea
16
9460,00
18 Shanghai
ALEXANDRIA
4864 Air
6
687,00
3 Frankfurt
CAIRO
4819 Air
3
30,80
0 Düsseldorf
CAIRO
4851 Air
1
105,00
1 Düsseldorf
CAIRO
4622 Sea
6
95967,67
315 Nhava Sheva
ALEXANDRIA
4623 Sea
4
71365,00
210 Nhava Sheva
ALEXANDRIA
4697 Sea
2
44660,00
175 Antwerpen
ALEXANDRIA
4850 Air
1
40,00
210 Nhava Sheva 28 Incheon
0 Frankfurt
ALEXANDRIA CAIRO
CAIRO
AF341/11 AF570/13 #05752956234 MSC ISABELLE #MSCURK640 671
2017-01-11
2017-01-11
2017-01-13
2017-01-13
2017-01-18
2017-01-17 00
2016-12-28
2016-12-28
2017-01-11
2017-01-11
2017-01-21
2017-01-17 00URA
MS9537T/11 MS541/13 #07792596862 AMBER BEVERLY #AB1604SHAL X003 AMBER BEVERLY #AB1604SHAL X004 MSC PARIS #MSCURK542 299 MSC PARIS #MSCURK467 125 NOMADIC BERGEN #010 NOMADIC BERGEN #009 MALLECO #YMLUM5020 00507 CV6916/07 CV8501/09 #17219341420 NOMADIC BERGEN #008 COSCO AFRICA #YMLUM2314 04809 MS1520/13 MS541/15 #07790881372 MS1520/13 MS541/14 #07790881350 AF341/13 AF570/14 #05752956260 CONTI CANBERRA #YMLUM5020 00510 CONTI CANBERRA #YMLUM5020 00520 NOMADIC BERGEN #007 MS1520/13 MS541/14 #07790881361
2017-01-11
2017-01-11
2017-01-13
2017-01-13
2017-01-18
2017-01-17 00UEN
2016-10-31
2016-11-08
2017-01-02
2017-01-02
2017-01-12
2017-01-18 12UHA
2016-11-08
2016-11-08
2017-01-02
2017-01-02
2017-01-12
2017-01-18 21UHA
2016-12-21
2016-12-23
2017-01-10
2017-01-10
2017-01-20
2017-01-18 00
2016-12-21
2016-12-23
2017-01-11
2017-01-11
2017-01-21
2017-01-18 12UHA
2016-12-22
2016-12-23
2017-01-06
2017-01-07
2017-01-16
2017-01-18 11MKC
2016-12-22
2016-12-23
2017-01-06
2017-01-07
2017-01-16
2017-01-18 21MK
2016-10-31
2016-11-16
2017-01-12
2017-01-12
2017-01-22
2017-01-18 00
2017-01-07
2017-01-07
2017-01-10
2017-01-10
2017-01-15
2017-01-18 00
2016-12-22
2016-12-23
2017-01-06
2017-01-07
2017-01-16
2017-01-19 11XKA; 21XKA
2016-12-07
2016-12-07
2017-01-12
2017-01-12
2017-01-22
2017-01-20 2x
2017-01-13
2017-01-13
2017-01-15
2017-01-14
2017-01-20
2017-01-20 20MA
2017-01-13
2017-01-13
2017-01-14
2017-01-14
2017-01-19
2017-01-20 00C ; 31MB ; 41MB
2017-01-13
2017-01-13
2017-01-14
2017-01-15
2017-01-19
2017-01-20 11BAT
2016-11-28
2016-11-26
2017-01-15
2017-01-15
2017-01-25
2017-01-21 00
2016-11-28
2016-11-26
2017-01-15
2017-01-15
2017-01-25
2017-01-21 00
2016-12-22
2016-12-23
2017-01-06
2017-01-07
2017-01-16
2017-01-21 10EKH
2017-01-13
2017-01-13
2017-01-14
2017-01-14
2017-01-19
2017-01-21 42MBR
4671 Sea
2
23321,00
134 Shanghai
ALEXANDRIA
4675 Sea
12
165135,28
803 Shanghai
ALEXANDRIA
4691 Sea
2
31545,10
138 Shanghai
ALEXANDRIA
4673 Sea
5
29396,00
150 Antwerpen
ALEXANDRIA
4711 Sea
2
10010,00
43 Antwerpen
ALEXANDRIA
4818 Air
2
485,00
4 Malmö
CAIRO
4829 Air
1
104,20
0 Düsseldorf
CAIRO
4835 Air
2
17660,00
4656 Sea
1
10219,70
2936 Sea
1
2,55
0 Rotterdam
BURULLUS
4767 Sea
1
395000,00
240 Rotterdam
BURULLUS
2933 Sea
1
2,55
0 Rotterdam
BURULLUS
4547 Sea
1
395200,00
240 Rotterdam
BURULLUS
4646 Sea
4
62889,60
268 Shanghai
ALEXANDRIA
4663 Sea
3
28129,00
201 Shanghai
ALEXANDRIA
4652 Sea
4
52418,00
268 Shanghai
ALEXANDRIA
4650 Sea
2
12462,00
92 Ho Chi Minh Port
ALEXANDRIA
4599 Sea
6
26480,00
29 Ulsan
ALEXANDRIA
4687 Sea
2
157782,00
461 Banten
ALEXANDRIA
4740 Sea
2
18140,00
104 Hamburg
ALEXANDRIA
4726 Sea
3
227000,00
298 Am 3. May Shipyard
BURULLUS
254 Qingdao 76 Shanghai
CAIRO ALEXANDRIA
COSCO AFRICA #YMLUM2314 05026 COSCO AFRICA #YMLUM2314 04804 COSCO AFRICA #YMLUM2314 04805 NOMADIC BERGEN #006 NOMADIC BERGEN #005 KL8160/12 MP8140/16 #07450139740 AF341/13 AF570/14 #05752956256 VDA4558/21 #41201483510 COSCO AFRICA #YMLUM2314 04807 HOHE BANK #HOHE-ROTBUR-1B HOHE BANK #HOHE-ROTBUR-1A HOHE BANK #HOHE-ROTBUR-2B HOHE BANK #HOHE-ROTBUR-2A COSCO AFRICA #YMLUM2314 04806 COSCO AFRICA #YMLUM2314 04440 COSCO AFRICA #YMLUM2314 03683 YM IMAGE #YMLUM4903 01932 DA AN #ULSALX-4599 BBC ORINOCO #BANALE-001 MSC CHARLESTON #MSCURK638 287 SCHILLIG #SCHIL-RIJBUR-1
2016-12-07
2016-12-07
2017-01-12
2017-01-12
2017-01-22
2017-01-22 42UHA
2016-12-07
2016-12-07
2017-01-12
2017-01-12
2017-01-22
2017-01-22 11UHA
2016-12-09
2016-12-07
2017-01-12
2017-01-12
2017-01-22
2017-01-22 11UHA
2016-12-23
2016-12-23
2017-01-06
2017-01-07
2017-01-16
2017-01-22 20MA
2016-12-31
2016-12-23
2017-01-06
2017-01-07
2017-01-16
2017-01-22 10MKC
2017-01-12
2017-01-12
2017-01-16
2017-01-16
2017-01-21
2017-01-22 20PUR
2017-01-13
2017-01-13
2017-01-14
2017-01-15
2017-01-19
2017-01-22 12MBR
2017-01-21
2017-01-21
2017-01-22
2017-01-22
2017-01-27
2017-01-22 11MBL; 12MBL
2016-12-07
2016-12-07
2017-01-12
2017-01-12
2017-01-22
2017-01-22 31UHA
2017-01-06
2017-01-06
2017-01-22
2017-01-22
2017-02-01
2017-01-22 11MK
2017-01-06
2017-01-06
2017-01-22
2017-01-22
2017-02-01
2017-01-22 11MK
2017-01-06
2017-01-06
2017-01-22
2017-01-22
2017-02-01
2017-01-22 20MK
2017-01-06
2017-01-06
2017-01-22
2017-01-22
2017-02-01
2017-01-22 20MK
2016-12-07
2016-12-07
2017-01-12
2017-01-12
2017-01-22
2017-01-23 31UHA
2016-12-07
2016-12-07
2017-01-12
2017-01-12
2017-01-22
2017-01-23 41UHA
2016-12-07
2016-12-07
2017-01-12
2017-01-12
2017-01-22
2017-01-23 22UHA
2016-12-06
2016-12-06
2017-01-18
2017-01-18
2017-01-28
2017-01-24 22UHA
2016-12-11
2016-12-08
2017-01-17
2017-01-17
2017-01-27
2017-01-24 22UHA
2016-12-16
2016-12-20
2017-01-14
2017-01-13
2017-01-24
2017-01-24 30MA
2016-12-28
2016-12-28
2017-01-16
2017-01-16
2017-01-26
2017-01-24 00ABK
2017-01-10
2017-01-10
2017-01-24
2017-01-24
2017-02-03
2017-01-24 10BAT
4756 Sea
11
19699,00
220 Hamburg
ALEXANDRIA
4764 Sea
1
6136,00
38 Hamburg
ALEXANDRIA
4765 Sea
1
9835,00
77 Hamburg
ALEXANDRIA
35
143,45
4635 Sea
4
367000,00
630 Rotterdam
BURULLUS
4713 Sea
3
53900,00
90 Rotterdam
BURULLUS
4865 Air
2
7,88
0 Frankfurt
CAIRO
4883 Air
1
72,00
1 Frankfurt
CAIRO
4888 Air
7
976,00
5 Frankfurt
CAIRO
4875 Air
1
0,73
0 Prag
CAIRO
4889 Air
1
0,60
0 Frankfurt
CAIRO
2940 Air
1
3,00
0 Frankfurt
CAIRO
4670 Sea
6
11730,00
75 Santos
ALEXANDRIA
4695 Sea
64
81817,00
318 Hamburg
ALEXANDRIA
4633 Sea
17
24450,00
67 Busan
ALEXANDRIA
4634 Sea
11
154695,70
736 Busan
ALEXANDRIA
4654 Sea
2
23121,00
134 Shanghai
ALEXANDRIA
4884 Air
2
1460,00
10 Frankfurt
CAIRO
4689 Sea
1
8811,00
67 Busan
ALEXANDRIA
4651 Sea
26
234717,84
829 Busan
ALEXANDRIA
3569 Air
1 Jakarta
CAIRO
MSC CHARLESTON #MSCURK651 025 MSC CHARLESTON #MSCURK652 445 MSC CHARLESTON #MSCURK652 163 TK057/18 TK694/19 #23564428674 HOHE BANK #HOHE-ROTBUR-3 HOHE BANK #HOHE-ROTBUR-4 MS1520/20 MS541/21 #07790881383 AF341/20 AF570/21 #05752956271 MS1520/20 MS541/21 #07790881405 LH1397/20 LH8290/20 #02053562460 MS732/21 #07796229420 MS1520/20 MS541/21 #07796229416 MSC AMALFI #MSCUZS915 362 MSC CHARLESTON #MSCURK621 358 MSC GAIA #MSCUKU566 911 MSC RENEE #MSCUKU560 153 COSCO AMERICA # MS541/22 #07790881394 MSC CLORINDA #MSCUKU575 466 MSC CLORINDA #MSCUKU575 524
2016-12-28
2016-12-28
2017-01-16
2017-01-16
2017-01-26
2017-01-24 00
2016-12-28
2016-12-28
2017-01-16
2017-01-16
2017-01-26
2017-01-24 40URA
2016-12-28
2016-12-28
2017-01-16
2017-01-16
2017-01-26
2017-01-24 10EKH
2017-01-19
2017-01-19
2017-01-20
2017-01-20
2017-01-25
2017-01-24 30MA ; 40MA
2017-01-06
2017-01-06
2017-01-22
2017-01-22
2017-02-01
2017-01-25 10MA
2017-01-06
2017-01-06
2017-01-22
2017-01-22
2017-02-01
2017-01-25 10MA
2017-01-20
2017-01-20
2017-01-21
2017-01-22
2017-01-26
2017-01-25 22MB ; 32MB
2017-01-20
2017-01-20
2017-01-21
2017-01-21
2017-01-26
2017-01-25 22BAT
2017-01-20
2017-01-20
2017-01-21
2017-01-21
2017-01-26
2017-01-25 10MA
2017-01-20
2017-01-20
2017-01-21
2017-01-21
2017-01-26
2017-01-25 42MB
2017-01-21
2017-01-21
2017-01-21
2017-01-21
2017-01-26
2017-01-25 42MB
2017-01-20
2017-01-20
2017-01-21
2017-01-22
2017-01-26
2017-01-25 00MB
2016-12-07
2016-12-08
2017-01-10
2017-01-10
2017-01-20
2017-01-26 40URA
2016-12-18
2016-12-28
2017-01-16
2017-01-16
2017-01-26
2016-12-04
2016-12-04
2017-01-11
2017-01-11
2017-01-21
2017-01-26 00; 12; 2X; 32; 2017-01-27 20;
2016-11-27
2016-11-28
2017-01-11
2017-01-11
2017-01-21
2017-01-28 12UHA
2016-12-14
2016-12-14
2017-01-18
2017-01-18
2017-01-28
2017-01-28 41UHA
2017-01-22
2017-01-22
2017-01-22
2017-01-22
2017-01-27
2017-01-28 00EKH
2016-12-11
2016-12-11
2017-01-19
2017-01-19
2017-01-29
2017-01-29 12UHA
2016-12-11
2016-12-11
2017-01-19
2017-01-19
2017-01-29
2017-01-29 00
10BFT; 10MA ; 11; 11MK ; 12MKA; 1X; 20MA ; 21; 22; 2x; 30MKA; 30PGB; 31; 40PGB; 41; 42 21; 22
4812 Air
2
644,00
3 Denver
CAIRO
4886 Air
1
12,30
0 Frankfurt
CAIRO
4628 Sea
4
7476,00
4665 Sea
29
27180,00
4640 Sea
2
7108,00
4735 Sea
74
85802,20
451 Hamburg
ALEXANDRIA
4728 Sea
25
37029,00
246 Hamburg
ALEXANDRIA
4772 Sea
4
3762,00
19 Hamburg
ALEXANDRIA
4855 Air 4732 Sea
1 30
2000,00 8342,00
9 Frankfurt 22 Rotterdam
Cairo ALEXANDRIA
4882 Air
9
372,50
2 Frankfurt
CAIRO
4890 Air
1
2160,00
8 Frankfurt
CAIRO
4894 Air 4693 Air
3 4
159,00 1038,40
1 Frankfurt 6 Mumbai
Cairo CAIRO
4909 Air
1
260,00
1 Frankfurt
CAIRO
4683 Air 4859 Air
1 4
33,00 169,00
0 Hamburg 0 Düsseldorf
Cairo CAIRO
4847 Air
7
2428,00
5 Shanghai
CAIRO
4677 Sea
17
104665,25
4550 Sea
2
28033,30
4758 Sea
1
9444,00
57 Nhava Sheva
ALEXANDRIA
66 Busan
ALEXANDRIA
56 Nhava Sheva
ALEXANDRIA
398 Busan
ALEXANDRIA
134 Shanghai
ALEXANDRIA
67 Houston
ALEXANDRIA
KL612/20 MP8140/26 #07448921515 MS1520/24 MS541/25 #07796229431 MAERSK EUPHRATES #MAEU958809 563 MSC CLORINDA #MSCUKU575 490 MAERSK EUPHRATES #MAEU958809 563 MSC ANTIGUA #MSCURK690 056
2017-01-20
2017-01-20
2017-01-26
2017-01-26
2017-01-31
2017-01-29 11MB ; 12MB
2017-01-24
2017-01-24
2017-01-25
2017-01-25
2017-01-30
2017-01-29 22BAT
2016-11-18
2016-12-22
2017-01-14
2017-01-14
2017-01-24
2017-01-30 00
2016-12-11
2016-12-11
2017-01-19
2017-01-19
2017-01-29
2017-01-30 20; 21; 22
2016-12-22
2016-12-22
2017-01-15
2017-01-15
2017-01-25
2017-01-30 00
2017-01-04
2017-01-04
2017-01-23
2017-01-22
2017-02-02
MSC ANTIGUA #MSCURK642 651 MSC ANTIGUA #MSCURK664 515 MP8140/19 MSC ANTIGUA #MSCURK668 193 AF341M/26 AF570/27 #05752956304 KL8440/27 MP8910/30 #07453010473 MS9000/27 KU302/28 KU541/29 #22947981500 MS541/28 #07796229442 LH8290/31 TK1952/22 TK690/23 #23526905336 QR0871/28 QR1301/29 #15703881360 MSC LIVORNO #MSCUKU603 060 CSCL WINTER #YMLUM2313 87952 KOBE EXPRESS #HLCUHOU16 1260371
2017-01-04
2017-01-04
2017-01-23
2017-01-22
2017-02-02
2017-01-31 00C ; 01LD ; 10; 10EKH; 10LAC; 10LD ; 10MA ; 11; 11BBT; 11MK ; 12; 12MKA; 20MA ; 21; 21C ; 22; 3x 2017-01-31 00ABK; 01LD ; 10LCA; 10MA ; 11MK ; 12MB ; 12MKA; 2X
2017-01-04
2017-01-04
2017-01-23
2017-01-22
2017-02-02
2017-01-31 11MB ; 12MB
2017-01-18 2017-01-04
2017-01-04
2017-01-19 2017-01-23
2017-01-22
2017-02-02
2017-01-31 00ABA 2017-02-01 00; 10; 11; 12; 20; 21; 22
2017-01-26
2017-01-26
2017-01-30
2017-01-30
2017-02-04
2017-02-02 00EKH; 00UEN; 10C ; 11UBA; 12MB ; 42BAA; 42MPB
2017-01-27
2017-01-27
2017-01-30
2017-01-30
2017-02-04
2017-02-02 00EKH
2017-01-27 2017-01-28
2017-01-28
2017-01-27 2017-01-29
2017-01-29
2017-02-03
2017-02-02 00ABA 2017-02-02 00URA
2017-01-28
2017-01-28
2017-01-28
2017-01-28
2017-02-02
2017-02-02 00EKH
2017-01-31 2017-01-22
2017-01-22
2017-01-31 2017-01-26
2017-01-26
2017-01-31
2017-02-02 99UBA 2017-02-02 11UHA
2017-01-28
2017-01-28
2017-01-29
2017-01-29
2017-02-03
2017-02-02 00; 2x
2016-12-19
2016-12-18
2017-01-28
2017-01-25
2017-02-07
2017-02-03 00
2016-10-26
2016-10-26
2016-11-22
2016-11-22
2016-12-06
2017-02-03 11UHA
2017-01-02
2017-01-04
2017-01-29
2017-01-29
2017-02-08
2017-02-03 12UHA
4439 Sea
58
443768,69
6107 Shanghai
ALEXANDRIA
4725 Sea
2
27379,12
134 Shanghai
ALEXANDRIA
4870 Sea
6
7603,01
49 Rijeka
BURULLUS
4744 Sea
3
2357,00
20 Hamburg
ALEXANDRIA
3575 Sea
2
1040,00
3 Hamburg
ALEXANDRIA
3578 Sea
1
35,65
0 Rijeka
ALEXANDRIA
4779 Sea
39
36813,00
108 Hamburg
ALEXANDRIA
4845 Sea
6
127822,04
230 Hamburg
ALEXANDRIA
4631 Sea
2
43727,99
40 Mumbai
ALEXANDRIA
4688 Sea
14
25460,00
4910 Air
1
20,00
0 Düsseldorf
CAIRO
4903 Air
1
66,90
0 Düsseldorf
CAIRO
3581 Air
1
13,90
0 Frankfurt
CAIRO
4630 Sea
6
144987,00
643 Banten
ALEXANDRIA
4692 Sea
9
133774,83
622 Shanghai
ALEXANDRIA
4676 Sea
5
62519,75
335 Shanghai
ALEXANDRIA
4763 Sea
9
10907,79
4899 Air
15
4896 Air
229 Nhava Sheva
ALEXANDRIA
49 Rijeka
ALEXANDRIA
4397,63
31 Frankfurt
CAIRO
1
68,00
0 Frankfurt
CAIRO
4710 Sea
14
6078,00
4727 Sea
2
10400,00
19 Chennai
ALEXANDRIA
95 Hamburg
ALEXANDRIA
AROMA 2 #AM1601QDA LX01 CSCL BOHAI SEA #YMLUM2314 10221 ALTAIR MAERSK #SGL417274 MSC ALTAMIRA #MSCURK641 869 MSC ALTAMIRA #MSCURK754 431 ALTAIR MAERSK #SGL417274 RIO DE LA PLATA #SEJJSGL418 646 RIO DE LA PLATA #SGL419074 YM GREEN #YMLUM5020 00513 MEHUIN #AMC0516818
2016-11-28
2016-11-30
2017-01-25
2017-01-22
2017-02-04
2017-02-04 21MBL; 22MBL
2016-12-21
2016-12-22
2017-01-25
2017-01-25
2017-02-04
2017-02-04 22UHA
2017-01-14
2017-01-14
2017-02-25
2017-01-26
2017-03-07
2017-02-04 10BAT
2017-01-11
2017-01-12
2017-01-28
2017-01-28
2017-02-07
2017-02-04 12MBR
2017-01-11
2017-01-12
2017-01-28
2017-01-28
2017-02-07
2017-02-04 11MBL; 12MBL
2017-01-14
2017-01-14
2017-01-28
2017-01-26
2017-02-07
2017-02-04 10BAT
2017-01-18
2017-01-18
2017-01-28
2017-01-29
2017-02-07
2017-02-04 10MA ; 12MKA; 1X; 20; 20MA ; 21; 22; 2X; 31; 32; 3X; 3x
2017-01-18
2017-01-18
2017-01-28
2017-01-29
2017-02-07
2017-02-04 10BAT; 20BAT
2016-11-30
2016-12-02
2017-01-25
2017-01-25
2017-02-04
2017-02-05 00
2017-01-02
2017-01-04
2017-01-24
2017-01-24
2017-02-03
2017-02-05 30URA
AF341/30 AF670/31 #05752956326 MS1520/31 MS541/01 #07796229464 AF341/30 AF6740/01 #05752956315 BBC ORINOCO #BANALE-002 EVER UBERTY #YMLUM2314 08405 EVER UBERTY #YMLUM2314 08404 GUSTAV MAERSK #SGL417252 KL8440/03 MP8910/06 #07453010506 EK0393/04 EK0925/05 #17632227366 CMA CGM PUCCINI #AIS0207390 IMMENSITY #014
2017-01-30
2017-01-30
2017-02-01
2017-02-06
2017-02-05 00UEN
2017-01-31
2017-01-31
2017-02-01
2017-02-06
2017-02-05 42MBR
2017-02-07
2017-02-05 00C
2017-01-30
2017-02-01
2017-02-02
2016-12-12
2016-12-20
2017-01-12
2017-01-14
2017-01-22
2017-02-06 20MA
2016-12-14
2016-12-19
2017-02-04
2017-02-04
2017-02-14
2017-02-07 21UHA
2016-12-18
2016-12-19
2017-02-04
2017-02-04
2017-02-14
2017-02-07 21UHA
2017-01-08
2017-01-08
2017-01-26
2017-01-26
2017-02-05
2017-02-07 10BAT
2017-02-03
2017-02-03
2017-02-06
2017-02-06
2017-02-11
2017-02-08 00; 01LD ; 30MKA; 41MK ; 42MB ; 42MKA
2017-02-04
2017-02-04
2017-02-05
2017-02-05
2017-02-10
2017-02-08 42MBR
2017-01-11
2017-01-15
2017-02-07
2017-02-04
2017-02-17
2017-02-09 12UHA; 22UHA
2017-01-14
2017-01-14
2017-01-28
2017-01-31
2017-02-07
2017-02-09 00STG
2937 Sea
1
2,55
0 Blexen
BURULLUS
4839 Sea
1
395200,00
240 Blexen
BURULLUS
2938 Sea
6
7,39
0 Blexen
BURULLUS
2939 Sea
9
29527,61
44 Blexen
BURULLUS
4838 Sea
1
451255,00
441 Blexen
BURULLUS
4745 Sea
2
7250,00
4717 Sea
16
57260,00
87 Antwerpen
3573 Sea
2
134,60
4747 Sea
3
20820,00
4598 Sea
24
3086000,00
4684 Sea
8
13915,19
4757 Sea
6
96289,00
232 Antwerpen
ALEXANDRIA
4702 Sea
4
40253,60
461 Shanghai
ALEXANDRIA
4585 Sea
5
85493,10
339 Shanghai
ALEXANDRIA
4624 Sea
5
85493,10
339 Shanghai
ALEXANDRIA
4751 Sea
3
28249,00
201 Shanghai
ALEXANDRIA
4778 Sea
4
52433,00
268 Shanghai
ALEXANDRIA
4750 Sea
4
62929,60
268 Shanghai
ALEXANDRIA
4746 Sea 4777 Sea
24 75
100162,00 124944,00
367 Antwerpen 536 Hamburg
ALEXANDRIA ALEXANDRIA
4685 Sea
8
13915,19
4682 Sea
81
962450,81
4995 Laem Chabang ALEXANDRIA
4678 Sea
13
137257,16
969 Laem Chabang ALEXANDRIA
211 Chennai
1 Hamburg
42 Busan 6481 Ulsan 26 Chennai
26 Chennai
ALEXANDRIA ALEXANDRIA
ALEXANDRIA
ALEXANDRIA ALEXANDRIA ALEXANDRIA
ALEXANDRIA
ACCUM #ACCU-BLEBUR-2B ACCUM #ACCU-BLEBUR-2A ACCUM #ACCU-BLEBUR-1B ACCUM #ACCU-BLEBUR-1C ACCUM #ACCU-BLEBUR-1A IMMENSITY #012 MAERSK BENTONVILLE #SAFM769410 544 MSC TORONTO #MSCURK755 438 GERD MAERSK #959005177 DA AN #ULSALX-4598 WAN HAI 508 #YMLUM5150 68470 IMMENSITY #009 AROMA 2 #AM1601QDA LX01 INDUSTRIAL CAPE #IDMC112042 001 INDUSTRIAL CAPE #IDMC112042 002 COSCO TAICANG #YMLUM2314 12538 ITAL UNIVERSO #YMLUM2314 16111 ITAL UNIVERSO #YMLUM2314 17267 IMMENSITY # MSC TORONTO #MSCURK681 105 WAN HAI 508 #YMLUM5150 68471 BBC ORINOCO #LAEALE002 BBC ORINOCO #LAEALE001
2017-01-23
2017-01-24
2017-02-09
2017-02-09
2017-02-19
2017-02-09 12MKA
2017-01-24
2017-01-24
2017-02-09
2017-02-09
2017-02-19
2017-02-09 12MKA
2017-01-24
2017-01-24
2017-02-09
2017-02-09
2017-02-19
2017-02-09 12MB
2017-01-24
2017-01-24
2017-02-09
2017-02-09
2017-02-19
2017-02-09 12MB
2017-01-25
2017-01-24
2017-02-09
2017-02-09
2017-02-19
2017-02-09 12MB
2017-01-14
2017-01-14
2017-01-28
2017-01-31
2017-02-07
2017-02-09 10QU
2016-12-30
2017-01-01
2017-01-26
2017-01-26
2017-02-05
2017-02-10 11BAT; 12BAT
2017-01-18
2017-01-18
2017-02-05
2017-02-05
2017-02-15
2017-02-10 10BAA
2017-01-01
2017-01-01
2017-02-02
2017-02-02
2017-02-12
2017-02-10 10LCB
2016-12-03
2016-12-08
2017-01-17
2017-01-12
2017-01-27
2017-02-12 22UHA
2016-12-08
2016-12-19
2017-02-06
2017-02-06
2017-02-16
2017-02-12 12UHA
2017-01-14
2017-01-14
2017-01-28
2017-01-31
2017-02-07
2017-02-12 00ABK
2016-12-06
2016-11-30
2017-02-08
2017-02-08
2017-02-18
2017-02-13 21MBL; 22MBL
2016-12-17
2016-12-19
2017-01-30
2017-01-29
2017-02-09
2017-02-13 22UHA
2016-12-18
2016-12-19
2017-01-30
2017-01-29
2017-02-09
2017-02-13 31UHA
2016-12-28
2016-12-28
2017-02-06
2017-02-06
2017-02-16
2017-02-13 42UHA
2017-01-09
2017-01-09
2017-02-06
2017-02-06
2017-02-16
2017-02-13 31UHA
2017-01-09
2017-01-09
2017-02-06
2017-02-06
2017-02-16
2017-02-13 32UHA
2017-01-14 2017-01-18
2017-01-14 2017-01-18
2017-01-28 2017-02-04
2017-01-31 2017-02-05
2017-02-07 2017-02-14
2017-02-13 10LAC; 10PAC; 40 2017-02-13 00; 20MA ; 40URA
2016-12-08
2016-12-19
2017-02-06
2017-02-06
2017-02-16
2017-02-14 22UHA
2016-12-12
2016-12-12
2017-01-12
2017-01-14
2017-01-22
2017-02-14 32UHA
2016-12-12
2016-12-12
2017-01-12
2017-01-14
2017-01-22
2017-02-14 31UHA
4741 Sea
3
68517,00
104 Tianjin
ALEXANDRIA
4737 Sea
8
58021,86
254 Busan
ALEXANDRIA
4813 Sea
2
8200,00
46 Hamburg
ALEXANDRIA
4822 Sea
14
6181,00
19 Chennai
DAMIETTA
4895 Air
9
882,30
4 Frankfurt
4770 Sea
7
112835,80
469 Shanghai
ALEXANDRIA
4785 Sea
60
61406,30
296 Hamburg
ALEXANDRIA
4766 Sea
8
13915,19
27 Chennai
DAMIETTA
4781 Sea
8
13915,19
27 Chennai
DAMIETTA
4944 Air
1
18,00
4674 Sea
11
211594,00
803 Banten
ALEXANDRIA
4760 Sea
5
19260,84
74 Busan
ALEXANDRIA
4749 Sea
1
10059,70
76 Shanghai
ALEXANDRIA
4730 Sea
5
41246,40
335 Shanghai
ALEXANDRIA
4837 Sea
803 Hamburg
ALEXANDRIA
12
89275,00
4926 Air
2
2,65
3582 Air
2
376,00
4659 Sea
7
160148,00
4821 Sea
3
4761 Sea 4830 Sea
0 Düsseldorf
CAIRO
CAIRO
0 Prag
CAIRO
2 Amsterdam
CAIRO
230 Tianjin
ALEXANDRIA
41036,00
201 Rotterdam
ALEXANDRIA
39
22669,00
309 Hamburg
ALEXANDRIA
2
157782,00
461 Banten
ALEXANDRIA
CSCL MERCURY #COSU612835 9690 MSC TERESA #MSCUKU611 311 MSC TORONTO #MSCURK744 358 CMA CGM MOZART #AAK0119509 KL4080/30 MP8140/02 #07453010484 COSCO EUROPE #YMLUM2314 15665 MSC TORONTO #MSCURK775 311 CMA CGM MOZART #AAK0119535 CMA CGM MOZART #AAK0119535 OS710/09 OS683/10 #02053562574 BBC ORINOCO #BANALE-003 MSC AURORA #MSCUKU619 611 COSCO EUROPE #YMLUM2314 15646 EVER UNICORN #YMLUM2314 11078 RIO MADEIRA #SGL422796 OS712/07 OS863/08 #02053562552 MS1534/11 MS521/12 #07796391105 MSC AURORA #MSCUXD685 405 MSC MELISSA #MSCURK771 120 RIO MADEIRA #SGL420737 BBC MANITOBA #
2016-12-25
2016-12-26
2017-02-03
2017-02-03
2017-02-13
2017-02-14 00
2016-12-25
2016-12-26
2017-02-06
2017-02-06
2017-02-16
2017-02-14 00
2017-01-18
2017-01-18
2017-02-05
2017-02-05
2017-02-15
2017-02-14 11MB ; 12MB
2017-01-22
2017-01-22
2017-02-03
2017-02-04
2017-02-13
2017-02-14 31UHA
2017-01-30
2017-01-30
2017-02-02
2017-02-02
2017-02-07
2017-02-14 00C ; 30MKA; 32MB ; 42MB ; 42MBR; 42MKA
2016-12-28
2017-01-04
2017-02-06
2017-02-06
2017-02-16
2017-02-14 12UHA
2017-01-18
2017-01-18
2017-02-04
2017-02-05
2017-02-14
2017-02-14 10MA ; 10PGB; 11MB ; 12MB ; 20C ; 20MA ; 21; 21MB ; 22; 22MB ; 31; 32; 3x; 4x
2017-01-22
2017-01-22
2017-02-03
2017-02-04
2017-02-13
2017-02-14 31UHA
2017-01-22
2017-01-22
2017-02-03
2017-02-04
2017-02-13
2017-02-14 32UHA
2017-02-09
2017-02-09
2017-02-10
2017-02-10
2017-02-15
2017-02-14 00EKH
2016-12-16
2016-12-20
2017-01-12
2017-01-14
2017-01-22
2017-02-15 30MA
2016-12-31
2017-01-03
2017-02-06
2017-02-06
2017-02-16
2017-02-15 00
2017-01-04
2017-01-04
2017-02-06
2017-02-06
2017-02-16
2017-02-15 32UHA
2016-12-25
2016-12-25
2017-02-06
2017-02-06
2017-02-16
2017-02-16 21UHA
2017-01-25
2017-01-25
2017-02-04
2017-02-04
2017-02-14
2017-02-16 22UHA
2017-02-07
2017-02-07
2017-02-09
2017-02-09
2017-02-14
2017-02-16 31MB ; 41MB
2017-02-11
2017-02-11
2017-02-12
2017-02-13
2017-02-17
2017-02-16 11UHA
2016-12-29
2016-12-31
2017-02-06
2017-02-06
2017-02-16
2017-02-17 00
2017-01-20
2017-01-25
2017-02-05
2017-02-05
2017-02-15
2017-02-17 11UHA
2017-01-25
2017-01-25
2017-02-04
2017-02-04
2017-02-14
2017-02-17 10BAA
2017-01-22
2017-01-21
2017-02-09
2017-02-09
2017-02-19
2017-02-18 40MA
4840 Sea
92
22713,00
251 Hamburg
4929 Air
9
1276,90
5 Frankfurt
4759 Sea
4
57830,18
210 Nhava Sheva
ALEXANDRIA
4796 Sea
2
33729,42
65 Nhava Sheva
ALEXANDRIA
4849 Sea
10
27880,00
71 Gemlik
ALEXANDRIA
4916 Air
11
595,42
3 Frankfurt
4762 Sea
15
11933,00
124 Hamburg
4937 Air
2
485,00
4698 Sea
6
26480,00
4950 Air
2
16,00
4938 Air
1
0,30
4852 Sea
1
8130,00
33 Hamburg
ALEXANDRIA
4861 Sea
3
6150,00
27 Hamburg
ALEXANDRIA
4797 Sea
5
7702,50
31 Hamburg
ALEXANDRIA
4831 Sea
12
219550,00
824 Banten
ALEXANDRIA
4817 Sea
59
85350,00
294 Hamburg
ALEXANDRIA
4833 Sea
13
21500,00
105 Mumbai
ALEXANDRIA
4997 Air
1
100,00
4769 Sea
3
7292,00
4 Malmö
29 Ulsan
ALEXANDRIA
CAIRO
CAIRO
ALEXANDRIA
CAIRO
ALEXANDRIA
0 Düsseldorf
CAIRO
0 Prag
CAIRO
1 Köln 56 Nhava Sheva
CAIRO ALEXANDRIA
MSC BRUNELLA #MSCURK803 436 AF341M/10 AF570/12 #05752956330 MSC MAEVA #MSCUKD851 271 MSC MAEVA #MSCUKD850 869 MSC MIRELLA #MSCURK807 338 MS1520/07 MS541/08 #07796229475 MSC BRUNELLA #MSCURK754 803 KL9316/08 KL4834/09 MP8 #07450139913 HUANGHAI ADVANCE #ULS-ALX4698 MS1520/10 MS541/11 #07796229486 LH7435E/10 LH586/11 #02053562585 MSC BRUNELLA #MSCURK808 922 MSC BRUNELLA #MSCURK824 259 MSC ALGECIRAS #MSCURK840 909 BBC MANITOBA # MSC BRUNELLA #MSCURK816 081 MAERSK INDUS #959297220 MS541/22 #07796229523 MAERSK INDUS #NSAALY4274 263336
2017-01-25
2017-01-26
2017-02-12
2017-02-12
2017-02-22
2017-02-18 00
2017-02-10
2017-02-10
2017-02-12
2017-02-12
2017-02-17
2017-02-18 00EKH; 11CYE; 12CYE; 1X; 20MA ; 2X; 30MKA; 42MBR
2017-01-19
2017-01-18
2017-02-03
2017-02-03
2017-02-13
2017-02-19 00
2017-01-19
2017-01-18
2017-02-03
2017-02-03
2017-02-13
2017-02-19 00
2017-01-29
2017-01-28
2017-02-08
2017-02-08
2017-02-18
2017-02-19 3x
2017-02-07
2017-02-07
2017-02-08
2017-02-08
2017-02-13
2017-02-20 00; 10MA ; 11C ; 30MKA; 31MKA; 41MB ; 41MK ; 42MB
2017-01-25
2017-01-26
2017-02-12
2017-02-12
2017-02-22
2017-02-20 10BAA
2017-02-08
2017-02-08
2017-02-13
2017-02-13
2017-02-18
2017-02-20 30PUR
2016-12-26
2017-01-04
2017-02-13
2017-02-19
2017-02-23
2017-02-21 31UHA
2017-02-10
2017-02-10
2017-02-11
2017-02-11
2017-02-16
2017-02-21 00EKH; 10PAB
2017-02-10
2017-02-10
2017-02-11
2017-02-11
2017-02-16
2017-02-21 42BAA
2017-01-25
2017-01-25
2017-02-12
2017-02-12
2017-02-22
2017-02-22 12BAA
2017-01-25
2017-01-26
2017-02-12
2017-02-12
2017-02-22
2017-02-22 10LAC
2017-02-01
2017-02-01
2017-02-18
2017-02-19
2017-02-28
2017-02-23 11MBR
2017-01-22
2017-01-21
2017-02-09
2017-02-09
2017-02-19
2017-02-24 40MA
2017-01-25
2017-01-25
2017-02-12
2017-02-12
2017-02-22
2017-02-24 1X; 20; 20MA ; 21; 22; 2X; 30LBG; 31; 3X; 3x
2017-01-26
2017-01-25
2017-02-17
2017-02-17
2017-02-27
2017-02-24 10LCB
2017-02-22
2017-03-22
2017-02-22
2017-02-23
2017-02-27
2017-02-24 42MKA
2017-01-26
2017-01-26
2017-02-16
2017-02-17
2017-02-26
2017-02-24 00
4940 Air
12
7892,17
31 Frankfurt
CAIRO
2941 Air
2
3322,00
21 Düsseldorf
CAIRO
4956 Air
2
8746,00
6 Amsterdam
CAIRO
4955 Air
1
35,00
0 Amsterdam
CAIRO
2942 Air
1
28,00
0 Düsseldorf
CAIRO
4804 Sea
13
137257,16
4878 Sea
2
17417,00
134 Rotterdam
ALEXANDRIA
4658 Sea
4
61190,00
210 Nhava Sheva
ALEXANDRIA
4694 Sea
2
32572,66
105 Nhava Sheva
ALEXANDRIA
974 Laem Chabang ALEXANDRIA
4815 Sea
6
26480,00
4841 Sea
678
235157,20
29 Ulsan
4867 Sea
5
24645,00
148 Antwerpen
ALEXANDRIA
4920 Sea
1
19532,00
67 Rotterdam
ALEXANDRIA
4802 Sea
6
144985,00
3567 Sea
43
363,53
4834 Sea
1
25560,00
4700 Sea
6
19000,00
153 Hamburg
ALEXANDRIA
4811 Sea
8
46200,00
358 Antwerpen
ALEXANDRIA
4868 Sea
2
11112,00
79 Antwerpen
ALEXANDRIA
4975 Air
2
21,45
4967 Air
1
1342,00
2207 Hamburg
656 Banten 2 Hamburg 61 Ulsan
ALEXANDRIA ALEXANDRIA
ALEXANDRIA ALEXANDRIA ALEXANDRIA
0 Prag
CAIRO
4 Chennai
CAIRO
LH7119/18 LH8292/19 #02099051315 KL8440/14 MP8140/16 #07453010532 MP8140/16 #07454086793 MS758/16 #07796392085 MS1520/15 MS541/17 #07796229490 BBC MANITOBA #LAEALE001 MSC LORETTA #MSCURK859 639 APL HOLLAND #YMLUM5020 00521 MALLECO #YMLUM5020 00524 DA JI #ULSALX-4815 MSC BRUNELLA #MSCURK813 500 HS ROME #MSCURK828 672 HS ROME #MSCURK974 773 BBC MANITOBA # HS ROME #MSCURK754 977 DA JI #ULSALX-4834 MSC BRUNELLA #MSCURK543 412 MSC ALGECIRAS #MSCURK783 612 HS ROME #MSCURK828 805 LH4731S/20 LH8290/21 #02074986096 SV779/23 SV307/24 #06527593834
2017-02-17
2017-02-17
2017-02-19
2017-02-19
2017-02-24
2017-02-24 1X; 2X; 31C ; 31MB ; 41MB ; 99UBA
2017-02-14
2017-02-14
2017-02-16
2017-02-16
2017-02-21
2017-02-24 10MA
2017-02-16
2017-02-16
2017-02-16
2017-02-16
2017-02-21
2017-02-24 31UHA
2017-02-16
2017-02-16
2017-02-16
2017-02-16
2017-02-21
2017-02-24 00UEN
2017-02-15
2017-02-15
2017-02-17
2017-02-17
2017-02-22
2017-02-24 10MA
2017-01-15
2017-01-16
2017-02-09
2017-02-09
2017-02-19
2017-02-25 32UHA
2017-01-30
2017-01-30
2017-02-12
2017-02-12
2017-02-22
2017-02-25 11UHA
2016-12-16
2016-12-16
2017-02-16
2017-02-15
2017-02-26
2017-02-26 00
2016-12-23
2016-12-23
2017-02-16
2017-02-15
2017-02-26
2017-02-26 00
2017-01-18
2017-01-23
2017-02-21
2017-02-16
2017-03-03
2017-02-26 32UHA
2017-01-25
2017-01-26
2017-02-12
2017-02-12
2017-02-22
2017-02-26 00
2017-02-04
2017-02-05
2017-02-18
2017-02-19
2017-02-28
2017-02-26 10PAC
2017-02-06
2017-02-06
2017-02-18
2017-02-19
2017-02-28
2017-02-26 12UHA
2017-01-22
2017-01-21
2017-02-09
2017-02-09
2017-02-19
2017-02-26 30MA
2017-02-01
2017-02-05
2017-02-19
2017-02-19
2017-03-01
2017-02-26 00ABK; 10MA ; 11MK ; 12MKA; 30MKA
2017-01-15
2017-01-23
2017-02-21
2017-02-16
2017-03-03
2017-02-27 10PAC
2017-01-25
2017-01-26
2017-02-12
2017-02-12
2017-02-22
2017-02-27 22UHA
2017-02-01
2017-02-01
2017-02-18
2017-02-19
2017-02-28
2017-02-27 11MB ; 12MB
2017-02-04
2017-02-05
2017-02-18
2017-02-19
2017-02-28
2017-02-27 10PAC
2017-02-20
2017-02-20
2017-02-22
2017-02-22
2017-02-27
2017-02-27 32MB
2017-02-23
2017-02-26
2017-02-24
2017-02-26
2017-03-01
2017-02-27 11UHA
4970 Air
5
1494,90
4 Frankfurt
CAIRO
5017 Air
2
680,00
3 Frankfurt
CAIRO
4784 Sea
5
41606,40
335 Shanghai
4941 Air
1
286,00
4945 Air
1
1,00
3584 Air
14
119,90
3583 Air
8
5,80
4978 Air
1
249,00
4887 Air
3
4835,00
4985 Air
1
4708,00
4957 Air
19
12333,69
4799 Sea
5
41246,40
4806 Sea
81
966069,63
4863 Sea
5
123881,00
4876 Sea
10
50851,06
5007 Air
1
3,30
4981 Air
1
10,50
4823 Sea
2
12430,00
92 Ho Chi Minh
ALEXANDRIA
4866 Sea
2
12480,00
92 Ho Chi Minh Port
ALEXANDRIA
4901 Sea
1
6000,00
70 Hamburg
ALEXANDRIA
4908 Sea
1
8295,00
77 Hamburg
ALEXANDRIA
ALEXANDRIA
1 Incheon
CAIRO
0 Wien
CAIRO
1 Düsseldorf
CAIRO
0 Budapest
CAIRO
2 Leipzig
CAIRO
16 Busan 2 Amsterdam 21 Düsseldorf
335 Shanghai
CAIRO CAIRO CAIRO
ALEXANDRIA
5015 Laem Chabang ALEXANDRIA 188 Tianjin
86 Antwerpen
ALEXANDRIA
ALEXANDRIA
0 Leipzig
CAIRO
0 Wien
CAIRO
MS1520/23 MS541/24 #07796229512 MS1520/24 MS541/25 #07796229560 EVER LYRIC #YMLUM2314 21672 OZ747/15 EY431/16 EY653 #60773529326 MS798/16 #07792597540 AF341/23 AF6752/25 #05752956352 TK1036 TK0690 #23562681146 MS1597/17 MS541/19 # CV6919/18 #17219362265 MP8910/23 #07454863071 LH7105/20 LH8290/21 #02099051326 EVER LYRIC #YMLUM2314 21697 BBC MANITOBA #LAEALE002 COSCO NETHERLANDS #COSU612836 9540 HS ROME #MSCURK865 187 MS1597/24 MS541/26 #07796229556 MS798/24 #07792597691 YM HORIZON #YMLUM4903 02723 YM HORIZON #YMLUM4903 02720 MSC BILBAO #MSCURK926 989 MSC BILBAO #MSCURK952 944
2017-02-23
2017-03-23
2017-02-24
2017-02-25
2017-03-01
2017-02-27 00; 00C ; 22MK ; 32MKA; 41MK
2017-02-25
2017-02-25
2017-02-25
2017-02-26
2017-03-02
2017-02-27 42MB
2017-01-22
2017-01-25
2017-02-23
2017-02-25
2017-03-05
2017-02-27 11UHA
2017-02-15
2017-02-15
2017-02-17
2017-02-17
2017-02-22
2017-02-27 00
2017-02-16
2017-02-16
2017-02-16
2017-02-18
2017-02-21
2017-02-27 99UBA
2017-02-23
2017-02-23
2017-02-25
2017-02-26
2017-03-02
2017-02-27 00ABK; 11MBR; 12MBR; 20MA ; 40MKA
2017-02-24
2017-02-24
2017-02-25
2017-02-26
2017-03-02
2017-02-27 30MA ; 40MA
2017-02-18
2017-02-18
2017-02-19
2017-02-18
2017-02-24
2017-02-28 00EKH
2017-02-18
2017-02-18
2017-02-21
2017-02-21
2017-02-26
2017-02-28 00
2017-02-23
2017-02-23
2017-02-23
2017-02-23
2017-02-28
2017-02-28 31UHA
2017-02-20
2017-02-18
2017-02-22
2017-02-22
2017-02-27
2017-02-28 00BZK; 00MK ; 11C ; 12MB ; 1X; 22MB ; 31MB ; 41MB
2017-01-22
2017-01-25
2017-02-23
2017-02-25
2017-03-05
2017-02-28 12UHA
2017-01-15
2017-01-16
2017-02-09
2017-02-09
2017-02-19
2017-03-01 41UHA
2017-01-23
2017-01-23
2017-02-24
2017-02-24
2017-03-06
2017-03-01 00
2017-02-04
2017-02-05
2017-02-18
2017-02-19
2017-02-28
2017-03-01 12MB
2017-02-24
2017-02-27
2017-02-27
2017-02-27
2017-03-04
2017-03-01 00EKH
2017-02-24
2017-02-24
2017-02-24
2017-02-24
2017-03-01
2017-03-01 00UEN
2017-01-31
2017-01-31
2017-02-24
2017-02-24
2017-03-06
2017-03-02 31UHA
2017-01-31
2017-01-31
2017-02-24
2017-02-24
2017-03-06
2017-03-02 32UHA
2017-02-08
2017-02-11
2017-02-25
2017-02-25
2017-03-07
2017-03-02 00ABK
2017-02-08
2017-02-11
2017-02-25
2017-02-25
2017-03-07
2017-03-02 10UBA
4989 Air
10
8734,50
15 Frankfurt
CAIRO
4853 Sea
1
11640,00
96 Hamburg
ALEXANDRIA
4854 Sea
5
67660,00
482 Hamburg
ALEXANDRIA
4858 Sea
3
42680,00
289 Hamburg
ALEXANDRIA
3580 Sea
9
6309,00
12 Hamburg
ALEXANDRIA
4931 Air
2
3284,00
26 Incheon
CAIRO
4729 Sea
4
367000,00
4742 Sea
8
5273,20
4885 Sea
3
53881,00
4699 Sea
24
3086000,00
4902 Sea
3
7292,00
4987 Air
2
1780,00
5023 Air
2
3572 Sea
630 Rotterdam
BURULLUS
8 Laem Chabang ALEXANDRIA 90 Rotterdam 6570 Ulsan
56 Nhava Sheva
BURULLUS ALEXANDRIA
ALEXANDRIA
4 Prag
CAIRO
680,00
3 Frankfurt
CAIRO
16
687,83
4 Hamburg
ALEXANDRIA
4857 Sea
9
158473,00
4827 Sea
1
14776,00
67 Busan
ALEXANDRIA
4881 Sea
2
12600,00
86 Hamburg
ALEXANDRIA
4998 Air
1
125,00
0 Frankfurt
CAIRO
2945 Air
1
25,00
0 Frankfurt
CAIRO
4828 Sea
5
40886,00
335 Busan
ALEXANDRIA
4775 Sea
11
146933,00
736 Busan
ALEXANDRIA
472 Nhava Sheva
DAMIETTA
LH7105S/27 LH8290/28 #02099051363 MSC BILBAO #MSCURK933 423 MSC BILBAO #MSCURK931 575 MSC BILBAO #MSCURK900 372 MSC BILBAO #MSCURK859 529 CV6916/25 #17219362361 SCHILLIG #SCHI-ROTBUR-1 MSC REUNION #MSCUW7203 778 SCHILLIG #SCHIL-ROTBUR-2 HUANGHAI ADVANCE #ULS-ALX4699 CHARLOTTE SCHULTE #SAFM769481 302 RFS MS0541 #07796429804 LH8290/02 #02099051411 MSC BILBAO #MSCURK894 898 CMA CGM MOZART #CAD0285529 MSC ROSA M #MSCKU6409 06 MSC BILBAO #MSCURK872 480 LH8290/02 #02099051396 MS1520/02 MS541/03 #07796229545 MSC ROSA M #MSCUKU640 971 MSC ROSA M #MSCUKU641 078
2017-02-27
2017-02-27
2017-02-28
2017-02-28
2017-03-05
2017-03-02 00BZK; 2X; 30MKA; 31; 31MKA; 32; 32MKA; 42MKA
2017-02-08
2017-02-11
2017-02-25
2017-02-25
2017-03-07
2017-03-02 10UBA
2017-02-08
2017-02-11
2017-02-25
2017-02-25
2017-03-07
2017-03-02 10UBA
2017-02-08
2017-02-11
2017-02-25
2017-02-25
2017-03-07
2017-03-02 10UBA; 11UBA; 12UBA
2017-02-08
2017-02-11
2017-02-25
2017-02-25
2017-03-07
2017-03-02 40URA
2017-02-25
2017-02-25
2017-02-28
2017-02-28
2017-03-05
2017-03-02 00
2017-02-16
2017-02-13
2017-03-04
2017-03-04
2017-03-13
2017-03-03 20MA
2017-01-27
2017-01-28
2017-02-25
2017-02-24
2017-03-07
2017-03-03 42MBR
2017-02-16
2017-02-13
2017-03-03
2017-03-04
2017-03-13
2017-03-04 20MA
2016-12-26
2017-01-04
2017-02-13
2017-02-19
2017-02-23
2017-03-05 31UHA
2017-02-08
2017-02-09
2017-02-23
2017-02-23
2017-03-05
2017-03-05 00
2017-02-22
2017-02-26
2017-02-24
2017-02-27
2017-03-01
2017-03-05 11MB ; 12MB
2017-03-02
2017-03-02
2017-03-02
2017-03-03
2017-03-07
2017-03-05 42MB
2017-02-08
2017-02-11
2017-02-25
2017-02-25
2017-03-07
2017-03-05 00BTA; 10BTA; 10UBA; 12MKA; 30MKA
2017-02-05
2017-02-08
2017-02-15
2017-02-15
2017-02-25
2017-03-05 00
2017-01-22
2017-01-22
2017-02-25
2017-02-27
2017-03-07
2017-03-06 11UHA
2017-02-11
2017-02-11
2017-02-28
2017-02-25
2017-03-10
2017-03-06 11BAC; 12BAC
2017-03-02
2017-03-02
2017-03-03
2017-03-03
2017-03-08
2017-03-06 20EKH
2017-03-02
2017-03-02
2017-03-03
2017-03-03
2017-03-08
2017-03-06 00MB
2017-01-22
2017-01-22
2017-02-25
2017-02-27
2017-03-07
2017-03-07 11UHA
2017-01-22
2017-01-22
2017-02-25
2017-02-27
2017-03-07
2017-03-07 22UHA
4877 Sea
69
104418,00
367 Hamburg
ALEXANDRIA
MSC BILBAO #MSCURK894 039
2017-02-08
2017-02-11
2017-02-25
2017-02-25
2017-03-07
0 Charlotte
CAIRO
2017-03-01
2017-03-01
2017-03-03
2017-03-03
2017-03-08
62 Düsseldorf
CAIRO
QR0714/01 QR1303/03 #15704926585 MS1520/02 MS541/03 #07796229582 MS798/03 #07792597993 TK0690/03 #23561170476 MSC BILBAO #MSCURK894 229 MSC ROSA M #MSCUKU641 193 CMA CGM NERVAL #CAD0287204 CMA CGM NERVAL #CAD0287201 RIO DE LA PLATA #SGL429329 LH8290/07 #02099051444 MSC CHLOE #MSCURK975 432 MSC CHLOE #MSCURK935 063 MSC CHLOE #MSCURK976 687
2017-03-07 00; 10BAB; 10LBF; 10MA ; 11BAB; 11BFT; 12BAB; 12BFT; 12BJT; 1X; 20; 20BAB; 20BFT; 20MA ; 21; 22; 2X; 30; 30BFT; 31; 32; 3X; 40; 40BFT; 41; 42; 4x; 99BZK 2017-03-08 31MKA
4996 Air
1
10,00
5008 Air
9
8750,50
2017-03-02
2017-03-02
2017-03-03
2017-03-03
2017-03-08
2017-03-08 41MB
5027 Air
1
0,80
0 Wien
CAIRO
2017-03-03
2017-03-03
2017-03-03
2017-03-03
2017-03-08
2017-03-08 99UBA
5003 Air
1
678,00
0 Izmir
CAIRO
2017-03-03
2017-03-03
2017-03-03
2017-03-03
2017-03-08
2017-03-08 00URA
4856 Sea
57
84612,70
2017-02-08
2017-02-11
2017-02-25
2017-02-25
2017-03-07
2017-01-22
2017-01-22
2017-02-25
2017-02-27
2017-03-07
2017-03-08 10LAC; 11C ; 12MB ; 1X; 20LBF; 20MA ; 30; 31; 32; 3X; 40; 40MA ; 41; 42 2017-03-09 00
4825 Sea
35
343027,25
4900 Sea
3
48815,00
157 Nhava Sheva
DAMIETTA
2017-02-20
2017-02-20
2017-03-01
2017-03-02
2017-03-11
2017-03-09 00
4906 Sea
1
9815,00
52 Nhava Sheva
DAMIETTA
2017-02-20
2017-02-20
2017-03-01
2017-03-02
2017-03-11
2017-03-09 00
4880 Sea
6
127982,04
230 Hamburg
2017-02-22
2017-02-21
2017-03-04
2017-03-04
2017-03-14
2017-03-09 11BAT; 12BAT
5053 Air
1
125,00
1 Frankfurt
CAIRO
2017-03-07
2017-03-07
2017-03-07
2017-03-08
2017-03-12
2017-03-09 42MKA
4925 Sea
1
964,00
3 Hamburg
ALEXANDRIA
2017-02-15
2017-02-16
2017-03-04
2017-03-05
2017-03-14
2017-03-09 42CYE
4912 Sea
12
60749,00
102 Budapest
ALEXANDRIA
2017-02-15
2017-02-16
2017-03-04
2017-03-05
2017-03-14
2017-03-12 30MA
4898 Sea
69
79708,47
355 Hamburg
ALEXANDRIA
2017-02-15
2017-02-16
2017-03-04
2017-03-05
2017-03-14
CAIRO
MS1520/02 MS541/04 #07796229593
2017-03-03
2017-03-03
2017-03-05
2017-03-05
2017-03-10
6314 Shanghai
ALEXANDRIA
2017-01-15
2017-01-19
2017-02-18
2017-02-23
2017-02-28
153 Hamburg
ALEXANDRIA
2017-02-15
2017-02-16
2017-03-04
2017-03-05
2017-03-14
2017-03-12 31UHA
7092,60
20 Hamburg
ALEXANDRIA
2017-02-15
2017-02-16
2017-03-04
2017-03-05
2017-03-14
2017-03-13 10PGB
28
15487,00
25 Hamburg
ALEXANDRIA
2017-02-15
2017-02-16
2017-03-04
2017-03-05
2017-03-14
2017-03-13 10BTA; 12BTA
4873 Sea
15
11933,00
124 Hamburg
ALEXANDRIA
2017-02-15
2017-02-16
2017-03-04
2017-03-05
2017-03-14
2017-03-14 20BAA
4722 Sea
2
370000,00
312 Rotterdam
BURULLUS
VENTURE DYLAN # MSC CHLOE #MSCURK871 110 MSC CHLOE #MSCURU014 271 MSC CHLOE #MSCURK985 597 MSC CHLOE #MSCURK900 869 MILADY #MILA-ROTBUR-1
2017-03-12 10C ; 11MB ; 12MB ; 12MKA; 1X; 20LCL; 20MA ; 22; 2X; 30; 30MA ; 30MKA; 31; 32; 3X; 40; 40MKA; 41; 42 2017-03-12 00; 00BZK; 00EKH; 00MK ; 10; 10MA ; 12MB ; 1X; 20; 22MB ; 2X; 30; 31MB ; 31MKA; 32MB ; 32MKA; 40; 41MK ; 42MB ; 42MKA; 42UBA 2017-03-12 11MBL; 12MBL
5001 Air
31
4956,42
4790 Sea
60
466362,28
4846 Sea
6
19000,00
4922 Sea
3
3585 Sea
2017-02-15
2017-02-24
2017-03-14
2017-03-15
2017-03-24
2017-03-14 11BAT; 12BAT
384 Hamburg 1142 Busan
16 Düsseldorf
ALEXANDRIA ALEXANDRIA
ALEXANDRIA
4891 Sea
24
188522,00
2031 Hamburg
ALEXANDRIA
3579 Sea
2
134,60
1 Hamburg
ALEXANDRIA
4958 Sea
2
38356,00
134 Rotterdam
ALEXANDRIA
4907 Sea
204
198524,00
418 Hamburg
ALEXANDRIA
4904 Sea
3
4600,00
16 Hamburg
ALEXANDRIA
5018 Air
10
7895,70
20 Düsseldorf
CAIRO
5044 Air
1
340,00
1 Frankfurt
CAIRO
4892 Sea
1
7575,00
58 Antwerpen
ALEXANDRIA
4708 Sea
4
34530,00
181 Antwerpen
ALEXANDRIA
5029 Air
2
485,00
5038 Air
1
5062 Air
4 Malmö
CAIRO
10,00
0 Charlotte
CAIRO
1
11,60
0 Frankfurt
CAIRO
5055 Air
1
170,00
1 Frankfurt
CAIRO
5040 Air
1
50,00
1 Amsterdam
CAIRO
5057 Air 2948 Air
1 2
1165,00 3232,90
2 Amsterdam 20 Frankfurt
CAIRO CAIRO
2947 Air
2
1404,00
7 Frankfurt
CAIRO
4973 Sea
3
35903,00
4939 Sea
1
4683,31
4936 Sea
3
227000,00
4814 Sea
24
3086000,00
4988 Sea
4
65363,00
268 Rotterdam
ALEXANDRIA
4994 Sea
2
33505,00
134 Rotterdam
ALEXANDRIA
201 Rotterdam
ALEXANDRIA
38 Hamburg
ALEXANDRIA
298 Rijeka 6480 Ulsan
BURULLUS ALEXANDRIA
MSC CHLOE #MSCURK953 132 MSC CHLOE #MSCURK903 095 KATHERINE #MSCURU054 020 MSC CHLOE #MSCURK936 509 MSC CHLOE #MSCURK969 971 MS1520/06 MS541/08 #07796229604 MS1584/10 MS541/10 #07796229626 BBC BANGKOK #019 BBC BANGKOK #020 AF123/07 AF6752/11 #05757497624 QR0714/09 QR1301/11 # MS1520/10 MS541/12 #07796229674 MS1584/10 MS541/10 #07796229652 MS1584/10 MS541/10 # MP8910/13 # KL8440/10 MP8910/13 #07453010576 MS1584/10 MS541/10 #07796229615 MSC MELISSA #MSCURU093 911 MSC PARIS #MSCURU025 525 SCHILLPLATE #SCHIL-RIJBUR-1 DA JI #ULSALX-4814 MSC MELISSA #MSCURU109 477 MSC MELISSA #MSCURU125 242
2017-02-15
2017-02-16
2017-03-04
2017-03-05
2017-03-14
2017-03-14 11MBL; 12MBL
2017-02-15
2017-02-16
2017-03-04
2017-03-05
2017-03-14
2017-03-14 20BAA
2017-02-20
2017-02-20
2017-03-04
2017-03-05
2017-03-14
2017-03-14 11UHA
2017-02-15
2017-02-16
2017-03-04
2017-03-05
2017-03-14
2017-03-15 00
2017-02-15
2017-02-16
2017-03-04
2017-03-05
2017-03-14
2017-03-15 10PAA
2017-03-06
2017-03-06
2017-03-08
2017-03-08
2017-03-13
2017-03-15 00C ; 00MA ; 11C ; 1X; 2X
2017-03-07
2017-03-07
2017-03-08
2017-03-08
2017-03-13
2017-03-15 42MB
2017-02-10
2017-02-14
2017-02-28
2017-03-06
2017-03-10
2017-03-16 11MBL
2017-02-10
2017-02-14
2017-02-28
2017-03-06
2017-03-10
2017-03-16 10MA ; 20MA ; 30MA
2017-03-08
2017-03-08
2017-03-12
2017-03-12
2017-03-17
2017-03-17 30PUR
2017-03-09
2017-03-09
2017-03-11
2017-03-11
2017-03-16
2017-03-17 32MKA
2017-03-10
2017-03-10
2017-03-12
2017-03-12
2017-03-17
2017-03-17 10PAB
2017-03-10
2017-03-10
2017-03-10
2017-03-12
2017-03-15
2017-03-17 21MB
2017-03-10
2017-03-10
2017-03-10
2017-03-10
2017-03-15
2017-03-17 00UEN
2017-03-13 2017-03-10
2017-03-13 2017-03-10
2017-03-14 2017-03-14
2017-03-14 2017-03-14
2017-03-19 2017-03-19
2017-03-17 42UHA 2017-03-17 20MA
2017-03-10
2017-03-10
2017-03-10
2017-03-11
2017-03-15
2017-03-17 00MK
2017-02-27
2017-02-26
2017-03-13
2017-03-13
2017-03-23
2017-03-18 11UHA
2017-02-22
2017-02-22
2017-03-13
2017-03-13
2017-03-23
2017-03-18 10UBA
2017-03-15
2017-03-11
2017-03-17
2017-03-19
2017-03-27
2017-03-18 20BAT
2017-01-18
2017-01-23
2017-02-21
2017-02-21
2017-03-03
2017-03-19 32UHA
2017-02-27
2017-02-26
2017-03-13
2017-03-13
2017-03-23
2017-03-19 11UHA
2017-02-27
2017-02-26
2017-03-13
2017-03-13
2017-03-23
2017-03-19 11UHA
5024 Air
2
506,00
2 Prag
CAIRO
5026 Air
1
1,00
0 Prag
CAIRO
5039 Air
8
3133,45
8 Düsseldorf
CAIRO
5059 Air
1
350,00
1 Istanbul
CAIRO
4848 Sea
17
24450,00
4932 Sea
37
42148,00
4935 Sea
1
2943 Sea
67 Busan
ALEXANDRIA
168 Hamburg
ALEXANDRIA
451255,00
452 Blexen
ALEXANDRIA
6
7,39
0 Blexen
ALEXANDRIA
3592 Air
1
22,70
5069 Air
1
2,00
0 Düsseldorf
4965 Sea
31
8368,00
19 Antwerpen
4974 Sea
6
70500,00
301 Blexen
ALEXANDRIA
4921 Sea
2
69000,00
356 Antwerpen
ALEXANDRIA
4874 Sea
ALEXANDRIA
0 Port of Export CAIRO
CAIRO
ALEXANDRIA
39
22669,00
309 Hamburg
5061 Air
3
1020,00
4 Frankfurt
4752 Sea
5
85493,10
339 Shanghai
ALEXANDRIA
4951 Sea
12
89355,00
803 Hamburg
ALEXANDRIA
4928 Sea
2
10600,00
88 Hamburg
ALEXANDRIA
2944 Sea
9
30027,61
44 Blexen
ALEXANDRIA
4810 Sea
2
27517,42
4897 Sea
1
8636,00
4919 Sea
59
94227,32
CAIRO
138 Shanghai
ALEXANDRIA
67 Houston
ALEXANDRIA
336 Hamburg
ALEXANDRIA
LH7431S/06 LH8290/07 #02074986284 LH7431S/06 LH8290/07 #02074986310 MS1520/09 MS541/10 # MB200/12 #71699893013 MSC LA SPEZIA #MSCUKU652 398 MSC PARIS #MSCURU068 731 NORDERSAND #NORD-BLEBUR-1A NORDERSAND #NORD-BLEBUR-1B LH7431S/08 LH8290/09 #02074986321 LH7105/13 LH8290/14 #02099051470 MSC MELISSA #MSCURU085 644 NORDERSAND #NORD-BLEBUR-5 NORDERSAND #NORD-BLEBUR-3 RIO MADEIRA #SGL430140 LH8290/16 #02099051481 VENTURE DYLAN # MSC PARIS #MSCURU051 307 NORDERSAND #NORD-BLEBUR-4 NORDERSAND #NORD-BLEBUR-1C MSC ROSA M #MSCUU9265 432 DUBAI EXPRESS #HLCUHOU17 0209775 MSC PARIS #MSCURU020 724
2017-03-06
2017-03-07
2017-03-08
2017-03-13
2017-03-13
2017-03-19 41BAA
2017-03-06
2017-03-06
2017-03-08
2017-03-15
2017-03-13
2017-03-19 41BAA
2017-03-08
2017-03-09
2017-03-10
2017-03-11
2017-03-15
2017-03-19 10MA ; 12UBA; 1X; 2X; 31MB
2017-03-12
2017-03-12
2017-03-12
2017-03-12
2017-03-17
2017-03-19 10SGC
2017-01-29
2017-01-31
2017-03-14
2017-03-15
2017-03-24
2017-03-19 30; 31; 32
2017-02-22
2017-02-22
2017-03-13
2017-03-13
2017-03-23
2017-03-01
2017-03-02
2017-03-18
2017-03-20
2017-03-28
2017-03-19 10C ; 10PDB; 11C ; 12C ; 12UBA; 1X; 2X; 30MA ; 30MKA; 31; 32; 3X; 40MKA 2017-03-19 11MB
2017-03-01
2017-03-02
2017-03-20
2017-03-20
2017-03-30
2017-03-19 11MB
2017-03-08
2017-03-08
2017-03-10
2017-03-13
2017-03-15
2017-03-19 41BAA
2017-03-13
2017-03-13
2017-03-14
2017-03-15
2017-03-19
2017-03-19 00EKH
2017-02-25
2017-02-28
2017-03-13
2017-03-13
2017-03-23
2017-03-20 00; 11; 12; 20; 21; 22; 30; 31; 32
2017-03-01
2017-03-02
2017-03-18
2017-03-20
2017-03-28
2017-03-20 21MB ; 22MB
2017-03-01
2017-03-02
2017-03-20
2017-03-20
2017-03-30
2017-03-20 11MB ; 12MB
2017-03-01
2017-03-01
2017-03-13
2017-03-13
2017-03-23
2017-03-20 20BAA
2017-03-16
2017-03-16
2017-03-16
2017-03-17
2017-03-21
2017-03-20 11MB ; 12MB ; 21MB
2017-01-15
2017-01-19
2017-02-23
2017-02-23
2017-03-05
2017-03-20 32UHA
2017-02-22
2017-02-22
2017-03-13
2017-03-13
2017-03-23
2017-03-20 31UHA
2017-03-01
2017-03-02
2017-03-18
2017-03-20
2017-03-28
2017-03-20 21MB ; 22MB
2017-03-01
2017-03-02
2017-03-20
2017-03-20
2017-03-30
2017-03-20 11MB
2017-01-26
2017-01-30
2017-03-14
2017-03-14
2017-03-24
2017-03-21 31UHA
2017-02-05
2017-02-11
2017-03-15
2017-03-15
2017-03-25
2017-03-21 22UHA
2017-02-22
2017-02-22
2017-03-13
2017-03-13
2017-03-23
2017-03-21 00URA; 10C ; 10LDK; 11MB ; 11UBA; 12MB ; 12UBA; 20LDK; 20MA ; 30MA ; 30MKA; 31; 32; 3X; 40LCA; 41; 42; 4x
5047 Air
1
9,00
0 Charlotte
CAIRO
5054 Air
1
134,80
0 Dubai
CAIRO
5050 Air
13
1776,71
6 Düsseldorf
CAIRO
4948 Sea
4
59620,00
3593 Air
1
127,00
5068 Air
1
1,86
5070 Air
5
156,95
4836 Sea
4
55789,62
4966 Sea
8
47700,59
79 Antwerpen
ALEXANDRIA
4984 Sea
1
7575,00
58 Antwerpen
ALEXANDRIA
4787 Sea
4
1586,00
20 Shanghai
ALEXANDRIA
4816 Sea
14
26335,00
4993 Sea
11
17051,71
38 Hamburg
ALEXANDRIA
4990 Sea
39
47586,50
132 Hamburg
ALEXANDRIA
4952 Sea
78
92570,96
367 Hamburg
ALEXANDRIA
4820 Sea
19
238097,03
1272 Shanghai
ALEXANDRIA
4983 Sea
5
83150,00
4842 Sea
81
966107,19
5013 Laem Chabang ALEXANDRIA
4743 Sea
12
76820,00
518 Laem Chabang ALEXANDRIA
3591 Sea
14
22810,00
25 Hamburg
ALEXANDRIA
4992 Sea
6
61927,00
461 Hamburg
ALEXANDRIA
5005 Sea
6
61150,00
461 Antwerpen
ALEXANDRIA
5030 Sea
1
16607,00
67 Rotterdam
ALEXANDRIA
164 Nhava Sheva
DAMIETTA
1 Frankfurt
CAIRO
0 Prag
CAIRO
1 Düsseldorf
CAIRO
386 Hamburg
229 Nhava Sheva
262 Nhava Sheva
ALEXANDRIA
ALEXANDRIA
DAMIETTA
QR0714/12 QR1301/15 #15704925675 QR1003/16 QR1301/16 #15705240222 MS1520/16 MS541/18 #07796229685 MEHUIN #CAD0287833 AF341/09 AF570/10 #05752956363 OS712/15 OS863/16 #02074986446 MS1520/16 MS541/17 #07796229696 MSC PARIS #MSCURK944 313 VIRGINIABOR G #008 VIRGINIABOR G #006 MSC ROSA M #MSCUU9262 876 WIDE ALPHA #MAEU959487 994 MONTE ALEGRE #SGL445374 MONTE ALEGRE #SGL447543 RIO MADEIRA #SGL442903
2017-03-12
2017-03-12
2017-03-15
2017-03-15
2017-03-20
2017-03-21 32MKA
2017-03-16
2017-03-16
2017-03-16
2017-03-16
2017-03-21
2017-03-21 42MBR
2017-03-16
2017-03-16
2017-03-18
2017-03-18
2017-03-23
2017-03-21 00C ; 00EKH; 00URA; 1X; 31CYE; 32UBA; 41MK ; 42MBR; 42MKA; 99UBA
2017-02-27
2017-02-27
2017-03-08
2017-03-09
2017-03-18
2017-03-21 00
2017-03-13
2017-03-13
2017-03-16
2017-03-16
2017-03-21
2017-03-21 20BAT
2017-03-15
2017-03-15
2017-03-16
2017-03-16
2017-03-21
2017-03-21 12MB
2017-03-16
2017-03-16
2017-03-17
2017-03-18
2017-03-22
2017-03-21 00MA
2017-02-22
2017-02-22
2017-03-14
2017-03-13
2017-03-24
2017-03-22 11UBA
2017-02-27
2017-02-28
2017-03-14
2017-03-14
2017-03-24
2017-03-22 11MB
2017-02-28
2017-02-28
2017-03-14
2017-03-14
2017-03-24
2017-03-22 12MBL
2017-01-26
2017-01-30
2017-03-14
2017-03-14
2017-03-24
2017-03-22 11MBL; 12MBL
2017-02-16
2017-02-23
2017-03-10
2017-03-10
2017-03-20
2017-03-23 40URA
2017-03-08
2017-03-08
2017-03-18
2017-03-12
2017-03-28
2017-03-24 10PSB; 11C ; 11MB ; 12C
2017-03-08
2017-03-08
2017-03-18
2017-03-19
2017-03-28
2017-03-24 00; 1X; 20LCA; 20PGB; 2X; 30MA ; 3X; 40MA ; 41; 42
2017-03-01
2017-03-01
2017-03-14
2017-03-14
2017-03-24
MSC ROSA M #MSCUU9267 123 CMA CGM CORNEILLE #CAD0288782 BBC STEINWALL # BBC STEINWALL # MSC ANTIGUA #MSCURU081 718 MSC ANTIGUA #MSCURU123 965 MSC ANTIGUA #MSCURU152 402 MSC LORETTA #MSCURU208 451
2017-01-26
2017-01-30
2017-03-14
2017-03-14
2017-03-24
2017-03-24 00; 10C ; 11MB ; 12MB ; 1X; 20LAC; 20LD ; 2X; 30MA ; 30MKA; 3X; 40MA ; 40MKA 2017-03-25 22UHA
2017-03-06
2017-03-06
2017-03-15
2017-03-16
2017-03-25
2017-03-26 00
2017-02-07
2017-02-07
2017-02-28
2017-02-28
2017-03-10
2017-03-27 42UHA
2017-02-08
2017-02-07
2017-02-28
2017-02-28
2017-03-10
2017-03-27 42MBR
2017-02-28
2017-03-01
2017-03-18
2017-03-19
2017-03-28
2017-03-27 11CYE; 12CYE
2017-03-01
2017-03-01
2017-03-18
2017-03-19
2017-03-28
2017-03-27 11MPB
2017-03-01
2017-03-01
2017-03-18
2017-03-19
2017-03-28
2017-03-27 12MPB
2017-03-06
2017-03-06
2017-03-18
2017-03-19
2017-03-28
2017-03-27 31UHA
5012 Sea
2
30436,00
134 Rotterdam
2951 Air
1
580,00
3 Frankfurt
5081 Air
1
440,00
1 Port of Export CAIRO
5078 Air
2
239,91
1 Incheon
CAIRO
5085 Air
25
10254,91
23 D端sseldorf
CAIRO
2952 Air
1
136,00
1 Frankfurt
CAIRO
4943 Sea
6
144985,00
5067 Air
5
257,40
1 D端sseldorf
CAIRO
5075 Air
1
20,00
0 D端sseldorf
CAIRO
5087 Air
1
140,00
1 D端sseldorf
CAIRO
3590 Sea
4
243,20
1 Hamburg
ALEXANDRIA
3586 Sea
17
5381,13
7 Hamburg
ALEXANDRIA
4843 Sea
13
137257,16
977 Laem Chabang ALEXANDRIA
4844 Sea
13
137257,16
980 Laem Chabang ALEXANDRIA
2953 Air
4
81,21
4915 Sea
6
51181,00
423 Antwerpen
ALEXANDRIA
4960 Sea
9
93207,00
328 Antwerpen
ALEXANDRIA
4911 Sea
2
32565,00
193 Hamburg
ALEXANDRIA
5084 Air
1
395,00
4949 Sea
6
19000,00
153 Hamburg
ALEXANDRIA
4927 Sea
4
62537,41
386 Hamburg
ALEXANDRIA
4961 Sea
2
9353,80
122 Hamburg
ALEXANDRIA
656 Banten
0 Frankfurt
0 Amsterdam
ALEXANDRIA CAIRO
ALEXANDRIA
CAIRO
CAIRO
MSC LORETTA #MSCURU181 658 AF341M/14 AF570/16 #05752956374 EY873/22 EY653/24 #60774254191 EY873/22 EY653/24 #60774253944 LH7105/22 LH8290/23 #02099051514 LH8290/21 #02099051525 BBC HAREN #BANALE-001 AF341/16 AF570/18 #05752956385 LH077/16 LH8290/16 #02099051492 MS1520/16 MS541/17 #07796229711 MSC ANTIGUA #MSCURU134 160 MSC ANTIGUA #MSCURU099 082 BBC STEINWALL # BBC STEINWALL # MS1520/23 MS541/24 #07796229722 VIRGINIABOR G #005 VIRGINIABOR G #004 MSC ANTIGUA #MSCURK943 299 ZZ9541/18 MS541/19 #07796450480 MSC ANTIGUA #MSCURU042 892 MSC ANTIGUA #MSCURU105 913 MSC ANTIGUA #MSCURU067 998
2017-03-06
2017-03-06
2017-03-18
2017-03-19
2017-03-28
2017-03-27 11UHA
2017-03-14
2017-03-14
2017-03-23
2017-03-23
2017-03-28
2017-03-27 00MA
2017-03-22
2017-03-22
2017-03-24
2017-03-24
2017-03-29
2017-03-27 12
2017-03-22
2017-03-22
2017-03-24
2017-03-24
2017-03-29
2017-03-27 00
2017-03-22
2017-03-22
2017-03-23
2017-03-24
2017-03-28
2017-03-21
2017-03-21
2017-03-22
2017-03-22
2017-03-27
2017-03-27 00C ; 00EKH; 10UBA; 10URA; 11C ; 11MB ; 20URA; 30URA; 31MB ; 32MPR; 40URA; 42MB ; 42MKA 2017-03-27 00ABK
2017-02-14
2017-02-13
2017-03-06
2017-03-06
2017-03-16
2017-03-27 40MA
2017-03-16
2017-03-16
2017-03-18
2017-03-18
2017-03-23
2017-03-27 00EKH; 11MB ; 21MK ; 22MK ; 31MB
2017-03-16
2017-03-16
2017-03-16
2017-03-17
2017-03-21
2017-03-27 10MKA
2017-03-16
2017-03-16
2017-03-17
2017-03-18
2017-03-22
2017-03-27 20EKH
2017-03-01
2017-03-01
2017-03-18
2017-03-20
2017-03-28
2017-03-27 11BAA; 12BAA
2017-03-01
2017-03-01
2017-03-19
2017-03-19
2017-03-29
2017-03-27 11BTA; 30MKA; 40MKA
2017-02-07
2017-02-07
2017-02-28
2017-02-28
2017-03-10
2017-03-27 42UHA
2017-02-07
2017-02-07
2017-02-28
2017-02-28
2017-03-10
2017-03-27 41UHA
2017-03-23
2017-03-23
2017-03-24
2017-03-25
2017-03-29
2017-03-27 00MA
2017-02-27
2017-02-28
2017-03-14
2017-03-14
2017-03-24
2017-02-27
2017-02-28
2017-03-14
2017-03-14
2017-03-24
2017-03-28 10BFT; 11C ; 11MBR; 12C ; 12MBR 2017-03-28 12MKC; 20LAC; 20MKC; 40MA
2017-03-01
2017-03-01
2017-03-19
2017-03-19
2017-03-29
2017-03-28 11UBA; 12UBA
2017-03-18
2017-03-18
2017-03-23
2017-03-24
2017-03-28
2017-03-28 00UEN
2017-03-01
2017-03-01
2017-03-19
2017-03-19
2017-03-29
2017-03-28 32UHA
2017-03-01
2017-03-01
2017-03-18
2017-03-20
2017-03-28
2017-03-28 12UBA
2017-03-01
2017-03-01
2017-03-19
2017-03-19
2017-03-29
2017-03-28 11CYE; 12CYE
5000 Sea
4
65321,00
268 Rotterdam
ALEXANDRIA
4879 Sea
49
77540,00
405 Hamburg
ALEXANDRIA
4964 Sea
97
39416,00
758 Hamburg
ALEXANDRIA
4872 Sea
29
27300,00
64 Busan
ALEXANDRIA
4893 Sea
12
161400,20
803 Busan
ALEXANDRIA
3589 Sea
6
6205,00
18 Hamburg
5107 Air
1
1988,00
6 Istanbul
CAIRO
5095 Air
5
314,00
2 Amsterdam
CAIRO
5079 Air
2
9310,00
2946 Sea
1
2,55
0 Blexen
ALEXANDRIA
4991 Sea
1
395200,00
240 Blexen
ALEXANDRIA
5004 Sea
1
8015,00
86 Hamburg
ALEXANDRIA
4963 Sea
20
13684,00
60 Hamburg
ALEXANDRIA
4971 Sea
3
4600,00
15 Hamburg
ALEXANDRIA
4999 Sea
3
2200,00
19 Hamburg
ALEXANDRIA
4979 Sea
4
6191,00
14 Hamburg
ALEXANDRIA
5102 Air
2
24,90
5103 Air
2
4959 Sea
3588 Sea
28 Incheon
ALEXANDRIA
CAIRO
0 Prag
CAIRO
1824,00
2 Genua
CAIRO
1
8636,00
67 Houston
2
480,00
2 Hamburg
ALEXANDRIA
ALEXANDRIA
MSC LORETTA #MSCURU152 618 HS PARIS #SGL433479 HS PARIS #SGL442518 COSCO HARMONY #SEL0668527 COSCO HARMONY #SEL0668589 MSC ADELAIDE #MSCURU156 783 MB200/25 #71699867574 MB224/24 MB061/25 #71631402070 CV6916/25 CV8501/27 #17219362733 NORDERSAND #NORD-BLEBUR-2A NORDERSAND #NORD-BLEBUR-2A MSC ADELAIDE #MSCURU181 872 MSC ADELAIDE #MSCURU098 860 MSC ADELAIDE #MSCURU083 318 MSC ADELAIDE #MSCURU179 900 MSC ADELAIDE #MSCURU114 766 LH7431S/27 LH8290/28 #02074986586 CV9953/24 CV8501/27 #17218756496 SESPAN SAIGON #HLCUHOU17 0254730 MSC ADELAIDE #MSCURU154 796
2017-03-06
2017-03-06
2017-03-18
2017-03-19
2017-03-28
2017-03-29 31UHA
2017-03-15
2017-03-15
2017-03-25
2017-03-25
2017-04-04
2017-03-30 11BAT; 12BAT
2017-03-15
2017-03-15
2017-03-25
2017-03-25
2017-04-04
2017-03-30 11BAA; 12BAA
2017-02-16
2017-02-15
2017-03-22
2017-03-23
2017-04-01
2017-03-31 30; 31; 32
2017-02-16
2017-02-15
2017-03-22
2017-03-23
2017-04-01
2017-04-01 31UHA
2017-03-08
2017-03-10
2017-03-27
2017-03-27
2017-04-06
2017-04-02 00
2017-03-25
2017-03-25
2017-03-25
2017-03-26
2017-03-30
2017-04-02 21SGC
2017-03-24
2017-03-24
2017-03-26
2017-03-26
2017-03-31
2017-04-02 20; 30; 31; 32
2017-03-25
2017-03-25
2017-03-28
2017-03-28
2017-04-02
2017-04-02 00
2017-03-01
2017-03-02
2017-03-20
2017-03-20
2017-03-30
2017-04-03 30MK
2017-03-01
2017-03-02
2017-03-18
2017-03-20
2017-03-28
2017-04-03 30MKA
2017-03-08
2017-03-10
2017-03-27
2017-03-27
2017-04-06
2017-04-03 00URA
2017-03-08
2017-03-10
2017-03-27
2017-03-27
2017-04-06
2017-04-03 11BAA; 12BAA
2017-03-08
2017-03-10
2017-03-27
2017-03-27
2017-04-06
2017-04-03 30PAA
2017-03-08
2017-03-10
2017-03-27
2017-03-27
2017-04-06
2017-04-03 41MBR
2017-03-08
2017-03-10
2017-03-27
2017-03-27
2017-04-06
2017-04-03 11CYE; 12CYE
2017-03-27
2017-03-27
2017-03-30
2017-03-31
2017-04-04
2017-04-03 41MB ; 42MB
2017-03-24
2017-03-24
2017-03-28
2017-03-28
2017-04-02
2017-04-03 00URA
2017-02-25
2017-02-27
2017-03-28
2017-03-28
2017-04-07
2017-04-03 31UHA
2017-03-08
2017-03-10
2017-03-27
2017-03-27
2017-04-06
2017-04-03 00
4954 Sea
30
9241,00
30 Hamburg
2955 Air
1
330,00
1 Frankfurt
CAIRO
5109 Air
3
562,00
3 Prag
CAIRO
3595 Air
2
12,54
0 Frankfurt
CAIRO
5111 Air
1
20,00
0 Düsseldorf
CAIRO
5093 Air
12
543,11
4 Düsseldorf
CAIRO
5106 Air
1
1,50
0 Wien
CAIRO
5112 Air
2
70,50
0 Amsterdam
CAIRO
3587 Sea
1
35,65
0 Rijeka
ALEXANDRIA
4795 Sea
7
83682,21
469 Shanghai
ALEXANDRIA
4980 Sea
199
197035,00
405 Hamburg
ALEXANDRIA
4962 Sea
15
19575,92
5002 Sea
18
44586,00
3599 Air
1
22,70
5123 Air
1
3597 Air
98 Rijeka 248 Izmir
ALEXANDRIA
ALEXANDRIA ALEXANDRIA
0 Prag
CAIRO
232,00
1 Amsterdam
CAIRO
1
321,00
1 Brüssel
CAIRO
5015 Sea
5
81660,00
4789 Sea
2
510,00
2 Shanghai
ALEXANDRIA
4788 Sea
2
36701,32
159 Shanghai
ALEXANDRIA
5056 Sea
1
8430,00
77 Hamburg
ALEXANDRIA
262 Nhava Sheva
DAMIETTA
MSC ADELAIDE #MSCURU192 549 MS1520/28 MS541/29 #07796229744 KL8550/28 MP8140/30 #07453802070 AF341/22 AF570/24 #05752956396 MS1520/28 MS541/29 #07796229733 AF341M/29 AF570/31 #05752956400 OS129/30 LH8290/30 #02074962145 MB724/30 MB201/01 #71631396643 AS CYPRIA #RJK0112017 MSC LA SPEZIA #MSCUU9353 683 MSC ADELAIDE #MSCURU172 210 AS CYPRIA #RJK0112010 MSC MIRELLA #MSCURU190 212 EK140/31 EK927/02 #17634870124 MS5134/01 MS521/02 #07796399671 MS521/30 #07796173593 SUEZ CANAL #CAD0289671 MSC BETTINA #MSCUU9430 291 MSC BETTINA #MSCUU9430 317 MSC ALTAMIRA #MSCURU257 227
2017-03-08
2017-03-10
2017-03-27
2017-03-27
2017-04-06
2017-04-03 00
2017-03-28
2017-03-28
2017-03-29
2017-03-29
2017-04-03
2017-04-04 30MA
2017-03-28
2017-03-28
2017-03-30
2017-03-30
2017-04-04
2017-04-04 30BAA
2017-03-28
2017-03-28
2017-03-31
2017-04-01
2017-04-05
2017-04-04 00URA
2017-03-28
2017-03-28
2017-03-29
2017-03-29
2017-04-03
2017-04-04 22MBR
2017-03-29
2017-03-29
2017-03-31
2017-04-01
2017-04-05
2017-04-04 00URA; 10UBA; 11UBA; 20UBA; 21UBA; 22MB ; 22UBA; 31UBA; 42MB
2017-03-30
2017-03-30
2017-03-30
2017-03-30
2017-04-04
2017-04-04 10PAB
2017-03-30
2017-03-30
2017-04-01
2017-04-02
2017-04-06
2017-04-04 00UEN
2017-03-14
2017-03-15
2017-03-29
2017-03-28
2017-04-08
2017-04-04 20BAT
2017-02-02
2017-02-06
2017-03-28
2017-03-28
2017-04-07
2017-04-05 12UHA
2017-03-08
2017-03-10
2017-03-27
2017-03-27
2017-04-06
2017-04-05 00
2017-03-14
2017-03-15
2017-03-29
2017-03-28
2017-04-08
2017-04-05 20BAT
2017-03-02
2017-03-04
2017-04-01
2017-03-29
2017-04-11
2017-04-06 30URA; 40URA
2017-03-31
2017-03-31
2017-04-02
2017-04-02
2017-04-07
2017-04-06 30BAA
2017-04-02
2017-04-02
2017-04-02
2017-04-02
2017-04-07
2017-04-06 11UHA
2017-03-30
2017-03-30
2017-03-30
2017-03-30
2017-04-04
2017-04-06 11UHA
2017-03-20
2017-03-20
2017-03-29
2017-03-29
2017-04-08
2017-04-07 00
2017-02-18
2017-02-20
2017-04-03
2017-04-03
2017-04-13
2017-04-07 11MBL; 12MBL
2017-02-18
2017-02-20
2017-04-03
2017-04-03
2017-04-13
2017-04-07 11MBL; 12MBL
2017-03-15
2017-03-15
2017-04-02
2017-04-02
2017-04-12
2017-04-08 20UBA
5036 Sea
1
1606,00
4 Hamburg
ALEXANDRIA
5135 Air
1
10,00
0 Wien
CAIRO
5136 Air
11
7621,00
4968 Sea
3
41994,06
289 Hamburg
ALEXANDRIA
4947 Sea
5
67670,00
482 Hamburg
ALEXANDRIA
4946 Sea
1
11700,00
96 Hamburg
ALEXANDRIA
5066 Sea
3
41647,00
201 Rotterdam
ALEXANDRIA
4972 Sea
9
211502,91
318 Shanghai
ALEXANDRIA
5010 Sea
93
58035,57
170 Hamburg
ALEXANDRIA
5108 Air
12
3630,87
9 Düsseldorf
CAIRO
5116 Air
1
1230,00
15 Düsseldorf
CAIRO
3600 Air
4
386,70
2 Frankfurt
CAIRO
4832 Sea
3
1935,00
3 Shanghai
ALEXANDRIA
4869 Sea
4
52396,00
268 Shanghai
ALEXANDRIA
4905 Sea
2
27385,37
134 Shanghai
ALEXANDRIA
4969 Sea
2
33144,00
134 Shanghai
ALEXANDRIA
4995 Sea
1
10219,70
76 Shanghai
ALEXANDRIA
5134 Air
6
6468,00
4860 Sea
5
72581,30
343 Shanghai
ALEXANDRIA
4786 Sea
39
21282,00
42 Shanghai
ALEXANDRIA
10 Amsterdam
3 Düsseldorf
CAIRO
CAIRO
MSC ALTAMIRA #MSCURU208 881 QR184 QR1301 #15755269885 MP8140/06 #07455762206 MSC ALTAMIRA #MSCURU240 702 MSC ALTAMIRA #MSCURU041 183 MSC ALTAMIRA #MSCURU041 639 E.R. YOKOHAMA #MSCURU327 970 EVER CHIVARLY #EGLV142751 543201 RIO BLANCO #SGL449011
2017-03-15
2017-03-15
2017-04-02
2017-04-02
2017-04-12
2017-04-08 11CYE
2017-04-04
2017-04-04
2017-04-05
2017-04-05
2017-04-10
2017-04-08 32CYE
2017-04-06
2017-04-06
2017-04-06
2017-04-06
2017-04-11
2017-04-08 11UHA
2017-03-15
2017-03-15
2017-04-02
2017-04-02
2017-04-12
2017-04-09 20UBA; 21UBA; 22UBA
2017-03-15
2017-03-15
2017-04-02
2017-04-02
2017-04-12
2017-04-09 20UBA
2017-03-15
2017-03-15
2017-04-02
2017-04-02
2017-04-12
2017-04-09 20UBA
2017-03-20
2017-03-20
2017-04-02
2017-04-02
2017-04-12
2017-04-09 11UHA
2017-03-05
2017-03-06
2017-03-31
2017-03-31
2017-04-10
2017-04-10 00
2017-03-22
2017-03-22
2017-04-02
2017-04-02
2017-04-12
AF341M/03 AF570/04 #05752956411 LH7105S/05 LH8290/06 #02099051584 AF341/31 AF570/03 #05752956422 MSC GAIA #MSCUU9574 783 MSC BETTINA #MSCUU9436 801 MSC IRENE #MSCUU9530 397 MSC GAIA #MSCUU9569 973 MSC GAIA #MSCUU9574 775 LH7105S + LH8290 #02099051595 MSC BETTINA #MSCUU9430 283 MSC BETTINA #MSCUU9430 309
2017-04-04
2017-04-04
2017-04-05
2017-04-05
2017-04-10
2017-04-10 01LD ; 10QCL; 11MB ; 12MB ; 20QCL; 2X; 30MA ; 30QCL; 3X; 40; 40LBG; 40QCB; 40QCL; 4x; xxLBG 2017-04-10 00BRU; 00EKH; 11UHA; 22MB ; 41MB ; 41MK ; 42MB ; 42MBR
2017-04-05
2017-04-05
2017-04-06
2017-04-07
2017-04-11
2017-04-10 00URA
2017-03-31
2017-03-31
2017-04-05
2017-04-07
2017-04-10
2017-04-10 00URA
2017-02-12
2017-03-03
2017-04-03
2017-04-03
2017-04-13
2017-04-11 4x
2017-02-18
2017-02-20
2017-04-03
2017-04-03
2017-04-13
2017-04-11 32UHA
2017-02-25
2017-02-27
2017-04-03
2017-04-03
2017-04-13
2017-04-11 32UHA
2017-03-02
2017-03-03
2017-04-03
2017-04-03
2017-04-13
2017-04-11 11UHA
2017-03-03
2017-03-03
2017-04-03
2017-04-03
2017-04-13
2017-04-11 42UHA
2017-04-05
2017-04-05
2017-04-10
2017-04-10
2017-04-15
2017-04-11 22MBR
2017-02-18
2017-03-20
2017-04-03
2017-04-03
2017-04-13
2017-04-11 41UHA
2017-02-18
2017-02-20
2017-04-03
2017-04-03
2017-04-13
2017-04-11 3x; 4x
4933 Sea
4
62709,60
268 Shanghai
ALEXANDRIA
4923 Sea
5
41336,40
335 Shanghai
ALEXANDRIA
5011 Sea
10
27880,00
71 Gemlik
ALEXANDRIA
4953 Sea
1
9048,00
67 Busan
ALEXANDRIA
4934 Sea
3
5929,06
40 Busan
ALEXANDRIA
4942 Sea
3
19329,64
48 Busan
ALEXANDRIA
4709 Sea
25
87648,00
5034 Sea
2
12480,00
4871 Sea
5
29396,00
150 Antwerpen
ALEXANDRIA
4976 Sea
2
24985,00
83 Antwerpen
ALEXANDRIA
5128 Air
3
693,20
5 Düsseldorf
5016 Sea
2
9375,00
44 Antwerpen
ALEXANDRIA
5013 Sea
6
35315,00
222 Antwerpen
ALEXANDRIA
5045 Sea
1
13100,00
66 Antwerpen
ALEXANDRIA
5052 Sea
2
11075,00
48 Antwerpen
ALEXANDRIA
4982 Sea
2
7221,00
85 Hamburg
ALEXANDRIA
5119 Air
1
25,00
2956 Air
1
315,00
5145 Air
1
5154 Air 5076 Air
130 Shanghai 93 Ho Chi Minh Port
ALEXANDRIA ALEXANDRIA
CAIRO
0 Incheon
CAIRO
3 Frankfurt
CAIRO
1,00
0 Amsterdam
CAIRO
1
0,20
0 Wien
CAIRO
1
333,22
4 Sao Paulo
CAIRO
5025 Sea
95
89221,00
396 Hamburg
ALEXANDRIA
5048 Sea
2
3758,00
9 Hamburg
ALEXANDRIA
5022 Sea
4
18800,00
154 Hamburg
ALEXANDRIA
2949 Sea
2
2604,00
12 Hamburg
ALEXANDRIA
MSC IRENE #MSCUU9530 389 MSC IRENE #MSCUU9530 405 MSC MIRELLA #MSCURU178 449 COSCO HOPE #SEL0671741 MSC GAIA #MSCUKU704 215 MSC GAIA #MSCUKU704 108 CP MOON #CPJQMN67S HAEDK02 ITAL UNIVERSO #YMLUM4903 03105 CELEBRATION #025 CELEBRATION #020 KL8440/07 MP8910/10 #07453010613 CELEBRATION #023 CELEBRATION #022 CELEBRATION #021 CELEBRATION #033 CELEBRATION #024 QR859/06 QR1303/07 #15703269383 AF341/07 AF570/8 #05752956433 MP8910/10 #07455762593 MS798/08 #07792598531 LH8273/30 LH8290/06 #02094546115 MSC SINDY #MSCURU341 864 MSC SINDY #MSCURU263 621 RIO BLANCO #SGL450288 MSC SINDY #MSCURU275 799
2017-02-25
2017-02-27
2017-04-03
2017-04-04
2017-04-13
2017-04-11 42UHA
2017-02-25
2017-02-27
2017-04-03
2017-04-03
2017-04-13
2017-04-12 31UHA
2017-03-19
2017-03-19
2017-04-06
2017-04-07
2017-04-16
2017-04-12 40
2017-03-02
2017-03-02
2017-04-08
2017-04-08
2017-04-18
2017-04-12 32UHA
2017-02-26
2017-02-26
2017-04-03
2017-04-03
2017-04-13
2017-04-12 00
2017-02-26
2017-02-26
2017-04-03
2017-04-03
2017-04-13
2017-04-12 00
2017-03-02
2017-03-03
2017-04-03
2017-04-03
2017-04-13
2017-04-13 11BBT; 12BBT
2017-03-14
2017-03-14
2017-04-07
2017-04-07
2017-04-17
2017-04-13 41UHA
2017-03-22
2017-03-22
2017-04-06
2017-04-03
2017-04-16
2017-04-13 30MA
2017-03-22
2017-03-22
2017-04-06
2017-04-03
2017-04-16
2017-04-13 10PAC; 40MA
2017-04-07
2017-04-07
2017-04-10
2017-04-11
2017-04-15
2017-04-13 00UBA; 31MPR; 99UBA
2017-03-22
2017-03-22
2017-04-06
2017-04-03
2017-04-16
2017-04-14 20BFT
2017-03-22
2017-03-22
2017-04-06
2017-04-03
2017-04-16
2017-04-14 20PAC
2017-03-22
2017-03-22
2017-04-06
2017-04-03
2017-04-16
2017-04-14 30MA
2017-03-22
2017-03-22
2017-04-06
2017-04-03
2017-04-16
2017-04-14 10PAH
2017-03-22
2017-03-22
2017-04-06
2017-04-03
2017-04-16
2017-04-14 20QU
2017-04-06
2017-04-06
2017-04-07
2017-04-07
2017-04-12
2017-04-14 11UHA
2017-04-07
2017-04-07
2017-04-08
2017-04-09
2017-04-13
2017-04-14 00MA
2017-04-10
2017-04-10
2017-04-10
2017-04-11
2017-04-15
2017-04-14 00UEN
2017-04-08
2017-04-08
2017-04-08
2017-04-08
2017-04-13
2017-04-14 99UBA
2017-03-30
2017-03-30
2017-04-06
2017-04-07
2017-04-11
2017-04-14 40URA
2017-03-22
2017-03-23
2017-04-09
2017-04-09
2017-04-19
2017-03-22
2017-03-23
2017-04-08
2017-04-09
2017-04-18
2017-04-15 00; 02LD ; 10C ; 1X; 20BTA; 20C ; 2X; 30LBF; 30MA ; 3X; 40MA ; 40MKA; 4X 2017-04-15 20PGB
2017-03-29
2017-03-29
2017-04-08
2017-04-09
2017-04-18
2017-03-22
2017-03-23
2017-04-08
2017-04-09
2017-04-18
2017-04-15 10QCD; 20QCD; 30QCD; 40QCD 2017-04-15 00MK
4924 Sea
12
187476,19
803 Shanghai
ALEXANDRIA
5064 Sea
4
44292,20
308 Hamburg
ALEXANDRIA
5065 Sea
2
15287,80
154 Hamburg
ALEXANDRIA
4977 Sea
12
60749,00
102 Hamburg
ALEXANDRIA
5028 Sea
3
4600,00
15 Hamburg
ALEXANDRIA
5006 Sea
48
128664,00
358 Antwerpen
ALEXANDRIA
3594 Sea
12
2552,55
4 Hamburg
ALEXANDRIA
5041 Sea
12
89875,00
803 Hamburg
ALEXANDRIA
5139 Air
6
535,20
4 Düsseldorf
CAIRO
3570 Sea
1
270,00
1 Shanghai
ALEXANDRIA
5042 Sea
3
51678,00
5130 Air
7
17639,00
5159 Air
1
980,00
3 Düsseldorf
CAIRO
5148 Air
1
544,00
1 Wien
CAIRO
5158 Air
3
1078,32
2 Düsseldorf
CAIRO
5168 Air
1
5,72
0 Berlin
CAIRO
5164 Air
1
2,06
0 Prag
CAIRO
5149 Air
14
10548,20
32 Düsseldorf
CAIRO
5156 Air
1
740,00
1 Düsseldorf
CAIRO
5160 Air
2
6,95
0 Prag
CAIRO
5161 Air
1
178,00
0 Düsseldorf
CAIRO
157 Nhava Sheva 40 Incheon
DAMIETTA CAIRO
CP MOON #CPJQMN67S HAEDK51 MSC SINDY #MSCURU330 404 MSC SINDY #MSCURU330 586 MSC SINDY #MSCURU118 817 MSC SINDY #MSCURU245 214 RIO DE LA PLATA #SGL447980 MSC SINDY #MSCURU352 325 MSC SINDY #MSCURU264 652 LH7105S/12 LH8290/13 # AL DHAIL #CNSHA68704 6 PRIORITY #CAD0290497 CV6916/08 CV8501/10 #17219362932 LH7105/10 LH8290/11 #02099051702 MS9537T/07 MS541/12 #07792598542 MS1520/13 MS541/14 #07796229766 MS732/14 #07796229770 LH1397/15 LH8290/16 #02074986822 KL8440/12 MP8910/17 #07453010624 LH7105S712 LH8290/13 #02099051680 LH7431S/15 LH8290/16 #02074986833 LH8290/13 #02099051724
2017-03-01
2017-03-03
2017-04-03
2017-04-03
2017-04-13
2017-04-15 31UHA
2017-03-22
2017-03-23
2017-04-08
2017-04-09
2017-04-18
2017-04-15 11MB ; 12MB
2017-03-22
2017-03-23
2017-04-08
2017-04-09
2017-04-18
2017-04-15 11MB ; 12MB
2017-03-22
2017-03-23
2017-04-09
2017-04-09
2017-04-19
2017-04-16 40MA
2017-03-22
2017-03-23
2017-04-08
2017-04-09
2017-04-18
2017-04-16 20PAA
2017-03-29
2017-03-29
2017-04-08
2017-04-09
2017-04-18
2017-04-16 11MPB; 12MPB
2017-03-22
2017-03-23
2017-04-08
2017-04-09
2017-04-18
2017-04-16 10MA ; 20BTA; 40MKA
2017-03-22
2017-03-23
2017-04-08
2017-04-09
2017-04-18
2017-04-17 32UHA
2017-04-12
2017-04-12
2017-04-13
2017-04-14
2017-04-18
2017-03-11
2017-03-11
2017-04-13
2017-04-13
2017-04-23
2017-04-17 00MA ; 11MB ; 40EKH; 42MB ; XX 2017-04-19 12BBT
2017-03-27
2017-03-27
2017-04-05
2017-04-07
2017-04-15
2017-04-20 00
2017-04-10
2017-04-08
2017-04-17
2017-04-18
2017-04-22
2017-04-20 00
2017-04-11
2017-04-12
2017-04-12
2017-04-14
2017-04-17
2017-04-20 10MA
2017-04-07
2017-04-07
2017-04-12
2017-04-12
2017-04-17
2017-04-20 11CYE
2017-04-13
2017-04-13
2017-04-14
2017-04-14
2017-04-19
2017-04-21 10MA ; 42MB
2017-04-14
2017-04-14
2017-04-18
2017-04-18
2017-04-23
2017-04-21 42MB
2017-04-15
2017-04-15
2017-04-19
2017-04-19
2017-04-24
2017-04-21 42MB
2017-04-12
2017-04-12
2017-04-17
2017-04-17
2017-04-22
2017-04-21 00C ; 00MA ; 00URA; 10C ; 11C ; 12C ; 1X; 20EKH; 2X; 32MKA; 42C
2017-04-12
2017-04-12
2017-04-13
2017-04-14
2017-04-18
2017-04-21 22MBR
2017-04-15
2017-04-15
2017-04-19
2017-04-19
2017-04-24
2017-04-21 41MB
2017-04-13
2017-04-13
2017-04-13
2017-04-14
2017-04-18
2017-04-21 42MB
5155 Air
1
14,00
0 Frankfurt
4862 Sea
5
85493,10
339 Shanghai
ALEXANDRIA
5073 Sea
3
30064,68
157 Nhava Sheva
ALEXANDRIA
5090 Sea
3
6150,00
27 Hamburg
ALEXANDRIA
5060 Sea
74
112488,34
665 Hamburg
ALEXANDRIA
5063 Sea
102 Jebel Ali
ALEXANDRIA
10
7960,00
5171 Air
1
4,20
5157 Air
1
5009 Sea
CAIRO
0 Wien
CAIRO
69,00
0 Milano
CAIRO
12
162760,30
803 Busan
ALEXANDRIA
5032 Sea
5
41726,40
335 Shanghai
ALEXANDRIA
5099 Sea
3
227000,00
298 3rd May Shipyard
BURULLUS
5071 Sea
2
20968,00
154 Hamburg
ALEXANDRIA
4914 Sea
6
26480,00
29 Ulsan
ALEXANDRIA
4917 Sea
3
20820,00
42 Ulsan
ALEXANDRIA
5021 Sea
1
9008,00
67 Busan
ALEXANDRIA
5033 Sea
2
27127,42
5014 Sea
6
2816,00
8 Chennai
ALEXANDRIA
5058 Sea
1
8636,00
67 Houston
ALEXANDRIA
5172 Air
1
23,00
5163 Air
5
343,94
5185 Air
1
2,16
134 Shanghai
ALEXANDRIA
0 Amsterdam
CAIRO
2 Düsseldorf
CAIRO
0 Frankfurt
CAIRO
MS1520/13 MS541/14 #07796229755 CP MOON #CPJQMN67S HAEDK01 MAIPO #CAD0291809 MSC MARIANNA #MSCURU371 416 MSC MARIANNA #MSCURU383 163 UASC YAS #DXB0353567 MS798/20 #07792598634 QR8445/15 QR1301/17 #15705773493 MSC LIVORNO #MSCUKU723 595 MSC LIVORNO #MSCUU9682 966 SCHILLPLATE #SCHIL_RIJ_B UR MSC MARIANNA #MSCURU378 759 DA TONG YUNG #ULSALX-4914 DA TONG YUN # MSC LIVORNO #MSCUKU723 546 MSC LIVORNO #MSCUU9682 974 NORTHERN PRIORITY #YMLUM5150 68635 NORTHERN DECENCY #HLCUHOU17 0360448 MS758/21 #07796402493 MS1520/21 MS541/23 #07796229781 LH1246/22 OS863/23 #02099051783
2017-04-13
2017-04-13
2017-04-14
2017-04-14
2017-04-19
2017-04-21 00ABA
2017-03-02
2017-03-03
2017-04-03
2017-04-03
2017-04-13
2017-04-22 41UHA
2017-04-03
2017-04-04
2017-04-13
2017-04-15
2017-04-23
2017-04-22 00
2017-03-29
2017-03-31
2017-04-15
2017-04-17
2017-04-25
2017-04-24 20LAC
2017-03-29
2017-03-31
2017-04-16
2017-04-17
2017-04-26
2017-04-25 00C ; 02LD ; 12MB ; 20C ; 21C ; 22C ; 22MB ; 30LD ; 30MA ; 3X; 40LD ; 40MKA; 4X
2017-03-29
2017-03-29
2017-04-23
2017-04-23
2017-05-03
2017-04-25 22MBR
2017-04-20
2017-04-20
2017-04-20
2017-04-20
2017-04-25
2017-04-25 41CYE
2017-04-15
2017-04-15
2017-04-17
2017-04-16
2017-04-22
2017-04-25 00URA
2017-03-12
2017-03-12
2017-04-18
2017-04-18
2017-04-28
2017-04-26 32UHA
2017-03-17
2017-03-17
2017-04-18
2017-04-18
2017-04-28
2017-04-26 32UHA
2017-04-18
2017-04-18
2017-04-24
2017-04-25
2017-05-04
2017-04-26 30BAT
2017-03-29
2017-03-31
2017-04-15
2017-04-17
2017-04-25
2017-04-26 10MA ; 30MA
2017-02-27
2017-03-04
2017-04-18
2017-04-19
2017-04-28
2017-04-27 41UHA
2017-02-28
2017-03-04
2017-04-18
2017-04-19
2017-04-28
2017-04-27 20LCB
2017-03-12
2017-03-12
2017-04-18
2017-04-18
2017-04-28
2017-04-27 41UHA
2017-03-17
2017-03-17
2017-04-17
2017-04-18
2017-04-27
2017-04-27 41UHA
2017-03-18
2017-03-19
2017-04-23
2017-04-20
2017-05-03
2017-04-27 41UHA
2017-03-26
2017-03-26
2017-04-21
2017-04-22
2017-05-01
2017-04-27 32UHA
2017-04-21
2017-04-21
2017-04-21
2017-04-23
2017-04-26
2017-04-28 11UHA
2017-04-21
2017-04-21
2017-04-24
2017-04-24
2017-04-29
2017-04-28 20MA ; 32MKA; 41MK ; 42MB ; 42MKA
2017-04-22
2017-04-22
2017-04-23
2017-04-23
2017-04-28
2017-04-28 32UBA
5190 Air
3
846,00
7 Frankfurt
CAIRO
5191 Air
1
72,00
1 Prag
CAIRO
4913 Sea
24
3086000,00
5117 Sea
1
11064,00
5072 Sea
53
73418,20
5125 Sea
1
14224,00
67 Rotterdam
5174 Air
3
204,97
2 D端sseldorf
5173 Air
1
829,00
1 Incheon
5096 Sea
24
7966,00
2950 Sea
1
1670,00
5114 Sea
4
367000,00
630 Rotterdam
5196 Air
1
100,00
0 D端sseldorf
5089 Sea
1
5000,00
19 Felixstowe
ALEXANDRIA
5100 Sea
3
56600,00
91 Rotterdam
BURULLUS
5126 Sea
4
20020,00
85 Antwerpen
ALEXANDRIA
5187 Air
7
3960,20
4 D端sseldorf
CAIRO
5202 Air
1
90,00
0 D端sseldorf
CAIRO
5077 Sea
1
6300,00
43 Antwerpen
ALEXANDRIA
5083 Sea
5
35200,00
221 Antwerpen
ALEXANDRIA
5113 Sea 5110 Sea
12 16
89445,00 27888,00
803 Hamburg 57 Chennai
ALEXANDRIA DAMIETTA
2954 Sea
1
2,55
0 Rotterdam
BURULLUS
5118 Sea
1
395000,00
240 Rotterdam
BURULLUS
6490 Ulsan 86 Rotterdam 241 Hamburg
19 Rotterdam
ALEXANDRIA ALEXANDRIA ALEXANDRIA ALEXANDRIA
CAIRO
ALEXANDRIA
8 Southampton/ ALEXANDRIA Felixtow BURULLUS CAIRO
MS1584/26 MS541/26 #07796229792 EK140/27 EK925/28 #17634870345 DA TONG YUNG #ULSALX-4913 MSC LORETTA #MSCURU457 686 MSC BILBAO #MSCURU431 111 MSC LORETTA #MSCURU474 046 AF341M/26 AF570/28 #05752956444 EY873/27 EY653/28 #60775032322 MSC BILBAO #MSCURU408 283 MSC LORETTA #MSCURU367 760 ACCUM #ACCU-ROTBUR-2 MS1596/28 MS541/30 #07796229814 MSC LORETTA #MSCURU447 919 ACCUM #ACCU-ROTBUR-3 LADY DEBORA #024 MS1520/28 MS541/30 #07796229803 MS1520/04 MS541/05 #07796229825 LADY DEBORA #021 LADY DEBORA #023 MSC SEATTLE CMA CGM PUCCINI #AAK0120893 ACCUM #ACCU-ROTBUR-1B ACCUM #ACCU-ROTBUR-1A
2017-04-26
2017-04-26
2017-04-26
2017-04-26
2017-05-01
2017-04-29 42MB
2017-04-27
2017-04-26
2017-04-28
2017-04-28
2017-05-03
2017-04-29 42MB
2017-02-27
2017-03-04
2017-04-18
2017-04-19
2017-04-28
2017-04-30 41UHA
2017-04-10
2017-04-10
2017-04-26
2017-04-26
2017-05-06
2017-04-30 22MBR
2017-04-05
2017-04-06
2017-04-26
2017-04-26
2017-05-06
2017-04-10
2017-04-10
2017-04-26
2017-04-26
2017-05-06
2017-05-03 00; 00C ; 01LD ; 20LAC; 30LCL; 30MA ; 3X; 40MA ; 40MKA; 41; 42; 4X 2017-05-03 11UHA
2017-04-26
2017-04-26
2017-04-28
2017-04-27
2017-05-03
2017-05-03 00URA; 30UBA; 42MKA
2017-04-27
2017-04-27
2017-04-28
2017-04-28
2017-05-03
2017-05-03 11UHA
2017-04-05
2017-04-06
2017-04-26
2017-04-26
2017-05-06
2017-05-04 00; 40; 41; 42
2017-04-06
2017-04-07
2017-04-26
2017-04-26
2017-05-06
2017-05-04 00ABK
2017-04-20
2017-04-20
2017-05-04
2017-05-04
2017-05-14
2017-05-05 30MA
2017-04-28
2017-04-28
2017-04-30
2017-04-30
2017-05-05
2017-05-05 42MB
2017-04-06
2017-04-07
2017-04-26
2017-04-26
2017-05-06
2017-05-05 00
2017-04-20
2017-04-20
2017-05-04
2017-05-04
2017-05-14
2017-05-05 30MA
2017-04-10
2017-04-11
2017-04-26
2017-04-25
2017-05-06
2017-05-07 30MKC; 40MKC
2017-04-28
2017-04-28
2017-04-30
2017-04-30
2017-05-05
2017-05-07 00; 10MA ; XX
2017-05-04
2017-05-04
2017-05-05
2017-05-05
2017-05-10
2017-05-07 31MB
2017-04-10
2017-04-11
2017-04-26
2017-04-25
2017-05-06
2017-05-07 11BAC
2017-04-10
2017-04-11
2017-04-26
2017-04-25
2017-05-06
2017-05-07 30PAC
2017-04-12 2017-04-16
2017-04-15 2017-04-16
2017-05-01 2017-04-28
2017-05-01 2017-04-28
2017-05-11 2017-05-08
2017-05-08 41UHA 2017-05-08 41UHA
2017-04-20
2017-04-20
2017-05-04
2017-05-04
2017-05-14
2017-05-08 40MKA
2017-04-20
2017-04-20
2017-05-04
2017-05-04
2017-05-14
2017-05-08 40MKA
5049 Sea
17
24450,00
5129 Sea
67 Busan 166 Hamburg
ALEXANDRIA
53
46677,00
5206 Air
3
216,00
ALEXANDRIA
5192 Air
1
1143,00
9005 Air
5
2175,40
5211 Air
3
825,00
6 Frankfurt
CAIRO
3596 Sea
17
436,23
2 Hamburg
ALEXANDRIA
5104 Sea
97
120176,00
372 Hamburg
ALEXANDRIA
5120 Sea
6
97497,78
402 Shanghai
ALEXANDRIA
5121 Sea
2
27247,42
134 Shanghai
ALEXANDRIA
2 Prag
CAIRO
1 Incheon
CAIRO
14 Frankfurt/Airp CAIRO ort
5115 Sea
1
4511,79
26 Busan
ALEXANDRIA
5105 Sea
12
162232,30
803 Busan
ALEXANDRIA
5194 Air
6
739,29
5188 Air
3
5205 Air
4 Düsseldorf
CAIRO
3611,00
6 Incheon
CAIRO
21
3714,00
9 Amsterdam
CAIRO
5209 Air
1
0,80
0 Wien
CAIRO
5213 Air
1
130,00
1 Düsseldorf
CAIRO
5101 Sea
6
19000,00
153 Hamburg
5221 Air
6
1650,00
12 Frankfurt
5091 Sea
5
41206,40
335 Shanghai
ALEXANDRIA
5051 Sea
6
101028,80
402 Shanghai
ALEXANDRIA
5043 Sea
3
59529,00
104 Shanghai
ALEXANDRIA
ALEXANDRIA CAIRO
MSC TERESA #MSCUKU746 042 HS PARIS #SGL468168 EK140/04 EK923/05 #17634870415 EY873/04 EY653/05 #60775035590 LH8290/07 #02099051794 MS1584/06 MS541/07 #07796229836 MSC SEATTLE #MSCURU489 036 MSC SEATTLE # MSCURU4882 69 TIRUA #YMLUM2314 44319 TIRUA #YMLUM2314 44318 APL OREGON #SEL0679868 APL OREGON #SEL0679343 AF341/04 AF570/06 #05752956455 CV6356 + CV8501 #17219380896 MP8910/08 #07456280814 MS798/06 #07792598925 LH7105S/08 LH8290/09 #02099051886 MSC BILBAO #MSCURU409 968 MS1584/10 MS541/10 #07796229840 EVER SAFETY #YMLUM2314 41082 EVER SAFETY #YMLUM2314 41083 ITAL CONTESSA #EGLV142751 545238
2017-03-26
2017-03-27
2017-04-30
2017-05-01
2017-05-10
2017-05-09 40; 41; 42
2017-04-19
2017-04-19
2017-05-01
2017-05-01
2017-05-11
2017-05-04
2017-05-04
2017-05-05
2017-05-05
2017-05-10
2017-05-09 00; 00C ; 10MA ; 20PSB; 40MA ; 4X 2017-05-09 31MB ; 32MB ; 41MB
2017-05-04
2017-05-04
2017-05-05
2017-05-05
2017-05-10
2017-05-09 11UHA
2017-05-07
2017-05-07
2017-05-07
2017-05-08
2017-05-12
2017-05-09 00
2017-05-06
2017-05-06
2017-05-07
2017-05-07
2017-05-12
2017-05-09 41MB
2017-04-12
2017-04-15
2017-05-01
2017-05-01
2017-05-11
2017-05-09 10URA; 30MA ; 40MKA
2017-04-12
2017-04-15
2017-05-01
2017-05-01
2017-05-11
2017-05-10 00; 10LCB; 20MA ; 30MA ; 3X; 40MA ; 4X
2017-04-06
2017-04-07
2017-05-05
2017-05-06
2017-05-15
2017-05-11 41UHA
2017-04-06
2017-04-07
2017-05-05
2017-05-06
2017-05-15
2017-05-11 42UHA
2017-04-11
2017-04-10
2017-05-08
2017-05-06
2017-05-18
2017-05-11 00
2017-04-11
2017-04-10
2017-05-08
2017-05-06
2017-05-18
2017-05-12 41UHA
2017-05-04
2017-05-04
2017-05-06
2017-05-06
2017-05-11
2017-05-12 00URA; 10UBA; 22MK ; 32MKA; 42MBR
2017-05-06
2017-05-06
2017-05-08
2017-05-09
2017-05-13
2017-05-12 00
2017-05-08
2017-05-08
2017-05-08
2017-05-09
2017-05-13
2017-05-12 00; 10; 11; 12; 20; 21; 22; 30; 31; 32; 40; 41; 42
2017-05-06
2017-05-06
2017-05-06
2017-05-06
2017-05-11
2017-05-12 41UBA
2017-05-08
2017-05-08
2017-05-09
2017-05-10
2017-05-14
2017-05-12 00URA
2017-04-05
2017-04-06
2017-04-26
2017-04-26
2017-05-06
2017-05-12 41UHA
2017-05-10
2017-05-10
2017-05-10
2017-05-10
2017-05-15
2017-05-13 31MB ; 32MB
2017-04-02
2017-04-03
2017-05-08
2017-05-08
2017-05-18
2017-05-14 41UHA
2017-04-02
2017-04-03
2017-05-08
2017-05-08
2017-05-18
2017-05-14 11UHA
2017-04-02
2017-04-04
2017-05-08
2017-05-08
2017-05-18
2017-05-14 00
4930 Air
1
133,00
1 Istanbul
CAIRO
3603 Air
1
51,00
0 Br端ssel
CAIRO
5092 Sea
1
5380,00
67 Shanghai
ALEXANDRIA
5037 Sea
6
84282,00
415 Shanghai
ALEXANDRIA
5210 Air
2
5394,00
14 D端sseldorf
CAIRO
5203 Air
7
437,60
3 D端sseldorf
CAIRO
5208 Air
1
3,00
0 Amsterdam
CAIRO
5127 Sea
3
11056,03
5124 Sea
7
83815,16
342 Nhava Sheva
DAMIETTA
5094 Sea
7
103700,00
319 Nhava Sheva
DAMIETTA
5020 Sea 5234 Air
6 6
26480,00 1650,00
29 Ulsan 12 Frankfurt
5229 Air
1
1800,00
4 Frankfurt
5080 Sea
40
355875,38
5074 Sea
2
51120,00
5169 Air
1
295,50
1 Mumbai
CAIRO
5224 Air
2
144,00
1 Prag
CAIRO
5230 Air
1
85,00
0 D端sseldorf
CAIRO
5228 Air
1
101,00
1 Prag
CAIRO
3601 Sea
2
134,60
1 Hamburg
ALEXANDRIA
5225 Air
1
75,00
0 Prag
CAIRO
5237 Air
2
144,00
1 Prag
CAIRO
62 Busan
ALEXANDRIA
ALEXANDRIA CAIRO
CAIRO
984 Busan
ALEXANDRIA
123 Ulsan
ALEXANDRIA
TK092/10 #23564914463 MS726/07 #07796173615 EVER SAFETY #YMLUM2314 41081 EVER SAFETY #YMLUM2314 41086 LH7103/10 LH8290/11 #02099051864 AF341/10 AF570/11 #05752956470 MP8140/11 #07456281175 APL OREGON #SEL0679871 MEHUIN #CAD0294073 MEHUIN #CAD0293263 DA CUI YUN # MS1584/13 MS541/14 #07796229873 MS1584/13 MS541/14 #07796229851 LINAH #SEL0677880 DA CUI YUN #DCY33UKAE0 3 QR8603/12 QR1303/14 #15707649353 EK140/12 EK923/13 #17634608836 MS1520/12 MS541/14 #07796229862 EK140/12 EK923/13 #17634608825 MSC LAUSANNE #MSCURU563 608 EK140/17 EK932/18 #17634608862 EK140/18 EK923/18 #17634608873
2017-05-10
2017-05-10
2017-05-10
2017-05-10
2017-05-15
2017-05-14 22UBA
2017-05-07
2017-05-07
2017-05-07
2017-05-07
2017-05-12
2017-05-14 11UHA
2017-04-02
2017-04-03
2017-05-08
2017-05-08
2017-05-18
2017-05-15 42UHA
2017-04-02
2017-04-03
2017-05-08
2017-05-08
2017-05-18
2017-05-15 41UHA; 42UHA
2017-05-10
2017-05-10
2017-05-11
2017-05-12
2017-05-16
2017-05-15 21C ; 22C
2017-05-10
2017-05-10
2017-05-12
2017-05-12
2017-05-17
2017-05-15 00
2017-05-11
2017-05-11
2017-05-11
2017-05-11
2017-05-16
2017-05-15 11UHA
2017-04-11
2017-04-10
2017-05-08
2017-05-05
2017-05-18
2017-05-16 00
2017-04-24
2017-04-24
2017-05-03
2017-05-03
2017-05-13
2017-05-17 00
2017-04-24
2017-04-24
2017-05-03
2017-05-03
2017-05-13
2017-05-17 00
2017-03-23 2017-05-13
2017-03-31 2017-05-13
2017-05-09 2017-05-14
2017-05-08 2017-05-14
2017-05-19 2017-05-19
2017-05-18 42UHA 2017-05-18 21MB ; 22MB
2017-05-13
2017-05-13
2017-05-14
2017-05-14
2017-05-19
2017-05-18 11C
2017-03-30
2017-03-30
2017-05-08
2017-05-05
2017-05-18
2017-05-18 00
2017-03-27
2017-03-31
2017-05-09
2017-05-08
2017-05-19
2017-05-18 20PAC
2017-05-12
2017-05-12
2017-05-14
2017-05-14
2017-05-19
2017-05-19 00
2017-05-12
2017-05-12
2017-05-13
2017-05-15
2017-05-18
2017-05-19 42MB
2017-05-12
2017-05-12
2017-05-14
2017-05-14
2017-05-19
2017-05-20 00URA
2017-05-12
2017-05-12
2017-05-13
2017-05-14
2017-05-18
2017-05-20 42MB
2017-04-28
2017-04-28
2017-05-14
2017-05-14
2017-05-24
2017-05-21 30BAA
2017-05-17
2017-05-17
2017-05-18
2017-05-18
2017-05-23
2017-05-21 42MB
2017-05-18
2017-05-18
2017-05-19
2017-05-19
2017-05-24
2017-05-21 42MB
5150 Sea
4
17010,00
45 Hamburg
ALEXANDRIA
5097 Sea
6
128564,08
230 Hamburg
ALEXANDRIA
5137 Sea
5
35200,00
221 Antwerpen
ALEXANDRIA
5098 Sea
15
18551,92
5035 Sea
12
21345,00
104 Nhava Sheva
DAMIETTA
5132 Sea
39
22669,00
309 Hamburg
ALEXANDRIA
5088 Sea
1
8848,00
67 Busan
ALEXANDRIA
5143 Sea
8
3098,00
10 Chennai
DAMIETTA
98 Rijeka
ALEXANDRIA
3598 Sea
1
35,65
5151 Sea
20
34762,50
0 Rijeka
ALEXANDRIA
100 Hamburg
ALEXANDRIA
5082 Sea
29
28020,00
64 Busan
5236 Air
1
963,23
1 Genua
5122 Sea
6
89436,70
5142 Sea
1
8636,00
5180 Sea
28
12811,00
5222 Air
12
4148,21
5144 Sea
4
13347,00
5243 Air
2
575,00
5247 Air
6
1650,00
3605 Air
2
100,00
1 Düsseldorf
CAIRO
5238 Air
1
915,00
2 Frankfurt
CAIRO
ALEXANDRIA CAIRO
402 Shanghai
ALEXANDRIA
67 Houston
ALEXANDRIA
34 Hamburg
ALEXANDRIA
10 Düsseldorf
CAIRO
96 Ho Chi Minh
ALEXANDRIA
0 Amsterdam
12 Frankfurt
CAIRO
CAIRO
MSC LAUSANNE #MSCURU549 987 MSC LAUSANNE #MSCURU500 394 GRANDE TOGO #S312891822 AS CYPRIA #RJK0112234 CMA CGM INDUS #AMC0549222
2017-04-28
2017-04-28
2017-05-15
2017-05-14
2017-05-25
2017-05-21 30BFT; 40BFT
2017-04-28
2017-04-28
2017-05-14
2017-05-14
2017-05-24
2017-05-21 30BAT; 40BAT
2017-04-28
2017-05-02
2017-05-11
2017-05-11
2017-05-21
2017-05-22 40PAC
2017-04-26
2017-04-26
2017-05-16
2017-05-15
2017-05-26
2017-05-22 30BAT
2017-05-02
2017-05-02
2017-05-14
2017-05-14
2017-05-24
2017-05-23 20LCB
RIO DE LA PLATA #SGL465538 MSC CAMILLE #MSCUKU762 684 YM UBERTY #YMLUM5150 68695 AS CYPRIA #RJK0112235 RIO DE LA PLATA #SGL475902
2017-05-03
2017-05-03
2017-05-16
2017-05-16
2017-05-26
2017-05-23 30BAA
2017-04-12
2017-04-12
2017-05-15
2017-05-15
2017-05-25
2017-05-23 42UHA
2017-04-26
2017-04-26
2017-05-17
2017-05-17
2017-05-27
2017-05-23 41UHA; 42UHA
2017-04-26
2017-04-26
2017-05-16
2017-05-15
2017-05-26
2017-05-23 30BAT
2017-05-03
2017-05-03
2017-05-16
2017-05-16
2017-05-26
MSC CAMILLE #MSCUKU762 866 LH279/18 LH8290/18 #02095508280 E.R. TIANSHAN #YMLUM2314 45206 LIVERPOOL EXPRESS #HLCUHOU17 0444042 RIO MADEIRA #SGL486856 MS1520/19 MS541/21 #07796229895 YM INTELLIGENT #YMLUM4903 03626 MS1534/20 MS521/21 #07796678772 LH8290/23 #02099051971 AF341/11 AF789/13 #05752956503 LH8290/18 #02099051934
2017-04-12
2017-04-12
2017-05-16
2017-05-15
2017-05-26
2017-05-23 00C ; 20C ; 20PAH; 30BAB; 30LCA; 30MA ; 30PGB; 30UBA; 31UBA; 32UBA; 40BAB; 40LCL; 4X 2017-05-23 40; 41; 42
2017-05-18
2017-05-18
2017-05-18
2017-05-18
2017-05-23
2017-05-23 00URA
2017-04-13
2017-04-14
2017-05-18
2017-05-20
2017-05-28
2017-05-24 41UHA
2017-04-25
2017-04-25
2017-05-20
2017-05-21
2017-05-30
2017-05-25 41UHA
2017-05-10
2017-05-11
2017-05-20
2017-05-21
2017-05-30
2017-05-18
2017-05-18
2017-05-21
2017-05-21
2017-05-26
2017-05-25 1X; 20LCB; 2X; 30BTA; 30LAC; 3X; 4X 2017-05-25 00C ; 00EKH; 10MA ; 11UBA; 21MK ; 32MB
2017-04-18
2017-04-18
2017-05-19
2017-05-20
2017-05-29
2017-05-25 42UHA
2017-05-20
2017-05-20
2017-05-21
2017-05-21
2017-05-26
2017-05-26 11UHA
2017-05-23
2017-05-23
2017-05-24
2017-05-24
2017-05-29
2017-05-26 11MB ; 12MB
2017-05-12
2017-05-12
2017-05-14
2017-05-14
2017-05-19
2017-05-26 00URA
2017-05-18
2017-05-18
2017-05-18
2017-05-18
2017-05-23
2017-05-26 21C
5241 Air
1
39,00
0 Incheon
5131 Sea
7
8877,51
5140 Sea 3608 Air
4 3
69720,00 210,00
284 Antwerpen 1 Düsseldorf
ALEXANDRIA CAIRO
5147 Sea 5086 Sea 2958 Air
1 5 2
9983,00 29396,00 3430,00
41 Antwerpen 150 Antwerpen 20 Frankfurt
ALEXANDRIA ALEXANDRIA CAIRO
5212 Air
4
313,00
1 Düsseldorf
CAIRO
5232 Air
10
1995,20
5 Düsseldorf
CAIRO
5146 Sea
17
20622,20
5133 Sea
15
11933,00
2959 Air
1
180,00
5166 Sea
6
19000,00
5235 Air
7
1295,70
5248 Air
1
2,40
5167 Sea
5
41066,40
5242 Sea
1
120,00
5165 Sea
14
196770,28
5178 Sea
12
5179 Sea
28 Busan
93 Jebel Ali Port 117 Hamburg
1 Düsseldorf
153 Hamburg
CAIRO
ALEXANDRIA
ALEXANDRIA ALEXANDRIA
CAIRO
ALEXANDRIA
5 Düsseldorf
CAIRO
0 Wien
CAIRO
335 Shanghai 0 Düsseldorf
ALEXANDRIA CAIRO
QR8983/21 QR1301/22 #15708309000 XIN TIAN JIN #SEL0681205 CELINE #031 LH7105/20 LH8290/21 #02099051945 CELINE #030 CELINE #029 KL8440/12 MP8910/16 MP8 #07453010635 AF341/15 AF570/18 #05752956492 MS1520/18 MS541/19 #07796229906 AL HILAL #DXB0357181 MSC ADELAIDE #MSCURU500 246 AF361/11 AF570/12 #05752956481 MSC ADELAIDE #MSCURU587 425 MS1520/24 MS541/26 #07796595004 MS798/25 #07792599091 YM UBERTY #YMLUM2314 50649 MS1520/26 MS541/28 #07796595030 YM UBERTY #YMLUM2314 49561 SUEZ CANAL #AMC0550992
2017-05-21
2017-05-21
2017-05-22
2017-05-22
2017-05-27
2017-05-26 00
2017-04-17
2017-04-17
2017-05-22
2017-05-22
2017-06-01
2017-05-28 00
2017-05-05 2017-05-20
2017-05-06 2017-05-19
2017-05-18 2017-05-21
2017-05-18 2017-05-22
2017-05-28 2017-05-26
2017-05-28 10UEN 2017-05-28 00URA
2017-05-05 2017-05-05 2017-05-12
2017-05-06 2017-05-06 2017-05-12
2017-05-18 2017-05-18 2017-05-16
2017-05-18 2017-05-18 2017-05-16
2017-05-28 2017-05-28 2017-05-21
2017-05-28 20PAH 2017-05-28 40MA 2017-05-28 00MA
2017-05-15
2017-05-15
2017-05-18
2017-05-18
2017-05-23
2017-05-28 00URA; 10MA ; 22MBR; 32MKA
2017-05-18
2017-05-18
2017-05-19
2017-05-19
2017-05-24
2017-05-28 00C ; 00URA; 20MA ; 21MK ; 31MKA
2017-04-21
2017-04-27
2017-05-19
2017-05-22
2017-05-29
2017-05-28 42MBR
2017-05-03
2017-05-03
2017-05-22
2017-05-22
2017-06-01
2017-05-29 30BAA
2017-05-11
2017-05-11
2017-05-12
2017-05-12
2017-05-17
2017-05-29 00MB
2017-05-03
2017-05-03
2017-05-22
2017-05-22
2017-06-01
2017-05-30 42UHA
2017-05-24
2017-05-24
2017-05-26
2017-05-28
2017-05-31
2017-05-30 00C ; 00UEN; 42C
2017-05-25
2017-05-25
2017-05-25
2017-05-25
2017-05-30
2017-05-30 11CYE
2017-04-27
2017-04-27
2017-05-24
2017-05-27
2017-06-03
2017-05-31 42UHA
2017-05-26
2017-05-26
2017-05-28
2017-05-28
2017-06-02
2017-05-31 42MB
2017-04-27
2017-04-27
2017-05-24
2017-05-27
2017-06-03
2017-06-01 42UHA
2017-05-15
2017-05-16
2017-05-24
2017-05-28
2017-06-03
2017-06-02 30LCB
937 Shanghai
ALEXANDRIA
21345,00
104 Nhava Sheva
DAMIETTA
12
21345,00
104 Nhava Sheva
DAMIETTA
SUEZ CANAL #AMC0550962
2017-05-15
2017-05-16
2017-05-24
2017-05-28
2017-06-03
2017-06-02 40LCB
5199 Sea
2
26700,00
154 Hamburg
ALEXANDRIA
2017-05-10
2017-05-12
2017-05-27
2017-05-28
2017-06-06
2017-06-04 20MA
5141 Sea
3
36300,00
259 Hamburg
ALEXANDRIA
MSC ADELAIDE #MSCURU693 165 MSC ADELAIDE #MSCURU512 258
2017-05-11
2017-05-12
2017-05-27
2017-05-28
2017-06-06
2017-06-04 10UEN
5183 Sea
2
3758,00
9 Hamburg
ALEXANDRIA
5193 Sea
13
16642,00
64 Hamburg
ALEXANDRIA
5252 Air
1
120,00
0 Frankfurt
CAIRO
5244 Air
1
400,00
1 Chennai
CAIRO
5176 Sea
3
20820,00
42 Ulsan
ALEXANDRIA
5177 Sea
3
20820,00
42 Ulsan
ALEXANDRIA
5162 Sea
8
45726,86
213 Bulsan
ALEXANDRIA
5254 Air
1
8,90
5046 Sea
2
3564,15
5031 Sea
12
187370,28
5256 Air
1
3,80
3607 Air
1
2961 Air
0 Wien
CAIRO
7 Busan
ALEXANDRIA
803 Shanghai
ALEXANDRIA
0 Prag
CAIRO
158,00
1 D端sseldorf
CAIRO
3
74,21
0 D端sseldorf
CAIRO
5198 Sea
12
89915,00
803 Hamburg
ALEXANDRIA
5019 Sea 4986 Sea
24 5
3086000,00 85493,10
6641 Ulsan 339 Shanghai
ALEXANDRIA ABU KIR
5260 Air
1
0,23
5264 Air
1
130,00
5276 Air
2
5266 Air
5249 Air
0 Prag
CAIRO
0 Berlin
CAIRO
66,00
0 Leipzig
CAIRO
3
94,60
0 D端sseldorf
CAIRO
4
24,50
0 D端sseldorf
CAIRO
MSC ADELAIDE #MSCURU673 423 MSC ADELAIDE #MSCURU722 725 AF341/26 AF570/27 #05752956525 EY936/29 EY653/30 #60774687841 MSC PALOMA #960381668 MSC PALOMA #960381618 PUCON #SEL0683567 MS798/02 #07792599216 MSC DANIELA #MSCUKU734 618 MSC LIVORNO #MSCUU9682 958 EK140/31 EK923/01 #17634609035 AF363/01 AF570/03 #05752956536 MS1520/02 MS541/04 #07796595015 MSC SINDY #MSCURU719 481 DA CUI YUN # KBS STAR #KS1701SHAB U001 OS712/01 OS863/02 #02074987360 MS732/02 #07796595041 MS541/08 #07796595096 MS1520/02 MS541/08 #07796595074 MS1520/02 MS541/08 #07796595052
2017-05-11
2017-05-12
2017-05-27
2017-05-28
2017-06-06
2017-06-04 30PGB
2017-05-11
2017-05-12
2017-05-27
2017-05-28
2017-06-06
2017-06-04 1X; 20C ; 2X; 3X; 40MA ; 4X
2017-05-26
2017-05-26
2017-05-30
2017-05-30
2017-06-04
2017-06-04 22MB
2017-05-29
2017-05-29
2017-05-30
2017-05-30
2017-06-04
2017-06-04 11UHA
2017-04-30
2017-04-30
2017-05-31
2017-06-01
2017-06-10
2017-06-05 30LCB
2017-04-30
2017-04-30
2017-05-31
2017-06-01
2017-06-10
2017-06-05 40LCB
2017-04-30
2017-05-03
2017-06-03
2017-05-27
2017-06-13
2017-06-05 00
2017-06-02
2017-06-02
2017-06-02
2017-06-02
2017-06-07
2017-06-06 31BAT
2017-03-19
2017-03-19
2017-06-01
2017-06-01
2017-06-11
2017-06-07 00
2017-03-17
2017-03-17
2017-06-01
2017-06-01
2017-06-11
2017-06-08 32UHA
2017-05-31
2017-05-31
2017-06-01
2017-06-01
2017-06-06
2017-06-08 31BAA
2017-06-01
2017-06-01
2017-06-03
2017-06-03
2017-06-08
2017-06-08 30UBA
2017-06-02
2017-06-02
2017-06-04
2017-06-04
2017-06-09
2017-06-08 00MB
2017-05-17
2017-05-17
2017-06-05
2017-06-04
2017-06-15
2017-06-11 42UHA
2017-03-31 2017-04-08
2017-03-31 2017-04-08
2017-05-08 2017-05-31
2017-05-08 2017-05-31
2017-05-18 2017-06-10
2017-06-12 42UHA 2017-06-12 42UHA
2017-06-01
2017-06-01
2017-06-05
2017-06-04
2017-06-10
2017-06-12 31MB
2017-06-02
2017-06-02
2017-06-02
2017-06-02
2017-06-07
2017-06-12 21MB
2017-06-08
2017-06-08
2017-06-08
2017-06-08
2017-06-13
2017-06-12 00EKH
2017-06-08
2017-06-08
2017-06-08
2017-06-08
2017-06-13
2017-06-12 00EKH
2017-06-08
2017-06-08
2017-06-08
2017-06-08
2017-06-13
2017-06-12 00MA ; 11C ; 42MB
5272 Air
1
10,00
0 Düsseldorf
CAIRO
5271 Air
8
456,00
1 Amsterdam
CAIRO
2962 Air
1
68,00
1 Düsseldorf
CAIRO
5204 Sea
17
22660,00
77 Hamburg
ALEXANDRIA
2957 Sea
2
3430,00
20 Hamburg
ALEXANDRIA
5273 Air
5
23,00
5215 Sea
2
25337,00
5195 Sea
1
8446,00
5153 Sea
1
185000,00
5170 Sea
1
19035,00
5265 Air
1
6,00
0 Düsseldorf
CAIRO
5278 Air
1
57,00
0 Düsseldorf
CAIRO
5269 Air
1
1748,60
3 Wien
CAIRO
5274 Air
1
5,50
0 Hamburg
CAIRO
5267 Air
4
581,36
4 Düsseldorf
CAIRO
5201 Sea
4
367000,00
629 Rotterdam
5280 Air
1
2200,00
5287 Air
1
2963 Air
5283 Air
0 Leipzig
CAIRO
60 Nhava Sheva
ALEXANDRIA
67 Houston
ALEXANDRIA
156 Rotterdam 52 Nhava Sheva
BURULLUS ALEXANDRIA
BURULLUS
7 Frankfurt
CAIRO
46,00
0 Düsseldorf
CAIRO
1
14,00
0 Düsseldorf
CAIRO
1
46,00
0 Wien
CAIRO
MS1520/02 MS541/08 #07796595085 MS758/07 #07796681045 MS1520/01 MS541/02 #07796595063 MSC SINDY #MSCURU760 121 MSC SINDY #MSCURU748 357 MS1584/07 MS541/08 #07796595100 MAIPO #CAD0296960 NORTHERN DECENCY #HLCUHOU17 0519637 MITTELPLATE #MITT-RTMBUR-1 MAIPO #CAD0296070 LH7105S/07 LH8290/08 #02099052063 MS1520/08 MS541/09 #07796595122 MS9537T/08 MS541/11 #07792599312 MS798/09 #07792599323 AF341/09 AF570/11 #05752956551 MITTELPLATE #MITT-ROTBUR-2 CV6953/09 CV8501/12 #17223745901 MS1520/09 MS541/11 #07796595133 MS1520/09 MS541/11 #07796595111 MS798/10 #07792599371
2017-06-08
2017-06-08
2017-06-08
2017-06-08
2017-06-13
2017-06-12 40MA
2017-06-07
2017-06-07
2017-06-07
2017-06-07
2017-06-12
2017-06-12 11UHA; 12UHA; 21UHA; 31UHA; 41UHA; 42UHA
2017-06-02
2017-06-02
2017-06-04
2017-06-04
2017-06-09
2017-06-12 00
2017-05-17
2017-05-17
2017-06-03
2017-06-04
2017-06-13
2017-06-12 1X; 2X; 3X; 40LBF; 40MA ; 4X
2017-05-17
2017-05-17
2017-06-05
2017-06-04
2017-06-15
2017-06-12 00MA
2017-06-07
2017-06-07
2017-06-08
2017-06-08
2017-06-13
2017-06-12 00EKH
2017-05-29
2017-05-29
2017-06-07
2017-06-07
2017-06-17
2017-06-13 00
2017-05-11
2017-05-11
2017-06-11
2017-06-10
2017-06-21
2017-06-14 42UHA
2017-05-26
2017-05-26
2017-06-09
2017-06-08
2017-06-19
2017-06-14 11BAT
2017-05-29
2017-05-29
2017-06-07
2017-06-07
2017-06-17
2017-06-14 00
2017-06-07
2017-06-07
2017-06-08
2017-06-08
2017-06-13
2017-06-14 41MPR
2017-06-08
2017-06-08
2017-06-09
2017-06-08
2017-06-14
2017-06-14 22MK
2017-06-08
2017-06-08
2017-06-11
2017-06-11
2017-06-16
2017-06-14 00
2017-06-09
2017-06-09
2017-06-09
2017-06-09
2017-06-14
2017-06-14 42CYE
2017-06-09
2017-06-09
2017-06-11
2017-06-11
2017-06-16
2017-06-14 00; 00C ; 40MA ; 42MB
2017-05-26
2017-05-26
2017-06-09
2017-06-08
2017-06-19
2017-06-16 40MA
2017-06-09
2017-06-09
2017-06-13
2017-06-13
2017-06-18
2017-06-18 11BAT
2017-06-09
2017-06-09
2017-06-11
2017-06-11
2017-06-16
2017-06-18 21BTA
2017-06-09
2017-06-09
2017-06-11
2017-06-11
2017-06-16
2017-06-18 41MB
2017-06-10
2017-06-10
2017-06-10
2017-06-10
2017-06-15
2017-06-18 00UEN
5175 Sea
13
166896,09
870 Busan
ALEXANDRIA
5282 Air
1
4,00
5275 Air
2
14,67
5182 Sea
5
67680,00
482 Hamburg
ALEXANDRIA
5186 Sea
3
42340,00
289 Hamburg
ALEXANDRIA
5181 Sea
1
11830,00
96 Hamburg
ALEXANDRIA
5284 Air
2
62,50
5217 Sea
1
8420,00
77 Hamburg
ALEXANDRIA
5152 Sea
3
62791,02
115 Hamburg
ALEXANDRIA
5218 Sea
24
41437,50
148 Hamburg
ALEXANDRIA
3602 Sea
6
2525,00
5 Hamburg
ALEXANDRIA
5285 Air
5
842,00
3 Düsseldorf
CAIRO
5259 Air
10
3147,00
8 Düsseldorf
CAIRO
5286 Air
4
77,00
1 Amsterdam
CAIRO
5184 Sea 5223 Sea
5 2
83180,00 20429,00
281 Antwerpen 173 Nhava Sheva
ALEXANDRIA DAMIETTA
5233 Sea
2
26700,00
154 Hamburg
ALEXANDRIA
5231 Sea
32
37177,00
86 Hamburg
ALEXANDRIA
5251 Sea
2
15740,00
154 Hamburg
ALEXANDRIA
5289 Air
4
45,42
5189 Sea
2
818,07
2960 Sea
2
2090,00
0 Incheon
CAIRO
0 Prag
CAIRO
1 Prag
CAIRO
0 Düsseldorf
CAIRO
1 Busan
ALEXANDRIA
13 Hamburg
ALEXANDRIA
APL MINNESOTA #SEL0685634 BA018/11 BA155/12 #12532606582 OS712/09 OS863/12 #02074987500 MSC CHICAGO #MSCURU670 650 MSC CHICAGO #MSCURU670 726 MSC CHICAGO #MSCURU670 684 EK140/09 EK923/10 #17634609083 MSC CHICAGO #MSCURU763 166 MSC CHICAGO #MSCURU619 012 MSC CHICAGO #MSCURU805 652 MSC CHICAGO #MSCURU772 845 MS1520 + MS541 #07796595144 AF341/09 AF570/15 #05752956540 MS758/14 #07796682574 YM FUJI #019 MATAQUITO #AMC0555242
2017-05-08
2017-05-08
2017-06-02
2017-06-12
2017-06-12
2017-06-18 42UHA
2017-06-10
2017-06-10
2017-06-12
2017-06-12
2017-06-17
2017-06-19 32UHA
2017-06-09
2017-06-09
2017-06-12
2017-06-12
2017-06-17
2017-06-19 21MB ; 22MB
2017-05-24
2017-05-24
2017-06-10
2017-06-12
2017-06-20
2017-06-19 30UBA
2017-05-24
2017-05-24
2017-06-10
2017-06-12
2017-06-20
2017-06-19 30UBA; 31UBA; 32UBA
2017-05-24
2017-05-24
2017-06-10
2017-06-12
2017-06-20
2017-06-19 30UBA
2017-06-09
2017-06-09
2017-06-10
2017-06-10
2017-06-15
2017-06-20 41MB ; 42MB
2017-05-24
2017-05-24
2017-06-10
2017-06-12
2017-06-20
2017-06-20 30UBA
2017-05-24
2017-05-24
2017-06-10
2017-06-12
2017-06-20
2017-06-20 11BAT
2017-05-24
2017-05-24
2017-06-10
2017-06-12
2017-06-20
2017-06-20 00; 00C ; 10PAC; 30MA ; 40MA
2017-05-24
2017-05-24
2017-06-10
2017-06-12
2017-06-20
2017-06-20 30BTA; 30MA
2017-06-14
2017-06-14
2017-06-15
2017-06-15
2017-06-20
2017-06-21 00C ; 10C ; 42MB ; 42MPR
2017-06-15
2017-06-15
2017-06-15
2017-06-15
2017-06-20
2017-06-21 00; 10MA ; 42MB
2017-06-14
2017-06-14
2017-06-14
2017-06-14
2017-06-19
2017-06-21 00
2017-05-31 2017-06-05
2017-05-30 2017-06-05
2017-06-13 2017-06-14
2017-06-12 2017-06-15
2017-06-23 2017-06-24
2017-06-21 30LAC; 40MA 2017-06-21 12MBR
MSC CHICAGO #MSCURU806 387 MSC BILBAO #MSCURU862 422 RIO DE LA PLATA #SGL534944 MS1520 + MS541 #07796595155 MSC TARANTO #MSCUKU818 130
2017-05-24
2017-05-24
2017-06-10
2017-06-12
2017-06-20
2017-06-21 10MA
2017-05-31
2017-05-31
2017-06-17
2017-06-18
2017-06-27
2017-06-07
2017-06-09
2017-06-17
2017-06-18
2017-06-27
2017-06-23 00; 00C ; 10C ; 1X; 20C ; 2X; 30C ; 30LCB; 30MA ; 31C ; 32C ; 40C ; 40LCB; 40MA 2017-06-23 11BAT
2017-06-14
2017-06-14
2017-06-15
2017-06-15
2017-06-20
2017-06-23 11MKC; 42MB
2017-05-07
2017-05-07
2017-06-13
2017-06-14
2017-06-23
2017-06-23 00
MSC BILBAO #MSCURU862 588
2017-05-31
2017-05-31
2017-06-17
2017-06-18
2017-06-27
2017-06-29 00MA
5292 Air
4
288,00
1 Budapest
5294 Air
4
6730,00
5291 Air
2
1184,00
1 Genua
CAIRO
5261 Sea
1
1604,00
6 Gemlik
ALEXANDRIA
5246 Sea
3
4600,00
15 Hamburg
ALEXANDRIA
5220 Sea
15
11933,00
124 Hamburg
ALEXANDRIA
5207 Sea
5
1090,00
3 Busan
ALEXANDRIA
5268 Air
1
153,00
2 Lissabon
CAIRO
5295 Air
2
20,00
0 D端sseldorf
CAIRO
5293 Air
3
93,60
0 D端sseldorf
CAIRO
5279 Air
1
199,00
1 Chennai
CAIRO
3606 Sea
2
134,60
1 Hamburg
ALEXANDRIA
5281 Air
1
29,00
0 Shanghai
CAIRO
5214 Sea
3
1224,00
6 Lissabon
ALEXANDRIA
5245 Sea
33
29141,00
96 Hamburg
ALEXANDRIA
5138 Sea
100
106000,00
139 Hamburg
ALEXANDRIA
3611 Air
1
127,00
0 D端sseldorf
CAIRO
5290 Sea
1
671,86
1 Hamburg
ALEXANDRIA
5304 Air
3
70,60
0 D端sseldorf
CAIRO
5308 Air
2
10,45
0 Prag
CAIRO
22 Wien
CAIRO CAIRO
KL8570 + MP8910 #07456587904 LH8290/22 #02099052111 LH247/22 LH8290/22 #02077354303 MSC JENNY #MSCURU912 334 MSC RANIA #MSCURU885 126 MSC RANIA #MSCURU783 628 MSC CLORINDA #MSCUKU835 258 AF685M + AF570 #05749385486 MS15220/22 MS541/21 #07796595170 MS1520/22 MS541/23 #07796595166 EY972/23 EY653/25 #60775259575 MSC RANIA #MSCURU784 527 EK9873/18 EK0927/19 #17654253091 MSC ULSAN #MSCULJ3198 33 MSC RANIA #MSCURU896 974
2017-06-15
2017-06-15
2017-06-22
2017-06-22
2017-06-27
2017-07-04 10MA ; 20MA ; 30MA ; 40MA
2017-06-22
2017-06-22
2017-06-22
2017-06-23
2017-06-27
2017-07-04 11BAT
2017-06-22
2017-06-22
2017-06-22
2017-06-23
2017-06-27
2017-07-04 00URA; 20URA
2017-06-13
2017-06-11
2017-06-21
2017-06-23
2017-07-01
2017-07-04 20SGC
2017-06-07
2017-06-07
2017-06-23
2017-06-26
2017-07-03
2017-07-04 40PAA
2017-06-07
2017-06-07
2017-06-23
2017-06-26
2017-07-03
2017-07-04 40BAA
2017-05-21
2017-05-21
2017-06-22
2017-06-21
2017-07-02
2017-07-04 00
2017-06-14
2017-06-14
2017-06-19
2017-06-19
2017-06-24
2017-07-04 12C
2017-06-22
2017-06-22
2017-06-23
2017-06-25
2017-06-28
2017-07-04 10MA ; 22MPR
2017-06-22
2017-06-22
2017-06-23
2017-06-23
2017-06-28
2017-07-04 00URA; 21MB ; 21MK
2017-06-23
2017-06-23
2017-06-25
2017-06-25
2017-06-30
2017-07-04 11UHA
2017-06-07
2017-06-07
2017-06-23
2017-06-26
2017-07-03
2017-07-05 40BAA
2017-06-18
2017-06-18
2017-06-19
2017-06-19
2017-06-24
2017-07-05 21BBT
2017-06-05
2017-06-05
2017-06-15
2017-06-18
2017-06-25
2017-07-06 00C ; 10C ; 20C
2017-06-07
2017-06-07
2017-06-23
2017-06-26
2017-07-03
MSC RANIA #MSCURU512 514 EY074/30 EY653/01 #60774624631 MONTE ALEGRE #SGL539327 MS1520/22 MS541/23 #07796595181 EK140/23 EK927/25 #17634609131
2017-06-07
2017-06-07
2017-06-23
2017-06-26
2017-07-03
2017-07-06 00; 00EKH; 12UBA; 30C ; 30LDK; 30MA ; 3X; 40C ; 40LDK; 40MA ; 40UBA; 41UBA; 42UBA; 4X 2017-07-06 00
2017-06-30
2017-06-30
2017-06-01
2017-07-01
2017-06-06
2017-07-10 12BAC
2017-06-21
2017-06-21
2017-07-01
2017-07-02
2017-07-11
2017-07-10 00
2017-06-22
2017-06-22
2017-06-23
2017-06-25
2017-06-28
2017-07-10 42MB
2017-06-23
2017-06-23
2017-06-25
2017-06-26
2017-06-30
2017-07-10 32MB ; 42MB
5307 Air
1
181,00
1 Wien
CAIRO
5312 Air
1
529,68
1 Wien
CAIRO
5321 Air
1
0,10
0 Amsterdam
CAIRO
5314 Air
1
1,33
0 Prag
CAIRO
5320 Air
1
2,50
0 Prag
CAIRO
5310 Air
1
40,00
0 Incheon
CAIRO
5309 Air
10
2034,53
6 Düsseldorf
CAIRO
5300 Air
6
1978,80
6 Düsseldorf
CAIRO
5270 Sea
2
16583,26
23 Hamburg
ALEXANDRIA
5219 Sea
309 Hamburg
ALEXANDRIA
39
22669,00
5322 Air
1
127,00
2 Milano
CAIRO
5319 Air
1
445,00
1 Mailand
CAIRO
6103 Air
2
2,70
0 Wien
CAIRO
6105 Air
1
1,90
0 Wien
CAIRO
3612 Air
1
155,00
1 Düsseldorf
CAIRO
6100 Air
1
15,50
0 Leipzig
CAIRO
5311 Air
1
4,00
0 Düsseldorf
CAIRO
5324 Air
4
403,08
3 Düsseldorf
CAIRO
23
10169,00
17 Hamburg
2
41,50
0 Amsterda
3610 Sea
6102 Air
ALEXANDRIA
CAIRO
MS9537T/23 MS541/28 #07796694640 MS9537T/28 MS537/30 #07796694684 MP8140/29 #07458243905 EK140/28 EK927/30 #17663497792 EK140/29 EK927/01 #17651853675 EY873/30 EY653/01 #60775896413 MS1520/30 MS541/02 #07796595214 MS1520/26 MS541/28 #07796595192 RIO MADEIRA #SGL537453 RIO MADEIRA #SGL541613 MS533/08 #07796040000 MS533/08 #07796039996 MS798/06 #07796694846 MS798/07 #07796694765 KL8440/04 MP8140/06 #07453010661 MS1598/04 MS541/05 #07796595240 MS1520/29 MS541/30 #07796595203 MS1520/06 MS541/07 #07796595236 MSC PORTUGAL #MSCURU926 524 MS758/08 #07796685551
2017-06-23
2017-06-23
2017-06-28
2017-06-25
2017-07-03
2017-07-10 10SGY
2017-06-28
2017-06-25
2017-06-30
2017-06-30
2017-07-05
2017-07-10 00
2017-06-29
2017-06-29
2017-06-29
2017-06-29
2017-07-04
2017-07-10 00UEN
2017-06-28
2017-06-28
2017-06-30
2017-06-30
2017-07-05
2017-07-10 31MB
2017-06-29
2017-06-29
2017-07-01
2017-07-01
2017-07-06
2017-07-10 42MB
2017-06-30
2017-06-30
2017-07-01
2017-07-01
2017-07-06
2017-07-10 00
2017-06-30
2017-06-30
2017-07-02
2017-07-02
2017-07-07
2017-07-11 00C ; 12MB ; 21MB ; 22C ; 31MKA; 40URA; 42MB ; 42UBA
2017-06-24
2017-06-26
2017-06-28
2017-06-28
2017-07-03
2017-07-11 00; 00C ; 21MBR; 21XKA; XX
2017-06-16
2017-06-16
2017-06-24
2017-06-25
2017-07-04
2017-07-11 00
2017-06-16
2017-06-16
2017-06-24
2017-06-25
2017-07-04
2017-07-11 40BAA
2017-07-08
2017-07-08
2017-07-08
2017-07-08
2017-07-13
2017-07-11 21MBV
2017-07-08
2017-07-08
2017-07-08
2017-07-08
2017-07-13
2017-07-11 00
2017-07-06
2017-07-06
2017-07-06
2017-07-06
2017-07-11
2017-07-12 99UBA
2017-07-07
2017-07-07
2017-07-07
2017-07-07
2017-07-12
2017-07-12 21CYE
2017-07-04
2017-07-04
2017-07-06
2017-07-06
2017-07-11
2017-07-12 00URA
2017-07-04
2017-07-04
2017-07-05
2017-07-05
2017-07-10
2017-07-12 00EKH
2017-06-29
2017-06-29
2017-06-30
2017-06-30
2017-07-05
2017-07-12 00
2017-07-06
2017-07-06
2017-07-07
2017-07-07
2017-07-12
2017-07-12 00; 00C ; 00EKH; 32UBA
2017-06-15
2017-06-14
2017-07-02
2017-07-02
2017-07-12
2017-07-12 40BTA; 40MA
2017-07-08
2017-07-08
2017-07-08
2017-07-09
2017-07-13
2017-07-12 00
5302 Air
2
470,00
4 Dubai
CAIRO
5227 Sea
4
78983,00
5197 Sea
3
227000,00
5239 Sea
1
16800,00
5262 Sea
116
28536,00
317 Hamburg
ALEXANDRIA
5255 Sea
25
21734,00
68 Hamburg
ALEXANDRIA
6104 Air
2
292,10
2 Düsseldorf
CAIRO
5326 Air
2
72,65
0 Düsseldorf
CAIRO
5323 Air
3
255,00
1 Prag
CAIRO
6109 Air
3
242,00
1 Düsseldorf
CAIRO
6106 Air
5
348,10
2 Düsseldorf
CAIRO
5240 Sea
1
6061,00
69 Laem Chabang ALEXANDRIA
5250 Sea
2
7140,00
85 Antwerpen
ALEXANDRIA
5263 Sea
1
4990,00
15 Nhava Sheva
DAMIETTA
5325 Air
1
3,00
0 Düsseldorf
CAIRO
6101 Air
6
946,20
3 Düsseldorf
CAIRO
5328 Air
1
6360,00
38 Shanghai
CAIRO
5317 Air
1
6000,00
33 Shanghai
CAIRO
6114 Air
1
2,10
5329 Air
1
8180,00
251 Antwerpen
ALEXANDRIA
298 3rd May Shipyard
BURULLUS
32 Antwerpen
0 Wien 25 Shanghai
ALEXANDRIA
CAIRO CAIRO
EK923/06 #17652837610 PALENCIA #026 CONSTANCE #CONS-RIJBUR1 PALENCIA #021 MONTE ALEGRE #SGL538416 MONTE ALEGRE #SGL549235 AF341M/07 AF570/09 #05752956573 MS1250/07 MS541/09 #07796595262 MS1597/10 MS541/12 #07796595251 MS1520/11 MS541/12 #07796595273 MS1520/11 MS541/12 #07796595295 MSC GIANNA #MSCUW7383 711 GRANDE TOGO #S313217798 CMA CGM INDIUS #CAD0299425 OS154/04 LH1243/05 LH82 #02099052166 AF341/11 AF570/13 #05752956562 AZG032/13 AZQ4401/17 #50100775832 AZG032/13 AZQ4401/17 #50100775821 MS798/14 #07796695001 AZG042/17 AZQ4403/19 #50100775843
2017-07-06
2017-07-06
2017-07-06
2017-07-06
2017-07-11
2017-07-12 22MBR
2017-06-19
2017-06-21
2017-07-07
2017-07-06
2017-07-17
2017-07-13 30PAH; 40LAC
2017-07-07
2017-07-07
2017-07-12
2017-07-13
2017-07-22
2017-07-13 40BAT
2017-06-19
2017-06-21
2017-07-07
2017-07-06
2017-07-17
2017-07-13 40MA
2017-06-21
2017-06-21
2017-07-01
2017-07-02
2017-07-11
2017-07-13 00
2017-06-21
2017-06-21
2017-07-01
2017-07-02
2017-07-11
2017-07-14 00C ; 30C ; 40C ; 40PGB
2017-07-07
2017-07-07
2017-07-09
2017-07-09
2017-07-14
2017-07-15 00EKH; 30C
2017-07-07
2017-07-07
2017-07-09
2017-07-09
2017-07-14
2017-07-15 00C ; 12BAT
2017-07-10
2017-07-10
2017-07-12
2017-07-10
2017-07-17
2017-07-15 12MB ; 22MB ; 32MB
2017-07-11
2017-07-11
2017-07-12
2017-07-12
2017-07-17
2017-07-15 00EKH
2017-07-11
2017-07-11
2017-07-12
2017-07-12
2017-07-17
2017-07-15 00EKH; 10MA ; 11C ; 30C ; 42C
2017-06-02
2017-06-03
2017-07-04
2017-07-03
2017-07-14
2017-07-15 11UHA
2017-06-27
2017-06-28
2017-07-07
2017-07-10
2017-07-17
2017-07-16 30QU
2017-06-26
2017-06-26
2017-07-05
2017-07-06
2017-07-15
2017-07-16 00
2017-07-04
2017-07-04
2017-07-07
2017-07-10
2017-07-12
2017-07-16 00
2017-07-11
2017-07-11
2017-07-13
2017-07-13
2017-07-18
2017-07-18 00EKH; 00URA; 21XKA; 22MK ; 40MA ; 99UBA
2017-07-13
2017-07-13
2017-07-17
2017-07-17
2017-07-22
2017-07-18 32UHA
2017-07-13
2017-07-13
2017-07-17
2017-07-17
2017-07-22
2017-07-18 32UHA
2017-07-14
2017-07-14
2017-07-14
2017-07-14
2017-07-19
2017-07-20 99UBA
2017-07-17
2017-07-17
2017-07-19
2017-07-19
2017-07-24
2017-07-20 32UHA
5327 Air
1
8220,00
33 Shanghai
CAIRO
6108 Air
2
4366,00
11 Kelsterbach
CAIRO
6111 Air
1
74,00
1 Prag
CAIRO
6110 Air
1
69,00
0 Amsterdam
CAIRO
6113 Air
1
1,35
0 Düsseldorf
CAIRO
3609 Air
3
258,20
1 Düsseldorf
CAIRO
20
17140,60
68 Hamburg
6107 Air
2
34,00
0 Bangkok
5316 Sea
2
24100,00
5277 Sea
1
6116 Air
5226 Sea
ALEXANDRIA CAIRO
135 Rotterdam
ALEXANDRIA
8895,00
77 Hamburg
ALEXANDRIA
5
1434,00
11 Düsseldorf
CAIRO
6117 Air
1
185,00
5216 Sea
2
51120,00
5288 Sea
3
6150,00
27 Hamburg
ALEXANDRIA
5296 Sea
15
23181,00
59 Hamburg
ALEXANDRIA
0 Amsterdam
123 Busan
CAIRO
ALEXANDRIA
AZG042/17 AZQ4403/19 #50100775854 MS1584/14 MS541/14 #07796595284 EK140/14 EK927/16 #17651853771 MS1534/15 MS521/16 #07796686365 MS1520/14 MS541/16 #07796595306 KL8440/14 MP8910/17 #07453010672 HS PARIS #SGL540440 MS961/19 #07796780434 E.R. YOKOHAMA #MSCUOJ1052 19 MSC ATHENS #MSCURU991 692 MS1520/18 MS541/19 #07796595321 MS1534/19 MS521/20 #07796686800 BASLE EXPRESS #HLCUSEL170 538445 MSC ATHENS #MSCUOJ0033 98 MSC ATHENS #MSCUOJ0725 00
2017-07-17
2017-07-17
2017-07-19
2017-07-19
2017-07-24
2017-07-20 32UHA
2017-07-14
2017-07-14
2017-07-14
2017-07-16
2017-07-19
2017-07-20 00
2017-07-14
2017-07-14
2017-07-16
2017-07-16
2017-07-21
2017-07-20 42BAA
2017-07-15
2017-07-15
2017-07-16
2017-07-16
2017-07-21
2017-07-20 12MBL
2017-07-14
2017-07-14
2017-07-16
2017-07-16
2017-07-21
2017-07-20 42MB
2017-07-14
2017-07-14
2017-07-17
2017-07-17
2017-07-22
2017-07-20 00; 22MK ; 40UBA
2017-06-28
2017-06-29
2017-07-08
2017-07-08
2017-07-18
2017-07-19
2017-07-19
2017-07-19
2017-07-19
2017-07-24
2017-07-20 00URA; 30LAC; 30PAH; 30PDB; 40C ; 40LAC; 40MA 2017-07-22 11UHA
2017-07-03
2017-07-03
2017-07-16
2017-07-18
2017-07-26
2017-07-25 11UHA
2017-06-28
2017-06-29
2017-07-18
2017-07-18
2017-07-28
2017-07-25 40UBA
2017-07-18
2017-07-18
2017-07-19
2017-07-19
2017-07-24
2017-07-25 00; 00EKH; 12MB
2017-07-19
2017-07-19
2017-07-20
2017-07-20
2017-07-25
2017-07-25 12MBR
2017-06-06
2017-06-05
2017-07-18
2017-07-19
2017-07-28
2017-07-26 30PAC
2017-06-28
2017-06-29
2017-07-18
2017-07-18
2017-07-28
2017-07-26 30LAC
2017-06-28
2017-06-29
2017-07-18
2017-07-18
2017-07-28
2017-07-26 30PSB; 40PSB
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
B 1.
Intern Siemens
Correspondence status
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Correspondences from OC to Owner Last updated on :
9‐Aug‐17
Last updated by : Basel Wasif Nermine Jean Sn
Letter No.
Date
Letter Title
Category
Reply Required
Target Date
Action By
Status
Reply letter / letters by EEHC 2015_22‐EEHC_SAG‐OH‐L‐00007
1
2015 ‐22‐OC‐EEHC‐L00001
5/Jul/15
Orascom Construction Industries authorized signatory
Commercial
NO
Closed
2
2015 ‐22‐OC‐EEHC‐L00002
21/Jul/15
Topographic Survey Drawings
CIVIL
NO
Closed
3
2015 ‐22‐OC‐EEHC‐L00003
24/Aug/15
EPC Contract 1st Advance Payment LG
Commercial
NO
Closed
4
2015 ‐22‐OC‐EEHC‐L00004
24/Aug/15
EPC Contract 1st Advance Payment
Commercial
NO
Closed
5
2015 ‐22‐OC‐EEHC‐L00005
31/Aug/15
EPC Contract 2nd Advance Payment LG
Commercial
NO
Closed
6
2015 ‐22‐OC‐EEHC‐L00006
2/Sep/15
EPC Contract 2nd Advance Payment
Commercial
NO
Closed
7
2015_22‐OC‐EEHC‐L‐00007
15/Sep/15
Site Finish Levels
Civil
NO
Closed
8
2015_22‐OC‐EEHC‐L‐00008
22/Sep/15
Temporary Switch Gear Building RE 2015_22‐EEHC_SAG‐OH‐L‐00006 Temporary Construction Power
Commercial
YES
Electrical
NO
Closed
9
2015_22‐OC‐EEHC‐L‐00009
22/Sep/15
ASAP
FWD to PGESCo
payment by 08/09
Closed
10
2015_22‐OC‐EEHC‐L‐00010
28/Sep/15
RE : 2015_22‐EEHC_SAG‐OH‐L‐00003 GIS Skeleton
Commercial / C
NO
Closed
11
2015_22‐OC‐EEHC‐L‐00011
29/Sep/15
RE : 2015_22‐EEHC_SAG‐OH‐L‐00005 Technical Data for Discharge and Intake Pipes
Commercial / Mechnical
NO
Closed
12
2015_22‐OC‐EEHC‐L‐00012
3/Oct/15
Administration Building design modification
Civil
NO
Closed
13
2015_22‐OC‐EEHC‐L‐00013
7/Oct/15
QC Monthly Report
General
NO
Closed
14
2015_22‐OC‐EEHC‐L‐00014
15/Oct/15
Re 2015_22‐EEHC_SAG‐OH‐L‐00021 Administration Building
Civil
NO
Closed
15
2015_22‐OC‐EEHC‐L‐00015
15/Oct/15
Re 2015_22‐EEHC_SAG‐OH‐L‐00016 GIS Building Skeleton
Civil
NO
Closed
16
2015_22‐OC‐EEHC‐L‐00016
15/Oct/15
Re 2015_22‐EEHC_SAG‐OH‐L‐00019 GIS Piles Boring
General
NO
Closed
17
2015_22‐OC‐EEHC‐L‐00019
22/Oct/15
Daily Report
General
NO
Closed
18
2015_22‐OC‐EEHC‐L‐00018
25/Oct/15
NO
Closed
19
2015_22‐OC‐EEHC‐L‐00017
25/Oct/15
NO
Closed
20
2015_22‐OC‐EEHC‐L‐00020
21
29/Oct/15
Re 2015_22‐EEHC_SAG‐OH‐L‐00024 Re Ultra‐Sonic Test for Civil Piles Re 2015_22‐EEHC_SAG‐OH‐L‐00025 Re Hold of Camp General Works Nomination of Additional Supplier cladding Commercial
YES
3/Nov/15 Owner
Closed
2015_22‐OC‐EEHC‐L‐00021
29/Oct/15
Over Head Lines
General
YES
3/Nov/15 Owner
Closed
22
2015_22‐OC‐EEHC‐L‐00022
1/Nov/15
Daily Report
General
NO
Closed
23
2015_22‐OC‐EEHC‐L‐00023
4/Nov/15
RE 2015_22‐EEHC_SAG‐OH‐L‐00032 MV Cables Routes
General
NO
Closed
24
2015_22‐OC‐EEHC‐L‐00024
5/Nov/15
QC Monthly Report
General
NO
Closed
25
2015_22‐OC‐EEHC‐L‐00025
5/Nov/15
NO
Closed
26
2015_22‐OC‐EEHC‐L‐00026
6/Nov/15
NO
Closed
RE 2015_22‐EEHC_SAG‐OH‐L‐00030 Nomination of Commercial additional cladding supplier RE 2015_22‐EEHC_SAG‐OH‐L‐00031 Civil Work problems on Civil Site
Comments
2015_22‐EEHC_SAG‐OH‐L‐00021
27
2015_22‐OC‐EEHC‐L‐00028
8/Nov/15
Daily Report
General
NO
Closed
28
2015_22‐OC‐EEHC‐L‐00027
10/Nov/15
Color of Cladding, Flashing, Doors & Windows.
Civil
NO
Closed
29
2015_22‐OC‐EEHC‐L‐00029
11/Nov/15
RE 2015_22‐EEHC_SAG‐OH‐L‐00032 MV Cables Routes
Civil
NO
Closed
30
2015_22‐OC‐EEHC‐L‐00030
12/Nov/15
Nomination of Additional Supplier‐Steel Structure
Civil
YES
31
2015_22‐OC‐EEHC‐L‐00031
12/Nov/15
Nomination of additional Steel reinforcement supplier
Civil
NO
Closed
32
2015_22‐OC‐EEHC‐L‐00032
12/Nov/15
Re 2015_22‐EEHC_SAG‐OH‐L‐00033 GIS Building Drawings
Civil
NO
Closed
33
2015_22‐OC‐EEHC‐L‐00033
12/Nov/15
Civil
NO
Closed
34
2015_22‐OC‐EEHC‐L‐00034
12/Nov/15
Civil
NO
Closed
35
2015_22‐OC‐EEHC‐L‐00035
14/Nov/15
Daily Report
General
NO
Closed
36
2015_22‐OC‐EEHC‐L‐00036
21/Nov/15
Daily Report
General
NO
Closed
37
2015_22‐OC‐EEHC‐L‐00037
29/Nov/15
Daily Report
General
NO
Closed
38
2015_22‐OC‐EEHC‐L‐00038
2/Dec/15
Nomination of additional Cables supplier
Commercial
Yes
39
2015_22‐OC‐EEHC‐L‐00039
2/Nov/15
Re: 2015_22‐EEHC_SAG‐OC‐L‐00040 Temporary RO
Civil
NO
40
2015_22‐OC‐EEHC‐L‐00040
3/Dec/15
Contractor RO plant‐ rejected water line
General
Yes
41
2015_22‐OC‐EEHC‐L‐00041
2/Dec/15
Invoice no. 2 (Site Preparation)
Commercial
NO
42
2015_22‐OC‐EEHC‐L‐00042
3/Dec/15
Nomination of additional Cables suppliers
Commercial
Yes
8/Dec/15 Owner
Closed
2015_22‐EEHC_SAG‐OC‐L‐00043
43
2015_22‐OC‐EEHC‐L‐00043
3/Dec/15
Nomination of additional Cable trays supplier
Commercial
Yes
8/Dec/15 Owner
Closed
2015_22‐EEHC_SAG‐OC‐L‐00044
44
2015_22‐OC‐EEHC‐L‐00044
7/Dec/15
Daily Report
General
NO
Closed
45
2015_22‐OC‐EEHC‐L‐00045
7/Dec/15
November QC Report
General
NO
Closed
46
2015_22‐OC‐EEHC‐L‐00046
10/Dec/15
Administration and Warehouse Buildings
Civil
Yes
15/Dec/15 Owner
Closed
Civil
Yes
15/Dec/15 Owner
Closed
Civil
NO
Re 2015_22‐EEHC_SAG‐OH‐L‐00027 Intake and discharge pipe lines Re 2015_22‐EEHC_SAG‐OH‐L‐00034 Intake and discharge pipe lines
Re 2015_22‐EEHC_SAG‐OC‐L‐00044 Nomination of additional Cable Trays supplier Re: 2015_22‐EEHC_SAG‐OC‐L‐00035 & 00046 Broken dewels
17/Nov/15 Owner
7/Dec/15 Owner
10/Dec/15 Owner
Closed
Closed
2015_22‐EEHC_SAG‐OC‐L‐00043
Closed
2015_22‐EEHC_SAG‐OC‐L‐00051
Closed
2015_22‐EEHC_SAG‐OC‐L‐00048
Closed
47
2015_22‐OC‐EEHC‐L‐00047
10/Dec/15
48
2015_22‐OC‐EEHC‐L‐00049
10/Dec/15
49
2015_22‐OC‐EEHC‐L‐00051
13/Dec/15
Nomination of additional Cables supplier
Commercial
Yes
50
2015_22‐OC‐EEHC‐L‐00053
13/Dec/15
Daily Report
General
NO
Closed
51
2015_22‐OC‐EEHC‐L‐00052
14/Dec/15
Owner Caravan Furniture
Commercial
NO
Closed
52
2015_22‐OC‐EEHC‐L‐00054
17/Dec/15
Dispersal model and Ecological study
General
NO
Closed
53
2015_22‐OC‐EEHC‐L‐00056
17/Dec/15
Rejected Water line Approval
General
NO
Closed
54
2015_22‐OC‐EEHC‐L‐00050
17/Dec/15
Re 2015_22‐EEHC_SAG‐OC‐L‐00051 Temporary R.O Plant
civil
NO
Closed
2015_22‐EEHC_SAG‐OC‐L‐00053
Closed 18/Dec/15 Owner
Closed
2015_22‐EEHC_SAG‐OC‐L‐00053
55
2015_22‐OC‐EEHC‐L‐00055
20/Dec/15
Daily Report from 12 to 18 December 2015.
General
NO
Closed
56
2015_22‐OC‐EEHC‐L‐00057
21/Dec/15
Intake, Discharge and Cooling water lines
Mechanical
NO
Closed
57
2015_22‐OC‐EEHC‐L‐00058
24/Dec/15
Re 2015‐22‐EEHC_SAG‐OC‐L‐00057 Recommended Spare Parts List for BoP
Mechanical
NO
Closed
58
2015_22‐OC‐EEHC‐L‐00048
27/Dec/15
Invoice no. 3 (Site Preparation)
Commercial
NO
Closed
59
2015_22‐OC‐EEHC‐L‐00059
27/Dec/15
Daily Report
General
NO
Closed
60
2015_22‐OC‐EEHC‐L‐00060
27/Dec/15
Nomination of Additional LV Cables Supplier
Commercial
YEs
61
2015_22‐OC‐EEHC‐L‐00061
31/Dec/15
Civil
NO
Closed
62
2015_22‐OC‐EEHC‐L‐00062
31/Dec/15
Closed
2015_22‐EEHC_SAG‐OC‐L‐00067
63
2015_22‐OC‐EEHC‐L‐00063
1/Jan/16
64
2015_22‐OC‐EEHC‐L‐00064
1/Jan/16
65
2015_22‐OC‐EEHC‐L‐00065
4/Jan/16
66
2015_22‐OC‐EEHC‐L‐00066
5/Jan/16
67
2015_22‐OC‐EEHC‐L‐00069
6/Jan/16
68
2015_22‐OC‐EEHC‐L‐00067
10/Jan/16
69
2015_22‐OC‐EEHC‐L‐00068
10/Jan/16
70
2015_22‐OC‐EEHC‐L‐00070
10/Jan/16
71
2015_22‐OC‐EEHC‐L‐00071
10/Jan/16
72
2015_22‐OC‐EEHC‐L‐00072
11/Jan/16
73
2015_22‐OC‐EEHC‐L‐00073
10/Jan/16
74
2015_22‐OC‐EEHC‐L‐00074
10/Jan/16
75
2015_22‐OC‐EEHC‐L‐00075
16/Jan/16
76
2015_22‐OC‐EEHC‐L‐00076
77
7/Jan/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00060
2015_22‐EEHC_SAG‐OC‐L‐00065
Re 2015‐22‐EEHC_SAG‐OC‐L‐00053 Temporary and Permanent Fences Re 2015‐22‐EEHC_SAG‐OC‐L‐00061 , 00063 & 00064 Backfilling of Gas Reducing Station Nomination of Underground Fire Fighting Accessories Suppliers Nomination of HDPE Underground Fire Pipes FM200 Suppliers Re 2015‐22‐EEHC_SAG‐OC‐L‐00067 Backfilling of Gas Reducing Station
Civil
NO
Commercial
YEs
5/Jan/16 Owner
Closed
2015_22‐EEHC_SAG‐OC‐L‐00066
Commercial
YEs
5/Jan/16 Owner
Closed
2015_22‐EEHC_SAG‐OC‐L‐00066
Civil
NO
Closed
Daily Report
General
NO
Closed
NO
Closed
NO
Closed
NO
Closed
Re 2015‐22‐EEHC_SAG‐OC‐L‐00068 Works Required for Gas General Reducing Station Re 2015‐22‐EEHC_SAG‐OC‐L‐00070 Pile Tests for Central Civil Control Building December 2015‐QC Report
General
Re 2015‐22‐EEHC_SAG‐OC‐L‐00066 Nomination of Commercial Underground Fire Fighting Re 2015‐22‐EEHC_SAG‐OC‐L‐00069 Re Meeting about Gas Civil Reducing Station Daily report
General
YEs
15/Jan/16 Owner
Closed
NO
Closed
NO
Closed
Re Re 2015‐22‐EEHC_SAG‐OC‐L‐00043 Nomination of Commercial additional Cables supplier Re 2015‐22‐EEHC_SAG‐OC‐L‐00072 Re Nomination of Commercial Underground Fire Fighting Re 2015‐22‐EEHC_SAG‐OC‐L‐00075 Re Water Table Level of Civil the Gas Reducing Station
YEs
17/Jan/16 Owner
Closed
YEs
17/Jan/16 Owner
Closed
NO
Closed
17/Jan/16
Project's Cermainc tiles types and codes
Civil
NO
Closed
2015_22‐OC‐EEHC‐L‐00077
17/Jan/16
Nomination of GIS HVAC Suppliers
Commercial
YEs
78
2015_22‐OC‐EEHC‐L‐00079
21/Jan/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00074 & 00077 Pile Coordinates for Gas Reducing Station
Civil
NO
Closed
79
2015_22‐OC‐EEHC‐L‐00080
21/Jan/16
International Costal Road infront of Site
General
NO
Closed
80
2015_22‐OC‐EEHC‐L‐00087
21/Jan/16
Invoice no. 4 (Site Preparation)
Commercial
NO
Closed
81
2015_22‐OC‐EEHC‐L‐00081
24/Jan/16
Proposal of Fire Fighting Station building
Civil
NO
Closed
82
2015_22‐OC‐EEHC‐L‐00078
25/Jan/16
Daily report
Civil
NO
Closed
23/Jan/16 Owner
2015_22‐EEHC_SAG‐OC‐L‐00069
2015_22‐EEHC_SAG‐OC‐L‐00072
Closed 2015_22‐EEHC_SAG‐OC‐L‐00081
2015_22‐EEHC_SAG‐OC‐L‐00085
83
2015_22‐OC‐EEHC‐L‐00082
31/Jan/16
Daily report
Civil
NO
Closed
84
2015_22‐OC‐EEHC‐L‐00084
2/Feb/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00086 Additional Supplier Nomination for GIS HVAC
Civil
NO
Closed
85
2015_22‐OC‐EEHC‐L‐00085
6/Feb/16
January 2016 ‐QC Report.
General
NO
Closed
86
2015_22‐OC‐EEHC‐L‐00086
7/Feb/16
Daily Reports from 30 January to 05 February 2016.
General
NO
Closed
87
2015_22‐OC‐EEHC‐L‐00088
11/Feb/16
Nomination of additional I&C Cables Supplier.
Commercial
YES
16/Feb/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00099
88
2015_22‐OC‐EEHC‐L‐00089
11/Feb/16
Nomination of additional Low voltage Cables Supplier.
Commercial
YES
16/Feb/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00098
89
2015_22‐OC‐EEHC‐L‐00090
11/Feb/16
Civil
NO
Closed
90
2015_22‐OC‐EEHC‐L‐00091
11/Feb/16
Civil
NO
Closed
91
2015_22‐OC‐EEHC‐L‐00092
16/Feb/16
General
NO
Closed
92
2015_22‐OC‐EEHC‐L‐00095
18/Feb/16
General
YES
93
2015_22‐OC‐EEHC‐L‐00094
21/Feb/16
Commercial
NO
Closed
94
2015_22‐OC‐EEHC‐L‐00096
22/Feb/16
Daily Reports from 13 to 19 February 2016.
General
NO
Closed
95
2015_22‐OC‐EEHC‐L‐00083
22/Feb/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00096 ‐Re Raised Flooring Specimen.
Civil
NO
Closed
2015_22‐EEHC_SAG‐OC‐L‐00105
96
2015_22‐OC‐EEHC‐L‐00098
25/Feb/16
Nomination of Additional Fire‐fighting Pipes Suppliers.
Commercial
YES
Closed
2015_22‐EEHC_SAG‐OC‐L‐00111
97
2015_22‐OC‐EEHC‐L‐00099
25/Feb/16
Civil
NO
Closed
2015_22‐EEHC_SAG‐OC‐L‐00112
98
2015_22‐OC‐EEHC‐L‐00097
25/Feb/16
Commercial
NO
Closed
2015_22‐EEHC_SAG‐OC‐L‐00116
99
2015_22‐OC‐EEHC‐L‐00100
29/Feb/16
Power Supply of Water Treatment.
Electrical
NO
Closed
2015_22‐EEHC_SAG‐OC‐L‐00115
100 2015_22‐OC‐EEHC‐L‐00101
29/Feb/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00099 ‐Re Nomination of Additional ICC Cables Supplier.
Commercial
YES
Closed
2015_22‐EEHC_SAG‐OC‐L‐00110
101 2015_22‐OC‐EEHC‐L‐00102
29/Feb/16
Daily Reports from 20 to 26 February 2016.
General
NO
102 2015_22‐OC‐EEHC‐L‐00104
1/Mar/16
Commercial
YES
103 2015_22‐OC‐EEHC‐L‐00093
1/Mar/16
Civil
104 2015_22‐OC‐EEHC‐L‐00105
6/Mar/16
105 2015_22‐OC‐EEHC‐L‐00107
8/Mar/16
106 2015_22‐OC‐EEHC‐L‐00108
8/Mar/16
107 2015_22‐OC‐EEHC‐L‐00109
13/Mar/16
108 2015_22‐OC‐EEHC‐L‐00103
Re 2015_22‐EEHC_SAG‐OC‐L‐00087 ‐ Re Raised Flooring Specimen. Re 2015_22‐EEHC_SAG‐OC‐L‐00085 ‐Re Proposal for Fire Fighting Station Building. Daily Reports from 06 to 12 February 2016. Re 2015_22‐EEHC_SAG‐OC‐L‐00092 ‐Re Coordinates of Laydown Area. OC Scope share advance payment letters of Guarantee Extension .
Re 2015_22‐EEHC_SAG‐OC‐L‐00100 ‐Re Piping Route of Temporary R.O. Re 2015_22‐EEHC_SAG‐OC‐L‐00104 ‐Re Provision of IT Facilities.
21/Feb/16
1/Mar/16
4/Mar/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00097
2015_22‐EEHC_SAG‐OC‐L‐00102
Closed Closed
2015_22‐EEHC_SAG‐OC‐L‐00113 2015_22‐EEHC_SAG‐OC‐L‐00120
YES
Closed
2015_22‐EEHC_SAG‐OC‐L‐00119
General
NO
Closed
Mechanical
NO
Closed
Civil
NO
Closed
Daily Reports from 05 to 11 March 2016.
General
NO
Closed
13/Mar/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00110 ‐ Re Nomination of additional I&C Cables Supplier.
Commercial
YES
109 2015_22‐OC‐EEHC‐L‐00110
13/Mar/16
2015_22‐EEHC_SAG‐L‐00045 ‐ Demin Water System.
Mechanical
NO
Closed
110 2015_22‐OC‐EEHC‐L‐00111
15/Mar/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00089 ‐ Re Approval of Egyptian Shore Protection Authority.
General
NO
Closed
Nomination of Additional Standard Carbon Steel and St. Steel Pipes Suppliers. Re 2015_22‐EEHC_SAG‐OC‐L‐00107 ‐Re Site Protection Measures against Seawater Inundation. Daily Reports from 27 February to 04 March 2016. Re 2015_22‐EEHC_SAG‐T‐00022 ‐ Service Cooling Water Pumps. Re 2015_22‐EEHC_SAG‐OC‐L‐00047 ‐Re Tests on Working Piles for GIS Building.
6/Mar/16
18/Mar/16
Closed 2015_22‐EEHC_SAG‐OC‐L‐00125
Re 2015_22‐EEHC_SAG‐OC‐L‐00118 & 00088 ‐ Re Western General Construction Road Nomination of additional Fire‐Fighting System Supplier ‐ Commercial ETEA SICUREZZA S.r.l.” – Italy. Re 2015_22‐EEHC_SAG‐OC‐L‐00117 ‐ Re Border Guards' General Approval Re 2015_22‐EEHC_SAG‐OC‐L‐00112 ‐Re Coordinates and General Depth of Temporary R.O. Pipes Re 2015_22‐EEHC_SAG‐OC‐L‐00113 ‐Re Nomination of Commercial Additional Standard Carbon steel and St. Steel Pipes Nomination of additional HDPE underground Pipes Supplier ‐ Commercial Agru” – Germany
NO
111 2015_22‐OC‐EEHC‐L‐00112
15/Mar/16
112 2015_22‐OC‐EEHC‐L‐00113
15/Mar/16
113 2015_22‐OC‐EEHC‐L‐00114
15/Mar/16
114 2015_22‐OC‐EEHC‐L‐00106
15/Mar/16
115 2015_22‐OC‐EEHC‐L‐00115
16/Mar/16
116 2015_22‐OC‐EEHC‐L‐00116
17/Mar/16
117 2015_22‐OC‐EEHC‐L‐00117
24/Mar/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00125 ‐Demin Water System. Mechanical
NO
118 2015_22‐OC‐EEHC‐L‐00119
29/Mar/16
Nomination of additional HDPE underground Pipes ‐ 1. “Plastek” – Italy
Commercial
YES
119 2015_22‐OC‐EEHC‐L‐00120
29/Mar/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00120 ‐Re Nomination of additional Standard Carbon steel and St. steel suppliers.
Commercial
120 2015_22‐OC‐EEHC‐L‐00121
29/Mar/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00124 ‐Re Nomination of additional Fire‐Fighting System Supplier.
121 2015_22‐OC‐EEHC‐L‐00118
30/Mar/16
Daily Reports from 12 to 25 March 2016.
122 2015_22‐OC‐EEHC‐L‐00122
30/Mar/16
123 2015_22‐OC‐EEHC‐L‐00123
30/Mar/16
124 2015_22‐OC‐EEHC‐L‐00124
2/Apr/16
125 2015_22‐OC‐EEHC‐L‐00125
2/Apr/16
126 2015_22‐OC‐EEHC‐L‐00126
2/Apr/16
127 2015_22‐OC‐EEHC‐L‐00127
5/Apr/16
128 2015_22‐OC‐EEHC‐L‐00128
5/Apr/16
129 2015_22‐OC‐EEHC‐L‐00129
7/Apr/16
130 2015_22‐OC‐EEHC‐L‐00130
12/Apr/16
131 2015_22‐OC‐EEHC‐L‐00132
13/Apr/16
132 2015_22‐OC‐EEHC‐L‐00133
14/Apr/16
133 2015_22‐OC‐EEHC‐L‐00131
14/Apr/16
134 2015_22‐OC‐EEHC‐L‐00134
14/Apr/16
135 2015_22‐OC‐EEHC‐L‐00135
14/Apr/16
Re Gas Reducing Station Works Handover.
136 2015_22‐OC‐EEHC‐L‐00137
18/Apr/16
YES
Closed 20/Mar/16
Closed
NO
Closed
NO
Closed
2015_22‐EEHC_SAG‐OC‐L‐00124
Yes
18/Mar/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00120
Yes
22/Mar/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00126
Closed
2015_22‐EEHC_SAG‐OC‐L‐00127
3/Apr/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00133
YES
3/Apr/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00135
Commercial
YES
3/Apr/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00132
General
NO
Commercial
YES
4/Apr/16
Closed
Commercial
YES
4/Apr/16
Closed
Commercial
NO
Closed
Commercial
NO
Closed
Commercial
YES
Closed
Commercial
YES
Commercial
YES
Commercial
YES
General
NO
Commercial
YES
Commercial
NO
Commercial
Yes
Electrical
NO
Closed
Commercial
NO
Closed
Nomination of Additional Steel Structure Supplier ‐ Swegypt Commercial Mina.
Yes
Nomination of additional HDPE underground Pipes ‐ 1. “Eurotubi. Srl” – Italy; Nomination of additional LV Cables Supplier ‐ Helukabel” – Germany. Re 2015_22‐EEHC_SAG‐OC‐L‐00128 ‐Re Termination of Works in Gas Reducing Station. Re 2015_22‐EEHC_SAG‐OC‐L‐00130 ‐Re Decennial Liability Insurance Certificate Re 2015_22‐EEHC_SAG‐OC‐L‐00123 ‐Re Unapproved Suppliers. Re Nomination of additional HDPE underground Pipes suppliers. Re 2015_22‐EEHC_SAG‐OC‐L‐00121 & 105 ‐Re Raised Flooring Guarantee. Re 2015_22‐EEHC_SAG‐OC‐L‐00060 ‐ RE Cooling Water Pipelines ‐ Nomination of additional Underground HDPE Pipes suppliers. Daily Reports from 26 March to 8 April 2016. Re 2015_22‐EEHC_SAG‐OC‐L‐00135 ‐ RE Nomination of Additional Standard Carbon Steel and St. Steel suppliers. Re 2015_22‐EEHC_SAG‐OC‐L‐00139 ‐Re Unapproved Suppliers. Nomination of Additional Steel Plates Supplier ‐ 1. “NLMK VERONA S.p.A.” – Italy. Re 2015_22‐EEHC_SAG‐OC‐L‐00115 ‐Re Power Supply of Water Treatment.
Closed
10/Apr/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00134
2015_22‐EEHC_SAG‐OC‐L‐00138
OPEN 12/Apr/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00140
Closed 17/Apr/16
19/Apr/16
23/Apr/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00141
Closed
2015_22‐EEHC_SAG‐OC‐L‐00149
Closed
2015_22‐EEHC_SAG‐OC‐L‐00144
OPEN
137 2015_22‐OC‐EEHC‐L‐00138
19/Apr/16
Daily Reports from 08 April to 15 April 2016.
138 2015_22‐OC‐EEHC‐L‐00139
19/Apr/16
139 2015_22‐OC‐EEHC‐L‐00140
20/Apr/16
140 2015_22‐OC‐EEHC‐L‐00136
22/Apr/16
141 2015_22‐OC‐EEHC‐L‐00141
23/Apr/16
142 2015_22‐OC‐EEHC‐L‐00142
22/Apr/16
143 2015_22‐OC‐EEHC‐L‐00143
26/Apr/16
144 2015_22‐OC‐EEHC‐L‐00144
27/Apr/16
145 2015_22‐OC‐EEHC‐L‐00145
28/Apr/16
146 2015_22‐OC‐EEHC‐L‐00146
3/May/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00146 ‐Re Nomination of Additional Standard Carbon Steel & St. Steel Suppliers.
147 2015_22‐OC‐EEHC‐L‐00147
3/May/16
148 2015_22‐OC‐EEHC‐L‐00148
General
Nomination of additional Carbon steel and Stainless Steel Commercial Pipes, Valve and Fittings Supplier ‐ CUNADO GROUP” – Nomination of Additional Carbon Steel and Stainless Steel Commercial Pipes and Fittings Supplier ‐ “Kimetal” – Italy. Re 2015_22‐EEHC_SAG‐OC‐L‐00116 ‐IT Facilities to Owner. Commercial Nomination of additional steel pipes and valves Supplier ‐ 1. Commercial “ARCELOR.Mittal” – Italy; Nomination of Additional Electromechanical Installation Commercial Subcontractors ‐ 1. “IREM S.P.A” – Italy. Daily Reports from 16 April to 22 April 2016.
General
Re 2015_22‐EEHC_SAG‐OC‐L‐00143 ‐Re Obstruction of Civil Construction Power Completion. Nomination of additional RCCP pipes Supplier ‐ 1. “( Commercial ECPC)” – Egypt;
NO
Closed
Yes
24/Apr/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00146
Yes
25/Apr/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00146
NO
Closed
Yes
28/Apr/16
Closed
Yes
27/Apr/16
Closed
NO
Closed
NO
Closed
2015_22‐EEHC_SAG‐OC‐L‐00148
Yes
2/May/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00151
Commercial
Yes
8/May/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00153
Re 2015_22‐EEHC_SAG‐OC‐L‐00144 ‐Re Nomination of additional Steel Structure Supplier.
Commercial
Yes
8/May/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00154
3/May/16
Orascom Construction Scope ‐ Invoice No.1.
Commercial
NO
Closed
149 2015_22‐OC‐EEHC‐L‐00149
3/May/16
Site Preparation Agreement ‐ Invoice No.5.
Commercial
NO
Closed
150 2015_22‐OC‐EEHC‐L‐00151
4/May/16
Owner’s RO ‐ Pipeline for reject water.
Civil
Yes
151 2015_22‐OC‐EEHC‐L‐00152
9/May/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00127 ‐Re Demin Water System.
Mechanical
NO
Closed
152 2015_22‐OC‐EEHC‐L‐00153
5/May/16
Daily Reports from 23 April to 29 April 2016.
General
NO
Closed
153 2015_22‐OC‐EEHC‐L‐00154
9/May/16
Gas Pipeline ‐ As‐built drawings.
Civil
Yes
154 2015_22‐OC‐EEHC‐L‐00155
10/May/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00147 ‐Re Discrepancy of Piles Between Units
Civil
NO
155 2015_22‐OC‐EEHC‐L‐00150
10/May/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00141 ‐RE Nomination of additional standard Carbon Steel and St. Steel Supplier.
Commercial
Yes
14/May/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00156
156 2015_22‐OC‐EEHC‐L‐00156
11/May/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00153 ‐ Re Nomination of Additional standard Carbon Steel and St. Steel Supplier.
Commercial
Yes
16/May/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00157
157 2015_22‐OC‐EEHC‐L‐00157
12/May/16
Commercial
Yes
16/May/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00158
158 2015_22‐OC‐EEHC‐L‐00158
12/May/16
Mechanical
NO
Closed
159 2015_22‐OC‐EEHC‐L‐00159
12/May/16
NO
Closed
160 2015_22‐OC‐EEHC‐L‐00160
17/May/16
161 2015_22‐OC‐EEHC‐L‐00161
18/May/16
Nomination of Additional Sump Pumps Suppliers ‐ 1. “FAGGIOLATI” – Italy. Re 2015_22‐EEHC_SAG‐OC‐L‐00140 ‐ Re Cooling Water Pipelines‐Nomination of Additional HDPE. Daily Reports from 30 April to 06 May 2016.
Nomination of additional Air Conditioning Supplier ‐ Weger Commercial Walter Gmbh” – Italy. Intake Heads Boreholes. Civil
7/May/16
13/May/16
Closed
Closed Closed
YES
22/May/16
Closed
YES
20/May/16
Closed
162 2015_22‐OC‐EEHC‐L‐00162
18/May/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00157 ‐RE Nomination of additional carbon steel and st. steel pipes, valves and fittings supplier 3.
Commercial
YES
163 2015_22‐OC‐EEHC‐L‐00163
19/May/16
Site Preparation Agreement ‐ Invoice No.6.
Commercial
NO
Closed
164 2015_22‐OC‐EEHC‐L‐00164
19/May/16
Daily Reports from 07 May to 13 May 2016.
General
NO
Closed
165 2015_22‐OC‐EEHC‐L‐00165
21/May/16
Nomination of Additional Piping Suppliers.
Commercial
YES
26/May/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00165
166 2015_22‐OC‐EEHC‐L‐00166
23/May/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00161 ‐RE Nomination of Additional Carbon Steel and St.Steel Pipes, Valves & Fiitings Commercial Supplier 4.
YES
28/May/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00166
167 2015_22‐OC‐EEHC‐L‐00167
23/May/16
Notice for factory Inspection Test.
Commercial
YES
Closed
2015_22‐EEHC_SAG‐OC‐L‐00164
168 2015_22‐OC‐EEHC‐L‐00169
24/May/16
Commercial
YES
29/May/16
Closed
169 2015_22‐OC‐EEHC‐L‐00170
24/May/16
Commercial
YES
29/May/16
Closed
170 2015_22‐OC‐EEHC‐L‐00168
25/May/16
General
YES
28/May/16
Closed
171 2015_22‐OC‐EEHC‐L‐00171
26/May/16
Commercial
YES
Closed
172 2015_22‐OC‐EEHC‐L‐00172
26/May/16
Commercial
YES
Closed
Arabic Letter Dated 5 Jun, 2016
173 2015_22‐OC‐EEHC‐L‐00173
26/May/16
Commercial
YES
31/May/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00170
174 2015_22‐OC‐EEHC‐L‐00174
27/May/16
YES
30/May/16
Closed
175 2015_22‐OC‐EEHC‐L‐00175
29/May/16
YES
4/Jun/16
Closed
176 2015_22‐OC‐EEHC‐L‐00176
30/May/16
177 2015_22‐OC‐EEHC‐L‐00177
1/Jun/16
178 2015_22‐OC‐EEHC‐L‐00178
Nomination of Additional Air Conditioning Component' Supplier "Saiver ‐ Italy" Re 2015_22‐EEHC_SAG‐OC‐L‐00153 ‐Re Nomination of Additional Carbon Steel and St. Steel Pipes, Valves & Fittings Supplier. Contractor's Taken Material on Site The Reduction of the Advance Payment Letters of Guarantee. Site Preparation Agreement Advance Payment letters of Guarantee return. Nomination of Additional Piping Supplier ‐ Sarplast – Italy.
Re 2015_22‐EEHC_SAG‐OC‐L‐00162 ‐Re Alternatives Civil Structure for Air Defense Forces. Nomination of Additional Piping Supplier ‐ 1. Sider Piping – Commercial Italy
23/May/16
2015_22‐EEHC_SAG‐OC‐L‐00161
2015_22‐EEHC_SAG‐OC‐L‐00168
2015_22‐EEHC_SAG‐OC‐L‐00174
YES
2/Jun/16
Daily Reports from 14 May to 20 May 2016. General Nomination of Additional Piping Supplier ‐ 1. Marly Pumps – Commercial Italy Orascom Construction Scope ‐ Invoice No.2. Commercial
NO
Closed
179 2015_22‐OC‐EEHC‐L‐00179
2/Jun/16
Daily Reports from 21 May to 27 May 2016.
General
NO
Closed
180 2015_22‐OC‐EEHC‐L‐00180
6/Jun/16
The Reduction of the Advance Payment Letters of Guarantee.
Commercial
YES
Closed
181 2015_22‐OC‐EEHC‐L‐00184
6/Jun/16
Nomination of Additional Valves Supplier.
Commercial
YES
11/Jun/16
Closed
182 2015_22‐OC‐EEHC‐L‐00185
6/Jun/16
Commercial
YES
11/Jun/16
Closed
183 2015_22‐OC‐EEHC‐L‐00186
7/Jun/16
Commercial
YES
11/Jun/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00179
184 2015_22‐OC‐EEHC‐L‐00187
7/Jun/16
Commercial
YES
11/Jun/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00180
185 2015_22‐OC‐EEHC‐L‐00188
7/Jun/16
Commercial
YES
Closed
2015_22‐EEHC_OC‐L‐00001
Nomination of Additional Large HDPE Pipes Supplier ‐ Pipelife Norge AS. Re 2015_22‐EEHC_SAG‐OC‐L‐00174 ‐ Nomination of Additional Piping Supplier. Re 2015_22‐EEHC_SAG‐OC‐L‐00158 ‐Nomination of Additional Sump Pumps Supplier. Re 2015_22‐EEHC_SAG‐OC‐L‐00166 ‐Nomination of Additional Carbon Steel and st. steel pipes, Valve and Fittings Supplier.
NO
Closed
Closed 4/Jun/16
Closed
2015_22‐EEHC_SAG‐OC‐L‐00175
2015_22‐EEHC_SAG‐OC‐L‐00178
approved Cunado
186 2015_22‐OC‐EEHC‐L‐00181
9/Jun/16
Auxiliary system P & lDs for GHG, GM and QFB.
Mechanical
YES
Closed
187 2015_22‐OC‐EEHC‐L‐00190
9/Jun/16
Daily Reports from 28 May to 03 June 2016.
General
NO
Closed
188 2015_22‐OC‐EEHC‐L‐00183
12/Jun/16
Nomination of Additional Steel Structure supply and Fabrication supplier ‐ Duferdofin Nucor srl – Italy.
Commercial
YES
189 2015_22‐OC‐EEHC‐L‐00189
12/Jun/16
Site Prepration Agreement ‐ Invoice No.7
Commercial
NO
Closed
190 2015_22‐OC‐EEHC‐L‐00191
13/Jun/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00167 ‐ Re Packing Lists No. Commercial 084 & 094.
YES
Closed
191 2015_22‐OC‐EEHC‐L‐00196
13/Jun/16
Nomination of Additional Pumps Supplier ‐ Garbarino – Italy.
Commercial
YES
192 2015_22‐OC‐EEHC‐L‐00192
21/Jun/16
Site Prepration Agreement ‐ Invoice No.8
Commercial
NO
193 2015_22‐OC‐EEHC‐L‐00193
23/Jun/16
194 2015_22‐OC‐EEHC‐L‐00194
27/Jun/16
195 2015_22‐OC‐EEHC‐L‐00195
27/Jun/16
196 2015_22‐OC‐EEHC‐L‐00197
27/Jun/16
197 2015_22‐OC‐EEHC‐L‐00198
27/Jun/16
198 2015_22‐OC‐EEHC‐L‐00199
27/Jun/16
199 2015_22‐OC‐EEHC‐L‐00200
27/Jun/16
200 2015_22‐OC‐EEHC‐L‐00201
28/Jun/16
201 2015_22‐OC‐EEHC‐L‐00202
28/Jun/16
202 2015_22‐OC‐EEHC‐L‐00203
28/Jun/16
203 2015_22‐OC‐EEHC‐L‐00204
28/Jun/16
204 2015_22‐OC‐EEHC‐L‐00205
3/Jul/16
205 2015_22‐OC‐EEHC‐L‐00206
3/Jul/16
206 2015_22‐OC‐EEHC‐L‐00207
3/Jul/16
207 2015_22‐OC‐EEHC‐L‐00208
4/Jul/16
208 2015_22‐OC‐EEHC‐L‐00209
4/Jul/16
209 2015_22‐OC‐EEHC‐L‐00210
4/Jul/16
210 2015_22‐OC‐EEHC‐L‐00211
10/Jul/16
211 2015_22‐OC‐EEHC‐L‐00212
10/Jul/16
212 2015_22‐OC‐EEHC‐L‐00213
10/Jul/16
213 2015_22‐OC‐EEHC‐L‐00214
10/Jul/16
214 2015_22‐OC‐EEHC‐L‐00182
11/Jul/16
17/Jun/16
18/Jun/16
Closed
2015_22‐EEHC_OC‐L‐00002
2015_22‐EEHC_OC‐L‐00003
Closed Closed
Nomination of additional Fire fighting and detection system Commercial ‐ Safetec – Italy. Nomination of additional Electromechanical Installation Commercial Subcontractors ‐ TAQA ‐ Aarabia. Re 2015_22‐EEHC_SAG‐OC‐L‐00180 ‐ Re Nomination of Commercial Additional Sump Pumps Supplier.
Yes
1/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00005
Yes
1/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00007
Daily Reports from 04 June to 17 June 2016.
General
NO
Commercial
Yes
1/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00008
Commercial
Yes
1/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00006
Commercial
Yes
1/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00006
Commercial
Yes
3/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00009
Civil
NO
Closed
2015_22‐EEHC_OC‐L‐00013
Commercial
Yes
3/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00010
Commercial
Yes
3/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00011
Re 2015_22‐EEHC_SAG‐OC‐L‐00178 ‐ Re Nomination of Additional Suppliers of Valves. Nomination of Additional Valves Supplier. 1 Derval S r l – Italy Nomination of Additional Valves Supplier. 1 Fluitek – Italy Nomination of Additional Valves Supplier. 1 ETV S r L – Italy Guard Dormitory Building Architectural Drawing. Nomination of Additional Valves Supplier. 1 Bermer – Italy Re 2015_22‐EEHC_SAG‐OC‐L‐00170 ‐ Re Nomination of additional piping supplier. Daily Reports from 18 June to 24 June 2016. Nomination of additional valves supplier. 1 Alas Meccanica S r l – Italy Nomination of additional valves supplier.
Closed
Closed
NO
Closed
Commercial
Yes
8/Jul/16
Closed
Commercial 1 Orton Industrial Valves – Italy Re 2015_22‐EEHC_OC‐L‐00007 ‐ Nomination of Additional Commercial Supplier for Sump Pumps.
Yes
8/Jul/16
Closed
Yes
9/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00015
Commercial
Yes
9/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00016
Commercial
Yes
9/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00014
Commercial
Yes
15/Jul/16
Closed
Commercial
Yes
15/Jul/16
Closed
Commercial
Yes
15/Jul/16
Closed
Commercial
Yes
15/Jul/16
Closed
Mechanical
Yes
Re 2015_22‐EEHC_OC‐L‐00005 ‐Nomination of additional Electromechanical Installation Subcontractors. Re 2015_22‐EEHC_OC‐L‐00011 ‐Re Nomination of additional suppliers for piping. Re 2015_22‐EEHC_OC‐L‐00009 ‐Nomination of additional suppliers for valves. Re 2015_22‐EEHC_OC‐L‐00010 ‐Nomination of additional suppliers for valves. Re 2015_22‐EEHC_OC‐L‐00008 ‐Nomination of additional suppliers for valves. Re 2015_22‐EEHC_OC‐L‐00012 ‐Nomination of additional suppliers for valves Standard Colour for Gas Storage Cylinders.
Closed
2015_22‐EEHC_OC‐L‐00018
Nomination of Additional Valves Supplier. 1. Bray Controls – UK 2. ITALVALV – Italy Nomination of Additional Valves Supplier ‐TR Impianti – Italy. Re 2015_22‐EEHC_SAG‐OC‐L‐00175 ‐Re Nomination of Additional Supplier. Re 2015_22‐EEHC_SAG‐OC‐L‐00169 ‐ Works in Firefighting Water Tank. Orascom Construction Scope ‐Invoice no. 3. Re 2015_22‐EEHC_SAG‐OC‐L‐00186 ‐Re‐allocation of Well No.3 Pipeline.
215 2015_22‐OC‐EEHC‐L‐00215
11/Jul/16
216 2015_22‐OC‐EEHC‐L‐00216
11/Jul/16
217 2015_22‐OC‐EEHC‐L‐00218
11/Jul/16
218 2015_22‐OC‐EEHC‐L‐00221
11/Jul/16
219 2015_22‐OC‐EEHC‐L‐00223
13/Jul/16
220 2015_22‐OC‐EEHC‐L‐00220
16/Jul/16
221 2015_22‐OC‐EEHC‐L‐00225
17/Jul/16
Nomination of additional large HDPE pipes supplier ‐ Agru. Commercial
YES
222 2015_22‐OC‐EEHC‐L‐00217
18/Jul/16
Site Prepration Agreement ‐ Invoice No.9
Commercial
YES
223 2015_22‐OC‐EEHC‐L‐00227
18/Jul/16
Re 2015_22‐ EEHC_OC‐L‐00017 ‐ Re Nomination of Additional Suppliers for Valves.
Commercial
Yes
23/Jul/16
Closed
224 2015_22‐OC‐EEHC‐L‐00219
19/Jul/16
Re 2015_22‐ EEHC_OC‐L‐00016 ‐ Nomination of additional Commercial Electromechanical Installation Subcontractors – TAQA.
Yes
24/Jul/16
Closed
225 2015_22‐OC‐EEHC‐L‐00229
21/Jul/16
Re 2015_22‐ EEHC_OC‐L‐00013 ‐ Re Security Requirements Civil of Guard Dormitory Building.
NO
Closed
226 2015_22‐OC‐EEHC‐L‐00230
21/Jul/16
Daily Reports from 25 June to 15 July 2016.
NO
Closed
227 2015_22‐OC‐EEHC‐L‐00231
21/Jul/16
Slope Protection.
NO
Closed
228 2015_22‐OC‐EEHC‐L‐00222
21/Jul/16
229 2015_22‐OC‐EEHC‐L‐00228
21/Jul/16
230 2015_22‐OC‐EEHC‐L‐00224
21/Jul/16
231 2015_22‐OC‐EEHC‐L‐00226
26/Jul/15
232 2015_22‐OC‐EEHC‐L‐00234
26/Jul/15
233 2015_22‐OC‐EEHC‐L‐00233
26/Jul/15
234 2015_22‐OC‐EEHC‐L‐00232
28/Jul/16
235 2015_22‐OC‐EEHC‐L‐00235
28/Jul/16
236 2015_22‐OC‐EEHC‐L‐00236
1/Aug/16
237 2015_22‐OC‐EEHC‐L‐00237
2/Aug/16
238 2015_22‐OC‐EEHC‐L‐00238
4/Aug/16
Re Nomination of additional large HDPE pipes supplier.
239 2015_22‐OC‐EEHC‐L‐00239
7/Aug/16
240 2015_22‐OC‐EEHC‐L‐00241
18/Aug/16
Re 2015_22‐ EEHC_OC‐L‐00014 ‐Re Nomination of additional suppliers for piping ‐ Sarplast. Re 2015_22‐ EEHC_OC‐L‐00018 ‐Re Nomination of additional suppliers for valves RPV. Re 2015_22‐EEHC_SAG‐OC‐L‐00137 ‐ Re Sufficiency of site protection measures. Re 2015_22‐ EEHC_OC‐L‐00020 ‐Re Nomination of additional large HDPE pipes supplier ‐ AGRU Re 2015_22‐ EEHC_OC‐L‐00021 ‐Owner's rejection for additional nomination of valves suppliers. Re 2015_22‐ EEHC_OC‐L‐00015 ‐Re Nomination of additional suppliers for sump pumps Re 2015_22‐ EEHC_OC‐L‐00004 ‐Re Required Technical data ‐ Pumps. Nomination of additional Piping Supplier (Duker)
Commercial
Yes
16/Jul/16
Closed
Commercial
Yes
16/Jul/16
Closed
Commercial
NO
Closed
Mechanical
Yes
Closed
Commercial
NO
Closed
Civil
NO
Closed
General
22/Jul/16
2015_22‐EEHC_OC‐L‐00019
Closed Closed
Commercial
Yes
26/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00022
Commercial
Yes
26/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00023
Civil
NO
Commercial
Yes
30/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00025
Commercial
Yes
30/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00026
Commercial
Yes
22/Jul/16
Closed
2015_22‐EEHC_OC‐L‐00024
Mechanical
NO
Commercial
Yes
2/Aug/16
Closed
2015_22‐EEHC_OC‐L‐00027
Yes
5/Aug/16
Closed
2015_22‐EEHC_OC‐L‐00028
Re 2015_22‐ EEHC_OC‐L‐00025 ‐ Re Nomination of Commercial additional large HDPE pipes supplier. Re 2015_22‐ EEHC_OC‐L‐00019 ‐Re Orascom Construction Commercial Scope ‐Invoice no. 3.
Closed
Closed
NO
Closed
Commercial
Yes
Closed
2015_22‐EEHC_OC‐L‐00028
Shore Protection Authority Permit Payment.
Commercial
NO
Closed
2015_22‐EEHC_OC‐L‐00029
Re 2015_22‐EEHC_SAG‐OC‐L‐00191 ‐Re Drawing for Inhabited Building.
Civil
NO
Closed
2015_22‐EEHC_OC‐L‐00030
241 2015_22‐OC‐EEHC‐L‐00243
21/Aug/16
Site Prepration Agreement ‐ Invoice No.10
242 2015_22‐OC‐EEHC‐L‐00242
23/Aug/16
243 2015_22‐OC‐EEHC‐L‐00244
24/Aug/16
244 2015_22‐OC‐EEHC‐L‐00245
25/Aug/16
245 2015_22‐OC‐EEHC‐L‐00240
25/Aug/16
246 2015_22‐OC‐EEHC‐L‐00246
25/Aug/16
247 2015_22‐OC‐EEHC‐L‐00247
28/Aug/16
248 2015_22‐OC‐EEHC‐L‐00248
3/Sep/16
249 2015_22‐OC‐EEHC‐L‐00249
3/Sep/16
250 2015_22‐OC‐EEHC‐L‐00250
4/Sep/16
251 2015_22‐OC‐EEHC‐L‐00251
6/Sep/16
252 2015_22‐OC‐EEHC‐L‐00252
6/Sep/16
253 2015_22‐OC‐EEHC‐L‐00253
7/Sep/16
254 2015_22‐OC‐EEHC‐L‐00254
9/Sep/16
255 2015_22‐OC‐EEHC‐L‐00255
21/Sep/16
256 2015_22‐OC‐EEHC‐L‐00256
22/Sep/16
257 2015_22‐OC‐EEHC‐L‐00257
22/Sep/16
258 2015_22‐OC‐EEHC‐L‐00259
25/Sep/16
259 2015_22‐OC‐EEHC‐L‐00260
2/Oct/16
260 2015_22‐OC‐EEHC‐L‐00261
4/Oct/16
261 2015_22‐OC‐EEHC‐L‐00262
16/Oct/16
262 2015_22‐OC‐EEHC‐L‐00263
18/Oct/16
263 2015_22‐OC‐EEHC‐L‐00264
20/Oct/16
Decennial Liability Insurance Certificate.
Ciommercial
NO
264 2015_22‐OC‐EEHC‐L‐00258
27/Oct/16
Re 2015_22‐EEHC_OC‐L‐00043 ‐ Nomination of Additional Commercial Telecommunication Supplier
YES
265 2015_22‐OC‐EEHC‐L‐00265
27/Oct/16
Access Control on Site Enforcement.
General
NO
266 2015_22‐OC‐EEHC‐L‐00266
1/Nov/16
Nomination of additional Telecommunication Supplier ‐ FAAC Group – Italy.
Commercial
YES
Nomination of additional Telecommunication Supplier (FGM Electrical Service‐ ITALY) Re 2015_22‐EEHC_OC‐L‐00029 ‐ Re Revised Letter of Guarantee for Shore Protection Authority Nomination of additional Telecommunicaton Supplier. (Tesy Lab ‐ Italy) Orascom Construction Scope ‐Invoice no. 4. Nomination of additional Supplier of sump pumps (Salvatore Robuschi‐ Italy) Nomination of additional Telecommunication Supplier ‐ Universe. Nomination of additional Telecommunication supplier. 1. Commscope 2. Signamax Re 2015_22‐EEHC_OC‐L‐00033 ‐ Re Nomination of additional Telecommunication supplier. Nomination of additional Telecommunication Supplier ‐ Came – Italy. Nomination of additional Main and Fire Water Pumps Supplier ‐ Hyosung Good Spring. Re 2015_22‐EEHC_OC‐L‐00034 ‐Nomination of additional Telecommunications Supplier ‐ LEONI Alternatives Structure for Air Defense Forces. Re 2015_22‐EEHC_OC‐L‐00032 ‐Re Nomination of Additional Supplier of Sump Pumps. Nomination of additional Telecommunication Supplier ‐ CIAS – Italy. Orascom Construction Scope ‐Invoice no. 5.
Commercial
NO
Closed
Commercial
Yes
Commercial
NO
Commercial
Yes
Commercial
NO
Commercial
Yes
29/Aug/16
Closed
2015_22‐EEHC_OC‐L‐00032
Commercial
Yes
1/Sep/16
Closed
2015_22‐EEHC_OC‐L‐00034
Commercial
Yes
8/Sep/16
Closed
2015_22‐EEHC_OC‐L‐00035
Commercial
Yes
8/Sep/16
Closed
2015_22‐EEHC_OC‐L‐00036
Commercial
Yes
8/Sep/16
Closed
Commercial
Yes
10/Sep/16
Closed
2015_22‐EEHC_OC‐L‐00037
Commercial
Yes
10/Sep/16
Closed
2015_22‐EEHC_OC‐L‐00039
Civil
Yes
Commercial
Yes
14/Sep/16
Closed
Commercial
Yes
26/Sep/16
Closed
Commercial
NO
28/Aug/16
Closed
2015_22‐EEHC_OC‐L‐00031
Closed 29/Aug/16
Closed
2015_22‐EEHC_OC‐L‐00033
Closed
Closed 2015_22‐EEHC_OC‐L‐00038
Closed
Re 2015_22‐EEHC_OC‐L‐00036 ‐Re Nomination of additional Telecommunication Supplier. Nomination of additional Piping Supplier ‐ Sarplast & Nsguassero – Italy Re 2015_22‐EEHC_OC‐L‐00041 ‐Nomination of additional Piping Supplier
Commercial
Yes
27/Sep/16
Closed
Commercial
Yes
30/Sep/16
Closed
2015_22‐EEHC_OC‐L‐00041
Commercial
Yes
5/Oct/16
Closed
2015_22‐EEHC_OC‐L‐00042
Clarification for the HDPE Flange Backing.
Mechanical
NO
Closed
e‐mail
Nomination of Additional Telecommunication Supplier ‐ Commercial Microntel (Italy) & Ozak (Turkey). Re 2015_22‐EEHC_OC‐L‐00042 ‐ Nomination of additional Commercial Piping Supplier .
YES
20/Oct/16
Closed
2015_22‐EEHC_OC‐L‐00043
YES
24/Oct/16
Closed
2015_22‐EEHC_OC‐L‐00044
Closed 1/Nov/16
Closed Closed
5/Nov/16
Closed
2015_22‐EEHC_OC‐L‐00045
267 2015_22‐OC‐EEHC‐L‐00267
9/Nov/16
Orascom Construction Scope ‐Invoice no. 6.
Commercial
NO
Closed
268 2015_22‐OC‐EEHC‐L‐00268
9/Nov/16
Re 2015_22‐EEHC_OC‐L‐00044 ‐ Re Nomination of additional suppliers for piping
Commercial
NO
Closed
269 2015_22‐OC‐EEHC‐L‐00269
14/Nov/16
Re 2015_22‐EEHC_OC‐L‐00046 ‐ Re Hydrogen Generating Plant Offer.
Commercial
NO
Closed
270 2015_22‐OC‐EEHC‐L‐00270
15/Nov/16
Re 2015_22‐EEHC_SAG‐OC‐L‐00196 ‐Re Final Site Layout and Security Requirements .
Civil
NO
Closed
271 2015_22‐OC‐EEHC‐L‐00271
16/Nov/16
Nomination of Additional Lighting Fixtures Supplier ‐ C‐Lure ‐ Commercial Italy.
YES
272 2015_22‐OC‐EEHC‐L‐00272
23/Nov/16
Decennial Liability Insurance Policy.
Commercial
YES
Closed
273 2015_22‐OC‐EEHC‐L‐00273
29/Nov/16
Re Project Landscape.
Civil
NO
Closed
274 2015_22‐OC‐EEHC‐L‐00275
1/Dec/16
Access Control on Site ‐ Follow Up.
GEneral
NO
Closed
275 2015_22‐OC‐EEHC‐L‐00276
5/Dec/16
Orascom Construction Scope ‐ Invoice no. 7.
Commercial
NO
Closed
276 2015_22‐OC‐EEHC‐L‐00277
25/Dec/16
Project Landscape.
Civil
NO
Closed
277 2015_22‐OC‐EEHC‐L‐00278
3/Jan/17
Orascom Construction Scope ‐ Invoice no. 8.
Commercial
NO
Closed
2015_22‐EEHC_OC‐L‐00051
278 2015_22‐OC‐EEHC‐L‐00279
3/Jan/17
Nomination of additional Valves Supplier (LESER GmbH & Co. KG)
Commercial
Yes
7/Jan/17
Closed
2015_22‐EEHC_OC‐L‐00049
279 2015_22‐OC‐EEHC‐L‐00280
3/Jan/17
Nomination of additional Telecommunication Supplier (GPS Commercial Standard S.p.a.‐ Italy)
Yes
7/Jan/17
Closed
2015_22‐EEHC_OC‐L‐00050
280 2015_22‐OC‐EEHC‐L‐00281
8/Jan/17
Re 2015_22‐EEHC_OC‐L‐00049 ‐Re Nomination of additional Supplier of Valves.
Commercial
YES
12/01/2017
Closed
281 2015_22‐OC‐EEHC‐L‐00282
11/Jan/17
Orascom Construction Scope ‐ Invoice no. 8.
Commercial
NO
282 2015_22‐OC‐EEHC‐L‐00283
15/Jan/17
Nomination of additional Cable Trays Supplier ‐ Thomas & Commercial Betts – Saudi Arabia.
YES
19/01/2017
Closed
283 2015_22‐OC‐EEHC‐L‐00274
15/Jan/17
Nomination of additional Telecommunication Supplier ‐ Jablotron Alarm.
Commercial
YES
19/01/2017
Closed
284 2015_22‐OC‐EEHC‐L‐00284
15/Jan/17
Re 2015_22‐EEHC_OC‐L‐00050 ‐Re Nomination of additional Telecommunication Supplier.
Commercial
YES
19/01/2017
Closed
2015_22‐EEHC_OC‐L‐00052
285 2015_22‐OC‐EEHC‐L‐00285
19/Jan/17
Nomination of additional Piping Supplier
Commercial
YES
22/Jan/17
Closed
2015_22‐EEHC_OC‐L‐00053
286 2015_22‐OC‐EEHC‐L‐00286
24/Jan/17
The reduction of the Advance Payment Letters of Guarantee.
Commercial
YES
287 2015_22‐OC‐EEHC‐L‐00287
25/Jan/17
Nomination of additional Telecommunication Supplier ‐ Linergy ‐ Italy.
Commercial
YES
30/Jan/17
Closed
2015_22‐EEHC_OC‐L‐00054
288 2015_22‐OC‐EEHC‐L‐00288
29/Jan/17
Re 2015_22‐EEHC_OC‐L‐00053 ‐ Re Nomination of additional Supplier for Piping ‐ IPEX
Commercial
YES
2/Feb/17
Closed
2015_22‐EEHC_OC‐L‐00055
21/Nov/16
Closed
2015_22‐EEHC_OC‐L‐00047
2015_22‐EEHC_OC‐L‐00048
Closed
Closed
289 2015_22‐OC‐EEHC‐L‐00291
2/Feb/17
Orascom Construction Scope‐ Invoice no. 9.
Commercial
Closed
290 2015_22‐OC‐EEHC‐L‐00290
2/Feb/17
Re 2015_22‐EEHC_OC‐L‐00054 ‐ Re Nomination of additional Telecommuniction Supplier.
Commercial
YES
7/Feb/17
Closed
291 2015_22‐OC‐EEHC‐L‐00289
7/Feb/17
Re 2015_22‐EEHC_OC‐L‐00052 ‐Re Nomination of additional Telecommuniction Supplier.
Commercial
YES
11/Feb/17
Closed
292 2015_22‐OC‐EEHC‐L‐00292
10/Feb/17
Nomination of additional Lighting Fixtures Supplier ‐ Linergy Commercial ‐ Italy.
YES
15/Feb/17
Closed
293 2015_22‐OC‐EEHC‐L‐00293
13/Feb/17
Decennial Liability Insurance Certificate.
294 2015_22‐OC‐EEHC‐L‐00294
19/Feb/17
Nomination of additional Lighting Fixtures Supplier ‐ VELAN ‐ Commercial Russia.
Yes
20/Feb/17
Closed
295 2015_22‐OC‐EEHC‐L‐00296
20/Feb/17
Nomination of additional Overhead Travelling Cranes and Miscellaneous Hoists’ Supplier ‐ 1.FAS & KITO 2. MELONI 3. MISIA.
Commercial
Yes
24/Feb/17
Closed
296 2015_22‐OC‐EEHC‐L‐00297
23/Feb/17
Nomination of additional Lighting Fixtures Supplier ‐ Beghelli.
Commercial
Yes
27/Feb/17
Closed
297 2015_22‐OC‐EEHC‐L‐00299
27/Feb/17
Re Nomination of additional Overhead Travelling Cranes and Miscellaneous Hoists' Supplier.
Commercial
Yes
3/Mar/17
Closed
298 2015_22‐OC‐EEHC‐L‐00301
4/Mar/17
The Reduction of the Advance Payment Letters of Guarantee.
Commercial
NO
Closed
299 2015_22‐OC‐EEHC‐L‐00295
7/Mar/17
Operational Electrical Spare Parts for Two Years of Operation.
Commercial
NO
Closed
300 2015_22‐OC‐EEHC‐L‐00300
9/Mar/17
Orascom Construction Scope‐ Invoice no. 10.
Commercial
NO
Closed
301 2015_22‐OC‐EEHC‐L‐00302
21/Mar/17
Re Trip Event of Abu Qir – Burullus Circuit.
Electrical
NO
Closed
302 2015_22‐OC‐EEHC‐L‐00303
23/Mar/17
Offer for Operational Mechanical Spare Parts for Two Years Commercial of Operation.
NO
Closed
303 2015_22‐OC‐EEHC‐L‐00304
28/Mar/17
Access Control to Site.
General
NO
Closed
304 2015_22‐OC‐EEHC‐L‐00305
29/Mar/17
Offer No. 01 for Spare Parts for Two Years of Operation.
Commercial
NO
Closed
2015_22‐EEHC_OC‐L‐00059
305 2015_22‐OC‐EEHC‐L‐00307
19/Apr/17
Orascom Construction Scope‐ Invoice no. 11.
Commercial
NO
Closed
2015_22‐EEHC_OC‐L‐00060
306 2015_22‐OC‐EEHC‐L‐00309
27/Apr/17
Re Supporting Documentation for Invoice no. 11.
Commercial
NO
Closed
307 2015_22‐OC‐EEHC‐L‐00308
9/May/17
Orascom Construction Scope‐ Invoice no. 12.
Commercial
308 2015_22‐OC‐EEHC‐L‐00311
31/May/17
Orascom Construction Scope‐ Invoice no. 13.
Commercial
2015_22‐EEHC_OC‐L‐00056
Closed
2015_22‐EEHC_OC‐L‐00057
309 2015_22‐OC‐EEHC‐L‐00312
31/May/17
Nomination of additional Valves Supplier ‐ Prosave ‐ Korea. Commercial
Yes
310 2015_22‐OC‐EEHC‐L‐00313
4/Jun/17
6/Jun/17
Re Nomination of additional Valves Supplier.
Commercial
NO
311 2015_22‐OC‐EEHC‐L‐00314
6/Jun/17
Nomination of additional Telecommunication Supplier (Fitre S.p.a – Italy)
Commercial
Yes
312 2015_22‐OC‐EEHC‐L‐00306
20/Jun/17
Site Prepration Agreement‐ Invoice No. 11 ‐ Final Invoice
Commercial
NO
Closed
313 2015_22‐OC‐EEHC‐L‐00315
7/May/17
The Reduction of the Advance Payment Letters of Guarantee.
Commercial
NO
Closed
314 2015_22‐OC‐EEHC‐L‐00317
6/Jul/17
Orascom Construction Scope‐ Invoice no. 14.
Commercial
NO
Closed
10/Jun/17
Closed
2015_22‐EEHC_OC‐L‐00062
Closed
2015_22‐EEHC_OC‐L‐00064
Closed
2015_22‐EEHC_OC‐L‐00065
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
B 2.
Intern Siemens
DTL status
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
B 3.
Intern Siemens
Burullus Progress Report incl. Photos
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project
Power Generation Egypt Business Unit Al Burullus‐4x SCC5‐8000H 2x1 Power Plant Project Progress Report (No. 132) Cutoff date: August 1, 2017
Block (3)
Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project
Table of Contents 1. Project Key Milestones. 2. Progress Summary. 3. Manpower and Equipment. 4. Progress Photos.
Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project
1. Project Key Milestones
Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project
Project Key Milestones
Achieved Date
MV AVAILABLE (BACK ENERGIZING) 42 1ST. IGNITION GT42 POWER TO THE GRID 42 TOAC GT42 (AMENDMENT I) MV AVAILABLE (BACK ENERGIZING) 41 1ST. IGNITION GT41 POWER TO THE GRID 41 TOAC GT41 (AMENDMENT I) MV AVAILABLE (BACK ENERGIZING) 32 1ST. IGNITION GT32 POWER TO THE GRID 32 TOAC GT32 (AMENDMENT I) MV AVAILABLE (BACK ENERGIZING) 31 1ST. IGNITION GT31 POWER TO THE GRID 31 TOAC GT31 (AMENDMENT I) MV AVAILABLE (BACK ENERGIZING) 22 1ST. IGNITION GT22 POWER TO THE GRID 22 TOAC GT22 (AMENDMENT I) MV AVAILABLE (BACK ENERGIZING) 21 1ST. IGNITION GT21 POWER TO THE GRID 21 TOAC GT21 (AMENDMENT I)
13‐Dec‐16 28‐Dec‐16 29‐Dec‐16 21‐May‐17 21‐Dec‐16 22‐Jan‐16 22‐Jan‐16 20‐May‐17 28‐Dec‐16 12‐Jan‐16 12‐Jan‐16 02‐May‐17 31‐Dec‐16 15‐Jan‐16 15‐Jan‐16 22‐May‐17 10‐May‐17 30‐May‐17 30‐May‐17 16‐May‐17 31‐May‐17 31‐May‐17
Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project
2. Progress Summary
Power Generation Egypt Business Unit Al Burullus 4xSCC5-8000H 2x1 Power Plant Project Cutoff Date:August 01, 2017 Building/Area
Progress Summary Phase
Civil
Block (4)
Activity
Status
Remarks
STG for steel structure works annex
Ongoing
(96% Completed)
STG Building cladding works
Ongoing
(60% Completed)
Pipe rack for H.R.S.G steel works Unit (42)
Ongoing
(45% Completed)
Cooling Tower Unit (40) FRP structure works
Ongoing
(42% Completed)
Cooling Tower Unit (40) thermal fills support works
Ongoing
(28% Completed)
Cooling Tower Unit (40) mechanical frame erection works
Ongoing
(28% Completed)
Cooling Tower Unit (40) roof erection works
Ongoing
(28% Completed)
Cooling Tower Unit (40) piping distribution erectoin
Ongoing
(12% Completed)
Cooling Tower Unit (40) mechanical equipment erection works
Ongoing
(28% Completed)
Cooling Tower Unit (40) fan stack works
Ongoing
(28% Completed)
H.R.S.G Outlet duct and Stack assembly works Unit (42)
Ongoing
(30% Completed)
Lightning Protection System for Unit(42)
Ongoing
(60% Completed)
Lightning Protection System for Unit(41)
Ongoing
(60% Completed)
STG for steel structure works annex
Ongoing
(95% Completed)
Pipe rack for H.R.S.G steel works Unit (32)
Ongoing
(75% Completed)
STG Building cladding works
Ongoing
(60% Completed)
E/M
Civil
Cooling Tower Unit (30) FRP structure works
Ongoing
(98% Completed)
Cooling Tower Unit (30) roof erection works
Ongoing
(98% Completed)
Cooling Tower Unit (30) piping distribution erectoin
Ongoing
(98% Completed)
H.R.S.G Galleries and Ladders erection works Unit (31)
Ongoing
(50% Completed)
H.R.S.G Heating surface modules erection works Unit (31)
Ongoing
(91% Completed)
H.R.S.G piping works Unit (31)
Ongoing
(52% Completed)
Assembly and erection of Condenser neck Unit (30)
Ongoing
(50% Completed)
Block (3)
E/M
Power Generation Egypt Business Unit Al Burullus 4xSCC5-8000H 2x1 Power Plant Project Cutoff Date:August 01, 2017 Building/Area
Progress Summary Phase
Activity
Status
Remarks
CTG Building cladding works
Ongoing
(92% Completed)
STG Steel Structure erection works annex
Ongoing
(99% Completed)
STG Building cladding works
Ongoing
(70% Completed)
Feed water pumps steel works
Ongoing
(99% Completed)
LV Switch Gear Building internal painting works
Ongoing
(50% Completed)
LV Switch Gear Building external painting works
Ongoing
(50% Completed)
H.R.S.G Piping erection works for Unit (21)
Ongoing
(98% Completed)
Civil
Block (2)
E/M
Civil
H.R.S.G Piping erection works for Unit (22)
Ongoing
(76% Completed)
Welding outer casing bottom part L.P turbine
Ongoing
(20% Completed)
Assembly and erection of Condenser neck Unit (20)
Ongoing
(70% Completed)
Condensate exctraction pumps erection works Unit (20)
Completed
STG Steel Structure erection works main building
Ongoing
(98% Completed)
STG Building cladding works
Ongoing
(68% Completed)
Feed water pumps steel works
Ongoing
(99% Completed)
Erection Generator Platforms Unit (12)
Ongoing
(90% Completed)
Erection Generator Platforms Unit (11)
Ongoing
(90% Completed)
Seal oil supply system piping works Unit (12)
Ongoing
(26% Completed)
Seal oil supply system piping works Unit (11)
Ongoing
(23% Completed)
Generator Exhaust System piping works Unit (12)
Ongoing
(43% Completed)
Generator Exhaust System piping works Unit (11)
Ongoing
(27% Completed)
Air intake works unit (12)
Ongoing
(80% Completed)
Air intake works unit (11)
Ongoing
(80% Completed)
Welding outer casing bottom part L.P turbine
Completed
Assembly and erection of Condenser neck Unit (10)
Ongoing
(60% Completed)
H.R.S.G piping erection Unit (11)
Ongoing
(77% Completed)
H.R.S.G piping erection Unit (12)
Ongoing
(70% Completed)
Lube oil skid erection works unit (10)
Ongoing
(20% Completed)
Block (1)
E/M
Power Generation Egypt Business Unit Al Burullus 4xSCC5-8000H 2x1 Power Plant Project Cutoff Date:August 01, 2017
Progress Summary
Building/Area
Phase
Activity
Status
Remarks
Seal Well
Civil
PSP Line erection works
Ongoing
(68% Completed)
UPN sheet piles works
Completed
Water Discharge
Civil Velocity Cap UPC concrete works
Completed
Water treatment building finishing works
Ongoing
(95% Completed)
Water treatment building cable trays
Ongoing
(90% Completed)
Water treatment building cabling
Ongoing
(80% Completed)
Pre-treatment treatment system
Ongoing
(90% Completed)
Civil
Waste water system
Ongoing
(85% Completed)
Oil separation system
Ongoing
(85% Completed)
Sewage treatment system
Ongoing
(85% Completed)
Desalination system
Ongoing
(85% Completed)
Demineralization system
Ongoing
(90% Completed)
Neutralization system
Ongoing
(80% Completed)
Water Treatment Plant E/M
Workshop / Warehouse Building
Civil
Workshop / Warehouse building finishing works
Ongoing
(90% Completed)
Administration Building
Civil
Administration building finishing works
Ongoing
(80% Completed)
Gas Compressor Area
E/M
Gas compressor equipment erection works
Ongoing
(95% Completed)
Gate House Building
Civil
Main gate finishing works
Ongoing
(85% Completed)
Secondary Gate House
Civil
Secondary gate finishing works
Ongoing
(65% Completed)
Fire Fighting Station
Civil
Fire fighting station finishing works
Ongoing
(45% Completed)
Pump House
E/M
PAR Line erection works
Ongoing
(62% Completed)
Ducting structure part 5/11
Ongoing
(95% Completed)
Underground piping erection works
Ongoing
(75% Completed)
Gas pipe line fabrication works
Ongoing
(90% Completed)
Gas pipe line welding works
Ongoing
(85% Completed)
Gas pipe line inspected works
Ongoing
(80% Completed)
Fence foundation works
Ongoing
(91% Completed)
Ongoing
(85% Completed)
Duct Bank Underground piping
Gas Pipe Line
E/M
E/M
Permanent Fence
Civil
Fence super structure works Fence finishing works
Ongoing
(41% Completed)
Piles
Civil
Wick drain piles works
Ongoing
6471 out of 10005 piles are finished
Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project
3. Manpower and Equipment
Al Burullus-4x SCC5-8000H 2x1 Power Plant Project (OC - Man power Report) Cutoff Date:August 01, 2017
Day
SR
A
OC
Category Admin Staff and Supervision Personnel (Indirect Manpower)
1 Project Manager
MEGA
OCF
Total Manpower on payroll
Basic Labors on site this day
2
2
Total Manpower on payroll
Basic Labors on site this day
Night
IREM
Total Manpower on payroll
Basic Labors on site this day
1
1
2 Deputy Project Manager
Total Manpower on payroll
GENCO
Basic Labors on site this day
Total Manpower on payroll
ROSA
Basic Labors on site this day
Total Manpower on payroll
Other Sub-Contractors
Basic Labors on site this day
5
4
1
1
4
4
1
1
3
2
Total Manpower on payroll
OC
OCF
MEGA
IREM
GENCO
ROSA
Other SubContractors
Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors on site this day on site this night on site this night on site this night on site this night on site this night on site this night on site this night 0
0
Total Manpower on payroll
Total Basic Labors Total Basic Labors Total Basic Labors on site this day on site this night on site day & night
0
0
9
8
0
8
0
0
5
5
0
5
0
3 Site Manager
1
1
2
1
4
4
0
0
0
4 Construction Manager
7
5
0
0
3
3
1
0
0
10
8
1
9
5 Technical Office Manager
1
1
0
0
5
5
0
0
0
6
6
0
6
6 Technical Office Engineer
14
11
5
4
8
6
0
0
0
21
1
1
1
0
7 Electrical Manager
10
8
0
8
27
21
0
0
0
2
1
0
1
8 Electrical Engineer
14
11
5
5
13
8
1
1
1
0
0
0
33
25
1
26
9 Electrical Supervisors
5
1
4
3
13
11
2
2
0
0
0
0
24
17
0
17
10 Civil Engineers
39
30
40
30
5
35
11 Mechanical Manager
16
14
23
18
2
2
0
2
0
41
34
2
36
12 Mechanical Engineers
36
30
0
1
0
83
68
1
69
13 Civil Supervisors
61
45
0
66
48
6
54
14 Mechanical Supervisors
4
4
0
0
0
29
16
0
16
15 Finisher Supervisors
4
4
4
4
0
16 Material manager
3
2
17 Material controller
10
7
1
5
23
23
11
5
11
9
0
5
3
6
1
1
6
4
18
7
0
0
0
0
5
3
2
0
22
7
0
7
5
0
5
52
34
0
34
5
2
2
36
1
1
0
0
9
7
34
11
6
0
0
0
0
91
55
6
61
7
7
19
17
27
23
3
2
24
0
1
2
0
168
135
27
162
2
2
2
2
4
4
0
0
2
1
9
9
1 1
26 QA/QC Engineers
46
36
0
1
0
12
1
29 Commissioning Supervisor
3
0 6
5
1
1
30
13
0
30 QC Land Surveyors / Assistants مساح
4
3
31 QA/QC Supervisor
31
21
32 Surveying Manager
1
1
33 Land Surveyors / Assistants مساح
13
10
2
2
2
2
11
8
2
2
34 Land Surveyors / Assistants helper مساعد مساح
16
15
2
1
3
2
2
2
1
1
1
1
1
1
26
23
1
1
35 Financial Manager 3
2
5
5
38 Logistics Manager
7
11
5
0 0
0
0
0 1 3
0
2
0
0
1
0
0
0
0
1
0
0
1
0
0
2
1
5
5
1
1
0
2
2
12
9
2
1
0
0
0
5
5
7
6
16
7
0
0
12
8
7
0
1
1
0
0
40 Admin
7
6
4
3
41 Admin Staff
8
5
42 Data Entry
8
5
0
0
43 Secretary
2
1
2
2
44 IT Engineer
1
1
2
2
6
6
3
3
4
4
11
4
45 Planning Engineers 46 Cost Controller
1
0
0
0
47 Timekeepers
26
22
2
2
0
8
1
1
1
0
0
50 Stores Staff
41
31
2
2
51 Stores Staff Helper
24
15
2
2
52 Drivers
110
89
4
53 Supervisor
10
7
1
54 Transportation supervisor
28
18
55 Accommodation Responsible
5
3
56 Copier
5
3
57 Office Boy
29
19
58 Permit Man
3
59 Purchase Supervisor 60 Security 61 Male Nurse Total A
1
1
1
1
3
3
1
194
89
8
3
1024
720
43
38
6
5
1
1
0
0
0
13
5
5
0
22
4
6
0
4
18
14
11
2
11
1
10
7
11
10
2
3
3
6 1
1
5
5
22
14
2
1
3
3
126
113
371
293
3
1
4
45
5
50
2
2
0
2
30
24
1
25
24
21
2
23
0
0
0
0
0
10
0
17
1
1
0
1
0
0
0
39
27
0
27
20
13
1
14
16
13
0
13
5
4
0
4
4
4
0
4
12
10
0
10
0
0 0
0
2
0
0
7
1
0
0
0
39
28
4
32
0
0
0
0
2
2
0
2 52
8
38
0
1
0
143
109
12
121
1
0
0
32
25
3
28
6
28
18
6
24
0
5
3
0
3
0
5
3
0
3
0
84
56
2
58
5
3
0
3
0
239
119
103
222
0
186
1
7
6
0
0
0
0
1
0
8
0
3 0
4 58
30
95
0
0
46
11 0
0
60
18
124
0
68
2
1
1 0
3
0
8
267
60
0 0
0
0
0
5
1 0
2
0
0
55
1 0
0
21
5
83
10
0
9
27
1 13
17
6 0
9
0 0
12
0
2
0
1 13
21
0
0
9
1 14
0
0
3
32
8 1
0
0
6
1
0 0
0
1
12
1
8 1
0
48 Procurement Staff 49 Warehouse Manager
8
7
0
11
0
0
1
0
0
0
39 HR
11
2 9
0 13
27 coordinator
37 Document Controllers
0
0
28 inspector
36 Accounts Staff
0
(Detailes Currently Not Available)
1 1
0
0 0
86
23 Workshop Mechanics Helper
0
4
0 0
47
25 QS Engineers
5
0
112
24 Pump Engineer
1
1 15
20 HSE Engineers / Officers / Helper
22 Workshop Mechanics
1
1 15
19 HSE Engineers
21 QA/QC Manager
3
5
(Detailes Currently Not Available)
3
2
0
(Detailes Currently Not Available)
18 HSE Manager
1
12
0
0
0
3
23
0 0
0
0
11
1
12
14
7
3
10
1,831
1,288
212
1,500
Al Burullus-4x SCC5-8000H 2x1 Power Plant Project (OC - Man power Report) Cutoff Date:August 01, 2017
Day
SR
OC
Category
OCF Total Manpower on payroll
MEGA Total Manpower on payroll
Night
IREM Total Manpower on payroll
GENCO Total Manpower on payroll
ROSA
3
Dump Driver
10
6
Excavator Drivers
5
3
0
0
1
0
Excavator Drivers Helper
0
0
1
1
0
loader Drivers
6
3
0
0
2
Forklift Drivers
3
2
1
1
0
0
Compactor Drivers
1
1
Trailer Drivers
6
5
Trailer Drivers Helper
5
5
Agricultural Tractor Drivers سائق جرار
14
8
0
0
Crane Drivers
48
30
6
6
11
10
Basic Labors on site this day
Basic Labors on site this day
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
IREM
GENCO
ROSA
Other SubContractors
Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors on site this day on site this night on site this night on site this night on site this night on site this night on site this night on site this night 0
3
2
1
4
0
4
3
0
3
10
6
0
6
5
3
1
4
0
1
1
0
1
0
6
3
2
5
10
7
1
8
1
1
0
1
1
0
0 8
4
0
0
0
0
0
16
13
0
0
8
4
Total Basic Labors Total Basic Labors Total Basic Labors on site this day on site this night on site day & night
5
0
4
Total Manpower on payroll
12
0
3
0
4
0
0
0
0
1
0
9
0
9
5
5
0
5
14
8
3
11
78
53
5
58
Crane Helper
1
1
12
11
0
11
1
1
0
1
1
0
1
Concrete Mixer Drivers
0
0
0
0
0
0
0
Concrete Mixer Chiseler
0
0
0
0
0
0
0
Pump Operator
1
1
0
1
1
0
1
Pump Operator Helper
11
6
1
11
6
1
7
Equipment Operators سائق معدة/ مشغل
0
0
7
6
7
6
0
6
Equipment Electrical
3
3
2
2
Equipment Electrical Helper
1
0
Carpenters Forman ريس نجارين
9
7
Site Carpenters نجارين موقع
96
66
0
0
0
0
4
3
Carpenter Helper مساعد نجار
6
6
Grinderحجار
36
33
8
0
Steel Fixers Forman ريس حدادين
4
4
3
3
Steel Fixers حدادين
33
30
0
0
Grinder Helper
Steel Fixers Helper
9
9
Scaffolders Technical
10
9
0
0
21
17
5
3
14
13
187
152
63
26
144
115
4
4
8
7
26
17
11
2
0
0
0
1
2 19
0
0
0 0
0
0
0
0
0
0
Scaffolders Foreman ريس شده
Scaffolders Helper
0
0
Scaffolders عمال شده Scaffolders Carpenters
0
0
14
Concrete Mixer Forman
Civil 21
MEGA
(Detailes Currently Not Available)
5
4
5
Basic Labors on site this day
(Detailes Currently Not Available)
4
12
Total Manpower on payroll
Bobcat Drivers
Basic Labors on site this day
(Detailes Currently Not Available)
3
Basic Labors on site this day
OCF
Basic Labors on site this day
Equipment Operators سائق معدة/ مشغل
2
Total Manpower on payroll
OC
Total Manpower on payroll
B Work Men (Direct)
1
Other Sub-Contractors
244
75
12
6
1
0 0
Bentonite Technician
0
0
0
0
9
7
2
9
100
69
19
88
6
6
0
6
44
33
0
33
0
0
0
0
7
7
0
7
33
30
0
30
9
9
0
9
254
84
1
85
0
52
39
2
41
0
5
394
293
25
318
8
7
1
8
0
30
21
1
22
1
0
0 0
5 1
0
9 0
0 1
2
1
labors leader ريس عمال
5 0
20
Concrete Forman مشرف خرسانة Concrete Labor فورمجيه
5 1
0
0
labors عمال
0
0
0
0
11
2
9
11
0
0
0
0
0
0
0
0
0
0
0
0
Chiseler Forman نحات
3
2
0
3
2
0
2
Chiseler نحات
36
28
2
36
28
2
30
Plumbing Foreman مشرف سباكين
2
2
0
2
2
0
2
Plumbers سباكين
25
15
5
25
15
5
20
Plumber Helper مساعد سباك
24
19
24
19
4
23
Electrician Supervisor مشرف كھربائي
32
28
38
31
0
31
Electricians كھربائية
93
75
148
107
12
119
Electrician Helper مساعد كھربائي Total B
4
2
2
15
1
6
3
38
29
11
10
0
0
18
4
25
21
803
616
30
28
101
34
266
207
0 0
0
0
0
19
4
305
98
9
486
486
0 0
0
3
1
0
0
0
88
0
0
10
0 0 0
0
0
73
39
1
40
1,991
1,469
98
1,567
Al Burullus-4x SCC5-8000H 2x1 Power Plant Project (OC - Man power Report) Cutoff Date:August 01, 2017 SR
Day
C Architectural Work Men (Direct)
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
Total Manpower on payroll
Basic Labors on site this day
Total Manpower on payroll
Night GENCO
IREM
Basic Labors on site this day
Total Manpower on payroll
Basic Labors on site this day
Total Manpower on payroll
ROSA
Basic Labors on site this day
Total Manpower on payroll
Other Sub-Contractors
Basic Labors on site this day
Total Manpower on payroll
OC
OCF
MEGA
IREM
GENCO
ROSA
Other SubContractors
Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors on site this day on site this night on site this night on site this night on site this night on site this night on site this night on site this night
Total Manpower on payroll
Total Basic Labors Total Basic Labors Total Basic Labors on site this day on site this night on site day & night
Mason Supervisor مشرف بنايين
1
1
0
1
1
0
1
Mason Foreman ريس بنايين
2
2
0
2
2
0
2
Mason Helper
0
0
0
0
0
0
0
0
0
0
0
15
0
15
Mason بنا Plasters مبيض محاره
18
15
0
18
Plasters Helper مساعد مبيض محاره Accessories Plaster )اكسسورات(مبيض محاره
10
8
0
10
8
0
8
11
10
0
11
10
0
10
Accessories Plaster Helper )اكسسورات(مساعد مبيض محاره
5
4
5
4
0
4
Painter Forman ريس نقاش
2
2
4
4
0
4
Painter نقاش
19
17
82
45
0
45
Painter Helper مساعد نقاش
3
3
Forman
0
23
8
2
2
15
10
2
0
0 25
10
0
0
0
0
0
0 5
5
0
0
Silicon Technician فني سيليكون Tiller
0
0
Tiller Helper
0
0
Supervisor Mechanical Rigger مشرف عمال ميكانيكي بحريه
4
4
118
82
Rigger
0 0
2
2
Rigger Helper Fitter براد Fitter Foreman Civil Workshop ريس برادين ورشه
114
97
0
0
7
3
13
7
10
1
49
24
71
51
83
36
3
2
6
0
Steel Fitter
2
2 39
86
47
111
40
Steel Grinder
3
3
18
14
0
0
70
20
Electrical Fitter Erection Fitter
118
93
Fitter Helper
57
51
0
0
Erection Grinder
4
4
27
9
Erection Helper
4
2
Welders Foreman
2
2
0
49
Steel Helper Cable Tay Helper
0
37
15
14
3
0 25
1
0
0
4
71
0 0
0
0
0 0 0
0
0
0
0 0
0 0
66
43
46
31
16
12
0 11
0
0
(Detailes Currently Not Available)
4
Basic Labors on site this day
MEGA
(Detailes Currently Not Available)
3
Total Manpower on payroll
OCF
(Detailes Currently Not Available)
1 2
OC
Category
0
0
0
0
0
0
3
0
5
0
0
0
0
0
0
0
0
0
0
0
0
34
15
1
16
323
195
100
295
3
2
0
2
120
97
0
97
2
2
0
2
135
86
0
86
114
43
0
43
18
14
0
14
37
15
0
15
14
3
0
3
5
254
156
18
174
57
51
0
51
6
77
44
6
50
3
20
14
3
17 16
3
2
8
6
1
1
24
14
2
34
9
28
0
0
0
62
9
0
9
Plate Welder
15
4
10
8
0
2
25
12
2
14
0
0
45
26
0
26
0
4
47
25
4
29
0
2
0
82
47
2
49
GTAW Welder
15
3
14
13
Tack Welder
23
8
24
17
SMAW Welder
14
7
62
34
6
6
0
3 5
Welding Grinder
16
4
13
3 7
10
0
0
Welders
62
58
0
0
3
1
14
8
29
3
0
0
0
0
0
108
70
0
70
Welders Helper
20
18
1
0
31
14
41
32
99
7
0
0
0
6
0
192
71
6
77
Welders Civil Workshop لحامين ورشه
1
1
1
1
0
1
0
0
0
0
1,937
1,109
144
1,253
0
Grinder Civil Workshop Total C
575
474
8
7
323
114
504
332
0
0
527
182
0
0
38
0
1
34
0
71
0
Al Burullus-4x SCC5-8000H 2x1 Power Plant Project (OC - Man power Report) Cutoff Date:August 01, 2017 SR.
Day OCF
OC
Category Total Manpower on payroll
Basic Labors on site this day
1 Crane Mechanical
2
2
2 Mechanical
15
8
3 Mechanical Helper
4
2
D Work Men. Mechanical (Direct)
Total Manpower on payroll
MEGA
Basic Labors on site this day
27
Basic Labors on site this day
GENCO
Total Manpower on payroll
Basic Labors on site this day
0
0
Total Manpower on payroll
Other Sub-Contractors
ROSA
Basic Labors on site this day
Total Manpower on payroll
Basic Labors on site this day
Total Manpower on payroll
OC
OCF
MEGA
IREM
GENCO
ROSA
Other SubContractors
Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors on site this day on site this night on site this night on site this night on site this night on site this night on site this night on site this night 0
4 Mechanical Fitter 5 Man lift Driver
Total Manpower on payroll
Night
IREM
17
12
5
4
3
2
0
21
12
20
16
36
17
5
4
0
0
6 Filter supervisor
0
0
7 Filter Grinder
0
0
8 Filter Fitter
2
0
1
4
2
Total Basic Labors Total Basic Labors Total Basic Labors on site this day on site this night on site day & night
2
2
0
2
15
8
2
10
0
0
0
22
10
1
11
0
0
0
77
45
0
45
0
1
32
21
5
26
0
0
0
0
2
2
0
2
0 2
Total Manpower on payroll
0
0
0
0
5
5
0
0
5
5
0
5
148
115
1
1
7
4
17
0
0
156
120
17
137
10 Erection Helper
9
6
9
2
0
0
1
0
0
18
8
1
9
11 Grader Driver
2
2
2
2
0
2
43
21
0
21
153
74
0
74
67
30
0
30
142
80
0
80
20
9
0
9
2
2
0
2
10
8
1
9
32
23
0
23
80
43
0
43
2
2
8
8
33
11
13 Piping Grinder
22
11
57
47
74
16
14 Piping Helper
11
9
8
7
48
14
15 Piping Fitter
25
19
48
37
69
24
0
(Detailes Currently Not Available)
12 Piping Forman
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
(Detailes Currently Not Available)
0
(Detailes Currently Not Available)
9 Erection Supervisor
16 Grinder Mechanical
13
4
7
5
17 haydrotest Supervisor
0
0
2
2
18 Supports Foreman
2
2
8
6
15
11
17
12
14
7
5
4
21 Supports Helper
0
0
1
0
0
0
1
0
0
0
22 Painting forman
0
0
1
1
0
0
1
1
0
1
60
47
0
0
19 Supports Fitter 20 Supports Grinder
32
29
29
3
38
0
9
0
23 Insulation
26
20
124
76
0
76
24 Instrument Fitter
1
1
0
0
1
1
0
1
25 E &I Fitter
9
1
0
9
1
0
1
0
0
0
0
101
1
102
26 Welders Mechanical 27 Technical
101
94
1
1
3
1
1
1
18
4
1
0
3
3
5
0
19
2
85
60
46
14
24
4
205
110
351
271
0
0
393
112
1019
Basic Labors on site this day
Total Manpower on payroll
Basic Labors on site this day
Total Manpower on payroll
Basic Labors on site this day
Total Manpower on payroll
Basic Labors on site this day
Total Manpower on payroll
28 Erection Mechanical
57
44
29 Helper
268
218
Total D
665
537
4
OCI Manpower
Total Manpower on payroll
Basic Labors on site this day
Total Manpower on payroll
Basic Labors on site this day
Total Manpower on payroll
0
0
0
124 60
47
5
52
0
0
0
418
294
24
318
30 Welders Mechanical Helper
OCF
OC
MEGA
IREM
GENCO
ROSA
1019
55
0
0
2
0
0
0
Other Sub-Contractors
OC
OCF
MEGA
IREM
GENCO
ROSA
Other SubContractors
Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors on site this day on site this night on site this night on site this night on site this night on site this night on site this night on site this night
0
0
0
0
2,637
2,053
57
2,110
Total Manpower on payroll
Total Basic Labors Total Basic Labors Total Basic Labors on site this day on site this night on site day & night
Direct
2043
1627
42
39
629
258
1121
810
0
0
1225
392
1505
1505
181
0
1
46
0
71
0
6565
4631
299
4930
Indirect
1024
720
43
38
126
113
371
293
0
0
267
124
0
0
186
0
3
23
0
0
0
1831
1288
212
1500
Total
3067
2347
85
77
755
371
1492
1103
0
0
1492
516
1505
1505
367
0
4
69
0
71
0
8396
5919
511
6430
0 29‐Jul‐17
21‐Jul‐17
13‐Jul‐17
5‐Jul‐17
27‐Jun‐17
19‐Jun‐17
11‐Jun‐17
3‐Jun‐17
26‐May‐17
18‐May‐17
10‐May‐17
2‐May‐17
24‐Apr‐17
16‐Apr‐17
8‐Apr‐17
31‐Mar‐17
23‐Mar‐17
15‐Mar‐17
7‐Mar‐17
27‐Feb‐17
19‐Feb‐17
11‐Feb‐17
3‐Feb‐17
26‐Jan‐17
18‐Jan‐17
10‐Jan‐17
2‐Jan‐17
25‐Dec‐16
17‐Dec‐16
9‐Dec‐16
1‐Dec‐16
23‐Nov‐16
15‐Nov‐16
7‐Nov‐16
30‐Oct‐16
22‐Oct‐16
14‐Oct‐16
6‐Oct‐16
28‐Sep‐16
20‐Sep‐16
12‐Sep‐16
4‐Sep‐16
27‐Aug‐16
19‐Aug‐16
11‐Aug‐16
3‐Aug‐16
26‐Jul‐16
18‐Jul‐16
10‐Jul‐16
2‐Jul‐16
24‐Jun‐16
16‐Jun‐16
8‐Jun‐16
31‐May‐16
23‐May‐16
15‐May‐16
7‐May‐16
29‐Apr‐16
21‐Apr‐16
13‐Apr‐16
5‐Apr‐16
28‐Mar‐16
20‐Mar‐16
12‐Mar‐16
4‐Mar‐16
25‐Feb‐16
17‐Feb‐16
9‐Feb‐16
1‐Feb‐16
24‐Jan‐16
16‐Jan‐16
8‐Jan‐16
31‐Dec‐15
23‐Dec‐15
15‐Dec‐15
7‐Dec‐15
29‐Nov‐15
21‐Nov‐15
13‐Nov‐15
5‐Nov‐15
28‐Oct‐15
20‐Oct‐15
12‐Oct‐15
4‐Oct‐15
26‐Sep‐15
18‐Sep‐15
7,000
10‐Sep‐15
2‐Sep‐15
25‐Aug‐15
17‐Aug‐15
9‐Aug‐15
1‐Aug‐15
24‐Jul‐15
16‐Jul‐15
8‐Jul‐15
30‐Jun‐15
Al - Burullus Combined Cycle Power Plant Project (Total - Manpower Curve)
8,000
Total Day Shift
Total Night Shift
6,000
Total Day Shift
Total Night Shift
5,000
4,000
3,000
2,000
1,000
Al Burullus-4x SCC5-8000H 2x1 Power Plant Project Equipment Daily Report Cutoff Date:August 01, 2017
Day Shift
Sr. EQUIPMENT DETAILS
OC (OED)
OC Renting Equipment
OC Foundation
IREM
1
CRANE CROWLER SANY 700 TONS
2
CRANE CROWLER SANY500 TONS
طن500ونش كاتينة
3
CRANE CROWLER 400 TONS
طن400 ونش كاتينة
1
4
CRANE CROWLER SANY 300 TONS
طن300 ونش كاتينة
1
5
CRANE CROWLER SANY225 TONS
طن225 ونش كاتينة
1
6
CRANE CROWLER SANY 160TONS
طن160 ونش كاتينة
7
CRANE CROWLER SANY 55 TONS
طن55 ونش كاتينة
1
8
CRANE CROWLER SANY 50 TONS
طن50 ونش كاتينة
7
9
CRANE GROVE 160 TONS
طن160 ونش
10 CRANE GROVE 130 TONS
طن130 ونش
11 CRANE GROVE 120 TONS
طن120 ونش
12 CRANE GROVE 100 TONS
طن100ونش
13 CRANE GROVE 90 TONS
طن90ونش
3
16 CRANE GROVE 70 TONS
طن70 ونش
1
17 CRANE GROVE 60 TONS
طن60 ونش
18 CRANE GROVE 65 TONS
طن65 ونش
7
19 CRANE CROWLER 50 TONS
طن50 ونش
3
20 CRANE GROVE 40 TONS
طن40 ونش
1
1
1 1
1
1
1
1
1
1
2
6
2
6
3
طن35 ونش
5
طن12.5 ونش
2
طن30 ونش
24 Tower Crane
1
1 2
1
3
5 7
25 Bored Piles Rigs
1
26 Driven Piles Rigs 27 Bobcat
4
1
2
3
3 لودر
29 Baco LOADER. 30 Excavator
OC (OED)
1
طن80 ونش
28 Loader
ROSA
1
طن75 ونش
23 CRANE GROVE 30 TONS
GENCO
1
14 CRANE GROVE 80 TONS
21 CRANE CROWLER 35 TONS
MEGA
1
15 CRANE GROVE 75 TONS
22 CRANE CROWLER 12.5TONS
Night Shift
5
29
1
1 حفار
1
3
31
31 Grader CAT-140G
1
1
32 Generator volvo-40 K.V.A مولد
2
33 Generator volvo-60 K.V.A مولد
3
1 2 4
34 Generator volvo-90 K.V.A مولد 35 Generator volvo-105 K.V.A مولد
1
3
1
36 Generator volvo-135 K.V.A مولد
2
37 Generator volvo-125 K.V.A مولد
2
38 Generator volvo-175 K.V.A مولد
1
1
39 Generator volvo-200 K.V.A مولد
9
1
40 Generator volvo-211 K.V.A مولد
1
41 Generator volvo-225 K.V.A مولد 42 Generator volvo-250 K.V.A مولد
7
1
2
43 Generator volvo-275 K.V.A مولد
2
44 Generator volvo-315 K.V.A مولد
4
45 Generator 450 K.V.A
1
46 Generator volvo-410 K.V.A مولد
1
47 Generator volvo-500 K.V.A مولد
4
48 AIR COMPRESSOR 49 AIR COMPRESSOR ATLAS XA-186DD
1 كومبريسسور
50 AIR COMPRESSOR ATLAS XATS-156DD
1
1
5
7
51 AIR COMPRESSOR SULLAIR 300 52 SOIL Compactor
2
2 2
3 2
3
53 LIGHTING TOWER ATLAS QAX - 12
5
2
54 Mobile- Concrete pump s42 sx
1
55 CONCRETE-TRUCK MIXER MERCEDES 10m
2
56 CONCRETE-TRUCK MIXER MERCEDES 8m
ھراس تربة
1 6
5
OC Renting Equipment
OC Foundation
IREM
MEGA
GENCO
ROSA
Al Burullus-4x SCC5-8000H 2x1 Power Plant Project Equipment Daily Report Cutoff Date:August 01, 2017
Day Shift
Sr. EQUIPMENT DETAILS
OC (OED)
OC Renting Equipment
OC Foundation
IREM
Night Shift
MEGA
GENCO
ROSA
OC (OED)
OC Renting Equipment
OC Foundation
IREM
MEGA
GENCO
ROSA
0
0
0
0
0
0
57 FUEL STATION 45,000 LITER 58 Dumper-Front 59 Welding Machine DESIL
ماكينة لحام
60 trailer
24
55
2
1
61 Fuel Trailer
2
62 Flate trail
2
2
3
63 Flate trail 8m
1
64 Flate trail 6m
2
65 Flate trail 4m 66 Truck tanker < 22m3 67 Truck 10 Ton
1
68 Truck 4 Ton
3
1
طن5 سيارة نقل
4
1
جرار
15
1
69 Truck 5 Ton
6
70 Truck
3
12
71 Tractors 72 Truck 12.5 Ton
7
1
73 Plate Compactor
ھراس يدوي
74 Mini bus 26 Seat
7
75 Micro Bus 14 seat
18
6
2 8
76 Ambulance
3
1
3
1
77 Double Cabinet
20
5
2
2
8
9
78 Single Cabinet
16
2
2
3
6
79 Cars
36
1
7
3
80 Steel Rebar cutter
6
81 Steel Rebar bender تنايه حديد
1
82 Electric Mixer 1/4 M 83 Electric Mixer 3/4 M 84 Vibrator diesel ھزاز
1
4
85 Vibrator electrical 86 Helicopter 87 Water Trailer
2
88 Micro Bus 15 seat
2
89 Clark
1
2
4
38
12
90 Saw cut 91 Hammer
3
92 Heater 93 Optical Level 94 Electrical Vibrator Nail ھزاز
1
95 Electrical Welding Machine ترانس لحام كھربيه
8
96 Welding Machine DESIL ماكينه لحام
7
97 Dump Truck
4
10
160 52
65
4
98 Block Saw Cut Golz 16 Inch 99 Washing Machine 200 Par
1
100 Truck 10 Ton Scania 101 Forklift شوكه
2
2
1
10
1
102 Small Air Compressor 500 litre 103 Man Lift
1
11
104 Bentonite Tank 2.5*2.5*6 M
4
5
1
229
68
18
105 Bentonite Tank 2*2.5*6 M 106 Bentonite Mixer 1000hp 107 Bentonite Mixer 1500hp
3
108 Decender 2000hp 109 Water Tank
تنك مياه
110 Sand Blast 111 Drilling Machine
10
112 Drill Press Machine 113 Water Pump
30
4
114 Vaccum machine 115 Oil filter mchine
2 Total
239
128
135
162
112
19
Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project
4. Progress Photos
Power Control Center (40): Steel erection works.
STG Unit (40): Steam turbine Works.
STG Unit (40): Base module Works.
STG Turbo Set (40): Low pressure turbine outer casing erection works.
STG Unit (40): Condenser Works.
HRSG Unit (41): Piping & casing erection Works.
HRSG Unit (42): Piping & casing erection Works.
HV Transformer Unit (40): Placement works
Cooling Tower Unit (40): FRP works.
STG Building (30): Steam turbine works.
STG Turbo Set (30): Low pressure turbine outer lower casing erection works.
STG Building (30): Base Module works.
STG Building (30): GRP steel erection works.
HRSG (31): Stack & external piping erection works.
HRSG (32): Stack & external piping erection works.
HV Transformer Unit (30): Main transformer works.
Cooling Tower Unit (30): FRP & cladding works.
Pipe Rack HRSG Unit (22): Erection works.
HRSG (21): Stack erection & external piping works.
HRSG (22): Stack erection & external piping works.
STG Building (20): Base Module works.
STG Block (20): GRP piping Works.
STG Building (20): Annex wall cladding works.
STG Building (20): Annex Roof cladding works.
HV Transformer Unit (20): Erection works.
Cooling Tower Unit (20): FRP & cladding works.
CTG Turbo Set (11): Gas turbine enclosure works.
CTG Turbo Set (12): Gas turbine enclosure works.
MV Auxiliary & Generator Transformer (Unit 11): Iso phase bus duct works.
MV Auxiliary & Generator Transformer (Unit 12): Iso phase bus duct works.
Pipe Rack HRSG (12): Steel erection & piping works.
HRSG (11): Stack & external piping erection Works.
HRSG (12): Stack & external piping erection Works.
Power Control Center (10): Erection Works.
STG Turbo Set (10): Steam generator works.
STG Block (10): GRP piping Works.
STG Building (10): Annex roof cladding Works.
STG Building (10): Annex walls cladding Works.
HV Transformer Block (10): Erection Works.
Sealing End Unit (10): Erection works.
PCC Cooling Tower Unit (11): Erection works.
Cooling Tower Unit (10): FRP & cladding Works.
Administration Building: External finishing works.
Hypochlorite: Mechanical erection works.
Fire Station Building: Plastering works. e
Dormitory Building: External finishing works.
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
B 4.
Intern Siemens
Payment Report
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Site Preparation Agreement for Burullus Combined Cycle Power Project - 4800 MW
Payment Report August 9, 2017 Invoice #
Total Amount (EURO)
Total Amount (EGP)
Amount Due (EURO)
Amount Duw (EGP)
Invoice Submission Date
Payment Due Date
Actual Payment Date
Amount Received Exchange Rate Used EURO
EGP
Adv. 1
N.A.
9,372,486.75
09-Aug-15
27-Aug-15
26-Aug-15
80,447,802.77
Adv. 2
N.A.
3,124,162.25
10-Sep-15
04-Oct-15
30-Sep-15
26,996,198.42
Invoice # 1 (Works up to Sep 30, 2015)
4,035,267.59
2,824,687.31
27-Oct-15
16-Nov-15
23-Nov-15
25,322,756.79
Invoice # 2 (Works up to Nov 15, 2015)
7,911,010.26
5,537,707.18
03-Dec-15
23-Dec-15
21-Dec-15
45,077,490.22
6-Jan-16 Partial Payment
16,358,274.77
13-Jan-16
44,850,481.77
Invoice # 3 (Works up to Dec 15, 2015)
10,350,505.90
7,245,354.13
24-Dec-15
13-Jan-16
13,802,315.52
9,661,620.86
21-Jan-16
10-Feb-16
7-Feb-16
81,351,351.12
Invoice # 5 (Works up to Feb 15, 2016)
19,215,086.21
13,450,560.35
03-May-16
23-May-16
15-May-16
136,375,231.36
23-Aug-26
49,239,086.53
22,000,820.99
19-May-16
08-Jun-16
24,151,538.84
166,630,387.96 Invoice # 7 (Works for April and May, up to May 15, 2016)
53,875,462.52
48,487,916.27
13-Jun-16
04-Jul-16
23,406,913.66
21-Jun-16
13-Jul-16
Invoice # 9 (Works up to July 15, 2016)
14,878,657.95
13,390,792.16
18-Jul-16
10-Aug-16
144,291,736.93
Invoice # 10 (Works up to Aug 15, 2016)
15,111,968.76
13,600,771.88
21-Aug-16
08-Sep-16
150,105,675.69
-
-
20-Jun-17
10-Jul-17
OC Estimated Contract Price (Payable in EGP) Final Contract Price
8.1401
8.4201 10.1390
9.8119
9.8645 26,007,681.84
Total
8.9648
531,454,500.03
Invoice # 8 (Works up to June 15, 2016)
Invoice # 11 (Close-out)
8.6411
8.4481
Invoice # 4 (Works up to Jan 15, 2016)
Invoice # 6 (Works up to March 15, 2016)
8.5834
189,339,495.39
62,483,245.00 2,000,000,000.00
187,880,587.34
187,880,587.34
187,880,587.34
187,880,587.34
01-Dec-16
256,734,831.28
-
EURO EGP
1,755,235,805.64
9.8715 9.6979 9.9329
EPC Contract of Burullus Combined Cycle Power Project - 4800 MW
Payment Report August 9, 2017
Invoice #
Amount (EURO)
Amount Due (EURO)
Amount (EURO Payable in EGP)
Amount Due (EURO Payable in EGP)
Amount Rceived Invoice Date
Payment Due Date
Actual Payment Date Actual Payment Date (EGP Portion) (Euro Portion)
Exchange Rate Used EURO
EGP
Adv. Installment # 1
59,025,000.00
24-Aug-15
31-Aug-15
27-Aug-15
524,212,410.00
8.8812
Adv. Installment # 2
59,025,000.00
02-Sep-15
08-Sep-15
08-Sep-15
513,138,320.00
8.6936
108,868,571.52
03-May-16
23-May-16
22-May-16
1,085,865,639.19
23-Jun-16
181,637,902.50
02-Jun-16
22-Jun-16 20-Jul-16
265,627,422.94
1-Sep-16
353,143,505.00
27-Sep-16
15,779,485.00
Invoice # 1 (Works up to March 31, 2016) Invoice # 2 (Works up to May 31, 2016) Invoice # 3 (Works up to Jun 30, 2016) Invoice # 4 (Works up to July 31, 2016)
10,897,799.60
-
31,457,710.51
24,377,364.30
9,263,129.66
-
27,428,493.74
21,084,269.92
128,080,672.38
53,614,005.11
43,130,999.76
27,634,072.32
45,571,904.34
35,971,910.03
23,125,451.20
13-Jul-16
25-Aug-16
03-Aug-16
9.9741
9.8145
21-Sep-16 30-Sep-16
30-Jan-17
130,483,161.26
9.8172
9.8969
213,090,277.78
Invoice # 5 (Works up to August 31, 2016)
13,896,164.01
12,147,849.05
22,564,882.05
18,844,040.11
22-Sep-16
20-Oct-16
20-Oct-16
185,689,171.00
9.8540
Invoice # 6 (Works up to Sep 30, 2016)
24,479,980.29
21,114,645.10
26,118,724.60
21,894,254.06
09-Nov-16
29-Nov-16
29-Nov-16
410,481,928.00
18.7484
Invoice # 7 (Works up to Nov 30, 2016)
21,601,857.33
18,556,741.23
15,541,836.50
13,015,398.52
05-Dec-16
25 dec 216
29-Dec-16
246,001,140.10
18.9008
Invoice # 8 (Works up to Dec 31, 2016)
Partial Payment
175,334,900.31
24,138,658.21
20,888,032.53
03-Jan-17
23-Jan-17 18-Mar-17
136,894,422.72
19,172,069.45
15,926,085.98
19.6049
18-Mar-17 Invoice # 9 (Works up to Jan 31, 2017)
16,783,236.48
14,414,411.74
13,425,063.30
11,555,040.15
9,833,400.20
8,503,760.94
18,900,415.25
15,916,692.23
07-Feb-16
27-Feb-17
20-Apr-17
09-Mar-17
29-Mar-17
7-Jun-17
27-Apr-17
17-May-17
28-Feb-17
14,414,411.74
63,105,577.28 Partial Payment of EGP 200,000,000.00 portion at an exchange rate of 20.121 57,154,187.08
30-Mar-17
11,555,040.15
112,931,639.57
30-May-17
8,503,760.94
7-Jun-17 Invoice # 10 (Works up to Feb 28, 2017) Invoice # 11 (Works up to Mar 31, 2017)
7,293,613.74
6,055,835.33
7-Jun-17 4,577,975.95
3,745,908.79
29,914,173.35
3-Aug-17
Invoice # 12 (Works up to April 30, 2017)
7,114,979.21
Invoice # 13 (Works up to May 31, 2017)
5,526,367.72
4,940,273.46
31,643,648.61
26,654,240.42
31-May-17
20-Jun-17
Invoice # 14 (Works up to June 30, 2017)
14,831,071.61
13,351,699.01
17,980,375.19
14,538,030.77
06-Jul-17
26-Jul-17
Invoice # 15 (Works up to July 31, 2017)
5,806,814.97
5,224,757.04
4,124,005.67
3,216,440.50
06-Aug-17
24-Aug-17
6,291,831.99
16,936,526.34
14,151,947.73
09-May-17
437,313,822.92
OC Share
787,000,000.00
EURO
OC Portion Payable in EURO
250,000,000.00
EURO
OC Portion Payable in EGP
537,000,000.00
EURO
19.6081 43,535,980.79
29-May-17 6-Aug-17
224,170,467.74
18.6484
277,505,543.04
19.6090
378,958,476.17
20.2098
11,232,105.45
Partial Payment
176,188,479.54
5,470,002,101.82
Report No.:
E-BUR/2017/PR0023
Protection class:
Restricted
B 5.
Intern Siemens
Shipments Status
Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.
Burullus Combined Cycle Power Project ‐ Purchase Orders Log SN
PO Date
Type
Dept
F/L
E/M/C
Year
Local Supplier
Foreign Supplier
Item Description
Origin
Delivery Date
Air/Sea
1
10/Aug/15 PO
TPD
L
E
2015 3-Brothers
Lighting Fixtures
Egypt
2
13/Jul/15 PO
TPD
L
E
2015 Global Integrated Systems (GIS)
Fire Alarm System
Far East Inland
Inland
31/Aug/15 10/Aug/15
3
31/Aug/15 PO
TPD
L
E
2015 Grand International
Wiring Devices
France
21/Sep/15
4
15/Jul/15 PO
TPD
L
E
2015 Global Integrated Systems (GIS)
Fire Alarm System
Far East Inland
12/Aug/15
5
22/Jul/15 PO
TPD
L
E
2015 Grand International
Wiring Devices
France
05/Aug/15
6
29/Jul/15 PO
TPD
L
E
2015 Sega-M
LV Panel Boards
Egypt
Inland
11/Oct/15
7
22/Jul/15 PO
TPD
L
E
2015 3-Brothers
Lighting Fixtures
Egypt
Inland
12/Aug/15
8
01/Sep/15 SC
TPD
L
C
2015 E. Mak
Swimming Pool
Egypt
-
31/Oct/15
9
05/Oct/15 SC
TPD
L
E
2015 Otak Trading & Contracting
Lightning Protection and BondinEgypt
-
02/Nov/15 03/Dec/15
Inland
Inland
10
04/Oct/15 SC
TPD
L
C
2015 Sportica AlWadi Spoarts and Leisure Solutions
Sports Playgrounds
Egypt
-
11
30/Aug/15 PO
TPD
L
C
2015 Harmouch
Cement Tiles
Egypt
-
20/Sep/15
12
30/Aug/15 PO
TPD
L
C
2015 Al Mazen
Athletic Equipment
Egypt
-
06/Sep/15
13
13/Sep/15 PO
TPD
L
E
2015 Sega-M
LV Panel Boards
Egypt
-
12/Nov/15
14
16/Dec/15 PO
TPD
L
C
2015 Future
Office Furniture
Egypt
Inland
23/Dec/15
15
15/Sep/15 PO
TPD
L
C
2015 Future
Office Furniture
Egypt
Inland
22/Sep/15
16
10/Sep/15 PO
TPD
L
E
2015 ElSewedy Electrical Equipment & Cables Company
Lighting Fixtures
Egypt
Inland
05/Nov/15
17
12/Mar/17 SC
TPD
L
C
2015 Gardenia
Landscape
Egypt
-
18
17/Sep/15 PO
TPD
L
E
2015 Sega-M
LV Panel Boards
Egypt
Inland
16/Nov/15
19
01/Aug/17 SC
TPD
L
C
2015 Alutec
Aluminum Works
Egypt
-
01/Aug/17
20 16/Nov/15 PO
TPD
L
C
2015 Al Ansar El Dawlia
Commercial Kitchen Hoods
Egypt
Inland
14/Feb/16
21
13/Oct/15 PO
TPD
L
C
2015 Ceramica Cleopatra
Ceramic and Porclain Tiles
Egypt
Inland
03/Nov/15
22
12/Oct/15 PO
TPD
L
E
2015 Egyptian International Investment
Generators
UK
Inland
26/Oct/15
23
12/Oct/15 PO
TPD
L
E
2015 Egyptian International Motors
Generators
Inland
09/Nov/15
24
21/Oct/15 PO
TPD
L
C
2015 Dash Dash
Residential Appliances
Various
Inland
30/Dec/15
25 05/Nov/15 PO
TPD
L
E
2015 GIS-Global Integrated System
Fire Alarm System
USA
Inland
12/Nov/15
26
13/Oct/15 PO
TPD
L
C
2015 Aldorado
Inland
03/Nov/15
27
15/Oct/15 PO
OPE
F
C
2015
Safet
Bolts and Shear Stud
Germany Sea
20/Oct/15
28
15/Oct/15 PO
OPE
F
C
2015
Safet
Steel Rebar
Italy
Sea
15/Nov/15
29
Italpannelli SRL
Ceramic Tiles
16/Oct/16 PO
TPD
F
C
2015
Sandwich Panel
Italy
Sea
13/Nov/16
30 19/Nov/15 PO
TPD
L
C
2015 Dash Dash
Equipment for the Camp
USA
Inland
03/Dec/15
31
28/Oct/15 PO
TPD
L
E
2015 Cable Net Egypt
MATV System
Various
Inland
09/Dec/15
32 09/Nov/15 PO
OPE
F
C
2015
Bending Machine
Italy
Air
23/Nov/15
33 24/May/17 SC
TPD
L
C
2015 A-Build Egypt for Contracting
Waterproofing and Thermal Insulation
-
24/May/17
34 08/Nov/15 PO
TPD
L
E
2015 Sega-M
LV Panel Boards
Egypt
Inland
08/Dec/15
35 16/Nov/15 PO
TPD
L
C
2015 MOHM
Lockers and Benches
Egypt
Inland
30/Nov/15
36 15/Nov/16 PO
TPD
L
C
2015 Bashayer
Kitchenware
Egypt
Inland
27/Dec/16
37
18/Jan/16 PO
TPD
L
C
2015 Firoz
Residential Appliances
Egypt/ItalyInland
17/Feb/16
38 29/Nov/15 PO
TPD
L
E
2015 3-Brothers
Lighting Fixtures
Egypt
Inland
13/Dec/15
39 29/Nov/15 PO
TPD
L
C
2015 Dash Dash
Kitchenware
Egypt
Inland
10/Jan/16
40
01/Dec/15 PO
TPD
L
C
2015 Medzone
First Aid clinic equipment
China/ItalyInland
30/Jan/16
41
02/Dec/15 PO
TPD
L
C
2015 Medal Egypt
First Aid clinic equipment
Various
01/Mar/16
42
Global Sourcing Company
Inland
01/Aug/16 SC
TPD
L
C
2015 Al-Barakah
Suspended Ceiling
SC
01/Aug/16
43 23/Nov/15 SC
TPD
L
E
2015 Otak Trading & Contracting
Lightning Protection and Bonding System SC
07/Dec/15
44 09/Nov/15 PO
PUR
F
E
2015
Techno Gulf
Cable Terminations and Lugs
Italy
Sea
14/Dec/15
45
10/Jan/16 PO
PUR
F
C
2015
Kimetal SRL (Sigma)
Plates
Italy
Sea
15/Dec/15
46
14/Dec/15 PO
PUR
F
C
2015
Umran Celik Boru Sanayii
Pipes
Turkey
Sea
04/Dec/15
47 24/Nov/15 PO
PUR
F
C
2015
Sideram SRL
Pipes
Italy
Sea
10/Dec/15
48
01/Dec/15 PO
TPD
L
C
2015 Dash Dash
Toilet Accessories
Egypt
Inland
22/Dec/15
49 24/Nov/15 PO
OPE
L
E
2015 Electro Technique
Temporary Site Panels
Egypt
Inland
52
06/Jan/16 PO
TPD
F
C
2016
Polyglass SPA
Waterproof Membrane
Italy
Sea
07/Feb/16
53
19/Jan/16 PO
TPD
F
E
2015
Italian Cable Company
Earthing Cables
Italy
Sea
01/Mar/16
54
07/Dec/15 PO
OPE
F
C
2015
Baltic Control
Steel Rebar Inspection
Italy
-
55
10/Dec/15 PO
TPD
L
E
2015 Grand International
Wiring Devices
Inland
56
20/Jul/17 SC
TPD
L
C
2015 France Metal
Steel Doors
SC
57
10/Dec/15 PO
TPD
L
C
2015 Medzone
Healthcare Furniture
59
13/Dec/15 SC
TPD
L
C
2015 A-Build Egypt for Contracting
Epoxy Flooring
60
16/Dec/15 PO
TPD
F
C
2015
61
20/Dec/15 PO
TPD
L
C
62
15/Dec/15 PO
TPD
L
E
63
15/Dec/15 PO
TPD
L
E
ISEA
UK
Inland
17/Dec/15
17/Dec/15
SC
13/Dec/15
Sea
16/Dec/15
Roll up Doors
Italy
2015 Dash Dash
Residential Appliances
Italy/ChinaInland
2015 Grand International
Wiring Devices
Various
Inland
05/Jan/16
2015 Sega-M
LV Panel Boards
Egypt
Inland
22/Dec/15
27/Dec/15
64
18/Apr/17 PO
TPD
L
E
2015 Dtec
Data communication Network S Egypt
Inland
27/Jun/17
65
11/Jan/16 PO
TPD
L
E
2015 Smart Group
LV Panel Boards
Inland
21/Jan/16
66
25/Dec/15
Egypt
29/Dec/15 PO
PUR
F
C
2015
Kimetal SRL (Sigma)
Steel Sections
Italy
Sea
67 26/Nov/15 PO
PUR
F
C
2015
Sino Alliance
Safety Shoes
China
Sea
05/Jan/16
69
08/Dec/15 PO
PUR
F
E
2015
Economic Electric Company FEMI
Cable Trays
Italy
Sea
02/Feb/16
70
06/Dec/15 PO
PUR
F
C
2015
Tuxor
Steel Sections
Italy
Sea
71
13/Dec/15 PO
PUR
F
C
2015
Kimetal SRL (Sigma)
STG Plates
Italy
Sea
31/Jan/16
72
14/Dec/15 PO
PUR
F
C
2015
Tata International Metals UK
STG Steel Sections
UK
Sea
31/Dec/15
73
20/Dec/15 PO
TPD
L
C
2015 Harmouch
Terazzo Tiles
Egypt
Inland
10/Jan/16
Page 1 of 9
Burullus Combined Cycle Power Project ‐ Purchase Orders Log SN
PO Date
Type
Dept
F/L
E/M/C
Year
Local Supplier
74
17/Dec/15 PO
TPD
F
M
2015
75
28/Aug/16 PO
TPD
L
E
2015 Anzma-Tech
76
25/Feb/16 PO
OPE
F
M
2016
77
29/Dec/15 PO
TPD
L
E
2015 Al Masria for Electrical Industries & Works
79
24/Dec/15 PO
OPE
F
E
2015
80
24/Dec/15 PO
OPE
F
C
81
29/Jun/16 PO
TPD
F
82
21/Jan/16 PO
TPD
F
83
27/Dec/15 PO
TPD
84
22/Dec/15 PO
85
22/Dec/15 PO
86
30/Dec/15 PO
87
20/Dec/15 PO
88
Foreign Supplier
Item Description
Origin
Delivery Date
Air/Sea
GH Italia Cranes and Components
Overhead Cranes for Steam Tu Spain/ItalySea Access Control System & TurnsVarious
Inland
04/Sep/16
BONAR
Vertical Drains
Sea
24/Mar/16
Explosion Proof Wiring Devices Italy
Inland
05/Jan/16
Techno Gulf/Helukabel
Wires
Italy
Sea
28/Jan/16
2015
Global Sourcing Company
Bolts, Washers and Nuts
Italy
Sea
25/Jan/16
E
2015
Disano Illuminazione
Lighting Fixtures
Italy
Air
18/Jan/16
E
2015
SBP Spa a Socio Unico
Lighting Fixtures
Italy
Air
25/Jan/16
F
E
2015
Fosnova Gruppo Disano
Lighting Fixtures
Italy
Air
25/Jan/16
PUR
F
E
2015
Safet
MV Power Cables
Italy
Sea
01/Mar/16
PUR
F
E
2015
Economic Electric Company FEMI
Cable Trays
Italy
Sea
16/Feb/16
TPD
L
E
2015 Elsewedy Electrical Equipment & Cables Company
Lighting Fixtures
Egypt
Inland
10/Feb/16
PUR
F
E
2015
Techno Gulf/Sitie
Fixation Accessories
Italy
Sea
31/Jan/16
22/Dec/15 PO
PUR
F
E
2015
La Tiveneta Cavi
LV Power Cables
Italy
Sea
02/Feb/16
89
29/Dec/15 PO
TPD
L
C
2015 Woodek
Office Furniture
Egypt
Inland
28/Jan/16
90
30/Dec/15 PO
TPD
L
E
2015 Grand International
Wiring Devices
Various
Inland
27/Jan/16
91
31/Dec/15 PO
OPE
L
C
2015 Proactive
Raised Floor & Aluminum SkirtinChina
SC
07/Jan/16
92
31/Dec/15 PO
OPE
L
E
2015 Techno Gulf
CAT 6 Data Cable
Inland
03/Jan/16
93
12/Jan/16 PO
TPD
L
C
2016 Future Office Furniture
Office Furniture
Egypt
Inland
19/Jan/16
94
03/Jan/16 PO
TPD
L
E
2016 GILA (Al Tawakol Electrical Co)
LV Panel Boards
Egypt
Inland
17/Jan/16
Various
EU
Italy
95
19/Apr/16 PO
TPD
L
E
2016 Grand International
Wiring Devices
Inland
17/May/16
97
05/Jan/16 PO
OPE
L
E
2016 Techno Gulf
CAT 6 Data Cable Accessories Italy
Inland
12/Jan/16
98
17/Jan/16 PO
TPD
L
E
2016 Grand International
Wiring Devices
Inland
31/Jan/16
99
05/Jan/16 PO
TPD
L
E
2016 Sega-M
LV Panel Boards
Egypt
Inland
12/Jan/16
100
10/Jan/16 PO
TPD
L
E
2016 Grand International
Wiring Devices
Various
Inland
21/Feb/16
101
11/Jan/16 PO
TPD
L
C
2016 Raytex
Accommodation Blinder TextilesEgypt
Inland
12/Jan/16
102
17/Jan/16 PO
TPD
L
C
2016 Jotun
Epoxy Coatings for Internal steeEgypt
Inland
22/Jan/16
103
12/Jan/16 PO
TPD
L
E
2016 Debbas
Lighting Fixtures
Inland
15/Jan/16
104
08/Feb/16 SC
TPD
L
M
2015 Semco
HVAC System
SC
105
19/Jan/16 PO
TPD
L
E
2016 Cable Net Egypt
MATV - Master Antenna TV SysChina
Inland
106 29/May/16 PO
TPD
L
E
2016 Anzma-Tech
Access Control System & TurnsFrance
Inland
12/Jun/16
107
12/Jan/16 PO
TPD
L
C
2016 Woodek
Office Furniture
Inland
21/Feb/16
108
27/Jun/17 SC
TPD
L
C
2016 Al-Barakah
Suspended Ceiling
Egypt
SC
109
13/Jan/16 PO
OPE
L
E
2016 International Consultant Engineers ICE
Cathodic Protection
Egypt
Inland
110
18/Jan/16 PO
TPD
L
E
2016 Al Masria for Electrical Industries & Works
Lighting Fixtures (Explosion ProItaly
Inland
29/Feb/16
111
21/Jan/16 PO
TPD
L
E
2016 Smart Group
LV Switchgear
Egypt
Inland
11/Feb/16
112
31/Jan/16 PO
TPD
F
E
2016
Fosnova Gruppo Disano
Lighting Fixtures
Italy
Air
113
17/Jan/16 PO
OPE
F
C
2016
Baltic Control
Pipes Inspection
Italy
-
114
08/Feb/17 SC
TPD
L
C
2016 A-Build Egypt for Contracting
Epoxy Flooring
SC
115
27/Apr/16 PO
TPD
L
C
2016 Ramo Hany Maamoun Abd El Hai
Accommodation Blinder TextilesEgypt
Inland
20/Jan/16
116
14/Jan/16 PO
TPD
L
C
2016 Ahmed & Mohamed Lotfy Co.
Glazing and Mirrors
Inland
14/Jan/16
117
17/Jan/16 PO
OPE
L
C
2016 Kir Mary
Grooving Threading Machines
Inland
17/Jan/16
118
28/Jan/16 PO
TPD
L
C
2016 Dash Dash
Commercial Appliances for the Various
Inland
11/Feb/16
119
28/Jan/16 PO
TPD
L
C
2016 Contrade Egypt
Commercial Appliances for the Various
Inland
18/Feb/16
120
18/Jan/16 PO
PUR
F
C
2016
Umran Celik Boru Sanayii
Pipes
Sea
22/Feb/16
121
02/Mar/16 PO
TPD
F
E
2016
Performance In Lighting SPA
Lighting Fixtures (Control Buildi Italy
Air
28/Jan/16
122
17/Feb/16 PO
TPD
F
E
2016
Performance In Lighting SPA
Lighting Fixtures (GIS Building) Italy
Air
28/Jan/16
123
19/Jan/16 PO
TPD
L
E
2016 Egyptian International Motors
Generators
Egypt
Inland
16/Feb/16
124
21/Jan/16 PO
TPD
L
E
2016 Petrokima
LV Switchgear
Egypt
Inland
31/Mar/16
125
21/Jan/16 PO
TPD
L
E
2016 Sega-M
LV Switchgear
Egypt
Inland
28/Jan/16
126
21/Jan/16 PO
PUR
F
C
2016
Tuxor
Steel Beams and Plates
Italy
Sea
10/Feb/16
127
21/Jan/16 PO
PUR
F
M
2016
Saint Gobain PAM
128
21/Jan/16 PO
PUR
F
M
2016
Safet
01/Mar/16
129
28/Jan/16 PO
TPD
F
M
2016
Total Walther GmbH
Cast Iron Pipes and Couplings France Air Carbon Steel Teardrop Plates, Pipes, Elbows & Flat Bars Italy Sea Fire Fighting and Detection System for GIS & Control Germany Sea
24/Mar/16
130
27/Jan/16 PO
TPD
L
E
2016 Grand International
Isolating Switches
03/Feb/16
131
23/Feb/16 PO
TPD
F
M
2016
Climaveneta-SEMCO
Package Units
Italy
Sea
26/Apr/16
132
09/Mar/16 PO
TPD
F
E
2016
SBP Spa a Socio Unico
Lighting Fixtures
Italy
Sea
17/Mar/16
133
27/Jan/16 PO
OPE
F
E
2016
Safet
LV Cables
Italy
Sea
04/Feb/16
134
28/Jan/16 PO
TPD
L
C
2016 Ceramica Cleopatra
Ceramic Tiles
Egypt
Inland
04/Feb/16
135
17/Feb/16 PO
TPD
L
C
2016 Ceramica Cleopatra
Ceramic Tiles
Egypt
Inland
24/Feb/16
136
08/Feb/16 PO
TPD
L
E
2016 Al Masria for Electrical Industries & Works
Explosion Proof Wiring Devices Italy
Inland
21/Mar/16
137
21/Jan/16 PO
TPD
F
E
2016
Lighting Fixtures (Control Buildi Italy
Sea
25/Feb/16
138
31/Jan/16 PO
TPD
L
E
2016 Sega-M
LV Panel Boards
Egypt
Inland
07/Feb/16
139
31/Jan/16 PO
TPD
L
C
2016 Mohm
Lockers for the Camp
Egypt
Inland
21/Feb/16
140
03/Feb/16 PO
TPD
L
E
2016 Grand International
Wiring Devices
France
Inland
10/Feb/16
141
31/Dec/15 PO
PUR
F
C
2015
Cast Iron Pipes & Couplings
Italy
Sea
18/Jan/16
142
03/Feb/16 PO
TPD
L
C
2016 Unilex Sign Systems
Signage for camp
Egypt
Inland
08/Feb/16
Disano Illuminazione
Sideram SRL
Italy
Egypt
Egypt
Turkey
France
Inland
143
01/Feb/16 PO
PUR
F
E
2016
Techno Gulf/Cembre
Power Blocks Auxiliary ErectionItaly
Sea
144
01/Feb/16 PO
PUR
F
C
2016
Safet
Carbon Steel Teardrop Plates &Italy
Sea
Page 2 of 9
26/Jan/16
10/Feb/16
25/Jan/16 08/Feb/17
31/Jan/16
28/Mar/16 15-Feb 15-30-Mar
Burullus Combined Cycle Power Project ‐ Purchase Orders Log Type
Dept
F/L
E/M/C
Year
Local Supplier
Foreign Supplier
Item Description
Origin
Delivery Date
SN
PO Date
145
03/Feb/16 PO
PUR
F
E
2016
Safet
Cable Terminations and Joints Italy
Air
24/Feb/16
146
02/Feb/16 PO
PUR
F
C
2016
Tuxor
Steel Beams and Plates GCB
Italy
Sea
20/Feb/16
147
04/Feb/16 PO
OPE
F
M
2016
Seven Seas s.a.s - Astico
Fire Fighting System
USA/Pola Sea
14/Apr/16
148
15/Mar/16 SC
TPD
L
C
2016 Xervon Egypt
149
30/Jul/17 PO
TPD
F
C
2017
Protecta
Epoxy Coating
USA/UAE Inland
10/Sep/17
150
10/Mar/16 PO
TPD
F
E
2016
Italian Cable Company
Earthing Cables
Italy
Sea
16/Mar/16
151
07/Feb/16 PO
TPD
L
E
2016 Sega-M
LV Panel Boards
Egypt
Inland
14/Feb/16
152
20/Mar/17 SC
TPD
L
M
2016 Misr for Engineering Works
Cranes
153
08/Feb/16 PO
OPE
L
M
2016 International Consultant Engineers ICE
Cathodic Protection
Egypt
Inland
22/Feb/16
154
28/Feb/16 SC
TPD
L
M
2016 AlEtribi
Cranes
Egypt
SC
22/May/16
155
09/Feb/16 PO
OPE
F
E
2016
I & C Cables
Germany Sea
156
11/Feb/16 PO
TPD
L
E
2016 Dtec
158
11/Feb/16 PO
OPE
L
C
2016 Arcosteel
Steel Round Bars
Egypt
Inland
159
11/Feb/16 PO
PUR
F
E
2016
Safet
MV Power Cables
Italy
Sea
21/Apr/16
160
11/Feb/16 PO
PUR
F
C
2016
Kimetal SRL (Sigma)
Steel Beams and Plates
Italy
Sea
10/Apr/16
161
16/Feb/16 PO
TPD
L
E
2016 Delta Egypt Lighting
Lighting Fixtures
Egypt
Inland
12/Apr/16
162
16/Feb/16 PO
TPD
F
E
2016
Safet
Lighting Fixtures
Italy
Sea
22/Mar/16
164
15/Feb/16 PO
OPE
L
M
2016 International Consultant Engineers ICE
Cathodic Protection
Egypt
Inland
165
25/Feb/16 PO
TPD
L
E
2016 Digital Company
Audio Visual System
Egypt
Inland
166
06/Apr/16 SC
TPD
L
M
2016 Metito
Water Treatment System
Egypt
SC
167
17/Feb/16 PO
OPE
F
M
2016
Hydraulic Test Pump
USA
Air
16/Mar/16
168
06/Mar/16 PO
TPD
L
E
2016 Grand International
Wiring Devices
France
Inland
15/May/16
169
28/Feb/16 PO
TPD
F
M
2016
Climaveneta-SEMCO
Package Units
Italy
Sea
01/May/16
170
22/Feb/16 PO
OPE
F
E
2016
Italian Cable Company
UMB Power Cables
Italy
Sea
28/Mar/16
171
23/Feb/16 PO
OPE
F
C
2016
GBC Industrial Tools SPA
Pipe Cutting & Beveling Machin Italy
Sea
172
01/Mar/16 PO
TPD
L
E
2016 Anzma-Tech
174
28/Feb/16 PO
OPE
F
M
2016
175
04/Apr/16 PO
TPD
L
E
2016 Elsewedy Electrical Equipment & Cables Company
Epoxy Flooring
Seven Seas s.a.s
SC
Data communication Network S Egypt
STI Servizi Tecnici Industrial srl - Pevtco
Access Control System Ital Trade Services
Air/Sea
26/Apr/16
Inland
18/Feb/16
03/Mar/16
14/Mar/16
USA/EgypInland
08/Mar/16
Butt Fusion Machine for HDPE Italy
Sea
10/Apr/16
Lighting Fixtures
Egypt
Inland
03/Jun/16
Compressors Accessories, PipinEgypt
Inland
03/Aug/16
176
02/Mar/16 PO
TPD
L
M
2016 Atlas Copco Equipment Egypt
178
28/Feb/16 PO
PUR
F
E
2016
Safet
Cable Terminations and AccessGermany/ Sea
179
28/Feb/16 PO
PUR
F
C
2016
Umran Celik Boru Sanayii
Pipes
Turkey
Sea
23/Apr/16
180
02/Mar/16 PO
OPE
F
E
2016
Global Sourcing Company
Cable Support System
Italy
Sea
11/May/16
182
06/Mar/16 PO
TPD
L
E
2016 Grand International
Wiring Devices
France
Inland
03/Apr/16
183
09/Mar/16 PO
TPD
L
E
2016 Elsewedy Electrical Equipment & Cables Company
Lighting Fixtures
Egypt
Inland
13/Apr/16
185
03/Mar/16 PO
TPD
L
E
2016 Global Integrated Systems (GIS)
Fire Alarm System
Egypt
Inland
10/Mar/16
186
14/Mar/16 SC
TPD
L
M
2016 New Matco
HVAC System
187
08/Mar/16 PO
TPD
L
E
2016 Dtec
188
03/Mar/16 PO
PUR
F
C
2016
189
12/Apr/16 SC
TPD
L
C
2016 A-Build Egypt for Contracting
191
08/Mar/16 PO
TPD
L
E
2016 Global Integrated Systems (GIS)
192
09/Mar/16 PO
TPD
F
E
2016
193
09/Mar/16 PO
TPD
L
C
2016 Jotun
194
09/Mar/16 PO
TPD
F
E
2016
195
10/Mar/16 PO
TPD
L
E
2016 Grand International
196
10/Mar/16 PO
TPD
L
C
197
11/Jan/17 SC
TPD
L
198
23/Mar/16 PO
TPD
201
10/Mar/16 PO
PG
202
14/Mar/16 PO
TPD
CTA-Commerciale Tubi Acciaio
EMA Company
27/Mar/16
SC
Data communication Network S Egypt
Inland
15/Mar/16
Pipes and Fittings
Italy
Sea
21/Apr/16
Epoxy Coatings
Egypt
SC
Fire Alarm System
Egypt
15/Mar/16
Low Voltage Switchgear & Med Italy
Sea
06/Apr/16
Epoxy Coatings for external ste Egypt
Inland
14/Mar/16
Low Voltage Switchgear & Med Italy
Sea
04/May/16
Wiring Devices (Power Sockets France
Inland
05/May/16
2016 Ceramica Cleopatra
Ceramic Tiles
Egypt
Inland
13/Mar/16
C
2016 Golden Marble
Marble & Granite
Egypt
SC
F
E
2016
Italian Lighting/Linergy
Lighting Fixtures
Italy
Sea
F
M
2016
ETEA Sicurezza
Fire Protection Systems and EqItaly
Sea
05/May/16
L
E
2016 Grand International
Wiring Devices
Inland
09/May/16
EMA Company
France
04/May/16
203 15/May/16 PO
TPD
L
C
2016 Ramo Hany Maamoun Abd El Hai
Accommodation Blinder TextilesEgypt
Inland
15/May/16
205
15/Mar/16 PO
TPD
L
E
2016 Dtec
Data communication Network S Egypt
Inland
10/May/16
209
15/Mar/16 PO
OPE
F
E
2016
Global Sourcing Company
Control Cable
Italy
Sea
22/Mar/16
210
17/Mar/16 PO
OPE
F
E
2016
Italian Cable Company
LV Cables
Italy
Sea
07/Apr/16
211
20/Mar/16 PO
TPD
F
E
2016
BORRI SPA
Balance of Plant UPS System Italy
Sea
26/Jun/16
212
22/Mar/16 PO
TPD
L
E
2016 Modernlite Technology
Dimming System
China
Inland
17/May/16
215
31/Mar/16 PO
TPD
L
E
2016 Dtec
Data communication Network S Egypt
Inland
23/Jun/16
216
05/Apr/16 PO
TPD
L
C
2016 Ceramica Cleopatra
Ceramic Tiles
Egypt
Inland
218
31/Mar/16 PO
OPE
F
C
2016
Pipes Inspection
Italy
-
219
06/Apr/16 PO
TPD
L
C
2016 Ceramica Cleopatra
Ceramic Tiles
Egypt
Inland
220
04/Apr/16 PO
TPD
L
C
2016 Ceramica Cleopatra
Ceramic Tiles
Egypt
Inland
11/Apr/16
221
29/Mar/16 PO
PUR
F
C
2016
Steel Plates and Profiles
Italy
Sea
20/Apr/16
222
10/Apr/16 PO
TPD
L
C
2016 Dash Dash
Linen and Textiles
Egypt
Inland
24/Apr/16
223
12/Apr/16 PO
TPD
L
C
2016 Future Office Furniture
Office Furniture
Egypt
Inland
27/Apr/16
225
10/Apr/16 PO
TPD
L
C
2016 Harmouch
Terazzo Tiles
Egypt
Inland
01/May/16
226
18/Apr/16 PO
TPD
L
E
2016 Dtec
Data communication Network S Egypt
Inland
27/Jun/16
227
11/Apr/16 PO
TPD
L
E
2016 Grand International
Wiring Devices
France
Inland
20/Jun/16
228
07/Apr/16 PO
OPE
F
M
2016
Heat Treatment Equipment
UK
Sea
19/May/16
229
10/Apr/16 PO
OPE
L
C
2016 Proactive
Raised Floor Tiles
China
Inland
17/Apr/16
230
10/Apr/16 PO
OPE
L
C
2016 Proactive
Raised Floor Aluminum Skirting for CentraInland
17/Apr/16
Baltic Control
Safet
Stork Technical Services (RBG)
Page 3 of 9
05/Apr/16 13/Apr/16
Burullus Combined Cycle Power Project ‐ Purchase Orders Log SN
PO Date
Type
Dept
F/L
E/M/C
Year
Local Supplier
231
14/Apr/16 PO
TPD
L
E
2016 Grand International
232
06/Apr/16 PO
OPE
F
M
2016
233
17/Apr/16 PO
TPD
L
C
2016 Liveart
234
08/Sep/16 PO
TPD
F
E
2016
235
08/Jun/16 PO
TPD
L
C
2016 ElAraby Company for Engineering Industries
236
09/Jun/16 PO
TPD
L
C
2016 ALASKA
237
19/Oct/16 PO
TPD
F
M
2016
Foreign Supplier
Ital Trade Services
SIELTE SPA
Safetec
Item Description
Origin
Air/Sea
Delivery Date
Wiring Devices Special Accessories for Butt Fusion Machine for HDPE
France
Inland
Italy
Air
23/Jun/16 27/Apr/16
Metal Security Safe Box
Egypt
Inland
22/Apr/16
Paging System
Germany Sea
06/Jan/17
Televisions
Egypt
Inland
23/Jun/16
Inland
Residential Appliances
Egypt
Safety Shower
Sweden Sea
21/Nov/16
09/Jul/16
239 08/May/16 PO
TPD
L
C
2016 Liveart
Residential Furniture
Egypt
Inland
12/May/16
240
20/Apr/16 PO
TPD
L
C
2016 Dash Dash
Commercial Appliances for the Egypt
Inland
04/May/16
241
20/Apr/16 PO
TPD
L
E
2016 United Systems
Data communication Network S Egypt
Inland
27/Apr/16
242
17/Apr/16 PO
OPE
L
M
2016 International Consultant Engineers ICE
Service Water Tank Cathodic P Egypt
Inland
29/May/16
243
21/Apr/16 PO
OPE
L
E
2016 Electro Mechanical Engineering Company
Cable Trays Supporting DevicesEgypt
Inland
16/Jun/16
244
17/Apr/16 PO
PUR
F
M
2016
Sideram SRL
Cast Iron Pipes and Fittings
Italy
Sea
20/May/16
245
02/Jun/16 PO
PUR
F
M
2016
CUNADO
Pipes and Fittings
Italy
Sea
09/Jun/16
246
20/Apr/16 PO
PUR
F
M
2016
EUROTUBI
Pipes and Fittings
Italy
Sea
27/Apr/16
247
12/Jun/16 SC
TPD
L
C
2016 Alco
Aluminum Works
Egypt
248
27/Apr/16 PO
TPD
L
C
2016 Dash Dash
Commercial Appliances for the Egypt
Inland
249
26/Apr/16 PO
TPD
L
E
2016 Dtec
Data communication Network S Egypt
Inland
05/Jul/16
250
26/Apr/16 PO
TPD
L
E
2016 Tech Link
Data communication Network S Egypt
Inland
26/Apr/16
251 22/May/16 PO
TPD
L
E
2016 Tech Link
252 05/May/16 PO
PUR
F
M
2016
11/May/16
Data communication Network S Egypt
Inland
29/May/16
Sideram SRL
Pipes and Fittings
Italy
Sea
21/May/16 05/May/16
254 05/May/16 PO
PUR
F
E
2016
Techno Gulf/Helukabel
Conduits and Fittings
Italy
Inland
255
25/Apr/16 PO
PUR
F
E
2016
TK-Kabel
Cables
italy
Sea
25/Jul/16
256 16/May/16 PO
TPD
L
E
2016 Grand International
Wiring Devices
France
Inland
25/Jul/16
257 15/May/16 PO
OPE
L
E
2016 Electro Mechanical Engineering Company
Cable Trays Supporting DevicesEgypt
Inland
10/Jul/16
258 15/May/16 PO
OPE
L
E
2016 Power Solutions
Cable Trays Supporting DevicesEgypt
Inland
10/Jul/16
259 16/May/16 PO
TPD
L
E
2016 Sega-M
LV Panel Boards
Egypt
Inland
30/May/16
260
22/Jun/16
05/Jun/16 PO
OPE
F
E
2016
LV Cables
Italy
Sea
261 18/May/16 PO
TPD
L
E
2016 3-Brothers
Italian Cable Company
Lighting Fixtures
Egypt
Inland
08/Jun/16
262 23/May/16 PO
TPD
L
C
2016 Woodek
Office Furniture
Egypt
Inland
30/May/16
263 23/May/16 PO
TPD
L
C
2016 Dash Dash
Residential Appliances
Egypt
Inland
06/Jun/16
264
08/Jun/16 PO
TPD
L
C
2016 ElAraby Company for Engineering Industries
Refrigerator
Egypt
Inland
23/Jun/16
265 23/May/16 PO
TPD
L
E
2016 3-Brothers
Lighting Fixtures
Egypt
Inland
06/Jun/16
266 31/May/16 PO
TPD
L
C
2016 Dash Dash
Redidential Appliances
Various
Inland
31/May/16
267 29/May/16 PO
TPD
L
E
2016 ElSewedy (EGYLUX)
Lighting Fixtures
Egypt
Inland
12/Jun/16
268 29/May/16 PO
TPD
L
E
2016 ElSewedy (EGYPLAST)
Lighting Fixtures
Egypt
Inland
12/Jun/16
269
19/Jul/17 SC
TPD
L
C
2016 Xervon Egypt
Epoxy Coatings
Egypt
SC
270
Air Handling Units
Italy
Sea
01/Jun/16 PO
TPD
F
M
2016
271 22/May/16 PO
OPE
L
E
2016 Global Integrated Systems (GIS)
Weger Walter GmbH
272 22/May/16 PO
OPE
F
M
2016
273 29/May/16 PO
TPD
L
E
2016 Sega-M
274
01/Jun/16 PO
TPD
F
E
2016
Italian Lighting/Tecmar
275
05/Sep/16 PO
TPD
F
E
2016
276
02/Aug/16 PO
TPD
F
E
2016
277
01/Jun/16 PO
TPD
F
E
278
21/Feb/17 PO
TPD
F
C
279
01/Jun/16 PO
TPD
F
C
2016
280
09/Jun/16 PO
TPD
L
C
2016 Jotun
Epoxy Coating for External SteeEgypt
281 06/Nov/16 PO
TPD
L
E
2016 Cable Net Egypt
MATV System
Fire Resistant Cables Hamon Thermal Europe
27/Jul/16
Inland
29/May/16 12/Jun/16
Gluing Machines
EU
Sea
LV Panel Boards
Egypt
Inland
05/Jun/16
Lighting Fixtures (Gas Turbines Italy
Sea
15/May/16
Fael Luce/Delta Egypt Foreign Trading
Lighting Fixtures (Gas Turbines Italy
Sea
20/Sep/16
Fael Luce/Delta Egypt Foreign Trading
Lighting Fixtures
Italy
Sea
05/May/16
2016
Italian Lighting/Tecmar
Lighting Fixtures (Gas Turbines Italy
Sea
27/Jul/16
2016
ISEA
Roll up Doors
Italy
Sea
15/Jun/16
ISEA
Roll up Doors
Italy
Sea
15/Jun/16
Inland
14/Jun/16
Denmark/ Inland
06/Nov/16
282
03/Oct/16 PO
TPD
F
E
2016
Clampco Sistemi
Obstructions Lights
Italy
Sea
10/Oct/16
283
05/Jun/16 PO
TPD
F
E
2016
FGM Electrical Service
CCTV - Closed Camera TV
Italy
Sea
10/Jul/16
285
06/Apr/17 PO
TPD
F
M
2016
Emit Metito
Water and Waste Water TreatmEurope
Sea
287
02/Jun/16 PO
TPD
F
M
2016
Atlas Copco Italia
Packaged Air Compressor
Europe
Sea
16/Aug/16
288
27/Jun/16 PO
TPD
F
E
2016
Tesylab Company
Master Clock System
Italy
Sea
18/Jul/16
289
03/Jul/16 PO
TPD
F
E
2016
Benning Conversion Di Energia
Balance of Plant UPS System France/GeSea
20/Jul/16
290
06/Jun/16 PO
TPD
F
E
2016
Tesylab Company
Pabx
USA
06/Jul/16
291
28/Jul/16 PO
TPD
L
C
2016 Modern Design
Blinds
Egypt
292
26/Mar/17 PO
TPD
F
E
2016
ALFAQUADRI Company
Low Voltage Switchgear & Med Italy
Sea
16/Apr/17
293 30/May/16 PO
PUR
F
M
2016
ELETTROCANALI
PVC Condiuts and Fittings
Sea
06/Jun/16
294
02/Jun/16 PO
PUR
F
M
2016
Sideram SRL
Cast Iron Pipes and Fittings
EU
Sea
09/Jun/16
295
05/Jun/16 PO
PUR
F
E
2016
Seven Seas-Helukabel
Telephone Cables
EU
Sea
07/Aug/16
ISEA
Roll up Doors
Italy
Sea
08/Nov/16
Kitchenware
Egypt
Inland
Sandwich Panel
Italy
Sea
Italy
Air Inland
11/Aug/16
296
04/Oct/16 PO
TPD
F
C
2016
297
15/Jun/16 PO
TPD
L
C
2016 Dash Dash
298
02/Jun/16 PO
TPD
F
C
2016
299
13/Jul/16 PO
OPE
F
M
2016
Lincoln Electric Italia
Welding Electrodes
italy
Sea
24/Jul/16
300
31/Mar/16 PO
OPE
F
C
2016
Global Sourcing Company
Bolts, Washers and Nuts
Italy
Sea
25/Apr/16
301
20/Jun/16 PO
TPD
L
C
2016 Dash Dash
Linen and Textiles
Egypt
Inland
11/Jul/16
302
19/Jun/16 PO
TPD
L
C
2016 Dash Dash
Linen and Textiles
Egypt
Inland
10/Jul/16
303
26/Jun/16 PO
TPD
L
C
2016 Liveart
Residential Furniture
Egypt
Inland
21/Jul/16
Italpannelli SRL
Page 4 of 9
06/Jul/16 30/Jun/16
Burullus Combined Cycle Power Project ‐ Purchase Orders Log SN
PO Date
Type
Dept
F/L
E/M/C
Year
Local Supplier
Foreign Supplier
Item Description
Origin
Air/Sea
304 28/Nov/16 PO
TPD
L
E
2016 Integrity and Corrosion Experts
305
20/Oct/16 PO
PG
F
M
2016
306
28/Jul/16 PO
TPD
L
C
2016 Modern Design
307
24/Jul/16 PO
TPD
F
E
2016
Kone Italy
Elevators
308
14/Mar/16 PO
OPE
F
M
2016
Global Sourcing Company
HDPE Pipes and Fittings
309
12/Jun/16 PO
OPE
F
M
2016
Seven Seas
Water Tank Level Indicators
310
19/Jun/16 PO
OPE
F
M
2016
WIKA
Pressure Gauge
Germany Air
311
03/Jul/16 PO
OPE
F
M
2016
Global Sourcing Company
CO2 Breather
Finland
312
26/Jun/16 PO
TPD
F
M
2016
RE.CO.MA
Gas Storage Cylinders
Austria/ItaSea
30/Sep/16
313
26/Jun/16 PO
TPD
F
E
2016
ALFAQUADRI Company
LV Switchgear
Italy
25/Aug/16
314
14/Jul/16 PO
TPD
F
E
2016
ENDRESS + HAUSER
Control Valves
Germany Air
315
04/Jul/16 PO
TPD
F
M
2016
Pompe Garbarino
Horizontal Centrifugal Water PuItaly
Sea
25/Sep/16
316
03/Jul/16 PO
TPD
F
E
2016
Parcol International
Control Valves
Air
15/Sep/16
317
11/Jul/16 PO
TPD
L
C
2016 Jotun
Epoxy Coating for External SteeEgypt
Inland
16/Jul/16
318
25/Jul/16 PO
TPD
F
M
2016
Italian Petrochemical Manufacturers
Hydrogen Generating System
Sea/Air
06/Feb/17
319
03/Jul/16 PO
OPE
F
M
2016
Seven Seas
Fire Valves
320
03/Jul/16 PO
OPE
F
M
2016
Global Sourcing Company
Drain Valves
321
04/Oct/16 PO
OPE
F
M
2016
WIDOS
HDPE Welding Machine
322
03/Jul/16 PO
OPE
F
M
2016
ETEA Sicurezza
Fire Extinguishers for Power BloItaly
Sea
11/Sep/16
323
04/Jul/16 PO
PUR
F
M
2016
Sideram SRL
Pipes and Fittings
Italy
Sea
20/Jul/16
324
23/Jun/16 PO
PUR
F
E
2016
Sideram SRL
Earth Bars
Italy
Air
03/Jul/16
325
11/Jul/16 PO
PUR
F
E
2016
Tratos CAVI
Permanent Fence Cables
Italy
Sea
26/Sep/16
326
11/Jul/16 PO
PUR
F
E
2016
Italian Cable Company
STG Cables
Italy
Sea
01/Aug/16
327
14/Jul/16 PO
TPD
L
E
2016 Grand International
Wiring Devices
France
Inland
25/Aug/16
328
05/Oct/16 PO
TPD
F
C
2016
Sandwich Panel
Italy
Delivered X
329
27/Jul/16 PO
TPD
F
M
2016
Seven Seas
Submersible Pumps
Italy
Sea
28/Sep/16
330
12/Jul/16 PO
PUR
F
E
2016
TK-Kabel
I&C Cables
Italy
Sea
23/Aug/16
331
13/Jul/16 PO
PUR
F
M
2016
EUROTUBI
Pipes and Fittings
Italy
Sea
20/Jul/16
332
14/Jul/16 PO
PUR
F
C
2016
Tuxor
Steel Beams and Plates
Italy
Sea
24/Jul/16
333
18/Jul/16 PO
OPE
F
C
2016
Global Sourcing Company
Bolts, Washers and Nuts
KSA
Sea
15/Aug/16
334
19/Jul/16 PO
TPD
F
E
2016
Italian Lighting/Tecmar
Lighting Fixtures
Italy
Sea
23/Aug/16
335
08/Sep/16 SC
TPD
L
E
2016 Kone Egypt
336
27/Jul/16 PO
TPD
F
E
2016
337
28/Jul/16 PO
TPD
L
C
2016 Future Office Furniture
338
28/Jul/16 PO
OPE
F
M
2016
339
28/Dec/16 PO
TPD
F
E
2016
340
04/Jul/16 PO
PUR
F
C
2016
341
31/Jul/16 PO
OPE
F
M
2016
Ital Trade Services
342
30/Jul/16 PO
OPE
F
M
2016
343
27/Jul/16 PO
PUR
F
E
2016
344
27/Jul/16 PO
PUR
F
M
2016
345
28/Jul/16 PO
PUR
F
M
2016
SANCO
Cathodic Protection
Weatern EInland
Cotainerized Fire Pump
italy
Delivery Date
Accommodation Blinder TextilesEgypt
Italpannelli SRL
05/Dec/16 31/Jul/16
Inland
18/Aug/16
Italy
Sea
06/Dec/16
UAE
Sea
30/Mar/16
Air
26/Jun/16
Italy
Air
Sea
31/Jul/16 13/Sep/16
23/Aug/16
Poland/DeSea
31/Jul/16
Sea
07/Aug/16
Germany Sea
09/Nov/16
Elevators Works Tesylab Company
Sea
SC
Pabx
USA
Air
Office Furniture
Egypt
Inland
12/Aug/16
Butt Fusion Machine for HDPE Italy
Sea
21/Aug/16
EMA Company
Low Voltage Switchgear & Med Italy
Sea
25/Sep/16
Tata International Metals UK
Spirally Welded SAW Steel PipeTurkey
Sea
31/Jul/16
Special Reductions PT200
Italy
Air
07/Aug/16
Global Sourcing Company
Bending Machine
Italy
Air
05/Aug/16
Italian Cable Company
Sea
07/Sep/16
CTA-Commerciale Tubi Acciaio
LV Wires Italy Female Hose Connection with Hose Adaptors Italy
Air
10/Aug/16
EUROTUBI
Pipes and Fittings
Sea
11/Aug/16
Ital Trade Services
Italy
26/Aug/16
346
26/Sep/16 PO
TPD
L
E
2016 Anzma-Tech
347
04/Jul/16 PO
PUR
F
C
2016
Tata International Metals UK
Spirally Welded SAW Steel PipeTurkey
Sea
31/Jul/16
348
05/Oct/16 PO
TPD
F
C
2016
Italpannelli SRL
Sandwich Panel
Italy
Sea
12/Oct/16
349
07/Sep/16 PO
OPE
F
M
2016
ETV-European Technology Valves
Fuel Gas Valve
Italy
Air
22/Sep/16
350
01/Aug/16 PO
PUR
F
M
2016
Sideram SRL
Pipes and Fittings
Italy
Sea
29/Aug/16
351
11/Aug/16 PO
OPE
F
M
2016
Global Sourcing Company
HDPE SDR9 (14 bar) FM 200 FItaly
Sea
15/Sep/16
352
11/Oct/16 PO
TPD
L
E
2016 Universe
Data Network Accessories
Egypt
Inland
18/Oct/16
353
08/Sep/16 PO
TPD
L
C
2016 Future Office Furniture
Office Furniture
Egypt
Inland
15/Sep/16
354
14/Aug/16 PO
OPE
L
E
2016 Al Bashayer Foundation Co
Communications Voice TelephoEgypt
Inland
14/Aug/16
355
12/Aug/16 PO
OPE
F
M
2016
Tuxor
Special Supports for Fuel Gas SUSA
Air
09/Sep/16
356
12/Aug/16 PO
OPE
F
M
2016
CVB Valves/Parcol
Valves
Italy
Air
27/Sep/16
357
18/Aug/16 PO
TPD
F
E
2016
WIKA
Pressure Gauges
Italy
358
21/Aug/16 PO
TPD
L
E
2016 Dtec
359
21/Aug/16 PO
TPD
F
M
2016
360
11/Aug/16 PO
PUR
F
M
2016
361
30/Aug/16 PO
TPD
L
E
2016 Grand International
362
01/Sep/16 PO
TPD
F
E
2016
363
01/Sep/16 PO
TPD
F
E
2016
ENDRESS + HAUSER
364
08/Sep/16 PO
TPD
F
E
2016
Italian Lighting/Linergy
365
07/Sep/16 PO
OPE
F
M
2016
GEF SALES-PEVTCO
366
29/Aug/16 PO
OPE
F
M
2016
367
01/Sep/16 PO
OPE
F
M
2016
368
07/Sep/16 PO
OPE
F
M
2016
369
07/Sep/16 PO
OPE
F
M
2016
Seven Seas
Globe Valves for Air Trap
370
06/Sep/16 PO
PUR
F
M
2016
Sideram SRL
Pipes and Fittings
371
06/Sep/16 PO
PUR
F
C
2016
Tuxor
Steel Beams
372
06/Sep/16 PO
PUR
F
E
2016
ELETTROCANALI
PVC Condiuts and Fittings
Access Control System & TurnsMalaysia Inland
24/Oct/16
Air
29/Sep/16
Data communication Network S Egypt
Inland
28/Aug/16
Greenheck Fan Corporation
Gravity Roof Ventilators
USA
Sea
16/Oct/16
Seven Seas
Hose Connections
Italy
Air
01/Sep/16
Wiring Devices
France
Inland
ENDRESS + HAUSER
Radar Level Transmitter
Germany Air
10/Nov/16
Pressure Transmitter
USA/GermAir
10/Nov/16
Lighting Fixtures
Italy
Sea
13/Oct/16
Fuel Gas Check/Ball Valve
Italy
Air
14/Sep/16
CVB Valves/Parcol
Valves
Italy
Air
16/Oct/16
Tuxor
Special Supports for Fire FightinItaly
Air
06/Oct/16
Seven Seas
Strainers
Sea
12/Oct/16
Italy
Air
21/Sep/16
Italy
Sea
04/Oct/16
Italy
Sea
13/Sep/16
Italy
Sea
13/Sep/16
Page 5 of 9
Italy
25/Oct/16
Burullus Combined Cycle Power Project ‐ Purchase Orders Log Type
Dept
F/L
E/M/C
Year
Local Supplier
Foreign Supplier
Item Description
Origin
Air/Sea
Delivery Date
SN
PO Date
373
08/Sep/16 PO
PUR
F
C
2016
Tuxor
Steel Plates
Italy
Sea
374
08/Sep/16 PO
OPE
F
M
2016
Global Sourcing Company
Cast Iron for Plumbing Works
Italy
Sea
06/Oct/16
375
08/Sep/16 PO
PUR
F
E
2016
La Tiveneta Cavi
LV Wires and Cables
Italy
Sea
03/Nov/16
15/Sep/16
376
15/Sep/16 PO
TPD
F
M
2016
Seven Seas
Sanitary Sewage Lift Station EqItaly
Sea
10/Oct/16
377
27/Sep/16 PO
TPD
F
C
2016
Polyglass SPA
Waterproof Membrane
Italy
Sea
05/Nov/16
378 10/Nov/16 PO
TPD
L
E
2016 Cairo Industrial & Petroleum Services
Instrument Tubing
Egypt
Inland
17/Nov/16
379
29/Sep/16 PO
TPD
L
E
2016 ANNCO
Low Voltage
France
Inland
10/Nov/16
380
20/Sep/16 PO
PUR
F
E
2016
Economic Electric Company FEMI
Cable Trays and Accessories
Italy
Sea
25/Oct/16
381
19/Sep/16 PO
OPE
F
M
2016
GEF SALES-PEVTCO
Siemens Valves
Italy
Sea
26/Sep/16
382
26/Sep/16 PO
TPD
L
E
2016 Grand International
Wiring Devices
France
Inland
29/Nov/16
383
27/Sep/16 PO
TPD
L
C
2016 Dash Dash
Linen and Textiles
Egypt
Inland
07/Oct/16
384
26/Sep/16 PO
TPD
F
E
2016
ALFAQUADRI Company
LV Switchgear
Italy
Sea
10/Dec/16
385
26/Dec/16 PO
TPD
F
M
2016
Tarnos Filtracion
Traveling Water Screens & Accessories
Sea
24/Jul/17
386
19/Oct/16 PO
TPD
F
M
2016
TMP-Termomeccanica Pompe
Vertical Turbine Pumps
Italy
Sea
23/Dec/16
387
04/Oct/16 PO
TPD
L
C
2016 Ceramica Cleopatra
Ceramic Tiles
Egypt
Inland
07/Oct/16
388
04/Oct/16 PO
TPD
L
C
2016 Ceramica Cleopatra Fancy
Ceramic Tiles
Egypt
Inland
389
04/Oct/16 PO
TPD
F
M
2016
Total Walther GmbH
Fire Fighting System
Germany Air
390
04/Oct/16 PO
TPD
L
E
2016 3-Brothers
Lighting Fixtures
Egypt
Inland
18/Oct/16
391
03/Oct/16 PO
PUR
F
M
2016
IRC
Carbon Steel Elbow
Italy
Air
03/Oct/16
392
03/Oct/16 PO
PUR
F
M
2016
Global Sourcing Company
Pipes and Fittings
393
04/Oct/16 PO
TPD
L
C
2016 Dash Dash
394
05/Oct/16 SC
TPD
L
E
2016 Advanced Technologies
396
20/Oct/16 PO
PUR
F
C
2016
397
10/Oct/16 PO
TPD
L
E
2016 Advanced Technologies
398
10/Oct/16 PO
TPD
L
E
2016 Advanced Technologies
400
29/Sep/16 SC
PG
F
M
2016
401
20/Sep/16 SC
PG
F
M
2016
403
30/Oct/16 PO
TPD
L
E
2016 Universe
404
28/Oct/16 PO
OPE
F
M
2016
CVB Valves/Parcol
Valves
Italy
Air
23/Dec/16
405
12/Oct/16 PO
PUR
F
M
2016
Sideram SRL
Pipes and Fittings
Italy
Sea
09/Nov/16
406
11/Oct/16 PO
PUR
F
M
2016
Ital Trade Services
Spare Parts and Metric ReductioItaly
Air
01/Nov/16
407
13/Oct/16 PO
PUR
F
E
2016
Italian Cable Company
Cables
Sea
17/Nov/16
408 15/Nov/16 PO
TPD
F
M
2016
RE.CO.MA
Gas Storage Cylinders
Austria/ItaSea
30/Mar/17
409
25/Oct/16 PO
TPD
L
E
2016 Sega-M
LV Panel Boards
Egypt
15/Nov/16
410
20/Oct/16 PO
PUR
F
C
2016
Tuxor
Steel Plates
Italy
Sea
27/Oct/16
411
26/Oct/16 PO
TPD
F
E
2016
Italian Lighting/Tecmar
Lighting Fixtures
Italy
Sea
30/Nov/16
412
Sea
08/Dec/16 21-Jan-17 05-Feb-16
Toilet Accessories
Sea Egypt/Chi Inland
04/Oct/16 18/Oct/16
24/Oct/16 18/Nov/16
Data communication Network S Egypt
SC
05/Oct/16
Expansion Joints
Air/Sea
10/Nov/16
Data Communication Network SEgypt
Inland
24/Oct/16
Data Communication Network SEgypt
Inland
24/Oct/16
AGRU
HDPE Pipes
Austria
Sea
29/Sep/16
PIPELIFE
Offshore Polyethylene Long, HigNorway
Sea
20/Sep/16
Data communication Network S Egypt
Inland
13/Nov/16
SAFET
Italy
Italy
Inland
20/Oct/16 PO
PUR
F
E
2016
Italian Cable Company
Cables
Italy
413 27/Nov/16 PO
TPD
F
E
2016
Schuch
Lighting Fixtures
Germany Sea
414
27/Oct/16 PO
TPD
L
C
2016
Modern Waterproofing
Water Proofing
Egypt
Inland
03/Nov/16
415
30/Oct/16 PO
TPD
L
E
2016 Sega-M
LV Panel Boards
Egypt
Inland
01/Nov/16
416
26/Oct/16 PO
PUR
F
M
2016
417 28/Nov/16 PO
TPD
L
E
2016 International Consultant Engineers ICE
418
25/Oct/16 PO
PUR
F
E
2016
419
26/Oct/16 PO
PUR
F
C
2016
420
Safet
Underground Cable/Pipe LocatoItaly
Air
Girard Industries Europe
FOAM PIG
Air
29/Oct/16 05/Dec/16
Cathodic Protection
Egypt
Inland
Economic Electric Company FEMI
Cable Trays
Italy
Sea
06/Dec/16
Tuxor
Steel Beams
Italy
Sea
02/Nov/16
Access Control System
Malaysia Inland
06/Dec/16 PO
TPD
L
E
2016 Anzma-Tech
422 02/Nov/16 PO
PUR
F
E
2016
423 08/Nov/16 PO
TPD
L
E
2016 Horizon For Industry
CCTV Console
Inland
26/Dec/16
424 17/Nov/16 PO
TPD
L
E
2016 Anzma-Tech
Access Control System & TurnsUSA
Inland
19/Nov/16
425 09/Nov/16 PO
OPE
F
C
2016
Global Sourcing Company
Bolts, Washers and Nuts
Sea
426 06/Nov/16 PO
TPD
F
M
2016
SANCO
Fire Fighting System for UBA, UItaly
427
Egypt
Italy
Air/Sea
09/Dec/16 23/Nov/16
21/Dec/16 15-Nov-16 01-Dec-16
12/Dec/16 PO
PUR
F
E
2016
Global Sourcing Company
Supporting Devices
Germany Sea
428 06/Nov/16 PO
PUR
F
E
2016
SITIE Impianti Industriali
Supporting Devices
Italy
Sea
05/Jan/17
429 09/Nov/16 PO
TPD
F
E
2016
Microntel
Gate Access Control
Italy/TurkeSea
07/Feb/17
430 17/Nov/16 PO
TPD
L
E
2016 Sega-M
LV Switchgear
Egypt
431 14/Nov/16 PO
OPE
F
M
2016
GEF SALES-PEVTCO
Ball Valves
432 15/Nov/16 PO
OPE
F
M
2016
RE.CO.MA
433 28/Nov/16 PO
TPD
F
M
2016
Eurocom
434 22/Nov/16 PO
TPD
F
M
2016
Seven Seas
435 20/Nov/16 PO
PUR
F
E
2016
436 20/Nov/16 PO
PUR
F
E
2016
437
09/Jan/17
Inland
01/Dec/16
Air
21/Nov/16
Argon & Hydrogen Hoses
Austria/ItaAir
25/Nov/16
Stop Logs
Italy
Sea
09/Jan/17
Hydro-Pneumatic Tanks
Italy
Sea
31/Jan/17
Italian Cable Company
Cables
Italy
Sea
01/Jan/17
TK-Kabel
Cables
Germany Sea
18/Dec/16
22/Feb/17 PO
TPD
L
C
2016 Jotun
Epoxy Coatings for external ste Egypt
Inland
22/Feb/17
438 29/Nov/16 PO
TPD
L
E
2016 Dtec
Data communication Network S Egypt
Inland
29/Nov/16
439 30/Nov/16 PO
TPD
L
E
2016 Middle East Company for Engineering
Instrument Tubing
Egypt
Inland
30/Nov/16
440 30/Nov/16 PO
TPD
L
E
2016 Universe
Data Network Accessories
Egypt
Inland
07/Dec/16
441
29/Dec/16 PO
PUR
F
M
2016
Pipes and Fittings
Italy
Sea
12/Jan/17
442 29/Nov/16 PO
TPD
L
E
2016 Anzma-Tech
Inland
06/Dec/16
Access Control System & TurnsMalaysia Inland
18/Apr/17 10-Dec-16 07-Mar-17
443
Sideram SRL
Access Control System & TurnsUSA
14/Mar/17 PO
TPD
L
E
2016 Anzma-Tech
444 29/Nov/16 PO
PUR
F
E
2016
TK-Kabel
Cables
Germany Sea
445 29/Nov/16 PO
PUR
F
M
2016
Idrosapiens
Pipe Supports
Italy
Page 6 of 9
Air
20/Dec/16
Burullus Combined Cycle Power Project ‐ Purchase Orders Log Type
Dept
F/L
E/M/C
Year
Local Supplier
Foreign Supplier
Item Description
PO Date
446
04/Dec/16 PO
TPD
L
E
2016 Otak Trading & Contracting
447
28/Feb/17 PO
TPD
F
M
2017
448
28/Dec/16 SC
TPD
L
M
2016 Semco
HVAC System
449
07/Dec/16 PO
TPD
L
E
2016 Otak Trading & Contracting
Earthing and Lightning
UK
Inland
450
13/Dec/16 PO
TPD
F
M
2016
Seven Seas
Non-Metallic Tanks
Italy
Sea
07/Mar/17
451
05/Dec/16 PO
TPD
F
M
2016
Saiver-Costruzioni Aerauliche
Air Handling Units
Italy
Sea
13/Mar/17
Earth Bars Emit Metito
Origin
UK
Chemical Laboratory Equipmen Europe
Air/Sea
Delivery Date
SN
Inland
04/Dec/16
Sea
23/May/17
Inland 21/Dec/16
452 31/May/17 PO
OPE
F
M
2016
Nuova Sguassero
Fiberglass-Reinforced Thermos Italy
Sea
30/Jun/17
453
15/Dec/16 PO
TPD
F
E
2016
Italian Lighting/Linergy
Lighting Fixtures
Sea
26/Jan/17
454
14/Dec/16 PO
PUR
F
C
2016
Lifting Safety
Camlok CLB Container Bottom UK
Air
21/Dec/16
455
20/Dec/16 PO
TPD
L
C
2016 Ceramica Cleopatra for Cement
Ceramic Tiles
Egypt
Inland
23/Dec/16
456
20/Dec/16 PO
TPD
L
C
2016 Ceramica Cleopatra (Fancy)
Ceramic Tiles
Egypt
Inland
457
20/Dec/16 PO
TPD
F
M
2016
20/Dec/16 15-May-17 30-May-17
Italy
Pompe Garbarino
Horizontal Centrifugal Water PuItaly
Sea Air
15/Jan/17
Austria/ItaAir
15/Jan/17 30-Jan-17 12-Feb-17
458
18/Dec/16 PO
OPE
F
M
2016
ETEA Sicurezza
Integration of Input Signals for FItaly
459
18/Dec/16 PO
OPE
F
M
2016
RE.CO.MA
Argon Hoses
460
18/Dec/16 PO
OPE
F
M
2016
SRI SAI RUBBER PRODUCTS PVT LTD
Rubber Compensators & Rubber Flexible Sea
461
28/Dec/16 PO
TPD
L
C
2016 Harmouch
Terazzo Tiles
Egypt
Inland
18/Jan/17
462
20/Dec/16 PO
TPD
F
E
2016
BEGHELLI
Lighting Fixtures
Italy
Sea
14/Feb/17
463
29/Dec/16 PO
TPD
F
E
2016
Tesylab Company
Active Switches
USA
Air
23/Feb/17
464
18/Dec/16 PO
PUR
F
M
2016
CTA-Commerciale Tubi Acciaio
Post Guard Pipes
Italy
Sea
28/Feb/17
465
18/Dec/16 PO
PUR
F
M
2016
CUNADO
Flanges and Fittings
Europe
Air
15/Jan/17
466
19/Dec/16 PO
OPE
F
M
2016
BONAR
Vertical Drains
Europe
Sea
16/Jan/17
467
25/Dec/16 PO
TPD
L
E
2016 Cable Net Egypt
Master Antenna TV System
China/Kor Inland
01/Jan/17
468
25/Dec/16 PO
TPD
L
E
2016 Grand International
Wiring Devices
France
Inland
27/Dec/16
469
04/Jan/17 11-Mar-17 23-Mar-17 06-Feb-17 06-Mar-17
28/Dec/16 PO
TPD
L
E
2016 3-Brothers
470 02/May/17 PO
TPD
F
E
2017
Safet (BEGHELLI)
Lighting Fixtures
Egypt
Inland
Lighting Fixtures
Czech
Sea
471
26/Dec/16 PO
OPE
F
M
2016
CVB Valves/Parcol
Valves
Italy
Air
472
26/Dec/16 PO
OPE
F
M
2016
Global Sourcing Company
Fire Pipes FM
UAE
Sea
473
02/Feb/17 PO
OPE
F
C
2017
Global Sourcing Company
Bolts, Washers and Nuts
KSA
Sea
474
02/Feb/17 PO
OPE
F
C
2017
Global Sourcing Company
Bolts, Washers and Nuts
KSA
Sea
475
04/Jan/17 PO
TPD
L
E
2017 Techno Printy
Access Control System
Malaysia Inland
476
15/Jan/17 PO
TPD
L
E
2017 Universe
477
01/Feb/17 PO
TPD
F
E
2017
478
15/Jan/17 PO
TPD
L
C
479
03/Jan/17 PO
OPE
L
C
480
15/Jan/17 PO
TPD
L
481
16/Jan/17 PO
PUR
482
17/Jan/17 PO
TPD
483
23/Jan/17 PO
484 485
23/Jan/17 25-Jan-17 14-Feb-17 26-Jan-17 02-Mar-17
Data Network Accessories
Egypt
Inland
26/Feb/17
Lighting Fixtures
Italy
Sea
08/Mar/17
2017 Future Office Furniture
Office Furniture
Egypt
Inland
22/Jan/17
2017 Proactive
Raised Floor & Aluminum SkirtinEgypt
Inland
10/Jan/17
E
2017 Grand International
Wiring Devices
France
Inland
12/Feb/17
F
C
2017
Safety Barrier
Italy
Air
28/Jan/17
L
E
2017 3-Brothers
Lighting Fixtures
Egypt
Inland
20/Jan/17
TPD
L
E
2017 I & R Egypt
Audio Video
Czech
Inland
06/Feb/17
17/Jan/17 PO
PUR
F
E
2017
Sea
21/Mar/17
22/Jan/17 PO
TPD
L
C
2017 Liveart
Residential Furniture
Egypt
Inland
29/Jan/17
486
23/Jan/17 PO
TPD
L
C
2017 Liveart
Residential Furniture
Egypt
Inland
487
01/Feb/17 PO
TPD
F
E
2017
Fael Luce/Delta Egypt Foreign Trading
Lighting Fixtures
Italy
Sea
15/Mar/17
488
13/Mar/17 PO
OPE
F
M
2017
Global Sourcing Company
Valves for Chemical Cleaning
Italy
Sea
01/May/17
489
30/Jan/17 PO
TPD
L
E
2017 Sega-M
LV Panel Boards
Egypt
Inland
06/Feb/17
490
30/Jan/17 PO
TPD
L
E
2017 Middle East Company for Engineering
Instrument Tubing
Egypt
Inland
30/Jan/17
491
30/Jan/17 PO
TPD
L
E
2017 Anzma-Tech
Access Control & Security SysteUSA
Inland
27/Feb/17
492
01/Feb/17 PO
TPD
F
E
2017
493
29/Jan/17 PO
OPE
L
E
2017 Elsewedy Electric Tools
494
12/Feb/17 PO
TPD
F
E
2017
495
06/Feb/17 PO
TPD
F
E
2017
496
05/Feb/17 PO
TPD
F
M
2017
497
11/Jul/17 PO
OPE
L
M
2017 Delta Carbon Gases
498
09/Feb/17 PO
OPE
F
M
499
14/Feb/17 PO
OPE
F
500
12/Feb/17 PO
OPE
F
501
13/Feb/17 PO
TPD
502
13/Feb/17 PO
TPD
503
16/Feb/17 PO
504 505
Italian Lighting/Tecmar
Safet
Global Sourcing Company
ENDRESS + HAUSER
Cable Ladders
Measuring Instruments
Germany Air
12/Apr/17
Electrical Lighting Lamp Discharge Hit Me Inland
29/Jan/17
ENDRESS + HAUSER
Measuring Instruments
Germany Air
23/Apr/17
ALFAQUADRI Company
LV Switchgear
Italy
Sea
07/Apr/17
DRAGFLOW S.R.L
Intake Sediment Removal SysteItaly
Sea
11/Jun/17
Gas for Gas Storage Cylinders Egypt
Inland
2017
CTA-Commerciale Tubi Acciaio
Piping, Bolts & Gaskets for Che Italy
Sea
M
2017
SpiraxSarco
Safety Valve
Italy
Air
04/Apr/17
M
2017
ETV-European Technology Valves
Fuel Gas Valve
Italy
Air
05/Mar/17
L
C
2017 Ceramica Cleopatra Fancy
Ceramic Tiles
Egypt
Inland
13/Feb/17
L
C
2017 Ceramica Cleopatra Fancy
Ceramic Tiles
Egypt
Inland
13/Feb/17
TPD
F
E
2017
Torgovity Dom Velan Limited
Explosion Proof Lighting FixtureRussia
Air
23/Mar/17
12/Feb/17 PO
OPE
F
M
2017
Global Sourcing Company
Hilti Expansion Anchors
Air
19/Feb/17
TK-Kabel
Italy
14/Jul/17 31-Mar-17 14-Apr-17
09/Feb/17 PO
PUR
F
E
2017
506 22/May/17 PO
TPD
L
E
2017 ElSewedy Electrical Equipment & Cables Company
Cables
Germany Sea
09/Mar/17
Lighting Poles
Egypt
Inland
22/May/17
507
15/Feb/17 PO
PUR
F
M
2017
508
16/Feb/17 PO
PUR
F
M
2017
Sideram SRL
Cast Iron Pipes and Fittings
Italy
Sea
08/Mar/17
Safet
Expansion Joints
Italy
Sea
509
19/Feb/17 PO
TPD
L
E
2017 Middle East Company for Engineering
24/Apr/17
Instrument Tubing
Egypt
Inland
26/Feb/17
510
23/Feb/17 SC
TPD
L
C
2017 Somie
511
19/Feb/17 PO
OPE
F
M
2017
512
19/Feb/17 PO
OPE
F
M
2017
Plastek S.r.l
CPVC Material and Tools
Italy
Sea
09/Apr/17
513
13/Mar/17 PO
TPD
F
C
2017
Italpannelli SRL
Sandwich Panel
Italy
Sea
10/Apr/17
514
09/Apr/17 PO
TPD
F
C
2017
Nofer (Al-Alamia)
Toilet Accessories
Spain
Sea
21/May/17
Waterproofing and Thermal InsuEgypt WIDOS
Page 7 of 9
-
Clamps for Widos Stub End HolGermany Air
23/Feb/17 05/Mar/17
Burullus Combined Cycle Power Project ‐ Purchase Orders Log SN
PO Date
Type
Dept
F/L
E/M/C
Year
Local Supplier
Foreign Supplier
Item Description
Origin
Air/Sea
Delivery Date
515
20/Feb/17 PO
OPE
F
M
2017
NUOVA SGUASSERO
GRP Spacers, Mesh & C ChannItaly
Sea
05/May/17
516
27/Feb/17 PO
TPD
F
M
2017
GH Italia Cranes and Components
Overhead Cranes for WorkshopSpain/ItalySea
22/May/17
517
06/Mar/17 PO
TPD
L
E
2017 Al Masria for Electrical Industries & Works
Wiring Devices (Explosion Proo Italy
20/Mar/17
518
05/Mar/17 PO
OPE
F
M
2017
YMI Co LTD
Titanuim Material
Korea/JapAir
14/Apr/17
519
15/Mar/17 PO
TPD
F
E
2017
SIELTE SPA
Paging System
Germany Air
24/May/17
520
Inland
27/Feb/17 PO
OPE
L
C
2017 Bita for Engineering & Trading
Chemical Cleaning Lining and InEgypt
Inland
521 14/May/17 PO
OPE
F
M
2017
Safet
Welding Electrodes
Italy
Sea
522
09/Mar/17 PO
TPD
F
M
2017
FAS Funi e Attrezzature per Sollevamento SpA
Miscellaneous Hoists
Italy
Sea
27/Jul/17
523
03/Apr/17 PO
TPD
L
C
2017 FAM Media
Signage
Egypt
Inland
17/Apr/17
27/Feb/17 05-Apr-17 12-Apr-17
524
15/Mar/17 PO
TPD
F
M
2017
GH Italia Cranes and Components
Overhead Cranes - Extra Mater Spain/ItalySea
525
02/Apr/17 PO
OPE
F
M
2017
RE.CO.MA
Bundles RCM2-H Spare Parts Austria/ItaAir
526
15/Mar/17 PO
PUR
F
E
2017
Economic Electric Company FEMI
Cable Trays and Accessories
Italy
Sea
527
20/Mar/17 PO
TPD
L
E
2017 Anzma-Tech
Access Control System
USA
Inland
528
20/Mar/17 PO
OPE
F
M
2017
DRAGFLOW S.R.L
Chemical Hoses and Titanium CItaly
Air
529
21/Mar/17 PO
OPE
F
M
2017
ETEA Sicurezza
Integration of Ethernet Module i Italy
Air
20/Apr/17
530
02/Apr/17 PO
OPE
F
M
2017
Williams Form Engineering
Special Anchor Plates, End CapUSA
Air
07/May/17
Williams Form Engineering
Post Tension Rods
USA
Sea
30/Apr/17
MV Termination Lugs
Egypt
Inland
27/Mar/17
Access Control System
USA
531
02/Apr/17 PO
OPE
F
M
2017
532
27/Mar/17 PO
OPE
L
E
2017 El Masria for Cables Manufactory-EMECA
533
30/Mar/17 PO
TPD
L
E
2017 Anzma-Tech
534
02/Apr/17 PO
OPE
F
M
2017
535
30/Apr/17 SC
TPD
L
C
2017 Guardian
536
05/Apr/17 PO
TPD
F
C
2017
537
11/Apr/17 PO
TPD
L
E
2017 ICOT
538
10/Apr/17 PO
OPE
F
M
2017
539
11/Apr/17 PO
OPE
L
M
2017 Al Salem Trading
Welding Electrodes
540 18/May/17 PO
TPD
L
E
2017 Universe
Data Network Accessories
Egypt
Safet
Italpannelli SRL
Veka Kimya Petrol ve
19/Apr/17 21/Apr/17 03/May/17 17/Apr/17 01/May/17
Inland
27/Apr/17
Pressure and Temperature Rec Italy
Air
16/Apr/17
Metal Fabrication
Egypt
SC
Sandwich Panel
Italy
Sea
CCTV Console
USA
Inland
13/Apr/17
Welding Electrodes
UK
Air
22/Apr/17
24/May/17
Inland
11/Apr/17
Inland
01/Jun/17
541 10/May/17 PO
TPD
L
C
2017 Liveart
Residential Furniture
Egypt
Inland
542
18/Apr/17 PO
TPD
L
E
2017 ElSewedy EMAS
Lighting Panels UMB
Europe
Inland
18/Apr/17
542
18/Apr/17 PO
TPD
L
E
2017 ElSewedy EMAS
LV Switchgear
Europe
Inland
18/Apr/17
544
11/Jun/17 PO
TPD
F
C
2017
Italpannelli SRL
Sandwich Panel
Italy
Sea
545
13/Apr/17 PO
OPE
F
E
2017
Global Sourcing Company
LV Terminal Lugs
Germany Air
546 04/May/17 PO
TPD
F
E
2017
Tesylab Company
Master Clock System
Italy
Sea
13/Jul/17
547
18/Apr/17 PO
OPE
L
C
2017 Bita for Engineering & Trading
Ceramic Fiber
France
Inland
18/Apr/17
548
20/Apr/17 PO
TPD
L
C
2017 Jotun
549
24/Apr/17 PO
OPE
F
M
2017
YMI Co LTD
Titanuim Material
Korea/JapAir
550
18/Apr/17 PO
PUR
F
E
2017
Economic Electric Company FEMI
Cable Trays and Accessories
Italy
551
30/Apr/17 PO
TPD
L
E
2017 Anzma-Tech
552 23/May/17 PO
TPD
F
M
2017
MAICO ITALIA-SEMCO
Fans
553 23/May/17 PO
TPD
F
M
2017
MAICO GULF-SEMCO
Fans
554
OPE
F
M
2017
WIDOS
Foil Set WIDOS 20000/2 EnhanGermany Air
04/May/17 27/Jun/17
24/Apr/17 PO
Epoxy Coating for External SteeEgypt
Inland
30/Jul/17 20/Apr/17
20/Apr/17 14/May/17
Sea
11/Jul/17
Inland
30/Apr/17
Italy
Sea
01/Aug/17
UAE
Sea
Access Control & Security SysteUSA
18/Jul/17
555 02/May/17 PO
TPD
L
E
2017 Grand International
Wiring Devices
France
Inland
556
12/Jun/17 PO
TPD
F
C
2017
Italpannelli SRL
Sandwich Panel
Italy
Sea
10/Jul/17
557 03/May/17 PO
OPE
F
M
2017
IGAMM S.R.L.
Gaskets
Italy
Air
24/May/17
ALFAQUADRI Company
LV Switchgear
Italy
Sea
08/Jul/17
Cranes
Egypt
SC
558 09/May/17 PO
TPD
F
E
2017
559 09/May/17 SC
TPD
L
M
2017 Misr for Engineering Works
560 18/May/17 PO
TPD
F
E
2017
Torgovity Dom Velan Limited
Explosion Proof Lighting FixtureRussia
561 11/May/17 PO
TPD
F
M
2017
GH Italia Cranes and Components
Gantry Crane
562 14/May/17 PO
OPE
L
M
2017 Al Salem Trading
563 15/May/17 PO
OPE
L
E
2017 Elsewedy Egytech
564 17/May/17 PO
OPE
F
M
2017
Special Bolt
Bolts, Stud Bolts & Nuts
Italy
565
12/Jun/17 PO
TPD
F
E
2017
Italian Lighting/Tecmar
Lighting Fixtures
Italy
Sea
24/Jul/17
566 25/May/17 PO
TPD
L
E
2017 Grand International
Wiring Devices
France
Inland
06/Jul/17
567 25/May/17 PO
TPD
L
E
2017 Anzma-Tech
Access Control & Security SysteUSA
Inland
25/May/17 20/Jun/17
Welding Electrodes Earthing Cables
Italian Cable Company
Air
Spain/ItalySea
15/Jun/17 01/Jun/17
Inland
14/May/17
Inland
29/May/17
Sea
28/Jun/17
568 23/May/17 PO
OPE
F
E
2017
LV Cables
Italy
Sea
569
01/Jun/17 PO
TPD
L
E
2017 Summit Technology Solutions
Pabx
Egypt
Inland
15/Jun/17
570 30/May/17 SC
OPE
L
M
2017 Sahara Industrial Services
Service Agreement - Chart RecoEgypt
SC
30/May/17
571 31/May/17 PO
OPE
F
M
2017
GH Italia Cranes and Components
Bus Bar System for Overhead CSpain/ItalySea
15/Jun/17
572
06/Jun/17 PO
OPE
F
M
2017
Veka Kimya Petrol ve
Shoulder Washer
USA
Air
18/Jun/17
573
18/Jun/17 PO
TPD
F
C
2017
Italpannelli SRL
Sandwich Panel
Italy
Sea
16/Jul/17
574
11/Jun/17 PO
TPD
F
M
2017
MAICO ITALIA-EGEMECH
Exhaust Fans
Italy
Sea
20/Aug/17
575
08/Jun/17 PO
OPE
F
M
2017
NUOVA SGUASSERO
GRP Spacer
Italy
Sea
15/Jun/17
576
14/Jun/17 PO
OPE
F
M
2017
Global Sourcing Company
Vacuum Air Breaker Valves
Korea
Air
12/Jul/17
577
16/Jul/17 PO
TPD
F
E
2017
Tesylab Company
Pabx
USA
Sea
24/Sep/17
Air
22/Aug/17
578
25/Jul/17 PO
TPD
F
E
2017
Torgovity Dom Velan Limited
Explosion Proof Lighting FixtureRussia
579
05/Jul/17 PO
OPE
F
M
2017
WIDOS
Computer Boards
580
04/Jul/17 PO
OPE
F
E
2017
RESINEX Trading S.R.L
Plastic Light Buoys-NavigationaItaly
Sea
581
10/Jul/17 PO
TPD
L
E
2017 Universe
Data Network Accessories
Egypt
Inland
10/Jul/17
582
06/Jul/17 PO
TPD
L
E
2017 Anzma-Tech
Access Control System
USA
Inland
583
10/Jul/17 PO
OPE
F
M
2017
06/Jul/17 29-Jul-17 29-Sep-17
RE.CO.MA
Page 8 of 9
Germany Air
Bundles RCM2 Hoses, Valves &Austria/ItaAir
19/Jul/17 30/Sep/17
Burullus Combined Cycle Power Project ‐ Purchase Orders Log SN
PO Date
Type
Dept
F/L
E/M/C
Year
Local Supplier
Foreign Supplier
Item Description
Origin
Air/Sea
Delivery Date
584
27/Jul/17 PO
TPD
F
E
2017
Italian Lighting/Tecmar
Lighting Fixtures
Italy
Sea
585
16/Jul/17 PO
OPE
F
M
2017
PIPELIFE
Gaskets
Norway
Air
10/Sep/17 23/Jul/17
586
18/Jul/17 PO
OPE
F
M
2017
Global Sourcing Company
Valves for ZTM System
Italy
Air
31/Jul/17
Access Control System and TurUSA
Inland
SAFET
Fittings & Bolts and Gaskets for Europe
Air
21/Aug/17
587
17/Jul/17 PO
TPD
L
E
2017 Anzma-Tech
588
19/Jul/17 PO
OPE
F
M
2017
589
20/Jul/17 PO
TPD
F
C
2017
Italpannelli SRL
Sandwich Panel
Italy
Sea
17/Aug/17
590
16/Jul/17 PO
PUR
F
C
2017
SAFET
Life Jackets
Italy
Air
22/Jul/17
591
19/Jul/17 PO
OPE
L
M
2017 Middle East Company for Engineering
592
25/Jul/17 PO
PUR
F
C
2017
Sideram SRL
593
27/Jul/17 PO
TPD
F
M
2017
594
02/Aug/17 PO
OPE
F
M
2017
595
31/Jul/17 PO
TPD
L
C
2017 Liveart
Residential Furniture
596
30/Jul/17 PO
OPE
F
M
2017
Plastek S.r.l
597
02/Aug/17 PO
TPD
L
C
2017 Protecta International Egypt
Instrument Hook-Up Support (E UK/USA Inland Rivets
Italy
EGEMECH
Fans
UAE
Global Sourcing Company
PVC Saddles & PTFE Sliding P USA Egypt PVC Saddles Epoxy Coatings
Page 9 of 9
Italy
Air
17/Jul/17
26/Jul/17 01/Aug/17
Sea
21/Sep/17
Air
01/Sep/17
Inland Air Sea
31/Jul/17 31-Jul-17 28-Aug-17
Inland
13/Sep/17