Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

2 of 24

Index Table 1

Summary of Project Progress .................................................................................... 4

2

EHS dashboard ........................................................................................................... 5

3

Areas of Concern ........................................................................................................ 6

4

Engineering and Design (Siemens AG) ..................................................................... 7

5

Engineering and Design (Orascom Construction) ................................................. 12

6

Procurement and Manufacturing (Siemens AG) ..................................................... 13

7

Procurement and Manufacturing (Orascom Construction) ................................... 16

8

Shipment Details ....................................................................................................... 18

9

Site Activities (Siemens AG) .................................................................................... 19

10 Site Activities (Orascom Construction)................................................................... 20 11 Warranty Activities .................................................................................................... 21 12 Commercial Issues ................................................................................................... 22 13 Scheduling ................................................................................................................. 23

Appendices SAG:

OC:

A 1.

Schedule

B 1.

Correspondence status OC

A 2.

Correspondence status CON

B 2.

DTL status OC

A 3.

Correspondence status SAG

B 3.

A 4.

DTL status

Burullus Progress Report incl. Photos

A 5.

Financial Report

B 4.

Payment Report

A 6.

Shipments Status

B 5.

Shipments Status

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

3 of 24

Abbreviation List BDT

Blow Down Tank

CW

Calendar Week

DTL

Document Transmittal Letter

GENO

electrical Generator

GT

Gas Turbine

HP

High Pressure

HRSG

Heat Recovery Steam Generator

HV

High Voltage

HVAC

Heat Ventilation Air Conditioning

I&C

Instrumentation and Control

IP

Intermediate Pressure

LNTP

Limited Notice to Proceed

LP

Low Pressure

P&ID

Piping and Instrumentation Diagram

PPSPS

Particular Plan regarding Safety and Protection of Health

RfQ

Request for Quotation

ST

Steam Turbine

OC

Orascom Construction

SFCS

Steam Generator, Fuel & Cooling Systems

HTT

Heat Transfer Technology

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

4 of 24

1 Summary of Project Progress 1.1 Siemens AG Regular meetings conducted this month: Owner: Weekly site management meetings. Consortium: Consortium weekly site management meetings. Consortium weekly site EHS meetings. Consortium monthly EHS meeting ∂ Milestones achieved within the reporting period: o Hot Commissioning and Phase C tests for GT 21/22 completed and Units are ready for RTR. ∂

25,3 Million Man-hours without LTI.

Shipping of OEMs, HRSG, Cooling Towers, Pumps and Electrical Equipment has been continued as per schedule.

Marine works Delay – (cooling water intake delay due to the impact of delayed offshore Mine scan and war remains Survey requested by Army, and the current ongoing delay to the Soil Investigation works). There is a substantial risk if the offshore element of the cooling water intake line is not completed prior to October 2017, then the whole section of this work would be delayed until May 2018 due to weather and sea conditions over the winter period, this would further effect the Combined cycle works for all the blocks 10,20,30,40, plus the Simple Cycle for block 10.

1.2 Orascom Construction See Appendix B 3. “Site Progress Report Cut-off date August 01, 2017 + Progress Photos”

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

5 of 24

2 EHS dashboard

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

6 of 24

3 Areas of Concern

#

Item Description

References

Providing construction power: ∂ Contractor is previously provided power for construction, utilizing Generators, and is seeking reimbursement for all costs associated with the provision of the Construction power 1

∂ Consortium requests Owner assistance in completing a Maintenance contract with Distribution Company to enable future rerouting and maintenance works to be carried out without delay

OC-EEHC-L-00023 SAG-OC_EEHC-L-00034 SAG-OC_EEHC-L-00044 SAG-OC_EEHC-L-00047

OCSM-EEHC-L-00098

∂ Construction Power Instability is hindering Contractor’s activities SAG-OC-EEHC-L-00018 SAG-OC-EEHC-L-00023 EEHC_SAG-OC-L-00004 SAG-OC-EEHC-L-00025 2

Site coordinates and GIS relocation – Delay to the works

EEHC_SAG-OH-L-00015 SAG-OC-EEHC-L-00029 EEHC_SAG-OH-L-00037 SAG-OC_EEHC-L-0006 EEHC_SAG-OC-L-00042 SAG-OC_EEHC-L-00150

Site Preparation Agreement (SPA) substantial increase in quantities:

3

Due to the substantial increase in quantities of the SPA, the Contractor has suffered many delays which were not attributable to the Contractor.

SAG-OC_EEHC-L-00162 SAG-OC_EEHC-L-00164 SAG-OC_EEHC-L-00169

Effect of the initial delays of the SPA works to the EPC works SAG-OC_EEHC-L-00246 especially relating to the combined cycle works for block 10 and 20 SAG-OC_EEHC-L-00273 5

Marine Works Delays due to Delay of Offshore Mine Scan. And issuance of Shore Protection and AFOA Permits / Approval Intern Siemens

SAG-OC_EEHC-L-00156 OC-EEHC-L00161

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

7 of 24

Delay in issuing of Permit effected the critical path for the Combined SAG-OC_EEHC-L-00156 Cycle works due to the delay to the Intake and Discharge works Delay in performing the Offshore mine scan is effecting the critical path for SAG-OC_EEHC-L-00166 the combined cycle schedule for all the works. SAG OC-EEHC-L-00248 There is a substantial risk that if the offshore element of the cooling SAG-OC_EEHC-L-00166 water intake line is not completed prior to October 2017, then this whole section of the work would be delayed until May 2018 due to SAG OC-EEHC-L-00248 weather and sea conditions over the winter period, this would further effect the Combined cycle works for all the blocks 10,20,30,40, plus SAG OC-EEHC-L-00267 the Simple Cycle for block 10. SAG OC-EEHC-L-00273 Sea Conditions adversely affecting the Soil Investigation and subsequent Marine offshore works. Now all works should be SAG OC-EEHC-L-00294 completed in limited duration due to the winter season exclusion SAG OC-EEHC-L-00306 SAG OC-EEHC-L-00307 SAG-OC_EEHC-L-00329 SAG-EEHC-L-00291 6

Social Insurance Authority Fees

SAG OC-EEHC-L-00076 SAG-EEHC-L-00240

7

Deliveries of equipment as a result of extended period of customs clearance

8

GASCO works associated with the Gas Reducing Station and settlement of the main Gas line, including EHS concerns

OCSM-EEHC-L00110

4 Engineering and Design (Siemens AG) 4.1 Plant Layout ∂ Site support and coordination meetings

4.2 Civil ∂ Civil Engineering Meetings at extended intervals since design is mature (now mainly with regard to construction issues). ∂ Civil Design of Spare Transformer Foundation finalized and under execution. ∂ Information exchange on design of the water Intake structures (finalization of design still pending on off-shore geotechnical investigation) ∂ Laydown areas for Service scope under preparation Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

8 of 24

∂ General site support

4.3 Process Updating of P&IDs due to engineering progress ongoing. - Duplication of Automation for other units started

4.4 Electrical / I&C (hardware/software) ∂

Ongoing engineering for electrical components for coming Units continued as: - Low voltage switchgears BFA/BFB/BFC/BFD/BMA (ST, WSC, CT), - Electrical protection systems CHA (ST), - MV- and LV-cables - I&C equipment.

Cable way planning and routing is further processing Cable pulling cards hand over to site for continuing cable pulling ongoing

Continued Site support for erection and commissioning works of electrical systems and I&C.

500kV GIS: - 500 kV GIS phase 1 energized since November 2 nd, 2016. 500 kV GIS phase 2 energized since April 18th, 2017. TOAC reached on May 2 nd 2017.

∂ Distributed control system DCS: - Common Systems: Manufacturing for furniture and tables for central control room has been finished and is delivered to site. Erecting is done. Black Boxes for Open Cycle and Combined Cycle have been defined; signal exchange has been finished, interfaces to DCS are completed. Detail design for substation (GIS) interface has been finished, the communication software is finished. - Open Cycle Unit 41/42: Distributed control system DCS, manufacturing of ET200 stations is finished, the cabinets are already installed in the PCC. The cabinets are in operation. Local measurement devices have been delivered and are available at site. Manufacturing for emission monitoring system CEMS has been finished, system is available at site and is in operation - Open Cycle Unit 31/32: Distributed control system DCS, manufacturing of ET200 stations is finished, the cabinets are already installed in the PCC. The cabinets are in operation. Local measurement devices have been delivered and are available at site. Manufacturing for emission monitoring system CEMS has been finished, system is available at site and is in operation

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

9 of 24

- Open Cycle Unit 21/22: Distributed control system DCS, manufacturing of ET200 stations is finished, the cabinets are already installed in the PCC. The cabinets are in operation. Local measurement devices have been ordered. Manufacturing for emission monitoring system CEMS has been finished, system is available at site and is in operation - BoP Combined Cycle Unit 10: Distributed control system DCS, detail Engineering is finished. HW manufacturing is finished The cabinets are installed in PCC Manufacturing for emission monitoring system CEMS for GT11 / GT12 has been finished, system is available at site Measurement devices have been delivered and are available at site. - BoP Combined Cycle Unit 20: Distributed control system DCS, detail Engineering is finished. HW manufacturing is finished The ET200 cabinets are installed in PCC Measurement devices have been delivered and are available at site. - BoP Combined Cycle Unit 30: Distributed control system DCS, detail Engineering is finished. HW manufacturing is finished The ET200 cabinets are installed in PCC Measurement devices have been delivered and are available at site. - BoP Combined Cycle Unit 40: Distributed control system DCS, detail Engineering is finished. HW manufacturing is finished. The ET200 cabinets are installed in PCC Measurement devices are on the way to the site (will be arrived end of August)

4.5 BOP Piping System Component

Engineering and Design

Insulation

- Piping Basic Design in 3D model finished. - Piping Detail Design finished - Design finished

Valves

-

Piping

Intern Siemens

Detail Design finished

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

10 of 24

4.6 Mechanical, Fuel & Cooling Systems ∂ Fuel-Supply-System - HEAT FGSS Unit part: Unit 11/12/21/22/31/32/41/42 delivered to erection site / completed - Petrogas FGSS Common Part completed ∂ Gas Compressor - Common components for all units delivered to site (nitrogen generator, switch-over valve skids, I&C-container) - Gas Compressor Unit 40 delivered to erection site - Gas Compressor Unit 30 delivered to erection site - Gas Compressor Unit 00 delivered to erection site - Gas Compressor Unit 20 delivered to erection site - Gas Compressor Unit 10 delivered to erection site ∂ Wet Cell Cooling Tower -

Unit 10 delivered to erection site Unit 20 delivered to erection site Unit 30 delivered to erection site Unit 40 delivered to erection site Balance material shipment ongoing (6122)

∂ Bypass stack -

Bypass stack Unit 42 delivered to erection site Bypass stack Unit 41 delivered to erection site Bypass stack Unit 32 delivered to erection site Bypass stack Unit 31 delivered to erection site Bypass stack Unit 22 delivered to erection site Bypass stack Unit 21 delivered to erection site Bypass stack Unit 12 delivered to erection site Bypass stack Unit 11 delivered to erection site Duct pieces to HRSG delivered to erection site Balance material shipment ongoing (6137, 6141)

∂ HP Bypass station -

Unit 41/42 shipment (5204) delivered to erection site Unit 31/32 shipment (5025) delivered to erection site Unit 21/22 shipment (4856) delivered to erection site Unit 11/12 shipment (4877) delivered to erection site

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

11 of 24

4.7 HTT / Steam Generator 4.7.1 -

HRSG / HTT Basic process design HRSG completed. Basic mechanical design pressure parts HRSG completed. Detailed mechanical design of HRSG modules and vessels completed. Basic mechanical design HRSG main steel structure and casing completed. Detailed mechanical design HRSG main steel structure and casing completed. Basic mechanical design of stack completed. Basic design platforms, stairs and ladders final. Detailed design platforms, stairs and ladders completed. HRSG 3D modelling and piping design in progress. Final review of large bore isometrics completed. Small bore piping design completed. Specifications of HRSG equipment (valves, control valves, attemperators, silencers, stack dampers, etc.) completed. Receipt and review of vendor documentation completed. Design of maintenance provisions completed. Erection manual issued. Completed Operation and Maintenance manual. Continued compiling manufacturing documentation of the subcontractors/suppliers.

4.8 OEM Products 4.8.1

Gas Turbines

- Engineering, procurement and manufacturing is completed. 4.8.2

Steam Turbines

- Engineering and procurement is completed. 4.8.3

Generators

- Engineering, procurement and manufacturing is completed.

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

12 of 24

5 Engineering and Design (Orascom Construction) 5.1 Civil and Architecture ∂ SAG documents are regularly reviewed and comments issued to SAG as applicable. ∂ Review of OC technical submittals. ∂ Site support (reply for TQ and clarification emails). Issued to OC for Construction: ∂ ∂ ∂ ∂ ∂ ∂

Steam turbine building architectural drawings Service water pump house area concrete neat line piles arrangement Revised onshore discharge structure concrete neat line foundation plan & sections Revised truck unloading shed regeneration plant structural steel Service water pump house semi - gantry crane steel structure supports Revised steam turbine building structural steel framing elevation

5.2 Plant Layout and Piping Issued to OC for Construction: ∂ Revised plant layout.

5.3 Mechanical & Process ∂ Review of suppliers technical submittals.

5.4 Electrical / I&C (hardware/software) Issued MTOs: ∂ BOP cable trays of service water pump house (00UQB) - Material Take - Off MTO "100%' ∂ BOP cable trays' supports of service water pump house (00UQB) - Material Take-Off MTO "100%' Issued to OC for Construction: ∂ Foundation earthing typical for (PAR) system units 10, 20, 30 & 40 ∂ Revised wet cell cooling tower building (20URA) lightning protection system layout shop drawing typical for (30URA & 40URA) ∂ IP dect RBS system shop drawing layout ∂ BOP cable trays & supports arrangement drawing for service water pump house ∂ Revised guards dormitory building (00UYB) ground floor lighting and power sockets system layout preliminary design ∂ Revised guards dormitory building panel schedules preliminary design ∂ Earthing plan for pump house area plan Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

∂ ∂ ∂ ∂ ∂ ∂ ∂ ∂

Page

13 of 24

Revised duct bank & manholes details hypochlorite building area (2 sheets) Revised foundation earthing for service water pump house Preliminary plant overall paging and siren systems one line diagram Revised BOP cable trays & supports arrangement drawing for service water pump house Revised earthing plan for pump house area plan Revised preliminary plant overall telephone, Lan and general clock systems one line diagram Hydrogen building (00UTG02) ground floor lighting system shop drawing layout Hydrogen building lightning system protection roof plan

6 Procurement and Manufacturing (Siemens AG) Component

Company

Workshop Equipment

Walter & Müller

Location of Headquarter Germany

6.1 Civil - Please refer to item 6

6.2 Process - Please refer to item 6

6.3 Electrical / I&C (hardware/software) - For details Please refer to item 4.4

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

14 of 24

6.4 Piping Component Piping - Open Cycle Supply and Prefabrication incl. Supports ∂ Finalized. All material has been delivered. Piping – High Pressure Supply and Prefabrication ∂ Delivery completed Piping - Medium and Low Pressure Supply and Prefabrication ∂ All Material sent Piping – HP, IP & LP Supports (excluding Open Cycle supports) ∂ nearly all Material sent Piping – GRP Material (Cooling water + pressurized GM Pipes) ∂ Delivery complete Insulation ∂ Delivery nearly completed Valves Lot 1 – Manufacturer HP – P91 Gate Valves Valves Lot 2 – Manufacturer HP – CS Gate Valves and Non Return Valves Valves Lot 3 – Manufacturer HP Valves Valves Lot 4 – Manufacturer IP/LP Gate Valves and Non Return Valves Valves Lot 5 - Manufacturer IP/LP Valves Valves Lot 6 – Distributor Package Valves Lot 7 – Open Cycle Package ∂ Finalized. All valves have been delivered. Control Valves Lot 8 – HP Control Valves Control Valves Lot 9 – IP/LP Control Valves Control Valves Lot 10 – Butterfly Control Valves (Metal Sealing)

Company

Location of Headquarter

VAM/BPT

Austria

Namin Siemens LTD.

Korea

Lisega

Germany

FKT

Germany

IIG HP Valves

Germany Netherlands

HP Valves HP Valves HP Valves HP Valves Siekmann

Netherlands Netherlands Netherlands Netherlands Germany

Klaus Union Daume Daume Pentair

Germany Germany Germany Pentair

India

6.5 Mechanical - Please refer to item 6 Fire detection and protection system for UMA, UMB, and Transformer yard

- Erection for units 11/12 ongoing - Erection for unit 10 under preparation 6.6 HTT / Steam Generator 6.6.1

HRSG / HTT

Ordering: - Nothing to report Manufacturing Main Parts Pressure Part Modules (@GS Entec - South Korea) - Modules for all units shipped. Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

15 of 24

Drums, HP Separator and Vessels - LP and IP drum, HP separator and blow down tank for all units shipped. Main Steel, Casing, Ducting and Stack (@VPE - Thailand) - Main steel, casing and inlet duct all units shipped. - Stack and outlet duct all units shipped. Secondary Steel - Shipped for all units. LB Piping fabrication (@SGC – South Korea) - Piping for all units shipped.

6.7 OEM Products 6.7.1

Gas Turbines

- Engineering, procurement and manufacturing is completed. 6.7.2

Steam Turbines

- Manufacturing of steam turbines components is completed except for insulation (Unit 40). 6.7.3

Generators

- Engineering, procurement and manufacturing is completed.

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

16 of 24

7 Procurement and Manufacturing (Orascom Construction)

Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

JUN.2015

Completed Procurement Works

Third party testing lab Contractor and Owner Temporary Site JUL.2015 offices On Site concrete batch plant SEP.2015 Steel structure fabrication Painting for GIS steel structure Reinforcing Steel (Partial PO representing 30% of the total estimated quantity) OCT.2015 Roofing and waterproofing works Temporary RO plant Wall and roof metal cladding NOV.2015 Steel pipes for driven piles GIS building steel doors GIS building aluminum windows Turbines' halls overhead cranes DEC.2015 GIS HVAC works Steel structure for the CTG (4 blocks) GIS Building Raised Floor GIS building roll up door Cable Trays including Supports JAN.2016 CTG HVAC works GIS firefighting and alarm works CCR HVAC Works Fire Fighting valves and hydrants Feb.2016 I&C Cables for eight (8) GTGs Secondary Earthing System Aux Erection Material

Intern Siemens

Vendor CEL

Country of Origin Egypt

ICON Lafarge NSF Jotun

Egypt Egypt Egypt Egypt

Feralpi Siderurgica SPA A-Build Metito Italpanneli Umran France Metal AluTech GH SEMCO KiMetal / NSF Proactive ESIA FEMI SEMCO Total Walter SEMCO AVK TK Cables Chembre Chembre

Italy Egypt Egypt Italy Turkey Egypt Egypt Spain Egypt Italy Egypt Italy Italy Egypt Germany Egypt Germany Italy Italy Italy

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 43 43 43 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 70 71

Mar.2016

Apr. 2016

May 2016

June 2016

Jul 2016

Aug 2016

Sep 2016

Oct 2016 Nov 2016

Intern Siemens

Page

GIS, GIS Control, and CCR Lighting Fixtures Fire Fighting Pump Water and Waste Water Treatment Plant Containerized fire-fighting system Air Compressor Wall and roof metal cladding for CTG Wick Drains MV/LV Power Cables' Accessories Underground firefighting pipeline LV Switchgear RCCP lines Fire Fighting for CCR Building U/G HDPE Pipes Gas pipeline Compressed air system pipelines Gas Pipeline Balance Heavy lifting works CCTV System Clock System CTG & STG Roll up Doors UPS Emergency Shower & Eye Wash Gas storage racks Co2 Breather Level indicator Horizontal Centrifugal Pumps Gas Bottles Sump Pumps Hydrogen Generation Plant PABX Obstruction Lights Valves Special Supports Tanks Accessories Special Supports Vertical Pumps Travelling Water Screens Off shore Cooling Water Pipeline Onshore Cooling Water Pipeline Fire fighting for BoP Buildings Valves for Cooling Water Lines

Disano Gruppo Aturia EMIT/Metito SANCO Atlas Copco Italpanneli Bonar Tyco Shield Alfaquadri NPC / ECPC ETEA Euro Tubi CTA CTA CTA SARENS FGM Tesylab ISEA Benning Safetec Ramcro TWS Seven Seas Garbarino Recoma Seven Seas IPM - Easter Electrolyster Tesylab Clampco PARCOL Tuxor Seven Seas Tuxor Termomicnanica Tarnos Pipelife Agru SANCO PARCOL

17 of 24

Italy Italy Italy Italy Italy Italy Netherland Italy UK Italy Egypt Italy Italy Italy Italy Italy Italy Italy Italy Italy Germany Italy Italy Italy Italy Italy Italy Italy Italy / India Italy Italy Italy Italy Italy Italy Italy Spain Norway Austria Italy Italy

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

72 73 74 75 76 77 78 79 80 81 82 83 84 85

Dec 2016

Jan 2017

Feb 2017

Mar 2017 Apr 2017 May 2017

Page

Stop Logs HVAC for BoP and Ancillary Buildings Sump Pumps HRSG Lighting Fixtures Valves for Chemical Cleaning Instrumentation Piping for Chemical cleaning Valves for chemical cleaning Workshop OH Crane Intake Sediment Removal System Intake Heads Accessories Labels & Tags CCTV Console Pump House Gantry Crane

Eurocom SEMCO Garbarino Beghelli Gusmar Endress & Hauser CTA Global Sourcing Gusmar GH Dragflow William Form FAM Media ICOT GH

18 of 24

Italy Egypt Italy Italy Italy Italy Italy Italy Spain Italy USA Egypt USA Spain

8 Shipment Details 8.1 Siemens AG See Appendix A 6 “Shipments Status”.

8.2 Orascom Construction See Appendix B 5 “Shipments Status Report”.

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

19 of 24

9 Site Activities (Siemens AG) 9.1 Unit 00 - xxEK modifications (HW&SW) completed - xxEKH outage works completed

9.2 Block 2 Unit 21/22 - Cleaning of 21/22 BAT brushes - Closing of punch items for GT21/22 prior to performance test and RTR

9.3 Block 1 Unit 11/12 - 11/12/13 BAT commissioning ongoing - 12 CHA transformer protection commissioning (secondary injection) ongoing - 11/12 CPD energized and I&C signal test started

9.4 Block 3 Unit 31/32 - Commercial Operation (offline due to GASCO outage) Preparation of units for restart

9.5 Block 4 Unit 41/42: - Commercial Operation (offline due to GASCO outage) Preparation of units for restart

9.6 Overall Plant/Operation Nothing to report.

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

20 of 24

10 Site Activities (Orascom Construction) 10.1 Over all progress status: See Appendix B 3. “Site Progress Report Cut-off date August 01, 2017 + Progress Photos�

10.2 Quality Management/ Quality Control - QC Statistics:

IIR'S Status Item

Total

Open

Civil

14778

Mech Elec Total

Closed

Rejected

0

1st 14770

2nd 5

7213

0

7126

55

32

4265 26256

0 0

4239 26135

22 82

4 39

3

NCR Status NCR Status

Total

Open

Closed

Rejected

Piles/D. Walling/Ground Anchors

76

0

76

0

Water & Damp Proofing

3

0

3

0

Structural Concrete

6

0

6

0

Drainage/Underground Utilities

2

0

2

0

Structural Steelwork

7

0

7

0

Block Works/Brick Works

1

0

1

0

Electrical Installations

20 32

3 2

17 30

0 0

147

5

142

0

Mechanical Installations Total

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

21 of 24

MRR's Status

11

MRR's Status

Total

Accepted

Pending

Rejected

Civil

295

295

0

0

Mechanical

213

213

0

0

Electrical

412

412

0

0

Architectural

168

168

0

0

Steel Rebar

181

181

0

0

Steel Structure

278

278

0

0

I&C

39

39

0

0

Elec-Mech

29

29

0

0

Total

1615

1615

0

0

Warranty Activities Warranty Cases

Total

32 Thereof

Closed

Open

28 Thereof

Intern Siemens

4

Accepted

5

Accepted with Reservations

13

Rejected

6

Done (waiting for delivery of SP to Owner)

0

Done (waiting for signature by Owner)

4

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

22 of 24

12 Commercial Issues Siemens AG / Orascom Construction 12.1 Payment Status: a) Siemens AG Scope:

- Utilization Request No. 9 (34’4 EUR) was paid on 26 July 2017. - Payment for Utilization Request No. 10 with ref. to Application for Payment dtd. 24 July 2017 (4 Milestones, Total: 11’8 EUR) is expected to be received in August 2017. - Overdue payments: EGP payments with regard to Application for Payment dated 09 May 2017 (1’0 EUR), Application for Payment dated 24 May 2017 (3’4) and Application for Payment dated 14 June 2017 (0’9) - Milestone “FOB Shipment Steam Turbine Core Engine (HP,IP,LP) - Unit 40” (EUR 3’5) held back due to further documentation requests received Upcoming Milestones scheduled to be achieved within the next 4 weeks: Total Amount to be paid

Activity

Milestone Activity

CC-ON-9

Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 10

CC-ON-10

Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 20

CC-ON-11

Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 30

CC-ON-12

Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 40

CC-ON-17

Finalisation of erection HRSG Modules - Unit 31

CC-ON-18

Finalisation of erection HRSG Modules - Unit 32

CC-ON-19

Finalisation of erection HRSG Modules - Unit 41

CC-ON-20

Finalisation of erection HRSG Modules - Unit 42 Total Value:

1.053.566,34 1.053.566,34 1.053.566,34 1.053.566,34 1.053.566,34 1.053.566,34 1.053.566,34 1.053.566,34 8.428.530,72

To be paid in EURO under the Hermes Facility Agreement

879.621,99 879.621,99 879.621,99 879.621,99 879.621,99 879.621,99 879.621,99 879.621,99 7.036.975,92

To be paid in equivalent EGP

173.944,35 173.944,35 173.944,35 173.944,35 173.944,35 173.944,35 173.944,35 173.944,35 1.391.554,80

- For further details please refer to the Annex A5_Financial Report b) Orascom Scope - See Appendix B 4. “Payment Report”

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

23 of 24

13 Scheduling Please find attached Owner’s updated schedule which indicates various impacted dates for the Power to Grid milestones. The variances and delays in the below table and schedule do not reflect the consortium entitlement due to all impacts from SPA change in quantities or Site Stoppage but reflect the best forecasted finish dates after implementing serious mitigation plans to adsorb the maximum possible of the occurred delays. The mine scan works are now complete and the Soil Investigation works have commenced, however these works are also suffering ongoing delays due to sea conditions as noted in the below table. Once the Soil Investigation works associated with the offshore works are complete and the results can be analysed by the design team, then further review of the schedule can be made to see where any further mitigation measures can be adopted. In an effort to mitigate the effect of the delay it is worth note that the Mobilisation of the Dredging equipment has started and the Dredger will arrive early next month (Note arrived on site 8th August 2017), the effect of this mitigation will be reviewed in the next month’s schedule. Impacted Dates: Nov-15

Owner Schedule 25-July-17

Base Line Project Date

Variance Between Impacted Power Impacted Power to Grid Date to Grid Date Updated Schedule Updated Schedule Cutoff Date July 25, Cutoff Date July 25, 2017 2017 and the BL Milestones date

POWER TO GRID 42

31-Dec-16

Done

POWER TO GRID 41

31-Dec-16

Done

POWER TO GRID 32

31-Dec-16

Done

POWER TO GRID 31

31-Dec-16

Done

POWER TO GRID 22

31-May-17

Done

POWER TO GRID 21

31-May-17

Done

POWER TO GRID 40

30-Apr-18

14-Nov-18

-198

POWER TO GRID 30

31-Mar-18

25-Oct-18

-208

POWER TO GRID 20

31-Dec-17

11-Aug-18

-223

POWER TO GRID 10

30-Nov-17

15-Jul-18

-227

Comments

Refference to letter: 2015-22-SAG-OC-EEHC-L-00342: Force Majeure due to bad weather conditions caused extra delays of 26 days during the period from 26th June 2017 till 25th Jul 2017 (which is the reported period in this documet).

This reduction in the overall negative variance has been achieved by utilizing significant measures to accelerate the works which include but are not limited to: ƒ Carrying out many activities concurrently.

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

Page

24 of 24

ƒ Extending working hours to 24 hours per day, 7 days per week (including night shifts, weekends and holidays). Additional manpower and staff have been mobilised to Site to cover the requirements for weekend working. Additional equipment has also been mobilised to Site to cover the additional down time and scheduled maintenance programmes necessary to ensure continuous operations, also additional large size equipment has been mobilised to Site especially for the EPC works. ƒ Deployment of additional expatriate supervisor personal of sub vendors in order to cope with the accelerated working regime as mentioned above. ƒ Mobilization from outside of Egypt of additional Contractor-owned equipment at a very short notice. ƒ Purchasing new equipment from outside of Egypt that requires payment in foreign currency. ƒ Redesign of and rerouting works, including cable routes associated with the GIS relocation ƒ We would note however that there are still substantial risks associated with the schedule, these include, but are not limited to: -

-

Marine works Delay – (cooling water intake delay due to the impact of the delayed offshore Mine scan and war remains Survey requested by Army, and the current ongoing delay to the Soil Investigation works). There is a substantial risk that if the offshore element of the cooling water intake line is not completed prior to October 2017, then this whole section of the work would be delayed until May 2018 due to weather and sea conditions over the winter period, this would further effect the Combined cycle works for all the blocks 10,20,30,40, plus the Simple Cycle for block 10. Deliveries of equipment as a result of extended period of customs clearance Offshore works (weather), now all works should be completed in limited duration due to the winter season exclusion. Increased risk due to the overlapping activities and congestion of the work area leading also to works access issues Overlapping activities due to SPA increase and increased inefficiency due to overlapping into combined cycle Works. Priority given to 1st Open Cycle of module 40 and 30, with power to grid targets in December 2016 at expense of other Works. Remaining works associated with the GIS building relocation e.g. the rerouting of the HV Cables and additional Cable Ducting. Weather delays – High winds and rains effecting the works Sea Conditions adversely affecting the Soil Investigation and subsequent Marine works offshore.

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

A 1. Schedule / Progress Curves -

see item 11

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


s

EG1019 Burullus

Progress Curves (Rev. 0U)

Progress Curve Project Consortium 100,0 90,0 80,0 70,0 60,0 50,0 40,0 30,0 20,0

Baseline

10,0

Actual / Forecast

0,0

Dez 15

Jan 16

Feb 16

Mrz 16

Apr 16

Mai 16

Jul 16

Aug 16

Sep 16

Okt 16

Nov 16

Dez 16

Jan 17

Feb 17

Mrz 17

Apr 17

Mai 17

Jun 17

Jul 17

Aug 17

Sep 17

Feb 18

Mrz 18

Apr 18

Mai 18

Jun 18

Jul 18

2,3

3,8

5,8

8,2

11,4

15,2

19,2

24,4

29,8

35,4

40,8

46,3

52,3

58,3

64,6

70,4

75,5

80,1

83,8

87,0

89,5

91,7

93,4

95,0

96,3

97,4

98,3

99,0

99,5

99,7

99,8

99,9

99,9

100,0

100,0

100,0

1,2

2,0

3,1

4,6

6,6

9,8

14,0

18,4

23,0

28,2

34,0

40,2

45,2

51,3

56,8

62,7

67,7

72,9

76,4

79,3

81,7

83,6

86,6

88,9

90,6

92,9

95,3

96,9

98,3

99,1

99,5

99,7

99,7

99,8

99,9

100,0

100,0

Design Consortium Supply Consortium Civil + Construction Consortium M + E Erection Consortium

Baseline Actual / Frcst Baseline Actual / Frcst Baseline Actual / Frcst Baseline Actual / Frcst

0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0

0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0

0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0

0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0

0,1 0,1 0,0 0,0 0,0 0,0 0,0 0,0

2,6 2,6 0,5 0,5 0,6 0,0 0,0 0,0

7,6 7,7 1,1 1,2 1,0 0,0 0,0 0,0

12,8 12,9 2,1 2,1 1,6 0,0 0,0 0,0

18,2 17,7 3,5 3,5 2,3 0,0 0,0 0,0

23,9 22,7 5,6 5,2 3,2 0,3 0,0 0,0

30,7 28,4 8,4 7,7 4,8 1,0 0,0 0,0

37,2 37,4 12,4 11,8 7,4 1,5 0,0 0,0

43,8 41,2 17,1 17,4 10,1 4,4 0,0 0,0

52,1 48,3 22,2 22,9 13,4 8,2 0,0 0,0

62,5 52,2 28,6 28,9 19,1 10,0 1,5 1,5

72,7 63,7 35,2 34,7 25,3 17,6 2,8 2,8

80,9 71,5 41,8 41,2 33,9 25,9 4,3 4,4

86,6 79,8 47,9 49,1 43,8 30,7 5,9 5,2

90,0 83,1 54,2 55,5 53,6 35,1 8,4 6,3

93,1 86,4 60,7 62,9 62,2 42,5 12,3 8,2

94,7 88,7 67,3 69,7 68,5 48,3 17,5 10,5

95,8 91,1 74,2 76,6 74,1 55,3 22,9 13,9

96,7 93,7 80,4 82,0 80,1 61,9 28,1 18,0

97,0 94,2 85,8 87,2 86,0 64,7 33,4 23,7

97,6 95,1 90,3 90,9 91,1 69,2 39,1 26,2

98,0 96,1 93,7 94,1 94,0 71,7 46,0 29,2

98,2 97,0 96,3 96,4 95,6 73,7 53,5 32,5

98,6 97,5 98,0 97,8 96,8 76,6 61,3 36,2

99,2 97,6 99,0 98,9 97,8 83,2 68,8 45,3

99,4 98,2 99,5 99,3 98,6 88,3 76,1 55,0

100,0 98,6 99,8 99,6 99,1 91,3 82,7 62,9

100,0 99,3 99,9 99,7 99,7 95,7 87,8 72,8

100,0 100,0 99,9 99,9 99,8 99,8 92,6 82,6

100,0 100,0 100,0 99,9 100,0 100,0 96,4 89,8

100,0 100,0 100,0 100,0 100,0 100,0 98,6 96,9

100,0 100,0 100,0 100,0 100,0 100,0 99,6 99,6

100,0 100,0 100,0 100,0 100,0 100,0 99,9 99,9

100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0

100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0

100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0

100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0

100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0

100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0

Unrestricted

Jan 18

Nov 15

1,3

0,5

Dez 17

Okt 15

0,5

0,0

Nov 17

Sep 15

0,0

0,0

Okt 17

Aug 15

0,0

0,0

Jun 16

Jul 15

0,0

0,0

Mai 15

0,0

0,0

Apr 15

0,0

Actual / Frcst

Mrz 15

Baseline

Feb 15

PROJECT Consortium

Jan 15

Jun 15

WTG

%

100,0%

4,6% 67,5% 8,3% 15,5%


s

EG1019 Burullus

Progress Curves (Rev. 0U)

Progress Curve Design Consortium 100,0 90,0 80,0 70,0 60,0 50,0 40,0 30,0 20,0 Baseline

10,0

Actual / Forecast

0,0

Note : All Cumulative (early dates)

Unrestricted

Mrz 15

Apr 15

Mai 15

Jun 15

Jul 15

Aug 15

Sep 15

Okt 15

Nov 15

Dez 15

Jan 16

Feb 16

Mrz 16

Apr 16

Mai 16

Jun 16

Jul 16

Aug 16

Sep 16

Okt 16

Nov 16

Dez 16

Jan 17

Feb 17

Mrz 17

Apr 17

Jun 17

Jul 17

Aug 17

Sep 17

Okt 17

Nov 17

Baseline

0,0

0,0

0,0

0,0

0,1

2,8

7,8

13,4

19,6

26,1

32,3

38,1

44,0

51,5

61,2

71,1

79,3

85,7

89,8

93,1

94,7

95,8

96,7

97,0

97,6

98,0

98,2

98,6

99,2

99,4

100,0

100,0

100,0

100,0

100,0

Actual / Frcst

0,0

0,0

0,0

0,0

0,1

2,6

7,7

12,9

17,7

22,7

28,4

37,4

41,2

48,3

52,2

63,7

71,5

79,8

83,1

86,4

88,7

91,1

93,7

94,2

95,1

96,1

97,0

97,5

97,6

98,2

98,6

99,3

100,0

100,0

100,0

Mai 17

Feb 15

Design Consortium

Jan 15

WTG

%

4,6%


s

EG1019 Burullus

Progress Curves (Rev. 0U)

Progress Curve Supply Consortium 100,0 90,0 80,0 70,0 60,0 50,0 40,0 30,0 20,0 Baseline

10,0

Actual / Forecast

0,0

Note : All Cumulative (early dates)

Unrestricted

Sep 17

Okt 17

35,2

41,8

47,9

54,2

60,7

67,3

74,2

80,4

85,8

90,3

93,7

96,3

98,0

99,0

99,5

99,8

99,9

99,9

100,0

100,0

100,0

100,0

28,9

34,7

41,2

49,1

55,5

62,9

69,7

76,6

82,0

87,2

90,9

94,1

96,4

97,8

98,9

99,3

99,6

99,7

99,9

99,9

100,0

100,0

100,0

Jan 18

Mai 17

28,7

22,9

Dez 17

Apr 17

22,5

17,4

Nov 17

Mrz 17

17,6

11,8

Aug 17

Sep 16

12,8

7,7

Jul 17

Aug 16

8,9

5,2

Jun 17

Jul 16

6,1

3,5

Feb 17

Dez 15

3,8

2,1

Jan 17

Nov 15

2,3

1,2

Dez 16

Okt 15

1,2

0,5

Nov 16

Sep 15

0,5

0,0

Okt 16

Aug 15

0,0

0,0

Jun 16

Jul 15

0,0

0,0

Mai 16

Jun 15

0,0

0,0

Apr 16

Mai 15

0,0

0,0

Mrz 16

Apr 15

0,0

Actual / Frcst

Feb 16

Mrz 15

Baseline

Jan 16

Feb 15

Supply Consortium

Jan 15

WTG

%

67,5%


s

EG1019 Burullus

Progress Curves (Rev. 0U)

Progress Curve Civil + Construction Consortium 100,0 90,0 80,0 70,0 60,0 50,0 40,0 30,0 20,0 Baseline

10,0

Actual / Forecast

0,0

Feb 16

Mrz 16

Jul 16

Aug 16

Sep 16

Okt 16

Nov 16

Dez 16

Jan 17

Feb 17

Mrz 17

Apr 17

Mai 17

Jun 17

Jul 17

Aug 17

Sep 17

Okt 17

Nov 17

Dez 17

Jan 18

Feb 18

9,0

12,3

15,8

19,6

23,6

27,6

34,0

42,5

51,2

59,7

67,2

73,4

79,6

85,6

91,1

94,0

95,6

96,8

97,8

98,6

99,1

99,7

99,8

100,0

100,0

100,0

100,0

100,0

0,3

1,0

1,5

4,4

8,2

10,0

17,6

25,9

30,7

35,1

42,5

48,3

55,3

61,9

64,7

69,2

71,7

73,7

76,6

83,2

88,3

91,3

95,7

99,8

100,0

100,0

100,0

100,0

100,0

Note : All Cumulative (early dates)

Unrestricted

Jun 16

Jan 16

6,3

0,0

Mai 16

Dez 15

3,6

0,0

Apr 16

Nov 15

2,0

0,0

Okt 15

1,0

0,0

Sep 15

0,6

0,0

Jul 15

0,0

0,0

Jun 15

0,0

0,0

Mai 15

0,0

0,0

Apr 15

0,0

0,0

Mrz 15

0,0

Actual / Frcst

Feb 15

Baseline

Jan 15

Civil + Construction Consortium

Aug 15

WTG

%

8,26%


s

EG1019 Burullus

Progress Curves (Rev. 0U)

Progress Curve M+E Erection Consortium 100,0 90,0 80,0 70,0 60,0 50,0 40,0 30,0 20,0 Baseline

10,0

Actual / Forecast

0,0

Note : All Cumulative (early dates)

Unrestricted

Aug 15

Sep 15

Okt 15

Nov 15

Dez 15

Jan 16

Feb 16

Mrz 16

Apr 16

Mai 16

Jun 16

Jul 16

Aug 16

Sep 16

Okt 16

Nov 16

Dez 16

Jan 17

Feb 17

Mrz 17

Apr 17

Mai 17

Jun 17

Jan 18

Feb 18

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

1,5

2,8

4,3

5,9

8,4

12,3

17,5

22,9

28,1

33,4

39,1

46,0

53,5

61,3

68,9

76,1

82,7

87,8

92,6

96,4

98,6

99,6

99,9

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

1,5

2,8

4,4

5,2

6,3

8,2

10,5

13,9

18,0

23,7

26,2

29,2

32,5

36,2

45,3

55,0

62,9

72,8

82,6

89,8

96,9

99,6

99,9

100,0

Dez 17

Jul 15

0,0

0,0

Nov 17

Jun 15

0,0

0,0

Okt 17

Mai 15

0,0

0,0

Sep 17

Apr 15

0,0

Actual / Frcst

Aug 17

Mrz 15

Baseline

Jul 17

Feb 15

M+E Erection Consortium

Jan 15

WTG

%

15,53%


s

EG1019 Burullus

Progress Curves (Rev. 0U)

Progress Curve Commissioning Consortium 100,0 90,0

80,0 70,0

60,0

50,0 40,0

30,0

20,0 Baseline

10,0

Actual / Forecast

0,0

Feb 15

Mrz 15

Apr 15

Mai 15

Jun 15

Jul 15

Aug 15

Sep 15

Okt 15

Nov 15

Dez 15

Jan 16

Feb 16

Mrz 16

Apr 16

Mai 16

Jun 16

Jul 16

Aug 16

Sep 16

Okt 16

Nov 16

Dez 16

Jan 17

Feb 17

Mrz 17

Apr 17

Mai 17

Jun 17

Jul 17

Aug 17

Sep 17

Okt 17

Nov 17

Dez 17

Jan 18

Feb 18

Mrz 18

Apr 18

Mai 18

Jun 18

Jul 18

Aug 18

Commissioning Consortium

Jan 15

WTG

Baseline

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,2

0,8

1,7

3,2

5,2

10,9

17,0

21,2

24,1

26,8

30,2

32,8

37,0

40,5

48,2

58,0

66,6

73,5

82,2

89,4

93,4

95,9

97,4

98,5

99,5

99,9

100,0

100,0

Actual / Frcst

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

2,4

17,6

20,1

22,2

25,2

27,1

34,9

37,0

37,9

43,1

52,8

65,1

71,7

79,4

88,1

92,1

93,6

95,8

97,4

98,8

99,5

100,0

Note : All Cumulative (early dates)

Unrestricted

%

4,07%


s

EG1019 Burullus

Breakdown

Progress Curves (Rev. 0U)

Unrestricted

Jul 15

Aug 15

Sep 15

Okt 15

Nov 15

Dez 15

Jan 16

Feb 16

Mrz 16

Apr 16

Mai 16

Jun 16

Jul 16

Aug 16

Sep 16

Okt 16

Nov 16

Dez 16

Jan 17

Feb 17

Mrz 17

Apr 17

Mai 17

Jun 17

Jul 17

Aug 17

Sep 17

Nov 17

Dez 17

Jan 18

Feb 18

Mrz 18

Apr 18

Mai 18

Jun 18

Jul 18

PROJECT Consortium

Baseline

0,0

0,0

0,0

0,0

0,0

0,5

1,3

2,3

3,8

5,8

8,2

11,4

15,2

19,2

24,4

29,8

35,4

40,8

46,3

52,3

58,3

64,6

70,4

75,5

80,1

83,8

87,0

89,5

91,7

93,4

95,0

96,3

97,4

98,3

99,0

99,5

99,7

99,8

99,9

99,9

100,0

100,0

100,0

Actual / Frcst

0,0

0,0

0,0

0,0

0,0

0,5

1,2

2,0

3,1

4,6

6,6

9,8

14,0

18,4

23,0

28,2

34,0

40,2

45,2

51,3

56,8

62,7

67,7

72,9

76,4

79,3

81,7

83,6

86,6

88,9

90,6

92,9

95,3

96,9

98,3

99,1

99,5

99,7

99,7

99,8

99,9

100,0

100,0

TOTAL Siemens TOTAL Orascom

Baseline Actual / Frcst Baseline Actual / Frcst

0,0

0,0

0,0

0,0

0,0

0,7

1,8

3,2

5,0

7,6

10,6

14,3

18,4

22,6

27,7

32,9

38,5

44,0

49,6

55,5

61,8

68,5

74,9

80,8

85,8

89,4

92,3

94,2

95,5

96,2

96,7

97,4

98,0

98,4

98,8

99,3

99,6

99,7

99,8

99,9

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,7

1,9

3,3

5,1

7,2

10,1

13,8

18,5

23,5

28,5

33,3

39,2

44,8

51,1

58,0

64,1

71,0

76,9

83,0

87,2

90,6

93,1

94,5

96,0

96,4

96,5

96,7

97,2

97,9

98,3

98,7

99,2

99,5

99,6

99,7

99,8

99,9

100,0

0,0

0,0

0,0

0,0

0,0

0,1

0,4

0,9

1,9

3,1

4,5

7,1

10,3

13,9

19,3

24,9

30,5

35,8

41,3

47,2

52,9

58,6

63,3

67,3

71,3

75,1

78,7

82,3

85,9

89,1

92,3

94,6

96,6

98,3

99,4

99,8

99,9

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,2

0,6

1,2

3,7

7,0

10,5

14,4

20,4

25,8

33,0

36,2

40,9

45,4

49,9

53,5

57,4

59,6

62,0

64,2

66,8

72,1

77,4

81,5

87,0

92,3

95,5

98,5

99,7

99,9

100,0

100,0

100,0

100,0

100,0

100,0

Design Siemens Design Orascom Supply Siemens Supply Orascom Civil Construction Orascom M-E Erection Siemens M-E Erection Orascom Commissioning Siemens Commissioning Orascom

Baseline Actual Baseline Actual Baseline Actual Baseline Actual Baseline Actual Baseline Actual Baseline Actual Baseline Actual Baseline Actual

0,0

0,0

0,0

0,0

0,5

8,8

24,9

41,4

57,0

69,0

77,7

82,4

84,8

87,3

89,8

91,7

93,9

95,5

96,8

97,8

98,6

99,2

99,8

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,5

8,4

24,3

41,2

56,3

67,7

76,1

80,9

84,3

87,5

89,1

90,8

91,1

92,2

93,0

93,8

94,6

95,2

96,0

96,8

97,7

98,3

98,9

99,4

99,8

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,5

2,5

6,5

11,5

17,8

25,3

35,2

48,2

61,7

72,7

81,2

86,7

91,0

93,0

94,2

95,3

95,6

96,5

97,1

97,4

98,0

98,8

99,1

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

2,1

6,6

17,5

21,4

30,3

35,3

51,3

62,5

74,1

78,5

83,0

86,0

89,2

92,7

93,1

93,9

95,1

96,1

96,6

96,6

97,4

97,9

99,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,6

1,4

2,4

4,0

6,5

9,6

13,4

17,8

22,3

27,8

33,4

39,5

45,4

51,4

57,8

64,5

71,5

78,0

84,2

89,4

93,2

96,2

98,1

99,2

99,7

99,9

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,6

1,4

2,5

4,0

6,1

9,0

12,9

18,0

23,3

28,7

33,9

40,3

46,3

53,1

60,6

67,3

74,6

81,0

86,6

91,0

94,6

97,1

98,4

99,5

99,8

99,9

99,9

99,9

99,9

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,5

1,5

3,0

4,3

5,6

10,3

16,5

23,3

33,0

43,8

52,7

59,9

67,3

74,6

80,8

87,4

91,5

93,3

94,8

95,9

96,7

97,4

98,0

98,6

99,1

99,4

99,6

99,8

99,9

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,1

0,2

0,7

1,2

1,5

6,5

14,7

21,2

29,7

38,3

45,7

62,0

67,1

73,8

80,9

86,0

86,9

89,7

90,2

91,9

93,4

95,3

96,2

97,0

97,9

98,8

99,6

99,8

99,9

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,6

1,0

2,0

3,6

6,3

9,0

12,3

15,8

19,6

23,6

27,6

34,0

42,5

51,2

59,7

67,2

73,4

79,6

85,6

91,1

94,0

95,6

96,8

97,8

98,6

99,1

99,7

99,8

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,3

1,0

1,5

4,4

8,2

10,0

17,6

25,9

30,7

35,1

42,5

48,3

55,3

61,9

64,7

69,2

71,7

73,7

76,6

83,2

88,3

91,3

95,7

99,8

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

2,2

4,4

6,5

13,1

26,0

36,7

41,4

43,9

46,4

54,9

61,6

62,3

67,2

77,5

84,0

86,6

90,9

94,0

95,2

95,8

99,2

100,0

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

8,5

6,0

10,4

5,8

14,2

33,3

37,5

37,5

37,5

39,0

55,1

68,5

79,4

90,5

92,6

92,6

96,7

98,7

98,7

98,7

99,7

99,7

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

1,5

2,8

4,3

5,9

8,4

12,2

17,2

22,7

27,9

33,2

38,9

45,8

53,4

61,2

68,8

76,0

82,7

87,8

92,6

96,4

98,6

99,6

99,9

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

1,5

2,8

4,3

5,2

6,3

8,3

10,5

13,7

17,8

23,5

26,1

29,1

32,2

35,8

44,9

54,6

62,5

72,6

82,4

89,7

96,9

99,6

99,9

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,3

0,8

1,9

6,9

13,4

17,3

19,6

21,8

25,3

27,7

31,2

34,7

42,0

52,9

62,8

69,8

78,9

87,4

91,9

95,0

96,8

98,2

99,3

99,9

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

2,0

18,4

21,0

22,9

25,8

27,9

36,3

37,4

37,8

40,8

49,4

62,3

68,6

76,4

85,3

90,2

92,1

94,8

96,7

98,5

99,4

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

1,0

4,0

7,5

13,1

19,2

27,8

32,1

37,6

43,1

47,3

50,6

53,8

61,0

64,8

74,0

79,2

82,1

89,0

95,9

98,0

99,4

100,0

100,0

100,0

100,0

100,0

100,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

0,0

4,2

14,3

16,3

19,3

22,6

23,4

28,8

35,5

38,5

52,8

67,0

77,0

84,9

92,0

99,4

100,0

100,0

100,0

100,0

100,0

100,0

Okt 17

Jun 15

Commissioning Consortium

Mai 15

M+E Erection Consortium

Apr 15

Civil + Construction Consortium

Mrz 15

Supply Consortium

Feb 15

Design Consortium

Jan 15

WTG

%

100,0% 60,7% 39,4%

1,4% 3,1% 55,7% 11,8% 8,3% 0,2% 15,3% 3,3% 0,8%


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Layout Name : EG1019_Level2

Activity Name

WHOLE PLANT / GENERAL ACTIVITIES Key Dates / Interface Events with Client General GENERAL

Dur.

Start

Finish

1568d

01-Apr-15 A

16-Jul-19

1568d

01-Apr-15 A

16-Jul-19

580d

01-Apr-15 A

01-Nov-16 A 01-Nov-16 A

580d

01-Apr-15 A

SI--U--5-01

ACCESS TO SITE FOR SOIL INVESTIGATION

0d

01-Apr-15 A

SI-----2A00

START OF PROJECT

0d

18-Mai-15 A

SI-----2C00

START ENGINEERING (SIEMENS)

0d

01-Jun-15 A

OC-----2C00

START ENGINEERING (CONSORTIUM PARTNER)

0d

28-Aug-15 A

SI----2-15

CUSTOMER KICK-OFF MEETING

0d

07-Sep-15 A

SI--U--5-02

FORMAL TAKING OVER OF SITE FROM CLIENT / ACCESS TO SITE

0d

15-Sep-15 A

SI----2-10

Start Date (EPC CONTRACT)

0d

31-Mrz-16 A

SI--EK-8-40

FUEL GAS REQUIRED

0d

09-Sep-16 A

SI--A--8-40

HV GRID REQUIRED (FOR BACK ENERGIZING)

0d

01-Nov-16 A

930d

29-Dez-16 A

145d

29-Dez-16 A

Block 4 UNIT 42

ACCESS TO SITE FOR SOIL INVESTIGATION START OF PROJECT START ENGINEERING (SIEMENS) START ENGINEERING (CONSORTIUM PARTNER) CUSTOMER KICK-OFF MEETING FORMAL TAKING OVER OF SITE FROM CLIENT / ACCESS TO SITE Start Date (EPC CONTRACT) FUEL GAS REQUIRED HV GRID REQUIRED (FOR BACK ENERGIZING) 16-Jul-19 22-Mai-17 A

SI42MKA9-40&

POWER TO THE GRID UNIT 42 (AMENDMENT I)

0d

29-Dez-16 A

SI42MB-9-95B

EARLY FINISH DATE G T42

0d

09-Mai-17 A

SI42MB-9-95

TOAC DATE GT42 (AMENDMENT I)

0d

22-Mai-17 A

118d

UNIT 41

22-Jan-17 A

POWER TO THE GRID UNIT 41 (AMENDMENT I)

0d

22-Jan-17 A

SI41MB-9-95B

EARLY FINISH DATE G T41

0d

18-Mai-17 A

SI41MB-9-95

TOAC DATE GT41 (AMENDMENT I)

0d

20-Mai-17 A

244d

14-Nov-18

POWER TO THE GRID BLOCK 40 (AMENDMENT I)

0d

14-Nov-18*

SI4---9-95B

EARLY FINISH DATE B LOCK 40

0d

25-Mrz-19

SI4---9-95

TOAC DATE BLOCK 40 (AMENDMENT I)

0d

16-Jul-19*

861d

13-Jan-17 A

109d

13-Jan-17 A

0d

13-Jan-17 A

SI32MB-9-95B

EARLY FINISH DATE G T32

0d

19-Apr-17 A

SI32MB-9-95

TOAC DATE GT32 (AMENDMENT I)

0d

02-Mai-17 A 15-Jan-17 A

POWER TO THE GRID UNIT 31 (AMENDMENT I)

0d

15-Jan-17 A

SI31MB-9-9B

EARLY FINISH DATE G T31

0d

18-Mai-17 A

SI31MB-9-95

TOAC DATE GT31 (AMENDMENT I)

0d

22-Mai-17 A

210d

25-Okt-18

POWER TO THE GRID BLOCK 30 (AMENDMENT I)

0d

25-Okt-18*

SI3---9-95B

EARLY FINISH DATE B LOCK 30

0d

04-Mrz-19

SI3---9-95

TOAC DATE BLOCK 30 (AMENDMENT I)

0d

23-Mai-19*

647d

31-Mai-17 A

243d

31-Mai-17 A

0d

31-Mai-17 A

SI22MB-9-95B

EARLY FINISH DATE G T22

0d

11-Sep-17

SI22MB-9-95

TOAC DATE GT22 (AMENDMENT I)

0d

29-Jan-18* 31-Mai-17 A

POWER TO THE GRID UNIT 21 (AMENDMENT I)

0d

31-Mai-17 A

SI21MB-9-95B

EARLY FINISH DATE G T21

0d

05-Sep-17

SI21MB-9-95

TOAC DATE GT21 (AMENDMENT I)

0d

30-Jan-18*

209d

11-Aug-18

TOAC DATE BLOCK 40 (AMENDMENT I)

POWER TO THE GRID UNIT 32 (AMENDMENT I) EARLY FINISH DATE G T32 TOAC DATE GT32 (AMENDMENT I)

POWER TO THE GRID UNIT 31 (AMENDMENT I) EARLY FINISH DATE G T31 TOAC DATE GT31 (AMENDMENT I)

POWER TO THE GRID BLOCK 30 (AMENDMENT I) EARLY FINISH DATE B LOCK 30 TOAC DATE BLOCK 30 (AMENDMENT I)

POWER TO THE GRID UNIT 22 (AMENDMENT I) EARLY FINISH DATE G T22 TOAC DATE GT22 (AMENDMENT I)

30-Jan-18

SI21MKA9-45&

UNIT 20

EARLY FINISH DATE BLOCK 40

29-Jan-18

POWER TO THE GRID UNIT 22 (AMENDMENT I)

245d

POWER TO THE GRID BLOCK 40 (AMENDMENT I)

08-Mrz-19

SI22MKA9-40&

UNIT 21

TOAC DATE GT41 (AMENDMENT I)

23-Mai-19

SI30MKA9-40&

Block 2 UNIT 22

EARLY FINISH DATE G T41

22-Mai-17 A

SI31MKA9-45&

UNIT 30

POWER TO THE GRID UNIT 41 (AMENDMENT I)

02-Mai-17 A

POWER TO THE GRID UNIT 32 (AMENDMENT I)

128d

TOAC DATE GT42 (AMENDMENT I)

23-Mai-19

SI32MKA9-40&

UNIT 31

EARLY FINISH DATE G T42

16-Jul-19

SI40MKA9-40&

Block 3 UNIT 32

POWER TO THE GRID UNIT 42 (AMENDMENT I)

20-Mai-17 A

SI41MKA9-45&

UNIT 40

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 1 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

POWER TO THE GRID UNIT 21 (AMENDMENT I) EARLY FINISH DATE G T21 TOAC DATE GT21 (AMENDMENT I)

08-Mrz-19

SI20MKA9-40&

POWER TO THE GRID BLOCK 20 (AMENDMENT I)

0d

11-Aug-18*

POWER TO THE GRID BLOCK 20 (AMENDMENT I)

SI2---9-95B

EARLY FINISH DATE B LOCK 20

0d

31-Dez-18

EARLY FINISH DATE B LOCK 20

SI2---9-95

TOAC DATE BLOCK 20 (AMENDMENT I)

0d

08-Mrz-19*

Block 1 UNIT 10

144d

15-Jul-18

06-Dez-18

144d

15-Jul-18

06-Dez-18

TOAC DATE BLOCK 20 (AMENDMENT I)

SI10MKA9-40&

POWER TO THE GRID BLOCK 10 (AMENDMENT I)

0d

15-Jul-18*

SI1---9-95B

EARLY FINISH DATE B LOCK 10

0d

06-Dez-18

EARLY FINISH DATE B LOCK 10

SI1---9-95

TOAC DATE BLOCK 10 (AMENDMENT I)

0d

06-Dez-18*

TOAC DATE BLOCK 10 (AMENDMENT I)

Time Impact I (By Owner) General GENERAL

38d

27-Jul-15 A

03-Sep-15 A

38d

27-Jul-15 A

03-Sep-15 A

38d

27-Jul-15 A

03-Sep-15 A

EE--U--5-03

OWNER'S INSTRUCTION TO STOP WORK (UNCLEAR SITE COORDINATES) 0d 27-Jul-15 A

EE--U--5-04

DOWN TIME

EE--U--5-05

OWNER'S VERBAL INSTRUCTION TO CONTINUE WORKS

Time Impact II (By Owner) General

POWER TO THE GRID BLOCK 10 (AMENDMENT I)

OWNER'S INSTRUCTION TO STOP WORK (UNCLEAR SITE COORDINATES)

38d

27-Jul-15 A

0d

03-Sep-15 A

35d

02-Sep-15 A

06-Okt-15 A

35d

02-Sep-15 A

06-Okt-15 A

DOWN TIME

02-Sep-15 A

OWNER'S VERBAL INSTRUCTION TO CONTINUE WORKS

ENGINEERING

ACTUAL

MANUFACTURING

CRITICAL

TRANSPORT

SUMMARY

ERECTION

BASELINE

Date

EG1019-0U

Integrated Project Schedule Burullus CCPP Project 4 x SCC5-8000 MS 2x1

CONSTRUCTION COMMISSIONING

Target1: Baseline Program; Target2: Impacted Baseline Program

Revision

Checked

Approved

12-01-16 Rev00 (Richt/Naguib/Naeem)

de Comtes/Nabil Hofmann/Morrison

03-Jun-... Rev0S (Richt/Nabil)

de Comtes/Nabil Huebinger/Morrison

07-Jul-17 Rev0T (Richt/Nabil)

de Comtes/Nabil Huebinger/Morrison

04-Aug... Rev0U (Richt/Nabil)

de Comtes/Nabil Huebinger/Morrison

PKZ: EG1019 DCC: &ABE020 HANDLING : RESTRICTED

/


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

GENERAL

Layout Name : EG1019_Level2 Dur.

Start

Finish

35d

02-Sep-15 A

06-Okt-15 A

0d

02-Sep-15 A

EE--U--5-06

OWNERS'S REQUEST (GIS RE-LOCATION)

EE--U--5-07

DOWN TIME

12d

02-Sep-15 A

EE--U--5-08

FIXED LOCATION OF GIS (OWNER'S CONFIRMATION OF COORDINATES) 0d

14-Sep-15 A

EE--U--5-09

SOIL INVESTIGATION / LAND FILL GIS AREA (RESULTING FROM RELOCATI 23d ON14-Sep-15 OF GIS) A

Terminal Points with Client General GENERAL

OWNERS'S REQUEST (GIS RE-LOCATION) 13-Sep-15 A

541d

01-Jun-15 A

23-Nov-16 A

541d

01-Jun-15 A

23-Nov-16 A

541d

01-Jun-15 A

23-Nov-16 A

TERMINAL POINT FOR WATER DISCHARGE AVAILABLE

0d

01-Jun-15 A

SI--EKG6A40

TERMINAL POINT GAS READY FOR CONNECTION

0d

18-Aug-16 A

SI--GA-6-40

TERMINAL POINT RAW WATER GA READY FOR CONNECTION

0d

23-Nov-16 A

0d

13-Dez-16 A

13-Dez-16 A

0d

13-Dez-16 A

13-Dez-16 A

0d

13-Dez-16 A

13-Dez-16 A

0d

13-Dez-16 A

849d

25-Apr-15 A

20-Aug-17

849d

25-Apr-15 A

20-Aug-17

849d

25-Apr-15 A

20-Aug-17

849d

25-Apr-15 A

20-Aug-17

100d

12-Mai-15 A

20-Aug-15 A

100d

12-Mai-15 A

20-Aug-15 A

100d

12-Mai-15 A

20-Aug-15 A

34d

12-Mai-15 A

15-Jun-15 A

0d

20-Aug-15 A

762d

16-Jul-15 A

15-Aug-17

762d

16-Jul-15 A

15-Aug-17

762d

16-Jul-15 A

15-Aug-17

81d

16-Jul-15 A

05-Okt-15 A

General GENERAL SI--B--8-50&

MV AVAILABLE (BACK ENERGIZING)

Site Mobilization General GENERAL OC--U--5-10#

PREPARATION JOB SITE, CONSTRUCTION SITE INSTALLATION

Civil Studies General GENERAL OC--3415-15

SOIL INVESTIGATION WORKS

OC--3412-22

SOIL INVESTIGATION REPORT AVAILABLE

General Site Civil Work General GENERAL

DOWN TIME FIXED LOCATION OF GIS (OWNER'S CONFIRMATION OF COORDINATES)

06-Okt-15 A

SI--GM-6B40

Key Dates Electrical/ I&C

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 2 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

SOIL INVESTIGATION / LAND FILL GIS AREA (RESULTING FROM RELOCATION OF GIS)

TERMINAL POINT FOR WATER DISCHARGE AVAILABLE TERMINAL POINT GAS READY FOR CONNECTION TERMINAL POINT RAW WATER GA READY FOR CONNECTION

MV AVAILABLE (BACK ENERGIZING)

PREPARATION JOB SITE, CONSTRUCTION SITE INSTALLATION

SOIL INVESTIGATION WORKS SOIL INVESTIGATION REPORT AVAILABLE

OC-U--5-25#1

SITE LEVELING AND BACKFILLING GIS B UILDING

OC-U--5-25#2

SITE LEVELING AND BACKFILLING BLOCK 4

212d

01-Aug-15 A

29-Feb-16 A

SITE LEVELING AND BACKFILLING BLOCK 4

OC-U--5-25#3

SITE LEVELING AND BACKFILLING BLOCK 3

167d

15-Sep-15 A

29-Feb-16 A

SITE LEVELING AND BACKFILLING BLOCK 3

OC-U--5-25#4

SITE LEVELING AND BACKFILLING BOP

382d

04-Nov-15 A

20-Nov-16 A

OC-U--5-25#5

SITE LEVELING AND BACKFILLING BLOCK 2

115d

04-Nov-15 A

27-Feb-16 A

SITE LEVELING AND BACKFILLING BLOCK 2

OC-U--5-25#6

SITE LEVELING AND BACKFILLING BLOCK 1

100d

19-Nov-15 A

27-Feb-16 A

SITE LEVELING AND BACKFILLING BLOCK 1

OC00UBZ5H10

DUCTING STRUCUTRE PART 11/11 SUMMARY

192d

13-Mrz-16 A

21-Sep-16 A

OC00UBZ5H

DUCTING STRUCUTRE PART 1/11 SUMMARY

481d

24-Mrz-16 A

18-Jul-17 A

OC00UBZ5H5

DUCTING STRUCUTRE PART 6/11 SUMMARY

294d

27-Mrz-16 A

15-Jan-17 A

OC00UBZ5H1

DUCTING STRUCUTRE PART 2/11 SUMMARY

364d

06-Apr-16 A

05-Apr-17 A

OC00UBZ5H4

DUCTING STRUCUTRE PART 5/11 SUMMARY

492d

11-Apr-16 A

15-Aug-17

OC00UBZ5H3

DUCTING STRUCUTRE PART 4/11 SUMMARY

256d

13-Apr-16 A

25-Dez-16 A

OC00UBZ5H2

DUCTING STRUCUTRE PART 3/11 SUMMARY

273d

04-Mai-16 A

01-Feb-17 A

OC00UBZ5H8

DUCTING STRUCUTRE PART 9/11 SUMMARY

288d

02-Jul-16 A

15-Apr-17 A

OC00UBZ5H6

DUCTING STRUCUTRE PART 7/11 SUMMARY

297d

18-Jul-16 A

10-Mai-17 A

OC00UBZ5H9

DUCTING STRUCUTRE PART 10/11 SUMMARY

272d

26-Jul-16 A

24-Apr-17 A

OC00UBZ5H7

DUCTING STRUCUTRE PART 8/11 SUMMARY

328d

27-Jul-16 A

20-Jun-17 A

64d

01-Aug-16 A

03-Okt-16 A

COMMON OC00UBZ5H18

DUCTING STRUCUTRE AREA 5 - 6

Block 4 GENERAL

64d

01-Aug-16 A

03-Okt-16 A

186d

13-Apr-16 A

16-Okt-16 A

SITE LEVELING AND BACKFILLING GIS BUILDING

SITE LEVELING AND BACKFILLING BOP

DUCTING STRUCUTRE PART 11/11 SUMMARY DUCTING STRUCUTRE PART 1/11 SUMMARY DUCTING STRUCUTRE PART 6/11 SUMMARY DUCTING STRUCUTRE PART 2/11 SUMMARY DUCTING STRUCUTRE PART 5/11 SUMMARY DUCTING STRUCUTRE PART 4/11 SUMMARY DUCTING STRUCUTRE PART 3/11 SUMMARY DUCTING STRUCUTRE PART 9/11 SUMMARY DUCTING STRUCUTRE PART 7/11 SUMMARY DUCTING STRUCUTRE PART 10/11 SUMMARY DUCTING STRUCUTRE PART 8/11 SUMMARY

DUCTING STRUCUTRE AREA 5 - 6

186d

13-Apr-16 A

16-Okt-16 A

OC00UBZ5H11

DUCTING STRUCUTRE AREA 1

177d

13-Apr-16 A

07-Okt-16 A

DUCTING STRUCUTRE AREA 1

OC00UBZ5H19

DUCTING STRUCUTRE AREA 4

182d

13-Apr-16 A

12-Okt-16 A

DUCTING STRUCUTRE AREA 4

OC00UBZ5H20

DUCTING STRUCUTRE AREA 7

186d

13-Apr-16 A

16-Okt-16 A

DUCTING STRUCUTRE AREA 7

178d

04-Mai-16 A

29-Okt-16 A

Block 3 GENERAL

178d

04-Mai-16 A

29-Okt-16 A

OC00UBZ5H21

DUCTING STRUCUTRE AREA 2

169d

04-Mai-16 A

20-Okt-16 A

OC00UBZ5H22

DUCTING STRUCUTRE AREA 8

178d

04-Mai-16 A

29-Okt-16 A

525d

06-Okt-15 A

14-Mrz-17 A

525d

06-Okt-15 A

14-Mrz-17 A

525d

06-Okt-15 A

14-Mrz-17 A

525d

06-Okt-15 A

14-Mrz-17 A

183d

09-Mrz-17 A

07-Sep-17

183d

09-Mrz-17 A

07-Sep-17

183d

09-Mrz-17 A

07-Sep-17

7d

09-Mrz-17 A

15-Mrz-17 A

96d

05-Apr-17 A

10-Jul-17 A

121d

10-Mai-17 A

07-Sep-17

348d

21-Aug-17

03-Aug-18

348d

21-Aug-17

03-Aug-18

348d

21-Aug-17

03-Aug-18

320d

21-Aug-17

06-Jul-18

28d

07-Jul-18*

03-Aug-18

1099d

01-Jun-15 A

03-Jun-18

301d

05-Sep-15 A

02-Jul-16 A

91d

05-Sep-15 A

04-Dez-15 A

Piling for Entire Plant General GENERAL OC--U--5-00#

PILING WHOLE PLANT

Civil Works UYE General COMMON OC00UYE5-15

CONSTRUCTION FOUNDATION UYE

OC00UYE5C15

CONSTRUCTION MASONRY UYE

OC00UYE5D15

CONSTRUCTION FINISHING WORKS UYE

Roads, Parking Area, Walkways, Hardstanding areas UZA General COMMON OC00UZA5-16

EXECUTION ROADS AND DRAINAGE UZA

OC00UZA5D15

FINISHING WORKS UZA

GAS TURBINE AREA Turboset Foundation UMB General

DUCTING STRUCUTRE AREA 2 DUCTING STRUCUTRE AREA 8

PILING WHOLE PLANT

CONSTRUCTION FOUNDATION UYE CONSTRUCTION MASONRY UYE CONSTRUCTION FINISHING WORKS UYE

EXECUTION ROADS AND DRAINAGE UZA FINISHING WORKS UZA


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

Dur.

Start

Finish

91d

05-Sep-15 A

04-Dez-15 A

DETAIL DESIGN, CHECKER CONCRETE STRUCTURE TS FOUNDATION 91d UMB 05-Sep-15 A

04-Dez-15 A

GENERAL SI--UMB2A70

Layout Name : EG1019_Level2

66d

15-Dez-15 A

19-Feb-16 A

46d

04-Jan-16 A

19-Feb-16 A

46d

04-Jan-16 A

19-Feb-16 A

0d

16-Jan-16 A

51d

15-Dez-15 A

04-Feb-16 A

51d

15-Dez-15 A

04-Feb-16 A

0d

31-Dez-15 A

51d

02-Jan-16 A

22-Feb-16 A

44d

02-Jan-16 A

15-Feb-16 A

44d

02-Jan-16 A

15-Feb-16 A

0d

18-Jan-16 A

38d

15-Jan-16 A

22-Feb-16 A

38d

15-Jan-16 A

22-Feb-16 A

0d

28-Jan-16 A

86d

22-Feb-16 A

18-Mai-16 A

61d

22-Feb-16 A

23-Apr-16 A

61d

22-Feb-16 A

23-Apr-16 A

0d

04-Mrz-16 A

34d

14-Apr-16 A

18-Mai-16 A

34d

14-Apr-16 A

18-Mai-16 A

0d

19-Apr-16 A

82d

11-Apr-16 A

02-Jul-16 A

71d

11-Apr-16 A

21-Jun-16 A

71d

11-Apr-16 A

21-Jun-16 A

0d

22-Apr-16 A

61d

02-Mai-16 A

02-Jul-16 A

61d

02-Mai-16 A

02-Jul-16 A

0d

12-Mai-16 A

680d

06-Okt-15 A

15-Aug-17

51d

06-Okt-15 A

26-Nov-15 A

51d

06-Okt-15 A

26-Nov-15 A

51d

06-Okt-15 A

26-Nov-15 A

24-Nov-15 A

30-Apr-17 A

OC4-UMB5-15#

523d 7h 510d 7h SUMMARY BUILDING FOUNDATION 41/42UMB (INCL.EXCAVATION) 79d

OC4-UMB5-10

(H) START PLACING FORMWORK BUILD.FOUNDATION 41/42UMB

16-Jan-16 A

OC4-UMB5C55

(RFE) READY FOR E-ERECTION, BUILDING CLOSED 41/42UMB

Block 4 UNIT 42 OC42UMB5A15#

SUMMARY TURBOSET FOUNDATION 42UMB (INCL.E XCAVATION)

OC42UMB5A10

(H) START PLACING FORMWORK GT- SET FOUNDATION 42UMB

UNIT 41 OC41UMB5A15#

SUMMARY TURBOSET FOUNDATION 41UMB (INCL.E XCAVATION)

OC41UMB5A10

(H) START PLACING FORMWORK GT- SET FOUNDATION 41UMB

Block 3 UNIT 32 OC32UMB5A15#

SUMMARY TURBOSET FOUNDATION 32UMB (INCL.E XCAVATION)

OC32UMB5A10

(H) START PLACING FORMWORK GT- SET FOUNDATION 32UMB

UNIT 31 OC31UMB5A15#

SUMMARY TURBOSET FOUNDATION 31UMB (INCL.E XCAVATION)

OC31UMB5A10

(H) START PLACING FORMWORK GT- SET FOUNDATION 31UMB

Block 2 UNIT 22 OC22UMB5A15#

SUMMARY TURBOSET FOUNDATION 22UMB (INCL.E XCAVATION)

OC22UMB5A10

(H) START PLACING FORMWORK GT- SET FOUNDATION 22UMB

UNIT 21 OC21UMB5A15#

SUMMARY TURBOSET FOUNDATION 21UMB (INCL.E XCAVATION)

OC21UMB5A10

(H) START PLACING FORMWORK GT- SET FOUNDATION 21UMB

Block 1 UNIT 11 OC11UMB5A15#

SUMMARY TURBOSET FOUNDATION 11UMB (INCL.EXCAVATION)

OC11UMB5A10

(H) START PLACING FORMWORK GT- SET FOUNDATION 11UMB

UNIT 12 OC12UMB5A15#

SUMMARY TURBOSET FOUNDATION 12UMB (INCL.E XCAVATION)

OC12UMB5A10

(H) START PLACING FORMWORK GT- SET FOUNDATION 12UMB

Civil Works UMB General GENERAL OC--UMB2-70

Block 4 GENERAL

DETAIL DESIGN, CHECKER CONCRETE STRUCTURE UMB

UNIT 42

0d

OC42UMB5B25

ERECTION STEEL STRUCTURE ANNEX 42UMB

117d

01-Mrz-16 A

25-Jun-16 A

OC42UMB5C15

WALL AND ROOF CLADDING 42UMB

324d

15-Mai-16 A

04-Apr-17 A

OC42UMB5I26

ERECTION STEEL STRUCTURE FILTERHOUSE 42UMB

14d

18-Jul-16 A

01-Aug-16 A

OC42UMB5E15#

SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 42UMB

134d

23-Jul-16 A

03-Dez-16 A

OC42UMB5C45

(RFE) ROOF CLOSED 42UMB [EXCEPT SMALL PORTION OF EAST SIDE]0d

15-Aug-16 A

OC42SMM8B70

(CCC) CRANE SMM04 IN 41/42UMB READY (200t)

15-Sep-16 A

414d

15-Feb-16 A

04-Apr-17 A

ERECTION STEEL STRUCTURE CRANE WALKWAY 41UMB

132d

15-Feb-16 A

25-Jun-16 A

OC41UMB5B25

ERECTION STEEL STRUCTURE ANNEX 41UMB

117d

01-Mrz-16 A

25-Jun-16 A

OC41UMB5C15

WALL AND ROOF CLADDING 41UMB

324d

15-Mai-16 A

04-Apr-17 A

OC41UMB5E15#

SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 41UMB

75d

23-Jul-16 A

06-Okt-16 A

OC41UMB5I25

ERECTION STEEL STRUCTURE FILTERHOUSE 41UMB

13d

23-Jul-16 A

05-Aug-16 A

OC41UMB5C45

(RFE) ROOF CLOSED 41UMB [EXCEPT SMALL PORTION OF EAST SIDE]0d

15-Aug-16 A

513d

30-Nov-15 A

25-Apr-17 A

444d

07-Dez-15 A

23-Feb-17 A

88d

07-Dez-15 A

04-Mrz-16 A

0d

23-Dez-15 A

0d

23-Feb-17 A

513d

30-Nov-15 A

OC3-UMB5C55

(RFE) READY FOR E-ERECTION, BUILDING CLOSED 31/32UMB

ERECTION STEEL STRUCTURE ANNEX 42UMB WALL AND ROOF CLADDING 42UMB ERECTION STEEL STRUCTURE FILTERHOUSE 42UMB SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 42UMB

(CCC) CRANE SMM04 IN 41/42UMB READY (200t)

ERECTION STEEL STRUCTURE CRANE WALKWAY 41UMB ERECTION STEEL STRUCTURE ANNEX 41UMB WALL AND ROOF CLADDING 41UMB SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 41UMB ERECTION STEEL STRUCTURE FILTERHOUSE 41UMB

SUMMARY BUILDING FOUNDATION 31/32UMB (INCL.EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION 31/32UMB (RFE) READY FOR E-ERECTION, BUILDING CLOSED 31/32UMB

25-Apr-17 A

FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE 183dCRANE 30-Nov-15 WALKW. A UMB 31-Mai-16 BLOCK A 3

OC32UMB5B15

ERECTION STEEL STRUCTURE CRANE WALKWAY 32UMB

137d

09-Mrz-16 A

24-Jul-16 A

OC32UMB5B25

ERECTION STEEL STRUCTURE ANNEX 32UMB

112d

02-Apr-16 A

23-Jul-16 A

OC32UMB5C15

WALL AND ROOF CLADDING 32UMB

311d

19-Jun-16 A

25-Apr-17 A

OC32UMB5I26

ERECTION STEEL STRUCTURE FILTERHOUSE 32UMB

22d

30-Jul-16 A

21-Aug-16 A

OC32UMB5E15#

SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 32UMB

117d

06-Aug-16 A

30-Nov-16 A

OC32SMM8B70

(CCC) CRANE SMM04 IN 31/32UMB (26t)

OC32UMB5C45

(RFE) ROOF CLOSED 32UMB

UNIT 31

ERECTION STEEL STRUCTURE CRANE WALKWAY 42UMB

(RFE) ROOF CLOSED 41UMB [EXCEPT SMALL PORTION OF EAST SIDE]

OC--UMB3B27

0d

FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE CRANE WALKW. UMB BLOCK 4

(RFE) ROOF CLOSED 42UMB [EXCEPT SMALL PORTION OF EAST SIDE]

OC41UMB5B15

UNIT 32

SUMMARY BUILDING FOUNDATION 41/42UMB (INCL.EXCAVATION)

(RFE) READY FOR E-ERECTION, BUILDING CLOSED 41/42UMB

23-Jul-16 A

(H) START PLACING FORMWORK BUILD.FOUNDATION 31/32UMB

DETAIL DESIGN, CHECKER CONCRETE STRUCTURE UMB

04-Apr-17 A

15-Feb-16 A

SUMMARY BUILDING FOUNDATION 31/32UMB (INCL.EXCAVATION)

SUMMARY TURBOSET FOUNDATION 12UMB (INCL.EXCAVATION)

(H) START PLACING FORMWORK BUILD.FOUNDATION 41/42UMB

159d

OC32UMB5-10

SUMMARY TURBOSET FOUNDATION 11UMB (INCL.EXCAVATION)

(H) START PLACING FORMWORK GT- SET FOUNDATION 12UMB

ERECTION STEEL STRUCTURE CRANE WALKWAY 42UMB

OC32UMB5-15#

SUMMARY TURBOSET FOUNDATION 21UMB (INCL.EXCAVATION)

(H) START PLACING FORMWORK GT- SET FOUNDATION 11UMB

FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE 172dCRANE 24-Nov-15 WALKW. A UMB 14-Mai-16 BLOCK A 4

Block 3 GENERAL

SUMMARY TURBOSET FOUNDATION 22UMB (INCL.EXCAVATION)

(H) START PLACING FORMWORK GT- SET FOUNDATION 21UMB

OC42UMB5B15

0d

SUMMARY TURBOSET FOUNDATION 31UMB (INCL.EXCAVATION)

(H) START PLACING FORMWORK GT- SET FOUNDATION 22UMB

OC--UMB3B26

UNIT 41

SUMMARY TURBOSET FOUNDATION 32UMB (INCL.EXCAVATION)

(H) START PLACING FORMWORK GT- SET FOUNDATION 31UMB

30-Apr-17 A

30-Apr-17 A

SUMMARY TURBOSET FOUNDATION 41UMB (INCL.EXCAVATION)

(H) START PLACING FORMWORK GT- SET FOUNDATION 32UMB

24-Feb-16 A

24-Nov-15 A

SUMMARY TURBOSET FOUNDATION 42UMB (INCL.EXCAVATION)

(H) START PLACING FORMWORK GT- SET FOUNDATION 41UMB

07-Dez-15 A

0d

DETAIL DESIGN, CHECKER CONCRETE STRUCTURE TS FOUNDATION UMB

(H) START PLACING FORMWORK GT- SET FOUNDATION 42UMB

07-Dez-15 A

497d

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 3 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

15-Sep-16 A

0d

10-Feb-17 A

413d

09-Mrz-16 A

25-Apr-17 A

FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE CRANE WALKW. UMB BLOCK 3 ERECTION STEEL STRUCTURE CRANE WALKWAY 32UMB ERECTION STEEL STRUCTURE ANNEX 32UMB WALL AND ROOF CLADDING 32UMB ERECTION STEEL STRUCTURE FILTERHOUSE 32UMB SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 32UMB (CCC) CRANE SMM04 IN 31/32UMB (26t) (RFE) ROOF CLOSED 32UMB

OC31UMB5B15

ERECTION STEEL STRUCTURE CRANE WALKWAY 31UMB

137d

09-Mrz-16 A

24-Jul-16 A

OC31UMB5B25

ERECTION STEEL STRUCTURE ANNEX 31UMB

112d

02-Apr-16 A

23-Jul-16 A

OC31UMB5C15

WALL AND ROOF CLADDING 31UMB

311d

19-Jun-16 A

25-Apr-17 A

OC31UMB5I25

ERECTION STEEL STRUCTURE FILTERHOUSE 31UMB

24d

07-Aug-16 A

31-Aug-16 A

ERECTION STEEL STRUCTURE CRANE WALKWAY 31UMB ERECTION STEEL STRUCTURE ANNEX 31UMB WALL AND ROOF CLADDING 31UMB ERECTION STEEL STRUCTURE FILTERHOUSE 31UMB


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Layout Name : EG1019_Level2

Activity Name

Dur.

Start

Finish

OC31UMB5E15#

SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 31UMB

122d

07-Aug-16 A

06-Dez-16 A

OC31UMB5C45

(RFE) ROOF CLOSED 31UMB

0d

10-Feb-17 A

563d

26-Jan-16 A

10-Aug-17

434d

22-Feb-16 A

01-Mai-17 A

95d

22-Feb-16 A

26-Mai-16 A

0d

03-Apr-16 A

Block 2 GENERAL OC2-UMB5-15#

SUMMARY BUILDING FOUNDATION 21/22UMB (INCL.EXCAVATION)

OC2-UMB5-10

(H) START PLACING FORMWORK BUILD.FOUNDATION 21/22UMB

OC2-UMB5C55

(RFE) READY FOR E-ERECTION, BUILDING CLOSED 21/22UMB

UNIT 22

0d

01-Mai-17 A

563d

26-Jan-16 A

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 4 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 31UMB (RFE) ROOF CLOSED 31UMB

SUMMARY BUILDING FOUNDATION 21/22UMB (INCL.EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION 21/22UMB (RFE) READY FOR E-ERECTION, BUILDING CLOSED 21/22UMB

10-Aug-17 FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE CRANE WALKW. UMB BLOCK 2

OC--UMB3B28

FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE 233dCRANE 26-Jan-16 WALKW. A UMB 15-Sep-16 BLOCK 2 A

OC22UMB5B15

ERECTION STEEL STRUCTURE INCL. CRANE WALKWAY 22UMB

305d

22-Mai-16 A

22-Mrz-17 A

OC22UMB5B25

ERECTION STEEL STRUCTURE ANNEX 22UMB

199d

22-Mai-16 A

07-Dez-16 A

OC22UMB5C15

WALL AND ROOF CLADDING 22UMB

269d

15-Nov-16 A

10-Aug-17

OC22UMB5E15#

SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 22UMB

103d

07-Jan-17 A

19-Apr-17 A

OC22UMB5I26

PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 22UMB 29d

07-Feb-17 A

08-Mrz-17 A

PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 22UMB

OC22SMM8B70

(CCC) CRANE SMM04 IN 21/22UMB (26t)

0d

09-Mrz-17 A

(CCC) CRANE SMM04 IN 21/22UMB (26t)

OC22UMB5C45

(RFE) ROOF CLOSED 22UMB

0d

25-Mrz-17 A

446d

22-Mai-16 A

UNIT 21

(RFE) ROOF CLOSED 22UMB

ERECTION STEEL STRUCTURE INCL. CRANE WALKWAY 21UMB

302d

22-Mai-16 A

19-Mrz-17 A

OC21UMB5B25

ERECTION STEEL STRUCTURE ANNEX 21UMB

134d

18-Aug-16 A

30-Dez-16 A

OC21UMB5C15

WALL AND ROOF CLADDING 21UMB

269d

15-Nov-16 A

10-Aug-17

OC21UMB5E15#

SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 21UMB

103d

07-Jan-17 A

19-Apr-17 A

OC21UMB5I25

PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 21UMB 17d

19-Feb-17 A

08-Mrz-17 A

OC21UMB5C45

(RFE) ROOF CLOSED 21UMB

0d

18-Apr-17 A

568d

26-Jan-16 A

ERECTION STEEL STRUCTURE INCL. CRANE WALKWAY 21UMB ERECTION STEEL STRUCTURE ANNEX 21UMB WALL AND ROOF CLADDING 21UMB SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 21UMB PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 21UMB (RFE) ROOF CLOSED 21UMB

15-Aug-17

414d

04-Apr-16 A

23-Mai-17 A

OC1-UMB5-15#

SUMMARY BUILDING FOUNDATION 11/12UMB (INCL.EXCAVATION)

74d

04-Apr-16 A

17-Jun-16 A

OC1-UMB5-10

(H) START PLACING FORMWORK BUILD.FOUNDATION 11/12UMB

0d

13-Apr-16 A

OC12UMB5C55

(RFE) READY FOR E-ERECTION, BUILDING CLOSED 11/12UMB

0d

23-Feb-17 A

OC12SMM8B70

(CCC) CRANE SMM04 IN 11/12UMB (26t)

0d

UNIT 11

WALL AND ROOF CLADDING 22UMB SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 22UMB

10-Aug-17

OC21UMB5B15

Block 1 GENERAL

ERECTION STEEL STRUCTURE INCL. CRANE WALKWAY 22UMB ERECTION STEEL STRUCTURE ANNEX 22UMB

SUMMARY BUILDING FOUNDATION 11/12UMB (INCL.EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION 11/12UMB (RFE) READY FOR E-ERECTION, BUILDING CLOSED 11/12UMB

23-Mai-17 A

408d

28-Jun-16 A

09-Aug-17

(CCC) CRANE SMM04 IN 11/12UMB (26t)

OC11UMB5B15

ERECTION STEEL STRUCTURE CRANE WALKWAY 11UMB

336d

28-Jun-16 A

29-Mai-17 A

OC11UMB5B25

ERECTION STEEL STRUCTURE ANNEX 11UMB

220d

12-Aug-16 A

19-Mrz-17 A

OC11UMB5C15

WALL AND ROOF CLADDING 11UMB

187d

04-Feb-17 A

09-Aug-17

OC11UMB5C45

(RFE) ROOF CLOSED 11UMB

0d

28-Apr-17 A

OC11UMB5E15#

SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 11UMB

91d

07-Mai-17 A

05-Aug-17

OC11UMB5B47

CUTTING REMAINING STEEL BARS ANNEX 11UMB

7d

19-Mai-17 A

25-Mai-17 A

CUTTING REMAINING STEEL BARS ANNEX 11UMB

OC11UMB5I25

PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 11UMB 5d

19-Mai-17 A

24-Mai-17 A

PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 11UMB

568d

26-Jan-16 A

15-Aug-17

UNIT 12

FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE 247dCRANE 26-Jan-16 WALKW. A UMB 28-Sep-16 BLOCK 1 A

OC12UMB5B15

ERECTION STEEL STRUCTURE CRANE WALKWAY 12UMB

336d

28-Jun-16 A

29-Mai-17 A

OC12UMB5B25

ERECTION STEEL STRUCTURE ANNEX 12UMB

217d

02-Aug-16 A

06-Mrz-17 A

OC12UMB5C15

WALL AND ROOF CLADDING 12UMB

193d

04-Feb-17 A

15-Aug-17

OC12UMB5B46

CUTTING REMAINING STEEL BARS ANNEX 12UMB

7d

25-Apr-17 A

01-Mai-17 A

OC12UMB5C45

(RFE) ROOF CLOSED 12UMB

0d

28-Apr-17 A

OC12UMB5E15#

SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 12UMB

89d

09-Mai-17 A

05-Aug-17

OC12UMB5I26

PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 12UMB 5d

19-Mai-17 A

24-Mai-17 A

881d

01-Jun-15 A

28-Okt-17

767d

01-Jun-15 A

06-Jul-17 A

Block 4 UNIT 42

WALL AND ROOF CLADDING 11UMB (RFE) ROOF CLOSED 11UMB

OC--UMB3B29

Gas Turbine MB-

ERECTION STEEL STRUCTURE CRANE WALKWAY 11UMB ERECTION STEEL STRUCTURE ANNEX 11UMB

SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 11UMB

FABRICATION DESIGN / FABRICATION / TRANSPORT STEEL STRUCTURE CRANE WALKW. UMB BLOCK 1 ERECTION STEEL STRUCTURE CRANE WALKWAY 12UMB ERECTION STEEL STRUCTURE ANNEX 12UMB WALL AND ROOF CLADDING 12UMB CUTTING REMAINING STEEL BARS ANNEX 12UMB (RFE) ROOF CLOSED 12UMB SUMMARY ERECTION STEEL PLATFORMS ( LOT1/2) 12UMB PRE ASSEMBLY & ERECTION STEEL STRUCTURE FILTERHOUSE 12UMB

767d

01-Jun-15 A

06-Jul-17 A

SP42MB-3-25

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 42MB- 303d

01-Jun-15 A

29-Mrz-16 A

SI42MBA4-25

TRANSPORT GT42 MB NS P - SITE

26d

24-Apr-16 A

20-Mai-16 A

OC42MB-6-20#

SUMMARY INS TALLATION GT42

188d

18-Mai-16 A

22-Nov-16 A

SI42MB-6-10

PLACING GT42

0d

10-Jun-16 A

OC42MB-6-55

OIL FLUSHING AND RE-INSTATEMENT GT 42

31d

19-Aug-16 A

19-Sep-16 A

SI42MB-8-25#

COLD COMMISSIONING GT42 / AUXILIARIES

30d

26-Nov-16 A

25-Dez-16 A

SI42MB-9-05

1ST. TURNING GEAR GT42

0d

26-Dez-16 A

SI42MBY9-36

SYSTEM CHECK BY SIEMENS GT42

0d

26-Dez-16 A

26-Dez-16 A

SI42MKA9-10

START UP TES T WITH MBJ 42MBA/SFC COMMISSIONING / MBP GAS FILLING 1d 27-Dez-16 A

27-Dez-16 A

START UP TES T WITH MBJ 42MBA/SFC COMMISSIONING / MBP GAS FILLING

SI42MBY9-35

GT PROTECTION GT42

1d

27-Dez-16 A

27-Dez-16 A

GT PROTECTION GT42

SI42MB-9-15

1ST. IGNITION GT42

0d

28-Dez-16 A

SI42MKA9-40

1ST. SYNCHRONIZATION GT GENERATOR 42MKA (POWER TO THE GRID) 0d

SI42MB-9-00

HOT COMMISSIONING GT42 / OPEN CYCLE

7d

08-Feb-17 A

15-Feb-17 A

SI42MBA9-70

OPTIMIZING UNIT 42

0d

15-Feb-17 A

15-Feb-17 A

SI42MB-9-001

OUTAGE (PRIOR TO PERFORMANCE TEST)

12d

18-Feb-17 A

01-Mrz-17 A

SI42MBA9-80

PERFORMANCE TEST GT 42

SI42MB-9-002

OUTAGE (PRIOR TO READY FOR RELIABILTY RUN)

SI42MB-9-005

BALANCING LOADS GT42

SI42MB-9-004

OUTAGE (RELIABILITY RUN - WAITING FOR OWNER GO AHEAD)

SI42MB-9-003

UNIT 42 READY FOR RELIAB ILITY RUN

SI42MBA9-90 SI42OC-9-44

UNIT 41

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 42MBTRANSPORT GT42 MB NSP - SITE SUMMARY INSTALLATION GT42 PLACING GT42 OIL FLUSHING AND RE-INSTATEMENT GT 42 COLD COMMISSIONING GT42 / AUXILIARIES 1ST. TURNING GEAR GT42 SYSTEM CHECK BY SIEMENS GT42

1ST. IGNITION GT42 29-Dez-16 A

1ST. SYNCHRONIZATION GT GENERATOR 42MKA (POWER TO THE GRID) HOT COMMISSIONING GT42 / OPEN CYCLE OPTIMIZING UNIT 42 OUTAGE (PRIOR TO PERFORMANCE TEST)

5d

02-Mrz-17 A

06-Mrz-17 A

10d

07-Mrz-17 A

16-Mrz-17 A

OUTAGE (PRIOR TO READY FOR RELIABILTY RUN) BALANCING LOADS GT42

4d

17-Mrz-17 A

20-Mrz-17 A

16d

21-Mrz-17 A

05-Apr-17 A

0d

21-Mrz-17 A

RELIABILITY RUN GT 42

30d

09-Apr-17 A

08-Mai-17 A

GT42 COMMERCIAL OPEN CYCLE OPERATION

50d

18-Mai-17 A

06-Jul-17 A

767d

01-Jun-15 A

06-Jul-17 A

PERFORMANCE TEST GT 42

OUTAGE (RELIABILITY RUN - WAITING FOR OWNER GO AHEAD) UNIT 42 READY FOR RELIABILITY RUN RELIABILITY RUN GT 42 GT42 COMMERCIAL OPEN CYCLE OPERATION


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

Layout Name : EG1019_Level2 Dur.

Start

Finish

SP41MB-3-25

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 41MB- 322d

01-Jun-15 A

17-Apr-16 A

SI41MBA4-25

TRANSPORT GT 41 MB NSP - SITE

27d

27-Apr-16 A

24-Mai-16 A

OC41MB-6-20#

SUMMARY INS TALLATION GT41

190d

18-Mai-16 A

24-Nov-16 A

SI41MB-6-11

PLACING GT41

0d

27-Mai-16 A

OC41MB-6-55

OIL FLUSHING GT41

31d

18-Aug-16 A

18-Sep-16 A

SI41MB-8-25#

COLD COMMISSIONING GT41 / AUXILIARIES

31d

26-Nov-16 A

26-Dez-16 A

SI41MB-9-05

1ST. TURNING GEAR GT41

0d

27-Dez-16 A

SI41MBY9-36

SYSTEM CHECK BY SIEMENS GT41

1d

27-Dez-16 A

27-Dez-16 A

SI41MB-9-99

SHIFTING 21BAT TO 41BAT

2d

27-Dez-16 A

28-Dez-16 A

SI41MBY9-35

GT PROTECTION GT41

1d

28-Dez-16 A

28-Dez-16 A

SI41MKA9-10

START UP TES T WITH MBJ 41MBA/SFC COMMISSIONING / MBP FILLING1d

29-Dez-16 A

29-Dez-16 A

SI41MB-9-97

TRANSFORMER 41 BAT REPLACEMENT AND RE- CO MMISSIONING

29-Dez-16 A

14-Jan-17 A

SI41BAC8-98

GENERATOR CIRCUIT BREAKER 41 BAC REPLACEMENT AND RE-COMMISSIONING 6d 16-Jan-17 A

21-Jan-17 A

SI41MB-9-15

1ST. IGNITION GT41

SI41MKA9-40

1ST. SYNCHRONIZATION GT GENERATOR 41MKA (POWER TO THE GRID) 0d

SI41MB-9-00

HOT COMMISSIONING GT41 / OPEN CYCLE

SI41MBA9-92

17d

0d

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 41MBTRANSPORT GT 41 MB NSP - SITE SUMMARY INS TALLATION GT41 PLACING GT41 OIL FLUSHING GT41 COLD COMMISSIONING GT41 / AUXILIARIES 1ST. TURNING GEAR GT41 SYSTEM CHECK BY SIEMENS GT41 SHIFTING 21BAT TO 41BAT GT PROTECTION GT41 START UP TES T WITH MBJ 41MBA/SFC COMMISSIONING / MBP FILLING TRANSFORMER 41 BAT REPLACEMENT AND RE- CO MMISSIONIN G GENERATOR CIRCUIT BREAKER 41 BAC REPLACEMENT AND RE-COMMISSIONING

22-Jan-17 A

1ST. IGNITION GT41 22-Jan-17 A

36d

11-Feb-17 A

18-Mrz-17 A

OUTAGE (PRIOR PERFORMANCE TEST)

3d

13-Mrz-17 A

15-Mrz-17 A

SI41MBA9-70

OPTIMIZING UNIT 41

0d

18-Mrz-17 A

18-Mrz-17 A

SI41MBA9-80

PERFORMANCE TEST GT41 (INCL. PREPARATION)

2d

19-Mrz-17 A

20-Mrz-17 A

SI41MBA9-95

OUTAGE (RELIABILITY RUN - WAITING FOR OWNER GO AHEAD)

16d

21-Mrz-17 A

05-Apr-17 A

SI41MBA9-94

UNIT 41 READY FOR RELIAB ILITY RUN

0d

21-Mrz-17 A

SI41MBA9-90

RELIABILITY RUN GT41

30d

09-Apr-17 A

08-Mai-17 A

SI41OC-9-44

GT41 COMMERCIAL OPEN CYCLE OPERATION

50d

18-Mai-17 A

06-Jul-17 A

767d

01-Jun-15 A

06-Jul-17 A

Block 3 UNIT 32

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 5 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

1ST. SYNCHRONIZATION GT GENERATOR 41MKA (POWER TO THE GRID) HOT COMMISSIONING GT41 / OPEN CYCLE OUTAGE (PRIOR PERFORMANCE TEST) OPTIMIZING UNIT 41 PERFORMANCE TEST GT41 (INCL. PREPARATION) OUTAGE (RELIABILITY RUN - WAITING FOR OWNER GO AHEAD) UNIT 41 READY FOR RELIABILITY RUN RELIABILITY RUN GT41 GT41 COMMERCIAL OPEN CYCLE OPERATION

767d

01-Jun-15 A

06-Jul-17 A

SP32MB-3-25

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 32MB- 322d

01-Jun-15 A

17-Apr-16 A

SI32MBA4-25

TRANSPORT GT32 MB NS P - SITE

36d

02-Mai-16 A

06-Jun-16 A

OC32MB-6-20#

SUMMARY INS TALLATION GT32

190d

20-Jun-16 A

26-Dez-16 A

SI32MB-6-11

PLACING GT32

0d

02-Jul-16 A

OC32MB-6-55

OIL FLUSHING GT 32

28d

29-Nov-16 A

26-Dez-16 A

SI32MB-8-25#

COLD COMMISSIONING GT32 / AUXILIARIES

15d

20-Dez-16 A

03-Jan-17 A

SI32MBY9-36

SYSTEM CHECK BY SIEMENS GT32

0d

09-Jan-17 A

09-Jan-17 A

SYSTEM CHECK BY SIEMENS GT32

SI32MBY9-35

GT PROTECTION GT32

1d

09-Jan-17 A

09-Jan-17 A

GT PROTECTION GT32

SI32MKA9-10

START UP TES T WITH MBJ 32MBA/SFC COMMISSIONING / MBP GAS FILLING 2d 09-Jan-17 A

10-Jan-17 A

SI32MB-9-05

1ST. TURNING GEAR GT32

SI32MKA9-40

1ST. SYNCHRONIZATION GT GENERATOR 32MKA (POWER TO THE GRID) 0d

SI32MB-9-15

1ST. IGNITION GT32

SI32MB-9-00

HOT COMMISSIONING GT32 / OPEN CYCLE

SI32MBA9-92

OUTAGE (PRIOR PERFORMANCE TEST)

SI32MBA9-80 SI32MBA9-96 SI32MBA9-93

OUTAGE (PRIOR RELIABILITY RUN)

SI32MBA9-90

RELIABILITY RUN GT 32

SI32OC-9-45

GT32 COMMERCIAL OPEN CYCLE OPERATION

0d

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 32MBTRANSPORT GT32 MB NS P - SITE SUMMARY INS TALLATION GT32 PLACING GT32 OIL FLUSHING GT 32 COLD COMMISSIONING GT32 / AUXILIARIES

START UP TES T WITH MBJ 32MBA/SFC COMMISSIONING / MBP GAS FILLING

10-Jan-17 A

1ST. TURNING GEAR GT32 13-Jan-17 A

1ST. SYNCHRONIZATION GT GENERATOR 32MKA (POWER TO THE GRID)

0d

13-Jan-17 A

26d

06-Feb-17 A

03-Mrz-17 A

2d

04-Mrz-17 A

05-Mrz-17 A

PERFORMANCE TEST GT 32 (INCL. PREPARATION)

5d

15-Mrz-17 A

19-Mrz-17 A

OPTIMIZING UNIT 32

0d

19-Mrz-17 A

19-Mrz-17 A

OPTIMIZING UNIT 32

0d

20-Mrz-17 A

20-Mrz-17 A

OUTAGE (PRIOR RELIABILITY RUN)

30d

21-Mrz-17 A

19-Apr-17 A

50d

18-Mai-17 A

06-Jul-17 A

767d

01-Jun-15 A

06-Jul-17 A

SP31MB-3-25

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 31MB- 303d

01-Jun-15 A

29-Mrz-16 A

SI31MBA4-25

TRANSPORT GT 31 MB NSP - SITE

39d

29-Apr-16 A

06-Jun-16 A

OC31MB-6-20#

SUMMARY INS TALLATION GT31

164d

20-Jun-16 A

30-Nov-16 A

SI31MB-6-11

PLACING GT31

0d

15-Jul-16 A

OC31MB-6-55

OIL FLUSHING GT31

59d

29-Aug-16 A

27-Okt-16 A

SI31MB-8-25#

COLD COMMISSIONING GT31 / AUXILIARIES

25d

18-Dez-16 A

11-Jan-17 A

SI31MB-9-05

1ST. TURNING GEAR GT31

0d

13-Jan-17 A

SI31MBY9-35

GT PROTECTION GT31

1d

14-Jan-17 A

14-Jan-17 A

SI31MKA9-10

START UP TES T WITH MBJ 31MBA/SFC COMMISSIONING / MBP GAS FILLING 1d 14-Jan-17 A

14-Jan-17 A

SI31MBY9-36

SYSTEM CHECK BY SIEMENS GT31

14-Jan-17 A

SI31MKA9-40

1ST. SYNCHRONIZATION GT GENERATOR 31MKA (POWER TO THE GRID) 0d

SI31MB-9-15

1ST. IGNITION GT31

SI31MB-9-00

HOT COMMISSIONING GT31 / OPEN CYCLE

SI31MBA9-70

OPTIMIZING UNIT 31

SI31MBA9-92

OUTAGE (PRIOR PERFORMANCE TEST)

SI31MBA9-80

PERFORMANCE TEST GT31 (INCL. PREPARATION)

SI31MBA9-93

OUTAGE (PRIOR RELIABILITY RUN)

SI31MBA9-90

RELIABILITY RUN GT31 (failed - restart of RTR required)

SI31MBA9-94

RELIABILITY RUN GT31

SI31OC-9-45

GT31 COMMERCIAL OPEN CYCLE OPERATION

UNIT 31

Block 2 UNIT 22

1d

14-Jan-17 A

1ST. IGNITION GT32 HOT COMMISSIONING GT32 / OPEN CYCLE OUTAGE (PRIOR PERFORMANCE TEST) PERFORMANCE TEST GT 32 (INCL. PREPARATION)

RELIABILITY RUN GT 32 GT32 COMMERCIAL OPEN CYCLE OPERATION

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 31MBTRANSPORT GT 31 MB NSP - SITE SUMMARY INS TALLATION GT31 PLACING GT31 OIL FLUSHING GT31 COLD COMMISSIONING GT31 / AUXILIARIES 1ST. TURNING GEAR GT31 GT PROTECTION GT31 START UP TES T WITH MBJ 31MBA/SFC COMMISSIONING / MBP GAS FILLING SYSTEM CHECK BY SIEMENS GT31

15-Jan-17 A

0d

15-Jan-17 A

10d

09-Feb-17 A

18-Feb-17 A

0d

18-Feb-17 A

18-Feb-17 A

13d

19-Feb-17 A

03-Mrz-17 A

3d

04-Mrz-17 A

06-Mrz-17 A

12d

07-Mrz-17 A

19-Mrz-17 A

13d

21-Mrz-17 A

03-Apr-17 A

30d

09-Apr-17 A

08-Mai-17 A

1ST. SYNCHRONIZATION GT GENERATOR 31MKA (POWER TO THE GRID) 1ST. IGNITION GT31

50d

18-Mai-17 A

06-Jul-17 A

786d

04-Sep-15 A

28-Okt-17

786d

04-Sep-15 A

28-Okt-17

SP22MB-3-25

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 22MB- 404d

04-Sep-15 A

11-Okt-16 A

SI22MBA4-25

TRANSPORT GT22 MB NS P - SITE

20d

19-Okt-16 A

07-Nov-16 A

OC22MB-6-20#

SUMMARY INS TALLATION GT22

197d

24-Okt-16 A

09-Mai-17 A

SI22MB-6-11

PLACING GT22

0d

22-Nov-16 A

OC22MB-6-55

OIL FLUSHING GT 22

26d

13-Apr-17 A

HOT COMMISSIONING GT31 / OPEN CYCLE OPTIMIZING UNIT 31 OUTAGE (PRIOR PERFORMANCE TEST) PERFORMANCE TEST GT31 (INCL. PREPARATION) OUTAGE (PRIOR RELIABILITY RUN) RELIABILITY RUN GT31 (failed - restart of RTR required) RELIABILITY RUN GT31 GT31 COMMERCIAL OPEN CYCLE OPERATION

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 22MBTRANSPORT GT22 MB NSP - SITE SUMMARY INS TALLATION GT22 PLACING GT22

09-Mai-17 A

OIL FLUSHING GT 22


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

Layout Name : EG1019_Level2 Dur.

Start

Finish

15-Jun-17 A

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 6 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

SI22MB-8-25#

COLD COMMISSIONING GT22 / AUXILIARIES

33d

14-Mai-17 A

SI22MB-9-05

1ST. TURNING GEAR GT22

0d

27-Mai-17 A

SI22MBY9-35

GT PROTECTION GT22

3d

27-Mai-17 A

29-Mai-17 A

GT PROTECTION GT22

SI22MBY9-36

SYSTEM CHECK BY SIEMENS GT22

0d

27-Mai-17 A

27-Mai-17 A

SYSTEM CHECK BY SIEMENS GT22

SI22MKA9-10

START UP TES T WITH MBJ 22MBA

1d

29-Mai-17 A

29-Mai-17 A

START UP TEST WITH MBJ 22MBA

SI22MKA9-40

1ST. SYNCHRONIZATION GT GENERATOR 22MKA (TARGET POWER TO0d THE GRID) 30-Mai-17 A

1ST. SYNCHRONIZATION GT GENERATOR 22MKA (TARGET POWER TO THE GRID)

SI22MB-9-15

1ST. IGNITION GT22

1ST. IGNITION GT22

SI22MKA9-42

BASE LOAD OPERATION

9d

30-Mai-17 A

07-Jun-17 A

SI22MKA9-41

OUTAGE PRIOR HOT COMMISSIONING GT22

10d

08-Jun-17 A

17-Jun-17 A

SI22MB-9-00

HOT COMMISSIONING GT22 / OPEN CYCLE

16d

18-Jun-17 A

03-Jul-17 A

SI22MKA9-43

OUTAGE PRIOR PERFORMANCE TEST GT22

10d

04-Jul-17 A

13-Jul-17 A

SI22MBA9-70

OPTIMIZING UNIT 22

SI22MKA9-44

OUTAGE PRIOR PERFORMANCE TEST GT22 (GASCO)

SI22MBA9-80

PERFORMANCE TEST GT 22

SI22MBA9-90

RELIABILITY RUN GT 22

SI22OC-9-45

GT22 COMMERCIAL OPEN CYCLE OPERATION

0d

COLD COMMISSIONING GT22 / AUXILIARIES 1ST. TURNING GEAR GT22

30-Mai-17 A BASE LOAD OPERATION OUTAGE PRIOR HOT COMMISSIONING GT22

HOT COMMISSIONING GT22 / OPEN CYCLE OUTAGE PRIOR PERFORMANCE TEST GT22

0d

04-Jul-17 A

04-Jul-17 A

14d

14-Jul-17 A

27-Jul-17

2d

08-Aug-17*

09-Aug-17

30d

10-Aug-17

08-Sep-17

50d

09-Sep-17

28-Okt-17

783d

04-Sep-15 A

25-Okt-17

SP21MB-3-25

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 21MB- 394d

04-Sep-15 A

01-Okt-16 A

SI21MBA4-25

TRANSPORT GT 21 MB TO SITE

22d

09-Okt-16 A

31-Okt-16 A

OC21MB-6-20#

SUMMARY INS TALLATION GT21

209d

15-Okt-16 A

11-Mai-17 A

SI21MB-6-11

PLACING GT21

0d

27-Nov-16 A

OC21MB-6-55

OIL FLUSHING GT21

26d

14-Apr-17 A

10-Mai-17 A

SI21MB-8-25#

COLD COMMISSIONING GT21 / AUXILIARIES

33d

14-Mai-17 A

15-Jun-17 A

SI21MB-9-05

1ST. TURNING GEAR GT21

0d

27-Mai-17 A

SI21MBY9-36

SYSTEM CHECK BY SIEMENS GT21

0d

27-Mai-17 A

27-Mai-17 A

SYSTEM CHECK BY SIEMENS GT21

SI21MBY9-35

GT PROTECTION GT21

3d

27-Mai-17 A

29-Mai-17 A

GT PROTECTION GT21

SI21MKA9-10

START UP TES T WITH MBJ 21MBA

1d

30-Mai-17 A

30-Mai-17 A

SI21MB-9-15

1ST. IGNITION GT21

0d

31-Mai-17 A

SI21MKA9-40

1ST. SYNCHRONIZATION GT GENERATOR 21MKA (TARGET POWER TO0d THE GRID) 31-Mai-17 A

SI21MKA9-42

BASE LOAD OPERATION

SI21MKA9-41 SI21MB-9-00

UNIT 21

PERFORMANCE TEST GT 22 RELIABILITY RUN GT 22 GT22 COMMERCIAL OPEN CYCLE OPERATION

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 21MBTRANSPORT GT 21 MB TO SITE SUMMARY INS TALLATION GT21 PLACING GT21 OIL FLUSHING GT21 COLD COMMISSIONING GT21 / AUXILIARIES 1ST. TURNING GEAR GT21

START UP TES T WITH MBJ 21MBA 1ST. IGNITION GT21 1ST. SYNCHRONIZATION GT GENERATOR 21MKA (TARGET POWER TO THE GRID)

8d

31-Mai-17 A

07-Jun-17 A

OUTAGE PRIOR HOT COMMISSIONING GT21

7d

08-Jun-17 A

14-Jun-17 A

HOT COMMISSIONING GT21 / OPEN CYCLE

19d

15-Jun-17 A

03-Jul-17 A

SI21MKA9-43

OUTAGE PRIOR PERFORMANCE TEST GT21

10d

04-Jul-17 A

13-Jul-17 A

SI21MBA9-70

OPTIMIZING UNIT 21

SI21MKA9-44

OUTAGE PRIOR PERFORMANCE TEST GT21 (GASCO)

SI21MBA9-80

PERFORMANCE TEST GT21

SI21MBA9-90

RELIABILITY RUN GT21

SI21OC-9-45

GT21 COMMERCIAL OPEN CYCLE OPERATION

Block 1 UNIT 11

OPTIMIZING UNIT 22 OUTAGE PRIOR PERFORMANCE TEST GT22 (GASCO)

0d

04-Jul-17 A

04-Jul-17 A

14d

14-Jul-17 A

27-Jul-17

2d

05-Aug-17*

06-Aug-17

30d

07-Aug-17

05-Sep-17

50d

06-Sep-17

25-Okt-17

652d

14-Jan-16 A

26-Okt-17

BASE LOAD OPERATION OUTAGE PRIOR HOT COMMISSIONING GT21 HOT COMMISSIONING GT21 / OPEN CYCLE OUTAGE PRIOR PERFORMANCE TEST GT21 OPTIMIZING UNIT 21 OUTAGE PRIOR PERFORMANCE TEST GT21 (GASCO) PERFORMANCE TEST GT21 RELIABILITY RUN GT21 GT21 COMMERCIAL OPEN CYCLE OPERATION

649d

14-Jan-16 A

23-Okt-17

SP11MB-3-25

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 11MB- 400d

14-Jan-16 A

16-Feb-17 A

OC11MB-6-20#

SUMMARY INS TALLATION GT11

232d

02-Jan-17 A

21-Aug-17

SI11MBA4-25

TRANSPORT GT 11 MB TO SITE

24d

24-Feb-17 A

19-Mrz-17 A

SI11MB-6-11

PLACING GT11

0d

14-Apr-17 A

OC11MB-6-55

OIL FLUSHING GT11

7d

15-Aug-17

21-Aug-17

SI11MB-8-25#

COLD COMMISSIONING GT11 / AUXILIARIES

20d

11-Sep-17

30-Sep-17

SI11MB-9-05

1ST. TURNING GEAR GT11

0d

03-Okt-17

SI11MBY9-35

GT PROTECTION GT11

1d

03-Okt-17

03-Okt-17

SI11MKA9-10

START UP TES T WITH MBJ 11MBA

1d

08-Okt-17

08-Okt-17

SI11MKA9-40

1ST. SYNCHRONIZATION GT GENERATOR 11MKA (TARGET POW ER TO 0d THE GRID) 09-Okt-17

1ST. SYNCHRONIZATION GT GENERATOR 11MKA (TARGET POW ER TO THE GRID)

SI11MB-9-15

1ST. IGNITION GT11

1ST. IGNITION GT11

SI11MB-9-00

HOT COMMISSIONING GT11 / OPEN CYCLE

0d

SUMMARY INS TALLATION GT11 TRANSPORT GT 11 MB TO SITE PLACING GT11 OIL FLUSHING GT11 COLD COMMISSIONING GT11 / AUXILIARIES 1ST. TURNING GEAR GT11 GT PROTECTION GT11 START UP TES T WITH MBJ 11MBA

09-Okt-17

15d

09-Okt-17

23-Okt-17

652d

14-Jan-16 A

26-Okt-17

SP12MB-3-25

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 12MB- 368d

14-Jan-16 A

15-Jan-17 A

SI12MBA4-25

TRANSPORT GT12 MB TO SITE

15d

27-Jan-17 A

10-Feb-17 A

OC12MB-6-20#

SUMMARY INS TALLATION GT12

178d

24-Feb-17 A

20-Aug-17

SI12MB-6-11

PLACING GT12

0d

30-Mrz-17 A

OC12MB-6-55

OIL FLUSHING GT 12

SI12MB-8-25#

COLD COMMISSIONING GT12 / AUXILIARIES

SI12MB-9-05

UNIT 12

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 11MB-

HOT COMMISSIONING GT11 / OPEN CYCLE

DESIGN / PROCUREMENT / MANUFACTURING GAS TURBINE 12MBTRANSPORT GT12 MB TO SITE SUMMARY INS TALLATION GT12 PLACING GT12

2d

09-Aug-17

10-Aug-17

23d

11-Sep-17

03-Okt-17

1ST. TURNING GEAR GT12

0d

06-Okt-17

SI12MBY9-35

GT PROTECTION GT12

1d

06-Okt-17

06-Okt-17

GT PROTECTION GT12

SI12MKA9-10

START UP TES T WITH MBJ 12MBA

1d

11-Okt-17

11-Okt-17

START UP TEST WITH MBJ 12MBA

SI12MKA9-40

1ST. SYNCHRONIZATION GT GENERATOR 12MKA (TARGET POWER TO0d THE GRID) 12-Okt-17

1ST. SYNCHRONIZATION GT GENERATOR 12MKA (TARGET POWER TO THE GRID)

SI12MB-9-15

1ST. IGNITION GT12

1ST. IGNITION GT12

SI12MB-9-00

HOT COMMISSIONING GT12 / OPEN CYCLE

Air Intake System MBL Block 4 UNIT 42

0d

OIL FLUSHING GT 12 COLD COMMISSIONING GT12 / AUXILIARIES 1ST. TURNING GEAR GT12

12-Okt-17

15d

12-Okt-17

26-Okt-17

771d

22-Jul-15 A

30-Aug-17

523d

22-Jul-15 A

25-Dez-16 A

519d

22-Jul-15 A

21-Dez-16 A

208d

22-Jul-15 A

15-Feb-16 A

SP42MBL3-25

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 42MBL

SI42MBL4-25

TRANSPORT AIR INTAK E SYS TEM 42MBL NSP-SITE

55d

20-Apr-16 A

13-Jun-16 A

OC42MBL6-15

ERECTION AIR INTAKE DUCT 42MBL

61d

20-Jun-16 A

20-Aug-16 A

OC42MBL6-20

ERECTION FILTERHOUSE 42MBL

137d

30-Jul-16 A

13-Dez-16 A

HOT COMMISSIONING GT12 / OPEN CYCLE

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 42MBL TRANSPORT AIR INTAK E SYS TEM 42MBL NSP-SITE ERECTION AIR IN TAKE DUCT 42MBL ERECTION FILTERHOUSE 42MBL


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

OC42MBL6-25

ERECTION AIR INTAKE SILENCER BAFFELS 42MBL

SI42MBL8-25

COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 42MBL

UNIT 41

Layout Name : EG1019_Level2 Dur.

Start

Finish

99d

06-Sep-16 A

13-Dez-16 A

7d

15-Dez-16 A

21-Dez-16 A

514d

31-Jul-15 A

25-Dez-16 A

SP41MBL3-25

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 41MBL

225d

31-Jul-15 A

11-Mrz-16 A

SI41MBL4-25

TRANSPORT AIR INTAK E SYS TEM 41MBL NSP-SITE

55d

20-Apr-16 A

13-Jun-16 A

OC41MBL6-15

ERECTION AIR INTAKE DUCT 41MBL

49d

23-Jun-16 A

11-Aug-16 A

OC41MBL6-20

ERECTION FILTERHOUSE 41MBL

43d

19-Jul-16 A

31-Aug-16 A

OC41MBL6-25

ERECTION AIR INTAKE SILENCER BAFFELS 41MBL

0d

17-Aug-16 A

17-Aug-16 A

SI41MBL8-25

COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 41MBL

7d

19-Dez-16 A

25-Dez-16 A

522d

07-Aug-15 A

09-Jan-17 A

512d

07-Aug-15 A

30-Dez-16 A

250d

07-Aug-15 A

12-Apr-16 A

53d

27-Apr-16 A

18-Jun-16 A

138d

30-Jul-16 A

14-Dez-16 A

Block 3 UNIT 32 SP32MBL3-25

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 32MBL

SI32MBL4-25

TRANSPORT AIR INTAK E SYS TEM 32MBL NSP-SITE

OC32MBL6-20

ERECTION FILTERHOUSE 32MBL

OC32MBL6-15

ERECTION AIR INTAKE DUCT 32MBL

23d

09-Aug-16 A

01-Sep-16 A

OC32MBL6-25

ERECTION AIR INTAKE SILENCER BAFFELS 32MBL

94d

13-Sep-16 A

15-Dez-16 A

SI32MBL8-25

COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 32MBL

4d

27-Dez-16 A

30-Dez-16 A

513d

16-Aug-15 A

09-Jan-17 A

248d

16-Aug-15 A

19-Apr-16 A

44d

06-Mai-16 A

18-Jun-16 A

132d

06-Aug-16 A

15-Dez-16 A

22-Aug-16 A

03-Sep-16 A

UNIT 31 SP31MBL3-25

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 31MBL

SI31MBL4-25

TRANSPORT AIR INTAK E SYS TEM 31MBL NSP-SITE

OC31MBL6-20

ERECTION FILTERHOUSE 31MBL

OC31MBL6-15

ERECTION AIR INTAKE DUCT 31MBL

12d

OC31MBL6-25

ERECTION AIR INTAKE SILENCER BAFFELS 31MBL

66d

11-Okt-16 A

15-Dez-16 A

SI31MBL8-25

COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 31MBL

2d

08-Jan-17 A

09-Jan-17 A

507d

04-Jan-16 A

24-Mai-17 A

Block 2 UNIT 22

507d

04-Jan-16 A

24-Mai-17 A

SP22MBL3-25

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 22MBL

249d

04-Jan-16 A

08-Sep-16 A

SI22MBL4-25

TRANSPORT AIR INTAK E SYS TEM 22MBL NSP-SITE

133d

23-Sep-16 A

02-Feb-17 A

OC22MBL6-15

ERECTION AIR INTAKE DUCT 22MBL

22d

16-Feb-17 A

09-Mrz-17 A

OC22MBL6-20

ERECTION FILTERHOUSE 22MBL

61d

10-Mrz-17 A

10-Mai-17 A

OC22MBL6-25

ERECTION AIR INTAKE SILENCER BAFFELS 22MBL

23d

16-Apr-17 A

09-Mai-17 A

SI22MBL8-25

COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 22MBL

7d

18-Mai-17 A

24-Mai-17 A

495d

12-Jan-16 A

20-Mai-17 A

UNIT 21 SP21MBL3-25

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 21MBL

248d

12-Jan-16 A

15-Sep-16 A

SI21MBL4-25

TRANSPORT AIR INTAK E SYS TEM 21MBL NSP-SITE

126d

30-Sep-16 A

02-Feb-17 A

OC21MBL6-15

ERECTION AIR INTAKE DUCT 21MBL

20d

18-Feb-17 A

09-Mrz-17 A

OC21MBL6-20

ERECTION FILTERHOUSE 21MBL

61d

10-Mrz-17 A

10-Mai-17 A

OC21MBL6-25

ERECTION AIR INTAKE SILENCER BAFFELS 21MBL

23d

16-Apr-17 A

09-Mai-17 A

SI21MBL8-25

COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 21MBL

7d

14-Mai-17 A

20-Mai-17 A

466d

22-Mai-16 A

30-Aug-17

466d

22-Mai-16 A

30-Aug-17

250d

22-Mai-16 A

26-Jan-17 A

Block 1 UNIT 11 SP11MBL3-25

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 11MBL

SI11MBL4-25

TRANSPORT AIR INTAK E SYS TEM 11MBL NS P-SITE

25d

10-Feb-17 A

06-Mrz-17 A

OC11MBL6-20

ERECTION FILTERHOUSE 11MBL

58d

09-Jun-17 A

05-Aug-17

OC11MBL6-15

ERECTION AIR INTAKE DUCT 11MBL

26d

13-Jun-17 A

08-Jul-17 A

OC11MBL6-25

ERECTION AIR INTAKE SILENCER BAFFELS 11MBL

10d

06-Aug-17

15-Aug-17

SI11MBL8-25

COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 11MBL

7d

24-Aug-17

30-Aug-17

24-Mai-16 A

30-Aug-17

464d

UNIT 12

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 7 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 ERECTION AIR INTAKE SILENCER BAFFELS 42MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 42MBL

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 41MBL TRANSPORT AIR INTAK E SYS TEM 41MBL NSP-SITE ERECTION AIR IN TAKE DUCT 41MBL ERECTION FILTERHOUSE 41MBL ERECTION AIR INTAKE SILENCER BAFFELS 41MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 41MBL

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 32MBL TRANSPORT AIR INTAKE SYSTEM 32MBL NSP-SITE ERECTION FILTERHOUSE 32MBL ERECTION AIR IN TAKE DUCT 32MBL ERECTION AIR IN TAKE SILENCER BAFFELS 32MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 32MBL

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 31MBL TRANSPORT AIR INTAKE SYSTEM 31MBL NSP-SITE ERECTION FILTERHOUSE 31MBL ERECTION AIR INTAKE DUCT 31MBL ERECTION AIR INTAKE SILENCER BAFFELS 31MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 31MBL

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 22MBL TRANSPORT AIR INTAKE SYS TEM 22MBL NSP-SITE ERECTION AIR INTAKE DUCT 22MBL ERECTION FILTERHOUSE 22MBL ERECTION AIR INTAKE SILENCER BAFFELS 22MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 22MBL

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 21MBL TRANSPORT AIR INTAKE SYS TEM 21MBL NSP-SITE ERECTION AIR INTAKE DUCT 21MBL ERECTION FILTERHOUSE 21MBL ERECTION AIR INTAKE SILENCER BAFFELS 21MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 21MBL

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 11MBL TRANSPORT AIR INTAK E SYS TEM 11MBL NS P-SITE ERECTION FILTERHOUSE 11MBL ERECTION AIR INTAKE DUCT 11MBL ERECTION AIR INTAKE SILENCER BAFFELS 11MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 11MBL

SP12MBL3-25

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 12MBL

248d

24-Mai-16 A

26-Jan-17 A

SI12MBL4-25

TRANSPORT AIR INTAK E SYS TEM 12MBL NSP-SITE

25d

10-Feb-17 A

06-Mrz-17 A

OC12MBL6-20

ERECTION FILTERHOUSE 12MBL

58d

09-Jun-17 A

05-Aug-17

ERECTION FILTERHOUSE 12MBL

OC12MBL6-15

ERECTION AIR INTAKE DUCT 12MBL

26d

13-Jun-17 A

08-Jul-17 A

ERECTION AIR INTAKE DUCT 12MBL

OC12MBL6-25

ERECTION AIR INTAKE SILENCER BAFFELS 12MBL

10d

06-Aug-17

15-Aug-17

SI12MBL8-25

COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 12MBL

7d

24-Aug-17

30-Aug-17

1004d

04-Sep-15 A

03-Jun-18

956d

04-Sep-15 A

16-Apr-18

956d

04-Sep-15 A

16-Apr-18

197d

04-Sep-15 A

18-Mrz-16 A

56d

26-Mrz-16 A

20-Mai-16 A

Bypass Stack including Diverter Damper MBR Block 4 UNIT 42 SI42MBR3E25

DESIGN, MANUFACTURING DIVERTER FLAP 42MBR

SI42MBR4E25

TRANSPORT DIVE RTER FLAP 42MBR VIETNAM - SITE (CHARTER)

OC42MBR6F15#

SUMMARY ERECTION DIV ERTER FLAP / STACK 42MB R

148d

24-Mai-16 A

18-Okt-16 A

OC42MBR6E15

ERECTION DIVERTER / DIVERTER FLAP 42MBR

164d

24-Mai-16 A

04-Nov-16 A

SI42MBR8A25

COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 42MBR

SI42MBR8J25

REMOVE BLANKING BLADE / INSTALL COMPENSATOR

UNIT 41

7d

10-Dez-16 A

16-Dez-16 A

14d

03-Apr-18

16-Apr-18

928d

02-Okt-15 A

16-Apr-18

172d

02-Okt-15 A

21-Mrz-16 A

54d

29-Mrz-16 A

22-Mai-16 A

SI41MBR3E25

DESIGN, MANUFACTURING DIVERTER FLAP 41MBR

SI41MBR4E25

TRANSPORT DIVE RTER FLAP 41MBR VIETNAM - SITE

OC41MBR6F15#

SUMMARY ERECTION DIV ERTER FLAP / STACK 41MB R

135d

06-Jun-16 A

18-Okt-16 A

OC41MBR6E15

ERECTION DIVERTER / DIVERTER FLAP 41MBR

151d

06-Jun-16 A

04-Nov-16 A

SI41MBR8A25

COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 41MBR

SI41MBR8A26

REMOVE BLANKING BLADE / INSTALL COMPENSATOR

Block 3 UNIT 32 SI32MBR3E25

DESIGN, MANUFACTURING DIVERTER FLAP 32MBR

7d

13-Dez-16 A

19-Dez-16 A

14d

03-Apr-18

16-Apr-18

837d

30-Okt-15 A

12-Feb-18

837d

30-Okt-15 A

12-Feb-18

186d

30-Okt-15 A

02-Mai-16 A

DETAIL DESIGN / MANUFA CTURING AIR INTAKE SYSTE M 12MBL TRANSPORT AIR INTAK E SYS TEM 12MBL NSP-SITE

ERECTION AIR INTAKE SILENCER BAFFELS 12MBL COLD COMMISSIONING AIR INTAKE SYSTEM UNIT 12MBL

DESIGN, MANUFACTURING DIVERTER FLAP 42MBR TRANSPORT DIVERTER FLAP 42MBR VIETNAM - SITE (CHARTER) SUMMARY ERECTION DIV ERTER FLAP / STACK 42MB R ERECTION DIVERTER / DIVERTER FLAP 42MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 42MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR

DESIGN, MANUFACTURING DIVERTER FLAP 41MBR TRANSPORT DIVE RTER FLAP 41MBR VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 41MB R ERECTION DIVERTER / DIVERTER FLAP 41MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 41MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR

DESIGN, MANUFACTURING DIVERTER FLAP 32MBR


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

SI32MBR4E25

TRANSPORT DIVE RTER FLAP 32MBR VIETNAM - SITE

OC32MBR6F15#

SUMMARY ERECTION DIV ERTER FLAP / STACK 32MB R

OC32MBR6E15

ERECTION DIVERTER / DIVERTER FLAP 32MBR

SI32MBR8A25

COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 32MBR

SI32MBR8J25

REMOVE BLANKING BLADE / INSTALL COMPENSATOR

UNIT 31 SI31MBR3E25

DESIGN, MANUFACTURING DIVERTER FLAP 31MBR

SI31MBR4E25

TRANSPORT DIVE RTER FLAP 31MBR VIETNAM - SITE

OC31MBR6F15#

SUMMARY ERECTION DIV ERTER FLAP / STACK 31MB R

OC31MBR6E15

ERECTION DIVERTER / DIVERTER FLAP 31MBR

SI31MBR8A25

COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 31MBR

SI31MBR8A26

REMOVE BLANKING BLADE / INSTALL COMPENSATOR

Block 2 UNIT 22

Layout Name : EG1019_Level2 Dur.

Start

Finish

43d

10-Mai-16 A

22-Jun-16 A

127d

09-Aug-16 A

14-Dez-16 A

87d

09-Aug-16 A

04-Nov-16 A

7d

03-Jan-17 A

09-Jan-17 A

14d

30-Jan-18

12-Feb-18

809d

27-Nov-15 A

12-Feb-18

171d

27-Nov-15 A

15-Mai-16 A

65d

23-Mai-16 A

27-Jul-16 A

119d

17-Aug-16 A

14-Dez-16 A

79d

17-Aug-16 A

04-Nov-16 A

3d

08-Jan-17 A

10-Jan-17 A

14d

30-Jan-18

12-Feb-18

777d

25-Dez-15 A

08-Feb-18

777d

25-Dez-15 A

08-Feb-18

186d

25-Dez-15 A

27-Jun-16 A

56d

05-Jul-16 A

29-Aug-16 A

154d

13-Nov-16 A

15-Apr-17 A

SI22MBR3E25

DESIGN, MANUFACTURING DIVERTER FLAP 22MBR

SI22MBR4E25

TRANSPORT DIVE RTER FLAP 22MBR VIETNAM - SITE

OC22MBR6F15#

SUMMARY ERECTION DIV ERTER FLAP / STACK 22MB R

OC22MBR6E15

ERECTION DIVERTER / DIVERTER FLAP 22MBR

83d

13-Nov-16 A

03-Feb-17 A

SI22MBR8A25

COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 22MBR

14d

11-Mai-17 A

24-Mai-17 A

SI22MBR8J25

REMOVE BLANKING BLADE / INSTALL COMPENSATOR

14d

26-Jan-18

08-Feb-18

749d

22-Jan-16 A

08-Feb-18

186d

22-Jan-16 A

25-Jul-16 A

63d

21-Jul-16 A

22-Sep-16 A

148d

19-Nov-16 A

15-Apr-17 A

80d

19-Nov-16 A

07-Feb-17 A

UNIT 21 SI21MBR3E25

DESIGN, MANUFACTURING DIVERTER FLAP 21MBR

SI21MBR4E25

TRANSPORT DIVE RTER FLAP 21MBR VIETNAM - SITE

OC21MBR6F15#

SUMMARY ERECTION DIV ERTER FLAP / STACK 21MB R

OC21MBR6E15

ERECTION DIVERTER / DIVERTER FLAP 21MBR

SI21MBR8A25

COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 21MBR

SI21MBR8A26

REMOVE BLANKING BLADE / INSTALL COMPENSATOR

Block 1 UNIT 11

7d

18-Mai-17 A

24-Mai-17 A

14d

26-Jan-18

08-Feb-18

836d

19-Feb-16 A

03-Jun-18

836d

19-Feb-16 A

03-Jun-18

186d

19-Feb-16 A

22-Aug-16 A

63d

30-Aug-16 A

01-Nov-16 A

228d

30-Dez-16 A

14-Aug-17

SI11MBR3E25

DESIGN, MANUFACTURING DIVERTER FLAP 11MBR

SI11MBR4E25

TRANSPORT DIVE RTER FLAP 11MB R VIETNAM - SITE

OC11MBR6F15#

SUMMARY ERECTION DIV ERTER FLAP / STACK 11MBR

OC11MBR6E15

ERECTION DIVERTER / DIVERTER FLAP 11MBR

66d

30-Dez-16 A

06-Mrz-17 A

SI11MBR8A25

COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 11MBR

14d

16-Aug-17

29-Aug-17

SI11MBR8A26

REMOVE BLANKING BLADE / INSTALL COMPENSATOR

14d

21-Mai-18

03-Jun-18

808d

18-Mrz-16 A

03-Jun-18

186d

18-Mrz-16 A

19-Sep-16 A

89d

27-Sep-16 A

25-Dez-16 A

246d

12-Dez-16 A

14-Aug-17

UNIT 12 SI12MBR3E25

DESIGN, MANUFACTURING DIVERTER FLAP 12MBR

SI12MBR4E25

TRANSPORT DIVE RTER FLAP 12MBR VIETNAM - SITE

OC12MBR6F15#

SUMMARY ERECTION DIV ERTER FLAP / STACK 12MB R

OC12MBR6E15

ERECTION DIVERTER / DIVERTER FLAP 12MBR

84d

12-Dez-16 A

06-Mrz-17 A

SI12MBR8A25

COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 12MBR

14d

15-Aug-17

28-Aug-17

SI12MBR8J25

REMOVE BLANKING BLADE / INSTALL COMPENSATOR

14d

21-Mai-18

03-Jun-18

863d

01-Jun-15 A

10-Okt-17

576d

01-Jun-15 A

27-Dez-16 A

575d

01-Jun-15 A

26-Dez-16 A

285d

01-Jun-15 A

11-Mrz-16 A

20d

GT Generator MKA Block 4 UNIT 42

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 8 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 TRANSPORT DIVE RTER FLAP 32MBR VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 32MB R ERECTION DIVERTER / DIVERTER FLAP 32MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 32MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR

DESIGN, MANUFACTURING DIVERTER FLAP 31MBR TRANSPORT DIVERTER FLAP 31MBR VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 31MB R ERECTION DIVERTER / DIVERTER FLAP 31MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 31MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR

DESIGN, MANUFACTURING DIVERTER FLAP 22MBR TRANSPORT DIVE RTER FLAP 22MBR VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 22MB R ERECTION DIVERTER / DIVERTER FLAP 22MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 22MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR

DESIGN, MANUFACTURING DIVERTER FLAP 21MBR TRANSPORT DIVE RTER FLAP 21MBR VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 21MB R ERECTION DIVERTER / DIVERTER FLAP 21MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 21MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR

DESIGN, MANUFACTURING DIVERTER FLAP 11MBR TRANSPORT DIVE RTER FLAP 11MB R VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 11MBR ERECTION DIVERTER / DIVERTER FLAP 11MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 11MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR

DESIGN, MANUFACTURING DIVERTER FLAP 12MBR TRANSPORT DIVERTER FLAP 12MBR VIETNAM - SITE SUMMARY ERECTION DIV ERTER FLAP / STACK 12MB R ERECTION DIVERTER / DIVERTER FLAP 12MBR COMMISSIONING BYPASS STACK INCL. DIVERTER FLAP 12MBR REMOVE BLANKING BLADE / INSTALL COMPENSATOR

SP42MKA3-25

MANUFACTURING GT GENERATOR 42MKA

SI42MKA4-21

TRANSPORT GT GENERATO R 42MKA CHARLESTON-SITE

03-Mai-16 A

23-Mai-16 A

OC42MKA6-15#

SUMMARY INS TALLATION GEN 42 (INCL. PREPARATION FOUNDATIO N) 204d 42MKA 21-Mai-16 A

10-Dez-16 A

SI42MKA6-10

PLACING GENERATOR 42MKA

0d

13-Jun-16 A

SI42MKW8-25

COLD COMMISSIONING GENERATOR 42MKW SEAL OIL SYSTEM

3d

20-Dez-16 A

22-Dez-16 A

SI42MKG8-25

COLD COMMISSIONING GENERATOR 42MKG GAS SUPPLY SYSTEM

3d

21-Dez-16 A

23-Dez-16 A

COLD COMMISSIONING GENERATOR 42MKG GAS SUPPLY SYSTEM

SI42MKQ8-25

COLD COMMISSIONING GENERATOR 42MKQ WASTE GAS SYSTEM

2d

21-Dez-16 A

22-Dez-16 A

COLD COMMISSIONING GENERATOR 42MKQ WASTE GAS SYSTEM

SI42MKA8-25

COLD COMMISSIONING GENERATOR 42MKA

3d

21-Dez-16 A

23-Dez-16 A

SI42MKA8-26

GENERATOR 42MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 1d 26-Dez-16 A

26-Dez-16 A

UNIT 41

MANUFACTURING GT GENERATOR 42MKA TRANSPORT GT GENERATO R 42MKA CHARLESTON-SITE SUMMARY INSTALLATION GEN 42 (INCL. PREPARATION FOUNDATIO N) 42MKA PLACING GENERATOR 42MKA

576d

01-Jun-15 A

27-Dez-16 A

300d

01-Jun-15 A

26-Mrz-16 A

0d

27-Mrz-16 A

COLD COMMISSIONING GENERATOR 42MKW SEAL OIL SYSTEM

COLD COMMISSIONING GENERATOR 42MKA GENERATOR 42MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE)

SP41MKA3-25

MANUFACTURING GT GENERATOR 41MKA

SP41MKA3-80

DELIVERY GT GENERATO R 41MKA - EX WORKS

OC41MKA6-15#

SUMMARY INS TALLATION GEN41 (INCL. PREPARATION FOUNDATION) 215d 41MKA10-Mai-16 A

SI41MKA6-10

PLACING GENERATOR 41MKA

0d

05-Jun-16 A

SI41MKW8-25

COLD COMMISSIONING GENERATOR 41MKW SEAL OIL SYSTEM

8d

15-Dez-16 A

22-Dez-16 A

SI41MKA8-25

COLD COMMISSIONING GENERATOR 41MKA

3d

20-Dez-16 A

22-Dez-16 A

SI41MKG8-25

COLD COMMISSIONING GENERATOR 41MKG GAS SUPPLY SYSTEM

3d

24-Dez-16 A

26-Dez-16 A

COLD COMMISSIONING GENERATOR 41MKG GAS SUPPLY SYSTEM

SI41MKQ8-25

COLD COMMISSIONING GENERATOR 41MKQ WASTE GAS SYSTEM

2d

24-Dez-16 A

25-Dez-16 A

COLD COMMISSIONING GENERATOR 41MKQ WASTE GAS SYSTEM

SI41MKA8-26

GENERATOR 41MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 1d 27-Dez-16 A

27-Dez-16 A

GENERATOR 41MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE)

Block 3 UNIT 32

MANUFACTURING GT GENERATOR 41MKA DELIVERY GT GENERATO R 41MKA - EX WORKS

10-Dez-16 A

SUMMARY INS TALLATION GEN41 (INCL. PREPARATION FOUNDATION) 41MKA PLACING GENERATOR 41MKA

616d

01-Jun-15 A

05-Feb-17 A

616d

01-Jun-15 A

05-Feb-17 A

297d

01-Jun-15 A

24-Mrz-16 A

41d

COLD COMMISSIONING GENERATOR 41MKW SEAL OIL SYSTEM COLD COMMISSIONING GENERATOR 41MKA

SP32MKA3-25

MANUFACTURING GT GENERATOR 32MKA

SI32MKA4-21

TRANSPORT GT GENERATO R 32MKA CHARLESTON - SITE

26-Apr-16 A

05-Jun-16 A

OC32MKA6-15#

SUMMARY INS TALLATION GEN 32 (INCL. PREPARATION FOUNDATIO N) 176d 32MKA 18-Jun-16 A

10-Dez-16 A

SI32MKA6-10

PLACING GENERATOR 32MKA

0d

05-Jul-16 A

SI32MKW8-25

COLD COMMISSIONING GENERATOR 32MKW SEAL OIL SYSTEM

4d

27-Dez-16 A

30-Dez-16 A

SI32MKG8-25

COLD COMMISSIONING GENERATOR 32MKG GAS SUPPLY SYSTEM

4d

27-Dez-16 A

30-Dez-16 A

COLD COMMISSIONING GENERATOR 32MKG GAS SUPPLY SYSTEM

SI32MKQ8-25

COLD COMMISSIONING GENERATOR 32MKQ WASTE GAS SYSTEM

2d

27-Dez-16 A

28-Dez-16 A

COLD COMMISSIONING GENERATOR 32MKQ WASTE GAS SYSTEM

MANUFACTURING GT GENERATOR 32MKA TRANSPORT GT GENERATO R 32MKA CHARLESTON - SITE SUMMARY INSTALLATION GEN 32 (INCL. PREPARATION FOUNDATIO N) 32MKA PLACING GENERATOR 32MKA COLD COMMISSIONING GENERATOR 32MKW SEAL OIL SYSTEM


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

Layout Name : EG1019_Level2 Dur.

3d

Start

Finish

SI32MKA8-25

COLD COMMISSIONING GENERATOR 32MKA

27-Dez-16 A

29-Dez-16 A

SI32MKA8-26

GENERATOR 32MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 2d 04-Feb-17 A

05-Feb-17 A

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 9 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 COLD COMMISSIONING GENERATOR 32MKA GENERATOR 32MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE)

593d

01-Jun-15 A

315d

01-Jun-15 A

10-Apr-16 A

42d

29-Apr-16 A

09-Jun-16 A

OC31MKA6-15#

SUMMARY INS TALLATION GEN31 (INCL. PREPARATION FOUNDATION) 176d 31MKA 18-Jun-16 A

10-Dez-16 A

SI31MKA6-10

PLACING GENERATOR 31MKA

0d

18-Jul-16 A

SI31MKW8-25

COLD COMMISSIONING GENERATOR 31MKW SEAL OIL SYSTEM

5d

27-Dez-16 A

31-Dez-16 A

SI31MKA8-25

COLD COMMISSIONING GENERATOR 31MKA

3d

27-Dez-16 A

29-Dez-16 A

SI31MKQ8-25

COLD COMMISSIONING GENERATOR 31MKQ WASTE GAS SYSTEM

2d

27-Dez-16 A

28-Dez-16 A

COLD COMMISSIONING GENERATOR 31MKQ WASTE GAS SYSTEM

SI31MKG8-25

COLD COMMISSIONING GENERATOR 31MKG GAS SUPPLY SYSTEM

5d

27-Dez-16 A

31-Dez-16 A

COLD COMMISSIONING GENERATOR 31MKG GAS SUPPLY SYSTEM

SI31MKA8-26

GENERATOR 31MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 0d 14-Jan-17 A

14-Jan-17 A

UNIT 31 SP31MKA3-25

MANUFACTURING GT GENERATOR 31MKA

SI31MKA4-21

TRANSPORT GT GENERATO R 31MKA CHARLESTON - SITE

Block 2 UNIT 22

14-Jan-17 A MANUFACTURING GT GENERATOR 31MKA TRANSPORT GT GENERATO R 31MKA CHARLESTON - SITE SUMMARY INS TALLATION GEN31 (INCL. PREPARATION FOUNDATION) 31MKA PLACING GENERATOR 31MKA

655d

14-Aug-15 A

646d

21-Aug-15 A

27-Mai-17 A

353d

21-Aug-15 A

07-Aug-16 A

33d

COLD COMMISSIONING GENERATOR 31MKW SEAL OIL SYSTEM COLD COMMISSIONING GENERATOR 31MKA

GENERATOR 31MKA - LEAKGE TEST & H2 FILLING ( INKL. ARGON PURGE)

29-Mai-17 A

SP22MKA3-25

MANUFACTURING GT GENERATOR 22MKA

SI22MKA4-21

TRANSPORT GT GENERATO R 22MKA NSP - SITE

07-Okt-16 A

08-Nov-16 A

OC22MKA6-15#

SUMMARY INS TALLATION GEN 22 (INCL. PREPARATION FOUNDATIO N) 193d 22MKA 29-Okt-16 A

09-Mai-17 A

SI22MKA6-10

PLACING GENERATOR 22MKA

0d

23-Nov-16 A

SI22MKA8-25

COLD COMMISSIONING GENERATOR 22MKA

3d

18-Mai-17 A

20-Mai-17 A

SI22MKW8-25

COLD COMMISSIONING GENERATOR 22MKW SEAL OIL SYSTEM

3d

20-Mai-17 A

22-Mai-17 A

COLD COMMISSIONING GENERATOR 22MKW SEAL OIL SYSTEM

SI22MKG8-25

COLD COMMISSIONING GENERATOR 22MKG GAS SUPPLY SYSTEM

3d

21-Mai-17 A

23-Mai-17 A

COLD COMMISSIONING GENERATOR 22MKG GAS SUPPLY SYSTEM

SI22MKQ8-25

COLD COMMISSIONING GENERATOR 22MKQ WASTE GAS SYSTEM

3d

25-Mai-17 A

27-Mai-17 A

COLD COMMISSIONING GENERATOR 22MKQ WASTE GAS SYSTEM

SI22MKA8-26

GENERATOR 22MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 1d 27-Mai-17 A

27-Mai-17 A

GENERATOR 22MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE)

UNIT 21

MANUFACTURING GT GENERATOR 22MKA TRANSPORT GT GENERATO R 22MKA NSP - SITE SUMMARY INS TALLATION GEN 22 (INCL. PREPARATION FOUNDATIO N) 22MKA PLACING GENERATOR 22MKA

655d

14-Aug-15 A

29-Mai-17 A

391d

14-Aug-15 A

07-Sep-16 A

24d

COLD COMMISSIONING GENERATOR 22MKA

SP21MKA3-25

MANUFACTURING GT GENERATOR 21MKA

SI21MKA4-21

TRANSPORT GT GENERATO R 21MKA NSP - SITE

09-Okt-16 A

02-Nov-16 A

OC21MKA6-15#

SUMMARY INS TALLATION GEN21 (INCL. PREPARATION FOUNDATION) 207d 21MKA15-Okt-16 A

09-Mai-17 A

SI21MKA6-10

PLACING GENERATOR 21MKA

0d

28-Nov-16 A

SI21MKW8-25

COLD COMMISSIONING GENERATOR 21MKW SEAL OIL SYSTEM

3d

18-Mai-17 A

20-Mai-17 A

SI21MKA8-25

COLD COMMISSIONING GENERATOR 21MKA

3d

18-Mai-17 A

20-Mai-17 A

SI21MKG8-25

COLD COMMISSIONING GENERATOR 21MKG GAS SUPPLY SYSTEM

3d

21-Mai-17 A

23-Mai-17 A

COLD COMMISSIONING GENERATOR 21MKG GAS SUPPLY SYSTEM

SI21MKQ8-25

COLD COMMISSIONING GENERATOR 21MKQ WASTE GAS SYSTEM

1d

27-Mai-17 A

27-Mai-17 A

COLD COMMISSIONING GENERATOR 21MKQ WASTE GAS SYSTEM

SI21MKA8-27

GENERATOR 21MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 3d 27-Mai-17 A

29-Mai-17 A

GENERATOR 21MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE)

Block 1 UNIT 11

MANUFACTURING GT GENERATOR 21MKA TRANSPORT GT GENERATO R 21MKA NSP - SITE SUMMARY INSTALLATION GEN21 (INCL. PREPARATION FOUNDATION) 21MKA PLACING GENERATOR 21MKA

639d

11-Jan-16 A

636d

11-Jan-16 A

07-Okt-17

337d

11-Jan-16 A

13-Dez-16 A

33d

22-Dez-16 A

23-Jan-17 A

COLD COMMISSIONING GENERATOR 21MKW SEAL OIL SYSTEM COLD COMMISSIONING GENERATOR 21MKA

10-Okt-17

SP11MKA3-25

MANUFACTURING GT GENERATOR 11MKA

SI11MKA4-21

TRANSPORT GT GENERATO R 11MKA NS P - SITE

OC11MKA6-15#

SUMMARY INS TALLATION GEN11 (INCL. PREPARATIO N FO UNDATION) 224d 11MKA05-Jan-17 A

SI11MKA6-10

PLACING GENERATOR 11MKA

0d

15-Apr-17 A

SI11MKW8-25

COLD COMMISSIONING GENERATOR 11MKW SEAL OIL SYSTEM

8d

11-Sep-17

18-Sep-17

SI11MKA8-25

COLD COMMISSIONING GENERATOR 11MKA

3d

19-Sep-17

21-Sep-17

SI11MKG8-26

COLD COMMISSIONING GENERATOR 11MKG GAS SUPPLY SYSTEM

5d

22-Sep-17

26-Sep-17

COLD COMMISSIONING GENERATOR 11MKG GAS SUPPLY SYSTEM

SI11MKQ8-25

COLD COMMISSIONING GENERATOR 11MKQ WASTE GAS SYSTEM

3d

27-Sep-17

29-Sep-17

COLD COMMISSIONING GENERATOR 11MKQ WASTE GAS SYSTEM

SI11MKA8-26

GENERATOR 11MKA - LEAKGE TEST & H2 FILLING ( INKL. ARGON PURGE) 5d

03-Okt-17

07-Okt-17

596d

23-Feb-16 A

10-Okt-17

328d

23-Feb-16 A

15-Jan-17 A

UNIT 12 SP12MKA3-25

MANUFACTURING GT GENERATOR 12MKA

OC12MKA6-15#

SUMMARY INS TALLATION GEN 12 (INCL. PREPARATION FOUNDATIO N) 231d 12MKA 23-Dez-16 A

SI12MKA4-21

TRANSPORT GT GENERATO R 12MKA NSP - SITE

SI12MKA6-10 SI12MKW8-25

MANUFACTURING GT GENERATOR 11MKA TRANSPORT GT GENERATO R 11MKA NSP - SITE

16-Aug-17

SUMMARY INSTALLATION GEN11 (INCL. PREPARATIO N FO UNDATION) 11MKA PLACING GENERATOR 11MKA COLD COMMISSIONING GENERATOR 11MKW SEAL OIL SYSTEM COLD COMMISSIONING GENERATOR 11MKA

GENERATOR 11MKA - LEAKGE TEST & H2 FILLING ( INKL. ARGON PURGE)

MANUFACTURING GT GENERATOR 12MKA

10-Aug-17

SUMMARY INS TALLATION GEN 12 (INCL. PREPARATION FOUNDATIO N) 12MKA

19d

23-Jan-17 A

PLACING GENERATOR 12MKA

0d

31-Mrz-17 A

COLD COMMISSIONING GENERATOR 12MKW SEAL OIL SYSTEM

8d

11-Sep-17

18-Sep-17

SI12MKA8-25

COLD COMMISSIONING GENERATOR 12MKA

3d

19-Sep-17

21-Sep-17

SI12MKG8-25

COLD COMMISSIONING GENERATOR 12MKG GAS SUPPLY SYSTEM

5d

28-Sep-17

02-Okt-17

COLD COMMISSIONING GENERATOR 12MKG GAS SUPPLY SYSTEM

SI12MKQ8-25

COLD COMMISSIONING GENERATOR 12MKQ WASTE GAS SYSTEM

3d

03-Okt-17

05-Okt-17

COLD COMMISSIONING GENERATOR 12MKQ WASTE GAS SYSTEM

SI12MKA8-26

GENERATOR 12MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE) 5d

06-Okt-17

10-Okt-17

GENERATOR 12MKA - LEAKGE TE ST & H2 FILLING ( INKL. ARGON PURGE)

197d

07-Mrz-16 A

20-Sep-16 A

39d

07-Mrz-16 A

15-Apr-16 A

39d

07-Mrz-16 A

15-Apr-16 A

39d

07-Mrz-16 A

15-Apr-16 A

45d

16-Mai-16 A

30-Jun-16 A

45d

16-Mai-16 A

30-Jun-16 A

45d

16-Mai-16 A

30-Jun-16 A

54d

28-Jul-16 A

20-Sep-16 A

54d

28-Jul-16 A

20-Sep-16 A

54d

28-Jul-16 A

20-Sep-16 A

168d

04-Dez-15 A

20-Mai-16 A

44d

04-Dez-15 A

17-Jan-16 A

24d

24-Dez-15 A

17-Jan-16 A

24d

24-Dez-15 A

17-Jan-16 A

38d

04-Dez-15 A

11-Jan-16 A

38d

04-Dez-15 A

11-Jan-16 A

49d

20-Dez-15 A

07-Feb-16 A

39d

30-Dez-15 A

07-Feb-16 A

39d

30-Dez-15 A

07-Feb-16 A

Piling for Fin Fan Cooler Area Block 4 COMMON OC4-URB5-46

PILING WORK 42/41 URB02 + TESTING

Block 3 COMMON OC3-URB5-47

PILING WORK 32/31 URB02 + TESTING

Block 2 COMMON OC2-URB5-48

PILING WORK 22/21 URB02 + TESTING

Piling for Exhaust Gas System Block 4 UNIT 42 OC42UHN5-00

PILING 42UHN + TESTING

UNIT 41 OC41UHN5-00

PILING 41UHN + TESTING

Block 3 UNIT 32 OC32UHN5-00

PILING 32UHN + TESTING

10-Feb-17 A

TRANSPORT GT GENERATO R 12MKA NSP - SITE PLACING GENERATOR 12MKA COLD COMMISSIONING GENERATOR 12MKW SEAL OIL SYSTEM COLD COMMISSIONING GENERATOR 12MKA

PILING WORK 42/41 URB02 + TESTING

PILING WORK 32/31 URB02 + TESTING

PILING WORK 22/21 URB02 + TESTING

PILING 42UHN + TESTING

PILING 41UHN + TESTING

PILING 32UHN + TESTING


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

UNIT 31 OC31UHN5-00

PILING 31UHN + TESTING

Block 2 UNIT 22 OC22UHN5-00

PILING 22UHN + TESTING

UNIT 21 OC21UHN5-00

PILING 21UHN + TESTING

Block 1 UNIT 11 OC11UHN5-00

PILING 11UHN + TESTING

UNIT 12 OC12UHN5-00

PILING 12UHN + TESTING

Piling UMB Area Block 4 GENERAL OC4-UMB5-00

PILING BUILDING FOUNDATION 41/42UMB + TESTING

UNIT 42

Layout Name : EG1019_Level2 Dur.

Start

Finish

23d

20-Dez-15 A

12-Jan-16 A

23d

20-Dez-15 A

12-Jan-16 A

49d

09-Feb-16 A

29-Mrz-16 A

47d

11-Feb-16 A

29-Mrz-16 A

47d

11-Feb-16 A

29-Mrz-16 A

31d

09-Feb-16 A

11-Mrz-16 A

31d

09-Feb-16 A

11-Mrz-16 A

37d

13-Apr-16 A

20-Mai-16 A

35d

15-Apr-16 A

20-Mai-16 A

35d

15-Apr-16 A

20-Mai-16 A

22d

13-Apr-16 A

05-Mai-16 A

22d

13-Apr-16 A

05-Mai-16 A

277d

21-Okt-15 A

24-Jul-16 A

190d

21-Okt-15 A

28-Apr-16 A

73d

21-Okt-15 A

02-Jan-16 A

73d

21-Okt-15 A

02-Jan-16 A

165d

10-Nov-15 A

23-Apr-16 A

OC42UMB5A00

PILING GT-SET FOUNDATION 42UMB + TESTING

53d

10-Nov-15 A

02-Jan-16 A

OC42UBF5-00

PILING 42UBE/UBF + TESTING

44d

29-Jan-16 A

13-Mrz-16 A

OC42UAH5-00

PILING 42UAH + TESTING (STO NE COLUMNS)

2d

21-Apr-16 A

23-Apr-16 A

166d

14-Nov-15 A

28-Apr-16 A

UNIT 41 OC41UMB5-00

PILING GT-SET FOUNDATION 41UMB + TESTING

35d

14-Nov-15 A

19-Dez-15 A

OC41UBF5-00

PILING 41UBE/UBF + TESTING

34d

24-Dez-15 A

27-Jan-16 A

OC41UAH5-00

PILING 41UAH + TESTING (STO NE COLUMNS)

2d

26-Apr-16 A

28-Apr-16 A

196d

27-Okt-15 A

10-Mai-16 A

80d

27-Okt-15 A

15-Jan-16 A

80d

27-Okt-15 A

15-Jan-16 A

144d

14-Dez-15 A

06-Mai-16 A

Block 3 GENERAL OC3-UMB5-00

PILING BUILDING FOUNDATION 31/32UMB + TESTING

UNIT 32

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 10 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 PILING 31UHN + TESTING

PILING 22UHN + TESTING

PILING 21UHN + TESTING

PILING 11UHN + TESTING

PILING 12UHN + TESTING

PILING BUILDING FOUNDATION 41/42UMB + TESTING

PILING GT-SET FOUNDATION 42UMB + TESTING PILING 42UBE/UBF + TESTING PILING 42UAH + TESTING (STO NE COLUMNS)

PILING GT-SET FOUNDATION 41UMB + TESTING PILING 41UBE/UBF + TESTING PILING 41UAH + TESTING (STO NE COLUMNS)

PILING BUILDING FOUNDATION 31/32UMB + TESTING

OC32UMB5A00

PILING GT-SET FOUNDATION 32UMB + TESTING

13d

14-Dez-15 A

27-Dez-15 A

PILING GT-SET FOUNDATION 32UMB + TESTING

OC32UBF5-00

PILING 32UBE/UBF + TESTING

18d

31-Mrz-16 A

18-Apr-16 A

PILING 32UBE/UBF + TESTING

OC32UAH5-00

PILING 32UAH + TESTING (STO NE COLUMNS)

1d

05-Mai-16 A

06-Mai-16 A

130d

01-Jan-16 A

10-Mai-16 A

UNIT 31 OC31UMB5-00

PILING GT-SET FOUNDATION 31UMB + TESTING

14d

01-Jan-16 A

15-Jan-16 A

OC31UBF5-00

PILING 31UBE/UBF + TESTING

23d

01-Jan-16 A

24-Jan-16 A

OC31UAH5-00

PILING 31UAH + TESTING (STO NE COLUMNS)

1d

09-Mai-16 A

10-Mai-16 A

137d

03-Jan-16 A

19-Mai-16 A

64d

09-Feb-16 A

13-Apr-16 A

64d

09-Feb-16 A

13-Apr-16 A

113d

25-Jan-16 A

17-Mai-16 A

Block 2 GENERAL OC2-UMB5-00

PILING BUILDING FOUNDATION 21/22UMB + TESTING

UNIT 22 OC22UMB5A00

PILING GT-SET FOUNDATION 22UMB + TESTING

15d

25-Jan-16 A

09-Feb-16 A

OC22UBF5-00

PILING 22UBE/UBF + TESTING

19d

29-Jan-16 A

17-Feb-16 A

OC22UAH5-00

PILING 22UAH + TESTING (STO NE COLUMNS)

1d

16-Mai-16 A

17-Mai-16 A

137d

03-Jan-16 A

19-Mai-16 A

UNIT 21

PILING 32UAH + TESTING (STO NE COLUMNS)

PILING GT-SET FOUNDATION 31UMB + TESTING PILING 31UBE/UBF + TESTING PILING 31UAH + TESTING (STO NE COLUMNS)

PILING BUILDING FOUNDATION 21/22UMB + TESTING

PILING GT-SET FOUNDATION 22UMB + TESTING PILING 22UBE/UBF + TESTING PILING 22UAH + TESTING (STO NE COLUMNS)

OC21UBF5-00

PILING 21UBE/UBF + TESTING

24d

03-Jan-16 A

27-Jan-16 A

PILING 21UBE/UBF + TESTING

OC21UMB5-00

PILING GT-SET FOUNDATION 21UMB + TESTING

38d

07-Mrz-16 A

14-Apr-16 A

PILING GT-SET FOUNDATION 21UMB + TESTING

OC21UAH5-00

PILING 21UAH + TESTING (STO NE COLUMNS)

1d

18-Mai-16 A

19-Mai-16 A

199d

07-Jan-16 A

24-Jul-16 A

53d

13-Mrz-16 A

05-Mai-16 A

53d

13-Mrz-16 A

05-Mai-16 A

144d

07-Jan-16 A

30-Mai-16 A

Block 1 GENERAL OC1-UMB5-00

PILING BUILDING FOUNDATION 11/12UMB + TESTING

UNIT 11

PILING 21UAH + TESTING (STO NE COLUMNS)

PILING BUILDING FOUNDATION 11/12UMB + TESTING

OC11UBF5-00

PILING 11UBE/UBF + TESTING

16d

07-Jan-16 A

23-Jan-16 A

OC11UMB5-00

PILING GT-SET FOUNDATION 11UMB + TESTING

31d

06-Mrz-16 A

06-Apr-16 A

PILING GT-SET FOUNDATION 11UMB + TESTING

OC11UAH5-00

PILING 11UAH + TESTING (STONE COLUMNS)

PILING 11UAH + TESTING (STONE COLUMNS)

UNIT 12

1d

29-Mai-16 A

30-Mai-16 A

146d

29-Feb-16 A

24-Jul-16 A

PILING 11UBE/UBF + TESTING

OC12UBF5-00

PILING 12UBE/UBF + TESTING

39d

29-Feb-16 A

24-Jul-16 A

PILING 12UBE/UBF + TESTING

OC12UMB5A00

PILING GT-SET FOUNDATION 12UMB + TESTING

44d

05-Mrz-16 A

18-Apr-16 A

PILING GT-SET FOUNDATION 12UMB + TESTING

OC12UAH5-00

PILING 12UAH + TESTING (STO NE COLUMNS)

PILING 12UAH + TESTING (STO NE COLUMNS)

2d

03-Jun-16 A

05-Jun-16 A

Concrete Structure for PCCs UBA3110/3210/3310/3410/3510 + UBD134d

10-Feb-16 A

23-Jun-16 A

28d

13-Mrz-16 A

10-Apr-16 A

0d

13-Mrz-16 A

13-Mrz-16 A

Block 4 UNIT 42 OC42UBA5-45

(RFE) FOUNDATION 42UBA/UBD

0d

UNIT 41 OC41UBA5-45

(RFE) FOUNDATION 41UBA/UBD

Block 3 UNIT 32 OC32UBA5-45

(RFE) FOUNDATION 32UBA/UBD

(RFE) FOUNDATION 31UBA/UBD

Block 2 UNIT 22 OC22UBA5-45

(RFE) FOUNDATION 22UBA/UBD

OC21UBA5-45

Block 1 UNIT 11

10-Apr-16 A

42d

12-Mai-16 A

23-Jun-16 A

0d

12-Mai-16 A

12-Mai-16 A

23-Jun-16 A

23-Jun-16 A

0d

(RFE) FOUNDATION 21UBA/UBD

10-Apr-16 A

0d

12-Mai-16 A

0d

23-Jun-16 A

5d

10-Feb-16 A

15-Feb-16 A

0d

15-Feb-16 A

15-Feb-16 A

0d 0d

UNIT 21

13-Mrz-16 A 10-Apr-16 A

0d

UNIT 31 OC31UBA5-45

0d

15-Feb-16 A 10-Feb-16 A

0d

(RFE) FOUNDATION 42UBA/UBD

(RFE) FOUNDATION 41UBA/UBD

(RFE) FOUNDATION 32UBA/UBD

(RFE) FOUNDATION 31UBA/UBD

(RFE) FOUNDATION 22UBA/UBD

10-Feb-16 A 10-Feb-16 A

7d

26-Mrz-16 A

02-Apr-16 A

0d

26-Mrz-16 A

26-Mrz-16 A

(RFE) FOUNDATION 21UBA/UBD


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

OC11UBA5-45

Activity Name

(RFE) FOUNDATION 11UBA/UBD

Dur.

(RFE) FOUNDATION 12UBA/UBD

Structures for Generator Transformer UBF Block 4 UNIT 42

Start

0d 0d

UNIT 12 OC12UBA5-45

Layout Name : EG1019_Level2 Finish

26-Mrz-16 A 02-Apr-16 A

02-Apr-16 A

384d

29-Jan-16 A

15-Feb-17 A

137d

04-Feb-16 A

19-Jun-16 A

101d

10-Mrz-16 A

19-Jun-16 A 13-Mrz-16 A

0d

WORK PREPARATION, EXCAVATION 42UBE/UBF

3d

10-Mrz-16 A

OC42UBF5-10

(H) START PLACING FORMWORK 42UBE/UBF

0d

27-Mrz-16 A

OC42UBF5-15

CONSTRUCTION FOUNDATION 42UBE/UBF

23d

27-Mrz-16 A

19-Apr-16 A

OC42UBF5-25

WALLS & PADS 42UBE/UBF

31d

23-Apr-16 A

24-Mai-16 A

OC42UBF5E15

OIL RESISTANT PAINT 42UBE/UBF

12d

07-Jun-16 A

19-Jun-16 A

137d

04-Feb-16 A

19-Jun-16 A

11d

04-Feb-16 A

15-Feb-16 A

0d

17-Feb-16 A

WORK PREPARATION, EXCAVATION 41UBE/UBF

OC41UBF5-10

(H) START PLACING FORMWORK 41UBE/UBF

OC41UBF5-15

CONSTRUCTION FOUNDATION 41UBE/UBF

80d

17-Feb-16 A

07-Mai-16 A

OC41UBF5-25

WALLS & PADS 41UBE/UBF

29d

17-Apr-16 A

16-Mai-16 A

OC41UBF5E15

OIL RESISTANT PAINT 41UBE/UBF

14d

06-Jun-16 A

19-Jun-16 A

182d

29-Jan-16 A

29-Jul-16 A

WORK PREPARATION, EXCAVATION 42UBE/UBF

CONSTRUCTION FOUNDATION 42UBE/UBF WALLS & PADS 42UBE/UBF OIL RESISTANT PAINT 42UBE/UBF

WORK PREPARATION, EXCAVATION 41UBE/UBF (H) START PLACING FORMWORK 41UBE/UBF

95d

23-Apr-16 A

27-Jul-16 A

OC32UBF5-05

WORK PREPARATION, EXCAVATION 32UBE/UBF

2d

23-Apr-16 A

25-Apr-16 A

OC32UBF5-10

(H) START PLACING FORMWORK 32UBE/UBF

0d

02-Mai-16 A

OC32UBF5-15

CONSTRUCTION FOUNDATION 32UBE/UBF

7d

02-Mai-16 A

09-Mai-16 A

OC32UBF5-25

WALLS & PADS 32UBE/UBF

14d

11-Mai-16 A

25-Mai-16 A

OC32UBF5E15

OIL RESISTANT PAINT 32UBE/UBF

50d

07-Jun-16 A

27-Jul-16 A

182d

29-Jan-16 A

29-Jul-16 A

13d

29-Jan-16 A

11-Feb-16 A

0d

11-Feb-16 A

UNIT 31

(RFE) FOUNDATION 12UBA/UBD

(H) START PLACING FORMWORK 42UBE/UBF

OC41UBF5-05

Block 3 UNIT 32

(RFE) FOUNDATION 11UBA/UBD

02-Apr-16 A

OC42UBF5-05

UNIT 41

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 11 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

CONSTRUCTION FOUNDATION 41UBE/UBF WALLS & PADS 41UBE/UBF OIL RESISTANT PAINT 41UBE/UBF

WORK PREPARATION, EXCAVATION 32UBE/UBF (H) START PLACING FORMWORK 32UBE/UBF CONSTRUCTION FOUNDATION 32UBE/UBF WALLS & PADS 32UBE/UBF OIL RESISTANT PAINT 32UBE/UBF

OC31UBF5-05

WORK PREPARATION, EXCAVATION 31UBE/UBF

OC31UBF5-10

(H) START PLACING FORMWORK 31UBE/UBF

OC31UBF5-15

CONSTRUCTION FOUNDATION 31UBE/UBF

67d

11-Feb-16 A

18-Apr-16 A

CONSTRUCTION FOUNDATION 31UBE/UBF

OC31UBF5-25

WALLS & PADS 31UBE/UBF

96d

17-Feb-16 A

23-Mai-16 A

WALLS & PADS 31UBE/UBF

OC31UBF5E15

OIL RESISTANT PAINT 31UBE/UBF

53d

06-Jun-16 A

29-Jul-16 A

200d

17-Feb-16 A

04-Sep-16 A

Block 2 UNIT 22

(H) START PLACING FORMWORK 31UBE/UBF

174d

18-Feb-16 A

10-Aug-16 A

OC22UBF5-05

WORK PREPARATION, EXCAVATION 22UBE/UBF

1d

18-Feb-16 A

19-Feb-16 A

OC22UBF5-10

(H) START PLACING FORMWORK 22UBE/UBF

0d

20-Feb-16 A

OC22UBF5-15

CONSTRUCTION FOUNDATION 22UBE/UBF

43d

20-Feb-16 A

03-Apr-16 A

OC22UBF5-25

WALLS & PADS 22UBE/UBF

25d

12-Apr-16 A

07-Mai-16 A

OC22UBF5E15

OIL RESISTANT PAINT 22UBE/UBF

18d

23-Jul-16 A

10-Aug-16 A

200d

17-Feb-16 A

04-Sep-16 A

10d

17-Feb-16 A

27-Feb-16 A

0d

22-Feb-16 A

UNIT 21 WORK PREPARATION, EXCAVATION 21UBE/UBF

OC21UBF5-10

(H) START PLACING FORMWORK 21UBE/UBF

OC21UBF5-15

CONSTRUCTION FOUNDATION 21UBE/UBF

75d

22-Feb-16 A

07-Mai-16 A

OC21UBF5-25

WALLS & PADS 21UBE/UBF

33d

05-Mai-16 A

07-Jun-16 A

OC21UBF5E15

OIL RESISTANT PAINT 21UBE/UBF

8d

27-Aug-16 A

04-Sep-16 A

369d

13-Feb-16 A

15-Feb-17 A

369d

13-Feb-16 A

15-Feb-17 A

42d

13-Feb-16 A

26-Mrz-16 A

0d

13-Mrz-16 A

WORK PREPARATION, EXCAVATION 11UBE/UBF

OC11UBF5-10

(H) START PLACING FORMWORK 11UBE/UBF

OC11UBF5-15

CONSTRUCTION FOUNDATION 11UBE/UBF

55d

13-Mrz-16 A

07-Mai-16 A

OC11UBF5-25

WALLS & PADS 11UBE/UBF

37d

22-Mai-16 A

28-Jun-16 A

OC11UBF5E15

OIL RESISTANT PAINT 11UBE/UBF

11d

05-Feb-17 A

15-Feb-17 A

171d

03-Aug-16 A

20-Jan-17 A 06-Aug-16 A

WORK PREPARATION, EXCAVATION 12UBE/UBF

3d

03-Aug-16 A

OC12UBF5-10

(H) START PLACING FORMWORK 12UBE/UBF

0d

31-Aug-16 A

OC12UBF5-15

CONSTRUCTION FOUNDATION 12UBE/UBF

8d

31-Aug-16 A

08-Sep-16 A

OC12UBF5-25

WALLS & PADS 12UBE/UBF

17d

14-Sep-16 A

30-Sep-16 A

OC12UBF5E15

OIL RESISTANT PAINT 12UBE/UBF

70d

12-Nov-16 A

20-Jan-17 A

809d

10-Aug-15 A

26-Okt-17

484d

10-Aug-15 A

05-Dez-16 A

477d

10-Aug-15 A

28-Nov-16 A

Block 4 UNIT 42 MANUFACTURING, SHOP TEST MAIN TRANSFORMER 42BAT *

273d

10-Aug-15 A

08-Mai-16 A

SI42BAT4-25

TRANSPORT MAIN TRANSFORMER CONSTANZA-SITE 42BAT *

34d

09-Mai-16 A

11-Jun-16 A

OC42BAT7-15

ERECTION GENERATOR TRANSFORMERS 42BAT

84d

21-Jul-16 A

13-Okt-16 A

SI42BAT8-25

COMMISSIONING MAIN TRANSFORMER 42BAT

7d

22-Nov-16 A

28-Nov-16 A

484d

10-Aug-15 A

05-Dez-16 A

SI41BAT3-25

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 41BAT *

273d

10-Aug-15 A

08-Mai-16 A

SI41BAT4-25

TRANSPORT MAIN TRANSFORMER CONSTANZA-SITE 41BAT *

34d

09-Mai-16 A

11-Jun-16 A

OC41BAT7-15

ERECTION GENERATOR TRANSFORMERS 41BAT

93d

21-Jul-16 A

22-Okt-16 A

SI41BAT8-25

COMMISSIONING MAIN TRANSFORMER 41BAT

7d

29-Nov-16 A

05-Dez-16 A

471d

09-Sep-15 A

22-Dez-16 A

461d

09-Sep-15 A

12-Dez-16 A

274d

09-Sep-15 A

08-Jun-16 A

Block 3 UNIT 32

WALLS & PADS 22UBE/UBF OIL RESISTANT PAINT 22UBE/UBF

WORK PREPARATION, EXCAVATION 21UBE/UBF

CONSTRUCTION FOUNDATION 21UBE/UBF WALLS & PADS 21UBE/UBF OIL RESISTANT PAINT 21UBE/UBF

WORK PREPARATION, EXCAVATION 11UBE/UBF

CONSTRUCTION FOUNDATION 11UBE/UBF WALLS & PADS 11UBE/UBF OIL RESISTANT PAINT 11UBE/UBF

WORK PREPARATION, EXCAVATION 12UBE/UBF (H) START PLACING FORMWORK 12UBE/UBF

SI42BAT3-25

UNIT 41

CONSTRUCTION FOUNDATION 22UBE/UBF

(H) START PLACING FORMWORK 11UBE/UBF

OC12UBF5-05

Transformer for GT BAT

WORK PREPARATION, EXCAVATION 22UBE/UBF

(H) START PLACING FORMWORK 21UBE/UBF

OC11UBF5-05

UNIT 12

OIL RESISTANT PAINT 31UBE/UBF

(H) START PLACING FORMWORK 22UBE/UBF

OC21UBF5-05

Block 1 UNIT 11

WORK PREPARATION, EXCAVATION 31UBE/UBF

SI32BAT3-25

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 32BAT *

SI32BAT4-25

TRANSPORT MAIN TRANSFORMER NSP-SITE 32BAT *

32d

09-Jun-16 A

10-Jul-16 A

OC32BAT7-15

ERECTION GENERATOR TRANSFORMERS 32BAT

87d

21-Jul-16 A

16-Okt-16 A

CONSTRUCTION FOUNDATION 12UBE/UBF WALLS & PADS 12UBE/UBF OIL RESISTANT PAINT 12UBE/UBF

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 42BAT * TRANSPORT MAIN TRANSFORMER CONSTANZA-SITE 42BAT * ERECTION GENERATOR TRANSFORMERS 42BAT COMMISSIONING MAIN TRANSFORMER 42BAT

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 41BAT * TRANSPORT MAIN TRANSFORMER CONSTANZA-SITE 41BAT * ERECTION GENERATOR TRANSFORMERS 41BAT COMMISSIONING MAIN TRANSFORMER 41BAT

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 32BAT * TRANSPORT MAIN TRANSFORMER NSP-SITE 32BAT * ERECTION GENERATOR TRANSFORMERS 32BAT


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

SI32BAT8-25

Activity Name

COMMISSIONING MAIN TRANSFORMER 32BAT

UNIT 31

Layout Name : EG1019_Level2 Dur.

Start

Finish

5d

08-Dez-16 A

12-Dez-16 A

471d

09-Sep-15 A

22-Dez-16 A

SI31BAT3-25

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 31BAT *

274d

09-Sep-15 A

08-Jun-16 A

SI31BAT4-25

TRANSPORT MAIN TRANSFORMER NSP-SITE 31BAT *

32d

09-Jun-16 A

10-Jul-16 A

OC31BAT7-15

ERECTION GENERATOR TRANSFORMERS 31BAT

97d

19-Jul-16 A

24-Okt-16 A

SI31BAT8-25

COMMISSIONING MAIN TRANSFORMER 31BAT

5d

18-Dez-16 A

22-Dez-16 A

484d

02-Jan-16 A

30-Apr-17 A

484d

02-Jan-16 A

29-Apr-17 A

264d

02-Jan-16 A

21-Sep-16 A

Block 2 UNIT 22 SI22BAT3-25

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 22BAT *

SI22BAT4-25

TRANSPORT MAIN TRANSFORMER NSP-SITE 22BAT *

16d

22-Sep-16 A

07-Okt-16 A

OC22BAT7-15

ERECTION GENERATOR TRANSFORMERS 22BAT

62d

16-Dez-16 A

16-Feb-17 A

SI22BAT8-25

COMMISSIONING MAIN TRANSFORMER 22BAT

7d

23-Apr-17 A

29-Apr-17 A

484d

02-Jan-16 A

30-Apr-17 A

264d

UNIT 21 SI21BAT3-25

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 21BAT *

02-Jan-16 A

21-Sep-16 A

SI11BAT3-25

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 11BAT * (TO BE271d USED FOR 16-Mai-16 21BAT) A

10-Feb-17 A

SI21BAT4-25

TRANSPORT MAIN TRANSFORMER NSP-SITE 21BAT *

22-Sep-16 A

07-Okt-16 A

SI11BAT4-25

TRANSPORT MAIN TRANSFORMER NSP-SITE 11BAT *(TO BE USED FOR 32d21BAT) 11-Feb-17 A

14-Mrz-17 A

OC21BAT7-15

ERECTION GENERATOR TRANSFORMERS 21BAT

SI21BAT8-25

COMMISSIONING MAIN TRANSFORMER 21BAT

Block 1 UNIT 11

16d

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 12 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 COMMISSIONING MAIN TRANSFORMER 32BAT

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 31BAT * TRANSPORT MAIN TRANSFORMER NSP-SITE 31BAT * ERECTION GENERATOR TRANSFORMERS 31BAT COMMISSIONING MAIN TRANSFORMER 31BAT

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 22BAT * TRANSPORT MAIN TRANSFORMER NSP-SITE 22BAT * ERECTION GENERATOR TRANSFORMERS 22BAT COMMISSIONING MAIN TRANSFORMER 22BAT

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 21BAT * MANUFACTURING, SHOP TEST MAIN TRANSFORMER 11BAT * (TO BE USED FOR 21BAT) TRANSPORT MAIN TRANSFORMER NSP-SITE 21BAT * TRANSPORT MAIN TRANSFORMER NSP-SITE 11BAT *(TO BE USED FOR 21BAT)

37d

15-Mrz-17 A

20-Apr-17 A

ERECTION GENERATOR TRANSFORMERS 21BAT

6d

24-Apr-17 A

30-Apr-17 A

COMMISSIONING MAIN TRANSFORMER 21BAT

529d

16-Mai-16 A

26-Okt-17

437d

16-Mai-16 A

26-Jul-17 MANUFACTURING, SHOP TEST MAIN TRANSFORMER 11BAT * (NEW TRAFO)

SI11BAT3-81

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 11BAT * (NEW TRAFO) 370d 16-Mai-16 A

20-Mai-17 A

SI11BAT4-42

TRANSPORT MAIN TRANSFORMER NSP-SITE 11BAT (NEW TRAFO)

25d

21-Mai-17 A

14-Jun-17 A

OC11BAT7-15

ERECTION GENERATOR TRANSFORMERS 11BAT

22d

26-Jun-17 A

18-Jul-17 A

ERECTION GENERATOR TRANSFORMERS 11BAT

SI11BAT8-25

COMMISSIONING MAIN TRANSFORMER 11BAT

7d

20-Jul-17 A

26-Jul-17

COMMISSIONING MAIN TRANSFORMER 11BAT

432d

16-Mai-16 A

21-Jul-17 A

UNIT 12

TRANSPORT MAIN TRANSFORMER NSP-SITE 11BAT (NEW TRAFO)

SI12BAT3-25

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 12BAT *

271d

16-Mai-16 A

10-Feb-17 A

SI12BAT4-25

TRANSPORT MAIN TRANSFORMER NSP-SITE 12BAT

32d

11-Feb-17 A

14-Mrz-17 A

OC12BAT7-15

ERECTION GENERATOR TRANSFORMERS 12BAT

42d

24-Mai-17 A

04-Jul-17 A

SI12BAT8-25

COMMISSIONING MAIN TRANSFORMER 12BAT

7d

15-Jul-17 A

21-Jul-17 A

323d

08-Dez-16 A

26-Okt-17

SI01BAT3-83

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 01BAT01 * (SPA289d RE TRAFO) 08-Dez-16 A

22-Sep-17

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 01BAT01 * (SPA RE TRAFO)

SI01BAT4-43

TRANSPORT MAIN TRANSFORMER NSP-SITE 01BAT01 * (SPARE TRAFO) 34d

23-Sep-17

26-Okt-17

TRANSPORT MAIN TRANSFORMER NSP-SITE 01BAT01 * (SPARE TRAFO)

468d

03-Mai-16 A

14-Aug-17

233d

03-Mai-16 A

21-Dez-16 A

224d

03-Mai-16 A

13-Dez-16 A

UNIT 01 - SPARE

PCC for GT Block 4 UNIT 42 SI42UBA4H25

TRANSPORT PCC 42UBA3110/3310 NSP - SITE

38d

03-Mai-16 A

09-Jun-16 A

OC42UBA7-15

INTERNAL INSTALLATION PCC 42UBA3110/3210/3310/3410/3510

28d

23-Jul-16 A

20-Aug-16 A

SI42UBA8G25#

ELECTRICAL COMMISSIONING FOR BACK ENERGIZING

26d

17-Nov-16 A

12-Dez-16 A

SI42B--8-50

MV AVAILABLE (BACK ENERGIZING)

0d

13-Dez-16 A

233d

03-Mai-16 A

21-Dez-16 A

UNIT 41 TRANSPORT PCC 41UBA3110/3310 NSP - SITE

38d

03-Mai-16 A

09-Jun-16 A

OC41UBA7-15

INTERNAL INSTALLATION PCC 41UBA3110/3210/3310/3410/3510

17d

03-Aug-16 A

20-Aug-16 A

SI41UBA8-25#

COMMISSIONING ELECTRICAL SYSTE MS (GT41)

35d

17-Nov-16 A

21-Dez-16 A

SI41B--8-50

MV AVAILABLE (BACK ENERGIZING)

0d

21-Dez-16 A

230d

23-Mai-16 A

07-Jan-17 A

222d

23-Mai-16 A

31-Dez-16 A

TRANSPORT PCC 32UBA3110/3310 NSP - SITE

35d

23-Mai-16 A

26-Jun-16 A

OC32UBA7-15

INTERNAL INSTALLATION PCC 32UBA3110/3210/3310/3410/3510

48d

12-Aug-16 A

28-Sep-16 A

SI32UBA8G25#

ELECTRICAL COMMISSIONING FOR BACK ENERGIZING

35d

23-Nov-16 A

27-Dez-16 A

SI32B--8-50

MV AVAILABLE (BACK ENERGIZING)

0d

31-Dez-16 A

230d

23-Mai-16 A

07-Jan-17 A

TRANSPORT PCC 31UBA3110/3310 NSP - SITE

35d

23-Mai-16 A

26-Jun-16 A

OC31UBA7-15

INTERNAL INSTALLATION PCC 31UBA3110/3210/3310/3410/3510

65d

23-Jul-16 A

25-Sep-16 A

SI31UBA8-25#

COMMISSIONING ELECTRICAL SYSTE MS (GT31)

34d

05-Dez-16 A

07-Jan-17 A

SI31B--8-50

MV AVAILABLE (BACK ENERGIZING)

0d

31-Dez-16 A

233d

25-Sep-16 A

16-Mai-17 A

TRANSPORT PCC 42UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 42UBA3110/3210/3310/3410/3510 ELECTRICAL COMMISSIONING FOR BACK ENERGIZING

TRANSPORT PCC 41UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 41UBA3110/3210/3310/3410/3510 COMMISSIONING ELECTRICAL SYSTE MS (GT41)

TRANSPORT PCC 32UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 32UBA3110/3210/3310/3410/3510 ELECTRICAL COMMISSIONING FOR BACK ENERGIZING

10-Mai-17 A

TRANSPORT PCC 31UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 31UBA3110/3210/3310/3410/3510 COMMISSIONING ELECTRICAL SYSTE MS (GT31) MV AVAILABLE (BACK ENERGIZING)

228d

25-Sep-16 A

SI22UBA4H25

TRANSPORT PCC 22UBA3110/3310 NSP - SITE

35d

25-Sep-16 A

30-Okt-16 A

OC22UBA7-15

INTERNAL INSTALLATION PCC 22UBA3110/3210/3310/3410/3510

71d

19-Dez-16 A

28-Feb-17 A

SI22UBA8G25#

ELECTRICAL COMMISSIONING FOR BACK ENERGIZING

38d

02-Apr-17 A

09-Mai-17 A

SI22B--8-50

MV AVAILABLE (BACK ENERGIZING)

0d

10-Mai-17 A

233d

25-Sep-16 A

16-Mai-17 A

UNIT 21

COMMISSIONING MAIN TRANSFORMER 12BAT

MV AVAILABLE (BACK ENERGIZING)

SI31UBA4H25

Block 2 UNIT 22

ERECTION GENERATOR TRANSFORMERS 12BAT

MV AVAILABLE (BACK ENERGIZING)

SI32UBA4H25

UNIT 31

TRANSPORT MAIN TRANSFORMER NSP-SITE 12BAT

MV AVAILABLE (BACK ENERGIZING)

SI41UBA4H25

Block 3 UNIT 32

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 12BAT *

TRANSPORT PCC 22UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 22UBA3110/3210/3310/3410/3510 ELECTRICAL COMMISSIONING FOR BACK ENERGIZING MV AVAILABLE (BACK ENERGIZING)

SI21UBA4H25

TRANSPORT PCC 21UBA3110/3310 NSP - SITE

35d

25-Sep-16 A

30-Okt-16 A

OC21UBA7-15

INTERNAL INSTALLATION PCC 21UBA3110/3210/3310/3410/3510

74d

17-Dez-16 A

01-Mrz-17 A

SI21UBA8G25#

ELECTRICAL COMMISSIONING FOR BACK ENERGIZING

44d

02-Apr-17 A

15-Mai-17 A

ELECTRICAL COMMISSIONING FOR BACK ENERGIZING

SI21UBA8-25#

COMMISSIONING ELECTRICAL SYSTE MS (GT21)

37d

09-Apr-17 A

15-Mai-17 A

COMMISSIONING ELECTRICAL SYSTE MS (GT21)

SI21B--8-50

MV AVAILABLE (BACK ENERGIZING)

0d

16-Mai-17 A

176d

19-Feb-17 A

Block 1 UNIT 11

TRANSPORT PCC 21UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 21UBA3110/3210/3310/3410/3510

MV AVAILABLE (BACK ENERGIZING) 14-Aug-17

176d

19-Feb-17 A

14-Aug-17

SI11UBA4H25

TRANSPORT PCC 11UBA3110/3310 NSP - SITE

35d

19-Feb-17 A

25-Mrz-17 A

OC11UBA7-15

INTERNAL INSTALLATION PCC 11UBA3110/3210/3310/3410/3510

51d

30-Mrz-17 A

20-Mai-17 A

SI11UBA8-25#

COMMISSIONING ELECTRICAL SYSTE MS (GT11)

39d

06-Jul-17 A

13-Aug-17

TRANSPORT PCC 11UBA3110/3310 NSP - SITE INTERNAL INSTALLATION PCC 11UBA3110/3210/3310/3410/3510 COMMISSIONING ELECTRICAL SYSTE MS (GT11)


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

SI11B--8-50

Activity Name

MV AVAILABLE (BACK ENERGIZING)

UNIT 12

Layout Name : EG1019_Level2 Dur.

0d

Start

Finish

14-Aug-17

MV AVAILABLE (BACK ENERGIZING)

165d

01-Mrz-17 A

12-Aug-17

SI12UBA4H25

TRANSPORT PCC 12UBA3110/3310 NSP - SITE

35d

01-Mrz-17 A

04-Apr-17 A

OC12UBA7-15

INTERNAL INSTALLATION PCC 12UBA3110/3210/3310/3410/3510

53d

01-Apr-17 A

24-Mai-17 A

SI12UBA8G25#

ELECTRICAL COMMISSIONING FOR BACK ENERGIZING

38d

06-Jul-17 A

12-Aug-17

SI12B--8-50

MV AVAILABLE (BACK ENERGIZING)

0d

12-Aug-17 19-Jun-16 A

08-Sep-17

424d

19-Jun-16 A

16-Aug-17

424d

19-Jun-16 A

16-Aug-17

424d

19-Jun-16 A

16-Aug-17

332d

20-Jun-16 A

18-Mai-17 A

332d

20-Jun-16 A

18-Mai-17 A

389d

16-Jul-16 A

08-Aug-17

389d

16-Jul-16 A

08-Aug-17

389d

16-Jul-16 A

08-Aug-17

248d

11-Aug-16 A

15-Apr-17 A

248d

11-Aug-16 A

15-Apr-17 A

177d

04-Jan-17 A

29-Jun-17 A

177d

04-Jan-17 A

29-Jun-17 A

177d

04-Jan-17 A

29-Jun-17 A

121d

10-Jan-17 A

10-Mai-17 A

121d

10-Jan-17 A

10-Mai-17 A

241d

11-Jan-17 A

08-Sep-17

237d

11-Jan-17 A

04-Sep-17

237d

11-Jan-17 A

04-Sep-17

241d

11-Jan-17 A

08-Sep-17

241d

11-Jan-17 A

08-Sep-17

926d

25-Aug-15 A

08-Mrz-18

589d

24-Jun-16 A

02-Feb-18

589d

24-Jun-16 A

02-Feb-18

589d

24-Jun-16 A

02-Feb-18

OC40P--6A15#

SUMMARY PIP ING, CABLING PAB / C / H / PB / PCB / PGB / PUS SYSTEM 524d

24-Jun-16 A

29-Nov-17

OC40---6A15#

SUMMARY ERECTION WATER S TEAM CYCLE (BO P POWER BLOCK)589d

24-Jun-16 A

02-Feb-18

OC40E--6A15#

SUMMARY PIP ING, INSUL., CABLING EG D/EKG/MB-AUX.SYSTEM

272d

11-Aug-16 A

10-Mai-17 A

OC40LC-6A15#

SUMMARY PIP ING, INSUL., CABLING LCA /C/W/LCL/QC/QU SYS TEM 243d

27-Mai-17 A

24-Jan-18

OC40L--6-15#

SUMMARY PIP ING, INSUL., CABLING LBA /G/S/MAN S YSTEM

190d

02-Jul-17 A

07-Jan-18

542d

20-Apr-16 A

13-Okt-17

123d

29-Mai-16 A

28-Sep-16 A

123d

29-Mai-16 A

28-Sep-16 A

123d

29-Mai-16 A

28-Sep-16 A

0d

27-Jul-16 A

140d

20-Apr-16 A

07-Sep-16 A

140d

20-Apr-16 A

07-Sep-16 A

140d

20-Apr-16 A

07-Sep-16 A

0d

15-Aug-16 A

470d

01-Jul-16 A

13-Okt-17

470d

01-Jul-16 A

13-Okt-17

Block 4 UNIT 42 OC42B--7-15#

SUMMARY ELECTRICAL ERECTION 42UMB

UNIT 41 OC41B--7-15#

SUMMARY ELECTRICAL ERECTION 41UMB

Block 3 UNIT 32 OC32B--7-15#

SUMMARY ELECTRICAL ERECTION 32UMB

UNIT 31 OC31B--7-15#

SUMMARY ELECTRICAL ERECTION 31UMB

Block 2 UNIT 22 OC22B--7-15#

SUMMARY ELECTRICAL ERECTION 22UMB

UNIT 21 OC21B--7-15#

SUMMARY ELECTRICAL ERECTION 21UMB

Block 1 UNIT 11 OC11B--7-15#

SUMMARY ELECTRICAL ERECTION 11UMB

UNIT 12 OC12B--7-15#

SUMMARY ELECTRICAL ERECTION 12UMB

STEAM TURBINE AREA Piping Erection Block 4 UNIT 40

Turboset Foundation UMA Block 4 UNIT 40 OC40UMA5A15#

SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION)

OC40UMA5A10

(H) START PLACING FORMWORK ST-SET FOUNDATION UMA

Block 3 UNIT 30 OC30UMA5A15#

SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION)

OC30UMA5A10

(H) START PLACING FORMWORK ST-SET FOUNDATION UMA

Block 2 UNIT 20

0d

01-Jul-16 A

OC20UMA5Y15

CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 20UMA 30d

01-Jul-16 A

31-Jul-16 A

OC20UMA5A15#

SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION)

94d

22-Jul-16 A

24-Okt-16 A

OC20UMA5A10

(H) START PLACING FORMWORK ST-SET FOUNDATION UMA

0d

04-Okt-16 A

OC20UMA5B15#

SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 20UMA

339d

09-Nov-16 A

13-Okt-17

135d

31-Mai-16 A

12-Okt-16 A

135d

31-Mai-16 A

12-Okt-16 A

135d

31-Mai-16 A

12-Okt-16 A

0d

25-Aug-16 A

607d

18-Feb-16 A

16-Okt-17

585d

11-Mrz-16 A

16-Okt-17

585d

11-Mrz-16 A

16-Okt-17

381d

11-Mrz-16 A

26-Mrz-17 A

SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION)

OC10UMA5A10

(H) START PLACING FORMWORK ST-SET FOUNDATION UMA

Civil Works UMA Block 4 UNIT 40

SUMMARY ELECTRICAL ERECTION 41UMB

SUMMARY ELECTRICAL ERECTION 32UMB

SUMMARY ELECTRICAL ERECTION 31UMB

SUMMARY ELECTRICAL ERECTION 22UMB

SUMMARY ELECTRICAL ERECTION 21UMB

SUMMARY ELECTRICAL ERECTION 11UMB

SUMMARY ELECTRICAL ERECTION 12UMB

SUMMARY PIP ING, CABLING PAB / C / H / PB / PCB / PGB / PUS SYSTEM SUMMARY ERECTION WATER S TEAM CYCLE (BO P POWER BLOCK) SUMMARY PIPING, INSUL., CABLING EG D/EKG/MB-AUX.SYSTEM SUMMARY PIPING, INSUL., CABLING LCA/C/W/LCL/QC/QU SYSTEM SUMMARY PIPING, INSUL., CABLING LBA /G/S/MAN SYSTEM

SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION)

SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION)

CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 20UMA SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION) (H) START PLACING FORMWORK ST-SET FOUNDATION UMA SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 20UMA

SUMMARY TURBOSET FOUNDATION UMA (INCL.EXCAVATION) (H) START PLACING FORMWORK ST-SET FOUNDATION UMA

SUMMARY BUILDING FOUNDATION 40UMA ( INCL. E XCAVATION)

OC40UMA5-10

(H) START PLACING FORMWORK BUILD.FOUNDATION 40UMA

0d

14-Apr-16 A

OC40UMA5Y10

(H) START PLACING FORMWORK COND.PIT 40UMA

0d

16-Apr-16 A

OC40UMA5Y15

CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 40UMA 47d

16-Apr-16 A

02-Jun-16 A

OC40UMA5B15#

SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 40UMA

287d

03-Jan-17 A

16-Okt-17

OC40SMM6-15

ERECTION CRANE 40SMM02FOR UMA

1d

02-Mai-17 A

03-Mai-17 A

595d

18-Feb-16 A

04-Okt-17

595d

18-Feb-16 A

04-Okt-17

469d

18-Feb-16 A

31-Mai-17 A

SUMMARY BUILDING FOUNDATION 40UMA ( INCL. EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION 40UMA (H) START PLACING FORMWORK COND.PIT 40UMA

OC30UMA5-16#

SUMMARY BUILDING FOUNDATION UMA ( INCL. EXCAVATION)

OC30UMA5-10

(H) START PLACING FORMWORK BUILD.FOUNDATION UMA

0d

10-Apr-16 A

OC30UMA5Y10

(H) START PLACING FORMWORK COND.PIT 30UMA

0d

26-Apr-16 A

OC30UMA5Y15

CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 30UMA 40d

26-Apr-16 A

05-Jun-16 A

OC30UMA5B15#

SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 30UMA

319d

20-Nov-16 A

04-Okt-17

OC30SMM6-15

ERECTION CRANE 30SMM02FOR UMA

23d

05-Apr-17 A

27-Apr-17 A

303d

09-Mai-16 A

08-Mrz-17 A

Block 2

SUMMARY ELECTRICAL ERECTION 42UMB

(H) START PLACING FORMWORK COND.PIT 20UMA

OC40UMA5-16#

Block 3 UNIT 30

ELECTRICAL COMMISSIONING FOR BACK ENERGIZING

(H) START PLACING FORMWORK ST-SET FOUNDATION UMA

(H) START PLACING FORMWORK COND.PIT 20UMA

OC10UMA5A15#

INTERNAL INSTALLATION PCC 12UBA3110/3210/3310/3410/3510

(H) START PLACING FORMWORK ST-SET FOUNDATION UMA

OC20UMA5Y10

Block 1 UNIT 10

TRANSPORT PCC 12UBA3110/3310 NSP - SITE

MV AVAILABLE (BACK ENERGIZING)

447d

Electrical Installations in UMB

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 13 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 40UMA SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 40UMA ERECTION CRANE 40SMM02FOR UMA

SUMMARY BUILDING FOUNDATION UMA ( INCL. EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION UMA (H) START PLACING FORMWORK COND.PIT 30UMA CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 30UMA SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 30UMA ERECTION CRANE 30SMM02FOR UMA


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

UNIT 20 OC20UMA5-16#

SUMMARY BUILDING FOUNDATION UMA ( INCL. EXCAVATION)

OC20UMA5-10

(H) START PLACING FORMWORK BUILD.FOUNDATION UMA

Block 1 UNIT 10

Layout Name : EG1019_Level2 Dur.

Start

Finish

303d

09-Mai-16 A

08-Mrz-17 A

303d

09-Mai-16 A

08-Mrz-17 A

0d

03-Jul-16 A

504d

31-Mai-16 A

504d

31-Mai-16 A

16-Okt-17

289d

31-Mai-16 A

16-Mrz-17 A

16-Okt-17

SUMMARY BUILDING FOUNDATION UMA ( INCL. EXCAVATION)

OC10UMA5-10

(H) START PLACING FORMWORK BUILD.FOUNDATION UMA

0d

26-Jun-16 A

OC10UMA5Y10

(H) START PLACING FORMWORK COND.PIT 10UMA

0d

20-Jul-16 A

OC10UMA5Y15

CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 10UMA 19d

20-Jul-16 A

08-Aug-16 A

OC10UMA5B15#

SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 10UMA

346d

05-Nov-16 A

16-Okt-17

OC10SMM6-15

ERECTION CRANE 10SMM02FOR UMA

20d

04-Feb-17 A

23-Feb-17 A

926d

25-Aug-15 A

08-Mrz-18

772d

26-Jan-16 A

08-Mrz-18

772d

26-Jan-16 A

08-Mrz-18

Block 4 UNIT 40

(H) START PLACING FORMWORK COND.PIT 10UMA

DETAIL DESIGN / MANUFA CTURING / ASSEMBLY HI-L- STEAM TURBINE 469d & ST-AUXILIARIES 26-Jan-16 A 40MA 09-Mai-17 A

SI40MA-4C41

TRANSPORT ST LP OUTER CASING INDONESIA-SITE

OC40MA-6A15#

SUMMARY ERECTION ST

OC40MA-6-15# OC40MA-6-07

PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA

1d

06-Mai-17 A

06-Mai-17 A

SI40MA-4-25

TRANSPORT LP/HP-ST 40MA NSP - SITE

29d

16-Mai-17 A

14-Jun-17 A

OC40MA-6B47

PLACING LP1-TURBINE PEDESTALS MA

OC40MA-6B15#

SUMMARY ERECTION LP STEAM TURBINE MA

OC40MA-6C15#

SUMMARY ERECTION K-TURBINE MA

SI40MA-6C10

PLACING K-TURBINE MA

IO40MA-6B49

#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA 0d

SI40MA-6B16

PLACING LP1-TURBINE SHAFT IN BEARINGS MA

2d

IS40MA-6B51

#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA

0d

OC40MA-6D35#

SUMMARY FINA L ASSEMBLING STEAM TURBINE MA-

23d

19-Okt-17

10-Nov-17

OC40MAV6-71

LUBE OIL FLUSHING (INCL. PRESSURE TEST)

21d

11-Nov-17

01-Dez-17

SI40MA-8-25#

COLD COMMISSIONING ST

89d

09-Dez-17

07-Mrz-18

SI40MA-9-05

1ST. TURNING GEAR ST 40

0d

08-Mrz-18

61d

10-Feb-17 A

248d

05-Apr-17 A

08-Dez-17

SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA 59d

05-Apr-17 A

03-Jun-17 A

Block 3 UNIT 30

11-Apr-17 A

3d

28-Mai-17 A

31-Mai-17 A

136d

01-Jun-17 A

14-Okt-17

71d

17-Jun-17 A

26-Aug-17

0d

20-Jul-17 A

DETAIL DESIGN / MANUFA CTURING / ASSEMBLY HI-L- STEAM TURBINE & ST-AUXILIARIES 40MA TRANSPORT ST LP OUTER CASING INDONESIA-SITE SUMMARY ERECTION ST SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA TRANSPORT LP/HP-ST 40MA NSP - SITE PLACING LP1-TURBINE PEDESTALS MA SUMMARY ERECTION LP STEAM TURBINE MA SUMMARY ERECTION K-TURBINE MA PLACING K-TURBINE MA

02-Sep-17

PLACING LP1-TURBINE SHAFT IN BEARINGS MA

02-Sep-17

#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA SUMMARY FINA L ASSEMBLING STEAM TURBINE MALUBE OIL FLUSHING (INCL. PRESSURE TEST) COLD COMMISSIONING ST 1ST. TURNING GEAR ST 40

22-Feb-18

806d

09-Dez-15 A

22-Feb-18

SP30MA-3-25

DETAIL DESIGN / MANUFA CTURING / ASSEMBLY HI-L- STEAM TURBINE 489d & ST-AUXILIARIES 09-Dez-15 A 30MA 10-Apr-17 A

SI30MA-4C41

TRANSPORT ST LP OUTER CASING INDONESIA-SITE

58d

31-Dez-16 A

26-Feb-17 A

OC30MA-6-07

PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA

17d

01-Apr-17 A

18-Apr-17 A

OC30MA-6B47

PLACING LP1-TURBINE PEDESTALS MA

8d

15-Apr-17 A

23-Apr-17 A

SI30MA-4-25

TRANSPORT LP/HP-ST 30MA NSP - SITE

36d

18-Apr-17 A

23-Mai-17 A

OC30MA-6B15#

SUMMARY ERECTION LP STEAM TURBINE MA

179d

06-Mai-17 A

31-Okt-17

OC30MA-6C15#

SUMMARY ERECTION K-TURBINE MA

101d

06-Mai-17 A

14-Aug-17

OC30MA-6A15#

SUMMARY ERECTION ST

232d

08-Mai-17 A

25-Dez-17

OC30MA-6-15#

SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA 19d

08-Mai-17 A

26-Mai-17 A

SI30MA-6C10

PLACING K-TURBINE MA

14-Mai-17 A

IO30MA-6B49

#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA 0d

SI30MA-6B16

PLACING LP1-TURBINE SHAFT IN BEARINGS MA

2d

IS30MA-6B51

#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA

0d

OC30MA-6D35#

SUMMARY FINA L ASSEMBLING STEAM TURBINE MA-

23d

05-Nov-17

27-Nov-17

OC30MAV6-71

LUBE OIL FLUSHING (INCL. PRESSURE TEST)

21d

28-Nov-17

18-Dez-17

SI30MA-8-25#

COLD COMMISSIONING ST

58d

26-Dez-17

21-Feb-18

SI30MA-9-05

1ST. TURNING GEAR ST 30

0d

22-Feb-18

Block 2 UNIT 20

SUMMARY STEELWORK, PLATFORMS, CLADDING / ETC. 10UMA ERECTION CRANE 10SMM02FOR UMA

#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARIN GS MA

09-Dez-15 A

18-Sep-17

CONSTRUCTION CONCRETE STRUCTURE CONDENSATE PIT 10UMA

01-Sep-17

806d

0d

SUMMARY BUILDING FOUNDATION UMA ( IN CL. EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION UMA

SP40MA-3-25

01-Sep-17

SUMMARY BUILDING FOUNDATION UMA ( IN CL. EXCAVATION) (H) START PLACING FORMWORK BUILD.FOUNDATION UMA

OC10UMA5-16#

Steam Turbine

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 14 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

DETAIL DESIGN / MANUFA CTURING / ASSEMBLY HI-L- STEAM TURBINE & ST-AUXILIARIES 30MA TRANSPORT ST LP OUTER CASING INDONESIA-SITE PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA PLACING LP1-TURBINE PEDESTALS MA TRANSPORT LP/HP-ST 30MA NSP - SITE SUMMARY ERECTION LP STEAM TURBINE MA SUMMARY ERECTION K-TURBINE MA SUMMARY ERECTION ST SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA PLACING K-TURBINE MA

17-Sep-17

#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA

19-Sep-17

PLACING LP1-TURBINE SHAFT IN BEARINGS MA

19-Sep-17

#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA SUMMARY FINA L ASSEMBLING STEAM TURBINE MALUBE OIL FLUSHING (INCL. PRESSURE TEST) COLD COMMISSIONING ST 1ST. TURNING GEAR ST 30

851d

03-Okt-15 A

31-Jan-18

851d

03-Okt-15 A

31-Jan-18

SP20MA-3-25

DETAIL DESIGN / MANUFA CTURING / ASSEMBLY HI-L- STEAM TURBINE 487d & ST-AUXILIARIES 03-Okt-15 A 20MA 31-Jan-17 A

DETAIL DESIGN / MANUFACTURING / ASSEMBLY HI-L- STEAM TURBINE & ST-AUXILIARIES 20MA

SI20MA-4C41

TRANSPORT ST LP OUTER CASING INDONESIA-SITE

86d

12-Nov-16 A

06-Feb-17 A

TRANSPORT ST LP OUTER CASING INDONESIA-SITE

SI20MA-4-25

TRANSPORT LP/HP-ST 20MA NSP - SITE

36d

08-Feb-17 A

15-Mrz-17 A

TRANSPORT LP/HP-ST 20MA NSP - SITE

OC20MA-6A15#

SUMMARY ERECTION ST

258d

15-Mrz-17 A

27-Nov-17

OC20MA-6-15#

SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA 73d

15-Mrz-17 A

26-Mai-17 A

OC20MA-6-07

PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA

19d

27-Mrz-17 A

15-Apr-17 A

PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA

OC20MA-6B47

PLACING LP1-TURBINE PEDESTALS MA

1d

28-Mrz-17 A

29-Mrz-17 A

PLACING LP1-TURBINE PEDESTALS MA

OC20MA-6C15#

SUMMARY ERECTION K-TURBINE MA

99d

29-Apr-17 A

05-Aug-17

OC20MA-6B15#

SUMMARY ERECTION LP STEAM TURBINE MA

152d

05-Mai-17 A

03-Okt-17

SI20MA-6C10

PLACING K-TURBINE MA

0d

06-Mai-17 A

IO20MA-6B49

#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA 0d

SI20MA-6B16

PLACING LP1-TURBINE SHAFT IN BEARINGS MA

2d

IS20MA-6B51

#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA

0d

OC20MA-6D35#

SUMMARY FINA L ASSEMBLING STEAM TURBINE MA-

23d

08-Okt-17

30-Okt-17

OC20MAV6-71

LUBE OIL FLUSHING (INCL. PRESSURE TEST)

21d

31-Okt-17

20-Nov-17

SI20MA-8-25#

COLD COMMISSIONING ST

64d

28-Nov-17

30-Jan-18

SI20MA-9-05

1ST. TURNING GEAR ST 20

0d

31-Jan-18

Block 1 UNIT 10 SP10MA-3-25

13-Aug-17

SUMMARY ERECTION ST SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA

SUMMARY ERECTION K-TURBINE MA SUMMARY ERECTION LP STEAM TURBINE MA PLACING K-TURBINE MA

12-Aug-17

#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA

14-Aug-17

PLACING LP1-TURBINE SHAFT IN BEARINGS MA

14-Aug-17

#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA SUMMARY FINA L ASSEMBLING STEAM TURBINE MALUBE OIL FLUSHING (INCL. PRESSURE TEST) COLD COMMISSIONING ST 1ST. TURNING GEAR ST 20

886d

25-Aug-15 A

27-Jan-18

886d

25-Aug-15 A

27-Jan-18

DETAIL DESIGN / MANUFA CTURING / ASSEMBLY HI-L- STEAM TURBINE 487d & ST-AUXILIARIES 25-Aug-15 A 10MA 23-Dez-16 A

DETAIL DESIGN / MANUFACTURING / ASSEMBLY HI-L- STEAM TURBINE & ST-AUXILIARIES 10MA


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

Layout Name : EG1019_Level2 Dur.

Start

Finish

SI10MA-4C41

TRANSPORT ST LP OUTER CASING INDONESIA-SITE

37d

06-Nov-16 A

13-Dez-16 A

SI10MA-4-25

TRANSPORT LP/HP-ST MA NSP - SITE

25d

31-Dez-16 A

25-Jan-17 A

OC10MA-6-15#

SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA 58d

14-Mrz-17 A

10-Mai-17 A

OC10MA-6A15#

SUMMARY ERECTION ST

259d

14-Mrz-17 A

27-Nov-17

OC10MA-6-07

PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA

11d

25-Mrz-17 A

05-Apr-17 A

OC10MA-6C15#

SUMMARY ERECTION K-TURBINE MA

21d

26-Apr-17 A

16-Mai-17 A

SI10MA-6C10

PLACING K-TURBINE MA

0d

02-Mai-17 A

OC10MA-6B15#

SUMMARY ERECTION LP STEAM TURBINE MA

144d

13-Mai-17 A

03-Okt-17

OC10MA-6B47

PLACING LP1-TURBINE PEDESTALS MA

10d

14-Mai-17 A

23-Mai-17 A

IO10MA-6B49

#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA 0d

SI10MA-6B16

PLACING LP1-TURBINE SHAFT IN BEARINGS MA

2d

IS10MA-6B51

#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA

0d

OC10MA-6D35#

SUMMARY FINA L ASSEMBLING STEAM TURBINE MA-

23d

08-Okt-17

30-Okt-17

OC10MAV6-71

LUBE OIL FLUSHING (INCL. PRESSURE TEST)

21d

31-Okt-17

20-Nov-17

SI10MA-8-25#

COLD COMMISSIONING ST

60d

28-Nov-17

26-Jan-18

SI10MA-9-05

1ST. TURNING GEAR ST 10

0d

27-Jan-18

ST Generator MKA Block 4 UNIT 40

13-Aug-17

22-Dez-17

371d

28-Mrz-16 A

02-Apr-17 A

28d

10-Apr-17 A

08-Mai-17 A

OC40MKA6-80#

SUMMARY FINA L ASSEMBLING AND TESTING GENERATOR

0d

04-Dez-17

22-Dez-17

12-Feb-16 A

08-Jan-18

697d

12-Feb-16 A

08-Jan-18

389d

12-Feb-16 A

06-Mrz-17 A

36d

14-Mrz-17 A

18-Apr-17 A

SI30MKA4-21

TRANSPORT ST GENERATO R 30MKA NSP - SITE

OC30MKA6-15#

SUMMARY ERECTION GENERATOR 30MKA (INCL. PREPARATION FOUNDATION) 181d 01-Mai-17 A

OC30MKA6-20

GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING

OC30MKA6-80#

SUMMARY FINA L ASSEMBLING AND TESTING GENERATOR

21-Dez-17

08-Jan-18

21-Dez-15 A

11-Dez-17

722d

21-Dez-15 A

11-Dez-17

316d

21-Dez-15 A

31-Okt-16 A

75d

08-Nov-16 A

22-Jan-17 A

SI20MKA4-21

TRANSPORT ST GENERATO R 20MKA NSP - SITE

OC20MKA6-15#

SUMMARY ERECTION GENERATOR 20MKA (INCL. PREPARATION FOUNDATION) 209d 01-Apr-17 A

OC20SMM6-15

ERECTION CRANE 20SMM02FOR UMA

OC20MKA6-20 OC20MKA6-80#

14-Apr-17 A

GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING

0d

13-Aug-17

SUMMARY FINA L ASSEMBLING AND TESTING GENERATOR

19d

23-Nov-17

11-Dez-17

764d

09-Nov-15 A

11-Dez-17

764d

09-Nov-15 A

11-Dez-17

307d

09-Nov-15 A

10-Sep-16 A

21d

12-Okt-16 A

02-Nov-16 A

SP10MKA3-25

MANUFACTURING ST GENERATO R 10MKA

SI10MKA4-21

TRANSPORT ST GENERATO R 10MKA NSP - SITE

OC10MKA6-15#

SUMMARY ERECTION GENERATOR 10MKA (INCL. PREPARATION FOUNDATION) 184d 01-Apr-17 A

OC10MKA6-20

GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING

OC10MKA6-80#

SUMMARY FINA L ASSEMBLING AND TESTING GENERATOR

DESIGN / MANUFA CTURING S T CONDENSER 40MAG

SI40MAG4-25

TRANSPORT CONDENSER 40MAG BANTEN-SITE

OC40MAG6-20#

SUMMARY ERECTION CONDENSER 40MA G10

Block 3 UNIT 30 SP30MAG3-25

DESIGN / MANUFA CTURING S T CONDENSER 30MAG

SI30MAG4-25

TRANSPORT CONDENSER 30MAG BANTEN-SITE

OC30MAG6-20#

SUMMARY ERECTION CONDENSER 30MA G10

Block 2 UNIT 20 SP20MAG3-25

DESIGN / MANUFA CTURING S T CONDENSER 20MAG

SI20MAG4-25

TRANSPORT CONDENSER 20MAG BANTEN-SITE

OC20MAG6-20#

SUMMARY ERECTION CONDENSER 20MA G10

Block 1 UNIT 10 SP10MAG3-25

DESIGN / MANUFA CTURING S T CONDENSER 10MAG

SI10MAG4-25

TRANSPORT CONDENSER 10MAG BANTEN-SITE

OC10MAG6-20#

SUMMARY ERECTION CONDENSER 10MA G10

Lube Oil / Lifting Oil System MAV Block 4 UNIT 40 OC40MAV6-55

Block 3 UNIT 30

LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST

MANUFACTURING ST GENERATO R 30MKA TRANSPORT ST GENERATO R 30MKA NSP - SITE SUMMARY ERECTION GENERATOR 30MKA (INCL. PREPARATION FOUNDATION)

SUMMARY FINAL ASSEMBLING AND TESTING GENERATOR

MANUFACTURING ST GENERATO R 20MKA TRANSPORT ST GENERATO R 20MKA NSP - SITE

26-Okt-17

6d

SP40MAG3-25

SUMMARY FINA L ASSEMBLING AND TESTING GENERATOR

GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING

19d

MANUFACTURING ST GENERATO R 20MKA

Block 4 UNIT 40

SUMMARY ERECTION GENERATOR 40MKA (INCL. PREPARATION FOUNDATION)

27-Aug-17

SP20MKA3-25

Condensing System Water Cooled for CT or OC MAG

TRANSPORT ST GENERATO R 40MKA NSP - SITE

28-Okt-17

722d

0d

MANUFACTURING ST GENERATO R 40MKA

GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING

19d

MANUFACTURING ST GENERATO R 30MKA

Block 1 UNIT 10

COLD COMMISSIONING ST

22-Aug-17*

SP30MKA3-25

Block 2 UNIT 20

LUBE OIL FLUSHING (INCL. PRESSURE TEST)

22-Dez-17

697d

0d

SUMMARY FINA L ASSEMBLING STEAM TURBINE MA-

1ST. TURNING GEAR ST 10

22-Dez-17

GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING

Block 3 UNIT 30

#Interface# PLACING LP1-TURBINE SHAFT IN BEARINGS MA

28-Mrz-16 A

OC40MKA6-20

SUMMARY ERECTION LP STEAM TURBINE MA PLACING LP1-TURBINE PEDESTALS MA

PLACING LP1-TURBINE SHAFT IN BEARINGS MA

28-Mrz-16 A

SUMMARY ERECTION GENERATOR 40MKA (INCL. PREPARATION FOUNDATION) 224d 13-Mai-17 A

SUMMARY ERECTION K-TURBINE MA

14-Aug-17

635d

OC40MKA6-15#

SUMMARY ERECTION ST PLACING BEARING CASINGS INCL. ANCHOR BOLTS MA

#Interface# READY FOR PLACING LP1-TURBINE SHAFT IN BEARINGS MA

635d

TRANSPORT ST GENERATO R 40MKA NSP - SITE

SUMMARY ERECTION STEAM TURBINE PEDESTALS/BEARINGS MA

14-Aug-17

08-Jan-18

SI40MKA4-21

TRANSPORT LP/HP-ST MA NSP - SITE

12-Aug-17

09-Nov-15 A

MANUFACTURING ST GENERATO R 40MKA

TRANSPORT ST LP OUTER CASING INDONESIA-SITE

PLACING K-TURBINE MA

792d

SP40MKA3-25

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 15 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

SUMMARY ERECTION GENERATOR 20MKA (INCL. PREPARATION FOUNDATION)

20-Apr-17 A

ERECTION CRANE 20SMM02FOR UMA GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING SUMMARY FINA L ASSEMBLING AND TESTING GENERATOR

MANUFACTURING ST GENERATO R 10MKA TRANSPORT ST GENERATO R 10MKA NSP - SITE

01-Okt-17

SUMMARY ERECTION GENERATOR 10MKA (INCL. PREPARATION FOUNDATION)

06-Aug-17*

GENERATOR READY FOR PRE-ASSEMBLING MKW-PIPING

19d

23-Nov-17

11-Dez-17

759d

18-Okt-15 A

14-Nov-17

627d

12-Feb-16 A

30-Okt-17

627d

12-Feb-16 A

30-Okt-17

332d

12-Feb-16 A

08-Jan-17 A

34d

19-Jan-17 A

21-Feb-17 A

231d

14-Mrz-17 A

30-Okt-17

654d

19-Jan-16 A

02-Nov-17

654d

19-Jan-16 A

02-Nov-17

332d

19-Jan-16 A

15-Dez-16 A

26d

30-Dez-16 A

25-Jan-17 A

235d

13-Mrz-17 A

02-Nov-17

717d

29-Nov-15 A

14-Nov-17

717d

29-Nov-15 A

14-Nov-17

313d

29-Nov-15 A

07-Okt-16 A

53d

06-Nov-16 A

28-Dez-16 A

284d

04-Feb-17 A

14-Nov-17

733d

18-Okt-15 A

19-Okt-17

733d

18-Okt-15 A

19-Okt-17

332d

18-Okt-15 A

13-Sep-16 A

31d

05-Nov-16 A

05-Dez-16 A

312d

12-Dez-16 A

19-Okt-17

60d

12-Sep-17

10-Nov-17

14d

26-Okt-17

08-Nov-17

14d

26-Okt-17

08-Nov-17

14d

26-Okt-17

08-Nov-17

14d

28-Okt-17

10-Nov-17

14d

28-Okt-17

10-Nov-17

SUMMARY FINAL ASSEMBLING AND TESTING GENERATOR

DESIGN / MANUFA CTURING S T CONDENSER 40MAG TRANSPORT CONDENSER 40MAG BANTEN-SITE SUMMARY ERECTION CONDENSER 40MA G10

DESIGN / MANUFACTURING ST CONDENSER 30MAG TRANSPORT CONDENSER 30MAG BANTEN-SITE SUMMARY ERECTION CONDENSER 30MAG10

DESIGN / MANUFACTURING ST CONDENSER 20MAG TRANSPORT CONDENSER 20MAG BANTEN-SITE SUMMARY ERECTION CONDENSER 20MAG10

DESIGN / MANUFA CTURING S T CONDENSER 10MAG TRANSPORT CONDENSER 10MAG BANTEN-SITE SUMMARY ERECTION CONDENSER 10MAG10

LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

OC30MAV6-55

Activity Name

LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST

Block 2 UNIT 20 OC20MAV6-55

LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST

Block 1 UNIT 10 OC10MAV6-55

LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST

Piling UMA Area Block 4 UNIT 40

Layout Name : EG1019_Level2 Dur.

Start

Finish

14d

28-Okt-17

10-Nov-17

14d

12-Sep-17

25-Sep-17

14d

12-Sep-17

25-Sep-17

14d

12-Sep-17

25-Sep-17

14d

12-Sep-17

25-Sep-17

14d

12-Sep-17

25-Sep-17

14d

12-Sep-17

25-Sep-17

434d

05-Jan-16 A

14-Mrz-17 A

189d

17-Jan-16 A

24-Jul-16 A

189d

17-Jan-16 A

24-Jul-16 A

OC40UMA5A00

PILING TS FOUNDATION 40UMA + TESTING

47d

17-Jan-16 A

04-Mrz-16 A

OC40UMA5-00

PILING BUILDING FOUNDATION 40UMA + TESTING

40d

24-Jan-16 A

04-Mrz-16 A

OC40UAH5-00

PILING 40UAH + TESTING (Stone Columns)

13d

21-Apr-16 A

04-Mai-16 A

OC40UBF5-00

PILING 40UBF A ND 40UBD02 + TESTING

8d

16-Jul-16 A

24-Jul-16 A

329d

05-Jan-16 A

28-Nov-16 A

Block 3 UNIT 30

329d

05-Jan-16 A

28-Nov-16 A

OC30UMA5-00

PILING BUILDING FOUNDATION 30UMA + TESTING

40d

05-Jan-16 A

14-Feb-16 A

OC30UMA5A00

PILING TS FOUNDATION 30UMA + TESTING

24d

17-Feb-16 A

12-Mrz-16 A

OC30UAH5-00

PILING 30UAH + TESTING (Stone Columns)

OC30UBF5-00

PILING 30UBF A ND 30UBD02 + TESTING

Block 2 UNIT 20

1d

13-Mai-16 A

14-Mai-16 A

108d

13-Aug-16 A

28-Nov-16 A

265d

23-Feb-16 A

14-Nov-16 A

265d

23-Feb-16 A

14-Nov-16 A

OC20UMA5A00

PILING TS FOUNDATION 20UMA + TESTING

21d

23-Feb-16 A

15-Mrz-16 A

OC20UMA5-00

PILING BUILDING FOUNDATION 20UMA + TESTING

60d

23-Feb-16 A

23-Apr-16 A

OC20UAH5-00

PILING 20UAH + TESTING (Stone Coulmns)

2d

23-Mai-16 A

25-Mai-16 A

OC20UBF5-00

PILING 20UBF A ND 20UBD02 + TESTING

Block 1 UNIT 10

31d

14-Okt-16 A

14-Nov-16 A

364d

15-Mrz-16 A

14-Mrz-17 A

364d

15-Mrz-16 A

14-Mrz-17 A

OC10UMA5A00

PILING TS FOUNDATION 10UMA + TESTING

17d

15-Mrz-16 A

01-Apr-16 A

OC10UMA5-00

PILING BUILDING FOUNDATION 10UMA + TESTING

50d

01-Apr-16 A

21-Mai-16 A

OC10UAH5-00

PILING 10UAH + TESTING (Stone Columns)

2d

27-Mai-16 A

29-Mai-16 A

OC10UBF5-00

PILING 10UBF A ND 10UBD02 + TESTING

146d

19-Okt-16 A

14-Mrz-17 A

543d

14-Mrz-16 A

07-Sep-17

403d

01-Aug-16 A

07-Sep-17

403d

01-Aug-16 A

07-Sep-17

336d

01-Aug-16 A

02-Jul-17 A

Transformer for ST BAT Block 4 UNIT 40 SI40BAT3-25

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 40BAT *

OC40UBF5-15

CONSTRUCTION FOUNDATION 40UBF

13d

27-Apr-17 A

10-Mai-17 A

OC40UBF5E15

WALLS & PADS 40UBF

15d

13-Mai-17 A

27-Mai-17 A

SI40BAT4-25

TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 40BAT * 11d

03-Jul-17 A

13-Jul-17 A

OC40BAT7-15

ERECTION GENERATOR TRANSFORMER 40BAT01

Block 3 UNIT 30

35d

04-Aug-17*

07-Sep-17

397d

17-Jun-16 A

19-Jul-17 A

397d

17-Jun-16 A

19-Jul-17 A

290d

17-Jun-16 A

03-Apr-17 A

SI30BAT3-25

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 30BAT *

OC30UBF5-15

CONSTRUCTION FOUNDATION 30UBF

11d

12-Feb-17 A

23-Feb-17 A

OC30UBF5E15

WALLS & PADS 30UBF

20d

24-Feb-17 A

15-Mrz-17 A

SI30BAT4-25

TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 30BAT * 22d

04-Apr-17 A

25-Apr-17 A

OC30BAT7-15

ERECTION GENERATOR TRANSFORMER 30BAT01

Block 2 UNIT 20

35d

14-Jun-17 A

19-Jul-17 A

450d

23-Apr-16 A

17-Jul-17 A

450d

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 16 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST

LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST

LUBE OIL FLUSHING (INCL. PRESSURE TESTS) ST

PILING TS FOUNDATION 40UMA + TESTING PILING BUILDING FOUNDATION 40UMA + TESTING PILING 40UAH + TESTING (Stone Columns) PILING 40UBF A ND 40UBD02 + TESTING

PILING BUILDING FOUNDATION 30UMA + TESTING PILING TS FOUNDATION 30UMA + TESTING PILING 30UAH + TESTING (Stone Columns) PILING 30UBF A ND 30UBD02 + TESTING

PILING TS FOUNDATION 20UMA + TESTING PILING BUILDING FOUNDATION 20UMA + TESTING PILING 20UAH + TESTING (Stone Coulmns) PILING 20UBF AND 20UBD02 + TESTING

PILING TS FOUNDATION 10UMA + TESTING PILING BUILDING FOUNDATION 10UMA + TESTING PILING 10UAH + TESTING (Stone Columns) PILING 10UBF AND 10UBD02 + TESTING

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 40BAT * CONSTRUCTION FOUNDATION 40UBF WALLS & PADS 40UBF TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 40BAT * ERECTION GENERATOR TRANSFORMER 40BAT01

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 30BAT * CONSTRUCTION FOUNDATION 30UBF WALLS & PADS 30UBF TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 30BAT * ERECTION GENERATOR TRANSFORMER 30BAT01

23-Apr-16 A

17-Jul-17 A

SI20BAT3-25

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 20BAT *

316d

23-Apr-16 A

04-Mrz-17 A

SI20BAT4-25

TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 20BAT * 26d

05-Mrz-17 A

30-Mrz-17 A

OC20UBF5-15

CONSTRUCTION FOUNDATION 20UBF

3d

29-Mrz-17 A

01-Apr-17 A

CONSTRUCTION FOUNDATION 20UBF

OC20UBF5E15

WALLS & PADS 20UBF

19d

04-Apr-17 A

23-Apr-17 A

WALLS & PADS 20UBF

OC20BAT7-15

ERECTION GENERATOR TRANSFORMER 20BAT01

40d

07-Jun-17 A

17-Jul-17 A

479d

14-Mrz-16 A

05-Jul-17 A

479d

Block 1 UNIT 10

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 20BAT * TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 20BAT *

ERECTION GENERATOR TRANSFORMER 20BAT01

14-Mrz-16 A

05-Jul-17 A

SI10BAT3-25

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 10BAT *

288d

14-Mrz-16 A

26-Dez-16 A

SI10BAT4-25

TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 10BAT * 39d

27-Dez-16 A

04-Feb-17 A

OC10UBF5-15

CONSTRUCTION FOUNDATION 10UBF

10d

17-Mrz-17 A

26-Mrz-17 A

CONSTRUCTION FOUNDATION 10UBF

OC10UBF5E15

WALLS & PADS 10UBF

7d

29-Mrz-17 A

05-Apr-17 A

WALLS & PADS 10UBF

OC10BAT7-15

ERECTION GENERATOR TRANSFORMER 10BAT01

48d

19-Mai-17 A

05-Jul-17 A

448d

08-Nov-16 A

29-Jan-18

442d

08-Nov-16 A

23-Jan-18

442d

08-Nov-16 A

23-Jan-18

4d

08-Nov-16 A

12-Nov-16 A

27d

23-Jun-17 A

19-Jul-17 A

PCC for ST Block 4 UNIT 40 OC40UBA5-15

FOUNDATION 40UBA/UBD (INCL. UBZ OPENING)

SI40UBA4H25

TRANSPORT PCC 40UBA 4210/4310/4410/4510/4610 NSP - SITE

SI40UBA8G25

ELECTRICAL COMMISSIONING UBA4110

SI40UBA8-25#

COMMISSIONING ELECTRICAL SYSTE MS (ST)

Block 3 UNIT 30

14d

13-Sep-17

26-Sep-17

116d

30-Sep-17

23-Jan-18

434d

22-Nov-16 A

29-Jan-18

434d

22-Nov-16 A

29-Jan-18

OC30UBA5-15

FOUNDATION 30UBA/UBD (INCL. UBZ OPENING)

16d

22-Nov-16 A

07-Dez-16 A

SI30UBA4H25

TRANSPORT PCC 30UBA 4210/4310/4410/4510/4610 NSP - SITE

25d

24-Mai-17 A

17-Jun-17 A

SI30UBA8G25

ELECTRICAL COMMISSIONING UBA4110

14d

31-Aug-17

13-Sep-17

SI30UBA8-25#

COMMISSIONING ELECTRICAL SYSTE MS (ST)

120d

02-Okt-17

29-Jan-18

MANUFACTURING, SHOP TEST MAIN TRANSFORMER 10BAT * TRANSPORT MAIN TRANSFORMER CROATIA HARBOR-SITE 10BAT *

ERECTION GENERATOR TRANSFORMER 10BAT01

FOUNDATION 40UBA/UBD (INCL. UBZ OPENING) TRANSPORT PCC 40UBA 4210/4310/4410/4510/4610 NSP - SITE ELECTRICAL COMMISSIONING UBA4110 COMMISSIONING ELECTRICAL SYSTE MS (ST)

FOUNDATION 30UBA/UBD (INCL. UBZ OPENING) TRANSPORT PCC 30UBA 4210/4310/4410/4510/4610 NSP - SITE ELECTRICAL COMMISSIONING UBA4110 COMMISSIONING ELECTRICAL SYSTE MS (ST)


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

Block 2 UNIT 20

Layout Name : EG1019_Level2 Dur.

Start

Finish

367d

11-Jan-17 A

12-Jan-18

367d

11-Jan-17 A

12-Jan-18

OC20UBA5-15

FOUNDATION 20UBA/UBD (INCL. UBZ OPENING)

13d

11-Jan-17 A

24-Jan-17 A

SI20UBA4H25

TRANSPORT PCC 20UBA 4210/4310/4410/4510/4610 NSP - SITE

24d

15-Mrz-17 A

07-Apr-17 A

SI20UBA8G25

ELECTRICAL COMMISSIONING 20UBA4110

SI20UBA8-25#

COMMISSIONING ELECTRICAL SYSTE MS (ST)

Block 1 UNIT 10

14d

12-Aug-17

25-Aug-17

135d

31-Aug-17

12-Jan-18

356d

11-Jan-17 A

01-Jan-18

356d

11-Jan-17 A

01-Jan-18

OC10UBA5-15

FOUNDATION 10UBA/UBD (INCL. UBZ OPENING)

21d

11-Jan-17 A

31-Jan-17 A

SI10UBA4H25

TRANSPORT PCC 10UBA 4210/4310/4410/4510/4610 NSP - SITE

22d

11-Feb-17 A

04-Mrz-17 A

SI10UBA8-25#

COMMISSIONING ELECTRICAL SYSTE MS (ST)

166d

20-Jul-17 A

01-Jan-18

SI10UBA8G25

ELECTRICAL COMMISSIONING 10UBA4110

14d

05-Aug-17

18-Aug-17

237d

29-Mrz-17 A

20-Nov-17

120d

12-Jul-17 A

08-Nov-17

120d

12-Jul-17 A

08-Nov-17

120d

12-Jul-17 A

08-Nov-17

150d

24-Jun-17 A

20-Nov-17

150d

24-Jun-17 A

20-Nov-17

150d

24-Jun-17 A

20-Nov-17

168d

22-Mai-17 A

05-Nov-17

168d

22-Mai-17 A

05-Nov-17

168d

22-Mai-17 A

05-Nov-17

196d

29-Mrz-17 A

10-Okt-17

196d

29-Mrz-17 A

10-Okt-17

196d

29-Mrz-17 A

10-Okt-17

574d

05-Mrz-16 A

29-Sep-17

456d

01-Jul-16 A

29-Sep-17

456d

01-Jul-16 A

29-Sep-17

Electrical Installations in UMA Block 4 UNIT 40 OC40B--7-15#

SUMMARY ELECTRICAL ERECTION 40UMA

Block 3 UNIT 30 OC30B--7-15#

SUMMARY ELECTRICAL ERECTION 30UMA

Block 2 UNIT 20 OC20B--7-15#

SUMMARY ELECTRICAL ERECTION 20UMA

Block 1 UNIT 10 OC10B--7-15#

SUMMARY ELECTRICAL ERECTION 10UMA

Condensate Extraction Pump LCB Block 4 UNIT 40 SI40LCB3B25

DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION 308d 01-Jul-16 PUMP 40LCB A (w/o 04-Mai-17 MPA ) A

SI40LCB4B25

TRANSPORT CONDENSATE EXTRACTION PUMP 40LCB INDIA-SITE

28d

05-Mai-17 A

01-Jun-17 A

OC40LCB6B15

ERECTION CONDENSATE EXTRACTION PUMP 40LCB

28d

02-Sep-17

29-Sep-17

402d

17-Jun-16 A

24-Jul-17 A

402d

17-Jun-16 A

24-Jul-17 A

Block 3 UNIT 30 SI30LCB3B25

DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION 316d 17-Jun-16 PUMP 30LCB A (w/o 28-Apr-17 MPA ) A

SI30LCB4B25

TRANSPORT CONDENSATE EXTRACTION PUMP 30LCB INDIA-SITE

OC30LCB6B15

ERECTION CONDENSATE EXTRACTION PUMP 30LCB

Block 2 UNIT 20

34d

29-Apr-17 A

01-Jun-17 A

6d

18-Jul-17 A

24-Jul-17 A

449d

01-Mai-16 A

24-Jul-17 A

449d

01-Mai-16 A

24-Jul-17 A

SI20LCB3B25

DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION 302d 01-Mai-16 PUMP 20LCB A (w/o 27-Feb-17 MPA ) A

SI20LCB4B25

TRANSPORT CONDENSATE EXTRACTION PUMP 20LCB KOREA-SITE 58d

28-Feb-17 A

26-Apr-17 A

OC20LCB6B15

ERECTION CONDENSATE EXTRACTION PUMP 20LCB

58d

27-Mai-17 A

24-Jul-17 A

476d

05-Mrz-16 A

24-Jun-17 A

476d

05-Mrz-16 A

24-Jun-17 A

Block 1 UNIT 10 SI10LCB3B25

DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION 320d 05-Mrz-16 PUMP 10LCB A (w/o 18-Jan-17 MPA ) A

SI10LCB4B25

TRANSPORT CONDENSATE EXTRACTION PUMP 10LCB KOREA-SITE 24d

19-Jan-17 A

11-Feb-17 A

OC10LCB6B15

ERECTION CONDENSATE EXTRACTION PUMP 10LCB

52d

03-Mai-17 A

24-Jun-17 A

856d

08-Dez-15 A

11-Apr-18

309d

08-Dez-15 A

11-Okt-16 A

309d

08-Dez-15 A

11-Okt-16 A

277d

24-Dez-15 A

25-Sep-16 A

BOILER AREA Piling HRSG Area Block 4 UNIT 42 OC42UHA5-00

PILING 42UHA + TESTING

72d

24-Dez-15 A

05-Mrz-16 A

OC42UHY5-00

PILING PIPE BRIDGE 41/42UHY + TESTING

90d

28-Jun-16 A

25-Sep-16 A

79d

08-Dez-15 A

25-Feb-16 A

79d

08-Dez-15 A

25-Feb-16 A

20d

22-Sep-16 A

11-Okt-16 A

UNIT 41 OC41UHA5-00

PILING 41UHA + TESTING

UNIT 40 OC40ULA5-00

PILING 40ULA + TESTING

Block 3 UNIT 32

20d

22-Sep-16 A

11-Okt-16 A

203d

23-Dez-15 A

13-Jul-16 A 28-Jun-16 A

181d

30-Dez-15 A

OC32UHA5-00

PILING 32UHA + TESTING

90d

30-Dez-15 A

29-Mrz-16 A

OC32UHY5-00

PILING PIPE BRIDGE 31/32UHY + TESTING

20d

08-Jun-16 A

28-Jun-16 A

99d

23-Dez-15 A

31-Mrz-16 A

99d

23-Dez-15 A

31-Mrz-16 A

16d

27-Jun-16 A

13-Jul-16 A

UNIT 31 OC31UHA5-00

PILING 31UHA + TESTING

UNIT 30 OC30ULA5-00

PILING 30ULA + TESTING

Block 2 UNIT 22

16d

27-Jun-16 A

13-Jul-16 A

209d

11-Feb-16 A

07-Sep-16 A 16-Aug-16 A

186d

12-Feb-16 A

OC22UHA5-00

PILING 22UHA + TESTING

82d

12-Feb-16 A

04-Mai-16 A

OC22UHY5-00

PILING PIPE BRIDGE 21/22UHY + TESTING

31d

16-Jul-16 A

16-Aug-16 A

76d

11-Feb-16 A

27-Apr-16 A

76d

11-Feb-16 A

27-Apr-16 A

40d

29-Jul-16 A

07-Sep-16 A

UNIT 21 OC21UHA5-00

PILING 21UHA + TESTING

UNIT 20 OC20ULA5-00

PILING 20ULA + TESTING

Block 1 UNIT 11 OC11UHA5-00

PILING 11UHA + TESTING

40d

29-Jul-16 A

07-Sep-16 A

149d

14-Apr-16 A

10-Sep-16 A

46d

15-Apr-16 A

31-Mai-16 A

46d

15-Apr-16 A

31-Mai-16 A

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 17 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

FOUNDATION 20UBA/UBD (INCL. UBZ OPENING) TRANSPORT PCC 20UBA 4210/4310/4410/4510/4610 NSP - SITE ELECTRICAL COMMISSIONING 20UBA4110 COMMISSIONING ELECTRICAL SYSTE MS (ST)

FOUNDATION 10UBA/UBD (INCL. UBZ OPENING) TRANSPORT PCC 10UBA 4210/4310/4410/4510/4610 NSP - SITE COMMISSIONING ELECTRICAL SYSTE MS (ST) ELECTRICAL COMMISSIONING 10UBA4110

SUMMARY ELECTRICAL ERECTION 40UMA

SUMMARY ELECTRICAL ERECTION 30UMA

SUMMARY ELECTRICAL ERECTION 20UMA

SUMMARY ELECTRICAL ERECTION 10UMA

DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION PUMP 40LCB (w/o MPA ) TRANSPORT CONDENSATE EXTRACTION PUMP 40LCB INDIA-SITE ERECTION CONDENSATE EXTRACTION PUMP 40LCB

DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION PUMP 30LCB (w/o MPA) TRANSPORT CONDENSATE EXTRACTION PUMP 30LCB INDIA-SITE ERECTION CONDENSATE EXTRACTION PUMP 30LCB

DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION PUMP 20LCB (w/o MPA ) TRANSPORT CONDENSATE EXTRACTION PUMP 20LCB KOREA-SITE ERECTION CONDENSATE EXTRACTION PUMP 20LCB

DETAIL DESIGN, MANUFACTURING , SHOP TEST CONDENSATE EXTRACTION PUMP 10LCB (w/o MPA ) TRANSPORT CONDENSATE EXTRACTION PUMP 10LCB KOREA-SITE ERECTION CONDENSATE EXTRACTION PUMP 10LCB

PILING 42UHA + TESTING PILING PIPE BRIDGE 41/42UHY + TESTING

PILING 41UHA + TESTING

PILING 40ULA + TESTING

PILING 32UHA + TESTING PILING PIPE BRIDGE 31/32UHY + TESTING

PILING 31UHA + TESTING

PILING 30ULA + TESTING

PILING 22UHA + TESTING PILING PIPE BRIDGE 21/22UHY + TESTING

PILING 21UHA + TESTING

PILING 20ULA + TESTING

PILING 11UHA + TESTING


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

Layout Name : EG1019_Level2 Dur.

Start

Finish

10-Sep-16 A

149d

14-Apr-16 A

OC12UHA5-00

PILING 12UHA + TESTING

45d

14-Apr-16 A

29-Mai-16 A

OC12UHY5-00

PILING PIPE BRIDGE 11/12UHY + TESTING

18d

23-Aug-16 A

10-Sep-16 A

5d

03-Sep-16 A

08-Sep-16 A

UNIT 12

UNIT 10 OC10ULA5-00

PILING 10ULA + TESTING

Piling UEY Area Block 4 UNIT 42 OC42UEY5-00

PILING PIPE BRIDGE 40/41/42UEY + TESTING

Block 3 UNIT 32 OC32UEY5-00

PILING PIPE BRIDGE 30/31/32UEY + TESTING

Block 2 UNIT 22 OC22UEY5-00

PILING PIPE BRIDGE 20/21/22UEY + TESTING

Block 1 UNIT 12 OC12UEY5-00

PILING PIPE BRIDGE 10/11/12UEY + TESTING

HRSG Block 4 UNIT 42

5d

03-Sep-16 A

08-Sep-16 A

251d

05-Feb-16 A

12-Okt-16 A

50d

29-Feb-16 A

19-Apr-16 A

50d

29-Feb-16 A

19-Apr-16 A

50d

29-Feb-16 A

19-Apr-16 A

47d

17-Apr-16 A

03-Jun-16 A

47d

17-Apr-16 A

03-Jun-16 A

47d

17-Apr-16 A

03-Jun-16 A

228d

05-Feb-16 A

20-Sep-16 A

228d

05-Feb-16 A

20-Sep-16 A

228d

05-Feb-16 A

20-Sep-16 A

236d

20-Feb-16 A

12-Okt-16 A

236d

20-Feb-16 A

12-Okt-16 A

236d

20-Feb-16 A

12-Okt-16 A

767d

06-Mrz-16 A

11-Apr-18

767d

06-Mrz-16 A

11-Apr-18

764d

09-Mrz-16 A

11-Apr-18

0d

09-Mrz-16 A

22d

09-Mrz-16 A

OC42UHA5-10

(H) START PLACING FORMWORK 42UHA

OC42UHA5-15

CONSTRUCTION FOUNDATION 42UHA

OC42UHA5-45

(RFE) FOUNDATION 42UHA

SI42HB-3A25

MANUFACTURING MAIN STE EL STRUCTURE HRSG42

SI42HB-4A25

TRANSPORT MAIN STEEL STRUCTURE HRSG42 THAILAND-SITE

SI42HB-4A40

ON SITE MAIN STEEL STRUCTURE HRSG 42 (FRAME / CASING)

OC42HB-6-15#

SUMMARY ERECTION HRSG 42

SI42HA-4G40

ON SITE FIRST HEATING SURFACES HRSG42

SI42HA-6-56

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 198d 08-Jul-17 A

OC42HA-6A15#

SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 224dINSULATION) 11-Jul-17 A HRSG42 19-Feb-18

OC42HA-6-55

PRESSURE TEST HRSG42

SI42HA-6-70&

HRSG42 - READY FOR HOT GAS / AUGMENTED BYPASS OP

UNIT 41

0d

47d

01-Feb-17 A

19-Mrz-17 A

0d

20-Mrz-17 A

349d

30-Mrz-17 A

0d

PILING PIPE BRIDGE 20/21/22UEY + TESTING

PILING PIPE BRIDGE 10/11/12UEY + TESTING

CONSTRUCTION FOUNDATION 42UHA (RFE) FOUNDATION 42UHA MANUFACTURING MAIN STEEL STRUCTURE HRSG42 TRANSPORT MAIN STEEL STRUCTURE HRSG42 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 42 (FRAME / CASING) SUMMARY ERECTION HRSG 42

28-Dez-17

0d

ON SITE FIRST HEATING SURFACES HRSG42

21-Jan-18

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) SUMMARY ERECTION PRESSURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG42

21-Jan-18

PRESSURE TEST HRSG42

11-Apr-18 06-Mrz-16 A

HRSG42 - READY FOR HOT GAS / AUGMENTED BYPASS OP

11-Apr-18

(H) START PLACING FORMWORK 41UHA

0d

06-Mrz-16 A

OC41UHA5-15

CONSTRUCTION FOUNDATION 41UHA

9d

06-Mrz-16 A

OC41UHA5-45

(RFE) FOUNDATION 41UHA

0d

SI41HB-3A25

MANUFACTURING MAIN STE EL STRUCTURE HRSG41

SI41HB-4A25

TRANSPORT MAIN STEEL STRUCTURE HRSG41 THAILAND-SITE

SI41HB-4A40

ON SITE MAIN STEEL STRUCTURE HRSG 41 (FRAME / CASING)

OC41HB-6-15#

SUMMARY ERECTION HRSG 41

SI41HA-4G40

ON SITE FIRST HEATING SURFACES HRSG41

OC41HA-6A15#

SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 233dINSULATION) 02-Mai-17 HRSG41 A 20-Dez-17

SI41HA-6-56

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 138d 08-Jul-17 A

22-Nov-17

OC41HA-6-55

PRESSURE TEST HRSG41

22-Nov-17

SI41HA-6-70&

HRSG41 - READY FOR HOT GAS / AUGMENTED BYPASS OP

(H) START PLACING FORMWORK 41UHA 15-Mrz-16 A

CONSTRUCTION FOUNDATION 41UHA

15-Mrz-16 A 06-Sep-16 A

11-Jan-17 A

37d

11-Jan-17 A

16-Feb-17 A

0d

17-Feb-17 A

316d

13-Mrz-17 A

0d

(RFE) FOUNDATION 41UHA MANUFACTURING MAIN STEEL STRUCTURE HRSG41 TRANSPORT MAIN STEEL STRUCTURE HRSG41 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 41 (FRAME / CASING)

22-Jan-18

SUMMARY ERECTION HRSG 41

12-Apr-17 A

30-Okt-17

0d

ON SITE FIRST HEATING SURFACES HRSG41 SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG41 INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) PRESSURE TEST HRSG41

11-Apr-18

677d

02-Apr-16 A

07-Feb-18

677d

02-Apr-16 A

07-Feb-18

0d

02-Apr-16 A

12d

02-Apr-16 A

OC32UHA5-10

(H) START PLACING FORMWORK 32UHA

OC32UHA5-15

CONSTRUCTION FOUNDATION 32UHA

OC32UHA5-45

(RFE) FOUNDATION 32UHA

SI32HB-3A25

MANUFACTURING MAIN STE EL STRUCTURE HRSG32

SI32HB-4A25

TRANSPORT MAIN STEEL STRUCTURE HRSG32 THAILAND-SITE

SI32HB-4A40

ON SITE MAIN STEEL STRUCTURE HRSG 32 (FRAME / CASING)

OC32HB-6-15#

SUMMARY ERECTION HRSG 32

SI32HA-4G40

ON SITE FIRST HEATING SURFACES HRSG32

OC32HA-6A15#

SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 211dINSULATION) 24-Apr-17 HRSG32 A 20-Nov-17

SI32HA-6-56

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 108d 08-Jul-17 A

OC32HA-6-55

PRESSURE TEST HRSG32

SI32HA-6-70&

HRSG32 - READY FOR HOT GAS / AUGMENTED BYPASS OP

UNIT 31

PILING PIPE BRIDGE 30/31/32UEY + TESTING

28-Mai-17 A

767d

0d

HRSG41 - READY FOR HOT GAS / AUGMENTED BYPASS OP

(H) START PLACING FORMWORK 32UHA 14-Apr-16 A

CONSTRUCTION FOUNDATION 32UHA

14-Apr-16 A

131d

23-Jul-16 A

30-Nov-16 A

47d

01-Dez-16 A

16-Jan-17 A

0d

17-Jan-17 A

335d

01-Feb-17 A

0d

35d

PILING PIPE BRIDGE 40/41/42UEY + TESTING

13-Mrz-18

OC41UHA5-10

Block 3 UNIT 32

PILING 10ULA + TESTING

31-Mrz-16 A 31-Jan-17 A

24d

PILING PIPE BRIDGE 11/12UHY + TESTING

(H) START PLACING FORMWORK 42UHA

26-Sep-16 A

127d

PILING 12UHA + TESTING

31-Mrz-16 A

128d

25d

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 18 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

(RFE) FOUNDATION 32UHA MANUFACTURING MAIN STEEL STRUCTURE HRSG32 TRANSPORT MAIN STEEL STRUCTURE HRSG32 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 32 (FRAME / CASING)

01-Jan-18

SUMMARY ERECTION HRSG 32

12-Mrz-17 A

19-Sep-17

0d

ON SITE FIRST HEATING SURFACES HRSG32 SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG32

23-Okt-17

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275)

23-Okt-17

PRESSURE TEST HRSG32

07-Feb-18

665d

12-Apr-16 A

0d

12-Apr-16 A

11d

12-Apr-16 A

HRSG32 - READY FOR HOT GAS / AUGMENTED BYPASS OP

05-Feb-18

OC31UHA5-10

(H) START PLACING FORMWORK 31UHA

OC31UHA5-15

CONSTRUCTION FOUNDATION 31UHA

OC31UHA5-45

(RFE) FOUNDATION 31UHA

SI31HB-3A25

MANUFACTURING MAIN STE EL STRUCTURE HRSG31

SI31HB-4A25

TRANSPORT MAIN STEEL STRUCTURE HRSG31 THAILAND-SITE

SI31HB-4A40

ON SITE MAIN STEEL STRUCTURE HRSG 31 (FRAME / CASING)

OC31HB-6-15#

SUMMARY ERECTION HRSG 31

SI31HA-4G40

ON SITE FIRST HEATING SURFACES HRSG31

OC31HA-6A15#

SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 202dINSULATION) 02-Apr-17 HRSG31 A 20-Okt-17

SI31HA-6-56

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 77d 08-Jul-17 A

22-Sep-17

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275)

OC31HA-6-55

PRESSURE TEST HRSG31

22-Sep-17

PRESSURE TEST HRSG31

SI31HA-6-70&

HRSG31 - READY FOR HOT GAS / AUGMENTED BYPASS OP

0d

(H) START PLACING FORMWORK 31UHA 23-Apr-16 A

CONSTRUCTION FOUNDATION 31UHA

23-Apr-16 A

(RFE) FOUNDATION 31UHA

137d

23-Jun-16 A

07-Nov-16 A

47d

17-Nov-16 A

02-Jan-17 A

0d

03-Jan-17 A

363d

04-Jan-17 A

0d

24d 0d

TRANSPORT MAIN STEEL STRUCTURE HRSG31 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 31 (FRAME / CASING)

01-Jan-18 08-Mrz-17 A

30-Aug-17

MANUFACTURING MAIN STE EL STRUCTURE HRSG31

05-Feb-18

SUMMARY ERECTION HRSG 31 ON SITE FIRST HEATING SURFACES HRSG31 SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG31

HRSG31 - READY FOR HOT GAS / AUGMENTED BYPASS OP


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

Block 2 UNIT 22

Layout Name : EG1019_Level2 Dur.

Start

Finish

684d

22-Mrz-16 A

03-Feb-18

626d

19-Mai-16 A

03-Feb-18

OC22UHA5-10

(H) START PLACING FORMWORK 22UHA

0d

19-Mai-16 A

OC22UHA5-15

CONSTRUCTION FOUNDATION 22UHA

6d

19-Mai-16 A

OC22UHA5-45

(RFE) FOUNDATION 22UHA

0d

SI22HB-3A25

MANUFACTURING MAIN STE EL STRUCTURE HRSG22

SI22HB-4A25

TRANSPORT MAIN STEEL STRUCTURE HRSG22 THAILAND-SITE

SI22HB-4A40

ON SITE MAIN STEEL STRUCTURE HRSG 22 (FRAME / CASING)

OC22HB-6-15#

SUMMARY ERECTION HRSG 22

SI22HA-4G40

ON SITE FIRST HEATING SURFACES HRSG22

OC22HA-6A15#

SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 233dINSULATION) 16-Feb-17 HRSG22 A 06-Okt-17

SI22HA-6-56

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 63d 08-Jul-17 A

08-Sep-17

OC22HA-6-55

PRESSURE TEST HRSG22

08-Sep-17

SI22HA-6-70&

HRSG22 - READY FOR HOT GAS / AUGMENTED BYPASS OP

UNIT 21

133d

(H) START PLACING FORMWORK 22UHA 25-Mai-16 A

CONSTRUCTION FOUNDATION 22UHA

25-Mai-16 A 05-Jun-16 A

15-Okt-16 A

31d

16-Okt-16 A

16-Nov-16 A

0d

21-Nov-16 A

383d

03-Dez-16 A

0d

24d

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 19 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

16-Aug-17*

TRANSPORT MAIN STEEL STRUCTURE HRSG22 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 22 (FRAME / CASING)

20-Dez-17 17-Jan-17 A

0d

(RFE) FOUNDATION 22UHA MANUFACTURING MAIN STE EL STRUCTURE HRSG22

SUMMARY ERECTION HRSG 22 ON SITE FIRST HEATING SURFACES HRSG22 SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG22 INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) PRESSURE TEST HRSG22

03-Feb-18

682d

22-Mrz-16 A

01-Feb-18

163d

22-Mrz-16 A

31-Aug-16 A

0d

07-Mai-16 A

13d

07-Mai-16 A

HRSG22 - READY FOR HOT GAS / AUGMENTED BYPASS OP

SI21HB-3A25

MANUFACTURING MAIN STE EL STRUCTURE HRSG21

OC21UHA5-10

(H) START PLACING FORMWORK 21UHA

OC21UHA5-15

CONSTRUCTION FOUNDATION 21UHA

OC21UHA5-45

(RFE) FOUNDATION 21UHA

SI21HB-4A25

TRANSPORT MAIN STEEL STRUCTURE HRSG21 THAILAND-SITE

SI21HB-4A40

ON SITE MAIN STEEL STRUCTURE HRSG 21 (FRAME / CASING)

OC21HB-6-15#

SUMMARY ERECTION HRSG 21

SI21HA-4G40

ON SITE FIRST HEATING SURFACES HRSG21

OC21HA-6A15#

SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 253dINSULATION) 21-Jan-17 HRSG21 A 30-Sep-17

SI21HA-6-56

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 57d 08-Jul-17 A

02-Sep-17

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275)

OC21HA-6-55

PRESSURE TEST HRSG21

02-Sep-17

PRESSURE TEST HRSG21

SI21HA-6-70&

HRSG21 - READY FOR HOT GAS / AUGMENTED BYPASS OP

Block 1 UNIT 11

0d 56d

01-Sep-16 A

0d

24-Okt-16 A

422d

31-Okt-16 A

0d

24d

20-Mai-16 A

CONSTRUCTION FOUNDATION 21UHA

20-Mai-16 A

(RFE) FOUNDATION 21UHA

27-Okt-16 A

10-Aug-17*

26-Dez-17

07-Mrz-16 A

700d

07-Mrz-16 A

04-Feb-18

147d

07-Mrz-16 A

31-Jul-16 A

0d

24-Jul-16 A

MANUFACTURING MAIN STE EL STRUCTURE HRSG11

OC11UHA5-10

(H) START PLACING FORMWORK 11UHA

OC11UHA5-15

CONSTRUCTION FOUNDATION 11UHA

SI11HB-4A25

TRANSPORT MAIN STEEL STRUCTURE HRSG11 THAILAND-SITE

OC11UHA5-45

(RFE) FOUNDATION 11UHA

SI11HB-4A40

ON SITE MAIN STEEL STRUCTURE HRSG 11 (FRAME / CASING)

OC11HB-6-15#

SUMMARY ERECTION HRSG 11

SI11HA-4G40

ON SITE FIRST HEATING SURFACES HRSG11

OC11HA-6A15#

SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 267dINSULATION) 01-Jan-17 HRSG11 A 24-Sep-17

SI11HA-6-56

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 41d 08-Jul-17 A

17-Aug-17

OC11HA-6-55

PRESSURE TEST HRSG11

17-Aug-17

SI11HA-6-70&

HRSG11 - READY FOR HOT GAS / AUG MENTE D BYPASS OP

9d

24-Jul-16 A

02-Aug-16 A

01-Aug-16 A

14-Sep-16 A

0d

02-Aug-16 A

0d

15-Sep-16 A

415d

05-Okt-16 A

0d

24-Jul-17 A

MANUFACTURING MAIN STE EL STRUCTURE HRSG11

CONSTRUCTION FOUNDATION 11UHA TRANSPORT MAIN STEEL STRUCTURE HRSG11 THAILAND-SITE (RFE) FOUNDATION 11UHA ON SITE MAIN STEEL STRUCTURE HRSG 11 (FRAME / CASING)

23-Nov-17 16-Nov-16 A

0d

HRSG21 - READY FOR HOT GAS / AUGMENTED BYPASS OP

(H) START PLACING FORMWORK 11UHA

45d

649d

SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG21

06-Feb-18

SI11HB-3A25

UNIT 12

SUMMARY ERECTION HRSG 21 ON SITE FIRST HEATING SURFACES HRSG21

01-Feb-18

702d

25d

TRANSPORT MAIN STEEL STRUCTURE HRSG21 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 21 (FRAME / CASING)

30-Nov-16 A

0d

MANUFACTURING MAIN STE EL STRUCTURE HRSG21 (H) START PLACING FORMWORK 21UHA

SUMMARY ERECTION HRSG 11 ON SITE FIRST HEATING SURFACES HRSG11 SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG11 INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) PRESSURE TEST HRSG11

04-Feb-18 29-Apr-16 A

06-Feb-18

155d

29-Apr-16 A

30-Sep-16 A

0d

19-Jun-16 A

22d

19-Jun-16 A

HRSG11 - READY FOR HOT GAS / AUG MENTE D BYPASS OP

SI12HB-3A25

MANUFACTURING MAIN STE EL STRUCTURE HRSG12

OC12UHA5-10

(H) START PLACING FORMWORK 12UHA

OC12UHA5-15

CONSTRUCTION FOUNDATION 12UHA

OC12UHA5-45

(RFE) FOUNDATION 12UHA

SI12HB-4A25

TRANSPORT MAIN STEEL STRUCTURE HRSG12 THAILAND-SITE

SI12HB-4A40

ON SITE MAIN STEEL STRUCTURE HRSG 12 (FRAME / CASING)

OC12HB-6-15#

SUMMARY ERECTION HRSG 12

SI12HA-4G40

ON SITE FIRST HEATING SURFACES HRSG12

OC12HA-6A15#

SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. 244dINSULATION) 20-Feb-17 HRSG12 A 21-Okt-17

SI12HA-6-56

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275) 78d 08-Jul-17 A

23-Sep-17

INVESTIGATE / REPAIR DAMAGE OF MODULES (LETTER SSM-OC-L-00275)

OC12HA-6-55

PRESSURE TEST HRSG12

23-Sep-17

PRESSURE TEST HRSG12

SI12HA-6-70&

HRSG12 - READY FOR HOT GAS / AUGMENTED BYPASS OP

Power Control Center HRSG Block 4 UNIT 42

0d 01-Okt-16 A

0d

17-Nov-16 A

364d

25-Nov-16 A

0d

24d

(H) START PLACING FORMWORK 12UHA 10-Jul-16 A 10-Jul-16 A

57d

27-Nov-16 A

31-Aug-17

225d

19-Feb-17 A

01-Okt-17

100d

22-Jun-17 A

29-Sep-17

97d

23-Jun-17 A

27-Sep-17

27d

23-Jun-17 A

19-Jul-17 A

OC42UBA7L15

ERECTION PCC 42UBA1110

28d

31-Aug-17

27-Sep-17

100d

22-Jun-17 A

29-Sep-17

SI41UBA4-25

TRANSPORT PCC 41UBA1110 NSP - SITE

28d

22-Jun-17 A

19-Jul-17 A

OC41UBA7L15

ERECTION PCC 41UBA1110

28d

02-Sep-17

29-Sep-17

134d

21-Mai-17 A

01-Okt-17

134d

21-Mai-17 A

01-Okt-17

SI32UBA4-25

TRANSPORT PCC 32UBA1110 WORKSHOP - SITE

30d

21-Mai-17 A

19-Jun-17 A

OC32UBA7L15

ERECTION PCC 32UBA1110

28d

04-Sep-17

01-Okt-17

93d

21-Mai-17 A

21-Aug-17

UNIT 31 SI31UBA4-25

TRANSPORT PCC 31UBA1110 WORKSHOP - SITE

30d

21-Mai-17 A

19-Jun-17 A

OC31UBA7L15

ERECTION PCC 31UBA1110

31d

22-Jul-17 A

21-Aug-17

170d

14-Mrz-17 A

30-Aug-17

Block 2 UNIT 22

SUMMARY ERECTION HRSG 12 ON SITE FIRST HEATING SURFACES HRSG12 SUMMARY ERECTION PRES SURE PARTS (HARPS, DRUMS, PIPING INCL. INSULATION) HRSG12

06-Feb-18

TRANSPORT PCC 42UBA1110 NSP - SITE

Block 3 UNIT 32

(RFE) FOUNDATION 12UHA TRANSPORT MAIN STEEL STRUCTURE HRSG12 THAILAND-SITE ON SITE MAIN STEEL STRUCTURE HRSG 12 (FRAME / CASING)

SI42UBA4-25

UNIT 41

CONSTRUCTION FOUNDATION 12UHA

23-Nov-17 13-Dez-16 A

0d

MANUFACTURING MAIN STE EL STRUCTURE HRSG12

170d

14-Mrz-17 A

30-Aug-17

SI22UBA4-25

TRANSPORT PCC 22UBA1110 TO SITE

35d

14-Mrz-17 A

17-Apr-17 A

OC22UBA7L15

ERECTION PCC 22UBA1110

21d

10-Aug-17

30-Aug-17

HRSG12 - READY FOR HOT GAS / AUGMENTED BYPASS OP

TRANSPORT PCC 42UBA1110 NSP - SITE ERECTION PCC 42UBA1110

TRANSPORT PCC 41UBA1110 NSP - SITE ERECTION PCC 41UBA1110

TRANSPORT PCC 32UBA1110 WORKSHOP - SITE ERECTION PCC 32UBA1110

TRANSPORT PCC 31UBA1110 WORKSHOP - SITE ERECTION PCC 31UBA1110

TRANSPORT PCC 22UBA1110 TO SITE ERECTION PCC 22UBA1110


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

Layout Name : EG1019_Level2 Dur.

Start

Finish

152d

14-Mrz-17 A

12-Aug-17

SI21UBA4-25

TRANSPORT PCC 21UBA1110 TO SITE

35d

14-Mrz-17 A

17-Apr-17 A

OC21UBA7L15

ERECTION PCC 21UBA1110

68d

06-Jun-17 A

12-Aug-17

191d

19-Feb-17 A

28-Aug-17 24-Jun-17 A

UNIT 21

Block 1 UNIT 11

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 20 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 TRANSPORT PCC 21UBA1110 TO SITE ERECTION PCC 21UBA1110

125d

19-Feb-17 A

SI11UBA4-25

TRANSPORT PCC 11UBA1110 TO SITE

32d

19-Feb-17 A

22-Mrz-17 A

TRANSPORT PCC 11UBA1110 TO SITE

OC11UBA7L15

ERECTION PCC 11UBA1110

18d

06-Jun-17 A

24-Jun-17 A

ERECTION PCC 11UBA1110

181d

01-Mrz-17 A

28-Aug-17

UNIT 12 SI12UBA4-25

TRANSPORT PCC 12UBA1110 TO SITE

35d

01-Mrz-17 A

04-Apr-17 A

OC12UBA7L15

ERECTION PCC 12UBA1110

21d

08-Aug-17*

28-Aug-17

581d

11-Feb-16 A

13-Sep-17

403d

07-Aug-16 A

13-Sep-17

403d

07-Aug-16 A

Structure for Feed Water Pump ULA Block 4 UNIT 40

ERECTION PCC 12UBA1110

13-Sep-17

SI40LAC3B25

DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 40LAC 320d 07-Aug-16 A

23-Jun-17 A

OC40ULA5-15#

SUMMARY CONSTRUCTION FOUNDATION 40ULA

39d

17-Mai-17 A

24-Jun-17 A

SI40LAC4B25

TRANSPORT FEEDWATER PUMP 40LAC NSP-SITE

18d

25-Jun-17 A

13-Jul-17 A

OC40ULA5B15

ERECTION STEEL STRUCTURE 40ULA

37d

01-Jul-17 A

06-Aug-17

OC40LAC6B15

ERECTION FEEDWATER PUMPS LAC

28d

17-Aug-17

13-Sep-17

463d

08-Jun-16 A

13-Sep-17

463d

08-Jun-16 A

Block 3 UNIT 30

TRANSPORT PCC 12UBA1110 TO SITE

DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 40LAC SUMMARY CONSTRUCTION FOUNDATION 40ULA TRANSPORT FEEDWATER PUMP 40LAC NSP-SITE ERECTION STEEL STRUCTURE 40ULA ERECTION FEEDWATER PUMPS LAC

13-Sep-17

SI30LAC3B25

DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 30LAC 343d 08-Jun-16 A

16-Mai-17 A

SI30LAC4B25

TRANSPORT FEEDWATER PUMP 30LAC NSP-SITE

34d

17-Mai-17 A

19-Jun-17 A

TRANSPORT FEEDWATER PUMP 30LAC NSP-SITE

OC30ULA5-15#

SUMMARY CONSTRUCTION FOUNDATION 30ULA

35d

27-Mai-17 A

30-Jun-17 A

SUMMARY CONSTRUCTION FOUNDATION 30ULA

OC30ULA5B15

ERECTION STEEL STRUCTURE 30ULA

26d

12-Jul-17 A

06-Aug-17

OC30LAC6B15

ERECTION FEEDWATER PUMPS LAC

28d

17-Aug-17

13-Sep-17

494d

09-Apr-16 A

15-Aug-17

494d

09-Apr-16 A

Block 2 UNIT 20

DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 20LAC 315d 09-Apr-16 A

18-Feb-17 A

SI20LAC4B25

TRANSPORT FEEDWATER PUMP 20LAC NSP-SITE

31d

19-Feb-17 A

22-Mrz-17 A

OC20ULA5-15#

SUMMARY CONSTRUCTION FOUNDATION 20ULA

14d

10-Mai-17 A

24-Mai-17 A

OC20ULA5B15

ERECTION STEEL STRUCTURE 20ULA

80d

28-Mai-17 A

15-Aug-17

OC20LAC6B15

ERECTION FEEDWATER PUMPS LAC

30d

12-Jun-17 A

12-Jul-17 A

547d

11-Feb-16 A

10-Aug-17

547d

11-Feb-16 A

DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 10LAC 343d 11-Feb-16 A

18-Jan-17 A

OC10ULA5-15#

SUMMARY CONSTRUCTION FOUNDATION 10ULA

22d

12-Jan-17 A

02-Feb-17 A

SI10LAC4B25

TRANSPORT FEEDWATER PUMP 10LAC NSP-SITE

26d

19-Jan-17 A

13-Feb-17 A

OC10ULA5B15

ERECTION STEEL STRUCTURE 10ULA

90d

13-Mai-17 A

10-Aug-17

OC10LAC6B15

ERECTION FEEDWATER PUMPS LAC

26d

17-Mai-17 A

11-Jun-17 A

246d

27-Sep-16 A

31-Mai-17 A

44d

27-Sep-16 A

09-Nov-16 A

Block 4 UNIT 42 OC42UHY5-15#

44d

27-Sep-16 A

09-Nov-16 A

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 42UHY 44d

27-Sep-16 A

09-Nov-16 A

22d

18-Okt-16 A

08-Nov-16 A

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 41UHY 22d

18-Okt-16 A

08-Nov-16 A

37d

09-Okt-16 A

15-Nov-16 A

UNIT 41 OC41UHY5-15#

Block 3 UNIT 32 OC32UHY5-15#

37d

09-Okt-16 A

15-Nov-16 A

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 32UHY 37d

09-Okt-16 A

15-Nov-16 A

37d

09-Okt-16 A

15-Nov-16 A

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 31UHY 37d

09-Okt-16 A

15-Nov-16 A

206d

06-Nov-16 A

31-Mai-17 A

UNIT 31 OC31UHY5-15#

Block 2 UNIT 22 OC22UHY5-15#

206d

06-Nov-16 A

31-Mai-17 A

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 22UHY206d

06-Nov-16 A

31-Mai-17 A

131d

13-Nov-16 A

24-Mrz-17 A

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 21UHY131d

13-Nov-16 A

24-Mrz-17 A

90d

19-Okt-16 A

17-Jan-17 A

UNIT 21 OC21UHY5-15#

Block 1 UNIT 11 OC11UHY5-15#

36d

12-Dez-16 A

17-Jan-17 A

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 11UHY 36d

12-Dez-16 A

17-Jan-17 A

19d

19-Okt-16 A

07-Nov-16 A

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 12UHY 19d

19-Okt-16 A

07-Nov-16 A

487d

27-Feb-16 A

27-Jun-17 A

191d

26-Mrz-16 A

02-Okt-16 A

70d

26-Mrz-16 A

04-Jun-16 A

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 40/41/42UEY 70d 26-Mrz-16 A

04-Jun-16 A

UNIT 12 OC12UHY5-15#

Concrete / Formwork / Reinforcement UEY Block 4 UNIT 42 OC42UEY5-15#

121d

04-Jun-16 A

02-Okt-16 A

121d

04-Jun-16 A

02-Okt-16 A

366d

09-Mai-16 A

10-Mai-17 A

89d

09-Mai-16 A

06-Aug-16 A

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 30/31/32UEY 89d 09-Mai-16 A

06-Aug-16 A

UNIT 41 OC41UEY5B15

ERECTION STEEL STRUCTURE PIPE BRIDGE 41UEY

Block 3 UNIT 32 OC32UEY5-15#

318d

26-Jun-16 A

10-Mai-17 A

318d

26-Jun-16 A

10-Mai-17 A

415d

27-Feb-16 A

17-Apr-17 A

269d

27-Feb-16 A

22-Nov-16 A

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 20/21/22UEY 269d 27-Feb-16 A

22-Nov-16 A

UNIT 31 OC31UEY5B15

Block 2 UNIT 22 OC22UEY5-15#

UNIT 21

ERECTION STEEL STRUCTURE PIPE BRIDGE 31UEY

128d

10-Dez-16 A

ERECTION FEEDWATER PUMPS LAC

DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 20LAC TRANSPORT FEEDWATER PUMP 20LAC NSP-SITE SUMMARY CONSTRUCTION FOUNDATION 20ULA ERECTION STEEL STRUCTURE 20ULA ERECTION FEEDWATER PUMPS LAC

10-Aug-17

SI10LAC3B25

Pipe Bridge UHY

ERECTION STEEL STRUCTURE 30ULA

15-Aug-17

SI20LAC3B25

Block 1 UNIT 10

DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 30LAC

17-Apr-17 A

DETAIL DESIGN, MANUFACTURING , SHOP TEST FEEDWATER PUMP 10LAC SUMMARY CONSTRUCTION FOUNDATION 10ULA TRANSPORT FEEDWATER PUMP 10LAC NSP-SITE ERECTION STEEL STRUCTURE 10ULA ERECTION FEEDWATER PUMPS LAC

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 42UHY

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 41UHY

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 32UHY

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 31UHY

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 22UHY

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 21UHY

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 11UHY

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 12UHY

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 40/41/42UEY

ERECTION STEEL STRUCTURE PIPE BRIDGE 41UEY

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 30/31/32UEY

ERECTION STEEL STRUCTURE PIPE BRIDGE 31UEY

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 20/21/22UEY


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

OC21UEY5B15

Activity Name

Dur.

Start

ERECTION STEEL STRUCTURE PIPE BRIDGE 21UEY

128d

10-Dez-16 A

17-Apr-17 A

270d

01-Okt-16 A

27-Jun-17 A

147d

01-Feb-17 A

27-Jun-17 A

147d

01-Feb-17 A

27-Jun-17 A

40d

01-Okt-16 A

09-Nov-16 A

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 10/11/12UEY 40d 01-Okt-16 A

09-Nov-16 A

Block 1 UNIT 11 OC11UEY5B15

Layout Name : EG1019_Level2

ERECTION STEEL STRUCTURE PIPE BRIDGE 11UEY

UNIT 12 OC12UEY5-15#

Finish

589d

24-Jun-16 A

02-Feb-18

589d

24-Jun-16 A

02-Feb-18

589d

24-Jun-16 A

02-Feb-18

589d

24-Jun-16 A

02-Feb-18

OC-----6A15#

SUMMARY ERECTION / INSULATION WATER STEAM CYCLE (G-/P-/L SY 589d STEMS) 24-Jun-16 A

OC--L--6A15#

SUMMARY ERECTION WATER S TEAM CYCLE (L SYSTEMS)

SYSTEMS / PIPING / COMMISSIONING Piping Erection General GENERAL

Block 4 UNIT 42 OC42---6A15#

SUMMARY ERECTION WATER S TEAM CYCLE 42 (P-/L SYSTEMS)

UNIT 40 OC40---6H15#

SUMMARY ERECTION WATER S TEAM CYCLE 40 (P-/L SYSTEMS)

Block 3 UNIT 32 OC32---6A15#

SUMMARY ERECTION WATER S TEAM CYCLE 32 (P-/L SYSTEMS)

UNIT 30 OC30---6H15#

SUMMARY ERECTION WATER S TEAM CYCLE 30 (P-/L SYSTEMS)

Block 2 UNIT 22 OC22---6A15#

SUMMARY ERECTION WATER S TEAM CYCLE 22 (P-/L SYSTEMS)

UNIT 20 OC20---6H15#

SUMMARY ERECTION WATER S TEAM CYCLE 20 (P-/L SYSTEMS)

Block 1 UNIT 12 OC12---6A15#

SUMMARY ERECTION WATER S TEAM CYCLE 12 (P-/L SYSTEMS)

UNIT 10 OC10---6H15#

SUMMARY ERECTION WATER S TEAM CYCLE 10 (P-/L SYSTEMS)

CIRCULATING WATER AREA Piling Circulating Cooling Water Area

SUMMARY ERECTION / INSULATION WATER STEAM CYCLE (G-/P-/L SY STEMS)

02-Feb-18

SUMMARY ERECTION WATER S TEAM CYCLE (L SYSTEMS)

589d

24-Jun-16 A

02-Feb-18

479d

12-Okt-16 A

02-Feb-18

479d

12-Okt-16 A

02-Feb-18

560d

24-Jun-16 A

04-Jan-18

560d

24-Jun-16 A

04-Jan-18

516d

20-Jul-16 A

17-Dez-17

427d

12-Okt-16 A

12-Dez-17

427d

12-Okt-16 A

12-Dez-17

516d

20-Jul-16 A

17-Dez-17

516d

20-Jul-16 A

17-Dez-17

406d

21-Okt-16 A

30-Nov-17

253d

21-Mrz-17 A

28-Nov-17

253d

21-Mrz-17 A

28-Nov-17

406d

21-Okt-16 A

30-Nov-17

406d

21-Okt-16 A

30-Nov-17

418d

11-Okt-16 A

02-Dez-17

209d

19-Mrz-17 A

13-Okt-17

209d

19-Mrz-17 A

13-Okt-17

418d

11-Okt-16 A

02-Dez-17

418d

11-Okt-16 A

02-Dez-17

1082d

29-Sep-15 A

14-Sep-18

109d

01-Apr-16 A

19-Jul-16 A

64d

16-Mai-16 A

19-Jul-16 A

64d

16-Mai-16 A

19-Jul-16 A

64d

16-Mai-16 A

19-Jul-16 A

OC40URD5-00

PILING URD + TESTING

27d

13-Jun-16 A

10-Jul-16 A

46d

15-Mai-16 A

30-Jun-16 A

46d

15-Mai-16 A

30-Jun-16 A

41d

15-Mai-16 A

25-Jun-16 A

8d

22-Jun-16 A

30-Jun-16 A

75d

01-Apr-16 A

15-Jun-16 A

75d

01-Apr-16 A

15-Jun-16 A

Block 3 UNIT 30 PILING URD + TESTING

Block 2 UNIT 20 OC20URA5-00

PILING URA/URL + TESTING

54d

01-Apr-16 A

25-Mai-16 A

OC20URD5-00

PILING URD + TESTING

20d

26-Mai-16 A

15-Jun-16 A

18d

31-Mai-16 A

18-Jun-16 A

18d

31-Mai-16 A

18-Jun-16 A

18d

31-Mai-16 A

18-Jun-16 A

934d

04-Okt-15 A

24-Apr-18

934d

04-Okt-15 A

24-Apr-18

934d

04-Okt-15 A

24-Apr-18

Block 1 UNIT 10 OC10URD5-00

PILING URD + TESTING

STRUCTURE FOR CIRCULATING WATER INLET CULVERT General COMMON

SUMMARY CONSTRUCTION FOUNDATION INCL. EXCAVATION 10/11/12UEY

02-Feb-18

PILING URA/URL + TESTING

OC30URD5-00

ERECTION STEEL STRUCTURE PIPE BRIDGE 11UEY

12-Okt-16 A

OC40URA5-00

PILING URA/URL + TESTING

ERECTION STEEL STRUCTURE PIPE BRIDGE 21UEY

479d

Block 4 UNIT 40

OC30URA5-00

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 21 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

SUMMARY ERECTION WATER S TEAM CYCLE 42 (P-/L SYSTEMS)

SUMMARY ERECTION WATER STEAM CYCLE 40 (P-/L SYSTEMS)

SUMMARY ERECTION WATER S TEAM CYCLE 32 (P-/L SYSTEMS) SUMMARY ERECTION WATER STEAM CYCLE 30 (P-/L SYSTEMS)

SUMMARY ERECTION WATER S TEAM CYCLE 22 (P-/L SYSTEMS) SUMMARY ERECTION WATER S TEAM CYCLE 20 (P-/L SYSTEMS)

SUMMARY ERECTION WATER S TEAM CYCLE 12 (P-/L SYSTEMS) SUMMARY ERECTION WATER S TEAM CYCLE 10 (P-/L SYSTEMS)

PILING URA/URL + TESTING PILING URD + TESTING

PILING URA/URL + TESTING PILING URD + TESTING

PILING URA/URL + TESTING PILING URD + TESTING

PILING URD + TESTING

OC00UPC2-76

PREPARATION BASIC BUILDING DWGS

34d

04-Okt-15 A

07-Nov-15 A

OC00UPC2-79

DETAIL DESIGN, CHECKER CONCRETE STRUCTURE

83d

08-Nov-15 A

30-Jan-16 A

OC00UQB2-61

START NUMERIC MODELLING

OC00UQB2-45

PREPARATION BASIC BUILDING DWGS UQB/UPN

OC00UQB2-62

PREPARTION OF NUMERIC MODELLING STUDY

OC00UQB2A70

DETAIL DESIGN, CHECKER CONCRETE STRUCTURE UQB/UPN

OC00UPN2-83 OC00UPN2-81

DETAIL DESIGN DRAW INGS - ONSHORE

15d

26-Mrz-16 A

10-Apr-16 A

OC00UPN2-79

PRELIMINARY STUDIES UP B

29d

01-Jun-16 A

30-Jun-16 A

OC00UPN2-80

PRE-ENGINEERING SURVEY UPB

30d

15-Jun-16 A

15-Jul-16 A

OC00UPB2-85

SUMMARY ENGINEERING INLET PIPES LINE - OFFSHORE - TIDEWAY461d

04-Aug-16 A

07-Nov-17

OC00UPC5-61

VELOCITY CAP DESIGN ( INCLUDE FOUNDATION)

365d

06-Okt-16 A

05-Okt-17

OC00UPN5-51

SUMMARY INS TALAION OF ONSHORE PIPE LINES

327d

09-Okt-16 A

31-Aug-17

OC00UPN5-62

RENT QUAY WALL AND STORAGE AREA AT IDKU

435d

09-Okt-16 A

17-Dez-17

OC00UPN2-41

ASSIGNING SUB-CONTRACTOR

0d

09-Okt-16 A

OC00UPN5-66

PROC, MANUFA CTURING & DELIVERY HDPE PIPES + ACCESSORIES121d

27-Okt-16 A

24-Feb-17 A

OC00UQB5E15#

CIVIL W ORKS COOLING STRUCTURE UQ B/UPN (PUMP AREA)

25-Nov-16 A

13-Sep-17

OC00UPB2-87

SUMMARY ENGINEERING INLET PIPES LINE - OFFSHORE - PIPELIFE

25-Nov-16 A

25-Nov-16 A

SUMMARY ENGINEERING IN LET PIPES LINE - OFFSHORE - PIPELIFE

OC00UPB2-86

SUMMARY FABRICATIO N & PROCURME NT INLET PIPES LINE - OFFSHORE 0d - PIPELIFE 25-Nov-16 A

25-Nov-16 A

SUMMARY FABRICATIO N & PROCURME NT INLET PIPES LINE - OFFSHORE - PIPELIFE

OC00UPN5-71

PROC, MANUFA CTURING & DELIVERY SHEET PILES

86d

30-Nov-16 A

23-Feb-17 A

PROC, MANUFA CTURING & DELIVERY SHEET PILES

OC00UPN5-72

PROC, MANUFA CTURING & DELIVERY CAUSEWAY MATERIAL

86d

30-Nov-16 A

23-Feb-17 A

PROC, MANUFA CTURING & DELIVERY CAUSEWAY MATERIAL

OC00UPN5-67

PROC, MANUFA CTURING & DELIVERY CONCRETE COLLAR

153d

01-Dez-16 A

02-Mai-17 A

0d

07-Feb-16 A

227d

07-Feb-16 A

21-Sep-16 A

72d

07-Feb-16 A

19-Apr-16 A

248d

07-Feb-16 A

11-Okt-16 A

SUMMARY FABRICATIO N & PROCURME NT INLET PIPES LINE - OFFSHORE 524d - TIDEWAY 26-Mrz-16 A

31-Aug-17

293d 0d

PREPARATION BASIC BUILDING DWGS DETAIL DESIGN, CHECKER CONCRETE STRUCTURE START NUMERIC MODELLING PREPARATION BASIC BUILDING DWGS UQB/UPN PREPARTION OF NUMERIC MODELLING STUDY DETAIL DESIGN, CHECKER CONCRETE STRUCTURE UQB/UPN SUMMARY FABRICATIO N & PROCURME NT INLET PIPES LINE - OFFSHORE - TIDEWAY DETAIL DESIGN DRAW INGS - ONSHORE PRELIMINARY STUDIES UP B PRE-ENGINEERING SURVEY UPB SUMMARY ENGINEERING IN LET PIPES LINE - OFFSHORE - TIDEWAY VELOCITY CAP DESIGN ( INCLUDE FOUNDATION) SUMMARY INS TALAION OF ONSHORE PIPE LINES RENT QUAY WALL AND STORAGE AREA AT IDKU ASSIGNING SUB-CONTRACTOR PROC, MANUFA CTURING & DELIVERY HDPE PIPES + ACCESSORIES CIVIL W ORKS COOLING STRUCTURE UQ B/UPN (PUMP AREA)

PROC, MANUFA CTURING & DELIVERY CONCRETE COLLAR


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

Layout Name : EG1019_Level2 Dur.

Start

Finish

25-Dez-16 A

04-Jan-17 A

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 22 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 CIVIL W ORKS COOLING STRUCTURE UQ B/UPN (REMAINING AREA)

OC00UQB5E15#2

CIVIL W ORKS COOLING STRUCTURE UQ B/UPN (REMAINING AREA) 11d

OC00UPN5-68

PROC, MANUFA CTURING & DELIVERY MANHOLE + SPOOL PIECE + CHLORINATION 87d 25-Dez-16 PIPE A MATERIA 21-Mrz-17 LS A

OC00UQR5-94

INSTALLING SCOUR PROTECTION AT OUTFALL PIPELINE EXIT

13d

10-Feb-17 A

23-Feb-17 A

OC00UQR5-93

DRIDGING WORKS AT OUTFALL PIPELINE DISCHARGE

19d

24-Feb-17 A

15-Mrz-17 A

OC00UPN2-43

MINE SCAN (BY ARMY)

70d

04-Mrz-17 A

12-Mai-17 A

OC00UPN2-88

INSTALLATION DESIGN

247d

06-Mrz-17 A

07-Nov-17

OC00UPN5-56

HDPE PIPES & CONCRETE COLLARS INSTALLATION AT HARBO UR 139d

06-Mrz-17 A

22-Jul-17 A

OC00UPN5-64

MOBILIZATION OF ONSHORE EQUIPMENT

14d

01-Apr-17 A

15-Apr-17 A

OC00UPN5-81

COFFERDAM INSTALLATION (SHEET PILES & CAUSEWAY)

97d

12-Apr-17 A

18-Jul-17 A

OC00UPC5-52

PROC, MANUFA CTURING & DELIVERY INTAK E STRUCTURES (V ELOCITY 83dCAP) 10-Mai-17 A

31-Jul-17

OC00UPN2-89

SOIL INVESTIGATION WORKS A ND RE PORT

90d

13-Mai-17 A

10-Aug-17

OC00UPN5-57

MANHOLES INSTALLATION AT HARBOUR

32d

15-Jul-17 A

15-Aug-17

OC00UPN5-73

PROC. & DELIVERY SCOUR P ROTECTION MATERIAL ( VELO CITY CAP & 42d DISCHARGE) 21-Jul-17 A

31-Aug-17

PROC. & DELIVERY SCOUR P ROTECTION MATERIAL ( VELO CITY CAP & DISCHARGE)

OC00UPN5-70

PROC. & DELIVERY ENGINEE RED BACKFILL MATERIAL

21-Jul-17 A

31-Aug-17

PROC. & DELIVERY ENGINEE RED BACKFILL MATERIAL

OC00UPN5-74

PROC. & DELIVERY ROCKS FO R FOUNDATION (VELOCITY CAP & DISCHA 42dRGE) 21-Jul-17 A

31-Aug-17

OC00UPN5-59

CHLORINATION PIPELINES INSTALLATION

15d

05-Aug-17*

19-Aug-17

OC00UPN5-53

MOBILIZATION OF MARINE EQUIPMENT

20d

19-Okt-17

07-Nov-17

OC00UPN5-82

DREDGING INTAKE PIPLINES TRENCH

15d

08-Nov-17

22-Nov-17

OC00UPN5-101

DREDGING INTAKE STRUCTURE FOUNDATION

7d

23-Nov-17

29-Nov-17

DREDGING INTAKE STRUCTURE FOUNDATION

OC00UPC5-48

INTAKE STRUCTURE (VELOCITY CAP) FOUNDATIONS INSTALLATION 1ST 5dPIPELINE 23-Nov-17

27-Nov-17

INTAKE STRUCTURE (VELOCITY CAP) FOUNDATIONS INSTALLATION 1ST PIPELINE

OC00UPC5-62

INTAKE STRUCTURE (VELOCITY CAP) FOUNDATIONS INSTALLATION 2ND 5d PIPELINE 28-Nov-17

02-Dez-17

OC00UPN5-58

HDPE ASSEMBLY TO FULL STRINGS AT HARBOUR

OC00UPN5-102

INTAKE STRUCTURE FOUNDATION GRAVEL DUMPING

42d

PROC, MANUFACTURING & DELIVERY MANHOLE + SPOOL PIECE + CHLORINATION PIPE MATERIALS INSTALLING SCOUR PROTECTION AT OUTFALL PIPELINE EXIT DRIDGING WORKS AT OUTFALL PIPELINE DISCHARGE MINE SCAN (BY ARMY) INSTALLATION DESIGN HDPE PIPES & CONCRETE COLLARS INSTALLATION AT HARBO UR MOBILIZATION OF ONSHORE EQUIPMENT COFFERDAM INSTALLATION (SHEET PILES & CAUSEWAY) PROC, MANUFA CTURING & DELIVERY INTAK E STRUCTURES (V ELOCITY CAP) SOIL INVESTIGATION WORKS A ND RE PORT MANHOLES INSTALLATION AT HARBOUR

PROC. & DELIVERY ROCKS FO R FOUNDATION (VELOCITY CAP & DISCHA RGE) CHLORINATION PIPELINES INSTALLATION MOBILIZATION OF MARINE EQUIPMENT DREDGING INTAKE PIPLINES TRENCH

INTAKE STRUCTURE (VELOCITY CAP) FOUNDATIONS INSTALLATION 2ND PIPELINE HDPE ASSEMBLY TO FULL STRINGS AT HARBOUR

15d

29-Nov-17

13-Dez-17

7d

30-Nov-17

06-Dez-17

INTAKE STRUCTURE FOUNDATION GRAVEL DUMPING

OC00UPC5-50

INTAKE STRUCTURE INSTALLATION (VELOCITY CAP LOWER 2 PIECES)2d 1ST PIPELINE 03-Dez-17

04-Dez-17

INTAKE STRUCTURE INSTALLATION (VELOCITY CAP LOWER 2 PIECES) 1ST PIPELINE

OC00UPC5-63

INTAKE STRUCTURE INSTALLATION (VELOCITY CAP LOWER 2 PIECES)2d 2ND PIPELINE 05-Dez-17

06-Dez-17

INTAKE STRUCTURE INSTALLATION (VELOCITY CAP LOWER 2 PIECES) 2ND PIPELINE

OC00UPN5-103

INTAKE STRUCTURE FOUNDATIONS LEVELLING

7d

07-Dez-17

13-Dez-17

INTAKE STRUCTURE FOUNDATIONS LEVELLING

OC00UPN5-87

1ST INTAKE PIPELINE INSTA LLATION

4d

14-Dez-17

17-Dez-17

1ST INTAKE PIPELINE INSTA LLATION

OC00UPC5-51

INTAKE STRUCTURE INSTALLATION (VELOCITY CAP UPPER 2 PIECES)2d 1ST PIPE 18-Dez-17 LINE

19-Dez-17

INTAKE STRUCTURE INSTALLATION (VELOCITY CAP UPPER 2 PIECES) 1ST PIPE LINE

OC00UPN5-88

2ND INTAKE PIPELINE INSTALLATION

4d

18-Dez-17

21-Dez-17

2ND INTAKE PIPELINE INSTALLATION

OC00UPN5-89

1ST PIPELINE SPOOL PIECE INSTALLATION

4d

18-Dez-17

21-Dez-17

1ST PIPELINE SPOOL PIECE INSTALLATION

OC00UPN5-90

2ND PIPELINE SPOOL PIECE INSTALLATION

4d

22-Dez-17

25-Dez-17

OC00UPN5-91

TEST 1ST INTAKE PIPELINE

5d

22-Dez-17

26-Dez-17

TEST 1ST INTAKE PIPELINE

OC00UPC5-64

INTAKE STRUCTURE INSTALLATION (VELOCITY CAP UPPER 2 PIECES)2d 2ND PIPELINE 22-Dez-17

23-Dez-17

INTAKE STRUCTURE INSTALLATION (VELOCITY CAP UPPER 2 PIECES) 2ND PIPELINE

OC00UPN5-92

TEST 2ND INTAKE PIPELINE

5d

26-Dez-17

30-Dez-17

OC00UPN5-83

BACKFILLING OF INTAKE TRENCH

25d

31-Dez-17

24-Jan-18

BACKFILLING OF INTAKE TRENCH

OC00UPC5-46

SCOUR PROTECTION & ROCKS FRO VELOCITY CAP)

10d

15-Jan-18

24-Jan-18

SCOUR PROTECTION & ROCKS FRO VELOCITY CAP)

OC00UPN5-96

WATER IN PUMP HOUSE FOR LINE 1

0d

24-Jan-18

WATER IN PUMP HOUSE FOR LINE 1

OC00UPN5-97

WATER IN PUMP HOUSE FOR LINE 2

0d

24-Jan-18

WATER IN PUMP HOUSE FOR LINE 2

OC00UPN5-100

DEMOBILIZATION OF MARINE EQUIPMENT

20d

25-Jan-18

13-Feb-18

OC00UPN5-84

COFFERDAM REMOVAL

60d

25-Jan-18

25-Mrz-18

COFFERDAM REMOVAL

OC00UPN5-98

SITE REINSTATMENT

20d

26-Mrz-18

14-Apr-18

SITE REINSTATMENT

OC00UPN5-99

DEMOBILIZAITON OF ONSHORE EQUIPMENT

10d

15-Apr-18

24-Apr-18

210d

19-Dez-15 A

16-Jul-16 A

210d

19-Dez-15 A

16-Jul-16 A

210d

19-Dez-15 A

16-Jul-16 A

11d

19-Dez-15 A

30-Dez-15 A

130d

03-Jan-16 A

12-Mai-16 A

69d

08-Mai-16 A

16-Jul-16 A

299d

15-Aug-16 A

10-Jun-17 A

299d

15-Aug-16 A

10-Jun-17 A

299d

15-Aug-16 A

10-Jun-17 A

STRUCTURE FOR COOLING WATER DISCHARGE UQM General GENERAL OC00UQM2-76

PREPARATION BASIC BUILDING DWGS UQM

OC00UQM2-79

DETAIL DESIGN, CHECKER CONCRETE STRUCTURE UQM

OC00UQM5-52

CONSTRUCTION WORKS UQM

Building for Service Water Outfall S tructure UQR General GENERAL OC00UQR2-81

PREPARATION BASIC BUILDING DWGS

16d

15-Aug-16 A

31-Aug-16 A

OC00UQR2-83

DETAIL DESIGN, CHECKER CONCRETE STRUCTURE

71d

31-Aug-16 A

10-Nov-16 A

OC00UQR5-55

CONCRETE CONSTRUCTION WORKS

51d

20-Apr-17 A

10-Jun-17 A

52d

10-Okt-16 A

30-Nov-16 A

52d

10-Okt-16 A

30-Nov-16 A

52d

10-Okt-16 A

30-Nov-16 A

52d

10-Okt-16 A

30-Nov-16 A

1082d

29-Sep-15 A

14-Sep-18

947d

11-Feb-16 A

14-Sep-18

947d

11-Feb-16 A

14-Sep-18

SI40PAD3-10

DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 40PAD 244d

11-Feb-16 A

11-Okt-16 A

OC40URA5-15#

CIVIL W ORKS COOLING TOWER STRUCTURE URA

328d

04-Aug-16 A

27-Jun-17 A

OC40URA5-10

(H) START PLACING FORMWORK URA

0d

10-Aug-16 A

SI40PAD4-25

TRANSPORT STRUCTURES, FILLS, PIPING ETC. 40PAD INDIA - SITE

45d

12-Okt-16 A

25-Nov-16 A

OC40PAD6-15#

ERECTION FILLS / MECHANICAL EQUIPMENT 40PAD

344d

10-Feb-17 A

19-Jan-18

OC40PAD7F19

ERECTION SCAFFOLDING 40PAD

130d

01-Mrz-17 A

08-Jul-17 A

OC40PAC6B15

ERECTION PAC-PUMPS

42d

12-Aug-17*

22-Sep-17

OC40PAD7F15

E- AND I&C ERE CTION 20PAD

56d

25-Nov-17

19-Jan-18

OC40PAD8-45

FILLING OF COOLING WATER BASIN

7d

08-Sep-18

14-Sep-18

972d

25-Dez-15 A

22-Aug-18

972d

25-Dez-15 A

22-Aug-18

Building for Circulating Cooling Water Pump UQB General COMMON OC00UPN2-44

DESIGN FOR PRE-CAST COLLAR

Wet Cell Cooling Tower PAD Block 4 UNIT 40

Block 3 UNIT 30

2ND PIPELINE SPOOL PIECE INSTALLATION

TEST 2ND INTAKE PIPELINE

DEMOBILIZATION OF MARINE EQUIPMENT

DEMOBILIZAITON OF ONSHORE EQUIPMENT

PREPARATION BASIC BUILDING DWGS UQM DETAIL DESIGN, CHECKER CONCRETE STRUCTURE UQM CONSTRUCTION WORKS UQM

PREPARATION BASIC BUILDING DWGS DETAIL DESIGN, CHECKER CONCRETE STRUCTURE CONCRETE CONSTRUCTION WORKS

DESIGN FOR PRE-CAST COLLAR

DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 40PAD CIVIL W ORKS COOLING TOWER STRUCTURE URA (H) START PLACING FORMWORK URA TRANSPORT STRUCTURES, FILLS, PIPING ETC. 40PAD INDIA - SITE ERECTION FILLS / MECHANICAL EQUIPMENT 40PAD ERECTION SCAFFOLDING 40PAD ERECTION PAC-PUMPS E- AND I&C ERE CTION 20PAD FILLING OF COOLING WATER BASIN


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

Layout Name : EG1019_Level2 Dur.

Start

Finish

25-Aug-16 A

SI30PAD3-10

DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 30PAD 245d

25-Dez-15 A

OC30URA5-10

(H) START PLACING FORMWORK URA

0d

17-Jul-16 A

OC30URA5-15#

CIVIL W ORKS COOLING TOWER STRUCTURE URA

270d

17-Jul-16 A

13-Apr-17 A

SI30PAD4-25

TRANSPORT STRUCTURES, FILLS, PIPING ETC. 30PAD INDIA - SITE

81d

30-Aug-16 A

18-Nov-16 A

OC30PAD6-15#

ERECTION FILLS / MECHANICAL EQUIPMENT 30PAD

337d

12-Jan-17 A

14-Dez-17

OC30PAD7F18

ERECTION SCAFFOLDING 30PAD

123d

14-Jan-17 A

17-Mai-17 A

OC30PAC6B15

ERECTION PAC-PUMPS

42d

10-Aug-17*

20-Sep-17

OC30PAD7F15

E- AND I&C ERE CTION 30PAD

56d

20-Okt-17

14-Dez-17

OC30PAD8-45

FILLING OF COOLING WATER BASIN

7d

16-Aug-18

22-Aug-18

940d

12-Nov-15 A

08-Jun-18

Block 2 UNIT 20

DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 30PAD (H) START PLACING FORMWORK URA

940d

12-Nov-15 A

08-Jun-18

SI20PAD3-10

DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 20PAD 245d

12-Nov-15 A

13-Jul-16 A

OC20URA5-10

(H) START PLACING FORMWORK URA

0d

26-Mai-16 A

OC20URA5-15#

CIVIL W ORKS COOLING TOWER STRUCTURE URA

262d

26-Mai-16 A

12-Feb-17 A

SI20PAD4-25

TRANSPORT STRUCTURES, FILLS, PIPING ETC. 20PAD INDIA - SITE 195d

14-Jul-16 A

24-Jan-17 A

OC20PAD6-15#

ERECTION FILLS / MECHANICAL EQUIPMENT 20PAD

398d

04-Okt-16 A

05-Nov-17

OC20PAD7F17

ERECTION SCAFFOLDING 20PAD

163d

15-Okt-16 A

26-Mrz-17 A

OC20PAC6B15

ERECTION PAC-PUMPS

60d

15-Jun-17 A

13-Aug-17

OC20PAD7F15

E- AND I&C ERE CTION 20PAD

56d

01-Aug-17*

25-Sep-17

OC20PAD8-45

FILLING OF COOLING WATER BASIN

7d

02-Jun-18

08-Jun-18

958d

29-Sep-15 A

13-Mai-18

Block 1 UNIT 10

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 23 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

CIVIL W ORKS COOLING TOWER STRUCTURE URA TRANSPORT STRUCTURES, FILLS, PIPING ETC. 30PAD INDIA - SITE ERECTION FILLS / MECHANICAL EQUIPMENT 30PAD ERECTION SCAFFOLDING 30PAD ERECTION PAC-PUMPS E- AND I&C ERE CTION 30PAD FILLING OF COOLING WATER BASIN

DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 20PAD (H) START PLACING FORMWORK URA CIVIL W ORKS COOLING TOWER STRUCTURE URA TRANSPORT STRUCTURES, FILLS, PIPING ETC. 20PAD INDIA - SITE ERECTION FILLS / MECHANICAL EQUIPMENT 20PAD ERECTION SCAFFOLDING 20PAD ERECTION PAC-PUMPS E- AND I&C ERE CTION 20PAD FILLING OF COOLING WATER BASIN

958d

29-Sep-15 A

13-Mai-18

SI10PAD3-10

DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 10PAD 243d

29-Sep-15 A

28-Mai-16 A

OC10URA5-00

PILING URA + TESTING

59d

02-Mrz-16 A

30-Apr-16 A

OC10URA5-10

(H) START PLACING FORMWORK URA

0d

20-Mai-16 A

OC10URA5-15#

CIVIL W ORKS COOLING TOWER STRUCTURE URA

264d

20-Mai-16 A

07-Feb-17 A

CIVIL W ORKS COOLING TOWER STRUCTURE URA

OC10PAD7F16

ERECTION SCAFFOLDING 10PAD

201d

25-Aug-16 A

13-Mrz-17 A

ERECTION SCAFFOLDING 10PAD

OC10PAD6-15#

SUMMARY ERECTION FILLS / MECHANICA L EQUIPMENT 10PAD

345d

10-Okt-16 A

19-Sep-17

OC10PAC6B15

ERECTION PAC-PUMPS

138d

14-Mrz-17 A

29-Jul-17

OC10PAD7F15

E- AND I&C ERE CTION 10PAD

50d

02-Jul-17 A

20-Aug-17

OC10PAD8-46

TEMPORARY SOURCE AVAILABLE FOR FILLING COOLING WATER BASIN 0d

15-Aug-17*

OC10PAD8-45

FILLING OF COOLING WATER BASIN

07-Mai-18

13-Mai-18 09-Mrz-18

665d

14-Mai-16 A

09-Mrz-18

665d

14-Mai-16 A

09-Mrz-18

SI40PAC3B25

DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC345d

14-Mai-16 A

24-Apr-17 A

SI40PAC4B25

TRANSPORT CIRC. CW PUMP PAC NSP-SITE

28d

25-Apr-17 A

22-Mai-17 A

SI40PAB8-25

COLD COMMISSIONING CIRCULATING WATER SYSTEM 40PAB

49d

20-Jan-18

09-Mrz-18

689d

15-Mrz-16 A

01-Feb-18

Block 3 UNIT 30

689d

15-Mrz-16 A

01-Feb-18

SI30PAC3B25

DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC422d

15-Mrz-16 A

10-Mai-17 A

SI30PAC4B25

TRANSPORT CIRC. CW PUMP PAC NSP-SITE

25d

11-Apr-17 A

06-Mai-17 A

SI30PAB8-25

COLD COMMISSIONING CIRCULATING WATER SYSTEM 30PAB

49d

15-Dez-17

01-Feb-18

707d

15-Jan-16 A

21-Dez-17

Block 2 UNIT 20

707d

15-Jan-16 A

21-Dez-17

SI20PAC3B25

DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC433d

15-Jan-16 A

22-Mrz-17 A

SI20PAC4B25

TRANSPORT CIRC. CW PUMP PAC NSP-SITE

29d

13-Mrz-17 A

10-Apr-17 A

SI20PAB825

COLD COMMISSIONING CIRCULATING WATER SYSTEM 20PAB

49d

03-Nov-17

21-Dez-17

707d

16-Nov-15 A

22-Okt-17

Block 1 UNIT 10

SUMMARY ERECTION FILLS / MECHANICA L EQUIPMENT 10PAD ERECTION PAC-PUMPS E- AND I&C ERE CTION 10PAD TEMPORARY SOURCE AVAILABLE FOR FILLING COOLING WATER BASIN

16-Nov-15 A

Block 4 UNIT 40

7d

PILING URA + TESTING (H) START PLACING FORMWORK URA

845d

Circulating Water Pumps PAC

DETAIL DESIGN, MANUFACTURING CO OLING TOWER EQUIPMENT 10PAD

FILLING OF COOLING WATER BASIN

DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC TRANSPORT CIRC. CW PUMP PAC NSP-SITE COLD COMMISSIONING CIRCULATING WATER SYSTEM 40PAB

DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC TRANSPORT CIRC. CW PUMP PAC NSP-SITE COLD COMMISSIONING CIRCULATING WATER SYSTEM 30PAB

DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC TRANSPORT CIRC. CW PUMP PAC NSP-SITE COLD COMMISSIONING CIRCULATING WATER SYSTEM 20PAB

707d

16-Nov-15 A

22-Okt-17

SI10PAC3B25

DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC442d

16-Nov-15 A

30-Jan-17 A

SI10PAC4B25

TRANSPORT CIRC. CW PUMP PAC NSP-SITE

27d

31-Jan-17 A

27-Feb-17 A

SI10PAB88B25

COLD COMMISSIONING CIRCULATING WATER SYSTEM 10PAB

49d

04-Sep-17

22-Okt-17

639d

16-Feb-16 A

15-Nov-17

21d

30-Apr-16 A

21-Mai-16 A

21d

30-Apr-16 A

21-Mai-16 A

21d

30-Apr-16 A

21-Mai-16 A

21d

30-Apr-16 A

21-Mai-16 A

639d

16-Feb-16 A

15-Nov-17

639d

16-Feb-16 A

15-Nov-17

639d

16-Feb-16 A

15-Nov-17

OC00GC-3-25

DESIGN, MANUFACTURING, S HOP TEST DEMINERALIZATION SYSTEM 227d GC

16-Feb-16 A

30-Sep-16 A

OC00UGD5-15#

SUMMARY FOUNDATION INCL. EXCAVATION UGD

65d

24-Mai-16 A

28-Jul-16 A

OC00UGD5D15#

SUMMARY STEEL , CLADDING , FINISHING WORKS STRUCTURE UGD153d

20-Sep-16 A

20-Feb-17 A

OC00GC-6-15

ERECTION INTERCONNECTING PIPING DEMINERALISATION SYSTEM211d GC

27-Okt-16 A

25-Mai-17 A

OC00GC-6-56

ERECTION INTERCONNECTING PIPING SEA WATER PRE TREATMENT 187d SYS TEM 27-Okt-16 GC A

01-Mai-17 A

OC00GC-6-58

ERECTION INTERCONNECTING PIPING DESALINATION SYSTEM GC 74d

05-Jan-17 A

20-Mrz-17 A

OC00GC-6-66

ERECTION INTERCONNECTING PIPING SEWAGE TREATMENT SYS TEM 112d G C 10-Jan-17 A

01-Mai-17 A

OC00GC-6-60

ERECTION INTERCONNECTING PIPING WASTE WATER TREATMENT 197d SYSTE M 26-Jan-17 GC A

10-Aug-17

ERECTION INTERCONNECTING PIPING WASTE WATER TREATMENT SYSTE M G C

OC00GC-6-62

ERECTION INTERCONNECTING PIPING OIL WATER SEPARATION SYSTEM 197d GC 26-Jan-17 A

10-Aug-17

ERECTION INTERCONNECTING PIPING OIL WATER SEPARATION SYSTEM GC

OC00GC-6-64

ERECTION INTERCONNECTING PIPING POTABLE WATER TREATMENT 185d SYSTEM 07-Feb-17 GC A

10-Aug-17

OC00GC-8-56

DEMIN. WATER AVAILABLE TEMPERORY (FOR PRESSURE TES T)

01-Jul-17 A

OC00GC-8-25#

COLD COMMISSIONING DEMINERALIZATION PLANT GC

WATER TREATMENT / WASTE WATER TREATMENT Piling Water Treatment Area General COMMON OC00UGD5-00

PILING UGD + TESTING

Demineralization Plant GCGeneral COMMON

0d 87d

21-Aug-17

15-Nov-17

DETAIL DESIGN, MANUFACTURING , SHOP TEST CIRC. CW PUMP PAC TRANSPORT CIRC. CW PUMP PAC NSP-SITE COLD COMMISSIONING CIRCULATING WATER SYSTEM 10PAB

PILING UGD + TESTING

DESIGN, MANUFACTURING, S HOP TEST DEMINERALIZATION SYSTEM GC SUMMARY FOUNDATION INCL. EXCAVATION UGD SUMMARY STEEL , CLADDING , FINISHING WORKS STRUCTURE UGD ERECTION INTERCONNECTING PIPING DEMINERALISATION SYSTEM GC ERECTION INTERCONNECTING PIPING SEA WATER PRE TREATMENT SYSTEM GC ERECTION INTERCONNECTING PIPING DESALINATION SYSTEM GC ERECTION INTERCONNECTING PIPING SEWAGE TREATMENT SYSTEM G C

ERECTION INTERCONNECTING PIPING POTABLE WATER TREATMENT SYSTEM GC DEMIN. WATER AVAILABLE TEMPERORY (FOR PRESSURE TEST) COLD COMMISSIONING DEMINERALIZATION PLANT GC


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

OC00GC-8-50

Activity Name

DEMIN. WATER AVAILABLE (FOR PRESSURE TEST)

Compressor Air Station SCA General COMMON

Layout Name : EG1019_Level2 Dur.

Start

Finish

255d

19-Aug-16 A

30-Apr-17 A

255d

19-Aug-16 A

30-Apr-17 A

255d

19-Aug-16 A

30-Apr-17 A

6d

19-Aug-16 A

25-Aug-16 A

0d

25-Sep-17

OC00USC5-4

PILING WORKS AIR COMPRES SOR BUILDING 00USC

OC00USC5-1

FOUNDATION FOR AIR COMPRESSOR BUILDING 00USC

20d

22-Sep-16 A

11-Okt-16 A

OC00USC5-2

CIVIL W ORK FOR AIR COMPRESSOR BUILDING 00USC

47d

24-Sep-16 A

09-Nov-16 A

OC00SCB5-3

ARCH & E/M WORKS 00USC

142d

10-Dez-16 A

30-Apr-17 A

815d

18-Jun-15 A

09-Sep-17

815d

18-Jun-15 A

09-Sep-17

163d

12-Jul-16 A

21-Dez-16 A

163d

12-Jul-16 A

21-Dez-16 A

0d

12-Jul-16 A

41d

15-Jul-16 A

FUEL GAS SUPPLY AREA Fuel Gas Compressor Station EKH General COMMON

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 24 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 DEMIN. WATER AVAILABLE (FOR PRESSURE TEST)

PILING WORKS AIR COMPRESSOR BUILDING 00USC FOUNDATION FOR AIR COMPRESSOR BUILDING 00USC CIVIL W ORK FOR AIR COMPRESSOR BUILDING 00USC ARCH & E/M WORKS 00USC

OC00UEN5-10

(H) START PLACING FORMWORK 00UEN04

OC00UEN5-15

CONSTRUCTION FOUNDATION 00UEN04

OC00EKH6-17

ERECTION PIPES / VALVES WORKS FOR COMPRESSOR STATIO N EKG 127dALL17-Aug-16 UNITS (ZONE2) A 21-Dez-16 A

OC00EK-6-15

ERECTION GAS RECEIVING STATION 00EK

OC00EKH6-16

ERECTION COMPRESSOR STATION 00EKH FOR COMPRESSOR, AUXILARIES 99d 09-Sep-16 AND HEATER A 16-Dez-16 A

ERECTION COMPRESSOR STATION 00EKH FOR COMPRESSOR, AUXILARIES AND HEATER

OC00EKH6-19

ERECTION COMPRESSOR STATION 00EKH FOR ENCLOSURE

ERECTION COMPRESSOR STATION 00EKH FOR ENCLOSURE

Block 4 UNIT 4-

82d

25-Aug-16 A

(H) START PLACING FORMWORK 00UEN04 25-Aug-16 A

CONSTRUCTION FOUNDATION 00UEN04 ERECTION PIPES / VALVES WORKS FOR COMPRESSOR STATIO N EKG ALL UNITS (ZONE2)

15-Nov-16 A

65d

16-Okt-16 A

19-Dez-16 A

556d

18-Jun-15 A

25-Dez-16 A 25-Dez-16 A

ERECTION GAS RECEIVING STATION 00EK

556d

18-Jun-15 A

SI4-EKH3-81

DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 40EKH 313d

18-Jun-15 A

25-Apr-16 A

SI4-EKH4-41

TRANSPORT COMPRESSO R S TATION 40EKH NSP - SITE

106d

26-Apr-16 A

09-Aug-16 A

OC4-EKH6-43

ERECTION FILTER/E-HEATER40

110d

29-Aug-16 A

16-Dez-16 A

OC4-EKH6-16

ERECTION COMPRESSOR STATION 40EKH

101d

29-Aug-16 A

07-Dez-16 A

ERECTION COMPRESSOR STATION 40EKH

OC4-EKH7-15

ELECTRICAL ERECTION COMPRESSO R S TATION 40EKH

36d

01-Nov-16 A

07-Dez-16 A

ELECTRICAL ERECTION COMPRESSO R S TATION 40EKH

SI4-EKH8-25

COLD COMMISSIONING GAS COMPRESSOR STATION 40EKH/00EKH 16d

09-Dez-16 A

24-Dez-16 A

SI4-EKH8-26

GAS COMPRESSOR BYPASS READY FOR GAS ADMISSION - 1ST IGNITIO 0dN 42 /41 (COMP RESSO 25-Dez-16 R BY PASS) A

DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 40EKH TRANSPORT COMPRESSO R S TATION 40EKH NSP - SITE ERECTION FILTER/E-HEATER40

COLD COMMISSIONING GAS COMPRESSOR STATION 40EKH/00EKH GAS COMPRESSOR BYPASS READY FOR GAS ADMISSION - 1ST IGNITIO N 42/41 (COMP RESSO R BY PASS)

611d

18-Jun-15 A

17-Feb-17 A

611d

18-Jun-15 A

17-Feb-17 A

SI3-EKH3-81

DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 30EKH 349d

18-Jun-15 A

31-Mai-16 A

SI3-EKH4-41

TRANSPORT COMPRESSO R S TATION 30EKH NSP - SITE

56d

01-Jun-16 A

27-Jul-16 A

OC3-EKH6-43

ERECTION COMPRESSOR STATION 30EKH

98d

10-Sep-16 A

16-Dez-16 A

ERECTION COMPRESSOR STATION 30EKH

OC3-EKH6-42

ERECTION FILTER/E-HEATER30

91d

17-Sep-16 A

16-Dez-16 A

ERECTION FILTER/E-HEATER30

OC3-EKH7-15

ELECTRICAL ERECTION COMPRESSO R S TATION 30EKH

54d

01-Nov-16 A

24-Dez-16 A

OC3-EKH6-16

ERECTION COMPRESSOR STATION AUXILIARIES (GAS & OIL COOLER 104d ) & ENCLOSURE 06-Nov-16 A30EKH 17-Feb-17 A

SI3-EKH8-25

COLD COMMISSIONING GAS COMPRESSOR STATION 30EKH

SI3-EKH8-26

GAS COMPRESSOR BYPASS READY FOR GAS ADMISSION - 1ST IGNITIO 0dN 32 /31 (COMP RESSO 19-Jan-17 R BY PASS) A

Block 3 UNIT 3-

14d

09-Dez-16 A

18-Jun-15 A

705d

18-Jun-15 A

22-Mai-17 A

SI2-EKH3-81

DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 20EKH 361d

18-Jun-15 A

12-Jun-16 A

SI2-EKH4-41

TRANSPORT COMPRESSO R S TATION 20EKH NSP - SITE

78d

13-Jun-16 A

29-Aug-16 A

OC2-EKH6-43

ERECTION COMPRESSOR STATION 20EKH

75d

13-Sep-16 A

27-Nov-16 A

OC2-EKH7-15

ELECTRICAL ERECTION COMPRESSO R S TATION 20EKH

185d

12-Okt-16 A

15-Apr-17 A

OC2-EKH6-16

ERECTION COMPRESSOR STATION AUXILIARIES (GAS & OIL COOLER 190d ) & ENCLOSURE 06-Nov-16 A20EKH 14-Mai-17 A

OC2-EKH6-42

ERECTION FILTER/E-HEATER20

SI2-EKH8-25

COLD COMMISSIONING GAS COMPRESSOR STATION 20EKH

Block 1 UNIT 1-

6d

TRANSPORT COMPRESSO R STATION 30EKH NSP - SITE

ELECTRICAL ERECTION COMPRESSO R STATION 30EKH ERECTION COMPRESSOR STATION AUXILIARIES (GAS & OIL COOLER ) & ENCLOSURE 30EKH

22-Dez-16 A

705d

Block 2 UNIT 2-

DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 30EKH

COLD COMMISSIONING GAS COMPRESSOR STATION 30EKH GAS COMPRESSOR BYPASS READY FOR GAS ADMISSION - 1ST IGNITIO N 32 /31 (COMP RESSO R BY PASS)

22-Mai-17 A

01-Dez-16 A

07-Dez-16 A

9d

14-Mai-17 A

22-Mai-17 A

815d

18-Jun-15 A

09-Sep-17

DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 20EKH TRANSPORT COMPRESSO R S TATION 20EKH NSP - SITE ERECTION COMPRESSOR STATION 20EKH ELECTRICAL ERECTION COMPRESSO R S TATION 20EKH ERECTION COMPRESSOR STATION AUXILIARIES (GAS & OIL COOLER ) & ENCLOSURE 20EKH ERECTION FILTER/E-HEATER20 COLD COMMISSIONING GAS COMPRESSOR STATION 20EKH

815d

18-Jun-15 A

09-Sep-17

SI1-EKH3-81

DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 10EKH 538d

18-Jun-15 A

07-Dez-16 A

SI1-EKH4-41

TRANSPORT COMPRESSO R S TATION 10EKH NSP - SITE

55d

08-Dez-16 A

31-Jan-17 A

OC1-EKH6-43

ERECTION COMPRESSOR STATION 10EKH

121d

14-Feb-17 A

14-Jun-17 A

OC1-EKH6-16

ERECTION COMPRESSOR STATION AUXILIARIES (GAS & OIL COOLER36d ) & ENCLOSURE 14-Feb-17 A10EKH 22-Mrz-17 A

OC1-EKH6-42

ERECTION FILTER/E-HEATER10

17d

01-Mrz-17 A

18-Mrz-17 A

OC1-EKH7-15

ELECTRICAL ERECTION COMPRESSO R S TATION 10EKH

64d

05-Mrz-17 A

07-Mai-17 A

SI1-EKH8-25

COLD COMMISSIONING GAS COMPRESSOR STATION 10EKH

26d

15-Aug-17

09-Sep-17

COLD COMMISSIONING GAS COMPRESSOR STATION 10EKH

IS1-EKH8-25

#INTERFACE# COLD COMMIS SIONING GA S COMPRE SSOR STATION 10EKH 0d

09-Sep-17

#INTERFACE# COLD COMMISSIONING GAS COMPRESSOR STATION 10EKH

CONTROL ROOM BUILDING Concrete / Formwork / Reinforcement UCA General COMMON

946d

16-Nov-15 A

18-Jun-18

370d

16-Nov-15 A

19-Nov-16 A

370d

16-Nov-15 A

19-Nov-16 A

370d

16-Nov-15 A

19-Nov-16 A

17d

16-Nov-15 A

02-Dez-15 A

DETAIL DESIGN, MANUFA CTURING COMP RESSO R STATION 10EKH TRANSPORT COMPRESSO R S TATION 10EKH NSP - SITE ERECTION COMPRESSOR STATION 10EKH ERECTION COMPRESSOR STATION AUXILIARIES (GAS & OIL COOLER ) & ENCLOSURE 10EKH ERECTION FILTER/E-HEATER10 ELECTRICAL ERECTION COMPRESSO R S TATION 10EKH

OC00UCA5-00

PILING UCA/UYC + TESTING

OC00UCA5-15#

CONSTRUCTION OF CONTROL ROOM UCA/UYC

235d

19-Dez-15 A

10-Aug-16 A

CONSTRUCTION OF CONTROL ROOM UCA/UYC

OC00UCA7-15

ERECTION CONTROL ROOM EQUIPMENT UCA

118d

15-Jul-16 A

10-Nov-16 A

ERECTION CONTROL ROOM EQUIPMENT UCA

SI00CR-8-25

COMMISSIONING CONTROL ROOM EQUIPMENT

7d

13-Nov-16 A

19-Nov-16 A

774d

06-Mai-16 A

18-Jun-18

774d

06-Mai-16 A

18-Jun-18

774d

06-Mai-16 A

18-Jun-18

35d

06-Mai-16 A

10-Jun-16 A

732d

17-Jun-16 A

18-Jun-18

85d

27-Jul-16 A

20-Okt-16 A

85d

27-Jul-16 A

20-Okt-16 A

85d

27-Jul-16 A

20-Okt-16 A

Concrete / Formwork / Reinforcement UST General COMMON OC00UST5-00

PILING UST + TESTING

OC00UST5-15#

CONSTRUCTION BUILDING UST

PCC 00UBA9410 General COMMON

PILING UCA/UYC + TESTING

COMMISSIONING CONTROL ROOM EQUIPMENT

PILING UST + TESTING CONSTRUCTION BUILDING UST


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

Layout Name : EG1019_Level2 Dur.

Start

Finish

OC00UBA5-49

(H) START PLACING FORMWORK 00UBA9410/9510/9710

0d

27-Jul-16 A

OC00UBA5-50

FOUNDATION 00UBA9410/9510/9710 (INCL. UBZ OPENING)

11d

27-Jul-16 A

07-Aug-16 A

OC00UBA7G15

ERECTION PCC 00UBA9410/9510/9710 (INCL. INTERNAL CABLING)

42d

08-Sep-16 A

20-Okt-16 A

396d

07-Okt-15 A

05-Nov-16 A

355d

07-Okt-15 A

25-Sep-16 A

355d

07-Okt-15 A

25-Sep-16 A

355d

07-Okt-15 A

25-Sep-16 A

SWITCHYARD Building for Grid Systems Switchgear UAB General COMMON

(H) START PLACING FORMWORK 00UBA9410/9510/9710

OC00UAB5-001

PILING 00UAB + TESTING

39d

07-Okt-15 A

15-Nov-15 A

OC00UAC5-16

PILING 00UAC + TESTING

46d

12-Okt-15 A

27-Nov-15 A

OC00UAB5-10

CONSTRUCTION WORKS 00UAB

332d

30-Okt-15 A

25-Sep-16 A

OC00UAB5-15

(RFE) BUILDING 00UAB

0d

21-Apr-16 A

349d

23-Nov-15 A

05-Nov-16 A

349d

23-Nov-15 A

05-Nov-16 A

349d

23-Nov-15 A

05-Nov-16 A

349d

23-Nov-15 A

05-Nov-16 A

0d

18-Apr-16 A

223d

14-Jan-16 A

24-Aug-16 A

223d

14-Jan-16 A

24-Aug-16 A

223d

14-Jan-16 A

24-Aug-16 A

STRUCTURE FOR GRID SYSTEMS CONTROL BUILDING UAC General COMMON OC00UAC5-17

SUMMARY CONSTRUCTION WORKS 00UAC

OC00UAC5-18

(RFE) BUILDING 00UAC

Concrete / Formwork / Reinforcement UAH General COMMON

165d

14-Jan-16 A

26-Jun-16 A

OC00UAH5-47

CONSTRUCTION FOUNDATION 00UAH01-09

201d

05-Feb-16 A

24-Aug-16 A

208d

06-Apr-16 A

30-Okt-16 A

208d

06-Apr-16 A

30-Okt-16 A

208d

06-Apr-16 A

30-Okt-16 A

208d

06-Apr-16 A

30-Okt-16 A

514d

28-Okt-17

25-Mrz-19

514d 28-Okt-17 Plant Commissioning Combined Cycle / Performance Test & Reliability Run

25-Mrz-19

SI00ABA6-41#

ERECTION SWITCHGEAR ABA LOT1

PLANT COMMISSIONING Block 4 UNIT 40

171d

06-Okt-18

171d

06-Okt-18

25-Mrz-19

30d

06-Okt-18

04-Nov-18 11-Nov-18

#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT40

SI40M--9-55

BYPASS OPERATION FOR ST 40

7d

05-Nov-18

SI40M--9-60

FIRST STEAM ADMISSION TO ST 40

0d

12-Nov-18

SI40MKA9-35

GENERATOR PROTECTION TEST ST 40

3d

12-Nov-18

SI40MKA9-40

1ST. SYNCHRONIZATION ST 40 (TARGE T POWER TO THE GRID)

0d

SI40---9-65

COMBINED CYCLE POWER PLANT LOAD TESTS

64d

15-Nov-18

17-Jan-19

SI40---9-70

OPTIMIZING CCPP BLOCK 40

30d

18-Jan-19

16-Feb-19

SI40---9-80

PERFORMANCE TEST COMBINED CYCLE POWER PLANT

7d

17-Feb-19

23-Feb-19

SI40---9-90

RELIABILITY RUN COMBINED CYCLE POWER PLANT

30d

24-Feb-19

25-Mrz-19

173d

13-Sep-18

04-Mrz-19

SUMMARY CONSTRUCTION WORKS 00UAC

PILING 00UAH + TESTING CONSTRUCTION FOUNDATION 00UAH01-09

ERECTION SWITCHGEAR ABA LOT1

173d

13-Sep-18

04-Mrz-19

33d

13-Sep-18

15-Okt-18 22-Okt-18

#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT40 BYPASS OPERATION FOR ST 40 FIRST STEAM ADMISSION TO ST 40 GENERATOR PROTECTION TEST ST 40

14-Nov-18

1ST. SYNCHRONIZATION ST 40 (TARGET POWER TO THE GRID)

#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT30

SI30M--9-55

BYPASS OPERATION FOR ST 30

7d

16-Okt-18

SI30M--9-60

FIRST STEAM ADMISSION TO ST 30

0d

23-Okt-18

SI30MKA9-35

GENERATOR PROTECTION TEST ST 30

3d

23-Okt-18

SI30MKA9-40

1ST. SYNCHRONIZATION ST 30 (TA RGET POWER TO THE GRID)

0d

SI30---9-65

COMBINED CYCLE POWER PLANT LOAD TESTS

63d

26-Okt-18

27-Dez-18

SI30---9-70

OPTIMIZING CCPP BLOCK 30

30d

28-Dez-18

26-Jan-19

SI30---9-80

PERFORMANCE TEST COMBINED CYCLE POWER PLANT

7d

27-Jan-19

02-Feb-19

SI30---9-90

RELIABILITY RUN COMBINED CYCLE POWER PLANT

30d

03-Feb-19

04-Mrz-19

185d

30-Jun-18

31-Dez-18

185d

30-Jun-18

31-Dez-18

33d

30-Jun-18

01-Aug-18 08-Aug-18

COMBINED CYCLE POWER PLANT LOAD TESTS OPTIMIZING CCPP BLOCK 40 PERFORMANCE TEST COMBINED CYCLE POWER PLANT RELIABILITY RUN COMBINED CYCLE POWER PLANT

#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT30 BYPASS OPERATION FOR ST 30 FIRST STEAM ADMISSION TO ST 30

25-Okt-18

GENERATOR PROTECTION TEST ST 30

25-Okt-18

1ST. SYNCHRONIZATION ST 30 (TA RGET POWER TO THE GRID)

--20---9-50

#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT20

SI20M--9-55

BYPASS OPERATION FOR ST 20

7d

02-Aug-18

SI20M--9-60

FIRST STEAM ADMISSION TO ST 20

0d

09-Aug-18

SI20MKA9-35

GENERATOR PROTECTION TEST ST 20

3d

09-Aug-18

SI20MKA9-40

1ST. SYNCHRONIZATION ST 20 (TA RGET POWER TO THE GRID)

0d

SI20---9-65

COMBINED CYCLE POWER PLANT LOAD TESTS

75d

12-Aug-18

25-Okt-18

SI20---9-70

OPTIMIZING CCPP BLOCK 20

30d

26-Okt-18

24-Nov-18

SI20---9-80

PERFORMANCE TEST COMBINED CYCLE POWER PLANT

7d

25-Nov-18

01-Dez-18

SI20---9-90

RELIABILITY RUN COMBINED CYCLE POWER PLANT

30d

02-Dez-18

31-Dez-18

405d

28-Okt-17

06-Dez-18

405d

28-Okt-17

06-Dez-18

4d

28-Okt-17

31-Okt-17

30d

01-Nov-17

30-Nov-17

0d

01-Dez-17

Block 1 UNIT 10

CONSTRUCTION WORKS 00UAB

14-Nov-18

--30---9-50

Block 2 UNIT 20

PILING 00UAB + TESTING PILING 00UAC + TESTING

25-Mrz-19

--40---9-50

Block 3 UNIT 30

ERECTION PCC 00UBA9410/9510/9710 (INCL. INTERNAL CABLING)

(RFE) BUILDING 00UAC

PILING 00UAH + TESTING

General COMMON

FOUNDATION 00UBA9410/9510/9710 (INCL. UBZ OPENING)

(RFE) BUILDING 00UAB

OC00UAH5-49

GIS Phase 1

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 25 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78

COMBINED CYCLE POWER PLANT LOAD TESTS OPTIMIZING CCPP BLOCK 30 PERFORMANCE TEST COMBINED CYCLE POWER PLANT RELIABILITY RUN COMBINED CYCLE POWER PLANT

#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT20 BYPASS OPERATION FOR ST 20 FIRST STEAM ADMISSION TO ST 20

11-Aug-18

GENERATOR PROTECTION TEST ST 20

11-Aug-18

1ST. SYNCHRONIZATION ST 20 (TA RGET POWER TO THE GRID)

SI10---9-98

PERFORMANCE TEST GT11 / GT12

SI10---9-85

RELIABILITY RUN OPEN CYCLE POWER PLANT UNIT11/12

SI10---9-97

EARLY FINISH DATE G T11 & GT12

--10---9-50

#STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT10

32d

04-Jun-18

05-Jul-18

SI10M--9-55

BYPASS OPERATION FOR ST 10

7d

06-Jul-18

12-Jul-18

SI10M--9-60

FIRST STEAM ADMISSION TO ST 10

0d

13-Jul-18

SI10MKA9-35

GENERATOR PROTECTION TEST ST 10

3d

13-Jul-18

SI10MKA9-40

1ST. SYNCHRONIZATION ST 10 (TA RGET POWER TO THE GRID)

0d

SI10---9-65

COMBINED CYCLE POWER PLANT LOAD TESTS

77d

16-Jul-18

30-Sep-18

SI10---9-70

OPTIMIZING CCPP BLOCK 10

30d

01-Okt-18

30-Okt-18

COMBINED CYCLE POWER PLANT LOAD TESTS OPTIMIZING CCPP BLOCK 20 PERFORMANCE TEST COMBINED CYCLE POWER PLANT RELIABILITY RUN COMBINED CYCLE POWER PLANT

PERFORMANCE TEST GT11 / GT12 RELIABILITY RUN OPEN CYCLE POWER PLANT UNIT11/12 EARLY FINISH DATE G T11 & GT12 #STEAM BLOW INCL. REMOVAL TEMP. PIPES UNIT10 BYPASS OPERATION FOR ST 10 FIRST STEAM ADMISSION TO ST 10

15-Jul-18

GENERATOR PROTECTION TEST ST 10

15-Jul-18

1ST. SYNCHRONIZATION ST 10 (TA RGET POWER TO THE GRID) COMBINED CYCLE POWER PLANT LOAD TESTS OPTIMIZING CCPP BLOCK 10


Project Name: EG1019 - Burullus - Rev. 0U Activity ID

Activity Name

SI10---9-80

PERFORMANCE TEST COMBINED CYCLE POWER PLANT

SI10---9-90

RELIABILITY RUN COMBINED CYCLE POWER PLANT (3x10d)

Layout Name : EG1019_Level2 Dur.

Start

Finish

7d

31-Okt-18

06-Nov-18

30d

07-Nov-18

06-Dez-18

Data Date: 25-Jul-17 - Print Date: 10-Aug-17, 12:26 - User : z003mpyr - Page 26 of 26

2015 2016 2017 2018 2019 2020 2021 S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N -9 -8 -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 1 19 20 2 22 23 24 2 26 27 2 29 30 31 32 3 34 35 3 37 38 39 4 41 42 43 44 4 46 4 48 49 50 51 5 53 54 5 56 5 58 59 60 6 62 63 6 65 66 67 68 6 70 71 72 7 74 75 7 77 78 PERFORMANCE TEST COMBINED CYCLE POWER PLANT RELIABILITY RUN COMBINED CYCLE POWER PLANT (3x10d)


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

A 2. Correspondence status CON

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Project: EG1019 MPR No.: 23

Correspondence List (Customer to Consortium)

SIEMENS Letter-No.(int.)

Letter-No.(ext.)

Subject

Reply Req. Corr. Date

Target Date

2015_22-OC_EEHC-SAG-E-00001 2015_22-OC_EEHC-SAG-E-00002 2015_22-OC_EEHC-SAG-E-00003

2015_22_EEHC_SAG-OC-E-00001 2015_22_EEHC_SAG-OC-E-00002 2015_22_EEHC_SAG-OC-E-00003

Fwd: El Burullus, Beni Suef and New Capital Combined Cycle Power Plants Projects Burullus Project / Egypt 4800 MW Combined Cycle Power Project Re: Burullus: EEHC Letter ref. (2015_22-OC-EEHC-L-00023)

Yes No Yes

04.09.2015 29.10.2015 05.11.2015

11.09.2015 12.11.2015

Completed Completed Completed

2015_22-OC_EEHC-SAG-E-00023 2015_22-OC_EEHC-SAG-E-00026

2015_22_EEHC_SAG-OC-E-00023 2015_22_EEHC_SAG-OC-E-00026

2015-22-SAG-OC-EEHC-L-00029 LAYOUT CHANGE missed E-mails

Yes Yes

17.11.2015 20.10.2015

24.11.2015 27.10.2015

Completed Completed

2015_22-OC_EEHC-SAG-E-00039

2015_22_EEHC_SAG-OC-L-00039

EG1019 CON 2015_22- EEHC_SAG-OC-L-00039 Document transmittals

Yes

21.11.2015

26.11.2015

Completed

2015_22-OC_EEHC-SAG-E-00040 2015_22-OC_EEHC-SAG-E-00050 2015_22-OC_EEHC-SAG-E-00051

2015_22_EEHC_SAG-OC-L-00040 2015_22_EEHC_SAG-OC-L-00050 2015_22_EEHC_SAG-OC-E-00051

Yes Yes Yes

04.12.2015 09.12.2015 12.12.2015

09.12.2015 16.12.2015 18.12.2015

Completed Completed Completed

2015_22-OC_EEHC-SAG-E-00086 2015_22-OC_EEHC-SAG-E-00117

No Yes

24.02.2016 12.03.2016

18.03.2016

Completed Completed

2015_22-OC_EEHC-SAG-E-00119 2015_22-OC_EEHC-SAG-E-00122 2015_22-OC_EEHC-SAG-E-00123

2015_22_EEHC_SAG-OC-L-00086 2015_22_EEHC_SAG-OC-L-00117 2015_22_SAG-OC_EEHC-L-00124 (Part2) 2015_22_EEHC_SAG-OC-L-00144 2015_22_SAG-OC_EEHC-L-00157

AW: Change of rating from 2000 to 3150 A 2015_22- EEHC_SAG-OC -L-00050 Offer of Fuel Oil System the relocation of GIS for Burulls Project Burullus: EEHC Letter ref. (2015_22-SAG-OC_EEHC-L-00086) – "Electrocution Fatality Burullus" 2015_22- EEHC_SAG-OC -L-00117 Border Guards' Approval

No No No

11.03.2016 19.04.2016 15.05.2016

Completed Completed Completed

2015_22-OC_EEHC-SAG-E-00124 2015_22-OC_EEHC-SAG-E-00126

2015_22_EEHC_SAG-OC-L-00156 2015_22_SAG-OC_EEHC-L-00213

No No

13.05.2016 15.08.2016

Completed Completed

2015_22-OC_EEHC-SAG-E-00128 2015_22-OC_EEHC-SAG-E-00129 2015_22-OC_EEHC-SAG-E-00130 2015_22-OC_EEHC-SAG-E-00131

Yes No No No

15.11.2016 16.11.2016 15.12.2016 24.01.2017

No

23.06.2016

Completed

Resend: 2015_22-SAG-OC_EEHC-L-00186 500kV Grid RESEND: 2015_22-SAG-OC_EEHC-L-00234 Alternative Structures for Air Defense Forces Burullus project Executive Order 2015_22-SAG-OC_EEHC-L-00246 - Site Preparation Agreement Quantities

No

20.07.2016

Completed

2015_22-OC_EEHC-SAG-E-00234 2015_22-OC_EEHC-SAG-E-00244 2015_22-OC_EEHC-SAG-E-00246

2015_22_EEHC_SAG-OC-E-00256 2015_22-SAG-OC_EEHC-L-00257 2015_22-SAG-OC_EEHC-L-00274 2015_22-SAG-OC_EEHC-L-00281 2015_22-SAG-OC_EEHC-L00174_RESEND 2015_22-SAG-OC_EEHC-L00186_RESEND 2015_22-SAG-OC_EEHC-L00234_RESEND 2015_22_EEHC_SAG-OC-L-00244 2015_22-SAG-OC_EEHC-L-00246

2015_22-SAG-OC_EEHC-L-00124 Monthly Progress Report No. 6 Part2/2 Re: 2015_22-SAG-OC_EEHC-L-00144 Notice of Force Majeure 2015_22-SAG-OC_EEHC-L-00157 Monthly Progress Report No.8 Part2/2 RE: 2015_22-SAG-OC_EEHC-L-00156 Intake and Discharge Structures - AFOA approval on temporary works 2015_22-SAG-OC_EEHC-L-00213 Monthly Progress Report No. 11 Part 2/2 Re: 2015_22-SAG-OC_EEHC-L-00256 MoM MDEPC-Meeting on site 8th November 2016 2015_22-SAG-OC_EEHC-L-00257 Monthly Progress Report No. 14 Part2/2 2015_22-SAG-OC_EEHC-L-00274 Monthly Progress Report No. 15 Part2/2 2015_22-SAG-OC_EEHC-L-00281 Monthly Progress Report No.16 Part2/2 RESEND: 2015_22-SAG-OC_EEHC-L-00174 Re Burullus/Samanoud 500 KV OHTL Tower

No No No

25.10.2016 27.11.2016 15.02.2017

Completed Completed Completed

2015_22-OC_EEHC-SAG-E-00292 2015_22-OC_EEHC-SAG-E-00293 2015_22-OC_EEHC-SAG-E-00294 2015_22-OC_EEHC-SAG-E-00321 2015_22-OC_EEHC-SAG-E-00334 2015_22-OC_EEHC-SAG-E-00338

2015_22-SAG-OC_EEHC-L-00292_Part2 2015_22-SAG-OC_EEHC-L-00299 2015_22-SAG-OC_EEHC-L-00313 2015_22-SAG-OC_EEHC-L-00321_1 2015_22-SAG-OC_EEHC-L-00334_1 2015_22-SAG-OC_EEHC-L-00338_1

AW: 2015_22-SAG-OC_EEHC-L-00292 Monthly Progress Report No. 17 Part2/2 2015_22-SAG-OC_EEHC-L-00299 Monthly Progress Report No. 18 Part2/2 2015_22-SAG-OC_EEHC-L-00313 Monthly Progress Report No. 19 Part2/2 2015_22-SAG-OC_EEHC-L-00321 Monthly Progress Report No. 20 Part2/2 2015_22-SAG-OC_EEHC-L-00334 Monthly Progress Report No. 21 Part 2/2 RE: 2015_22-SAG-OC_EEHC-L-00338 Monthly Progress Report No. 22 Part2/2

No No No No No No

17.02.2017 18.03.2017 20.04.2017 10.05.2017 15.06.2017 14.07.2017

Completed Completed Completed Completed Completed Completed

2015_22-OC_EEHC-SAG-L-00001 2015_22-OC_EEHC-SAG-L-00002 2015_22-OC_EEHC-SAG-L-00003

2015_22_EEHC_SAG-OC-L-00001 2015_22_EEHC_SAG-OC-L-00002 2015_22_EEHC_SAG-OC-L-00003

2015_22-EEHC_SAG-OH-L-0000l Areas for laydown, Site Offices and Camp 2015-22-EEHC-SAG – OH-L-00002 Temporary Constriction Power EG 1019 CON 2015_22-EEHC_SAG-OH-L-00003 GIS Building Skeleton

No No No

17.09.2015 17.09.2015 17.09.2015

Completed Completed Completed

2015_22-OC_EEHC-SAG-L-00004 2015_22-OC_EEHC-SAG-L-00005 2015_22-OC_EEHC-SAG-L-00006

2015_22_EEHC_SAG-OC-L-00004 2015_22_EEHC_SAG-OC-L-00005 2015_22_EEHC_SAG-OC-L-00006

No No No

23.09.2015 23.09.2015 23.09.2015

Completed Completed Completed

2015_22-OC_EEHC-SAG-L-00007

2015_22_EEHC_SAG-OC-L-00007

No

23.09.2015

Completed

2015_22-OC_EEHC-SAG-L-00008

2015_22_EEHC_SAG-OC-L-00008

Letter 00004 Letter 0005 Letter 0006 WG: EG 1019 CON2015-22_EEHC-SAG – OH-L-00007 Authorized personnel for invoice signature , WG: EG 1019 CON 2015-22_EEHC-SAG – OH-L-00008 Technical Data for Fuel Oil Forwarding Pumps

No

23.09.2015

Completed

2015_22-OC_EEHC-SAG-L-00010

2015_22_EEHC_SAG-OC-L-00010

EG l0l9 CON 2015-22 EEHC-SAG - OH-L-00010 Project's Construction Water

No

29.09.2015

Completed

2015_22-OC_EEHC-SAG-L-00011 2015_22-OC_EEHC-SAG-L-00012

2015_22_EEHC_SAG-OC-L-00011 2015_22_EEHC_SAG-OC-L-00012

No No

29.09.2015 29.09.2015

Completed Completed

2015_22-OC_EEHC-SAG-L-00013

2015_22_EEHC_SAG-OC-L-00013

No

30.09.2015

Completed

2015_22-SAG-OH_EEHC-L-00027

2015_22-OC_EEHC-SAG-L-00014

2015_22_EEHC_SAG-OC-L-00014

EG 1019 CON 20 I 5 22-EEHC_SAG - OH-L-0001 I Temporary Construction power EG 1019 CON 2015 22-EEHC_SAG -OH-L-00012 Civil'ù/orks EG 1019 CON 2015_22-EEHC_SAG – OH-L-00013 Project reference Number at AFOA for EG 1019 CON 2015_22- EEHC_SAG -OH-L-00014 Boring Study Report and Topographic

2015_22-SAG-OH_EEHC-L-00026 2015_22-SAG-OC_EEHC-L-00036; 2015_22-SAG-OH_EEHC-L-00024 2015_22_EEHC_SAG-OC-L-00002; 2015_22_EEHC_SAG-OC-L-00006 2015_22-SAG-OC_EEHC-L-00033

No

01.10.2015

Completed

2015_22-OC_EEHC-SAG-L-00015 2015_22-OC_EEHC-SAG-L-00016

2015_22_EEHC_SAG-OC-L-00015 2015_22_EEHC_SAG-OC-L-00016

Yes Yes

02.10.2015 07.10.2015

09.10.2015 14.10.2015

Completed Completed

2015_22-SAG-OC_EEHC-L-00035 2015_22-SAG-OC_EEHC-L-00029; 2015_22-SAG-OH_EEHC-L-00023

2015_22-OC_EEHC-SAG-L-00017

2015_22_EEHC_SAG-OC-L-00017

Yes

07.10.2015

21.10.2015

Completed

2015_22-OC_EEHC-SAG-L-00018 2015_22-OC_EEHC-SAG-L-00019

2015_22_EEHC_SAG-OC-L-00018 2015_22_EEHC_SAG-OC-L-00019

2015_22- EEHC_SAG -OH-L-00015 Site Handover/Layout Change EG1019 CON 2015_22- EEHC_SAG-OH-L-00016 Re: GIS Building Skeleton EG 1019 CON 2015_22- EEHC_SAG – OH-L-00017 Access and Egress to Power Plant – Existing Highway EG 1019 CON 2015_22-EEHC_SAG – OH-L-00018 Delay in Temporary Construction power EG1019 CON 2015_22- EEHC_SAG-OH-L-00019 GIS Piles Boring

No Yes

06.10.2015 07.10.2015

14.10.2015

Completed Completed

2015_22-OC_EEHC-SAG-E-00174 2015_22-OC_EEHC-SAG-E-00186

10.08.2017

22.11.2016

Due

Status

Completed Completed Completed Completed

Reference to

2015_22-OC_EEHC-L-00023 2015_22-SAG-OC_EEHC-L-00029; 2015_22-SAG-OC_EEHC-L-00062 2015_22-SAG-EEHC-L-00057 2015_22-SAG-OC_EEHC-L-00059; 2015_22-SAG-OC_EEHC-L-00066 2015_22-SAG-OC_EEHC-L-00072; 2015_22-SAG-OC_MDEPC-L-00003 2015_22-SAG-OC_EEHC-L-00060 2015_22-SAG-OC_EEHC-L-00062 2015_22-SAG-OC_EEHC-L-00108

2015_22-SAG-OC_EEHC-L-00213 2015_22-SAG-OC_EEHC-L-00256 2015_22-SAG-OC_EEHC-L-00257 2015_22-SAG-OC_EEHC-L-00281

2015_22-SAG-OC_EEHC-L-00016; 2015_22-SAG-OC_EEHC-L-00041 2015_22-OC_EEHC-L-00010 2015_22-SAG-OC_EEHC-L-00029; 2015_22-SAG-OH_EEHC-L-00018; 2015_22-SAG-OH_EEHC-L-00025 2015_22-OC_EEHC-L-00011 2015_22_EEHC_SAG-OC-L-00002

2015_22-SAG-OC_EEHC-L-00028; 2015_22-SAG-OC_EEHC-L-00038 2015_22_EEHC_SAG-OC-L-00011

Page 1 of 6


Project: EG1019 MPR No.: 23

Correspondence List (Customer to Consortium)

SIEMENS Letter-No.(int.)

Letter-No.(ext.)

2015_22-OC_EEHC-SAG-L-00020 2015_22-OC_EEHC-SAG-L-00021 2015_22-OC_EEHC-SAG-L-00022 2015_22-OC_EEHC-SAG-L-00023 2015_22-OC_EEHC-SAG-L-00024 2015_22-OC_EEHC-SAG-L-00025 2015_22-OC_EEHC-SAG-L-00027 2015_22-OC_EEHC-SAG-L-00028 2015_22-OC_EEHC-SAG-L-00029

2015_22_EEHC_SAG-OC-L-00020 2015_22_EEHC_SAG-OC-L-00021 2015_22_EEHC_SAG-OC-L-00022 2015_22_EEHC_SAG-OC-L-00023 2015_22_EEHC_SAG-OC-L-00024 2015_22_EEHC_SAG-OC-L-00025 2015_22_EEHC_SAG-OC-L-00027 2015_22_EEHC_SAG-OC-L-00028 2015_22_EEHC_SAG-OC-L-00029

2015_22-OC_EEHC-SAG-L-00030 2015_22-OC_EEHC-SAG-L-00031 2015_22-OC_EEHC-SAG-L-00032 2015_22-OC_EEHC-SAG-L-00033

2015_22_EEHC_SAG-OC-L-00030 2015_22_EEHC_SAG-OC-L-00031 2015_22_EEHC_SAG-OC-L-00032 2015_22_EEHC_SAG-OC-L-00033

2015_22-OC_EEHC-SAG-L-00034 2015_22-OC_EEHC-SAG-L-00035 2015_22-OC_EEHC-SAG-L-00036 2015_22-OC_EEHC-SAG-L-00037 2015_22-OC_EEHC-SAG-L-00038 2015_22-OC_EEHC-SAG-L-00040 2015_22-OC_EEHC-SAG-L-00041 2015_22-OC_EEHC-SAG-L-00042 2015_22-OC_EEHC-SAG-L-00043 2015_22-OC_EEHC-SAG-L-00044

2015_22_EEHC_SAG-OC-L-00034 2015_22_EEHC_SAG-OC-L-00035 2015_22_EEHC_SAG-OC-L-00036 2015_22_EEHC_SAG-OC-L-00037 2015_22_EEHC_SAG-OC-L-00038 2015_22_EEHC_SAG-OC-L-00040 2015_22_EEHC_SAG-OC-L-00041 2015_22_EEHC_SAG-OC-L-00042 2015_22_EEHC_SAG-OC-L-00043 2015_22_EEHC_SAG-OC-L-00044

2015_22-OC_EEHC-SAG-L-00045 2015_22-OC_EEHC-SAG-L-00046 2015_22-OC_EEHC-SAG-L-00047

2015_22_EEHC_SAG-OC-L-00045 2015_22_EEHC_SAG-OC-L-00046 2015_22_EEHC_SAG-OC-L-00047

2015_22-OC_EEHC-SAG-L-00048

2015_22_EEHC_SAG-OC-L-00048

2015_22-OC_EEHC-SAG-L-00049

2015_22_EEHC_SAG-OC-L-00049

2015_22-OC_EEHC-SAG-L-00051 2015_22-OC_EEHC-SAG-L-00053

2015_22_EEHC_SAG-OC-L-00051 2015_22_EEHC_SAG-OC-L-00053

2015_22-OC_EEHC-SAG-L-00054

Subject EG 1019 CON 2015_22- EEHC_SAG – OC-L-00020 Permit Applications for Burullus Fisher Port Administration building modification Letter 22- technical data for fuel oil forwarding pumps Letter 23- Correspondences procedure Letter 24,Ultra-Sonic Test for Piles Letter 25,Hold of Camp works 2015_22- EEHC_SAG –OC-L-00026 Intake and discharge pipe lines 2015_22- EEHC _SAG-OC -L-00027 Access and Egress to Power Plant EG 1019 CON 2015_22-EEHC_SAG – OC-L-00029 Works on Camp EG1019 CON 2015_22- EEHC_SAG-OC-L-00030 Nomination of additional cladding supplier 2015_22- EEHC_SAG-OC-L-00031 Civil Work problems on Site EG1019 CON 2015_22- EEHC_SAG-OC -L-00032 MV Cables Routes 2015_22- EEHC_SAG-OC -L-00033 GIS Building Drawings

Reply Req. Corr. Date

Status

Reference to 2015_22-SAG-EEHC-L-00056

23.10.2015 23.10.2015 06.11.2015 06.11.2015 05.11.2015

Completed Completed Completed Completed Completed Completed Completed Completed Completed

01.11.2015 02.11.2015 02.11.2015 07.11.2015

06.11.2015 07.11.2015 03.11.2015 12.11.2015

Completed Completed Completed Completed

Yes No Yes Yes Yes Yes No Yes No No

08.11.2015 16.11.2015 17.11.2015 17.11.2015 21.11.2015 22.11.2015 23.11.2015 05.12.2015 05.12.2015 05.12.2015

13.11.2015

Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed

Yes Yes Yes

06.12.2015 06.12.2015 06.12.2015

16.12.2015 11.12.2015 11.12.2015

No

08.12.2015

No

08.12.2015

Yes No

10.12.2015 14.12.2015

No

15.12.2015

2015_22- EEHC_SAG-OC -L-00055 Offer of Hydrogen generation plant 2015_22- EEHC_SAG-OC-L-00057 Recommended Spare Parts List for BoP 2015_22- EEHC_SAG-OC-L-00058 Data For Auxiliary Systems

Yes Yes Yes

17.12.2015 19.12.2015 05.01.2016

23.12.2015 25.12.2015 08.04.2016

Completed Completed Completed

Yes Yes Yes Yes

20.12.2015 25.12.2015 28.12.2015 28.12.2015

22.12.2015 01.01.2016 04.01.2016 06.01.2016

Completed Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00121; 2015_22-SAG-OC_EEHC-L-00140 2015_22-OC_EEHC-L-00057 2015_22-SAG-OC_EEHC-L-00091 2015_22-SAG-OC_EEHC-L-00075

Yes

29.12.2015

05.01.2016

Completed

2015_22-SAG-OC_EEHC-L-00091

2015_22_EEHC_SAG-OC-L-00064 2015_22_EEHC_SAG-OC-L-00065

2015_22-EEHC_SAG -OC-L-00059 Work Permit for Foreign Manpower 2015_22- EEHC_SAG-OC-L-00060 Cooling Water Pipelines 2015_22- EEHC_SAG-OC -L-00061 Backfilling of Gas Reducing Station 2015_22- EEHC_SAG-OC-L-00062 Detailing Scope for H2 Generation Plant EG1019 CON 2015_22- EEHC_SAG-OC -L-00063 Backfilling of Gas Reducing Station 1 EG1019 CON 2015_22- EEHC_SAG-OC -L-00064 Backfilling of Gas Reducing Station 1 2015_22-EEHC_ SAG-OC-L-00065 Nomination of additional LV Cables Supplier

Yes No

30.12.2015 31.12.2015

06.01.2016

Completed Completed

2015_22-SAG-OC_EEHC-L-00091

2015_22-OC_EEHC-SAG-L-00066 2015_22-OC_EEHC-SAG-L-00067

2015_22_EEHC_SAG-OC-L-00066 2015_22_EEHC_SAG-OC-L-00067

EG1019 CON 2015_22- EEHC_SAG-OC-L-00066 Re- Nomination of Underground Fire Fighting Accessories Suppliers and HDPE Underground Fire Pipes FM200 Suppliers Yes 2015_22- EEHC_SAG-OC-L-00067 Re- Backfilling of Gas Reducing Station No

02.01.2016 03.01.2016

08.01.2016

Completed Completed

2015_22-OC_EEHC-SAG-L-00068 2015_22-OC_EEHC-SAG-L-00069 2015_22-OC_EEHC-SAG-L-00070 2015_22-OC_EEHC-SAG-L-00071 2015_22-OC_EEHC-SAG-L-00072 2015_22-OC_EEHC-SAG-L-00073

2015_22_EEHC_SAG-OC-L-00068 2015_22_EEHC_SAG-OC-L-00069 2015_22_EEHC_SAG-OC-L-00070 2015_22_EEHC_SAG-OC-L-00071 2015_22_EEHC_SAG-OC-L-00072 2015_22_EEHC_SAG-OC-L-00073

EG1019 CON 2015_22- EEHC_SAG-OC-L-00068 Works Required for Gas Reducing 2015_22- EEHC_SAG-OC -L-00069 Meeting about Gas Reducing Station 2015_22- EEHC_SAG-OC-L-00070 Pile Tests for Central Control Building 2015_22- EEHC_SAG-OC-L-00071 Alternatives to Raised Floor 2015_22-EEHC_SAG-OC-L-00072 RE Nomination of Underground Fire Fighting 2015_22- EEHC_SAG-OC-L-00073 Floor and Wall Tiles

No Yes No Yes Yes Yes

05.01.2016 07.01.2016 08.01.2016 11.01.2016 11.01.2016 12.01.2016

2015_22-OC_EEHC-SAG-L-00074

2015_22_EEHC_SAG-OC-L-00074

2015_22- EEHC_SAG-OC-L-00074 Execution of the Gas Reducing Station

No

17.01.2016

2015_22-OC_EEHC-SAG-L-00075 2015_22-OC_EEHC-SAG-L-00076

2015_22_EEHC_SAG-OC-L-00075 2015_22_EEHC_SAG-OC-L-00076

2015_22- EEHC_SAG-OC -L-00075 Water Table Level of the Gas Reducing Station 2015_22- EEHC_SAG-OC-L-00076 RE Nomination of Underground Fire Fighting.

Yes No

15.01.2016 17.01.2016

22.01.2016

Completed Completed

2015_22-OC_EEHC-SAG-L-00077

2015_22_EEHC_SAG-OC-L-00077

2015_22- EEHC_SAG-OC-L-00077 Pile Coordinates for Gas Reducing Station

Yes

19.01.2016

26.01.2016

Completed

2015_22-OC_EEHC-SAG-L-00078 2015_22-OC_EEHC-SAG-L-00079

2015_22_EEHC_SAG-OC-L-00078 2015_22_EEHC_SAG-OC-L-00079

2015_22- EEHC_SAG-OC-L-00078 RE Raised Floor for Central Buildings CON 2015_22- EEHC_SAG-OC-L-00079 Ceramic tiles types and codes

Yes No

20.01.2016 22.01.2016

27.01.2016

Completed Completed

No Yes Yes No Yes Yes Yes Yes Yes

08.10.2015 10.10.2015 11.10.2015 11.10.2015 17.10.2015 17.10.2015 31.10.2015 31.10.2015 31.10.2015

Yes Yes Yes Yes

2015_22_EEHC_SAG-OC-L-00054

EG1019 CON 2015_22- EEHC_SAG-OC-L-00034 Intake and discharge pipe lines. EG1019 CON 2015_22- EEHC_SAG-OC-L-00035 Broken Dowels EG 1019 CON 2015_22- EEHC_SAG- OC-L-00036 RE: Load List for Auxiliaries EG1019 CON 2015_22- EEHC_SAG-OC -L-00037 Layout Change 2015_ 22-EEHC_SAG-OC-L-00038 30 MVA Commissioning Power EG1019 CON 2015_22- EEHC_SAG-OC -L-00040 Temporary RO 2015_22- EEHC_SAG-OC -L-00041 Letter to Minister of Transportation 2015_22- EEHC_SAG-OC-L-00042 Layout Change 2015_22- EEHC_SAG-OC-L-00043 Nomination of additional Cables Suppliers 2015_22- EEHC_SAG-OC-L-00044 Nomination of additional Cable Trays Supplier EG 1019 CON 2015_22- EEHC_SAG-OC-L-00045 Reduction of generators and unit transformers ratings 2015_22- EEHC_SAG-OC-L-00046 Reminder: Broken Dowels 2015_22- EEHC_SAG-OC-L-00047 Tests on Working Piles for GIS Building EG1019 CON 2015_22- EEHC_SAG-OC -L-00048 – Re Contractor RO plant- Rejected Water Line EG1019 CON 2015_22- EEHC_SAG-OC -L-00049 – Re: Access and Egress to Power Plant - Existing Highway EG1019 CON 2015_22- EEHC_SAG-OC -L-00051 – Re: Temporary R.O Plant constructed by the owner (Reject Well) 2015_22- EEHC_SAG-OC-L-00053 Temporary and Permanent Fences 2015_22- EEHC_SAG -OC-L-00054 RE Nomination of additional Cable Trays Supplier and Nomination of additional Cable Supplier.

2015_22-OC_EEHC-SAG-L-00055 2015_22-OC_EEHC-SAG-L-00057 2015_22-OC_EEHC-SAG-L-00058

2015_22_EEHC_SAG-OC-L-00055 2015_22_EEHC_SAG-OC-L-00057 2015_22_EEHC_SAG-OC-L-00058

2015_22-OC_EEHC-SAG-L-00059 2015_22-OC_EEHC-SAG-L-00060 2015_22-OC_EEHC-SAG-L-00061 2015_22-OC_EEHC-SAG-L-00062

2015_22_EEHC_SAG-OC-L-00059 2015_22_EEHC_SAG-OC-L-00060 2015_22_EEHC_SAG-OC-L-00061 2015_22_EEHC_SAG-OC-L-00062

2015_22-OC_EEHC-SAG-L-00063

2015_22_EEHC_SAG-OC-L-00063

2015_22-OC_EEHC-SAG-L-00064 2015_22-OC_EEHC-SAG-L-00065

10.08.2017

Target Date 16.10.2015 15.10.2015

24.11.2015 24.11.2015 26.11.2015 26.11.2015 11.12.2015

Due

2015_22-SAG-OC_EEHC-L-00043 2015_22-SAG-OC_EEHC-L-00031 2015_22-OC_EEHC-L-00018

2015_22-SAG-OC_EEHC-L-00049

2015_22-OC_EEHC-L-00049 2015_22-SAG-OC_EEHC-L-00069 2015_22-SAG-OC_EEHC-L-00062 2015_22-SAG-OC_EEHC-L-00047 2015_22-SAG-OC_EEHC-L-00048 2015_22-SAG-OC_EEHC-L-00062 2015_22-OC_EEHC-L-00042 2015_22-OC_EEHC-L-00043

Completed Completed Completed Completed Completed

17.12.2015

Completed Completed

2015_22-OC_EEHC-L-00039

Completed

18.01.2016 17.01.2016 26.01.2016 17.01.2016

Completed Completed Completed Completed Completed Completed Completed

2015_22_EEHC_SAG-OC-L-00050; 2015_22-SAG-OC_EEHC-L-00075 2015_22-SAG-EEHC-L-00151

2015_22-OC_EEHC-L-00063; 2015_22OC_EEHC-L-00064

2015_22-SAG-OC_EEHC-L-00091 2015_22-SAG-OC_EEHC-L-00083 2015_22-OC_EEHC-L-00070 2015_22-SAG-OC_EEHC-L-00088 2015_22_EEHC_SAG-OC-L-00067; 2015_22-SAG-OC_EEHC-L-00091 2015_22-OC_EEHC-L-00075 2015_22-OC_EEHC-L-00074 2015_22-OC_EEHC-L-00079; 2015_22SAG-OC_EEHC-L-00091 2015_22-SAG-OC_EEHC-L-00083; 2015_22-SAG-OC_EEHC-L-00089

Page 2 of 6


Project: EG1019 MPR No.: 23

Correspondence List (Customer to Consortium)

SIEMENS Letter-No.(int.)

Letter-No.(ext.)

Subject

Reply Req. Corr. Date

Target Date

2015_22-OC_EEHC-SAG-L-00080

2015_22_EEHC_SAG-OC-L-00080

2015_22- EEHC_SAG-OC-L-00080 Re - Preliminary Incident Report

Yes

23.01.2016

29.01.2016

Completed

2015_22-OC_EEHC-SAG-L-00081 2015_22-OC_EEHC-SAG-L-00082 2015_22-OC_EEHC-SAG-L-00084

2015_22_EEHC_SAG-OC-L-00081 2015_22_EEHC_SAG-OC-L-00082 2015_22_EEHC_SAG-OC-L-00084

2015_22- EEHC_SAG-OC-L-00081 Re - Pile Coordinates for Gas Reducing Station. 2015_22- EEHC_SAG-OC-L-00082 Laydown Area CON 2015_22- EEHC_SAG-OC -L-00084 Tiles

Yes No No

24.01.2016 27.01.2016 31.01.2016

29.01.2016

Completed Completed Completed

2015_22-OC_EEHC-SAG-L-00085

2015_22_EEHC_SAG-OC-L-00085

31.01.2016

05.02.2016

Completed

2015_22_EEHC_SAG-OC-L-00086 2015_22_EEHC_SAG-OC-L-00087 2015_22_EEHC_SAG-OC-L-00088

Yes Yes Yes

31.01.2016 31.01.2016 31.01.2016

05.02.2016 06.02.2016 05.02.2016

Completed Completed Completed

2015_22-OC_EEHC-SAG-L-00089

2015_22_EEHC_SAG-OC-L-00089

CON 2015_22- EEHC_SAG-OC -L-00085 Proposal for Fire Fighting Station Building CON 2015_22 – EEHC_SAG-OC-L-000086 Additional Supplier Nomination for " GIS HVAC" CON 2015_22- EEHC_ SAG-OC-L-00087 Raised Flooring Specimen CON 2015_22- EEHC_SAG-OC-L-00088 Western Construction Road CON 2015_22- EEHC_SAG-OC-L-00089 Approval of Egyptian Shore Protection Authority

Yes

2015_22-OC_EEHC-SAG-L-00086 2015_22-OC_EEHC-SAG-L-00087 2015_22-OC_EEHC-SAG-L-00088

Yes

31.01.2016

05.02.2016

Completed

2015_22-OC_EEHC-SAG-L-00090

2015_22_EEHC_SAG-OC-L-00090

2015_22- EEHC_SAG-OC -L-00090 Force Majeure

No

06.02.2016

2015_22-OC_EEHC-SAG-L-00091 2015_22-OC_EEHC-SAG-L-00092

2015_22_EEHC_SAG-OC-L-00091 2015_22_EEHC_SAG-OC-L-00092

2015_22- EEHC_SAG-OC -L-00091 Works in Gas Reducing Station CON 2015_22- EEHC_SAG-OC -L-00092 Coordinates of Laydown Area

Yes Yes

07.02.2016 11.02.2016

12.02.2016 18.02.2016

Completed Completed

2015_22-OC_EEHC-SAG-L-00093 2015_22-OC_EEHC-SAG-L-00094 2015_22-OC_EEHC-SAG-L-00095

2015_22_EEHC_SAG-OC-L-00093 2015_22_EEHC_SAG-OC-L-00094 2015_22_EEHC_SAG-OC-L-00095

CON 2015_22- EEHC_SAG-OC -L-00093 Interface Points in Gas Reducing Station 2015_22- EEHC_SAG-OC -L-00094 EHS Notices (1) 2015_22- EEHC_SAG-OC -L-00095 EHS Notices (2)

Yes Yes Yes

11.02.2016 14.02.2016 14.02.2016

25.02.2016 19.02.2016 19.02.2016

Completed Completed Completed

2015_22-OC_EEHC-SAG-L-00096 2015_22-OC_EEHC-SAG-L-00097

2015_22_EEHC_SAG-OC-L-00096 2015_22_EEHC_SAG-OC-L-00097

Yes Yes

15.02.2016 16.02.2016

22.02.2016 23.02.2016

Completed Completed

2015_22-OC_EEHC-SAG-L-00098 2015_22-OC_EEHC-SAG-L-00099 2015_22-OC_EEHC-SAG-L-00100 2015_22-OC_EEHC-SAG-L-00101

2015_22_EEHC_SAG-OC-L-00098 2015_22_EEHC_SAG-OC-L-00099 2015_22_EEHC_SAG-OC-L-00100 2015_22_EEHC_SAG-OC-L-00101

2015-22- EEHC_SAG-OC -L-00096 Raised Flooring Guarantee 2015-22- EEHC_SAG-OC -L-00097 Fire Fighting Building 2015_22- EEHC_SAG-OC -L-00098 Nomination of additional Low Voltage Cables Supplier _22- EEHC_SAG-OC -L-00099 Nomination of additional I&C Cables Supplier 2015_22- EEHC_SAG-OC -L-00100 Piping Route of Temporary R.O. 2015_22- EEHC_SAG-OC -L-00101 Radiography Documents for Gas Pipe Line

Yes Yes Yes No

16.02.2016 16.02.2016 19.02.2016 21.02.2016

25.02.2016 23.02.2016 16.01.2017

Completed Completed Completed Completed

2015_22-OC_EEHC-L-00089 2015_22-OC_EEHC-L-00088

2015_22-OC_EEHC-SAG-L-00102 2015_22-OC_EEHC-SAG-L-00103 2015_22-OC_EEHC-SAG-L-00104 2015_22-OC_EEHC-SAG-L-00105 2015_22-OC_EEHC-SAG-L-00106

2015_22_EEHC_SAG-OC-L-00102 2015_22_EEHC_SAG-OC-L-00103 2015_22_EEHC_SAG-OC-L-00104 2015_22_EEHC_SAG-OC-L-00105 2015_22_EEHC_SAG-OC-L-00106

No Yes Yes Yes Yes

23.02.2016 23.02.2016 22.02.2016 23.02.2016 27.02.2016

Completed Completed Completed Completed Completed

2015_22-OC_EEHC-L-00085 2015_22-SAG-OC_EEHC-L-00118

2015_22-OC_EEHC-SAG-L-00107 2015_22-OC_EEHC-SAG-L-00108 2015_22-OC_EEHC-SAG-L-00109

2015_22_EEHC_SAG-OC-L-00107 2015_22_EEHC_SAG-OC-L-00108 2015_22_EEHC_SAG-OC-L-00109

2015_22-EEHC_SAG-OC-L-00102 Referenced system for laydown Area coordinates 2015_22- EEHC_SAG-OC -L-00103 Force Majeure 2015_22- EEHC_SAG-OC -L-00104 Provision of IT Facilities 2015_22- EEHC_SAG-OC -L-00105 Re: Raised Flooring Guarantee 2015_22- EEHC_SAG –OC- L- 00106 HSE (3) WG: CON 2015_22- EEHC_SAG –OC- L- 00107 Site Protection Measures against Seawater Inundation 2015_22- EEHC_SAG-OC -L-00108 Roll-Up Door in Warehouse Building 2015_22- EEHC_SAG –OC- L- 00109 Corrective Measures of EHS

Yes No No

29.02.2016 28.02.2016 28.02.2016

07.03.2016

Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00126

2015_22-OC_EEHC-SAG-L-00110

2015_22_EEHC_SAG-OC-L-00110

Yes

29.02.2016

08.03.2016

Completed

2015_22-OC_EEHC-L-00101

2015_22-OC_EEHC-SAG-L-00111

2015_22_EEHC_SAG-OC-L-00111

2015_22- EEHC_SAG-OC -L-00110 Re Nomination of additional ICC Cables Supplier 2015_22- EEHC_SAG-OC -L-00111 Nomination of additional Fire-fighting Pipes Suppliers

No

29.02.2016

Completed

2015_22-OC_EEHC-L-00098

2015_22-OC_EEHC-SAG-L-00112

2015_22_EEHC_SAG-OC-L-00112

2015_22- EEHC_SAG-OC -L-00112 Coordinates and Depth of Temporary R.O. Pipes

Yes

29.02.2016

Completed

2015_22-OC_EEHC-L-00099

2015_22-OC_EEHC-SAG-L-00113

2015_22_EEHC_SAG-OC-L-00113

L-00113 Nomination of additional Standard Carbon steel and St. Steel Pipes Suppliers No

05.03.2016

Completed

2015_22-OC_EEHC-SAG-L-00114 2015_22-OC_EEHC-SAG-L-00115 2015_22-OC_EEHC-SAG-L-00116 2015_22-OC_EEHC-SAG-L-00118

2015_22_EEHC_SAG-OC-L-00114 2015_22_EEHC_SAG-OC-L-00115 2015_22_EEHC_SAG-OC-L-00116 2015_22_EEHC_SAG-OC-L-00118

Yes Yes Yes Yes

06.03.2016 08.03.2016 08.03.2016 12.03.2016

14.03.2016 18.03.2016 18.03.2016 18.03.2016

Completed Completed Completed Completed

2015_22-OC_EEHC-L-00104 2015_22-SAG-OC_EEHC-L-00094; 2015_22-SAG-OC_EEHC-L-00128 2015_22-OC_EEHC-L-00100 2015_22_EEHC_SAG-OC-L-00103

2015_22-OC_EEHC-SAG-L-00119

2015_22_EEHC_SAG-OC-L-00119

Yes

15.03.2016

23.03.2016

Completed

2015_22-OC_EEHC-SAG-L-00120 2015_22-OC_EEHC-SAG-L-00121

2015_22_EEHC_SAG-OC-L-00120 2015_22_EEHC_SAG-OC-L-00121

2015_22- EEHC_SAG-OC-L-00114 EHS (4) 2015_22- EEHC_SAG-OC -L-00115 Power Supply of Water Treatment 2015_22- EEHC_SAG-OC -L-00116 Provisions of Office Facilities 2015_22- EEHC_SAG-OC-L-00118 Re: Western Construction Road 2015_22- EEHC_SAG-OC -L-00119 Re-Site Protection Measures against seawater inundation. 2015_22-EEHC_SAG-OC-L-00120 RE: Nomination of additional Standard Carbon steel and St. Steel Pipes Suppliers. 2015_22- EEHC_SAG-OC-L-00121 Re: Re: Raised Flooring Guarantee

Yes Yes

18.03.2016 18.03.2016

29.03.2016 29.03.2016

Completed Completed

2015_22-OC_EEHC-SAG-L-00122 2015_22-OC_EEHC-SAG-L-00123

2015_22_EEHC_SAG-OC-L-00122 2015_22_EEHC_SAG-OC-L-00123

Yes Yes

21.03.2016 19.03.2016

29.03.2016 29.03.2016

Completed Completed

2015_22-OC_EEHC-SAG-L-00124

2015_22_EEHC_SAG-OC-L-00124

2015_22- EEHC_SAG-OC-L-00122 Weather Conditions 2015_22- EEHC_SAG-OC-L-00123 Unapproved Suppliers 2015_22- EEHC_SAG-OC-L-00124 Nomination of additional Fire-Fighting System Supplier

Yes

21.03.2016

29.03.2016

Completed

2015_22-OC_EEHC-SAG-L-00125

2015_22_EEHC_SAG-OC-L-00125

21.03.2016

29.03.2016

Completed

2015_22_EEHC_SAG-OC-L-00126 2015_22_EEHC_SAG-OC-L-00127 2015_22_EEHC_SAG-OC-L-00128

2015_22-EEHC_SAG-OC-L-00125 Demin.Water System 2015_22- EEHC_SAG-OC-L-00126 Nomination of additional HDPE underground Pipes 2015_22-EEHC_SAG-OC-L-00127 Demin.Water System 2015_22- EEHC_SAG-OC-L-00128 Termination of works in gas reducing station

Yes

2015_22-OC_EEHC-SAG-L-00126 2015_22-OC_EEHC-SAG-L-00127 2015_22-OC_EEHC-SAG-L-00128

Yes Yes Yes

22.03.2016 28.03.2016 29.03.2016

29.03.2016 07.04.2016 07.04.2016

Completed Completed Completed

10.08.2017

Due

Status

Completed

07.03.2016 29.02.2016 07.03.2016 07.03.2016

08.03.2016

Reference to 2015_22-SAG-OC_EEHC-L-00087; 2015_22-SAG-OC_EEHC-L-00090 2015_22-SAG-OC_EEHC-L-00091

2015_22-OC_EEHC-L-00084

2015_22-SAG-OC_EEHC-L-00094; 2015_22-SAG-OC_EEHC-L-00101 2015_22_EEHC_SAG-OC-L-00064; 2015_22-SAG-OC_EEHC-L-00091; 2015_22-SAG-OC_EEHC-L-00119

2015_22-SAG-OC_EEHC-L-00119 2015_22-SAG-OC_EEHC-L-00125 2015_22-SAG-OC_EEHC-L-00125 2015_22_EEHC_SAG-OC-L-00071; 2015_22_EEHC_SAG-OC-L-00078; 2015_22_EEHC_SAG-OC-L-00087; 2015_22-OC_EEHC-L-00090 2015_22-OC_EEHC-L-00091

2015_22-SAG-OC_EEHC-L-00105

2015_22-SAG-OC_EEHC-L-00125

2015_22-OC_EEHC-L-00093 2015_22-OC_EEHC-L-00104; 2015_22OC_EEHC-L-00115 2015_22_EEHC_SAG-OC-L-00105 2015_22-SAG-OC_EEHC-L-00131; 2015_22-SAG-OC_EEHC-L-00134

2015_22-OC_EEHC-L-00113 2015_22-OC_EEHC-L-00110; 2015_22OC_EEHC-L-00152 2015_22-OC_EEHC-L-00116 2015_22-OC_EEHC-L-00117

Page 3 of 6


Project: EG1019 MPR No.: 23

Correspondence List (Customer to Consortium)

SIEMENS Letter-No.(int.)

Letter-No.(ext.)

2015_22-OC_EEHC-SAG-L-00129 2015_22-OC_EEHC-SAG-L-00130 2015_22-OC_EEHC-SAG-L-00131

2015_22_EEHC_SAG-OC-L-00129 2015_22_EEHC_SAG-OC-L-00130 2015_22_EEHC_SAG-OC-L-00131

2015_22-OC_EEHC-SAG-L-00132

2015_22_EEHC_SAG-OC-L-00132

2015_22-OC_EEHC-SAG-L-00133

2015_22_EEHC_SAG-OC-L-00133

2015_22-OC_EEHC-SAG-L-00134

2015_22_EEHC_SAG-OC-L-00134

2015_22-OC_EEHC-SAG-L-00135 2015_22-OC_EEHC-SAG-L-00136 2015_22-OC_EEHC-SAG-L-00137 2015_22-OC_EEHC-SAG-L-00138 2015_22-OC_EEHC-SAG-L-00139

2015_22_EEHC_SAG-OC-L-00135 2015_22_EEHC_SAG-OC-L-00136 2015_22_EEHC_SAG-OC-L-00137 2015_22_EEHC_SAG-OC-L-00138 2015_22_EEHC_SAG-OC-L-00139

2015_22-OC_EEHC-SAG-L-00140

2015_22_EEHC_SAG-OC-L-00140

2015_22-OC_EEHC-SAG-L-00141

2015_22_EEHC_SAG-OC-L-00141

2015_22-OC_EEHC-SAG-L-00142

2015_22_EEHC_SAG-OC-L-00142

2015_22-OC_EEHC-SAG-L-00143 2015_22-OC_EEHC-SAG-L-00144

Subject 2015_22- EEHC_SAG-OC-L-00129 Reminder: Re-Site Protection Measures Against Seawater Inundation. 2015_22- EEHC_SAG-OC-L-00130 Decennial Liability Insurance Certificate 2015_22- EEHC_SAG-OC -L-00131 Extra Works in Gas Reducing Station CON 2015_22- EEHC_SAG-OC-L-00132 RE Nomination of additional Fire Fighting Supplier 2015_22- EEHC_SAG-OC-L-00133 Nomination of additional HDPE underground Pipes Suppliers 2015_22- EEHC_SAG-OC-L-00134 Nomination of additional HDPE underground Pipes Suppliers 2015_22- EEHC_SAG-OC-L-00135 Nomination of additional Standard Carbon Steel and St. Steel suppliers 2015_22- EEHC_SAG-OC -L-00136 Accredited Design of Buildings 2015_22- EEHC_SAG-OC -L-00137 Sufficiency of Site Protection Measures L-00138 Re: Nomination of additional HDPE underground Pipes Suppliers. 2015_22- EEHC_SAG-OC-L-00139 Unapproved Suppliers 2015_22-EEHC_SAG-OC-L-00140 Cooling Water Pipelines-Nomination of additional HDPE underground Pipes Suppliers CON 2015_22-EEHC_SAG-OC- L-00141 RE Nomination of additional standard Carbon Steel and St. Steel

Reply Req. Corr. Date

Target Date

Yes Yes Yes

29.03.2016 29.03.2016 02.04.2016

06.04.2016 06.04.2016 12.04.2016

No

03.04.2016

Yes

03.04.2016

Yes

03.04.2016

Yes Yes Yes Yes Yes

Due

Status Completed Completed Completed

Reference to 2015_22_EEHC_SAG-OC-L-00119; 2015_22_EEHC_SAG-OC-L-00137 2015_22-SAG-OC_EEHC-L-00193

Completed

2015_22-OC_EEHC-L-00121

12.04.2016

Completed

2015_22-OC_EEHC-L-00119

12.04.2016

Completed

2015_22-OC_EEHC-L-00122

03.04.2016 06.04.2016 06.04.2016 06.04.2016 08.04.2016

12.04.2016 18.04.2016 18.04.2016 18.04.2016 18.04.2016

Completed Completed Completed Completed Completed

2015_22-OC_EEHC-L-00124

Yes

13.04.2016

22.04.2016

Completed

2015_22-OC_EEHC-L-00129

Yes

15.04.2016

26.04.2016

Completed

Yes

15.04.2016

26.04.2016

Completed

2015_22-OC_EEHC-L-00132 2015_22-SAG-OC_EEHC-L-00123; 2015_22-SAG-OC_EEHC-L-00151

2015_22_EEHC_SAG-OC-L-00143

CON 2015_22- EEHC_SAG-OC -L-00142 Factory Inspection Test CON 2015_22- EEHC_SAG-OC -L-00143 Obstructions of Construction Power Completion

Yes

16.04.2016

26.04.2016

Completed

2015_22_EEHC_SAG-OC-L-00144

2015_22- EEHC_SAG-OC-L-00144 Nomination of Additional Steel Plates Suppliers

Yes

19.04.2016

29.04.2016

Completed

2015_22-OC_EEHC-SAG-L-00145

2015_22_EEHC_SAG-OC-L-00145

2015_22- EEHC_SAG-OC -L-00145 Selected Factory Tests

Yes

21.04.2016

29.04.2016

Completed

2015_22-OC_EEHC-SAG-L-00146 2015_22-OC_EEHC-SAG-L-00147

2015_22_EEHC_SAG-OC-L-00146 2015_22_EEHC_SAG-OC-L-00147

Yes Yes

25.04.2016 03.05.2016

04.05.2016 10.05.2016

Completed Completed

2015_22-OC_EEHC-SAG-L-00148 2015_22-OC_EEHC-SAG-L-00149 2015_22-OC_EEHC-SAG-L-00150 2015_22-OC_EEHC-SAG-L-00151 2015_22-OC_EEHC-SAG-L-00152

2015_22_EEHC_SAG-OC-L-00148 2015_22_EEHC_SAG-OC-L-00149 2015_22_EEHC_SAG-OC-L-00150 2015_22_EEHC_SAG-OC-L-00151 2015_22_EEHC_SAG-OC-L-00152

No No Yes No No

27.04.2016 30.04.2016 03.05.2016 03.05.2016 05.05.2016

10.05.2016

Completed Completed Completed Completed Completed

2015_22-OC_EEHC-SAG-L-00153

2015_22_EEHC_SAG-OC-L-00153

Yes

06.05.2016

25.05.2016

Completed

2015_22-OC_EEHC-SAG-L-00154

2015_22_EEHC_SAG-OC-L-00154

No

08.05.2016

2015_22-OC_EEHC-SAG-L-00155

2015_22_EEHC_SAG-OC-L-00155

Yes

12.05.2016

2015_22-OC_EEHC-SAG-L-00156

2015_22_EEHC_SAG-OC-L-00156

No

14.05.2016

2015_22-OC_EEHC-SAG-L-00157

2015_22_EEHC_SAG-OC-L-00157

Yes

15.05.2016

2015_22-OC_EEHC-SAG-L-00158 2015_22-OC_EEHC-SAG-L-00159 2015_22-OC_EEHC-SAG-L-00160

2015_22_EEHC_SAG-OC-L-00158 2015_22_EEHC_SAG-OC-L-00159 2015_22_EEHC_SAG-OC-L-00160

Yes Yes Yes

17.05.2016 17.05.2016 21.05.2016

2015_22-OC_EEHC-SAG-L-00161 2015_22-OC_EEHC-SAG-L-00162

2015_22_EEHC_SAG-OC-L-00161 2015_22_EEHC_SAG-OC-L-00162

Yes Yes

2015_22-OC_EEHC-SAG-L-00163 2015_22-OC_EEHC-SAG-L-00164 2015_22-OC_EEHC-SAG-L-00165

2015_22_EEHC_SAG-OC-L-00163 2015_22_EEHC_SAG-OC-L-00164 2015_22_EEHC_SAG-OC-L-00165

2015_22-OC_EEHC-SAG-L-00166 2015_22-OC_EEHC-SAG-L-00167

2015_22_EEHC_SAG-OC-L-00166 2015_22_EEHC_SAG-OC-L-00167

2015_22-OC_EEHC-SAG-L-00168 2015_22-OC_EEHC-SAG-L-00169 2015_22-OC_EEHC-SAG-L-00170

2015_22_EEHC_SAG-OC-L-00168 2015_22_EEHC_SAG-OC-L-00169 2015_22_EEHC_SAG-OC-L-00170

2015_22- EEHC_SAG-OC-L-00163 Delays in Project Time Schedule 2015_22-EEHC_SAG-OC-L-00164 RE: Notice for factory inspection test 2015_22-EEHC_SAG-OC-L-00165 Nomination of Additional Piping Suppliers 2015_22-EEHC_SAG-OC-L-00166 Re Nomination of additional carbon steel and st. steel pipes, valves and fittings supplier 4 2015_22-EEHC_SAG-OC-L-00167 Packing Lists No. 084 & 094 CON 2015_22-EEHC_SAG-OC-L-00168 RE Nomination of additional carbon steel and stainless steel pipes, valves and fittings supplier _22-EEHC_SAG-OC-L-00169 Works in Firefighting Water Tank 2015_22-EEHC_SAG-OC-L-00170 Nomination of Additional Piping Supplier

2015_22-OC_EEHC-SAG-L-00171 2015_22-OC_EEHC-SAG-L-00172

2015_22_EEHC_SAG-OC-L-00171 2015_22_EEHC_SAG-OC-L-00172

2015_22-OC_EEHC-SAG-L-00173 2015_22-OC_EEHC-SAG-L-00174

2015_22_EEHC_SAG-OC-L-00173 2015_22_EEHC_SAG-OC-L-00174

10.08.2017

2015_22-EEHC_SAG-OC-L-00146 Nomination of additional Carbon steel and Stainless steel pipes Supplier 2015_22-EEHC_SAG-OC-L-00147 Discrepancy of Piles in Units 2015_22-EEHC_SAG-OC-L-00148 Nomination of additional Electromechanical Subcontractors 2015_22- EEHC_SAG-OC -L-00149 Re Unapproved Suppliers 2015_22- EEHC_SAG-OC-L-00150 EHS (5) 2015_22- EEHC_SAG-OC-L-00151 Nomination of additional RCCP pipes Supplier 2015_22- EEHC_SAG-OC-L-00152 Approval for additional Laydown Area 2015_22- EEHC_SAG-OC-L-00153 RE Nomination of additional Carbon Steel and Stainless Steel Pipes, Valve and Fittings Supplier 2 2015_22- EEHC_SAG-OC-L-00154 RE Nomination of Additional Steel Structure Supplier

2015_22-OC_EEHC-L-00224 2015_22-OC_EEHC-L-00127 2015_22_EEHC_SAG-OC-L-00123

2015_22-OC_EEHC-L-00131 2015_22-SAG-EEHC-L-00250; 2015_22-SAG-OC_EEHC-L-00123 2015_22_EEHC_SAG-OC-L-00138; 2015_22-OC_EEHC-L-00139; 2015_22OC_EEHC-L-00140

2015_22-OC_EEHC-L-00142 2015_22-OC_EEHC-L-00133 2015_22-SAG-OC_EEHC-L-00173 2015_22-OC_EEHC-L-00145

Completed

2015_22-OC_EEHC-L-00131; 2015_22OC_EEHC-L-00147

Completed

2015_22-SAG-OC_EEHC-L-00155; 2015_22-SAG-OC_EEHC-L-00158

Completed

2015_22-OC_EEHC-L-00150

25.05.2016

Completed

2015_22-OC_EEHC-L-00156

25.05.2016 16.01.2017 01.06.2016

Completed Completed Completed

2015_22-OC_EEHC-L-00157 2015_22-SAG-EEHC-L-00275 2015_22-SAG-EEHC-L-00264

21.05.2016 22.05.2016

01.06.2016 01.06.2016

Completed Completed

2015_22-OC_EEHC-L-00162

Yes No No

23.05.2016 23.05.2016 25.05.2016

01.06.2016

Completed Completed Completed

Yes Yes

27.05.2016 27.05.2016

08.06.2016 08.06.2016

Completed Completed

2015_22-OC_EEHC-L-00174

Yes Yes Yes

29.05.2016 31.05.2016 31.05.2016

08.06.2016 08.06.2016 08.06.2016

Completed Completed Completed

2015_22-EEHC_SAG-OC-L-00171 Corrective Measures of Safety Procedures on Site 2015_22- EEHC_SAG-OC-L-00172 EHS (6)

Yes Yes

31.05.2016 31.05.2016

08.06.2016 08.06.2016

Completed Completed

_22-EEHC_SAG-OC-L-00173 Burullus/ Samanoud 500 KV OHTL Tower 2015_22-EEHC_SAG-OC-L-00174 Nomination of Additional Piping Suppliers

Yes Yes

01.06.2016 03.06.2016

13.06.2016 13.06.2016

Completed Completed

2015_22-OC_EEHC-L-00170 2015_22-OC_EEHC-L-00221 2015_22-OC_EEHC-L-00173 2015_22_EEHC_SAG-OC-L-00109; 2015_22-SAG-OC_EEHC-L-00161; 2015_22-SAG-OC_EEHC-L-00180 2015_22-SAG-OC_EEHC-L-00181 2015_22-SAG-OC_EEHC-L-00163; 2015_22-SAG-OC_EEHC-L-00174 2015_22-OC_EEHC-L-00175

2015_22- EEHC_SAG-OC-L-00155 Crossing of Heavy Shipments underneath the section of High- voltage Overhead Transmission Line (OHTL) running across the Site 2015_22-EEHC_SAG-OC-L-00156 Nomination of additional Standard Carbon Steel and St. Steel Pipes, fitting and valves Supplier 2015_22-EEHC_SAG-OC-L-00157 Re Nomination of additional standard Carbon Steel and St. Steel Pipes, Valve, and Fittings Supplier 3 CON 2015_22-EEHC_SAG-OC-L-00158 Nomination of additional Sump Pumps Suppliers CON 2015_22-EEHC_SAG-OC-L-00159 Steam Turbine Crane 2015_22- EEHC_SAG-OC-L-0160 Lack of Project Documentation CON 2015_22- EEHC_SAG-OC -L-00161 Nomination of additional carbon steel and st. steel pipes, valves and fittings supplier 3 2015_22- EEHC_SAG-OC-L-00162 Alternative Structures for Air Defense Forces

25.05.2016

2015_22-SAG-OC_EEHC-L-00157; 2015_22-SAG-OC_EEHC-L-00177 2015_22-OC_EEHC-L-00167 2015_22-OC_EEHC-L-00165

Page 4 of 6


Project: EG1019 MPR No.: 23

Correspondence List (Customer to Consortium)

SIEMENS Letter-No.(int.)

Letter-No.(ext.)

Subject

2015_22-OC_EEHC-SAG-L-00175

2015_22_EEHC_SAG-OC-L-00175

04.06.2016

13.06.2016

Completed

2015_22-OC_EEHC-SAG-L-00176

2015_22_EEHC_SAG-OC-L-00176

2015_22-EEHC_SAG-OC-L-00175 Nomination of Additional Pump Suppliers Yes 2015_22-EEHC_SAG-OC-L-00176 Shore Protection Approval on Intake and Discharge structures Yes

08.06.2016

16.06.2016

Completed

2015_22-OC_EEHC-SAG-L-00178 2015_22-OC_EEHC-SAG-L-00179

2015_22_EEHC_SAG-OC-L-00178 2015_22_EEHC_SAG-OC-L-00179

_22-EEHC_SAG-OC-L-00178 Nomination of Additional Suppliers of Valves _22-EEHC_SAG-OC-L-00179 Nomination of additional piping suppliers

Yes No

11.06.2016 11.06.2016

20.06.2016

Completed Completed

2015_22-OC_EEHC-SAG-L-00180

2015_22_EEHC_SAG-OC-L-00180

11.06.2016

20.06.2016

Completed

2015_22_EEHC_SAG-OC-L-00181 2015_22_EEHC_SAG-OC-L-00182 2015_22_EEHC_SAG-OC-L-00183

2015_22-EEHC_SAG-OC-L-00180 Nomination of Additional Sump Pumps Supplier. CON 2015_22-EEHC_SAG-OC-L-00181 Site Preparation Agreement Increase of Quantities Interim Assessment 2015_22-EEHC_SAG-OC-L-00182 Invoice documentation 2015_22-EEHC_SAG-OC-L-00183 Data for Supplied Pumps

Yes

2015_22-OC_EEHC-SAG-L-00181 2015_22-OC_EEHC-SAG-L-00182 2015_22-OC_EEHC-SAG-L-00183

Yes Yes Yes

13.06.2016 12.06.2016 15.06.2016

20.06.2016 20.06.2016 22.06.2016

Completed Completed Completed

2015_22-OC_EEHC-SAG-L-00184

2015_22_EEHC_SAG-OC-L-00184

CON 2015_22-EEHC_SAG-OC-L-00184 Support for Contractor’s R.O. Plant Operation No

16.06.2016

2015_22-OC_EEHC-SAG-L-00185 2015_22-OC_EEHC-SAG-L-00186

2015_22_EEHC_SAG-OC-L-00185 2015_22_EEHC_SAG-OC-L-00186

2015_22- EEHC_SAG-OC-L-00185 Re Invoice Documentation 2015_22- EEHC_SAG-OC-L-00186 Re-allocation of Well No.3 Pipeline

Yes Yes

28.06.2016 07.07.2016

06.07.2016 14.07.2016

Completed Completed

2015_22-OC_EEHC-SAG-L-00187

2015_22_EEHC_SAG-OC-L-00187

2015_22- EEHC_SAG-OC-L-00187 Commissioning Power Source

Yes

07.07.2016

18.07.2016

Completed

2015_22-OC_EEHC-SAG-L-00188

2015_22_EEHC_SAG-OC-L-00188

Yes

23.07.2016

01.08.2016

Completed

2015_22-OC_EEHC-SAG-L-00189

2015_22_EEHC_SAG-OC-L-00189

2015_22- EEHC_SAG-OC-L-00188 Re Delays in Project Time 2015_22-EEHC_SAG-OC-L-00189 Re: Agenda for meeting regarding construction of Gas Reducing Station by Owner/GASCO

No

12.08.2016

2015_22-OC_EEHC-SAG-L-00190 2015_22-OC_EEHC-SAG-L-00191 2015_22-OC_EEHC-SAG-L-00192

2015_22_EEHC_SAG-OC-L-00190 2015_22_EEHC_SAG-OC-L-00191 2015_22_EEHC_SAG-OC-L-00192

2015_22-EEHC_SAG-OC-L-00190 Collective Notes 2015_22-EEHC_SAG-OC-L-00191 Drawings for Inhabited Buildings 2015_22- EEHC_SAG-OC-L-00192 Missed Project Schedule

Yes No Yes

12.08.2016 12.08.2016 16.08.2016

22.08.2016 24.08.2016

Completed Completed Completed

2015_22-OC_EEHC-SAG-L-00193

2015_22_EEHC_SAG-OC-L-00193

2015_22-EEHC_SAG-OC-L-00193 Halting Works in Gas Reducing Station

Yes

18.08.2016

26.08.2016

Completed

2015_22-OC_EEHC-SAG-L-00194

2015_22_EEHC_SAG-OC-L-00194

19.08.2016

29.08.2016

Completed

2015_22_EEHC_SAG-OC-L-00195

2015_22-EEHC_SAG-OC-L-00194 Re Commissioning Power Source 2015_22-EEHC_SAG-OC-L-00195 Re: Condition of the temporary Gas Reducing Station

Yes

2015_22-OC_EEHC-SAG-L-00195

Yes

19.08.2016

29.08.2016

Completed

2015_22-OC_EEHC-SAG-L-00196

2015_22_EEHC_SAG-OC-L-00196

2015_22-EEHC_SAG-OC-L-00196 Re Final Site Layout and Security Requirements

Yes

21.08.2016

29.08.2016

Completed

2015_22-OC_EEHC-SAG-L-00197

2015_22_EEHC_SAG-OC-L-00197

2015_22-EEHC_SAG-OC-L-00197 Re Delays in Project Time (2)

Yes

04.09.2016

12.09.2016

Completed

2015_22-OC_EEHC-SAG-L-00198

2015_22_EEHC_SAG-OC-L-00198

2015_22-EEHC_SAG-OC-L-00198 Gas Reducing Station –Interface Point

Yes

04.09.2016

12.09.2016

Completed

2015_22-OC_EEHC-SAG-L-00199

2015_22-EEHC_SAG-OC-L-00199

2015_22-EEHC_SAG-OC-L-00199 Floods in China

Yes

05.09.2016

13.09.2016

Completed

2015_22-OC_EEHC-SAG-L-00200

2015_22_EEHC_SAG-OC-L-00200

2015_22-EEHC_SAG-OC-L-00200 Factory Inspection Test

Yes

06.09.2016

14.09.2016

Completed

2015_22-OC_EEHC-SAG-L-00201 2015_22-OC_EEHC-SAG-L-00202

2015_22_EEHC_SAG-OC-L-00201 2015_22_EEHC_SAG-OC-L-00202

2015_22-EEHC_SAG-OC-L-00201 Re: Offshore Works’ Permits 2015_22-EEHC_SAG-OC-L-00202 Readiness of the Gas Reducing Station

Yes Yes

07.09.2016 06.09.2016

15.09.2016 14.09.2016

Completed Completed

2015_22-OC_EEHC-SAG-L-00203

2015_22_EEHC_SAG-OC-L-00203

2015_22-EEHC_SAG-OC-L-00203 Remarks on Monthly Progress Report No.12

Yes

20.09.2016

29.09.2016

Completed

2015_22-OC_EEHC-SAG-L-00204

2015_22_EEHC_SAG-OC-L-00204

2015_22-EEHC_SAG-OC-L-00204 Re Invoice Documentation (2)

Yes

20.09.2016

29.09.2016

Completed

2015_22-OC_EEHC-SAG-L-00205

2015_22_EEHC_SAG-OC-L-00205

2015_22-EEHC_SAG-OC-L-00205 Interface Point of the Gas Reducing Station

Yes

23.09.2016

03.10.2016

Completed

10.08.2017

Reply Req. Corr. Date

Target Date

Due

Status

Completed

Completed

Reference to 2015_22-OC_EEHC-L-00177; 2015_22OC_EEHC-L-00218 2015_22-SAG-OC_EEHC-L-00166 2015_22-OC_EEHC-L-00184; 2015_22OC_EEHC-L-00198 2015_22-OC_EEHC-L-00186 2015_22-OC_EEHC-L-00187; 2015_22OC_EEHC-L-00195 2015_22-SAG-OC_EEHC-L-00162; 2015_22-SAG-OC_EEHC-L-00169 2015_22-SAG-OC_EEHC-L-00168 2015_22-SAG-OC_EEHC-L-00171 2015_22-SAG-OC_EEHC-L-00167 2015_22-SAG-EEHC-L-00303; 2015_22-SAG-OC_EEHC-L-00168; 2015_22-SAG-OC_EEHC-L-00190; 2015_22-SAG-OC_EEHC-L-00195 2015_22-OC_EEHC-L-00220 2015_22-EEHC-SAG-L-00029; 2015_22-SAG-OC_EEHC-L-00175; 2015_22-SAG-OC_EEHC-L-00210 2015_22-SAG-OC_EEHC-L-00177; 2015_22-SAG-OC_EEHC-L-00200 2015_22-SAG-OC_EEHC-L-00211 2015_22-SAG-EEHC-L-00317; 2015_22-SAG-EEHC-L-00318; 2015_22-SAG-EEHC-L-00319; 2015_22-SAG-EEHC-L-00322 2015_22-OC_EEHC-L-00241 2015_22-SAG-OC_EEHC-L-00225 2015_22-SAG-OC_EEHC-L-00215; 2015_22-SAG-OC_EEHC-L-00243 2015_22-EEHC-SAG-L-00029; 2015_22-SAG-OC_EEHC-L-00210; 2015_22-SAG-OC_EEHC-L-00220 2015_22-SAG-OC_EEHC-L-00212; 2015_22-SAG-OC_EEHC-L-00218 2015_22_EEHC_SAG-OC-L-00053; 2015_22_EEHC_SAG-OC-L-00097; 2015_22-EEHC_OC-L-00013; 2015_22SAG-OC_EEHC-L-00184 2015_22-SAG-OC_EEHC-L-00200; 2015_22-SAG-OC_EEHC-L-00226 2015_22_EEHC_SAG-OC-L-00093; 2015_22-SAG-OC_EEHC-L-00202; 2015_22-SAG-OC_EEHC-L-00204 2015_22-SAG-EEHC-L-00328; 2015_22-SAG-OC_EEHC-L-00214 2015_22-SAG-OC_EEHC-L-00142; 2015_22-SAG-OC_EEHC-L-00151 2015_22-SAG-OC_EEHC-L-00162; 2015_22-SAG-OC_EEHC-L-00196; 2015_22-SAG-OC_EEHC-L-00203; 2015_22-SAG-OC_EEHC-L-00206 2015_22-SAG-OC_EEHC-L-00218 2015_22_EEHC_SAG-OC-L-00163; 2015_22_EEHC_SAG-OC-L-00181; 2015_22_EEHC_SAG-OC-L-00188; 2015_22_EEHC_SAG-OC-L-00197; 2015_22-SAG-OC_EEHC-L-00162; 2015_22-SAG-OC_EEHC-L-00209; 2015_22-SAG-OC_EEHC-L-00216; 2015_22-SAG-OC-L-00201 2015_22-SAG-OC_EEHC-L-00195; 2015_22-SAG-OC_EEHC-L-00208 2015_22_EEHC_SAG-OC-L-00093; 2015_22_EEHC_SAG-OC-L-00198; 2015_22-SAG-OC_EEHC-L-00193; 2015_22-SAG-OC_EEHC-L-00204; 2015_22-SAG-OC_EEHC-L-00217; 2015_22-SAG-OC_EEHC-L-00227

Page 5 of 6


Project: EG1019 MPR No.: 23

Correspondence List (Customer to Consortium)

SIEMENS Letter-No.(int.)

Letter-No.(ext.)

Subject

Reply Req. Corr. Date

Target Date

2015_22-OC_EEHC-SAG-L-00206

2015_22_EEHC_SAG-OC-L-00206

2015_22-EEHC_SAG-OC-L-00206 Minutes of Meeting 16August 2016

Yes

23.09.2016

03.10.2016

Completed

2015_22-OC_EEHC-SAG-L-00207 2015_22-OC_EEHC-SAG-L-00208

2015_22_EEHC_SAG-OC-L-00207 2015_22_EEHC_SAG-OC-L-00208

Yes Yes

25.09.2016 27.09.2016

03.10.2016 05.10.2016

Completed Completed

2015_22-OC_EEHC-SAG-L-00209

2015_22_EEHC_SAG-OC-L-00209

2015_22-EEHC_SAG-OC-L-00207 Offshore Mines Scan 2015_22-EEHC_SAG-OC-L-00208 Collective Notes (2) 2015_22-EEHC_SAG-OC-L-00209 Height Restriction for Crossing Underneath of Energized 500kV Overhead Transmission Line (OHTL)

Reference to 2015_22-SAG-OC_EEHC-L-00211; 2015_22-SAG-OC_EEHC-L-00228 2015_22-SAG-OC_EEHC-L-00205; 2015_22-SAG-OC_EEHC-L-00207 2015_22-SAG-OC_EEHC-L-00259

Yes

02.10.2016

11.10.2016

Completed

2015_22-SAG-OC_EEHC-L-00219

2015_22-OC_EEHC-SAG-L-00210

2015_22_EEHC_SAG-OC-L-00210

2015_22-EEHC_SAG-OC-L-00210 Gas pipe line trench in the Gas Reducing Station

Yes

09.10.2016

17.10.2016

Completed

2015_22-OC_EEHC-SAG-L-00211 2015_22-OC_EEHC-SAG-L-00212

2015_22_EEHC_SAG-OC-L-00211 2015_22_EEHC_SAG-OC-L-00212

2015_22-EEHC_SAG-OC-L-00211 Electrical Works Offer for GRS 2015_22-EEHC_SAG-OC-L-00212 Damage of 500kV Cable

Yes Yes

10.10.2016 19.10.2016

18.10.2016 28.10.2016

Completed Completed

2015_22-SAG-OC_EEHC-L-00231 2015_22-SAG-OC_EEHC-L-00217; 2015_22-SAG-OC_EEHC-L-00228; 2015_22-SAG-OC_EEHC-L-00243 2015_22-SAG-OC_EEHC-L-00242

2015_22-OC_EEHC-SAG-L-00213

2015_22_EEHC_SAG-OC-L-00213

2015_22-EEHC_SAG-OC-L-00213 Readiness of the 500 KV Abu Quir/ Badr Circuit

Yes

22.10.2016

31.10.2016

Completed

2015_22-OC_EEHC-SAG-L-00214

2015_22_EEHC_SAG-OC-L-00214

2015_22-EEHC_SAG-OC-L-00214 Date of Back Energization

Yes

23.10.2016

01.11.2016

Completed

2015_22-OC_EEHC-SAG-L-00215 2015_22-OC_EEHC-SAG-L-00216 2015_22-OC_EEHC-SAG-L-00217

2015_22_EEHC_SAG-OC-L-00215 2015_22_EEHC_SAG-OC-L-00216 2015_22_EEHC_SAG-OC-L-00217

2015_22-EEHC_SAG-OC-L-00215 Failure of HI-POT Test on MV Cable 2015_22- EEHC_SAG-OC-L-00216 Back Energization Date 2015_22- EEHC_SAG-OC-L-00217 Commissioning Procedures and Schedule

Yes Yes Yes

29.10.2016 31.10.2016 06.11.2016

08.11.2016 07.11.2016 14.11.2016

Completed Completed Completed

2015_22-OC_EEHC-SAG-L-00218

2015_22_EEHC_SAG-OC-L-00218

2015_22- EEHC_SAG -OC-L-00218 Re Electrical Works Offer for GRS

Yes

06.11.2016

14.11.2016

Completed

2015_22-OC_EEHC-SAG-L-00219

2015_22_EEHC_SAG-OC-L-00219

12.11.2016

21.11.2016

Completed

2015_22_EEHC_SAG-OC-L-00220

2015_22- EEHC_SAG -OC-L-00219 On-Site Tests for MV Cables 2015_22- EEHC_SAG -OC-L-00220 Mine Clearance Certificate for On-Shore Portion of Works

Yes

2015_22-OC_EEHC-SAG-L-00220

Yes

19.11.2016

28.11.2016

Completed

2015_22-OC_EEHC-SAG-L-00221 2015_22-OC_EEHC-SAG-L-00222 2015_22-OC_EEHC-SAG-L-00223 2015_22-OC_EEHC-SAG-L-00224

2015_22_EEHC_SAG-OC-L-00221 2015_22_EEHC_SAG-OC-L-00222 2015_22_EEHC_SAG-OC-L-00223 2015_22_EEHC_SAG-OC-L-00224

Yes No Yes Yes

19.11.2016 01.12.2016 04.12.2016 11.12.2016

28.11.2016 12.12.2016 19.12.2016

Completed Completed Completed Completed

2015_22-OC_EEHC-SAG-L-00225

2015_22_EEHC_SAG-OC-L-00225

2015_22- EEHC_SAG -OC-L-00221 Project Landscape 2015_22- EEHC_SAG -OC-L-00222 Re Natural Gas Analysis EG1019 CON 2015_22-EEHC_SAG-OC-L-00223 Workers in Burullus Project EG1019 CON 2015_22-EEHC_SAG-OC-L-00224 Collective notices (2) 2015_22- EEHC_SAG -OC-L-00225 Time Schedule for First Fire and First power to grid of Units

Yes

12.12.2016

19.12.2016

Completed

2015_22-OC_EEHC-SAG-L-00226

2015_22_EEHC_SAG-OC-L-00226

2015_22- EEHC_SAG -OC-L-00226 Re: Time Schedule for Synchronization of Units

Yes

21.12.2016

28.12.2016

Completed

2015_22-OC_EEHC-SAG-L-00227 2015_22-OC_EEHC-SAG-L-00228 2015_22-OC_EEHC-SAG-L-00229

2015_22_EEHC_SAG-OC-L-00227 2015_22_EEHC_SAG-OC-L-00228 2015_22_EEHC_SAG-OC-L-00229

Yes Yes Yes

26.12.2016 26.12.2016 26.12.2016

03.01.2017 03.01.2017 03.01.2017

Completed Completed Completed

2015_22-OC_EEHC-SAG-L-00230

2015_22_EEHC_SAG-OC-L-00230

Yes

30.12.2016

06.01.2017

Completed

2015_22-OC_EEHC-SAG-L-00231 2015_22-OC_EEHC-SAG-L-00232

2015_22_EEHC_SAG-OC-L-00231 2015_22_EEHC_SAG-OC-L-00232

2015_22- EEHC_SAG -OC-L-00227 Trip Event of the Main Transformer BAT41 2015_22- EEHC_SAG -OC-L-00228 Trip Event of Abu Quir - Burullus Circuit 2015_22- EEHC_SAG -OC-L-00229 Off- Shore Mine Scan. 2015_22- EEHC_SAG -OC-L-00230 Re: Time Schedule for First Fire and First Power to grid of Units 42,41,32,and 31 open cycle (2) 2015_22- EEHC_SAG-OC-L-00231 Delay in Accelerated Project Time Schedule for Units 41, 32, and 31 2015_22- EEHC_SAG-OC-L-00232 Damage in Main Transformer 41BAT

Yes Yes

01.01.2017 03.01.2017

09.01.2017 10.01.2017

Completed Completed

2015_22-OC_EEHC-SAG-L-00233 2015_22-OC_EEHC-SAG-L-00234

2015_22_EEHC_SAG-OC-L-00233 2015_22_EEHC_SAG-OC-L-00234

2015_22- EEHC_SAG-OC-L-00233 RE: 41BAT01 Trip Event Inspection Report 2015_22-EEHC_SAG-OC-L-00234 Trip Event of Main Transformer BAT41

Yes Yes

07.01.2017 14.01.2017

16.01.2017 19.01.2017

Completed Completed

2015_22-OC_EEHC-SAG-L-00235

2015_22_EEHC_SAG-OC-L-00235

16.01.2017

24.01.2017

Completed

2015_22_EEHC_SAG-OC-L-00236 2015_22_EEHC_SAG-OC-L-00237

Yes Yes

04.02.2017 12.02.2017

13.02.2017 20.02.2017

Completed Completed

2015_22-OC_EEHC-SAG-L-00238

2015_22_EEHC_SAG-OC-L-00238

2015_22- EEHC_SAG -OC-L-00235 Workers in Burullus Project (2) 2015_22- EEHC_SAG-OC-L-00236 Re: Request to send a Letter to the Ministry of Transportation- Maritime Transport Sector (MTS) 2015_22- EEHC_SAG -OC-L-00237 Failures in Gas Compressor Systems 2015_22- EEHC_SAG -OC-L-00238 Request to send a Letter to Ministry of Transportation - Maritime Transport Sector (MTS)

Yes

2015_22-OC_EEHC-SAG-L-00236 2015_22-OC_EEHC-SAG-L-00237

2015_22-SAG-OC_EEHC-L-00279; 2015_22-SAG-OC_EEHC-L-00282 2015_22-SAG-OC_EEHC-L-00280 2015_22_EEHC_SAG-OC-L-00223; 2015_22-SAG-OC_EEHC-L-00266 2015_22_EEHC_SAG-OC-L-00238; 2015_22-SAG-OC_EEHC-L-00283 2015_22-SAG-OC_EEHC-L-00295

No

19.02.2017

Completed

2015_22-SAG-OC_EEHC-L-00285

10.08.2017

Due

Status

2015_22-SSM-OCSM_EEHC-L-00005 2015_22_EEHC_SAG-OC-L-00213; 2015_22-SSM-OCSM_EEHC-L-00006 2015_22-SAG-OC_EEHC-L-00255; 2015_22-SAG-OC_EEHC-L-00305 2015_22-SAG-EEHC-L-00349 2015_22-SAG-EEHC-L-00357 2015_22_EEHC_SAG-OC-L-00211; 2015_22-SAG-OC_EEHC-L-00193; 2015_22-SAG-OC_EEHC-L-00217; 2015_22-SAG-OC_EEHC-L-00228; 2015_22-SAG-OC_EEHC-L-00243; 2015_22-SAG-OC_EEHC-L-00245; 2015_22-SAG-OC_EEHC-L-00253 2015_22-SAG-OC_EEHC-L-00255; 2015_22-SAG-OC_EEHC-L-00258; 2015_22-SAG-OC_EEHC-L-00305 2015_22-SAG-OC_EEHC-L-00248 2015_22-OC_EEHC-L-00273; 2015_22OC_EEHC-L-00277 2015_22-SAG-OC_EEHC-L-00260 2015_22-SAG-OC_EEHC-L-00266 2015_22-SAG-OC_EEHC-L-00275 2015_22-SAG-OC_EEHC-L-00276 2015_22_EEHC_SAG-OC-L-00225; 2015_22-SAG-OC_EEHC-L-00276 2015_22-SAG-OC_EEHC-E-00001; 2015_22-SAG-OC_EEHC-L-00277; 2015_22-SAG-OC_EEHC-L-00282 2015_22-SAG-OC_EEHC-L-00270

2015_22-SAG-OC_EEHC-L-00278 2015_22_EEHC_SAG-OC-L-00230; 2015_22-SAG-OC_EEHC-L-00278

Page 6 of 6


Letter-No.(int.) 2015_22-SAG-OH_EEHC-L-00004 2015_22-SAG-OH_EEHC-L-00007 2015_22-SAG-OC_EEHC-L-00008 2015_22-SAG-OH_EEHC-L-00010 2015_22-SAG-OH_EEHC-L-00012 2015_22-SAG-OH_EEHC-L-00015 2015_22-SAG-OC_EEHC-L-00016 2015_22-SAG-OH_EEHC-L-00013 2015_22-SAG-OH_EEHC-L-00014 2015_22-SAG-OH_EEHC-L-00017 2015_22-SAG-OH_EEHC-L-00018 2015_22-SAG-OH_EEHC-L-00023 2015_22-SAG-OH_EEHC-L-00024 2015_22-SAG-OH_EEHC-L-00025 2015_22-SAG-OH_EEHC-L-00027 2015_22-SAG-OC_EEHC-L-00028 2015_22-SAG-OH_EEHC-L-00026 2015_22-SAG-OC_EEHC-L-00030 2015_22-SAG-OC_EEHC-L-00031 2015_22-SAG-OC_EEHC-L-00032 2015_22-SAG-OC_EEHC-L-00033 2015_22-SAG-OC_EEHC-L-00034 2015_22-SAG-OC_EEHC-L-00035 2015_22-SAG-OC_EEHC-L-00036

Project: EG1019

Correspondence List (consortium to Customer)

SIEMENS Letter-No.(ext.)

Subject Advance payment and performance letters of guarantee GIS Building Skeleton

Reply Req. Corr. Date Yes 03.08.2015 Yes 17.08.2015

Target Date 17.08.2015 31.08.2015

Status Completed Completed

EG1019 CON 2015_22-SAG-OH_EEHC-L-00008 Formal Taking Over of Site and Confirmation of Coordinates Issuance of the Environmental and Social Impact Assessment (ESIA) Report Formal Taking Over of Site and Confirmation of Coordinates Outstanding Environmental and Social Impact Assessment for projects Burullus and New Capital EG1019 CON 2015_22-SAG-OH_EEHC-L-00016 Areas for Laydown, Site Offices and Camp Resume Site Activities and Stoppage of the Works Army service road at site Owner representative at site Change of Location of GIS Building Site Handover/ Layout Change Project’s Construction Water Change of Location of GIS Building / Site Handover Project Reference Number at AFOA for Permit Applications for Burullus Fisher Port Access and Egress to Power Plant - Existing Highway Technical Data for Fuel Oil Forwarding Pumps Permit Applications for Burullus Fisher Port Correspondence Procedure Monthly Progress Report No. 1 Civil Works RE: Temporary Construction Power RE_ Boring Study Report and Topographic Survey Report RE_Project’s Construction Water

Yes Yes Yes Yes Yes No No No No Yes Yes Yes Yes Yes No Yes Yes No No No No No

30.08.2015 30.08.2015 09.09.2015 05.09.2015 18.09.2015

Sent Completed Completed Sent Sent Completed Completed Completed Completed Sent Completed Sent Completed Sent Completed Sent Completed Completed Completed Completed Completed Completed

24.08.2015 24.08.2015 02.09.2015 03.09.2015 04.09.2015 06.09.2015 06.09.2015 06.09.2015 12.09.2015 18.09.2015 21.09.2015 23.09.2015 25.09.2015 01.10.2015 02.10.2015 06.10.2015 06.10.2015 08.10.2015 09.10.2015 09.10.2015 12.10.2015 12.10.2015

02.10.2015 28.10.2015 06.10.2015 02.10.2015 08.10.2015 09.10.2015 14.10.2015

2015_22-SAG-OC_EEHC-L-00038 2015_22-SAG-OC_EEHC-L-00039 2015_22-SAG-OC_EEHC-L-00041 2015_22-SAG-OC_EEHC-L-00043 2015_22-SAG-OC_EEHC-L-00042

Re: Access and Egress to Power Plant – Existing Highway Monthly progress meeting 29. October 2015 Compensation for Lost Laydown Areas Interfaces to fuel oil system Dust Control and Chance Find Management Plans

No Yes No No No

15.10.2015 16.10.2015 21.10.2015 21.10.2015 26.10.2015

2015_22-SAG-OC_EEHC-L-00029 2015_22-SAG-OC_EEHC-L-00044 2015_22-SAG-OC_EEHC-L-00046 2015_22-SAG-OC_EEHC-L-00047

Layout Change Contractor temporary measures regarding Project’s Construction Water Notice of Force Majeure Event 11kV Commissionig Power

No No No No

27.10.2015 27.10.2015 27.10.2015 29.10.2015

Completed Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00048 2015_22-SAG-OC_EEHC-L-00050 2015_22-SAG-OC_EEHC-L-00051 2015_22-SAG-OC_EEHC-L-00054 2015_22-SAG-OC_EEHC-L-00055 2015_22-SAG-OC_EEHC-L-00049 2015_22-SAG-OC_EEHC-L-00053 2015_22-SAG-OC_EEHC-L-00057 2015_22-SAG-OC_EEHC-L-00059 2015_22-SAG-OC_EEHC-L-00058

No No No No No Yes No Yes Yes No

29.10.2015 05.11.2015 10.11.2015 11.11.2015 11.11.2015 12.11.2015 12.11.2015 12.11.2015 13.11.2015 16.11.2015

Completed Completed Completed Completed Completed Sent Completed Sent Completed Completed

2015_22-SAG-OC_EEHC-L-00060 2015_22-SAG-OC_EEHC-L-00061

Access and Egress to Power Plant - Proposed Design Traffic Management Plan - Input for ESAP Project Colour Concept Monthly Progress Report No. 2 Notice of Force Majeure Site Handover Re: Load List for Auxiliaries for all units 2015_22-SAG-OC_EEHC-L-00057 500 kv GIS Substation Switchgear & Control Start Date after lapse of 6 months Document Transmittals Monthly Progress Meeting - Request for provision of commercial and technical offer for Fuel Oil Handling System upstream defined 2nd Monthly Progress Meeting - Minutes of Meeting

No No

17.11.2015 18.11.2015

Completed Completed

2015_22-SAG-OC_EEHC-L-00062 2015_22-SAG-OC_EEHC-L-00065 2015_22-SAG-OC_EEHC-L-00066

Layout Change Driven Piles - Steel Pipes Document transmittals

No No No

19.11.2015 24.11.2015 24.11.2015

Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00068

500 kV switchgear, OHL feeder rating, receiving gantry

Yes

26.11.2015

10.12.2015

Sent

2015_22-SAG-OC_EEHC-L-00072 2015_22-SAG-OC_EEHC-L-00073 2015_22-SAG-OC_EEHC-L-00071

2015_22-SAG-OC_EEHC-L-00072 Change in rating from 2000 A to 3150 A for the overhead line Hydrogen generation plant - requirements for H2 cooled generators Monthly Progress Report No. 3

Yes No No

07.12.2015 07.12.2015 10.12.2015

14.12.2015

Sent Completed Completed

10.08.2017

23.10.2015

19.11.2015 19.11.2015 20.11.2015

Completed Sent Completed Completed Completed

Reference to 2015_22-SAG-OC_MDEPC-L-00001

2015_22-SAG-OH_EEHC-L-00015 2015_22-SAG-OH_EEHC-L-00010

2015_22_EEHC_SAG-OC-L-00004 2015_22-SAG-OC_EEHC-L-00080

2015_22-SAG-OC_EEHC-L-00047

2015_22_EEHC_SAG-OC-L-00017; 2015_22-SAG-OC_EEHC-L-00048; 2015_22-SAG-OC_EEHC-L-00080

2015_22_EEHC_SAG-OC-L-00022 2015_22_EEHC_SAG-OC-L-00004; 2015_22_EEHC_SAG-OC-L-00015

2015_22-SAG-OC_EEHC-L-00034 2015_22-SAG-OC_EEHC-L-00038; 2015_22-SAG-OC_EEHC-L-00050; 2015_22-SAG-OC_EEHC-L-00080 2015_22-SAG-OC_EEHC-L-00048

2015_22_EEHC_SAG-OC-L-00029 2015_22-EEHC-SAG-L-00014 2015_22-EEHC-SAG-E-00015

2015_22_EEHC_SAG-OC-E-00023; 2015_22-SAG-OC_EEHC-L-00091 2015_22-SAG-OC_EEHC-L-00091 2015_22_EEHC_SAG-OC-L-00039 2015_22-EEHC-SAG-E-00015; 2015_22-SAG-EEHC-L-00374 2015_22_EEHC_SAG-OC-L-00040; 2015_22-SAG-EEHC-L-00374 2015_22-SAG-OC_EEHC-L-00091

Page 1 of 5


Letter-No.(int.)

Project: EG1019

Correspondence List (consortium to Customer)

SIEMENS Subject

Reply Req. Corr. Date

Target Date

Status

2015_22-SAG-OC_EEHC-L-00069 2015_22-SAG-OC_EEHC-L-00075 2015_22-SAG-OC_EEHC-L-00079

RE: Load List for Auxiliaries Detailing scope for H2 generation plant Baseline Program

No Yes No

22.12.2015 22.12.2015 10.01.2016

04.01.2016

Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00080 2015_22-SAG-OC_EEHC-L-00082 2015_22-SAG-OC_EEHC-L-00083 2015_22-SAG-OC_EEHC-L-00081 2015_22-SAG-OC_EEHC-L-00088 2015_22-SAG-OC_EEHC-L-00089

2015_22-SAG-OC_EEHC-L-00080 Meeting with Traffic Authority MOM Notice of Force Majeure 2015_22-SAG-OC_EEHC-L-00083 RE Raised floor for central buildings Monthly Progress Report No. 4 Re Floor and Wall Tiles Re Raised Floor for Central Buildings

No No No No No No

12.01.2016 14.01.2016 14.01.2016 15.01.2016 21.01.2016 21.01.2016

Completed Completed Completed Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00090 2015_22-SAG-OC_EEHC-L-00078

Preliminary Incident Report R1 4th Monthly Progress Meeting - Minutes of Meeting

No No

26.01.2016 01.02.2016

Completed Completed

2015_22-SAG-OC_EEHC-L-00091 2015_22-SAG-OC_EEHC-L-00094 2015_22-SAG-OC_EEHC-L-00096

2015_22-SAG-OC_EEHC-L-00101 2015_22-SAG-OC_EEHC-L-00097 2015_22-SAG-OC_EEHC-L-00102 2015_22-SAG-OC_EEHC-L-00098 2015_22-SAG-OC_EEHC-L-00100 2015_22-SAG-OC_EEHC-L-00105 2015_22-SAG-OC_EEHC-L-00109 2015_22-SAG-OC_EEHC-L-00110

Letter-No.(ext.)

2015_22-SAG-OC_EEHC-L-00091 Re Gas Reducing Station Notice of Force Majeure Petrojet Safety Hazards

RE Force Majeure Monthly Progress Report No. 5 Environmental, Health and Safety (EHS) Manual Project Management Plan Site HSE Procedures Requirements for Radiography Notice of Force Majeure ESAP item 31, Workers Accomodation

No No No

No No Yes No No No Yes No

02.02.2016 02.02.2016 04.02.2016

09.02.2016 10.02.2016 11.02.2016 15.02.2016 15.02.2016 15.02.2016 19.02.2016 23.02.2016

Completed Completed Completed

18.02.2016

26.02.2016

Completed Completed Sent Completed Completed Completed Sent Completed

2015_22-SAG-OC_EEHC-L-00108 2015_22-SAG-OC_EEHC-L-00111 2015_22-SAG-OC_EEHC-L-00113 2015_22-SAG-OC_EEHC-L-00114 2015_22-SAG-OC_EEHC-L-00115 2015_22-SAG-OC_EEHC-L-00116

Final Incident Report Notice of Force Majeure Final report Groundwater Sustainability and Impact Assessment Weekly Consortium EHS Meeting on Site Notification of accident on site Re Radiography documents of Petrojet-GASCO

No No No No No No

24.02.2016 24.02.2016 24.02.2016 24.02.2016 25.02.2016 25.02.2016

Completed Completed Completed Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00117

Re Incident Report Rev 1

No

29.02.2016

Completed

2015_22-SAG-OC_EEHC-L-00118 2015_22-SAG-OC_EEHC-L-00120

RE Force Majeure Notice of Force Majeure

No No

01.03.2016 03.03.2016

Completed Completed

2015_22-SAG-OC_EEHC-L-00121 2015_22-SAG-OC_EEHC-L-00122 2015_22-SAG-OC_EEHC-L-00124

Work Permit for Foreign Manpower Final Incident Report – Crane Accident Monthly Progress Report No. 6 Part1/2

No No No

07.03.2016 07.03.2016 10.03.2016

Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00125 2015_22-SAG-OC_EEHC-L-00126 2015_22-SAG-OC_EEHC-L-00127 2015_22-SAG-OC_EEHC-L-00128

10.08.2017

Reply to EHS letters from Owner RE Corrective Measures of EHS Submission of Insurance Policy No. 16 100 20010 00935 Reply to Owner's EHS letter 4

No No No No

10.03.2016 10.03.2016 11.03.2016 14.03.2016

Completed Completed Completed Completed

Reference to 2015_22_EEHC_SAG-OC-L-00036; 2015_22-SAG-OC_EEHC-L-00091 2015_22_EEHC_SAG-OC-L-00055 2015_22-SAG-OC_EEHC-L-00091 2015_22-SAG-OC_EEHC-L-00028; 2015_22-SAG-OC_EEHC-L-00038; 2015_22-SAG-OC_EEHC-L-00048 2015_22_EEHC_SAG-OC-L-00071 2015_22_EEHC_SAG-OC-L-00073 2015_22_EEHC_SAG-OC-L-00078 2015_22_EEHC_SAG-OC-L-00080; 2015_22-SAG-OC_EEHC-L-00108 2015_22_EEHC_SAG-OC-L-00061; 2015_22_EEHC_SAG-OC-L-00063; 2015_22_EEHC_SAG-OC-L-00064; 2015_22_EEHC_SAG-OC-L-00069; 2015_22_EEHC_SAG-OC-L-00074; 2015_22_EEHC_SAG-OC-L-00077; 2015_22_EEHC_SAG-OC-L-00081; 2015_22-SAG-OC_EEHC-L-00062; 2015_22-SAG-OC_EEHC-L-00065; 2015_22-SAG-OC_EEHC-L-00069; 2015_22-SAG-OC_EEHC-L-00071; 2015_22-SAG-OC_EEHC-L-00079 2015_22-SAG-OC_EEHC-L-00101 2015_22_EEHC_SAG-OC-L-00090; 2015_22-SAG-OC_EEHC-L-00094; 2015_22-SAG-OC_EEHC-L-00118 2015_22-SAG-OC_EEHC-L-00100 2015_22-SAG-OC_EEHC-L-00102 2015_22-SAG-OC_EEHC-L-00116

2015_22_EEHC_SAG-OC-L-00086; 2015_22-SAG-OC_EEHC-L-00090; 2015_22-SAG-OC_EEHC-L-00117

2015_22-SAG-OC_EEHC-L-00105 2015_22_EEHC_SAG-OC-L-00083; 2015_22-SAG-OC_EEHC-L-00108 2015_22_EEHC_SAG-OC-L-00103; 2015_22-SAG-OC_EEHC-L-00101 2015_22_EEHC_SAG-OC-L-00059; 2015_22-SAG-OC_EEHC-L-00140

2015_22_EEHC_SAG-OC-L-00094; 2015_22_EEHC_SAG-OC-L-00095; 2015_22_EEHC_SAG-OC-L-00106

2015_22_EEHC_SAG-OC-L-00114

Page 2 of 5


Letter-No.(int.) 2015_22-SAG-OC_EEHC-L-00129

Project: EG1019

Correspondence List (consortium to Customer)

SIEMENS Letter-No.(ext.)

Subject Gas Reducing Station - Petrojet Works

Reply Req. Corr. Date No 14.03.2016

Target Date

Status Completed

2015_22-SAG-OC_EEHC-L-00119 2015_22-SAG-OC_EEHC-L-00130 2015_22-SAG-OC_EEHC-L-00131 2015_22-SAG-OC_EEHC-L-00132

Gas Reducing Station U- Turns on the International Coast Road Notice of Force Majeure Notification of Serious Incident

Yes No No No

15.03.2016 15.03.2016 15.03.2016 17.03.2016

21.03.2016

Completed Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00134

RE Weather Conditions

No

29.03.2016

2015_22-SAG-OC_EEHC-L-00135

RESEND: 2015_22-SAG-OC_EEHC-L-00135 Supplement of the Contract Color Scheme of the Power Plant Rev C

Yes

31.03.2016

05.04.2016

Sent

2015_22-SAG-OC_EEHC-L-00123 2015_22-SAG-OC_EEHC-L-00133 2015_22-SAG-OC_EEHC-L-00138 2015_22-SAG-OC_EEHC-L-00139

RESEND: 2015_22-SAG-OC_EEHC-L-00123 Factory Inspection Test Reminder of U- Turns on the International Coast Road 2015_22-SAG-OC_EEHC-L-00138 Contractor’s Environmental, Health and Safety (EHS) Manual Rev C Monthly Progress Report No.7

Yes No Yes No

03.04.2016 04.04.2016 04.04.2016 07.04.2016

09.04.2016

Sent Completed Sent Completed

2015_22-SAG-OC_EEHC-L-00140 2015_22-SAG-OC_EEHC-L-00141 2015_22-SAG-OC_EEHC-L-00142 2015_22-SAG-OC_EEHC-L-00143 2015_22-SAG-OC_EEHC-L-00144 2015_22-SAG-OC_EEHC-L-00150 2015_22-SAG-OC_EEHC-L-00152 2015_22-SAG-OC_EEHC-L-00151 2015_22-SAG-OC_EEHC-L-00153

No No Yes No No No No No No

07.04.2016 11.04.2016 11.04.2016 11.04.2016 19.04.2016 22.04.2016 28.04.2016 29.04.2016 29.04.2016

2015_22-SAG-OC_EEHC-L-00155 2015_22-SAG-OC_EEHC-L-00156 2015_22-SAG-OC_EEHC-L-00157

Work Permit for Foreign Manpower Reminder Gas Reduction Station - Petrojet works. Factory Inspection Test Final Incident Report - Failure of non structural negative shutter wall Notice of Force Majeure Site Preparation Agreement Quantities Aviation warning light system for main and bypass stack Factory Inspection Test 2015_22-SAG-OC_EEHC-L-00153 Milestones Payment Schedule for Orascom Construction Scope Crossing of Heavy Shipments underneath the section of High-voltage Overhead Transmission Line (OHTL) running across the Site. Intake and Discharge Structures - AFOA approval on temporary works Monthly Progress Report No.8 Part1/2

Yes Yes No

11.05.2016 12.05.2016 15.05.2016

2015_22-SAG-OC_EEHC-L-00158 2015_22-SAG-OC_EEHC-L-00159 2015_22-SAG-OC_EEHC-L-00161

Re: Crossing of Heavy Shipments underneath the section of High- voltage Overhead Transmission Line (OHTL) running across the Site Notice of Force Majeure Burullus: EEHC Letter ref. (2015_22-SAG-OC_EEHC-L-00161) –"Fatality on Site"

Yes No No

19.05.2016 25.05.2016 31.05.2016

2015_22-SAG-OC_EEHC-L-00162 2015_22-SAG-OC_EEHC-L-00180 2015_22-SAG-OC_EEHC-L-00181 2015_22-SAG-OC_EEHC-L-00163 2015_22-SAG-OC_EEHC-L-00164 2015_22-SAG-OC_EEHC-L-00170 2015_22-SAG-OC_EEHC-L-00173 2015_22-SAG-OC_EEHC-L-00168 2015_22-SAG-OC_EEHC-L-00171 2015_22-SAG-OC_EEHC-L-00165

Site Preparation Agreement Increase of Quantities Interim Assessment Re Corrective Measures of Safety Procedures on Site Re EHS 6 Re Burullus-Samanoud 500 KV OHTL Tower drm Site Preperation Agreement Completion date. Monthly Progress Report No.9 Re EHS 5 Re Invoice documentation Re: Data for supplied pumps Final Incident Report - Lifting Failure on Module 3

No Yes No Yes Yes No No No No No

02.06.2016 02.06.2016 03.06.2016 06.06.2016 09.06.2016 10.06.2016 13.06.2016 20.06.2016 20.06.2016 21.06.2016

2015_22-SAG-OC_EEHC-L-00174

Re Burullus/Samanoud 500 KV OHTL Tower

Yes

22.06.2016

2015_22-SAG-OC_EEHC-L-00175 2015_22-SAG-OC_EEHC-L-00166 2015_22-SAG-OC_EEHC-L-00167 2015_22-SAG-OC_EEHC-L-00172 2015_22-SAG-OC_EEHC-L-00185

Gantry construction required for the 500kV Burullus/ Samanoid Transmission line Re Shore Protection Approval on Intake an Discharge Structures Re Support for the Contractor´s RO Plant Operation Rescheduling of Monthly Progress Report No. 10 Draft Workforce Code of Conduct and the Commitment

No Yes Yes No No

22.06.2016 28.06.2016 28.06.2016 28.06.2016 04.07.2016

2015_22-SAG-OC_EEHC-L-00169 2015_22-SAG-OC_EEHC-L-00176 2015_22-SAG-OC_EEHC-L-00177 2015_22-SAG-OC_EEHC-L-00178 2015_22-SAG-OC_EEHC-L-00179 2015_22-SAG-OC_EEHC-L-00076

Site Preparation Agreement Quantities Water Quality of the Site 2015_22-SAG-OC_EEHC-L-00177 Re Delays in Project Time Reminder - Shore Protection Approval on Intake and Discharge Structures Re Schedule of GIS works Social Insurance Authority Notification

No Yes Yes Yes No Yes

13.07.2016 15.07.2016 15.07.2016 15.07.2016 15.07.2016 18.07.2016

10.08.2017

Completed

09.04.2016

18.04.2016

12.05.2016 17.05.2016

26.05.2016

10.06.2016 13.06.2016 16.06.2016

29.06.2016

05.07.2016 05.07.2016

22.07.2016 22.07.2016 22.07.2016 25.07.2016

Completed Completed Sent Completed Completed Completed Completed Completed Completed Sent Sent Completed

Completed Completed Completed

Completed Sent Completed Sent Sent Completed Completed Completed Completed Completed Sent Completed Sent Sent Completed Completed Completed Sent Sent Sent Completed Sent

Reference to 2015_22_EEHC_SAG-OC-L-00091; 2015_22_EEHC_SAG-OC-L-00093 2015_22-SAG-OC_EEHC-L-00133 2015_22-SAG-OC_EEHC-L-00134 2015_22_EEHC_SAG-OC-L-00122; 2015_22-SAG-OC_EEHC-L-00131 2015_22-OC-SAG-L-00095 2015_22-SAG-EEHC-L-00206; 2015_22-SAG-OC_EEHC-L-00142 2015_22-SAG-OC_EEHC-L-00130

2015_22_EEHC_SAG-OC-L-00059; 2015_22-SAG-OC_EEHC-L-00121 2015_22-SAG-OC_EEHC-L-00123

2015_22-SAG-EEHC-L-00218 2015_22_EEHC_SAG-OC-L-00142

2015_22-SAG-OC_EEHC-L-00182 2015_22_EEHC_SAG-OC-L-00155; 2015_22-SAG-OC_EEHC-L-00219; 2015_22-SAG-OC_EEHC-L-00244

2015_22-SAG-OC_EEHC-L-00164; 2015_22-SAG-OC_EEHC-L-00169; 2015_22-SAG-OC_EEHC-L-00194 2015_22_EEHC_SAG-OC-L-00171 2015_22_EEHC_SAG-OC-L-00172 2015_22_EEHC_SAG-OC-L-00173 2015_22-SAG-OC_EEHC-L-00162 2015_22_EEHC_SAG-OC-L-00150 2015_22_EEHC_SAG-OC-L-00182 2015_22_EEHC_SAG-OC-L-00183 2015_22_EEHC_SAG-OC-L-00173; 2015_22-SAG-OC_EEHC-L-00210 2015_22-EEHC-SAG-L-00070; 2015_22-EEHC-SAG-L-00072 2015_22_EEHC_SAG-OC-L-00176 2015_22_EEHC_SAG-OC-L-00184

2015_22_EEHC_SAG-OC-L-00181; 2015_22-SAG-OC_EEHC-L-00162 2015_22_EEHC_SAG-OC-L-00163 2015_22-SAG-EEHC-L-00268

Page 3 of 5


Letter-No.(int.)

Project: EG1019

Correspondence List (consortium to Customer)

SIEMENS Letter-No.(ext.)

Subject

Reply Req. Corr. Date

Target Date

Status

2015_22-SAG-OC_EEHC-L-00182 2015_22-SAG-OC_EEHC-L-00186 2015_22-SAG-OC_EEHC-L-00191 2015_22-SAG-OC_EEHC-L-00187 2015_22-SAG-OC_EEHC-L-00193 2015_22-SAG-OC_EEHC-L-00194 2015_22-SAG-OC_EEHC-L-00195

Reminder - AFOA Approval for permenant and temporarary Works 500kV Grid Monthly Progress Report No. 10 2015_22-SAG-OC_EEHC-L-00187 Environmental Monitoring Stations – Additional works Offer for extra works at the gas reducing station Re EEHC letter ref. 1327 - SPA Quantities Re Invoice Documentation

Yes No No Yes No No No

18.07.2016 18.07.2016 18.07.2016 21.07.2016 28.07.2016 02.08.2016 02.08.2016

25.07.2016

Sent Completed Completed Sent Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00196 2015_22-SAG-OC_EEHC-L-00198 2015_22-SAG-OC_EEHC-L-00197 2015_22-SAG-OC_EEHC-L-00199 2015_22-SAG-OC_EEHC-L-00200

Request for AFOA approval for intake pipelines and intake heads permanent works EHS Manual Rev D Updated Traffic Management Plan RESEND - Notice of Force Majeure Re Delays in Project Time

No No Yes No No

02.08.2016 03.08.2016 04.08.2016 05.08.2016 05.08.2016

2015_22-SAG-OC_EEHC-L-00203

2015_22-SAG-OC_EEHC-L-00203 Offshore Works’ Permits

No

05.08.2016

2015_22-SAG-OC_EEHC-L-00207 2015_22-SAG-OC_EEHC-L-00211

Re Offshore Mines Scan Agenda for meeting regarding construction of Gas Reducing Station by Owner/GASCO

Yes Yes

05.08.2016 07.08.2016

28.07.2016

11.08.2016

Completed Completed Sent Completed Completed Completed

11.10.2016 09.08.2016

Sent Completed

2015_22-SAG-OC_EEHC-L-00188

Local Authority Approval for Permanent Works of the Discharge Structure and Discharge pipe lines

No

08.08.2016

Completed

2015_22-SAG-OC_EEHC-L-00210 2015_22-SAG-OC_EEHC-L-00184 2015_22-SAG-OC_EEHC-L-00212 2015_22-SAG-OC_EEHC-L-00201 2015_22-SAG-OC_EEHC-L-00213 2015_22-SAG-OC_EEHC-L-00214 2015_22-SAG-OC_EEHC-L-00202 2015_22-SAG-OC_EEHC-L-00215 2015_22-SAG-OC_EEHC-L-00216 2015_22-SAG-OC_EEHC-L-00217 2015_22-SAG-OC_EEHC-L-00219 2015_22-SAG-OC_EEHC-L-00205 2015_22-SAG-OC_EEHC-L-00204 2015_22-SAG-OC_EEHC-L-00206

No No Yes No No No Yes No No Yes Yes No Yes No

08.08.2016 10.08.2016 11.08.2016 15.08.2016 15.08.2016 18.08.2016 29.08.2016 29.08.2016 29.08.2016 04.09.2016 08.09.2016 09.09.2016 12.09.2016 12.09.2016

Completed Completed Sent Completed Completed Completed Sent Completed Completed Sent Sent Completed Sent Completed

2015_22-SAG-OC_EEHC-L-00218 2015_22-SAG-OC_EEHC-L-00220

Commissioning Power Source Re Final Site Layout and Security Requirements 2015_22-SAG-OC_EEHC-L-00212 Condition of the temporary Gas Reducing Station AFOA Approval Requirements Monthly Progress Report No. 11 Part 1/2 Notice of Force Majeure - Additional Floods in China 2015_22-SAG-OC_EEHC-L-00202 Gas Reducing Station – Interface Point Halting Works in Gas Reducing Station Monthly Progress Report No 12. Part 1 of 3 Revised Offer for extra works related to the gas reducing station Height Restriction for Crossing Underneath of Energized 500kV Overhead Transmission Line (OHTL) Offshore Mines Scan on Site Re Gas Reducing Station Interface Point 2015_22-SAG-OC_EEHC-L-00206 Re Offshore Works Permits 2015_22-SAG-OC_EEHC-L-00218 2015_22-SAG-EEHC-L-00316 Re - Condition and Readiness of Temporary Gas Reducing Station Commissioning Power Source

Yes No

12.09.2016 12.09.2016

19.09.2016

Completed Completed

2015_22-SAG-OC_EEHC-L-00221 2015_22-SAG-OC_EEHC-L-00208 2015_22-SAG-OC_EEHC-L-00224 2015_22-SAG-OC_EEHC-L-00225 2015_22-SAG-OC_EEHC-L-00223 2015_22-SAG-OC_EEHC-L-00226 2015_22-SAG-OC_EEHC-L-00228 2015_22-SAG-OC_EEHC-L-00229 2015_22-SAG-OC_EEHC-L-00230 2015_22-SAG-OC_EEHC-L-00232 2015_22-SAG-OC_EEHC-L-00234 2015_22-SAG-OC_EEHC-L-00236 2015_22-SAG-OC_EEHC-L-00227 2015_22-SAG-OC_EEHC-L-00237 2015_22-SAG-OC_EEHC-L-00209 2015_22-SAG-OC_EEHC-L-00239 2015_22-SAG-OC_EEHC-L-00240 2015_22-SAG-OC_EEHC-L-00235 2015_22-SAG-OC_EEHC-L-00231 2015_22-SAG-OC_EEHC-L-00241

Design and operation data, cleanliness for the Permanent and Temporary Gas reducing stations at Burullus site Re Invoice Documentation Incident Report 2015_22-SAG-OC_EEHC-L-00225 RE - Missed Project Schedule Gas supply pressure (long term trend) of upstream gas reducing station Re Delays in Project Time (2) RE Minutes of Meeting 16 August 2016 Mobile Construction Power Switchgear The Application of the Value Added Tax Law No. 67 for Year 2016 Construction of the Alternative Structures Alternative Structures for Air Defense Forces Readiness of GIS gantry (OHL1) for connection with the temporary transmission line (Abu Kir –Badr). Re Gas Reducing Station Interface Point Estimated consumption of the fuel gas during commissioning Re Remarks on Monthly Progress Report No.12 Common Remote Service Platform (cRSP) Interface to DCS Cleaning of gas reducing station_QC documentation_3rd party inspection Monthly Progress Report No. 13 Part 1 of 2 RE Gas pipe line trench in the Gas Reducing Third-Party Inspection of the Main Gas Supply line and Gas Reducing Station

Yes Yes No No Yes No No No No No No Yes Yes No No No Yes No No Yes

16.09.2016 27.09.2016 27.09.2016 27.09.2016 28.09.2016 28.09.2016 28.09.2016 28.09.2016 28.09.2016 28.09.2016 28.09.2016 28.09.2016 30.09.2016 02.10.2016 07.10.2016 07.10.2016 14.10.2016 17.10.2016 18.10.2016 19.10.2016

23.09.2016 12.10.2016

Completed Sent Completed Completed Sent Completed Completed Completed Completed Completed Completed Sent Sent Completed Completed Completed Sent Completed Completed Sent

10.08.2017

16.08.2016

12.09.2016

15.09.2016 15.09.2016 27.09.2016

03.10.2016

05.10.2016 14.10.2016

21.10.2016

24.10.2016

Reference to 2015_22-OC_EEHC-L-00161; 2015_22SAG-OC_EEHC-L-00156

2015_22_EEHC_SAG-OC-L-00131 2015_22-SAG-OC_EEHC-L-00162 2015_22_EEHC_SAG-OC-L-00185 2015_22-SAG-OC_EEHC-L-00188; 2015_22-SAG-OC_EEHC-L-00233

2015_22_EEHC_SAG-OC-L-00188 2015_22-OC_EEHC-L-00196; 2015_22SAG-OC_EEHC-L-00188 2015_22_EEHC_SAG-OC-L-00207; 2015_22-SAG-OC_EEHC-L-00233 2015_22-SAG-OC_EEHC-L-00196; 2015_22-SAG-OC_EEHC-L-00203; 2015_22-SAG-OC_EEHC-L-00233 2015_22_EEHC_SAG-OC-L-00187; 2015_22-SAG-OC_EEHC-L-00174

2015_22-SAG-OC_EEHC-L-00233

2015_22_EEHC_SAG-OC-L-00193

2015_22-SAG-OC_EEHC-L-00158 2015_22-SAG-OC_EEHC-L-00233 2015_22_EEHC_SAG-OC-L-00198 2015_22_EEHC_SAG-OC-L-00201 2015_22_EEHC_SAG-OC-L-00195; 2015_22_EEHC_SAG-OC-L-00202 2015_22_EEHC_SAG-OC-L-00194

2015_22_EEHC_SAG-OC-L-00204 2015_22_EEHC_SAG-OC-L-00192 2015_22_EEHC_SAG-OC-L-00197 2015_22_EEHC_SAG-OC-L-00206

2015_22-EEHC_OC-L-00040 2015_22_EEHC_SAG-OC-L-00205 2015_22_EEHC_SAG-OC-L-00203 2015_22-SAG-OC_EEHC-L-00241 2015_22_EEHC_SAG-OC-L-00210 2015_22-SAG-OC_EEHC-L-00240

Page 4 of 5


Letter-No.(int.)

Project: EG1019

Correspondence List (consortium to Customer)

SIEMENS Subject

Reply Req. Corr. Date

Target Date

Status

2015_22-SAG-OC_EEHC-L-00233 2015_22-SAG-OC_EEHC-L-00242 2015_22-SAG-OC_EEHC-L-00246 2015_22-SAG-OC_EEHC-L-00248 2015_22-SAG-OC_EEHC-L-00250

Offshore Mines Scan Damage of 500kV Cable Notice of Force Majeure Re Mine Clearance Certificate for On-Shore Portion of Works Notice of Force Majeure

Yes No No Yes No

20.10.2016 24.10.2016 24.10.2016 24.10.2016 24.10.2016

03.11.2016

Sent Completed Completed Sent Completed

2015_22-SAG-OC_EEHC-L-00243 2015_22-SAG-OC_EEHC-L-00254

Re Electrical Works Offer for GRS Project Management Plan Rev. A

Yes No

31.10.2016 07.11.2016

07.11.2016

2015_22-SAG-OC_EEHC-L-00255 2015_22-SAG-OC_EEHC-L-00256 2015_22-SAG-OC_EEHC-L-00257

On-Site Tests for MV Cables MoM MDEPC-Meeting on site 8th November 2016 Monthly Progress Report No. 14 Part1/2

No No No

08.11.2016 10.11.2016 14.11.2016

Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00258 2015_22-SAG-OC_EEHC-L-00259 2015_22-SAG-OC_EEHC-L-00260 2015_22-SAG-OC_EEHC-L-00244 2015_22-SAG-OC_EEHC-L-00261 2015_22-SAG-OC_EEHC-L-00245

Re: On-Site Tests for MV Cables Reply to Collective Notes Natural Gas Analysis Executive Order - Increase of fuel prices. Labor Fights Re Electrical Works Offer for GRS

No No Yes No No Yes

14.11.2016 15.11.2016 15.11.2016 16.11.2016 24.11.2016 30.11.2016

16.12.2016

Completed Completed Sent Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00249 2015_22-SAG-OC_EEHC-L-00253

Yes Yes

30.11.2016 30.11.2016

07.12.2016 12.12.2016

Sent Sent

2015_22-SAG-OC_EEHC-L-00251 2015_22-SAG-OC_EEHC-L-00252 2015_22-SAG-OC_EEHC-L-00264 2015_22-SAG-OC_EEHC-L-00268 2015_22-SAG-OC_EEHC-L-00269 2015_22-SAG-OC_EEHC-L-00270 2015_22-SAG-OC_EEHC-L-00271 2015_22-SAG-OC_EEHC-L-00272 2015_22-SAG-OC_EEHC-L-00273 2015_22-SAG-OC_EEHC-L-00263 2015_22-SAG-OC_EEHC-L-00274 2015_22-SAG-OC_EEHC-L-00265 2015_22-SAG-OC_EEHC-L-00275

Performance Letter of Guarantee Requested under the Minutes of the Final Meeting of the SPA Quantities Status RESEND - Re Electrical Works Offer for GRS 2015_22-SAG-OC_EEHC-L-00251 Retention Letter of Guarantee Requested under the Minutes of the Final Meeting of the SPA Quantities Status Extension of the SPA Performance and Retention Letter of Guarantee Notice of Force Majeure Request to send a Letter to AFOA Request to send a Letter to Ministry of Irrigation - Central Sector of Groundwater ReTrip Event of Abu Quir - Burullus Circuit Site Preparation Agreement Completion Date Notice of Force Majeure Re Mine Scan Letter from EEHC dated 22 January 2017 Re: 2015_22-SAG-OC_EEHC-L-00263 Support for Offshore Mines Scan Monthly Progress Report No. 15 Part1/2 Notice of Force Majeure Re Collective notices (2)

Yes Yes No Yes Yes No No No No Yes No No No

01.12.2016 05.12.2016 05.12.2016 05.12.2016 05.12.2016 05.12.2016 05.12.2016 05.12.2016 05.12.2016 06.12.2016 15.12.2016 21.12.2016 21.12.2016

07.12.2016 19.12.2016

Sent Sent Completed Sent Sent Completed Completed Completed Completed Sent Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00276 2015_22-SAG-OC_EEHC-L-00277

Re Time Schedule for First Fire and First power to grid of Units 42, 41, 32 and 31 open cycle Re Trip Event of the Main Transformer BAT41

No No

23.12.2016 31.12.2016

Completed Completed

2015_22-SAG-OC_EEHC-L-00278 2015_22-SAG-OC_EEHC-E-00279 2015_22-SAG-OC_EEHC-L-00279 2015_22-SAG-OC_EEHC-E-00001 2015_22-SAG-OC_EEHC-L-00280 2015_22-SAG-OC_EEHC-L-00281 2015_22-SAG-OC_EEHC-L-00266

Re: Time Schedule for First Fire and First Power to grid of Units 42,41,32,and 31 open cycle (2) 2015_22-SAG-OC_EEHC-L-00279 41BAT01 Trip Event Inspection Report 41BAT01 Trip Event Inspection Report WG: 2015_22-SAG-OC_EEHC-L-00279 41BAT01 Trip Event Inspection Report Re Trip Event of Main Transformer 41BAT Monthly Progress Report No.16 Part1/2 Re Workers in Burullus Project

No No No No No No No

02.01.2017 05.01.2017 05.01.2017 06.01.2017 16.01.2017 24.01.2017 25.01.2017

Completed Completed Completed Completed Completed Completed Completed

2015_22-SAG-OC_EEHC-L-00282 2015_22-SAG-OC_EEHC-L-00283 2015_22-SAG-OC_EEHC-L-00284 2015_22-SAG-OC_EEHC-L-00285 2015_22-SAG-OC_EEHC-L-00287 2015_22-SAG-OC_EEHC-L-00289 2015_22-SAG-OC_EEHC-L-00293 2015_22-SAG-OC_EEHC-L-00292

Trip Event of 41BAT Main Transformer - Minutes of Meeting 14-Jan-2017 Request to send a Letter to Ministry of Transportation - Maritime Transport Sector (MTS) Plant Shutdown for Commissioning Work Request to send a Letter to Ministry of Transportation - Maritime Transport Sector (MTS) Notice of Force Majeure Navigational Traffic Signs around Intake Pipelines Velocity Caps Biodiversity MoU Monthly Progress Report No. 17 Part1/2

No No Yes No No No No No

26.01.2017 03.02.2017 07.02.2017 09.02.2017 09.02.2017 09.02.2017 15.02.2017 17.02.2017

10.08.2017

Letter-No.(ext.)

05.12.2016

22.11.2016

16.01.2017 16.01.2017

13.12.2016

14.02.2017

Completed Completed

Completed Completed Sent Completed Completed Completed Completed Completed

Reference to 2015_22-SAG-OC_EEHC-L-00188; 2015_22-SAG-OC_EEHC-L-00196; 2015_22-SAG-OC_EEHC-L-00201; 2015_22-SAG-OC_EEHC-L-00205; 2015_22-SAG-OC_EEHC-L-00207 2015_22_EEHC_SAG-OC-L-00212 2015_22_EEHC_SAG-OC-L-00220 2015_22_EEHC_SAG-OC-L-00193; 2015_22_EEHC_SAG-OC-L-00211 2015_22_EEHC_SAG-OC-L-00215; 2015_22-SAG-OC_EEHC-L-00305

2015_22_EEHC_SAG-OC-L-00219; 2015_22-SAG-OC_EEHC-L-00305 2015_22_EEHC_SAG-OC-L-00208 2015_22-SAG-OC_EEHC-L-00158 2015_22_EEHC_SAG-OC-L-00218

2015_22_EEHC_SAG-OC-L-00218

2015_22_EEHC_SAG-OC-L-00228

2015_22_EEHC_SAG-OC-L-00224 2015_22_EEHC_SAG-OC-L-00225; 2015_22_EEHC_SAG-OC-L-00226 2015_22_EEHC_SAG-OC-L-00227 2015_22_EEHC_SAG-OC-L-00230; 2015_22_EEHC_SAG-OC-L-00231

2015_22_EEHC_SAG-OC-L-00234 2015_22_EEHC_SAG-OC-L-00223 2015_22_EEHC_SAG-OC-L-00227; 2015_22_EEHC_SAG-OC-L-00233

Page 5 of 5


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

A 3. Correspondence status SAG

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Project: EG1019 MPR No.: 23

Correspondence List (Customer to SAG)

SIEMENS Letter-No.(int.) 2015_22-EEHC-SAG-L-00001

Letter-No.(ext.)

Subject EG1019 PM 2015_22-EEHC-SAG-L-0001 500 KV Outdoor Equipment

Reply Req. Corr. Date Yes 09.09.2015

Target Date 23.09.2015

Status Completed

2015_22-EEHC-SAG-L-00002 2015_22-EEHC-SAG-L-00003

2015_22-EEHC-SAG-L-00002

EG1019 PM 2015_22-EEHC_SAG-L-00002 500KV Switchgear, Battery, Charger, Steel Structure, Over Head Crane EG 1019 PM 2015_22-EEHC_SAG -L-00003 Training on electronic correspondences

Yes No

28.09.2015 29.09.2015

02.10.2015

Completed Completed

2015_22-EEHC-SAG-L-00004

2015_22-EEHC_SAG -L-00004 500 KV GIS local control cubicle design

Yes

29.09.2015

05.10.2015

Completed

2015_22-SAG-EEHC-L-00030; 2015_22-SAG-EEHC-L-00049

2015_22-EEHC-SAG-L-00005

EG 1019 PM 2015_22- EEHC-SAG-L-00005

Yes

30.09.2015

07.10.2015

Completed

2015_22-SAG-EEHC-L-00026; 2015_22-SAG-EEHC-L-00027; 2015_22-SAG-EEHC-L-00043

2015_22-EEHC-SAG-L-00006

EG 1019 CON 2015_22- EEHC-SAG -L-00006 500KV switchgear, spare feeder bay = B23 Re: EG1019 PM 2015_22-SAG-EEHC-L-00019 Contractual Clarification List Items 177 and 324 Flow Measurements for Sulphur Heaters

Yes

07.10.2015

14.10.2015

Completed

2015_22-SAG-EEHC-L-00041; 2015_22-SAG-EEHC-L-00046

2015_22-EEHC-SAG-E-00006

Yes

09.10.2015

20.10.2015

Completed

2015_22-SAG-EEHC-L-00058

2015_22-EEHC-SAG-E-00007

WG: referring to burullus , meni suef and new administrative capital combined cycle power projects

No

19.10.2015

2015_22-EEHC-SAG-E-00008

specification for transformer and generator monitoring

Yes

19.10.2015

26.10.2015

Completed

2015_22-SAG-EEHC-L-00054; 2015_22-SAG-EEHC-L-00059

2015_22-EEHC-SAG-L-00007

EG 1019 PM 2015_22- EEHC-SAG -L-00007 Secondary system, local control cubicle

Yes

19.10.2015

24.10.2015

Completed

2015_22-SAG-EEHC-L-00044; 2015_22-SAG-EEHC-L-00062

2015_22-EEHC-SAG-L-00008 2015_22-EEHC-SAG-L-00010

Re:Reminder telecomunication EG 1019 PM 2015_22-SAG- EEHC-L-00010 500 KV GIS local control cubicle design

Yes Yes

20.10.2015 21.10.2015

06.11.2015 25.10.2015

Completed Completed

2015_22-SAG-EEHC-L-00036; 2015_22-SAG-EEHC-L-00052 2015_22-SAG-EEHC-L-00067

2015_22-SAG- EEHC-L-00011 Switchgear Bay Feeder 23

Yes

22.10.2015

29.10.2015

Completed

2015_22-SAG-PGE-L-00070; 2015_22-SAG-PGE-L-00102

Re: AW: 2015_22-SAG- EEHC-L-00009 HV Equipment connection at Gantry Area

Yes

23.10.2015

30.10.2015

Completed

2015_22-SAG-EEHC-L-00047; 2015_22-SAG-EEHC-L-00068; 2015_22-SAG-EEHC-L-00073

2015_22- EEHC- SAG -T-000001 Inspection and Test Plan concerning Exhaust System 2015_22-EEHC-SAG-T-000002 AC/DC Distribution Single lines, AC load Calculation 2015_22- EEHC-SAG -T-000003 Electrical Single Line Diagram

Yes Yes Yes

24.10.2015 25.10.2015 26.10.2015

28.10.2015 30.10.2015 30.10.2015

Completed Completed Completed

2015_22-SAG-EEHC-L-00065; 2015_22-SAG-EEHC-L-00106 2015_22-SAG-EEHC-L-00066 2015_22-SAG-EEHC-L-00084

Yes

26.10.2015

30.10.2015

Completed

2015_22-EEHC-SAG-E-00007; 2015_22-SAG-EEHC-L-00054; 2015_22-SAG-EEHC-L-00082

No Yes

27.10.2015 27.10.2015

03.11.2015

Completed Completed

2015_22-SAG-EEHC-E-00001 2015_22-SAG-EEHC-L-00080

Yes Yes

29.10.2015 01.11.2015

05.11.2015 06.11.2015

Completed Completed

2015_22-SAG-EEHC-L-00092 2015_22-SAG-OC_EEHC-L-00053

2015_22-EEHC-SAG-E-00013

2015_22- EEHC-SAG - L-000013 Generator Transformer Monitoring Re: EG1019 PM 2015_22-SAG-EEHC-L-00061 Comment to Client letter 2015_22-EEHC-SAG-L0002, Battery and UPS, Specification Lead acid battery (DTS0055) _22- EEHC-SAG -L-00012 Secondary system, local control cubicle 2015_22-EEHC-SAG-T-000004 Inspection and Test Plan for Generator and Generator Circuit Breaker EG1019 PM 2015_22- EEHC_SAG- L-00014 Load List for Auxiliaries for all units Re: EG1019 PM 2015_22-SAG-EEHC-L-00065 Inspection and Test Plan concerning Exhaust System

Yes

03.11.2015

04.11.2015

Completed

2015_22-SAG-EEHC-L-00075

2015_22-EEHC-SAG-E-00036 2015_22-EEHC-SAG-L-00015 2015_22-EEHC-SAG-L-00016

Fw: Assumptions for the design of the receiving gantry for Burullus PP Project EG 1019 PM 2015_22-EEHC-SAG -L-00015 Subcontractor of HRSG EG1019 PM 2015_22- EEHC-SAG-L-00016 ITP Meeting

Yes No Yes

03.11.2015 08.11.2015 08.11.2015

06.11.2015 13.11.2015

Completed Completed Completed

2015_22-SAG-EEHC-L-00051; 2015_22-SAG-EEHC-L-00074 2015_22-SAG-EEHC-L-00077 2015_22-SAG-EEHC-L-00085

2015_22-EEHC-SAG-E-00038

EG1019 PM 2015 - 23-SAG-EEHC

Yes

09.11.2015

14.11.2015

Completed

2015_22-SAG-EEHC-L-00051; 2015_22-SAG-EEHC-L-00088; 2015_22-SAG-EEHC-L-00089

2015_22-EEHC-SAG-L-00017 2015_22-EEHC-SAG-E-00014 2015_22-EEHC-SAG-L-00018

EG1019 PM 2015_22- EEHC-SAG -L-00017 Shipper's own container-Ownership Structures EEHC Chairman delegation letter for Burullus EG1019 PM 2015_22- EEHC-SAG -L-00018 RE: Generator Rotor Removal Concept

Yes No Yes

10.11.2015 13.11.2015 16.11.2015

17.11.2015 23.11.2015

Completed Completed Completed

2015_22-EEHC-SAG-E-00015 2015_22-EEHC-SAG-L-00019 2015_22-EEHC-SAG-L-00021

EG1019 2015_22- EEHC-SAG -L-00019 Owner Required Letters. EG1019 PM 2015_22- EEHC-SAG -L-00021 Nomination of new supplier

Yes Yes Yes

17.11.2015 17.11.2015 17.11.2015

24.11.2015 25.11.2015 23.11.2015

Completed Completed Completed

2015_22-SAG-EEHC-L-00101 2015_22-SAG-OC_EEHC-L-00057; 2015_22-SAG-OC_EEHC-L00068 2015_22-SAG-EEHC-L-00105 2015_22-SAG-EEHC-L-00096

2015_22-EEHC-SAG-L-00020 2015_22-EEHC-SAG-E-00022

2015_22- EEHC-SAG -L-00020 Generator Transformer Monitoring EG1019 PM 2015_22- EEHC-SAG -L-00022 Nomination of new supplier

Yes No

18.11.2015 21.11.2015

03.12.2015

Completed Completed

2015_22-SAG-EEHC-L-00082; 2015_22-SAG-EEHC-L-00102 2015_22-SAG-EEHC-L-00096

2015_22-EEHC-SAG-L-00024

2015_22- EEHC-SAG -L-00024 500 KV GIS,Telecommunication system

Yes

21.11.2015

26.11.2015

Completed

2015_22-SAG-EEHC-L-00033; 2015_22-SAG-EEHC-L-00055; 2015_22-SAG-EEHC-L-00110

2015_22-EEHC-SAG-L-00023 2015_22-EEHC-SAG-E-00039 2015_22-EEHC-SAG-L-00025 2015_22-EEHC-SAG-L-00026 2015_22-EEHC-SAG-E-00040 2015_22-EEHC-SAG-E-00043 2015_22-EEHC-SAG-E-00041 2015_22-EEHC-SAG-E-00042 2015_22-EEHC-SAG-L-00027 2015_22-EEHC-SAG-L-00028 2015_22-EEHC-SAG-L-00029

2015_22- EEHC-SAG -L-00023 Feeder =B23, Local control cubicle and secondary systems RE: 2015_22- EEHC_SAG-OC -L-00041 Letter to Minister of Transportation 2015_22- EEHC-SAG -L-00025 Electrical Single Line Diagram EG1019 PM2015_22- EEHC-SAG -L-00026 Air intake filter clarifications Connecting West Burullus & New Capital PS 500 kV 2015_22- EEHC-SAG -T-000005 Water Balance 2015-22-SAG-EEHC-L-00100 Required Data for insulation coordination study 2015-22-sag-oceehc-l-0065 driven piles - steel pipes 2015_22-SAG- EEHC-L-00027 Re: Owner Required Letters 2015_22-SAG- EEHC-L-00028 500 kV GlS, Spare feeder bay =B23 EG1019 PM 2015_22- EEHC-SAG -L-00029- Re 11 KV Commissioning Power Details

No No Yes Yes Yes Yes Yes Yes No Yes Yes

22.11.2015 24.11.2015 26.11.2015 26.11.2015 29.11.2015 01.12.2015 02.12.2015 03.12.2015 05.12.2015 05.12.2015 05.12.2015

2015_22-EEHC-SAG-L-00011

2015_22-EEHC-SAG-L-00011

2015_22-EEHC-SAG-L-00009 2015_22-EEHC-SAG-E-00032 2015_22-EEHC-SAG-E-00016 2015_22-EEHC-SAG-E-00033

2015_22-EEHC-SAG-T-000001 2015_22-EEHC-SAG-T-000002 2015_22-EEHC-SAG-T-000003

2015_22-EEHC-SAG-L-00013 2015_22-EEHC-SAG-E-00009 2015_22-EEHC-SAG-L-00012 2015_22-EEHC-SAG-E-00017 2015_22-EEHC-SAG-L-00014

10.08.2017

2015_22-EEHC-SAG-T-000004

2015_22-EEHC-SAG-T-000005

Reference to 2015_22-SAG-EEHC-L-00031

2015_22-SAG-EEHC-L-00028; 2015_22-SAG-EEHC-L-00029; 2015_22-SAG-EEHC-L-00044; 2015_22-SAG-EEHC-L-00045; 2015_22-SAG-EEHC-L-00061

Completed

05.12.2015 05.12.2015 11.12.2015 06.12.2015 16.12.2015 11.12.2015 11.12.2015 11.12.2015

Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00072; 2015_22-SAG-EEHC-L-00081

2015_22-SAG-EEHC-L-00080; 2015_22-SAG-EEHC-L-00099 2015_22_EEHC_SAG-OC-L-00041 2015_22-SAG-EEHC-L-00116 2015_22-SAG-EEHC-L-00118 2015_22-SAG-EEHC-L-00122 2015_22-SAG-EEHC-L-00120 2015_22-SAG-EEHC-L-00123 2015_22-SAG-OC_EEHC-L-00065 2015_22-SAG-EEHC-L-00126 2015_22-SAG-EEHC-L-00109

Page 1 of 4


Project: EG1019 MPR No.: 23

Correspondence List (Customer to SAG)

SIEMENS Letter-No.(int.)

Letter-No.(ext.)

2015_22-EEHC-SAG-E-00044 2015_22-EEHC-SAG-E-00075

2015_22-EEHC-SAG-T-000006 2015_22-EEHC-SAG-T-000007

Subject EG1019 PM 2015_22- EEHC-SAG -T-000006 Specification for Grounding and Lightning Protection System EG1019 PM 2015_22- EEHC-SAG -T-000007 IEEE AVR / PSS Model Descriptions

Reply Req. Corr. Date

Target Date

Status

Reference to

Yes Yes

06.12.2015 06.12.2015

14.12.2015 19.07.2016

Completed Completed

2015_22-EEHC-SAG-E-00046 2015_22-EEHC-SAG-L-00030 2015_22-EEHC-SAG-E-00045 2015_22-EEHC-SAG-L-00031 2015_22-EEHC-SAG-E-00047

2015_22-EEHC-SAG-T-000008

2015_22-SAG-EEHC-L-00136

No Yes Yes Yes Yes

07.12.2015 07.12.2015 08.12.2015 08.12.2015 10.12.2015

11.12.2015 15.12.2015 15.12.2015 15.12.2015

Completed Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00128 2015_22-SAG-EEHC-L-00231 2015_22-SAG-EEHC-L-00119 2015_22-SAG-EEHC-L-00346

Yes Yes

15.12.2015 15.12.2015

23.12.2015 22.12.2015

Completed Completed

2015_22-SAG-EEHC-L-00158 2015_22-SAG-EEHC-L-00178

2015_22-EEHC-SAG-L-00032

2015_22- EEHC-SAG -T-000008 Revision Inspection and Test Plan for Generator Circuit Breaker EG1019 PM 2015_22- EEHC-SAG -L-00030 - Re Inspection Schedule Exhaust Bypass Stack GA drawing, P&ID L-00031 Nomination of additional supplier Missed pages in Contract (2) 2015_22- EEHC-SAG -T-000011 Inspection and Test Plan concerning Low Voltage Switchgear ,battery and SFC/SEE equipment 2015_22- EEHC-SAG -T-000010 Inspection and Test Plan for battery EG1019 PM 2015_22- EEHC-SAG -L-00032 - Re Protection Panels for Generator and Steam Turbine

2015_22-EEHC-SAG-E-00048 2015_22-EEHC-SAG-E-00049

2015_22-EEHC-SAG-T-000011 2015_22-EEHC-SAG-T-000010

No

16.12.2015

Completed

2015_22-SAG-EEHC-L-00121

2015_22-EEHC-SAG-L-00033 2015_22-EEHC-SAG-E-00050 2015_22-EEHC-SAG-L-00034 2015_22-EEHC-SAG-E-00051

2015_22-SAG- EEHC-L-00033 Inspection Arrangements 2015_22- EEHC-SAG -T-000012 P&IDs for Fuel Gas System and Fuel Gas Compressor 2015_22- EEHC-SAG -L-00034 Water Balance 2015_22- EEHC-SAG -T-000014 I&C DCS Cabinet Overview

Yes Yes Yes Yes

17.12.2015 18.12.2015 18.12.2015 20.12.2015

22.12.2015 25.12.2015 25.12.2015 23.12.2015

Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00103; 2015_22-SAG-EEHC-L-00125 2015_22-SAG-EEHC-L-00155 2015_22-SAG-EEHC-L-00131 2015_22-SAG-EEHC-L-00134

2015_22-EEHC-SAG-L-00035

EG1019 PM 2015_22- EEHC-SAG-L-00035 - RE Invitation for Surge Arrestors

Yes

21.12.2015

28.12.2015

Completed

2015_22-SAG-EEHC-L-00103; 2015_22-SAG-EEHC-L-00132

2015_22-EEHC-SAG-E-00052 2015_22-EEHC-SAG-E-00053 2015_22-EEHC-SAG-E-00054 2015_22-EEHC-SAG-E-00055

Connecting West Burullus & New Capital P/S 500 kV 2015-23-SAG-EEHC-L-00116 Invitation for Factory Acceptance Tests Surge Arresters 2015_22- EEHC-SAG -T-000013 Auxiliary system P&IDs for GHC, GM and QFB 2015_22- EEHC-SAG -T-000015 GTG OEMs documents (Part 1)

Yes Yes Yes Yes

22.12.2015 22.12.2015 22.12.2015 22.12.2015

05.01.2016 05.01.2016 29.12.2015 29.12.2016

Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00140; 2015_22-SAG-EEHC-L-00153 2015_22-SAG-EEHC-L-00137 2015_22-SAG-EEHC-L-00166 2015_22-SAG-EEHC-L-00210

2015_22-EEHC-SAG-E-00056

Fw: 2015-23-SAG-EEHC-L-00116 Invitation for Factory Acceptance Tests Surge Arresters

Yes

24.12.2015

07.01.2016

Completed

2015_22-SAG-EEHC-L-00103; 2015_22-SAG-EEHC-L-00137

2015_22-EEHC-SAG-E-00057

Fw: 2015-23-SAG-EEHC-L-00116 Invitation for Factory Acceptance Tests Surge Arresters

Yes

24.12.2015

07.01.2016

Completed

2015_22-SAG-EEHC-L-00103; 2015_22-SAG-EEHC-L-00137

2015_22-EEHC-SAG-E-00058

2015_22-SAG-EEHC-L-00132 Invitation for Surge Arrestors

Yes

24.12.2015

31.12.2015

Completed

2015_22-SAG-EEHC-L-00103; 2015_22-SAG-EEHC-L-00132

2015_22-EEHC-SAG-L-00036

2015_22-SAG- EEHC-L-00036 Protection Panels for Generator and Steam Turbine

Yes

25.12.2015

04.01.2016

Completed

2015_22-SAG-EEHC-L-00121; 2015_22-SAG-EEHC-L-00164

2015_22-EEHC-SAG-L-00037

2015_22-EEHC- SAG-L-00037 Re: Inspection Schedule

Yes

30.12.2015

06.01.2016

Completed

2015_22-SAG-EEHC-L-00128; 2015_22-SAG-EEHC-L-00161

2015_22-EEHC-SAG-L-00038 2015_22-EEHC-SAG-L-00039 2015_22-EEHC-SAG-E-00059 2015_22-EEHC-SAG-E-00060

2015_22-EEHC-SAG-T-000016 2015_22-EEHC-SAG-T-000017

No Yes Yes Yes

30.12.2015 31.12.2015 10.01.2016 10.01.2016

07.01.2016 15.01.2016 15.01.2016

Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00135 2015_22-SAG-EEHC-L-00145 2015_22-SAG-EEHC-L-00168 2015_22-SAG-EEHC-L-00162

2015_22-EEHC-SAG-E-00061

2015_22-EEHC-SAG-T-000018

2015_22-EEHC- SAG-L-00038 Re: BCU and HMI Typical Screen Pictures 2015_22- EEHC-SAG -L-00039 Issues of Debate 2015_22- EEHC-SAG -T-000016 P&IDs Water/Steam Cycle and Cooling Water Systems 2015_22- EEHC-SAG -T-000017 P&IDs Water/Steam Cycle and Cooling Water Systems 2015_22-EEHC-SAG-T-000018 Inspection and Test Plan concerning Feed water pump, main transformer and HRSG

Yes

17.01.2016

22.01.2016

Completed

2015_22-SAG-EEHC-L-00176

2015_22-EEHC-SAG-T-000020 2015_22-EEHC-SAG-T-000019

2015_22-EEHC- SAG-L-00040 SCS and DCS Signal list 2015_22-EEHC-SAG-L-00041 Nomination of Additional Suppliers for Valves 2015_22-EEHC-SAG-T-000020 P&IDs water/steam cycle and cooling water systems 2015_22-EEHC-SAG-T-000019 Piping and Instrumentation Diagram (P&ID) of HRSG

Yes Yes Yes Yes

17.01.2016 17.01.2016 20.01.2016 20.01.2016

24.01.2016 26.01.2016 27.01.2016 27.01.2016

Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00146; 2015_22-SAG-EEHC-L-00182 2015_22-SAG-EEHC-L-00157 2015_22-SAG-EEHC-L-00173 2015_22-SAG-EEHC-L-00172

2015_22-EEHC-SAG-L-00042 2015_22-EEHC-SAG-L-00043 2015_22-EEHC-SAG-L-00044

2015_22-EEHC- SAG-L-00042 SCS Functional Design Specification 2015_22- EEHC-SAG -L-00043 RE: P&lDs for Fuel Gas system and Fuel Gas Compressor PM 2015_22- EEHC-SAG -L-00044 SCS Properties

Yes Yes Yes

20.01.2016 22.01.2016 22.01.2016

28.01.2016 29.01.2016 29.01.2016

Completed Completed Completed

2015_22-SAG-EEHC-L-00149; 2015_22-SAG-EEHC-L-00194 2015_22-SAG-EEHC-L-00185 2015_22-SAG-EEHC-L-00174

2015_22-EEHC-SAG-L-00046 2015_22-EEHC-SAG-L-00045 2015_22-EEHC-SAG-E-00064

2015_22-EEHC-SAG-L-00046 Air intake filter clarifications 2015_22- EEHC-SAG -L-00045 Water / Steam Cycle Meeting Summary Burullus Project - 2015_22-SAG-EEHC-L-00184 SF6 Air Bushing Specification 3150A

Yes Yes Yes

30.01.2016 31.01.2016 07.02.2016

05.02.2016 05.02.2016 19.02.2016

Completed Completed Completed

2015_22-SAG-EEHC-L-00078; 2015_22-SAG-EEHC-L-00232 2015_22-SAG-EEHC-L-00191 2015_22-SAG-EEHC-L-00184

2015_22-EEHC- SAG-L-00047 Re: Fuel Gas analysis 2015_22-EEHC-SAG-T-000022 Service Cooling Water System 2015_22-EEHC-SAG-T-000023 SGC Fire Fighting System P&ID 2015_22- EEHC-SAG -T-000021 GT and ST Documents

Yes Yes Yes Yes

14.02.2016 15.02.2016 15.02.2016 15.02.2016

19.02.2016 22.02.2016 22.02.2016 22.02.2016

Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00188; 2015_22-SAG-EEHC-L-00228 2015_22-SAG-EEHC-L-00207 2015_22-SAG-EEHC-L-00202 2015_22-SAG-EEHC-L-00205

2015_22-EEHC- SAG-L-00048 Water/ Steam Cycle

Yes

15.02.2016

22.02.2016

Completed

2015_22-EEHC-SAG-L-00045; 2015_22-SAG-EEHC-L-00162; 2015_22-SAG-EEHC-L-00203

2015_22- EEHC-SAG -L-00050 P&IDs for Fuel Gas system and Fuel Gas Compressor 2015_22-EEHC- SAG-L-00051 Frequency bandwidth of DPLC 2 2015_22-EEHC-SAG-T-000024 P&I Diagram Instrument Air System Unit 42 2015_22-EEHC_SAG-L-00052 Equipment of Temporary Entry

Yes No Yes Yes

16.02.2016 17.02.2016 23.02.2016 29.02.2016

23.02.2016 28.02.2016 07.03.2016

Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00185; 2015_22-SAG-EEHC-L-00204 2015_22-SAG-EEHC-L-00153 2015_22-SAG-EEHC-L-00263

2015_22-EEHC-SAG-L-00054

2015_22-EEHC_SAG-L-00054 Diesel Generator Concept

Yes

08.03.2016

23.03.2016

Completed

2015_22-SAG-EEHC-L-00183; 2015_22-SAG-EEHC-L-00229

2015_22-EEHC-SAG-L-00055 2015_22-EEHC-SAG-L-00056

2015_22-EEHC_SAG-L-00055 Fire Fighting System P&ID 2015_22-EEHC_SAG-L-00056 Fuel gas analysis for performance test

Yes No

08.03.2016 15.03.2016

23.03.2016

Completed Completed

2015_22-SAG-EEHC-L-00202; 2015_22-SAG-EEHC-L-00226 2015_22-SAG-EEHC-L-00196

2015_22-EEHC-SAG-L-00057 2015_22-EEHC-SAG-E-00070

PM 2015_22-EEHC-SAG-L-00057 GT OEMs Documents (Part1) Commissioning & Startup

Yes Yes

20.03.2016 29.03.2016

29.03.2016 05.04.2016

Completed Completed

2015_22-EEHC-SAG-T-000015; 2015_22-SAG-EEHC-L-00210; 2015_22-SAG-EEHC-L-00233 2015_22-SAG-EEHC-L-00227

2015_22-EEHC-SAG-L-00040 2015_22-EEHC-SAG-L-00041 2015_22-EEHC-SAG-E-00062 2015_22-EEHC-SAG-E-00063

2015_22-EEHC-SAG-L-00047 2015_22-EEHC-SAG-E-00066 2015_22-EEHC-SAG-E-00067 2015_22-EEHC-SAG-E-00068

2015_22-EEHC-SAG-T-000009

2015_22-EEHC-SAG-T-000012 2015_22-EEHC-SAG-T-000014

2015_22-EEHC-SAG-T-000013 2015_22-EEHC-SAG-T-000015

2015_22-EEHC-SAG-T-000022 2015_22-EEHC-SAG-T-000023 2015_22-EEHC-SAG-T-000021

2015_22-EEHC-SAG-L-00048 2015_22-EEHC-SAG-L-00050 2015_22-EEHC-SAG-L-00051 2015_22-EEHC-SAG-E-00069 2015_22-EEHC-SAG-L-00052

10.08.2017

2015_22-EEHC-SAG-T-000024

Page 2 of 4


Project: EG1019 MPR No.: 23

Correspondence List (Customer to SAG)

SIEMENS Letter-No.(int.) 2015_22-EEHC-SAG-E-00072 2015_22-EEHC-SAG-L-00058

Letter-No.(ext.)

Subject packing lists 2015_22- EEHC-SAG -L-00058 Re Diesel Generator Concept

Reply Req. Corr. Date Yes 13.04.2016 Yes 13.04.2016

Target Date 22.04.2016 21.04.2016

Status Completed Completed

Reference to

2015_22-EEHC-SAG-L-00059 2015_22-EEHC-SAG-L-00060

2015_22-EEHC-SAG-L-00059 2015_22-EEHC-SAG-L-00060

2015_22-EEHC_SAG-L-00059 Air Intake Filter Clarifications 2 2015_22-EEHC_SAG-L-00060 Fire and Explosion Protection Concept

Yes Yes

15.04.2016 17.04.2016

26.04.2016 26.04.2016

Completed Completed

2015_22-SAG-EEHC-L-00232; 2015_22-SAG-EEHC-L-00242 2015_22-SAG-EEHC-L-00280

2015_22-EEHC-SAG-L-00061

2015_22-EEHC_SAG-L-00061 Water Steam Cycle-PAC pump documents

Yes

30.04.2016

09.05.2016

Completed

2015_22-SAG-EEHC-L-00203; 2015_22-SAG-EEHC-L-00251

2015_22-EEHC-SAG-L-00062 2015_22-EEHC-SAG-L-00063

2015_22-EEHC_SAG-L-00062 Re: Fuel Gas analysis 2015_22-EEHC_SAG-L-00063 Starting System Transformers Shipment

Yes Yes

30.04.2016 30.04.2016

20.05.2016 09.05.2016

Completed Completed

2015_22-EEHC-SAG-L-00067; 2015_22-SAG-EEHC-L-00228 2015_22-SAG-EEHC-L-00244

2015_22-EEHC-SAG-L-00065

2015_22-EEHC_SAG-L-00065 Re: NECC letter, signal list

Yes

21.05.2016

30.05.2016

Completed

2015_22-SAG-EEHC-L-00243; 2015_22-SAG-EEHC-L-00253; 2015_22-SAG-EEHC-L-00274

2015_22-EEHC-SAG-L-00066 2015_22-EEHC-SAG-L-00067

2015_22-EEHC_SAG-L-00066 Nominees for Factory Tests 1 2015_22-EEHC_SAG-L-00067 Re: Fuel Gas analysis

Yes No

26.05.2016 09.06.2016

08.06.2016

Completed Completed

2015_22-SAG-EEHC-L-00250; 2015_22-SAG-EEHC-L-00262 2015_22-SAG-EEHC-L-00062

2015_22-EEHC-SAG-L-00068

2015_22-EEHC-SAG-L-00068 Inspection Call for Gas Turbine 21

Yes

09.06.2016

17.06.2016

Completed

2015_22-SAG-EEHC-L-00252; 2015_22-SAG-EEHC-L-00259

2015_22-EEHC_SAG-L-00070 Detailed Schedule of GIS Works 2015_22-EEHC-SAG-L-00069 QST Documents 2015_22-EEHC-SAG-L-00071 Re: Inspection Call Final Acceptance XKA, Inspection Schedule

Yes Yes No

12.06.2016 15.06.2016 17.06.2016

23.06.2016 22.06.2016

Completed Completed Completed

2015_22-SAG-EEHC-L-00268; 2015_22-SAG-OC_EEHC-L-00175; 2015_22-SAG-OC_EEHC-L-00179 2015_22-SAG-EEHC-L-00261 2015_22-SAG-EEHC-L-00258

2015_22-EEHC-SAG-L-00072 2015_22-EEHC-SAG-L-00073

Gantry Construction Required for the 500kV Burullus / Samanod Transmission Line 2015_22-EEHC_SAG-L-00073 Temporary Setting of Distance Relays for Burullus/Abu Quir

Yes Yes

22.06.2016 22.06.2016

29.06.2016 29.06.2016

Completed Completed

2015_22-SAG-EEHC-L-00268; 2015_22-SAG-OC_EEHC-L-00175 2015_22-SAG-EEHC-L-00272

2015_22-EEHC-SAG-L-00074 2015_22-EEHC-SAG-L-00075

2015_22-EEHC_SAG-L-00074 Settings of Protection Relays for Outgoing Circuits 2015_22-EEHC-SAG-L-00075 Documentation Quantities

Yes Yes

27.06.2016 03.07.2016

05.07.2016 07.10.2016

Completed Completed

2015_22-SAG-EEHC-L-00247; 2015_22-SAG-EEHC-L-00282 2015_22-SAG-EEHC-L-00353

2015_22-EEHC-SAG-L-00076

2015_22-EEHC-SAG-L-00076 Inspection call, 21BBT Auxiliary Transformer, 20MKA Generator

Yes

14.07.2016

21.07.2016

Completed

2015_22-SAG-EEHC-L-00283; 2015_22-SAG-EEHC-L-00284

2015_22-EEHC-SAG-L-00077

EG 1019 PM 2015_22-EEHC-SAG-L-00077 Inspection nominees for 21BBT Auxiliary Transformer, 20MKA Generator

Yes

18.07.2016

25.07.2016

Completed

2015_22-SAG-EEHC-L-00283; 2015_22-SAG-EEHC-L-00284; 2015_22-SAG-EEHC-L-00292

2015_22-EEHC-SAG-L-00078

2015_22-EEHC-SAG-L-00078 NOMINEES FOR PCC 21UBA3210

Yes

20.07.2016

27.07.2016

Completed

2015_22-EEHC-SAG-L-00066; 2015_22-SAG-EEHC-L-00283; 2015_22-SAG-EEHC-L-00290

2015_22-EEHC-SAG-L-00079

Yes

21.07.2016

28.07.2016

Completed

2015_22-EEHC-SAG-L-00077; 2015_22-EEHC-SAG-L-00078; 2015_22-SAG-EEHC-L-00287; 2015_22-SAG-EEHC-L-00290

2015_22-EEHC-SAG-E-00077

2015_22- EEHC-SAG -L-00079 Re Inspection call, PCC, Inspection schedule RE: 2015_22-SAG-OC_EEHC-L-00178 Reminder - Shore Protection Approval on Intake and Discharge Structures

Yes

24.07.2016

29.07.2016

Completed

2015_22-SAG-OC_EEHC-L-00178

2015_22-EEHC-SAG-L-00080 2015_22-EEHC-SAG-L-00081

2015_22- EEHC-SAG -L-00080 Re Signal list, protection signals 2015_22-EEHC-SAG-L-00081 Vibration Protection

Yes Yes

27.07.2016 28.07.2016

04.08.2016 04.08.2016

Completed Completed

2015_22-SAG-EEHC-L-00274; 2015_22-SAG-EEHC-L-00294 2015_22-SAG-EEHC-L-00296

2015_22-EEHC-SAG-L-00082

2015_22-EEHC-SAG-L-00082 Re Fire and Explosion Protection Concept

Yes

28.07.2016

04.08.2016

Completed

2015_22-SAG-EEHC-L-00280; 2015_22-SAG-EEHC-L-00293

2015_22-EEHC-SAG-L-00083

2015_22-EEHC_SAG-L-00083 Settings of Protection Relays for Outgoing Circuits, Temporary distance relay settings

Yes

17.08.2016

25.08.2016

Completed

2015_22-SAG-EEHC-L-00272; 2015_22-SAG-EEHC-L-00278; 2015_22-SAG-EEHC-L-00282; 2015_22-SAG-EEHC-L-00327

2015_22-EEHC-SAG-L-00084

2015_22-EEHC-SAG-L-00084 Re permission to export fuel gas sample bottle

Yes

23.08.2016

31.08.2016

Completed

2015_22-SAG-EEHC-L-00148; 2015_22-SAG-EEHC-L-00196; 2015_22-SAG-EEHC-L-00302; 2015_22-SAG-EEHC-L-00330

03.10.2016 03.10.2016 11.10.2016

Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00304 2015_22-SAG-EEHC-L-00314 2015_22-SAG-EEHC-L-00335

2015_22-EEHC-SAG-L-00070 2015_22-EEHC-SAG-L-00069 2015_22-EEHC-SAG-L-00071

2015_22-EEHC-SAG-L-00069

2015_22-SAG-EEHC-L-00235

2015_22-EEHC-SAG-E-00304 2015_22-EEHC-SAG-L-00085 2015_22-EEHC-SAG-L-00086 2015_22-EEHC-SAG-L-00088

2015_22-SAG-EEHC-L-00304_RESEND Resend: 2015_22-SAG-EEHC-L-00304 Gas Pressure Reducing Station 2015_22-EEHC-SAG-L-00085 Re Gas Pressure Reducing Station 2015_22-EEHC-SAG-L-00086 Operating Staff for GIS 2015_22-EEHC-SAG-L-00088 Surge Arrester in Generator Circuit Breaker

No Yes Yes Yes

29.08.2016 24.09.2016 25.09.2016 03.10.2016

2015_22-EEHC-SAG-L-00089 2015_22-EEHC-SAG-L-00090 2015_22-EEHC-SAG-L-00091 2015_22-EEHC-SAG-L-00092 2015_22-EEHC-SAG-E-00079

2015_22-EEHC_SAG-L-00089 Spare Parts Offer 2015_22-EEHC-SAG-L-00090 Data for the GRS 2015_22-EEHC_SAG-L-00091 Material Safety Data Sheet of Natural Gas 2015_22-EEHC-SAG-L-00092 Nominee for Main Transformer Inspection 500 kV Cables Connecting Step-up transformer to 500 kV GIS

Yes Yes No Yes Yes

09.10.2016 09.10.2016 18.10.2016 23.10.2016 24.10.2016

17.10.2016 17.10.2016 31.10.2016 31.10.2016

Completed Completed Completed Completed Completed

2015_22-EEHC-SAG-L-00093

2015_22-EEHC_SAG-L-00093 Spare Parts Offer

Yes

29.10.2016

07.11.2016

Completed

2015_22-SAG-EEHC-L-00256; 2015_22-SAG-EEHC-L-00337; 2015_22-SAG-EEHC-L-00364

2015_22-EEHC-SAG-L-00094

2015_22-EEHC-SAG-L-00094 Nominee for PAC Pump Inspection 2015_22-EEHC_SAG-L-00095 Siemens Recommended Spare Parts for two years operation according to Vol.II Sec.0.9 2015_22-EEHC-SAG-L-00096 Certificates for Gas Pipe Line Cleanliness Re Documentation Quantities 2015_22-EEHC_SAG-L-00097 Handed Over Commissioning Documentations

Yes

31.10.2016

07.11.2016

Completed

2015_22-SAG-EEHC-L-00345; 2015_22-SAG-EEHC-L-00352

Yes No No Yes

06.11.2016 12.11.2016 17.11.2016 19.11.2016

14.11.2016

Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00344

2015_22-EEHC-SAG-L-00095 2015_22-EEHC-SAG-L-00096 2015_22-EEHC-SAG-E-00082 2015_22-EEHC-SAG-L-00097

10.08.2017

28.11.2016

2015_22-SAG-EEHC-L-00256; 2015_22-SAG-EEHC-L-00337; 2015_22-SAG-EEHC-L-00364

2015_22-SAG-EEHC-L-00339 2015_22-SAG-EEHC-L-00343

2015_22-SAG-EEHC-L-00353 2015_22-SAG-EEHC-L-00357

Page 3 of 4


Letter-No.(int.) 2015_22-EEHC-SAG-L-00098

Letter-No.(ext.)

Subject 2015_22-EEHC_SAG-L-00098 Difference of GTG Type 2015_22-EEHC_SAG-L-00099 Siemens AG Spare Parts Offer for BOP recommended for 2 years COMBINED CYCLE operation ‫أﻋﻣﺎل اﻟﻣﺳﺢ واﻟﺗطﮭﯾر‬ 2015_22-EEHC_SAG-L-00100 RE: Inspection call 11MB Gas Turbine

Reply Req. Corr. Date Yes 19.11.2016

Target Date 28.11.2016

Status Completed

Reference to 2015_22-SAG-EEHC-L-00368

Yes Yes No

29.11.2016 15.12.2016 08.01.2017

07.12.2016 22.12.2016

Completed Completed Completed

2015_22-SAG-EEHC-L-00333

Yes

11.01.2017

18.01.2017

Completed

2015_22-EEHC_SAG-L-00101 RE: Inspection call PAC pump Rev.1 2015_22-EEHC_SAG-L-00102 EETC Required Data for Units

No Yes

13.01.2017 14.01.2017

Completed Completed

2015_22-EEHC-SAG-L-00094; 2015_22-SAG-EEHC-L-00372

23.01.2017

2015_22-EEHC_SAG-L-00103 Protection of Transformers (3)

Yes

16.01.2017

23.01.2017

Completed

2015_22-EEHC-SAG-L-00013; 2015_22-SAG-EEHC-L-00054

FW: El Burullus / New Capital Combined Cycle Power Plants

No ‫ اﻋﻣﺎل ﺗطﮭﯾر ﻣﺎﺧذ وﻣﺧرج اﻟﺑرﻟس‬Yes

17.01.2017 23.01.2017

2015_22-EEHC-SAG-L-00099 2015_22-EEHC-SAG-E-00080 2015_22-EEHC-SAG-L-00100

2015_22-EEHC-SAG-L-00100

2015_22-EEHC-SAG-E-00081

Burullus Power Plant - Trip event BAT 41 Scanned from a Xerox Multifunction Printer

2015_22-EEHC-SAG-L-00101 2015_22-EEHC-SAG-L-00102 2015_22-EEHC-SAG-L-00103 2015_22-EEHC-SAG-E-00084 2015_22-EEHC-SAG-E-00086

Project: EG1019 MPR No.: 23

Correspondence List (Customer to SAG)

SIEMENS

El Burullus / New Capital Combined Cycle Power Plants Intake & Discharge mines scan

2015_22-SAG-EEHC-L-00366

30.01.2017

Completed Completed

2015_22-EEHC-SAG-L-00104

2015_22-EEHC_SAG-L-00104 RE: 3150 A GIS busducts for OHL feeders phase 2

Yes

29.01.2017

06.02.2017

Completed

2015_22-SAG-EEHC-L-00374; 2015_22-SAG-EEHC-L-00385

2015_22-EEHC-SAG-E-00085

2015-22-SAG-OC-EEHC-L-00374 3150 A GIS busduct for OHL Feeders Phase 2

Yes

09.02.2017

16.02.2017

Completed

2015_22-SAG-EEHC-L-00374; 2015_22-SAG-EEHC-L-00392

2015_22-EEHC-SAG-L-00105

2015_22-EEHC-SAG-L-00105 Nominee for LP Steam Turbine 30 Inspection

Yes

11.02.2017

20.02.2017

Completed

2015_22-SAG-EEHC-L-00379; 2015_22-SAG-EEHC-L-00391

2015_22-EEHC-SAG-L-00106

2015_22-EEHC_SAG-L-00106 3150A GIS busducts for OHL feeders phase 2(2)

Yes

18.02.2017

27.02.2017

Completed

2015_22-EEHC-SAG-L-00104; 2015_22-SAG-EEHC-L-00385; 2015_22-SAG-EEHC-L-00400

Yes

19.02.2017

24.02.2017

Completed

2015_22-SAG-OC_EEHC-L-00273; 2015_22-SAG-OC-L-00288

Yes Yes Yes Yes

26.02.2017 08.03.2017 15.03.2017 27.03.2017

06.03.2017 16.03.2017 22.03.2017 03.04.2017

Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00399; 2015_22-SAG-OC_EEHC-L-00280

Yes Yes No

27.03.2017 28.03.2017 29.03.2017

04.04.2017 05.04.2017

Completed Completed Completed

2015_22-SAG-EEHC-L-00405; 2015_22-SSM-OCSM_EEHC-L-00054 2015_22-SAG-OC_EEHC-L-00298

2015_22-EEHC-SAG-L-00111

2015_22-EEHC_SAG-L-00109 Re Readiness of 500 kV GIS Phase 2 Energization RRT for GTs 31, 32, 41 and 42 WG: EG10xx-SPO-EEHC-L-00033 Stand-by on the Fuel Gas Compressors 2015_22-EEHC_SAG-L-00111 Re Update ongoing investigations generator circuit breaker and main transformer of unit 41

Yes

03.04.2017

11.04.2017

Completed

2015_22-SAG-EEHC-L-00399; 2015_22-SAG-EEHC-L-00416

2015_22-EEHC-SAG-L-00110

2015_22-EEHC_SAG-L-00110 RTR Reiteration for Unit 31

Yes

04.04.2017

11.04.2017

Completed

2015_22-SAG-EEHC-L-00412; 2015_22-SAG-OC_EEHC-L-00286

2015_22-EEHC-SAG-L-00112

2015_22-EEHC_SAG-L-00112 Re: GT lift oil system

Yes

06.04.2017

14.04.2017

Completed

2015_22-EEHC-SAG-L-00110; 2015_22-SAG-EEHC-L-00412; 2015_22-SAG-EEHC-L-00413

2015_22-EEHC-SAG-E-00087 2015_22-EEHC_SAG-L-00107 Reports for Generator Circuit Breaker and Main Transformer of unit 41 Comments on Performance Test Procedures Gas Fuel Supply System-Redundancy Concept Burullus Project - Reliability Run for GTs 31,41 and 42

2015_22-EEHC-SAG-L-00107 2015_22-EEHC-SAG-E-00110 2015_22-EEHC-SAG-E-00111 2015_22-EEHC-SAG-E-00113 2015_22-EEHC-SAG-L-00109 2015_22-EEHC-SAG-E-00114 2015_22-EEHC-SAG-E-00115

10.08.2017

EG10xx-SPO-EEHC-L-00033

EG10xx-SPO-EEHC-L-00033 2015_22-EEHC_SSM-OCSM-L-00016

Page 4 of 4


Letter-No.(int.) 2015_22-SAG-EEHC-L-00131

Project: EG1019 MPR No.: 23

Correspondence List (SAG to Customer)

SIEMENS Subject water balance

Reply Req. Corr. Date No 27.01.2015

2015_22-SAG-EEHC-L-00001 2015_22-SAG-EEHC-L-00003 2015_22-SAG-EEHC-L-00004 2015_22-SAG-EEHC-L-00006 2015_22-SAG-EEHC-L-00002 2015_22-SAG-EEHC-L-00007 2015_22-SAG-EEHC-L-00010 2015_22-SAG-EEHC-L-00011 2015_22-SAG-EEHC-L-00016 2015_22-SAG-EEHC-L-00017 2015_22-SAG-EEHC-L-00020 2015_22-SAG-EEHC-L-00022 2015_22-SAG-EEHC-L-00009 2015_22-SAG-EEHC-L-00023 2015_22-SAG-EEHC-L-00026 2015_22-SAG-EEHC-L-00027 2015_22-SAG-EEHC-L-00028 2015_22-SAG-EEHC-L-00029 2015_22-SAG-EEHC-L-00030

Nomination of additional Sub-contractor Gas Turbine Systems - Enclosure 500kV GIS Switchyard - CT and VT calculation Required Data for Isolation Coordination Study Nomination of additional Sub-contractor Gas Turbine Systems - Battery Charger 500kV GIS Secondary System Documents Data of interconnected system 500kV Gas inlet data - re: meeting EEHC/GASCO/SAG Price Breakdown acc. to Appendix B1 of Contract Consortium Quality Manual Estimated gas consumption during commissioning Inspection and Test Plan, Gas Turbine 500kV-Gis 500 kV Outdoor Equipment Inspection Schedule Inspection and Test Plan, GT and DT transformer 500 kV switchgear, battery, charger, steel structures, overhead crane Agenda for GIS Meeting on Monday, 14.9.2015 500 kV GIS local control cubicle design

No Yes Yes No Yes Yes Yes No No No No No No Yes No No Yes No Yes

09.07.2015 13.07.2015 24.07.2015 27.07.2015 03.08.2015 05.08.2015 12.08.2015 19.08.2015 19.08.2015 20.08.2015 31.08.2015 01.09.2015 02.09.2015 02.09.2015 08.09.2015 10.09.2015 11.09.2015 11.09.2015 14.09.2015

2015_22-SAG-EEHC-L-00031 2015_22-SAG-EEHC-L-00032 2015_22-SAG-EEHC-L-00024 2015_22-SAG-EEHC-L-00035 2015_22-SAG-EEHC-L-00036 2015_22-SAG-EEHC-L-00037 2015_22-SAG-EEHC-L-00038 2015_22-SAG-EEHC-L-00040 2015_22-SAG-EEHC-L-00041 2015_22-SAG-EEHC-L-00042 2015_22-SAG-EEHC-L-00043

Minutes of Meeting, Approval of primary components 500 kV GIS, Protection panel front view Safety Design Concept Inspection and Test Plan, Steam Turbine HI and LP Telecommunication system DTS-0015, 0016 Temporary Coating of Heating Elements Retained remittance fees for 1st and 2nd advanced payment Appendix S Form notification - contact number for requirements department 500 kV switchgear, spare feeder bay =B23 Minutes of Meeting "Correspondance training - Fabasoft Cloud" on 2015-09-29 Inspection duration

No Yes No No Yes No Yes No Yes No No

14.09.2015 17.09.2015 18.09.2015 21.09.2015 23.09.2015 25.09.2015 30.09.2015 01.10.2015 02.10.2015 02.10.2015 05.10.2015

2015_22-SAG-EEHC-L-00044 2015_22-SAG-EEHC-L-00019

Secondary system, local control cubicle Contractual Clarification List Items 177 and 324 - Flow Measurements for Sulphur Heaters

Yes No

05.10.2015 08.10.2015

19.10.2015

Completed Completed

2015_22-SAG-EEHC-L-00045 2015_22-SAG-EEHC-L-00047 2015_22-SAG-EEHC-L-00048 2015_22-SAG-EEHC-L-00049 2015_22-SAG-EEHC-L-00056 2015_22-SAG-EEHC-L-00051 2015_22-SAG-EEHC-L-00033 2015_22-SAG-EEHC-L-00046 2015_22-SAG-EEHC-L-00052 2015_22-SAG-EEHC-L-00053 2015_22-SAG-EEHC-L-00054 2015_22-SAG-EEHC-L-00055 2015_22-SAG-EEHC-L-00057

Kone Crane Comments HV Equipment connection at Gantry Area SF6 to Air Bushing Specification 500kV GIS local control cubicle design Burullus Fishing Port - Transport Concept Assumptions for design Receiving Gantry 500 kV GIS, Telecommunication system 500KV switchgear, spare feeder bay = B23 Reminder Telecommunication, Letter 22-SAG-EEHC-L-00036 Nomination of additional suppliers Generator Transformer Monitoring 500kV Outdoor Equipment Re: Missed Transmittals and Correspondence

Yes Yes Yes Yes No Yes Yes Yes Yes Yes No Yes No

12.10.2015 13.10.2015 13.10.2015 13.10.2015 14.10.2015 15.10.2015 16.10.2015 16.10.2015 16.10.2015 16.10.2015 19.10.2015 19.10.2015 20.10.2015

19.10.2015 20.10.2015 20.10.2015 20.10.2015

Completed Completed Completed Completed Completed Completed Completed Sent Completed Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00058 2015_22-SAG-EEHC-L-00059

Clarification Supply of Sulphur Heaters Generator Monitoring

No No

20.10.2015 21.10.2015

Yes Yes No

22.10.2015 22.10.2015 22.10.2015

No Yes Yes

27.10.2015 28.10.2015 28.10.2015

2015_22-SAG-EEHC-L-00061 2015_22-SAG-EEHC-L-00062 2015_22-SAG-EEHC-L-00063 2015_22-SAG-EEHC-E-00001 2015_22-SAG-EEHC-L-00066 2015_22-SAG-EEHC-L-00067

10.08.2017

Letter-No.(ext.)

Comment to Client letter 2015_22-EEHC-SAG-L-0002, Battery and UPS, Specification Lead acid battery (DTS0055) Secondary system, local control cubicle Secondary interface 500 kV switchgear - power plant Re: EG1019 PM 2015_22-SAG-EEHC-L-00061 Comment to Client letter 2015_22-EEHC-SAG-L0002, Battery and UPS, Specification Lead acid battery (DTS0055) AC_DC Distribution Single lines, AC load Calculation 500 KV GIS local control cubicle design, Special tools

Target Date

20.07.2015 07.08.2015 17.08.2015 19.08.2015 26.08.2015

09.09.2015

25.09.2015 28.09.2015

01.10.2015

30.09.2015 07.10.2015 09.10.2015

22.10.2015 22.10.2015 22.10.2015 21.10.2015 29.10.2015 22.10.2015

Status Completed Completed Completed Completed Completed Sent Completed Completed Completed Completed Completed Completed Completed Completed Sent Completed Completed Completed Completed Completed Completed Sent Completed Completed Completed Completed Sent Completed Completed Completed Completed

Completed Completed

30.10.2015 29.10.2015

04.11.2015 04.11.2015

Completed Sent Completed Completed Sent Sent

Reference to 2015_22-EEHC-SAG-L-00034

2015_22-SAG-EEHC-L-00100

2015_22-SAG-EEHC-L-00017 2015_22-SAG-EEHC-L-00016

2015_22-EEHC-SAG-L-00001; 2015_22-SAG-EEHC-L-00055 2015_22-SAG-EEHC-L-00230 2015_22-SAG-EEHC-L-00052

2015_22-EEHC-SAG-L-00005 2015_22-EEHC-SAG-L-00002; 2015_22-SAG-EEHC-L-00061 2015_22-SAG-EEHC-L-00058 2015_22-EEHC-SAG-L-00002; 2015_22-SAG-EEHC-L-00061

2015_22-EEHC-SAG-L-00004 2015_22_EEHC_SAG-OC-L-00020

2015_22-EEHC-SAG-L-00006 2015_22-SAG-EEHC-L-00036 2015_22-EEHC-SAG-E-00008 2015_22-SAG-EEHC-L-00031 2015_22_EEHC_SAG-OC-E-00026 2015_22-EEHC-SAG-E-00006; 2015_22-SAG-EEHC-L-00019 2015_22-EEHC-SAG-E-00008 2015_22-EEHC-SAG-L-00002; 2015_22-SAG-EEHC-L-00044; 2015_22-SAG-EEHC-L-00045 2015_22-EEHC-SAG-L-00007

2015_22-EEHC-SAG-E-00009 2015_22-EEHC-SAG-T-000002 2015_22-EEHC-SAG-L-00010

Page 1 of 6


Letter-No.(int.) 2015_22-SAG-EEHC-L-00050 2015_22-SAG-EEHC-L-00065

Project: EG1019 MPR No.: 23

Correspondence List (SAG to Customer)

SIEMENS

Subject Inspection Schedule, update Inspection and Test Plan concerning Exhaust System

Reply Req. Corr. Date No 29.10.2015 Yes 29.10.2015

Target Date

2015_22-SAG-EEHC-L-00068 2015_22-SAG-EEHC-L-00069 2015_22-SAG-EEHC-L-00070 2015_22-SAG-EEHC-L-00071 2015_22-SAG-EEHC-L-00072

HV Equipment connection at Gantry Area, Reference lists Line Traps technical Data; DTS0059 Nomination of additional supplier Furniture for Central Control Room (CCR) Shipper`s own Container - Ownership Structures

Yes Yes Yes No Yes

29.10.2015 30.10.2015 30.10.2015 02.11.2015 03.11.2015

05.11.2015 06.11.2015 06.11.2015 11.11.2015

Completed Sent Completed Completed Completed

2015_22-SAG-EEHC-L-00073 2015_22-SAG-EEHC-L-00106 2015_22-SAG-EEHC-L-00074

Yes Yes Yes

03.11.2015 03.11.2015 04.11.2015

10.11.2015 17.12.2015 06.11.2015

Sent Sent Completed

2015_22-SAG-EEHC-L-00075 2015_22-SAG-EEHC-L-00076 2015_22-SAG-EEHC-L-00077 2015_22-SAG-EEHC-L-00078 2015_22-SAG-EEHC-L-00080 2015_22-SAG-EEHC-L-00082 2015_22-SAG-EEHC-L-00083 2015_22-SAG-EEHC-L-00084 2015_22-SAG-EEHC-L-00085 2015_22-SAG-EEHC-L-00086 2015_22-SAG-EEHC-L-00087

HV Equipment connection at Gantry Area, Reference List Tension Insulator Inspection and Test Plan concerning Exhaust System Assumptions for the design of the receiving gantry for Burullus PP Project Inspection and Test Plan concerning Exhaust System, Meeting with Eng. Fathy Moussa and Generator Expert Inspection Call for Gas Turbine Unit 31, Rotor Balancing, preliminary date Country of Origin HRSG Material Air intake filter clarifications Feeder =B23, local control cubuicle and secondary systems Generator Transformer Monitoring Generator rotor removal concept Electrical Single Line Diagram ITP Meeting HV Outdoor Equipment, Post Insulator Retained remittance fees for 1st and 2nd advance payment invoice

Yes Yes No No Yes No No No No Yes Yes

04.11.2015 05.11.2015 05.11.2015 10.11.2015 10.11.2015 12.11.2015 12.11.2015 12.11.2015 13.11.2015 13.11.2015 13.11.2015

11.11.2015 12.11.2015

Completed Sent Completed Completed Completed Completed Completed Completed Completed Completed Sent

2015_22-SAG-EEHC-L-00088

Assumptions for design of receiving Gantry

No

13.11.2015

2015_22-SAG-EEHC-L-00089 2015_22-SAG-EEHC-L-00091 2015_22-SAG-EEHC-L-00093 2015_22-SAG-EEHC-L-00094 2015_22-SAG-EEHC-L-00095 2015_22-SAG-EEHC-L-00096 2015_22-SAG-EEHC-L-00097 2015_22-SAG-EEHC-L-00092

Assumptions for design receiving Gantry Rev A 230VAC Inverter changed to Dual parallel redundant Nomination of new supplier Inspection Calls for HRSG Modules, Vessels Assumptions for design receiving gantry Rev A Experience list and certificates supplier Südkabel Local Control Cubicles, Approval Inspection and Test Plan for Generator and Generator Circuit Breaker, Inspection Schedule

Yes Yes No No Yes Yes No Yes

16.11.2015 16.11.2015 16.11.2015 16.11.2015 17.11.2015 18.11.2015 19.11.2015 23.11.2015

2015_22-SAG-EEHC-L-00098 2015_22-SAG-EEHC-L-00099 2015_22-SAG-EEHC-L-00100 2015_22-SAG-EEHC-L-00101 2015_22-SAG-EEHC-L-00102 2015_22-SAG-EEHC-L-00104 2015_22-SAG-EEHC-L-00105

Agenda Pre-Inspection Meeting of HRSG Modules, Vessels 500 kV GIS, Spare feeder bay =B23 Required Data for Isolation Coordination Study Laydown area for generator rotor Generator Transformer Monitoring Deemed approval of additional suppliers Re: Owner Required Letters

No No Yes No No No No

23.11.2015 24.11.2015 25.11.2015 25.11.2015 25.11.2015 25.11.2015 26.11.2015

2015_22-SAG-EEHC-L-00108 2015_22-SAG-EEHC-L-00109 2015_22-SAG-EEHC-L-00110 2015_22-SAG-EEHC-L-00090 2015_22-SAG-EEHC-L-00114 2015_22-SAG-EEHC-L-00115 2015_22-SAG-EEHC-L-00116 2015_22-SAG-EEHC-L-00117 2015_22-SAG-EEHC-L-00118 2015_22-SAG-EEHC-L-00103 2015_22-SAG-EEHC-L-00119 2015_22-SAG-EEHC-L-00120 2015_22-SAG-EEHC-L-00121 2015_22-SAG-EEHC-L-00122 2015_22-SAG-EEHC-L-00123

2015_22-SAG-EEHC-L-00108 Inspection Call for Gas Turbine Unit 31, Rotor Balancing, final date 11kV Commissioning power details Telecommunication Reply to Comments Base Design SCS Central Panels Design Criteria Receiving Gantry Base Design BCU Panels Comments to Electrical Single Line Diagram Nomination of additional supplier Answer to question regarding EEHC-SAG -L-00026 Air intake filter clarifications 2015_22-SAG-EEHC-L-00103 Invitation for FAT 500kV GIS, LCC and Surge Arrestors Nomination of additional supplier Water balance Protection Panels for Generator and Steam Turbine Connecting Burullus and New Capital 500kV Data for insulation coordination study

Yes No No Yes No No No Yes No Yes No No Yes Yes No

29.11.2015 01.12.2015 01.12.2015 04.12.2015 04.12.2015 04.12.2015 07.12.2015 07.12.2015 07.12.2015 08.12.2015 08.12.2015 09.12.2015 10.12.2015 10.12.2015 10.12.2015

2015_22-SAG-EEHC-L-00124

Cable Trays Specification, Overhead line conductor specification

No

10.12.2015

10.08.2017

Letter-No.(ext.)

04.11.2015

24.11.2015

20.11.2015 20.11.2015

Status Completed Completed

Completed

23.11.2015 23.11.2015

24.11.2015 22.11.2015 07.12.2015

09.12.2015

11.12.2015

10.12.2015

13.12.2015 20.12.2015

17.12.2015 16.12.2015

Completed Sent Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Sent Completed Completed Sent Completed Completed Completed Completed Completed Completed Completed Completed Completed Sent Completed

Reference to 2015_22-EEHC-SAG-T-000001 2015_22-EEHC-SAG-L-00009; 2015_22-SAG-EEHC-L-00073

2015_22-EEHC-SAG-L-00009; 2015_22-SAG-EEHC-L-00068 2015_22-EEHC-SAG-T-000001 2015_22-EEHC-SAG-E-00036 2015_22-EEHC-SAG-E-00013

2015_22-SAG-EEHC-L-00242 2015_22-EEHC-SAG-L-00012 2015_22-EEHC-SAG-L-00013 2015_22-EEHC-SAG-T-000003 2015_22-EEHC-SAG-L-00016

2015_22-EEHC-SAG-E-00038; 2015_22-SAG-EEHC-L-00089 2015_22-EEHC-SAG-E-00038; 2015_22-SAG-EEHC-L-00088; 2015_22-SAG-EEHC-L-00095

2015_22-SAG-EEHC-L-00089 2015_22-EEHC-SAG-L-00021 2015_22-EEHC-SAG-T-000004

2015_22-EEHC-SAG-L-00023 2015_22-SAG-EEHC-L-00004 2015_22-EEHC-SAG-L-00018 2015_22-EEHC-SAG-L-00020 2015_22-EEHC-SAG-L-00019

2015_22-EEHC-SAG-L-00024

2015_22-EEHC-SAG-L-00025 2015_22-EEHC-SAG-L-00026 2015_22-EEHC-SAG-L-00031 2015_22-EEHC-SAG-T-000005 2015_22-EEHC-SAG-E-00040 2015_22-EEHC-SAG-E-00041

Completed

Page 2 of 6


Letter-No.(int.) 2015_22-SAG-EEHC-L-00126 2015_22-SAG-EEHC-L-00127 2015_22-SAG-EEHC-L-00125 2015_22-SAG-EEHC-L-00130 2015_22-SAG-EEHC-L-00132 2015_22-SAG-EEHC-L-00128 2015_22-SAG-EEHC-L-00129 2015_22-SAG-EEHC-L-00133 2015_22-SAG-EEHC-L-00134 2015_22-SAG-EEHC-L-00135 2015_22-SAG-EEHC-L-00136 2015_22-SAG-EEHC-L-00137 2015_22-SAG-EEHC-L-00140 2015_22-SAG-EEHC-L-00141 2015_22-SAG-EEHC-L-00142 2015_22-SAG-EEHC-L-00143 2015_22-SAG-EEHC-L-00144 2015_22-SAG-EEHC-L-00146 2015_22-SAG-EEHC-L-00147 2015_22-SAG-EEHC-L-00148 2015_22-SAG-EEHC-L-00149 2015_22-SAG-EEHC-L-00150 2015_22-SAG-EEHC-L-00145 2015_22-SAG-EEHC-L-00151 2015_22-SAG-EEHC-L-00152 2015_22-SAG-EEHC-L-00153 2015_22-SAG-EEHC-L-00154 2015_22-SAG-EEHC-L-00155 2015_22-SAG-EEHC-L-00156 2015_22-SAG-EEHC-L-00157 2015_22-SAG-EEHC-L-00158 2015_22-SAG-EEHC-L-00159 2015_22-SAG-EEHC-L-00160 2015_22-SAG-EEHC-L-00161 2015_22-SAG-EEHC-L-00162 2015_22-SAG-EEHC-L-00163 2015_22-SAG-EEHC-L-00164 2015_22-SAG-EEHC-L-00165 2015_22-SAG-EEHC-L-00166 2015_22-SAG-EEHC-L-00167 2015_22-SAG-EEHC-L-00168 2015_22-SAG-EEHC-L-00169 2015_22-SAG-EEHC-L-00170 2015_22-SAG-EEHC-L-00173 2015_22-SAG-EEHC-L-00174 2015_22-SAG-EEHC-L-00175 2015_22-SAG-EEHC-L-00177 2015_22-SAG-EEHC-L-00178 2015_22-SAG-EEHC-L-00180 2015_22-SAG-EEHC-L-00182 2015_22-SAG-EEHC-L-00184 2015_22-SAG-EEHC-L-00185 2015_22-SAG-EEHC-L-00186 2015_22-SAG-EEHC-L-00176 2015_22-SAG-EEHC-L-00187 2015_22-SAG-EEHC-L-00188 2015_22-SAG-EEHC-L-00368 2015_22-SAG-EEHC-L-00190 2015_22-SAG-EEHC-L-00189

10.08.2017

Project: EG1019 MPR No.: 23

Correspondence List (SAG to Customer)

SIEMENS Letter-No.(ext.)

Subject 500 kV GIS, Spare feeder bay =B23 Nomination of new supplier Inspection call CCVT and CVT, 500kV Inspection Call, Geno Unit 41 preliminary, gas turbine 31 prel, Invitation for Surge Arrestors Inspection Schedule Inspection Calls for HRSG Modules, Vessels, confirmed dates Inspection call, auxiliary transformer BBT prel, HRSG non pressure part - PIM 2015_22- EEHC-SAG -T-000014 I&C DCS Cabinet Overview BCU and HMI Typical screen pictures RE: EEHC-SAG -T-000007 IEEE AVR / PSS Model Descriptions Invitation Letters for FAT Surge Arrestors Berlin Telecommunication, DPL2 values Nomination of additional supplier - VAM Enduser certificate for ethernet routers Generators and Unit Transformers Ratings Inspection notification, Geno 41 final, diverter damper prel, SCS and DCS Signal list Inspection notification, BAT prel, HRSG main steel - pre inspection meetin final, Fuel Gas Analysis for the Performance Tests SCS Functional Design Specification ITP Battery Chargers and Inverter Re Issues of debate

Reply Req. No No Yes Yes No Yes No Yes No Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes No No No

Corr. Date 11.12.2015 14.12.2015 15.12.2015 18.12.2015 21.12.2015 22.12.2015 22.12.2015 22.12.2015 22.12.2015 22.12.2015 22.12.2015 23.12.2015 04.01.2016 04.01.2016 05.01.2016 06.01.2016 07.01.2016 08.01.2016 08.01.2016 11.01.2016 11.01.2016 11.01.2016 12.01.2016

Target Date

Spare Part List BoP (SAG scope of delivery) EETC 500 kV Transmission Lines Projects Frequency bandwidth for Burullus DPLC1 and DPLC2 Inspection call, Gasturbine 31 update prel, main transformer final, RE: P&IDs for Fuel Gas System and Fuel Gas Compressor Gas turbine rotor de-stacking Nomination of additional suppliers Inspection and Test Plan concerning SFC-SEE equipment Deemed approval of new Subcontractor Inspection Call, main transformer 41/42 prel Inspection Schedule P&IDs Water/Steam Cycle and Cooling Change in Rating from 2000A to 3150A for the overhead line Reply Protection Panels for Generator and Steam Turbine Inspection call, GIS, Battery charger & inverter, SCS & BCP, auxiliary transformer 41,42 final Auxiliary system P&IDs for GHC, GM and QFB Inspection call, bypass stack prel, P&IDs Water-Steam cycle and Cooling water systems EETC 500 kV Transmission Lines Projects Inspection call, Geno 42 prel P&IDs watersteam cycle and cooling water systems Reply SCS Properties Inspection call, MV Switchgear final Inspection call, Geno 32 prel Inspection and Test Plan for battery Inspection schedule, update DCS signal list to load dispatch center SF6 Air Bushing Specification 3150A P&lDs for Fuel Gas system and Fuel Gas Compressor Inspection call, MV switchgear 42BBA final, LV Swichgear 00BHA final, LV transformer 00BHT final and 42BFT final Inspection and Test Plan concerning Feed water pump and HRSG Inspection call, diverter damper 41 prel, GIS Telecom (DPLC/Teleprotection) prel, GIS Telecom (SDH/MUX) prel, Fuel gas analysis reply 2015_22-EEHC_SAG-L-00098 Difference of GTG Type Inspection call, Geno 32 final, main transfomer 41+42 prel, auxiliary transformer 31+32 prel Inspection Call Generator Unit 31/42 - Preliminary

No No Yes Yes No No Yes No No Yes No No No No Yes Yes Yes Yes Yes Yes No No Yes Yes No No Yes Yes No

12.01.2016 12.01.2016 12.01.2016 12.01.2016 13.01.2016 13.01.2016 13.01.2016 13.01.2016 14.01.2016 14.01.2016 14.01.2016 14.01.2016 14.01.2016 15.01.2016 18.01.2016 18.01.2016 19.01.2016 19.01.2016 19.01.2016 20.01.2016 22.01.2016 26.01.2016 26.01.2016 27.01.2016 27.01.2016 28.01.2016 29.01.2016 29.01.2016 29.01.2016

Yes No

01.02.2016 02.02.2016

08.02.2016

Yes Yes No Yes Yes

02.02.2016 02.02.2016 02.02.2016 04.02.2016 05.02.2016

08.02.2016 09.02.2016

22.12.2015 25.12.2015 30.12.2015 29.12.2015 29.12.2015 30.12.2015 11.01.2016 11.01.2016 12.01.2016 13.01.2016 14.01.2016 15.01.2016 15.01.2016 18.01.2016

19.01.2016 19.01.2016

19.01.2016

21.01.2016

25.01.2016 08.03.2016 26.01.2016 23.02.2016 26.01.2016 25.01.2016

02.02.2016 03.02.2016

05.02.2016 05.02.2016

11.02.2016 12.02.2016

Status Completed Completed Completed Sent Completed Sent Completed Sent Completed Completed Completed Completed Sent Sent Sent Sent Sent Sent Sent Sent Completed Completed Completed Completed Completed Sent Sent Completed Completed Completed Completed Completed Sent Completed Completed Completed Completed Sent Sent Sent Sent Sent Sent Completed Completed Sent Sent Completed Completed Sent Completed Completed Sent Completed Sent Sent Completed Sent Sent

Reference to 2015_22-EEHC-SAG-L-00028

2015_22-EEHC-SAG-L-00035 2015_22-EEHC-SAG-L-00030

2015_22-EEHC-SAG-T-000014 2015_22-EEHC-SAG-T-000007 2015_22-EEHC-SAG-E-00053 2015_22-EEHC-SAG-E-00052 2015_22-SAG-EEHC-L-00159

2015_22-SAG-EEHC-L-00196

2015_22-EEHC-SAG-L-00039 2015_22_EEHC_SAG-OC-L-00057; 2015_22-OC_EEHC-L-00058 2015_22-SAG-EEHC-L-00169 2015_22-EEHC-SAG-E-00052 2015_22-EEHC-SAG-T-000012

2015_22-EEHC-SAG-T-000011 2015_22-SAG-EEHC-L-00141 2015_22-EEHC-SAG-L-00037 2015_22-EEHC-SAG-T-000017 2015_22-EEHC-SAG-L-00036 2015_22-EEHC-SAG-T-000013 2015_22-EEHC-SAG-T-000016 2015_22-SAG-EEHC-L-00152 2015_22-EEHC-SAG-T-000020 2015_22-EEHC-SAG-L-00044

2015_22-EEHC-SAG-T-000010 2015_22-EEHC-SAG-L-00040 2015_22-EEHC-SAG-L-00043

2015_22-EEHC-SAG-T-000018

2015_22-EEHC-SAG-L-00098

Page 3 of 6


Letter-No.(int.) 2015_22-SAG-EEHC-L-00191 2015_22-SAG-EEHC-L-00192 2015_22-SAG-EEHC-L-00193 2015_22-SAG-EEHC-L-00197 2015_22-SAG-EEHC-L-00199 2015_22-SAG-EEHC-L-00200 2015_22-SAG-EEHC-L-00172 2015_22-SAG-EEHC-L-00204 2015_22-SAG-EEHC-L-00205 2015_22-SAG-EEHC-L-00194 2015_22-SAG-EEHC-L-00183 2015_22-SAG-EEHC-L-00202 2015_22-SAG-EEHC-L-00208 2015_22-SAG-EEHC-L-00210 2015_22-SAG-EEHC-L-00196 2015_22-SAG-EEHC-L-00207 2015_22-SAG-EEHC-L-00211 2015_22-SAG-EEHC-L-00212 2015_22-SAG-EEHC-L-00213 2015_22-SAG-EEHC-L-00214 2015_22-SAG-EEHC-L-00217 2015_22-SAG-EEHC-L-00218 2015_22-SAG-EEHC-L-00220 2015_22-SAG-EEHC-L-00221 2015_22-SAG-EEHC-L-00223 2015_22-SAG-EEHC-L-00224 2015_22-SAG-EEHC-L-00225 2015_22-SAG-EEHC-L-00227 2015_22-SAG-EEHC-L-00228 2015_22-SAG-EEHC-L-00206 2015_22-SAG-EEHC-L-00229 2015_22-SAG-EEHC-L-00230 2015_22-SAG-EEHC-L-00231 2015_22-SAG-EEHC-L-00226 2015_22-SAG-EEHC-L-00232 2015_22-SAG-EEHC-L-00234 2015_22-SAG-EEHC-L-00236 2015_22-SAG-EEHC-L-00235 2015_22-SAG-EEHC-L-00203 2015_22-SAG-EEHC-L-00241

Project: EG1019 MPR No.: 23

Correspondence List (SAG to Customer)

SIEMENS Letter-No.(ext.)

Subject Water Steam Cycle Meeting Summary Line Traps, Change of Blocking Bandwidth Inspection Invitation Bypass unit 42 - Final Inspection Inspection call, MV switchgear 31-32 final, Geno 32 prel Minutes of Meeting 160216, signal list, overhead line feeders Fuel Oil Analysis Data Sheet Piping and Instrumentation Diagram (P&ID) of HRSG P&IDs for Fuel Gas system and Fuel Gas Compressor Gland steam condenser SCS functional design specification Clarification concerning Emergency Diesel Concept - Technical Meeting on 17.02.2016 Fire Figthing System P&ID Inspection call, bypass 41 prel reply: 2015_22- EEHC-SAG -T-000015 GTG OEMs documents (Part 1) fuel gas analysis for the performance tests Forward notification for EEHC-SAG-T-000022 SCS Commination Base Design Rev A, SCS Functional Design Rev A Change of Band Width for Line Traps Protection settings template Actual Drawings for CVT and CCVT General Alarm Panel Rev B Aviation warning light system for HRSG Inspection call, BTA battery prel., MBR damper 31 prel, Inspection call, HRSG modules - hydro- prel, bypass 32 prel Inspection call, Generator circuit breaker 42-41-32-31 preliminary 500 kV overhead line connections, meeting 4.4.2016 Actual Signal Lists re: 2015_22-EEHC-SAG-E-00070: Estimated Gas Consumption during Commissioning Re: Fuel Gas analysis Inspection Notification of reduced amount of inspection Re Diesel Generator Concept Safety Design Concept Exhaust Bypass Stack GA drawing, P&ID, Signal RE: SGC Fire Fire Fighting System P&ID

Reply Req. Yes No Yes Yes Yes Yes No No No No Yes No Yes No Yes No No No No No No Yes Yes Yes Yes No No No Yes No Yes No No No

Corr. Date 07.02.2016 09.02.2016 09.02.2016 16.02.2016 18.02.2016 18.02.2016 22.02.2016 24.02.2016 24.02.2016 25.02.2016 29.02.2016 29.02.2016 01.03.2016 04.03.2016 07.03.2016 07.03.2016 10.03.2016 10.03.2016 10.03.2016 10.03.2016 14.03.2016 22.03.2016 24.03.2016 24.03.2016 29.03.2016 30.03.2016 30.03.2016 01.04.2016 01.04.2016 05.04.2016 05.04.2016 06.04.2016 06.04.2016 08.04.2016

2015_22-EEHC-SAG-L-00046 Air intake filter clarifications Minutes of Meeting 4.4.2016, 500 kV overhead line connections, back energizing 500kV Overheadline/ Loadforecast for Commissioning Diesel Generator Concept Water Steam Cycle - PAC pump documents Burullus change in key personal Siemens site manager

No Yes No No No No

08.04.2016 08.04.2016 15.04.2016 18.04.2016 26.04.2016 26.04.2016

Target Date 08.03.2016 16.02.2016 23.02.2016 25.02.2016 25.02.2016

10.03.2016 08.03.2016 14.03.2016

29.03.2016 31.03.2016 31.03.2016 05.04.2016

18.04.2016 12.04.2016

15.04.2016

2015_22-SAG-EEHC-L-00242 2015_22-SAG-EEHC-L-00243 2015_22-SAG-EEHC-L-00244 2015_22-SAG-EEHC-L-00245 2015_22-SAG-EEHC-L-00247

Reply: Air Intake Filter Clarifications 2 NECC letter, signal list Starting System Transformers Shipment Eye Wash for Battery Room - Clarification item 227 500 kV network configuration

No Yes Yes Yes Yes

27.04.2016 28.04.2016 04.05.2016 06.05.2016 13.05.2016

2015_22-SAG-EEHC-L-00250 2015_22-SAG-EEHC-L-00251 2015_22-SAG-EEHC-L-00252 2015_22-SAG-EEHC-L-00253 2015_22-SAG-EEHC-L-00254

Factory Tests Water Steam Cycle-PAC pump documents Inspection schedule, Inspection call gas turbine Signal list, meeting with NECC Meeting on network configuration, telecommunication

Yes No Yes Yes Yes

20.05.2016 25.05.2016 01.06.2016 01.06.2016 01.06.2016

27.05.2016

2015_22-SAG-EEHC-L-00256 2015_22-SAG-EEHC-L-00258 2015_22-SAG-EEHC-L-00259 2015_22-SAG-EEHC-L-00260 2015_22-SAG-EEHC-L-00261 2015_22-SAG-EEHC-L-00233 2015_22-SAG-EEHC-L-00262

Spare Parts Offer Inspection call final acceptance XKA, Inspecton schedule Inspection Call for Gas Turbine 21 Notice of Force Majeure - Indonesian Factory Strike QST Documents RE: GT OEMs Documents (Part1) Nominees for Factory Tests

Yes Yes No No No No No

06.06.2016 13.06.2016 14.06.2016 14.06.2016 15.06.2016 17.06.2016 17.06.2016

20.06.2016 20.06.2016

10.08.2017

15.05.2016 06.05.2016 20.05.2016 30.05.2016

08.06.2016 08.06.2016 08.06.2016

Status Completed Completed Sent Sent Sent Sent Completed Completed Completed Completed Sent Completed Sent Completed Completed Completed Completed Completed Completed Completed Completed Sent Sent Sent Sent Completed Completed Completed Sent Completed Sent Completed Completed Completed Completed Sent Completed Completed Completed Completed

Completed Sent Completed Sent Sent Sent Completed Sent Sent Sent Completed Sent Completed Completed Completed Completed Completed

Reference to 2015_22-EEHC-SAG-L-00045

2015_22-EEHC-SAG-T-000019 2015_22-EEHC-SAG-L-00050 2015_22-EEHC-SAG-T-000021 2015_22-EEHC-SAG-L-00042 2015_22-EEHC-SAG-T-000023 2015_22-EEHC-SAG-T-000015 2015_22-SAG-EEHC-L-00148 2015_22-EEHC-SAG-T-000022

2015_22-SAG-OC_EEHC-L-00152

2015_22-EEHC-SAG-E-00070 2015_22-EEHC-SAG-L-00047 2015_22-SAG-OC_EEHC-L-00123 2015_22-EEHC-SAG-L-00054 2015_22-SAG-EEHC-L-00024 2015_22-EEHC-SAG-T-000009 2015_22-EEHC-SAG-L-00055 2015_22-EEHC-SAG-L-00046; 2015_22-SAG-EEHC-L-00242

2015_22-EEHC-SAG-L-00058 2015_22-EEHC-SAG-L-00048 2015_22-EEHC-SAG-L-00059; 2015_22-SAG-EEHC-L-00078; 2015_22-SAG-EEHC-L-00232 2015_22-EEHC-SAG-L-00063

2015_22_EEHC_SAG-OC-L-00145; 2015_22-SAG-EEHC-L-00252 2015_22-EEHC-SAG-L-00061 2015_22-SAG-EEHC-L-00250 2015_22-EEHC-SAG-L-00065 2015_22-SAG-EEHC-L-00299; 2015_22-SAG-EEHC-L-00364 2015_22-EEHC-SAG-L-00068 2015_22-EEHC-SAG-L-00069 2015_22-EEHC-SAG-L-00057 2015_22-EEHC-SAG-L-00066

Page 4 of 6


Letter-No.(int.)

Project: EG1019 MPR No.: 23

Correspondence List (SAG to Customer)

SIEMENS Subject

Reply Req. Corr. Date

2015_22-SAG-EEHC-L-00263 2015_22-SAG-EEHC-L-00265 2015_22-SAG-EEHC-L-00266 2015_22-SAG-EEHC-L-00269 2015_22-SAG-EEHC-L-00264 2015_22-SAG-EEHC-L-00270 2015_22-SAG-EEHC-L-00272 2015_22-SAG-EEHC-L-00274 2015_22-SAG-EEHC-L-00275 2015_22-SAG-EEHC-L-00280 2015_22-SAG-EEHC-L-00282

RE: 2015_22-EEHC-SAG-T-000024 P&I Diagram Instrument Air System Unit 42 Inspection schedule, Inspection call gas turbine - update Factory Inspection, Visa application Insepction call, XKA Emergency Diesel Generator Documentation Quantities Inspection call, gas turbine Temporary setting of distance relays Burulls - Abu Quir Signal list, protection signals Steam Turbine Crane Fire and Explosion Protection Concept Setting of protection relays for outgoing circuits

No No No No Yes No No Yes No No Yes

17.06.2016 21.06.2016 22.06.2016 24.06.2016 27.06.2016 27.06.2016 27.06.2016 27.06.2016 29.06.2016 07.07.2016 07.07.2016

2015_22-SAG-EEHC-L-00278 2015_22-SAG-EEHC-L-00283 2015_22-SAG-EEHC-L-00276 2015_22-SAG-EEHC-L-00285

Connection and telecommunication for 500 kV GIS equipment Burullus Inspection call, 21 BBT Aux Transformer, 20MKA Generator Factory Inspection Test_Travel Arrangements Inspection call, final, gas turbine, emergency diesel

Yes No Yes No

08.07.2016 11.07.2016 12.07.2016 18.07.2016

2015_22-SAG-EEHC-L-00284 2015_22-SAG-EEHC-L-00286 2015_22-SAG-EEHC-L-00287 2015_22-SAG-EEHC-L-00288

Inspection call, 21BBT Auxiliary Transformer, invitation letters Notice of Force Majeure - Typhoons in Asia Inspection call, PCC, Inspection schedule Notice of Force Majeure - Floods in China

No No No No

19.07.2016 19.07.2016 20.07.2016 20.07.2016

Completed Completed Completed Completed

2015_22-SAG-EEHC-L-00290 2015_22-SAG-EEHC-L-00291 2015_22-SAG-EEHC-L-00292 2015_22-SAG-EEHC-L-00294 2015_22-SAG-EEHC-L-00295 2015_22-SAG-EEHC-L-00297

Inspection call, aux. transformer BBT, inspection schedule, invitation letters PCC Social Insurance Invitation letters for 21BBT Auxiliary Transformer Generator protection signals for NECC Notice of Force Majeure - Coup Attempt in Turkey HV grid connection

No Yes No No No Yes

21.07.2016 22.07.2016 26.07.2016 29.07.2016 03.08.2016 04.08.2016

11.08.2016

Completed Sent Completed Completed Completed Sent

2015_22-SAG-EEHC-L-00299 2015_22-SAG-EEHC-L-00302

Spare Parts Offer Permission to export fuel gas sample bottle

No Yes

05.08.2016 09.08.2016

23.08.2016

Completed Sent

2015_22-SAG-EEHC-L-00268 2015_22-SAG-EEHC-L-00293 2015_22-SAG-EEHC-L-00303 2015_22-SAG-EEHC-L-00304 2015_22-SAG-EEHC-L-00307 2015_22-SAG-EEHC-L-00309 2015_22-SAG-EEHC-L-00296 2015_22-SAG-EEHC-L-00313

Gantry construction required for the 500kV Burullus/ Samanoid Transmission line Fire and Explosion Protection Concept Invoice Documentation Gas Pressure Reducing Station Parameters for SCS System Inspection call, Geno 20MKA, revision1 Response to Letter 2015_22_EEHC-SAG-L-00081 Vibration Protection Inspection call 20MKA, Generator, update

No No No Yes No No No No

10.08.2016 10.08.2016 18.08.2016 19.08.2016 24.08.2016 25.08.2016 31.08.2016 02.09.2016

2015_22-SAG-EEHC-L-00314 2015_22-SAG-EEHC-L-00315 2015_22-SAG-EEHC-L-00317

MoM Connection and Telecommunication for 500kV GIS Burullus Absence of General Project Manager Re: Collective Notes - general layout/ air intake

Yes No No

06.09.2016 08.09.2016 09.09.2016

2015_22-SAG-EEHC-L-00318 2015_22-SAG-EEHC-L-00319 2015_22-SAG-EEHC-L-00321 2015_22-SAG-EEHC-L-00322

Re - Collective Notes - single line diagram for generator and transformer protection Re - Collective Notes - distance between cable trays XKA, test report for witness test Re: Collective Notes - Access to roofs for maintenance

No No No No

09.09.2016 09.09.2016 09.09.2016 09.09.2016

2015_22-SAG-EEHC-L-00325 2015_22-SAG-EEHC-L-00327 2015_22-SAG-EEHC-L-00329

Inspection call, 10BAT main transformer, update schedule Telecommunication, protection relay settings Re - collective notes - cable tray distance in GIS building

Yes No No

22.09.2016 22.09.2016 26.09.2016

2015_22-SAG-EEHC-L-00333 2015_22-SAG-EEHC-L-00334

Siemens AG Spare Parts Offer for BOP recommended for 2 years COMBINED CYCLE operation Fuel consumption during commissioning

No No

06.10.2016 06.10.2016

2015_22-SAG-EEHC-L-00337 2015_22-SAG-EEHC-L-00330 2015_22-SAG-EEHC-L-00339

Spare Parts Offer Permission to export fuel gas sample bottle Inspecion call, revision transformer BAT, PAC pump, update inspection schedule

Yes Yes No

13.10.2016 14.10.2016 17.10.2016

10.08.2017

Letter-No.(ext.)

Target Date

02.07.2016

04.07.2016

21.07.2016 14.07.2016 17.07.2016

29.07.2016

26.08.2016

12.09.2016

Status

Reference to

Completed Completed Sent Completed Completed Completed Completed Sent Completed Completed Sent

2015_22-EEHC-SAG-T-000024

Sent Completed Sent Completed

Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed

29.09.2016

2015_22-EEHC-SAG-L-00073 2015_22-EEHC-SAG-L-00065 2015_22_EEHC_SAG-OC-L-00159 2015_22-EEHC-SAG-L-00060 2015_22-EEHC-SAG-L-00074

Sent Completed Completed

2015_22-EEHC-SAG-L-00076; 2015_22-EEHC-SAG-L-00077

2015_22-EEHC-SAG-L-00078; 2015_22-EEHC-SAG-L-00079 2015_22-EEHC-SAG-L-00077 2015_22-EEHC-SAG-L-00080

2015_22-SAG-EEHC-L-00256; 2015_22-SAG-EEHC-L-00364 2015_22-EEHC-SAG-L-00070; 2015_22-EEHC-SAG-L-00072; 2015_22-SAG-OC_EEHC-L-00179 2015_22-EEHC-SAG-L-00082 2015_22_EEHC_SAG-OC-L-00185

2015_22-EEHC-SAG-L-00081

2015_22_EEHC_SAG-OC-L-00190 2015_22_EEHC_SAG-OC-L-00190 2015_22_EEHC_SAG-OC-L-00190 2015_22_EEHC_SAG-OC-L-00190

2015_22-EEHC-SAG-L-00083 2015_22-OC_EEHC-L-00190

Completed Completed 20.10.2016 21.10.2016

Completed Sent Completed

2015_22-EEHC-SAG-L-00089; 2015_22-SAG-EEHC-L-00364 2015_22-EEHC-SAG-L-00084

Page 5 of 6


Letter-No.(int.) 2015_22-SAG-EEHC-L-00328 2015_22-SAG-EEHC-L-00338 2015_22-SAG-EEHC-L-00335 2015_22-SAG-EEHC-L-00341 2015_22-SAG-EEHC-L-00342 2015_22-SAG-EEHC-L-00344 2015_22-SAG-EEHC-L-00345 2015_22-SAG-EEHC-L-00347 2015_22-SAG-EEHC-L-00349 2015_22-SAG-EEHC-L-00351 2015_22-SAG-EEHC-L-00352 2015_22-SAG-EEHC-L-00353 2015_22-SAG-EEHC-L-00355 2015_22-SAG-EEHC-L-00356 2015_22-SAG-EEHC-L-00357 2015_22-SAG-EEHC-L-00343 2015_22-SAG-EEHC-L-00358

Project: EG1019 MPR No.: 23

Correspondence List (SAG to Customer)

SIEMENS Letter-No.(ext.)

Subject Floods in China Notice of Force Majeure - Change in China Transportation Regulation Surge Arrestor in Generator Circuit Breaker Energization Sequence 500kV GIS Phase 1 Change of Key Personal Siemens Recommended Spare Parts for two years operation acc. to Volume II Section 0.9 Inspection call, PAC pump rev1, Change of Key Personnel_Contact Details of Mr. Huebinger Procedure for back energizing 500 kV GIS Phase 1 Energization Nominee for PAC Pump Inspection, invitation letter Documentation Quantities GIS - Onsite Operation and Maintenance Training Invitation letter and hotel reservation for BAT inspection RE: Commissioning Procedures and Schedule 500kV Cables Connecting Step-Up Transformer to 500kV GIS Inspection call PAC pump update, inspection schedule

Reply Req. No No No No No No No No Yes No No Yes Yes No No No No

Corr. Date 18.10.2016 18.10.2016 19.10.2016 24.10.2016 26.10.2016 27.10.2016 27.10.2016 01.11.2016 01.11.2016 03.11.2016 04.11.2016 07.11.2016 08.11.2016 10.11.2016 14.11.2016 17.11.2016 17.11.2016

2015_22-SAG-EEHC-L-00364 2015_22-SAG-EEHC-L-00366 2015_22-SAG-EEHC-L-00367 2015_22-SAG-EEHC-L-00370 2015_22-SAG-EEHC-L-00372

Spare Parts Offer Inspection call 11MB gasturbine and retest PAC pump, update inspection schedule performance tests of main circulating pumps Inspection call, PAC pump, Inspection call PAC pump Rev1

No Yes No Yes Yes

17.12.2016 23.12.2016 23.12.2016 05.01.2017 10.01.2017

2015_22-SAG-EEHC-L-00374 2015_22-SAG-EEHC-L-00377 2015_22-SAG-EEHC-L-00379 2015_22-SAG-EEHC-L-00380 2015_22-SAG-EEHC-L-00385 2015_22-SAG-EEHC-L-00336 2015_22-SAG-EEHC-L-00391 2015_22-SAG-EEHC-L-00392 2015_22-SAG-EEHC-L-00395 2015_22-SAG-EEHC-L-00396 2015_22-SAG-EEHC-L-00397

3150 A GIS busducts for OHL feeders phase 2 Inspection test main circulating water pumps PAC Inspection call, LP steam turbine 500 kV GIS, MOM 22.1.2017, OPGW, Shutdowns, HV test plan phase 2 3150A GIS busducts for OHL feeders phase 2 NCR-I&C-001 Location of HMI Equipment Invitation letter for LP Steam Turbine 30 Inspection 3150 A GIS busduct for OHL Feeders Phase 2 Inspection call, Steam turbine Unit 30, final 41BAT Buchholz relay operation after flashover inside HV bushing turret Inspection call, Generator circuit breaker

No No Yes No No No No No Yes No Yes

12.01.2017 20.01.2017 24.01.2017 25.01.2017 31.01.2017 01.02.2017 15.02.2017 17.02.2017 22.02.2017 27.02.2017 03.03.2017

10.08.2017

Target Date

02.11.2016

14.11.2016 15.11.2016

30.12.2016 12.01.2017 17.01.2017

31.01.2017

01.03.2017 10.03.2017

Status Completed Completed Completed Completed Completed Completed Completed Completed Sent Completed Completed Completed Sent Completed Completed Completed Completed

Completed Sent Completed Sent Sent Completed Completed Sent Completed Completed Completed Completed Completed Sent Completed Sent

Reference to 2015_22-EEHC_SAG-OC-L-00199 2015_22-EEHC-SAG-L-00088

2015_22_EEHC_SAG-OC-L-00216 2015_22-EEHC-SAG-L-00094 2015_22-EEHC-SAG-L-00075

2015_22_EEHC_SAG-OC-L-00217 2015_22-EEHC-SAG-E-00079 2015_22-EEHC-SAG-L-00089; 2015_22-EEHC-SAG-L-00093; 2015_22-SAG-EEHC-L-00256; 2015_22-SAG-EEHC-L-00299; 2015_22-SAG-EEHC-L-00337

2015_22-SAG-OC_EEHC-L-00068; 2015_22-SAG-OC_EEHC-L-00072

2015_22-EEHC-SAG-L-00104 2015_22-EEHC-SAG-L-00105 2015_22-EEHC-SAG-E-00085

Page 6 of 6


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

A 4. DTL status

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

Product Data Sheet Calibration pot Arrangement drawing Dosing System for Ammonia Circuit and terminal diagram Dosing System for Ammonia Product Data Sheet Warning ligth & horn Product Data Sheet Chemical vapour lock Material Safety Data sheet Dosing Station for Ammonia Operation Instruction Dosing pump Operation Instruction Split Air Conditioner Operation Instruction Dosing pump Operation Instruction Pulsation damper Operation Instruction Overflow Protection Operation Instruction Pressure reducing valve Operation Instruction Capacitive level switch Operation Instruction Process controler Commissioning Clearance Certificate Dosing Station for Ammonia Checklist M01- System Check QCD Checklist M02- Storage Tank 10/20/30QCD10BB001 Checklist M07- Dosing pump XXQCDXXAP001 Dosing System for Ammonia Multi-Shaft Benson type Product Data Sheet Calibration pot Product Data Sheet Ball valve Product Data Sheet Warning ligth & horn Product Data Sheet Chemical vapour lock Operation Instruction Dosing pump Operation Instruction Anchor bolts Operation Instruction Split Air Conditioner Operation Instruction Dosing pump Operation Instruction Pulsation damper Operation Instruction Overflow Protection Operation Instruction Pressure reducing valve Operation Instruction Capacitive level switch

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000986 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988 2015_22-SAG-EEHC-T-000988

2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03

449719891 -

Operation Instruction Process controler

FR

INFO

2015_22-SAG-EEHC-T-000988

2017-07-03

EG1019-10LCA-MBD120-462034 EG1019-10LCA-MQC010-462035 EG1019-10QCL-&MTB010-445105 EG1019-40QCL-&EFS010-445209

446719252 446719269 446390598 448001973

Pump - Quality Documentation Pump Set - EC Declaration Arrangement drawing Dosing System for Oxygen Circuit and terminal diagram Dosing Station for Oxygen

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-000991 2015_22-SAG-EEHC-T-000991 2015_22-SAG-EEHC-T-000992 2015_22-SAG-EEHC-T-000992

2017-07-03 2017-07-03 2017-07-03 2017-07-03

&MDA020

EG1019-QCL-&MDA020-445213

448002024 -

Material Safety Data sheet Dosing Station for Oxygen

FR

INFO

2015_22-SAG-EEHC-T-000992

2017-07-03

&MDC010 &MFB030 &MDC010 &MDC010 &MDC010

EG1019-QCL-&MDC010-445239 EG1019-40QCL10-&MFB030-445103 EG1019-QCL-&MDC010-445267 EG1019-QCL-&MDC010-445270 EG1019-QCL-&MDC010-445239

448002253 500187188 448002543 448002574 448002253

Operation Instruction Compression fitting Dosing System for Oxygen Operation Instruction Mass Flow Controller Operation Instruction Pressure gauge with contact Operation Instruction Compression fitting

FR FR FR FR FR

INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-000992 2015_22-SAG-EEHC-T-000992 2015_22-SAG-EEHC-T-000993 2015_22-SAG-EEHC-T-000993 2015_22-SAG-EEHC-T-000993

2017-07-03 2017-07-03 2017-07-03 2017-07-03 2017-07-03

&MDC010 &MDC010

EG1019-QCL-&MDC010-445265 EG1019-QCL-&MDC010-445266

448002529 448002536 -

Operation Instruction Process controler Operation Instruction Pressure Reducing - Switching Station

FR FR

INFO INFO

2015_22-SAG-EEHC-T-000993 2015_22-SAG-EEHC-T-000993

2017-07-03 2017-07-03

&MDA010 &MTB010 &EFS010 &MDA010 &MDA010 &MDA020 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC100 &MDD030 &MDD030 &MDD030 &MFB030 &MDA010 &MDA010 &MDA010 &MDA010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010 &MDC010

EG1019-QCD-&MDA010-445251 EG1019-10QCD-&MTB010-445104 EG1019-40QCD-&EFS010-445208 EG1019-QCD-&MDA010-445257 EG1019-QCD-&MDA010-445261 EG1019-QCD-&MDA020-445212 EG1019-40QCB-&MDC010-445223 EG1019-QCD-&MDC010-445238 EG1019-QCD-&MDC010-445240 EG1019-QCD-&MDC010-445241 EG1019-QCD-&MDC010-445243 EG1019-QCD-&MDC010-445245 EG1019-QCD-&MDC010-445252 EG1019-QCD-&MDC010-445274 EG1019-QCD-&MDC100-445232 EG1019-QCD-&MDD030-445226 EG1019-QCD-&MDD030-445228 EG1019-QCD-&MDD030-445230 EG1019-40QCD10-&MFB030-445108 EG1019-QCD-&MDA010-445251 EG1019-QCD-&MDA010-445250 EG1019-QCD-&MDA010-445257 EG1019-QCD-&MDA010-445261 EG1019-40QCB-&MDC010-445223 EG1019-QCD-&MDC010-445237 EG1019-QCD-&MDC010-445238 EG1019-QCD-&MDC010-445240 EG1019-QCD-&MDC010-445241 EG1019-QCD-&MDC010-445243 EG1019-QCD-&MDC010-445245 EG1019-QCD-&MDC010-445252

448002383 446390581 448001966 448002444 448002482 448002017 448002215 448002246 448002260 448002284 448002307 448002321 448002390 449719891 448002161 448002109 448002123 448002147 500187713 448002383 448002376 448002444 448002482 448002215 448002239 448002246 448002260 448002284 448002307 448002321 448002390

&MDC010

EG1019-QCD-&MDC010-445274

&MBD120 &MQC010 &MTB010 &EFS010

Originator: [ADM]

B B A A A A A A B A A A A A A A A

C B -

A A A

Page 1 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MQC010 &MBD120 &MDZ070 &MDZ070 &MDZ070 &MDZ070 &MDZ070 &MDZ070 &MDZ070 &MDZ070 &MDC010 &MDC010 &MTB010 &EFS010 &MDA020 &MDC010 &MDC010

EG1019-11LCL-MQC010-462528 EG1019-11LCL-MBD120-462527 EG1019-10MA-&MDZ070-313258 EG1019-10MA-&MDZ070-313263 EG1019-20MA-&MDZ070-313319 EG1019-20MA-&MDZ070-313324 EG1019-30MA-&MDZ070-313376 EG1019-30MA-&MDZ070-313381 EG1019-40MA-&MDZ070-313433 EG1019-40MA-&MDZ070-313438 EG1019-QCL-&MDC010-445267 EG1019-QCL-&MDC010-445270 EG1019-10QCL-&MTB010-445105 EG1019-40QCL-&EFS010-445209 EG1019-QCL-&MDA020-445213 EG1019-QCL-&MDC010-445239 EG1019-QCL-&MDC010-445265

446719504 446719498 507189345 507189390 507237343 507237398 507237930 507237985 507238500 507238555 448002543 448002574 446390598 448001973 448002024 448002253 448002529

C A A A A A A A A B A -

Pump Set - EC Declaration Pump - Quality Documentation General User Information Commissioning Instructions MAA/B/C General User Information Commissioning Instructions MAA/B/C General User Information Commissioning Instructions MAA/B/C General User Information Commissioning Instructions MAA/B/C Operation Instruction Mass Flow Controller Operation Instruction Pressure gauge with contact Arrangement drawing Dosing System for Oxygen Circuit and terminal diagram Dosing Station for Oxygen Material Safety Data sheet Dosing Station for Oxygen Operation Instruction Compression fitting Operation Instruction Process controler

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-000994 2015_22-SAG-EEHC-T-000995 2015_22-SAG-EEHC-T-000996 2015_22-SAG-EEHC-T-000996 2015_22-SAG-EEHC-T-000997 2015_22-SAG-EEHC-T-000997 2015_22-SAG-EEHC-T-000998 2015_22-SAG-EEHC-T-000998 2015_22-SAG-EEHC-T-000999 2015_22-SAG-EEHC-T-000999 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000

2017-07-03 2017-07-03 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-04

&MDC010 &MDC100 &MDD030 &MFB030 &EQC040 &EQC040 &MQC040 &MQC040

EG1019-QCL-&MDC010-445266 EG1019-QCL-&MDC100-445233 EG1019-QCL-&MDD030-445227 EG1019-40QCL10-&MFB030-445103 EG1019-ABK-&EQC040-712042 EG1019-ABK-&EQC040-712043 EG1019-11MK-&MQC040-360276 EG1019-11MK-&MQC040-360277

448002536 448002178 448002116 500187188 499045568 499045575 508246139 508246146

A A A -

Operation Instruction Pressure Reducing - Switching Station Commissioning Clearance Certificate Dosing Station for Oxygen Checklist M01- System Check QCL Dosing System for Oxygen Quality Inspection test for cable Test report Accessories, factory acceptance test Documentation Test Sheet Specification

FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001000 2015_22-SAG-EEHC-T-001001 2015_22-SAG-EEHC-T-001001 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002

2017-07-04 2017-07-04 2017-07-04 2017-07-04 2017-07-05 2017-07-05 2017-07-07 2017-07-07

&MQC040 &MQC040

EG1019-11MK-&MQC040-360278 EG1019-11MK-&MQC040-360279

508246153 508246160 -

Stator frame End shield

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002

2017-07-07 2017-07-07

&MQC040

EG1019-11MK-&MQC040-360297

508246443 -

Bearing shells

FR

INFO

2015_22-SAG-EEHC-T-001002

2017-07-07

&MQC040

EG1019-11MK-&MQC040-360299

508246467 -

Final assembly and final tests

FR

INFO

2015_22-SAG-EEHC-T-001002

2017-07-07

&MQC040

EG1019-11MK-&MQC040-360300

508246474 -

Table of contents

FR

INFO

2015_22-SAG-EEHC-T-001002

2017-07-07

&MQC040

EG1019-11MKA-&MQC040-360280

508246177 -

Cooler

FR

INFO

2015_22-SAG-EEHC-T-001002

2017-07-07

&MQC040 &MQC040 &MQC040

EG1019-11MKA-&MQC040-360281 EG1019-11MKA-&MQC040-360282 EG1019-11MKA-&MQC040-360283

508246184 508246191 508246306 -

Stator lamination End plates Tension bolts

FR FR FR

INFO INFO INFO

2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002

2017-07-07 2017-07-07 2017-07-07

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-11MKA-&MQC040-360284 EG1019-11MKA-&MQC040-360285 EG1019-11MKA-&MQC040-360286 EG1019-11MKA-&MQC040-360287 EG1019-11MKA-&MQC040-360288 EG1019-11MKA-&MQC040-360289 EG1019-11MKA-&MQC040-360290

508246313 508246320 508246337 508246344 508246351 508246368 508246375

Stator core Stator winding bars Circuit ring Stator winding Generator Shaft Coupling Rotor winding copper

FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002

2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07

Originator: [ADM]

-

Page 2 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-11MKA-&MQC040-360291 EG1019-11MKA-&MQC040-360292 EG1019-11MKA-&MQC040-360293 EG1019-11MKA-&MQC040-360294 EG1019-11MKA-&MQC040-360295 EG1019-11MKA-&MQC040-360296 EG1019-11MKA-&MQC040-360298 EG1019-12MK-&MQC040-360326 EG1019-12MK-&MQC040-360327 EG1019-12MK-&MQC040-360328 EG1019-12MK-&MQC040-360329 EG1019-12MK-&MQC040-360347 EG1019-12MK-&MQC040-360349 EG1019-12MK-&MQC040-360350 EG1019-12MK-&MQC040-360351

508246382 508246399 508246405 508246412 508246429 508246436 508246450 508257678 508257685 508257692 508257807 508258095 508258118 508258125 508258132

-

Wedges Retaining rings incl. insert ring Blower hubs Blower blades Inductor complete H2-Shaft Sealing H.V. Bushing Documentation Test Sheet Specification Stator frame End shield Bearing shells Final assembly and final tests Table of contents Change Document

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001002 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003

2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-12MKA-&MQC040-360330 EG1019-12MKA-&MQC040-360331 EG1019-12MKA-&MQC040-360332 EG1019-12MKA-&MQC040-360333 EG1019-12MKA-&MQC040-360334 EG1019-12MKA-&MQC040-360335 EG1019-12MKA-&MQC040-360336 EG1019-12MKA-&MQC040-360337 EG1019-12MKA-&MQC040-360338 EG1019-12MKA-&MQC040-360339

508257814 508257821 508257838 508257845 508257852 508257869 508257876 508257883 508257890 508257906

-

Cooler Stator lamination End plates Tension bolts Stator core Stator winding bars Circuit ring Stator winding Generator Shaft Coupling

FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003

2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07

&MQC040

EG1019-12MKA-&MQC040-360340

508257913 -

Rotor winding copper

FR

INFO

2015_22-SAG-EEHC-T-001003

2017-07-07

&MQC040

EG1019-12MKA-&MQC040-360341

508257951 -

Wedges

FR

INFO

2015_22-SAG-EEHC-T-001003

2017-07-07

&MQC040

EG1019-12MKA-&MQC040-360342

508257982 -

Retaining rings incl. insert ring

FR

INFO

2015_22-SAG-EEHC-T-001003

2017-07-07

&MQC040

EG1019-12MKA-&MQC040-360343

508258026 -

Blower hubs

FR

INFO

2015_22-SAG-EEHC-T-001003

2017-07-07

&MQC040

EG1019-12MKA-&MQC040-360344

508258057 -

Blower blades

FR

INFO

2015_22-SAG-EEHC-T-001003

2017-07-07

&MQC040 &MQC040

EG1019-12MKA-&MQC040-360345 EG1019-12MKA-&MQC040-360346

508258071 508258088 -

Inductor complete H2-Shaft Sealing

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001003

2017-07-07 2017-07-07

&MQC040 &MQC040

EG1019-12MKA-&MQC040-360348 EG1019-21MK-&MQC040-360226

508258101 508241967 -

H.V. Bushing Documentation Test Sheet

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001003 2015_22-SAG-EEHC-T-001004

2017-07-07 2017-07-07

&MQC040

EG1019-21MK-&MQC040-360227

508241974 -

Specification

FR

INFO

2015_22-SAG-EEHC-T-001004

2017-07-07

&MQC040 &MQC040 &MQC040 &MQC040

EG1019-21MK-&MQC040-360228 EG1019-21MK-&MQC040-360229 EG1019-21MK-&MQC040-360247 EG1019-21MK-&MQC040-360249

508241981 508241998 508242674 508242698

Stator frame End shield Bearing shells Final assembly and final tests

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004

2017-07-07 2017-07-07 2017-07-07 2017-07-07

Originator: [ADM]

-

Page 3 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MQC040

EG1019-21MK-&MQC040-360250

508242704 -

Table of contents

FR

INFO

2015_22-SAG-EEHC-T-001004

2017-07-07

&MQC040

EG1019-21MKA-&MQC040-360230

508242506 -

Cooler

FR

INFO

2015_22-SAG-EEHC-T-001004

2017-07-07

&MQC040

EG1019-21MKA-&MQC040-360231

508242513 -

Stator lamination

FR

INFO

2015_22-SAG-EEHC-T-001004

2017-07-07

&MQC040

EG1019-21MKA-&MQC040-360232

508242520 -

End plates

FR

INFO

2015_22-SAG-EEHC-T-001004

2017-07-07

&MQC040

EG1019-21MKA-&MQC040-360233

508242537 -

Tension bolts

FR

INFO

2015_22-SAG-EEHC-T-001004

2017-07-07

&MQC040 &MQC040

EG1019-21MKA-&MQC040-360234 EG1019-21MKA-&MQC040-360235

508242544 508242551 -

Stator core Stator winding bars

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004

2017-07-07 2017-07-07

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-21MKA-&MQC040-360236 EG1019-21MKA-&MQC040-360237 EG1019-21MKA-&MQC040-360238 EG1019-21MKA-&MQC040-360239 EG1019-21MKA-&MQC040-360240 EG1019-21MKA-&MQC040-360241

508242568 508242575 508242582 508242599 508242605 508242612

Circuit ring Stator winding Generator Shaft Coupling Rotor winding copper Wedges

FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004

2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07

&MQC040 &MQC040 &MQC040

EG1019-21MKA-&MQC040-360242 EG1019-21MKA-&MQC040-360243 EG1019-21MKA-&MQC040-360244

508242629 508242636 508242643 -

Retaining rings incl. insert ring Blower hubs Blower blades

FR FR FR

INFO INFO INFO

2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004

2017-07-07 2017-07-07 2017-07-07

&MQC040 &MQC040 &MQC040 &EFA010 &EFE020 &EFE020 &MBD120 &MPD010 &MPD010 &MQC010 &MQC040 &MQC040 &MBD120 &MPD010 &MPD010 &MQC010 &MQC040 &MQC040 &MBD120 &MPD010 &MPD010 &MQC010 &MQC040 &MQC040 &MQC040

EG1019-21MKA-&MQC040-360245 EG1019-21MKA-&MQC040-360246 EG1019-21MKA-&MQC040-360248 EG1019-C-&EFA010-850233 EG1019-C-&EFE020-850228 EG1019-C-&EFE020-850230 EG1019-11CYQ-&MBD120-630757 EG1019-11CYQ-&MPD010-630756 EG1019-11CYQ-&MPD010-630755 EG1019-11CYQ-&MQC010-630753 EG1019-11CYQ-&MQC040-630761 EG1019-11CYQ-&MQC040-630750 EG1019-12CYQ-&MBD120-630757 EG1019-12CYQ-&MPD010-630756 EG1019-12CYQ-&MPD010-630755 EG1019-12CYQ-&MQC010-630753 EG1019-12CYQ-&MQC040-630761 EG1019-12CYQ-&MQC040-630750 EG1019-11MPB10-&MBD120-629757 EG1019-11MPB10-&MPD010-629756 EG1019-11MPB10-&MPD010-629754 EG1019-11MPB10-&MQC010-629752 EG1019-11MPB10-&MQC040-629769 EG1019-11MPB10-&MQC040-629768 EG1019-11MPB10-&MQC040-629766

508242650 508242667 508242681 503269393 498140981 503269713 507954004 507954011 507954028 507954035 507953984 507954059 507954370 507954387 507954394 507954400 507954363 507954424 507952253 507952260 507952277 507952284 507952154 507952161 507952178

Inductor complete H2-Shaft Sealing H.V. Bushing Gas Turbine Trip System Overview - Gas only Description Gas Turbine Control and Protection - Gas only Description Gas Turbine Governor - Gas only Inspection and Test Plans List of Equipment Components according ATEX List of Components EC Declaration of Conformity or Declaration of Incorporation Test Records acc. to Inspection and Test Plan Cover Sheet Inspection and Test Plans List of Equipment Components according ATEX List of Components EC Declaration of Conformity or Declaration of Incorporation Test Records acc. to Inspection and Test Plan Cover Sheet Inspection and Test Plans List of Equipment Components according ATEX List of Components EC Declaration of Conformity or Declaration of Incorporation Coating Protocols + protocols of coating reference areas Protocols of None Destructive Tests (NDT) Test Records acc. to Inspection and Test Plan

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001004 2015_22-SAG-EEHC-T-001005 2015_22-SAG-EEHC-T-001005 2015_22-SAG-EEHC-T-001005 2015_22-SAG-EEHC-T-001006 2015_22-SAG-EEHC-T-001006 2015_22-SAG-EEHC-T-001006 2015_22-SAG-EEHC-T-001006 2015_22-SAG-EEHC-T-001006 2015_22-SAG-EEHC-T-001006 2015_22-SAG-EEHC-T-001007 2015_22-SAG-EEHC-T-001007 2015_22-SAG-EEHC-T-001007 2015_22-SAG-EEHC-T-001007 2015_22-SAG-EEHC-T-001007 2015_22-SAG-EEHC-T-001007 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008

2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-07 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10

Originator: [ADM]

-

A A A -

Page 4 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MQC040 &MQC040 &MQC040 &MQC070 &MQC070 &MQC070 &MQC070 &MBD120 &MPD010 &MPD010 &MQC010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC070 &MQC070 &MQC070

EG1019-11MPB10-&MQC040-629759 EG1019-11MPB10-&MQC040-629750 EG1019-11MPB10-&MQC040-629760 EG1019-11MPB10-&MQC070-629763 EG1019-11MPB10-&MQC070-629762 EG1019-11MPB10-&MQC070-629761 EG1019-11MPB10-&MQC070-629758 EG1019-12MPB10-&MBD120-629757 EG1019-12MPB10-&MPD010-629756 EG1019-12MPB10-&MPD010-629754 EG1019-12MPB10-&MQC010-629752 EG1019-12M1PB10-&MQC040-629769 EG1019-12MPB10-&MQC040-629768 EG1019-12MPB10-&MQC040-629766 EG1019-12MPB10-&MQC040-629759 EG1019-12MPB10-&MQC040-629750 EG1019-12MPB10-&MQC040-629760 EG1019-12MPB10-&MQC070-629763 EG1019-12MPB10-&MQC070-629762 EG1019-12MPB10-&MQC070-629761

507952222 507952291 507952307 507952185 507952192 507952208 507952239 507952840 507952857 507952864 507952871 507952765 507952772 507952789 507952826 507952888 507952895 507952796 507952802 507952819

-

Material Certificates Table of Content Cover Sheet List of Welders Welding Specifications Welding Process Qualification List of Materials with Lot Numbers Inspection and Test Plans List of Equipment Components according ATEX List of Components EC Declaration of Conformity or Declaration of Incorporation Coating Protocols + protocols of coating reference areas Protocols of None Destructive Tests (NDT) Test Records acc. to Inspection and Test Plan Material Certificates Table of Content Cover Sheet List of Welders Welding Specifications Welding Process Qualification

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001008 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001009

2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10

&MQC070 &MBD120 &MPD010 &MQC010

EG1019-12MPB10-&MQC070-629758 EG1019-11SGJ-&MBD120-630256 EG1019-11SGJ-&MPD010-630255 EG1019-11SGJ-&MQC010-630257

507952833 507955575 507955599 507955551

-

List of Materials with Lot Numbers Inspection and Test Plans List of Equipment Components according PED 97/23/CE EC Declaration of Conformity or Declaration of Incorporation

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001009 2015_22-SAG-EEHC-T-001010 2015_22-SAG-EEHC-T-001010 2015_22-SAG-EEHC-T-001010

2017-07-10 2017-07-10 2017-07-10 2017-07-10

&MQC040 &MBD120 &MPD010 &MQC010

EG1019-11SGJ-&MQC040-630250 EG1019-12SGJ-&MBD120-630256 EG1019-12SGJ-&MPD010-630255 EG1019-12SGJ-&MQC010-630257

507955612 507955889 507956008 507955865

-

Cover Sheet Inspection and Test Plans List of Equipment Components according PED 97/23/CE EC Declaration of Conformity or Declaration of Incorporation

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001010 2015_22-SAG-EEHC-T-001011 2015_22-SAG-EEHC-T-001011 2015_22-SAG-EEHC-T-001011

2017-07-10 2017-07-10 2017-07-10 2017-07-10

&MQC040 &MQC010 &MQC010 &MQC010

EG1019-12SGJ-&MQC040-630250 EG1019-11CYE-&MQC010-630765 EG1019-11CYE-&MQC010-630764 EG1019-11CYQ-&MQC010-630763

507956022 507954622 507954639 507954653

-

Cover Sheet Cabinet GF - EC Declaration of Conformity_EG1019_U11 Cabinet GH - EC Declaration of Conformity_EG1019_U11 MSA PrimaXIR_EG1019_U11 - Certificate of Calibration and Conformance

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001011 2015_22-SAG-EEHC-T-001012 2015_22-SAG-EEHC-T-001012 2015_22-SAG-EEHC-T-001012

2017-07-10 2017-07-10 2017-07-10 2017-07-10

&MQC010 &MQC010 &MQC010 &EQC010

EG1019-12CYE-&MQC010-630765 EG1019-12CYE-&MQC010-630764 EG1019-12CYQ-&MQC010-630763 EG1019-11MPB10-&EQC010-629751

507954684 507954691 507954707 507953205

-

Cabinet GF - EC Declaration of Conformity_EG1019_U12 Cabinet GH - EC Declaration of Conformity_EG1019_U12 MSA PrimaXIR_EG1019_U12 - Certificate of Calibration and Conformance Ex-proof light fitting / SCHUCH / EC Declaration of Conformity

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001013 2015_22-SAG-EEHC-T-001013 2015_22-SAG-EEHC-T-001013 2015_22-SAG-EEHC-T-001014

2017-07-10 2017-07-10 2017-07-10 2017-07-10

&EQC010 &EQC010 &EQC010 &EQC010 &MQC010 &MQC010 &MQC010 &MQC010

EG1019-11MPB10-&EQC010-629750 EG1019-11MPB10-&EQC010-629757 EG1019-11MPB10-&EQC010-629756 EG1019-11MPB10-&EQC010-629752 EG1019-11MPB10-&MQC010-629768 EG1019-11MPB10-&MQC010-629767 EG1019-11MPB10-&MQC010-629766 EG1019-11MPB10-&MQC010-629765

507953212 507953144 507953151 507953199 507952932 507952949 507952956 507952963

-

explosion protected light fitting / SCHUCH / EC Declaration of Conformity spring return motor / BELIMO / Declaration of Conformity signal processer / TURCK / Declaration of Conformity fan drive / AC-MOTOREN / EC Declaration of Conformity life line system / ABS_SAFETY / Certificate fall protection anchoring / RUD / EC Declaration of the manufacturer eye bolt / RUD / EC Declaration of Conformity STARPOINT eye bolt / RUD / EC Declaration of Conformity

FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014

2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10

Originator: [ADM]

Page 5 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &EQC010 &EQC010 &EQC010 &EQC010 &EQC010 &EQC010 &EQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010

EG1019-11MPB10-&MQC010-629763 EG1019-11MPB10-&MQC010-629762 EG1019-11MPB10-&MQC010-629761 EG1019-11MPB10-&MQC010-629760 EG1019-11MPB10-&MQC010-629764 EG1019-11MPB10-&MQC010-629759 EG1019-11MPB10-&MQC010-629758 EG1019-11MPB10-&MQC010-629754 EG1019-11MPB10-&MQC010-629753 EG1019-12MPB10-&EQC010-629755 EG1019-12MPB10-&EQC010-629751 EG1019-12MPB10-&EQC010-629750 EG1019-12MPB10-&EQC010-629757 EG1019-12MPB10-&EQC010-629756 EG1019-12MPB10-&EQC010-629752 EG1019-12MPB10-&EQC010-629755 EG1019-12MPB10-&MQC010-629768 EG1019-12MPB10-&MQC010-629767 EG1019-12MPB10-&MQC010-629766 EG1019-12MPB10-&MQC010-629765 EG1019-12MPB10-&MQC010-629763 EG1019-12MPB10-&MQC010-629762 EG1019-12MPB10-&MQC010-629761

507952987 507952994 507953106 507953113 507952970 507953120 507953137 507953175 507953182 508320631 507953410 507953427 507953359 507953366 507953403 508320662 507953243 507953250 507953267 507953274 507953298 507953304 507953311

-

push bar panic exit devices / ISEO / Certificate of Constancy of Performance door closer / GEZE / Declaration of Performance KBK-system / DEMAG / EC Conformity chain hoist / DEMAG / EC Conformity fan / VENTILATORY / Declaration of Conformity air operation damper / SYSTEMAIR / EC Declaration of Conformity multi-blade damper / ROBERT_GEIGER / Attestation of Conformity flow meter FCS / TURCK / Declaration of Conformity pressure switch for gas and air / DUNGS / Conformity Certificate resistance thermometer / WIKA / EC Declaration of Conformity Ex-proof light fitting / SCHUCH / EC Declaration of Conformity explosion protected light fitting / SCHUCH / EC Declaration of Conformity spring return motor / BELIMO / Declaration of Conformity signal processer / TURCK / Declaration of Conformity fan drive / AC-MOTOREN / EC Declaration of Conformity resistance thermometer / WIKA / EC Declaration of Conformity life line system / ABS_SAFETY / Certificate fall protection anchoring / RUD / EC Declaration of the manufacturer eye bolt / RUD / EC Declaration of Conformity STARPOINT eye bolt / RUD / EC Declaration of Conformity push bar panic exit devices / ISEO / Certificate of Constancy of Performance door closer / GEZE / Declaration of Performance KBK-system / DEMAG / EC Conformity

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001014 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015

2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10

&MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010 &MQC010

EG1019-12MPB10-&MQC010-629760 EG1019-12MPB10-&MQC010-629764 EG1019-12MPB10-&MQC010-629759 EG1019-12MPB10-&MQC010-629758 EG1019-12MPB10-&MQC010-629754 EG1019-12MPB10-&MQC010-629753 EG1019-11SGJ-&MQC010-630278 EG1019-11SGJ-&MQC010-630277 EG1019-11SGJ-&MQC010-630276 EG1019-11SGJ-&MQC010-630275 EG1019-11SGJ-&MQC010-630274 EG1019-11SGJ-&MQC010-630273 EG1019-11SGJ-&MQC010-630271 EG1019-11SGJ-&MQC010-630270 EG1019-11SGJ-&MQC010-630269 EG1019-11SGJ-&MQC010-630268 EG1019-11SGJ-&MQC010-630278 EG1019-12SGJ-&MQC010-630278 EG1019-12SGJ-&MQC010-630277

507953328 507953281 507953335 507953342 507953380 507953397 507956206 507956213 507956237 507956244 507956251 507956268 507956299 507956305 507956329 507956336 508328118 507956541 507956565

-

chain hoist / DEMAG / EC Conformity fan / VENTILATORY / Declaration of Conformity air operation damper / SYSTEMAIR / EC Declaration of Conformity multi-blade damper / ROBERT_GEIGER / Attestation of Conformity flow meter FCS / TURCK / Declaration of Conformity pressure switch for gas and air / DUNGS / Conformity Certificate Manifold_SO160722-Z4_EG1019_U11 Pipe EG1019_U21_22_31_32_41_42-Test Certificate Fittings GF - Test Report 2.2 SR_SO160722-Z3_EG10xx_Uall SR_SO160722-Z2_EG10xx_Uall SR_SO160722-Z1_EG10xx_Uall N2 10 ltr._EG1019_U11_Worthington Cylinder control sheet Nitrogen 10 ltr.-200 bar, BO 480._EG1019_U11 CO2 80 ltr._EG1019_U11 Cylinder control sheet Co2_EG1019_U11 Inspection Certificate 3.1_Runge_Container_EG10xx Manifold_SO160722-Z4_EG1019_U12 Pipe EG1019_U21_22_31_32_41_42-Test Certificate

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001015 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001016 2015_22-SAG-EEHC-T-001017 2015_22-SAG-EEHC-T-001017

2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10

&MQC010

EG1019-12SGJ-&MQC010-630276

507956572 -

Fittings GF - Test Report 2.2

FR

INFO

2015_22-SAG-EEHC-T-001017

2017-07-10

&MQC010

EG1019-12SGJ-&MQC010-630275

507956596 -

SR_SO160722-Z3_EG10xx_Uall

FR

INFO

2015_22-SAG-EEHC-T-001017

2017-07-10

Originator: [ADM]

Page 6 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MQC010

EG1019-12SGJ-&MQC010-630274

507956619 -

SR_SO160722-Z2_EG10xx_Uall

FR

INFO

2015_22-SAG-EEHC-T-001017

2017-07-10

&MQC010 &MQC010 &MQC010 &MQC010 &MQC010

EG1019-12SGJ-&MQC010-630273 EG1019-12SGJ-&MQC010-630272 EG1019-12SGJ-&MQC010-630271 EG1019-12SGJ-&MQC010-630270 EG1019-12SGJ-&MQC010-630269

507956626 507956633 507956640 507956657 507956664

SR_SO160722-Z1_EG10xx_Uall Inspection Certificate 3.1_Runge_Container_EG10xx N2 10 ltr._EG1019_U12_Worthington Cylinder control sheet Nitrogen 10 ltr.-200 bar, BO 480._EG1019_U12 CO2 80 ltr._EG1019_U12

FR FR FR FR FR

INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001017 2015_22-SAG-EEHC-T-001017 2015_22-SAG-EEHC-T-001017 2015_22-SAG-EEHC-T-001017 2015_22-SAG-EEHC-T-001017

2017-07-10 2017-07-10 2017-07-10 2017-07-10 2017-07-10

&MQC010

EG1019-12SGJ-&MQC010-630268

507956671 -

Cylinder control sheet Co2_EG1019_U12

FR

INFO

2015_22-SAG-EEHC-T-001017

2017-07-10

&MDB060

EG1019-MA-&MDB060-310573

449110032 -

Support for Cross-Over Pipe - Unit 10

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MDB060

EG1019-MA-&MDB060-310577

449110070 -

Shaft Support - Unit 10

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MDB060

EG1019-MA-&MDB060-310581

449110117 -

LP-Shaft Support - Unit 10

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MDB060

EG1019-MA-&MDB060-310585

449110155 -

Valve Supports - Unit 10

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MDB060

EG1019-MA-&MDB060-310593

449110230 -

Hydraulic Cylinders for Revision - Unit 10

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MDC010 &MDC010 &MDC010

EG1019-MA-&MDC010-310564 EG1019-MA-&MDC010-310566 EG1019-MA-&MDC010-310568

449109944 449109968 449109982 -

Lifting Device (Cross Beam) - Unit 10 Lifting Device (C-Hook) - Unit 10 Assembly Device for Valves (Stop Valve Stage 1) - Unit 10

FR FR FR

INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13

&MDC010 &MDC010 &MPA050 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010

EG1019-MA-&MDC010-310570 EG1019-MA-&MDC010-310589 EG1019-MA-&MPA050-310558 EG1019-MAA-&MPB010-310643 EG1019-MAA-&MPB010-310647 EG1019-MAA-&MPB010-310657 EG1019-MAA-&MPB010-310661 EG1019-MAB-&MPB010-310670 EG1019-MAB-&MPB010-310674 EG1019-MAC-&MPB010-313177 EG1019-MAC-&MPB010-313181 EG1019-MAC-&MPB010-313189 EG1019-MAC-&MPB010-313193 EG1019-MAD-&MPB010-310682 EG1019-MAD-&MPB010-310686 EG1019-MAD-&MPB010-313203

449110001 449110193 449109883 449110841 449110889 449110988 449111022 449111114 449111152 449111268 449111305 449111381 449111428 449111503 449111541 449111732

-

Assembly Device for Valves (Control Valve Stage 2) - Unit 10 Hydraulic Cylinders for Erection - Unit 10 List of Tools and Devices (ordered by Design Group) - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13

&MPB010 &MPB010 &MPB010 &MPB010 &MPB010

EG1019-MAD-&MPB010-313207 EG1019-MAD-&MPB010-313221 EG1019-MAD-&MPB010-313225 EG1019-MAG-&MPB010-310706 EG1019-MAG-&MPB010-310710

449111770 449111916 449111954 449112111 449112159

-

List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10 Spare Parts Lists - Unit 10 List of Spare Parts Illustrations - Unit 10

FR FR FR FR FR

INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13

Originator: [ADM]

-

Page 7 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

Support for Cross-Over Pipe - Unit 20 Shaft Support - Unit 20 LP-Shaft Support - Unit 20 Valve Supports - Unit 20 Hydraulic Cylinders for Revision - Unit 20

FR FR FR FR FR

INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13

449109951 -

Lifting Device (Cross Beam) - Unit 20

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

EG1019-MA-&MDC010-310567

449109975 -

Lifting Device (C-Hook) - Unit 20

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MDC010

EG1019-MA-&MDC010-310569

449109999 -

Assembly Device for Valves (Stop Valve Stage 1) - Unit 20

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MDC010

EG1019-MA-&MDC010-310571

449110018 -

Assembly Device for Valves (Control Valve Stage 2) - Unit 20

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MDC010

EG1019-MA-&MDC010-310590

449110209 -

Hydraulic Cylinders for Erection - Unit 20

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MPA050 &MPB010

EG1019-MA-&MPA050-310559 EG1019-MAA-&MPB010-310644

449109890 449110858 -

List of Tools and Devices (ordered by Design Group) - Unit 20 Spare Parts Lists - Unit 20

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13

&MPB010 &MPB010

EG1019-MAA-&MPB010-310648 EG1019-MAA-&MPB010-310658

449110896 449110995 -

List of Spare Parts Illustrations - Unit 20 Spare Parts Lists - Unit 20

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13

&MPB010

EG1019-MAA-&MPB010-310662

449111039 -

List of Spare Parts Illustrations - Unit 20

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MPB010 &MPB010 &MPB010 &MPB010 &MPB010

EG1019-MAB-&MPB010-310671 EG1019-MAB-&MPB010-310675 EG1019-MAC-&MPB010-313178 EG1019-MAC-&MPB010-313182 EG1019-MAC-&MPB010-313190

449111121 449111169 449111275 449111312 449111398

-

Spare Parts Lists - Unit 20 List of Spare Parts Illustrations - Unit 20 Spare Parts Lists - Unit 20 List of Spare Parts Illustrations - Unit 20 Spare Parts Lists - Unit 20

FR FR FR FR FR

INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13

&MPB010

EG1019-MAC-&MPB010-313194

449111435 -

List of Spare Parts Illustrations - Unit 20

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MPB010

EG1019-MAD-&MPB010-310683

449111510 -

Spare Parts Lists - Unit 20

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MPB010

EG1019-MAD-&MPB010-310687

449111558 -

List of Spare Parts Illustrations - Unit 20

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MPB010

EG1019-MAD-&MPB010-313204

449111749 -

Spare Parts Lists - Unit 20

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MPB010 &MPB010

EG1019-MAD-&MPB010-313208 EG1019-MAD-&MPB010-313222

449111787 449111923 -

List of Spare Parts Illustrations - Unit 20 Spare Parts Lists - Unit 20

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13

&MPB010 &MPB010 &MPB010 &MDB060 &MDB060

EG1019-MAD-&MPB010-313226 EG1019-MAG-&MPB010-310707 EG1019-MAG-&MPB010-310711 EG1019-MA-&MDB060-310575 EG1019-MA-&MDB060-310579

449111961 449112128 449112166 449110056 449110094

List of Spare Parts Illustrations - Unit 20 Spare Parts Lists - Unit 20 List of Spare Parts Illustrations - Unit 20 Support for Cross-Over Pipe - Unit 30 Shaft Support - Unit 30

FR FR FR FR FR

INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13

&MDB060 &MDB060

EG1019-MA-&MDB060-310583 EG1019-MA-&MDB060-310587

449110131 449110179 -

LP-Shaft Support - Unit 30 Valve Supports - Unit 30

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13

&MDB060 &MDB060 &MDB060 &MDB060 &MDB060

EG1019-MA-&MDB060-310574 EG1019-MA-&MDB060-310578 EG1019-MA-&MDB060-310582 EG1019-MA-&MDB060-310586 EG1019-MA-&MDB060-310594

449110049 449110087 449110124 449110162 449110247

&MDC010

EG1019-MA-&MDC010-310565

&MDC010

Originator: [ADM]

-

-

Page 8 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

&MDB060 &MDB060 &MPA050 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &BDB020 &MAB010 &MAC010 &MAC010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010

EG1019-MA-&MDB060-310591 EG1019-MA-&MDB060-310595 EG1019-MA-&MPA050-310560 EG1019-MAA-&MPB010-310645 EG1019-MAA-&MPB010-310649 EG1019-MAA-&MPB010-310659 EG1019-MAA-&MPB010-310663 EG1019-MAB-&MPB010-310672 EG1019-MAB-&MPB010-310676 EG1019-MAC-&MPB010-313179 EG1019-MAC-&MPB010-313183 EG1019-MAC-&MPB010-313191 EG1019-MAC-&MPB010-313195 EG1019-MAD-&MPB010-310684 EG1019-MAD-&MPB010-310688 EG1019-MAD-&MPB010-313205 EG1019-MAD-&MPB010-313209 EG1019-MAD-&MPB010-313223 EG1019-MAD-&MPB010-313227 EG1019-MAG-&MPB010-310708 EG1019-MAG-&MPB010-310712 EG1019-MA-&BDB020-310545 EG1019-MA-&MAB010-310542 EG1019-MA-&MAC010-310543 EG1019-MA-&MAC010-310544 EG1019-MA-&MDA010-310547 EG1019-MA-&MDA010-310548 EG1019-MA-&MDA010-310549 EG1019-MA-&MDA010-310550 EG1019-MA-&MDA010-310551 EG1019-MA-&MDA010-310552 EG1019-MAA-&MDA010-310666 EG1019-MAB-&MDA010-310679 EG1019-MAC-&MDA010-313186 EG1019-MAC-&MDA010-313187 EG1019-MAC-&MDA010-313198 EG1019-MAD-&MDA010-310697 EG1019-MAD-&MDA010-310698 EG1019-MAD-&MDA010-310699 EG1019-MAD-&MDA010-313215 EG1019-MAD-&MDA010-313216 EG1019-MAD-&MDA010-313217 EG1019-MAD-&MDA010-313233 EG1019-MAD-&MDA010-313234 EG1019-MAD-&MDA010-313235 EG1019-MAV-&MDA010-310692 EG1019-MAV-&MDA010-310693

Originator: [ADM]

UNID 449110216 449110254 449109906 449110865 449110902 449111008 449111046 449111138 449111176 449111282 449111329 449111404 449111442 449111527 449111565 449111756 449111794 449111930 449111978 449112135 449112173 449109753 449109722 449109739 449109746 449109777 449109784 449109791 449109807 449109814 449109821 449111077 449111206 449111350 449111367 449111473 449111657 449111664 449111671 449111855 449111862 449111879 449112036 449112043 449112050 449111602 449111619

Rev. -

Document Title Hydraulic Cylinders for Erection - Unit 30 Hydraulic Cylinders for Revision - Unit 30 List of Tools and Devices (ordered by Design Group) - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Spare Parts Lists - Unit 30 List of Spare Parts Illustrations - Unit 30 Identification System for Power Plants List of TP2 Equipment Preface Notes on the Use of the Manual Turbine Rating, Rating Plate Data Turbine: Types, Number of Stages and Flows, Moments of Inertia, Weights Valves: Types and Weights Steam Mass Flows, Steam Pressures, Seal Steam Supply System Oil Requirement of Bearings, Lift Oil Pump Cut-In and Out Speeds Thermal Insulation Measuring Insert Measuring Insert Double-mineral-insulated Thermocouple without a washer disc Triple-thermocouple-wire probe with a bayonet cap Duplex-Thermocouples Measuring-inserts Thermocouple with Bayonet and spring Piezoelectric Accelerometer Proximity System Triple-thermocouple-wire probe with a bayonet cap Piezoelectric Accelerometer Proximity System Triple-thermocouple-wire probe with a bayonet cap Piezoelectric Accelerometer Proximity System Check Valve Flow Control Valve

Page 9 of 33

Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

Letter No 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

Delivery Date 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MDA010 &MDA010 &MDA010 &MDA010

EG1019-MAV-&MDA010-310694 EG1019-MAV-&MDA010-310695 EG1019-MAV-&MDA010-310696 EG1019-MAV-&MDA010-313212

449111626 449111633 449111640 449111824

-

Solenoid Directional Valve Pressure Gauge Grub Screw Check Valve

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13

&MDA010 &MDA010 &MDA010 &MDA010

EG1019-MAV-&MDA010-313213 EG1019-MAV-&MDA010-313214 EG1019-MAV-&MDA010-313230 EG1019-MAV-&MDA010-313231

449111831 449111848 449112005 449112012

-

Flow Control Valve Pressure Gauge Check Valve Flow Control Valve

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13

&MDA010 &MDA020 &MDA020 &MDB060

EG1019-MAV-&MDA010-313232 EG1019-10MAG-&MDA020-313017 EG1019-10MAG-&MDA020-313016 EG1019-MA-&MDB060-310553

449112029 500175345 500214839 449109838

-

Pressure Gauge Condenser Data Sheets Condenser Vacuum Curves Main Components

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13

&MDB060 &MDB060 &MDB060 &MDB060

EG1019-MA-&MDB060-310554 EG1019-MA-&MDB060-310555 EG1019-MA-&MDB060-310556 EG1019-MA-&MDB060-310557

449109845 449109852 449109869 449109876

-

Arrangement Drawing Fixed Points HI Turbine Section / Valve Arrangement Bearings / Design

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13

&MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060

EG1019-MA-&MDB060-310562 EG1019-MA-&MDB060-310563 EG1019-MA-&MDB060-310572 EG1019-MA-&MDB060-310576 EG1019-MA-&MDB060-310580 EG1019-MA-&MDB060-310584 EG1019-MA-&MDB060-310588 EG1019-MA-&MDB060-310596 EG1019-MAA-&MDB060-310638 EG1019-MAA-&MDB060-310639 EG1019-MAA-&MDB060-310640 EG1019-MAA-&MDB060-310641 EG1019-MAA-&MDB060-310655 EG1019-MAB-&MDB060-310668 EG1019-MAC-&MDB060-313172 EG1019-MAC-&MDB060-313173 EG1019-MAC-&MDB060-313174 EG1019-MAD-&MDB060-310680 EG1019-MAD-&MDB060-310691 EG1019-MAD-&MDB060-313199 EG1019-MAD-&MDB060-313200 EG1019-MAD-&MDB060-313201 EG1019-MAD-&MDB060-313218 EG1019-MAD-&MDB060-313219 EG1019-MAG-&MDB060-310701 EG1019-MAG-&MDB060-310702 EG1019-MAG-&MDB060-310715 EG1019-MYA-&MDB060-310700

449109920 449109937 449110025 449110063 449110100 449110148 449110186 449110261 449110797 449110803 449110810 449110827 449110964 449111091 449111213 449111220 449111237 449111480 449111596 449111695 449111701 449111718 449111886 449111893 449112067 449112074 449112203 449111688

-

Standard Tools Special Tools Assembly Device for Compensator Cover Support for Cross-Over Pipe - Unit 40 Shaft Support - Unit 40 LP-Shaft Support - Unit 40 Valve Supports - Unit 40 Hydraulic Cylinders for Revision - Unit 40 Casing Casing Supports, Casing Guides Shaft Seals and Balance Pistons Blading Combined Main Steam Stop and Control Valve Combined Reheat Steam Stop and Control Valve Casing Shaft Seals Blading H Turbine Section / Front Bearing Pedestal Combined Thrust and Journal Bearing L Turbine Section / Front Bearing Pedestal Journal Bearing with bedded arc Manual Turning Gear L Turbine Section / Rear Bearing Pedestal Journal Bearing with bedded arc Box-Type Condenser Box Type Condenser / Tubing Bursting Discs Speed Sensor

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13

Originator: [ADM]

Page 10 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MDC010 &MDC010

EG1019-MA-&MDC010-310592 EG1019-MA-&MDC010-310597

449110223 449110278 -

Hydraulic Cylinders for Erection - Unit 40 Hydraulic Cylinders for Valve Inserts

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13

&MDC010 &MPA050 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MQB030 &MQC010 &MTB010 &MTB010 &MTB010 &MTB030 &MTB030 &MTB030

EG1019-MA-&MDC010-310599 EG1019-MA-&MPA050-310561 EG1019-MAA-&MPB010-310646 EG1019-MAA-&MPB010-310650 EG1019-MAA-&MPB010-310652 EG1019-MAA-&MPB010-310654 EG1019-MAA-&MPB010-310660 EG1019-MAA-&MPB010-310664 EG1019-MAB-&MPB010-310653 EG1019-MAB-&MPB010-310673 EG1019-MAB-&MPB010-310677 EG1019-MAC-&MPB010-313180 EG1019-MAC-&MPB010-313184 EG1019-MAC-&MPB010-313192 EG1019-MAC-&MPB010-313196 EG1019-MAD-&MPB010-310685 EG1019-MAD-&MPB010-310689 EG1019-MAD-&MPB010-313206 EG1019-MAD-&MPB010-313210 EG1019-MAD-&MPB010-313224 EG1019-MAD-&MPB010-313228 EG1019-MAG-&MPB010-310709 EG1019-MAG-&MPB010-310713 EG1019-MA-&MQB030-310546 EG1019-MA-&MQC010-310598 EG1019-MA-&MTB010-310720 EG1019-MAC-&MTB010-313175 EG1019-10MAG-&MTB010-313009 EG1019-MAA-&MTB030-310642 EG1019-MAA-&MTB030-310651 EG1019-MAA-&MTB030-310656

449110292 449109913 449110872 449110919 449110933 449110957 449111015 449111053 449110940 449111145 449111183 449111299 449111336 449111411 449111459 449111534 449111572 449111763 449111800 449111947 449111985 449112142 449112180 449109760 449110285 449112210 449111244 501224615 449110834 449110926 449110971

Bolt Heating Device List of Tools and Devices (ordered by Design Group) - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Double-mineral-insulated thermocouple with a washer disc Measuring Insert Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Double-mineral-insulated Thermocouple without a washer disc Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 Spare Parts Lists - Unit 40 List of Spare Parts Illustrations - Unit 40 General Safety Information Separate Delivered Lifting Accessories Balancing at the Plant Balancing at the Plant Tube Pattern Design Group Overviews Spare Parts Illustrations Design Group Overviews

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13

&MTB030

EG1019-MAA-&MTB030-310665

449111060 -

Spare Parts Illustrations

FR

INFO

2015_22-SAG-EEHC-T-001018

2017-07-13

&MTB030 &MTB030 &MTB030 &MTB030

EG1019-MAB-&MTB030-310669 EG1019-MAB-&MTB030-310678 EG1019-MAC-&MTB030-313176 EG1019-MAC-&MTB030-313185

449111107 449111190 449111251 449111343

-

Design Group Overviews Spare Parts Illustrations Design Group Overviews Spare Parts Illustrations

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13

&MTB030 &MTB030 &MTB030 &MTB030 &MTB030 &MTB030 &MTB030

EG1019-MAC-&MTB030-313188 EG1019-MAC-&MTB030-313197 EG1019-MAD-&MTB030-310681 EG1019-MAD-&MTB030-310690 EG1019-MAD-&MTB030-313202 EG1019-MAD-&MTB030-313211 EG1019-MAD-&MTB030-313220

449111374 449111466 449111497 449111589 449111725 449111817 449111909

-

Design Group Overviews Spare Parts Illustrations Design Group Overviews Spare Parts Illustrations Design Group Overviews Spare Parts Illustrations Design Group Overviews

FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018

2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13

Originator: [ADM]

-

Page 11 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MTB030 &MTB030 &MTB030 &MTC020 &MTC020 &MTC020 &MTC020 &MTC020 &MTC020 &MTC020 &MTC020 &ABB010 &EDA010 &EDA010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDA010 &EDC010 &EDC010 &ETB010 &MDC020

EG1019-MAD-&MTB030-313229 EG1019-MAG-&MTB030-310705 EG1019-MAG-&MTB030-310714 EG1019-MA-&MTC020-310372 EG1019-MA-&MTC020-310398 EG1019-MA-&MTC020-310485 EG1019-MA-&MTC020-310486 EG1019-MA-&MTC020-310487 EG1019-MA-&MTC020-310488 EG1019-MAG-&MTC020-310703 EG1019-MAG-&MTC020-310281 EG1019-11650-&ABB010-000202 EG1019-C-&EDA010-870159 EG1019-C-&EDA010-870160 EG1019-C-&EDC010-870154 EG1019-C-&EDC010-870155 EG1019-C-&EDC010-870156 EG1019-C-&EDC010-870157 EG1019-MAG-&EDC010-870163 EG1019-MAG-&EDC010-870164 EG1019-C-&EDA010-870158 EG1019-C-&EDC010-870153 EG1019-MAN-&EDC010-870162 EG1019-C-&ETB010-870161 EG1019-PUR10-&MDC020-435152

449111992 449112104 449112197 505817912 505818179 505819046 505819053 505819060 505819077 449112081 504249738 508396117 507837772 507837789 507837727 507837734 507837741 507837758 507837819 507837826 507837765 507837710 507837802 507837796 438895438

A A D A D B F -

Spare Parts Illustrations Design Group Overviews Spare Parts Illustrations LONGITUDINAL SECTION ARRANGEMENT OF ENDOSCOPE HOLES VALVE COMPLETE DRY AIR CONNECTION ASSY VALVE COMPLETE DRY AIR CONNECTION ASSY Tube Spacing GENERAL ARRANGEMENT DWG FOR CONDENSER Monthly Progress Report No. 22 WIKA_Surface Themometer TC50_Data Sheet WIKA_Pressure Gauge 233.50_Data Sheet E+H_Pressure Transmitter PMP71_Technical Information E+H_Pressure Transmitter PMP71_Operating Instructions E+H_Pressure Transmitter PMP71_Description of Instrument Functions E+H_Weld-In Adapter and Flanges_Technical Information Heinrichs_Magnetic Level Meter, MBSK, Installation and Operating Instructions Heinrichs_Magnetic Level Meter, MBSK-Ex, Operating manual WIKA_Thermocouple TC10-B_Data Sheet SITRANS P DSIII for Pressure and Differentialpressure 7MF4.33-_Manual Seiko_ISA 1932 Nozzle 6"_O&M Manual Schneider_Manifolds, valves, reducers_Drawings Cathodic Protection O&M

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001018 2015_22-SAG-EEHC-T-001019 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001020 2015_22-SAG-EEHC-T-001021

2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-13 2017-07-14 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18

&MLH020 &EAA010 &EFA010 &EFF010 &MDA010 &MDA010 &MFB030 &MLH020 &MLU010 &MLU010 &MPA070 &MPB010 &MPB010 &MPB010 &EDA010 &EDA010 &EDA010 &EDA010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010

EG1019-10PAC-&MLH020-461010 EG1019-PUR10-&EAA010-435130 EG1019-PUR10-&EFA010-435131 EG1019-PAC-&EFF010-461014 EG1019-PAC-&MDA010-461061 EG1019-PAC-&MDA010-461031 EG1019-40PAC10-&MFB030-461005 EG1019-PAC-&MLH020-461010 EG1019-PUR10-&MLU010-435122 EG1019-PUR10-&MLU010-435123 EG1019-PAC-&MPA070-461017 EG1019-PAC-&MPB010-461011 EG1019-PAC-&MPB010-461012 EG1019-PAC-&MPB010-461019 EG1019-PAC-&EDA010-461201 EG1019-PAC-&EDA010-461404 EG1019-PAC-&EDA010-461405 EG1019-PAC-&EDA010-461409 EG1019-PAC-&EDC010-461200 EG1019-PAC-&EDC010-461406 EG1019-PAC-&EDC010-461407 EG1019-PAC-&EDC010-461408 EG1019-PAC-&EDC010-461410

445107777 447625545 447625446 438894356 448557821 499689540 499690355 438894318 447625385 447625392 438894370 438894325 438894332 438894394 438894721 438895636 438895643 438895681 438894714 438895650 438895667 438895674 438895698

A B A A A C F A A A C B B C A A A C A B B A

Preliminary GA Drawing M2 Cathodic Protection Electrical eng documents Cathodic Protection Single line diagram Logic Diagram Assembly data (torques) Pump - Characteristic Curves (Designed) PuID Piping and Instrumentation Diagram General Arrangement Drawing Cathodic Protection plan view_GA Cathodic Protection side view_GA List of Consumers Lubrications List of Instruments List of Valves List of Recommended Spare Parts Motor - Documentation Temp. Sensor CT001-CT003 Datasheet Temp. Sensor CT071-CT075 Datasheet Temp. Transmitter CT001-CT003 Datasheet Motor - Operating Manual Temp. Sensor CT077-CT079 Datasheet Vib. Sensor CY061-CY062 Datasheet Vib. Sensor CY061-CY062 Manual Temp. Transmitter CT001-CT079 Manual

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001021 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022

2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18

Originator: [ADM]

Page 12 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&EDC010 &EDC010 &EMA020 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDA010 &MDC010 &MDC010 &MDC010 &MDZ050 &MLH020 &MLU010 &MPA050 &MPB010 &MTB010 &MTB010 &MTB010 &MTB010 &MTB010 &MTB010

EG1019-PAC-&EDC010-461411 EG1019-10PAC-&EDC010-461412 EG1019-PAC-&EMA020-461016 EG1019-PAC-&MDA010-461030 EG1019-PAC-&MDA010-461031 EG1019-PAC-&MDA010-461032 EG1019-PAC-&MDA010-461400 EG1019-PAC-&MDA010-461401 EG1019-PAC-&MDA010-461402 EG1019-PAC-&MDC010-461403 EG1019-PAC-&MDC010-461070 EG1019-PAC-&MDC010-461101 EG1019-PAC-&MDC010-461026 EG1019-PAC-&MDZ050-461214 EG1019-PAC-&MLH020-461015 EG1019-PAC-&MLU010-461024 EG1019-PAC-&MPA050-461065 EG1019-PAC-&MPB010-461021 EG1019-PAC-&MTB010-461020 EG1019-PAC-&MTB010-461022 EG1019-PAC-&MTB010-461023 EG1019-PAC-&MTB010-461102 EG1019-PAC-&MTB010-461025 EG1019-PUR10-&MTB010-435114

438895704 438895711 438894363 438894455 438894462 438894479 438895599 438895605 438895612 438895629 438894585 438894684 508080610 438895728 447625828 438894448 438894578 438894417 438894400 438894424 438894431 438894691 508079591 447625330

A A B A C A A A A A A A A A B A A B A A A A

Temp. Transmitter CT071-CT079 Datasheet Manual Transmitter CT071-CT079 Wiring Diagram Pump - Data Sheet Pump - Characteristic Curve Pump - Start Up Curve Thermometer CT501 Datasheet Pressure Gauge CP501 Datasheet Shut Off Valve AA301 Datasheet Sight Glass AX001 Datasheet Pump - Operating Manual Coupling Operating Manual Pump - Axial Bearing Handbook Motor Ladder Extension - Installation Details Cathodic Protection System on Pump Pump - Pipework Plan List of Special Tools Pump - Parts List Pump - Sectional Drawing Pump - Axial Bearing Details Pump - Shaft Seal Details Coupling Dimensional Drawing Pump - Radial Bearing Details Cathodic Protection Disc anode 100 dim dwg

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022

2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18 2017-07-18

&MTB010 &MTB010 &MTB010 &MTB010

EG1019-PUR10-&MTB010-435115 EG1019-PUR10-&MTB010-435117 EG1019-PUR10-&MTB010-435118 EG1019-PUR10-&MTB010-435120

447625347 447625354 447625361 447625378

A A A A

Cathodic Protection Ribbon anode dim dwg Cathodic Protection Reference electrode dim dwg Cathodic Protection Current Collector Cathodic Protection Junction Box Support

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022

2017-07-18 2017-07-18 2017-07-18 2017-07-18

&MTB010 &MTB010 &ELU010 &ELU010

EG1019-PUR10-&MTB010-435124 EG1019-PUR10-&MTB010-435125 EG1019-30CJJ11-&EDC010-870177 EG1019-30CJJ22-&EDC010-870178

447625408 447625415 508054659 508054666

A A A A

Cathodic Protection Disc anode 60 dim dwg Cathodic Protection Reference electrode wall dim dwg 30CJJ11_ARRANGEMENT_DRAWINGS 30CJJ22_ARRANGEMENT_DRAWINGS

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001022 2015_22-SAG-EEHC-T-001024 2015_22-SAG-EEHC-T-001024

2017-07-18 2017-07-18 2017-07-20 2017-07-20

&ELU010 &ELU010 &EMA010 &EMA010

EG1019-30CJJ23-&EDC010-870179 EG1019-30CJJ24-&EDC010-870180 EG1019-30C-&EMA010-870182 EG1019-30C-&EMA010-870183

508054673 508054680 508054703 508054710

A A A A

30CJJ23_ARRANGEMENT_DRAWINGS 30CJJ24_ARRANGEMENT_DRAWINGS ST30_Interconnection Diagrams_Part 1 ST30_Interconnection Diagrams_Part 2

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001024 2015_22-SAG-EEHC-T-001024 2015_22-SAG-EEHC-T-001024 2015_22-SAG-EEHC-T-001024

2017-07-20 2017-07-20 2017-07-20 2017-07-20

&EMA010 &ELU010 &ELU010 &ELU010

EG1019-30CRN-&EMA010-870181 EG1019-40CJJ11-&EDC010-870186 EG1019-40CJJ22-&EDC010-870187 EG1019-40CJJ23-&EDC010-870188

508054697 508070253 508070260 508070277

A A A A

L2 BUS ST30 40CJJ11_ARRANGEMENT_DRAWINGS 40CJJ22_ARRANGEMENT_DRAWINGS 40CJJ23_ARRANGEMENT_DRAWINGS

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001024 2015_22-SAG-EEHC-T-001025 2015_22-SAG-EEHC-T-001025 2015_22-SAG-EEHC-T-001025

2017-07-20 2017-07-20 2017-07-20 2017-07-20

&ELU010 &EMA010 &EMA010 &EMA010

EG1019-40CJJ24-&EDC010-870189 EG1019-40C-&EMA010-870191 EG1019-40C-&EMA010-870192 EG1019-40CRN-&EMA010-870190

508070284 508070307 508070314 508070291

A A A A

40CJJ24_ARRANGEMENT_DRAWINGS ST40_Interconnection Diagrams_Part 1 ST40_Interconnection Diagrams_Part 2 L2 BUS ST40

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001025 2015_22-SAG-EEHC-T-001025 2015_22-SAG-EEHC-T-001025 2015_22-SAG-EEHC-T-001025

2017-07-20 2017-07-20 2017-07-20 2017-07-20

Originator: [ADM]

Page 13 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

&EFS010 &EMA010 &ETB010 &EDD010 &ETB010 &ELU010 &EMA020 &EMA020 &EDD010 &ETB010 &ELU010 &EMA020 &EMA020 &EDD010 &ETB010 &ELU010 &EMA020 &EMA020 &EDD010 &ETB010 &ELU010 &EMA020 &EMA020 &EFS010 &EFS010 &EMA010 &EFS010 &EFS010 &EFS010 &EFS010 &EMA010 &EMA010 &EFS010 &EFS010 &EMA010 &EFS010 &EFS010 &EFS010 &EFS010 &EMA010 &EMA010 &CLH020 &CLH020 &EFS010 &CLB020 &EFS010 &EDB060 &EDC010

EG1019-41BAB40-&EFS010-734543 EG1019-41BAB40-&EMA010-734540 EG1019-BAB40-&ETB010-734541 EG1019-BTA-&EED010-731540 EG1019-BTA-&ETB010-731509 EG1019-BTA-&ELU010-731501 EG1019-31BTA-&EMA020-731502 EG1019-31BTA-&EMA020-731503 EG1019-BTA-&EED010-731540 EG1019-BTA-&ETB010-731509 EG1019-BTA-&ELU010-731501 EG1019-32BTA-&EMA020-731502 EG1019-32BTA-&EMA020-731503 EG1019-BTA-&EED010-731540 EG1019-BTA-&ETB010-731509 EG1019-BTA-&ELU010-731501 EG1019-41BTA-&EMA020-731502 EG1019-41BTA-&EMA020-731503 EG1019-BTA-&EED010-731540 EG1019-BTA-&ETB010-731509 EG1019-BTA-&ELU010-731501 EG1019-42BTA-&EMA020-731502 EG1019-42BTA-&EMA020-731503 EG1019-31MKC-&EFS010-745528 EG1019-31MKC-&EFS010-745532 EG1019-31MKC01-&EMA010-745511 EG1019-32MBJ-&EFS010-745530 EG1019-32MBJ-&EFS010-745531 EG1019-32MKC-&EFS010-745528 EG1019-32MKC-&EFS010-745532 EG1019-32MBJ01-&EMA010-745507 EG1019-32MKC01-&EMA010-745511 EG1019-41MKC-&EFS010-745528 EG1019-41MKC-&EFS010-745532 EG1019-41MKC01-&EMA010-745511 EG1019-42MBJ-&EFS010-745530 EG1019-42MBJ-&EFS010-745531 EG1019-42MKC-&EFS010-745528 EG1019-42MKC-&EFS010-745532 EG1019-42MBJ01-&EMA010-745507 EG1019-42MKC01-&EMA010-745511 EG1019-42UBA-&CLH020-779132 EG1019-31UBA-&CLH020-779101 EG1019-31UBA-&EFS010-779100 EG1019-41UBA-&CLB020-779123 EG1019-UBA-&EFS010-779549 EG1019-UBA-&EDB060-779551 EG1019-UBA-&EDC010-779552

Originator: [ADM]

UNID 447533079 447533062 498063655 502206610 498061941 498061927 446600420 446600437 502206610 498061941 498061927 446600444 446600451 502206610 498061941 498061927 446600468 446600475 502206610 498061941 498061927 446600482 446600499 499164917 500792634 500621781 499164863 500791460 499164924 500792641 500621767 500621774 499164931 500792658 447532997 499164870 500791477 499164948 500792665 447533000 500621750 439831701 439831572 439831565 439831671 503605634 503605610 503605603

Rev. A A A A A A A A A A A A A A A A A A A A A A B B -

Document Title Circuit Diagram SFC C/O Isolator Cubicle 41BAB40 Connection Diagram SFC C/O Isolator Cubicle 41BAB40 Layout Drawing SFC C/O Isolator Cubicle BAB40 Calculation of ventilation Fitting Drawing Battery Rack Layout Drawing Battery on Steel Rack Connection Overview Drawing Battery on Steel Rack 31BTA Connection Details Drawing Battery 31BTA Calculation of ventilation Fitting Drawing Battery Rack Layout Drawing Battery on Steel Rack Connection Overview Drawing Battery on Steel Rack 32BTA Connection Details Drawing Battery 32BTA Calculation of ventilation Fitting Drawing Battery Rack Layout Drawing Battery on Steel Rack Connection Overview Drawing Battery on Steel Rack 41BTA Connection Details Drawing Battery 41BTA Calculation of ventilation Fitting Drawing Battery Rack Layout Drawing Battery on Steel Rack Connection Overview Drawing Battery on Steel Rack 42BTA Connection Details Drawing Battery 42BTA Circuit Diagram SEE Transformer 31MKC PT100 Setting Parameters SEE Transformer 31MKC Connection Diagram SEE Transformer 31MKC01 Circuit Diagram SFC Transformer 32MBJ PT100 Setting Parameters SFC Transformer 32MBJ Circuit Diagram SEE Transformer 32MKC PT100 Setting Parameters SEE Transformer 32MKC Connection Diagram SFC Transformer 32MBJ01 Connection Diagram SEE Transformer 32MKC01 Circuit Diagram SEE Transformer 41MKC PT100 Setting Parameters SEE Transformer 41MKC Connection Diagram SEE Transformer 41MKC01 Circuit Diagram SFC Transformer 42MBJ PT100 Setting Parameters SFC Transformer 42MBJ Circuit Diagram SEE Transformer 42MKC PT100 Setting Parameters SEE Transformer 42MKC Connection Diagram SFC Transformer 42MBJ01 Connection Diagram SEE Transformer 42MKC01 SECTION A-A for GAS TURBINE Drawing Arrangement for Circuit Diagram PCC Station Service 31BJL31 FOUNDATION DRAWING for GAS TURBINE Circuit Diagram Air Conditioning Unit Battery Room Technical Description PCC Operating Instructions PCC

Page 14 of 33

Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

Letter No 2015_22-SAG-EEHC-T-001026 2015_22-SAG-EEHC-T-001026 2015_22-SAG-EEHC-T-001026 2015_22-SAG-EEHC-T-001027 2015_22-SAG-EEHC-T-001027 2015_22-SAG-EEHC-T-001027 2015_22-SAG-EEHC-T-001027 2015_22-SAG-EEHC-T-001027 2015_22-SAG-EEHC-T-001028 2015_22-SAG-EEHC-T-001028 2015_22-SAG-EEHC-T-001028 2015_22-SAG-EEHC-T-001028 2015_22-SAG-EEHC-T-001028 2015_22-SAG-EEHC-T-001029 2015_22-SAG-EEHC-T-001029 2015_22-SAG-EEHC-T-001029 2015_22-SAG-EEHC-T-001029 2015_22-SAG-EEHC-T-001029 2015_22-SAG-EEHC-T-001030 2015_22-SAG-EEHC-T-001030 2015_22-SAG-EEHC-T-001030 2015_22-SAG-EEHC-T-001030 2015_22-SAG-EEHC-T-001030 2015_22-SAG-EEHC-T-001031 2015_22-SAG-EEHC-T-001031 2015_22-SAG-EEHC-T-001031 2015_22-SAG-EEHC-T-001032 2015_22-SAG-EEHC-T-001032 2015_22-SAG-EEHC-T-001032 2015_22-SAG-EEHC-T-001032 2015_22-SAG-EEHC-T-001032 2015_22-SAG-EEHC-T-001032 2015_22-SAG-EEHC-T-001033 2015_22-SAG-EEHC-T-001033 2015_22-SAG-EEHC-T-001033 2015_22-SAG-EEHC-T-001034 2015_22-SAG-EEHC-T-001034 2015_22-SAG-EEHC-T-001034 2015_22-SAG-EEHC-T-001034 2015_22-SAG-EEHC-T-001034 2015_22-SAG-EEHC-T-001034 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001035

Delivery Date 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

&EFS010 &CLH020 &CLB020 &CLH020 &EFS010 &EFS010 &EDB060 &EDC010 &EFS010 &CLH020 &CLB020 &CLH020 &EFS010 &EFS010 &EDB060 &EDC010 &EFS010 &CLH020 &EFS010 &CLB020 &CLH020 &EDB060 &EDC010 &EFS010 &EFS010 &MDA010 &MDA010 &MTB010 &EPA030 &MDA010 &MDA010 &MPB010 &MTB010 &MAB010 &MAB010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-UBA-&EFS010-779557 EG1019-42UBA-&CLH020-779132 EG1019-32UBA-&CLB020-779113 EG1019-32UBA-&CLH020-779111 EG1019-32UBA-&EFS010-779110 EG1019-UBA-&EFS010-779549 EG1019-UBA-&EDB060-779551 EG1019-UBA-&EDC010-779552 EG1019-UBA-&EFS010-779557 EG1019-42UBA-&CLH020-779132 EG1019-41UBA-&CLB020-779123 EG1019-41UBA-&CLH020-779121 EG1019-41UBA-&EFS010-779120 EG1019-UBA-&EFS010-779549 EG1019-UBA-&EDB060-779551 EG1019-UBA-&EDC010-779552 EG1019-UBA-&EFS010-779557 EG1019-42UBA-&CLH020-779132 EG1019-UBA-&EFS010-779549 EG1019-42UBA-&CLB020-779133 EG1019-42UBA-&CLH020-779131 EG1019-UBA-&EDB060-779551 EG1019-UBA-&EDC010-779552 EG1019-42UBA-&EFS010-779130 EG1019-UBA-&EFS010-779557 EG1019-00STG-&MDA010-496365 EG1019-00STG-&MDA010-496366 EG1019-00STG-&MTB010-496372 EG1019-00STG-&EPA030-496312 EG1019-00STG-&MDA010-496365 EG1019-00STG-&MDA010-496366 EG1019-00STG-&MPB010-496304 EG1019-00STG-&MTB010-496372 EG1019-40MA-&MAB010-311017 EG1019-40MA-&MAB010-311020 EG1019-40MA-&MQC040-311018 EG1019-40MA-&MQC040-311019 EG1019-40MA-&MQC040-311021 EG1019-40MA-&MQC040-311022 EG1019-40MA-&MQC040-311023 EG1019-40MA-&MQC040-311024 EG1019-40MA-&MQC040-311025 EG1019-40MA-&MQC040-311026 EG1019-40MA-&MQC040-311027 EG1019-40MA-&MQC040-311028 EG1019-40MA-&MQC040-311029 EG1019-40MA-&MQC040-311030

Originator: [ADM]

UNID 503605627 439831701 439831633 439831619 439831602 503605634 503605610 503605603 503605627 439831701 439831671 439831657 439831640 503605634 503605610 503605603 503605627 439831701 503605634 439831718 439831695 503605610 503605603 439831688 503605627 448307334 448307341 448307181 448307266 448307334 448307341 448307655 448307181 508155615 508155646 508155622 508155639 508155653 508155660 508155677 508155684 508155691 508155707 508155714 508155721 508155738 508155745

Rev. B B C B F B -

Document Title Circuit Diagram Air Conditioning Units PCCs SECTION A-A for GAS TURBINE FOUNDATION DRAWING for GAS TURBINE Drawing Arrangement for Circuit Diagram PCC Station Service 32BJL31 Circuit Diagram Air Conditioning Unit Battery Room Technical Description PCC Operating Instructions PCC Circuit Diagram Air Conditioning Units PCCs SECTION A-A for GAS TURBINE FOUNDATION DRAWING for GAS TURBINE Drawing Arrangement for Circuit Diagram PCC Station Service 41BJL31 Circuit Diagram Air Conditioning Unit Battery Room Technical Description PCC Operating Instructions PCC Circuit Diagram Air Conditioning Units PCCs SECTION A-A for GAS TURBINE Circuit Diagram Air Conditioning Unit Battery Room FOUNDATION DRAWING for GAS TURBINE Drawing Arrangement for Technical Description PCC Operating Instructions PCC Circuit Diagram PCC Station Service 42BJL31 Circuit Diagram Air Conditioning Units PCCs Safety Data Sheets Laboratory Chemicals Safety Data Sheets Reagents for water analysis Arrangement Drawings Circuit Electrical Consumer List Safety Data Sheets Laboratory Chemicals Safety Data Sheets Reagents for water analysis Dispatch List Arrangement Drawings Circuit Table of Contents HI Turbine - Table of Contents Documentation Test Sheet QST- Specification Outer casing Outer casing Inner casing Inner casing Turbine shaft Turbine rotor Stationary blades T-F-3DS Stationary blades T-F-3DS Stationary blades T-F-3DS Stationary blades T-F-3DS

Page 15 of 33

Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

Letter No 2015_22-SAG-EEHC-T-001035 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001036 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001037 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001038 2015_22-SAG-EEHC-T-001039 2015_22-SAG-EEHC-T-001039 2015_22-SAG-EEHC-T-001039 2015_22-SAG-EEHC-T-001040 2015_22-SAG-EEHC-T-001040 2015_22-SAG-EEHC-T-001040 2015_22-SAG-EEHC-T-001040 2015_22-SAG-EEHC-T-001040 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041

Delivery Date 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21 2017-07-21

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MQC040 &MQC040 &MQC040 &MQC040

EG1019-40MA-&MQC040-311031 EG1019-40MA-&MQC040-311032 EG1019-40MA-&MQC040-311033 EG1019-40MA-&MQC040-311034

508155752 508155769 508155776 508155783

-

Stationary blades T-F-3DS Stationary blades T-F-3DS Rotor blades T-F-3DS Rotor blades T-F-3DS

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041

2017-07-21 2017-07-21 2017-07-21 2017-07-21

&MQC040 &MQC040 &MQC040 &MQC040

EG1019-40MA-&MQC040-311035 EG1019-40MA-&MQC040-311036 EG1019-40MA-&MQC040-311037 EG1019-40MA-&MQC040-311038

508155790 508155806 508155813 508155820

-

Rotor blades T-F-3DS Rotor blades T-F-3DS Rotor blades T-F-3DS Valve casing

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041

2017-07-21 2017-07-21 2017-07-21 2017-07-21

&MQC040 &MQC040 &MQC040 &EFS010

EG1019-40MA-&MQC040-311039 EG1019-40MA-&MQC040-311040 EG1019-40MA-&MQC040-311041 EG1019-32BBJ-&EFS010-734562

508155837 508155844 508155851 447534052

A

Valve cover Valve cover Turbine assembly SFC Circuit Breaker Circuit Diagram 32BBJ

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001041 2015_22-SAG-EEHC-T-001043

2017-07-21 2017-07-21 2017-07-21 2017-07-21

&EMA010 &EFS010 &EMA010 &MAB010

EG1019-32BBJ-&EMA010-734517 EG1019-42BBJ-&EFS010-734562 EG1019-42BBJ-&EMA010-734517 EG1019-MBP-&MAB010-352300

500619092 447534069 447532928 502750687

A A A A

Connection Diagram SFC CB SWITCHGEAR 32BBJ SFC Circuit Breaker Circuit Diagram 42BBJ Connection Diagram SFC CB SWITCHGEAR 42BBJ Table of Contents - Control Valve, Fuel Gas, Pilot

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001043 2015_22-SAG-EEHC-T-001044 2015_22-SAG-EEHC-T-001044 2015_22-SAG-EEHC-T-001045

2017-07-21 2017-07-21 2017-07-21 2017-07-24

&MAB010 &MAB010 &MAB010 &MAB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MQB030 &MQB030 &MQB030 &MQB030 &MQB030 &MTB030 &MTB030 &MTB030 &MTB030 &MTB030 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060

EG1019-MBP-&MAB010-352307 EG1019-MBP-&MAB010-352314 EG1019-MBP-&MAB010-352320 EG1019-MBP-&MAB010-352327 EG1019-MBP-&MPB010-352302 EG1019-MBP-&MPB010-352309 EG1019-MBP-&MPB010-352316 EG1019-MBP-&MPB010-352322 EG1019-MBP-&MPB010-352329 EG1019-MBP-&MQB030-352301 EG1019-MBP-&MQB030-352308 EG1019-MBP-&MQB030-352315 EG1019-MBP-&MQB030-352321 EG1019-MBP-&MQB030-352328 EG1019-MBP-&MTB030-352303 EG1019-MBP-&MTB030-352310 EG1019-MBP-&MTB030-352317 EG1019-MBP-&MTB030-352323 EG1019-MBP-&MTB030-352330 EG1019-MBP-&MDB060-352305 EG1019-MBP-&MDB060-352306 EG1019-MBP-&MDB060-352312 EG1019-MBP-&MDB060-352313 EG1019-MBP-&MDB060-352319 EG1019-MBP-&MDB060-352320 EG1019-MBP-&MDB060-352325 EG1019-MBP-&MDB060-352326 EG1019-MBP-&MDB060-352332

503528759 503528957 503529022 503537669 502750731 503528773 503528971 503529046 503537683 498154025 503528766 503528964 503529039 503537676 498154049 503528780 503528988 503529053 503537690 502750786 503527196 503528902 503528919 503529008 503529015 503529084 503529091 503538116

A A A A A A A A A A A A A A A A A A A A A A A A A A A A

Table of Contents - Control Valve, Fuel Gas, Stage A Table of Contents - Control Valve, Fuel Gas, Stage B Table of Contents - Control Valve, Fuel Gas, Stage C Table of Contents - Control Valve, Fuel Gas, Stage D Spare Parts List Spare Parts List Spare Parts List Spare Parts List Spare Parts List Safety Notes Safety Notes Safety Notes Safety Notes Safety Notes Spare Parts Drawing Spare Parts Drawing Spare Parts Drawing Spare Parts Drawing Spare Parts Drawing Control Valve Actuator with trip function Natural Gas Control Valve Actuator Natural Gas Control Valve Actuator Natural Gas Control Valve Actuator Control Valve Natural Gas

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001045 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046

2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24

Originator: [ADM]

Page 16 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MDB060 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010

EG1019-MBP-&MDB060-352333 EG1019-MBP-&MPB010-352304 EG1019-MBP-&MPB010-352311 EG1019-MBP-&MPB010-352318 EG1019-MBP-&MPB010-352324 EG1019-MBP-&MPB010-352331

503538123 498154056 503528797 503528995 503529077 503538109

A A A A A A

Actuator KKS Reference List KKS Reference List KKS Reference List KKS Reference List KKS Reference List

FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046 2015_22-SAG-EEHC-T-001046

2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-21MBP-&MQC040-352434 EG1019-21MBP-&MQC040-352435 EG1019-21MBP-&MQC040-352436 EG1019-21MBP-&MQC040-352437 EG1019-21MBP-&MQC040-352438 EG1019-21MBP-&MQC040-352439 EG1019-21MBP-&MQC040-352440 EG1019-21MBP-&MQC040-352441 EG1019-21MBP-&MQC040-352442 EG1019-21MBP-&MQC040-352443 EG1019-21MBP-&MQC040-352444 EG1019-21MBP-&MQC040-352445 EG1019-21MBP-&MQC040-352446 EG1019-21MBP-&MQC040-352447 EG1019-21MBP-&MQC040-352448 EG1019-21MBP-&MQC040-352449 EG1019-21MBP-&MQC040-352450 EG1019-21MBP-&MQC040-352451 EG1019-21MBP-&MQC040-352452

508323380 508323397 508326008 508326015 508326022 508326039 508326046 508326053 508326060 508326077 508326084 508326091 508326107 508326114 508326121 508326138 508326145 508326152 508326169

-

Quality Test Sheet - Control Valve, Fuel Gas, Pilot Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage A Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage B Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage C Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage D Declaration of Conformity Test Record

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001047

2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24

&MQC040 &MQC040

EG1019-21MBP-&MQC040-352453 EG1019-22MBP-&MQC040-352414

508326176 508320303 -

Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Pilot

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001047 2015_22-SAG-EEHC-T-001048

2017-07-24 2017-07-24

&MQC040 &MQC040

EG1019-22MBP-&MQC040-352415 EG1019-22MBP-&MQC040-352416

508320310 508320327 -

Declaration of Conformity Test Record

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048

2017-07-24 2017-07-24

&MQC040

EG1019-22MBP-&MQC040-352417

508320334 -

Characteristic Curve

FR

INFO

2015_22-SAG-EEHC-T-001048

2017-07-24

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-22MBP-&MQC040-352418 EG1019-22MBP-&MQC040-352419 EG1019-22MBP-&MQC040-352420 EG1019-22MBP-&MQC040-352421 EG1019-22MBP-&MQC040-352422 EG1019-22MBP-&MQC040-352423 EG1019-22MBP-&MQC040-352424 EG1019-22MBP-&MQC040-352425 EG1019-22MBP-&MQC040-352426 EG1019-22MBP-&MQC040-352427 EG1019-22MBP-&MQC040-352428 EG1019-22MBP-&MQC040-352429 EG1019-22MBP-&MQC040-352430

508320341 508320358 508320365 508320372 508320389 508320396 508320402 508320419 508320426 508320433 508320440 508320457 508320464

Quality Test Sheet - Control Valve, Fuel Gas, Stage A Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage B Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage C Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage D

FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048

2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24

Originator: [ADM]

-

Page 17 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-22MBP-&MQC040-352431 EG1019-22MBP-&MQC040-352432 EG1019-22MBP-&MQC040-352433 EG1019-12MBP-&MQC040-352454 EG1019-12MBP-&MQC040-352455 EG1019-12MBP-&MQC040-352456 EG1019-12MBP-&MQC040-352457 EG1019-12MBP-&MQC040-352458 EG1019-12MBP-&MQC040-352459 EG1019-12MBP-&MQC040-352460 EG1019-12MBP-&MQC040-352461 EG1019-12MBP-&MQC040-352462 EG1019-12MBP-&MQC040-352463 EG1019-12MBP-&MQC040-352464 EG1019-12MBP-&MQC040-352465 EG1019-12MBP-&MQC040-352466 EG1019-12MBP-&MQC040-352467 EG1019-12MBP-&MQC040-352468 EG1019-12MBP-&MQC040-352469 EG1019-12MBP-&MQC040-352470 EG1019-12MBP-&MQC040-352471 EG1019-12MBP-&MQC040-352472 EG1019-12MBP-&MQC040-352473 EG1019-11MBP-&MQC040-352474 EG1019-11MBP-&MQC040-352475 EG1019-11MBP-&MQC040-352476 EG1019-11MBP-&MQC040-352477 EG1019-11MBP-&MQC040-352478 EG1019-11MBP-&MQC040-352479 EG1019-11MBP-&MQC040-352480 EG1019-11MBP-&MQC040-352481 EG1019-11MBP-&MQC040-352482 EG1019-11MBP-&MQC040-352483 EG1019-11MBP-&MQC040-352484 EG1019-11MBP-&MQC040-352485 EG1019-11MBP-&MQC040-352486 EG1019-11MBP-&MQC040-352487 EG1019-11MBP-&MQC040-352488 EG1019-11MBP-&MQC040-352489 EG1019-11MBP-&MQC040-352490 EG1019-11MBP-&MQC040-352491 EG1019-11MBP-&MQC040-352492 EG1019-11MBP-&MQC040-352493 EG1019-42MB-&MQC040-351829 EG1019-42MB-&MQC040-351832 EG1019-42MB-&MQC040-351833

508320471 508320488 508320495 508327135 508327142 508327159 508327166 508327173 508327180 508327197 508327401 508327418 508327425 508327432 508327449 508327456 508327463 508327470 508327487 508327494 508327500 508327517 508327524 508327586 508327593 508327807 508327814 508327821 508327838 508327845 508327852 508327869 508327876 508327883 508327890 508327906 508327913 508327920 508327937 508327944 508327951 508327968 508327975 503428769 503550767 503550774

&MQC040

EG1019-42MB-&MQC040-351834

503550781 -

Originator: [ADM]

-

Document Title

Status

Purp

Letter No

Delivery Date

Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Pilot Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage A Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage B Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage C Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage D Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Pilot Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage A Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage B Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage C Declaration of Conformity Test Record Characteristic Curve Quality Test Sheet - Control Valve, Fuel Gas, Stage D Declaration of Conformity Test Record Characteristic Curve Factory Assembly 800861 Cover Table of contents

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001048 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001049 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001050 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051

2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-24 2017-07-25 2017-07-25 2017-07-25

Witness program

FR

INFO

2015_22-SAG-EEHC-T-001051

2017-07-25

Page 18 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MQC040 &MQC040 &MQC040

EG1019-42MB-&MQC040-351835 EG1019-42MB-&MQC040-351836 EG1019-42MB-&MQC040-351837

503550798 503551009 503551016 -

Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6

FR FR FR

INFO INFO INFO

2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051

2017-07-25 2017-07-25 2017-07-25

&MQC040 &MQC040

EG1019-42MB-&MQC040-351838 EG1019-42MB-&MQC040-351839

503551023 503551030 -

Compressor blades stages 7 - 13 Torque discs part 1 - 3

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051

2017-07-25 2017-07-25

&MQC040 &MQC040

EG1019-42MB-&MQC040-351840 EG1019-42MB-&MQC040-351841

503551047 503551054 -

Turbine discs stages 1 - 2 Turbine discs stages 3 - 4

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051

2017-07-25 2017-07-25

&MQC040

EG1019-42MB-&MQC040-351842

503551061 -

Spacer discs part 1 - 4

FR

INFO

2015_22-SAG-EEHC-T-001051

2017-07-25

&MQC040

EG1019-42MB-&MQC040-351843

503551078 -

Turbine blades Stage 1

FR

INFO

2015_22-SAG-EEHC-T-001051

2017-07-25

&MQC040

EG1019-42MB-&MQC040-351844

503551085 -

Turbine blades Stage 2

FR

INFO

2015_22-SAG-EEHC-T-001051

2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-42MB-&MQC040-351845 EG1019-42MB-&MQC040-351846 EG1019-42MB-&MQC040-351847 EG1019-42MB-&MQC040-351848 EG1019-42MB-&MQC040-351849 EG1019-42MB-&MQC040-351850 EG1019-42MB-&MQC040-351851 EG1019-42MB-&MQC040-351852 EG1019-42MB-&MQC040-351853 EG1019-42MB-&MQC040-351854 EG1019-42MB-&MQC040-351855 EG1019-42MB-&MQC040-351856 EG1019-42MB-&MQC040-351857 EG1019-42MB-&MQC040-351858 EG1019-42MB-&MQC040-351859 EG1019-42MB-&MQC040-351860 EG1019-42MB-&MQC040-351861 EG1019-42MB-&MQC040-351862 EG1019-42MB-&MQC040-351863 EG1019-42MB-&MQC040-351864 EG1019-42MB-&MQC040-351865 EG1019-42MB-&MQC040-351866 EG1019-42MB-&MQC040-351867 EG1019-42MB-&MQC040-351868 EG1019-42MB-&MQC040-351869 EG1019-42MB-&MQC040-351870 EG1019-42MB-&MQC040-351910 EG1019-11MB-&MQC040-352035 EG1019-11MB-&MQC040-352036 EG1019-11MB-&MQC040-352037 EG1019-11MB-&MQC040-352038

503551092 503551108 503551115 503551122 503551139 503551146 503551153 503551160 503551177 503551184 503551191 503551207 503551214 503551221 503551238 503551245 503551252 503551269 503551276 503551283 503551290 503551306 503551313 503551320 503551337 503551344 508314753 508318829 508318836 508318843 508318850

Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut Rotor assembly Compressor Inlet casing Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3 Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Outer Diffuser Inner Diffuser Turbine exhaust casing Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing Gas turbine complete Manufacturer’s Declaration Manufacturer’s Declaration Cover Table of contents Witness program

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001051 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

Originator: [ADM]

-

Page 19 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13 Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4 Spacer discs part 1 - 4 Turbine blades Stage 1 Turbine blades Stage 2 Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut Rotor assembly Bearing Housing, Compressor Bearing Body, Compressor Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3 Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Outer Diffuser Inner Diffuser Bearing Housing, Turbine Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052 2015_22-SAG-EEHC-T-001052

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

508319338 -

Gas turbine complete

FR

INFO

2015_22-SAG-EEHC-T-001052

2017-07-25

EG1019-11MB-&MQC040-352079

508319505 -

Factory Assembly MB000132

FR

INFO

2015_22-SAG-EEHC-T-001052

2017-07-25

&MQC040

EG1019-12MB-&MQC040-351994

508316986 -

Manufacturer’s Declaration

FR

INFO

2015_22-SAG-EEHC-T-001053

2017-07-25

&MQC040

EG1019-12MB-&MQC040-351995

508316993 -

Cover

FR

INFO

2015_22-SAG-EEHC-T-001053

2017-07-25

&MQC040

EG1019-12MB-&MQC040-351996

508317006 -

Table of contents

FR

INFO

2015_22-SAG-EEHC-T-001053

2017-07-25

&MQC040

EG1019-12MB-&MQC040-351997

508317013 -

Witness program

FR

INFO

2015_22-SAG-EEHC-T-001053

2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-11MB-&MQC040-352039 EG1019-11MB-&MQC040-352040 EG1019-11MB-&MQC040-352041 EG1019-11MB-&MQC040-352042 EG1019-11MB-&MQC040-352043 EG1019-11MB-&MQC040-352044 EG1019-11MB-&MQC040-352045 EG1019-11MB-&MQC040-352046 EG1019-11MB-&MQC040-352047 EG1019-11MB-&MQC040-352048 EG1019-11MB-&MQC040-352049 EG1019-11MB-&MQC040-352050 EG1019-11MB-&MQC040-352051 EG1019-11MB-&MQC040-352052 EG1019-11MB-&MQC040-352053 EG1019-11MB-&MQC040-352054 EG1019-11MB-&MQC040-352055 EG1019-11MB-&MQC040-352056 EG1019-11MB-&MQC040-352057 EG1019-11MB-&MQC040-352058 EG1019-11MB-&MQC040-352059 EG1019-11MB-&MQC040-352060 EG1019-11MB-&MQC040-352061 EG1019-11MB-&MQC040-352062 EG1019-11MB-&MQC040-352063 EG1019-11MB-&MQC040-352064 EG1019-11MB-&MQC040-352065 EG1019-11MB-&MQC040-352066 EG1019-11MB-&MQC040-352067 EG1019-11MB-&MQC040-352068 EG1019-11MB-&MQC040-352069 EG1019-11MB-&MQC040-352070 EG1019-11MB-&MQC040-352071 EG1019-11MB-&MQC040-352072 EG1019-11MB-&MQC040-352073 EG1019-11MB-&MQC040-352074

508318867 508318874 508318881 508318898 508318904 508318911 508318928 508318935 508318942 508318959 508318966 508318973 508318980 508318997 508319109 508319116 508319123 508319130 508319154 508319161 508319178 508319185 508319192 508319208 508319215 508319222 508319239 508319246 508319253 508319260 508319277 508319284 508319291 508319307 508319314 508319321

&MQC040

EG1019-11MB-&MQC040-352075

&MQC040

Originator: [ADM]

-

Page 20 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13 Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4 Spacer discs part 1 - 4 Turbine blades Stage 1 Turbine blades Stage 2

FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

508317129 -

Turbine blades stage 3

FR

INFO

2015_22-SAG-EEHC-T-001053

2017-07-25

EG1019-12MB-&MQC040-352009

508317136 -

Turbine blades stage 4

FR

INFO

2015_22-SAG-EEHC-T-001053

2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-12MB-&MQC040-352010 EG1019-12MB-&MQC040-352011 EG1019-12MB-&MQC040-352012 EG1019-12MB-&MQC040-352013 EG1019-12MB-&MQC040-352014 EG1019-12MB-&MQC040-352015 EG1019-12MB-&MQC040-352016 EG1019-12MB-&MQC040-352017 EG1019-12MB-&MQC040-352018 EG1019-12MB-&MQC040-352019 EG1019-12MB-&MQC040-352020 EG1019-12MB-&MQC040-352021 EG1019-12MB-&MQC040-352022 EG1019-12MB-&MQC040-352023 EG1019-12MB-&MQC040-352024 EG1019-12MB-&MQC040-352025 EG1019-12MB-&MQC040-352026 EG1019-12MB-&MQC040-352027 EG1019-12MB-&MQC040-352028 EG1019-12MB-&MQC040-352029 EG1019-12MB-&MQC040-352030

508317143 508317150 508317167 508317174 508317181 508317198 508317204 508317211 508317228 508317235 508317242 508317259 508317266 508317273 508317280 508317297 508317303 508317310 508317327 508317334 508317341

Rear hollow shaft Tie rod Tie rod nut Rotor assembly Bearing Housing, Compressor Bearing Body, Compressor Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3 Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Outer Diffuser Inner Diffuser Bearing Housing, Turbine Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MQC040 &MQC040

EG1019-12MB-&MQC040-352031 EG1019-12MB-&MQC040-352032

508317358 508317365 -

Turbine vanes stages 4 Cylinder Outer Casing

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053

2017-07-25 2017-07-25

&MQC040

EG1019-12MB-&MQC040-352033

508317372 -

Cone Outer Casing

FR

INFO

2015_22-SAG-EEHC-T-001053

2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040

EG1019-12MB-&MQC040-352034 EG1019-12MB-&MQC040-352078 EG1019-21MB-&MQC040-351954 EG1019-21MB-&MQC040-351955

508317389 508319499 508316153 508316160

Gas turbine complete Factory Assembly MB000129 Manufacturer’s Declaration Cover

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001053 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054

2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MQC040

EG1019-21MB-&MQC040-351956

508316177 -

Table of contents

FR

INFO

2015_22-SAG-EEHC-T-001054

2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-12MB-&MQC040-351998 EG1019-12MB-&MQC040-351999 EG1019-12MB-&MQC040-352000 EG1019-12MB-&MQC040-352001 EG1019-12MB-&MQC040-352002 EG1019-12MB-&MQC040-352003 EG1019-12MB-&MQC040-352004 EG1019-12MB-&MQC040-352005 EG1019-12MB-&MQC040-352006 EG1019-12MB-&MQC040-352007

508317020 508317037 508317044 508317051 508317068 508317075 508317082 508317099 508317105 508317112

&MQC040

EG1019-12MB-&MQC040-352008

&MQC040

Originator: [ADM]

-

-

-

Page 21 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

Witness program Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13

FR FR FR FR FR

INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

508316337 508316344 508316351 -

Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4

FR FR FR

INFO INFO INFO

2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054

2017-07-25 2017-07-25 2017-07-25

EG1019-21MB-&MQC040-351965 EG1019-21MB-&MQC040-351966 EG1019-21MB-&MQC040-351967 EG1019-21MB-&MQC040-351968 EG1019-21MB-&MQC040-351969 EG1019-21MB-&MQC040-351970 EG1019-21MB-&MQC040-351971 EG1019-21MB-&MQC040-351972 EG1019-21MB-&MQC040-351973 EG1019-21MB-&MQC040-351974 EG1019-21MB-&MQC040-351975 EG1019-21MB-&MQC040-351976 EG1019-21MB-&MQC040-351977 EG1019-21MB-&MQC040-351978 EG1019-21MB-&MQC040-351979 EG1019-21MB-&MQC040-351980 EG1019-21MB-&MQC040-351981 EG1019-21MB-&MQC040-351982 EG1019-21MB-&MQC040-351983 EG1019-21MB-&MQC040-351984 EG1019-21MB-&MQC040-351985 EG1019-21MB-&MQC040-351986 EG1019-21MB-&MQC040-351987 EG1019-21MB-&MQC040-351988 EG1019-21MB-&MQC040-351989 EG1019-21MB-&MQC040-351990 EG1019-21MB-&MQC040-351991 EG1019-21MB-&MQC040-351992 EG1019-21MB-&MQC040-351993 EG1019-21MB-&MQC040-352077

508316368 508316375 508316382 508316399 508316405 508316412 508316429 508316436 508316443 508316450 508316467 508316474 508316481 508316498 508316504 508316511 508316528 508316535 508316542 508316559 508316566 508316573 508316580 508316597 508316702 508316719 508316726 508316733 508316740 508319482

Spacer discs part 1 - 4 Turbine blades Stage 1 Turbine blades Stage 2 Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut Rotor assembly Compressor Inlet casing Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3 Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Outer Diffuser Inner Diffuser Turbine exhaust casing Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing Gas turbine complete Factory Assembly MB000125

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054 2015_22-SAG-EEHC-T-001054

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MQC040

EG1019-22MB-&MQC040-351914

508315613 -

Manufacturer’s Declaration

FR

INFO

2015_22-SAG-EEHC-T-001055

2017-07-25

&MQC040

EG1019-22MB-&MQC040-351915

508315620 -

Cover

FR

INFO

2015_22-SAG-EEHC-T-001055

2017-07-25

&MQC040 &MQC040 &MQC040

EG1019-22MB-&MQC040-351916 EG1019-22MB-&MQC040-351917 EG1019-22MB-&MQC040-351918

508315637 508315644 508315651 -

Table of contents Witness program Front hollow shaft

FR FR FR

INFO INFO INFO

2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055

2017-07-25 2017-07-25 2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-21MB-&MQC040-351957 EG1019-21MB-&MQC040-351958 EG1019-21MB-&MQC040-351959 EG1019-21MB-&MQC040-351960 EG1019-21MB-&MQC040-351961

508316184 508316191 508316306 508316313 508316320

&MQC040 &MQC040 &MQC040

EG1019-21MB-&MQC040-351962 EG1019-21MB-&MQC040-351963 EG1019-21MB-&MQC040-351964

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

Originator: [ADM]

-

-

Page 22 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-22MB-&MQC040-351919 EG1019-22MB-&MQC040-351920 EG1019-22MB-&MQC040-351921 EG1019-22MB-&MQC040-351922 EG1019-22MB-&MQC040-351923 EG1019-22MB-&MQC040-351924 EG1019-22MB-&MQC040-351925 EG1019-22MB-&MQC040-351926 EG1019-22MB-&MQC040-351927 EG1019-22MB-&MQC040-351928 EG1019-22MB-&MQC040-351929 EG1019-22MB-&MQC040-351930 EG1019-22MB-&MQC040-351931 EG1019-22MB-&MQC040-351932 EG1019-22MB-&MQC040-351933 EG1019-22MB-&MQC040-351934

508315668 508315675 508315682 508315699 508315705 508315712 508315729 508315736 508315743 508315750 508315767 508315774 508315781 508315798 508315804 508315811

-

Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13 Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4 Spacer discs part 1 - 4 Turbine blades Stage 1 Turbine blades Stage 2 Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut Rotor assembly Compressor Inlet casing

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-22MB-&MQC040-351935 EG1019-22MB-&MQC040-351936 EG1019-22MB-&MQC040-351937 EG1019-22MB-&MQC040-351938 EG1019-22MB-&MQC040-351939 EG1019-22MB-&MQC040-351940 EG1019-22MB-&MQC040-351941 EG1019-22MB-&MQC040-351942 EG1019-22MB-&MQC040-351943 EG1019-22MB-&MQC040-351944 EG1019-22MB-&MQC040-351945 EG1019-22MB-&MQC040-351946 EG1019-22MB-&MQC040-351947 EG1019-22MB-&MQC040-351948 EG1019-22MB-&MQC040-351949 EG1019-22MB-&MQC040-351950 EG1019-22MB-&MQC040-351951 EG1019-22MB-&MQC040-351952 EG1019-22MB-&MQC040-351953 EG1019-22MB-&MQC040-352076 EG1019-31MB-&MQC040-351831 EG1019-31MB-&MQC040-351871 EG1019-31MB-&MQC040-351872 EG1019-31MB-&MQC040-351873 EG1019-31MB-&MQC040-351874 EG1019-31MB-&MQC040-351875 EG1019-31MB-&MQC040-351876 EG1019-31MB-&MQC040-351877 EG1019-31MB-&MQC040-351878 EG1019-31MB-&MQC040-351879 EG1019-31MB-&MQC040-351880 EG1019-31MB-&MQC040-351881

508315828 508315835 508315842 508315859 508315866 508315873 508315880 508315897 508315903 508315910 508315927 508315934 508315941 508315958 508315965 508315972 508315989 508315996 508316009 508319475 503428783 503551375 503551382 503551399 503551405 503551412 503551429 503551436 503551443 503551450 503551467 503551474

-

Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3 Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Outer Diffuser Inner Diffuser Turbine exhaust casing Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing Gas turbine complete Factory Assembly MB000126 Factory Assembly MB000081 Cover Table of contents Witness program Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13 Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4 Spacer discs part 1 - 4

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001055 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

Originator: [ADM]

Page 23 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-31MB-&MQC040-351882 EG1019-31MB-&MQC040-351883 EG1019-31MB-&MQC040-351884 EG1019-31MB-&MQC040-351885 EG1019-31MB-&MQC040-351886 EG1019-31MB-&MQC040-351887 EG1019-31MB-&MQC040-351888 EG1019-31MB-&MQC040-351889 EG1019-31MB-&MQC040-351890 EG1019-31MB-&MQC040-351891 EG1019-31MB-&MQC040-351892

503551481 503551498 503551504 503551511 503551528 503551535 503551542 503551559 503551566 503551573 503551580

-

Turbine blades Stage 1 Turbine blades Stage 2 Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut Rotor assembly Compressor Inlet casing Compressor vane carrier 1 Compressor vane carrier 2

FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MQC040

EG1019-31MB-&MQC040-351893

503551597 -

Compressor vane carrier 3

FR

INFO

2015_22-SAG-EEHC-T-001056

2017-07-25

&MQC040

EG1019-31MB-&MQC040-351894

503551603 -

Compressor vane carrier 4

FR

INFO

2015_22-SAG-EEHC-T-001056

2017-07-25

&MQC040

EG1019-31MB-&MQC040-351895

503551610 -

Compressor vanes stages 0 - 3

FR

INFO

2015_22-SAG-EEHC-T-001056

2017-07-25

&MQC040 &MQC040

EG1019-31MB-&MQC040-351896 EG1019-31MB-&MQC040-351897

503551627 503551634 -

Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056

2017-07-25 2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-31MB-&MQC040-351898 EG1019-31MB-&MQC040-351899 EG1019-31MB-&MQC040-351900 EG1019-31MB-&MQC040-351901 EG1019-31MB-&MQC040-351902 EG1019-31MB-&MQC040-351903 EG1019-31MB-&MQC040-351904

503551641 503551658 503551665 503551672 503551689 503551696 503551702

-

Outer Diffuser Inner Diffuser Turbine exhaust casing Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2

FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-31MB-&MQC040-351905 EG1019-31MB-&MQC040-351906 EG1019-31MB-&MQC040-351907 EG1019-31MB-&MQC040-351908 EG1019-31MB-&MQC040-351909 EG1019-31MB-&MQC040-351913 EG1019-32MB-&MQC040-351789 EG1019-32MB-&MQC040-351790

503551719 503551726 503551733 503551740 503551757 508314784 503428257 503428264

-

Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing Gas turbine complete Manufacturer’s Declaration Cover Table of contents

FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001056 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-32MB-&MQC040-351791 EG1019-32MB-&MQC040-351792 EG1019-32MB-&MQC040-351793 EG1019-32MB-&MQC040-351794 EG1019-32MB-&MQC040-351795

503428271 503428288 503428295 503428400 503428417

-

Witness program Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13

FR FR FR FR FR

INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040

EG1019-32MB-&MQC040-351796 EG1019-32MB-&MQC040-351797 EG1019-32MB-&MQC040-351798 EG1019-32MB-&MQC040-351799

503428424 503428431 503428448 503428455

-

Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4 Spacer discs part 1 - 4

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057

2017-07-25 2017-07-25 2017-07-25 2017-07-25

Originator: [ADM]

Page 24 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-32MB-&MQC040-351800 EG1019-32MB-&MQC040-351801 EG1019-32MB-&MQC040-351802 EG1019-32MB-&MQC040-351803 EG1019-32MB-&MQC040-351804 EG1019-32MB-&MQC040-351805 EG1019-32MB-&MQC040-351806 EG1019-32MB-&MQC040-351807 EG1019-32MB-&MQC040-351808 EG1019-32MB-&MQC040-351809 EG1019-32MB-&MQC040-351810 EG1019-32MB-&MQC040-351811 EG1019-32MB-&MQC040-351812 EG1019-32MB-&MQC040-351813 EG1019-32MB-&MQC040-351814 EG1019-32MB-&MQC040-351815 EG1019-32MB-&MQC040-351816 EG1019-32MB-&MQC040-351817 EG1019-32MB-&MQC040-351818 EG1019-32MB-&MQC040-351819 EG1019-32MB-&MQC040-351820 EG1019-32MB-&MQC040-351821 EG1019-32MB-&MQC040-351822 EG1019-32MB-&MQC040-351823 EG1019-32MB-&MQC040-351824 EG1019-32MB-&MQC040-351825 EG1019-32MB-&MQC040-351826 EG1019-32MB-&MQC040-351827 EG1019-32MB-&MQC040-351830 EG1019-32MB-&MQC040-351912 EG1019-41MB-&MQC040-351751 EG1019-41MB-&MQC040-351752 EG1019-41MB-&MQC040-351753 EG1019-41MB-&MQC040-351754 EG1019-41MB-&MQC040-351755 EG1019-41MB-&MQC040-351756 EG1019-41MB-&MQC040-351757 EG1019-41MB-&MQC040-351758 EG1019-41MB-&MQC040-351759 EG1019-41MB-&MQC040-351760 EG1019-41MB-&MQC040-351761 EG1019-41MB-&MQC040-351762 EG1019-41MB-&MQC040-351763 EG1019-41MB-&MQC040-351764 EG1019-41MB-&MQC040-351765 EG1019-41MB-&MQC040-351766 EG1019-41MB-&MQC040-351767 EG1019-41MB-&MQC040-351768

Originator: [ADM]

UNID 503428462 503428479 503428486 503428493 503428509 503428516 503428523 503428530 503428547 503428554 503428561 503428578 503428585 503428592 503428608 503428615 503428622 503428639 503428646 503428653 503428660 503428677 503428684 503428691 503428707 503428714 503428721 503428738 503428776 508314777 503427250 503427267 503427274 503427281 503427298 503427908 503427915 503427922 503427939 503427946 503427953 503427960 503427977 503427984 503427991 503428004 503428011 503428028

Rev. A -

Document Title Turbine blades Stage 1 Turbine blades Stage 2 Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut Rotor assembly Compressor Inlet casing Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3 Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Outer Diffuser Inner Diffuser Turbine exhaust casing Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing Gas turbine complete Factory Assembly MB000030 Manufacturer’s Declaration Cover Table of contents Witness program Front hollow shaft Compressor discs stages 2 - 13 Compressor blades stages 1 - 6 Compressor blades stages 7 - 13 Torque discs part 1 - 3 Turbine discs stages 1 - 2 Turbine discs stages 3 - 4 Spacer discs part 1 - 4 Turbine blades Stage 1 Turbine blades Stage 2 Turbine blades stage 3 Turbine blades stage 4 Rear hollow shaft Tie rod Tie rod nut

Page 25 of 33

Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

Letter No 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001057 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058

Delivery Date 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-41MB-&MQC040-351769 EG1019-41MB-&MQC040-351770 EG1019-41MB-&MQC040-351771 EG1019-41MB-&MQC040-351772 EG1019-41MB-&MQC040-351773 EG1019-41MB-&MQC040-351774 EG1019-41MB-&MQC040-351775

503428035 503428042 503428059 503428066 503428073 503428080 503428097

-

Rotor assembly Compressor Inlet casing Compressor vane carrier 1 Compressor vane carrier 2 Compressor vane carrier 3 Compressor vane carrier 4 Compressor vanes stages 0 - 3

FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040

EG1019-41MB-&MQC040-351776 EG1019-41MB-&MQC040-351777 EG1019-41MB-&MQC040-351778 EG1019-41MB-&MQC040-351779

503428103 503428110 503428127 503428134

-

Compressor vanes stages 4 - 6 Compressor vanes stages 7 - 13, OGV Inner Diffuser Turbine exhaust casing

FR FR FR FR

INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058

2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MQC040 &MAB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MTB030 &MTB030 &MTB030 &MAB010 &MPB010 &MPB010 &MPB010 &MPB010

EG1019-41MB-&MQC040-351780 EG1019-41MB-&MQC040-351781 EG1019-41MB-&MQC040-351782 EG1019-41MB-&MQC040-351783 EG1019-41MB-&MQC040-351784 EG1019-41MB-&MQC040-351785 EG1019-41MB-&MQC040-351786 EG1019-41MB-&MQC040-351787 EG1019-41MB-&MQC040-351788 EG1019-41MB-&MQC040-351828 EG1019-41MB-&MQC040-351911 EG1019-12MB-&MAB010-351177 EG1019-12MB-&MPB010-351178 EG1019-12MB-&MPB010-351179 EG1019-12MB-&MPB010-351180 EG1019-12MB-&MPB010-351181 EG1019-12MB-&MPB010-351182 EG1019-12MB-&MPB010-351186 EG1019-12MB-&MTB030-351183 EG1019-12MB-&MTB030-351184 EG1019-12MB-&MTB030-351185 EG1019-21MB-&MAB010-351164 EG1019-21MB-&MPB010-351165 EG1019-21MB-&MPB010-351166 EG1019-21MB-&MPB010-351167 EG1019-21MB-&MPB010-351168

503428141 503428158 503428165 503428172 503428189 503428196 503428202 503428219 503428226 503428752 508314760 508243046 508243053 508243060 508243077 508243084 508243091 508243138 508243107 508243114 508243121 508242919 508242926 508242933 508242940 508242957

-

Bearing body Turbine vane carrier Turbine vanes stage 1 Turbine vanes stages 2 Turbine vanes stages 3 Turbine vanes stages 4 Cylinder Outer Casing Cone Outer Casing Gas turbine complete Factory Assembly 800860 Manufacturer’s Declaration Table of Contents Allocation Table, Component Class to GPC Allocation Table, GPC to Component Class Reference List for Spare Parts List Reference Table (ordered by Functional Unit No.) Reference Table (ordered alphabetically) Spare Parts List General Overview Core Turbine Auxiliaries Table of Contents Allocation Table, Component Class to GPC Allocation Table, GPC to Component Class Reference List for Spare Parts List Reference Table (ordered by Functional Unit No.)

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001058 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MPB010

EG1019-21MB-&MPB010-351169

508242964 -

Reference Table (ordered alphabetically)

FR

INFO

2015_22-SAG-EEHC-T-001059

2017-07-25

&MPB010

EG1019-21MB-&MPB010-351173

508243008 -

Spare Parts List

FR

INFO

2015_22-SAG-EEHC-T-001059

2017-07-25

&MPB010

EG1019-21MB-&MPB010-351174

508243015 -

WB Item-ID to Item-ID, TIN and Item Position

FR

INFO

2015_22-SAG-EEHC-T-001059

2017-07-25

Originator: [ADM]

Page 26 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MPB010

EG1019-21MB-&MPB010-351175

508243022 -

Item-ID to WB Item-ID, TIN and Item Position

FR

INFO

2015_22-SAG-EEHC-T-001059

2017-07-25

&MTB030 &MTB030

EG1019-21MB-&MTB030-351170 EG1019-21MB-&MTB030-351171

508242971 508242988 -

General Overview Core Turbine

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059

2017-07-25 2017-07-25

&MTB030 &MTB030

EG1019-21MB-&MTB030-351172 EG1019-21MB-&MTB030-351176

508242995 508243039 -

Auxiliaries Spare Parts Drawings

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059

2017-07-25 2017-07-25

&MAB010

EG1019-22MB-&MAB010-351151

508242377 -

Table of Contents

FR

INFO

2015_22-SAG-EEHC-T-001059

2017-07-25

&MPB010

EG1019-22MB-&MPB010-351152

508242384 -

Allocation Table, Component Class to GPC

FR

INFO

2015_22-SAG-EEHC-T-001059

2017-07-25

&MPB010

EG1019-22MB-&MPB010-351153

508242391 -

Allocation Table, GPC to Component Class

FR

INFO

2015_22-SAG-EEHC-T-001059

2017-07-25

&MPB010

EG1019-22MB-&MPB010-351154

508242803 -

Reference List for Spare Parts List

FR

INFO

2015_22-SAG-EEHC-T-001059

2017-07-25

&MPB010

EG1019-22MB-&MPB010-351155

508242810 -

Reference Table (ordered by Functional Unit No.)

FR

INFO

2015_22-SAG-EEHC-T-001059

2017-07-25

&MPB010

EG1019-22MB-&MPB010-351156

508242827 -

Reference Table (ordered alphabetically)

FR

INFO

2015_22-SAG-EEHC-T-001059

2017-07-25

&MPB010 &MPB010 &MPB010 &MTB030 &MTB030 &MTB030 &MTB030 &MDB060 &MDB060 &MDB060 &MDB060 &MPA020 &MPA030 &MPA030 &MAB010 &MAB010 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010

EG1019-22MB-&MPB010-351160 EG1019-22MB-&MPB010-351161 EG1019-22MB-&MPB010-351162 EG1019-22MB-&MTB030-351157 EG1019-22MB-&MTB030-351158 EG1019-22MB-&MTB030-351159 EG1019-22MB-&MTB030-351163 EG1019-MB-&MDB060-351004 EG1019-MB-&MDB060-351070 EG1019-MB-&MDB060-351072 EG1019-MB-&MDB060-351074 EG1019-MB-&MPA020-351071 EG1019-MB-&MPA030-351069 EG1019-MB-&MPA030-351073 EG1019-11MB-&MAB010-351190 EG1019-11MB-&MAB010-351326 EG1019-11MB-&MDB060-351324 EG1019-11MB-&MDB060-351325 EG1019-11MB-&MDB060-351327 EG1019-11MB-&MDB060-351328 EG1019-11MB-&MPB010-351191 EG1019-11MB-&MPB010-351192 EG1019-11MB-&MPB010-351193 EG1019-11MB-&MPB010-351194 EG1019-11MB-&MPB010-351195 EG1019-11MB-&MPB010-351199 EG1019-11MB-&MPB010-351200

508242872 508242889 508242896 508242834 508242841 508242858 508242902 503429056 503525970 503525994 503526014 503525987 503525963 503526007 508243312 508384565 508384534 508384541 508384589 508384602 508243329 508243336 508243343 508243350 508243367 508243404 508243411

Spare Parts List WB Item-ID to Item-ID, TIN and Item Position Item-ID to WB Item-ID, TIN and Item Position General Overview Core Turbine Auxiliaries Spare Parts Drawings Notes on Using the Spare Parts Catalog List of Measuring Instruments, Explanations List of Electrical Loads, Explanations Equipment List, Explanations List of Electrical Loads List of Measuring Instruments Equipment List Table of Contents Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions Code of Hand Signals Allocation Table, Component Class to GPC Allocation Table, GPC to Component Class Reference List for Spare Parts List Reference Table (ordered by Functional Unit No.) Reference Table (ordered alphabetically) Spare Parts List WB Item-ID to Item-ID, TIN and Item Position

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

Originator: [ADM]

A A A A A A A -

Page 27 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

&MPB010 &MPB010 &MTB030 &MTB030 &MTB030 &MTB030 &MTB030 &MAB010 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MPB010 &MPB010 &MTB030 &MTB030 &MAB010 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MTB030 &MAB010 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MTB030 &MAB010 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MTB030 &MAB010 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MTB030 &MAB010 &MDB060 &MDB060 &MDB060

EG1019-11MB-&MPB010-351201 EG1019-11MB-&MPB010-351329 EG1019-11MB-&MTB030-351196 EG1019-11MB-&MTB030-351197 EG1019-11MB-&MTB030-351198 EG1019-11MB-&MTB030-351202 EG1019-11MB-&MTB030-351330 EG1019-12MB-&MAB010-351319 EG1019-12MB-&MDB060-351317 EG1019-12MB-&MDB060-351318 EG1019-12MB-&MDB060-351320 EG1019-12MB-&MDB060-351321 EG1019-12MB-&MPB010-351187 EG1019-12MB-&MPB010-351188 EG1019-12MB-&MPB010-351322 EG1019-12MB-&MTB030-351189 EG1019-12MB-&MTB030-351323 EG1019-21MB-&MAB010-351312 EG1019-21MB-&MDB060-351310 EG1019-21MB-&MDB060-351311 EG1019-21MB-&MDB060-351313 EG1019-21MB-&MDB060-351314 EG1019-21MB-&MPB010-351315 EG1019-21MB-&MTB030-351316 EG1019-22MB-&MAB010-351305 EG1019-22MB-&MDB060-351303 EG1019-22MB-&MDB060-351304 EG1019-22MB-&MDB060-351306 EG1019-22MB-&MDB060-351307 EG1019-22MB-&MPB010-351308 EG1019-22MB-&MTB030-351309 EG1019-31MB-&MAB010-351298 EG1019-31MB-&MDB060-351296 EG1019-31MB-&MDB060-351297 EG1019-31MB-&MDB060-351299 EG1019-31MB-&MDB060-351300 EG1019-31MB-&MPB010-351301 EG1019-31MB-&MTB030-351302 EG1019-32MB-&MAB010-351291 EG1019-32MB-&MDB060-351289 EG1019-32MB-&MDB060-351290 EG1019-32MB-&MDB060-351292 EG1019-32MB-&MDB060-351293 EG1019-32MB-&MPB010-351294 EG1019-32MB-&MTB030-351295 EG1019-41MB-&MAB010-351250 EG1019-41MB-&MDB060-351248 EG1019-41MB-&MDB060-351249 EG1019-41MB-&MDB060-351251

Originator: [ADM]

UNID 508243428 508384619 508243374 508243381 508243398 508244265 508384633 508383612 508383193 508383605 508383629 508383636 508243145 508243152 508383643 508243169 508383650 508383148 508383124 508383131 508383155 508383162 508383179 508383186 508383070 508383056 508383063 508383087 508383094 508383100 508383117 508382776 508382752 508382769 508382783 508382790 508382905 508382912 508379578 508379554 508379561 508379585 508379592 508379806 508379813 508379011 508378199 508379004 508379028

Rev. -

Document Title Item-ID to WB Item-ID, TIN and Item Position Tool List MBTLD06 General Overview Core Turbine Auxiliaries Spare Parts Drawings Drawing MBTLD06 Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions Code of Hand Signals WB Item-ID to Item-ID, TIN and Item Position Item-ID to WB Item-ID, TIN and Item Position Tool List MBTLD06 Spare Parts Drawings Drawing MBTLD06 Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions Code of Hand Signals Tool List MBTLD06 Drawing MBTLD06 Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions Code of Hand Signals Tool List MBTLD06 Drawing MBTLD06 Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions Code of Hand Signals Tool List MBTLD06 Drawing MBTLD06 Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions Code of Hand Signals Tool List MBTLD06 Drawing MBTLD06 Table of Contents Preface Notes on Using the Tool Catalog Safety Instructions

Page 28 of 33

Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

Letter No 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

Delivery Date 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

Code of Hand Signals Operating Manual MBTLC02 Operating Manual MBTLC02 Tool Description MBTLB25 Operating Manual MBTLB25 Operating Manual MBTLB25 Operating Manual MBTLB25 Tool Description MBTLC74 Operating Manual MBTLC81 Operating Manual MBTLC81 Tool List MBTLB07 Tool List MBTLC02 Tool List MBTLC12 Tool List MBTLC21 Tool List MBTLC23 Tool List MBTLB25

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

508379257 -

Tool List MBTLC42

FR

INFO

2015_22-SAG-EEHC-T-001059-01

2017-07-25

EG1019-41MB-&MPB010-351278 EG1019-41MB-&MPB010-351283 EG1019-41MB-&MPB010-351287 EG1019-41MB-&MQC040-351262 EG1019-41MB-&MQC040-351265 EG1019-41MB-&MQC040-351271

508379288 508379332 508379370 508379127 508379158 508379219

-

Tool List MBTLC74 Tool List MBTLC81 Tool List MBTLD06 EC Declaration of Conformity MBTLC12 EC Declaration of Conformity MBTLC21 Quality Documentation for tools MBTLB25

FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MQC040

EG1019-41MB-&MQC040-351277

508379271 -

Quality Documentation for tools MBTLC42

FR

INFO

2015_22-SAG-EEHC-T-001059-01

2017-07-25

&MQC040

EG1019-41MB-&MQC040-351281

508379318 -

EC Declaration of Conformity MBTLC74

FR

INFO

2015_22-SAG-EEHC-T-001059-01

2017-07-25

&MQC040

EG1019-41MB-&MQC040-351282

508379325 -

Quality Documentation for tools MBTLC74

FR

INFO

2015_22-SAG-EEHC-T-001059-01

2017-07-25

&MTB030 &MTB030

EG1019-41MB-&MTB030-351255 EG1019-41MB-&MTB030-351257

508379059 508379073 -

Drawing MBTLB07 Drawing MBTLC02

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

2017-07-25 2017-07-25

&MTB030

EG1019-41MB-&MTB030-351261

508379110 -

Drawing MBTLC12

FR

INFO

2015_22-SAG-EEHC-T-001059-01

2017-07-25

&MTB030 &MTB030 &MTB030

EG1019-41MB-&MTB030-351264 EG1019-41MB-&MTB030-351267 EG1019-41MB-&MTB030-351269

508379141 508379172 508379196 -

Drawing MBTLC21 Drawing MBTLC23 Drawing MBTLB25

FR FR FR

INFO INFO INFO

2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

2017-07-25 2017-07-25 2017-07-25

&MTB030 &MTB030 &MTB030 &MTB030 &MAB010 &MDB060

EG1019-41MB-&MTB030-351276 EG1019-41MB-&MTB030-351279 EG1019-41MB-&MTB030-351284 EG1019-41MB-&MTB030-351288 EG1019-42MB-&MAB010-351206 EG1019-MB-&MDB060-351004

508379264 508379295 508379349 508379387 508335130 503429056

Drawing MBTLC42 Drawing MBTLC74 Drawing MBTLC81 Drawing MBTLD06 Table of Contents Notes on Using the Spare Parts Catalog

FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010

EG1019-41MB-&MDB060-351253 EG1019-41MB-&MDB060-351258 EG1019-41MB-&MDB060-351259 EG1019-41MB-&MDB060-351270 EG1019-41MB-&MDB060-351272 EG1019-41MB-&MDB060-351273 EG1019-41MB-&MDB060-351274 EG1019-41MB-&MDB060-351280 EG1019-41MB-&MDB060-351285 EG1019-41MB-&MDB060-351286 EG1019-41MB-&MPB010-351254 EG1019-41MB-&MPB010-351256 EG1019-41MB-&MPB010-351260 EG1019-41MB-&MPB010-351263 EG1019-41MB-&MPB010-351266 EG1019-41MB-&MPB010-351268

508379035 508379080 508379097 508379202 508379226 508379233 508379240 508379301 508379356 508379363 508379042 508379066 508379103 508379134 508379165 508379189

&MPB010

EG1019-41MB-&MPB010-351275

&MPB010 &MPB010 &MPB010 &MQC040 &MQC040 &MQC040

Originator: [ADM]

-

A

Page 29 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

UNID

Rev.

Document Title

Status

Purp

Letter No

Delivery Date

&MDB060 &MDB060

EG1019-42MB-&MDB060-351203 EG1019-42MB-&MDB060-351204

508335116 508335123 -

Preface Notes on Using the Tool Catalog

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

2017-07-25 2017-07-25

&MDB060 &MDB060

EG1019-42MB-&MDB060-351207 EG1019-42MB-&MDB060-351208

508335147 508335154 -

Safety Instructions Code of Hand Signals

FR FR

INFO INFO

2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

2017-07-25 2017-07-25

&MDB060 &MDB060 &MDB060 &MDB060 &MDB060 &MDB060

EG1019-42MB-&MDB060-351213 EG1019-42MB-&MDB060-351214 EG1019-42MB-&MDB060-351229 EG1019-42MB-&MDB060-351231 EG1019-42MB-&MDB060-351232 EG1019-42MB-&MDB060-351233

508335208 508335215 508335369 508335383 508335390 508335406

Operating Manual MBTLC02 Operating Manual MBTLC02 Tool Description MBTLC25 Operating Manual MBTLC25 Operating Manual MBTLC25 Operating Manual MBTLC25

FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MDB060

EG1019-42MB-&MDB060-351239

508335468 -

Tool Description MBTLC74

FR

INFO

2015_22-SAG-EEHC-T-001059-01

2017-07-25

&MDB060

EG1019-42MB-&MDB060-351244

508335512 -

Operating Manual MBTLC81

FR

INFO

2015_22-SAG-EEHC-T-001059-01

2017-07-25

&MDB060

EG1019-42MB-&MDB060-351245

508335529 -

Operating Manual MBTLC81

FR

INFO

2015_22-SAG-EEHC-T-001059-01

2017-07-25

&MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MPB010 &MQC040 &MQC040 &MQC040 &MQC040

EG1019-42MB-&MPB010-351209 EG1019-42MB-&MPB010-351211 EG1019-42MB-&MPB010-351215 EG1019-42MB-&MPB010-351217 EG1019-42MB-&MPB010-351220 EG1019-42MB-&MPB010-351222 EG1019-42MB-&MPB010-351225 EG1019-42MB-&MPB010-351227 EG1019-42MB-&MPB010-351234 EG1019-42MB-&MPB010-351237 EG1019-42MB-&MPB010-351242 EG1019-42MB-&MPB010-351246 EG1019-42MB-&MQC040-351219 EG1019-42MB-&MQC040-351224 EG1019-42MB-&MQC040-351230 EG1019-42MB-&MQC040-351236

508335161 508335185 508335222 508335246 508335277 508335291 508335321 508335345 508335413 508335444 508335499 508335536 508335260 508335314 508335376 508335437

-

Spare Parts List MBTLB07 Spare Parts List MBTLC02 Spare Parts List MBTLC11 Spare Parts List MBTLC12 Spare Parts List MBTLC13 Spare Parts List MBTLC21 Spare Parts List MBTLC23 Spare Parts List MBTLC25 Spare Parts List MBTLC42 Spare Parts List MBTLC74 Spare Parts List MBTLC81 Spare Parts List MBTLD06 EC Declaration of Conformity MBTLC12 EC Declaration of Conformity MBTLC21 Quality Documentation for tools MBTLC25 Quality Documentation for tools MBTLC42

FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25

&MQC040 &MQC040 &MTB030

EG1019-42MB-&MQC040-351240 EG1019-42MB-&MQC040-351241 EG1019-42MB-&MTB030-351210

508335475 508335482 508335178 -

EC Declaration of Conformity MBTLC74 Quality Documentation for tools MBTLC74 Tool Drawing MBTLB07

FR FR FR

INFO INFO INFO

2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

2017-07-25 2017-07-25 2017-07-25

&MTB030

EG1019-42MB-&MTB030-351212

508335192 -

Tool Drawing MBTLC02

FR

INFO

2015_22-SAG-EEHC-T-001059-01

2017-07-25

&MTB030

EG1019-42MB-&MTB030-351216

508335239 -

Tool Drawing MBTLC11

FR

INFO

2015_22-SAG-EEHC-T-001059-01

2017-07-25

&MTB030

EG1019-42MB-&MTB030-351218

508335253 -

Tool Drawing MBTLC12

FR

INFO

2015_22-SAG-EEHC-T-001059-01

2017-07-25

&MTB030 &MTB030 &MTB030

EG1019-42MB-&MTB030-351221 EG1019-42MB-&MTB030-351223 EG1019-42MB-&MTB030-351226

508335284 508335307 508335338 -

Tool Drawing MBTLC13 Tool Drawing MBTLC21 Tool Drawing MBTLC23

FR FR FR

INFO INFO INFO

2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01

2017-07-25 2017-07-25 2017-07-25

Originator: [ADM]

-

Page 30 of 33

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

&MTB030 &MTB030 &MTB030 &MTB030 &MTB030 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040

EG1019-42MB-&MTB030-351228 EG1019-42MB-&MTB030-351235 EG1019-42MB-&MTB030-351238 EG1019-42MB-&MTB030-351243 EG1019-42MB-&MTB030-351247 EG1019-11BBA-&EQC040-721086 EG1019-11BBA-&EQC040-721087 EG1019-11BBA-&EQC040-721088 EG1019-11BBA-&EQC040-721089 EG1019-12BBA-&EQC040-721091 EG1019-12BBA-&EQC040-721092 EG1019-12BBA-&EQC040-721093 EG1019-12BBA-&EQC040-721094 EG1019-00BHA-&EQC040-723129 EG1019-00BHB-&EQC040-723130 EG1019-00BHC-&EQC040-723131 EG1019-00BHD-&EQC040-723132 EG1019-00BMA-&EQC040-723133 EG1019-00BUA-&EQC040-723134 EG1019-00BUB-&EQC040-723135 EG1019-10BFA-&EQC040-723136 EG1019-10BFB-&EQC040-723137 EG1019-10BMA-&EQC040-723138 EG1019-10BUA-&EQC040-723139 EG1019-10BUB-&EQC040-723140 EG1019-B-&EQC010-723172 EG1019-11BFF-&EQC040-723141 EG1019-11BMF-&EQC040-723142 EG1019-B-&EQC010-723172 EG1019-12BFF-&EQC040-723143 EG1019-12BMF-&EQC040-723144 EG1019-B-&EQC010-723172 EG1019-20BFA-&EQC040-723145 EG1019-20BFB-&EQC040-723146 EG1019-20BMA-&EQC040-723147 EG1019-20BUA-&EQC040-723148 EG1019-20BUB-&EQC040-723149 EG1019-B-&EQC010-723172 EG1019-21BFF-&EQC040-723150 EG1019-21BMF-&EQC040-723151 EG1019-B-&EQC010-723172 EG1019-22BFF-&EQC040-723152 EG1019-22BMF-&EQC040-723153 EG1019-B-&EQC010-723172 EG1019-30BFA-&EQC040-723154 EG1019-30BFB-&EQC040-723155 EG1019-30BMA-&EQC040-723156 EG1019-30BUA-&EQC040-723157 EG1019-30BUB-&EQC040-723158

Originator: [ADM]

UNID 508335352 508335420 508335451 508335505 508335543 449335398 449335404 449335411 449335428 449335442 449335459 449335466 449335473 505628921 505628938 505628945 505628952 505628969 505628976 505628983 449334773 449334780 449334797 449334803 449334810 449335367 449334827 449334834 449335367 449334841 449334858 449335367 449334865 449334872 449334889 449334896 449334902 449335367 449334919 449334926 449335367 449334933 449334940 449335367 449334957 449334964 449334971 449334988 449334995

Rev. A A A A A A A -

Document Title Tool Drawing MBTLC25 Tool Drawing MBTLC42 Tool Drawing MBTLC74 Tool Drawing MBTLC81 Tool Drawing MBTLD06 Test Certificate 11BBA Test Reports Circuit Breakers Test Reports Current Transformers and Voltage Transformers Test Certificate Protection Relays Test Certificate 12BBA Test Reports Circuit Breakers Test Reports Current Transformers and Voltage Transformers Test Certificate Protection Relays Test Certificate 00BHA Test Certificate 00BHB Test Certificate 00BHC Test Certificate 00BHD Test Certificate 00BMA Test Certificate 00BUA Test Certificate 00BUB Test Certificate 10BFA Test Certificate 10BFB Test Certificate 10BMA Test Certificate 10BUA Test Certificate 10BUB Declaration of Conformity Test Certificate 11BFF Test Certificate 11BMF Declaration of Conformity Test Certificate 12BFF Test Certificate 12BMF Declaration of Conformity Test Certificate 20BFA Test Certificate 20BFB Test Certificate 20BMA Test Certificate 20BUA Test Certificate 20BUB Declaration of Conformity Test Certificate 21BFF Test Certificate 21BMF Declaration of Conformity Test Certificate 22BFF Test Certificate 22BMF Declaration of Conformity Test Certificate 30BFA Test Certificate 30BFB Test Certificate 30BMA Test Certificate 30BUA Test Certificate 30BUB

Page 31 of 33

Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

Letter No 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001059-01 2015_22-SAG-EEHC-T-001060 2015_22-SAG-EEHC-T-001060 2015_22-SAG-EEHC-T-001060 2015_22-SAG-EEHC-T-001060 2015_22-SAG-EEHC-T-001061 2015_22-SAG-EEHC-T-001061 2015_22-SAG-EEHC-T-001061 2015_22-SAG-EEHC-T-001061 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001062 2015_22-SAG-EEHC-T-001063 2015_22-SAG-EEHC-T-001063 2015_22-SAG-EEHC-T-001063 2015_22-SAG-EEHC-T-001063 2015_22-SAG-EEHC-T-001063 2015_22-SAG-EEHC-T-001063 2015_22-SAG-EEHC-T-001064 2015_22-SAG-EEHC-T-001064 2015_22-SAG-EEHC-T-001064 2015_22-SAG-EEHC-T-001065 2015_22-SAG-EEHC-T-001065 2015_22-SAG-EEHC-T-001065 2015_22-SAG-EEHC-T-001066 2015_22-SAG-EEHC-T-001066 2015_22-SAG-EEHC-T-001066 2015_22-SAG-EEHC-T-001066 2015_22-SAG-EEHC-T-001066 2015_22-SAG-EEHC-T-001066 2015_22-SAG-EEHC-T-001067 2015_22-SAG-EEHC-T-001067 2015_22-SAG-EEHC-T-001067 2015_22-SAG-EEHC-T-001068 2015_22-SAG-EEHC-T-001068 2015_22-SAG-EEHC-T-001068 2015_22-SAG-EEHC-T-001069 2015_22-SAG-EEHC-T-001069 2015_22-SAG-EEHC-T-001069 2015_22-SAG-EEHC-T-001069 2015_22-SAG-EEHC-T-001069

Delivery Date 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-25 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

&EQC010 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC040 &EQC040 &EQC040 &EQC010 &EQC040 &EQC040 &EQC010 &EQC010 &EQC040 &EQC040 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC070 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040

EG1019-B-&EQC010-723172 EG1019-31BFF-&EQC040-723159 EG1019-31BMF-&EQC040-723160 EG1019-B-&EQC010-723172 EG1019-32BFF-&EQC040-723161 EG1019-32BMF-&EQC040-723162 EG1019-B-&EQC010-723172 EG1019-40BFA-&EQC040-723163 EG1019-40BFB-&EQC040-723164 EG1019-40BMA-&EQC040-723165 EG1019-40BUA-&EQC040-723166 EG1019-40BUB-&EQC040-723167 EG1019-B-&EQC010-723172 EG1019-41BFF-&EQC040-723168 EG1019-41BMF-&EQC040-723169 EG1019-B-&EQC010-723172 EG1019-B-&EQC010-723172 EG1019-42BFF-&EQC040-723170 EG1019-42BMF-&EQC040-723171 EG1019-11MPB20-&MQC040-629950 EG1019-11MPB20-&MQC040-629951 EG1019-11MPB20-&MQC070-629959 EG1019-11MPB20-&MDA010-713913 EG1019-11MPB20-&MDA010-713912 EG1019-11MPB20-&MQC040-713911 EG1019-11MPB20-&MQC040-713910 EG1019-12MPB20-&MQC040-629951 EG1019-12MPB20-&MQC040-629950 EG1019-12MPB20-&MQC070-629959 EG1019-21MPB20-&MQC040-629951 EG1019-21MPB20-&MQC040-629950 EG1019-21MPB20-&MQC070-629959 EG1019-21MPB20-&MDA010-713913 EG1019-21MPB20-&MDA010-713912 EG1019-21MPB20-&MQC040-713911 EG1019-21MPB20-&MQC040-713910 EG1019-22MPB20-&MQC040-629951 EG1019-22MPB20-&MQC040-629950 EG1019-22MPB20-&MQC070-629959 EG1019-22MPB20-&MDA010-713913 EG1019-22MPB20-&MDA010-713912 EG1019-22MPB20-&MQC040-713911 EG1019-22MPB20-&MQC040-713910 EG1019-31MPB20-&MQC040-629951 EG1019-31MPB20-&MQC040-629950 EG1019-31MPB20-&MQC070-629959 EG1019-31MPB20-&MDA010-713913 EG1019-31MPB20-&MDA010-713912 EG1019-31MPB20-&MQC040-713911

Originator: [ADM]

UNID 449335367 449335008 449335015 449335367 449335022 449335039 449335367 449335046 449335053 449335060 449335077 449335084 449335367 449335091 449335107 449335367 449335367 449335114 449335121 498160026 498160033 498160217 508479407 508479414 508479421 508479438 508380369 508380376 508380352 508380512 508380529 508380505 508479681 508479698 508479704 508479711 508380567 508380574 508380550 508479643 508479650 508479667 508479674 508380611 508380628 508380604 508479605 508479612 508479629

Rev. -

Document Title Declaration of Conformity Test Certificate 31BFF Test Certificate 31BMF Declaration of Conformity Test Certificate 32BFF Test Certificate 32BMF Declaration of Conformity Test Certificate 40BFA Test Certificate 40BFB Test Certificate 40BMA Test Certificate 40BUA Test Certificate 40BUB Declaration of Conformity Test Certificate 41BFF Test Certificate 41BMF Declaration of Conformity Declaration of Conformity Test Certificate 42BFF Test Certificate 42BMF Cover Sheet Table of Content List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice ARS METAL Table of Content Cover Sheet List of Materials with Lot Numbers Table of Content Cover Sheet List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice ARS METAL Table of Content Cover Sheet List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice ARS METAL Table of Content Cover Sheet List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice

Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

Page 32 of 33

Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

Letter No 2015_22-SAG-EEHC-T-001069 2015_22-SAG-EEHC-T-001070 2015_22-SAG-EEHC-T-001070 2015_22-SAG-EEHC-T-001070 2015_22-SAG-EEHC-T-001071 2015_22-SAG-EEHC-T-001071 2015_22-SAG-EEHC-T-001071 2015_22-SAG-EEHC-T-001072 2015_22-SAG-EEHC-T-001072 2015_22-SAG-EEHC-T-001072 2015_22-SAG-EEHC-T-001072 2015_22-SAG-EEHC-T-001072 2015_22-SAG-EEHC-T-001072 2015_22-SAG-EEHC-T-001073 2015_22-SAG-EEHC-T-001073 2015_22-SAG-EEHC-T-001073 2015_22-SAG-EEHC-T-001074 2015_22-SAG-EEHC-T-001074 2015_22-SAG-EEHC-T-001074 2015_22-SAG-EEHC-T-001075 2015_22-SAG-EEHC-T-001075 2015_22-SAG-EEHC-T-001075 2015_22-SAG-EEHC-T-001076 2015_22-SAG-EEHC-T-001076 2015_22-SAG-EEHC-T-001076 2015_22-SAG-EEHC-T-001076 2015_22-SAG-EEHC-T-001077 2015_22-SAG-EEHC-T-001077 2015_22-SAG-EEHC-T-001077 2015_22-SAG-EEHC-T-001079 2015_22-SAG-EEHC-T-001079 2015_22-SAG-EEHC-T-001079 2015_22-SAG-EEHC-T-001080 2015_22-SAG-EEHC-T-001080 2015_22-SAG-EEHC-T-001080 2015_22-SAG-EEHC-T-001080 2015_22-SAG-EEHC-T-001081 2015_22-SAG-EEHC-T-001081 2015_22-SAG-EEHC-T-001081 2015_22-SAG-EEHC-T-001082 2015_22-SAG-EEHC-T-001082 2015_22-SAG-EEHC-T-001082 2015_22-SAG-EEHC-T-001082 2015_22-SAG-EEHC-T-001083 2015_22-SAG-EEHC-T-001083 2015_22-SAG-EEHC-T-001083 2015_22-SAG-EEHC-T-001084 2015_22-SAG-EEHC-T-001084 2015_22-SAG-EEHC-T-001084

Delivery Date 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28

Date: 09.08.2017


x

List of Documents

x

EG1019

2017-08-09

x DCC

Drawing No

&MQC040 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040 &MQC040 &MQC040 &MQC040 &MQC070 &MDA010 &MDA010 &MQC040 &MQC040 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010 &EDC010

EG1019-31MPB20-&MQC040-713910 EG1019-32MPB20-&MQC040-629951 EG1019-32MPB20-&MQC040-629950 EG1019-32MPB20-&MQC070-629959 EG1019-32MPB20-&MDA010-713913 EG1019-32MPB20-&MDA010-713912 EG1019-32MPB20-&MQC040-713911 EG1019-32MPB20-&MQC040-713910 EG1019-41MPB20-&MQC040-629951 EG1019-41MPB20-&MQC040-629950 EG1019-41MPB20-&MQC070-629959 EG1019-41MPB20-&MDA010-713913 EG1019-41MPB20-&MDA010-713912 EG1019-41MPB20-&MQC040-713911 EG1019-41MPB20-&MQC040-713910 EG1019-42MPB20-&MQC040-629951 EG1019-42MPB20-&MQC040-629950 EG1019-42MPB20-&MQC070-629959 EG1019-42MPB20-&MDA010-713913 EG1019-42MPB20-&MDA010-713912 EG1019-42MPB20-&MQC040-713911 EG1019-42MPB20-&MQC040-713910 EG1019-LCA-&EDC010-810687 EG1019-C-&EDC010-810682 EG1019-LAB-&EDC010-810681 EG1019-LAB-&EDC010-810684 EG1019-LAB-&EDC010-810685 EG1019-LAE-&EDC010-810683 EG1019-LBA-&EDC010-810688 EG1019-C-&EDC010-810689 EG1019-LBA-&EDC010-810690 EG1019-LCA-&EDC010-810686

Originator: [ADM]

UNID 508479636 508380666 508380673 508380659 508479568 508479575 508479582 508479599 508380710 508380727 508380703 508479520 508479537 508479544 508479551 508380765 508380772 508380758 508479483 508479490 508479506 508479513 508517987 508517932 508517925 508517956 508517963 508517949 508517994 508518007 508518014 508517970

Rev. -

Document Title ARS METAL Table of Content Cover Sheet List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice ARS METAL Table of Content Cover Sheet List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice ARS METAL Table of Content Cover Sheet List of Materials with Lot Numbers Tacke und Lindemann Frenzelit Steel Kosice ARS METAL Seiko_Meter run with orifice 14" 300lbs_O&M Manual Seiko_Meter run with orifice 4" 900lbs_O&M Manual Seiko_Meter run with orifice 4" 300lbs_O&M Manual Seiko_Meter run with orifice 6" 900lbs_O&M Manual Seiko_Meter run with orifice 10"_O&M Manual Seiko_Meter run with orifice 4" 2500lbs_O&M Manual Seiko_Meter run with nozzle ID 240_O&M Manual Seiko_ISA 1932 Nozzle 12"_O&M Manual Seiko_ISA 1932 Nozzle 16"_O&M Manual Seiko_Meter run with orifice 12" 300lbs_O&M Manual

Page 33 of 33

Status FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR FR

Purp INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO INFO

Letter No 2015_22-SAG-EEHC-T-001084 2015_22-SAG-EEHC-T-001085 2015_22-SAG-EEHC-T-001085 2015_22-SAG-EEHC-T-001085 2015_22-SAG-EEHC-T-001086 2015_22-SAG-EEHC-T-001086 2015_22-SAG-EEHC-T-001086 2015_22-SAG-EEHC-T-001086 2015_22-SAG-EEHC-T-001087 2015_22-SAG-EEHC-T-001087 2015_22-SAG-EEHC-T-001087 2015_22-SAG-EEHC-T-001088 2015_22-SAG-EEHC-T-001088 2015_22-SAG-EEHC-T-001088 2015_22-SAG-EEHC-T-001088 2015_22-SAG-EEHC-T-001089 2015_22-SAG-EEHC-T-001089 2015_22-SAG-EEHC-T-001089 2015_22-SAG-EEHC-T-001090 2015_22-SAG-EEHC-T-001090 2015_22-SAG-EEHC-T-001090 2015_22-SAG-EEHC-T-001090 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091 2015_22-SAG-EEHC-T-001091

Delivery Date 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28 2017-07-28

Date: 09.08.2017


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

A 5. Financial Report

Intern Siemens

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Burullus 4800 MW COMBINED CYCLE POWER PLANT Contract No.: CAIRO/N/BB/CONSORTIUM«SIEMENS-ORASCOM»/2015/No.22 Financial Report

Scope Summary SIEMENS Scope Summary Currency

Contract Price

% of Contract Price

Invoiced

Paid

% of Contract Price

Offshore

EUR

1.054.969.000,00

950.339.284,66

90,1%

937.154.457,93

88,8%

Onshore

EUR

158.031.000,00

111.280.057,18

70,4%

103.802.457,40

65,7%

Total

EUR

1.213.000.000,00

1.061.619.341,84

87,5%

1.040.956.915,33

85,8%

Difference of Invoiced and Paid

Summary

20.662.426,51

July 31, 2017


4800 MW Combined Cycle Power Plant Contract No.: BURULLUS / N / BB / Consortium Siemens-Orascom / 2015 / No. 22 Financial Report

SIEMENS

Activity

Milestone Activity

% to be invoiced

% to be paid

% accumulated

Advance Payment I

7,500%

7,500%

Advance Payment I

7,500%

7,500%

Advance Payment I

7,500%

7,500%

Advance Payment I

7,500%

7,500%

Advance Payment II

7,500%

15,000%

Advance Payment II

7,500%

15,000%

Advance Payment II

7,500%

15,000%

Advance Payment II

7,500%

15,000%

Payment Schedule Milestone

Invoice value to be paid

amount to be paid in EUR

amount in EUR to be paid in EGP

Invoice No.

July 31, 2017

Invoice Date

Payment Date EUR

Payment Date EGP

OFFSHORE Combined Cycle Units

26.374.224,98

26.374.224,98

0,00 771100_C3036_Advanced_OFS

24.08.2015

OFFSHORE Open Cycle Units

52.748.450,03

52.748.450,03

0,00 771100_C3036_Advanced_OFS

24.08.2015

ONSHORE Combined Cycle Units

3.950.775,00

3.298.500,00

652.275,00 7711_C3036_Adv_Ons

24.08.2015

ONSHORE Open Cycle Units

7.901.550,00

6.597.000,00

1.304.550,00 7711_C3036_Adv_Ons

24.08.2015

OFFSHORE Combined Cycle Units

26.374.224,98

26.374.224,98

0,00 771100_C-3036_Advanced2_OFS

31.08.2015

08.09.2015 28.12.2015

OFFSHORE Open Cycle Units

52.748.450,03

52.748.450,03

0,00 771100_C-3036_Advanced2_OFS

31.08.2015

08.09.2015 28.12.2015

3.950.775,00

3.298.500,00

31.08.2015

08.09.2015 28.12.2015

08.09.2015

31.08.2015

08.09.2015 28.12.2015

08.09.2015

ONSHORE Combined Cycle Units ONSHORE Open Cycle Units

7.901.550,00

6.597.000,00

652.275,00 7711_C-3036_Adv2_Ons 1.304.550,00 7711_C-3036_Adv2_Ons

31.08.2015 28.12.2015

31.08.2015 28.12.2015

n.a.

Amount paid in EUR

Amount in EUR paid in EGP

79.122.675,00

-

27.08.2015 9.895.500,00

1.956.825,00

27.08.2015

n.a.

79.122.675,00

9.895.500,00

-

1.956.825,00


4800 MW Combined Cycle Power Plant Contract No.: BURULLUS / N / BB / Consortium Siemens-Orascom / 2015 / No. 22 Financial Report

SIEMENS

July 31, 2017

SIEMENS OFFSHORE - EG1019 Burullus - Milestone Payment Schedule for Open Cycle Units

Activity

Milestone Activity

% to be invoiced

% to be paid % accumulated

Details of advance payment shown on separate overview

Payment Schedule Milestone

Amount to be invoiced

Proportional advance payment value

Invoice value to be paid

amount to be paid in EUR

amount in EUR to Invoice No. be paid in EGP

Invoice Date

Payment Date EUR

Payment Date EGP

Amount paid in Amount paid in EUR EGP

Offshore open Cycle Units

OC-OFF-1

Unit 42 - Placing sub Order for Gas Turbine, Generator

2,353%

2,000%

17,000%

Offshore open Cycle Units

16.548.947,05

2.482.342,06

14.066.604,99

14.066.604,99

-

771100_C-3036-OC-OFF-1

31.03.2016

01.08.2016

14.066.604,99

OC-OFF-2

Unit 41 - Placing sub Order for Gas Turbine, Generator

2,353%

2,000%

19,000%

Offshore open Cycle Units

16.548.947,05

2.482.342,06

14.066.604,99

14.066.604,99

-

771100_C-3036-OC-OFF-2

31.03.2016

01.08.2016

14.066.604,99

OC-OFF-3

Unit 32 - Placing sub Order for Gas Turbine, Generator

2,353%

2,000%

21,000%

Offshore open Cycle Units

16.548.947,05

2.482.342,06

14.066.604,99

14.066.604,99

-

771100_C-3036-OC-OFF-3

31.03.2016

01.08.2016

14.066.604,99

OC-OFF-4

Unit 31 - Placing sub Order for Gas Turbine, Generator

2,353%

2,000%

23,000%

Offshore open Cycle Units

16.548.947,05

2.482.342,06

14.066.604,99

14.066.604,99

-

771100_C-3036-OC-OFF-4

31.03.2016

01.08.2016

14.066.604,99

OC-OFF-5

Unit 22 - Placing sub Order for Gas Turbine, Generator

2,353%

2,000%

25,000%

Offshore open Cycle Units

16.548.947,05

2.482.342,06

14.066.604,99

14.066.604,99

-

771100_C-3036-OC-OFF-5

31.03.2016

01.08.2016

14.066.604,99

OC-OFF-6

Unit 21 - Placing sub Order for Gas Turbine, Generator

2,353%

2,000%

27,000%

Offshore open Cycle Units

16.548.947,05

2.482.342,06

14.066.604,99

14.066.604,99

-

771100_C-3036-OC-OFF-6

31.03.2016

01.08.2016

14.066.604,99

OC-OFF-7

Unit 12 - Placing sub Order for Gas Turbine, Generator

2,353%

2,000%

29,000%

Offshore open Cycle Units

16.548.947,05

2.482.342,06

14.066.604,99

14.066.604,99

-

771100_C-3036-OC-OFF-7

31.03.2016

01.08.2016

14.066.604,99

OC-OFF-8

Unit 11 - Placing sub Order for Gas Turbine, Generator

2,353%

2,000%

31,000%

Offshore open Cycle Units

16.548.947,05

2.482.342,06

14.066.604,99

14.066.604,99

-

771100_C-3036-OC-OFF-8

31.03.2016

01.08.2016

14.066.604,99

OC-OFF-9

Receipt of GT Casing in factory - Unit 42

3,529%

3,000%

34,000%

Offshore open Cycle Units

24.819.904,02

3.722.985,60

21.096.918,42

21.096.918,42

-

771100_C-3036-OC-OFF-9

31.03.2016

01.08.2016

21.096.918,42

OC-OFF-10

Receipt of GT Casing in factory - Unit 41

3,529%

3,000%

37,000%

Offshore open Cycle Units

24.819.904,02

3.722.985,60

21.096.918,42

21.096.918,42

-

771100_C-3036-OC-OFF-10

31.03.2016

01.08.2016

21.096.918,42

OC-OFF-11

Receipt of GT Casing in factory - Unit 32

3,529%

3,000%

40,000%

Offshore open Cycle Units

24.819.904,02

3.722.985,60

21.096.918,42

21.096.918,42

-

771100_C-3036-OC-OFF-11

31.03.2016

01.08.2016

21.096.918,42

OC-OFF-12

Receipt of GT Casing in factory - Unit 31

3,529%

3,000%

43,000%

Offshore open Cycle Units

24.819.904,02

3.722.985,60

21.096.918,42

21.096.918,42

-

771100_C-3036-OC-OFF-12

31.03.2016

01.08.2016

21.096.918,42

OC-OFF-13

Receipt of GT Casing in factory - Unit 22

3,529%

3,000%

46,000%

Offshore open Cycle Units

24.819.904,02

3.722.985,60

21.096.918,42

21.096.918,42

-

771100_C-3036-OC-OFF-13

29.09.2016

30.01.2017

21.096.918,42

OC-OFF-14

Receipt of GT Casing in factory - Unit 21

3,529%

3,000%

49,000%

Offshore open Cycle Units

24.819.904,02

3.722.985,60

21.096.918,42

21.096.918,42

-

771100_C-3036-OC-OFF-14

30.08.2016

29.09.2016

21.096.918,42

OC-OFF-15

Receipt of GT Casing in factory - Unit 12

3,529%

3,000%

52,000%

Offshore open Cycle Units

24.819.904,02

3.722.985,60

21.096.918,42

21.096.918,42

-

771100_C-3036-OC-OFF-15

12.12.2016

30.01.2017

21.096.918,42

OC-OFF-16

Receipt of GT Casing in factory - Unit 11

3,529%

3,000%

55,000%

Offshore open Cycle Units

24.819.904,02

3.722.985,60

21.096.918,42

21.096.918,42

-

771100_C-3036-OC-OFF-16

16.01.2017

27.02.2017

21.096.918,42

OC-OFF-17

FOB Gas Turbine Core Engine - Unit 42

2,500%

2,125%

57,125%

Offshore open Cycle Units

17.582.816,68

2.637.422,50

14.945.394,18

14.945.394,18

-

771100_C-3036-OC-OFF-17

24.05.2016

01.08.2016

14.945.394,18

OC-OFF-18

FOB Gas Turbine Core Engine - Unit 41

2,500%

2,125%

59,250%

Offshore open Cycle Units

17.582.816,68

2.637.422,50

14.945.394,18

14.945.394,18

-

771100_C-3036-OC-OFF-18

24.05.2016

01.08.2016

14.945.394,18

OC-OFF-19

FOB Gas Turbine Core Engine - Unit 32

2,500%

2,125%

61,375%

Offshore open Cycle Units

17.582.816,68

2.637.422,50

14.945.394,18

14.945.394,18

-

771100_C-3036-OC-OFF-19

24.05.2016

01.08.2016

14.945.394,18

OC-OFF-20

FOB Gas Turbine Core Engine - Unit 31

2,500%

2,125%

63,500%

Offshore open Cycle Units

17.582.816,68

2.637.422,50

14.945.394,18

14.945.394,18

-

771100_C-3036-OC-OFF-20

24.05.2016

01.08.2016

14.945.394,18

OC-OFF-21

FOB Gas Turbine Core Engine - Unit 22

2,500%

2,125%

65,625%

Offshore open Cycle Units

17.582.816,68

2.637.422,50

14.945.394,18

14.945.394,18

-

771100_C-3036-OC-OFF-21

20.10.2016

27.02.2017

14.945.394,18

OC-OFF-22

FOB Gas Turbine Core Engine - Unit 21

2,500%

2,125%

67,750%

Offshore open Cycle Units

17.582.816,68

2.637.422,50

14.945.394,18

14.945.394,18

-

771100_C-3036-OC-OFF-22

14.10.2016

27.02.2017

14.945.394,18

OC-OFF-23

FOB Gas Turbine Core Engine - Unit 12

2,500%

2,125%

69,875%

Offshore open Cycle Units

17.582.816,68

2.637.422,50

14.945.394,18

14.945.394,18

-

771100_C-3036-OC-OFF-23

24.01.2017

29.03.2017

14.945.394,18

OC-OFF-24

FOB Gas Turbine Core Engine - Unit 11

2,500%

2,125%

72,000%

Offshore open Cycle Units

17.582.816,68

2.637.422,50

14.945.394,18

14.945.394,18

-

771100_C-3036-OC-OFF-24

27.02.2017

26.07.2017

14.945.394,18

OC-OFF-25

Gas Turbine Core Engine on Site - Unit 42

1,618%

1,375%

73,375%

Offshore open Cycle Units

11.379.598,95

1.706.939,84

9.672.659,11

9.672.659,11

-

771100_C-3036-OC-OFF-25

24.05.2016

01.08.2016

9.672.659,11

OC-OFF-26

Gas Turbine Core Engine on Site - Unit 41

1,618%

1,375%

74,750%

Offshore open Cycle Units

11.379.598,95

1.706.939,84

9.672.659,11

9.672.659,11

-

771100_C-3036-OC-OFF-26

03.07.2016

01.08.2016

9.672.659,11

OC-OFF-27

Gas Turbine Core Engine on Site - Unit 32

1,618%

1,375%

76,125%

Offshore open Cycle Units

11.379.598,95

1.706.939,84

9.672.659,11

9.672.659,11

-

771100_C-3036-OC-OFF-27

03.07.2016

01.08.2016

9.672.659,11

OC-OFF-28

Gas Turbine Core Engine on Site - Unit 31

1,618%

1,375%

77,500%

Offshore open Cycle Units

11.379.598,95

1.706.939,84

9.672.659,11

9.672.659,11

-

771100_C-3036-OC-OFF-28

03.07.2016

01.08.2016

9.672.659,11

OC-OFF-29

Gas Turbine Core Engine onSite - Unit 22

1,618%

1,375%

78,875%

Offshore open Cycle Units

11.379.598,95

1.706.939,84

9.672.659,11

9.672.659,11

-

771100_C-3036-OC-OFF-29

07.11.2016

30.01.2017

9.672.659,11

OC-OFF-30

Gas Turbine Core Engine on Site - Unit 21

1,618%

1,375%

80,250%

Offshore open Cycle Units

11.379.598,95

1.706.939,84

9.672.659,11

9.672.659,11

-

771100_C-3036-OC-OFF-30

31.10.2016

30.01.2017

9.672.659,11

OC-OFF-31

Gas Turbine Core Engine on Site - Unit 12

1,618%

1,375%

81,625%

Offshore open Cycle Units

11.379.598,95

1.706.939,84

9.672.659,11

9.672.659,11

-

771100_C-3036-OC-OFF-31

10.02.2017

29.03.2017

9.672.659,11

OC-OFF-32

Gas Turbine Core Engine on Site - Unit 11

1,618%

1,375%

83,000%

Offshore open Cycle Units

11.379.598,95

1.706.939,84

9.672.659,11

9.672.659,11

-

771100_C-3036-OC-OFF-32

20.03.2017

27.04.2017

9.672.659,11

CCC-OC-OFF-1

First Ignition of Gas Turbine Unit 42

1,250%

1,063%

84,063%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

771100_C-3036-CCC-OC-OFF-1

29.12.2016

27.02.2017

7.472.697,09

CCC-OC-OFF-2

First Ignition of Gas Turbine Unit 41

1,250%

1,063%

85,125%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

771100_C-3036-CCC-OC-OFF-2

22.01.2017

29.03.2017

7.472.697,09

CCC-OC-OFF-3

First Ignition of Gas Turbine Unit 32

1,250%

1,063%

86,188%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

771100_C-3036-CCC-OC-OFF-3

12.01.2017

27.02.2017

7.472.697,09

CCC-OC-OFF-4

First Ignition of Gas Turbine Unit 31

1,250%

1,063%

87,250%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

771100_C-3036-CCC-OC-OFF-4

15.01.2017

27.02.2017

7.472.697,09

CCC-OC-OFF-5

First Ignition of Gas Turbine Unit 22

1,250%

1,063%

88,313%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

771100_C-3036-CCC-OC-OFF-5

30.05.2017

26.07.2017

7.472.697,09

CCC-OC-OFF-6

First Ignition of Gas Turbine Unit 21

1,250%

1,063%

89,375%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

771100_C-3036-CCC-OC-OFF-6

31.05.2017

26.07.2017

7.472.697,09

CCC-OC-OFF-7

First Ignition of Gas Turbine Unit 12 (no advanced OC operation)

1,250%

1,063%

90,438%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

CCC-OC-OFF-8

First Ignition of Gas Turbine Unit 11 (no advanced OC operation)

1,250%

1,063%

91,500%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

TOAC-OC-OFF-1

TOAC of Open Cycle Unit 42

1,250%

1,063%

92,563%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

771100_C-3036-TOAC-OC-OFF-1

22.05.2017

28.06.2017

7.472.697,09

TOAC-OC-OFF-2

TOAC of Open Cycle Unit 41

1,250%

1,063%

93,625%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

771100_C-3036-TOAC-OC-OFF-2

20.05.2017

28.06.2017

7.472.697,09

TOAC-OC-OFF-3

TOAC of Open Cycle Unit 32

1,250%

1,063%

94,688%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

771100_C-3036-TOAC-OC-OFF-3

02.05.2017

28.06.2017

7.472.697,09

TOAC-OC-OFF-4

TOAC of Open Cycle Unit 31

1,250%

1,063%

95,750%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

771100_C-3036-TOAC-OC-OFF-4

22.05.2017

28.06.2017

7.472.697,09

TOAC-OC-OFF-5

TOAC of Open Cycle Unit 22

1,250%

1,063%

96,813%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

TOAC-OC-OFF-6

TOAC of Open Cycle Unit 21

1,250%

1,063%

97,875%

Offshore open Cycle Units

8.791.408,34

1.318.711,25

7.472.697,09

7.472.697,09

-

TOAC-OC-OFF-7+8

TOAC of Unit 12+11 = ToAC of Combined Cycle Module 1

2,500%

2,125%

100,000%

Offshore open Cycle Units

17.582.816,68

2.637.422,50

14.945.394,18

14.945.394,18

-


4800 MW Combined Cycle Power Plant Contract No.: BURULLUS / N / BB / Consortium Siemens-Orascom / 2015 / No. 22 Financial Report

SIEMENS

July 31, 2017

SIEMENS ONSHORE - EG1019 Burullus - Milestone Payment Schedule for Open Cycle Units

Activity

Milestone Activity

% to be invoiced

% to be paid % accumulated Payment Schedule Milestone

Details of advance payment shown on separate overview

Invoice value to amount to be be paid paid in EUR

amount in EUR to Invoice No. be paid in EGP

Invoice Date

Payment Date Payment Date Amount paid in Amount paid in EUR EGP EUR EGP

Onshore open Cycle Units

OC-ON-1

Placing Gas Turbine Core Engine - Unit 42

3,529%

3,000%

18,000%

Onshore open Cycle Units

3.160.251,26

2.638.492,14

521.759,12 7711BS_C3036_OC-ON-1

03.07.2016

01.08.2016

29.07.2016

2.638.492,14

521.759,12

OC-ON-2

Placing Gas Turbine Core Engine - Unit 41

3,529%

3,000%

21,000%

Onshore open Cycle Units

3.160.251,26

2.638.492,14

521.759,12 7711BS_C3036_OC-ON-2

03.07.2016

01.08.2016

29.07.2016

2.638.492,14

521.759,12

OC-ON-3

Placing Gas Turbine Core Engine - Unit 32

3,529%

3,000%

24,000%

Onshore open Cycle Units

3.160.251,26

2.638.492,14

521.759,12 7711BS_C3036_OC-ON-3

28.07.2016

29.09.2016

29.09.2016

2.638.492,14

521.759,12

OC-ON-4

Placing Gas Turbine Core Engine - Unit 31

3,529%

3,000%

27,000%

Onshore open Cycle Units

3.160.251,26

2.638.492,14

521.759,12 7711BS_C3036_OC-ON-4

28.07.2016

29.09.2016

29.09.2016

2.638.492,14

521.759,12

OC-ON-5

Placing Gas Turbine Core Engine - Unit 22

3,529%

3,000%

30,000%

Onshore open Cycle Units

3.160.251,26

2.638.492,14

521.759,12 7711BS_C3036_OC-ON-5

22.11.2016

30.01.2017

30.01.2017

2.638.492,14

521.759,12

OC-ON-6

Placing Gas Turbine Core Engine - Unit 21

3,529%

3,000%

33,000%

Onshore open Cycle Units

3.160.251,26

2.638.492,14

521.759,12 7711BS_C3036_OC-ON-6

27.11.2016

30.01.2017

30.01.2017

2.638.492,14

521.759,12

OC-ON-7

Placing Gas Turbine Core Engine - Unit 12

3,529%

3,000%

36,000%

Onshore open Cycle Units

3.160.251,26

2.638.492,14

521.759,12 7711BS_C3036_OC-ON-7

30.03.2017

30.05.2017

OC-ON-8

Placing Gas Turbine Core Engine - Unit 11

3,529%

3,000%

39,000%

Onshore open Cycle Units

3.160.251,26

2.638.492,14

521.759,12 7711BS_C3036_OC-ON-8

14.04.2017

30.05.2017

OC-ON-9

Start Lube Oil Flushing GT - Unit 42

2,353%

2,000%

41,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70 7711BS_C3036_OC-ON-9

16.11.2016

30.01.2017

30.01.2017

1.759.243,98

347.888,70

OC-ON-10

Start Lube Oil Flushing GT - Unit 41

2,353%

2,000%

43,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70 7711BS_C3036_OC-ON-10

16.11.2016

30.01.2017

30.01.2017

1.759.243,98

347.888,70

OC-ON-11

Start Lube Oil Flushing GT - Unit 32

2,353%

2,000%

45,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70 7711BS_C3036_OC-ON-11

21.11.2016

30.01.2017

30.01.2017

1.759.243,98

347.888,70

OC-ON-12

Start Lube Oil Flushing GT - Unit 31

2,353%

2,000%

47,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70 7711BS_C3036_OC-ON-12

21.11.2016

30.01.2017

30.01.2017

1.759.243,98

347.888,70

OC-ON-13

Start Lube Oil Flushing GT - Unit 22

2,353%

2,000%

49,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70 7711BS_C3036_OC-ON-13

13.04.2017

28.06.2017

1.759.243,98

OC-ON-14

Start Lube Oil Flushing GT - Unit 21

2,353%

2,000%

51,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70 7711BS_C3036_OC-ON-14

16.04.2017

28.06.2017

1.759.243,98

OC-ON-15

Start Lube Oil Flushing GT - Unit 12

2,353%

2,000%

53,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70

OC-ON-16

Start Lube Oil Flushing GT - Unit 11

2,353%

2,000%

55,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70

OC-ON-17

Start Cold Commissioning GT - Unit 42

2,353%

2,000%

57,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70 7711BS_C3036_OC-ON-17

24.11.2016

30.01.2017

30.01.2017

1.759.243,98

347.888,70

OC-ON-18

Start Cold Commissioning GT - Unit 41

2,353%

2,000%

59,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70 7711BS_C3036_OC-ON-18

24.11.2016

30.01.2017

30.01.2017

1.759.243,98

347.888,70

OC-ON-19

Start Cold Commissioning GT - Unit 32

2,353%

2,000%

61,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70 7711BS_C3036_OC-ON-19

14.12.2016

30.01.2017

30.01.2017

1.759.243,98

347.888,70

OC-ON-20

Start Cold Commissioning GT - Unit 31

2,353%

2,000%

63,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70 7711BS_C3036_OC-ON-20

18.12.2016

30.01.2017

30.01.2017

1.759.243,98

347.888,70

OC-ON-21

Start Cold Commissioning GT - Unit 22

2,353%

2,000%

65,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70 7711BS_C3036_OC-ON-21

23.04.2017

28.06.2017

1.759.243,98

OC-ON-22

Start Cold Commissioning GT - Unit 21

2,353%

2,000%

67,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70 7711BS_C3036_OC-ON-22

30.04.2017

28.06.2017

1.759.243,98

OC-ON-23

Start Cold Commissioning GT - Unit 12

2,353%

2,000%

69,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70

OC-ON-24

Start Cold Commissioning GT - Unit 11

2,353%

2,000%

71,000%

Onshore open Cycle Units

2.107.132,68

1.759.243,98

347.888,70

OC-ON-25

Start Hot Commissioning GT - Unit 42

1,765%

1,500%

72,500%

Onshore open Cycle Units

1.580.573,38

1.319.619,90

260.953,48 7711BS_C3036_OC-ON-25

26.12.2016

27.02.2017

30.03.2017

1.319.619,90

260.953,48

OC-ON-26

Start Hot Commissioning GT - Unit 41

1,765%

1,500%

74,000%

Onshore open Cycle Units

1.580.573,38

1.319.619,90

260.953,48 7711BS_C3036_OC-ON-26

21.01.2017

29.03.2017

10.05.2017

1.319.619,90

260.953,48

OC-ON-27

Start Hot Commissioning GT - Unit 32

1,765%

1,500%

75,500%

Onshore open Cycle Units

1.580.573,38

1.319.619,90

260.953,48 7711BS_C3036_OC-ON-27

10.01.2017

27.02.2017

30.03.2017

1.319.619,90

260.953,48

OC-ON-28

Start Hot Commissioning GT - Unit 31

1,765%

1,500%

77,000%

Onshore open Cycle Units

1.580.573,38

1.319.619,90

260.953,48 7711BS_C3036_OC-ON-28

13.01.2017

27.02.2017

30.03.2017

1.319.619,90

260.953,48

OC-ON-29

Start Hot Commissioning GT - Unit 22

1,765%

1,500%

78,500%

Onshore open Cycle Units

1.580.573,38

1.319.619,90

260.953,48 7711BS_C3036_OC-ON-29

30.05.2017

26.07.2017

1.319.619,90

OC-ON-30

Start Hot Commissioning GT - Unit 21

1,765%

1,500%

80,000%

Onshore open Cycle Units

1.580.573,38

1.319.619,90

260.953,48 7711BS_C3036_OC-ON-30

31.05.2017

26.07.2017

1.319.619,90

OC-ON-31

Start Hot Commissioning GT - Unit 12

1,765%

1,500%

81,500%

Onshore open Cycle Units

1.580.573,38

1.319.619,90

260.953,48

OC-ON-32

Start Hot Commissioning GT - Unit 11

1,765%

1,500%

83,000%

Onshore open Cycle Units

1.580.573,38

1.319.619,90

260.953,48

CCC-OC-ON-1

First Ignition of Gas Turbine Unit 42

1,250%

1,063%

84,063%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25 7711BS_C3036_CCC-OC-ON-1

29.12.2016

27.02.2017

30.03.2017

934.575,00

184.811,25

CCC-OC-ON-2

First Ignition of Gas Turbine Unit 41

1,250%

1,063%

85,125%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25 7711BS_C3036_CCC-OC-ON-2

22.01.2017

29.03.2017

10.05.2017

934.575,00

184.811,25

CCC-OC-ON-3

First Ignition of Gas Turbine Unit 32

1,250%

1,063%

86,188%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25 7711BS_C3036_CCC-OC-ON-3

12.01.2017

27.02.2017

30.03.2017

934.575,00

184.811,25

CCC-OC-ON-4

First Ignition of Gas Turbine Unit 31

1,250%

1,063%

87,250%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25 7711BS_C3036_CCC-OC-ON-4

15.01.2017

27.02.2017

30.03.2017

934.575,00

184.811,25

CCC-OC-ON-5

First Ignition of Gas Turbine Unit 22

1,250%

1,063%

88,313%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25 7711BS_C3036_CCC-OC-ON-5

30.05.2017

26.07.2017

934.575,00

CCC-OC-ON-6

First Ignition of Gas Turbine Unit 21

1,250%

1,063%

89,375%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25 7711BS_C3036_CCC-OC-ON-6

31.05.2017

26.07.2017

934.575,00

CCC-OC-ON-7

First Ignition of Gas Turbine Unit 12 (no advanced OC operation)

1,250%

1,063%

90,438%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25

CCC-OC-ON-8

First Ignition of Gas Turbine Unit 11 (no advanced OC operation)

1,250%

1,063%

91,500%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25

TOAC-OC-ON-1

TOAC of Open Cycle Unit 42

1,250%

1,063%

92,563%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25 7711BS_C3036_TOAC-OC-ON-1

22.05.2017

28.06.2017

934.575,00

TOAC-OC-ON-2

TOAC of Open Cycle Unit 41

1,250%

1,063%

93,625%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25 7711BS_C3036_TOAC-OC-ON-2

20.05.2017

28.06.2017

934.575,00

TOAC-OC-ON-3

TOAC of Open Cycle Unit 32

1,250%

1,063%

94,688%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25 7711BS_C3036_TOAC-OC-ON-3

02.05.2017

28.06.2017

934.575,00

TOAC-OC-ON-4

TOAC of Open Cycle Unit 31

1,250%

1,063%

95,750%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25 7711BS_C3036_TOAC-OC-ON-4

22.05.2017

28.06.2017

934.575,00

TOAC-OC-ON-5

TOAC of Open Cycle Unit 22

1,250%

1,063%

96,813%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25

TOAC-OC-ON-6

TOAC of Open Cycle Unit 21

1,250%

1,063%

97,875%

Onshore open Cycle Units

1.119.386,25

934.575,00

184.811,25

2,500%

2,125%

100,000%

Onshore open Cycle Units

2.238.772,50

1.869.150,00

369.622,50

TOAC-OC-ON-7+8 TOAC of Unit 12+11 = ToAC of Combined Cycle Module 10

2.638.492,14 2.638.492,14


4800 MW Combined Cycle Power Plant Contract No.: BURULLUS / N / BB / Consortium Siemens-Orascom / 2015 / No. 22 Financial Report

SIEMENS

July 31, 2017

SIEMENS OFFSHORE - EG1019 Burullus - Milestone Payment Schedule for Combined Cycle Units

Activity

Milestone Activity

% to be invoiced

% to be paid

% accumulated

Details of advance payment shown on separate overview

Payment Schedule Milestone

Invoice value to be paid

amount to be paid in EUR

amount in EUR to be paid in EGP

Invoice No.

Invoice Date

Payment Date EUR

Payment Date EGP

Amount paid in EUR

Offshore combined Cycle Units

CC-OFF-1

Placing Sub Order Steam turbine - Unit 10

2,353%

2,000%

17,000%

Offshore combined Cycle Units

7.033.302,49

7.033.302,49

-

771100_C-3036-CC-OFF-1

31.03.2016

01.08.2016

7.033.302,49

CC-OFF-2

Placing Sub Order Steam turbine - Unit 20

2,353%

2,000%

19,000%

Offshore combined Cycle Units

7.033.302,49

7.033.302,49

-

771100_C-3036-CC-OFF-2

31.03.2016

01.08.2016

7.033.302,49

CC-OFF-3

Placing Sub Order Steam turbine - Unit 30

2,353%

2,000%

21,000%

Offshore combined Cycle Units

7.033.302,49

7.033.302,49

-

771100_C-3036-CC-OFF-3

31.03.2016

01.08.2016

7.033.302,49

CC-OFF-4

Placing Sub Order Steam turbine - Unit 40

2,353%

2,000%

23,000%

Offshore combined Cycle Units

7.033.302,49

7.033.302,49

-

771100_C-3036-CC-OFF-4

31.03.2016

01.08.2016

7.033.302,49

CC-OFF-5

Placing Sub Order HRSG Unit 11 & Unit 12

2,353%

2,000%

25,000%

Offshore combined Cycle Units

7.033.302,49

7.033.302,49

-

771100_C-3036-CC-OFF-5

31.03.2016

01.08.2016

7.033.302,49

CC-OFF-6

Placing Sub Order HRSG Unit 21 & Unit 22

2,353%

2,000%

27,000%

Offshore combined Cycle Units

7.033.302,49

7.033.302,49

-

771100_C-3036-CC-OFF-6

31.03.2016

01.08.2016

7.033.302,49

CC-OFF-7

Placing Sub Order HRSG Unit 31 & Unit 32

2,353%

2,000%

29,000%

Offshore combined Cycle Units

7.033.302,49

7.033.302,49

-

771100_C-3036-CC-OFF-7

31.03.2016

01.08.2016

7.033.302,49

CC-OFF-8

Placing Sub Order HRSG Unit 41 & Unit 42

2,353%

2,000%

31,000%

Offshore combined Cycle Units

7.033.302,49

7.033.302,49

-

771100_C-3036-CC-OFF-8

31.03.2016

01.08.2016

7.033.302,49

CC-OFF-9

Receipt of ST Generator Casing in factory - Unit 10

3,529%

3,000%

34,000%

Offshore combined Cycle Units

10.548.459,19

10.548.459,19

-

771100_C-3036-CC-OFF-9

29.09.2016

30.01.2017

10.548.459,19

CC-OFF-10

Receipt of ST Forging & Casing in factory - Unit 10

3,529%

3,000%

37,000%

Offshore combined Cycle Units

10.548.459,19

10.548.459,19

-

771100_C-3036-CC-OFF-10

24.05.2016

01.08.2016

10.548.459,19

CC-OFF-11

Receipt of ST Generator Casing in factory - Unit 20

3,529%

3,000%

40,000%

Offshore combined Cycle Units

10.548.459,19

10.548.459,19

-

771100_C-3036-CC-OFF-11

30.08.2016

29.09.2016

10.548.459,19

CC-OFF-12

Receipt of ST Forging & Casing in factory - Unit 20

3,529%

3,000%

43,000%

Offshore combined Cycle Units

10.548.459,19

10.548.459,19

-

771100_C-3036-CC-OFF-12

28.07.2016

29.09.2016

10.548.459,19

CC-OFF-13

Receipt of ST Generator Casing in factory - Unit 30

3,529%

3,000%

46,000%

Offshore combined Cycle Units

10.548.459,19

10.548.459,19

-

771100_C-3036-CC-OFF-13

01.12.2016

30.01.2017

10.548.459,19

CC-OFF-14

Receipt of ST Forging & Casing in factory - Unit 30

3,529%

3,000%

49,000%

Offshore combined Cycle Units

10.548.459,19

10.548.459,19

-

771100_C-3036-CC-OFF-14

30.08.2016

29.09.2016

10.548.459,19

CC-OFF-15

Receipt of ST Generator Casing in factory - Unit 40

3,529%

3,000%

52,000%

Offshore combined Cycle Units

10.548.459,19

10.548.459,19

-

771100_C-3036-CC-OFF-15

13.01.2017

27.02.2017

10.548.459,19

CC-OFF-16

Receipt of ST Forging & Casing in factory - Unit 40

3,529%

3,000%

55,000%

Offshore combined Cycle Units

10.548.459,19

10.548.459,19

-

771100_C-3036-CC-OFF-16

16.11.2016

30.01.2017

10.548.459,19

CC-OFF-17

FOB Shipment of HRSG Modules - Unit 11

1,324%

1,125%

56,125%

Offshore combined Cycle Units

3.957.540,37

3.957.540,37

-

771100_C-3036-CC-OFF-17

29.09.2016

30.01.2017

3.957.540,37

CC-OFF-18

FOB Shipment of HRSG Modules - Unit 12

1,324%

1,125%

57,250%

Offshore combined Cycle Units

3.957.540,37

3.957.540,37

-

771100_C-3036-CC-OFF-18

01.11.2016

30.01.2017

3.957.540,37

CC-OFF-19

FOB Shipment of HRSG Modules - Unit 21

1,324%

1,125%

58,375%

Offshore combined Cycle Units

3.957.540,37

3.957.540,37

-

771100_C-3036-CC-OFF-19

04.10.2016

30.01.2017

3.957.540,37

CC-OFF-20

FOB Shipment of HRSG Modules - Unit 22

1,324%

1,125%

59,500%

Offshore combined Cycle Units

3.957.540,37

3.957.540,37

-

771100_C-3036-CC-OFF-20

08.12.2016

30.01.2017

3.957.540,37

CC-OFF-21

FOB Shipment of HRSG Modules - Unit 31

1,324%

1,125%

60,625%

Offshore combined Cycle Units

3.957.540,37

3.957.540,37

-

771100_C-3036-CC-OFF-21

04.01.2017

27.02.2017

3.957.540,37

CC-OFF-22

FOB Shipment of HRSG Modules - Unit 32

1,324%

1,125%

61,750%

Offshore combined Cycle Units

3.957.540,37

3.957.540,37

-

771100_C-3036-CC-OFF-22

23.01.2017

27.04.2017

3.957.540,37

CC-OFF-23

FOB Shipment of HRSG Modules - Unit 41

1,324%

1,125%

62,875%

Offshore combined Cycle Units

3.957.540,37

3.957.540,37

-

771100_C-3036-CC-OFF-23

04.03.2017

30.05.2017

3.957.540,37

CC-OFF-24

FOB Shipment of HRSG Modules - Unit 42

1,324%

1,125%

64,000%

Offshore combined Cycle Units

3.957.540,37

3.957.540,37

-

771100_C-3036-CC-OFF-24

31.03.2017

28.06.2017

3.957.540,37

CC-OFF-25

FOB Shipment Steam Turbine Core Engine (HP,IP,LP) - Unit 10

1,176%

1,000%

65,000%

Offshore combined Cycle Units

3.515.156,71

3.515.156,71

-

771100_C-3036-CC-OFF-25

06.01.2017

28.06.2017

3.515.156,71

CC-OFF-26

FOB Shipment Steam Turbine Core Engine (HP,IP,LP) - Unit 20

1,176%

1,000%

66,000%

Offshore combined Cycle Units

3.515.156,71

3.515.156,71

-

771100_C-3036-CC-OFF-26

13.02.2017

28.06.2017

3.515.156,71

CC-OFF-27

FOB Shipment Steam Turbine Core Engine (HP,IP,LP) - Unit 30

1,176%

1,000%

67,000%

Offshore combined Cycle Units

3.515.156,71

3.515.156,71

-

771100_C-3036-CC-OFF-27

20.04.2017

28.06.2017

3.515.156,71

CC-OFF-28

FOB Shipment Steam Turbine Core Engine (HP,IP,LP) - Unit 40

1,176%

1,000%

68,000%

Offshore combined Cycle Units

3.515.156,71

3.515.156,71

-

771100_C-3036-CC-OFF-28

26.05.2017

CC-OFF-29

Receipt on Site of HRSG Modules - Unit 11

1,176%

1,000%

69,000%

Offshore combined Cycle Units

3.515.156,71

3.515.156,71

-

771100_C-3036-CC-OFF-29

19.11.2016

30.01.2017

3.515.156,71

CC-OFF-30

Receipt on Site of HRSG Modules - Unit 12

1,176%

1,000%

70,000%

Offshore combined Cycle Units

3.515.156,71

3.515.156,71

-

771100_C-3036-CC-OFF-30

21.12.2016

30.01.2017

3.515.156,71

CC-OFF-31

Receipt on Site of HRSG Modules - Unit 21

1,176%

1,000%

71,000%

Offshore combined Cycle Units

3.515.156,71

3.515.156,71

-

771100_C-3036-CC-OFF-31

12.12.2016

30.01.2017

3.515.156,71

CC-OFF-32

Receipt on Site of HRSG Modules - Unit 22

1,176%

1,000%

72,000%

Offshore combined Cycle Units

3.515.156,71

3.515.156,71

-

771100_C-3036-CC-OFF-32

13.02.2017

29.03.2017

3.515.156,71

CC-OFF-33

Receipt on Site of HRSG Modules - Unit 31

1,176%

1,000%

73,000%

Offshore combined Cycle Units

3.515.156,71

3.515.156,71

-

771100_C-3036-CC-OFF-33

18.03.2017

27.04.2017

3.515.156,71

CC-OFF-34

Receipt on Site of HRSG Modules - Unit 32

1,176%

1,000%

74,000%

Offshore combined Cycle Units

3.515.156,71

3.515.156,71

-

771100_C-3036-CC-OFF-34

22.03.2017

27.04.2017

3.515.156,71

CC-OFF-35

Receipt on Site of HRSG Modules - Unit 41

1,176%

1,000%

75,000%

Offshore combined Cycle Units

3.515.156,71

3.515.156,71

-

771100_C-3036-CC-OFF-35

08.05.2017

28.06.2017

3.515.156,71

CC-OFF-36

Receipt on Site of HRSG Modules - Unit 42

1,176%

1,000%

76,000%

Offshore combined Cycle Units

3.515.156,71

3.515.156,71

-

771100_C-3036-CC-OFF-36

18.05.2017

CC-OFF-37

Receipt on Site Steam Turbine Core Engine (HP,IP,LP) - Unit 10

2,059%

1,750%

77,750%

Offshore combined Cycle Units

6.154.513,31

6.154.513,31

-

771100_C-3036-CC-OFF-37

28.02.2017

29.03.2017

6.154.513,31

CC-OFF-38

Receipt on Site Steam Turbine Core Engine (HP,IP,LP) - Unit 20

2,059%

1,750%

79,500%

Offshore combined Cycle Units

6.154.513,31

6.154.513,31

-

771100_C-3036-CC-OFF-38

04.03.2017

27.04.2017

6.154.513,31

CC-OFF-39

Receipt on Site Steam Turbine Core Engine (HP,IP,LP) - Unit 30

2,059%

1,750%

81,250%

Offshore combined Cycle Units

6.154.513,31

6.154.513,31

-

771100_C-3036-CC-OFF-39

05.05.2017

28.06.2017

6.154.513,31

CC-OFF-40

Receipt on Site Steam Turbine Core Engine (HP,IP,LP) - Unit 40

2,059%

1,750%

83,000%

Offshore combined Cycle Units

6.154.513,31

6.154.513,31

-

771100_C-3036-CC-OFF-40

17.06.2017

CCC-CC-1

Steam Blow of Combined Module 10

2,500%

2,125%

85,125%

Offshore combined Cycle Units

7.472.697,08

7.472.697,08

-

CCC-CC-2

Steam Blow of Combined Module 20

2,500%

2,125%

87,250%

Offshore combined Cycle Units

7.472.697,08

7.472.697,08

-

CCC-CC-3

Steam Blow of Combined Module 30

2,500%

2,125%

89,375%

Offshore combined Cycle Units

7.472.697,08

7.472.697,08

-

CCC-CC-4

Steam Blow of Combined Module 40

2,500%

2,125%

91,500%

Offshore combined Cycle Units

7.472.697,08

7.472.697,08

-

TOAC-CC-1

TOAC of Combined Cycle Unit/Module 10

2,500%

2,125%

93,625%

Offshore combined Cycle Units

7.472.697,08

7.472.697,08

-

TOAC-CC-2

TOAC of Combined Cycle Unit 20

2,500%

2,125%

95,750%

Offshore combined Cycle Units

7.472.697,08

7.472.697,08

-

TOAC-CC-3

TOAC of Combined Cycle Unit 30

2,500%

2,125%

97,875%

Offshore combined Cycle Units

7.472.697,08

7.472.697,08

-

TOAC-CC-4

TOAC of Combined Cycle Unit 40

2,500%

2,125%

100,000%

Offshore combined Cycle Units

7.484.653,33

7.484.653,33

-

Amount paid in EGP


4800 MW Combined Cycle Power Plant Contract No.: BURULLUS / N / BB / Consortium Siemens-Orascom / 2015 / No. 22 Financial Report

SIEMENS

July 31, 2017

SIEMENS ONSHORE - EG1019 Burullus - Milestone Payment Schedule for Combined Cycle Units

Activity

Milestone Activity

% to be invoiced

% to be paid % accumulated

Details of advance payment shown on separate overview

Payment Schedule Milestone

Invoice value to be paid

amount to be paid in EUR

amount in EUR to Invoice No. be paid in EGP

Invoice Date

Payment Date EUR

Payment Date EGP

Amount paid in Amount paid in EUR EGP

Onshore combined Cycle Units

CC-ON-1

Receipt on Site of HRSG Modules - Unit 11

2,353%

2,000%

17,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35 771100_C-3036-CC-ON-1

19.11.2016

30.01.2017

30.01.2017

879.621,99

173.944,35

CC-ON-2

Receipt on Site of HRSG Modules - Unit 12

2,353%

2,000%

19,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35 771100_C-3036-CC-ON-2

21.12.2016

30.01.2017

30.01.2017

879.621,99

173.944,35

CC-ON-3

Receipt on Site of HRSG Modules - Unit 21

2,353%

2,000%

21,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35 771100_C-3036-CC-ON-3

12.12.2016

30.01.2017

30.01.2017

879.621,99

173.944,35

CC-ON-4

Receipt on Site of HRSG Modules - Unit 22

2,353%

2,000%

23,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35 771100_C-3036-CC-ON-4

13.02.2017

29.03.2017

10.05.2017

879.621,99

173.944,35

CC-ON-5

Receipt on Site of HRSG Modules - Unit 31

2,353%

2,000%

25,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35 771100_C-3036-CC-ON-5

18.03.2017

27.04.2017

10.05.2017

879.621,99

173.944,35

CC-ON-6

Receipt on Site of HRSG Modules - Unit 32

2,353%

2,000%

27,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35 771100_C-3036-CC-ON-6

22.03.2017

27.04.2017

10.05.2017

879.621,99

173.944,35

CC-ON-7

Receipt on Site of HRSG Modules - Unit 41

2,353%

2,000%

29,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35 771100_C-3036-CC-ON-7

08.05.2017

28.06.2017

879.621,99

CC-ON-8

Receipt on Site of HRSG Modules - Unit 42

2,353%

2,000%

31,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35 771100_C-3036-CC-ON-8

18.05.2017

CC-ON-9

Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 10

2,353%

2,000%

33,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35

CC-ON-10

Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 20

2,353%

2,000%

35,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35

CC-ON-11

Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 30

2,353%

2,000%

37,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35

CC-ON-12

Placing Steam Turbine Core Engine (HP,IP,LP) - Unit 40

2,353%

2,000%

39,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35

CC-ON-13

Finalisation of erection HRSG Modules - Unit 11

2,353%

2,000%

41,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35 771100_C-3036-CC-ON-13

27.04.2017

28.06.2017

879.621,99

CC-ON-14

Finalisation of erection HRSG Modules - Unit 12

2,353%

2,000%

43,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35 771100_C-3036-CC-ON-14

15.05.2017

28.06.2017

879.621,99

CC-ON-15

Finalisation of erection HRSG Modules - Unit 21

2,353%

2,000%

45,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35 771100_C-3036-CC-ON-15

04.05.2017

28.06.2017

879.621,99

CC-ON-16

Finalisation of erection HRSG Modules - Unit 22

2,353%

2,000%

47,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35 771100_C-3036-CC-ON-16

04.07.2017

CC-ON-17

Finalisation of erection HRSG Modules - Unit 31

2,353%

2,000%

49,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35

CC-ON-18

Finalisation of erection HRSG Modules - Unit 32

2,353%

2,000%

51,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35

CC-ON-19

Finalisation of erection HRSG Modules - Unit 41

2,353%

2,000%

53,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35

CC-ON-20

Finalisation of erection HRSG Modules - Unit 42

2,353%

2,000%

55,000%

Onshore combined Cycle Units

1.053.566,34

879.621,99

173.944,35

CC-ON-21

Finalisation of Erection Steam Turbine Bearing Casings - Unit 10

2,059%

1,750%

56,750%

Onshore combined Cycle Units

921.926,52

769.715,97

152.210,55 771100_C-3036-CC-ON-21

23.04.2017

28.06.2017

769.715,97

CC-ON-22

Finalisation of Erection Steam Turbine Bearing Casings - Unit 20

2,059%

1,750%

58,500%

Onshore combined Cycle Units

921.926,52

769.715,97

152.210,55 771100_C-3036-CC-ON-22

30.04.2017

28.06.2017

769.715,97

CC-ON-23

Finalisation of Erection Steam Turbine Bearing Casings - Unit 30

2,059%

1,750%

60,250%

Onshore combined Cycle Units

921.926,52

769.715,97

152.210,55 771100_C-3036-CC-ON-23

06.05.2017

28.06.2017

769.715,97

CC-ON-24

Finalisation of Erection Steam Turbine Bearing Casings - Unit 40

2,059%

1,750%

62,000%

Onshore combined Cycle Units

921.926,52

769.715,97

152.210,55 771100_C-3036-CC-ON-24

19.05.2017

28.06.2017

769.715,97

CC-ON-25

Finalisation Erection N-Turbine Outer Casing - ST Unit 10

1,765%

1,500%

63,500%

Onshore combined Cycle Units

790.286,69

659.809,95

130.476,74

CC-ON-26

Finalisation Erection N-Turbine Outer Casing - ST Unit 20

1,765%

1,500%

65,000%

Onshore combined Cycle Units

790.286,69

659.809,95

130.476,74

CC-ON-27

Finalisation Erection N-Turbine Outer Casing - ST Unit 30

1,765%

1,500%

66,500%

Onshore combined Cycle Units

790.286,69

659.809,95

130.476,74

CC-ON-28

Finalisation Erection N-Turbine Outer Casing - ST Unit 40

1,765%

1,500%

68,000%

Onshore combined Cycle Units

790.286,69

659.809,95

130.476,74

CC-ON-29

Start Oil Flushing ST - Unit 10

1,176%

1,000%

69,000%

Onshore combined Cycle Units

526.559,29

439.624,08

86.935,21

CC-ON-30

Start Oil Flushing ST - Unit 20

1,176%

1,000%

70,000%

Onshore combined Cycle Units

526.559,29

439.624,08

86.935,21

CC-ON-31

Start Oil Flushing ST - Unit 30

1,176%

1,000%

71,000%

Onshore combined Cycle Units

526.559,29

439.624,08

86.935,21

CC-ON-32

Start Oil Flushing ST - Unit 40

1,176%

1,000%

72,000%

Onshore combined Cycle Units

526.559,29

439.624,08

86.935,21

CC-ON-33

Start Cold Commissioning ST - Unit 10

1,176%

1,000%

73,000%

Onshore combined Cycle Units

526.559,29

439.624,08

86.935,21

CC-ON-34

Start Cold Commissioning ST - Unit 20

1,176%

1,000%

74,000%

Onshore combined Cycle Units

526.559,29

439.624,08

86.935,21

CC-ON-35

Start Cold Commissioning ST - Unit 30

1,176%

1,000%

75,000%

Onshore combined Cycle Units

526.559,29

439.624,08

86.935,21

CC-ON-36

Start Cold Commissioning ST - Unit 40

1,176%

1,000%

76,000%

Onshore combined Cycle Units

526.559,29

439.624,08

86.935,21

CC-ON-37

First Turning Gear Steam Turbine - Unit 10

2,059%

1,750%

77,750%

Onshore combined Cycle Units

921.926,52

769.715,97

152.210,55

CC-ON-38

First Turning Gear Steam Turbine - Unit 20

2,059%

1,750%

79,500%

Onshore combined Cycle Units

921.926,52

769.715,97

152.210,55

CC-ON-39

First Turning Gear Steam Turbine - Unit 30

2,059%

1,750%

81,250%

Onshore combined Cycle Units

921.926,52

769.715,97

152.210,55

CC-ON-40

First Turning Gear Steam Turbine - Unit 40

2,059%

1,750%

83,000%

Onshore combined Cycle Units

921.926,52

769.715,97

152.210,55

CCC-CC-1

Steam Blow of Combined Module 10

2,500%

2,125%

85,125%

Onshore combined Cycle Units

1.119.386,25

934.575,00

184.811,25

CCC-CC-2

Steam Blow of Combined Module 20

2,500%

2,125%

87,250%

Onshore combined Cycle Units

1.119.386,25

934.575,00

184.811,25

CCC-CC-3

Steam Blow of Combined Module 30

2,500%

2,125%

89,375%

Onshore combined Cycle Units

1.119.386,25

934.575,00

184.811,25

CCC-CC-4

Steam Blow of Combined Module 40

2,500%

2,125%

91,500%

Onshore combined Cycle Units

1.119.386,25

934.575,00

184.811,25

TOAC-CC-1

TOAC of Combined Cycle Unit/Module 10

2,500%

2,125%

93,625%

Onshore combined Cycle Units

1.119.386,25

934.575,00

184.811,25

TOAC-CC-2

TOAC of Combined Cycle Unit 20

2,500%

2,125%

95,750%

Onshore combined Cycle Units

1.119.386,25

934.575,00

184.811,25

TOAC-CC-3

TOAC of Combined Cycle Unit 30

2,500%

2,125%

97,875%

Onshore combined Cycle Units

1.119.386,25

934.575,00

184.811,25

TOAC-CC-4

TOAC of Combined Cycle Unit 40

2,500%

2,125%

100,000%

Onshore combined Cycle Units

1.119.386,25

934.575,00

184.811,25


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

A 6.

Intern Siemens

Shipments Status

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Project:

Burullus

Shipment No. Mode of transportPackage quantity 3549 Sea 0 6128 Sea 2 5113 Air 2 9004 Truck 6 3571 Air 9 2940 Air 6 4918 Sea 2 5299 Sea 2

Gr. Wt. 0,00 8443,37 136,00 1920,00 1473,09 687,00 6600,00 51120,00

Schmidt, Thomas , Phone: +49 (69) 807-2253 , Mobile: +49 (173) 5153412 , Email: thomas.schmidt@siemens.com

Volume 0 7 0 13 3 3 43 123

5257 Sea

5

67680,00

482

5258 Sea

1

11770,00

96

5253 Sea

3

41983,00

289

5298 Sea

7

4701,68

29

5318 Sea

16

7714,00

28

5301 Sea

1

3822,07

4

5297 Sea

2

3758,00

9

5305 Sea

5

867,00

7

5200 Sea

15

18551,92

98

3604 Sea

1

35,65

0

2964 Sea

4

493,00

4

5313 Sea

12

19923,00

72

6112 Air 5330 Sea

1 2

431,00 26700,00

4 154

3613 Sea

7

5666,00

9

5306 Sea

6

4755,00

31

3614 Air

8

160,15

1

6118 Air

9

1377,45

7

Port of loading POI Port MOTN of import Flight No. ETD / Name Estimated of ATD Vessel Actual time oftime ETA departure of POD departure Estimated ATA POD (DELIVER: Actual time oftime arrival L320) of arrival at port at ofport destination ETAofSite destination ATA Estimated Site Actual (DELIVER:L330) arrival timeat ofsite arrival at site (DELIVER: FKT_TV_KKS L400) Rijeka Alexandria 2016-10-20 Hamburg ALEXANDRIA # 00 Amsterdam 11UHA Bremen 2016-11-18 2016-12-02 40PUR Mumbai 2016-12-16 2017-01-05 00URA Frankfurt CAIRO MS1520/20 2017-01-16 2017-01-28 20MA Hamburg 2017-03-05 2017-03-12 11C ; 12C Busan ALEXANDRIA GUDRUN 2017-06-26 2017-06-24 2017-07-26 2017-08-05 40PAC MAERSK #961109598 Hamburg ALEXANDRIA MSC ATHENS 2017-06-28 2017-06-29 2017-07-18 2017-07-18 2017-07-28 40UBA #MSCURU915 287 Hamburg ALEXANDRIA MSC ATHENS 2017-06-28 2017-06-29 2017-07-18 2017-07-18 2017-07-28 40UBA #MSCURU912 698 Hamburg ALEXANDRIA MSC ATHENS 2017-06-28 2017-06-29 2017-07-18 2017-07-18 2017-07-28 40UBA; 41UBA; 42UBA #MSCURU899 242 Hamburg ALEXANDRIA MSC EDITH 2017-07-05 2017-07-04 2017-07-22 2017-07-23 2017-08-01 00 #MSCUOJ0933 08 Hamburg ALEXANDRIA RIO BLANCO 2017-07-05 2017-07-06 2017-07-15 2017-07-17 2017-07-25 00 #SGL572501 Hamburg ALEXANDRIA MSC EDITH 2017-07-05 2017-07-04 2017-07-22 2017-07-23 2017-08-01 00 #MSCUOJ0888 78 Hamburg ALEXANDRIA MSC EDITH 2017-07-05 2017-07-04 2017-07-22 2017-07-23 2017-08-01 40PGB #MSCUOJ0823 68 Shanghai ALEXANDRIA MSC 2017-07-06 2017-07-07 2017-08-03 2017-08-13 00 MELATILDE #MSCUKN203 563 Rijeka ALEXANDRIA HANSA 2017-07-11 2017-07-12 2017-07-30 2017-08-09 40BAT CLOPPENBURG # Rijeka ALEXANDRIA HANSA 2017-07-11 2017-07-12 2017-07-30 2017-08-09 40BAT CLOPPENBURG # Hamburg ALEXANDRIA MSC 2017-07-14 2017-07-14 2017-07-29 2017-08-08 10MA CAROUGE #MSCUOJ1278 90 Hamburg ALEXANDRIA MSC 2017-07-14 2017-07-14 2017-07-29 2017-08-08 1X; 2X; 3X; 40C ; 41C ; 42C CAROUGE ; 4X #MSCUOJ1210 67 Viracopos 2017-07-15 2017-07-27 40URA Hamburg ALEXANDRIA MSC EDITH 2017-07-19 2017-07-19 2017-08-05 2017-08-15 30MA #MSCUOJ2100 19 Hamburg ALEXANDRIA MSC EDITH 2017-07-19 2017-07-19 2017-08-05 2017-08-15 00 #MSCUOJ1960 77 Hamburg ALEXANDRIA MSC EDITH 2017-07-19 2017-07-19 2017-08-05 2017-08-15 40C ; 40PAH; 40PDB #MSCUOJ1806 34 Düsseldorf CAIRO AF341/21 2017-07-21 2017-07-22 2017-07-27 00MA ; 00MK AF6752/22 #05752956595 Düsseldorf CAIRO MS1520 + 2017-07-22 2017-07-22 2017-07-23 2017-07-23 2017-07-28 00EKH; 10MA ; 11MPB; 22MB ; MS541 #07731MB ; 42MB 96595332


2965 Sea

7

62165,00

315 Antwerpen

ALEXANDRIA

5303 Sea

1

9983,00

41 Antwerpen

ALEXANDRIA

6123 Air

1

61,00

0 D端sseldorf

5333 Sea

2

37490,00

60 Antwerpen

ALEXANDRIA

5332 Sea

2

7140,00

85 Antwerpen

ALEXANDRIA

6120 Air

1

130,00

6119 Air 6115 Sea

4 6

430,23 3758,60

1 D端sseldorf 27 Hamburg

5315 Air

1

20,14

0 D端sseldorf

5331 Sea

3

6150,00

27 Hamburg

6125 6124 6126 6122 5336

Air Air Air Air Sea

2 5 1 6 8

135,67 13,36 30,90 8186,00 2886,96

1 0 0 17 22

5337 Sea 4000 Sea

1 14

3161,25 83620,00

5 Hamburg 263 Hamburg

ALEXANDRIA ALEXANDRIA

4001 Sea

2

1679,00

1 Hamburg

ALEXANDRIA

4008 Air

1

732,72

0 Frankfurt

CAIRO

4005 Air

2

10380,00

9 Frankfurt

CAIRO

4007 Air

10

41,30

0 Frankfurt

CAIRO

4002 Sea

10

63860,00

184 Hamburg

ALEXANDRIA

4003 Sea 4004 Sea

6 1

36720,00 10172,06

119 Hamburg 38 Hamburg

ALEXANDRIA ALEXANDRIA

4006 Sea

1

7750,00

5 Hamburg

ALEXANDRIA

4011 Sea

6

36450,00

72 Hamburg

ALEXANDRIA

4009 Air

5

1510,00

4012 Sea

3

23640,00

14 Hamburg

ALEXANDRIA

4010 Sea 3501 Sea

2 30

3433,00 31746,00

59 Jakarta 36 Hamburg

ALEXANDRIA Alexandria

2 Prag

Prag D端sseldorf Prag Shanghai Hamburg

6 Vantaa

CAIRO

CAIRO

ALEXANDRIA CAIRO

ALEXANDRIA

ALEXANDRIA

CAIRO

SERENAY 1 #TBN SERENAY 1 #TBN MS1520/25 MS541/26 #077965985343 SERENAY 1 #TBN SERENAY 1 #TBN EK140/25 EK927/27 #17651853863 TBA # MSC DESIREE #MSCUOJ2687 85 AF341/28 AF6452/29 #05752956606 MSC BRANKA #

TBA # MSC DESIREE # MSC RANIA # CAP JERVIS #SEJ330492 CAP JERVIS #SEJ330310 LH8290 #0205216503 5 LH8290 #0205216502 4 KL8350 #0742987361 6 CAP HARVEY #SEJ334466 Vessel CAP HARRIETT #SEJ338339 CAP HAMILTON #SEJ340767 CAP HAMILTON #SEJ341937 LH7411/LH829 0 #0204128632 4 CAP HARRISSON #SEJ343753 APL SALALAH M/V CAP HAMILTON

2017-07-25

2017-08-08

2017-08-18

00

2017-07-25

2017-08-08

2017-08-18

40PAH

2017-07-25

2017-07-26

2017-07-31

00

2017-07-25

2017-08-08

2017-08-18

40MA

2017-07-25

2017-08-08

2017-08-18

40QU

2017-07-25

2017-07-27

2017-08-01

11BAA

2017-07-26 2017-07-26

2017-08-12

2017-08-22

00; 00EKH; 11MB ; 11UBA 00

2017-07-28

2017-07-29

2017-08-03

00ABA

2017-07-28

2017-08-12

2017-08-22

40LAC

2017-07-29 2017-07-29 2017-07-29 2017-07-29 2017-08-02

2017-08-05 2017-08-05 2017-08-05 2017-08-29

12MB ; 31MB 11MB ; 21MBL; 40UBA 11MB 40URA 00; 10C ; 30C ; 40C

2017-08-19

2017-08-09 2015-12-09

2015-12-09

2017-08-26 2015-12-19

2015-12-19

2017-09-05

2015-12-09

2015-12-09

2015-12-19

2015-12-19

00 2016-01-04 30UMA; 32UMB; 40UMA; 42UMB 2016-01-04 42UMB

2016-01-12

2016-01-12

2016-01-13

2016-01-13

2016-01-16 42UHN

2016-01-12

2016-01-12

2016-01-13

2016-01-13

2016-01-16 42UHN

2016-01-12

2016-01-12

2016-01-15

2016-01-15

2016-01-20 00

2015-12-30

2015-12-30

2016-01-09

2016-01-09

2016-01-21 22UMB; 30UMA; 40UMA

2016-01-06 2016-01-06

2016-01-07 2016-01-06

2016-01-16 2016-01-16

2016-01-16 2016-01-16

2016-01-23 12UMB 2016-01-23 40UMA

2016-01-20

2016-01-20

2016-01-30

2016-01-31

2016-02-03 42UHA

2016-01-20

2016-01-20

2016-01-30

2016-01-30

2016-02-09

2016-02-04 10UMA; 20UMA

2016-01-22

2016-01-22

2016-01-26

2016-01-26

2016-01-31

2016-02-04 00ABA

2016-01-27

2016-01-27

2016-02-06

2016-02-08

2016-01-17 2016-02-24

2016-01-18 2016-02-24

2016-02-15 2016-03-05

2016-02-15

2016-02-11 12UHA; 22UHA; 32UHA 2016-02-25 2016-03-31

2016-02-18 10URA 2016-03-22 00ABA


4030 Air

1

650,00

2 Frankfurt

CAIRO

4035 Air

1

1710,18

1 Frankfurt

CAIRO

4016 Sea

94

124916,00

890 Hamburg

Alexandria

4017 Sea

139

205560,00

1358 Hamburg

Alexandria

4014 Sea

6

135800,00

928 HuangPu

ALEXANDRIA

4015 Sea

2

30112,00

159 HuangPu

ALEXANDRIA

3503 Sea

31

206,60

1 Hamburg

Alexandria

4018 Air

1

35,00

0 Frankfurt

CAIRO

4041 Air

1

450,00

3 Frankfurt

CAIRO

47

55223,20

389 Hamburg

4032 Sea

38 Hamburg

Alexandria

4020 Sea

6

4400,00

4033 Sea

16

139100,00

4019 Sea

153

135070,00

947 Hamburg

4013 Sea

6

4400,00

38 Hamburg

ALEXANDRIA

4036 Sea

43

53305,39

74 Hamburg

Alexandria

4037 Sea

15

15113,00

95 Hamburg

Alexandria

4031 Sea

2

3655,00

17 Hamburg

ALEXANDRIA

4040 Sea

1

6363,89

38 Hamburg

ALEXANDRIA

4034 Sea

2

12400,00

103 Antwerpen

ALEXANDRIA

4047 Sea

23

44007,00

431 Hamburg

ALEXANDRIA

3506 Sea 4022 Sea

7 31

75,40 255230,00

4025 Sea

35

76810,00

4021 Sea

13

9676,90

4023 Sea

14

66826,58

3505 Sea

2

10053,00

77 Hamburg

ALEXANDRIA

4039 Sea

6

25805,00

29 Hamburg

ALEXANDRIA

1738 Koper

0 Hamburg 4321 Hamriya Free Zone 301 Hamburg 70 Jebel Ali Port

ALEXANDRIA DAMIETTA Alexandria

CAP Hamilton DAMIETTA ALEXANDRIA DAMIETTA

323 Laem Chabang ALEXANDRIA

MS6041/01 MS541/02 #07792292104 LH8290/08 #02052165061 M/V CAP JERVIS M/V CAP HAMILTON FRANBO PROSPECT #FP1601HPAL X01 FRANBO PROSPECT #FP1601HPAL X02 M/V CAP HARVEY MS6041/20 MS541/21 #07792292012 LH8290/13 #02052165083 M/V CAP HARVEY CAP HARVEY #SGL006426 HOHE BANK #

2016-03-01

2016-03-01

2016-03-02

2016-03-04

2016-03-22 42UHA

2016-03-08

2016-03-08

2016-03-08

2016-03-08

2016-03-22 00BZK

2016-02-17

2016-02-17

2016-02-27

2016-02-27

2016-02-24

2016-02-24

2016-03-05

2016-02-23

2016-02-25

2016-03-20

2016-03-21

2016-03-26 41MBR; 42MBR

2016-02-23

2016-02-25

2016-03-20

2016-03-21

2016-03-26 41MBR; 42MBR

M/V CAP HARRISSON CAP HARRISON #SGL004852 M/V CAP HARRIETT M/C CAP HARRIETT CAP JERVIS #SGL010805 CAP JERVIS #SGL020181 ARIF AMCA #013 CAP HAMILTON CAP Hamilton BBC SCOTLAND #HAMDAM001 CAP JERVIS #SGL015496 MAERSK EUPHRATES #MAEU956039 885 PUSAN #MSCUWT805 493 MSC ANTIGUA #MSCURV578 324 CAP HARRISON #SGL032379

2016-03-02

2016-03-15

2016-03-06

2016-03-23 00ABA

2016-03-31

2016-03-23 00ABA

2016-04-15

2016-04-03 00ABA

2016-02-20

2016-02-20

2016-02-21

2016-02-22

2016-04-04 00

2016-03-13

2016-03-13

2016-03-14

2016-03-18

2016-04-04 00

2016-02-29

2016-03-31

2016-04-05 00ABA

2016-03-09

2016-03-10

2016-03-20

2016-03-20

2016-04-05 31MBR; 32MBR

2016-03-16

2016-03-16

2016-03-21

2016-03-21

2016-04-09 10UMA; 20UMA; 30UMA; 40UMA 2016-04-11 00ABA

2016-03-02

2016-03-12 2016-03-03

2016-03-12

2016-03-12

2016-03-22

2016-04-13 41MBR; 42MBR

2016-03-15

2016-04-15

2016-04-13 00ABA

2016-03-15

2016-04-15

2016-04-13 00ABA

2016-03-23

2016-03-23

2016-04-02

2016-04-02

2016-03-23

2016-03-23

2016-04-02

2016-04-02

2016-04-16 20UMA

2016-03-25

2016-03-25

2016-04-09

2016-04-09

2016-04-16 41MBR; 42MBR

2016-03-31

2016-04-15

2016-04-12

2016-04-16 42MBR

2016-04-16 00ABA

2016-03-31 2016-03-20

2016-03-20

2016-04-15 2016-03-31

2016-04-01

2016-04-16 00ABA 2016-04-18 42MBR

2016-03-23

2016-03-23

2016-04-02

2016-04-02

2016-04-18 42MBR

2016-03-21

2016-03-20

2016-03-30

2016-03-30

2016-04-19 42MBR

2016-03-15

2016-03-15

2016-04-18

2016-04-18

2016-04-24 42MBR

2016-03-23

2016-03-30

2016-04-14

2016-04-14

2016-04-25 20UMA

2016-04-06

2016-04-06

2016-04-16

2016-04-16

2016-04-25 41MK ; 42MKA


3504 Sea

6

78,00

0 Hamburg

ALEXANDRIA

4059 Sea

19

45740,00

185 Hamburg

ALEXANDRIA

4048 Sea

9

74640,00

883 Koper

ALEXANDRIA

4049 Sea

2

13278,00

159 Hamburg

ALEXANDRIA

9000 Air

9

1857,00

10 Frankfurt

4027 Sea

110

73326,79

4028 Sea

6

4029 Sea

CAIRO

333 Ho Chi Minh Port

ALEXANDRIA

135800,00

928 HuangPu

ALEXANDRIA

2

29982,00

159 HuangPu

ALEXANDRIA

4065 Air

13

6749,00

31 Warschau

CAIRO

3508 Air

13

121,20

0 Frankfurt

CAIRO

3509 Air

16

121,10

1 Frankfurt

CAIRO

4051 Sea

2

3655,00

17 Hamburg

ALEXANDRIA

4050 Sea

35

76810,00

301 Hamburg

ALEXANDRIA

4053 Sea

13

9676,90

4058 Sea

3

51100,00

149 Hamburg

ALEXANDRIA

4069 Sea

31

114413,83

189 Hamburg

ALEXANDRIA

4094 Sea 2908 Air

4 8

6399,00 3343,00

18 Hamburg 8 Frankfurt

ALEXANDRIA CAIRO

4043 Sea

108

53344,00

241 Hamburg

ALEXANDRIA

4052 Sea

31

255230,00

4321 Hamriyah

4068 Sea

49

60426,93

199 Jebel Ali Port

DAMIETTA

4024 Sea

2

33985,86

172 Ho Chi Minh

ALEXANDRIA

4122 Air 4129 Air

14 2

12257,00 52,00

61 Hamburg 0 Frankfurt

CAIRO CAIRO

2909 Air

7

3212,00

7 Frankfurt

CAIRO

70 Jebel Ali

DAMIETTA

DAMIETTA

CAP HARRISON #SGL035115 CAP HARRISSON GRANDE SPAGNA VOY #1001 CAP HARRISON #SGL035073 KL8350/21MP 8960 #0742987363 1 XUTRA BHUM #MSCUVH470 113 SMART TINA #ST1601HPAL X01 SMART TINA #ST1601HPAL X02 KU176/16.04. KU541/17.04. MS6053/19 MS541/20 #07792581123 LH8290/21 #02052165153 CAP HARVEY #SGL033356 CAP HARVEY #SGL032371 MAERSK GANGES #MAEU956246 274 MSC AGADIR #MSCURV605 051 MSC AGADIR #MSCUKG367 101 MSC AGADIR LH8290/28 #02052165201 CMA CGM MARCO POLO BBC ORION #HAMDAM001 MAERSK INDUS #MAEU956387 159 UNION DEMETER #UD1603HCM ALX02 H8290/26.04. MS6401 MS541 #07792581182 MS6041/04 / MS541/06 #07792858942

2016-04-06

2016-04-06

2016-04-08

2016-04-16

2016-04-16

2016-04-25 41MK ; 42MKA

2016-04-21

2016-04-25 00ABA

2016-04-04

2016-04-04

2016-04-14

2016-04-14

2016-04-06

2016-04-06

2016-04-16

2016-04-16

2016-01-23

2016-01-23

2016-01-23

2016-01-28

2016-04-27 00ABA

2016-03-13

2016-03-15

2016-04-18

2016-04-18

2016-04-27 42MBR

2016-03-18

2016-03-04

2016-04-24

2016-04-24

2016-04-28 31MBR; 32MBR

2016-03-18

2016-03-04

2016-04-24

2016-04-24

2016-04-07

2016-04-26 10UMA; 20UMA 2016-04-26

2016-05-04

2016-04-15

2016-04-26 41MBL; 42MBL

2016-04-28 31MBR; 32MBR 2016-05-04 00ABA

2016-04-20

2016-04-19

2016-04-20

2016-04-20

2016-04-25

2016-05-04 41MK

2016-04-20

2016-04-21

2016-04-21

2016-04-21

2016-04-26

2016-05-04 41MK

2016-04-13

2016-04-13

2016-04-23

2016-04-24

2016-05-08 41MBR

2016-04-13

2016-04-13

2016-04-23

2016-04-24

2016-05-09 41MBR

2016-04-11

2016-04-11

2016-04-23

2016-04-23

2016-04-20

2016-04-20

2016-05-07

2016-05-07

2016-05-16 00

2016-04-20

2016-04-20

2016-05-07

2016-05-07

2016-05-16 32MB ; 41MB ; 42MB

2016-04-20 2016-04-28

2016-04-20 2016-04-29

2016-05-07 2016-04-28

2016-05-07 2016-04-28

2016-05-16 00ABA 2016-05-16 00MB ; 42MB

2016-03-31

2016-04-29

2016-05-03

2016-05-11 41MBR

2016-05-17 00ABA

2016-04-20

2016-04-24

2016-05-05

2016-05-05

2016-05-17 41MBR

2016-04-25

2016-04-25

2016-05-04

2016-05-04

2016-05-17 41MBR

2016-03-31

2016-04-10

2016-05-02

2016-05-02

2016-05-18 42MBR

2016-04-26 2016-04-28

2016-04-28

2016-04-30 2016-04-29

2016-04-29

2016-05-18 00ABA 2016-05-18 00MB

2016-04-30

2016-05-06

2016-05-06

2016-05-06

2016-05-18 00MK ; 41MB


4093 Air 3515 Air

1 6

156,00 78,00

0 Shanghai 0 Frankfurt

4026 Sea

9

117860,00

2900 Sea

6

5,86

0 Blexen

BURULLUS

4066 Sea

1

456500,00

447 Blexen

BURULLUS

4063 Sea

9

106170,00

3522 Air

1

5,00

0 Frankfurt

CAIRO

4135 Air

7

14886,75

28 Frankfurt

CAIRO

4046 Sea

1

395210,00

2902 Sea

5

28291,01

43 Blexen

2905 Sea

6

5,86

0 Blexen

ALEXANDRIA

2907 Sea

4

28291,01

49 Blexen

ALEXANDRIA

4085 Sea

1

456009,00

444 Blexen

BURULLUS

4088 Air

8

19980,00

145 Incheon

CAIRO

4086 Sea 3507 Air

1 8

394000,00 39,54

240 Blexen 0 Frankfurt

BURULLUS CAIRO

2911 Air

1

28,00

0 Frankfurt

0 4057 Sea

0 87

0,00 72616,20

0 395 Hamburg

ALEXANDRIA

4097 Sea

12

120049,00

919 Hamburg

ALEXANDRIA

4126 Sea

1

4533,31

38 Hamburg

ALEXANDRIA

3514 Sea

10

5280,00

9 Hamburg

ALEXANDRIA

4084 Sea 4118 Sea

22 7

13460,00 139601,95

18 Hamburg 675 Hamburg

ALEXANDRIA ALEXANDRIA

1260 Ho Chi Minh Port

1195 Hamriya Free Zone

240 Charleston

CAIRO CAIRO ALEXANDRIA

ALEXANDRIA

BURULLUS BURULLUS

CAIRO

EK9873/24 LH087/27/LH8 290/28 #02052165190 UNION DEMETER #UD1603HCM ALX01 ROCHEFORT #ROCH-BLEBUR-1A ROCHEFORT #ROCH-BLEBUR-1A TRADE NAVIGATOR #JEBAL01 KL8350/06 /KL8910/09 #07429873686 MS540/06 /MS541/08 #07792858953 MUSKETIER #MUSK-CHABUR-1 ROCHEFORT #ROCH-BLEBUR-1A MITTELPLATE #MITT-BLEBUR-1B MITTELPLATE #MITT-BLEBUR-1C MITTELPLATE #MITT-BLEBUR-1B CV6353 + CV8501 MITTELPLATE LH7103A/09 / LH584/11 #02052165212 MS 541/13 #07792858931 MSC PINA #MSCURV631 180 MSC PINA #MSCUKG401 264 CAP HARRIETT #SEJJSGL139 866 MSC PINA #MSCUKG382 241 MSC PINA MSC PINA #MSCURV653 499

2016-05-04 2016-05-26

2016-04-24 2016-04-27

2016-04-24 2016-04-28

2016-04-24 2016-04-28

2016-05-18 00 2016-05-18 31MKA; 32MKA

2016-03-31

2016-04-10

2016-05-05

2016-05-05

2016-05-19 42MBR

2016-04-25

2016-04-25

2016-05-10

2016-05-12

2016-05-20 42MB

2016-04-25

2016-04-25

2016-05-10

2016-05-12

2016-05-20 42MB

2016-04-15

2016-04-25

2016-05-13

2016-05-12

2016-05-22 41MBR

2016-05-06

2016-05-06

2016-05-09

2016-05-09

2016-05-06

2016-05-06

2016-05-08

2016-05-08

2016-05-22 41MB ; 42C ; 42MB

2016-04-22

2016-04-25

2016-05-20

2016-05-20

2016-05-23 42MKA

2016-04-25

2016-04-25

2016-05-10

2016-05-12

2016-05-24 42MB

2016-04-30

2016-04-30

2016-05-14

2016-05-14

2016-04-30

2016-04-30

2016-05-14

2016-05-14

2016-05-24 41MB

2016-04-30

2016-04-30

2016-05-13

2016-05-14

2016-05-24 41MB

2016-05-11

2016-05-11

2016-05-17

2016-05-17

2016-04-30 2016-05-09

2016-04-30 2016-05-09

2016-05-14 2016-05-05

2016-05-14 2016-05-05

2016-05-29 41MK 2016-05-29 31MBR; 32MBR; 41MK

2016-05-13

2016-05-14

2016-05-15

2016-05-15

2016-05-29 11MB

2016-03-09 2016-04-20

2016-04-28

2016-03-28 2016-05-14

2016-05-14

2016-05-30 2016-05-30 31MKA; 32MK ; 41MK ; 42MK ; 42MKA

2016-04-27

2016-04-28

2016-05-14

2016-05-14

2016-05-31 41MPB; 42MPB

2016-05-04

2016-05-04

2016-05-14

2016-05-14

2016-05-24

2016-05-31 40UBA

2016-04-27

2016-04-28

2016-05-14

2016-05-14

2016-05-24

2016-06-01 00BTA; 41BTA; 42BTA

2016-04-27 2016-04-27

2016-04-28 2016-04-28

2016-05-14 2016-05-14

2016-05-15 2016-05-14

2016-05-24

2016-06-01 00BTA; 41BTA; 42BTA 2016-06-01 00UBA; 41UBA; 42UBA; 99UBA

2016-05-14

2016-05-24

2016-05-22

2016-05-22 42C

2016-05-24 41MB

2016-05-25 00


3516 Air

8

192,00

1 Charlotte

CAIRO

AF6731/19.05. AF6752/21.05.

2016-05-03

4170 Air

3

80,00

0 Frankfurt

CAIRO

2016-05-14

2016-05-20

2016-05-20

2016-05-20

2016-06-01 40MB

4082 Sea 4096 Sea

2 46

8200,00 128238,00

40 Hamburg 357 Hamburg

ALEXANDRIA ALEXANDRIA

2016-04-27 2016-04-27

2016-04-28 2016-04-28

2016-05-15 2016-05-14

2016-05-15 2016-05-14

2016-06-02 41MB ; 42MB 2016-06-02 41MPB; 42MPB

3512 Sea

5

2692,00

13 Hamburg

ALEXANDRIA

MS6051/ MS541 MSC PINA MSC PINA #MSCUKG390 210 CAP HAMILTON #SGL073811 CAP JERVIS #SGL063793 CAP HAMILTON #SGL119768 LH7105S LH8290 #02052165120 BBC FRANCE #FRAN-CHABUR-2 CFL PERFECT #004 CFL PERFECT #003 CFL PERFECT #005 CFL PERFECT #010 LH8290 #02052165374 MSC PINA #MSCUKG412 113 MSC FLAMINIA #MSCURV650 313 SCHILLIG SCHILLIG #SCHI-BLEBUR-1B SCHILLIG #SCHI-BLEBUR-2B SCHILLIG #SCHI-BLEBUR-1C SCHILLIG #SCHI-BLEBUR-2C SCHILLIG #SCHI-BLEBUR-1B CFL PERFECT #012 MSC UMA #MSCUUF079 703 MSC UMA #MSCUUF081 337 MSC ATHOS #MSCURV644 688

2016-05-04

2016-05-04

2016-05-14

2016-05-14

2016-06-02 32MB ; 42MB

2016-04-13

2016-05-04

2016-05-14

2016-05-14

2016-05-04

2016-05-04

2016-05-14

2016-05-15

2016-05-24

2016-06-04 31C ; 31MB ; 32MB ; 41C ; 41MB ; 42MB

2016-04-05

2016-04-05

2016-04-06

2016-07-06

2016-04-11

2016-06-05 00

2016-04-29

2016-04-29

2016-05-23

2016-05-23

2016-06-05 32MKA

2016-04-29

2016-05-13

2016-05-26

2016-05-26

2016-06-05 41MBV; 41MPR; 42MBV; 42MPR

2016-05-09

2016-05-13

2016-05-26

2016-05-26

2016-06-05 42MBL

2016-05-13

2016-05-13

2016-05-26

2016-05-25

2016-06-05 20UEN

2016-05-13

2016-05-13

2016-05-26

2016-05-26

2016-06-05 41MBL

2016-05-26

2016-05-26

2016-05-26

2016-05-26

2016-06-05 11MB

2016-04-27

2016-04-28

2016-05-14

2016-05-15

2016-04-30

2016-04-30

2016-05-14

2016-05-15

2016-06-06 00

2016-05-02 2016-05-02

2016-05-02 2016-05-02

2016-05-15 2016-05-15

2016-05-16 2016-05-16

2016-06-06 32MB 2016-06-06 31MB

2016-05-02

2016-05-02

2016-05-15

2016-05-16

2016-06-06 32MB

2016-05-02

2016-05-02

2016-05-15

2016-05-16

2016-06-06 31MB

2016-05-02

2016-05-02

2016-05-15

2016-05-16

2016-06-06 32MB

2016-05-02

2016-05-02

2016-05-15

2016-05-16

2016-06-06 31MB

2016-05-13

2016-05-13

2016-05-26

2016-05-26

2016-06-06 41MB ; 42MB

2016-05-01

2016-05-04

2016-05-21

2016-05-21

2016-06-07 00ABA

2016-05-04

2016-05-05

2016-05-21

2016-05-21

2016-06-07 00ABA

2016-05-04

2016-05-04

2016-05-21

2016-05-21

2016-06-07 00BZK; 11MB ; 12MB ; 21MB ; 22MB ; 31MB ; 31MBA; 32MB ; 32MBA; 41MB ; 41MBA; 42MB ; 42MBA

4073 Sea

8

7780,00

34 Hamburg

ALEXANDRIA

4089 Sea

77

41632,34

145 Hamburg

ALEXANDRIA

6000 Air

1

5,10

4070 Sea

1

395210,00

240 Charleston

4106 Sea

22

133960,00

1422 Antwerpen

ALEXANDRIA

4077 Sea

1

7575,00

58 Antwerpen

ALEXANDRIA

4128 Sea

4

25985,00

160 Antwerpen

ALEXANDRIA

4125 Sea

1

7575,00

58 Antwerpen

ALEXANDRIA

3523 Air

4

25,00

0 Frankfurt

4092 Sea

12

11838,63

53 Hamburg

ALEXANDRIA

4079 Sea

7

95950,00

310 Antwerpen

ALEXANDRIA

4080 Sea 4067 Sea

1 1

456000,00 456500,00

447 Blexen 441 Blexen

BURULLUS BURULLUS

2906 Sea

6

5,86

0 Blexen

BURULLUS

2903 Sea

9

29567,21

44 Blexen

BURULLUS

2904 Sea

9

31075,21

44 Blexen

BURULLUS

2901 Sea

6

5,86

0 Blexen

BURULLUS

4083 Sea

8

46200,00

358 Antwerpen

ALEXANDRIA

4119 Sea

23

11771,55

27 Le Havre

ALEXANDRIA

3519 Sea

6

3559,50

6 Le Havre

ALEXANDRIA

4078 Sea

33

61949,18

458 Hamburg

ALEXANDRIA

0 Duesseldorf

CAIRO BURULLUS

CAIRO

2016-05-21

2016-06-01 31MKA; 32MKA

2016-06-04 31MB ; 32MB ; 41MB ; 42MB

2016-05-24

2016-06-06 00; 41MK


4038 Sea

1

572,00

2 Charleston

4104 Sea

2

55800,00

356 Antwerpen

ALEXANDRIA

4100 Sea

1

24000,00

101 Antwerpen

ALEXANDRIA

4101 Sea

8

46200,00

358 Hamburg

ALEXANDRIA

4062 Sea

2

35830,48

288 Antwerpen

ALEXANDRIA

4112 Sea

49

60409,39

199 Jebel Ali Port

DAMIETTA

4110 Sea

13

9676,90

70 Jebel Ali Port

DAMIETTA

2910 Air

2

626,00

4105 Sea

2

46500,00

173 Antwerpen

ALEXANDRIA

4095 Sea 4107 Sea

1 2

395210,06 35118,00

240 Charleston 193 Hamburg

BURULLUS ALEXANDRIA

4087 Sea 4056 Sea

7 2

106202,50 34086,00

675 Hamburg 333 Antwerpen

ALEXANDRIA ALEXANDRIA

4108 Sea

4

4400,00

31 Hamburg

ALEXANDRIA

4102 Sea

4

27350,00

118 Hamburg

ALEXANDRIA

3525 Air

1

4,00

0 Frankfurt

CAIRO

4186 Air

8

11238,68

65 Frankfurt

CAIRO

4103 Sea

38

38295,00

67 Hamburg

ALEXANDRIA

4138 Sea

7

33045,00

152 Hamburg

ALEXANDRIA

4127 Sea

44

126544,00

909 Hamburg

4064 Sea

2

370000,00

312 Constanta

4148 Sea

6

17855,00

55 Hamburg

ALEXANDRIA

4137 Sea

46

128238,00

357 Hamburg

ALEXANDRIA

4042 Sea

25

93149,00

141 HuangPu

ALEXANDRIA

4044 Sea

7

54781,00

782 Shanghai

ALEXANDRIA

5 Frankfurt

DAMIETTA

OOCL KAOHSIUNG #HLCUHOU16 0408679 CFL PERFECT #011 CFL PERFECT #006 MSC ATHOS #MSCURV677 324 CFL PERFECT #009 MAERSK EUPHRATES #956542404 MAERSK EUPHRATES #956529621 MS6051/18 / MS541/20 #07792858920 CFL PERFECT #008 BBC FRANCE MSC ATHOS #MSCUKG426 759 MSC ATHOS CFL PERFECT #001 MSC ATHOS #MSCUKG417 203 MSC LUCIANA #MSCUKG417 625 KL8350 KL553 #074-2987 3723 KL8354 MP8940 #07429873745 MSC LUCIANA #MSCURV664 249 MSC ARBATAX #MSCUKG444 074

2016-04-09

2016-04-08

2016-04-23

2016-04-23

2016-04-27

2016-05-13

2016-05-26

2016-05-26

2016-06-08 41MB ; 42MB

2016-04-27

2016-05-13

2016-05-26

2016-05-26

2016-06-08 00EKH

2016-05-04

2016-05-04

2016-05-21

2016-05-21

2016-06-08 31MB ; 32MB

2016-05-13

2016-05-13

2016-05-26

2016-05-26

2016-06-08 41MB ; 42MB

2016-05-13

2016-05-16

2016-05-25

2016-05-25

2016-05-13

2016-05-16

2016-05-25

2016-05-25

2016-06-08 32MBR

2016-05-18

2016-06-18

2016-05-20

2016-05-20

2016-06-08 11MB ; 40MB

2016-04-27

2016-05-13

2016-05-26

2016-05-26

2016-06-09 20UEN

2016-04-30 2016-05-04

2016-04-29 2016-05-16

2016-05-21 2016-05-21

2016-05-23 2016-05-21

2016-06-09 31MKA 2016-06-09 41UBA; 42UBA

2016-05-05 2016-05-13

2016-05-04 2016-05-13

2016-05-21 2016-05-26

2016-05-21 2016-05-25

2016-06-09 00UBA; 41UBA; 42UBA 2016-06-09 31MBR; 32MBR

2016-05-13

2016-05-04

2016-05-21

2016-05-21

2016-06-09 31MBA; 32MBA; 41MBA; 42MBA

2016-04-27

2016-05-12

2016-05-28

2016-05-28

2016-05-26

2016-05-26

2016-06-05

2016-06-05

2016-06-10 00BZK

2016-05-31

2016-05-31

2016-06-02

2016-06-02

2016-06-10 42MKA

2016-04-29

2016-05-12

2016-05-28

2016-05-28

2016-06-11 31MKA; 32MKA

2016-05-11

2016-05-12

2016-05-29

2016-05-29

2016-06-08

2016-06-11 00EKH; 20UEN; 41C ; 42C

ALEXANDRIA

MSC ARBATAX #MSCURV681 425

2016-05-11

2016-05-12

2016-05-28

2016-05-28

2016-06-07

2016-06-11 31MB ; 32MB ; 41MBV; 41MPR; 42MBV; 42MPR

BURULLUS

CIMBRIS #CIMB-CONBUR-1 RIO DE LA PLATA #SGL169281 MSC LUCIANA #MSCURV681 573 AMBER BEVERLY # AMBER BEVERLY #AB1601SHAL X01

2016-05-30

2016-05-27

2016-06-01

2016-06-01

2016-06-11

2016-06-11 41BAT; 42BAT

2016-06-01

2016-05-18

2016-05-28

2016-05-28

2016-05-01

2016-05-12

2016-05-28

2016-05-28

2016-03-31

2016-04-22

2016-06-05

2016-06-05

2016-06-13 42BBT; 42BFT

2016-03-31

2016-04-22

2016-06-05

2016-06-05

2016-06-13 41MBL

CAIRO

2016-05-03

2016-06-04

2016-05-22

2016-06-08 42MKA

2016-06-08 32MBR

2016-06-10 32MBJ; 42MBJ

2016-06-11 31BFT; 32BFT; 42BJT 2016-06-07

2016-06-12 31MPB; 32MPB


4045 Sea

7

54781,00

782 Shanghai

ALEXANDRIA

4124 Sea

10

74369,00

793 Hamburg

ALEXANDRIA

2913 Air

12

6594,00

15 Frankfurt

4177 Air 4076 Sea

2 9

3530,00 76848,00

14 Frankfurt 674 Hamburg

2912 Air

1

30,00

0 Frankfurt

CAIRO

4176 Air

1

68,00

0 Frankfurt

CAIRO

4055 Sea

2

33985,86

180 Laem Chabang ALEXANDRIA

4098 Sea

4

67971,72

359 Laem Chabang ALEXANDRIA

3527 Air

8

31,09

0 Frankfurt

4173 Sea 4223 Air

12 12

4168,00 5944,00

40 Hamburg 38 Frankfurt

ALEXANDRIA CAIRO

4132 Sea

5

25630,00

172 Hamburg

ALEXANDRIA

4072 Sea

8

3172,00

40 Shanghai

ALEXANDRIA

4134 Sea

49

124500,39

225 Hamburg

ALEXANDRIA

4204 Air

12

11993,64

27 Frankfurt

4121 Sea

9

106170,00

4074 Sea

4

63720,80

317 Shanghai

ALEXANDRIA

4109 Sea

6

93650,00

299 Antwerpen

ALEXANDRIA

3510 Air

4

97,00

0 New York

CAIRO

2915 Air

1

44,00

0 Frankfurt

CAIRO

4231 Air

1

293,50

1 Frankfurt

CAIRO

31

255230,00

4111 Sea

1195 Jebel Ali Port

4321 Hamriya Port

CAIRO CAIRO ALEXANDRIA

CAIRO

CAIRO

DAMIETTA

DAMIETTA

AMBER BEVERLY MSC SEATTLE #MSCUKG446 426 MS6051 MS541 #07792858861 LH8290 MSC ATHOS #MSCUKG402 643 MS6051/19 /MS541/20 #07792858905 MS6051/19 /MS541/20 AMBER BEVERLY #AB1601LCBA LX01 AMBER BEVERLY #AB1601LCBA LX02 KL8350 KL553 #074-2987 3756 MSC ANTIGUA KL8350 / MP8940 MSC CATERINA #MSCUKG451 384 HANJIN TABUL #YMLUM2313 26807 MSC ANTIGUA #MSCUKG459 932 ZZ404 / MS541 #0779295607 6 BBC CAROLINA # COSCO EUROPE #YMLUM2313 25318 MSC SEATTLE #MSCUKG446 434 CV3167/07 / CV5801/09 #17216887404 MS540 / MS541 #0779295608 0 MS6051 / MS541 #0779295611 3 BBC CAROLINA #

2016-03-31

2016-04-22

2016-06-05

2016-06-05

2016-06-13 42MBL

2016-05-14

2016-05-15

2016-05-28

2016-05-28

2016-06-13 41MBL

2016-05-24

2016-05-25

2016-05-28

2016-05-28

2016-06-13 31MB ; 32MB

2016-05-31 2016-05-04

2016-05-31 2016-05-04

2016-05-31 2016-05-21

2016-06-01 2016-05-21

2016-06-13 00EKH; 20UEN 2016-06-14 42MBL

2016-05-19

2016-05-19

2016-05-20

2016-05-20

2016-06-14 00MB

2016-05-19

2016-05-20

2016-05-20

2016-05-20

2016-06-14 00MB

2016-04-20

2016-05-02

2016-06-02

2016-06-05

2016-06-15 41MBR

2016-05-02

2016-05-02

2016-06-02

2016-06-05

2016-06-15 31MBR; 32MBR

2016-05-24

2016-06-06

2016-06-09

2016-06-09

2016-06-20 32MKA; 42MKA

2016-05-25 2016-06-05

2016-05-25 2016-06-05

2016-06-12 2016-06-09

2016-06-12 2016-06-09

2016-05-04

2016-05-18

2016-05-28

2016-05-28

2016-06-20 31BAC; 32BAC; 41BAC; 42BAC

2016-05-11

2016-05-11

2016-06-06

2016-06-06

2016-06-21 31MBL; 32MBL; 41MBL; 42MBL

2016-05-23

2016-05-25

2016-06-11

2016-06-12

2016-06-03

2016-06-03

2016-06-08

2016-06-08

2016-06-21 31MB ; 32MB ; 41MB ; 42MB

2016-05-13

2016-05-26

2016-06-06

2016-06-09

2016-06-22 32MBR

2016-05-04

2016-05-04

2016-06-05

2016-06-05

2016-05-14

2016-05-15

2016-05-28

2016-05-28

2016-05-06

2016-05-08

2016-05-10

2016-05-10

2016-05-14

2016-06-25 42MKA

2016-06-08

2016-06-08

2016-06-10

2016-06-10

2016-06-15

2016-06-25 00MK

2016-06-11

2016-06-11

2016-06-15

2016-06-15

2016-06-20

2016-06-25

2016-05-13

2016-05-23

2016-06-06

2016-06-09

2016-06-21

2016-06-21

2016-06-15

2016-06-20 00C 2016-06-20 00C ; 30C ; 40C

2016-06-21 31MB ; 32MB ; 41MB ; 42MB

2016-06-23 31MBL; 32MBL; 41MBL; 42MBL

2016-06-23 00

2016-06-25 32MBR


4143 Sea

12

38530,00

110 Hamburg

ALEXANDRIA

CAP HARRIETT #SEJJSGL182 131

2016-05-25

2016-05-24

2016-06-04

2016-06-04

4123 Sea

8

142459,30

772 Hamburg

ALEXANDRIA

2016-06-01

2016-06-01

2016-06-18

2016-06-18

2016-06-28

2016-06-26 31UBA; 32UBA

4197 Air 4091 Sea

6 8

55,20 37080,00

1 Frankfurt 168 Hamburg

CAIRO ALEXANDRIA

2016-06-04 2016-04-28

2016-06-04 2017-07-28

2016-06-05 2017-07-14

2016-06-06 2016-05-15

2016-06-10 2017-07-24

2016-06-26 00 2016-06-27 31MKC; 32MKC; 41MKC; 42MKC

4168 Sea

1

7900,00

2016-05-20

2016-05-22

2016-06-04

2016-06-04

2016-06-14

2016-06-27 00

4136 Sea

2

35118,00

193 Hamburg

ALEXANDRIA

2016-05-25

2016-05-25

2016-06-12

2016-06-12

2016-06-22

2016-06-27 31UBA; 32UBA

3520 Sea

2

740,00

2 Hamburg

ALEXANDRIA

2016-05-18

2016-05-18

2016-06-04

2016-06-04

2016-06-14

2016-06-27 42MBR

3521 Sea

1

230,00

0 Hamburg

ALEXANDRIA

2016-05-10

2016-05-18

2016-06-04

2016-06-04

2016-06-14

2016-06-27 42BAC

4147 Sea

11

132334,00

305 Antwerpen

ALEXANDRIA

2016-05-13

2016-05-22

2016-06-04

2016-06-04

2016-06-14

2016-06-27 00

4099 Sea

14

66736,58

323 Laem Chabang ALEXANDRIA

2016-05-15

2016-05-10

2016-06-06

2016-06-15

1

29650,00

140 Danzig

2016-06-06

2016-06-06

2016-06-07

2016-06-07

2016-06-12

2016-06-29 30EKH

4060 Sea

26

6798,00

23 Norfolk

DAMIETTA

2016-04-09

2016-04-25

2016-05-09

2016-05-09

2016-05-19

2016-06-30 42MKA

4081 Sea

39

13772,00

54 Norfolk

DAMIETTA

2016-05-13

2016-05-12

2016-05-28

2016-05-28

2016-06-07

2016-06-30 31MKA; 32MKA

3511 Sea

2

130,00

0 Norfolk

DAMIETTA

2016-04-28

2016-04-28

2016-05-09

2016-05-09

2016-05-19

2016-07-01 42MKA

4133 Sea

4

64000,00

402 Antwerpen

ALEXANDRIA

2016-04-30

2016-06-03

2016-06-15

2016-06-15

2016-06-25

2016-07-03 31MB ; 32MB

4115 Sea

2

12400,00

103 Antwerpen

ALEXANDRIA

2016-05-06

2016-06-03

2016-06-15

2016-06-15

2016-06-25

2016-07-03 31MBR; 32MBR

4155 Sea

34

169759,00

1662 Antwerpen

ALEXANDRIA

2016-05-12

2016-06-03

2016-06-15

2016-06-15

2016-06-25

2016-07-03 31MBV; 31MPR; 32MBV; 32MPR

4159 Sea

2

46500,00

173 Antwerpen

ALEXANDRIA

2016-05-17

2016-06-03

2016-06-15

2016-06-15

2016-06-25

2016-07-03 30EKH

4156 Sea

1

29900,00

140 Antwerpen

ALEXANDRIA

2016-05-19

2016-03-06

2016-06-15

2016-06-15

2016-06-25

2016-07-03 20UEN

4149 Air

9

756,44

2016-05-31

2016-05-31

2016-06-01

2016-06-01

2016-06-06

2016-07-03 11MB

4225 Air

1

1105,00

2016-06-15

2016-06-15

2016-06-17

2016-06-17

2016-06-22

2016-07-03 42MBR

4202 Air

1

2016-06-03

2016-06-03

2016-06-01

2016-06-01

2016-06-06

2016-07-03 00

4189 Air

1

MSC ALTAMIRA #MSCURV708 996 KL8530 KL553 MSC PINA #MSCUKG382 159 MSC MELISSA #MSCURV732 970 MSC ANTIGUA #MSCURV709 093 MSC CATERINA #MSCURV714 218 MSC CATERINA #MSCURV691 952 MSC MELISSA #MSCURV722 575 MSC ROCHELLE #MSCUWT869 010 VDA2250/06 #41201479870 NINGBO EXPRESS #NRWB32475 87 OOCL ITALY #HLCUHOU16 0521034 + NINGBO EXPRESS #NREG324757 2 MAPLE INGRID #003 MAPLE INGRID #007 MAPLE INGRID #004 MAPLE INGRID #005 MAPLE INGRID #0104154 MS6051 MS541 #07792858846 EK3737/15 EK9277/17 #17664460922 MS6051 MS541 #07792956043 MS6051 MS541

2016-05-25

2016-05-25

2016-05-27

2016-05-27

2016-06-01

2016-07-03 00MB

4210 Air

40 Antwerpen

ALEXANDRIA

CAIRO

3 Frankfurt

CAIRO

1 Bangkok

CAIRO

204,50

1 Frankfurt

CAIRO

200,00

1 Frankfurt

CAIRO

2016-06-26 00BHT; 41BFT; 42BFT

2016-06-29 32MBR


4144 Sea

2

24200,00

63 Hamburg

ALEXANDRIA

4178 Sea 4054 Sea

2 14

370000,00 66736,58

312 Rotterdam BURULLUS 323 Laem Chabang ALEXANDRIA

4061 Sea

24

82048,00

118 Shanghai Port ALEXANDRIA

4163 Sea

9

9822,00

51 Hamburg

ALEXANDRIA

4090 Sea

35

76810,00

301 Hamburg

ALEXANDRIA

4171 Sea

2

3593,00

15 Hamburg

ALEXANDRIA

4195 Sea 4257 Air

1 5

8250,00 1270,00

38 Hamburg 8 Frankfurt

ALEXANDRIA CAIRO

4258 Air

11

2647,00

22 Frankfurt

CAIRO

4120 Sea

30

17179,65

50 Hamburg

ALEXANDRIA

4158 Sea

15

27640,00

162 Hamburg

ALEXANDRIA

4140 Air

1

664,00

3 Ho Chi Minh

Cairo

3513 Sea

2

1060,00

3 Hamburg

ALEXANDRIA

4162 Sea

1

2370,00

4 Hamburg

ALEXANDRIA

4150 Sea

47

24045,35

81 Hamburg

ALEXANDRIA

4174 Sea

ALEXANDRIA

MSC SEATTLE #MSCURV714 754 BONACIEUX MSC ROCHELLE #MSCUWT842 314 CHONG MING #CPJQCM13S HAALY02 RIO BRAVO #SGL174966 CAP HARRIETT #SGL090747

2016-05-14

2016-05-15

2016-05-28

2016-05-28

2016-06-07

2016-07-04 00EKH

2016-06-09 2016-04-12

2016-06-09 2016-04-12

2016-06-23 2016-05-26

2016-06-23 2016-05-26

2016-07-03 2016-06-05

2016-07-10 31BAT; 32BAT 2016-07-11 41MBR

2016-05-17

2016-05-17

2016-06-18

2016-06-19

2016-06-28

2016-07-12 31BBT; 32BBT

2016-05-23

2016-06-08

2016-06-18

2016-06-18

2016-06-28

2016-07-12 42MBR

2016-05-25

2016-05-25

2016-06-04

2016-06-04

2016-06-14

2016-07-12 32MBR

RIO BRAVO #SGL203921 RIO BRAVO MS540/23 MS541/24 #07792956220 MS6051/30 MS540/01 #07792956275 CAP HAMILTON #SGL139766 CAP HARRIETT + CAP JERVIS #SGL174741 + 56981413

2016-06-08

2016-06-08

2016-06-18

2016-06-18

2016-06-28

2016-07-12 31MBR

2016-06-08 2016-06-23

2016-06-08 2016-06-23

2016-06-18 2016-06-24

2016-06-18 2016-06-24

2016-06-28 2016-06-29

2016-07-12 42BAA 2016-07-12 00MK

2016-06-30

2016-06-30

2016-07-01

2016-07-01

2016-07-06

2016-07-12 00C ; 00UBA; 31UBA; 32UBA; 41UBA; 42UBA; 99UBA

2016-05-04

2016-05-04

2016-05-14

2016-05-14

2016-05-24

2016-05-17

2016-05-25

2016-06-04

2016-06-04

2016-06-14

2016-07-13 31BAB; 31MB ; 32BAB; 32MB ; 41BAB; 41C ; 41MB ; 42BAB; 42C ; 42MB 2016-07-13 00BRU; 20UEN

TH4164/12 / SV831/13 CAP JERVIS #SGL171985 CAP HARRIETT #SEJJSGL174 141

2016-05-19

2016-06-10

2016-07-13 42MBR

2016-05-23

2016-05-23

2016-06-11

2016-06-11

2016-06-21

2016-07-13 41MBL; 42MBL

2016-05-25

2016-05-24

2016-06-04

2016-06-04

2016-06-14

2016-07-13 00UBA

CAP JERVIS #SGL204832

2016-05-30

2016-05-31

2016-06-11

2016-06-11

2016-06-21

CAP JERVIS #SGL186861 MS6051/23 MS541/24 #07792956205 MS540/24 MS541/26 #07792956231 KL8350/02 KL553/03 #07429873885 CAP HARRIETT #SGL173072

2016-06-01

2016-06-01

2016-06-11

2016-06-11

2016-06-21

2016-07-13 00C ; 31MB ; 31UBA; 32MB ; 32UBA; 41MB ; 41UBA; 42BBT; 42UBA 2016-07-13 31BTA; 32BTA

2016-06-23

2016-06-23

2016-06-24

2016-06-24

2016-06-29

2016-07-13 00

2016-06-24

2016-06-24

2016-06-26

2016-06-24

2016-07-01

2016-07-13 00

2016-07-02

2016-07-02

2016-07-03

2016-07-03

2016-07-08

2016-07-13 00EKH

2016-05-25

2016-05-25

2016-06-04

2016-06-04

2016-06-14

2016-07-14 32MBR

12

7288,00

10 Hamburg

4260 Air

1

52,60

0 Frankfurt

CAIRO

4262 Air

1

92,00

0 Frankfurt

CAIRO

3536 Air

1

380,00

3 Frankfurt

CAIRO

4165 Sea

2

4011,00

16 Hamburg

ALEXANDRIA

4146 Sea

8

6890,00

84 Hamburg

ALEXANDRIA

CAP HARRIETT #SGL172945

2016-05-30

2016-05-25

2016-06-04

2016-06-04

2016-07-14 00C

4164 Sea

18

14489,21

38 Hamburg

ALEXANDRIA

CAP JERVIS #SEJJSGL182 075

2016-05-31

2016-05-31

2016-06-11

2016-06-11

2016-07-14 00UBA; 31MB ; 32BJT; 41C ; 41MB ; 41MK ; 42C ; 42MB


4161 Sea

6

11220,00

54 Hamburg

ALEXANDRIA

4252 Air

16

2604,20

20 Düsseldorf

CAIRO

4232 Air

17

6958,93

23 Düsseldorf

CAIRO

4266 Air

3

876,50

3 Frankfurt

CAIRO

4175 Sea

1

4533,31

38 Hamburg

ALEXANDRIA

4180 Sea

3

24719,00

212 Hamburg

ALEXANDRIA

3533 Air

4

15,54

0 Frankfurt

CAIRO

3531 Air

3

7,20

0 Frankfurt

CAIRO

3532 Air

11

162,98

1 Frankfurt

CAIRO

4130 Sea

50

77655,00

406 Koper

ALEXANDRIA

4166 Sea

4

37042,90

308 Hamburg

ALEXANDRIA

3528 Air

1

79,00

0 Frankfurt

CAIRO

3538 Air

1

86,00

0 Frankfurt

CAIRO

4196 Air

2

520,00

1 Roma

CAIRO

4157 Sea

8

11248,68

50 Hamburg

ALEXANDRIA

4145 Sea

12

120644,00

925 Hamburg

ALEXANDRIA

4192 Sea

3

11440,00

115 Antwerpen

ALEXANDRIA

4141 Sea

8

2610,00

14 Hamburg

ALEXANDRIA

3518 Sea

2

1060,00

3 Hamburg

ALEXANDRIA

4160 Sea

9

85394,80

623 Hamburg

ALEXANDRIA

4215 Air

7

111,60

1 Frankfurt

CAIRO

CAP JERVIS #SEJJSGL182 079 MS540/23 MS541/24 #07792956194 MS540/21 MS541/22 #07792956135 MS6051/02 MS541/03 #07792965795 CAP HARRIETT #SEJJSGL174 147

2016-05-31

2016-05-31

2016-06-11

2016-06-11

2016-06-21

2016-07-14 00ABA

2016-06-23

2016-06-23

2016-06-24

2016-06-24

2016-06-29

2016-07-14 00BZK; 00C ; 42C ; 99UBA

2016-06-21

2016-06-21

2016-06-22

2016-06-22

2016-06-27

2016-07-16 00; 00BZK; 31MB ; 32MB ; 41MK ; 42C ; 42MB

2016-07-02

2016-07-02

2016-07-03

2016-07-03

2016-07-08

2016-07-16 00EKH; 22MB ; 22MK

2016-05-25

2016-05-24

2016-06-04

2016-06-04

2016-06-14

2016-07-17 30UBA

CAP JERVIS #SGL186691 LH104/18 LH586/18 #02052165492 LH8290/19 #02052165503 KL8350/26 KL553/27 #07429873874 MSC ALTAMIRA #MSCURV748 422 CAP HARRIETT #SGL176267

2016-06-01

2016-06-01

2016-06-11

2016-06-11

2016-06-21

2016-07-17 00BZK; 00EKH; 30EKH

2016-06-14

2016-06-18

2016-06-18

2016-06-18

2016-06-23

2016-07-17 31MKA

2016-06-19

2016-06-20

2016-06-19

2016-06-19

2016-06-24

2016-07-17 00MB

2016-06-28

2016-06-28

2016-06-30

2016-06-30

2016-07-05

2016-07-17 11MB

2016-05-13

2016-06-01

2016-06-18

2016-06-18

2016-05-26

2016-05-25

2016-06-04

2016-06-04

2016-06-14

2016-07-18 41MB ; 42MB

KL8350/16 KL553/17 KL8354/28 MP8940/30 #07429873896 QR110/28 QR1301/01 #15799198304 MSC AZOV #MSCURV778 320 RIO DE LA PLATA #SGL163026 NORTHERN MONUMENT #MSCURV793 105 CAP HARRIETT

2016-06-17

2016-06-17

2016-06-18

2016-06-18

2016-06-23

2016-07-18 31MPR

2016-06-28

2016-06-28

2016-06-30

2016-06-30

2016-07-05

2016-07-18 41BAT

2016-06-28

2016-06-28

2016-07-01

2016-07-01

2016-07-06

2016-07-18 00ABA

2016-06-11

2016-06-13

2016-06-25

2016-06-25

2016-07-07

2016-07-19 32MKA

2016-05-19

2016-05-18

2016-05-29

2016-05-28

2016-06-08

2016-07-19 31MPB; 32MPB

2016-06-11

2016-06-13

2016-06-25

2016-06-25

2016-07-05

2016-07-19 00MB

CAP JERVIS #SGL172000 CAP JERVIS #SGL186273 KL8366/07 KL0553/08 #07429873922

2016-05-31

2016-05-31

2016-06-11

2016-06-11

2016-06-21

2016-07-20 31MBL; 32MBL

2016-06-01

2016-06-01

2016-06-11

2016-06-11

2016-06-21

2016-07-20 00BZK; 20UEN; 41MB ; 42MB

2016-07-08

2016-07-10

2016-07-12

2016-07-12

2016-07-17

2016-07-20 00C ; 31C ; 32C ; 41C ; 42C

2016-05-20

2016-07-18 41BAT; 42BAT

2016-05-31

2016-07-20 00ABA


4279 Air

2

134,30

1 Frankfurt

CAIRO

4268 Air

1

378,50

1 Shanghai

CAIRO

3530 Air

3

36,00

0 Frankfurt

CAIRO

4142 Sea

5

1853,00

4 Hamburg

ALEXANDRIA

3526 Sea

6

3240,00

6 Hamburg

ALEXANDRIA

4153 Sea

22

168481,00

1836 Hamburg

ALEXANDRIA

4205 Sea

13

11344,09

39 Hamburg

ALEXANDRIA

3529 Sea

10

7440,00

16 Hamburg

ALEXANDRIA

4296 Air

1

38,00

0 Frankfurt

CAIRO

4304 Air

3

239,10

1 Frankfurt

CAIRO

4182 Sea

44

174124,00

852 Hamburg

4179 Sea

14

66736,58

4190 Sea

1

256,00

1 Hamburg

4234 Air

8

11259,68

53 Frankfurt

31

255230,00

4251 Air

2

1086,00

1 Shanghai

CAIRO

4282 Air

2

63,00

0 Frankfurt

CAIRO

3502 Sea

1

270,00

4154 Sea

2

15150,00

115 Hamburg

ALEXANDRIA

4206 Sea

3

19852,61

192 Hamburg

ALEXANDRIA

4265 Air

1

56,00

0 Frankfurt

CAIRO

2916 Air

1

65,00

0 Frankfurt

CAIRO

4295 Air

3

1174,72

5 Frankfurt

CAIRO

2914 Air

2

113,00

0 Frankfurt

CAIRO

4199 Sea

ALEXANDRIA

323 Laem Chabang ALEXANDRIA

4321 Hamriya Port

ALEXANDRIA CAIRO

DAMIETTA

1 Shanghai Port ALEXANDRIA

MS6051/06 MS541/08 #07792966123 EK9889/10 #17666379972 KL8440/01 KL553/03 #0742987900 RIO BRAVO #SGL159426 RIO BRAVO #SGL191512 RIO BRAVO #SGL218974 RIO BLANCO #SGL223593 RIO BLANCO #SGL237251 LH7181/22 LH8290/24 MS4541/19 MS541/20 #07792971340 NORTHERN MONUMENT #MSCUKG519 974 BOX HONG KONG #MSCUWT905 616 MSC AZOV #MSCURV779 112 KL8358/21 MP8940/23 #07429873852 MATSUSAKA #HAMDAM01 EK9873 / 01 #17666379950 MS6051/07 MS541/08 #07792966112 CHONG MING #CPJQCM13S HAALY03 MAPLE INGRID #010 RIO BLANCO #SGL218691 MS540/24 MS541/26 #07792956242 MS6051/25 MS541/26 #07792956253 KL8440/15 MP8910/18 MS6051 / MS541 #07792956091

2016-07-06

2016-07-06

2016-07-08

2016-07-08

2016-07-13

2016-07-20 00C

2016-07-10

2016-07-10

2016-07-11

2016-07-11

2016-07-16

2016-07-20 42MKA

2016-07-06

2016-07-06

2016-07-09

2016-07-09

2016-07-14

2016-07-20 22MK

2016-06-08

2016-06-08

2016-06-18

2016-06-18

2016-06-28

2016-07-21 00ABA

2016-06-08

2016-06-08

2016-06-18

2016-06-18

2016-06-28

2016-07-21 31BTA; 32BTA

2016-06-14

2016-06-15

2016-06-25

2016-06-25

2016-07-05

2016-07-21 31MBL; 32MBL

2016-06-15

2016-06-15

2016-06-25

2016-06-25

2016-07-05

2016-06-15

2016-06-15

2016-06-25

2016-06-25

2016-07-05

2016-07-21 00C ; 31MB ; 32MB ; 41MB ; 42MB 2016-07-21 10URA

2016-07-13

2016-07-21

2016-07-21 00ABA

2016-07-19

2016-07-19

2016-07-20

2016-07-20

2016-07-25

2016-07-21 00MB

2016-06-11

2016-06-13

2016-06-27

2016-06-27

2016-07-07

2016-07-21 00C ; 00EKH; 00UBA; 20EKH; 30EKH; 41MB

2016-06-07

2016-06-07

2016-07-05

2016-07-05

2016-07-14

2016-07-22 31MBR

2016-06-08

2016-06-08

2016-06-25

2016-06-25

2016-07-05

2016-07-22 10URA

2016-06-15

2016-06-21

2016-06-23

2016-06-23

2016-06-28

2016-07-22 31MKA

2016-06-20

2016-06-21

2016-07-03

2016-07-03

2016-07-13

2016-07-22 31MBR

2016-07-04

2016-07-04

2016-07-06

2016-07-06

2016-07-11

2016-07-22 00

2016-07-07

2016-07-07

2016-07-08

2016-07-08

2016-07-13

2016-07-22 00C

2016-05-17

2016-05-17

2016-06-18

2016-06-20

2016-06-28

2016-07-25 31BBT

2016-06-01

2016-06-03

2016-06-15

2016-06-15

2016-06-26

2016-07-25 31MBL; 32MBL

2016-06-15

2016-06-15

2016-06-25

2016-06-25

2016-07-05

2016-07-25 31MB ; 32MB

2016-06-24

2016-06-24

2016-06-26

2016-06-24

2016-07-01

2016-07-25 00MK

2016-06-25

2016-06-25

2016-06-26

2016-06-26

2016-07-01

2016-07-25 00MB

2016-07-15

2016-07-15

2016-07-18

2016-07-18

2016-07-23

2016-07-25 00; 22MB ; 32MB

2016-06-08

2016-06-08

2016-06-10

2016-06-10

2016-06-15

2016-07-26 00MB


4216 Sea

36

11832,00

41 Hamburg

ALEXANDRIA

4229 Sea

1

410,00

2 Hamburg

ALEXANDRIA

4264 Air

6

810,00

4 Frankfurt

CAIRO

4290 Air

3

355,00

3 Frankfurt

CAIRO

4291 Air

1

480,00

1 Frankfurt

CAIRO

4172 Sea

9

118000,00

4211 Sea

13

20411,89

4207 Sea

2

18759,93

154 Hamburg

ALEXANDRIA

4200 Sea

8

8883,00

50 Hamburg

ALEXANDRIA

4227 Sea

38

219086,00

995 Antwerpen

ALEXANDRIA

2

77,00

4167 Sea

111

60095,94

321 Ho Chi Minh

ALEXANDRIA

4220 Sea

4

48342,60

345 Hamburg

ALEXANDRIA

4289 Air

5

400,00

1 Frankfurt

CAIRO

4071 Sea

4

1020,00

4 Shanghai

ALEXANDRIA

4117 Sea

15

430443,00

955 Antwerpen

ALEXANDRIA

4193 Sea

18

42012,00

260 Hamburg

ALEXANDRIA

4235 Sea

13

7938,82

4185 Sea

88

118410,00

244 Shanghai

ALEXANDRIA

4169 Sea

2

773,00

4 Hamburg

ALEXANDRIA

4224 Sea

2

6600,00

43 Antwerpen

ALEXANDRIA

4194 Sea

2

18429,00

157 Hamburg

ALEXANDRIA

4218 Sea

48

75340,00

398 Hamburg

ALEXANDRIA

4302 Air

1260 Ho Chi Minh Port 43 Hamburg

1 Helsinki

13 Genua

ALEXANDRIA ALEXANDRIA

CAIRO

ALEXANDRIA

RIO BLANCO #SEJJSGL225 395 RIO MADEIRA #SEJJSGL293 271 MS6051/02 MS541/03 #07792956264 MS541/10 #07792966156 MS541/10 #07792966160 ABB FELINA #ALEX-001 RIO BRAVO #SGL221911 RIO BLANCO #SGL219153 MSC AGADIR #MSCUKG545 508 THORCO ARVIAT #019 QR2015/15 QR1301/19 #15700117121 HAMMONIA INTERNUM #604640675 EIO DE LA PLATA #SEJJSGL228 111 MS540/14 MS541/15 #07792966204 HANJIN TABUL #YMLUM2313 26808 MAPLE INGRID #006 MSC AZOZ #MSCURV789 624 JOLLY CHRISTALLO #G0699261 GUNDE MAERSK #MSCUYR373 914 SAFMARINE NUBA #SGL224971 THORCO ARVIAT #020 THORCO ARVIAT #022 RIO DE LA PLANTA #SEJJSGL227 032

2016-06-15

2016-06-14

2016-06-25

2016-06-25

2016-07-05

2016-07-26 00C ; 10C ; 30C ; 31C ; 32C ; 41C ; 42C

2016-06-29

2016-06-29

2016-07-09

2016-07-09

2016-07-19

2016-07-26 22MB

2016-07-01

2016-07-06

2016-07-03

2016-07-03

2016-07-08

2016-07-26 00

2016-07-08

2016-07-08

2016-07-10

2016-07-10

2016-07-15

2016-07-26 00

2016-07-08

2016-07-08

2016-07-10

2016-07-10

2016-07-15

2016-07-26 00

2016-06-02

2016-06-03

2016-07-01

2016-07-01

2016-07-11

2016-07-27 31MBR

2016-06-15

2016-06-14

2016-06-25

2016-06-25

2016-07-05

2016-07-27 00BZK

2016-06-15

2016-06-15

2016-06-25

2016-06-25

2016-07-05

2016-07-27 32MB

2016-06-15

2016-06-15

2016-07-02

2016-07-02

2016-07-12

2016-07-27 41MBR

2016-06-22

2016-06-23

2016-07-05

2016-07-03

2016-07-15

2016-07-27 00UEN

2016-07-15

2016-07-15

2016-07-19

2016-07-19

2016-07-24

2016-07-27 00ABA

2016-06-06

2016-06-06

2016-07-04

2016-07-04

2016-07-14

2016-07-28 31MBR

2016-06-22

2016-06-23

2016-07-02

2016-07-02

2016-07-12

2016-07-28 30UEN; 40UEN

2016-07-12

2016-07-14

2016-07-15

2016-07-15

2016-07-20

2016-07-28 00MB

2016-05-13

2016-05-11

2016-06-06

2016-06-13

2016-06-16

2016-07-30 31MBL; 32MBL; 41MBL; 42MBL

2016-06-03

2016-06-03

2016-06-15

2016-06-15

2016-06-25

2016-07-30 00BZK

2016-06-08

2016-06-08

2016-06-25

2016-06-25

2016-07-05

2016-07-30 10URA; 31MBV; 31MPR

2016-07-05

2016-07-05

2016-07-10

2016-07-11

2016-07-20

2016-07-30 10URA

2016-06-01

2016-06-01

2016-07-01

2016-07-01

2016-07-11

2016-07-31 10URA

2016-06-13

2016-06-06

2016-06-18

2016-06-19

2016-06-28

2016-07-31 00C

2016-06-15

2016-06-23

2016-07-05

2016-07-05

2016-07-15

2016-07-31 31C ; 32C

2016-06-20

2016-06-23

2016-07-05

2016-07-04

2016-07-15

2016-07-31 00EKH

2016-06-22

2016-06-23

2016-07-02

2016-07-02

2016-07-12

2016-07-31 31BAT; 32BAT


4273 Air

9

143,80

1 Frankfurt

CAIRO

4131 Sea

6

128812,04

230 Hamburg

ALEXANDRIA

4219 Sea

8

157500,80

569 Hamburg

ALEXANDRIA

4239 Sea

65

32500,00

422 Hamburg

ALEXANDRIA

4299 Air

7

154,90

1 Frankfurt

CAIRO

3500 Sea

4

878,00

7 Shanghai

ALEXANDRIA

4307 Air

1

268,00

2 Frankfurt

CAIRO

4181 Sea

5

58700,00

4188 Sea

34

171453,16

4201 Sea

35

4151 Sea

117

4152 Sea 4254 Sea

166 Antwerpen

ALEXANDRIA

474 Mumbai

ALEXANDRIA

76810,00

301 Hamburg

ALEXANDRIA

53100,00

818 Hamburg

ALEXANDRIA

35

76810,00

301 Hamburg

ALEXANDRIA

389 Antwerpen

ALEXANDRIA

10

97000,00

2918 Air

6

216,80

1 Frankfurt

CAIRO

4305 Air

2

404,00

1 Frankfurt

CAIRO

4308 Air

1

236,00

2 Frankfurt

CAIRO

4301 Air

3

47,50

0 Frankfurt

CAIRO

4228 Sea

15

67797,98

325 Laem Chabang ALEXANDRIA

4222 Sea

1

29900,00

140 Antwerpen

ALEXANDRIA

4217 Sea

7

8483,00

12 Hamburg

ALEXANDRIA

4274 Sea

25

13426,00

39 Hamburg

ALEXANDRIA

4209 Sea

4

25985,00

160 Hamburg

ALEXANDRIA

4230 Sea

14

14528,21

70 Hamburg

ALEXANDRIA

MS4541/21 MS541/22 #07792971373 MSC LUCIANA #MSCUKG401 801 THORCO ARVIAT #018 MSC ATHOS #MSCUKG595 438 MS6051/18 MS541/20 #07792971325 HANJIN GREECE #YMLUM2313 40805 MS4541/19 MS541/20 #07792971351 MSC LORETTA #MSCURV758 660 ABB FELINA #MUM-ALE001 CAP JERVIS #SGL219131 RIO BRAVO #569790471 RIO DE LA PLATA #SGL219112 THORCO ASIA #017 MS4541/19 MS541/20 #07792971336 MS6051/22 MS541/23 #07792971406 MS4541/21 MS541/22 #07792971362 MS6051/21 MS541/22 #07792971395 BOX HONG KONG #MSCUWT916 092 THORCO ARVIAT #017 MSC AGADIR #MSCURV809 000 RIO BRAVO #SGL341266 MSC SEATTLE #MSCUKG549 500 RIO MADEIRA #SGL269994

2016-07-21

2016-07-21

2016-07-22

2016-07-22

2016-07-27

2016-07-31 00C ; 30C ; 40C

2016-05-12

2016-05-12

2016-05-28

2016-05-28

2016-06-07

2016-08-01 41BAT; 42BAT

2016-06-22

2016-06-23

2016-07-05

2016-07-05

2016-07-15

2016-08-01 30UEN; 40UEN

2016-06-29

2016-06-29

2016-07-16

2016-07-16

2016-07-26

2016-08-01 31BAA; 32BAA

2016-07-18

2016-07-18

2016-07-20

2016-07-20

2016-07-25

2016-08-01 00MB ; 00MK

2016-06-15

2016-06-14

2016-07-11

2016-07-11

2016-07-25

2016-08-01 31MBR; 32MBR; 41MBR; 42MBR

2016-07-19

2016-07-19

2016-07-20

2016-07-20

2016-07-25

2016-08-01 00MB

2016-05-29

2016-05-29

2016-06-12

2016-06-12

2016-06-22

2016-08-02 00

2016-06-18

2016-06-18

2016-06-30

2016-06-30

2016-07-10

2016-08-02 10URA

2016-07-06

2016-07-06

2016-07-16

2016-07-16

2016-07-26

2016-08-02 22MBR

2016-06-08

2016-06-08

2016-06-18

2016-06-18

2016-06-28

2016-08-03 41XKA

2016-06-22

2016-06-23

2016-07-02

2016-07-02

2016-07-12

2016-08-03 31MBR

2016-07-04

2016-07-05

2016-07-16

2016-07-17

2016-07-26

2016-08-03 11UHA

2016-07-19

2016-07-19

2016-07-20

2016-07-20

2016-07-25

2016-08-03 00MB

2016-07-22

2016-07-22

2016-07-23

2016-07-23

2016-07-28

2016-08-03 41MK ; 42C

2016-07-21

2016-07-21

2016-07-22

2016-07-23

2016-07-27

2016-08-03 00EKH

2016-07-21

2016-07-21

2016-07-22

2016-07-22

2016-07-27

2016-08-03 00; 22MK

2016-06-14

2016-06-14

2016-07-12

2016-07-12

2016-07-22

2016-08-03 22MBR

2016-06-22

2016-06-23

2016-07-05

2016-07-05

2016-07-15

2016-08-03 00EKH

2016-06-15

2016-06-15

2016-07-02

2016-07-02

2016-07-12

2016-08-04 00ABA

2016-07-13

2016-07-13

2016-07-23

2016-07-23

2016-08-02

2016-08-04 31MBR

2016-06-18

2016-06-19

2016-07-02

2016-07-02

2016-07-12

2016-08-06 00EKH

2016-06-29

2016-06-29

2016-07-09

2016-07-09

2016-07-19

2016-08-06 11MB ; 20EKH; 31MB ; 41MB


4114 Sea

4

480,00

1 Hamburg

ALEXANDRIA

4247 Sea

3

9450,00

65 Antwerpen

ALEXANDRIA

4241 Sea

6

4400,00

38 Hamburg

ALEXANDRIA

3534 Sea

2

400,00

4238 Sea

52

20600,00

396 Hamburg

ALEXANDRIA

4240 Sea

6

127702,04

230 Hamburg

ALEXANDRIA

4113 Sea

4

18707,60

243 Rijeka

ALEXANDRIA

4272 Sea

2

22615,00

125 Antwerpen

ALEXANDRIA

4208 Sea

2

19017,14

154 Abu Dhabi

DAMIETTA

3524 Sea

4

243,20

1 Hamburg

ALEXANDRIA

4139 Sea

8

11404,00

26 Hamburg

ALEXANDRIA

4256 Sea

4

25985,00

160 Antwerpen

ALEXANDRIA

4255 Sea

3

15424,00

139 Antwerpen

ALEXANDRIA

4246 Sea

13

9676,90

4280 Sea 4309 Air

1 6

4315 Air

1 Antwerpen

ALEXANDRIA

70 Jebel Ali Port

ALEXANDRIA

10105,00 2386,00

86 Hamburg 14 Frankfurt

ALEXANDRIA CAIRO

2

65,50

0 Frankfurt

CAIRO

3542 Air

5

50,23

0 Frankfurt

CAIRO

4311 Air

1

60,00

0 Jebel Ali

CAIRO

4198 Sea

13

9676,90

4191 Sea

14

29980,00

4236 Sea

1

1872,00

3535 Sea

4

4267 Sea

2

70 Jebel Ali Port

DAMIETTA

59 Izmir

ALEXANDRIA

6 Mumbai

ALEXANDRIA

243,20

1 Hamburg

ALEXANDRIA

1620,00

4 Hamburg

ALEXANDRIA

MSC PINA #MSCUKG579 911 MSC MELISSA #MSCUKG586 643 MSC ATHOS #MSCUKG596 691 MSC FLAMINIA #MSCURV877 593 CAP JERVIS #SGL275611 RIO DE LA PLATA #SGL255555 MAERSK ALTAIR #TBA MSC FLAMINIA #MSCURV878 476 MAERSK TAIKUNG #956822984 RIO BLANCO #569791149 MSC ATHOS #MSCUKG597 665 THORCO ASIA #019 THORCO ASIA #018 CHARLOTTE SCHULTE #957085169 RIO BRAVO # MA4541/28 MS541/29 #07792971465 MS6051/29 MS541/31 #07792971480 KL8350/04 KL 553/05 #07429873992 MS913/29 #07796060532 CARDIFF #956858176 MARTHA A #ARKIZM0000 100237 ABB FELINA #MUM-ALE003 MSC ARBATAX #MSCUKG599 679

2016-06-22

2016-06-22

2016-07-09

2016-07-09

2016-07-19

2016-08-06 31CYE; 32CYE; 41CYE; 42CYE

2016-06-25

2016-06-26

2016-07-09

2016-07-09

2016-07-19

2016-08-06 00EKH; 30EKH; 40EKH

2016-06-29

2016-06-29

2016-07-16

2016-07-16

2016-07-26

2016-08-07 21MBR; 22MBR

2016-07-09

2016-07-10

2016-07-24

2016-07-25

2016-08-03

2016-08-07 00UEN

2016-07-06

2016-07-06

2016-07-16

2016-07-16

2016-07-26

2016-08-07 32BAA

2016-06-23

2016-06-23

2016-07-02

2016-07-02

2016-07-12

2016-08-07 31BAT; 32BAT

2016-06-10

2016-06-18

2016-07-07

2016-07-07

2016-07-17

2016-08-08 31CYE; 32CYE; 41CYE; 42CYE

2016-07-10

2016-07-10

2016-07-23

2016-07-25

2016-08-02

2016-08-08 00EKH

2016-06-08

2016-06-08

2016-06-23

2016-06-23

2016-07-03

2016-08-09 31MB

2016-06-15

2016-06-15

2016-06-25

2016-06-25

2016-07-05

2016-08-10 41XKA

2016-06-29

2016-06-29

2016-07-16

2016-07-16

2016-07-26

2016-08-10 31CYE; 32CYE; 41CYE; 42CYE

2016-07-04

2016-07-05

2016-07-16

2016-07-17

2016-07-26

2016-08-10 20EKH

2016-07-04

2016-07-05

2016-07-16

2016-07-17

2016-07-26

2016-08-10 00UEN

2016-07-06

2016-07-04

2016-07-14

2016-07-14

2016-07-24

2016-08-10 22MBR

2016-07-13 2016-07-28

2016-07-13 2016-07-28

2016-07-23 2016-07-29

2016-07-23 2016-07-29

2016-08-02 2016-08-03

2016-08-10 20EKH 2016-08-10 00; 00C ; 21MBA; 22MBA; 40EKH

2016-07-29

2016-07-29

2016-07-31

2016-07-31

2016-08-05

2016-08-10 00C ; 42MB

2016-08-04

2016-08-05

2016-08-06

2016-08-06

2016-08-11

2016-08-10 22MK

2016-07-29

2016-07-29

2016-07-29

2016-07-29

2016-08-03

2016-08-10 32MBR

2016-05-13

2016-06-13

2016-06-23

2016-06-23

2016-07-03

2016-08-10 31MBR

2016-06-12

2016-06-12

2016-06-20

2016-06-20

2016-06-30

2016-08-11 10URA

2016-06-18

2016-06-18

2016-06-30

2016-06-30

2016-07-10

2016-08-11 10URA

2016-07-06

2016-07-06

2016-07-23

2016-07-25

2016-08-02

2016-08-11 31BAA; 32BAA

CAP JERVIS #SGL319341

2016-07-06

2016-07-06

2016-07-16

2016-07-16

2016-07-26

2016-08-11 10URA; 22MK


3540 Air

2

800,00

3 Frankfurt

CAIRO

KL8440/25 KL553/27 #07429873970 MARTHA A #TR-YAR-ALX15283 RIO BLANCO #SGL345081 KL8352/04 KL553/05 #07429873981 MS4541 MS541 #07792974781 MSC ARBATAX #MSCUKG611 052

2016-07-25

2016-07-25

2016-07-27

2016-07-28

2016-08-01

2016-08-11 20UMA

4233 Sea

6

1650,00

7 Istanbul

ALEXANDRIA

2016-07-05

2016-07-05

2016-07-11

2016-07-11

2016-07-21

2016-08-12 00BZK

4278 Sea

28

17747,70

36 Hamburg

ALEXANDRIA

2016-07-20

2016-07-20

2016-07-30

2016-07-30

2016-08-09

2016-08-14 00ABK; 21MK ; 22MK ; 40EKH

9001 Air

1

161,50

1 Frankfurt

CAIRO

2016-08-04

2016-08-05

2016-08-06

2016-08-06

2016-08-11

2016-08-14 00ABA

4319 Air

3

2840,72

7 Frankfurt

CAIRO

2016-08-04

2016-08-04

2016-08-06

2016-08-06

2016-08-11

2016-08-14 00BZK; 00EKH; 22MK

4261 Sea

10

3752,00

21 Hamburg

ALEXANDRIA

2016-07-06

2016-07-06

2016-07-23

2016-07-25

2016-08-02

2016-08-14 00ABA

4253 Sea

9

3134,13

29 Hamburg

ALEXANDRIA

MSC ARBATAX #MSCURV852 752

2016-07-06

2016-07-06

2016-07-23

2016-07-25

2016-08-02

2016-08-14 00C ; 10URA; 31C ; 32C

4244 Sea

11

13242,00

66 Hamburg

ALEXANDRIA

2016-07-13

2016-07-13

2016-07-31

2016-07-31

2016-08-10

2016-08-14 22MBR; 32MBR

851829,19

11467 Shanghai

ALEXANDRIA

2016-05-17

2016-05-17

2016-06-20

2016-06-18

2016-06-30

2016-08-15 31MBL; 32MBL; 41MBL; 42MBL

2

57,00

0 Frankfurt

CAIRO

2016-08-05

2016-08-09

2016-08-10

2016-08-10

2016-08-15

2016-08-15 00MB

4340 Air

1

93,00

1 Kรถln

CAIRO

2016-08-05

2016-08-06

2016-08-06

2016-08-05

2016-08-11

2016-08-15 32MBR

4327 Air

5

599,00

3 Frankfurt

CAIRO

2016-08-09

2016-08-09

2016-08-10

2016-08-10

2016-08-15

2016-08-15 00BZK; 00C ; 21C ; 42C

4277 Sea

19

26294,00

2016-07-16

2016-07-16

2016-08-02

2016-08-02

2016-08-12

2016-08-15 10URA

4212 Sea

15

29557,00

99 Hamburg

ALEXANDRIA

2016-07-13

2016-07-13

2016-07-31

2016-07-31

2016-08-10

2016-08-15 22MK

4183 Sea

2

30132,00

159 HuangPu

ALEXANDRIA

2016-06-29

2016-06-28

2016-08-03

2016-08-03

2016-08-13

2016-08-16 21MBR; 22MBR

4293 Air

1

38,00

0 Frankfurt

4297 Sea

2

12600,00

86 Hamburg

4250 Sea

42

200209,73

4263 Sea

7

45263,20

4269 Sea

15

9450,00

4292 Sea

85

61220,00

131 Hamburg

ALEXANDRIA

4281 Sea

14

26342,00

155 Hamburg

ALEXANDRIA

MSC CATERINA #MSCUKG584 689 CHONG MING #CPJQCM13S HAALY01 MS6051 MS541 #07792976925 MS541 #07792976903 MS4541 MS541 #07792976936 AL MANAMAH # MSC CATERINA #MSCURV873 832 SMART LISA #SL1602HPAL X02 LH7181/22 LH8290/24 RIO DE LA PLATA #SGL346649 BOX HONG KONG #MSCUWT937 189 MSC LORETTA #MSCUKG617 356 VENTO DI GRECALE #620DGEBALE 837/01 VENTO DI GRECALE #620DGEBALE 843/01 RIO BLANCO #SGL343885

4075 Sea

110

4337 Air

267 Mumbai

ALEXANDRIA

CAIRO ALEXANDRIA

970 Laem Chabang ALEXANDRIA

134 Antwerpen 38 Yilport

ALEXANDRIA ALEXANDRIA

2016-08-08

2016-07-16

2016-08-16 00ABA

2016-07-27

2016-07-26

2016-08-06

2016-08-06

2016-08-16

2016-08-16 21BAC; 22BAC

2016-07-01

2016-06-28

2016-07-30

2016-07-29

2016-08-09

2016-08-17 11MBR; 12MBR; 21MBR

2016-07-03

2016-07-03

2016-07-17

2016-07-17

2016-07-27

2016-08-17 00; 00C ; 21MB ; 22MB

2016-07-26

2016-07-26

2016-08-02

2016-08-01

2016-08-12

2016-08-17 11SGY; 21SGY; 31SGJ; 31SGY; 41SGJ; 41SGY

2016-07-26

2016-07-26

2016-08-02

2016-08-01

2016-08-12

2016-08-17 31SGC; 41SGA; 41SGC

2016-07-20

2016-07-20

2016-07-30

2016-07-30

2016-08-09

2016-08-17 20EKH; 99UBA


4214 Sea

111

60095,94

321 Ho Chi Minh

ALEXANDRIA

4116 Sea

16

56640,00

211 Chennai

ALEXANDRIA

4270 Sea

1

16537,00

86 Hamburg

ALEXANDRIA

4184 Sea

6

135800,00

928 HuangPu

ALEXANDRIA

4248 Sea

12

6418,00

29 Hamburg

ALEXANDRIA

4226 Sea

27

43097,92

118 Mumbai

ALEXANDRIA

4203 Sea

17

59340,00

218 Chennai

ALEXANDRIA

4221 Sea

2

32700,00

4237 Air

1

353,00

1 Frankfurt

CAIRO

2919 Air

4

32,10

0 Frankfurt

CAIRO

4343 Air

1

258,00

0 Frankfurt

CAIRO

4336 Air

10

722,00

5 Frankfurt

CAIRO

4287 Sea

13

9676,90

3537 Air 4275 Sea

1 18

271,65 23160,00

4286 Sea

11

4249 Sea

35

2917 Sea

89 Antwerpen

ALEXANDRIA

70 Jebel Ali Port

DAMIETTA

1 Frankfurt 67 Genua

Cairo ALEXANDRIA

12502,00

66 Hamburg

ALEXANDRIA

76810,00

301 Hamburg

ALEXANDRIA

3

21688,00

117 Hamburg

ALEXANDRIA

4285 Sea

65

217064,86

592 Mumbai

DAMIETTA

4294 Sea

15

19360,00

4271 Sea 4245 Sea

1 31

29900,00 255230,00

4312 Sea

1

6895,00

4187 Sea

8

135943,44

60 Hamburg

140 Antwerpen 4321 Hamriya Port 77 Hamburg

ALEXANDRIA

ALEXANDRIA DAMIETTA ALEXANDRIA

699 Laem Chabang ALEXANDRIA

AEGEAN EXPRESS #SSPHHCM00 202697 MAERSK GATESHEAD #956452068/ 9526452073 RIO DE LA PLATA #SGL341143 SMART LISA #SL1602HPAL X01 RIO BLANCO #SGL345673 ABB FELINA #MUM-ALE002 OCEAN PROBE #MAEU604662 329 + 6046 NORTHERN MONUMENT #MSCURV808 994 MS6051 MS541 #07792975746 KL8350 KL0553 #07429874003 MS6051 MS541 #07792976914 MS6051 MS541 #07792976940 MAERSK GANGES #957252553 LH8296/22 JOLLY PERLA #TO FOLLOW RIO MADEIRA #SGL343883 RIO MADEIRA #SGL287131 RIO BRAVO #SEJJSGL342 821 BBC STEINHOEFT #MUMDAM001 MSC ALTAMIRA #MSCURV934 691 ANNA #019 BBC STEINHOEFT #HAMDAM01 MSC ATHENS #MSCUKG713 478 WESTERN CARMEN #WC1601LCB ALX01

2016-07-05

2016-06-27

2016-07-31

2016-07-29

2016-08-10

2016-08-17 22MBR

2016-05-02

2016-05-02

2016-05-27

2016-05-27

2016-06-06

2016-08-18 41BAT; 42BAT

2016-07-27

2016-07-27

2016-08-06

2016-08-06

2016-08-16

2016-08-18 00UEN

2016-06-29

2016-06-28

2016-08-03

2016-08-03

2016-08-13

2016-08-18 21MBR; 22MBR

2016-07-20

2016-07-20

2016-07-30

2016-07-30

2016-08-09

2016-08-18 00ABA

2016-06-18

2016-06-18

2016-06-30

2016-06-30

2016-07-10

2016-08-19 10URA

2016-06-23

2016-06-22

2016-07-27

2016-07-26

2016-08-06

2016-08-19 31BAT; 32BAT; 42BAT

2016-06-11

2016-06-13

2016-06-25

2016-06-25

2016-07-05

2016-08-21 00

2016-08-03

2016-08-04

2016-08-06

2016-08-06

2016-08-11

2016-08-21 00

2016-08-06

2016-08-06

2016-08-09

2016-08-09

2016-08-14

2016-08-21 00MA ; 00MK

2016-08-09

2016-08-09

2016-08-10

2016-08-10

2016-08-15

2016-08-21 42MB

2016-08-09

2016-08-09

2016-08-10

2016-08-10

2016-08-15

2016-08-21 00; 00MB

2016-08-01

2016-08-01

2016-08-11

2016-08-11

2016-08-21

2016-08-21 21MBR

2016-06-15 2016-07-28

2016-06-21 2016-07-29

2016-06-21 2016-08-03

2016-06-22 2016-08-03

2016-08-13

2016-08-21 00ABA 2016-08-22 00ABA

2016-08-03

2016-08-03

2016-08-13

2016-08-13

2016-08-23

2016-08-23 21MBR; 31MBR

2016-08-03

2016-08-03

2016-08-13

2016-08-13

2016-08-23

2016-08-23 21MBR

2016-07-13

2016-07-13

2016-07-23

2016-07-24

2016-08-02

2016-08-25 00ABK

2016-07-15

2016-07-16

2016-07-29

2016-07-30

2016-08-08

2016-08-25 20URA

2016-07-27

2016-07-28

2016-08-13

2016-08-14

2016-08-23

2016-08-25 10URA; 20URA; 22MK

2016-07-27 2016-07-11

2016-07-27 2016-07-10

2016-08-16 2016-07-29

2016-08-16 2016-07-30

2016-08-26 2016-08-08

2016-08-25 20EKH 2016-08-26 22MBR

2016-08-03

2016-08-03

2016-08-20

2016-08-20

2016-08-30

2016-08-26 10URA

2016-07-24

2016-07-23

2016-08-19

2016-08-19

2016-08-29

2016-08-27 11MBR; 12MBR; 21MBR; 22MBR


9002 Sea

4

38816,00

158 Kallo

ULSAN

4213 Sea

9

118000,00

1260 Ho Chi Minh Port

ALEXANDRIA

4284 Sea

40

60265,94

ALEXANDRIA

4259 Air

2

178,00

209 Ho Chi Minh Port 1 Helsinki

4303 Air

1

322,00

4347 Air

1

2920 Air

CAIRO

2 Denver

CAIRO

22,00

0 Frankfurt

CAIRO

2

2555,00

12 Frankfurt

CAIRO

4359 Air

1

43,00

0 Frankfurt

CAIRO

4367 Air

1

33,00

0 Frankfurt

CAIRO

4338 Air

1

312,00

3 Frankfurt

CAIRO

4357 Air

5

943,30

6 Frankfurt

CAIRO

3547 Air

4

7,60

0 Frankfurt

CAIRO

4373 Air

3

82,40

0 Frankfurt

CAIRO

4314 Sea

13

7957,80

13 Genua

ALEXANDRIA

3541 Sea

9

6334,00

12 Hamburg

ALEXANDRIA

4306 Sea

2

3437,00

15 Hamburg

ALEXANDRIA

4310 Sea

12

9222,35

44 Hamburg

ALEXANDRIA

4323 Sea

15

32080,00

63 Izmir

ALEXANDRIA

4276 Sea

2

32345,00

142 Hamburg

ALEXANDRIA

3539 Sea

18

175,40

1 Hamburg

ALEXANDRIA

4300 Sea

2

8483,00

80 Antwerpen

ALEXANDRIA

MORNING LAURA #EUKOBEKR1 430135 WESTERN CARMEN #WC1601HCM ALX01 YM INVENTIVE # QR2015/01 QR1303/07 #15798004126 BA218 BA155 #12535356053 MS6051 MS541 #07792976984 KL8354 MP8910 #07449772892 MS6051 MS541 #07792979924 MS6051/18 MS541/19 #07792979946 MS6051/25 MS541/26 #07792976951 MS6051/23 MS541/24 #07792980064 KL8440/24 KL553/26 #07449772914 MS6051/23 MS541/24 #07792970075 MARGUERITE #623TGOAALE 203/01 MSC AGADIR #MSCURV976 015 MSC AGADIR #MSCURV955 621 RIO BRAVO #SGL352897 PIERRE A #ARKIZM0000 102812 STELLAR MAESTRO #016 RIO DE LA PLATA #SGL347159 / 57031110 STELLAR MAESTRO #007

2016-07-08

2016-07-07

2016-08-18

2016-08-18

2016-08-28

2016-08-28 11UHA

2016-06-27

2016-07-05

2016-08-19

2016-08-19

2016-08-29

2016-08-29 22MBR

2016-07-26

2016-07-26

2016-08-20

2016-08-18

2016-08-30

2016-08-31 21MBR

2016-07-01

2016-07-04

2016-07-07

2016-07-07

2016-07-12

2016-09-01 00ABA

2016-07-25

2016-07-25

2016-07-31

2016-07-31

2016-08-05

2016-09-01 42MB

2016-08-11

2016-08-15

2016-08-12

2016-08-15

2016-08-17

2016-09-01 00MB

2016-08-12

2016-08-12

2016-08-15

2016-08-15

2016-08-20

2016-09-01 00MB

2016-08-16

2016-08-16

2016-08-17

2016-08-17

2016-08-22

2016-09-01 00

2016-08-18

2016-08-18

2016-08-19

2016-08-19

2016-08-24

2016-09-01 00

2016-08-25

2016-08-25

2016-08-26

2016-08-26

2016-08-31

2016-09-01 00MB

2016-08-23

2016-08-23

2016-08-24

2016-08-24

2016-08-29

2016-09-01 00C ; 00EKH; 41MK ; 42C ; 99UBA

2016-08-24

2016-08-24

2016-08-26

2016-08-26

2016-08-31

2016-09-01 00MK

2016-08-23

2016-08-23

2016-08-24

2016-08-24

2016-08-29

2016-09-01 11MB ; 12MB ; 40EKH

2016-08-07

2016-08-06

2016-08-22

2016-08-21

2016-09-01

2016-09-03 20URA

2016-08-10

2016-08-10

2016-08-28

2016-08-28

2016-09-07

2016-09-03 20URA

2016-08-10

2016-08-10

2016-08-28

2016-08-28

2016-09-07

2016-09-03 11MBR

2016-08-17

2016-08-17

2016-08-27

2016-08-27

2016-09-06

2016-09-03 00ABK; 00C ; 10EKH; 22MK

2016-08-09

2016-08-11

2016-08-16

2016-08-14

2016-08-26

2016-09-04 20URA

2016-08-15

2016-08-17

2016-08-29

2016-08-29

2016-09-08

2016-09-07 41XKA

2016-07-27

2016-07-26

2016-08-27

2016-08-27

2016-09-06

2016-09-08 21MK ; 22MK

2016-08-15

2016-08-17

2016-08-29

2016-08-29

2016-08-09

2016-09-08 00UEN


4326 Sea

6

4292,00

21 Hamburg

ALEXANDRIA

4321 Sea

4

4400,00

31 Hamburg

ALEXANDRIA

4339 Sea 4344 Air

10 5

26516,00 1726,00

145 Izmir 5 Frankfurt

ALEXANDRIA CAIRO

4318 Sea

6

31752,90

231 Hamburg

ALEXANDRIA

4320 Sea

15

63058,75

190 Hamburg

ALEXANDRIA

4354 Sea

5

1675,13

18 Hamburg

ALEXANDRIA

4356 Sea

1

13080,00

77 Hamburg

ALEXANDRIA

4355 Sea

3

4515,00

30 Hamburg

ALEXANDRIA

4378 Air

1

24,10

0 Frankfurt

4329 Air

2

5716,00

4324 Sea

3

54990,00

4288 Sea

31

255230,00

4243 Sea

2

30552,00

159 HuangPu

ALEXANDRIA

4330 Sea

31

59510,20

229 Hamburg

ALEXANDRIA

4242 Sea

6

135800,00

928 HuangPu

ALEXANDRIA

4313 Sea

4

42539,00

189 Hamburg

ALEXANDRIA

4352 Air

1

8,00

4383 Air

1

15,00

4388 Air

2

253,00

4364 Air

2

9108,00

4404 Air

1

44,00

4408 Air

1

4414 Air

1

15 Istanbul 241 Antwerpen 4321 Hamriya Port

CAIRO CAIRO ALEXANDRIA DAMIETTA

0 Ho Chi Minh

CAIRO

0 Frankfurt

CAIRO

2 Düsseldorf

CAIRO

16 Manama

CAIRO

0 Düsseldorf

CAIRO

144,08

1 Frankfurt

CAIRO

31,00

0 Frankfurt

CAIRO

MSC PINA #MSCURV981 643 MSC PINA #MSCURV965 273 MARTHA A # MS4541 MS541 #07792979902 RIO BRAVO #SGL358441 MSC PINA #MSCUKG739 812 RIO BLANCO #SGL359321 RIO BLANCO #SGL359868 RIO BLANCO #SGL359418 MS786/28 #07792980086 LH8341 LH8290 #02052744753 STELLAR MAESTRO #017 INDUSTRIAL MAYA #HAM/DAM/E SS012 UNION DEMETER #UD1606HPAL X02 MSC ATHOS #MSCUKG768 027 UNION DEMETER #UD1606HPAL X01 MSC ATHOS #MSCURV973 269 EK0393 EK0929 #17665083336 MS6051/31 MS541/02 #07796189811 MS541/04 #07796189951 MS506 #07796182553 MS541/02 #07792975761 MS6051/08 MS541/09 #07796190124 MS798/09 #07792595274

2016-08-17

2016-08-17

2016-09-04

2016-09-04

2016-09-14

2016-09-08 21MB ; 22MB

2016-08-17

2016-08-17

2016-09-04

2016-09-04

2016-09-14

2016-09-08 11MBA; 12MBA; 21MBA; 22MBA

2016-08-14 2016-08-16

2016-08-20 2016-08-16

2016-08-26 2016-08-17

2016-08-25 2016-08-17

2016-09-05 2016-08-22

2016-09-09 10URA 2016-09-09 00; 22UBA; 32MKA; 42MKA; 99UBA

2016-08-17

2016-08-17

2016-08-27

2016-08-27

2016-09-06

2016-09-09 10URA

2016-08-17

2016-08-17

2016-09-04

2016-09-04

2016-09-14

2016-09-09 00; 21C ; 22C ; 22MK ; 42MB

2016-08-24

2016-08-23

2016-09-03

2016-09-03

2016-09-13

2016-09-09 20URA

2016-08-24

2016-08-23

2016-09-03

2016-09-03

2016-09-13

2016-09-09 10URA

2016-08-24

2016-08-24

2016-09-03

2016-09-03

2016-09-13

2016-09-09 10URA; 20URA

2016-08-31

2016-08-31

2016-09-02

2016-09-02

2016-09-07

2016-09-09 00BZK

2016-08-31

2016-09-01

2016-09-01

2016-09-04

2016-09-06

2016-09-09 41SGC

2016-08-15

2016-08-17

2016-08-29

2016-08-29

2016-09-08

2016-09-17 00XKA; 31XKA

2016-08-08

2016-08-09

2016-08-30

2016-08-30

2016-09-09

2016-09-19 21MBR

2016-08-10

2016-08-05

2016-09-02

2016-09-03

2016-09-12

2016-09-19 11MBR; 12MBR

2016-08-24

2016-08-24

2016-09-10

2016-09-10

2016-09-20

2016-09-19 10URA; 21C ; 21MK ; 21MKC; 22MB ; 22MBJ; 22MKC; 32MKC

2016-08-10

2016-08-05

2016-09-02

2016-09-03

2016-09-12

2016-09-20 11MBR; 12MBR

2016-08-24

2016-08-24

2016-09-10

2016-09-10

2016-09-20

2016-09-20 10EKH; 10URA

2016-08-13

2016-08-13

2016-08-13

2016-08-14

2016-08-18

2016-09-21 42MBR

2016-08-31

2016-08-31

2016-09-02

2016-09-02

2016-09-07

2016-09-21 00C

2016-09-04

2016-09-06

2016-09-04

2016-09-06

2016-09-09

2016-09-21 00C ; 42MB

2016-09-05

2016-09-05

2016-09-05

2016-09-06

2016-09-10

2016-09-21 00ABA

2016-09-06

2016-09-06

2016-09-07

2016-09-07

2016-09-12

2016-09-21 00UEN

2016-09-08

2016-09-08

2016-09-09

2016-09-09

2016-09-14

2016-09-21 40EKH

2016-09-09

2016-09-09

2016-09-09

2016-09-09

2016-09-14

2016-09-21 22BAT


4350 Air

1

322,00

2 Denver

4381 Air

9

6998,00

4283 Sea

9

118000,00

1257 Ho Chi Minh Port

4317 Sea

78

951581,81

4739 Laem Chabang ALEXANDRIA

4298 Sea

164

199018,00

4368 Sea

14

31060,00

4342 Sea

2

20726,00

138 Shanghai

ALEXANDRIA

4382 Sea

6

31713,68

231 Hamburg

ALEXANDRIA

4370 Sea

14

17711,40

23 Hamburg

ALEXANDRIA

4341 Sea 3545 Sea 4376 Sea

19 37 13

32870,00 243,90 9676,90

234 Hamburg 1 Hamburg 70 Jebel Ali

ALEXANDRIA ALEXANDRIA DAMIETTA

4397 Sea

1

28575,35

77 Hamburg

ALEXANDRIA

4325 Sea 3517 Sea

139 32

210720,00 45904,00

1570 Hamburg 61 Antwerpen

ALEXANDRIA ALEXANDRIA

4369 Sea

2

37020,00

134 Hamburg

ALEXANDRIA

4351 Air 4430 Air

1 2

15,00 82,00

0 Frankfurt 0 Frankfurt

CAIRO CAIRO

4446 Air

11

2257,00

12 Frankfurt

CAIRO

4316 Sea

35

76810,00

301 Hamburg

ALEXANDRIA

4360 Sea

9

9805,00

52 Hamburg

ALEXANDRIA

4362 Sea

19

37245,10

88 Hamburg

ALEXANDRIA

4413 Air

1

138,00

4437 Air

2

1440,00

13 Düsseldorf

469 Shanghai

62 Izmir

CAIRO

CAIRO

ALEXANDRIA

ALEXANDRIA

ALEXANDRIA

1 Genua

CAIRO

5 Frankfurt

CAIRO

BA218/03 BA155/05 #12538999623 MS4541/06 MS541/07 #07796190113 UNION DEMETER #UD1606HCM ALX01 SCL BASILISK #LAEALE1 COSCO YANTIAN #YMLUM2313 64013 MSC JENNY #MSCUKG812 791 HANJIN TABUL #YMLUM2313 69342 RIO DE LA PLATA #SEJJSGL363 438 RIO DE LA PLATA #SGL361808 RIO BRAVO RIO BRAVO MAERSK EUPHRATES #957706453 RIO MADEIRA #SEJJSGL364 747 RIO BRAVO MSC SEATTLE #MSCUKG778 083 MSC SEATTLE #MSCURK046 002 LH584/16 MS6051/15 MS541/16 #07796190172 MS541/19 #07796190194 RIO DE LA PLATA #SEJJSGL352 186 + 5705 MSC CATERINA #MSCUKG818 244 MSC CATERINA #MSCUKG811 504 MS533/10 #07796006945 LH8290/13

2016-09-03

2016-09-02

2016-09-05

2016-09-07

2016-09-10

2016-09-21 41MB

2016-09-06

2016-09-06

2016-09-07

2016-09-07

2016-09-12

2016-09-21 00; 21C ; 22C

2016-06-08

2016-08-06

2016-09-02

2016-09-03

2016-12-09

2016-09-22 21MBR

2016-08-09

2016-08-09

2016-09-04

2016-09-04

2016-09-14

2016-09-22 11UHA

2016-08-10

2016-08-10

2016-09-09

2016-09-09

2016-09-19

2016-09-22 10URA; 20URA

2016-08-31

2016-08-31

2016-09-08

2016-09-10

2016-09-18

2016-09-22 30URA

2016-08-24

2016-08-24

2016-09-22

2016-09-17

2016-10-02

2016-09-24 11UHA; 21UHA

2016-08-31

2016-08-31

2016-09-10

2016-09-10

2016-09-20

2016-09-24 20URA

2016-08-31

2016-08-30

2016-09-10

2016-09-10

2016-09-20

2016-09-24 10URA

2016-08-10 2016-08-14 2016-09-05

2016-09-06

2016-09-23 2016-09-23 2016-09-15

2016-09-15

2016-09-25

2016-09-25 00ABA 2016-09-25 00ABA 2016-09-25 12MBR

2016-09-07

2016-09-07

2016-09-17

2016-09-17

2016-09-27

2016-09-25 00URA

2016-08-04 2016-08-27

2016-08-28

2016-09-22 2016-09-10

2016-09-10

2016-09-20

2016-09-26 00ABA 2016-09-26 31CYE; 32CYE; 41CYE; 42CYE

2016-08-28

2016-08-29

2016-09-10

2016-09-10

2016-09-20

2016-09-26 11UHA

2016-08-14 2016-09-15

2016-09-15

2016-08-25 2016-09-16

2016-09-16

2016-09-21

2016-09-27 00ABA 2016-09-27 00C ; 99UBA

2016-09-19

2016-09-19

2016-09-19

2016-09-19

2016-09-24

2016-09-27 00ABK

2016-08-31

2016-08-31

2016-09-10

2016-09-10

2016-09-20

2016-09-28 11MBR

2016-09-07

2016-09-07

2016-09-24

2016-09-25

2016-10-04

2016-09-28 22MBR

2016-09-07

2016-09-07

2016-09-24

2016-09-25

2016-10-04

2016-09-28 10MA ; 20MA ; 20MK ; 20URA; 21MK ; 31MKA

2016-09-10

2016-09-10

2016-09-10

2016-09-10

2016-09-15

2016-09-28 10URA

2016-09-13

2016-09-29

2016-09-28 00ABA


4429 Air

2

18,00

0 Frankfurt

CAIRO

2923 Air

1

222,00

2 Frankfurt

CAIRO

2924 Air

4

2168,00

9 Frankfurt

CAIRO

4435 Air

2

307,00

2 Frankfurt

CAIRO

4365 Sea

104

110186,00

804 Hamburg

4389 Sea 4407 Sea

18 2

11323,00 6600,00

4425 Air

1

59,00

0 Prag

CAIRO

4449 Air

2

8880,00

6 Prag

CAIRO

63 Hamburg 43 Antwerpen

ALEXANDRIA ALEXANDRIA ALEXANDRIA

4333 Sea

16

56640,00

4332 Sea

2

370000,00

4348 Sea

13

9681,60

4493 Air

2

329,20

2 Düsseldorf

CAIRO

4445 Air

1

686,00

2 Frankurt

CAIRO

4491 Air

1

502,00

4 Frankfurt

CAIRO

4379 Air

5

40,80

0 Frankfurt

CAIRO

4387 Sea

34

25424,68

103 Hamburg

ALEXANDRIA

4384 Sea

53

24142,60

113 Hamburg

ALEXANDRIA

4402 Sea

1

4533,31

38 Hamburg

ALEXANDRIA

4353 Sea

29

30010,64

82 Ho Chi Minh

ALEXANDRIA

2

644,00

4386 Air

211 Chennai

ALEXANDRIA

312 Rotterdam

BURULLUS

70 Jebel Ali

DAMIETTA

3 Denver

CAIRO

MS6051/15 MS541/16 #07796190161 KL8354/16 KL553/17 #07449772925 MS541/19 #07796190205 MS541/18 #07796190216 RIO DE LA PLATA RIO MADEIRA ADNAN N #012 – PS 4407 LH7431S/10 LH8290/11 #02053561255 MS541/23 #07792957222 MOZAMBIQUE # 957744753 CONSTANCE #CONST-ROTBUR-1 SAN FELIX #HLCUDX2160 808286 MS4541/30 MS541/02 #07796199585 MS6051/30 MS541/03 #07796199574 MS6051/17 MS541/02 #07796200915 KL8443/27 KL553/28 #07449772984 MSC ANTIGUA #MSCURK084 920 MSC ANTIGUA #MSCURK090 281 MSC ANTIGUA #MSCURK092 311 AEGEAN EXPRESS #SSPHHCM00 206979 BA218/06 BA155/08 #12535498724

2016-09-15

2016-09-15

2016-09-16

2016-09-16

2016-09-21

2016-09-28 21C ; 22C

2016-09-16

2016-09-16

2016-09-18

2016-09-18

2016-09-23

2016-09-28 00MB

2016-09-18

2016-09-18

2016-09-19

2016-09-19

2016-09-24

2016-09-28 00MB

2016-09-20

2016-09-20

2016-09-21

2016-09-21

2016-09-26

2016-09-28 00MB ; 41MK

2016-08-20

2016-09-19

2016-09-29 00ABA

2016-08-28 2016-09-09

2016-09-09

2016-09-24 2016-09-25

2016-09-24

2016-05-10

2016-10-01 00ABA 2016-10-02 21C ; 22C

2016-09-10

2016-09-10

2016-09-11

2016-09-11

2016-09-16

2016-10-05 42MB

2016-09-23

2016-09-23

2016-09-23

2016-09-23

2016-09-28

2016-10-05 11UHA

2016-09-05

2016-09-09

2016-09-28

2016-09-28

2016-10-08

2016-10-06 21BAT; 22BAT

2016-09-21

2016-09-22

2016-10-06

2016-10-07

2016-10-16

2016-10-07 21BAT; 22BAT

2016-09-02

2016-08-30

2016-09-30

2016-09-30

2016-10-10

2016-10-09 11MBR

2016-09-30

2016-09-30

2016-10-02

2016-10-02

2016-10-07

2016-10-09 11MBR

2016-09-30

2016-09-30

2016-10-03

2016-10-03

2016-10-08

2016-10-09 00

2016-10-01

2016-10-01

2016-10-02

2016-10-02

2016-10-07

2016-10-09 00C

2016-09-26

2016-09-27

2016-09-29

2016-09-29

2016-10-04

2016-10-09 00MB ; 00MK

2016-09-14

2016-09-14

2016-10-01

2016-10-02

2016-10-11

2016-09-14

2016-09-14

2016-10-01

2016-10-02

2016-10-11

2016-10-10 00MKC; 11MBA; 12MBA; 20MK ; 20MKA; 21BTA; 21MK ; 22BTA 2016-10-10 00EKH; 20MKA; 21MB ; 21UBA; 22MB ; 22UBA; 31UHA

2016-09-15

2016-09-14

2016-10-01

2016-10-02

2016-10-11

2016-10-10 20UBA

2016-08-30

2016-08-31

2016-09-29

2016-09-30

2016-10-09

2016-10-11 11MBR

2016-09-06

2016-09-06

2016-09-09

2016-09-09

2016-09-14

2016-10-14 21MB ; 22MB


4412 Air

1

283,00

31

255230,00

4415 Air

1

39,50

0 Frankfurt

3550 Sea

9

6309,00

12 Hamburg

ALEXANDRIA

4418 Sea

6

31869,80

231 Hamburg

ALEXANDRIA

4400 Sea

3

60373,00

207 Hamburg

ALEXANDRIA

3544 Sea

2

7280,00

21 Yilport

ALEXANDRIA

4468 Air

20

30577,95

56 Leipzig

CAIRO

4471 Air

3

45,00

0 Frankfurt

CAIRO

3554 Air

11

126,64

1 Frankfurt

CAIRO

4502 Air

1

31,00

0 Frankfurt

CAIRO

3552 Air

5

97,00

1 Frankfurt

CAIRO

4507 Air

2

3732,00

4479 Air

6

373,40

3543 Sea

32

4426 Sea

4377 Sea

2 Frankfurt

4321 Jebel Ali

19 Istanbul

CAIRO

DAMIETTA CAIRO

CAIRO

2 Düsseldorf

CAIRO

3514,64

7 Hamburg

ALEXANDRIA

420

147543,20

1264 Hamburg

ALEXANDRIA

4374 Air

2

644,00

3 Denver

CAIRO

4452 Air

3

104,00

1 Frankfurt

CAIRO

4406 Sea

161

195469,50

458 Shanghai

ALEXANDRIA

4396 Sea

10

145579,00

708 Shanghai

ALEXANDRIA

4393 Sea

4

58599,00

303 Shanghai

ALEXANDRIA

4403 Sea

65

96063,00

691 Hamburg

ALEXANDRIA

MS6051/08 MS541/09 #07796190135 PANTANAL #JEBDAM01 MS6051/15 MS541/16 #07796190183 MSC SILVIA #MSCURK102 433 MSC SILVIA #MSCUKG865 799 MSC ANTIGUA #MSCUKG853 100 MSC JENNY #MSCUKG970 839 MS4541/28 MS541/30 #07796199401 KL8350/01 KL553/03 #07449773006 KL8840/28 KL553/01 #07449772995 MS798/07 #07792595775 KL8440 / LK553 #07449772973 MS543 #07732472391 MS4541/07 MS541/09 #07796200930 MSC ANTIGUA #MSCURK096 817 MSC SILVIA #MSCUKG868 058 BA218/31 BA155/02 #12535496871 KL8350/30 KL553/03 #07449773021 COSCO ASIA # COSCO ASIA #YMLUM2313 76580 COSCO ASIA #YMLUM2313 76575 RIO BRAVO

2016-09-08

2016-09-08

2016-09-09

2016-09-09

2016-09-14

2016-10-14 00C

2016-09-12

2016-09-20

2016-10-01

2016-09-30

2016-10-11

2016-10-14 12MBR

2016-09-15

2016-09-15

2016-09-16

2016-09-16

2016-09-21

2016-10-14 00BZK

2016-09-21

2016-09-21

2016-10-09

2016-10-09

2016-10-19

2016-10-14 30URA

2016-09-21

2016-09-21

2016-10-08

2016-10-09

2016-10-18

2016-10-14 30URA

2016-09-21

2016-09-21

2016-10-08

2016-10-09

2016-10-18

2016-10-14 11UHA

2016-09-24

2016-09-25

2016-10-08

2016-10-08

2016-10-18

2016-10-14 41SGJ

2016-09-28

2016-09-28

2016-09-30

2016-09-30

2016-10-05

2016-10-14 00C ; 00EKH; 21MB ; 22MB ; 42MB

2016-10-05

2016-10-05

2016-10-06

2016-10-06

2016-10-11

2016-10-14 20C

2016-10-05

2016-10-05

2016-10-09

2016-10-09

2016-10-14

2016-10-14 10MKA; 41MK

2016-10-07

2016-10-07

2016-10-07

2016-10-07

2016-10-12

2016-10-14 22BAT

2016-10-07

2016-10-07

2016-10-09

2016-10-09

2016-10-14

2016-10-14 21MBR; 22MBR; 99UBA

2016-10-08

2016-10-08

2016-10-09

2016-10-09

2016-10-14

2016-10-14 41SGA

2016-10-11

2016-10-11

2016-10-11

2016-10-11

2016-10-16

2016-10-14 00BZK; 10MA ; 12MBR; 41SGY; 42MB

2016-09-14

2016-09-14

2016-10-01

2016-10-02

2016-10-11

2016-10-16 20MK ; 21BTA; 21MK ; 22BTA

2016-09-21

2016-09-21

2016-10-08

2016-10-09

2016-10-18

2016-10-16 00

2016-08-31

2016-09-01

2016-09-02

2016-09-02

2016-09-07

2016-10-18 31MB ; 32MB

2016-09-30

2016-10-01

2016-10-04

2016-10-04

2016-10-09

2016-10-18 00C ; 00MK

2016-09-13

2016-09-13

2016-10-13

2016-10-09

2016-10-23

2016-10-19 20URA; 30URA

2016-09-14

2016-09-13

2016-10-13

2016-10-09

2016-10-23

2016-10-19 11UHA; 21UHA

2016-09-14

2016-09-13

2016-10-13

2016-10-09

2016-10-23

2016-10-19 11UHA; 21UHA

2016-09-21

2016-09-21

2016-10-03

2016-10-19 00ABA


4511 Air

2

149,00

2 Frankfurt

CAIRO

MS6051/07 MS541/09 #07796201055 MS541/07 #07796201044 AF341M/13 AF6752/15 #05752956083 KL8440/13 KL553/14 #07449773043 KL8350/14 KL553/15 #07449773032 KL8350/14 KL553/15 #07449773065 MS798/15 #07792595860 PANTANAL #MUMDAM001 GUNDE MAERSK # RIO BRAVO RIO BRAVO RIO BLANCO #SGL356725 MS913/29 #07796137871 LH7119/15 LH8290/16 #02052165842 LH1397/15 LH8290/16 #02053561546 MSC SILVIA #MSCURK027 721 RIO BLANCO #SGL371142 RIO BLANCO #SGL370783 ABB VANESSA #LAE-ALE-002

2016-10-08

2016-10-11

2016-10-11

2016-10-11

2016-10-16

2016-10-19 00

4485 Air

2

8804,00

5 Düsseldorf

CAIRO

2016-10-12

2016-10-12

2016-10-12

2016-10-12

2016-10-17

2016-10-19 21UHA

4501 Air

5

2005,36

15 Frankfurt

CAIRO

2016-10-13

2016-10-13

2016-10-16

2016-10-16

2016-10-21

2016-10-19 00C ; 00EKH; 22MBR; 32MB

4513 Air

1

344,00

1 Frankfurt

CAIRO

2016-10-13

2016-10-13

2016-10-16

2016-10-16

2016-10-21

2016-10-19 99UBA

4520 Air

2

820,00

2 Hamburg

CAIRO

2016-10-14

2016-10-14

2016-10-16

2016-10-16

2016-10-21

2016-10-19 10URA

4492 Air

4

49,00

0 Frankfurt

CAIRO

2016-10-14

2016-10-14

2016-10-16

2016-10-16

2016-10-21

2016-10-19 00C

4519 Air

1

33,00

0 Wien

CAIRO

2016-10-15

2016-10-16

2016-10-15

2016-10-16

2016-10-20

2016-10-19 00UEN

4346 Sea

65

219592,27

581 Mumbai

DAMIETTA

4401 Sea

6

57324,00

467 Shanghai

ALEXANDRIA

2016-08-30

2016-09-04

2016-10-01

2016-09-30

2016-10-11

2016-10-20 30URA

2016-09-13

2016-09-13

2016-10-13

2016-10-12

2016-10-23

2016-10-20 11UHA; 21UHA

3551 Sea 4428 Sea 4334 Sea

12 56 47

74,30 99019,00 73140,00

0 Hamburg 849 Hamburg 391 Hamburg

ALEXANDRIA ALEXANDRIA ALEXANDRIA

2016-09-21 2016-09-21 2016-09-28

2016-09-28

2016-10-18 2016-10-18 2016-10-08

2016-10-08

2016-10-18

2016-10-20 00ABA 2016-10-20 00ABA 2016-10-20 21BAT; 22BAT

4480 Air

1

90,00

2016-09-29

2016-09-29

2016-09-29

2016-09-29

2016-10-04

2016-10-20 21MBR

4522 Air

2

2527,00

2016-10-15

2016-10-15

2016-10-16

2016-10-16

2016-10-21

2016-10-20 42MBR

4526 Air

1

163,00

2016-10-15

2016-10-15

2016-10-16

2016-10-16

2016-10-21

2016-10-20 41MB

4363 Sea

2

34074,28

193 Hamburg

ALEXANDRIA

2016-09-21

2016-09-21

2016-10-08

2016-10-09

2016-10-18

2016-10-21 21UBA; 22UBA

4335 Sea

6

127952,04

230 Hamburg

ALEXANDRIA

4431 Sea

37

49499,68

110 Hamburg

ALEXANDRIA

2016-09-28

2016-09-28

2016-10-08

2016-10-08

2016-10-18

2016-10-21 21BAT; 22BAT

2016-09-28

2016-09-28

2016-10-08

2016-10-08

2016-10-18

2016-09-12

2016-09-12

2016-10-09

2016-10-09

2016-10-19

2016-10-21 00C ; 10URA; 20URA; 21MB ; 22MB ; 30URA 2016-10-22 11MBR

4409 Sea

6

38410,00

259 Laem Chabang ALEXANDRIA

4395 Sea

9

72097,16

571 Laem Chabang ALEXANDRIA

ABB VANESSA #LAE-ALE-001

2016-09-14

2016-09-12

2016-10-12

2016-10-09

2016-10-22

2016-10-22 21UHA

4458 Sea

258

87629,00

776 Hamburg

ALEXANDRIA

2016-09-28

2016-09-28

2016-10-16

2016-10-16

2016-10-26

2016-10-22 00

2

3437,00

15 Hamburg

ALEXANDRIA

2016-09-28

2016-09-28

2016-10-16

2016-10-16

2016-10-26

2016-10-22 12MBR

4459 Sea

168

61070,40

506 Hamburg

ALEXANDRIA

2016-09-28

2016-09-28

2016-10-16

2016-10-16

2016-10-26

2016-10-22 00

4349 Sea

31

255230,00

4321 Hamriyah

MSC SINDY #MSCUKG923 085 MSC SINDY #MSCURK098 748 MSC SINDY #MSCUKG922 822 ESBJERG #HAMDMT092 016-001

4405 Sea

2016-09-24

2016-09-24

2016-10-09

2016-10-08

2016-10-19

2016-10-23 11MBR

0 Dubai

CAIRO

2 Düsseldorf

CAIRO

0 Prag

CAIRO

DAMIETTA


4438 Sea

8

8897,00

50 Hamburg

ALEXANDRIA

115 Antwerpen

ALEXANDRIA

4447 Sea

2

15150,00

4448 Sea

23

184527,00

1952 Hamburg

ALEXANDRIA

4444 Sea

3

34166,20

228 Hamburg

ALEXANDRIA

4518 Air

2

787,00

7 Frankfurt

4433 Sea

1

10380,00

69 Shanghai

ALEXANDRIA

4390 Sea

2

12400,00

103 Antwerpen

ALEXANDRIA

4443 Sea

20

55050,00

429 Antwerpen

BURULLUS

4372 Sea 4527 Air

5 6

27600,00 404,98

245 Antwerpen 3 Frankfurt

ALEXANDRIA CAIRO

3556 Air

3

50,90

4391 Sea

4

64000,00

402 Antwerpen

ALEXANDRIA

4380 Sea

7

28000,00

248 Antwerpen

ALEXANDRIA

4525 Air

1

2200,00

4538 Air

2

4521 Air

0 Frankfurt

CAIRO

CAIRO

MSC SINDY #MSCUKG913 623 VERA ROSE #002 MSC SINDY #MSCUKG901 016 MSC SINDY #MSCUKG896 828 KL8384/14 MP8910/17 #07449773054 COSCO AMERICA # VERA ROSE #003 VERA ROSE #006 VERA ROSE # KL8440/18 MP8910/24 #07449773080 KL8440/18 MP8140/20 #07449773102 VERA ROSE #004 VERA ROSE #005 KL8580/20 MP8910/24 #07448672175 MS4541/21 MS541/23 #07790445600 EK0110/21 EK0927/24 #17632545763 GRANDWAY STAR #SHALGS1606 01 RIO MADEIRA CSCL SUMMER #YMLUM2313 80537

2016-09-28

2016-09-28

2016-10-16

2016-10-16

2016-10-26

2016-10-23 21MBR

2016-09-27

2016-09-28

2016-10-11

2016-10-11

2016-10-21

2016-10-24 21MBL; 22MBL

2016-09-28

2016-09-28

2016-10-16

2016-10-16

2016-10-26

2016-10-24 21MBL; 22MBL

2016-09-28

2016-09-28

2016-10-16

2016-10-16

2016-10-26

2016-10-24 01LD ; 02LD ; 10LD ; 20LD ; 30LD ; 40LD

2016-10-14

2016-10-14

2016-10-18

2016-10-17

2016-10-23

2016-10-24 99UBA

2016-09-21

2016-09-21

2016-10-20

2016-10-18

2016-10-30

2016-10-25 12UHA

2016-09-27

2016-09-28

2016-10-10

2016-10-11

2016-10-20

2016-10-25 21MBR; 22MBR

2016-09-27

2016-09-27

2016-10-11

2016-10-11

2016-10-21

2016-10-25 21MB ; 22MB

2016-09-27 2016-10-18

2016-09-28 2016-10-18

2016-10-11 2016-10-24

2016-10-11 2016-10-21

2016-10-21 2016-10-29

2016-10-25 21MB 2016-10-26 00EKH; 41MB ; 42MB

2016-10-18

2016-10-18

2016-10-20

2016-10-21

2016-10-25

2016-10-26 00ABK; 00C ; 00URA

2016-09-27

2016-09-27

2016-10-11

2016-10-11

2016-10-21

2016-10-27 21MB ; 22MB

2016-09-27

2016-09-28

2016-10-11

2016-10-11

2016-10-21

2016-10-27 21MB ; 22MB

2016-10-20

2016-10-20

2016-10-24

2016-10-24

2016-10-29

2016-10-29 21BAT

2016-10-21

2016-10-21

2016-10-25

2016-10-24

2016-10-30

2016-10-29 00; 32MB

2016-10-21

2016-10-21

2016-10-24

2016-10-24

2016-10-29

2016-10-29 32MKA

2016-08-29

2016-08-29

2016-10-18

2016-10-18

2016-10-28

2016-10-30 11UHA

2016-08-30 2016-09-28

2016-09-28

2016-09-26 2016-10-25

2016-10-24

2016-11-04

2016-10-30 00ABA 2016-10-30 21MBL; 22MBL

7 Wien

CAIRO

66,04

0 Frankfurt

CAIRO

1

15,00

0 Charlotte

CAIRO

4331 Sea

5

85643,10

344 Shanghai

ALEXANDRIA

3548 Sea 4441 Sea

30 4

31772,00 1586,00

36 Hamburg 20 Shanghai

ALEXANDRIA ALEXANDRIA

4450 Sea

3

28468,00

227 Shanghai

ALEXANDRIA

CSCL SUMMER #YMLUM2313 80091

2016-09-28

2016-09-28

2016-10-25

2016-10-24

2016-11-04

2016-10-30 12UHA

4398 Sea

35

76810,00

301 Hamburg

ALEXANDRIA

2016-09-28

2016-10-05

2016-10-23

2016-10-23

2016-11-02

2016-10-30 12MBR

4436 Sea

5

72979,30

354 Shanghai

ALEXANDRIA

MSC AGADIR #MSCUKG874 908 CSCL SUMMER #YMLUM2313 79683

2016-09-28

2016-09-28

2016-10-25

2016-10-24

2016-11-04

2016-10-30 12UHA

4462 Sea

2

23141,00

151 Shanghai

ALEXANDRIA

CSCL SUMMER #YUMLM2313 80090

2016-09-28

2016-09-28

2016-10-25

2016-10-24

2016-11-04

2016-10-30 12UHA


3553 Sea

2

1016,00

3 Hamburg

ALEXANDRIA

4451 Sea

33

35228,88

121 Hamburg

ALEXANDRIA

4460 Sea

82

29150,00

247 Hamburg

ALEXANDRIA

4469 Sea

92

22713,00

251 Hamburg

ALEXANDRIA

4457 Sea

92

22713,00

251 Hamburg

ALEXANDRIA

4483 Sea

4

63200,00

89 Hamburg

ALEXANDRIA

4472 Sea

1

13593,00

67 Hamburg

ALEXANDRIA

4375 Sea

8

140941,11

772 Hamburg

ALEXANDRIA

4345 Sea

9

118000,00

Sea Sea Sea Sea

1 5 1 99

3,25 2,61 456500,00 1165474,38

4417 Sea

9

5557,32

4478 Sea

1

10150,00

86 Hamburg

ALEXANDRIA

4499 Sea

23

64119,00

179 Hamburg

ALEXANDRIA

4399 Sea 4508 Sea

1 36

395200,00 35574,97

240 Blexen 103 Yilport

BURULLUS ALEXANDRIA

2921 Sea 4482 Sea

1 18

2,55 121328,72

4490 Sea 4512 Air

1 1

395000,00 180,00

2928 Sea 2931 Air

1 1

2,55 72,00

0 Blexen 0 Frankfurt

ALEXANDRIA CAIRO

4543 Air

2

362,90

3 Frankfurt

CAIRO

4546 Air

4

280,18

1 Frankfurt

CAIRO

4558 Air

2

6250,00

43 Frankfurt

CAIRO

37

44910,64

2927 2926 4506 4385

4411 Sea

1257 Ho Chi Minh Port 0 Blexen 0 Blexen 441 Blexen 6234 Laem Chabang

ALEXANDRIA ALEXANDRIA ALEXANDRIA BURULLUS ALEXANDRIA

34 Laem Chabang ALEXANDRIA

0 Blexen 1034 Hamburg 240 Blexen 1 Milano

130 Ho Chi Minh Port

ALEXANDRIA ALEXANDRIA ALEXANDRIA CAIRO

ALEXANDRIA

MSC AGADIR #MSCUKG952 399 MSC AGADIR #MSCUKG940 139 MSC AGADIR #MSCUKG940 733 MSC AGADIR #MSCUKG940 790 MSC AGADIR #MSCUKG923 044 MSC AGADIR #MSCURK118 298 MSC MELISSA #MSCUKG946 235 MSC SINDY + MSC AGADIR #MSCURK070 242 AERO STAR #ASFW1601 ROCHEFORT # ROCHEFORT # ROCHEFORT # THORCO ARCTIC #LCBALE1 MSC LEVINA #MSCUW7035 527 MSC PINA #MSCUKG989 227 MSC PINA #MSCURK142 744 ROCHEFORT # MSC JENNY #MSCURK134 451 ROCHEFORT # MSC PINA #MSCUKG974 872 ROCHEFORT # MS533 #07796011031 ROCHEFORT # EY008/25 EY 657/26 #60770091696 KL8350/25 KL553/26 #07449773113 KL8440/27 KL553/29 #07449773124 LH8290/30 #02052165901 YM IMAGE #

2016-10-05

2016-10-05

2016-10-23

2016-10-23

2016-11-02

2016-10-30 21MBL; 22MBL

2016-10-05

2016-10-05

2016-10-23

2016-10-23

2016-11-02

2016-10-05

2016-10-05

2016-10-23

2016-10-23

2016-11-02

2016-10-30 00C ; 10MA ; 10MKA; 20MKA; 21BFT; 21C ; 21MB ; 22BFT; 22BJT; 22C ; 22MB 2016-10-30 00

2016-10-05

2016-10-05

2016-10-23

2016-10-23

2016-11-02

2016-10-30 00

2016-10-05

2016-10-05

2016-10-23

2016-10-23

2016-11-02

2016-10-30 00

2016-10-05

2016-10-05

2016-10-23

2016-10-23

2016-11-02

2016-10-30 21MB ; 22MB

2016-10-10

2016-10-10

2016-10-23

2016-10-23

2016-11-02

2016-10-30 11UHA

2016-09-28

2016-09-28

2016-10-16

2016-10-16

2016-10-26

2016-10-30 21UBA; 22UBA

2016-09-29

2016-09-28

2016-10-19

2016-10-19

2016-10-29

2016-10-30 11MBR

2016-10-15 2016-10-15 2016-10-15 2016-09-16

2016-10-14 2016-10-14 2016-10-14 2016-09-17

2016-10-30 2016-10-30 2016-10-29 2016-10-14

2016-10-30 2016-10-30 2016-10-29 2016-10-10

2016-11-09 2016-11-09 2016-11-08 2016-10-24

2016-10-30 2016-10-30 2016-10-30 2016-10-31

2016-09-13

2016-09-13

2016-10-29

2016-10-29

2016-11-08

2016-11-01 11MBR

2016-10-12

2016-10-12

2016-10-29

2016-10-29

2016-11-08

2016-11-01 00URA

2016-10-12

2016-10-12

2016-10-29

2016-10-29

2016-11-08

2016-11-01 22MPB

2016-10-15 2016-10-12

2016-10-14 2016-10-16

2016-10-30 2016-10-29

2016-10-30 2016-10-29

2016-11-09 2016-11-08

2016-11-01 21MK 2016-11-01 11SGA; 11SGC; 21SGA; 21SGC; 31SGA

2016-10-15 2016-10-12

2016-10-14 2016-10-12

2016-10-30 2016-10-29

2016-10-30 2016-10-29

2016-11-09 2016-11-08

2016-11-01 21MK 2016-11-02 11UHA; 40URA

2016-10-15 2016-10-09

2016-10-14 2016-10-10

2016-10-30 2016-10-09

2016-10-30 2016-10-09

2016-11-09 2016-10-14

2016-11-02 10MKA 2016-11-02 00URA

2016-10-15 2016-10-25

2016-10-14 2016-10-25

2016-10-30 2016-10-26

2016-10-30 2016-10-28

2016-11-09 2016-10-31

2016-11-02 10MKA 2016-11-02 00MK

2016-10-25

2016-10-25

2016-10-26

2016-10-27

2016-10-31

2016-11-02 42MB

2016-10-27

2016-10-27

2016-10-29

2016-10-30

2016-11-03

2016-11-02 11MBR; 41MK ; 42MB

2016-10-30

2016-10-30

2016-10-30

2016-10-30

2016-11-04

2016-11-02 10EKH; 20EKH

2016-09-27

2016-09-27

2016-10-20

2016-10-18

2016-10-30

2016-11-03 12MBR

21MB 21MB 21MB 11UHA; 21UHA


4539 Air

7

478,70

2 Düsseldorf

CAIRO

4568 Air

1

24,00

0 Frankfurt

CAIRO

4559 Air

2

269,00

2 Frankfurt

CAIRO

4574 Air

2

2710,00

4 Frankfurt

CAIRO

2932 Air

1

136,00

1 Frankfurt

CAIRO

4481 Sea

14

29980,00

4534 Sea 2930 Sea 4422 Sea

1 6 14

451255,00 7,39 24569,00

4465 Sea

59

4421 Sea

59 Izmir

ALEXANDRIA

KL8440/28 MP8910/31 #07449773161 KL8440/28 KL0553/29 #07449773146 KL8360/28 KL0553/29 #07449773135 KL8440/28 KL553/29 #07449773150 KL8350/29 MP8910/31 #07449773172 MSC JENNY #MSCUKG981 984 HOHE BANK # HOHE BANK # CSCL SUMMER #INMUM0000 000111

2016-10-28

2016-10-28

2016-10-31

2016-10-31

2016-11-05

2016-11-03 22MK ; 30EKH; 32C ; 32MKA; 42BAB; 42MKA; 99UBA

2016-10-28

2016-10-28

2016-11-01

2016-11-01

2016-11-06

2016-11-03 42MBR

2016-10-28

2016-10-28

2016-11-01

2016-11-01

2016-11-06

2016-11-03 00

2016-10-28

2016-10-28

2016-10-29

2016-10-30

2016-11-03

2016-11-03 42MBR

2016-10-29

2016-10-29

2016-10-31

2016-10-31

2016-11-05

2016-11-03 00MB

2016-10-15

2016-10-19

2016-10-29

2016-10-29

2016-11-08

2016-11-06 40URA

2016-10-20 2016-10-20 2016-09-30

2016-10-20 2016-10-20 2016-09-30

2016-11-06 2016-11-06 2016-11-03

2016-11-06 2016-11-06 2016-11-04

2016-11-16 2016-11-16 2016-11-13

2016-11-06 22MB 2016-11-06 22MB 2016-11-07 20URA

2016-11-07 00; 10LBG; 10MKA; 10PGB; 11MB ; 20C ; 21C ; 21MB ; 21MK ; 22C ; 22MB ; 30URA; 40URA 2016-11-07 10MKA; 20MKA; 21MBV; 21MPR; 22MPR

441 Blexen 0 Blexen 222 Mumbai

BURULLUS ALEXANDRIA ALEXANDRIA

21677,97

124 Hamburg

ALEXANDRIA

MSC PINA #MSCUKG975 564

2016-10-12

2016-10-12

2016-10-29

2016-10-29

2016-11-08

30

93110,00

604 Hamburg

ALEXANDRIA

2016-10-12

2016-10-12

2016-10-29

2016-10-29

2016-11-08

4371 Sea

25

87648,00

130 Shanghai

ALEXANDRIA

2016-09-12

2016-09-17

2016-10-29

2016-10-29

2016-11-08

2016-11-07 21BBT; 22BBT

2922 Sea 4322 Sea 4440 Sea

1 1 2

2,55 395200,00 36821,32

0 Blexen 240 Blexen 159 Shanghai

BURULLUS BURULLUS ALEXANDRIA

MSC PINA #MSCUKG938 984 NIKATOR #NK1601SHAL X02 HOHE BANK # HOHE BANK # CSCL AUTUMN #YMLUM2313 83410

2016-10-20 2016-10-20 2016-10-05

2016-10-20 2016-10-20 2016-10-05

2016-11-03 2016-11-03 2016-11-03

2016-11-06 2016-11-06 2016-11-04

2016-11-13 2016-11-13 2016-11-13

2016-11-07 22MK 2016-11-07 22MK 2016-11-08 21MBL; 22MBL

4484 Sea

24

15005,04

53 Hamburg

ALEXANDRIA

2016-10-19

2016-10-19

2016-11-07

2016-11-07

2016-11-17

2016-11-09 10; 10MKA; 11; 12; 21BAB; 21MB ; 22BAB; 22MB

3546 Sea

1

270,00

1 Shanghai

ALEXANDRIA

2016-09-27

2016-09-27

2016-11-02

2016-11-02

2016-11-12

2016-11-09 21BBT

4514 Sea

4

27100,00

231 Hamburg

ALEXANDRIA

2016-10-19

2016-10-19

2016-11-07

2016-11-07

2016-11-17

2016-11-09 21MB ; 22MB

4495 Air

2

336,00

2016-10-19

2016-10-20

2016-10-27

2016-10-27

2016-11-01

2016-11-10 00ABA

4600 Air

1

2016-11-05

2016-11-05

2016-11-06

2016-11-06

2016-11-11

2016-11-10 99UBA

4578 Air

2016-11-03

2016-11-03

2016-11-05

2016-11-05

2016-11-10

2016-11-10 00UEN

4563 Air

MSC ELENI #MSCURK135 482 GJERTRUD MAERSK #MSCUYD548 452 MSC ELENI #MSCURK160 894 EK9542/18 EK9992/20 EK9 #17632545645 MS1584 MS541 #07712344555 KL8440/03 KL553/04 #07449773183 MS4541/26 MS541/30 #07790872283

2016-10-26

2016-10-26

2016-10-30

2016-10-30

2016-11-04

2016-11-10 00UEN

3 Miami

CAIRO

11,05

0 Frankfurt

CAIRO

1

160,00

0 Frankfurt

CAIRO

1

380,00

0 Frankfurt

CAIRO


4515 Sea

1

8800,00

67 Rotterdam

4420 Sea

12

22342,00

4602 Air

1

302,60

0 Frankfurt

CAIRO

4576 Air

7

1740,39

7 Frankfurt

CAIRO

4503 Sea

21

20588,89

46 Hamburg

ALEXANDRIA

4361 Sea

6

26335,00

29 Ulsan

BURULLUS

4467 Sea

6

19000,00

153 Hamburg

ALEXANDRIA

4473 Sea

4

3802,00

13 Hamburg

ALEXANDRIA

4461 Sea

428

144936,80

1288 Hamburg

ALEXANDRIA

4463 Sea

8

44310,00

187 Antwerpen

ALEXANDRIA

4392 Sea

20

130996,00

1401 Antwerpen

ALEXANDRIA

4486 Sea

10

30653,58

126 Antwerpen

ALEXANDRIA

4504 Sea

23

64119,00

179 Hamburg

ALEXANDRIA

4470 Sea

4

39871,02

308 Abu Dhabi

DAMIETTA

4442 Sea

2

510,00

2 Shanghai

ALEXANDRIA

4500 Sea

12

119894,00

919 Hamburg

ALEXANDRIA

4432 Sea

2

34068,00

333 Antwerpen

BURULLUS

4587 Air

1

408,00

1 Shanghai

CAIRO

4608 Air

1

187,20

1 Istanbul

CAIRO

4616 Air

1

25,50

0 Ho Chi Minh

CAIRO

4505 Sea

4

32580,00

213 Hamburg

ALEXANDRIA

4553 Sea

4

5694,00

13 Hamburg

ALEXANDRIA

4455 Sea

20

13684,00

60 Hamburg

ALEXANDRIA

4454 Sea

97

39416,00

758 Hamburg

ALEXANDRIA

478 Mumbai

ALEXANDRIA

ALEXANDRIA

MSC FLAMINIA #MSCURK190 974 MAERSK DANUBE #769291887 KL8440 MP8910 #07449773216 KL8440 MP8910 #07449773194 MSC ELENI #MSCURK177 310 DA ZI YUN #ULS-ALX 002

2016-10-24

2016-10-24

2016-11-07

2016-11-07

2016-11-17

2016-11-11 11UHA

2016-10-13

2016-10-12

2016-11-05

2016-11-05

2016-11-15

2016-11-13 30URA; 40URA

2016-11-04

2016-11-04

2016-11-07

2016-11-07

2016-11-12

2016-11-13 42MBR

2016-11-04

2016-11-04

2016-11-07

2016-11-08

2016-11-12

2016-11-13 00C ; 21MB ; 41MB ; 42C ; 99UBA

2016-10-19

2016-10-19

2016-11-07

2016-11-07

2016-11-17

2016-11-13 21MB ; 22MB

2016-09-19

2016-09-19

2016-11-05

2016-11-05

2016-11-15

2016-11-13 11UHA

MSC ELENI #MSCURK161 389 MSC ELENI #MSCURK177 047 MSC ELENI #MSCUKG936 301 VECHTDIEP #010 VECHTDIEP #009 VECHTDIEP #012 MSC ELENI #MSCURK143 478 THORSTAR #HLCUDX2160 906870 CSCL AUTUMN #YMLUM2313 80536

2016-10-19

2016-10-19

2016-11-07

2016-11-07

2016-11-17

2016-11-14 11UHA

2016-10-19

2016-10-19

2016-11-07

2016-11-07

2016-11-17

2016-11-14 11; 12

2016-10-19

2016-10-19

2016-11-07

2016-11-07

2016-11-17

2016-11-14 00

2016-10-24

2016-10-21

2016-11-02

2016-11-02

2016-11-12

2016-11-14 00UEN

2016-10-24

2016-10-21

2016-11-02

2016-11-02

2016-11-12

2016-11-14 21MBV; 21MPR; 22MBV; 22MPR

2016-10-24

2016-10-21

2016-11-02

2016-11-02

2016-11-12

2016-11-14 00

2016-10-19

2016-10-19

2016-11-07

2016-11-07

2016-11-17

2016-11-14 21MPB

2016-10-04

2016-10-04

2016-11-09

2016-11-09

2016-11-19

2016-11-15 21MB ; 22MB

2016-10-05

2016-10-05

2016-11-04

2016-11-04

2016-11-14

2016-11-15 21MBL; 22MBL

MSC ELENI #MSCURK161 272 VECHTDIEP #011 EK9873/04 EK0923/05 #17632884574 MS543/05 #07792473872 EK0393/10 EK0927/12 #17630858925 MSC ELENI #MSCURK160 597 MSC CAROLE #MSCURK223 585 MSC CAROLE #MSCUKG935 873 RIO BRAVO #SGL372658

2016-10-19

2016-10-19

2016-11-07

2016-11-07

2016-11-17

2016-11-15 21MPB; 22MPB

2016-10-24

2016-10-21

2016-11-02

2016-11-02

2016-11-12

2016-11-15 21MBR; 22MBR

2016-11-04

2016-11-04

2016-11-05

2016-11-05

2016-11-10

2016-11-15 11UHA

2016-11-05

2016-11-05

2016-11-05

2016-11-05

2016-11-10

2016-11-15 30SGC

2016-11-10

2016-11-10

2016-11-12

2016-11-12

2016-11-17

2016-11-15 11MBR

2016-10-19

2016-10-19

2016-11-07

2016-11-07

2016-11-17

2016-11-15 10LD ; 20LD ; 30LD ; 40LD

2016-10-26

2016-10-26

2016-11-12

2016-11-12

2016-11-22

2016-11-15 21CYE; 22CYE

2016-10-26

2016-10-26

2016-11-12

2016-11-12

2016-11-22

2016-11-16 22BAA

2016-10-26

2016-10-26

2016-11-05

2016-11-05

2016-11-15

2016-11-16 21BAA; 22BAA


4592 Air

2

2700,00

2 Frankfurt

4582 Air

22

29369,00

173 Jebel Ali Port

CAIRO

4535 Sea

3

29980,00

209 Hamburg

ALEXANDRIA

4544 Sea

4

14164,00

31 Hamburg

ALEXANDRIA

3558 Sea

4

1885,00

4358 Sea

24

3086000,00

4510 Sea

42

65155,26

4561 Sea

1

20493,00

4552 Sea

2

13960,00

151 Hamburg

ALEXANDRIA

3555 Sea

4

243,20

1 Hamburg

ALEXANDRIA

4541 Sea

10

9457,00

52 Jebel Ali

4366 Sea

12

22782,00

477 Mumbai

4464 Sea

6

7320,00

6 Shanghai

ALEXANDRIA

4596 Air

1

8,00

0 Frankfurt

CAIRO

4595 Air

12

3444,53

10 Frankfurt

CAIRO

4625 Air

1

31,50

0 Frankfurt

CAIRO

4617 Air

2

1074,00

3 Frankfurt

CAIRO

4637 Air

1

10,50

0 Düsseldorf

CAIRO

4618 Air

1

663,00

1 Genua

CAIRO

4629 Air

2

3191,80

2 Düsseldorf

CAIRO

4642 Air

1

69,60

0 Dubai

CAIRO

4 Antwerpen

6607 Ulsan 193 Hamburg 67 Rotterdam

CAIRO

ALEXANDRIA

BURULLUS ALEXANDRIA ALEXANDRIA

DAMIETTA ALEXANDRIA

KL8440/09 KL553/10 #07449773220 EK9735 #17634306893 MSC CAROLE #MSCURK201 276 MSC CAROLE #MSCURK226 687 E.R. LONG BEACH #MSCURK241 009 DA ZI YUN #ULS-ALX001 MSC CAROLE #MSCURK240 548 E. R. LONG BEACH #MSCURK234 046 RIO BLANCO #SGL386952 MSC ELENI #MSCUKG961 895 MAERSK EUPHRATES #958320177 MAERSK DANUBE #958057435 CSCL SPRING #YMLUM2313 84977 MS9537T/09 MS541/11 #07792596302 KL8440/11 MP8910/14 #07449773231 MS1520/15 MS541/16 #07790881195 KL8290/09 KL553/11 #07449773242 MS1520/15 MS541/16 #07790881206 KL553/17 #07449682765 KL8440/17 KL553/18 #07449773253 QR1015/18 QR1301/18 #15701575383

2016-11-09

2016-11-09

2016-11-11

2016-11-11

2016-11-16

2016-11-16 32MBR

2016-11-10

2016-11-10

2016-11-10

2016-11-10

2016-11-15

2016-11-16 41MBR

2016-10-26

2016-10-26

2016-11-12

2016-11-12

2016-11-22

2016-11-17 00ABK

2016-10-26

2016-10-26

2016-11-12

2016-11-12

2016-11-22

2016-11-17 00

2016-10-30

2016-10-30

2016-11-13

2016-11-12

2016-11-22

2016-11-17 00C

2016-09-19

2016-09-19

2016-11-05

2016-11-05

2016-11-15

2016-11-18 11UHA

2016-10-26

2016-10-26

2016-11-12

2016-11-12

2016-11-22

2016-10-31

2016-10-31

2016-11-12

2016-11-12

2016-11-22

2016-11-18 00; 00C ; 10; 10MA ; 11; 12; 1x; 20MA ; 20MKA; 21MB ; 22MB 2016-11-18 11UHA

2016-11-02

2016-11-02

2016-11-12

2016-11-12

2016-11-22

2016-11-18 21CYE; 22CYE

2016-10-19

2016-10-19

2016-11-07

2016-11-07

2016-11-17

2016-11-19 22BAA

2016-10-31

2016-10-31

2016-11-10

2016-11-10

2016-11-20

2016-11-21 42MBR

2016-10-13

2016-10-12

2016-11-05

2016-11-05

2016-11-15

2016-11-21 10URA; 20URA

2016-10-19

2016-10-19

2016-11-12

2016-11-12

2016-11-22

2016-11-22 00

2016-11-09

2016-11-09

2016-11-11

2016-11-11

2016-11-16

2016-11-22 22CYE

2016-11-11

2016-11-11

2016-11-14

2016-11-14

2016-11-19

2016-11-22 00C ; 00EKH; 31C ; 32C ; 42MB

2016-11-15

2016-11-15

2016-11-16

2016-11-16

2016-11-21

2016-11-22 21C

2016-11-09

2016-11-09

2016-11-12

2016-11-12

2016-11-17

2016-11-23 00

2016-11-15

2016-11-16

2016-11-16

2016-11-16

2016-11-21

2016-11-23 00UEN

2016-11-16

2016-11-15

2016-11-22

2016-11-21

2016-11-27

2016-11-24 00URA

2016-11-17

2016-11-17

2016-11-19

2016-11-19

2016-11-24

2016-11-24 22MBR

2016-11-18

2016-11-18

2016-11-18

2016-11-18

2016-11-23

2016-11-24 41MBR


4649 Air

1

0,98

0 Düsseldorf

CAIRO

3564 Air

10

101,30

0 Düsseldorf

CAIRO

4509 Sea

161

195184,00

4488 Sea

1

4590 Sea

458 Shanghai

ALEXANDRIA

17655,19

67 Chennai

ALEXANDRIA

1

16561,00

69 Rotterdam

ALEXANDRIA

4579 Sea

1

9213,00

67 Rotterdam

ALEXANDRIA

4494 Sea

75

244952,95

4653 Air

3

64,20

0 München

CAIRO

3562 Air

2

149,35

0 Frankfurt

CAIRO

4453 Sea

81

962450,81

4554 Sea

10

27410,00

69 Gemlik

ALEXANDRIA

4572 Sea

12

26072,00

329 Hamburg

ALEXANDRIA

4549 Sea

39

64874,70

133 Hamburg

ALEXANDRIA

4423 Sea

6

10784,40

74 Santos

ALEXANDRIA

4427 Sea

6

26335,00

29 Ulsan

BURULLUS

4498 Sea

5

51997,00

4619 Air

5

226,20

4655 Air

1

62,00

4645 Air

1

2368,00

4667 Air

1

9,50

4551 Sea

2

28073,30

655 Mumbai

ALEXANDRIA

5012 Laem Chabang ALEXANDRIA

378 Shanghai

ALEXANDRIA

1 Düsseldorf

CAIRO

0 Prag

CAIRO

6 Frankfurt

CAIRO

0 Düsseldorf

CAIRO

134 Shanghai

ALEXANDRIA

AF341M/19 AF508/20 #05752956120 KL8440/16 MP8910/21 #07449773286 CSCL SPRING #YMLUM2313 84973 EURO MAX #YMLUM5150 68417 MSC SEATTLE #MSCURK308 576 MSC SEATTLE #MSCURK278 258 BBC CANADA #MUMALEX00 1 MS788/19 #07790881221 TK1884/19 TK690/20 #23510063093 THORCO LOGOS #LCBALE4431 0 MSC GIOVANNA #MSCURK248 350 MSC SASHA #MSCURK281 997 MSC SASHA #MSCURK287 622 MSC AJACCIO #MSCUZS829 845 DA TONG YUN #ULS-ALX4427 CSCL SPRING #YMLUM2313 84975 AF341M/21 AF508/23 #05752956131 OS712/22 OS863 #02053562025 MS1584/23 MS537/23 #07790881210 KL8440/24 KL553/25 #074-4977 3312 CSCL WINTER #YMLUM2313 87920

2016-11-18

2016-11-18

2016-11-20

2016-11-21

2016-11-25

2016-11-24 40SGY

2016-11-16

2016-11-17

2016-11-21

2016-11-21

2016-11-26

2016-11-24 00MA

2016-10-19

2016-10-19

2016-11-12

2016-11-12

2016-11-22

2016-11-24 30URA; 40URA

2016-10-20

2016-10-20

2016-11-20

2016-11-19

2016-11-30

2016-11-25 11MB

2016-11-07

2016-11-08

2016-11-19

2016-11-19

2016-11-29

2016-11-25 11UHA

2016-11-07

2016-11-08

2016-11-19

2016-11-19

2016-11-29

2016-11-25 12UHA

2016-10-13

2016-10-14

2016-11-01

2016-11-01

2016-11-11

2016-11-26 00URA; 10URA; 20URA; 30URA; 40URA

2016-11-19

2016-11-19

2016-11-19

2016-11-19

2016-11-24

2016-11-26 00MB

2016-11-19

2016-11-19

2016-11-20

2016-11-20

2016-11-25

2016-11-26 32BAT

2016-10-17

2016-10-15

2016-11-10

2016-11-09

2016-11-20

2016-11-27 22UHA

2016-11-07

2016-11-07

2016-11-18

2016-11-18

2016-11-28

2016-11-27 10; 1x

2016-11-02

2016-11-03

2016-11-19

2016-11-19

2016-11-29

2016-11-27 11MB ; 12MB ; 21MB ; 22MB

2016-11-02

2016-11-03

2016-11-19

2016-11-19

2016-11-29

2016-11-27 10; 10MA ; 10MKA; 21CYE; 22CYE; 30URA

2016-09-27

2016-09-23

2016-10-23

2016-10-23

2016-11-02

2016-11-28 10URA

2016-10-04

2016-10-04

2016-11-24

2016-11-24

2016-12-04

2016-11-28 21UHA

2016-10-19

2016-10-19

2016-11-26

2016-11-26

2016-12-06

2016-11-28 22UHA

2016-11-21

2016-11-21

2016-11-23

2016-11-23

2016-11-28

2016-11-28 21C ; 42MB ; 42MBA; 42MBR; 99UBA

2016-11-22

2016-11-22

2016-11-23

2016-11-23

2016-11-28

2016-11-28 41MB

2016-11-23

2016-11-23

2016-11-23

2016-11-23

2016-11-28

2016-11-28 31MKA

2016-11-24

2016-11-24

2016-11-26

2016-11-26

2016-12-01

2016-11-28 32MBR

2016-10-28

2016-10-26

2016-11-22

2016-11-22

2016-12-07

2016-11-28 21UHA


4581 Air

1

58,00

0 Charlotte

CAIRO

4612 Sea

3

28600,00

209 Hamburg

ALEXANDRIA

4477 Sea

6

11590,10

74 Santos

ALEXANDRIA

4638 Air

9

1451,00

5 Frankfurt

CAIRO

4489 Air

1

125,00

1 Frankfurt

CAIRO

4666 Air

2

171,00

1 Wien

CAIRO

4660 Air

6

99,80

0 Düsseldorf

CAIRO

3566 Air

5

85,40

0 Frankfurt

CAIRO

3565 Air

1

5,00

0 Wien

CAIRO

4562 Air 4583 Sea

1 21

310,00 8504,00

4611 Sea

1

4523 Sea

3 Frankfurt 22 Hamburg

CAIRO ALEXANDRIA

18130,00

67 Rotterdam

ALEXANDRIA

10

10745,00

51 Hamburg

ALEXANDRIA

4517 Sea

7

94816,00

468 Shanghai

ALEXANDRIA

3561 Sea

20

28832,00

4328 Sea

129

87561,00

4570 Sea

29

23254,17

4661 Air

1

4765,00

4664 Air

8

23

4557 Sea

38 Antwerpen 224 Yilport 99 Hamburg

ALEXANDRIA ALEXANDRIA ALEXANDRIA

2 Amsterdam

CAIRO

426,50

1 Frankfurt

CAIRO

13143,00

26 Shanghai

ALEXANDRIA

EY130/22 EY653/24 #60772126596 RIO MADEIRA #SGL393107 MSC MELINE #MSCUZS839 042 KL8440/23 KL553/24 #07449773301 KL8350/23 KL553/24 #07449773290 TK1888/24 TK0690/25 #23562467296 AF341M/25 AF6752/26 #05752956142 KL8440/24 KL553/28 #07449773334 TK1888/24 TK694/25 #23562467263 LH584/21 MSC ANTIGUA #MSCURK305 960 MSC MELISSA #MSCURK344 860 MSC AGRIGENTO #MSCURK333 442 GUTHORM MAERSK #MSCUYD937 895 MSC MELISSA #MSCURK318 047 MSC JENNY #MSCURK292 051 RIO BRAVO #MSCURK339 696 KL8440/25 MP8910/28 #07449773323 KL8440/01 KL553/02 #07449773345 COSCO KAOHSIUNG #YMLUM2313 89684

2016-11-21

2016-11-21

2016-11-24

2016-11-24

2016-11-29

2016-11-28 31MKA

2016-11-16

2016-11-16

2016-11-26

2016-11-27

2016-12-06

2016-11-30 00ABK

2016-10-05

2016-10-05

2016-10-29

2016-10-29

2016-11-08

2016-12-01 20URA

2016-11-23

2016-11-23

2016-11-25

2016-11-25

2016-11-30

2016-12-01 00C ; 00EKH; 10MA ; 41MK ; 42MB ; 42UBA

2016-11-23

2016-11-23

2016-11-25

2016-11-25

2016-11-30

2016-12-01 00ABA

2016-11-24

2016-11-24

2016-11-25

2016-11-25

2016-11-30

2016-12-01 42CYE

2016-11-25

2016-11-25

2016-11-27

2016-11-27

2016-12-02

2016-12-01 00C ; 00EKH; 42MB ; 42MBR

2016-11-24

2016-11-24

2016-11-29

2016-11-26

2016-12-04

2016-12-01 41MK

2016-11-24

2016-11-24

2016-11-25

2016-11-25

2016-11-30

2016-12-01 42CYE

2016-10-21 2016-11-09

2016-11-10

2016-11-14 2016-11-27

2016-11-27

2016-12-07

2016-12-02 00ABA 2016-12-02 00; 10; 11; 12; 99

2016-11-14

2016-11-14

2016-11-27

2016-11-27

2016-12-07

2016-12-02 12UHA

2016-11-09

2016-11-10

2016-11-27

2016-11-27

2016-12-07

2016-12-03 11MBR

2016-10-26

2016-10-25

2016-11-29

2016-11-29

2016-12-09

2016-12-03 11UHA

2016-11-12

2016-11-12

2016-11-27

2016-11-27

2016-12-07

2016-12-04 21CYE; 22CYE

2016-11-16

2016-11-16

2016-11-29

2016-11-29

2016-12-09

2016-12-04 10SGC; 20SGC; 30SGC; 40SGC

2016-11-09

2016-11-10

2016-11-26

2016-11-27

2016-12-06

2016-12-05 00C ; 10; 10EKH; 10MA ; 11; 12; 20MA ; 22MB

2016-11-25

2016-11-24

2016-12-01

2016-11-29

2016-12-06

2016-12-07 12UHA

2016-12-01

2016-12-01

2016-12-03

2016-12-03

2016-12-08

2016-12-07 00C ; 00URA; 11C ; 11MB ; 30C

2016-11-02

2016-11-03

2016-12-03

2016-12-03

2016-12-13

2016-12-07 1x


4569 Sea

10

40376,58

160 Ho Chi Minh Port

ALEXANDRIA

4416 Sea

113

69077,93

38 Shanghai

ALEXANDRIA

4555 Sea

2

22853,00

151 Shanghai

ALEXANDRIA

4556 Sea

9

22250,00

124 Izmir

ALEXANDRIA

4419 Sea

6607 Ulsan

24

3086000,00

3560 Air

4

3,00

4496 Sea

6

26335,00

4487 Sea

14

37579,10

157 Antwerpen

ALEXANDRIA

4589 Sea

24

10348,14

37 Hamburg

ALEXANDRIA

4410 Sea

9

118000,00

1257 Ho Chi Minh Port

ALEXANDRIA

4530 Sea

11

206349,00

796 Banten

ALEXANDRIA

4475 Sea

11

206233,00

837 Banten

ALEXANDRIA

4540 Sea

2

4832,60

36 Antwerpen

4636 Air

1

510,00

1 Düsseldorf

4644 Sea

2

42602,00

134 Rotterdam

2934 Air

1

17,50

4394 Sea

5

25083,00

4532 Sea

6

4474 Sea

0 Budapest

29 Ulsan

0 Frankfurt

BURULLUS CAIRO

BURULLUS

ALEXANDRIA CAIRO

ALEXANDRIA CAIRO

179 Ho Chi Minh Port

ALEXANDRIA

144985,00

656 Banten

ALEXANDRIA

2

152547,00

461 Banten

ALEXANDRIA

4524 Sea

2

152200,00

461 Banten

ALEXANDRIA

4586 Sea

2

13765,00

4679 Air

2

485,00

59 Hamburg 4 Stockholm

ALEXANDRIA CAIRO

YM INTERACTION #YMLUM4903 01480 COSCO KAOHSIUNG #YMLUM2313 89594 COSCO KAOHSIUNG #YMLUM2313 89616 TURKON EGYPT #ALIALY71090 4 DA TONG YUN # BA869/25 BA155/27 #12532987732 DA HONG XIA #ULS-ALX4496 AMELAND #014 MSC BRUNELLA #MSCURK365 337 VICENTE #POBUSGNAL Y160001 VICENTE #POBUBATALY 160004 VICENTE #POBUBATALY 160002 AMELAND #015 KL8440/16 KL553/17 #07449773275 MSC LORETTA #MSCURK422 799 MS1520/01 MS541/02 #07790881232 VICENTE #POBUSGNAL Y160002 VICENTE #POBUBATALY 160005 VICENTE #POBUBATALY 160001 VICENTE #POBUBATALY 160003 AMELAND #013 KL9316/30 KL8160/01 MP8 #07450679392

2016-11-08

2016-11-06

2016-12-03

2016-12-03

2016-12-13

2016-12-07 12MBR

2016-11-02

2016-11-03

2016-12-03

2016-12-03

2016-12-13

2016-12-08 00

2016-11-02

2016-11-03

2016-12-03

2016-12-03

2016-12-13

2016-12-08 31UHA

2016-11-23

2016-11-23

2016-11-27

2016-11-27

2016-12-07

2016-12-08 20URA

2016-10-04

2016-10-04

2016-11-24

2016-11-24

2016-12-04

2016-12-09 21UHA

2016-11-26

2016-11-27

2016-11-30

2016-12-01

2016-12-05

2016-12-09 10MA

2016-11-01

2016-11-01

2016-12-03

2016-12-03

2016-12-13

2016-12-10 12UHA

2016-11-15

2016-11-16

2016-11-30

2016-12-01

2016-12-10

2016-12-10 00

2016-11-16

2016-11-17

2016-12-04

2016-12-04

2016-12-14

2016-12-10 00

2016-10-15

2016-10-23

2016-11-25

2016-11-26

2016-12-05

2016-12-11 12MBR

2016-11-04

2016-11-06

2016-11-25

2016-11-26

2016-12-05

2016-12-12 20MA

2016-11-04

2016-11-06

2016-11-25

2016-11-26

2016-12-05

2016-12-12 10MA

2016-11-15

2016-11-16

2016-11-30

2016-12-01

2016-12-10

2016-12-12 00; 20MA

2016-11-16

2016-11-16

2016-11-18

2016-11-18

2016-11-23

2016-12-12 00

2016-11-21

2016-11-23

2016-12-04

2016-12-04

2016-12-14

2016-12-12 11UHA

2016-12-01

2016-12-01

2016-12-02

2016-12-02

2016-12-07

2016-12-12 00

2016-10-15

2016-10-23

2016-11-25

2016-11-25

2016-12-05

2016-12-13 11UHA; 21UHA

2016-11-04

2016-11-06

2016-11-25

2016-11-26

2016-12-05

2016-12-13 10MA

2016-11-04

2016-11-06

2016-11-25

2016-11-25

2016-12-05

2016-12-14 10MA

2016-11-04

2016-11-06

2016-11-25

2016-11-25

2016-12-05

2016-12-14 20MA

2016-11-15

2016-11-16

2016-11-30

2016-12-01

2016-12-10

2016-12-14 12MBJ

2016-11-30

2016-11-30

2016-12-07

2016-12-07

2016-12-12

2016-12-14 10PUR


2925 Sea 2929 Sea

9 9

29527,61 29527,61

44 Blexen 44 Blexen

ALEXANDRIA ALEXANDRIA

3568 Air

4

2,00

0 Budapest

CAIRO

4703 Air

6

474,75

2 Frankfurt

CAIRO

2935 Air

2

481,50

1 Frankfurt

CAIRO

4476 Sea

14

267991,00

4591 Sea

16

4567 Sea

4753 Air

711 Antwerpen

ALEXANDRIA

14175,16

40 Hamburg

ALEXANDRIA

3

28996,00

201 Shanghai

ALEXANDRIA

2

32,10

0 Frankfurt

4456 Sea

95

1099958,00

4588 Sea

1

10119,70

78 Shanghai

ALEXANDRIA

4584 Sea

1

17675,19

67 Mumbai

ALEXANDRIA

4662 Sea

1

19594,00

67 Rotterdam

ALEXANDRIA

4620 Sea

1

15860,00

86 Hamburg

ALEXANDRIA

4580 Sea

4

52493,00

268 Shanghai

ALEXANDRIA

4610 Sea

803 Hamburg

ALEXANDRIA

CAIRO

5981 Laem Chabang ALEXANDRIA

12

89965,00

4690 Air

3

9096,00

6 Amsterdam

CAIRO

4712 Air

2

1470,00

1 Amsterdam

CAIRO

4528 Air

1

4544,00

3 Amsterdam

CAIRO

4738 Air

1

120,00

1 Amsterdam

CAIRO

4564 Sea

6

19000,00

153 Hamburg

ALEXANDRIA

ROCHEFORT # HOHE BANK #HOHE_BLEBUR-1C BA869/02 BA0155/04 #12532987721 MS1520/05 MS541/07 #07790881243 AF341/05 AF6740/07 #05752956164 AMELAND #016 MSC ALGECIRAS #MSCURK371 509 CSCL YELLOW SEA #YMLUM2313 92970 MS1520 MS541 #07790881254 THORCO LILY #LCBALE5460 4 CSCL YELLOW SEA #YMLUM2313 92972 BOMAR SPRING #YMLUM5150 68443 E.R. YOKOHAMA #MSCURK471 952 RIO BRAVO #SGL395446 CSCL YELLOW SEA #YMLUM2313 92980 RIO BRAVO #SGL392626 AF8625/06 AF6740/07 #05747880195 KL553/08 #07452400880 KL8440/09 KL8910/12 #07453010366 MS1534 MS521 #07796127872 MSC ALGECIRAS #MSCURK375 427

2016-10-15 2016-10-20

2016-10-14 2016-10-20

2016-10-30 2016-11-06

2016-10-30 2016-11-06

2016-11-09 2016-11-16

2016-12-14 21MB 2016-12-14 22MB

2016-12-02

2016-12-03

2016-12-06

2016-12-07

2016-12-11

2016-12-14 20MA

2016-12-05

2016-12-07

2016-12-07

2016-12-07

2016-12-12

2016-12-15 00; 00MA

2016-12-05

2016-12-05

2016-12-08

2016-12-08

2016-12-13

2016-12-15 00MA

2016-11-15

2016-11-16

2016-11-30

2016-12-01

2016-12-10

2016-12-17 00ABK; 10MA

2016-11-23

2016-11-23

2016-12-11

2016-12-11

2016-12-21

2016-12-17 00C ; 10MA ; 20PGB; 21MB ; 2x

2016-11-09

2016-11-09

2016-12-11

2016-12-11

2016-12-21

2016-12-17 31UHA

2016-12-13

2016-12-14

2016-12-15

2016-12-14

2016-12-20

2016-12-17 00EKH; 41MB

2016-10-15

2016-10-13

2016-11-03

2016-11-03

2016-11-13

2016-12-18 12UHA; 21UHA

2016-11-09

2016-11-09

2016-12-11

2016-12-11

2016-12-21

2016-12-18 22UHA

2016-11-10

2016-11-10

2016-12-11

2016-12-11

2016-12-21

2016-12-18 21UHA

2016-11-28

2016-11-29

2016-12-11

2016-12-11

2016-12-21

2016-12-18 11UHA

2016-11-30

2016-11-30

2016-12-10

2016-12-10

2016-12-20

2016-12-18 00URA

2016-11-09

2016-11-09

2016-12-11

2016-12-11

2016-12-21

2016-12-18 12UHA; 31UHA

2016-11-30

2016-11-30

2016-12-10

2016-12-10

2016-12-20

2016-12-19 21UHA

2016-12-04

2016-12-06

2016-12-15

2016-12-15

2016-12-20

2016-12-19 12UHA

2016-12-08

2016-12-08

2016-12-09

2016-12-09

2016-12-14

2016-12-19 11UHA

2016-12-09

2016-12-15

2016-12-15

2016-12-15

2016-12-20

2016-12-19 11UHA

2016-12-16

2016-12-16

2016-12-17

2016-12-17

2016-12-22

2016-12-19 00UEN

2016-11-23

2016-11-23

2016-12-11

2016-12-11

2016-12-21

2016-12-19 21UHA


4434 Sea

14

46080,00

4497 Sea

24

3086000,00

4593 Air

1

183,00

0 Kuala Lumpur CAIRO

4686 Air

1

420,00

0 Amsterdam

CAIRO

4721 Air

1

270,00

4 Amsterdam

CAIRO

4707 Air

2

677,00

3 Yilport

CAIRO

4714 Air

1

152,00

0 Shanghai

CAIRO

4720 Air

3

2571,00

6 Prag

CAIRO

4723 Air

2

1952,00

4 Frankfurt

CAIRO

4724 Air

5

333,30

2 Frankfurt

CAIRO

4718 Air

1

45,00

0 Milano

CAIRO

4542 Sea

6

38410,00

4531 Sea

6

11620,00

74 Santos

ALEXANDRIA

4648 Sea

10

27410,00

71 Gemlik

ALEXANDRIA

1

325,00

4537 Sea

13

137257,16

4606 Sea

2

12462,00

4639 Sea

35

41836,00

175 Hamburg

ALEXANDRIA

4754 Air

20

5364,33

27 Frankfurt

ALEXANDRIA

4615 Sea

2

23121,00

134 Shanghai

ALEXANDRIA

4704 Air

6

2362,37

7 Frankfurt

CAIRO

4733 Air

1

383,00

1 Frankfurt

CAIRO

4774 Air

38 Shanghai

6607 Ulsan

ALEXANDRIA

ALEXANDRIA

259 Laem Chabang ALEXANDRIA

1 Frankfurt

CAIRO

966 Laem Chabang ALEXANDRIA 92 Ho Chi Minh Port

ALEXANDRIA

HYUNDAI PRIDE #HLCUSHA160 8EATX1 DA HONG XIA #ULS-ALX4497 QR849/18 QR1301/20 #15702025866 AF8625/06 AF6740/07 #05747880206 MS1534/09 MS521/10 #07796127301 MS543/10 #07796091903 EK9873/11 #17634571110 RFS/14 MS537 #07792563693 TK6431 TK6468 #23562467521 KL8440 KL553 #07453010381 KL553 #07451682245 BBC NEW YORK #LAEALE001 MSC ARICA #MSCUZS873 025 MSC GIOVANNA #MSCURK439 710 MS1584 MS541 #07790881276 BBC NEW YORK #LAEALE002 YM IMAGE #YMLUM4903 01748 RIO BLANCO #SGL401687

2016-10-26

2016-10-28

2016-12-12

2016-12-12

2016-12-22

2016-12-20 00

2016-11-01

2016-11-01

2016-12-03

2016-12-03

2016-12-13

2016-12-20 12UHA

2016-11-19

2016-11-19

2016-11-23

2016-11-22

2016-11-28

2016-12-20 11UHA

2016-12-06

2016-12-06

2016-12-15

2016-12-15

2016-12-20

2016-12-20 00UEN

2016-12-09

2016-12-10

2016-12-10

2016-12-12

2016-12-15

2016-12-20 00UEN

2016-12-10

2016-12-10

2016-12-10

2016-12-10

2016-12-15

2016-12-20 41SGY

2016-12-11

2016-12-11

2016-12-12

2016-12-12

2016-12-17

2016-12-20 1x

2016-12-14

2016-12-14

2016-12-16

2016-12-16

2016-12-21

2016-12-20 42MB

2016-12-14

2016-12-14

2016-12-17

2016-12-17

2016-12-22

2016-12-20 11CYE

2016-12-15

2016-12-15

2016-12-17

2016-12-17

2016-12-22

2016-12-20 00; 00C ; 00MK ; 00UEN

2016-12-15

2016-12-17

2016-12-16

2016-12-17

2016-12-21

2016-12-20 00URA

2016-11-17

2016-11-16

2016-12-06

2016-12-06

2016-12-16

2016-12-20 22MBR

2016-11-01

2016-11-02

2016-12-10

2016-12-10

2016-12-20

2016-12-21 30URA

2016-11-25

2016-11-27

2016-12-10

2016-12-10

2016-12-20

2016-12-21 20

2017-12-17

2016-12-17

2016-12-17

2016-12-17

2016-12-22

2016-12-21 42MB

2016-11-17

2016-11-16

2016-12-06

2016-12-06

2016-12-16

2016-12-22 22UHA

2016-11-22

2016-11-23

2016-12-18

2016-12-15

2016-12-28

2016-12-22 12UHA

2016-12-07

2016-12-07

2016-12-17

2016-12-17

2016-12-27

MS541 #07790881265 COSCO HELLAS #YMLUM2313 96657 KL8440/09 MP8910/12 #07453010355 AF341M AF508 #05752956175

2016-12-18

2016-12-18

2016-12-18

2016-12-17

2016-12-23

2016-12-22 00C ; 10LCL; 10MA ; 12MKA; 20; 21; 22; 2x; 30MA ; 31UBA; 32UBA; 3x 2016-12-23 00

2016-11-16

2016-11-17

2016-12-18

2016-12-15

2016-12-28

2016-12-24 32UHA

2016-12-09

2016-12-15

2016-12-15

2016-12-15

2016-12-20

2016-12-24 00C ; 00EKH; 21MB ; 99BTA

2016-12-13

2016-12-21

2016-12-15

2016-12-21

2016-12-20

2016-12-24 00C


4716 Air

5

811,55

8 Frankfurt

4575 Sea

4

62789,60

268 Shanghai

ALEXANDRIA

3559 Sea

31

295,73

2 Hamburg

ALEXANDRIA CAIRO

4771 Air

CAIRO

1

480,00

3 Frankfurt

4605 Sea

73

81216,00

215 Shanghai

ALEXANDRIA

4604 Sea

1

12426,00

67 Chennai

ALEXANDRIA

4516 Sea

12

152885,41

4545 Sea

5

3357,00

4529 Sea

1

13758,00

4736 Air

7

1314,00

4632 Sea

2

27153,30

4705 Air

1

104,20

4627 Sea

8

8897,00

50 Hamburg

ALEXANDRIA

4533 Sea

85

117110,50

399 Hamburg

ALEXANDRIA

1

865,70

4548 Sea

17

24410,00

4571 Sea

35

299622,19

1075 Busan

ALEXANDRIA

4573 Sea

14

170896,30

937 Ulsan

ALEXANDRIA

4782 Air

1

0,50

0 Wien

CAIRO

4783 Air

1

15,00

0 D端sseldorf

CAIRO

4776 Air

1

0,15

0 Prag

CAIRO

3574 Air

1

5,02

0 D端sseldorf

CAIRO

4739 Air

803 Ulsan

ALEXANDRIA

13 Laem Chabang ALEXANDRIA 67 Ulsan 9 D端sseldorf 134 Shanghai

0 D端sseldorf

1 Genua 65 Ulsan

ALEXANDRIA CAIRO ALEXANDRIA

CAIRO

CAIRO ALEXANDRIA

KL8440 MP8910 #07453010370 COSCO HELLAS #YMLUM2313 92971 MSC ATHENS #MSCURK443 266 LH8290 #02099051116 COSCO HELLAS #YMLUM2313 95788 EURO MAX #YMLUM5150 68447 MSC MARGRIT #MSCUKU536 534 MSC CLAUDIA #MSCUW7106 492 MSC MARGRIT #MSCUKU536 716 MS1520 + MS541 #07790881280 GERDA MAERSK #MSCUYF3421 28 MS1520 + MS541 #07790881291 MSC ATHENS #MSCURK390 046 MSC ATHENS #MSCURK436 096 KL8800 MP8910 #07449682732 MSC MARGRIT #MSCUKU537 334 MSC EVA #MSCUKU543 753 MSC EVA #MSCUKU544 009 MS798/22 #07792596770 MS1520/22 MS541/23 #07790881302 LH1393 + LH8290 #02053562320 AF361/24 AF508/25 #05752956190

2016-12-16

2016-12-16

2016-12-19

2016-12-19

2016-12-24

2016-12-24 00UEN; 21UBA; 22UBA; 31MB ; 41MK

2016-11-16

2016-11-17

2016-12-18

2016-12-15

2016-12-28

2016-12-24 22UHA

2016-11-30

2016-11-30

2016-12-17

2016-12-17

2016-12-27

2016-12-24 00ABK; 10MKA; 11MK ; 12MKA; 20MKA

2016-12-20

2016-12-20

2016-12-20

2016-12-20

2016-12-25

2016-12-24 10PAB

2016-11-16

2016-11-17

2016-12-18

2016-12-15

2016-12-28

2016-12-25 40URA

2016-11-17

2016-11-17

2016-12-18

2016-12-15

2016-12-28

2016-12-25 11UHA

2016-11-06

2016-11-06

2016-12-16

2016-12-16

2016-12-26

2016-12-25 11UHA

2016-11-08

2016-11-09

2016-12-16

2016-12-16

2016-12-26

2016-12-25 12MBR

2016-11-06

2016-11-06

2016-12-16

2016-12-16

2016-12-26

2016-12-26 11UHA

2016-12-20

2016-12-21

2016-12-21

2016-12-21

2016-12-26

2016-12-26 00MK ; 42C ; 42MBR; 42MKA

2016-11-22

2016-11-22

2016-12-21

2016-12-21

2016-12-31

2016-12-27 12UHA

2016-12-20

2016-12-20

2016-12-23

2016-12-21

2016-12-28

2016-12-27 22MBR

2016-11-30

2016-11-30

2016-12-17

2016-12-17

2016-12-27

2016-12-28 12MBR

2016-11-30

2016-11-30

2016-12-17

2016-12-17

2016-12-27

2016-12-23

2016-12-23

2016-12-26

2016-12-26

2016-12-31

2016-12-28 10MA ; 11MK ; 12MKA; 1X; 20LBG; 20MA ; 20MKA; 2X; 30MA ; 40MA ; 4X 2016-12-28 00URA

2016-11-06

2016-11-06

2016-12-16

2016-12-16

2016-12-26

2016-12-28 10; 11; 12

2016-11-12

2016-11-13

2016-12-18

2016-12-18

2016-12-28

2016-12-28 00

2016-11-12

2016-11-13

2016-12-19

2016-12-18

2016-12-29

2016-12-28 21UHA

2016-12-22

2016-12-22

2016-12-22

2016-12-22

2016-12-27

2016-12-28 11CYE

2016-12-22

2016-12-22

2016-12-23

2016-12-22

2016-12-28

2016-12-28 00

2016-12-22

2016-12-22

2016-12-22

2016-12-22

2016-12-27

2016-12-28 41MB

2016-12-24

2016-12-23

2016-12-25

2016-12-26

2016-12-30

2016-12-28 32MB


4626 Sea

70

85908,00

116 Hamburg

ALEXANDRIA

4565 Sea

12

60642,00

102 Hamburg

ALEXANDRIA

4536 Sea

81

962450,81

4791 Air

1

1,10

4794 Air

1

980,00

4768 Air

10

4800 Air

4780 Air

4998 Laem Chabang ALEXANDRIA 0 Wien

CAIRO

1 Antwerpen

CAIRO

1817,08

7 Frankfurt

CAIRO

1

35,00

0 Frankfurt

CAIRO

1

55,00

0 Frankfurt

CAIRO

4560 Sea

30

27160,00

66 Busane

ALEXANDRIA

4607 Sea

3

35821,00

259 Hamburg

ALEXANDRIA

4603 Sea

3

28009,00

201 Shanghai

ALEXANDRIA

4643 Sea

59

74858,30

236 Hamburg

ALEXANDRIA

4808 Air

10

2894,50

4609 Sea

346

310705,00

766 Hamburg

ALEXANDRIA

4680 Sea

68

69551,40

129 Hamburg

ALEXANDRIA

4809 Air

1

243,83

1 Istanbul

CAIRO

4803 Air

1

185,00

1 Chennai

CAIRO

4807 Air

1

1,00

0 Prag

CAIRO

4798 Air

3

13770,00

8 Amsterdam

CAIRO

28 Abu Dhabi UAE

CAIRO

MSC ALGECIRAS #MSCURK410 364 MSC ATHENS #MSCURK437 003 BBC NEW YORK #LAEALE0003 MS798/24 #07792596825 MS1534/24 MS521/25 #07796384481 MS1520/27 MS541/28 #07790881324 MS1520/27 MS541/28 #07790881313 KL8440/23 KL553/26 #07453010403 HYUNDAI DRIVE #HLCUSEL161 104575 MSC CHLOE #MSCURK333 467 COSCO YANTIAN #YMLUM2314 00934 MSC CHLOE #MSCURK505 486 MS915/03 #07791730785 MSC BILBAO #MSCURK466 044 MSC BILBAO #MSCURK576 883

2016-11-23

2016-11-23

2016-12-17

2016-12-17

2016-12-27

2016-12-29 00

2016-11-30

2016-11-30

2016-12-17

2016-12-17

2016-12-27

2016-12-29 10MA

2016-11-17

2016-11-16

2016-12-06

2016-12-06

2016-12-16

2016-12-30 31UHA

2016-12-24

2016-12-24

2016-12-24

2016-12-24

2016-12-29

2017-01-02 99UBA

2016-12-24

2016-12-24

2016-12-25

2016-12-25

2016-12-30

2017-01-02 11UHA

2016-12-27

2016-12-27

2016-12-28

2016-12-28

2017-01-02

2017-01-02 00C ; 00EKH; 00URA; 10MKA; 22MB ; 41MK ; 42MB ; 42MKA; 99UBA

2016-12-27

2016-12-27

2016-12-28

2016-12-28

2017-01-02

2017-01-02 00CHA

2016-12-28

2016-12-28

2016-12-31

2016-12-31

2017-01-05

2017-01-02 00

2016-11-07

2016-11-07

2016-12-29

2016-12-29

2017-01-08

2017-01-03 00; 10; 11; 12

2016-12-07

2016-12-09

2016-12-28

2016-12-28

2017-01-07

2017-01-04 20UEN

2016-11-30

2016-11-30

2017-01-01

2017-01-01

2017-01-11

2017-01-06 32UHA

2016-12-07

2016-12-09

2016-12-28

2016-12-28

2017-01-07

2017-01-03

2017-01-03

2017-01-03

2017-01-04

2017-01-08

2017-01-06 00; 10; 10MA ; 11MK ; 12MKA; 1X; 1x; 20; 20MA ; 21; 22; 2X; 2x; 30; 3x; 40; 4x 2017-01-09 41MB

2016-12-14

2016-12-14

2017-01-03

2017-01-03

2017-01-13

2017-01-10 00

2016-12-14

2016-12-14

2017-01-03

2017-01-03

2017-01-13

TK0692/04 #23561151031 EY927/04 EY789/05 #60771870702 LH1393/06 LH586/07 #02053562364 MS1534/28 MS521/29 #07796384772

2017-01-04

2017-01-04

2017-01-04

2017-01-04

2017-01-09

2017-01-10 00; 00C ; 10EKH; 10MA ; 11; 12; 12MKA; 1X; 1x; 20MA ; 21; 22; 2X; 2x; 30MK ; 30MKA; 31; 32; 3x; 40URA; 4x 2017-01-10 10SGC

2017-01-04

2017-01-04

2017-01-05

2017-01-05

2017-01-10

2017-01-11 11UHA

2017-01-06

2017-01-06

2017-01-07

2017-01-07

2017-01-12

2017-01-11 42MB

2016-12-28

2016-12-28

2016-12-29

2016-12-29

2017-01-03

2017-01-11 22UHA


3576 Air

11

182,50

1 Frankfurt

CAIRO

3557 Air

5

22,31

0 Jakarta

CAIRO

3563 Air

17

108,00

0 Jakarta

CAIRO

4773 Air

2

2277,90

2 Düsseldorf

CAIRO

4681 Sea

12

62046,00

4734 Sea

1

21564,00

4668 Sea

12

89815,00

803 Hamburg

ALEXANDRIA

4613 Sea

24

99270,00

1045 Antwerpen

ALEXANDRIA

4614 Sea

16

32140,00

250 Antwerpen

ALEXANDRIA

4657 Sea

2

18888,00

134 Houston

ALEXANDRIA

4805 Air

4

106,50

0 Düsseldorf

4647 Sea

8

32940,00

347 Antwerpen

ALEXANDRIA

4601 Sea

2

12400,00

103 Antwerpen

ALEXANDRIA

4594 Sea

5

29396,00

150 Antwerpen

ALEXANDRIA

4597 Sea

4

71100,00

284 Antwerpen

ALEXANDRIA

4715 Sea

6

4400,00

38 Hamburg

ALEXANDRIA

4701 Sea

92

22713,00

251 Hamburg

ALEXANDRIA

4577 Sea

1

29900,00

140 Antwerpen

ALEXANDRIA

4706 Sea

3

2966,00

4719 Sea

5

88470,00

4826 Air

8

1172,40

4793 Air

1

9,00

0 Charlotte

CAIRO

3577 Air

1

4,60

0 Frankfurt

CAIRO

102 Hamburg 67 Rotterdam

11 Yilport 262 Nhava Sheva

11 Prag

ALEXANDRIA ALEXANDRIA

CAIRO

ALEXANDRIA ALEXANDRIA

CAIRO

KL8350/01 MP8910/02 #07453010414 TK057/30 TK694/31 #23562004316 TK057/30 TK694/31 #23562004401 KL8440/05 KL553/06 #07453010425 MSC BILBAO #MSCURK518 232 MSC MELISSA #MSCURK608 181 RIO MADEIRA #SGL403304 VECTIS HARRIER VECTIS HARRIER NEW DELHI EXPRESS #HLCUHOU16 1207708 AF431/06 AF508/08 #05752956223 VECTIS HARRIER VECTIS HARRIER VECTIS HARRIER VECTRIS HARRIER MSC PARIS #MSCURK578 277 MSC PARIS #MSCURK564 186 VECTIS HARRIER MSC JENNY #MSCURK590 579 LONG BEACH TRADER #YMLUM5020 00527 LH7431S/06 LH8290/08 #02053562375 AF639/08 #05748967472 AF341/13 AF570/14 #05752956245

2017-01-01

2017-01-02

2017-01-02

2017-01-02

2017-01-07

2017-01-11 00STG

2016-12-30

2016-12-30

2016-12-31

2017-01-01

2017-01-05

2017-01-11 10MA

2016-12-30

2016-12-30

2016-12-31

2017-01-01

2017-01-05

2017-01-11 20MA

2017-01-05

2017-01-05

2017-01-07

2017-01-07

2017-01-12

2017-01-11 12MBR

2016-12-14

2016-12-14

2017-01-03

2017-01-03

2017-01-13

2017-01-12 20MA

2016-12-19

2016-12-20

2017-01-03

2017-01-03

2017-01-13

2017-01-12 11UHA

2016-12-21

2016-12-21

2017-01-01

2017-01-01

2017-01-11

2017-01-13 12UHA

2016-12-05

2016-12-06

2016-12-19

2016-12-20

2016-12-29

2017-01-14 00

2016-12-05

2016-12-06

2016-12-19

2016-12-20

2016-12-29

2017-01-14 00

2016-12-10

2016-12-12

2017-01-05

2017-01-05

2017-01-15

2017-01-14 11UHA; 21UHA

2017-01-06

2017-01-06

2017-01-08

2017-01-08

2017-01-13

2017-01-14 00; 41MB ; 41MK

2016-12-05

2016-12-06

2016-12-19

2016-12-20

2016-12-29

2017-01-15 00

2016-12-05

2016-12-06

2016-12-19

2016-12-20

2016-12-29

2017-01-15 11MBR; 12MBR

2016-12-06

2016-12-06

2016-12-19

2016-12-20

2016-12-29

2017-01-15 10MA

2016-12-09

2016-12-06

2016-12-19

2016-12-20

2016-12-29

2017-01-15 20UEN

2016-12-21

2016-12-23

2017-01-10

2017-01-10

2017-01-20

2017-01-15 11MBR; 12MBR

2016-12-21

2016-12-23

2017-01-10

2017-01-10

2017-01-20

2017-01-15 00

2016-12-05

2016-12-06

2016-12-19

2016-12-20

2016-12-29

2017-01-15 10EKH

2016-12-18

2016-12-25

2017-01-05

2017-01-07

2017-01-15

2017-01-16 10SGC; 11SGC; 20SGC

2016-12-23

2016-12-30

2017-02-23

2017-02-25

2017-03-05

2017-01-16 00

2017-01-06

2017-01-06

2017-01-09

2017-01-09

2017-01-14

2017-01-16 41MB

2017-01-08

2017-01-08

2017-01-10

2017-01-10

2017-01-15

2017-01-16 42MKA

2017-01-13

2017-01-13

2017-01-15

2017-01-15

2017-01-20

2017-01-16 32MB


4824 Air

1

85,00

0 Düsseldorf

CAIRO

4755 Sea

1

2770,00

6 Izmir

ALEXANDRIA

4792 Air

1

645,00

6 Wien

CAIRO

4466 Sea

5

85493,10

339 Shanghai

ALEXANDRIA

4424 Sea

5

85643,10

350 Shanghai

ALEXANDRIA

4696 Sea

678

235157,20

2041 Hamburg

ALEXANDRIA

4641 Sea

6

19000,00

153 Hamburg

ALEXANDRIA

4669 Sea

2

9845,00

42 Antwerpen

ALEXANDRIA

4731 Sea

1

7000,00

35 Antwerpen

ALEXANDRIA

4566 Sea

4

74655,39

4801 Air

2

13540,00

4621 Sea

4

64690,00

283 Antwerpen

ALEXANDRIA

4672 Sea

16

9460,00

18 Shanghai

ALEXANDRIA

4864 Air

6

687,00

3 Frankfurt

CAIRO

4819 Air

3

30,80

0 Düsseldorf

CAIRO

4851 Air

1

105,00

1 Düsseldorf

CAIRO

4622 Sea

6

95967,67

315 Nhava Sheva

ALEXANDRIA

4623 Sea

4

71365,00

210 Nhava Sheva

ALEXANDRIA

4697 Sea

2

44660,00

175 Antwerpen

ALEXANDRIA

4850 Air

1

40,00

210 Nhava Sheva 28 Incheon

0 Frankfurt

ALEXANDRIA CAIRO

CAIRO

AF341/11 AF570/13 #05752956234 MSC ISABELLE #MSCURK640 671

2017-01-11

2017-01-11

2017-01-13

2017-01-13

2017-01-18

2017-01-17 00

2016-12-28

2016-12-28

2017-01-11

2017-01-11

2017-01-21

2017-01-17 00URA

MS9537T/11 MS541/13 #07792596862 AMBER BEVERLY #AB1604SHAL X003 AMBER BEVERLY #AB1604SHAL X004 MSC PARIS #MSCURK542 299 MSC PARIS #MSCURK467 125 NOMADIC BERGEN #010 NOMADIC BERGEN #009 MALLECO #YMLUM5020 00507 CV6916/07 CV8501/09 #17219341420 NOMADIC BERGEN #008 COSCO AFRICA #YMLUM2314 04809 MS1520/13 MS541/15 #07790881372 MS1520/13 MS541/14 #07790881350 AF341/13 AF570/14 #05752956260 CONTI CANBERRA #YMLUM5020 00510 CONTI CANBERRA #YMLUM5020 00520 NOMADIC BERGEN #007 MS1520/13 MS541/14 #07790881361

2017-01-11

2017-01-11

2017-01-13

2017-01-13

2017-01-18

2017-01-17 00UEN

2016-10-31

2016-11-08

2017-01-02

2017-01-02

2017-01-12

2017-01-18 12UHA

2016-11-08

2016-11-08

2017-01-02

2017-01-02

2017-01-12

2017-01-18 21UHA

2016-12-21

2016-12-23

2017-01-10

2017-01-10

2017-01-20

2017-01-18 00

2016-12-21

2016-12-23

2017-01-11

2017-01-11

2017-01-21

2017-01-18 12UHA

2016-12-22

2016-12-23

2017-01-06

2017-01-07

2017-01-16

2017-01-18 11MKC

2016-12-22

2016-12-23

2017-01-06

2017-01-07

2017-01-16

2017-01-18 21MK

2016-10-31

2016-11-16

2017-01-12

2017-01-12

2017-01-22

2017-01-18 00

2017-01-07

2017-01-07

2017-01-10

2017-01-10

2017-01-15

2017-01-18 00

2016-12-22

2016-12-23

2017-01-06

2017-01-07

2017-01-16

2017-01-19 11XKA; 21XKA

2016-12-07

2016-12-07

2017-01-12

2017-01-12

2017-01-22

2017-01-20 2x

2017-01-13

2017-01-13

2017-01-15

2017-01-14

2017-01-20

2017-01-20 20MA

2017-01-13

2017-01-13

2017-01-14

2017-01-14

2017-01-19

2017-01-20 00C ; 31MB ; 41MB

2017-01-13

2017-01-13

2017-01-14

2017-01-15

2017-01-19

2017-01-20 11BAT

2016-11-28

2016-11-26

2017-01-15

2017-01-15

2017-01-25

2017-01-21 00

2016-11-28

2016-11-26

2017-01-15

2017-01-15

2017-01-25

2017-01-21 00

2016-12-22

2016-12-23

2017-01-06

2017-01-07

2017-01-16

2017-01-21 10EKH

2017-01-13

2017-01-13

2017-01-14

2017-01-14

2017-01-19

2017-01-21 42MBR


4671 Sea

2

23321,00

134 Shanghai

ALEXANDRIA

4675 Sea

12

165135,28

803 Shanghai

ALEXANDRIA

4691 Sea

2

31545,10

138 Shanghai

ALEXANDRIA

4673 Sea

5

29396,00

150 Antwerpen

ALEXANDRIA

4711 Sea

2

10010,00

43 Antwerpen

ALEXANDRIA

4818 Air

2

485,00

4 Malmö

CAIRO

4829 Air

1

104,20

0 Düsseldorf

CAIRO

4835 Air

2

17660,00

4656 Sea

1

10219,70

2936 Sea

1

2,55

0 Rotterdam

BURULLUS

4767 Sea

1

395000,00

240 Rotterdam

BURULLUS

2933 Sea

1

2,55

0 Rotterdam

BURULLUS

4547 Sea

1

395200,00

240 Rotterdam

BURULLUS

4646 Sea

4

62889,60

268 Shanghai

ALEXANDRIA

4663 Sea

3

28129,00

201 Shanghai

ALEXANDRIA

4652 Sea

4

52418,00

268 Shanghai

ALEXANDRIA

4650 Sea

2

12462,00

92 Ho Chi Minh Port

ALEXANDRIA

4599 Sea

6

26480,00

29 Ulsan

ALEXANDRIA

4687 Sea

2

157782,00

461 Banten

ALEXANDRIA

4740 Sea

2

18140,00

104 Hamburg

ALEXANDRIA

4726 Sea

3

227000,00

298 Am 3. May Shipyard

BURULLUS

254 Qingdao 76 Shanghai

CAIRO ALEXANDRIA

COSCO AFRICA #YMLUM2314 05026 COSCO AFRICA #YMLUM2314 04804 COSCO AFRICA #YMLUM2314 04805 NOMADIC BERGEN #006 NOMADIC BERGEN #005 KL8160/12 MP8140/16 #07450139740 AF341/13 AF570/14 #05752956256 VDA4558/21 #41201483510 COSCO AFRICA #YMLUM2314 04807 HOHE BANK #HOHE-ROTBUR-1B HOHE BANK #HOHE-ROTBUR-1A HOHE BANK #HOHE-ROTBUR-2B HOHE BANK #HOHE-ROTBUR-2A COSCO AFRICA #YMLUM2314 04806 COSCO AFRICA #YMLUM2314 04440 COSCO AFRICA #YMLUM2314 03683 YM IMAGE #YMLUM4903 01932 DA AN #ULSALX-4599 BBC ORINOCO #BANALE-001 MSC CHARLESTON #MSCURK638 287 SCHILLIG #SCHIL-RIJBUR-1

2016-12-07

2016-12-07

2017-01-12

2017-01-12

2017-01-22

2017-01-22 42UHA

2016-12-07

2016-12-07

2017-01-12

2017-01-12

2017-01-22

2017-01-22 11UHA

2016-12-09

2016-12-07

2017-01-12

2017-01-12

2017-01-22

2017-01-22 11UHA

2016-12-23

2016-12-23

2017-01-06

2017-01-07

2017-01-16

2017-01-22 20MA

2016-12-31

2016-12-23

2017-01-06

2017-01-07

2017-01-16

2017-01-22 10MKC

2017-01-12

2017-01-12

2017-01-16

2017-01-16

2017-01-21

2017-01-22 20PUR

2017-01-13

2017-01-13

2017-01-14

2017-01-15

2017-01-19

2017-01-22 12MBR

2017-01-21

2017-01-21

2017-01-22

2017-01-22

2017-01-27

2017-01-22 11MBL; 12MBL

2016-12-07

2016-12-07

2017-01-12

2017-01-12

2017-01-22

2017-01-22 31UHA

2017-01-06

2017-01-06

2017-01-22

2017-01-22

2017-02-01

2017-01-22 11MK

2017-01-06

2017-01-06

2017-01-22

2017-01-22

2017-02-01

2017-01-22 11MK

2017-01-06

2017-01-06

2017-01-22

2017-01-22

2017-02-01

2017-01-22 20MK

2017-01-06

2017-01-06

2017-01-22

2017-01-22

2017-02-01

2017-01-22 20MK

2016-12-07

2016-12-07

2017-01-12

2017-01-12

2017-01-22

2017-01-23 31UHA

2016-12-07

2016-12-07

2017-01-12

2017-01-12

2017-01-22

2017-01-23 41UHA

2016-12-07

2016-12-07

2017-01-12

2017-01-12

2017-01-22

2017-01-23 22UHA

2016-12-06

2016-12-06

2017-01-18

2017-01-18

2017-01-28

2017-01-24 22UHA

2016-12-11

2016-12-08

2017-01-17

2017-01-17

2017-01-27

2017-01-24 22UHA

2016-12-16

2016-12-20

2017-01-14

2017-01-13

2017-01-24

2017-01-24 30MA

2016-12-28

2016-12-28

2017-01-16

2017-01-16

2017-01-26

2017-01-24 00ABK

2017-01-10

2017-01-10

2017-01-24

2017-01-24

2017-02-03

2017-01-24 10BAT


4756 Sea

11

19699,00

220 Hamburg

ALEXANDRIA

4764 Sea

1

6136,00

38 Hamburg

ALEXANDRIA

4765 Sea

1

9835,00

77 Hamburg

ALEXANDRIA

35

143,45

4635 Sea

4

367000,00

630 Rotterdam

BURULLUS

4713 Sea

3

53900,00

90 Rotterdam

BURULLUS

4865 Air

2

7,88

0 Frankfurt

CAIRO

4883 Air

1

72,00

1 Frankfurt

CAIRO

4888 Air

7

976,00

5 Frankfurt

CAIRO

4875 Air

1

0,73

0 Prag

CAIRO

4889 Air

1

0,60

0 Frankfurt

CAIRO

2940 Air

1

3,00

0 Frankfurt

CAIRO

4670 Sea

6

11730,00

75 Santos

ALEXANDRIA

4695 Sea

64

81817,00

318 Hamburg

ALEXANDRIA

4633 Sea

17

24450,00

67 Busan

ALEXANDRIA

4634 Sea

11

154695,70

736 Busan

ALEXANDRIA

4654 Sea

2

23121,00

134 Shanghai

ALEXANDRIA

4884 Air

2

1460,00

10 Frankfurt

CAIRO

4689 Sea

1

8811,00

67 Busan

ALEXANDRIA

4651 Sea

26

234717,84

829 Busan

ALEXANDRIA

3569 Air

1 Jakarta

CAIRO

MSC CHARLESTON #MSCURK651 025 MSC CHARLESTON #MSCURK652 445 MSC CHARLESTON #MSCURK652 163 TK057/18 TK694/19 #23564428674 HOHE BANK #HOHE-ROTBUR-3 HOHE BANK #HOHE-ROTBUR-4 MS1520/20 MS541/21 #07790881383 AF341/20 AF570/21 #05752956271 MS1520/20 MS541/21 #07790881405 LH1397/20 LH8290/20 #02053562460 MS732/21 #07796229420 MS1520/20 MS541/21 #07796229416 MSC AMALFI #MSCUZS915 362 MSC CHARLESTON #MSCURK621 358 MSC GAIA #MSCUKU566 911 MSC RENEE #MSCUKU560 153 COSCO AMERICA # MS541/22 #07790881394 MSC CLORINDA #MSCUKU575 466 MSC CLORINDA #MSCUKU575 524

2016-12-28

2016-12-28

2017-01-16

2017-01-16

2017-01-26

2017-01-24 00

2016-12-28

2016-12-28

2017-01-16

2017-01-16

2017-01-26

2017-01-24 40URA

2016-12-28

2016-12-28

2017-01-16

2017-01-16

2017-01-26

2017-01-24 10EKH

2017-01-19

2017-01-19

2017-01-20

2017-01-20

2017-01-25

2017-01-24 30MA ; 40MA

2017-01-06

2017-01-06

2017-01-22

2017-01-22

2017-02-01

2017-01-25 10MA

2017-01-06

2017-01-06

2017-01-22

2017-01-22

2017-02-01

2017-01-25 10MA

2017-01-20

2017-01-20

2017-01-21

2017-01-22

2017-01-26

2017-01-25 22MB ; 32MB

2017-01-20

2017-01-20

2017-01-21

2017-01-21

2017-01-26

2017-01-25 22BAT

2017-01-20

2017-01-20

2017-01-21

2017-01-21

2017-01-26

2017-01-25 10MA

2017-01-20

2017-01-20

2017-01-21

2017-01-21

2017-01-26

2017-01-25 42MB

2017-01-21

2017-01-21

2017-01-21

2017-01-21

2017-01-26

2017-01-25 42MB

2017-01-20

2017-01-20

2017-01-21

2017-01-22

2017-01-26

2017-01-25 00MB

2016-12-07

2016-12-08

2017-01-10

2017-01-10

2017-01-20

2017-01-26 40URA

2016-12-18

2016-12-28

2017-01-16

2017-01-16

2017-01-26

2016-12-04

2016-12-04

2017-01-11

2017-01-11

2017-01-21

2017-01-26 00; 12; 2X; 32; 2017-01-27 20;

2016-11-27

2016-11-28

2017-01-11

2017-01-11

2017-01-21

2017-01-28 12UHA

2016-12-14

2016-12-14

2017-01-18

2017-01-18

2017-01-28

2017-01-28 41UHA

2017-01-22

2017-01-22

2017-01-22

2017-01-22

2017-01-27

2017-01-28 00EKH

2016-12-11

2016-12-11

2017-01-19

2017-01-19

2017-01-29

2017-01-29 12UHA

2016-12-11

2016-12-11

2017-01-19

2017-01-19

2017-01-29

2017-01-29 00

10BFT; 10MA ; 11; 11MK ; 12MKA; 1X; 20MA ; 21; 22; 2x; 30MKA; 30PGB; 31; 40PGB; 41; 42 21; 22


4812 Air

2

644,00

3 Denver

CAIRO

4886 Air

1

12,30

0 Frankfurt

CAIRO

4628 Sea

4

7476,00

4665 Sea

29

27180,00

4640 Sea

2

7108,00

4735 Sea

74

85802,20

451 Hamburg

ALEXANDRIA

4728 Sea

25

37029,00

246 Hamburg

ALEXANDRIA

4772 Sea

4

3762,00

19 Hamburg

ALEXANDRIA

4855 Air 4732 Sea

1 30

2000,00 8342,00

9 Frankfurt 22 Rotterdam

Cairo ALEXANDRIA

4882 Air

9

372,50

2 Frankfurt

CAIRO

4890 Air

1

2160,00

8 Frankfurt

CAIRO

4894 Air 4693 Air

3 4

159,00 1038,40

1 Frankfurt 6 Mumbai

Cairo CAIRO

4909 Air

1

260,00

1 Frankfurt

CAIRO

4683 Air 4859 Air

1 4

33,00 169,00

0 Hamburg 0 Düsseldorf

Cairo CAIRO

4847 Air

7

2428,00

5 Shanghai

CAIRO

4677 Sea

17

104665,25

4550 Sea

2

28033,30

4758 Sea

1

9444,00

57 Nhava Sheva

ALEXANDRIA

66 Busan

ALEXANDRIA

56 Nhava Sheva

ALEXANDRIA

398 Busan

ALEXANDRIA

134 Shanghai

ALEXANDRIA

67 Houston

ALEXANDRIA

KL612/20 MP8140/26 #07448921515 MS1520/24 MS541/25 #07796229431 MAERSK EUPHRATES #MAEU958809 563 MSC CLORINDA #MSCUKU575 490 MAERSK EUPHRATES #MAEU958809 563 MSC ANTIGUA #MSCURK690 056

2017-01-20

2017-01-20

2017-01-26

2017-01-26

2017-01-31

2017-01-29 11MB ; 12MB

2017-01-24

2017-01-24

2017-01-25

2017-01-25

2017-01-30

2017-01-29 22BAT

2016-11-18

2016-12-22

2017-01-14

2017-01-14

2017-01-24

2017-01-30 00

2016-12-11

2016-12-11

2017-01-19

2017-01-19

2017-01-29

2017-01-30 20; 21; 22

2016-12-22

2016-12-22

2017-01-15

2017-01-15

2017-01-25

2017-01-30 00

2017-01-04

2017-01-04

2017-01-23

2017-01-22

2017-02-02

MSC ANTIGUA #MSCURK642 651 MSC ANTIGUA #MSCURK664 515 MP8140/19 MSC ANTIGUA #MSCURK668 193 AF341M/26 AF570/27 #05752956304 KL8440/27 MP8910/30 #07453010473 MS9000/27 KU302/28 KU541/29 #22947981500 MS541/28 #07796229442 LH8290/31 TK1952/22 TK690/23 #23526905336 QR0871/28 QR1301/29 #15703881360 MSC LIVORNO #MSCUKU603 060 CSCL WINTER #YMLUM2313 87952 KOBE EXPRESS #HLCUHOU16 1260371

2017-01-04

2017-01-04

2017-01-23

2017-01-22

2017-02-02

2017-01-31 00C ; 01LD ; 10; 10EKH; 10LAC; 10LD ; 10MA ; 11; 11BBT; 11MK ; 12; 12MKA; 20MA ; 21; 21C ; 22; 3x 2017-01-31 00ABK; 01LD ; 10LCA; 10MA ; 11MK ; 12MB ; 12MKA; 2X

2017-01-04

2017-01-04

2017-01-23

2017-01-22

2017-02-02

2017-01-31 11MB ; 12MB

2017-01-18 2017-01-04

2017-01-04

2017-01-19 2017-01-23

2017-01-22

2017-02-02

2017-01-31 00ABA 2017-02-01 00; 10; 11; 12; 20; 21; 22

2017-01-26

2017-01-26

2017-01-30

2017-01-30

2017-02-04

2017-02-02 00EKH; 00UEN; 10C ; 11UBA; 12MB ; 42BAA; 42MPB

2017-01-27

2017-01-27

2017-01-30

2017-01-30

2017-02-04

2017-02-02 00EKH

2017-01-27 2017-01-28

2017-01-28

2017-01-27 2017-01-29

2017-01-29

2017-02-03

2017-02-02 00ABA 2017-02-02 00URA

2017-01-28

2017-01-28

2017-01-28

2017-01-28

2017-02-02

2017-02-02 00EKH

2017-01-31 2017-01-22

2017-01-22

2017-01-31 2017-01-26

2017-01-26

2017-01-31

2017-02-02 99UBA 2017-02-02 11UHA

2017-01-28

2017-01-28

2017-01-29

2017-01-29

2017-02-03

2017-02-02 00; 2x

2016-12-19

2016-12-18

2017-01-28

2017-01-25

2017-02-07

2017-02-03 00

2016-10-26

2016-10-26

2016-11-22

2016-11-22

2016-12-06

2017-02-03 11UHA

2017-01-02

2017-01-04

2017-01-29

2017-01-29

2017-02-08

2017-02-03 12UHA


4439 Sea

58

443768,69

6107 Shanghai

ALEXANDRIA

4725 Sea

2

27379,12

134 Shanghai

ALEXANDRIA

4870 Sea

6

7603,01

49 Rijeka

BURULLUS

4744 Sea

3

2357,00

20 Hamburg

ALEXANDRIA

3575 Sea

2

1040,00

3 Hamburg

ALEXANDRIA

3578 Sea

1

35,65

0 Rijeka

ALEXANDRIA

4779 Sea

39

36813,00

108 Hamburg

ALEXANDRIA

4845 Sea

6

127822,04

230 Hamburg

ALEXANDRIA

4631 Sea

2

43727,99

40 Mumbai

ALEXANDRIA

4688 Sea

14

25460,00

4910 Air

1

20,00

0 Düsseldorf

CAIRO

4903 Air

1

66,90

0 Düsseldorf

CAIRO

3581 Air

1

13,90

0 Frankfurt

CAIRO

4630 Sea

6

144987,00

643 Banten

ALEXANDRIA

4692 Sea

9

133774,83

622 Shanghai

ALEXANDRIA

4676 Sea

5

62519,75

335 Shanghai

ALEXANDRIA

4763 Sea

9

10907,79

4899 Air

15

4896 Air

229 Nhava Sheva

ALEXANDRIA

49 Rijeka

ALEXANDRIA

4397,63

31 Frankfurt

CAIRO

1

68,00

0 Frankfurt

CAIRO

4710 Sea

14

6078,00

4727 Sea

2

10400,00

19 Chennai

ALEXANDRIA

95 Hamburg

ALEXANDRIA

AROMA 2 #AM1601QDA LX01 CSCL BOHAI SEA #YMLUM2314 10221 ALTAIR MAERSK #SGL417274 MSC ALTAMIRA #MSCURK641 869 MSC ALTAMIRA #MSCURK754 431 ALTAIR MAERSK #SGL417274 RIO DE LA PLATA #SEJJSGL418 646 RIO DE LA PLATA #SGL419074 YM GREEN #YMLUM5020 00513 MEHUIN #AMC0516818

2016-11-28

2016-11-30

2017-01-25

2017-01-22

2017-02-04

2017-02-04 21MBL; 22MBL

2016-12-21

2016-12-22

2017-01-25

2017-01-25

2017-02-04

2017-02-04 22UHA

2017-01-14

2017-01-14

2017-02-25

2017-01-26

2017-03-07

2017-02-04 10BAT

2017-01-11

2017-01-12

2017-01-28

2017-01-28

2017-02-07

2017-02-04 12MBR

2017-01-11

2017-01-12

2017-01-28

2017-01-28

2017-02-07

2017-02-04 11MBL; 12MBL

2017-01-14

2017-01-14

2017-01-28

2017-01-26

2017-02-07

2017-02-04 10BAT

2017-01-18

2017-01-18

2017-01-28

2017-01-29

2017-02-07

2017-02-04 10MA ; 12MKA; 1X; 20; 20MA ; 21; 22; 2X; 31; 32; 3X; 3x

2017-01-18

2017-01-18

2017-01-28

2017-01-29

2017-02-07

2017-02-04 10BAT; 20BAT

2016-11-30

2016-12-02

2017-01-25

2017-01-25

2017-02-04

2017-02-05 00

2017-01-02

2017-01-04

2017-01-24

2017-01-24

2017-02-03

2017-02-05 30URA

AF341/30 AF670/31 #05752956326 MS1520/31 MS541/01 #07796229464 AF341/30 AF6740/01 #05752956315 BBC ORINOCO #BANALE-002 EVER UBERTY #YMLUM2314 08405 EVER UBERTY #YMLUM2314 08404 GUSTAV MAERSK #SGL417252 KL8440/03 MP8910/06 #07453010506 EK0393/04 EK0925/05 #17632227366 CMA CGM PUCCINI #AIS0207390 IMMENSITY #014

2017-01-30

2017-01-30

2017-02-01

2017-02-06

2017-02-05 00UEN

2017-01-31

2017-01-31

2017-02-01

2017-02-06

2017-02-05 42MBR

2017-02-07

2017-02-05 00C

2017-01-30

2017-02-01

2017-02-02

2016-12-12

2016-12-20

2017-01-12

2017-01-14

2017-01-22

2017-02-06 20MA

2016-12-14

2016-12-19

2017-02-04

2017-02-04

2017-02-14

2017-02-07 21UHA

2016-12-18

2016-12-19

2017-02-04

2017-02-04

2017-02-14

2017-02-07 21UHA

2017-01-08

2017-01-08

2017-01-26

2017-01-26

2017-02-05

2017-02-07 10BAT

2017-02-03

2017-02-03

2017-02-06

2017-02-06

2017-02-11

2017-02-08 00; 01LD ; 30MKA; 41MK ; 42MB ; 42MKA

2017-02-04

2017-02-04

2017-02-05

2017-02-05

2017-02-10

2017-02-08 42MBR

2017-01-11

2017-01-15

2017-02-07

2017-02-04

2017-02-17

2017-02-09 12UHA; 22UHA

2017-01-14

2017-01-14

2017-01-28

2017-01-31

2017-02-07

2017-02-09 00STG


2937 Sea

1

2,55

0 Blexen

BURULLUS

4839 Sea

1

395200,00

240 Blexen

BURULLUS

2938 Sea

6

7,39

0 Blexen

BURULLUS

2939 Sea

9

29527,61

44 Blexen

BURULLUS

4838 Sea

1

451255,00

441 Blexen

BURULLUS

4745 Sea

2

7250,00

4717 Sea

16

57260,00

87 Antwerpen

3573 Sea

2

134,60

4747 Sea

3

20820,00

4598 Sea

24

3086000,00

4684 Sea

8

13915,19

4757 Sea

6

96289,00

232 Antwerpen

ALEXANDRIA

4702 Sea

4

40253,60

461 Shanghai

ALEXANDRIA

4585 Sea

5

85493,10

339 Shanghai

ALEXANDRIA

4624 Sea

5

85493,10

339 Shanghai

ALEXANDRIA

4751 Sea

3

28249,00

201 Shanghai

ALEXANDRIA

4778 Sea

4

52433,00

268 Shanghai

ALEXANDRIA

4750 Sea

4

62929,60

268 Shanghai

ALEXANDRIA

4746 Sea 4777 Sea

24 75

100162,00 124944,00

367 Antwerpen 536 Hamburg

ALEXANDRIA ALEXANDRIA

4685 Sea

8

13915,19

4682 Sea

81

962450,81

4995 Laem Chabang ALEXANDRIA

4678 Sea

13

137257,16

969 Laem Chabang ALEXANDRIA

211 Chennai

1 Hamburg

42 Busan 6481 Ulsan 26 Chennai

26 Chennai

ALEXANDRIA ALEXANDRIA

ALEXANDRIA

ALEXANDRIA ALEXANDRIA ALEXANDRIA

ALEXANDRIA

ACCUM #ACCU-BLEBUR-2B ACCUM #ACCU-BLEBUR-2A ACCUM #ACCU-BLEBUR-1B ACCUM #ACCU-BLEBUR-1C ACCUM #ACCU-BLEBUR-1A IMMENSITY #012 MAERSK BENTONVILLE #SAFM769410 544 MSC TORONTO #MSCURK755 438 GERD MAERSK #959005177 DA AN #ULSALX-4598 WAN HAI 508 #YMLUM5150 68470 IMMENSITY #009 AROMA 2 #AM1601QDA LX01 INDUSTRIAL CAPE #IDMC112042 001 INDUSTRIAL CAPE #IDMC112042 002 COSCO TAICANG #YMLUM2314 12538 ITAL UNIVERSO #YMLUM2314 16111 ITAL UNIVERSO #YMLUM2314 17267 IMMENSITY # MSC TORONTO #MSCURK681 105 WAN HAI 508 #YMLUM5150 68471 BBC ORINOCO #LAEALE002 BBC ORINOCO #LAEALE001

2017-01-23

2017-01-24

2017-02-09

2017-02-09

2017-02-19

2017-02-09 12MKA

2017-01-24

2017-01-24

2017-02-09

2017-02-09

2017-02-19

2017-02-09 12MKA

2017-01-24

2017-01-24

2017-02-09

2017-02-09

2017-02-19

2017-02-09 12MB

2017-01-24

2017-01-24

2017-02-09

2017-02-09

2017-02-19

2017-02-09 12MB

2017-01-25

2017-01-24

2017-02-09

2017-02-09

2017-02-19

2017-02-09 12MB

2017-01-14

2017-01-14

2017-01-28

2017-01-31

2017-02-07

2017-02-09 10QU

2016-12-30

2017-01-01

2017-01-26

2017-01-26

2017-02-05

2017-02-10 11BAT; 12BAT

2017-01-18

2017-01-18

2017-02-05

2017-02-05

2017-02-15

2017-02-10 10BAA

2017-01-01

2017-01-01

2017-02-02

2017-02-02

2017-02-12

2017-02-10 10LCB

2016-12-03

2016-12-08

2017-01-17

2017-01-12

2017-01-27

2017-02-12 22UHA

2016-12-08

2016-12-19

2017-02-06

2017-02-06

2017-02-16

2017-02-12 12UHA

2017-01-14

2017-01-14

2017-01-28

2017-01-31

2017-02-07

2017-02-12 00ABK

2016-12-06

2016-11-30

2017-02-08

2017-02-08

2017-02-18

2017-02-13 21MBL; 22MBL

2016-12-17

2016-12-19

2017-01-30

2017-01-29

2017-02-09

2017-02-13 22UHA

2016-12-18

2016-12-19

2017-01-30

2017-01-29

2017-02-09

2017-02-13 31UHA

2016-12-28

2016-12-28

2017-02-06

2017-02-06

2017-02-16

2017-02-13 42UHA

2017-01-09

2017-01-09

2017-02-06

2017-02-06

2017-02-16

2017-02-13 31UHA

2017-01-09

2017-01-09

2017-02-06

2017-02-06

2017-02-16

2017-02-13 32UHA

2017-01-14 2017-01-18

2017-01-14 2017-01-18

2017-01-28 2017-02-04

2017-01-31 2017-02-05

2017-02-07 2017-02-14

2017-02-13 10LAC; 10PAC; 40 2017-02-13 00; 20MA ; 40URA

2016-12-08

2016-12-19

2017-02-06

2017-02-06

2017-02-16

2017-02-14 22UHA

2016-12-12

2016-12-12

2017-01-12

2017-01-14

2017-01-22

2017-02-14 32UHA

2016-12-12

2016-12-12

2017-01-12

2017-01-14

2017-01-22

2017-02-14 31UHA


4741 Sea

3

68517,00

104 Tianjin

ALEXANDRIA

4737 Sea

8

58021,86

254 Busan

ALEXANDRIA

4813 Sea

2

8200,00

46 Hamburg

ALEXANDRIA

4822 Sea

14

6181,00

19 Chennai

DAMIETTA

4895 Air

9

882,30

4 Frankfurt

4770 Sea

7

112835,80

469 Shanghai

ALEXANDRIA

4785 Sea

60

61406,30

296 Hamburg

ALEXANDRIA

4766 Sea

8

13915,19

27 Chennai

DAMIETTA

4781 Sea

8

13915,19

27 Chennai

DAMIETTA

4944 Air

1

18,00

4674 Sea

11

211594,00

803 Banten

ALEXANDRIA

4760 Sea

5

19260,84

74 Busan

ALEXANDRIA

4749 Sea

1

10059,70

76 Shanghai

ALEXANDRIA

4730 Sea

5

41246,40

335 Shanghai

ALEXANDRIA

4837 Sea

803 Hamburg

ALEXANDRIA

12

89275,00

4926 Air

2

2,65

3582 Air

2

376,00

4659 Sea

7

160148,00

4821 Sea

3

4761 Sea 4830 Sea

0 Düsseldorf

CAIRO

CAIRO

0 Prag

CAIRO

2 Amsterdam

CAIRO

230 Tianjin

ALEXANDRIA

41036,00

201 Rotterdam

ALEXANDRIA

39

22669,00

309 Hamburg

ALEXANDRIA

2

157782,00

461 Banten

ALEXANDRIA

CSCL MERCURY #COSU612835 9690 MSC TERESA #MSCUKU611 311 MSC TORONTO #MSCURK744 358 CMA CGM MOZART #AAK0119509 KL4080/30 MP8140/02 #07453010484 COSCO EUROPE #YMLUM2314 15665 MSC TORONTO #MSCURK775 311 CMA CGM MOZART #AAK0119535 CMA CGM MOZART #AAK0119535 OS710/09 OS683/10 #02053562574 BBC ORINOCO #BANALE-003 MSC AURORA #MSCUKU619 611 COSCO EUROPE #YMLUM2314 15646 EVER UNICORN #YMLUM2314 11078 RIO MADEIRA #SGL422796 OS712/07 OS863/08 #02053562552 MS1534/11 MS521/12 #07796391105 MSC AURORA #MSCUXD685 405 MSC MELISSA #MSCURK771 120 RIO MADEIRA #SGL420737 BBC MANITOBA #

2016-12-25

2016-12-26

2017-02-03

2017-02-03

2017-02-13

2017-02-14 00

2016-12-25

2016-12-26

2017-02-06

2017-02-06

2017-02-16

2017-02-14 00

2017-01-18

2017-01-18

2017-02-05

2017-02-05

2017-02-15

2017-02-14 11MB ; 12MB

2017-01-22

2017-01-22

2017-02-03

2017-02-04

2017-02-13

2017-02-14 31UHA

2017-01-30

2017-01-30

2017-02-02

2017-02-02

2017-02-07

2017-02-14 00C ; 30MKA; 32MB ; 42MB ; 42MBR; 42MKA

2016-12-28

2017-01-04

2017-02-06

2017-02-06

2017-02-16

2017-02-14 12UHA

2017-01-18

2017-01-18

2017-02-04

2017-02-05

2017-02-14

2017-02-14 10MA ; 10PGB; 11MB ; 12MB ; 20C ; 20MA ; 21; 21MB ; 22; 22MB ; 31; 32; 3x; 4x

2017-01-22

2017-01-22

2017-02-03

2017-02-04

2017-02-13

2017-02-14 31UHA

2017-01-22

2017-01-22

2017-02-03

2017-02-04

2017-02-13

2017-02-14 32UHA

2017-02-09

2017-02-09

2017-02-10

2017-02-10

2017-02-15

2017-02-14 00EKH

2016-12-16

2016-12-20

2017-01-12

2017-01-14

2017-01-22

2017-02-15 30MA

2016-12-31

2017-01-03

2017-02-06

2017-02-06

2017-02-16

2017-02-15 00

2017-01-04

2017-01-04

2017-02-06

2017-02-06

2017-02-16

2017-02-15 32UHA

2016-12-25

2016-12-25

2017-02-06

2017-02-06

2017-02-16

2017-02-16 21UHA

2017-01-25

2017-01-25

2017-02-04

2017-02-04

2017-02-14

2017-02-16 22UHA

2017-02-07

2017-02-07

2017-02-09

2017-02-09

2017-02-14

2017-02-16 31MB ; 41MB

2017-02-11

2017-02-11

2017-02-12

2017-02-13

2017-02-17

2017-02-16 11UHA

2016-12-29

2016-12-31

2017-02-06

2017-02-06

2017-02-16

2017-02-17 00

2017-01-20

2017-01-25

2017-02-05

2017-02-05

2017-02-15

2017-02-17 11UHA

2017-01-25

2017-01-25

2017-02-04

2017-02-04

2017-02-14

2017-02-17 10BAA

2017-01-22

2017-01-21

2017-02-09

2017-02-09

2017-02-19

2017-02-18 40MA


4840 Sea

92

22713,00

251 Hamburg

4929 Air

9

1276,90

5 Frankfurt

4759 Sea

4

57830,18

210 Nhava Sheva

ALEXANDRIA

4796 Sea

2

33729,42

65 Nhava Sheva

ALEXANDRIA

4849 Sea

10

27880,00

71 Gemlik

ALEXANDRIA

4916 Air

11

595,42

3 Frankfurt

4762 Sea

15

11933,00

124 Hamburg

4937 Air

2

485,00

4698 Sea

6

26480,00

4950 Air

2

16,00

4938 Air

1

0,30

4852 Sea

1

8130,00

33 Hamburg

ALEXANDRIA

4861 Sea

3

6150,00

27 Hamburg

ALEXANDRIA

4797 Sea

5

7702,50

31 Hamburg

ALEXANDRIA

4831 Sea

12

219550,00

824 Banten

ALEXANDRIA

4817 Sea

59

85350,00

294 Hamburg

ALEXANDRIA

4833 Sea

13

21500,00

105 Mumbai

ALEXANDRIA

4997 Air

1

100,00

4769 Sea

3

7292,00

4 Malmö

29 Ulsan

ALEXANDRIA

CAIRO

CAIRO

ALEXANDRIA

CAIRO

ALEXANDRIA

0 Düsseldorf

CAIRO

0 Prag

CAIRO

1 Köln 56 Nhava Sheva

CAIRO ALEXANDRIA

MSC BRUNELLA #MSCURK803 436 AF341M/10 AF570/12 #05752956330 MSC MAEVA #MSCUKD851 271 MSC MAEVA #MSCUKD850 869 MSC MIRELLA #MSCURK807 338 MS1520/07 MS541/08 #07796229475 MSC BRUNELLA #MSCURK754 803 KL9316/08 KL4834/09 MP8 #07450139913 HUANGHAI ADVANCE #ULS-ALX4698 MS1520/10 MS541/11 #07796229486 LH7435E/10 LH586/11 #02053562585 MSC BRUNELLA #MSCURK808 922 MSC BRUNELLA #MSCURK824 259 MSC ALGECIRAS #MSCURK840 909 BBC MANITOBA # MSC BRUNELLA #MSCURK816 081 MAERSK INDUS #959297220 MS541/22 #07796229523 MAERSK INDUS #NSAALY4274 263336

2017-01-25

2017-01-26

2017-02-12

2017-02-12

2017-02-22

2017-02-18 00

2017-02-10

2017-02-10

2017-02-12

2017-02-12

2017-02-17

2017-02-18 00EKH; 11CYE; 12CYE; 1X; 20MA ; 2X; 30MKA; 42MBR

2017-01-19

2017-01-18

2017-02-03

2017-02-03

2017-02-13

2017-02-19 00

2017-01-19

2017-01-18

2017-02-03

2017-02-03

2017-02-13

2017-02-19 00

2017-01-29

2017-01-28

2017-02-08

2017-02-08

2017-02-18

2017-02-19 3x

2017-02-07

2017-02-07

2017-02-08

2017-02-08

2017-02-13

2017-02-20 00; 10MA ; 11C ; 30MKA; 31MKA; 41MB ; 41MK ; 42MB

2017-01-25

2017-01-26

2017-02-12

2017-02-12

2017-02-22

2017-02-20 10BAA

2017-02-08

2017-02-08

2017-02-13

2017-02-13

2017-02-18

2017-02-20 30PUR

2016-12-26

2017-01-04

2017-02-13

2017-02-19

2017-02-23

2017-02-21 31UHA

2017-02-10

2017-02-10

2017-02-11

2017-02-11

2017-02-16

2017-02-21 00EKH; 10PAB

2017-02-10

2017-02-10

2017-02-11

2017-02-11

2017-02-16

2017-02-21 42BAA

2017-01-25

2017-01-25

2017-02-12

2017-02-12

2017-02-22

2017-02-22 12BAA

2017-01-25

2017-01-26

2017-02-12

2017-02-12

2017-02-22

2017-02-22 10LAC

2017-02-01

2017-02-01

2017-02-18

2017-02-19

2017-02-28

2017-02-23 11MBR

2017-01-22

2017-01-21

2017-02-09

2017-02-09

2017-02-19

2017-02-24 40MA

2017-01-25

2017-01-25

2017-02-12

2017-02-12

2017-02-22

2017-02-24 1X; 20; 20MA ; 21; 22; 2X; 30LBG; 31; 3X; 3x

2017-01-26

2017-01-25

2017-02-17

2017-02-17

2017-02-27

2017-02-24 10LCB

2017-02-22

2017-03-22

2017-02-22

2017-02-23

2017-02-27

2017-02-24 42MKA

2017-01-26

2017-01-26

2017-02-16

2017-02-17

2017-02-26

2017-02-24 00


4940 Air

12

7892,17

31 Frankfurt

CAIRO

2941 Air

2

3322,00

21 Düsseldorf

CAIRO

4956 Air

2

8746,00

6 Amsterdam

CAIRO

4955 Air

1

35,00

0 Amsterdam

CAIRO

2942 Air

1

28,00

0 Düsseldorf

CAIRO

4804 Sea

13

137257,16

4878 Sea

2

17417,00

134 Rotterdam

ALEXANDRIA

4658 Sea

4

61190,00

210 Nhava Sheva

ALEXANDRIA

4694 Sea

2

32572,66

105 Nhava Sheva

ALEXANDRIA

974 Laem Chabang ALEXANDRIA

4815 Sea

6

26480,00

4841 Sea

678

235157,20

29 Ulsan

4867 Sea

5

24645,00

148 Antwerpen

ALEXANDRIA

4920 Sea

1

19532,00

67 Rotterdam

ALEXANDRIA

4802 Sea

6

144985,00

3567 Sea

43

363,53

4834 Sea

1

25560,00

4700 Sea

6

19000,00

153 Hamburg

ALEXANDRIA

4811 Sea

8

46200,00

358 Antwerpen

ALEXANDRIA

4868 Sea

2

11112,00

79 Antwerpen

ALEXANDRIA

4975 Air

2

21,45

4967 Air

1

1342,00

2207 Hamburg

656 Banten 2 Hamburg 61 Ulsan

ALEXANDRIA ALEXANDRIA

ALEXANDRIA ALEXANDRIA ALEXANDRIA

0 Prag

CAIRO

4 Chennai

CAIRO

LH7119/18 LH8292/19 #02099051315 KL8440/14 MP8140/16 #07453010532 MP8140/16 #07454086793 MS758/16 #07796392085 MS1520/15 MS541/17 #07796229490 BBC MANITOBA #LAEALE001 MSC LORETTA #MSCURK859 639 APL HOLLAND #YMLUM5020 00521 MALLECO #YMLUM5020 00524 DA JI #ULSALX-4815 MSC BRUNELLA #MSCURK813 500 HS ROME #MSCURK828 672 HS ROME #MSCURK974 773 BBC MANITOBA # HS ROME #MSCURK754 977 DA JI #ULSALX-4834 MSC BRUNELLA #MSCURK543 412 MSC ALGECIRAS #MSCURK783 612 HS ROME #MSCURK828 805 LH4731S/20 LH8290/21 #02074986096 SV779/23 SV307/24 #06527593834

2017-02-17

2017-02-17

2017-02-19

2017-02-19

2017-02-24

2017-02-24 1X; 2X; 31C ; 31MB ; 41MB ; 99UBA

2017-02-14

2017-02-14

2017-02-16

2017-02-16

2017-02-21

2017-02-24 10MA

2017-02-16

2017-02-16

2017-02-16

2017-02-16

2017-02-21

2017-02-24 31UHA

2017-02-16

2017-02-16

2017-02-16

2017-02-16

2017-02-21

2017-02-24 00UEN

2017-02-15

2017-02-15

2017-02-17

2017-02-17

2017-02-22

2017-02-24 10MA

2017-01-15

2017-01-16

2017-02-09

2017-02-09

2017-02-19

2017-02-25 32UHA

2017-01-30

2017-01-30

2017-02-12

2017-02-12

2017-02-22

2017-02-25 11UHA

2016-12-16

2016-12-16

2017-02-16

2017-02-15

2017-02-26

2017-02-26 00

2016-12-23

2016-12-23

2017-02-16

2017-02-15

2017-02-26

2017-02-26 00

2017-01-18

2017-01-23

2017-02-21

2017-02-16

2017-03-03

2017-02-26 32UHA

2017-01-25

2017-01-26

2017-02-12

2017-02-12

2017-02-22

2017-02-26 00

2017-02-04

2017-02-05

2017-02-18

2017-02-19

2017-02-28

2017-02-26 10PAC

2017-02-06

2017-02-06

2017-02-18

2017-02-19

2017-02-28

2017-02-26 12UHA

2017-01-22

2017-01-21

2017-02-09

2017-02-09

2017-02-19

2017-02-26 30MA

2017-02-01

2017-02-05

2017-02-19

2017-02-19

2017-03-01

2017-02-26 00ABK; 10MA ; 11MK ; 12MKA; 30MKA

2017-01-15

2017-01-23

2017-02-21

2017-02-16

2017-03-03

2017-02-27 10PAC

2017-01-25

2017-01-26

2017-02-12

2017-02-12

2017-02-22

2017-02-27 22UHA

2017-02-01

2017-02-01

2017-02-18

2017-02-19

2017-02-28

2017-02-27 11MB ; 12MB

2017-02-04

2017-02-05

2017-02-18

2017-02-19

2017-02-28

2017-02-27 10PAC

2017-02-20

2017-02-20

2017-02-22

2017-02-22

2017-02-27

2017-02-27 32MB

2017-02-23

2017-02-26

2017-02-24

2017-02-26

2017-03-01

2017-02-27 11UHA


4970 Air

5

1494,90

4 Frankfurt

CAIRO

5017 Air

2

680,00

3 Frankfurt

CAIRO

4784 Sea

5

41606,40

335 Shanghai

4941 Air

1

286,00

4945 Air

1

1,00

3584 Air

14

119,90

3583 Air

8

5,80

4978 Air

1

249,00

4887 Air

3

4835,00

4985 Air

1

4708,00

4957 Air

19

12333,69

4799 Sea

5

41246,40

4806 Sea

81

966069,63

4863 Sea

5

123881,00

4876 Sea

10

50851,06

5007 Air

1

3,30

4981 Air

1

10,50

4823 Sea

2

12430,00

92 Ho Chi Minh

ALEXANDRIA

4866 Sea

2

12480,00

92 Ho Chi Minh Port

ALEXANDRIA

4901 Sea

1

6000,00

70 Hamburg

ALEXANDRIA

4908 Sea

1

8295,00

77 Hamburg

ALEXANDRIA

ALEXANDRIA

1 Incheon

CAIRO

0 Wien

CAIRO

1 Düsseldorf

CAIRO

0 Budapest

CAIRO

2 Leipzig

CAIRO

16 Busan 2 Amsterdam 21 Düsseldorf

335 Shanghai

CAIRO CAIRO CAIRO

ALEXANDRIA

5015 Laem Chabang ALEXANDRIA 188 Tianjin

86 Antwerpen

ALEXANDRIA

ALEXANDRIA

0 Leipzig

CAIRO

0 Wien

CAIRO

MS1520/23 MS541/24 #07796229512 MS1520/24 MS541/25 #07796229560 EVER LYRIC #YMLUM2314 21672 OZ747/15 EY431/16 EY653 #60773529326 MS798/16 #07792597540 AF341/23 AF6752/25 #05752956352 TK1036 TK0690 #23562681146 MS1597/17 MS541/19 # CV6919/18 #17219362265 MP8910/23 #07454863071 LH7105/20 LH8290/21 #02099051326 EVER LYRIC #YMLUM2314 21697 BBC MANITOBA #LAEALE002 COSCO NETHERLANDS #COSU612836 9540 HS ROME #MSCURK865 187 MS1597/24 MS541/26 #07796229556 MS798/24 #07792597691 YM HORIZON #YMLUM4903 02723 YM HORIZON #YMLUM4903 02720 MSC BILBAO #MSCURK926 989 MSC BILBAO #MSCURK952 944

2017-02-23

2017-03-23

2017-02-24

2017-02-25

2017-03-01

2017-02-27 00; 00C ; 22MK ; 32MKA; 41MK

2017-02-25

2017-02-25

2017-02-25

2017-02-26

2017-03-02

2017-02-27 42MB

2017-01-22

2017-01-25

2017-02-23

2017-02-25

2017-03-05

2017-02-27 11UHA

2017-02-15

2017-02-15

2017-02-17

2017-02-17

2017-02-22

2017-02-27 00

2017-02-16

2017-02-16

2017-02-16

2017-02-18

2017-02-21

2017-02-27 99UBA

2017-02-23

2017-02-23

2017-02-25

2017-02-26

2017-03-02

2017-02-27 00ABK; 11MBR; 12MBR; 20MA ; 40MKA

2017-02-24

2017-02-24

2017-02-25

2017-02-26

2017-03-02

2017-02-27 30MA ; 40MA

2017-02-18

2017-02-18

2017-02-19

2017-02-18

2017-02-24

2017-02-28 00EKH

2017-02-18

2017-02-18

2017-02-21

2017-02-21

2017-02-26

2017-02-28 00

2017-02-23

2017-02-23

2017-02-23

2017-02-23

2017-02-28

2017-02-28 31UHA

2017-02-20

2017-02-18

2017-02-22

2017-02-22

2017-02-27

2017-02-28 00BZK; 00MK ; 11C ; 12MB ; 1X; 22MB ; 31MB ; 41MB

2017-01-22

2017-01-25

2017-02-23

2017-02-25

2017-03-05

2017-02-28 12UHA

2017-01-15

2017-01-16

2017-02-09

2017-02-09

2017-02-19

2017-03-01 41UHA

2017-01-23

2017-01-23

2017-02-24

2017-02-24

2017-03-06

2017-03-01 00

2017-02-04

2017-02-05

2017-02-18

2017-02-19

2017-02-28

2017-03-01 12MB

2017-02-24

2017-02-27

2017-02-27

2017-02-27

2017-03-04

2017-03-01 00EKH

2017-02-24

2017-02-24

2017-02-24

2017-02-24

2017-03-01

2017-03-01 00UEN

2017-01-31

2017-01-31

2017-02-24

2017-02-24

2017-03-06

2017-03-02 31UHA

2017-01-31

2017-01-31

2017-02-24

2017-02-24

2017-03-06

2017-03-02 32UHA

2017-02-08

2017-02-11

2017-02-25

2017-02-25

2017-03-07

2017-03-02 00ABK

2017-02-08

2017-02-11

2017-02-25

2017-02-25

2017-03-07

2017-03-02 10UBA


4989 Air

10

8734,50

15 Frankfurt

CAIRO

4853 Sea

1

11640,00

96 Hamburg

ALEXANDRIA

4854 Sea

5

67660,00

482 Hamburg

ALEXANDRIA

4858 Sea

3

42680,00

289 Hamburg

ALEXANDRIA

3580 Sea

9

6309,00

12 Hamburg

ALEXANDRIA

4931 Air

2

3284,00

26 Incheon

CAIRO

4729 Sea

4

367000,00

4742 Sea

8

5273,20

4885 Sea

3

53881,00

4699 Sea

24

3086000,00

4902 Sea

3

7292,00

4987 Air

2

1780,00

5023 Air

2

3572 Sea

630 Rotterdam

BURULLUS

8 Laem Chabang ALEXANDRIA 90 Rotterdam 6570 Ulsan

56 Nhava Sheva

BURULLUS ALEXANDRIA

ALEXANDRIA

4 Prag

CAIRO

680,00

3 Frankfurt

CAIRO

16

687,83

4 Hamburg

ALEXANDRIA

4857 Sea

9

158473,00

4827 Sea

1

14776,00

67 Busan

ALEXANDRIA

4881 Sea

2

12600,00

86 Hamburg

ALEXANDRIA

4998 Air

1

125,00

0 Frankfurt

CAIRO

2945 Air

1

25,00

0 Frankfurt

CAIRO

4828 Sea

5

40886,00

335 Busan

ALEXANDRIA

4775 Sea

11

146933,00

736 Busan

ALEXANDRIA

472 Nhava Sheva

DAMIETTA

LH7105S/27 LH8290/28 #02099051363 MSC BILBAO #MSCURK933 423 MSC BILBAO #MSCURK931 575 MSC BILBAO #MSCURK900 372 MSC BILBAO #MSCURK859 529 CV6916/25 #17219362361 SCHILLIG #SCHI-ROTBUR-1 MSC REUNION #MSCUW7203 778 SCHILLIG #SCHIL-ROTBUR-2 HUANGHAI ADVANCE #ULS-ALX4699 CHARLOTTE SCHULTE #SAFM769481 302 RFS MS0541 #07796429804 LH8290/02 #02099051411 MSC BILBAO #MSCURK894 898 CMA CGM MOZART #CAD0285529 MSC ROSA M #MSCKU6409 06 MSC BILBAO #MSCURK872 480 LH8290/02 #02099051396 MS1520/02 MS541/03 #07796229545 MSC ROSA M #MSCUKU640 971 MSC ROSA M #MSCUKU641 078

2017-02-27

2017-02-27

2017-02-28

2017-02-28

2017-03-05

2017-03-02 00BZK; 2X; 30MKA; 31; 31MKA; 32; 32MKA; 42MKA

2017-02-08

2017-02-11

2017-02-25

2017-02-25

2017-03-07

2017-03-02 10UBA

2017-02-08

2017-02-11

2017-02-25

2017-02-25

2017-03-07

2017-03-02 10UBA

2017-02-08

2017-02-11

2017-02-25

2017-02-25

2017-03-07

2017-03-02 10UBA; 11UBA; 12UBA

2017-02-08

2017-02-11

2017-02-25

2017-02-25

2017-03-07

2017-03-02 40URA

2017-02-25

2017-02-25

2017-02-28

2017-02-28

2017-03-05

2017-03-02 00

2017-02-16

2017-02-13

2017-03-04

2017-03-04

2017-03-13

2017-03-03 20MA

2017-01-27

2017-01-28

2017-02-25

2017-02-24

2017-03-07

2017-03-03 42MBR

2017-02-16

2017-02-13

2017-03-03

2017-03-04

2017-03-13

2017-03-04 20MA

2016-12-26

2017-01-04

2017-02-13

2017-02-19

2017-02-23

2017-03-05 31UHA

2017-02-08

2017-02-09

2017-02-23

2017-02-23

2017-03-05

2017-03-05 00

2017-02-22

2017-02-26

2017-02-24

2017-02-27

2017-03-01

2017-03-05 11MB ; 12MB

2017-03-02

2017-03-02

2017-03-02

2017-03-03

2017-03-07

2017-03-05 42MB

2017-02-08

2017-02-11

2017-02-25

2017-02-25

2017-03-07

2017-03-05 00BTA; 10BTA; 10UBA; 12MKA; 30MKA

2017-02-05

2017-02-08

2017-02-15

2017-02-15

2017-02-25

2017-03-05 00

2017-01-22

2017-01-22

2017-02-25

2017-02-27

2017-03-07

2017-03-06 11UHA

2017-02-11

2017-02-11

2017-02-28

2017-02-25

2017-03-10

2017-03-06 11BAC; 12BAC

2017-03-02

2017-03-02

2017-03-03

2017-03-03

2017-03-08

2017-03-06 20EKH

2017-03-02

2017-03-02

2017-03-03

2017-03-03

2017-03-08

2017-03-06 00MB

2017-01-22

2017-01-22

2017-02-25

2017-02-27

2017-03-07

2017-03-07 11UHA

2017-01-22

2017-01-22

2017-02-25

2017-02-27

2017-03-07

2017-03-07 22UHA


4877 Sea

69

104418,00

367 Hamburg

ALEXANDRIA

MSC BILBAO #MSCURK894 039

2017-02-08

2017-02-11

2017-02-25

2017-02-25

2017-03-07

0 Charlotte

CAIRO

2017-03-01

2017-03-01

2017-03-03

2017-03-03

2017-03-08

62 Düsseldorf

CAIRO

QR0714/01 QR1303/03 #15704926585 MS1520/02 MS541/03 #07796229582 MS798/03 #07792597993 TK0690/03 #23561170476 MSC BILBAO #MSCURK894 229 MSC ROSA M #MSCUKU641 193 CMA CGM NERVAL #CAD0287204 CMA CGM NERVAL #CAD0287201 RIO DE LA PLATA #SGL429329 LH8290/07 #02099051444 MSC CHLOE #MSCURK975 432 MSC CHLOE #MSCURK935 063 MSC CHLOE #MSCURK976 687

2017-03-07 00; 10BAB; 10LBF; 10MA ; 11BAB; 11BFT; 12BAB; 12BFT; 12BJT; 1X; 20; 20BAB; 20BFT; 20MA ; 21; 22; 2X; 30; 30BFT; 31; 32; 3X; 40; 40BFT; 41; 42; 4x; 99BZK 2017-03-08 31MKA

4996 Air

1

10,00

5008 Air

9

8750,50

2017-03-02

2017-03-02

2017-03-03

2017-03-03

2017-03-08

2017-03-08 41MB

5027 Air

1

0,80

0 Wien

CAIRO

2017-03-03

2017-03-03

2017-03-03

2017-03-03

2017-03-08

2017-03-08 99UBA

5003 Air

1

678,00

0 Izmir

CAIRO

2017-03-03

2017-03-03

2017-03-03

2017-03-03

2017-03-08

2017-03-08 00URA

4856 Sea

57

84612,70

2017-02-08

2017-02-11

2017-02-25

2017-02-25

2017-03-07

2017-01-22

2017-01-22

2017-02-25

2017-02-27

2017-03-07

2017-03-08 10LAC; 11C ; 12MB ; 1X; 20LBF; 20MA ; 30; 31; 32; 3X; 40; 40MA ; 41; 42 2017-03-09 00

4825 Sea

35

343027,25

4900 Sea

3

48815,00

157 Nhava Sheva

DAMIETTA

2017-02-20

2017-02-20

2017-03-01

2017-03-02

2017-03-11

2017-03-09 00

4906 Sea

1

9815,00

52 Nhava Sheva

DAMIETTA

2017-02-20

2017-02-20

2017-03-01

2017-03-02

2017-03-11

2017-03-09 00

4880 Sea

6

127982,04

230 Hamburg

2017-02-22

2017-02-21

2017-03-04

2017-03-04

2017-03-14

2017-03-09 11BAT; 12BAT

5053 Air

1

125,00

1 Frankfurt

CAIRO

2017-03-07

2017-03-07

2017-03-07

2017-03-08

2017-03-12

2017-03-09 42MKA

4925 Sea

1

964,00

3 Hamburg

ALEXANDRIA

2017-02-15

2017-02-16

2017-03-04

2017-03-05

2017-03-14

2017-03-09 42CYE

4912 Sea

12

60749,00

102 Budapest

ALEXANDRIA

2017-02-15

2017-02-16

2017-03-04

2017-03-05

2017-03-14

2017-03-12 30MA

4898 Sea

69

79708,47

355 Hamburg

ALEXANDRIA

2017-02-15

2017-02-16

2017-03-04

2017-03-05

2017-03-14

CAIRO

MS1520/02 MS541/04 #07796229593

2017-03-03

2017-03-03

2017-03-05

2017-03-05

2017-03-10

6314 Shanghai

ALEXANDRIA

2017-01-15

2017-01-19

2017-02-18

2017-02-23

2017-02-28

153 Hamburg

ALEXANDRIA

2017-02-15

2017-02-16

2017-03-04

2017-03-05

2017-03-14

2017-03-12 31UHA

7092,60

20 Hamburg

ALEXANDRIA

2017-02-15

2017-02-16

2017-03-04

2017-03-05

2017-03-14

2017-03-13 10PGB

28

15487,00

25 Hamburg

ALEXANDRIA

2017-02-15

2017-02-16

2017-03-04

2017-03-05

2017-03-14

2017-03-13 10BTA; 12BTA

4873 Sea

15

11933,00

124 Hamburg

ALEXANDRIA

2017-02-15

2017-02-16

2017-03-04

2017-03-05

2017-03-14

2017-03-14 20BAA

4722 Sea

2

370000,00

312 Rotterdam

BURULLUS

VENTURE DYLAN # MSC CHLOE #MSCURK871 110 MSC CHLOE #MSCURU014 271 MSC CHLOE #MSCURK985 597 MSC CHLOE #MSCURK900 869 MILADY #MILA-ROTBUR-1

2017-03-12 10C ; 11MB ; 12MB ; 12MKA; 1X; 20LCL; 20MA ; 22; 2X; 30; 30MA ; 30MKA; 31; 32; 3X; 40; 40MKA; 41; 42 2017-03-12 00; 00BZK; 00EKH; 00MK ; 10; 10MA ; 12MB ; 1X; 20; 22MB ; 2X; 30; 31MB ; 31MKA; 32MB ; 32MKA; 40; 41MK ; 42MB ; 42MKA; 42UBA 2017-03-12 11MBL; 12MBL

5001 Air

31

4956,42

4790 Sea

60

466362,28

4846 Sea

6

19000,00

4922 Sea

3

3585 Sea

2017-02-15

2017-02-24

2017-03-14

2017-03-15

2017-03-24

2017-03-14 11BAT; 12BAT

384 Hamburg 1142 Busan

16 Düsseldorf

ALEXANDRIA ALEXANDRIA

ALEXANDRIA


4891 Sea

24

188522,00

2031 Hamburg

ALEXANDRIA

3579 Sea

2

134,60

1 Hamburg

ALEXANDRIA

4958 Sea

2

38356,00

134 Rotterdam

ALEXANDRIA

4907 Sea

204

198524,00

418 Hamburg

ALEXANDRIA

4904 Sea

3

4600,00

16 Hamburg

ALEXANDRIA

5018 Air

10

7895,70

20 Düsseldorf

CAIRO

5044 Air

1

340,00

1 Frankfurt

CAIRO

4892 Sea

1

7575,00

58 Antwerpen

ALEXANDRIA

4708 Sea

4

34530,00

181 Antwerpen

ALEXANDRIA

5029 Air

2

485,00

5038 Air

1

5062 Air

4 Malmö

CAIRO

10,00

0 Charlotte

CAIRO

1

11,60

0 Frankfurt

CAIRO

5055 Air

1

170,00

1 Frankfurt

CAIRO

5040 Air

1

50,00

1 Amsterdam

CAIRO

5057 Air 2948 Air

1 2

1165,00 3232,90

2 Amsterdam 20 Frankfurt

CAIRO CAIRO

2947 Air

2

1404,00

7 Frankfurt

CAIRO

4973 Sea

3

35903,00

4939 Sea

1

4683,31

4936 Sea

3

227000,00

4814 Sea

24

3086000,00

4988 Sea

4

65363,00

268 Rotterdam

ALEXANDRIA

4994 Sea

2

33505,00

134 Rotterdam

ALEXANDRIA

201 Rotterdam

ALEXANDRIA

38 Hamburg

ALEXANDRIA

298 Rijeka 6480 Ulsan

BURULLUS ALEXANDRIA

MSC CHLOE #MSCURK953 132 MSC CHLOE #MSCURK903 095 KATHERINE #MSCURU054 020 MSC CHLOE #MSCURK936 509 MSC CHLOE #MSCURK969 971 MS1520/06 MS541/08 #07796229604 MS1584/10 MS541/10 #07796229626 BBC BANGKOK #019 BBC BANGKOK #020 AF123/07 AF6752/11 #05757497624 QR0714/09 QR1301/11 # MS1520/10 MS541/12 #07796229674 MS1584/10 MS541/10 #07796229652 MS1584/10 MS541/10 # MP8910/13 # KL8440/10 MP8910/13 #07453010576 MS1584/10 MS541/10 #07796229615 MSC MELISSA #MSCURU093 911 MSC PARIS #MSCURU025 525 SCHILLPLATE #SCHIL-RIJBUR-1 DA JI #ULSALX-4814 MSC MELISSA #MSCURU109 477 MSC MELISSA #MSCURU125 242

2017-02-15

2017-02-16

2017-03-04

2017-03-05

2017-03-14

2017-03-14 11MBL; 12MBL

2017-02-15

2017-02-16

2017-03-04

2017-03-05

2017-03-14

2017-03-14 20BAA

2017-02-20

2017-02-20

2017-03-04

2017-03-05

2017-03-14

2017-03-14 11UHA

2017-02-15

2017-02-16

2017-03-04

2017-03-05

2017-03-14

2017-03-15 00

2017-02-15

2017-02-16

2017-03-04

2017-03-05

2017-03-14

2017-03-15 10PAA

2017-03-06

2017-03-06

2017-03-08

2017-03-08

2017-03-13

2017-03-15 00C ; 00MA ; 11C ; 1X; 2X

2017-03-07

2017-03-07

2017-03-08

2017-03-08

2017-03-13

2017-03-15 42MB

2017-02-10

2017-02-14

2017-02-28

2017-03-06

2017-03-10

2017-03-16 11MBL

2017-02-10

2017-02-14

2017-02-28

2017-03-06

2017-03-10

2017-03-16 10MA ; 20MA ; 30MA

2017-03-08

2017-03-08

2017-03-12

2017-03-12

2017-03-17

2017-03-17 30PUR

2017-03-09

2017-03-09

2017-03-11

2017-03-11

2017-03-16

2017-03-17 32MKA

2017-03-10

2017-03-10

2017-03-12

2017-03-12

2017-03-17

2017-03-17 10PAB

2017-03-10

2017-03-10

2017-03-10

2017-03-12

2017-03-15

2017-03-17 21MB

2017-03-10

2017-03-10

2017-03-10

2017-03-10

2017-03-15

2017-03-17 00UEN

2017-03-13 2017-03-10

2017-03-13 2017-03-10

2017-03-14 2017-03-14

2017-03-14 2017-03-14

2017-03-19 2017-03-19

2017-03-17 42UHA 2017-03-17 20MA

2017-03-10

2017-03-10

2017-03-10

2017-03-11

2017-03-15

2017-03-17 00MK

2017-02-27

2017-02-26

2017-03-13

2017-03-13

2017-03-23

2017-03-18 11UHA

2017-02-22

2017-02-22

2017-03-13

2017-03-13

2017-03-23

2017-03-18 10UBA

2017-03-15

2017-03-11

2017-03-17

2017-03-19

2017-03-27

2017-03-18 20BAT

2017-01-18

2017-01-23

2017-02-21

2017-02-21

2017-03-03

2017-03-19 32UHA

2017-02-27

2017-02-26

2017-03-13

2017-03-13

2017-03-23

2017-03-19 11UHA

2017-02-27

2017-02-26

2017-03-13

2017-03-13

2017-03-23

2017-03-19 11UHA


5024 Air

2

506,00

2 Prag

CAIRO

5026 Air

1

1,00

0 Prag

CAIRO

5039 Air

8

3133,45

8 Düsseldorf

CAIRO

5059 Air

1

350,00

1 Istanbul

CAIRO

4848 Sea

17

24450,00

4932 Sea

37

42148,00

4935 Sea

1

2943 Sea

67 Busan

ALEXANDRIA

168 Hamburg

ALEXANDRIA

451255,00

452 Blexen

ALEXANDRIA

6

7,39

0 Blexen

ALEXANDRIA

3592 Air

1

22,70

5069 Air

1

2,00

0 Düsseldorf

4965 Sea

31

8368,00

19 Antwerpen

4974 Sea

6

70500,00

301 Blexen

ALEXANDRIA

4921 Sea

2

69000,00

356 Antwerpen

ALEXANDRIA

4874 Sea

ALEXANDRIA

0 Port of Export CAIRO

CAIRO

ALEXANDRIA

39

22669,00

309 Hamburg

5061 Air

3

1020,00

4 Frankfurt

4752 Sea

5

85493,10

339 Shanghai

ALEXANDRIA

4951 Sea

12

89355,00

803 Hamburg

ALEXANDRIA

4928 Sea

2

10600,00

88 Hamburg

ALEXANDRIA

2944 Sea

9

30027,61

44 Blexen

ALEXANDRIA

4810 Sea

2

27517,42

4897 Sea

1

8636,00

4919 Sea

59

94227,32

CAIRO

138 Shanghai

ALEXANDRIA

67 Houston

ALEXANDRIA

336 Hamburg

ALEXANDRIA

LH7431S/06 LH8290/07 #02074986284 LH7431S/06 LH8290/07 #02074986310 MS1520/09 MS541/10 # MB200/12 #71699893013 MSC LA SPEZIA #MSCUKU652 398 MSC PARIS #MSCURU068 731 NORDERSAND #NORD-BLEBUR-1A NORDERSAND #NORD-BLEBUR-1B LH7431S/08 LH8290/09 #02074986321 LH7105/13 LH8290/14 #02099051470 MSC MELISSA #MSCURU085 644 NORDERSAND #NORD-BLEBUR-5 NORDERSAND #NORD-BLEBUR-3 RIO MADEIRA #SGL430140 LH8290/16 #02099051481 VENTURE DYLAN # MSC PARIS #MSCURU051 307 NORDERSAND #NORD-BLEBUR-4 NORDERSAND #NORD-BLEBUR-1C MSC ROSA M #MSCUU9265 432 DUBAI EXPRESS #HLCUHOU17 0209775 MSC PARIS #MSCURU020 724

2017-03-06

2017-03-07

2017-03-08

2017-03-13

2017-03-13

2017-03-19 41BAA

2017-03-06

2017-03-06

2017-03-08

2017-03-15

2017-03-13

2017-03-19 41BAA

2017-03-08

2017-03-09

2017-03-10

2017-03-11

2017-03-15

2017-03-19 10MA ; 12UBA; 1X; 2X; 31MB

2017-03-12

2017-03-12

2017-03-12

2017-03-12

2017-03-17

2017-03-19 10SGC

2017-01-29

2017-01-31

2017-03-14

2017-03-15

2017-03-24

2017-03-19 30; 31; 32

2017-02-22

2017-02-22

2017-03-13

2017-03-13

2017-03-23

2017-03-01

2017-03-02

2017-03-18

2017-03-20

2017-03-28

2017-03-19 10C ; 10PDB; 11C ; 12C ; 12UBA; 1X; 2X; 30MA ; 30MKA; 31; 32; 3X; 40MKA 2017-03-19 11MB

2017-03-01

2017-03-02

2017-03-20

2017-03-20

2017-03-30

2017-03-19 11MB

2017-03-08

2017-03-08

2017-03-10

2017-03-13

2017-03-15

2017-03-19 41BAA

2017-03-13

2017-03-13

2017-03-14

2017-03-15

2017-03-19

2017-03-19 00EKH

2017-02-25

2017-02-28

2017-03-13

2017-03-13

2017-03-23

2017-03-20 00; 11; 12; 20; 21; 22; 30; 31; 32

2017-03-01

2017-03-02

2017-03-18

2017-03-20

2017-03-28

2017-03-20 21MB ; 22MB

2017-03-01

2017-03-02

2017-03-20

2017-03-20

2017-03-30

2017-03-20 11MB ; 12MB

2017-03-01

2017-03-01

2017-03-13

2017-03-13

2017-03-23

2017-03-20 20BAA

2017-03-16

2017-03-16

2017-03-16

2017-03-17

2017-03-21

2017-03-20 11MB ; 12MB ; 21MB

2017-01-15

2017-01-19

2017-02-23

2017-02-23

2017-03-05

2017-03-20 32UHA

2017-02-22

2017-02-22

2017-03-13

2017-03-13

2017-03-23

2017-03-20 31UHA

2017-03-01

2017-03-02

2017-03-18

2017-03-20

2017-03-28

2017-03-20 21MB ; 22MB

2017-03-01

2017-03-02

2017-03-20

2017-03-20

2017-03-30

2017-03-20 11MB

2017-01-26

2017-01-30

2017-03-14

2017-03-14

2017-03-24

2017-03-21 31UHA

2017-02-05

2017-02-11

2017-03-15

2017-03-15

2017-03-25

2017-03-21 22UHA

2017-02-22

2017-02-22

2017-03-13

2017-03-13

2017-03-23

2017-03-21 00URA; 10C ; 10LDK; 11MB ; 11UBA; 12MB ; 12UBA; 20LDK; 20MA ; 30MA ; 30MKA; 31; 32; 3X; 40LCA; 41; 42; 4x


5047 Air

1

9,00

0 Charlotte

CAIRO

5054 Air

1

134,80

0 Dubai

CAIRO

5050 Air

13

1776,71

6 Düsseldorf

CAIRO

4948 Sea

4

59620,00

3593 Air

1

127,00

5068 Air

1

1,86

5070 Air

5

156,95

4836 Sea

4

55789,62

4966 Sea

8

47700,59

79 Antwerpen

ALEXANDRIA

4984 Sea

1

7575,00

58 Antwerpen

ALEXANDRIA

4787 Sea

4

1586,00

20 Shanghai

ALEXANDRIA

4816 Sea

14

26335,00

4993 Sea

11

17051,71

38 Hamburg

ALEXANDRIA

4990 Sea

39

47586,50

132 Hamburg

ALEXANDRIA

4952 Sea

78

92570,96

367 Hamburg

ALEXANDRIA

4820 Sea

19

238097,03

1272 Shanghai

ALEXANDRIA

4983 Sea

5

83150,00

4842 Sea

81

966107,19

5013 Laem Chabang ALEXANDRIA

4743 Sea

12

76820,00

518 Laem Chabang ALEXANDRIA

3591 Sea

14

22810,00

25 Hamburg

ALEXANDRIA

4992 Sea

6

61927,00

461 Hamburg

ALEXANDRIA

5005 Sea

6

61150,00

461 Antwerpen

ALEXANDRIA

5030 Sea

1

16607,00

67 Rotterdam

ALEXANDRIA

164 Nhava Sheva

DAMIETTA

1 Frankfurt

CAIRO

0 Prag

CAIRO

1 Düsseldorf

CAIRO

386 Hamburg

229 Nhava Sheva

262 Nhava Sheva

ALEXANDRIA

ALEXANDRIA

DAMIETTA

QR0714/12 QR1301/15 #15704925675 QR1003/16 QR1301/16 #15705240222 MS1520/16 MS541/18 #07796229685 MEHUIN #CAD0287833 AF341/09 AF570/10 #05752956363 OS712/15 OS863/16 #02074986446 MS1520/16 MS541/17 #07796229696 MSC PARIS #MSCURK944 313 VIRGINIABOR G #008 VIRGINIABOR G #006 MSC ROSA M #MSCUU9262 876 WIDE ALPHA #MAEU959487 994 MONTE ALEGRE #SGL445374 MONTE ALEGRE #SGL447543 RIO MADEIRA #SGL442903

2017-03-12

2017-03-12

2017-03-15

2017-03-15

2017-03-20

2017-03-21 32MKA

2017-03-16

2017-03-16

2017-03-16

2017-03-16

2017-03-21

2017-03-21 42MBR

2017-03-16

2017-03-16

2017-03-18

2017-03-18

2017-03-23

2017-03-21 00C ; 00EKH; 00URA; 1X; 31CYE; 32UBA; 41MK ; 42MBR; 42MKA; 99UBA

2017-02-27

2017-02-27

2017-03-08

2017-03-09

2017-03-18

2017-03-21 00

2017-03-13

2017-03-13

2017-03-16

2017-03-16

2017-03-21

2017-03-21 20BAT

2017-03-15

2017-03-15

2017-03-16

2017-03-16

2017-03-21

2017-03-21 12MB

2017-03-16

2017-03-16

2017-03-17

2017-03-18

2017-03-22

2017-03-21 00MA

2017-02-22

2017-02-22

2017-03-14

2017-03-13

2017-03-24

2017-03-22 11UBA

2017-02-27

2017-02-28

2017-03-14

2017-03-14

2017-03-24

2017-03-22 11MB

2017-02-28

2017-02-28

2017-03-14

2017-03-14

2017-03-24

2017-03-22 12MBL

2017-01-26

2017-01-30

2017-03-14

2017-03-14

2017-03-24

2017-03-22 11MBL; 12MBL

2017-02-16

2017-02-23

2017-03-10

2017-03-10

2017-03-20

2017-03-23 40URA

2017-03-08

2017-03-08

2017-03-18

2017-03-12

2017-03-28

2017-03-24 10PSB; 11C ; 11MB ; 12C

2017-03-08

2017-03-08

2017-03-18

2017-03-19

2017-03-28

2017-03-24 00; 1X; 20LCA; 20PGB; 2X; 30MA ; 3X; 40MA ; 41; 42

2017-03-01

2017-03-01

2017-03-14

2017-03-14

2017-03-24

MSC ROSA M #MSCUU9267 123 CMA CGM CORNEILLE #CAD0288782 BBC STEINWALL # BBC STEINWALL # MSC ANTIGUA #MSCURU081 718 MSC ANTIGUA #MSCURU123 965 MSC ANTIGUA #MSCURU152 402 MSC LORETTA #MSCURU208 451

2017-01-26

2017-01-30

2017-03-14

2017-03-14

2017-03-24

2017-03-24 00; 10C ; 11MB ; 12MB ; 1X; 20LAC; 20LD ; 2X; 30MA ; 30MKA; 3X; 40MA ; 40MKA 2017-03-25 22UHA

2017-03-06

2017-03-06

2017-03-15

2017-03-16

2017-03-25

2017-03-26 00

2017-02-07

2017-02-07

2017-02-28

2017-02-28

2017-03-10

2017-03-27 42UHA

2017-02-08

2017-02-07

2017-02-28

2017-02-28

2017-03-10

2017-03-27 42MBR

2017-02-28

2017-03-01

2017-03-18

2017-03-19

2017-03-28

2017-03-27 11CYE; 12CYE

2017-03-01

2017-03-01

2017-03-18

2017-03-19

2017-03-28

2017-03-27 11MPB

2017-03-01

2017-03-01

2017-03-18

2017-03-19

2017-03-28

2017-03-27 12MPB

2017-03-06

2017-03-06

2017-03-18

2017-03-19

2017-03-28

2017-03-27 31UHA


5012 Sea

2

30436,00

134 Rotterdam

2951 Air

1

580,00

3 Frankfurt

5081 Air

1

440,00

1 Port of Export CAIRO

5078 Air

2

239,91

1 Incheon

CAIRO

5085 Air

25

10254,91

23 D端sseldorf

CAIRO

2952 Air

1

136,00

1 Frankfurt

CAIRO

4943 Sea

6

144985,00

5067 Air

5

257,40

1 D端sseldorf

CAIRO

5075 Air

1

20,00

0 D端sseldorf

CAIRO

5087 Air

1

140,00

1 D端sseldorf

CAIRO

3590 Sea

4

243,20

1 Hamburg

ALEXANDRIA

3586 Sea

17

5381,13

7 Hamburg

ALEXANDRIA

4843 Sea

13

137257,16

977 Laem Chabang ALEXANDRIA

4844 Sea

13

137257,16

980 Laem Chabang ALEXANDRIA

2953 Air

4

81,21

4915 Sea

6

51181,00

423 Antwerpen

ALEXANDRIA

4960 Sea

9

93207,00

328 Antwerpen

ALEXANDRIA

4911 Sea

2

32565,00

193 Hamburg

ALEXANDRIA

5084 Air

1

395,00

4949 Sea

6

19000,00

153 Hamburg

ALEXANDRIA

4927 Sea

4

62537,41

386 Hamburg

ALEXANDRIA

4961 Sea

2

9353,80

122 Hamburg

ALEXANDRIA

656 Banten

0 Frankfurt

0 Amsterdam

ALEXANDRIA CAIRO

ALEXANDRIA

CAIRO

CAIRO

MSC LORETTA #MSCURU181 658 AF341M/14 AF570/16 #05752956374 EY873/22 EY653/24 #60774254191 EY873/22 EY653/24 #60774253944 LH7105/22 LH8290/23 #02099051514 LH8290/21 #02099051525 BBC HAREN #BANALE-001 AF341/16 AF570/18 #05752956385 LH077/16 LH8290/16 #02099051492 MS1520/16 MS541/17 #07796229711 MSC ANTIGUA #MSCURU134 160 MSC ANTIGUA #MSCURU099 082 BBC STEINWALL # BBC STEINWALL # MS1520/23 MS541/24 #07796229722 VIRGINIABOR G #005 VIRGINIABOR G #004 MSC ANTIGUA #MSCURK943 299 ZZ9541/18 MS541/19 #07796450480 MSC ANTIGUA #MSCURU042 892 MSC ANTIGUA #MSCURU105 913 MSC ANTIGUA #MSCURU067 998

2017-03-06

2017-03-06

2017-03-18

2017-03-19

2017-03-28

2017-03-27 11UHA

2017-03-14

2017-03-14

2017-03-23

2017-03-23

2017-03-28

2017-03-27 00MA

2017-03-22

2017-03-22

2017-03-24

2017-03-24

2017-03-29

2017-03-27 12

2017-03-22

2017-03-22

2017-03-24

2017-03-24

2017-03-29

2017-03-27 00

2017-03-22

2017-03-22

2017-03-23

2017-03-24

2017-03-28

2017-03-21

2017-03-21

2017-03-22

2017-03-22

2017-03-27

2017-03-27 00C ; 00EKH; 10UBA; 10URA; 11C ; 11MB ; 20URA; 30URA; 31MB ; 32MPR; 40URA; 42MB ; 42MKA 2017-03-27 00ABK

2017-02-14

2017-02-13

2017-03-06

2017-03-06

2017-03-16

2017-03-27 40MA

2017-03-16

2017-03-16

2017-03-18

2017-03-18

2017-03-23

2017-03-27 00EKH; 11MB ; 21MK ; 22MK ; 31MB

2017-03-16

2017-03-16

2017-03-16

2017-03-17

2017-03-21

2017-03-27 10MKA

2017-03-16

2017-03-16

2017-03-17

2017-03-18

2017-03-22

2017-03-27 20EKH

2017-03-01

2017-03-01

2017-03-18

2017-03-20

2017-03-28

2017-03-27 11BAA; 12BAA

2017-03-01

2017-03-01

2017-03-19

2017-03-19

2017-03-29

2017-03-27 11BTA; 30MKA; 40MKA

2017-02-07

2017-02-07

2017-02-28

2017-02-28

2017-03-10

2017-03-27 42UHA

2017-02-07

2017-02-07

2017-02-28

2017-02-28

2017-03-10

2017-03-27 41UHA

2017-03-23

2017-03-23

2017-03-24

2017-03-25

2017-03-29

2017-03-27 00MA

2017-02-27

2017-02-28

2017-03-14

2017-03-14

2017-03-24

2017-02-27

2017-02-28

2017-03-14

2017-03-14

2017-03-24

2017-03-28 10BFT; 11C ; 11MBR; 12C ; 12MBR 2017-03-28 12MKC; 20LAC; 20MKC; 40MA

2017-03-01

2017-03-01

2017-03-19

2017-03-19

2017-03-29

2017-03-28 11UBA; 12UBA

2017-03-18

2017-03-18

2017-03-23

2017-03-24

2017-03-28

2017-03-28 00UEN

2017-03-01

2017-03-01

2017-03-19

2017-03-19

2017-03-29

2017-03-28 32UHA

2017-03-01

2017-03-01

2017-03-18

2017-03-20

2017-03-28

2017-03-28 12UBA

2017-03-01

2017-03-01

2017-03-19

2017-03-19

2017-03-29

2017-03-28 11CYE; 12CYE


5000 Sea

4

65321,00

268 Rotterdam

ALEXANDRIA

4879 Sea

49

77540,00

405 Hamburg

ALEXANDRIA

4964 Sea

97

39416,00

758 Hamburg

ALEXANDRIA

4872 Sea

29

27300,00

64 Busan

ALEXANDRIA

4893 Sea

12

161400,20

803 Busan

ALEXANDRIA

3589 Sea

6

6205,00

18 Hamburg

5107 Air

1

1988,00

6 Istanbul

CAIRO

5095 Air

5

314,00

2 Amsterdam

CAIRO

5079 Air

2

9310,00

2946 Sea

1

2,55

0 Blexen

ALEXANDRIA

4991 Sea

1

395200,00

240 Blexen

ALEXANDRIA

5004 Sea

1

8015,00

86 Hamburg

ALEXANDRIA

4963 Sea

20

13684,00

60 Hamburg

ALEXANDRIA

4971 Sea

3

4600,00

15 Hamburg

ALEXANDRIA

4999 Sea

3

2200,00

19 Hamburg

ALEXANDRIA

4979 Sea

4

6191,00

14 Hamburg

ALEXANDRIA

5102 Air

2

24,90

5103 Air

2

4959 Sea

3588 Sea

28 Incheon

ALEXANDRIA

CAIRO

0 Prag

CAIRO

1824,00

2 Genua

CAIRO

1

8636,00

67 Houston

2

480,00

2 Hamburg

ALEXANDRIA

ALEXANDRIA

MSC LORETTA #MSCURU152 618 HS PARIS #SGL433479 HS PARIS #SGL442518 COSCO HARMONY #SEL0668527 COSCO HARMONY #SEL0668589 MSC ADELAIDE #MSCURU156 783 MB200/25 #71699867574 MB224/24 MB061/25 #71631402070 CV6916/25 CV8501/27 #17219362733 NORDERSAND #NORD-BLEBUR-2A NORDERSAND #NORD-BLEBUR-2A MSC ADELAIDE #MSCURU181 872 MSC ADELAIDE #MSCURU098 860 MSC ADELAIDE #MSCURU083 318 MSC ADELAIDE #MSCURU179 900 MSC ADELAIDE #MSCURU114 766 LH7431S/27 LH8290/28 #02074986586 CV9953/24 CV8501/27 #17218756496 SESPAN SAIGON #HLCUHOU17 0254730 MSC ADELAIDE #MSCURU154 796

2017-03-06

2017-03-06

2017-03-18

2017-03-19

2017-03-28

2017-03-29 31UHA

2017-03-15

2017-03-15

2017-03-25

2017-03-25

2017-04-04

2017-03-30 11BAT; 12BAT

2017-03-15

2017-03-15

2017-03-25

2017-03-25

2017-04-04

2017-03-30 11BAA; 12BAA

2017-02-16

2017-02-15

2017-03-22

2017-03-23

2017-04-01

2017-03-31 30; 31; 32

2017-02-16

2017-02-15

2017-03-22

2017-03-23

2017-04-01

2017-04-01 31UHA

2017-03-08

2017-03-10

2017-03-27

2017-03-27

2017-04-06

2017-04-02 00

2017-03-25

2017-03-25

2017-03-25

2017-03-26

2017-03-30

2017-04-02 21SGC

2017-03-24

2017-03-24

2017-03-26

2017-03-26

2017-03-31

2017-04-02 20; 30; 31; 32

2017-03-25

2017-03-25

2017-03-28

2017-03-28

2017-04-02

2017-04-02 00

2017-03-01

2017-03-02

2017-03-20

2017-03-20

2017-03-30

2017-04-03 30MK

2017-03-01

2017-03-02

2017-03-18

2017-03-20

2017-03-28

2017-04-03 30MKA

2017-03-08

2017-03-10

2017-03-27

2017-03-27

2017-04-06

2017-04-03 00URA

2017-03-08

2017-03-10

2017-03-27

2017-03-27

2017-04-06

2017-04-03 11BAA; 12BAA

2017-03-08

2017-03-10

2017-03-27

2017-03-27

2017-04-06

2017-04-03 30PAA

2017-03-08

2017-03-10

2017-03-27

2017-03-27

2017-04-06

2017-04-03 41MBR

2017-03-08

2017-03-10

2017-03-27

2017-03-27

2017-04-06

2017-04-03 11CYE; 12CYE

2017-03-27

2017-03-27

2017-03-30

2017-03-31

2017-04-04

2017-04-03 41MB ; 42MB

2017-03-24

2017-03-24

2017-03-28

2017-03-28

2017-04-02

2017-04-03 00URA

2017-02-25

2017-02-27

2017-03-28

2017-03-28

2017-04-07

2017-04-03 31UHA

2017-03-08

2017-03-10

2017-03-27

2017-03-27

2017-04-06

2017-04-03 00


4954 Sea

30

9241,00

30 Hamburg

2955 Air

1

330,00

1 Frankfurt

CAIRO

5109 Air

3

562,00

3 Prag

CAIRO

3595 Air

2

12,54

0 Frankfurt

CAIRO

5111 Air

1

20,00

0 Düsseldorf

CAIRO

5093 Air

12

543,11

4 Düsseldorf

CAIRO

5106 Air

1

1,50

0 Wien

CAIRO

5112 Air

2

70,50

0 Amsterdam

CAIRO

3587 Sea

1

35,65

0 Rijeka

ALEXANDRIA

4795 Sea

7

83682,21

469 Shanghai

ALEXANDRIA

4980 Sea

199

197035,00

405 Hamburg

ALEXANDRIA

4962 Sea

15

19575,92

5002 Sea

18

44586,00

3599 Air

1

22,70

5123 Air

1

3597 Air

98 Rijeka 248 Izmir

ALEXANDRIA

ALEXANDRIA ALEXANDRIA

0 Prag

CAIRO

232,00

1 Amsterdam

CAIRO

1

321,00

1 Brüssel

CAIRO

5015 Sea

5

81660,00

4789 Sea

2

510,00

2 Shanghai

ALEXANDRIA

4788 Sea

2

36701,32

159 Shanghai

ALEXANDRIA

5056 Sea

1

8430,00

77 Hamburg

ALEXANDRIA

262 Nhava Sheva

DAMIETTA

MSC ADELAIDE #MSCURU192 549 MS1520/28 MS541/29 #07796229744 KL8550/28 MP8140/30 #07453802070 AF341/22 AF570/24 #05752956396 MS1520/28 MS541/29 #07796229733 AF341M/29 AF570/31 #05752956400 OS129/30 LH8290/30 #02074962145 MB724/30 MB201/01 #71631396643 AS CYPRIA #RJK0112017 MSC LA SPEZIA #MSCUU9353 683 MSC ADELAIDE #MSCURU172 210 AS CYPRIA #RJK0112010 MSC MIRELLA #MSCURU190 212 EK140/31 EK927/02 #17634870124 MS5134/01 MS521/02 #07796399671 MS521/30 #07796173593 SUEZ CANAL #CAD0289671 MSC BETTINA #MSCUU9430 291 MSC BETTINA #MSCUU9430 317 MSC ALTAMIRA #MSCURU257 227

2017-03-08

2017-03-10

2017-03-27

2017-03-27

2017-04-06

2017-04-03 00

2017-03-28

2017-03-28

2017-03-29

2017-03-29

2017-04-03

2017-04-04 30MA

2017-03-28

2017-03-28

2017-03-30

2017-03-30

2017-04-04

2017-04-04 30BAA

2017-03-28

2017-03-28

2017-03-31

2017-04-01

2017-04-05

2017-04-04 00URA

2017-03-28

2017-03-28

2017-03-29

2017-03-29

2017-04-03

2017-04-04 22MBR

2017-03-29

2017-03-29

2017-03-31

2017-04-01

2017-04-05

2017-04-04 00URA; 10UBA; 11UBA; 20UBA; 21UBA; 22MB ; 22UBA; 31UBA; 42MB

2017-03-30

2017-03-30

2017-03-30

2017-03-30

2017-04-04

2017-04-04 10PAB

2017-03-30

2017-03-30

2017-04-01

2017-04-02

2017-04-06

2017-04-04 00UEN

2017-03-14

2017-03-15

2017-03-29

2017-03-28

2017-04-08

2017-04-04 20BAT

2017-02-02

2017-02-06

2017-03-28

2017-03-28

2017-04-07

2017-04-05 12UHA

2017-03-08

2017-03-10

2017-03-27

2017-03-27

2017-04-06

2017-04-05 00

2017-03-14

2017-03-15

2017-03-29

2017-03-28

2017-04-08

2017-04-05 20BAT

2017-03-02

2017-03-04

2017-04-01

2017-03-29

2017-04-11

2017-04-06 30URA; 40URA

2017-03-31

2017-03-31

2017-04-02

2017-04-02

2017-04-07

2017-04-06 30BAA

2017-04-02

2017-04-02

2017-04-02

2017-04-02

2017-04-07

2017-04-06 11UHA

2017-03-30

2017-03-30

2017-03-30

2017-03-30

2017-04-04

2017-04-06 11UHA

2017-03-20

2017-03-20

2017-03-29

2017-03-29

2017-04-08

2017-04-07 00

2017-02-18

2017-02-20

2017-04-03

2017-04-03

2017-04-13

2017-04-07 11MBL; 12MBL

2017-02-18

2017-02-20

2017-04-03

2017-04-03

2017-04-13

2017-04-07 11MBL; 12MBL

2017-03-15

2017-03-15

2017-04-02

2017-04-02

2017-04-12

2017-04-08 20UBA


5036 Sea

1

1606,00

4 Hamburg

ALEXANDRIA

5135 Air

1

10,00

0 Wien

CAIRO

5136 Air

11

7621,00

4968 Sea

3

41994,06

289 Hamburg

ALEXANDRIA

4947 Sea

5

67670,00

482 Hamburg

ALEXANDRIA

4946 Sea

1

11700,00

96 Hamburg

ALEXANDRIA

5066 Sea

3

41647,00

201 Rotterdam

ALEXANDRIA

4972 Sea

9

211502,91

318 Shanghai

ALEXANDRIA

5010 Sea

93

58035,57

170 Hamburg

ALEXANDRIA

5108 Air

12

3630,87

9 Düsseldorf

CAIRO

5116 Air

1

1230,00

15 Düsseldorf

CAIRO

3600 Air

4

386,70

2 Frankfurt

CAIRO

4832 Sea

3

1935,00

3 Shanghai

ALEXANDRIA

4869 Sea

4

52396,00

268 Shanghai

ALEXANDRIA

4905 Sea

2

27385,37

134 Shanghai

ALEXANDRIA

4969 Sea

2

33144,00

134 Shanghai

ALEXANDRIA

4995 Sea

1

10219,70

76 Shanghai

ALEXANDRIA

5134 Air

6

6468,00

4860 Sea

5

72581,30

343 Shanghai

ALEXANDRIA

4786 Sea

39

21282,00

42 Shanghai

ALEXANDRIA

10 Amsterdam

3 Düsseldorf

CAIRO

CAIRO

MSC ALTAMIRA #MSCURU208 881 QR184 QR1301 #15755269885 MP8140/06 #07455762206 MSC ALTAMIRA #MSCURU240 702 MSC ALTAMIRA #MSCURU041 183 MSC ALTAMIRA #MSCURU041 639 E.R. YOKOHAMA #MSCURU327 970 EVER CHIVARLY #EGLV142751 543201 RIO BLANCO #SGL449011

2017-03-15

2017-03-15

2017-04-02

2017-04-02

2017-04-12

2017-04-08 11CYE

2017-04-04

2017-04-04

2017-04-05

2017-04-05

2017-04-10

2017-04-08 32CYE

2017-04-06

2017-04-06

2017-04-06

2017-04-06

2017-04-11

2017-04-08 11UHA

2017-03-15

2017-03-15

2017-04-02

2017-04-02

2017-04-12

2017-04-09 20UBA; 21UBA; 22UBA

2017-03-15

2017-03-15

2017-04-02

2017-04-02

2017-04-12

2017-04-09 20UBA

2017-03-15

2017-03-15

2017-04-02

2017-04-02

2017-04-12

2017-04-09 20UBA

2017-03-20

2017-03-20

2017-04-02

2017-04-02

2017-04-12

2017-04-09 11UHA

2017-03-05

2017-03-06

2017-03-31

2017-03-31

2017-04-10

2017-04-10 00

2017-03-22

2017-03-22

2017-04-02

2017-04-02

2017-04-12

AF341M/03 AF570/04 #05752956411 LH7105S/05 LH8290/06 #02099051584 AF341/31 AF570/03 #05752956422 MSC GAIA #MSCUU9574 783 MSC BETTINA #MSCUU9436 801 MSC IRENE #MSCUU9530 397 MSC GAIA #MSCUU9569 973 MSC GAIA #MSCUU9574 775 LH7105S + LH8290 #02099051595 MSC BETTINA #MSCUU9430 283 MSC BETTINA #MSCUU9430 309

2017-04-04

2017-04-04

2017-04-05

2017-04-05

2017-04-10

2017-04-10 01LD ; 10QCL; 11MB ; 12MB ; 20QCL; 2X; 30MA ; 30QCL; 3X; 40; 40LBG; 40QCB; 40QCL; 4x; xxLBG 2017-04-10 00BRU; 00EKH; 11UHA; 22MB ; 41MB ; 41MK ; 42MB ; 42MBR

2017-04-05

2017-04-05

2017-04-06

2017-04-07

2017-04-11

2017-04-10 00URA

2017-03-31

2017-03-31

2017-04-05

2017-04-07

2017-04-10

2017-04-10 00URA

2017-02-12

2017-03-03

2017-04-03

2017-04-03

2017-04-13

2017-04-11 4x

2017-02-18

2017-02-20

2017-04-03

2017-04-03

2017-04-13

2017-04-11 32UHA

2017-02-25

2017-02-27

2017-04-03

2017-04-03

2017-04-13

2017-04-11 32UHA

2017-03-02

2017-03-03

2017-04-03

2017-04-03

2017-04-13

2017-04-11 11UHA

2017-03-03

2017-03-03

2017-04-03

2017-04-03

2017-04-13

2017-04-11 42UHA

2017-04-05

2017-04-05

2017-04-10

2017-04-10

2017-04-15

2017-04-11 22MBR

2017-02-18

2017-03-20

2017-04-03

2017-04-03

2017-04-13

2017-04-11 41UHA

2017-02-18

2017-02-20

2017-04-03

2017-04-03

2017-04-13

2017-04-11 3x; 4x


4933 Sea

4

62709,60

268 Shanghai

ALEXANDRIA

4923 Sea

5

41336,40

335 Shanghai

ALEXANDRIA

5011 Sea

10

27880,00

71 Gemlik

ALEXANDRIA

4953 Sea

1

9048,00

67 Busan

ALEXANDRIA

4934 Sea

3

5929,06

40 Busan

ALEXANDRIA

4942 Sea

3

19329,64

48 Busan

ALEXANDRIA

4709 Sea

25

87648,00

5034 Sea

2

12480,00

4871 Sea

5

29396,00

150 Antwerpen

ALEXANDRIA

4976 Sea

2

24985,00

83 Antwerpen

ALEXANDRIA

5128 Air

3

693,20

5 Düsseldorf

5016 Sea

2

9375,00

44 Antwerpen

ALEXANDRIA

5013 Sea

6

35315,00

222 Antwerpen

ALEXANDRIA

5045 Sea

1

13100,00

66 Antwerpen

ALEXANDRIA

5052 Sea

2

11075,00

48 Antwerpen

ALEXANDRIA

4982 Sea

2

7221,00

85 Hamburg

ALEXANDRIA

5119 Air

1

25,00

2956 Air

1

315,00

5145 Air

1

5154 Air 5076 Air

130 Shanghai 93 Ho Chi Minh Port

ALEXANDRIA ALEXANDRIA

CAIRO

0 Incheon

CAIRO

3 Frankfurt

CAIRO

1,00

0 Amsterdam

CAIRO

1

0,20

0 Wien

CAIRO

1

333,22

4 Sao Paulo

CAIRO

5025 Sea

95

89221,00

396 Hamburg

ALEXANDRIA

5048 Sea

2

3758,00

9 Hamburg

ALEXANDRIA

5022 Sea

4

18800,00

154 Hamburg

ALEXANDRIA

2949 Sea

2

2604,00

12 Hamburg

ALEXANDRIA

MSC IRENE #MSCUU9530 389 MSC IRENE #MSCUU9530 405 MSC MIRELLA #MSCURU178 449 COSCO HOPE #SEL0671741 MSC GAIA #MSCUKU704 215 MSC GAIA #MSCUKU704 108 CP MOON #CPJQMN67S HAEDK02 ITAL UNIVERSO #YMLUM4903 03105 CELEBRATION #025 CELEBRATION #020 KL8440/07 MP8910/10 #07453010613 CELEBRATION #023 CELEBRATION #022 CELEBRATION #021 CELEBRATION #033 CELEBRATION #024 QR859/06 QR1303/07 #15703269383 AF341/07 AF570/8 #05752956433 MP8910/10 #07455762593 MS798/08 #07792598531 LH8273/30 LH8290/06 #02094546115 MSC SINDY #MSCURU341 864 MSC SINDY #MSCURU263 621 RIO BLANCO #SGL450288 MSC SINDY #MSCURU275 799

2017-02-25

2017-02-27

2017-04-03

2017-04-04

2017-04-13

2017-04-11 42UHA

2017-02-25

2017-02-27

2017-04-03

2017-04-03

2017-04-13

2017-04-12 31UHA

2017-03-19

2017-03-19

2017-04-06

2017-04-07

2017-04-16

2017-04-12 40

2017-03-02

2017-03-02

2017-04-08

2017-04-08

2017-04-18

2017-04-12 32UHA

2017-02-26

2017-02-26

2017-04-03

2017-04-03

2017-04-13

2017-04-12 00

2017-02-26

2017-02-26

2017-04-03

2017-04-03

2017-04-13

2017-04-12 00

2017-03-02

2017-03-03

2017-04-03

2017-04-03

2017-04-13

2017-04-13 11BBT; 12BBT

2017-03-14

2017-03-14

2017-04-07

2017-04-07

2017-04-17

2017-04-13 41UHA

2017-03-22

2017-03-22

2017-04-06

2017-04-03

2017-04-16

2017-04-13 30MA

2017-03-22

2017-03-22

2017-04-06

2017-04-03

2017-04-16

2017-04-13 10PAC; 40MA

2017-04-07

2017-04-07

2017-04-10

2017-04-11

2017-04-15

2017-04-13 00UBA; 31MPR; 99UBA

2017-03-22

2017-03-22

2017-04-06

2017-04-03

2017-04-16

2017-04-14 20BFT

2017-03-22

2017-03-22

2017-04-06

2017-04-03

2017-04-16

2017-04-14 20PAC

2017-03-22

2017-03-22

2017-04-06

2017-04-03

2017-04-16

2017-04-14 30MA

2017-03-22

2017-03-22

2017-04-06

2017-04-03

2017-04-16

2017-04-14 10PAH

2017-03-22

2017-03-22

2017-04-06

2017-04-03

2017-04-16

2017-04-14 20QU

2017-04-06

2017-04-06

2017-04-07

2017-04-07

2017-04-12

2017-04-14 11UHA

2017-04-07

2017-04-07

2017-04-08

2017-04-09

2017-04-13

2017-04-14 00MA

2017-04-10

2017-04-10

2017-04-10

2017-04-11

2017-04-15

2017-04-14 00UEN

2017-04-08

2017-04-08

2017-04-08

2017-04-08

2017-04-13

2017-04-14 99UBA

2017-03-30

2017-03-30

2017-04-06

2017-04-07

2017-04-11

2017-04-14 40URA

2017-03-22

2017-03-23

2017-04-09

2017-04-09

2017-04-19

2017-03-22

2017-03-23

2017-04-08

2017-04-09

2017-04-18

2017-04-15 00; 02LD ; 10C ; 1X; 20BTA; 20C ; 2X; 30LBF; 30MA ; 3X; 40MA ; 40MKA; 4X 2017-04-15 20PGB

2017-03-29

2017-03-29

2017-04-08

2017-04-09

2017-04-18

2017-03-22

2017-03-23

2017-04-08

2017-04-09

2017-04-18

2017-04-15 10QCD; 20QCD; 30QCD; 40QCD 2017-04-15 00MK


4924 Sea

12

187476,19

803 Shanghai

ALEXANDRIA

5064 Sea

4

44292,20

308 Hamburg

ALEXANDRIA

5065 Sea

2

15287,80

154 Hamburg

ALEXANDRIA

4977 Sea

12

60749,00

102 Hamburg

ALEXANDRIA

5028 Sea

3

4600,00

15 Hamburg

ALEXANDRIA

5006 Sea

48

128664,00

358 Antwerpen

ALEXANDRIA

3594 Sea

12

2552,55

4 Hamburg

ALEXANDRIA

5041 Sea

12

89875,00

803 Hamburg

ALEXANDRIA

5139 Air

6

535,20

4 Düsseldorf

CAIRO

3570 Sea

1

270,00

1 Shanghai

ALEXANDRIA

5042 Sea

3

51678,00

5130 Air

7

17639,00

5159 Air

1

980,00

3 Düsseldorf

CAIRO

5148 Air

1

544,00

1 Wien

CAIRO

5158 Air

3

1078,32

2 Düsseldorf

CAIRO

5168 Air

1

5,72

0 Berlin

CAIRO

5164 Air

1

2,06

0 Prag

CAIRO

5149 Air

14

10548,20

32 Düsseldorf

CAIRO

5156 Air

1

740,00

1 Düsseldorf

CAIRO

5160 Air

2

6,95

0 Prag

CAIRO

5161 Air

1

178,00

0 Düsseldorf

CAIRO

157 Nhava Sheva 40 Incheon

DAMIETTA CAIRO

CP MOON #CPJQMN67S HAEDK51 MSC SINDY #MSCURU330 404 MSC SINDY #MSCURU330 586 MSC SINDY #MSCURU118 817 MSC SINDY #MSCURU245 214 RIO DE LA PLATA #SGL447980 MSC SINDY #MSCURU352 325 MSC SINDY #MSCURU264 652 LH7105S/12 LH8290/13 # AL DHAIL #CNSHA68704 6 PRIORITY #CAD0290497 CV6916/08 CV8501/10 #17219362932 LH7105/10 LH8290/11 #02099051702 MS9537T/07 MS541/12 #07792598542 MS1520/13 MS541/14 #07796229766 MS732/14 #07796229770 LH1397/15 LH8290/16 #02074986822 KL8440/12 MP8910/17 #07453010624 LH7105S712 LH8290/13 #02099051680 LH7431S/15 LH8290/16 #02074986833 LH8290/13 #02099051724

2017-03-01

2017-03-03

2017-04-03

2017-04-03

2017-04-13

2017-04-15 31UHA

2017-03-22

2017-03-23

2017-04-08

2017-04-09

2017-04-18

2017-04-15 11MB ; 12MB

2017-03-22

2017-03-23

2017-04-08

2017-04-09

2017-04-18

2017-04-15 11MB ; 12MB

2017-03-22

2017-03-23

2017-04-09

2017-04-09

2017-04-19

2017-04-16 40MA

2017-03-22

2017-03-23

2017-04-08

2017-04-09

2017-04-18

2017-04-16 20PAA

2017-03-29

2017-03-29

2017-04-08

2017-04-09

2017-04-18

2017-04-16 11MPB; 12MPB

2017-03-22

2017-03-23

2017-04-08

2017-04-09

2017-04-18

2017-04-16 10MA ; 20BTA; 40MKA

2017-03-22

2017-03-23

2017-04-08

2017-04-09

2017-04-18

2017-04-17 32UHA

2017-04-12

2017-04-12

2017-04-13

2017-04-14

2017-04-18

2017-03-11

2017-03-11

2017-04-13

2017-04-13

2017-04-23

2017-04-17 00MA ; 11MB ; 40EKH; 42MB ; XX 2017-04-19 12BBT

2017-03-27

2017-03-27

2017-04-05

2017-04-07

2017-04-15

2017-04-20 00

2017-04-10

2017-04-08

2017-04-17

2017-04-18

2017-04-22

2017-04-20 00

2017-04-11

2017-04-12

2017-04-12

2017-04-14

2017-04-17

2017-04-20 10MA

2017-04-07

2017-04-07

2017-04-12

2017-04-12

2017-04-17

2017-04-20 11CYE

2017-04-13

2017-04-13

2017-04-14

2017-04-14

2017-04-19

2017-04-21 10MA ; 42MB

2017-04-14

2017-04-14

2017-04-18

2017-04-18

2017-04-23

2017-04-21 42MB

2017-04-15

2017-04-15

2017-04-19

2017-04-19

2017-04-24

2017-04-21 42MB

2017-04-12

2017-04-12

2017-04-17

2017-04-17

2017-04-22

2017-04-21 00C ; 00MA ; 00URA; 10C ; 11C ; 12C ; 1X; 20EKH; 2X; 32MKA; 42C

2017-04-12

2017-04-12

2017-04-13

2017-04-14

2017-04-18

2017-04-21 22MBR

2017-04-15

2017-04-15

2017-04-19

2017-04-19

2017-04-24

2017-04-21 41MB

2017-04-13

2017-04-13

2017-04-13

2017-04-14

2017-04-18

2017-04-21 42MB


5155 Air

1

14,00

0 Frankfurt

4862 Sea

5

85493,10

339 Shanghai

ALEXANDRIA

5073 Sea

3

30064,68

157 Nhava Sheva

ALEXANDRIA

5090 Sea

3

6150,00

27 Hamburg

ALEXANDRIA

5060 Sea

74

112488,34

665 Hamburg

ALEXANDRIA

5063 Sea

102 Jebel Ali

ALEXANDRIA

10

7960,00

5171 Air

1

4,20

5157 Air

1

5009 Sea

CAIRO

0 Wien

CAIRO

69,00

0 Milano

CAIRO

12

162760,30

803 Busan

ALEXANDRIA

5032 Sea

5

41726,40

335 Shanghai

ALEXANDRIA

5099 Sea

3

227000,00

298 3rd May Shipyard

BURULLUS

5071 Sea

2

20968,00

154 Hamburg

ALEXANDRIA

4914 Sea

6

26480,00

29 Ulsan

ALEXANDRIA

4917 Sea

3

20820,00

42 Ulsan

ALEXANDRIA

5021 Sea

1

9008,00

67 Busan

ALEXANDRIA

5033 Sea

2

27127,42

5014 Sea

6

2816,00

8 Chennai

ALEXANDRIA

5058 Sea

1

8636,00

67 Houston

ALEXANDRIA

5172 Air

1

23,00

5163 Air

5

343,94

5185 Air

1

2,16

134 Shanghai

ALEXANDRIA

0 Amsterdam

CAIRO

2 Düsseldorf

CAIRO

0 Frankfurt

CAIRO

MS1520/13 MS541/14 #07796229755 CP MOON #CPJQMN67S HAEDK01 MAIPO #CAD0291809 MSC MARIANNA #MSCURU371 416 MSC MARIANNA #MSCURU383 163 UASC YAS #DXB0353567 MS798/20 #07792598634 QR8445/15 QR1301/17 #15705773493 MSC LIVORNO #MSCUKU723 595 MSC LIVORNO #MSCUU9682 966 SCHILLPLATE #SCHIL_RIJ_B UR MSC MARIANNA #MSCURU378 759 DA TONG YUNG #ULSALX-4914 DA TONG YUN # MSC LIVORNO #MSCUKU723 546 MSC LIVORNO #MSCUU9682 974 NORTHERN PRIORITY #YMLUM5150 68635 NORTHERN DECENCY #HLCUHOU17 0360448 MS758/21 #07796402493 MS1520/21 MS541/23 #07796229781 LH1246/22 OS863/23 #02099051783

2017-04-13

2017-04-13

2017-04-14

2017-04-14

2017-04-19

2017-04-21 00ABA

2017-03-02

2017-03-03

2017-04-03

2017-04-03

2017-04-13

2017-04-22 41UHA

2017-04-03

2017-04-04

2017-04-13

2017-04-15

2017-04-23

2017-04-22 00

2017-03-29

2017-03-31

2017-04-15

2017-04-17

2017-04-25

2017-04-24 20LAC

2017-03-29

2017-03-31

2017-04-16

2017-04-17

2017-04-26

2017-04-25 00C ; 02LD ; 12MB ; 20C ; 21C ; 22C ; 22MB ; 30LD ; 30MA ; 3X; 40LD ; 40MKA; 4X

2017-03-29

2017-03-29

2017-04-23

2017-04-23

2017-05-03

2017-04-25 22MBR

2017-04-20

2017-04-20

2017-04-20

2017-04-20

2017-04-25

2017-04-25 41CYE

2017-04-15

2017-04-15

2017-04-17

2017-04-16

2017-04-22

2017-04-25 00URA

2017-03-12

2017-03-12

2017-04-18

2017-04-18

2017-04-28

2017-04-26 32UHA

2017-03-17

2017-03-17

2017-04-18

2017-04-18

2017-04-28

2017-04-26 32UHA

2017-04-18

2017-04-18

2017-04-24

2017-04-25

2017-05-04

2017-04-26 30BAT

2017-03-29

2017-03-31

2017-04-15

2017-04-17

2017-04-25

2017-04-26 10MA ; 30MA

2017-02-27

2017-03-04

2017-04-18

2017-04-19

2017-04-28

2017-04-27 41UHA

2017-02-28

2017-03-04

2017-04-18

2017-04-19

2017-04-28

2017-04-27 20LCB

2017-03-12

2017-03-12

2017-04-18

2017-04-18

2017-04-28

2017-04-27 41UHA

2017-03-17

2017-03-17

2017-04-17

2017-04-18

2017-04-27

2017-04-27 41UHA

2017-03-18

2017-03-19

2017-04-23

2017-04-20

2017-05-03

2017-04-27 41UHA

2017-03-26

2017-03-26

2017-04-21

2017-04-22

2017-05-01

2017-04-27 32UHA

2017-04-21

2017-04-21

2017-04-21

2017-04-23

2017-04-26

2017-04-28 11UHA

2017-04-21

2017-04-21

2017-04-24

2017-04-24

2017-04-29

2017-04-28 20MA ; 32MKA; 41MK ; 42MB ; 42MKA

2017-04-22

2017-04-22

2017-04-23

2017-04-23

2017-04-28

2017-04-28 32UBA


5190 Air

3

846,00

7 Frankfurt

CAIRO

5191 Air

1

72,00

1 Prag

CAIRO

4913 Sea

24

3086000,00

5117 Sea

1

11064,00

5072 Sea

53

73418,20

5125 Sea

1

14224,00

67 Rotterdam

5174 Air

3

204,97

2 D端sseldorf

5173 Air

1

829,00

1 Incheon

5096 Sea

24

7966,00

2950 Sea

1

1670,00

5114 Sea

4

367000,00

630 Rotterdam

5196 Air

1

100,00

0 D端sseldorf

5089 Sea

1

5000,00

19 Felixstowe

ALEXANDRIA

5100 Sea

3

56600,00

91 Rotterdam

BURULLUS

5126 Sea

4

20020,00

85 Antwerpen

ALEXANDRIA

5187 Air

7

3960,20

4 D端sseldorf

CAIRO

5202 Air

1

90,00

0 D端sseldorf

CAIRO

5077 Sea

1

6300,00

43 Antwerpen

ALEXANDRIA

5083 Sea

5

35200,00

221 Antwerpen

ALEXANDRIA

5113 Sea 5110 Sea

12 16

89445,00 27888,00

803 Hamburg 57 Chennai

ALEXANDRIA DAMIETTA

2954 Sea

1

2,55

0 Rotterdam

BURULLUS

5118 Sea

1

395000,00

240 Rotterdam

BURULLUS

6490 Ulsan 86 Rotterdam 241 Hamburg

19 Rotterdam

ALEXANDRIA ALEXANDRIA ALEXANDRIA ALEXANDRIA

CAIRO

ALEXANDRIA

8 Southampton/ ALEXANDRIA Felixtow BURULLUS CAIRO

MS1584/26 MS541/26 #07796229792 EK140/27 EK925/28 #17634870345 DA TONG YUNG #ULSALX-4913 MSC LORETTA #MSCURU457 686 MSC BILBAO #MSCURU431 111 MSC LORETTA #MSCURU474 046 AF341M/26 AF570/28 #05752956444 EY873/27 EY653/28 #60775032322 MSC BILBAO #MSCURU408 283 MSC LORETTA #MSCURU367 760 ACCUM #ACCU-ROTBUR-2 MS1596/28 MS541/30 #07796229814 MSC LORETTA #MSCURU447 919 ACCUM #ACCU-ROTBUR-3 LADY DEBORA #024 MS1520/28 MS541/30 #07796229803 MS1520/04 MS541/05 #07796229825 LADY DEBORA #021 LADY DEBORA #023 MSC SEATTLE CMA CGM PUCCINI #AAK0120893 ACCUM #ACCU-ROTBUR-1B ACCUM #ACCU-ROTBUR-1A

2017-04-26

2017-04-26

2017-04-26

2017-04-26

2017-05-01

2017-04-29 42MB

2017-04-27

2017-04-26

2017-04-28

2017-04-28

2017-05-03

2017-04-29 42MB

2017-02-27

2017-03-04

2017-04-18

2017-04-19

2017-04-28

2017-04-30 41UHA

2017-04-10

2017-04-10

2017-04-26

2017-04-26

2017-05-06

2017-04-30 22MBR

2017-04-05

2017-04-06

2017-04-26

2017-04-26

2017-05-06

2017-04-10

2017-04-10

2017-04-26

2017-04-26

2017-05-06

2017-05-03 00; 00C ; 01LD ; 20LAC; 30LCL; 30MA ; 3X; 40MA ; 40MKA; 41; 42; 4X 2017-05-03 11UHA

2017-04-26

2017-04-26

2017-04-28

2017-04-27

2017-05-03

2017-05-03 00URA; 30UBA; 42MKA

2017-04-27

2017-04-27

2017-04-28

2017-04-28

2017-05-03

2017-05-03 11UHA

2017-04-05

2017-04-06

2017-04-26

2017-04-26

2017-05-06

2017-05-04 00; 40; 41; 42

2017-04-06

2017-04-07

2017-04-26

2017-04-26

2017-05-06

2017-05-04 00ABK

2017-04-20

2017-04-20

2017-05-04

2017-05-04

2017-05-14

2017-05-05 30MA

2017-04-28

2017-04-28

2017-04-30

2017-04-30

2017-05-05

2017-05-05 42MB

2017-04-06

2017-04-07

2017-04-26

2017-04-26

2017-05-06

2017-05-05 00

2017-04-20

2017-04-20

2017-05-04

2017-05-04

2017-05-14

2017-05-05 30MA

2017-04-10

2017-04-11

2017-04-26

2017-04-25

2017-05-06

2017-05-07 30MKC; 40MKC

2017-04-28

2017-04-28

2017-04-30

2017-04-30

2017-05-05

2017-05-07 00; 10MA ; XX

2017-05-04

2017-05-04

2017-05-05

2017-05-05

2017-05-10

2017-05-07 31MB

2017-04-10

2017-04-11

2017-04-26

2017-04-25

2017-05-06

2017-05-07 11BAC

2017-04-10

2017-04-11

2017-04-26

2017-04-25

2017-05-06

2017-05-07 30PAC

2017-04-12 2017-04-16

2017-04-15 2017-04-16

2017-05-01 2017-04-28

2017-05-01 2017-04-28

2017-05-11 2017-05-08

2017-05-08 41UHA 2017-05-08 41UHA

2017-04-20

2017-04-20

2017-05-04

2017-05-04

2017-05-14

2017-05-08 40MKA

2017-04-20

2017-04-20

2017-05-04

2017-05-04

2017-05-14

2017-05-08 40MKA


5049 Sea

17

24450,00

5129 Sea

67 Busan 166 Hamburg

ALEXANDRIA

53

46677,00

5206 Air

3

216,00

ALEXANDRIA

5192 Air

1

1143,00

9005 Air

5

2175,40

5211 Air

3

825,00

6 Frankfurt

CAIRO

3596 Sea

17

436,23

2 Hamburg

ALEXANDRIA

5104 Sea

97

120176,00

372 Hamburg

ALEXANDRIA

5120 Sea

6

97497,78

402 Shanghai

ALEXANDRIA

5121 Sea

2

27247,42

134 Shanghai

ALEXANDRIA

2 Prag

CAIRO

1 Incheon

CAIRO

14 Frankfurt/Airp CAIRO ort

5115 Sea

1

4511,79

26 Busan

ALEXANDRIA

5105 Sea

12

162232,30

803 Busan

ALEXANDRIA

5194 Air

6

739,29

5188 Air

3

5205 Air

4 Düsseldorf

CAIRO

3611,00

6 Incheon

CAIRO

21

3714,00

9 Amsterdam

CAIRO

5209 Air

1

0,80

0 Wien

CAIRO

5213 Air

1

130,00

1 Düsseldorf

CAIRO

5101 Sea

6

19000,00

153 Hamburg

5221 Air

6

1650,00

12 Frankfurt

5091 Sea

5

41206,40

335 Shanghai

ALEXANDRIA

5051 Sea

6

101028,80

402 Shanghai

ALEXANDRIA

5043 Sea

3

59529,00

104 Shanghai

ALEXANDRIA

ALEXANDRIA CAIRO

MSC TERESA #MSCUKU746 042 HS PARIS #SGL468168 EK140/04 EK923/05 #17634870415 EY873/04 EY653/05 #60775035590 LH8290/07 #02099051794 MS1584/06 MS541/07 #07796229836 MSC SEATTLE #MSCURU489 036 MSC SEATTLE # MSCURU4882 69 TIRUA #YMLUM2314 44319 TIRUA #YMLUM2314 44318 APL OREGON #SEL0679868 APL OREGON #SEL0679343 AF341/04 AF570/06 #05752956455 CV6356 + CV8501 #17219380896 MP8910/08 #07456280814 MS798/06 #07792598925 LH7105S/08 LH8290/09 #02099051886 MSC BILBAO #MSCURU409 968 MS1584/10 MS541/10 #07796229840 EVER SAFETY #YMLUM2314 41082 EVER SAFETY #YMLUM2314 41083 ITAL CONTESSA #EGLV142751 545238

2017-03-26

2017-03-27

2017-04-30

2017-05-01

2017-05-10

2017-05-09 40; 41; 42

2017-04-19

2017-04-19

2017-05-01

2017-05-01

2017-05-11

2017-05-04

2017-05-04

2017-05-05

2017-05-05

2017-05-10

2017-05-09 00; 00C ; 10MA ; 20PSB; 40MA ; 4X 2017-05-09 31MB ; 32MB ; 41MB

2017-05-04

2017-05-04

2017-05-05

2017-05-05

2017-05-10

2017-05-09 11UHA

2017-05-07

2017-05-07

2017-05-07

2017-05-08

2017-05-12

2017-05-09 00

2017-05-06

2017-05-06

2017-05-07

2017-05-07

2017-05-12

2017-05-09 41MB

2017-04-12

2017-04-15

2017-05-01

2017-05-01

2017-05-11

2017-05-09 10URA; 30MA ; 40MKA

2017-04-12

2017-04-15

2017-05-01

2017-05-01

2017-05-11

2017-05-10 00; 10LCB; 20MA ; 30MA ; 3X; 40MA ; 4X

2017-04-06

2017-04-07

2017-05-05

2017-05-06

2017-05-15

2017-05-11 41UHA

2017-04-06

2017-04-07

2017-05-05

2017-05-06

2017-05-15

2017-05-11 42UHA

2017-04-11

2017-04-10

2017-05-08

2017-05-06

2017-05-18

2017-05-11 00

2017-04-11

2017-04-10

2017-05-08

2017-05-06

2017-05-18

2017-05-12 41UHA

2017-05-04

2017-05-04

2017-05-06

2017-05-06

2017-05-11

2017-05-12 00URA; 10UBA; 22MK ; 32MKA; 42MBR

2017-05-06

2017-05-06

2017-05-08

2017-05-09

2017-05-13

2017-05-12 00

2017-05-08

2017-05-08

2017-05-08

2017-05-09

2017-05-13

2017-05-12 00; 10; 11; 12; 20; 21; 22; 30; 31; 32; 40; 41; 42

2017-05-06

2017-05-06

2017-05-06

2017-05-06

2017-05-11

2017-05-12 41UBA

2017-05-08

2017-05-08

2017-05-09

2017-05-10

2017-05-14

2017-05-12 00URA

2017-04-05

2017-04-06

2017-04-26

2017-04-26

2017-05-06

2017-05-12 41UHA

2017-05-10

2017-05-10

2017-05-10

2017-05-10

2017-05-15

2017-05-13 31MB ; 32MB

2017-04-02

2017-04-03

2017-05-08

2017-05-08

2017-05-18

2017-05-14 41UHA

2017-04-02

2017-04-03

2017-05-08

2017-05-08

2017-05-18

2017-05-14 11UHA

2017-04-02

2017-04-04

2017-05-08

2017-05-08

2017-05-18

2017-05-14 00


4930 Air

1

133,00

1 Istanbul

CAIRO

3603 Air

1

51,00

0 Br端ssel

CAIRO

5092 Sea

1

5380,00

67 Shanghai

ALEXANDRIA

5037 Sea

6

84282,00

415 Shanghai

ALEXANDRIA

5210 Air

2

5394,00

14 D端sseldorf

CAIRO

5203 Air

7

437,60

3 D端sseldorf

CAIRO

5208 Air

1

3,00

0 Amsterdam

CAIRO

5127 Sea

3

11056,03

5124 Sea

7

83815,16

342 Nhava Sheva

DAMIETTA

5094 Sea

7

103700,00

319 Nhava Sheva

DAMIETTA

5020 Sea 5234 Air

6 6

26480,00 1650,00

29 Ulsan 12 Frankfurt

5229 Air

1

1800,00

4 Frankfurt

5080 Sea

40

355875,38

5074 Sea

2

51120,00

5169 Air

1

295,50

1 Mumbai

CAIRO

5224 Air

2

144,00

1 Prag

CAIRO

5230 Air

1

85,00

0 D端sseldorf

CAIRO

5228 Air

1

101,00

1 Prag

CAIRO

3601 Sea

2

134,60

1 Hamburg

ALEXANDRIA

5225 Air

1

75,00

0 Prag

CAIRO

5237 Air

2

144,00

1 Prag

CAIRO

62 Busan

ALEXANDRIA

ALEXANDRIA CAIRO

CAIRO

984 Busan

ALEXANDRIA

123 Ulsan

ALEXANDRIA

TK092/10 #23564914463 MS726/07 #07796173615 EVER SAFETY #YMLUM2314 41081 EVER SAFETY #YMLUM2314 41086 LH7103/10 LH8290/11 #02099051864 AF341/10 AF570/11 #05752956470 MP8140/11 #07456281175 APL OREGON #SEL0679871 MEHUIN #CAD0294073 MEHUIN #CAD0293263 DA CUI YUN # MS1584/13 MS541/14 #07796229873 MS1584/13 MS541/14 #07796229851 LINAH #SEL0677880 DA CUI YUN #DCY33UKAE0 3 QR8603/12 QR1303/14 #15707649353 EK140/12 EK923/13 #17634608836 MS1520/12 MS541/14 #07796229862 EK140/12 EK923/13 #17634608825 MSC LAUSANNE #MSCURU563 608 EK140/17 EK932/18 #17634608862 EK140/18 EK923/18 #17634608873

2017-05-10

2017-05-10

2017-05-10

2017-05-10

2017-05-15

2017-05-14 22UBA

2017-05-07

2017-05-07

2017-05-07

2017-05-07

2017-05-12

2017-05-14 11UHA

2017-04-02

2017-04-03

2017-05-08

2017-05-08

2017-05-18

2017-05-15 42UHA

2017-04-02

2017-04-03

2017-05-08

2017-05-08

2017-05-18

2017-05-15 41UHA; 42UHA

2017-05-10

2017-05-10

2017-05-11

2017-05-12

2017-05-16

2017-05-15 21C ; 22C

2017-05-10

2017-05-10

2017-05-12

2017-05-12

2017-05-17

2017-05-15 00

2017-05-11

2017-05-11

2017-05-11

2017-05-11

2017-05-16

2017-05-15 11UHA

2017-04-11

2017-04-10

2017-05-08

2017-05-05

2017-05-18

2017-05-16 00

2017-04-24

2017-04-24

2017-05-03

2017-05-03

2017-05-13

2017-05-17 00

2017-04-24

2017-04-24

2017-05-03

2017-05-03

2017-05-13

2017-05-17 00

2017-03-23 2017-05-13

2017-03-31 2017-05-13

2017-05-09 2017-05-14

2017-05-08 2017-05-14

2017-05-19 2017-05-19

2017-05-18 42UHA 2017-05-18 21MB ; 22MB

2017-05-13

2017-05-13

2017-05-14

2017-05-14

2017-05-19

2017-05-18 11C

2017-03-30

2017-03-30

2017-05-08

2017-05-05

2017-05-18

2017-05-18 00

2017-03-27

2017-03-31

2017-05-09

2017-05-08

2017-05-19

2017-05-18 20PAC

2017-05-12

2017-05-12

2017-05-14

2017-05-14

2017-05-19

2017-05-19 00

2017-05-12

2017-05-12

2017-05-13

2017-05-15

2017-05-18

2017-05-19 42MB

2017-05-12

2017-05-12

2017-05-14

2017-05-14

2017-05-19

2017-05-20 00URA

2017-05-12

2017-05-12

2017-05-13

2017-05-14

2017-05-18

2017-05-20 42MB

2017-04-28

2017-04-28

2017-05-14

2017-05-14

2017-05-24

2017-05-21 30BAA

2017-05-17

2017-05-17

2017-05-18

2017-05-18

2017-05-23

2017-05-21 42MB

2017-05-18

2017-05-18

2017-05-19

2017-05-19

2017-05-24

2017-05-21 42MB


5150 Sea

4

17010,00

45 Hamburg

ALEXANDRIA

5097 Sea

6

128564,08

230 Hamburg

ALEXANDRIA

5137 Sea

5

35200,00

221 Antwerpen

ALEXANDRIA

5098 Sea

15

18551,92

5035 Sea

12

21345,00

104 Nhava Sheva

DAMIETTA

5132 Sea

39

22669,00

309 Hamburg

ALEXANDRIA

5088 Sea

1

8848,00

67 Busan

ALEXANDRIA

5143 Sea

8

3098,00

10 Chennai

DAMIETTA

98 Rijeka

ALEXANDRIA

3598 Sea

1

35,65

5151 Sea

20

34762,50

0 Rijeka

ALEXANDRIA

100 Hamburg

ALEXANDRIA

5082 Sea

29

28020,00

64 Busan

5236 Air

1

963,23

1 Genua

5122 Sea

6

89436,70

5142 Sea

1

8636,00

5180 Sea

28

12811,00

5222 Air

12

4148,21

5144 Sea

4

13347,00

5243 Air

2

575,00

5247 Air

6

1650,00

3605 Air

2

100,00

1 Düsseldorf

CAIRO

5238 Air

1

915,00

2 Frankfurt

CAIRO

ALEXANDRIA CAIRO

402 Shanghai

ALEXANDRIA

67 Houston

ALEXANDRIA

34 Hamburg

ALEXANDRIA

10 Düsseldorf

CAIRO

96 Ho Chi Minh

ALEXANDRIA

0 Amsterdam

12 Frankfurt

CAIRO

CAIRO

MSC LAUSANNE #MSCURU549 987 MSC LAUSANNE #MSCURU500 394 GRANDE TOGO #S312891822 AS CYPRIA #RJK0112234 CMA CGM INDUS #AMC0549222

2017-04-28

2017-04-28

2017-05-15

2017-05-14

2017-05-25

2017-05-21 30BFT; 40BFT

2017-04-28

2017-04-28

2017-05-14

2017-05-14

2017-05-24

2017-05-21 30BAT; 40BAT

2017-04-28

2017-05-02

2017-05-11

2017-05-11

2017-05-21

2017-05-22 40PAC

2017-04-26

2017-04-26

2017-05-16

2017-05-15

2017-05-26

2017-05-22 30BAT

2017-05-02

2017-05-02

2017-05-14

2017-05-14

2017-05-24

2017-05-23 20LCB

RIO DE LA PLATA #SGL465538 MSC CAMILLE #MSCUKU762 684 YM UBERTY #YMLUM5150 68695 AS CYPRIA #RJK0112235 RIO DE LA PLATA #SGL475902

2017-05-03

2017-05-03

2017-05-16

2017-05-16

2017-05-26

2017-05-23 30BAA

2017-04-12

2017-04-12

2017-05-15

2017-05-15

2017-05-25

2017-05-23 42UHA

2017-04-26

2017-04-26

2017-05-17

2017-05-17

2017-05-27

2017-05-23 41UHA; 42UHA

2017-04-26

2017-04-26

2017-05-16

2017-05-15

2017-05-26

2017-05-23 30BAT

2017-05-03

2017-05-03

2017-05-16

2017-05-16

2017-05-26

MSC CAMILLE #MSCUKU762 866 LH279/18 LH8290/18 #02095508280 E.R. TIANSHAN #YMLUM2314 45206 LIVERPOOL EXPRESS #HLCUHOU17 0444042 RIO MADEIRA #SGL486856 MS1520/19 MS541/21 #07796229895 YM INTELLIGENT #YMLUM4903 03626 MS1534/20 MS521/21 #07796678772 LH8290/23 #02099051971 AF341/11 AF789/13 #05752956503 LH8290/18 #02099051934

2017-04-12

2017-04-12

2017-05-16

2017-05-15

2017-05-26

2017-05-23 00C ; 20C ; 20PAH; 30BAB; 30LCA; 30MA ; 30PGB; 30UBA; 31UBA; 32UBA; 40BAB; 40LCL; 4X 2017-05-23 40; 41; 42

2017-05-18

2017-05-18

2017-05-18

2017-05-18

2017-05-23

2017-05-23 00URA

2017-04-13

2017-04-14

2017-05-18

2017-05-20

2017-05-28

2017-05-24 41UHA

2017-04-25

2017-04-25

2017-05-20

2017-05-21

2017-05-30

2017-05-25 41UHA

2017-05-10

2017-05-11

2017-05-20

2017-05-21

2017-05-30

2017-05-18

2017-05-18

2017-05-21

2017-05-21

2017-05-26

2017-05-25 1X; 20LCB; 2X; 30BTA; 30LAC; 3X; 4X 2017-05-25 00C ; 00EKH; 10MA ; 11UBA; 21MK ; 32MB

2017-04-18

2017-04-18

2017-05-19

2017-05-20

2017-05-29

2017-05-25 42UHA

2017-05-20

2017-05-20

2017-05-21

2017-05-21

2017-05-26

2017-05-26 11UHA

2017-05-23

2017-05-23

2017-05-24

2017-05-24

2017-05-29

2017-05-26 11MB ; 12MB

2017-05-12

2017-05-12

2017-05-14

2017-05-14

2017-05-19

2017-05-26 00URA

2017-05-18

2017-05-18

2017-05-18

2017-05-18

2017-05-23

2017-05-26 21C


5241 Air

1

39,00

0 Incheon

5131 Sea

7

8877,51

5140 Sea 3608 Air

4 3

69720,00 210,00

284 Antwerpen 1 Düsseldorf

ALEXANDRIA CAIRO

5147 Sea 5086 Sea 2958 Air

1 5 2

9983,00 29396,00 3430,00

41 Antwerpen 150 Antwerpen 20 Frankfurt

ALEXANDRIA ALEXANDRIA CAIRO

5212 Air

4

313,00

1 Düsseldorf

CAIRO

5232 Air

10

1995,20

5 Düsseldorf

CAIRO

5146 Sea

17

20622,20

5133 Sea

15

11933,00

2959 Air

1

180,00

5166 Sea

6

19000,00

5235 Air

7

1295,70

5248 Air

1

2,40

5167 Sea

5

41066,40

5242 Sea

1

120,00

5165 Sea

14

196770,28

5178 Sea

12

5179 Sea

28 Busan

93 Jebel Ali Port 117 Hamburg

1 Düsseldorf

153 Hamburg

CAIRO

ALEXANDRIA

ALEXANDRIA ALEXANDRIA

CAIRO

ALEXANDRIA

5 Düsseldorf

CAIRO

0 Wien

CAIRO

335 Shanghai 0 Düsseldorf

ALEXANDRIA CAIRO

QR8983/21 QR1301/22 #15708309000 XIN TIAN JIN #SEL0681205 CELINE #031 LH7105/20 LH8290/21 #02099051945 CELINE #030 CELINE #029 KL8440/12 MP8910/16 MP8 #07453010635 AF341/15 AF570/18 #05752956492 MS1520/18 MS541/19 #07796229906 AL HILAL #DXB0357181 MSC ADELAIDE #MSCURU500 246 AF361/11 AF570/12 #05752956481 MSC ADELAIDE #MSCURU587 425 MS1520/24 MS541/26 #07796595004 MS798/25 #07792599091 YM UBERTY #YMLUM2314 50649 MS1520/26 MS541/28 #07796595030 YM UBERTY #YMLUM2314 49561 SUEZ CANAL #AMC0550992

2017-05-21

2017-05-21

2017-05-22

2017-05-22

2017-05-27

2017-05-26 00

2017-04-17

2017-04-17

2017-05-22

2017-05-22

2017-06-01

2017-05-28 00

2017-05-05 2017-05-20

2017-05-06 2017-05-19

2017-05-18 2017-05-21

2017-05-18 2017-05-22

2017-05-28 2017-05-26

2017-05-28 10UEN 2017-05-28 00URA

2017-05-05 2017-05-05 2017-05-12

2017-05-06 2017-05-06 2017-05-12

2017-05-18 2017-05-18 2017-05-16

2017-05-18 2017-05-18 2017-05-16

2017-05-28 2017-05-28 2017-05-21

2017-05-28 20PAH 2017-05-28 40MA 2017-05-28 00MA

2017-05-15

2017-05-15

2017-05-18

2017-05-18

2017-05-23

2017-05-28 00URA; 10MA ; 22MBR; 32MKA

2017-05-18

2017-05-18

2017-05-19

2017-05-19

2017-05-24

2017-05-28 00C ; 00URA; 20MA ; 21MK ; 31MKA

2017-04-21

2017-04-27

2017-05-19

2017-05-22

2017-05-29

2017-05-28 42MBR

2017-05-03

2017-05-03

2017-05-22

2017-05-22

2017-06-01

2017-05-29 30BAA

2017-05-11

2017-05-11

2017-05-12

2017-05-12

2017-05-17

2017-05-29 00MB

2017-05-03

2017-05-03

2017-05-22

2017-05-22

2017-06-01

2017-05-30 42UHA

2017-05-24

2017-05-24

2017-05-26

2017-05-28

2017-05-31

2017-05-30 00C ; 00UEN; 42C

2017-05-25

2017-05-25

2017-05-25

2017-05-25

2017-05-30

2017-05-30 11CYE

2017-04-27

2017-04-27

2017-05-24

2017-05-27

2017-06-03

2017-05-31 42UHA

2017-05-26

2017-05-26

2017-05-28

2017-05-28

2017-06-02

2017-05-31 42MB

2017-04-27

2017-04-27

2017-05-24

2017-05-27

2017-06-03

2017-06-01 42UHA

2017-05-15

2017-05-16

2017-05-24

2017-05-28

2017-06-03

2017-06-02 30LCB

937 Shanghai

ALEXANDRIA

21345,00

104 Nhava Sheva

DAMIETTA

12

21345,00

104 Nhava Sheva

DAMIETTA

SUEZ CANAL #AMC0550962

2017-05-15

2017-05-16

2017-05-24

2017-05-28

2017-06-03

2017-06-02 40LCB

5199 Sea

2

26700,00

154 Hamburg

ALEXANDRIA

2017-05-10

2017-05-12

2017-05-27

2017-05-28

2017-06-06

2017-06-04 20MA

5141 Sea

3

36300,00

259 Hamburg

ALEXANDRIA

MSC ADELAIDE #MSCURU693 165 MSC ADELAIDE #MSCURU512 258

2017-05-11

2017-05-12

2017-05-27

2017-05-28

2017-06-06

2017-06-04 10UEN


5183 Sea

2

3758,00

9 Hamburg

ALEXANDRIA

5193 Sea

13

16642,00

64 Hamburg

ALEXANDRIA

5252 Air

1

120,00

0 Frankfurt

CAIRO

5244 Air

1

400,00

1 Chennai

CAIRO

5176 Sea

3

20820,00

42 Ulsan

ALEXANDRIA

5177 Sea

3

20820,00

42 Ulsan

ALEXANDRIA

5162 Sea

8

45726,86

213 Bulsan

ALEXANDRIA

5254 Air

1

8,90

5046 Sea

2

3564,15

5031 Sea

12

187370,28

5256 Air

1

3,80

3607 Air

1

2961 Air

0 Wien

CAIRO

7 Busan

ALEXANDRIA

803 Shanghai

ALEXANDRIA

0 Prag

CAIRO

158,00

1 D端sseldorf

CAIRO

3

74,21

0 D端sseldorf

CAIRO

5198 Sea

12

89915,00

803 Hamburg

ALEXANDRIA

5019 Sea 4986 Sea

24 5

3086000,00 85493,10

6641 Ulsan 339 Shanghai

ALEXANDRIA ABU KIR

5260 Air

1

0,23

5264 Air

1

130,00

5276 Air

2

5266 Air

5249 Air

0 Prag

CAIRO

0 Berlin

CAIRO

66,00

0 Leipzig

CAIRO

3

94,60

0 D端sseldorf

CAIRO

4

24,50

0 D端sseldorf

CAIRO

MSC ADELAIDE #MSCURU673 423 MSC ADELAIDE #MSCURU722 725 AF341/26 AF570/27 #05752956525 EY936/29 EY653/30 #60774687841 MSC PALOMA #960381668 MSC PALOMA #960381618 PUCON #SEL0683567 MS798/02 #07792599216 MSC DANIELA #MSCUKU734 618 MSC LIVORNO #MSCUU9682 958 EK140/31 EK923/01 #17634609035 AF363/01 AF570/03 #05752956536 MS1520/02 MS541/04 #07796595015 MSC SINDY #MSCURU719 481 DA CUI YUN # KBS STAR #KS1701SHAB U001 OS712/01 OS863/02 #02074987360 MS732/02 #07796595041 MS541/08 #07796595096 MS1520/02 MS541/08 #07796595074 MS1520/02 MS541/08 #07796595052

2017-05-11

2017-05-12

2017-05-27

2017-05-28

2017-06-06

2017-06-04 30PGB

2017-05-11

2017-05-12

2017-05-27

2017-05-28

2017-06-06

2017-06-04 1X; 20C ; 2X; 3X; 40MA ; 4X

2017-05-26

2017-05-26

2017-05-30

2017-05-30

2017-06-04

2017-06-04 22MB

2017-05-29

2017-05-29

2017-05-30

2017-05-30

2017-06-04

2017-06-04 11UHA

2017-04-30

2017-04-30

2017-05-31

2017-06-01

2017-06-10

2017-06-05 30LCB

2017-04-30

2017-04-30

2017-05-31

2017-06-01

2017-06-10

2017-06-05 40LCB

2017-04-30

2017-05-03

2017-06-03

2017-05-27

2017-06-13

2017-06-05 00

2017-06-02

2017-06-02

2017-06-02

2017-06-02

2017-06-07

2017-06-06 31BAT

2017-03-19

2017-03-19

2017-06-01

2017-06-01

2017-06-11

2017-06-07 00

2017-03-17

2017-03-17

2017-06-01

2017-06-01

2017-06-11

2017-06-08 32UHA

2017-05-31

2017-05-31

2017-06-01

2017-06-01

2017-06-06

2017-06-08 31BAA

2017-06-01

2017-06-01

2017-06-03

2017-06-03

2017-06-08

2017-06-08 30UBA

2017-06-02

2017-06-02

2017-06-04

2017-06-04

2017-06-09

2017-06-08 00MB

2017-05-17

2017-05-17

2017-06-05

2017-06-04

2017-06-15

2017-06-11 42UHA

2017-03-31 2017-04-08

2017-03-31 2017-04-08

2017-05-08 2017-05-31

2017-05-08 2017-05-31

2017-05-18 2017-06-10

2017-06-12 42UHA 2017-06-12 42UHA

2017-06-01

2017-06-01

2017-06-05

2017-06-04

2017-06-10

2017-06-12 31MB

2017-06-02

2017-06-02

2017-06-02

2017-06-02

2017-06-07

2017-06-12 21MB

2017-06-08

2017-06-08

2017-06-08

2017-06-08

2017-06-13

2017-06-12 00EKH

2017-06-08

2017-06-08

2017-06-08

2017-06-08

2017-06-13

2017-06-12 00EKH

2017-06-08

2017-06-08

2017-06-08

2017-06-08

2017-06-13

2017-06-12 00MA ; 11C ; 42MB


5272 Air

1

10,00

0 Düsseldorf

CAIRO

5271 Air

8

456,00

1 Amsterdam

CAIRO

2962 Air

1

68,00

1 Düsseldorf

CAIRO

5204 Sea

17

22660,00

77 Hamburg

ALEXANDRIA

2957 Sea

2

3430,00

20 Hamburg

ALEXANDRIA

5273 Air

5

23,00

5215 Sea

2

25337,00

5195 Sea

1

8446,00

5153 Sea

1

185000,00

5170 Sea

1

19035,00

5265 Air

1

6,00

0 Düsseldorf

CAIRO

5278 Air

1

57,00

0 Düsseldorf

CAIRO

5269 Air

1

1748,60

3 Wien

CAIRO

5274 Air

1

5,50

0 Hamburg

CAIRO

5267 Air

4

581,36

4 Düsseldorf

CAIRO

5201 Sea

4

367000,00

629 Rotterdam

5280 Air

1

2200,00

5287 Air

1

2963 Air

5283 Air

0 Leipzig

CAIRO

60 Nhava Sheva

ALEXANDRIA

67 Houston

ALEXANDRIA

156 Rotterdam 52 Nhava Sheva

BURULLUS ALEXANDRIA

BURULLUS

7 Frankfurt

CAIRO

46,00

0 Düsseldorf

CAIRO

1

14,00

0 Düsseldorf

CAIRO

1

46,00

0 Wien

CAIRO

MS1520/02 MS541/08 #07796595085 MS758/07 #07796681045 MS1520/01 MS541/02 #07796595063 MSC SINDY #MSCURU760 121 MSC SINDY #MSCURU748 357 MS1584/07 MS541/08 #07796595100 MAIPO #CAD0296960 NORTHERN DECENCY #HLCUHOU17 0519637 MITTELPLATE #MITT-RTMBUR-1 MAIPO #CAD0296070 LH7105S/07 LH8290/08 #02099052063 MS1520/08 MS541/09 #07796595122 MS9537T/08 MS541/11 #07792599312 MS798/09 #07792599323 AF341/09 AF570/11 #05752956551 MITTELPLATE #MITT-ROTBUR-2 CV6953/09 CV8501/12 #17223745901 MS1520/09 MS541/11 #07796595133 MS1520/09 MS541/11 #07796595111 MS798/10 #07792599371

2017-06-08

2017-06-08

2017-06-08

2017-06-08

2017-06-13

2017-06-12 40MA

2017-06-07

2017-06-07

2017-06-07

2017-06-07

2017-06-12

2017-06-12 11UHA; 12UHA; 21UHA; 31UHA; 41UHA; 42UHA

2017-06-02

2017-06-02

2017-06-04

2017-06-04

2017-06-09

2017-06-12 00

2017-05-17

2017-05-17

2017-06-03

2017-06-04

2017-06-13

2017-06-12 1X; 2X; 3X; 40LBF; 40MA ; 4X

2017-05-17

2017-05-17

2017-06-05

2017-06-04

2017-06-15

2017-06-12 00MA

2017-06-07

2017-06-07

2017-06-08

2017-06-08

2017-06-13

2017-06-12 00EKH

2017-05-29

2017-05-29

2017-06-07

2017-06-07

2017-06-17

2017-06-13 00

2017-05-11

2017-05-11

2017-06-11

2017-06-10

2017-06-21

2017-06-14 42UHA

2017-05-26

2017-05-26

2017-06-09

2017-06-08

2017-06-19

2017-06-14 11BAT

2017-05-29

2017-05-29

2017-06-07

2017-06-07

2017-06-17

2017-06-14 00

2017-06-07

2017-06-07

2017-06-08

2017-06-08

2017-06-13

2017-06-14 41MPR

2017-06-08

2017-06-08

2017-06-09

2017-06-08

2017-06-14

2017-06-14 22MK

2017-06-08

2017-06-08

2017-06-11

2017-06-11

2017-06-16

2017-06-14 00

2017-06-09

2017-06-09

2017-06-09

2017-06-09

2017-06-14

2017-06-14 42CYE

2017-06-09

2017-06-09

2017-06-11

2017-06-11

2017-06-16

2017-06-14 00; 00C ; 40MA ; 42MB

2017-05-26

2017-05-26

2017-06-09

2017-06-08

2017-06-19

2017-06-16 40MA

2017-06-09

2017-06-09

2017-06-13

2017-06-13

2017-06-18

2017-06-18 11BAT

2017-06-09

2017-06-09

2017-06-11

2017-06-11

2017-06-16

2017-06-18 21BTA

2017-06-09

2017-06-09

2017-06-11

2017-06-11

2017-06-16

2017-06-18 41MB

2017-06-10

2017-06-10

2017-06-10

2017-06-10

2017-06-15

2017-06-18 00UEN


5175 Sea

13

166896,09

870 Busan

ALEXANDRIA

5282 Air

1

4,00

5275 Air

2

14,67

5182 Sea

5

67680,00

482 Hamburg

ALEXANDRIA

5186 Sea

3

42340,00

289 Hamburg

ALEXANDRIA

5181 Sea

1

11830,00

96 Hamburg

ALEXANDRIA

5284 Air

2

62,50

5217 Sea

1

8420,00

77 Hamburg

ALEXANDRIA

5152 Sea

3

62791,02

115 Hamburg

ALEXANDRIA

5218 Sea

24

41437,50

148 Hamburg

ALEXANDRIA

3602 Sea

6

2525,00

5 Hamburg

ALEXANDRIA

5285 Air

5

842,00

3 Düsseldorf

CAIRO

5259 Air

10

3147,00

8 Düsseldorf

CAIRO

5286 Air

4

77,00

1 Amsterdam

CAIRO

5184 Sea 5223 Sea

5 2

83180,00 20429,00

281 Antwerpen 173 Nhava Sheva

ALEXANDRIA DAMIETTA

5233 Sea

2

26700,00

154 Hamburg

ALEXANDRIA

5231 Sea

32

37177,00

86 Hamburg

ALEXANDRIA

5251 Sea

2

15740,00

154 Hamburg

ALEXANDRIA

5289 Air

4

45,42

5189 Sea

2

818,07

2960 Sea

2

2090,00

0 Incheon

CAIRO

0 Prag

CAIRO

1 Prag

CAIRO

0 Düsseldorf

CAIRO

1 Busan

ALEXANDRIA

13 Hamburg

ALEXANDRIA

APL MINNESOTA #SEL0685634 BA018/11 BA155/12 #12532606582 OS712/09 OS863/12 #02074987500 MSC CHICAGO #MSCURU670 650 MSC CHICAGO #MSCURU670 726 MSC CHICAGO #MSCURU670 684 EK140/09 EK923/10 #17634609083 MSC CHICAGO #MSCURU763 166 MSC CHICAGO #MSCURU619 012 MSC CHICAGO #MSCURU805 652 MSC CHICAGO #MSCURU772 845 MS1520 + MS541 #07796595144 AF341/09 AF570/15 #05752956540 MS758/14 #07796682574 YM FUJI #019 MATAQUITO #AMC0555242

2017-05-08

2017-05-08

2017-06-02

2017-06-12

2017-06-12

2017-06-18 42UHA

2017-06-10

2017-06-10

2017-06-12

2017-06-12

2017-06-17

2017-06-19 32UHA

2017-06-09

2017-06-09

2017-06-12

2017-06-12

2017-06-17

2017-06-19 21MB ; 22MB

2017-05-24

2017-05-24

2017-06-10

2017-06-12

2017-06-20

2017-06-19 30UBA

2017-05-24

2017-05-24

2017-06-10

2017-06-12

2017-06-20

2017-06-19 30UBA; 31UBA; 32UBA

2017-05-24

2017-05-24

2017-06-10

2017-06-12

2017-06-20

2017-06-19 30UBA

2017-06-09

2017-06-09

2017-06-10

2017-06-10

2017-06-15

2017-06-20 41MB ; 42MB

2017-05-24

2017-05-24

2017-06-10

2017-06-12

2017-06-20

2017-06-20 30UBA

2017-05-24

2017-05-24

2017-06-10

2017-06-12

2017-06-20

2017-06-20 11BAT

2017-05-24

2017-05-24

2017-06-10

2017-06-12

2017-06-20

2017-06-20 00; 00C ; 10PAC; 30MA ; 40MA

2017-05-24

2017-05-24

2017-06-10

2017-06-12

2017-06-20

2017-06-20 30BTA; 30MA

2017-06-14

2017-06-14

2017-06-15

2017-06-15

2017-06-20

2017-06-21 00C ; 10C ; 42MB ; 42MPR

2017-06-15

2017-06-15

2017-06-15

2017-06-15

2017-06-20

2017-06-21 00; 10MA ; 42MB

2017-06-14

2017-06-14

2017-06-14

2017-06-14

2017-06-19

2017-06-21 00

2017-05-31 2017-06-05

2017-05-30 2017-06-05

2017-06-13 2017-06-14

2017-06-12 2017-06-15

2017-06-23 2017-06-24

2017-06-21 30LAC; 40MA 2017-06-21 12MBR

MSC CHICAGO #MSCURU806 387 MSC BILBAO #MSCURU862 422 RIO DE LA PLATA #SGL534944 MS1520 + MS541 #07796595155 MSC TARANTO #MSCUKU818 130

2017-05-24

2017-05-24

2017-06-10

2017-06-12

2017-06-20

2017-06-21 10MA

2017-05-31

2017-05-31

2017-06-17

2017-06-18

2017-06-27

2017-06-07

2017-06-09

2017-06-17

2017-06-18

2017-06-27

2017-06-23 00; 00C ; 10C ; 1X; 20C ; 2X; 30C ; 30LCB; 30MA ; 31C ; 32C ; 40C ; 40LCB; 40MA 2017-06-23 11BAT

2017-06-14

2017-06-14

2017-06-15

2017-06-15

2017-06-20

2017-06-23 11MKC; 42MB

2017-05-07

2017-05-07

2017-06-13

2017-06-14

2017-06-23

2017-06-23 00

MSC BILBAO #MSCURU862 588

2017-05-31

2017-05-31

2017-06-17

2017-06-18

2017-06-27

2017-06-29 00MA


5292 Air

4

288,00

1 Budapest

5294 Air

4

6730,00

5291 Air

2

1184,00

1 Genua

CAIRO

5261 Sea

1

1604,00

6 Gemlik

ALEXANDRIA

5246 Sea

3

4600,00

15 Hamburg

ALEXANDRIA

5220 Sea

15

11933,00

124 Hamburg

ALEXANDRIA

5207 Sea

5

1090,00

3 Busan

ALEXANDRIA

5268 Air

1

153,00

2 Lissabon

CAIRO

5295 Air

2

20,00

0 D端sseldorf

CAIRO

5293 Air

3

93,60

0 D端sseldorf

CAIRO

5279 Air

1

199,00

1 Chennai

CAIRO

3606 Sea

2

134,60

1 Hamburg

ALEXANDRIA

5281 Air

1

29,00

0 Shanghai

CAIRO

5214 Sea

3

1224,00

6 Lissabon

ALEXANDRIA

5245 Sea

33

29141,00

96 Hamburg

ALEXANDRIA

5138 Sea

100

106000,00

139 Hamburg

ALEXANDRIA

3611 Air

1

127,00

0 D端sseldorf

CAIRO

5290 Sea

1

671,86

1 Hamburg

ALEXANDRIA

5304 Air

3

70,60

0 D端sseldorf

CAIRO

5308 Air

2

10,45

0 Prag

CAIRO

22 Wien

CAIRO CAIRO

KL8570 + MP8910 #07456587904 LH8290/22 #02099052111 LH247/22 LH8290/22 #02077354303 MSC JENNY #MSCURU912 334 MSC RANIA #MSCURU885 126 MSC RANIA #MSCURU783 628 MSC CLORINDA #MSCUKU835 258 AF685M + AF570 #05749385486 MS15220/22 MS541/21 #07796595170 MS1520/22 MS541/23 #07796595166 EY972/23 EY653/25 #60775259575 MSC RANIA #MSCURU784 527 EK9873/18 EK0927/19 #17654253091 MSC ULSAN #MSCULJ3198 33 MSC RANIA #MSCURU896 974

2017-06-15

2017-06-15

2017-06-22

2017-06-22

2017-06-27

2017-07-04 10MA ; 20MA ; 30MA ; 40MA

2017-06-22

2017-06-22

2017-06-22

2017-06-23

2017-06-27

2017-07-04 11BAT

2017-06-22

2017-06-22

2017-06-22

2017-06-23

2017-06-27

2017-07-04 00URA; 20URA

2017-06-13

2017-06-11

2017-06-21

2017-06-23

2017-07-01

2017-07-04 20SGC

2017-06-07

2017-06-07

2017-06-23

2017-06-26

2017-07-03

2017-07-04 40PAA

2017-06-07

2017-06-07

2017-06-23

2017-06-26

2017-07-03

2017-07-04 40BAA

2017-05-21

2017-05-21

2017-06-22

2017-06-21

2017-07-02

2017-07-04 00

2017-06-14

2017-06-14

2017-06-19

2017-06-19

2017-06-24

2017-07-04 12C

2017-06-22

2017-06-22

2017-06-23

2017-06-25

2017-06-28

2017-07-04 10MA ; 22MPR

2017-06-22

2017-06-22

2017-06-23

2017-06-23

2017-06-28

2017-07-04 00URA; 21MB ; 21MK

2017-06-23

2017-06-23

2017-06-25

2017-06-25

2017-06-30

2017-07-04 11UHA

2017-06-07

2017-06-07

2017-06-23

2017-06-26

2017-07-03

2017-07-05 40BAA

2017-06-18

2017-06-18

2017-06-19

2017-06-19

2017-06-24

2017-07-05 21BBT

2017-06-05

2017-06-05

2017-06-15

2017-06-18

2017-06-25

2017-07-06 00C ; 10C ; 20C

2017-06-07

2017-06-07

2017-06-23

2017-06-26

2017-07-03

MSC RANIA #MSCURU512 514 EY074/30 EY653/01 #60774624631 MONTE ALEGRE #SGL539327 MS1520/22 MS541/23 #07796595181 EK140/23 EK927/25 #17634609131

2017-06-07

2017-06-07

2017-06-23

2017-06-26

2017-07-03

2017-07-06 00; 00EKH; 12UBA; 30C ; 30LDK; 30MA ; 3X; 40C ; 40LDK; 40MA ; 40UBA; 41UBA; 42UBA; 4X 2017-07-06 00

2017-06-30

2017-06-30

2017-06-01

2017-07-01

2017-06-06

2017-07-10 12BAC

2017-06-21

2017-06-21

2017-07-01

2017-07-02

2017-07-11

2017-07-10 00

2017-06-22

2017-06-22

2017-06-23

2017-06-25

2017-06-28

2017-07-10 42MB

2017-06-23

2017-06-23

2017-06-25

2017-06-26

2017-06-30

2017-07-10 32MB ; 42MB


5307 Air

1

181,00

1 Wien

CAIRO

5312 Air

1

529,68

1 Wien

CAIRO

5321 Air

1

0,10

0 Amsterdam

CAIRO

5314 Air

1

1,33

0 Prag

CAIRO

5320 Air

1

2,50

0 Prag

CAIRO

5310 Air

1

40,00

0 Incheon

CAIRO

5309 Air

10

2034,53

6 Düsseldorf

CAIRO

5300 Air

6

1978,80

6 Düsseldorf

CAIRO

5270 Sea

2

16583,26

23 Hamburg

ALEXANDRIA

5219 Sea

309 Hamburg

ALEXANDRIA

39

22669,00

5322 Air

1

127,00

2 Milano

CAIRO

5319 Air

1

445,00

1 Mailand

CAIRO

6103 Air

2

2,70

0 Wien

CAIRO

6105 Air

1

1,90

0 Wien

CAIRO

3612 Air

1

155,00

1 Düsseldorf

CAIRO

6100 Air

1

15,50

0 Leipzig

CAIRO

5311 Air

1

4,00

0 Düsseldorf

CAIRO

5324 Air

4

403,08

3 Düsseldorf

CAIRO

23

10169,00

17 Hamburg

2

41,50

0 Amsterda

3610 Sea

6102 Air

ALEXANDRIA

CAIRO

MS9537T/23 MS541/28 #07796694640 MS9537T/28 MS537/30 #07796694684 MP8140/29 #07458243905 EK140/28 EK927/30 #17663497792 EK140/29 EK927/01 #17651853675 EY873/30 EY653/01 #60775896413 MS1520/30 MS541/02 #07796595214 MS1520/26 MS541/28 #07796595192 RIO MADEIRA #SGL537453 RIO MADEIRA #SGL541613 MS533/08 #07796040000 MS533/08 #07796039996 MS798/06 #07796694846 MS798/07 #07796694765 KL8440/04 MP8140/06 #07453010661 MS1598/04 MS541/05 #07796595240 MS1520/29 MS541/30 #07796595203 MS1520/06 MS541/07 #07796595236 MSC PORTUGAL #MSCURU926 524 MS758/08 #07796685551

2017-06-23

2017-06-23

2017-06-28

2017-06-25

2017-07-03

2017-07-10 10SGY

2017-06-28

2017-06-25

2017-06-30

2017-06-30

2017-07-05

2017-07-10 00

2017-06-29

2017-06-29

2017-06-29

2017-06-29

2017-07-04

2017-07-10 00UEN

2017-06-28

2017-06-28

2017-06-30

2017-06-30

2017-07-05

2017-07-10 31MB

2017-06-29

2017-06-29

2017-07-01

2017-07-01

2017-07-06

2017-07-10 42MB

2017-06-30

2017-06-30

2017-07-01

2017-07-01

2017-07-06

2017-07-10 00

2017-06-30

2017-06-30

2017-07-02

2017-07-02

2017-07-07

2017-07-11 00C ; 12MB ; 21MB ; 22C ; 31MKA; 40URA; 42MB ; 42UBA

2017-06-24

2017-06-26

2017-06-28

2017-06-28

2017-07-03

2017-07-11 00; 00C ; 21MBR; 21XKA; XX

2017-06-16

2017-06-16

2017-06-24

2017-06-25

2017-07-04

2017-07-11 00

2017-06-16

2017-06-16

2017-06-24

2017-06-25

2017-07-04

2017-07-11 40BAA

2017-07-08

2017-07-08

2017-07-08

2017-07-08

2017-07-13

2017-07-11 21MBV

2017-07-08

2017-07-08

2017-07-08

2017-07-08

2017-07-13

2017-07-11 00

2017-07-06

2017-07-06

2017-07-06

2017-07-06

2017-07-11

2017-07-12 99UBA

2017-07-07

2017-07-07

2017-07-07

2017-07-07

2017-07-12

2017-07-12 21CYE

2017-07-04

2017-07-04

2017-07-06

2017-07-06

2017-07-11

2017-07-12 00URA

2017-07-04

2017-07-04

2017-07-05

2017-07-05

2017-07-10

2017-07-12 00EKH

2017-06-29

2017-06-29

2017-06-30

2017-06-30

2017-07-05

2017-07-12 00

2017-07-06

2017-07-06

2017-07-07

2017-07-07

2017-07-12

2017-07-12 00; 00C ; 00EKH; 32UBA

2017-06-15

2017-06-14

2017-07-02

2017-07-02

2017-07-12

2017-07-12 40BTA; 40MA

2017-07-08

2017-07-08

2017-07-08

2017-07-09

2017-07-13

2017-07-12 00


5302 Air

2

470,00

4 Dubai

CAIRO

5227 Sea

4

78983,00

5197 Sea

3

227000,00

5239 Sea

1

16800,00

5262 Sea

116

28536,00

317 Hamburg

ALEXANDRIA

5255 Sea

25

21734,00

68 Hamburg

ALEXANDRIA

6104 Air

2

292,10

2 Düsseldorf

CAIRO

5326 Air

2

72,65

0 Düsseldorf

CAIRO

5323 Air

3

255,00

1 Prag

CAIRO

6109 Air

3

242,00

1 Düsseldorf

CAIRO

6106 Air

5

348,10

2 Düsseldorf

CAIRO

5240 Sea

1

6061,00

69 Laem Chabang ALEXANDRIA

5250 Sea

2

7140,00

85 Antwerpen

ALEXANDRIA

5263 Sea

1

4990,00

15 Nhava Sheva

DAMIETTA

5325 Air

1

3,00

0 Düsseldorf

CAIRO

6101 Air

6

946,20

3 Düsseldorf

CAIRO

5328 Air

1

6360,00

38 Shanghai

CAIRO

5317 Air

1

6000,00

33 Shanghai

CAIRO

6114 Air

1

2,10

5329 Air

1

8180,00

251 Antwerpen

ALEXANDRIA

298 3rd May Shipyard

BURULLUS

32 Antwerpen

0 Wien 25 Shanghai

ALEXANDRIA

CAIRO CAIRO

EK923/06 #17652837610 PALENCIA #026 CONSTANCE #CONS-RIJBUR1 PALENCIA #021 MONTE ALEGRE #SGL538416 MONTE ALEGRE #SGL549235 AF341M/07 AF570/09 #05752956573 MS1250/07 MS541/09 #07796595262 MS1597/10 MS541/12 #07796595251 MS1520/11 MS541/12 #07796595273 MS1520/11 MS541/12 #07796595295 MSC GIANNA #MSCUW7383 711 GRANDE TOGO #S313217798 CMA CGM INDIUS #CAD0299425 OS154/04 LH1243/05 LH82 #02099052166 AF341/11 AF570/13 #05752956562 AZG032/13 AZQ4401/17 #50100775832 AZG032/13 AZQ4401/17 #50100775821 MS798/14 #07796695001 AZG042/17 AZQ4403/19 #50100775843

2017-07-06

2017-07-06

2017-07-06

2017-07-06

2017-07-11

2017-07-12 22MBR

2017-06-19

2017-06-21

2017-07-07

2017-07-06

2017-07-17

2017-07-13 30PAH; 40LAC

2017-07-07

2017-07-07

2017-07-12

2017-07-13

2017-07-22

2017-07-13 40BAT

2017-06-19

2017-06-21

2017-07-07

2017-07-06

2017-07-17

2017-07-13 40MA

2017-06-21

2017-06-21

2017-07-01

2017-07-02

2017-07-11

2017-07-13 00

2017-06-21

2017-06-21

2017-07-01

2017-07-02

2017-07-11

2017-07-14 00C ; 30C ; 40C ; 40PGB

2017-07-07

2017-07-07

2017-07-09

2017-07-09

2017-07-14

2017-07-15 00EKH; 30C

2017-07-07

2017-07-07

2017-07-09

2017-07-09

2017-07-14

2017-07-15 00C ; 12BAT

2017-07-10

2017-07-10

2017-07-12

2017-07-10

2017-07-17

2017-07-15 12MB ; 22MB ; 32MB

2017-07-11

2017-07-11

2017-07-12

2017-07-12

2017-07-17

2017-07-15 00EKH

2017-07-11

2017-07-11

2017-07-12

2017-07-12

2017-07-17

2017-07-15 00EKH; 10MA ; 11C ; 30C ; 42C

2017-06-02

2017-06-03

2017-07-04

2017-07-03

2017-07-14

2017-07-15 11UHA

2017-06-27

2017-06-28

2017-07-07

2017-07-10

2017-07-17

2017-07-16 30QU

2017-06-26

2017-06-26

2017-07-05

2017-07-06

2017-07-15

2017-07-16 00

2017-07-04

2017-07-04

2017-07-07

2017-07-10

2017-07-12

2017-07-16 00

2017-07-11

2017-07-11

2017-07-13

2017-07-13

2017-07-18

2017-07-18 00EKH; 00URA; 21XKA; 22MK ; 40MA ; 99UBA

2017-07-13

2017-07-13

2017-07-17

2017-07-17

2017-07-22

2017-07-18 32UHA

2017-07-13

2017-07-13

2017-07-17

2017-07-17

2017-07-22

2017-07-18 32UHA

2017-07-14

2017-07-14

2017-07-14

2017-07-14

2017-07-19

2017-07-20 99UBA

2017-07-17

2017-07-17

2017-07-19

2017-07-19

2017-07-24

2017-07-20 32UHA


5327 Air

1

8220,00

33 Shanghai

CAIRO

6108 Air

2

4366,00

11 Kelsterbach

CAIRO

6111 Air

1

74,00

1 Prag

CAIRO

6110 Air

1

69,00

0 Amsterdam

CAIRO

6113 Air

1

1,35

0 Düsseldorf

CAIRO

3609 Air

3

258,20

1 Düsseldorf

CAIRO

20

17140,60

68 Hamburg

6107 Air

2

34,00

0 Bangkok

5316 Sea

2

24100,00

5277 Sea

1

6116 Air

5226 Sea

ALEXANDRIA CAIRO

135 Rotterdam

ALEXANDRIA

8895,00

77 Hamburg

ALEXANDRIA

5

1434,00

11 Düsseldorf

CAIRO

6117 Air

1

185,00

5216 Sea

2

51120,00

5288 Sea

3

6150,00

27 Hamburg

ALEXANDRIA

5296 Sea

15

23181,00

59 Hamburg

ALEXANDRIA

0 Amsterdam

123 Busan

CAIRO

ALEXANDRIA

AZG042/17 AZQ4403/19 #50100775854 MS1584/14 MS541/14 #07796595284 EK140/14 EK927/16 #17651853771 MS1534/15 MS521/16 #07796686365 MS1520/14 MS541/16 #07796595306 KL8440/14 MP8910/17 #07453010672 HS PARIS #SGL540440 MS961/19 #07796780434 E.R. YOKOHAMA #MSCUOJ1052 19 MSC ATHENS #MSCURU991 692 MS1520/18 MS541/19 #07796595321 MS1534/19 MS521/20 #07796686800 BASLE EXPRESS #HLCUSEL170 538445 MSC ATHENS #MSCUOJ0033 98 MSC ATHENS #MSCUOJ0725 00

2017-07-17

2017-07-17

2017-07-19

2017-07-19

2017-07-24

2017-07-20 32UHA

2017-07-14

2017-07-14

2017-07-14

2017-07-16

2017-07-19

2017-07-20 00

2017-07-14

2017-07-14

2017-07-16

2017-07-16

2017-07-21

2017-07-20 42BAA

2017-07-15

2017-07-15

2017-07-16

2017-07-16

2017-07-21

2017-07-20 12MBL

2017-07-14

2017-07-14

2017-07-16

2017-07-16

2017-07-21

2017-07-20 42MB

2017-07-14

2017-07-14

2017-07-17

2017-07-17

2017-07-22

2017-07-20 00; 22MK ; 40UBA

2017-06-28

2017-06-29

2017-07-08

2017-07-08

2017-07-18

2017-07-19

2017-07-19

2017-07-19

2017-07-19

2017-07-24

2017-07-20 00URA; 30LAC; 30PAH; 30PDB; 40C ; 40LAC; 40MA 2017-07-22 11UHA

2017-07-03

2017-07-03

2017-07-16

2017-07-18

2017-07-26

2017-07-25 11UHA

2017-06-28

2017-06-29

2017-07-18

2017-07-18

2017-07-28

2017-07-25 40UBA

2017-07-18

2017-07-18

2017-07-19

2017-07-19

2017-07-24

2017-07-25 00; 00EKH; 12MB

2017-07-19

2017-07-19

2017-07-20

2017-07-20

2017-07-25

2017-07-25 12MBR

2017-06-06

2017-06-05

2017-07-18

2017-07-19

2017-07-28

2017-07-26 30PAC

2017-06-28

2017-06-29

2017-07-18

2017-07-18

2017-07-28

2017-07-26 30LAC

2017-06-28

2017-06-29

2017-07-18

2017-07-18

2017-07-28

2017-07-26 30PSB; 40PSB


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

B 1.

Intern Siemens

Correspondence status

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Correspondences from OC to Owner Last updated on :

9‐Aug‐17

Last updated by : Basel Wasif Nermine Jean Sn

Letter No.

Date

Letter Title

Category

Reply Required

Target Date

Action By

Status

Reply letter / letters by EEHC 2015_22‐EEHC_SAG‐OH‐L‐00007

1

2015 ‐22‐OC‐EEHC‐L00001

5/Jul/15

Orascom Construction Industries authorized signatory

Commercial

NO

Closed

2

2015 ‐22‐OC‐EEHC‐L00002

21/Jul/15

Topographic Survey Drawings

CIVIL

NO

Closed

3

2015 ‐22‐OC‐EEHC‐L00003

24/Aug/15

EPC Contract 1st Advance Payment LG

Commercial

NO

Closed

4

2015 ‐22‐OC‐EEHC‐L00004

24/Aug/15

EPC Contract 1st Advance Payment

Commercial

NO

Closed

5

2015 ‐22‐OC‐EEHC‐L00005

31/Aug/15

EPC Contract 2nd Advance Payment LG

Commercial

NO

Closed

6

2015 ‐22‐OC‐EEHC‐L00006

2/Sep/15

EPC Contract 2nd Advance Payment

Commercial

NO

Closed

7

2015_22‐OC‐EEHC‐L‐00007

15/Sep/15

Site Finish Levels

Civil

NO

Closed

8

2015_22‐OC‐EEHC‐L‐00008

22/Sep/15

Temporary Switch Gear Building RE 2015_22‐EEHC_SAG‐OH‐L‐00006 Temporary Construction Power

Commercial

YES

Electrical

NO

Closed

9

2015_22‐OC‐EEHC‐L‐00009

22/Sep/15

ASAP

FWD to PGESCo

 payment by 08/09

Closed

10

2015_22‐OC‐EEHC‐L‐00010

28/Sep/15

RE : 2015_22‐EEHC_SAG‐OH‐L‐00003 GIS Skeleton

Commercial / C

NO

Closed

11

2015_22‐OC‐EEHC‐L‐00011

29/Sep/15

RE : 2015_22‐EEHC_SAG‐OH‐L‐00005 Technical Data for Discharge and Intake Pipes

Commercial / Mechnical

NO

Closed

12

2015_22‐OC‐EEHC‐L‐00012

3/Oct/15

Administration Building design modification

Civil

NO

Closed

13

2015_22‐OC‐EEHC‐L‐00013

7/Oct/15

QC Monthly Report

General

NO

Closed

14

2015_22‐OC‐EEHC‐L‐00014

15/Oct/15

Re 2015_22‐EEHC_SAG‐OH‐L‐00021 Administration Building

Civil

NO

Closed

15

2015_22‐OC‐EEHC‐L‐00015

15/Oct/15

Re 2015_22‐EEHC_SAG‐OH‐L‐00016 GIS Building Skeleton

Civil

NO

Closed

16

2015_22‐OC‐EEHC‐L‐00016

15/Oct/15

Re 2015_22‐EEHC_SAG‐OH‐L‐00019 GIS Piles Boring

General

NO

Closed

17

2015_22‐OC‐EEHC‐L‐00019

22/Oct/15

Daily Report

General

NO

Closed

18

2015_22‐OC‐EEHC‐L‐00018

25/Oct/15

NO

Closed

19

2015_22‐OC‐EEHC‐L‐00017

25/Oct/15

NO

Closed

20

2015_22‐OC‐EEHC‐L‐00020

21

29/Oct/15

Re 2015_22‐EEHC_SAG‐OH‐L‐00024 Re Ultra‐Sonic Test for Civil Piles Re 2015_22‐EEHC_SAG‐OH‐L‐00025 Re Hold of Camp General Works Nomination of Additional Supplier cladding Commercial

YES

3/Nov/15 Owner

Closed

2015_22‐OC‐EEHC‐L‐00021

29/Oct/15

Over Head Lines

General

YES

3/Nov/15 Owner

Closed

22

2015_22‐OC‐EEHC‐L‐00022

1/Nov/15

Daily Report

General

NO

Closed

23

2015_22‐OC‐EEHC‐L‐00023

4/Nov/15

RE 2015_22‐EEHC_SAG‐OH‐L‐00032 MV Cables Routes

General

NO

Closed

24

2015_22‐OC‐EEHC‐L‐00024

5/Nov/15

QC Monthly Report

General

NO

Closed

25

2015_22‐OC‐EEHC‐L‐00025

5/Nov/15

NO

Closed

26

2015_22‐OC‐EEHC‐L‐00026

6/Nov/15

NO

Closed

RE 2015_22‐EEHC_SAG‐OH‐L‐00030 Nomination of Commercial additional cladding supplier RE 2015_22‐EEHC_SAG‐OH‐L‐00031 Civil Work problems on Civil Site

Comments

2015_22‐EEHC_SAG‐OH‐L‐00021

    


27

2015_22‐OC‐EEHC‐L‐00028

8/Nov/15

Daily Report

General

NO

Closed

28

2015_22‐OC‐EEHC‐L‐00027

10/Nov/15

Color of Cladding, Flashing, Doors & Windows.

Civil

NO

Closed

29

2015_22‐OC‐EEHC‐L‐00029

11/Nov/15

RE 2015_22‐EEHC_SAG‐OH‐L‐00032 MV Cables Routes

Civil

NO

Closed

30

2015_22‐OC‐EEHC‐L‐00030

12/Nov/15

Nomination of Additional Supplier‐Steel Structure

Civil

YES

31

2015_22‐OC‐EEHC‐L‐00031

12/Nov/15

Nomination of additional Steel reinforcement supplier

Civil

NO

Closed

32

2015_22‐OC‐EEHC‐L‐00032

12/Nov/15

Re 2015_22‐EEHC_SAG‐OH‐L‐00033 GIS Building Drawings

Civil

NO

Closed

33

2015_22‐OC‐EEHC‐L‐00033

12/Nov/15

Civil

NO

Closed

34

2015_22‐OC‐EEHC‐L‐00034

12/Nov/15

Civil

NO

Closed

35

2015_22‐OC‐EEHC‐L‐00035

14/Nov/15

Daily Report

General

NO

Closed

36

2015_22‐OC‐EEHC‐L‐00036

21/Nov/15

Daily Report

General

NO

Closed

37

2015_22‐OC‐EEHC‐L‐00037

29/Nov/15

Daily Report

General

NO

Closed

38

2015_22‐OC‐EEHC‐L‐00038

2/Dec/15

Nomination of additional Cables supplier

Commercial

Yes

39

2015_22‐OC‐EEHC‐L‐00039

2/Nov/15

Re: 2015_22‐EEHC_SAG‐OC‐L‐00040 Temporary RO

Civil

NO

40

2015_22‐OC‐EEHC‐L‐00040

3/Dec/15

Contractor RO plant‐ rejected water line

General

Yes

41

2015_22‐OC‐EEHC‐L‐00041

2/Dec/15

Invoice no. 2 (Site Preparation)

Commercial

NO

42

2015_22‐OC‐EEHC‐L‐00042

3/Dec/15

Nomination of additional Cables suppliers

Commercial

Yes

8/Dec/15 Owner

Closed

2015_22‐EEHC_SAG‐OC‐L‐00043

43

2015_22‐OC‐EEHC‐L‐00043

3/Dec/15

Nomination of additional Cable trays supplier

Commercial

Yes

8/Dec/15 Owner

Closed

2015_22‐EEHC_SAG‐OC‐L‐00044

44

2015_22‐OC‐EEHC‐L‐00044

7/Dec/15

Daily Report

General

NO

Closed

45

2015_22‐OC‐EEHC‐L‐00045

7/Dec/15

November QC Report

General

NO

Closed

46

2015_22‐OC‐EEHC‐L‐00046

10/Dec/15

Administration and Warehouse Buildings

Civil

Yes

15/Dec/15 Owner

Closed

Civil

Yes

15/Dec/15 Owner

Closed

Civil

NO

Re 2015_22‐EEHC_SAG‐OH‐L‐00027 Intake and discharge pipe lines Re 2015_22‐EEHC_SAG‐OH‐L‐00034 Intake and discharge pipe lines

Re 2015_22‐EEHC_SAG‐OC‐L‐00044 Nomination of additional Cable Trays supplier Re: 2015_22‐EEHC_SAG‐OC‐L‐00035 & 00046 Broken dewels

17/Nov/15 Owner

7/Dec/15 Owner

10/Dec/15 Owner

Closed

 

Closed

2015_22‐EEHC_SAG‐OC‐L‐00043

Closed

2015_22‐EEHC_SAG‐OC‐L‐00051

Closed

2015_22‐EEHC_SAG‐OC‐L‐00048

Closed

47

2015_22‐OC‐EEHC‐L‐00047

10/Dec/15

48

2015_22‐OC‐EEHC‐L‐00049

10/Dec/15

49

2015_22‐OC‐EEHC‐L‐00051

13/Dec/15

Nomination of additional Cables supplier

Commercial

Yes

50

2015_22‐OC‐EEHC‐L‐00053

13/Dec/15

Daily Report

General

NO

Closed

51

2015_22‐OC‐EEHC‐L‐00052

14/Dec/15

Owner Caravan Furniture

Commercial

NO

Closed

52

2015_22‐OC‐EEHC‐L‐00054

17/Dec/15

Dispersal model and Ecological study

General

NO

Closed

53

2015_22‐OC‐EEHC‐L‐00056

17/Dec/15

Rejected Water line Approval

General

NO

Closed

54

2015_22‐OC‐EEHC‐L‐00050

17/Dec/15

Re 2015_22‐EEHC_SAG‐OC‐L‐00051 Temporary R.O Plant

civil

NO

Closed

 2015_22‐EEHC_SAG‐OC‐L‐00053

Closed 18/Dec/15 Owner

Closed

2015_22‐EEHC_SAG‐OC‐L‐00053


55

2015_22‐OC‐EEHC‐L‐00055

20/Dec/15

Daily Report from 12 to 18 December 2015.

General

NO

Closed

56

2015_22‐OC‐EEHC‐L‐00057

21/Dec/15

Intake, Discharge and Cooling water lines

Mechanical

NO

Closed

57

2015_22‐OC‐EEHC‐L‐00058

24/Dec/15

Re 2015‐22‐EEHC_SAG‐OC‐L‐00057 Recommended Spare Parts List for BoP

Mechanical

NO

Closed

58

2015_22‐OC‐EEHC‐L‐00048

27/Dec/15

Invoice no. 3 (Site Preparation)

Commercial

NO

Closed

59

2015_22‐OC‐EEHC‐L‐00059

27/Dec/15

Daily Report

General

NO

Closed

60

2015_22‐OC‐EEHC‐L‐00060

27/Dec/15

Nomination of Additional LV Cables Supplier

Commercial

YEs

61

2015_22‐OC‐EEHC‐L‐00061

31/Dec/15

Civil

NO

Closed

62

2015_22‐OC‐EEHC‐L‐00062

31/Dec/15

Closed

2015_22‐EEHC_SAG‐OC‐L‐00067

63

2015_22‐OC‐EEHC‐L‐00063

1/Jan/16

64

2015_22‐OC‐EEHC‐L‐00064

1/Jan/16

65

2015_22‐OC‐EEHC‐L‐00065

4/Jan/16

66

2015_22‐OC‐EEHC‐L‐00066

5/Jan/16

67

2015_22‐OC‐EEHC‐L‐00069

6/Jan/16

68

2015_22‐OC‐EEHC‐L‐00067

10/Jan/16

69

2015_22‐OC‐EEHC‐L‐00068

10/Jan/16

70

2015_22‐OC‐EEHC‐L‐00070

10/Jan/16

71

2015_22‐OC‐EEHC‐L‐00071

10/Jan/16

72

2015_22‐OC‐EEHC‐L‐00072

11/Jan/16

73

2015_22‐OC‐EEHC‐L‐00073

10/Jan/16

74

2015_22‐OC‐EEHC‐L‐00074

10/Jan/16

75

2015_22‐OC‐EEHC‐L‐00075

16/Jan/16

76

2015_22‐OC‐EEHC‐L‐00076

77

7/Jan/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00060

2015_22‐EEHC_SAG‐OC‐L‐00065

Re 2015‐22‐EEHC_SAG‐OC‐L‐00053 Temporary and Permanent Fences Re 2015‐22‐EEHC_SAG‐OC‐L‐00061 , 00063 & 00064 Backfilling of Gas Reducing Station Nomination of Underground Fire Fighting Accessories Suppliers Nomination of HDPE Underground Fire Pipes FM200 Suppliers Re 2015‐22‐EEHC_SAG‐OC‐L‐00067 Backfilling of Gas Reducing Station

Civil

NO

Commercial

YEs

5/Jan/16 Owner

Closed

2015_22‐EEHC_SAG‐OC‐L‐00066

Commercial

YEs

5/Jan/16 Owner

Closed

2015_22‐EEHC_SAG‐OC‐L‐00066

Civil

NO

Closed

Daily Report

General

NO

Closed

NO

Closed

NO

Closed

NO

Closed

Re 2015‐22‐EEHC_SAG‐OC‐L‐00068 Works Required for Gas General Reducing Station Re 2015‐22‐EEHC_SAG‐OC‐L‐00070 Pile Tests for Central Civil Control Building December 2015‐QC Report

General

Re 2015‐22‐EEHC_SAG‐OC‐L‐00066 Nomination of Commercial Underground Fire Fighting Re 2015‐22‐EEHC_SAG‐OC‐L‐00069 Re Meeting about Gas Civil Reducing Station Daily report

General

YEs

15/Jan/16 Owner

Closed

NO

Closed

NO

Closed

Re Re 2015‐22‐EEHC_SAG‐OC‐L‐00043 Nomination of Commercial additional Cables supplier Re 2015‐22‐EEHC_SAG‐OC‐L‐00072 Re Nomination of Commercial Underground Fire Fighting Re 2015‐22‐EEHC_SAG‐OC‐L‐00075 Re Water Table Level of Civil the Gas Reducing Station

YEs

17/Jan/16 Owner

Closed

YEs

17/Jan/16 Owner

Closed

NO

Closed

17/Jan/16

Project's Cermainc tiles types and codes

Civil

NO

Closed

2015_22‐OC‐EEHC‐L‐00077

17/Jan/16

Nomination of GIS HVAC Suppliers

Commercial

YEs

78

2015_22‐OC‐EEHC‐L‐00079

21/Jan/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00074 & 00077 Pile Coordinates for Gas Reducing Station

Civil

NO

Closed

79

2015_22‐OC‐EEHC‐L‐00080

21/Jan/16

International Costal Road infront of Site

General

NO

Closed

80

2015_22‐OC‐EEHC‐L‐00087

21/Jan/16

Invoice no. 4 (Site Preparation)

Commercial

NO

Closed

81

2015_22‐OC‐EEHC‐L‐00081

24/Jan/16

Proposal of Fire Fighting Station building

Civil

NO

Closed

82

2015_22‐OC‐EEHC‐L‐00078

25/Jan/16

Daily report

Civil

NO

Closed

23/Jan/16 Owner

 

2015_22‐EEHC_SAG‐OC‐L‐00069

2015_22‐EEHC_SAG‐OC‐L‐00072

Closed 2015_22‐EEHC_SAG‐OC‐L‐00081

2015_22‐EEHC_SAG‐OC‐L‐00085


83

2015_22‐OC‐EEHC‐L‐00082

31/Jan/16

Daily report

Civil

NO

Closed

84

2015_22‐OC‐EEHC‐L‐00084

2/Feb/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00086 Additional Supplier Nomination for GIS HVAC

Civil

NO

Closed

85

2015_22‐OC‐EEHC‐L‐00085

6/Feb/16

January 2016 ‐QC Report.

General

NO

Closed

86

2015_22‐OC‐EEHC‐L‐00086

7/Feb/16

Daily Reports from 30 January to 05 February 2016.

General

NO

Closed

87

2015_22‐OC‐EEHC‐L‐00088

11/Feb/16

Nomination of additional I&C Cables Supplier.

Commercial

YES

16/Feb/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00099

88

2015_22‐OC‐EEHC‐L‐00089

11/Feb/16

Nomination of additional Low voltage Cables Supplier.

Commercial

YES

16/Feb/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00098

89

2015_22‐OC‐EEHC‐L‐00090

11/Feb/16

Civil

NO

Closed

90

2015_22‐OC‐EEHC‐L‐00091

11/Feb/16

Civil

NO

Closed

91

2015_22‐OC‐EEHC‐L‐00092

16/Feb/16

General

NO

Closed

92

2015_22‐OC‐EEHC‐L‐00095

18/Feb/16

General

YES

93

2015_22‐OC‐EEHC‐L‐00094

21/Feb/16

Commercial

NO

Closed

94

2015_22‐OC‐EEHC‐L‐00096

22/Feb/16

Daily Reports from 13 to 19 February 2016.

General

NO

Closed

95

2015_22‐OC‐EEHC‐L‐00083

22/Feb/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00096 ‐Re Raised Flooring Specimen.

Civil

NO

Closed

2015_22‐EEHC_SAG‐OC‐L‐00105

96

2015_22‐OC‐EEHC‐L‐00098

25/Feb/16

Nomination of Additional Fire‐fighting Pipes Suppliers.

Commercial

YES

Closed

2015_22‐EEHC_SAG‐OC‐L‐00111

97

2015_22‐OC‐EEHC‐L‐00099

25/Feb/16

Civil

NO

Closed

2015_22‐EEHC_SAG‐OC‐L‐00112

98

2015_22‐OC‐EEHC‐L‐00097

25/Feb/16

Commercial

NO

Closed

2015_22‐EEHC_SAG‐OC‐L‐00116

99

2015_22‐OC‐EEHC‐L‐00100

29/Feb/16

Power Supply of Water Treatment.

Electrical

NO

Closed

2015_22‐EEHC_SAG‐OC‐L‐00115

100 2015_22‐OC‐EEHC‐L‐00101

29/Feb/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00099 ‐Re Nomination of Additional ICC Cables Supplier.

Commercial

YES

Closed

2015_22‐EEHC_SAG‐OC‐L‐00110

101 2015_22‐OC‐EEHC‐L‐00102

29/Feb/16

Daily Reports from 20 to 26 February 2016.

General

NO

102 2015_22‐OC‐EEHC‐L‐00104

1/Mar/16

Commercial

YES

103 2015_22‐OC‐EEHC‐L‐00093

1/Mar/16

Civil

104 2015_22‐OC‐EEHC‐L‐00105

6/Mar/16

105 2015_22‐OC‐EEHC‐L‐00107

8/Mar/16

106 2015_22‐OC‐EEHC‐L‐00108

8/Mar/16

107 2015_22‐OC‐EEHC‐L‐00109

13/Mar/16

108 2015_22‐OC‐EEHC‐L‐00103

Re 2015_22‐EEHC_SAG‐OC‐L‐00087 ‐ Re Raised Flooring Specimen. Re 2015_22‐EEHC_SAG‐OC‐L‐00085 ‐Re Proposal for Fire Fighting Station Building. Daily Reports from 06 to 12 February 2016. Re 2015_22‐EEHC_SAG‐OC‐L‐00092 ‐Re Coordinates of Laydown Area. OC Scope share advance payment letters of Guarantee Extension .

Re 2015_22‐EEHC_SAG‐OC‐L‐00100 ‐Re Piping Route of Temporary R.O. Re 2015_22‐EEHC_SAG‐OC‐L‐00104 ‐Re Provision of IT Facilities.

21/Feb/16

1/Mar/16

4/Mar/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00097

2015_22‐EEHC_SAG‐OC‐L‐00102

Closed Closed

2015_22‐EEHC_SAG‐OC‐L‐00113 2015_22‐EEHC_SAG‐OC‐L‐00120

YES

Closed

2015_22‐EEHC_SAG‐OC‐L‐00119

General

NO

Closed

Mechanical

NO

Closed

Civil

NO

Closed

Daily Reports from 05 to 11 March 2016.

General

NO

Closed

13/Mar/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00110 ‐ Re Nomination of additional I&C Cables Supplier.

Commercial

YES

109 2015_22‐OC‐EEHC‐L‐00110

13/Mar/16

2015_22‐EEHC_SAG‐L‐00045 ‐ Demin Water System.

Mechanical

NO

Closed

110 2015_22‐OC‐EEHC‐L‐00111

15/Mar/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00089 ‐ Re Approval of Egyptian Shore Protection Authority.

General

NO

Closed

Nomination of Additional Standard Carbon Steel and St. Steel Pipes Suppliers. Re 2015_22‐EEHC_SAG‐OC‐L‐00107 ‐Re Site Protection Measures against Seawater Inundation. Daily Reports from 27 February to 04 March 2016. Re 2015_22‐EEHC_SAG‐T‐00022 ‐ Service Cooling Water Pumps. Re 2015_22‐EEHC_SAG‐OC‐L‐00047 ‐Re Tests on Working Piles for GIS Building.

6/Mar/16

18/Mar/16

Closed 2015_22‐EEHC_SAG‐OC‐L‐00125


Re 2015_22‐EEHC_SAG‐OC‐L‐00118 & 00088 ‐ Re Western General Construction Road Nomination of additional Fire‐Fighting System Supplier ‐ Commercial ETEA SICUREZZA S.r.l.” – Italy. Re 2015_22‐EEHC_SAG‐OC‐L‐00117 ‐ Re Border Guards' General Approval Re 2015_22‐EEHC_SAG‐OC‐L‐00112 ‐Re Coordinates and General Depth of Temporary R.O. Pipes Re 2015_22‐EEHC_SAG‐OC‐L‐00113 ‐Re Nomination of Commercial Additional Standard Carbon steel and St. Steel Pipes Nomination of additional HDPE underground Pipes Supplier ‐ Commercial Agru” – Germany

NO

111 2015_22‐OC‐EEHC‐L‐00112

15/Mar/16

112 2015_22‐OC‐EEHC‐L‐00113

15/Mar/16

113 2015_22‐OC‐EEHC‐L‐00114

15/Mar/16

114 2015_22‐OC‐EEHC‐L‐00106

15/Mar/16

115 2015_22‐OC‐EEHC‐L‐00115

16/Mar/16

116 2015_22‐OC‐EEHC‐L‐00116

17/Mar/16

117 2015_22‐OC‐EEHC‐L‐00117

24/Mar/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00125 ‐Demin Water System. Mechanical

NO

118 2015_22‐OC‐EEHC‐L‐00119

29/Mar/16

Nomination of additional HDPE underground Pipes ‐ 1. “Plastek” – Italy

Commercial

YES

119 2015_22‐OC‐EEHC‐L‐00120

29/Mar/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00120 ‐Re Nomination of additional Standard Carbon steel and St. steel suppliers.

Commercial

120 2015_22‐OC‐EEHC‐L‐00121

29/Mar/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00124 ‐Re Nomination of additional Fire‐Fighting System Supplier.

121 2015_22‐OC‐EEHC‐L‐00118

30/Mar/16

Daily Reports from 12 to 25 March 2016.

122 2015_22‐OC‐EEHC‐L‐00122

30/Mar/16

123 2015_22‐OC‐EEHC‐L‐00123

30/Mar/16

124 2015_22‐OC‐EEHC‐L‐00124

2/Apr/16

125 2015_22‐OC‐EEHC‐L‐00125

2/Apr/16

126 2015_22‐OC‐EEHC‐L‐00126

2/Apr/16

127 2015_22‐OC‐EEHC‐L‐00127

5/Apr/16

128 2015_22‐OC‐EEHC‐L‐00128

5/Apr/16

129 2015_22‐OC‐EEHC‐L‐00129

7/Apr/16

130 2015_22‐OC‐EEHC‐L‐00130

12/Apr/16

131 2015_22‐OC‐EEHC‐L‐00132

13/Apr/16

132 2015_22‐OC‐EEHC‐L‐00133

14/Apr/16

133 2015_22‐OC‐EEHC‐L‐00131

14/Apr/16

134 2015_22‐OC‐EEHC‐L‐00134

14/Apr/16

135 2015_22‐OC‐EEHC‐L‐00135

14/Apr/16

Re Gas Reducing Station Works Handover.

136 2015_22‐OC‐EEHC‐L‐00137

18/Apr/16

YES

Closed 20/Mar/16

Closed

NO

Closed

NO

Closed

2015_22‐EEHC_SAG‐OC‐L‐00124

Yes

18/Mar/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00120

Yes

22/Mar/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00126

Closed

2015_22‐EEHC_SAG‐OC‐L‐00127

3/Apr/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00133

YES

3/Apr/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00135

Commercial

YES

3/Apr/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00132

General

NO

Commercial

YES

4/Apr/16

Closed

Commercial

YES

4/Apr/16

Closed

Commercial

NO

Closed

Commercial

NO

Closed

Commercial

YES

Closed

Commercial

YES

Commercial

YES

Commercial

YES

General

NO

Commercial

YES

Commercial

NO

Commercial

Yes

Electrical

NO

Closed

Commercial

NO

Closed

Nomination of Additional Steel Structure Supplier ‐ Swegypt Commercial Mina.

Yes

Nomination of additional HDPE underground Pipes ‐ 1. “Eurotubi. Srl” – Italy; Nomination of additional LV Cables Supplier ‐ Helukabel” – Germany. Re 2015_22‐EEHC_SAG‐OC‐L‐00128 ‐Re Termination of Works in Gas Reducing Station. Re 2015_22‐EEHC_SAG‐OC‐L‐00130 ‐Re Decennial Liability Insurance Certificate Re 2015_22‐EEHC_SAG‐OC‐L‐00123 ‐Re Unapproved Suppliers. Re Nomination of additional HDPE underground Pipes suppliers. Re 2015_22‐EEHC_SAG‐OC‐L‐00121 & 105 ‐Re Raised Flooring Guarantee. Re 2015_22‐EEHC_SAG‐OC‐L‐00060 ‐ RE Cooling Water Pipelines ‐ Nomination of additional Underground HDPE Pipes suppliers. Daily Reports from 26 March to 8 April 2016. Re 2015_22‐EEHC_SAG‐OC‐L‐00135 ‐ RE Nomination of Additional Standard Carbon Steel and St. Steel suppliers. Re 2015_22‐EEHC_SAG‐OC‐L‐00139 ‐Re Unapproved Suppliers. Nomination of Additional Steel Plates Supplier ‐ 1. “NLMK VERONA S.p.A.” – Italy. Re 2015_22‐EEHC_SAG‐OC‐L‐00115 ‐Re Power Supply of Water Treatment.

Closed

10/Apr/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00134

2015_22‐EEHC_SAG‐OC‐L‐00138

OPEN 12/Apr/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00140

Closed 17/Apr/16

19/Apr/16

23/Apr/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00141

Closed

2015_22‐EEHC_SAG‐OC‐L‐00149

Closed

2015_22‐EEHC_SAG‐OC‐L‐00144

OPEN


137 2015_22‐OC‐EEHC‐L‐00138

19/Apr/16

Daily Reports from 08 April to 15 April 2016.

138 2015_22‐OC‐EEHC‐L‐00139

19/Apr/16

139 2015_22‐OC‐EEHC‐L‐00140

20/Apr/16

140 2015_22‐OC‐EEHC‐L‐00136

22/Apr/16

141 2015_22‐OC‐EEHC‐L‐00141

23/Apr/16

142 2015_22‐OC‐EEHC‐L‐00142

22/Apr/16

143 2015_22‐OC‐EEHC‐L‐00143

26/Apr/16

144 2015_22‐OC‐EEHC‐L‐00144

27/Apr/16

145 2015_22‐OC‐EEHC‐L‐00145

28/Apr/16

146 2015_22‐OC‐EEHC‐L‐00146

3/May/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00146 ‐Re Nomination of Additional Standard Carbon Steel & St. Steel Suppliers.

147 2015_22‐OC‐EEHC‐L‐00147

3/May/16

148 2015_22‐OC‐EEHC‐L‐00148

General

Nomination of additional Carbon steel and Stainless Steel Commercial Pipes, Valve and Fittings Supplier ‐ CUNADO GROUP” – Nomination of Additional Carbon Steel and Stainless Steel Commercial Pipes and Fittings Supplier ‐ “Kimetal” – Italy. Re 2015_22‐EEHC_SAG‐OC‐L‐00116 ‐IT Facilities to Owner. Commercial Nomination of additional steel pipes and valves Supplier ‐ 1. Commercial “ARCELOR.Mittal” – Italy; Nomination of Additional Electromechanical Installation Commercial Subcontractors ‐ 1. “IREM S.P.A” – Italy. Daily Reports from 16 April to 22 April 2016.

General

Re 2015_22‐EEHC_SAG‐OC‐L‐00143 ‐Re Obstruction of Civil Construction Power Completion. Nomination of additional RCCP pipes Supplier ‐ 1. “( Commercial ECPC)” – Egypt;

NO

Closed

Yes

24/Apr/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00146

Yes

25/Apr/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00146

NO

Closed

Yes

28/Apr/16

Closed

Yes

27/Apr/16

Closed

NO

Closed

NO

Closed

2015_22‐EEHC_SAG‐OC‐L‐00148

Yes

2/May/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00151

Commercial

Yes

8/May/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00153

Re 2015_22‐EEHC_SAG‐OC‐L‐00144 ‐Re Nomination of additional Steel Structure Supplier.

Commercial

Yes

8/May/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00154

3/May/16

Orascom Construction Scope ‐ Invoice No.1.

Commercial

NO

Closed

149 2015_22‐OC‐EEHC‐L‐00149

3/May/16

Site Preparation Agreement ‐ Invoice No.5.

Commercial

NO

Closed

150 2015_22‐OC‐EEHC‐L‐00151

4/May/16

Owner’s RO ‐ Pipeline for reject water.

Civil

Yes

151 2015_22‐OC‐EEHC‐L‐00152

9/May/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00127 ‐Re Demin Water System.

Mechanical

NO

Closed

152 2015_22‐OC‐EEHC‐L‐00153

5/May/16

Daily Reports from 23 April to 29 April 2016.

General

NO

Closed

153 2015_22‐OC‐EEHC‐L‐00154

9/May/16

Gas Pipeline ‐ As‐built drawings.

Civil

Yes

154 2015_22‐OC‐EEHC‐L‐00155

10/May/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00147 ‐Re Discrepancy of Piles Between Units

Civil

NO

155 2015_22‐OC‐EEHC‐L‐00150

10/May/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00141 ‐RE Nomination of additional standard Carbon Steel and St. Steel Supplier.

Commercial

Yes

14/May/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00156

156 2015_22‐OC‐EEHC‐L‐00156

11/May/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00153 ‐ Re Nomination of Additional standard Carbon Steel and St. Steel Supplier.

Commercial

Yes

16/May/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00157

157 2015_22‐OC‐EEHC‐L‐00157

12/May/16

Commercial

Yes

16/May/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00158

158 2015_22‐OC‐EEHC‐L‐00158

12/May/16

Mechanical

NO

Closed

159 2015_22‐OC‐EEHC‐L‐00159

12/May/16

NO

Closed

160 2015_22‐OC‐EEHC‐L‐00160

17/May/16

161 2015_22‐OC‐EEHC‐L‐00161

18/May/16

Nomination of Additional Sump Pumps Suppliers ‐ 1. “FAGGIOLATI” – Italy. Re 2015_22‐EEHC_SAG‐OC‐L‐00140 ‐ Re Cooling Water Pipelines‐Nomination of Additional HDPE. Daily Reports from 30 April to 06 May 2016.

Nomination of additional Air Conditioning Supplier ‐ Weger Commercial Walter Gmbh” – Italy. Intake Heads Boreholes. Civil

7/May/16

13/May/16

Closed

Closed Closed

YES

22/May/16

Closed

YES

20/May/16

Closed


162 2015_22‐OC‐EEHC‐L‐00162

18/May/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00157 ‐RE Nomination of additional carbon steel and st. steel pipes, valves and fittings supplier 3.

Commercial

YES

163 2015_22‐OC‐EEHC‐L‐00163

19/May/16

Site Preparation Agreement ‐ Invoice No.6.

Commercial

NO

Closed

164 2015_22‐OC‐EEHC‐L‐00164

19/May/16

Daily Reports from 07 May to 13 May 2016.

General

NO

Closed

165 2015_22‐OC‐EEHC‐L‐00165

21/May/16

Nomination of Additional Piping Suppliers.

Commercial

YES

26/May/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00165

166 2015_22‐OC‐EEHC‐L‐00166

23/May/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00161 ‐RE Nomination of Additional Carbon Steel and St.Steel Pipes, Valves & Fiitings Commercial Supplier 4.

YES

28/May/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00166

167 2015_22‐OC‐EEHC‐L‐00167

23/May/16

Notice for factory Inspection Test.

Commercial

YES

Closed

2015_22‐EEHC_SAG‐OC‐L‐00164

168 2015_22‐OC‐EEHC‐L‐00169

24/May/16

Commercial

YES

29/May/16

Closed

169 2015_22‐OC‐EEHC‐L‐00170

24/May/16

Commercial

YES

29/May/16

Closed

170 2015_22‐OC‐EEHC‐L‐00168

25/May/16

General

YES

28/May/16

Closed

171 2015_22‐OC‐EEHC‐L‐00171

26/May/16

Commercial

YES

Closed

172 2015_22‐OC‐EEHC‐L‐00172

26/May/16

Commercial

YES

Closed

Arabic Letter Dated 5 Jun, 2016

173 2015_22‐OC‐EEHC‐L‐00173

26/May/16

Commercial

YES

31/May/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00170

174 2015_22‐OC‐EEHC‐L‐00174

27/May/16

YES

30/May/16

Closed

175 2015_22‐OC‐EEHC‐L‐00175

29/May/16

YES

4/Jun/16

Closed

176 2015_22‐OC‐EEHC‐L‐00176

30/May/16

177 2015_22‐OC‐EEHC‐L‐00177

1/Jun/16

178 2015_22‐OC‐EEHC‐L‐00178

Nomination of Additional Air Conditioning Component' Supplier "Saiver ‐ Italy" Re 2015_22‐EEHC_SAG‐OC‐L‐00153 ‐Re Nomination of Additional Carbon Steel and St. Steel Pipes, Valves & Fittings Supplier. Contractor's Taken Material on Site The Reduction of the Advance Payment Letters of Guarantee. Site Preparation Agreement Advance Payment letters of Guarantee return. Nomination of Additional Piping Supplier ‐ Sarplast – Italy.

Re 2015_22‐EEHC_SAG‐OC‐L‐00162 ‐Re Alternatives Civil Structure for Air Defense Forces. Nomination of Additional Piping Supplier ‐ 1. Sider Piping – Commercial Italy

23/May/16

2015_22‐EEHC_SAG‐OC‐L‐00161

2015_22‐EEHC_SAG‐OC‐L‐00168

2015_22‐EEHC_SAG‐OC‐L‐00174

YES

2/Jun/16

Daily Reports from 14 May to 20 May 2016. General Nomination of Additional Piping Supplier ‐ 1. Marly Pumps – Commercial Italy Orascom Construction Scope ‐ Invoice No.2. Commercial

NO

Closed

179 2015_22‐OC‐EEHC‐L‐00179

2/Jun/16

Daily Reports from 21 May to 27 May 2016.

General

NO

Closed

180 2015_22‐OC‐EEHC‐L‐00180

6/Jun/16

The Reduction of the Advance Payment Letters of Guarantee.

Commercial

YES

Closed

181 2015_22‐OC‐EEHC‐L‐00184

6/Jun/16

Nomination of Additional Valves Supplier.

Commercial

YES

11/Jun/16

Closed

182 2015_22‐OC‐EEHC‐L‐00185

6/Jun/16

Commercial

YES

11/Jun/16

Closed

183 2015_22‐OC‐EEHC‐L‐00186

7/Jun/16

Commercial

YES

11/Jun/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00179

184 2015_22‐OC‐EEHC‐L‐00187

7/Jun/16

Commercial

YES

11/Jun/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00180

185 2015_22‐OC‐EEHC‐L‐00188

7/Jun/16

Commercial

YES

Closed

2015_22‐EEHC_OC‐L‐00001

Nomination of Additional Large HDPE Pipes Supplier ‐ Pipelife Norge AS. Re 2015_22‐EEHC_SAG‐OC‐L‐00174 ‐ Nomination of Additional Piping Supplier. Re 2015_22‐EEHC_SAG‐OC‐L‐00158 ‐Nomination of Additional Sump Pumps Supplier. Re 2015_22‐EEHC_SAG‐OC‐L‐00166 ‐Nomination of Additional Carbon Steel and st. steel pipes, Valve and Fittings Supplier.

NO

Closed

Closed 4/Jun/16

Closed

2015_22‐EEHC_SAG‐OC‐L‐00175

2015_22‐EEHC_SAG‐OC‐L‐00178

approved Cunado

186 2015_22‐OC‐EEHC‐L‐00181

9/Jun/16

Auxiliary system P & lDs for GHG, GM and QFB.

Mechanical

YES

Closed

187 2015_22‐OC‐EEHC‐L‐00190

9/Jun/16

Daily Reports from 28 May to 03 June 2016.

General

NO

Closed


188 2015_22‐OC‐EEHC‐L‐00183

12/Jun/16

Nomination of Additional Steel Structure supply and Fabrication supplier ‐ Duferdofin Nucor srl – Italy.

Commercial

YES

189 2015_22‐OC‐EEHC‐L‐00189

12/Jun/16

Site Prepration Agreement ‐ Invoice No.7

Commercial

NO

Closed

190 2015_22‐OC‐EEHC‐L‐00191

13/Jun/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00167 ‐ Re Packing Lists No. Commercial 084 & 094.

YES

Closed

191 2015_22‐OC‐EEHC‐L‐00196

13/Jun/16

Nomination of Additional Pumps Supplier ‐ Garbarino – Italy.

Commercial

YES

192 2015_22‐OC‐EEHC‐L‐00192

21/Jun/16

Site Prepration Agreement ‐ Invoice No.8

Commercial

NO

193 2015_22‐OC‐EEHC‐L‐00193

23/Jun/16

194 2015_22‐OC‐EEHC‐L‐00194

27/Jun/16

195 2015_22‐OC‐EEHC‐L‐00195

27/Jun/16

196 2015_22‐OC‐EEHC‐L‐00197

27/Jun/16

197 2015_22‐OC‐EEHC‐L‐00198

27/Jun/16

198 2015_22‐OC‐EEHC‐L‐00199

27/Jun/16

199 2015_22‐OC‐EEHC‐L‐00200

27/Jun/16

200 2015_22‐OC‐EEHC‐L‐00201

28/Jun/16

201 2015_22‐OC‐EEHC‐L‐00202

28/Jun/16

202 2015_22‐OC‐EEHC‐L‐00203

28/Jun/16

203 2015_22‐OC‐EEHC‐L‐00204

28/Jun/16

204 2015_22‐OC‐EEHC‐L‐00205

3/Jul/16

205 2015_22‐OC‐EEHC‐L‐00206

3/Jul/16

206 2015_22‐OC‐EEHC‐L‐00207

3/Jul/16

207 2015_22‐OC‐EEHC‐L‐00208

4/Jul/16

208 2015_22‐OC‐EEHC‐L‐00209

4/Jul/16

209 2015_22‐OC‐EEHC‐L‐00210

4/Jul/16

210 2015_22‐OC‐EEHC‐L‐00211

10/Jul/16

211 2015_22‐OC‐EEHC‐L‐00212

10/Jul/16

212 2015_22‐OC‐EEHC‐L‐00213

10/Jul/16

213 2015_22‐OC‐EEHC‐L‐00214

10/Jul/16

214 2015_22‐OC‐EEHC‐L‐00182

11/Jul/16

17/Jun/16

18/Jun/16

Closed

2015_22‐EEHC_OC‐L‐00002

2015_22‐EEHC_OC‐L‐00003

Closed Closed

Nomination of additional Fire fighting and detection system Commercial ‐ Safetec – Italy. Nomination of additional Electromechanical Installation Commercial Subcontractors ‐ TAQA ‐ Aarabia. Re 2015_22‐EEHC_SAG‐OC‐L‐00180 ‐ Re Nomination of Commercial Additional Sump Pumps Supplier.

Yes

1/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00005

Yes

1/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00007

Daily Reports from 04 June to 17 June 2016.

General

NO

Commercial

Yes

1/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00008

Commercial

Yes

1/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00006

Commercial

Yes

1/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00006

Commercial

Yes

3/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00009

Civil

NO

Closed

2015_22‐EEHC_OC‐L‐00013

Commercial

Yes

3/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00010

Commercial

Yes

3/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00011

Re 2015_22‐EEHC_SAG‐OC‐L‐00178 ‐ Re Nomination of Additional Suppliers of Valves. Nomination of Additional Valves Supplier. 1 Derval S r l – Italy Nomination of Additional Valves Supplier. 1 Fluitek – Italy Nomination of Additional Valves Supplier. 1 ETV S r L – Italy Guard Dormitory Building Architectural Drawing. Nomination of Additional Valves Supplier. 1 Bermer – Italy Re 2015_22‐EEHC_SAG‐OC‐L‐00170 ‐ Re Nomination of additional piping supplier. Daily Reports from 18 June to 24 June 2016. Nomination of additional valves supplier. 1 Alas Meccanica S r l – Italy Nomination of additional valves supplier.

Closed

Closed

NO

Closed

Commercial

Yes

8/Jul/16

Closed

Commercial 1 Orton Industrial Valves – Italy Re 2015_22‐EEHC_OC‐L‐00007 ‐ Nomination of Additional Commercial Supplier for Sump Pumps.

Yes

8/Jul/16

Closed

Yes

9/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00015

Commercial

Yes

9/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00016

Commercial

Yes

9/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00014

Commercial

Yes

15/Jul/16

Closed

Commercial

Yes

15/Jul/16

Closed

Commercial

Yes

15/Jul/16

Closed

Commercial

Yes

15/Jul/16

Closed

Mechanical

Yes

Re 2015_22‐EEHC_OC‐L‐00005 ‐Nomination of additional Electromechanical Installation Subcontractors. Re 2015_22‐EEHC_OC‐L‐00011 ‐Re Nomination of additional suppliers for piping. Re 2015_22‐EEHC_OC‐L‐00009 ‐Nomination of additional suppliers for valves. Re 2015_22‐EEHC_OC‐L‐00010 ‐Nomination of additional suppliers for valves. Re 2015_22‐EEHC_OC‐L‐00008 ‐Nomination of additional suppliers for valves. Re 2015_22‐EEHC_OC‐L‐00012 ‐Nomination of additional suppliers for valves Standard Colour for Gas Storage Cylinders.

Closed

2015_22‐EEHC_OC‐L‐00018


Nomination of Additional Valves Supplier. 1. Bray Controls – UK 2. ITALVALV – Italy Nomination of Additional Valves Supplier ‐TR Impianti – Italy. Re 2015_22‐EEHC_SAG‐OC‐L‐00175 ‐Re Nomination of Additional Supplier. Re 2015_22‐EEHC_SAG‐OC‐L‐00169 ‐ Works in Firefighting Water Tank. Orascom Construction Scope ‐Invoice no. 3. Re 2015_22‐EEHC_SAG‐OC‐L‐00186 ‐Re‐allocation of Well No.3 Pipeline.

215 2015_22‐OC‐EEHC‐L‐00215

11/Jul/16

216 2015_22‐OC‐EEHC‐L‐00216

11/Jul/16

217 2015_22‐OC‐EEHC‐L‐00218

11/Jul/16

218 2015_22‐OC‐EEHC‐L‐00221

11/Jul/16

219 2015_22‐OC‐EEHC‐L‐00223

13/Jul/16

220 2015_22‐OC‐EEHC‐L‐00220

16/Jul/16

221 2015_22‐OC‐EEHC‐L‐00225

17/Jul/16

Nomination of additional large HDPE pipes supplier ‐ Agru. Commercial

YES

222 2015_22‐OC‐EEHC‐L‐00217

18/Jul/16

Site Prepration Agreement ‐ Invoice No.9

Commercial

YES

223 2015_22‐OC‐EEHC‐L‐00227

18/Jul/16

Re 2015_22‐ EEHC_OC‐L‐00017 ‐ Re Nomination of Additional Suppliers for Valves.

Commercial

Yes

23/Jul/16

Closed

224 2015_22‐OC‐EEHC‐L‐00219

19/Jul/16

Re 2015_22‐ EEHC_OC‐L‐00016 ‐ Nomination of additional Commercial Electromechanical Installation Subcontractors – TAQA.

Yes

24/Jul/16

Closed

225 2015_22‐OC‐EEHC‐L‐00229

21/Jul/16

Re 2015_22‐ EEHC_OC‐L‐00013 ‐ Re Security Requirements Civil of Guard Dormitory Building.

NO

Closed

226 2015_22‐OC‐EEHC‐L‐00230

21/Jul/16

Daily Reports from 25 June to 15 July 2016.

NO

Closed

227 2015_22‐OC‐EEHC‐L‐00231

21/Jul/16

Slope Protection.

NO

Closed

228 2015_22‐OC‐EEHC‐L‐00222

21/Jul/16

229 2015_22‐OC‐EEHC‐L‐00228

21/Jul/16

230 2015_22‐OC‐EEHC‐L‐00224

21/Jul/16

231 2015_22‐OC‐EEHC‐L‐00226

26/Jul/15

232 2015_22‐OC‐EEHC‐L‐00234

26/Jul/15

233 2015_22‐OC‐EEHC‐L‐00233

26/Jul/15

234 2015_22‐OC‐EEHC‐L‐00232

28/Jul/16

235 2015_22‐OC‐EEHC‐L‐00235

28/Jul/16

236 2015_22‐OC‐EEHC‐L‐00236

1/Aug/16

237 2015_22‐OC‐EEHC‐L‐00237

2/Aug/16

238 2015_22‐OC‐EEHC‐L‐00238

4/Aug/16

Re Nomination of additional large HDPE pipes supplier.

239 2015_22‐OC‐EEHC‐L‐00239

7/Aug/16

240 2015_22‐OC‐EEHC‐L‐00241

18/Aug/16

Re 2015_22‐ EEHC_OC‐L‐00014 ‐Re Nomination of additional suppliers for piping ‐ Sarplast. Re 2015_22‐ EEHC_OC‐L‐00018 ‐Re Nomination of additional suppliers for valves RPV. Re 2015_22‐EEHC_SAG‐OC‐L‐00137 ‐ Re Sufficiency of site protection measures. Re 2015_22‐ EEHC_OC‐L‐00020 ‐Re Nomination of additional large HDPE pipes supplier ‐ AGRU Re 2015_22‐ EEHC_OC‐L‐00021 ‐Owner's rejection for additional nomination of valves suppliers. Re 2015_22‐ EEHC_OC‐L‐00015 ‐Re Nomination of additional suppliers for sump pumps Re 2015_22‐ EEHC_OC‐L‐00004 ‐Re Required Technical data ‐ Pumps. Nomination of additional Piping Supplier (Duker)

Commercial

Yes

16/Jul/16

Closed

Commercial

Yes

16/Jul/16

Closed

Commercial

NO

Closed

Mechanical

Yes

Closed

Commercial

NO

Closed

Civil

NO

Closed

General

22/Jul/16

2015_22‐EEHC_OC‐L‐00019

Closed Closed

Commercial

Yes

26/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00022

Commercial

Yes

26/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00023

Civil

NO

Commercial

Yes

30/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00025

Commercial

Yes

30/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00026

Commercial

Yes

22/Jul/16

Closed

2015_22‐EEHC_OC‐L‐00024

Mechanical

NO

Commercial

Yes

2/Aug/16

Closed

2015_22‐EEHC_OC‐L‐00027

Yes

5/Aug/16

Closed

2015_22‐EEHC_OC‐L‐00028

Re 2015_22‐ EEHC_OC‐L‐00025 ‐ Re Nomination of Commercial additional large HDPE pipes supplier. Re 2015_22‐ EEHC_OC‐L‐00019 ‐Re Orascom Construction Commercial Scope ‐Invoice no. 3.

Closed

Closed

NO

Closed

Commercial

Yes

Closed

2015_22‐EEHC_OC‐L‐00028

Shore Protection Authority Permit Payment.

Commercial

NO

Closed

2015_22‐EEHC_OC‐L‐00029

Re 2015_22‐EEHC_SAG‐OC‐L‐00191 ‐Re Drawing for Inhabited Building.

Civil

NO

Closed

2015_22‐EEHC_OC‐L‐00030


241 2015_22‐OC‐EEHC‐L‐00243

21/Aug/16

Site Prepration Agreement ‐ Invoice No.10

242 2015_22‐OC‐EEHC‐L‐00242

23/Aug/16

243 2015_22‐OC‐EEHC‐L‐00244

24/Aug/16

244 2015_22‐OC‐EEHC‐L‐00245

25/Aug/16

245 2015_22‐OC‐EEHC‐L‐00240

25/Aug/16

246 2015_22‐OC‐EEHC‐L‐00246

25/Aug/16

247 2015_22‐OC‐EEHC‐L‐00247

28/Aug/16

248 2015_22‐OC‐EEHC‐L‐00248

3/Sep/16

249 2015_22‐OC‐EEHC‐L‐00249

3/Sep/16

250 2015_22‐OC‐EEHC‐L‐00250

4/Sep/16

251 2015_22‐OC‐EEHC‐L‐00251

6/Sep/16

252 2015_22‐OC‐EEHC‐L‐00252

6/Sep/16

253 2015_22‐OC‐EEHC‐L‐00253

7/Sep/16

254 2015_22‐OC‐EEHC‐L‐00254

9/Sep/16

255 2015_22‐OC‐EEHC‐L‐00255

21/Sep/16

256 2015_22‐OC‐EEHC‐L‐00256

22/Sep/16

257 2015_22‐OC‐EEHC‐L‐00257

22/Sep/16

258 2015_22‐OC‐EEHC‐L‐00259

25/Sep/16

259 2015_22‐OC‐EEHC‐L‐00260

2/Oct/16

260 2015_22‐OC‐EEHC‐L‐00261

4/Oct/16

261 2015_22‐OC‐EEHC‐L‐00262

16/Oct/16

262 2015_22‐OC‐EEHC‐L‐00263

18/Oct/16

263 2015_22‐OC‐EEHC‐L‐00264

20/Oct/16

Decennial Liability Insurance Certificate.

Ciommercial

NO

264 2015_22‐OC‐EEHC‐L‐00258

27/Oct/16

Re 2015_22‐EEHC_OC‐L‐00043 ‐ Nomination of Additional Commercial Telecommunication Supplier

YES

265 2015_22‐OC‐EEHC‐L‐00265

27/Oct/16

Access Control on Site Enforcement.

General

NO

266 2015_22‐OC‐EEHC‐L‐00266

1/Nov/16

Nomination of additional Telecommunication Supplier ‐ FAAC Group – Italy.

Commercial

YES

Nomination of additional Telecommunication Supplier (FGM Electrical Service‐ ITALY) Re 2015_22‐EEHC_OC‐L‐00029 ‐ Re Revised Letter of Guarantee for Shore Protection Authority Nomination of additional Telecommunicaton Supplier. (Tesy Lab ‐ Italy) Orascom Construction Scope ‐Invoice no. 4. Nomination of additional Supplier of sump pumps (Salvatore Robuschi‐ Italy) Nomination of additional Telecommunication Supplier ‐ Universe. Nomination of additional Telecommunication supplier. 1. Commscope 2. Signamax Re 2015_22‐EEHC_OC‐L‐00033 ‐ Re Nomination of additional Telecommunication supplier. Nomination of additional Telecommunication Supplier ‐ Came – Italy. Nomination of additional Main and Fire Water Pumps Supplier ‐ Hyosung Good Spring. Re 2015_22‐EEHC_OC‐L‐00034 ‐Nomination of additional Telecommunications Supplier ‐ LEONI Alternatives Structure for Air Defense Forces. Re 2015_22‐EEHC_OC‐L‐00032 ‐Re Nomination of Additional Supplier of Sump Pumps. Nomination of additional Telecommunication Supplier ‐ CIAS – Italy. Orascom Construction Scope ‐Invoice no. 5.

Commercial

NO

Closed

Commercial

Yes

Commercial

NO

Commercial

Yes

Commercial

NO

Commercial

Yes

29/Aug/16

Closed

2015_22‐EEHC_OC‐L‐00032

Commercial

Yes

1/Sep/16

Closed

2015_22‐EEHC_OC‐L‐00034

Commercial

Yes

8/Sep/16

Closed

2015_22‐EEHC_OC‐L‐00035

Commercial

Yes

8/Sep/16

Closed

2015_22‐EEHC_OC‐L‐00036

Commercial

Yes

8/Sep/16

Closed

Commercial

Yes

10/Sep/16

Closed

2015_22‐EEHC_OC‐L‐00037

Commercial

Yes

10/Sep/16

Closed

2015_22‐EEHC_OC‐L‐00039

Civil

Yes

Commercial

Yes

14/Sep/16

Closed

Commercial

Yes

26/Sep/16

Closed

Commercial

NO

28/Aug/16

Closed

2015_22‐EEHC_OC‐L‐00031

Closed 29/Aug/16

Closed

2015_22‐EEHC_OC‐L‐00033

Closed

Closed 2015_22‐EEHC_OC‐L‐00038

Closed

Re 2015_22‐EEHC_OC‐L‐00036 ‐Re Nomination of additional Telecommunication Supplier. Nomination of additional Piping Supplier ‐ Sarplast & Nsguassero – Italy Re 2015_22‐EEHC_OC‐L‐00041 ‐Nomination of additional Piping Supplier

Commercial

Yes

27/Sep/16

Closed

Commercial

Yes

30/Sep/16

Closed

2015_22‐EEHC_OC‐L‐00041

Commercial

Yes

5/Oct/16

Closed

2015_22‐EEHC_OC‐L‐00042

Clarification for the HDPE Flange Backing.

Mechanical

NO

Closed

e‐mail

Nomination of Additional Telecommunication Supplier ‐ Commercial Microntel (Italy) & Ozak (Turkey). Re 2015_22‐EEHC_OC‐L‐00042 ‐ Nomination of additional Commercial Piping Supplier .

YES

20/Oct/16

Closed

2015_22‐EEHC_OC‐L‐00043

YES

24/Oct/16

Closed

2015_22‐EEHC_OC‐L‐00044

Closed 1/Nov/16

Closed Closed

5/Nov/16

Closed

2015_22‐EEHC_OC‐L‐00045


267 2015_22‐OC‐EEHC‐L‐00267

9/Nov/16

Orascom Construction Scope ‐Invoice no. 6.

Commercial

NO

Closed

268 2015_22‐OC‐EEHC‐L‐00268

9/Nov/16

Re 2015_22‐EEHC_OC‐L‐00044 ‐ Re Nomination of additional suppliers for piping

Commercial

NO

Closed

269 2015_22‐OC‐EEHC‐L‐00269

14/Nov/16

Re 2015_22‐EEHC_OC‐L‐00046 ‐ Re Hydrogen Generating Plant Offer.

Commercial

NO

Closed

270 2015_22‐OC‐EEHC‐L‐00270

15/Nov/16

Re 2015_22‐EEHC_SAG‐OC‐L‐00196 ‐Re Final Site Layout and Security Requirements .

Civil

NO

Closed

271 2015_22‐OC‐EEHC‐L‐00271

16/Nov/16

Nomination of Additional Lighting Fixtures Supplier ‐ C‐Lure ‐ Commercial Italy.

YES

272 2015_22‐OC‐EEHC‐L‐00272

23/Nov/16

Decennial Liability Insurance Policy.

Commercial

YES

Closed

273 2015_22‐OC‐EEHC‐L‐00273

29/Nov/16

Re Project Landscape.

Civil

NO

Closed

274 2015_22‐OC‐EEHC‐L‐00275

1/Dec/16

Access Control on Site ‐ Follow Up.

GEneral

NO

Closed

275 2015_22‐OC‐EEHC‐L‐00276

5/Dec/16

Orascom Construction Scope ‐ Invoice no. 7.

Commercial

NO

Closed

276 2015_22‐OC‐EEHC‐L‐00277

25/Dec/16

Project Landscape.

Civil

NO

Closed

277 2015_22‐OC‐EEHC‐L‐00278

3/Jan/17

Orascom Construction Scope ‐ Invoice no. 8.

Commercial

NO

Closed

2015_22‐EEHC_OC‐L‐00051

278 2015_22‐OC‐EEHC‐L‐00279

3/Jan/17

Nomination of additional Valves Supplier (LESER GmbH & Co. KG)

Commercial

Yes

7/Jan/17

Closed

2015_22‐EEHC_OC‐L‐00049

279 2015_22‐OC‐EEHC‐L‐00280

3/Jan/17

Nomination of additional Telecommunication Supplier (GPS Commercial Standard S.p.a.‐ Italy)

Yes

7/Jan/17

Closed

2015_22‐EEHC_OC‐L‐00050

280 2015_22‐OC‐EEHC‐L‐00281

8/Jan/17

Re 2015_22‐EEHC_OC‐L‐00049 ‐Re Nomination of additional Supplier of Valves.

Commercial

YES

12/01/2017

Closed

281 2015_22‐OC‐EEHC‐L‐00282

11/Jan/17

Orascom Construction Scope ‐ Invoice no. 8.

Commercial

NO

282 2015_22‐OC‐EEHC‐L‐00283

15/Jan/17

Nomination of additional Cable Trays Supplier ‐ Thomas & Commercial Betts – Saudi Arabia.

YES

19/01/2017

Closed

283 2015_22‐OC‐EEHC‐L‐00274

15/Jan/17

Nomination of additional Telecommunication Supplier ‐ Jablotron Alarm.

Commercial

YES

19/01/2017

Closed

284 2015_22‐OC‐EEHC‐L‐00284

15/Jan/17

Re 2015_22‐EEHC_OC‐L‐00050 ‐Re Nomination of additional Telecommunication Supplier.

Commercial

YES

19/01/2017

Closed

2015_22‐EEHC_OC‐L‐00052

285 2015_22‐OC‐EEHC‐L‐00285

19/Jan/17

Nomination of additional Piping Supplier

Commercial

YES

22/Jan/17

Closed

2015_22‐EEHC_OC‐L‐00053

286 2015_22‐OC‐EEHC‐L‐00286

24/Jan/17

The reduction of the Advance Payment Letters of Guarantee.

Commercial

YES

287 2015_22‐OC‐EEHC‐L‐00287

25/Jan/17

Nomination of additional Telecommunication Supplier ‐ Linergy ‐ Italy.

Commercial

YES

30/Jan/17

Closed

2015_22‐EEHC_OC‐L‐00054

288 2015_22‐OC‐EEHC‐L‐00288

29/Jan/17

Re 2015_22‐EEHC_OC‐L‐00053 ‐ Re Nomination of additional Supplier for Piping ‐ IPEX

Commercial

YES

2/Feb/17

Closed

2015_22‐EEHC_OC‐L‐00055

21/Nov/16

Closed

2015_22‐EEHC_OC‐L‐00047

2015_22‐EEHC_OC‐L‐00048

Closed

Closed


289 2015_22‐OC‐EEHC‐L‐00291

2/Feb/17

Orascom Construction Scope‐ Invoice no. 9.

Commercial

Closed

290 2015_22‐OC‐EEHC‐L‐00290

2/Feb/17

Re 2015_22‐EEHC_OC‐L‐00054 ‐ Re Nomination of additional Telecommuniction Supplier.

Commercial

YES

7/Feb/17

Closed

291 2015_22‐OC‐EEHC‐L‐00289

7/Feb/17

Re 2015_22‐EEHC_OC‐L‐00052 ‐Re Nomination of additional Telecommuniction Supplier.

Commercial

YES

11/Feb/17

Closed

292 2015_22‐OC‐EEHC‐L‐00292

10/Feb/17

Nomination of additional Lighting Fixtures Supplier ‐ Linergy Commercial ‐ Italy.

YES

15/Feb/17

Closed

293 2015_22‐OC‐EEHC‐L‐00293

13/Feb/17

Decennial Liability Insurance Certificate.

294 2015_22‐OC‐EEHC‐L‐00294

19/Feb/17

Nomination of additional Lighting Fixtures Supplier ‐ VELAN ‐ Commercial Russia.

Yes

20/Feb/17

Closed

295 2015_22‐OC‐EEHC‐L‐00296

20/Feb/17

Nomination of additional Overhead Travelling Cranes and Miscellaneous Hoists’ Supplier ‐ 1.FAS & KITO 2. MELONI 3. MISIA.

Commercial

Yes

24/Feb/17

Closed

296 2015_22‐OC‐EEHC‐L‐00297

23/Feb/17

Nomination of additional Lighting Fixtures Supplier ‐ Beghelli.

Commercial

Yes

27/Feb/17

Closed

297 2015_22‐OC‐EEHC‐L‐00299

27/Feb/17

Re Nomination of additional Overhead Travelling Cranes and Miscellaneous Hoists' Supplier.

Commercial

Yes

3/Mar/17

Closed

298 2015_22‐OC‐EEHC‐L‐00301

4/Mar/17

The Reduction of the Advance Payment Letters of Guarantee.

Commercial

NO

Closed

299 2015_22‐OC‐EEHC‐L‐00295

7/Mar/17

Operational Electrical Spare Parts for Two Years of Operation.

Commercial

NO

Closed

300 2015_22‐OC‐EEHC‐L‐00300

9/Mar/17

Orascom Construction Scope‐ Invoice no. 10.

Commercial

NO

Closed

301 2015_22‐OC‐EEHC‐L‐00302

21/Mar/17

Re Trip Event of Abu Qir – Burullus Circuit.

Electrical

NO

Closed

302 2015_22‐OC‐EEHC‐L‐00303

23/Mar/17

Offer for Operational Mechanical Spare Parts for Two Years Commercial of Operation.

NO

Closed

303 2015_22‐OC‐EEHC‐L‐00304

28/Mar/17

Access Control to Site.

General

NO

Closed

304 2015_22‐OC‐EEHC‐L‐00305

29/Mar/17

Offer No. 01 for Spare Parts for Two Years of Operation.

Commercial

NO

Closed

2015_22‐EEHC_OC‐L‐00059

305 2015_22‐OC‐EEHC‐L‐00307

19/Apr/17

Orascom Construction Scope‐ Invoice no. 11.

Commercial

NO

Closed

2015_22‐EEHC_OC‐L‐00060

306 2015_22‐OC‐EEHC‐L‐00309

27/Apr/17

Re Supporting Documentation for Invoice no. 11.

Commercial

NO

Closed

307 2015_22‐OC‐EEHC‐L‐00308

9/May/17

Orascom Construction Scope‐ Invoice no. 12.

Commercial

308 2015_22‐OC‐EEHC‐L‐00311

31/May/17

Orascom Construction Scope‐ Invoice no. 13.

Commercial

2015_22‐EEHC_OC‐L‐00056

Closed

2015_22‐EEHC_OC‐L‐00057


309 2015_22‐OC‐EEHC‐L‐00312

31/May/17

Nomination of additional Valves Supplier ‐ Prosave ‐ Korea. Commercial

Yes

310 2015_22‐OC‐EEHC‐L‐00313

4/Jun/17

6/Jun/17

Re Nomination of additional Valves Supplier.

Commercial

NO

311 2015_22‐OC‐EEHC‐L‐00314

6/Jun/17

Nomination of additional Telecommunication Supplier (Fitre S.p.a – Italy)

Commercial

Yes

312 2015_22‐OC‐EEHC‐L‐00306

20/Jun/17

Site Prepration Agreement‐ Invoice No. 11 ‐ Final Invoice

Commercial

NO

Closed

313 2015_22‐OC‐EEHC‐L‐00315

7/May/17

The Reduction of the Advance Payment Letters of Guarantee.

Commercial

NO

Closed

314 2015_22‐OC‐EEHC‐L‐00317

6/Jul/17

Orascom Construction Scope‐ Invoice no. 14.

Commercial

NO

Closed

10/Jun/17

Closed

2015_22‐EEHC_OC‐L‐00062

Closed

2015_22‐EEHC_OC‐L‐00064

Closed

2015_22‐EEHC_OC‐L‐00065


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

B 2.

Intern Siemens

DTL status

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.





Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

B 3.

Intern Siemens

Burullus Progress Report incl. Photos

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project

Power Generation Egypt Business Unit Al Burullus‐4x SCC5‐8000H 2x1 Power Plant Project Progress Report (No. 132) Cutoff date: August 1, 2017

Block (3)


Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project

Table of Contents 1. Project Key Milestones. 2. Progress Summary. 3. Manpower and Equipment. 4. Progress Photos.


Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project

1. Project Key Milestones


Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project

Project Key Milestones

Achieved Date

MV AVAILABLE (BACK ENERGIZING) 42 1ST. IGNITION GT42 POWER TO THE GRID 42 TOAC GT42 (AMENDMENT I) MV AVAILABLE (BACK ENERGIZING) 41 1ST. IGNITION GT41 POWER TO THE GRID 41 TOAC GT41 (AMENDMENT I) MV AVAILABLE (BACK ENERGIZING) 32 1ST. IGNITION GT32 POWER TO THE GRID 32 TOAC GT32 (AMENDMENT I) MV AVAILABLE (BACK ENERGIZING) 31 1ST. IGNITION GT31 POWER TO THE GRID 31 TOAC GT31 (AMENDMENT I) MV AVAILABLE (BACK ENERGIZING) 22 1ST. IGNITION GT22 POWER TO THE GRID 22 TOAC GT22 (AMENDMENT I) MV AVAILABLE (BACK ENERGIZING) 21 1ST. IGNITION GT21 POWER TO THE GRID 21 TOAC GT21 (AMENDMENT I)

13‐Dec‐16 28‐Dec‐16 29‐Dec‐16 21‐May‐17 21‐Dec‐16 22‐Jan‐16 22‐Jan‐16 20‐May‐17 28‐Dec‐16 12‐Jan‐16 12‐Jan‐16 02‐May‐17 31‐Dec‐16 15‐Jan‐16 15‐Jan‐16 22‐May‐17 10‐May‐17 30‐May‐17 30‐May‐17 16‐May‐17 31‐May‐17 31‐May‐17


Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project

2. Progress Summary


Power Generation Egypt Business Unit Al Burullus 4xSCC5-8000H 2x1 Power Plant Project Cutoff Date:August 01, 2017 Building/Area

Progress Summary Phase

Civil

Block (4)

Activity

Status

Remarks

STG for steel structure works annex

Ongoing

(96% Completed)

STG Building cladding works

Ongoing

(60% Completed)

Pipe rack for H.R.S.G steel works Unit (42)

Ongoing

(45% Completed)

Cooling Tower Unit (40) FRP structure works

Ongoing

(42% Completed)

Cooling Tower Unit (40) thermal fills support works

Ongoing

(28% Completed)

Cooling Tower Unit (40) mechanical frame erection works

Ongoing

(28% Completed)

Cooling Tower Unit (40) roof erection works

Ongoing

(28% Completed)

Cooling Tower Unit (40) piping distribution erectoin

Ongoing

(12% Completed)

Cooling Tower Unit (40) mechanical equipment erection works

Ongoing

(28% Completed)

Cooling Tower Unit (40) fan stack works

Ongoing

(28% Completed)

H.R.S.G Outlet duct and Stack assembly works Unit (42)

Ongoing

(30% Completed)

Lightning Protection System for Unit(42)

Ongoing

(60% Completed)

Lightning Protection System for Unit(41)

Ongoing

(60% Completed)

STG for steel structure works annex

Ongoing

(95% Completed)

Pipe rack for H.R.S.G steel works Unit (32)

Ongoing

(75% Completed)

STG Building cladding works

Ongoing

(60% Completed)

E/M

Civil

Cooling Tower Unit (30) FRP structure works

Ongoing

(98% Completed)

Cooling Tower Unit (30) roof erection works

Ongoing

(98% Completed)

Cooling Tower Unit (30) piping distribution erectoin

Ongoing

(98% Completed)

H.R.S.G Galleries and Ladders erection works Unit (31)

Ongoing

(50% Completed)

H.R.S.G Heating surface modules erection works Unit (31)

Ongoing

(91% Completed)

H.R.S.G piping works Unit (31)

Ongoing

(52% Completed)

Assembly and erection of Condenser neck Unit (30)

Ongoing

(50% Completed)

Block (3)

E/M


Power Generation Egypt Business Unit Al Burullus 4xSCC5-8000H 2x1 Power Plant Project Cutoff Date:August 01, 2017 Building/Area

Progress Summary Phase

Activity

Status

Remarks

CTG Building cladding works

Ongoing

(92% Completed)

STG Steel Structure erection works annex

Ongoing

(99% Completed)

STG Building cladding works

Ongoing

(70% Completed)

Feed water pumps steel works

Ongoing

(99% Completed)

LV Switch Gear Building internal painting works

Ongoing

(50% Completed)

LV Switch Gear Building external painting works

Ongoing

(50% Completed)

H.R.S.G Piping erection works for Unit (21)

Ongoing

(98% Completed)

Civil

Block (2)

E/M

Civil

H.R.S.G Piping erection works for Unit (22)

Ongoing

(76% Completed)

Welding outer casing bottom part L.P turbine

Ongoing

(20% Completed)

Assembly and erection of Condenser neck Unit (20)

Ongoing

(70% Completed)

Condensate exctraction pumps erection works Unit (20)

Completed

STG Steel Structure erection works main building

Ongoing

(98% Completed)

STG Building cladding works

Ongoing

(68% Completed)

Feed water pumps steel works

Ongoing

(99% Completed)

Erection Generator Platforms Unit (12)

Ongoing

(90% Completed)

Erection Generator Platforms Unit (11)

Ongoing

(90% Completed)

Seal oil supply system piping works Unit (12)

Ongoing

(26% Completed)

Seal oil supply system piping works Unit (11)

Ongoing

(23% Completed)

Generator Exhaust System piping works Unit (12)

Ongoing

(43% Completed)

Generator Exhaust System piping works Unit (11)

Ongoing

(27% Completed)

Air intake works unit (12)

Ongoing

(80% Completed)

Air intake works unit (11)

Ongoing

(80% Completed)

Welding outer casing bottom part L.P turbine

Completed

Assembly and erection of Condenser neck Unit (10)

Ongoing

(60% Completed)

H.R.S.G piping erection Unit (11)

Ongoing

(77% Completed)

H.R.S.G piping erection Unit (12)

Ongoing

(70% Completed)

Lube oil skid erection works unit (10)

Ongoing

(20% Completed)

Block (1)

E/M


Power Generation Egypt Business Unit Al Burullus 4xSCC5-8000H 2x1 Power Plant Project Cutoff Date:August 01, 2017

Progress Summary

Building/Area

Phase

Activity

Status

Remarks

Seal Well

Civil

PSP Line erection works

Ongoing

(68% Completed)

UPN sheet piles works

Completed

Water Discharge

Civil Velocity Cap UPC concrete works

Completed

Water treatment building finishing works

Ongoing

(95% Completed)

Water treatment building cable trays

Ongoing

(90% Completed)

Water treatment building cabling

Ongoing

(80% Completed)

Pre-treatment treatment system

Ongoing

(90% Completed)

Civil

Waste water system

Ongoing

(85% Completed)

Oil separation system

Ongoing

(85% Completed)

Sewage treatment system

Ongoing

(85% Completed)

Desalination system

Ongoing

(85% Completed)

Demineralization system

Ongoing

(90% Completed)

Neutralization system

Ongoing

(80% Completed)

Water Treatment Plant E/M

Workshop / Warehouse Building

Civil

Workshop / Warehouse building finishing works

Ongoing

(90% Completed)

Administration Building

Civil

Administration building finishing works

Ongoing

(80% Completed)

Gas Compressor Area

E/M

Gas compressor equipment erection works

Ongoing

(95% Completed)

Gate House Building

Civil

Main gate finishing works

Ongoing

(85% Completed)

Secondary Gate House

Civil

Secondary gate finishing works

Ongoing

(65% Completed)

Fire Fighting Station

Civil

Fire fighting station finishing works

Ongoing

(45% Completed)

Pump House

E/M

PAR Line erection works

Ongoing

(62% Completed)

Ducting structure part 5/11

Ongoing

(95% Completed)

Underground piping erection works

Ongoing

(75% Completed)

Gas pipe line fabrication works

Ongoing

(90% Completed)

Gas pipe line welding works

Ongoing

(85% Completed)

Gas pipe line inspected works

Ongoing

(80% Completed)

Fence foundation works

Ongoing

(91% Completed)

Ongoing

(85% Completed)

Duct Bank Underground piping

Gas Pipe Line

E/M

E/M

Permanent Fence

Civil

Fence super structure works Fence finishing works

Ongoing

(41% Completed)

Piles

Civil

Wick drain piles works

Ongoing

6471 out of 10005 piles are finished


Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project

3. Manpower and Equipment


Al Burullus-4x SCC5-8000H 2x1 Power Plant Project (OC - Man power Report) Cutoff Date:August 01, 2017

Day

SR

A

OC

Category Admin Staff and Supervision Personnel (Indirect Manpower)

1 Project Manager

MEGA

OCF

Total Manpower on payroll

Basic Labors on site this day

2

2

Total Manpower on payroll

Basic Labors on site this day

Night

IREM

Total Manpower on payroll

Basic Labors on site this day

1

1

2 Deputy Project Manager

Total Manpower on payroll

GENCO

Basic Labors on site this day

Total Manpower on payroll

ROSA

Basic Labors on site this day

Total Manpower on payroll

Other Sub-Contractors

Basic Labors on site this day

5

4

1

1

4

4

1

1

3

2

Total Manpower on payroll

OC

OCF

MEGA

IREM

GENCO

ROSA

Other SubContractors

Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors on site this day on site this night on site this night on site this night on site this night on site this night on site this night on site this night 0

0

Total Manpower on payroll

Total Basic Labors Total Basic Labors Total Basic Labors on site this day on site this night on site day & night

0

0

9

8

0

8

0

0

5

5

0

5

0

3 Site Manager

1

1

2

1

4

4

0

0

0

4 Construction Manager

7

5

0

0

3

3

1

0

0

10

8

1

9

5 Technical Office Manager

1

1

0

0

5

5

0

0

0

6

6

0

6

6 Technical Office Engineer

14

11

5

4

8

6

0

0

0

21

1

1

1

0

7 Electrical Manager

10

8

0

8

27

21

0

0

0

2

1

0

1

8 Electrical Engineer

14

11

5

5

13

8

1

1

1

0

0

0

33

25

1

26

9 Electrical Supervisors

5

1

4

3

13

11

2

2

0

0

0

0

24

17

0

17

10 Civil Engineers

39

30

40

30

5

35

11 Mechanical Manager

16

14

23

18

2

2

0

2

0

41

34

2

36

12 Mechanical Engineers

36

30

0

1

0

83

68

1

69

13 Civil Supervisors

61

45

0

66

48

6

54

14 Mechanical Supervisors

4

4

0

0

0

29

16

0

16

15 Finisher Supervisors

4

4

4

4

0

16 Material manager

3

2

17 Material controller

10

7

1

5

23

23

11

5

11

9

0

5

3

6

1

1

6

4

18

7

0

0

0

0

5

3

2

0

22

7

0

7

5

0

5

52

34

0

34

5

2

2

36

1

1

0

0

9

7

34

11

6

0

0

0

0

91

55

6

61

7

7

19

17

27

23

3

2

24

0

1

2

0

168

135

27

162

2

2

2

2

4

4

0

0

2

1

9

9

1 1

26 QA/QC Engineers

46

36

0

1

0

12

1

29 Commissioning Supervisor

3

0 6

5

1

1

30

13

0

30 QC Land Surveyors / Assistants ‫مساح‬

4

3

31 QA/QC Supervisor

31

21

32 Surveying Manager

1

1

33 Land Surveyors / Assistants ‫مساح‬

13

10

2

2

2

2

11

8

2

2

34 Land Surveyors / Assistants helper ‫مساعد مساح‬

16

15

2

1

3

2

2

2

1

1

1

1

1

1

26

23

1

1

35 Financial Manager 3

2

5

5

38 Logistics Manager

7

11

5

0 0

0

0

0 1 3

0

2

0

0

1

0

0

0

0

1

0

0

1

0

0

2

1

5

5

1

1

0

2

2

12

9

2

1

0

0

0

5

5

7

6

16

7

0

0

12

8

7

0

1

1

0

0

40 Admin

7

6

4

3

41 Admin Staff

8

5

42 Data Entry

8

5

0

0

43 Secretary

2

1

2

2

44 IT Engineer

1

1

2

2

6

6

3

3

4

4

11

4

45 Planning Engineers 46 Cost Controller

1

0

0

0

47 Timekeepers

26

22

2

2

0

8

1

1

1

0

0

50 Stores Staff

41

31

2

2

51 Stores Staff Helper

24

15

2

2

52 Drivers

110

89

4

53 Supervisor

10

7

1

54 Transportation supervisor

28

18

55 Accommodation Responsible

5

3

56 Copier

5

3

57 Office Boy

29

19

58 Permit Man

3

59 Purchase Supervisor 60 Security 61 Male Nurse Total A

1

1

1

1

3

3

1

194

89

8

3

1024

720

43

38

6

5

1

1

0

0

0

13

5

5

0

22

4

6

0

4

18

14

11

2

11

1

10

7

11

10

2

3

3

6 1

1

5

5

22

14

2

1

3

3

126

113

371

293

3

1

4

45

5

50

2

2

0

2

30

24

1

25

24

21

2

23

0

0

0

0

0

10

0

17

1

1

0

1

0

0

0

39

27

0

27

20

13

1

14

16

13

0

13

5

4

0

4

4

4

0

4

12

10

0

10

0

0 0

0

2

0

0

7

1

0

0

0

39

28

4

32

0

0

0

0

2

2

0

2 52

8

38

0

1

0

143

109

12

121

1

0

0

32

25

3

28

6

28

18

6

24

0

5

3

0

3

0

5

3

0

3

0

84

56

2

58

5

3

0

3

0

239

119

103

222

0

186

1

7

6

0

0

0

0

1

0

8

0

3 0

4 58

30

95

0

0

46

11 0

0

60

18

124

0

68

2

1

1 0

3

0

8

267

60

0 0

0

0

0

5

1 0

2

0

0

55

1 0

0

21

5

83

10

0

9

27

1 13

17

6 0

9

0 0

12

0

2

0

1 13

21

0

0

9

1 14

0

0

3

32

8 1

0

0

6

1

0 0

0

1

12

1

8 1

0

48 Procurement Staff 49 Warehouse Manager

8

7

0

11

0

0

1

0

0

0

39 HR

11

2 9

0 13

27 coordinator

37 Document Controllers

0

0

28 inspector

36 Accounts Staff

0

(Detailes Currently Not Available)

1 1

0

0 0

86

23 Workshop Mechanics Helper

0

4

0 0

47

25 QS Engineers

5

0

112

24 Pump Engineer

1

1 15

20 HSE Engineers / Officers / Helper

22 Workshop Mechanics

1

1 15

19 HSE Engineers

21 QA/QC Manager

3

5

(Detailes Currently Not Available)

3

2

0

(Detailes Currently Not Available)

18 HSE Manager

1

12

0

0

0

3

23

0 0

0

0

11

1

12

14

7

3

10

1,831

1,288

212

1,500


Al Burullus-4x SCC5-8000H 2x1 Power Plant Project (OC - Man power Report) Cutoff Date:August 01, 2017

Day

SR

OC

Category

OCF Total Manpower on payroll

MEGA Total Manpower on payroll

Night

IREM Total Manpower on payroll

GENCO Total Manpower on payroll

ROSA

3

Dump Driver

10

6

Excavator Drivers

5

3

0

0

1

0

Excavator Drivers Helper

0

0

1

1

0

loader Drivers

6

3

0

0

2

Forklift Drivers

3

2

1

1

0

0

Compactor Drivers

1

1

Trailer Drivers

6

5

Trailer Drivers Helper

5

5

Agricultural Tractor Drivers ‫سائق جرار‬

14

8

0

0

Crane Drivers

48

30

6

6

11

10

Basic Labors on site this day

Basic Labors on site this day

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

IREM

GENCO

ROSA

Other SubContractors

Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors on site this day on site this night on site this night on site this night on site this night on site this night on site this night on site this night 0

3

2

1

4

0

4

3

0

3

10

6

0

6

5

3

1

4

0

1

1

0

1

0

6

3

2

5

10

7

1

8

1

1

0

1

1

0

0 8

4

0

0

0

0

0

16

13

0

0

8

4

Total Basic Labors Total Basic Labors Total Basic Labors on site this day on site this night on site day & night

5

0

4

Total Manpower on payroll

12

0

3

0

4

0

0

0

0

1

0

9

0

9

5

5

0

5

14

8

3

11

78

53

5

58

Crane Helper

1

1

12

11

0

11

1

1

0

1

1

0

1

Concrete Mixer Drivers

0

0

0

0

0

0

0

Concrete Mixer Chiseler

0

0

0

0

0

0

0

Pump Operator

1

1

0

1

1

0

1

Pump Operator Helper

11

6

1

11

6

1

7

Equipment Operators ‫سائق معدة‬/ ‫مشغل‬

0

0

7

6

7

6

0

6

Equipment Electrical

3

3

2

2

Equipment Electrical Helper

1

0

Carpenters Forman ‫ريس نجارين‬

9

7

Site Carpenters ‫نجارين موقع‬

96

66

0

0

0

0

4

3

Carpenter Helper ‫مساعد نجار‬

6

6

Grinder‫حجار‬

36

33

8

0

Steel Fixers Forman ‫ريس حدادين‬

4

4

3

3

Steel Fixers ‫حدادين‬

33

30

0

0

Grinder Helper

Steel Fixers Helper

9

9

Scaffolders Technical

10

9

0

0

21

17

5

3

14

13

187

152

63

26

144

115

4

4

8

7

26

17

11

2

0

0

0

1

2 19

0

0

0 0

0

0

0

0

0

0

Scaffolders Foreman ‫ريس شده‬

Scaffolders Helper

0

0

Scaffolders ‫عمال شده‬ Scaffolders Carpenters

0

0

14

Concrete Mixer Forman

Civil 21

MEGA

(Detailes Currently Not Available)

5

4

5

Basic Labors on site this day

(Detailes Currently Not Available)

4

12

Total Manpower on payroll

Bobcat Drivers

Basic Labors on site this day

(Detailes Currently Not Available)

3

Basic Labors on site this day

OCF

Basic Labors on site this day

Equipment Operators ‫سائق معدة‬/ ‫مشغل‬

2

Total Manpower on payroll

OC

Total Manpower on payroll

B Work Men (Direct)

1

Other Sub-Contractors

244

75

12

6

1

0 0

Bentonite Technician

0

0

0

0

9

7

2

9

100

69

19

88

6

6

0

6

44

33

0

33

0

0

0

0

7

7

0

7

33

30

0

30

9

9

0

9

254

84

1

85

0

52

39

2

41

0

5

394

293

25

318

8

7

1

8

0

30

21

1

22

1

0

0 0

5 1

0

9 0

0 1

2

1

labors leader ‫ريس عمال‬

5 0

20

Concrete Forman ‫مشرف خرسانة‬ Concrete Labor ‫فورمجيه‬

5 1

0

0

labors ‫عمال‬

0

0

0

0

11

2

9

11

0

0

0

0

0

0

0

0

0

0

0

0

Chiseler Forman ‫نحات‬

3

2

0

3

2

0

2

Chiseler ‫نحات‬

36

28

2

36

28

2

30

Plumbing Foreman ‫مشرف سباكين‬

2

2

0

2

2

0

2

Plumbers ‫سباكين‬

25

15

5

25

15

5

20

Plumber Helper ‫مساعد سباك‬

24

19

24

19

4

23

Electrician Supervisor ‫مشرف كھربائي‬

32

28

38

31

0

31

Electricians ‫كھربائية‬

93

75

148

107

12

119

Electrician Helper ‫مساعد كھربائي‬ Total B

4

2

2

15

1

6

3

38

29

11

10

0

0

18

4

25

21

803

616

30

28

101

34

266

207

0 0

0

0

0

19

4

305

98

9

486

486

0 0

0

3

1

0

0

0

88

0

0

10

0 0 0

0

0

73

39

1

40

1,991

1,469

98

1,567


Al Burullus-4x SCC5-8000H 2x1 Power Plant Project (OC - Man power Report) Cutoff Date:August 01, 2017 SR

Day

C Architectural Work Men (Direct)

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39

Total Manpower on payroll

Basic Labors on site this day

Total Manpower on payroll

Night GENCO

IREM

Basic Labors on site this day

Total Manpower on payroll

Basic Labors on site this day

Total Manpower on payroll

ROSA

Basic Labors on site this day

Total Manpower on payroll

Other Sub-Contractors

Basic Labors on site this day

Total Manpower on payroll

OC

OCF

MEGA

IREM

GENCO

ROSA

Other SubContractors

Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors on site this day on site this night on site this night on site this night on site this night on site this night on site this night on site this night

Total Manpower on payroll

Total Basic Labors Total Basic Labors Total Basic Labors on site this day on site this night on site day & night

Mason Supervisor ‫مشرف بنايين‬

1

1

0

1

1

0

1

Mason Foreman ‫ريس بنايين‬

2

2

0

2

2

0

2

Mason Helper

0

0

0

0

0

0

0

0

0

0

0

15

0

15

Mason ‫بنا‬ Plasters ‫مبيض محاره‬

18

15

0

18

Plasters Helper ‫مساعد مبيض محاره‬ Accessories Plaster ‫)اكسسورات(مبيض محاره‬

10

8

0

10

8

0

8

11

10

0

11

10

0

10

Accessories Plaster Helper ‫)اكسسورات(مساعد مبيض محاره‬

5

4

5

4

0

4

Painter Forman ‫ريس نقاش‬

2

2

4

4

0

4

Painter ‫نقاش‬

19

17

82

45

0

45

Painter Helper ‫مساعد نقاش‬

3

3

Forman

0

23

8

2

2

15

10

2

0

0 25

10

0

0

0

0

0

0 5

5

0

0

Silicon Technician ‫فني سيليكون‬ Tiller

0

0

Tiller Helper

0

0

Supervisor Mechanical Rigger ‫مشرف عمال ميكانيكي بحريه‬

4

4

118

82

Rigger

0 0

2

2

Rigger Helper Fitter ‫براد‬ Fitter Foreman Civil Workshop ‫ريس برادين ورشه‬

114

97

0

0

7

3

13

7

10

1

49

24

71

51

83

36

3

2

6

0

Steel Fitter

2

2 39

86

47

111

40

Steel Grinder

3

3

18

14

0

0

70

20

Electrical Fitter Erection Fitter

118

93

Fitter Helper

57

51

0

0

Erection Grinder

4

4

27

9

Erection Helper

4

2

Welders Foreman

2

2

0

49

Steel Helper Cable Tay Helper

0

37

15

14

3

0 25

1

0

0

4

71

0 0

0

0

0 0 0

0

0

0

0 0

0 0

66

43

46

31

16

12

0 11

0

0

(Detailes Currently Not Available)

4

Basic Labors on site this day

MEGA

(Detailes Currently Not Available)

3

Total Manpower on payroll

OCF

(Detailes Currently Not Available)

1 2

OC

Category

0

0

0

0

0

0

3

0

5

0

0

0

0

0

0

0

0

0

0

0

0

34

15

1

16

323

195

100

295

3

2

0

2

120

97

0

97

2

2

0

2

135

86

0

86

114

43

0

43

18

14

0

14

37

15

0

15

14

3

0

3

5

254

156

18

174

57

51

0

51

6

77

44

6

50

3

20

14

3

17 16

3

2

8

6

1

1

24

14

2

34

9

28

0

0

0

62

9

0

9

Plate Welder

15

4

10

8

0

2

25

12

2

14

0

0

45

26

0

26

0

4

47

25

4

29

0

2

0

82

47

2

49

GTAW Welder

15

3

14

13

Tack Welder

23

8

24

17

SMAW Welder

14

7

62

34

6

6

0

3 5

Welding Grinder

16

4

13

3 7

10

0

0

Welders

62

58

0

0

3

1

14

8

29

3

0

0

0

0

0

108

70

0

70

Welders Helper

20

18

1

0

31

14

41

32

99

7

0

0

0

6

0

192

71

6

77

Welders Civil Workshop ‫لحامين ورشه‬

1

1

1

1

0

1

0

0

0

0

1,937

1,109

144

1,253

0

Grinder Civil Workshop Total C

575

474

8

7

323

114

504

332

0

0

527

182

0

0

38

0

1

34

0

71

0


Al Burullus-4x SCC5-8000H 2x1 Power Plant Project (OC - Man power Report) Cutoff Date:August 01, 2017 SR.

Day OCF

OC

Category Total Manpower on payroll

Basic Labors on site this day

1 Crane Mechanical

2

2

2 Mechanical

15

8

3 Mechanical Helper

4

2

D Work Men. Mechanical (Direct)

Total Manpower on payroll

MEGA

Basic Labors on site this day

27

Basic Labors on site this day

GENCO

Total Manpower on payroll

Basic Labors on site this day

0

0

Total Manpower on payroll

Other Sub-Contractors

ROSA

Basic Labors on site this day

Total Manpower on payroll

Basic Labors on site this day

Total Manpower on payroll

OC

OCF

MEGA

IREM

GENCO

ROSA

Other SubContractors

Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors on site this day on site this night on site this night on site this night on site this night on site this night on site this night on site this night 0

4 Mechanical Fitter 5 Man lift Driver

Total Manpower on payroll

Night

IREM

17

12

5

4

3

2

0

21

12

20

16

36

17

5

4

0

0

6 Filter supervisor

0

0

7 Filter Grinder

0

0

8 Filter Fitter

2

0

1

4

2

Total Basic Labors Total Basic Labors Total Basic Labors on site this day on site this night on site day & night

2

2

0

2

15

8

2

10

0

0

0

22

10

1

11

0

0

0

77

45

0

45

0

1

32

21

5

26

0

0

0

0

2

2

0

2

0 2

Total Manpower on payroll

0

0

0

0

5

5

0

0

5

5

0

5

148

115

1

1

7

4

17

0

0

156

120

17

137

10 Erection Helper

9

6

9

2

0

0

1

0

0

18

8

1

9

11 Grader Driver

2

2

2

2

0

2

43

21

0

21

153

74

0

74

67

30

0

30

142

80

0

80

20

9

0

9

2

2

0

2

10

8

1

9

32

23

0

23

80

43

0

43

2

2

8

8

33

11

13 Piping Grinder

22

11

57

47

74

16

14 Piping Helper

11

9

8

7

48

14

15 Piping Fitter

25

19

48

37

69

24

0

(Detailes Currently Not Available)

12 Piping Forman

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

1

0

0

0

0

(Detailes Currently Not Available)

0

(Detailes Currently Not Available)

9 Erection Supervisor

16 Grinder Mechanical

13

4

7

5

17 haydrotest Supervisor

0

0

2

2

18 Supports Foreman

2

2

8

6

15

11

17

12

14

7

5

4

21 Supports Helper

0

0

1

0

0

0

1

0

0

0

22 Painting forman

0

0

1

1

0

0

1

1

0

1

60

47

0

0

19 Supports Fitter 20 Supports Grinder

32

29

29

3

38

0

9

0

23 Insulation

26

20

124

76

0

76

24 Instrument Fitter

1

1

0

0

1

1

0

1

25 E &I Fitter

9

1

0

9

1

0

1

0

0

0

0

101

1

102

26 Welders Mechanical 27 Technical

101

94

1

1

3

1

1

1

18

4

1

0

3

3

5

0

19

2

85

60

46

14

24

4

205

110

351

271

0

0

393

112

1019

Basic Labors on site this day

Total Manpower on payroll

Basic Labors on site this day

Total Manpower on payroll

Basic Labors on site this day

Total Manpower on payroll

Basic Labors on site this day

Total Manpower on payroll

28 Erection Mechanical

57

44

29 Helper

268

218

Total D

665

537

4

OCI Manpower

Total Manpower on payroll

Basic Labors on site this day

Total Manpower on payroll

Basic Labors on site this day

Total Manpower on payroll

0

0

0

124 60

47

5

52

0

0

0

418

294

24

318

30 Welders Mechanical Helper

OCF

OC

MEGA

IREM

GENCO

ROSA

1019

55

0

0

2

0

0

0

Other Sub-Contractors

OC

OCF

MEGA

IREM

GENCO

ROSA

Other SubContractors

Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors Basic Labors on site this day on site this night on site this night on site this night on site this night on site this night on site this night on site this night

0

0

0

0

2,637

2,053

57

2,110

Total Manpower on payroll

Total Basic Labors Total Basic Labors Total Basic Labors on site this day on site this night on site day & night

Direct

2043

1627

42

39

629

258

1121

810

0

0

1225

392

1505

1505

181

0

1

46

0

71

0

6565

4631

299

4930

Indirect

1024

720

43

38

126

113

371

293

0

0

267

124

0

0

186

0

3

23

0

0

0

1831

1288

212

1500

Total

3067

2347

85

77

755

371

1492

1103

0

0

1492

516

1505

1505

367

0

4

69

0

71

0

8396

5919

511

6430


0 29‐Jul‐17

21‐Jul‐17

13‐Jul‐17

5‐Jul‐17

27‐Jun‐17

19‐Jun‐17

11‐Jun‐17

3‐Jun‐17

26‐May‐17

18‐May‐17

10‐May‐17

2‐May‐17

24‐Apr‐17

16‐Apr‐17

8‐Apr‐17

31‐Mar‐17

23‐Mar‐17

15‐Mar‐17

7‐Mar‐17

27‐Feb‐17

19‐Feb‐17

11‐Feb‐17

3‐Feb‐17

26‐Jan‐17

18‐Jan‐17

10‐Jan‐17

2‐Jan‐17

25‐Dec‐16

17‐Dec‐16

9‐Dec‐16

1‐Dec‐16

23‐Nov‐16

15‐Nov‐16

7‐Nov‐16

30‐Oct‐16

22‐Oct‐16

14‐Oct‐16

6‐Oct‐16

28‐Sep‐16

20‐Sep‐16

12‐Sep‐16

4‐Sep‐16

27‐Aug‐16

19‐Aug‐16

11‐Aug‐16

3‐Aug‐16

26‐Jul‐16

18‐Jul‐16

10‐Jul‐16

2‐Jul‐16

24‐Jun‐16

16‐Jun‐16

8‐Jun‐16

31‐May‐16

23‐May‐16

15‐May‐16

7‐May‐16

29‐Apr‐16

21‐Apr‐16

13‐Apr‐16

5‐Apr‐16

28‐Mar‐16

20‐Mar‐16

12‐Mar‐16

4‐Mar‐16

25‐Feb‐16

17‐Feb‐16

9‐Feb‐16

1‐Feb‐16

24‐Jan‐16

16‐Jan‐16

8‐Jan‐16

31‐Dec‐15

23‐Dec‐15

15‐Dec‐15

7‐Dec‐15

29‐Nov‐15

21‐Nov‐15

13‐Nov‐15

5‐Nov‐15

28‐Oct‐15

20‐Oct‐15

12‐Oct‐15

4‐Oct‐15

26‐Sep‐15

18‐Sep‐15

7,000

10‐Sep‐15

2‐Sep‐15

25‐Aug‐15

17‐Aug‐15

9‐Aug‐15

1‐Aug‐15

24‐Jul‐15

16‐Jul‐15

8‐Jul‐15

30‐Jun‐15

Al - Burullus Combined Cycle Power Plant Project (Total - Manpower Curve)

8,000

Total Day Shift

Total Night Shift

6,000

Total Day Shift

Total Night Shift

5,000

4,000

3,000

2,000

1,000


Al Burullus-4x SCC5-8000H 2x1 Power Plant Project Equipment Daily Report Cutoff Date:August 01, 2017

Day Shift

Sr. EQUIPMENT DETAILS

OC (OED)

OC Renting Equipment

OC Foundation

IREM

1

CRANE CROWLER SANY 700 TONS

2

CRANE CROWLER SANY500 TONS

‫ طن‬500‫ونش كاتينة‬

3

CRANE CROWLER 400 TONS

‫ طن‬400 ‫ونش كاتينة‬

1

4

CRANE CROWLER SANY 300 TONS

‫ طن‬300 ‫ونش كاتينة‬

1

5

CRANE CROWLER SANY225 TONS

‫ طن‬225 ‫ونش كاتينة‬

1

6

CRANE CROWLER SANY 160TONS

‫ طن‬160 ‫ونش كاتينة‬

7

CRANE CROWLER SANY 55 TONS

‫ طن‬55 ‫ونش كاتينة‬

1

8

CRANE CROWLER SANY 50 TONS

‫ طن‬50 ‫ونش كاتينة‬

7

9

CRANE GROVE 160 TONS

‫ طن‬160 ‫ونش‬

10 CRANE GROVE 130 TONS

‫ طن‬130 ‫ونش‬

11 CRANE GROVE 120 TONS

‫ طن‬120 ‫ونش‬

12 CRANE GROVE 100 TONS

‫ طن‬100‫ونش‬

13 CRANE GROVE 90 TONS

‫ طن‬90‫ونش‬

3

16 CRANE GROVE 70 TONS

‫ طن‬70 ‫ونش‬

1

17 CRANE GROVE 60 TONS

‫ طن‬60 ‫ونش‬

18 CRANE GROVE 65 TONS

‫ طن‬65 ‫ونش‬

7

19 CRANE CROWLER 50 TONS

‫ طن‬50 ‫ونش‬

3

20 CRANE GROVE 40 TONS

‫ طن‬40 ‫ونش‬

1

1

1 1

1

1

1

1

1

1

2

6

2

6

3

‫ طن‬35 ‫ونش‬

5

‫ طن‬12.5 ‫ونش‬

2

‫ طن‬30 ‫ونش‬

24 Tower Crane

1

1 2

1

3

5 7

25 Bored Piles Rigs

1

26 Driven Piles Rigs 27 Bobcat

4

1

2

3

3 ‫لودر‬

29 Baco LOADER. 30 Excavator

OC (OED)

1

‫ طن‬80 ‫ونش‬

28 Loader

ROSA

1

‫ طن‬75 ‫ونش‬

23 CRANE GROVE 30 TONS

GENCO

1

14 CRANE GROVE 80 TONS

21 CRANE CROWLER 35 TONS

MEGA

1

15 CRANE GROVE 75 TONS

22 CRANE CROWLER 12.5TONS

Night Shift

5

29

1

1 ‫حفار‬

1

3

31

31 Grader CAT-140G

1

1

32 Generator volvo-40 K.V.A ‫مولد‬

2

33 Generator volvo-60 K.V.A ‫مولد‬

3

1 2 4

34 Generator volvo-90 K.V.A ‫مولد‬ 35 Generator volvo-105 K.V.A ‫مولد‬

1

3

1

36 Generator volvo-135 K.V.A ‫مولد‬

2

37 Generator volvo-125 K.V.A ‫مولد‬

2

38 Generator volvo-175 K.V.A ‫مولد‬

1

1

39 Generator volvo-200 K.V.A ‫مولد‬

9

1

40 Generator volvo-211 K.V.A ‫مولد‬

1

41 Generator volvo-225 K.V.A ‫مولد‬ 42 Generator volvo-250 K.V.A ‫مولد‬

7

1

2

43 Generator volvo-275 K.V.A ‫مولد‬

2

44 Generator volvo-315 K.V.A ‫مولد‬

4

45 Generator 450 K.V.A

1

46 Generator volvo-410 K.V.A ‫مولد‬

1

47 Generator volvo-500 K.V.A ‫مولد‬

4

48 AIR COMPRESSOR 49 AIR COMPRESSOR ATLAS XA-186DD

1 ‫كومبريسسور‬

50 AIR COMPRESSOR ATLAS XATS-156DD

1

1

5

7

51 AIR COMPRESSOR SULLAIR 300 52 SOIL Compactor

2

2 2

3 2

3

53 LIGHTING TOWER ATLAS QAX - 12

5

2

54 Mobile- Concrete pump s42 sx

1

55 CONCRETE-TRUCK MIXER MERCEDES 10m

2

56 CONCRETE-TRUCK MIXER MERCEDES 8m

‫ھراس تربة‬

1 6

5

OC Renting Equipment

OC Foundation

IREM

MEGA

GENCO

ROSA


Al Burullus-4x SCC5-8000H 2x1 Power Plant Project Equipment Daily Report Cutoff Date:August 01, 2017

Day Shift

Sr. EQUIPMENT DETAILS

OC (OED)

OC Renting Equipment

OC Foundation

IREM

Night Shift

MEGA

GENCO

ROSA

OC (OED)

OC Renting Equipment

OC Foundation

IREM

MEGA

GENCO

ROSA

0

0

0

0

0

0

57 FUEL STATION 45,000 LITER 58 Dumper-Front 59 Welding Machine DESIL

‫ماكينة لحام‬

60 trailer

24

55

2

1

61 Fuel Trailer

2

62 Flate trail

2

2

3

63 Flate trail 8m

1

64 Flate trail 6m

2

65 Flate trail 4m 66 Truck tanker < 22m3 67 Truck 10 Ton

1

68 Truck 4 Ton

3

1

‫ طن‬5 ‫سيارة نقل‬

4

1

‫جرار‬

15

1

69 Truck 5 Ton

6

70 Truck

3

12

71 Tractors 72 Truck 12.5 Ton

7

1

73 Plate Compactor

‫ھراس يدوي‬

74 Mini bus 26 Seat

7

75 Micro Bus 14 seat

18

6

2 8

76 Ambulance

3

1

3

1

77 Double Cabinet

20

5

2

2

8

9

78 Single Cabinet

16

2

2

3

6

79 Cars

36

1

7

3

80 Steel Rebar cutter

6

81 Steel Rebar bender ‫تنايه حديد‬

1

82 Electric Mixer 1/4 M 83 Electric Mixer 3/4 M 84 Vibrator diesel ‫ھزاز‬

1

4

85 Vibrator electrical 86 Helicopter 87 Water Trailer

2

88 Micro Bus 15 seat

2

89 Clark

1

2

4

38

12

90 Saw cut 91 Hammer

3

92 Heater 93 Optical Level 94 Electrical Vibrator Nail ‫ھزاز‬

1

95 Electrical Welding Machine ‫ترانس لحام كھربيه‬

8

96 Welding Machine DESIL ‫ماكينه لحام‬

7

97 Dump Truck

4

10

160 52

65

4

98 Block Saw Cut Golz 16 Inch 99 Washing Machine 200 Par

1

100 Truck 10 Ton Scania 101 Forklift ‫شوكه‬

2

2

1

10

1

102 Small Air Compressor 500 litre 103 Man Lift

1

11

104 Bentonite Tank 2.5*2.5*6 M

4

5

1

229

68

18

105 Bentonite Tank 2*2.5*6 M 106 Bentonite Mixer 1000hp 107 Bentonite Mixer 1500hp

3

108 Decender 2000hp 109 Water Tank

‫تنك مياه‬

110 Sand Blast 111 Drilling Machine

10

112 Drill Press Machine 113 Water Pump

30

4

114 Vaccum machine 115 Oil filter mchine

2 Total

239

128

135

162

112

19


Power Generation Egypt Business Unit Al Burullus 4x SCC5‐8000H 2x1 Power Plant Project

4. Progress Photos


Power Control Center (40): Steel erection works.

STG Unit (40): Steam turbine Works.


STG Unit (40): Base module Works.

STG Turbo Set (40): Low pressure turbine outer casing erection works.


STG Unit (40): Condenser Works.

HRSG Unit (41): Piping & casing erection Works.


HRSG Unit (42): Piping & casing erection Works.

HV Transformer Unit (40): Placement works


Cooling Tower Unit (40): FRP works.

STG Building (30): Steam turbine works.


STG Turbo Set (30): Low pressure turbine outer lower casing erection works.

STG Building (30): Base Module works.


STG Building (30): GRP steel erection works.

HRSG (31): Stack & external piping erection works.


HRSG (32): Stack & external piping erection works.

HV Transformer Unit (30): Main transformer works.


Cooling Tower Unit (30): FRP & cladding works.

Pipe Rack HRSG Unit (22): Erection works.


HRSG (21): Stack erection & external piping works.

HRSG (22): Stack erection & external piping works.



STG Building (20): Base Module works.

STG Block (20): GRP piping Works.


STG Building (20): Annex wall cladding works.

STG Building (20): Annex Roof cladding works.


HV Transformer Unit (20): Erection works.

Cooling Tower Unit (20): FRP & cladding works.


CTG Turbo Set (11): Gas turbine enclosure works.

CTG Turbo Set (12): Gas turbine enclosure works.


MV Auxiliary & Generator Transformer (Unit 11): Iso phase bus duct works.

MV Auxiliary & Generator Transformer (Unit 12): Iso phase bus duct works.


Pipe Rack HRSG (12): Steel erection & piping works.

HRSG (11): Stack & external piping erection Works.


HRSG (12): Stack & external piping erection Works.

Power Control Center (10): Erection Works.


STG Turbo Set (10): Steam generator works.

STG Block (10): GRP piping Works.


STG Building (10): Annex roof cladding Works.

STG Building (10): Annex walls cladding Works.


HV Transformer Block (10): Erection Works.

Sealing End Unit (10): Erection works.


PCC Cooling Tower Unit (11): Erection works.

Cooling Tower Unit (10): FRP & cladding Works.


Administration Building: External finishing works.

Hypochlorite: Mechanical erection works.


Fire Station Building: Plastering works. e

Dormitory Building: External finishing works.


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

B 4.

Intern Siemens

Payment Report

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Site Preparation Agreement for Burullus Combined Cycle Power Project - 4800 MW

Payment Report August 9, 2017 Invoice #

Total Amount (EURO)

Total Amount (EGP)

Amount Due (EURO)

Amount Duw (EGP)

Invoice Submission Date

Payment Due Date

Actual Payment Date

Amount Received Exchange Rate Used EURO

EGP

Adv. 1

N.A.

9,372,486.75

09-Aug-15

27-Aug-15

26-Aug-15

80,447,802.77

Adv. 2

N.A.

3,124,162.25

10-Sep-15

04-Oct-15

30-Sep-15

26,996,198.42

Invoice # 1 (Works up to Sep 30, 2015)

4,035,267.59

2,824,687.31

27-Oct-15

16-Nov-15

23-Nov-15

25,322,756.79

Invoice # 2 (Works up to Nov 15, 2015)

7,911,010.26

5,537,707.18

03-Dec-15

23-Dec-15

21-Dec-15

45,077,490.22

6-Jan-16 Partial Payment

16,358,274.77

13-Jan-16

44,850,481.77

Invoice # 3 (Works up to Dec 15, 2015)

10,350,505.90

7,245,354.13

24-Dec-15

13-Jan-16

13,802,315.52

9,661,620.86

21-Jan-16

10-Feb-16

7-Feb-16

81,351,351.12

Invoice # 5 (Works up to Feb 15, 2016)

19,215,086.21

13,450,560.35

03-May-16

23-May-16

15-May-16

136,375,231.36

23-Aug-26

49,239,086.53

22,000,820.99

19-May-16

08-Jun-16

24,151,538.84

166,630,387.96 Invoice # 7 (Works for April and May, up to May 15, 2016)

53,875,462.52

48,487,916.27

13-Jun-16

04-Jul-16

23,406,913.66

21-Jun-16

13-Jul-16

Invoice # 9 (Works up to July 15, 2016)

14,878,657.95

13,390,792.16

18-Jul-16

10-Aug-16

144,291,736.93

Invoice # 10 (Works up to Aug 15, 2016)

15,111,968.76

13,600,771.88

21-Aug-16

08-Sep-16

150,105,675.69

-

-

20-Jun-17

10-Jul-17

OC Estimated Contract Price (Payable in EGP) Final Contract Price

8.1401

8.4201 10.1390

9.8119

9.8645 26,007,681.84

Total

8.9648

531,454,500.03

Invoice # 8 (Works up to June 15, 2016)

Invoice # 11 (Close-out)

8.6411

8.4481

Invoice # 4 (Works up to Jan 15, 2016)

Invoice # 6 (Works up to March 15, 2016)

8.5834

189,339,495.39

62,483,245.00 2,000,000,000.00

187,880,587.34

187,880,587.34

187,880,587.34

187,880,587.34

01-Dec-16

256,734,831.28

-

EURO EGP

1,755,235,805.64

9.8715 9.6979 9.9329


EPC Contract of Burullus Combined Cycle Power Project - 4800 MW

Payment Report August 9, 2017

Invoice #

Amount (EURO)

Amount Due (EURO)

Amount (EURO Payable in EGP)

Amount Due (EURO Payable in EGP)

Amount Rceived Invoice Date

Payment Due Date

Actual Payment Date Actual Payment Date (EGP Portion) (Euro Portion)

Exchange Rate Used EURO

EGP

Adv. Installment # 1

59,025,000.00

24-Aug-15

31-Aug-15

27-Aug-15

524,212,410.00

8.8812

Adv. Installment # 2

59,025,000.00

02-Sep-15

08-Sep-15

08-Sep-15

513,138,320.00

8.6936

108,868,571.52

03-May-16

23-May-16

22-May-16

1,085,865,639.19

23-Jun-16

181,637,902.50

02-Jun-16

22-Jun-16 20-Jul-16

265,627,422.94

1-Sep-16

353,143,505.00

27-Sep-16

15,779,485.00

Invoice # 1 (Works up to March 31, 2016) Invoice # 2 (Works up to May 31, 2016) Invoice # 3 (Works up to Jun 30, 2016) Invoice # 4 (Works up to July 31, 2016)

10,897,799.60

-

31,457,710.51

24,377,364.30

9,263,129.66

-

27,428,493.74

21,084,269.92

128,080,672.38

53,614,005.11

43,130,999.76

27,634,072.32

45,571,904.34

35,971,910.03

23,125,451.20

13-Jul-16

25-Aug-16

03-Aug-16

9.9741

9.8145

21-Sep-16 30-Sep-16

30-Jan-17

130,483,161.26

9.8172

9.8969

213,090,277.78

Invoice # 5 (Works up to August 31, 2016)

13,896,164.01

12,147,849.05

22,564,882.05

18,844,040.11

22-Sep-16

20-Oct-16

20-Oct-16

185,689,171.00

9.8540

Invoice # 6 (Works up to Sep 30, 2016)

24,479,980.29

21,114,645.10

26,118,724.60

21,894,254.06

09-Nov-16

29-Nov-16

29-Nov-16

410,481,928.00

18.7484

Invoice # 7 (Works up to Nov 30, 2016)

21,601,857.33

18,556,741.23

15,541,836.50

13,015,398.52

05-Dec-16

25 dec 216

29-Dec-16

246,001,140.10

18.9008

Invoice # 8 (Works up to Dec 31, 2016)

Partial Payment

175,334,900.31

24,138,658.21

20,888,032.53

03-Jan-17

23-Jan-17 18-Mar-17

136,894,422.72

19,172,069.45

15,926,085.98

19.6049

18-Mar-17 Invoice # 9 (Works up to Jan 31, 2017)

16,783,236.48

14,414,411.74

13,425,063.30

11,555,040.15

9,833,400.20

8,503,760.94

18,900,415.25

15,916,692.23

07-Feb-16

27-Feb-17

20-Apr-17

09-Mar-17

29-Mar-17

7-Jun-17

27-Apr-17

17-May-17

28-Feb-17

14,414,411.74

63,105,577.28 Partial Payment of EGP 200,000,000.00 portion at an exchange rate of 20.121 57,154,187.08

30-Mar-17

11,555,040.15

112,931,639.57

30-May-17

8,503,760.94

7-Jun-17 Invoice # 10 (Works up to Feb 28, 2017) Invoice # 11 (Works up to Mar 31, 2017)

7,293,613.74

6,055,835.33

7-Jun-17 4,577,975.95

3,745,908.79

29,914,173.35

3-Aug-17

Invoice # 12 (Works up to April 30, 2017)

7,114,979.21

Invoice # 13 (Works up to May 31, 2017)

5,526,367.72

4,940,273.46

31,643,648.61

26,654,240.42

31-May-17

20-Jun-17

Invoice # 14 (Works up to June 30, 2017)

14,831,071.61

13,351,699.01

17,980,375.19

14,538,030.77

06-Jul-17

26-Jul-17

Invoice # 15 (Works up to July 31, 2017)

5,806,814.97

5,224,757.04

4,124,005.67

3,216,440.50

06-Aug-17

24-Aug-17

6,291,831.99

16,936,526.34

14,151,947.73

09-May-17

437,313,822.92

OC Share

787,000,000.00

EURO

OC Portion Payable in EURO

250,000,000.00

EURO

OC Portion Payable in EGP

537,000,000.00

EURO

19.6081 43,535,980.79

29-May-17 6-Aug-17

224,170,467.74

18.6484

277,505,543.04

19.6090

378,958,476.17

20.2098

11,232,105.45

Partial Payment

176,188,479.54

5,470,002,101.82


Report No.:

E-BUR/2017/PR0023

Protection class:

Restricted

B 5.

Intern Siemens

Shipments Status

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.


Burullus Combined Cycle Power Project ‐ Purchase Orders Log SN

PO Date

Type

Dept

F/L

E/M/C

Year

Local Supplier

Foreign Supplier

Item Description

Origin

Delivery Date

Air/Sea

1

10/Aug/15 PO

TPD

L

E

2015 3-Brothers

Lighting Fixtures

Egypt

2

13/Jul/15 PO

TPD

L

E

2015 Global Integrated Systems (GIS)

Fire Alarm System

Far East Inland

Inland

31/Aug/15 10/Aug/15

3

31/Aug/15 PO

TPD

L

E

2015 Grand International

Wiring Devices

France

21/Sep/15

4

15/Jul/15 PO

TPD

L

E

2015 Global Integrated Systems (GIS)

Fire Alarm System

Far East Inland

12/Aug/15

5

22/Jul/15 PO

TPD

L

E

2015 Grand International

Wiring Devices

France

05/Aug/15

6

29/Jul/15 PO

TPD

L

E

2015 Sega-M

LV Panel Boards

Egypt

Inland

11/Oct/15

7

22/Jul/15 PO

TPD

L

E

2015 3-Brothers

Lighting Fixtures

Egypt

Inland

12/Aug/15

8

01/Sep/15 SC

TPD

L

C

2015 E. Mak

Swimming Pool

Egypt

-

31/Oct/15

9

05/Oct/15 SC

TPD

L

E

2015 Otak Trading & Contracting

Lightning Protection and BondinEgypt

-

02/Nov/15 03/Dec/15

Inland

Inland

10

04/Oct/15 SC

TPD

L

C

2015 Sportica AlWadi Spoarts and Leisure Solutions

Sports Playgrounds

Egypt

-

11

30/Aug/15 PO

TPD

L

C

2015 Harmouch

Cement Tiles

Egypt

-

20/Sep/15

12

30/Aug/15 PO

TPD

L

C

2015 Al Mazen

Athletic Equipment

Egypt

-

06/Sep/15

13

13/Sep/15 PO

TPD

L

E

2015 Sega-M

LV Panel Boards

Egypt

-

12/Nov/15

14

16/Dec/15 PO

TPD

L

C

2015 Future

Office Furniture

Egypt

Inland

23/Dec/15

15

15/Sep/15 PO

TPD

L

C

2015 Future

Office Furniture

Egypt

Inland

22/Sep/15

16

10/Sep/15 PO

TPD

L

E

2015 ElSewedy Electrical Equipment & Cables Company

Lighting Fixtures

Egypt

Inland

05/Nov/15

17

12/Mar/17 SC

TPD

L

C

2015 Gardenia

Landscape

Egypt

-

18

17/Sep/15 PO

TPD

L

E

2015 Sega-M

LV Panel Boards

Egypt

Inland

16/Nov/15

19

01/Aug/17 SC

TPD

L

C

2015 Alutec

Aluminum Works

Egypt

-

01/Aug/17

20 16/Nov/15 PO

TPD

L

C

2015 Al Ansar El Dawlia

Commercial Kitchen Hoods

Egypt

Inland

14/Feb/16

21

13/Oct/15 PO

TPD

L

C

2015 Ceramica Cleopatra

Ceramic and Porclain Tiles

Egypt

Inland

03/Nov/15

22

12/Oct/15 PO

TPD

L

E

2015 Egyptian International Investment

Generators

UK

Inland

26/Oct/15

23

12/Oct/15 PO

TPD

L

E

2015 Egyptian International Motors

Generators

Inland

09/Nov/15

24

21/Oct/15 PO

TPD

L

C

2015 Dash Dash

Residential Appliances

Various

Inland

30/Dec/15

25 05/Nov/15 PO

TPD

L

E

2015 GIS-Global Integrated System

Fire Alarm System

USA

Inland

12/Nov/15

26

13/Oct/15 PO

TPD

L

C

2015 Aldorado

Inland

03/Nov/15

27

15/Oct/15 PO

OPE

F

C

2015

Safet

Bolts and Shear Stud

Germany Sea

20/Oct/15

28

15/Oct/15 PO

OPE

F

C

2015

Safet

Steel Rebar

Italy

Sea

15/Nov/15

29

Italpannelli SRL

Ceramic Tiles

16/Oct/16 PO

TPD

F

C

2015

Sandwich Panel

Italy

Sea

13/Nov/16

30 19/Nov/15 PO

TPD

L

C

2015 Dash Dash

Equipment for the Camp

USA

Inland

03/Dec/15

31

28/Oct/15 PO

TPD

L

E

2015 Cable Net Egypt

MATV System

Various

Inland

09/Dec/15

32 09/Nov/15 PO

OPE

F

C

2015

Bending Machine

Italy

Air

23/Nov/15

33 24/May/17 SC

TPD

L

C

2015 A-Build Egypt for Contracting

Waterproofing and Thermal Insulation

-

24/May/17

34 08/Nov/15 PO

TPD

L

E

2015 Sega-M

LV Panel Boards

Egypt

Inland

08/Dec/15

35 16/Nov/15 PO

TPD

L

C

2015 MOHM

Lockers and Benches

Egypt

Inland

30/Nov/15

36 15/Nov/16 PO

TPD

L

C

2015 Bashayer

Kitchenware

Egypt

Inland

27/Dec/16

37

18/Jan/16 PO

TPD

L

C

2015 Firoz

Residential Appliances

Egypt/ItalyInland

17/Feb/16

38 29/Nov/15 PO

TPD

L

E

2015 3-Brothers

Lighting Fixtures

Egypt

Inland

13/Dec/15

39 29/Nov/15 PO

TPD

L

C

2015 Dash Dash

Kitchenware

Egypt

Inland

10/Jan/16

40

01/Dec/15 PO

TPD

L

C

2015 Medzone

First Aid clinic equipment

China/ItalyInland

30/Jan/16

41

02/Dec/15 PO

TPD

L

C

2015 Medal Egypt

First Aid clinic equipment

Various

01/Mar/16

42

Global Sourcing Company

Inland

01/Aug/16 SC

TPD

L

C

2015 Al-Barakah

Suspended Ceiling

SC

01/Aug/16

43 23/Nov/15 SC

TPD

L

E

2015 Otak Trading & Contracting

Lightning Protection and Bonding System SC

07/Dec/15

44 09/Nov/15 PO

PUR

F

E

2015

Techno Gulf

Cable Terminations and Lugs

Italy

Sea

14/Dec/15

45

10/Jan/16 PO

PUR

F

C

2015

Kimetal SRL (Sigma)

Plates

Italy

Sea

15/Dec/15

46

14/Dec/15 PO

PUR

F

C

2015

Umran Celik Boru Sanayii

Pipes

Turkey

Sea

04/Dec/15

47 24/Nov/15 PO

PUR

F

C

2015

Sideram SRL

Pipes

Italy

Sea

10/Dec/15

48

01/Dec/15 PO

TPD

L

C

2015 Dash Dash

Toilet Accessories

Egypt

Inland

22/Dec/15

49 24/Nov/15 PO

OPE

L

E

2015 Electro Technique

Temporary Site Panels

Egypt

Inland

52

06/Jan/16 PO

TPD

F

C

2016

Polyglass SPA

Waterproof Membrane

Italy

Sea

07/Feb/16

53

19/Jan/16 PO

TPD

F

E

2015

Italian Cable Company

Earthing Cables

Italy

Sea

01/Mar/16

54

07/Dec/15 PO

OPE

F

C

2015

Baltic Control

Steel Rebar Inspection

Italy

-

55

10/Dec/15 PO

TPD

L

E

2015 Grand International

Wiring Devices

Inland

56

20/Jul/17 SC

TPD

L

C

2015 France Metal

Steel Doors

SC

57

10/Dec/15 PO

TPD

L

C

2015 Medzone

Healthcare Furniture

59

13/Dec/15 SC

TPD

L

C

2015 A-Build Egypt for Contracting

Epoxy Flooring

60

16/Dec/15 PO

TPD

F

C

2015

61

20/Dec/15 PO

TPD

L

C

62

15/Dec/15 PO

TPD

L

E

63

15/Dec/15 PO

TPD

L

E

ISEA

UK

Inland

17/Dec/15

17/Dec/15

SC

13/Dec/15

Sea

16/Dec/15

Roll up Doors

Italy

2015 Dash Dash

Residential Appliances

Italy/ChinaInland

2015 Grand International

Wiring Devices

Various

Inland

05/Jan/16

2015 Sega-M

LV Panel Boards

Egypt

Inland

22/Dec/15

27/Dec/15

64

18/Apr/17 PO

TPD

L

E

2015 Dtec

Data communication Network S Egypt

Inland

27/Jun/17

65

11/Jan/16 PO

TPD

L

E

2015 Smart Group

LV Panel Boards

Inland

21/Jan/16

66

25/Dec/15

Egypt

29/Dec/15 PO

PUR

F

C

2015

Kimetal SRL (Sigma)

Steel Sections

Italy

Sea

67 26/Nov/15 PO

PUR

F

C

2015

Sino Alliance

Safety Shoes

China

Sea

05/Jan/16

69

08/Dec/15 PO

PUR

F

E

2015

Economic Electric Company FEMI

Cable Trays

Italy

Sea

02/Feb/16

70

06/Dec/15 PO

PUR

F

C

2015

Tuxor

Steel Sections

Italy

Sea

71

13/Dec/15 PO

PUR

F

C

2015

Kimetal SRL (Sigma)

STG Plates

Italy

Sea

31/Jan/16

72

14/Dec/15 PO

PUR

F

C

2015

Tata International Metals UK

STG Steel Sections

UK

Sea

31/Dec/15

73

20/Dec/15 PO

TPD

L

C

2015 Harmouch

Terazzo Tiles

Egypt

Inland

10/Jan/16

Page 1 of 9


Burullus Combined Cycle Power Project ‐ Purchase Orders Log SN

PO Date

Type

Dept

F/L

E/M/C

Year

Local Supplier

74

17/Dec/15 PO

TPD

F

M

2015

75

28/Aug/16 PO

TPD

L

E

2015 Anzma-Tech

76

25/Feb/16 PO

OPE

F

M

2016

77

29/Dec/15 PO

TPD

L

E

2015 Al Masria for Electrical Industries & Works

79

24/Dec/15 PO

OPE

F

E

2015

80

24/Dec/15 PO

OPE

F

C

81

29/Jun/16 PO

TPD

F

82

21/Jan/16 PO

TPD

F

83

27/Dec/15 PO

TPD

84

22/Dec/15 PO

85

22/Dec/15 PO

86

30/Dec/15 PO

87

20/Dec/15 PO

88

Foreign Supplier

Item Description

Origin

Delivery Date

Air/Sea

GH Italia Cranes and Components

Overhead Cranes for Steam Tu Spain/ItalySea Access Control System & TurnsVarious

Inland

04/Sep/16

BONAR

Vertical Drains

Sea

24/Mar/16

Explosion Proof Wiring Devices Italy

Inland

05/Jan/16

Techno Gulf/Helukabel

Wires

Italy

Sea

28/Jan/16

2015

Global Sourcing Company

Bolts, Washers and Nuts

Italy

Sea

25/Jan/16

E

2015

Disano Illuminazione

Lighting Fixtures

Italy

Air

18/Jan/16

E

2015

SBP Spa a Socio Unico

Lighting Fixtures

Italy

Air

25/Jan/16

F

E

2015

Fosnova Gruppo Disano

Lighting Fixtures

Italy

Air

25/Jan/16

PUR

F

E

2015

Safet

MV Power Cables

Italy

Sea

01/Mar/16

PUR

F

E

2015

Economic Electric Company FEMI

Cable Trays

Italy

Sea

16/Feb/16

TPD

L

E

2015 Elsewedy Electrical Equipment & Cables Company

Lighting Fixtures

Egypt

Inland

10/Feb/16

PUR

F

E

2015

Techno Gulf/Sitie

Fixation Accessories

Italy

Sea

31/Jan/16

22/Dec/15 PO

PUR

F

E

2015

La Tiveneta Cavi

LV Power Cables

Italy

Sea

02/Feb/16

89

29/Dec/15 PO

TPD

L

C

2015 Woodek

Office Furniture

Egypt

Inland

28/Jan/16

90

30/Dec/15 PO

TPD

L

E

2015 Grand International

Wiring Devices

Various

Inland

27/Jan/16

91

31/Dec/15 PO

OPE

L

C

2015 Proactive

Raised Floor & Aluminum SkirtinChina

SC

07/Jan/16

92

31/Dec/15 PO

OPE

L

E

2015 Techno Gulf

CAT 6 Data Cable

Inland

03/Jan/16

93

12/Jan/16 PO

TPD

L

C

2016 Future Office Furniture

Office Furniture

Egypt

Inland

19/Jan/16

94

03/Jan/16 PO

TPD

L

E

2016 GILA (Al Tawakol Electrical Co)

LV Panel Boards

Egypt

Inland

17/Jan/16

Various

EU

Italy

95

19/Apr/16 PO

TPD

L

E

2016 Grand International

Wiring Devices

Inland

17/May/16

97

05/Jan/16 PO

OPE

L

E

2016 Techno Gulf

CAT 6 Data Cable Accessories Italy

Inland

12/Jan/16

98

17/Jan/16 PO

TPD

L

E

2016 Grand International

Wiring Devices

Inland

31/Jan/16

99

05/Jan/16 PO

TPD

L

E

2016 Sega-M

LV Panel Boards

Egypt

Inland

12/Jan/16

100

10/Jan/16 PO

TPD

L

E

2016 Grand International

Wiring Devices

Various

Inland

21/Feb/16

101

11/Jan/16 PO

TPD

L

C

2016 Raytex

Accommodation Blinder TextilesEgypt

Inland

12/Jan/16

102

17/Jan/16 PO

TPD

L

C

2016 Jotun

Epoxy Coatings for Internal steeEgypt

Inland

22/Jan/16

103

12/Jan/16 PO

TPD

L

E

2016 Debbas

Lighting Fixtures

Inland

15/Jan/16

104

08/Feb/16 SC

TPD

L

M

2015 Semco

HVAC System

SC

105

19/Jan/16 PO

TPD

L

E

2016 Cable Net Egypt

MATV - Master Antenna TV SysChina

Inland

106 29/May/16 PO

TPD

L

E

2016 Anzma-Tech

Access Control System & TurnsFrance

Inland

12/Jun/16

107

12/Jan/16 PO

TPD

L

C

2016 Woodek

Office Furniture

Inland

21/Feb/16

108

27/Jun/17 SC

TPD

L

C

2016 Al-Barakah

Suspended Ceiling

Egypt

SC

109

13/Jan/16 PO

OPE

L

E

2016 International Consultant Engineers ICE

Cathodic Protection

Egypt

Inland

110

18/Jan/16 PO

TPD

L

E

2016 Al Masria for Electrical Industries & Works

Lighting Fixtures (Explosion ProItaly

Inland

29/Feb/16

111

21/Jan/16 PO

TPD

L

E

2016 Smart Group

LV Switchgear

Egypt

Inland

11/Feb/16

112

31/Jan/16 PO

TPD

F

E

2016

Fosnova Gruppo Disano

Lighting Fixtures

Italy

Air

113

17/Jan/16 PO

OPE

F

C

2016

Baltic Control

Pipes Inspection

Italy

-

114

08/Feb/17 SC

TPD

L

C

2016 A-Build Egypt for Contracting

Epoxy Flooring

SC

115

27/Apr/16 PO

TPD

L

C

2016 Ramo Hany Maamoun Abd El Hai

Accommodation Blinder TextilesEgypt

Inland

20/Jan/16

116

14/Jan/16 PO

TPD

L

C

2016 Ahmed & Mohamed Lotfy Co.

Glazing and Mirrors

Inland

14/Jan/16

117

17/Jan/16 PO

OPE

L

C

2016 Kir Mary

Grooving Threading Machines

Inland

17/Jan/16

118

28/Jan/16 PO

TPD

L

C

2016 Dash Dash

Commercial Appliances for the Various

Inland

11/Feb/16

119

28/Jan/16 PO

TPD

L

C

2016 Contrade Egypt

Commercial Appliances for the Various

Inland

18/Feb/16

120

18/Jan/16 PO

PUR

F

C

2016

Umran Celik Boru Sanayii

Pipes

Sea

22/Feb/16

121

02/Mar/16 PO

TPD

F

E

2016

Performance In Lighting SPA

Lighting Fixtures (Control Buildi Italy

Air

28/Jan/16

122

17/Feb/16 PO

TPD

F

E

2016

Performance In Lighting SPA

Lighting Fixtures (GIS Building) Italy

Air

28/Jan/16

123

19/Jan/16 PO

TPD

L

E

2016 Egyptian International Motors

Generators

Egypt

Inland

16/Feb/16

124

21/Jan/16 PO

TPD

L

E

2016 Petrokima

LV Switchgear

Egypt

Inland

31/Mar/16

125

21/Jan/16 PO

TPD

L

E

2016 Sega-M

LV Switchgear

Egypt

Inland

28/Jan/16

126

21/Jan/16 PO

PUR

F

C

2016

Tuxor

Steel Beams and Plates

Italy

Sea

10/Feb/16

127

21/Jan/16 PO

PUR

F

M

2016

Saint Gobain PAM

128

21/Jan/16 PO

PUR

F

M

2016

Safet

01/Mar/16

129

28/Jan/16 PO

TPD

F

M

2016

Total Walther GmbH

Cast Iron Pipes and Couplings France Air Carbon Steel Teardrop Plates, Pipes, Elbows & Flat Bars Italy Sea Fire Fighting and Detection System for GIS & Control Germany Sea

24/Mar/16

130

27/Jan/16 PO

TPD

L

E

2016 Grand International

Isolating Switches

03/Feb/16

131

23/Feb/16 PO

TPD

F

M

2016

Climaveneta-SEMCO

Package Units

Italy

Sea

26/Apr/16

132

09/Mar/16 PO

TPD

F

E

2016

SBP Spa a Socio Unico

Lighting Fixtures

Italy

Sea

17/Mar/16

133

27/Jan/16 PO

OPE

F

E

2016

Safet

LV Cables

Italy

Sea

04/Feb/16

134

28/Jan/16 PO

TPD

L

C

2016 Ceramica Cleopatra

Ceramic Tiles

Egypt

Inland

04/Feb/16

135

17/Feb/16 PO

TPD

L

C

2016 Ceramica Cleopatra

Ceramic Tiles

Egypt

Inland

24/Feb/16

136

08/Feb/16 PO

TPD

L

E

2016 Al Masria for Electrical Industries & Works

Explosion Proof Wiring Devices Italy

Inland

21/Mar/16

137

21/Jan/16 PO

TPD

F

E

2016

Lighting Fixtures (Control Buildi Italy

Sea

25/Feb/16

138

31/Jan/16 PO

TPD

L

E

2016 Sega-M

LV Panel Boards

Egypt

Inland

07/Feb/16

139

31/Jan/16 PO

TPD

L

C

2016 Mohm

Lockers for the Camp

Egypt

Inland

21/Feb/16

140

03/Feb/16 PO

TPD

L

E

2016 Grand International

Wiring Devices

France

Inland

10/Feb/16

141

31/Dec/15 PO

PUR

F

C

2015

Cast Iron Pipes & Couplings

Italy

Sea

18/Jan/16

142

03/Feb/16 PO

TPD

L

C

2016 Unilex Sign Systems

Signage for camp

Egypt

Inland

08/Feb/16

Disano Illuminazione

Sideram SRL

Italy

Egypt

Egypt

Turkey

France

Inland

143

01/Feb/16 PO

PUR

F

E

2016

Techno Gulf/Cembre

Power Blocks Auxiliary ErectionItaly

Sea

144

01/Feb/16 PO

PUR

F

C

2016

Safet

Carbon Steel Teardrop Plates &Italy

Sea

Page 2 of 9

26/Jan/16

10/Feb/16

25/Jan/16 08/Feb/17

31/Jan/16

28/Mar/16 15-Feb 15-30-Mar


Burullus Combined Cycle Power Project ‐ Purchase Orders Log Type

Dept

F/L

E/M/C

Year

Local Supplier

Foreign Supplier

Item Description

Origin

Delivery Date

SN

PO Date

145

03/Feb/16 PO

PUR

F

E

2016

Safet

Cable Terminations and Joints Italy

Air

24/Feb/16

146

02/Feb/16 PO

PUR

F

C

2016

Tuxor

Steel Beams and Plates GCB

Italy

Sea

20/Feb/16

147

04/Feb/16 PO

OPE

F

M

2016

Seven Seas s.a.s - Astico

Fire Fighting System

USA/Pola Sea

14/Apr/16

148

15/Mar/16 SC

TPD

L

C

2016 Xervon Egypt

149

30/Jul/17 PO

TPD

F

C

2017

Protecta

Epoxy Coating

USA/UAE Inland

10/Sep/17

150

10/Mar/16 PO

TPD

F

E

2016

Italian Cable Company

Earthing Cables

Italy

Sea

16/Mar/16

151

07/Feb/16 PO

TPD

L

E

2016 Sega-M

LV Panel Boards

Egypt

Inland

14/Feb/16

152

20/Mar/17 SC

TPD

L

M

2016 Misr for Engineering Works

Cranes

153

08/Feb/16 PO

OPE

L

M

2016 International Consultant Engineers ICE

Cathodic Protection

Egypt

Inland

22/Feb/16

154

28/Feb/16 SC

TPD

L

M

2016 AlEtribi

Cranes

Egypt

SC

22/May/16

155

09/Feb/16 PO

OPE

F

E

2016

I & C Cables

Germany Sea

156

11/Feb/16 PO

TPD

L

E

2016 Dtec

158

11/Feb/16 PO

OPE

L

C

2016 Arcosteel

Steel Round Bars

Egypt

Inland

159

11/Feb/16 PO

PUR

F

E

2016

Safet

MV Power Cables

Italy

Sea

21/Apr/16

160

11/Feb/16 PO

PUR

F

C

2016

Kimetal SRL (Sigma)

Steel Beams and Plates

Italy

Sea

10/Apr/16

161

16/Feb/16 PO

TPD

L

E

2016 Delta Egypt Lighting

Lighting Fixtures

Egypt

Inland

12/Apr/16

162

16/Feb/16 PO

TPD

F

E

2016

Safet

Lighting Fixtures

Italy

Sea

22/Mar/16

164

15/Feb/16 PO

OPE

L

M

2016 International Consultant Engineers ICE

Cathodic Protection

Egypt

Inland

165

25/Feb/16 PO

TPD

L

E

2016 Digital Company

Audio Visual System

Egypt

Inland

166

06/Apr/16 SC

TPD

L

M

2016 Metito

Water Treatment System

Egypt

SC

167

17/Feb/16 PO

OPE

F

M

2016

Hydraulic Test Pump

USA

Air

16/Mar/16

168

06/Mar/16 PO

TPD

L

E

2016 Grand International

Wiring Devices

France

Inland

15/May/16

169

28/Feb/16 PO

TPD

F

M

2016

Climaveneta-SEMCO

Package Units

Italy

Sea

01/May/16

170

22/Feb/16 PO

OPE

F

E

2016

Italian Cable Company

UMB Power Cables

Italy

Sea

28/Mar/16

171

23/Feb/16 PO

OPE

F

C

2016

GBC Industrial Tools SPA

Pipe Cutting & Beveling Machin Italy

Sea

172

01/Mar/16 PO

TPD

L

E

2016 Anzma-Tech

174

28/Feb/16 PO

OPE

F

M

2016

175

04/Apr/16 PO

TPD

L

E

2016 Elsewedy Electrical Equipment & Cables Company

Epoxy Flooring

Seven Seas s.a.s

SC

Data communication Network S Egypt

STI Servizi Tecnici Industrial srl - Pevtco

Access Control System Ital Trade Services

Air/Sea

26/Apr/16

Inland

18/Feb/16

03/Mar/16

14/Mar/16

USA/EgypInland

08/Mar/16

Butt Fusion Machine for HDPE Italy

Sea

10/Apr/16

Lighting Fixtures

Egypt

Inland

03/Jun/16

Compressors Accessories, PipinEgypt

Inland

03/Aug/16

176

02/Mar/16 PO

TPD

L

M

2016 Atlas Copco Equipment Egypt

178

28/Feb/16 PO

PUR

F

E

2016

Safet

Cable Terminations and AccessGermany/ Sea

179

28/Feb/16 PO

PUR

F

C

2016

Umran Celik Boru Sanayii

Pipes

Turkey

Sea

23/Apr/16

180

02/Mar/16 PO

OPE

F

E

2016

Global Sourcing Company

Cable Support System

Italy

Sea

11/May/16

182

06/Mar/16 PO

TPD

L

E

2016 Grand International

Wiring Devices

France

Inland

03/Apr/16

183

09/Mar/16 PO

TPD

L

E

2016 Elsewedy Electrical Equipment & Cables Company

Lighting Fixtures

Egypt

Inland

13/Apr/16

185

03/Mar/16 PO

TPD

L

E

2016 Global Integrated Systems (GIS)

Fire Alarm System

Egypt

Inland

10/Mar/16

186

14/Mar/16 SC

TPD

L

M

2016 New Matco

HVAC System

187

08/Mar/16 PO

TPD

L

E

2016 Dtec

188

03/Mar/16 PO

PUR

F

C

2016

189

12/Apr/16 SC

TPD

L

C

2016 A-Build Egypt for Contracting

191

08/Mar/16 PO

TPD

L

E

2016 Global Integrated Systems (GIS)

192

09/Mar/16 PO

TPD

F

E

2016

193

09/Mar/16 PO

TPD

L

C

2016 Jotun

194

09/Mar/16 PO

TPD

F

E

2016

195

10/Mar/16 PO

TPD

L

E

2016 Grand International

196

10/Mar/16 PO

TPD

L

C

197

11/Jan/17 SC

TPD

L

198

23/Mar/16 PO

TPD

201

10/Mar/16 PO

PG

202

14/Mar/16 PO

TPD

CTA-Commerciale Tubi Acciaio

EMA Company

27/Mar/16

SC

Data communication Network S Egypt

Inland

15/Mar/16

Pipes and Fittings

Italy

Sea

21/Apr/16

Epoxy Coatings

Egypt

SC

Fire Alarm System

Egypt

15/Mar/16

Low Voltage Switchgear & Med Italy

Sea

06/Apr/16

Epoxy Coatings for external ste Egypt

Inland

14/Mar/16

Low Voltage Switchgear & Med Italy

Sea

04/May/16

Wiring Devices (Power Sockets France

Inland

05/May/16

2016 Ceramica Cleopatra

Ceramic Tiles

Egypt

Inland

13/Mar/16

C

2016 Golden Marble

Marble & Granite

Egypt

SC

F

E

2016

Italian Lighting/Linergy

Lighting Fixtures

Italy

Sea

F

M

2016

ETEA Sicurezza

Fire Protection Systems and EqItaly

Sea

05/May/16

L

E

2016 Grand International

Wiring Devices

Inland

09/May/16

EMA Company

France

04/May/16

203 15/May/16 PO

TPD

L

C

2016 Ramo Hany Maamoun Abd El Hai

Accommodation Blinder TextilesEgypt

Inland

15/May/16

205

15/Mar/16 PO

TPD

L

E

2016 Dtec

Data communication Network S Egypt

Inland

10/May/16

209

15/Mar/16 PO

OPE

F

E

2016

Global Sourcing Company

Control Cable

Italy

Sea

22/Mar/16

210

17/Mar/16 PO

OPE

F

E

2016

Italian Cable Company

LV Cables

Italy

Sea

07/Apr/16

211

20/Mar/16 PO

TPD

F

E

2016

BORRI SPA

Balance of Plant UPS System Italy

Sea

26/Jun/16

212

22/Mar/16 PO

TPD

L

E

2016 Modernlite Technology

Dimming System

China

Inland

17/May/16

215

31/Mar/16 PO

TPD

L

E

2016 Dtec

Data communication Network S Egypt

Inland

23/Jun/16

216

05/Apr/16 PO

TPD

L

C

2016 Ceramica Cleopatra

Ceramic Tiles

Egypt

Inland

218

31/Mar/16 PO

OPE

F

C

2016

Pipes Inspection

Italy

-

219

06/Apr/16 PO

TPD

L

C

2016 Ceramica Cleopatra

Ceramic Tiles

Egypt

Inland

220

04/Apr/16 PO

TPD

L

C

2016 Ceramica Cleopatra

Ceramic Tiles

Egypt

Inland

11/Apr/16

221

29/Mar/16 PO

PUR

F

C

2016

Steel Plates and Profiles

Italy

Sea

20/Apr/16

222

10/Apr/16 PO

TPD

L

C

2016 Dash Dash

Linen and Textiles

Egypt

Inland

24/Apr/16

223

12/Apr/16 PO

TPD

L

C

2016 Future Office Furniture

Office Furniture

Egypt

Inland

27/Apr/16

225

10/Apr/16 PO

TPD

L

C

2016 Harmouch

Terazzo Tiles

Egypt

Inland

01/May/16

226

18/Apr/16 PO

TPD

L

E

2016 Dtec

Data communication Network S Egypt

Inland

27/Jun/16

227

11/Apr/16 PO

TPD

L

E

2016 Grand International

Wiring Devices

France

Inland

20/Jun/16

228

07/Apr/16 PO

OPE

F

M

2016

Heat Treatment Equipment

UK

Sea

19/May/16

229

10/Apr/16 PO

OPE

L

C

2016 Proactive

Raised Floor Tiles

China

Inland

17/Apr/16

230

10/Apr/16 PO

OPE

L

C

2016 Proactive

Raised Floor Aluminum Skirting for CentraInland

17/Apr/16

Baltic Control

Safet

Stork Technical Services (RBG)

Page 3 of 9

05/Apr/16 13/Apr/16


Burullus Combined Cycle Power Project ‐ Purchase Orders Log SN

PO Date

Type

Dept

F/L

E/M/C

Year

Local Supplier

231

14/Apr/16 PO

TPD

L

E

2016 Grand International

232

06/Apr/16 PO

OPE

F

M

2016

233

17/Apr/16 PO

TPD

L

C

2016 Liveart

234

08/Sep/16 PO

TPD

F

E

2016

235

08/Jun/16 PO

TPD

L

C

2016 ElAraby Company for Engineering Industries

236

09/Jun/16 PO

TPD

L

C

2016 ALASKA

237

19/Oct/16 PO

TPD

F

M

2016

Foreign Supplier

Ital Trade Services

SIELTE SPA

Safetec

Item Description

Origin

Air/Sea

Delivery Date

Wiring Devices Special Accessories for Butt Fusion Machine for HDPE

France

Inland

Italy

Air

23/Jun/16 27/Apr/16

Metal Security Safe Box

Egypt

Inland

22/Apr/16

Paging System

Germany Sea

06/Jan/17

Televisions

Egypt

Inland

23/Jun/16

Inland

Residential Appliances

Egypt

Safety Shower

Sweden Sea

21/Nov/16

09/Jul/16

239 08/May/16 PO

TPD

L

C

2016 Liveart

Residential Furniture

Egypt

Inland

12/May/16

240

20/Apr/16 PO

TPD

L

C

2016 Dash Dash

Commercial Appliances for the Egypt

Inland

04/May/16

241

20/Apr/16 PO

TPD

L

E

2016 United Systems

Data communication Network S Egypt

Inland

27/Apr/16

242

17/Apr/16 PO

OPE

L

M

2016 International Consultant Engineers ICE

Service Water Tank Cathodic P Egypt

Inland

29/May/16

243

21/Apr/16 PO

OPE

L

E

2016 Electro Mechanical Engineering Company

Cable Trays Supporting DevicesEgypt

Inland

16/Jun/16

244

17/Apr/16 PO

PUR

F

M

2016

Sideram SRL

Cast Iron Pipes and Fittings

Italy

Sea

20/May/16

245

02/Jun/16 PO

PUR

F

M

2016

CUNADO

Pipes and Fittings

Italy

Sea

09/Jun/16

246

20/Apr/16 PO

PUR

F

M

2016

EUROTUBI

Pipes and Fittings

Italy

Sea

27/Apr/16

247

12/Jun/16 SC

TPD

L

C

2016 Alco

Aluminum Works

Egypt

248

27/Apr/16 PO

TPD

L

C

2016 Dash Dash

Commercial Appliances for the Egypt

Inland

249

26/Apr/16 PO

TPD

L

E

2016 Dtec

Data communication Network S Egypt

Inland

05/Jul/16

250

26/Apr/16 PO

TPD

L

E

2016 Tech Link

Data communication Network S Egypt

Inland

26/Apr/16

251 22/May/16 PO

TPD

L

E

2016 Tech Link

252 05/May/16 PO

PUR

F

M

2016

11/May/16

Data communication Network S Egypt

Inland

29/May/16

Sideram SRL

Pipes and Fittings

Italy

Sea

21/May/16 05/May/16

254 05/May/16 PO

PUR

F

E

2016

Techno Gulf/Helukabel

Conduits and Fittings

Italy

Inland

255

25/Apr/16 PO

PUR

F

E

2016

TK-Kabel

Cables

italy

Sea

25/Jul/16

256 16/May/16 PO

TPD

L

E

2016 Grand International

Wiring Devices

France

Inland

25/Jul/16

257 15/May/16 PO

OPE

L

E

2016 Electro Mechanical Engineering Company

Cable Trays Supporting DevicesEgypt

Inland

10/Jul/16

258 15/May/16 PO

OPE

L

E

2016 Power Solutions

Cable Trays Supporting DevicesEgypt

Inland

10/Jul/16

259 16/May/16 PO

TPD

L

E

2016 Sega-M

LV Panel Boards

Egypt

Inland

30/May/16

260

22/Jun/16

05/Jun/16 PO

OPE

F

E

2016

LV Cables

Italy

Sea

261 18/May/16 PO

TPD

L

E

2016 3-Brothers

Italian Cable Company

Lighting Fixtures

Egypt

Inland

08/Jun/16

262 23/May/16 PO

TPD

L

C

2016 Woodek

Office Furniture

Egypt

Inland

30/May/16

263 23/May/16 PO

TPD

L

C

2016 Dash Dash

Residential Appliances

Egypt

Inland

06/Jun/16

264

08/Jun/16 PO

TPD

L

C

2016 ElAraby Company for Engineering Industries

Refrigerator

Egypt

Inland

23/Jun/16

265 23/May/16 PO

TPD

L

E

2016 3-Brothers

Lighting Fixtures

Egypt

Inland

06/Jun/16

266 31/May/16 PO

TPD

L

C

2016 Dash Dash

Redidential Appliances

Various

Inland

31/May/16

267 29/May/16 PO

TPD

L

E

2016 ElSewedy (EGYLUX)

Lighting Fixtures

Egypt

Inland

12/Jun/16

268 29/May/16 PO

TPD

L

E

2016 ElSewedy (EGYPLAST)

Lighting Fixtures

Egypt

Inland

12/Jun/16

269

19/Jul/17 SC

TPD

L

C

2016 Xervon Egypt

Epoxy Coatings

Egypt

SC

270

Air Handling Units

Italy

Sea

01/Jun/16 PO

TPD

F

M

2016

271 22/May/16 PO

OPE

L

E

2016 Global Integrated Systems (GIS)

Weger Walter GmbH

272 22/May/16 PO

OPE

F

M

2016

273 29/May/16 PO

TPD

L

E

2016 Sega-M

274

01/Jun/16 PO

TPD

F

E

2016

Italian Lighting/Tecmar

275

05/Sep/16 PO

TPD

F

E

2016

276

02/Aug/16 PO

TPD

F

E

2016

277

01/Jun/16 PO

TPD

F

E

278

21/Feb/17 PO

TPD

F

C

279

01/Jun/16 PO

TPD

F

C

2016

280

09/Jun/16 PO

TPD

L

C

2016 Jotun

Epoxy Coating for External SteeEgypt

281 06/Nov/16 PO

TPD

L

E

2016 Cable Net Egypt

MATV System

Fire Resistant Cables Hamon Thermal Europe

27/Jul/16

Inland

29/May/16 12/Jun/16

Gluing Machines

EU

Sea

LV Panel Boards

Egypt

Inland

05/Jun/16

Lighting Fixtures (Gas Turbines Italy

Sea

15/May/16

Fael Luce/Delta Egypt Foreign Trading

Lighting Fixtures (Gas Turbines Italy

Sea

20/Sep/16

Fael Luce/Delta Egypt Foreign Trading

Lighting Fixtures

Italy

Sea

05/May/16

2016

Italian Lighting/Tecmar

Lighting Fixtures (Gas Turbines Italy

Sea

27/Jul/16

2016

ISEA

Roll up Doors

Italy

Sea

15/Jun/16

ISEA

Roll up Doors

Italy

Sea

15/Jun/16

Inland

14/Jun/16

Denmark/ Inland

06/Nov/16

282

03/Oct/16 PO

TPD

F

E

2016

Clampco Sistemi

Obstructions Lights

Italy

Sea

10/Oct/16

283

05/Jun/16 PO

TPD

F

E

2016

FGM Electrical Service

CCTV - Closed Camera TV

Italy

Sea

10/Jul/16

285

06/Apr/17 PO

TPD

F

M

2016

Emit Metito

Water and Waste Water TreatmEurope

Sea

287

02/Jun/16 PO

TPD

F

M

2016

Atlas Copco Italia

Packaged Air Compressor

Europe

Sea

16/Aug/16

288

27/Jun/16 PO

TPD

F

E

2016

Tesylab Company

Master Clock System

Italy

Sea

18/Jul/16

289

03/Jul/16 PO

TPD

F

E

2016

Benning Conversion Di Energia

Balance of Plant UPS System France/GeSea

20/Jul/16

290

06/Jun/16 PO

TPD

F

E

2016

Tesylab Company

Pabx

USA

06/Jul/16

291

28/Jul/16 PO

TPD

L

C

2016 Modern Design

Blinds

Egypt

292

26/Mar/17 PO

TPD

F

E

2016

ALFAQUADRI Company

Low Voltage Switchgear & Med Italy

Sea

16/Apr/17

293 30/May/16 PO

PUR

F

M

2016

ELETTROCANALI

PVC Condiuts and Fittings

Sea

06/Jun/16

294

02/Jun/16 PO

PUR

F

M

2016

Sideram SRL

Cast Iron Pipes and Fittings

EU

Sea

09/Jun/16

295

05/Jun/16 PO

PUR

F

E

2016

Seven Seas-Helukabel

Telephone Cables

EU

Sea

07/Aug/16

ISEA

Roll up Doors

Italy

Sea

08/Nov/16

Kitchenware

Egypt

Inland

Sandwich Panel

Italy

Sea

Italy

Air Inland

11/Aug/16

296

04/Oct/16 PO

TPD

F

C

2016

297

15/Jun/16 PO

TPD

L

C

2016 Dash Dash

298

02/Jun/16 PO

TPD

F

C

2016

299

13/Jul/16 PO

OPE

F

M

2016

Lincoln Electric Italia

Welding Electrodes

italy

Sea

24/Jul/16

300

31/Mar/16 PO

OPE

F

C

2016

Global Sourcing Company

Bolts, Washers and Nuts

Italy

Sea

25/Apr/16

301

20/Jun/16 PO

TPD

L

C

2016 Dash Dash

Linen and Textiles

Egypt

Inland

11/Jul/16

302

19/Jun/16 PO

TPD

L

C

2016 Dash Dash

Linen and Textiles

Egypt

Inland

10/Jul/16

303

26/Jun/16 PO

TPD

L

C

2016 Liveart

Residential Furniture

Egypt

Inland

21/Jul/16

Italpannelli SRL

Page 4 of 9

06/Jul/16 30/Jun/16


Burullus Combined Cycle Power Project ‐ Purchase Orders Log SN

PO Date

Type

Dept

F/L

E/M/C

Year

Local Supplier

Foreign Supplier

Item Description

Origin

Air/Sea

304 28/Nov/16 PO

TPD

L

E

2016 Integrity and Corrosion Experts

305

20/Oct/16 PO

PG

F

M

2016

306

28/Jul/16 PO

TPD

L

C

2016 Modern Design

307

24/Jul/16 PO

TPD

F

E

2016

Kone Italy

Elevators

308

14/Mar/16 PO

OPE

F

M

2016

Global Sourcing Company

HDPE Pipes and Fittings

309

12/Jun/16 PO

OPE

F

M

2016

Seven Seas

Water Tank Level Indicators

310

19/Jun/16 PO

OPE

F

M

2016

WIKA

Pressure Gauge

Germany Air

311

03/Jul/16 PO

OPE

F

M

2016

Global Sourcing Company

CO2 Breather

Finland

312

26/Jun/16 PO

TPD

F

M

2016

RE.CO.MA

Gas Storage Cylinders

Austria/ItaSea

30/Sep/16

313

26/Jun/16 PO

TPD

F

E

2016

ALFAQUADRI Company

LV Switchgear

Italy

25/Aug/16

314

14/Jul/16 PO

TPD

F

E

2016

ENDRESS + HAUSER

Control Valves

Germany Air

315

04/Jul/16 PO

TPD

F

M

2016

Pompe Garbarino

Horizontal Centrifugal Water PuItaly

Sea

25/Sep/16

316

03/Jul/16 PO

TPD

F

E

2016

Parcol International

Control Valves

Air

15/Sep/16

317

11/Jul/16 PO

TPD

L

C

2016 Jotun

Epoxy Coating for External SteeEgypt

Inland

16/Jul/16

318

25/Jul/16 PO

TPD

F

M

2016

Italian Petrochemical Manufacturers

Hydrogen Generating System

Sea/Air

06/Feb/17

319

03/Jul/16 PO

OPE

F

M

2016

Seven Seas

Fire Valves

320

03/Jul/16 PO

OPE

F

M

2016

Global Sourcing Company

Drain Valves

321

04/Oct/16 PO

OPE

F

M

2016

WIDOS

HDPE Welding Machine

322

03/Jul/16 PO

OPE

F

M

2016

ETEA Sicurezza

Fire Extinguishers for Power BloItaly

Sea

11/Sep/16

323

04/Jul/16 PO

PUR

F

M

2016

Sideram SRL

Pipes and Fittings

Italy

Sea

20/Jul/16

324

23/Jun/16 PO

PUR

F

E

2016

Sideram SRL

Earth Bars

Italy

Air

03/Jul/16

325

11/Jul/16 PO

PUR

F

E

2016

Tratos CAVI

Permanent Fence Cables

Italy

Sea

26/Sep/16

326

11/Jul/16 PO

PUR

F

E

2016

Italian Cable Company

STG Cables

Italy

Sea

01/Aug/16

327

14/Jul/16 PO

TPD

L

E

2016 Grand International

Wiring Devices

France

Inland

25/Aug/16

328

05/Oct/16 PO

TPD

F

C

2016

Sandwich Panel

Italy

Delivered X

329

27/Jul/16 PO

TPD

F

M

2016

Seven Seas

Submersible Pumps

Italy

Sea

28/Sep/16

330

12/Jul/16 PO

PUR

F

E

2016

TK-Kabel

I&C Cables

Italy

Sea

23/Aug/16

331

13/Jul/16 PO

PUR

F

M

2016

EUROTUBI

Pipes and Fittings

Italy

Sea

20/Jul/16

332

14/Jul/16 PO

PUR

F

C

2016

Tuxor

Steel Beams and Plates

Italy

Sea

24/Jul/16

333

18/Jul/16 PO

OPE

F

C

2016

Global Sourcing Company

Bolts, Washers and Nuts

KSA

Sea

15/Aug/16

334

19/Jul/16 PO

TPD

F

E

2016

Italian Lighting/Tecmar

Lighting Fixtures

Italy

Sea

23/Aug/16

335

08/Sep/16 SC

TPD

L

E

2016 Kone Egypt

336

27/Jul/16 PO

TPD

F

E

2016

337

28/Jul/16 PO

TPD

L

C

2016 Future Office Furniture

338

28/Jul/16 PO

OPE

F

M

2016

339

28/Dec/16 PO

TPD

F

E

2016

340

04/Jul/16 PO

PUR

F

C

2016

341

31/Jul/16 PO

OPE

F

M

2016

Ital Trade Services

342

30/Jul/16 PO

OPE

F

M

2016

343

27/Jul/16 PO

PUR

F

E

2016

344

27/Jul/16 PO

PUR

F

M

2016

345

28/Jul/16 PO

PUR

F

M

2016

SANCO

Cathodic Protection

Weatern EInland

Cotainerized Fire Pump

italy

Delivery Date

Accommodation Blinder TextilesEgypt

Italpannelli SRL

05/Dec/16 31/Jul/16

Inland

18/Aug/16

Italy

Sea

06/Dec/16

UAE

Sea

30/Mar/16

Air

26/Jun/16

Italy

Air

Sea

31/Jul/16 13/Sep/16

23/Aug/16

Poland/DeSea

31/Jul/16

Sea

07/Aug/16

Germany Sea

09/Nov/16

Elevators Works Tesylab Company

Sea

SC

Pabx

USA

Air

Office Furniture

Egypt

Inland

12/Aug/16

Butt Fusion Machine for HDPE Italy

Sea

21/Aug/16

EMA Company

Low Voltage Switchgear & Med Italy

Sea

25/Sep/16

Tata International Metals UK

Spirally Welded SAW Steel PipeTurkey

Sea

31/Jul/16

Special Reductions PT200

Italy

Air

07/Aug/16

Global Sourcing Company

Bending Machine

Italy

Air

05/Aug/16

Italian Cable Company

Sea

07/Sep/16

CTA-Commerciale Tubi Acciaio

LV Wires Italy Female Hose Connection with Hose Adaptors Italy

Air

10/Aug/16

EUROTUBI

Pipes and Fittings

Sea

11/Aug/16

Ital Trade Services

Italy

26/Aug/16

346

26/Sep/16 PO

TPD

L

E

2016 Anzma-Tech

347

04/Jul/16 PO

PUR

F

C

2016

Tata International Metals UK

Spirally Welded SAW Steel PipeTurkey

Sea

31/Jul/16

348

05/Oct/16 PO

TPD

F

C

2016

Italpannelli SRL

Sandwich Panel

Italy

Sea

12/Oct/16

349

07/Sep/16 PO

OPE

F

M

2016

ETV-European Technology Valves

Fuel Gas Valve

Italy

Air

22/Sep/16

350

01/Aug/16 PO

PUR

F

M

2016

Sideram SRL

Pipes and Fittings

Italy

Sea

29/Aug/16

351

11/Aug/16 PO

OPE

F

M

2016

Global Sourcing Company

HDPE SDR9 (14 bar) FM 200 FItaly

Sea

15/Sep/16

352

11/Oct/16 PO

TPD

L

E

2016 Universe

Data Network Accessories

Egypt

Inland

18/Oct/16

353

08/Sep/16 PO

TPD

L

C

2016 Future Office Furniture

Office Furniture

Egypt

Inland

15/Sep/16

354

14/Aug/16 PO

OPE

L

E

2016 Al Bashayer Foundation Co

Communications Voice TelephoEgypt

Inland

14/Aug/16

355

12/Aug/16 PO

OPE

F

M

2016

Tuxor

Special Supports for Fuel Gas SUSA

Air

09/Sep/16

356

12/Aug/16 PO

OPE

F

M

2016

CVB Valves/Parcol

Valves

Italy

Air

27/Sep/16

357

18/Aug/16 PO

TPD

F

E

2016

WIKA

Pressure Gauges

Italy

358

21/Aug/16 PO

TPD

L

E

2016 Dtec

359

21/Aug/16 PO

TPD

F

M

2016

360

11/Aug/16 PO

PUR

F

M

2016

361

30/Aug/16 PO

TPD

L

E

2016 Grand International

362

01/Sep/16 PO

TPD

F

E

2016

363

01/Sep/16 PO

TPD

F

E

2016

ENDRESS + HAUSER

364

08/Sep/16 PO

TPD

F

E

2016

Italian Lighting/Linergy

365

07/Sep/16 PO

OPE

F

M

2016

GEF SALES-PEVTCO

366

29/Aug/16 PO

OPE

F

M

2016

367

01/Sep/16 PO

OPE

F

M

2016

368

07/Sep/16 PO

OPE

F

M

2016

369

07/Sep/16 PO

OPE

F

M

2016

Seven Seas

Globe Valves for Air Trap

370

06/Sep/16 PO

PUR

F

M

2016

Sideram SRL

Pipes and Fittings

371

06/Sep/16 PO

PUR

F

C

2016

Tuxor

Steel Beams

372

06/Sep/16 PO

PUR

F

E

2016

ELETTROCANALI

PVC Condiuts and Fittings

Access Control System & TurnsMalaysia Inland

24/Oct/16

Air

29/Sep/16

Data communication Network S Egypt

Inland

28/Aug/16

Greenheck Fan Corporation

Gravity Roof Ventilators

USA

Sea

16/Oct/16

Seven Seas

Hose Connections

Italy

Air

01/Sep/16

Wiring Devices

France

Inland

ENDRESS + HAUSER

Radar Level Transmitter

Germany Air

10/Nov/16

Pressure Transmitter

USA/GermAir

10/Nov/16

Lighting Fixtures

Italy

Sea

13/Oct/16

Fuel Gas Check/Ball Valve

Italy

Air

14/Sep/16

CVB Valves/Parcol

Valves

Italy

Air

16/Oct/16

Tuxor

Special Supports for Fire FightinItaly

Air

06/Oct/16

Seven Seas

Strainers

Sea

12/Oct/16

Italy

Air

21/Sep/16

Italy

Sea

04/Oct/16

Italy

Sea

13/Sep/16

Italy

Sea

13/Sep/16

Page 5 of 9

Italy

25/Oct/16


Burullus Combined Cycle Power Project ‐ Purchase Orders Log Type

Dept

F/L

E/M/C

Year

Local Supplier

Foreign Supplier

Item Description

Origin

Air/Sea

Delivery Date

SN

PO Date

373

08/Sep/16 PO

PUR

F

C

2016

Tuxor

Steel Plates

Italy

Sea

374

08/Sep/16 PO

OPE

F

M

2016

Global Sourcing Company

Cast Iron for Plumbing Works

Italy

Sea

06/Oct/16

375

08/Sep/16 PO

PUR

F

E

2016

La Tiveneta Cavi

LV Wires and Cables

Italy

Sea

03/Nov/16

15/Sep/16

376

15/Sep/16 PO

TPD

F

M

2016

Seven Seas

Sanitary Sewage Lift Station EqItaly

Sea

10/Oct/16

377

27/Sep/16 PO

TPD

F

C

2016

Polyglass SPA

Waterproof Membrane

Italy

Sea

05/Nov/16

378 10/Nov/16 PO

TPD

L

E

2016 Cairo Industrial & Petroleum Services

Instrument Tubing

Egypt

Inland

17/Nov/16

379

29/Sep/16 PO

TPD

L

E

2016 ANNCO

Low Voltage

France

Inland

10/Nov/16

380

20/Sep/16 PO

PUR

F

E

2016

Economic Electric Company FEMI

Cable Trays and Accessories

Italy

Sea

25/Oct/16

381

19/Sep/16 PO

OPE

F

M

2016

GEF SALES-PEVTCO

Siemens Valves

Italy

Sea

26/Sep/16

382

26/Sep/16 PO

TPD

L

E

2016 Grand International

Wiring Devices

France

Inland

29/Nov/16

383

27/Sep/16 PO

TPD

L

C

2016 Dash Dash

Linen and Textiles

Egypt

Inland

07/Oct/16

384

26/Sep/16 PO

TPD

F

E

2016

ALFAQUADRI Company

LV Switchgear

Italy

Sea

10/Dec/16

385

26/Dec/16 PO

TPD

F

M

2016

Tarnos Filtracion

Traveling Water Screens & Accessories

Sea

24/Jul/17

386

19/Oct/16 PO

TPD

F

M

2016

TMP-Termomeccanica Pompe

Vertical Turbine Pumps

Italy

Sea

23/Dec/16

387

04/Oct/16 PO

TPD

L

C

2016 Ceramica Cleopatra

Ceramic Tiles

Egypt

Inland

07/Oct/16

388

04/Oct/16 PO

TPD

L

C

2016 Ceramica Cleopatra Fancy

Ceramic Tiles

Egypt

Inland

389

04/Oct/16 PO

TPD

F

M

2016

Total Walther GmbH

Fire Fighting System

Germany Air

390

04/Oct/16 PO

TPD

L

E

2016 3-Brothers

Lighting Fixtures

Egypt

Inland

18/Oct/16

391

03/Oct/16 PO

PUR

F

M

2016

IRC

Carbon Steel Elbow

Italy

Air

03/Oct/16

392

03/Oct/16 PO

PUR

F

M

2016

Global Sourcing Company

Pipes and Fittings

393

04/Oct/16 PO

TPD

L

C

2016 Dash Dash

394

05/Oct/16 SC

TPD

L

E

2016 Advanced Technologies

396

20/Oct/16 PO

PUR

F

C

2016

397

10/Oct/16 PO

TPD

L

E

2016 Advanced Technologies

398

10/Oct/16 PO

TPD

L

E

2016 Advanced Technologies

400

29/Sep/16 SC

PG

F

M

2016

401

20/Sep/16 SC

PG

F

M

2016

403

30/Oct/16 PO

TPD

L

E

2016 Universe

404

28/Oct/16 PO

OPE

F

M

2016

CVB Valves/Parcol

Valves

Italy

Air

23/Dec/16

405

12/Oct/16 PO

PUR

F

M

2016

Sideram SRL

Pipes and Fittings

Italy

Sea

09/Nov/16

406

11/Oct/16 PO

PUR

F

M

2016

Ital Trade Services

Spare Parts and Metric ReductioItaly

Air

01/Nov/16

407

13/Oct/16 PO

PUR

F

E

2016

Italian Cable Company

Cables

Sea

17/Nov/16

408 15/Nov/16 PO

TPD

F

M

2016

RE.CO.MA

Gas Storage Cylinders

Austria/ItaSea

30/Mar/17

409

25/Oct/16 PO

TPD

L

E

2016 Sega-M

LV Panel Boards

Egypt

15/Nov/16

410

20/Oct/16 PO

PUR

F

C

2016

Tuxor

Steel Plates

Italy

Sea

27/Oct/16

411

26/Oct/16 PO

TPD

F

E

2016

Italian Lighting/Tecmar

Lighting Fixtures

Italy

Sea

30/Nov/16

412

Sea

08/Dec/16 21-Jan-17 05-Feb-16

Toilet Accessories

Sea Egypt/Chi Inland

04/Oct/16 18/Oct/16

24/Oct/16 18/Nov/16

Data communication Network S Egypt

SC

05/Oct/16

Expansion Joints

Air/Sea

10/Nov/16

Data Communication Network SEgypt

Inland

24/Oct/16

Data Communication Network SEgypt

Inland

24/Oct/16

AGRU

HDPE Pipes

Austria

Sea

29/Sep/16

PIPELIFE

Offshore Polyethylene Long, HigNorway

Sea

20/Sep/16

Data communication Network S Egypt

Inland

13/Nov/16

SAFET

Italy

Italy

Inland

20/Oct/16 PO

PUR

F

E

2016

Italian Cable Company

Cables

Italy

413 27/Nov/16 PO

TPD

F

E

2016

Schuch

Lighting Fixtures

Germany Sea

414

27/Oct/16 PO

TPD

L

C

2016

Modern Waterproofing

Water Proofing

Egypt

Inland

03/Nov/16

415

30/Oct/16 PO

TPD

L

E

2016 Sega-M

LV Panel Boards

Egypt

Inland

01/Nov/16

416

26/Oct/16 PO

PUR

F

M

2016

417 28/Nov/16 PO

TPD

L

E

2016 International Consultant Engineers ICE

418

25/Oct/16 PO

PUR

F

E

2016

419

26/Oct/16 PO

PUR

F

C

2016

420

Safet

Underground Cable/Pipe LocatoItaly

Air

Girard Industries Europe

FOAM PIG

Air

29/Oct/16 05/Dec/16

Cathodic Protection

Egypt

Inland

Economic Electric Company FEMI

Cable Trays

Italy

Sea

06/Dec/16

Tuxor

Steel Beams

Italy

Sea

02/Nov/16

Access Control System

Malaysia Inland

06/Dec/16 PO

TPD

L

E

2016 Anzma-Tech

422 02/Nov/16 PO

PUR

F

E

2016

423 08/Nov/16 PO

TPD

L

E

2016 Horizon For Industry

CCTV Console

Inland

26/Dec/16

424 17/Nov/16 PO

TPD

L

E

2016 Anzma-Tech

Access Control System & TurnsUSA

Inland

19/Nov/16

425 09/Nov/16 PO

OPE

F

C

2016

Global Sourcing Company

Bolts, Washers and Nuts

Sea

426 06/Nov/16 PO

TPD

F

M

2016

SANCO

Fire Fighting System for UBA, UItaly

427

Egypt

Italy

Air/Sea

09/Dec/16 23/Nov/16

21/Dec/16 15-Nov-16 01-Dec-16

12/Dec/16 PO

PUR

F

E

2016

Global Sourcing Company

Supporting Devices

Germany Sea

428 06/Nov/16 PO

PUR

F

E

2016

SITIE Impianti Industriali

Supporting Devices

Italy

Sea

05/Jan/17

429 09/Nov/16 PO

TPD

F

E

2016

Microntel

Gate Access Control

Italy/TurkeSea

07/Feb/17

430 17/Nov/16 PO

TPD

L

E

2016 Sega-M

LV Switchgear

Egypt

431 14/Nov/16 PO

OPE

F

M

2016

GEF SALES-PEVTCO

Ball Valves

432 15/Nov/16 PO

OPE

F

M

2016

RE.CO.MA

433 28/Nov/16 PO

TPD

F

M

2016

Eurocom

434 22/Nov/16 PO

TPD

F

M

2016

Seven Seas

435 20/Nov/16 PO

PUR

F

E

2016

436 20/Nov/16 PO

PUR

F

E

2016

437

09/Jan/17

Inland

01/Dec/16

Air

21/Nov/16

Argon & Hydrogen Hoses

Austria/ItaAir

25/Nov/16

Stop Logs

Italy

Sea

09/Jan/17

Hydro-Pneumatic Tanks

Italy

Sea

31/Jan/17

Italian Cable Company

Cables

Italy

Sea

01/Jan/17

TK-Kabel

Cables

Germany Sea

18/Dec/16

22/Feb/17 PO

TPD

L

C

2016 Jotun

Epoxy Coatings for external ste Egypt

Inland

22/Feb/17

438 29/Nov/16 PO

TPD

L

E

2016 Dtec

Data communication Network S Egypt

Inland

29/Nov/16

439 30/Nov/16 PO

TPD

L

E

2016 Middle East Company for Engineering

Instrument Tubing

Egypt

Inland

30/Nov/16

440 30/Nov/16 PO

TPD

L

E

2016 Universe

Data Network Accessories

Egypt

Inland

07/Dec/16

441

29/Dec/16 PO

PUR

F

M

2016

Pipes and Fittings

Italy

Sea

12/Jan/17

442 29/Nov/16 PO

TPD

L

E

2016 Anzma-Tech

Inland

06/Dec/16

Access Control System & TurnsMalaysia Inland

18/Apr/17 10-Dec-16 07-Mar-17

443

Sideram SRL

Access Control System & TurnsUSA

14/Mar/17 PO

TPD

L

E

2016 Anzma-Tech

444 29/Nov/16 PO

PUR

F

E

2016

TK-Kabel

Cables

Germany Sea

445 29/Nov/16 PO

PUR

F

M

2016

Idrosapiens

Pipe Supports

Italy

Page 6 of 9

Air

20/Dec/16


Burullus Combined Cycle Power Project ‐ Purchase Orders Log Type

Dept

F/L

E/M/C

Year

Local Supplier

Foreign Supplier

Item Description

PO Date

446

04/Dec/16 PO

TPD

L

E

2016 Otak Trading & Contracting

447

28/Feb/17 PO

TPD

F

M

2017

448

28/Dec/16 SC

TPD

L

M

2016 Semco

HVAC System

449

07/Dec/16 PO

TPD

L

E

2016 Otak Trading & Contracting

Earthing and Lightning

UK

Inland

450

13/Dec/16 PO

TPD

F

M

2016

Seven Seas

Non-Metallic Tanks

Italy

Sea

07/Mar/17

451

05/Dec/16 PO

TPD

F

M

2016

Saiver-Costruzioni Aerauliche

Air Handling Units

Italy

Sea

13/Mar/17

Earth Bars Emit Metito

Origin

UK

Chemical Laboratory Equipmen Europe

Air/Sea

Delivery Date

SN

Inland

04/Dec/16

Sea

23/May/17

Inland 21/Dec/16

452 31/May/17 PO

OPE

F

M

2016

Nuova Sguassero

Fiberglass-Reinforced Thermos Italy

Sea

30/Jun/17

453

15/Dec/16 PO

TPD

F

E

2016

Italian Lighting/Linergy

Lighting Fixtures

Sea

26/Jan/17

454

14/Dec/16 PO

PUR

F

C

2016

Lifting Safety

Camlok CLB Container Bottom UK

Air

21/Dec/16

455

20/Dec/16 PO

TPD

L

C

2016 Ceramica Cleopatra for Cement

Ceramic Tiles

Egypt

Inland

23/Dec/16

456

20/Dec/16 PO

TPD

L

C

2016 Ceramica Cleopatra (Fancy)

Ceramic Tiles

Egypt

Inland

457

20/Dec/16 PO

TPD

F

M

2016

20/Dec/16 15-May-17 30-May-17

Italy

Pompe Garbarino

Horizontal Centrifugal Water PuItaly

Sea Air

15/Jan/17

Austria/ItaAir

15/Jan/17 30-Jan-17 12-Feb-17

458

18/Dec/16 PO

OPE

F

M

2016

ETEA Sicurezza

Integration of Input Signals for FItaly

459

18/Dec/16 PO

OPE

F

M

2016

RE.CO.MA

Argon Hoses

460

18/Dec/16 PO

OPE

F

M

2016

SRI SAI RUBBER PRODUCTS PVT LTD

Rubber Compensators & Rubber Flexible Sea

461

28/Dec/16 PO

TPD

L

C

2016 Harmouch

Terazzo Tiles

Egypt

Inland

18/Jan/17

462

20/Dec/16 PO

TPD

F

E

2016

BEGHELLI

Lighting Fixtures

Italy

Sea

14/Feb/17

463

29/Dec/16 PO

TPD

F

E

2016

Tesylab Company

Active Switches

USA

Air

23/Feb/17

464

18/Dec/16 PO

PUR

F

M

2016

CTA-Commerciale Tubi Acciaio

Post Guard Pipes

Italy

Sea

28/Feb/17

465

18/Dec/16 PO

PUR

F

M

2016

CUNADO

Flanges and Fittings

Europe

Air

15/Jan/17

466

19/Dec/16 PO

OPE

F

M

2016

BONAR

Vertical Drains

Europe

Sea

16/Jan/17

467

25/Dec/16 PO

TPD

L

E

2016 Cable Net Egypt

Master Antenna TV System

China/Kor Inland

01/Jan/17

468

25/Dec/16 PO

TPD

L

E

2016 Grand International

Wiring Devices

France

Inland

27/Dec/16

469

04/Jan/17 11-Mar-17 23-Mar-17 06-Feb-17 06-Mar-17

28/Dec/16 PO

TPD

L

E

2016 3-Brothers

470 02/May/17 PO

TPD

F

E

2017

Safet (BEGHELLI)

Lighting Fixtures

Egypt

Inland

Lighting Fixtures

Czech

Sea

471

26/Dec/16 PO

OPE

F

M

2016

CVB Valves/Parcol

Valves

Italy

Air

472

26/Dec/16 PO

OPE

F

M

2016

Global Sourcing Company

Fire Pipes FM

UAE

Sea

473

02/Feb/17 PO

OPE

F

C

2017

Global Sourcing Company

Bolts, Washers and Nuts

KSA

Sea

474

02/Feb/17 PO

OPE

F

C

2017

Global Sourcing Company

Bolts, Washers and Nuts

KSA

Sea

475

04/Jan/17 PO

TPD

L

E

2017 Techno Printy

Access Control System

Malaysia Inland

476

15/Jan/17 PO

TPD

L

E

2017 Universe

477

01/Feb/17 PO

TPD

F

E

2017

478

15/Jan/17 PO

TPD

L

C

479

03/Jan/17 PO

OPE

L

C

480

15/Jan/17 PO

TPD

L

481

16/Jan/17 PO

PUR

482

17/Jan/17 PO

TPD

483

23/Jan/17 PO

484 485

23/Jan/17 25-Jan-17 14-Feb-17 26-Jan-17 02-Mar-17

Data Network Accessories

Egypt

Inland

26/Feb/17

Lighting Fixtures

Italy

Sea

08/Mar/17

2017 Future Office Furniture

Office Furniture

Egypt

Inland

22/Jan/17

2017 Proactive

Raised Floor & Aluminum SkirtinEgypt

Inland

10/Jan/17

E

2017 Grand International

Wiring Devices

France

Inland

12/Feb/17

F

C

2017

Safety Barrier

Italy

Air

28/Jan/17

L

E

2017 3-Brothers

Lighting Fixtures

Egypt

Inland

20/Jan/17

TPD

L

E

2017 I & R Egypt

Audio Video

Czech

Inland

06/Feb/17

17/Jan/17 PO

PUR

F

E

2017

Sea

21/Mar/17

22/Jan/17 PO

TPD

L

C

2017 Liveart

Residential Furniture

Egypt

Inland

29/Jan/17

486

23/Jan/17 PO

TPD

L

C

2017 Liveart

Residential Furniture

Egypt

Inland

487

01/Feb/17 PO

TPD

F

E

2017

Fael Luce/Delta Egypt Foreign Trading

Lighting Fixtures

Italy

Sea

15/Mar/17

488

13/Mar/17 PO

OPE

F

M

2017

Global Sourcing Company

Valves for Chemical Cleaning

Italy

Sea

01/May/17

489

30/Jan/17 PO

TPD

L

E

2017 Sega-M

LV Panel Boards

Egypt

Inland

06/Feb/17

490

30/Jan/17 PO

TPD

L

E

2017 Middle East Company for Engineering

Instrument Tubing

Egypt

Inland

30/Jan/17

491

30/Jan/17 PO

TPD

L

E

2017 Anzma-Tech

Access Control & Security SysteUSA

Inland

27/Feb/17

492

01/Feb/17 PO

TPD

F

E

2017

493

29/Jan/17 PO

OPE

L

E

2017 Elsewedy Electric Tools

494

12/Feb/17 PO

TPD

F

E

2017

495

06/Feb/17 PO

TPD

F

E

2017

496

05/Feb/17 PO

TPD

F

M

2017

497

11/Jul/17 PO

OPE

L

M

2017 Delta Carbon Gases

498

09/Feb/17 PO

OPE

F

M

499

14/Feb/17 PO

OPE

F

500

12/Feb/17 PO

OPE

F

501

13/Feb/17 PO

TPD

502

13/Feb/17 PO

TPD

503

16/Feb/17 PO

504 505

Italian Lighting/Tecmar

Safet

Global Sourcing Company

ENDRESS + HAUSER

Cable Ladders

Measuring Instruments

Germany Air

12/Apr/17

Electrical Lighting Lamp Discharge Hit Me Inland

29/Jan/17

ENDRESS + HAUSER

Measuring Instruments

Germany Air

23/Apr/17

ALFAQUADRI Company

LV Switchgear

Italy

Sea

07/Apr/17

DRAGFLOW S.R.L

Intake Sediment Removal SysteItaly

Sea

11/Jun/17

Gas for Gas Storage Cylinders Egypt

Inland

2017

CTA-Commerciale Tubi Acciaio

Piping, Bolts & Gaskets for Che Italy

Sea

M

2017

SpiraxSarco

Safety Valve

Italy

Air

04/Apr/17

M

2017

ETV-European Technology Valves

Fuel Gas Valve

Italy

Air

05/Mar/17

L

C

2017 Ceramica Cleopatra Fancy

Ceramic Tiles

Egypt

Inland

13/Feb/17

L

C

2017 Ceramica Cleopatra Fancy

Ceramic Tiles

Egypt

Inland

13/Feb/17

TPD

F

E

2017

Torgovity Dom Velan Limited

Explosion Proof Lighting FixtureRussia

Air

23/Mar/17

12/Feb/17 PO

OPE

F

M

2017

Global Sourcing Company

Hilti Expansion Anchors

Air

19/Feb/17

TK-Kabel

Italy

14/Jul/17 31-Mar-17 14-Apr-17

09/Feb/17 PO

PUR

F

E

2017

506 22/May/17 PO

TPD

L

E

2017 ElSewedy Electrical Equipment & Cables Company

Cables

Germany Sea

09/Mar/17

Lighting Poles

Egypt

Inland

22/May/17

507

15/Feb/17 PO

PUR

F

M

2017

508

16/Feb/17 PO

PUR

F

M

2017

Sideram SRL

Cast Iron Pipes and Fittings

Italy

Sea

08/Mar/17

Safet

Expansion Joints

Italy

Sea

509

19/Feb/17 PO

TPD

L

E

2017 Middle East Company for Engineering

24/Apr/17

Instrument Tubing

Egypt

Inland

26/Feb/17

510

23/Feb/17 SC

TPD

L

C

2017 Somie

511

19/Feb/17 PO

OPE

F

M

2017

512

19/Feb/17 PO

OPE

F

M

2017

Plastek S.r.l

CPVC Material and Tools

Italy

Sea

09/Apr/17

513

13/Mar/17 PO

TPD

F

C

2017

Italpannelli SRL

Sandwich Panel

Italy

Sea

10/Apr/17

514

09/Apr/17 PO

TPD

F

C

2017

Nofer (Al-Alamia)

Toilet Accessories

Spain

Sea

21/May/17

Waterproofing and Thermal InsuEgypt WIDOS

Page 7 of 9

-

Clamps for Widos Stub End HolGermany Air

23/Feb/17 05/Mar/17


Burullus Combined Cycle Power Project ‐ Purchase Orders Log SN

PO Date

Type

Dept

F/L

E/M/C

Year

Local Supplier

Foreign Supplier

Item Description

Origin

Air/Sea

Delivery Date

515

20/Feb/17 PO

OPE

F

M

2017

NUOVA SGUASSERO

GRP Spacers, Mesh & C ChannItaly

Sea

05/May/17

516

27/Feb/17 PO

TPD

F

M

2017

GH Italia Cranes and Components

Overhead Cranes for WorkshopSpain/ItalySea

22/May/17

517

06/Mar/17 PO

TPD

L

E

2017 Al Masria for Electrical Industries & Works

Wiring Devices (Explosion Proo Italy

20/Mar/17

518

05/Mar/17 PO

OPE

F

M

2017

YMI Co LTD

Titanuim Material

Korea/JapAir

14/Apr/17

519

15/Mar/17 PO

TPD

F

E

2017

SIELTE SPA

Paging System

Germany Air

24/May/17

520

Inland

27/Feb/17 PO

OPE

L

C

2017 Bita for Engineering & Trading

Chemical Cleaning Lining and InEgypt

Inland

521 14/May/17 PO

OPE

F

M

2017

Safet

Welding Electrodes

Italy

Sea

522

09/Mar/17 PO

TPD

F

M

2017

FAS Funi e Attrezzature per Sollevamento SpA

Miscellaneous Hoists

Italy

Sea

27/Jul/17

523

03/Apr/17 PO

TPD

L

C

2017 FAM Media

Signage

Egypt

Inland

17/Apr/17

27/Feb/17 05-Apr-17 12-Apr-17

524

15/Mar/17 PO

TPD

F

M

2017

GH Italia Cranes and Components

Overhead Cranes - Extra Mater Spain/ItalySea

525

02/Apr/17 PO

OPE

F

M

2017

RE.CO.MA

Bundles RCM2-H Spare Parts Austria/ItaAir

526

15/Mar/17 PO

PUR

F

E

2017

Economic Electric Company FEMI

Cable Trays and Accessories

Italy

Sea

527

20/Mar/17 PO

TPD

L

E

2017 Anzma-Tech

Access Control System

USA

Inland

528

20/Mar/17 PO

OPE

F

M

2017

DRAGFLOW S.R.L

Chemical Hoses and Titanium CItaly

Air

529

21/Mar/17 PO

OPE

F

M

2017

ETEA Sicurezza

Integration of Ethernet Module i Italy

Air

20/Apr/17

530

02/Apr/17 PO

OPE

F

M

2017

Williams Form Engineering

Special Anchor Plates, End CapUSA

Air

07/May/17

Williams Form Engineering

Post Tension Rods

USA

Sea

30/Apr/17

MV Termination Lugs

Egypt

Inland

27/Mar/17

Access Control System

USA

531

02/Apr/17 PO

OPE

F

M

2017

532

27/Mar/17 PO

OPE

L

E

2017 El Masria for Cables Manufactory-EMECA

533

30/Mar/17 PO

TPD

L

E

2017 Anzma-Tech

534

02/Apr/17 PO

OPE

F

M

2017

535

30/Apr/17 SC

TPD

L

C

2017 Guardian

536

05/Apr/17 PO

TPD

F

C

2017

537

11/Apr/17 PO

TPD

L

E

2017 ICOT

538

10/Apr/17 PO

OPE

F

M

2017

539

11/Apr/17 PO

OPE

L

M

2017 Al Salem Trading

Welding Electrodes

540 18/May/17 PO

TPD

L

E

2017 Universe

Data Network Accessories

Egypt

Safet

Italpannelli SRL

Veka Kimya Petrol ve

19/Apr/17 21/Apr/17 03/May/17 17/Apr/17 01/May/17

Inland

27/Apr/17

Pressure and Temperature Rec Italy

Air

16/Apr/17

Metal Fabrication

Egypt

SC

Sandwich Panel

Italy

Sea

CCTV Console

USA

Inland

13/Apr/17

Welding Electrodes

UK

Air

22/Apr/17

24/May/17

Inland

11/Apr/17

Inland

01/Jun/17

541 10/May/17 PO

TPD

L

C

2017 Liveart

Residential Furniture

Egypt

Inland

542

18/Apr/17 PO

TPD

L

E

2017 ElSewedy EMAS

Lighting Panels UMB

Europe

Inland

18/Apr/17

542

18/Apr/17 PO

TPD

L

E

2017 ElSewedy EMAS

LV Switchgear

Europe

Inland

18/Apr/17

544

11/Jun/17 PO

TPD

F

C

2017

Italpannelli SRL

Sandwich Panel

Italy

Sea

545

13/Apr/17 PO

OPE

F

E

2017

Global Sourcing Company

LV Terminal Lugs

Germany Air

546 04/May/17 PO

TPD

F

E

2017

Tesylab Company

Master Clock System

Italy

Sea

13/Jul/17

547

18/Apr/17 PO

OPE

L

C

2017 Bita for Engineering & Trading

Ceramic Fiber

France

Inland

18/Apr/17

548

20/Apr/17 PO

TPD

L

C

2017 Jotun

549

24/Apr/17 PO

OPE

F

M

2017

YMI Co LTD

Titanuim Material

Korea/JapAir

550

18/Apr/17 PO

PUR

F

E

2017

Economic Electric Company FEMI

Cable Trays and Accessories

Italy

551

30/Apr/17 PO

TPD

L

E

2017 Anzma-Tech

552 23/May/17 PO

TPD

F

M

2017

MAICO ITALIA-SEMCO

Fans

553 23/May/17 PO

TPD

F

M

2017

MAICO GULF-SEMCO

Fans

554

OPE

F

M

2017

WIDOS

Foil Set WIDOS 20000/2 EnhanGermany Air

04/May/17 27/Jun/17

24/Apr/17 PO

Epoxy Coating for External SteeEgypt

Inland

30/Jul/17 20/Apr/17

20/Apr/17 14/May/17

Sea

11/Jul/17

Inland

30/Apr/17

Italy

Sea

01/Aug/17

UAE

Sea

Access Control & Security SysteUSA

18/Jul/17

555 02/May/17 PO

TPD

L

E

2017 Grand International

Wiring Devices

France

Inland

556

12/Jun/17 PO

TPD

F

C

2017

Italpannelli SRL

Sandwich Panel

Italy

Sea

10/Jul/17

557 03/May/17 PO

OPE

F

M

2017

IGAMM S.R.L.

Gaskets

Italy

Air

24/May/17

ALFAQUADRI Company

LV Switchgear

Italy

Sea

08/Jul/17

Cranes

Egypt

SC

558 09/May/17 PO

TPD

F

E

2017

559 09/May/17 SC

TPD

L

M

2017 Misr for Engineering Works

560 18/May/17 PO

TPD

F

E

2017

Torgovity Dom Velan Limited

Explosion Proof Lighting FixtureRussia

561 11/May/17 PO

TPD

F

M

2017

GH Italia Cranes and Components

Gantry Crane

562 14/May/17 PO

OPE

L

M

2017 Al Salem Trading

563 15/May/17 PO

OPE

L

E

2017 Elsewedy Egytech

564 17/May/17 PO

OPE

F

M

2017

Special Bolt

Bolts, Stud Bolts & Nuts

Italy

565

12/Jun/17 PO

TPD

F

E

2017

Italian Lighting/Tecmar

Lighting Fixtures

Italy

Sea

24/Jul/17

566 25/May/17 PO

TPD

L

E

2017 Grand International

Wiring Devices

France

Inland

06/Jul/17

567 25/May/17 PO

TPD

L

E

2017 Anzma-Tech

Access Control & Security SysteUSA

Inland

25/May/17 20/Jun/17

Welding Electrodes Earthing Cables

Italian Cable Company

Air

Spain/ItalySea

15/Jun/17 01/Jun/17

Inland

14/May/17

Inland

29/May/17

Sea

28/Jun/17

568 23/May/17 PO

OPE

F

E

2017

LV Cables

Italy

Sea

569

01/Jun/17 PO

TPD

L

E

2017 Summit Technology Solutions

Pabx

Egypt

Inland

15/Jun/17

570 30/May/17 SC

OPE

L

M

2017 Sahara Industrial Services

Service Agreement - Chart RecoEgypt

SC

30/May/17

571 31/May/17 PO

OPE

F

M

2017

GH Italia Cranes and Components

Bus Bar System for Overhead CSpain/ItalySea

15/Jun/17

572

06/Jun/17 PO

OPE

F

M

2017

Veka Kimya Petrol ve

Shoulder Washer

USA

Air

18/Jun/17

573

18/Jun/17 PO

TPD

F

C

2017

Italpannelli SRL

Sandwich Panel

Italy

Sea

16/Jul/17

574

11/Jun/17 PO

TPD

F

M

2017

MAICO ITALIA-EGEMECH

Exhaust Fans

Italy

Sea

20/Aug/17

575

08/Jun/17 PO

OPE

F

M

2017

NUOVA SGUASSERO

GRP Spacer

Italy

Sea

15/Jun/17

576

14/Jun/17 PO

OPE

F

M

2017

Global Sourcing Company

Vacuum Air Breaker Valves

Korea

Air

12/Jul/17

577

16/Jul/17 PO

TPD

F

E

2017

Tesylab Company

Pabx

USA

Sea

24/Sep/17

Air

22/Aug/17

578

25/Jul/17 PO

TPD

F

E

2017

Torgovity Dom Velan Limited

Explosion Proof Lighting FixtureRussia

579

05/Jul/17 PO

OPE

F

M

2017

WIDOS

Computer Boards

580

04/Jul/17 PO

OPE

F

E

2017

RESINEX Trading S.R.L

Plastic Light Buoys-NavigationaItaly

Sea

581

10/Jul/17 PO

TPD

L

E

2017 Universe

Data Network Accessories

Egypt

Inland

10/Jul/17

582

06/Jul/17 PO

TPD

L

E

2017 Anzma-Tech

Access Control System

USA

Inland

583

10/Jul/17 PO

OPE

F

M

2017

06/Jul/17 29-Jul-17 29-Sep-17

RE.CO.MA

Page 8 of 9

Germany Air

Bundles RCM2 Hoses, Valves &Austria/ItaAir

19/Jul/17 30/Sep/17


Burullus Combined Cycle Power Project ‐ Purchase Orders Log SN

PO Date

Type

Dept

F/L

E/M/C

Year

Local Supplier

Foreign Supplier

Item Description

Origin

Air/Sea

Delivery Date

584

27/Jul/17 PO

TPD

F

E

2017

Italian Lighting/Tecmar

Lighting Fixtures

Italy

Sea

585

16/Jul/17 PO

OPE

F

M

2017

PIPELIFE

Gaskets

Norway

Air

10/Sep/17 23/Jul/17

586

18/Jul/17 PO

OPE

F

M

2017

Global Sourcing Company

Valves for ZTM System

Italy

Air

31/Jul/17

Access Control System and TurUSA

Inland

SAFET

Fittings & Bolts and Gaskets for Europe

Air

21/Aug/17

587

17/Jul/17 PO

TPD

L

E

2017 Anzma-Tech

588

19/Jul/17 PO

OPE

F

M

2017

589

20/Jul/17 PO

TPD

F

C

2017

Italpannelli SRL

Sandwich Panel

Italy

Sea

17/Aug/17

590

16/Jul/17 PO

PUR

F

C

2017

SAFET

Life Jackets

Italy

Air

22/Jul/17

591

19/Jul/17 PO

OPE

L

M

2017 Middle East Company for Engineering

592

25/Jul/17 PO

PUR

F

C

2017

Sideram SRL

593

27/Jul/17 PO

TPD

F

M

2017

594

02/Aug/17 PO

OPE

F

M

2017

595

31/Jul/17 PO

TPD

L

C

2017 Liveart

Residential Furniture

596

30/Jul/17 PO

OPE

F

M

2017

Plastek S.r.l

597

02/Aug/17 PO

TPD

L

C

2017 Protecta International Egypt

Instrument Hook-Up Support (E UK/USA Inland Rivets

Italy

EGEMECH

Fans

UAE

Global Sourcing Company

PVC Saddles & PTFE Sliding P USA Egypt PVC Saddles Epoxy Coatings

Page 9 of 9

Italy

Air

17/Jul/17

26/Jul/17 01/Aug/17

Sea

21/Sep/17

Air

01/Sep/17

Inland Air Sea

31/Jul/17 31-Jul-17 28-Aug-17

Inland

13/Sep/17


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.