S
E
L
E
C
T
E
D
UAN
2
0
0
8
W
O
R
K
S
GAO
-
2
0
1
4
YUAN GAO B.A.|M.Arch E: gaoyuan_a@163.com T: (+86)186 1157 4850 Beijing (+852) 5266 9109 Hong Kong 01
Yuan Gao is a Chinese Architect with M.Arch degree. She has 5 years work experiences in OMA Hong Kong, and Architectural Design & Research Institute of Tsinghua University. She has participated in a number of compelling architectural and urban design projects of varying scales and typologies, including cultural, mixed-use projects and high-rise buildings.
W
O
R
K
E
X
P
E
R
I
E
08/2013 – 07/2014 OMA Asia(Hong Kong) Ltd Architect 01/2010 – 08/2013 Architectural Design and Research Institute of Tsinghua University Co., Ltd (THAD) 09/2008 – 10/2009 The Architectural Design and Research Institute of HIT Internship
E
D
U
C
A
T
I
O
N
B
A
C
K
N
C
02
03
04
07
08
RECEPTION AREA
E
Architect
G
R
O
U
N
D
05
06
09/2003 – 07/2007 B.A. | Dalian University of Foreign Languages (DUFL) Major in Art Design (Environmental Art),GPA:3.64* TOP2% 09/2007 – 01/2010 M.Arch | Harbin Institute of Technology (HIT) Major in Architectural Design and Theory Supervisor: Dean Mei Hongyuan GPA:3.30* TOP5%
A
W
K
A
R
D
S
1st Prize Scholarship of the year of university (DUFL) (awarded to top 2%); 1st Prize for ‘Feminism Chair’, Dalian Furniture Design Competition 2nd Prize Scholarship of the year of university (DUFL) (awarded to top 5%); 1st Prize Scholarship of the year of university (DUFL) (awarded to top 2%); National Scholarship for university; Excellent Undergraduate Students of college (DUFL);
2003 - 2004 06/2004 2004 - 2005 2005 - 2006
S
53
I
L
L
S
&
L
A
N
G
U
A
G
E
S
C
E
09
10
13
14
11
12
15
16
Being skilled in using Auto CAD, Rhino, Sketch up, Illustrator, InDesign, Photoshop, etc. English (TOEFL iBT :91) Mandarin Chinese (Native)
P
R
O
J
E
C
T
E
X
P
E
R
I
E
N
As a key project team member
IN OMA ASIA(HONG KONG) LTD:
158,640sqm. Under Construction.
IN ARCHITECTURAL DESIGN AND RESEARCH 17. Nanning IT Headquarter INSTITUTE OF TSINGHUA UNIVERSITY CO(THAD): 195,466sqm. Under Construction. 18. Chengdu Urban Exhibition Hall 08. Chendu Eastern New Town Urban Design
02. Lize SOHO
41h ㎡ . Urban Design. Concept Design.
01. Tecent Beijing Headquarter
中中 央央 歌歌 剧剧 院院 剧剧 场场
5
贵宾通道
公众通道
Public Access 正门 Main Entrance
顶层餐厅通道 Access to Top Level Restaurant
地下前厅/主舞台下层通道 Access to Lower Lobby/Performance
露天演出平台通道 Access to Outdoor Performance Space
前厅与地下车库之间的通道 Access to Lobby from Car Park
105,750sqm. Design development.
10. Chengdu Shi Ling Park Urban Design
04. Ningbo Urban design of Zhongshan Road
1h ㎡ . Urban Design. Concept Design.
布景,舞台设备配送 Scene + Stage Goods Delivery
场景置换区 Exchange Area
场景置换区 Exchange Area 非工作时间餐厅+酒吧货物配送 Out of Hours Delivery to Restaurant + Bar
图例 Key 1.主舞台 Main Stage
7,500sqm. Concept Design.
2.露天演出平台 Outdoor Performance Space
3.
3.茶馆 Tea House 4.前厅 Foyer
2. 6.
4.
1.
9. 9.
5.
09. Chengdu Museum 80,000sqm. Under Construction.
Service Access
后台设备通道 Access to Backstage Facilities
通往小型话剧场 Access to Small Theatre
5.
03. Hanhwa Galleria Department Store
设备通道
Performance Access
连接保留四合院建筑和主舞台的通道 Access to performance spaces via Preserved Traditional Courtyard
通往主剧场 Access to Main Performance Space
4.
80,000sqm. Schematic Design.
演艺通道
VIP Access
8. 8.
10.
1.
5.机动车车库 Car Parking 6.办公区 Administration
7.
7.小型话剧场 Small Drama Theatre
5. 5.
5.
5.
8.化妆间 Dressing Rooms 9.排练厅 Rehearsal Rooms
横向剖面图
Section A-A 1:400 Scale
11. NiuHeLiang Archaeological Museum
19. Design of Song Yuan Culture Complex
05. Green Square Aquatic Center & Gunyama Park
3,000sqm. Completed.
15,319sqm. Completed.
12. Lake Theater
20. Museum Design of Heilongjiang Province
9,220sqm. Concept Design.
4,500sqm. Schematic Design.
50,000sqm. Under Construction.
06. Zhanjiang Cultural Center
13. Chengdu Media Center
134,431sqm. Schematic Design.
600,000sqm. Concept Design.
21. New Library of Dongbei University of Finance and Economics
07. Mckinsey Beijing Office
14. Catenary Tower
17,000sqm. Completed.
2,505sqm. Under construction.
300m Skyscraper. Under Construction.
15. China Central Opera House
22. Masterplan and Building Design of Ordos Sports Center
37,000sqm. Schematic Design.
149,132sqm. Schematic Design.
16. Beijing International Center of Drama
23. Urban Planning Exhibition Center
22,000sqm. Schematic Design.
58,267sqm. Schematic Design.
Section B-B 1:400 Scale
10.贵宾厅 VIP
北京国际戏剧中心工程
IN THE ARCHITECTURAL DESIGN AND RESEARCH INSTITUTE OF HIT:
158.0h ㎡ . Concept Design.
纵向剖面图
5
17
18
19
20
21
22
22
23
HO OGRA H 1
2
3
4
OR S
1. EXIT AND ENTRANCE, Milan 2. TUNNEL, Taiwan 3. BABEL, Macao 4. STREET FOOTBALL, Hong Kong
My own way of thinking is a dialectical process of deconstruction and reconstruction of knowledge and understanding. An uncompromising attitude has been built up through the critical and systematical way of observation. Architecture is not the ultimate achievement, but a medium and platform communicating to the world and to the time. As an urban explorer, the multiple roles, architect and photographer, bring me variation of the prespective to observe the daily life. Creativity and enthusiasm are inspired by those experiences. As an architect, with the previous experiences, I am traveling around the world, exploring the potential and discovering the opportunity as much as I can.
1st Prize in Competition 2013 Completed Museum
CHENGDU MUSEUM
CHENGDU,SICHUAN PROVINCE,PRC CHENGDU MUSEUM FLOOR AREA _80,000sqm IN COLLABORATION WITH SUTHERLAND HUSSEY ARCHITECTS
SURROUNDING
The museum will form the entire western edge of the city s most important square The facade attempts to bring cohesion to an otherwise disjointed square. The proposal includes the creation of a pedestrian route through the site, takes tourists from the mosque in the southwest coner of the site and science museum which is the main building on the city a is
3.SIGHTSEEING CORRIDOR
2.DYNAMIC EXHIBITION
STRUCTURE DESIGN
INTERIOR DESIGN
The top floor, has a m long sightseeing corridor which faces the Tianfu square and provides visitors with an opportunity to enjoy the good views. A dynamic e hibition hall in the museum, provides a open and owing space in different level isitors ourny through the space by a ramp which allows them to freely access the e hibits on the different levels t is a dynamic ow line with view and time The entrance lobby is playing an important role in the morden museum. It is not only a transportation node, but also a open public space for tourist The material used in the lobby is copper and white stone, keeping a relationship to the e terior facade, presenting a noble atmosphere
1st Prize in Competition 2013 Completed Museum
CHENGDU MUSEUM
st ri e in ompetition 2013 Completed Museum
CHENGDU MUSEUM
ecause of triangle is the most stable and most efficient geometric mechanics, structural units, architecture art with geometric elements are delta slice, triangle shaped grid cells, triangle-sided cone. ION A t t h e s a m e t i m e , a p p l y i n g cIN u r r eRODUC nt international most advanced large-span C engd m se m is located to t e est of t e spatial structures, integrated management ianF s are in C engd ianf s are is in t e technique of high rise structures worked intersection of t e cit a is e m se m re irements together, construct the best mechanical e tend to o er 0,000s m of de elopment and ill inclsteel de e ibition space for nat ral istor , istor and ef ciency of the e ternal shell cylinder fol , and c inese s ado pla , as ell as a large area for frame system temporar ain steel structure system work together to e ibition It ill be t e most important c lt ral b ilding substantially increase the seismic safety of in C engd cit and need to assert itself on t e ianf s are order to against a bac gro nd of e er public buildings, and effectively eliminate increasing commercial de elopment the subway crossing caused by vibration effection alculation and analysis, more than degree requirement for earthquake resistance in Chengdu area 9-degree earthquake, the building still has a good structure.
1.ENTRANCE LOBBY
32.0M 3
2.DYNAMIC EXHIBIT
LOBBIES
PODIUM
25.0M
PLATFORMS
18.0M LOBBIES
PODIUM
PLATFORMS
11.0M SPECIAL EXHIBITION HALL
EXHIBITION HALL
1
TEMPORARY EXHIBITION HALL
3.SIGHTSEEING CORRIDOR
SPECIAL EXHIBITION HALL
EXHIBITION HALL
4.0M 0.0M
TEMPORARY EXHIBITION HALL
-5.0M THEATRE &MULTIMEDIA
DYNAMIC EXHIBITION HALL
THEATRE &MULTIMEDIA
DYNAMIC EXHIBITION HALL
SERVICES FACILITIES
CURTAIN WALL DETAIL MODEL
COORDINATES
EXPAND VIEW
1.ENTRANCE LO
MATERIAL
-10.0M
SERVICES FACILITIES
GLASS 6656.8sqm 4.0% 2.DYNAMIC EXHIBITION
STOREROOMS
RESEARCH &ADMINISTRATION
RESEARCH &ADMINISTRATION
STOREROOMS
74
-16.5M -21.0M
CORES CORES
čŽžčŽĄĺˆ†ćž?
STRUCTURE DESIGN
ecause of triangle is the most stable and most efficient geometric mechanics, structural units, architecture art with geometric elements are delta slice, triangle shaped grid cells, triangle-sided cone. At the same time, applying current international most advanced large-span spatial structures, integrated management technique of high rise structures worked together, construct the best mechanical ef ciency of the e ternal shell cylinder steel frame system ain steel structure system work together to substantially increase the seismic safety of public buildings, and effectively eliminate the subway crossing caused by vibration effection alculation and analysis, more than degree requirement for earthquake resistance in Chengdu area 9-degree earthquake, the building still has a good structure.
MATERIAIL PHYSICAL MODEL
PERFORATED 5950.6sqm 21.46% 1st Prize in Competition CHENGDU 2013 Completed Museum Musem
ćˆ? éƒ˝ ĺ?š 牊 錆 C
39.0M 32.0M 25.0M 18.0M 11.0M 4.0M INTERIOR DESIGN 0.0M The top floor, has a m long sightseeing corridor -05.0M which faces the Tianfu square and provides visitors -10.0M with an opportunity to enjoy the good views. A dynamic e hibition hall in the -16.5M museum, provides a open and owing space in different level isitors -21.0M
15% GENERAL EXHIBITION 9% TEMPORARY EXHIBITION
15% GENERAL EXHIBITION
5% SPECIAL EXHIBITION
9% TEMPORARY EXHIBITION 18% STOREROOMS
5% SPECIAL EXHIBITION 18% STOREROOMS
ourny through the space by a ramp which allows them to freely access the e hibits on the different levels t is a dynamic ow line with view and time 9% RESEARCH&ADMINISTRATION The entrance lobby is playing an important role in 13% PUBLIC 9% morden RESEARCH&ADMINISTRATION the museum. It is not only a transportation 13% SERVICES node, but also a open public space for tourist The 13% PUBLIC material used in the lobby is copper and white 2013 13%Completed EDUCATION stone, keeping a relationship to the e terior facade, 13% SERVICES Museum presenting a noble atmosphere 13% EDUCATION 1.ENTRANCE LOBBY
ćˆ? éƒ˝ ĺ?š 牊 錆 C
72
H
E N
G
D
U
M
U
S E U
H
E N
G
D
U
M
U
S E U
MUSEUM
73
M
75
M
C
H
E N
75
COPPER 13523.8sqm 48.76%
ćˆ? éƒ˝ ĺ?š 牊 錆 G
D
U
M
U
S E U
M
čŽžčŽĄĺˆ†ćž?
FACADE MATERIAL
Time is the eternal topic between culture and architecture hengdu useums facade is glass and copper, which play an important role in the history of human materials Day and night, copper under light, showing a different color, light and shadow effects lass is rich in color, te ture and transparency, it reflects on the perimeter of the sensitive and delicate changes and the replacement of four seasons
CHENGDU MUSEUM
st ri e in ompetition 2013 Completed Museum
CHENGDU MUSEUM
st ri e in ompetition 2013 Completed
CHENGDU
MATERIAIL PHYSICAL FACADE 0
5
10
st ri e in ompetition 2013 Completed Museum
30M
CHENGDU MUSEUM
0
5
10
4.0M PLAN
30M
STRUCTURE DESIGN 0
5
10
0
5
10
18.0M PLAN 30M
32.0M PLAN 30M
ecause of triangle is the most stable and most efficient geometric mechanics, structural units, architecture art with geometric elements are delta slice, triangle shaped grid cells, triangle-sided cone. At the same time, applying current international most advanced large-span spatial structures, integrated management technique of high rise structures worked together, construct the best mechanical ef ciency of the e ternal shell cylinder steel frame system ain steel structure system work together to substantially increase the seismic safety of public buildings, and effectively eliminate the subway crossing caused by vibration effection alculation and analysis, more than degree requirement for earthquake resistance in Chengdu area 9-degree earthquake, the building still has a good structure.
st ri e in ompetition 2013 Completed Museum
CHENGDU MUSEUM
西二旗站 Xi ’ e r q i St a t i o n
2
Ba i w a n g s h a n
腾讯办公室现址 Ex i s t i n g Te T n c e n t Lo c a t i o n s
1
中关村软件园 Z - Pa r k
Te n c e n t Si t e T
五环路 5t h Ri n g Ro a d
安和桥北站 An h e q i a o No r t h St a t i o n
奥林匹克公园 Ol y m p i c Pa r k Si g m a Bl d g . C t e x To To w e r
1st of international competition 201 , Of ce b ilding Concept design to design de elopment
ECEN HEAD UAR ER BEI ING, RC GFA 0,000s m
Si l v e r T Tee c h n o l o g y To T w e r 三环路 3 r d Ri n g Ro a d
故宫 F o r b id d e n C ity
中央电视台 C C TV
Interaction, Comm nication, Co esion While Tencent’s products, like QQ, are based on increasingly virtual methods of communication, physical proximity has not lost its relevance for creative interaction. The consolidation of all staff in a single volume defines the overall identity of headquarters, the internal functionality and flexibility of its internal workspace, and the interaction, communication, and cohesiveness of its staff.
CON E
1 .4 .
Ar c h i t e c t u r a l C o n c e p t
合
Phase 1 of Z-Park is nearly completely, while the masterplan for Phase 2 is nearly finalized. In both phases, the Zhongguancun Software Park planning indicators enforce an overall height limitation, due to the satellite receiving stations in the north. This dictates a low-rise, campus-like urban fabric within the Z-Park. In addition, low maximum site coverage dictates compact buildings and residual open space.
座
1 .4 .
In te r a c tio n , C o m m u n ic a tio n , C o h e s io n Wh i l e Te n c e n t ’ s p r o d u c t s , l i k e Q Q , a r e b a s e d o n i n c r e a s i n g l y v i r t u a l me t h o d s o f c o mmu n i c a t i o n , p h y s i c a l p r o x i mi t y h a s n o t l o s t i t s r e l e v a n c e f o r c r e a t i v e i n t e r a c t i o n . The consolidation of all staff in a single volume defines the overall identity of headquarters, the internal functionality and flexibility of its internal workspace, a n d t h e i n t e r a c t i o n , c o mmu n i c a t i o n , a n d c o h e s i v e n e s s o f i t s s t a f f . A s q u a r e w a s almost inevitable; its stability, simplicity, and robustness defines a strong corner to t h e Z h o n g g u a n c u n So f t w a r e P a r k a n d e n s u r e s t h e c o l l e c t i v i t y o f t h e c o mp a n y . It s bigness, at mx m, defines an interior that works more like a city rather than a b u ild in g .
Ar c h i t e c t u r a l C o n c e p t
合
Tencent’s plot is located at the southwest corner of Phase 2. Initially Tencent acquired 5 plots, however, 4 plots have now been consolidated into a primary plot (P-1) and a satellite plot (T-2), separated by Z-Park 1 .4 . Ar c h i t e c t u r a l C o n c e p t Vertical One Road. Baidu and Lenovo have similarly consolidated several plots for their future headquarters located to the north of Tencent.
座
面
In te r a c tio n , C o m m u n ic a tio n , C o h e s io n Cuts Define Entrances Wh i l e Te n c e n t ’ s p r o d u c t s , l i k e Q Q , a r e b a s e d o n i n c r e a s i n g l y v i r t u a l me t lices h o d s on o f the bottom define entrances and creates the appearance of lightness, a c o mmu n i c a t i o n , p h y s i c a l p r o x i mi t y h a s n o t l o s t i t s r e l e v a n c e f o r c r e a t i v floating e i n t e r a c figure tio n . The consolidation of all staff in a single volume defines the overall identity of headquarters, the internal functionality and flexibility of its internal workspace, a n d t h e i n t e r a c t i o n , c o mmu n i c a t i o n , a n d c o h e s i v e n e s s o f i t s s t a f f . A s q u a r e w a s almost inevitable; its stability, simplicity, and robustness defines a strong corner to t h e Z h o n g g u a n c u n So f t w a r e P a r k a n d e n s u r e s t h e c o l l e c t i v i t y o f t h e c o mp a n y . It s bigness, at mx m, defines an interior that works more like a city rather than a b u ild in g .
合
景
景观 R o o f L a n d s c a p e a t 7 F S e t b a c k
立面
In d o c a l a mu s l a t i f o l i u s
R o o Av o a n d 面 e le v Sa s a f o r t u n e i
景
f S e tb a c k l u me i s s e t b a c k f r o m t h e t o p t o p o s s i b i l i t y f o r t h e r o o f . Th e s e t b a tio n s . St i p a
The 7th floor features a setback edge, creating a 28.5m wide panoramic loop of outdoor space directly accessible 与 c r e a t e a p a n o r a mi c l o o p o f o u t d o o r s p a c e a c from k a l s o ma i the n t a i n s t inside h e s l e n C d e o r u n r spaces. e t sy s a r o d f s t h e f o u r Th r e e c o u r t y a r d s , a t r a d i t i o 1 n .a 7 l . a 2 r c h i t e c t u r e d Ov e v i c e e r a o l f l BeC i i r j i c n u g , l a a t r i e o
Cuts Define Entrances lices on the bottom define entrances and creates the appearance of lightness, a figure
面景观
V is ib ility
P - 1 Ma i n Bu i l d i n g
Te n c e n t s t a f f a r r i v i n g f r o m B2 a n d B3 b a s e me n t p a r k i n g u s e e s c a l a t o r s l o c a t e d i n t h e n o r t h e a s t a n d s o u t h w e s t c o u r t y a r d s t o g e t t o 1 F.
1 0
Op h i o p o g o n j a p o n i c u s
景
Op h i o p o g o n p l a n i s c a p u s Ni g r e s c e n s
D e s ig n Th e p a t t e r n i n t h e l a n d s c a p s u c h a s th e Q Q -n e tw o rk th f o r me d b y a w e b o f l i n e a r p b u ild in g to its s u r r o u n d in g , le a d in g th e v is ito r to th e v a c o n tin u e a s in te r io r ‘s tr e e ts
. m
e is b a s a t w a s d a th s th a th e g a rd r io u s e n ’.
e d e s t r e n tra
o n a d ia g r a mfo r a c i g n e d b y Te n c e n t . Th u n th r o u g h th e e n tir e to th e b u ild in g a n d n c e s o f th e b u ild in g w
o mmu n e g a rd e p lo t, c o d ir e c tly h e re th
ic a tio n d e n n e c o r in e p a
0 m
1 0
3 0 .20 %
与
1
面景观 La n d s c a p e a t Gr o u n d Fl o o r 1 : 1 50 0
s Bu e ttl hu fS af
Ba
se
m 车 en tC ar
pa
rk
St
ff Ta 车 xi D ro po s w
S pe r o c ia gr l am s P
0
观 A Pa udi 车 rk e n c in e 车 g B us
ud
St u
pa
pa ar tC 车 m en se Ba To
m 车 en tC ar
rv e r
se
Se
Ba
IT
rk
B 1
T- 2 En e r g y C e n t e r
rk rp a C a ent em Ba s
ito
0 50 d i o 1
d io 1
3 2 r iu m 0
St u
a d
A
ro
p-
of
f
50
D
o e R
rk rp a C a ent em Ba s
C o o lin g To w e r Bo ile r P la n t C h ille r P la n Su t mp Ta n k
FS
17
Program plans
Se a t i n g
Offices
车 S h u ttle b u s d r o p -o ff (1 6 )
Amenities
Se a t i n g
Se a t i n g
Academy
1 8 0 m
S ta ff C a n te e n
Te n c e n t Ac a d e m y
Media VIP
to 3 F o ffic e lo b b y
Se a t i n g
Ex e c u t i v e
Main lobby
Ma i n L o b b y
7F
6F
Se a t i n g
Services
B
B
T- 2 En e r g y C e n t e r
B fro m
B fro m
车库 B 2 /B 3 Pa r k i n g
Se a t i n g
Se a t i n g
Se a t i n g
Se a t i n g
车库 B 2 /B 3 Pa r k i n g Se a t i n g
Se a t i n g
to o ffic e s Vo i d
5F
So u t h We s t Ga r d e n
P - 1 Ma i n Bu i l d i n g
1 8 0 m
B B 车库 fr o m B 2 /B 3 Pa r k i n g
to 2 F Au d i t o r i u m
4F
Se a t i n g
3F
Se a t i n g
Se a t i n g
B to B 1 S tu d io s K itc h e n
Se a t i n g An d Se r v i n g Ar e a
B to B 1 7 F 6 F 5F 4 F 3 F 2F
Se a t i n g
to B 1 S tu d io s & 2 F Au d i t o r i u m
K itc h e n
Ma i n Lo b b y
Ba n q u e t Ha l l Se a t i n g An d Se r v i n g Ar e a
B
V I P R EC EPTI ON
C o u rty a rd s Th r e e c o u r t y a r d s , a t r a d i t i o n a l a r c h i t e c t u r e d e v i c e o f Be i j i n g , a r e e x c a v a t e d f r o m t h e c e n t e r . Th e t r i a n g u l a r c o u r t y a r d s p r o v i d e v a r i a t i o n a n d i n t e r e s t w i t h i n t h e exceptionally large floor plan, as well as daylight, ventilation and nature to the interior.
Sp e c i a l Pr o g r a m
Sp o r t s
Re t a i l
Re t a i l
Sp o r t s
Sp o r t s
Sp o r t s
车 V IPc a r p a r k in g (5 )
T- 2 En e r g y C e n t e r
Op h i o p o g o n p l a n i s c a p u s Ni g r e s c e n s
25
3 2
2F
Au d i t o r i u m
1F
B1
1 St u d i o 1
3 St u d i o 3 1 St u d i o 1
Au d i e n c e Fo y e r It It Ro o m
1 s t Fl o o r C i r c u l a t i o n 1 : 1 0 0 0
No r t h Ea s t Ga r d e n
24
Se a t s
V is ito r c o a c h p a r k in g (1 0 )
Vi p Lo u n g e
Au d i e n c e Lo b b y
Me d i a
Ex h i b i t i o n
2 St u d i o 2
1 F B1 B2 B3
面景观 La n d s c a p e a t Ro o f P l a n 1 : 1 50 0 Ne t w o r k C i r c l e
d io St u n e o to Z o P h io n s s c u e n c h K it
Se a t i n g
C o n c lu s io n Th e ‘ Ne t w o r k Ga r d e n ’ r e p r e s e n t s t h e c o mp a n y ’ s e n e r g e t i c , i n g e n i o u s a n d c o n n e c t i v e character the linear paths offer efficient connections between one point to the next, c r e a t i n g a w e b o f r o u t e s t h a t l e a d t o n u me r o u s s p a t i a l e x p e r i e n c e s , e n c l o s e d o r o p e n , p u b l i c o r p r i v a t e , c o mp l e x o r s i mp l e . As t h e p a t h s r u n a l o n g o r c u t t h r o u g h fields at different angles and lengths, they choreograph the movements, views and experiences of its visitors, influencing their mood and temperament on the w a y a n d t h u s t h e i r p r o f e s s i o n a l a c h i e v e me n t s . To s h o w Te n c e n t ’ s e n v i r o n me n t a l r e s p o n s ib ilitie s 合 a s w e ll a s to r a is e u s e r s ’ a w a r e 与 n e s s o f i t , n a t u r a l e l e me n t s a 合 re u s e d Sp o r t l a w n - Mi x e d s p e c i e s o f g r a s s e s with meadow flowers and bulbs s t r a t e g i c a l l y t o mi n i mi z e e n v i r o n me n t a l n e g a t i v Mix i t i e s mixed .
Op h i o p o g o n j a p o n i c u s
On a l
Overall circulation
Le d l i g h t - l i n e s – i n t e g r a t e d i n t h e ma i n p a t h s w i l l e mp h a s i z e t h e c o n n e c t i o n c o n c e p t a n d p r o v i d e e x t e r i o r l i g h t i n g a t n i g h t ; a l t h o u g h t h e ma i n s o u r c e w i l l b e t h e b u i l d i n g its e lf. Sa s a f o r t u n e i St i p a
To t a l
r tic Ve
Bu s
25
n n e tw o rk s ig n is th u s tin g th e d ir e c tly – th s , o fte n ,
In d o c a l a mu s l a t i f o l i u s The network of paths creates a series of various sized triangular fields that each form a different type of garden sports field, flower bed, lawn, topiary, bamboo garden, o r c h a r d o r s h a d i n g f o r e s t , r o o m, p l a z a o r e n t r a n c e a r e a ; e a c h a l l o w i n g f o r a l l k i n d s o f d i f f e r e n t f u n c t i o n s , p r o g r a ms , u s e s a n d e x p e r i e n c e s . Wh e r e t h e p a t h s c r o s s , t h e y f o r m ‘ c o n n e c t i o n p o i n t s ’ : r o u n d s q u a r e s f o r me e t i n g a n d r e l a x a t i o n , w i t h o r w i t h o u t a s h a d i n g t r e e a n d s e a t i n g o p p o r t u n i t y . Wh e r e n e c e s s a r y t h e s e s a me ‘ p o i n t s ’ i n t e g r a t e emergency exit stairs for the parking floors below.
S t a f f
2 F
与
L a n d s c a p e C o n c e p t: ‘N e tw o r k G a r d e n ’ Th e c o n c e p t f o r t h e l a n d s c a p e d e s i g n o f t h e n e w Te n c e n t He a d q u a r t e r i n Be i j i n g reflects the very essence of the company Connecting
C o u rty a rd s In te n tio n Ou r i n t e n t Th i o n w ri t h e t h e e ‘ Nec t w o o r u k ’ r g a t r y d e a n d r e d s i g s n i , s t oa c r e t a r t e a a d l a n i d t s i c o a p n e ( a b o l t h a o u rt s c i d e h i t e c t u r e f S e tb a c k d e v i c e o f Be 1 i j 8i n 0 g m , a re e x c a v a te d fro m a n d in s id e th e b u ild in g ) th a t w ill n o t o n ly r e p r e s e n t a d e c o r a tiv e , s e a s o n a l g a r d e n l u me i s s e t b a c k f r o m t h e t o p t o c r e a t e a p a n o r a mi c l o o p o f o u t d o o td r h o a w t s n c a po n r wba t e h h ce e n n e j po ay se c sd i n e f r g o nmb y t t ch e ae r w ra o t.r v k a Thsr i p o a u c s e e s s p l e o t e o rd k si i n ; a g b uo n tu at ,g l s f r o o u ma l g i a t a s r dr r o e o n cf - t g h o a a r t d u w e in l rl lr ot e o y p k r ie a n s g e r n d t s p r o v i d e v a r i a t i o n a n d i n t e r e s t w i t h i n t h e t h e c o mp a n y t h r o u g h i t s oP r l ga na tn i n i z g a Sc t i o n h e a d n u d l e a , e Ros t h o e f t i c ; t h a t w i l l i n v i t e a n d a c c o mp a n y p o s s i b i l i t y f o r t h e r o o f . Th e s e t b a c k a l s o ma i n t a i n s t h e s l e n d e r n e s s p e o o p l e f i n t exceptionally h e fo u r f o r w o r k a n d v i s i t s ; a n d t h a t w large i l l o f f e r i t s s t a floor f f c o n d i t i o n plan, s t h a t i n s p i r as e t h e mwell as daylight, ventilation and nature to the interior. a n d t h a t h e l p e n h a n c e t h e i r a c h i e v e me n t s . a tio n s .
3 5m 29 m
1 7 0 m
a rk
Z -P
On 1 F, Te n c e n t s t a f f a r r i v e t o t h e n o r t h e a s t c u t ( t h e ma i n l o b b y ) , v i s i t o r s a n d a u d i e n c e s a r r i v e t o t h e s o u t h e a s t c u t , a n d V IP s a r r i v e t o t h e s o u t h w e s t c u t .
盖
V IP
1 8 0 m
车
景观
-1 F B 1
Di s
T- 2 En e r g y C e n t e r
与 合 Mix mixed with meadow flowers and bulbs
景观
合
7 F 6 F 5F 4 F 3 F 2F 1 F B1 B2 B3
o ff opiD r Ta x
ff p -o D ro
观
合 Sp o r t l a w n - Mi x e d s p e c i e s o f g r a s s e s
R o o Av o a n d e le v
a d
rk rp a C a ent em Ba s
en x c a v a t e d f r o m t h e c e n t e r . Th e t r i a n g u l a r c o u r t y a r d s p r o v i d e v a r i a t i o n a n d i n t e r e s t w i t h i n t h e exceptionally large floor plan, as well as daylight, ventilation and nature to the interior.
The th floor features a setback edge, creating a . m wide panoramic loop of floating o u td o o r s p a c e d ir e c tly a c c e s s ib le fr o mth e in s id e s p a c e s .
The entire landscape pattern of the ground floor is continued on the roof the system of white paths and the irregular fields with pavement, semi paved and the lower p l a n t i n g s p e c i e s . On t h e o u t e r e d g e o f t h e r o o f r u n s a c o n t i n u o u s r u n n i n g t r a c k t h a t a l l o w s p e o p l e t o j o g o r w a l k i n t h e i r b r e a k s b u t a l s o a c t s a s a p r o me n a d e f r o m w h e r e o n e c a n o v e r l o o k t h e Te n c e n t l a n d s c a p e a n d t h e e n t i r e s u r r o u n d i n g l a n d s c a p e . Sp o r t i v e a c t i v i t i e s a r e p o s s i b l e a l mo s t e v e r y w h e r e o n t h e r o o f , b u t t h e r e a r e t w o specific sports fields One multifunctional sports court and two tennis badminton 立面 fields. ext to that there will be ping pong tables and outdoor gym equipment. So me o f t h e s e mi - p a v e d c i r c l e s a r e r a i s e d t o c r e a t e i n t e g r a t e d c i r c u l a r b e n c h e s
s s Tw o R o
观 Au d i e n c e
Landscape at roof plan Total green(RF):32.60
p e
s e Bu C f f Shr u t t l o St a
P - 1 Ma i n Bu i l d i n g
To
Landscape at Ground Floor Total green(1F):30.20 1 . 6 . 景观 L a n d s c a
24 .50 %
a rk
与1 8 0 m R o o f S e 面t b a c k A v o l u me i s s e t b a c k f r o m t h e t o p t o c r e a t e a p a n o r a mi c l o o p o f o u t d o o Cr s o p u a r c t y e a r d s Cuts Define Entrances 座 a n d p o s s i b i l i t y f o r t h e r o o f . Th e s e t b a c k a l s o ma i n t a i n s t h e s l e n d e r n e s s Th o r f e t he e c o f o u u r rt y a r d s , a t r a d i t i o n a l a r c h i t e c t u r e d e v i c e o f Be i j i n g , a r e e x c a v a t e d f r o m lices on the bottom define entrances and creates the appearance of lightness, a t h e c e n t e r . Th e t r i a n g u l a r c o u r t y a r d s p r o v i d e v a r i a t i o n a n d i n t e r e s t w i t h i n t h e e le v a tio n s . In te r a c tio n , C o m m u n ic a tio n , C o h e s io n floating figure exceptionally large floor plan, as well as daylight, ventilation and nature to the interior. Wh i l e Te n c e n t ’ s p r o d u c t s , l i k e Q Q , a r e b a s e d o n i n c r e a s i n g l y v i r t u a l me t h o d s o f c o mmu n i c a t i o n , p h y s i c a l p r o x i mi t y h a s n o t l o s t i t s r e l e v a n c e f o r c r e a t i v e i n t e r a c t i o n . The consolidation of all staff in a single volume defines the overall identity of Xi b headquarters, the internal functionality and flexibility of its internal workspace, e iw a n g S o u a n d t h e i n t e r a c t i o n , c o mmu n i c a t i o n , a n d c o h e s i v e n e s s o f i t s s t a f f . A s q u a r e w a s P l a n t i n g Sc h e d u l e , Ro o f th Ro 1 8 0 m a d almost inevitable; its stability, simplicity, and robustness defines a strong corner to P - 1 Ma i n Bu i l d i n g t h e Z h o n g g u a n c u n So f t w a r e P a r k a n d e n s u r e s t h e c o l l e c t i v i t y o f t h e c o mp a n y . It s bigness, at mx m, defines an interior that works more like a city rather than a 1 0 b u ild in g . 景
ANDSCA E
52.3 9 %
Pe d e s t r i a n
Z -P
立面
ce ie n g Au d r k i n Pa
1 0 0 %
Bi c y c l e
a d
景
合
VIP
景
Ta x i
do
Ro s t
The building is arranged generally with offices on level 2F-6F and amenities at the bottom, and to a lesser extent, the top. On level B1-2F, the staff areas are most to the north, and media areas (for audiences and visitors) are 1 8 0 m located to the south.
VIP Ve h i c l e s Sh u t t l e Bu s
in
a g E a n e iw Xi b
o o r s p a c e e s s o f th e fo u r
1 3
Overall Program Distribution
Se c u r i t y c h e c k p o i n t
1 8 St0 a m ff c a rs ( ) Tr u c k s ( n o n - p e a k h o u r s o n l y )
W
Gr o u n d F l o o r Ve h i c u l a r , Bi c y c l e a n d Pe d e s t r i a n C i r c u l a t i o n
rk
立面
Site Circulation and Traffic Roof Setback Co rt ards 座 R o o f S e tb a c k A volume isI n setback from the top Three courtyards, a traditional A v o l u me i s s e t b a c k f r o m t h e t o p t o c r e a t e a p a n o r a mi c l o o p o f o u t d 面 te r a c tio n , C o m m u n ic a tio n , C o h e s io n a n d p o s s i b i l i t y f o r t h e r o o f . Th e s e t b a c k a l s o ma i n t a i n s t h e s l e n d e r n to create aWhpanoramic i l e Te n c e n t ’ s p r o d u loop c t s , l i k e Qof Q , a r e b a s e d o n i architecture n c r e a s i n g l y v i Cuts r t u a l me t h o d s Entrances o f device of Beijing, are Define e le v a tio n s . c o mmu n i c a t i o n , p h y s i c a l p r o x i mi t y h a s n o t l o s t i t s r e l e v a n c e f o r c lices r e a t i v on e i the n t e r bottom a c t i o n . define entrances and creates the appearance of lightness, a outdoor space and possibility for the excavated from the center. The The consolidation of all staff in a single volume defines the overall identity of floating figure headquarters, the internal functionality and flexibility of its internal workspace, roof. The setback also maintains the triangular courtyards provide variation n d t h e i n t e r a c t i o n , c o mmu n i c a t i o n , a n d c o h e s i v e n e s s o f i t s s t a f f . A s q u a r e w a s slendernessaalmost of the four elevations. and interest within inevitable; its stability, simplicity, and robustness defines a strong corner tothe exceptionally t h e Z h o n g g u a n c u n So f t w a r e P a r k a n d e n s u r e s t h e large c o l l e c t i v floor i t y o f t h e plan, c o mp a n y as . It s well as daylight, bigness, at mx m, defines an interior that works more like a city rather than a ventilation and nature to the interior. b u ild in g .
V IP
1 .4 .
C ts De ne Entrances Slices on the bottom define entrances and creates the appearance of lightness, a floating figure
S are A square was almost inevitable; its stability, simplicity, and robustness defines a strong corner to the Zhongguancun Software Park Ar c h the i t e c collectivity t u r a l C o n c ofe p the t and ensures company. Its bigness, at 180m x 180m, defines an interior that works more like a city rather than a building.
23
1st of international competition 201 Of ce b ilding Concept design to design de elopment
ECEN HEAD UAR ER
2
The Main Lobby is located at 1F in the northeast corner. The northeast corner is highly visible towards the inside of Z-Park and is also somewhat sheltered from the northwest winter wind. The entrance from this side was chosen because vehicle traffic circulation is most efficient from the north. It was also important to create more pleasant pedestrian environment for the south due to its more advantageous exposure in the winter.
- 1 - Ho n e y c o mb p a n e l teel profile T Horizontal rail
FACADE
IN ERIOR S ACE
Facade types:
a.Reflective Cladding e.Transparent IGUs a.Reflective Cladding
7 F 6 F 5F 4 F 3 F 2F
1 F B1 B2 B3
1 .1 0 .
F a ç a d e
d.Horizontal Louvers
与
INT
2
观
c.
1
Reflective Glazing
2
面
与 与 与景观
- 1 - Ho n e y c o mb p a n e l
面 面
teel profile T Horizontal rail
The soffit cuts of the volume are clad in mirror finish tainless teel. The reflectivity o f t h i s ma t e r i a l e mp h a s i z e s t h e p o i n t o f t r a n s i t i o n b e t w e e n e x t e r i o r a n d i n t e r i o r a n d contrasts the more subdued, repetitive pattern of the vertical fins. The fine boundary b e t w e e n b u i l d i n g a n d n a t u r e d i s s o l v e s a s t h e b u i l d i n g s e a ml e s s l y i n t e g r a t e s i t s e l f i n t o t h e s u r r o u n d i n g e n v i r o n me n t . Th e v e g e t a t i o n a n d l a n d s c a p e d u p l i c a t e a s t h e y a r e reflected against the soffit. Because of the high reflectivity of this material, the façade c o n t i n u o u s l y c h a n g e s , p r o j e c t i n g a n i ma g e o f a c t i v i t y b e l o w .
Soffit Detail
3
盖
观
The excavations of the building are emphasized using a material with a similar reflectivity to the soffit areas, making the overall appearance of the building more uniform. In t h e s e a r e a s , h a l f - mi r r o r e d g l a z i n g i s u s e d t o k e e p t h e s a me a p p e a r a n c e f r o m o u t s i d e b u t t o p r o v i d e s o me v i e w s o u t .
300
1
面 面
1
b.Vertical Fins b.Vertical Fins:
面
300
c.Reflective Glazing
offit açades, Reflective Metal Cladding
面
Excavation açades, Reflective Glazing 观
1F Staff Arrival and Main Lobby (Northeast Corner)
3
EX T
P e rfo ra te d
P e rfo ra te d Ex t e r i o r Fi n
DETAIL In t e r i SCALE o r Fi n 1:5 细节 比例 1:5
DETAIL
1 . Ho n e y c o mb p a n e l 蜂窝板
SCALE 1:5
细节 比例
1:5
2. St e e l p r o f i l e T T形钢型材 3. Horizontal rail水平杆
3 F
FACADE LOCATION
N
2F
Floor finish
Concrete slab
DRAFTER
Out of VS-A.HK scope
ARCHITECT :
Waterproofing membrane
Joint sealant and gasket
Mechanical fixing
Block
Insert
Frit
Glass
㜵Ỉ༹ᮦ
ᐦᑒ⬙ 垫片
ᮘᲔᏳ
垫∦
ᥨධ
ᙬ㔙
⋾⍵
TITLE : SUBTITLE :
2011-161
SOFFIT 底面 VERTICAL SECTION 垂直剖面
N° PROJET 项目编号
FACADE
General
FAC ADE
Steel 钢
Stainless steel
Insulation 绝缘
A3
DWG
2012/08/25
DOC UMENT
FORMAT
DATE 日期
SD
P HASE 阶段
LEV EL
Aluminum 铝
锈钢
Excavation Detail Ex c a v a t i o n De t a i l 1 : 5 1
ERI E ER
2
Wood
Various 杂项
01
1
0
DRAWING NUMBER 图纸编号
offit
面
3 1
ᮌ
300
Fins act as a shading device to TT Tencent HQ Beijingthe 腾讯北京总部大楼 eliminate within building. VS-A.HK glare OMA HK Smoke extract through operable opening between glass panes
300
Concrete
INDEX 指引
etail
1
3
2
3
Tencent staff arrive into this space from the staff shuttle bus drop-off immediately to the north. Inside, the Main Lobby is a triple-height triangular space approximately 80m in length on its longest edge. The sloped plane of the cut of the Main Lobby also serves as a shortcut to 2F and 3F (via 1F Staff Arrival andFACADE Main Lobby (Northeast Corner) stairs and an escalator) for a more efficient means of staff to access lower floors. LOCATION 1F
Reflective Glass
Section Perimeter - Step Seatings
DETAIL
Reflective Cladding SCALE 1:5 比例 1:5
细节
1 . Ho n e y c o mb p a n e l 蜂窝板
DETAIL
细节 比例
SCALE 1:5
2. St e e l p r o f i l e T T形钢型材
1:5
40
3. Horizontal rail水平杆
7 2
The staff canteen has a total capacity of 2,842 seats. A kitchen is also located on B1 adjacent the seating area and near a loading dock. The northwest core has a service lift connecting B1 and 1F.
N
Concrete
Floor finish
Concrete slab
VS-A.HK
TT DRAFTER
Out of VS-A.HK scope
Tencent HQ Beijing 腾讯北京总部大楼 ARCHITECT : OMA HK
Waterproofing membrane 㜵Ỉ༹ᮦ
TITLE : SUBTITLE :
1 .8 .6 .
Joint sealant and gasket
Mechanical fixing
ᐦᑒ⬙ 垫片
ᮘᲔᏳ
F o o d
Block
Insert
垫∦
ᥨධ
2011-161
SOFFIT 底面 VERTICAL SECTION 垂直剖面
N° PROJET 项目编号
车
座
Frit
Glass
ᙬ㔙
⋾⍵
FACADE
General
FAC ADE
1 FLEV EL
Steel 钢
SD
P HASE taff Canteen 阶段
Stainless steel 锈钢
Aluminum 铝
Insulation 绝缘
A3
DWG
2012/08/25
DOC UMENT
FORMAT
DATE 日期
Wood ᮌ
01 DRAWING NUMBER 图纸编号
3 1
Various 杂项
0 INDEX 指引
Cafe
座
与 与 s some staff are expected to have breakfast at work immediately after they arrive, the staff canteen is located in the northwest corner on , close to the staff shuttle drop off and main entrance. double height space looks down into the continuation of the staff canteen on B . The staff canteen has a total capacity of , seats. kitchen is also located on B ad acent the seating area and near a loading dock. The northwest core has a service lift connecting B and .
Section Perimeter - Planters
On the th floor, a satellite caf offers an alternative, more small scale option with the possibility to also eat outside on the roof. The satellite caf is connected to the B kitchen via the north core service lift.
ood Core B
itchen taff Canteen
B
Multi unction Banquet Hall
C of
1F
Ro
B
1-
St
af
fC
af
e
an
te
en
B
n te e a n ff C e n c h K it
7F
B
1
Ba
nq
ue
K
itc
t Ha
l
he
n
St a
lo n
Su p e r ma rk e t
or
e
Sa
1 B
7 F 6 F 5F 4 F 3 F 2F
1 F B1 B2 B3
C Ima a f e ge & St
The floor plan is stepped down at its perimeter, creating a slender profile of the floor edge on the fa ade. This also creates a threshold inside the building and differentiated territory at the edge. Along the perimeter, steps, planters, seats, and other sectional articulation provide relief from the typical plan and a moment to look outside.
We
0 20 d i o 2
St u
s te rn
Re
s ta u ra n t
c K it
n h e
B
SEC ION
estern restaurant
1F Staff Canteen
54
5F Typical Office, double height
1st of international competition 201 Of ce b ilding Concept design to design de elopment
ECEN HEAD UAR ER
N
S75
G15
G325
G325 G325
G75
Zhanjiang Bus Station
Chikan District
S374
Site
Haidong New District
S374 G325
G325
S374
e dg Bri ay B ng S081 jia an Zh
S373 rry Fe ar C ng jia an Zh
Finallist of international competition ZHAN IANG 2014, C lt ral comple CU URA CEN ER Concept design ZHANG IANG, RC GFA 1 4,4 1s m
Zhanjiang Airport
Xiashan District
Haibin Pier
Zhanjiang Station
S373
CON E
ANDSCA E Site
As the Cultural Center aims at embracing the region’s cultural heritage, the landscape celebrates the regional’s natural heritage. A complementary selection of four local landscapes is used as inspiration to layout a wide diversity of sensorial experiences for the visitors.
s rie da un bo
1. The “volcanic hills landscape” immerges the Art Village in a lush & refreshing nature. A man-made topography inspired by the smooth lines of the land sculpted by lava provides shelter from the noise coming from the road while these hills fade into dunes as they reach the Western beach. Beach pavillion
2. The “farmland” geometry is used as inspiration for a botanical park in which vegetation is tamed and aligned with the city. Among stretches of colorful plant species in display, sports fields, play areas and picnic pockets invite people to get active and discover new blooms at every visit.
Exercice facilities
Our response aims to deliver on a commitment to bring programs together, bring people together and provide a solution that is representative of the changes Zhanjiang is undergoing, while at the same time introducing generous amounts of natural landscape, a microclimate and usable public spaces.
区 Drop-off
地 Courts & sports facilities 公交站 Bus stop
区 Drop-off
4. The “Mangrove” park offers the experience of Zhanjiang’s original waterfront. It invites wanderers for a fresh and peaceful walk on a folded elevated deck, under the shade of native species, to discover this romantic landscape.
路 Botanical garden allé Fountain
Playground
Sand & concrete terraces
ivic
ax 道 is
集 Marketplace
Exh ib ition 路 allé
Picnic pocket spaces in botanical garden
C
集 Rain water collector
Water mirror
区 Canvas zone
2000 seats
Movable Waterstage Library Lush hills
区 Drop-off
Zhanjiang Museum
山 Volcanic hills landscape Floating terrace
Civic Plaza
道
公 Fresh park
路
Art Allé Lush hills
山 中 Art & Culture Center
Terrace
Art Village
人
集 Art market plaza
allé
Grand Theatre
Sculpture yard
Sky alk
w
路
山 Hills & dunes
Scu lp tu re
Sunset beach
行
Phase 1 of Z-Park is nearly completely, while the masterplan for Phase 2 is nearly finalized. In both phases, the Zhongguancun Software Park planning indicators enforce an overall height limitation, due to the satellite receiving stations in the north. This dictates a low-rise, campus-like urban fabric within the Z-Park. In addition, low maximum site coverage dictates compact buildings and residual open space.
3. The “water fields” landscape is reinterpreted as a collection of basins of different scales and programs celebrating different forms of water. Hosting the Movable Water-stage and the Marine Culture Zone, this part of the shore is kept simple and opened to the view of the Theater from the sea.
New beach
Botanical garden
Canvas zone
Terrace
Tencent’s plot is located at the southwest corner of Phase 2. Initially Tencent acquired 5 plots, however, 4 plots have now been consolidated into a primary plot (P-1) and a satellite plot (T-2), separated by Z-Park Vertical One Road. Baidu and Lenovo have similarly consolidated several plots for their future headquarters located to the north of Tencent.
区 Drop-off
Chilling grass slope
主 Sunken marine themed playground
Light installation
Grassed slope
小 Elevated paths 集 Rain water collector
Greenhouses
人 Arti-stick mangrove
区 Marine Culture Zone
Terrace
Sky mirror
中
道 Boardwalk in mangrove
Mooring area 区 Canvas zone
Aquarium Mangrove landscape View point
中 道 Walk in water
VIP mooring
区 Marine Culture Exhibition
小 Elevated paths
View point
N Marine exploration
0
10
50m
4 Local Landscapes As Inspiration
Whereas Cultural Centers tend to become a single consolidated building or a campus of separate buildings, our proposal for the Zhanjiang Cultural Center aims to offer benefits of both.
Lattice As the most ambitious urban gesture in the proposal, the lattice serves a shading function, providing what is possibly the largest shaded outdoor space in all of Zhanjiang, aiming to transform what could typically be an impractical and exposed condition into one that provides a comfortable outdoor microclimate throughout the day. Public decks on the Lattice provide views over the city and the bay and provide space for special experiences.
Zhanjiang Museum
Library 术 Art Museum
Museum
4 Buildings The Zhanjiang Cultural Center is envisioned first, as a series of separate buildings, each with a distinct design consistent with its function and providing its own identity. However, the design treads middle ground, providing benefits of both separateness and consolidation by clustering the buildings together and introducing a unifying element, a lattice. This strategy allows for continuous physical connection and shared spaces whilst retaining separate identity and operation.
Library
About topography, sculpted by a flow, lush & diversified vegetation, WILD NATURE
About the natural way nature reacts to the water fluctuations of the sea
About geometry, oriented as an extension of settlements, TAMED NATURE
About the artificial way civilisation copes with the water fluctuations for aquaculture
As the landscape initial strategy is to enhance the performance of the architecture in terms of passive cooling and microclimate, this functional relationship between the built and the grown is further detailed in a performing symbiosis. warm air drawn up naturaly
landscape supporting wildlife
Art Museum + Arts and Culture Center
Grand Theater
lattice blocking sun rays
art village
green houses fresh air cooled by nature
aquarium
biomass green waste
manure
localy produced energy to power the art village
CO2 as natural fertilizer in greenhouses
new seeds
rain collector
irrigation
energy production
new plants compost/fertilizer
Heat from combustion
CO2 from combustion
Inspired by 4 local landscapes
2
艺术 Arts and Culture Center
Public Loop Grand Theater
The Lattice supports and covers a bridging network that effectively becomes an extension of the Public Spaces, Foyers and Lobbies within each individual building, becoming a grand, centralized and shared space.
城市 City
艺术村 Art Village
3
1
公众沙滩 Beach
Civic Square 客船码头 Ferry Pier
The programming strategy is characterized by clustering the major buildings together for the sake of a density that enhances accessibility and interaction. At the same time, bringing the buildings together maximizes the landscape around and the public space beneath.
4
Finallist of international competition 2014 C lt ral comple Concept design
ZHAN IANG CU URA CEN ER
GRAND HEA ER
IBRAR
3,252
/
3,252
区
礼品店/餐饮区
Gift Shop / F&B
3,520
Gift Shop / F&B
Lobby/Public
大厅/公共空间
3,520
/公
Lobby/Publi
3,256
3,256
区 Education
教育服务区 Education
3,364
3,364
Bookstore
书店 Bookstore
165
165
Cafe
咖啡厅 Cafe
4,861
/公
线
人
7,438
1,644
区
专
3,556
7,438
2,216
The Theater is the most iconic major program, placed at a strategic location it becomes the Lighthouse at the waterfront. Its volumetric projections in three directions are representative of the three theaters. The theaters share a backstage, which consolidates their back areas but also allows for potential combination of their audiences during a single shared performance.
1,943
区 Collection
3,425
3,370
890
Federation of Art and Literaure
Cultural Complex
1,714
区 Research
中
3,337
Arts Research Center
2,175
公众大厅 Common Lobby
2,832
公区 Office
BOH
BOH
中
1,833
公区 Admin/Office Control Room 536 F&B/Retail 1,123 Basement1,000
25,712
排练厅 Rehearsal Room
Youth Arts Center
1,406
练琴房 Practice Room
区 F&B
1,833
行政/办公区 Admin/Office 控制室 Control Room 536 餐饮区/商店 F&B/Retail 1,123 地下室 Basement1,000
BOH
eaters loading ro te
2 S nt esi e
Drama t eater REGIONAL DRAMA THEATER
1 otal GFA
REGIONAL DRAMA THEATER
+36m
MULTIFORM THEATER
GRAND THEATER
3,343
1,714
储藏区 Collection
科研区 Research
3,337
办公区 Office
2,832
办公区 Office
3,376
3,770
后勤服务室 BOH
后勤服务室 BOH
2 erticali e verticalize
29 500m²
观
Understage MULTIFORM THEATER
ift
Step
4 S ade
eaters combination sc eme
Rehearsal Spaces are strategically placed at ground to allow access to the ground plane, with the possibility of allowing permeable and semi-outdoor rehearsal sessions.
+28m
+20m
mezzanine
lobby
shift
4 ie Observation Deck
view
Waterstage
Opposite to the terraces, each step creates a wide overhang that shades and cools the public plaza below the library. Internally, the terraced spaces allow readers to engage with each other across different thematic reading rooms.
+20m lobby
public bridge +0m
FROM PLAZA
FROM DROPOFF
3,343
储藏区 Collection
+15 m
stage level
ltiform t eater
1,714
学术报告厅 Lecture Hal
1,626
Auditorium
Stage level
Grand t eater
3,842
学术报告厅 Lecture Hall
1F
+36m
GRAND THEATER
Thematic Documents
电子阅览室 E-Reading
32,728
sqm
1 otal GFA
专题文献资料阅览区
1,943
2,920
公区 Office
Practice Room
区/ 地
4,701
多功能厅 Multifunction Hall
The Library’s unique stepping formation allows 7,530 all lev5,000 els of the library active public space 3,376 to engage with 3,770 on all sides. As the reading room climbs, each step creates a generous outdoor terrace with views toward the harbor and the water stage.
1,406
/
3,556
戏剧表演厅
Drama Performance Hall
Calligraphy and Art Institute
Lei Drama Troupe
3,343
区 Collection
Common Lobby
Rehearsal Room
行
1,714
3,343
2,175
公
8,490
区 Admin
Catonese Opera Troupe
Lecture Hall
1,626
Lecture Hall
展览空间 Exhibition
2,880 2,216
区 Education
行
17,087
少儿视障人士借阅区
Children & Accessible Reading
主阅览区 General Reading
1,890 1,000 1,690 1,135 Song & Dance Troupe 1,205
区
Thematic Documents
3,842
4,701
大剧场 Grand Theater
区 Storage
E-Reading
Multifunction Hall
1,644
1,700
区 General Reading
Drama Performance Hall
Lobby/ Public Loop
Exhibition
2,880
主
大厅/公共环线
Exhibition
17,087
Children & Accessible Reading
Grand Theater
4,861
8,750
Lobby/ Public Loop
MULTIFORM THEATER REGIONAL DRAMA THEATER
FROM SUNKEN PLAZA TO MULTIFORM THEATER
FROM LOBBY TO REGIONAL DRAMA THEATER
FROM LOBBY
FROM LOBBY
TO PAID AREA
TO GRAND THEATER
FROM LOBBY GRAND THEATER
1F
4F
5F
6F 10
50
2F
ARER S AGE TO REGIONAL DRAMA THEATER
3F
100m
4F 10
50
5F 100m
Pu b l i c B e a c h
Potential spots for Waterstage
MULTIFORM THEATER GRAND THEATER
W a t e r f r o n t Te r r a c e
LOBBY L ib r a r y R o o f
SUNKEN PLAZA
W a te r fr o n t S e a tin g
上
W a te rfro n t S ta g e
观 AUDIENCE CIRCULATION Ou t d o o r Pe r f o r m a n c e
ARTIST CIRCULATION
Mo o n i n g Ar e a Ma r i n e C u l t u r e Z o n e
观景
V ie w in g D e c k
观景
V ie w in g D e c k
Finallist of international competition 2014 C lt ral comple Concept design
ZHAN IANG CU URA CEN ER
A ICE
USEU 1.Total GFA
2. Linearize
3. Spiral
5.Adaptable Program
4. Ramp
spiral
38 000 m²
+ +
Ramp’s Adaptive Strategies to Programs: Building Flat Plaform on Ramp Easy to Achieve
Example: Exhibition
上
The Public Loop serves as a route throughout the major programs that is accessible to all and selectively allows visual access to the inner workings of functional spaces. In addition, the Public Loop navigates through each building in a manner that is intrinsic to its geometry. Each individual Public Route leads directly up to the bridge level, 20 meters above ground. Here, all major programs are connected in a networked configuration that serves as a Grand Lobby space beneath the lattice.
Break the ramp and insert a plat surface
Example: Lecture Hall
Building Flat Plaform on One End While Sinking the Other, to minimize the height difference from ramp
Example: Collection
U P
The Lattice serves as a connector between the major programs. Once the visitor is on the higher floorlevels, there is no need to go back down, if another program wants to be visited next. The Lattice also provides public accessible viewing decks on top. Each of them offers distinctive programs and diffrent views towards the surrounding.
上
4F
上
U P
U P
The Museum reinterprets what is typically a continuous promenade through a series of gallery spaces by introducing a spiraling typology that retains continuity but dissolves vertical circulation. As such, it introduces a new typology of Museum as a single continuous slab that provides a seamless connection among all programs. Externally, its circular arrangement provides 360 degrees of visual access to the surrounding conditions.
Tea Garden
Sculpture Park
Tea Garden
Sculpture Deck
Viewing Deck Public Loop Grand Terrace
Grand Terrace
partly accesibale programmed surface Peoples Balcony
Peoples Balcony
Zhanjiang Museum Art Museum + City Arts and Culture Center City
Observation Deck Gift Shop Museum Lobby 中
Children & Youth Activity Room
Education
Library reference image
e
ap
sc
nd
La
AR
lightweight structures
Cafe
区 F&B 中 Youth Art Center
nd
La
USEU
AR CU URE CEN ER
pe
a sc
2.Stack
1.Total GFA
3.Slope
4. Access
Grand Theater Lobby
Grand Theater
Observation Deck
stack
Ferry Pier
The Buildings only provide insufficent shading for the civic space
The Lattice provides soft shading between the buildings
courtyard
reference image
Ferry Pier
Sun Shading:
access
The viewing decks on the Lattice are arranged to be in shadow at specific parts of the day Evening
Afternoon
The open structure of the Lattice provides the necessary air flow to achieve a pleasent Microclimate
Mid Day 1F
Hot Air
The Arts & Culture Center consolidates education, art museum and the diverse range of performance troupes, including song & dance, Lei opera and Cantonese opera troupes. These are combined within a courtyard typology that is sliced at ground to minimize its footprint and enhance its permeability.
Morning
Fresh Air
Structure:
m 4 .5
10am
4 .5 m
4F 45 degree angled 12pm
2.0 m
Steel Truss Aluminum Cladding
30 degree angled
60 degree angled
4pm
To provide better shading qualities the lattice elements running form East to West will be angled in between 30 - 60 degrees. The elements running North to south stay perpendicular to the ground
Finallist of international competition 2014 C lt ral comple Concept design
ZHAN IANG CU URA CEN ER
1st P in Competition CATENARY 2012 Spring T O W E R
BEJING, PRC BEIJING CENTER TOWER FLOOR AREA _140,000SQM COLLABORATION WITH Y DESIGN OFFICE SUTHERLAND HUSSEY ARCHITECTS
URBAN SCA E CONCE
Catenar
o er s bea tif l s ape from a gro p consisting of catenar compact mec anical models B controlling t e anc or point and steps in t e n mber of le els and eig t, can form a series of different spatial retic lated s ell s stems After optimi ation, e ent all gained t e perfect combination of arc itect ral forms and mec anical properties Based on e cellent mec anical properties of e terior s in for load bearing s stems, red cing t e central core t be strengt re irements
o er
2 8 8. 0 0
-6 .0 0
b 2
-1 0 .8 0
b 3
-1 4 .3 0
s k y lo ft
s e r v ic e d a p a r tm e n t
3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0
s e r v ic e d a p a r tm e n t
s k y lo ft
30
5 0 0 0
3 5 0 0 0
120
5 0 0 0 5 0 0 0
120
3 6 0 0
120
3 6 0 0
80
3 6 0 0
80
3 6 0 0
80
3 6 0 0
80
3 6 0 0 0
80 80
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
30
4 2 0 0
30
50
4 2 0 0
1 8 0 6 0 0
50
4 2 0 0
50
50
h o te l a m e n itie s
4 2 0 0 4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
30
4 2 0 0
30
30 30 50 50
4 2 0 0 4 2 0 0
5 A o ffic e
120
4 2 0 0
120
120
120
120
5 A o ffic e
2 2
120
4 2 0 0
4 2 0 0 4 2 0 0
2 3
4 2 0 0
4 2 0 0
2 1
80
1 9
5 A o ffic e
80
1 8
4 2 0 0
1 7
80
4 2 0 0
4 2 0 0
80
80
4 2 0 0
4 2 0 0
80
4 2 0 0
8 8 .0 0
1 6 4 2 0 0
r e f u g e /m e c h
4 2 0 0
4 2 0 0
1 4 4 2 0 0 4 2 0 0 4 2 0 0
1 2
4 2 0 0
1 0
4 6 .0 0
4 2 0 0
5 A o ffic e
4 2 0 0 4 2 0 0
4 2 0 0
0 8
floo r
0 7
北 京 中 心
北 京 中 心
4 2 0 0 4 2 0 0 5 0 0 0
ANCHOR-4 STEPS-4
5 0 0 0 2 5 0 0 0
lu tio n &
S H A
lu tio n &
0 1
0 .0 0
b 1
-6 .0 0
b 2
-1 0 .8 0
b 3
-1 4 .3 0
c o m m e r c ia l / r e ta ils
/
ANCHOR-4 / STEPS-4
c o m m e r c ia l / r e ta ils
m a in lo b b y
6 0 0 0
S H A Pa n So
P a n So
2 5
0 2
/
1 0 0 0 0
building a r 1 4 3 0 0
lu tio n &
/
c o m m e r c ia l / r e ta ils
p a r k in g
/ p a r k in g
8 3 0 0
/
floor a r
3 5 0 0
4 2 0 0 4 2 0 0
P a n So
2 6
ANCHOR-4 c o m m e r c ia l / r e ta ils STEPS-4 c o m m e r c ia l / r e ta ils
2 5 .0 0
0 4
building a r
lo b b y
ANCHOR-6 STEPS-4
r e f u g e /m e c h
0 3
0 5
floor floo r ar
5 0 0 0
floor a r ANCHOR-6 STEPS-4 building a r
p a r k in g
4 2 0 0
1 3 0 .0 0
c o m m e r c ia l / r e ta ils
4 2 0 0
ANCHOR-6 STEPS-4 3 0
4 2 0 0
b 1
h o te l a m e n itie s
30 30
1 1 4 0 0 5 0 0 0
50 50 30
5 0 0 0
30 30 50 120 120
5 0 0 0 5 0 0 0 5 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
2 5
p a r k in g
S H A
/
4 2 0 0
o g r a m m a tic d ia g r a m e pside do n, t e anging c ains becoming prig p t r arc es It is a model for a str ct re s pported b catenar e IV - lo t 0 3 nd t e s ape t at a e ible string or c北 ain p nder gra it en t e t o end points are ed en t e c ain settles do n to its nal position e no all t e 京 中 ta 心 es tension in t e c ain is pointing along t e interior of t e c ain itself, not o t ards from it, ot er ise t e c ain 5 A oo f f i ld be mo ing or bending, not at rest In ot er ords, gra it c e as sol ed t e problem of balancing o t all t e forces ic o ld ma e t e c ain bend or mo e, lea ing onl tangential tensile forces 2 4
PROGRAMMATIC DIAGRAM
ELEVATOR SYSTEM DIAGRAM
5 A o ffic e
1 4 3 0 0
2 6
4 2 0 0 2 8 8 0 0 0
BEIJING CENTER
4 2 0 0
0 .0 0
6 0 0 0
0 1
8 3 0 0 3 5 0 0
r e f u g e /m e c h
2 7
parallel
2 7
BEIJING CENTER
e le v a to r s y s te m d ia g r a m angs o er a mirror so oI V - can see t e str ct re lo t 0 3 BEIJING CENTER
2 3
2 2
4 2 0 0
c o r e la y o u t d ia g r a m IV - lo t 0 3
2 1
e le v a to r s y s te m d ia g r a m IV - lo t 0 3
2 0
8 8 .0 0
4 2 0 0
CORE LAYLOUT DIAGRAM
1 9 4 2 0 0
FACADE DIAGRAM
parallel
4 2 0 0
1 4 3 0 0
6 0 0 0
g r o u n d le v e l m a in lo b b y
120
5 0 0 0
3 5 0 0 0
5 A o ffic e 5 A o ffic e
-1 4 .3 0
4 2 0 0
-1 4 .3 0
parallel
floo r
4 2 0 0
-1 0 .8 0
b 3
8 3 0 0 3 5 0 0
s e r v ic e d a p a r tm e n t
s k y lo ft 50 50 120 120 -1 0 .8 0
b 3
5 0 0 0 5 0 0 0
2 5 0 0 0
b 2
1 0 0 0 0
-6 .0 0
30
30
4 2 0 0
2 5 0 0 0
5 0 0 0
-6 .0 0
b 2
6 0 0 0
b 1
5 0 0 0 1 0 0 0 0
0 2
b 1
rotate
2 8
8 3 0 0 3 5 0 0
4 2 0 0
2 5 .0 0
5 0 0 0
5 0 0 0
0 .0 0
0 3
0 .0 0
rotate
2 9
0 1
0 4
0 1
r e f u g e /m e c h
s k y lo b b y
1 3 0 .0 0
0 6
1 0 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0
5 0 0 0
0 6
0 2
1 7 2 .0 0
3 1
1 8 0 6 0 0
4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0
0 7 2 5 .0 0
0 5
3 0
0 9
4 6 .0 0
0 8
g r o u n d le v e l m a in lo b b y
3 1
ANCHOR-6 STEPS-6 STEPS-6
2 8
3 2 2 5 .0 0
0 2
0 9
4 2 0 0
30 30
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0
1 0
0 3
3 3
S H PA a Pn a S n S o l o u l ut i to i o n n && S S H H A A
ANCHOR-6 STEPS-6
1 1
0 3
1 1
0 4
lu tio n &
3 3
0 4
4 6 .0 0
0 6
h o te l a m e n itie s 3 2
P a n So
ANCHOR-6
5 A o ffic e
3 5
3 4
1 3
0 7
1 7 2 .0 0
3 6
3 5
4 2 0 0 4 2 0 0
0 5
1 4
0 8
r e f u g e /m e c h
3 7
building a r
0 6
1 5
4 2 0 0
4 2 0 0 4 2 0 0
4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
1 6
s k y lo b b y
1 3
4 6 .0 0
0 7
1 7
0 9
h o te l a m e n itie s
3 4
3 7
ry &floo rs
0 8
1 8
O P E N A R T IU M
h o te l a m e n itie s
s e r v ic e d a p a r tm e n t
1 5
0 9
1 2
0 5
ry
1 9
b a s e m e n t le v e ls
2 0 5 .6 0
h o te l a m e n itie s
3 8
ry &floo 30 rs rotate
ry ry &floo rs
5 0 0 0
4 2 0 0
ogoda
1 3
floor a r
building a r
2 0
5 0 0 0
1 4
4 0
3 6
4 2 0 0
4 2 0 0
4 2 0 0
1 5
4 8
8 8 .0 0
4 2 0 0
/
4 2 0 0
1 6
re fu g e /m e c h
1 0 2 0
ry
re
1 1 2 1
4 2 0 0
4 2 0 0 4 2 0 0
1 7
re
1 2
2 2
4 2 0 0
4 2 0 0
Ne
C O R E L O A D T R A N S F E R IN G
2 3
OFFICE HIGHT ZONE OFFICE MIDDLE ZONE center OFFICE LOW ZONE o ffic e h ig h z o n e f f i c e m i d d l e z o n SKYLOBBY e 中 EXPRESS oHOTEL o ffic e lo w z o n e HIGHT-SPEED e x p r e s s h o t eEXPRESS l s k y lo b b y h ig h - s p e e d e x p r e s s FIRE/SVERICE fir e / s e r v ic e
2 1 2 .8 0
4 9
3 8
floor a r
building a r
3 9
re
1 3
4 2 0 0
8 8 .0 0
4 2 0 0
2 0
1 8
5 0
2 9
4 2 0 0
4 2 0 0 4 2 0 0
2 1
1 9
2 0 5 .6 0
4 0 8 8 .0 0
4 2 0 0
80 80
4 2 0 0
4 2 0 0
2 4
5 1
3 9
ANCHOR-6 ANCHOR-6 floor a r STEPS-5 STEPS-5
ANCHOR-6 STEPS-5
4 1
1 4
2 5
2 2
4 8
1 5
2 6
4 2 0 0
4 2 0 0
b a s e m e n t le v e ls
2 3
4 9
4 2 0 0
1 8 0 6 0 0
50 50 120 120
120 120
4 2 0 0 4 2 0 0 4 2 0 0
1 8 0 6 0 0
4 2 0 0
2 4
5 2
4 1
floo r
4 3
1 6
2 7
s k y g a r d e n / o b s e r v a tio n 中 SKY GARDEN s g r k a m y PARALLEL c l u b HOUSE h o u s e 中 ROTATE 30 SKYps kr oCLUB y g a r d e n / o b s e r v a tio n / 中 y s c k l u yb h l o o u f s t e 中 SKYss kk LOFT y lo ft e n t s e r s v i ce e rd v a p i c a r e t m d e APARTMENT n ta p a r t m SERVICED lo b b y / ROTATE PARALLEL 30 PARALLEL lo b b y / LOBBY re fu g e /m e c h / o ffic e re fu g e /m e c h / REFUGE p o d iu m r o o f g a r d e n h o to e l f a f m i c e ne i t i e s OFFICE c o m m e r c ia l / r e ta ils / p o d i u m r o o f g a r d e n c a f e / r e s t a u r a n t / PODIUM ROOF GRADEN p a r k in g h o t e AMENITIES l a m e n itie s HOTEL c o m m e r c ia l / r e ta ils / COMMERICAL c a fe / re s ta u ra n t / CAFE/RESTAURANT p a r k in g PARKING
2 4
1 7
4 2 0 0
o er
3 6 0 0
3 6 0 0 3 6 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
30 30
30 30 50 50
4 2 0 0
80 80
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
Catenar
floo r 2 1 2 .8 0
5 0
4 4
1 8
2 8
2 5
floo r 5 1
4 2
1 9
1 3 0 .0 0
2 9
1 0
4 2 0 0
1 8
1 7 4 2 0 0
Gra it is applied to optimi e t e c r es
4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0
2 0
5 3
4 2
5 2
2 1
3 2
3 0
O P E N A R T IU M
2 6 4 2 0 0
1 8 0 6 0 0
3 3
s e r v ic e d a p a r tm e n t
5 4
4 3
4 5
2 2
3 1
2 7
5 3
2 6
2 3
4 2 0 0
laned
1 3 0 .0 0
2 8
1 4 3 0 0
2 7
4 2 0 0
/
5 5
4 4
4 2 0 0
3 6 0 0 4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
re fu g e /m e c h
5 6
4 5
2 4
3 4
2 4 1 .6 0
5 7
4 6
5 4
1 3 0 .0 0
2 5
OFFICE HIGHT ZONE OFFICE MIDDLE ZONE 0m to er OFFICE LOW ZONE o ffic e h ig h z o n e f f i c e m i d d l e z o n SKYLOBBY e 中 EXPRESS oHOTEL o ffic e lo w z o n e HIGHT-SPEED e x p r e s s h o t eEXPRESS l s k y lo b b y h ig h - s p e e d e x p r e s s FIRE/SVERICE fir e / s e r v ic e
s k y lo ft
4 7
5 5
2 8
1 7 2 .0 0
3 8
4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0
C O R E L O A D T R A N S F E R IN G
parallel
4 6
2 9
3 5
2 9
2 5 0 0 0
3 0
3 6
3 3
parallel
4 7
3 1
3 7
1 1
Catenar c r e ines are stac ed
3 3
3 2
4 0
3 1
g r o u n d le v e l
3 4
3 9
h o te l s k y lo b b y
3 7
3 2
o re e catenar model in ented b reno ned Spanis arc itect G adi c In p c o r esics and geometr , catenar anded freel from t o fi ed points is t e c r e it perfectl fle ible b t not capable of being stretc ed It forms a tension str ct re en o ipped a series of catenaries anging step b step, o get a self s pporting str ct re s stem consists of arc es ere comes t e concept of t e catenar to er
2 0 5 .6 0
4 1
3 8
c o re
4 8
4 2
3 9
30
3 5
4 9
1 7 2 .0 0
1 2
c o re
3 6
2 1 2 .8 0
4 3
4 1
3 0
AIN O ER CONCE
5 0
4 4
4 2
3 4
e site located at t e nction of e ri ers, incl ded ing ang Canal, t e longest canal in C ina and ong i Ri er, t e most important canal in Bei ing ere is an old pogoda on t e so t east of t e nction, ic pla s signi cant role in feng s i pattern e pogoda c o re c o re is considered as a feng s i to er to stop ri er disaster Ho e er t e planed 0m to er on t e east dist rbs t e original pattern, mo ing t e c o re c o re center to t e east In order to eep t e center in t e original place, e s ggested a triangle distrib tion it t e geometrical center still on so t east of t e ri er nction, ic is consisted of t ree to ers incl ded t e pogoda, planed 0 to er on t e est and a 2 0m to er in o r site v e lb 2 0 ildings In term of an element introd ced to regress t e balance in Fengs i, a gro pl e of leaded b a main to er is s ggested instead of se en niformed ones
3 7
5 1
4 2 0 0
4 2 0 0
4 3
le v e l 4 0
5 2
4 6
3 5
i
3 8
4 7
/
3 6
Ideal Feng S
5 3
4 5
4 0
1 7 2 .0 0
3 9
5 4
4 2 0 0
re fu g e /m e c h
4 0
5 5
2 8 8 0 0 0
4 2 0 0 4 2 0 0
4 4
4 1
5 6
4 2 0 0
4 2 0 0
C O R E L O A D T R A N S F E R IN G
4 5
rotate
4 2 0 0
2 0 5 .6 0
5 7
4 2 0 0
4 8
4 2
2 4 1 .6 0
2 5 1 .6 0
lo b b y
3 6 0 0
4 9
6 0
5 6
4 2 0 0
2 1 2 .8 0 3 6 0 0
5 0
4 6
c o re
4 3
4 2 0 0
3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 0
3 6 0 0
h o te l s k y lo b b y
3 6 0 0
5 1
5 8
s k y lo ft
6 1
parallel
2 4 1 .6 0
中
FLOORS ROTATE 30
6 2
p a r k in g
fir e / s e r v ic e
30
5 7
c o m m e r c ia l / r e ta ils
h ig h - s p e e d e x p r e s s
5 2
ry &floo rotate 30 rs
ry ry &floo rs
3 6 0 0 0
h o te l s k y lo b b y
5 3
ry
4 2 0 0
lo w z o n e s e r v ic e d a p a r tm e n t
5 4
re
2 0 5 .6 0
4 2 0 0
5 0 0 0
5 5
4 8
4 4
2 5 1 .6 0
5 0 0 0
h ig h z o n e s e r v ic e d a p a r tm e n t
3 6 0 0
3 6 0 0 3 6 0 0 3 6 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0
s k y lo ft
5 6
re
2 1 2 .8 0
4 9
4 5
5 9
4 7
Catenar to er is located in t e central b siness district of ong o District It is one of t e main de elopment area in Bei ing post ol mpic area is design of 2 m to er attempts to creat a ne minimalist rban image Based on a perfect mec anical model, t e to er ses t e form of a caten to e press t e e terior c o re c o re facade con e and t e main str ct re s stem is is a mi ed se b ilding, incl ding rental office, ser ice apartment, otel and some commercial facilities c o re
2 4 1 .6 0
4 2 0 0
le v e l 5 0
6 0
5 7
5 0
4 6
5 0 0 0
5 0 0 0 5 0 0 0
c o re
3 6 0 0
c o re
3 6 0 0
3 6 0 0
5 8
rotate
5 8
s k y c lu b h o u s e
6 3
5 9
ry &floo rs
2 7 6 .6 0
e
6 4
5 1
4 7
6 2
C O R E L O A D T R A N S F E R IN G
ry
h o te l a m e n itie s
3 6 0 0 3 6 0 0 3 6 0 0 0 3 6 0 0 3 6 0 0
80 80
3 6 0 0
1 1 4 0 0 5 0 0 0 5 0 0 0
6 3
6 1
5 9
re
5 2
s e r v ic e d a p a r tm e n t
2 5 1 .6 0
5 3
80 80
6 0
2 7 6 .6 0
6 4
5 4
6 5
5 8
2 5 1 .6 0
6 0
h o te l a m e n itie s
5 0 0 0
6 1
2 8 1 .6 0
6 5
5 5
4 2 0 0
5 0 0 0
3 5 0 0 0
6 2
6 6
5 0 0 0
5 0 0 0 5 0 0 0
6 3
5 0 0 0
2 7 6 .6 0
6 4
2 8 0 .0 0
3 5 0 0 0
1 1 4 0 0
SKYLOFT HIGHT ZONE SERVICED APARTMENT LOW ZONEE SERVICED APARTMENT HOTEL SKY LOBBY HIGHT-SPEED EXPRESS FIRE/SVERICE
2 8 1 .6 0
5 0 0 0
6 5
3 6 0 0
fir e / s e r v ic e
2 8 0 .0 0
6 6
80 80
h ig h - s p e e d e x p r e s s
5 6
2 8 1 .6 0
5 9
2 4 1 .6 0
5 7
80 80
3 6 0 0 3 6 0 0
z o n e s e r v ic e d a p a r tm e n t
h o te l s k y lo b b y
120 120
5 8
120 120
lo w
6 6
MAIN MAIN& MAIN& FLOORS STRUCTURE SECONDARY SECONDARY
6 1
5 0 0 0
h ig h z o n e s e r v ic e d a p a r tm e n t
c o re
50 50 5 9
s k y lo ft
c o re
6 2
2 5 1 .6 0
5 0 0 0
ogoda
6 0
5 0 0 0
120 120
5 0 0 0
50 50
6 1
MAIN STRUCTURE
50
s k y lo ft
6 3
5 0 0 0
3 5 0 0 0
30 30
6 2
5 0 0 0
5 0 0 0
50 50
5 0 0 0
0m to er
30 30
laned
MAIN& FLOORS 中 o b s e r v a tio n d e c k / s k y g a r d e n SECONDARY
5 0 0 0
6 4
6 3
50
2 7 6 .6 0
6 4
50
6 5
2 7 6 .6 0
6 5
MAIN s k y c lu b h o u s STRUCTURE 2 8 8. 0 0
5 0 0 0
1 1 4 0 0
30 30
2 8 1 .6 0
5 0 0 0
6 6
p ro g ra m
o b s e r v a tio n d e c k / s k y g a r d e n
2 8 1 .6 0
6 6
2 8 0 .0 0
5 0 0 0
1 1 4 0 0
SKYLOFT MAIN MAIN& FLOORS HIGHT ZONE SERVICED APARTMENTSTRUCTURE SECONDARY ROTATE 30 PARALLEL LOW ZONEE SERVICED APARTMENT HOTEL SKY LOBBY MAIN MAIN MAIN& MAIN& FLOORS FLOORS ROTATE 30 ROTATE PARALLEL 30 PARALLEL STRUCTURE STRUCTURE SECONDARY SECONDARY HIGHT-SPEED EXPRESS FIRE/SVERICE
BEIJING CENTER
1 6
r e f u g e /m e c h
4 2 0 0
北 京 中 心
4 2 0 0
1 5
4 2 0 0
Flipped c r es become t e main str ct res
4 2 0 0
1 3
4 2 0 0
1 2
1 1 4 2 0 0
e c r es are ipped
1 4
4 6 .0 0
5 A o ffic e
4 2 0 0
1 0
4 2 0 0
0 9
0 8 4 2 0 0
CONCEPT FACADE
4 2 0 0
0 7
4 2 0 0
0 6
0 5
2 5 .0 0
5 0 0 0
CATENARY STRUCTURES
c o m m e r c ia l / r e ta ils
/
0 3
c o m m e r c ia l / r e ta ils
/
0 2
c o m m e r c ia l / r e ta ils
/
5 0 0 0 1 0 0 0 0
2 5 0 0 0
5 0 0 0
0 4
0 .0 0
b 1
-6 .0 0
b 2
-1 0 .8 0
0 CATENARY STRUCTURES
Catenar str ct res
SUN-SHADING SYSTEM
S n s ading s stem
GLASS FACADE
Glass facade
3 6
20TH FLOOR(66M)-TYPICAL OFFICE
12M
0
FLOOR PLATES
Floor plates
2012 Spring
CATENARY T O W E R
3 6
12M
50TH FLOOR(212M)-TYPICAL APARTMENT
50TH FLOOR(212M)-TYPICAL APARTMENT 0
3 6
12M
c o m m e r c ia l / r e ta ils
60TH FLOOR(251M)-TYPICAL SKYLOFT b 3
p a r k in g
/
-1 4 .3 0
0
3 6
p a r k in g
12M
p r o g r a m m a tic d ia g r a m IV - lo t 0 3
CATENARY CATENARY CATENARY T O WRW E ER R T O WT E O
1st Pri e in Competition
1st Pri e in Competition 2012 Spring i ed use
CATENARY T O W E R
/
p a r k in g
8 3 0 0 3 5 0 0
1 4 3 0 0
GROUND FLOOR-ENTRANCE
c o m m e r c ia l / r e ta ils
m a in lo b b y
6 0 0 0
0 1
1st Prize in1st Competition Prize in Competition 2012 Spring 2012 Spring 2012 Spring i ed use Mixed-use Mixed-use
/
3 6 0 0 3 6 0 0
4 9 2 0 5 .6 0
4 8
4 2 0 0
le v e l 5 0
4 7 4 2 0 0
C O R E L O A D T R A N S F E R IN G
4 2 0 0
4 6
4 5 4 2 0 0
re fu g e /m e c h
/
4 2 0 0
4 4
4 2 0 0
4 3
4 2 0 0
4 2
4 1 4 2 0 0
c o re
1 7 2 .0 0
4 0 4 2 0 0
c o re
3 9 4 2 0 0
FACADE DE AI S
3 8
c o re
4 2 0 0
2 8 8. 0 0
p ro g ra m
s k y lo ft
s k y lo ft
5 0 0 0
1 1 4 0 0 5 0 0 0
5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0
3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0
3 6 0 0 0
3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
/
0 7
4 2 0 0
0 6
0 5
r e f u g e /m e c h
c o m m e r c ia l / r e ta ils /
/
0 4 5 0 0 0
2 5 .0 0
0 3 2 5 0 0 0
0 2
/
5 0 0 0
2 5 .0 0
5 0 0 0
/
c o m m e r c ia l / r e ta ils
5 A o ffic e
4 2 0 0
/
c o m m e r c ia l / r e ta ils
0 8
5 0 0 0
4 2 0 0 4 2 0 0 5 0 0 0
4 2 0 0
1 8 0 6 0 0
4 2 0 0 4 2 0 0 4 2 0 0
1 8 0 6 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
c o m m e r c ia l / r e ta ils
/
4 2 0 0
4 2 0 0
1 4 3 0 0
1 0 0 0 0
lo b b y
6 0 0 0
0 .0 0
m a in lo b b y -6 .0 0
b 2
-1 0 .8 0
b 3
-1 4 .3 0
c o m m e r c ia l / r e ta ils
/
8 3 0 0 3 5 0 0
p a r k in g
1 4 3 0 0
-6 .0 0
0 1
b 1 8 3 0 0
b 1
6 0 0 0
0 .0 0
3 5 0 0
1 0 0 0 0
lo b b y
0 1
p a r k in g
5 0 0 0
2 5 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0
/
4 2 0 0
s k y lo ft
5 0 0 0
3 6 0 0 3 6 0 0 3 6 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0
5 A o ffic e 4 2 0 0
5 A o ffic e
4 2 0 0 4 2 0 0
4 2 0 0
c o m m e r c ia l / r e ta ils
c o m m e r c ia l / r e ta ils
0 2
4 2 0 0
1 8 0 6 0 0
m e r c ia l / r e ta ils
4 6 .0 0
0 9
/
/
0 3
2 6
4 2 0 0
5 0 0 0
5 0 0 0
h o te l a m e n itie s
3 5 0 0 0
s e r v ic e d a p a r tm e n t
5 0 0 0
3 5 0 0 0
5 0 0 0 5 0 0 0 5 0 0 0
3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0
3 6 0 0 0 3 6 0 0 3 6 0 0
3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0
1 1 4 0 0
s e r v ic e d a p a r tm e n t
s k y lo ft
s e r v ic e d a p a r tm e n t
h o te l a m e n itie s
5 0 0 0
3 6 0 0
3 6 0 0
1 1 4 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0
1 1 4 0 0
5 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0
3 6 0 0 0
3 6 0 0
4 2 0 0
5 0 0 0 5 0 0 0
s e r v ic e d a p a r tm e n t
3 6 0 0 3 6 0 0
3 6 0 0 0 3 6 0 0 3 6 0 0
h o te l a m e n itie s
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0
1 0
c o m m e r c ia l / r e ta ils
4 6 .0 0
c o m m e r c ia l / r e ta ils
b 2
-1 0 .8 0
b 3
-1 4 .3 0
1st Pri e in Competition
CATENARY
p ro g r
4 2 0 0
4 2 0 0
4 2 0 0
2 2
4 2 0 0 4 2 0 0
2 0
4 2 0 0
1 9
1 8 4 2 0 0
4 2 0 0
1 7
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
1 5
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
4 2 0 0
0 7 4 2 0 0
4 2 0 0
0 6 4 2 0 0
/
0 3
c o m m e r c ia l / r e ta ils
/
5 0 0 0 5 0 0 0 2 5 0 0 0
5 0 0 0
5 0 0 0
4 2 0 0
/
c o m m e r c ia l / r e ta ils
2 5 .0 0
0 2
5 0 0 0
c o m m e r c ia l / r e ta ils
1 0 0 0 0
m a i n l o b b0 2 y
0 1
0 1
0 .0 0
b 1
-6 .0 0
b 2
-1 0 .8 0
b 3
-1 4 .3 0
b 1 1 4 3 0 0
6 0 0 0
p a r k in g p a r k in g
m a i m a in lo b b y
6 0 0 0
1 0 0 0 0
p a r k in g
/
/
0 .0 0
-6 .0 0
8 3 0 0
2 5 0 0 0
c o m m e r c ia l / r e ta ils
0 4
0 5 2 5 .0 0
5 0 0 0
5 0 0 0
5 A o ffic e
0 8
0 4
1 0 0 0 0
5 A
0 9
4 2 0 0
5 0 0 0 5 0 0 0
0 5
6 0 0 0
4 6 .0 0
4 2 0 0
4 2 0 0
4 2 0 0 4 2 0 0
1 0 4 6 .0 0
0 6
-1 0 .8 0
r e f u g e /m e c h
1 1
0 7
c o m m e r c ia l / r e ta ils
12M
1 2
0 8
0 .0 0
3 6
1 3
0 9
2 5 .0 0
0 1 4
1 1
1 0
b 2
50TH FLOOR(2
1 6
1 2
5 A o ffic e
-6 .0 0
8 8 .0 0
4 2 0 0
8 8 .0 0
1 3 4 6 .0 0
b 1
5 A o ffic e
2 1
1 4
4 2 0 0 4 2 0 0
1 1
2 3
1 5
4 2 0 0 4 2 0 0
1 2
p a r k i n 0 g4
p a r k in g
2 4
r e f u g e /m e c h
8 3 0 0 3 5 0 0
2 7
r e f u g e /m
1 3
0 7
p a r k in g p a r k in g
5 A
1 6
1 4
0 8
/
8 8 .0 0
1 5
0 9
2 8
5 A o ffic e
1 7
5 A o ffic e
1 0
4 2 0 0
3
0 3
1 4 3 0 0
2 0
1 8
1 1
2 5
4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
12M
0 2
12M
5 0 0 0
3 5 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0
g r a m m a tic d ia g r a m d ia g r a m - lo t 0 3
1 6
0 3
3 6
5 0 0 0
4 2 0 0 4 2 0 0
s e r v ic e d a p a r tm e n t
4 2 0 0 4 2 0 0 4 2 0 0
12M
1 7
0 4
0
2 1
8 8 .0 0
20TH FLOOR(66M)-TYPICAL OFFICE
0 6
12M
5 0 0 0
s k y lo ft 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 4 2 0 0
s k y lo ft
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0
1 8 0 6 0 0
3 6
1 8
0 7
3 6
2 2
1 9
1 2
0 5
2 6
2 3
1 3
5 A o f f i c c eo m
3 5 0 0
4 2 0 0
0
4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0
2 0
0 8
0
2 7
1 6
1 3 0 .0 0
re fu g e
2 8
1 4
m a in lo b b y
1 3 0 .0 0
2 9
2 4
p a r k in g
1 9
0 1
3 0
2 5
PROGRAMMATIC DIAGRAM d ia g r a m
4 2 0 0
1 7
0 5
3 1
r e f u g e /m e c h
1 9
p a r k in g
2 4
8 8 .0 0
0 9
c o m m e r c ia l / r e ta ils
c o m m e r c ia l / r e ta ils
/
p
3 5 0 0
8 3 0 0
-1 4 .3 0
1 4 3 0 0
p a r k in g 50TH FLOOR(212M)-TYPICAL APARTMENT 60TH FLOOR(251M)-TYPICAL SKYLOFT 50TH FLOOR(212M)-TYPICAL APARTMENT 50TH FLOOR(212M)-TYPICAL APARTMENT 60TH FLOOR(251M)-TYPICAL SKYLOFT p a r k i n g 12M FLOOR(212M)-TYPICAL APARTMENT 0 3 6 12M 20TH FLOOR(66M)-TYPICAL OFFICE 0 3 6 50TH 60TH FLOOR(251M)-TYPICAL SKYLOFT 0 3 6 12M p r o g r a m m a 0t i c 3 d 6i a g r a12M m 0 3 6 12M 0 3 6 12M 0 3 6 12Mp r o g r a m m a t i c d i a g r a m IV - lo t 0 3 p r o g r a m m a tic d ia g r a m b 3
3 5 0 0
20TH FLOOR(66M)-TYPICAL OFFICE
4 2 0 0
1 8 0 6 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
h o te l a m e n itie s
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 5 0 0 0 5 0 0 0 6 0 0 0
1 4 3 0 0
2 8 8 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
3 5 0 0
1 3 0
-1 0 .8 0
p ro p r o g r a m m 2 7a t i c IV IV - lo t 0 3 2 6 e le v a to r s y s te m 2 5 5 A oI V f f i c- e l o t 0
1 1
GROUND FLOOR-ENTRANCE
8 3 0 0 3 5 0 0
5 A o ffic e
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0 5 0 0 0 5 0 0 0
2 8 8 0 0 0
6 0 0 0
4 2 0 0
-6 .0 0
2 8
1 8
1 0
3 3
3 2
2 9
1 8
3 0
2 1
1 3
h o te l a m e n itie
1 3 0 .0 0
3 0
2 0
m a in lo b b y c o m m e r c ia l / r e ta ils .0 0 2 9 c o m m e r c ia l / r e ta ils /
2 9
1 2
12M
5 0 0 0
2 5 0 0 0
1 0 0 0 0
/ lo b b y p a r k in g
c o m m e r c ia l / r e ta ils
4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0
5 A o ffic e
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
0 .0 0
2 2
1 4
3 4
/
p a r k in g
3 4
2 1
3 1
4 2 0 0
-1 4 .3 0
c o m m e r c ia l / r e ta ils
5 A o ffic e
3 5
2 2
3 2
re fu g e
1 7 2 .0 0
3 6
2 3
3 3
s k y lo b b
h o te l a m e n itie
1 5
-1 4 .3 0
b 3
4 2 0 0
-1 0 .8 0
b 3
-1 4 .3 0
/ /
2 6
5 0 0 0
2 5 0 0 0
1 0 0 0 0
b 2
1 4 3 0 0
6 0 0 0 -6 .0 0
b 3
c o m m e r c ia l / r e ta ils c o m m e r c ia l / r e ta ils
2 5
3 4
3 0
b 2 -1 0 .8 0
3 7
/
2 7
5 A o ffic e
s e rv i
3 8
c o m m e r c ia l / r e ta ils
2 8
r e f u g e /m e c h
2 0 5 .6 0
3 9 1 7 2 .0 0
CORE LAYLOUT DIAGRAM
3 5
2 5 .0 0
4 8
4 0
3 1
1 7 2 .0 0
2 1 2 .8 0
4 9
4 1
1 7
r 3e 4 f u g e / m e c h
5 0
4 2
3 2
5 A o ffic e
s e r v ic e d a p a r tm
5 1
4 3
h o te l a m e n itie s
3 9
3 6
5 2
4 4
3 3
3 7
5 A o ffic e
5 3
4 5
p a r k in g
3 8
4 6 .0 0
5 4
h o te l a m e n itie s
PROGRAMMATIC DIAGRAM s k y lo b b y
4 0
r e f u g e /m e c h
5 5
4 6
s e r v ic e d a p a r tm e n t
3 5
p a r k in g
5 6
h o te l a m e n itie s
2 4
4 1
3 1
b 1
8 3 0 0
1 4 3 0 0
b 1
5 0 0 0
4 2 0 0
5 0 0 0
4 2 0 0 4 2 0 0
54 2 0 0 0 0 0 4 2 0 0
5 40 2 00 0 0 4 2 0 0
5 0 4 0 2 00 0
3 5 0 0 0
4 2 0 0 0 0
5 0 0 4 02 4 2 0 0 2 0 0
5 0 0 04 4 2 0 0 4 2 0 0
5 0 0 0
4 2 0 0 2 0 0
3 6 0 04 4 2 0 0
3 64 2 0 0 0 0 4 2 0 0
3 6 0 0
4 2 0 0
3 65 0 0 0 0 0 0 0 0
3 6 0 50 5 0 0 0
2 5 0 0 0
3 6 0 0 0
3 6 0 0 0 0 0 0
3 6 0 01 3 6 6 0 0 00 0 1 4 3 0 0
3 6 0 08 3 5 0 0
3 6 0 0 4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 5 0 0 0
5 0 0 0
1 0 0 0 0
-6 .0 0
2 0 5 .6 0
4 8
2 4 1 .6 0
5 7
4 7
0 6
0 1
b 2
4 9
h o te l a m e n itie s
/
4 1
3 2
b 1
2 1 2 .8 0
5 0
3 6
m a in lo b b y c o m m e r c ia l / r e ta ils
4 2
3 3
5 0 0 0
2 5 0 0 0
0 2
0 3
0 .0 0
5 1
3 7
4 3
5 A o ffic e
1 7 2 .0 0
5 2
3 8
p4 5r o g r a m m a t i c d i a g r a m IV - lo t 0 3 4 4
4 2
O P E N A R T IU M
4 0
2 0 5 .6 0
2 5 1 .6 0
IV - lo 2012 Spring p r o g r a m m a tic d ia g r a m ELEVATOR SYSTEM DIAGRAM W E R i ed I use V - lT o t 0O 3 5 A PROGRAMMA ELEVATOR SYSTEM DIAGRAM
1 5
3 6
-1 4 .3 0
60TH FLOOR(251M)-TYPICAL SKYLOFT
e le v a to r s y s te m d ia g r a m IV - lo t 0 3
GROUND FLOOR-ENTRANCE
0
-1 0 .8 0
b 3
8 8 .0 0
5 3
4 1
-6 .0 0
b 2
3 5
0 4
1 6
GROUND FLOOR-ENTRANCE
5 0 0 0
3 5 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0
1 1 4 4 20 0 0 0 4 2 0 0
1 8 0 6 0 0
4 2 0 0
5 0 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
b 1
5 4
3 9
4 7
0 .0 0
0 1
5 A o ffic e
c o r e l a y o u t d i a g 4 r6 a m IV - lo t 0 3
3 6
0 5
0 1
h o te l a m e n itie s
4 2 0 0
1 1 4 0 0
4 2 0 0 4 2 0 0
2 8 8 0 0 0
5 0 0 0
4 2 0 0
5 0 0 0
4 2 0 0
s k y lo ft
5 0 0 0 5 0 0 0
3 5 0 0 0
5 0 0 0 5 0 0 0
s e r v ic e d a p a r tm e n t
3 6 0 0 3 6 0 0 3 6 0 0
3 6 0 0
h o te l a m e n itie s
3 6 0 0
s k y lo ft
3 6 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 4 2 0 0 4 2 0 0
s e r v ic e d a p a r tm e n t
4 2 0 0 4 2 0 0
5 A o ffic e
4 2 0 0 4 2 0 0
h o te l a m e n itie s
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
1 8 0 6 0 0
2 0 5 .6 0
r e f u g e /m e c h
5 5
4 5
2 1 2 .8 0
r e f u g e /m e c h
4 9 4 8
3 7
0 6
2 5 .0 0
5 0 0 0
4 2 0 0 4 2 0 0
4 8
0 2
5 6
4 2
0 7
1 9
2 5 0 0 0
r e f u g e /m e c h 0 3
s k y lo b b y
0 9
5 0 0 0
2 5 0 0 0
1 0 0 0 0
0 .0 0
6 0 0 0 1 4 3 0 0
-1 4 .3 0
0 2
8 3 0 0 3 5 0 0
-1 0 .8 0
4 9
3 8
0 8
0 3 2 5 .0 0
5 0 0 0
/ lo b b y
0 4
1 3 0 .0 0
5 1 5 0
2 5 .0 0
0 5
2 3
2 0
3 6
2 1 2 .8 0
3 9
1 0
4 6 .0 0
0 4
2 3
2 1
0
0 7
0 6
4 2 0 0
4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
0 5
0 2
p a r k in g
c o m m e r c ia l / r e ta ils
-6 .0 0
1 1
0 6
4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 5 0 0 0 5 0 0 0
0 .0 0
5 0
5 7
4 3
1 2
0 7
4 6 .0 0
0 3
1 0 0 0 0
-1 4 .3 0
0 8
5 1
4 0
1 3
0 8
8 3 0 0
-1 0 .8 0
0 9
0 1
2 4 1 .6 0
4 4
5 2
4 6 .0 0
1 0
b 1
1 4
0 9
0 8
r e f u g e /m e c h
1 2
1 1
6 0
5 8
4 6
1 3
3 0 0
1 1 4 0 0 5 0 0 0 5 0 0 0 5 0 0 0 3 5 0 0 0
5 0 0 0 5 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
1 8 0 6 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0
1 8 0 6 0 0
4 2 0 0 4 2 0 0 4 2 0 0
1 8 0 6 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
1 0
0 6
b 3
1 5
1 1
0 7
b 2
1 4
6 1
4 7
5 A o ffic e
5 3
1 5
5 2
1 6
1 2
0 9
5 4
1 8
5 A o ffic e
4 3
1 7
1 3
1 1
5 5 8 8 .0 0
2 0
5 3
b 3
5 A o ffic e
2 1
1 9
0 2
5 A o ffic e
1 4
1 2
-6 .0 0
2 2
0 3
b 2
5 6
2 3
2 5 .0 0
5 4
4 4
1 8
1 5
1 4
6 0 0 0
b 1
5 6
2 4
4 5
2 0
1 6
1 5
5 0 0 0
2 5 0 0 0
8 8 .0 0
1 6
12M
r e f u g e /m e c h
5 7
5 5
5 7
2 6
r e f u g e /m e c h
r e f u 2 g 4 1e . 6 / m 0 e c h
5 8
4 6
8 8 .0 0
1 9
1 7
3 6
5 8
s k y lo b b y
1 3 0 .0 0
2 8
2 7
2 7 6 .6 0
5 9
2 5 1 .6 0
5 9
1 9 2 0
1 8
0
3 1
s k y lo b b y
2 4 1 .6 0
4 6 .0 0
2 8 1 .6 0
6 5
6 2
6 2
5 8
3 2
2 9
6 3
6 0
5 A o ffic e
3 3
3 0
6 6
6 3
6 1
2 5 1 .6 0
h o t e l a m 5 e9 n i t i e s
1 6
2 1
2 1
1 3
0 .0 0
3 4
2 8 8. 0 0
2 7 6 .6 0
6 4
r e f u g e /m e c h
3 5
h o te l a m e n itie s
1 7 2 .0 0
0 4
6 1
6 0
3 6
/
2 8 1 .6 0
6 6
6 5
s k y lo b b y
h o te l a m e n itie s
h o te l a m e n itie s
4 7
2 2
1 7
0 1
2 5 1 .6 0
6 0
5 9
0 6
2 3
2 2
1 9
2 5 .0 0
3 7
0 9
0 7
1 7 2 .0 0
2 4
1 8
0 5
/
2 5
2 6
2 5
0 4
0 1
3 5 0 0
2 7
2 3
2 1
0 3
1 4 3 0 0
4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
2 8
2 4
2 2
0 8
2 9 1 3 0 .0 0
2 5
2 3
1 0
re fu g e /m e c h
ELEVATOR SYSTEM DIAGRAM
2 4
4 6 .0 0
3 0
e l e v a t o r s y s t e m d i a g r a 2m 6 IV - lo t 0 3
2 5
8 8 .0 0
3 1
2 7
2 6
2 0
6 1
1 1
3 2
2 8
1 3 0 .0 0
3 8
1 7
3 3
h o te l a m e n itie s h o te l a m e n itie s
s e r v ic e d a p a r tm e n t 6 2
3 9
1 3
0 5
3 4
2 0 5 .6 0
6 3
4 0
1 5
0 8
3 7
3 5
2 9
2 7
0 4
4 2 0 0
3 0
4 1
2 1 2 .8 0
1 0
3 8
4 8
s e r v ic e d a p a r tm e n t
1 7
1 2
3 6
3 1
2 8
2 7
1 7 2 .0 0
4 9
/
c a fe / re s ta u ra n t p a r k in g
6 4
2 1 2 .8 0
5 0
/
ro o f g a rd e n
c o m m e r c ia l / r e ta ils
2 8 8. 0 0
6 4
5 1
4 3
6 2
1 4
4 0
5 2
/
re fu g e /m e c h o ffic e p o d iu m
h o te l a m e n itie s
s e r v ic e d a p a r tm e n t
4 4
2 0 5 .6 0
3 9
5 3
4 5
1 9
o
5 4
4 2
1 6
4 8
4 1
3 2
4 2 0 0
2 8 8 0 0 0
4 2 0 0
4 2 0 0 4 2 0 0
4 2 0 0
4 2 0 0
1 3 0 .0 0
4 9
5 5
2 8 1 .6 0
2 7 6 .6 0
6 5
5 6
4 6
8 8 .0 0
1 8
4 3
3 3
3 2
2 9
5 1
4 4
3 4
3 3
3 0
5 2
5 7
4 7
6 3
2 0
4 2
3 5
4 2 0 0 -1 4 .3 0
2 1
5 3
h o te l a m e n itie s
4 2 0 0
-1 0 .8 0
b 3
5 4
5 0
6 4
2 2
5 5
h o te l a m e n itie s
3 5
2 4
2 3
5 6
4 5
3 6
3 1
0 6
4 2 0 0
5 0 0 0
5 0 0 0 5 0 0 0 5 0 0 0
3 5 0 0 0
5 0 0 0 5 0 0 0 5 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 1 0 0 0 0 6 0 0 0 1 4 3 0 0
3 5 0 0
4 2 0 0
2 8 8 0 0 0
-6 .0 0
8 3 0 0
4 2 0 0
4 2 0 0 4 2 0 0
0 .0 0
b 2
5 7
4 6
3 7
3 4 0 1
b 1
s k y lo ft
4 7
3 8
1 7 2 .0 0
2 7 6 .6 0
6 5
s e r v ic e d a p a r tm e n t
3 9
5 0 0 0 5 0 0 0 5 0 0 0
2 5 0 0 0
4 2 0 0 4 2 0 0
4 2 0 0
4 2 0 0
3 5
g r o u n d le v e l m a in lo b b y
/
4 2 0 0
4 0
c o re
ELEVATOR SYSTEM DIAGRAM
IV - lo t 0 3
5 0 0 0
1 1 4 0 0 5 0 0 0
3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
1 8 0 6 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
g r o u n d le v e l
0 2
2 2
2 0 5 .6 0
4 1
3 6
0 2
3 6
0 5
2 4
4 8
4 2
0 3
0 7
4 2 0 0
e le v a to r s y s te m d ia g r a m I V - l o g t r o0 u3 n d l e v e l m a i n l o b b y
3 6 0 0
3 6 0 0 0
3 6 0 0
1 1 4 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0
3 5 0 0 0
5 0 0 0 5 0 0 0 5 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 4 2 0 0
3 6 0 0
3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 4 2 0 0 4 2 0 0
0 4
0 9
2 5
4 9
s k y lo ft
2 4 1 .6 0
8 3 0 0
1 1 4 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0
5 0 0 0
3 6 0 0 3 6 0 0 0
5 A o ffic e 2 8 8 0 0 0
12M
c o re
3 7
50TH FLOOR(212M)-TYPICAL APARTMENT 2 6
8 3 0 0
1 4 3 0 0
3 6
1 8 0 6 0 0
-1 4 .3 0
CORE LAYLOUTe l e v DIAGRAM a to r s y s te m d ia g r a m
CORE LAYLOUT DIAGRAM
5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0
3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0
s k y lo ft s e r v ic e d a p a r tm e n t h o te l a m e n itie s 5 A o ffic e
20TH FLOOR(66M)-TYPICAL OFFICE
2 1 2 .8 0
4 3
3 8
2 5 .0 0
1 2
lo b b y
b 3
4 2 0 0
-1 4 .3 0
0 5
1 4
2 7
6 0 0 0
-1 0 .8 0
b 3
3 5 0 0 0
5 0 0 0 5 0 0 0
s k y lo ft
3 5 0 0 0
s e r v ic e d a p a r tm e n t
h o te l a m e n itie s
3 6 0 0 3 6 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 5 0 0 0 5 0 0 0 5 0 0 0
2 5 0 0 0
1 0 0 0 0 6 0 0 0 1 4 3 0 0
8 3 0 0 3 5 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
-1 0 .8 0
5 1
2 0 5 .6 0
4 8
0 6
1 5
5 0 0 0
-6 .0 0
b 2
5 2
5 0
2 5
4 2 0 0
FACADE DIAGRAM
-6 .0 0
b 2
0 7
1 6
5 0 0 0 5 0 0 0
2 5 0 0 0
1 0 0 0 0 3 5 0 0
5 0 0 0
2 5 0 0 0
0 1
b 1
5 3
4 4
3 9
0 8
b a s e m e n t le v e ls
1 3 0 .0 0
5 4
6 6
2 6
5 8
s k y lo ft
6 6 2 4 1 .6 0
5 8
2 8 1 .6 0
2 5 1 .6 0
2 7
4 2 0 0
c o r e la y o u t d ia g r a m - lo t 0 3
b 1
0 9
1 7 2 .0 0
5 9
5 5
4 5
4 9
4 0
4 6 .0 0
1 7
2 8
0 .0 0
0 2
c o r e la y o u t d ia g r a m
1 0
1 8
2 9
2 1 2 .8 0
5 0
4 1
1 1
0
0 .0 0
4 2
1 0
5 6
4 6
4 2
1 2
1 9
3 0
5 1
4 3
2 6
3 1
2 4 1 .6 0
5 7
4 7
5 2
4 4
1 4
1 1
2 0
3 2 2 5 .0 0
5 3
4 5
c o re
1 5
1 3
0 3
0 1
1 6
1 3
p a r k in g
-1 4 .3 0
12M
1 7
2 1
3 3
5 4
1 8
2 3
3 4
b a s e m e n t le v e ls
5 5
4 6
8 8 .0 0
2 2
c o m m e r c ia l / r e ta ils
-1 0 .8 0
b 3
3 6
g r o u n d l e v e l m a i n l o b bI V y - l o t 0 3
FACADEAIN DIAGRAM EN RANCEI V
OBB
4 2 0 0
1 8 0 6 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
b 2
0
c o re
2 5
3 5
h ig h - s p e e d e x p r e s s FIRE/SVERICE fir e / s e r v ic e
4 6 .0 0
5 0 0 0
-6 .0 0
3 5 0 0
8 3 0 0
1 4 3 0 0
S
3 5 0 0
g r o u n d le v e l
1 1 4 0 0
1 1 4 0 0 5 0 0 0 5 0 0 0 5 0 0 0 3 6 0 0 3 6 0 0
5 0 0 0 5 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 0
3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
1 8 0 6 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
IN G
1 0 0 0 0
-1 4 .3 0
b 1
2 0
1 9
2 9
3 6
ER
6 0 0 0 1 4 3 0 0
4 2 0 0 4 2 0 0
g r o u n d le v e l m a in lo b b y GROUND FLOOR-ENTRANCE
2 1
2 0 5 .6 0
b a 4s4 e m e n t le v e ls
3 0
1 7 2 .0 0
5 6
4 7
3 1
3 7
5 0 0 0
6 0 0 0 -1 0 .8 0
b 3
3 6 0 0
1 1 4 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0
3 5 0 0 0
5 0 0 0 5 0 0 0 5 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
1 8 0 6 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
5 0 0 0
2 5 0 0 0
1 0 0 0 0
0 .0 0
2 2
3 2
3 8
0 2
2 5 .0 0
2 3
OFFICE HIGHT ZONE OFFICE MIDDLE ZONE OFFICE HIGHT ZONE ZONE OFFICE MIDDLE ZONE OFFICE LOW o ffic e h ig h z o n e f f i c e m i d d l e z o n SKYLOBBY e 中 EXPRESS oHOTEL OFFICE LOW ZONE o ffic e lo w z o n e o ffic e h ig h z o n e HIGHT-SPEED e x p r e s s h o t eEXPRESS l s k y lo b b y f f i c e m i d d l e z o n SKYLOBBY e 中 EXPRESS oHOTEL h ig h - s p e e d e x p r e s s o ffic e lo w z o n e FIRE/SVERICE fir e / s e r v ic e HIGHT-SPEED e x p r e s s h o t eEXPRESS l s k y lo b b y
0 3
0 7
2 4
2 1 2 .8 0
4 9
2 4
4 6 .0 0
0 8
2 5
3 3
3 9
0 4
0 9
5 1
3 4
0 6
1 1
2 6
2 8
0 7
1 2
5 2
g r o u n d le v e l m a in lo b b y
4 1
0 8
0 5
2 7
FACADE DIAGRAM
1 3
2 5 .0 0
8 3 0 0
1 4 3 0 0
b 2
3 5 0 0
-6 .0 0
N A R T IU M
1 3 0 .0 0
2 8
5 3
3 7
4 3
5 7
2 8
6 0
2 5 1 .6 0
5 9
/
中
/
s e r v ic e d a p a r tm e n t lo b b y
s k y lo ft 2 5 1 .6 0
中
中
s k y lo ft
2 8 8. 0 0
6 1
6 0
o b s e r v a tio n
s k y g a r d e n / o b s e r v a tio n s k y c lu b h o u s e
中
6 3
2 9
p ro g ra m p ro g ra m
o b s e r v a tio n d e c k / s k y g a r d e n s k y c lu b h o u s e
o b s e r v a tio n d e c k / s k y g a r d e n / s k y c lu b h o u s e 中
2 8 8. 0 0
1 3 0 .0 0
3 0
6 1
2 9
3 8
4 0
1 4
1 4
b a s e m e n t le v e ls
5 0 0 0
4 2 0 0 5 0 0 0 5 0 0 0 5 0 0 0
2 5 0 0 0
1 0 0 0 0
b 1
g r o u n d le v e l
4 6
8 8 .0 0
1 5
O PE
3 1
3 0
4 0
CORE LAYLOUT DIAGRAM4 2
6 0 0 0
0 .0 0
c o r e la y o u t d ia g r a m IV - lo t 0 3
1 6
1 5
3 2
h o te l s k y lo b b y
4 4
0 9
0 4
0 1
-1 0 .8 0
-1 4 .3 0
1 7
1 6
3 3
4 3
2 0 5 .6 0
2 4 1 .6 0
5 8
le v e l 2 0
5 4
4 5
-6 .0 0
b 2 b 3
1 8
1 3
5 9
1 7 2 .0 0
3 4
4 6
4 8
2 5 1 .6 0
6 0
3 5
OFFICE HIGHT ZONE OFFICE MIDDLE ZONE OFFICE LOW ZONE o ffic e h ig h z o n e f f i c e m i d d l e z o n SKYLOBBY e 中 EXPRESS oHOTEL o ffic e lo w z o n e HIGHT-SPEED e x p r e s s h o t eEXPRESS l s k y lo b b y 2 1 2 . 8 0h i g h - s p e e d e x p r e s s FIRE/SVERICE fir e / s e r v ic e
4 9
6 1
3 6
5 5
4 8
5 8
c o re
6 5
中
6 2
5 9
6 2
3 7
2 4 1 .6 0
5 6
5 0
6 0
6 3
2 0 5 .6 0
3 8
5 9
fir e / s e r v ic e
4 5
1 9
SF
4 8
3 9
3 9
h o te l s k y lo b b y
2 2
1 0
0 5
0 2
b 1
2 6
1 7
4 6 .0 0
5 0
2 1 2 .8 0
4 9
4 0
4 7
5 1
5 0
c o re 6 4
4 1
2 5 1 .6 0
h i g h - s p e e d 5e 7 x p r e s s
4 7
0 .0 0
1 1
1 0
0 1
0 1
8 8 .0 0
1 8
5 2
1 3 0 .0 0
1 2
0 6
0 3
0 3
2 0
2 1
2 0
5 3
2 1
2 2
0 2
2 5 .0 0
0 4
2 5 .0 0
0 4
1 9
4 2 0 0 4 2 0 0
0 5
c o re
O P E N A R T IU M
5 1
4 3
4 1
0 6
IN G
5 2
2 8 1 .6 0
2 7 6 .6 0
6 4
re fu g e /m e c h
3 1
6 6
s k y g a rd e n / SKY GARDEN
s k y g a r d e SKY n / CLUB / 中 s o k y b c l s u b eHOUSE h r o v u s a e t i o 中n SKY GARDEN s k y lo ft s g R r k a E m y c l u b HOUSE h SKY o u LOFT SKYLC ps Okr O oCLUB s s e er v i c e d APARTMENT a 中 p a rtm e n t SERVICED y A g D a r d T e R n A / N o b S s F e r E v R a t Ii o N n G 中 / lo b b y / LOBBY y s c k l u yb h l o o u f s t e 中 SKYss kk LOFT re fu g e /m e c h / REFUGE y lo ft a p a o r f fti cm e e n t s e r s v i ce e rd v a p i c a r e t m d e APARTMENT n t OFFICE SERVICED o b s e r v a tio n d e c k p o d i u m ROOF r o o f g a GRADEN rd e n PODIUM lo b b y / lo b b y / h o t eAMENITIES l a m e n itie s HOTEL LOBBY re fu g e /m e c h / b s e r v a t i o n d e c k COMMERICAL / s kc o y m m g e a r c r i a d l / e r e n t a i l s / s k y c lu b h o u s o ffic e c h c a f e / r e s t a u /r a n t O P r E e N f u A R g T e I U / Mm eCAFE/RESTAURANT REFUGE / p o d iu m r o o f g a r d e n in g s k hy o t o ec l fl a uf m i cb e n e i h t i e o s u s PARKING e p a r k中 o b s e r v a tio n d e c k / s k y g a r d OFFICE c o m m e r c ia l / r e ta ils / s k y c lu b h o u s e 中 rd e n c a f p e / o r e d s t i a u u r m a ROOF n t r o o f / g a GRADEN PODIUM p a r k in g h o t e AMENITIES l a m e n itie s HOTEL c o m m e r c ia l / r e ta ils / OFFIC COMMERICAL s k y lo ft c a fe / re s ta u ra n t / OFFIC CAFE/RESTAURANT s OFFIC PARKING C O p R aE r k i n g L O A D T R A N S F E s R k I Ny Gl o f t EXPR HIGH FIRE/
2 8 8. 0 0
s k y c lu b h o u s e
中
3 2
6 3
6 2
6 1
2 7 6 .6 0
6 5
5 3
4 2
2 4 1 .6 0
5 4
0 7
ER
5 4
4 5
z o n e s e r v ic e d a p a r tm e n t
4 6 .0 0
0 9
0 5
2 7 6 .6 0
6 2
2 8 1 .6 0
6 6
5 5
4 4
6 0
5 5
0 8
2 7
N A R T IU M
4 2 0 0
OFFICE HIGHT ZONE OFFICE MIDDLE ZONE OFFICE LOW ZONE o ffic e h ig h z o n e f f i c e m i d d l e z o n SKYLOBBY e 中 EXPRESS oHOTEL o ffic e lo w z o n e HIGHT-SPEED e x p r e s s h o t eEXPRESS l s k y lo b b y h ig h - s p e e d e x p r e s s FIRE/SVERICE fir e / s e r v ic e
0 3
0 6
c o re
C O R E L O A D T R A N S F E R IN G
2 3
O PE
2 3
0 4
0 7
1 1
1 0
2 8 1 .6 0
6 3
2 4 1 .6 0
5 6
4 6
h o t e l s k y l o b 5 b8 y
5 6
2 8
SF
C O R E L O AD T R AN
4 2 0 0
/
5 0 0 0
4 2 0 0
0 8
c o re
1 2
2 9
g r o u n d le v e l C O R E L O DA T R AN
1 3 0 .0 0
2 4
re fu g e /m e c h
4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0
0 5
c o re
1 3
2 4
4 6 .0 0
0 9
/
1 4
2 5
2 5
0 7
O P E N A R T IU M
1 7 2 .0 0
2 6
0 6 1 0
re fu g e /m e c h
1 5
3 0
4 2 0 0
4 2 0 0
1 1
0 8
c o re
1 6
0 2
3 3
4 2 0 0
4 2 0 0
c o re
1 2
1 7
3 1
4 2 0 0
4 2 0 0
4 2 0 0
0 9
1 3
8 8 .0 0
1 8
3 3
4 2 0 0
4 2 0 0 4 2 0 0
4 2 0 0
1 0
1 4
2 1
3 4
4 2 0 0
1 1
1 5
O P E N A R T IU M
lo w
2 8 0 .0 0
4 7
h i g h z o h n o e t e s l e s r v k i c y e l d o ba p b a y r t m e n t
5 7
4 2 0 0
4 2 0 0
1 2 4 2 0 0
4 2 0 0 4 2 0 0
/
4 2 0 0
1 6
re fu g e /m e c h
fir e / s e r v ic e
2 2
3 5
4 2 0 0
4 2 0 0
4 2 0 0
1 3
1 7
c o re
4 2 0 0
4 2 0 0
1 4
C O R E L O A D T R A N S F E R IN G
c o re
c o re
FACADE DIAGRAM
b a s e m e n t le v e ls
4 2 0 0 4 2 0 0 4 2 0 0
1 5 4 2 0 0
4 2 0 0
le v e l 2 0
8 8 .0 0
4 2 0 0
2 0
1 8
h ig h - s p e e d e x p r e s s
2 6
2 0
6 6
6 5
6 4
2 5 1 .6 0
5 7
2 7 6 .6 0
6 1
s k y lo ft 5 8
2 3
1 7 2 .0 0
2 8 1 .6 0
6 3
2 5 1 .6 0
5 9
2 4
IN G
6 6
6 2
C O R E L O a A p D a T r Rt m A N e S n F t E R I N G
2 5
ER
fir e / s e r v ic e
6 4
h o te l s k y lo b b y
2 7
3 2
4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
1 6
1 9
c o re 2 0 5 .6 0
3 8
1 7
2 1
4 8
2 7
1 8
2 2
4 9
2 8
8 8 .0 0
1 9
2 3
/
1 3 0 .0 0
2 8
3 6
2 1 2 .8 0
2 9
2 0
2 4
5 0
3 0
4 2 0 0
O P E N A R T IU M
re fu g e /m e c h
2 9
3 7
5 1
3 1
2 1
2 5
5 2
4 2 0 0
4 2 0 0
1 8 0 6 0 0
4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
2 6
c o re
3 0
3 9
3 2
2 2
c o re
lo w z o n e s e r v ic e d
3 2
2 0 5 .6 0
4 8
h ig h - s p e e d e x p r e s s
6 5
6 0
h ig h z o n e s e r v ic e d a p a r tm e n t
3 3
4 9
5 8
2 8 0 .0 0
s k y lo ft
3 5
2 1 2 .8 0
5 0
3 8
3 4
2 3
2 7
3 6
5 1
4 1
5 3
3 5
2 4
2 8
le v e l 2 0
5 4
OFFICE HIGHT ZONE OFFICE MIDDLE ZONE OFFICE LOW ZONE o ffic e h ig h z o n e f f i c e m i d d l e z o n SKYLOBBY e 中 EXPRESS oHOTEL o ffic e lo w z o n e HIGHT-SPEED e x p r e s s h o t eEXPRESS l s k y lo b b y h ig h - s p e e d e x p r e s s FIRE/SVERICE fir e / s e r v ic e
2 6
2 9
3 7
5 2
6 2
lo w z o n e s e r v ic e d a p a r tm e n t
3 3
6 4
6 3
h ig h z o n e s e r v ic e d a p a r tm e n t
6 1
3 6
4 2 0 0
1 3 0 .0 0
1 7 2 .0 0
3 8
IN G
s k y c lu b h o u s e
v e l 4 0
h o te l s k y lo b b y
1 9
SF
3 7
2 5
c o re
ER
5 3
4 0
5 5
3 9
4 2 0 0
c o re
FIRE/SVERICE
3 9
4 2
C O R E L O AD T R AN
4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0
2 8 8 0 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
h o te l s k y lo b b y
4 2 0 0
/
5 4
4 3
c o re
5 6
4 0
4 2 0 0
4 2 0 0 4 2 0 0 2 8 8 0 0 0
4 2 0 0
C O R E L O A D T R A N S F E R IN G
4 2 0 0 4 2 0 0 4 2 0 0
3 0
1 8 0 6 0 0
1 3 0 .0 0
2 7
re fu g e /m e c h
2 4 1 .6 0
5 7
4 2
/
2 8
3 1
c o re
4 3
re fu g e /m e c h
2 9
3 2
/
4 1
4 4
4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
3 0
3 3
re fu g e /m e c h
6 5
5 9
6 3
1 .6 0
2 7 6 .6 0
6 5
2 8 8. 0 0
6 4
s k y lo ft
C O R E L O A D T R A N S F E R IN G
4 2
4 5
c o re
2 5 1 .6 0
4 1
3 1
3 4
c o re
4 4
3 2
3 5
2 0 5 .6 0
4 3
3 1
4 5
3 3
le v e l 4 0
le v e l 4 0
4 6
3 4
1 7 2 .0 0
4 4
5 5
4 6
4 7
3 7
3 7
c o re
3 6 0 0
3 6 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0 4 2 0 0
3 8
3 6
c o re
1 7 2 .0 0
3 5
4 2 0 0
4 0
le v e l 2 0
h o te l s k y lo b b y
3 9
C O R E L O A D T R A N S F E R IN G
c o re
4 1
c o re
h i g h /- s p e e d e x p r e s s
3 6
3 8
c o re
h o te l s k y lo b b y
4 2 0 0
c o re
/
3 9
c o re
re fu g e /m e c h
4 2 0 0
re fu g e /m e c h
4 2
c o re
5 8
lo w z o n e s e r v ic e d a p a r tm e n t
fir e / s e r v ic e
4 0
4 3
le v e l 4 0
s k y lo ft h ig h z o n e s e r v ic e d a p a r tm e n t
4 1
c o re
2 1 2 .8 0
4 9 4 8
2 8 1 .6 0
2 7 6 .6 0
6 1
6 2
5 1
4 5
5 6
4 7
5 9
4 2 0 0
4 2 0 0 4 2 0 0 4 2 0 0
4 4
c o re
2 0 5 .6 0
4 2 0 0
c o re
2 0 5 .6 0
5 2
3 4
4 2 0 0
4 8
4 5
c o re
4 8
4 2
2 1 2 .8 0
4 9
5 3
5 0
6 6
6 0
8 3 0 0
5 0
SF
6 2
6 0
4 3
5 1
6 5
2 7 6 .6 0
6 3
4 9
4 4
5 2
2 8 1 .6 0
6 1
4 2 0 0
3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0 3 6 0 0
5 3
6 6
6 4
2 1 2 .8 0
4 5
5 4
4 7
c o re
5 0
4 6 5 5
4 6
c o re
5 1
4 7
5 6
4 2 0 0
le v e l 5 0
5 2
4 2 0 0
3 6 0 0 3 6 0 0
c o re 3 6 0 0 0
c o re
le v e l 5 0
5 7
5 3
4 2 0 0
3 6 0 0
c o re
3 6 0 0
c o re
2 4 1 .6 0
3 6 0 0
5 0 0 0 3 6 0 0
5 8
3 6 0 0
C O R E L O A D T R A N S F E R IN G
5 9
5 4
3 6 0 0
3 6 0 0 5 0 0 0
2 5 1 .6 0
5 0 0 0
6 0
5 5
3 6 0 0
3 6 0 0 0 3 6 0 0
5 0 0 0
3 5 0 0 0
c o re
6 1
5 6
5 4
4 0
2 8 0 .0 0
3 6 0 0
5 0 0 0
c o re
6 2
3 6 0 0
6 3
5 7
2 4 1 .6 0
3 6 0 0
3 6 0 0
5 0 0 0
3 6 0 0
3 6 0 0
5 0 0 0
c o re
SKYLOFT HIGHT ZONE SERVICED APARTMENT LOW ZONEE SERVICED APARTMENT HOTEL SKY LOBBY HIGHT-SPEED EXPRESS FIRE/SVERICE
2 4 1 .6 0
5 7
4 2 0 0
5 0 0 0
5 8
c o re
c o re
C O R E L c o O r e AD T c o R r e AN
3 6 0 0 0
2 7 6 .6 0
6 4
c o re
fir e / s e r v ic e
5 0 0 0
6 5
3 6 0 0
1 1 4 0 0
6 6
5 5
4 6
4 2 0 0
5 0 0 0
6 0
h ig h - s p e e d e x p r e s s
3 6 0 0
h o te l s k y lo b b y 2 5 1 .6 0
5 6
4 7
5 8
z o n e s e r v ic e d a p a r tm e n t
3 6 0 0
5 0 0 0 5 0 0 0
3 5 0 0 0
lo w
5 9
5 9
h ig h z o n e s e r v ic e d a p a r tm e n t
6 1
2 8 1 .6 0
2 5 1 .6 0
5 0 0 0
5 0 0 0 5 0 0 0
le v e l 5 0
s k y lo ft
6 2
2 8 0 .0 0
5 0 0 0 5 0 0 0 3 6 0 0 3 6 0 0 3 6 0 0
3 6 0 0
6 2
5 7
3 25 8
6 6
3 4
SKYLOFT HIGHT ZONE SERVICED APARTMENT SKYLOFT LOW ZONEE SERVICED APARTMENT HIGHT ZONE SERVICED APARTMENT HOTEL SKY LOBBY c o re LOW ZONEE SERVICED APARTMENT HIGHT-SPEED EXPRESS HOTEL SKY LOBBY HIGHT-SPEED EXPRESS FIRE/SVERICE c o re
2 4 1 .6 0
o b s e r v a tio n d e c k / s k y g a r d e n
o b s e r v a tio n d e c k / s k y g a r d e n
2 8 0 .0 0
6 4
C O R E L O A D T R A N S F E R IN G
5 0 0 0 3 6 0 0
5 0 0 0
5 8
6 3
6 0
6 3
2 5 1 .6 0
5 0 0 0
5 0 0 0
6 0
2 7 6 .6 0
6 4
6 5
6 1
5 9
6 1 6 5
6 6
6 2 3 5 0 0 0
1 1 4 0 0
2 7 6 .6 0
6 4
3 6 0 0 0
c o re
2 8 1 .6 0
6 5
3 6 0 0
c o re
c o re
6 6
5 0 0 0
c o re
2 7 6 .6 0
6 3
5 0 0 0
6 6
2 8 1 .6 0
6 5
6 4
3 5 0 0 0
1 1 4 0 0
2 8 0 .0 0
2 8 0 .0 0
6 6
SKYLOFT 2 8 1 .6 0 HIGHT ZONE SERVICED APARTMENT LOW ZONEE SERVICED APARTMENT 6 .6 0 HOTEL2 7 SKY LOBBY le HIGHT-SPEED EXPRESS FIRE/SVERICE
5 A o ffic e
4 2 0 0
3 7
3 6
SKYLOFT HIGHT ZONE SERVICED APARTMENT LOW ZONEE SERVICED APARTMENT HOTEL SKY LOBBY HIGHT-SPEED EXPRESS FIRE/SVERICE
2 8 1 .6 0
c o m m e r c ia l / r e ta ils
c o re
2 8 8. 0 0
2 8 0 .0 0
IV - lo t 0 3
b 2
-1 0 .8 0
b 3
-1 4 .3 0
IV - lo t 0 3
1st Pri e in Competition 2012 Spring i ed use
CATENARY Pri e in C T O W E1st R
Beijing Capital International Airport
Wangjing Science and Technology Park
Zhongguancun Haidian Science Park
m 0 0 1 > g ni dli m 0 3 > g ni dli m ui d
Forbidden City
2nd Ring
3rd Ring
Central Business District
Forbidden City
CCTV
Finalist of international competition 2014 Of ce to er Concept design DAO R E Z - I L
DAO R
RE V I R
S UTO L
4th Ring
t
IZE SOHO BEI ING, RC GFA 0,000s m
n oit c e S DAO R N O I TAT S T S E W
SOHO Li-Ze SOHO
3 6 0 0 m6 3 m
20m0 m 0 2 0
20 0 0 m2 m 0
20 0 0 m m 0 2
1 m50 5 0m 1 1m 0 0 m 0 0 1
2
To Future Daxing Airport
3 与
5k m
5kNm
N
Interface with Financial Financi al District
CON E
F OOR
e site is located at i Ze, Bei ing s ne Financial District, and sit ated at a strategic infrastr ct ral nction ad acent to a s b a interc ange station and ele ated e press a connecting t e 2nd and rd ringroad A par li e setting s rro nds t e site it a bo le ard to t e nort and a par it t e f t re ndergro nd mall to t e est e re ested de elopment indicates a precise program t at lls o t t e site it a 200m tall to er and a 0m tall podi m e rec perate t e slab t polog , rat er t an t e t pical isolated s scraper, in an e plicit s aped con g ration in order to establis a d namic engagement it t e district and optimi e t e or space
A E EFFICIENC
ie
Open View to Cultural Institues
nit si e from 100 2000m2
Blocked Blocke d
Blocked
Interface Interf ace with Financial District
gla ed lengt
1
Frantic Highway Highway
4 more corner
CORE EFFICIENC Open View to Lotus River & Lotus Park
17 17
6
131125 Final Final A3 A3 Book_rev15.indd Book_rev15.indd 17 17 131125
11/23/2013 3:12:43 3:12:43 PM PM 11/23/2013
CONCE o e ploit t e f ll potential of t e site, t o intersected slabs are oriented it ide faces to capt re t e open ie s to ards t e ot s Ri er and financial district in t e East and est ereas t e faces are minimi ed in t e largel bloc ed main rban a is to ards t e e press a and ad acent to ers in t e Nort and So t
Interface
Open
Open
ie
ie
it Financial District
to C lt ral Instit es
to ot s Ri er
ar
Interface
e corner cores merge it t e o ter str ct re and elp resist lateral loads ile opening p t e perimeter and center for lig t and ie enabling efficient and omogeno s or places e corner cores are also co pled as a str ct ral nit ic allo s for t inner core alls and optimi ed efficienc on t e floorplate e t in slab ac ie es lateral stabilit b t e densit of t e 4 m col mn grid and t e core alls in t is slab do not re ire lateral str ct ral performance
of ce space
it Financial District
GROUD 0
225m m
ere are r mainmain oneszones of There arefo four of access from tthe e par e west, est, access: park on on tthe t e proposed commercial commercial strip strip and the and s b exit a on e itthe on north, t e nort , the subway from from t e passenger and passenger drop-offdrop andoffsubway s xb an ethiteon t ste, east, e it o ea and and fromfrom the t e passenger drop off area passenger drop-off area ononthe t e so t south. 1 2 3 4 5 6 7 8 9 10 10 11 11
s
lobb
Passenger Drop-off assenger Drop off Office Lifts Office ifts Tower o erLobby obb Express E pressLifts iftstotoSky S Lobby obb Mid idZone ZoneLifts ifts Lower Lifts o erZone Zone ifts Escalators To B1 Retail Escalators o B1 Retail Subway S b a Public blicPark ar Commercial Strip Commercial Strip Retail Retail
lobb Finalist of international competition 2014 Of ce to er Concept design
IZE SOHO
ODIU
FACADE ED f rt er en ances isibilit , and pro ides a d namic ad ertising message board to ards t e ig a
Not onl t e o erall concept for t e oorplan and core a e to stand o t it in t e ast offer of to ers in t e cit , also t e fa ade design and o erall isibilit of t e to er are important O A as done se eral tests t at s o t at it in t e nfort natel dif c lt air sit ation in Bei ing a dar er color and clearl de ned and readable fa ade stand o t best nder all circ mstances
e plint fa ade e podi m can be read as separate masses positioned all aro nd t e to er As a contrast to t e dar erected to er t ese masses on t e base are designed as ge transl cent ice bloc s Und lating transl cent glass faces t e rban street le el ile t e inner c r ed facades, facing t e to er, are made of transparent oat glass o ac ie e t e nd lating transl cenc t e street facade is split p in a do ble s in fa ade a transparent screen it a transl cent at facade be ind
o er Facade Alt o g t e to er can be read as an intersection of t o ol mes, t e fa ade en elope as a niform appearance all aro nd is ma es t e inside and o tside corner con g ration more interesting and ma ing a to r aro nd, t e to er ill bit b bit re eal its con g ration e to er is cladded it a niti ed element to en ance a modest serenit e detailing and meas res of t is element are ig l re ned ertical n stiffeners contrib te to t e ind load resistance in t at a it ma es it possible to introd ce a s btle detailing and legibilit of t e indo and spandrel frames e niform dar color of t e fa ade is c osen to balance t e re nement of t e cladding and t e strengt of t e con g ration e en f rt er it a reference to t e Seagram B ilding of ies an der Ro e t e b ilding ill e press a timeless f nctionalit
to er facade
Cr cial is t e e pression of t e slabs it t e podi m, not as e tro erted ob ects, b t as an rban entit t at engages it t e p blic s rro nding e ma e t e site permeable b detac ing t e podi m to form an enclosed p blic space aro nd t e slabs a ne rban center Accessible from all corners of t e site, circ lation loops facilitate a smoot p blic flo in t e b ilding comple offering informal enco nters bet een office, retail and recreational acti ities it direct connection to t e s b a station and ndergro nd mall, t e o tdoor s n en pla a, s rro nding t e t in slab, in ites bot p blic and pri ate se at t e eart of t e site
plint facade
CORRU GATED -2
Ex t e r i o r v i e w
Finalist of international competition 2014 Of ce to er Concept design
IZE SOHO
Urban Concept Design 2010-2012 In progress
EASTERN NEW TOWN
CHENGDU,SICHUAN PROVINCE,PRC CHENGDU EASTERN NEW TOWN URBAN DESIGN PLANING AREA _41skm IN COLLABORATION WITH SUTHERLAND HUSSEY ARCHITECTS Y DESIGN OFFICE TAO ARCHITECTS DUOXIANG DESIGN OFFICE
GARDEN CITIES
ir bene er oward is known for his publication GARDEN CITIES OF TO-MORROW , the description of a utopian city in which people live harmoniously together with nature. The publication resulted in the founding of the garden city movement, that realised several Garden Cities in Great ritain at the beginning of the twentieth century
11 11 11
1
2 2 41KM 41KM 2 2 41KM 41KM 2 2 41KM 2 41KM
41KM
CHENDU CITY
MODERN GARDEN CITIES is the proposal by hengdu goverment which reference in arden ities theory, in order to protect and respect on the basis of an ecological background in the city, to divide the city into four parts The four general parts, creating sustainable development pattern of overall function 1.TWO ECOLOGICAL AND TOURISM DEVELOPMENT AREA 2.OPTIMIZED DEVELOPMENT AREA 3.PROMOTION DEVELOPMENT AREA 4.EXTENDED DEVELOPMENT AREA OVERLAY CHENGDU
To create a town for for , , people, oneone of of To create a town people, new e one panding Totowns create a surrounding town , rapidly people, new towns rapidly e one panding To create a surrounding town for for the , the people, of of Chengdu which is dedicated the devolopment new towns rapidly e one panding Chengdu which is dedicated to the Totowns create a surrounding town for the ,to people, To create a surrounding town for , the people, one of of new rapidly edevolopment panding Totowns create town for ,the people, one of of creative an cultural industry The design area Chengdu which is dedicated to the of creative an cultural industry The design area new surrounding the rapidly e panding new towns surrounding the rapidly edevolopment panding Chengdu which isadedicated to devolopment new towns surrounding rapidly e panding is square kilometres ofthe which square of creative an cultural industry The design area is about square kilometres ofthe which square Chengdu which is dedicated to devolopment Chengdu which is dedicated to the devolopment ofabout creative an cultural industry The design area Chengdu which is dedicated the devolopment kilometres of land for construction purposes is kilometres oftoThe which square kilometres of land for construction purposes ofabout creative an cultural industry design area of creative an square cultural industry design area is about square kilometres of The which square of creative an cultural industry The design area information hiling park which will besquare an an kilometres of land for construction purposes information hiling park will be is about kilometres of which which is about square kilometres of which square kilometres of square land for construction purposes is about square kilometres of which square ecological green is kilometers with information hiling park which will be an ecological space issquare square kilometers kilometres of space land construction purposes kilometres of green land for for construction purposes information park which will be anwith kilometres of hiling land for construction purposes in this. ecological green space is square kilometers with in this. information hiling park which will be information hiling park which will be an ecological green space is square kilometers with information hiling park which will bean an in this. ecological green space kilometers ecological green space is issquare kilometers withwith in this. ecological green space issquare square kilometers with in this. in this. in this.
1 1 1
1 1 11
INDUSTRY FOUNCTION AREA DISTINCT HEIGHTLANDS DISTINCT HEIGHTLANDS ANDAND LOWLANDS LOWLANDS DISTINCT HEIGHTLANDS DISTINCT HEIGHTLANDS AND LOWLANDS AND LOWLANDS DISTINCT HEIGHTLANDS DISTINCT HEIGHTLANDS DISTINCT HEIGHTLANDS
OBVIOUS OBVIOUS BOUNDARY BOUNDARY OBVIOUS OBVIOUS BOUNDARY BOUNDARY OBVIOUS OBVIOUS OBVIOUS BOUNDARY BOUNDARY BOUNDARY
AND LOWLANDS LOWLANDS ANDAND LOWLANDS
Northwest North China
SITE INFORMATION SITE INFORMATION 1. GIS ANALYSIS 1. GIS ANALYSIS SITE INFORMATION SITE INFORMATION SITE INFORMATION Project site located in the Chengdu lower plain, 1. GIS ANALYSIS Project site located in the Chengdu lower plain, 1. GIS ANALYSIS SITE INFORMATION SITE INFORMATION 1. GIS ANALYSIS
2 2 2
2 22 2
22 22 222
MAIN URBAN ROAD MAIN URBAN ROAD MAIN URBAN ROAD MAIN URBAN ROAD MAIN URBAN ROAD
MAIN URBAN ROAD MAIN URBAN ROAD
嘉
Northwest North China
Chengdu
长
SAME SCALE COMPARISON OF THE CENTRE BUSINESS DISTRICT
嘉 Chengdu
陵 the Changjiang River 江
长
East China
岷
江
South China
江 江 江
长
SICHUAN
Southeast Asia
BEIJING
SPREAD EXPANSION VOLUME DEVELOPMENT
21TH CENTURY DEVELOPMEN TMODEL
FLOW WHOLE SUSTAINABLE DEVELOPMENT
the Changjiang River
岷 East China this ranges up to meters height difference, Project site located in the Chengdu lower plain, this in ranges up to the meters height difference, 1.inGIS ANALYSIS 1. GIS ANALYSIS Project site located in Chengdu lower plain, Project site located in the Chengdu lower plain, using planning geographic information system this in ranges up to meters height difference, the planning geographic information system Project site located in the Chengdu lower plain, Project site located in the Chengdu lower plain, thisusing inthe ranges up to meters height difference, this in ranges up to meters height difference, 江 South China analysis of the land prior tometers the start, understand using the information system analysis ofplanning the land prior to information the start, understand this in ranges up togeographic height difference, this inthe ranges up to meters height difference, using the planning geographic information system using planning geographic system the comprehensive land information, discover thethe analysis of the land prior to the start, understand analysis ofplanning the land prior to information the start, understand the comprehensive land information, discover using the geographic information system using the planning geographic system analysis of the land prior to the start, understand the comprehensive land discover the useful design the comprehensive land information, discover conditions analysis ofconditions the land prior toinformation, the start, understand analysis ofdesign the land prior to the start, understand theuseful comprehensive land information, discover thethe 江 useful conditions t useful is bedesign see from the analysis, thethe site design conditions tcan is can be see from the analysis, the comprehensive land information, discover the the comprehensive land information, discover thesite useful design conditions tdistinct is distinct can be see from analysis, the site itself topographical feature of high tcan is has can be see from thetheanalysis, analysis, the site topographical feature of high useful design conditions useful design conditions t itself is has be see from the the site has distinct topographical feature of high 长 itself land and low lands. itself has distinct topographical feature of high land and low lands. tcan is can from analysis, the t is has be be seesee from thethe analysis, the sitesite itself distinct topographical feature of high land and low lands. 3. EXISTING BUILDING INFORMATION land and low lands. 3. EXISTING BUILDING INFORMATION itself has distinct topographical feature of high itself has distinct topographical feature of high land and low lands. Southeast Asia 3.of EXISTING BUILDING the region isINFORMATION consecutive complete 3. EXISTING BUILDING astern oflow the region isINFORMATION consecutive complete land and lands. land and low lands. 3.astern EXISTING BUILDING INFORMATION astern of the region is consecutive complete ecological area, and better built environment of BUILDING the region isbetter consecutive complete ecological area, and built environment 3.astern EXISTING 3.astern EXISTING INFORMATION of BUILDING the region isINFORMATION consecutive complete ecological area, and better built environment te ture isof inisthe west There is consecutive aisclear distinct edge ecological area, and built environment te ture in the west There a clear distinct edge astern of region isbetter complete astern region isbetter consecutive complete ecological area, and built te ture is in the west There is a environment clear distinct edge where the e isting built urban form meets this te ture is in the west There is a clear distinct edge where the e isting built urban form meets this ecological area, and better built environment ecological area, and better built environment te ture is in the west There is a clear distinct edge where the e isting built urban form meets this ecological where ewest isting built urban form meets this ecological areas. te ture isareas. the west There isclear aform clear distinct edge te ture is inthe the There is a distinct edge where the ein isting built urban meets this ecological areas. 4. EXISITING WATER SYSTERM ecological areas. 4. EXISITING WATER SYSTERM where the e isting built urban form meets where the e isting built urban form meets thisthis ecological areas. 4. EXISITING WATER SYSTERM There isThere abundant water resources, reflects thethe 4. EXISITING WATER SYSTERM There is areas. abundant water resources, reflects ecological ecological 4. EXISITING WATER SYSTERM isareas. abundant water resources, reflects the characteristics ofSYSTERM the landscape There is WATER abundant water resources, reflects characteristics ofSYSTERM the agricultural landscape 4. EXISITING WATER 4. EXISITING There ischaracteristics abundant water resources, reflects thethe ofagricultural the agricultural landscape Taking advantage ofagricultural landscape resources isthe characteristics of the agricultural landscape Taking advantage of landscape resources isis There isfull abundant water resources, reflects There isfull abundant water resources, reflects the characteristics the landscape Taking fullof advantage of landscape resources an effective method Taking advantage of landscape resources an full effective an effective method characteristics of the agricultural landscape characteristics of method the agricultural landscape Taking full advantage of landscape resources is is 5. NATURAL & CULTURE 5. &method CULTURE RESOURCES an effective 5. NATURAL &method CULTURE Taking full advantage of RESOURCES landscape resources Taking full advantage of RESOURCES landscape resources is is anNATURAL effective There are two city greenlands the north and There are two greenlands in the north andand 5. NATURAL &city CULTURE RESOURCES There are two city greenlands in in the north an effective method an effective 5. NATURAL &method CULTURE RESOURCES south coner ofgreenlands the region, which are the valuable south coner the region, which are the valuable There are two city greenlands in the north and south coner ofCULTURE the region, which are the valuable 5. NATURAL & RESOURCES 5. NATURAL &of CULTURE RESOURCES There are two city in the north and natural resources in the chengdu with other natural resources in the chengdu with other si and south coner of the region, which are the valuable natural resources in the chengdu with other si si There are city greenlands in the north There are two city greenlands in the north and south coner oftwo the region, which are the valuable parts. parts. natural resources in the chengdu with other parts. south coner of the region, which are the valuable south coner of the region, which arewith the valuable natural resources in the chengdu other si si Two university(A.Chengdu university & B.Sichuang Two university(A.Chengdu university & B.Sichuang parts. Two university(A.Chengdu university &other B.Sichuang natural resources in the chengdu with other natural resources in the chengdu with si si parts. normal university) and a huge artist village(c. normal university) andand a university huge artist village(c. Two university(A.Chengdu & B.Sichuang university) a university huge artist village(c. parts. parts. Twonormal university(A.Chengdu & B.Sichuang hongding village consist a main cultural band hongding village consist a university main cultural band normal university) and aa university huge artist village(c. hongding village consist main cultural band Two university(A.Chengdu & B.Sichuang Two university(A.Chengdu & B.Sichuang normal university) and a huge artist village(c. hongding village consist main cultural band normal university) and aa huge artist village(c. normal university) and aa huge artist village(c. hongding village consist main cultural band hongding village consist a main cultural band hongding village consist a main cultural band
3 3 3
CHENGDU 20TH CENTURY DEVELOPMENT MODEL
陵
江
CHENGDU
EXISTING EXISTING BUILDINGS BUILDINGS EXISTING EXISTING EXISTING AREAAREA BUILDINGS BUILDINGS BUILDINGS EXISTING EXISTING AREA AREA AREA BUILDINGS BUILDINGS AREA AREA
EXISTING EXISTING BUILDINGS BUILDINGS EXISTING EXISTING EXISTING AREAAREA BUILDINGS BUILDINGS BUILDINGS EXISTING EXISTING AREA AREA AREA BUILDINGS BUILDINGS AREA AREA
EXISTING EXISTING NATURE NATURE EXISTING EXISTING EXISTING AREA AREA NATURE NATURE NATURE EXISTING EXISTING AREA AREA AREA NATURE NATURE AREA AREA
NATURE NATURE AREA AREA
333 33 33
3 33 3
4 44 44 44
EXISTING EXISTING
NATURE NATURE EXISTING EXISTING EXISTING AREAAREA NATURE NATURE NATURE EXISTING EXISTING AREA AREA AREA
A
A
TWO GREENLANDS TWO GREENLANDS A TWO GREENLANDS GREENLANDS A TWOTWO GREENLANDS
A
A
A
GREENLANDS TWOTWO GREENLANDS
EXISTING WATER EXISTING WATER EXISTING WATER RESOURCES RESOURCES RESOURCES EXISTING WATER EXISTING WATER RESOURCES RESOURCES EXISTING WATER EXISTING WATER RESOURCES RESOURCES
BB B B
555 55 55
C
EXISTING EXISTING B THREE THREE EXISTING CULTURE ZONE CULTURE ZONEZONE CULTURE B THREE THREE EXISTING EXISTING CULTURE ZONE CULTURE ZONE EXISTING B THREE THREE EXISTING
CULTURE ZONE CULTURE ZONE
C
C
C
C
C
C
GRREN AXIS LINK
GRREN AXISAXIS LINK LINK GRREN TWO GREENLANDS TWOTWO GREENLANDS GREENLANDS GRREN GRREN AXISAXIS LINKLINK TWO GREENLANDS TWO GREENLANDS GRREN AXISAXIS LINKLINK GRREN TWOTWO GREENLANDS GREENLANDS
EAS URBAN CONCEPT DESIGN URBAN CONCEPT DESIGN 2010-2012 URBAN CONCEPT DESIGN URBAN CONCEPT DESIGN 2010-2012 NEW IN 2010-2012 PROGRESS URBAN CONCEPT DESIGN URBAN CONCEPT DESIGN 2010-2012 IN PROGRESS 2010-2012 IN PROGRESS URBAN CONCEPT DESIGN
EA S TTSEET RR NN EA E NR TOWN E A S T E R E A S T E R NN NEW NEW EA S ETTOWN ER EA S TTOWN R NN
DESIGN S RA EG
URBAN S RUC URE One oop,
S RA EC 1 Intensif sparse and dense, compact la o ts
o Bands,
ree Islands QINGLONG LAKE PARK
MEDIA PARK CONTEMPORARY ART VALLEY
This proposal responds to the existing built area and nature,using this exsiting pattern to make tensive form and compact layout to fully ensure
URBAN COMMERCIAL SUB-CENTER
BRANCH PARK QINGLONGLAKE MUSEUM PARK
URBAN
NA URA
ISLEND
URBAN COMMERCIAL SUB-CENTER BRANCH PARK
NA URA
URBAN
SHILING ECOLOGICAL PARK
BRANCH PARK
LOW DENSITY SERVICE AREA GREEN BAND CITY
GREEN LOOP PARK
GREEN LOOP PARK
CREATIVE ENTERTAINMENT ISLAND
THE WISDOM ISLAND
ENDLESS TWINS TOWER
BRANCH PARK
BRANCH PARK
S RA EC 2 Hig densit on ig lands, lo
CITY
densit on lo lands
Taking full advantage of the topography resources in the region, strengthening areas highland to guide the new compact development model. By locating high density area on highlands, provides a good views and wind. Lowlands serve as the corridor, landscape valley, developing highquality public serve facilities and ecological landscape.
CREATIVE ENTERTAINMENT ISLAND
NEW YORK
THE WISDOM ISLAND
BRANCH PARK
NATURAL
ENDLESS TWINS TOWER
MEDIA PARK
GREEN BAND CITY
THE GATE PARK
BRANCH PARK
The overall planning strategy, conbined with the current situation, make a unique urban pattern, forms a unique and distinct structure.
MUSEUM ISLEND
SHILING ECOLOGICAL PARK
CONTEMPORARY ART VALLEY
0
EDINBURGH
EXISTING ROAD NETWORK
ROAD TRANSIT SYSTEM
500
1000
2000M
PUBLIC TRANSIT SYSTEM
STRENGTHEN
S RA EC
atri
FILL
atc Corridor
COMPARISON OF TWO MODELS OF HABITAT Grouping the industry funtions, forming high density patches(island) within the ecological area, thus improving function in the urban and ensuring preservation of the landscape. DESIGN STRATEGY Corridors link high density areas, layout services and leisure buildings such as matrix surround the islandsINTENSIFY in lowlands, these buildings also meet EXSITING DESIGN, COMPACT LAYOUTS characteristics of low density in low Thisdensity proposalarea. responds to the e isting built area and nature,
FAST METRO
using this e siting pattern to make tensive form and compact layout to fully ensure the qualities of garden city
LANDSCAPE LOOP
HIGH DENSITY IN HIGHLAND, LOW DENSITY IN LOWLAND Taking full advantage of the topography resources in the region, strengthening areas highland to guide the new compact development model. By developing using this to high density area in highlands, provides a good views and wind. Lowlands serve as the corridor, landscape valley, developing high quality public service facilities and ecological landscape MATRIX-PATCH-CORRIDOR rouping the industry functions, forming high density patches (island) with in the ecological area, thus improving function in the urban and ensuring preservation of the landscape. orridors link high density areas, layout services and leisure buildings such as matri surround the islands in lowlands, these buildings also meet characteristics of low density in low density area.
METRO LIGHT RAIL BRT MONORAIL BUS
FAST MAIN SECONDARY BRANCH
GREEN SYSTEM
SLOW TRAFFIC SYSTEM
THE BULL, LE CORBUSIER
MATRIX-PATCH-CORRIDOR
URBAN CONCEPT DESIGN 2010-2012 IN PROGRESS
EASTERN NEW TOWN
HREE IS ANDS
VALLEY PARK CITY
BRANCH PARK
SHILING ECOLOGICAL PARK
QINGLONGLAKE PARK URBAN COMMERCIAL SUB-CENTER GREEN LOOP PARK
HYBRID CITY
CREATIVE ENTERTAINMENT ISLAND ENDLESS TWINS TOWER
BRANCH PARK THE WISDOM ISLAND BRANCH PARK MEDIA PARK
ART MUSEUM CITY 0
500
1000
0
500
GREEN BAND CITY 1000
2000M
BRANCH PARK
2000M
MUSEUM ISLEND
0
500
1000
2000M
CONTEMPORARY ART VALLEY
INDUS RIA DIS RIBU ION 0
The new development is divided into 7 industry areas. 1.Media Concentrations 2.Performing Center 3.Outdoor Music Fesitival 4.New Industrial Park 5.Digital Creative Alliance 6.Museum and Art Blocks 7.Film Production Center PERFORMANCE CENTER 1.DIGITAL FILM CENTER 2.PERFORMANCE CHENTER
NO.
LAND NO.
1
R
2
C
AREA
MUSIC & ART ZONE 1.OUTDOOR MUSIC FESTIVAL FLOOR AREA PROPORTION 2.POP MUSIC AWARDS FORUM (10,000sqm)
ADMINISTRATIVE AREA COMMERCIAL AREA
ADMINISTRATIVE AREA
173.16
4.18%
COMMERCIAL AREA
225.08
5.01%
LEISURE AREA
48.21
SPORT AREA
FILM INDUSTRY ZONE 1.07% 1.MEDIA OPERATING PLATFORM 10.62 0.24%CENTER 2.FILM PRODUCTON
C
5.01%
10.62
LEISURE AREA
48.21
1.07%
13.95% HEALTH AREA
13.6
0.24% C 0.30%
SPORT AREA
10.62
0.24%
15.54%
3
F
INTEGRATED FACILITIES
110.26
2.66%
4
I
5 NEW CONTROL PLANNING
T
CULTURAL CREATIVERESIDENTIAL INDUSTRY 129.13 ROAD TRANSPORTLANDSCAPE AREA GREEN LOOP 60.45 LAND PUBLIC FACILITIES ROAD AREA 2.13 INTEGRATED FACILITIES TRANSPORT FACILITIES AREA 58.32 OTHER
29.22%
STREET AND PLAZA
824.8
19.90%
STREET AREA
814.48
19.65%
PLAZA AREA
5.9
0.13%
PARKING AREA
5.28
0.12%
7
U
14.91% MUNICIPAL PUBLIC UTILITIES AREA
8
E
WATER AREA
CULTURAL ARTS DISTRICT
29.19
8.21%
8
E
MEDIA CENTER WATER2.MODERN AREA
128.53
3.10%
3.TV PROGRAM CONTROL CENTER 1162.53 4.INTERNET EXPERIENCE CENTER PUBLIC LAND AREA 1144.58 5.COPYRIGHT TRADING CENTER CITY6.GALLERY LAND AREAAND ARTIST BLOCKS 17.95 7.MULTIFUNCTIONAL MUSEUM 4144.94
GREEN LAND AREA
28.05% 27.61% 0.43% 100.00%
STREET AREA
12.47% 2.66%
PLAZA AREA THE BULL, LE CORBUSIER PARKING AREA
GREEN LAND AREA 9
G
The new development is divided into 7 TOTAL industry areas.
URBAN CONCEPT DESIGN 2010-2012 IN PROGRESS
24.93%
1.05%
HEALTH AREA
13.6
0.30%
8.2
0.18%
EDUCATION AREA
46.93
1.05%
110.26
2.66%
OTHER AREA
28.05%
3
FAST 2.88% F METRO
4
FAST
8.2MAIN
I CULTURAL CREATIVE INDUSTRY 1.35% GREEN SYSTEM NEW CONTROL PLANNING TRANSPORT AREA
0.05% 5
129.13 60.45
26.86%
15.54% 29.22% METRO LIGHT RAIL
RESIDENTIAL BRT ROAD MONORAIL 2.66% GREEN LAND BUS 2.88% PUBLIC FACILITIES TRAFFIC SYSTEM FACILITIES INTEGRATED 1.35% OTHER NEW CONTROL PLANNING 0.18%
SECONDARY 110.26 BRANCH
INTEGRATED FACILITIES
GIVEN CONTROL PLANNING
13.95%
46.93
SLOW
T 1.30%
ROAD AREA
2.13
0.05%
824.8
19.90%
TRANSPORT FACILITIES AREA
58.32
1.30%
814.48
19.65%
824.8
19.90%
5.9
0.13% S 0.12%
814.48
19.65%
PLAZA AREA
5.9
14.91% 0.13%
8.21%
PARKING AREA
5.28
0.12%
5.28
PUBLIC LAND AREA
INDUSTRIAL DISTRIBUTION CITY LAND AREA 1.MEDIA CONCENTRATIONS 2.PERFORMING CENTER 3.OUTDOOR MUSIC FESTIVAL 4.NEW INDUSTRIAL PARK 5.DIGITAL CREATIVE ALLIANCE 6.MUSEUMS AND ART BLOCKS 7.FILM PRODUCTION CENTER
4.18%
SPORT AREA
2
6
29.19
STREET AND PLAZA STREET AREA
12.47% 2.66%
128.53
7
U 3.10%
MUNICIPAL PUBLIC UTILITIES AREA
29.19
8.21%
19.65% 1162.53
8
E 28.05%
WATER AREA
128.53
3.10%
27.61%
GREEN LAND AREA
1162.53
28.05%
1144.58
27.61%
1144.58 17.95
9
4144.94
100.00% TOTAL
EASTERN NEW TOWN
G 0.43%
PUBLIC LAND AREA CITY LAND AREA
2000M
23.50%
225.08
0.18%
MUNICIPAL PUBLIC UTILITIES AREA 1.CHINA ARTIST CENTER
12.03%
173.16
8.2
U
24.93%
498.64
COMMERCIAL AREA
EDUCATION AREA
7
1033.33
PUBLIC SERVICEAREA ADMINISTRATIVE AREA
OTHER AREA
S
RESIDENTIAL AREA
5.01%
0.30%
6
4.18%
PROPORTION
1.07%
1.05%
STREET AND PLAZA
12.03% R
1000
PUBLIC TRANSIT SYSTEM FLOOR AREA (10,000sqm)
AREA
48.21
13.6
2.88%
1
GIVEN CONTROL PLANNING
TRANSIT SYSTEM
26.86% 225.08
46.93
1.VIRTUAL EXPERIENCE COMMUNITIES 60.45 1.35% 2.MEDIA OPERATING PLATFORM ROAD AREA 2.13 0.05% 3.ANIMATION PRODUCTION CENTER TRANSPORT FACILITIES AREA 58.32 CENTER 1.30% 4.FILM PRODUCTON
NO.
LAND 24.93% NO.
23.50% LEISURE AREA
HEALTH AREA
TRANSPORT AREA
TOTAL
2
ROAD PROPORTION
173.16
EDUCATION AREA
ANIMATION INDUSTRY ZONE CULTURAL CREATIVE INDUSTRY 129.13
G
498.64
12.03%
I
9
PUBLIC SERVICEAREA
24.93%
4
S
1033.33
498.64
INTEGRATED FACILITIES
6
RESIDENTIAL AREA
1033.33
F
T
R
FLOOR AREA EXISTING ROAD NETWORK AREA (10,000sqm)
PUBLIC SERVICEAREA
3
5
LAND NO.
RESIDENTIAL AREA
OTHER AREA
MEDIA CENTER 1.CHENGDU MEDIA CENTER 2.MEDIA PARK
NO. GIVEN CONTROL PLANNING 1
500
17.95
0.43%
4144.94
100.00%
28.05%
24.93%
19.65%
E EAAS ST TE ER RNN URB NEW NEWTOWN TOWN
URBAN CONCEPT DESIGN URBAN CONCEPT DESIGN 2010-2012 2010-2012 IN PROGRESS IN PROGRESS
¥€ $ ¥€
Finallist of international competition 2014, Urban design Concept design
NINGBO ZHONGSHAN ROAD URBAN DESIGN NINGBO, RC GFA 1 0 m2
NINGBO CI
IDEN I IES
It is often the case that cities are known for a singular trait or characteristic. This is the case with many of Ningbo’s neighboring cities and provinces; cities which excel in one particular area, and therefore their identity is entirely based on one aspect of their urban environment. Ningbo, on the other hand, has an extremely rich cultural heritage, and at the same time is a highly successful contemporary city, exceling in many areas and industries; thus, the city’s identity is not singular, but instead layered.
Known as the Venice of the East, Suzhou in east China’s Jiangsu province is praised for its lush gardens and enchanting waterways. ----The Times(2011.11)
DESIGN CONCE RIPPLE EFFECT
SHANGHAI
SU Z HOU
“Shanghai is China’s largest industrial and commercial city.” ----CCTV News (2009.9)
Line 4
Line 1
Line 2
Line 3 Line 1
Huangcheng Station
Daqing Bridge Station
Tianyi Station
West Gate City Government Station Station
Jiangxia Bridge Station
Rainbow Station
Sakura Park Station
CITY IDENTITIES Ningbo is a layered city: one of China’s earliest urban settlements, the city has a strong cultural heritage, excels in many areas and industries, boasts a successful Port, welcomes domestic and foreign migrants.
HANGZ HOU
“Hangzhou is the City of Heaven, the most beautiful and magnificent in the world.” ----Marco Polo(late 1200s)
Migrant City
Historic City
Cultural City
Brand City
Entreprenurial City
Industrial City
Port City
600m radius 7.5min walk
NINGBO
SHAO ING “The city of Shaoxing is one of the first list of famous historic-cultural cities of China announced by the State Council of China.” (1982) ---China Daily(2011,6)
URBAN DE E O
Leisure City
ZHONGSHAN ROAD IDENTITIES
PROGRAM OF THE RIPPLE RADIUS
821(Tang Dynasty)
Century Boul. Station
Fuming Station
Outdoor Activity Park
Education Network
Hub of Culture & Heritage
Business District Sunken Leisure Shopping & Entertainment Plaza District
Ecological Living
Industrial Exhibition Center
DESIGN E E EN S
EN OF NINGBO
1800(Qing Dynasty)
1925 (ROC)
1935 (ROC)
1995 (PRC)
2014 (PRC)
EXISTING ARCHITECTURE
SUBWAY
outdoor activity park BC
50 0 0 - 4 50 0
8 21
1 0 0 0
1 3 8 1
1 6 0 0
1 8 4 3
1 9 1 4
1 9 25
1 9 3 5
1 9 3 9
1 9 4 9
1 9 8 4
1 9 9 5
20 0 8
education network
hub of culture & heritage
shopping & business entertainment district district
sunken leisure plaza
industrial exhibition center
ecological living
20 1 4
ACHIE ING DIFFEREN IA ACHIEVING DIFFERENTIATION Concerns have been raised over the homogeneous approach adopted by many city governments to urban development. In the race to create modern 21st century economies, most cities are pursuing very similar strategies and visions, and often have the same templates for the development of their CBDs and business zones. Policy differentiation will be a key competitive advantage for the city.
NEW ARCHITECTURE
green corridor park LANDSCAPE
plaza
street trees
park
plaza
street trees
park bridge
street trees
plaza
park
plaza street trees
wetland
TRAFFIC In reaching to grow, Chinese cities have often adopted an extremely homogeneous approach to development. Evidence of this has been published in both Chinese and Western press, pointing out that cities often aim for a generic CBD, and strip themselves of any authenticity or focus on the city’s heritage and historic culture.
1000 CITIES 1 LOOK “Originally, China had many beautuful cities. (But) they demolish everything...they built a very wide road system. Then they give it to a development company to build a high-rise apartment building. Suddenly we let every Chinese city become (a) big suburb.” ----Wang Shu
HARDSCAPE
STREET FURNITURE Finallist of international competition 2014 ,Urban design Concept design
NINGBO ZHONGSHAN ROAD URBAN DESIGN
EDUCATION NETWORK
SHOPPING & ENTERTAINMENT DISTRICT
SUNKEN LEISURE PLAZA
ECOLOGICAL LIVING
The same amount of urban substance can be configured in many different ways, from a compact Monolith to a dispersed Network.
DIUM-RISE
OUTDOOR ACTIVITY PARK
HUB OF CULTURE & HERIATGE
SEPERATE LOW-RISE
BUSINESS DISTRICT
NETWORK
INDUSTRIAL EXHIBITION CENTER Finallist of international competition 2014 ,Urban design Concept design
NINGBO ZHONGSHAN ROAD URBAN DESIGN
车库上盖与景观座椅结合 C a r p a r k c a n o p y in te g r a te d w ith la n d s c a p e s e a tin g
The same amount of urban substance can be configured in many different ways, from a compact Monolith to a dispersed Network.
ARCHITECTURAL INTERVENTION
Option 6 triangular bench_canopy same section
S opping and Entertainment District OU TD OOR AC TI V I TY PAR K
To Hangzhou Bridge
Facade Clean-Up Facade Re-Development New Building
Section A
Section B
剖面 AA
剖面 BB
C U L TU R E H U B
S H OPPI N G & B U S I N ES S EN TER TAI N MEN T D I S TR I C T
U R B AN PL AZ A
I N D U S TR I AL EX H I B I TI ON C EN TER
W ATER
ZhenhaiR ESEconomic I D EN C E Development Zone
Ningbo Higher Education Park North
Zhenhai Economic Development Zone
Ningbo Urban Industrial Zone
Ningbo Petrochemical Economic and Technological Development Zone
ISOLATED
Ningbo Hi-Tech Industrial Development Zone
B
90 m
¥€ $
立面
Ningbo Urban Industrial Zone
Ningbo Hi-Tech Industrial Development Zone
Ningbo Jiangbei Investment Pioneering Center
5m A
ED U C ATI ON & C OMMU N I TY C EN TER
Ningbo Higher Education Park North
2 1
2
GN8
DIUM-RISE
SEPERATE LOW-RISE
In this part of the city, we propose to connect the existing retail and upgrade the facades along Zhongshan Road to create a High Street; made stronger by the fact that Zhongshan Road is diverted and the path becomes pedestrian only. The High Street will feature a wide range of retail and commercial offerings, in addition to restaurants and small commercial and office space. Adjacent to the river, two plazas (one formal, and one large public space) will enhance the pedestrian experience.
NETWORK
GN7 GN9
ISOLATED
ISOLATED
ISOLATED
Eastern new central zone
CULTURAL COMPONENT Ningbo Lishe SCENARIO GRAND THEATRE
Ningbo Wangchun Industrial Park
Bonded Logistics Center Ningbo Hi-Tech Industrial Development Zone Zhenhai Economic Development Zone
St a c k i n g
Dee And Charles Wyly Theater D a lla s , T e x a s , U S A
Dubai Creek Theater D u b a i, U A E
Casa de Musica P o rto , P o rtu g a l
Zentrum Fur Kunst Und Medientechnologie (ZKM) K a r ls r u h e , G e r m a n y
Taipei Performing Arts Center T a ip e i, T a iw a n
5 7 5 S e a t M u ltifo r m T h e a tr e Administrative offices R e h e a rs a l s p a c e s C a fé G ift s h o p C o c k ta il b a r Offices C o s tu m e S h o p L o b b y S ta g e s u p p o rt a re a s P r o d u c tio n s p a c e s R o o fto p M u ltip u r p o s e S p a c e
O u td o o r E x h ib itio n S p a c e S ta g e B a c k s ta g e O u td o o r S e a tin g A r e a R e s ta u ra n t V IP L o u n g e C o n tro l R o o m Ticket Office P u b lic T o ile t
1 ,2 0 3 5 0 R e h R e c M u s E d u V IP R e s R o o 6 0 0
S o u n d A M e d ia T M e d ia M C o n te m L ib r a r y L e c tu re
2 ,0 0 0 8 0 0 S 8 0 0 S F o o d O u td o C a r P
0 S e a t G r a n d A u d ito r iu m S e a t S m a ll A u d ito r iu m e a rs a l ro o m s o r d in g fa c ilitie s ic s h o p c a tio n a l fa c ilitie s ro o m ta u ra n t f te rra c e C a r P a rk
n d V id e o L a b o r a to r ie s h e a tre u s e u m p o ra ry A rt M u s e u m H a ll
S e a t G ra n d T h e a te r e a t P la y h o u s e P r o s c e n iu m e a t M u ltifo r m T h e a te r M a rk e t o r C in e m a a rk
residential with waterfront
C OMMERC IAL RESIDENTIAL OFFIC E
academic area
tourist area
tourist area
B ssiness District
HOTEL
OU TD OOR AC TI V I TY PAR K
ED U C ATI ON & C OMMU N I TY C EN TER
C U L TU R E H U B
commercial entertainment
S H OPPI N G & B U S I N ES S EN TER TAI N MEN T D I S TR I C T
Ningbo Railway Station
C ULTURE TOURISM
7 ,7 0 0 m 2
8 ,3 8 0 m 2
2 2 ,0 0 0 m 2
3 1 ,0 0 0 m 2
HOSP ITAL P UBLIC SP AC E
4 0 ,0 0 0 m 2
P UBLIC FAC ILITY P ARK ING
ANDSCA E
Ningbo Lishe Airport
residential with canal system
Colourful Forest
Softscape
residential with green space
Yinzhou industrial zone
Yinzhou industrial zone
ISOLATED
Unlike the typical “Chinese CBD” which appears to be popping up everywhere, this zone will be an area of high-density, low-rise buildings. This configuration will allow for the lettable area needed in a CBD, while prioritizing the needs and comfort of the pedestrian and the zone’s visitors. The pedestrian paths are elaborate and connected. The proposal also includes a 100,000 square meter commercial and retail center.
The Chain----The landscape acts as a unifier, binding together the distinct street zones - the “chain” connecting the “pearls”. Focussed along Zhongshan Road as a central axis, the landscape forms a central artery and continuity for traffic and pedestrian flows. The landscape strategy seeks to enhance Zhongshan Road as an unexploited city attractor and to renovate it as a holistic topography of quality spaces cenred aroundParks people and nature.Corridors ` Pedestrian Zones Waterside Plaza Colourful Forest Softscape Waterside Plaza
leisure chill-out
Yinzhou new central zone Yinzhou new central zone
Yinzhou new central zone
P ORT AREA
Pedestrian Zones
high/low rise
W ATER R ES I D EN C E
GN11
UNDER DEV ELOP MENT
Corridors
CBD
Ningbo Lishe Bonded Logistics Center
INDUSTRIAL AREA
Parks
I N D U S TR I AL EX H I B I TI ON C EN TER
¥€ $
EDUC ATION GOV ERNMENT FAC ILITY
U R B AN PL AZ A
DISCONNECTED
GN12
GN10
GN14
Ningbo Lishe Bonded Logistics Center
Dongqian Lake Tourist & Holiday Resor
GN17
Fenghua Economic Development Zone GN15 GN19
GN16 GN9
GN18
Celebrate the river! New acces to the canal
Meeting places, playgrounds and local squares
Green and atractive promenades
OU TD OOR ACTIVITY PARK
ED U CATION & COMMU NITY CENTER
CU LTU RE HU B
SHOPPING & BU SINESS ENTERTAINMENT D ISTRICT
Hub of Culture and Heritage
Zhenhai Economic Development Zone
To Hangzhou Bridge
H b of C lt re and Heritage
Water cleaning wet land!
Market gardens
OU TD OOR AC TI V I TY PAR K
Ningbo Jiangbei Investment Pioneering Center
ED U C ATI ON & C OMMU N I TY C EN TER
C U L TU R E H U B
S H OPPI N G & B U S I N ES S EN TER TAI N MEN T D I S TR I C T
U R B AN PL AZ A
I N D U S TR I AL EX H I B I TI ON C EN TER
Direct Water Access
Street Trees
Street Trees
Pocket Parks
Pocket Parks
Public Plaza
WetlandPrimary Road
Public Plaza
Wetland Secondary Road Ningbo Municipal Public Security Bureau Traffic Police Detachment Battalion HAISHU
RAFFIC
High-Rise Apartment Cluster
Collector Road Local Road Road in 30km/h Area Pedestrian Area Primary Road Dedicated Bus Lane Secondary Road Bike Lane Collector Road
Small Factory Cluster
lished
demo
lished
demo
翠柏中学 Cypresses School
Ningbo City, Zhejiang Province, People's Procuratorate
Emerging New Office Cluster
Since Zhongshan Road does not have the role of the major east-west connection in the urban grid, and the traffic results distributed on the sourrounding networkz the road willgeather only local traffic, allowing for the reduction of the road size and the number of lanes (1+1 or 2+2 Local Road depending on the sections), where the road is kept open to traffic. Detour Route kindergareten
hotel governmental custom office
government towetr
lished
Road in 30km/h Area Pedestrian 主要干道Area Metro Exit Bus Lane Dedicated 次级道路 Bus集散道路 Stop: Bike Lane Regional Bus局域性道路 Stop: Bus along Zhongshan Road Detour Route 30公里/小时 行人区 公交专用道 Metro Exit 自行车道 U-Turn Bus Stop: Regional
Bonded Logistics Center
Detour Route Ningbo Hi-Tech Industrial Development Zone
Zhenhai Economic Development Zone
中
Metro Exit Bus Stop: Regional Bus Stop: Bus along Zhongshan Road
Western suburbs school Zemin teaching points
l
al schoo
exper
区
Ningbo Power Supply Bureau
hotel
demo
Primary Road Secondary Road Collector Road Local Road Road in 30km/h Area Pedestrian Area Dedicated Bus Lane Ningbo Wangchun Industrial Park Bike Lane Ningbo Lishe
iment
宁波��万家有限公司 Ningbo Vanguard Co., Ltd.
Bus Stop: to Bus along Junctions Zhongshan be 绕行路线 revised Road
主要干道 次级道路 集散道路 局域性道路 30公里/小时 行人区 主要干道 公交专用道 次级道路 自行车道 集散道路
隔断
High Rise Residential Tower
Electricity Office
中
区
Hub of Culture and Heritage 分离 4 3
中
Ningbo City High Tong Primary School
Ningbo Hua Ci Hospital 宁波市�慈医院
Concepts
分离
GN7 中
ISOLATED
小
分离
中
1
High-end Residential
车
隔断2
中
The first (and most important) proposal is to re-establish the central axis between the plaza to the north, through the central site of the Drum Tower, to Moon Lake in the south part of the zone. Adjacent to this main North-South axis, a number of distinct historic or cultural sites – such as the seat of Government, the Rare Book Library, and the historic Pagoda – will be connected through a number of landscape elements, paths and plazas.
中
Huge supermarket
POTENTIAL SOLUTIONS
1
Revitalize political axis by connecting green spaces
2
Connect historic structures with pedestrian corridor
3
Establish drum tower as fulctrum of axes and green spaces
4 広済中心中
回转处
Establish relationships between cultural/ commercial areas and their surrounding residential/green areas
主 中
4
PT7
4
�小
区
中
中
2
区 区中
3
中
人
需改造路口
Ningbo Railway Station
小
小
局
中
4
4 1
4
Finallist of international competition 2 2014 ,Urban design Concept design
回转处
小
中
GN7 公
GN6 人
2
需改造路口
1
4
4
公
Intervention
分离
DISCONNECTED
Ningbo Second Hospital
局域性道路 绕行路线 30公里/小时 行人区 地铁出口 公交专用道 公交站:局域性 自行车道 公交站:中山路沿线 绕行路线
4 ISOLATED
站
专
中
U-Turn Junctions to be revised
GN6
Ningbo Dental Hospital
中
学院
4
2GN5
小
Ningbo Hygine Office
Ningbo Lee Heng Kwei Secondary School
西郊幼儿园 kindergarten
技
2
PT7
Traditional Style Luxury Hotel
地铁出口 回转处 公交站:局域性 公交站:中山路沿线 需改造路口
浙江商
DISCONNECTED
1
ISOLATED
The first (and most important) proposal is to re-establish the central axis between the plaza to the north, through the central site of the Drum Tower, to Moon Lake in the south part of the zone. Adjacent Design to this main North-South axis, a number of distinct historic or cultural sites – such as the seat of Government, the Rare Book Library, and the historic Pagoda – will be connected through a number of landscape elements, paths and plazas.
公
地铁出口 公交站:局域性 U-Turn 公交站:中山路沿线 Junctions to be revised
Ningbo Hi-Tech Industrial Development Zone
Ningbo Hi-Tech Industrial Development Zone
分离
区中
Direct Water Access
Zhenhai Economic Development Zone
Ningbo Urban Industrial Zone
4 ISOLATED
High Rise Residential Tower
Waterside Promenade
WATER RESID ENCE
Ningbo Petrochemical Economic and Technological Development Zone
中
中
Waterside Promenade
IND U STRIAL EXHIBITION CENTER
Ningbo Higher Education Park North
W ATER R ES I D EN C E
¥€ $
Ningbo Municipal Public Security Bureau Traffic Police Detachment Battalion HAISHU
U RBAN PLAZ A
¥€ $
NINGBO ZHONGSHAN ROAD URBAN DESIGN Yinzhou industrial zone
Yinzhou indus zone
GREEN S UARE
HAN HA GA ERIA
AUSTRALIA
BUSAN,KOREA B a n k
D ES I G N D ES C ONI DG ES CD N D EPT ESC I ESG ON I G N I G N C N EPT ON C C ONON C EPT C C EPT EPT H o m e p lu s
Aq u a t i c Ce n t r e
We t l a n d
디자인의 프리미엄 디자인의 쇼핑 계획방향은 영역과 디자인의 럭셔리 디자인의 프리미엄 디자인의 계획방향은 쇼핑 계획방향은 쇼핑 영역의 계획방향은 영역과 프리미엄 두프리미엄 럭셔리 영역으로 프리미엄 쇼핑쇼핑 쇼핑 영역과 분리되어 영역의 쇼핑 영역과 럭셔리 영역과 두럭셔리 영역으로 쇼핑 럭셔리 쇼핑 영역의 분리되어 쇼핑 영역의 두영역의 영역으로 두 영역으로 두 영역으로 분리되어 분리되어 분리되어 In the design conceptInthe thepremium design concept and In the luxury Indesign the the In shopping design premium theconcept design concept and areas the concept luxury premium the are premium the separated. shopping premium and luxury and areas However, and luxury shopping are luxury shopping separated. shopping areasareas are However, areas separated. are 계획방향은 separated. are separated. However, However, However, 다른 별동으로 있습니다. 서로 있습니다. 조성하는 다른 있습니다. 대지에 위치에 대지에 물리적인 서로 별동으로 대지에 서로 다른 방법으로 서로 다른 위치에 조성하는 다른 위치에 두 별동으로 위치에 영역을 물리적인 별동으로 별동으로 조성하는 방법으로 조성하는 조성하는 물리적인 두물리적인 영역을 물리적인 방법으로 방법으로 방법으로 두 영역을 두 영역을 두 영역을 i n s t e a d o f l o c a t i n g t h ei n m s t e i n a d s e o p f a l o r a c t a e t i d n i n s b g t u e t i a h ln d d e s i m n t o e g i f n a i s nl s d o t o c se o n a e a f t p d l i o n a i f o c g r f e af t r tl h o e i n e c d n g m a t b t p i h u ni a n e i g l r d m st s t i e nh ipo ge n af sms rt hoa e i ent p e a sd r i e ta f b e f p t e u ,e a r i ad rle d a n dbi t n t e iu r g p d ei ls a d c b r iot nut s n gi l d os d i f i n o f tf g n he s er d e o i s n f n f i t e e pd r , e ai f a n f r e있습니다. t s d r p e i o r a n e f r t c t s ph t ae o r f s t 대지에 s t i ht e o e , f sa t h i t d e 서로 i , r s e a i tc e d t 있습니다. , i r a e c d t i 위치에 r e c t 대지에 것이 아니라, 배치하는 프리미엄 것이 쇼핑공간이 아니라, 배치하는 배치하는 럭셔리 프리미엄 배치하는 것이쇼핑영역을 것이 아니라, 쇼핑공간이 것이 아니라, 프리미엄 아니라, 둘러싸면서 프리미엄 럭셔리 프리미엄 쇼핑공간이 쇼핑영역을 구성되는 쇼핑공간이 쇼핑공간이 럭셔리 둘러싸면서 럭셔리 쇼핑영역을 럭셔리 쇼핑영역을 구성되는 쇼핑영역을 둘러싸면서 둘러싸면서 둘러싸면서 구성되는 구성되는 구성되는 relationship betweenrelationship the two parts between is relationship established; relationship therelationship two between the parts between premium isbetween the established; two the shopping parts two the two parts is the established; experience parts premium is established; is established; shopping the premium the experience premium the 배치하는 premium shopping shopping shopping experience experience experience 분리된 부분을 공간적 분리된 흥미를 부분을 통한 분리된 공간적 분리된 기능적으로 부분을 분리된 흥미를 부분을 통한 부분을 두부여하고 통한 공간적 공간의 통한 공간적 흥미를 연결동선이 기능적으로 공간적 흥미를 부여하고 흥미를 구성되도록 부여하고 두 공간의 부여하고 기능적으로 기능적으로 연결동선이 기능적으로 두 공간의 두 구성되도록 공간의 두 연결동선이 공간의 연결동선이 연결동선이 구성되도록 구성되도록 구성되도록 surrounds the luxury surrounds shopping experience the luxury surrounds surrounds shopping creating surrounds the luxury the excitement experience luxury the shopping luxury shopping and creating shopping experience suspense experience excitement experience between creating creating andexcitement the creating suspense two excitement excitement and between suspense and and suspense the 통한 two suspense between between between the two the부여하고 two the two 하였습니다. 두 영역 사이에 하였습니다. 조성된 두 보이드(Void) 영역 하였습니다. 사이에 하였습니다. 하였습니다. 공간은 조성된 두 영역 두 순환동선과 보이드(Void) 영역 사이에 두 영역 사이에 조성된 쇼핑 사이에 조성된 공간은 영역으로서의 보이드(Void) 조성된 보이드(Void) 순환동선과 보이드(Void) 공간은 쇼핑 공간은 순환동선과 영역으로서의 공간은 순환동선과 순환동선과 쇼핑 쇼핑 영역으로서의 쇼핑 영역으로서의 영역으로서의 distinctly separated parts. distinctly Theseparated void distinctly between distinctly parts. distinctly separated theThe two separated void areas separated parts. between serves parts. The parts. the void as Thea two The void between circulation areas void between serves between the space two theas areas and two the a circulation two areas serves areas serves as space serves a as circulation a and as circulation a circulation space space and space and and 역할을 함과 동시에 공간의 역할을 개방감과 함과 동시에 자연채광을 역할을 공간의 역할을 함과 역할을 제공합니다. 개방감과 함과 동시에 함과 동시에 공간의 자연채광을 동시에 또한, 공간의 개방감과 프리미엄과 공간의 개방감과 제공합니다. 개방감과 자연채광을 럭셔리 자연채광을 또한, 자연채광을 제공합니다. 프리미엄과 제공합니다. 제공합니다. 또한, 럭셔리 또한, 프리미엄과 또한, 프리미엄과 프리미엄과 럭셔리 럭셔리 럭셔리 gives the shopping areas givesopenness the shopping gives and gives areas light. thegives shopping The the openness shopping the direct shopping areas connection and areas openness light. areas openness The between openness direct and light. and the connection and light. premium Thelight. direct Thebetween The direct connection direct connection theconnection premium between between between the premium the premium the premium 쇼핑 영역 사이의 연결동선은 쇼핑 영역 방문객들이 사이의쇼핑 연결동선은 지하층부터 쇼핑 영역쇼핑 영역 사이의 방문객들이 최상층의 영역 사이의 연결동선은 사이의 연결동선은 이벤트 지하층부터 연결동선은 방문객들이 영역까지 방문객들이 최상층의 방문객들이 광범위한 지하층부터 지하층부터 이벤트 지하층부터 최상층의 영역까지 최상층의 최상층의 이벤트 광범위한 이벤트 영역까지 이벤트 영역까지 영역까지 광범위한 광범위한 광범위한 and luxury shopping and experiences luxury shopping with andthe luxury and experiences basement and luxury shopping luxury shopping and with shopping experiences event the experiences basement areas experiences with at the and the with top basement event with the complete basement the areas basement and the at event and the top and event areas complete event areas at areas theat the top the at top the complete top 도와줍니다. complete the the할활동과 the 활동과 경험을 할 수complete 있도록 활동과 경험을 수 있도록 활동과 경험을 활동과 도와줍니다. 경험을 할경험을 수할 있도록 수할있도록 수 도와줍니다. 있도록 도와줍니다. 도와줍니다. large range of activities large and range experiences. of activities largelarge range large and range ofexperiences. range activities of activities of activities and experiences. and and experiences. experiences. 판매시설이 위치한 지상의 판매시설이 각층에서는, 위치한 판매시설이 VVIP 지상의 판매시설이 엘리베이터와 판매시설이 각층에서는, 위치한 위치한 지상의 중앙으로 위치한 VVIP 지상의 각층에서는, 지상의 엘리베이터와 집중된 각층에서는, 각층에서는, VVIP 중앙으로 VVIP 엘리베이터와 VVIP 엘리베이터와 집중된 엘리베이터와 중앙으로 중앙으로 중앙으로 집중된 집중된 집중된 에스컬레이터 연결부분을 에스컬레이터 제외하고는, 고객들을 에스컬레이터 에스컬레이터 위한 에스컬레이터 제외하고는, 연결부분을 순수한 연결부분을 판매시설로 고객들을 연결부분을 제외하고는, 제외하고는, 위한 조성하였습니다. 제외하고는, 순수한 고객들을 고객들을 판매시설로 고객들을 위한 위한 순수한 조성하였습니다. 위한 순수한 판매시설로 순수한 판매시설로 판매시설로 조성하였습니다. 조성하였습니다. 조성하였습니다. The shopping floor isThe keptshopping as pure as floor The possible. shopping The is kept The shopping The asshopping floor pure operating floor isaskept possible. floor is kept support asispure kept asThe pure facilities, as asoperating possible. pure as possible. as except possible. support The operating Thefacilities, The operating operating support except support facilities, support facilities, facilities, except except except 연결부분을 C ORE 되어있으면서도, 후방시설들은 후방시설들은 직접 판매시설들과 연결이 판매시설의 판매시설들과 판매시설들과 되어있으면서도, 직접 영역과 직접 연결이 직접 분리되도록 연결이 되어있으면서도, 판매시설의 연결이 되어있으면서도, 되어있으면서도, 영역과 판매시설의 분리되도록 판매시설의 판매시설의 영역과 영역과 분리되도록 영역과 분리되도록 분리되도록 f o r t h e d e s i g n a t e d V V f o IP r t e h l e e v d a e t s o i r g s n a f n t o e d r d t h V f e o V r dc IP t e h f on s e rit l g r e d ta n h v e l a i ea s z t t i e dog d ern s sa e V i at s g Ve n c n d IPad a lV t a t e h V t d lo e e IPr vV c c a e V e o t n loIPn e t r nr v s a ea l a lcti e z o n t evi r do s a d n t a ohse n , re s s d ac c a r t e h l n a n e dp t o r u c ta r hs e l cih e n z o e te c r n d da e n l n ie z t s c re a c t d i la o i z el n a e s t d co , 후방시설들은 a r a e l rc as e o ct o n a p r n l u a c e s t o oc h n t r e i no dc en o cs 판매시설들과 n t, n i o a e n r c e s t i, op a nu 후방시설들은 r s e ,h p ae u rd 직접 e s h p e u d s 연결이 h e 판매시설들과 d 후방시설들은 외측면으로 있습니다. 외측면으로 이 배치되어 박스형태의 외측면으로 외측면으로 있습니다. 후방시설 외측면으로 배치되어 이 배치되어 영역은 박스형태의 배치되어 있습니다. 보조 있습니다. 순환동선과 후방시설 있습니다. 이 박스형태의 이 박스형태의 영역은 이 창고, 박스형태의 후방시설 보조후방시설 순환동선과 후방시설 영역은 영역은 보조 창고, 영역은 보조 순환동선과 보조 순환동선과 순환동선과 창고,창고,창고, to tol the connection outside but to the with intodirect outside the to outside shopping the connection but outside inbut direct floors. in but with direct connection inIn the direct these connection shopping connection operating withfloors. the withboxes shopping with the In these shopping the shopping floors. operating floors. In floors. these boxes In these operating In배치되어 these operating operating boxes boxes boxes c h ino odirect a r y s but i m outside Pr the 서페이스(services 서비스 서페이스(services 서비스 서비스 사무실로 서페이스(services 서비스 surfaces) 서페이스(services 구성되어있습니다. 서페이스(services 그리고 surfaces) 사무실로 surfaces) 이 surfaces) 그리고 영역은 구성되어있습니다. 그리고 사무실로 부산 그리고 사무실로 사무실로 구성되어있습니다. 이구성되어있습니다. 영역은 구성되어있습니다. 부산 이 영역은 이 영역은 이 부산 영역은 부산부산 the secondary circulation, the secondary storage, services the circulation, secondary the secondary surfaces, thestorage, secondary circulation, and circulation, services offices circulation, storage, surfaces, are storage, located; storage, services and services giving offices services surfaces, surfaces, the are surfaces, and located; offices and서비스 and offices giving are offices located; the are located; are giving located; giving thesurfaces) giving the the 그리고 C ORE C ORE C 기능적으로 ORE 한화 갤러리아 백화점의한화 관리, 갤러리아 운영팀에게 백화점의 한화그들만의 한화 갤러리아 관리, 한화 갤러리아 차별화되고 운영팀에게 갤러리아 백화점의 백화점의 백화점의 관리, 기능적으로 그들만의 관리, 운영팀에게 관리, 운영팀에게 차별화되고 최적화된 운영팀에게 그들만의 그들만의 기능적으로 그들만의 차별화되고 차별화되고 최적화된 차별화되고 기능적으로 기능적으로 최적화된 최적화된 최적화된 management and operation management team of and management theoperation management Hanwha management team Galleria and operation and of the in and operation Busan Hanwha operation team itsteam of own Galleria the team of efficient Hanwha the of in Hanwha the Busan and Hanwha Galleria itsGalleria own in Galleria Busan efficient in Busan initsand Busan own its own efficient its own efficient and efficient and and
PREMIUM
공간이 될 것입니다.
d i s t i n g u e d d o ma i n . d i s t i n g u e d d o mad i s i n t i .n d g i su t e i nd d gi s d u t o i e n ma d g u d ei o n d ma . d o i n ma. i n .
PREMIUM
N
c c o o r r e e 0 0 11
Ex i s t i n g 5 0 m
1 5 0 m
공간이 될 것입니다. 공간이 공간이 될공간이 것입니다. 될 것입니다. 될 것입니다.
전체적인 건물의 입면은전체적인 외부에 백화점의 건물의전체적인 입면은 기능과 전체적인 외부에 전체적인 건물의 쇼핑 건물의 활동을 백화점의 입면은 건물의 입면은 그대로 외부에 기능과 입면은 외부에 드러냅니다. 백화점의 쇼핑 외부에 백화점의 활동을 백화점의 기능과 그대로 기능과 쇼핑 기능과 드러냅니다. 쇼핑 활동을 쇼핑 활동을 그대로 활동을 그대로 드러냅니다. 그대로 드러냅니다. 드러냅니다.
The overall façade ofThe the overall buildingfaçade reveals The overall of The the the The overall functionality building façade overall façade of reveals façade the and ofbuilding the shopping the of building the functionality reveals building activity reveals the reveals and tofunctionality the outside shopping functionality the functionality activity and 유리블럭의 shopping and toand shopping outside shopping activity toactivity outside to outside to outside 사이 activity 틈새의 유리블럭의 반투명성은 사이 내부의 유리블럭의 틈새의 프리미엄 유리블럭의 반투명성은 유리블럭의 사이 쇼핑 사이 틈새의 영역과 내부의 사이 틈새의 반투명성은 틈새의 다이아몬드 프리미엄 반투명성은 반투명성은 내부의 쇼핑 럭셔리 내부의 영역과 프리미엄 내부의 프리미엄 다이아몬드 프리미엄 쇼핑 쇼핑 영역과 럭셔리 쇼핑 영역과 다이아몬드 영역과 다이아몬드 다이아몬드 럭셔리 럭셔리 럭셔리 world. The ‘vale’ of glass world. bricks The creates ‘vale’ world. of translucency world. glass The world. bricks ‘vale’ The The ‘vale’ of creates toglass ‘vale’ the of outside glass translucency bricks of glass bricks creates showing bricks creates totranslucency creates the translucency pure outside translucency content showing to thetooutside the the to outside the pure showing outside content showing showing the공간 pure the pure the content pure content content 쇼핑 박스의 열린 쇼핑 전체를 박스의 외부에 열린 투영할 쇼핑 공간쇼핑 박스의 것입니다. 전체를 쇼핑 박스의 열린 외부에 박스의 또한, 열린 공간투영할 열린 공간 전체를 이 유리블럭 공간 전체를 것입니다. 외부에 전체를 외부에 입면은 투영할 또한, 외부에 투영할 쇼핑에 것입니다. 이투영할 유리블럭 것입니다. 것입니다. 또한, 입면은 또한, 이 유리블럭 또한, 쇼핑에 이 유리블럭 이 유리블럭 입면은 입면은 쇼핑에 입면은 쇼핑에 쇼핑에 방해되지 않는 정도의, 방해되지 정제된 빛이 않는 실내로 정도의, 방해되지 투과하도록 방해되지 정제된 방해되지 않는 빛이 않는 정도의, 하여 않는 실내로 정도의, 더정제된 나은 정도의, 투과하도록 정제된 쇼핑환경을 빛이 정제된 빛이 실내로 하여 빛이 실내로 제공할 투과하도록 더실내로 나은 투과하도록 쇼핑환경을 투과하도록 하여 하여 더 나은 제공할 하여 더 나은 쇼핑환경을 더 나은 쇼핑환경을 쇼핑환경을 제공할 제공할 제공할 of the open plan premium of theshopping open plan of area premium theofand open the ofthe open the shopping plan ‘diamond’ open plan premium plan area premium luxury premium shopping and shopping the ‘diamond’ shopping area box. area andarea luxury This the and‘diamond’ and the façade shopping ‘diamond’ the ‘diamond’ luxury box. luxury shopping This luxury shopping façade shopping box. box. This box. This façade This façade façade LUXURY 판매시설영역의 위치한, 것입니다. 것입니다. 순수한 후방시설이 순수한 판매시설영역의 외부에 순수한 위치한 판매시설영역의 위치한, 판매시설영역의 박스들은 후방시설이 외부에 외부에 미디어 위치한, 외부에 위치한 위치한, 후방시설이 위치한, 박스들은 후방시설이 후방시설이 위치한 미디어 위치한 박스들은 위치한 박스들은 박스들은 미디어 미디어 미디어 a l s o a l l o w s f o r d a y l i g a h l t s c o o a mil l o n w g s i n f to o r a t d h l a s e yo pl i a g u l h rsl o e t o w ca s a os l h s l mi l o fo o p w nar p s gl d i l n o a f iLUXURY gow n y r t l s e oi gd n f hat o v h ty r i e r lc doi g o p an h mi u yme t r l i e cn g o gn h s mi t h i n w c o n t o p i o tg mi hp t oi h n n u e tg g o t p e d i t nu hn i s tr ev o et ui r p t sro h bu h n e ir o nme e p g s up tn h ri h n e t o e g w p s p e ih t i hn o n ov p g i u p r e o t i n n d g v me i 것입니다. s i er t o u n n n r v bt me i r iw n o i g n tn h me t o h 순수한 w u e ni t t ht d ow i s u i t t 판매시설영역의 tu h dr o b i u s i n t 것입니다. u g d r i b t s h i t n ue g r b t i h n e 순수한 g 외부에 t h e 것입니다. 파사드(Media facade)가 파사드(Media 설치되어 광고, facade)가 파사드(Media 이벤트 파사드(Media 파사드(Media 설치되어 브렌딩(event facade)가 광고, facade)가 facade)가 branding) 이벤트 설치되어 설치되어 브렌딩(event 설치되어 광고, 그리고 광고, 이벤트 미디어 광고, 이벤트 branding) 브렌딩(event 이벤트 브렌딩(event 그리고 브렌딩(event branding) 미디어 branding) branding) 그리고 그리고 미디어 그리고 미디어 미디어 overall organization of overall the shopping organization overall floors. overall oforganization The the overall shopping organization operational organization offloors. the boxes ofshopping the The ofoutside shopping the operational shopping floors. thefloors. pure The boxes floors. shopping operational Theoutside The operational operational the boxes pure boxes outside boxes shopping outside the outside pure the pure the shopping pure shopping shopping PURE C ORE 아트를 위한 장소로 제공될 아트를 것입니다. 위한 장소로 이러한 아트를 제공될 아트를 조화들은 위한 아트를 것입니다. 위한 장소로 한화 위한 장소로 제공될 갤러리아를 이러한 장소로 제공될 것입니다. 조화들은 제공될 것입니다. 현대쇼핑문화의 것입니다. 이러한 한화 이러한 갤러리아를 조화들은 이러한 조화들은 조화들은 한화 현대쇼핑문화의 한화 갤러리아를 한화 갤러리아를 갤러리아를 현대쇼핑문화의 현대쇼핑문화의 현대쇼핑문화의 floor plates are equipped floor with plates media arefloor equipped facades floor plates floor plates allowing with are plates media equipped arefor equipped are afacades clear equipped withand media with allowing designated with media facades media forfacades a clear allowing area facades allowing and for allowing for designated a for clear afor clear and a area clear designated and forand designated designated area area for area for for ORE 그 자체가 C 만들어줄 ORE 매력적인 C 앙상블 매력적인 되도록 앙상블 매력적인 그 자체가 매력적인 것입니다. 매력적인 앙상블 되도록 앙상블 그만들어줄 앙상블 자체가 그 자체가 그 되도록 것입니다. 자체가 되도록 만들어줄 되도록 만들어줄 만들어줄 것입니다. 것입니다. 것입니다. advertisement, eventadvertisement, branding and advertisement, media event advertisement, art. branding advertisement, The combination event andevent media branding event branding art. of branding both and The media will and combination create and media art. media The an art. of attractive combination The art. bothThe combination willcombination create of both an of attractive both will of both create will create will ancreate attractive an attractive an attractive r r e e 0 0 11 C c c o o ORE
e n s e mb l e o f t h e mo d e e n r n s e s mb h o p l e p io n f g t h c e u n l mo t s u e r e mb e d n e o s r lf e n e t mb h n so e s h f e lo t Ha e h mb p e o p n f i mo l n w e t hg h o e d ac f e u mo t Ga hr l tn e u d rsl mo l e e h r r o n i a dp f s .ep t h ri n n e o g p s Hap c h iu o n n l p gt w u p cr h i e n u a g l o t Ga u f c r ut e h l l t e o u r f r Ha i e a t h .o en f w Ha t h e a n Ha wGah na l l we Ga r h i a a l.l eGar i a l l .e r i a .
Bu s a n
VERTICAL CIRCU LATION _ ELEVATORS
2 5 0 m
SPLIT CORE CORE
PREMIUM
PREMIUM
CORE CORE
PREMIUM PREMIUM PREMIUM PREMIUM
LUXURY
LUXURY
LUXURY LUXURY LUXURY LUXURY
PREMIUM
PREMIUM PREMIUM PREMIUM
LUXURY
LUXURY LUXURY LUXURY
10
12 10
INTERNAL FACAD E @
8
Existing
Existing Existing Existing
Bu s a n
Bu s a n
CORE CORE CORE CORE CORE CORE CORE CORE
CORE
N
CORE
CORE CORE CORE C ORE 5 0 m
PURE
CORE
Existing
CCORE ORE CORE CORE
CORE
CORE CORE
CORE CORE CORE CORE
CORE CORE CORE c c o o r re e 0 0 1 1
PURE CORE c c o o r re e 0 0 1 1
c c o o r re e 0 0 1 1 CORE
Bu s a Bun s Bu a n s a n
PURE PURE PURE CORE CORE CORE CORE C ORE
c c o o r re e 0 0 1 1c c o o r re e 0 0 c1 c1 o o r re e 0 0 1 1
c c o o r re e 0 0 1 1 CORE
c c o o r re e 0 0 1 1c c o o r re e 0 0 c1 c1 o o r re e 0 0 1 1 CORE CORE CORE
LU XU RY _ K INETIC MIRROR
11
9
10
9
9
9
F AC AD E AS S EMB L Y
7 131106_Final Book_A3.indd 9
131106_Final Book_A3.indd 131106_Final 9 131106_Final Book_A3.indd 131106_Final Book_A3.indd Book_A3.indd 9 9 9
11/6/2013 8:36:38 PM
11/6/2013 8:36:38 PM 11/6/2013 11/6/2013 8:36:38 11/6/2013 8:36 PM
9
8
R ETR AC TAB L E POOL D OOR S C L OS ED
R ETR AC TAB L E POOL D OOR S OPEN
131106_Final Book_A3.indd 9
11/6/2013 8:36:38 PM
5 3
1
Outdoor Pool Indoor Pool Creche Outdoor Play Area Cafe /Kiosk Leisure Pool Administration Gym
try
En
2 6
4 y
Entr
I N D OOR POOL S
13
GY P SUM 1 2.5mm X 2 P l y .
OPEN AI R POOL S
OPEN AI R POOL S
SPORT PHONEBOOTH_SIGNAGE REGULAR PHONEBOOTH 1.9 X 2.2M
AVAILABLE
INSULATION IN IN METAL USE STUD WALL 1 0 0 mm
C ONC RETE P ANEL SPORT PHONEBOOTH_SIGNAGE FLOOR TO FLOOR HEIGHT1 50 mm - 1 8 7 mm
REGULAR PHONEBOOTH 1.9 X 2.2M
FIX ED IGU 4 0 mm w i t h i n EX TRUDED FRAME 27 5mm
ELEVATOR LOBBY LOGO WALL - 19F
FLAT C ERAMIC TILE 1 3 mm
1 3 mm THIC K RAISED C ERAMIC TILE 50 mm
CEN RA O ERA HOUSE
C INSE
OFFICE
SPORT PHONEBOOTH_SIGNAGE REGULAR PHONEBOOTH 1.9 X 2.2M
BEIJING,PRC
BEIJING,PRC
AVAILABLE
IN USE
SPORT BOOTH 2.4X2.45M
SOIRT PHONEBOOTH Regular phonebooth: 1.9x2.2m
Sport booth: SPORT BOOTH 2.4X2.45M 2.4x2.45m
SPORT PHONEBOOTH_SIGNAGE
OVERALL AXONOMETRIC 19F
REGULAR PHONEBOOTH 1.9 X 2.2M
AVAILABLE
IN
89
RECEPTION AREA
20F PERFORATED FEATURE WALL
SPORT BOOTH 2.4X2.45M
McKi nsey& Comp any
67
SPORT BOOTH 2.4X2.45M
89
0
场 中中 央央 歌歌 剧剧 院院 剧剧 场 22 22
5
总
平
面
图
中
央
歌
剧
5
10
OVERALL AXONOMETRIC 20F
15M
院
剧
场
25
50
LED CARPET
TEAMPOT
TEAMPOT
FRIT GL 2.2 m TEAM ROOM B
5.5 m WHITE BOARD TEAM ROOM A
2.55 m
53
FRIT GL W/ DOT TEAMRO NUMBE
WHITE BOARD FRIT GLASS