Portfolio yutingsun

Page 1

Portfolio

of Yuting Sun

Applying for Job/Intern

Artwork by Chen Qiu'an


Contents 1

Comstock Vision 2025

5

Pathway Claiborn

New Community

Open House for Comstock Township master plan update

Healthy & Complete Community Through Connection

Sustianable, Sharing, Inspiring

Intern at Williams & Works

ULI Hines Student Competition

UM/ULI Student Case Competition

Role: Urban Design, Grapic Design, Finance

Role: Concept, Urban Design, Site Plan, Rendering

January 2015

November 2014

June-August, 2015

Graduate

I

11


15

Greenway for Tianjin

23

Test Field of TOD

29

Waterfront Renovation Design

Industrial Heritage Preservation and Reuse

Land use and urban design of Qingyun area

Hangu, Tianjin

Personal/Academic Work

Academic Work

Professional Work

Role: Urban Design, Graphic Design, Finance

Role: Case Study, Part of Urban Design, Section, Rendering

Fall 2012

Summer 2013

Winter 2013

Undergraduate

II


Recreation /A Place to Play Parks, Trails, Waterfront and Open Space Comstock Township’s crowning jewels are its community recreation facilities and natural features. Community recreation facilities support healthy communities, increase property nearby values, provide important community gathering opportunities and protect natural areas from over-development. The Master Plan will include strategies about land use and development patterns that will impact where and how residents and visitors access community recreation facilities and will inform future decisions about protecting natural areas for community benefit.

53 acres

820 acres

5.8 miles

1346 acres

park/1,000 person

Celery Park

Merrill Park

Trail

Fleetwood Park

3

Township Office

Community Center 0

0.25 0.5

1

1.5

16

Jan Schau WIldflower Walk

10

Merrill Park

4

Morrow Lake Public Access

1

Neal Avenue Ballfields

2

North Wenke Park

1

Peer Park

2 40

Robert Morris Park

40

South Wenke Park

1

Water Feature

Restrooms

x x x

x

x x

x x

x

x

x

x x

x

x

x

x

x x

x

x x

x

x

270

River Villa Preserve

Fishing

x

x x

Boat Launch

x

Swimming

Disc Golf

x

x

x

x

x x x

x x x

x

x x

x x

x

x x

x x x

x x

x

x

x x

BEST PRACTICE: No resident should be more than 2 miles from a publicly-accessible community recreation facility.

Miles

N

Regional Trails

Library

x

400

Green Meadow Park

River Oaks County Park

Green Meadow Park

Park

3

Fred McLinden Nature Trails

River Oaks County Park Fleetwood Park

Morrow Lake Public Access

Cooper Park

x

Playground Equipment

Wenke Ball Fields

228

Shelter

River Villa Preserve & Jan Schau Wildflower Walk

North & South Wenke Parks

2

Chipman Preserve

Picnic

Peer Park

Celery Street Park

Basketball Court

Neal Ave. Ballfields Cooper Park Old Football Field

Softball Fields

Acerage

Chipman Preserve

water Baseball Fields

natural trail

Robert Morris Park

McLinden Nature Trail

wetlands

Nature Trails

Community Recreation Facilities

2

Population Change: 2000-2010

Age Concentrations: 5 and under

Age Concentrations: 65 and above

STEARS LAKE

BELL CAMP

LAKE

ER ER OV OV ON ON HO HO KE KE SC SC LA LA

LYONS

Kalamazoo

LAKE

Gaining

Texas Charter Township

MORROW

Portage

1

High

High

LAKE

( KALAMAZOO RIVER )

Kalamazoo River Valley Trail Comstock Township

Losing

Miles 0

0.25 0.5

1

1.5

2

Low

Miles 0

0.25 0.5

1

1.5

2

Low


Work /A Place to Thrive Urbanization, Education, Industry, Employment Comstock Township’s local businesses have national recognition. Opportunities to leverage its unique location with access to rail, road, and river, make the community desirable for employers. Through sound land use policy and community development initiatives in the Master Plan, the Township can better attract and retain employers and employees. An educated and employed citizenry supports local businesses and community services, as well as enhances a sense of community improving overall quality of life.

Employment

Employment by Industry 4.9%

2.3%

25.0% 10.0%

5.3%

15.0%

0.7%

1.6%

10.0% 5.0% Educational services, health care and social assistance: national trends indicate promising growth patterns for the next 10 years given aging population.

Arts, entertainment, recreation, accommodation and food services: these industries may continue to flourish with additional investments in placemaking.

School District Enrollment

Employed

Major Employers !

Gull Lake Community Schools

ll Gu

E G Ave

Rd

!

Compbell Lake

C

!

E H Ave

E H Ave

!

Sp rin kle

Rd

E H Ave

Comstock Public Schools

!

Lyons Lake

el

l

La

ke

!

!

E HJ Ave

E Michigan Ave

!!

Riv

er S

t

Morrow Lake

Interstate 94

I-94

E ML Ave

S 31st St

Morrow Lake

! !

E Cork St

S 33rd St

I-94

I-94

!

! !! ! ! ! ! !! ! ! Sprinkle Rd

M-96

pb

E Main St

!

King Hwy

M-96

am

N 28th St

St

Galesburg-Augusta Community Schools

!

!

6th N2

E Main St

E Main St

Unemployed

N 35th St

Urbanization 1992-2015

Retail trade: Retail follows population and disposable income. The decrease indicates a need for attracting jobs and workers.

S 35th St

2013

Manufacturing: Typical of national trends; still the second largest industry in Comstock and viable given its strategic location and accessibility.

N 33rd St

2009

Agriculture and mining: A decrease may indicate a slight shift away from agriculture in the Township as well as continued technological advancements in automation and efficiency.

N 30th St

0%

k lin id M

!

Dr

E MN Ave

E N Ave

Average acreage of open space developed annually:

224 acres

1992 Urban & Built Area: 2052 acres 2015 Urban & Built Area: 7208 acres

Average annual number of students lost or gained:

61 kids

Comstock Public Schools

BEST PRACTICE: Deliberate growth where infrastructure exists; clustered development to preserve open areas.

21.6 kids

Gull Lake Community Schools

Galesburg24.2 kids Augusta Community Schools

0

0.25 0.5

1

Institutional

Retail

Miles Light Industrial

Bedding Plant/Green House

1.5

2

2

BEST PRACTICE: Curbing “brain-drain”; consider collaborative retention models.


Mobility /A Place to Connect Walking, Transit, Biking, Driving Choice is important. In a community with an aging population, and a desire to attract and retain families to provide a workforce desirable to future employers, having choices about how to safely and conveniently move about the community is essential. Walking, biking, transit, and car travel are all viable modes. Second to housing, transportation is the most costly living expense for a family and owning a car averages $9,000 to $10,000 annually. Other safe and convenient modes like walking, biking, or transit could save money and create a more healthy and resilient community. How we connect neighborhoods and where we plan for new growth can impact the viability of these alternative modes of travel. Means of Transportation To Work Road Condition Ratings ll R Gu

d

Compbell Lake

E H Ave

NS

prin

k le

Rd

E H Ave

Lyons Lake E Main St

E Main St

Travel Time to Work M-96

M-96

Rive

r St

Morrow Lake I-94

I-94

I-94

LABEL1 Agricultural Land Forest Land Rangeland Urban and Built Up Water Wetlands

Very Good (8)

Fair (4,5)

Highway

Good (6,7)

Failed, Very Poor, or Poor (1,2,3)

Not Rated or 0

9.6 Miles Paved Shoulder

3

3.6 Miles Sidewalk

BEST PRACTICE: Increase transportation choices resulting in reduced congestion, increased safety, and less wear and tear on roads.

5.8 Miles Nature Trail

4 Lines

Transit Routes


Community /A Place to Live Population, Housing, Amenities

Median Household Income: 2010 STEARS LAKE

BELL CAMP

LAKE

ER ER OV OV ON ON HO KE HO KE SC LA SC LA

The Comstock Township community is ever evolving. People come and go, whether to live, work or play. Shifts in demographics help inform the policy directives in the Master Plan. With an aging population and a decrease in housing size (more people living alone) land use planning must account for and predict future needs. Housing types, and where housing is located, are important. Community amenities like shops and services becomes more important for an aging population.

LYONS LAKE

High

MORROW

LAKE

( KALAMAZOO RIVER )

Housing Diversity

Low

Median Age of Home: 2010

Older

LL PBE CAM

E LAK

Community Amenities RR VVEE OO NN OO OO HH KKEE SSCC LLAA

Newer

Median Home Value: 2010 LYONS

1/4 mile Legend (5 min. walk)

Compbell Lake

LAKE

STEARS LAKE

Geocoding_Result_Clip1

E H Ave

E H Ave

BELL CAMP

Primary__1 Lyons Lake

LAKE

ER ER OV OV ON ON HO HO KE KE SC LA SC LA

1/2 mile <all other values> (10 min. walk)

LYONS LAKE

Banquet Rooms E Main St

E Main St

Higher

Brewers (Mfrs) Coffee Shops

MORROW

Convenience Stores

LAKE

( KALAMAZOO RIVER )

Department Stores M-96

M-96

756m

MORROW

Food Products-Retail Grocers-Retail

LAKE

Halls & Auditoriums

( KALAMAZOO RIVER )

Morrow Lake I-94

Hotels & Motels Ice Cream Parlors

I-94

I-94

Lower

Education Attainment: Bachelor or Higher

Liquors-Retail Meat-Retail Restaurants Service Stations-Gasoline & Oil Variety Stores

2010-2013

-24 BELL CAMP

% Increase

LAKE

ER ER OV OV ON ON HO KE HO KE SC LA SC LA

Pizza

STEARS LAKE

102 LYONS LAKE

102

% Decrease

Warehouses-Cold Storage -35

BEST PRACTICE: Provide diverse housing types in close proximity to services and where infrastructure and roads are in-place to avoid costly utility extensions.

MORROW

LAKE

( KALAMAZOO RIVER )

Higher

Lower

4


PATHWAY CLAIBORN ULI Hines Student Competition

Advisor: Margaret Dewar Collaborator: Caitlin Jacobs, Hyun SeongMin, Youngmin Kang, Erika Rubino Role: Urban Design, Graphic Design, Finance Professional, January 2015

HEALTHY & COMPLETE COMMUNITY THROUGH CONNECTION

5


ISSUE IDENTIFICATION

HEALTHY & COMPLETE COMMUNITY THROUGH CONNECTION

Low-Income People Our site is currently occupied by medium and low income people. Our development should be able to provide them with a livable community.

Open Space T h i s de velopment t a k e s adv a nt a ge of t he L a f it te Gre enw ay a nd L ou i s Armstrong Park and builds a connection between them through the creation of additional park space and a thriving new community center.

ble

rda Affo

Economy The new hospital complexes provide a great opportunity to promote the local medical business and commercial.

HEALTHY & COMPLETE

Culture The multi-cultural settlement is one of the most important assets of New Orleans. Our development plan should be able to take advantage of it, also promote it.

Accessible

Housing Complementing the nearby Faubourg Lafitte Development and the Iberville redevelopment , t he new resident ia l housing will support a mixed-income community that welcomes current and new residents, hospital employees, and medical students into the community.

Vigo

rous

Neighborhood Located at the conjunction of several promising community programs, this development will serve to connect different pieces of the community together and enhance the entire neighborhood.

Public Transit

Mixed Use

Tourism

Based on t he good public tra nsit system including streetcars and buses, we encourage pedest ria n f riend ly development by providing safe sidewalks and bike lanes, building the passways through the hospital, the greeway and the parks.

Wit h t he hospita l complex a nd evolv i ng housing developments acting as a nearby catalyst, the future development will create spaces where members of the communit y can work, live, eat, and play together, adding economic vigor and community vibrancy to a promising neighborhood.

Tourism has emerged as a major industry that capitalizes on the distinct culture of New Orleans. The close proximity to both the French Quarter and Louis Armstrong Park brings opportunities to take advantage of New Orleans culture and entertainment and connect the North Claiborne community to these tourist attractions.

SITE ANALYSIS Mid City/Audubon Lower Ninthward

te ra

n Hos p

it a

ub

ourg Lafi tt e

Ib

e rv

ill e R e d e

ve

si t

Affordable

.L

o u is C e m e

te

Vigorous

C

en

tr a l B u si n e

ss

Fr

en

c h Q u a rt e

r

Di

t

s p it a l

s t ri c

Ho

ry

St

g

rk

e U n i v er

A m s tr o n

e nt

v e l o p m e nt

la n

y

Tu

u is

pm

De

Accessible

Lo

lo

Fa

l

Ve

Pa

Centilly/New Orleans East Area

Greenwood Cemetery/City Park

6 Uptown Carrollton

I 10 Highway Streetcar line Bus line

Streetcar stop Bus stop


SCENARIOS Commercial Program Parking space Medical space Residential Program

8:00 AM 12:00 PM 18:00 PM 20:00 PM 22:00 PM School

Community Center

Bridge

Amphitheatre

Gallery

Bike Rental

Bars

Grocery

Parking Structure

RV Resort Park

Skate Park

Parking Lots

MF house/restaurant

MF house/restaurant

Hotel

Restaurant/Apt

Restaurant / shops

Parking Structure

Education Program

Medical Office

Park

Robert, Lesley; traveler

Robert came for the annual jazz musical event in Louis Armstrong park, driving his RV with his girlfriend. They also want to rent a bike to visit the French Quarter and the greenway. They enjoy coming back in the evenings and visiting restaurants and bars in the St. Peter St district. John; veteran

John has to come to the VA Hospital twice a month for appointments. He likes to come early and get breakfast or lunch on N Derbigny St to go and then walk over the park and eat outside before heading to the hospital. When he has later appointments in the day, sometimes she will meet friends afterward for dinner or a drink in St. Peter St district before going home.

Lexi; student nurse Living in the apartment near the greenway, ahe bikes to work at 7 am. Lexi walks out on N Derbigny St for lunch break sometimes with co-workers. After work, she goes out on either N Derbigny St. or St. Peter St district with friends. Sometimes she need to her professor's private office across the street.

Hospital Visitor - Pat and Lauren

Pat and Lauren spent a lot of time at the hospital complex to visit Lauren's sick mother They stay at the hotel on N Derbigny St. Everty morning, they go to the flower store to get a bunch of flower for her mom. In the evenings, when they've been there all day, they enjoy taking a walk together in the greenway.

Lisa; young parents Lisa drops off her child at school, before going to work at a restaurant as a waitress. Her child takes advantage of dance lessons after school at the community center across the street until she gets off work and then they walk home to Iberville. On weekends, they often go to the playround in the park or rent a bike. Her son loves the ice gream there.

Denny; musician Denny used to be a street proformer. He now plays music in a band for concert in the Amphitheatre each weekend. He lived in Iberville. He can keep a house when it being redeveloped.


SITE PLAN

20

2

10 2 8 21 19

11

2

8

18 12

9

8

17 14

3

6 4

12

7

15 13

5 16

2

3 1

SITE PLAN 1. medical office 2. MF houses 3. parking structure 4. 2F houses 5. commercial center 6. community square 7. boutique shops 8. retail/residential 9. hotel 10. sports field 11. skate park under highway 12. parking lots under highway

13. grocery 14. bike rental 15. fountain square 16. community center 17. amphitheatre 18. gallery 19. bar 20. office 21. bridge

8


Exsiting Land Use

2F residential MF residential neighborhood business general commertial light industrial park

Proposed Land Use

Connectivity

residential retail/residential retail/office commertial institution school parking structure green space

Pathway Claiborne

FINANCE

commercial connection cultural connection green connection traffic connection walk path bike loop

healthy & complete community through connection 157345 157345

Worksheet:

SUMMARY/PROJECT OVERVIEW

Project Name: Pathway

Location: New Orleans, LA Analysis Type: All Phases

Phase 1 IRR Equity Total Development Costs

STREET SECTION

16.88% $ (17,398,942) $ (69,588,942) Investment

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Income from rent

Ͳ

6,368,116

6,495,479

6,625,388

6,757,896

6,893,054

7,030,915

Vacancy / Collection Loss

Ͳ

(4,457,681) (1,623,870) (530,031) (540,632) (551,444) (562,473)

Total Rental Revenue

Ͳ

1,910,435

Ͳ

(70,785) (235,950) (240,669) (245,482) (250,392) (255,400)

Revenues

4,871,609

6,095,357

6,217,264

6,341,610

6,468,442

Operating Expenses Property Taxes Management Fee (3%)

Ͳ

(57,313) (146,148) (182,861) (186,518) (190,248) (194,053)

Other MultiͲFamily Expenses

Ͳ

(256,000) (512,000) (652,800) (665,856) (679,173) (692,757)

Payment to State (1% of Revenues)

Ͳ

Ͳ

Total Expenses

Ͳ

(384,098) (894,098) (1,076,330) (1,097,856) (1,119,813) (1,142,210)

Net Operating Income

Ͳ

1,526,337

3,977,511

5,019,027

5,119,408

5,221,796

5,326,232

Net Cash Flow

$ (17,398,942) $ 1,288,837

$ 3,740,011

$ 4,776,777

$ 4,872,313

$ 4,969,759

$ 42,133,780

Ͳ

Ͳ

Ͳ

Ͳ

Ͳ

Phase 2 IRR Equity Total Development Costs

25.63% $ (25,002,141) $ (99,992,141) Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Income from rent

Ͳ

15,155,106

15,458,209

15,767,373

16,082,720

16,404,375

16,732,462

Vacancy / Collection Loss

Ͳ

Investment

(10,608,575) (3,864,552) (1,261,390) (1,286,618) (1,312,350) (1,338,597)

Revenues

Total Rental Revenue

Ͳ

4,546,532

Ͳ

(70,785) (235,950) (240,669) (245,482) (250,392) (255,400)

11,593,656

14,505,983

14,796,103

15,092,025

15,393,865

Operating Expenses Property Taxes

7ft

8ft

13ft

13ft

10ft

Management Fee (3%)

Ͳ

(136,396) (347,810) (435,179) (443,883) (452,761) (461,816)

Other MultiͲFamily Expenses

Ͳ

(1,280,000) (2,560,000) (3,264,000) (3,329,280) (3,395,866) (3,463,783)

Payment to State (1% of Revenues)

Ͳ

Ͳ

Total Expenses

Ͳ

(1,487,181) (3,143,760) (3,939,848) (4,018,645) (4,099,018) (4,180,999)

Net Operating Income

Ͳ

3,059,351

8,449,897

10,566,134

10,777,457

10,993,006

11,212,866

Net Cash Flow

$ (25,002,141) $ 2,895,851

$ 8,286,397

$ 10,399,364

$ 10,607,352

$ 10,819,499

$ 78,149,063

Ͳ

Ͳ

Ͳ

Ͳ

Ͳ

Phase 3 IRR Equity Total Development Costs

10.01% $ (16,748,011) $ (41,098,011) Investment

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Income from rent

Ͳ

1,691,452

1,725,281

1,759,787

1,794,982

1,830,882

1,867,500

Vacancy / Collection Loss

Ͳ

(1,184,016) (431,320) (140,783) (143,599) (146,471) (149,400)

Total Rental Revenue

Ͳ

507,436

Ͳ

(70,785) (235,950) (240,669) (245,482) (250,392) (255,400)

Revenues

1,293,961

1,619,004

1,651,384

1,684,412

1,718,100

Operating Expenses Property Taxes Management Fee (3%)

Ͳ

Other MultiͲFamily Expenses

Ͳ

(25,600) (51,200) (65,280) (66,586) (67,917) (69,276)

Payment to State (1% of Revenues)

Ͳ

Ͳ

(15,223) (38,819) (48,570) (49,542) (50,532) (51,543)

Total Expenses

Ͳ

(111,608) (325,969) (354,519) (361,609) (368,842) (376,219)

Net Operating Income

Ͳ

395,828

967,992

1,264,485

1,289,774

1,315,570

1,341,881

Net Cash Flow

$ (16,748,011) $ 232,328

$ 804,492

$ 1,097,715

$ 1,119,669

$ 1,142,062

$ 31,755,024

Ͳ

Ͳ

Ͳ

Ͳ

Ͳ

Phase 4 IRR Equity Total Development Costs

5.98% $ (11,933,270) $ (25,843,270) Investment

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Income from rent

Ͳ

1,172,420

1,195,869

1,219,786

1,244,182

1,269,065

1,294,447

Vacancy / Collection Loss

Ͳ

(820,694) (298,967) (97,583) (99,535) (101,525) (103,556)

Total Rental Revenue

Ͳ

351,726

Ͳ

(70,785) (235,950) (240,669) (245,482) (250,392) (255,400)

Revenues

896,902

1,122,203

1,144,647

1,167,540

1,190,891

Operating Expenses Property Taxes

9

10ft

3ft

15ft

15ft

6ft

6ft

8ft

10ft

Management Fee (3%)

Ͳ

(10,552) (26,907) (33,666) (34,339) (35,026) (35,727)

Other MultiͲFamily Expenses

Ͳ

(25,600) (51,200) (65,280) (66,586) (67,917) (69,276)

Payment to State (1% of Revenues)

Ͳ

Ͳ

Total Expenses

Ͳ

(106,937) (314,057) (339,615) (346,407) (353,336) (360,402)

Net Operating Income

Ͳ

244,789

582,844

782,588

798,240

814,205

830,489

Net Cash Flow

$ (11,933,270) $ 81,289

$ 419,344

$ 615,818

$ 628,134

$ 640,697

$ 17,841,957

Ͳ

Ͳ

Ͳ

Ͳ

Ͳ


PHASING

Phase 1. (33706,900 SF)

Phase 2. (311,604,600 SF)

Market Rate Residential

1,068,030 SF

Market Rate Residential

Affordable Residential

66,752 SF

Retail/Office

10,968,441 SF

Office

Parking

814,910 SF

Landscape

89,615 SF

Phase 3. (18,257,900 SF)

Phase 4. (41,508 SF)

2,339,503 SF

Grocery

177,339 SF

Market Rate Residential

Affordable Residential/Retail 205,417,378 SF

Community Center

234,347 SF

Affordable Residential

195,143 SF 49,068 SF

787,864 SF

Amphitheatre

34,530 SF

Retail/Office

1,888,118 SF

Grocery

10,391 SF

Landscape

10,124,451 SF

Hotel

123,828 SF

Parking

128,996 SF

Landcape

8,062 SF

10


=

=

11


STAKEHOLDERS Residents - Nearby Neighborhood The people who live near this project, in developments such as the Martin Lurther King Apartment, the MacDonald Square Apar t ments, a nd t he new in Orlea ns Landing. These residents will need basic needs which include dining, entertaniment, and shopping.

Working People - Young Professionals The people who work near the project at employment centers such as the GM Renaissance Center, US Boarder Patrol,or downtown. These young professionals will need nearby places to recreate and dine, in a thriving urban environment.

Developers - Real Estate developers Real estate investment in Detroit is at an all time high. Developers know that there are housing shortages in key areas such as Downtown and the Riverfront. - Entrepreneur Entrepreneurs are looking for valueadded locations to market their goods and ideas. A 24/7 destination will ensure a constant supply of customers.

Public Sectors - City of Detroit The Cit y Council and Cit y Administration are responsible to enforce laws and ensure city services. Dense living environments mean less money and time is spent per person. - M ic h iga n E c onom ic D e velopment Corporation This agency aims to revitalize unused sites and increase tax revenue for the state.

12


13


MARKETING STRATEGY Young Families

Young Professions

P o s t e r s o n n e w c o m m u n i t y, Virtual Billboards at GM , showing attracting the young families to t he you n g profe s sion s t he ne w move into a new urban style. commercial places where they can enjoy their free time near workplace.

Small Business

Outdoor Lovers

Partner with Michigan Economic P o s t e r s o n n e w c o m m u n i t y, Development Corporation to reach attracting the young families to small bussinesses, provide them the move into a new urban style. most reasonalble rental prices

Travelers P o s t e r s o n n e w c o m m u n i t y, attracting the young families to move into a new urban style.

MARKETING FEASIBILITY Category Residential

Retail Commercial

Site Elements

What Detroit Offers

What New Community Offers

Lofts, condo, Apartments and low-income housing

- Orleans Landing Apartment aross the Riopelle Street - State Parks and adventure center - Enough working oppotunities created by GM and downtown

- Enough food, shopping and entertainment right for the residents - neighboring families can share the public space and other commercial activities - Perfect location and resonable price will attract both families and young professionals

- Restaurants - Pop-up shops - Shops

- Orleans Landing Apartment aross the Riopelle Street - Potent ia l C onsu mers nea r GM renaissance center and downtown

- Good location near downtown area and waterfront - Walkable interior and comfortable environment - Shops highlight small bussiness - Provide a New Retail Center in the neighborhood

- Office Space

- Booming Car Industry development - Reasonable rent for any new cooperations to start their bussibess including the GM renaissance center and - create the gathering effect for the car industry other car dealer cooparations

14


Greenway for Tianjin

Industrial Heritage Preservation and Reuse Advisor: Dan Li, Xiaoyu Zhang Personal/Academic Work Professional, 2013 Winter Basic materia from Tianjin Urban Planning & Design Institute

China has been through rapid urbanization in these recent decade. The modern development is carving into the the industrial districts surrounding the city. This happens more in the large industrial cities particularly, like Tianjin, which was used to be one of the major industrial center across the country during the 1910s - 1950s. The industries are retreating to the newly established Binhai New Area considering the deterioration of liv ing env ironment a nd high cost of economica l invest ment, leav ing a huge a mou nt of va luable i ndust r ia l her itage behind. Chentang railway, which connected Tianjin We s t R a i l w ay S t a t i o n w i t h C h e nt a n g Industrial Park, once searve as the main rail artery in the central city. It will be out of use in 2015 according to the new zoning code. Since it links several big factories with high industrial value, the idea of Greenway for Tianjin came out in the recent years. The Green Way proposal expands the idea of industrial renewal. The final goal is to create a green belt inside the city, maximizing the beneficial public impacts of industrial and ecological heritage.

15

Green belt The green belt contribute certain urban ecology value by providing a continuous linear green space.

Industrial memory The old factories witnessed the history and development of the city and should be preserved.

Public infrastructure The community facilities and transformed factories provides recreational use for citizens.


Tianjin Railway History

CHENTANG RAILWAY starts with TJ Western Railway Station and ends up in Chentang Industrial Park, covering almost a quarter of the central city. There are many parks and cultural infrastructure surround it, which could be linked together and form a system by the Greenway. Many of the land beside the railway has developed into residence, but still a huge mount of land remain Industrial blocks and unused.

1881- Tangshan Railway The first railway in China

1888- Tianjin Railway Directed by Zhan Tianyou

TJ Western Railway Station TJ Railway Station Green Water Park

1888- Tianjin Railway Station The first comprehensive station

1911- Jinpu & Jingfeng was connected in Tianjin The initial railway network established

1918- The first primary and middle school of railway workers

1931- Beining Park The first recreational park for railway workers

1958- Chentang railway At the service of Chentang industrial park

TJ Tractor Factory Houtai Wetland Park

TJ Culture Center

Tianjin Water Park

Tianjin City Hall Chentang Industrial Park

Nanping Green Park

Tianjin Tower Olympic Center MJ Convention & Exhibition Center

Transportation hub Industrial land

Residence land Green space

Commercial land Unused land

Existed Subway Planning Subway

16


Approach Phasing of GREENWAY FOR TIANJIN 2 Years

4 Years

Step 1: Access & Vegetation

Add access to railway & improve the vegetation surround

8 Years

Step 2: Entertainment

Improve the recreation facilities in the residential section

10 Years

Step 4: Industrial Renewal

Preserve & redevelop the 2 industrial sites

Step 5: Regional Ecosystem

Reconstruct the wetland and repair the broken links

Tiantuo Chentangzhuang

Final

N Years

4 Kinds of Reconstruction

Add access to railway & improve the vegetation surround ecological protection recreation space cultural rebuilt multi-function reconstruction

17

Final: Green Way circle

Complete the circle when another half of railway is out of use in the future

Step 3: System

6 Years

Complete the pedestrian & bicycle system

12 Years

Step 6: Green Way

Complete the Chengtang Green Way


Existing Residential Public service Rail way

Industrial Green spce River

unused land

Proposed Strategy 1: Eco-system re-design Natural eco-green belt Vegetation repair vegetation rebuilt

Strategy 2: Connected with people Industrial site Recreation facility location Pedestrian & bicycle trail

Tiantuo Creative Park

Houtai Wetland Park

60 0m

Chentang Loft

Waihuan Wetland Park

27km

N 0

1 Km 2 Km

4 Km 18


2. Eco-recreation 1. Rest place for animal

Giving chance for ecotrip inside city and get close to nature

3. Gathering place Back yard garden for residents surround the railway. Promoting communication among communities, especially for children and the old

Theme parks in waterworks and museums in old factories.

Providing a piece of habitat for animals in the city

ecological protection

19

4. Non-profit public facilities

recreation space

cultural rebuilt

5. Ecological detention Transforming memorable industrial parks into cultural and creative Parks, protectively develop the industrial heritage for cafeteria, loft, gym, etc.

multi-function reconstruction


Urban Design of

N

Tianjin Tractor Factory

Coach Station Factory Building

Location

Factory Building

State Grid

Factory Building

Trees

Railway

Subway Station

Traffic Reorganization

Preserved Buildings & Vegetation

New Residential & Commercial Construction

Land use

commercial education

residential factory bldg

20


N 0

Users office worker

50m

Active Density 6

8

visitor & customer 21

22

10 6

8

22 18

9

Full-time Occupied

Activities 17

artist resident

200m

21

6

working, dining, relaxing painting, exhibition, producing exercising, purchasing

22

dining, shopping, visiting

9

14

18

21

22


Original Frame

Te

ng ac h i

Add Walls and Floors

Divide Space

d i ng Bu i l Common Room Dinning Hall, etc Classroom

Original Factory

Add Floors and Rebuilt Walls

Build up Connections

Ga ller y

Big Art Works Small Art Works

Loft

Original Big Workshop

Cut in the Middle

Bridges

Make Differences

Office Building Common Rooms

Loft

Streets in Creative Park

Landscape of Railway

22


Test field of TOD Advisor: Jinli Li, Dachang Yuan Collaborator: Yang Zhao, Lei Jing, Jingyi Zhang Role: Site Analysis, Conceptual Analysis, Land Use, Part of Urban Design Academic, 2012 Fall

The maijor cities are undergoing rapid population growth due to the rapid urbanization. The new technologies of transportation like expressway, viaducts, and intercity train are favorable and adopted as solutions to fast means of commuting within and between cities. The quality of people's life, however, is severely compromised when the expressway and viaducts cut the city apart, and the rich and poor are segregated. Urban villages are formed with little public facilities and transportation access in some areas. we then proposed the TOD for the site, which already proved successful in many cities overseas. This might be the testfield for improvement in terms of land use and public transit in a greater range.Although the backgrounds of TOD are slightly different, it is still a promising method to promote the the social equity and public heal in general.

23


用地现状图

Site Analysis Status Quo

The site is cut apart into 4 parts by the 2 expressway and the railway, and they are isolated from each other. The northeast part is Shuimutiancheng residential area with comfortable houses and good environment. The northwest part is mainly occupied with factories. The other two parts on the south are full of urban villages and vacant land. The South Canal passes through these parts, making them of potential good living environment.

Land Use Miyun Road

outer ring

Express way

Beichen district

Xiqing

Xiqing district

Hongqiao district

Railway

Xiqing

Road

Miyun

center of the city

Planning subway station

Road

Nankai district

The planning site locates in the edge of the central city.

The land belongs to 3 different districts, thus the administrative influence is weak.

Viaduct

The site is very close to TJ West Station, the sub-center of the city, and is divided by express way and railway. 2 subway station is on the plan now.

Living Condition

Transportation

Quality of Building

good fair poor very poor green space water

Conflicts

Pollution & Unused land

Tianjin West Station

Road

residence village commerce school public service industry green space municipal utility unused land

Industty

Traffic & Road

express way main road secondary road branch road

24


00m R=2 00m R=2

R= 40 0m

The site with problems below desperately need change and renewal to improve the general public health. The coming opportunity of planning subway stations make it the best test field of TOD community, which help promoting public transportation, close neighborhood and energy efficiency.

R= 40 0m

Planning Strategy 0m 80 R= 0m 80 R=

00m

Fast urbanization process

TOD Test Field

R=2

Terrible living condition

Solution

00m

Energy Deficiency

Opportunity

The planning subway station

R= 40 0m

Complex Land use

R=2

Problems

Viaduct & Expressway

R= 40 0m

Commercial prototype

0m 80 R= 0m 80 R=

Residential prototype

m

25

0 80

Ecological recovery

R=

Diverse waterfront

m

Large-scale open space

0 40

Program mix

00 m

TOD community 50

Human scale Social life Public safety Public health Accessibility Traffic improvement Reduce commuting Waste reduction Energy Efficiency Water saving Recreation Education Environmental awareness Micro-climate improvement Air quality Water quality Habitat Self sustaining Place identity Employment opportunity Land value

Projects

R=

Urban compactness

Benefits

R=

Goals

Public green space

Subway - Bus Network

Subway surrounding commerce

Regional Transit Network


Urban Design

Land Use

46.5%--197.6ha

9.4%-----40ha 11.4%---48.5ha 1.9%-----8.1ha 30.8%---130.9ha

residence commerce school administration cultural falility sports hospital warehouse parking & station municipal utility green land green buffer intercity transportation

N 0

200m

800m 26


Analysis of 2 TOD Blocks Formation At the subway station, we propose 2 TOD blocks. The first one is the combination of commercial and residential type. The second one is the commercial type.

80

80

27

0m

0m

Status quo

Road network

Land use

Open space network

Urban design

Existing building & retained building

Respecting the existing roads and streets

Inc. residential, residential/retail, retail/office, green space

Inc. linear park combined with rivers and green spots

Design intention


Block Development 25 0m

Retail/office

30

0m

Block

Podiums

Towers

Medium Height

High Rise

m

0 10

Block

m

30 0m

Residential

Towers

0 35

Retail/residential

Podiums

m 150

Block

28


Waterfront Renovation Design Hangu, Tianjin

Advisor: Jinli Li Collaborator: Yizhen Wang Role: Case Study, Part of Urban Design, Section, Rendering Professional, 2013 Summer

29


Ji Canal

Hangu

Hangu New Town

City Center Core

Waterfront Area in the cener of new town

Teda Hangu Devision

Sino-Singapore Tianjin Eco-city

Binhai New Area of Tianjin

Aircraft Carrier Park

Hangu

Hangu New Town

The planning site locates in the center of Hangu New Town, so the waterfront is much more valuable and important than other area. The environment on both sides of the river is good. But the only problem is that the required flood-prevention level is much higher than the ordinary water level and the ground level.

Site Analysis

West of the River Current Problem 4.8m

Floodwall 1.0m

25 0 m

1.5m

Solution J I C A N A L

Hexi Park

The heigh slope of floodwall prevent people from getting close to the riverfront

Add a new track down the slope, making it possible for people to either get close to the river or watch it on the bank.

Riverfront Park

East of the River Riverfront Square

Current Problem 4.8m 1.5m

2.2 k m

Riverfront Park

Solution

2.0m

The unwalkable straight floodwall directly prevent people from seeing the river. Widen the bank to create a platform for sightseeing with commercial services below. Also add a new track close to water. 30


Short Term of the East

A

Long Term of the East

The east of the river is the old town right now and was planned to rebuild in the future. So the riverfront can connect to the near blocks overhead, organizing a tree-dimensional traffic and eventually magnifying the vitality of riverfront.

A

The tend of human-controlled growth merging Section A-A

B

31

B


Floodwall

Walk Path

West of the River

Building

East of the River 5.5m

5.5m Current floodwall

1.5m

1.5m

5.5m Current floodwall

5.5m 1.5m

1.5m Current floodwall

Section B-B

32


Other works

Overall Planning of Xiuwu, Henan Advisor: Xiaoyu Zhang Academic, 2013 spring

33

Boyu New Area in Weihai, Shandong Advisor: Xiaoyu Zhang Academic, 2012 fall

Disaster Prevention Design for UA Competition

Urban Design in Tianshui, Gansu province

Advisor: Peng Zeng Academic, 2012 fall

Advisor: Xin Hou Academic, 2012 spring


Residential Design Advisor: Xifang Xing Academic, 2011 fall

Dynamic Skin Construction Advisor: Zhantang Miao Academic, 2011 spring

Surveying and Mapping of Eastern Tombs of the Qing Dynasty Advisor: Peng Cao Academic, 2011 summer

Villa Design Advisor: Yan Li Academic, 2010 fall

34


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.