YAN ZHENG Selected Works 2017 - 2021 Architectural Designer Rafael Viñoly Architects
RESUME
YAN ZHENG Licensure Candidate
CONTACTS 415.463.9609 yzheng2019@gmail.com Los Angeles, CA
SKILLS
Design/Modeling Revit Rhinoceros Grasshopper
Drawings/Documentation Revit Rhinoceros Auto CAD Adobe Creative Suite
Visualization
Vray Enscape Adobe Creative Suite After Effects
Organization/Communication Microsoft Office
ACHIEVEMENTS 2019 Integrated Product Design Certificate from PennDesign 2018 Projects featured in 2018 PennDesign publication Pressing Matter VII 2017 PennDesign Thomas C Lehman Memorial Fellowship Fund
REFERENCE
Ruth Xing, Supervisor Architect, RVA rxing@vinoly.com 408.807.7570 John Frane, Supervisor Design Principal, HGA JFrane@hga.com 310.666.8178 Matthew Austin, Supervisor Senior Architect, HGA MAustin@hga.com 401.369.5196
PROFESSIONAL EXPERIENCE Architectural Designer, Rafael Viñoly Architects August 2019 to Present | Cupertino, CA
Vallco Town Center Finished 100% DD package in Revit for the 50-acre mixed-use affordable housing project on North Wolfe Road, Cupertino Incorporated design changes into Revit models of 11 building blocks and the world’s largest accessible green roof Led the interdisciplinary coordination for two residential blocks during CD Led the production of life safety drawings during CD Modeled and documented 2,402 residential units and kept track of the project areas to make sure they complied with SB-35 requirements Prepared drawings for presentations with clients
Architecture Intern, HGA Architects and Engineers Summer 2018 | Santa Monica, CA
Saddleback College Competition Designed the physical model to achieve a gradual landscape and coordinated with a remote office to manufacture the model Prepared a series of story-telling renderings and drawings for the presentation JAMS Marketing Effort Prepared composite drawings to capture and showcase the key concepts of the project as marketing materials for the LA Office Apple Office Renovation Assisted in programming studies and prepared floor plan layout iterations
Architecture Intern, HGA Architects and Engineers Summer 2016 | Santa Monica, CA
Hollywood Arts Collective Prepared drawings and renderings for the winning competition proposal Met with stakeholders to understand and incorporate different perspectives into the design Apple | Beats Office Renovation Prepared iterations of collage renderings for interior material studies and assisted to finish the CD report in Revit
Architecture Intern, China IPPR International Engineering Co., Ltd. Summer 2015 | Shanghai
Puyu Elderly Welfare House Assisted in design refinement at DD and prepared the presentation report
EDUCATION
Master of Architecture University of Pennsylvania, Philadelphia, PA 2017 - 2019 | 3.8 GPA Bachelor of Science in Architectural Studies University of Southern California, Los Angeles, CA 2013 - 2017 | 3.7 GPA Magna Cum Laude
PORTFOLIO/ LINKS https://issuu.com/yzheng19/docs/portfolio_2020 https://www.linkedin.com/in/zheng-yan https://youtu.be/BJHoA50lNwY - “Highway to Resilience“ Research Movie
CONTENTS
4
PROFESSIONAL
Vallco Town Center Saddleback College ATAS Building
06 24
ACADEMIC
MEGA-Block REDUX The Oasis | EWR Landside Terminal Food, Farm, Flushing Material Assemblage | Wall Section
30 44 56 68
MISCELLANEOUS
Product Design | “likes“
70
5
Professional
1 Vallco Town Center Rafael Viñoly Architects Cupertino, CA “The vision is to revitalize the aging and outdated indoor mall into a vibrant, sustainable and walkable Town Center neighborhood and community gateway with a mix of retail, entertainment, recreation, employment, housing, and open space, all integrated with a publicly accessible green roof.” Supervisor: Craig Bachellor
6 Rafael Viñoly Architects | 2021
Above Aerial view of the green roof
7
VALLCO TOWN CENTER The Vallco Town Center site is located on the 50.82-acre Vallco Shopping Mall property in Cupertino, California in the heart of Silicon Valley. Situated between Interstate 280 and Stevens Creek Boulevard and on both sides of North Wolfe Road, the Vallco Mall was once a thriving regional covered mall but has been in continuous decline for more than 30 years and is currently largely vacant. With its convenient proximity to several arterial highways and Main Street Cupertino, the revitalization of Vallco represents a significant change to the urban fabric that is desperately needed for this dynamic and growing community. The core public focus of the Vallco Town Center will be the two plazas, one located
on each side of North Wolfe Road. Each plaza will be a focal point for community events and serve as gathering spaces in support of the surrounding mixed uses. The design divides the town center into 11 building blocks. Block 1, 2, 3, 4, 5, 9, and 10 are comprised of retail, residential, and parking. These 7 residential blocks in total provide 2,402 residential units which are the key focus of this project to provide affordable housing and help alleviate the housing crisis in the Cupertino community. Among the residential blocks, blocks 1, 2, and 4 each houses an anchor retail space along Stevens Creek Boulevard. Block 6, 7, 8, and 11 are comprised of offices,
each including four stories of offices below the green roof and one story of office terrace above the green roof. Flowing over the 11 building blocks will be an approximately 30-acre rooftop landscape that weaves together social and natural systems to create a unique green amenity in Cupertino. Vallco Town center is to be constructed in 3 phases. Phase 1 includes blocks 1, 2, and 4 along Stevens Creek Boulevard. Phase 2 includes blocks 3, 5, 6, and phase 3 includes blocks 7 to 11. By the end of 2020, the team has started Construction Documents for phase 1 blocks.
APPLE PARK
EXISTING VALLCO MALL
EXISTING VALLCO MALL
8 Rafael Viñoly Architects | 2021
Left Aerial Site Map
BLOCK 11
BLOCK 10
BLOCK 9
BLOCK 8
BLOCK 7
BLOCK 6
BLOCK 5
BLOCK 4
BLOCK 3
BLOCK 2
BLOCK 1
N
Street Level Master Plan
East-West Master Plan Section - Block 1, 5, 7, 9 and 11
9
Stevens Creek Boulevard Anchor Stores Elevation Every community aspires to have a physical place that embodies the values of its past and projects the aspirations for its future. Consistent with the City of Cupertino Community Vision 2040 General Plan, the vision for the Vallco Town Center is to revitalize the aging and outdated indoor mall into a vibrant, sustainable, walkable Town Center neighborhood and community gateway with a mix of retail, dining, entertainment, recreation, employment, housing, and open space, all integrated with an innovative and publicly accessible green roof.
10 Rafael Viñoly Architects | 2021
These multi-level spaces animate the Town Center with a line-up of leisure, fashion, technology flagship, and other stores that epitomize the lifestyle of Cupertino. To identify it as a place that celebrates recreational, wellness, and casual activities, town squares punctuate the street grid, providing animated public plazas with subtle references to the region’s agricultural history. The project employs a traditional neighborhood layout that connects the community (internally
and externally) via pedestrian and bike-friendly streets, squares/plazas, trails, and pathways. The circulation space will have a rich texture of paving patterns, lighting, public art, street furniture, and outdoor gathering spaces. The streetscape will incorporate clear wayfinding and access to and from the surrounding streets, plazas, parks, and trails, building green roofs, and parking garages. The majority of the 2,402 residential units will be located at-grade and above ground-floor retail and other active uses, along with a portion that will be in buildings
Images Pedestrian and bike-friendly streets and plazas
Aerial View of Vallco Town Center above the green roof. Private and public open space for the residential units will be provided at both the ground level and via building green roofs.
supporting services. Each of the office buildings has a door that sits atop the green roof with direct access to roof level amenities and activity spaces.
Class-A office space will provide state of the art, efficient, sustainable, and flexible space for a range of users. Office entrances and lobbies will be located at ground level facing the eastern plaza and adjacent streets. Ground floor uses may also include a variety of office amenities, residential townhomes, retail, or commercial
Flowing over the Town Center will be an approximately 30-acre rooftop landscape that weaves together social and natural systems to create a unique green amenity in Cupertino. Recognizing an eternal human need for nature, this elevated landscape provides places for residents and visitors to be immersed in the
representative landscapes of Santa Clara Valley while providing an uninterrupted visual connection to the surrounding mountain ranges of the San Francisco Bay. This rooftop environment will host a diverse set of programmatic uses, including public spaces for community gatherings, a children’s playground, and other intimate spaces for thought and relaxation, using native planting areas that provide habitat for local flora and fauna that will be drought tolerant and climate responsive.
11
PROJECT STRUCTURE AND BIM MANAGEMENT The entire Cupertino team works in Revit for the project and the team makes use of a very detailed and efficient way to manage the models of 11 building blocks, 2 public plazas, a green roof, site, below-grade parking, and foundation. The BIM structure separates the models into two categories, one solely for modeling and one for drawing production. With this, the 20-people team can work in Revit smoothly without clashing with other people. I have worked extensively in all model files and have gained a deep understanding of the entire project and the BIM management process.
linked
Residential Block Containers
linked
Green Roof File
linked
Office Block Containers
Master Site Container File
The master site container file is solely used to produce master plans, sections, and elevations. The file links in all the individual container files, so there is no live model elements in it.
12 Rafael Viñoly Architects | 2021
Individual Block Container Files
Each block container file is solely used to produce building plans, sections, and elevations. Each file links in all the relevant modeling files and hence contains no live model elements.
Residential Enclosure
Residential Structure
loaded as group loaded as group Residential Fit-out Residential Units
Office Enclosure
Office Structure
Office Fit-out
Details
Modeling Files
Detail Files
Modeling files are solely used to model the project and are linked into each block container file. Each building block is divided into three files, one for structure, one for fit-outs, and one for enclosures. This allows maximum flexibility for multiple people to work on the same building.
Detail files are used to produce detail sheets that serve the entire project. The residential unit file contains all the typical unit models and floor plans for the 2,402 units in the project. This file can be loaded into each fit-out file to populate the residential buildings with unit layouts. 13
Green Roof Level Master Plan
DESIGN DEVELOPMENT 100% PACKAGE The team submitted 100% Design Development package on August 31, 2020 During Design Development, there have been many iterations of design updates incorporating perspectives from various stakeholders through many client meetings. The team has gone through an efficient process to update the Revit models and produce clear materials for each client presentation. After a drastic design update in August, the team finished 100% Design Development report for pricing and officially
14 Rafael Viñoly Architects | 2021
started Construction Documents for phase 1 blocks and basement. I have worked extensively on all aspects of the project during the Design Development phase. I have updated models for all 11 blocks, prepared building plans, sections, and elevations. I have also worked on room schedules, area reports, and presentation materials for client meetings.
East-West Master Plan Section
East Master Plan Elevation
Block 9 Level 5 Building Plan
15
Block 9 North-South Building Section
Block 7 Building Section 16 Rafael Viñoly Architects | 2021
Block 9 East Building Elevation
Block 7 Building Elevation 17
6. Tower
5. Terrace Condo
4. MR Corner 2. MR Rental
1. BMR Rental
9. TER Townhouse
7. MR Townhouse
3. MR COH 8. MR Loft
RESIDENTIAL UNITS # % BMR 1201 50% Below-Market Rate Rental MR 508 20% Typical Market Rate Rental Corner Rental Terrace Rental Street Level Townhouse COH 70 Co-Housing Rental
3%
CONDO 623 Below Roof Condo Terrace Condo Tower Condo Tower Penthouse Terrace Townhouse
26%
TOTAL 18 Rafael Viñoly Architects | 2021
2402 100%
1. Below Market Rate Rental BMR Studio and 1 Bedroom Enclosure System - R2 with operable windows
4. Market Rate Rental
2. Market Rate Rental
MR 1 Bedroom Enclosure System - R4A with swing doors
5. Terrace Condominium
Corner 2 Bedroom Enclosure System - R4/R4A with swing doors
Terrace Simplex 1 Bedroom Enclosure System - R5 with sliding doors
7. Market Rate Rental
8. Market Rate Rental
Townhouse 2 Bedroom Enclosure System - R1 with stucco panels and operable windows
Loft 2 Bedroom Enclosure System - R4A with swing doors
3. Market Rate Rental
Co-Housing Flat 5 Bedroom Enclosure System R4 (COH) with operable windows
6. Tower Condominium
Luxury Tower 1 Bedroom Enclosure System - R11 with operable windows
9. Terrace Condominium
Terrace Townhouse Duplex 4 Bedroom Enclosure System - R6 with nana doors and operable windows 19
Block 2 Street Level Life Safety Plan
CONSTRUCTION DOCUMENTS The team is currently working on CD drawings for all blocks and coordinating details with consultants. As the project entered the Construction Documents phase, the team began to develop all blocks in detail and coordinate with consultants on various aspects. Being the person leading residential Blocks 9/10, I started to participate in weekly coordination meetings with structural and MEP consultants. I need to apply the existing solutions developed for other Phase 1 blocks to similar problems in the two Phase 3 blocks. More importantly, I need to
20 Rafael Viñoly Architects | 2021
identify unique conditions in Blocks 9/10 and coordinate with our consultants to resolve them. It has gained me a crucial experience of the interdisciplinary integration process. Apart from working on Blocks 9/10, I also led the production of life safety plans and egress calculations for all residential blocks. I first need to clarify and establish rules for calculations and area measurements. To do so, I prepared draft area plans and tables to discuss with our
code consultant. After several iterations, I set up a clear set of guidelines to follow for our life safety drawings. For our 50% CD progress set issued in October 2021, I led a small team of 3 to finish all life safety drawings of three Phase 1 blocks. The drawings and tables shown on this page are from the progress set mentioned above.
EVELS) LS)
EL) EVEL)
A.02.07.01-B A.02.07.01-B MATCHLINE MATCHLINE
A.04.07.01-A A.04.07.01-A MATCHLINE MATCHLINE
20' - 0" 20' - 0"
W.Gd W.Gd
DOOR DOOR 01.115 01.115 72" 72" Actual Actual # # 26 ppl 26 ppl Capacity Capacity # # 480480 ppl ppl
DOOR DOOR 01.116 01.116 72" 72" Actual Actual # # 41 ppl 41 ppl Capacity Capacity # # 480480 ppl ppl
30' -30' 0" - 0"
30' -30' 0" - 0"
30' -30' 0" - 0"
30' -30' 0" - 0"
77'-8" (DISTANCE BETWEEN 77'-8" EGRESS EXITS, 1/3NCE FLOO (DISTA R DIAGO BETW = 30'-2" EENNAL EGRE ) , SS EXITS 1/3 FLOOR DIAGONAL = 30'-2")
30' - 0" 30' - 0"
CP 24 CP ' - 9 " 2 4' - 9"
RETAIL RETAIL TRASH TRASH RM RM 02-01.305 02-01.305
1' - 2" 1' - 2"
STOR STOR 02-11.104 02-11.104
STAIR STAIR ST.0207 AL AL") ") ST.0207 ONGO40N'-140'-1 UP UP G IA ILA= L = R D RNDA NA OO OOO O FL " DFLIAGDIAG " 3 3 0'- 0'- R R 12 1L2OOLOO RENTAL RENTAL 3F 3F BIKEBIKE STOR STOR (1/ (1/ 02-01.406 02-01.406
74'-3" (DISTANCE BETW74'EE3" N EGRESS EX (DIS1/3 TANFLO CEOR DIAEE BETW GONA = 40'- ITS, SS 1") 1/3 FLOOR DIA N EGLRE EX GONAL = 40'- ITS, 1")
28' - 10" 28' - 10" 2' - 0" 2' - 0" 48' - 0" 48' - 0"
STOR IDF IDF STOR 02-01.304 02-01.304 02-01.302 02-01.302
S, S, EXITEXIT 0" 0" ESSE'-S8S")'-8") 91'- 91N'- EGNREGR 7 7 E EE AL =A5L = 5 E W W N N BETBET GO GO CE CE DIA DIA TANTALNOOLROOR (DIS(D1IS /3 F1/3 F
D
48 OCCUPANTS 48 OCCUPANTS FROM FROM LEVEL LEVEL 03 03
126126 OCCUPANTS OCCUPANTS FROM FROM LEVEL LEVEL B1 B1
(1/3 90'-6 F " (1/3 9L0O'-O6 FLOO FL "RFDL R D OO IA O IA R D OGROND GON IAG AIALG AL ON =O3N AL 0A'-L2 = 3 ") 0'-2 ")
28' - 0" 28' - 0" 2' - 0" 2' - 0" 28' - 10" 28' - 10" 1' - 2" 1' - 2"
TD 155' TD 155' - 1" - 1"
W.La W.La
W.M W.M
126126 OCCUPANTS OCCUPANTS FROM FROM LEVEL LEVEL B1 B1
UP UP
RENTAL RENTAL DOGDOG STOR STOR STOR STOR WASH WASH 02-01.301 02-01.300 02-01.300 02-01.303 02-01.30302-01.301
W.Ka W.Ka
W.LW.L
DOOR DOOR 01.101 01.101 72" 72" Actual Actual # # 187187 ppl ppl Capacity Capacity # # 480480 ppl ppl
25 OCCUPANTS 25 OCCUPANTS FROM FROM LEVEL LEVEL 03 03
RETAIL RETAIL 01 -01 01.116 - 01.116 2,424 2,424 SF SF OF -OF 60- 60 41 41
RETAIL RETAIL 02 -02 01.115 - 01.115 1,511 1,511 SF SF OF -OF 60- 60 26 26
W.Id W.Id
W.K W.K
30' -30' 0" -
UP UP
W.Hd W.Hd
W.JW.J
30' -30' 0" - 0"
90 OCCUPANTS 90 OCCUPANTS FROM FROM LEVEL LEVEL 03 03
C
W.H W.H
W.IW.I
RETAIL RETAIL 02 -02 01.101 - 01.101 11,586 11,586 SF SF OF -OF 60- 60 194194
LOBBY LOBBY RETAIL RETAIL DOOR 01.452 01.452 72" 72" DOOR DOOR 01.117 01.117 72" 72" 02 -02 02 -02 01.450 - 01.450 DOOR 01.117 - 01.117 Actual # # 224224 Actual # # ppl ppl Actual 32 ppl 32 ppl 3,723 1,417 1,417 SF SF Actual 3,723 SF SF Capacity # # 480480 Capacity # # 480480 ppl ppl Capacity ppl ppl OF -OF OF -OF 200- 200 Capacity 60- 60 8 8 63 63 STAIR STAIR ST.0206 ST.0206
30' -30' 0" - 0"
E
UP UP
25 OCCUPANTS 25 OCCUPANTS FROM FROM LEVEL LEVEL 03 03
UP UP
A.02.07.01-B A.02.07.01-B MATCHLINE MATCHLINE
STAIR STAIR ST.0201 ST.0201
W.Ma W.Ma
L ONA DIAG = A57L'-8") LN OOR NG OIAA O 0 " FL '-8") 173'- ORLODOIARGD AL = 57 FL0O" F GON (11/373'- OR DIA F LO (1/3
NCE TANCE
30' -30' 0" - 0"
L NA 2") GO L30'DIA AOLN=A 0'-2") OR IA ONG = 3 FLO DRIADG NAL 6" O 90'- "OFOLRO IAGO L D 0'-F6 R (19/3 LOO F (1/3
CBC 1020.4, 1020.4, E04.1.1), 1004.1.1), FIREFIREABLE C TABLE 601601 & & THE TH THE
28' -28' 0" - 0"
, XITS " SS E , 83'-4 EGRE 30'-E2X")ITS E4E"N LE=SS ET8W3'- GNOENGAR 30'-2") CE B RW DEIAE NAL = TAN OT (DIS /3NCFELOBE DIAGO T1A OR (DIS /3 FLO 1
PER ED PER CODE. CODE.
C.I.P. . CONCRETE CONCRETE
2' - 0" 2' - 0"
DOOR DOOR 01.103 01.103 72" 72" Actual Actual # # 55 ppl 55 ppl Capacity Capacity # # 480480 ppl ppl MATCHLINE MATCHLINE A.01.07.01-A A.01.07.01-A
RETAIL RETAIL 02 -02 01.103 - 01.103 6,512 6,512 SF SF OF -OF 60- 60 109109
LOBBY LOBBY 02 -02 01.400 - 01.400 DOOR DOOR 01.453 01.453 72" 72" Actual # # 224224 ppl ppl 3,215 3,215 SF SF Actual OF -OF 200- 200 Capacity Capacity # # 480480 ppl ppl 17 17
90 OCCUPANTS 90 OCCUPANTS FROM FROM LEVEL LEVEL 03 03 RETAIL RETAIL 02 -02 01.102 - 01.102 3,723 3,723 SF SF OF -OF 60- 60 F 63 63
DOOR DOOR 01.102 01.102 72" 72" Actual Actual # # 32 ppl 32 ppl Capacity Capacity # # 480480 ppl ppl
GENERAL NOTES 1. 2. 3.
LEVEL LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 01 (BL02) LEVEL 03 (BL02) TOTAL
FIRE-RESISTANCE RATINGS SHOWN ARE THE MIN. REQUIRED PER CODE. ACTUAL RATING PROVIDED MAY EXCEED THIS VALUE. SEE 2016 CBC TABLE 721.2.1.1 FOR FIRE-RESISTANCE OF C.I.P. CONCRETE WALLS. SEE DWG A.00.03.07 FOR TRAVEL DISTANCE LIMITS (2016 CBC 1020.4, 1006.2.1, 1017.2), OCCUPANCY LOAD FACTORS (2016 TABLE 1004.1.1), FIRERESISTANCE RATINGS FOR BUILDING ELEMENTS (2016 CBC TABLE 601 & 602), AND OTHER LIFE SAFETY INFORMATION RELATED WITH THE PROJECT.
G
BLOCK BLOCK 2 - LEVEL 2 - LEVEL 01 OCCUPANT 01 OCCUPANT CALCULATIONS CALCULATIONS
LEVEL LEVEL ROOM ROOM NO.NO. NAME NAME LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.101 02-01.101 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.102 02-01.102 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.103 02-01.103 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.104 02-01.104 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.105 02-01.105 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.106 02-01.106 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.107 02-01.107 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.108 02-01.108 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.109 02-01.109 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.110 02-01.110 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.111 02-01.111 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.112 02-01.112 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.113 02-01.113 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.114 02-01.114 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.115 02-01.115 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)01-01.116 01-01.116 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.117 02-01.117 RETAIL RETAIL LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.306 02-01.306 - 01.309 - 01.309 MEPMEP LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.308 02-01.308 LOADING LOADING DOCK DOCK LEVEL LEVEL 01 (BL02) 01 (BL02)02-01.310 02-01.310 MEPMEP LEVEL 01 (BL02) LOBBY LEVEL 01 (BL02)02-01.400 02-01.400 LOBBY LEVEL 01 (BL02) LOBBY LEVEL 01 (BL02)02-01.410 02-01.410 LOBBY LEVEL 01 (BL02) LOBBY LEVEL 01 (BL02)02-01.420 02-01.420 LOBBY LEVEL 01 (BL02) LOBBY LEVEL 01 (BL02)02-01.430 02-01.430 LOBBY LEVEL 01 (BL02) LOBBY LEVEL 01 (BL02)02-01.440 02-01.440 LOBBY LEVEL 01 (BL02) LOBBY LEVEL 01 (BL02)02-01.450 02-01.450 LOBBY LEVEL 01 (BL02) LOBBY LEVEL 01 (BL02)02-01.521 02-01.521 LOBBY LEVEL 01 (BL02) LOBBY LEVEL 01 (BL02)02-01.541 02-01.541 LOBBY LEVEL 03 (BL02) RETAIL LEVEL 03 (BL02)02-03.101 02-03.101 RETAIL TOTAL TOTAL
OCCUPANCY OCCUPANCY FACTOR FACTOR USEUSE (SF/PER) (SF/PER) MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF MERCANTILE MERCANTILE 60 SF 60 SF STORAGE/MEP STORAGE/MEP 300300 SF SF STORAGE/MEP STORAGE/MEP 300300 SF SF STORAGE/MEP STORAGE/MEP 300300 SF SF RESIDENTIAL SF SF RESIDENTIAL 200200 RESIDENTIAL SF SF RESIDENTIAL 200200 RESIDENTIAL SF SF RESIDENTIAL 200200 RESIDENTIAL SF SF RESIDENTIAL 200200 RESIDENTIAL SF SF RESIDENTIAL 200200 RESIDENTIAL SF SF RESIDENTIAL 200200 RESIDENTIAL SF SF RESIDENTIAL 200200 RESIDENTIAL SF SF RESIDENTIAL 200200 MERCANTILE 60 SF MERCANTILE 60 SF
LIFE SAFETY LEGEND
BLOCK BLOCK 2 - LEVEL 2 - LEVEL 01 EGRESS 01 EGRESS ANALYSIS ANALYSIS OCCUPANCY OCCUPANCY LOAD LOAD AREA AREA 11,586 11,586 SF SF 194194 3,723 3,723 SF SF 63 63 6,512 6,512 SF SF 109109 1,203 1,203 SF SF 21 21 2,424 2,424 SF SF 41 41 1,418 1,418 SF SF 24 24 2,956 2,956 SF SF 50 50 4,474 4,474 SF SF 75 75 3,758 3,758 SF SF 63 63 2,424 2,424 SF SF 41 41 4,533 4,533 SF SF 76 76 1,511 1,511 SF SF 26 26 1,488 1,488 SF SF 25 25 1,526 1,526 SF SF 26 26 1,511 1,511 SF SF 26 26 2,424 2,424 SF SF 41 41 3,723 3,723 SF SF 63 63 5,053 5,053 SF SF 17 17 1,496 1,496 SF SF 5 5 4 4 1,140 1,140 SF SF 3,215 SF SF 17 17 3,215 360360 SF SF 2 2 1,779 SF SF 9 9 1,779 1,428 SF SF 8 8 1,428 2,402 SF SF 13 13 2,402 1,417 SF SF 8 8 1,417 2,242 SF SF 12 12 2,242 2,467 SF SF 13 13 2,467 10,704 SF SF 179179 10,704 90,895 SF SF 12511251 90,895
EGRESS EGRESS DOOR DOOR WIDTH WIDTH STAIR STAIR PROVIDED PROVIDED CAPACITY CAPACITY REQUIRED REQUIRED CAPACITY CAPACITY COMPONENT COMPONENT (IN)(IN) WIDTH WIDTH (IN)(IN) (PERSONS) (PERSONS) (PERSONS) (PERSONS) 01.101 01.101 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 187187 01.102 01.102 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 32 32 01.103 01.103 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 55 55 01.104 01.104 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 21 21 01.105 01.105 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 41 41 01.106 01.106 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 24 24 01.107 01.107 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 25 25 01.108 01.108 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 38 38 01.109 01.109 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 32 32 01.110 01.110 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 41 41 01.111 01.111 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 38 38 01.112 01.112 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 26 26 01.113 01.113 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 25 25 01.114 01.114 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 26 26 01.115 01.115 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 26 26 01.116 01.116 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 41 41 01.117 01.117 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 32 32 01.204 01.204 36 36 N/AN/A 36" 36" / .15/ =.15240 = 240 224224 01.411 01.411 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 224224 01.412 01.412 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 224224 01.432 01.432 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 224224 01.452 01.452 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 224224 01.453 01.453 72 72 N/AN/A 72" 72" / .15/ =.15480 = 480 224224 10800 TOTAL TOTAL 10800 20452045
H
CP XX' - XX"
COMMON PATH OF EGRESS TRAVEL DISTANCE EGRESS TRAVEL DISTANCE 3 HR FIRE RATED BARRIER 2 HR FIRE RATED BARRIER 1 HR FIRE RATED BARRIER
DE XX' - XX"
DEAD END DISTANCE FLOOR DIAGONAL DISTANCE BETWEEN EGRESS EXITS EXIT DIRECTION (DOWN FROM UPPER LEVELS) EXIT DIRECTION (UP FROM BASEMENT LEVEL)
Block 2 Street Level Occupant Calculations and Egress Analysis
21
RAFAEL VINOLY ARCHITECTS PC
AREA SUMMARY - SB 35 COMPLIANCE 3.1 Area Summary One important aspect of the Vallco Town Center project is its compliance with Area California Senate Bill 35 requirements. To be Current Project Summary compliant, At least 2/3 of the proposed development’s square footage must be designated for residential. For this purpose, the team has closely monitored the areas of the project as the design evolved. Also, to help the client to meet their pro forma financial goals, the team has prepared detailed area reports along the way. I have been in charge of preparing area plans and helped to monitor the project areas in Revit.
Vallco Town Center Project - Design Brief and Area Summary DD37 SCHEME 1 DATE: 08/31/20 USE PUBLIC OPEN SPACE
Public Town Square East Public Town Square West
PRIVATE OPEN SPACE
Private Residential Balconies
Green Roof Space Block Break Down Private Residential Terraces Private Residential Sloped Roof Private Residential Mechanical Roof Private Office Balconies Private Office Terraces Private Office Maintenance Roof Private Office Mechanical Roof TOTAL PRIVATE OPEN SPACE (SF / ACRES)
SITE PLAN
Landscape Hardscape Site Plan (Streets, Sidewalks, Landscape) Buildings Footprint Floors (#) Total Floors Above Grade Total Basement Floors Below Grade TOTAL SITE PLAN AREA (SF / ACRES)
BELOW GRADE PARKING
Area (sf)
Below Grade Level 1 Below Grade Level 2
TOTAL BELOW GRADE PARKING AREA (SF) TOTAL BELOW GRADE PARKING STALLS
Street Parking Stalls ABOVE GRADE PUBLIC PARKING TOTAL STREET PARKING STALLS TOTAL PROJECT PARKING STALLS / LOADING / Loading Bay Street Loading BIKE STALLS Loading Bay Loading Bay
ABOVE GRADE PARKING (RESIDENTIAL)
Above Grade Below Grade
Bike Parking I Bike Parking II
Indoor. Resi + Office Outdoor. Resi + Retail
Stalls(#)
Above Grade Stalls (Residential)
Above Grade Stalls (Retail, Visitor) Area (sf) Above Grade Parking Area (SF) TOTAL ABOVE GRADE RESIDENTIAL PARKING AREA (SF)* TOTAL ABOVE GRADE TOTAL PARKING STALLS
RESIDENTIAL
Unit Gross Area (sf)
-Tower Units Area -Terrace Units Area -Terrace Rental Units Area -Loft Units Area -Co-Housing Units Area -Below Roof Condo Units Area -Traditional Units Area
-Town House Area -BMR Units Area TOTAL RESIDENTIAL RENTABLE UNIT AREA (SF) Core Corridor Lobbies MEP, Trash, Loading, BOH on Grade MEP on Upper Mechenical Floor Pool MEP Amenities Amenities - SHPCO Offices Amenities % TOTAL RESIDENTIAL GROSS UNIT AREA W/O Amenity(SF) TOTAL RESIDENTIAL GROSS UNIT AREA (SF)
RESIDENTIAL + RESIDENTIAL PARKING
TOTAL RESIDENTIAL USE SPACE (SF)
OFFICE
Area (sf)
DOUBLE HEIGHT AREA (SF) CITY LETTER ALLOWED RESIDENTIAL AREA (SF) % Office Net Floor Area Office Core Office Services at grade Office Amenities Above Roof Balconies and Terraces (Shown in "Open Space“) Mechanical TOTAL OFFICE GROSS AREA (SF) DOUBLE HEIGHT AREA (SF) CITY LETTER ALLOWED OFFICE AREA (SF)
Area (sf) RETAIL & ENTERTAINMENT
-Retail Net Area -Circulation and Support (Counted towards RESI) Retail Area (Net Only) Retail Area (West+East Plaza) - excludes in total RetaiI Area (REI) Entertainment AMC Theater Entertainment Bowl Mor Entertainment Ice Rink TOTAL ENTERTAINMENT AREA (SF) TOTAL RETAIL AREA (SF)
PLAZA AREA TOTAL RETAIL + ENTERTAINMENT AREA (SF) DOUBLE HEIGHT AREA (SF) CITY LETTER ALLOWED RETAIL AREA
RETAIL & OFFICES
Total Area (sf) Total Area with Double Height Space (sf) %
CENTRAL PLANT / TRASH TERMINAL / FIRE STATION (NOT INCL. IN TOTAL) TOTAL (ABOVE GRADE, EXCL. STRUCTURE PARKING) TOTAL (ABOVE GRADE, INCL. STRUCTURE PARKING) DOUBLE HEIGHT/POTENTIAL MEZZANINE SPACE TOTAL (ABOVE GRADE, INCL. STRUCTURE PARKING AND DOUBLE HEIGHT AREA) TOTAL (INCL. B.PARKING) UNDERGROUND PARKING AREA
22 Rafael Viñoly Architects | 2021
Right Overall Project Area Report
TOTAL (INCL. B PARKING, SITEWORK, GREEN ROOF ) TOTAL (INCL. B PARKING, SITEWORK, GREEN ROOF, TERRACES, BUILDING ROOF )
Page 135
PROGRAM
RVA PROVIDED
Delta
(Gross) SF
(Gross) ACRES/SF
Δ
2.03
88,555
1.20 17.67
52,258 769,578
Block 1
Block 2
West of Wolfe Rd.
East of Wolfe Rd.
33.20 Acres
17.62 Acres
Block 3
Block 4
Block 5
Block 6
Block 7
Block 8
Block 9
Block 10
Block 11
35,148.00
35,148.00
106,396.00
2.03 -
1.20 10.56
7.11
769,578
171,972.00
54,479.00
69,565.00
61,797.00
46,766.00
6.59
286,866
51,645
32,756
50,666
44,517
32,360
37,461
37,461
3.14
136,963
19,484
26,845
44,049
4,464
12,375
14,873
14,873
2.91
126,774
54,316
49,225
23,233
10,890
17,091
5,697
5,697
0.90
39,375
2.32
100,852
0.39
16,826
3.26 2.98 22.49 10.15 14.86 25.01
442,106 647,355 1,089,461
25.81
1,124,353
25.01
55,493.00
65,567.00
67,247.00
18,427
18,427
18,427
45,571
142,177
28,272
28,272
28,272
57,361
129,625 979,458
26,271 72,970
26,271 72,970
58,031
50,812 170,570
98,206
67,968
144,169
116,593
67,967
63,648
63,647
63,647
56,741
55,728
136,656
20
10
10
6
6
6
22
8
125,445
70,491
111,806
256,422
99,135
8
19
58,031
698,490
390,971
2 1,089,461
1 698,490
22 2 390,971
1,739,239
1,112,774
626,465
1,112,774
1,252,930
626,465
2,365,704
2,263
5,515 116 116 8,407
20
23
5 2 4 48
2 1 6 256
15 84
3,252 12
7
7
12
9
3 1 3 152
2 1 2 106
2 1
1 1
1 1
268
268
268
32
444 Stall/SF 6
5
0
1 1 3 256
1 1 4 256
3 2
(2,093)
22 14 31
1 2 9 382
3,044 306
10
30
80
40
30
66
50
2,646
201
272
625
436
306
403
403
130 1,395,086 1,395,086 2,776
127 147,007
182,793
161,770
164,704 329,420
164,716
514,902 626,162
166,357
47,213 91,040
3 353,417 220,679 1,065,666 1,840
152,515
225,973
80,886
134,081
16,335
10,980
124,532
806
131,848 47,213 33,335
502 Stall/SF
68,207
68,207
56,595
56,395
15,195
15,195
43,194 20,057
43,859
74,736
75,803 22,495
19,122
209,551
88,418 358,211
182,067 640,373
63,822 320,202
36,436 191,720
90,535 328,830
90,533 325,255
24,407 36,568
57,017 30,096
81,328 56,214
40,232 43,092
23,352 32,536
41,572 31,835
41,572 32,027
68,013 134,293
4,919 18,709
12,331 14,809
17,554 34,349
12,962 13,016
2,770 13,976
9,075 17,695
8,402 21,739
85,030
43,413
551,811 2,374,142 309,480 262,368
0
0
0
75,803
98,275
34,146
10,505
16,841
15,268
10,327
5,594
5,594
5,864 107,709
2,932 9,155
23,617
31,148
2,932 13,885
11,046
10,209
8,649
26,449
26,449
3.2% 3,252,435
2.5% 331,232 366,836
4.7% 482,969 506,586
3.9% 274,681 285,727
2.3% 434,601 444,810 888,048
2.0% 434,589 443,238 607,954
3,386,593
3.5% 3.0% 846,659 447,704 877,807 461,589 2,498,545
0 0
0 0
0 0
4,700,000
4,781,679
513,843
689,379
1,231,224
682,268
447,497
609,514
261,904
215,303
8,930
16,632
28,799
54,943
32,252
36,217
37,530
4,961,904
4,996,982
522,773
706,011
1,260,023
737,211
479,749
645,731
645,484
1,810,000 171,447 1,981,447
67.30%
784
124,532
43,194 290,258
66.70%
*Bridge area is included in block 5
16,826 26,271 72,970
626,465
10,500
Note
0
0 0
0.60%
1,695,817
270,163
271,952
271,952
881,750
145,457 115,999
24,383 21,754
24,383 21,681
24,383 21,681
72,308 50,883
0 117,678
18,427
18,427
18,427
62,397
24,174 1,981,447
3,559 319,859
4,044 322,060
4,044 322,060
12,527 1,017,468
319,859
322,060
322,060
1,017,468
1,981,447 336,991 40,953 377,944 1,595
146,405 21,352 167,757
69,456 6,002 75,458
14,677 923 15,600
69,953 7,240 77,193
36,500 5,436 41,936
41,038 167,757
75,458
15,600
77,193
41,936
208,795 23,988 232,783
1,595 75,458 1,035 78,088
15,600
41,936
15,600
77,193 1,072 78,265
41,936
5,788,617
575,631
583,639
893,407
538,782
327,663
319,859
322,060
322,060
444,810
443,238
1,017,468 *Total Area Includes Residential, Office and Retail Total
7,183,703
722,638
766,432
1,246,824
759,461
489,433
319,859
322,060
322,060
609,514
607,954
1,017,468
7,425,101
755,556
784,099
1,275,623
815,476
521,685
319,859
322,060
322,060
645,731
645,484
1,017,468 7,425,101
9,549,407
1,104,142
913,925
1,461,318
932,928
590,554
414,554
416,754
416,754
693,933
690,866
1,220,784
2,365,704
381,504
147,493
214,494
173,467
101,121
94,695
211,852
211,852
188,865
185,494
454,867
50,000 41,038
120,000 280,000
41,038 377,944
400,000 85,912 485,912
1,595 420,577 26,095 446,672
*Zoning Allows Max. 30% Entertainment Area within Retail Area
2,402,024 2,428,119 32.70% 42,363
241,398
-
-
11,408,446
-
12,387,904
23
Professional
2 Saddleback College ATAS Building HGA Los Angeles | 2018 Summer Professional Competition Supervisors: Matthew Austin John Frane Kaveh Amirdelfan
24 HGA Los Angeles | 2018
Right 1/16” Presentation Model
25
SADDLEBACK COLLEGE ATAS BUILDING A new Advanced Technology and Applied Science Building connecting the existing campus to nature.
Extending the Campus The proposed ATAS extends the established campus framework. The three-spoke form unifies the building program and allows campus circulation to flow toward the arroyo or converge into the heart of the new ATAS. Extending from the new shared ATAS central courtyard, the building form directs movement and views eastward to the arroyo and vistas beyond. A natural pathway, the Arroyo Axis, winds along the southern edge, transitioning from programmed terrace spaces to the sports fields to the south. The proposed design connects the new ATAS with the established campus with an open amphitheater which gently slopes towards to the central courtyard. This also mitigates the drastic change in elevation from the existing campus and the new ATAS site and creates a planted barrier from the public road. At the same time, the amphitheater provides an open outdoor area for gatherings and activities and connects with the natural pathway to the Arroyo Canyon at the south. Conceptual model of the three-spoke form
Campus
26 HGA Los Angeles | 2018
ATAS Building
Arroyo Canyon
1/16” presentation model with customized trees
DESIGN
NATURE TECHNOLOGY
Central Forum
A single hub for multiple disciplines
Cool and Connected
Passive design for active spaces
Inviting Canopy
Intertwining community and sustainability
27
Upper Street plaza designs for the new off-campus tennis courts construction. Lower Central courtyard designed to provide gathering spaces for the students.
28 HGA Los Angeles | 2018
Images Storytelling renderings done with Enscape
Upper Level 2 exterior catwalk featuring outdoor gathering space shaded by the continuous canopy. Lower Arroyo Axis providing hands-on experiences for students in the Nature department.
29
Academic
3 MEGA-Block REDUX PennDesign M.Arch I 2017 Fall Individual Work “An urban densification study for Stuyvesant Town, New York. The collective studio renders transformation for the entire housing complex trying to relieve the housing pressure of the city. The studio starts with designing a character and a narrative for her.” Critic: Kutan Ayata
30 PennDesign | Fall 2017
Above Collective Site Plan
31
STUYVESANT TOWN | 2037 The evolution of a WeWork/WeLive housing model from 2017 to 2037 through the eyes of Anita Miller. “Back in 2017, the country was a restless place filled with young people eager to make their marks in the world. It was a time when the number of start-up companies tripled in three years. And I was one of them. I was striving to become a blogger and to start my own workshop. So, I moved to Stuyvesant Town where an entire building had just been implemented for the WeWork/WeLive structure providing great resources for young businesses.
32 PennDesign | Fall 2017
In 2033, as the big businesses kept expanding and began to colonize every segment of the economic world, start-up companies had fewer and fewer space left to survive. As their companies failed, people also started to move out of Stuyvesant Town. It was a slow and gradual process, but it eventually happened. In 2033, the bubble of the startup dream popped. So did the balloons at Stuyvesant Town. I was there. After 8 years, I also closed my blogging workshop in 2032.
Now in 2037, I have worked as an editor at an online magazine for 4 years. And the building rebuilt the balloons early this year but this time, made it into Day Care Service areas to serve its new residents - people living with their extended families. It becomes such a different space but it looks just like the way I remember it...”
Left The massing development documents in 2017
The Stuy Town in 2033 The image is a Polaroid took by Anita in 2033 after the balloon membranes of the work-from-home area were demolished. “So the balloons here eventually popped in 2033 when more and more start-up teams ended up failing and moved out of the building.” 33
COMMUNITY PROGRAM The community space is a two-story area enclosed by translucent balloon membranes. The open space is closely connected to the building mass with continuous floor planes. In 2017, the open area was used as a Work-from-Home space and the connected rooms within the building were conference rooms for rental. In 2037, the open area is reconstructed as a playground for kids and the conference rooms are used as activity rooms with various infrastructure installed.
1. 2. 3. 4. 5.
Connected Double-Height Rooms Apartments Above Community Space Viewing/Lounging Deck Apartments Below
2. 1. 4.
1.
3.
5.
2.
1.
1.
1.
4.
Programs in 2017
3.
1. 2. 3. 4. 5.
5.
1.
Duplex Apartments Communal Space Rental Conference Rooms Work-from-Home Space Viewing/Lounging Spot
1.
1. 2.
4.
3.
Programs in 2037
5.
1. 2. 3. 4. 5.
Duplex Apartments Communal Space Activity Rooms Open Playground for Kids Viewing/Lounging Spot
35
UNIT DEVELOPMENT In 2017, all housing units are redevelopment into dorm-like apartments with multiple bedrooms for targeting start-up teams. In 2037, the dorm-like units are kept, only now are occupied by large families or families living with their extended families relieving the housing pressure in New York City.
Unit Floor Plan
Unit Floor Plan
36 PennDesign | Fall 2017
Level 19
Level 14
Level 9 37
38 PennDesign | Fall 2017
Left A street view at night back in 2017 when many startups teams were working in the community space
Above The street view of the building after reconstruction in 2037. The balloon structures have been restored and are ready to be occupied once more.
Above Anita Miller walking in the Stuy Town in 2037 after our interview with her.
Above A drone shot of the balloon structures and membranes back in 2017. Apertures are designed with views towards the street.
Above A shot within Anita’s apartment in 2037. She can see the reconstructed balloon structures right from her apartment window.
39
40 PennDesign | Fall 2017
Above Looking up at the reconstructed community space
41
42 PennDesign | Fall 2017
Images Studio Collective Model
43
Academic
4 The Oasis EWR Landside Terminal PennDesign M.Arch I 2019 Spring Pair Work with Yitian Zheng “The semester-long architecture and planning studio collaborated to address an opportunity to design and develop a new landside terminal for Newark Liberty International Airport as a means to reactivate the underutilized areas around the airport and to bring new economic opportunities to the City of Newark and its residents.” Critic: Marilyn Taylor
44 PennDesign | Spring 2019
Above Perspective | Arriving Train
45
EQUITY TRIANGLE The studio developed the Equity Triangle, a conceptual framework to convey the economic and spatial relationships between the South Ward and Newark’s principal employment areas. The major nodes in the equity triangle include the residential Weequahic neighborhood, which is representative of the South Ward based on its high poverty rate and long average commute times, the Newark Liberty International Airport, and Newark’s downtown Central Business District (CBD). Linking all three of the major employment nodes is Frelinghuysen Avenue and the intercity railway, the Northeast Corridor.
Establishing connection 46 PennDesign | Spring 2019
Frelinghuysen today is an oversized roadway that serves as a route for large trucks to distribute goods. It is poorly served by local transit and is lacking any significant commercial development. Repositioning Frelinghuysen Avenue as a human-scale, economic spine that connects all major employment areas could greatly benefit Newark as a job generator and an extension of the CBD.
THE OASIS One key driving force of the form-finding process for the landside terminal is to create connections between the Weequahic neighborhood through the redesigned Frelinghuysen Avenue and the airside
Form flowing from the core
concourses. This connection pathway is further developed to incorporate a central landscaped oasis within the terminal. As the anchor point of the new airport city, the Oasis landside terminal tries to provide an unprecedented airport experience as it integrates the access road system within the architecture itself allowing everyone to experience the different programs inside while driving around. Unlike many current airport designs, the Oasis focuses on the arrival experiences. As people arrive at the airport, they are exposed to a variety of services and entertainment programs right within the building and can start experiencing the new airport city and local Newark as they step outside the baggage claim.
Further programming
Departure Road System on the Second Level
Arrival Road System on the Ground Level 47
SHOPS
CHECK IN
FAST TRACK BAGGAGE DROP
TRAIN CONCOURSE 2.
AIR TRAIN
SECURITY
ELEVATOR DOWN TO AIR TRAIN 3.
4. DROP-OFF CURB
AIR TRAIN TO MID FIELD CONCOURSE
1. ELEVATOR UP TO TRAIN CONCOURSE
GROUND TRANSPORTATION CENTER
Departure Circulation Flow 1. Arrive via driving oneself, rental
cars or bus
2. Arrive via trains 3. Arrive via air trains from other
destinations within the airport city
4. Being dropped by others driving
48 PennDesign | Spring 2019
TRAIN CONCOURSE 2.
AIR TRAIN
AIR 3. TRAIN
AIR TRAIN FROM MID FIELD CONCOURSE
1.
GROUND TRANSPORTATION CENTER
ELEVATOR UP TO AIR TRAIN 4. PICK-UP CURB IMMIGRATION/ BAGGAGE CLAIM
Arrival Circulation Flow 1. Leave via parked or rental cars
or bus
2. Being picked up by others 3. Leave via air trains to other
destinations in the airport city
4. Leave via trains
49
2 1
3
7
6
1. 2. 3. 4. 5. 6. 7.
Train Concourse Greeter Hall Aviation Museum International Arrival Domestic Arrival Airport Offices Oasis
50 PennDesign | Spring 2019
4
5
Level 1 - Arrival, Drop-off, Aviation Museum
Above Longitudinal Perspective Section
2
1
4
7 3
6
1. 2. 3. 4. 5. 6. 7. 8.
Train Concourse Shopping Mall Movie Theater Casino Support Space Airport Offices Oasis Air Train
5
8
Level 2 - Train Concourse, Pick-up, Air Train Station
51
Airport Staff Offices
52 PennDesign | Spring 2019
Baggage Drop and Baggage Sorting
Above Transverse Perspective Section
Shopping Mall and Arrival Pick-up
Shopping Mall and Greeter Hall
53
Upper Aviation museum on the ground level outside the greeter hall, also visible from upper levels. Lower Pick-up lanes at arrival around the central oasis providing views to the landscape within.
54 PennDesign | Spring 2019
Images Photo realistic renderings done with Vray
Upper City entrance from Weequahic park with bus stations, bike lanes and direct access to the train concourse. Lower Departure hall providing check-in kiosks and three options of routes: shopping, the fast track and baggage drop-offs.
55
2020s 100-year Floodplain 2020s 500-year Floodplain 2050s 100-year Floodplain Parks
Academic
5 Food, Farm, Flushing PennDesign M.Arch I 2018 Fall Pair Work with Zhengyang Zhu “The Highway Resilience studio led by Matthijs Bouw focuses on the resilience strategies targeting flooding issues in New York. After Hurricane Sandy, New York is actively looking into the resilience of the city. After studying the situation around Flushing Creek, we proposed a new waterfront food hub for the area.” Critic: Matthijs Bouw
56 PennDesign | Fall 2018
Right Flushing Creek Flood Map
FLUSHING CREEK
57
HIGHWAY INTERVENTION After thoroughly studying the flood risk of the area, the team proposed a series of strategies to protect the area for future development opportunities.
FLUSHING CREEK
FLUSHING
CORONA
Flood Risk
Highway Intervention
2020s 100-year Floodplain
Highway Reroute
2020s 500-year Floodplain
Elevated Park
2050s 100-year Floodplain
Dam
Parks
58 PennDesign | Fall 2018
FLUSHING CREEK
FLUSHING
CORONA
Development Opportunity Widening Flushing Creek Willets Point Development Flushing Food Hub New Ferry Route
59
CONNECTIONS TO DOWNTOWN FLUSHING Establishing connections from Downtown Flushing to waterfront by using existing parking lots as stepping stones.
Existing Infrastructure Park ParkSpace Space Parking Parking Recovery & Resiliency ProjectProject Recovery & Resiliency Open Space Open Space Green Infrastructure Green Infrastructure
60 PennDesign | Fall 2018
5.
3.
2.
5.
1.
4.
5. 5. 5.
3.
Master Site Plan 1. 2. 3. 4. 5.
Flushing Food Hub Water Plaza Waterfront Park Street Plaza Stepping Stones
61
Stepp
New Development College Point Street Plaza Northern Blvd
Vertical Farmin
Food Ferry
Food Storage + Processing
Elevated Park Water Plaza
W
Flushing Creek
Willets Point Development Van Wyck Expy
62 PennDesign | Fall 2018
Above Comprehensive Axon
Main St Station
ping Stone Stepping Stone Stepping Stone
Stepping Stone Stepping Stone
ng
Stepping Stone
New Development
Waterfront Park
Line 7 Metro
63
BUILDING DEVELOPMENT 8.
A food destination in a new waterfront park. Three separate building masses are united by one continuous accessible green roof providing accessibility for people coming from the park as well as the city.
7.
1.
6. 2. 3.
9. 10.
5. 4.
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.
Ferry Terminal Food Processing and Storage AV Parking Dining Waterfront Park and Pedestrian Path Food Market Accessible Green Roof Vertical Farming Flushing Creek Water Plaza Waterfront Park
11.
PV panels
Food Processing Food Storage AV parking
Water Plaza
3. Food Processing and AV Parking
Waterfront Path
Raised Ground Floor Gray Water Tank Black Water Tank Water Plaza
4. Dining
Aeroponics Plantation Vertical Harvest Farming Scaffold
Aquaponics System Education Center
8. Vertical Farming
65
Left Entrance at the elevated bridge from waterfront park
67
68 USC SoA | Spring 2017
6. MATERIAL ASSEMBLAGE Material assemblage design for Cardiff Bay Opera House designed by Zaha Hadid
A B C D E F G H I J
tapered roof drainage gravel 2” topping concrete slab, sloped at 1% 4” wide aluminum gutter waterproof 1/4” laminated glass, two lites 2” (+/-) aluminum horizontal mullion with infill to consolidate glass panels 1/16” Butyl roof membrane 2”x4” aluminum horizontal mullion 5”x10” steel tube for mullion connection steel end C-channel
K L M N O P Q R S T
CPJ weld for moment frame 2”x4” extruded aluminum vertical mullion 2” thick composite board rigid insulation 1/4” laminated spandrel glass, two lites continuity plate 1”x2” wood sill 2”x10” steel tube for mullion connection 2 layer 5/8” type X gypsum board ceiling W14 primary steel column shear tab
69
Miscellaneous
7 “likes“ Integrated Product Design | 2019 Spring “The project is an exhibition piece that tries to exemplify the relationships between people in this digital age. The project integrated the use of Particle Argon, data processing, and product designs to visualize digital and actual human interactions. The project is featured on the UPenn IPD portfolio page.”
70 PennDesign | Spring 2019
Right “Alone, Together“ Exhibition Poster
71
“likes” Likes on social media have become a measure of acceptance and fulfillment in our modern world today. Differentiating between the physical and the digital, ‘likes’ draws the line between human recognition via two very different media. The classic ‘Instagram’ heart (left) fills with love
72 PennDesign | Spring 2019
for every ‘like’ on a picture of this very exhibition via social media in real time. It’s counterpart, resembling a physical heart (right), beats with an intensity which mimics the level of engagement of the guests within this room right now, including you, standing here, reading this, at this very moment.
Images “Along, Together“ Exhibition Photos
73
yzheng2019@gmail.com 415.463.9609