ARCHITECTURE, LLC
SF Fog Por[t]ch SHEET:
A 0.0
A 1.1.1 A 1.1.2 A 1.1.3 A 1.1.4 A 1.1.5 A 1.1.6 A 1.1.7 A 1.1.8 A 1.2.1 A 1.2.2 A 1.2.3 A 1.2.4 A 1.2.5 A 1.2.6 A 1.2.7 A 1.3.1 A 1.3.2
Ferry Building Timeline Geologic Section Cut SF Contour Map SF Noise Map SF Circulation Modes SF Site Conditions Ferry Market Circulations SF Ferry Boat Map SF Annual Weather Diagram SF Annual Wind Diagrams SF Tidal Flow Diagram SF Sunlight Study Diagram SF Fog Diagram Site Views Diagram Sunrise/Sunset Analysis Diagram Molinete Ruins Precedent Study Precedent Study
M 5.1
Passive Building Energy Diagram
S 4.0 S 4.1.1 S 4.1.2 S 4.1.3 S 4.2.1 S 4.2.2 S 4.2.3 S 4.2.4
SE Perspective Render Upper Belvedere Render W Section Render Site Plan Level 01 Floor Plan Level 02 Floor Plan Level 03 Floor Plan Section A-A Section B-B Section C-C Project Final Model
STRUCTURAL SYSTEMS Wall Section: Lounge Wall Section: Bike Kitchen Overall Wall Sections and Structural Piers Roof Structure Exploded Axo Roof Structural Details Roof Structural Details ETFE Assembly Diagram
Initial Conceptual Sketches / Models Concept: Site Plan / Sections Concept Model 01 Spatial Program / Circulation Diagram Structural / Material / Energy Reivew 01 Visibility Studies / Site Analysis / Roof Diagramming Structural / Material / Energy Review 02 Roof Plan Conceptual Development Mid-term Review Model and Renders Mid-term Review Model and Renders Mid-term Review Model and Renders Structural / Material / Energy Review 03 Structural / Material / Energy Review 03 Structural / Material / Energy Review 03 Structural / Material / Energy Review 03
FINAL
LOCATION: San Francisco, CA
A 3.1.1 A 3.1.2 A 3.1.3 A 3.2 A 3.3.1 A 3.3.2 A 3.3.3 A 3.4.1 A 3.4.2 A 3.4.3 A 3.5.1
ARCHITECTURE
A 7.1.1 A 7.1.2 A 7.1.3 A 7.1.4 A 7.1.5 A 7.1.6 A 7.1.7 A 7.1.8 A 7.2.1 A 7.2.1 A 7.2.1 A 7.2.1 A 7.2.1 A 7.2.1 A 7.2.1
PROCESS DOCUMENTATION
INSTRUCTORS: Lisa Findley Tom Silva
A 3.0
Material Layout Diagram Material/Structural/Screen Preceents Material Research: Ventwood Material Research: Glazing Material Research: ETFE Structure and Materials Research Fog and Atmosphere Research Structure Research: Space Frame Connection
A 7.0
Level 01 Egress Diagram Level 02 Egress Diagram Level 03 Egress Diagram Level 01 Accessability Diagram Level 02 Accessability Diagram Level 03 Accessability Diagram Site Accessability / Ramps Diagram
SF Fog Por[t]ch
A 2.1 A 2.2.1 A 2.2.2 A 2.2.3 A 2.2.4 A 2.2.5 A 2.2.6 A 2.2.4
BUILDING MATERIALS & ASSEMBLIES
A 6.1.1 A 6.1.2 A 6.1.3 A 6.2.1 A 6.2.2 A 6.2.3 A 6.2.4
TITLE:
A 2.0
A 6.0 LIFE SAFETY, ACCESSIBILITY, & BUILDING SERVICE SYSTEMS
Zachary Moore / Kristina Kotlier
ENVIRONMENTAL SYSTEMS
ARCHITECTURE, LLC
M 5.0
CCA, FALL 2012
SITE ANALYSIS & CONTEXT
DATE: Dec. 16, 2012
INDEX
A 1.0
SCALE:
COVER SHEET
JOB: SF Ferry Terminal
A 0.0
SHEET:
INDEX
ARCHITECTURE, LLC
Site Analysis and Context SHEET:
A 1.0
1992
Adaptive Reuse renovation by BCV Architects, San Francisco. Addition of “marketplace environmet” inside and farmer’s market outside. Embarcadera Freeway demolished as a result from Loma Prieta Freeway. This opens up a whole new reaction to the waterfront from Market Street and helps connect people more to the Ferry Building.
This project addresses the needs of a variety of cultural differences, means of public space, and modes of public transportation, including ferries, bicycles and pedestrians.
20
Zachary Moore / Kristina Kotlier
ARCHITECTURE, LLC
CCA, FALL 2012
LOCATION: San Francisco, CA
2003
Tourists from around the world visit San Francisco and tour the Ferry Building. In 2010, 16 million visitors came to San Francisco to appreciate the international culture, mediterranean weather, and the varied landscape, which offers stunning views of the Pacific Ocean, the San Francisco Bay, and a world-class city.
INSTRUCTORS: Lisa Findley Tom Silva
Bay Bridge and Golden Gate Bridge Completed. Residents and tourists begin to rely on motorized, and land based transportation.
Soon people from Palo Alto, Berkeley, Redwood City, Richmond and Treasure Island will have access and transportation routes to the new ferry terminal. As the ferrys improve and add new routes to new locations, an increase in the demand for people capacity will happen. The ferry building houses a compatible environment for persons from a multi-cultural background.
TITLE: Ferry Building Timeline
Original Ferry Building built in San Francisco to transport passengers from Oakland and surrounding areas. Becomes a cultural hub of San Francisco, A Porch to the great western city
20
19 A new Beaux Arts Style ferry building designed by architect A. Page Brown replaces the old wooden structure.
1935
196X
12
50
50 18
1898
50
1946
SITE
DATE: Dec. 16, 2012
2012
SCALE:
The Ferry Building brings tourists and residents together in a context that is dynamic and historic. As early as 1860, in the nascent days of San Francisco, the Ferry Building became highly functional as a means to travel across the bay. As automobiles developed and the finishing of the Bay and Golden Gate bridges in 1935-37, the need for ferries diminished. Soon cars became the dominant modes of travel. Eventually, rapid increases in transportation costs made public transportation more accessible and usable, and today the Ferry Terminal sees use in ferry boats, BART, MUNI, and bicycle transportation in a pedestrian friendly environment.
JOB: SF Ferry Terminal
The conditions situated around the Ferry Building involve several key cultural demands. The ferry terminal acts as a hub for commuters and tourists connecting key cities around San Francisco Bay. The farmer’s market addresses local needs for both the local community and visitors to the region. The concept of farmer’s market community gardens (two keys in urban communication patterns that are developing in the last 10-20 years.)
SF Fog Por[t]ch
San Francisco Fog Por[t]ch
SHEET:
A 1.1.1
ARCHITECTURE, LLC
Ferry Building
ETFE (ethylene tetrafluoroethylene) roof membrane
Pratt truss structural system
Bike Kitchen (DIY bicycle repair shop)
Bed Rock
Zachary Moore / Kristina Kotlier
Ferry Landing Lounge (2-level)
CCA, FALL 2012
1’ Ø roof “tree” columns @ ~40’ spacing
SF Fog Por[t]ch
Exterior belvedere
Bike storage (enclosed, not conditioned) 18” Ø Concrete Piers @ 6’ o.c.
SCALE:
TITLE: Geologic Section Cut
LOCATION: San Francisco, CA
JOB: SF Ferry Terminal
DATE: Dec. 16, 2012
INSTRUCTORS: Lisa Findley Tom Silva
BART Vent Shaft Bay Mud
BART Bay Tube
BART
SHEET:
A 1.1.2
ARCHITECTURE, LLC
Daily commuter trips into dowtown San Francisco - 350,000 workers commute to greater downtown San Francisco per day - 148,000 take public transit
S.B.
gg ferries
1%
0%
8%
0%
bart, caltrain, muni metro
50%
5%
0%
27%
muni, ac transit, samtrans
4%
30%
13%
11%
automobile
45%
39%
75%
60%
0%
27%
4%
2%
walk, bike
Zachary Moore / Kristina Kotlier
N.B.
LOCATION: San Francisco, CA
S.F.
INSTRUCTORS: Lisa Findley Tom Silva
E.B.
CCA, FALL 2012
south bay commuters
TITLE: SF Contour Map
north bay commuters
DATE: Dec. 16, 2012
san francisco commuters
SCALE:
east bay commuters
JOB: SF Ferry Terminal
- 158,000 drive
SF Fog Por[t]ch
- 40,000 arrive on foot or bike
SHEET:
A 1.1.3
75 - 79 (garbage disposal)
SCALE: TITLE: SF Noise Map LOCATION: San Francisco, CA
DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
65 - 74 (vacuum cleaner)
JOB: SF Ferry Terminal
60 - 64 (dishwasher 10ft)
SHEET:
A 1.1.4
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
streets (pedestrian access)
SCALE: TITLE: SF Circulation Modes LOCATION: San Francisco, CA
DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
public transportation (land only)
JOB: SF Ferry Terminal
bike paths
SHEET:
A 1.1.5
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SCALE: TITLE: SF Site Conditions LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012
SHEET:
INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
STREETS BARRIERS TENSION SOCIAL DISCOMFORT FARMERS MARKET SHOPPERS FERRY COMMUTERS TOURISTS
A 1.1.6
SHEET:
A 1.1.7
SCALE: TITLE: Ferry Market Circulations LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
A 1.1.8
SCALE: TITLE: SF Ferry Boat Map LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
30°
20°
J F M A M J J A S O N D LOCATION: San Francisco, CA
40°
INSTRUCTORS: Lisa Findley Tom Silva
60°
SHEET:
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
Comfort Zone
TITLE: SF Annual Weather Diagram
70°
DATE: Dec. 16, 2012
80°
SCALE:
90°
JOB: SF Ferry Terminal
100° F
50°
A 1.2.1
ARCHITECTURE, LLC
15mph
15mph
ph MORNING
AFTERNOON AFTERNOON
EVENING
LOCATION: San Francisco, CA
12m INSTRUCTORS: Lisa Findley Tom Silva
Summer Average Daily Wind Cycles (December 21)
ph
15
m
h
ph
5mp
SHEET:
Zachary Moore / Kristina Kotlier
ARCHITECTURE, LLC
Winter Average Daily Wind Cycles
CCA, FALL 2012
15 m
FALL
10m
ph
WINTER
(August 21)
SF Fog Por[t]ch
EVENING
TITLE: SF Annual Wind Diagrams
AFTERNOON
DATE: Dec. 16, 2012
SUMMER
MORNING
AFTERNOON
SCALE:
(June 21)
15mph
JOB: SF Ferry Terminal
MORNING
ph
m
10
SPRING h ph
(March 21)
mp m
EVENING
13 15
ph
ph
12m
8m
ph
ph ph
m EVENING
m
10 MORNING
10
Spring Average Daily Wind Cycles ph m 15
ph
ph m
5m ph m 15
10
5m
Fall Average Daily Wind Cycles
A 1.2.2
Sea level
12a
F M A
6a
M J J
12p
A S O
6p
N
8’
6’
4’
2’
0’
-2’ Mean Low Tide
-4’
Mean Lower Low Tide
-6’
-8’ 12a Mean High Tide
SHEET:
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
D
LOCATION: San Francisco, CA
J Spring tide
INSTRUCTORS: Lisa Findley Tom Silva
SITE
TITLE: SF Tidal Flow Diagram
New Moon
DATE: Dec. 16, 2012
Neap tide
SCALE:
Full Moon
JOB: SF Ferry Terminal
ARCHITECTURE, LLC
28 Day Lunar Cycle
Spring tide
Mean Higher High Tide
A 1.2.3
8a 11a 2p 5p 8p
Summer
Winter LOCATION: San Francisco, CA
8p
INSTRUCTORS: Lisa Findley Tom Silva
5p
SHEET:
Zachary Moore / Kristina Kotlier
ARCHITECTURE, LLC
8p
CCA, FALL 2012
SF Fog Por[t]ch
Spring/Fall
TITLE: SF Sunlight Study Diagram
2p
5p
DATE: Dec. 16, 2012
11a
2p
SCALE:
8a
11a
JOB: SF Ferry Terminal
8a
A 1.2.4
ARCHITECTURE, LLC
March- November Mid-day Fog
March- November Morning/Evening Typical Fog
Mt. Tam
Mt. Tam
Twin Peaks
Twin Peaks
Potrero Hill
Potrero Hill
Bernal Heights
Bernal Heights
Mt. Davidson
Mt. Davidson
March- November Morning/Evening Extreme Fog
Mt. Tam
November-March Winter Advection Fog (Tule)
Zachary Moore / Kristina Kotlier
Nob Hill
Nob Hill
CCA, FALL 2012
SITE
Russian Hill
SITE
SF Fog Por[t]ch
Telegraph Hill
Telegraph Hill Russian Hill
Mt. Tam
Telegraph Hill
SCALE:
TITLE: SF Fog Diagram
LOCATION: San Francisco, CA
DATE: Dec. 16, 2012
INSTRUCTORS: Lisa Findley Tom Silva
SITE
Russian Hill Nob Hill
Twin Peaks Potrero Hill
Twin Peaks Potrero Hill
Bernal Heights Mt. Davidson
JOB: SF Ferry Terminal
Telegraph Hill
SITE
Russian Hill Nob Hill
Bernal Heights Mt. Davidson
SHEET:
A 1.2.5
mento
G
un
M
et
re
St
ro
et iM
M
ro
et iM
un
r
ea
Sp
et
re
St
B E
Stree
D
W ay
D C
C LOCATION: San Francisco, CA
A
SHEET:
Zachary Moore / Kristina Kotlier
ARCHITECTURE, LLC
-122°23'20"
CCA, FALL 2012
SF Fog Por[t]ch
F
INSTRUCTORS: Lisa Findley Tom Silva
eet Clay Str
-122°23'25"
TITLE: Site Views Diagram
t
ar eu
St
on e he
-122°23'30"
DATE: Dec. 16, 2012
-122°23'35"
SCALE:
-122°23'40"
JOB: SF Ferry Terminal
a
a
az
pl
az
rry
fe
Pl
o
er
ad
rc
ba
Em
Street Fe rr y
e
Th
Drumm
Sacra
et
ro de
a rc ba
et
re
Em
n Stre
St
e Th
to hing Was
si on
-122°23'45"
is
-122°23'50"
M
5" -122°23'15"
treet ercial S Comm
t
A 1.2.6
SHEET:
INSTRUCTORS: Lisa Findley Tom Silva
LOCATION: San Francisco, CA
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
ARCHITECTURE, LLC
12/12 4:30PM
SF Fog Por[t]ch
12/12 8:15AM TITLE: Sunrise/Sunset Analysis Diagram
6/4 8:15PM
DATE: Dec. 16, 2012
6/4 8:15PM
SCALE:
6/4 5:45AM
JOB: SF Ferry Terminal
10/4 6:30PM
A 1.2.7
Roof for Molinete Roman Ruins by Amann-Cรกnovas-Maruri Architects Murcia, Spain SHEET:
A 1.3.1
LOCATION: San Francisco, CA
TITLE: Molinete Ruins Precedent Study DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
SCALE: JOB: SF Ferry Terminal
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
A 1.3.2
SCALE: TITLE: Precedent Study LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
ARCHITECTURE, LLC
Building Materials and Assemblies SHEET:
A 2.0
GLASS CURTAIN WALL
LOCATION: San Francisco, CA INSTRUCTORS: Lisa Findley Tom Silva
COURTYARD W/CINEMA SCREEN
SHEET:
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
LOUNGE
TITLE: Material Layout Diagram
BIKE STORAGE
INTERIOR WAITING
DATE: Dec. 16, 2012
BIKE KITCHEN
SCALE:
EXTERIOR WAITING
JOB: SF Ferry Terminal
INTERIOR WAITING
OUTDOOR LOUNGE SEATING
WOOD PANEL SYSTEM
A 2.1
ARCHITECTURE, LLC
Screen materials SHEET:
LOCATION: San Francisco, CA
TITLE: Material/Structural/Screen Preceents DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
SCALE: JOB: SF Ferry Terminal
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
Transparent Materials
Roof support structure
A 2.2.1
ARCHITECTURE, LLC
SCALE: TITLE: Material Research: Ventwood LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012
SHEET:
INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
Ventwood Panel System Research Duce Timber
A 2.2.2
ARCHITECTURE, LLC
SCALE: SCALE: TITLE: TITLE: Structural Reference Material Research: Glazing LOCATION: LOCATION: San Francisco, CA Ferry Plaza, San Francisco CA 94110
DATE: DATE: Dec. 16, 2012 PHASE: INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
Material | Structure SF Fog Por[t]ch ReferenceCCA, FALL 2012
New York Times Building Facade / Transparency Study
CLIENT(S): JOB: Tom SilvaTerminal and Lisa FIndley SF Ferry
Glass Material Research
SHEET: SHEET:
AP-03 2.2.3
ARCHITECTURE, LLC
Zachary Moore / Kristina Kotlier
ARCHITECTURE, LLC LOCATION: San Francisco, CA INSTRUCTORS: Lisa Findley Tom Silva
DATE: Dec. 16, 2012
LOCATION: Ferry Plaza, San Francisco TITLE: CA 94110 Material Research: ETFE
PortPorch CBD Studio
TITLE: SCALE:
DATE: JOB: SF Ferry Terminal PHASE:
SCALE:
The ETFE cushions allow a high level of natural daylight into the building, which passively heats up the building and pool water and thus maximizing energy efficiency. The variation in shading of the facades is achieved by screening the membrane with translucent fritting. The material allows for ventilation of heat out of the cavity in summer and containment of heat in winter to help further reduce energy consumption. Furthermore, in order to protect the membrane façade from corrosion due to condensation and evaporative chlorine, air nozzles have been placed around the perimeter of the building spraying air up the walls to regulate temperature and provide constant air movement.
CLIENT(S): Tom Silva and Lisa FIndley
ETFE is a tough, durable plastic closely related to PTFE, commonly known as Teflon. It transmits more UV light than glass and, like Teflon, is non-stick, non-staining and therefore requires no cleaning. An estimated 20,000 people are expected to use the Water Cube at any one time. And although ETFE is combustible, it is fired-rated and complies with China’s prescriptive building code with its performance in fire safety. It is non-flammable, self-venting (it melts itself) and lets the smoke out of the building.
SF Fog Por[t]ch
Some of the bubble cladding are as large as 9 meters across. The roof is made of 7 different bubble-types, the walls of 15, which are repeated throughout. Despite this repetition, a random pattern is created. Each pillow is permanently inflated by a pump, and this internal air pressure transforms a 0.2-mm-thick plastic into a cladding panel capable of spanning relatively long distances. In pillow form, ETFE is also a better insulator than glass and, when equipped with frit patterns for shading, achieves the desired light-diffusing effect. While the material is translucent blue during the day, at night it is lit by an LED system.
CCA, FALL 2012
Material Research - EFTE
SA-01 A 2.2.4
SHEET:
SHEET:
SHEET:
SA-01 A 2.2.5 SHEET:
INSTRUCTORS: Lisa Findley Tom Silva
DATE: Dec. 16, 2012
LOCATION: San Francisco, CA
SCALE: LOCATION: Ferry Plaza, San Francisco TITLE: CA 94110 Structure and Materials Research
TITLE:
DATE:
JOB: SF PHASE: Ferry Terminal
SCALE:
CLIENT(S): Tom Silva and Lisa FIndley
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
PortPorch CBD Studio ARCHITECTURE, LLC
Structure and Materials Research
SHEET:
SA-01 A 2.2.6 SHEET:
INSTRUCTORS: Lisa Findley Tom Silva
DATE: Dec. 16, 2012
LOCATION: San Francisco, CA
LOCATION: Ferry Plaza, San Francisco TITLE: CA 94110
SCALE:
TITLE:
DATE:
JOB: SF Ferry Terminal PHASE:
SCALE:
CLIENT(S): Tom Silva and Lisa FIndley
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
PortPorch CBD Studio
ARCHITECTURE, LLC
Fog and Atmosphere Research
SHEET:
A 2.2.7
LOCATION: San Francisco, CA
TITLE: Structure Research: Space frame connection DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
SCALE: JOB: SF Ferry Terminal
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
ARCHITECTURE, LLC
Architecture SHEET:
A 3.0
SHEET:
A 3.1.1
SCALE: TITLE: SE Perspective Render LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
A 3.1.2
SCALE: TITLE: Upper Belvedere Render LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
A 3.1.3
SCALE: TITLE: W Section Render LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
A 3.2
SCALE: 1” = 60’ - 0” TITLE: Site Plan LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
UP
EXTERIOR WAITING
INTERIOR WAITING
+ 0”
LOUNGE COURTYARD W/CINEMA SCREEN
+ 8”
OUTDOOR LOUNGE SEATING + 8”
BIKE STORAGE
+ 0”
UP
+ 0”
UP
LOCATION: San Francisco, CA INSTRUCTORS: Lisa Findley Tom Silva
FLOOR AREA RATIO: .13 MATERIALS WOOD DECKING
SECTION B
TITLE: Level 01 Floor Plan
SECTION C
DATE: Dec. 16, 2012
+ 0”
SCALE: 1” = 60’ - 0”
BIKE KITCHEN
SECTION A
JOB: SF Ferry Terminal
+ 0”
+ 8”
Zachary Moore / Kristina Kotlier
ARCHITECTURE, LLC + 8”
CCA, FALL 2012
INTERIOR WAITING + 8”
SF Fog Por[t]ch
UP
POLISHED CONCRETE ASPHALT
FLOOR PLAN - GROUND LEVEL 1
SCALE - 1:60
SHEET:
A 3.3.1
FLOOR PLAN - LEVEL 2 SCALE - 1:60
TITLE: Level 02 Floor Plan LOCATION: San Francisco, CA
DATE: Dec. 16, 2012
SHEET:
INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
FILM ROOM
SCALE: 1” = 60’ - 0”
LOUNGE MEZZANINE
JOB: SF Ferry Terminal
FLYOVER
A 3.3.2
ARCHITECTURE, LLC
FLOOR PLAN - LEVEL 3 SCALE - 1:60
SCALE: 1” = 60’ - 0” TITLE: Level 03 Floor Plan LOCATION: San Francisco, CA
DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
ENCLOSED BELVEDERE
JOB: SF Ferry Terminal SHEET:
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
REFLECTING POOL REF. POOL
BELVEDERE
A 3.3.3
ARCHITECTURE, LLC
SHEET:
SECTION A- SCALE: 1” - 60’
A 3.4.1
SCALE: 1” = 60’ - 0” TITLE: Section A-A LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
SECTION B - SCALE: 1” - 30’
A 3.4.2
SCALE: 1” = 30’ - 0” TITLE: Section B-B LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
SECTION C - SCALE: 1” - 30’
A 3.4.3
SCALE: 1” = 30’ - 0” TITLE: Section C-C LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
A 3.5.1
SCALE: TITLE: Project Final Model LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
ARCHITECTURE, LLC
Structural Systems SHEET:
S 4.0
SCALE: ½” = 1’ - 0” TITLE: Wall Section: Lounge LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Wood Decking
Operable Windows
Curtain Wall
Double Glazing
Open Web Steel Joist
Metal Decking
SHEET:
S 4.1.1
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
Existing Pier
Rigid Insulation
Radiant Floor System
Polished Concrete Floor
ARCHITECTURE, LLC
SF Fog Por[t]ch
Ventilated Wood Panel System 1” x 4” Cement Siding Hardiboard 1/2” Exterior Gypsum Board 1/2” Weather Barrier Metal Framing 6”
Zachary Moore / Kristina Kotlier
ARCHITECTURE, LLC
Open Web Steel Joist
CCA, FALL 2012
Metal Decking
Spray Foam Insulation
LOCATION: San Francisco, CA
Existing Pier
INSTRUCTORS: Lisa Findley Tom Silva
Wood Decking
Rigid Insulation
TITLE: Wall Section: Bike Kitchen
Radiant Floor System
DATE: Dec. 16, 2012
Gypsum Board with Sheet Metal
SCALE: ½” = 1’ - 0”
Polished Concrete Floor
JOB: SF Ferry Terminal
Interior Gypsum Board 1/2”
SHEET:
S 4.1.2
SHEET:
S 4.1.3
LOCATION: San Francisco, CA
TITLE: Overall Wall Sections and Structural Piers DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
SCALE: JOB: SF Ferry Terminal
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
LOCATION: San Francisco, CA INSTRUCTORS: Lisa Findley Tom Silva
Moment frame building structure TITLE: Roof Structure Exploded Axo
1’ ɸ Tree column Supports
DATE: Dec. 16, 2012
SHEET:
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
ETFE lower roof membrane
SCALE:
6” ɸ Pratt Truss structure
JOB: SF Ferry Terminal
ARCHITECTURE, LLC
ETFE Upper roof membrane
S 4.2.1
1’-0” ɸ Rim Beams
Pratt Truss
42’-0” LOCATION: San Francisco, CA
9’-0”
INSTRUCTORS: Lisa Findley Tom Silva
Rafters and Rim Beams
SHEET:
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
Pratt Truss
TITLE: Roof Structural Details
0’-6” ɸ Rafter Beams
DATE: Dec. 16, 2012
Pratt Truss 49’-0”
SCALE: 1” = 25’ - 0”
1’-0” ɸ Rim Beams
JOB: SF Ferry Terminal
ARCHITECTURE, LLC
ETFE Exterior Skin
Section Cut Line
0’-6” ɸ Upright Columns
ETFE Exterior Skin
S 4.2.2
Main Roof Columns TITLE: Roof Structural Details LOCATION: San Francisco, CA
INSTRUCTORS: Lisa Findley Tom Silva
Roof Structure Axo ETFE Exterior Skin
DATE: Dec. 16, 2012
Pratt Truss
SCALE: 1” = 25’ - 0” SHEET:
Zachary Moore / Kristina Kotlier
ARCHITECTURE, LLC
1’-0” ɸ Rim Beams
CCA, FALL 2012
SF Fog Por[t]ch
0’-6” ɸ Rafter Beams
JOB: SF Ferry Terminal
1’-0” ɸ Rim Beams
Pratt Truss
S 4.2.3
TITLE: ETFE Assembly Diagram LOCATION: San Francisco, CA INSTRUCTORS: Lisa Findley Tom Silva
ETFE C-shaped hanger
DATE: Dec. 16, 2012
8” steel tube space frame
SCALE: 1” = 1’ - 0” SHEET:
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
ETFE (ethylene tetrafluoroethylene) roof membrane
JOB: SF Ferry Terminal
4” steel tube upright support
3 ½” offset from space frame
36°
S 4.2.4
ARCHITECTURE, LLC
ARCHITECTURE, LLC
Environmental Systems SHEET:
M 5.0
Radiant Floor Heating
COLD AIR FROM BAY
SHEET:
INSTRUCTORS: Lisa Findley Tom Silva
Boiler
LOCATION: San Francisco, CA
TITLE: Passive Building Energy Diagram
Operable Windows
DATE: Dec. 16, 2012
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
Roof Vents
SCALE:
WINTER SUN
JOB: SF Ferry Terminal
ARCHITECTURE, LLC
SUMMER SUN
M 5.1
ARCHITECTURE, LLC
Life Safety, Accessibility, & Building Service Systems SHEET:
A 6.0 7.0
+ 0”
+ 0” UP
+ 0”
TOTAL SQUARE FEET - 12,693 SQUARE FEET PER OCCUPANT - 15 OCCUPANT LOAD OF AREA - 846
LOCATION: San Francisco, CA
+ 8”
INSTRUCTORS: Lisa Findley Tom Silva
+ 8”
SHEET:
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
+ 0”
TITLE: Level 01 Egress Diagram
+ 8”
DATE: Dec. 16, 2012
UP
SCALE:
+ 8”
JOB: SF Ferry Terminal
UP
+ 0” + 8”
UP
A 6.1.1
ARCHITECTURE, LLC
SCALE: TITLE: Level 02 Egress Diagram LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
TOTAL SQUARE FEET - 6,623 SQUARE FEET PER OCCUPANT - 20 OCCUPANT LOAD OF AREA - 331
SHEET:
A 6.1.2
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SCALE: TITLE: Level 03 Egress Diagram LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
TOTAL SQUARE FEET - 3,198 SQUARE FEET PER OCCUPANT - 15 OCCUPANT LOAD OF AREA - 213
SHEET:
A 6.1.3
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
+ 0” + 8”
+ 0” UP
+ 0” + 8”
UP
+ 0”
LOCATION: San Francisco, CA
+ 8”
INSTRUCTORS: Lisa Findley Tom Silva
UP
SHEET:
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
BB
TITLE: Level 01 Accessability Diagram
+ 8”
DATE: Dec. 16, 2012
UP
SCALE:
BB
JOB: SF Ferry Terminal
ARCHITECTURE, LLC
AA
AA
+ 8”
+ 0”
A 6.2.1
SHEET:
A 6.2.2
SCALE: TITLE: Level 02 Accessability Diagram LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
A 6.2.3
SCALE: TITLE: Level 03 Accessability Diagram LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
+ 8” UP + 0”
+ 8”
RAMP A
Zachary Moore / Kristina Kotlier
ARCHITECTURE, LLC + 8”
CCA, FALL 2012
SF Fog Por[t]ch
RAMP B
+ 8”
+ 0” RAMP C
+ 0”
8” VERTICAL HEIGHT - ALL RAMPS ADA REQUIRED MINIMUN LENGTH OF RAMP - 8’ RAMP A, B - 44’ 7” RAMP C - 39’ 6” RAMP D - 34’ 6” ALL RAMPS MEET MINIMUN 1:12 SLOPE
SHEET:
LOCATION: San Francisco, CA
RAMP D
UP
INSTRUCTORS: Lisa Findley Tom Silva
TITLE: Site Accessability / Ramps Diagram
+ 0”
DATE: Dec. 16, 2012
+ 8”
UP
SCALE:
+ 0”
JOB: SF Ferry Terminal
UP
A 6.2.4
ARCHITECTURE, LLC
Process Documentation SHEET:
A 7.0 8.0
Conceptual Material Sketch Conceptual Building Sketch SHEET:
INSTRUCTORS: Lisa Findley Tom Silva
LOCATION: San Francisco, CA
TITLE: Initial Conceptual Sketches / Models DATE: Dec. 16, 2012
Conceptual Building Sketch SCALE:
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
Site Analysis Gesture Model 02
JOB: SF Ferry Terminal
Site Analysis Gesture Model 01
A 7.1.1
ARCHITECTURE, LLC
Ferry Building
Farmer’s Market Shading Farmer’s Market Shading
Longitudinal Section Longitudinal 01 Section 01 Longitudinal Section 02
Transverse Section 01
Belvedere
Promenade
Bike Dismount Zone
ARCHITECTURE, LLC SCALE:
TITLE: Concept: Site Plan / Sections
LOCATION: San Francisco, CA
DATE: Dec. 16, 2012
INSTRUCTORS: Lisa Findley Tom Silva
Farmer’s Market Shading Transverse Section 02
Site Plan Sketch
JOB: SF Ferry Terminal
Transv
erse Se
ction 02
Transverse Section 01
Transverse Section 01
Transverse Section 02 Promenade Overlook
Longitudinal Section Longitudinal 02 Section 02
Belvedere Promenade
Belvedere
Overlook
Farmer’s Market Shading Farmer’s Market Shading
Zachary Moore / Kristina Kotlier
Belvedere
Promenade
SF Fog Por[t]ch
Promenade
CCA, FALL 2012
Promenade Promenade
Circulation
Circulation
Circulation
Promenade
Promenade
Belvedere
Longitudinal Section 01
Farmer’s Market Shading
SHEET:
A 7.1.2
SCALE: TITLE: Concept Model 01 LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012
SHEET:
INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
Concept Model 01
A 7.1.3
ARCHITECTURE, LLC
ARCHITECTURE, LLC Belvedere/Promenade
SCALE:
TITLE: Spatial Program / Circulation Diagram
JOB: SF Ferry Terminal
DATE: Dec. 16, 2012
Underwater Feature Overlook
Reflection Pool Vertical Circulation
Ferry Plaza
Belvedere/Promenade
Conceptual Program Massing
Zachary Moore / Kristina Kotlier
Vertical Circulation
Farmer’s Market
SHEET:
LOCATION: San Francisco, CA
Tourist/Public Circulation
INSTRUCTORS: Lisa Findley Tom Silva
Ferry Building
CCA, FALL 2012
Ferry Terminal
SF Fog Por[t]ch
Commuter Circulation
A 7.1.4
ARCHITECTURE, LLC
Courtyard “opening”
The exit from the eastern ferryway leads the passengers through an "opening" into the coutyard. Directly in front of them the exposed vent shaft.
Belvedere
SHEET:
Zachary Moore / Kristina Kotlier LOCATION: San Francisco, CA
Theatre Balcony
INSTRUCTORS: Lisa Findley Tom Silva
Flyover
Promenade
CCA, FALL 2012
TITLE: Structural / Material / Energy Reivew 01
Flat Ground, (for fishing)
DATE: Dec. 16, 2012
Seating
SCALE:
Pathway around (bikes + peds)
SF Fog Por[t]ch
Courtyard
JOB: SF Ferry Terminal
To be removed?
A 7.1.5
2
3 Section 2 1" = 60'-0"
Section 3 1" = 60'-0"
2 Section 1 1" = 60'-0"
Section 2 1" = 60'-0"
A101
A102
Promenade
PRODUCED BY AN AUTODESK STUDENT PRODUCT
SHEET:
LOCATION: San Francisco, CA
PRODUCED BY AN AUTODESK STUDENT PRODUCT
Belvedere
Tom Silva
-
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch
e
PRODUCED BY AN AUTODESK STUDENT PRODUCT INSTRUCTORS:
nad
A 7.1.6
Lisa Findley Unnamed
P e rom
e
TITLE: Visibility Sturdies / Site Analysis / Roof Diagramming
ng
DATE: Dec. 16, 2012
Lou
SCALE:
PHASE: Checker
Waiting
JOB: SF Ferry Terminal
Bike Stg
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PHASE: Checker
1
DRAWN BY: Author
UP
LOCATION: Checker
PRODUCED BY AN AUTODESK STUDENT PRODUCT A103
DATE: Issue Date
PRODUCED BY AN AUTODESK STUDENT PRODUCT Shop
Unnamed
Mech
Waiting
SCALE: 1" = 60'-0"
PHASE: Checker
DRAWN BY: Author
SCALE: 1" = 40'-0"
LOCATION: Checker
Mech Shop
CLIENT: Project Number
DRAWN BY: Author
LOCATION: Checker
UP
PRODUCED BY AN AUTODESK STUDENT PRODUCT
Unnamed
DATE: Issue Date
-
DATE: Issue Date
SCALE: 1" = 60'-0"
Section 1 1" = 60'-0" -
CLIENT: Project Number
1 -
Unnamed
ARCHITECTURE, LLC
PRODUCED BY AN AUTODESK STUDENT PRODUCT
CLIENT: Project Number
-
Y AN AUTODESK STUDENT PRODUCT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
SHEET:
A 7.1.7
SCALE: TITLE: Structural Review 02 LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
ARCHITECTURE, LLC M|S
T|W
T|W
T|W
T|W T|W
T|W
M|S
M|S B|S
B|S O|C
O|C
FLOORPLAN - LEVEL 1 SCALE| 1:20 n^
FLOORPLAN - LEVEL 1 SCALE| 1:20 n^
M|C - MECH. SHOP T|W - TERMINAL WAITING C|L - CAFE | LOUNGE B|S - BIKE STORAGE O|C - OUTDOOR CINEMA
M|C - MECH. SHOP T|W - TERMINAL WAITING C|L - CAFE | LOUNGE B|S - BIKE STORAGE O|C - OUTDOOR CINEMA
Roof study 01
Roof study 03
Zachary Moore / Kristina Kotlier
C|L
CCA, FALL 2012
C|L
SF Fog Por[t]ch
M|S
SCALE:
TITLE: Roof Plan Conceptual Development DATE: Dec. 16, 2012
T|W
T|W
T|W T|W
T|W C|L
C|L
M|S
M|S B|S
B|S O|C
O|C
FLOORPLAN - LEVEL 1 SCALE| 1:20 n^
FLOORPLAN - LEVEL 1 SCALE| 1:20 n^
M|C - MECH. SHOP T|W - TERMINAL WAITING C|L - CAFE | LOUNGE B|S - BIKE STORAGE O|C - OUTDOOR CINEMA
M|C - MECH. SHOP T|W - TERMINAL WAITING C|L - CAFE | LOUNGE B|S - BIKE STORAGE O|C - OUTDOOR CINEMA
SHEET:
Roof study 02
Roof study 04
INSTRUCTORS: Lisa Findley Tom Silva
M|S
T|W
JOB: SF Ferry Terminal
M|S
LOCATION: San Francisco, CA
Winter
A 7.1.8
SHEET:
A 7.2.1
LOCATION: San Francisco, CA
TITLE: Mid-term Review Model and Renders DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
SCALE: JOB: SF Ferry Terminal
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
SECTION THRU TERMINAL (I/O) AND LOUNGE 1/8” = 1’ - 0”
A 7.2.2
LOCATION: San Francisco, CA
TITLE: Mid-term Review Model and Renders DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
SCALE: JOB: SF Ferry Terminal
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
A 7.2.3
LOCATION: San Francisco, CA
TITLE: Mid-term Review Model and Renders DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
SCALE: JOB: SF Ferry Terminal
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
A 7.2.4
LOCATION: San Francisco, CA
TITLE: Structural / Material / Energy Review 03 DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
SCALE: JOB: SF Ferry Terminal
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
A 7.2.5
LOCATION: San Francisco, CA
TITLE: Structural / Material / Energy Review 03 DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
SCALE: JOB: SF Ferry Terminal
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
A 7.2.6
LOCATION: San Francisco, CA
TITLE: Structural / Material / Energy Review 03 DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
SCALE: JOB: SF Ferry Terminal
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
A 7.2.7
SCALE: TITLE: LOCATION: San Francisco, CA
JOB: SF Ferry Terminal DATE: Dec. 16, 2012 INSTRUCTORS: Lisa Findley Tom Silva
Zachary Moore / Kristina Kotlier
CCA, FALL 2012
SF Fog Por[t]ch ARCHITECTURE, LLC
SHEET:
FINAL
ARCHITECTURE, LLC