BANDAR MERSING (OVERALL) ITEM

DESCRIPTION

Project Title

Proposed Master Plan Mersing Urban Renewal and Waterfront Development

Client

Majlis Daerah Mersing

Developer

Radiant Starfish Development Sdn. Bhd

C&S Engineer

Sepakat Teguh Engineering

M&E Engineer

Ryad Hassan Associate

Contract Sum

RM20,000,000

Involvement

• Idea and Inspiration for Iconic Sculpture • 3D illustration for Iconic Sculpture • Superimpose to Actual Site

Software Application

• Manual Sketches • 3D SketchUp • 3D Lumion • Adobe Photoshop

Landscape Architect

• Mr Mohd Fadrillah bin Mohd taib • Mr Haji Abdul Hakim bin Kussim • Mr Al Naim bin Jaafar


Introduction A revitalization of Mersing town through an inspired modern redevelopment incorporating iconic waterfront facilities, theme hotel, residential, and commercial zones, land and sea logistical amenities within landscaped tropical parks and walkways.

Concept 1. To inspire a New Mersing Identity by integrating the exiting urban fabric with lush green vistas and expansive waterscapes 2. To allow nature to flow around the site in multiple

Objectives 1. The Master Plan proposes a comprehensive and eco-friendly mix of quality modern residential, iconic civic & commercial zones, recreational parks and facilities. 2. To provide a sustainable & mixed development model complementing the exiting town & it’s environs

themes 3. Iconic statements have been delicately situated to create a subtle yet long lasting impression for all patrons to the site

Theme


Ta s k s In the process of completing the master plan for Bandar Mersing , I have been given a task to designed the 7 iconic sculpture for the whole Bandar Mersing.

Reference Images for Iconic Sculpture

The first step was searching for reference images. The iconic sculpture must be excusive and represent the identity of Bandar Mersing. Marine life concept was chosen in order to symbolized the waterfront. After generating ideas from reference Overall Master Plan by Landscape Architect LEGEND Iconic Sculpture

images few iconic were designed.


Design Process 1 (Iconic Sculpture)

Idea 3

Idea 2

Idea 1

Design Process 1 : Idea for earlier stage with the combination reference

of

images

needed more research in order to came out with creative design of the according Idea 4

waterfront to

the

Landscape Architect.

Idea 5


Design Process 2 (Iconic Sculpture)

Design Process 2 : According to the Landscape Architect the 2nd Design process were lack of abstract , too solid and stiff.

Idea 2

Idea 1 Idea 3

Idea 5 Idea 4

Idea 7

Idea 6


Design Process 3a (Iconic Sculpture)

Material option 1

Finally the 3rd Design Process of Iconic

Sculpture

accepted Architect

by

the

and

ideas

were

Landscape Morphosis

authority. Inspired by the weeds of marine life, the iconic sculpture can be abstract for a amazing Reference Images

sculpture.

Material option 2


Design Process 3a (Iconic Sculpture)

Day view of the Iconic sculpture

Sculpture design presentation with the developer

Alhamdulillah, the feedback was good which Mr Yusof as representative of the developer from Radiant Starfish

Development

satisfied

with

the

design

presented by Morphosis Design . With the successful of design process 3a for iconic sculpture the developer entrusted Morphosis Design with the continuation of the Bandar Mersing sculpture design. Night view of the iconic sculpture


Design Process 3b (Iconic Sculpture)

Iconic Sculpture inspired by dolphin

Material option 1

Reference Images

Material option 2

The Iconic Sculpture of design process 3b was accepted by the Landscape Architect and the Design Manager. The sculpture was inspired by a dolphin which in horizontal shape as the sculpture will be located near the road


Design Process 3b (Iconic Sculpture)

Day view of the sculpture

Night view of the sculpture


Design Process 3c (Iconic Sculpture) Inspired by weeds the Iconic Sculpture icon be construct with few Clock

options. Tower

Functional the

and

as

a

Road

Direction the sculpture will be located in between the buildings.

Reference Images

Material option 1

Material option 2


Design Process 3c (Iconic Sculpture)

Day view of the sculpture

Night view of the sculpture


Design Process 4a (Entrance Signage)

Sketch idea for Signage Sketch Idea for Bench


Design Process 4b (Entrance Signage)

Reference images

Perspective view of Entrance Signage

At first the design was accepted but it changed to a new design.

Sketch Idea for Entrance Signage

3D llustration for Entrance Signage

Superimpose with actual Location


Design Process 4c (Entrance Signage)

The Day View

3D Illustration

Entrance Signage Design by : Mr hakim Illustrated by : ZaediAsri Sketch idea by Mr Hakim The Night View


Design Process 5 (Archway)

3D llustration for Archway (SketchUp)

3D llustration for Archway (Lumion)

The day view

The night view

The concept basically from coral which the materials are the combination of concrete and light metal for exclusivity look.


Design Process 6a (Others)

Sketch idea for Bollard

Sketch idea for Lighting pole


Design Process 6b (Others)

Bollard Designed by : Mr Hakim Illustrated by : ZaediAsri

Rubbish Bin Designed by : Mr Hakim Illustrated by : ZaediAsri

Bench Designed by : Mr Hakim Illustrated by : ZaediAsri

Information Signage Designed by : Mr Hakim Illustrated by : ZaediAsri


BANDAR MERSING (PHASE 1) ITEM

DESCRIPTION

Project Title

Proposed Landscape Master Plan for Mersing Urban Renewal, Johor Darul Takzim (Phase 1) for Messrs. Radiant Starfish Development Berhad

Client

Majlis Daerah Mersing

Developer

Radiant Starfish Development Sdn. Bhd

C&S Engineer

Sepakat Teguh Engineering

M&E Engineer

Ryad Hassan Associate

Contract Sum

RM8,000,000

Involvement

• Digitize Pocket Park 1, Pocket Park 2, Pocket Park 3 • 3D illustration for overall Mersing Town (Phase 1) • Working Drawing (Layout Plan with Section Elevation, Dimension Plan, Overlay Underground Utility plan)

Software Application

• AutoCAD • 3D SketchUp • 3D Lumion

Landscape Architect

• Mr Mohd Fadrillah bin Mohd taib • Mr Haji Abdul Hakim bin Kussim • Mr Al Naim bin Jaafar


Ta s k s The developer ordered to stress on the phase 1

Each of the Pocket Park had sketch by Mr. Haji Mohd

compared to others. Again, Morphosis worked hard

Hakim. Task given for me was digitizing all the plans

to complete the phase 1 design in limited time given.

by using AutoCAD software.

There are 5 areas in phase 1.

Pocket park 1 (Area 2)

AREA 2 (Pocket Park 1)

AREA 3 (Pocket Park 2)

AREA 1 (Iconic Sculpture 1)

Design by : Mr hakim Illustrated by : ZaediAsri AREA 4 (Iconic Sculpture 2)

AREA 5 (Pocket Park 3)

Pocket park 3 (Area 5) Design by : Mr hakim Illustrated by : ZaediAsri

Pocket park 2 (Area 3) Design by : Mr hakim Illustrated by : ZaediAsri


Pocket Park 1

Pocket

Park

1

illustrated

by

me

for

presentation to Majlis Daerah Mersing. This park become a transit area between road.

Ariel view Pocket Park 1

Perspective 2

Perspective 1

Perspective 3


Pocket Park 2

Pocket Park 2 are open space beside the shop lots. Designed a seating area with tensile.

Plan view of Pocket Park 2

Perspective 1

Ariel view

Perspective 2


Pocket Park 3

Pocket Park 3 have two different area. First area at the left side that designed a pocket park with tensile and seating area. The other side

is

linear

park

that

allocated

of

Decorative Water Fountain . Have 6 fountain there that represent island at mersing area. Then, also have green wall that designed with high technology, but, overall images created for presentation. The new design change according to Survey Plan and Plan view of Pocket park 3

Perspective 1

Underground Utility Plan.

Perspective 2


View Towards Decorative Fountain

View towards Green Wall


After digitizing process for the plans the combination process for each plan were by the surveyor. There were minimum adjustment at plan to be fixed on survey plan. Plan of Iconic Sculpture 1 and Iconic Sculpture 2 also combined together with the Survey plan.

Working Drawing : Overall Layout Plan


The overlay process with Underground Utility Plan been done to ensure the constructions work would not destroy the existing underground piping. If there was overlapping the design need to be adjust in order to prevent from any problem.

Overlay of Area 2 : Do not have problem

Overlay of Area 1 : Do not have problem

Overlay of Area 3 : Do not have problem


If overlay happen between underground utility plan with design plan, adjustment should be needed before proceed to working drawing. After done for adjystment, layout plan should be prepared together with supporting drawing such as perspective or section elevation. Arrange board properly that reader will understand the details when construction Layout Plan Area 3 and Area 4 with Supporting detail

Overlay of Area 5 : Do not have problem

happen later.

Layout Plan Area 1 and Area 2 with supporting detail


After finishing the layout plan with supporting detail and labeling, the important part to be done was dimensioning. In order to carry out the task easily the dimension needed as a marking process for each elements in to target the base for the design.

Layout Plan Area 3 and Area 4 with supporting detail

Layout Plan Area 5 with supporting detail

Dimension Plan Pocket park 1 (Area 2)


Dimension Plan Pocket Park 2 (Area 3)

Dimension Plan Pocket park 3 (Area 5b)

Working drawing was not that hard but there were amendments that need to made which caused the changes of the design. To prevent this thing to happen, serious discussion with client need to be done.

Dimension Plan Pocket park 3 (Area 5a)


T H E W I N N I N G T E A M O F B A N D A R M E R S I N G

Board Arrangement

Discussion of Materials

Detail up requirement

Discussion of no. board

Discussion of M&E and C&S

Detail Up Design

Adjusting the design

Discussion overlay design

Bandar Mersing is one of the biggest project of Morphosis so far. Many issues, problems, challenges that I need to faced when handling the project. This project had given me lots of experience and knowledge through my practical training. 3D Making

Working Drawing

This project also taught me the important of team work and cooperation from each of the team.


ZERO LOT CLUBHOUSE ITEM

DESCRIPTION

Project Title

Proposed Landscape for open space at club house (Zero Lot) at Lot 26623 to 27096, bandar Utama Damansara, Mukim Sungai Buloh, Daerah Petaling, Selangor Darul Ehsan

Client

Bandar Utama

Developer

Bandar Utama Development

Architect

CT Architect Sdn. Bhd

C&S Engineer

W.Lee Consulting Engineers

M&E Engineer

Leap Forth Engineers Sdn. Bhd

Quantity Surveyor

Bandar Utama Contract Department

Contract Sum

-

Involvement

• Detail Drawing • Idea for Fineshes Plan • Site Inspection

Software Application

• AutoCAD

Landscape Architect

• Mr. Mohd Zulhamin bin Zainal Abidin


Ta s k s When

I

started

with

my practical

training

at

Morphosis Design, Zero Lot was an urgent project which need to complete in limited time. All of the Construction Drawing need to be completed which I entrusted to do the detail drawing and contributing ideas in decorative wall design. For the time being Zero Lot for landscape is almost complete. Lts od design changes done to the decorative wall turned

Detail of Community Wall and ramp

into a seating area, the higher level of the decking material used and more.

Ramp in Construction Progress


Architecture Wall Pattern First idea of decorative wall

Second idea to be synchronize with architecture wall

The first idea to design the Decorative Wall at Community Area was a void wall with abstract heart decorative which means the love between the community but the design changed to architecture wall which has holes connected with ‘Yin-Yang’ design.

After

the

construction

started

client

demanded for a seating area. Convert to seating area during construction


Custom Green Curvilinear Seating Area & Playground Area

Playground designed by supplier refer to our site condition and specification

Pembinaan Green Curvilinear Seating mengikut spesification seperti didalam drawing tetapi grass crete dijadikan pavement tanpa pengetahuan consultant. As-Built drawing perlu dibuat. Grass Crete change to pavement


Green Curvilinear Seating towards playground area

Detail of decorative retaining Wall with Seating Area

Seating attach at retaining wall done for construction with same specification as drawing


Zero Lot Club House is the only project involved on the construction stage. All design already designed by the Landscape Architect. My task was on makin the detail drawing to be submitted to contractor to be construct. But, for the finishes plan, my task is to designed the pattern on the floor by using extra pavement on the site. My concept is ‘PIXEL’ which more to random patter n used.

Finishes Plan designed by ZaediAsri already implemented

The pavement almost same with the drawing and keep on the same concept


C O M M U N I T Y PA R K S S 7 , K E L A N A J AYA , S E L A N G O R ITEM

DESCRIPTION

Project Title

Redeveloped Landscape at Taman tasik Komuniti SS7 Kelana jaya, Selangor Darul Ehsan.

Client

Perbadanan Kemajuan Negeri Selangor

Contract Sum

RM 689,789

Involvement

• 3d Illustration • Digitized plan • Color plan • Board Arrangement

Software Application

• AutoCAD • Adobe photoshop • 3DSketchUp • 3DLumion

Landscape Architect

• Mr Muhammad Syafiq Khairudin


Ta s k s Site visit at Community Park SS7, kelana Jaya mr Mr Salehuddin and Mr Syafiq ti saw site condition. There have 2 area that one of it already designed and other one in unproper open space. Kompleks Kolam kelana jaya Glomac Masjid

Bussiness

kelana jaya

Centre

Developed area

Pond

Kompleks PKNS

Unproper open space

Existing Plan of Community Park SS7 kelana jaya.

Site Condition


After site visit on the same day, Mr Saleh give me a task to do superimposed perspective and designing astaka and illustrated it on 3d graphics for presentation the other day. On the limit time, the experience should be using for finished up the tasks given.

Perspective 1

Perspective 2

Perspective 3

Convert to seating area during construction


K U A L A L U M P U R I N T E R N AT I O N A L A I R P O R T 2 ( K L I A 2 ) ITEM

DESCRIPTION

Project Title

Development of a Generation Plant for Supply of Chilled Water and Electricity and Associated Works (PV02) at The New Low Cost Carrier Terminal (KLIA2) at KLIA , Sepang, Selangor.

Client

Malaysia Airports Holdings Berhad

Architect

Arkitek IPPM Sdn. Bhd.

Contractor

Shinryo (Malaysia) Sdn. Bhd

C&S Engineer

TG. Tan & Partners Sdn. Bhd

M&E Engineer

MEP Engineering Sdn. Bhd

Involvement

• Edit Layout Plan (Bamboo Area, Water Feature Area) • Design Water Feature • Detail Drawing of Water Feature

Software Application

• AutoCAD

Landscape Architect

Mdm Wan Faridah Wan Jaafar


KLIA 2 is another project from Malaysia Airports

Holding

Berhad.

The

work

given

to

Morphosis Design is not for the whole KLIA 2 but only for Airport Cooling Energy Supply. The whole designed by

Landscape Architect Mdm. Wan

Faridah Wan Jaafar. As for me I have been in charged for editing the amendment of layout plan.

Bamboo arranged randomly

and

compact

to

create barrier


A narrow space between the wall

will be designed

with the water fountain.

1

Before, the water fountain

2

should be design with Zen Garden

concept

changed

for

but lower

maintenance.

3

Amendment from Engineer

Engineer amend to replace grass with stone chipping for easier maintenance at area 1 Then, at area 2, they want us to propose shrubs or Bamboo tree as barrier. For area 3, at the narrow space between building wall, Engineer want us to propose water feature and Hard Landscape.


ZERO LOT SHOW HOUSE ITEM

DESCRIPTION

Project Title

Proposed Feature Wall Re-improvement at Zero Lot Show House Bandar Utama

Client

Bandar Utama Development

Architect

CT Architect Sdn. Bhd.

Involvement

• Redesign Feature Wall (3 Option) • Illustration drawing

Software Application

• AutoCAD • Adobe Photoshop

Landscape Architect

Mr Muhammad Syafiq Khairudin


Existing Feature Wall

Redesign by Landscape Architect Option 1

Zero Lot Show House has been built a long time ago to promote house development.

Modern Contemporary design

Pictures above shown the changes of the

Option 2

design before and after. The client wanted to change the existing feature wall to urban contemporary design. LA’s already redesigned it but the client wanted to use the extra paver for the design. Then, I came out with 3 options in order to reuse the paver material and select the same colour tone to match it.

Option 3


POLITEKNIK BANTING ITEM

DESCRIPTION

Project Title

Proposed Landscape Development at Politeknik Banting Selangor.

Client

Ministry of Higher Education

Developer

Department of Works

Contractor

Uni Integrated

Architect

NRY Architect Sdn. Bhd

Involvement

• Site Inspection • Site meeting

Landscape Architect

Mr Mohamad Nizar Firdaus Supian


Problems occurred such as misunderstood, blaming each others between consultant and contractor, because

of

damages

happened

on

site.

Comments given from the Landscape Contractor are based on below :-

When I started my practical training at Morphosis Design, Politeknik Banting was on the final stage of

Damage Boulders

Damage Walkway

Died tree and 2meter clear trunk for Majlis Approval

Tree do not have staking

construction. In the meantime, site meeting and works done by contractors

need to be monitor

every week in order to make sure the design is based

on

the

development

specification. phase

of

Along

Politeknik

Development, many problems occur.

with

the

Banting


The major problem at Politeknik Banting is the hard landscape which is the picnic table. The picnic table provided by contractor was not similar with drawing specification which unstable and unsafe for user. It would cause injury which to user and action

will

be

taken

to

consultant

as

the

consequences.

Contractor try to save cost with construct the picnic table themselves with cheaper material that not same with Drawing Detail

Action

taken

overcome

the

was

by

to

problem

replacing

the

picnic table with better materials to make sure picnic table provided is safe for user.


LE HERITAGE, SG. PENCHAL A , KUAL A LUMPUR ITEM

DESCRIPTION

Project Title

Proposed Landscape at 20 unit Terrace House and Electrical Substation, Sg. Penchala Road, Wilayah Persekutuan Kuala Lumpur

Client

Warisan Hijrah (M) Sdn. Bhd

Architect

AJSR Sdn. Bhd

Involvement

• Perspective

Software Application

• SketchUp • Adobe Photoshop

Practical Student

Ms Zurina Azizan


This project was given to practical student, Ms Zurina Azizan in order to complete the Submission Plan for residential at Sg. Penchala. Meanwhile I have been incharged for making the design perspective. The design changes for couple times.

Perspective Area 2 (Option 1)

Eventually

there

was

Master Plan amendment, which Perspective Area 1B (Option 2)

Architect

required the planting in order

to

conditions Council.

Perspective Area 1A (Option 2)

only

fulfill

the

from

City

Somehow the

Master Plan is not valid anymore.

Perspective Area 1 (Option 1)

Master Plan done by Ms Zurina Azizan


K U M P U L A N P E N D I D I K A N YAYA S A N P E L A J A R A N J O H O R ITEM

DESCRIPTION

Project Title

Proposed Landscape Development at Kampus induk KPYPJ, Mukim Hulu Sungai Johor, Daerah Kota Tinggi, Johor Darul Takzim.

Client

YPJ Holding Sdn. Bhd

Architect

Farik Ghaffar Architect

Contract Sum

RM3.5Million

Involvement

• Idea development of signage • Detail Drawing of Signage • Working Drawing of Amphitheater Stage

Software Application

• Manual Sketch • AutoCad

Landscape Architect

Mr Mohd Amin Hadarih


Projek Kumpulan Pendidikan Kementerian Pelajaran Johor (KPYPJ) purpose is to built the main campus of Kumpulan Pendidikan Johor at Kota Tinggi Johor. For this project, I have been trust to design two signage which for the main entrance and for every junction or cross road. I have came out with three different options for the Landscape Architect to choose.

Option 1 and Option 2 have been chosen by the Landscape Architect to applied on the site. In order to complete the task smoothly which the time was limited, I was willing to helped the Landscape Architect to do the Detail Drawing . Other than that I have completed the Amphitheater Detail Drawing and done the green spaces of size probability for the whole Master Plan.


Detail Drawing of Signage at The Main Entrance

Detail drawing of Amphitheater

This project stressed on logical which for me in both design and construction work. The project is still on document tender phase and will be starting the construction shortly.

Detail Drawing of Signage at Junction


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.