BANDAR MERSING (OVERALL) ITEM
DESCRIPTION
Project Title
Proposed Master Plan Mersing Urban Renewal and Waterfront Development
Client
Majlis Daerah Mersing
Developer
Radiant Starfish Development Sdn. Bhd
C&S Engineer
Sepakat Teguh Engineering
M&E Engineer
Ryad Hassan Associate
Contract Sum
RM20,000,000
Involvement
• Idea and Inspiration for Iconic Sculpture • 3D illustration for Iconic Sculpture • Superimpose to Actual Site
Software Application
• Manual Sketches • 3D SketchUp • 3D Lumion • Adobe Photoshop
Landscape Architect
• Mr Mohd Fadrillah bin Mohd taib • Mr Haji Abdul Hakim bin Kussim • Mr Al Naim bin Jaafar
Introduction A revitalization of Mersing town through an inspired modern redevelopment incorporating iconic waterfront facilities, theme hotel, residential, and commercial zones, land and sea logistical amenities within landscaped tropical parks and walkways.
Concept 1. To inspire a New Mersing Identity by integrating the exiting urban fabric with lush green vistas and expansive waterscapes 2. To allow nature to flow around the site in multiple
Objectives 1. The Master Plan proposes a comprehensive and eco-friendly mix of quality modern residential, iconic civic & commercial zones, recreational parks and facilities. 2. To provide a sustainable & mixed development model complementing the exiting town & it’s environs
themes 3. Iconic statements have been delicately situated to create a subtle yet long lasting impression for all patrons to the site
Theme
Ta s k s In the process of completing the master plan for Bandar Mersing , I have been given a task to designed the 7 iconic sculpture for the whole Bandar Mersing.
Reference Images for Iconic Sculpture
The first step was searching for reference images. The iconic sculpture must be excusive and represent the identity of Bandar Mersing. Marine life concept was chosen in order to symbolized the waterfront. After generating ideas from reference Overall Master Plan by Landscape Architect LEGEND Iconic Sculpture
images few iconic were designed.
Design Process 1 (Iconic Sculpture)
Idea 3
Idea 2
Idea 1
Design Process 1 : Idea for earlier stage with the combination reference
of
images
needed more research in order to came out with creative design of the according Idea 4
waterfront to
the
Landscape Architect.
Idea 5
Design Process 2 (Iconic Sculpture)
Design Process 2 : According to the Landscape Architect the 2nd Design process were lack of abstract , too solid and stiff.
Idea 2
Idea 1 Idea 3
Idea 5 Idea 4
Idea 7
Idea 6
Design Process 3a (Iconic Sculpture)
Material option 1
Finally the 3rd Design Process of Iconic
Sculpture
accepted Architect
by
the
and
ideas
were
Landscape Morphosis
authority. Inspired by the weeds of marine life, the iconic sculpture can be abstract for a amazing Reference Images
sculpture.
Material option 2
Design Process 3a (Iconic Sculpture)
Day view of the Iconic sculpture
Sculpture design presentation with the developer
Alhamdulillah, the feedback was good which Mr Yusof as representative of the developer from Radiant Starfish
Development
satisfied
with
the
design
presented by Morphosis Design . With the successful of design process 3a for iconic sculpture the developer entrusted Morphosis Design with the continuation of the Bandar Mersing sculpture design. Night view of the iconic sculpture
Design Process 3b (Iconic Sculpture)
Iconic Sculpture inspired by dolphin
Material option 1
Reference Images
Material option 2
The Iconic Sculpture of design process 3b was accepted by the Landscape Architect and the Design Manager. The sculpture was inspired by a dolphin which in horizontal shape as the sculpture will be located near the road
Design Process 3b (Iconic Sculpture)
Day view of the sculpture
Night view of the sculpture
Design Process 3c (Iconic Sculpture) Inspired by weeds the Iconic Sculpture icon be construct with few Clock
options. Tower
Functional the
and
as
a
Road
Direction the sculpture will be located in between the buildings.
Reference Images
Material option 1
Material option 2
Design Process 3c (Iconic Sculpture)
Day view of the sculpture
Night view of the sculpture
Design Process 4a (Entrance Signage)
Sketch idea for Signage Sketch Idea for Bench
Design Process 4b (Entrance Signage)
Reference images
Perspective view of Entrance Signage
At first the design was accepted but it changed to a new design.
Sketch Idea for Entrance Signage
3D llustration for Entrance Signage
Superimpose with actual Location
Design Process 4c (Entrance Signage)
The Day View
3D Illustration
Entrance Signage Design by : Mr hakim Illustrated by : ZaediAsri Sketch idea by Mr Hakim The Night View
Design Process 5 (Archway)
3D llustration for Archway (SketchUp)
3D llustration for Archway (Lumion)
The day view
The night view
The concept basically from coral which the materials are the combination of concrete and light metal for exclusivity look.
Design Process 6a (Others)
Sketch idea for Bollard
Sketch idea for Lighting pole
Design Process 6b (Others)
Bollard Designed by : Mr Hakim Illustrated by : ZaediAsri
Rubbish Bin Designed by : Mr Hakim Illustrated by : ZaediAsri
Bench Designed by : Mr Hakim Illustrated by : ZaediAsri
Information Signage Designed by : Mr Hakim Illustrated by : ZaediAsri
BANDAR MERSING (PHASE 1) ITEM
DESCRIPTION
Project Title
Proposed Landscape Master Plan for Mersing Urban Renewal, Johor Darul Takzim (Phase 1) for Messrs. Radiant Starfish Development Berhad
Client
Majlis Daerah Mersing
Developer
Radiant Starfish Development Sdn. Bhd
C&S Engineer
Sepakat Teguh Engineering
M&E Engineer
Ryad Hassan Associate
Contract Sum
RM8,000,000
Involvement
• Digitize Pocket Park 1, Pocket Park 2, Pocket Park 3 • 3D illustration for overall Mersing Town (Phase 1) • Working Drawing (Layout Plan with Section Elevation, Dimension Plan, Overlay Underground Utility plan)
Software Application
• AutoCAD • 3D SketchUp • 3D Lumion
Landscape Architect
• Mr Mohd Fadrillah bin Mohd taib • Mr Haji Abdul Hakim bin Kussim • Mr Al Naim bin Jaafar
Ta s k s The developer ordered to stress on the phase 1
Each of the Pocket Park had sketch by Mr. Haji Mohd
compared to others. Again, Morphosis worked hard
Hakim. Task given for me was digitizing all the plans
to complete the phase 1 design in limited time given.
by using AutoCAD software.
There are 5 areas in phase 1.
Pocket park 1 (Area 2)
AREA 2 (Pocket Park 1)
AREA 3 (Pocket Park 2)
AREA 1 (Iconic Sculpture 1)
Design by : Mr hakim Illustrated by : ZaediAsri AREA 4 (Iconic Sculpture 2)
AREA 5 (Pocket Park 3)
Pocket park 3 (Area 5) Design by : Mr hakim Illustrated by : ZaediAsri
Pocket park 2 (Area 3) Design by : Mr hakim Illustrated by : ZaediAsri
Pocket Park 1
Park
1
illustrated
by
me
for
presentation to Majlis Daerah Mersing. This park become a transit area between road.
Ariel view Pocket Park 1
Perspective 2
Perspective 1
Perspective 3
Pocket Park 2
Pocket Park 2 are open space beside the shop lots. Designed a seating area with tensile.
Plan view of Pocket Park 2
Perspective 1
Ariel view
Perspective 2
Pocket Park 3
Pocket Park 3 have two different area. First area at the left side that designed a pocket park with tensile and seating area. The other side
is
linear
park
that
allocated
of
Decorative Water Fountain . Have 6 fountain there that represent island at mersing area. Then, also have green wall that designed with high technology, but, overall images created for presentation. The new design change according to Survey Plan and Plan view of Pocket park 3
Perspective 1
Underground Utility Plan.
Perspective 2
View Towards Decorative Fountain
View towards Green Wall
After digitizing process for the plans the combination process for each plan were by the surveyor. There were minimum adjustment at plan to be fixed on survey plan. Plan of Iconic Sculpture 1 and Iconic Sculpture 2 also combined together with the Survey plan.
Working Drawing : Overall Layout Plan
The overlay process with Underground Utility Plan been done to ensure the constructions work would not destroy the existing underground piping. If there was overlapping the design need to be adjust in order to prevent from any problem.
Overlay of Area 2 : Do not have problem
Overlay of Area 1 : Do not have problem
Overlay of Area 3 : Do not have problem
If overlay happen between underground utility plan with design plan, adjustment should be needed before proceed to working drawing. After done for adjystment, layout plan should be prepared together with supporting drawing such as perspective or section elevation. Arrange board properly that reader will understand the details when construction Layout Plan Area 3 and Area 4 with Supporting detail
Overlay of Area 5 : Do not have problem
happen later.
Layout Plan Area 1 and Area 2 with supporting detail
After finishing the layout plan with supporting detail and labeling, the important part to be done was dimensioning. In order to carry out the task easily the dimension needed as a marking process for each elements in to target the base for the design.
Layout Plan Area 3 and Area 4 with supporting detail
Layout Plan Area 5 with supporting detail
Dimension Plan Pocket park 1 (Area 2)
Dimension Plan Pocket Park 2 (Area 3)
Dimension Plan Pocket park 3 (Area 5b)
Working drawing was not that hard but there were amendments that need to made which caused the changes of the design. To prevent this thing to happen, serious discussion with client need to be done.
Dimension Plan Pocket park 3 (Area 5a)
T H E W I N N I N G T E A M O F B A N D A R M E R S I N G
Board Arrangement
Discussion of Materials
Detail up requirement
Discussion of no. board
Discussion of M&E and C&S
Detail Up Design
Adjusting the design
Discussion overlay design
Bandar Mersing is one of the biggest project of Morphosis so far. Many issues, problems, challenges that I need to faced when handling the project. This project had given me lots of experience and knowledge through my practical training. 3D Making
Working Drawing
This project also taught me the important of team work and cooperation from each of the team.
ZERO LOT CLUBHOUSE ITEM
DESCRIPTION
Project Title
Proposed Landscape for open space at club house (Zero Lot) at Lot 26623 to 27096, bandar Utama Damansara, Mukim Sungai Buloh, Daerah Petaling, Selangor Darul Ehsan
Client
Bandar Utama
Developer
Bandar Utama Development
Architect
CT Architect Sdn. Bhd
C&S Engineer
W.Lee Consulting Engineers
M&E Engineer
Leap Forth Engineers Sdn. Bhd
Quantity Surveyor
Bandar Utama Contract Department
Contract Sum
-
Involvement
• Detail Drawing • Idea for Fineshes Plan • Site Inspection
Software Application
• AutoCAD
Landscape Architect
• Mr. Mohd Zulhamin bin Zainal Abidin
Ta s k s When
I
started
with
my practical
training
at
Morphosis Design, Zero Lot was an urgent project which need to complete in limited time. All of the Construction Drawing need to be completed which I entrusted to do the detail drawing and contributing ideas in decorative wall design. For the time being Zero Lot for landscape is almost complete. Lts od design changes done to the decorative wall turned
Detail of Community Wall and ramp
into a seating area, the higher level of the decking material used and more.
Ramp in Construction Progress
Architecture Wall Pattern First idea of decorative wall
Second idea to be synchronize with architecture wall
The first idea to design the Decorative Wall at Community Area was a void wall with abstract heart decorative which means the love between the community but the design changed to architecture wall which has holes connected with ‘Yin-Yang’ design.
After
the
construction
started
client
demanded for a seating area. Convert to seating area during construction
Custom Green Curvilinear Seating Area & Playground Area
Playground designed by supplier refer to our site condition and specification
Pembinaan Green Curvilinear Seating mengikut spesification seperti didalam drawing tetapi grass crete dijadikan pavement tanpa pengetahuan consultant. As-Built drawing perlu dibuat. Grass Crete change to pavement
Green Curvilinear Seating towards playground area
Detail of decorative retaining Wall with Seating Area
Seating attach at retaining wall done for construction with same specification as drawing
Zero Lot Club House is the only project involved on the construction stage. All design already designed by the Landscape Architect. My task was on makin the detail drawing to be submitted to contractor to be construct. But, for the finishes plan, my task is to designed the pattern on the floor by using extra pavement on the site. My concept is ‘PIXEL’ which more to random patter n used.
Finishes Plan designed by ZaediAsri already implemented
The pavement almost same with the drawing and keep on the same concept
C O M M U N I T Y PA R K S S 7 , K E L A N A J AYA , S E L A N G O R ITEM
DESCRIPTION
Project Title
Redeveloped Landscape at Taman tasik Komuniti SS7 Kelana jaya, Selangor Darul Ehsan.
Client
Perbadanan Kemajuan Negeri Selangor
Contract Sum
RM 689,789
Involvement
• 3d Illustration • Digitized plan • Color plan • Board Arrangement
Software Application
• AutoCAD • Adobe photoshop • 3DSketchUp • 3DLumion
Landscape Architect
• Mr Muhammad Syafiq Khairudin
Ta s k s Site visit at Community Park SS7, kelana Jaya mr Mr Salehuddin and Mr Syafiq ti saw site condition. There have 2 area that one of it already designed and other one in unproper open space. Kompleks Kolam kelana jaya Glomac Masjid
Bussiness
kelana jaya
Centre
Developed area
Pond
Kompleks PKNS
Unproper open space
Existing Plan of Community Park SS7 kelana jaya.
Site Condition
After site visit on the same day, Mr Saleh give me a task to do superimposed perspective and designing astaka and illustrated it on 3d graphics for presentation the other day. On the limit time, the experience should be using for finished up the tasks given.
Perspective 1
Perspective 2
Perspective 3
Convert to seating area during construction
K U A L A L U M P U R I N T E R N AT I O N A L A I R P O R T 2 ( K L I A 2 ) ITEM
DESCRIPTION
Project Title
Development of a Generation Plant for Supply of Chilled Water and Electricity and Associated Works (PV02) at The New Low Cost Carrier Terminal (KLIA2) at KLIA , Sepang, Selangor.
Client
Malaysia Airports Holdings Berhad
Architect
Arkitek IPPM Sdn. Bhd.
Contractor
Shinryo (Malaysia) Sdn. Bhd
C&S Engineer
TG. Tan & Partners Sdn. Bhd
M&E Engineer
MEP Engineering Sdn. Bhd
Involvement
• Edit Layout Plan (Bamboo Area, Water Feature Area) • Design Water Feature • Detail Drawing of Water Feature
Software Application
• AutoCAD
Landscape Architect
Mdm Wan Faridah Wan Jaafar
KLIA 2 is another project from Malaysia Airports
Holding
Berhad.
The
work
given
to
Morphosis Design is not for the whole KLIA 2 but only for Airport Cooling Energy Supply. The whole designed by
Landscape Architect Mdm. Wan
Faridah Wan Jaafar. As for me I have been in charged for editing the amendment of layout plan.
Bamboo arranged randomly
and
compact
to
create barrier
A narrow space between the wall
will be designed
with the water fountain.
1
Before, the water fountain
2
should be design with Zen Garden
concept
changed
for
but lower
maintenance.
3
Amendment from Engineer
Engineer amend to replace grass with stone chipping for easier maintenance at area 1 Then, at area 2, they want us to propose shrubs or Bamboo tree as barrier. For area 3, at the narrow space between building wall, Engineer want us to propose water feature and Hard Landscape.
ZERO LOT SHOW HOUSE ITEM
DESCRIPTION
Project Title
Proposed Feature Wall Re-improvement at Zero Lot Show House Bandar Utama
Client
Bandar Utama Development
Architect
CT Architect Sdn. Bhd.
Involvement
• Redesign Feature Wall (3 Option) • Illustration drawing
Software Application
• AutoCAD • Adobe Photoshop
Landscape Architect
Mr Muhammad Syafiq Khairudin
Existing Feature Wall
Redesign by Landscape Architect Option 1
Zero Lot Show House has been built a long time ago to promote house development.
Modern Contemporary design
Pictures above shown the changes of the
Option 2
design before and after. The client wanted to change the existing feature wall to urban contemporary design. LA’s already redesigned it but the client wanted to use the extra paver for the design. Then, I came out with 3 options in order to reuse the paver material and select the same colour tone to match it.
Option 3
POLITEKNIK BANTING ITEM
DESCRIPTION
Project Title
Proposed Landscape Development at Politeknik Banting Selangor.
Client
Ministry of Higher Education
Developer
Department of Works
Contractor
Uni Integrated
Architect
NRY Architect Sdn. Bhd
Involvement
• Site Inspection • Site meeting
Landscape Architect
Mr Mohamad Nizar Firdaus Supian
Problems occurred such as misunderstood, blaming each others between consultant and contractor, because
of
damages
happened
on
site.
Comments given from the Landscape Contractor are based on below :-
When I started my practical training at Morphosis Design, Politeknik Banting was on the final stage of
Damage Boulders
Damage Walkway
Died tree and 2meter clear trunk for Majlis Approval
Tree do not have staking
construction. In the meantime, site meeting and works done by contractors
need to be monitor
every week in order to make sure the design is based
on
the
development
specification. phase
of
Along
Politeknik
Development, many problems occur.
with
the
Banting
The major problem at Politeknik Banting is the hard landscape which is the picnic table. The picnic table provided by contractor was not similar with drawing specification which unstable and unsafe for user. It would cause injury which to user and action
will
be
taken
to
consultant
as
the
consequences.
Contractor try to save cost with construct the picnic table themselves with cheaper material that not same with Drawing Detail
Action
taken
overcome
the
was
by
to
problem
replacing
the
picnic table with better materials to make sure picnic table provided is safe for user.
LE HERITAGE, SG. PENCHAL A , KUAL A LUMPUR ITEM
DESCRIPTION
Project Title
Proposed Landscape at 20 unit Terrace House and Electrical Substation, Sg. Penchala Road, Wilayah Persekutuan Kuala Lumpur
Client
Warisan Hijrah (M) Sdn. Bhd
Architect
AJSR Sdn. Bhd
Involvement
• Perspective
Software Application
• SketchUp • Adobe Photoshop
Practical Student
Ms Zurina Azizan
This project was given to practical student, Ms Zurina Azizan in order to complete the Submission Plan for residential at Sg. Penchala. Meanwhile I have been incharged for making the design perspective. The design changes for couple times.
Perspective Area 2 (Option 1)
Eventually
there
was
Master Plan amendment, which Perspective Area 1B (Option 2)
Architect
required the planting in order
to
conditions Council.
Perspective Area 1A (Option 2)
only
fulfill
the
from
City
Somehow the
Master Plan is not valid anymore.
Perspective Area 1 (Option 1)
Master Plan done by Ms Zurina Azizan
K U M P U L A N P E N D I D I K A N YAYA S A N P E L A J A R A N J O H O R ITEM
DESCRIPTION
Project Title
Proposed Landscape Development at Kampus induk KPYPJ, Mukim Hulu Sungai Johor, Daerah Kota Tinggi, Johor Darul Takzim.
Client
YPJ Holding Sdn. Bhd
Architect
Farik Ghaffar Architect
Contract Sum
RM3.5Million
Involvement
• Idea development of signage • Detail Drawing of Signage • Working Drawing of Amphitheater Stage
Software Application
• Manual Sketch • AutoCad
Landscape Architect
Mr Mohd Amin Hadarih
Projek Kumpulan Pendidikan Kementerian Pelajaran Johor (KPYPJ) purpose is to built the main campus of Kumpulan Pendidikan Johor at Kota Tinggi Johor. For this project, I have been trust to design two signage which for the main entrance and for every junction or cross road. I have came out with three different options for the Landscape Architect to choose.
Option 1 and Option 2 have been chosen by the Landscape Architect to applied on the site. In order to complete the task smoothly which the time was limited, I was willing to helped the Landscape Architect to do the Detail Drawing . Other than that I have completed the Amphitheater Detail Drawing and done the green spaces of size probability for the whole Master Plan.
Detail Drawing of Signage at The Main Entrance
Detail drawing of Amphitheater
This project stressed on logical which for me in both design and construction work. The project is still on document tender phase and will be starting the construction shortly.
Detail Drawing of Signage at Junction